sopan gadang asli penawaran

72
REKAPITULASI BIAYA KEGIATAN : REHAB SEDANG/ BERAT PUSKESMAS PEMBANTU PEKERJAAN : PEMBANGUNAN POSKESRI SOPAN GADANG LOKASI : MAEK KECAMATAN BUKIK BARISAN KABUPATEN LIMAPULUH KOTA T. ANGGARAN : 2010. NO URAIAN PEKERJAAN JUMLAH A. BANGUNAN PUSKESMAS PEMBANTU I PEKERJAAN PENDAHULUAN Rp. 3,297,710.00 II PEKERJAAN PONDASI Rp. 13,889,803.62 III PEKERJAAN BETON BERTULANG Rp. 18,579,521.68 IV PEKERJAAN DINDING Rp. 27,797,452.61 V PEKERJAAN ATAP Rp. 25,946,651.72 VI PEKERJAAN PLESTERAN Rp. 10,666,055.46 VII PEKERJAAN PLAFOND Rp. 14,699,321.79 VIII PEKERJAAN LANTAI Rp. 12,646,507.88 IX PEKERJAAN PINTU & JENDELA Rp. 14,453,045.35 X PEKERJAAN PENGECATAN Rp. 10,287,749.37 XI PEKERJAAN PERLENGKAPAN DALAM Rp. 9,578,556.88 XII PEKERJAAN PERLENGKAPAN LUAR Rp. 8,227,987.37 JUMLAH A Rp. 170,070,363.74 PPN A 10% Rp. 17,007,036.37 JUMLAH Rp. 187,077,400.11 DIBULATKAN Rp. 187,077,000.00 B. PEKERJAAN PAGAR KELILING BANGUNAN I PEKERJAAN PENDAHULUAN Rp. 570,240.00 II PEKERJAAN PONDASI Rp. 6,712,752.20 III PEKERJAAN BETON BERTULANG Rp. 14,612,595.14 IV PEKERJAAN DINDING Rp. 19,259,373.64 V PEKERJAAN PLESTERAN Rp. 5,153,915.27 VI PEKERJAAN PENGECATAN Rp. 2,092,860.69 JUMLAH B Rp. 48,401,736.95 PPN B 10% Rp. 4,840,173.69 JUMLAH Rp. 53,241,910.64 DIBULATKAN Rp. 53,241,000.00 JUMLAH A + B Rp. 218,472,100.69 PPN 10 % Rp. 21,847,210.07 JUMLAH Rp. 240,319,310.76 DIBULATKAN Rp. 240,319,000.00 Terbilang : DUA RATUS EMPAT PULUH JUTA TIGA RATUS SEMBILAN BELAS RIBU RUPIAH Payakumbuh, 4 Mei 2009 Penawar CV. FANNELIN HENDRI UTAMA Direktur

Upload: hendri-een

Post on 26-Jun-2015

245 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Sopan Gadang Asli Penawaran

REKAPITULASI BIAYAKEGIATAN : REHAB SEDANG/ BERAT PUSKESMAS PEMBANTU

PEKERJAAN : PEMBANGUNAN POSKESRI SOPAN GADANG

LOKASI : MAEK KECAMATAN BUKIK BARISAN KABUPATEN LIMAPULUH KOTA

T. ANGGARAN: 2010.

NO URAIAN PEKERJAAN JUMLAH

A. BANGUNAN PUSKESMAS PEMBANTU

I PEKERJAAN PENDAHULUAN Rp. 3,297,710.00

II PEKERJAAN PONDASI Rp. 13,889,803.62

III PEKERJAAN BETON BERTULANG Rp. 18,579,521.68

IV PEKERJAAN DINDING Rp. 27,797,452.61

V PEKERJAAN ATAP Rp. 25,946,651.72

VI PEKERJAAN PLESTERAN Rp. 10,666,055.46

VII PEKERJAAN PLAFOND Rp. 14,699,321.79

VIII PEKERJAAN LANTAI Rp. 12,646,507.88

IX PEKERJAAN PINTU & JENDELA Rp. 14,453,045.35

X PEKERJAAN PENGECATAN Rp. 10,287,749.37

XI PEKERJAAN PERLENGKAPAN DALAM Rp. 9,578,556.88

XII PEKERJAAN PERLENGKAPAN LUAR Rp. 8,227,987.37

JUMLAH A Rp. 170,070,363.74

PPN A 10% Rp. 17,007,036.37

JUMLAH Rp. 187,077,400.11

DIBULATKAN Rp. 187,077,000.00

B. PEKERJAAN PAGAR KELILING BANGUNAN

I PEKERJAAN PENDAHULUAN Rp. 570,240.00

II PEKERJAAN PONDASI Rp. 6,712,752.20

III PEKERJAAN BETON BERTULANG Rp. 14,612,595.14

IV PEKERJAAN DINDING Rp. 19,259,373.64

V PEKERJAAN PLESTERAN Rp. 5,153,915.27

VI PEKERJAAN PENGECATAN Rp. 2,092,860.69

JUMLAH B Rp. 48,401,736.95

PPN B 10% Rp. 4,840,173.69

JUMLAH Rp. 53,241,910.64

DIBULATKAN Rp. 53,241,000.00

JUMLAH A + B Rp. 218,472,100.69

PPN 10 % Rp. 21,847,210.07

JUMLAH Rp. 240,319,310.76

DIBULATKAN Rp. 240,319,000.00

Terbilang : DUA RATUS EMPAT PULUH JUTA TIGA RATUS SEMBILAN BELAS RIBU RUPIAH

Payakumbuh, 4 Mei 2009

Penawar

CV. FANNELIN

HENDRI UTAMA

Direktur

Page 2: Sopan Gadang Asli Penawaran

-

-

Pagu 274,491,000.00 100.00 % -

240,319,000.00 87.55 %

34,172,000.00 12.45 %

Page 3: Sopan Gadang Asli Penawaran

DAFTAR KUANTITAS & HARGA / RENCANA ANGGARAN BIAYA ( RAB )

KEGIATAN : REHAB SEDANG/ BERAT PUSKESMAS PEMBANTUPEKERJAAN : PEMBANGUNAN POSKESRI SOPAN GADANGLOKASI : MAEK KECAMATAN BUKIK BARISAN KABUPATEN LIMAPULUH KOTAT. ANGGARAN : 2010.

NO URAIAN PEKERJAAN SAT VOLUME

a b c d e f = d x e g

A. BANGUNAN PUSKESMAS PEMBANTU

I PEKERJAAN PENDAHULUAN

1 Pasangan Plank Papan Nama Proyek Ls 1.00 200,000.00 200,000.00

2 Pembersihan Lapangan Dan Perataan M2 135.00 6,050.00 816,750.00

3 Pasang Papan Bouwplank M' 48.00 47,520.00 2,280,960.00

3,297,710.00

II PEKERJAAN PONDASI

1 Galian Tanah Pondasi M3 58.80 17,160.00 1,009,008.00

2 Pasangan Aanstampang Batu Kali M3 11.76 188,496.00 2,216,712.96

3 Pasangan Pondasi Batu Kali M3 24.99 421,894.00 10,543,131.06

4 Urugan Kembali M3 14.70 8,228.00 120,951.60

13,889,803.62

III PEKERJAAN BETON BERTULANG

1 Pekerjaan Sloof Beton 15/20 M3 2.21 2,900,315.11 6,395,194.81

2 Pekerjaan Kolom Praktis 13/13 M3 1.46 3,726,616.01 5,432,008.67

3 Pekerjaan Balok 15/30 Teras M3 0.21 3,347,945.44 690,513.75

4 Pekerjaan Balok 13/13 Untuk Plat Beton Teras M3 0.03 3,726,616.01 125,959.62

5 Pekerjaan Ring Balok 13/15 M3 1.43 3,609,111.33 5,172,758.82

6 Pekerjaan Plat Beton, Tebal 7 Cm M3 0.09 4,580,348.23 416,811.69

7 Pek. Plat Beton, Tebal 7 Cm Untuk Meja Dapur M3 0.08 4,580,348.23 346,274.33

18,579,521.68

IV PEKERJAAN DINDING

1 Pasangan Dinding Bata 1:2 M2 18.36 87,825.10 1,612,468.84

2 Pasangan Dinding Bata 1:4 M2 193.49 80,151.50 15,508,273.28

3 Pasangan Batu Alam M2 9.45 222,588.30 2,104,349.79

4 Pekerjaan Rangka Kusen M3 1.45 4,545,200.00 6,581,904.12

5 Memenie Rangka Kusen Yang Menyentuh Pasangan M2 22.53 10,059.50 226,600.30

6 Pasangan Baut Angker Kusen Bh 64.00 2,000.00 128,000.00

7 Pasangan Keramik Dinding 20/25 UntukWC/KM M2 12.12 114,382.40 1,386,314.69

8 Pasangan Les Keramik Artistik 8/20 M' 11.20 22,280.50 249,541.60

27,797,452.61

V PEKERJAAN ATAP

1 Pas. Kuda-Kuda M3 2.43 4,407,700.00 10,719,879.02

2 Pas. Gording M3 1.58 4,035,680.00 6,356,196.00

3 Angker Kuda-Kuda + Baut Bh 102.00 2,500.00 255,000.00

4 Pek. Residu M2 128.30 5,461.50 700,732.30

5 Pasangan Lesplank Papan Double Dirotter M2 11.88 55,715.00 661,615.63

6 Pasangan Atap Seng Warna Gelombang BJLSK 20 M2 134.77 51,084.00 6,884,654.54

7 Pasangan Perabung Atap Seng Warna BJLSK 30 M2 12.63 29,194.00 368,574.25

25,946,651.72

VI PEKERJAAN PLESTERAN

1 Plesteran Dinding 1:2 Ditaring Licin M2 36.72 26,768.50 982,939.32

2 Plesteran Dinding 1:4 Ditaring Licin M2 409.02 23,425.60 9,581,632.61

3 Afwerking Beton M2 3.25 31,225.70 101,483.53

10,666,055.46

VII PEKERJAAN PLAFOND

1 Pasangan Rangka Plafon M2 115.05 77,715.00 8,940,916.46

2 Pasangan Plafon Triplek M2 69.05 29,469.00 2,034,760.78

3 Pasangan Plafon Lumbresering M2 46.00 67,441.00 3,102,286.00

4 Pasangan Les Profil 4,5 x 4,5 x 400 M' 144.10 4,312.00 621,358.55

14,699,321.79

VIII PEKERJAAN LANTAI

1 Pekerjaan Urugan Tanah M3 7.14 56,925.00 406,216.80

2 Pekerjaan Urugan Pasir M3 7.14 51,590.00 368,146.24

3 Pekerjaan Cor Beton Tumbuk 1:3:5 Tebal 7 Cm M3 5.30 419,969.00 2,226,444.66

4 Pas. Keramik Lantai 30 x 30 M2 65.40 115,778.30 7,572,190.27

5 Pas. Keramik Lantai 30 x 30 Anti Slip M2 10.73 119,078.30 1,277,918.55

6 Pas. Keramik Lantai 20 x 20 Anti Slip untuk KM/WC M2 3.65 113,578.30 413,992.90

7 Pasangan Keramik 20/20 Untuk Meja Dapur M2 0.90 113,578.30 102,220.47

8 Pasangan Bon - Bon M' 17.00 16,434.00 279,378.00

12,646,507.88

HARGA SATUAN (Rp)

SUB TOTAL (Rp)

T O T A L (Rp)

Page 4: Sopan Gadang Asli Penawaran

NO URAIAN PEKERJAAN SAT VOLUME

a b c d e f = d x e g

HARGA SATUAN (Rp)

SUB TOTAL (Rp)

T O T A L (Rp)

IX PEKERJAAN PINTU & JENDELA

A Pekerjaan Pintu Dan Jendela

1 Pekerjaan Pintu Panil M2 15.29 289,025.00 4,418,614.20

2 Pekerjaan Jendela Rangka Kaca Warna Tebal 3 mm M2 15.60 236,060.00 3,682,347.15

3 Pasangan Jalusi Ventilasi M2 3.36 264,825.00 889,812.00

4 Pasangan Pintu Fiber komplit Unit 2.00 230,000.00 460,000.00

B Penggantung / Pengunci

1 Pas. Kunci Pintu 2 Slaagh Bh 9.00 190,228.50 1,712,056.50

2 Pas. Engsel Pintu Bh 27.00 22,060.50 595,633.50

3 Pas. Gerendel Pintu Bh 8.00 25,014.00 200,112.00

4 Pas. Engsel Jendela Bh 40.00 16,907.00 676,280.00

5 Pas. Gerendel Jendela Bh 40.00 20,614.00 824,560.00

6 Pas Hak Angin Jendela Bh 40.00 16,560.50 662,420.00

7 Pas. Hand Vatten Jendela Bh 20.00 16,560.50 331,210.00

14,453,045.35

X PEKERJAAN PENGECATAN

1 Mencat Dinding + Plat Dengan Cat Air 3 x Jalan M2 445.74 9,999.00 4,456,994.26

2 Mencat Plafon Triplek Dengan Cat Air 3 x Jalan M2 69.05 9,999.00 690,405.95

3 Mencat Kayu Yang Kelihatan Dengan Cat Minyak M2 142.66 19,085.00 2,722,677.55

4 Mencat Plafond Lambersiring Dengan Cat Impra M2 46.00 46,700.50 2,148,223.00

5 Mencat Batu Alam Dengan Cat Bitasol/ Wimolex M2 10.50 25,652.00 269,448.61

10,287,749.37

XI PEKERJAAN PERLENGKAPAN DALAM

A LISTRIK

1 Tambah Daya 1300 Watt Unit 1.00 2,000,000.00 2,000,000.00

2 Pasangan Instalasi Listrik Titik 20.00 120,000.00 2,400,000.00

3 Pasangan Lampu Phillips 18 Watt Enery Saver Unit 11.00 35,000.00 385,000.00

5 Pasangan Saklar Double Bh 2.00 9,500.00 19,000.00

6 Pasangan Saklar Tunggal Bh 7.00 10,000.00 70,000.00

7 Pasangan Stop Kontak Bh 9.00 12,000.00 108,000.00

8 Pasangan Panel Box MCB 2 Phase Unit 1.00 200,000.00 200,000.00

5,182,000.00

B KM/WC/DAPUR

1 Pasangan Kloset Jongkok Unit 2.00 317,823.00 635,646.00

2 Pasangan Bak Fiber 60x60x69 Unit 2.00 484,990.00 969,980.00

3 Pasangan Kran Air 3/4" Bh 2.00 25,954.50 51,909.00

4 Pasangan Floor Drain Bh 2.00 25,905.00 51,810.00

5 Pasangan Bak Cuci Piring Stainless + Kran ( Komplit ) Unit 1.00 248,721.00 248,721.00

1,958,066.00

C SANITASI

1 Pasangan Pipa GIP Dia 3/4" M' 17.80 32,219.55 573,507.99

2 Pasangan Pipa PVC 3" M' 17.25 47,394.46 817,554.48

3 Pasangan Pipa PVC 4" M' 16.35 64,062.90 1,047,428.42

2,438,490.88 9,578,556.88

XII PEKERJAAN PERLENGKAPAN LUAR

A Pekerjaan Piring-Piring

1. Galian Tanah M3 1.38 17,160.00 23,680.80

2. Pasangan Batu Bata M2 18.40 80,151.50 1,474,787.60

3. Timbunan Pasir Bawah Lantai M3 3.42 51,590.00 176,203.07

4. Cor Lantai 1:3:5 Ditaring Licin M3 3.42 419,969.00 1,434,383.12

5. Plesteran Bata M2 9.20 23,425.60 215,515.52

3,324,570.11

B Septictank

1 Septictank + Resapan

a. Galian Tanah Biasa M3 10.39 17,160.00 178,300.98

b. Urugan Kembali 1/4 Galian M3 2.60 8,228.00 21,373.26

c. Pasangan Batu Bata 1 Bata 1 : 2 M2 10.00 182,358.00 1,823,580.00

d. Pasangan Batu Bata 1/2 Bata 1 : 2 M2 2.28 87,825.10 200,241.23

e. Stamp Beton 1 : 3 : 5 M3 0.35 419,969.00 146,989.15

f. Plesteran 1 : 2 M2 8.02 26,768.50 214,683.37

g. Plat Beton Bertulang 1 : 2 : 3 M3 0.35 4,580,348.23 1,603,121.88

h. Krekel M3 0.84 70,000.00 58,800.00

i. Pasir Urug M3 0.84 30,000.00 25,200.00

j. Pipa Hawa GIP dia. 2 " M' 2.00 27,000.00 54,000.00

k. Memasang Pipa PVC Dia. 4 " M' 6.00 64,062.90 384,377.40

l. Batu Kali M3 0.45 95,000.00 42,750.00

m. Ijuk Kg 10.00 15,000.00 150,000.00

4,903,417.27 8,227,987.37

Page 5: Sopan Gadang Asli Penawaran

NO URAIAN PEKERJAAN SAT VOLUME

a b c d e f = d x e g

HARGA SATUAN (Rp)

SUB TOTAL (Rp)

T O T A L (Rp)

B. PEKERJAAN PAGAR KELILING BANGUNAN

I PEKERJAAN PENDAHULUAN

1 Pasang Papan Bouwplank M' 12.00 47,520.00 570,240.00

570,240.00

II PEKERJAAN PONDASI

1 Galian Tanah Pondasi M3 36.40 17,160.00 624,624.00

2 Pasangan Aanstampang Batu Kali M3 8.40 188,496.00 1,583,366.40

3 Pasangan Pondasi Batu Kali M3 10.50 421,894.00 4,429,887.00

4 Urugan Kembali M3 9.10 8,228.00 74,874.80

6,712,752.20

III PEKERJAAN BETON BERTULANG

1 Pekerjaan Sloof Beton 15/20 M3 2.10 2,900,315.11 6,090,661.72

2 Pekerjaan Kolom Beton 20/30 M3 0.36 2,371,367.17 853,692.18

3 Pekerjaan Kolom 20/20 M3 1.44 2,698,223.21 3,885,441.42

4 Pekerjaan Ring Balok 13/15 M3 1.05 3,609,111.33 3,782,799.82

14,612,595.14

IV PEKERJAAN DINDING

1 Pasangan Dinding Bata 1:4 M2 64.51 80,151.50 5,170,773.64

2 Pasangan Pagar Besi Hollow 2x4 cm Dan 2x2 Cm + C M2 6.48 320,000.00 2,073,600.00

3 Pasangan Pagar Besi Siku L 30.30.3 + Cat M2 25.13 160,000.00 4,020,000.00

4 Pasangan Pintu Gerbang ( Komplit ) + Cat M2 4.30 450,000.00 1,935,000.00

5 Pasangan Logo Dan Merek Aluminium Ls 1.00 6,060,000.00 6,060,000.00

19,259,373.64

V PEKERJAAN PLESTERAN

1 Plesteran Dinding 1:4 Ditaring Licin M2 177.16 23,425.60 4,150,009.02

2 Pekerjaan Afwerking Beton M2 32.15 31,225.70 1,003,906.26

5,153,915.27

VI PEKERJAAN PENGECATAN

1 Mencat Dinding Pagar Dengan Cat Air 3 x Jalan M2 209.31 9,999.00 2,092,860.69

2,092,860.69

JUMLAH 218,472,100.69 PPN 10% 21,847,210.07 JUMLAH 240,319,310.76

DIBULATKAN 240,319,000.00

Payakumbuh, 4 Mei 2009Penawar

CV. FANNELIN

HENDRI UTAMADirektur

Page 6: Sopan Gadang Asli Penawaran

218,472,100.69 100 0.09

218,472,100.69 100 0.37

218,472,100.69 100 1.04

218,472,100.69 100 0.46

218,472,100.69 100 1.01

218,472,100.69 100 4.83

218,472,100.69 100 0.06

218,472,100.69 100 2.93

218,472,100.69 100 2.49

218,472,100.69 100 0.32

218,472,100.69 100 0.06

218,472,100.69 100 2.37

218,472,100.69 100 0.19

218,472,100.69 100 0.16

218,472,100.69 100 0.74

218,472,100.69 100 7.10

218,472,100.69 100 0.96

218,472,100.69 100 3.01

218,472,100.69 100 0.10

218,472,100.69 100 0.06

218,472,100.69 100 0.63

218,472,100.69 100 0.11

218,472,100.69 100 4.91

218,472,100.69 100 2.91

218,472,100.69 100 0.12

218,472,100.69 100 0.32

218,472,100.69 100 0.30

218,472,100.69 100 3.15

218,472,100.69 100 0.17

218,472,100.69 100 0.45

218,472,100.69 100 4.39

218,472,100.69 100 0.05

218,472,100.69 100 4.09

218,472,100.69 100 0.93

218,472,100.69 100 1.42

218,472,100.69 100 0.28

218,472,100.69 100 0.19

218,472,100.69 100 0.17

218,472,100.69 100 1.02

218,472,100.69 100 3.47

218,472,100.69 100 0.58

218,472,100.69 100 0.19

218,472,100.69 100 0.05

218,472,100.69 100 0.13

Page 7: Sopan Gadang Asli Penawaran

218,472,100.69 100 2.02

218,472,100.69 100 1.69

218,472,100.69 100 0.41

218,472,100.69 100 0.21

218,472,100.69 100 0.78

218,472,100.69 100 0.27

218,472,100.69 100 0.09

218,472,100.69 100 0.31

218,472,100.69 100 0.38

218,472,100.69 100 0.30

218,472,100.69 100 0.15

218,472,100.69 100 2.04

218,472,100.69 100 0.32

218,472,100.69 100 1.25

218,472,100.69 100 0.98

218,472,100.69 100 0.12

218,472,100.69 100 0.92

218,472,100.69 100 1.10

218,472,100.69 100 0.18

218,472,100.69 100 0.01

218,472,100.69 100 0.03

218,472,100.69 100 0.05

218,472,100.69 100 0.09

218,472,100.69 100 0.29

218,472,100.69 100 0.44

218,472,100.69 100 0.02

218,472,100.69 100 0.02

218,472,100.69 100 0.11

218,472,100.69 100 0.26

218,472,100.69 100 0.37

218,472,100.69 100 0.48

218,472,100.69 100 0.01

218,472,100.69 100 0.68

218,472,100.69 100 0.08

218,472,100.69 100 0.66

218,472,100.69 100 0.10

218,472,100.69 100 0.08

218,472,100.69 100 0.01

218,472,100.69 100 0.83

218,472,100.69 100 0.09

218,472,100.69 100 0.07

218,472,100.69 100 0.10

218,472,100.69 100 0.73

218,472,100.69 100 0.03

218,472,100.69 100 0.01

218,472,100.69 100 0.02

218,472,100.69 100 0.18

218,472,100.69 100 0.02

218,472,100.69 100 0.07

Page 8: Sopan Gadang Asli Penawaran

218,472,100.69 100 0.26

218,472,100.69 100 0.29

218,472,100.69 100 0.72

218,472,100.69 100 2.03

218,472,100.69 100 0.03

218,472,100.69 100 2.79

218,472,100.69 100 0.39

218,472,100.69 100 1.78

218,472,100.69 100 1.73

218,472,100.69 100 2.37

218,472,100.69 100 0.95

218,472,100.69 100 1.84

218,472,100.69 100 0.89

218,472,100.69 100 2.77

218,472,100.69 100 1.90

218,472,100.69 100 0.46

218,472,100.69 100 0.96

Page 9: Sopan Gadang Asli Penawaran

Page 9

DAFTAR SATUAN ANALISA PEKERJAAN

KEGIATAN : REHAB SEDANG/ BERAT PUSKESMAS PEMBANTU

PEKERJAAN : PEMBANGUNAN POSKESRI SOPAN GADANG

LOKASI : MAEK KECAMATAN BUKIK BARISAN KABUPATEN LIMAPULUH KOTA

T. ANGGARAN : 2010.

NO. URAIAN HARGA SATUAN JUMLAH

1 2 3 4 5 6

1 1 M2 Membersihkan Lapangan dan Perataan

0.1000 Oh Pekerja Rp 35,000.00 Rp 3,500.00

0.0500 Oh Mandor Rp 40,000.00 Rp 2,000.00

Rp 5,500.00 Rp 5,500.00

Keuntungan dan Over head 10% Rp 550.00

Jumlah Rp 6,050.00

2 1 M' Pengukuran dan pemasangan bowplank

0.0120 M3 Kayu 5/7 Klas III Rp 1,800,000.00 Rp 21,600.00

0.0200 Kg Paku 2" - 5 " Rp 15,000.00 Rp 300.00

0.0070 M3 Kayu papan Klas III Rp 1,800,000.00 Rp 12,600.00

0.1000 Oh Tukang kayu Rp 45,000.00 Rp 4,500.00

0.1000 Oh Pekerja Rp 35,000.00 Rp 3,500.00

0.0100 Oh Kepala tukang Rp 50,000.00 Rp 500.00

0.0050 Oh Mandor Rp 40,000.00 Rp 200.00

Rp 8,700.00 Rp 34,500.00 Rp 43,200.00

Keuntungan dan Over head 10% Rp 4,320.00

Jumlah Rp 47,520.00

3 1 M3 Galian Tanah Biasa Sedalam 1 M'

0.4000 Oh Pekerja Rp 35,000.00 Rp 14,000.00

0.0400 Oh Mandor Rp 40,000.00 Rp 1,600.00

Rp 15,600.00 Rp 15,600.00

Keuntungan dan Over head 10% Rp 1,560.00

Jumlah Rp 17,160.00

4 1 M3 Urugan kembali

0.1920 Oh Pekerja Rp 35,000.00 Rp 6,720.00

0.0190 Oh Mandor Rp 40,000.00 Rp 760.00

Rp 7,480.00 Rp 7,480.00

Keuntungan dan Over head 10% Rp 748.00

Jumlah Rp 8,228.00

5 1 M3 Urugan pasir

1.2000 M3 Pasir urug Rp 30,000.00 Rp 36,000.00

0.3000 Oh Pekerja Rp 35,000.00 Rp 10,500.00

0.0100 Oh Mandor Rp 40,000.00 Rp 400.00

Rp 10,900.00 Rp 36,000.00 Rp 46,900.00

Keuntungan dan Over head 10% Rp 4,690.00

Jumlah Rp 51,590.00

6 1 M3 Urugan tanah

1.2000 M3 Tanah Timbunan Rp 35,000.00 Rp 42,000.00

0.2500 Oh Pekerja Rp 35,000.00 Rp 8,750.00

0.0250 Oh Mandor Rp 40,000.00 Rp 1,000.00

Rp 9,750.00 Rp 42,000.00 Rp 51,750.00

Keuntungan dan Over head 10% Rp 5,175.00

Jumlah Rp 56,925.00

7 1 M3 Pas. pondasi batu kosong (aanstampang)

1.2000 M3 Batu Kali Rp 95,000.00 Rp 114,000.00

0.3000 M3 Pasir urug Rp 30,000.00 Rp 9,000.00

0.7800 Oh Pekerja Rp 35,000.00 Rp 27,300.00

0.3900 Oh Tukang batu Rp 45,000.00 Rp 17,550.00

0.0390 Oh Kepala tukang Rp 50,000.00 Rp 1,950.00

0.0390 Oh Mandor Rp 40,000.00 Rp 1,560.00

Rp 48,360.00 Rp 123,000.00 Rp 171,360.00

Keuntungan dan Over head 10% Rp 17,136.00

Jumlah Rp 188,496.00

JUMLAH SATUAN UPAH

JUMLAH SATUAN BAHAN

Page 10: Sopan Gadang Asli Penawaran

Page 10

NO. URAIAN HARGA SATUAN JUMLAH

1 2 3 4 5 6

JUMLAH SATUAN UPAH

JUMLAH SATUAN BAHAN

8 1 M3 Pasang pondasi batu kali 1 Pc : 4 Ps

1.1000 M3 Batu Kali Rp 95,000.00 Rp 104,500.00

3.2600 Sak Semen portland (50 Kg) Rp 49,000.00 Rp 159,740.00

0.5200 M3 Pasir pasangan Rp 65,000.00 Rp 33,800.00

1.5000 Oh Pekerja Rp 35,000.00 Rp 52,500.00

0.6000 Oh Tukang batu Rp 45,000.00 Rp 27,000.00

0.0600 Oh Kepala tukang Rp 50,000.00 Rp 3,000.00

0.0750 Oh Mandor Rp 40,000.00 Rp 3,000.00

Rp 85,500.00 Rp 298,040.00 Rp 383,540.00

Keuntungan dan Over head 10% Rp 38,354.00

Jumlah Rp 421,894.00

9 1 M3 Membuat beton tumbuk 1 Pc : 3 Ps : 5 Kr

4.3600 Zak Semen portland (50 Kg) Rp 49,000.00 Rp 213,640.00

0.5200 M3 Pasir beton Rp 65,000.00 Rp 33,800.00

0.8700 M3 Koral beton Rp 70,000.00 Rp 60,900.00

1.6500 Oh Pekerja Rp 35,000.00 Rp 57,750.00

0.2500 Oh Tukang batu Rp 45,000.00 Rp 11,250.00

0.0250 Oh Kepala tukang Rp 50,000.00 Rp 1,250.00

0.0800 Oh Mandor Rp 40,000.00 Rp 3,200.00

Rp 73,450.00 Rp 308,340.00 Rp 381,790.00

Keuntungan dan Over head 10% Rp 38,179.00

Jumlah Rp 419,969.00

10 1 M3 Membuat beton 1 Pc : 2 Ps : 3 Kr

6.7200 Zak Semen portland (50 Kg) Rp 49,000.00 Rp 329,280.00

0.5400 M3 Pasir beton Rp 65,000.00 Rp 35,100.00

0.8100 M3 Koral beton Rp 70,000.00 Rp 56,700.00

2.0000 Oh Pekerja Rp 35,000.00 Rp 70,000.00

0.3500 Oh Tukang batu Rp 45,000.00 Rp 15,750.00

0.0350 Oh Kepala tukang Rp 50,000.00 Rp 1,750.00

1.0000 Oh Mandor Rp 40,000.00 Rp 40,000.00

Rp 127,500.00 Rp 421,080.00 Rp 548,580.00

Keuntungan dan Over head 10% Rp 54,858.00

Jumlah Rp 603,438.00

11 1 Kg Pembesian dengan besi polos atau besi ulir

1.0500 Kg Besi beton (polos/ulir) Rp 9,500.00 Rp 9,975.00

0.0150 Kg Kawat beton Rp 13,000.00 Rp 195.00

0.0070 Oh Pekerja Rp 35,000.00 Rp 245.00

0.0070 Oh Tukang besi Rp 45,000.00 Rp 315.00

0.0007 Oh Kepala tukang Rp 50,000.00 Rp 35.00

0.0003 Oh Mandor Rp 40,000.00 Rp 12.00

Rp 607.00 Rp 10,170.00 Rp 10,777.00

Keuntungan dan Over head 10% Rp 1,077.70

Jumlah Rp 11,854.70

12 1 M3 Stuut Werk / Perancah

0.6000 M3 Kayu Balok Kls III Rp 1,800,000.00 Rp 1,080,000.00

0.5000 Kg Paku Biasa Rp 15,000.00 Rp 7,500.00

2.0000 Oh Pekerja Rp 35,000.00 Rp 70,000.00

2.5000 Oh Tukang kayu Rp 45,000.00 Rp 112,500.00

0.2500 Oh Kepala tukang Rp 50,000.00 Rp 12,500.00

0.1000 Oh Mandor Rp 40,000.00 Rp 4,000.00

Rp 199,000.00 Rp 1,087,500.00 Rp 1,286,500.00

Keuntungan dan Over head 10% Rp 128,650.00

Jumlah Rp 1,415,150.00

13 1 M2 Pasang Bekisting

0.0450 M3 Kayu Papan Kls III Rp 1,800,000.00 Rp 81,000.00

0.3000 Kg Paku biasa 2" - 5" Rp 15,000.00 Rp 4,500.00

0.1000 Lt Minyak bekisting Rp 2,000.00 Rp 200.00

0.3000 Oh Pekerja Rp 35,000.00 Rp 10,500.00

0.2600 Oh Tukang kayu Rp 45,000.00 Rp 11,700.00

0.0260 Oh Kepala tukang Rp 50,000.00 Rp 1,300.00

0.0050 Oh Mandor Rp 40,000.00 Rp 200.00

Rp 23,700.00 Rp 85,700.00 Rp 109,400.00

Keuntungan dan Over head 10% Rp 10,940.00

Jumlah Rp 120,340.00

Page 11: Sopan Gadang Asli Penawaran

Page 11

NO. URAIAN HARGA SATUAN JUMLAH

1 2 3 4 5 6

JUMLAH SATUAN UPAH

JUMLAH SATUAN BAHAN

14 1 M3 Pekerjaan Sloof Beton Bertulang 15/20

126.0741 Kg Besi Beton Rp 11,854.70 Rp 1,494,570.33

6.6670 M2 Bekisting Rp 120,340.00 Rp 802,306.78

1.0000 M3 Stamp Beton 1:2:3 Rp 603,438.00 Rp 603,438.00

Rp 2,900,315.11 Rp 2,900,315.11

15 1 M3 Pekerjaan Kolom Beton Bertulang 15/50

264.4267 Kg Besi Beton Rp 11,854.70 Rp 3,134,698.81

6.6670 M2 Bekisting Rp 120,340.00 Rp 802,306.78

1.0000 M3 Stamp Beton 1:2:3 Rp 603,438.00 Rp 603,438.00

Rp 4,540,443.59 Rp 4,540,443.59

16 1 M3 Pekerjaan Kolom Praktis Beton Bertulang 13/13

195.7765 Kg Besi Beton Rp 11,854.70 Rp 2,320,871.23

6.6670 M2 Bekisting Rp 120,340.00 Rp 802,306.78

1.0000 M3 Stamp Beton 1:2:3 Rp 603,438.00 Rp 603,438.00

Rp 3,726,616.01 Rp 3,726,616.01

17 1 M3 Pekerjaan Balok Beton Bertulang 15/30

121.9812 Kg Besi Beton Rp 11,854.70 Rp 1,446,050.94

0.2500 M3 Stut Werk Rp 1,415,150.00 Rp 353,787.50

7.8500 M2 Bekisting Rp 120,340.00 Rp 944,669.00

1.0000 M3 Stamp Beton 1:2:3 Rp 603,438.00 Rp 603,438.00

Rp 3,347,945.44 Rp 3,347,945.44

18 1 M3 Pekerjaan Ring Balok Beton Bertulang 13/15

185.8644 Kg Besi Beton Rp 11,854.70 Rp 2,203,366.55

6.6670 M2 Bekisting Rp 120,340.00 Rp 802,306.78

1.0000 M3 Stamp Beton 1:2:3 Rp 603,438.00 Rp 603,438.00

Rp 3,609,111.33 Rp 3,609,111.33

19 1 M3 Pekerjaan Kolom Beton Bertulang 20/30

81.4548 Kg Besi Beton Rp 11,854.70 Rp 965,622.39

6.6670 M2 Bekisting Rp 120,340.00 Rp 802,306.78

1.0000 M3 Stamp Beton 1:2:3 Rp 603,438.00 Rp 603,438.00

Rp 2,371,367.17 Rp 2,371,367.17

20 1 M3 Pekerjaan Kolom Beton Bertulang 20/20

109.0267 Kg Besi Beton Rp 11,854.70 Rp 1,292,478.43

6.6670 M2 Bekisting Rp 120,340.00 Rp 802,306.78

1.0000 M3 Stamp Beton 1:2:3 Rp 603,438.00 Rp 603,438.00

Rp 2,698,223.21 Rp 2,698,223.21

21 Pekerjaan Plat Beton / 1 M3

103.3330 Kg Besi Rp 11,854.70 Rp 1,224,981.72

9.3330 M2 Bekisting Rp 120,340.00 Rp 1,123,133.22

1.0000 M3 Stamp Beton 1:2:3 Rp 603,438.00 Rp 603,438.00

0.4000 M3 Kayu / Papan Klas IV Rp 1,500,000.00 Rp 600,000.00

8.0000 Lbr Triplek t = 6 mm Rp 65,000.00 Rp 520,000.00

4.0000 Kg Paku Rp 15,000.00 Rp 60,000.00

0.2000 Oh Pekerja Rp 35,000.00 Rp 7,000.00

0.5000 Oh Tukang Kayu Rp 45,000.00 Rp 22,500.00

0.0500 Oh Kepala Tukang Kayu Rp 50,000.00 Rp 2,500.00

0.0100 Oh Mandor Rp 40,000.00 Rp 400.00

Rp 32,400.00 Rp 4,131,552.94 Rp 4,163,952.94

Keuntungan dan Over head 10% Rp 416,395.29

Jumlah Rp 4,580,348.23

22 1 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps

140.0000 Bh Batu Bata Rp 600.00 Rp 84,000.00

0.8700 Sak Semen portland Rp 49,000.00 Rp 42,630.00

0.0800 M3 Pasir pasangan Rp 65,000.00 Rp 5,200.00

0.6500 Oh Batu Bata Rp 35,000.00 Rp 22,750.00

0.2000 Oh Semen portland Rp 45,000.00 Rp 9,000.00

0.0200 Oh Pasir pasangan Rp 50,000.00 Rp 1,000.00

0.0300 Oh Mandor Rp 40,000.00 Rp 1,200.00

Rp 33,950.00 Rp 131,830.00 Rp 165,780.00

Keuntungan dan Over head 10% Rp 16,578.00

Jumlah Rp 182,358.00

Page 12: Sopan Gadang Asli Penawaran

Page 12

NO. URAIAN HARGA SATUAN JUMLAH

1 2 3 4 5 6

JUMLAH SATUAN UPAH

JUMLAH SATUAN BAHAN

23 1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps

70.0000 Bh Bata merah 5 x 11 x 22 cm Rp 600.00 Rp 42,000.00

0.3790 Zak Semen portland (50 Kg) Rp 49,000.00 Rp 18,571.00

0.0380 M3 Pasir pasangan Rp 65,000.00 Rp 2,470.00

0.3200 Oh Pekerja Rp 35,000.00 Rp 11,200.00

0.1000 Oh Tukang batu Rp 45,000.00 Rp 4,500.00

0.0100 Oh Kepala tukang Rp 50,000.00 Rp 500.00

0.0150 Oh Mandor Rp 40,000.00 Rp 600.00

Rp 16,800.00 Rp 63,041.00 Rp 79,841.00

Keuntungan dan Over head 10% Rp 7,984.10

Jumlah Rp 87,825.10

24 1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps

70.0000 Bh Bata merah 5 x 11 x 22 cm Rp 600.00 Rp 42,000.00

0.2300 Zak Semen portland (50 Kg) Rp 49,000.00 Rp 11,270.00

0.0430 M3 Pasir pasangan Rp 65,000.00 Rp 2,795.00

0.3200 Oh Pekerja Rp 35,000.00 Rp 11,200.00

0.1000 Oh Tukang batu Rp 45,000.00 Rp 4,500.00

0.0100 Oh Kepala tukang Rp 50,000.00 Rp 500.00

0.0150 Oh Mandor Rp 40,000.00 Rp 600.00

Rp 16,800.00 Rp 56,065.00 Rp 72,865.00

Keuntungan dan Over head 10% Rp 7,286.50

Jumlah Rp 80,151.50

25 1 M2 Pasangan bata merah tebal 1/4 bata, 1 Pc : 4 Ps

35.0000 Bh Bata merah 5 x 11 x 22 cm Rp 600.00 Rp 21,000.00

0.0810 Zak Semen portland (50 Kg) Rp 49,000.00 Rp 3,969.00

0.0480 M3 Pasir pasangan Rp 65,000.00 Rp 3,120.00

0.3200 Oh Pekerja Rp 35,000.00 Rp 11,200.00

0.1000 Oh Tukang batu Rp 45,000.00 Rp 4,500.00

0.0100 Oh Kepala tukang Rp 50,000.00 Rp 500.00

0.0150 Oh Mandor Rp 40,000.00 Rp 600.00

Rp 16,800.00 Rp 28,089.00 Rp 44,889.00

Keuntungan dan Over head 10% Rp 4,488.90

Jumlah Rp 49,377.90

26 1 M3 Pasang Kosen Pintu dan Jendela

1.2000 M3 Kayu Balok Kelas I Rp 2,500,000.00 Rp 3,000,000.00

6.0000 Oh Pekerja Rp 35,000.00 Rp 210,000.00

18.0000 Oh Tukang kayu Rp 45,000.00 Rp 810,000.00

2.0000 Oh Kepala tukang Rp 50,000.00 Rp 100,000.00

0.3000 Oh Mandor Rp 40,000.00 Rp 12,000.00

Rp 1,132,000.00 Rp 3,000,000.00 Rp 4,132,000.00

Keuntungan dan Over head 10% Rp 413,200.00

Jumlah Rp 4,545,200.00

27 1 M2 Pasang Jalusi Kosen

0.0600 M3 Kayu/ Papan Klas II Rp 2,000,000.00 Rp 120,000.00

0.1500 Kg Paku biasa 1/2" - 1" Rp 15,000.00 Rp 2,250.00

0.5000 Oh Pekerja Rp 35,000.00 Rp 17,500.00

2.0000 Oh Tukang kayu Rp 45,000.00 Rp 90,000.00

0.2000 Oh Kepala tukang Rp 50,000.00 Rp 10,000.00

0.0250 Oh Mandor Rp 40,000.00 Rp 1,000.00

Rp 118,500.00 Rp 122,250.00 Rp 240,750.00

Keuntungan dan Over head 10% Rp 24,075.00

Jumlah Rp 264,825.00

28 1 M2 Plesteran 1 Pc : 1 Ps, tebal 15 mm (Afwerking)

0.2580 Zak Semen portland (50 Kg) Rp 49,000.00 Rp 12,642.00

0.0130 M3 Pasir pasangan Rp 65,000.00 Rp 845.00

0.2000 Oh Pekerja Rp 35,000.00 Rp 7,000.00

0.1500 Oh Tukang batu Rp 45,000.00 Rp 6,750.00

0.0150 Oh Kepala tukang Rp 50,000.00 Rp 750.00

0.0100 Oh Mandor Rp 40,000.00 Rp 400.00

Rp 14,900.00 Rp 13,487.00 Rp 28,387.00

Keuntungan dan Over head 10% Rp 2,838.70

Jumlah Rp 31,225.70

Page 13: Sopan Gadang Asli Penawaran

Page 13

NO. URAIAN HARGA SATUAN JUMLAH

1 2 3 4 5 6

JUMLAH SATUAN UPAH

JUMLAH SATUAN BAHAN

29 1 M2 Plesteran 1 Pc : 2 Ps, tebal 15 mm

0.1700 Zak Semen portland (50 Kg) Rp 49,000.00 Rp 8,330.00

0.0170 M3 Pasir pasangan Rp 65,000.00 Rp 1,105.00

0.2000 Oh Pekerja Rp 35,000.00 Rp 7,000.00

0.1500 Oh Tukang batu Rp 45,000.00 Rp 6,750.00

0.0150 Oh Kepala tukang Rp 50,000.00 Rp 750.00

0.0100 Oh Mandor Rp 40,000.00 Rp 400.00

Rp 14,900.00 Rp 9,435.00 Rp 24,335.00

Keuntungan dan Over head 10% Rp 2,433.50

Jumlah Rp 26,768.50

30 1 M2 Plesteran 1 Pc : 4 Ps, tebal 15 mm

0.1040 Zak Semen portland (50 Kg) Rp 49,000.00 Rp 5,096.00

0.0200 M3 Pasir pasangan Rp 65,000.00 Rp 1,300.00

0.2000 Oh Pekerja Rp 35,000.00 Rp 7,000.00

0.1500 Oh Tukang batu Rp 45,000.00 Rp 6,750.00

0.0150 Oh Kepala tukang Rp 50,000.00 Rp 750.00

0.0100 Oh Mandor Rp 40,000.00 Rp 400.00

Rp 14,900.00 Rp 6,396.00 Rp 21,296.00

Keuntungan dan Over head 10% Rp 2,129.60

Jumlah Rp 23,425.60

31 Memasang Profil Beton / M'

0.4000 Tukang Profil Rp 45,000.00 Rp 18,000.00

0.1000 Pekerja Rp 35,000.00 Rp 3,500.00

0.0600 Mandor Rp 40,000.00 Rp 2,400.00

0.4500 Sak Semen Rp 49,000.00 Rp 22,050.00

0.2000 M3 pasir Pasang Rp 65,000.00 Rp 13,000.00

Rp 23,900.00 Rp 35,050.00 Rp 58,950.00

Keuntungan dan Over head 10% Rp 5,895.00

Jumlah Rp 64,845.00

32 1 M3 Pasang Konstruksi Kayu Kuda-Kuda

1.1000 M3 Kayu Klas II Rp 2,000,000.00 Rp 2,200,000.00

15.0000 Kg Besi strip Rp 65,000.00 Rp 975,000.00

5.6000 Kg Paku biasa 2" - 5" Rp 15,000.00 Rp 84,000.00

4.0000 Oh Pekerja Rp 35,000.00 Rp 140,000.00

12.0000 Oh Tukang kayu Rp 45,000.00 Rp 540,000.00

1.2000 Oh Kepala tukang Rp 50,000.00 Rp 60,000.00

0.2000 Oh Mandor Rp 40,000.00 Rp 8,000.00

Rp 748,000.00 Rp 3,259,000.00 Rp 4,007,000.00

Keuntungan dan Over head 10% Rp 400,700.00

Jumlah Rp 4,407,700.00

33 1 M3 Pasang Konstruksi Gording Kayu Klas II

1.1000 M3 Kayu Klas II Rp 2,000,000.00 Rp 2,200,000.00

15.0000 Kg Besi strip Rp 65,000.00 Rp 975,000.00

3.0000 Kg Paku biasa 2" - 5" Rp 15,000.00 Rp 45,000.00

2.4000 Oh Pekerja Rp 35,000.00 Rp 84,000.00

7.2000 Oh Tukang kayu Rp 45,000.00 Rp 324,000.00

0.7200 Oh Kepala tukang Rp 50,000.00 Rp 36,000.00

0.1200 Oh Mandor Rp 40,000.00 Rp 4,800.00

Rp 448,800.00 Rp 3,220,000.00 Rp 3,668,800.00

Keuntungan dan Over head 10% Rp 366,880.00

Jumlah Rp 4,035,680.00

34 1 M2 Residu Kuda-Kuda + Gording

0.3500 Ltr Residu Rp 3,500.00 Rp 1,225.00

0.1000 Oh Pekerja Rp 35,000.00 Rp 3,500.00

0.0060 Oh Mandor Rp 40,000.00 Rp 240.00

Rp 3,740.00 Rp 1,225.00 Rp 4,965.00

Keuntungan dan Over head 10% Rp 496.50

Jumlah Rp 5,461.50

Page 14: Sopan Gadang Asli Penawaran

Page 14

NO. URAIAN HARGA SATUAN JUMLAH

1 2 3 4 5 6

JUMLAH SATUAN UPAH

JUMLAH SATUAN BAHAN

35 1 M2 Pasang Lespalang 2 x ( 3 x 20 )

0.0145 M3 Kayu Klas II Rp 2,000,000.00 Rp 29,000.00

0.0600 Kg Paku biasa 2" - 5" Rp 15,000.00 Rp 900.00

0.1500 Oh Pekerja Rp 35,000.00 Rp 5,250.00

0.2500 Oh Tukang kayu Rp 45,000.00 Rp 11,250.00

0.0250 Oh Kepala tukang Rp 50,000.00 Rp 1,250.00

0.0750 Oh Mandor Rp 40,000.00 Rp 3,000.00

Rp 20,750.00 Rp 29,900.00 Rp 50,650.00

Keuntungan dan Over head 10% Rp 5,065.00

Jumlah Rp 55,715.00

36 1 M2 Pasang Atap Seng Gelombang Warna

0.7000 Lbr Seng Gelombang Warna Rp 55,000.00 Rp 38,500.00

0.0200 Kg Paku atap Rp 25,000.00 Rp 500.00

0.1200 Oh Pekerja Rp 35,000.00 Rp 4,200.00

0.0600 Oh Tukang kayu Rp 45,000.00 Rp 2,700.00

0.0060 Oh Kepala tukang Rp 50,000.00 Rp 300.00

0.0060 Oh Mandor Rp 40,000.00 Rp 240.00

Rp 7,440.00 Rp 39,000.00 Rp 46,440.00

Keuntungan dan Over head 10% Rp 4,644.00

Jumlah Rp 51,084.00

37 1 M1 Pasang Atap Nok Seng

0.3000 Lbr Seng plat BJLS 30 Rp 55,000.00 Rp 16,500.00

0.0400 Kg Paku atap Rp 25,000.00 Rp 1,000.00

0.1500 Oh Pekerja Rp 35,000.00 Rp 5,250.00

0.0700 Oh Tukang kayu Rp 45,000.00 Rp 3,150.00

0.0080 Oh Kepala Tukang Rp 50,000.00 Rp 400.00

0.0060 Oh Mandor Rp 40,000.00 Rp 240.00

Rp 9,040.00 Rp 17,500.00 Rp 26,540.00

Keuntungan dan Over head 10% Rp 2,654.00

Jumlah Rp 29,194.00

38 1 M1 Pasang Bola Bola Atap

0.2000 Lbr Seng plat BJLS 30 Rp 55,000.00 Rp 11,000.00

0.0150 Kg Paku atap Rp 25,000.00 Rp 375.00

0.1000 Pekerja Rp 35,000.00 Rp 3,500.00

0.2000 Tukang Kayu Rp 45,000.00 Rp 9,000.00

0.0200 Kepala Tukang Rp 50,000.00 Rp 1,000.00

Rp 13,500.00 Rp 11,375.00 Rp 24,875.00

Keuntungan dan Over head 10% Rp 2,487.50

Jumlah Rp 27,362.50

39 1 M2 Pasang Rangka Loteng

0.0230 M3 Kayu Balok Kls II Rp 2,000,000.00 Rp 46,000.00

0.1500 Kg Paku Biasa 2" - 5" Rp 15,000.00 Rp 2,250.00

0.2000 Oh Pekerja Rp 35,000.00 Rp 7,000.00

0.3000 Oh Tukang kayu Rp 45,000.00 Rp 13,500.00

0.0300 Oh Kepala tukang Rp 50,000.00 Rp 1,500.00

0.0100 Oh Mandor Rp 40,000.00 Rp 400.00

Rp 22,400.00 Rp 48,250.00 Rp 70,650.00

Keuntungan dan Over head 10% Rp 7,065.00

Jumlah Rp 77,715.00

40 1 M2 Langit-langit triplek 4 mm ( 60 x 120 ) cm

0.3750 Lbr Triplek 4 mm Rp 50,000.00 Rp 18,750.00

0.0300 Kg Paku Triplek Rp 15,000.00 Rp 450.00

0.0700 Oh Pekerja Rp 35,000.00 Rp 2,450.00

0.1000 Oh Tukang kayu Rp 45,000.00 Rp 4,500.00

0.0100 Oh Kepala tukang Rp 50,000.00 Rp 500.00

0.0035 Oh Mandor Rp 40,000.00 Rp 140.00

Rp 7,590.00 Rp 19,200.00 Rp 26,790.00

Keuntungan dan Over head 10% Rp 2,679.00

Jumlah Rp 29,469.00

Page 15: Sopan Gadang Asli Penawaran

Page 15

NO. URAIAN HARGA SATUAN JUMLAH

1 2 3 4 5 6

JUMLAH SATUAN UPAH

JUMLAH SATUAN BAHAN

41 Analisa Memasang Lambersering / M2

3.3000 Btg Lambersering Rp 11,500.00 Rp 37,950.00

0.2000 Kg Besi Paku 1" Rp 15,000.00 Rp 3,000.00

0.2800 Oh Pekerja Rp 35,000.00 Rp 9,800.00

0.2000 Oh Tukang Kayu Rp 45,000.00 Rp 9,000.00

0.0200 Oh Kepala Tukang Kayu Rp 50,000.00 Rp 1,000.00

0.0140 Oh Mandor Rp 40,000.00 Rp 560.00

Rp 20,360.00 Rp 40,950.00 Rp 61,310.00

Keuntungan dan Over head 10% Rp 6,131.00

Jumlah Rp 67,441.00

42 1 M' Pasang list plafond kayu profil

1.0500 M1 Kayu profil 4,5 X 4.5 cm Rp 2,000.00 Rp 2,100.00

0.0210 Oh Pekerja Rp 35,000.00 Rp 735.00

0.0210 Oh Tukang kayu Rp 45,000.00 Rp 945.00

0.0020 Oh Kepala tukang Rp 50,000.00 Rp 100.00

0.0010 Oh Mandor Rp 40,000.00 Rp 40.00

Rp 1,820.00 Rp 2,100.00 Rp 3,920.00

Keuntungan dan Over head 10% Rp 392.00

Jumlah Rp 4,312.00

43 1 M2 Pasang Pintu Panil

0.0400 M3 Kayu Papan Klas I Rp 2,500,000.00 Rp 100,000.00

0.0500 Kg Paku biasa 2" - 5" Rp 15,000.00 Rp 750.00

1.0000 Oh Pekerja Rp 35,000.00 Rp 35,000.00

2.5000 Oh Tukang kayu Rp 45,000.00 Rp 112,500.00

0.2500 Oh Kepala tukang Rp 50,000.00 Rp 12,500.00

0.0500 Oh Mandor Rp 40,000.00 Rp 2,000.00

Rp 162,000.00 Rp 100,750.00 Rp 262,750.00

Keuntungan dan Over head 10% Rp 26,275.00

Jumlah Rp 289,025.00

44 1 M2 Pasang Jendela Kaca Kayu + Rangka Kaca tebal 3 mm

0.0140 M3 Kayu Papan Klas I Rp 2,500,000.00 Rp 35,000.00

1.0000 Kg Kaca Warna 3 mm Rp 50,000.00 Rp 50,000.00

0.8000 Oh Pekerja Rp 35,000.00 Rp 28,000.00

2.0000 Oh Tukang kayu Rp 45,000.00 Rp 90,000.00

0.2000 Oh Kepala tukang Rp 50,000.00 Rp 10,000.00

0.0400 Oh Mandor Rp 40,000.00 Rp 1,600.00

Rp 129,600.00 Rp 85,000.00 Rp 214,600.00

Keuntungan dan Over head 10% Rp 21,460.00

Jumlah Rp 236,060.00

45 1 M2 Pasang Kaca Mati Tebal 5 mm

1.1000 M2 Kaca Warna 5 mm Rp 85,000.00 Rp 93,500.00

0.0150 Oh Pekerja Rp 35,000.00 Rp 525.00

0.1500 Oh Tukang kayu Rp 45,000.00 Rp 6,750.00

0.0150 Oh Kepala tukang Rp 50,000.00 Rp 750.00

0.0008 Oh Mandor Rp 40,000.00 Rp 30.00

Rp 8,055.00 Rp 93,500.00 Rp 101,555.00

Keuntungan dan Over head 10% Rp 10,155.50

Jumlah Rp 111,710.50

46 1 Buah Pasang Kunci SES

1.0000 Bh Kunci Rp 150,000.00 Rp 150,000.00

0.0050 Oh Pekerja Rp 35,000.00 Rp 175.00

0.5000 Oh Tukang kayu Rp 45,000.00 Rp 22,500.00

0.0050 Oh Kepala Tukang Rp 50,000.00 Rp 250.00

0.0003 Oh Mandor Rp 40,000.00 Rp 10.00

Rp 22,935.00 Rp 150,000.00 Rp 172,935.00

Keuntungan dan Over head 10% Rp 17,293.50

Jumlah Rp 190,228.50

47 1 Buah Pasang Engsel Pintu

1.0000 Bh Engsel pintu Rp 12,000.00 Rp 12,000.00

0.0150 Oh Pekerja Rp 35,000.00 Rp 525.00

0.1500 Oh Tukang kayu Rp 45,000.00 Rp 6,750.00

0.0150 Oh Kepala Tukang Rp 50,000.00 Rp 750.00

0.0008 Oh Mandor Rp 40,000.00 Rp 30.00

Rp 8,055.00 Rp 12,000.00 Rp 20,055.00

Keuntungan dan Over head 10% Rp 2,005.50

Jumlah Rp 22,060.50

Page 16: Sopan Gadang Asli Penawaran

Page 16

NO. URAIAN HARGA SATUAN JUMLAH

1 2 3 4 5 6

JUMLAH SATUAN UPAH

JUMLAH SATUAN BAHAN

48 1 Buah Pasang Engsel Jendela

1.0000 Bh Engsel jendela Rp 10,000.00 Rp 10,000.00

0.0100 Oh Pekerja Rp 35,000.00 Rp 350.00

0.1000 Oh Tukang kayu Rp 45,000.00 Rp 4,500.00

0.0100 Oh Kepala Tukang Rp 50,000.00 Rp 500.00

0.0005 Oh Mandor Rp 40,000.00 Rp 20.00

Rp 5,370.00 Rp 10,000.00 Rp 15,370.00

Keuntungan dan Over head 10% Rp 1,537.00

Jumlah Rp 16,907.00

49 1 Buah pasang Gerendel Pintu

1.0000 Bh Gerendel Pintu Rp 12,000.00 Rp 12,000.00

0.0200 Oh Pekerja Rp 35,000.00 Rp 700.00

0.2000 Oh Tukang kayu Rp 45,000.00 Rp 9,000.00

0.0200 Oh Kepala tukang Rp 50,000.00 Rp 1,000.00

0.0010 Oh Mandor Rp 40,000.00 Rp 40.00

Rp 10,740.00 Rp 12,000.00 Rp 22,740.00

Keuntungan dan Over head 10% Rp 2,274.00

Jumlah Rp 25,014.00

50 1 Buah pasang Gerendel Jendela

1.0000 Bh Gerendel Jendela Rp 8,000.00 Rp 8,000.00

0.0200 Oh Pekerja Rp 35,000.00 Rp 700.00

0.2000 Oh Tukang kayu Rp 45,000.00 Rp 9,000.00

0.0200 Oh Kepala tukang Rp 50,000.00 Rp 1,000.00

0.0010 Oh Mandor Rp 40,000.00 Rp 40.00

Rp 10,740.00 Rp 8,000.00 Rp 18,740.00

Keuntungan dan Over head 10% Rp 1,874.00

Jumlah Rp 20,614.00

51 1 Buah pasang Kait angin

1.0000 Bh Kait angin Rp 7,000.00 Rp 7,000.00

0.0150 Oh Pekerja Rp 35,000.00 Rp 525.00

0.1500 Oh Tukang kayu Rp 45,000.00 Rp 6,750.00

0.0150 Oh Kepala tukang Rp 50,000.00 Rp 750.00

0.0008 Oh Mandor Rp 40,000.00 Rp 30.00

Rp 8,055.00 Rp 7,000.00 Rp 15,055.00

Keuntungan dan Over head 10% Rp 1,505.50

Jumlah Rp 16,560.50

52 1 Buah Pasang Tangan-Tangan

1.0000 Bh Tangan-Tangan Rp 7,000.00 Rp 7,000.00

0.0150 Oh Pekerja Rp 35,000.00 Rp 525.00

0.1500 Oh Tukang kayu Rp 45,000.00 Rp 6,750.00

0.0150 Oh Kepala tukang Rp 50,000.00 Rp 750.00

0.0008 Oh Mandor Rp 40,000.00 Rp 30.00

Rp 8,055.00 Rp 7,000.00 Rp 15,055.00

Keuntungan dan Over head 10% Rp 1,505.50

Jumlah Rp 16,560.50

53 1 M2 Pasang Lantai Keramik 30 x 30 cm

1.0000 M2 Keramik 30 x 30 cm Rp 42,000.00 Rp 42,000.00

0.2270 Zak Semen portland (50 kg) Rp 49,000.00 Rp 11,123.00

0.0420 M3 Pasir pasang Rp 65,000.00 Rp 2,730.00

1.5000 Kg Semen warna Rp 6,000.00 Rp 9,000.00

0.6200 Oh Pekerja Rp 35,000.00 Rp 21,700.00

0.3500 Oh Tukang batu Rp 45,000.00 Rp 15,750.00

0.0350 Oh Kepaka Tukang Rp 50,000.00 Rp 1,750.00

0.0300 Oh Mandor Rp 40,000.00 Rp 1,200.00

Rp 40,400.00 Rp 64,853.00 Rp 105,253.00

Keuntungan dan Over head 10% Rp 10,525.30

Jumlah Rp 115,778.30

Page 17: Sopan Gadang Asli Penawaran

Page 17

NO. URAIAN HARGA SATUAN JUMLAH

1 2 3 4 5 6

JUMLAH SATUAN UPAH

JUMLAH SATUAN BAHAN

54 1 M2 Pasang Lantai Keramik 30 x 30 cm ( Anti Slip )

1.0000 M2 Keramik 30 x 30 cm ( Anti Slip ) Rp 45,000.00 Rp 45,000.00

0.2270 Zak Semen portland (50 kg) Rp 49,000.00 Rp 11,123.00

0.0420 M3 Pasir pasang Rp 65,000.00 Rp 2,730.00

1.5000 Kg Semen warna Rp 6,000.00 Rp 9,000.00

0.6200 Oh Pekerja Rp 35,000.00 Rp 21,700.00

0.3500 Oh Tukang batu Rp 45,000.00 Rp 15,750.00

0.0350 Oh Kepaka Tukang Rp 50,000.00 Rp 1,750.00

0.0300 Oh Mandor Rp 40,000.00 Rp 1,200.00

Rp 40,400.00 Rp 67,853.00 Rp 108,253.00

Keuntungan dan Over head 10% Rp 10,825.30

Jumlah Rp 119,078.30

55 1 M2 Pasang Lantai Keramik 20 x 20 Anti slip

1.0000 M2 Keramik 20 x 20 Anti Slip Rp 40,000.00 Rp 40,000.00

0.2270 Zak Semen portland (50 kg) Rp 49,000.00 Rp 11,123.00

0.0420 M3 Pasir pasang Rp 65,000.00 Rp 2,730.00

1.5000 Kg Semen warna Rp 6,000.00 Rp 9,000.00

0.6200 Oh Pekerja Rp 35,000.00 Rp 21,700.00

0.3500 Oh Tukang batu Rp 45,000.00 Rp 15,750.00

0.0350 Oh Kepaka Tukang Rp 50,000.00 Rp 1,750.00

0.0300 Oh Mandor Rp 40,000.00 Rp 1,200.00

Rp 40,400.00 Rp 62,853.00 Rp 103,253.00

Keuntungan dan Over head 10% Rp 10,325.30

Jumlah Rp 113,578.30

56 1 M2 Pasang Lantai Keramik 20 x 20

1.0000 M2 Keramik 20 x 20 Rp 40,000.00 Rp 40,000.00

0.2270 Zak Semen portland (50 kg) Rp 49,000.00 Rp 11,123.00

0.0420 M3 Pasir pasang Rp 65,000.00 Rp 2,730.00

1.5000 Kg Semen warna Rp 6,000.00 Rp 9,000.00

0.6200 Oh Pekerja Rp 35,000.00 Rp 21,700.00

0.3500 Oh Tukang batu Rp 45,000.00 Rp 15,750.00

0.0350 Oh Kepaka Tukang Rp 50,000.00 Rp 1,750.00

0.0300 Oh Mandor Rp 40,000.00 Rp 1,200.00

Rp 40,400.00 Rp 62,853.00 Rp 103,253.00

Keuntungan dan Over head 10% Rp 10,325.30

Jumlah Rp 113,578.30

57 1 M2 Pasang Dinding Keramik 20 x 25 cm

1.0000 M2 Keramik 20 x 25 cm Rp 40,000.00 Rp 40,000.00

0.1860 Zak Semen portland (50 kg) Rp 49,000.00 Rp 9,114.00

0.0180 M3 Pasir pasang Rp 65,000.00 Rp 1,170.00

1.5000 Kg Semen warna Rp 6,000.00 Rp 9,000.00

0.6000 Oh Pekerja Rp 35,000.00 Rp 21,000.00

0.4500 Oh Tukang batu Rp 45,000.00 Rp 20,250.00

0.0450 Oh Kepaka Tukang Rp 50,000.00 Rp 2,250.00

0.0300 Oh Mandor Rp 40,000.00 Rp 1,200.00

Rp 44,700.00 Rp 59,284.00 Rp 103,984.00

Keuntungan dan Over head 10% Rp 10,398.40

Jumlah Rp 114,382.40

58 1 M1 Pasang plint keramik artistik 8 x 20 cm

5.0000 Bh Plint keramik artistik 8 x 20 cm Rp 2,000.00 Rp 10,000.00

0.0330 Zak Semen portland ( 50 Kg) Rp 49,000.00 Rp 1,617.00

0.0032 M3 Pasir pasang Rp 65,000.00 Rp 208.00

0.1000 Kg Semen warna Rp 6,000.00 Rp 600.00

0.0900 Oh Pekerja Rp 35,000.00 Rp 3,150.00

0.0900 Oh Tukang batu Rp 45,000.00 Rp 4,050.00

0.0090 Oh Kepala tukang Rp 50,000.00 Rp 450.00

0.0045 Oh Mandor Rp 40,000.00 Rp 180.00

Rp 7,830.00 Rp 12,425.00 Rp 20,255.00

Keuntungan dan Over head 10% Rp 2,025.50

Jumlah Rp 22,280.50

Page 18: Sopan Gadang Asli Penawaran

Page 18

NO. URAIAN HARGA SATUAN JUMLAH

1 2 3 4 5 6

JUMLAH SATUAN UPAH

JUMLAH SATUAN BAHAN

59 Pas. Bon-bon Keramik / 1 M'

1.0000 M' Bon-bon Rp 5,000.00 Rp 5,000.00

0.0200 Zak Semen (50 Kg) Rp 49,000.00 Rp 980.00

0.0100 Kg Semen AFA Rp 6,000.00 Rp 60.00

0.1000 Oh Pekerja Rp 35,000.00 Rp 3,500.00

0.1000 Oh Tukang Batu Rp 45,000.00 Rp 4,500.00

0.0100 Oh Kep. Tukang Batu Rp 50,000.00 Rp 500.00

0.0100 Oh Mandor Rp 40,000.00 Rp 400.00

Rp 8,900.00 Rp 6,040.00 Rp 14,940.00

Keuntungan dan Over head 10% Rp 1,494.00

Jumlah Rp 16,434.00

60 Pasangan Batu Alam / M2

0.5000 Oh Pekerja Rp 35,000.00 Rp 17,500.00

0.0500 Oh Mandor Rp 40,000.00 Rp 2,000.00

0.5000 Oh Tukang Batu Rp 45,000.00 Rp 22,500.00

0.0500 Oh Kep. Tukang Batu Rp 50,000.00 Rp 2,500.00

0.0100 M3 Pasir Pasang Rp 65,000.00 Rp 650.00

0.1470 Zak Semen Rp 49,000.00 Rp 7,203.00

1.0000 M2 Batu Alam Rp 150,000.00 Rp 150,000.00

Rp 44,500.00 Rp 157,853.00 Rp 202,353.00

Keuntungan dan Over head 10% Rp 20,235.30

Jumlah Rp 222,588.30

61 Memasang 1 buah Kloset Jongkok Porselen

1.0000 Bh Klosed jongkok porselen Rp 130,000.00 Rp 130,000.00

0.1200 Zak Semen portland (50 Kg) Rp 49,000.00 Rp 5,880.00

0.0100 M3 Pasir pasang Rp 65,000.00 Rp 650.00

0.1000 Oh Pekerja Rp 35,000.00 Rp 3,500.00

1.5000 Oh Tukang batu Rp 45,000.00 Rp 67,500.00

1.5000 Oh Kepala tukang Rp 50,000.00 Rp 75,000.00

0.1600 Oh Mandor Rp 40,000.00 Rp 6,400.00

Rp 152,400.00 Rp 136,530.00 Rp 288,930.00

Keuntungan dan Over head 10% Rp 28,893.00

Jumlah Rp 317,823.00

62 Memasang 1 buah Washtafel Komplit

1.0000 Bh Wastafel Rp 450,000.00 Rp 450,000.00

0.1200 Zak Semen portland ( 50 Kg) Rp 27,500.00 Rp 3,300.00

0.0100 M3 Pasir pasang Rp 40,000.00 Rp 400.00

1.2000 Oh Pekerja Rp 18,000.00 Rp 21,600.00

1.4500 Oh Tukang batu Rp 11,500.00 Rp 16,675.00

0.1500 Oh Kepala tukang Rp 30,000.00 Rp 4,500.00

0.1000 Oh Mandor Rp 7,500.00 Rp 750.00

Rp 43,525.00 Rp 453,700.00 Rp 497,225.00

Keuntungan dan Over head 10% Rp 49,722.50

Jumlah Rp 546,947.50

63 Memasang 1 M1 Pipa GIP dia. 3/4"

1.2000 M1 Pipa GIP 3/4" Rp 18,000.00 Rp 21,600.00

0.0350 Pkt Perlengkapan (35 % dr harga pip Rp 6,300.00 Rp 220.50

0.0540 Oh Pekerja Rp 35,000.00 Rp 1,890.00

0.0900 Oh Tukang batu Rp 45,000.00 Rp 4,050.00

0.0090 Oh Kepala tukang Rp 50,000.00 Rp 450.00

0.0270 Oh Mandor Rp 40,000.00 Rp 1,080.00

Rp 7,470.00 Rp 21,820.50 Rp 29,290.50

Keuntungan dan Over head 10% Rp 2,929.05

Jumlah Rp 32,219.55

64 Memasang 1 M1 Pipa PVC tipe AW dia.3"

1.2000 M1 Pipa PVC Rp 27,500.00 Rp 33,000.00

0.0350 Pkt Perlengkapan Rp 9,625.00 Rp 336.88

0.0810 Oh Pekerja Rp 35,000.00 Rp 2,835.00

0.1350 Oh Tukang batu Rp 45,000.00 Rp 6,075.00

0.0135 Oh Kepala tukang Rp 50,000.00 Rp 675.00

0.0041 Oh Mandor Rp 40,000.00 Rp 164.00

Rp 9,749.00 Rp 33,336.88 Rp 43,085.88

Keuntungan dan Over head 10% Rp 4,308.59

Jumlah Rp 47,394.46

Page 19: Sopan Gadang Asli Penawaran

Page 19

NO. URAIAN HARGA SATUAN JUMLAH

1 2 3 4 5 6

JUMLAH SATUAN UPAH

JUMLAH SATUAN BAHAN

65 Memasang 1 M1 Pipa PVC tipe AW dia.4"

1.2000 M1 Pipa PVC Rp 40,000.00 Rp 48,000.00

0.0350 Pkt Perlengkapan Rp 14,000.00 Rp 490.00

0.0810 Oh Pekerja Rp 35,000.00 Rp 2,835.00

0.1350 Oh Tukang batu Rp 45,000.00 Rp 6,075.00

0.0135 Oh Kepala tukang Rp 50,000.00 Rp 675.00

0.0041 Oh Mandor Rp 40,000.00 Rp 164.00

Rp 9,749.00 Rp 48,490.00 Rp 58,239.00

Keuntungan dan Over head 10% Rp 5,823.90

Jumlah Rp 64,062.90

66 Memasang 1 Buah Kran dia.3/4" atau 1/2"

1.0000 Bh Kran air Rp 18,000.00 Rp 18,000.00

0.0250 Bh Seal tape Rp 1,800.00 Rp 45.00

0.0100 Oh Pekerja Rp 35,000.00 Rp 350.00

0.1000 Oh Tukang batu Rp 45,000.00 Rp 4,500.00

0.0100 Oh Kepala tukang Rp 50,000.00 Rp 500.00

0.0050 Oh Mandor Rp 40,000.00 Rp 200.00

Rp 5,550.00 Rp 18,045.00 Rp 23,595.00

Keuntungan dan Over head 10% Rp 2,359.50

Jumlah Rp 25,954.50

67 Memasang 1 Buah Floor Drain

1.0000 Bh Floor drain Rp 18,000.00 Rp 18,000.00

0.0100 Oh Pekerja Rp 35,000.00 Rp 350.00

0.1000 Oh Tukang batu Rp 45,000.00 Rp 4,500.00

0.0100 Oh Kepala tukang Rp 50,000.00 Rp 500.00

0.0050 Oh Mandor Rp 40,000.00 Rp 200.00

Rp 5,550.00 Rp 18,000.00 Rp 23,550.00

Keuntungan dan Over head 10% Rp 2,355.00

Jumlah Rp 25,905.00

68 Memasang 1 buah bak fibreglass

1.0000 Bh Bak fibreglass Rp 225,000.00 Rp 225,000.00

1.8000 Oh Pekerja Rp 35,000.00 Rp 63,000.00

2.7000 Oh Tukang batu Rp 45,000.00 Rp 121,500.00

0.5400 Oh Kepala tukang Rp 50,000.00 Rp 27,000.00

0.1100 Oh Mandor Rp 40,000.00 Rp 4,400.00

Rp 215,900.00 Rp 225,000.00 Rp 440,900.00

Keuntungan dan Over head 10% Rp 44,090.00

Jumlah Rp 484,990.00

69 Memasang 1 buah bak cuci piring stainles steel

1.0000 Bh Bak cuci stainles steel Rp 210,000.00 Rp 210,000.00

0.0300 Oh Pekerja Rp 35,000.00 Rp 1,050.00

0.3000 Oh Tukang batu Rp 45,000.00 Rp 13,500.00

0.0300 Oh Kepala tukang Rp 50,000.00 Rp 1,500.00

0.0015 Oh Mandor Rp 40,000.00 Rp 60.00

Rp 16,110.00 Rp 210,000.00 Rp 226,110.00

Keuntungan dan Over head 10% Rp 22,611.00

Jumlah Rp 248,721.00

70 Anal. Cat Impra Melamin Lack / M2

0.5000 Kg Cat dasar ( Wood Stain ) Rp 18,000.00 Rp 9,000.00

0.2500 Kg Melamin Sending ( Lack ) Rp 40,000.00 Rp 10,000.00

0.2500 Kg Melamin Clear Rp 45,000.00 Rp 11,250.00

0.2000 Ltr Tinner Rp 10,000.00 Rp 2,000.00

0.1000 Kg Wood Filler (Dempul Impra) Rp 55,000.00 Rp 5,500.00

2.0000 Lbr Amplas Rp 2,000.00 Rp 4,000.00

0.0090 Oh Tukang Cat Rp 45,000.00 Rp 405.00

0.0060 Oh Kepala Tukang Cat Rp 50,000.00 Rp 300.00

Rp 705.00 Rp 41,750.00 Rp 42,455.00

Keuntungan dan Over head 10% Rp 4,245.50

Jumlah Rp 46,700.50

Page 20: Sopan Gadang Asli Penawaran

Page 20

NO. URAIAN HARGA SATUAN JUMLAH

1 2 3 4 5 6

JUMLAH SATUAN UPAH

JUMLAH SATUAN BAHAN

71 1 M2 Pengecatan bidang kayu baru (1 lapis plamir) 1 lapis cat dasar 2 lapis cat penutup

0.2000 Kg Cat meni Rp 14,000.00 Rp 2,800.00

0.1500 Kg Plamir Rp 8,000.00 Rp 1,200.00

0.1700 Kg Cat dasar Rp 13,500.00 Rp 2,295.00

0.2600 Kg Cat minyak Rp 30,000.00 Rp 7,800.00

0.0700 Oh Pekerja Rp 35,000.00 Rp 2,450.00

0.0090 Oh Tukang cat Rp 45,000.00 Rp 405.00

0.0060 Oh Kepala tukang Rp 50,000.00 Rp 300.00

0.0025 Oh Mandor Rp 40,000.00 Rp 100.00

Rp 3,255.00 Rp 14,095.00 Rp 17,350.00

Keuntungan dan Over head 10% Rp 1,735.00

Jumlah Rp 19,085.00

72 1 M2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar 2 lapis cat penutup)

0.1000 Kg Plamir Rp 8,000.00 Rp 800.00

0.1000 Kg Cat dasar Rp 13,500.00 Rp 1,350.00

0.2600 Kg Cat Tembok Rp 11,500.00 Rp 2,990.00

0.0200 Oh Pekerja Rp 35,000.00 Rp 700.00

0.0630 Oh Tukang cat Rp 45,000.00 Rp 2,835.00

0.0063 Oh Kepala tukang Rp 50,000.00 Rp 315.00

0.0025 Oh Mandor Rp 40,000.00 Rp 100.00

Rp 3,950.00 Rp 5,140.00 Rp 9,090.00

Keuntungan dan Over head 10% Rp 909.00

Jumlah Rp 9,999.00

73 Mencat Kilat Batu Alam Dengan Cat Bitasol / 1 M2

0.2600 Kg Bitasol Rp 70,000.00 Rp 18,200.00

0.1000 Oh Tukang cat Rp 45,000.00 Rp 4,500.00

0.0100 Oh Kepala tukang Rp 50,000.00 Rp 500.00

0.0030 Oh Mandor Rp 40,000.00 Rp 120.00

Rp 5,120.00 Rp 18,200.00 Rp 23,320.00

Keuntungan dan Over head 10% Rp 2,332.00

Jumlah Rp 25,652.00

74 1 M2 Memeni Kayu

0.1200 Kg Meni Rp 14,000.00 Rp 1,680.00

0.0670 Oh Pekerja Rp 35,000.00 Rp 2,345.00

0.1000 Oh Tukang cat Rp 45,000.00 Rp 4,500.00

0.0100 Oh Kepala tukang Rp 50,000.00 Rp 500.00

0.0030 Oh Mandor Rp 40,000.00 Rp 120.00

Rp 7,465.00 Rp 1,680.00 Rp 9,145.00

Keuntungan dan Over head 10% Rp 914.50

Jumlah Rp 10,059.50

Payakumbuh, 4 Mei 2010

Penawar

CV. FANNELIN

HENDRI UTAMA

Direktur

Page 21: Sopan Gadang Asli Penawaran

HARGA SATUAN PEKERJAAN

KEGIATAN : REHAB SEDANG/ BERAT PUSKESMAS PEMBANTU

PEKERJAAN : PEMBANGUNAN POSKESRI SOPAN GADANG

LOKASI : MAEK KECAMATAN BUKIK BARISAN KABUPATEN LIMAPULUH KOTA

T.A : 2010.

No URAIAN PEKERJAAN HARGA SATUAN KET

1 1 M2 Membersihkan Lapangan dan Perataan Rp. 6,050.00

2 1 M' Pengukuran dan pemasangan bowplank Rp. 47,520.00

3 1 M3 Galian Tanah Biasa Sedalam 1 M' Rp. 17,160.00

4 1 M3 Urugan kembali Rp. 8,228.00

5 1 M3 Urugan pasir Rp. 51,590.00

6 1 M3 Urugan tanah Rp. 56,925.00

7 1 M3 Pas. pondasi batu kosong (aanstampang) Rp. 188,496.00

8 1 M3 Pasang pondasi batu kali 1 Pc : 4 Ps Rp. 421,894.00

9 1 M3 Membuat beton tumbuk 1 Pc : 3 Ps : 5 Kr Rp. 419,969.00

10 1 M3 Membuat beton 1 Pc : 2 Ps : 3 Kr Rp. 603,438.00

11 1 Kg Pembesian dengan besi polos atau besi ulir Rp. 11,854.70

12 1 M3 Stuut Werk / Perancah Rp. 1,415,150.00

13 1 M2 Pasang Bekisting Rp. 120,340.00

14 1 M3 Pekerjaan Sloof Beton Bertulang 15/20 Rp. 2,900,315.11

15 1 M3 Pekerjaan Kolom Beton Bertulang 15/50 Rp. 4,540,443.59

16 1 M3 Pekerjaan Kolom Praktis Beton Bertulang 13/13 Rp. 3,726,616.01

17 1 M3 Pekerjaan Balok Beton Bertulang 15/30 Rp. 3,347,945.44

18 1 M3 Pekerjaan Ring Balok Beton Bertulang 13/15 Rp. 3,609,111.33

19 1 M3 Pekerjaan Kolom Beton Bertulang 20/30 Rp. 2,371,367.17

20 1 M3 Pekerjaan Kolom Beton Bertulang 20/20 Rp. 2,698,223.21

21 Pekerjaan Plat Beton / 1 M3 Rp. 4,580,348.23

22 1 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps Rp. 182,358.00

23 1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps Rp. 87,825.10

24 1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps Rp. 80,151.50

25 1 M2 Pasangan bata merah tebal 1/4 bata, 1 Pc : 4 Ps Rp. 49,377.90

26 1 M3 Pasang Kosen Pintu dan Jendela Rp. 4,545,200.00

27 1 M2 Pasang Jalusi Kosen Rp. 264,825.00

28 1 M2 Plesteran 1 Pc : 1 Ps, tebal 15 mm (Afwerking) Rp. 31,225.70

29 1 M2 Plesteran 1 Pc : 2 Ps, tebal 15 mm Rp. 26,768.50

30 1 M2 Plesteran 1 Pc : 4 Ps, tebal 15 mm Rp. 23,425.60

31 Memasang Profil Beton / M' Rp. 64,845.00

32 1 M3 Pasang Konstruksi Kayu Kuda-Kuda Rp. 4,407,700.00

33 1 M3 Pasang Konstruksi Gording Kayu Klas II Rp. 4,035,680.00

34 1 M2 Residu Kuda-Kuda + Gording Rp. 5,461.50

35 1 M2 Pasang Lespalang 2 x ( 3 x 20 ) Rp. 55,715.00

36 1 M2 Pasang Atap Seng Gelombang Warna Rp. 51,084.00

37 1 M1 Pasang Atap Nok Seng Rp. 29,194.00

38 1 M1 Pasang Bola Bola Atap Rp. 27,362.50

39 1 M2 Pasang Rangka Loteng Rp. 77,715.00

40 1 M2 Langit-langit triplek 4 mm ( 60 x 120 ) cm Rp. 29,469.00

41 Analisa Memasang Lambersering / M2 Rp. 67,441.00

42 1 M' Pasang list plafond kayu profil Rp. 4,312.00

43 1 M2 Pasang Pintu Panil Rp. 289,025.00

44 1 M2 Pasang Jendela Kaca Kayu + Rangka Kaca tebal 3 mm Rp. 236,060.00

45 1 M2 Pasang Kaca Mati Tebal 5 mm Rp. 111,710.50

46 1 Buah Pasang Kunci SES Rp. 190,228.50

47 1 Buah Pasang Engsel Pintu Rp. 22,060.50

48 1 Buah Pasang Engsel Jendela Rp. 16,907.00

49 1 Buah pasang Gerendel Pintu Rp. 25,014.00

50 1 Buah pasang Gerendel Jendela Rp. 20,614.00

51 1 Buah pasang Kait angin Rp. 16,560.50

Page 22: Sopan Gadang Asli Penawaran

No URAIAN PEKERJAAN HARGA SATUAN KET

52 1 Buah Pasang Tangan-Tangan Rp. 16,560.50

53 1 M2 Pasang Lantai Keramik 30 x 30 cm Rp. 115,778.30

54 1 M2 Pasang Lantai Keramik 30 x 30 cm ( Anti Slip ) Rp. 119,078.30

55 1 M2 Pasang Lantai Keramik 20 x 20 Anti slip Rp. 113,578.30

56 1 M2 Pasang Lantai Keramik 20 x 20 Rp. 113,578.30

57 1 M2 Pasang Dinding Keramik 20 x 25 cm Rp. 114,382.40

58 1 M1 Pasang plint keramik artistik 8 x 20 cm Rp. 22,280.50

59 Pas. Bon-bon Keramik / 1 M' Rp. 16,434.00

60 Pasangan Batu Alam / M2 Rp. 222,588.30

61 Memasang 1 buah Kloset Jongkok Porselen Rp. 317,823.00

62 Memasang 1 buah Washtafel Komplit Rp. 546,947.50

63 Memasang 1 M1 Pipa GIP dia. 3/4" Rp. 32,219.55

64 Memasang 1 M1 Pipa PVC tipe AW dia.3" Rp. 47,394.46

65 Memasang 1 M1 Pipa PVC tipe AW dia.4" Rp. 64,062.90

66 Memasang 1 Buah Kran dia.3/4" atau 1/2" Rp. 25,954.50

67 Memasang 1 Buah Floor Drain Rp. 25,905.00

68 Memasang 1 buah bak fibreglass Rp. 484,990.00

69 Memasang 1 buah bak cuci piring stainles steel Rp. 248,721.00

70 Anal. Cat Impra Melamin Lack / M2 Rp. 46,700.50

71 1 M2 Pengecatan bidang kayu baru (1 lapis plamir) 1 lapis cat dasar 2 lapis cat pen Rp. 19,085.00

72 1 M2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar 2 lapis cat penutup)Rp. 9,999.00

73 Mencat Kilat Batu Alam Dengan Cat Bitasol / 1 M2 Rp. 25,652.00

74 1 M2 Memeni Kayu Rp. 10,059.50

75 1 M2 Pasangan Pagar Hollow 2x4, 4 x4 cm + Cat Rp. 320,000.00

76 1 M2 Pasangan Pagar Besi Siku L 30.30.3 + Cat Rp. 160,000.00

77 1 M2 Pasangan Pintu Gerbang ( Komplit ) + Cat Rp. 450,000.00

Payakumbuh, 4 Mei 2009

Penawar

CV. FANNELIN

HENDRI UTAMA

Direktur

Page 23: Sopan Gadang Asli Penawaran

DAFTAR HARGA SATUAN UPAH DAN BAHAN

KEGIATAN : REHAB SEDANG/ BERAT PUSKESMAS PEMBANTU

PEKERJAAN : PEMBANGUNAN POSKESRI SOPAN GADANG

LOKASI : MAEK KECAMATAN BUKIK BARISAN KABUPATEN LIMAPULUH KOTA

T. ANGGARAN : 2010.

No. JENIS BAHAN BANGUNAN STN HARGA SATUAN KETERANGAN

1 2 3 4 5

DAFTAR UPAH

1 Kepala Tukang Hari Rp. 50,000.00

2 Tukang Kayu Hari Rp. 45,000.00

3 Tukang Batu Hari Rp. 45,000.00

4 Tukang Besi Hari Rp. 45,000.00

5 Tukang Cat Hari Rp. 45,000.00

6 Mandor Hari Rp. 40,000.00

7 Pekerja Hari Rp. 35,000.00

DAFTAR BAHAN

1 Batu kali Rp. 95,000.00

2 Kerikil Cor Rp. 70,000.00

3 Pasir Pasang/ Beton Rp. 65,000.00

4 Pasir Urug Rp. 30,000.00

5 Tanah Timbunan Rp. 35,000.00

6 Kayu Balok Klas I Rp. 2,500,000.00

7 Kayu Papan Klas I Rp. 2,500,000.00

8 Kayu Balok Klas II Rp. 2,000,000.00

9 Kayu Papan Klas II Rp. 2,000,000.00

10 Kayu Balok Klas III Rp. 1,800,000.00

11 Kayu Papan Klas III Rp. 1,800,000.00

12 Kayu Balok Klas IV Rp. 1,500,000.00

13 Kayu Papan Klas IV Rp. 1,500,000.00

14 Kayu Perancah Rp. 1,000,000.00

15 Kayu Dolken Dia 8 Cm/ Panjang 4 M' Btg Rp. 18,000.00

16 Triplek 4 mm Lbr Rp. 50,000.00

17 Triplek 6 mm Lbr Rp. 65,000.00

18 Triplek 9 mm Lbr Rp. 95,000.00

19 Tiang Pancang Rp. 4,000.00

20 Lumbresering Btg Rp. 11,500.00

21 Kayu Les Profil 4,5 x 4,5 x 400 Rp. 2,000.00

22 Kayu Les 1 x 3 cm Btg Rp. 10,000.00

23 Semen Padang Zak Rp. 49,000.00

24 Semen Putih Kg Rp. 1,800.00

25 Batu Bata Bh Rp. 600.00

26 Besi Beton Polos Kg Rp. 9,500.00

27 Kawat Beton Kg Rp. 13,000.00

28 Atap Seng Gelombang Warna Hl Rp. 55,000.00

29 Seng Plat Warna Hl Rp. 55,000.00

30 Paku Atap Seng Warna Kg Rp. 25,000.00

31 Paku Biasa Kg Rp. 15,000.00

32 Paku Triplek Kg Rp. 15,000.00

33 Mur + Baut Bh Rp. 2,500.00

34 Angkur Kusen Bh Rp. 2,000.00

35 Keramik 30 x 30 cm Rp. 42,000.00

36 Keramik 30 x 30 cm Anti Slip Rp. 45,000.00

37 Keramik 20 x 20 cm Anti Slip Rp. 40,000.00

38 Keramik 20 x 25 cm Rp. 40,000.00

39 Keramik 20 x 20 Rp. 40,000.00

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M1

M1

M2

M2

M2

M2

M2

Page 24: Sopan Gadang Asli Penawaran

No. JENIS BAHAN BANGUNAN STN HARGA SATUAN KETERANGAN

1 2 3 4 5

40 Keramik Artistik 8 x 25 Cm Bh Rp. 2,000.00

41 Batu Alam Rp. 150,000.00

42 Bon-bon Keramik Rp. 5,000.00

43 Semen Warna (Tepung Afa) Kg Rp. 6,000.00

44 Kaca Warna 5 mm Rp. 85,000.00

45 Kaca Warna 3 mm Rp. 50,000.00

46 Kloset Jongkok Setara Setara Total Bh Rp. 130,000.00

47 Engsel Nylon Pintu Bh Rp. 12,000.00

48 Engsel Nylon Jendela Bh Rp. 10,000.00

49 Kunci Tanam Slilinder SES Bh Rp. 150,000.00

50 Gerendel Pintu Bh Rp. 12,000.00

51 Gerendel Jendela Bh Rp. 8,000.00

52 Tangan-tangan Jendela Bh Rp. 7,000.00

53 Hak Angin Bh Rp. 7,000.00

54 Floor Drain Bh Rp. 18,000.00

55 Pintu Fiber Komplit Unit Rp. 230,000.00 Terpasang

56 Bak Cuci Piring Stainless Unit Rp. 210,000.00

57 Bak Fiber 60x60x69 Unit Rp. 225,000.00

58 Washtafel Komplit Unit Rp. 450,000.00

59 Pipa GIP 3/4" Rp. 18,000.00

60 Seal Tape Bh Rp. 1,800.00

61 Pipa Galvanis 2" Rp. 27,000.00

62 Pipa PVC 3" Setara AW Panjang 6 M' Rp. 27,500.00

63 Pipa PVC 4" Setara AW Panjang 6 M' Rp. 40,000.00

64 Kran Air Bh Rp. 18,000.00

65 Cat Tembok Setara CATYLAC Kg Rp. 11,500.00

66 Cat Minyak Kg Rp. 30,000.00

67 Minyak Cat Ltr Rp. 7,500.00

68 Minyak Bekisting(Oli Bekas) Ltr Rp. 2,000.00

69 Residu Kg Rp. 3,500.00

70 Meni Kg Rp. 14,000.00

71 Cat Dasar Kg Rp. 13,500.00

72 Plamur Kg Rp. 8,000.00

73 Dempul Wall Putty Kg Rp. 8,000.00

74 Thinner Kg Rp. 10,000.00

75 Impra Kg Rp. 38,000.00

76 Amplas Hl Rp. 2,000.00

77 Cat dasar Impra ( Wood Stain ) Kg Rp. 18,000.00

78 Melamin Sending ( Lack ) Kg Rp. 40,000.00

79 Melamin Clear Kg Rp. 45,000.00

80 Wood Filler (Dempul Impra) Kg Rp. 55,000.00

81 Cat Batu Alam Bitasol / Mowilex Kg Rp. 70,000.00

82 Tambah Daya 1300 Watt Paket Rp. 2,000,000.00

83 Pasangan Instalasi Listrik Ttk Rp. 120,000.00

84 Stop Kontak Bh Rp. 12,000.00

85 Saklar Tunggal Bh Rp. 10,000.00

86 Saklar Double Bh Rp. 9,500.00

87 Saklar Triple Bh Rp. 10,500.00

88 Lampu Energy Saver 18 Watt Setara Phillips Bh Rp. 35,000.00

89 Box Panel Unit Rp. 200,000.00

90 Plank Merek Ls Rp. 200,000.00

91 Ijuk Kg Rp. 15,000.00

92 Pasangan Pagar Hollow 2x4, 4 x4 cm + Cat Rp. 320,000.00 Terpasang

93 Pasangan Pagar Besi Siku L 30.30.3 + Cat Rp. 160,000.00 Terpasang

94 Pasangan Pintu Gerbang ( Komplit ) + Cat Rp. 450,000.00 Terpasang

M2

M1

M2

M2

M1

M1

M1

M1

M2

M2

M2

Page 25: Sopan Gadang Asli Penawaran

No. JENIS BAHAN BANGUNAN STN HARGA SATUAN KETERANGAN

1 2 3 4 5

Payakumbuh, 4 Mei 2010

Penawar

CV. FANNELIN

HENDRI UTAMA

Direktur

Page 26: Sopan Gadang Asli Penawaran

RUMAH 187,077,000.00 PAGAR 53,241,000.00 TOTAL 240,319,000.00 100.00 %

240,319,000.00 87.55 %

Page 27: Sopan Gadang Asli Penawaran

T I M E S C H E D U L E

KEGIATAN : REHAB SEDANG/ BERAT PUSKESMAS PEMBANTUPEKERJAAN : PEMBANGUNAN POSKESRI SOPAN GADANGLOKASI : MAEK KECAMATAN BUKIK BARISAN KABUPATEN LIMAPULUH KOTAT. ANGGARAN : 2010.

NO. URAIAN PEKERJAAN

JANGKA WAKTU PELAKSANAAN

KET BOBOT MINGGU KE … PRESTASI

(%) 1 2 3 4 5 6 7 8 9 10 11 12 13

A. BANGUNAN PUSKESMAS PEMBANTUI PEKERJAAN PENDAHULUAN 100 %

1 Pasangan Plank Papan Nama Proyek 0.09 0.09

2 Pembersihan Lapangan Dan Perataan 0.37 0.37

3 Pasang Papan Bouwplank 1.04 1.04

II PEKERJAAN PONDASI1 Galian Tanah Pondasi 0.46 0.46

2 Pasangan Aanstampang Batu Kali 1.01 1.01

3 Pasangan Pondasi Batu Kali 4.83 2.41 2.41

4 Urugan Kembali 0.06 0.06

III PEKERJAAN BETON BERTULANG1 Pekerjaan Sloof Beton 15/20 2.93 2.93

2 Pekerjaan Kolom Praktis 13/13 2.49 0.83 0.83 0.83

3 Pekerjaan Balok 15/30 Teras 0.32 0.32

4 Pekerjaan Balok 13/13 Untuk Plat Beton Teras 0.06 0.06

5 Pekerjaan Ring Balok 13/15 2.37 2.37

6 Pekerjaan Plat Beton, Tebal 7 Cm 0.19 0.19

7 Pek. Plat Beton, Tebal 7 Cm Untuk Meja Dapur 0.16 0.16

IV PEKERJAAN DINDING1 Pasangan Dinding Bata 1:2 0.74 0.74

2 Pasangan Dinding Bata 1:4 7.10 2.37 2.37 2.37

3 Pasangan Batu Alam 0.96 0.96

4 Pekerjaan Rangka Kusen 3.01 1.51 1.51

5 Memenie Rangka Kusen Yang Menyentuh Pasangan 0.10 0.05 0.05

6 Pasangan Baut Angker Kusen 0.06 0.03 0.03

7 Pasangan Keramik Dinding 20/25 UntukWC/KM 0.63 0.63

8 Pasangan Les Keramik Artistik 8/20 0.11 0.11

V PEKERJAAN ATAP1 Pas. Kuda-Kuda 4.91 2.45 2.45

2 Pas. Gording 2.91 2.91

3 Angker Kuda-Kuda + Baut 0.12 0.06 0.06

4 Pek. Residu 0.32 0.32

5 Pasangan Lesplank Papan Double Dirotter 0.30 0.30

6 Pasangan Atap Seng Warna Gelombang BJLSK 20 3.15 3.15

7 Pasangan Perabung Atap Seng Warna BJLSK 30 0.17 0.17

VI PEKERJAAN PLESTERAN1 Plesteran Dinding 1:2 Ditaring Licin 0.45 0.45

2 Plesteran Dinding 1:4 Ditaring Licin 4.39 2.19 2.19

3 Afwerking Beton 0.05 0.05

VII PEKERJAAN PLAFOND1 Pasangan Rangka Plafon 4.09 2.05 2.05

2 Pasangan Plafon Triplek 0.93 0.93

3 Pasangan Plafon Lumbresering 1.42 1.42

4 Pasangan Les Profil 4,5 x 4,5 x 400 0.28 0.28

VIII PEKERJAAN LANTAI1 Pekerjaan Urugan Tanah 0.19 0.19

2 Pekerjaan Urugan Pasir 0.17 0.17

3 Pekerjaan Cor Beton Tumbuk 1:3:5 Tebal 7 Cm 1.02 1.02

Page 28: Sopan Gadang Asli Penawaran

4 Pas. Keramik Lantai 30 x 30 3.47 1.73 1.73

5 Pas. Keramik Lantai 30 x 30 Anti Slip 0.58 0.58

6 Pas. Keramik Lantai 20 x 20 Anti Slip untuk KM/WC 0.19 0.19

7 Pasangan Keramik 20/20 Untuk Meja Dapur 0.05 0.05

8 Pasangan Bon - Bon 0.13 0.13

IX PEKERJAAN PINTU & JENDELAA Pekerjaan Pintu Dan Jendela1 Pekerjaan Pintu Panil 2.02 1.01 1.01

2 Pekerjaan Jendela Rangka Kaca Warna Tebal 3 mm 1.69 0.84 0.84

3 Pasangan Jalusi Ventilasi 0.41 0.41

4 Pasangan Pintu Fiber komplit 0.21 0.11 0.11

B Penggantung / Pengunci1 Pas. Kunci Pintu 2 Slaagh 0.78 0.39 0.39

2 Pas. Engsel Pintu 0.27 0.14 0.14

3 Pas. Gerendel Pintu 0.09 0.09

4 Pas. Engsel Jendela 0.31 0.15 0.15

5 Pas. Gerendel Jendela 0.38 0.19 0.19

6 Pas Hak Angin Jendela 0.30 0.15 0.15

7 Pas. Hand Vatten Jendela 0.15 0.08 0.08

X PEKERJAAN PENGECATAN1 Mencat Dinding + Plat Dengan Cat Air 3 x Jalan 2.04 0.68 0.68 0.68

2 Mencat Plafon Triplek Dengan Cat Air 3 x Jalan 0.32 0.16 0.16 50 %

3 Mencat Kayu Yang Kelihatan Dengan Cat Minyak 1.25 0.62 0.62

4 Mencat Plafond Lambersiring Dengan Cat Impra 0.98 0.98

5 Mencat Batu Alam Dengan Cat Bitasol/ Wimolex 0.12 0.12

XI PEKERJAAN PERLENGKAPAN DALAMA LISTRIK1 Tambah Daya 1300 Watt 0.92 0.46 0.46

2 Pasangan Instalasi Listrik 1.10 0.55 0.55

3 Pasangan Lampu Phillips 18 Watt Enery Saver 0.18 0.18

5 Pasangan Saklar Double 0.01 0.01

6 Pasangan Saklar Tunggal 0.03 0.03

7 Pasangan Stop Kontak 0.05 0.05

8 Pasangan Panel Box MCB 2 Phase 0.09 0.09

B KM/WC/DAPUR1 Pasangan Kloset Jongkok 0.29 0.29

2 Pasangan Bak Fiber 60x60x69 0.44 0.44

3 Pasangan Kran Air 3/4" 0.02 0.02

4 Pasangan Floor Drain 0.02 0.02

5 Pasangan Bak Cuci Piring Stainless + Kran ( Komplit ) 0.11 0.11

C SANITASI1 Pasangan Pipa GIP Dia 3/4" 0.26 0.13 0.13

2 Pasangan Pipa PVC 3" 0.37 0.19 0.19

3 Pasangan Pipa PVC 4" 0.48 0.24 0.24

XII PEKERJAAN PERLENGKAPAN LUARA Pekerjaan Piring-Piring

1. Galian Tanah 0.01 0.01

2. Pasangan Batu Bata 0.68 0.68

3. Timbunan Pasir Bawah Lantai 0.08 0.08

4. Cor Lantai 1:3:5 Ditaring Licin 0.66 0.66

5. Plesteran Bata 0.10 0.10

Page 29: Sopan Gadang Asli Penawaran

B Septictank1 Septictank + Resapan

a. Galian Tanah Biasa 0.08 0.08

b. Urugan Kembali 1/4 Galian 0.01 0.01

c. Pasangan Batu Bata 1 Bata 1 : 2 0.83 0.83

d. Pasangan Batu Bata 1/2 Bata 1 : 2 0.09 0.09

e. Stamp Beton 1 : 3 : 5 0.07 0.07

f. Plesteran 1 : 2 0.10 0.10

g. Plat Beton Bertulang 1 : 2 : 3 0.73 0.73

h. Krekel 0.03 0.03

i. Pasir Urug 0.01 0.01

j. Pipa Hawa GIP dia. 2 " 0.02 0.02

k. Memasang Pipa PVC Dia. 4 " 0.18 0.18

l. Batu Kali 0.02 0.02

m. Ijuk 0.07 0.07

B. PEKERJAAN PAGAR KELILING BANGUNANI PEKERJAAN PENDAHULUAN1 Pasang Papan Bouwplank 0.26 0.26

II PEKERJAAN PONDASI1 Galian Tanah Pondasi 0.29 0.29

2 Pasangan Aanstampang Batu Kali 0.72 0.36 0.36

3 Pasangan Pondasi Batu Kali 2.03 2.03

4 Urugan Kembali 0.03 0.03

III PEKERJAAN BETON BERTULANG1 Pekerjaan Sloof Beton 15/20 2.79 2.79

2 Pekerjaan Kolom Beton 20/30 0.39 0.20 0.20

3 Pekerjaan Kolom 20/20 1.78 0.89 0.89

4 Pekerjaan Ring Balok 13/15 1.73 0.87 0.87

IV PEKERJAAN DINDING1 Pasangan Dinding Bata 1:4 2.37 1.18 1.18

2 Pasangan Pagar Besi Hollow 2x4 cm Dan 2x2 Cm + C 0.95 0.47 0.47

3 Pasangan Pagar Besi Siku L 30.30.3 + Cat 1.84 0.92 0.92

4 Pasangan Pintu Gerbang ( Komplit ) + Cat 0.89 0.44 0.44

5 Pasangan Logo Dan Merek Aluminium 2.77 1.39 1.39

V PEKERJAAN PLESTERAN1 Plesteran Dinding 1:4 Ditaring Licin 1.90 0.95 0.95

2 Pekerjaan Afwerking Beton 0.46 0.23 0.23

VI PEKERJAAN PENGECATAN1 Mencat Dinding Pagar Dengan Cat Air 3 x Jalan 0.96 0.96 O. %

JUMLAH 100.00

JUMLAH BOBOT 5.40 6.01 6.54 7.89 7.22 10.74 9.46 10.21 8.13 7.55 7.64 7.12 6.10

BOBOT RENCANA 5.40 11.41 17.94 25.83 33.05 43.79 53.25 63.46 71.59 79.14 86.78 93.90 100.00

REALISASI BOBOT RENCANA

BOBOT CEPAT

BOBOT LAMBAT

Payakumbuh, 4 Mei 2010.

Penawar

CV. FANNELIN

JANGKA WAKTU PELAKSANAAN 90 ( SEMBILAN PULUH ) HARI KALENDER

Sisa Hari Yang Terpakai Pada Minggu Ke-13 adalah 6 ( Enam ) Hari Kalender

Page 30: Sopan Gadang Asli Penawaran

HENDRI UTAMA

Direktur

Page 31: Sopan Gadang Asli Penawaran

A N A L I S A T E K N I SKEGIATAN : REHAB SEDANG/ BERAT PUSKESMAS PEMBANTU

PEKERJAAN : PEMBANGUNAN POSKESRI SOPAN GADANG

LOKASI : MAEK KECAMATAN BUKIK BARISAN KABUPATEN LIMAPULUH KOTA

T. ANGGARAN : 2010.

A. BANGUNAN POSKESRII. PEKERJAAN PENDAHULUAN

1. Jenis Pekerjaan : Pemcersihan Lapangan

Volume Pekerjaan : 135.00 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Tenaga Kerja Pekerja OH 0.100 135.00 13.50 13.50 Org Mandor OH 0.050 135.00 6.75 6.75 Org

2. Jenis Pekerjaan : Pekerjaan Bowplank

Volume Pekerjaan : 48.00 M'Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Kayu 5/7 Klas III M3 0.012 48.00 0.58 0.58 M3Paku 2" - 5 " Kg 0.020 48.00 0.96 0.96 Kg Kayu papan Klas III M3 0.007 48.00 0.34 0.34 M3

Tenaga Kerja Pekerja OH 0.100 48.00 4.80 4.80 Org Tukang Kayu OH 0.100 48.00 4.80 4.80 Org Kepala Tukang OH 0.010 48.00 0.48 0.48 Org Mandor OH 0.0050 48.00 0.24 0.24 Org

II. PEKERJAAN PONDASI1. Jenis Pekerjaan : Galian Tanah

Volume Pekerjaan : 41.89 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Tenaga Kerja Pekerja OH 0.400 41.89 16.76 16.76 Org Mandor OH 0.040 41.89 1.68 1.68 Org

2 Jenis Pekerjaan : Pekerjaan Anstampang Batu Kali

Volume Pekerjaan : 11.76 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Batu Belah 15 / 20 cm M3 1.200 11.76 14.11 14.11 M3 Pasir Urug M3 0.300 11.76 3.53 3.53 M3

Tenaga Kerja Pekerja OH 0.780 11.76 9.17 9.17 OrgTukang Batu OH 0.390 11.76 4.59 4.59 OrgKepala Tukang OH 0.039 11.76 0.46 0.46 Org Mandor OH 0.039 11.76 0.46 0.46 Org

3. Jenis Pekerjaan : Pekerjaan Pondasi Batu Kali 1:4

Volume Pekerjaan : 24.99 M3Jangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Batu Belah 15 / 20 cm M3 1.100 24.99 27.49 13.74 M3

Page 32: Sopan Gadang Asli Penawaran

Semen ( PC ) Sak 3.260 24.99 81.47 40.73 Sak Pasir Pasang M3 0.520 24.99 12.99 6.50 M3

Tenaga Kerja Pekerja OH 1.500 24.99 37.49 18.74 Org Tukang Batu OH 0.600 24.99 14.99 7.50 Org Kepala Tukang OH 0.060 24.99 1.50 0.75 Org Mandor OH 0.075 24.99 1.87 0.94 Org

4. Jenis Pekerjaan : Urugan Kembali

Volume Pekerjaan : 14.70 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Tenaga Kerja Pekerja OH 0.192 14.70 2.82 2.82 Org Mandor OH 0.019 14.70 0.28 0.28 Org

III. PEKERJAAN BETON BERTULANG1. Jenis Pekerjaan : Pek. Sloof 15/20

Volume Pekerjaan : 2.21 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

No URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

BESI BETONA TENAGA

1 Pekerja Org/Hari 0.8825 2.21 1.95 1.95 Org2 Tukang Besi Org/Hari 0.8825 2.21 1.95 1.95 Org3 Kepala Tukang Org/Hari 0.0883 2.21 0.20 0.20 Org4 Mandor Org/Hari 0.0378 2.21 0.08 0.08 Org

B. BAHAN

1 Besi beton (polos/ulir) Kg 132.3778 2.21 292.55 292.55 Kg2 Kawat beton Kg 1.8911 2.21 4.18 4.18 Kg

BEKISTINGA TENAGA

1 Pekerja Org/Hari 2.0010 2.21 4.42 4.42 Org2 Tukang kayu Org/Hari 1.7342 2.21 3.83 3.83 Org3 Kepala tukang Org/Hari 0.1734 2.21 0.38 0.38 Org4 Mandor Org/Hari 0.0334 2.21 0.07 0.07 Org

B. BAHAN

1 Kayu Papan Kls III M3 0.3002 2.21 0.66 0.66 M32 Paku biasa 2" - 5" Kg 2.0010 2.21 4.42 4.42 Kg3 Minyak bekisting Lt 0.6670 2.21 1.47 1.47 Lt

BETON 1:2:3A TENAGA

1 Pekerja Org/Hari 2.0000 2.21 4.42 4.42 Org2 Tukang batu Org/Hari 0.3500 2.21 0.77 0.77 Org3 Kepala tukang Org/Hari 0.0350 2.21 0.08 0.08 Org4 Mandor Org/Hari 1.0000 2.21 2.21 2.21 Org

B. BAHAN

1 Semen portland (50 Kg) Zak 6.7200 2.21 14.85 14.85 Zak2 Pasir beton M3 0.5400 2.21 1.19 1.19 M33 Koral beton M3 0.8100 2.21 1.79 1.79 M3

2. Jenis Pekerjaan : Pek. Kolom Praktis 13/13Volume Pekerjaan : 1.46 M3Jangka Waktu Pelaksanaan : 3.00 Minggu

Page 33: Sopan Gadang Asli Penawaran

No URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

BESI BETONA TENAGA

1 Pekerja Org/Hari 1.3704 1.46 2.00 0.67 Org2 Tukang Besi Org/Hari 1.3704 1.46 2.00 0.67 Org3 Kepala Tukang Org/Hari 0.1370 1.46 0.20 0.07 Org4 Mandor Org/Hari 0.0587 1.46 0.09 0.03 Org

B. BAHAN

1 Besi beton (polos/ulir) Kg 205.5653 1.46 300.13 100.04 Kg2 Kawat beton Kg 2.9366 1.46 4.29 1.43 Kg

BEKISTINGA TENAGA

1 Pekerja Org/Hari 2.0010 1.46 2.92 0.97 Org2 Tukang kayu Org/Hari 1.7342 1.46 2.53 0.84 Org3 Kepala tukang Org/Hari 0.1734 1.46 0.25 0.08 Org4 Mandor Org/Hari 0.0334 1.46 0.05 0.02 Org

B. BAHAN

1 Kayu Papan Kls III M3 0.3002 1.46 0.44 0.15 M32 Paku biasa 2" - 5" Kg 2.0010 1.46 2.92 0.97 Kg3 Minyak bekisting Lt 0.6670 1.46 0.97 0.32 Lt

BETON 1:2:3A TENAGA

1 Pekerja Org/Hari 2.0000 1.46 2.92 0.97 Org2 Tukang batu Org/Hari 0.3500 1.46 0.51 0.17 Org3 Kepala tukang Org/Hari 0.0350 1.46 0.05 0.02 Org4 Mandor Org/Hari 1.0000 1.46 1.46 0.49 Org

B. BAHAN

1 Semen portland (50 Kg) Zak 6.7200 1.46 9.81 3.27 Zak2 Pasir beton M3 0.5400 1.46 0.79 0.26 M33 Koral beton M3 0.8100 1.46 1.18 0.39 M3

3. Jenis Pekerjaan : Pek. Balok 15/30 TerasVolume Pekerjaan : 0.21 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

No URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

BESI BETONA TENAGA

1 Pekerja Org/Hari 0.8539 0.21 0.18 0.18 Org2 Tukang Besi Org/Hari 0.8539 0.21 0.18 0.18 Org3 Kepala Tukang Org/Hari 0.0854 0.21 0.02 0.02 Org4 Mandor Org/Hari 0.0366 0.21 0.01 0.01 Org

B. BAHAN

1 Besi beton (polos/ulir) Kg 128.0803 0.21 26.90 26.90 Kg2 Kawat beton Kg 1.8297 0.21 0.38 0.38 Kg

BEKISTINGA TENAGA

1 Pekerja Org/Hari 2.0010 0.21 0.42 0.42 Org2 Tukang kayu Org/Hari 1.7342 0.21 0.36 0.36 Org3 Kepala tukang Org/Hari 0.1734 0.21 0.04 0.04 Org4 Mandor Org/Hari 0.0334 0.21 0.01 0.01 Org

B. BAHAN

1 Kayu Papan Kls III M3 0.3002 0.21 0.06 0.06 M32 Paku biasa 2" - 5" Kg 2.0010 0.21 0.42 0.42 Kg3 Minyak bekisting Lt 0.6670 0.21 0.14 0.14 Lt

Page 34: Sopan Gadang Asli Penawaran

BETON 1:2:3A TENAGA

1 Pekerja Org/Hari 2.0000 0.21 0.42 0.42 Org2 Tukang batu Org/Hari 0.3500 0.21 0.07 0.07 Org3 Kepala tukang Org/Hari 0.0350 0.21 0.01 0.01 Org4 Mandor Org/Hari 1.0000 0.21 0.21 0.21 Org

B. BAHAN

1 Semen portland (50 Kg) Zak 6.7200 0.21 1.41 1.41 Zak2 Pasir beton M3 0.5400 0.21 0.11 0.11 M33 Koral beton M3 0.8100 0.21 0.17 0.17 M3

4. Jenis Pekerjaan : Pek. Balok 13/13 Untuk Plat BetonVolume Pekerjaan : 0.03 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

No URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

BESI BETONA TENAGA

1 Pekerja Org/Hari 1.3704 0.03 0.04 0.04 Org2 Tukang Besi Org/Hari 1.3704 0.03 0.04 0.04 Org3 Kepala Tukang Org/Hari 0.1370 0.03 0.00 0.00 Org4 Mandor Org/Hari 0.0587 0.03 0.00 0.00 Org

B. BAHAN

1 Besi beton (polos/ulir) Kg 205.5653 0.03 6.17 6.17 Kg2 Kawat beton Kg 2.9366 0.03 0.09 0.09 Kg

BEKISTINGA TENAGA

1 Pekerja Org/Hari 2.0010 0.03 0.06 0.06 Org2 Tukang kayu Org/Hari 1.7342 0.03 0.05 0.05 Org3 Kepala tukang Org/Hari 0.1734 0.03 0.01 0.01 Org4 Mandor Org/Hari 0.0334 0.03 0.00 0.00 Org

B. BAHAN

1 Kayu Papan Kls III M3 0.3002 0.03 0.01 0.01 M32 Paku biasa 2" - 5" Kg 2.0010 0.03 0.06 0.06 Kg3 Minyak bekisting Lt 0.6670 0.03 0.02 0.02 Lt

BETON 1:2:3A TENAGA

1 Pekerja Org/Hari 2.0000 0.03 0.06 0.06 Org2 Tukang batu Org/Hari 0.3500 0.03 0.01 0.01 Org3 Kepala tukang Org/Hari 0.0350 0.03 0.00 0.00 Org4 Mandor Org/Hari 1.0000 0.03 0.03 0.03 Org

B. BAHAN

1 Semen portland (50 Kg) Zak 6.7200 0.03 0.20 0.20 Zak2 Pasir beton M3 0.5400 0.03 0.02 0.02 M33 Koral beton M3 0.8100 0.03 0.02 0.02 M3

5. Jenis Pekerjaan : Pek. Ring Balok 13/15Volume Pekerjaan : 1.43 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

No URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

BESI BETONA TENAGA

1 Pekerja Org/Hari 1.3011 1.43 1.86 1.86 Org2 Tukang Besi Org/Hari 1.3011 1.43 1.86 1.86 Org3 Kepala Tukang Org/Hari 0.1301 1.43 0.19 0.19 Org

Page 35: Sopan Gadang Asli Penawaran

4 Mandor Org/Hari 0.0558 1.43 0.08 0.08 OrgB. BAHAN

1 Besi beton (polos/ulir) Kg 195.1576 1.43 279.08 279.08 Kg2 Kawat beton Kg 2.7880 1.43 3.99 3.99 Kg

BEKISTINGA TENAGA

1 Pekerja Org/Hari 2.0010 1.43 2.86 2.86 Org2 Tukang kayu Org/Hari 1.7342 1.43 2.48 2.48 Org3 Kepala tukang Org/Hari 0.1734 1.43 0.25 0.25 Org4 Mandor Org/Hari 0.0334 1.43 0.05 0.05 Org

B. BAHAN

1 Kayu Papan Kls III M3 0.3002 1.43 0.43 0.43 M32 Paku biasa 2" - 5" Kg 2.0010 1.43 2.86 2.86 Kg3 Minyak bekisting Lt 0.6670 1.43 0.95 0.95 Lt

BETON 1:2:3A TENAGA

1 Pekerja Org/Hari 2.0000 1.43 2.86 2.86 Org2 Tukang batu Org/Hari 0.3500 1.43 0.50 0.50 Org3 Kepala tukang Org/Hari 0.0350 1.43 0.05 0.05 Org4 Mandor Org/Hari 1.0000 1.43 1.43 1.43 Org

B. BAHAN

1 Semen portland (50 Kg) Zak 6.7200 1.43 9.61 9.61 Zak2 Pasir beton M3 0.5400 1.43 0.77 0.77 M33 Koral beton M3 0.8100 1.43 1.16 1.16 M3

6. Jenis Pekerjaan : Pek. Plat Beton tebal 7 cm Volume Pekerjaan : 0.09 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

No URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

1 Besi Kg 103.333 0.09 9.30 9.30 Kg2 Bekisting M2 9.3330 0.09 0.84 0.84 M23 Stamp Beton 1:2:3 M3 1.0000 0.09 0.09 0.09 M34 Kayu / Papan Klas IV M3 0.4000 0.09 0.04 0.04 M35 Triplek t = 6 mm Lbr 8.0000 0.09 0.72 0.72 Lbr6 Paku Kg 4.0000 0.09 0.36 0.36 Kg7 Pekerja Oh 0.2000 0.09 0.02 0.02 Org8 Tukang Kayu Oh 0.500 0.09 0.05 0.05 Org9 Kepala Tukang Kayu Oh 0.050 0.09 0.00 0.01 Org

10 Mandor Oh 0.010 0.09 0.00 0.00 Org

7. Jenis Pekerjaan : Pek. Plat Beton tebal 7 cm Untuk Meja DapurVolume Pekerjaan : 0.08 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

No URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

1 Besi Kg 103.333 0.08 8.27 8.27 Kg2 Bekisting M2 9.3330 0.08 0.75 0.75 M2

Page 36: Sopan Gadang Asli Penawaran

3 Stamp Beton 1:2:3 M3 1.0000 0.08 0.08 0.08 M34 Kayu / Papan Klas IV M3 0.4000 0.08 0.03 0.03 M35 Triplek t = 6 mm Lbr 8.0000 0.08 0.64 0.64 Lbr6 Paku Kg 4.0000 0.08 0.32 0.32 Kg7 Pekerja Oh 0.2000 0.08 0.02 0.02 Org8 Tukang Kayu Oh 0.500 0.08 0.04 0.04 Org9 Kepala Tukang Kayu Oh 0.050 0.08 0.00 0.01 Org

10 Mandor Oh 0.010 0.08 0.00 0.00 Org

IV. PEKERJAAN DINDING1. Jenis Pekerjaan : Pasangan Dinding Bata 1:2

Volume Pekerjaan : 18.36 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Batu Bata Bh 70.000 18.36 1,285.20 1,285.20 Bh Semen portland Sak 0.379 18.36 6.96 6.96 Sak Pasir pasangan M3 0.038 18.36 0.70 0.70 M3

Tenaga Kerja Batu Bata OH 0.320 18.36 5.88 5.88 Org Semen portland OH 0.100 18.36 1.84 1.84 Org Pasir pasangan OH 0.010 18.36 0.18 0.18 Org Mandor OH 0.015 18.36 0.28 0.28 Org

2. Jenis Pekerjaan : Pasangan Dinding Bata 1:4

Volume Pekerjaan : 193.49 M2Jangka Waktu Pelaksanaan : 3.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Batu Bata Bh 70.000 193.49 13,544.30 4,514.77 Bh Semen portland Sak 0.230 193.49 44.50 14.83 Sak Pasir pasangan M3 0.043 193.49 8.32 2.77 M3

Tenaga Kerja Batu Bata OH 0.320 193.49 61.92 20.64 Org Semen portland OH 0.100 193.49 19.35 6.45 Org Pasir pasangan OH 0.010 193.49 1.93 0.64 Org Mandor OH 0.015 193.49 2.90 0.97 Org

3. Jenis Pekerjaan : Pasangan Batu Alam

Volume Pekerjaan : 9.45 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Pasir Pasang M3 0.010 9.45 0.09 0.09 M3Semen Zak 0.147 9.45 1.39 1.39 ZakBatu Alam M2 1.000 9.45 9.45 9.45 M2

Tenaga Kerja Pekerja OH 0.500 9.45 4.73 4.73 OrgMandor OH 0.050 9.45 0.47 0.47 OrgTukang Batu OH 0.500 9.45 4.73 4.73 OrgKep. Tukang Batu OH 0.050 9.45 0.47 0.47 Org

4. Jenis Pekerjaan : Pekerjaan Kusen

Page 37: Sopan Gadang Asli Penawaran

Volume Pekerjaan : 1.45 M3Jangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Papan Kayu Kls II m3 1.200 1.45 1.74 0.87 m3 Tenaga Kerja Pekerja OH 6.000 1.45 8.70 4.35 Org

Tukang Kayu OH 18.000 1.45 26.10 13.05 Org Kepala tukang OH 2.000 1.45 2.90 1.45 Org Mandor OH 0.300 1.45 0.44 0.22 Org

5. Jenis Pekerjaan : Memenie Kusen Yang menyentuh Pasangan

Volume Pekerjaan : 22.53 M2Jangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Menie Kg 0.120 22.53 2.70 1.35 Kg Tenaga Kerja Pekerja OH 0.067 22.53 1.51 0.75 Org

Tukang Kayu OH 0.100 22.53 2.25 1.13 Org Kepala tukang OH 0.010 22.53 0.23 0.11 Org Mandor OH 0.003 22.53 0.07 0.03 Org

6 Jenis Pekerjaan : Pas. Keramik Dinding 20/25 WC

Volume Pekerjaan : 12.12 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Keramik 20 x 25 cm m2 1.000 12.12 12.12 12.12 m2 Semen Sak 0.186 12.12 2.25 2.25 Sak Pasir Pasang m3 0.018 12.12 0.22 0.22 m3 Semen Warna kg 1.500 12.12 18.18 18.18 kg

Tenaga Kerja Pekerja OH 0.600 12.12 7.27 7.27 Org Tukang batu OH 0.450 12.12 5.45 5.45 Org Kepala tukang OH 0.045 12.12 0.55 0.55 Org Mandor OH 0.030 12.12 0.36 0.36 Org

7. Jenis Pekerjaan : Pasangan Les Keramik

Volume Pekerjaan : 11.20 M'Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Plint keramik artistik 8 x 20 c Bh 5.000 11.20 56.00 56.00 Bh Semen portland ( 50 Kg) Zak 0.033 11.20 0.37 0.37 Zak Pasir pasang M3 0.003 11.20 0.04 0.04 M3 Semen warna Kg 0.100 11.20 1.12 1.12 Kg

Tenaga Kerja Pekerja OH 0.090 11.20 1.01 1.01 Org Tukang batu OH 0.090 11.20 1.01 1.01 Org Kepala tukang OH 0.009 11.20 0.10 0.10 Org Mandor OH 0.005 11.20 0.05 0.05 Org

V. PEKERJAAN ATAP1. Jenis Pekerjaan : Pekerjaan Kuda-Kuda

Volume Pekerjaan : 2.43 M3Jangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Page 38: Sopan Gadang Asli Penawaran

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Kayu Klas II M3 1.100 2.43 2.67 1.34 M3 Besi strip Kg 15.000 2.43 36.45 18.23 Kg Paku biasa 2" - 5" Kg 5.600 2.43 13.61 6.80 Kg

Tenaga Kerja Pekerja OH 4.000 2.43 9.72 4.86 Org Tukang Kayu OH 12.000 2.43 29.16 14.58 Org Kepala Tukang OH 1.2000 2.43 2.92 1.46 Org Mandor OH 0.2000 2.43 0.49 0.24 Org

2. Jenis Pekerjaan : Pekerjaan Gording

Volume Pekerjaan : 1.58 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Kayu Klas II M3 1.100 1.58 1.74 1.74 M3 Besi strip Kg 15.000 1.58 23.70 23.70 Kg Paku biasa 2" - 5" Kg 3.000 1.58 4.74 4.74 Kg

Tenaga Kerja Pekerja OH 2.400 1.58 3.79 3.79 Org Tukang Kayu OH 7.200 1.58 11.38 11.38 Org Kepala Tukang OH 0.7200 1.58 1.14 1.14 Org Mandor OH 0.1200 1.58 0.19 0.19 Org

3. Jenis Pekerjaan : Pekerjaan Residu

Volume Pekerjaan : 128.30 M'Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Residu ltr 0.350 128.30 44.91 44.91 ltr Tenaga Kerja Pekerja OH 0.100 128.30 12.83 12.83 Org

Mandor OH 0.006 128.30 0.77 0.77 Org

4. Jenis Pekerjaan : Pasangan Lesplank Double Dirotter

Volume Pekerjaan : 11.88 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Papan kayu kls II m3 0.015 11.88 0.17 0.17 m3 Paku 5 cm dan 7 cm KG 0.060 11.88 0.71 0.71 KG

Tenaga Kerja Pekerja OH 0.150 11.88 1.78 0.15 Org Tukang kayu OH 0.250 11.88 2.97 0.25 Org Kepala Tukang OH 0.025 11.88 0.30 0.03 Org Mandor OH 0.075 11.88 0.89 0.08 Org

5. Jenis Pekerjaan : Pasangan Atap Seng Warna

Volume Pekerjaan : 134.77 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Seng Gelombang Warna lbr 0.700 134.77 94.34 94.34 lbrPaku atap kg 0.020 134.77 2.70 2.70 kg

Tenaga Kerja Pekerja OH 0.120 134.77 16.17 16.17 Org Tukang Kayu OH 0.060 134.77 8.09 8.09 Org Kepala Tukang OH 0.0060 134.77 0.81 0.81 Org Mandor OH 0.0060 134.77 0.81 0.81 Org

Page 39: Sopan Gadang Asli Penawaran

6. Jenis Pekerjaan : Pasangan Perabung Atap Seng Warna

Volume Pekerjaan : 12.63 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Seng plat BJLS 30 bh 0.300 12.63 3.79 3.79 bhPaku atap kg 0.0400 12.63 0.51 0.51 kg

Tenaga Kerja Pekerja OH 0.150 12.63 1.89 0.150 Org Tukang Kayu OH 0.070 12.63 0.88 0.884 Org Kepala Tukang OH 0.0080 12.63 0.101 0.101 Org Mandor OH 0.0060 12.63 0.076 0.076 Org

VI. PEKERJAAN PLESTERAN1. Jenis Pekerjaan : Pekerjaan Plesteran 1:2

Volume Pekerjaan : 36.72 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Semen portland (50 Kg) Sak 0.170 36.72 6.24 6.24 Sak Pasir pasangan m3 0.017 36.72 0.62 0.62 m3

Tenaga Kerja Pekerja OH 0.200 36.72 7.34 7.34 Org Tukang batu OH 0.150 36.72 5.51 5.51 Org Kepala tukang OH 0.015 36.72 0.55 0.55 Org Mandor OH 0.010 36.72 0.37 0.37 Org

2. Jenis Pekerjaan : Pekerjaan Plesteran 1:4

Volume Pekerjaan : 409.02 M2Jangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Semen ( PC ) Sak 0.104 409.02 42.54 21.27 Sak Pasir Pasang m3 0.020 409.02 8.18 4.09 m3

Tenaga Kerja Pekerja OH 0.200 409.02 81.80 40.90 Org Tukang Batu OH 0.150 409.02 61.35 30.68 Org Kepala Tukang OH 0.015 409.02 6.14 3.07 Org Mandor OH 0.010 409.02 4.09 2.05 Org

3. Jenis Pekerjaan : Afwerking Beton

Volume Pekerjaan : 3.25 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Semen ( PC ) Sak 0.258 3.25 0.84 0.84 Sak Pasir Pasang m3 0.013 3.25 0.04 0.04 m3

Tenaga Kerja Pekerja OH 0.200 3.25 0.65 0.65 Org Tukang Batu OH 0.150 3.25 0.49 0.49 Org Kepala Tukang OH 0.015 3.25 0.05 0.05 Org Mandor OH 0.010 3.25 0.03 0.03 Org

VII. PEKERJAAN PLAFON1. Jenis Pekerjaan : Pekerjaan Rangka Plafon

Volume Pekerjaan : 115.05 M2Jangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Page 40: Sopan Gadang Asli Penawaran

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Papan kayu kls II m3 0.023 115.05 2.65 1.32 m3 Paku biasa 2"- 5" Kg 0.150 115.05 17.26 8.63 Kg

Tenaga Kerja Pekerja OH 0.200 115.05 23.01 11.51 Org Tukang kayu OH 0.300 115.05 34.52 17.26 Org Kepala Tukang OH 0.030 115.05 3.45 1.73 Org Mandor OH 0.010 115.05 1.15 0.58 Org

2. Jenis Pekerjaan : Pasangan Plafon triplek

Volume Pekerjaan : 69.05 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Triplek 4 mm lbr 0.375 69.05 25.89 25.89 lbr Paku triplek OH 0.030 69.05 2.07 2.07 OH

Tenaga Kerja Pekerja OH 0.070 69.05 4.83 4.83 Org Tukang kayu OH 0.100 69.05 6.91 6.91 Org Kepala Tukang OH 0.010 69.05 0.69 0.69 Org Mandor OH 0.004 69.05 0.24 0.24 Org

3. Jenis Pekerjaan : Pasangan Plafon Lumbresering

Volume Pekerjaan : 46.00 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Lambersering lbr 3.300 46.00 151.80 151.80 lbrBesi Paku 1" OH 0.200 46.00 9.20 9.20 OH

Tenaga Kerja Pekerja OH 0.280 46.00 12.88 12.88 OrgTukang Kayu OH 0.200 46.00 9.20 9.20 OrgKepala Tukang Kayu OH 0.020 46.00 0.92 0.92 OrgMandor OH 0.014 46.00 0.64 0.64 Org

4. Jenis Pekerjaan : List Profil

Volume Pekerjaan : 144.10 M'Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan List kayu profil 3,5 x 3,5 cm m' 1.050 144.10 151.31 151.31 m' Paku kg 0.021 144.10 3.03 3.03 kg

Tenaga Kerja Pekerja OH 0.021 144.10 3.03 3.03 Org Tukang kayu OH 0.021 144.10 3.03 3.03 Org Kepala Tukang OH 0.002 144.10 0.29 0.29 Org Mandor OH 0.001 144.10 0.14 0.14 Org

VIII. PEKERJAAN LANTAI1. Jenis Pekerjaan : Urugan Tanah Bawah Lantai

Volume Pekerjaan : 7.14 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Tanah Timbun m3 1.200 7.14 8.57 8.57 m3 Tenaga Kerja Pekerja OH 0.250 7.14 1.79 1.79 OH

Mandor OH 0.025 7.14 0.18 0.18 OH

2. Jenis Pekerjaan : Urugan Pasir Bawah Lantai

Page 41: Sopan Gadang Asli Penawaran

Volume Pekerjaan : 7.14 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Pasir Urug m3 1.200 7.14 8.57 8.57 m3 Tenaga Kerja Pekerja OH 0.250 7.14 1.79 1.79 OH

Mandor OH 0.025 7.14 0.18 0.18 OH

3. Jenis Pekerjaan : Pekerjaan Beton tumbuk 1:3:5

Volume Pekerjaan : 5.30 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Semen ( PC ) Zak 6.800 5.30 36.04 36.04 Zak Pasir Pasang m3 0.540 5.30 2.86 2.86 m3 Kerikil Beton m3 0.810 5.30 4.29 4.29 m3

Tenaga Kerja Pekerja OH 2.000 5.30 10.60 10.60 Org Tukang Batu OH 0.350 5.30 1.85 1.85 Org Kepala Tukang OH 0.035 5.30 0.186 0.186 Org Mandor OH 1.000 5.30 5.30 5.30 Org

4. Jenis Pekerjaan : Pas. Lantai Keramik 30x30

Volume Pekerjaan : 65.40 M2Jangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Keramik 30 x 30 cm m2 1.000 65.40 65.40 32.70 m2 Semen Sak 0.200 65.40 13.08 6.54 Sak Pasir Pasang m3 0.045 65.40 2.94 1.47 m3 Semen Warna kg 1.500 65.40 98.10 49.05 kg

Tenaga Kerja Pekerja OH 0.260 65.40 17.00 8.50 Org Tukang batu OH 0.130 65.40 8.50 4.251 Org Kepala tukang OH 0.013 65.40 0.85 0.43 Org Mandor OH 0.013 65.40 0.85 0.43 Org

5. Jenis Pekerjaan : Pas. Lantai Keramik 30/30 Anti Slip

Volume Pekerjaan : 10.73 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Keramik 30 x 30 cm m2 1.000 10.73 10.73 10.73 m2 Semen Sak 0.200 10.73 2.15 2.15 Sak Pasir Pasang m3 0.045 10.73 0.48 0.48 m3 Semen Warna kg 1.500 10.73 16.10 16.10 kg

Tenaga Kerja Pekerja OH 0.260 10.73 2.79 2.79 Org Tukang batu OH 0.130 10.73 1.39 1.395 Org Kepala tukang OH 0.013 10.73 0.14 0.14 Org Mandor OH 0.013 10.73 0.14 0.14 Org

6. Jenis Pekerjaan : Pas. Lantai Keramik 20/20 Anti Slip

Volume Pekerjaan : 6.42 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Keramik 20 x 20 cm m2 1.000 6.42 6.42 6.42 m2 Semen Sak 0.208 6.42 1.34 1.34 Sak Pasir Pasang m3 0.045 6.42 0.29 0.29 m3 Semen Warna kg 1.620 6.42 10.40 10.40 kg

Tenaga Kerja Pekerja OH 0.270 6.42 1.73 1.73 Org

Page 42: Sopan Gadang Asli Penawaran

Tukang batu OH 0.135 6.42 0.87 0.867 Org Kepala tukang OH 0.014 6.42 0.09 0.09 Org Mandor OH 0.014 6.42 0.09 0.09 Org

7. Jenis Pekerjaan : Pas. Lantai Keramik 20/20 Meja Dapur

Volume Pekerjaan : 0.90 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Keramik 20 x 20 cm m2 1.000 0.90 0.90 0.90 m2 Semen Sak 0.208 0.90 0.19 0.19 Sak Pasir Pasang m3 0.045 0.90 0.04 0.04 m3 Semen Warna kg 1.620 0.90 1.46 1.46 kg

Tenaga Kerja Pekerja OH 0.270 0.90 0.24 0.24 Org Tukang batu OH 0.135 0.90 0.12 0.122 Org Kepala tukang OH 0.014 0.90 0.01 0.01 Org Mandor OH 0.014 0.90 0.01 0.01 Org

IX. PEKERJAAN PINTU & JENDELAA. Pekerjaan Pintu Dan Jendela

1. Jenis Pekerjaan : Pasangan Pintu Panil

Volume Pekerjaan : 15.29 M2Jangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Kayu Papan Klas I m3 0.040 15.29 0.61 0.31 m3 Paku biasa 2" - 5" kg 0.050 15.29 0.76 0.38 kg

Tenaga Kerja Pekerja OH 1.000 15.29 15.29 7.65 Org Tukang kayu OH 2.500 15.29 38.22 19.11 Org Kepala tukang OH 0.2500 15.29 3.82 1.91 Org Mandor OH 0.0500 15.29 0.76 0.38 Org

2. Jenis Pekerjaan : Pasangan Daun jendela Rangka Kaca 5 mm

Volume Pekerjaan : 15.60 M2Jangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Kayu Papan Klas I m3 0.014 15.60 0.22 0.11 m3Kaca Warna 3 mm m2 1.000 15.60 15.60 7.80 m2

Tenaga Kerja Pekerja OH 0.800 15.60 12.48 6.24 Org Tukang kayu OH 2.000 15.60 31.20 15.60 Org Kepala tukang OH 0.2000 15.60 3.12 1.56 Org Mandor OH 0.0400 15.60 0.62 0.31 Org

3. Jenis Pekerjaan : Pasangan Jalusi Ventilasi

Volume Pekerjaan : 3.36 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Kayu/ Papan Klas II m3 0.060 3.36 0.20 0.20 m3 Paku biasa 1/2" - 1" kg 0.150 3.36 0.50 0.50 kg

Tenaga Kerja Pekerja OH 0.500 3.36 1.68 1.68 Org Tukang kayu OH 2.000 3.36 6.72 6.72 Org Kepala tukang OH 0.2000 3.36 0.67 0.67 Org Mandor OH 0.0250 3.36 0.08 0.08 Org

B. Penggantung/ Pengunci1. Jenis Pekerjaan : Pasangan Kunci Pintu Tanam

Volume Pekerjaan : 9.00 Bh

Page 43: Sopan Gadang Asli Penawaran

Jangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Kunci Sillinder bh 1.000 9.00 9.00 4.50 bh

Tenaga Kerja Pekerja OH 0.005 9.00 0.05 0.02 Org Tukang Kayu OH 0.500 9.00 4.50 2.25 Org Kep. Tukang OH 0.005 9.00 0.05 0.02 Org Mandor OH 0.00025 9.00 0.00 0.00 Org

2. Jenis Pekerjaan : Pasangan Engsel Pintu

Volume Pekerjaan : 27.00 BhJangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Engsel Pintu bh 1.000 27.00 27.00 13.50 bh

Tenaga Kerja Pekerja OH 0.015 27.00 0.40 0.20 Org Tukang Kayu OH 0.150 27.00 4.05 2.03 Org Kep. Tukang OH 0.015 27.00 0.40 0.20 Org Mandor OH 0.00075 27.00 0.02 0.01 Org

3. Jenis Pekerjaan : Pasangan Gerendel Pintu

Volume Pekerjaan : 8.00 BhJangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Engsel Pintu bh 1.000 8.00 8.00 8.00 bh

Tenaga Kerja Pekerja OH 0.015 8.00 0.12 0.12 Org Tukang Kayu OH 0.150 8.00 1.20 1.20 Org Kep. Tukang OH 0.015 8.00 0.12 0.12 Org Mandor OH 0.00075 8.00 0.01 0.01 Org

4. Jenis Pekerjaan : Pasangan Engsel Jendela

Volume Pekerjaan : 40.00 BhJangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Engsel Jendela bh 1.000 40.00 40.00 20.00 bh

Tenaga Kerja Pekerja OH 0.015 40.00 0.60 0.30 Org Tukang Kayu OH 0.150 40.00 6.00 3.00 Org Kep. Tukang OH 0.015 40.00 0.60 0.30 Org Mandor OH 0.00075 40.00 0.03 0.02 Org

5. Jenis Pekerjaan : Pasangan Gerendel Jendela

Volume Pekerjaan : 40.00 BhJangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Gerendel jendela bh 1.000 40.00 40.00 20.00 bh

Tenaga Kerja Pekerja OH 0.015 40.00 0.60 0.30 Org

Page 44: Sopan Gadang Asli Penawaran

Tukang Kayu OH 0.150 40.00 6.00 3.00 Org Kep. Tukang OH 0.015 40.00 0.60 0.30 Org Mandor OH 0.00075 40.00 0.03 0.02 Org

6. Jenis Pekerjaan : Pasangan Kait angin

Volume Pekerjaan : 40.00 BhJangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Kait angin bh 1.000 40.00 40.00 20.00 bh

Tenaga Kerja Pekerja OH 0.015 40.00 0.60 0.30 Org Tukang Kayu OH 0.150 40.00 6.00 3.00 Org Kep. Tukang OH 0.015 40.00 0.60 0.30 Org Mandor OH 0.00075 40.00 0.03 0.02 Org

7. Jenis Pekerjaan : Pasangan Hand Vatten

Volume Pekerjaan : 20.00 BhJangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Hand Vatten bh 1.000 20.00 20.00 10.00 bh

Tenaga Kerja Pekerja OH 0.015 20.00 0.30 0.15 Org Tukang Kayu OH 0.150 20.00 3.00 1.50 Org Kep. Tukang OH 0.015 20.00 0.30 0.15 Org Mandor OH 0.00075 20.00 0.02 0.01 Org

X. PEKERJAAN PENGECATAN1. Jenis Pekerjaan : Pek. Cat Dinding + Plat Dengan Cat Air

Volume Pekerjaan : 445.74 M2Jangka Waktu Pelaksanaan : 3.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Plamir Kg 0.100 445.74 44.57 14.86 Kg Cat dasar Kg 0.100 445.74 44.57 14.86 KgCat Tembok Kg 0.260 445.74 115.89 38.63 Kg

Tenaga Kerja Pekerja Oh 0.020 445.74 8.91 2.97 Org Tukang cat Oh 0.063 445.74 28.08 9.36 Org Kepala tukang Oh 0.006 445.74 2.81 0.94 Org Mandor Oh 0.0025 445.74 1.11 0.37 Org

2. Jenis Pekerjaan : Pek. Cat Plafon Triplek Dengan Cat Air

Volume Pekerjaan : 69.05 M2Jangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Plamir Kg 0.100 69.05 6.91 3.45 Kg Cat dasar Kg 0.100 69.05 6.91 3.45 KgCat Tembok Kg 0.260 69.05 17.95 8.98 Kg

Tenaga Kerja Pekerja Oh 0.020 69.05 1.38 0.69 Org Tukang cat Oh 0.063 69.05 4.35 2.18 Org Kepala tukang Oh 0.006 69.05 0.44 0.22 Org

Page 45: Sopan Gadang Asli Penawaran

Mandor Oh 0.0025 69.05 0.17 0.09 Org

3. Jenis Pekerjaan : Cat kayu Yang kelihatan Dengan Cat Minyak

Volume Pekerjaan : 142.66 M2Jangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Cat meni Kg 0.200 142.66 28.53 14.27 Kg Plamir Kg 0.150 142.66 21.40 10.70 Kg Cat dasar Kg 0.170 142.66 24.25 12.13 KgCat minyak Kg 0.260 142.66 37.09 18.55 Kg

Tenaga Kerja Pekerja Oh 0.070 142.66 9.99 4.99 Org Tukang cat Oh 0.009 142.66 1.28 0.64 Org Kepala tukang Oh 0.006 142.66 0.86 0.43 Org Mandor Oh 0.003 142.66 0.36 0.18 Org

4. Jenis Pekerjaan : Cat Plafon Lunbresering Dengan Cat Impra

Volume Pekerjaan : 46.00 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Cat dasar ( Wood Stain ) Kg 0.500 46.00 23.00 23.00 KgMelamin Sending ( Lack ) Kg 0.250 46.00 11.50 11.50 KgMelamin Clear Kg 0.250 46.00 11.50 11.50 KgTinner Ltr 0.200 46.00 9.20 9.20 LtrWood Filler (Dempul Impra) Kg 0.100 46.00 4.60 4.60 KgAmplas Lbr 2.000 46.00 92.00 92.00 LbrTukang Cat Oh 0.009 46.00 0.41 0.41 Org

Tenaga Kerja Kepala Tukang Cat Oh 0.006 46.00 0.28 0.28 Org

5. Jenis Pekerjaan : Cat Batu Alam Denga Bitasol

Volume Pekerjaan : 10.50 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Cat meni Kg 0.200 10.50 2.10 2.10 Kg Plamir Kg 0.150 10.50 1.58 1.58 Kg Cat dasar Kg 0.170 10.50 1.79 1.79 KgCat minyak Kg 0.260 10.50 2.73 2.73 Kg

Tenaga Kerja Pekerja Oh 0.070 10.50 0.74 0.74 Org Tukang cat Oh 0.009 10.50 0.09 0.09 Org Kepala tukang Oh 0.006 10.50 0.06 0.06 Org Mandor Oh 0.003 10.50 0.03 0.03 Org

XI. PEKERJAAN PERLENGKAPAN DALAMA. KM/ WC/ DAPUR

1. Jenis Pekerjaan : Pasangan Kloset Jongkok

Volume Pekerjaan : 2.00 UnitJangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Klosed jongkok porselen bh 1.000 2.00 2.00 2.00 bhSemen portland (50 Kg) zak 0.120 2.00 0.24 0.24 zakPasir pasang m3 0.010 2.00 0.02 0.02 m3

Tenaga Kerja Pekerja OH 0.100 2.00 0.20 0.20 OrgTukang batu OH 1.500 2.00 3.00 3.00 OrgKepala tukang OH 1.500 2.00 3.00 3.00 Org Mandor OH 0.160 2.00 0.32 0.32 Org

2. Jenis Pekerjaan : Pasangan Bak Fiber Glass

Page 46: Sopan Gadang Asli Penawaran

Volume Pekerjaan : 2.00 BhJangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Bak Fiber glass bh 1.000 2.00 2.00 2.00 bh Tenaga Kerja Pekerja OH 1.800 2.00 3.60 3.60 Org

Tukang batu OH 2.700 2.00 5.40 5.40 Org Kepala tukang OH 0.540 2.00 1.08 1.08 Org Mandor OH 0.110 2.00 0.22 0.22 Org

3. Jenis Pekerjaan : Pasangan kran Air 3/4"

Volume Pekerjaan : 2.00 BhJangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Kran 1/2" bh 1.000 2.00 2.00 2.00 bh Seal Tape bh 0.025 2.00 0.05 0.05 bh

Tenaga Kerja Pekerja OH 0.010 2.00 0.02 0.02 OH Tukang Batu OH 0.100 2.00 0.20 0.20 OH Kep. Tukang OH 0.010 2.00 0.02 0.02 Org Mandor OH 0.005 2.00 0.01 0.01 Org

4. Jenis Pekerjaan : Pasangan Floor Drain

Volume Pekerjaan : 2.00 BhJangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Floor Drain Bh 1.000 2.00 2.00 2.00 Bh Tenaga Kerja Pekerja OH 0.010 2.00 0.02 0.02 Org

Tukang Batu OH 0.100 2.00 0.20 0.20 Org Kep. Tukang OH 0.010 2.00 0.02 0.02 Org Mandor OH 0.005 2.00 0.01 0.01 Org

5. Jenis Pekerjaan : Pas. Bak Cuci Piring stainless

Volume Pekerjaan : 1.00 BhJangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Bak cuci stainles steel Bh 1.000 1.00 1.00 1.00 Bh Tenaga Kerja Pekerja OH 0.010 1.00 0.01 0.01 Org

Tukang batu OH 0.100 1.00 0.10 0.10 Org Kepala tukang OH 0.010 1.00 0.01 0.01 Org Mandor OH 0.005 1.00 0.01 0.01 Org

B. SANITASI1. Jenis Pekerjaan : Pasangan Pipa GIP 3/4"

Volume Pekerjaan : 17.80 M'Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Pipa GIP 3/4" m 1.200 17.80 21.36 21.36 mPerlengkapan pkt 0.035 17.80 17.80 17.80 pkt

Tenaga Kerja Pekerja OH 0.054 17.80 0.96 0.96 OHTukang batu OH 0.090 17.80 1.60 1.60 OHKepala tukang OH 0.009 17.80 0.16 0.16 Org Mandor OH 0.02700 17.80 0.48 0.48 Org

Page 47: Sopan Gadang Asli Penawaran

2. Jenis Pekerjaan : Pasangan Pipa 3" PVC

Volume Pekerjaan : 17.25 M'Jangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Pipa Pvc m 1.200 17.25 20.70 10.35 m Perlengkapan pkt 0.035 17.25 17.25 8.63 pkt

Tenaga Kerja Pekerja OH 0.081 17.25 1.40 0.70 OH Tukang Batu OH 0.135 17.25 2.33 1.16 OH Kep. Tukang OH 0.014 17.25 0.23 0.12 Org Mandor OH 0.00410 17.25 0.07 0.04 Org

3. Jenis Pekerjaan : Pasangan Pipa 4" PVC

Volume Pekerjaan : 16.35 M'Jangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Pipa Pvc m 1.200 16.35 19.62 9.81 m Perlengkapan pkt 0.035 16.35 16.35 8.18 pkt

Tenaga Kerja Pekerja OH 0.081 16.35 1.32 0.66 OH Tukang Batu OH 0.135 16.35 2.21 1.10 OH Kep. Tukang OH 0.014 16.35 0.22 0.11 Org Mandor OH 0.00410 16.35 0.07 0.03 Org

XII. PEKERJAAN PERLENGKAPAN LUARA. PIRING-PIRING

1. Jenis Pekerjaan : Galian Tanah

Volume Pekerjaan : 1.38 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Tenaga Kerja Pekerja OH 0.400 1.38 0.55 0.55 Org Mandor OH 0.040 1.38 0.06 0.06 Org

2. Jenis Pekerjaan : Pasangan Dinding Bata 1:4

Volume Pekerjaan : 18.40 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Batu Bata Bh 70.000 18.40 1,288.00 1,288.00 Bh Semen portland Sak 0.230 18.40 4.23 4.23 Sak Pasir pasangan M3 0.043 18.40 0.79 0.79 M3

Tenaga Kerja Batu Bata OH 0.320 18.40 5.89 5.89 Org Semen portland OH 0.100 18.40 1.84 1.84 Org Pasir pasangan OH 0.010 18.40 0.18 0.18 Org Mandor OH 0.015 18.40 0.28 0.28 Org

3. Jenis Pekerjaan : Urugan Pasir Bawah Lantai

Volume Pekerjaan : 3.42 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Page 48: Sopan Gadang Asli Penawaran

Bahan Pasir Urug m3 1.200 3.42 4.10 4.10 m3 Tenaga Kerja Pekerja OH 0.250 3.42 0.86 0.86 OH

Mandor OH 0.025 3.42 0.09 0.09 OH

3. Jenis Pekerjaan : Pekerjaan Beton tumbuk 1:3:5 Ditaring Licin

Volume Pekerjaan : 3.42 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Semen ( PC ) Zak 6.800 3.42 23.26 23.26 Zak Pasir Pasang m3 0.540 3.42 1.85 1.85 m3 Kerikil Beton m3 0.810 3.42 2.77 2.77 m3

Tenaga Kerja Pekerja OH 2.000 3.42 6.84 6.84 Org Tukang Batu OH 0.350 3.42 1.20 1.20 Org Kepala Tukang OH 0.035 3.42 0.120 0.120 Org Mandor OH 1.000 3.42 3.42 3.42 Org

4. Jenis Pekerjaan : Pekerjaan Plesteran 1:4

Volume Pekerjaan : 9.20 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Semen ( PC ) Sak 0.104 9.20 0.96 0.96 Sak Pasir Pasang m3 0.020 9.20 0.18 0.18 m3

Tenaga Kerja Pekerja OH 0.200 9.20 1.84 1.84 Org Tukang Batu OH 0.150 9.20 1.38 1.38 Org Kepala Tukang OH 0.015 9.20 0.14 0.14 Org Mandor OH 0.010 9.20 0.09 0.09 Org

B. SEPTIKTANK1. Jenis Pekerjaan : Galian Tanah

Volume Pekerjaan : 10.39 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Tenaga Kerja Pekerja OH 0.400 10.39 4.16 4.16 Org Mandor OH 0.040 10.39 0.42 0.42 Org

2. Jenis Pekerjaan : Urugan Kembali

Volume Pekerjaan : 2.60 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Tenaga Kerja Pekerja OH 0.192 2.60 0.50 0.50 Org Mandor OH 0.019 2.60 0.05 0.05 Org

3. Jenis Pekerjaan : Pasangan 1 Bata 1:2

Volume Pekerjaan : 10.00 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Batu Bata Bh 140.000 10.00 1,400.00 1,400.00 Bh Semen portland Sak 0.870 10.00 8.70 8.70 Sak Pasir pasangan M3 0.080 10.00 0.80 0.80 M3

Tenaga Kerja Batu Bata OH 0.650 10.00 6.50 6.50 Org Semen portland OH 0.200 10.00 2.00 2.00 Org Pasir pasangan OH 0.020 10.00 0.20 0.20 Org Mandor OH 0.030 10.00 0.30 0.30 Org

4. Jenis Pekerjaan : Pasangan Dinding 1/2 Bata 1:2

Page 49: Sopan Gadang Asli Penawaran

Volume Pekerjaan : 2.28 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Batu Bata Bh 70.000 2.28 159.60 159.60 Bh Semen portland Sak 0.379 2.28 0.86 0.86 Sak Pasir pasangan M3 0.038 2.28 0.09 0.09 M3

Tenaga Kerja Batu Bata OH 0.320 2.28 0.73 0.73 Org Semen portland OH 0.100 2.28 0.23 0.23 Org Pasir pasangan OH 0.010 2.28 0.02 0.02 Org Mandor OH 0.015 2.28 0.03 0.03 Org

5. Jenis Pekerjaan : Pekerjaan Beton tumbuk 1:3:5

Volume Pekerjaan : 0.35 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Semen ( PC ) Zak 6.800 0.35 2.38 2.38 Zak Pasir Pasang m3 0.540 0.35 0.19 0.19 m3 Kerikil Beton m3 0.810 0.35 0.28 0.28 m3

Tenaga Kerja Pekerja OH 2.000 0.35 0.70 0.70 Org Tukang Batu OH 0.350 0.35 0.12 0.12 Org Kepala Tukang OH 0.035 0.35 0.012 0.012 Org Mandor OH 1.000 0.35 0.35 0.35 Org

6. Jenis Pekerjaan : Pekerjaan Plesteran 1:2

Volume Pekerjaan : 8.02 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Semen portland (50 Kg) Sak 0.170 8.02 1.36 1.36 Sak Pasir pasangan m3 0.017 8.02 0.14 0.14 m3

Tenaga Kerja Pekerja OH 0.200 8.02 1.60 1.60 Org Tukang batu OH 0.150 8.02 1.20 1.20 Org Kepala tukang OH 0.015 8.02 0.12 0.12 Org Mandor OH 0.010 8.02 0.08 0.08 Org

B. PEKERJAAN PAGAR KELILING BANGUNANI. PEKERJAAN PENDAHULUAN

1. Jenis Pekerjaan : Pekerjaan Bowplank

Volume Pekerjaan : 12.00 M'Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Kayu 5/7 Klas III M3 0.012 12.00 0.14 0.14 M3Paku 2" - 5 " Kg 0.020 12.00 0.24 0.24 Kg Kayu papan Klas III M3 0.007 12.00 0.08 0.08 M3

Tenaga Kerja Pekerja OH 0.100 12.00 1.20 1.20 Org Tukang Kayu OH 0.100 12.00 1.20 1.20 Org Kepala Tukang OH 0.010 12.00 0.12 0.12 Org Mandor OH 0.0050 12.00 0.06 0.06 Org

II. PEKERJAAN PONDASI1. Jenis Pekerjaan : Galian Tanah

Volume Pekerjaan : 34.60 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Tenaga Kerja Pekerja OH 0.400 34.60 13.84 13.84 Org

Page 50: Sopan Gadang Asli Penawaran

Mandor OH 0.040 34.60 1.38 1.38 Org

2 Jenis Pekerjaan : Pekerjaan Anstampang Batu Kali

Volume Pekerjaan : 8.40 M3Jangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Batu Belah 15 / 20 cm M3 1.200 8.40 10.08 5.04 M3 Pasir Urug M3 0.300 8.40 2.52 1.26 M3

Tenaga Kerja Pekerja OH 0.780 8.40 6.55 3.28 OrgTukang Batu OH 0.390 8.40 3.28 1.64 OrgKepala Tukang OH 0.039 8.40 0.33 0.16 Org Mandor OH 0.039 8.40 0.33 0.16 Org

3. Jenis Pekerjaan : Pekerjaan Pondasi Batu Kali 1:4

Volume Pekerjaan : 10.50 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Batu Belah 15 / 20 cm M3 1.100 10.50 11.55 11.55 M3 Semen ( PC ) Sak 3.260 10.50 34.23 34.23 Sak Pasir Pasang M3 0.520 10.50 5.46 5.46 M3

Tenaga Kerja Pekerja OH 1.500 10.50 15.75 15.75 Org Tukang Batu OH 0.600 10.50 6.30 6.30 Org Kepala Tukang OH 0.060 10.50 0.63 0.63 Org Mandor OH 0.075 10.50 0.79 0.79 Org

4. Jenis Pekerjaan : Urugan Kembali

Volume Pekerjaan : 9.10 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Tenaga Kerja Pekerja OH 0.192 9.10 1.75 1.75 Org Mandor OH 0.019 9.10 0.17 0.17 Org

III. PEKERJAAN BETON BERTULANG1. Jenis Pekerjaan : Pek. Sloof 15/20

Volume Pekerjaan : 2.10 M3Jangka Waktu Pelaksanaan : 1.00 Minggu

No URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

BESI BETONA TENAGA

1 Pekerja Org/Hari 0.8825 2.10 1.85 1.85 Org2 Tukang Besi Org/Hari 0.8825 2.10 1.85 1.85 Org3 Kepala Tukang Org/Hari 0.0883 2.10 0.19 0.19 Org4 Mandor Org/Hari 0.0378 2.10 0.08 0.08 Org

B. BAHAN

1 Besi beton (polos/ulir) Kg 132.3778 2.10 277.99 277.99 Kg2 Kawat beton Kg 1.8911 2.10 3.97 3.97 Kg

BEKISTINGA TENAGA

1 Pekerja Org/Hari 2.0010 2.10 4.20 4.20 Org2 Tukang kayu Org/Hari 1.7342 2.10 3.64 3.64 Org3 Kepala tukang Org/Hari 0.1734 2.10 0.36 0.36 Org4 Mandor Org/Hari 0.0334 2.10 0.07 0.07 Org

B. BAHAN

1 Kayu Papan Kls III M3 0.3002 2.10 0.63 0.63 M32 Paku biasa 2" - 5" Kg 2.0010 2.10 4.20 4.20 Kg

Page 51: Sopan Gadang Asli Penawaran

3 Minyak bekisting Lt 0.6670 2.10 1.40 1.40 Lt

BETON 1:2:3A TENAGA

1 Pekerja Org/Hari 2.0000 2.10 4.20 4.20 Org2 Tukang batu Org/Hari 0.3500 2.10 0.74 0.74 Org3 Kepala tukang Org/Hari 0.0350 2.10 0.07 0.07 Org4 Mandor Org/Hari 1.0000 2.10 2.10 2.10 Org

B. BAHAN

1 Semen portland (50 Kg) Zak 6.7200 2.10 14.11 14.11 Zak2 Pasir beton M3 0.5400 2.10 1.13 1.13 M33 Koral beton M3 0.8100 2.10 1.70 1.70 M3

3. Jenis Pekerjaan : Pek. Kolom 20/30 Volume Pekerjaan : 0.36 M3Jangka Waktu Pelaksanaan : 2.00 Minggu

No URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

BESI BETONA TENAGA

1 Pekerja Org/Hari 0.5702 0.36 0.21 0.10 Org2 Tukang Besi Org/Hari 0.5702 0.36 0.21 0.10 Org3 Kepala Tukang Org/Hari 0.0570 0.36 0.02 0.01 Org4 Mandor Org/Hari 0.0244 0.36 0.01 0.00 Org

B. BAHAN

1 Besi beton (polos/ulir) Kg 85.5275 0.36 30.79 15.39 Kg2 Kawat beton Kg 1.2218 0.36 0.44 0.22 Kg

BEKISTINGA TENAGA

1 Pekerja Org/Hari 2.0010 0.36 0.72 0.36 Org2 Tukang kayu Org/Hari 1.7342 0.36 0.62 0.31 Org3 Kepala tukang Org/Hari 0.1734 0.36 0.06 0.03 Org4 Mandor Org/Hari 0.0334 0.36 0.01 0.01 Org

B. BAHAN

1 Kayu Papan Kls III M3 0.3002 0.36 0.11 0.05 M32 Paku biasa 2" - 5" Kg 2.0010 0.36 0.72 0.36 Kg3 Minyak bekisting Lt 0.6670 0.36 0.24 0.12 Lt

BETON 1:2:3A TENAGA

1 Pekerja Org/Hari 2.0000 0.36 0.72 0.36 Org2 Tukang batu Org/Hari 0.3500 0.36 0.13 0.06 Org3 Kepala tukang Org/Hari 0.0350 0.36 0.01 0.01 Org4 Mandor Org/Hari 1.0000 0.36 0.36 0.18 Org

B. BAHAN

1 Semen portland (50 Kg) Zak 6.7200 0.36 2.42 1.21 Zak2 Pasir beton M3 0.5400 0.36 0.19 0.10 M33 Koral beton M3 0.8100 0.36 0.29 0.15 M3

4. Jenis Pekerjaan : Pek. Kolom 20/20 Volume Pekerjaan : 1.44 M3Jangka Waktu Pelaksanaan : 2.00 Minggu

No URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

BESI BETONA TENAGA

1 Pekerja Org/Hari 0.7632 1.44 1.10 0.55 Org2 Tukang Besi Org/Hari 0.7632 1.44 1.10 0.55 Org3 Kepala Tukang Org/Hari 0.0763 1.44 0.11 0.05 Org

Page 52: Sopan Gadang Asli Penawaran

4 Mandor Org/Hari 0.0327 1.44 0.05 0.02 OrgB. BAHAN

1 Besi beton (polos/ulir) Kg 114.4780 1.44 164.85 82.42 Kg2 Kawat beton Kg 1.6354 1.44 2.35 1.18 Kg

BEKISTINGA TENAGA

1 Pekerja Org/Hari 2.0010 1.44 2.88 1.44 Org2 Tukang kayu Org/Hari 1.7342 1.44 2.50 1.25 Org3 Kepala tukang Org/Hari 0.1734 1.44 0.25 0.12 Org4 Mandor Org/Hari 0.0334 1.44 0.05 0.02 Org

B. BAHAN

1 Kayu Papan Kls III M3 0.3002 1.44 0.43 0.22 M32 Paku biasa 2" - 5" Kg 2.0010 1.44 2.88 1.44 Kg3 Minyak bekisting Lt 0.6670 1.44 0.96 0.48 Lt

BETON 1:2:3A TENAGA

1 Pekerja Org/Hari 2.0000 1.44 2.88 1.44 Org2 Tukang batu Org/Hari 0.3500 1.44 0.50 0.25 Org3 Kepala tukang Org/Hari 0.0350 1.44 0.05 0.03 Org4 Mandor Org/Hari 1.0000 1.44 1.44 0.72 Org

B. BAHAN

1 Semen portland (50 Kg) Zak 6.7200 1.44 9.68 4.84 Zak2 Pasir beton M3 0.5400 1.44 0.78 0.39 M33 Koral beton M3 0.8100 1.44 1.17 0.58 M3

5. Jenis Pekerjaan : Pek. Ring Balok 13/15Volume Pekerjaan : 1.05 M3Jangka Waktu Pelaksanaan : 2.00 Minggu

No URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

BESI BETONA TENAGA

1 Pekerja Org/Hari 1.3011 1.05 1.37 0.68 Org2 Tukang Besi Org/Hari 1.3011 1.05 1.37 0.68 Org3 Kepala Tukang Org/Hari 0.1301 1.05 0.14 0.07 Org4 Mandor Org/Hari 0.0558 1.05 0.06 0.03 Org

B. BAHAN

1 Besi beton (polos/ulir) Kg 195.1576 1.05 204.92 102.46 Kg2 Kawat beton Kg 2.7880 1.05 2.93 1.46 Kg

BEKISTINGA TENAGA

1 Pekerja Org/Hari 2.0010 1.05 2.10 1.05 Org2 Tukang kayu Org/Hari 1.7342 1.05 1.82 0.91 Org3 Kepala tukang Org/Hari 0.1734 1.05 0.18 0.09 Org4 Mandor Org/Hari 0.0334 1.05 0.04 0.02 Org

B. BAHAN

1 Kayu Papan Kls III M3 0.3002 1.05 0.32 0.16 M32 Paku biasa 2" - 5" Kg 2.0010 1.05 2.10 1.05 Kg3 Minyak bekisting Lt 0.6670 1.05 0.70 0.35 Lt

BETON 1:2:3A TENAGA

1 Pekerja Org/Hari 2.0000 1.05 2.10 1.05 Org2 Tukang batu Org/Hari 0.3500 1.05 0.37 0.18 Org3 Kepala tukang Org/Hari 0.0350 1.05 0.04 0.02 Org4 Mandor Org/Hari 1.0000 1.05 1.05 0.53 Org

B. BAHAN

Page 53: Sopan Gadang Asli Penawaran

1 Semen portland (50 Kg) Zak 6.7200 1.05 7.06 3.53 Zak2 Pasir beton M3 0.5400 1.05 0.57 0.28 M33 Koral beton M3 0.8100 1.05 0.85 0.43 M3

IV. PEKERJAAN DINDING1. Jenis Pekerjaan : Pasangan Dinding Bata 1:4

Volume Pekerjaan : 64.51 M2Jangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Batu Bata Bh 70.000 64.51 4,515.70 2,257.85 Bh Semen portland Sak 0.230 64.51 14.84 7.42 Sak Pasir pasangan M3 0.043 64.51 2.77 1.39 M3

Tenaga Kerja Batu Bata OH 0.320 64.51 20.64 10.32 Org Semen portland OH 0.100 64.51 6.45 3.23 Org Pasir pasangan OH 0.010 64.51 0.65 0.32 Org Mandor OH 0.015 64.51 0.97 0.48 Org

V. PEKERJAAN PLESTERAN1 Jenis Pekerjaan : Pekerjaan Plesteran 1:4

Volume Pekerjaan : 177.16 M2Jangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Semen ( PC ) Sak 0.104 177.16 18.42 9.21 Sak Pasir Pasang m3 0.020 177.16 3.54 1.77 m3

Tenaga Kerja Pekerja OH 0.200 177.16 35.43 17.72 Org Tukang Batu OH 0.150 177.16 26.57 13.29 Org Kepala Tukang OH 0.015 177.16 2.66 1.33 Org Mandor OH 0.010 177.16 1.77 0.89 Org

2. Jenis Pekerjaan : Afwerking Beton

Volume Pekerjaan : 32.15 M2Jangka Waktu Pelaksanaan : 2.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Semen ( PC ) Sak 0.258 32.15 8.29 4.15 Sak Pasir Pasang m3 0.013 32.15 0.42 0.21 m3

Tenaga Kerja Pekerja OH 0.200 32.15 6.43 3.22 Org Tukang Batu OH 0.150 32.15 4.82 2.41 Org Kepala Tukang OH 0.015 32.15 0.48 0.24 Org Mandor OH 0.010 32.15 0.32 0.16 Org

Page 54: Sopan Gadang Asli Penawaran

VI. PEKERJAAN PENGECATAN1. Jenis Pekerjaan : Pek. Cat Dinding Pagar Dengan Cat Air

Volume Pekerjaan : 209.31 M2Jangka Waktu Pelaksanaan : 1.00 Minggu

URAIAN Satuan Indeks Volume Jumlah Jumlah/ Minggu

Bahan Plamir Kg 0.100 209.31 20.93 20.93 Kg Cat dasar Kg 0.100 209.31 20.93 20.93 KgCat Tembok Kg 0.260 209.31 54.42 54.42 Kg

Tenaga Kerja Pekerja Oh 0.020 209.31 4.19 4.19 Org Tukang cat Oh 0.063 209.31 13.19 13.19 Org Kepala tukang Oh 0.006 209.31 1.32 1.32 Org Mandor Oh 0.0025 209.31 0.52 0.52 Org

Payakumbuh, 4 Mei 2010Penawar

CV. FANNELIN

HENDRI UTAMA

Direktur

Page 55: Sopan Gadang Asli Penawaran

A N A L I S A T E K N I S

Page 56: Sopan Gadang Asli Penawaran

126.0741

0.0070

0.0070

0.0007

0.0003

1.0500

0.0150

6.67

0.30000.26000.02600.0050

0.04500.30000.1000

1

2.00000.35000.03501.0000

6.72000.54000.8100

195.7765

Page 57: Sopan Gadang Asli Penawaran

0.0070

0.0070

0.0007

0.0003

1.0500

0.0150

6.67

0.30000.26000.02600.0050

0.04500.30000.1000

1

2.00000.35000.03501.0000

6.72000.54000.8100

121.9812

0.0070

0.0070

0.0007

0.0003

1.0500

0.0150

6.67

0.30000.26000.02600.0050

0.04500.30000.1000

Page 58: Sopan Gadang Asli Penawaran

1

2.00000.35000.03501.0000

6.72000.54000.8100

195.7765

0.0070

0.0070

0.0007

0.0003

1.0500

0.0150

6.67

0.30000.26000.02600.0050

0.04500.30000.1000

1

2.00000.35000.03501.0000

6.72000.54000.8100

185.8644

0.0070

0.0070

0.0007

Page 59: Sopan Gadang Asli Penawaran

0.0003

1.0500

0.0150

6.67

0.30000.26000.02600.0050

0.04500.30000.1000

1

2.00000.35000.03501.0000

6.72000.54000.8100

185.8644

0.0070

0.0070

0.0007

0.0003

1.0500

0.0150

Page 60: Sopan Gadang Asli Penawaran

126.0741

0.0070

0.0070

0.0007

0.0003

1.0500

0.0150

6.67

0.30000.26000.02600.0050

0.04500.3000

Page 61: Sopan Gadang Asli Penawaran

0.1000

1

2.00000.35000.03501.0000

6.72000.54000.8100

81.4548

0.0070

0.0070

0.0007

0.0003

1.0500

0.0150

6.67

0.30000.26000.02600.0050

0.04500.30000.1000

1

2.00000.35000.03501.0000

6.72000.54000.8100

109.0267

0.0070

0.0070

0.0007

Page 62: Sopan Gadang Asli Penawaran

0.0003

1.0500

0.0150

6.67

0.30000.26000.02600.0050

0.04500.30000.1000

1

2.00000.35000.03501.0000

6.72000.54000.8100

185.8644

0.0070

0.0070

0.0007

0.0003

1.0500

0.0150

6.67

0.30000.26000.02600.0050

0.04500.30000.1000

1

2.00000.35000.03501.0000

Page 63: Sopan Gadang Asli Penawaran

6.72000.54000.8100