skripsi instrumentasi pabrik

Download Skripsi Instrumentasi Pabrik

If you can't read please download the document

Upload: nurfadi26

Post on 18-Apr-2015

555 views

Category:

Documents


10 download

DESCRIPTION

Skripsi Instrumentasi Pabrik, kumpulan Skripsi Instrumentasi Pabrik, s1 Skripsi Instrumentasi Pabrik

TRANSCRIPT

SKRIPSI INSTRUMENTASI PABRIKSILAHKAN KAMI TAMPILKAN JUDUL JUDUL SKRIPSI YANG ADA, BILA BERMINAT UNTUK MENDAPATKAN FILENYA ATAU MENDOWNLOADNYA SILAHKAN HUBUNGI email : [email protected] atau sms ke 085316254562

1. ANALISA HASIL PENGUJIAN MESIN VACUUM DRYER DENGAN BAHAN PISANG KEPOK PADA TEKANAN -76 CM/HG 2. ANALISA KARAKTERISTIK BIODIESEL BERBAHAN BAKU MINYAK KELAPA SAWIT 3. ANALISIS BEBAN KERJA DENGAN MENGGUNAKAN METODE RULA PADA STASIUN PEREBUSAN DI PABRIK KELAPA SAWIT PT. PP. LONDON _______ INDONESIA, TBK 4. ANALISIS FAKTOR-FAKTOR YANG MEMPENGARUHI KUALITAS TEH BOTOL SOSRO DENGAN MENGGUNAKAN METODE ANAVA DI PT SINAR SOSRO 5. ANALISIS KECELAKAAN KERJA DENGAN MENGGUNAKAN METODE JOB SAFETY ANALYSIS DI PT. ANUGRAH PRATAMA 6. ANALISIS PENGENDALIAN MUTU PADA PENGOLAHAN MINYAK SAWIT DENGAN METODE STATISTICAL QUALITY CONTROL (SQC) PADA PTP. NUSANTARA IV PKS ADOLINA 7. ANALISIS PENGUKURAN ELEKTROMAGNETIK PROMAG 50 W PADA PENGUKURAN ALIRAN AIR (APLIKASI PADA PDAM TIRTANADI PROPINSI _______ _______) 8. ANALISIS POTENSI BAHAYA DENGAN MENGGUNAKAN METODE JOB SAFETY ANALYSIS (JSA) PADA BAGIAN PRODUKSI DI PT. PP. LONSUM INDONESIA TBK 9. ANALISIS POTENSI BAHAYA SEBAGAI UPAYA PENANGGULANGAN KECELAKAAN KERJA DENGAN METODE JOB SAFETY ANALYSIS (JSA) DI PT. SERBA INDAH ANEKA PANGAN 10. EVAUASI KONSUMSI ENERGI LISTRIK BERDASARKAN HASIL BACA KWH METER PELANGGAN TERHADAP RATA-RATA NASIONAL (STUDI KONSUMSI PELANGGAN PLN KOTA _______) 11. MEKANISME PROSES PEMANASAN AIR DI DALAM BOILER DENGAN MEMPERGUNAKAN HEATER TAMBAHAN UNTUK EFISIENSI PEMBAKARAN 12. PEMANFAATAN UAP KERING SEBAGAI PRIME MOVER (PENGGERAK MULA) TURBIN UAP UNTUK MENGHASILKAN DAYA LISTRIK DI PTP. NUSANTARA II PKS PAGAR MARBAU 13. PEMELIHARAAN ALAT PENGERING BIJI (NUT SILO DRYER) PADA PABRIK KELAPA SAWIT PTPN-II TANJUNG GARBUS PAGAR MERBAU 14. PENDETEKSIAN KEASAMAN DAN KEBASAAN PADA PEMBUBURAN KERTAS DENGAN MENGGUNAKAN PH METER PADA PROSES BLEACHING (PEMUTIHAN) (APLIKASI PT. RIAU ANDALAN PULP AND PAPER)

15. PENENTUAN BIAYA PRODUKSI DENGAN ACTIVITY BASED COSTING (ABC) DI PT. ROLIMEX KIMIA NUSA MAS _______ 16. PENENTUAN JUMLAH MESIN SUGAR WEIGHTER BERDASARKAN PENGARUH WAKTU STANDAR DI STASIUN PENGEMASAN PADA PABRIK GULA KWALA MADU PTP. NUSANTARA II 17. PENENTUAN KEANDALAN SPARE PARTS YANG TERMASUK KELOMPOK KRITIS DENGAN METODE RELIABILITY PADA PT. CENTRAL WINDU SEJATI 18. PENENTUAN TENAGA KERJA YANG OPTIMAL PADA BAGIAN PACKING DENGAN MENGGUNAKAN WAKTU STANDAR PADA PT. ADIMULIA SARIMAS _______ 19. PENERAPAN BLANKET ORDER SYSTEM PADA PROSES PEMESANAN SPARE PART PERALATAN DI BAGIAN AUTOMOTIVE DAN HEAVY EQUIPMENT DI PT. ARUN LNG LHOKSEUMAWE 20. PENERAPAN SEVEN TOOLS DALAM PENGENDALIAN KUALITAS PRODUK KAYU PADA PT. BUKIT EMAS DHARMA UTAMA 21. PENGATURAN LEVEL PADA TANGKI LATEKS DENGAN MENGGUNAKAN SISTEM PNEUMATIK (APLIKASI PT.MEDISAFE TECHNOLOGIES) 22. PENGERINGAN BUBUK TEH DENGAN MENGGUNAKAN FLUID BED DRYER (FBD) (APLIKASI PTP.N.IV BAH BUTONG SIMALUNGUN) 23. PENGGUNAAN ADC (ANALOG TO DIGITAL CONVERTER) 0804 PADA PERANCANGAN SENSOR INTENSITAS CAHAYA 24. PENGGUNAAN CONTROL VALVE PADA STERILIZIER DENGAN FIG 360 104 UNTUK MENGONTROL ALIRAN STEAM (APLIKASI PTPN IV UNIT USAHA ADOLINA _______ _______ 25. PENGGUNAAN CONTROL VALVE PADA UNIT TOPING FRC-100-117 UNTUK MENGONTROL ALIRAN HGO (HEAVY GAS OIL) (APLIKASI PT. PERTAMINA UP II DUMAI) 26. PENGGUNAAN CORIOLIS MASS FLOW METER SEBAGAI PENGONTROL LAJU ALIRAN PADA STASIUN DEMIN PLANT UNIT BOILER (APLIKASI PTPN IV UNIT USAHA ADOLINA) 27. PENGGUNAAN DEAERATOR DAN ECONOMIZER SEBAGAI INSTRUMENT PENDUKUNG DALAM PEMANASAN AIR PADA PROSES KERJA BOILER (APLIKASI PADA POWER PLANT PT. CANANG INDAH) 28. PENGGUNAAN DIFFERENTIAL PRESSURE TRANSMITTER UNTUK MENGUKUR LEVEL AIR PADA TANGKI 29. PENGGUNAAN DROSS PRESS MACHINE SEBAGAI PEMISAH KOTORAN DARI ALUMINIUM DI UNIT BILLET PLANT APLIKASI PT. CAKRA COMPACT ALUMINIUM INDUSTRIES TANJUNG MORAWA 30. PENGGUNAAN ELECTROSTATIC PRECIPITATOR SEBAGAI PENANGGULANGAN POLUSI UDARA PADA CEROBONG GAS BUANG BOILER (APLIKASI DEPT. POWER PLANT PT. CANANG INDAH) 31. PENGGUNAAN LOAD CELL PADA JEMBATAN TIMBANG SEBAGAI SENSOR PENGUKUR BERAT ( APLIKASI DI PT. MEDISAFE TECHNOLOGIES ) 32. PENGGUNAAN PHOTOELECTRIC UNTUK PENGAWASAAN DISTRIBUSI ALUMINI (APLIKASI PT. INALUM)

33. PENGGUNAAN SENSOR PELATINUM RESISTENCE PT 100 UNTUK MENGONTROL TEMPERATUR MINYAK PADA CRYSTALIZER TANK (APLIKASI PADA PT. SMART TBK, BELAWAN) 34. PENGGUNAAN SENSOR PROXIMITY JENIS KAPASITIF DALAM OPERASI CRANE PENGGANTI ANODA DI UNIT REDUCTION PLANT PT. INALUM KUALA TANJUNG ASAHAN 35. PENGGUNAAN SENSOR PYROMETER SEBAGAI ALAT UNTUK MENGUKUR TEMPERATUR MATERIAL PADA KILN (APLIKASI PT. SEMEN PADANG) 36. PENGGUNAAN SENSOR ULTRASNIK UNTUK MENGUKUR LEVEL KOKAS PADA SILO (APPLIKASI PT. INALUM KUALA TANJUNG) 37. PENGHITUNGAN WAKTU STANDARD DAN PENENTUAN JUMLAH TENAGA KERJA PADA BAGIAN PENGEPAKAN PT. SINAR OLEOCHEMICAL INTERNATIONAL (PT. SOCI) 38. PENGISIAN BOTOL MINUMAN DENGAN MENGGUNAKAN MESIN FILLER DI PT. COCA COLA BOTTLING INDONESIA 39. PENGONTROLAN LEVEL STEAM DRUM PADA BOILER HRSG MENGGUNAKAN DCS CENTUM CS-3000 APLIKASI PT. ARUN NGL 40. PENGONTROLAN TEKANAN PADA BOILER DENGAN MENGGUNAKAN DISTRIBUTED CONTROL SYSTEM ( DCS ) CENTUM CS 3000 DI UNIT 92 HRSG (APLIKASI DI PT. ARUN NGL) 41. PENGONTROLAN TEMPERATUR DENGAN MENGGUNAKAN TERMOKOPEL PADA MULTIFUEL BOILER (APLIKASI PT. INTI KIMIATAMA PERKASA) 42. PENGUKURAN ALIRAN STEAM MENGGUNAKAN HEAD FLOWMETER DENGAN DIFFERENSIAL PRESSURE TRANSMITTER 43. PENGUKURAN DAN PERBAIKAN PRODUKTIVITAS DENGAN MENGGUNAKAN MODEL APC (AMERICAN PRODUCTIVITY CENTER) DI PT. PANTJA SURYA 44. PENGUKURAN LEVEL DENGAN MENGGUNAKAN SISTEM BOYANCY YANG TERPASANG PADA MENARA DESTILASI 45. PENGUKURAN PRODUKTIVITAS PARSIAL DENGAN MENGGUNAKAN METODE POSPAC PADA PT. SOCFIN INDONESIA KEBUN AEK PAMIENKE 46. PENGUKURAN TINGGI TABUNG DENGAN MENGGUNAKAN SENSOR KERAMIK 47. PENGUNAAN RESISTENSI PRESSURE TRANSMITTER PADA PENGONTROLAN SUPLAI UDARA INSTRUMEN DALAM PROSES SQUEEZING PADA ALAT FILTER PRESS (APLIKASI PT.MULTI MAS NABATI ASAHAN) 48. PENINGKATAN EFEKTIVITAS MESIN EXTRUDER MATADOR EX 920 DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. CENTRAL PROTEINA PRIMA TBK 49. PENJADWALAN MESIN DENGAN METODE CDS (CAMPBELL, DUDEK & SMITH) DAN METODE PALMER PADA BAGIAN CASTING SHOP DI PT. INDONESIA ASAHAN ALUMINIUM (INALUM) 50. PENSTABILAN TEGANGAN BOLAK BALIK SATU PHASA DENGAN TRIAC

51. PENYEIMBANGAN LINTASAN PRODUKSI UNTUK MENINGKATKAN EFESIENSI DAN PRODUKTIVITAS PADA PT. OCEAN CENTRA FURNINDO 52. PERANCANGAN ALAT PENGHITUNG JUMLAH ORANG DALAM SUATU RUANGAN DENGAN MENGGUNAKAN SENSOR INFRA MERAH BERBASIS MIKROKONTROLER AT89S52 53. PERANCANGAN ALAT UKUR SUHU JARAK JAUH DENGAN MEMANFAATKAN FREKUENSI RADIO 434 MHZ BERBASIS MIKROKONTROLLER AT MEGA 8535 DENGAN DISPLAY LCD 54. PERANCANGAN PENGAMAN LOKER OTOMATIS DENGAN MENGGUNAKAN PASSWORD BERBASIS MIKROKONTROLER AT89S51 55. PERANCANGAN ROBOT PENGHINDAR DINDING DENGAN MENGGUNAKAN SENSOR INFRA MERAH BERBASIS MIKROKONTROLER AT89S51 56. PERANCANGAN SISTEM PENGAMAN GEDUNG DAN PERALATAN LISTRIK TERHADAP BAHAYA KEBAKARAN BERBASIS MIKROKONTROLER AT89C2051 57. PERANCANGAN SISTEM PENGENDALIAN SUHU BERBASIS MIKROKONTROLER AT89S51 58. PERAWATAN TURBIN GAS SINGLE SHAFT MARK II PADA POWER GENERATOR 9001H APLIKASI PT. ARUN NGL 59. PERBAIKAN PENJADWALAN PRODUKSI DENGAN MENGGUNAKAN METODE ALGORITMA CDS (CAMPBELL, DUDEK AND SMITH) PADA PT. JAKARANA TAMA 60. PERENCANAAN JADWAL INDUK PRODUKSI DI PT. ROLIMEX KIMIA NUSA MAS 61. PERENCANAAN PEMELIHARAAN MESIN SECARA TERENCANA DENGAN MENGGUNAKAN METODE FUNGSI KEPADATAN KEMUNGKINAN PADA PT. PUPUK SRIWIDJAJA BELAWAN 62. PERENCANAAN SISTEM ALARM KEBAKARAN (APLIKASI PADA RUMAH SAKIT CUT NYAK DIEN, MEULABOH) 63. PRA RANCANGAN PABRIK BENANG KARET DARI LATEKS DENGAN KAPASITAS 4100 TON/BULAN DI KAWASAN INDUSTRI _______ TANJUNG MORAWA, PROPINSI _______ _______. 64. PRINSIO KERJA TRANSMITTER PNEUMATIK DALAM DALAM PENGUKURAN LEVEL PADA TANGKI TERBUKA (APLIKASI LABORATORIUM PTKI _______ SUMUT) 65. PRINSIP KERJA CONDUCTIVITY SENSOR DALAM PENGUKURAN DAYA HANTAR LISTRIK SUATU FLUIDA (APLIKASI PT. RIAU ANDALAN PULP AND PAPER) 66. PRINSIP KERJA DIFFERENTIAL PRESSURE TRANSMITTER PADA PENGUKURAN ALIRAN STEAM (UAP) APLIKASI DEPT. POWER PLANT PT. CANANG INDAH 67. PRINSIP KERJA PENGUKURAN ALIRAN FLUIDA DENGAN MENGGUNAKAN TRANSMITTER ELEKTRIK 68. PRINSIP KERJA PENGUKURAN LAJU ALIRAN PADA PIPA DENGAN MENGGUNAKAN PLAT ORIFICE DENGAN TRANSMITTER ELEKTRIK (APLIKASI LABORATORIUM PTKI _______-SUMUT)

69. PRINSIP KERJA SENSOR TEKANAN (3051CA) UNTUK MENGINDIKASIKAN KEADAAN VAKUM PADA DEODORIZE (APLIKASI PADA PT. MULTIMAS NABATI ASAHAN) 70. PRINSIP KERJA THERMOSTAT CONTROL VALVE PADA PIPA TANGKI TIMBUN CPO 71. PRINSIP KERJA TRANSMITTER PNEUMATIK PADA SISTEM PENGUKURAN LEVEL CAIRAN DALAM TANGKI 72. RANCANGAN SISTEM INFORMASI NOMOR KODE BEARING DI PT. RIAU SAUDARA MANDIRI 73. RANCANG BANGUN KONSTRUKSI ALAT PENGERING VAKUM 74. RANCANG BANGUN MESIN PENGIRIS UBI KAPASITAS 30 KG/JAM 75. REPLACEMANT STUDY TERHADAP MESIN PRESS PADA PT. SERBA INDAH ANEKA PANGAN 76. REPLACEMENT STUDY TERHADAP MESIN THRESER PADA PABRIK KELAPA SAWIT PT. TOLAN TIGA INDONESIA KEBUN PERLABIAN 77. SISTEM KENDALI PENYALURAN AIR PENDINGIN (WATER CHILLER) PADA PROSES PENCETAKAN SARUNG TANGAN LATEX (APLIKASI PT. MEDISAFE TECHNOLOGIES) 78. SISTEM KERJA DIFERENSIAL TRANSMITTER ELEKTRIK TIPE UME 2 SMK 1/24 VDC/4-20 MA/P-3500 MM H2O SEBAGAI SENSOR UNTUK MENGUKUR BESARNYA TINGGI PERMUKAAN CAIRAN 79. SISTEM KERJA DIFFERENTIAL TRANSMITTER ELECTRIC UNTUK MENGUKUR LEVEL AIR PADA TANGKI D1 DI PABRIK MINI PTKI _______ 80. SISTEM KERJA PENGENDALI PERANGKAT ELEKTRONIK RUMAH (ON/OFF) BERBASIS MIKROKONTROLER AT89S52 DENGAN MENGGUNAKAN TELEPON CORDLESS 81. SISTEM KERJA PENGENDALI PERANGKAT ELEKTRONIK RUMAH (ON/OFF) BERBASIS MIKROKONTROLER AT89S52 DENGAN MENGGUNAKAN TELEPON CORDLESS 82. SISTEM KERJA SENSOR TABUNG VENTURI UNTUK PENGUKURAN LAJU ALIRAN FLUIDA DALAM PIPA DI LABORATORIUM OPERASI PABRIK PTKI 83. SISTEM KERJA VIBRATING SCREEN SEBAGAI ALAT PEMISAH ANTARA FIBRE DENGAN MINYAK DI PKS PTPN IV DOLOK SINUMBAH 84. SISTEM PENGONTROLAN TEMPERATUR HOLDING FURNACE PADA PROSES PENCETAKAN ALUMINIUM (APLIKASI PT. INDONESIA ASAHAN ALUMINIUM) 85. SISTEM PENGOTROLAN MESIN CASE PAKER (MESIN PENGISI KRAT) DENGAN MENGGUNAKAN PLC TIPE SIEMENS S7-200 (APLIKASI PT. COCA-COLA BOTLLING INDONESIA UNIT _______-SUMUT) 86. SISTEM TEMPERATUR OTOMATIS PADA OVEN BERBAHAN BAKAR LPG 87. SISTIM PROTEKSI PADA MOTOR INDUKSI TIGA PHASA 88. STUDI APLIKASI LEVEL ELEKTRODA (NRG 19-11) PADA UNIT HIGH RESSURE BOILER (APLIKASI PT. MULTIMAS NABATI ASAHAN) 89. STUDI AUXILIARY STEAM PRESSURE CONTROL PADA PLTU UNIT 3 DAN 4 PT. PLN (PERSERO) WILAYAH II SEKTOR BELAWAN 90. STUDI FLOWMETER MAGNETIK (APLIKASI PADA LABORATORIUM INSTRUMENTASI PTKI _______-SUMUT)

91. STUDI MENGENAI UMUR EKONOMIS MESIN CONTACT BLAST FREEZER UNTUK MENENTUKAN KEBIJAKSANAAN REPLACEMENT 92. STUDI PENDEKATAN METODE VALUE ADDED UNTUK PENGUKURAN PRODUKTIVITAS PADA PT. BUKIT EMAS DHARMA UTAMA 93. STUDI PENERAPAN METODE EVOLUTIONARY OPERATION (EVOP) DALAM PERANCANGAN QUALITY CONTROL UNTUK PERBAIKAN PROSES DI PT. COCA-COLA BOTTING INDONESIA 94. STUDI PENGGUNAAN AUTO-SYNCHRONIZER DALAM MEMPARALEL ALTERNATOR 95. STUDI PENGUKURAN KECEPATAN P_______N MENGGUNAKAN TACHOMETER DIGITAL 96. STUDI PENINGKATAN LINGKUNGAN KERJA YANG HIGIENIS DI BAGIAN PRODUKSI DENGAN PENERAPAN 5 S DI UD. PUTRI JUNA 97. STUDI PROMAG 33 ELETROMAGNETIC FLOW MEASURING PULP DRYER DI PABRIK KERTAS 98. STUDI RELE PENGAMAN STANDBY GENSET DI PT. COCA - COLA BOTTLING INDONESIA BELAWAN - _______ 99. STUDI SIMULASI PENJADWALAN PENGGUNAAN PERALATAN LISTRIK PELANGGAN KOTA _______ ( UNTUK MEREDUKSI KONSUMSI ENERGI LISTRIK ) 100. STUDI SISTEM KELISTRIKAN PADA PABRIK KELAPA SAWIT (APLIKASI PT. PN III KEBUN SEI SILAU KISARAN) 101. STUDI TENTANG CARA KERJA ALAT UKUR LEVEL UNTUK ALUMINIA (AL2O3) DENGAN MENGGUNAKAN MICROIMPULSE LEVELFLEX FMP 232 E / 332 E 102. STUDI TENTANG CARA KERJA DIFFERENTIAL TRANSMITTER ELEKTRIK UNTUK MENGUKUR LEVEL AIR PADA TANGKI D1 DI PT. ECOGREEN OLEOCHEMICAL 103. STUDI TENTANG KETIDAKAKURATAN PENGUKURAN LEVEL PADA PROSES LIQUID LEVEL CONTROL LEVEL DI LABORATORIUM PTKI _______ 104. TEKNIK KALIBRASI THERMOCOUPEL TYPE K DI PT INALUM KUALA TANJUNG 105. ULASAN PERBAIKAN EFFEKTIVITAS MESIN DENGAN MENGGUNAKAN METODE OVERALL EQUIPMENT EFFEKTIVENESS SEBAGAI DASAR PENERAPAN TOTAL PRODUCTIVE MAINTENANCE DI PTPN IV PABATU 106. ULASAN PERBAIKAN TATA LETAK LANTAI PRODUKSI PADA PT. BLUESCOPE LYSAGHT INDONESIA 107. _______LAN PERBAIKAN EFEKTIVITAS MESIN DENGAN MENGGUNAKAN METODE OVERALL EQUIPMENT EFECTIVENESS SEBAGAI DASAR PENERAPAN TOTAL PRODUCTIVE MAINTENANCE DI PT. WIKA