RENCANA ANGGARAN BIAYA

( ENGINEERING ESTIMATE )

TAHAP II

KEGIATAN

PEMBANGUNAN SISTEM PENYEDIAAN AIR MINUM ( DAK TAMBAHAN )

PEKERJAAN

PEMBANGUNAN SISTEM PENYEDIAAN AIR MINUM ( DAK TAMBAHAN )

LOKASI

KABUPATEN MALINAU

2 0 1 5

Page 2: SAMPUL RAB.doc

SKET GAMBAR

1. PERHITUNGAN DIAMETER PIPA HDPE

Q = 0,2785 x C x D2,63 x S0,54

dimana :

Koefesien Pipa HDPE ( C ) = 140,00

1. S = kemiringan Pipa

2. Tinggi Tekanan E. A – El.D’ = 12,50 m

3. Kehilangan Tekan Pipa el.D’ – el. E = 8,00 m

4. Panjang Pipa HDPE ( L ) = 253,50 m

5. Debit yang ada = 0,002 m3/det

Untuk Sisa Tinggi Tekan (H) = 12,50 – 8,00

= 4,50 m

4,50S = = 0,0178

253,50

44.172

49.172

42.250

36.845

36.172

40.672

43.172

39.172MAN

Pipa HDPE Ø 110 mm (existing) Pjg. 182 m

Pipa HDPE Ø 75 mmPjg. 60 m

Pipa HDPE Ø 63 mm Panjang 140 m

Pipa HDPE Ø 63 mmPanjang 33.50 m

Page 3: SAMPUL RAB.doc

Jadi diameter yang perlukan :

Q = 0,2785 x C x D2,63 x S0,54

0,002 = 0,2785 x 140 x D2,63 x (0,0178)0,54

0,002 = 4,4277 x D2,63

0,0020D2,63 =

4,4277

= 0,00045

2,63

D = √ 0,00045

= 0,054 m

= 54 mm 63 mm

Jadi pipa yang di gunakan diameter ( D ) = 63 mm

2. PERHITUNGAN DEBIT PIPA HDPE DI JEMBATAN GANTUNG

Q = 0,2785 x C x D2,63 x S0,54

dimana :

1. Koefesien Pipa HDPE ( C ) = 140,00

2. kemiringan Pipa = 0,00286

3. Diamter Pipa HDPE = 0,063 m

4. Luas Pipa HDPE 0,063 m ( A ) = 0,0031m2

Debit Pipa PDPE di Jembatan Gantung :

Q = 0,2785 x C x D2,63 x S0,54

Q = 0,2785 x 140 x (0,063)2,63 x (0,00357)0,54

= 0,2785 x 140 x 0,000695 x 0,0477

= 0.00129 m3/det

Page 4: SAMPUL RAB.doc

Kecepatan Air ( V ) :

QV =

A

0,00129V =

0,0031

= 0,416 m/det