review network modeling
TRANSCRIPT
Harun al-‐Rasyid LUBIS h4p://personal.;sl.itb.ac.id/halubis/
Fakultas Teknik Sipil dan Lingkungan ITB
SJ-‐5245 Pemodelan Sistem Transportasi
Review Transporta/on Network Modeling
1
2
Review : Model Transport 4 Tahap
Trip Generation
Trip Distribution
Modal Split
Trip Assignment
Volume Lalu Lintas
Jaringan Transportasi
Sistem Zona
Tata Guna Lahan dan Karakteristik Sosio
Ekonomi
Traffic (Trip) Assignment Trip Generation
Trip Distribution
Transit Estimation & Mode Split
Time-of-Day & Directional Factoring
Transit Person Trip Table (O&D)
Vehicle Trip Table (O&D)
Trip Assignment
Loaded Transit Network
Loaded Highway Network
Network m
odeling
3
5
Asal /Origin (O)
Tujuan /Destination (D)
Perjalanan /Trip (t)
Perjalanan/Trip
D5 D1
O
D2 D3
D4 30%
20%
10%
25%
15%
Bangkitan seluruh perjalanan dari zona asal (O)
Distribusi seluruh perjalanan dari zona asal (O) ke semua zona tujuan (D)
Mobil Pribadi 25% Kendaraan Umum
20% Motor 30% Tak Bermotor 15% Jalan Kaki 10%
Tujuan /Destination
(D1)
Asal /Origin (O)
Asal /Origin (O)
Tujuan /Destination
(D1)
Σ t
Pemilihan/pemisahan perjalanan menurut jenis moda dari zona asal (O) ke zona tujuan (D1)
Pembebanan perjalanan menurut jenis moda kepada rute-rute (jaringan) diantara pasangan zona asal (O) dan zona tujuan (D) utk public dan private transport
Terminology • Network, node and links
(arcs)
• Highway/trip assignment • Transit trip assignment • All-‐or-‐nothing assignment • Equilibrium assignment
• Cost-‐flow or volume-‐delay funcVon
• Free-‐flow speed • Free-‐flow travel Vme • Generalized cost
• Path finding • Impedance • WaiVng Vme • Access Vme
• Path loading • Level of service • Capacity restraint
6
9
Asumsi Dasar Model Transport
• Pola interaksi dan perilaku
• Memaksimalkan uVlitas
• KeseVmbangan (equilibrium)
• Agregasi
10
Interaksi Transport – Tata Guna Lahan Pemilihan
Rute
Pemilihan Moda
Pemilihan Tujuan
Keputusan Melakukan Perjalanan
Kepemilikan Kendaraan
Aktifitas
Penempatan Lahan
Pembangunan
Pemilihan Lahan oleh Investor
Pemilihan Lahan oleh Pengguna
Daya Tarik Lahan
Aksesibilitas
Waktu Tempuh/ Jarak/Biaya
Volume di Ruas Jalan
TRANSPORTASI
GUNA LAHAN
Tata ruang dan transportasi
RUANGAKTIVITAS
POTENSI PERGERAKAN
PERFORMANCE INDICATORSISTEM
TRANSPORTASI
akse
sibi
litas
Hambatan ruang
Kapasitas
Direpresentasikan oleh:1. Jaringan transportasi
a. Prasaranab. Sarana
2. Pengaturan
RUANGAKTIVITAS
POTENSI PERGERAKAN
PERFORMANCE INDICATORSISTEM
TRANSPORTASI
akse
sibi
litas
Hambatan ruang
Kapasitas
Direpresentasikan oleh:1. Jaringan transportasi
a. Prasaranab. Sarana
2. Pengaturan 11
12
Proses Pemodelan Transport
“Best fit” model
Variabel model
Base year data
Spesifikasi Model
Struktur model
Kalibrasi Model
Validasi Model
Validation data
Predicted data
Implementasi Model Out put model
Analisis
Transit Assignment Results 2001 Base Case
Observed vs Predicted Transit Line Boardings
02000400060008000100001200014000
0 2000 4000 6000 8000 10000 12000
Observed
Pred
icte
dPRED
Total Boardings by Sub-Mode OBS PRED RMSE RMS%Durham Bus 7499 7164 126.1891 1.68%York Bus 7111 7280 143.0784 2.01%Peel Bus 38497 40217 332.7368 0.86%Halton Bus 4536 4990 81.51716 1.80%HSR Bus 15982 16337 292.8422 1.83%GO Bus 7172 7353 399.3889 5.57%GO Rail 13659 13735 645.6756 4.73%TTC Bus 282084 260041 1038.175 0.37%TTC Prem Bus 672 101 176.9569 26.33%TTC Subway 254060 235691 9103.319 3.58%TTC Streetcar 47097 47097 1201.121 2.55%Overall 678369 640006 1036.107 0.15%
Final parameter sedngs with embedded transit fares seem to be providing good assignment of transit trips to lines and sub-‐modes.
14
17
Sistem Zona (kecamatan) contoh : Jakarta Mass Rapid Transit System Study
211
241
212 213
214
215
216
217
218
231
227
226
225
224
223
232
234
233
222
242
245
246
249
238
237
236
235
244
243
251 253
259 261
254 248
247 255
256
257
258
271
Zona Internal
Zona Eksternal
Greater Bandung Metropolitan Public Transport Zoning
13 Zones based on Density
5 6 7
2 3 4 1
North BMA (Cimahi +Bandung Barat) 1 = Kota Cimahi 2 = Kota Bandung 2 3 = Kota Bandung 3 4 = Kota Bandung 4 5 = Kota Bandung 5 6 = Kota Bandung 6 7 = Kota Bandung 7
South West Bandung
South East Bandung
South West BMA South East BMA
Sumedang
18
Greater Bandung Metropolitan Public Transport Socio-‐economic Analysis
PopulaVon and GDP by Zones in BMA (2006)
No. Des cription P opulation in 1,000
GDP per capita in Mio
R s
Z one 1 K ota Bandung 1 375
Zone 2 K ota Bandung 2 475
Zone 3 K ota Bandung 3 263
Zone 4 K ota Bandung 4 234
Zone 5 K ota Bandung 6 525
Zone 6 K ota Bandung 5 307
Zone7 North BMA 950 13
Zone 8 S outh Wes t BMA 1.105 15
Zone 9 S outh E as t BMA 545 13
Zone10 S outh E as t Bandung 800 15
Zone 11 S outh Wes t Bandung 710 15
Zone 12 C imahi NW Bandung 520 16
Zone 13 S pecial Z one S umedang 235 9
18
19
Zone x
Zone z
Zone y
Greater Bandung Metropolitan Public Transport
Methodology of the Analysis of Traffic Pa4ern in BMA (1)
Commuter Rail
Toll Road
Bus Line
Traffic Volume
Each Zone is trips Generator and a4ractor
20
MULTIMODAL NETWORK REPRESENTATION
A C
B
Jl,Rl Jl
Jl,Kl A C
B
:Jalan :Rel :Kapal
(a) (b)
Penyederhanaan tampilan jaringan
TiVk simpul (TERMINAL) tempat perpindahan moda
23
MODELLING OF SEA NODE
Dermaga
Waktu Merapat
Waktu Tunggu
Source: Diolah dari PELINDO
• Berthing time, approaching and waiting time is time to represent sea node capacity
• Sea node capacity depend on loading and unloading facilities and type of commodity – Container, bulk and liquid cargo have fast loading and unloading
– General cargo has slow loading and unloading
• Berthing time, approaching and waiting time also represent process of loading and unloading
Berth
Berthing Vme
WaiVng and Approaching Time
24
25
Rail StaVon Micro-‐coding
Streets Bus plalorm node
Rail plalorm node MetroRail
PNR KNR
Time= ~1 min
Time= ~0.5 min
Time= ~2 min
Time= ~2 min
Access Connectors Escalator Link
Time= ~1 min
Source: AECOM Consult
Trip Assignment Methods
• All-‐or-‐nothing assignment
• Equilibrium assignment (approximaVon!)
• StochasVc assignment
APPLICATIONS:
• Road assignment
• Transit assignment (for public transport) 27
Trip Assignment ObjecKves:
• Explain the concept of an all-‐or-‐nothing assignment
• Explain the concept of an equilibrium assignment
• MathemaVcal formulaVon & finding soluVon + algorithm
• IdenVfy the cost-‐flow or delay-‐flow funcVon
29
Inputs and Outputs Inputs
• O&D trip table • Coded network
Outputs
• Link flows as per coded network • Link travel Vmes/speeds
• VMT
• Vehicle hours of travel
30
Step 3: Continue until trips between all TAZ pairs have been assigned
Step 2: Assign all trips to links compromising shortest route
Step 1: Find Shortest route between the TAZs
All-‐or-‐Nothing Assignment
Advantages
• Simple
• Inexpensive • Results easy to understand
Disadvantages
• Assumes all traffic will travel on shortest path
• Creates unrealisVc flow pa4erns
31
Logit model
Can set Ui = 1/4i, but if you do, will need a calibraVon coefficient
Can set Ui = -‐4i
(7) (8)
(9)
67
24
9
These results From this specificaVon
32
Capacity Restraint • Volume-‐delay relaVonship
• Average travel speed decreases with increased flow (volume)
• Average travel Vme increases as the volume-‐to-‐capacity raVo on a link increases
• The Bureau of Public Roads (BPR) formula, used as default in
most model packages shows this relaVonship:
Travel Vme depends on the loading, but the loading depends on the travel Vme – it’s an iteraVve process
33
4/5/16 35
One attempt to represent the relationships among urban activities and transportation modes.
PTV America, Inc.
Jenis Pergerakan a. Eksternal – Eksternal b. Eksternal – Internal c. Internal –internal
Sumatera
c
a
b
b
Prov. Banten
D K I
JABAR
Pola Pergerakan Angkutan
KAB.PANDEGLANG
KOTA.SERANG KAB.TANGGERANG
KAB.LEBAK
KOTA.CILEGON
KAB.SERANG KOTA
TANGGERANG
KOTA TANGGERANG
SELATAN
Basis Pemodelan Transportasi
Data Jaringan dan Data Zona
(18 x 18)
• Analisa Kebutuhan • Penanganan Jaringan
OD / MAT Dasar (2012)
Model SATURN (Buffer network)
Prediksi Arus Lalu Lintas y.a.d
Model Distribusi ( Gravitasi & Furness )
Proyeksi MAT y.a.d
O-‐D 2011
1 Kota Tangerang 101 2 Kab Tangerang 102 3 Kota Tangerang Selatan 103 4 Kota Serang 104 5 Kota Cilegon 105 6 Kab Serang 106 7 Kab Pandeglang 107 8 Kab Lebak 108 9 Kab Pandeglang 2 207 10 Kab Lebak 2 208 11 Local Atrac/on 401 12 Local Atrac/on 402 13 Local Atrac/on 403 14 Local Atrac/on 404 15 Local Atrac/on 405 16 DKI Jakarta 901 17 Jawa Barat 902 18 Sumatera 903
Sistem Zona Prov. Banten ( 18 x 18)
1 Kota Tangerang 101
2 Kab Tangerang 102
3 Kota Tangerang Selatan 103
4 Kota Serang 104
5 Kota Cilegon 105
6 Kab Serang 106
7 Kab Pandeglang 107
8 Kab Lebak 108
9 Kab Pandeglang 2 207
10 Kab Lebak 2 208
11 Local A9rac/on 401
12 Local A9rac/on 402
13 Local A9rac/on 403
14 Local A9rac/on 404
15 Local A9rac/on 405
16 DKI Jakarta 901
17 Jawa Barat 902
18 Sumatera 903
Permasalahan transportasi Prov. banten
-TRANSPORTASI DARAT • Kemacetan
Banyak faktor yang menjadi penyebab kemacetan di wilayah ini, namun peningkatan jumlah kendaraan tanpa diiringi dengan pelebaran jalan yang memadai adalah penyebab utama kemacetan.
• Kerusakan Jalan Berbagai macam hal dapat menyebabkan kerusakan jalan di Prov. Banten, di antaranya: # Peningkatan beban / overloading # Air tak terkendali # Material konstruksi perkerasan # Kondisi tanah dasar yang tidak stabil # Iklim dan cuaca # Proses pemadatan perkerasan di atas tanah dasar yang kurang baik.
• Rendahnya Kualitas pelayanan angkutan Umum ( lokal dan komuter) • Tersendatnya penyebrangan Merak-Bakauhuni ( hambatan alam, kurang armada siap operasional)
• TRANSPORTASI LAUT • * Tersendatnya rencana pembangunan Pelabuhan Internasional, SptPel. Bojonegara
- TRANSPORTASI UDARA
* Lalu Lintas yang padat, baik pesawat maupun penumpang yang diakibatkan pertumbuhan penumpang yang sangat tinggi tidak diimbangi dengan penambahan luas area Bandara, * Permasalahan SDM pengelola * Rendahnya akses menuju ke Bandara, di mana akses menuju Bandara hanya di dominasi oleh kendaraan pribadi, taxi, travel dan bus.
Micro simulator
4/5/16 45
h4ps://www.youtube.com/user/quadstoneparamics h4p://www.paramics-‐online.com/paramics-‐movies.php h4p://www.paramics-‐online.com/paramics-‐product-‐tour.php
Penamaan Ruas dan Simpang
15
14
8
9
11 12
1
2
3
4
5
6
710
13
A
B
C
D
F
G
H
I
JK
L
M
N
O
PQ
R
S
T
U
V W
X
Y
8 : Nomor Simpang
A : Kode Ruas
Keterangan:Z
Z
E
47
Hasil Validasi 2015 pada Jam Puncak Sore
15
14
8
9
11 12
13
1
2
3
4
6
7
10
A
B
F
G
K
L
N
O
PQ
R
S
T
U
V W
X
Y
8 : Nomor Simpang
A : Kode Ruas
Keterangan:Z1
H
516
ED Z
M
GEH 4.25GEH 3.05
GEH 3.44
GEH 4.17
GEH 3.16
GEH 2.85
GEH 0.85
GEH 3.41
GEH 4.95
GEH 4.27
GEH 6.1 GEH 5.49
GEH 2.06
GEH 1.02
GEH 2.37
48
Kinerja Jaringan Jalan Tahun 2015 Pagi
: Panjang Antrian
TZ
H
Panjang antrian pada jam puncak pagi 49
Kinerja Jaringan Jalan Tahun 2015 Sore
: Panjang Antrian
N
M
T
Y
Panjang antrian pada jam puncak sore 50
Skenario Pemodelan • Traffic berkurang 20% akibat penerapan skenario penanganan di atas.
• Tambahan delay 15 detik per kendaraan pada akses masuk ke STJ.
51
Panjang Antrian pada Jam Puncak Pagi
donothing dosomething
: Panjang Antrian
do-nothing setelah penanganan, tanpa frontage road
52
Kecepatan Rata-rata pada Jam Puncak Pagi
Ket:
15
6060
10
donothing dosomething
do-nothing setelah penanganan, tanpa frontage road
53
Panjang Antrian pada Jam Puncak Sore donothing dosomething
: Panjang Antrian
setelah penanganan, tanpa frontage road
do-nothing
54
Panjang Antrian pada Jam Puncak Pagi
K
M
N
W
: Panjang Antrian
Setelah penanganan, tanpa
frontage road
setelah penanganan,
dengan frontage road
55