  • REKAPITULASIRENCANA ANGGARAN BIAYA ( RAB )

    PROVINSI : NANGGROE ACEH DARUSSALAM

    KABUPATEN : BIREUEN

    KEGIATAN : PEMBANGUNAN RUMAH TYPE 75

    PEKERJAAN : RENCANA PEMBANGUNAN RUMAH INSTRUKTUR

    LOKASI : KECAMATAN KUTA BLANG KABUPATEN BIREUEN

    NO. PEKERJAAN JUMLAH HARGA ( RP.)

    1 2 3I PEKERJAAN PERSIAPAN 1,600,000.00

    II PEKERJAAN PONDASI 9,000,800.00

    III PEKERJAAN BETON BERTULANG 25,754,000.00

    IV PEKERJAAN PASANGAN DAN PLASTERAN 22,269,000.00

    V PEKERJAAN LANTAI 6,703,400.00

    VI PEKERJAAN ATAP DAN PLAFOND 29,549,960.00

    VII PEKERJAAN KUSEN PINTU DAN JENDELA 13,862,000.00

    VIII PEKERJAAN PENGECATAN 8,531,450.00

    IX PEKERJAAN PENGUNCI DAN PENGANTUNG 1,807,000.00

    X PEKERJAAN INSTALASI LISTRIK 3,847,000.00

    XI PEKERJAAN SANITASI 15,300,000.00

    XII PEKERJAAN LAIN-LAIN 500,000.00

    JUMLAH 138,724,610.00 PEMBULATAN 138,724,000.00

    Terbilang : Seratus tiga puluh delapan juta tujuh ratus dua puluh empat ribu rupiah.

    TOTAL REKAPITULASI PROYEK USULAN PEMBANGUNAN GEDUNG PESANTREN KAB. BIREUEN

    PEKERJAAN PEMBANGUNAN GEDUNG PESANTREN DARUSSA'DAH KABUPATEN BIREUEN - PROPINSI NANGGROE ACEH DARUSSALAM

    PEKERJAAN : Pembangunn Gedung Pesantren Kecamatan Kuta Blang Kab. Bireuen

    LOKASI : Kulu Kuta Kec. Kuta Blang Kab. Bireuen

    A @ Rp. 138,724,000.00 B @ Rp. 417,084,000.00

    Jumlah @ Rp. 555,808,000.00

    Nilai Total Seluruh Bangunan = Dibulatkan. . @ Rp. 555,800,000.00

    Terbilang : Lima ratus lima puluh lima juta delapan ratus ribu rupiah.

    BANGUNAN RUMAH TYPE 75 ........................BANGUNAN ASRAMA ...................................

  • RENCANA ANGGARAN BIAYA ( RAB )

    No. Uraian Pekerjaan Volume Harga

    Satuan Jumlah1 2 3 4 5

    I. PEKERJAAN PERSIAPAN1 Pembersihan Lapangan ls. 600,000.00 600,000.00 2 Pengukuran dan Pemasangan Bowplank ls. 1,000,000.00 1,000,000.00

    Sub Total 1,600,000.00

    II. PEKERJAAN PONDASI1 Galian tanah pondasi menerus 64.56 m 25,000.00 1,614,000.00 2 Urugan kembali 1/4 galian 16.15 m 15,000.00 240,200.00 3 Urugan tanah bawah lantai 7.76 m 80,000.00 620,800.00 4 Urugan pasir bawah lantai 7.76 m 82,000.00 636,000.00 5 Urugan pasir bawah pondasi 3.2 m 82,000.00 262,400.00 6 Pekerjaan batu kosong 5.31 m 226,000.00 1,200,000.00 7 Pekerjaan beton pondasi batu kali 28.2 m 157,000.00 4,427,400.00

    Sub Total 9,000,800.00

    III. PEKERJAAN BETON BERTULANG1 Beton sloof 1.77 m 3,400,000.00 6,018,000.00 2 Beton balok konsul 2.07 m 3,400,000.00 7,038,000.00 3 Beton kolom induk 1.2 m 3,400,000.00 4,800,000.00 4 Beton reng balok 1.77 m 3,400,000.00 6,018,000.00 5 Kuda - kuda beton bertulang 0.32 m 3,400,000.00 1,880,000.00

    Sub Total 25,754,000.00

    IV. PEKERJAAN PASANGAN DAN PLASTERAN1 Pasangan batu bata 1:2 47.2 m 67,000.00 3,162,400.00 2 Pasangan batu bata 1:4 160.3 m 60,000.00 9,618,000.00 3 Plasteran dinding 1:2 94.4 m 22,000.00 2,076,800.00 4 Plasteran dinding 1:4 320.6 m 20,000.00 6,412,000.00

    Sub Total 22,269,000.00

    V. PEKERJAAN LANTAI1 Lantai keramik 30 x 30 72.2 m 83,000.00 5,992,600.00 2 Lantai keramik 20 x 20 5.46 m 130,000.00 709,800.00

    Sub Total 6,702,400.00

    VI. PEKERJAANATAP DAN PLAFOND1 Kayu kuda - kuda / gording 13.575 m 101,484.38 1,377,650.39 2 Atap multi roof 103.153 m 92,058.75 9,496,090.21 3 Baut kuda - kuda 27.158 m 33,166.00 900,705.65 4 List plank papan 211.700 m 29,077.50 6,155,706.75 5 Plafond triplek 52.262 m 181,396.88 9,480,095.46 6 Rangka plafond 2.970 m 221,807.75 658,852.20

    Sub Total Err:522

    VII. PEKERJAAN KOSEN PINTU JENDELA1 Kayu kosen pintu jendela 1.07 m 5,600,000.00 5,992,000.00 2 Pintu panel kayu 7 bh 400,000.00 2,800,000.00 3 Jendela panel kaca 17 bh 170,000.00 2,890,000.00 4 Pintu panel buka dua pakai kaca 1 bh 500,000.00 500,000.00 5 Ventilasi dan jelusi kaca 21 bh 80,000.00 1,680,000.00

    Sub Total 13,862,000.00

    VIII. PEKERJAAN PENGECATAN1 Cat Kosen / pintu, jendela, listplank, dll 36.50 m 22,300.00 813,950.00 2 Cat dinding tembok 415 m 15,000.00 6,225,000.00 3 Cat plafond 72.2 m 15,000.00 1,083,000.00 4 Cat balok konsul 20.7 m 15,000.00 310,500.00 5 Residu kuda - kuda ls 100,000.00 100,000.00

    Sub Total 8,532,450.00

    IX. PEKERJAAN PENGUNCI DAN PENGANTUNG1 Kunci tanam 2 slag 9 bh 95,000.00 855,000.00 2 Engsel pintu 20 bh 20,000.00 400,000.00 3 Engsel jendela 34 bh 15,000.00 510,000.00 4 Pacok jendela 7 bh 3,000.00 21,000.00 5 Grendel jendela 7 bh 3,000.00 21,000.00

    Sub Total 1,807,000.00

    X. PEKERJAAN INSTALASI LISTRIK1 Biaya penyambungan baru 4 amper ls 2,000,000.00 2,000,000.00 2 Box zekering 1 bh 85,000.00 85,000.00 3 Saklar ganda setara broco 2 bh 25,500.00 51,000.00 4 Lampu philip 25 watt 10 bh 42,000.00 420,000.00 5 Kabel dan pipa sharing ls 500,000.00 500,000.00 6 Induk lampu tanam 10 bh 50,000.00 500,000.00 7 Lampu TL 40 watt 2 bh 85,500.00 171,000.00

    Sub Total 3,727,000.00

  • No. Uraian Pekerjaan Volume Harga

    Satuan Jumlah1 2 3 4 5

    XI. PEKERJAAN SANITASI1 Pas instalasi air 10 ttk 150,000.00 1,500,000.00 2 Pas kran air 5 bh 30,000.00 150,000.00 3 Pas kran wastafel 3 bh 50,000.00 150,000.00 4 Pemasangan pipa pembuangan air bak 3 bh 15,000.00 45,000.00 5 Pas saringan kamar mandi 3 bh 20,000.00 60,000.00 6 Tempat sabun keramik 3 bh 125,000.00 375,000.00 7 Pas kloset jongkok keramik 2 bh 160,000.00 320,000.00 8 10 M 45,000.00 450,000.00 9 10 M 55,000.00 550,000.00

    10 Westafel 2 bh 850,000.00 1,700,000.00 11 Septictank 2 unit 5,000,000.00 10000000

    Sub Total 15,300,000.00

    Pas pipa 3 inci + acsesorisPas pipa 4 inci + acsesoris

  • ANALISA RENCANA ANGGARAN BIAYA

    1 An.Suplemen 5.aAnalisa Pekerjaan Rangka Kuda-Kuda

    Type K 1 ( baja ringan )Bj. R.C 74.34,34.0.75 = 21.298 m1 @ Rp. 24,500.00 Rp 521,801.00 Sekrup = 30.000 bh @ Rp. 950.00 Rp 28,500.00 Kepala tk. Besi = 0.038 org @ Rp. 67,500.00 Rp 2,531.25 Tk. Besi = 0.375 org @ Rp. 60,000.00 Rp 22,500.00 Pekerja = 1.500 org @ Rp. 43,000.00 Rp 64,500.00 Mandor = 0.075 org @ Rp. 48,000.00 Rp 3,600.00 Total Analisa Pekerjaan Rangka Kuda-Kuda Type K1/bh jumlah Rp. 643,432.25

    2 An.Suplemen 5.bAnalisa Pekerjaan Rangka Kuda-Kuda

    Type K 2 ( baja ringan )Bj. R.C 74.34,34.0.75 = 17.1 m1 @ Rp. 24,500.00 Rp 417,970.00 Sekrup = 12 bh @ Rp. 950.00 Rp 11,400.00 Kepala tk. Besi = 0.038 org @ Rp. 67,500.00 Rp 2,531.25 Tk. Besi = 0.375 org @ Rp. 60,000.00 Rp 22,500.00 Pekerja = 1.500 org @ Rp. 43,000.00 Rp 64,500.00 Mandor = 0.075 org @ Rp. 48,000.00 Rp 3,600.00 Total Analisa Pekerjaan Rangka Kuda-Kuda Type K2/bh jumlah Rp. 522,501.25

    3 An.Suplemen 5.cAnalisa Pekerjaan Rangka Kuda-Kuda

    Type K 3 ( baja ringan )Bj. R.C 74.34,34.0.75 = 11.4 m1 @ Rp. 24,500.00 Rp 279,545.00 Sekrup = 18 bh @ Rp. 950.00 Rp 17,100.00 Kepala tk. Besi = 0.038 org @ Rp. 67,500.00 Rp 2,531.25 Tk. Besi = 0.375 org @ Rp. 60,000.00 Rp 22,500.00 Pekerja = 1.500 org @ Rp. 43,000.00 Rp 64,500.00 Mandor = 0.075 org @ Rp. 48,000.00 Rp 3,600.00 Total Analisa Pekerjaan Rangka Kuda-Kuda Type K2/bh jumlah Rp. 389,776.25

    4 An.Suplemen 5.dAnalisa Pekerjaan Rangka Kuda-Kuda

    Type K 4 ( baja ringan )Bj. R.C 74.34,34.0.75 = 6.1 m1 @ Rp. 24,500.00 Rp 150,626.00 Sekrup = 15 bh @ Rp. 950.00 Rp 14,250.00 Kepala tk. Besi = 0.038 org @ Rp. 67,500.00 Rp 2,531.25 Tk. Besi = 0.375 org @ Rp. 60,000.00 Rp 22,500.00 Pekerja = 1.500 org @ Rp. 43,000.00 Rp 64,500.00 Mandor = 0.075 org @ Rp. 48,000.00 Rp 3,600.00 Total Analisa Pekerjaan Rangka Kuda-Kuda Type K4/bh jumlah Rp. 258,007.25

    5 An.Suplemen 6Analisa Pekerjaan Gording Baja Ringan/m2

    Gording 'Bj.Fs.Zc.50 / 4-4, = 3 m1 @ Rp. 19,500.00 Rp 58,500.00 Sekrup = 6 bh @ Rp. 850.00 Rp 5,100.00 Kepala tk. Besi = 0.011 org @ Rp. 67,500.00 Rp 742.50 Tk. Besi = 0.110 org @ Rp. 60,000.00 Rp 6,600.00 Pekerja = 0.100 org @ Rp. 43,000.00 Rp 4,300.00 Mandor = 0.005 org @ Rp. 48,000.00 Rp 240.00

  • Analisa Pekerjaan Gording Baja Ringan/m2 jumlah Rp. 75,482.50

  • 6 An.Suplemen 7 Analisa Pekerjaan Pasang Lisplank Flashing lbr.20 cm/m

    Flashing fc.Az.55 w / 4-45 t = 0.30mm = 1.000 m1 @ Rp. 26,500.00 Rp 26,500.00 Paku Zincalum = 0.150 bh @ Rp. 1,000.00 Rp 150.00 Kepala tk. Besi = 0.012 org @ Rp. 67,500.00 Rp 810.00 Tk. Besi = 0.120 org @ Rp. 60,000.00 Rp 7,200.00 Pekerja = 0.110 org @ Rp. 43,000.00 Rp 4,730.00 Mandor = 0.006 org @ Rp. 48,000.00 Rp 264.00 Total Analisa Pekerjaan Pasang Lisplank Flashing lbr.20 cm/m jumlah Rp. 39,654.00

    7 An.H.8Analisa Pekerjaan Atap Zincalum T= 0,30mm/m2 atau yang setara

    Atap zincalum t= 0.30 mm = 1 m2 @ Rp. 85,000.00 Rp 85,000.00 Paku Zincalum = 9 bh @ Rp. 1,000.00 Rp 9,000.00 Kepala tk. Besi = 0.005 org @ Rp. 67,500.00 Rp 337.50 Tk. Besi = 0.050 org @ Rp. 60,000.00 Rp 3,000.00 Pekerja = 0.100 org @ Rp. 43,000.00 Rp 4,300.00 Mandor = 0.005 org @ Rp. 48,000.00 Rp 240.00 Total Analisa Pekerjaan Atap Zincalum T= 0,30mm/m2 atau yang setara jumlah Rp. 101,877.50

    8 An.H.9ANALISA PEKERJAAN BUBUNGAN ZINGCALUMAnalisa Pekerjaan Pasang Bubungan Zincalum T=0,3mm/m

    Nok atap zincalum t = 0.30mm = 1 m1 @ Rp. 25,500.00 Rp 25,500.00 Paku Zincalum = 6 kg @ Rp. 1,000.00 Rp 6,000.00 Kepala tk. kayu = 0.005 org @ Rp. 67,500.00 Rp 337.50 Tk. kayu = 0.050 org @ Rp. 60,000.00 Rp 3,000.00 Pekerja = 0.100 org @ Rp. 43,000.00 Rp 4,300.00 Mandor = 0.005 org @ Rp. 48,000.00 Rp 240.00 Total Analisa Pekerjaan Pasang Bubungan Zincalum T=0,3mm/m jumlah Rp. 39,377.50

  • ANALISA RENCANA ANGGARAN BIAYA

    1 SNI 03-2835-2002 - 2 - a

    Tenaga- Pekerja 0.400 Oh x Rp. 43,000.00 = Rp. 17,200.00- Tukang Gali 0.000 Oh x Rp. 67,500.00 = Rp. 0.00- Kepala Tukang 0.000 Oh x Rp. 67,500.00 = Rp. 0.00- Mandor 0.040 Oh x Rp. 48,000.00 = Rp. 1,920.00

    Jumlah = Rp. 19,120.00

    2 SNI 03-2835-2002 - 2 - i

    Tenaga- Pekerja 0.192 Oh x Rp. 43,000.00 = Rp. 8,256.00- Tukang Gali 0.000 Oh x Rp. 67,500.00 = Rp. 0.00- Kepala Tukang 0.000 Oh x Rp. 67,500.00 = Rp. 0.00- Mandor 0.019 Oh x Rp. 48,000.00 = Rp. 912.00

    Jumlah = Rp. 9,168.00

    3 SNI 03-2835-2002 - 2 - j

    Bahan- Tanah Timbun 1.200 x Rp. 75,000.00 = Rp. 90,000.00

    Jumlah (1) = Rp. 90,000.00

    - Pekerja 0.500 Oh x Rp. 43,000.00 = Rp. 21,500.00- Tukang Gali 0.000 Oh x Rp. 67,500.00 = Rp. 0.00- Kepala Tukang 0.000 Oh x Rp. 67,500.00 = Rp. 0.00- Mandor 0.050 Oh x Rp. 48,000.00 = Rp. 2,400.00

    Jumlah = Rp. 23,900.00Jumlah (1) + (2) = Rp. 113,900.00

    4 SNI 03-2835-2002 - 2 - k

    Bahan- Pasir urug 1.200 x Rp. 85,000.00 = Rp. 102,000.00

    Jumlah (1) = Rp. 102,000.00Tenaga- Pekerja 0.300 Oh x Rp. 43,000.00 = Rp. 12,900.00- Tukang Gali 0.000 Oh x Rp. 67,500.00 = Rp. 0.00- Kepala Tukang 0.000 Oh x Rp. 67,500.00 = Rp. 0.00- Mandor 0.010 Oh x Rp. 48,000.00 = Rp. 480.00

    Jumlah (2) = Rp. 13,380.00Jumlah (1) + (2) = Rp. 115,380.00

    5 SNI 03-2836-2002 - d

    Bahan- Batu Kali/Gunung 1.100 x Rp. 165,000.00 = Rp. 181,500.00- Semen Portland 202.000 Kg x Rp. 1,362.50 = Rp. 275,225.00- Pasir Pasang 0.485 x Rp. 145,000.00 = Rp. 70,325.00

    Jumlah (1) = Rp. 527,050.00Tenaga- Pekerja 1.500 Oh x Rp. 43,000.00 = Rp. 64,500.00- Tukang Batu 0.600 Oh x Rp. 60,000.00 = Rp. 36,000.00- Kepala Tukang 0.060 Oh x Rp. 67,500.00 = Rp. 4,050.00- Mandor 0.075 Oh x Rp. 48,000.00 = Rp. 3,600.00

    Jumlah (2) = Rp. 108,150.00Jumlah (1) + (2) = Rp. 635,200.00

    1 M3 Galian tanah biasa sedalam 1 meter

    1 M3 Urugan kembali

    1 M3 Timbunan & Pemadatan Tanah

    M3

    1 M3 Urugan pasir

    M3

    1 M3 Pasang pondasi batu kali, 1 Pc : 3 Ps

    M3

    M3

  • 6 SNI 03-2836-2002 - n

    Bahan- Batu Kali/Gunung 1.200 x Rp. 165,000.00 = Rp. 198,000.00- Pasir urug 0.300 x Rp. 85,000.00 = Rp. 25,500.00

    Jumlah (1) = Rp. 223,500.00Tenaga- Pekerja 0.780 Oh x Rp. 43,000.00 = Rp. 33,540.00- Tukang Batu 0.390 Oh x Rp. 60,000.00 = Rp. 23,400.00- Kepala Tukang 0.039 Oh x Rp. 67,500.00 = Rp. 2,632.50- Mandor 0.039 Oh x Rp. 48,000.00 = Rp. 1,872.00

    Jumlah (2) = Rp. 61,444.50Jumlah (1) + (2) = Rp. 284,944.50

    7 SNI 03-2837-2002 - 1 - b

    Bahan- Batu Bata 140.000 Bh x Rp. 700.00 = Rp. 98,000.00- Semen portland 43.500 Kg x Rp. 1,362.50 = Rp. 59,268.75- Pasir pasang 0.080 x Rp. 145,000.00 = Rp. 11,600.00

    Jumlah (1) = Rp. 168,868.75Tenaga- Pekerja 0.650 Oh x Rp. 43,000.00 = Rp. 27,950.00- Tukang Batu 0.200 Oh x Rp. 60,000.00 = Rp. 12,000.00- Kepala Tukang 0.020 Oh x Rp. 67,500.00 = Rp. 1,350.00- Mandor 0.030 Oh x Rp. 48,000.00 = Rp. 1,440.00

    Jumlah (2) = Rp. 42,740.00Jumlah (1) + (2) = Rp. 211,608.75

    8 SNI 03-2837-2002 - 1 - i

    Bahan- Batu Bata 70.000 Bh x Rp. 700.00 = Rp. 49,000.00- Semen portland 18.950 Kg x Rp. 1,362.50 = Rp. 25,819.38- Pasir pasang 0.038 x Rp. 145,000.00 = Rp. 5,510.00

    Jumlah (1) = Rp. 80,329.38Tenaga- Pekerja 0.320 Oh x Rp. 43,000.00 = Rp. 13,760.00- Tukang Batu 0.100 Oh x Rp. 60,000.00 = Rp. 6,000.00- Kepala Tukang 0.010 Oh x Rp. 67,500.00 = Rp. 675.00- Mandor 0.015 Oh x Rp. 48,000.00 = Rp. 720.00

    Jumlah (2) = Rp. 21,155.00Jumlah (1) + (2) = Rp. 101,484.38

    9 SNI 03-2837-2002 - 1 - k

    Bahan- Batu Bata 70.000 Bh x Rp. 700.00 = Rp. 49,000.00- Semen portland 11.500 Kg x Rp. 1,362.50 = Rp. 15,668.75- Pasir pasang 0.043 x Rp. 145,000.00 = Rp. 6,235.00

    Jumlah (1) = Rp. 70,903.75Tenaga- Pekerja 0.320 Oh x Rp. 43,000.00 = Rp. 13,760.00- Tukang Batu 0.100 Oh x Rp. 60,000.00 = Rp. 6,000.00- Kepala Tukang 0.010 Oh x Rp. 67,500.00 = Rp. 675.00- Mandor 0.015 Oh x Rp. 48,000.00 = Rp. 720.00

    Jumlah (2) = Rp. 21,155.00Jumlah (1) + (2) = Rp. 92,058.75

    1 M3 Pasang pondasi batu kosong

    M3

    M3

    1 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps

    M3

    1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps

    M3

    1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps

    M3

  • 10 SNI 03-2837-2002 - 2- b

    Bahan- Semen portland 8.520 Kg x Rp. 1,362.50 = Rp. 11,608.50- Pasir pasang 0.017 x Rp. 145,000.00 = Rp. 2,465.00

    Jumlah (1) = Rp. 14,073.50

    Tenaga- Pekerja 0.200 Oh x Rp. 43,000.00 = Rp. 8,600.00- Tukang Batu 0.150 Oh x Rp. 60,000.00 = Rp. 9,000.00- Kepala Tukang 0.015 Oh x Rp. 67,500.00 = Rp. 1,012.50- Mandor 0.010 Oh x Rp. 48,000.00 = Rp. 480.00

    Jumlah (2) = Rp. 19,092.50Jumlah (1) + (2) = Rp. 33,166.00

    11 SNI 03-2837-2002 - 2- d

    Bahan- Semen portland 5.200 Kg x Rp. 1,362.50 = Rp. 7,085.00- Pasir pasang 0.02 x Rp. 145,000.00 = Rp. 2,900.00

    Jumlah (1) = Rp. 9,985.00

    Tenaga- Pekerja 0.200 Oh x Rp. 43,000.00 = Rp. 8,600.00- Tukang Batu 0.150 Oh x Rp. 60,000.00 = Rp. 9,000.00- Kepala Tukang 0.015 Oh x Rp. 67,500.00 = Rp. 1,012.50- Mandor 0.010 Oh x Rp. 48,000.00 = Rp. 480.00

    Jumlah (2) = Rp. 19,092.50Jumlah (1) + (2) = Rp. 29,077.50

    12 SNI 03-3434-2002 - b

    Bahan- Kayu Klas II, balok 1.200 x Rp. 3,750,000.00 = Rp. 4,500,000.00

    Jumlah (1) = Rp. 4,500,000.00

    Tenaga- Pekerja 6.000 Oh x Rp. 43,000.00 = Rp. 258,000.00- Tukang Kayu 18.000 Oh x Rp. 60,000.00 = Rp. 1,080,000.00- Kepala Tukang 2.000 Oh x Rp. 67,500.00 = Rp. 135,000.00- Mandor 0.300 Oh x Rp. 48,000.00 = Rp. 14,400.00

    Jumlah (2) = Rp. 1,487,400.00Jumlah (1) + (2) = Rp. 5,987,400.00

    13 SNI 03-3434-2002 - an1 M Pasang rangka langit-langit (1,00 x 1,00) m, kayu Klas IIIBahan- Kayu klas III, balok 0.012 x Rp. 2,800,000.00 = Rp. 33,600.00- Paku biasa 2" - 5" 0.100 Kg x Rp. 14,500.00 = Rp. 1,450.00

    Jumlah (1) = Rp. 35,050.00

    Tenaga- Pekerja 0.150 Oh x Rp. 43,000.00 = Rp. 6,450.00- Tukang Kayu 0.250 Oh x Rp. 60,000.00 = Rp. 15,000.00- Kepala Tukang 0.025 Oh x Rp. 67,500.00 = Rp. 1,687.50- Mandor 0.075 Oh x Rp. 48,000.00 = Rp. 3,600.00

    Jumlah (2) = Rp. 26,737.50Jumlah (1) + (2) = Rp. 61,787.50

    1 M2 Plesteran 1 Pc : 2 Ps, tebal 15 mm

    M3

    1 M2 Plesteran 1 Pc : 4 Ps, tebal 15 mm

    M3

    1 M Pasang kusen pintu dan jendela kayu Klas II

    M3

    M3

  • 14 Analisa biaya konstruksi pekerjaan betonSNI 03-3435-2002 - a1 M Membuat beton tumbuk, 1 Pc : 3 Ps : 5 KrBahan- Semen portland 218.000 Kg x Rp. 1,362.50 = Rp. 297,025.00- Pasir beton 0.520 M x Rp. 145,000.00 = Rp. 75,400.00- Koral beton 0.870 M x Rp. 145,000.00 = Rp. 126,150.00

    Jumlah (1) = Rp. 498,575.00

    Tenaga- Pekerja 1.650 Oh x Rp. 43,000.00 = Rp. 70,950.00- Tukang Batu 0.250 Oh x Rp. 60,000.00 = Rp. 15,000.00- Kepala Tukang 0.025 Oh x Rp. 67,500.00 = Rp. 1,687.50- Mandor 0.080 Oh x Rp. 48,000.00 = Rp. 3,840.00

    Jumlah (2) = Rp. 91,477.50Jumlah (1) + (2) = Rp. 590,052.50

    15 SNI 03-3435-2002 - d1 M Membuat lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 KrBahan- Semen portland 10.000 Kg x Rp. 1,362.50 = Rp. 13,625.00- Pasir beton 0.026 M x Rp. 145,000.00 = Rp. 3,770.00- Koral beton 0.044 M x Rp. 120,000.00 = Rp. 5,280.00

    Jumlah (1) = Rp. 22,675.00

    Tenaga- Pekerja 1.150 Oh x Rp. 43,000.00 = Rp. 49,450.00- Tukang Batu 0.020 Oh x Rp. 60,000.00 = Rp. 1,200.00- Kepala Tukang 0.002 Oh x Rp. 67,500.00 = Rp. 135.00- Mandor 0.006 Oh x Rp. 48,000.00 = Rp. 288.00

    Jumlah (2) = Rp. 51,073.00Jumlah (1) + (2) = Rp. 73,748.00

    16 SNI 03-3435-2002 - ai1 M Membuat beton cor 1 : 2 : 3Bahan- Semen portland 232.000 Kg x Rp. 1,362.50 = Rp. 316,100.00- Pasir beton 0.520 M x Rp. 145,000.00 = Rp. 75,400.00- Koral beton 0.780 M x Rp. 120,000.00 = Rp. 93,600.00

    Jumlah (1) = Rp. 485,100.00

    Tenaga- Pekerja 1.650 Oh x Rp. 43,000.00 = Rp. 70,950.00- Tukang Batu 0.250 Oh x Rp. 60,000.00 = Rp. 15,000.00- Kepala tukang 0.025 Oh x Rp. 67,500.00 = Rp. 1,687.50- Mandor 0.080 Oh x Rp. 48,000.00 = Rp. 3,840.00

    Jumlah (2) = Rp. 91,477.50Jumlah (1) + (2) = Rp. 576,577.50

    17 SNI 03-3435-2002 - y1 Kg Pembesian dengan besi polos atau besi ulirBahan- Besi beton (polos) 1.050 Kg x Rp. 14,500.00 = Rp. 15,225.00- Kawat beton 0.015 Kg x Rp. 16,500.00 = Rp. 247.50

    Jumlah (1) = Rp. 15,472.50

    Tenaga- Pekerja 0.007 Oh x Rp. 43,000.00 = Rp. 301.00- Tukang Besi 0.007 Oh x Rp. 60,000.00 = Rp. 420.00- Kepala tukang 0.0007 Oh x Rp. 67,500.00 = Rp. 47.25- Mandor 0.0003 Oh x Rp. 48,000.00 = Rp. 14.40

    Jumlah (2) = Rp. 782.65Jumlah (1) + (2) = Rp. 16,255.15

  • 18 SNI 03-3435-2002 - ab1 M Pasang bekisting untuk pondasiBahan- Kayu bekisting 0.040 M x Rp. 1,800,000.00 = Rp. 72,000.00- Paku biasa 2" - 5" 0.300 Kg x Rp. 14,500.00 = Rp. 4,350.00- Minyak bekisting 0.100 Lt x Rp. 9,500.00 = Rp. 950.00

    Jumlah (1) = Rp. 77,300.00Tenaga- Pekerja 0.300 Oh x Rp. 43,000.00 = Rp. 12,900.00- Tukang Kayu 0.260 Oh x Rp. 60,000.00 = Rp. 15,600.00- Kepala tukang 0.026 Oh x Rp. 67,500.00 = Rp. 1,755.00- Mandor 0.005 Oh x Rp. 48,000.00 = Rp. 240.00

    Jumlah (2) = Rp. 30,495.00Jumlah (1) + (2) = Rp. 107,795.00

    - Asumsi 4 kali pemakaian bekisting 1/4 x ( 1 + 2 ) = Rp. 26,948.75

    19 SNI 03-3435-2002 - ac1 M Pasang bekisting untuk sloofBahan- Kayu terentang 0.045 M x Rp. 1,800,000.00 = Rp. 81,000.00- Paku biasa 2" - 5" 0.300 Kg x Rp. 14,500.00 = Rp. 4,350.00- Minyak bekisting 0.100 Lt x Rp. 9,500.00 = Rp. 950.00

    Jumlah (1) = Rp. 86,300.00

    Tenaga- Pekerja 0.300 Oh x Rp. 43,000.00 = Rp. 12,900.00- Tukang Kayu 0.260 Oh x Rp. 60,000.00 = Rp. 15,600.00- Kepala tukang 0.026 Oh x Rp. 67,500.00 = Rp. 1,755.00- Mandor 0.005 Oh x Rp. 48,000.00 = Rp. 240.00

    Jumlah (2) = Rp. 30,495.00Jumlah (1) + (2) = Rp. 116,795.00

    - Asumsi 4 kali pemakaian bekisting 1/4 x ( 1 + 2 ) = Rp. 29,198.75

    20 SNI 03-3435-2002 - ad1 M Pasang bekisting untuk kolomBahan- Kayu terentang 0.040 M x Rp. 1,800,000.00 = Rp. 72,000.00- Paku biasa 2" - 5" 0.400 Kg x Rp. 14,500.00 = Rp. 5,800.00- Minyak bekisting 0.200 Lt x Rp. 9,500.00 = Rp. 1,900.00- Balok kayu borneo 0.015 M x Rp. 3,450,000.00 = Rp. 51,750.00- Plywood tebal 9 mm 0.350 Lbr x Rp. 95,000.00 = Rp. 33,250.00- Dolken kayu 8 - 10/4 m 2.000 Btg x Rp. 17,500.00 = Rp. 35,000.00

    Jumlah (1) = Rp. 199,700.00

    Tenaga- Pekerja 0.300 Oh x Rp. 43,000.00 = Rp. 12,900.00- Tukang Kayu 0.330 Oh x Rp. 60,000.00 = Rp. 19,800.00- Kepala tukang 0.033 Oh x Rp. 67,500.00 = Rp. 2,227.50- Mandor 0.006 Oh x Rp. 48,000.00 = Rp. 288.00

    Jumlah (2) = Rp. 35,215.50Jumlah (1) + (2) = Rp. 234,915.50

    - Asumsi 4 kali pemakaian bekisting 1/4 x ( 1 + 2 ) = Rp. 58,728.88

  • 21 SNI 03-3435-2002 - ae1 M Pasang bekisting untuk balokBahan- Kayu terentang 0.040 M x Rp. 1,800,000.00 = Rp. 72,000.00- Paku biasa 2" - 5" 0.400 Kg x Rp. 14,500.00 = Rp. 5,800.00- Minyak bekisting 0.200 Lt x Rp. 9,500.00 = Rp. 1,900.00- Balok kayu borneo 0.018 M x Rp. 3,450,000.00 = Rp. 62,100.00- Plywood tebal 9 mm 0.350 Lbr x Rp. 95,000.00 = Rp. 33,250.00- Dolken kayu 8 - 10/4 m 2.000 Btg x Rp. 17,500.00 = Rp. 35,000.00

    Jumlah (1) = Rp. 210,050.00

    Tenaga- Pekerja 0.320 Oh x Rp. 43,000.00 = Rp. 13,760.00- Tukang Kayu 0.330 Oh x Rp. 60,000.00 = Rp. 19,800.00- Kepala tukang 0.033 Oh x Rp. 67,500.00 = Rp. 2,227.50- Mandor 0.006 Oh x Rp. 48,000.00 = Rp. 288.00

    Jumlah (2) = Rp. 36,075.50Jumlah (1) + (2) = Rp. 246,125.50

    - Asumsi 4 kali pemakaian bekisting 1/4 x ( 1 + 2 ) = Rp. 61,531.38

    22 SNI 03-3435-2002 - af1 M Pasang bekisting untuk lantaiBahan- Kayu terentang 0.040 M x Rp. 1,800,000.00 = Rp. 72,000.00- Paku biasa 2" - 5" 0.400 Kg x Rp. 14,500.00 = Rp. 5,800.00- Minyak bekisting 0.200 Lt x Rp. 9,500.00 = Rp. 1,900.00- Balok kayu borneo 0.015 M x Rp. 2200000.00 = Rp. 33,000.00- Plywood tebal 9 mm 0.350 Lbr x Rp. 90,000.00 = Rp. 31,500.00- Dolken kayu 8 - 10/4 m 6.000 Btg x Rp. 17,500.00 = Rp. 105,000.00

    Jumlah (1) = Rp. 249,200.00

    Tenaga- Pekerja 0.320 Oh x Rp. 43,000.00 = Rp. 13,760.00- Tukang Kayu 0.330 Oh x Rp. 60,000.00 = Rp. 19,800.00- Kepala tukang 0.033 Oh x Rp. 67,500.00 = Rp. 2,227.50- Mandor 0.006 Oh x Rp. 48,000.00 = Rp. 288.00

    Jumlah (2) = Rp. 36,075.50Jumlah (1) + (2) = Rp. 285,275.50

    - Asumsi 4 kali pemakaian bekisting 1/4 x ( 1 + 2 ) = Rp. 71,318.88

    Pekerjaan lain-lainUntuk membongkar cetakan dan menyiram beton diperlukan- Pekerja 4.000 Oh x Rp. 43,000.00 = Rp. 172,000.00

    Jumlah (1) = Rp. 172,000.0023 SUPLEMEN SNI 03-3435-2002 a

    Beton Cor 1: 2 : 3 1.000 M x Rp. 576,577.50 = Rp. 576,577.50Pekerjaan Besi 172.403 Kg x Rp. 16,255.15 = Rp. 2,802,430.00Cetakan Beton 13.379 x Rp. 29,198.75 = Rp. 390,654.94Pekerjan lain-lain 1.000 Oh x Rp. 172,000.00 = Rp. 172,000.00

    Jumlah = Rp. 3,941,662.45

    24 SUPLEMEN SNI 03-3435-2002 b

    Beton Cor 1: 2 : 3 1.000 M x Rp. 576,577.50 = Rp. 576,577.50Pekerjaan Besi 284.044 Kg x Rp. 16,255.15 = Rp. 4,617,173.30Cetakan Beton 15.442 x Rp. 29,198.75 = Rp. 450,896.08Pekerjan lain-lain 1.000 Oh x Rp. 172,000.00 = Rp. 172,000.00

    Jumlah = Rp. 5,816,646.8825 SUPLEMEN SNI 03-3435-2002 c

    Beton Cor 1: 2 : 3 1.000 M x Rp. 576,577.50 = Rp. 576,577.50Pekerjaan Besi 223.761 Kg x Rp. 16,255.15 = Rp. 3,637,272.67Cetakan Beton 26.670 x Rp. 58,728.88 = Rp. 1,566,270.22Pekerjan lain-lain 1.000 Oh x Rp. 172,000.00 = Rp. 172,000.00

    Jumlah = Rp. 5,952,120.39

    1 M3 Sloof Ukuran 15 x 20 cm

    M2

    1 M3 Sloof Ukuran 13 x 13 cm

    M2

    1 M3 Kolom 15/15 cm

    M2

  • 26 SUPLEMEN SNI 03-3435-2002 d

    Beton Cor 1: 2 : 3 1.000 M x Rp. 576,577.50 = Rp. 576,577.50Pekerjaan Besi 291.185 Kg x Rp. 16,255.15 = Rp. 4,733,262.43Cetakan Beton 15.442 x Rp. 58,728.88 = Rp. 906,909.36Pekerjan lain-lain 1.000 Oh x Rp. 172,000.00 = Rp. 172,000.00

    Jumlah 6,388,749.2827 SUPLEMEN SNI 03-3435-2002 e

    Beton Cor 1: 2 : 3 1.000 M x Rp. 576,577.50 = Rp. 576,577.50Pekerjaan Besi 291.810 Kg x Rp. 16,255.15 = Rp. 4,743,408.48Cetakan Beton 15.423 x Rp. 61,531.38 = Rp. 949,003.13Pekerjan lain-lain 1.000 Oh x Rp. 172,000.00 = Rp. 172,000.00

    Jumlah = Rp. 6,440,989.1128 SUPLEMEN SNI 03-3435-2002 f

    1 M3 Ring Balk 13/13 cmBeton Cor 1: 2 : 3 1.000 M x Rp. 576,577.50 = Rp. 576,577.50Pekerjaan Besi 291.39 Kg x Rp. 16,255.15 = Rp. 4,736,536.57Cetakan Beton 15.42 x Rp. 61,531.38 = Rp. 949,003.13Pekerjan lain-lain 1.000 Oh x Rp. 172,000.00 = Rp. 172,000.00

    Jumlah = Rp. 6,434,117.20

    29 SNI 03-2838-2002- 1 - j1 M Langit-langit Triplek/plywood Tebal 4 mmBahan- Triplek (120 x 240 x 4) mm 0.375 Lbr x Rp. 65,000.00 = Rp. 24,375.00- Paku Sekrup 0.030 Kg x Rp. 950.00 = Rp. 28.50

    Jumlah (1) = Rp. 24,403.50

    Tenaga- Pekerja 0.070 Oh x Rp. 43,000.00 = Rp. 3,010.00- Tukang Kayu 0.100 Oh x Rp. 60,000.00 = Rp. 6,000.00- Kepala tukang 0.010 Oh x Rp. 67,500.00 = Rp. 675.00- Mandor 0.0035 Oh x Rp. 48,000.00 = Rp. 168.00

    Jumlah (2) = Rp. 9,853.00Jumlah (1) + (2) = Rp. 34,256.50

    30 SNI 03-2838-2002- 2 - y Memasang 1 m pipa PVC tipe AW diameter 2"Bahan- Pipa PVC 1.200 M x Rp. 11,000.00 = Rp. 13,200.00- Perlengkapan 35.0 % x Rp. 11,000.00 = Rp. 3,850.00

    Jumlah (1) = Rp. 17,050.00

    Tenaga- Pekerja 0.081 Oh x Rp. 43,000.00 = Rp. 3,483.00- Tukang Batu 0.180 Oh x Rp. 60,000.00 = Rp. 10,800.00- Kepala tukang 0.0180 Oh x Rp. 67,500.00 = Rp. 1,215.00- Mandor 0.0041 Oh x Rp. 48,000.00 = Rp. 196.80

    Jumlah (2) = Rp. 15,694.80Jumlah (1) + (2) = Rp. 32,744.80

    31 SNI 03-2838-2002- 2 - ab Memasang 1 m pipa PVC tipe AW diameter 4"Bahan- Pipa PVC 1.200 M x Rp. 11,000.00 = Rp. 13,200.00- Perlengkapan 35.0 % x Rp. 11,000.00 = Rp. 3,850.00

    Jumlah (1) = Rp. 17,050.00

    Tenaga- Pekerja 0.135 Oh x Rp. 43,000.00 = Rp. 5,805.00- Tukang Batu 0.225 Oh x Rp. 60,000.00 = Rp. 13,500.00- Kepala tukang 0.0225 Oh x Rp. 67,500.00 = Rp. 1,518.75- Mandor 0.0068 Oh x Rp. 48,000.00 = Rp. 326.40

    Jumlah (2) = Rp. 21,150.15

    1 M3 Kolom 13/13 cm

    M2

    1 M3 Top gevel 13/15 cm

    M2

    M2

  • Jumlah (1) + (2) = Rp. 38,200.15

  • 32 SNI 03-2838-2002- 2 - ae Memasang 1 bh kran diameter " atau "Bahan- Kran air 1.000 Bh x Rp. 26,000.00 = Rp. 26,000.00- Seal teap 0.025 Set x Rp. 4,500.00 = Rp. 112.50

    Jumlah (1) = Rp. 26,112.50

    Tenaga- Pekerja 0.010 Oh x Rp. 43,000.00 = Rp. 430.00- Tukang Batu 0.100 Oh x Rp. 60,000.00 = Rp. 6,000.00- Kepala tukang 0.010 Oh x Rp. 67,500.00 = Rp. 675.00- Mandor 0.005 Oh x Rp. 48,000.00 = Rp. 240.00

    Jumlah (2) = Rp. 7,345.00Jumlah (1) + (2) = Rp. 33,457.50

    33 SNI 03-2838-2002- 2 - af Memasang 1 bh floor drainBahan- Floor drain 1.000 Bh x Rp. 17,500.00 = Rp. 17,500.00

    Jumlah (1) = Rp. 17,500.00

    Tenaga- Pekerja 0.010 Oh x Rp. 43,000.00 = Rp. 430.00- Tukang Batu 0.100 Oh x Rp. 60,000.00 = Rp. 6,000.00- Kepala tukang 0.010 Oh x Rp. 67,500.00 = Rp. 675.00- Mandor 0.005 Oh x Rp. 48,000.00 = Rp. 240.00

    Jumlah (2) = Rp. 7,345.00Jumlah (1) + (2) = Rp. 24,845.00

    34 SNI 03-2838-2002- 5 - at2 1 M Pasang lantai keramik 30 x 30 cmBahan- Keramik 30x30 cm 12.000 Bh x Rp. 7,500.00 = Rp. 90,000.00- Semen portland 14.150 Kg x Rp. 1,362.50 = Rp. 19,279.38- Pasir pasang 0.039 x Rp. 145,000.00 = Rp. 5,655.00- Semen warna 2.000 Kg x Rp. 7,500.00 = Rp. 15,000.00

    Jumlah (1) = Rp. 129,934.38

    Tenaga- Pekerja 0.620 Oh x Rp. 43,000.00 = Rp. 26,660.00- Tukang Batu 0.350 Oh x Rp. 60,000.00 = Rp. 21,000.00- Kepala tukang 0.035 Oh x Rp. 67,500.00 = Rp. 2,362.50- Mandor 0.030 Oh x Rp. 48,000.00 = Rp. 1,440.00

    Jumlah (2) = Rp. 51,462.50Jumlah (1) + (2) = Rp. 181,396.88

    35 SNI 03-2838-2002- 5 - au1 1 M Pasang lantai keramik 20 x 20 cm anti slipBahan- Keramik 20x20 cm anti slip 25.000 Bh x Rp. 5,500.00 = Rp. 137,500.00- Semen portland 11.380 Kg x Rp. 1,362.50 = Rp. 15,505.25- Pasir pasang 0.042 x Rp. 145,000.00 = Rp. 6,090.00- Semen warna 1.500 Kg x Rp. 7,500.00 = Rp. 11,250.00

    Jumlah (1) = Rp. 170,345.25

    Tenaga- Pekerja 0.620 Oh x Rp. 43,000.00 = Rp. 26,660.00- Tukang Batu 0.350 Oh x Rp. 60,000.00 = Rp. 21,000.00- Kepala tukang 0.035 Oh x Rp. 67,500.00 = Rp. 2,362.50- Mandor 0.030 Oh x Rp. 48,000.00 = Rp. 1,440.00

    Jumlah (2) = Rp. 51,462.50Jumlah (1) + (2) = Rp. 221,807.75

    M3

    M3

  • 36 SNI 03-2838-2002- 6 - h 1 M Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis penutupBahan- Cat meni 0.200 Kg x Rp. 24,500.00 = Rp. 4,900.00- Plamir 0.150 Kg x Rp. 15,500.00 = Rp. 2,325.00- Cat dasar 0.170 Kg x Rp. 15,500.00 = Rp. 2,635.00- Cat penutup 0.260 Kg x Rp. 34,500.00 = Rp. 8,970.00

    Jumlah (1) = Rp. 18,830.00

    Tenaga- Pekerja 0.070 Oh x Rp. 43,000.00 = Rp. 3,010.00- Tukang Cat 0.009 Oh x Rp. 60,000.00 = Rp. 540.00- Kepala tukang 0.006 Oh x Rp. 67,500.00 = Rp. 405.00- Mandor 0.0025 Oh x Rp. 48,000.00 = Rp. 120.00

    Jumlah (2) = Rp. 4,075.00Jumlah (1) + (2) = Rp. 22,905.00

    37 SNI 03-2838-2002- 6 - i 1 M Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis penutupBahan- Cat meni 0.200 Kg x Rp. 24,500.00 = Rp. 4,900.00- Plamir 0.150 Kg x Rp. 15,500.00 = Rp. 2,325.00- Cat dasar 0.170 Kg x Rp. 15,500.00 = Rp. 2,635.00- Cat penutup 0.350 Kg x Rp. 34,500.00 = Rp. 12,075.00

    Jumlah (1) = Rp. 21,935.00

    Tenaga- Pekerja 0.070 Oh x Rp. 43,000.00 = Rp. 3,010.00- Tukang Cat 0.105 Oh x Rp. 60,000.00 = Rp. 6,300.00- Kepala tukang 0.004 Oh x Rp. 67,500.00 = Rp. 270.00- Mandor 0.0025 Oh x Rp. 48,000.00 = Rp. 120.00

    Jumlah (2) = Rp. 9,700.00Jumlah (1) + (2) = Rp. 31,635.00

    38 SNI 03-2838-2002- 6 - n 1 M Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)Bahan- Plamir 0.100 Kg x Rp. 19,500.00 = Rp. 1,950.00- Cat dasar 0.100 Kg x Rp. 19,500.00 = Rp. 1,950.00- Cat penutup 0.260 Kg x Rp. 29,500.00 = Rp. 7,670.00

    Jumlah (1) = Rp. 11,570.00

    Tenaga- Pekerja 0.020 Oh x Rp. 43,000.00 = Rp. 860.00- Tukang Cat 0.063 Oh x Rp. 60,000.00 = Rp. 3,780.00- Kepala tukang 0.006 Oh x Rp. 67,500.00 = Rp. 425.25- Mandor 0.0025 Oh x Rp. 48,000.00 = Rp. 120.00

    Jumlah (2) = Rp. 5,185.25Jumlah (1) + (2) = Rp. 16,755.25

  • 39 SNI 03-2838-2002- 6 - t1 1 M Pengecatan meni Bahan- Cat meni besi 0.100 Kg x Rp. 24,500.00 = Rp. 2,450.00- Kuas 0.010 Bh x Rp. 6,500.00 = Rp. 65.00

    Jumlah (1) = Rp. 2,515.00

    Tenaga- Pekerja 0.020 Oh x Rp. 43,000.00 = Rp. 860.00- Tukang Cat 0.200 Oh x Rp. 60,000.00 = Rp. 12,000.00- Kepala tukang 0.020 Oh x Rp. 67,500.00 = Rp. 1,350.00- Mandor 0.010 Oh x Rp. 48,000.00 = Rp. 480.00

    Jumlah (2) = Rp. 14,690.00Jumlah (1) + (2) = Rp. 17,205.00

    Bireuen, 27 April 2009Perencana

    CV. Ceudah Consultant

    M. Zanir, BEDirektur

  • HITUNGAN VOLUME BESIBerat Besi

    diameter kg/m' dia pj (m) hrg hrg/kg6 0.222 Besi Polos 12.00 9.5 29000 3437.6488 0.395 Besi Ulir 19.00 12 35000 1310.273

    10 0.62712 0.888 0.0014 1.20816 1.57819 2.226

    lebar tinggi panjang lariSloof (15/20) 0.15 0.20 37.80 berat/volume = 172.40 kg/m3

    Volume = 1.13 m3total berat = 195.50 kg

    Luas = 0.03 m2Beugel panjang per m3 = 33.33 m'

    Polos Besi diameter = 8.00 Jarak = 0.18Panjang beugel = 0.52 m'Jumlah = 210.00 Buah Berat = 43.47 kgTotal panjang = 110.04 m'

    TulanganPolos Besi diameter = 12.00

    Jumlah = 4.00 BuahPanjang = 151.20 m'

    Berat = 134.27 kg

    lebar tinggi panjang lariSloof (13/13) 0.13 0.13 9.81 berat/volume = 284.04 kg/m3

    Volume = 0.17 m3total berat = 47.09 kg

    Luas = 0.02 m2Beugel panjang per m3 = 59.17 m'

    Polos Besi diameter = 8.00 Jarak = 0.18Panjang beugel = 0.37 m'Jumlah = 54.50 Buah Berat = 7.97 kgTotal panjang = 20.17 m'

    TulanganPolos Besi diameter = 12.00

    Jumlah = 4.00 BuahPanjang = 39.24 m'

    Berat = 34.85 kg

    lebar tinggi panjang lari

    Kolom (13/13) 0.13 0.13 18.77 berat/volume = 291.19 kg/m3Volume = 0.32 m3

    total berat = 92.37 kgLuas = 0.02 m2

    Beugel panjang per m3 = 59.17 m'Polos Besi diameter = 8.00 Jarak = 0.18

    Panjang beugel = 0.42 m'Jumlah = 104.28 Buah Berat = 17.30 kgTotal panjang = 43.80 m'

    TulanganPolos besi diameter = 12.00

    Jumlah = 4.00 BuahPanjang = 75.08 m' Berat = 66.67 kg

  • lebar tinggi panjang lari

    Kolom (15/15) 0.15 0.15 11.73 berat/volume = 223.76 kg/m3Volume = 0.26 m3

    total berat = 59.06 kgLuas = 0.02 m2

    Beugel panjang per m3 = 44.44 m'Polos Besi diameter = 8.00 Jarak = 0.18

    Panjang beugel = 0.46 m'Jumlah = 66.17 Buah Berat = 12.02 kgTotal panjang = 30.44 m'

    TulanganPolos besi diameter = 12.00

    Jumlah = 4.00 BuahPanjang = 46.92 m' Berat = 41.66 kg

    lebar tinggi panjang lari

    Ring Balok (13/13) 0.13 0.13 53.61 berat/volume = 291.39 kg/m3Volume = 0.91 m3

    total berat = 264.00 kgLuas = 0.02 m2

    Beugel panjang per m3 = 59.17 m'Polos Besi diameter = 8.00 Jarak = 0.18

    Panjang beugel = 0.42 m'Jumlah = 298.83 Buah Berat = 49.58 kgTotal panjang = 125.51 m'

    besi diameter = 12.00Jumlah = 4.00 BuahPanjang = 214.44 m' Berat = 190.42 kg

    lebar tinggi panjang lari

    Balok Top Gevel 0.13 0.13 17.30 berat/volume = 291.81 kg/m3Volume = 0.29 m3

    total berat = 85.32 kgLuas = 0.02 m2

    Beugel panjang per m3 = 59.17 m'Polos Besi diameter = 8.00 Jarak = 0.18

    Panjang beugel = 0.42 m'Jumlah = 97.11 Buah Berat = 16.11 kgTotal panjang = 40.79 m'

    Polos besi diameter = 12.00Jumlah = 4.00 BuahPanjang = 69.20 m' Berat = 61.45 kg

  • HITUNGAN VOLUME BEKISTINGpanjang lebar tebal volume

    lebar tinggi panjang lari volumeSloof (15/20) cm 0.15 0.20 37.80 1.13 m3

    Luas papan = 15.12 m2

    Kayu klam 2.5/5 0.0013 m2 Jumlah = 8.32 bhPanjang = 41.58 m'Volume = 0.052 m2

    Total volume = 15.17 m2 luas/kubik = 13.38

    lebar tinggi panjang lari volumeSloof (13/13) cm 0.13 0.13 9.81 0.17 m3

    Luas papan = 2.55 m2

    Kayu klam 2.5/5 0.0013 m2 Jumlah = 1.53 bhPanjang = 7.65 m'Volume = 0.010 m2

    Total volume = 2.56 m2 luas/kubik = 15.44

    lebar tinggi panjang lari volumeKolom (15/15) cm 0.15 0.15 11.73 0.26 m3

    Luas papan = 7.04 m2

    Kayu klam 2.5/5 0.0013 m2 Jumlah = 0.12 bhPanjang = 0.60 m'Volume = 0.001 m2

    Total volume = 7.04 m2 luas/kubik = 26.67

    Kayu stut 5/7 = 0.0035 m2Panjang = 4.00 m'Jumlah = 8.00 bhVolume = 2.24 m2

  • lebar tinggi panjang lari volumeKolom (13/13) cm 0.13 0.13 18.77 0.32 m3

    Luas papan = 9.76 m2

    Kayu klam 2.5/5 0.0013 m2 Jumlah = 2.93 bhPanjang = 14.64 m'Volume = 0.018 m2

    Total volume = 9.78 m2 luas/kubik = 30.83

    Kayu stut 5/7 = 0.0035 m2Panjang = 4.00 m'Jumlah = 8.00 bhVolume = 2.24 m2

    lebar tinggi panjang lari volume0.13 0.13 53.61 0.91 m3

    Luas papan = 13.94 m2Balok Top Gevel(13/13) cm Kayu klam 2.5/5 0.0013 m2 Jumlah = 5.58 bh

    Panjang = 27.88 m'Volume = 0.035 m2

    Total volume = 13.97 m2 luas/kubik = 15.42

    lebar tinggi panjang lari volume0.13 0.13 17.30 0.29 m3

    Luas papan = 4.50 m2Balok Top Gevel(13/13) cm Kayu klam 2.5/5 0.0013 m2 Jumlah = 1.80 bh

    Panjang = 9.00 m'Volume = 0.011 m2

    Total volume = 4.51 m2 luas/kubik = 15.42

  • DAFTAR HARGA BAHAN & UPAH KERJAPekerjaan : RENCANA PEMBANGUNAN RUMAH INSTRUKTURLokasi : KABUPATEN BIREUEN

    NO. URAIAN @ Rp H. BAHAN SAT.

    HARGA BAHAN1 Batu bata @ Rp. 700.00 bh2 Batu kali @ Rp. 165,000.00 m33 Batu koral @ Rp. 120,000.00 m34 Kerikil cor @ Rp. 145,000.00 m35 Pasir cor @ Rp. 145,000.00 m36 Pasir pasang @ Rp. 145,000.00 m37 Pasir urug @ Rp. 85,000.00 m38 Tanah urug @ Rp. 75,000.00 m39 Semen PC( 40 kg ) @ Rp. 54,500.00 zak

    10 Tepung Keramik @ Rp. 7,500.00 kg11 Semen grouting @ Rp. 165,000.00 zak12 Keramik 20 X 20cm @ Rp. 5,500.00 bh13 Keramik 30 X 30cm @ Rp. 7,500.00 bh14 Besi beton polos 12 dan 8 @ Rp. 14,500.00 kg15 Besi beton polos 12 @ Rp. 14,500.00 kg16 Besi beton polos 8 @ Rp. 14,500.00 kg17 Kawat beton @ Rp. 16,500.00 kg18 Paku kayu @ Rp. 14,500.00 kg19 Paku seng @ Rp. 850.00 bh20 Sekrup @ Rp. 950.00 bh21 Paku Zincalum @ Rp. 1,000.00 bh22 Besi plat 1,20 mm 8"X4" @ Rp. 12,400.00 kg23 Besi hollow @ Rp. 3,700.00 btg24 Kayu setara klas II @ Rp. 3,750,000.00 m325 Kayu Setara klas III @ Rp. 2,800,000.00 m326 Papan setara klas II @ Rp. 3,450,000.00 m327 Kayu bekisting @ Rp. 1,800,000.00 m328 Papan bekisting @ Rp. 1,800,000.00 m329 Kayu rangka dinding,plafond/setara kelas II @ Rp. 3,450,000.00 m330 Kayu rangka bowplank @ Rp. 1,500,000.00 m331 Papan rangka bowplank @ Rp. 1,800,000.00 m332 Triplek 4 mm @ Rp. 65,000.00 lbr33 Triplek 9 mm @ Rp. 95,000.00 lbr34 Dolken Kayu 8 - 10/4 m @ Rp. 17,500.00 btg35 List profil kayu 5x5cm @ Rp. 6,000.00 m136 Roster 20 x 30 cm @ Rp. 5,000.00 bh37 Lem kayu @ Rp. 13,500.00 kg38 Kaca 5 mm @ Rp. 85,000.00 m239 Cat tembok @ Rp. 29,500.00 kg

  • NO. URAIAN @ Rp H. BAHAN SAT.

    HARGA BAHAN40 Cat Dasar Tembok/Wall Siller @ Rp. 18,500.00 kg41 Cat kayu @ Rp. 34,500.00 kg42 Cat besi @ Rp. 34,500.00 kg43 Plamur tembok @ Rp. 19,500.00 kg44 Plamur kayu/cat dasar @ Rp. 15,500.00 kg45 Cat meni @ Rp. 24,500.00 kg46 Amplas @ Rp. 3,500.00 lbr47 Minyak cat @ Rp. 12,500.00 ltr48 Minyak bekisting @ Rp. 9,500.00 ltr49 Kuas 2'' @ Rp. 6,500.00 bh50 Steger @ Rp. 25,000.00 set51 Bj. R.C 74.34,34.0.75 @ Rp. 24,500.00 m152 Atap zincalum t= 0.30 mm @ Rp. 85,000.00 m253 Nok atap zincalum t = 0.30mm @ Rp. 25,500.00 m154 Flashing fc.Az.55 w / 4-45 t = 0.30mm @ Rp. 26,500.00 m155 Gording 'Bj.Fs.Zc.50 / 4-4, @ Rp. 19,500.00 m156 Kosen+ pintu PVC @ Rp. 500,000.00 bh57 Engsel 4" @ Rp. 11,500.00 bh58 Engsel 3" @ Rp. 9,500.00 bh59 Kunci tanam 2 slaag setara ex. Yale @ Rp. 115,000.00 bh60 Kunci/ pacok jendela @ Rp. 19,500.00 bh61 Hak angin @ Rp. 12,000.00 bh62 Tarikan jendela @ Rp. 12,000.00 bh63 Kloset jongkok @ Rp. 185,000.00 bh64 Floor drain @ Rp. 17,500.00 bh65 Kran air @ Rp. 26,000.00 bh66 Seal Teap @ Rp. 4,500.00 bh67 Pipa AW 4"- 6m @ Rp. 11,000.00 m'68 Pipa D 4"- 6m @ Rp. 11,000.00 m'69 Saklar tunggal setara broco + Instalansi @ Rp. 23,800.00 bh70 Saklar ganda setara broco + Instalansi @ Rp. 29,800.00 bh71 Titik Lampu + Instalansi @ Rp. 75,000.00 bh72 Stop kontak setara broco + Instalansi @ Rp. 35,000.00 bh73 Box sekring + Instalansi @ Rp. 165,000.00 bh

  • NO. URAIAN @ Rp UPAH KERJA

    UPAH KERJA

    1 Kepala tk. Batu @ Rp. 67,500.00 2 Tk. Batu @ Rp. 60,000.00 3 Pekerja batu @ Rp. 43,000.00

    1 Kepala tk. Besi @ Rp. 67,500.00 2 Tk. Besi @ Rp. 60,000.00 3 Pekerja besi @ Rp. 43,000.00

    1 Kepala tk. kayu @ Rp. 67,500.00 2 Tk. kayu @ Rp. 60,000.00 3 Pekerja kayu @ Rp. 43,000.00

    1 Kepala tk. Cat @ Rp. 67,500.00 2 Tk. Cat @ Rp. 60,000.00 3 Pekerja cat @ Rp. 43,000.00

    1 Pekerja @ Rp. 43,000.00 2 Mandor @ Rp. 48,000.00

    1 Tukang ukur @ Rp. 67,500.00 2 Tukang gali @ Rp. 67,500.00

    30-Dec-99

    - -

    - -

  • HARGA UPAH KERJA DAN BAHAN

    A. UPAH KERJA Hal 1

    NO JENIS PERSONIL HARGA (Rp) SATUAN KETERANGAN1 2 3 4 5

    1 Kepala Tukang 85,000.00 Hari2 Mandor 60,000.00 Hari3 Pekerja 55,000.00 Hari4 Tukang 75,000.00 Hari

    B. HARGA BAHAN

    NO JENIS MATERIAL/BAHAN HARGA (Rp) SATUAN KETERANGAN1 2 3 4 5

    1 Asbes 1 x 1 M 7,500.00 Lbr2 Tanah Timbun 75,000.00 3 Keramik 40 x 40 Cm 7,500.00 Bh4 Keramik 20 x 25 Cm 5,500.00 Bh5 Keramik Nosing (Bon-Bon) 25,000.00 6 Profil Plafond 6,500.00 7 Batu Bata 700.00 Bh8 Balok Kayu Merante/Sejenis 3,650,000.00 9 Balok Kayu Damar Laut/Sejenis 4,500,000.00 10 Balok Kayu Merbo/Bahan Kosen 3,800,000.00 11 Besi Beton 15,500.00 Kg12 Kawat Beton 16,500.00 Kg13 Kayu Stut 2,000,000.00 M314 Kayu Bekisting 2,700,000.00 15 Kertas Pasir 3,500.00 Lbr16 Kerikil Bersih 145,000.00 17 Kunci Union 2 Slaag 95,000.00 Bh18 Cat Dasar 19,500.00 Kg19 Cat Kilat 35,000.00 Kg20 Cat Menie 26,500.00 Kg21 Cat Polymix 24,500.00 Kg22 Dempul 23,000.00 Kg23 Tinner 23,500.00 Ltr24 Engsel "ARCH" 4 inc 18,500.00 Bh25 Engsel "ARCH" 3 inc 15,500.00 Bh26 Hak Angin 14,500.00 Bh27 Pacok Jendela 11,500.00 Bh28 Paku Kayu 2 inc - 5 icn 18,500.00 Kg29 Paku Seng 950.00 Bh30 PapanLisplank Kayu Merbo 3,850,000.00 31 Pasir Beton 145,000.00 32 Pasir Urug 85,000.00 33 Triplek 4 mm 85,000.00 Lbr34 Rabung Seng 28,500.00 Lbr35 Semen PC (Isi 40 Kg) 54,500.00 Zak36 Semen Putih 165,000.00 Zak37 Seng BJLS 0,20 x 8 " 89,500.00 Lbr38 Grendel Jendela 11,500.00 Bh39 Batu Kali 165,000.00 40 Batu Krawang 112,000.00

    M3

    M1M1

    M3M3M3

    M3

    M3

    M3M3M3

    M3M2

  • Hal 2

    1 2 3 4 5

    41 Kloset Jongkok 175,000.00 Bh42 Kran Air 45,000.00 Bh43 Kaca Bening 3 mm 85,000.00 44 Floor Drain 28,000.00 Bh45 Lampu TL 20 Watt 43,000.00 Bh46 Lampu Pijar 40 Watt 21,000.00 Bh47 Saklar Triple 25,000.00 Bh48 Saklar Ganda 21,000.00 Bh49 Saklar Tunggal 15,000.00 Bh50 Stop Kontak 15,000.00 Bh51 Box Zekering 165,000.00 Bh52 Pipa Sparing 16,000.00 Btg

    Bireuen, 23 April 2009

    Konsultan Perencana :CV. CEUDAH CONSULTANT

    Direktur

    M2

    ( M. Zanir, BE )

  • 1 Abu batu M3 65,000.00 2 Alat - alat bantu Unit ###3 Aspal Bitument Kg 3,750.00 4 Asbes Eternit 1 x 1 M2 11,000.00 5 Atap asbes gelombang 8 kaki Lebar 26,000.00 6 Aluminium M2 7,700.00 7 Bak cuci piring dari logam Set ###8 Bak cuci tangan wastafel Unit ###9 Bak mandi porselin battub Set ###

    10 Balok kayu merante/sejenis M3 ###11 Balok kayu damar laut/sejenis M3 ###12 Balok kayu merbo/bahan kosen M3 ###13 Bambu Batang 16,800.00 14 Batako (0,2 x 0,3) m Buah 5,040.00 15 Batu bata Buah 445.00 16 Batu gunung M3 ###17 Batu Kali M3 ###18 Besi baut kuda - kuda Buah 3,600.00 19 Besi beton Kg 6,600.00 20 Besi profil Kg 7,200.00 21 Besi GIP 2 In Batang ###22 BRC, 5 - 7 cm 0,8 mm M2 ###23 Baja konstruksi/profil Kg 7,200.00 24 Buis beton Dia, 15 cm Buah 44,700.00 25 Buis beton Dia, 30 cm Buah 66,000.00 26 Buis beton Dia, 0,20 m M' 48,000.00 27 Buis beton Dia 0,40 m M' 61,000.00 28 Buis beton Dia 0,50 m M' 73,000.00 29 Buis beton Dia 0,60 m M' 90,000.00 30 Buis beton Dia 0,80 m M' ###

    Bumbungan Genteng Warna Buah 6,500.00 Bumbungan Seng BJLS 0,30 Lbr 12,500.00

    31 Buis beton Dia 1,00 m M' ###32 Buis beton bertulang 0,80 m M' ###33 Buis beton bertulang 1,00 m M' ###34 Beton tiang pagar antik L = 70 cm Buah 70,000.00 35 Bubuk / tepung batu kapur Kg 750.00 36 Cat dasar Kg 12,300.00 37 Cat kilat Kg 32,500.00 38 Cat menie Kg 14,000.00 39 Cat polymix Kg 15,250.00 40 Cat ICI super clos Kg 51,000.00 41 Cat tembok ICI (Whiter hield) Kg 64,500.00 42 Dempul ICI Kg 33,500.00 43 Daikin (Karpus 361) 30 x 60 cm t= 12 Lebar 40,500.00 44 Daikin sealing (karpus 361) 30 x 60 cm Lebar 30,600.00 45 Daikin rib (karpus 361) 30 x 60 cm t = 1 Lebar 40,500.00 46 Engsel "ARCH" 4 inc Buah 12,200.00 47 Engsel "ARCH" 3 inc Buah 10,100.00 48 Elbow PVC 0,4 inc Buah 6,000.00 49 Elbow PVC 0,3 inc Buah 5,000.00 50 Elbow PVC 0,5 inc Buah 3,000.00 51 Elbow PVC 3/4 inc Buah 2,000.00 52 Elbow PVC 1/2 inc Buah 1,900.00 53 Elbow galvanis 0,4 inc Buah 60,000.00 54 Elbow galvanis 0,3 inc Buah 34,000.00 55 Elbow galvanis 0,5 inc Buah 7,000.00 56 Elbow galvanis 1 inc Buah 4,000.00 57 Elbow galvanis 3/4 inc Buah 4,000.00 58 Elbow galvanis 1/2 inc Buah 2,000.00

  • 59 Filter Kg 23,000.00 60 Floor drain Sun - Ei Buah 18,000.00 61 Triplek formika 4 mm Lembar 70,000.00 62 Gantungan handuk Sun - Ei Singgle Buah ###63 Gantungan handuk Sun - Ei Dable Buah ###64 Gemuk / Grease Kg 10,500.00 65 Genteng concret warna Buah 4,200.00 66 Grendel jendela Buah 4,000.00 67 Gipsu Australia ( 1,2 x 2,4) m t = 9 mm Lembar 42,000.00 68 Gipsu Australia ( 1,2 x 2,4) m t = 6 mm Lembar 40,000.00 69 Genteng ekatana berpasir Keping 55,000.00 70 Genteng super steel (0,4 x 1,2 )m Keping 40,000.00 71 Genteng keramik kia premium Keping 15,700.00 72 Genteng keramik kia standar Keping 13,100.00 73 Genteng keramik kia natural Keping 9,700.00 74 Genteng keramik kia khusus Keping 13,000.00 75 Genteng keramik kia exlusive Keping 15,000.00 76 Glas blok ( 15 x 15 cm ) Buah 15,000.00 77 Hak angin Buah 3,000.00 78 Inter blok warna Buah 1,800.00 79 Marmer Lampung 40 x 60 x 1,8 cm M2 ###80 Marmer Lampung 40 x 50 x 1,8 cm M2 ###81 Marmer Lampung 40 x 40 x 1,8 cm M2 ###82 Marmer Lampung 30 x 60 x 1,8 cm M2 ###83 Marmer Lampung 30 x 50 x 1,8 cm M2 ###84 Marmer Lampung 30 x 40 x 1,8 cm M2 ###85 Marmer Lampung 30 x 30 x 1,8 cm M2 ###86 Marmer Lampung 20 x 40 x 1,8 cm M2 92,000.00 87 Marmer Lampung 20 x 30 x 1,8 cm M2 81,000.00 88 Marmer Lampung 20 x 20 x 1,8 cm M2 79,000.00 89 Marmer Lampung 15 x 30 x 1,8 cm M2 75,000.00 90 Marmer Lampung 10 x 30 x 1,8 cm M2 72,000.00 91 Marmer Lampung 5 x 15 x 0,7 cm M2 52,500.00 92 Marmer Lampung 10 x 20 x 0,7 cm M2 49,000.00 93 Marmer Lampung 10 x 30 x 0,7 cm M2 41,000.00 94 Marmer Lampung 15 x 30 x 0,7 cm M2 70,000.00 95 Marmer Lampung 20 x 30 x 0,7 cm M2 81,000.00

    Minyak Cat Ltr 12,600.00 96 Jendela nako 5 mm ( 8 sisir ) Set 60,000.00 97 Kaca bening 5 mm M2 45,000.00 98 Kaca bening 3 mm M2 35,000.00 99 Kaca cermin wastafel Buah ###

    100 Kaca reyben 3 mm M2 45,000.00 101 Kaca reyben 4 mm M2 55,000.00 102 Kawar ayam 3 mm Kg 12,500.00 103 Kawart beton Kg 10,000.00 104 Kawat bronjong 0,4 mm M2 8,500.00 105 Kawat harmonika M2 14,000.00 106 kawat nyamuk logam M2 10,100.00 107 Kawat nyamuk plastik M2 8,200.00 108 Kayu bakar M3 75,000.00 109 Kayu bakau 10 cm Batang 16,000.00 110 kayu stut M3 ###111 Kayu bekisting M3 ###112 kayu merbo M3 ###

    kayu merante M3 ###113 Kayu untuk perancah M3 ###114 Keramik roman M2 3,600.36 115 Kertas pasir Lembar 1,700.00 116 Kerikil M3 ###117 Kloset duduk "KIA" Buah ###118 Kloset Jongkok "KIA" Buah 98,000.00 119 kloset jongkok "Trassol" Buah 40,000.00 120 Kran merk "Sun - Ei "biasa Buah 79,100.00 121 Kunci Lesa tipe 2328 Buah ###122 kunci lips Buah 73,500.00 123 Kunci veron asli Buah ###124 Kunci union 2 slag Buah 77,350.00

  • 125 Karpet 4 mm L 2 m Merk Nobel Buah ###126 Kanstin beton L = 50 cm M' 10,150.00 127 Lem aibon Buah 17,000.00 128 Lempengan rumput M2 11,500.00 129 Lat asbes Batang 2,200.00 130 Minyak pelumas Liter 17,500.00 131 Minyak solar Liter 700.00 132 minyak premium Liter 1,450.00 133 Minyak aspal Liter 2,350.00 134 Minyak tanah Liter 650.00 135 Minyak rem Liter 11,500.00 136 mozaik M2 46,150.00 137 Pecahan genteng Kg 92,300.00 138 Pupuk kandang M3 ###139 Paku jembatan Kg 35,500.00 140 Paku asbes Kg 25,000.00 141 Paku Kayu 2 inc - 5 icn Kg 13,500.00 142 Paku seng Kg 15,000.00 143 Paku sekrup Kg 15,000.00

    Paku Sumbat Buah 75.00 144 Paku beton Kotak 12,000.00 145 Papan lisplank kayu semantok M2 ###146 Pasir beton M3 73,000.00 147 Pasir Urug M3 50,000.00 148 Pipa besi 0,2 inc Batang ###149 Pipa besi 3/4 icn Batang 56,700.00 150 Pipa besi 1/2 icn Batang 34,500.00 151 Pipa "GIP" 0,1 inc Batang 77,000.00 152 Pipa "GIP" 0,2 inc Batang ###153 Pipa "GIP" 0,3 inc Batang ###154 Pipa "GIP" 0,4 inc Batang ###155 Pipa "PVC" 0,2 inc (Super Insar) Batang 73,600.00 156 Pipa "PVC" 0,3 inc (Super Insar) Batang ###157 Pipa "PVC" 3/4 inc (Super Insar) Batang 29,700.00 158 Pipa "PVC" 1/2 inc (Super Insar) Batang 23,000.00 159 Pipa "PVC" 4 inc (Super Insar) Batang ###160 Pipa "PVC" 6 inc (Super Insar) Batang ###161 Pipa "PVC" 8 inc (Super Insar) Batang ###162 Plin Ubin warna Lembar 1,800.00 163 Plywood 12 mm Lembar ###164 Triplek Plywood 4 mm Lembar 45,100.00 165 Plywood 6 mm Lembar 60,900.00 166 Plywood 9 mm Lembar ###167 Polyplex 4 mm Lembar 66,000.00 168 Rabung asbes Lembar 9,100.00 169 Rabung seng Lembar 10,000.00 170 Rabung genteng merk KIA (NOK S2) war M' 19,000.00 171 Rabung genteng merk KIA (NOK S2) warn M' 16,000.00 172 Rabung genteng merk KIA (NOK S2) war M' 16,000.00 173 Rabung genteng merk KIA (NOK S2) warn M' 19,600.00 174 Rabung genteng merk KIA (NOK S2) warn M' 25,000.00 175 Rabung genteng merk EKAPANA GERARD M' 24,000.00 176 Rabung genteng merk super steel M' 31,000.00 177 Rangka aluminium T Batang 37,000.00 178 Residu Kg 2,000.00 179 Semen PC (Isi 40 Kg) Zak 27,500.00 180 Semen putih Zak 52,000.00 181 Seng BJLS 0,20 x 8 " Lembar 32,900.00 182 Seng BJLS 0,30 x 8" Lembar 37,000.00 183 Seng BJLS 0,35 x 8" Lembar 49,000.00 184 Sub base klas B - 59,500.00 185 Soket PVC 0,4 inc Buah 7,000.00 186 Soket PVC 0,3 inc Buah 6,500.00 187 Soket PVC 1,5 inc Buah 4,500.00 188 Soket PVC 1 inc Buah 3,000.00 189 Soket PVC 3/4 inc Buah 2,000.00 190 Soket PVC 1/2 inc Buah 1,500.00 191 Soket GIP 0,4 inc Buah 37,000.00

  • 192 Soket GIP 0,3 inc Buah 23,000.00 193 Soket GIP 1,5 inc Buah 9,500.00 194 Soket GIP 1 inc Buah 7,500.00 195 Soket GIP 3/4 inc Buah 6,500.00 196 Soket GIP 1/2 inc Buah 5,000.00 197 Tanah ladang M3 40,500.00 198 Tanah humus M3 40,500.00 199 Tanah Timbun M3 30,000.00 200 Tegel abu-abu 30 x 30 cm Buah 2,500.00 201 Tegel traso 30 x 30 cm Buah 3,950.00 202 Tegel wafel 20 x 20 cm Buah 2,500.00 203 Tegel warna 30 x 30 cm Buah 2,500.00 204 Tempat memasak aspal Buah ###205 Tempat sabun merk KIA Buah 29,400.00 206 Tempat sabun merk Sun - Ei Buah 67,200.00 207 Tempat sikat gigi Sun - Ei Buah 27,300.00 208 Tear Kg 1,950.00 209 Tinner Liter 12,600.00 210 Urinoir Buah ###211 Vernis Liter 18,000.00 212 Pintu air rangka besi dengan daun pintu papan merbo- Lebar 1,50 m tinggi 6,00 m Unit ###- Lebar 1,00 m tinggi 6,00 m Unit ###- Lebar 1,00 m tinggi 5,00 m Unit ###- Lebar 1,00 m tinggi 4,00 m Unit ###- Lebar 1,00 m tinggi 3,00 m Unit ###

    REKAB RABRABANALISAAnalisa SNIHitungan BesiBekistingDAFTAR BAHANH.bahan