rab sekolah

61
ANALISA BIAYA KONSTRUKSI Analisa Pekerjaan Pendahuluan Pagar Seng Gelombang tinggi 2m bahan 0.05 m3 kayu kelas 4 5,445,000.00 0.05 sak Semen PC 69,300.00 1.2 lbr Seng Gelombang 39,600.00 0.01 m3 Pasir Beton 118,800.00 0.01 m3 Split 283,140.00 0.05 m3 kayu kelas 4 5,445,000.00 0.06 kg paku 5-10 21,235.50 Tenaga 0.2 Oh Tukang Kayu 123,750.00 0.1 Oh Kenek 79,200.00 Total 1 M Pengukuran dan Pemasangan Blowplank Bahan 0.022 M3 Kayu Kelas IV 5,445,000.00 0.02 kg Paku 2"-5" 21,235.50 Tenaga 0.1 Oh Tukang Kayu 123,750.00 0.1 Oh Kenek 79,200.00 Total Analisa Biaya Konstruksi Pekerjaan tanah Pembersihan Lokasi Proyek Tenaga 0.1 Oh Pekerja 64,350.00 Pembersihan Puing- Puing Tenaga 0.2 Oh Pekerja 64,350.00 1 M2 Pekerjaan Striping 10 cm Tenaga 0.05 Oh Kenek 79200 0.02 Oh tukang 123750 Total 1 M3 Galian tanah biasa sedalam 1 meter Tenaga 0.4 Oh Pekerja 64,350.00 0.04 Oh Tukang 123,750.00 Jumlah 1 M3 Urugan kembali Tenaga 0.192 Oh Pekerja 64,350.00 0.0192 Oh Tukang 123,750.00 Jumlah 1 M3 Pemadatan Tanah Tenaga 0.5 Oh Pekerja 64,350.00 0.05 Oh Tukang 123,750.00 Jumlah 1 M3 Urugan Pasir Bahan 1.2 M3 Pasir Urug 99,000.00 Jumlah (1) Tenaga 0.3 Oh Pekerja 64,350.00 0.01 Oh Mandor 122,839.20 Jumlah (2) Total (1+2) 1 M3 Pas. Batu Kosong Bahan 1.2 M3 Batu Belah 232,065.90

Upload: hilda-masito-tanjung

Post on 10-Apr-2016

223 views

Category:

Documents


25 download

DESCRIPTION

rab

TRANSCRIPT

Page 1: RAB Sekolah

ANALISA BIAYA KONSTRUKSI Analisa Pekerjaan Pendahuluan

Pagar Seng Gelombang tinggi 2mbahan

0.05 m3 kayu kelas 4 5,445,000.000.05 sak Semen PC 69,300.00

1.2 lbr Seng Gelombang 39,600.000.01 m3 Pasir Beton 118,800.000.01 m3 Split 283,140.000.05 m3 kayu kelas 4 5,445,000.000.06 kg paku 5-10 21,235.50

Tenaga0.2 Oh Tukang Kayu 123,750.000.1 Oh Kenek 79,200.00

Total1 M Pengukuran dan Pemasangan BlowplankBahan

0.022 M3 Kayu Kelas IV 5,445,000.000.02 kg Paku 2"-5" 21,235.50

Tenaga0.1 Oh Tukang Kayu 123,750.000.1 Oh Kenek 79,200.00

TotalAnalisa Biaya Konstruksi Pekerjaan tanah

Pembersihan Lokasi ProyekTenaga

0.1 Oh Pekerja 64,350.00Pembersihan Puing- PuingTenaga

0.2 Oh Pekerja 64,350.00

1 M2 Pekerjaan Striping 10 cmTenaga

0.05 Oh Kenek 792000.02 Oh tukang 123750

Total1 M3 Galian tanah biasa sedalam 1 meterTenaga

0.4 Oh Pekerja 64,350.000.04 Oh Tukang 123,750.00

Jumlah1 M3 Urugan kembaliTenaga

0.192 Oh Pekerja 64,350.000.0192 Oh Tukang 123,750.00

Jumlah1 M3 Pemadatan TanahTenaga

0.5 Oh Pekerja 64,350.000.05 Oh Tukang 123,750.00

Jumlah1 M3 Urugan Pasir Bahan

1.2 M3 Pasir Urug 99,000.00Jumlah (1)

Tenaga0.3 Oh Pekerja 64,350.00

0.01 Oh Mandor 122,839.20Jumlah (2)Total (1+2)

1 M3 Pas. Batu KosongBahan

1.2 M3 Batu Belah 232,065.90

Page 2: RAB Sekolah

0.3 M3 Pasir Urug 99,000.00Tenaga

0.78 Oh Pekerja 64,350.000.39 Oh Tukang Batu 123,750.00

Total

1 M3 Urugan Tanah timbun PilihanBahan

1.2 M3 Tanah Pilihan 141,570.00Jumlah (1)

Tenaga0.3 Oh Buruh 64,350.00

0.02 Oh Mandor 122,839.20Jumlah (2)Total

1 M3 Pondasi Batu kaliBahan

1.1 M3 Batu Kali Bulat 382,239.00

4.04 Zak Semen PC 69,300.000.49 M3 Pasir Pasang 113,850.00

Jumlah (1)Tenaga

1.5 Oh Pembantu tukang 79,200.000.6 Oh Tukang Batu 123,750.00

Jumlah (2)Total (1+2)

Analisa biaya konstruksi Pekerjaan Beton1 M3 Membuat beton tumbuk 1 Pc : 3 Ps: 5 KrBahan

218 kg Semen Portland 1,386.000.52 M3 Pasir Beton 118,800.000.87 M3 Batu Kerikil 283,140.00

Jumlah (1)

Tenaga1.65 Oh Pembantu Tukang 79,200.000.25 Oh Tukang Batu 123,750.00

0.025 Oh Kepala tukang 148,500.000.08 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M3 Membuat Beton Tumbuk 1 Pc : 2 Ps : 3 KrBahan

232 kg Semen Portland 1,386.000.52 M3 Pasir Beton 118,800.000.78 M3 Batu Kerikil 283,140.00

Jumlah (1)Tenaga

1.65 Oh Pembantu Tukang 79,200.000.25 Oh Tukang Batu 123,750.00

0.025 Oh Kepala tukang 148,500.000.08 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M3 Membuat Beton Bertulang 1 Pc : 2 Ps: 3 KrBahan

336 kg Semen Portland 1,386.000.54 M3 Pasir Beton 118,800.000.81 M3 Batu Kerikil 283,140.00

Jumlah (1)Tenaga

2 Oh Pembantu Tukang 79,200.00

Page 3: RAB Sekolah

0.35 Oh Tukang Batu 123,750.000.035 Oh Kepala tukang 148,500.00

1 Oh Mandor 122,839.20Jumlah (2)Total (1+2)

1 M2 Pemasangan Bekisting untuk pondasiBahan

2.2 m2 Kayu Kls IV Dia. 4-6"/3 38,332.800.3 kg paku biasa 2"-5" 21,235.500.1 ltr Minyak Bekisting 20,601.70

Jumlah (1)Tenaga

0.3 Oh Pembantu Tukang 79,200.000.26 Oh Tukang kayu 129,100.00

0.026 Oh Kepala tukang 148,500.000.005 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M3 Pemasangan Bekisting untuk sloofBahan

0.04 m3 Kayu Sembarang 5,445,000.000.3 kg paku biasa 2"-5" 21,235.500.1 ltr Minyak Bekisting 20,601.70

Jumlah (1)Tenaga

0.3 Oh Pembantu Tukang 79,200.000.26 Oh Tukang kayu 129,100.00

0.026 Oh Kepala tukang 148,500.000.005 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M2 Pemasangan Bekisting untuk kolomBahan

2.2 m2 Kayu Kls IV Dia. 4-6"/3 38,332.800.4 kg paku biasa 2"-5" 21,235.500.2 ltr Minyak Bekisting 20,601.70

0.015 M3 Balok Kayu Kuat Kls IV 5,445,000.00Jumlah (1)

Tenaga0.3 Oh Pembantu Tukang 79,200.00

0.33 Oh Tukang kayu 123,750.000.033 Oh Kepala tukang 148,500.000.005 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M2 Pemasangan Bekisting untuk balokBahan

0.04 m3 kayu terentang 5,445,000.000.4 kg paku biasa 2"-5" 21,235.500.2 ltr Minyak Bekisting 20,601.70

0.015 M3 Balok Kayu Kuat Kls IV 5,445,000.00Jumlah (1)

Tenaga0.32 Oh Pembantu Tukang 79,200.000.33 Oh Tukang kayu 123,750.00

0.033 Oh Kepala tukang 148,500.000.006 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

Analisa Biaya Konstruksi Pekerjaan Dinding1 M2 Pasang Bata merah tebal 1 bata, 1 Pc : 1 PsBahan

140 bh Bata Merah 707.85

Page 4: RAB Sekolah

64.03 kg Semen Portland 1,386.000.06 M3 Pasir 118,800.00

Jumlah (1)Tenaga

0.65 Oh Pembantu Tukang 79,200.000.2 Oh Tukang Batu 123,750.00

0.02 Oh Kepala tukang 148,500.000.03 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M2 Pasang Bata merah tebal 1 bata, 1 Pc : 2 PsBahan

140 bh Bata Merah 707.8543.5 kg Semen Portland 1,386.000.08 M3 Pasir 118,800.00

Jumlah (1)Tenaga

0.65 Oh Pembantu Tukang 79,200.000.2 Oh Tukang Batu 123,750.00

0.02 Oh Kepala tukang 148,500.000.03 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M2 Pasang Bata merah tebal 1 bata, 1 Pc : 3 PsBahan

140 bh Bata Merah 707.8532.95 kg Semen Portland 1,386.000.091 M3 Pasir 118,800.00

Jumlah (1)Tenaga

0.65 Oh Pembantu Tukang 79,200.000.2 Oh Tukang Batu 123,750.00

0.02 Oh Kepala tukang 148,500.000.03 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M2 Pasang Bata merah tebal 1 bata, 1 Pc : 4 PsBahan

140 bh Bata Merah 707.8526.55 kg Semen Portland 1,386.000.093 M3 Pasir 118,800.00

Jumlah (1)Tenaga

0.65 Oh Pembantu Tukang 79,200.000.2 Oh Tukang Batu 123,750.00

0.02 Oh Kepala tukang 148,500.000.03 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M2 Pasang Bata merah tebal 1/2 bata, 1 Pc : 1 PsBahan

70 bh Bata Merah 707.8527.8 kg Semen Portland 1,386.00

0.028 M3 Pasir 118,800.00Jumlah (1)

Tenaga0.32 Oh Pembantu Tukang 79,200.00

0.1 Oh Tukang Batu 123,750.000.01 Oh Kepala tukang 148,500.00

0.015 Oh Mandor 122,839.20Jumlah (2)Total (1+2)

1 M2 Pasang Bata merah tebal 1/2 bata, 1 Pc : 2 Ps

Page 5: RAB Sekolah

Bahan70 bh Bata Merah 707.85

18.95 kg Semen Portland 1,386.000.038 M3 Pasir 118,800.00

Jumlah (1)

Tenaga0.32 Oh Pembantu Tukang 79,200.00

0.1 Oh Tukang Batu 123,750.000.01 Oh Kepala tukang 148,500.00

0.015 Oh Mandor 122,839.20Jumlah (2)Total (1+2)

1 M2 Pasang Bata merah tebal 1/2 bata, 1 Pc : 3 PsBahan

70 bh Bata Merah 707.8514.37 kg Semen Portland 1,386.00

0.04 M3 Pasir 118,800.00Jumlah (1)

Tenaga0.32 Oh Pembantu Tukang 79,200.00

0.1 Oh Tukang Batu 123,750.000.01 Oh Kepala tukang 148,500.00

0.015 Oh Mandor 122,839.20Jumlah (2)Total (1+2)

1 M2 Pasang Bata merah tebal 1/2 bata, 1 Pc : 4 PsBahan

70 bh Bata Merah 707.8511.5 kg Semen Portland 1,386.00

0.043 M3 Pasir 118,800.00Jumlah (1)

Tenaga0.32 Oh Pembantu Tukang 79,200.00

0.1 Oh Tukang Batu 123,750.000.01 Oh Kepala tukang 148,500.00

0.015 Oh Mandor 122,839.20Jumlah (2)Total (1+2)

Analisa Biaya Konstruksi Pekerjaan Plesteran1 M2 Plesteran 1pc : 1 Ps, Tebal 15 mmBahan

12.92 kg Semen Portland 1,386.000.013 M3 Pasir 118,800.00

Jumlah (1)Tenaga

0.2 Oh Pembantu Tukang 79,200.000.15 Oh Tukang Batu 123,750.00

0.015 Oh Kepala tukang 148,500.000.01 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M2 Plesteran 1pc : 2 Ps, Tebal 15 mmBahan

8.52 kg Semen Portland 1,386.000.017 M3 Pasir 118,800.00

Jumlah (1)Tenaga

0.2 Oh Pembantu Tukang 79,200.000.15 Oh Tukang Batu 123,750.00

0.015 Oh Kepala tukang 148,500.000.01 Oh Mandor 122,839.20

Jumlah (2)

Page 6: RAB Sekolah

Total (1+2)

1 M2 Plesteran 1pc : 3 Ps, Tebal 15 mmBahan

6.48 kg Semen Portland 1,386.000.019 M3 Pasir 118,800.00

Jumlah (1)Tenaga

0.2 Oh Pembantu Tukang 79,200.000.15 Oh Tukang Batu 123,750.00

0.015 Oh Kepala tukang 148,500.000.01 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M2 Plesteran 1pc : 4 Ps, Tebal 15 mmBahan

5.2 kg Semen Portland 1,386.000.02 M3 Pasir 118,800.00

Jumlah (1)Tenaga

0.2 Oh Pembantu Tukang 79,200.000.15 Oh Tukang Batu 123,750.00

0.015 Oh Kepala tukang 148,500.000.01 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M2 Plesteran 1pc : 2 Ps, Tebal 20 mmBahan

14.28 kg Semen Portland 1,386.000.023 M3 Pasir 118,800.00

Jumlah (1)Tenaga

0.25 Oh Pembantu Tukang 79,200.000.2 Oh Tukang Batu 123,750.00

0.02 Oh Kepala tukang 148,500.000.0125 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M2 Plesteran 1pc : 3 Ps, Tebal 20 mmBahan

10.8 kg Semen Portland 1,386.000.026 M3 Pasir 118,800.00

Jumlah (1)Tenaga

0.25 Oh Pembantu Tukang 79,200.000.2 Oh Tukang Batu 123,750.00

0.02 Oh Kepala tukang 148,500.000.0125 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M2 Plesteran 1pc : 4 Ps, Tebal 20 mmBahan

8.68 kg Semen Portland 1,386.000.028 M3 Pasir 118,800.00

Jumlah (1)Tenaga

0.25 Oh Pembantu Tukang 79,200.000.2 Oh Tukang Batu 123,750.00

0.02 Oh Kepala tukang 148,500.000.0125 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M2 Plesteran beton 1pc : 2 Ps, Tebal 15 mm

Page 7: RAB Sekolah

Bahan9.3 kg Semen Portland 1,386.00

0.018 M3 Pasir 118,800.00Jumlah (1)

Tenaga0.26 Oh Pembantu Tukang 79,200.00

0.2 Oh Tukang Batu 123,750.000.02 Oh Kepala tukang 148,500.00

0.013 Oh Mandor 122,839.20Jumlah (2)Total (1+2)

1 M2 Plesteran beton 1pc : 3 Ps, Tebal 15 mmBahan

7.07 kg Semen Portland 1,386.000.05 M3 Pasir Pasang 118,800.00

Jumlah (1)Tenaga

0.26 Oh Pembantu Tukang 79,200.000.2 Oh Tukang Batu 123,750.00

0.02 Oh Kepala tukang 148,500.000.013 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

Analisa Biaya Konstruksi pekerjaan kayu1 M2 pasang lisplank ukuran (3 x 20 cm), kayu kuat kelasII Dia. 4-6"/3Bahan

2.2 M2 Kayu Kuat Kls II, papan 113,691.600.05 kg Paku biasa 2"-5" 21,235.50

Jumlah (1)Tenaga

0.1 Oh Pembantu Tukang 79,200.000.2 Oh Tukang Kayu 123,750.00

0.025 Oh Kepala tukang 148,500.000.005 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M3 Pemasangan Kusen dan daun pintuBahan

1.2 M3 Kayu Kelas II 9,260,442.18Tenaga

6 Oh Kenek 79,200.0015 Oh Tukang Kayu 123,750.00

Total1 M2 Pemasangan Rangka Plafond AsbesBahan

0.01 M3 Kayu Kelas II 9,260,442.180.1 kg Paku 2"-5" 28,400.00

Tenaga 0.15 Oh Kenek 79,200.000.25 Oh Tukang Kayu 123,750.00

Total1 M2 Pemasangan Plafond AsbesBahan

1 M2 Plafond 5 mm 25,047.000.01 kg Paku 1 cm 30,900.00

Tenaga0.03 Oh Kenek 79,200.000.07 Oh Tukang kayu 123,750.00

TotalAnalisa Biaya Konstruksi pekerjaan penutup atap

1 M2 pasang atap Span deckBahan

1.02 lbr Genteng Metal Maharoof, 92,238.30

Page 8: RAB Sekolah

0.2 kg Paku Skrup 88,650.05Jumlah (1)

Tenaga0.12 Oh Kenek 79,200.000.06 Oh Tukang kayu 123,750.00

0.006 Oh Kepala tukang 148,500.000.006 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M2 Pemasangan Atap seng gelombangBahan

4 ft Seng 11 Gelombang 11,107.800.2 kg Paku Seng RRT 24,066.90

Tenaga0.12 Oh Kenek 79,200.000.06 Oh Tukang kayu 123,750.00

0.006 Oh Kepala tukang 148,500.000.006 Oh Mandor 122,839.20

Total1 M Pasang atap nok/ bola-bola/ BubunganBahan

0.6 lbr Perabung Seng 17,550.000.04 kg Paku biasa 2"-5" 21,235.50

Jumlah (1)Tenaga

0.15 Oh Kenek 79,200.000.07 Oh Tukang Kayu 123,750.00

0.008 Oh Kepala tukang 148,500.000.006 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M Pasang ListplankBahan

0.25 btg Kayu 8" 146,361.600.04 kg Paku biasa 2"-5" 19,500.00

Jumlah (1)Tenaga

0.15 Oh Kenek 79,200.000.07 Oh Tukang Kayu 123,750.00

0.008 Oh Kepala tukang 148,500.000.006 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M Pasang Talang Air DatarBahan

1 M Seng Plat BJLS 31,708.330.02 kg Paku 1"-2" 21,235.500.01 M3 kayu kuat Kelas II 9,260,4420.25 kg Meni Besi 44,105

Tenaga0.15 Oh Kenek 79,200.00

0.4 Oh Tukang Kayu 123,750.00Total

Analisa biaya konstruksi pekerjaan BetonPembuatan Sloof Beton Bertulang (150 kg besi+bekisting) K300Bahan

0.27 M3 Kayu Sembarang 5,445,0002 kg Paku 2"-5" 21,235.50

0.6 lt Oli/Minyak 20,601.70150 kg Besi Beton Polos 12,375.00

3 kg Kawat Beton 12,806.648 zak Semen 3 roda 69,300.00

Page 9: RAB Sekolah

0.52 M3 Pasir Beton 118,800.000.78 M3 Kerikil 283,140.00

Tenaga4.5 org Pembantu Tukang 79,200.00

0.35 org Tukang Batu 123,750.001.56 org Tukang Kayu 123,750.00

1.4 org Tukang Besi 123,750.00Jumlah

Pembuatan Pondasi Beton Bertulang (175kg besi+bekisting) K300Bahan

0.2 M3 Kayu Sembarang 5,445,0001.5 kg Paku 2"-5" 21,235.500.4 lt Oli/Minyak 20,601.70

175 kg Besi Beton Polos 12,375.002.25 kg Kawat Beton 12,806.64448 kg Semen 3 roda 1,386.00

0.48 M3 Pasir Beton 118,800.000.56 M3 Kerikil 283,140.00

Tenaga4 org Pembantu Tukang 79,200.00

0.4 org Tukang Batu 123,750.001 org Tukang Kayu 123,750.001 org Tukang Besi 123,750.00

JumlahPembuatan Kolom (150 kg besi+bekisting) Bahan

0.7 M3 Kayu Sembarang 5,445,0004 kg Paku 2"-5" 21,235.502 lt Oli/Minyak 20,601.70

150 kg Besi Beton Polos 12,375.004.5 kg Kawat Beton 12,806.64

6.45 zak Semen 3 roda 69,300.000.52 M3 Pasir Beton 118,800.000.78 M3 Kerikil 283,140.00

3.5 lbr Multiplek 130,788.90Tenaga

7.3 org Pembantu Tukang 79,200.000.35 org Tukang Batu 123,750.00

3.3 org Tukang Kayu 123,750.002.1 org Tukang Besi 123,750.00

JumlahPembuatan Balok (125kg besi+bekisting) K-300Bahan

0.44 M3 Kayu Sembarang 5,445,0003.2 kg Paku 2"-5" 21,235.501.6 lt Oli/Minyak 20,601.70

125 kg Besi Beton Polos 12,375.002.25 kg Kawat Beton 12,806.646.45 kg Semen 3 roda 69,300.000.52 M3 Pasir Beton 118,800.000.78 M3 Kerikil 283,140.00

2.8 lbr Multiplek 130,788.9038 btg Balok dolken 1.5"/2" 54,885.60

Tenaga5.8 org Pembantu Tukang 79,200.00

0.35 org Tukang Batu 123,750.002.8 org Tukang Kayu 123,750.00

1.05 org Tukang Besi 123,750.00Jumlah

Analisa Pekerjaan Pengecetan1 M2 Pekerjaan pengecetan betonBahan

Page 10: RAB Sekolah

0.5 kg Cat tembok 30,709.800.1 kg Plamir 870.14

0.01 buah Rol cat 5,000.000.5 lbr ampelas 1,500.00

Jumlah Tenaga

0.06 Oh Kenek 79,200.000.2 Oh Tukang Cat 123,750.00

Jumlah Total (1+2)

1 M2 Pekerjaan pengecetan ListplankBahan

0.15 ltr Plitur 12,000.000.25 kg Dempul halus 16,000.00

1 lbr ampelas 1,500.00Jumlah

Tenaga0.05 Oh Kenek 79,200.000.15 Oh Tukang Cat 123,750.00

Jumlah Total (1+2)

Analisa Pekerjaan Sanitair1 Unit Pemasangan Kloset JongkokBahan

1 unit Kloset 144,183.600.12 zak Semen PC 69,300.000.01 M3 Pasir Pasang 113,850.00

Tenaga1 Oh Kenek 79,200.00

1.5 Oh Tukang Batu 123,750.00Total

1 Unit Pemasangan Floor DrainBahan

1 Unit Floor Drain 50,000.00Tenaga

0.01 Oh Kenek 79,200.000.1 Oh Tukang Batu 123,750.00

Total1 Unit Pembuatan Septic Tank

7.5 M3 Galian tanah 30,690.00Bahan

0.21 M3 Pasir Urug 99,000.002.25 M3 Lantai Kerja 91,851.00

15 M2 Pas. Batu Bata 1:2 116,860.790.3 M3 Plat Beton penutup 8,232,988.185.4 M Pipa PVC 4 inch 97,247.7030 M2 Plesteran 1:3 49,096.87

5 ikat Pasangan Ijuk 10,000.001.05 M3 Sirtu 148,500.00

9 m Pipa PVC 4 inch dilubang 97,247.701.13 M3 urugan kembali 14,731.20

Tenaga4 Oh kenek 79,200.003 Oh Tukang Batu 123,750.00

Total1 M Pemasangan Pipa Galvanis dia. 1/2 inchBahan

1.1 M Pipa Galvanis dia 1/2 Inci 10,672.200.33 mtrl Alat

Tenaga 0.05 Oh Kenek 79,200.000.09 Oh Tukang Pipa 123,750.00

Total

Page 11: RAB Sekolah

1 M Pemasangan Pipa PVC dia. 4 inchBahan

1.1 M Pipa PVC 19,449.54Perlengkapan

Tenaga0.08 Oh Kenek 79,200.000.14 Oh Tukang Pipa 123,750.00

Total1 Unit Pemasangan Pompa AirBahan

1 unit Pompa Air Sanyo 237 749,000.000.25 mtrl perlengkapan

Tenaga0.5 Oh Kenek 79,200.000.5 Oh Tukang Pipa 123,750.00

Total1 Unit Pemasangan Kran AirBahan

1 unit kran air 79,823.700.02 mtrl Perlengkapan

Tenaga0.01 Oh Kenek 79,200.00

0.1 Oh Tukang ledeng 123,750.00Total

Analisa Pekerjaan Elektrikal1 titik Pemasangan Stop KontakBahan

1 bh Stop Kontak 17,097.300.25 rol Kabel NYM 2x2,5 mm 22,106.70

0.2 Mtrl aksesori0.2 Oh Kenek 80,500.000.6 Oh Tukang Listrik 129,100.00

Total1 titik Pemasangan SaklarBahan

1 bh Saklar 4,573.800.25 rol Kabel NYM 2x2,5 mm 22,106.70

0.2 Mtrl aksesoriTenaga

0.2 Oh Kenek 80,500.000.6 Oh Tukang Listrik 129,100.00

TotalPemasangan Sekering dan MeteranBahan

1 bh Sekering Otomatis 16,879.502 M Kabel NYM 2x2,5 mm 7,000.001 Unit MCB 14,000.001 Unit Box Sekering 60,000.001 Unit Meteran 1200 Watt 3,600,000.00

Tenaga1 Oh Tukang Listrik 123,750.001 Oh Kenek 79,200.00

Total1 titik pemasangan Lampu Energy Saving 23 Watt PhilipsBahan

1 bh Lampu ES 23 Watt 43,400.001 bh cup lampu sorot 503,200.00

Tenaga0.1 Oh Tukang Listrik 123,750.00

Total

1 titik pemasangan Lampu TLBahan

Page 12: RAB Sekolah

1 bh Lampu TL 5,989.500.2 Mtrl Aksesori

Tenaga0.1 Oh Tukang Listrik 123,750.00

Total

Analisa Kusen dan Pintu1 Unit Pemasangan Pintu PVCBahan

1 Unit Pintu PVC 210,000.00Tenaga

0.25 Oh Kenek 79,200.000.25 Oh Tukang Kayu 123,750.00

TotalAnalisa Pekerjaan Lantai

1 M2 Pemasangan Tegel 20x20Bahan

1 M2 Tegel 20x20 0.000.16 zak Semen PC 69,300.000.02 M3 Pasir Pasang 113,850.000.02 kg Semen Warna 0.00

Tenaga0.25 Oh Kenek 79,200.000.12 Oh Tukang Batu 123,750.00

Total1 M2 Pemasangan Lantai Keramik 30x30Bahan

1 M2 Keramik Polos 30x30 70,785.000.16 zak Semen PC 69,300.000.02 M3 Pasir Pasang 113,850.000.02 kg Semen Warna 0.00

Tenaga0.25 Oh Kenek 79,200.000.12 Oh Tukang Batu 123,750.00

Total1 M2 Pemasangan Paving BlockBahan

50 bh Paving Block 2,439.360.05 M3 Pasir Urug 99,000.00

Tenaga0.25 Oh Kenek 79,200.000.12 Oh Tukang Batu 123,750.00

Total1 M2 Cor Rabat Beton Lantai 5 cmBahan

0.05 M3 Batu Kerikil 283,140.000.325 Zak Semen 69,300.00

0.01 M3 Pasir Pasangan 113,850.00Jumlah (1)

Tukang0.01 Oh Kepala Tukang 148,500.00

0.5 Oh Kenek 79,200.000.025 Oh Mandor 122,839.20

Jumlah (2)Total (1+2)

1 M2 Pemasangan Finishing Batu AlamBahan

1 M2 Batu Alam 81,675.000.16 zak Semen PC 69,300.000.02 M3 Pasir Pasang 113,850.000.02 kg Semen Warna 0.00

Tenaga 0.25 Oh Kenek 79,200.00

Page 13: RAB Sekolah

0.12 Oh Tukang Batu 123,750.00

1 M2 Pemasangan BondexBahan

Tenaga

Dibuat OlehPT. Belanti Barat Damai

0.000.00

Page 14: RAB Sekolah

272,250.003,465.00

47,520.001,188.002,831.40

272,250.001,274.13

24,750.007,920.00

633,448.53

119,790.00424.71

12,375.007,920.00

140,509.71

6,435.00

12,870.00

3,960.002,475.00

6,435.00

25,740.004,950.00

30,690.00

12,355.202,376.00

14,731.20

32,175.006,187.50

38,362.50

118,800.00118,800.00

19,305.001,228.39

20,533.39139,333.39

278,479.08

Page 15: RAB Sekolah

29,700.00

50,193.0048,262.50

406,634.58

169,884.00169,884.00

19,305.002,456.78

21,761.78191,645.78

420,462.90

279,972.0055,786.50

756,221.40

118,800.0074,250.00

193,050.00949,271.40

302,148.0061,776.00

246,331.80610,255.80

130,680.0030,937.50

3,712.509,827.14

175,157.14785,412.94

321,552.0061,776.00

220,849.20604,177.20

130,680.0030,937.50

3,712.509,827.14

175,157.14779,334.34

465,696.0064,152.00

229,343.40759,191.40

158,400.00

Page 16: RAB Sekolah

43,312.505,197.50

122,839.20329,749.20

1,088,940.60

84,332.166,370.652,060.17

90,702.81

23,760.0033,566.00

3,861.00614.20

61,801.20152,504.01

217,800.006,370.652,060.17

224,170.65

23,760.0033,566.00

3,861.00614.20

61,801.20285,971.85

84,332.168,494.204,120.34

81,675.00178,621.70

23,760.0040,837.50

4,900.50614.20

70,112.20248,733.90

217,800.008,494.204,120.34

81,675.00312,089.54

25,344.0040,837.50

4,900.50737.04

71,819.04383,908.58

99,099.00

Page 17: RAB Sekolah

88,745.587,128.00

187,844.58

51,480.0024,750.00

2,970.003,685.18

82,885.18270,729.76

99,099.0060,291.00

9,504.00159,390.00

51,480.0024,750.00

2,970.003,685.18

82,885.18242,275.18

99,099.0045,668.7010,810.80

144,767.70

51,480.0024,750.00

2,970.003,685.18

82,885.18227,652.88

99,099.0036,798.3011,048.40

135,897.30

51,480.0024,750.00

2,970.003,685.18

82,885.18218,782.48

49,549.5038,530.80

3,326.4088,080.30

25,344.0012,375.00

1,485.001,842.59

41,046.59129,126.89

Page 18: RAB Sekolah

49,549.5026,264.70

4,514.4075,814.20

25,344.0012,375.00

1,485.001,842.59

41,046.59116,860.79

49,549.5019,916.82

4,752.0069,466.32

25,344.0012,375.00

1,485.001,842.59

41,046.59110,512.91

49,549.5015,939.00

5,108.4065,488.50

25,344.0012,375.00

1,485.001,842.59

41,046.59106,535.09

17,907.121,544.40

19,451.52

15,840.0018,562.50

2,227.501,228.39

37,858.3957,309.91

11,808.722,019.60

13,828.32

15,840.0018,562.50

2,227.501,228.39

37,858.39

Page 19: RAB Sekolah

51,686.71

8,981.282,257.20

11,238.48

15,840.0018,562.50

2,227.501,228.39

37,858.3949,096.87

7,207.202,376.009,583.20

15,840.0018,562.50

2,227.501,228.39

37,858.3947,441.59

19,792.082,732.40

22,524.48

19,800.0024,750.00

2,970.001,535.49

49,055.4971,579.97

14,968.803,088.80

18,057.60

19,800.0024,750.00

2,970.001,535.49

49,055.4967,113.09

12,030.483,326.40

15,356.88

19,800.0024,750.00

2,970.001,535.49

49,055.4964,412.37

Page 20: RAB Sekolah

12,889.802,138.40

15,028.20

20,592.0024,750.00

2,970.001,596.91

49,908.9164,937.11

9,799.025,940.00

15,739.02

20,592.0024,750.00

2,970.001,596.91

49,908.9165,647.93

250,121.521,061.78

251,183.30

7,920.0024,750.00

3,712.50614.20

36,996.70288,179.99

11,112,530.62

475,200.001,856,250.00

13,443,980.62

92,604.422,840.00

11,880.0030,937.50

138,261.92

25,047.00309.00

2,376.008,662.50

36,394.50

94,083.07

Page 21: RAB Sekolah

17,730.01111,813.08

9,504.007,425.00

891.00737.04

18,557.04130,370.11

44,431.204,813.38

9,504.007,425.00

891.00737.04

67,801.62

10,530.00849.42

11,379.42

11,880.008,662.501,188.00

737.0422,467.54

33,846.96

36,590.40780.00

37,370.40

11,880.008,662.501,188.00

737.0422,467.54

59,837.94

31,708.33424.71 91851 20

92,604.4211,026.13

11,880.0049,500.00

197,143.59

1,470,150.0042,471.0012,361.02

1,856,250.0038,419.92 864000

554,400.00 837,025.20

Page 22: RAB Sekolah

61,776.00220,849.20

356,400.0043,312.50

193,050.00173,250.00

5,022,689.64Pembuatan Pondasi Beton Bertulang (175kg besi+bekisting) K300

1,089,000.0031,853.25

8,240.682,165,625.00

28,814.94620,928.00

57,024.00158,558.40

316,800.0049,500.00

123,750.00123,750.00

4,773,844.27

3,811,500.0084,942.0041,203.40

1,856,250.0057,629.88

446,985.0061,776.00

220,849.20457,761.15

578,160.0043,312.50

408,375.00259,875.00

8,328,619.13

2,395,800.0067,953.6032,962.72

1,546,875.0028,814.94

446,985.0061,776.00

220,849.20366,208.92

2,085,652.80

459,360.0043,312.50

346,500.00129,937.50

8,232,988.18

Page 23: RAB Sekolah

15,354.9087.0150.00

750.0016,241.91

4,752.0024,750.0029,502.00

45,743.91

1,800.004,000.001,500.007,300.00

3,960.0018,562.5022,522.50

29,822.50

144,183.608,316.001,138.50

79,200.00185,625.00

418,463.10

50,000.00

792.0012,375.00

63,167.00

230,175.00

20,790.00206,664.75

1,752,911.822,469,896.45

525,137.581,472,906.16

50,000.00155,925.00875,229.30

16,646.260.00

316,800.00371,250.00

8,464,332.32

11,739.423,913.14

3,960.0011,137.50

30,750.06

Page 24: RAB Sekolah

21,394.497,131.50

6,336.0017,325.00

52,186.99

749,000.00249,666.67

39,600.0061,875.00

1,100,141.67

79,823.701,596.47

792.0012,375.00

94,587.17

17,097.305,526.684,524.80

16,100.0077,460.00

120,708.77

4,573.805,526.682,020.10

16,100.0077,460.00

105,680.57

16,879.5014,000.0014,000.0060,000.00

3,600,000.00

123,750.0079,200.00

3,907,829.50

43,400.00503,200.00

12,375.00558,975.00

Page 25: RAB Sekolah

5,989.501,197.90

12,375.0019,562.40

210,000.00

19,800.0030,937.50

260,737.50

0.0011,088.00

2,277.000.00

19,800.0014,850.00

48,015.00

70,785.0011,088.00

2,277.000.00

19,800.0014,850.00

118,800.00

121,968.004,950.00

19,800.0014,850.00

161,568.00

14,157.0022,522.50

1,138.5037,818.00

1,485.0039,600.00

3,070.9844,155.98

81,973.98

81,675.0011,088.00

2,277.000.00

19,800.00

Page 26: RAB Sekolah

14,850.00129,690.00

Medan, 10 Desember 2013

Dibuat OlehPT. Belanti Barat Damai

0.000.00

Page 27: RAB Sekolah
Page 28: RAB Sekolah
Page 29: RAB Sekolah
Page 30: RAB Sekolah
Page 31: RAB Sekolah
Page 32: RAB Sekolah
Page 33: RAB Sekolah
Page 34: RAB Sekolah

1837020

Page 35: RAB Sekolah
Page 36: RAB Sekolah
Page 37: RAB Sekolah
Page 38: RAB Sekolah
Page 39: RAB Sekolah
Page 40: RAB Sekolah

DAFTAR HARGA DASAR BAHANNO URAIAN NILAI/HARGA SAT NILAI/HARGA SAT

UPAH

A Buruh 64,350 OH

B Pekerja 99,000 OH

C Tukang 123,750 OH

D Kepala Tukang 148,500 OH

E Mandor 122,839 OH

F Kenek 79,200 OH

A BAHAN PASANGAN

1 Pasir :

a.Pasir Beton /Cor 118,800 M3

b. Pasir Pasang 113,850 M3

c. Pasir Urug 99,000 M3

d. Kerikil Cor 148,500 M3

e. Tanah didatangkan 74,250 M3

f. Tanah Pilihan 141,570 M3

g. Sirtu 126,542 M3

h. Pitrum 124,908 M3

i. Split 283,140 M3

2 Batu Bata :

a.Batu bata biasa 708 bh

b. Batu bata biasa (5x11x22) Press

3 Batu Belah Uk. 10-15 cm 232,066 M3

4 Batu Kali Bulat 382,239 M3

5 Batu Padas 427,680 M3

6 Batu Pecah Uk. 2-3 cm 283,140 M3

Batu Pecah Uk. 3-5 cm 283,140 M3

Batu Pecah Uk. 5-7 cm 283,140 M3

7 Portland Cement

a. Semen type 1 69,300 zak 1,386

B BAHAN ATAP

1 Atap Asbes Semen Gelombang 17,097 ft

2 Atap Genteng (Metal Maharoof/Setara)

a. Tebal 0.26 mm tanpa peredam 67,736 kp

b. Tebal 0.26 mm dengan peredam 88,100 kp

c. Tebal 0.35 mm tanpa peredam 92,238 kp

d. Tebal 0.35 mm dengan peredam 107,375 kp

3 Atap Genteng Super Steel 92,238 kp

4 Atap Seng

5 a. 11 Gelombang 20 mm 11,108 ft

b. 9 gelombang 20 mm 12,197 ft

c. Lembar/11 Gelombang 39,600 lbr

6 Atap Seng Pertiwi/Setara

a. Tebal 0.3 mm warna 200,812 M2

b. Tebal 0.4 mm warna 222,047 M2

Page 41: RAB Sekolah

7 Atap Zincalum 0.3 mm polos 186,328

Atap Zincalum 0.4 mm polos 186,328

8 Atap Super Deck 12,197 ft9 Rabung 0.3mm warna 119,137 M

Rabung 0.4mm warna 159,647 M10 Meni Besi 44,105 kgC BAHAN KAYU

1 Kayu Bakar 132,531 M3

2 Damar Laut 14,059,426 Ton

3 Kuat Kelas 1 23,830,696 Ton

4 Kuat Kelas1 Dia. 4-6'/3 213,335 M

5 Kuat Kelas II 15,434,070 Ton 9,260,442

6 Kuat Kelas II Dia. 4-6"/3 113,692 M

7 Kuat Kelas III 10,377,843 Ton

8 Kuat Kelas III Dia. 4-6"/3 41,055 M

9 Kuat Kelas IV 7,078,500 Ton 5,445,000 M3

10 Kuat Kelas IV Dia. 4-6"/3 38,333 M

11 Triplek 12 mm 265,280 lbr

Triplek 9 mm 201,901 lbr

Triplek 6 mm 130,789 lbr

Triplek 3 mm 98,446 lbr

12 Kayu Kelas II (L= 4 m) 18,295 Inch

D BAHAN BESI

1 Besi tulangan 12,375 kg

2 Baja Profil 24,750 kg

3 Kawat Bronjong Licin 24,067 kg

4 Kawat 12,807 kg

E BAHAN PAKU

1 Paku kayu

a. Ukuran 3/4" 23,414 kg

b. Ukuran 1" 21,236 kg

c. Ukuran 1 1/2" 21,236 kg

d. Ukuran 2"-5" 21,236 kg

2 Paku Seng RRT 24,067 kg

3 Paku Skrup 88,650 kg

a. Warna 2,505 kg

b. Biasa 1,960 kg

c.Spesial 79,824 kg

4 Paku Jembatan 65,340 kg

F BAHAN FINISHING

1 Cat Dasar Kembang /Setara 28,859 klg kg

2 Cat Kilat Big Brand/Setara 64,469 klg kg

Cat Kilat Kuda Terbang/Setara 63,707 klg kg

3 Cat Mennie 38,333 klg ltr

4 Cat Perak 57,390 Kg

5 Cat Tembok Paragon/Setara 30,710 Kg

Cat Tembok Nippon/Setara 21,236 Kg

M2M3

Page 42: RAB Sekolah

Cat Tembok Vitex/ Setara 14,048 Kg

Cat Tembok Avian 55,757 Kg

Cat Genteng 122,186 klg

6 Cat Spesial 175,765 Kg

7 Kapur (basah) 1,307 bgks

8 Tinner 11,543 btl

9 Pernis 32,561 klg

10 Amplas Merk Taiyo 3,812 bh

11 Keramik 40 x 40 cm Edil Slin 20,691 bh

Keramik 40 x 40 cm Hercules 17,097 bh

Keramik 40 x 40 cm Garuda 15,464 bh

12 Keramik Polos Ukuran 40x40 70,785 M2

13 Finishing Batu alam 81,675 M2

14 Asbes 25,047 M2

15 Tegel 20x20 M2 bh

16 Minyak Bekisting 20,602 ltr

17 Semen Warna kg

18 Paving Blok 2,439 bh

G BAHAN SANITAIR

1 Pipa Besi Air Minum

Dia 0.5" 30,601 M

Dia 1,25" 72,745 M

Dia 1.5" 82,764 M

Dia 0.75" 38,333 M

Dia 1" 59,677 M

Dia 2" 347,718 M

Dia 3" 490,595 M

Dia 4" 890,693 M

2. Pipa Besi Hitam 0

Dia 0.5" 63,489 M

Dia 1.5" 143,204 M

Dia 0.75" 151,807 M

Dia 1" 131,551 M

Dia 2" 184,259 M

Dia 3" 419,810 M

Dia 4"x5mm 531,541 M

Dia 5"x5mm 470,448 M

Dia 6"x5mm 527,838 M

3 PVC United

Dia 0.5" 11,326 M

Dia 1.5" 92,238 M

Dia 0.75" 13,286 M

Dia 1" 18,295 M

Dia 2" 34,957 M

Dia 3" 64,578 M

Dia 4" 97,248 M

Dia 6" 203,861 M

4 Pipa Peralon

Page 43: RAB Sekolah

4" 141,570 Btg 23,595 M

3" 106,178 Btg 17,696 M

1.5" 74,379 Btg 12,396 M

1" 55,757 Btg 9,293 M

3/4" 42,689 Btg 7,115 M

5 Closet Jongkok Trasso DN/Setara 144,184 bh

Closet Jongkok Poreslin Setara 140,590 bh

Closet Porselin Super Itali KIA/setara 326,591 bh

6 Keran Air Stainless 79,824 bh

7 Stop Kran Kuningan 1.5 261,142 bh

Stop Kran Kuningan 1 56,846 bh

Stop Kran Kuningan 3/4 84,398 bh

8 Lem Pipa Merk Isarplas/Setara 11,870 bh

9 Isolasi Kran 1,416 bh

10 Bak Air Fiber 318,533 bh

11 Tangki Air 550 L 1,061,775 bh

12 Elbow 3/4" 4,247 bh

13 Elbow 3" PVC 23,958 bh

14 Elbow 4" PVC 5,336 bh

15 Tedos 3/4" PVC 6,861 bh

H BAHAN PEKERJAAN ELEKTRIKAL

1 10 W TL D 54 Philips 7,623 bh

2 18 W TL D 54 Philips 12,415 bh

3 Philips 40 Watt Bening 15,464 bh

4 Panasonic 18 watt 48,787 bh

5 2 x 40 Watt Komplet 126,433 bh

6 1 x 40 Watt Komplet 80,913 bh

7 32 Watt Philips (TL ring) 160 Watt 29,403 bh

8 Bolam Mercury 160 Watt 50,639 bh

9 Bolam Pijar 7,623 bh

10 Bolam Pijar Osram 40 Watt 4,574 bh

11 Cup Lampu Sorot 547,985 bh

12 Cup Lampu TL 5,990 bh

13 Stop Kontak 45,520 bh

14 Stop Kontak Beroco 17,097 set

15 Sekering Otomatis 16,880 bh

16 Trafo Dist 500 KVA, 3 Pasa 53,440,061 unit

17 Trafo 5 A 367,538 set

18 Time Switch 220 V 804,662 bh

19 Saklar RRT 3,376 bh

20 Saklar Piano Polsama Tunggal 4,574 bh

21 Saklar Piano Polsama Seri 5,009 bh

22 Fuse dan Base 227,057 bh

23 Ground Rod with Clamp 140,699 bh

24 Handle Saklar 42,035 bh

25 Isolator 40,511 bh

26 Kabel NYM 2 x 2.5 mm Lestari 549,836 bh

27 Kabel NYM 2 x 2.5 mm 15,246 bh

Page 44: RAB Sekolah

28 Kabel NYM 2 x 2.5 mm 22,107 bh

29 Kabel NYM 2 x 2.5 mm 170,211 bh

30 Kabel NYM 2 x 2.5 mm 24,611 bh

31 Kabel NYM 2 x 2.5 mm 16,008 bh

32 Kabel NYM 2 x 2.5 mm 8,059 bh

33 Kontaktor SN 65 972,695 bh

34 Pitting Batu 250 W 64,796 bh

35 Nt Fuse 100 A 751,301 bh

Page 45: RAB Sekolah

DAFTAR HARGA DASAR BAHANKETERANGAN

Per hari

Per hari

Per hari

Per hari

Per hari

Per hari

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Page 46: RAB Sekolah

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Page 47: RAB Sekolah

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Didatangkan

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Page 48: RAB Sekolah

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Didatangkan

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Page 49: RAB Sekolah

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Dilokasi Kerja

Page 50: RAB Sekolah

RENCANA ANGGARAN BIAYAPekerjaan : Pembangunan Balai Pemuda Lokasi : Kabupaten Aceh Jaya Anggaran : Owner

NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT.

A PEKERJAAN PERSIAPAN1 Unit 1.00 Rp 1,200,000.00 2 Jaring Pengaman m2 375.00 Rp 50,000.00 3 Pagar Keliling/Pengaman m 96.00 Rp 253,379.41 4 Direksi Keet dan gudang Unit 1.00 Rp 15,000,000.00

Total

B PEKERJAAN PONDASI DAN TANAH1 Pasangan Batu Kali M3 21.20 Rp 949,271.40 2 Pondasi Bor Pile M 462.00 Rp 1,650,000.00 3 Pile Cap/Poor M3 16.63 Rp 5,022,689.64 4 Timbunan Tanah Pilihan M3 440.00 Rp 191,645.78

Total

C PEKERJAAN KONSTRUKSI BETONI Lantai 1

1 Kolom M3 25.26 Rp 8,328,619.13 2 Sloof M3 25.28 Rp 5,022,689.64 3 Lantai Cor Beton bawah keramik M3 23.83 Rp 779,334.34 4 Dinding Bata M2 780.00 Rp 116,860.79 5 Plesteran Dinding M2 1,560.00 Rp 51,686.71 6 Tangga M3 11.42 Rp 8,232,988.18

II Lantai 21 Kolom M3 22.25 Rp 8,328,619.13 2 Balok M3 66.81 Rp 8,232,988.18 3 Plat Lantai M3 45.52 Rp 8,232,988.18 4 Dinding Bata M2 774.00 Rp 116,860.79 5 Plesteran Dinding M2 1,548.00 Rp 51,686.71 6 Tangga M3 11.42 Rp 8,232,988.18 7 Bondex + Wiremesh M8 terpasang M2 478.50 Rp 250,000.00

III Lantai 31 Kolom M3 24.68 Rp 8,328,619.13 2 Balok M3 69.78 Rp 8,232,988.18 3 Plat Lantai M3 18.62 Rp 8,232,988.18 4 Dinding Bata M2 794.00 Rp 774.00 5 Plesteran Dinding M2 1,588.00 Rp 51,686.71 6 Tangga M3 11.42 Rp 8,232,988.18 7 Bondex + Wiremesh M8 terpasang M2 478.50 Rp 250,000.00

IV Lantai 41 Kolom M3 24.68 Rp 8,328,619.13 2 Balok M3 69.78 Rp 8,232,988.18 3 Plat Lantai M3 203.76 Rp 8,232,988.18 4 Dinding Bata M2 794.00 Rp 774.00 5 Plesteran Dinding M2 1,588.00 Rp 51,686.71 6 Tangga M3 11.42 Rp 8,232,988.18 7 Bondex + Wiremesh M8 terpasang M2 478.50 Rp 250,000.00

V Lantai 51 Kolom M3 9.46 Rp 8,328,619.13 2 Balok M3 69.78 Rp 8,232,988.18 3 Plat Lantai M3 203.76 Rp 8,232,988.18 4 Tangga M3 11.42 Rp 8,232,988.18 5 Dinding Bata M2 732.40 Rp 774.00 6 Plesteran Dinding M2 1,464.80 Rp 51,686.71

Page 51: RAB Sekolah

Total

D PEKERJAAN ATAP1 Rangka Atap Kg 3,756.34 Rp 24,750.00 2 Rink Balok M3 23.16 Rp 8,232,988.18 3 Bubungan M 27.00 Rp 33,846.96 4 Talang M 54.00 Rp 197,143.59 5 Plat Atap M3 14.04 Rp 8,232,988.18 6 Penutup Atap M2 310.50 Rp 130,370.11

Total

Medan, 10 Desember 2013

Dibuat OlehPT. Belanti Barat Damai

Page 52: RAB Sekolah

RENCANA ANGGARAN BIAYA

JUMLAH

Rp 1,200,000.00 Rp 18,750,000.00 Rp 24,324,423.55 Rp 15,000,000.00 Rp 59,274,423.55

Rp 20,119,807.32 Rp 762,300,000.00 Rp 83,537,374.11 Rp 84,324,144.96

Rp 950,281,326.40

Rp 210,380,919.32 Rp 126,948,480.68 Rp 18,569,978.56 Rp 91,151,414.64 Rp 80,631,270.72 Rp 93,998,331.32

Rp 185,311,775.73 Rp 550,045,940.52 Rp 374,765,622.10 Rp 90,450,249.91 Rp 80,011,030.18 Rp 93,998,331.32 Rp 119,625,000.00

Rp 205,550,320.23 Rp 574,497,915.42 Rp 153,298,239.97 Rp 614,556.00 Rp 82,078,498.66 Rp 93,998,331.32 Rp 119,625,000.00

Rp 205,550,320.23 Rp 574,497,915.42 Rp 1,677,553,672.21 Rp 614,556.00 Rp 82,078,498.66 Rp 93,998,331.32 Rp 119,625,000.00

Rp 78,809,558.56 Rp 574,497,915.42 Rp 1,677,553,672.21 Rp 93,998,331.32 Rp 566,877.60 Rp 75,710,695.74

Page 53: RAB Sekolah

Rp 8,600,606,551.30

Rp 92,969,415.00 Rp 190,634,841.38 Rp 913,867.79 Rp 10,645,753.87 Rp 115,599,387.08 Rp 40,479,919.22 Rp 451,243,184.34

Medan, 10 Desember 2013

Dibuat OlehPT. Belanti Barat Damai

Rp 451,243,184.34

Page 54: RAB Sekolah

REKAPITULASI RAB

Pekerjaan : Pembangunan Balai Pemuda Lokasi : Kabupaten Aceh Jaya Anggaran : Owner

NO URAIAN PEKERJAAN

A PEKERJAAN PERSIAPANB PEKERJAAN PONDASI DAN TANAHC PEKERJAAN KONSTRUKSI BETON

D PEKERJAAN ATAP

TOTALDIBULATKAN

SEMBILAN RATUS SEMBILAN PULUH JUTA EMPAT RATUS RIBU RUPIAH

Page 55: RAB Sekolah

REKAPITULASI RAB

JUMLAH

Rp 59,274,423.55 Rp 950,281,326.40 Rp 8,600,606,551.30

Rp 451,243,184.34

Rp 10,061,405,485.59

SEMBILAN RATUS SEMBILAN PULUH JUTA EMPAT RATUS RIBU RUPIAH

Medan, 10 Desember 2013

Dibuat Oleh PT. Belanti Barat Damai

Page 56: RAB Sekolah

RENCANA ANGGARAN BIAYAPekerjaan : Pembangunan Balai Pemuda Lokasi : Kabupaten Aceh Jaya Anggaran : Owner

NO URAIAN PEKERJAAN SAT VOLUME

A PEKERJAAN PERSIAPAN1 pengukuran dan pemasangan bowplank M 50.832 gudang dan barak pekerja Ls 1.003 administrasi Ls 1.004 transportasi Ls 1.00

B PEKERJAAN TANAH 1 galian tanah 96.362 urugan kembali bekas galian M³ 61.083 urugan tanah M³ 38.784 urugan pasir M³ 8.10

C PEKERJAAN PASANGAN/PLASTERAN 1 pas. Batu kosng 8.542 pas. Batu gunung M³ 24.753 pas. Batu bata trasram 1pc:2pc 15.054 pas. Batu bata dinding 1pc:4pc 158.745 Unit 2.006 plasteran batu bata trasram 1pc:2pc 11.507 plasteran batu bata dinding 1pc:4pc M² 252.568 pas. Kloset jongkok Bh 2.009 pas. Kran dia 1/2" Bh 2.00

10 pas. Floor drain Bh 2.00

D PEKERJAAN BETON BETULANG 1 Tapak 0.882 stik kolom M³3 beton sloof 18/25 cm M³ 2.164 beton sloof 15/20 cm M³ 0.245 beton kolom 15/15 cm M³ 1.026 ring balk 15/20 cm M³ 1.297 ring balk 15/15 cm M³ 0.188 balok top geuvel M³9 balok latai M³

E PEKERJAAN LANTAI DAN KERAMIK/DINDING

1 lantai beton tumbuk 96.002 lantai keramik 40x40 cm M² 91.413 lantai 20x20 cm (anti slip) M² 2.63

pas. Batu bata bak air 0,3 m³ dilapisi kramik

Page 57: RAB Sekolah

4 lantai selasar keramik 40x40 cm M² 23.685 dinding keramik 20x25 M² 13.82

F PEKERJAAN KUSEN,PINTU,JENDELA & VENTILASI1 pek. Kusen alumunium M 25.202 daun pintu unit 4.003 engsel pintu bh 8.004 penggantung + kunci tanam bh 4.005 daun jendela + kaca Unit 6.006 hak angun bh 6.007 engsel jendela bh 12.008 pacok jendela bh 6.009 ventilasi + kaca bh 4.00

10 engsel ventilasi bh 8.0011 pacok ventilasi bh 4.0012 daun jendela + kaca (km/wc) bh 2.00

G PEKERJAAN PLAFOND DAN ATAP1 Plafon Plywood 4mm + rangka kayu 103.652 List kayu profil M² 103.653 Rangka Atap Baja Ringan M² 133.684 Atap Genteng Metal 0,3 M² 133.685 Rabung Genteng Metal 0,35 M 13.106 Listplank 2,5x25 M 52.90

H PEKERJAAN PENGECETAN1 Pelerjaan Cat Bidang Kayu2 Pekerjaan Cat Bidang Tembok Dan Plafond M²

I INSTALASI LISTRIK1 Lampu TL 20 watt lengkap penutup bh 6.002 Lampu Philips 18 watt bh 2.003 Lampu Philips 20 watt bh 6.004 Instalasi Titik Penerangan, Instal Instalasi Termasuk Ttk 12.00

Kabel NYA 3x2, 5mm dalam Pipa PVC FittingLampu dan Kelengkapan Instalasi Terpasang

5 Instalasi Titik Kontak, Instalasi Termasuk Kabel Ttk 6.00NYA 3x2, 5mm dalam Pipa PVC, Kotak

6 Saklar Lampu (Multi 2 Gang Merk Brocco) Unit 6.007 Penyambungan Arus Listrik Ls 1.008 Pemasangan Daya Listrik PLN 4 Ampere Ls 1.00

J PEKERJAAN AIR KOTOR & AIR BERSIH1 Septi Tank + Wets Ls 1.002 Pompa Air dia 1" Merk. PANASONIC Ls 1.00

Page 58: RAB Sekolah

3 Instalasi Air Bersih M 17.804 Instatlasi Air Kotor M 13.005 Sumur (12 Cincin) @50 cm M 6.00

K PEKERJAAN LAIN-LAIN1 Pintu Besi Ls 1.002 Reiling Raam Ls 1.003 Lantai Raam Ls 1.004 Tangga Raam Ls 1.005 Finishing Ls 1.00

Page 59: RAB Sekolah

RENCANA ANGGARAN BIAYA

HARGA SAT. JUMLAH

Rp 39,313.73 Rp 1,998,159.64 Rp 1,500,000.00 Rp 1,500,000.00 Rp 1,000,000.00 Rp 1,000,000.00 Rp 2,000,000.00 Rp 2,000,000.00

TOTAL Rp 6,498,159.64

Rp 17,880.00 Rp 1,722,849.75 Rp 8,750.00 Rp 534,423.75 Rp 79,244.40 Rp 3,073,097.83 Rp 127,075.60 Rp 1,029,185.28

TOTAL Rp 6,359,556.62

Rp 250,646.10 Rp 2,140,204.39 Rp 516,189.59 Rp 12,775,692.35 Rp 94,104.73 Rp 1,416,276.19 Rp 87,046.23 Rp 13,817,370.37 Rp 585,323.40 Rp 1,170,646.80 Rp 24,733.12 Rp 284,430.88 Rp 19,508.00 Rp 4,926,955.11 Rp 217,191.93 Rp 434,383.86 Rp 55,738.00 Rp 111,476.00 Rp 45,340.00 Rp 90,680.00

TOTAL Rp 37,168,115.94

Rp 2,053,760.59 Rp 1,803,201.80 Rp 7,239,793.18 Rp - Rp 4,045,813.49 Rp 8,738,957.14 Rp 5,507,417.14 Rp 1,321,780.11 Rp 7,239,793.18 Rp 7,417,892.09 Rp 5,165,534.97 Rp 6,663,540.11 Rp 5,825,198.22 Rp 1,048,535.68 Rp 7,416,881.92 Rp - Rp 6,180,350.89 Rp -

TOTAL Rp 26,993,906.93

Rp 69,145.40 Rp 6,637,958.40 Rp 64,484.70 Rp 5,894,804.37 Rp 119,588.98 Rp 313,921.07

Page 60: RAB Sekolah

Rp 65,484.70 Rp 1,550,677.70 Rp 101,924.98 Rp 1,408,093.60

TOTAL Rp 15,805,455.13

Rp 125,000.00 Rp 3,150,000.00 Rp 700,000.00 Rp 2,800,000.00 Rp 3,000.00 Rp 24,000.00 Rp 50,000.00 Rp 200,000.00 Rp 372,000.00 Rp 2,232,000.00 Rp 5,000.00 Rp 30,000.00 Rp 3,000.00 Rp 36,000.00 Rp 5,000.00 Rp 30,000.00 Rp 175,000.00 Rp 700,000.00 Rp 3,000.00 Rp 24,000.00 Rp 5,000.00 Rp 20,000.00 Rp 222,000.00 Rp 444,000.00

TOTAL Rp 9,690,000.00

Rp 103,201.18 Rp 10,696,802.31 Rp 10,392.94 Rp 1,077,228.23 Rp 97,500.00 Rp 13,033,507.50 Rp 53,447.00 Rp 7,144,634.62 Rp 40,002.22 Rp 524,029.08 Rp 55,553.69 Rp 2,938,679.09

TOTAL Rp 35,414,880.83

Rp 25,796.22 Err:522 Rp 17,052.49 Err:522

TOTAL Err:522

Rp 75,000.00 Rp 450,000.00 Rp 27,000.00 Rp 54,000.00 Rp 34,000.00 Rp 204,000.00 Rp 110,000.00 Rp 1,320,000.00

Rp 110,000.00 Rp 660,000.00

Rp 15,000.00 Rp 90,000.00 Rp 1,000,000.00 Rp 1,000,000.00 Rp 2,000,000.00 Rp 2,000,000.00

TOTAL Rp 5,778,000.00

Rp 4,400,000.00 Rp 4,400,000.00 Rp 525,000.00 Rp 525,000.00

Page 61: RAB Sekolah

Rp 60,000.00 Rp 1,068,000.00 Rp 80,000.00 Rp 1,040,000.00 Rp 64,000.00 Rp 384,000.00

TOTAL Rp 7,417,000.00

Rp 1,300,000.00 Rp 1,300,000.00 Rp 1,250,000.00 Rp 1,250,000.00 Rp 300,000.00 Rp 300,000.00 Rp 125,000.00 Rp 125,000.00 Rp 1,500,000.00 Rp 1,500,000.00

TOTAL Rp 4,475,000.00