Page 1: RAB Reza.xlsx

REKAPITULASIRENCANA ANGGARAN BIAYA (RAB)

Proyek :Pekerjaan :Lokasi :Tahun Anggaran :

No. URAIAN

I PRELIMINARY

II PEKERJAAN STRUKTUR

III FINISHING ARSITEKTUR

IV INSTALASI LISTRIK

V SANITASI

VI SITE WORK

TOTALDIBULATKAN

Terbilang

Page 2: RAB Reza.xlsx

REKAPITULASIRENCANA ANGGARAN BIAYA (RAB)

HARGA SATUANBahan/Material Upah

Rp - Rp -

Rp 22,368,016.75 Rp 3,884,408.61

Rp 6,153,270.69 Rp 2,672,178.48

Rp 2,565,800.00 Rp 810,000.00

Rp 2,160,619.15 Rp 940,785.00

Rp 1,022,727.64 Rp 402,575.90

TOTALDIBULATKAN

Page 3: RAB Reza.xlsx

REKAPITULASIRENCANA ANGGARAN BIAYA (RAB)

JUMLAH

Rp 26,252,425.36

Rp 8,825,449.17

Rp 3,375,800.00

Rp 3,101,404.15

Rp 1,425,303.54

Rp 42,980,382.22 Rp 42,900,000.00

Page 4: RAB Reza.xlsx

RENCANA ANGGARAN BIAYA (RAB)

Proyek :Pekerjaan :Lokasi :Thn. Anggaran :

No. URAIAN

I PRELIMINARY1.1 Pekerjaan Pembersihan Area Pekerjaan1.2 Izin Mendirikan Bangunan (IMB)1.3 Air dan Listrik Kerja1.4 Administrasi

JumlahSub Total I

II PEKERJAAN STRUKTUR 2.1. Pondasi

2.1.1 Pondasi Batu Gunung2.1.1.1 Galian Tanah 2.1.1.2 Urugan Tanah Kembali2.1.2.3 Urugan Pasir2.1.2.4 Pemasangan Batu Kosong2.1.1.5 Pemasangan Batu Kali

Jumlah2.2 Sloef Praktis 15/20

B. Besi Vol. Toleransi 2.2.1 Cor Beton + Bakesting146.51 0.80 1.05 2.2.2 Besi Beton Polos

Jumlah2.3 Kolom Praktis 15/15

B. Besi Vol. Toleransi 2.3.1 Cor Beton + Bakesting225.45 0.54 1.05 2.3.2 Besi Beton Polos

Jumlah2.4 Ringbalk

B. Besi Vol. Toleransi 2.4.1 Cor Beton + Bakesting146.51 0.80 1.05 2.4.2 Besi Beton Polos

Jumlah2.5 Pekerjaan Plat

2.5.1 Plat LantaiB. Besi Vol. Toleransi 2.5.1.1 Cor Beton + Bakesting

0.00 1.05 2.5.1.2 Besi Beton Polos2.5.2 Plat Atap

B. Besi Vol. Toleransi 2.5.2.1 Cor Beton + Bakesting0.00 1.05 2.5.2.2 Besi Beton Polos

Jumlah2.6 Pekerjaan Rangka Atap

2.6.1 Rangka Atap Baja Ringan2.6.2 Lisplank Atap 2.6.3 Pekerjaan Atap Rangka Besi Hollow + Penutup Fiberglass

JumlahSub Total II

Page 5: RAB Reza.xlsx

III FINISHING ARSITEKTUR3.1. Lantai

3.1.1 Pekerjaan Lantai3.1.1.1 Urugan Pasir Bawah Lantai3.1.1.2 Pekerjaan Rabat Beton Bawah Lantai3.1.1.3 Pas. Tegel Lantai 30X30 3.1.1.4 Pas. Tegel Lantai 20X20

Jumlah3.1.2 Pekerjaan Dinding + Kolom

3.1.2.1 Pas. Dinding Batu Bata 1/2 BT (1 : 5)3.1.2.2 Pas. Dinding Batu Bata 1/2 BT (1 : 3)3.1.2.3 Plesteran Dinding + Kolom 1 : 53.1.2.4 Plesteran Dinding + Kolom 1 : 33.1.2.5 Pas. Tegel Dinding KM (20X20)3.1.2.6 Pas. Tegel Plint Dinding3.1.2.7 Acian Dinding + Kolom

Jumlah3.1.3 Pekerjaan Plafond

3.1.3.1 Rangka Plafond 3.1.3.2 Plafond Gypsumboard, t=9 mm3.1.3.3 Lis Plafon

Jumlah3.1.4 Pekerjaan Pintu dan Jendela Lengkap dengan Aksesories

3.1.4.1 Type P1a3.1.4.2 Type P1b

Jumlah3.1.5 Pekerjaan Pengecatan

3.1.5.1 Cat Tembok 3.1.5.2 Cat Plafond3.1.5.3 Cat Kayu

Jumlah3.2 Finishing Arsitektur Atap

3.2.1 Penutup Atap Metal Roof3.2.2 Pekerjaan Waterproofing3.2.3 Pasangan Nok Bubungan

JumlahSub Total III

IV INSTALASI LISTRIK 4.1 Instalasi Listrik Lantai 01

4.1.1 Panel4.1.1.1 Sambungan Dari PLN + Meterean4.1.1.2 Panel MCB

Jumlah4.1.2 Instalasi

4.1.2.2 Inst. Penerangan & Stop KontakNYM 3X2,5 mm2 ex Supreme

Jumlah4.1.3 Armature

4.1.3.1 Stop Kontak ex Clipsal4.1.3.2 Sakelar Tunggal ex Clipsal4.1.3.3 Sakelar Ganda ex Clipsal

Jumlah

Page 6: RAB Reza.xlsx

4.1.4 Fixture4.1.4.1 Lampu DL XL 18 watt ex. Phillips + Fitting4.1.4.2 Lampu Down Light Pijar 10 watt4.1.4.3 Lampu TL Bulat 40 watt ex. Phillips

JumlahSub Total IV

V SANITASI5.1 Instalasi

5.1.1 Inst. Air Bersih (Galv. 3/4") lengk. dgn Fitting, Acc, Mat. Bantu5.1.2 Inst. Disposal Cair (PVC. 3") lengk. dgn Fitting, Acc, Mat. Bantu5.1.3 Inst. Disposal Padat (PVC. 4") lengk. dgn Fitting, Acc, Mat. Bt.

Jumlah5.2 Sanitary

5.2.1 Kloset Jongkok5.2.2 Floor Drain5.2.3 Kran Air5.2.4 Septiktank 5.2.5 bak mandi

JumlahSub Total V

VI SITE WORK6.1 Timbunan Tanah

6.1.1 Timbunan TanahJumlah

6.2 Saluran Drainase6.2.1 Saluran Keliling Bangunan6.2.2 Bak Kontrol

JumlahSub Total VI

Page 7: RAB Reza.xlsx

RENCANA ANGGARAN BIAYA (RAB)

URAIAN VOL. SAT.HARGA SATUAN

Bahan/Material Upah

Pekerjaan Pembersihan Area Pekerjaan Rp - Izin Mendirikan Bangunan (IMB) Rp -

Rp - Rp -

JumlahSub Total I

Galian Tanah 19.69 Rp - Rp 28,000.00 Urugan Tanah Kembali 4.92 Rp - Rp 13,420.00 Urugan Pasir 17.33 Rp 120,000.00 Rp 19,000.00 Pemasangan Batu Kosong 3.00 Rp 215,400.00 Rp 81,755.00 Pemasangan Batu Kali 7.49 Rp 524,814.00 Rp 144,200.00

Jumlah

Cor Beton + Bakesting 0.80 Rp 981,735.04 Rp 514,970.00 123.45 kg Rp 15,457.50 Rp 1,041.50

Jumlah

Cor Beton + Bakesting 0.54 Rp 989,231.40 Rp 520,985.00 127.83 kg Rp 15,457.50 Rp 1,041.50

Jumlah

Cor Beton + Bakesting 0.80 Rp 728,036.40 Rp 61,120.00 123.45 kg Rp 80,364.00 Rp 4,920.00

Jumlah

Cor Beton + Bakesting Rp 1,485,678.20 Rp 522,185.00 Besi Beton Polos 0.00 kg Rp 15,457.50 Rp 1,041.50

Cor Beton + Bakesting Rp 1,485,678.20 Rp 522,185.00 Besi Beton Polos 0.00 kg Rp 15,457.50 Rp 1,041.50

Jumlah

Rangka Atap Baja Ringan

Pekerjaan Atap Rangka Besi Hollow + Penutup FiberglassJumlah

Sub Total II

m3

m3

m3

m3

m3

m3

m3

m3

m3

m3

m2

m1

m2

Page 8: RAB Reza.xlsx

Urugan Pasir Bawah Lantai 2.86 Rp 120,000.00 Rp 19,000.00 Pekerjaan Rabat Beton Bawah Lantai 1.00 Rp 700,577.00 Rp 128,125.00 Pas. Tegel Lantai 30X30 11.14 Rp 133,734.40 Rp 67,075.00 Pas. Tegel Lantai 20X20 2.09 Rp 76,986.40 Rp 67,075.00

JumlahPekerjaan Dinding + Kolom

Pas. Dinding Batu Bata 1/2 BT (1 : 5) 2.61 Rp 50,743.00 Rp 28,150.00 Pas. Dinding Batu Bata 1/2 BT (1 : 3) 1.04 Rp 58,594.00 Rp 28,150.00 Plesteran Dinding + Kolom 1 : 5 5.22 Rp 10,376.40 Rp 25,675.00 Plesteran Dinding + Kolom 1 : 3 2.09 Rp 13,909.80 Rp 25,675.00 Pas. Tegel Dinding KM (20X20) 7.65 Rp 103,597.60 Rp 33,700.00 Pas. Tegel Plint Dinding 0.51 Rp 34,760.52 Rp 17,940.00 Acian Dinding + Kolom 7.31 Rp 7,272.00 Rp 18,842.50

Jumlah

Rangka Plafond 8.37 Rp 108,549.20 Rp 37,625.00 Plafond Gypsumboard, t=9 mm 8.37 Rp 37,097.80 Rp 10,725.00

8.00 Rp 103,256.56 Rp 23,875.00 Jumlah

Pekerjaan Pintu dan Jendela Lengkap dengan Aksesories1.00 bh1.00 bh

JumlahPekerjaan Pengecatan

Cat Tembok 25.65 Rp 7,400.00 Rp 6,773.50 Cat Plafond 8.37 Rp 9,840.00 Rp 16,425.00

Rp 46,533.00 Rp 5,695.00 Jumlah

Penutup Atap Metal RoofPekerjaan WaterproofingPasangan Nok Bubungan m'

JumlahSub Total III

Sambungan Dari PLN + Meterean 1.00 set Rp 1,500,000.00 Rp 90,000.00 Panel MCB 1.00 set Rp 750,000.00 Rp 90,000.00

Jumlah

Inst. Penerangan & Stop KontakNYM 3X2,5 mm2 ex Supreme 1.00 ttk Rp 94,600.00 Rp 90,000.00

Jumlah

Stop Kontak ex Clipsal 1.00 bh Rp 21,500.00 Rp 90,000.00 Sakelar Tunggal ex Clipsal 1.00 bh Rp 5,500.00 Rp 90,000.00 Sakelar Ganda ex Clipsal 1.00 bh Rp 9,200.00 Rp 90,000.00

Jumlah

m3

m3

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m2

m3

m2

m2

Page 9: RAB Reza.xlsx

Lampu DL XL 18 watt ex. Phillips + Fitting 1.00 set Rp 60,000.00 Rp 90,000.00 Lampu Down Light Pijar 10 watt 1.00 set Rp 25,000.00 Rp 90,000.00 Lampu TL Bulat 40 watt ex. Phillips 1.00 set Rp 100,000.00 Rp 90,000.00

JumlahSub Total IV

Inst. Air Bersih (Galv. 3/4") lengk. dgn Fitting, Acc, Mat. Bantu m'Inst. Disposal Cair (PVC. 3") lengk. dgn Fitting, Acc, Mat. Bantu m'Inst. Disposal Padat (PVC. 4") lengk. dgn Fitting, Acc, Mat. Bt. m'

Jumlah

1.00 bh Rp 210,482.00 Rp 80,750.00 1.00 bh Rp 36,400.00 Rp 745.00 1.00 bh Rp 65,500.00 Rp 70,000.00 1.00 bh Rp 1,643,389.15 Rp 573,990.00 1.00 bh Rp 204,848.00 Rp 215,300.00

JumlahSub Total V

Rp 14,160.00 Rp 19,000.00 Jumlah

Saluran Keliling Bangunan 5.30 m' Rp 166,928.80 Rp 25,039.32 1.00 bh Rp 138,005.00 Rp 269,867.50

JumlahSub Total VI

m3

Page 10: RAB Reza.xlsx

RENCANA ANGGARAN BIAYA (RAB)

JUMLAH HARGA JUMLAHBahan/Material Upah BAHAN+UPAH

Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp -

Rp - Rp 551,264.00 Rp 551,264.00 Rp - Rp 66,053.24 Rp 66,053.24 Rp 2,080,080.00 Rp 329,346.00 Rp 2,409,426.00 Rp 645,338.40 Rp 244,937.98 Rp 890,276.38 Rp 3,930,856.86 Rp 1,080,058.00 Rp 5,010,914.86 Rp 6,656,275.26 Rp 2,271,659.22 Rp 8,927,934.48

Rp 787,842.37 Rp 413,263.42 Rp 1,201,105.79 Rp 1,908,280.94 Rp 128,576.72 Rp 2,036,857.66 Rp 2,696,123.31 Rp 541,840.14 Rp 3,237,963.45

Rp 534,184.96 Rp 281,331.90 Rp 815,516.86 Rp 1,975,974.92 Rp 133,137.82 Rp 2,109,112.74 Rp 2,510,159.87 Rp 414,469.72 Rp 2,924,629.60

Rp 584,249.21 Rp 49,048.80 Rp 633,298.01 Rp 9,921,209.09 Rp 607,390.73 Rp 10,528,599.83 Rp 10,505,458.30 Rp 656,439.53 Rp 11,161,897.84

Rp - Rp - Rp - Rp - Rp - Rp -

Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp -

Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp 22,368,016.75 Rp 3,884,408.61 Rp 26,252,425.36

Page 11: RAB Reza.xlsx

Rp 343,440.00 Rp 54,378.00 Rp 397,818.00 Rp 701,767.98 Rp 128,342.81 Rp 830,110.79 Rp 1,489,466.88 Rp 747,047.81 Rp 2,236,514.69 Rp 161,094.04 Rp 140,354.44 Rp 301,448.48 Rp 2,695,768.90 Rp 1,070,123.06 Rp 3,765,891.97

Rp 132,439.23 Rp 73,471.50 Rp 205,910.73 Rp 61,172.14 Rp 29,388.60 Rp 90,560.74 Rp 54,164.81 Rp 134,023.50 Rp 188,188.31 Rp 29,043.66 Rp 53,609.40 Rp 82,653.06 Rp 792,521.64 Rp 257,805.00 Rp 1,050,326.64 Rp 17,727.87 Rp 9,149.40 Rp 26,877.27 Rp 53,143.78 Rp 137,700.99 Rp 190,844.77 Rp 1,140,213.12 Rp 695,148.39 Rp 1,835,361.51

Rp 908,556.80 Rp 314,921.25 Rp 1,223,478.05 Rp 310,508.59 Rp 89,768.25 Rp 400,276.84 Rp 826,052.48 Rp 191,000.00 Rp 1,017,052.48 Rp 2,045,117.87 Rp 595,689.50 Rp 2,640,807.37

Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp -

Rp 189,810.00 Rp 173,740.28 Rp 363,550.28 Rp 82,360.80 Rp 137,477.25 Rp 219,838.05 Rp - Rp - Rp - Rp 272,170.80 Rp 311,217.53 Rp 583,388.33

Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp 6,153,270.69 Rp 2,672,178.48 Rp 8,825,449.17

Rp 1,500,000.00 Rp 90,000.00 Rp 1,590,000.00 Rp 750,000.00 Rp 90,000.00 Rp 840,000.00 Rp 2,250,000.00 Rp 180,000.00 Rp 2,430,000.00

Rp 94,600.00 Rp 90,000.00 Rp 184,600.00 Rp 94,600.00 Rp 90,000.00 Rp 184,600.00

Rp 21,500.00 Rp 90,000.00 Rp 111,500.00 Rp 5,500.00 Rp 90,000.00 Rp 95,500.00 Rp 9,200.00 Rp 90,000.00 Rp 99,200.00 Rp 36,200.00 Rp 270,000.00 Rp 306,200.00

Page 12: RAB Reza.xlsx

Rp 60,000.00 Rp 90,000.00 Rp 150,000.00 Rp 25,000.00 Rp 90,000.00 Rp 115,000.00 Rp 100,000.00 Rp 90,000.00 Rp 190,000.00 Rp 185,000.00 Rp 270,000.00 Rp 455,000.00 Rp 2,565,800.00 Rp 810,000.00 Rp 3,375,800.00

Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp - Rp -

Rp 210,482.00 Rp 80,750.00 Rp 291,232.00 Rp 36,400.00 Rp 745.00 Rp 37,145.00 Rp 65,500.00 Rp 70,000.00 Rp 135,500.00 Rp 1,643,389.15 Rp 573,990.00 Rp 2,217,379.15 Rp 204,848.00 Rp 215,300.00 Rp 420,148.00 Rp 2,160,619.15 Rp 940,785.00 Rp 3,101,404.15 Rp 2,160,619.15 Rp 940,785.00 Rp 3,101,404.15

Rp - Rp - Rp - Rp - Rp - Rp -

Rp 884,722.64 Rp 132,708.40 Rp 1,017,431.04 Rp 138,005.00 Rp 269,867.50 Rp 407,872.50 Rp 1,022,727.64 Rp 402,575.90 Rp 1,425,303.54 Rp 1,022,727.64 Rp 402,575.90 Rp 1,425,303.54

Page 13: RAB Reza.xlsx

DAFTAR ANALISAA. Analisa Pekerjaan Tanah1 A.02.01 1 M3 GALIAN TANAH BIASA, SEDALAM 1 METER

0.400 org/hr0.040 org/hr

2 A.02.02 1 M3 GALIAN TANAH BIASA, SEDALAM 2 METER0.526 org/hr0.052 org/hr

3 A.02.09 1 M3 PEKERJAAN STRIPPING SEDALAM 1 METER0.050 org/hr0.005 org/hr

3 A.02.11 1 M3 URUGAN KEMBALI 0.192 org/hr0.019 org/hr

4 A.02.12 1 M3 PEMADATAN TANAH0.300 org/hr0.030 org/hr

5 A.02.13 1 M3 URUGAN PASIR1.200 m30.300 org/hr0.010 org/hr

6 A.02.18 1 M3 URUGAN SIRTU1.200 m30.250 org/hr0.025 org/hr

Page 14: RAB Reza.xlsx

7 A.02.11 1 M3 URUGAN TANAH KEMBALI1.200 m30.300 org/hr0.010 org/hr

B. Analisa Pekerjaan Pondasi1 A.03.04 1 M3 PONDASI BATU KALI 1 PC : 4 PS

1.100 m3163.000 kg

0.520 m30.600 org/hr0.060 org/hr1.500 org/hr0.035 org/hr

2 A.03.13 1 M3 PASANG AANSTAMPING BATU KOSONG1.200 m30.300 m30.390 org/hr0.039 org/hr0.780 org/hr0.020 org/hr

C. Analisa Pekerjaan Dinding1 A.04.05 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc : 5 Ps

140.000 bh22.200 kg0.102 m30.200 org/hr0.020 org/hr0.650 org/hr0.015 org/hr

2 A.04.09 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 2 Ps70.000 bh18.950 kg

Page 15: RAB Reza.xlsx

0.038 m30.100 org/hr0.010 org/hr0.320 org/hr0.005 org/hr

3 A.04.10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 3 Ps70.000 bh14.370 kg0.040 m30.100 org/hr0.010 org/hr0.320 org/hr0.005 org/hr

4 A.04.11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps70.000 bh11.500 kg0.043 m30.100 org/hr0.010 org/hr0.320 org/hr0.005 org/hr

5 A.04.12 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps70.000 bh9.680 kg0.045 m30.100 org/hr0.010 org/hr0.320 org/hr0.005 org/hr

6 A.04.25 1 M2 PASANGAN DINDING DINDING ROSTER/TERAWANG (12X11X24) KERAMI36.000 bh0.128 kg0.035 m30.100 org/hr0.010 org/hr0.300 org/hr0.015 org/hr

Page 16: RAB Reza.xlsx

7 A.05.36 1 M2 ACIAN PC 0.0800 zak 0.1430 org/hr 0.1070 org/hr 0.0105 org/hr 0.0053 org/hr

D. Analisa Pekerjaan Plesteran1 A.05.02 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 15 MM + ACIAN

8.520 kg0.017 m30.150 org/hr0.015 org/hr0.200 org/hr0.010 org/hr

2 A.05.03 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 15 MM + ACIAN6.480 kg0.019 m30.150 org/hr0.015 org/hr0.200 org/hr0.010 org/hr

3 A.05.04 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 15 MM + ACIAN5.200 kg0.020 m30.150 org/hr0.015 org/hr0.200 org/hr0.010 org/hr

4 A.05.05 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 15 MM + ACIAN4.320 kg0.022 m30.150 org/hr

Page 17: RAB Reza.xlsx

0.015 org/hr0.200 org/hr0.010 org/hr

E. Analisa Pekerjaan Kayu1 A.06.01 1 M2 PASANGAN KUSEN PINTU DAN JENDELA KAYU JATI

1.100 m315.000 org/hr3.000 org/hr6.000 org/hr0.500 org/hr

2 A.06.05 1 M2 PASANGAN PINTU PANEL KAYU JATI0.040 m32.500 org/hr0.250 org/hr1.000 org/hr0.050 org/hr

3 A.06.08 1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU JATI0.035 m32.000 org/hr0.200 org/hr0.800 org/hr0.040 org/hr

4 A.06.11 1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU JATI0.064 m33.000 org/hr0.300 org/hr1.000 org/hr0.150 org/hr

5 A.06.33 1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU JATI1.100 m35.800 kg5.000 org/hr

Page 18: RAB Reza.xlsx

2.000 org/hr3.000 org/hr0.400 org/hr

6 A.06.37 1 M2 PASANG KASO + RENG GENTENG PALENTONG KAYU KAMPER0.012 m30.150 kg0.150 org/hr0.015 org/hr0.150 org/hr0.008 org/hr

7 A.06.40 1 M3 PASANG KASO + RENG ATAP SIRAP KAYU KAMPER BANJAR0.017 m30.200 kg0.150 org/hr0.015 org/hr0.150 org/hr0.008 org/hr

8 A.06.43 1 M3 PASANG RANGKA LANGIT - LANGIT (1,00 x 1,00) m, KAYU KAMPER0.0120 m30.1000 kg0.2500 org/hr0.0250 org/hr0.1500 org/hr0.0750 org/hr

9 A.06.45 1 M2 PASANG LISPLANG UKURAN (3 x 20) cm, KAYU JATI0.0072 m30.0500 kg0.2000 org/hr0.0250 org/hr0.1000 org/hr0.0050 org/hr

10 A.06.48 1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU JATI

Page 19: RAB Reza.xlsx

0.0110 m30.0500 kg0.2200 org/hr0.0220 org/hr0.1100 org/hr0.0050 org/hr

11 A.06.52 1 M2 PASANG LISPLANG UKURAN 2 x (2 x 20) cm, KAYU KAMPER BANJAR0.0086 m30.0600 kg0.1000 org/hr0.0100 org/hr0.1000 org/hr0.0500 org/hr

12 A.06.54 1 M2 PASANG RANGKA DINDING PEMISAH KAYU KAMPER BANJAR0.0195 m30.0070 m30.1000 kg0.4500 org/hr0.0450 org/hr0.1500 org/hr0.0225 org/hr

13 A.06.57 1 M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER BANJAR0.0195 m30.0070 m30.1000 kg0.5600 bh0.7000 lbr0.6000 org/hr0.0600 org/hr0.2000 org/hr0.0100 org/hr

14 A.06.58 1 M2 PASANG POLYWOOD TEBAL 4 mm, UNTUK DINDING0.0500 kg0.7000 lbr0.0750 org/hr0.0075 org/hr0.0250 org/hr

Page 20: RAB Reza.xlsx

0.0013 org/hr

15 A.06.59 1 M1 PASANG LIST PLAFOND PROFIL KAYU KAMPER BANJAR 4/4 CM1.050 m'0.020 kg0.021 org/hr0.002 org/hr0.021 org/hr0.001 org/hr

16 A.06.61 1 M2 PASANGAN PINTU PANEL KAYU LOKAL KLS II LAPIS ALUMUNIUM0.040 m'1.000 kg2.500 org/hr0.250 org/hr1.000 org/hr0.050 org/hr

F. Analisa Pekerjaan Beton1 A.07.01 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr

218.0000 kg0.5200 m30.8700 m30.2500 org/hr0.0250 org/hr1.6500 org/hr0.0800 org/hr

2 A.07.05 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr232.0000 kg

0.5200 m30.7800 m30.2500 org/hr0.0250 org/hr1.6500 org/hr0.0800 org/hr

Page 21: RAB Reza.xlsx

3 A.07.25 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR1.0500 Kg0.0150 Kg0.0070 org/hr0.0007 org/hr0.0070 org/hr0.0003 org/hr

4 A.07.28 1 m2 PASANG BEKISTING UNTUK PONDASI0.0400 m30.3000 kg0.1000 ltr0.2600 org/hr0.0260 org/hr0.3000 org/hr0.0050 org/hr

5 A.07.29 1 m2 PASANG BEKISTING UNTUK SLOOF0.0044 m30.3000 kg0.1000 ltr0.2600 org/hr0.0260 org/hr0.3000 org/hr0.0050 org/hr

6 A.07.30 1 m2 PASANG BEKISTING UNTUK KOLOM0.0040 m30.4000 kg0.2000 ltr0.0015 m30.3300 org/hr0.0330 org/hr0.3000 org/hr0.0060 org/hr

7 A.07.31 1 m2 PASANG BEKISTING UNTUK BALOK0.0040 m30.4000 kg0.2000 ltr0.0018 m3

Page 22: RAB Reza.xlsx

2.0000 btg0.3300 org/hr0.0330 org/hr0.3200 org/hr0.0060 org/hr

8 A.07.32 1 m2 PASANG BEKISTING UNTUK LANTAI0.0020 m30.4000 kg0.2000 ltr0.0015 m30.3500 lbr4.0000 btg0.3300 org/hr0.0330 org/hr0.3200 org/hr0.0060 org/hr

9 A.07.33 1 m2 PASANG BEKISTING UNTUK DINDING0.0300 m30.4000 kg0.2000 ltr0.0200 m30.3500 lbr3.0000 btg4.0000 bh0.3300 org/hr0.0330 org/hr0.3200 org/hr0.0060 org/hr

10 A.07.34 1 m2 PASANG BEKISTING UNTUK TANGGA0.0030 m30.4000 kg0.1500 ltr0.0015 m30.3500 lbr2.0000 btg0.3300 org/hr0.0330 org/hr0.3200 org/hr0.0060 org/hr

Page 23: RAB Reza.xlsx

11 A.07.35 1 M3 MEMBUAT BETON DENGAN MUTU K 225388.0000 m3

0.6500 m30.6500 kg1.0000 org/hr0.1000 org/hr6.0000 org/hr0.3000 org/hr

12 A.07.36 1 M3 MEMBUAT BETON DENGAN MUTU K 275400.0000 m3

0.4000 m30.8200 kg1.0000 org/hr0.1000 org/hr6.0000 org/hr0.3000 org/hr

13 A.07.37 1 M2 PASANG TANGGA PENGECORAN0.0264 m30.6000 kg0.5000 btg0.0500 org/hr0.0050 org/hr0.1500 org/hr0.0070 org/hr

14 A.07.38 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 kg BESI + BEKISTNG) 0.2000 m³ 1.5000 kg 0.4000 lt 150.0000 kg 2.2500 kg 323.0000 kg 0.5200 m³ 0.7800 m³ 3.9000 org/hr 0.3500 org/hr 1.0400 org/hr 1.0500 org/hr 0.2450 org/hr 0.1650 org/hr

Page 24: RAB Reza.xlsx

15 A.07.38 1 M3 MEMBUAT SLOOF 10/15 (202 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM

0.4400 m³ 1.5000 kg 0.4000 lt 202.0000 kg 2.2500 kg 6.4600 zak 0.5200 m³ 0.7800 m³ 0.3500 org/hr 1.0400 org/hr 1.0500 org/hr 0.2450 org/hr 3.0000 org/hr 0.1225 org/hr

16 A.07.50 1 M3 MEMBUAT SLOOF 15/20 (180,8889 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM

0.2900 m³ 1.5000 kg 0.4000 lt 180.8889 kg 2.2500 kg 6.4600 zak 0.5200 m³ 0.7800 m³ 0.3500 org/hr 1.0400 org/hr 1.0500 org/hr 0.2450 org/hr 3.0000 org/hr 0.1225 org/hr

17 A.07.74 1 M2 PASANGAN LANTAI BATU SIKAT 1.0000 m² 0.2600 zak 0.0300 m³ 0.5000 org/hr 1.5000 org/hr 0.1000 org/hr 0.0250 org/hr

Page 25: RAB Reza.xlsx

18 A.07.75 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.10 JARAK 10 cm 232.0000 kg 0.5200 m³ 0.7800 m³ 137.3610 Kg 1.9623 Kg 0.2450 m³ 0.1500 kg 1.4000 Ltr 0.0700 m³ 6.4697 org/hr 0.2500 org/hr 4.0260 org/hr 1.0073 org/hr 0.5192 org/hr 0.1924 org/hr

G. Analisa Pekerjaan Atap1 A.08.02 1 M2 PASANG ATAP GENTENG PALENTONG

25.0000 lbr 0.1500 org/hr 0.0750 org/hr 0.0080 org/hr 0.0050 org/hr

2 A.08.05 1 M2 PASANG BUBUNG GENTENG PALENTONG 5.0000 lbr 8.0000 kg 0.0320 lbr 0.4000 org/hr 0.2000 org/hr 0.0200 org/hr 0.0020 org/hr

3 A.08.11 1 M2 PASANG ATAP ASBES GELOMBANG (1,80 x 0,90m) x 5 mm 0.6200 lbr 0.1200 kg 0.1400 org/hr 0.0700 org/hr 0.0070 org/hr 0.0035 org/hr

Page 26: RAB Reza.xlsx

4 A.08.14 1 M' PASANG NOK ASBES GELOMBANG , 4 mm 1.1000 lbr 0.0240 kg 0.0160 org/hr 0.0800 org/hr 0.0080 org/hr 0.0040 org/hr

5 A.08.30 1 M2 PASANG ATAP GENTENG BETON 11.0000 bh 0.0300 kg 0.2000 org/hr 0.1000 org/hr 0.0100 org/hr 0.0010 org/hr

H. Analisa Pekerjaan Langit - Langit1 A.09.02 1 M2 LANGIT - LANGIT ETERNIT (1,00 x 1,00) m , TEBAL 4 mm

1.1000 lbr 0.0100 kg 0.0300 org/hr 0.0700 org/hr 0.0070 org/hr 0.0015 org/hr

2 A.09.24 1 M2 LANGIT - LANGIT GYPSUM BOARD, TEBAL 9 mm 0.3640 lbr 0.1100 kg 0.1000 org/hr 0.0500 org/hr 0.0050 org/hr 0.0050 org/hr

I. Analisa Pekerjaan Kunci Dan Kaca1 A.12.02 1 BUAH PASANG KUNCI TANAM BIASA

1.000 bh

Page 27: RAB Reza.xlsx

0.0100 org/hr 0.5000 org/hr 0.0100 org/hr 0.0050 org/hr

2 A.12.03 1 BUAH PASANG KUNCI TANAM KAMAR MANDI1.00000 bh

0.0050 org/hr 0.5000 org/hr 0.0050 org/hr 0.0025 org/hr

3 A.12.05 1 BUAH PASANG ENGSEL PINTU1.00000 bh0.10000 org/hr0.01500 org/hr0.01500 org/hr0.00075 org/hr

4 A.12.06 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU1.00000 bh0.10000 org/hr0.01000 org/hr0.01000 org/hr0.00050 org/hr

5 A.12.09 1 BUAH PASANG KAIT ANGIN1.00000 bh0.15000 org/hr0.01500 org/hr0.01500 org/hr0.00075 org/hr

6 A.12.12 1 BUAH PASANG PEGANGAN PINTU / DOOR HOLDER1.00000 bh

0.0500 org/hr 0.5000 org/hr

Page 28: RAB Reza.xlsx

0.0500 org/hr 0.00250 org/hr

7 A.12.17 1 M2 PASANG KACA, TEBAL 5 MM1.10000 m20.15000 org/hr0.01500 org/hr0.01500 org/hr0.00075 org/hr

J. Analisa Pekerjaan Pintu Dan Jendela1 Spl. J.01 1 BH TYPE P1a (DAUN PINTU PANIL DAN VENTILASI JENDELA BINGKAI KACA)

0.0301392 0.030 m30.480 m20.000 m21.730 m21.000 bh3.000 bh1.000 bh0.000 m20.030 m30.480 m20.000 m21.730 m23.000 bh1.000 bh0.000 m2

2 Spl. J.02 1 BH TYPE P1b (DAUN PINTU PVC )0.0049392 0.005 m3

1.000 bh1.000 bh3.000 bh

#REF! m20.005 m31.000 bh3.000 bh

#REF! m2

K Analisa Pekerjaan Lantai

Page 29: RAB Reza.xlsx

1 A.13.44 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM 16.0000 bh 8.4000 kg 0.0420 m3 0.5000 kg 0.6200 org/hr 0.3500 org/hr 0.0350 org/hr

0.00300 org/hr

2 A.13.48 1 M2 PASANG LANTAI KERAMIK 33 X 33 CM ANTISLIP 10.0000 bh 8.4000 kg 0.0420 m3 0.5000 kg 0.6200 org/hr 0.3500 org/hr 0.0350 org/hr

0.00300 org/hr

3 A.13.68 1 M2 PASANG DINDING KERAMIK 20 X 20 CM, 25.0000 bh 8.4000 kg 0.0180 m3 0.5000 kg 0.6000 org/hr 0.1000 org/hr 0.0450 org/hr

0.00300 org/hr

4 A.13.82 1 M2 PASANG PLINT KAYU 2 X 10 CM 0.0024 Bh 0.0500 kg 0.1200 org/hr 0.1200 org/hr 0.0120 org/hr

0.0060 org/hr

5 A.13.86 1 M2 PASANGAN PAVING BLOCK NATURAL (6 CM) 1.0100 bh 0.1000 m3 0.2500 org/hr 0.5000 org/hr

Page 30: RAB Reza.xlsx

0.0250 org/hr 0.0030 org/hr

L. Analisa Pekerjaan Sanitasi1 A.10.01 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK

1.000 bh0.060 hrg

2.1000 org/hr 0.9600 org/hr 0.0010 org/hr 0.1600 org/hr

2 A.10.02 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN 1.0000 bh 6.0000 kg 0.0100 m³ 0.6000 org/hr 0.3000 org/hr 0.1500 org/hr 0.0800 org/hr

3 A.10.05 MEMASANG 1 BUAH WASTAFEL 1.0000 bh 0.1200 hrg 6.0000 kg 0.0100 m³ 1.2000 org/hr 1.4500 org/hr 0.1500 org/hr 0.1000 org/hr

4 A.10.07 MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M31.000 bh

0.1800 hrg 1.8000 org/hr 0.6000 org/hr 0.5400 org/hr 0.1100 org/hr

Page 31: RAB Reza.xlsx

5 A.10.20 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,75"1.200 m'

0.3500 hrg 0.0540 org/hr 0.0900 org/hr 0.0090 org/hr 0.0270 org/hr

6 A.10.23 MEMASANG 1 M' PIPA GALVANIS DIAMETER 3" 1.2000 m' 0.3500 hrg 0.1080 org/hr 0.1800 org/hr 0.0180 org/hr 0.0054 org/hr

7 A.10.36 MEMASANG 1 BH FLOOR DRAIN 1.0000 bh 0.0100 org/hr - org/hr 0.0010 org/hr 0.0005 org/hr

8 A.10.40 1 M1 SALURAN GREFEL BETON 1/2 Q 20 CM + PASANGAN 0.1500 m³ 1.0000 bh 1.0000 m1 0.1500 ls

9 A.10.39 1 UNIT SEPTICTANK 1.5 X 1 X 1,5 M + REMBESANNYA ( RUMAH KAPASITAS KECIL) 2.2500 m³ 0.1071 m³ 1.1250 m³ 7.5000 m² 0.1500 m³ 9.0000 m1 0.6000 btg 1.6875 m³ 2.7000 kg

Page 32: RAB Reza.xlsx

0.5250 m³ 9.0000 m1 0.5625 m³

10 A.10.16 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (30X30) TINGGI 35 CM 0.1450 bh 44.0000 kg 0.0700 m3 0.0700 m3 1.6000 kg 0.0600 m3 3.2000 org/hr 1.0150 org/hr 0.0015 org/hr 0.0160 org/hr

M. Analisa Pekerjaan Besi Dan Aluminium1 (Spl. M.02) MEMASANG 1 M' PIPA GIP Ø 2"

1.200 m'0.350 -0.180 org/hr0.018 org/hr0.108 org/hr0.054 org/hr

2 (Spl. M.03) 1 M2 MEMASANG RANGKA PLAFOND 60X80 cm0.0000 m'0.0000 m'0.0000 bh0.4583 btg1.0000 ls1.0000 ls

3 (Spl. M.04) 1 M2 MENGERJAKAN DAN MEMASANG ATAP RANGKA HOLLOW + ATAP POLYCARBONAT0.0000 m'#REF! bh0.4583 btg1.1000 m21.0000 ls1.0000 ls

N. Analisa Pekerjaan Pengecatan1 A.14.08 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR), 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP

0.2000 Kg 0.1500 Kg

Page 33: RAB Reza.xlsx

0.1700 Kg 0.2600 Kg 0.0700 org/hr 0.0090 org/hr 0.0060 org/hr

0.0025 org/hr

2 A.14.14 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) 0.1000 Kg 0.1000 Kg 0.2600 Kg 0.0200 org/hr 0.0630 org/hr 0.0063 org/hr

0.0025 org/hr

3 A.14.26 1 M2 PENGECATAN PLAFOND SEKELAS VINILEX (3x) 0.2000 Kg 0.1600 Kg 0.0100 Bh 0.5000 lbr 0.2000 org/hr 0.0280 org/hr 0.0150 org/hr 0.0090 org/hr

N. Analisa Pekerjaan Persiapan1 1 M' PENGUKURAN DAN PEMASANGAN BOUPLANK

0.012 m30.020 kg0.007 m30.100 org/hr0.100 org/hr0.010 org/hr0.005 org/hr

2 1 M2 PEMBUATAN KANTOR SEMENTARA DENGAN LANTAI PLESTERAN1.250 btg0.180 m30.400 kg0.700 zak0.150 m30.100 m30.150 m3

30.000 bh1.500 m21.000 bh0.080 m20.150 bh

Page 34: RAB Reza.xlsx

5.727 m22.000 org/hr1.000 org/hr0.300 org/hr2.000 org/hr0.050 org/hr

78 1 M2 PEMBUATAN GUDANG SEMEN DAN BARAK KERJA1.700 btg0.210 m30.300 kg0.210 zak0.030 m30.050 m31.500 lbr2.000 org/hr0.300 org/hr2.000 org/hr0.050 org/hr

Page 35: RAB Reza.xlsx

DAFTAR ANALISAAnalisa Pekerjaan Tanah

1 M3 GALIAN TANAH BIASA, SEDALAM 1 METER An.SNIPekerja @ Rp 60,000.00 Rp 24,000.00 Mandor @ Rp 100,000.00 Rp 4,000.00

Jumlah Harga Satuan Bahan Rp - Jumlah Harga Satuan Upah Rp 28,000.00 Jumlah Bahan + Upah Rp 28,000.00 Overhead + Profit (Contoh 15%) Rp 4,200.00 Jumlah Total Rp 32,200.00

1 M3 GALIAN TANAH BIASA, SEDALAM 2 METER An.SNIPekerja @ Rp 60,000.00 Rp 31,560.00 Mandor @ Rp 100,000.00 Rp 5,200.00

Jumlah Harga Satuan Bahan Rp - Jumlah Harga Satuan Upah Rp 36,760.00 Jumlah Bahan + Upah Rp 36,760.00 Overhead + Profit (Contoh 15%) Rp 5,514.00 Jumlah Total Rp 42,274.00

1 M3 PEKERJAAN STRIPPING SEDALAM 1 METER An.SNIPekerja @ Rp 60,000.00 Rp 3,000.00 Mandor @ Rp 100,000.00 Rp 500.00

Jumlah Harga Satuan Bahan Rp - Jumlah Harga Satuan Upah Rp 3,500.00 Jumlah Bahan + Upah Rp 3,500.00 Overhead + Profit (Contoh 15%) Rp 525.00 Jumlah Total Rp 4,025.00

1 M3 URUGAN KEMBALI An.SNIPekerja @ Rp 60,000.00 Rp 11,520.00 Mandor @ Rp 100,000.00 Rp 1,900.00

Jumlah Harga Satuan Bahan Rp - Jumlah Harga Satuan Upah Rp 13,420.00 Jumlah Bahan + Upah Rp 13,420.00 Overhead + Profit (Contoh 15%) Rp 2,013.00 Jumlah Total Rp 15,433.00

1 M3 PEMADATAN TANAH An.SNIPekerja @ Rp 60,000.00 Rp 18,000.00 Mandor @ Rp 100,000.00 Rp 3,000.00

Jumlah Harga Satuan Bahan Rp - Jumlah Harga Satuan Upah Rp 21,000.00 Jumlah Bahan + Upah Rp 21,000.00 Overhead + Profit (Contoh 15%) Rp 3,150.00 Jumlah Total Rp 24,150.00

1 M3 URUGAN PASIR An.SNIPasir Urug @ Rp 100,000.00 Rp 120,000.00 Pekerja @ Rp 60,000.00 Rp 18,000.00 Mandor @ Rp 100,000.00 Rp 1,000.00

Jumlah Harga Satuan Bahan Rp 120,000.00 Jumlah Harga Satuan Upah Rp 19,000.00 Jumlah Bahan + Upah Rp 139,000.00 Overhead + Profit (Contoh 15%) Rp 20,850.00 Jumlah Total Rp 159,850.00

1 M3 URUGAN SIRTU An.SNISirtu @ Rp 148,900.00 Rp 178,680.00 Pekerja @ Rp 60,000.00 Rp 15,000.00 Mandor @ Rp 100,000.00 Rp 2,500.00

Page 36: RAB Reza.xlsx

Jumlah Harga Satuan Bahan Rp 178,680.00 Jumlah Harga Satuan Upah Rp 17,500.00 Jumlah Bahan + Upah Rp 196,180.00 Overhead + Profit (Contoh 15%) Rp 29,427.00 Jumlah Total Rp 225,607.00

1 M3 URUGAN TANAH KEMBALI An.SNITanah Urug @ Rp 11,800.00 Rp 14,160.00 Pekerja @ Rp 60,000.00 Rp 18,000.00 Mandor @ Rp 100,000.00 Rp 1,000.00

Jumlah Harga Satuan Bahan Rp 14,160.00 Jumlah Harga Satuan Upah Rp 19,000.00 Jumlah Bahan + Upah Rp 33,160.00 Overhead + Profit (Contoh 15%) Rp 4,974.00 Jumlah Total Rp 38,134.00

Analisa Pekerjaan Pondasi1 M3 PONDASI BATU KALI 1 PC : 4 PS An.SNI

Batu Belah 15/20 @ Rp 154,500.00 Rp 169,950.00 Semen Portland @ Rp 1,800.00 Rp 293,400.00 Pasir Pasangan @ Rp 118,200.00 Rp 61,464.00 Tukang Batu @ Rp 75,000.00 Rp 45,000.00 Kepala Tukang @ Rp 95,000.00 Rp 5,700.00 Pekerja @ Rp 60,000.00 Rp 90,000.00 Mandor @ Rp 100,000.00 Rp 3,500.00

Jumlah Harga Satuan Bahan Rp 524,814.00 Jumlah Harga Satuan Upah Rp 144,200.00 Jumlah Bahan + Upah Rp 669,014.00 Overhead + Profit (Contoh 15%) Rp 100,352.10 Jumlah Total Rp 769,366.10

1 M3 PASANG AANSTAMPING BATU KOSONG An.SNIBatu Belah 15/20 @ Rp 154,500.00 Rp 185,400.00 Pasir Urug @ Rp 100,000.00 Rp 30,000.00 Tukang Batu @ Rp 75,000.00 Rp 29,250.00 Kepala Tukang @ Rp 95,000.00 Rp 3,705.00 Pekerja @ Rp 60,000.00 Rp 46,800.00 Mandor @ Rp 100,000.00 Rp 2,000.00

Jumlah Harga Satuan Bahan Rp 215,400.00 Jumlah Harga Satuan Upah Rp 81,755.00 Jumlah Bahan + Upah Rp 297,155.00 Overhead + Profit (Contoh 15%) Rp 44,573.25 Jumlah Total Rp 341,728.25

Analisa Pekerjaan Dinding1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc : 5 Ps An.SNI

Bata Merah 5 x 11 x 22 cm @ Rp 400.00 Rp 56,000.00 Semen Portland @ Rp 1,800.00 Rp 39,960.00 Pasir Pasangan @ Rp 118,200.00 Rp 12,056.40 Tukang Batu @ Rp 75,000.00 Rp 15,000.00 Kepala Tukang @ Rp 95,000.00 Rp 1,900.00 Pekerja @ Rp 60,000.00 Rp 39,000.00 Mandor @ Rp 100,000.00 Rp 1,500.00

Jumlah Harga Satuan Bahan Rp 108,016.40 Jumlah Harga Satuan Upah Rp 57,400.00 Jumlah Bahan + Upah Rp 165,416.40 Overhead + Profit (Contoh 15%) Rp 24,812.46 Jumlah Total Rp 190,228.86

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 2 Ps An.SNIBata Merah 5 x 11 x 22 cm @ Rp 400.00 Rp 28,000.00 Semen Portland @ Rp 1,800.00 Rp 34,110.00

Page 37: RAB Reza.xlsx

Pasir Pasangan @ Rp 118,200.00 Rp 4,491.60 Tukang Batu @ Rp 75,000.00 Rp 7,500.00 Kepala Tukang @ Rp 95,000.00 Rp 950.00 Pekerja @ Rp 60,000.00 Rp 19,200.00 Mandor @ Rp 100,000.00 Rp 500.00

Jumlah Harga Satuan Bahan Rp 66,601.60 Jumlah Harga Satuan Upah Rp 28,150.00 Jumlah Bahan + Upah Rp 94,751.60 Overhead + Profit (Contoh 15%) Rp 14,212.74 Jumlah Total Rp 108,964.34

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 3 Ps An.SNIBata Merah 5 x 11 x 22 cm @ Rp 400.00 Rp 28,000.00 Semen Portland @ Rp 1,800.00 Rp 25,866.00 Pasir Pasangan @ Rp 118,200.00 Rp 4,728.00 Tukang Batu @ Rp 75,000.00 Rp 7,500.00 Kepala Tukang @ Rp 95,000.00 Rp 950.00 Pekerja @ Rp 60,000.00 Rp 19,200.00 Mandor @ Rp 100,000.00 Rp 500.00

Jumlah Harga Satuan Bahan Rp 58,594.00 Jumlah Harga Satuan Upah Rp 28,150.00 Jumlah Bahan + Upah Rp 86,744.00 Overhead + Profit (Contoh 15%) Rp 13,011.60 Jumlah Total Rp 99,755.60

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps An.SNIBata Merah 5 x 11 x 22 cm @ Rp 400.00 Rp 28,000.00 Semen Portland @ Rp 1,800.00 Rp 20,700.00 Pasir Pasang @ Rp 118,200.00 Rp 5,082.60 Tukang Batu @ Rp 75,000.00 Rp 7,500.00 Kepala Tukang @ Rp 95,000.00 Rp 950.00 Pekerja @ Rp 60,000.00 Rp 19,200.00 Mandor @ Rp 100,000.00 Rp 500.00

Jumlah Harga Satuan Bahan Rp 53,782.60 Jumlah Harga Satuan Upah Rp 28,150.00 Jumlah Bahan + Upah Rp 81,932.60 Overhead + Profit (Contoh 15%) Rp 12,289.89 Jumlah Total Rp 94,222.49

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps An.SNIBata Merah 5 x 11 x 22 cm @ Rp 400.00 Rp 28,000.00 Semen Portland @ Rp 1,800.00 Rp 17,424.00 Pasir Pasangan @ Rp 118,200.00 Rp 5,319.00 Tukang Batu @ Rp 75,000.00 Rp 7,500.00 Kepala Tukang @ Rp 95,000.00 Rp 950.00 Pekerja @ Rp 60,000.00 Rp 19,200.00 Mandor @ Rp 100,000.00 Rp 500.00

Jumlah Harga Satuan Bahan Rp 50,743.00 Jumlah Harga Satuan Upah Rp 28,150.00 Jumlah Bahan + Upah Rp 78,893.00 Overhead + Profit (Contoh 15%) Rp 11,833.95 Jumlah Total Rp 90,726.95

1 M2 PASANGAN DINDING DINDING ROSTER/TERAWANG (12X11X24) KERAMI An.SNIRoster/Terawang @ Rp 40,000.00 Rp 1,440,000.00 Semen Portland @ Rp 1,800.00 Rp 230.40 Pasir Pasang @ Rp 118,200.00 Rp 4,137.00 Tukang Batu @ Rp 75,000.00 Rp 7,500.00 Kepala Tukang @ Rp 95,000.00 Rp 950.00 Pekerja @ Rp 60,000.00 Rp 18,000.00 Mandor @ Rp 100,000.00 Rp 1,500.00

Page 38: RAB Reza.xlsx

Jumlah Harga Satuan Bahan Rp 1,444,367.40 Jumlah Harga Satuan Upah Rp 27,950.00 Jumlah Bahan + Upah Rp 1,472,317.40 Overhead + Profit (Contoh 15%) Rp 220,847.61 Jumlah Total Rp 1,693,165.01

1 M2 ACIAN PC An.SNIP.C (50 kg) @ Rp 90,900.00 Rp 7,272.00 Pekerja setengah trampil @ Rp 65,000.00 Rp 9,295.00 Tk. batu setengah trampil @ Rp 75,000.00 Rp 8,025.00 Kep. Tukang batu @ Rp 95,000.00 Rp 997.50 Mandor @ Rp 100,000.00 Rp 525.00

Jumlah Harga Satuan Bahan Rp 7,272.00 Jumlah Harga Satuan Upah Rp 18,842.50 Jumlah Bahan + Upah Rp 26,114.50 Overhead + Profit (Contoh 15%) Rp 3,917.17 Jumlah Total Rp 30,031.68

Analisa Pekerjaan Plesteran1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 15 MM + ACIAN An.SNI

Semen Portland @ Rp 1,800.00 Rp 15,336.00 Pasir Pasang @ Rp 118,200.00 Rp 2,009.40 Tukang Batu @ Rp 75,000.00 Rp 11,250.00 Kepala Tukang @ Rp 95,000.00 Rp 1,425.00 Pekerja @ Rp 60,000.00 Rp 12,000.00 Mandor @ Rp 100,000.00 Rp 1,000.00

Jumlah Harga Satuan Bahan Rp 17,345.40 Jumlah Harga Satuan Upah Rp 25,675.00 Jumlah Bahan + Upah Rp 43,020.40 Overhead + Profit (Contoh 15%) Rp 6,453.06 Jumlah Total Rp 49,473.46

1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 15 MM + ACIAN An.SNISemen Portland @ Rp 1,800.00 Rp 11,664.00 Pasir Pasang @ Rp 118,200.00 Rp 2,245.80 Tukang Batu @ Rp 75,000.00 Rp 11,250.00 Kepala Tukang @ Rp 95,000.00 Rp 1,425.00 Pekerja @ Rp 60,000.00 Rp 12,000.00 Mandor @ Rp 100,000.00 Rp 1,000.00

Jumlah Harga Satuan Bahan Rp 13,909.80 Jumlah Harga Satuan Upah Rp 25,675.00 Jumlah Bahan + Upah Rp 39,584.80 Overhead + Profit (Contoh 15%) Rp 5,937.72 Jumlah Total Rp 45,522.52

1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 15 MM + ACIAN An.SNISemen Portland @ Rp 1,800.00 Rp 9,360.00 Pasir Pasang @ Rp 118,200.00 Rp 2,364.00 Tukang Batu @ Rp 75,000.00 Rp 11,250.00 Kepala Tukang @ Rp 95,000.00 Rp 1,425.00 Pekerja @ Rp 60,000.00 Rp 12,000.00 Mandor @ Rp 100,000.00 Rp 1,000.00

Jumlah Harga Satuan Bahan Rp 11,724.00 Jumlah Harga Satuan Upah Rp 25,675.00 Jumlah Bahan + Upah Rp 37,399.00 Overhead + Profit (Contoh 15%) Rp 5,609.85 Jumlah Total Rp 43,008.85

1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 15 MM + ACIAN An.SNISemen Portland @ Rp 1,800.00 Rp 7,776.00 Pasir Pasang @ Rp 118,200.00 Rp 2,600.40 Tukang Batu @ Rp 75,000.00 Rp 11,250.00

Page 39: RAB Reza.xlsx

Kepala Tukang @ Rp 95,000.00 Rp 1,425.00 Pekerja @ Rp 60,000.00 Rp 12,000.00 Mandor @ Rp 100,000.00 Rp 1,000.00

Jumlah Harga Satuan Bahan Rp 10,376.40 Jumlah Harga Satuan Upah Rp 25,675.00 Jumlah Bahan + Upah Rp 36,051.40 Overhead + Profit (Contoh 15%) Rp 5,407.71 Jumlah Total Rp 41,459.11

Analisa Pekerjaan Kayu1 M2 PASANGAN KUSEN PINTU DAN JENDELA KAYU JATI An. SNI

Kayu Jati, Balok @ Rp 12,409,100.00 Rp 13,650,010.00 Tukang Kayu @ Rp 75,000.00 Rp 1,125,000.00 Kepala Tukang Kayu @ Rp 95,000.00 Rp 285,000.00 Pekerja @ Rp 60,000.00 Rp 360,000.00 Mandor @ Rp 100,000.00 Rp 50,000.00

Jumlah Harga Satuan Bahan Rp 13,650,010.00 Jumlah Harga Satuan Upah Rp 1,820,000.00 Jumlah Bahan + Upah Rp 15,470,010.00 Overhead + Profit (Contoh 15%) Rp 2,320,501.50 Jumlah Total Rp 17,790,511.50

1 M2 PASANGAN PINTU PANEL KAYU JATI An. SNIKayu Jati, Papan @ Rp 14,227,300.00 Rp 569,092.00 Tukang Kayu @ Rp 75,000.00 Rp 187,500.00 Kepala Tukang Kayu @ Rp 95,000.00 Rp 23,750.00 Pekerja @ Rp 60,000.00 Rp 60,000.00 Mandor @ Rp 100,000.00 Rp 5,000.00

Jumlah Harga Satuan Bahan Rp 569,092.00 Jumlah Harga Satuan Upah Rp 276,250.00 Jumlah Bahan + Upah Rp 845,342.00 Overhead + Profit (Contoh 15%) Rp 126,801.30 Jumlah Total Rp 972,143.30

1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU JATI An. SNIKayu Jati , Papan @ Rp 14,227,300.00 Rp 497,955.50 Tukang Kayu @ Rp 75,000.00 Rp 150,000.00 Kepala Tukang Kayu @ Rp 95,000.00 Rp 19,000.00 Pekerja @ Rp 60,000.00 Rp 48,000.00 Mandor @ Rp 100,000.00 Rp 4,000.00

Jumlah Harga Satuan Bahan Rp 497,955.50 Jumlah Harga Satuan Upah Rp 221,000.00 Jumlah Bahan + Upah Rp 718,955.50 Overhead + Profit (Contoh 15%) Rp 107,843.33 Jumlah Total Rp 826,798.83

1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU JATI An. SNIKayu Jati , Papan @ Rp 14,227,300.00 Rp 910,547.20 Tukang Kayu @ Rp 75,000.00 Rp 225,000.00 Kepala Tukang Kayu @ Rp 95,000.00 Rp 28,500.00 Pekerja @ Rp 60,000.00 Rp 60,000.00 Mandor @ Rp 100,000.00 Rp 15,000.00

Jumlah Harga Satuan Bahan Rp 910,547.20 Jumlah Harga Satuan Upah Rp 328,500.00 Jumlah Bahan + Upah Rp 1,239,047.20 Overhead + Profit (Contoh 15%) Rp 185,857.08 Jumlah Total Rp 1,424,904.28

1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU JATI An. SNIKayu Jati, Balok @ Rp 12,409,100.00 Rp 13,650,010.00 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 95,120.00 Tukang Kayu @ Rp 75,000.00 Rp 375,000.00

Page 40: RAB Reza.xlsx

Kepala Tukang Kayu @ Rp 95,000.00 Rp 190,000.00 Pekerja @ Rp 60,000.00 Rp 180,000.00 Mandor @ Rp 100,000.00 Rp 40,000.00

Jumlah Harga Satuan Bahan Rp 13,745,130.00 Jumlah Harga Satuan Upah Rp 785,000.00 Jumlah Bahan + Upah Rp 14,530,130.00 Overhead + Profit (Contoh 15%) Rp 2,179,519.50 Jumlah Total Rp 16,709,649.50

1 M2 PASANG KASO + RENG GENTENG PALENTONG KAYU KAMPER An. SNIKayu Kamper, Balok @ Rp 8,909,100.00 Rp 106,909.20 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 2,460.00 Tukang Kayu @ Rp 75,000.00 Rp 11,250.00 Kepala Tukang Kayu @ Rp 95,000.00 Rp 1,425.00 Pekerja @ Rp 60,000.00 Rp 9,000.00 Mandor @ Rp 100,000.00 Rp 750.00

Jumlah Harga Satuan Bahan Rp 109,369.20 Jumlah Harga Satuan Upah Rp 22,425.00 Jumlah Bahan + Upah Rp 131,794.20 Overhead + Profit (Contoh 15%) Rp 19,769.13 Jumlah Total Rp 151,563.33

1 M3 PASANG KASO + RENG ATAP SIRAP KAYU KAMPER BANJAR An. SNIKayu Kamper, Balok @ Rp 8,909,100.00 Rp 147,000.15 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 3,280.00 Tukang Kayu @ Rp 75,000.00 Rp 11,250.00 Kepala Tukang Kayu @ Rp 95,000.00 Rp 1,425.00 Pekerja @ Rp 60,000.00 Rp 9,000.00 Mandor @ Rp 100,000.00 Rp 750.00

Jumlah Harga Satuan Bahan Rp 150,280.15 Jumlah Harga Satuan Upah Rp 22,425.00 Jumlah Bahan + Upah Rp 172,705.15 Overhead + Profit (Contoh 15%) Rp 25,905.77 Jumlah Total Rp 198,610.92

1 M3 PASANG RANGKA LANGIT - LANGIT (1,00 x 1,00) m, KAYU KAMPER An. SNIKayu Kamper, Balok @ Rp 8,909,100.00 Rp 106,909.20 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 1,640.00 Tukang Kayu @ Rp 75,000.00 Rp 18,750.00 Kepala Tukang @ Rp 95,000.00 Rp 2,375.00 Pekerja @ Rp 60,000.00 Rp 9,000.00 Mandor @ Rp 100,000.00 Rp 7,500.00

Jumlah Harga Satuan Bahan Rp 108,549.20 Jumlah Harga Satuan Upah Rp 37,625.00 Jumlah Bahan + Upah Rp 146,174.20 Overhead + Profit (Contoh 15%) Rp 21,926.13 Jumlah Total Rp 168,100.33

1 M2 PASANG LISPLANG UKURAN (3 x 20) cm, KAYU JATI An. SNIKayu Jati, Papan @ Rp 14,227,300.00 Rp 102,436.56 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 820.00 Tukang Kayu @ Rp 75,000.00 Rp 15,000.00 Kepala Tukang Kayu @ Rp 95,000.00 Rp 2,375.00 Pekerja @ Rp 60,000.00 Rp 6,000.00 Mandor @ Rp 100,000.00 Rp 500.00

Jumlah Harga Satuan Bahan Rp 103,256.56 Jumlah Harga Satuan Upah Rp 23,875.00 Jumlah Bahan + Upah Rp 127,131.56 Overhead + Profit (Contoh 15%) Rp 19,069.73 Jumlah Total Rp 146,201.29

1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU JATI An. SNI

Page 41: RAB Reza.xlsx

Kayu Jati, Papan @ Rp 14,227,300.00 Rp 156,500.30 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 820.00 Tukang Kayu @ Rp 75,000.00 Rp 16,500.00 Kepala Tukang Kayu @ Rp 95,000.00 Rp 2,090.00 Pekerja @ Rp 60,000.00 Rp 6,600.00 Mandor @ Rp 100,000.00 Rp 500.00

Jumlah Harga Satuan Bahan Rp 157,320.30 Jumlah Harga Satuan Upah Rp 25,690.00 Jumlah Bahan + Upah Rp 183,010.30 Overhead + Profit (Contoh 15%) Rp 27,451.55 Jumlah Total Rp 210,461.84

1 M2 PASANG LISPLANG UKURAN 2 x (2 x 20) cm, KAYU KAMPER BANJAR An. SNIKayu Kamper, Papan @ Rp 10,000,000.00 Rp 86,000.00 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 984.00 Tukang Kayu @ Rp 75,000.00 Rp 7,500.00 Kepala Tukang Kayu @ Rp 95,000.00 Rp 950.00 Pekerja @ Rp 60,000.00 Rp 6,000.00 Mandor @ Rp 100,000.00 Rp 5,000.00

Jumlah Harga Satuan Bahan Rp 86,984.00 Jumlah Harga Satuan Upah Rp 19,450.00 Jumlah Bahan + Upah Rp 106,434.00 Overhead + Profit (Contoh 15%) Rp 15,965.10 Jumlah Total Rp 122,399.10

1 M2 PASANG RANGKA DINDING PEMISAH KAYU KAMPER BANJAR An. SNI Kayu Kamper, Balok @ Rp 8,909,100.00 Rp 173,727.45 Kayu Kamper, Papan @ Rp 10,000,000.00 Rp 70,000.00 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 1,640.00 Tukang Kayu @ Rp 75,000.00 Rp 33,750.00 Kepala T u k a n g @ Rp 95,000.00 Rp 4,275.00 Pekerja @ Rp 60,000.00 Rp 9,000.00 Mandor @ Rp 100,000.00 Rp 2,250.00

Jumlah Harga Satuan Bahan Rp 245,367.45 Jumlah Harga Satuan Upah Rp 49,275.00 Jumlah Bahan + Upah Rp 294,642.45 Overhead + Profit (Contoh 15%) Rp 44,196.37 Jumlah Total Rp 338,838.82

1 M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER BANJARKayu Kamper, Balok @ Rp 8,909,100.00 Rp 173,727.45 Kayu Kamper, Papan @ Rp 10,000,000.00 Rp 70,000.00 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 1,640.00 Lem Kayu @ Rp 23,600.00 Rp 13,216.00 Plywood 4 mm 120 x 240 @ Rp 154,500.00 Rp 108,150.00 Tukang Kayu @ Rp 75,000.00 Rp 45,000.00 Kepala T u k a n g @ Rp 95,000.00 Rp 5,700.00 Pekerja @ Rp 60,000.00 Rp 12,000.00 Mandor @ Rp 100,000.00 Rp 1,000.00

Jumlah Harga Satuan Bahan Rp 366,733.45 Jumlah Harga Satuan Upah Rp 63,700.00 Jumlah Bahan + Upah Rp 430,433.45 Overhead + Profit (Contoh 15%) Rp 64,565.02 Jumlah Total Rp 494,998.47

1 M2 PASANG POLYWOOD TEBAL 4 mm, UNTUK DINDINGPaku Biasa 2" - 5" @ Rp 16,400.00 Rp 820.00 Plywood 4 mm 120 x 240 @ Rp 154,500.00 Rp 108,150.00 Tukang Kayu @ Rp 75,000.00 Rp 5,625.00 Kepala T u k a n g @ Rp 95,000.00 Rp 712.50 Pekerja @ Rp 60,000.00 Rp 1,500.00

Page 42: RAB Reza.xlsx

Mandor @ Rp 100,000.00 Rp 130.00 Jumlah Harga Satuan Bahan Rp 108,970.00 Jumlah Harga Satuan Upah Rp 7,967.50 Jumlah Bahan + Upah Rp 116,937.50 Overhead + Profit (Contoh 15%) Rp 17,540.63 Jumlah Total Rp 134,478.13

1 M1 PASANG LIST PLAFOND PROFIL KAYU KAMPER BANJAR 4/4 CM An. SNI Kayu List Profil @ Rp 7,300.00 Rp 7,665.00 Paku Biasa @ Rp 16,400.00 Rp 328.00 Tukang Kayu @ Rp 75,000.00 Rp 1,575.00 Kepala Tukang Kayu @ Rp 95,000.00 Rp 190.00 Pekerja @ Rp 60,000.00 Rp 1,260.00 Mandor @ Rp 100,000.00 Rp 100.00

Jumlah Harga Satuan Bahan Rp 7,993.00 Jumlah Harga Satuan Upah Rp 3,125.00 Jumlah Bahan + Upah Rp 11,118.00 Overhead + Profit (Contoh 15%) Rp 1,667.70 Jumlah Total Rp 12,785.70

1 M2 PASANGAN PINTU PANEL KAYU LOKAL KLS II LAPIS ALUMUNIUMKayu Lokal Kls II , Papan @ Rp 4,018,200.00 Rp 160,728.00 Aluminium @ Rp 146,700.00 Rp 146,700.00 Tukang Kayu @ Rp 75,000.00 Rp 187,500.00 Kepala T u k a n g @ Rp 95,000.00 Rp 23,750.00 Pekerja @ Rp 60,000.00 Rp 60,000.00 Mandor @ Rp 100,000.00 Rp 5,000.00

Jumlah Harga Satuan Bahan Rp 307,428.00 Jumlah Harga Satuan Upah Rp 276,250.00 Jumlah Bahan + Upah Rp 583,678.00 Overhead + Profit (Contoh 15%) Rp 87,551.70 Jumlah Total Rp 671,229.70

Analisa Pekerjaan Beton1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr An.SNI

Semen Portland @ Rp 1,800.00 Rp 392,400.00 Pasir Beton @ Rp 136,400.00 Rp 70,928.00 Batu Pecah Mesin 2/3 @ Rp 272,700.00 Rp 237,249.00 Tukang Batu @ Rp 75,000.00 Rp 18,750.00 Kepala Tukang @ Rp 95,000.00 Rp 2,375.00 Pekerja @ Rp 60,000.00 Rp 99,000.00 Mandor @ Rp 100,000.00 Rp 8,000.00

Jumlah Hrg. Satuan Bahan Rp 700,577.00 Jumlah Hrg. Satuan Upah Rp 128,125.00 Jumlah Bahan + Upah Rp 828,702.00 Overhead + Profit (Contoh 15%) Rp 124,305.30 Jumlah Total Rp 953,007.30

1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr An.SNISemen Portland @ Rp 1,800.00 Rp 417,600.00 Pasir Beton @ Rp 136,400.00 Rp 70,928.00 Batu Pecah Mesin 2/3 @ Rp 272,700.00 Rp 212,706.00 Tukang Batu @ Rp 75,000.00 Rp 18,750.00 Kepala Tukang @ Rp 95,000.00 Rp 2,375.00 Pekerja @ Rp 60,000.00 Rp 99,000.00 Mandor @ Rp 100,000.00 Rp 8,000.00

Jumlah Hrg. Satuan Bahan Rp 701,234.00 Jumlah Hrg. Satuan Upah Rp 128,125.00 Jumlah Bahan + Upah Rp 829,359.00 Overhead + Profit (Contoh 15%) Rp 124,403.85 Jumlah Total Rp 953,762.85

Page 43: RAB Reza.xlsx

1 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR An.SNIBesi Beton (Polos / ulir) @ Rp 14,500.00 Rp 15,225.00 Kawat Beton @ Rp 15,500.00 Rp 232.50 Tukang Besi @ Rp 75,000.00 Rp 525.00 Kepala Tukang @ Rp 95,000.00 Rp 66.50 Pekerja @ Rp 60,000.00 Rp 420.00 Mandor @ Rp 100,000.00 Rp 30.00

Jumlah Hrg. Satuan Bahan Rp 15,457.50 Jumlah Hrg. Satuan Upah Rp 1,041.50 Jumlah Bahan + Upah Rp 16,499.00 Overhead + Profit (Contoh 15%) Rp 2,474.85 Jumlah Total Rp 18,973.85

1 m2 PASANG BEKISTING UNTUK PONDASI An. SNIKayu Terentang Albasiah, Papan @ Rp 2,009,100.00 Rp 80,364.00 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 4,920.00 Minyak Bakesting @ Rp 36,600.00 Rp 3,660.00 Tukang Kayu @ Rp 75,000.00 Rp 19,500.00 Kepala Tukang @ Rp 95,000.00 Rp 2,470.00 Pekerja @ Rp 60,000.00 Rp 18,000.00 Mandor @ Rp 100,000.00 Rp 500.00

Jumlah Hrg. Satuan Bahan Rp 88,944.00 Jumlah Hrg. Satuan Upah Rp 40,470.00 Jumlah Bahan + Upah Rp 129,414.00 Overhead + Profit (Contoh 15%) Rp 19,412.10 Jumlah Total Rp 148,826.10

1 m2 PASANG BEKISTING UNTUK SLOOF An. SNIKayu Terentang Albasiah, Papan @ Rp 2,009,100.00 Rp 8,840.04 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 4,920.00 Minyak Bakesting @ Rp 36,600.00 Rp 3,660.00 Tukang Kayu @ Rp 75,000.00 Rp 19,500.00 Kepala Tukang @ Rp 95,000.00 Rp 2,470.00 Pekerja @ Rp 60,000.00 Rp 18,000.00 Mandor @ Rp 100,000.00 Rp 500.00

Jumlah Hrg. Satuan Bahan Rp 17,420.04 Jumlah Hrg. Satuan Upah Rp 40,470.00 Jumlah Bahan + Upah Rp 57,890.04 Overhead + Profit (Contoh 15%) Rp 8,683.51 Jumlah Total Rp 66,573.55

1 m2 PASANG BEKISTING UNTUK KOLOM An. SNIKayu Terentang Albasiah, Papan @ Rp 2,009,100.00 Rp 8,036.40 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 6,560.00 Minyak Bekisting @ Rp 36,600.00 Rp 7,320.00 Kayu Balok Albasiah @ Rp 2,000,000.00 Rp 3,000.00 Tukang Kayu @ Rp 75,000.00 Rp 24,750.00 Kepala Tukang @ Rp 95,000.00 Rp 3,135.00 Pekerja @ Rp 60,000.00 Rp 18,000.00 Mandor @ Rp 100,000.00 Rp 600.00

Jumlah Hrg. Satuan Bahan Rp 24,916.40 Jumlah Hrg. Satuan Upah Rp 46,485.00 Jumlah Bahan + Upah Rp 71,401.40 Overhead + Profit (Contoh 15%) Rp 10,710.21 Jumlah Total Rp 82,111.61

1 m2 PASANG BEKISTING UNTUK BALOK An. SNIKayu Terentang Albasiah, Papan @ Rp 2,009,100.00 Rp 8,036.40 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 6,560.00 Minyak Bekisting @ Rp 36,600.00 Rp 7,320.00 Kayu Balok Albasiah @ Rp 2,000,000.00 Rp 3,600.00

Page 44: RAB Reza.xlsx

@ Rp 106,400.00 Rp 212,800.00 Tukang Kayu @ Rp 75,000.00 Rp 24,750.00 Kepala Tukang @ Rp 95,000.00 Rp 3,135.00 Pekerja @ Rp 60,000.00 Rp 19,200.00 Mandor @ Rp 100,000.00 Rp 600.00

Jumlah Hrg. Satuan Bahan Rp 238,316.40 Jumlah Hrg. Satuan Upah Rp 47,685.00 Jumlah Bahan + Upah Rp 286,001.40 Overhead + Profit (Contoh 15%) Rp 42,900.21 Jumlah Total Rp 328,901.61

1 m2 PASANG BEKISTING UNTUK LANTAI An. SNIKayu Terentang Albasiah, Papan @ Rp 2,009,100.00 Rp 4,018.20 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 6,560.00 Minyak Bekisting @ Rp 36,600.00 Rp 7,320.00 Kayu Balok Albasiah @ Rp 2,000,000.00 Rp 3,000.00 Polywood tebal 9 mm @ Rp 213,900.00 Rp 74,865.00

@ Rp 106,400.00 Rp 425,600.00 Tukang Kayu @ Rp 75,000.00 Rp 24,750.00 Kepala Tukang @ Rp 95,000.00 Rp 3,135.00 Pekerja @ Rp 60,000.00 Rp 19,200.00 Mandor @ Rp 100,000.00 Rp 600.00

Jumlah Hrg. Satuan Bahan Rp 521,363.20 Jumlah Hrg. Satuan Upah Rp 47,685.00 Jumlah Bahan + Upah Rp 569,048.20 Overhead + Profit (Contoh 15%) Rp 85,357.23 Jumlah Total Rp 654,405.43

1 m2 PASANG BEKISTING UNTUK DINDING An. SNIKayu Terentang Albasiah, Papan @ Rp 2,009,100.00 Rp 60,273.00 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 6,560.00 Minyak Bekisting @ Rp 36,600.00 Rp 7,320.00 Balok Kayu KAYU LOKAL KLS II @ Rp 5,909,100.00 Rp 118,182.00 Polywood tebal 9 mm @ Rp 213,900.00 Rp 74,865.00

@ Rp 106,400.00 Rp 319,200.00 Formtie / Penjaga Jarak Berkisar / Spacer @ Rp - Tukang Kayu @ Rp 75,000.00 Rp 24,750.00 Kepala Tukang @ Rp 95,000.00 Rp 3,135.00 Pekerja @ Rp 60,000.00 Rp 19,200.00 Mandor @ Rp 100,000.00 Rp 600.00

Jumlah Hrg. Satuan Bahan Rp 586,400.00 Jumlah Hrg. Satuan Upah Rp 47,685.00 Jumlah Bahan + Upah Rp 634,085.00 Overhead + Profit (Contoh 15%) Rp 95,112.75 Jumlah Total Rp 729,197.75

1 m2 PASANG BEKISTING UNTUK TANGGA An. SNIKayu Terentang Albasiah, Papan @ Rp 2,009,100.00 Rp 6,027.30 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 6,560.00 Minyak Bekisting @ Rp 36,600.00 Rp 5,490.00 Kayu Balok Albasiah @ Rp 2,000,000.00 Rp 3,000.00 Polywood tebal 9 mm @ Rp 213,900.00 Rp 74,865.00

@ Rp 106,400.00 Rp 212,800.00 Tukang Kayu @ Rp 75,000.00 Rp 24,750.00 Kepala Tukang @ Rp 95,000.00 Rp 3,135.00 Pekerja @ Rp 60,000.00 Rp 19,200.00 Mandor @ Rp 100,000.00 Rp 600.00

Jumlah Hrg. Satuan Bahan Rp 308,742.30 Jumlah Hrg. Satuan Upah Rp 47,685.00 Jumlah Bahan + Upah Rp 356,427.30

Dolken Kayu Galam Ø - 8 - 10 / 4 m

Dolken Kayu Galam Ø - 8 - 10 / 4 m

Dolken Kayu Galam Ø - 8 - 10 / 4 m

Dolken Kayu Galam Ø - 8 - 10 / 4 m

Page 45: RAB Reza.xlsx

Overhead + Profit (Contoh 15%) Rp 53,464.09 Jumlah Total Rp 409,891.39

1 M3 MEMBUAT BETON DENGAN MUTU K 225 An. SNISemen Portland @ Rp 1,800.00 Rp 698,400.00 Pasir Beton @ Rp 136,400.00 Rp 88,660.00 Batu Pecah Mesin 2/3 @ Rp 272,700.00 Rp 177,255.00 Tukang Batu @ Rp 75,000.00 Rp 75,000.00 Kepala Tukang @ Rp 95,000.00 Rp 9,500.00 Pekerja @ Rp 60,000.00 Rp 360,000.00 Mandor @ Rp 100,000.00 Rp 30,000.00

Jumlah Hrg. Satuan Bahan Rp 964,315.00 Jumlah Hrg. Satuan Upah Rp 474,500.00 Jumlah Bahan + Upah Rp 1,438,815.00 Overhead + Profit (Contoh 15%) Rp 215,822.25 Jumlah Total Rp 1,654,637.25

1 M3 MEMBUAT BETON DENGAN MUTU K 275 An. SNISemen Portland @ Rp 1,800.00 Rp 720,000.00 Pasir Beton @ Rp 136,400.00 Rp 54,560.00 Batu Pecah Mesin 2/3 @ Rp 272,700.00 Rp 223,614.00 Tukang Batu @ Rp 75,000.00 Rp 75,000.00 Kepala Tukang @ Rp 95,000.00 Rp 9,500.00 Pekerja @ Rp 60,000.00 Rp 360,000.00 Mandor @ Rp 100,000.00 Rp 30,000.00

Jumlah Hrg. Satuan Bahan Rp 998,174.00 Jumlah Hrg. Satuan Upah Rp 474,500.00 Jumlah Bahan + Upah Rp 1,472,674.00 Overhead + Profit (Contoh 15%) Rp 220,901.10 Jumlah Total Rp 1,693,575.10

1 M2 PASANG TANGGA PENGECORAN An. SNIKayu Terentang Albasiah, Papan @ Rp 2,009,100.00 Rp 53,040.24 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 9,840.00

@ Rp 106,400.00 Rp 53,200.00 Tukang Batu @ Rp 75,000.00 Rp 3,750.00 Kepala Tukang @ Rp 95,000.00 Rp 475.00 Pekerja @ Rp 60,000.00 Rp 9,000.00 Mandor @ Rp 100,000.00 Rp 700.00

Jumlah Hrg. Satuan Bahan Rp 116,080.24 Jumlah Hrg. Satuan Upah Rp 13,925.00 Jumlah Bahan + Upah Rp 130,005.24 Overhead + Profit (Contoh 15%) Rp 19,500.79 Jumlah Total Rp 149,506.03

1 M3 MEMBUAT PONDASI BETON BERTULANG (150 kg BESI + BEKISTNG) An. SNIKayu Terentang Albasiah, Papan @ Rp 2,009,100.00 Rp 401,820.00 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 24,600.00 Minyak Bekisting @ Rp 36,600.00 Rp 14,640.00 Besi Beton Polos @ Rp 14,500.00 Rp 2,175,000.00 Kawat Beton @ Rp 15,500.00 Rp 34,875.00 Semen Portland @ Rp 1,800.00 Rp 581,400.00 Pasir Beton @ Rp 136,400.00 Rp 70,928.00 Batu Pecah Mesin 2/3 @ Rp 272,700.00 Rp 212,706.00 Pekerja @ Rp 60,000.00 Rp 234,000.00 Tukang Batu @ Rp 75,000.00 Rp 26,250.00 Tukang Kayu @ Rp 75,000.00 Rp 78,000.00 Tukang Besi @ Rp 75,000.00 Rp 78,750.00 Kepala Tukang @ Rp 95,000.00 Rp 23,275.00 Mandor @ Rp 100,000.00 Rp 16,500.00

Jumlah Hrg. Satuan Bahan Rp 3,515,969.00

Dolken Kayu Galam Ø - 8 - 10 / 4 m

Page 46: RAB Reza.xlsx

Jumlah Hrg. Satuan Upah Rp 456,775.00 Jumlah Bahan + Upah Rp 3,972,744.00 Overhead + Profit (Contoh 15%) Rp 595,911.60 Jumlah Total Rp 4,568,655.60

1 M3 MEMBUAT SLOOF 10/15 (202 Kg Besi + Bekesting) An. SNIDENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CMBekesting Albasiah @ Rp 2,009,100.00 Rp 884,004.00 Paku 5 - 7 cm @ Rp 16,400.00 Rp 24,600.00 Pelumas Bekesting @ Rp 36,600.00 Rp 14,640.00 Besi Beton Polos U 24 @ Rp 14,500.00 Rp 2,929,000.00 Kawat Beton @ Rp 15,500.00 Rp 34,875.00 Semen Portland @ Rp 90,900.00 Rp 587,214.00 Pasir Beton @ Rp 136,400.00 Rp 70,928.00 Batu Pecah 2/3 @ Rp 272,700.00 Rp 212,706.00 Tukang Batu @ Rp 90,000.00 Rp 31,500.00 Tukang Kayu @ Rp 90,000.00 Rp 93,600.00 Tukang Besi @ Rp 90,000.00 Rp 94,500.00 Kepala Tukang @ Rp 95,000.00 Rp 23,275.00 Pekerja @ Rp 60,000.00 Rp 180,000.00 Mandor @ Rp 100,000.00 Rp 12,250.00

Jumlah Hrg. Satuan Bahan Rp 4,757,967.00 Jumlah Hrg. Satuan Upah Rp 435,125.00 Jumlah Bahan + Upah Rp 5,193,092.00 Overhead + Profit (Contoh 15%) Rp 778,963.80 Jumlah Total Rp 5,972,055.80

1 M3 MEMBUAT SLOOF 15/20 (180,8889 Kg Besi + Bekesting) An. SNIDENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CMBekesting Albasiah @ Rp 2,009,100.00 Rp 582,639.00 Paku 5 - 7 cm @ Rp 16,400.00 Rp 24,600.00 Pelumas Bekesting @ Rp 36,600.00 Rp 14,640.00 Besi Beton Polos U 24 @ Rp 14,500.00 Rp 2,622,889.05 Kawat Beton @ Rp 15,500.00 Rp 34,875.00 Semen Portland @ Rp 90,900.00 Rp 587,214.00 Pasir Beton @ Rp 136,400.00 Rp 70,928.00 Batu Pecah 2/3 @ Rp 272,700.00 Rp 212,706.00 Tukang Batu @ Rp 90,000.00 Rp 31,500.00 Tukang Kayu @ Rp 90,000.00 Rp 93,600.00 Tukang Besi @ Rp 90,000.00 Rp 94,500.00 Kepala Tukang @ Rp 95,000.00 Rp 23,275.00 Pembantu Tukang @ Rp 60,000.00 Rp 180,000.00 Mandor @ Rp 100,000.00 Rp 12,250.00

Jumlah Hrg. Satuan Bahan Rp 4,150,491.05 Jumlah Hrg. Satuan Upah Rp 435,125.00 Jumlah Bahan + Upah Rp 4,585,616.05 Overhead + Profit (Contoh 15%) Rp 687,842.41 Jumlah Total Rp 5,273,458.46

1 M2 PASANGAN LANTAI BATU SIKAT An. SNIBatu sikat 0,5 / 2 cm @ Rp 72,700.00 Rp 72,700.00 P.C (50 kg) + Campuran khusus @ Rp 124,100.00 Rp 32,266.00 Pasir pasang @ Rp 118,200.00 Rp 3,546.00 Pekerja @ Rp 60,000.00 Rp 30,000.00 Tk. batu @ Rp 75,000.00 Rp 112,500.00 Kep. Tukang batu @ Rp 95,000.00 Rp 9,500.00 Mandor @ Rp 100,000.00 Rp 2,500.00

Jumlah Hrg. Satuan Bahan Rp 108,512.00 Jumlah Hrg. Satuan Upah Rp 154,500.00 Jumlah Bahan + Upah Rp 263,012.00

Page 47: RAB Reza.xlsx

Overhead + Profit (Contoh 15%) Rp 39,451.80 Jumlah Total Rp 302,463.80

1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.10 JARAK 10 cm An. SNISemen Portland @ Rp 1,800.00 Rp 417,600.00 Pasir Beton @ Rp 136,400.00 Rp 70,928.00 Batu Pecah Mesin 2/3 @ Rp 272,700.00 Rp 212,706.00 Besi Beton (Polos / ulir) @ Rp 14,500.00 Rp 1,991,734.50 Kawat Beton @ Rp 15,500.00 Rp 30,415.65 Kayu Terentang Albasiah, Papan @ Rp 2,009,100.00 Rp 492,229.50 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 2,460.00 Minyak Bekisting @ Rp 36,600.00 Rp 51,240.00 Kayu Balok Albasiah @ Rp 2,000,000.00 Rp 140,000.00 Pekerja @ Rp 60,000.00 Rp 388,184.40 Tukang Batu @ Rp 75,000.00 Rp 18,750.00 Tukang Kayu @ Rp 75,000.00 Rp 301,950.00 Tukang Besi @ Rp 75,000.00 Rp 75,548.55 Kepala Tukang @ Rp 95,000.00 Rp 49,321.53 Mandor @ Rp 100,000.00 Rp 19,244.60

Jumlah Hrg. Satuan Bahan Rp 3,409,313.65 Jumlah Hrg. Satuan Upah Rp 852,999.08 Jumlah Bahan + Upah Rp 4,262,312.73 Overhead + Profit (Contoh 15%) Rp 639,346.91 Jumlah Total Rp 4,901,659.64

Analisa Pekerjaan Atap1 M2 PASANG ATAP GENTENG PALENTONG An. SNI

Genteng Palentong @ Rp 2,200.00 Rp 55,000.00 Pekerja @ Rp 60,000.00 Rp 9,000.00 Tukang Kayu @ Rp 75,000.00 Rp 5,625.00 Kepala Tukang @ Rp 95,000.00 Rp 760.00 Mandor @ Rp 100,000.00 Rp 500.00

Jumlah Harga Satuan Bahan Rp 55,000.00 Jumlah Harga Satuan Upah Rp 15,885.00 Jumlah Bahan + Upah Rp 70,885.00 Overhead + Profit (Contoh 15%) Rp 10,632.75 Jumlah Total Rp 81,517.75

1 M2 PASANG BUBUNG GENTENG PALENTONG An. SNIGenteng Bubung Palentong @ Rp 2,900.00 Rp 14,500.00 Semen Portland @ Rp 1,800.00 Rp 14,400.00 Pasir Pasang @ Rp 118,200.00 Rp 3,782.40 Pekerja @ Rp 60,000.00 Rp 24,000.00 Tukang Kayu @ Rp 75,000.00 Rp 15,000.00 Kepala Tukang @ Rp 95,000.00 Rp 1,900.00 Mandor @ Rp 100,000.00 Rp 200.00

Jumlah Harga Satuan Bahan Rp 32,682.40 Jumlah Harga Satuan Upah Rp 41,100.00 Jumlah Bahan + Upah Rp 73,782.40 Overhead + Profit (Contoh 15%) Rp 11,067.36 Jumlah Total Rp 84,849.76

1 M2 PASANG ATAP ASBES GELOMBANG (1,80 x 0,90m) x 5 mm An. SNIAsbes Gelombang @ Rp 124,900.00 Rp 77,438.00 Paku Pancing 60 x 230 @ Rp 22,700.00 Rp 2,724.00 Pekerja @ Rp 60,000.00 Rp 8,400.00 Tukang Kayu @ Rp 75,000.00 Rp 5,250.00 Kepala Tukang @ Rp 95,000.00 Rp 665.00 Mandor @ Rp 100,000.00 Rp 350.00

Jumlah Harga Satuan Bahan Rp 80,162.00 Jumlah Harga Satuan Upah Rp 14,665.00

Page 48: RAB Reza.xlsx

Jumlah Bahan + Upah Rp 94,827.00 Overhead + Profit (Contoh 15%) Rp 14,224.05 Jumlah Total Rp 109,051.05

1 M' PASANG NOK ASBES GELOMBANG , 4 mm An. SNIAsbes Gelombang @ Rp 40,000.00 Rp 44,000.00 Paku Pancing 60 x 230 @ Rp 22,700.00 Rp 544.80 Pekerja @ Rp 60,000.00 Rp 960.00 Tukang Kayu @ Rp 75,000.00 Rp 6,000.00 Kepala Tukang @ Rp 95,000.00 Rp 760.00 Mandor @ Rp 100,000.00 Rp 400.00

Jumlah Harga Satuan Bahan Rp 44,544.80 Jumlah Harga Satuan Upah Rp 8,120.00 Jumlah Bahan + Upah Rp 52,664.80 Overhead + Profit (Contoh 15%) Rp 7,899.72 Jumlah Total Rp 60,564.52

1 M2 PASANG ATAP GENTENG BETON An. SNIGenteng Beton @ Rp 6,000.00 Rp 66,000.00 Paku Biasa 2" - 5" @ Rp 16,400.00 Rp 492.00 Pekerja @ Rp 60,000.00 Rp 12,000.00 Tukang Kayu @ Rp 75,000.00 Rp 7,500.00 Kepala Tukang @ Rp 95,000.00 Rp 950.00 Mandor @ Rp 100,000.00 Rp 100.00

Jumlah Harga Satuan Bahan Rp 66,492.00 Jumlah Harga Satuan Upah Rp 20,550.00 Jumlah Bahan + Upah Rp 87,042.00 Overhead + Profit (Contoh 15%) Rp 13,056.30 Jumlah Total Rp 100,098.30

Analisa Pekerjaan Langit - Langit1 M2 LANGIT - LANGIT ETERNIT (1,00 x 1,00) m , TEBAL 4 mm An.SNI

Eternit @ Rp 15,400.00 Rp 16,940.00 Paku @ Rp 16,400.00 Rp 164.00 Pekerja @ Rp 60,000.00 Rp 1,800.00 Tukang Kayu @ Rp 75,000.00 Rp 5,250.00 Kepala Tukang @ Rp 95,000.00 Rp 665.00 Mandor @ Rp 100,000.00 Rp 150.00

Jumlah Harga Satuan Bahan Rp 17,104.00 Jumlah Harga Satuan Upah Rp 7,865.00 Jumlah Bahan + Upah Rp 24,969.00 Overhead + Profit (Contoh 15%) Rp 3,745.35 Jumlah Total Rp 28,714.35

1 M2 LANGIT - LANGIT GYPSUM BOARD, TEBAL 9 mm An.SNIGypsum Board (120 x 240 x9) mm @ Rp 98,200.00 Rp 35,744.80 Paku Sekrup @ Rp 12,300.00 Rp 1,353.00 Pekerja @ Rp 60,000.00 Rp 6,000.00 Tukang Kayu @ Rp 75,000.00 Rp 3,750.00 Kepala Tukang @ Rp 95,000.00 Rp 475.00 Mandor @ Rp 100,000.00 Rp 500.00

Jumlah Harga Satuan Bahan Rp 37,097.80 Jumlah Harga Satuan Upah Rp 10,725.00 Jumlah Bahan + Upah Rp 47,822.80 Overhead + Profit (Contoh 15%) Rp 7,173.42 Jumlah Total Rp 54,996.22

Analisa Pekerjaan Kunci Dan Kaca1 BUAH PASANG KUNCI TANAM BIASA An.SNI

Kunci Tanam biasa @ Rp 87,350.00 Rp 87,350.00

Page 49: RAB Reza.xlsx

Pekerja @ Rp 60,000.00 Rp 600.00 Tukang Kayu @ Rp 75,000.00 Rp 37,500.00 Kepala Tukang @ Rp 95,000.00 Rp 950.00 Mandor @ Rp 100,000.00 Rp 500.00

Jumlah Harga Satuan Bahan Rp 87,350.00 Jumlah Harga Satuan Upah Rp 39,550.00 Jumlah Bahan + Upah Rp 126,900.00 Overhead + Profit (Contoh 15%) Rp 19,035.00 Jumlah Total Rp 145,935.00

1 BUAH PASANG KUNCI TANAM KAMAR MANDI An.SNIKunci Tanam Kamar Mandi @ Rp 40,950.00 Rp 40,950.00 Pekerja @ Rp 60,000.00 Rp 300.00 Tukang Kayu @ Rp 75,000.00 Rp 37,500.00 Kepala Tukang @ Rp 95,000.00 Rp 475.00 Mandor @ Rp 100,000.00 Rp 250.00

Jumlah Harga Satuan Bahan Rp 40,950.00 Jumlah Harga Satuan Upah Rp 38,525.00 Jumlah Bahan + Upah Rp 79,475.00 Overhead + Profit (Contoh 15%) Rp 11,921.25 Jumlah Total Rp 91,396.25

1 BUAH PASANG ENGSEL PINTU An.SNIEngsel Pintu @ Rp 12,200.00 Rp 12,200.00 Tukang Kayu @ Rp 75,000.00 Rp 7,500.00 Kepala Tukang @ Rp 95,000.00 Rp 1,425.00 Pekerja @ Rp 60,000.00 Rp 900.00 Mandor @ Rp 100,000.00 Rp 75.00

Jumlah Harga Satuan Bahan Rp 12,200.00 Jumlah Harga Satuan Upah Rp 9,900.00 Jumlah Bahan + Upah Rp 22,100.00 Overhead + Profit (Contoh 15%) Rp 3,315.00 Jumlah Total Rp 25,415.00

1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU An.SNIEngsel Jendela @ Rp 7,400.00 Rp 7,400.00 Tukang Kayu @ Rp 75,000.00 Rp 7,500.00 Kepala Tukang @ Rp 95,000.00 Rp 950.00 Pekerja @ Rp 60,000.00 Rp 600.00 Mandor @ Rp 100,000.00 Rp 50.00

Jumlah Harga Satuan Bahan Rp 7,400.00 Jumlah Harga Satuan Upah Rp 9,100.00 Jumlah Bahan + Upah Rp 16,500.00 Overhead + Profit (Contoh 15%) Rp 2,475.00 Jumlah Total Rp 18,975.00

1 BUAH PASANG KAIT ANGIN An.SNIKait Angin @ Rp 6,750.00 Rp 6,750.00 Tukang Kayu @ Rp 75,000.00 Rp 11,250.00 Kepala Tukang @ Rp 95,000.00 Rp 1,425.00 Pekerja @ Rp 60,000.00 Rp 900.00 Mandor @ Rp 100,000.00 Rp 75.00

Jumlah Harga Satuan Bahan Rp 6,750.00 Jumlah Harga Satuan Upah Rp 13,650.00 Jumlah Bahan + Upah Rp 20,400.00 Overhead + Profit (Contoh 15%) Rp 3,060.00 Jumlah Total Rp 23,460.00

1 BUAH PASANG PEGANGAN PINTU / DOOR HOLDER An.SNIDoor Holder @ Rp 23,000.00 Rp 23,000.00 Pekerja @ Rp 60,000.00 Rp 3,000.00 Tukang Kayu @ Rp 75,000.00 Rp 37,500.00

Page 50: RAB Reza.xlsx

Kepala Tukang @ Rp 95,000.00 Rp 4,750.00 Mandor @ Rp 100,000.00 Rp 250.00

Jumlah Harga Satuan Bahan Rp 23,000.00 Jumlah Harga Satuan Upah Rp 45,500.00 Jumlah Bahan + Upah Rp 68,500.00 Overhead + Profit (Contoh 15%) Rp 10,275.00 Jumlah Total Rp 78,775.00

1 M2 PASANG KACA, TEBAL 5 MM An. SNIKaca Polos 5 mm @ Rp 69,100.00 Rp 76,010.00 Tukang Kayu @ Rp 75,000.00 Rp 11,250.00 Kepala Tukang Kayu @ Rp 95,000.00 Rp 1,425.00 Pekerja @ Rp 60,000.00 Rp 900.00 Mandor @ Rp 100,000.00 Rp 75.00

Jumlah Harga Satuan Bahan Rp 76,010.00 Jumlah Harga Satuan Upah Rp 13,650.00 Jumlah Bahan + Upah Rp 89,660.00 Overhead + Profit (Contoh 15%) Rp 13,449.00 Jumlah Total Rp 103,109.00

Analisa Pekerjaan Pintu Dan Jendela1 BH TYPE P1a (DAUN PINTU PANIL DAN VENTILASI JENDELA BINGKAI KACA)

Kusen Kayu Kls. I @ Rp 1,820,000.00 Rp 54,853.34 Pasangan Bingkai Jendela Kaca @ Rp 221,000.00 Rp 718,955.50 Pasangan Kaca @ Rp 13,650.00 Rp 718,955.50 Daun Pintu Panil @ Rp 276,250.00 Rp 477,967.75 Kunci Pintu 2 X Slag @ Rp 250,000.00 Rp 250,000.00 Engsel Pintu @ Rp 25,000.00 Rp 75,000.00 Grendel Pintu @ Rp 25,000.00 Rp 25,000.00 Cat Kayu @ Rp 5,695.00 Rp - Upah Kusen @ Rp 15,470,010.00 Rp 466,253.73 Upah Pasangan Bingkai Jendela Kaca @ Rp 718,955.50 Rp 345,098.64 Upah Pasangan Kaca @ Rp 89,660.00 Rp 718,955.50 Upah Daun Pintu Panil @ Rp 845,342.00 Rp 1,462,610.73 Upah Pasang Engsel Pintu @ Rp 22,100.00 Rp 66,300.00 Upah Pasang Grendel Pintu @ Rp 68,500.00 Rp 68,500.00 Upah Cat @ Rp 52,228.00 Rp -

Jumlah Harga Satuan Bahan Rp 2,320,732.09 Jumlah Harga Satuan Upah Rp 3,127,718.59 Jumlah Bahan + UpahOverhead + Profit (Contoh 15%) Rp - Jumlah Total Rp -

1 BH TYPE P1b (DAUN PINTU PVC )Kusen Kayu Kls. I @ Rp 1,820,000.00 Rp 8,989.34 Daun Pintu PVC @ Rp 350,000.00 Rp 350,000.00 Kunci Pintu Slinder @ Rp 38,525.00 Rp 38,525.00 Engsel Pintu @ Rp 25,000.00 Rp 75,000.00 Cat Kayu @ Rp 5,695.00 #REF!Upah Kusen @ Rp 15,470,010.00 Rp 76,409.47 Upah Pasang Kunci Pintu Slinder @ Rp 79,475.00 Rp 79,475.00 Upah Pasang Engsel Pintu @ Rp 22,100.00 Rp 66,300.00 Upah Cat @ Rp 52,228.00 #REF!

Jumlah Harga Satuan Bahan #REF!Jumlah Harga Satuan Upah #REF!Jumlah Bahan + UpahOverhead + Profit (Contoh 15%) Rp - Jumlah Total Rp -

Analisa Pekerjaan Lantai

Page 51: RAB Reza.xlsx

1 M2 PASANG LANTAI KERAMIK 20 X 20 CM An.SNIUbin Keramik 20 x 20 cm @ Rp 3,272.00 Rp 52,352.00 Semen Portland @ Rp 1,800.00 Rp 15,120.00 Pasir Pasang @ Rp 118,200.00 Rp 4,964.40 Semen Warna @ Rp 9,100.00 Rp 4,550.00 Pekerja @ Rp 60,000.00 Rp 37,200.00 Tukang Batu @ Rp 75,000.00 Rp 26,250.00 Kepala Tukang @ Rp 95,000.00 Rp 3,325.00 Mandor @ Rp 100,000.00 Rp 300.00

Jumlah Harga Satuan Bahan Rp 76,986.40 Jumlah Harga Satuan Upah Rp 67,075.00 Jumlah Bahan + Upah Rp 144,061.40 Overhead + Profit (Contoh 15%) Rp 21,609.21 Jumlah Total Rp 165,670.61

1 M2 PASANG LANTAI KERAMIK 33 X 33 CM ANTISLIP An.SNIUbin Keramik 33 x 33 cm Antislip @ Rp 10,910.00 Rp 109,100.00 Semen Portland @ Rp 1,800.00 Rp 15,120.00 Pasir Pasang @ Rp 118,200.00 Rp 4,964.40 Semen Warna @ Rp 9,100.00 Rp 4,550.00 Pekerja @ Rp 60,000.00 Rp 37,200.00 Tukang Batu @ Rp 75,000.00 Rp 26,250.00 Kepala Tukang @ Rp 95,000.00 Rp 3,325.00 Mandor @ Rp 100,000.00 Rp 300.00

Jumlah Harga Satuan Bahan Rp 133,734.40 Jumlah Harga Satuan Upah Rp 67,075.00 Jumlah Bahan + Upah Rp 200,809.40 Overhead + Profit (Contoh 15%) Rp 30,121.41 Jumlah Total Rp 230,930.81

1 M2 PASANG DINDING KERAMIK 20 X 20 CM, An.SNIKeramik 20 x 20 cm @ Rp 3,272.00 Rp 81,800.00 Semen Abu-abu @ Rp 1,800.00 Rp 15,120.00 Pasir Pasang @ Rp 118,200.00 Rp 2,127.60 Semen Warna @ Rp 9,100.00 Rp 4,550.00 Pekerja @ Rp 45,000.00 Rp 27,000.00 Tukang Batu @ Rp 52,000.00 Rp 5,200.00 Kepala Tukang @ Rp 30,000.00 Rp 1,350.00 Mandor @ Rp 50,000.00 Rp 150.00

Jumlah Harga Satuan Bahan Rp 103,597.60 Jumlah Harga Satuan Upah Rp 33,700.00 Jumlah Bahan + Upah Rp 137,297.60 Overhead + Profit (Contoh 15%) Rp 20,594.64 Jumlah Total Rp 157,892.24

1 M2 PASANG PLINT KAYU 2 X 10 CM An.SNIKayu Jati Papan @ Rp 14,227,300.00 Rp 34,145.52 Paku Skrup 3-5 @ Rp 12,300.00 Rp 615.00 Pekerja @ Rp 60,000.00 Rp 7,200.00 Tukang Kayu @ Rp 75,000.00 Rp 9,000.00 Kepala Tukang @ Rp 95,000.00 Rp 1,140.00 Mandor @ Rp 100,000.00 Rp 600.00

Jumlah Harga Satuan Bahan Rp 34,760.52 Jumlah Harga Satuan Upah Rp 17,940.00 Jumlah Bahan + Upah Rp 52,700.52

1 M2 PASANGAN PAVING BLOCK NATURAL (6 CM)Paving Block Natural 6 cm @ Rp 47,300.00 Rp 47,773.00 Pasir Beton @ Rp 136,400.00 Rp 13,640.00 Pekerja @ Rp 60,000.00 Rp 15,000.00 Tukang Batu @ Rp 75,000.00 Rp 37,500.00

Page 52: RAB Reza.xlsx

Kepala Tukang Batu @ Rp 95,000.00 Rp 2,375.00 Mandor @ Rp 100,000.00 Rp 300.00

Jumlah Harga Satuan Bahan Rp 61,413.00 Jumlah Harga Satuan Upah Rp 55,175.00 Jumlah Bahan + Upah Rp 116,588.00 Overhead + Profit (Contoh 15%) Rp 17,488.20 Jumlah Total Rp 134,076.20

Analisa Pekerjaan SanitasiMEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK An.SNI

Kloset duduk/monoblok @ Rp 1,997,700.00 Rp 1,997,700.00 Perlengkapan @ Rp 1,997,700.00 Rp 119,862.00 Pekerja @ Rp 60,000.00 Rp 126,000.00 Tukang Batu @ Rp 75,000.00 Rp 72,000.00 Kepala Tukang @ Rp 95,000.00 Rp 95.00 Mandor @ Rp 100,000.00 Rp 16,000.00

Jumlah Harga Satuan Bahan Rp 2,117,562.00 Jumlah Harga Satuan Upah Rp 214,095.00 Jumlah Bahan + Upah Rp 2,331,657.00 Overhead + Profit (Contoh 15%) Rp 349,748.55 Jumlah Total Rp 2,681,405.55

MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN An.SNIKloset Jongkok porselen @ Rp 198,500.00 Rp 198,500.00 Semen Portland @ Rp 1,800.00 Rp 10,800.00 Pasir Pasang @ Rp 118,200.00 Rp 1,182.00 Pekerja @ Rp 60,000.00 Rp 36,000.00 Tukang Batu @ Rp 75,000.00 Rp 22,500.00 Kepala Tukang @ Rp 95,000.00 Rp 14,250.00 Mandor @ Rp 100,000.00 Rp 8,000.00

Jumlah Harga Satuan Bahan Rp 210,482.00 Jumlah Harga Satuan Upah Rp 80,750.00 Jumlah Bahan + Upah Rp 291,232.00 Overhead + Profit (Contoh 15%) Rp 43,684.80 Jumlah Total Rp 334,916.80

MEMASANG 1 BUAH WASTAFEL An.SNIWastafel @ Rp 930,500.00 Rp 930,500.00 Perlengkapan @ Rp 930,500.00 Rp 111,660.00 Semen Abu-abu @ Rp 1,800.00 Rp 10,800.00 Pasir Pasang @ Rp 118,200.00 Rp 1,182.00 Pekerja @ Rp 60,000.00 Rp 72,000.00 Tukang Batu @ Rp 75,000.00 Rp 108,750.00 Kepala Tukang @ Rp 95,000.00 Rp 14,250.00 Mandor @ Rp 100,000.00 Rp 10,000.00

Jumlah Harga Satuan Bahan Rp 1,054,142.00 Jumlah Harga Satuan Upah Rp 205,000.00 Jumlah Bahan + Upah Rp 1,259,142.00 Overhead + Profit (Contoh 15%) Rp 188,871.30 Jumlah Total Rp 1,448,013.30

MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3 An.SNIBak Fibreglass @ Rp 173,600.00 Rp 173,600.00 Perlengkapan @ Rp 173,600.00 Rp 31,248.00 Pekerja @ Rp 60,000.00 Rp 108,000.00 Tukang Batu @ Rp 75,000.00 Rp 45,000.00 Kepala Tukang @ Rp 95,000.00 Rp 51,300.00 Mandor @ Rp 100,000.00 Rp 11,000.00

Jumlah Harga Satuan Bahan Rp 204,848.00 Jumlah Harga Satuan Upah Rp 215,300.00 Jumlah Bahan + Upah Rp 420,148.00

Page 53: RAB Reza.xlsx

Overhead + Profit (Contoh 15%) Rp 63,022.20 Jumlah Total Rp 483,170.20

MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,75" An.SNIPipa Galvanis @ Rp 25,850.00 Rp 31,020.00 Perlengkapan @ Rp 25,850.00 Rp 9,047.50 Pekerja @ Rp 60,000.00 Rp 3,240.00 Tukang Batu @ Rp 75,000.00 Rp 6,750.00 Kepala Tukang @ Rp 95,000.00 Rp 855.00 Mandor @ Rp 100,000.00 Rp 2,700.00

Jumlah Harga Satuan Bahan Rp 40,067.50 Jumlah Harga Satuan Upah Rp 13,545.00 Jumlah Bahan + Upah Rp 53,612.50 Overhead + Profit (Contoh 15%) Rp 8,041.88 Jumlah Total Rp 61,654.38

MEMASANG 1 M' PIPA GALVANIS DIAMETER 3" An.SNIPipa Galvanis @ Rp 140,600.00 Rp 168,720.00 Perlengkapan @ Rp 140,600.00 Rp 49,210.00 Pekerja @ Rp 60,000.00 Rp 6,480.00 Tukang Batu @ Rp 75,000.00 Rp 13,500.00 Kepala Tukang @ Rp 95,000.00 Rp 1,710.00 Mandor @ Rp 100,000.00 Rp 540.00

Jumlah Harga Satuan Bahan Rp 217,930.00 Jumlah Harga Satuan Upah Rp 22,230.00 Jumlah Bahan + Upah Rp 240,160.00 Overhead + Profit (Contoh 15%) Rp 36,024.00 Jumlah Total Rp 276,184.00

MEMASANG 1 BH FLOOR DRAIN An.SNIFloordrain @ Rp 36,400.00 Rp 36,400.00 Pekerja @ Rp 60,000.00 Rp 600.00 Tukang Batu @ Rp 75,000.00 Rp - Kepala Tukang @ Rp 95,000.00 Rp 95.00 Mandor @ Rp 100,000.00 Rp 50.00

Jumlah Harga Satuan Bahan Rp 36,400.00 Jumlah Harga Satuan Upah Rp 745.00 Jumlah Bahan + Upah Rp 37,145.00 Overhead + Profit (Contoh 15%) Rp 5,571.75 Jumlah Total Rp 42,716.75

1 M1 SALURAN GREFEL BETON 1/2 Q 20 CM + PASANGAN An.SNIGalian Tanah @ Rp 28,000.00 Rp 4,200.00 Grefel Beton 20 Cm X 1/2 @ Rp 36,400.00 Rp 36,400.00 Pas . Bata + Plesteran 1 : 3 @ Rp 126,328.80 Rp 126,328.80 Upah kerja @ Rp 166,928.80 Rp 25,039.32

Jumlah Harga Satuan Bahan Rp 166,928.80 Jumlah Harga Satuan Upah Rp 25,039.32 Jumlah Bahan + Upah Rp 191,968.12 Overhead + Profit (Contoh 15%) Rp 28,795.22 Jumlah Total Rp 220,763.34

1 UNIT SEPTICTANK 1.5 X 1 X 1,5 M + REMBESANNYA ( RUMAH KAPASITAS KECIL)Galian tanah @ Rp 28,000.00 Rp 63,000.00 Urugan Pasir @ Rp 139,000.00 Rp 14,886.90 Lantai kerja @ Rp 828,702.00 Rp 932,289.75 Pas. bata 1 PC : 2 PS + Plesteran @ Rp - Plat beton penutup & balok @ Rp - Pipa PVC 4" jenis AW + sambungan @ Rp 62,050.00 Rp 558,450.00 Pipa GIP1/2" @ Rp 21,216.67 Rp 12,730.00 Galian tanah untuk rembesan @ Rp 36,760.00 Rp 62,032.50 Pas. injuk @ Rp -

Page 54: RAB Reza.xlsx

Urugan kerikil 3,5 cm @ Rp 263,600.00 Rp 138,390.00 Pipa PVC 4" berlobang jenis AW @ Rp 48,400.00 Rp 435,600.00 Urugan kembali perataan tanah @ Rp -

Jumlah Harga Satuan Bahan Rp 1,643,389.15 Jumlah Harga Satuan Upah Rp 573,990.00 Jumlah Bahan + Upah Rp 2,217,379.15 Overhead + Profit (Contoh 15%) Rp 332,606.87 Jumlah Total Rp 2,549,986.02

MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (30X30) TINGGI 35 CMBatu Bata @ Rp 400.00 Rp 58.00 Semen Portland @ Rp 1,800.00 Rp 79,200.00 Pasir Pasang @ Rp 118,200.00 Rp 8,274.00 Batu Kerikil @ Rp 272,700.00 Rp 19,089.00 Besi beton @ Rp 14,500.00 Rp 23,200.00 Pasir Beton @ Rp 136,400.00 Rp 8,184.00 Pekerja @ Rp 60,000.00 Rp 192,000.00 Tukang Batu @ Rp 75,000.00 Rp 76,125.00 Kepala Tukang @ Rp 95,000.00 Rp 142.50 Mandor @ Rp 100,000.00 Rp 1,600.00

Jumlah Harga Satuan Bahan Rp 138,005.00 Jumlah Harga Satuan Upah Rp 269,867.50 Jumlah Bahan + Upah Rp 407,872.50 Overhead + Profit (Contoh 15%) Rp 61,180.88 Jumlah Total Rp 469,053.38

Analisa Pekerjaan Besi Dan AluminiumMEMASANG 1 M' PIPA GIP Ø 2" An.SNI Pekerjaan Sanitasi An.6.23

@ Rp 79,166.67 Rp 95,000.00 Perlengkapan @ Rp 79,166.67 Rp 27,708.33 Tukang Besi @ Rp 45,000.00 Rp 8,100.00 Kapala Tukang @ Rp 52,000.00 Rp 936.00 Pekerja @ Rp 30,000.00 Rp 3,240.00 Mandor @ Rp 50,000.00 Rp 2,700.00

Jumlah Harga Satuan Bahan Rp 122,708.33 Jumlah Harga Satuan Upah Rp 14,976.00

1 M2 MEMASANG RANGKA PLAFOND 60X80 cmBesi Hollow 40X40X0,5 mm @ Rp 8,000.00 Rp - Besi Hollow 40X20X0,5 mm @ Rp 7,000.00 Rp - Skrup @ Rp 500.00 Rp - Besi Penggantung, L.40.40.4 @ Rp 57,000.00 Rp 26,125.00 Upah Potong @ Rp - Rp - Upah Las + Pasang @ Rp - Rp -

Jumlah Hrg. Satuan Bahan Rp 26,125.00 Jumlah Hrg. Satuan Upah Rp -

1 M2 MENGERJAKAN DAN MEMASANG ATAP RANGKA HOLLOW + ATAP POLYCARBONATBesi Hollow 40X40X0,5 mm @ Rp 8,000.00 Rp - Skrup @ Rp 500.00 #REF!Besi Penggantung, L.40.40.4 @ Rp 57,000.00 Rp 26,125.00 Atap Polycarbonat @ Rp 35,500.00 Rp 39,050.00 Upah Potong @ #REF! #REF!Upah Las + Pasang @ #REF! #REF!

Jumlah Hrg. Satuan Bahan #REF!Jumlah Hrg. Satuan Upah #REF!Jumlah Bahan + Upah

Analisa Pekerjaan Pengecatan1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR), 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP

Cat Meni @ Rp 69,100.00 Rp 13,820.00 Plamir @ Rp 20,000.00 Rp 3,000.00

Pipa Galvanise Ø 2" (Medium A)

Page 55: RAB Reza.xlsx

Cat dasar @ Rp 69,100.00 Rp 11,747.00 Cat Penutup @ Rp 69,100.00 Rp 17,966.00 Pekerja @ Rp 60,000.00 Rp 4,200.00 Tukang Cat @ Rp 75,000.00 Rp 675.00 Kepala Tukang @ Rp 95,000.00 Rp 570.00 Mandor @ Rp 100,000.00 Rp 250.00

Jumlah Harga Satuan Bahan Rp 46,533.00 Jumlah Harga Satuan Upah Rp 5,695.00 Jumlah Bahan + Upah Rp 52,228.00

1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)Plamir @ Rp 21,800.00 Rp 2,180.00 Cat Dasar @ Rp 14,500.00 Rp 1,450.00 Cat Penutup 2X @ Rp 14,500.00 Rp 3,770.00 Pekerja @ Rp 60,000.00 Rp 1,200.00 Tukang Cat @ Rp 75,000.00 Rp 4,725.00 Kepala Tukang @ Rp 95,000.00 Rp 598.50 Mandor @ Rp 100,000.00 Rp 250.00

Jumlah Harga Satuan Bahan Rp 7,400.00 Jumlah Harga Satuan Upah Rp 6,773.50 Jumlah Bahan + Upah Rp 14,173.50

1 M2 PENGECATAN PLAFOND SEKELAS VINILEX (3x)Cat tembok Vinilex / Sekelas Vinilex @ Rp 20,900.00 Rp 4,180.00 Plamir tembok @ Rp 21,800.00 Rp 3,488.00 Rol cat @ Rp 37,200.00 Rp 372.00 Ampelas @ Rp 3,600.00 Rp 1,800.00 Pekerja @ Rp 60,000.00 Rp 12,000.00 Tk. cat @ Rp 75,000.00 Rp 2,100.00 Kep. tukang cat @ Rp 95,000.00 Rp 1,425.00 Mandor @ Rp 100,000.00 Rp 900.00

Jumlah Harga Satuan Bahan Rp 9,840.00 Jumlah Harga Satuan Upah Rp 16,425.00 Jumlah Bahan + Upah Rp 26,265.00

Analisa Pekerjaan Persiapan1 M' PENGUKURAN DAN PEMASANGAN BOUPLANK

Kayu Biasa @ Rp 2,500,000.00 Rp 30,000.00 Paku Biasa 2" - 5" @ Rp 500.00 Rp 10.00 Kayu Papan @ Rp 1,800,000.00 Rp 12,600.00 Tukang kayu @ Rp 45,000.00 Rp 4,500.00 Kepala Tukang kayu @ Rp 52,000.00 Rp 5,200.00 Pekerja @ Rp 30,000.00 Rp 300.00 Mandor @ Rp 50,000.00 Rp 250.00

Jumlah Harga Satuan Bahan Rp 42,610.00 Jumlah Harga Satuan Upah Rp 10,250.00 Jumlah Bahan + Upah

1 M2 PEMBUATAN KANTOR SEMENTARA DENGAN LANTAI PLESTERANDolken Kayu Ø7-10/400 @ Rp 20,000.00 Rp 25,000.00 Balok Kayu Perancah @ Rp 1,800,000.00 Rp 324,000.00 Paku Biasa 2" - 5" @ Rp 12,500.00 Rp 5,000.00 Semen Portland @ Rp - Rp - Pasir Pasangan @ Rp 75,000.00 Rp 11,250.00 Pasir Beton @ Rp 95,000.00 Rp 9,500.00 Koral Beton @ Rp 165,000.00 Rp 24,750.00 Bata Merah @ Rp 300.00 Rp 9,000.00 Seng Plat 0,2 mm @ Rp 65,000.00 Rp 97,500.00 Jendela Nako @ Rp 32,500.00 Rp 32,500.00 Kaca Polos @ Rp 105,000.00 Rp 8,400.00 Kunci Tanam @ Rp 250,000.00 Rp 37,500.00

Page 56: RAB Reza.xlsx

Plywood @ Rp 64,000.00 Rp 366,540.80 Tukang kayu @ Rp 45,000.00 Rp 90,000.00 Tukang batu @ Rp 45,000.00 Rp 45,000.00 Kepala Tukang @ Rp 52,000.00 Rp 15,600.00 Pekerja @ Rp 30,000.00 Rp 60,000.00 Mandor @ Rp 50,000.00 Rp 2,500.00

Jumlah Harga Satuan Bahan Rp 950,940.80 Jumlah Harga Satuan Upah Rp 213,100.00 Jumlah Bahan + Upah

1 M2 PEMBUATAN GUDANG SEMEN DAN BARAK KERJADolken Kayu Ø7-10/400 @ 0.00 Rp - Balok Kayu Kls III @ 0.00 Rp - Paku Biasa 2" - 5" @ 0.00 Rp - Semen Portland @ 0.00 Rp - Pasir Beton @ 0.00 Rp - Koral Beton @ 0.00 Rp - Seng Gelombang 180X90BJLS30 @ 0.00 Rp - Tukang kayu @ 0.00 Rp - Kepala Tukang @ 0.00 Rp - Pekerja @ 0.00 Rp - Mandor @ 0.00 Rp -

Rp - Rp -

Page 57: RAB Reza.xlsx

DAFTAR ANALISA

An.SNI

An.SNI

An.SNI

An.SNI

An.SNI

An.SNI

An.SNI

Page 58: RAB Reza.xlsx

An.SNI

An.SNI

An.SNI

An.SNI

An.SNI

Page 59: RAB Reza.xlsx

An.SNI

An.SNI

An.SNI

An.SNI

Page 60: RAB Reza.xlsx

An.SNI

An.SNI

An.SNI

An.SNI

An.SNI

Page 61: RAB Reza.xlsx

An. SNI

An. SNI

An. SNI

An. SNI

An. SNI

Page 62: RAB Reza.xlsx

An. SNI

An. SNI

An. SNI

An. SNI

An. SNI

Page 63: RAB Reza.xlsx

An. SNI

An. SNI

An. SNI

An. SNI

Page 64: RAB Reza.xlsx

An. SNI

An.SNI

An.SNI

Page 65: RAB Reza.xlsx

An.SNI

An. SNI

An. SNI

An. SNI

An. SNI

Page 66: RAB Reza.xlsx

An. SNI

An. SNI

An. SNI

Page 67: RAB Reza.xlsx

An. SNI

An. SNI

An. SNI

An. SNI

Page 68: RAB Reza.xlsx

An. SNI

An. SNI

An. SNI

Page 69: RAB Reza.xlsx

An. SNI

An. SNI

An. SNI

An. SNI

Page 70: RAB Reza.xlsx

An. SNI

An. SNI

An.SNI

An.SNI

An.SNI

Page 71: RAB Reza.xlsx

An.SNI

An.SNI

An.SNI

An.SNI

An.SNI

Page 72: RAB Reza.xlsx

An. SNI

Page 73: RAB Reza.xlsx

An.SNI

An.SNI

An.SNI

An.SNI

An. SNI

Page 74: RAB Reza.xlsx

An.SNI

An.SNI

An.SNI

An.SNI

Page 75: RAB Reza.xlsx

An.SNI

An.SNI

An.SNI

An.SNI

An.SNI

Page 76: RAB Reza.xlsx

An. SNI

An.SNI Pekerjaan Sanitasi An.6.23

An.SNI

Page 77: RAB Reza.xlsx

An.SNI

An. SNI

Page 78: RAB Reza.xlsx
Page 79: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 79+29

ANALISA SATUAN PEKERJAANSTANDAR NASIONAL INDONESIA

TAHUN 2015

NO. URAIAN KOEF SAT. HARGA SAT. JUMLAH1 2 3 4 5 6 = ( 3 x 5 )

A.01.06 1 M1 PENGUKURAN DAN PASANGAN BOUWPLANKBAHAN :Kayu 5/7 Albasiah 0.0100 2,000,000.00 20,000.00 Paku Biasa 2"-5" 0.0200 Kg 16,400.00 328.00 Kayu Papan 3/20 Kayu Albasiah 0.0070 2,009,100.00 14,063.70 Jumlah Bahan 34,391.70 UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Tukang Kayu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 14,950.00 Jumlah Bahan + Pekerja 49,341.70

A.01.10 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAANBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 11,000.00 Jumlah Bahan + Pekerja 11,000.00

A.01.07 1 M2 PEMBUATAN DIREKSI KEET DAN LOS BAHANBAHAN :Kayu Albasiah 0.0800 m³ 2,000,000.00 160,000.00 Paku 4 - 7 0.2500 kg 16,400.00 4,100.00 Seng Glb BJLS 28 ( 80 x 180 cm ) 0.6200 lbr 23,900.00 14,818.00 Triplex 3 mm 0.5000 lbr 91,700.00 45,850.00 PC (50 kg) 0.1000 zak 90,900.00 9,090.00 Pasir pasang 0.2500 m³ 118,200.00 29,550.00 Bata merah 70.0000 bh 400.00 28,000.00 Jumlah Bahan 291,408.00 UPAH :Ongkos Pasang 0.1500 ls 291,408.00 43,711.20 Jumlah Pekerja 43,711.20 Jumlah Bahan + Pekerja 335,119.20

A.01.12 1 M3 BONGKARAN BETON BERTULANGBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 6.6670 Oh 60,000.00 400,020.00 Mandor 0.3330 Oh 100,000.00 33,300.00 Jumlah Pekerja 433,320.00 Jumlah Bahan + Pekerja 433,320.00

m3

m3

Page 80: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 80+29

1 2 3 4 5 6 = ( 3 x 5 )A.01.13 1 M2 BONGKARAN DINDING TEMBOK BATA MERAH

BAHAN : - -

Jumlah Bahan - UPAH :Pekerja 0.6667 Oh 60,000.00 40,002.00 Mandor 0.0330 Oh 100,000.00 3,300.00 Jumlah Pekerja 43,302.00 Jumlah Bahan + Pekerja 43,302.00

A.01.16 1 M2 PAPAN NAMA PROYEKBAHAN :Kayu Albasiah, Balok 0.0420 m³ 2,000,000.00 84,000.00 Paku 4 - 7 0.2500 kg 16,400.00 4,100.00 Pengecatan Kayu 1.0000 ls 11,747.00 11,747.00 Jumlah Bahan 99,847.00 UPAH :Penulisan 0.1250 Oh 99,847.00 12,480.88 Ongkos Pasang 0.1250 Oh 99,847.00 12,480.88 Jumlah Pekerja 24,961.75 Jumlah Bahan + Pekerja 124,808.75

A.02.01 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 1 MBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.4000 Oh 60,000.00 24,000.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 28,000.00 Jumlah Bahan + Pekerja 28,000.00

A.02.02 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 2 MBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.5260 Oh 60,000.00 31,560.00 Mandor 0.0520 Oh 100,000.00 5,200.00 Jumlah Pekerja 36,760.00 Jumlah Bahan + Pekerja 36,760.00

A.02.03 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 3 MBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.7350 Oh 60,000.00 44,100.00 Mandor 0.0730 Oh 100,000.00 7,300.00 Jumlah Pekerja 51,400.00 Jumlah Bahan + Pekerja 51,400.00

Page 81: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 81+29

1 2 3 4 5 6 = ( 3 x 5 )A.02.04 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 4 M

BAHAN : - -

Jumlah Bahan - UPAH :Pekerja 0.9440 Oh 60,000.00 56,640.00 Mandor 0.0940 Oh 100,000.00 9,400.00 Jumlah Pekerja 66,040.00 Jumlah Bahan + Pekerja 66,040.00

A.02.05 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 5 MBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 1.1530 Oh 60,000.00 69,180.00 Mandor 0.1150 Oh 100,000.00 11,500.00 Jumlah Pekerja 80,680.00 Jumlah Bahan + Pekerja 80,680.00

A.02.06 1 M3 GALIAN TANAH KERAS SEDALAM 1 METERBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.6250 Oh 60,000.00 37,500.00 Mandor 0.0620 Oh 100,000.00 6,200.00 Jumlah Pekerja 43,700.00 Jumlah Bahan + Pekerja 43,700.00

A.02.07 1 M3 GALIAN TANAH CADAS SEDALAM 1 METERBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 1.2500 Oh 60,000.00 75,000.00 Mandor 0.1250 Oh 100,000.00 12,500.00 Jumlah Pekerja 87,500.00 Jumlah Bahan + Pekerja 87,500.00

A.02.08 1 M3 GALIAN TANAH LUMPUR SEDALAM 1 METERBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.8230 Oh 60,000.00 49,380.00 Mandor 0.0830 Oh 100,000.00 8,300.00 Jumlah Pekerja 57,680.00 Jumlah Bahan + Pekerja 57,680.00

Page 82: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 82+29

1 2 3 4 5 6 = ( 3 x 5 )A.02.09 1 M2 PEKERJAAN STRIPING TANAH SETINGGI 1 METER

BAHAN : - -

Jumlah Bahan - UPAH :Pekerja 0.0500 Oh 60,000.00 3,000.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 3,500.00 Jumlah Bahan + Pekerja 3,500.00

A.02.10 1 M3 PEMBUANGAN TANAH SEJAUH 150 METERBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.5160 Oh 60,000.00 30,960.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 35,960.00 Jumlah Bahan + Pekerja 35,960.00

A.02.11 1 M3 URUGAN TANAH KEMBALIBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.1920 Oh 60,000.00 11,520.00 Mandor 0.0190 Oh 100,000.00 1,900.00 Jumlah Pekerja 13,420.00 Jumlah Bahan + Pekerja ``````````````````` 13,420.00

A.02.12 1 M3 PEMADATAN TANAHBAHAN :

- -

Jumlah Bahan - UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Mandor 0.0300 Oh 100,000.00 3,000.00 Jumlah Pekerja 21,000.00 Jumlah Bahan + Pekerja 21,000.00

A.02.13 1 M3 URUGAN PASIRBAHAN :Pasir Urug 1.2000 m³ 100,000.00 120,000.00

Jumlah Bahan 120,000.00 UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Mandor 0.0100 Oh 100,000.00 1,000.00 Jumlah Pekerja 19,000.00 Jumlah Bahan + Pekerja 139,000.00

Page 83: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 83+29

1 2 3 4 5 6 = ( 3 x 5 )A.02.14 1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 3 PS : 7 TL

BAHAN :Pasir Urug 0.3300 m³ 100,000.00 33,000.00 Kapur Padam 0.1090 m³ 161,300.00 17,581.70 Tanah Liat 0.7630 m³ 52,700.00 40,210.10 Jumlah Bahan 90,791.80 UPAH :Pekerja 0.8330 Oh 60,000.00 49,980.00 Tukang Batu 0.4160 Oh 75,000.00 31,200.00 Kepala Tukang 0.0400 Oh 95,000.00 3,800.00 Mandor 0.0830 Oh 100,000.00 8,300.00 Jumlah Pekerja 93,280.00 Jumlah Bahan + Pekerja 184,071.80

A.02.15 1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 5 TLBAHAN :Kapur Padam 0.2000 m³ 161,300.00 32,260.00 Tanah Liat 1.0000 m³ 52,700.00 52,700.00 Jumlah Bahan 84,960.00 UPAH :Pekerja 0.8330 Oh 60,000.00 49,980.00 Tukang Batu 0.4160 Oh 75,000.00 31,200.00 Kepala Tukang 0.0410 Oh 95,000.00 3,895.00 Mandor 0.0810 Oh 100,000.00 8,100.00 Jumlah Pekerja 93,175.00 Jumlah Bahan + Pekerja 178,135.00

A.02.16 1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 5 TSBAHAN :Kapur Padam 0.2000 m³ 161,300.00 32,260.00 Pasir Pasang 1.0000 m³ 118,200.00 118,200.00 Jumlah Bahan 150,460.00 UPAH :Pekerja 0.8330 Oh 60,000.00 49,980.00 Tukang Batu 0.4160 Oh 75,000.00 31,200.00 Kepala Tukang 0.0410 Oh 95,000.00 3,895.00 Mandor 0.0810 Oh 100,000.00 8,100.00 Jumlah Pekerja 93,175.00 Jumlah Bahan + Pekerja 243,635.00

A.02.17 1 M3 PEMASANGAN LAPISAN IJUKBAHAN :Injuk 1.2000 m³ 21,800.00 26,160.00

Jumlah Bahan 26,160.00 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Mandor 0.0150 Oh 100,000.00 1,500.00 Jumlah Pekerja 10,500.00 Jumlah Bahan + Pekerja 36,660.00

A.02.18 1 M3 URUGAN SIRTUBAHAN :Sirtu 1.2000 m³ 148,900.00 178,680.00

Jumlah Bahan 178,680.00 UPAH :Pekerja 0.2500 Oh 60,000.00 15,000.00 Mandor 0.0250 Oh 100,000.00 2,500.00 Jumlah Pekerja 17,500.00 Jumlah Bahan + Pekerja 196,180.00

Page 84: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 84+29

1 2 3 4 5 6 = ( 3 x 5 )A.02.19 1 M2 PEMBUATAN JALAN SEMENTARA, TEBAL 25 CM

BAHAN :Batu Belah 0.2750 m³ 154,500.00 42,487.50 Kerikil 0.0300 m³ 228,200.00 6,846.00 Pasir Urug 0.0500 m³ 100,000.00 5,000.00 Jumlah Bahan 54,333.50 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Mandor 0.1000 Oh 100,000.00 10,000.00 Jumlah Pekerja 70,000.00 Jumlah Bahan + Pekerja 124,333.50

A.02.20 1 M3 PEKERJAAN GALIAN TANAH SUMURAN MAX KEDALAMAN 10 M'BAHAN :

- Jumlah Bahan - UPAH :Pekerja 1.1500 Oh 60,000.00 69,000.00 Mandor 0.0250 Oh 100,000.00 2,500.00 Jumlah Pekerja 71,500.00 Jumlah Bahan + Pekerja 71,500.00

A.02.22 1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR)BAHAN :Tanah Urug (didatangkan) 1.2000 m³ 11,800.00 14,160.00

Jumlah Bahan 14,160.00 UPAH :Pekerja 0.4500 Oh 60,000.00 27,000.00 Mandor 0.0450 Oh 100,000.00 4,500.00 Alat Bantu (sewa Stamper) 0.1250 Oh 98,300.00 12,287.50 Jumlah Pekerja 43,787.50 Jumlah Bahan + Pekerja 57,947.50

A.02.23 1 M2 PASANGAN LEMPENGAN RUMPUT SAMPAI TUMBUH BAHAN :Lempengan Rumput Biasa (Teki) 1.2000 m² 12,500.00 15,000.00 Jumlah Bahan 15,000.00 UPAH :Pekerja Setengah Terampil 0.0400 org 65,000.00 2,600.00 Mandor 0.0100 org 100,000.00 1,000.00 Jumlah Pekerja 3,600.00 Jumlah Bahan + Pekerja 18,600.00

A.03.02 1 M3 PASANG PONDASI BATU KALI 1 Pc : 2 PsBAHAN :Batu Belah 15/20 1.1000 m³ 154,500.00 169,950.00 Semen Portland 267.0000 Kg 1,800.00 480,600.00 Pasir Pasang 0.4270 m³ 118,200.00 50,471.40 Jumlah Bahan 701,021.40 UPAH :Pekerja 1.5000 Oh 60,000.00 90,000.00 Tukang Batu 0.6000 Oh 75,000.00 45,000.00 Kepala Tukang 0.0600 Oh 95,000.00 5,700.00 Mandor 0.0350 Oh 100,000.00 3,500.00 Jumlah Pekerja 144,200.00 Jumlah Bahan + Pekerja 845,221.40

Page 85: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 85+29

1 2 3 4 5 6 = ( 3 x 5 )A.03.03 1 M3 PASANG PONDASI BATU KALI 1 Pc : 3 Ps

BAHAN :Batu Belah 15/20 1.1000 m³ 154,500.00 169,950.00 Semen Portland 202.0000 Kg 1,800.00 363,600.00 Pasir Pasang 0.4850 m³ 118,200.00 57,327.00 Jumlah Bahan 590,877.00 UPAH :Pekerja 1.5000 Oh 60,000.00 90,000.00 Tukang Batu 0.6000 Oh 75,000.00 45,000.00 Kepala Tukang 0.0600 Oh 95,000.00 5,700.00 Mandor 0.0350 Oh 100,000.00 3,500.00 Jumlah Pekerja 144,200.00 Jumlah Bahan + Pekerja 735,077.00

A.03.04 1 M3 PASANG PONDASI BATU KALI 1 Pc : 4 PsBAHAN :Batu Belah 15/20 1.1000 m³ 154,500.00 169,950.00 Semen Portland 163.0000 Kg 1,800.00 293,400.00 Pasir Pasang 0.5200 m³ 118,200.00 61,464.00 Jumlah Bahan 524,814.00 UPAH :Pekerja 1.5000 Oh 60,000.00 90,000.00 Tukang Batu 0.6000 Oh 75,000.00 45,000.00 Kepala Tukang 0.0600 Oh 95,000.00 5,700.00 Mandor 0.0350 Oh 100,000.00 3,500.00 Jumlah Pekerja 144,200.00 Jumlah Bahan + Pekerja 669,014.00

A.03.05 1 M3 PASANG PONDASI BATU KALI 1 Pc : 5 PsBAHAN :Batu Belah 15/20 1.1000 m³ 154,500.00 169,950.00 Semen Portland 136.0000 Kg 1,800.00 244,800.00 Pasir Pasang 0.5440 m³ 118,200.00 64,300.80 Jumlah Bahan 479,050.80 UPAH :Pekerja 1.5000 Oh 60,000.00 90,000.00 Tukang Batu 0.6000 Oh 75,000.00 45,000.00 Kepala Tukang 0.0600 Oh 95,000.00 5,700.00 Mandor 0.0350 Oh 100,000.00 3,500.00 Jumlah Pekerja 144,200.00 Jumlah Bahan + Pekerja 623,250.80

A.03.13 1 M3 PASANG AANSTAMPING BATU KOSONGBAHAN :Batu Belah 15/20 1.2000 m³ 154,500.00 185,400.00 Pasir Urug 0.3000 m³ 100,000.00 30,000.00 Jumlah Bahan 215,400.00 UPAH :Pekerja 0.7800 Oh 60,000.00 46,800.00 Tukang Batu 0.3900 Oh 75,000.00 29,250.00 Kepala Tukang 0.0390 Oh 95,000.00 3,705.00 Mandor 0.0200 Oh 100,000.00 2,000.00 Jumlah Pekerja 81,755.00 Jumlah Bahan + Pekerja 297,155.00

Page 86: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 86+29

1 2 3 4 5 6 = ( 3 x 5 )A.03.14 1 M3 PASANG PONDASI SUMURAN DIAMETER 100 CM

BAHAN :Besi Beton 75.0000 Kg 14,500.00 1,087,500.00 Semen Portland 202.0000 Kg 1,800.00 363,600.00 Pasir Beton 0.3200 m³ 136,400.00 43,648.00 Koral Beton 0.4900 m³ 228,200.00 111,818.00 Kawat Beton 0.8000 Kg 15,500.00 12,400.00 Jumlah Bahan 1,618,966.00 UPAH :Pekerja 3.0000 Oh 60,000.00 180,000.00 Tukang Batu 0.8500 Oh 75,000.00 63,750.00 Kepala Tukang 0.0850 Oh 95,000.00 8,075.00 MAndor 0.1500 Oh 100,000.00 15,000.00 Jumlah Pekerja 266,825.00 Jumlah Bahan + Pekerja 1,885,791.00

A.03.15 1 M3 PASANG PONDASI SIKLOP 40% BATU KALIBAHAN :Batu Belah 15/20 0.4500 m³ 154,500.00 69,525.00 Semen Portland 280.0000 Kg 1,800.00 504,000.00 Pasir Beton 0.4500 m³ 136,400.00 61,380.00 Koral Beton 0.6700 m³ 228,200.00 152,894.00 Jumlah Bahan 787,799.00 UPAH :Pekerja 2.3800 Oh 60,000.00 142,800.00 Tukang Batu 0.3000 Oh 75,000.00 22,500.00 Kepala Tukang 0.0300 Oh 95,000.00 2,850.00 Mandor 0.0160 Oh 100,000.00 1,600.00 Jumlah Pekerja 169,750.00 Jumlah Bahan + Pekerja 957,549.00

A.03.16 1 M1 PEMBUATAN TIANG PANCANG (40 X 40) CM, BETON BERTULANGBAHAN :Pasir Urug Darat 0.0190 m³ 100,000.00 1,900.00 Pasir Beton 0.0940 m³ 136,400.00 12,821.60 Koral Beton 0.1500 m³ 228,200.00 34,230.00 Semen Portland 60.5000 Kg 1,800.00 108,900.00 Besi Beton 45.0000 Kg 14,500.00 652,500.00 Kawat Beton 0.9000 Kg 15,500.00 13,950.00 Kayu Kaso 5/7 Lokal Kelas II 0.0320 m³ 3,545,500.00 113,456.00 Paku 0.1200 Kg 16,400.00 1,968.00 Minyak Bekisting 0.0900 Lt 36,600.00 3,294.00 Plamir Tembok 0.2400 Kg 21,800.00 5,232.00 Jumlah Bahan 948,251.60 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Batu 0.6700 Oh 75,000.00 50,250.00 Kepala Tukang 0.0670 Oh 95,000.00 6,365.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 121,615.00 Jumlah Bahan + Pekerja 1,069,866.60

Page 87: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 87+29

1 2 3 4 5 6 = ( 3 x 5 )A.03.17 1 M1 PEMBUATAN TIANG PANCANG (35 X 35) CM, BETON BERTULANG

BAHAN :Pasir Urug Darat 0.0160 m³ 100,000.00 1,600.00 Pasir Beton 0.0800 m³ 136,400.00 10,912.00 Koral Beton 0.1250 m³ 228,200.00 28,525.00 Semen Portland 49.0000 Kg 1,800.00 88,200.00 Besi Beton 34.0000 Kg 14,500.00 493,000.00 Kawat Beton 0.7000 Kg 15,500.00 10,850.00 Kayu Kaso 5/7 0.0270 m³ 2,000,000.00 54,000.00 Paku 0.1200 Kg 16,400.00 1,968.00 Minyak Bekisting 0.0900 Lt 36,600.00 3,294.00 Plamir Tembok 0.2000 Kg 21,800.00 4,360.00 Jumlah Bahan 696,709.00 UPAH :Pekerja 0.8000 Oh 60,000.00 48,000.00 Tukang Batu 0.5000 Oh 75,000.00 37,500.00 Kepala Tukang 0.0500 Oh 95,000.00 4,750.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 94,250.00 Jumlah Bahan + Pekerja 790,959.00

A.03.18 1 M3 PASANGAN BATU BRONJONGBAHAN :Batu Kali (Batu Bulat) Bronjol 1.2000 m³ 141,800.00 170,160.00 Kawat Bronjong 3.5000 kg 12,300.00 43,050.00 Jumlah Bahan 213,210.00 UPAH :Pekerja 1.5000 Oh 60,000.00 90,000.00 Pekerja terampil 0.2000 Oh 70,000.00 14,000.00 Mandor 0.0200 Oh 100,000.00 2,000.00 Jumlah Pekerja 106,000.00 Jumlah Bahan + Pekerja 319,210.00

A.03.20 1 M3 PASANGAN BATU TEMPEL+ SIARANBAHAN :Batu Tempel 1.1000 m2 ### 212,700.00 233,970.00 Semen Portland 6.0000 Kg 1,800.00 10,800.00 Pasir Pasang 0.0310 m³ 118,200.00 3,664.20 Jumlah Bahan 248,434.20 UPAH :Pekerja 0.1875 Oh 60,000.00 11,250.00 Tukang Batu 0.2250 Oh 75,000.00 16,875.00 Kepala Tukang Batu 0.0375 Oh 95,000.00 3,562.50 Mandor 0.0160 Oh 100,000.00 1,600.00 Jumlah Pekerja 33,287.50 Jumlah Bahan + Pekerja 281,721.70

A.03.21 1 M3 PASANGAN BATU HITAMBAHAN :Batu Hitam 1.0500 m2 212,700.00 223,335.00 Semen Portland 11.7500 Kg 1,800.00 21,150.00 Pasir Pasang 0.0350 m³ 118,200.00 4,137.00 Jumlah Bahan 248,622.00 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang Batu 0.0350 Oh 95,000.00 3,325.00 Mandor 0.0160 Oh 100,000.00 1,600.00 Jumlah Pekerja 68,375.00 Jumlah Bahan + Pekerja 316,997.00

Page 88: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 88+29

1 2 3 4 5 6 = ( 3 x 5 )A.04.05 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc : 5 Ps

BAHAN :Bata Merah 5 x 11 x 22 cm 140.0000 bh 400.00 56,000.00 Semen Portland 22.2000 Kg 1,800.00 39,960.00 Pasir Pasang 0.1020 m³ 118,200.00 12,056.40 Jumlah Bahan 108,016.40 UPAH :Pekerja 0.6500 Oh 60,000.00 39,000.00 Tukang Batu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0150 Oh 100,000.00 1,500.00 Jumlah Pekerja 57,400.00 Jumlah Bahan + Pekerja 165,416.40

A.04.09 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 2 PsBAHAN :Bata Merah 5 x 11 x 22 cm 70.0000 bh 400.00 28,000.00 Semen Portland 18.9500 Kg 1,800.00 34,110.00 Pasir Pasang 0.0380 m³ 118,200.00 4,491.60 Jumlah Bahan 66,601.60 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 28,150.00 Jumlah Bahan + Pekerja 94,751.60

A.04.10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 3 PsBAHAN :Bata Merah 5 x 11 x 22 cm 70.0000 bh 400.00 28,000.00 Semen Portland 14.3700 Kg 1,800.00 25,866.00 Pasir Pasang 0.0400 m³ 118,200.00 4,728.00 Jumlah Bahan 58,594.00 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 28,150.00 Jumlah Bahan + Pekerja 86,744.00

A.04.11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 PsBAHAN :Bata Merah 5 x 11 x 22 cm 70.0000 bh 400.00 28,000.00 Semen Portland 11.5000 Kg 1,800.00 20,700.00 Pasir Pasang 0.0430 m³ 118,200.00 5,082.60 Jumlah Bahan 53,782.60 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 28,150.00 Jumlah Bahan + Pekerja 81,932.60

Page 89: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 89+29

1 2 3 4 5 6 = ( 3 x 5 )A.04.12 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps

BAHAN :Bata Merah 5 x 11 x 22 cm 70.0000 bh 400.00 28,000.00 Semen Portland 9.6800 Kg 1,800.00 17,424.00 Pasir Pasang 0.0450 m³ 118,200.00 5,319.00 Jumlah Bahan 50,743.00 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.1000 Oh 70,000.00 7,000.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 27,650.00 Jumlah Bahan + Pekerja 78,393.00

A.04.18 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB.20)BAHAN :Hollow Block (HB.20) 12.5000 bh 3,200.00 40,000.00 Semen Portland 13.5000 Kg 1,800.00 24,300.00 Pasir Pasang 0.0480 m³ 118,200.00 5,673.60 Besi Beton Polos 1.9500 Kg 14,500.00 28,275.00 Jumlah Bahan 98,248.60 UPAH :Pekerja 0.3500 Oh 60,000.00 21,000.00 Tukang Batu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.0075 Oh 100,000.00 750.00 Jumlah Pekerja 34,425.00 Jumlah Bahan + Pekerja 132,673.60

A.04.19 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB.15)BAHAN :Hollow Block (HB.15) 12.5000 bh 2,900.00 36,250.00 Semen Portland 10.4500 Kg 1,800.00 18,810.00 Pasir Pasang 0.0380 m³ 118,200.00 4,491.60 Besi Beton Polos 1.9500 Kg 14,500.00 28,275.00 Jumlah Bahan 87,826.60 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.1200 Oh 75,000.00 9,000.00 Kepala Tukang 0.0120 Oh 95,000.00 1,140.00 Mandor 0.0060 Oh 100,000.00 600.00 Jumlah Pekerja 29,940.00 Jumlah Bahan + Pekerja 117,766.60

A.04.20 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB.10)BAHAN :Hollow Block (HB.10) 12.5000 bh 2,400.00 30,000.00 Semen Portland 7.5000 Kg 1,800.00 13,500.00 Pasir Pasang 0.0270 m³ 118,200.00 3,191.40 Besi Beton Polos 1.9500 Kg 14,500.00 28,275.00 Jumlah Bahan 74,966.40 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 28,150.00 Jumlah Bahan + Pekerja 103,116.40

Page 90: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 90+29

1 2 3 4 5 6 = ( 3 x 5 )A.04.25 1 M2 PASANGAN DINDING DINDING ROSTER/TERAWANG (12X11X24) KERAMIK

BAHAN :Roster/Terawang 36.0000 bh 40,000.00 1,440,000.00 Semen Portland 0.1280 Kg 1,800.00 230.40 Pasir Pasang 0.0350 m³ 118,200.00 4,137.00 Jumlah Bahan 1,444,367.40 UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Tukang Batu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0150 Oh 100,000.00 1,500.00 Jumlah Pekerja 27,950.00 Jumlah Bahan + Pekerja 1,472,317.40

A.04.27 1 M2 PASANGAN DINDING ANYAMAN BAMBU, RANGKA KAYUBAHAN :Bilik Bambu 1.5000 m2 8,700.00 13,050.00 Kayu 5/7 0.0140 m³ 2,000,000.00 28,000.00 Paku Biasa 2"-5" 0.0120 Kg 16,400.00 196.80 List Kayu 2/4 0.0030 m³ 4,400.00 13.20 Jumlah Bahan 41,260.00 UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Tukang Batu 0.0500 Oh 75,000.00 3,750.00 Kepala Tukang 0.0050 Oh 95,000.00 475.00 Mandor 0.0020 Oh 100,000.00 200.00 Jumlah Pekerja 10,425.00 Jumlah Bahan + Pekerja 51,685.00

A.05.02 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 15 MM + ACIANBAHAN :Semen Portland 8.5200 Kg 1,800.00 15,336.00 Pasir Pasang 0.0170 m³ 118,200.00 2,009.40 Jumlah Bahan 17,345.40 UPAH :Pekerja 0.2000 Oh 60,000.00 12,000.00 Tukang Batu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.0100 Oh 100,000.00 1,000.00 Jumlah Pekerja 25,675.00 Jumlah Bahan + Pekerja 43,020.40

A.05.03 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 15 MM + ACIANBAHAN :Semen Portland 6.4800 Kg 1,800.00 11,664.00 Pasir Pasang 0.0190 m³ 118,200.00 2,245.80 Jumlah Bahan 13,909.80 UPAH :Pekerja 0.2000 Oh 60,000.00 12,000.00 Tukang Batu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.0100 Oh 100,000.00 1,000.00 Jumlah Pekerja 25,675.00 Jumlah Bahan + Pekerja 39,584.80

Page 91: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 91+29

1 2 3 4 5 6 = ( 3 x 5 )A.05.04 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 15 MM + ACIAN

BAHAN :Semen Portland 5.2000 Kg 1,800.00 9,360.00 Pasir Pasang 0.0200 m³ 118,200.00 2,364.00 Jumlah Bahan 11,724.00 UPAH :Pekerja 0.2000 Oh 60,000.00 12,000.00 Tukang Batu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.0100 Oh 100,000.00 1,000.00 Jumlah Pekerja 25,675.00 Jumlah Bahan + Pekerja 37,399.00

A.05.05 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 15 MM + ACIANBAHAN :Semen Portland 4.3200 Kg 1,800.00 7,776.00 Pasir Pasang 0.0220 m³ 118,200.00 2,600.40 Jumlah Bahan 10,376.40 UPAH :Pekerja 0.2000 Oh 60,000.00 12,000.00 Tukang Batu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.0100 Oh 100,000.00 1,000.00 Jumlah Pekerja 25,675.00 Jumlah Bahan + Pekerja 36,051.40

A.05.13 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 20 MM + ACIANBAHAN :Semen Portland 14.2800 Kg 1,800.00 25,704.00 Pasir Pasang 0.0230 m³ 118,200.00 2,718.60 Jumlah Bahan 28,422.60 UPAH :Pekerja 0.2500 Oh 60,000.00 15,000.00 Tukang Batu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0125 Oh 100,000.00 1,250.00 Jumlah Pekerja 33,150.00 Jumlah Bahan + Pekerja 61,572.60

A.05.14 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 20 MM + ACIANBAHAN :Semen Portland 10.8000 Kg 1,800.00 19,440.00 Pasir Pasang 0.0260 m³ 118,200.00 3,073.20 Jumlah Bahan 22,513.20 UPAH :Pekerja 0.2500 Oh 60,000.00 15,000.00 Tukang Batu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0125 Oh 100,000.00 1,250.00 Jumlah Pekerja 33,150.00 Jumlah Bahan + Pekerja 55,663.20

Page 92: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 92+29

1 2 3 4 5 6 = ( 3 x 5 )A.05.15 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 20 MM + ACIAN

BAHAN :Semen Portland 8.6800 Kg 1,800.00 15,624.00 Pasir Pasang 0.0280 m³ 118,200.00 3,309.60 Jumlah Bahan 18,933.60 UPAH :Pekerja 0.2500 Oh 60,000.00 15,000.00 Tukang Batu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0125 Oh 100,000.00 1,250.00 Jumlah Pekerja 33,150.00 Jumlah Bahan + Pekerja 52,083.60

A.05.16 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 20 MM + ACIANBAHAN :Semen Portland 7.2900 Kg 1,800.00 13,122.00 Pasir Pasang 0.0280 m³ 118,200.00 3,309.60 Jumlah Bahan 16,431.60 UPAH :Pekerja 0.2500 Oh 60,000.00 15,000.00 Tukang Batu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0125 Oh 100,000.00 1,250.00 Jumlah Pekerja 33,150.00 Jumlah Bahan + Pekerja 49,581.60

A.05.19 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 25 MM + ACIANBAHAN :Semen Portland 15.5000 Kg 1,800.00 27,900.00 Pasir Pasang 0.0130 m³ 118,200.00 1,536.60 Jumlah Bahan 29,436.60 UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Tukang Batu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0130 Oh 100,000.00 1,300.00 Jumlah Pekerja 36,200.00 Jumlah Bahan + Pekerja 65,636.60

A.05.20 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 25 MM + ACIANBAHAN :Semen Portland 11.7500 Kg 1,800.00 21,150.00 Pasir Pasang 0.0350 m³ 118,200.00 4,137.00 Jumlah Bahan 25,287.00 UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Tukang Batu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0130 Oh 100,000.00 1,300.00 Jumlah Pekerja 36,200.00 Jumlah Bahan + Pekerja 61,487.00

A.05.21 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 25 MM + ACIANBAHAN :Semen Portland 9.4800 Kg 1,800.00 17,064.00 Pasir Pasang 0.0380 m³ 118,200.00 4,491.60 Jumlah Bahan 21,555.60 UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Tukang Batu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0130 Oh 100,000.00 1,300.00 Jumlah Pekerja 36,200.00 Jumlah Bahan + Pekerja 57,755.60

A.05.22 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 25 MM + ACIANBAHAN :Semen Portland 7.9400 Kg 1,800.00 14,292.00 Pasir Pasang 0.0390 m³ 118,200.00 4,609.80 Jumlah Bahan 18,901.80 UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Tukang Batu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0130 Oh 100,000.00 1,300.00 Jumlah Pekerja 36,200.00 Jumlah Bahan + Pekerja 55,101.80

A.05.23 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 30 MM + ACIANBAHAN :

Page 93: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 93+29

1 2 3 4 5 6 = ( 3 x 5 )Semen Portland 18.6500 Kg 1,800.00 33,570.00 Pasir Pasang 0.0350 m³ 118,200.00 4,137.00 Jumlah Bahan 37,707.00 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0150 Oh 100,000.00 1,500.00 Jumlah Pekerja 41,825.00 Jumlah Bahan + Pekerja 79,532.00

A.05.24 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 30 MM + ACIANBAHAN :Semen Portland 14.1500 Kg 1,800.00 25,470.00 Pasir Pasang 0.0390 m³ 118,200.00 4,609.80 Jumlah Bahan 30,079.80 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0150 Oh 100,000.00 1,500.00 Jumlah Pekerja 41,825.00 Jumlah Bahan + Pekerja 71,904.80

A.05.25 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 30 MM + ACIANBAHAN :Semen Portland 11.3800 Kg 1,800.00 20,484.00 Pasir Pasang 0.0420 m³ 118,200.00 4,964.40 Jumlah Bahan 25,448.40 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0150 Oh 100,000.00 1,500.00 Jumlah Pekerja 41,825.00 Jumlah Bahan + Pekerja 67,273.40

A.05.26 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 30 MM + ACIANBAHAN :Semen Portland 8.1900 Kg 1,800.00 14,742.00 Pasir Pasang 0.0450 m³ 118,200.00 5,319.00 Jumlah Bahan 20,061.00 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0150 Oh 100,000.00 1,500.00 Jumlah Pekerja 41,825.00 Jumlah Bahan + Pekerja 61,886.00

A.05.31 1 M2 PASANGAN PLESTERAN SKONING 1 Pc : 2 Ps, TEBAL 15 MMBAHAN :Semen Portland 0.5000 Kg 1,800.00 900.00 Pasir Pasang 0.0020 m³ 118,200.00 236.40 Jumlah Bahan 1,136.40 UPAH :Pekerja 0.0570 Oh 60,000.00 3,420.00 Tukang Batu 0.0380 Oh 75,000.00 2,850.00 Kepala Tukang 0.0380 Oh 95,000.00 3,610.00 Mandor 0.0190 Oh 100,000.00 1,900.00 Jumlah Pekerja 11,780.00 Jumlah Bahan + Pekerja 12,916.40

A.05.34 1 M2 PASANGAN PLESTERAN CIPRAT, 1 Pc : 2 PsBAHAN :Semen Portland 4.3200 Kg 1,800.00 7,776.00 Pasir Pasang 0.0160 kg 118,200.00 1,891.20 Jumlah Bahan 9,667.20 UPAH :Pekerja 0.2500 Oh 60,000.00 15,000.00 Tukang Batu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 23,950.00 Jumlah Bahan + Pekerja 33,617.20

A.05.35 1 M2 PASANGAN PLESTERAN SIAR ADUKAN 1 Pc : 2 PsBAHAN :Semen Portland 4.3200 Kg 1,800.00 7,776.00 Pasir Pasang 0.0160 kg 118,200.00 1,891.20

Page 94: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 94+29

1 2 3 4 5 6 = ( 3 x 5 ) Jumlah Bahan 9,667.20 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Batu 0.0700 Oh 75,000.00 5,250.00 Kepala Tukang 0.0070 Oh 95,000.00 665.00 Mandor 0.0040 Oh 100,000.00 400.00 Jumlah Pekerja 15,315.00 Jumlah Bahan + Pekerja 24,982.20

A.05.36 1 M2 ACIAN PCBAHAN :P.C (50 kg) 0.0800 zak 90,900.00 7,272.00 Jumlah Bahan 7,272.00 UPAH :Pekerja setengah trampil 0.1430 org 65,000.00 9,295.00 Tk. batu setengah trampil 0.1070 org 75,000.00 8,025.00 Kep. Tukang batu 0.0105 org 95,000.00 997.50 Mandor 0.0053 org 100,000.00 525.00 Jumlah Pekerja 18,842.50 Jumlah Bahan + Pekerja 26,114.50

A.06.01 1 M2 PASANGAN KUSEN PINTU DAN JENDELA KAYU JATIBAHAN :Kayu Jati, Balok 1.1000 m³ 12,409,100.00 13,650,010.00 Jumlah Bahan 13,650,010.00 UPAH :Pekerja 6.0000 Oh 60,000.00 360,000.00 Tukang Kayu 15.0000 Oh 75,000.00 1,125,000.00 Kepala Tukang 3.0000 Oh 95,000.00 285,000.00 Mandor 0.5000 Oh 100,000.00 50,000.00 Jumlah Pekerja 1,820,000.00 Jumlah Bahan + Pekerja 15,470,010.00

Page 95: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 95+29

1 2 3 4 5 6 = ( 3 x 5 )A.06.02 1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU KAMPER BANJAR

BAHAN :Kayu Kamper, Balok 1.1000 m³ 8,909,100.00 9,800,010.00 Jumlah Bahan 9,800,010.00 UPAH :Pekerja 6.0000 Oh 60,000.00 360,000.00 Tukang Kayu 15.0000 Oh 75,000.00 1,125,000.00 Kepala Tukang 3.0000 Oh 95,000.00 285,000.00 Mandor 0.5000 Oh 100,000.00 50,000.00 Jumlah Pekerja 1,820,000.00 Jumlah Bahan + Pekerja 11,620,010.00

A.06.03 1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU KAYU LOKAL KLS IIBAHAN :Kayu KAYU LOKAL KLS II , Balok 1.1000 m³ 3,545,500.00 3,900,050.00 Jumlah Bahan 3,900,050.00 UPAH :Pekerja 6.0000 Oh 60,000.00 360,000.00 Tukang Kayu 15.0000 Oh 75,000.00 1,125,000.00 Kepala Tukang 3.0000 Oh 95,000.00 285,000.00 Mandor 0.5000 Oh 100,000.00 50,000.00 Jumlah Pekerja 1,820,000.00 Jumlah Bahan + Pekerja 5,720,050.00

A.06.04 1 M2 PASANGAN PINTU KLAMP KAYU KAYU LOKAL KLS IIBAHAN :Kayu KAYU LOKAL KLS II, Papan 0.0360 m³ 4,018,200.00 144,655.20 Paku Biasa 2"-5" 0.0500 Kg 16,400.00 820.00 Jumlah Bahan 145,475.20 UPAH :Pekerja 0.3500 Oh 60,000.00 21,000.00 Tukang Kayu 1.0500 Oh 75,000.00 78,750.00 Kepala Tukang 0.1050 Oh 95,000.00 9,975.00 Mandor 0.0180 Oh 100,000.00 1,800.00 Jumlah Pekerja 111,525.00 Jumlah Bahan + Pekerja 257,000.20

A.06.05 1 M2 PASANGAN PINTU PANEL KAYU JATIBAHAN :Kayu Jati, Papan 0.0400 m³ 14,227,300.00 569,092.00 Jumlah Bahan 569,092.00 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 276,250.00 Jumlah Bahan + Pekerja 845,342.00

A.06.06 1 M2 PASANGAN PINTU PANEL KAYU KAMPER BANJARBAHAN :Kayu Kamper , Papan 0.0400 m³ 10,000,000.00 400,000.00 Jumlah Bahan 400,000.00 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 276,250.00 Jumlah Bahan + Pekerja 676,250.00 Jumlah Bahan #REF!UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 276,250.00 Jumlah Bahan + Pekerja #REF!

A.06.08 1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU JATIBAHAN :Kayu Jati , Papan 0.0350 m³ 14,227,300.00 497,955.50 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 173,000.00 Jumlah Bahan + Pekerja #REF!

A.06.09 1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU KAMPER BANJARBAHAN :

Page 96: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 96+29

1 2 3 4 5 6 = ( 3 x 5 )Kayu Kamper , Papan 0.0350 m³ 10,000,000.00 350,000.00 Jumlah Bahan 350,000.00 UPAH :Pekerja 0.8000 Oh 60,000.00 48,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 221,000.00 Jumlah Bahan + Pekerja 571,000.00

A.06.10 1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU KAYU LOKAL KLS IIBAHAN :Kayu KAYU LOKAL KLS II , Papan 0.0350 m³ 4,018,200.00 140,637.00 Jumlah Bahan 140,637.00 UPAH :Pekerja 0.8000 Oh 60,000.00 48,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 221,000.00 Jumlah Bahan + Pekerja 361,637.00

A.06.11 1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU JATIBAHAN :Kayu Jati , Papan 0.0640 m³ 14,227,300.00 910,547.20 Jumlah Bahan 910,547.20 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 3.0000 Oh 75,000.00 225,000.00 Kepala Tukang 0.3000 Oh 95,000.00 28,500.00 Mandor 0.1500 Oh 100,000.00 15,000.00 Jumlah Pekerja 328,500.00 Jumlah Bahan + Pekerja 1,239,047.20

Page 97: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 97+29

1 2 3 4 5 6 = ( 3 x 5 )A.06.12 1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU KAMPER BANJAR

BAHAN :Kayu Kamper , Papan 0.0640 m³ 10,000,000.00 640,000.00 Jumlah Bahan 640,000.00 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 3.0000 Oh 75,000.00 225,000.00 Kepala Tukang 0.3000 Oh 95,000.00 28,500.00 Mandor 0.1500 Oh 100,000.00 15,000.00 Jumlah Pekerja 328,500.00 Jumlah Bahan + Pekerja 968,500.00

A.06.13 1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU LOKAL KLS IIBAHAN :Kayu Lokal Kls II , Papan 0.0640 m³ 4,018,200.00 257,164.80 Jumlah Bahan 257,164.80 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 3.0000 Oh 75,000.00 225,000.00 Kepala Tukang 0.3000 Oh 95,000.00 28,500.00 Mandor 0.1500 Oh 100,000.00 15,000.00 Jumlah Pekerja 328,500.00 Jumlah Bahan + Pekerja 585,664.80

A.06.14 1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU JATIBAHAN :Kayu Jati , Papan 0.0196 m³ 14,227,300.00 278,855.08 Paku Biasa 1/2" - 1" 0.0300 kg 16,400.00 492.00 Lem Kayu 0.3000 lt 23,600.00 7,080.00 Plywood 4' x 3' x 4 mm 1.0000 lbr 154,500.00 154,500.00 Jumlah Bahan 440,927.08 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0300 Oh 100,000.00 3,000.00 Jumlah Pekerja 208,000.00 Jumlah Bahan + Pekerja 648,927.08

A.06.15 1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU KAMPER BANJARBAHAN :Kayu Kamper , Papan 0.0196 m³ 10,000,000.00 196,000.00 Paku Biasa 1/2" - 1" 0.0300 kg 16,400.00 492.00 Lem Kayu 0.3000 lt 23,600.00 7,080.00 Plywood 4' x 3' x 4 mm 1.0000 lbr 154,500.00 154,500.00 Jumlah Bahan 358,072.00 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0300 Oh 100,000.00 3,000.00 Jumlah Pekerja 208,000.00 Jumlah Bahan + Pekerja 566,072.00

Page 98: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 98+29

1 2 3 4 5 6 = ( 3 x 5 )A.06.16 1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU LOKAL KLS II

BAHAN :Kayu Lokal Kls II , Papan 0.0196 m³ 4,018,200.00 78,756.72 Paku Biasa 1/2" - 1" 0.0300 kg 16,400.00 492.00 Lem Kayu 0.3000 lt 23,600.00 7,080.00 Plywood 4' x 3' x 4 mm 1.0000 lbr 154,500.00 154,500.00 Jumlah Bahan 240,828.72 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0300 Oh 100,000.00 3,000.00 Jumlah Pekerja 208,000.00 Jumlah Bahan + Pekerja 448,828.72

A.06.17 1 M2 PASANGAN JALUSI MATI KUSEN KAYU JATIBAHAN :Kayu Jati, Papan 0.0600 m³ 14,227,300.00 853,638.00 Paku Biasa 1/2" - 1" 0.1500 kg 16,400.00 2,460.00 Jumlah Bahan 856,098.00 UPAH :Pekerja 0.5000 Oh 60,000.00 30,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0250 Oh 100,000.00 2,500.00 Jumlah Pekerja 201,500.00 Jumlah Bahan + Pekerja 1,057,598.00

A.06.18 1 M2 PASANGAN JALUSI MATI KUSEN KAYU KAMPERBAHAN :Kayu Kamper , Papan 0.0600 m³ 10,000,000.00 600,000.00 Paku Biasa 1/2" - 1" 0.1500 kg 16,400.00 2,460.00 Jumlah Bahan 602,460.00 UPAH :Pekerja 0.5000 Oh 60,000.00 30,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0250 Oh 100,000.00 2,500.00 Jumlah Pekerja 201,500.00 Jumlah Bahan + Pekerja 803,960.00

A.06.19 1 M2 PASANGAN JALUSI MATI KUSEN KAYU LOKAL KLS IIBAHAN :Kayu Lokal Kls II , Papan 0.0600 m³ 4,018,200.00 241,092.00 Paku Biasa 1/2" - 1" 0.1500 kg 16,400.00 2,460.00 Jumlah Bahan 243,552.00 UPAH :Pekerja 0.5000 Oh 60,000.00 30,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0250 Oh 100,000.00 2,500.00 Jumlah Pekerja 201,500.00 Jumlah Bahan + Pekerja 445,052.00

Page 99: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 99+29

1 2 3 4 5 6 = ( 3 x 5 )A.06.20 1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU LOKAL KLS II

BAHAN :Kayu KAYU LOKAL KLS II , Papan 0.0196 m³ 4,018,200.00 78,756.72 Paku Biasa 1/2" - 1" 0.0300 kg 16,400.00 492.00 Lem Kayu 0.3000 lt 23,600.00 7,080.00 Plywood 4' x 3' x 4 mm 1.0000 lbr 190,900.00 190,900.00 Jumlah Bahan 277,228.72 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0300 Oh 100,000.00 3,000.00 Jumlah Pekerja 208,000.00 Jumlah Bahan + Pekerja 485,228.72

A.06.21 1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU JATIBAHAN :Kayu Jati, Papan 0.0196 m³ 14,227,300.00 278,855.08 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 0.3000 lt 23,600.00 7,080.00 Teakwood 4' x 8' x 4 mm 1.0000 lbr 156,900.00 156,900.00 Jumlah Bahan 447,755.08 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0300 Oh 100,000.00 3,000.00 Jumlah Pekerja 208,000.00 Jumlah Bahan + Pekerja 655,755.08

A.06.22 1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU KAMPER BANJARBAHAN :Kayu Kamper, Papan 0.0196 m³ 10,000,000.00 196,000.00 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 0.3000 lt 23,600.00 7,080.00 Teakwood 4' x 8' x 4 mm 1.0000 lbr 156,900.00 156,900.00 Jumlah Bahan 364,900.00 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0300 Oh 100,000.00 3,000.00 Jumlah Pekerja 208,000.00 Jumlah Bahan + Pekerja 572,900.00

A.06.23 1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU LOKAL KLS IIBAHAN :Kayu Lokal Kls II, Papan 0.0196 m³ 4,018,200.00 78,756.72 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 0.3000 lt 23,600.00 7,080.00 Teakwood 4' x 8' x 4 mm 1.0000 lbr 156,900.00 156,900.00 Jumlah Bahan 247,656.72 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Kayu 2.0000 Oh 75,000.00 150,000.00 Kepala Tukang 0.2000 Oh 95,000.00 19,000.00 Mandor 0.0300 Oh 100,000.00 3,000.00 Jumlah Pekerja 208,000.00 Jumlah Bahan + Pekerja 455,656.72

Page 100: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 100+29

1 2 3 4 5 6 = ( 3 x 5 )A.06.24 1 M2 PASANG PINTU POLYWOOD & FORMIKA RANGKAP, RANGKA KAYU JATI

BAHAN :Kayu Jati, Papan 0.0196 m³ 14,227,300.00 278,855.08 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 0.8000 lt 23,600.00 18,880.00 Polywood 4' x 8' x 4 mm 1.0000 lbr 190,900.00 190,900.00 Formica 0.5000 lbr 170,900.00 85,450.00 Jumlah Bahan 579,005.08 UPAH :Pekerja 0.8000 Oh 60,000.00 48,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 263,250.00 Jumlah Bahan + Pekerja 842,255.08

A.06.25 1 M2 PASANG PINTU POLYWOOD & FORMIKA RANGKA KAYU KAMPER BANJARBAHAN :Kayu Kamper, Papan 0.0196 m³ 10,000,000.00 196,000.00 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 0.8000 lt 23,600.00 18,880.00 Polywood 4' x 8' x 4 mm 1.0000 lbr 190,900.00 190,900.00 Formica 4" x 3 " 0.5000 lbr 170,900.00 85,450.00 Jumlah Bahan 496,150.00 UPAH :Pekerja 0.8000 Oh 60,000.00 48,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 263,250.00 Jumlah Bahan + Pekerja 759,400.00

A.06.26 1 M2 PASANG PINTU POLYWOOD & FORMIKA RANGKA KAYU LOKAL KLS IIBAHAN :Kayu Lokal Kls II, Papan 0.0196 m³ 4,018,200.00 78,756.72 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 0.8000 lt 23,600.00 18,880.00 Polywood 4' x 8' x 4 mm 1.0000 lbr 154,500.00 154,500.00 Formica 4" x 3 " 0.5000 lbr 170,900.00 85,450.00 Jumlah Bahan 342,506.72 UPAH :Pekerja 0.8000 Oh 60,000.00 48,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 263,250.00 Jumlah Bahan + Pekerja 605,756.72

A.06.27 1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU JATIBAHAN :Kayu Jati, Papan 0.0196 m³ 14,227,300.00 278,855.08 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 0.8000 lt 23,600.00 18,880.00 Teakwood 4' x 8' x 4 mm 0.5000 lbr 156,900.00 78,450.00 Formica 4" x 8 " 0.5000 lbr 170,900.00 85,450.00 Jumlah Bahan 466,555.08 UPAH :Pekerja 0.8000 Oh 60,000.00 48,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 263,250.00 Jumlah Bahan + Pekerja 729,805.08

Page 101: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 101+29

1 2 3 4 5 6 = ( 3 x 5 )A.06.28 1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU KAMPER BANJAR (DIVERNIS)

BAHAN :Kayu Kamper, Papan 0.0196 m³ 10,000,000.00 196,000.00 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 0.8000 lt 23,600.00 18,880.00 Teakwood 4' x 8' x 4 mm 0.5000 lbr 156,900.00 78,450.00 Formica 4" x 8 " 0.5000 lbr 170,900.00 85,450.00 Vernis 0.5000 ltr 29,100.00 14,550.00 Jumlah Bahan 398,250.00 UPAH :Pekerja 0.8000 Oh 60,000.00 48,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 263,250.00 Jumlah Bahan + Pekerja 661,500.00

A.06.29 1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU LOKAL KLS II (DIVERNIS)BAHAN :Kayu Lokal Kls II, Papan 0.0196 m³ 4,018,200.00 78,756.72 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 0.8000 lt 23,600.00 18,880.00 Teakwood 4' x 8' x 4 mm 0.5000 lbr 156,900.00 78,450.00 Formica 4" x 8 " 0.5000 lbr 170,900.00 85,450.00 Vernis 0.5000 ltr 29,100.00 14,550.00 Jumlah Bahan 281,006.72 UPAH :Pekerja 0.8000 Oh 60,000.00 48,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0400 Oh 100,000.00 4,000.00 Jumlah Pekerja 263,250.00 Jumlah Bahan + Pekerja 544,256.72

A.06.30 1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU JATIBAHAN :Kayu Jati, Papan 0.0196 m³ 14,227,300.00 278,855.08 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 1.2000 lt 23,600.00 28,320.00 Polywood 4' x 8' x 4 mm 1.0000 lbr 190,900.00 190,900.00 Formica 4" x 8 " 1.0000 lbr 170,900.00 170,900.00 Jumlah Bahan 673,895.08 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 2.6000 Oh 75,000.00 195,000.00 Kepala Tukang 0.2600 Oh 95,000.00 24,700.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 284,700.00 Jumlah Bahan + Pekerja 958,595.08

A.06.31 1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU KAMPER BANJARBAHAN :Kayu Kamper, Papan 0.0196 m³ 10,000,000.00 196,000.00 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 1.2000 lt 23,600.00 28,320.00 Polywood 4' x 8' x 4 mm 1.0000 lbr 190,900.00 190,900.00 Formica 4" x 8 " 1.0000 lbr 291,200.00 291,200.00 Jumlah Bahan 711,340.00 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 2.6000 Oh 75,000.00 195,000.00 Kepala Tukang 0.2600 Oh 95,000.00 24,700.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 284,700.00 Jumlah Bahan + Pekerja 996,040.00

Page 102: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 102+29

1 2 3 4 5 6 = ( 3 x 5 )A.06.32 1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU LOKAL KLS II

BAHAN :Kayu Lokal Kls II, Papan 0.0196 m³ 4,018,200.00 78,756.72 Paku Biasa 1/2" - 1" 0.3000 kg 16,400.00 4,920.00 Lem Kayu 1.2000 lt 23,600.00 28,320.00 Polywood 4' x 8' x 4 mm 1.0000 lbr 154,500.00 154,500.00 Formica 4" x 8 " 1.0000 lbr 170,900.00 170,900.00 Jumlah Bahan 437,396.72 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 2.6000 Oh 75,000.00 195,000.00 Kepala Tukang 0.2600 Oh 95,000.00 24,700.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 284,700.00 Jumlah Bahan + Pekerja 722,096.72

A.06.33 1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU JATIBAHAN :Kayu Jati, Balok 1.1000 m³ 12,409,100.00 13,650,010.00 Paku Biasa 2" - 5" 5.8000 kg 16,400.00 95,120.00 Jumlah Bahan 13,745,130.00 UPAH :Pekerja 3.0000 Oh 60,000.00 180,000.00 Tukang Kayu 5.0000 Oh 75,000.00 375,000.00 Kepala Tukang 2.0000 Oh 95,000.00 190,000.00 Mandor 0.4000 Oh 100,000.00 40,000.00 Jumlah Pekerja 785,000.00 Jumlah Bahan + Pekerja 14,530,130.00

A.06.34 1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU KAMPER BANJARBAHAN :Kayu Kamper, Balok 1.1000 m³ 8,909,100.00 9,800,010.00 Paku Biasa 2" - 5" 5.8000 kg 16,400.00 95,120.00 Jumlah Bahan 9,895,130.00 UPAH :Pekerja 3.0000 Oh 60,000.00 180,000.00 Tukang Kayu 5.0000 Oh 75,000.00 375,000.00 Kepala Tukang 2.0000 Oh 95,000.00 190,000.00 Mandor 0.4000 Oh 100,000.00 40,000.00 Jumlah Pekerja 785,000.00 Jumlah Bahan + Pekerja 10,680,130.00

A.06.35 1 M3 PASANGAN KONSTRUKSI KUDA - KUDA KAYU KAYU LOKAL KLS IIBAHAN :Kayu KAYU LOKAL KLS II, Balok 1.1000 m³ 3,545,500.00 3,900,050.00 Paku Biasa 2" - 5" 5.8000 kg 16,400.00 95,120.00 Jumlah Bahan 3,995,170.00 UPAH :Pekerja 3.0000 Oh 60,000.00 180,000.00 Tukang Kayu 5.0000 Oh 75,000.00 375,000.00 Kepala Tukang 2.0000 Oh 95,000.00 190,000.00 Mandor 0.4000 Oh 100,000.00 40,000.00 Jumlah Pekerja 785,000.00 Jumlah Bahan + Pekerja 4,780,170.00

Page 103: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 103+29

1 2 3 4 5 6 = ( 3 x 5 )A.06.36 1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU KRUING

BAHAN :Kayu Kruing, Balok 1.1000 m³ 5,454,500.00 5,999,950.00 Paku Biasa 2" - 5" 5.8000 kg 16,400.00 95,120.00 Jumlah Bahan 6,095,070.00 UPAH :Pekerja 3.0000 Oh 60,000.00 180,000.00 Tukang Kayu 5.0000 Oh 75,000.00 375,000.00 Kepala Tukang 2.0000 Oh 95,000.00 190,000.00 Mandor 0.4000 Oh 100,000.00 40,000.00 Jumlah Pekerja 785,000.00 Jumlah Bahan + Pekerja 6,880,070.00

A.06.37 1 M2 PASANG KASO + RENG GENTENG PALENTONG KAYU KAMPERBAHAN :Kayu Kamper, Balok 0.0120 m³ 8,909,100.00 106,909.20 Paku Biasa 2" - 5" 0.1500 kg 16,400.00 2,460.00 Jumlah Bahan 109,369.20 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.0075 Oh 100,000.00 750.00 Jumlah Pekerja 22,425.00 Jumlah Bahan + Pekerja 131,794.20

A.06.38 1 M2 PASANG KASO + RENG GENTENG PALENTONG KAYU LOKAL KLS IIBAHAN :Kayu KAYU LOKAL KLS II, Balok 0.0142 m³ 3,545,500.00 50,346.10 Paku Biasa 2" - 5" 0.2500 kg 16,400.00 4,100.00 Jumlah Bahan 54,446.10 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.0075 Oh 100,000.00 750.00 Jumlah Pekerja 22,425.00 Jumlah Bahan + Pekerja 76,871.10

A.06.39 1 M2 PASANG KASO + RENG GENTENG BETON KAYU KAYU LOKAL KLS IIBAHAN :Kayu KAYU LOKAL KLS II, Balok 0.0140 m³ 3,545,500.00 49,637.00 Paku Biasa 2" - 5" 0.1500 kg 16,400.00 2,460.00 Jumlah Bahan 52,097.00 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.0075 Oh 100,000.00 750.00 Jumlah Pekerja 22,425.00 Jumlah Bahan + Pekerja 74,522.00

A.06.40 1 M3 PASANG KASO + RENG ATAP SIRAP KAYU KAMPER BANJARBAHAN :Kayu Kamper, Balok 0.0165 m³ 8,909,100.00 147,000.15 Paku Biasa 2" - 5" 0.2000 kg 16,400.00 3,280.00 Jumlah Bahan 150,280.15 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.0075 Oh 100,000.00 750.00 Jumlah Pekerja 22,425.00 Jumlah Bahan + Pekerja 172,705.15

A.06.41 1 M3 PASANG KASO + RENG ATAP SIRAP KAYU KAYU LOKAL KLS IIBAHAN :Kayu KAYU LOKAL KLS II, Balok 0.0165 m³ 3,545,500.00 58,500.75 Paku Biasa 2" - 5" 0.2000 kg 16,400.00 3,280.00 Jumlah Bahan 61,780.75 UPAH :Pekerja 0.1200 Oh 60,000.00 7,200.00 Tukang Kayu 0.1200 Oh 75,000.00 9,000.00 Kepala Tukang 0.0120 Oh 95,000.00 1,140.00 Mandor 0.0060 Oh 100,000.00 600.00 Jumlah Pekerja 17,940.00 Jumlah Bahan + Pekerja 79,720.75

A.06.42 1 M3 PASANG RANGKA LANGIT - LANGIT (1,00 x 1,00) m, KAYU JATIBAHAN :

Page 104: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 104+29

1 2 3 4 5 6 = ( 3 x 5 )Kayu Jati, Balok 0.0120 m³ 12,409,100.00 148,909.20 Paku Biasa 2" - 5" 0.1000 kg 16,400.00 1,640.00 Jumlah Bahan 150,549.20 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0750 Oh 100,000.00 7,500.00 Jumlah Pekerja 37,625.00 Jumlah Bahan + Pekerja 188,174.20

A.06.43 1 M3 PASANG RANGKA LANGIT - LANGIT (1,00 x 1,00) m, KAYU KAMPERBAHAN :Kayu Kamper, Balok 0.0120 m³ 8,909,100.00 106,909.20 Paku Biasa 2" - 5" 0.1000 kg 16,400.00 1,640.00 Jumlah Bahan 108,549.20 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0750 Oh 100,000.00 7,500.00 Jumlah Pekerja 37,625.00 Jumlah Bahan + Pekerja 146,174.20

A.06.44 1 M3 PASANG RANGKA LANGIT - LANGIT (1,00 x 1,00) m, KAYU KAYU LOKAL KLS IIBAHAN :Kayu KAYU LOKAL KLS II, Balok 0.0120 m³ 3,545,500.00 42,546.00 Paku Biasa 2" - 5" 0.1000 kg 16,400.00 1,640.00 Jumlah Bahan 42,546.00 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0750 Oh 100,000.00 7,500.00 Jumlah Pekerja 37,625.00 Jumlah Bahan + Pekerja 80,171.00

A.06.45 1 M2 PASANG LISPLANG UKURAN (3 x 20) cm, KAYU JATIBAHAN :Kayu Jati, Papan 0.0072 m³ 14,227,300.00 102,436.56 Paku Biasa 2" - 5" 0.0500 kg 16,400.00 820.00 Jumlah Bahan 103,256.56 UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Tukang Kayu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 23,875.00 Jumlah Bahan + Pekerja 127,131.56

A.06.46 1 M2 PASANG LISPLANG UKURAN (3 x 20) cm, KAYU KAMPER BANJARBAHAN :Kayu Kamper, Papan 0.0072 m³ 10,000,000.00 72,000.00 Paku Biasa 2" - 5" 0.0500 kg 16,400.00 820.00 Jumlah Bahan 72,820.00 UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Tukang Kayu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 23,400.00 Jumlah Bahan + Pekerja 96,220.00

A.06.47 1 M2 PASANG LISPLANG UKURAN (3 x 20) cm, KAYU LOKAL KLS IIBAHAN :Kayu Lokal Kls II, Papan 0.0072 m³ 4,018,200.00 28,931.04 Paku Biasa 2" - 5" 0.0500 kg 16,400.00 820.00 Jumlah Bahan 29,751.04 UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Tukang Kayu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 23,400.00 Jumlah Bahan + Pekerja 53,151.04

A.06.48 1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU JATIBAHAN :Kayu Jati, Papan 0.0110 m³ 14,227,300.00 156,500.30 Paku Biasa 2" - 5" 0.0500 kg 16,400.00 820.00

Page 105: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 105+29

1 2 3 4 5 6 = ( 3 x 5 ) Jumlah Bahan 157,320.30 UPAH :Pekerja 0.1100 Oh 60,000.00 6,600.00 Tukang Kayu 0.2200 Oh 75,000.00 16,500.00 Kepala Tukang 0.0220 Oh 95,000.00 2,090.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 25,690.00 Jumlah Bahan + Pekerja 183,010.30

A.06.49 1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU KAMPER BANJARBAHAN :Kayu Kamper , Papan 0.0110 m³ 10,000,000.00 110,000.00 Paku Biasa 2" - 5" 0.0500 kg 16,400.00 820.00 Jumlah Bahan 110,820.00 UPAH :Pekerja 0.1100 Oh 60,000.00 6,600.00 Tukang Kayu 0.2200 Oh 75,000.00 16,500.00 Kepala Tukang 0.0220 Oh 95,000.00 2,090.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 25,690.00 Jumlah Bahan + Pekerja 136,510.00

A.06.50 1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU LOKAL KLS IIBAHAN :Kayu Lokal Kls II , Papan 0.0110 m³ 4,018,200.00 44,200.20 Paku Biasa 2" - 5" 0.0500 kg 16,400.00 820.00 Jumlah Bahan 45,020.20 UPAH :Pekerja 0.1100 Oh 60,000.00 6,600.00 Tukang Kayu 0.2200 Oh 75,000.00 16,500.00 Kepala Tukang 0.0220 Oh 95,000.00 2,090.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 25,690.00 Jumlah Bahan + Pekerja 70,710.20

A.06.51 1 M2 PASANG LISPLANG UKURAN 2 x (3 x 20) cm, KAYU KAMPER BANJARBAHAN :Kayu Kamper, Papan 0.0145 m³ 10,000,000.00 145,000.00 Paku Biasa 2" - 5" 0.0600 kg 16,400.00 984.00 Jumlah Bahan 145,984.00 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0750 Oh 100,000.00 7,500.00 Jumlah Pekerja 37,625.00 Jumlah Bahan + Pekerja 183,609.00

A.06.52 1 M2 PASANG LISPLANG UKURAN 2 x (2 x 20) cm, KAYU KAMPER BANJARBAHAN :Kayu Kamper, Papan 0.0086 m³ 10,000,000.00 86,000.00 Paku Biasa 2" - 5" 0.0600 kg 16,400.00 984.00 Jumlah Bahan 86,984.00 UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Tukang Kayu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 19,450.00 Jumlah Bahan + Pekerja 106,434.00

A.06.53 1 M2 PASANG LISPLANG UKURAN 2 x (2 x 20) cm, KAYU LOKAL KLS IIBAHAN :Kayu KAYU LOKAL KLS II, Papan 0.0088 m³ 4,018,200.00 35,360.16 Paku Biasa 2" - 5" 0.0600 kg 16,400.00 984.00 Jumlah Bahan 36,344.16 UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Tukang Kayu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 19,450.00 Jumlah Bahan + Pekerja 55,794.16

A.06.54 1 M2 PASANG RANGKA DINDING PEMISAH KAYU KAMPER BANJARBAHAN :Kayu Kamper, Balok 0.0195 m³ 8,909,100.00 173,727.45 Kayu Kamper, Papan 0.0070 m³ 10,000,000.00 70,000.00 Paku Biasa 2" - 5" 0.1000 kg 16,400.00 1,640.00 Jumlah Bahan 245,367.45

Page 106: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 106+29

1 2 3 4 5 6 = ( 3 x 5 )UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.4500 Oh 75,000.00 33,750.00 Kepala Tukang 0.0450 Oh 95,000.00 4,275.00 Mandor 0.0225 Oh 100,000.00 2,250.00 Jumlah Pekerja 49,275.00 Jumlah Bahan + Pekerja 294,642.45

Page 107: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 107+29

1 2 3 4 5 6 = ( 3 x 5 )A.06.55 1 M2 PASANG RANGKA DINDING PEMISAH KAYU KAYU LOKAL KLS II

BAHAN :Kayu KAYU LOKAL KLS II , Balok 0.0195 m³ 3,545,500.00 69,137.25 Kayu KAYU LOKAL KLS II, Papan 0.0070 m³ 4,018,200.00 28,127.40 Paku Biasa 2" - 5" 0.1000 kg 16,400.00 1,640.00 Jumlah Bahan 98,904.65 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.4500 Oh 75,000.00 33,750.00 Kepala Tukang 0.0450 Oh 95,000.00 4,275.00 Mandor 0.0225 Oh 100,000.00 2,250.00 Jumlah Pekerja 49,275.00 Jumlah Bahan + Pekerja 148,179.65

A.06.56 1 M2 PASANG DINDING PEMISAH , RANGKA KAYU KAMPER BANJARBAHAN :Kayu Kamper, Balok 0.0195 m³ 8,909,100.00 173,727.45 Kayu Kamper, Papan 0.0070 m³ 11,909,100.00 83,363.70 Paku Biasa 2" - 5" 0.1000 kg 16,400.00 1,640.00 Jumlah Bahan 258,731.15 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.4500 Oh 75,000.00 33,750.00 Kepala Tukang 0.0450 Oh 95,000.00 4,275.00 Mandor 0.0225 Oh 100,000.00 2,250.00 Jumlah Pekerja 49,275.00 Jumlah Bahan + Pekerja 308,006.15

A.06.57 1 M2 PASANG DINDING PEMISAH PLYWOOD RANGKAP, RANGKA KAYU KAMPER BANJARBAHAN :Kayu Kamper, Balok 0.0195 m³ 10,000,000.00 195,000.00 Kayu Kamper, Papan 0.0070 m³ 11,909,100.00 83,363.70 Paku Biasa 2" - 5" 0.1000 kg 16,400.00 1,640.00 Lem Kayu 0.5600 m³ 23,600.00 13,216.00 Plywood 4 mm 120 x 240 0.7000 Lbr 154,500.00 108,150.00 Jumlah Bahan 401,369.70 UPAH :Pekerja 0.2000 Oh 60,000.00 12,000.00 Tukang Kayu 0.6000 Oh 75,000.00 45,000.00 Kepala Tukang 0.0600 Oh 95,000.00 5,700.00 Mandor 0.0100 Oh 100,000.00 1,000.00 Jumlah Pekerja 63,700.00 Jumlah Bahan + Pekerja 465,069.70

A.06.58 1 M2 PASANG POLYWOOD TEBAL 4 mm, UNTUK DINDINGBAHAN :Plywood 4 mm 120 x 240 0.7000 lbr 154,500.00 108,150.00 Paku Biasa 1/2" - 1" 0.0500 kg 16,400.00 820.00 Jumlah Bahan 108,970.00 UPAH :Pekerja 0.0250 Oh 60,000.00 1,500.00 Tukang Kayu 0.0750 Oh 75,000.00 5,625.00 Kepala Tukang 0.0075 Oh 95,000.00 712.50 Mandor 0.0013 Oh 100,000.00 130.00 Jumlah Pekerja 7,967.50 Jumlah Bahan + Pekerja 116,937.50

Page 108: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 108+29

1 2 3 4 5 6 = ( 3 x 5 )A.06.59 1 M1 PASANG LIST PLAFOND PROFIL KAYU KAMPER BANJAR 4/4 CM

BAHAN :Kayu Profil 1.0500 m' 7,300.00 7,665.00 Jumlah Bahan 7,665.00 UPAH :Pekerja 0.0210 Oh 60,000.00 1,260.00 Tukang Kayu 0.0210 Oh 75,000.00 1,575.00 Kepala Tukang 0.0020 Oh 95,000.00 190.00 Mandor 0.0010 Oh 100,000.00 100.00 Jumlah Pekerja 3,125.00 Jumlah Bahan + Pekerja 10,790.00

A.06.60 1 M1 PASANG LIST PLAFOND PROFIL KAYU LOKAL KLS II 4/4BAHAN :Kayu Profil 1.0500 m' 4,000.00 4,200.00 Jumlah Bahan 4,200.00 UPAH :Pekerja 0.0210 Oh 60,000.00 1,260.00 Tukang Kayu 0.0210 Oh 75,000.00 1,575.00 Kepala Tukang 0.0020 Oh 95,000.00 190.00 Mandor 0.0010 Oh 100,000.00 100.00 Jumlah Pekerja 3,125.00 Jumlah Bahan + Pekerja 7,325.00

A.06.61 1 M2 PASANGAN PINTU PANEL KAYU LOKAL KLS II LAPIS ALUMUNIUMBAHAN :Kayu Lokal Kls II , Papan 0.0400 m³ 4,018,200.00 160,728.00 Aluminium 1.0000 146,700.00 146,700.00 Jumlah Bahan 307,428.00 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Kayu 2.5000 Oh 75,000.00 187,500.00 Kepala Tukang 0.2500 Oh 95,000.00 23,750.00 Mandor 0.0500 Oh 100,000.00 5,000.00 Jumlah Pekerja 276,250.00 Jumlah Bahan + Pekerja 583,678.00

A.07.01 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 KrBAHAN :Semen Portland 218.0000 kg 1,800.00 392,400.00 Pasir Beton 0.5200 M3 136,400.00 70,928.00 Batu Pecah Mesin 2/3 0.8700 M3 272,700.00 237,249.00 Jumlah Bahan 700,577.00 UPAH :Pekerja 1.6500 Oh 60,000.00 99,000.00 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0800 Oh 100,000.00 8,000.00 Jumlah Pekerja 128,125.00 Jumlah Bahan + Pekerja 828,702.00

A.07.05 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 KrBAHAN :Semen Portland 232.0000 kg 1,800.00 417,600.00 Pasir Beton 0.5200 M3 136,400.00 70,928.00 Batu Pecah Mesin 2/3 0.7800 M3 272,700.00 212,706.00 Jumlah Bahan 701,234.00 UPAH :Pekerja 1.6500 Oh 60,000.00 99,000.00 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.0800 Oh 100,000.00 8,000.00 Jumlah Pekerja 128,125.00 Jumlah Bahan + Pekerja 829,359.00

A.07.13 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 KrBAHAN :Semen Portland 336.0000 kg 1,800.00 604,800.00 Pasir Beton 0.5400 m3 136,400.00 73,656.00 Batu Pecah Mesin 2/3 0.8100 m3 272,700.00 220,887.00 Jumlah Bahan 899,343.00 UPAH :Pekerja 2.0000 Oh 60,000.00 120,000.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 1.0000 Oh 100,000.00 100,000.00 Jumlah Pekerja 249,575.00 Jumlah Bahan + Pekerja 1,148,918.00

A.07.25 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR

m2

Page 109: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 109+29

1 2 3 4 5 6 = ( 3 x 5 )BAHAN :Besi Beton (Polos / ulir) 1.0500 kg 14,500.00 15,225.00 Kawat Beton 0.0150 kg 15,500.00 232.50 Jumlah Bahan 15,457.50 UPAH :Pekerja 0.0070 Oh 60,000.00 420.00 Tukang Besi 0.0070 Oh 75,000.00 525.00 Kepala Tukang 0.0007 Oh 95,000.00 66.50 Mandor 0.0003 Oh 100,000.00 30.00 Jumlah Pekerja 1,041.50 Jumlah Bahan + Pekerja 16,499.00

A.07.28 1 m2 PASANG BEKISTING UNTUK PONDASIBAHAN :Kayu Terentang Albasiah, Papan 0.0400 m³ 2,009,100.00 80,364.00 Paku Biasa 2" - 5" 0.3000 m³ 16,400.00 4,920.00 Minyak Bekisting 0.1000 ltr 36,600.00 3,660.00 Jumlah Bahan 88,944.00 UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Tukang Kayu 0.2600 Oh 75,000.00 19,500.00 Kepala Tukang 0.0260 Oh 95,000.00 2,470.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 40,470.00 Jumlah Bahan + Pekerja 129,414.00

A.07.29 1 m2 PASANG BEKISTING UNTUK SLOOFBAHAN :Kayu Terentang Albasiah, Papan 0.0044 m³ 2,009,100.00 8,840.04 Paku Biasa 2" - 5" 0.3000 m³ 16,400.00 4,920.00 Minyak Bekisting 0.1000 m³ 36,600.00 3,660.00 Jumlah Bahan 17,420.04 UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Tukang Kayu 0.2600 Oh 75,000.00 19,500.00 Kepala Tukang 0.0260 Oh 95,000.00 2,470.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 40,470.00 Jumlah Bahan + Pekerja 57,890.04

Page 110: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 110+29

1 2 3 4 5 6 = ( 3 x 5 )A.07.30 1 m2 PASANG BEKISTING UNTUK KOLOM

BAHAN :Kayu Terentang Albasiah, Papan 0.0040 m³ 2,009,100.00 8,036.40 Paku Biasa 2" - 5" 0.4000 kg 16,400.00 6,560.00 Minyak Bekisting 0.2000 ltr 36,600.00 7,320.00 Kayu Balok Albasiah 0.0015 m³ 2,000,000.00 3,000.00 Jumlah Bahan 24,916.40 UPAH :Pekerja 0.3000 Oh 60,000.00 18,000.00 Tukang Kayu 0.3300 Oh 75,000.00 24,750.00 Kepala Tukang 0.0330 Oh 95,000.00 3,135.00 Mandor 0.0060 Oh 100,000.00 600.00 Jumlah Pekerja 46,485.00 Jumlah Bahan + Pekerja 71,401.40

A.07.31 1 m2 PASANG BEKISTING UNTUK BALOKBAHAN :Kayu Terentang Albasiah, Papan 0.0040 m³ 2,009,100.00 8,036.40 Paku Biasa 2" - 5" 0.4000 kg 16,400.00 6,560.00 Minyak Bekisting 0.2000 ltr 36,600.00 7,320.00 Kayu Balok Albasiah 0.0018 m³ 2,000,000.00 3,600.00

2.0000 btg 106,400.00 212,800.00 Jumlah Bahan 238,316.40 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Kayu 0.3300 Oh 75,000.00 24,750.00 Kepala Tukang 0.0330 Oh 95,000.00 3,135.00 Mandor 0.0060 Oh 100,000.00 600.00 Jumlah Pekerja 47,685.00 Jumlah Bahan + Pekerja 286,001.40

A.07.32 1 m2 PASANG BEKISTING UNTUK LANTAIBAHAN :Kayu Terentang Albasiah, Papan 0.0020 m³ 2,009,100.00 4,018.20 Paku Biasa 2" - 5" 0.4000 kg 16,400.00 6,560.00 Minyak Bekisting 0.2000 ltr 36,600.00 7,320.00 Kayu Balok Albasiah 0.0015 m³ 2,000,000.00 3,000.00 Polywood tebal 9 mm 0.3500 lbr 213,900.00 74,865.00

4.0000 btg 106,400.00 425,600.00 Jumlah Bahan 521,363.20 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Kayu 0.3300 Oh 75,000.00 24,750.00 Kepala Tukang 0.0330 Oh 95,000.00 3,135.00 Mandor 0.0060 Oh 100,000.00 600.00 Jumlah Pekerja 47,685.00 Jumlah Bahan + Pekerja 569,048.20

A.07.33 1 m2 PASANG BEKISTING UNTUK DINDINGBAHAN :Kayu Terentang 0.0300 m³ 2,009,100.00 60,273.00 Paku Biasa 2" - 5" 0.4000 kg 16,400.00 6,560.00 Minyak Bekisting 0.2000 ltr 36,600.00 7,320.00 Balok Kayu KAYU LOKAL KLS II 0.0200 m³ 5,909,100.00 118,182.00 Polywood tebal 9 mm 0.3500 lbr 213,900.00 74,865.00

3.0000 btg 106,400.00 319,200.00 Formtie / Penjaga Jarak Berkisar / Spacer 4.0000 bh - Jumlah Bahan 586,400.00 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Kayu 0.3300 Oh 75,000.00 24,750.00 Kepala Tukang 0.0330 Oh 95,000.00 3,135.00 Mandor 0.0060 Oh 100,000.00 600.00 Jumlah Pekerja 47,685.00 Jumlah Bahan + Pekerja 634,085.00

Dolken Kayu Galam Ø - 8 - 10 / 4 m

Dolken Kayu Galam Ø - 8 - 10 / 4 m

Dolken Kayu Galam Ø - 8 - 10 / 4 m

Page 111: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 111+29

1 2 3 4 5 6 = ( 3 x 5 )A.07.34 1 m2 PASANG BEKISTING UNTUK TANGGA

BAHAN :Kayu Terentang Albasiah, Papan 0.0030 m³ 2,009,100.00 6,027.30 Paku Biasa 2" - 5" 0.4000 kg 16,400.00 6,560.00 Minyak Bekisting 0.1500 ltr 36,600.00 5,490.00 Kayu Balok Albasiah 0.0015 m³ 2,000,000.00 3,000.00 Polywood tebal 9 mm 0.3500 lbr 213,900.00 74,865.00

2.0000 btg 106,400.00 212,800.00 Jumlah Bahan 308,742.30 UPAH :Pekerja 0.3200 Oh 60,000.00 19,200.00 Tukang Kayu 0.3300 Oh 75,000.00 24,750.00 Kepala Tukang 0.0330 Oh 95,000.00 3,135.00 Mandor 0.0060 Oh 100,000.00 600.00 Jumlah Pekerja 47,685.00 Jumlah Bahan + Pekerja 356,427.30

A.07.35 1 M3 MEMBUAT BETON DENGAN MUTU K 225BAHAN :Semen Portland 388.0000 kg 1,800.00 698,400.00 Pasir Beton 0.6500 m³ 136,400.00 88,660.00 Batu Pecah Mesin 2/3 0.6500 m³ 272,700.00 177,255.00 Jumlah Bahan 964,315.00 UPAH :Pekerja 6.0000 Oh 60,000.00 360,000.00 Tukang Batu 1.0000 Oh 75,000.00 75,000.00 Kepala Tukang 0.1000 Oh 95,000.00 9,500.00 Mandor 0.3000 Oh 100,000.00 30,000.00 Jumlah Pekerja 474,500.00 Jumlah Bahan + Pekerja 1,438,815.00

A.07.36 1 M3 MEMBUAT BETON DENGAN MUTU K 275BAHAN :Semen Portland 400.0000 kg 1,800.00 720,000.00 Pasir Beton 0.4000 m³ 136,400.00 54,560.00 Batu Pecah Mesin 2/3 0.8200 m³ 272,700.00 223,614.00 Jumlah Bahan 998,174.00 UPAH :Pekerja 6.0000 Oh 60,000.00 360,000.00 Tukan Batu 1.0000 Oh 75,000.00 75,000.00 Kepala Tukang 0.1000 Oh 95,000.00 9,500.00 Mandor 0.3000 Oh 100,000.00 30,000.00 Jumlah Pekerja 474,500.00 Jumlah Bahan + Pekerja 1,472,674.00

A.07.37 1 M2 PASANG TANGGA PENGECORANBAHAN :Kayu Terentang Albasiah, Papan 0.0264 m³ 2,009,100.00 53,040.24 Paku Biasa 2" - 5" 0.6000 kg 16,400.00 9,840.00

0.5000 btg 106,400.00 53,200.00 Jumlah Bahan 116,080.24 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Batu 0.0500 Oh 75,000.00 3,750.00 Kepala Tukang 0.0050 Oh 95,000.00 475.00 Mandor 0.0070 Oh 100,000.00 700.00 Jumlah Pekerja 13,925.00 Jumlah Bahan + Pekerja 130,005.24

Dolken Kayu Galam Ø - 8 - 10 / 4 m

Dolken Kayu Galam Ø - 8 - 10 / 4 m

Page 112: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 112+29

1 2 3 4 5 6 = ( 3 x 5 )A.07.38 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 kg BESI + BEKISTNG)

BAHAN :Kayu Terentang Albasiah, Papan 0.2000 m³ 2,009,100.00 401,820.00 Paku Biasa 2" - 5" 1.5000 kg 16,400.00 24,600.00 Minyak Bekisting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos 150.0000 kg 14,500.00 2,175,000.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 323.0000 kg 1,800.00 581,400.00 Pasir Beton 0.5200 m3 136,400.00 70,928.00 Batu Pecah Mesin 2/3 0.7800 m3 272,700.00 212,706.00 Jumlah Bahan 3,515,969.00 UPAH :Pekerja 3.9000 Oh 60,000.00 234,000.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Tukang Kayu 1.0400 Oh 75,000.00 78,000.00 Tukang Besi 1.0500 Oh 75,000.00 78,750.00 Kepala Tukang 0.2450 Oh 95,000.00 23,275.00 Mandor 0.1650 Oh 100,000.00 16,500.00 Jumlah Pekerja 456,775.00 Jumlah Bahan + Pekerja 3,972,744.00

A.07.47 1 M3 MEMBUAT SLOOF 10/15 (202 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CMBAHAN :Bekesting Albasiah 0.4400 m³ 2,009,100.00 884,004.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 202.0000 kg 14,500.00 2,929,000.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,757,967.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 5,193,092.00

A.07.48 1 M3 MEMBUAT SLOOF 12/15 (257,778 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CMBAHAN :Bekesting Albasiah 0.3700 m³ 2,009,100.00 743,367.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 257.7780 kg 14,500.00 3,737,781.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 5,426,111.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pembantu Tukang 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 5,861,236.00

Page 113: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 113+29

1 2 3 4 5 6 = ( 3 x 5 )A.07.49 1 M3 MEMBUAT SLOOF 12/15 (170.78 Kg Besi + Bekesting)

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CMBAHAN :Bekesting Albasiah 0.3700 m³ 2,009,100.00 743,367.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 170.7800 kg 14,500.00 2,476,310.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,164,640.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pembantu Tukang 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,599,765.00

A.07.50 1 M3 MEMBUAT SLOOF 15/20 (180,8889 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CMBAHAN :Bekesting Albasiah 0.2900 m³ 2,009,100.00 582,639.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 180.8889 kg 14,500.00 2,622,889.05 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,150,491.05 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pembantu Tukang 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,585,616.05

A.07.51 1 M3 MEMBUAT SLOOF 15/20 (116.89 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CMBAHAN :Bekesting Albasiah 0.2900 m³ 2,009,100.00 582,639.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 116.8900 kg 14,500.00 1,694,905.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,222,507.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pembantu Tukang 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 3,657,632.00

Page 114: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 114+29

1 2 3 4 5 6 = ( 3 x 5 )A.07.52 1 M3 MEMBUAT KOLOM 12/12 (314.0964 Kg Besi + Bekesting)

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CMBAHAN :Bekesting Albasiah 0.4000 m³ 2,009,100.00 803,640.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 314.0964 kg 14,500.00 4,554,397.80 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 6,303,000.80 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 6,738,125.80

A.07.53 1 M3 MEMBUAT KOLOM 12/12 (208.864 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CMBAHAN :Bekesting Albasiah 0.4000 m³ 2,009,100.00 803,640.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 208.8640 kg 14,500.00 3,028,528.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,777,131.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 5,212,256.00

A.07.54 1 M3 MEMBUAT KOLOM 15/15 (211,5556 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CMBAHAN :Bekesting Albasiah 0.5300 m³ 2,009,100.00 1,064,823.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 211.5556 kg 14,500.00 3,067,556.20 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 5,077,342.20 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 5,512,467.20

Page 115: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 115+29

1 2 3 4 5 6 = ( 3 x 5 )A.07.55 1 M3 MEMBUAT KOLOM 15/15 (139.550 Kg Besi + Bekesting)

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CMBAHAN :Bekesting Albasiah 0.5300 m³ 2,009,100.00 1,064,823.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 139.5500 kg 14,500.00 2,023,475.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,033,261.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,468,386.00

A.07.56 1 M3 MEMBUAT KOLOM 15/20 (180,8889 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CMBAHAN :Bekesting Albasiah 0.4700 m³ 2,009,100.00 944,277.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 180.8889 kg 14,500.00 2,622,889.05 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,512,129.05 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,947,254.05

A.07.57 1 M3 MEMBUAT KOLOM 15/20 (116.889 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CMBAHAN :Bekesting Albasiah 0.4700 m³ 2,009,100.00 944,277.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 116.8890 kg 14,500.00 1,694,890.50 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,584,130.50 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,019,255.50

Page 116: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 116+29

1 2 3 4 5 6 = ( 3 x 5 )A.07.59 1 M3 MEMBUAT KOLOM 20/20 (142,333 Kg Besi + Bekesting)

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CMBAHAN :Bekesting Albasiah 0.4400 m³ 2,009,100.00 884,004.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 142.3333 kg 14,500.00 2,063,832.85 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,892,799.85 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,327,924.85

A.07.60 1 M3 MEMBUAT KOLOM 20/20 (91.334 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CMBAHAN :Bekesting Albasiah 0.4400 m³ 2,009,100.00 884,004.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 91.3340 kg 14,500.00 1,324,343.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,153,310.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 3,588,435.00

A.07.61 1 M3 MEMBUAT KOLOM 25/25 (99.6267 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CMBAHAN :Bekesting Albasiah 0.3500 m³ 2,009,100.00 703,185.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 99.6267 kg 14,500.00 1,444,587.15 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,092,735.15 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 3,527,860.15

Page 117: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 117+29

1 2 3 4 5 6 = ( 3 x 5 )A.07.62 1 M3 MEMBUAT KOLOM 30/30 (74,67 Kg Besi + Bekesting)

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CMBAHAN :Bekesting Albasiah 0.3500 m³ 2,009,100.00 703,185.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 74.6700 kg 14,500.00 1,082,715.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 20,900.00 135,014.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 2,278,663.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 2,713,788.00

A.07.63 1 M3 MEMBUAT KOLOM 40/25 (153,067 Kg Besi + Bekesting)DENGAN TULANGAN 8 BATANG DIA 16 BEUGEL DIA 8 JARAK 15 CMBAHAN :Bekesting Albasiah 0.2900 m³ 2,009,100.00 582,639.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 153.0670 kg 14,500.00 2,219,471.50 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 20,900.00 135,014.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,294,873.50 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 3,729,998.50

A.07.64 1 M3 MEMBUAT RING BALK 10/15 (202 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CMBAHAN :Bekesting Albasiah 0.4800 m³ 2,009,100.00 964,368.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 202.0000 kg 14,500.00 2,929,000.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,838,331.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 5,273,456.00

Page 118: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 118+29

1 2 3 4 5 6 = ( 3 x 5 )A.07.65 1 M3 MEMBUAT RING BALK 10/15 (202 Kg Besi + Bekesting)

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CMBAHAN :Bekesting Albasiah 0.4800 m³ 2,009,100.00 964,368.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 202.0000 kg 14,500.00 2,929,000.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,838,331.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 5,273,456.00

A.07.66 1 M3 MEMBUAT BALOK 12/15 (217.7900 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CMBAHAN :Bekesting Albasiah 0.5600 m³ 2,009,100.00 1,125,096.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 217.7900 kg 14,500.00 3,157,955.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 5,228,014.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 5,663,139.00

A.07.67 1 M3 MEMBUAT RING BALK 15/15 (211,5556 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CMBAHAN :Bekesting Albasiah 0.3200 m³ 2,009,100.00 642,912.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 211.5556 kg 14,500.00 3,067,556.20 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,655,431.20 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 5,090,556.20

Page 119: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 119+29

1 2 3 4 5 6 = ( 3 x 5 )A.07.68 1 M3 MEMBUAT RING BALK 15/15 (139.550 Kg Besi + Bekesting)

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CMBAHAN :Bekesting Albasiah 0.3200 m³ 2,009,100.00 642,912.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 139.5500 kg 14,500.00 2,023,475.00 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,611,350.00 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,046,475.00

A.07.69 1 M3 MEMBUAT RING BALK 15/20 (180,8889 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CMBAHAN :Bekesting Albasiah 0.3200 m³ 2,009,100.00 642,912.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 180.8889 kg 14,500.00 2,622,889.05 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,210,764.05 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,645,889.05

A.07.70 1 M3 MEMBUAT RING BALK 15/20 (116,889 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CMBAHAN :Bekesting Albasiah 0.3200 m³ 2,009,100.00 642,912.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 116.8890 kg 14,500.00 1,694,890.50 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,282,765.50 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 3,717,890.50

Page 120: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 120+29

1 2 3 4 5 6 = ( 3 x 5 )A.07.71 1 M3 MEMBUAT RING BALK 15/25 (151,8222 Kg Besi + Bekesting)

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CMBAHAN :Bekesting Albasiah 0.3200 m³ 2,009,100.00 642,912.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 151.8222 kg 14,500.00 2,201,421.90 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,789,296.90 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,224,421.90

A.07.72 1 M3 MEMBUAT RING BALK 15/25 ( 97.423 Kg Besi + Bekesting)DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CMBAHAN :Bekesting Albasiah 0.3200 m³ 2,009,100.00 642,912.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 97.4230 kg 14,500.00 1,412,633.50 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 3,000,508.50 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 3,435,633.50

A.07.73 1 M3 MEMBUAT RING BALK 15/25 (175,5556 Kg Besi + Bekesting)DENGAN TULANGAN 5 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CMBAHAN :Bekesting Albasiah 0.3200 m³ 2,009,100.00 642,912.00 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 175.5556 kg 14,500.00 2,545,556.20 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Jumlah Bahan 4,133,431.20 UPAH : Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pekerja 3.0000 org 60,000.00 180,000.00 Mandor 0.1225 org 100,000.00 12,250.00 Jumlah Pekerja 435,125.00 Jumlah Bahan + Pekerja 4,568,556.20

Page 121: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 121+29

1 2 3 4 5 6 = ( 3 x 5 )A.07.74 1 M2 PASANGAN LANTAI BATU SIKAT

BAHAN :Batu sikat 0,5 / 2 cm 1.0000 m² 40,000.00 40,000.00 P.C (50 kg) + Campuran khusus 0.2600 zak 1,800.00 468.00 Pasir pasang 0.0300 m³ 118,200.00 3,546.00 Jumlah Bahan 44,014.00 UPAH : Pekerja 0.5000 org 60,000.00 30,000.00 Tk. batu 1.5000 org 75,000.00 112,500.00 Kep. Tukang batu 0.1000 org 95,000.00 9,500.00 Mandor 0.0250 org 100,000.00 2,500.00 Jumlah Pekerja 154,500.00 Jumlah Bahan + Pekerja 198,514.00

A.07.75 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.10 JARAK 10 cm TEBAL 10 cmBAHAN :Semen Portland 232.0000 kg 1,800.00 417,600.00 Pasir Beton 0.5200 lbr 136,400.00 70,928.00 Batu Pecah Mesin 2/3 0.7800 M3 272,700.00 212,706.00 Besi Beton (Polos / ulir) 137.3610 Kg 14,500.00 1,991,734.50 Kawat Beton 1.9623 Kg 15,500.00 30,415.65 Kayu Terentang Albasiah, Papan 0.2450 m³ 2,009,100.00 492,229.50 Paku Biasa 2" - 5" 0.1500 kg 16,400.00 2,460.00 Minyak Bekisting 1.4000 Ltr 36,600.00 51,240.00 Kayu Balok Albasiah 0.0700 m³ 2,000,000.00 140,000.00 Jumlah Bahan 3,409,313.65 UPAH :Pekerja 6.4697 Oh 60,000.00 388,184.40 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Tukang Kayu 4.0260 Oh 75,000.00 301,950.00 Tukang Besi 1.0073 Oh 75,000.00 75,548.55 Kepala Tukang 0.5192 Oh 95,000.00 49,321.53 Mandor 0.1924 Oh 100,000.00 19,244.60 Jumlah Pekerja 852,999.08 Jumlah Bahan + Pekerja 4,262,312.73

A.07.76 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 10 cmBAHAN :Semen Portland 232.0000 kg 1,800.00 417,600.00 Pasir Beton 0.5200 lbr 136,400.00 70,928.00 Batu Pecah Mesin 2/3 0.7800 M3 272,700.00 212,706.00 Besi Beton (Polos / ulir) 197.1795 Kg 14,500.00 2,859,102.75 Kawat Beton 2.8168 Kg 15,500.00 43,661.17 Kayu Terentang Albasiah, Papan 0.2450 m³ 2,009,100.00 492,229.50 Paku Biasa 2" - 5" 0.1500 kg 16,400.00 2,460.00 Minyak Bekisting 1.4000 Ltr 36,600.00 51,240.00 Kayu Balok Albasiah 0.0700 m³ 2,000,000.00 140,000.00 Jumlah Bahan 4,289,927.43 UPAH :Pekerja 6.4697 Oh 60,000.00 388,184.40 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Tukang Kayu 4.0260 Oh 75,000.00 301,950.00 Tukang Besi 1.0073 Oh 75,000.00 75,548.55 Kepala Tukang 0.5192 Oh 95,000.00 49,321.53 Mandor 0.1924 Oh 100,000.00 19,244.60 Jumlah Pekerja 852,999.08 Jumlah Bahan + Pekerja 5,142,926.51

Page 122: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 122+29

1 2 3 4 5 6 = ( 3 x 5 )A.07.77 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 12 cm

BAHAN :Semen Portland 232.0000 kg 1,800.00 417,600.00 Pasir Beton 0.5200 lbr 136,400.00 70,928.00 Batu Pecah Mesin 2/3 0.7800 M3 272,700.00 212,706.00 Besi Beton (Polos / ulir) 164.1262 Kg 14,500.00 2,379,830.41 Kawat Beton 2.3447 Kg 15,500.00 36,342.24 Kayu Terentang Albasiah, Papan 0.2450 m³ 2,009,100.00 492,229.50 Paku Biasa 2" - 5" 0.1500 kg 16,400.00 2,460.00 Minyak Bekisting 1.4000 Ltr 36,600.00 51,240.00 Kayu Balok Albasiah 0.0700 m³ 2,000,000.00 140,000.00 Jumlah Bahan 3,803,336.15 UPAH :Pekerja 6.4697 Oh 60,000.00 388,184.40 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Tukang Kayu 4.0260 Oh 75,000.00 301,950.00 Tukang Besi 1.0073 Oh 75,000.00 75,548.55 Kepala Tukang 0.5192 Oh 95,000.00 49,321.53 Mandor 0.1924 Oh 100,000.00 19,244.60 Jumlah Pekerja 852,999.08 Jumlah Bahan + Pekerja 4,656,335.23

A.07.78 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.12 JARAK 10 cm TEBAL 12 cmBAHAN :Semen Portland 232.0000 kg 1,800.00 417,600.00 Pasir Beton 0.5200 lbr 136,400.00 70,928.00 Batu Pecah Mesin 2/3 0.7800 M3 272,700.00 212,706.00 Besi Beton (Polos / ulir) 349.5591 Kg 14,500.00 5,068,606.52 Kawat Beton 4.9937 Kg 15,500.00 77,402.37 Kayu Terentang Albasiah, Papan 0.2450 m³ 2,009,100.00 492,229.50 Paku Biasa 2" - 5" 0.1500 kg 16,400.00 2,460.00 Minyak Bekisting 1.4000 Ltr 36,600.00 51,240.00 Kayu Balok Albasiah 0.0700 m³ 2,000,000.00 140,000.00 Jumlah Bahan 6,533,172.38 UPAH :Pekerja 6.4697 Oh 60,000.00 388,184.40 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Tukang Kayu 4.0260 Oh 75,000.00 301,950.00 Tukang Besi 1.0073 Oh 75,000.00 75,548.55 Kepala Tukang 0.5192 Oh 95,000.00 49,321.53 Mandor 0.1924 Oh 100,000.00 19,244.60 Jumlah Pekerja 852,999.08 Jumlah Bahan + Pekerja 7,386,171.46

A.07.79 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.16-17.5CM DAN DIA. 10-12.5 cm TEBAL 20 cmBAHAN :Semen Portland 232.0000 kg 1,800.00 417,600.00 Pasir Beton 0.5200 lbr 136,400.00 70,928.00 Batu Pecah Mesin 2/3 0.7800 M3 272,700.00 212,706.00 Besi Beton (Polos / ulir) 176.4000 Kg 14,500.00 2,557,800.00 Kawat Beton 2.5200 Kg 15,500.00 39,060.00 Kayu Terentang Albasiah, Papan 0.2450 m³ 2,009,100.00 492,229.50 Paku Biasa 2" - 5" 0.1500 kg 16,400.00 2,460.00 Minyak Bekisting 1.4000 Ltr 36,600.00 51,240.00 Kayu Balok Albasiah 0.0700 m³ 2,000,000.00 140,000.00 Jumlah Bahan 3,984,023.50 UPAH :Pekerja 5.1940 Oh 60,000.00 311,640.00 Tukang Batu 0.2500 Oh 75,000.00 18,750.00 Tukang Kayu 2.4420 Oh 75,000.00 183,150.00 Tukang Besi 1.2936 Oh 75,000.00 97,020.00 Kepala Tukang 0.3868 Oh 95,000.00 36,746.00 Mandor 0.1748 Oh 100,000.00 17,480.00 Jumlah Pekerja 664,786.00 Jumlah Bahan + Pekerja 4,648,809.50

Page 123: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 123+29

1 2 3 4 5 6 = ( 3 x 5 )A.08.02 1 M2 PASANG ATAP GENTENG PALENTONG

BAHAN :Genteng Palentong 25.0000 buah 2,200.00 55,000.00 Jumlah Bahan 55,000.00 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.0750 Oh 75,000.00 5,625.00 Kepala Tukang 0.0080 Oh 95,000.00 760.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 15,885.00 Jumlah Bahan + Pekerja 70,885.00

A.08.03 1 M2 PASANG ATAP GENTENG MORANDO NATURAL (18 BH)BAHAN :Genteng Morando Natural 18.0000 buah 3,000.00 54,000.00 Jumlah Bahan 54,000.00 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.0600 Oh 75,000.00 4,500.00 Kepala Tukang 0.0060 Oh 95,000.00 570.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 14,570.00 Jumlah Bahan + Pekerja 68,570.00

A.08.05 1 M2 PASANG BUBUNG GENTENG PALENTONGBAHAN :Genteng Bubung Palentong 5.0000 buah 2,900.00 14,500.00 Semen Portland 8.0000 kg 1,800.00 14,400.00 Pasir Pasang 0.0320 buah 118,200.00 3,782.40 Jumlah Bahan 32,682.40 UPAH :Pekerja 0.4000 Oh 60,000.00 24,000.00 Tukang Kayu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0020 Oh 100,000.00 200.00 Jumlah Pekerja 41,100.00 Jumlah Bahan + Pekerja 73,782.40

A.08.06 1 M2 PASANG BUBUNG GENTENG MORANDO NATURALBAHAN :Genteng Bubung Morando Natural 4.0000 buah 5,100.00 20,400.00 Semen Portland 8.0000 kg 1,800.00 14,400.00 Pasir Pasang 0.0320 buah 118,200.00 3,782.40 Jumlah Bahan 38,582.40 UPAH :Pekerja 0.4000 Oh 60,000.00 24,000.00 Tukang Kayu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.0020 Oh 100,000.00 200.00 Jumlah Pekerja 41,100.00 Jumlah Bahan + Pekerja 79,682.40

A.08.11 1 M2 PASANG ATAP ASBES GELOMBANG (1,80 x 0,90m) x 5 mmBAHAN :Asbes Gelombang 0.6200 lbr 124,900.00 77,438.00 Paku Pancing 60 x 230 0.1200 kg 22,700.00 2,724.00 Jumlah Bahan 80,162.00 UPAH :Pekerja 0.1400 Oh 60,000.00 8,400.00 Tukang Kayu 0.0700 Oh 75,000.00 5,250.00 Kepala Tukang 0.0070 Oh 95,000.00 665.00 Mandor 0.0035 Oh 100,000.00 350.00 Jumlah Pekerja 14,665.00 Jumlah Bahan + Pekerja 94,827.00

A.08.12 1 M2 PASANG ATAP ASBES GELOMBANG (0,80 x 1,80m) x 5 mmBAHAN :Asbes Gelombang 0.6200 lbr 83,600.00 51,832.00 Paku Pancing 0.1200 kg 22,700.00 2,724.00 Jumlah Bahan 54,556.00 UPAH :Pekerja 0.1400 Oh 60,000.00 8,400.00 Tukang Kayu 0.0700 Oh 75,000.00 5,250.00 Kepala Tukang 0.0070 Oh 95,000.00 665.00 Mandor 0.0035 Oh 100,000.00 350.00 Jumlah Pekerja 14,665.00 Jumlah Bahan + Pekerja 69,221.00

A.08.13 1 M2 PASANG ATAP ASBES GELOMBANG (0,90m x 1,80m) x 4 mmBAHAN :

Page 124: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 124+29

1 2 3 4 5 6 = ( 3 x 5 )Asbes Gelombang 0.6200 lbr 72,700.00 45,074.00 Paku Pancing 0.1200 kg 22,700.00 2,724.00 Jumlah Bahan 47,798.00 UPAH :Pekerja 0.1400 Oh 60,000.00 8,400.00 Tukang Kayu 0.0700 Oh 75,000.00 5,250.00 Kepala Tukang 0.0070 Oh 95,000.00 665.00 Mandor 0.0070 Oh 100,000.00 700.00 Jumlah Pekerja 15,015.00 Jumlah Bahan + Pekerja 62,813.00

A.08.14 1 M' PASANG NOK ASBES GELOMBANG , 4 mmBAHAN :Asbes Gelombang 1.1000 bh 40,000.00 44,000.00 Paku Pancing 0.0240 kg 22,700.00 544.80 Jumlah Bahan 44,544.80 UPAH :Pekerja 0.0160 Oh 60,000.00 960.00 Tukang Kayu 0.0800 Oh 75,000.00 6,000.00 Kepala Tukang 0.0080 Oh 95,000.00 760.00 Mandor 0.0040 Oh 100,000.00 400.00 Jumlah Pekerja 8,120.00 Jumlah Bahan + Pekerja 52,664.80

A.08.30 1 M2 PASANG ATAP GENTENG BETONBAHAN :Genteng Beton 11.0000 bh 6,000.00 66,000.00 Paku Biasa 2" - 5" 0.0300 kg 16,400.00 492.00 Jumlah Bahan 66,492.00 UPAH :Pekerja 0.2000 Oh 60,000.00 12,000.00 Tukang Kayu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0010 Oh 100,000.00 100.00 Jumlah Pekerja 20,550.00 Jumlah Bahan + Pekerja 87,042.00

A.09.02 1 M2 LANGIT - LANGIT ETERNIT (1,00 x 1,00) m , TEBAL 4 mmBAHAN :Eternit 1.1000 lbr 15,400.00 16,940.00 Paku 0.0100 kg 16,400.00 164.00 Jumlah Bahan 17,104.00 UPAH :Pekerja 0.0300 Oh 60,000.00 1,800.00 Tukang Kayu 0.0700 Oh 75,000.00 5,250.00 Kepala Tukang 0.0070 Oh 95,000.00 665.00 Mandor 0.0015 Oh 100,000.00 150.00 Jumlah Pekerja 7,865.00 Jumlah Bahan + Pekerja 24,969.00

A.09.24 1 M2 LANGIT - LANGIT GYPSUM BOARD, TEBAL 9 mmBAHAN :Gypsum Board (120 x 240 x9) mm 0.3640 lbr 98,200.00 35,744.80 Paku Sekrup 0.1100 kg 12,300.00 1,353.00 Jumlah Bahan 37,097.80 UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Tukang Kayu 0.0500 Oh 75,000.00 3,750.00 Kepala Tukang 0.0050 Oh 95,000.00 475.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 10,725.00 Jumlah Bahan + Pekerja 47,822.80

A.10.01 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOKBAHAN :Kloset duduk/monoblok 1.0000 bh 1,997,700.00 1,997,700.00

Perlengkapan 0.0600 1,997,700.00 119,862.00

Jumlah Bahan 2,117,562.00 UPAH :Pekerja 2.1000 Oh 60,000.00 126,000.00 Tukang Batu 0.9600 Oh 75,000.00 72,000.00 Kepala Tukang 0.0010 Oh 95,000.00 95.00 Mandor 0.1600 Oh 100,000.00 16,000.00 Jumlah Pekerja 214,095.00

Jumlah Bahan + Pekerja 2,331,657.00 A.10.02 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN

BAHAN :Kloset Jongkok porselen 1.0000 bh 198,500.00 198,500.00

harga kloset

Page 125: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 125+29

1 2 3 4 5 6 = ( 3 x 5 )Semen Portland 6.0000 kg 1,800.00 10,800.00 Pasir Pasang 0.0100 m³ 118,200.00 1,182.00 Jumlah Bahan 210,482.00 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Batu 0.3000 Oh 75,000.00 22,500.00 Kepala Tukang 0.1500 Oh 95,000.00 14,250.00 Mandor 0.0800 Oh 100,000.00 8,000.00 Jumlah Pekerja 80,750.00

Jumlah Bahan + Pekerja 291,232.00 A.10.04 MEMASANG 1 BUAH URINOIR

BAHAN :Urinoir 1.0000 bh 2,320,400.00 2,320,400.00

Perlengkapan 0.3000 2,320,400.00 696,120.00

Semen Portland 6.0000 kg 1,800.00 10,800.00 Pasir Pasang 0.0100 m³ 118,200.00 1,182.00 Jumlah Bahan 3,028,502.00 UPAH :Pekerja 1.0000 Oh 60,000.00 60,000.00 Tukang Batu 0.9000 Oh 75,000.00 67,500.00 Kepala Tukang 0.1000 Oh 95,000.00 9,500.00 Mandor 0.1000 Oh 100,000.00 10,000.00 Jumlah Pekerja 147,000.00

Jumlah Bahan + Pekerja 3,175,502.00

hrg urinoir

Page 126: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 126+29

1 2 3 4 5 6 = ( 3 x 5 )A.10.05 MEMASANG 1 BUAH WASTAFEL

BAHAN :Wastafel 1.0000 bh 930,500.00 930,500.00

Perlengkapan 0.1200 930,500.00 111,660.00

Semen Abu-abu 6.0000 kg 1,800.00 10,800.00 Pasir Pasang 0.0100 m³ 118,200.00 1,182.00 Jumlah Bahan 1,054,142.00 UPAH :Pekerja 1.2000 Oh 60,000.00 72,000.00 Tukang Batu 1.4500 Oh 75,000.00 108,750.00 Kepala Tukang 0.1500 Oh 95,000.00 14,250.00 Mandor 0.1000 Oh 100,000.00 10,000.00 Jumlah Pekerja 205,000.00

Jumlah Bahan + Pekerja 1,259,142.00 A.10.06 MEMASANG 1 BUAH BAK MANDI TRASO VOLUME 0,3 M3

BAHAN :Bak Teraso 1.0000 bh 370,900.00 370,900.00 Semen Portland 6.0000 kg 1,800.00 10,800.00 Pasir Pasang 0.0100 m³ 118,200.00 1,182.00 Jumlah Bahan 382,882.00 UPAH :Pekerja 2.1000 Oh 60,000.00 126,000.00 Tukang Batu 0.7500 Oh 75,000.00 56,250.00 Kepala Tukang 0.0700 Oh 95,000.00 6,650.00 Mandor 0.1100 Oh 100,000.00 11,000.00 Jumlah Pekerja 199,900.00

Jumlah Bahan + Pekerja 582,782.00 A.10.07 MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3

BAHAN :Bak Fibreglass 1.0000 bh 173,600.00 173,600.00 Perlengkapan 0.1800 hrg bak 173,600.00 31,248.00 Jumlah Bahan 204,848.00 UPAH :Pekerja 1.8000 Oh 60,000.00 108,000.00 Tukang Batu 0.6000 Oh 75,000.00 45,000.00 Kepala Tukang 0.5400 Oh 95,000.00 51,300.00 Mandor 0.1100 Oh 100,000.00 11,000.00 Jumlah Pekerja 215,300.00

Jumlah Bahan + Pekerja 420,148.00 A.10.08 MEMASANG 1 BUAH BAK MANDI BATU BATA VOLUME 0,3 M3

BAHAN :Batu Bata 110.0000 bh 400.00 44,000.00 Semen Portland 80.0000 kg 1,800.00 144,000.00 Pasir Pasang 0.3000 m³ 118,200.00 35,460.00 Porselen (11x11)cm 216.0000 bh 763.46 164,907.44 Semen nat 6.0000 kg 9,100.00 54,600.00 Jumlah Bahan 442,967.44 UPAH :Pekerja 2.0000 Oh 60,000.00 120,000.00 Tukang Batu 1.0000 Oh 75,000.00 75,000.00 Kepala Tukang 0.3000 Oh 95,000.00 28,500.00 Mandor 0.1500 Oh 100,000.00 15,000.00 Jumlah Pekerja 238,500.00

Jumlah Bahan + Pekerja 681,467.44

hrg kloset

Page 127: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 127+29

1 2 3 4 5 6 = ( 3 x 5 )A.10.09 MEMASANG 1 BUAH BADKIP PORSELEN

BAHAN :Badkip 1.0000 m³ 2,970,500.00 2,970,500.00

Perlengkapan 0.2000 2,970,500.00 594,100.00

Jumlah Bahan 3,564,600.00 UPAH :Pekerja - Oh 60,000.00 - Tukang Batu 0.0750 Oh 75,000.00 5,625.00 Kepala Tukang 0.7500 Oh 95,000.00 71,250.00 Mandor 0.2500 Oh 100,000.00 25,000.00 Jumlah Pekerja 101,875.00

Jumlah Bahan + Pekerja 3,666,475.00 A.10.16 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (30X30) TINGGI 35 CM

BAHAN :Batu Bata 0.1450 bh 400.00 58.00 Semen Portland 44.0000 kg 1,800.00 79,200.00 Pasir Pasang 0.0700 m3 118,200.00 8,274.00 Batu Kerikil 0.0700 m3 272,700.00 19,089.00 Besi beton 1.6000 kg 14,500.00 23,200.00 Pasir Beton 0.0600 m3 136,400.00 8,184.00 Jumlah Bahan 138,005.00 UPAH :Pekerja 3.2000 Oh 60,000.00 192,000.00 Tukang Batu 1.0150 Oh 75,000.00 76,125.00 Kepala Tukang 0.0015 Oh 95,000.00 142.50 Mandor 0.0160 Oh 100,000.00 1,600.00 Jumlah Pekerja 269,867.50

Jumlah Bahan + Pekerja 407,872.50 A.10.17 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (45X45) TINGGI 50 CM

BAHAN :Batu Bata 0.2500 m3 400.00 100.00 Semen Portland 77.0000 kg 1,800.00 138,600.00 Pasir Pasang 0.1300 m3 118,200.00 15,366.00 Batu Kerikil 0.0200 m3 272,700.00 5,454.00 Besi beton 2.6000 kg 16,400.00 42,640.00 Pasir Beton 0.0900 m3 136,400.00 12,276.00 Jumlah Bahan 214,436.00 UPAH :Pekerja 1.4200 Oh 60,000.00 85,200.00 Tukang Batu 0.4730 Oh 75,000.00 35,475.00 Kepala Tukang 0.0470 Oh 95,000.00 4,465.00 Mandor 0.0710 Oh 100,000.00 7,100.00 Jumlah Pekerja 132,240.00

Jumlah Bahan + Pekerja 346,676.00 A.10.18 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (60X60) TINGGI 65 CM

BAHAN :Batu Bata 0.3710 m3 400.00 148.40 Semen Portland 114.0000 kg 1,800.00 205,200.00 Pasir Pasang 0.1840 m3 118,200.00 21,748.80 Batu Kerikil 0.0330 m3 272,700.00 8,999.10 Besi beton 4.8500 kg 14,500.00 70,325.00 Pasir Beton 0.1200 m3 136,400.00 16,368.00 Jumlah Bahan 322,789.30 UPAH :Pekerja 2.1600 Oh 60,000.00 129,600.00 Tukang Gali 0.1000 Oh 70,000.00 7,000.00 Tukang Batu 0.7200 Oh 75,000.00 54,000.00 Kepala Tukang 0.0720 Oh 95,000.00 6,840.00 Mandor 0.1080 Oh 100,000.00 10,800.00 Jumlah Pekerja 208,240.00

Jumlah Bahan + Pekerja 531,029.30

hrg badkip

Page 128: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 128+29

1 2 3 4 5 6 = ( 3 x 5 )A.10.19 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,5"

BAHAN :Pipa Galvanis 1.2000 m' 21,216.67 25,460.00 Perlengkapan 0.3500 hrg pipa 21,216.67 7,425.83 Jumlah Bahan 32,885.83 UPAH :Pekerja 0.0540 Oh 60,000.00 3,240.00 Tukang Batu 0.0900 Oh 75,000.00 6,750.00 Kepala Tukang 0.0090 Oh 95,000.00 855.00 Mandor 0.0270 Oh 100,000.00 2,700.00 Jumlah Pekerja 13,545.00

Jumlah Bahan + Pekerja 46,430.83 A.10.20 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,75"

BAHAN :Pipa Galvanis 1.2000 m' 25,850.00 31,020.00 Perlengkapan 0.3500 hrg pipa 25,850.00 9,047.50 Jumlah Bahan 40,067.50 UPAH :Pekerja 0.0540 Oh 60,000.00 3,240.00 Tukang Batu 0.0900 Oh 75,000.00 6,750.00 Kepala Tukang 0.0090 Oh 95,000.00 855.00 Mandor 0.0270 Oh 100,000.00 2,700.00 Jumlah Pekerja 13,545.00

Jumlah Bahan + Pekerja 53,612.50 A.10.21 MEMASANG 1 M' PIPA GALVANIS DIAMETER 1"

BAHAN :Pipa Galvanis 1.2000 1,2 m' 38,416.67 46,100.00 Perlengkapan 0.3500 hrg pipa 38,416.67 13,445.83 Jumlah Bahan 59,545.83 UPAH :Pekerja 0.0540 Oh 60,000.00 3,240.00 Tukang Batu 0.0900 Oh 75,000.00 6,750.00 Kepala Tukang 0.0090 Oh 95,000.00 855.00 Mandor 0.0270 Oh 100,000.00 2,700.00 Jumlah Pekerja 13,545.00

Jumlah Bahan + Pekerja 73,090.83 A.10.22 MEMASANG 1 M' PIPA GALVANIS DIAMETER 1,5"

BAHAN :Pipa Galvanis 1.2000 1,2 m' 59,450.00 71,340.00 Perlengkapan 0.3500 hrg pipa 59,450.00 20,807.50 Jumlah Bahan 92,147.50 UPAH :Pekerja 0.1080 Oh 60,000.00 6,480.00 Tukang Batu 0.1800 Oh 75,000.00 13,500.00 Kepala Tukang 0.0180 Oh 95,000.00 1,710.00 Mandor 0.0054 Oh 100,000.00 540.00 Jumlah Pekerja 22,230.00

Jumlah Bahan + Pekerja 114,377.50 A.10.23 MEMASANG 1 M' PIPA GALVANIS DIAMETER 3"

BAHAN :Pipa Galvanis 1.2000 1,2 m' 140,600.00 168,720.00 Perlengkapan 0.3500 hrg pipa 140,600.00 49,210.00 Jumlah Bahan 217,930.00 UPAH :Pekerja 0.1080 Oh 60,000.00 6,480.00 Tukang Batu 0.1800 Oh 75,000.00 13,500.00 Kepala Tukang 0.0180 Oh 95,000.00 1,710.00 Mandor 0.0054 Oh 100,000.00 540.00 Jumlah Pekerja 22,230.00

Jumlah Bahan + Pekerja 240,160.00 A.10.24 MEMASANG 1 M' PIPA GALVANIS DIAMETER 4"

BAHAN :Pipa Galvanis 1.2000 1,2 m' 185,300.00 222,360.00 Perlengkapan 0.3500 hrg pipa 185,300.00 64,855.00 Jumlah Bahan 287,215.00 UPAH :Pekerja 0.1350 Oh 60,000.00 8,100.00 Tukang Batu 0.2250 Oh 75,000.00 16,875.00 Kepala Tukang 0.0225 Oh 95,000.00 2,137.50 Mandor 0.0068 Oh 100,000.00 680.00 Jumlah Pekerja 27,792.50

Jumlah Bahan + Pekerja 315,007.50 A.10.25 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5"

BAHAN :

Page 129: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 129+29

1 2 3 4 5 6 = ( 3 x 5 )Pipa PVC 1.2000 m' 9,900.00 11,880.00 Perlengkapan 0.3500 hrg pipa 9,900.00 3,465.00 Jumlah Bahan 15,345.00 UPAH :Pekerja 0.0360 Oh 60,000.00 2,160.00 Tukang Batu 0.0600 Oh 75,000.00 4,500.00 Kepala Tukang 0.0060 Oh 95,000.00 570.00 Mandor 0.0018 Oh 100,000.00 180.00 Jumlah Pekerja 7,410.00

Jumlah Bahan + Pekerja 22,755.00 A.10.26 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,75"

BAHAN :Pipa PVC 1.2000 m' 13,950.00 16,740.00 Perlengkapan 0.3500 hrg pipa 13,950.00 4,882.50 Jumlah Bahan 21,622.50 UPAH :Pekerja 0.0360 Oh 60,000.00 2,160.00 Tukang Batu 0.0600 Oh 75,000.00 4,500.00 Kepala Tukang 0.0060 Oh 95,000.00 570.00 Mandor 0.0018 Oh 100,000.00 180.00 Jumlah Pekerja 7,410.00

Jumlah Bahan + Pekerja 29,032.50 A.10.27 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1"

BAHAN :Pipa PVC 1.2000 m' 17,375.00 20,850.00 Perlengkapan 0.3500 hrg pipa 17,375.00 6,081.25 Jumlah Bahan 26,931.25 UPAH :Pekerja 0.0360 Oh 60,000.00 2,160.00 Tukang Batu 0.0600 Oh 75,000.00 4,500.00 Kepala Tukang 0.0060 Oh 95,000.00 570.00 Mandor 0.0018 Oh 100,000.00 180.00 Jumlah Pekerja 7,410.00

Jumlah Bahan + Pekerja 34,341.25 A.10.28 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1,5"

BAHAN :Pipa PVC 1.2000 m' 31,275.00 37,530.00 Perlengkapan 0.3500 hrg pipa 31,275.00 10,946.25 Jumlah Bahan 48,476.25 UPAH :Pekerja 0.0360 Oh 60,000.00 2,160.00 Tukang Batu 0.0600 Oh 75,000.00 4,500.00 Kepala Tukang 0.0060 Oh 95,000.00 570.00 Mandor 0.0018 Oh 100,000.00 180.00 Jumlah Pekerja 7,410.00

Jumlah Bahan + Pekerja 55,886.25 A.10.29 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2"

BAHAN :Pipa PVC 1.2000 m' 42,775.00 51,330.00 Perlengkapan 0.3500 hrg pipa 42,775.00 14,971.25 Jumlah Bahan 66,301.25 UPAH :Pekerja 0.0540 Oh 60,000.00 3,240.00 Tukang Batu 0.0900 Oh 75,000.00 6,750.00 Kepala Tukang 0.0090 Oh 95,000.00 855.00 Mandor 0.0027 Oh 100,000.00 270.00 Jumlah Pekerja 11,115.00

Jumlah Bahan + Pekerja 77,416.25 A.10.30 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2,5"

BAHAN :Pipa PVC 1.2000 m' 54,550.00 65,460.00 Perlengkapan 0.3500 hrg pipa 54,550.00 19,092.50 Jumlah Bahan 84,552.50 UPAH :Pekerja 0.0360 Oh 60,000.00 2,160.00 Tukang Batu 0.0600 Oh 75,000.00 4,500.00 Kepala Tukang 0.0060 Oh 95,000.00 570.00 Mandor 0.0018 Oh 100,000.00 180.00 Jumlah Pekerja 7,410.00

Jumlah Bahan + Pekerja 91,962.50 A.10.31 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3"

BAHAN :Pipa PVC 1.2000 m' 81,900.00 98,280.00 Perlengkapan 0.3500 hrg pipa 81,900.00 28,665.00

Page 130: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 130+29

1 2 3 4 5 6 = ( 3 x 5 ) Jumlah Bahan 126,945.00 UPAH :Pekerja 0.0810 Oh 60,000.00 4,860.00 Tukang Batu 0.1350 Oh 75,000.00 10,125.00 Kepala Tukang 0.0135 Oh 95,000.00 1,282.50 Mandor 0.0041 Oh 100,000.00 410.00 Jumlah Pekerja 16,677.50

Jumlah Bahan + Pekerja 143,622.50 A.10.32 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4"

BAHAN :Pipa PVC 1.2000 m' 127,150.00 152,580.00 Perlengkapan 0.3500 hrg pipa 127,150.00 44,502.50 Jumlah Bahan 197,082.50 UPAH :Pekerja 0.0810 Oh 60,000.00 4,860.00 Tukang Batu 0.1350 Oh 75,000.00 10,125.00 Kepala Tukang 0.0135 Oh 95,000.00 1,282.50 Mandor 0.0041 Oh 100,000.00 410.00 Jumlah Pekerja 16,677.50

Jumlah Bahan + Pekerja 213,760.00 A.10.33 MEMASANG 1 BH BAK CUCI PIRING STAILES STEEL

BAHAN :Bak Cuci Stainless Steel 1.0000 bh 290,900.00 290,900.00 Water drain + asesories 1.0000 bh 36,400.00 36,400.00 Jumlah Bahan 327,300.00 UPAH :Pekerja 0.0300 Oh 60,000.00 1,800.00 Tukang Batu 0.3000 Oh 75,000.00 22,500.00 Kepala Tukang 0.0300 Oh 95,000.00 2,850.00 Mandor 0.0015 Oh 100,000.00 150.00 Jumlah Pekerja 27,300.00

Jumlah Bahan + Pekerja 354,600.00 A.10.35 MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5"

BAHAN :Kran Air 1.0000 bh 37,100.00 37,100.00 Seal tape 0.0250 bh 2,400.00 60.00 Jumlah Bahan 37,160.00 UPAH :Pekerja 0.0100 Oh 60,000.00 600.00 Tukang Batu - Oh 75,000.00 - Kepala Tukang 0.0010 Oh 95,000.00 95.00 Mandor 0.0005 Oh 100,000.00 50.00 Jumlah Pekerja 745.00

Jumlah Bahan + Pekerja 37,905.00 A.10.36 MEMASANG 1 BH FLOOR DRAIN

BAHAN :Floordrain 1.0000 bh 36,400.00 36,400.00

Jumlah Bahan 36,400.00 UPAH :Pekerja 0.0100 Oh 60,000.00 600.00 Tukang Batu - Oh 75,000.00 - Kepala Tukang 0.0010 Oh 95,000.00 95.00 Mandor 0.0005 Oh 100,000.00 50.00 Jumlah Pekerja 745.00

Jumlah Bahan + Pekerja 37,145.00 A.10.37 1 UNIT SEPTICTANK 2,5 X 1,5 X 2M + REMBESANNYA ( KANTOR TYPE BESAR )

Galian tanah 7.5000 m³ 36,760.00 275,700.00 Pasir urug 0.3570 m³ 139,000.00 49,623.00 Lantai kerja 3.7500 m³ 828,702.00 3,107,632.50 Pas. bata 1 PC : 2 PS + Plesteran 25.0000 m² 134,336.40 3,358,410.00 Plat beton penutup & balok 0.5000 m³ 5,003,248.00 2,501,624.00 Pipa PVC 4" jenis AW + sambungan 9.0000 m1 62,050.00 558,450.00 Pipa GIP 1/2" 2.0000 m1 21,216.67 42,433.33 Galian tanah untuk rembesan 5.6250 m³ 36,760.00 206,775.00 Pas. injuk 9.0000 kg 36,660.00 329,940.00 Urugan kerikil 3,5 cm 1.7500 m³ 263,600.00 461,300.00 Pipa PVC 4" berlobang jenis AW 6.0000 m1 48,400.00 290,400.00 Urugan kembali perataan tanah 1.8750 m³ 13,420.00 25,162.50 Jumlah 11,207,450.33

A.10.38 1 UNIT SEPTICTANK 2 X 1,5 X 1,5 M + REMBESANNYA ( KANTOR TYPE KECIL )Galian tanah 4.5000 m³ 36,760.00 165,420.00 Pasir urug 0.2142 m³ 139,000.00 29,773.80 Lantai kerja 2.2500 m³ 828,702.00 1,864,579.50

Page 131: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 131+29

1 2 3 4 5 6 = ( 3 x 5 )Pas. bata 1 PC : 2 PS + Plesteran 15.0000 m² 134,336.40 2,015,046.00 Plat beton penutup & balok 0.3000 m³ 5,003,248.00 1,500,974.40 Pipa PVC 4" jenis AW + sambungan 5.4000 m1 62,050.00 335,070.00 Pipa GIP 1/2" 1.2000 btg 21,216.67 25,460.00 Galian tanah untuk rembesan 3.3750 m³ 36,760.00 124,065.00 Pas. injuk 5.4000 kg 36,660.00 197,964.00 Urugan kerikil 3,5 cm 1.0500 m³ 263,600.00 276,780.00 Pipa PVC 4" berlobang jenis AW 9.0000 m1 48,400.00 435,600.00 Urugan kembali perataan tanah 1.1250 m³ 13,420.00 15,097.50 Jumlah 6,985,830.20

Page 132: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 132+29

1 2 3 4 5 6 = ( 3 x 5 )A.10.39 1 UNIT SEPTICTANK 1.5 X 1 X 1,5 M + REMBESANNYA ( RUMAH KAPASITAS KECIL)

Galian tanah 2.2500 m³ 36,760.00 82,710.00 Pasir urug 0.1071 m³ 139,000.00 14,886.90 Lantai kerja 1.1250 m³ 828,702.00 932,289.75 Pas. bata 1 PC : 2 PS + Plesteran 7.5000 m² 134,336.40 1,007,523.00 Plat beton penutup & balok 0.1500 m³ 5,003,248.00 750,487.20 Pipa PVC 4" jenis AW + sambungan 9.0000 m1 62,050.00 558,450.00 Pipa GIP1/2" 0.6000 btg 21,216.67 12,730.00 Galian tanah untuk rembesan 1.6875 m³ 36,760.00 62,032.50 Pas. injuk 2.7000 kg 36,660.00 98,982.00 Urugan kerikil 3,5 cm 0.5250 m³ 263,600.00 138,390.00 Pipa PVC 4" berlobang jenis AW 9.0000 m1 48,400.00 435,600.00 Urugan kembali perataan tanah 0.5625 m³ 13,420.00 7,548.75 Jumlah 4,101,630.10

A.10.40 1 M1 SALURAN GREFEL BETON 1/2 Q 20 CM + PASANGANGalian Tanah 0.1500 m³ 28,000.00 4,200.00 Grefel Beton 20 Cm X 1/2 1.0000 bh 36,400.00 36,400.00 Pas . Bata + Plesteran 1 : 3 1.0000 m1 126,328.80 126,328.80 Jumlah Bahan 166,928.80 UPAH :Upah kerja 0.1500 ls 166,928.80 25,039.32 Jumlah Pekerja 25,039.32

Jumlah Bahan + Pekerja 191,968.12 A.10.41 1 M1 SALURAN GREFEL BETON 1/2 Q 30 CM + PASANGAN

Galian Tanah 0.2000 m³ 28,000.00 5,600.00 Grefel Beton 30 Cm X 1/2 1.0000 bh 54,500.00 54,500.00 Pas . Bata + Plesteran 1 : 3 1.0000 m1 126,328.80 126,328.80 Jumlah Bahan 186,428.80 UPAH :Upah Kerja 0.1500 ls 186,428.80 27,964.32 Jumlah Pekerja 27,964.32

Jumlah Bahan + Pekerja 214,393.12 A.11.01 1 KG PASANG RANGKA ATAP BAJA

BAHAN :Besi Profil WF 1.1000 kg 16,800.00 18,480.00 Meni Besi 0.0800 kg 28,400.00 2,272.00 Jumlah Bahan 20,752.00 UPAH :Pekerja 0.0600 Oh 60,000.00 3,600.00 Tukang Besi 0.0060 Oh 75,000.00 450.00 Kepala Tukang 0.0060 Oh 95,000.00 570.00 Mandor 0.0003 Oh 100,000.00 30.00 Jumlah Pekerja 4,650.00

Jumlah Bahan + Pekerja 25,402.00 A.11.08 1 M2 PASANG ROLLING DOOR

BAHAN :Roll Door 1.0000 m2 727,300.00 727,300.00 Jumlah Bahan 727,300.00 UPAH :Pekerja 1.0500 Oh 60,000.00 63,000.00 Tukang Besi Konstruksi 1.5000 Oh 75,000.00 112,500.00 Kepala Tukang 0.1050 Oh 95,000.00 9,975.00 Mandor 0.0052 Oh 100,000.00 520.00 Jumlah Pekerja 185,995.00

Jumlah Bahan + Pekerja 913,295.00

Page 133: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 133+29

1 2 3 4 5 6 = ( 3 x 5 )A.11.09 1 M2 PASANG PINTU ALUMINIUM

BAHAN :Pintu Alluminium 1.0000 m2 272,700.00 272,700.00 Jumlah Bahan 272,700.00 UPAH :Pekerja 1.0500 Oh 60,000.00 63,000.00 Tukang Besi Konstruksi 1.0500 Oh 75,000.00 78,750.00 Kepala Tukang 0.1050 Oh 95,000.00 9,975.00 Mandor 0.0052 Oh 100,000.00 520.00 Jumlah Pekerja 152,245.00

Jumlah Bahan + Pekerja 424,945.00 Keuntungan Max. 10 % 42,494.50 Jumlah Total 467,439.50 Dibulatkan 467,430.00

A.11.12 1 M2 PASANG TERALIS BESIBAHAN :Besi Strip 2x3 1.0000 m2 145,500.00 145,500.00 Jumlah Bahan 145,500.00 UPAH :Pekerja 1.2000 Oh 60,000.00 72,000.00 Tukang Kayu 1.2000 Oh 75,000.00 90,000.00 Kepala Tukang 0.0120 Oh 95,000.00 1,140.00 Mandor 0.00060 Oh 100,000.00 60.00 Jumlah Pekerja 163,200.00

Jumlah Bahan + Pekerja 308,700.00 A.11.17 1 M2 PASANG JENDELA NAKO DAN TRALIS

BAHAN :Jendela Nako 1.1000 m2 13,650.00 15,015.00 Paku Biasa 1/2"-1" atau skrup 0.0200 kg 16,400.00 328.00 Besi Strip 2x3 0.0250 m2 14,900.00 372.50 Jumlah Bahan 15,715.50 UPAH :Pekerja 0.2000 Oh 60,000.00 12,000.00 Tukang Kayu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.00100 Oh 100,000.00 100.00 Jumlah Pekerja 29,000.00

Jumlah Bahan + Pekerja 44,715.50 A.11.18 1 M2 PASANG TALANG DATAR, SENG BJLS 28

BAHAN :Seng Plat 3 x 6 bjls 28 0.5000 lbr 39,700.00 19,850.00 Paku Biasa 1/2"-1" 0.0150 kg 16,400.00 246.00 Kayu KAYU LOKAL KLS II, papan 0.0096 m3 6,381,800.00 61,265.28 Flincote/Meni Besi 0.2500 kg 28,400.00 7,100.00 Jumlah Bahan 88,461.28 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.4000 Oh 75,000.00 30,000.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.00125 Oh 100,000.00 125.00 Jumlah Pekerja 41,500.00

Jumlah Bahan + Pekerja 129,961.28

Page 134: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 134+29

1 2 3 4 5 6 = ( 3 x 5 )A.11.19 1 M2 PASANG TALANG MIRING, SENG BJLS 28

BAHAN :Seng Plat 3 x 6 bjls 28 0.5000 lbr 39,700.00 19,850.00 Paku Biasa 1/2"-1" 0.0150 kg 16,400.00 246.00 Kayu KAYU LOKAL KLS II, papan 0.0190 m3 6,381,800.00 121,254.20 Flincote/Meni Besi 0.3000 kg 28,400.00 8,520.00 Jumlah Bahan 149,870.20 UPAH :Pekerja 0.0400 Oh 60,000.00 2,400.00 Tukang Kayu 0.4000 Oh 75,000.00 30,000.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.00125 Oh 100,000.00 125.00 Jumlah Pekerja 34,900.00

Jumlah Bahan + Pekerja 184,770.20 A.11.20 1 M2 PASANG TALANG 1/2 LINGKARAN D-10 CM, SENG BJLS 28

BAHAN :Seng Plat 3 x 6 bjls 28 0.3000 lbr 39,700.00 11,910.00 Paku Biasa 1/2"-1" 0.1000 kg 16,400.00 1,640.00 Kayu KAYU LOKAL KLS II, papan 0.0190 m3 6,381,800.00 121,254.20 Besi Strip 0.5000 kg 17,300.00 8,650.00 Jumlah Bahan 143,454.20 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.00125 Oh 100,000.00 125.00 Jumlah Pekerja 30,250.00

Jumlah Bahan + Pekerja 173,704.20 A.11.21 1 M2 PASANG TALANG 1/2 LINGKARAN D-10 CM, SENG BJLS 24

BAHAN :Seng Plat 3 x 6 bjls 24 0.3000 lbr 39,700.00 11,910.00 Paku Biasa 1/2"-1" 0.1000 kg 16,400.00 1,640.00 Kayu KAYU LOKAL KLS II, papan 0.0190 m3 6,381,800.00 121,254.20 Besi Strip 0.5000 kg 17,300.00 8,650.00 Jumlah Bahan 143,454.20 UPAH :Pekerja 0.1500 Oh 60,000.00 9,000.00 Tukang Kayu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.00125 Oh 100,000.00 125.00 Jumlah Pekerja 30,250.00

Jumlah Bahan + Pekerja 173,704.20 A.12.02 1 BUAH PASANG KUNCI TANAM BIASA

BAHAN :Kunci Tanam biasa 1.0000 bh 87,350.00 87,350.00 Jumlah Bahan 87,350.00 UPAH :Pekerja 0.0100 Oh 60,000.00 600.00 Tukang Kayu 0.5000 Oh 75,000.00 37,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.0050 Oh 100,000.00 500.00 Jumlah Pekerja 39,550.00

Jumlah Bahan + Pekerja 126,900.00

Page 135: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 135+29

1 2 3 4 5 6 = ( 3 x 5 )A.12.03 1 BUAH PASANG KUNCI TANAM KAMAR MANDI

BAHAN :Kunci Tanam Kamar Mandi 1.0000 bh 40,950.00 40,950.00 Jumlah Bahan 40,950.00 UPAH :Pekerja 0.0050 Oh 60,000.00 300.00 Tukang Kayu 0.5000 Oh 75,000.00 37,500.00 Kepala Tukang 0.0050 Oh 95,000.00 475.00 Mandor 0.0025 Oh 100,000.00 250.00 Jumlah Pekerja 38,525.00

Jumlah Bahan + Pekerja 79,475.00 A.12.04 1 BUAH PASANG KUNCI SILINDER

BAHAN :Kunci Silinder 1.0000 bh 204,750.00 204,750.00 Jumlah Bahan 204,750.00 UPAH :Pekerja 0.0050 Oh 60,000.00 300.00 Tukang Kayu 0.5000 Oh 75,000.00 37,500.00 Kepala Tukang 0.0050 Oh 95,000.00 475.00 Mandor 0.00025 Oh 100,000.00 25.00 Jumlah Pekerja 38,300.00

Jumlah Bahan + Pekerja 243,050.00 A.12.05 1 BUAH PASANG ENGSEL PINTU

BAHAN :Engsel pIntu 1.0000 bh 12,200.00 12,200.00 Jumlah Bahan 12,200.00 UPAH :Pekerja 0.0150 Oh 60,000.00 900.00 Tukang Kayu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.00075 Oh 100,000.00 75.00 Jumlah Pekerja 9,900.00

Jumlah Bahan + Pekerja 22,100.00 A.12.06 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU

BAHAN :Engsel Jendela 1.0000 bh 7,400.00 7,400.00 Jumlah Bahan 7,400.00 UPAH :Pekerja 0.0100 Oh 60,000.00 600.00 Tukang Kayu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0100 Oh 95,000.00 950.00 Mandor 0.00050 Oh 100,000.00 50.00 Jumlah Pekerja 9,100.00

Jumlah Bahan + Pekerja 16,500.00 A.12.09 1 BUAH PASANG KAIT ANGIN

BAHAN :Kait Angin 1.0000 ps 6,750.00 6,750.00 Jumlah Bahan 6,750.00 UPAH :Pekerja 0.0150 Oh 60,000.00 900.00 Tukang Kayu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.00075 Oh 100,000.00 75.00 Jumlah Pekerja 13,650.00

Jumlah Bahan + Pekerja 20,400.00 Keuntungan Max. 10 % 2,040.00 Jumlah Total 22,440.00 Dibulatkan 22,440.00

Page 136: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 136+29

1 2 3 4 5 6 = ( 3 x 5 )A.12.10 1 BUAH PASANG DOOR CLOSER

BAHAN :Door Closer 1.0000 bh 129,600.00 129,600.00 Jumlah Bahan 129,600.00 UPAH :Pekerja 0.0500 Oh 60,000.00 3,000.00 Tukang Kayu 0.5000 Oh 75,000.00 37,500.00 Kepala Tukang 0.0500 Oh 95,000.00 4,750.00 Mandor 0.00250 Oh 100,000.00 250.00 Jumlah Pekerja 45,500.00

Jumlah Bahan + Pekerja 175,100.00 A.12.11 1 BUAH PASANG KUNCI SELOT

BAHAN :Kunci Selot 1.0000 bh 6,750.00 6,750.00 Jumlah Bahan 6,750.00 UPAH :Pekerja 0.0200 Oh 60,000.00 1,200.00 Tukang Kayu 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0200 Oh 95,000.00 1,900.00 Mandor 0.00100 Oh 100,000.00 100.00 Jumlah Pekerja 18,200.00

Jumlah Bahan + Pekerja 24,950.00 A.12.12 1 BUAH PASANG PEGANGAN PINTU / DOOR HOLDER

BAHAN :Door Holder 1.0000 bh 23,000.00 23,000.00 Jumlah Bahan 23,000.00 UPAH :Pekerja 0.0500 Oh 60,000.00 3,000.00 Tukang Kayu 0.5000 Oh 75,000.00 37,500.00 Kepala Tukang 0.0500 Oh 95,000.00 4,750.00 Mandor 0.00250 Oh 100,000.00 250.00 Jumlah Pekerja 45,500.00

Jumlah Bahan + Pekerja 68,500.00 A.12.14 1 BUAH PASANG REL PINTU DORONG

BAHAN :Rel Pintu Dorong 1.0000 bh 64,800.00 64,800.00 Jumlah Bahan 64,800.00 UPAH :Pekerja 0.0600 Oh 60,000.00 3,600.00 Tukang Kayu 0.6000 Oh 75,000.00 45,000.00 Kepala Tukang 0.0600 Oh 95,000.00 5,700.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 54,600.00

Jumlah Bahan + Pekerja 119,400.00 A.12.16 1 M2 PASANG KACA, TEBAL 3 MM

BAHAN :Kaca 1.1000 m2 61,800.00 67,980.00 Jumlah Bahan 67,980.00 UPAH :Pekerja 0.0150 Oh 60,000.00 900.00 Tukang Kayu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.00075 Oh 100,000.00 75.00 Jumlah Pekerja 13,650.00

Jumlah Bahan + Pekerja 81,630.00

Page 137: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 137+29

1 2 3 4 5 6 = ( 3 x 5 )A.12.17 1 M2 PASANG KACA, TEBAL 5 MM

BAHAN :Kaca 1.1000 m2 69,100.00 76,010.00 Jumlah Bahan 76,010.00 UPAH :Pekerja 0.0150 Oh 60,000.00 900.00 Tukang Kayu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.00075 Oh 100,000.00 75.00 Jumlah Pekerja 13,650.00

Jumlah Bahan + Pekerja 89,660.00 A.12.18 1 M2 PASANG KACA, TEBAL 8 MM

BAHAN :Kaca 1.1000 m2 120,000.00 132,000.00 Jumlah Bahan 132,000.00 UPAH :Pekerja 0.0165 Oh 60,000.00 990.00 Tukang Kayu 0.1650 Oh 75,000.00 12,375.00 Kepala Tukang 0.0165 Oh 95,000.00 1,567.50 Mandor 0.00080 Oh 100,000.00 80.00 Jumlah Pekerja 15,012.50

Jumlah Bahan + Pekerja 147,012.50 A.12.19 1 M2 PASANG KACA BURAM, TEBAL 12 MM

BAHAN :Kaca Buram 1.1000 m2 496,400.00 546,040.00 Sealent 0.0500 kg - Jumlah Bahan 546,040.00 UPAH :Pekerja 0.0250 Oh 60,000.00 1,500.00 Tukang Kayu 0.2500 Oh 75,000.00 18,750.00 Kepala Tukang 0.0250 Oh 95,000.00 2,375.00 Mandor 0.00125 Oh 100,000.00 125.00 Jumlah Pekerja 22,750.00

Jumlah Bahan + Pekerja 568,790.00 A.12.24 1 M2 PASANG KACA PATRI, TEBAL 5 MM

BAHAN :Kaca Patri 1.1000 m2 69,100.00 76,010.00 Jumlah Bahan 76,010.00 UPAH :Pekerja 0.0150 Oh 60,000.00 900.00 Tukang Kayu 0.1500 Oh 75,000.00 11,250.00 Kepala Tukang 0.0150 Oh 95,000.00 1,425.00 Mandor 0.00075 Oh 100,000.00 75.00 Jumlah Pekerja 13,650.00

Jumlah Bahan + Pekerja 89,660.00 A.12.25 1 KG PEK. ERECTION KONST KUDA-KUDA BESI

Pekerja terampil 0.0010 org 70,000.00 70.00 Tukang besi profil terampil 0.0010 org 90,000.00 90.00 Kepala tukang besi profil 0.0002 org 95,000.00 19.00 Mandor 0.0001 org 100,000.00 10.00 Operator alat besar 0.0002 org 90,000.00 18.00 Pembantu operator 0.0200 org 60,000.00 1,200.00 Sewa alat ( Las Listrik + Tuckle ) 0.0002 ls 28,750.00 5.75 Bahan bakar solar 0.0100 lt 8,500.00 85.00 Pelumas 0.0010 lt 36,600.00 36.60 Alat bantu 0.0002 lot 1,534.35 0.31 Jumlah 1,534.66

Page 138: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 138+29

1 2 3 4 5 6 = ( 3 x 5 )A.12.26 1 KG PEKERJAAN BAJA IWF EX DN

Besi IWF ex DN SII 1.0500 kg 16,800.00 17,640.00

Jumlah Bahan 17,640.00 UPAH :Pekerja Terampil 0.0600 org 70,000.00 4,200.00 Tukang besi profil terampil 0.0040 org 90,000.00 360.00 Kepala tukang besi profil 0.0010 org 95,000.00 95.00 Mandor 0.0002 org 100,000.00 20.00 Peralatan ( Alat las, dll) 0.1250 lot 22,315.00 2,789.38 Jumlah Pekerja 7,464.38

Jumlah Bahan + Pekerja 25,104.38 A.12.27 1 KG PEKERJAAN BAJA EX JAPAN

Besi IWF ex Japan 1.0500 kg 19,800.00 20,790.00

Jumlah Bahan 20,790.00 UPAH :Pekerja Terampil 0.0600 org 70,000.00 4,200.00 Tukang besi profil terampil 0.0040 org 90,000.00 360.00 Kepala tukang besi profil 0.0010 org 95,000.00 95.00 Mandor 0.0002 org 100,000.00 20.00 Peralatan ( Alat las, dll) 0.1250 lot 25,465.00 3,183.13 Jumlah Pekerja 7,858.13

Jumlah Bahan + Pekerja 28,648.13 Dibulatkan #REF!

A.12.28 1 KG PEK. KONSTRUKSI BESI SIKU / PROFIL EX. DNBesi profil / besi siku ex DN 1.0500 kg 19,800.00 20,790.00

Jumlah Bahan 20,790.00 UPAH :Pekerja Terampil 0.0600 org 70,000.00 4,200.00 Tukang besi profil terampil 0.0040 org 90,000.00 360.00 Kepala tukang besi profil 0.0010 org 95,000.00 95.00 Mandor 0.0002 org 100,000.00 20.00 Peralatan ( Alat las, dll) 0.1250 lot 25,465.00 3,183.13 Jumlah Pekerja 7,858.13

Jumlah Bahan + Pekerja 28,648.13 A.12.29 1 Titik PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL = KAWAT 4 MM

Kawat las listrik 0.0400 kg 37,100.00 1,484.00 Bahan bakar solar 0.0300 lt 8,500.00 255.00 Pelumas 0.0040 lt 36,600.00 146.40 Jumlah Bahan 1,885.40 UPAH :Pekerja Terampil 0.0040 org 70,000.00 280.00 Tukang besi profil terampil 0.0020 org 90,000.00 180.00 Kepala tukang besi profil 0.0020 org 95,000.00 190.00 Mandor 0.0010 org 100,000.00 100.00 Alat bantu ( Mesin Las Listrik) 0.2500 lot 2,635.40 658.85 Jumlah Pekerja 1,408.85

Jumlah Bahan + Pekerja 3,294.25 A.12.30 1 TITIK MELOBANG KONSTRUKSI BESI DENGAN BOR

Pekerja Terampil 0.0500 org 70,000.00 3,500.00 Tukang besi profil terampil 0.0200 org 90,000.00 1,800.00 Kepala tukang besi profil 0.0030 org 95,000.00 285.00 Mandor 0.0010 org 100,000.00 100.00 Alat bantu ( Mesin Bor Listrik ) 0.2500 lot 5,685.00 1,421.25 Jumlah 7,106.25

Page 139: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 139+29

1 2 3 4 5 6 = ( 3 x 5 )A.12.31 1 M2 PEKERJAAN BONDEX

Bondek 1.0100 m² 200,900.00 202,909.00 Kawat las 0.1000 kg 37,100.00 3,710.00

Jumlah Bahan 206,619.00 UPAH :Pekerja terampil 0.0500 org 70,000.00 3,500.00 Tukang besi profil setengah trampil 0.0300 org 75,000.00 2,250.00 Mandor 0.0100 org 100,000.00 1,000.00 Shear Connector 1.0000 ls 16,499.00 16,499.00 Jumlah Pekerja 23,249.00

Jumlah Bahan + Pekerja 229,868.00 A.12.32 1 M2 PEKERJAAN WIREMESH M8

Wiremesh M8 1.0100 m² 56,700.00 57,267.00 Kawat las 0.1000 kg 37,100.00 3,710.00

Jumlah Bahan 60,977.00 UPAH :Pekerja terampil 0.1000 org 70,000.00 7,000.00 Tukang besi profil setengah trampil 0.0750 org 75,000.00 5,625.00 Mandor 0.0100 org 100,000.00 1,000.00 Jumlah Pekerja 13,625.00

Jumlah Bahan + Pekerja 74,602.00 A.12.33 1 M1 PEK.PAGAR DEPAN TRALIS STANDARD

Galian Tanah 0.4500 m³ 28,000.00 12,600.00 Urugan Pasir 10 cm' 0.0800 m³ 139,000.00 11,120.00 Pasang Aanstamping 0.1200 m³ 297,155.00 35,658.60 Pas.Batu Belah 1 pc : 4 psr 0.2000 m³ 669,014.00 133,802.80 Plesteran & Acian 1 pc : 4 psr 0.4100 m² 37,399.00 15,333.59 Beton Tulang ( 100 kg/m3 ) 0.0563 m³ #REF! #REF!Pagar Tralis 1.5000 m' 818,200.00 1,227,300.00 Pengecatan 1.0000 m² 50,177.80 50,177.80 Jumlah #REF!

A.12.34 1 M1 PEK. PAGAR BELAKANG / SAMPINGGalian Tanah 0.4500 m³ 28,000.00 12,600.00 Urugan Pasir 10 cm' 0.0800 m³ 139,000.00 11,120.00 Pasang Aanstamping 0.1200 m³ 297,155.00 35,658.60 Pas.Batu Belah 1 pc : 4 psr 0.2000 m³ 669,014.00 133,802.80 Pas.bata + plesteran 1 : 4 1.8000 m² 155,768.48 280,383.27 Beton Tulang ( 100 kg/m3 ) 0.0563 m³ #REF! #REF!Besi Siku 1.0000 kg 16,300.00 16,300.00 Kawat Duri 3.0000 m1 4,300.00 12,900.00 Pengecatan 1.0000 m² 24,985.00 24,985.00 Jumlah #REF! Keuntungan Max. 10 % #REF! Jumlah #REF! Dibulatkan #REF!

A.13.02 1 M2 PASANG LANTAI TEGEL BADAK ABU-ABU UKURAN 30X30 CMBAHAN :Tegel Badak Abu-abu 30x30 cm 11.8700 bh 4,300.00 51,041.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0215 m3 118,200.00 2,541.30 Jumlah Bahan 68,702.30 UPAH :Pekerja 0.2600 Oh 60,000.00 15,600.00 Tukang Batu 0.1250 Oh 75,000.00 9,375.00 Kepala Tukang 0.0125 Oh 95,000.00 1,187.50 Mandor 0.00130 Oh 100,000.00 130.00 Jumlah Pekerja 26,292.50

Jumlah Bahan + Pekerja 94,994.80

Page 140: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 140+29

1 2 3 4 5 6 = ( 3 x 5 )A.13.09 1 M2 PASANG LANTAI UBIN GRANITO UKURAN 40X40 CM

BAHAN :Ubin Granito 40x40 cm 6.9300 bh 75,209.24 521,200.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0215 m3 118,200.00 2,541.30 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 543,411.30 UPAH :Pekerja 0.2500 Oh 60,000.00 15,000.00 Tukang Batu 0.1200 Oh 75,000.00 9,000.00 Kepala Tukang 0.0120 Oh 95,000.00 1,140.00 Mandor 0.00125 Oh 100,000.00 125.00 Jumlah Pekerja 25,265.00

Jumlah Bahan + Pekerja 568,676.30 A.13.42 1 M2 PASANG LANTAI KERAMIK 10 X 20 CM

BAHAN :Ubin Keramik 10 x 20 cm 50.0000 bh 1,636.00 81,800.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 106,434.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 173,509.40 A.13.44 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM

BAHAN :Ubin Keramik 20 x 20 cm 25.0000 bh 3,272.00 81,800.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 106,434.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 173,509.40 A.13.45 1 M2 PASANG LANTAI KERAMIK 25 X 25 CM

BAHAN :Ubin Keramik 25 x 25 cm 16.0000 bh 4,887.50 78,200.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 102,834.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 169,909.40

Page 141: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 141+29

1 2 3 4 5 6 = ( 3 x 5 )A.13.46 1 M2 PASANG LANTAI KERAMIK 15 X 20 CM

BAHAN :Ubin Keramik 15 x 20 cm 35.0000 bh 2,337.14 81,800.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 106,434.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 173,509.40 A.13.47 1 M2 PASANG LANTAI KERAMIK 33 X 33 CM

BAHAN :Ubin Keramik 33 x 33 cm 10.0000 bh 10,000.00 100,000.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 124,634.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 191,709.40 A.13.48 1 M2 PASANG LANTAI KERAMIK 33 X 33 CM ANTISLIP

BAHAN :Ubin Keramik 33 x 33 cm Antislip 10.0000 bh 10,910.00 109,100.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 133,734.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 200,809.40 A.13.49 1 M2 PASANG LANTAI KERAMIK 10 X 33 CM

BAHAN :Ubin Keramik 10 x 33 cm 33.0000 bh 3,030.30 100,000.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 124,634.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 191,709.40

Page 142: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 142+29

1 2 3 4 5 6 = ( 3 x 5 )A.13.51 1 M2 PASANG LANTAI MARMER

BAHAN :Marmer 1.0520 bh 328,700.00 345,792.40 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0390 m3 118,200.00 4,609.80 Semen Warna 2.0000 kg 9,100.00 18,200.00 Jumlah Bahan 383,722.20 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.03000 Oh 100,000.00 3,000.00 Jumlah Pekerja 69,775.00

Jumlah Bahan + Pekerja 453,497.20 A.13.56 1 M2 PASANG LANTAI PARQUET JATI

BAHAN :Parquet Jati 1.0500 m2 581,800.00 610,890.00 Lem Vinyl 0.6000 kg 23,600.00 14,160.00 Jumlah Bahan 625,050.00 UPAH :Pekerja 0.6500 Oh 60,000.00 39,000.00 Tukang 0.3500 Oh 90,000.00 31,500.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.03250 Oh 100,000.00 3,250.00 Jumlah Pekerja 77,075.00

Jumlah Bahan + Pekerja 702,125.00 A.13.58 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, PUTIH

BAHAN :Porselen 11 x 11 cm 83.0000 bh 760.24 63,100.00 Semen Abu-abu 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0180 m3 118,200.00 2,127.60 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 84,897.60 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.5000 Oh 75,000.00 37,500.00 Kepala Tukang 0.0500 Oh 95,000.00 4,750.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 79,750.00

Jumlah Bahan + Pekerja 164,647.60 BAHAN :Porselen 11 x 11 cm, Warna 83.0000 bh 880.72 73,100.00 Semen Abu-abu 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0180 m3 118,200.00 2,127.60 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 94,897.60 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.5000 Oh 75,000.00 37,500.00 Kepala Tukang 0.0500 Oh 95,000.00 4,750.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 79,750.00

Jumlah Bahan + Pekerja 174,647.60

Page 143: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 143+29

1 2 3 4 5 6 = ( 3 x 5 )A.13.62 1 M2 PASANG DINDING PORSELEN 10 X 20 CM, WARNA

BAHAN :Porselen 10 x 20 cm, Warna 50.0000 bh 1,636.00 81,800.00 Semen Abu-abu 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0180 m3 118,200.00 2,127.60 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 103,597.60 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Batu 0.4500 Oh 75,000.00 33,750.00 Kepala Tukang 0.0450 Oh 95,000.00 4,275.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 74,325.00

Jumlah Bahan + Pekerja 177,922.60 A.13.63 1 M2 PASANG DINDING PORSELEN 20 X 20 CM, WARNA

BAHAN :Porselen 20 x 20 cm, Warna 25.0000 bh 3,272.00 81,800.00 Semen Abu-abu 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0180 m3 118,200.00 2,127.60 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 103,597.60 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Batu 0.4500 Oh 75,000.00 33,750.00 Kepala Tukang 0.0450 Oh 95,000.00 4,275.00 Mandor 0.03000 Oh 100,000.00 3,000.00 Jumlah Pekerja 77,025.00

Jumlah Bahan + Pekerja 180,622.60 A.13.66 1 M2 PASANG DINDING KERAMIK 10 X 20 CM,

BAHAN :Keramik 10 x 20 cm 50.0000 bh 1,636.00 81,800.00 Semen Abu-abu 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0180 m3 118,200.00 2,127.60 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 103,597.60 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Batu 0.4500 Oh 75,000.00 33,750.00 Kepala Tukang 0.0450 Oh 95,000.00 4,275.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 74,325.00

Jumlah Bahan + Pekerja 177,922.60 A.13.68 1 M2 PASANG DINDING KERAMIK 20 X 20 CM,

BAHAN :Keramik 20 x 20 cm 25.0000 bh 3,272.00 81,800.00 Semen Abu-abu 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0180 m3 118,200.00 2,127.60 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 103,597.60 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Batu 0.1000 Oh 75,000.00 7,500.00 Kepala Tukang 0.0450 Oh 95,000.00 4,275.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 48,075.00

Jumlah Bahan + Pekerja 151,672.60

Page 144: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 144+29

1 2 3 4 5 6 = ( 3 x 5 )A.13.69 1 M2 PASANG DINDING KERAMIK 10 X 20 CM,

BAHAN :Keramik 10 x 20 cm 50.0000 bh 1,636.00 81,800.00 Semen Abu-abu 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0180 m3 118,200.00 2,127.60 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 103,597.60 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Batu 0.1250 Oh 75,000.00 9,375.00 Kepala Tukang 0.0125 Oh 95,000.00 1,187.50 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 46,862.50

Jumlah Bahan + Pekerja 150,460.10 A.13.70 1 M2 PASANG DINDING MARMER

BAHAN :Marmer 1.0200 m2 328,700.00 335,274.00 Paku Cacing 2.0000 bh 22,700.00 45,400.00 Semen Abu-abu 12.4400 kg 1,800.00 22,392.00 Pasir Pasang 0.0250 m3 118,200.00 2,955.00 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 410,571.00 UPAH :Pekerja 0.7200 Oh 60,000.00 43,200.00 Tukang Batu 0.6500 Oh 75,000.00 48,750.00 Kepala Tukang 0.0650 Oh 95,000.00 6,175.00 Mandor 0.0035 Oh 100,000.00 350.00 Jumlah Pekerja 98,475.00

Jumlah Bahan + Pekerja 509,046.00 A.13.74 1 M2 PASANG DINDING BATU TEMPEL

BAHAN :Batu Tempel Hitam 1.0500 m2 212,700.00 223,335.00 Semen Abu-abu 11.7500 kg 1,800.00 21,150.00 Pasir Pasang 0.0350 m3 118,200.00 4,137.00 Jumlah Bahan 248,622.00 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.0030 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 315,697.00 A.13.75 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM DN PUTIH POLOS

BAHAN :Ubin Keramik 30 x 30 cm 12.0000 bh 6,208.33 74,500.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 99,134.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 166,209.40

Page 145: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 145+29

1 2 3 4 5 6 = ( 3 x 5 )A.13.76 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM WARNA / CORAK / ANTI SLIP

BAHAN :Ubin Keramik 30 x 30 cm Warna/Corak/Anti Slip 12.0000 bh 7,191.67 86,300.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 110,934.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 178,009.40 A.13.77 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM

BAHAN :Ubin Keramik 40 x 40 cm 12.0000 bh 8,275.00 99,300.00 Semen Portland 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0420 m3 118,200.00 4,964.40 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 123,934.40 UPAH :Pekerja 0.6200 Oh 60,000.00 37,200.00 Tukang Batu 0.3500 Oh 75,000.00 26,250.00 Kepala Tukang 0.0350 Oh 95,000.00 3,325.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 67,075.00

Jumlah Bahan + Pekerja 191,009.40 A.13.78 1 M2 PASANG DINDING KERAMIK 20 X 25 CM,

BAHAN :Keramik 20 x 25 cm 20.0000 bh 3,910.00 78,200.00 Semen Abu-abu 8.4000 kg 1,800.00 15,120.00 Pasir Pasang 0.0180 m3 118,200.00 2,127.60 Semen Warna 0.5000 kg 9,100.00 4,550.00 Jumlah Bahan 99,997.60 UPAH :Pekerja 0.6000 Oh 60,000.00 36,000.00 Tukang Batu 0.4500 Oh 75,000.00 33,750.00 Kepala Tukang 0.0450 Oh 95,000.00 4,275.00 Mandor 0.00300 Oh 100,000.00 300.00 Jumlah Pekerja 74,325.00

Jumlah Bahan + Pekerja 174,322.60 A.13.82 1 M2 PASANG PLINT KAYU 2 X 10 CM

BAHAN :Kayu Jati Papan 0.0024 m3 14,227,300.00 34,145.52 Paku Skrup 3-5 0.0500 kg 12,300.00 615.00 Jumlah Bahan 34,760.52 UPAH :Pekerja 0.1200 Oh 60,000.00 7,200.00 Tukang Kayu 0.1200 Oh 75,000.00 9,000.00 Kepala Tukang 0.0120 Oh 95,000.00 1,140.00 Mandor 0.0060 Oh 100,000.00 600.00 Jumlah Pekerja 17,940.00

Jumlah Bahan + Pekerja 52,700.52

Page 146: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 146+29

1 2 3 4 5 6 = ( 3 x 5 )A.13.83 1 M2 PASANGAN PAVING BLOCK WARNA (6 CM)

BAHAN :Paving Block Warna 6 cm 1.0100 52,000.00 52,520.00 Pasir Beton 0.1000 m³ 136,400.00 13,640.00 Jumlah Bahan 66,160.00 UPAH :Pekerja 0.2500 org 60,000.00 15,000.00 Tukang Batu 0.5000 org 75,000.00 37,500.00 Kepala Tukang Batu 0.0250 org 95,000.00 2,375.00 Mandor 0.0030 org 100,000.00 300.00 Jumlah Pekerja 55,175.00

Jumlah Bahan + Pekerja 121,335.00 A.13.84 1 M2 PASANGAN PAVING BLOCK WARNA (8 CM)

BAHAN :Paving Block Warna 8 cm 1.0100 54,500.00 55,045.00 Pasir Beton 0.1000 m³ 136,400.00 13,640.00 Jumlah Bahan 68,685.00 UPAH :Pekerja 0.2500 org 60,000.00 15,000.00 Tukang Batu 0.5000 org 75,000.00 37,500.00 Kepala Tukang Batu 0.0250 org 95,000.00 2,375.00 Mandor 0.0030 org 100,000.00 300.00 Jumlah Pekerja 55,175.00

Jumlah Bahan + Pekerja 123,860.00 A.13.85 1 M2 PASANGAN BATU CANDI

BAHAN :Batu Candi 1.0100 95,000.00 95,950.00 Pasir Beton 0.1000 m³ 136,400.00 13,640.00 Jumlah Bahan 109,590.00 UPAH :Pekerja 0.2500 org 60,000.00 15,000.00 Tukang Batu 0.5000 org 75,000.00 37,500.00 Kepala Tukang Batu 0.0250 org 95,000.00 2,375.00 Mandor 0.0030 org 100,000.00 300.00 Jumlah Pekerja 55,175.00

Jumlah Bahan + Pekerja 164,765.00 A.13.86 1 M2 PASANGAN PAVING BLOCK NATURAL (6 CM)

BAHAN :Paving Block Natural 6 cm 1.0100 m² 47,300.00 47,773.00 Pasir Beton 0.1000 m³ 136,400.00 13,640.00 Jumlah Bahan 61,413.00 UPAH :Pekerja 0.2500 org 60,000.00 15,000.00 Tukang Batu 0.5000 org 75,000.00 37,500.00 Kepala Tukang Batu 0.0250 org 95,000.00 2,375.00 Mandor 0.0030 org 100,000.00 300.00 Jumlah Pekerja 55,175.00

Jumlah Bahan + Pekerja 116,588.00 A.13.87 1 M2 PASANGAN PAVING BLOCK NATURAL (8 CM)

BAHAN :Paving Block Natural 8 cm 1.0100 m² 49,100.00 49,591.00 Pasir Beton 0.1000 m³ 136,400.00 13,640.00 Jumlah Bahan 63,231.00 UPAH :Pekerja 0.2500 org 60,000.00 15,000.00 Tukang Batu 0.5000 org 75,000.00 37,500.00 Kepala Tukang Batu 0.0250 org 95,000.00 2,375.00 Mandor 0.0030 org 100,000.00 300.00 Jumlah Pekerja 55,175.00

Jumlah Bahan + Pekerja 118,406.00 A.14.07 1 M2 PENGECATAN BIDANG KAYU LAMA

BAHAN :Plamir 0.1500 kg 20,000.00 3,000.00 Cat dasar 0.1700 kg 69,100.00 11,747.00 Cat Penutup 0.1700 kg 69,100.00 11,747.00 Jumlah Bahan 26,494.00 UPAH :Pekerja 0.0700 Oh 60,000.00 4,200.00 Tukang Cat 0.0750 Oh 75,000.00 5,625.00 Kepala Tukang 0.0075 Oh 95,000.00 712.50 Mandor 0.0025 Oh 100,000.00 250.00 Jumlah Pekerja 10,787.50

Jumlah Bahan + Pekerja 37,281.50 A.14.08 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR), 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP

m2

m2

m2

Page 147: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 147+29

1 2 3 4 5 6 = ( 3 x 5 )BAHAN :Cat Meni 0.2000 kg 69,100.00 13,820.00 Plamir 0.1500 kg 21,800.00 3,270.00 Cat dasar 0.1700 kg 69,100.00 11,747.00 Cat Penutup 0.2600 kg 69,100.00 17,966.00 Jumlah Bahan 46,803.00 UPAH :Pekerja 0.0700 Oh 60,000.00 4,200.00 Tukang Cat 0.0090 Oh 75,000.00 675.00 Kepala Tukang 0.0060 Oh 95,000.00 570.00 Mandor 0.0025 Oh 100,000.00 250.00 Jumlah Pekerja 5,695.00

Jumlah Bahan + Pekerja 52,498.00 A.14.12 1 M2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER

BAHAN :Residu atau Ter 0.3500 ltr 1,000.00 350.00 Jumlah Bahan 350.00 UPAH :Pekerja 0.1000 Oh 60,000.00 6,000.00 Tukang Cat - Oh 75,000.00 - Kepala Tukang - Oh 95,000.00 - Mandor 0.0060 Oh 100,000.00 600.00 Jumlah Pekerja 6,600.00

Jumlah Bahan + Pekerja 6,950.00 A.14.14 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

BAHAN :Plamir 0.1000 kg 21,800.00 2,180.00 Cat dasar 0.1000 kg 14,500.00 1,450.00 Cat Penutup 2 x 0.2600 kg 14,500.00 3,770.00 Jumlah Bahan 7,400.00 UPAH :Pekerja 0.0200 Oh 60,000.00 1,200.00 Tukang Cat 0.0630 Oh 75,000.00 4,725.00 Kepala Tukang 0.0063 Oh 95,000.00 598.50 Mandor 0.0025 Oh 100,000.00 250.00 Jumlah Pekerja 6,773.50

Jumlah Bahan + Pekerja 14,173.50

Page 148: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 148+29

1 2 3 4 5 6 = ( 3 x 5 )A.14.15 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

BAHAN :Cat dasar 0.1200 kg 14,500.00 1,740.00 Cat Penutup 2 x 0.1800 lbr 14,500.00 2,610.00 Jumlah Bahan 4,350.00 UPAH :Pekerja 0.0280 Oh 60,000.00 1,680.00 Tukang Cat 0.0420 Oh 75,000.00 3,150.00 Kepala Tukang 0.0042 Oh 95,000.00 399.00 Mandor 0.0025 Oh 100,000.00 250.00 Jumlah Pekerja 5,479.00

Jumlah Bahan + Pekerja 9,829.00 A.14.19 1 M2 PEMASANGAN WALL PAPER

BAHAN :Walpapaer 1.2000 m3 - Perekat 0.2000 kg - Jumlah Bahan - UPAH :Pekerja 0.0200 Oh 60,000.00 1,200.00 Tukang Cat 0.2000 Oh 75,000.00 15,000.00 Kepala Tukang 0.0020 Oh 95,000.00 190.00 Mandor 0.0025 Oh 100,000.00 250.00 Jumlah Pekerja 16,640.00

Jumlah Bahan + Pekerja 16,640.00 A.14.21 1 M2 PLITURAN BIDANG KAYU (BIASA)

BAHAN :Dempul plitur (dempul kasar) 0.0300 kg 5,000.00 150.00 Wood Filer (INFRA) 0.2000 kg 49,600.00 9,920.00 Oker putih 0.0200 kg 52,700.00 1,054.00 Oker warna 0.0100 kg 52,700.00 527.00 Batu Apung (gosok) 0.1000 kg 17,700.00 1,770.00 Sirlak ex India 0.2000 kg 29,100.00 5,820.00 Kwas 3" 0.0100 bh 17,700.00 177.00 Spirtus 0.2000 ltr 14,900.00 2,980.00 Ampelas kayu 0.1000 lbr 3,600.00 360.00 Jumlah Bahan 22,758.00 UPAH :Pekerja 0.2500 org 60,000.00 15,000.00 Tk. Cat/Plitur 0.0285 org 75,000.00 2,137.50 Kep. tukang cat/plitur 0.0040 org 95,000.00 380.00 Mandor 0.0020 org 100,000.00 200.00 Jumlah Pekerja 17,717.50

Jumlah Bahan + Pekerja 40,475.50 A.14.24 1 M2 PENGECATAN PLAFOND DAN DINDING (INTERIOR ICI)

BAHAN :Cat tembok ICI / Sekelasnya 0.2500 lt 37,200.00 9,300.00 Cat dasar sebelum pengecatan 0.1250 lt 120,500.00 15,062.50 Rol cat 0.0100 bh 37,200.00 372.00 Ampelas 0.5000 lbr 3,600.00 1,800.00 Jumlah Bahan 26,534.50 UPAH :Pekerja 0.2000 org 60,000.00 12,000.00 Tk. cat 0.3000 org 75,000.00 22,500.00 Kep. tukang cat 0.0300 org 95,000.00 2,850.00 Mandor 0.0100 org 100,000.00 1,000.00 Jumlah Pekerja 38,350.00

Jumlah Bahan + Pekerja 64,884.50

Page 149: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 149+29

1 2 3 4 5 6 = ( 3 x 5 )A.14.25 1 M2 PENGECATAN DINDING SEKELAS VINILEX (3x)

BAHAN :Cat tembok Vinilex / Sekelas Vinilex 0.1750 kg 20,900.00 3,657.50 Plamir tembok 0.1600 kg 21,800.00 3,488.00 Rol cat 0.0100 bh 37,200.00 372.00 Ampelas 0.5000 lbr 3,600.00 1,800.00 Jumlah Bahan 9,317.50 UPAH :Pekerja 0.1040 org 60,000.00 6,240.00 Tk. cat 0.0182 org 75,000.00 1,365.00 Kep. tukang cat 0.0090 org 95,000.00 855.00 Mandor 0.0045 org 100,000.00 450.00 Jumlah Pekerja 8,910.00

Jumlah Bahan + Pekerja 18,227.50 A.14.26 1 M2 PENGECATAN PLAFOND SEKELAS VINILEX (3x)

BAHAN :Cat tembok Vinilex / Sekelas Vinilex 0.2000 kg 20,900.00 4,180.00 Plamir tembok 0.1600 kg 21,800.00 3,488.00 Rol cat 0.0100 bh 37,200.00 372.00 Ampelas 0.5000 lbr 3,600.00 1,800.00 Jumlah Bahan 9,840.00 UPAH :Pekerja 0.2000 org 60,000.00 12,000.00 Tk. cat 0.0280 org 75,000.00 2,100.00 Kep. tukang cat 0.0150 org 95,000.00 1,425.00 Mandor 0.0090 org 100,000.00 900.00 Jumlah Pekerja 16,425.00

Jumlah Bahan + Pekerja 26,265.00 A.14.28 1 M2 PENGECATAN DINDING SEKELAS SANLEX (3x)

BAHAN :Cat tembok Sanlex / Sekelas Sanlex 0.1750 kg 14,500.00 2,537.50 Plamir tembok 0.1600 kg 21,800.00 3,488.00 Rol cat 0.0100 bh 37,200.00 372.00 Ampelas 0.5000 lbr 3,600.00 1,800.00 Jumlah Bahan 8,197.50 UPAH :Pekerja 0.1040 org 60,000.00 6,240.00 Tk. cat 0.0182 org 75,000.00 1,365.00 Kep. tukang cat 0.0090 org 95,000.00 855.00 Mandor 0.0045 org 100,000.00 450.00 Jumlah Pekerja 8,910.00

Jumlah Bahan + Pekerja 17,107.50 A.14.29 1 M2 PENGECATAN PLAFOND SEKELAS SANLEX (3x)

BAHAN :Cat tembok Sanlex / Sekelas Sanlex 0.2000 kg 14,500.00 2,900.00 Plamir tembok 0.1600 kg 21,800.00 3,488.00 Rol cat 0.0100 bh 37,200.00 372.00 Ampelas 0.5000 lbr 3,600.00 1,800.00 Jumlah Bahan 8,560.00 UPAH :Pekerja 0.2000 org 60,000.00 12,000.00 Tk. cat 0.0280 org 75,000.00 2,100.00 Kep. tukang cat 0.0150 org 95,000.00 1,425.00 Mandor 0.0090 org 100,000.00 900.00 Jumlah Pekerja 16,425.00

Jumlah Bahan + Pekerja 24,985.00

Page 150: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 150+29

1 2 3 4 5 6 = ( 3 x 5 )A.14.30 1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI

BAHAN :Meni kayu 0.1670 kg 28,400.00 4,742.80 Plamir kayu 0.0830 kg 20,000.00 1,660.00 Cat kayu sekelas SEIV 0.2000 kg 80,000.00 16,000.00 Amplas kayu 0.4000 lbr 3,600.00 1,440.00 Minyak cat terpenting 0.1500 ltr 7,100.00 1,065.00 Kwas 3" 0.0500 bh 17,700.00 885.00 Jumlah Bahan 25,792.80 UPAH :Pekerja 0.2000 org 60,000.00 12,000.00 Tk. Cat 0.0600 org 75,000.00 4,500.00 Kep. tukang cat 0.0300 org 95,000.00 2,850.00 Mandor 0.0100 org 100,000.00 1,000.00 Jumlah Pekerja 20,350.00

Jumlah Bahan + Pekerja 46,142.80 A.14.31 1 M2 PENGECATAN BESI (3X)

BAHAN :Meni besi 0.1670 kg 28,400.00 4,742.80 Cat besi sekelas Seiv 0.2000 kg 76,800.00 15,360.00 Amplas besi 0.4000 lbr 3,600.00 1,440.00 Minyak cat / thiner B 0.1500 ltr 30,000.00 4,500.00 Kwas 3" 0.0500 bh 17,700.00 885.00 Jumlah Bahan 26,927.80 UPAH :Pekerja 0.2000 org 70,000.00 14,000.00 Tk. Cat 0.0600 org 90,000.00 5,400.00 Kep. tukang cat 0.0300 org 95,000.00 2,850.00 Mandor 0.0100 org 100,000.00 1,000.00 Jumlah Pekerja 23,250.00

Jumlah Bahan + Pekerja 50,177.80 A.14.32 1 M2 PENGECATAN BIDANG KAYU LAMA BERCAT

BAHAN :Ampelas Kayu 0.2500 lbr 3,600.00 900.00 Cat kayu sekelas SEIV 0.1700 kg 80,000.00 13,600.00 Kwas 3" 0.0500 bh 17,700.00 885.00 Jumlah Bahan 15,385.00 UPAH :Pembantu Tukang 0.2000 org 60,000.00 12,000.00 Tk. Cat 0.0750 org 75,000.00 5,625.00 Kep. tukang cat 0.0300 org 95,000.00 2,850.00 Mandor 0.0100 org 100,000.00 1,000.00 Jumlah Pekerja 21,475.00

Jumlah Bahan + Pekerja 36,860.00 A.14.33 1 M2 PENGECATAN DINDING (LAMA)

BAHAN :Cat Tembok sekelas Sanlex 0.1700 Kg 14,500.00 2,465.00 Roll Cat 0.0100 bh 37,200.00 372.00 Ampelas 0.2500 lbr 3,600.00 900.00 Jumlah Bahan 3,737.00 UPAH :Pembantu Tukang 0.0700 org 60,000.00 4,200.00 Tk. Cat 0.0750 org 75,000.00 5,625.00 Kep. tukang cat 0.0075 org 95,000.00 712.50 Mandor 0.0025 org 100,000.00 250.00 Jumlah Pekerja 10,787.50

Jumlah Bahan + Pekerja 14,524.50

Page 151: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 151+29

1 2 3 4 5 6 = ( 3 x 5 )

A002 1 M1 PEK. PASANGAN BOUWPLANKKayu Albasiah 0.0100 m³ 2,009,100.00 20,091.00 Paku 4 - 7 0.0380 kg 16,400.00 623.20 Ongkos Pasang 0.1550 ls 20,714.20 3,210.70 Jumlah 23,924.90 Keuntungan Max. 2,392.49 Jumlah 26,317.39 Dibulatkan 26,310.00

A003 1 M2 LOS KERJA / GUDANGKayu Albasiah 0.1000 m³ 2,009,100.00 200,910.00 Paku 4 - 7 0.2500 kg 16,400.00 4,100.00 Seng Glb BJLS 30 1.1000 lbr 49,600.00 54,560.00 Triplex 3 mm 0.5000 lbr 91,700.00 45,850.00 PC (50 kg) 0.1000 zak 90,900.00 9,090.00 Peralatan 0.0250 lot 314,510.00 7,862.75 Ongkos Pasang 0.1250 ls 322,372.75 40,296.59 Jumlah 362,669.34

A004 1 M2 PEK. KANTOR DIREKSIKayu Albasiah 0.1000 m³ 2,009,100.00 200,910.00 Paku 4 - 7 0.2500 kg 16,400.00 4,100.00 Seng Glb BJLS 28 ( 80 x 180 cm ) 1.1000 lbr 23,900.00 26,290.00 Triplex 3 mm 0.5000 lbr 91,700.00 45,850.00 PC (50 kg) 0.1000 zak 90,900.00 9,090.00 Pasir pasang 0.2500 m³ 118,200.00 29,550.00 Bata merah 70.0000 bh 400.00 28,000.00 Peralatan 0.0200 lot 343,790.00 6,875.80 Ongkos Pasang 0.1500 ls 343,790.00 51,568.50 Jumlah 402,234.30

A005 1 M2 PAPAN NAMA PROYEKKayu Albasiah 0.1300 m³ 2,009,100.00 261,183.00 Paku 4 - 7 0.2500 kg 16,400.00 4,100.00 Pengecatan Kayu 1.0000 ls 20,350.00 20,350.00 Penulisan 0.1250 ls 285,633.00 35,704.13 Ongkos Pasang 0.1250 ls 321,337.13 40,167.14 Jumlah 361,504.27

A006 1 M2 PAGAR PENGAMAN PROYEKSeng Glb BJLS 28 ( 80 x 180 ) 1.4300 lbr 23,900.00 34,177.00 Kayu Albasiah 0.0360 m³ 2,000,000.00 72,000.00 Paku 4 - 7 0.2000 kg 16,400.00 3,280.00 Pengecatan cat minyak 2x bag. luar 1.8000 m² 15,500.00 27,900.00 Ongkos Pasang 0.2000 ls 137,357.00 27,471.40 Jumlah 164,828.40

A007 1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 1 M'Tukang Gali 0.4000 org 70,000.00 28,000.00 Mandor 0.0400 org 100,000.00 4,000.00 Alat Bantu 0.0500 lot 32,000.00 1,600.00 Jumlah 33,600.00

Page 152: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 152+29

1 2 3 4 5 6 = ( 3 x 5 )A008 1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 2 M'

Tukang Gali 0.5260 org 70,000.00 36,820.00 Mandor 0.0520 org 100,000.00 5,200.00 Alat Bantu 0.0500 lot 42,020.00 2,101.00 Jumlah 44,121.00

A009 1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 3 M'Tukang Gali 0.7350 org 70,000.00 51,450.00 Mandor 0.0730 org 100,000.00 7,300.00 Alat Bantu 0.0500 lot 58,750.00 2,937.50 Jumlah 61,687.50

A010 1 M3 PEK.GALIAN TANAH BIASA MAX KEDALAMAN 4 M'Tukang Gali 0.9440 org 70,000.00 66,080.00 Mandor 0.0940 org 100,000.00 9,400.00 Alat Bantu 0.0500 lot 75,480.00 3,774.00 Jumlah 79,254.00

A011 1 M3 PEK.GALIAN TANAH BIASA KEDALAMAN 5 M1Tukang Gali 1.1530 org 70,000.00 80,710.00 Mandor 0.1150 org 100,000.00 11,500.00 Alat Bantu 0.0500 lot 92,210.00 4,610.50 Jumlah 96,820.50

A012 1 M3 PEK.GALIAN TANAH BERBATU / TANAH KERAS MAX KEDALAMAN 1 MTukang Gali 0.6250 org 70,000.00 43,750.00 Mandor 0.1250 org 100,000.00 12,500.00 Alat Bantu 0.2500 lot 56,250.00 14,062.50 Jumlah 70,312.50

A013 1 M3 PEK.GALIAN TANAH CADAS MAX KEDALAMAN 1 MTukang Gali 0.7500 org 70,000.00 52,500.00 Mandor 0.1250 org 100,000.00 12,500.00 Alat Bantu 0.2500 lot 65,000.00 16,250.00 Jumlah 81,250.00

A014 1 M3 PEK.GALIAN TANAH LUMPUR MAX KEDALAMAN 1 MTukang Gali 0.5250 org 70,000.00 36,750.00 Mandor 0.1250 org 100,000.00 12,500.00 Alat Bantu 0.2500 lot 49,250.00 12,312.50 Jumlah 61,562.50

A015 1 M2 PEK. STRIPING TANAH TEBAL = 20 CMTukang Gali 0.0500 org 70,000.00 3,500.00 Mandor 0.0050 org 100,000.00 500.00 Alat Bantu 0.3500 lot 4,000.00 1,400.00 Jumlah 5,400.00

A016 1 M3 PEK. PEMBUANGAN DALAM RADIUS 150 METERTukang Gali 0.2500 org 70,000.00 17,500.00 Mandor 0.0500 org 100,000.00 5,000.00 Alat Bantu 0.1000 lot 22,500.00 2,250.00 Jumlah 24,750.00

Page 153: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 153+29

1 2 3 4 5 6 = ( 3 x 5 )A017 1 M3 URUGAN TANAH KEMBALI

Tukang Gali 0.1920 org 70,000.00 13,440.00 Mandor 0.0190 org 100,000.00 1,900.00 Alat Bantu 0.1000 lot 15,340.00 1,534.00 Jumlah 16,874.00

A018 1 M3 PEK. PEMADATAN TANAH SETIAP 20 CM Tukang Gali 0.3000 org 70,000.00 21,000.00 Mandor 0.0300 org 100,000.00 3,000.00 Alat Bantu ( Sewa Stamper ) 0.1250 lot 24,000.00 3,000.00 Jumlah 27,000.00

A019 1 M3 PEK. LAPISAN PUDEL 1 KP : 3 TS : 7 TLPasir Pasang 0.3300 m³ 118,200.00 39,006.00 Kapur Padam 0.1000 m³ 161,300.00 16,130.00 Tanah liat 0.7630 m³ 52,700.00 40,210.10 Tukang Gali 0.8330 org 70,000.00 58,310.00 Tk.batu setengah terampil 0.4160 org 75,000.00 31,200.00 Kep.tukang batu 0.0400 org 95,000.00 3,800.00 Mandor 0.0083 org 100,000.00 830.00 Jumlah 189,486.10

A020 1 M3 PEK. LAPISAN PUDEL 1 KP : 5 TLKapur Padam 0.2000 m³ 161,300.00 32,260.00 Tanah liat 1.0000 m³ 52,700.00 52,700.00 Tukang Gali 0.8330 org 70,000.00 58,310.00 Tk.batu setengah terampil 0.4160 org 75,000.00 31,200.00 Kep.tukang batu 0.4100 org 95,000.00 38,950.00 Mandor 0.0830 org 100,000.00 8,300.00 Jumlah 221,720.00

A021 1 M3 PEK. LAPISAN PUDEL 1 KP : 5 TSPasir Pasang 1.0000 m³ 118,200.00 118,200.00 Kapur Padam 0.2000 m³ 161,300.00 32,260.00 Tukang Gali 0.8330 org 70,000.00 58,310.00 Tk.batu setengah terampil 0.4160 org 75,000.00 31,200.00 Kep.tukang batu 0.0410 org 95,000.00 3,895.00 Mandor 0.0830 org 100,000.00 8,300.00 Jumlah 252,165.00

A022 1 M2 PEK. PEMASANGAN LAPISAN INJUK T = 10 CMInjuk 6.0000 kg 21,800.00 130,800.00 Pekerja 0.1500 org 60,000.00 9,000.00 Mandor 0.0150 org 100,000.00 1,500.00 Jumlah 141,300.00

A023 1 M3 PEK. PERKERASAN SIRTU DIPADATKAN SETIAP 20 CMSirtu ( Membeli Sirtu ) 1.2000 m³ 148,900.00 178,680.00 Tukang Gali 0.2500 org 70,000.00 17,500.00 Mandor 0.0250 org 100,000.00 2,500.00 Alat Bantu ( Pek. Pemadatan Tanah 1 m3 ) 0.1000 lot 198,680.00 19,868.00 Jumlah 218,548.00

Page 154: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 154+29

1 2 3 4 5 6 = ( 3 x 5 )A024 1 M2 PEK. PEMBUATAN JALAN SEMENTARA TEBAL 20 CM

Batu Belah 0.2500 m³ 154,500.00 38,625.00 Kerikil ( batu koral hitam / kali ) 0.0300 m³ 228,200.00 6,846.00 Pasir Pasang 0.0500 m³ 118,200.00 5,910.00 Tukang Gali 0.5000 org 70,000.00 35,000.00 Mandor 0.1000 org 100,000.00 10,000.00 Alat Bantu ( Pek. Pemadatan Tanah 1 m2 ) 0.0600 lot 96,381.00 5,782.86 Jumlah 102,163.86

A025 1 M3 PEK.GALIAN TANAH SUMURAN MAX KEDALAMAN 10 M'Tukang Gali 1.1500 org 70,000.00 80,500.00 Mandor 0.0250 org 100,000.00 2,500.00 Alat Bantu 0.2000 lot 83,000.00 16,600.00 Jumlah 99,600.00

A026 1 M3 URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPADATKAN (5000M3)Pek. Galian ( 10 org ) 50 % 0.6000 m³ 44,121.00 13,236.30 Pek. Galian tanah berbatu ( 10 org ) 50 % 0.6000 m³ 70,312.50 21,093.75 Pek. Grading Plant ( 10 org ) 50 % 5.0000 m² 5,400.00 13,500.00 Beli Tanah + Angkut Max 10 Km 1.2000 m³ 4,000.00 4,800.00 Jumlah 52,630.05

A027 1 M3 URUGAN PASIR URUGPasir Urug 1.2000 m³ 100,000.00 120,000.00 Pekerja 0.1500 org 60,000.00 9,000.00 Mandor 0.0100 org 100,000.00 1,000.00 Jumlah 130,000.00

A027 Rob 1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR)Tanah Urug (didatangkan) 1.2000 m³ 11,800.00 14,160.00 Tukang Gali 0.4500 org 70,000.00 31,500.00 Mandor 0.0450 org 100,000.00 4,500.00 Alat Bantu (sewa stamper) 0.1250 lot 45,660.00 5,707.50 Jumlah 55,867.50

A028 1 M3 LANTAI KERJA 1 PC : 3 PS : 5 KRL(dengan Split 2/3)PC (50 kg) 218.0000 kg 1,800.00 392,400.00 Pasir pasang 0.5200 m³ 118,200.00 61,464.00 Split Pecah mesin 2/3 0.8700 m³ 272,700.00 237,249.00 Pekerja 1.6500 org 60,000.00 99,000.00 Tk. Batu Setengah Terampil 0.2500 org 75,000.00 18,750.00 Kep. Tukang Batu 0.0250 org 95,000.00 2,375.00 Mandor 0.0800 org 100,000.00 8,000.00 Peralatan 0.0750 lot 128,125.00 9,609.38 Jumlah 828,847.38

Page 155: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 155+29

1 2 3 4 5 6 = ( 3 x 5 )400.02.1 1 M3 Membuat Plat Beton Bertulang (211,909 Kg Besi + Bekesting)

Bekesting Albasiah 0.2450 m³ 2,009,100.00 492,229.50 Paku 5 - 7 cm 1.5000 kg 16,400.00 24,600.00 Pelumas Bekesting 0.4000 lt 36,600.00 14,640.00 Besi Beton Polos U 24 211.9090 kg 14,500.00 3,072,680.50 Kawat Beton 2.2500 kg 15,500.00 34,875.00 Semen Portland ( PC. ) 6.4600 zak 90,900.00 587,214.00 Pasir Beton 0.5200 m³ 136,400.00 70,928.00 Batu Pecah 2/3 0.7800 m³ 272,700.00 212,706.00 Tukang Batu 0.3500 org 90,000.00 31,500.00 Tukang Kayu 1.0400 org 90,000.00 93,600.00 Tukang Besi 1.0500 org 90,000.00 94,500.00 Kepala Tukang 0.2450 org 95,000.00 23,275.00 Pembantu Tukang 3.9000 org 60,000.00 234,000.00 Mandor 0.1650 org 100,000.00 16,500.00 Jumlah 5,003,248.00 Keuntungan Max. 10 % 500,324.80 Jumlah 5,503,572.80 Dibulatkan 5,503,570.00

A029 1 M3 PAS. BETON CYCLOOF + 40% BATU BELAHBatu Belah 40% 0.4800 m³ 154,500.00 74,160.00 Adukan Beton Tumbuk 1:3:5 0.6000 m³ 828,847.38 497,308.43 Upah Kerja 0.0400 ls 571,468.43 22,858.74 Jumlah 594,327.16

A030 1 M3 COR BETON SITE MIX K 175Semen PC (50 kg) 6.8000 zak 90,900.00 618,120.00 Split pecah mesin 2/3 0.8300 m³ 272,700.00 226,341.00 Pasir Beton 0.5400 m³ 136,400.00 73,656.00 Pekerja 1.5000 org 60,000.00 90,000.00 Tukang batu setengah terampil 0.5000 org 75,000.00 37,500.00 Kep. tukang batu 0.0500 org 95,000.00 4,750.00 Mandor 0.0100 org 100,000.00 1,000.00 Peralatan 0.0700 lot 1,051,367.00 73,595.69 Jumlah 1,124,962.69

A031 1 M3 COR BETON SITE MIX K 225Semen PC (50 kg) 7.8960 zak 90,900.00 717,746.40 Split pecah mesin 2/3 0.8100 m³ 272,700.00 220,887.00 Pasir beton 0.4900 m³ 136,400.00 66,836.00 Pekerja 1.5000 org 60,000.00 90,000.00 Tk.batu setengah terampil 0.5000 org 75,000.00 37,500.00 Kepala tk. batu 0.0500 org 95,000.00 4,750.00 Mandor 0.0100 org 100,000.00 1,000.00 Peralatan 0.0700 lot 1,138,719.40 79,710.36 Jumlah 1,218,429.76

A032 1 M3 COR BETON SITE MIX K 300Semen PC (50 kg) 8.6960 zak 90,900.00 790,466.40 Split pecah mesin 2/3 0.8100 m³ 272,700.00 220,887.00 Pasir beton 0.4900 m³ 136,400.00 66,836.00 Pekerja 1.5000 org 60,000.00 90,000.00 Tk.batu setengah terampil 0.5000 org 75,000.00 37,500.00 Kepala tk. batu 0.0500 org 95,000.00 4,750.00 Mandor 0.0100 org 100,000.00 1,000.00 Peralatan 0.7000 lot 1,211,439.40 848,007.58 Jumlah 2,059,446.98

Page 156: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 156+29

1 2 3 4 5 6 = ( 3 x 5 )A033 1 M3 COR BETON K-175 READY MIX MIN 6 M3 BERIKUT SLANG

Adukan K-175 Readymix 1.0000 m³ 898,200.00 898,200.00 Pekerja 2.5000 org 60,000.00 150,000.00 Tukang batu setengah terampil 0.2500 org 75,000.00 18,750.00 Kep. tukang batu 0.1000 org 95,000.00 9,500.00 Mandor 0.0100 org 100,000.00 1,000.00 Alat bantu (Slang + Tes Lab) 0.0450 lot 1,077,450.00 48,485.25 Jumlah 1,125,935.25

A034 1 M3 COR BETON K-225 READY MIX MIN 6 M3 BERIKUT SLANGAdukan K-225 Readymix 1.0000 m³ 1,040,000.00 1,040,000.00 Pekerja 2.5000 org 60,000.00 150,000.00 Tukang batu setengah terampil 0.2500 org 75,000.00 18,750.00 Kep. tukang batu 0.1000 org 95,000.00 9,500.00 Mandor 0.0100 org 100,000.00 1,000.00 Alat bantu (Slang + Tes Lab) 0.0450 lot 1,219,250.00 54,866.25 Jumlah 1,274,116.25

A035 1 M3 COR BETON K-300 READY MIX MIN 6 M3 BERIKUT SLANGAdukan K-300 Readymix 1.0000 m³ 1,229,100.00 1,229,100.00 Pekerja 2.5000 org 60,000.00 150,000.00 Tukang batu setengah terampil 0.2500 org 75,000.00 18,750.00 Kep. tukang batu 0.1000 org 95,000.00 9,500.00 Mandor 0.0100 org 100,000.00 1,000.00 Alat bantu (Slang + Tes Lab) 0.0450 lot 1,408,350.00 63,375.75 Jumlah 1,471,725.75

A036 1 KG BESI BETON TERPASANG U - 24Besi Beton rata - rata 1.0500 kg 14,500.00 15,225.00 Kawat Beton 0.0100 kg 15,500.00 155.00 Tk. Besi Beton setengah terampil 0.0250 org 75,000.00 1,875.00 Tk. Besi Beton terampil 0.0150 org 90,000.00 1,350.00 Kepala Tukang Besi terampil 0.0100 org 95,000.00 950.00 Mandor 0.0050 org 100,000.00 500.00 Peralatan, Spancer 0.0200 lot 20,055.00 401.10 Jumlah 20,456.10

A037 1 KG BESI BETON TERPASANG U - 39Besi Beton rata - rata U - 39 1.0500 kg 16,400.00 17,220.00 Kawat Beton 0.0100 kg 15,500.00 155.00 Tk. Besi Beton setengah terampil 0.0360 org 75,000.00 2,700.00 Tk. Besi Beton terampil 0.0160 org 90,000.00 1,440.00 Kepala Tukang Besi terampil 0.0110 org 95,000.00 1,045.00 Mandor 0.0050 org 100,000.00 500.00 Peralatan, Spancer 0.0200 lot 23,060.00 461.20 Jumlah 23,521.20

A046 1 M2 BEKISTING DENGAN PAPANKayu Lokal Kelas II 0.0170 m³ 3,545,500.00 30,136.75 Papan terentang ( 2X pakai ) 75 % Kayu Albasiah 0.0240 m³ 2,009,100.00 36,163.80 Paku 0.4000 kg 16,400.00 6,560.00 Pekerja 0.1200 org 60,000.00 7,200.00 Tk. Kayu terampil 0.1500 org 90,000.00 13,500.00 Kepala Tukang Kayu 0.1500 org 95,000.00 14,250.00 Mandor 0.0500 org 100,000.00 5,000.00 Tk. Kayu 1/2 terampil (bongkar cetakan) 0.1200 org 75,000.00 9,000.00 Jumlah 121,810.55

Page 157: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 157+29

1 2 3 4 5 6 = ( 3 x 5 )A047 1 M2 BEKISTING MULTIPLEX 9 MM

Kayu Lokal Kelas II 0.0170 m³ 3,545,500.00 30,136.75 Multiplek 9 mm ( 2 x pakai ) 75% 0.3470 lbr 213,900.00 55,667.47 Paku 0.4000 kg 16,400.00 6,560.00 Pekerja 0.1200 org 60,000.00 7,200.00 Tk. Kayu terampil 0.1500 org 90,000.00 13,500.00 Kepala Tukang Kayu 0.1500 org 95,000.00 14,250.00 Mandor 0.0500 org 100,000.00 5,000.00 Tk. Kayu 1/2 terampil (bongkar cetakan) 0.1200 org 75,000.00 9,000.00 Jumlah 141,314.23

A048 1 M2 BEKISTING MULTIPLEX 12 MMKayu Lokal Kelas II 0.0170 m³ 3,545,500.00 30,136.75 Multiplek 12 mm ( 2 x pakai ) 75% 0.3470 lbr 285,300.00 74,249.33 Paku 0.4000 kg 16,400.00 6,560.00 Pekerja 0.1200 org 60,000.00 7,200.00 Tk. Kayu terampil 0.1500 org 90,000.00 13,500.00 Kepala Tukang Kayu 0.1500 org 95,000.00 14,250.00 Mandor 0.0500 org 100,000.00 5,000.00 Tk. Kayu 1/2 terampil (bongkar cetakan) 0.1200 org 75,000.00 9,000.00 Jumlah 159,896.08

A049 1 M2 PASANGAN STOOT WERKKayu stoot ( dinding 2x pakai ) 50% 9.0000 bt 47,300.00 212,850.00 Papan Albasiah ( 2X pakai ) 0.0160 m³ 2,009,100.00 32,145.60 Paku 0.5000 kg 16,400.00 8,200.00 Pekerja 0.1500 org 60,000.00 9,000.00 Tk. Kayu terampil 0.2000 org 90,000.00 18,000.00 Kepala tukang Kayu 0.2000 org 95,000.00 19,000.00 Mandor 0.0170 org 100,000.00 1,700.00 Jumlah 300,895.60

A050 1 M3 PASANGAN ANSTAMPING BATU BELAHBatu Belah 1.2000 m³ 154,500.00 185,400.00 Pasir Urug 0.1000 m³ 100,000.00 10,000.00 Pekerja 0.5000 org 60,000.00 30,000.00 Tk.batu setengah terampil 0.5625 org 75,000.00 42,187.50 Kep.tukang batu 0.0750 org 95,000.00 7,125.00 Mandor 0.0563 org 100,000.00 5,630.00 Jumlah 280,342.50

A051 1 M3 PASANGAN BATU BRONJONGBatu Kali ( Batu Bulat ) Bronjol 1.2000 m³ 141,800.00 170,160.00 Kawat Bronjong 3.5000 kg 12,300.00 43,050.00 Pekerja 1.5000 org 60,000.00 90,000.00 Pekerja Terampil 0.2000 org 70,000.00 14,000.00 Mandor 0.0200 org 100,000.00 2,000.00 Jumlah 319,210.00

A052 Rob 1 M2 PASANGAN LEMPENGAN RUMPUT SAMPAI TUMBUH Lempengan Rumput Gajah 1.2000 m² 4,200.00 5,040.00 Pekerja Setengah Terampil 0.0400 org 95,000.00 3,800.00 Mandor 0.0100 org 65,000.00 650.00 Jumlah 9,490.00

Page 158: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 158+29

1 2 3 4 5 6 = ( 3 x 5 )A053 1 M3 PASANGAN BATU BELAH 1 : 6

Batu Belah 1.2000 m³ 154,500.00 185,400.00 P C (50 kg) 2.3400 zak 90,900.00 212,706.00 Pasir Pasang 0.5610 m³ 118,200.00 66,310.20 Pekerja 1.2500 org 60,000.00 75,000.00 Tk.batu setengah terampil 0.5000 org 75,000.00 37,500.00 Kep.tukang batu 0.1125 org 95,000.00 10,687.50 Mandor 0.0169 org 100,000.00 1,690.00 Jumlah 589,293.70

A054 1 M3 PASANGAN BATU BELAH 1 : 5Batu Belah 1.2000 m³ 154,500.00 185,400.00 P C (50 kg) 2.7200 zak 90,900.00 247,248.00 Pasir Pasang 0.5440 m³ 118,200.00 64,300.80 Pekerja 1.2500 org 60,000.00 75,000.00 Tk.batu setengah terampil 0.5000 org 75,000.00 37,500.00 Kep.tukang batu 0.1125 org 95,000.00 10,687.50 Mandor 0.0169 org 100,000.00 1,690.00 Jumlah 621,826.30

A055 1 M3 PASANGAN BATU BELAH 1 : 4Batu Belah 1.2000 m³ 154,500.00 185,400.00 P C (50 kg) 3.2600 zak 90,900.00 296,334.00 Pasir Pasang 0.5200 m³ 118,200.00 61,464.00 Pekerja 1.2500 org 60,000.00 75,000.00 Tk.batu setengah terampil 0.5000 org 75,000.00 37,500.00 Kep.tukang batu 0.1125 org 95,000.00 10,687.50 Mandor 0.0169 org 100,000.00 1,690.00 Jumlah 668,075.50

A056 1 M3 PASANGAN BATU BELAH 1 : 3Batu Belah 1.2000 m³ 154,500.00 185,400.00 P C (50 kg) 4.0400 zak 90,900.00 367,236.00 Pasir Pasang 0.4850 m³ 118,200.00 57,327.00 Pekerja 1.2500 org 60,000.00 75,000.00 Tk.batu setengah terampil 0.5000 org 75,000.00 37,500.00 Kep.tukang batu 0.1125 org 95,000.00 10,687.50 Mandor 0.1690 org 100,000.00 16,900.00 Jumlah 750,050.50

A057 1 M3 PASANGAN BATU BELAH 1 : 2,5 Batu Belah 1.2000 m³ 154,500.00 185,400.00 P C (50 kg) 1.5900 zak 90,900.00 144,531.00 Pasir Pasang 0.3800 m³ 118,200.00 44,916.00 Pekerja 1.2500 org 60,000.00 75,000.00 Tk.batu setengah terampil 0.5000 org 75,000.00 37,500.00 Kep.tukang batu 0.1125 org 95,000.00 10,687.50 Mandor 0.0169 org 100,000.00 1,690.00 Jumlah 499,724.50

A058 1 M3 PASANGAN BATU BELAH 1 : 2Batu Belah 1.2000 m³ 154,500.00 185,400.00 P C (50 kg) 5.3400 zak 90,900.00 485,406.00 Pasir Pasang 0.4270 m³ 118,200.00 50,471.40 Pekerja 1.2500 org 60,000.00 75,000.00 Tk.batu setengah terampil 0.5000 org 60,000.00 30,000.00 Kep.tukang batu 0.1125 org 95,000.00 10,687.50 Mandor 0.0169 org 100,000.00 1,690.00 Jumlah 838,654.90

Page 159: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 159+29

1 2 3 4 5 6 = ( 3 x 5 )A059 1 M3 PASANGAN BATU BELAH 1 : 1

Batu Belah 1.2000 m³ 154,500.00 185,400.00 P C (50 kg) 7.8400 zak 90,900.00 712,656.00 Pasir Pasang 0.3140 m³ 118,200.00 37,114.80 Pekerja 1.2500 org 60,000.00 75,000.00 Tk.batu setengah terampil 0.5000 org 75,000.00 37,500.00 Kep.tukang batu 0.1125 org 95,000.00 10,687.50 Mandor 0.0169 org 100,000.00 1,690.00 Jumlah 1,060,048.30

A060 1 M3 PAS. BATU BELAH 1 : 4 PAKAI MUKA BATU SEGI ENAM + SIARANBatu Belah 1.5000 m³ 154,500.00 231,750.00 P C (50 kg) 1.2500 zak 90,900.00 113,625.00 Pasir Pasang 0.3480 m³ 118,200.00 41,133.60 Pekerja Terampil 1.2500 org 70,000.00 87,500.00 Tk.batu terampil 1.1250 org 90,000.00 101,250.00 Kep.tukang batu 0.1125 org 95,000.00 10,687.50 Mandor 0.0169 org 100,000.00 1,690.00 Jumlah 587,636.10

A061 1 M2 PAS. BATU TEMPEL + SIARANBatu Tempel 1.1000 m2 154,500.00 169,950.00 P C (50 kg) 0.1200 Zak 90,900.00 10,908.00 Pasir Pasang 0.0310 m³ 118,200.00 3,664.20 Pekerja Terampil 0.1875 org 70,000.00 13,125.00 Tk.batu terampil 0.2250 org 90,000.00 20,250.00 Kep.tukang batu 0.0375 org 95,000.00 3,562.50 Mandor 0.0338 org 100,000.00 3,380.00 Peralatan 0.0250 lot 224,839.70 5,620.99 Jumlah 230,460.69

A063 B 1 M2 PASANGAN BATU MUKABatu Muka 1.0100 m² 42,000.00 42,420.00 P.C (50 kg) 0.1600 zak 90,900.00 14,544.00 Pasir pasang 0.0300 m³ 118,200.00 3,546.00 Semen warna 0.0130 kg 9,100.00 118.30 Pekerja trampil 0.1875 org 70,000.00 13,125.00 Tk. batu trampil 0.3750 org 90,000.00 33,750.00 Kep. Tukang batu 0.0750 org 95,000.00 7,125.00 Mandor 0.0188 org 100,000.00 1,880.00 Jumlah 116,508.30

A071 1 M2 PASANGAN BATA MERAH 1 : 2Bata merah 70.0000 bh 400.00 28,000.00 P.C (50 kg) 0.5440 zak 90,900.00 49,449.60 Pasir pasang 0.0470 m³ 118,200.00 5,555.40 Pekerja setengah trampil 0.4290 org 65,000.00 27,885.00 Tk. batu setengah trampil 0.2140 org 75,000.00 16,050.00 Kep. Tukang batu 0.0210 org 95,000.00 1,995.00 Mandor 0.0110 org 100,000.00 1,100.00 Jumlah 130,035.00

A072 1 M2 PASANGAN BATA MERAH 1 : 3Bata merah 70.0000 bh 400.00 28,000.00 P.C (50 kg) 0.4200 zak 90,900.00 38,178.00 Pasir pasang 0.0540 m³ 118,200.00 6,382.80 Pekerja setengah trampil 0.4290 org 65,000.00 27,885.00 Tk. batu setengah trampil 0.2140 org 75,000.00 16,050.00 Kep. Tukang batu 0.0210 org 95,000.00 1,995.00 Mandor 0.0110 org 100,000.00 1,100.00 Jumlah 119,590.80

Page 160: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 160+29

1 2 3 4 5 6 = ( 3 x 5 )A073 1 M2 PASANGAN BATA MERAH 1 : 4

Bata merah 70.0000 bh 400.00 28,000.00 P.C (50 kg) 0.3354 zak 90,900.00 30,484.22 Pasir pasang 0.0580 m³ 118,200.00 6,855.60 Pekerja setengah trampil 0.3218 org 65,000.00 20,917.00 Tk. batu setengah trampil 0.1805 org 75,000.00 13,537.50 Kep. Tukang batu 0.0158 org 95,000.00 1,501.00 Mandor 0.0083 org 100,000.00 830.00 Jumlah 102,125.32

A074 1 M2 PASANGAN BATA MERAH 1 : 5Bata merah 70.0000 bh 400.00 28,000.00 P.C (50 kg) 0.1936 zak 90,900.00 17,598.24 Pasir pasang 0.0450 m³ 118,200.00 5,319.00 Pekerja setengah trampil 0.3200 org 65,000.00 20,800.00 Tk. batu setengah trampil 0.1000 org 75,000.00 7,500.00 Kep. Tukang batu 0.0100 org 95,000.00 950.00 Mandor 0.0150 org 100,000.00 1,500.00 Jumlah 81,667.24

A075 1 M2 PLESTERAN DINDING 1 : 2 + ACIANP.C (50 kg) 0.2368 zak 90,900.00 21,525.12 Pasir pasang 0.0190 m³ 118,200.00 2,245.80 Pekerja setengah trampil 0.2860 org 65,000.00 18,590.00 Tk. batu setengah trampil 0.2140 org 75,000.00 16,050.00 Kep. Tukang batu 0.0210 org 95,000.00 1,995.00 Mandor 0.0200 org 100,000.00 2,000.00 Jumlah 62,405.92

A076 1 M2 PLESTERAN DINDING 1 : 3 + ACIANP.C (50 kg) 0.1600 zak 90,900.00 14,544.00 Pasir pasang 0.0190 m³ 118,200.00 2,245.80 Pekerja setengah trampil 0.2860 org 65,000.00 18,590.00 Tk. batu setengah trampil 0.2140 org 75,000.00 16,050.00 Kep. Tukang batu 0.0210 org 95,000.00 1,995.00 Mandor 0.0200 org 100,000.00 2,000.00 Jumlah 55,424.80

A078 1 M2 PLESTERAN DINDING 1 : 4 + ACIANP.C (50 kg) 0.1404 zak 90,900.00 12,762.36 Pasir pasang 0.0190 m³ 118,200.00 2,245.80 Pekerja setengah trampil 0.2860 org 65,000.00 18,590.00 Tk. batu setengah trampil 0.2140 org 75,000.00 16,050.00 Kep. Tukang batu 0.0210 org 95,000.00 1,995.00 Mandor 0.0200 org 100,000.00 2,000.00 Jumlah 53,643.16

A079 1 M2 PLESTERAN DINDING 1 : 5 + ACIANP.C (50 kg) 0.0864 zak 90,900.00 7,853.76 Pasir pasang 0.0220 m³ 118,200.00 2,600.40 Pekerja setengah trampil 0.2000 org 65,000.00 13,000.00 Tk. batu setengah trampil 0.1500 org 75,000.00 11,250.00 Kep. Tukang batu 0.0150 org 95,000.00 1,425.00 Mandor 0.0100 org 100,000.00 1,000.00 Jumlah 37,129.16

Page 161: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 161+29

1 2 3 4 5 6 = ( 3 x 5 )A129 1 M2 PAS. ONDERLAG BATU BELAH T = 20 CM

Pasir pasang 0.1500 m³ 118,200.00 17,730.00 Batu Belah 0.2500 m³ 154,500.00 38,625.00 Pekerja Trampil (Gali + Urug + Ampar) 0.1500 org 70,000.00 10,500.00 Peralatan 0.1200 lot 66,855.00 8,022.60 Jumlah 74,877.60

A130 1 M2 AMPARAN BATU PECAH MESIN 5/7 t=10 cmBatu Pecah Mesin 5/7 0.1200 m³ 218,200.00 26,184.00 Pekerja Trampil (Gali + Urug + Ampar) 0.1100 org 70,000.00 7,700.00 Peralatan 0.3200 lot 33,884.00 10,842.88 Jumlah 44,726.88

A131 1 M2 AMPARAN BATU PECAH MESIN 2/3 t=5 cmBatu Pecah Mesin 2/3 0.0600 m³ 272,700.00 16,362.00 Pekerja Trampil (Gali + Urug + Ampar) 0.0800 org 70,000.00 5,600.00 Peralatan 0.5000 lot 21,962.00 10,981.00 Jumlah 32,943.00

A132 1 M2 LAPISAN PENGISI /PENUTUPBatu pecah mesin 1/2 0.0120 m³ 290,900.00 3,490.80 Pasir Beton 0.0100 m³ 136,400.00 1,364.00 Pekerja Trampil (Gali + Urug + Ampar) 0.0500 org 70,000.00 3,500.00 Peralatan 0.9500 lot 8,354.80 7,937.06 Jumlah 16,291.86

A133 1 M2 PENGASPALAN MANUAL Batu abu /pasir beton 0.0050 m³ 136,400.00 682.00 Aspal 4.0000 kg 5,100.00 20,400.00 Kayu Bakar 0.0300 m³ 69,200.00 2,076.00 Pekerja Trampil (Mengaspal) 0.0600 org 70,000.00 4,200.00 Peralatan 0.1800 lot 27,358.00 4,924.44 Jumlah 32,282.44

A133 Rob 1 M2 PENGASPALAN MANUAL Batu abu /pasir beton 0.0050 m³ 136,400.00 682.00 Aspal 1.5000 kg 5,100.00 7,650.00 Kayu Bakar 0.0300 m³ 69,200.00 2,076.00 Pekerja Trampil (Mengaspal) 0.0600 org 70,000.00 4,200.00 Peralatan 0.1800 lot 27,358.00 4,924.44 Jumlah 19,532.44

A134 1 M2 HOTMIX TANGAN T=3 cm (JADI) u/ HAL & JALAN KLS 6 TON KE BAWAHAbu batu 0.0360 m³ 236,400.00 8,510.40 Aspal Panas 5.0000 kg 5,100.00 25,500.00 Kayu Bakar 0.0080 m³ 69,200.00 553.60 Pekerja Setengah Trampil 0.0800 org 65,000.00 5,200.00 Pekerja Trampil 0.0300 org 70,000.00 2,100.00 Mandor 0.0100 org 100,000.00 1,000.00 Peralatan 0.0980 lot 42,864.00 4,200.67 Jumlah 47,064.67

A135 1 M2 HOTMIX PAKAI ALAT BESAR T=5 cm KLS JALAN 8 TON LEBIHHotmix jadi + alat besar, tenaga & bhn bakar 0.1110 ton 546,000.00 60,606.00 Pekerja Trampil 0.0300 org 70,000.00 2,100.00 Mandor 0.0150 org 100,000.00 1,500.00 Jumlah 64,206.00

Page 162: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 162+29

1 2 3 4 5 6 = ( 3 x 5 )A136 1 M2 KONSTRUKSI PENETRASI LENGKAP

Amparan 5/7 T = 10 cm, digilas 1.0000 m² 19,097.00 19,097.00 Amparan 2/3 T = 5 cm, digilas 1.0000 m² 10,666.65 10,666.65 Lapisan Pengisi 1.0000 m² 2,322.50 2,322.50 Lapisan Aspal 1.0000 m² 5,747.00 5,747.00 Jumlah 37,833.15

900.02.1 1M' PEMASANGAN PIPA PVC MELALUI GALIAN (TIDAK TERMASUK HARGA PIPA)Urugan Pasir 0.0830 m3 130,000.00 10,790.00 Urugan Tanah Dipadatkan 0.2650 m3 #REF! #REF!Galian Tanah Biasa 0.3480 m3 33,600.00 11,692.80 Buangan Sisa Galian 0.0830 m3 9,200.00 763.60 Penyambungan Pipa 1.0000 ls 1,000.00 1,000.00 Jumlah #REF!

G.50.Crob 1 M2 SIARAN 1 PC : 2 PSR ( BID. PENGAIRAN ) PC. (50 kg ) 0.0703 zak 90,900.00 6,387.54 Pasir Pasang 0.0085 m3 118,200.00 1,004.70 Tukang Batu 0.1200 org 90,000.00 10,800.00 Kepala Tukang Batu 0.0120 org 95,000.00 1,140.00 Pekerja 0.3600 org 60,000.00 21,600.00 Mandor 0.0180 org 100,000.00 1,800.00 Jumlah 42,732.24

A1 1 M3 PEK. GALIAN TANAH BIASA BASAH ( BID.PENGAIRAN )Pekerja 0.7500 org 60,000.00 45,000.00 Mandor 0.0250 org 100,000.00 2,500.00 Jumlah 47,500.00

A3 1 M3 PEK. GALIAN TANAH YANG BANYAK TERDAPAT BATU BUNDAR ( BID. PENGAIRAN )Pekerja 1.5000 org 60,000.00 90,000.00 Mandor 0.0330 org 100,000.00 3,300.00 Jumlah 93,300.00

G. 43 b. BETON CYCLOOP 1 : 3 : 5 ( BID. PENGAIRAN )Batu Belah 0.7690 m3 - Kerikil Beton 0.5571 m3 - Pasir Beton 0.3343 m3 - P.C. (50 kg) 2.7855 zak - Tukang Batu Setengah Terampil 1.0000 org - Kepala Tukang Batu 0.1000 org - Pekerja 6.0000 org - Mandor 0.3000 org - Jumlah -

G. 41 1 M3 COR BETON BERTULANG 1 PC : 2 PASIR BETON : 3 KORAL BETON ( BID. PENGAIRAN )Batu Kerikil Beton 0.8200 m3 - Pasir Beton 0.5400 m3 - P.C. (50 kg) 6.8000 m3 - Tukang Batu 1.0000 zak - Kepala Tukang Batu 0.1000 org - Pekerja 6.0000 org - Mandor 0.3000 org - Jumlah -

Page 163: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 163+29

1 2 3 4 5 6 = ( 3 x 5 )F.8' 1 M2 CETAKAN BETON (BID. PENGAIRAN )

Tukang Kayu 0.5000 org - Kepala Tukang Kayu 0.0500 org - Pekerjan 0.2000 org - Mandor 0.0100 org - Paku 0.4000 kg - Kayu Gergajian 0.0400 m3 - 1 M3 BETON MEMERLUKAN 10 M2 CETAKAN 10 x f.8 = Rp. …………………………………….. Membongkar dan menyiram beton : Pekerja 4.0000 org - Jumlah -

G. 32.K 1 M3 PASANGAN BATU PAHAT / CANDI 30 X 30 X 30 CM, 1PC : 2 PSR ( BBID. PENGAIRAN )Batu Candi/Pahat 37.0000 bh - P.C. (50 kg) 4.2320 zak - Pasir Pasang 0.4275 m3 - Tukang Batu 1.2000 org - Kepala Tukang Batu 0.1200 org - Pekerja 0.3600 org - Mandor 0.0180 org - Jumlah -

G. 32.I 1 M3 PASANGAN BATU PAHAT / CANDI 30 X 30 X 30 CM, 1PC : 3 PSR ( BID. PENGAIRAN )Batu Candi/Pahat 37.0000 bh - P.C. (50 kg) 3.2000 zak - Pasir Pasang 0.4560 m3 - Tukang Batu 1.2000 org - Kepala Tukang Batu 0.1200 org - Pekerja 0.3600 org - Mandor 0.0180 org - Jumlah -

G.5.a BRONJONG KAWAT DIGALVANO UNTUK DIISI DENGAN BATU (1 X 1 X 3 m )DIISI BATU UNTUK TIAP 3 M3 ( 2 SEKAT LUAS PERMUKAAAN BRONJONG = 16 M3 ) DIA. 3 MMBatu Kali 3.0000 m3 - Kawat Bronjong 3 mm 28.5700 kg - Pekerja Penganyam 1.6000 org - Penganyam 2.0000 org - Mandor Penganyam 0.0800 org - Pekerjan Pengisi 4.5000 org - Mandor Pengisi 0.0750 org - Jumlah -

G.5.b BRONJONG KAWAT DIGALVANO UNTUK DIISI DENGAN BATU (1 X 1 X 3 m )DIISI BATU UNTUK TIAP 3 M3 ( 2 SEKAT LUAS PERMUKAAAN BRONJONG = 16 M3 ) DIA. 4 MMBatu Kali 3.0000 m3 - Kawat Bronjong 3 mm 42.3500 kg - Pekerja Penganyam 1.8000 org - Penganyam 2.2000 org - Mandor Penganyam 0.0800 org - Pekerjan Pengisi 4.5000 org - Mandor Pengisi 0.0750 org - Jumlah -

Page 164: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 164+29

1 2 3 4 5 6 = ( 3 x 5 )G.5.a.R. BRONJONG UKURAN (0,5 X 1 X 2 ) UNTUK DIA. 3 MM ( 7,5 M2) 1 SEKAT

Batu Kali 1.0000 m3 - Kawat Bronjong 3 mm 13.3900 kg - Pekerja Penganyam 0.7500 org - Penganyam 0.9400 org - Mandor Penganyam 0.0400 org - Pekerjan Pengisi 2.1100 org - Mandor Pengisi 0.0400 org - Jumlah -

G.5.b.R. BRONJONG UKURAN (0,5 X 1 X 2 ) UNTUK DIA. 4 MM ( 7,5 M2) 1 SEKAT Batu Kali 1.0000 m3 - Kawat Bronjong 3 mm 19.8500 kg - Pekerja Penganyam 0.7900 org - Penganyam 0.9700 org - Mandor Penganyam 0.0400 org - Pekerjan Pengisi 1.9900 org - Mandor Pengisi 0.0300 org - Jumlah -

G.5.a.R. BRONJONG UKURAN (0,5 X 1 X 2 ) UNTUK DIA. 3 MM ( 11,0 M2) 1 SEKAT Batu Kali 1.5000 m3 - Kawat Bronjong 3 mm 19.6400 kg - Pekerja Penganyam 1.1000 org - Penganyam 1.3800 org - Mandor Penganyam 0.0600 org - Pekerjan Pengisi 3.0900 org - Mandor Pengisi 0.0500 org - Jumlah -

G.5.b.R. BRONJONG UKURAN (0,5 X 1 X 2 ) UNTUK DIA. 3 MM ( 11,0 M2) 1 SEKAT Batu Kali 1.5000 m3 - Kawat Bronjong 3 mm 29.1200 kg - Pekerja Penganyam 1.2400 org - Penganyam 1.5100 org - Mandor Penganyam 0.0600 org - Pekerjan Pengisi 3.0900 org - Mandor Pengisi 0.0500 org - Jumlah -

B2 ONGKOS ANGKUT 10 M2 LEMPENGEN TEMPEL ( BID. PENGAIRAN )Angkutan 10 m2 lempengan = angkutan 1 m3 galian Tidak lebih dari 30 m1 :Pekerja 0.0330 org - Mandor 0.0010 org -

Jumlah - B5 MENANAM 1 M1 PAGAR HIDUP ( BID. PENGAIRAN )

Buah Stek 10.0000 bh - Pekerja 0.1000 orgMandor 0.0050 org Jumlah -

B6 MENANAM 1 BATANG TANAMAN BERIKUT PELINDUNGNYA ( BID. PENGAIRAN ) Batang Tanaman 1.0000 bh - Bambu Tali 1.0000 bh - Pekerja 0.4000 org - Mandor 0.0050 org - Jumlah -

E 13 1 M1 TIANG DIPANCANGKAN KE DALAM TANAH LUNAK ( BID. PENGAIRAN ) Tukang Kayu 0.0400 org - Kepala Tukang 0.0040 org - Pekerja 1.8000 org - Mandor 0.0430 org - Untuk tanah biasa dihitung = 1, 25 x analis E. 13 Untuk tanah biasa dihitung = 1, 50x analis E. 13 Untuk tanah biasa dihitung = 2, 00 x analis E. 13 Jumlah -

E 14 1 M1 TIANG DIPANCANGKAN KE DALAM TANAH LUNAK ( BID. PENGAIRAN ) ( Bila perancah dipancangkan diatas rakit )Tukang Kayu 0.0600 org - Kepala Tukang 0.0060 org - Pekerja 3.0000 org - Mandor 0.0750 org - Jumlah -

E 17' 1 M1 PAPAN PENAHAN DIPANCANGKAN KE DALAM TANAH LUNAK ( BID.PENGAIRAN ) Tukang Kayu 0.0800 org - Kepala Tukang 0.0080 org - Pekerja 1.0000 org -

Lebih dari 30 m' : aLk

: Upah Pekerja Setempat ( rupiah ) : Jarak angkut dalam m1: Harga angkutan per m3 ( Termasuk harga bahan dan peralatan angkut: bambu, dll)

Page 165: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 165+29

1 2 3 4 5 6 = ( 3 x 5 )Mandor 0.0250 org - Untuk tanah biasa dihitung = 1, 25 x analis E. 13 Untuk tanah biasa dihitung = 1, 50x analis E. 13 Untuk tanah biasa dihitung = 2, 00 x analis E. 13 Jumlah -

E17 MENCABUT TIANG PEMANCANG DARI DALAM TANAH ( BID. PENGAIRAN ) Tukang Kayu 0.3500 org - Kepala Tukang 0.0350 org - Pekerja 5.0000 org - Mandor 0.2500 org - Jumlah -

F3 1 M1 MEMBUAT SENDERAN BALOK PEMIKUL & BALOK AIR ( BID. PENGAIRAN )Tukang Kayu 24.0000 org - Kepala Tukang 2.4000 org - Pekerja 8.0000 org - Mandor 0.4000 org - Jumlah -

F4 1 M1 MEMASANG BALOK PENGGANTUNG & PENARIK S.D 15 M1 ( BID. PENGAIRAN )Tukang Kayu 36.0000 org - Kepala Tukang 3.6000 org - Pekerja 1.2000 org - Mandor 0.6000 org - Jumlah -

F5 100 KG MEMASANG GELAGAR BESI ( BID. PENGAIRAN )Tukang Kayu 0.1000 org - Kepala Tukang 0.0100 org - Pekerja 0.5000 org - Mandor 0.0250 org - Jumlah -

Page 166: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 166+29

1 2 3 4 5 6 = ( 3 x 5 )F7 100 KG MENURUNKAN GELAGAR BESI ( BID. PENGAIRAN )

Pekerja 0.5000 org - Mandor 0.0250 org - Jumlah -

F18 1 M2 MENGERJAKAN LANTAI JEMBATAN ( BID. PENGAIRAN )Tukang Kayu 0.5000 org - Kepala Tukang 0.0500 org - Pekerja 0.2000 org - Mandor 0.0100 org - Upah menggergaji 1.2000 m2 - Paku (Lantai Bawah ) atau 0.7500 kg - Paku 0.4000 kg - Jumlah -

G3 1 M2 PASANGAN BATU KOSONG TEBAL = 0,25 M SEBELAH LUAR DISIAR DENGAN PEREKAT Batu Kecil 0.2750 m3 - PC. (50 kg ) 0.0760 zak - Pasir 0.0080 m3 - Tukang Batu 0.0800 org - Kepala Tukang 0.0080 org - Pekerja 0.6150 org - Mandor 0.0310 org - Jumlah -

G4 1 M2 MEMASANG BATU PADA BENDUNG CURAHAN SALURAN MIRING DST. SETEBAL 0,23 M1Batu Kali 0.2500 m3 - Kerikil 0.0200 m3 - Pekerja 0.8000 org - Mandor 0.0400 org - Jumlah -

G.50.I 1 M2 PLESTERAN 1 PC : 3 PSR ( TEBAL 15 MM ) PC. (50 kg ) 0.1304 zak - Pasir Pasang 0.0194 m3 - Tukang Batu 0.2000 org - Kepala Tukang Batu 0.0200 org - Pekerja 0.4000 org - Mandor 0.0200 org - Jumlah -

G.50.J 1 M2 PLESTERAN 1 PC : 3 PSR ( TEBAL 10 MM ) PC. (50 kg ) 0.0864 zak - Pasir Pasang 0.0130 m3 - Tukang Batu 0.1500 org - Kepala Tukang Batu 0.0150 org - Pekerja 0.4000 org - Mandor 0.0200 org - Jumlah -

G.50.C 1 M2 SIARAN 1 PC : 2 PSR ( BID. PENGAIRAN ) PC. (50 kg ) 0.1054 zak 90,900.00 9,580.86 Pasir Pasang 0.0085 m3 118,200.00 1,004.70 Tukang Batu 0.1200 org 90,000.00 10,800.00 Kepala Tukang Batu 0.0120 org 95,000.00 1,140.00 Pekerja 0.3600 org 60,000.00 21,600.00 Mandor 0.0180 org 100,000.00 1,800.00 Jumlah 45,925.56

Page 167: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 167+29

1 2 3 4 5 6 = ( 3 x 5 )L.3 1 M2 BONGKARAN PASANGAN ( BID. PENGAIRAN )

Pekerja 4.0000 org - Mandor 0.4000 org - Jumlah -

L.4 1 M2 BONGKARAN PASANGAN (TEBAL 30 MM ) ( BID. PENGAIRAN ) Pekerja 2.0000 org - Mandor 0.1000 org - Jumlah -

L.2 PEMBESIAN UNTUK SETIAP 100 KGBesi Beton 110.0000 kg - Kawat beton 2.0000 kg -

Jumlah - M.01

7.5000 btg - Paku 12 cm 0.5600 kg -

2.8000 kg - Tukang Kayu 1.2000 org - Kepala Tukang Kayu 0.1200 org - Pekerja 4.8000 org - Mandor 0.0120 org - Alat Bantu 0.0100 ls - - Jumlah -

M.02 18.0000 btg -

Paku 12 cm 1.1200 kg - 5.6000 kg -

Tukang Kayu 1.4000 org - Kepala Tukang Kayu 0.1400 org - Pekerja 5.3000 org - Mandor 0.0140 org - Alat Bantu 0.0100 ls - - Jumlah -

M.03 28.5000 btg -

Paku 12 cm 1.6800 kg - 8.4000 kg -

Tukang Kayu 1.7000 org - Kepala Tukang Kayu 7.0000 org - Pekerja 5.9000 org - Mandor 0.0170 org - Alat Bantu 0.0100 ls - - Jumlah -

M.04 39.0000 btg -

Paku 12 cm 1.6800 kg - 11.2000 kg -

Tukang Kayu 2.1000 org - Kepala Tukang Kayu 0.2100 org - Pekerja 6.3000 org - Mandor 0.0210 org - Alat Bantu 0.0100 ls - - Jumlah -

1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 3M' ( ASUMSI LEBAR JEMBATAN 3M' & TANPA TIANG) Kayu Bulat f 30 cm

Pasak Besi f 12 mm

1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 6M' ( ASUMSI LEBAR JEMBATAN 3M' & DENGAN TIANG) Kayu Bulat f 30 cm

Pasak Besi f 12 mm

1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 9M' ( ASUMSI LEBAR JEMBATAN 3M' & DENGAN TIANG) Kayu Bulat f 30 cm

Pasak Besi f 12 mm

1 M' JEMBATAN SEMENTARA KAYU BULAT f 30 CM PANJANG 12M' ( ASUMSI LEBAR JEMBATAN 3M' & DENGAN TIANG) Kayu Bulat f 30 cm

Pasak Besi f 12 mm

1 m3 Beton memerlukan = …………. (bb) ……………..kg (Hasil Perhitungan )

(bb) kg besi beton Rp. ……………………………………………..

Page 168: RAB Reza.xlsx

Analisa Satuan Pekerjaan

Daftar Analisa TARKIM Halaman : 168+29

1 2 3 4 5 6 = ( 3 x 5 )A7.R. UPAH ANGKUTAN 1 ZAK SEMEN PC ( BID. PENGAIRAN )

Jumlah - A6 ONGKOS ANGKUT 1 M3 TANAH ( BID. PENGAIRAN )

Sejauh 30 meter Pekerja 0.3300 orgMandor 0.0100 orgLebih dari 30 meter

Jumlah -

1 zak PC = 50 kg = 40 liter = 0.04 m3 = 1/25 m3maka setiap jarak : (1 / (275 / ( L + 75 ))) /25 x a

L = 10 m1 = 0,01236 x aL = 50 m1 = 0,01818 x aL = 100 m1 = 0,02545 x aL = 200 m1 = 0,04000 x aL = 300 m1 = 0,05454 x a

Ket. : L = Jarak angkut dalam m1 a = Upah pekerja setempat ( Rupiah )

k = a /275 ( L + 75 )

a = Upah Pekerja Setempat (rupiah )L = Jarak angkut dalam m1k = Harga angkutan per m3 (termasuk harga bahan dan peralatan angkut, bambu, dll)

Page 169: RAB Reza.xlsx

Satuan Upah

Daftar Analis TARKIM Halaman : 169

DAFTAR SATUAN UPAH PEKERJA

NO. JENIS PEKERJA BANGUNAN HARGA UPAH SATUAN WAKTURp.

1 PEKERJA 60,000 1 ORANG/ HR/ 8 JAM

2 PEKERJA SETENGAH TERAMPIL 65,000 1 ORANG/ HR/ 8 JAM

3 PEKERJA TERAMPIL 70,000 1 ORANG/ HR/ 8 JAM

4 TUKANG GALI 70,000 1 ORANG/ HR/ 8 JAM

5 TUKANG BATU SETENGAH TERAMPIL 75,000 1 ORANG/ HR/ 8 JAM

6 TUKANG BATU TERAMPIL 90,000 1 ORANG/ HR/ 8 JAM

7 KEPALA TUKANG BATU 95,000 1 ORANG/ HR/ 8 JAM

8 TUKANG KAYU SETENGAH TERAMPIL 75,000 1 ORANG/ HR/ 8 JAM

9 TUKANG KAYU TERAMPIL 90,000 1 ORANG/ HR/ 8 JAM

10 KEPALA TUKANG KAYU 95,000 1 ORANG/ HR/ 8 JAM

11 TUKANG CAT / PELITUR SETENGAH TERAMPIL 75,000 1 ORANG/ HR/ 8 JAM

12 TUKANG CAT / PELITUR TERAMPIL 90,000 1 ORANG/ HR/ 8 JAM

13 KEPALA TUKANG CAT / PELITUR 95,000 1 ORANG/ HR/ 8 JAM

14 TUKANG BESI BETON SETENGAH TERAMPIL 75,000 1 ORANG/ HR/ 8 JAM

15 TUKANG BESI BETON TERAMPIL 90,000 1 ORANG/ HR/ 8 JAM

16 KEPALA TUKANG BESI BETON 95,000 1 ORANG/ HR/ 8 JAM

17 TUKANG BESI PROFIL SETENGAH TERAMPIL 75,000 1 ORANG/ HR/ 8 JAM

18 TUKANG BESI PROFIL TERAMPIL 90,000 1 ORANG/ HR/ 8 JAM

19 KEPALA TUKANG BESI PROFIL 95,000 1 ORANG/ HR/ 8 JAM

20 MANDOR 100,000 1 ORANG/ HR/ 8 JAM

21 OPERATOR MEKANIK 90,000 1 ORANG/ HR/ 8 JAM

22 PEMBANTU OPERATOR / MEKANIK 60,000 1 ORANG/ HR/ 8 JAM

23 OPERATOR ALAT BERAT TERLATIH 125,000 1 ORANG/ HR/ 8 JAM

24 SUPIR TRUK 90,000 1 ORANG/ HR/ 8 JAM

25 KENEK TRUK 70,000 1 ORANG/ HR/ 8 JAM

26 PENJAGA MALAM 75,000 1 ORANG/ HR/ 8 JAM

27 TUKANG ASPAL 70,000 1 ORANG/ HR/ 8 JAM

28 BURUH LAPANGAN TAK TERLATIH 60,000 1 ORANG/ HR/ 8 JAM

29 BURUH LAPANGAN KURANG TERLATIH 65,000 1 ORANG/ HR/ 8 JAM

30 BURUH LAPANGAN TERLATIH 70,000 1 ORANG/ HR/ 8 JAM

Page 170: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 170+1

DAFTAR SATUAN HARGA BAHAN KABUPATEN BENGKALIS

TAHUN 2015

NO. JENIS BAHAN BANGUNAN SAT HARGA SAT.

Rp.

1 2 3 4

A AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA

1 Pasir Urug m³ 100,000.00

2 Sirtu m³ 148,900.00

3 Pasir Teras m³ 141,800.00

4 Pasir Pasang Kali m³ 118,200.00

5 Pasir Beton m³ 136,400.00

6 Abu Batu / Screen m³ 236,400.00

7 Batu Gosok ( Apung ) kg 17,700.00

8 Screen m³ 236,400.00

9 Batu Pecah Mesin 1/2 m³ 290,900.00

10 Batu Pecah Mesin 2/3 m³ 272,700.00

11 Batu Pecah Mesin 3/5 m³ 263,600.00

12 Batu Pecah Mesin 5/7 m³ 218,200.00

13 Batu Pecah Mesin 7/10 m³ 209,100.00

14 Batu Pecah Mesin 10/15 m³ 181,800.00

15 Batu Belah Pondasi 15/20 m³ 154,500.00

16 Batu Bronjol ( Untuk Bronjong ) m³ 141,800.00

17 Batu Koral Beton Kali ( Pecah Tangan ) m³ 228,200.00

18 Batu Tempel Hitam m² 212,700.00

19 Batu Pinggir Beton 10 x 20 x 35 bh 23,600.00

20 Batu Pinggir Beton 15 x 35 x 50 ( K -225 ) bh 50,000.00

21 Batu Telor m³ 165,500.00

22 Batako kecil 8 x 10 x 20 bh 1,900.00

23 Batako Besar 8 x 20 x 30 bh 5,000.00

24 Con Blok 8 x 20 x 40 (Holowblock) bh 4,700.00

25 Bata Merah Bakar Kelas I bh 500.00

26 Bata Merah Bakar Kelas II bh 400.00

27 Bata Merah Oven bh 4,300.00

28 Roster Beton 20 x 20 bh 6,500.00

29 Roster Beton 30 x 30 bh 9,500.00

30 Grass Blok 20 x 20 bh 26,400.00

31 Grass Blok 30 x 30 bh 31,800.00

32 Paving Blok Natural bh 1,400.00

33 Paving Blok Warna bh 1,500.00

34 Paving Blok Natural 6 cm m² 47,300.00

Page 171: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 171+1

1 2 3 4

35 Paving Blok Warna 6 cm m² 52,000.00

36 Paving Blok Natural 8 cm m² 49,100.00

37 bh 1,400.00

38 b. Bentuk Tiga Berlian (1m2 = 50 bh) bh 1,200.00

39 c. Bentuk Segi Panjang (1m2 = 50 bh) bh 1,200.00

40 Paving Blok Warna 8 cm m² 54,500.00

41 Paving Blok Biasa bh 1,400.00

42 Kanstin Paving Blok bh 49,600.00

43 Semen PC Tiga Roda / 50 kg *M080 zak 90,900.00

44 Semen PC Tiga Roda Kg 1,800.00

45 Semen Putih zak 124,100.00

46 Kanstin Jalan ukuran Besar ( bina Marga ) 1 bh = 60 cm bh 49,600.00

47 Readymix Beton K 300, tanpa pompa ( selang ) m³ 1,229,100.00

48 Readymix Beton K 225, tanpa pompa ( selang ) m³ 1,040,000.00

49 Readymix Beton K 175, tanpa pompa ( selang ) m³ 898,200.00

50 Kapur Pasang/ kapur tembok m³ 161,300.00

51 Kapur Sirih kg 1,500.00

52 Semen Warna kg 9,100.00

53 Tanah Liat m³ 52,700.00

54 Tanah Urug (dilokasi) m³ 11,800.00

55 Rumput m² 12,500.00

56 Hollow Block 20 bh 3,200.00

57 Hollow Block 15 bh 2,900.00

58 Hollow Block 10 bh 2,400.00

59 Roster Terawang Keramik bh 40,000.00

60 Batu Candi m2 172,700.00

61 Batu Sikat 0,5 / 2 cm m2 72,700.00

B BAHAN FINISHING :

LABURAN, PENGISI DAN ALATNYA

1 Plamir Tembok kg 21,800.00

2 Cat Tembok ICI Eksterior ( BETON ) kg 49,600.00

3 Cat Tembok Kelas II Kg 12,700.00

4 Cat Tembok ICI Interior ( PLAFOND DAN DINDING ) lt 37,200.00

5 Cat Tembok Vinilex kg 20,900.00

6 Cat Dasar ICI untuk Interior ( 2 Pelapis ) lt 120,500.00

7 Cat Tembok Sanlex kg 14,500.00

8 Cat Tahan Asam kg 57,900.00

9 Cat Berkilat/Cat kayu kg 69,100.00

10 Cat Jembatan *M090 kg 81,500.00

11 Plamir Kayu kg 20,000.00

12 Pelapis Alkali ICI ( Cat Dasar Beton Ekterior ) lt 63,600.00

13 Cat Marka / Spotlight kg 161,300.00

14 Water Profing Emulsion kg 136,500.00

a. Bentuk Hexagonal (1m2 = 27 bh)

Page 172: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 172+1

1 2 3 4

15 Water Profing Membrance ml 104,200.00

16 Rool Cat Tembok bh 37,200.00

17 Kape Tembok bh 12,400.00

18 Kape Kayu bh 9,100.00

19 Soligneum 1 blek 5 lt 82,700.00

20 Plincote kg 47,300.00

21 Pengawetan Kayu m³ 63,600.00

22 Pengopenan Kayu m³ 868,600.00

23 Kwas 3" bh 17,700.00

24 Kwas 2' bh 11,800.00

25 Oker kg 52,700.00

26 Oyan bks 5,000.00

27 Oten (Pewarna Plitur ) bks 5,000.00

28 Spirtus lt 14,900.00

29 Bahan Plitur Kripik ( Sirlak India ) kg 29,100.00

30 Dempul Lilin kg 31,800.00

31 Dempul Plitur kg 5,000.00

32 Dempul Halus / Imfra ( Wood Filler ) kg 49,600.00

33 Terpentin lt 7,100.00

34 Tiner A lt 20,100.00

35 Tiner B lt 30,000.00

36 Kumpon kg 29,500.00

37 Melamik kg 68,000.00

38 Impra kg 53,600.00

39 Dempul Plastik kg 55,500.00

40 Dempul Duco kg 43,600.00

41 Ampelas lbr 3,600.00

42 Dempul Kayu Cap Kucing kg 33,600.00

43 Meni Kayu / Besi kg 28,400.00

44 Meni Sincromat kg 36,400.00

45 Cat Kayu Sieve kg 80,000.00

46 Cat Besi Sieve kg 76,800.00

47 Cat Besi Duco Danaglos/ICI kg 99,300.00

48 Cat Bron kg 74,500.00

49 Sirlak kg 90,900.00

50 Lem Fox bh 23,600.00

C BAHAN KAYU BERIKUT BAHAN JADINYA

1 Bambu Biasa bt 9,500.00

2 Bambu Ø 5 s.d 7 bt 12,700.00

3 Bambu Ø 7 s.d 10 bt 22,700.00

4 Bambu Gombong bt 40,900.00

5 Papan Terentang m³ 1,727,300.00

6 Kayu Kamper Singkil / Kapur (K. Samarinda Klas II) m³ 10,636,400.00

Page 173: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 173+1

1 2 3 4

7 Kayu Lokal Kelas II m³ 3,545,500.00

8 Kayu Papan Lokal Kelas II m³ 4,018,200.00

9 Kayu Papan Kamper m³ 10,000,000.00

10 Kayu Balok Borneo Super m³ 5,909,100.00

11 Kayu Papan Borneo Super m³ 6,381,800.00

12 Kayu Balok Kamper m³ 9,927,300.00

13 Kayu Balok Kruing m³ 5,454,500.00

16 Kayu Balok Kamper Banjar m³ 8,909,100.00

17 Kayu Papan Kamper Banjar m³ 10,000,000.00

18 Kayu Balok Kamper Samarinda m³ 9,927,300.00

19 Kayu Papan Kamper Samarinda m³ 11,909,100.00

20 Kayu Balok Rasamala m³ 6,500,000.00

21 Kayu Balok jati m³ 12,409,100.00

22 Kayu Papan Jati m³ 14,227,300.00

28 Kayu Balok Albasiah m³ 2,000,000.00

29 Kayu Papan Albasia m³ 2,009,100.00

31 Kayu Papan Borneo m³ 4,963,600.00

32 Dolken 8 s/d 10 uk.4m' bt 106,400.00

33 Dolken 7 s/d 10 bt 47,300.00

34 List profil kamper 1 cm m1 3,600.00

35 List profil kamper 2 cm m1 4,400.00

36 List profil kamper 4 cm m1 7,300.00

37 List profil kamper 5 cm m1 8,000.00

38 List profil kamper 10 cm m1 49,600.00

39 Pegangan Tangga profil Jati m1 372,300.00

40 Pegangan Tangga profil Kamper m1 148,900.00

41 Kayu Reng 2/3 Borneo m1 2,400.00

42 Kayu Reng 2/3 Kamper Banjar m1 3,500.00

43 Kayu Reng 3/4 Kamper Banjar m1 5,200.00

44 Reng Kayu Kls II m1 1,400.00

45 List profil Kayu Lokal KLs II 4 cm m1 4,000.00

D BAHAN PENUTUP RANGKA PLAFOND

1 Bahan plafond Enternit 4 mm m² 15,400.00

2 Bahan plafond hardpleks 5 mm 120 x 240 lbr 164,000.00

3 Bahan plafond Asbes Semen 5 mm m² 13,000.00

4 Gypsum 120 x 240 t = 9 mm ex DN lbr 98,200.00

5 Gypsum 120 x 240 t = 9 mm ex Luar lbr 109,100.00

6 Acustik Amstrong 60 x 120 lbr 184,400.00

7 GRC 120 x 240 lbr 100,000.00

Page 174: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 174+1

1 2 3 4

E BAHAN KAYU LAPIS

1 Triplek 3 mm 120 x 240 lbr 91,700.00

2 Triplek 4 mm 120 x 240 lbr 106,600.00

3 Triplek 4 mm Ukuran Pintu lbr 63,400.00

4 Triplek 6 mm 120 x 240 lbr 188,000.00

5 Jabar Wood 4 mm lbr 120,000.00

6 Plywood 18 mm 120 x 240 lbr 410,500.00

7 Plywood 4 mm 120 x 240 lbr 154,500.00

8 Plywood 3 mm 120 x 240 lbr 90,900.00

9 Plywood 3 mm ukuran Pintu lbr 172,700.00

10 Plywood 4 mm ukuran Pintu lbr 190,900.00

11 Bilik Bambu ( tanpa kulit ) m² 8,700.00

12 Bilik Bambu ( dengan kulit ) m² 19,800.00

13 Bilik Bambu Hitam Variasi m² 27,200.00

14 Wall Paper ( kls menengah ) m² 66,900.00

15 Multiplek 9 mm 120 x 240 lbr 213,900.00

16 Multiplek 12 mm 120 x 240 lbr 285,300.00

17 Multiplek 18 mm 120 x 240 lbr 328,100.00

18 Play Wood 18 mm 120 x 240 lbr 410,500.00

19 Teak Wood 3 mm 120 x 240 lbr 155,100.00

20 Teak Wood 4 mm 120 x 240 lbr 168,700.00

21 Teak Wood 3 mm 120 x 240 Ukuran Pintu lbr 105,500.00

22 Teak Wood ukuran Pintu 4 mm lbr 156,900.00

23 Tacon ( tahan bakar ) m² 162,400.00

24 Supercon m² 86,700.00

25 Melamin 4 mm 120 x 240 lbr 114,200.00

26 Melamin TIK 4 mm lbr 315,300.00

27 Formika 120 x 240 lbr 291,200.00

28 Formika Ukuran Pintu lbr 170,900.00

F BAHAN LANTAI DAN PELAPIS DINDING

1 Tegel PC 20 x 20 bh 1,500.00

2 Plin Tegel PC 10 x 20 bh 1,900.00

3 Tegel PC 30 x 30 bh 5,000.00

4 Plin Tegel PC 15 x 30 bh 2,200.00

5 Tegel Warna 20 x 20 bh 1,600.00

6 Plin Tegel Warna 10 x 20 bh 4,300.00

7 Tegel Warna 30 x 30 bh 5,200.00

8 Ubin Keramik 30 x 30 cm KW 1 dus 70,900.00

9 Ubin Keramik 20 x 20 cm KW 1 dus 67,300.00

10 Plin Tegel Warna 15 x 30 bh 6,200.00

11 Tegel Wafel PC 20 x 20 bh 1,500.00

12 Tegel Wafel Warna 20 x 20 bh 1,600.00

13 Tegel Badak PC 30 x 30 bh 4,300.00

14 Poslin 11 x 11 Warna Standar DN m² 63,100.00

15 Poslin 11 x 11 Warna Khusus DN m² 73,100.00

16 Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos m² 72,700.00

Page 175: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 175+1

1 2 3 4

17 Keramik 10 x 20 KW I DN Corak / Warna / Anti Slip m² 81,800.00

18 Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip m² 81,800.00

19 Keramik 20 x 20 (KM) KWI DN Putih Polos m² 74,500.00

20 Keramik 20 x 25 Dinding KM KWI DN Corak m² 78,200.00

21 Keramik 30 x 30 KW I DN putih polos m² 74,500.00

22 Keramik 30 x 30 KW I DN Warna/Corak / Anti Slip m² 86,300.00

23 Granito Tile Esenssza 40 x 40 polis m² 521,200.00

24 Granito Tile Esenssza 40 x 40 un polis m² 372,300.00

25 Granito Tile Esenssza 60 x 60 polis m² 546,000.00

26 Granito Tile Esenssza 60 x 60 un polis m² 397,100.00

27 Keramik 40 x 40 cm dus 99,300.00

28 Keramik Mozaik 30 x 30 cm dus 114,200.00

29 Vinyl Lantai standar m² 38,300.00

30 Karpet Kelas Baik LN m² 1,106,000.00

31 Karpet Kelas Sedang LN m² 431,800.00

32 Stairnosing keramik 10/20 bh 14,900.00

33 Stairnosing fiber m' 26,500.00

34 Taraso Kerang 30 x 30 m² 39,700.00

35 Plin Taraso 10 x 30 bh 9,000.00

36 Granit Alam LN Ukuran Besar m² 2,903,600.00

37 Granit Alam LN Ukuran Kecil m² 2,233,600.00

38 Granit Alam DN Ukuran Besar m² 1,960,500.00

39 Granit Alam DN Ukuran Kecil m² 1,814,100.00

40 Marmer Alam Lampung Ukuran Besar m² 328,700.00

41 Marmer Alam Lampung Ukuran Kecil m² 223,300.00

42 Marmer Alam Citatah Ukuran Besar m² 868,500.00

43 Marmer Alam Citatah Ukuran Kecil m² 513,600.00

44 Marmer Sintetis m² 496,400.00

45 Bata Karawang bh 12,300.00

46 Campuran untuk Kedap Air (AM) ltr 44,900.00

47 Lantai Parket m² 581,800.00

48 Stepnozing m' 26,200.00

49 Plint Keramik 5/20 bh 10,000.00

50 Keramik Lantai Antislip sekualitas Romance KW I Warna 33x33 cm m2 109,100.00

51 Keramik Lantai sekualitas Romance KW I Warna 33x33 cm m2 100,000.00

G BAHAN SALURAN AIR KOTOR / BERSIH

1 Grafel 1/2 d.20 cm m1 36,400.00

2 Grafel 1/2 d.30 cm m1 54,500.00

3 Grafel 1/2 d.40 cm m1 72,700.00

4 Buis Beton Ø 20 cm ( 1 m' ) m1 72,700.00

5 Buis Beton Ø 30 cm ( 1 m' ) bh 109,100.00

6 Buis Beton Ø 40 cm ( 1 m' ) bh 145,500.00

7 Buis Beton Ø 50 cm ( 1 m' ) bh 181,800.00

Page 176: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 176+1

1 2 3 4

8 Buis Beton Ø 60 cm ( 1 m' ) *M031 bh 218,200.00

9 Buis Beton Ø 100 cm ( 0.50 m ) *M035 bh 363,600.00

10 Buis Beton Ø 80 cm ( 0.50 m ) *M033 bh 290,900.00

11 Buis Tanah Ø 10 cm ( 0.50 m ) bh 13,600.00

12 Buis Tanah Ø 15 cm ( 0.50 m ) bh 19,100.00

13 Buis Tanah Ø 20 cm ( 0.50 m ) bh 26,400.00

14 Buis Tanah Ø 25 cm ( 0.50 m ) bh 31,800.00

15 Injuk kg 21,800.00

H BAHAN LOGAM DAN BAHAN JADINYA

1 Besi Beton U-24 Rata - Rata *M167' kg 14,500.00

2 Besi Beton U-39 / U-32 Rata - Rata *M167 kg 16,400.00

3 Pagar BRC Lengkap Tiang ( Tanpa Pondasi ) m² 149,600.00

4 Bondek m² 200,900.00

5 Ongkos Galfanis Besi kg 10,000.00

6 Kawat Duri m1 4,300.00

7 Kawat Pengikat m1 9,500.00

8 Kawat Bronjong 4 mm kg 12,300.00

9 Kawat Tembaga kg 8,300.00

10 Baja Siku / Profil DN kg 16,300.00

11 Baja IWF DN SII kg 16,800.00

12 Baja IWF Jepang kg 19,800.00

13 Baja Kontruksi Jembatan *M165 kg 44,600.00

14 Kawat Beton *M168 kg 15,500.00

15 Kawat Bronjong 4 mm *M162 kg 11,800.00

16 Kawat Tembaga kg 8,200.00

17 Baut Baja *M163 kg 37,100.00

18 Besi Galvanisir * M164 kg 61,800.00

19 Baja Tralis *M161 kg 25,500.00

20 Ram Nyamuk Hijau m² 17,300.00

21 Ram Kawat 1 x 1 cm m² 17,300.00

22 Ram Ayam m² 18,200.00

23 Kawat Kasa 1 x 1 cm ( Putih ) m² 30,700.00

24 Kawat Harmonika 4 cm m² 39,000.00

25 Kawat Harmonika 2 cm m² 47,300.00

26 Kawat Las Listrik kg 37,100.00

27 Wiremesh M8 m² 56,700.00

28 Wiremesh M6 m² 46,400.00

29 Timah kg 58,200.00

30 Timah Hitam kg 37,100.00

31 Ram Nyamuk Aluminium m² 20,100.00

32 Plat Srip Ø 2 x 30 mm ( 6 m1) bt 37,100.00

33 Plat Srip Ø 3 x 30 mm ( 6 m1) bt 48,200.00

34 Plat Alumunium 0.2 mm m² 113,000.00

Page 177: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 177+1

1 2 3 4

35 Plat Alumunium 0.3 mm m² 146,700.00

36 Plat Alumunium 0.4 mm m² 176,100.00

37 Plat Alumunium 0.5 mm m² 198,500.00

38 Plat Alumunium 0.6 mm m² 229,700.00

39 Plat Alumunium 0.1 mm m² 61,000.00

40 Kusen Alumunium Natural 1.3 mm t=1,3 mm ( 4 " ) m1 227,300.00

41 Kusen Alumunium Warna 1.3 mm t=1,3 mm ( 4 " ) m1 236,400.00

42 Kusen Alumunium 4" CA m1 100,000.00

43 Daun Jendela Alumunium Natural ( Tanpa Kaca dan accessories ) m² 73,600.00

44 Daun Jendela Alumunium Warna ( Tanpa Kaca dan accessories ) m² 78,200.00

45 Daun Pintu Alumunium Natural ( tanpa kaca dan accessories ) m² 96,900.00

46 Daun Pintu Alumunium Warna ( tanpa kaca dan accessories ) m² 129,100.00

47 Handle Alumunium ( Tarikan Pintu Alumunium ) bh 124,100.00

48 Kait Angin alumunium ps 148,900.00

49 Karet Asisoris Kusen / Pintu Alumunium m1 7,300.00

50 Seng Plat BJLS 30 dia. 60 cm ( 100 m1 ) m1 39,700.00

51 Seng Plat BJLS 30 dia. 90 cm ( 100 m1 ) m1 49,600.00

52 Plat Besi Tipis 1 mm kg 17,300.00

53 Plat Besi Tipis 0.5 mm kg 18,500.00

54 Plat Besi 2 mm s/d 5 mm kg 14,900.00

55 Plat Besi 6 mm s/d 10 mm kg 14,900.00

56 Plat Besi 10 mm Ke atas kg 14,900.00

57 Lem Kuning (aibond) kg 66,900.00

58 Lem Fox kg 23,600.00

59 Pintu Besi Baja m2 727,300.00

60 Rolling door Besi m2 727,300.00

61 Pintu Aluminium m2 272,700.00

62 Pintu Swing 5mm unt 1,500,000.00

63 Pintu Swing 8mm unt 2,181,800.00

64 Teralis Besi strip m2 145,500.00

65 Besi Teralis m2 818,200.00

I BAHAN KACA

1 Kaca Polos 2 mm m² 58,200.00

2 Kaca Polos 3 mm m² 61,800.00

3 Kaca Polos 5 mm m² 69,100.00

4 Kaca Polos Tebal 8 mm m² 120,000.00

5 Kaca Polos Tebal 12 mm m² 127,300.00

6 Kaca Rayband 5 mm ( ASAHI ) m² 111,500.00

7 Kaca Rayband 8 mm ( ASAHI ) m² 496,400.00

8 Kaca Rayband 12 mm ( ASAHI ) m² 806,500.00

9 Kaca Patri Lokal Terpasang ( ASAHI ) m² 1,302,800.00

10 Kaca Patri EX Luar negeri terpasang m² 5,335,900.00

11 Kaca 6 mm Gravir m² 2,228,700.00

12 Glass Block DN 20 x 20 bh 36,600.00

13 Glass Block 20 x 20 Ex LN bh 124,100.00

Page 178: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 178+1

1 2 3 4

J BAHAN PAKU DAN MUR BAUT

1 Paku 3 cm kg 16,400.00

2 Paku 5 cm s/d 7 cm / Paku Reng - Usuk kg 16,400.00

3 Paku 8 cm s/d 12 cm kg 16,400.00

4 Paku 2 cm s/d 4 cm /Paku Tripleks - Bilik kg 17,300.00

5 Paku 1/2 cm s/d 1 cm /Paku seng-Plat Poil kg 17,800.00

6 Paku Baja Jembatan *M166 kg 25,500.00

7 Paku Beton 2 cm s/d 5 cm kg 27,300.00

8 Paku Kait Lengkap bh 1,200.00

9 Paku Cacing kg 22,700.00

10 Paku Seng Glb. / Paku Asbes Glb. kg 25,500.00

11 Paku Skrup kg 12,300.00

12 Besi Beugel kuda - kuda kg 17,300.00

13 Duk Angker kg 17,300.00

14 Angker Mur Baut dia.19 / panjang 60 cm bh 25,500.00

15 Mur Baut HTB dia. 19 s/d 16 (5 cm) bh 8,500.00

16 Mur Baut Biasa dia.19 s/d 16 (5 cm) bh 7,300.00

17 Piser dia. 12 s/d 20 cm bh 6,200.00

K BAHAN PERPIPAAN 1.²

1 Besi Pipa untuk Hydrant BSP Ø 1" bt 152,200.00

2 Besi Pipa untuk Hydrant BSP Ø 1,25" bt 160,700.00

3 Besi Pipa untuk Hydrant BSP Ø 1,5" bt 174,500.00

4 Besi Pipa untuk Hydrant BSP Ø 2" bt 202,400.00

5 Besi Pipa untuk Hydrant BSP Ø 2,5" bt 620,500.00

6 Besi Pipa untuk Hydrant BSP Ø 3" bt 857,300.00

7 Besi Pipa untuk Hydrant BSP Ø 4" bt 1,214,700.00

8 Besi Pipa untuk Hydrant BSP Ø 6" bt 2,010,300.00

9 Hydrant bh 381,800.00

10 Besi Pipa Hitam Ø 1" t=2 mm bt 135,200.00

11 Besi Pipa Hitam Ø 2" t=2 mm bt 243,200.00

12 Besi Pipa Hitam Ø 3" t=2 mm bt 434,200.00

13 Besi Pipa Hitam Ø 4" t=2 mm bt 558,200.00

14 Besi Pipa Hitam Ø 6" t=2 mm bt 744,500.00

15 Pipa GIP Medium A Ø 1/2" ( 6 m1 ) bt 127,300.00

16 Pipa GIP Medium A Ø 3/4" ( 6 m1 ) bt 155,100.00

17 Pipa GIP Medium A Ø 1" ( 6 m1 ) bt 230,500.00

18 Pipa GIP Medium A Ø 1 1/4" ( 6 m1 ) bt 299,500.00

19 Pipa GIP Medium A Ø 1 1/2" ( 6 m1 ) bt 356,700.00

20 Pipa GIP Medium A Ø 1 3/4"( 6 m1 ) bt 421,800.00

21 Pipa GIP Medium A Ø 2" ( 6 m1 ) bt 521,100.00

22 Pipa GIP Medium A Ø 2 1/2" ( 6 m1 ) bt 693,500.00

23 Pipa GIP Medium A Ø 3" ( 6 m1 ) bt 843,600.00

24 Pipa GIP Medium A Ø 4" ( 6 m1 ) bt 1,111,800.00

Page 179: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 179+1

1 2 3 4

25 Macam2 Sambungan GIP Ø 1/2" bh 7,300.00

26 Macam2 Sambungan GIP Ø 3/4" bh 9,500.00

27 Macam2 Sambungan GIP Ø 1" bh 14,900.00

28 Macam2 Sambungan GIP Ø 1 1/4" bh 18,200.00

29 Macam2 Sambungan GIP Ø 11/2" bh 20,900.00

30 Macam2 Sambungan GIP Ø 13/4" bh 31,300.00

31 Macam2 Sambungan GIP Ø 2" bh 43,300.00

32 Macam2 Sambungan GIP Ø 2 1/2" bh 61,800.00

33 Macam2 Sambungan GIP Ø 3" bh 74,500.00

34 Macam2 Sambungan GIP Ø 4" bh 86,700.00

35 Pipa PVC RUCIKA type AW Ø 1/2" bt 39,600.00

36 Pipa PVC RUCIKA type AW Ø 3/4" bt 55,800.00

37 Pipa PVC RUCIKA type AW Ø 1" bt 69,500.00

38 Pipa PVC RUCIKA type AW Ø 1 1/4" bt 96,700.00

39 Pipa PVC RUCIKA type AW Ø 1 1/2" bt 125,100.00

40 Pipa PVC RUCIKA type AW Ø 2" bt 171,100.00

41 Pipa PVC RUCIKA type AW Ø 2 1/2" bt 218,200.00

42 Pipa PVC RUCIKA type AW Ø 3" bt 327,600.00

43 Pipa PVC RUCIKA type AW Ø 4" bt 508,600.00

44 Pipa PVC RUCIKA type AW Ø 6" bt 980,200.00

45 Pipa PVC RUCIKA type AW Ø 8" bt 1,426,900.00

46 Pipa PVC MASPION ABU Ø 1/2" (AW) bt 23,200.00

47 Pipa PVC MASPION ABU Ø 3/4" (AW) bt 30,000.00

48 Pipa PVC MASPION ABU Ø 1" (AW) bt 40,900.00

49 Pipa PVC MASPION ABU Ø 1 1/4" (AW) bt 57,200.00

50 Pipa PVC MASPION ABU Ø 1 1/2" (AW) bt 73,500.00

51 Pipa PVC MASPION ABU Ø 2" (AW) bt 127,200.00

52 Pipa PVC MASPION ABU Ø 2 1/2" (AW) bt 152,500.00

53 Pipa PVC MASPION ABU Ø 3" (AW) bt 280,500.00

54 Pipa PVC MASPION ABU Ø 4" (AW) bt 372,300.00

55 Pipa PVC MASPION ABU Ø 6" (AW) bt 874,500.00

56 Pipa GI Diameter 0,5" bt 63,600.00

57 Pipa GI Diameter 0,75" bt 80,000.00

58 Pipa GI Diameter 1" bt 94,400.00

59 Pipa GI Diameter 1,25" bt 218,200.00

60 Pipa GI Diameter 1,5" bt 236,400.00

61 Pipa GI Diameter 2" bt 198,600.00

62 Pipa GI Diameter 2,5" bt 545,900.00

63 Pipa GI Diameter 3" bt 336,400.00

64 Pipa GI Diameter 4" bt 495,100.00

65 Knie PVC Diameter 0,5" bh 1,800.00

66 Knie PVC Diameter 0,75" bh 2,500.00

67 Knie PVC Diameter 1" bh 8,700.00

68 Knie PVC Diameter 2" bh 36,200.00

Page 180: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 180+1

1 2 3 4

69 Knie PVC Diameter 3" bh 65,300.00

70 Knie PVC Diameter 4" bh 148,500.00

71 Tee PVC Diameter 0,5" bh 2,500.00

72 Tee PVC Diameter 0,75" bh 3,300.00

73 Tee PVC Diameter 1" bh 6,500.00

74 Tee PVC Diameter 2" bh 7,800.00

75 Tee PVC Diameter 3" bh 10,800.00

76 Tee PVC Diameter 4" bh 1,600.00

77 Kran Diameter 0,5" bh 37,100.00

78 Fiet Kran Diameter 0,5" bh 58,200.00

79 Fiet Kran Diameter 0,75" bh 99,300.00

80 Fiet Kran Diameter 1" bh 166,400.00

81 Fiet Kran Diameter 2" bh 547,300.00

82 Fiet Kran Diameter 3" bh 1,265,000.00

83 Fiet Kran Diameter 4" bh 4,729,600.00

84 Macam2 Sambungan Paralon Ø 1/2" bh 9,800.00

85 Macam2 Sambungan Paralon Ø 3/4" bh 9,800.00

86 Macam2 Sambungan Paralon Ø 1" bh 27,100.00

87 Macam2 Sambungan Paralon Ø 1 1/4" bh 29,800.00

88 Macam2 Sambungan Paralon Ø 1 1/2" bh 29,800.00

89 Macam2 Sambungan Paralon Ø 1 3/4" bh 29,800.00

90 Macam2 Sambungan Paralon Ø 2" bh 30,900.00

91 Macam2 Samb. Paralon Ø 2 1/2" bh 30,900.00

92 Macam2 Samb. Paralon Ø 3" bh 74,500.00

93 Macam2 Samb. Paralon Ø 4" bh 86,900.00

94 Sambungan Pipa PVC Jenis AW 4 " TY bh 50,900.00

95 Lem Paralon bh 10,000.00

96 Solatip Leideng gl 3,500.00

97 Pipa PVC 4" berlobang jenis AW m1 48,400.00

L BAHAN SANITAIR

1 Stop Kran 1/2 " KIT bh 43,300.00

2 Stop Kran 3/4 " KIT bh 49,600.00

3 Stop Kran 1 " KIT bh 322,600.00

4 Stop Kran 1 1/2 " KIT bh 446,700.00

5 Stop Kran 2 " KIT bh 1,116,800.00

6 Stop Kran 2 1/2" KIT bh 1,265,700.00

7 Stop Kran 3 " KIT bh 111,500.00

8 Fiet kran 3/4" bh 99,300.00

9 Fiet kran 1" bh 129,100.00

10 Fiet kran 2" bh 363,600.00

11 Fiet kran 3" bh 784,200.00

12 Fiet kran 4" bh 1,295,500.00

13 Lem Paralon bh 9,800.00

Page 181: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 181+1

1 2 3 4

14 Double Neple 1/2 " bh 5,500.00

15 Water Mur 1/2 " bh 15,100.00

16 Gate Walve 1/2 " bh 61,800.00

17 Saringan Air Lt KM Stainless Steel bh 61,800.00

18 Apooer Bath Tube bh 356,400.00

19 Kran stain less Lokal Kait bh 65,500.00

20 Shower Dengan Tiang bh 334,900.00

21 Shower Tanpa Tiang bh 186,000.00

22 Kran Tembok Sun Eui dia. 1/2 " bh 124,100.00

23 Kran Tembok ITAP dia. 1/2 " bh 49,600.00

24 Kran Bebek Sun Eui 1/2 " bh 223,400.00

25 Kran Bebek ITAP 1/2 " bh 74,500.00

26 Kran Panas Dingin San Eui Standard bh 310,000.00

27 Bath Cape Washteren unit 2,970,500.00

28 Tempat Sabun Poslin bh 61,800.00

29 Wastafel Lengkap TOTO LW 230 unit 1,712,500.00

30 Wastafel Lengkap INA unit 930,500.00

31 Closet Duduk Poslin (INA) Lengkap set 3,102,300.00

32 Closet Jongkok Poslin (INA) bh 198,500.00

33 Closet Jongkok Teraso bh 109,700.00

34 Closet Jongkok Poslin warna TOTO unit 571,600.00

35 Closet Jongkok Standard Putih Poslin TOTO unit 273,000.00

36 Closet Jongkok Lengkap Sistem Jet TOTO unit 2,829,100.00

37 Closet Duduk Warna Standard TOTO C 240 Lengkap unit 2,605,500.00

38 Wastafel Bulat Warna Standard Lengkap unit 2,140,500.00

39 Closet Duduk Warna Standard lengkap INA bh 1,997,700.00

40 Urinoar Lengkap TOTO Warna Standard lengkap unit 2,320,400.00

41 Penyekat Poslin Urinoar TOTO lbr 625,500.00

42 Kitchen Zink Stainless Standard Lokal ( 1 Lobang ) bh 290,900.00

43 Kitchen Zink Stainless Non Standard Franke ( 1 Lobang ) bh 363,600.00

44 Kitchen Zink Stainless Non Standard Franke ( 2 Lobang ) bh 409,100.00

45 Selotip bh 2,400.00

46 Bak Mandi Teraso bh 370,900.00

47 Bak Mandi Fiber Glass 60 x 6 bh 173,600.00

48 Floordrain stainless bh 36,400.00

M BAHAN PENUTUP ATAP

1 Atap Plastik Gelombang 80 x 180 lbr 32,700.00

2 Atap Fiber Glass Tipis 80 x 180 (gelombang) lbr 59,100.00

3 Atap Fiber Glass Tebal 80 x 180 (gelombang) lbr 116,400.00

4 Atap Aluminium Natural USR 26 ( JAINDO ) m² 201,800.00

5 Atap Aluminium Warna USR 26 ( JAINDO ) m² 231,800.00

6 Atap Asbes Gel. Kecil 4 mm 80 x 180 lbr 65,500.00

7 Bubung Asbes lbr 40,000.00

Page 182: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 182+1

1 2 3 4

8 Atap Asbes Gel. 4 mm 90 x 180 lbr 72,700.00

9 Atap Asbes Gel. 5 mm 90 x 180 lbr 83,600.00

10 Atap Asbes Gel. Besar 5 mm 90 x 240 lbr 124,900.00

11 Atap Tegola Kubota, lengkap m² 704,700.00

13 Atap Tegola Kwalitas Sedang m² 363,600.00

14 Aluminium foile m² 10,900.00

15 Atap Genteng Plentong pres Bakar KW 1 bh 1,700.00

16 Atap Genteng Plentong pres Molen Oven KW1 bh 2,200.00

17 Atap Genteng Flam pres Molen Oven Jatiwangi bh 1,400.00

18 Genting Morando bh 2,900.00

19 Bubung Genteng pres Bulat Ex Jatiwangi bh 6,400.00

20 Genteng Bubungan Ex Jatiwangi Segi Tiga bh 5,100.00

21 Genteng Bubungan Beton bh 6,000.00

22 Genteng Beton Warna 14,5/m2 bh 9,600.00

23 Genteng Beton Natural bh 29,700.00

24 Genteng Metal ( Rainbow Roof ) m² 310,100.00

25 Genteng Metal Hana m² 225,000.00

26 Nok Atas Metal ( Rainbow Roof ) m1 203,300.00

27 Nok Atas Metal Hana m1 109,100.00

28 Nok Pinggir Metal ( Rainbow Roof ) m1 141,300.00

29 Nok Pinggir Hana m1 109,100.00

30 Wall Flashing ( Rainbow Roof ) m1 141,300.00

31 Wall Flashing Hana m1 109,100.00

32 Atap Genteng Beton Warna 14,5/m2 m² 128,900.00

33 Genteng Beton Natural m² 29,700.00

34 Sirap Kelas I ( 80 / m2 ) bh 1,400.00

35 Sirap m² 248,200.00

36 Genteng Keramik bh 11,100.00

37 Genteng Keramik Natural Intan 14,5 / m2 m² 141,800.00

38 Genteng Keramik Glasur Standard 14,5 / m2 m² 159,500.00

39 Genteng Keramik Glasur Special 14,5 / m2 m² 169,100.00

40 Genteng Keramik Glasur Premium 14,5 / m2 m² 190,300.00

41 Genteng Murando Natural 1m2 = 18 bh bh 3,000.00

42 Genteng Murando Glasur 1m2 = 20 bh bh 6,400.00

43 Genting Magas bh 1,900.00

44 Genteng Super Roof Multicolor m² 269,100.00

45 Bubung Murando Natural bh 5,100.00

46 Bubung Murando Glasur bh 12,500.00

47 Bubungan Genteng Keramik bh 12,100.00

48 Bubungan Genteng Palentong bh 2,900.00

49 Bubungan Genteng Murando bh 9,900.00

50 Bubungan asbes bh 37,100.00

51 Bubungan Genting Flam bh 3,100.00

52 Bubungan Genting Magas eks banjar bh 3,500.00

Page 183: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 183+1

1 2 3 4

53 Bubungan Genteng Super Roof Multicolor bh 109,800.00

54 Genteng Aspal bh -

55 Genteng Kodok bh 3,600.00

56 Bubungan Genteng Kodok bh 3,500.00

N BAHAN MEKANIKAL

1 Jockey Pump kap. 80 gln / menit 100 m1 ( 18,6 kW ) unit 47,775,000.00

2 Electrical Pump kap. 750 gln / menit 120 m1 ( 90 kW ) unit 163,800,000.00

3 Diesel Pump kap. 750 gln / menit 120 m1 ( 105 kW ) unit 409,500,000.00

4 Presure Tank kap. 500 liter lengkap unit 23,887,500.00

5 Hydran Box dalam Gedung (lengkap) unit 4,231,500.00

6 Fire House 1.5 x 30 m + nose unit 3,412,500.00

7 Exhouse Fan H 360 W 60 x 60 cm unit 4,777,500.00

8 Exhouse Fan H 380 W CFM 55 x 55 cm unit 4,231,500.00

9 Exhouse Fan H 100 W 40 x 40 cm unit 819,000.00

10 AC Split 3 PK Setara TOSHIBA unit 11,943,750.00

11 AC Split 2 PK Setara TOSHIBA unit 8,872,500.00

12 AC Split 1 PK Setara TOSHIBA unit 4,777,500.00

13 Mesin AC Split DAIKIN ( Indoor / Outdoor Unit ) 1 BTU 1,950.00

14 AC Split 1 PK Setara Canghong unit 3,500,000.00

15 AC Split 2 PK Setara Canghong unit 4,500,000.00

O BAHAN ELEKTRIKAL 1.5

1 Panel MCB Lt. 01 set Rp 750,000.00

1 Kabel NYA 1x 1.5 Prima (1 rol = 50 m') ROLL 74,300.00

2 Kabel NYA 1x 2.5 Prima (1 rol = 50 m') ROLL 118,900.00

3 Kabel NYM 2 x 1.5 Prima (1 rol = 50 m') m' 5,700.00

4 Kabel NYM 3 x 1.5 Prima (1 rol = 50 m') m' 7,100.00

5 Kabel NYM 2 x 2.5 Prima (1 rol = 50 m') m' 8,600.00

6 Kabel NYM 3 x 2.5 Prima (1 rol = 50 m') m' 7,400.00

7 Kabel NYM 4 x 2.5 Prima (1 rol = 50 m') m' 9,500.00

8 Kabel NYM 2 x 4 Prima (1 rol = 50 m') m' 10,300.00

9 Kabel NYM 3 x 4 Prima (1 rol = 50 m') m' 12,900.00

10 Kabel NYM 4 x 4 Prima (1 rol = 50 m') m' 13,700.00

11 Kabel NYM 2 x 6 Prima (1 rol = 50 m') m' 10,600.00

12 Kabel NYM 3 x 6 Prima (1 rol = 50 m') m' 14,600.00

13 Kabel NYM 4 x 6 Prima (1 rol = 50 m') m' 19,400.00

14 Kabel NYM 2 x 10 Prima (1 rol = 50 m') m' 18,800.00

15 Kabel NYM 3 x 10 Prima (1 rol = 50 m') m' 24,800.00

16 Kabel NYM 4 x 10 Prima (1 rol = 50 m') m' 31,700.00

18 Kabel NYY 2 x 4 Prima (1 rol = 50 m') m' 13,100.00

19 Kabel NYY 3 x 4 Prima (1 rol = 50 m') m' 11,200.00

20 Kabel NYY 4 x 4 Prima (1 rol = 50 m') m' 18,800.00

21 Kabel NYY 2 x 6 Prima (1 rol = 50 m') m' 13,100.00

22 Kabel NYY 3 x 6 Prima (1 rol = 50 m') m' 14,000.00

Page 184: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 184+1

1 2 3 4

23 Kabel NYY 4 x 6 Prima (1 rol = 50 m') m' 17,500.00

24 Kabel NYY 2 x 10 Prima (1 rol = 50 m') m' 15,100.00

25 Kabel NYY 3 x 10 Prima (1 rol = 50 m') m' 20,800.00

26 Kabel NYY 4 x 10 Prima (1 rol = 50 m') m' 25,400.00

27 Kabel NYY 4 x 16 Prima (1 rol = 50 m') m' 578,000.00

28 Kabel Tembaga Kg 52,000.00

29 Kabel Tik 2 10 mm m' 6,500.00

30 NSFB FUJI EA - 100 A bh 803,100.00

31 NSFB FUJI EA - 150 A bh 2,076,900.00

32 Rumah Panel 30 x 60 cm (kosong) unt 107,700.00

33 Skring Kas 2 grop Biasa unt 163,400.00

34 Skring Kas 3 grop Biasa unt 206,800.00

35 Skring Kas 5 grop Biasa unt 434,600.00

36 MCB Mercury bh 84,900.00

37 MCB 1 PAS bh 48,000.00

38 MCB 3 PAS bh 81,200.00

39 Tahanan 50 A Merk Fuji bh 489,200.00

40 Saklar Tunggal Biasa bh 5,500.00

41 Saklar Ganda Biasa bh 9,200.00

42 Saklar Magnet 25 PK bh 1,228,500.00

43 Saklar Broko Tunggal Standard ( 1 Phase ) bh 15,100.00

44 Saklar Broko Seri Standard ( 1 Phase ) bh 21,800.00

45 Stop Kontak Biasa bh 9,200.00

46 Stop Kontak Putar bh 30,400.00

47 Stop Kontak Broko Standard ( 1 Phase ) bh 21,500.00

48 Stop Kontak Broko 3 Phase ( Out Bow ) bh 84,000.00

49 Stop Kontak Broko 3 Phase ( In Bow ) bh 143,300.00

50 Stop Kontak Handle 3 Phase bh 86,900.00

51 Instalasi Titik Lampu / Stop Kontak ( Upah dan Alat ) ttk 94,600.00

52 Lampu pijar 25 Watt s/d 100 Watt bh 7,600.00

53 Lampu Neon TL Philip 20 W bh 16,900.00

54 Lampu Neon TL Philip 40 W bh 23,400.00

55 Trapo TL 20 W ( Philip ) bh 31,500.00

56 Trapo TL 40 W ( Philip ) bh 34,700.00

57 Trapo TL 20 W ( Sinar ) bh 32,900.00

58 Trapo TL 40 W ( Sinar ) bh 31,300.00

59 Trapo Ballas bh 371,300.00

60 Stater Neon Philip bh 5,300.00

61 Stater Neon Biasa bh 2,200.00

62 Rumah TL In Bow / Out Bow 2 x 20 W ( Kosongan ) bh 108,000.00

63 Down Light + SL 25 W bh 285,400.00

64 Lampu SL Philip 25 W bh 102,300.00

65 Lampu Sirkel TL 20 W Lengkap bh 65,400.00

66 Lampu Mercuri 80 W bh 132,300.00

Page 185: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 185+1

1 2 3 4

67 Lampu Mercuri 250 W bh 241,500.00

68 Lampu Son 150 W bh 246,200.00

69 Lampu Taman + Tiang + Lampu 1 Buah bh 745,200.00

70 Lampu Baret 30 cm + Neon bh 100,000.00

71 Lampu Neon Arcrilik 2 x 40 W lengkap bh 21,800.00

72 Pentanahan Penangkal Petir ttk 420,800.00

73 Pentanahan Panel ttk 181,800.00

74 Pipa Penangkal Petir bh 32,500.00

75 Box Sekering set 125,000.00

76 Box Lampu Mercury bh 46,600.00

77 Terminal Kabel bh 27,900.00

78 Tangkai Box lampu 3 m bh 427,700.00

79 Stainless steel m 16,900.00

80 Capasitor bh 107,700.00

81 Link Buckle bh 6,900.00

82 Stoping Buckle bh 2,700.00

83 Wed Clem bh 18,500.00

84 Tiang Besi 7m bh 2,678,500.00

85 Ignitor SN bh 161,500.00

86 Tap Connector bh 13,500.00

87 Foto Cell 6 Ampere bh 153,800.00

88 Lampu XL 18 watt ex. Phillips + Fitting set Rp 60,000.00

89 Lampu Down Light dengan Pijar 10 watt + Fitting set Rp 25,000.00

90 Lampu TL Bulat 40 watt ex. Phillips set Rp 100,000.00

P BAHAN ALAT PENGANTUNG DAN KUNCI

1 Kunci Silinder ALFA untuk Pintu Alumunium bh 204,750.00

2 Tarikan Pintu bh 23,000.00

3 Kunci 2 Slaag ROYAL bh 61,350.00

4 Rel Henderson Lengkap bh 618,300.00

5 Rel Maraton I Pintu unt 64,800.00

6 Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226 bh 192,000.00

7 Kunci 2 Slaag Ancor Asli bh 88,600.00

8 Kunci 2 Slaag ISO bh 102,300.00

9 Kunci KM Bulat Kualitas Biasa bh 40,950.00

10 Kunci KM Bulat Sekwalitas ALFA bh 26,900.00

11 Kunci 2 Slaag Silinder Utama Standard bh 170,500.00

12 Kunci Gembok bh 10,300.00

13 Kunci tanam Slaag Royal bh 87,350.00

14 Kunci tanam Slaag Ancor bh 68,250.00

15 Kunci 2 Slaag Kuda Terbang bh 65,600.00

16 Kunci Jendela bh 6,500.00

17 Espangolet ps 51,200.00

18 Grendel Hitam Biasa 15 cm bh 6,750.00

19 Grendel 15 cm bh 10,900.00

20 Grendel 5 cm biasa bh 2,700.00

21 Hak Angin Kait Jendela Biasa ps 6,750.00

Page 186: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 186+1

1 2 3 4

22 Hak Angin Jendela Antik ps 16,350.00

23 Hak Angin Sendok Stainless / Kuningan bh 17,500.00

24 Nako Lengkap Tralis 1 Daun dn 13,650.00

25 Sloot Pintu berikut Rantai bh 23,800.00

26 Sloot Jendela Tunggal bh 8,850.00

27 Engsel Pintu Biasa bh 12,200.00

28 Engsel Pintu Unilon Standard ps 18,300.00

29 Engsel Jendela Biasa bh 7,400.00

30 Engsel Jendela Unilon ps 8,850.00

31 Engsel Patrun ps 5,450.00

32 Engsel Harmonika m1 11,500.00

33 Engsel Floring unit 450,000.00

34 Door Closer Kelas Standard ( Kelas Sedang ) unt 129,600.00

35 Door Closer Kelas Standard ( Kelas Baik ) unt 477,750.00

36 Door Closer Kelas Rendah unt 109,200.00

37 Tarikan Almari Rata - rata bh 9,500.00

38 Seng BJLS 30 lebar 60cm (1 rol 50 m' ) m1 23,900.00

39 Seng BJLS 30 lebar 90cm (1 rol 50 m' ) m1 30,700.00

40 Reiling Tangga Stainlessteel m' 160,000.00

Q BAHAN PENGIKAT UNTUK KONTRUKSI JALAN

1 Hotmix Jadi berikut alat dan bahan bakar ( T = 5 cm => 9 m2 ) ton 546,000.00

2 Aspal ( ESO ) 1 Drum 150 Kg kg 5,100.00

3 Aspal Curah kg 3,650.00

4 Aspal RC 70 ( Cilacap ) kg 4,875.00

5 Aspal Bitumen * M061 kg 4,875.00

6 As Buton *M062 kg 1,500.00

7 Minyak Fluk *M063 Lt 6,375.00

8 Minyak Aspal *M064 Lt 1,550.00

9 Minyak Tanah *M065 Lt 3,000.00

R BAHAN PENGHISAP AIR SUMUR DALAM

1 Pompa Kodok unit 171,000.00

2 Pompa Dragon Tegal unit 155,700.00

3 Pompa Dragon Asli unit 341,250.00

4 Mesin Pompa Air 100 W - Sanyo unit 1,149,300.00

5 Mesin Pompa Air 150 W - Sanyo unit 1,684,400.00

6 Pompa Zet pump 250 W - Sanyo unit 5,812,300.00

7 Pompa Zet pump 450 W - Sanyo unit 6,882,500.00

8 Pompa Submersible kap. 150 liter/menit 3 kW unit 25,252,500.00

9 Gear Pump kap. 60 liter/menit unit 12,332,500.00

10 Deep Well dengan kelengkapannya kap. 150 liter/menit unit 211,575,000.00

11 Hand Oil Pump unit 4,299,750.00

Page 187: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 187+1

1 2 3 4

S BAHAN PENAMPUNG AIR

1 Tangki Air Fiber Glass 0.5 m3 ( Excel ) bh 450,000.00

2 Tangki Air Fiber Glass 1 m3 ( Excel ) bh 700,000.00

3 Tangki Air Fiber Glass 2 m3 ( Excel ) bh 1,500,000.00

4 Bak Taraso WC 40 x 40 bh 27,500.00

5 Bak KM Taraso 60 x 60 bh 67,500.00

T BIAYA QUALITY CONTROL , IZIN - IZIN, PENGUKURAN

DAN BIAYA PENYAMBUNGAN

1 Penyambungan Listrik PLN 1w dihitung

2 IMB Bertingkat Rata - rata (Rumah ) m² dihitung

3 IMB Bertingkat Rata - rata (Kantor) m² dihitung

4 IMB tidak bertingkat Rata - rata (Rumah / Kantor) m² dihitung

5 IMB Bertingkat Rata - rata (untuk Usaha) m² dihitung

6 IMB tidak bertingkat Rata - rata (untuk Usaha) m² dihitung

7 Sondir Rata - rata 1 ttk dihitung

8 Pengukuran Site + Patok m² dihitung

9 Biaya Tes Jalan ( quality control ) ttk dihitung

10 Biaya Tes 1 Macam Beton 1 spl dihitung

11 Biaya Pengujian Bahan Agregat 1 spl dihitung

12 Biaya Pengujian Listrik + gambar + trafo & Adm 1 watt dihitung

13 Izin Sumur Artesis Lengkap unit dihitung

14 Penyambungan PDAM untuk rumah unit dihitung

15 Geolistrik 1 ttk dihitung

16 Geolistrik 1 ttk dihitung

U ALAT TUKANG.

1 Palu 0,5 kg bh 25,000.00

2 Cangkul bh 27,500.00

3 Singkup bh 33,500.00

4 Sekrop bh 42,000.00

5 Pengki bh 2,100.00

6 Linggis bh 25,000.00

7 Rool Meter 30 meter ( Bahan Plastik ) bh 55,000.00

8 Rool Meter 5 meter ( Bahan Besi ) bh 12,250.00

9 Selang Plastik untuk Water Pas dia. 0.5 cm bh 1,200.00

10 Water Pas Alumuniumm 60 cm bh 62,000.00

V STANDARD RATA - RATA SEWA ALAT BESAR , ALAT MEKANIK

TRUK, KENDARAAN RODA 4 & LAINNYA

1 Sewa Mesin Gilas 8 Ton s/d 10 ton hari 184,275.00

2 Tirud Roller 3 Jam / hari hari 202,600.00

3 Tamdam Roller 6 - 8 Ton 5 Jam / hr hari 300,000.00

4 Tamdam Roller 8 - 10 Ton 5 Jam / hr hari 282,000.00

Page 188: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 188+1

1 2 3 45 Roller Viberator - Ped 1 Ton 4 Jam /hr hari 258,000.00

6 Roller Viberator - Self 7 Ton 5 Jam /hr hari 307,000.00

7 Roller 3 Wheeled - 8 Ton 5 Jam /hr hari 178,000.00

8 Roller Pneumatic 8 - 15 Ton 5 Jam /hr hari 307,000.00

9 Loader Wheeled 5 Jam /hr hari 430,000.00

10 Sewa Kran 30 Ton hari 2,211,000.00

11 Sewa Exavator Backhoe 5 Jam /hari hari 645,000.00

12 Sewa Draklint jam 153,000.00

13 Whell Loader jam 184,000.00

14 Buldozer 4 Jam /hr hari 706,000.00

15 Ecavator Hydr 1 m3 hari 675,000.00

16 Backu hari 104,000.00

17 Motor Grader 5 Jam /hr jam 644,000.00

18 Pheumatic Drill Hammer 3 Jam / hr hari 215,000.00

19 Vibro Roller hari 184,000.00

20 Stone Crusher hari 215,000.00

21 AMP hari 276,000.00

22 Teractor Equament 2 Jam /hr hari 92,000.00

23 Screning Plent 5 Jam /hr hari 368,000.00

24 Asphal Finisher hari 276,000.00

25 Asphal Melting Kalte hari 153,500.00

26 Asphal Spayer hari 123,000.00

27 Asphal MIxing Plant hari 276,000.00

28 Sprayer,Self - Prop. 10001 4 Jam/hr hari 307,000.00

29 Stamper, Viberator Plate 3 Jam /hari hari 245,000.00

30 Crusher / SCR hari 921,000.00

31 Concrete Mixer 0.125 m3 hari 73,000.00

32 Concrete Mixer 0.5 m3 hari 105,000.00

33 Concrete Viberator hari 73,000.00

34 Pick Up hari 215,000.00

35 Dump Truck 3.5 Ton hari 307,000.00

36 Dump Truck 5 Ton 4 Jam /hr hari 368,500.00

37 Flatbed Truck 3.5 Ton hari 294,800.00

38 Truck 3/4 ( Colt Disel ) hari 307,000.00

39 Truck Fuso hari 737,000.00

40 Mesin Las Listrik 18 pk 8 jam hari 122,800.00

41 Mesin Pompa Air 3 " hari 92,000.00

42 Stamper 8 Jam hari 98,300.00

43 Compresor Air hari 92,000.00

44 Pump Water ( 5 cm ) 30 m3 / hari hari 61,400.00

45 Trailler, Towed 1 Ton 3 Jam/hr hari 61,400.00

46 Water Tank Truck 2 Jam/hr hari 184,300.00

W BAHAN BAKAR DAN PELUMAS1 Minyak Tanah lt 5,000.00

2 Kapur Bakar *M081 m³ 156,400.00

3 Kayu Bakar *M070 m³ 69,200.00

4 Bahan Bakar Residu lt 1,000.00

Page 189: RAB Reza.xlsx

Satuan Bahan

Daftar Analisa TARKIM Halaman : 189+1

1 2 3 45 Minyak Solar lt 8,500.00

6 Bensin Premium lt 9,000.00

7 Plus Oil lt 1,600.00

8 Minyak Pelumas lt 36,600.00

9 Elpiji / botol 15 kg 126,000.00

10 Asitilin / botol 15.1 kg 107,000.00

11 Angin ( 02 ) / botol btl 68,200.00

12 Kawat Las Listrik kg 21,000.00

13 Karbit kg 10,400.00

14 Aspal ltr 7,500.00

15 Aspal Kemas Pand Grade 60/70 Drum 897,600.00

772 Pintu Air Sorong 50 x 50 cm

773 Pintu Air Double Stang 1 x 2 Meter

774 Pintu Air Double Stang 1,5 x 2 Meter

775 Pintu Air Double Stang 1 x 2,5 Meter

776 Pintu Air Double Stang 1,5 x 2,5 Meter

777 Pintu Air Stang Tunggal 1x 1,5 Meter

778 Pintu Air Stang Tunggal 0,5 x 1 Meter

X BAHAN FASILITAS LALU LINTAS1 Rambu Jalan Uk. 45 x 45 cm bh 305,000.00

2 Rambu Jalan Uk. 60 x 60 cm bh 465,800.00

3 Rambu Jalan Uk. 70 x 70 cm bh 617,650.00

4 RPPJ Uk. 105 x 140 cm bh 1,781,250.00

5 RPPJ Uk. 120 x 160 cm bh 2,139,500.00

6 Pagar Pengaman Jalan bh 605,600.00

7 Marka Jalan (Road Marking) Uk. 0,2 x 12 cm m 27,300.00

8 Paku Marka uk. 2 x 10 x 10 cm bh 233,750.00

9 Paku Marka uk. 2 x 10 x 12 cm bh 242,200.00

10 Apill (Trafic Light)-Simpang Tiga unit 101,124,000.00

11 Apill (Trafic Light)-Simpang Empat unit 120,601,000.00

12 Lampu Peringatan (Warning Light) unit 54,315,000.00

13 Patok Tikungan (dilineator) bahan plastik bh 399,200.00

14 Patok Tikungan (dilineator) pipa besi bh 300,300.00

15 Cermin Tikungan unit 4,692,000.00

16 Kerucut Lalu Lintas Uk. 90 cm bh 315,650.00

17 Kerucut Lalu Lintas Uk. 75 cm bh 332,600.00

18 Kerucut Lalu Lintas Uk. 60 cm bh 315,600.00

19 Timbangan Portable unit 637,105,200.00

20 Peralatan PKB otomatik unit 7,556,145,800.00 21 Peralatan PKB semi otomatik unit 4,800,597,000.00 22 Peralatan Uji Pemeriksaan dan Pengawasan Kb di Jalan unit 4,275,343,800.00

Page 190: RAB Reza.xlsx

Harga Satuan Pekerjaan Halaman : 190+3

Trotoarisasi danPenataan Alun-alun Langensari

HARGA SATUAN PEKERJAAN

NO. URAIAN JUMLAH

1 2 3

A.01.06 1 M1 PENGUKURAN DAN PASANGAN BOUWPLANK #REF!

A.01.07 1 M2 PEMBUATAN DIREKSI KEET DAN LOS BAHAN #REF!

A.01.10 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN #REF!

A.01.12 1 M3 BONGKARAN BETON BERTULANG #REF!

A.01.13 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH #REF!

A.01.16 1 M2 PAPAN NAMA PROYEK #REF!

A.02.01 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 1 M #REF!

A.02.02 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 2 M #REF!

A.02.03 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 3 M #REF!

A.02.04 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 4 M #REF!

A.02.05 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 5 M #REF!

A.02.06 1 M3 GALIAN TANAH KERAS SEDALAM 1 METER #REF!

A.02.07 1 M3 GALIAN TANAH CADAS SEDALAM 1 METER #REF!

A.02.08 1 M3 GALIAN TANAH LUMPUR SEDALAM 1 METER #REF!

A.02.09 1 M2 PEKERJAAN STRIPING TANAH SETINGGI 1 METER #REF!

A.02.10 1 M3 PEMBUANGAN TANAH SEJAUH 150 METER #REF!

A.02.11 1 M3 URUGAN TANAH KEMBALI #REF!

A.02.12 1 M3 PEMADATAN TANAH #REF!

A.02.13 1 M3 URUGAN PASIR #REF!

A.02.14 1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 3 PS : 7 TL #REF!

A.02.15 1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 5 TL #REF!

A.02.16 1 M3 LAPISAN PUDEL CAMPURAN 1 KP : 5 TS #REF!

A.02.17 1 M3 PEMASANGAN LAPISAN IJUK #REF!

A.02.18 1 M3 URUGAN SIRTU #REF!

A.02.19 1 M2 PEMBUATAN JALAN SEMENTARA, TEBAL 25 CM #REF!

A.02.20 1 M3 PEKERJAAN GALIAN TANAH SUMURAN MAX KEDALAMAN 10 M' #REF!

A.02.22 1 M3 PENIMBUNAN TANAH DIPADATKAN (TANAH DARI LUAR) #REF!

A.02.23 1 M2 PASANGAN LEMPENGAN RUMPUT SAMPAI TUMBUH #REF!

A.03.02 1 M3 PASANG PONDASI BATU KALI 1 Pc : 2 Ps #REF!

A.03.03 1 M3 PASANG PONDASI BATU KALI 1 Pc : 3 Ps #REF!

A.03.04 1 M3 PASANG PONDASI BATU KALI 1 Pc : 4 Ps #REF!

A.03.05 1 M3 PASANG PONDASI BATU KALI 1 Pc : 5 Ps #REF!

A.03.13 1 M3 PASANG PONDASI BATU KOSONG #REF!

A.03.14 1 M3 PASANG PONDASI SUMURAN DIAMETER 100 CM #REF!

A.03.15 1 M3 PASANG PONDASI SIKLOP 40% BATU KALI #REF!

A.03.16 1 M1 PEMBUATAN TIANG PANCANG (40 X 40) CM, BETON BERTULANG #REF!

A.03.17 1 M1 PEMBUATAN TIANG PANCANG (35 X 35) CM, BETON BERTULANG #REF!

A.03.18 1 M3 PASANGAN BATU BRONJONG #REF!

A.03.20 1 M3 PASANGAN BATU TEMPEL+ SIARAN #REF!

A.03.21 1 M3 PASANGAN BATU HITAM #REF!

A.04.05 1 M2 PASANGAN BATA MERAH TEBAL 1 BATA, 1 Pc : 5 Ps #REF!

A.04.09 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 2 Ps #REF!

Page 191: RAB Reza.xlsx

Harga Satuan Pekerjaan Halaman : 191+3

Trotoarisasi danPenataan Alun-alun Langensari

1 2 3

A.04.10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 3 Ps #REF!

A.04.11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps #REF!

A.04.12 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps #REF!

A.04.18 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB.20) #REF!

A.04.19 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB.15) #REF!

A.04.20 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB.10) #REF!

A.04.25 1 M2 PASANGAN DINDING DINDING ROSTER/TERAWANG (12X11X24) #REF!

A.04.27 1 M2 PASANGAN DINDING ANYAMAN BAMBU, RANGKA KAYU #REF!

A.05.02 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 15 MM + ACIAN #REF!

A.05.03 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 15 MM #REF!

A.05.04 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 15 MM #REF!

A.05.05 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 15 MM #REF!

A.05.13 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 20 MM + ACIAN #REF!

A.05.14 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 20 MM #REF!

A.05.15 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 20 MM #REF!

A.05.16 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 20 MM #REF!

A.05.19 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 25 MM + ACIAN #REF!

A.05.20 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 25 MM #REF!

A.05.21 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 25 MM #REF!

A.05.22 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 25 MM #REF!

A.05.23 1 M2 PASANGAN PLESTERAN 1 Pc : 2 Ps, TEBAL 30 MM + ACIAN #REF!

A.05.24 1 M2 PASANGAN PLESTERAN 1 Pc : 3 Ps, TEBAL 30 MM #REF!

A.05.25 1 M2 PASANGAN PLESTERAN 1 Pc : 4 Ps, TEBAL 30 MM #REF!

A.05.26 1 M2 PASANGAN PLESTERAN 1 Pc : 5 Ps, TEBAL 30 MM #REF!

A.05.31 1 M2 PASANGAN PLESTERAN SKONING 1 Pc : 2 Ps, TEBAL 15 MM #REF!

A.05.34 1 M2 PASANGAN PLESTERAN CIPRAT, 1 Pc : 2 Ps #REF!

A.05.35 1 M2 PASANGAN PLESTERAN SIAR ADUKAN 1 Pc : 2 Ps #REF!

A.05.36 1 M2 ACIAN PC #REF!

A.06.01 1 M2 PASANGAN KUSEN PINTU DAN JENDELA KAYU JATI #REF!

A.06.02 1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU KAMPER BANJAR #REF!

A.06.03 1 M3 PASANGAN KUSEN PINTU DAN JENDELA KAYU KAYU LOKAL KLS II #REF!

A.06.04 1 M2 PASANGAN PINTU KLAMP KAYU KAYU LOKAL KLS II #REF!

A.06.05 1 M2 PASANGAN PINTU PANEL KAYU JATI #REF!

A.06.06 1 M2 PASANGAN PINTU PANEL KAYU KAMPER BANJAR #REF!

A.06.07 1 M2 PASANGAN PINTU PANEL KAYU LOKAL KLS II #REF!

A.06.08 1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU JATI #REF!

A.06.09 1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU KAMPER BANJAR #REF!

A.06.10 1 M2 PASANGAN PINTU DAN JENDELA KACA KAYU KAYU LOKAL KLS II #REF!

A.06.11 1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU JATI #REF!

A.06.12 1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU KAMPER BANJAR #REF!

A.06.13 1 M2 PASANGAN PINTU DAN JENDELA JALUSI KAYU LOKAL KLS II #REF!

A.06.14 1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU JATI #REF!

A.06.15 1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU KAMPER BANJAR #REF!

A.06.16 1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU LOKAL KLS II #REF!

A.06.17 1 M2 PASANGAN JALUSI MATI KUSEN KAYU JATI #REF!

A.06.18 1 M2 PASANGAN JALUSI MATI KUSEN KAYU KAMPER #REF!

Page 192: RAB Reza.xlsx

Harga Satuan Pekerjaan Halaman : 192+3

Trotoarisasi danPenataan Alun-alun Langensari

1 2 3

A.06.19 1 M2 PASANGAN JALUSI MATI KUSEN KAYU LOKAL KLS II #REF!

A.06.20 1 M2 PASANGAN PINTU PLYWOOD RANGKAP, RANGKA KAYU LOKAL KLS II #REF!

A.06.21 1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU JATI #REF!

A.06.22 1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU KAMPER BANJAR #REF!

A.06.23 1 M2 PASANG PINTU TEAKWOOD RANGKAP, RANGKA KAYU LOKAL KLS II #REF!

A.06.24 1 M2 PASANG PINTU POLYWOOD & FORMIKA RANGKAP, RANGKA KAYU JATI #REF!

A.06.25 1 M2 PASANG PINTU POLYWOOD & FORMIKA RANGKA KAYU KAMPER BANJAR #REF!

A.06.26 1 M2 PASANG PINTU POLYWOOD & FORMIKA RANGKA KAYU LOKAL KLS II #REF!

A.06.27 1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU JATI #REF!

A.06.28 1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU KAMPER BANJAR (DIVERNIS) #REF!

A.06.29 1 M2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU LOKAL KLS II (DIVERNIS) #REF!

A.06.30 1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU JATI #REF!

A.06.31 1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU KAMPER BANJAR #REF!

A.06.32 1 M2 PASANG PINTU FORMIKA DOUBLE, RANGKA KAYU LOKAL KLS II #REF!

A.06.33 1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU JATI #REF!

A.06.34 1 M2 PASANG KONSTRUKSI KUDA - KUDA KAYU KAMPER BANJAR #REF!

A.06.35 1 M2 PASANGAN KONSTRUKSI KUDA - KUDA KAYU KAYU LOKAL KLS II #REF!

A.06.36 1 M3 PASANG KONSTRUKSI KUDA - KUDA KAYU KRUING #REF!

A.06.37 1 M3 PASANG KASO + RENG GENTENG PALENTONG KAYU KAMPER #REF!

A.06.38 1 M3 PASANG KASO + RENG GENTENG PALENTONG KAYU KAYU LOKAL KLS II #REF!

A.06.39 1 M3 PASANG KASO + RENG GENTENG BETON KAYU KAYU LOKAL KLS II #REF!

A.06.40 1 M3 PASANG KASO + RENG ATAP SIRAP KAYU KAMPER BANJAR #REF!

A.06.41 1 M3 PASANG KASO + RENG ATAP SIRAP KAYU KAYU LOKAL KLS II #REF!

A.06.42 1 M3 PASANG RANGKA LANGIT - LANGIT (1,00 x 1,00) m, KAYU JATI #REF!

A.06.43 1 M3 PASANG RANGKA LANGIT - LANGIT (1,00 x 1,00) m, KAYU KAMPER #REF!

A.06.44 1 M3 PASANG RANGKA LANGIT - LANGIT (1,00 x 1,00) m, KAYU KAYU LOKAL KLS II #REF!

A.06.45 1 M2 PASANG LISPLANG UKURAN (3 x 20) cm, KAYU JATI #REF!

A.06.46 1 M2 PASANG LISPLANG UKURAN (3 x 20) cm, KAYU KAMPER BANJAR #REF!

A.06.47 1 M2 PASANG LISPLANG UKURAN (3 x 20) cm, KAYU LOKAL KLS II #REF!

A.06.48 1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU JATI #REF!

A.06.49 1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU KAMPER BANJAR #REF!

A.06.50 1 M2 PASANG LISPLANG UKURAN (3 x 30) cm, KAYU LOKAL KLS II #REF!

A.06.51 1 M2 PASANG LISPLANG UKURAN 2 x (3 x 20) cm, KAYU KAMPER BANJAR #REF!

A.06.52 1 M2 PASANG LISPLANG UKURAN 2 x (2 x 20) cm, KAYU KAMPER BANJAR #REF!

A.06.53 1 M2 PASANG LISPLANG UKURAN 2 x (2 x 20) cm, KAYU LOKAL KLS II #REF!

A.06.54 1 M2 PASANG RANGKA DINDING PEMISAH KAYU KAMPER BANJAR #REF!

A.06.55 1 M2 PASANG RANGKA DINDING PEMISAH KAYU KAYU LOKAL KLS II #REF!

A.06.56 1 M2 PASANG DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KAMPER BANJAR #REF!

A.06.57 1 M2 PASANG DINDING PEMISAH POLYWOOD RANGKAP, RANGKA KAYU KAMPER BANJAR #REF!

A.06.58 1 M2 PASANG POLYWOOD TEBAL 4 mm, UNTUK DINDING #REF!

A.06.59 1 M1 PASANG LIST PLAFOND PROFIL KAYU KAMPER BANJAR 4/4 CM #REF!

A.06.60 1 M1 PASANG LIST PLAFOND PROFIL KAYU LOKAL KLS II 4/4 #REF!

A.06.61 1 M2 PASANGAN PINTU PANEL KAYU LOKAL KLS II LAPIS ALUMUNIUM #REF!

A.07.01 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr #REF!

A.07.05 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr #REF!

A.07.13 1 M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr #REF!

Page 193: RAB Reza.xlsx

Harga Satuan Pekerjaan Halaman : 193+3

Trotoarisasi danPenataan Alun-alun Langensari

1 2 3

A.07.25 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR #REF!

A.07.28 1 m2 PASANG BEKISTING UNTUK PONDASI #REF!

A.07.29 1 m2 PASANG BEKISTING UNTUK SLOOF #REF!

A.07.30 1 m2 PASANG BEKISTING UNTUK KOLOM #REF!

A.07.31 1 m2 PASANG BEKISTING UNTUK BALOK #REF!

A.07.32 1 m2 PASANG BEKISTING UNTUK LANTAI #REF!

A.07.33 1 m2 PASANG BEKISTING UNTUK DINDING #REF!

A.07.34 1 m2 PASANG BEKISTING UNTUK TANGGA #REF!

A.07.35 1 M3 MEMBUAT BETON DENGAN MUTU K 225 #REF!

A.07.36 1 M3 MEMBUAT BETON DENGAN MUTU K 275 #REF!

A.07.37 1 M2 PASANG TANGGA PENGECORAN #REF!

A.07.38 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 kg BESI + BEKISTNG) #REF!

A.07.47 1 M3 MEMBUAT SLOOF 10/15 (202 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM

A.07.48 1 M3 MEMBUAT SLOOF 12/15 (257,778 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM

A.07.49 1 M3 MEMBUAT SLOOF 12/15 (170.78 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM

A.07.50 1 M3 MEMBUAT SLOOF 15/20 (180,8889 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM

A.07.51 1 M2 PAS. LANGIT-LANGIT BILIK #REF!

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM

A.07.52 1 M3 MEMBUAT KOLOM 12/12 (314.0964 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM

A.07.53 1 M3 MEMBUAT KOLOM 12/12 (208.864 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM

A.07.54 1 M3 MEMBUAT KOLOM 15/15 (211,5556 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM

A.07.55 1 M3 MEMBUAT KOLOM 15/15 (139.550 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM

A.07.56 1 M3 MEMBUAT KOLOM 15/20 (180,8889 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM

A.07.57 1 M3 MEMBUAT KOLOM 15/20 (116.889 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM

A.07.59 1 M3 MEMBUAT KOLOM 20/20 (142,333 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM

A.07.60 1 M3 MEMBUAT KOLOM 20/20 (91.334 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM

A.07.61 1 M3 MEMBUAT KOLOM 25/25 (99.6267 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM

A.07.62 1 M3 MEMBUAT KOLOM 30/30 (74,67 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM

A.07.63 1 M3 MEMBUAT KOLOM 40/25 (211.7300 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 8 BATANG DIA 16 BEUGEL DIA 8 JARAK 15 CM

A.07.64 1 M3 MEMBUAT RING BALK 10/15 (202 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM

Page 194: RAB Reza.xlsx

Harga Satuan Pekerjaan Halaman : 194+3

Trotoarisasi danPenataan Alun-alun Langensari

1 2 3

A.07.65 1 M3 MEMBUAT RING BALK 10/15 (202 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM

A.07.66 1 M3 MEMBUAT BALOK 12/15 (217.7900 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM

A.07.67 1 M3 MEMBUAT RING BALK 15/15 (211,5556 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 20 CM

A.07.68 1 M3 MEMBUAT RING BALK 15/15 (139.550 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 20 CM

A.07.69 1 M3 MEMBUAT RING BALK 15/20 (180,8889 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM

A.07.70 1 M3 MEMBUAT RING BALK 15/20 (116,889 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM

A.07.71 1 M3 MEMBUAT RING BALK 15/25 (151,8222 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM

A.07.72 1 M3 MEMBUAT RING BALK 15/25 ( 97.423 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 4 BATANG DIA 10 BEUGEL DIA 6 JARAK 15 CM

A.07.73 1 M3 MEMBUAT RING BALK 15/25 (175,5556 Kg Besi + Bekesting) #REF!

DENGAN TULANGAN 5 BATANG DIA 12 BEUGEL DIA 8 JARAK 15 CM

A.07.75 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.10 JARAK 10 cm TEBAL 10 cm #REF!

A.07.76 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 10 cm #REF!

A.07.77 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 1 LAPIS DIA.12 JARAK 10 cm TEBAL 12 cm #REF!

A.07.78 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.12 JARAK 10 cm TEBAL 12 cm #REF!

A.07.79 1 M3 PEK. PLAT BETON BERTULANG, TULANGAN 2 LAPIS DIA.16-17.5CM DAN DIA. 10-12.5 cm TEBAL 20 cm #REF!

A.08.02 1 M2 PASANG ATAP GENTENG PALENTONG #REF!

A.08.03 1 M2 PASANG ATAP GENTENG MORANDO NATURAL (18 BH) #REF!

A.08.05 1 M2 PASANG BUBUNG GENTENG PALENTONG #REF!

A.08.06 1 M2 PASANG BUBUNG GENTENG MORANDO NATURAL #REF!

A.08.11 1 M2 PASANG ATAP ASBES GELOMBANG (1,80 x 0,90m) x 5 mm #REF!

A.08.12 1 M2 PASANG ATAP ASBES GELOMBANG (0,80 x 1,80m) x 5 mm 18,350.00

A.08.13 1 M2 PASANG ATAP ASBES GELOMBANG (0,90m x 1,80m) x 4 mm #REF!

A.08.14 1 M' PASANG NOK ASBES GELOMBANG , 4 mm #REF!

A.08.30 1 M2 PASANG ATAP GENTENG BETON #REF!

A.09.02 1 M2 LANGIT - LANGIT ETERNIT (1,00 x 1,00) m , TEBAL 4 mm #REF!

A.09.24 1 M2 LANGIT - LANGIT GYPSUM BOARD, TEBAL 9 mm #REF!

A.10.01 MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK #REF!

A.10.02 MEMASANG 1 BUAH KLOSET JONGKOK PORSELEN #REF!

A.10.04 MEMASANG 1 BUAH URINOIR #REF!

A.10.05 MEMASANG 1 BUAH WASTAFEL #REF!

A.10.06 MEMASANG 1 BUAH BAK MANDI TRASO VOLUME 0,3 M3 #REF!

A.10.07 MEMASANG 1 BUAH BAK MANDI FIBREGLASS VOLUME 0,3 M3 #REF!

A.10.08 MEMASANG 1 BUAH BAK MANDI BATU BATA VOLUME 0,3 M3 #REF!

A.10.09 MEMASANG 1 BUAH BADKIP PORSELEN #REF!

A.10.16 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (30X30) TINGGI 35 CM #REF!

A.10.17 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (45X45) TINGGI 50 CM #REF!

A.10.18 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA UKURAN (60X60) TINGGI 65 CM #REF!

Page 195: RAB Reza.xlsx

Harga Satuan Pekerjaan Halaman : 195+3

Trotoarisasi danPenataan Alun-alun Langensari

1 2 3

A.10.19 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,5" 4,250.00

A.10.20 MEMASANG 1 M' PIPA GALVANIS DIAMETER 0,75" #REF!

A.10.21 MEMASANG 1 M' PIPA GALVANIS DIAMETER 1" #REF!

A.10.22 MEMASANG 1 M' PIPA GALVANIS DIAMETER 1,5" #REF!

A.10.23 MEMASANG 1 M' PIPA GALVANIS DIAMETER 3" #REF!

A.10.24 MEMASANG 1 M' PIPA GALVANIS DIAMETER 4" #REF!

A.10.25 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,5" #REF!

A.10.26 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 0,75" #REF!

A.10.27 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1" #REF!

A.10.28 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1,5" #REF!

A.10.29 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2" #REF!

A.10.30 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 2,5" #REF!

A.10.31 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3" #REF!

A.10.32 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4" #REF!

A.10.33 MEMASANG 1 BH BAK CUCI PIRING STAILES STEEL #REF!

A.10.35 MEMASANG 1 BH KRAN DIAMETER 0,75' ATAU 0,5" #REF!

A.10.36 MEMASANG 1 BH FLOOR DRAIN #REF!

A.10.37 1 UNIT SEPTICTANK 2,5 X 1,5 X 2M + REMBESANNYA ( KANTOR TYPE BESAR ) #REF!

A.10.38 1 UNIT SEPTICTANK 2 X 1,5 X 1,5 M + REMBESANNYA ( KANTOR TYPE KECIL ) #REF!

A.10.39 1 UNIT SEPTICTANK 1.5 X 1 X 1,5 M + REMBESANNYA ( RUMAH KAPASITAS KECIL) #REF!

A.10.40 1 M1 SALURAN GREFEL BETON 1/2 Q 20 CM + PASANGAN #REF!

A.10.41 1 M1 SALURAN GREFEL BETON 1/2 Q 30 CM + PASANGAN #REF!

A.11.01 1 KG PASANG RANGKA ATAP BAJA #REF!

A.11.08 1 M2 PASANG ROLLING DOOR #REF!

A.11.09 1 M2 PASANG PINTU ALUMINIUM 467,430.00

A.11.12 1 M2 PASANG TERALIS BESI #REF!

A.11.17 1 M2 PASANG JENDELA NAKO DAN TRALIS #REF!

A.11.18 1 M2 PASANG TALANG DATAR, SENG BJLS 28 #REF!

A.11.19 1 M2 PASANG TALANG MIRING, SENG BJLS 28 #REF!

A.11.20 1 M2 PASANG TALANG 1/2 LINGKARAN D-10 CM, SENG BJLS 28 #REF!

A.11.21 1 M2 PASANG TALANG 1/2 LINGKARAN D-10 CM, SENG BJLS 24 #REF!

A.12.02 1 BUAH PASANG KUNCI TANAM BIASA #REF!

A.12.03 1 BUAH PASANG KUNCI TANAM KAMAR MANDI #REF!

A.12.04 1 BUAH PASANG KUNCI SILINDER #REF!

A.12.05 1 BUAH PASANG ENGSEL PINTU #REF!

A.12.06 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU #REF!

A.12.09 1 BUAH PASANG KAIT ANGIN 22,440.00

A.12.10 1 BUAH PASANG DOOR CLOSER #REF!

A.12.11 1 BUAH PASANG KUNCI SELOT #REF!

A.12.12 1 BUAH PASANG PEGANGAN PINTU / DOOR HOLDER #REF!

A.12.14 1 BUAH PASANG REL PINTU DORONG #REF!

A.12.16 1 M2 PASANG KACA, TEBAL 3 MM #REF!

A.12.17 1 M2 PASANG KACA, TEBAL 5 MM #REF!

A.12.18 1 M2 PASANG KACA, TEBAL 8 MM #REF!

A.12.19 1 M2 PASANG KACA BURAM, TEBAL 12 MM #REF!

A.12.24 1 M2 PASANG KACA PATRI, TEBAL 5 MM #REF!

Page 196: RAB Reza.xlsx

Harga Satuan Pekerjaan Halaman : 196+3

Trotoarisasi danPenataan Alun-alun Langensari

1 2 3

A.12.25 1 KG PEK. ERECTION KONST KUDA-KUDA BESI #REF!

A.12.26 1 KG PEKERJAAN BAJA IWF EX DN #REF!

A.12.27 1 KG PEKERJAAN BAJA EX JAPAN #REF!

A.12.28 1 KG PEK. KONSTRUKSI BESI SIKU / PROFIL EX. DN #REF!

A.12.29 1 Titik PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL = KAWAT 4 MM #REF!

A.12.30 1 TITIK MELOBANG KONSTRUKSI BESI DENGAN BOR #REF!

A.12.31 1 M2 PEKERJAAN BONDEX #REF!

A.12.32 1 M2 PEKERJAAN WIREMESH M8 #REF!

A.12.33 1 M1 PEK.PAGAR DEPAN TRALIS STANDARD #REF!

A.12.34 1 M1 PEK. PAGAR BELAKANG / SAMPING #REF!

A.13.02 1 M2 PASANG LANTAI TEGEL BADAK ABU-ABU UKURAN 30X30 CM #REF!

A.13.09 1 M2 PASANG LANTAI UBIN GRANITO UKURAN 40X40 CM #REF!

A.13.42 1 M2 PASANG LANTAI KERAMIK 10 X 20 CM #REF!

A.13.44 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM #REF!

A.13.45 1 M2 PASANG LANTAI KERAMIK 25 X 25 CM #REF!

A.13.46 1 M2 PASANG LANTAI KERAMIK 15 X 20 CM #REF!

A.13.47 1 M2 PASANG LANTAI KERAMIK 33 X 33 CM #REF!

A.13.48 1 M2 PASANG LANTAI KERAMIK 33 X 33 CM ANTISLIP #REF!

A.13.49 1 M2 PASANG LANTAI KERAMIK 10 X 33 CM #REF!

A.13.51 1 M2 PASANG LANTAI MARMER #REF!

A.13.56 1 M2 PASANG LANTAI PARQUET JATI #REF!

A.13.58 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, PUTIH #REF!

A.13.59 1 M2 PASANG DINDING PORSELEN 11 X 11 CM, WARNA #REF!

A.13.62 1 M2 PASANG DINDING PORSELEN 10 X 20 CM, WARNA #REF!

A.13.63 1 M2 PASANG DINDING PORSELEN 20 X 20 CM, WARNA #REF!

A.13.66 1 M2 PASANG DINDING KERAMIK 10 X 20 CM, #REF!

A.13.68 1 M2 PASANG DINDING KERAMIK 20 X 20 CM, #REF!

A.13.69 1 M2 PASANG DINDING KERAMIK 10 X 20 CM, #REF!

A.13.70 1 M2 PASANG DINDING MARMER #REF!

A.13.74 1 M2 PASANG DINDING BATU TEMPEL #REF!

A.13.75 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM DN PUTIH POLOS #REF!

A.13.76 1 M2 PASANG LANTAI KERAMIK 30 X 30 CM WARNA / CORAK / ANTI SLIP #REF!

A.13.77 1 M2 PASANG LANTAI KERAMIK 40 X 40 CM #REF!

A.13.78 1 M2 PASANG DINDING KERAMIK 20 X 25 CM, #REF!

A.13.82 1 M2 PASANG PLINT KAYU 2 X 10 CM #REF!

A.13.83 1 M2 PASANGAN PAVING BLOCK WARNA (6 CM) #REF!

A.13.84 1 M2 PASANGAN PAVING BLOCK WARNA (8 CM) #REF!

A.13.85 1 M2 PASANGAN BATU CANDI #REF!

A.13.86 1 M2 PASANGAN PAVING BLOCK NATURAL (6 CM) #REF!

A.13.87 1 M2 PASANGAN PAVING BLOCK NATURAL (8 CM) #REF!

A.14.07 1 M2 PENGECATAN BIDANG KAYU LAMA #REF!

A.14.08 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR), 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP #REF!

A.14.12 1 M2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER #REF!

A.14.14 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) #REF!

A.14.15 1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) #REF!

A.14.19 1 M2 PEMASANGAN WALL PAPER #REF!

Page 197: RAB Reza.xlsx

Harga Satuan Pekerjaan Halaman : 197+3

Trotoarisasi danPenataan Alun-alun Langensari

1 2 3

A.14.21 1 M2 PLITURAN BIDANG KAYU (BIASA) #REF!

A.14.24 1 M2 PENGECATAN PLAFOND DAN DINDING (INTERIOR ICI) #REF!

A.14.25 1 M2 PENGECATAN DINDING SEKELAS VINILEX (3x) #REF!

A.14.26 1 M2 PENGECATAN PLAFOND SEKELAS VINILEX (3x) #REF!

A.14.28 1 M2 PENGECATAN DINDING SEKELAS SANLEX (3x) #REF!

A.14.29 1 M2 PENGECATAN PLAFOND SEKELAS SANLEX (3x) #REF!

A.14.30 1 M2 PENGECATAN BIDANG KAYU (3X) BERIKUT MENI #REF!

A.14.31 1 M2 PENGECATAN BESI (3X) #REF!

A.14.32 1 M2 PENGECATAN BIDANG KAYU LAMA BERCAT #REF!

A.14.33 1 M2 PENGECATAN DINDING (LAMA) #REF!

Page 198: RAB Reza.xlsx

Panjang Keseluruhanx 2.7 1.15y 5.3 1.55

8 2.7

Galian Tanah :Luas

1.4 0.9 0.80.92

Volume19.688

Urugan Tanah4.922

Urugan Pasir0.9 0.9

17.334Batu Kosong

0.7 0.22.996

Batu Kali0.3 0.7 0.7

7.49Sloef

0.15 0.250.8025

Kolom0.15 0.15 30.54

Ringbalk0.8025

Urugan Pasir Bawah Lantai5.3 2.7 0.2

2.862Rabat Beton Bawah Lantai

5.3 2.7 0.071.0017

Pas Tegel 30x30L1 2.7 3.35L2 1.35 1.55LK

Pas Tegel 20x201.35 1.55

2.0925

Rangka Plafond Jumlah Panjang Lebar

Bi 1 3 3.1 0.08Bi 2 3 2.7 0.08Ba 1 6 3.1 0.05Ba 2 5 2.7 0.05

Page 199: RAB Reza.xlsx

JumlahLuas Plafond

Panjang Lebar2.7 3.1

Hasil 8.37Lis Plafond

Kusen 1Keliling Lebar Tinggi

9.1 0.05 0.15Hasil 0.06825

Kusen IIKeliling Lebar Tinggi

4.9 0.05 0.15Hasil 0.03675

Dinding Transramu/ t= 50cm Panjang Tinggi Tebal

7.8 0.5 0.12Hasil 0.468

u/ t=150cm Panjang Tinggi Tebal5.1 1.5 0.12

Hasil 0.918t=150cm t=50cm

0.918 0.468Jumlah 1.386

Dinding Biasau/ 1:5 Panjang Tinggi Tebal

8.7 2.5 0.12Hasil 2.61

Kusen 1 Lebar Tinggi Tebal2.3 1.6 0.12

Hasil 0.4416u/ 1:3 Panjang Tinggi Tebal

5.8 1.5 0.12Hasil 1.044

Kusen 2 Lebar Tinggi Tebal0.7 1.6 0.12

Hasil 0.1344Ventilasi Panjang Lebar Tebal

0.7 0.4 0.12Hasil 0.0336

Volume u/1:5 u/1:3 Kusen 12.61 1.044 0.4416Hasil 3.0444

Page 200: RAB Reza.xlsx

Plesteran TransramLuas Tebal Jumlah plesteran11.55 0.12 2Hasil 2.772

Plesteran Dinding BiasaLuas Tebal Jumlah plesteran25.65 0.12 2Hasil 6.156

Pas Tegel Dinding WC 20 x 20Keliling Tinggi

5.1 1.5Hasil 7.65

Pas Tegel Plint DindingKeliling Tebal

5.1 0.1Hasil 0.51

Acian Dinding + KolomPlesteran Transram Plesteran Biasa

2.772 6.156Hasil 8.928

Balok tarik 1Lebar Tinggi Panjang0.08 0.12 1.909Hasil 0.0733056

Balok tarik IILebar Tinggi Panjang0.08 0.12 3.1Hasil 0.02976

Jumlah volume balok tarik8.95776

Tiang RajaLebar Tinggi Panjang0.08 0.12 3.09Hasil 0.059328

Balok GapitMengapit Lebar Tinggi

2 0.06 0.12Hasil 0.088992

Balok SokongJumlah Lebar Tinggi

4 0.06 0.12Hasil 0.0523008

Kaki Kuda-KudaLebar Tinggi Panjang0.08 0.12 3.632

Page 201: RAB Reza.xlsx

Hasil 0.1394688Gording

G Lebar Tinggi1 0.06 0.122 0.06 0.123 0.06 0.124 0.06 0.125 0.06 0.126 0.06 0.12

Jumlah Hasil 0.198Kasau

K Lebar Tinggi1 0.05 0.072 0.05 0.073 0.05 0.074 0.05 0.075 0.05 0.076 0.05 0.077 0.05 0.07

Jumlah Hasil 0.10465Reng

R Lebar Tinggi1 0.02 0.032 0.02 0.033 0.02 0.034 0.02 0.035 0.02 0.036 0.02 0.037 0.02 0.038 0.02 0.039 0.02 0.0310 0.02 0.0311 0.02 0.0312 0.02 0.0313 0.02 0.0314 0.02 0.03

Jumlah Hasil 0.03504Balok Bubungan

0.05 0.1 0.40.002

Papan Bubungan0.02 0.01 0.4

0.00008Bubungan

14.928Lisplank 1

Page 202: RAB Reza.xlsx

2 0.02 0.30.0744

Lisplank 22 0.02 0.3

0.0648Volume Lisplank Keseluruhan

0.1392

Page 203: RAB Reza.xlsx

2.7 2.75.38 2.7 21.4

8

9.0452.0925

11.1375

Tinggi Hasil0.16 0.119040.16 0.103680.1 0.0930.1 0.0675

Page 204: RAB Reza.xlsx

Jumlah 0.38322

Kusen 2 Ventilasi0.1344 0.0336

3.0444

Page 205: RAB Reza.xlsx

Jumlah plesteran

Jumlah plesteran

Panjang balok tarik IJumlah 1.909

40.0733056

Panjang balok tarik IIJumlah 3.1

10.02976

Panjang Tiang RajaJumlah 3.09

20.059328

Panjang Jumlah1.545 4

0.088992Panjang Balok Sokong

Panjang 1.8161.816

0.0523008Panjang Kaki Kuda-Kuda

Jumlah 3.6324

Page 206: RAB Reza.xlsx

0.1394688

Panjang Jumlah Hasil0.9 2 0.0132.5 2 0.0364.1 2 0.0590.45 2 0.00652.1 2 0.03023.7 2 0.0533

0.198

Panjang Jumlah Hasil0.6 4 0.00841.1 4 0.01541.6 4 0.02240.55 4 0.00771.05 4 0.01471.55 4 0.02172.05 2 0.0144

0.10465

Panjang Jumlah Hasil0.5 2 0.00061.1 2 0.00131.65 2 0.0022.3 2 0.00282.9 2 0.00353.5 2 0.00424.1 2 0.00490.1 2 0.00010.65 2 0.00081.25 2 0.00151.85 2 0.00222.5 2 0.0033.1 2 0.00373.7 2 0.0044

0.03504

Page 207: RAB Reza.xlsx

3.1 2

2.7 2

Page 208: RAB Reza.xlsx

Besi Tulangan Untuk Beton Bertulang :Besi beton ada yang berbentuk bulat polos dan ada pula yang berbentuk PROFIL

Daftar besi (baja) polos beton

No.Diameter Luas Tampang Berat

(mm) (kg/m')1 4.5 0.16 0.1252 5 0.20 0.1533 5.5 0.24 0.188

9800 4454.545 4 6 0.28 0.2205 6.5 0.33 0.259

13000 6 6.8 0.36 0.2827 7 0.38 0.300

22000 5597.964 8 8 0.50 0.3939 8.5 0.56 0.439

10 9 0.63 0.49928000 4516.129 11 10 0.79 0.62039000 4396.843 12 12 1.13 0.887

13 13 1.33 1.04058000 4797.353 14 14 1.54 1.209

15 15 1.77 1.37780000 5063.291 16 16 2.01 1.580

17 18 2.54 1.994135000 6053.812 18 19 2.83 2.230

19 20 3.14 2.465195000 6543.624 20 22 3.80 2.980

0 0 21 25 4.91 3.85022 26 5.31 4.13623 28 6.16 4.83024 30 7.07 5.510

0 0 25 32 8.04 6.31026 34 9.08 7.13027 35 9.62 7.60028 36 10.18 7.99029 38 11.34 8.90030 40 12.57 9.87031 42 13.85 10.90032 44 15.21 11.90033 46 16.62 13.00034 48 18.10 14.20035 48.5 18.47 14.500

5177.945 36 50 19.64 15.40037 55 23.76 18.70038 60 28.28 22.20039 65 33.18 26.00040 70 38.48 30.20041 75 44.18 34.70042 80 50.27 39.30043 85 56.75 44.50044 90 63.62 49.90045 95 70.88 55.60046 100 78.54 61.70047 110 95.03 74.600

(cm2)

Page 209: RAB Reza.xlsx

48 120 113.10 88.80049 130 132.70 104.00050 140 153.90 121.000

No.Penampang

Pjg. BesiBlk/Klm h b Tul. Pokok

1 Sp 15/20 0.20 0.15 33.33tulangan utama diameter 12 kp 15/15157.6889 kg/m3 2 Kp.15/15 0.15 0.15 44.44

begel297.30

lengkungan begel0.56

Page 210: RAB Reza.xlsx

Daftar besi (baja) yang diprofilkan Daftar besi (baja) yang diprofilkanKode Berat Dia. Nom. L.Tpang Nom. Primtr nom. Jarak JumlahNo. kg/m' (d) mm (cm2) cm as-as batangD10 0.560 9.530 0.713 3.000 (cm) tiap m'D13 0.995 12.700 1.267 4.000 7.0 14.290D16 1.560 15.900 1.986 5.000 7.5 13.330D19 2.250 19.100 2.865 6.000 8.0 12.500D22 3.040 22.200 3.871 7.000 8.5 11.760D25 3.980 25.400 5.067 8.000 9.0 11.110D29 5.040 28.600 6.424 9.000 9.5 10.530D32 6.230 31.800 7.942 10.000 10.0 10.000D35 7.510 34.900 9.566 11.000 10.5 9.530D38 8.950 38.100 11.400 12.000 11.0 9.100

11.5 8.70012.0 8.34012.5 8.00013.0 7.70013.5 7.41014.0 7.15014.5 6.90015.0 6.67015.5 6.46016.0 6.25016.5 6.06017.0 5.89017.5 5.72018.0 5.56019.0 5.27020.0 5.000

Page 211: RAB Reza.xlsx

Jumlah Besi Tul.Pokok Berat Besi Tul.PokokTul.Pok. I Tul.Pok. II Tul.Pok. III Tul.Pok. IV Tul.Pok. I Tul.Pok. II Tul.Pok.III Tul.Pok.IV

polos ulir polos ulir

4.00 0.00 0.00 0.00 52.40 0.00 0.00 0.00

4.00 0.00 0.00 0.00 157.69 0.00 0.00 0.00

Page 212: RAB Reza.xlsx

Daftar besi (baja) yang diprofilkanLuas penampang total dalam 100 cm lebar platsesuai diameter tulangan (mm) yang tercantum

6 8 10 12 14 16 19 224.040 7.180 11.220 16.160 21.990 28.730 40.510 54.3003.770 6.700 10.470 15.080 20.520 26.810 37.810 50.8103.530 6.280 9.820 14.140 19.240 25.130 35.450 47.5103.330 5.910 9.240 13.310 18.110 23.650 33.700 44.7203.140 5.590 8.730 12.570 17.100 22.340 31.520 42.2302.980 5.290 8.270 11.900 16.200 21.160 29.860 40.0102.830 5.030 7.850 11.310 15.390 20.110 28.360 38.0102.690 4.790 7.480 10.770 14.660 19.150 27.010 36.2002.570 4.570 7.140 10.280 13.990 18.280 25.780 34.5502.460 4.370 6.830 9.830 13.390 17.480 24.660 33.0502.360 4.190 6.540 9.420 12.830 16.760 23.630 31.6702.260 4.020 6.280 9.050 12.320 16.080 22.690 30.4102.170 3.870 6.040 8.700 11.840 15.470 21.820 29.2402.090 3.720 5.820 8.380 11.400 14.890 21.010 28.1602.020 3.590 5.610 8.080 11.000 14.360 20.260 27.1501.950 3.470 5.420 7.800 10.620 13.870 19.560 26.2101.890 3.350 5.240 7.540 10.260 13.410 18.910 25.3401.820 3.240 5.070 7.300 9.930 12.970 18.300 24.5201.770 3.140 4.910 7.070 9.620 12.570 17.730 23.7601.710 3.050 4.760 6.850 9.330 12.190 17.190 23.0401.660 2.960 4.620 6.650 9.050 11.820 16.680 22.3601.620 2.870 4.490 6.460 8.790 11.490 16.210 21.7201.570 2.790 4.360 6.280 8.550 11.170 15.750 21.1201.490 2.650 4.140 5.950 8.100 10.580 14.920 20.0101.410 2.510 3.930 5.650 7.690 10.050 14.180 19.010

Page 213: RAB Reza.xlsx

Besi Beugel Total Besi Jmlh. Besi Pjg 1 Bh Berat

Beugel Beugel Beugel Polos Ulir

223.22 0.68 94.11 146.51 0.00

297.30 0.58 67.77 225.45 0.00

Page 214: RAB Reza.xlsx

Perhitungan Berat Besi:Luas Penampang

Panjang Jumlah Berat TotalLebar Tinggi1.000 1.000 #REF! 0 #VALUE!

#REF! 0 #REF!#REF! 0 #REF!#REF! 0 #REF!#REF! 0 #REF!#REF! 0 #REF!#REF! 0 #REF!#REF! 0 #REF!#REF! 0 #REF!#REF! 0 #REF!

Total Berat Besi/Penampang = 0

Page 215: RAB Reza.xlsx

0.15 #REF!