rab puskesmas tembuku ii 15062012

110
DAFTAR HARGA SATUAN PERIODE DESEMBER 2011 - PEBRUARI 2012 A. BAHAN BANGUNAN NO. NAMA BARANG SATUAN HARGA DENPASAR BADUNG TABANAN JEMBRANA BULELENG KARANG ASEM KLUNGKUNG I BAHAN PASANGAN 1 Batu Kali - Batu Bulat M3 Terendah 190,000 162,500 145,000 145,000 160,000 110,000 110,000 Tertinggi 225,000 170,000 158,000 155,000 228,800 158,000 115,000 - Batu Pecah Besar M3 Terendah 162,500 162,500 165,000 165,000 180,000 145,000 150,000 Tertinggi 248,000 170,000 174,000 190,000 250,000 150,000 155,000 - Batu Pecah 5 - 7 Cm M3 Terendah 135,000 135,000 145,000 150,000 170,000 110,000 100,000 Tertinggi 170,000 170,000 195,000 165,000 201,200 123,000 115,000 - Batu Pecah 3 - 5 Cm M3 Terendah 135,000 135,000 180,000 155,000 192,000 105,000 115,000 Tertinggi 211,950 150,000 205,000 170,000 200,100 139,000 120,000 - Batu Pecah 2 - 3 Cm M3 Terendah 170,000 170,000 180,000 160,000 165,000 110,000 105,000 Tertinggi 180,000 180,000 205,000 170,000 200,000 153,000 115,000 - Batu Split 1 - 2 Cm M3 Terendah 170,000 170,000 172,500 150,000 150,000 140,000 115,000 Tertinggi 180,000 180,000 184,000 165,000 197,800 170,000 125,000 2 Batu Karang M3 Terendah 133,333 133,333 130,000 135,000 135,000 130,000 120,000 Tertinggi 170,000 170,000 174,000 165,000 165,000 125,000 125,000 Lime Stone M3 Terendah 95,000 95,000 110,000 115,000 125,000 125,000 110,000 Tertinggi 110,000 110,000 184,000 120,000 150,000 150,000 120,000 3 Kerikil/Koral - Biasa/Timbunan M3 Terendah 150,000 130,000 110,000 75,000 130,000 67,000 72,000 Tertinggi 155,000 150,000 205,000 90,000 160,000 78,000 75,000 - Beton M3 Terendah 150,000 150,000 158,000 120,000 175,000 90,000 95,000 Tertinggi 180,000 180,000 180,000 125,000 187,400 99,000 100,000 4 Tanah Urug M3 Terendah 85,000 60,000 50,000 75,000 65,000 65,000 65,000 Tertinggi 100,000 65,000 65,000 80,000 70,000 72,000 70,000 5 Pasir - Tibunan/Urug M3 Terendah 116,667 116,667 110,000 110,000 120,000 63,000 50,000 Tertinggi 126,000 120,000 126,000 115,000 151,800 70,000 65,000 - Beton M3 Terendah 130,000 120,000 130,000 130,000 150,000 90,000 87,500 Tertinggi 150,000 130,000 150,000 170,000 174,000 100,000 100,000 - Pasangan M3 Terendah 125,000 130,000 125,000 130,000 150,000 100,000 92,500 Tertinggi 155,000 150,000 158,000 175,000 167,900 102,000 100,000 6 Batu Bata - Bata Gosok Klas I Bj Terendah 2,500 2,500 2,500 2,200 3,000 2,100 2,000 Tertinggi 2,600 2,600 2,600 2,700 4,100 2,600 2,100 - Bata Gosok Klas II Bj Terendah 2,000 1,900 1,900 2,000 2,800 1,250 1,800 Tertinggi 2,500 2,000 2,000 2,100 3,600 1,350 1,900

Upload: frederic-chiasman

Post on 02-Jan-2016

184 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: Rab Puskesmas Tembuku II 15062012

DAFTAR HARGA SATUANPERIODE DESEMBER 2011 - PEBRUARI 2012

A. BAHAN BANGUNAN

NO. NAMA BARANG SATUAN HARGA BADUNG TABANAN BULELENG BANGLI GIANYAR

I BAHAN PASANGAN

1 Batu Kali

- Batu Bulat M3 Terendah 190,000 162,500 145,000 145,000 160,000 110,000 110,000 125,000 125,000

Tertinggi 225,000 170,000 158,000 155,000 228,800 158,000 115,000 163,000 141,225

- Batu Pecah Besar M3 Terendah 162,500 162,500 165,000 165,000 180,000 145,000 150,000 155,000 155,000

Tertinggi 248,000 170,000 174,000 190,000 250,000 150,000 155,000 188,428 167,000

- Batu Pecah 5 - 7 Cm M3 Terendah 135,000 135,000 145,000 150,000 170,000 110,000 100,000 130,000 115,000

Tertinggi 170,000 170,000 195,000 165,000 201,200 123,000 115,000 178,000 167,055

- Batu Pecah 3 - 5 Cm M3 Terendah 135,000 135,000 180,000 155,000 192,000 105,000 115,000 135,000 125,000

Tertinggi 211,950 150,000 205,000 170,000 200,100 139,000 120,000 189,750 167,055

- Batu Pecah 2 - 3 Cm M3 Terendah 170,000 170,000 180,000 160,000 165,000 110,000 105,000 145,000 125,000

Tertinggi 180,000 180,000 205,000 170,000 200,000 153,000 115,000 201,250 167,055

- Batu Split 1 - 2 Cm M3 Terendah 170,000 170,000 172,500 150,000 150,000 140,000 115,000 120,000 135,000

Tertinggi 180,000 180,000 184,000 165,000 197,800 170,000 125,000 135,000 172,725

2 Batu Karang M3 Terendah 133,333 133,333 130,000 135,000 135,000 130,000 120,000 140,000 120,000

Tertinggi 170,000 170,000 174,000 165,000 165,000 125,000 125,000 168,000 130,000

Lime Stone M3 Terendah 95,000 95,000 110,000 115,000 125,000 125,000 110,000 135,000 120,000

Tertinggi 110,000 110,000 184,000 120,000 150,000 150,000 120,000 168,000 150,000

3 Kerikil/Koral

- Biasa/Timbunan M3 Terendah 150,000 130,000 110,000 75,000 130,000 67,000 72,000 80,000 76,000

Tertinggi 155,000 150,000 205,000 90,000 160,000 78,000 75,000 86,250 80,000

- Beton M3 Terendah 150,000 150,000 158,000 120,000 175,000 90,000 95,000 105,000 100,000

Tertinggi 180,000 180,000 180,000 125,000 187,400 99,000 100,000 143,750 160,000

4 Tanah Urug M3 Terendah 85,000 60,000 50,000 75,000 65,000 65,000 65,000 55,000 57,015

Tertinggi 100,000 65,000 65,000 80,000 70,000 72,000 70,000 60,000 60,000

5 Pasir

- Tibunan/Urug M3 Terendah 116,667 116,667 110,000 110,000 120,000 63,000 50,000 75,000 65,000

Tertinggi 126,000 120,000 126,000 115,000 151,800 70,000 65,000 113,850 96,180

- Beton M3 Terendah 130,000 120,000 130,000 130,000 150,000 90,000 87,500 95,000 100,000

Tertinggi 150,000 130,000 150,000 170,000 174,000 100,000 100,000 117,300 129,880

- Pasangan M3 Terendah 125,000 130,000 125,000 130,000 150,000 100,000 92,500 105,000 110,000

Tertinggi 155,000 150,000 158,000 175,000 167,900 102,000 100,000 143,750 150,000

6 Batu Bata

- Bata Gosok Klas I Bj Terendah 2,500 2,500 2,500 2,200 3,000 2,100 2,000 2,600 2,000

Tertinggi 2,600 2,600 2,600 2,700 4,100 2,600 2,100 2,990 2,100

- Bata Gosok Klas II Bj Terendah 2,000 1,900 1,900 2,000 2,800 1,250 1,800 2,300 1,800

Tertinggi 2,500 2,000 2,000 2,100 3,600 1,350 1,900 2,645 1,995

DENPASAR

JEMBRANA

KARANG ASEM

KLUNGKUNG

Page 2: Rab Puskesmas Tembuku II 15062012

NO. NAMA BARANG SATUAN HARGA BADUNG TABANAN BULELENG BANGLI GIANYARDENPASA

RJEMBRAN

AKARANG

ASEMKLUNGKU

NG

- Pasangan Bj Terendah 1,000 1,000 1,000 950 1,100 1,200 800 1,000 900

Tertinggi 1,100 1,100 1,250 1,100 1,300 1,300 900 1,150 1,365

Page 3: Rab Puskesmas Tembuku II 15062012

NO. NAMA BARANG SATUAN HARGA BADUNG TABANAN BULELENG BANGLI GIANYARDENPASA

RJEMBRAN

AKARANG

ASEMKLUNGKU

NG

7 Paras/Padas

- Batu Lahar Karangasem Bj Terendah 16,000 16,000 5,500 6,000 5,500 4,500 4,750 4,750 13,000

Tertinggi 18,000 18,000 6,000 6,500 6,000 5,000 5,250 5,050 15,000

- Batu Palimanan Bj Terendah 16,000 16,000 14,000 7,500 8,500 8,000 8,000 17,000 13,000

Tertinggi 18,000 18,000 15,000 14,000 16,000 16,000 16,000 20,000 15,000

- Batu Candi/Jawa Bj Terendah 16,000 16,000 7,500 7,000 7,500 8,000 7,500 7,500 13,000

Tertinggi 18,000 18,000 9,000 8,000 8,500 9,500 9,000 9,000 15,000

8 Port. Cement (50 Kg)

- Gresik Zak Terendah 55,000 55,000 54,000 54,000 53,500 55,000 54,000 54,000 53,000

Tertinggi 58,000 58,500 58,500 60,400 60,600 62,000 62,000 63,250 62,000

- Tiga Roda Zak Terendah 53,000 53,000 53,000 53,000 53,000 54,000 53,000 53,000 52,000

Tertinggi 57,500 57,500 57,500 58,000 60,000 59,000 59,000 60,375 60,000

- Semen Warna Kg Terendah 13,000 13,000 12,000 10,000 10,000 15,000 8,000 10,000 10,000

Tertinggi 15,000 15,000 13,000 11,000 12,000 17,000 10,000 11,500 11,000

II BAHAN ATAP

1 Genteng Biasa Bj Terendah 1,500 1,500 1,100 1,050 1,400 1,300 1,200 920 1,250

Tertinggi 3,000 3,000 1,200 1,100 1,800 1,500 2,000 1,900 1,600

2 Bubungan Biasa Bj Terendah 3,500 3,500 2,750 3,250 3,500 2,500 2,500 2,700 3,200

Tertinggi 4,500 4,500 4,500 4,000 4,400 3,300 2,700 3,000 3,500

3 Plentong Besar Bj Terendah 1,500 1,500 1,300 1,300 1,500 1,700 1,300 1,500 1,350

Tertinggi 3,000 3,000 1,400 2,000 2,000 18,000 1,500 2,061 2,000

4 Bubungan Plentong Besar Bj Terendah 5,500 5,750 5,600 5,700 7,000 6,000 5,500 6,000 5,700

Tertinggi 7,000 7,000 5,700 7,000 7,800 7,400 5,800 7,763 7,200

5 Sirap Ikat Terendah 85,000 85,000 90,000 82,500 95,000 95,000 85,000 92,000 85,000

Tertinggi 165,000 165,000 95,000 85,000 105,000 105,000 95,000 95,000 90,000

6 Ijuk Kg Terendah 35,000 35,000 32,500 35,000 35,000 25,000 25,000 30,000 35,000

Tertinggi 36,500 37,000 35,000 37,500 37,500 27,500 27,500 35,000 37,500

7 Alang-Alang Lbr Terendah 16,000 17,000 18,000 15,000 16,000 16,000 15,000 16,000 17,000

Tertinggi 17,000 18,000 21,000 16,000 19,000 20,000 16,000 22,000 20,895

- Tali Pengikat Gulung Terendah 16,000 16,000 16,000 14,000 14,000 14,000 13,000 14,000 12,500

Tertinggi 17,000 17,000 18,000 15,000 15,000 15,000 14,000 15,000 15,000

8 Abses Cement

- Gel. 1,8 M' x 0,80 M'/4 mm Lbr Terendah 27,000 27,000 27,000 26,000 28,000 28,000 27,000 28,000 27,000

Tertinggi 28,000 28,000 28,000 27,000 30,000 32,000 28,000 31,600 28,000

- Bubungan Bj Terendah 25,000 25,000 24,000 21,000 25,000 22,000 22,000 24,500 22,000

Tertinggi 26,000 26,000 25,000 25,000 30,000 26,000 24,000 34,000 24,000

- Rata. 1' x 1' M'/6 mm Lbr Terendah 14,000 14,000 13,000 13,250 17,000 16,000 14,000 14,000 20,000

Tertinggi 15,000 15,000 15,000 15,000 18,000 18,000 15,000 15,000 24,675

9 Seng

- Gel. (BJLS 28) Lbr Terendah 42,500 42,000 42,500 37,500 42,000 43,000 40,000 47,000 42,000

Tertinggi 48,500 48,000 48,000 42,000 49,000 49,000 42,000 49,000 44,310

Page 4: Rab Puskesmas Tembuku II 15062012

NO. NAMA BARANG SATUAN HARGA BADUNG TABANAN BULELENG BANGLI GIANYARDENPASA

RJEMBRAN

AKARANG

ASEMKLUNGKU

NG

- Datar. (BJLS 28) Lbr Terendah 42,500 43,000 42,500 37,500 45,000 40,000 41,000 47,000 42,500

Tertinggi 47,500 47,000 47,500 40,000 50,000 42,000 43,000 54,000 44,310

Page 5: Rab Puskesmas Tembuku II 15062012

NO. NAMA BARANG SATUAN HARGA BADUNG TABANAN BULELENG BANGLI GIANYARDENPASA

RJEMBRAN

AKARANG

ASEMKLUNGKU

NG

III BAHAN KAYU

1 - Kayu Kamper Papan 3/20 M3 Terendah 7,700,000 7,500,000 8,000,000 8,000,000 8,727,200 8,200,000 8,200,000 8,000,000 8,268,750

Tertinggi 8,100,000 8,100,000 9,000,000 9,000,000 9,000,000 8,500,000 8,500,000 9,200,000 8,820,000

- Kayu Kamper Balok 8/12 M3 Terendah 6,700,000 6,800,000 7,500,000 7,400,000 8,181,800 7,500,000 7,200,000 7,500,000 7,500,000

Tertinggi 7,700,000 7,300,000 8,000,000 8,000,000 8,500,000 8,000,000 7,800,000 8,600,000 8,268,750

- Kayu Kamper Balok 6/12 M3 Terendah 6,700,000 6,800,000 7,000,000 7,400,000 8,181,800 7,500,000 7,300,000 7,500,000 7,300,000

Tertinggi 7,700,000 7,300,000 7,500,000 8,000,000 8,500,000 8,000,000 7,500,000 8,500,000 8,000,000

- Kayu Kamper Usuk 5/7 M3 Terendah 6,000,000 6,200,000 6,400,000 7,000,000 7,500,000 7,200,000 7,500,000 7,200,000 8,268,750

Tertinggi 6,500,000 6,500,000 6,900,000 7,500,000 8,000,000 8,000,000 8,000,000 8,050,000 8,820,000

- Kayu Kamper Usuk 4/6 M3 Terendah 6,000,000 6,200,000 6,400,000 7,000,000 7,500,000 7,000,000 7,000,000 7,200,000 8,268,750

Tertinggi 6,500,000 6,500,000 6,900,000 7,500,000 8,000,000 7,200,000 7,300,000 8,050,000 8,820,000

- Kayu Kamper Reng Ikat Terendah 3,000,000 3,000,000 350,000 350,000 375,000 300,000 350,000 330,000 330,000

Tertinggi 4,900,000 4,900,000 380,000 425,000 400,000 350,000 375,000 350,000 400,000

2 - Kayu Kruing Papan M3 Terendah 5,000,000 5,000,000 6,000,000 5,500,000 6,500,000 6,100,000 5,500,000 6,325,000 6,719,685

Tertinggi 5,500,000 5,500,000 6,600,000 7,000,000 7,000,000 6,500,000 6,000,000 6,500,000 7,778,499

- Kayu Kruing Balok 8/12 M3 Terendah 4,500,000 4,500,000 4,800,000 5,000,000 6,000,000 5,000,000 6,250,000 5,175,000 5,400,000

Tertinggi 4,900,000 4,900,000 6,300,000 6,000,000 6,500,000 5,500,000 6,500,000 5,750,000 6,719,685

- Kayu Kruing Balok 6/12 M3 Terendah 4,320,000 4,500,000 4,400,000 5,000,000 6,000,000 5,000,000 6,250,000 5,175,000 5,400,000

Tertinggi 4,800,000 4,900,000 4,800,000 6,000,000 6,500,000 5,500,000 6,500,000 5,500,000 6,719,685

- Kayu Kruing Usuk 5/7 M3 Terendah 4,000,000 4,500,000 4,500,000 5,500,000 6,000,000 4,800,000 4,800,000 5,000,000 4,800,000

Tertinggi 4,800,000 4,800,000 4,600,000 6,000,000 6,500,000 5,000,000 5,000,000 7,000,000 7,778,000

- Kayu Kruing Usuk 4/6 M3 Terendah 4,000,000 4,500,000 4,500,000 5,500,000 5,500,000 4,800,000 4,800,000 5,000,000 4,800,000

Tertinggi 4,800,000 4,800,000 4,600,000 6,000,000 6,000,000 5,000,000 5,000,000 7,000,000 7,778,000

- Kayu Kruing Reng Ikat Terendah 2,500,000 2,400,000 280,000 300,000 320,000 350,000 220,000 230,000 280,000

Tertinggi 3,900,000 3,900,000 300,000 335,000 340,000 390,000 280,000 241,000 350,000

3 - Kayu Bekisting Papan M3 Terendah 1,850,000 1,800,000 2,300,000 1,500,000 2,000,000 1,750,000 1,500,000 2,500,000 2,000,000

Tertinggi 2,000,000 2,000,000 2,500,000 2,000,000 2,500,000 2,000,000 2,800,000 2,750,000 2,200,000

- Kayu Bekisting Balok 8/12 M3 Terendah 1,750,000 1,700,000 1,800,000 1,500,000 3,000,000 1,500,000 1,500,000 2,750,000 1,800,000

Tertinggi 1,850,000 1,800,000 2,100,000 2,000,000 3,500,000 2,000,000 2,800,000 3,500,000 2,000,000

- Kayu Bekisting Balok 6/12 M3 Terendah 1,750,000 1,700,000 1,800,000 1,500,000 2,000,000 2,500,000 1,500,000 2,750,000 1,800,000

Tertinggi 1,850,000 1,800,000 2,100,000 2,000,000 3,500,000 2,750,000 2,000,000 3,500,000 2,000,000

- Kayu Bekisting Usuk 5/7 M3 Terendah 1,700,000 1,650,000 1,700,000 1,500,000 1,500,000 2,000,000 1,500,000 2,750,000 1,750,000

Tertinggi 1,800,000 1,750,000 2,000,000 2,000,000 2,000,000 3,500,000 2,000,000 3,500,000 1,900,000

- Kayu Bekisting Usuk 4/6 M3 Terendah 1,700,000 1,650,000 1,700,000 1,250,000 2,000,000 2,000,000 1,500,000 2,750,000 1,750,000

Tertinggi 1,800,000 1,750,000 2,000,000 1,500,000 3,500,000 2,500,000 2,000,000 3,500,000 1,900,000

- Kayu Bekisting Reng Ikat Terendah 150,000 150,000 175,000 120,000 175,000 185,000 175,000 165,000 170,000

Tertinggi 175,000 175,000 200,000 150,000 200,000 200,000 200,000 180,000 195,000

4 Seseh Dolken M' Terendah 120,000 120,000 45,000 40,000 40,000 40,000 40,000 45,000 45,000

Tertinggi 135,000 135,000 50,000 45,000 50,000 45,000 45,000 50,000 50,000

5 Seseh Balok 6/12 M3 Terendah 2,500,000 2,750,000 2,800,000 2,500,000 2,800,000 3,000,000 3,000,000 2,800,000 3,000,000

Tertinggi 3,000,000 3,000,000 3,000,000 3,500,000 3,000,000 3,500,000 3,200,000 3,450,000 3,993,780

C100
Reng 2/3 cm x 400 cm x 25 btg
M101
untuk menjadikan harga dalam m3, harga per ikat dikalikan 16,67
Page 6: Rab Puskesmas Tembuku II 15062012

NO. NAMA BARANG SATUAN HARGA BADUNG TABANAN BULELENG BANGLI GIANYARDENPASA

RJEMBRAN

AKARANG

ASEMKLUNGKU

NG

6 Dolken Kayu 8-10/4m Btg Terendah 28,000 27,000 25,000 24,000 22,000 25,000 24,000 25,000 25,000

Tertinggi 50,000 50,000 27,000 27,000 25,000 27,000 25,000 32,500 28,000

Page 7: Rab Puskesmas Tembuku II 15062012

NO. NAMA BARANG SATUAN HARGA BADUNG TABANAN BULELENG BANGLI GIANYARDENPASA

RJEMBRAN

AKARANG

ASEMKLUNGKU

NG

7 List Kayu 2/4 M3 Terendah 45,000 45,000 40,000 45,000 45,000 42,000 41,000 41,000 40,000

Tertinggi 50,000 50,000 55,000 55,000 55,000 56,000 55,000 55,000 55,000

8 Kayu Profil Btg Terendah 70,000 70,000 65,000 60,000 65,000 62,000 65,000 70,000 65,000

Tertinggi 80,000 80,000 75,000 65,000 75,000 65,000 72,500 75,000 72,500

9 Lis Gypsum 5 cm Btg Terendah 12,500 12,000 11,000 12,000 12,000 12,000 11,000 12,000 11,000

Tertinggi 17,500 17,000 12,500 13,000 13,000 13,000 12,500 13,000 12,500

10 Lis Gypsum 10 cm Btg Terendah 19,000 19,000 19,000 19,000 20,000 20,000 19,000 20,000 22,500

Tertinggi 22,000 22,000 22,500 22,500 25,500 23,000 23,500 24,000 25,000

11 Multipleks

- 9 mm Lbr Terendah 100,000 100,000 105,000 110,000 109,000 110,000 100,000 110,000 105,000

Tertinggi 110,000 110,000 130,000 120,000 115,000 190,000 105,000 208,000 153,000

- 12 mm Lbr Terendah 135,000 135,000 132,000 132,000 132,500 135,000 132,000 135,000 130,000

Tertinggi 140,000 140,000 162,000 145,000 135,000 137,000 135,000 140,000 135,000

IV BAHAN BAMBU

1 - Bambu Besar Btg Terendah 12,000 13,000 11,000 12,000 15,000 11,000 12,000 18,000 10,000

Tertinggi 15,000 15,000 17,000 15,000 16,000 14,000 14,000 23,000 18,165

- Bambu Sedang Btg Terendah 10,000 11,000 10,000 7,000 10,000 10,000 10,000 8,000 9,000

Tertinggi 12,000 12,500 15,000 10,000 10,700 14,000 14,000 15,000 15,750

- Bambu Kecil Btg Terendah 7,000 8,000 6,000 6,000 8,500 8,000 7,000 7,000 8,500

Tertinggi 8,000 10,000 7,000 7,000 9,000 9,000 8,000 10,000 12,075

2 - Gedeg Kelas I M2 Terendah 30,000 30,000 25,000 22,000 22,000 24,000 20,000 22,000 22,000

Tertinggi 33,000 33,000 34,000 25,000 27,000 25,000 21,000 29,000 36,330

- Gedeg Kelas II M2 Terendah 25,000 26,000 22,000 17,000 18,000 20,000 17,000 20,000 20,000

Tertinggi 27,000 28,000 30,000 22,000 19,000 21,000 18,000 23,000 22,000

V BETON CETAK

1 Kerawang Bj Terendah 4,200 4,250 4,500 4,500 4,500 4,500 4,500 5,000 4,800

Tertinggi 4,500 4,500 47,500 4,750 5,500 4,800 4,750 6,500 6,900

2 Buis Beton

- "50/0.75 m' Bj Terendah 75,000 60,000 60,000 65,000 82,500 65,000 55,000 65,000 55,000

Tertinggi 80,000 65,000 65,000 80,000 85,000 70,000 60,000 80,000 82,320

- "30/0.75 m' Bj Terendah 50,000 50,000 55,000 55,000 50,000 50,000 40,000 50,000 50,000

Tertinggi 55,000 60,000 60,000 60,000 55,600 55,000 50,000 60,000 61,320

- "25/0.75 m' Bj Terendah 40,000 35,000 35,000 35,000 35,000 35,000 35,000 40,000 38,000

Tertinggi 45,000 40,000 40,000 40,000 38,900 40,000 40,000 45,000 55,000

- "20/0.75 m' Bj Terendah 30,000 30,000 30,000 33,000 34,500 30,000 30,000 35,000 38,000

Tertinggi 40,000 35,000 35,000 35,000 37,500 33,000 35,000 38,000 52,920

- "20/0.75 m' (U) Bj Terendah 25,000 25,000 25,000 25,000 25,000 22,000 22,000 24,000 22,000

Tertinggi 30,000 30,000 30,000 30,000 28,000 25,000 27,000 28,000 27,000

- "30/0.75 m' (U) Bj Terendah 30,000 30,000 30,000 30,000 23,000 27,000 25,000 25,000 30,000

Tertinggi 35,000 35,000 35,000 35,000 25,000 30,000 27,000 30,000 35,000

3 Batako Cetak Bj Terendah 1,850 1,600 1,600 1,600 1,800 1,800 1,400 1,500 1,600

Page 8: Rab Puskesmas Tembuku II 15062012

NO. NAMA BARANG SATUAN HARGA BADUNG TABANAN BULELENG BANGLI GIANYARDENPASA

RJEMBRAN

AKARANG

ASEMKLUNGKU

NG3 Batako Cetak Bj

Tertinggi 2,250 1,850 1,900 1,700 2,000 1,650 1,600 1,750 2,940

Page 9: Rab Puskesmas Tembuku II 15062012

NO. NAMA BARANG SATUAN HARGA BADUNG TABANAN BULELENG BANGLI GIANYARDENPASA

RJEMBRAN

AKARANG

ASEMKLUNGKU

NG

4 - Paving Blok 6/20/20 K-175 M2 Terendah 48,450 48,450 54,450 61,450 63,450 58,450 54,450 58,450 52,450

Tertinggi 51,000 51,000 57,000 64,000 66,000 61,000 57,000 61,000 55,000

- Paving Blok 6/20/20 K-225 M2 Terendah 55,000 55,000 57,300 64,300 66,300 61,300 57,300 61,300 55,300

Tertinggi 65,000 65,000 60,000 67,000 69,000 64,000 60,000 64,000 58,000

- Paving Blok 8/20/20 K-175 M2 Terendah 57,950 57,950 63,950 70,950 72,950 67,950 63,950 67,950 61,950

Tertinggi 61,000 61,000 67,000 74,000 76,000 71,000 67,000 71,000 65,000

- Paving Blok 8/20/20 K-225 M2 Terendah 60,800 60,800 66,800 73,800 75,800 70,800 66,800 70,800 64,800

Tertinggi 64,000 64,000 70,000 77,000 79,000 75,000 70,000 74,000 68,000

- Paving Blok 8/20/20 K-300 M2 Terendah 67,450 67,450 73,450 80,450 82,450 81,000 73,450 77,450 71,450

Tertinggi 71,000 71,000 77,000 84,000 86,000 85,000 77,000 81,000 75,000

- Paving Blok 8/20/20 K-400 M2 Terendah 86,450 86,450 92,450 99,450 101,450 96,450 92,450 96,450 90,450

Tertinggi 91,000 91,000 97,000 104,000 106,000 101,000 97,000 101,000 95,000

VI BAHAN LANTAI

1 Keramik Kw. I

- 20 x 20 Cm M2 Terendah 38,000 37,000 45,000 38,000 40,000 40,000 45,000 47,000 38,000

Tertinggi 40,000 40,000 50,000 45,000 44,700 45,000 48,000 51,000 42,000

- 20 x 25 Cm M2 Terendah 43,000 42,000 50,000 41,000 42,000 45,000 40,000 45,000 42,000

Tertinggi 45,000 45,000 54,000 50,000 50,000 47,000 43,000 48,300 43,000

- 30 x 30 Cm M2 Terendah 35,000 37,000 40,000 42,000 40,000 37,000 37,000 41,400 27,000

Tertinggi 37,000 40,000 45,000 45,000 41,700 46,000 41,000 59,000 36,000

- 40 x 40 Cm M2 Terendah 42,000 40,000 38,500 42,000 45,000 51,000 44,000 38,000 42,000

Tertinggi 45,000 42,000 48,000 45,000 48,700 55,000 50,000 40,000 43,000

- 20 x 20 Cm anti slip M2 Terendah 40,000 40,000 40,000 40,000 40,000 42,000 41,000 45,000 41,500

Tertinggi 42,000 42,000 45,000 45,000 42,000 45,000 43,000 51,750 43,000

- Plint 10 x 30 cm M2 Terendah 34,000 35,000 34,000 38,500 35,000 40,250 40,000 41,000 40,250

Tertinggi 35,000 37,000 35,000 42,000 38,000 42,000 41,500 42,500 42,000

- Plint 10 x 40 cm M2 Terendah 34,000 34,000 34,000 33,500 35,000 33,750 33,000 33,000 33,750

Tertinggi 35,000 35,000 35,000 36,000 38,000 35,000 34,500 34,500 34,000

- Lis 5 x 20 Cm M2 Terendah 24,000 24,000 20,000 18,000 18,750 18,750 17,000 18,000 20,500

Tertinggi 25,000 25,500 22,000 25,000 20,000 18,750 18,000 21,000 25,000

- Ubin PC Abu-abu 20 x 20 cm M2 Terendah 27,500 28,000 25,000 30,000 26,000 25,000 27,500 27,500 27,000

Tertinggi 30,000 30,000 30,000 35,000 28,000 26,000 30,000 32,000 30,000

- Plint PC Abu-abu 15 x 20 cm M2 Terendah 26,000 26,000 24,000 25,000 25,000 24,000 26,000 27,000 26,000

Tertinggi 27,000 27,000 26,000 27,000 26,000 25,000 28,000 28,000 28,000

VII BAHAN BESI

1 Besi Beton

- 4 mm Btg Terendah 11,000 11,000 11,500 11,500 13,000 14,000 12,500 13,000 13,000

Tertinggi 12,000 12,000 12,500 13,000 16,000 15,500 13,500 14,000 13,500

- 6 mm Btg Terendah 21,000 21,000 21,000 26,000 28,000 27,000 25,500 26,500 25,000

Tertinggi 23,000 23,000 22,000 32,000 36,000 33,000 30,000 32,000 30,000

- 8 mm Btg Terendah 32,000 32,000 30,000 36,000 40,764 40,000 34,000 35,000 34,000

Page 10: Rab Puskesmas Tembuku II 15062012

NO. NAMA BARANG SATUAN HARGA BADUNG TABANAN BULELENG BANGLI GIANYARDENPASA

RJEMBRAN

AKARANG

ASEMKLUNGKU

NG - 8 mm Btg

Tertinggi 37,000 37,000 35,000 40,000 42,000 44,000 38,000 41,000 40,000

Page 11: Rab Puskesmas Tembuku II 15062012

NO. NAMA BARANG SATUAN HARGA BADUNG TABANAN BULELENG BANGLI GIANYARDENPASA

RJEMBRAN

AKARANG

ASEMKLUNGKU

NG

- 10 mm Btg Terendah 49,000 52,500 45,000 50,000 57,000 58,000 54,000 66,000 55,000

Tertinggi 57,000 57,000 47,000 60,000 62,000 60,000 55,000 60,000 60,000

- 12 mm Btg Terendah 73,000 75,000 72,000 75,000 85,000 80,000 73,000 77,500 76,500

Tertinggi 82,000 82,000 74,000 90,000 97,000 90,000 75,000 97,000 90,000

- 16 mm (ulir) Btg Terendah 138,000 134,000 125,000 127,000 150,000 155,000 134,000 150,000 136,000

Tertinggi 147,000 147,000 135,000 160,000 170,000 180,000 136,000 176,000 170,000

- 19 mm (ulir) Btg Terendah 175,000 189,000 173,000 190,000 185,000 200,000 195,000 200,000 196,000

Tertinggi 207,000 207,000 175,000 225,000 200,000 225,000 205,000 220,000 200,200

2 Kawat Ikat Beton Kg Terendah 16,000 12,500 14,000 15,000 16,000 16,000 16,000 16,500 13,775

Tertinggi 22,000 16,000 17,000 16,000 17,000 18,000 17,000 17,000 17,000

3 Besi Strip Kg Terendah 17,500 17,500 17,500 17,000 23,000 23,000 20,000 23,000 20,000

Tertinggi 18,000 18,000 19,000 18,000 25,000 25,000 22,000 25,000 22,000

4 Besi Profil WF Kg Terendah 8,000 8,000 9,500 9,000 10,000 10,000 10,000 10,000 9,500

Tertinggi 9,500 9,500 10,500 10,000 11,000 11,000 10,500 11,000 10,500

VIII BAHAN PLAFOND

1 Eternit (1 x 1) Lbr Terendah 13,000 13,000 13,000 13,000 15,000 17,000 13,000 13,000 19,000

Tertinggi 15,000 14,000 15,000 14,000 17,000 18,000 14,000 14,900 22,000

2 Triplek 4 mm Lbr Terendah 50,000 50,000 51,000 55,000 55,000 57,000 52,500 55,000 52,500

Tertinggi 53,000 53,000 54,000 60,000 60,000 64,000 57,000 63,000 57,000

3 Triplek 3 mm (jati) Lbr Terendah 74,000 72,000 73,000 75,000 77,000 75,000 72,000 80,000 72,000

Tertinggi 80,000 74,000 75,000 80,000 85,000 80,000 75,000 85,000 75,000

4 Triplek 6 mm Lbr Terendah 65,000 63,000 63,000 60,000 72,000 72,000 65,000 73,000 67,500

Tertinggi 68,500 65,000 65,000 65,000 76,000 80,000 71,000 80,000 72,000

5 Gypsum 9 mm Lbr Terendah 55,000 47,000 55,000 60,000 68,000 60,000 60,000 55,000 62,500

Tertinggi 57,000 55,000 60,000 65,000 70,000 65,000 62,500 65,400 68,000

IX BAHAN PIPA

1 Galvanis (6 m)

- 2" Btg Terendah 365,000 365,000 370,000 375,000 372,500 380,000 365,000 400,000 365,000

Tertinggi 370,000 370,000 372,500 450,000 375,000 581,000 372,000 425,000 370,000

- 1,5" Btg Terendah 265,000 250,000 230,000 260,000 265,000 270,000 250,000 280,000 260,000

Tertinggi 350,000 320,000 255,000 360,000 276,400 406,000 265,000 300,000 321,930

- 1,25" Btg Terendah 210,000 210,000 195,000 220,000 222,000 200,000 195,000 250,000 210,000

Tertinggi 275,000 275,000 215,000 280,000 228,000 223,000 210,000 275,000 235,410

- 0,75" Btg Terendah 107,000 110,000 115,000 125,000 127,500 118,000 110,000 125,000 110,000

Tertinggi 160,000 120,000 125,000 165,000 136,200 130,000 125,000 130,000 122,500

- 0,50" Btg Terendah 99,000 99,000 105,000 110,000 125,000 115,000 99,000 115,000 99,000

Tertinggi 125,000 115,000 120,000 140,000 135,000 125,000 115,000 130,000 115,000

2 Pipa PVC AW (4 m')

- 1/2" Btg Terendah 22,000 17,500 18,000 19,000 20,000 20,000 15,000 22,000 15,000

Tertinggi 27,500 27,500 19,500 21,000 25,000 28,000 18,000 23,000 19,000

- 3/4" Btg Terendah 24,500 24,500 22,000 26,000 27,000 25,000 20,000 25,000 20,000

Page 12: Rab Puskesmas Tembuku II 15062012

NO. NAMA BARANG SATUAN HARGA BADUNG TABANAN BULELENG BANGLI GIANYARDENPASA

RJEMBRAN

AKARANG

ASEMKLUNGKU

NG - 3/4" Btg

Tertinggi 29,000 29,000 26,000 28,000 28,000 28,000 22,000 27,000 22,700

Page 13: Rab Puskesmas Tembuku II 15062012

NO. NAMA BARANG SATUAN HARGA BADUNG TABANAN BULELENG BANGLI GIANYARDENPASA

RJEMBRAN

AKARANG

ASEMKLUNGKU

NG

- 1" Btg Terendah 29,000 27,500 28,500 30,000 32,000 30,000 25,000 30,000 24,000

Tertinggi 32,400 37,000 32,500 33,000 35,000 33,000 28,000 35,000 29,500

- 1,5" Btg Terendah 49,000 49,400 50,000 52,000 56,700 68,000 50,000 57,500 50,000

Tertinggi 55,000 55,000 55,000 58,000 57,000 57,500 55,000 64,000 55,500

- 2" Btg Terendah 68,000 63,000 65,000 72,000 84,000 75,000 65,000 77,500 70,000

Tertinggi 80,000 68,000 70,000 87,000 85,000 82,000 70,000 97,000 80,000

- 2,5" Btg Terendah 95,500 97,500 95,000 100,000 108,000 100,000 94,000 105,000 96,000

Tertinggi 107,000 107,000 100,000 112,000 110,000 142,000 99,000 124,000 103,000

- 3" Btg Terendah 125,000 126,000 128,000 130,000 154,000 133,000 128,000 132,000 165,000

Tertinggi 162,700 163,000 165,000 167,000 224,000 167,000 165,000 177,000 240,000

- 4" Btg Terendah 208,200 210,000 212,000 230,000 235,000 212,500 215,000 225,000 242,000

Tertinggi 237,100 240,000 242,000 242,500 240,000 241,000 242,000 258,000 311,000

3 Pipa Listrik

- Paralon 5/8" Btg Terendah 8,000 6,000 7,000 6,000 8,000 6,000 6,000 8,000 10,395

Tertinggi 9,000 8,000 11,000 8,000 9,000 7,000 7,000 9,000 11,445

- Kran Air 1/2" BH Terendah 25,000 25,000 25,000 21,000 29,000 20,000 25,000 25,000 27,500

Tertinggi 30,000 30,000 30,000 25,000 35,000 25,000 30,000 32,000 31,605

- Sale tape BH Terendah 1,500 1,250 1,500 2,000 2,000 1,500 1,500 1,500 2,000

Tertinggi 2,000 2,000 2,000 3,300 3,000 2,000 2,000 2,000 3,780

X BAHAN FINISHING

1 Kayu

- Amplas Lbr Terendah 2,500 2,500 3,000 2,500 2,800 2,500 2,500 2,500 2,500

Tertinggi 5,000 3,000 4,000 3,000 3,000 3,000 3,000 3,400 3,000

- Meni Kg Terendah 18,000 18,500 19,000 20,000 20,900 20,000 24,000 22,000 24,000

Tertinggi 21,000 20,000 21,000 22,000 21,000 25,000 27,000 24,000 26,775

- Dempul Kg Terendah 20,000 22,000 20,000 22,000 20,000 25,000 22,000 22,000 21,000

Tertinggi 24,000 30,000 27,000 24,000 22,000 30,000 24,000 25,000 24,000

- Politur Kg Terendah 42,000 42,000 42,000 47,000 40,000 42,500 42,000 42,500 48,000

Tertinggi 47,500 47,500 52,000 58,000 47,500 48,000 48,000 48,000 52,920

- Cat Kayu Kg Terendah 42,000 43,500 47,000 50,000 50,000 45,000 43,000 45,000 50,000

Tertinggi 49,000 49,000 50,000 54,000 55,000 55,000 48,000 50,000 69,720

- Minyak Cat (Thinner) Klg Terendah 18,000 20,000 20,000 18,000 20,000 25,000 20,000 19,000 20,000

Tertinggi 21,000 22,000 25,000 20,000 22,000 27,000 21,500 21,000 21,000

2 Tembok

- Plamur Kg Terendah 10,000 8,000 10,000 15,000 27,600 13,000 11,000 12,000 26,000

Tertinggi 12,500 12,000 12,000 20,000 29,000 15,000 12,000 20,000 29,000

- Cat Kg Terendah 17,500 17,000 18,000 21,000 22,000 23,000 22,500 23,000 23,000

Tertinggi 21,000 20,000 25,000 30,000 24,000 25,000 25,000 30,000 25,000

3 Cat Besi Kg Terendah 48,000 42,000 42,500 45,000 43,400 55,000 45,000 45,000 45,000

Tertinggi 52,000 52,000 54,000 54,000 50,000 60,000 50,000 50,000 69,720

4 Cat Meni Besi Kg Terendah 22,500 21,500 22,000 25,000 24,000 23,000 22,000 20,700 22,000

Page 14: Rab Puskesmas Tembuku II 15062012

NO. NAMA BARANG SATUAN HARGA BADUNG TABANAN BULELENG BANGLI GIANYARDENPASA

RJEMBRAN

AKARANG

ASEMKLUNGKU

NG4 Cat Meni Besi Kg

Tertinggi 32,000 23,000 24,000 32,000 39,000 25,000 25,000 22,000 25,305

Page 15: Rab Puskesmas Tembuku II 15062012

NO. NAMA BARANG SATUAN HARGA BADUNG TABANAN BULELENG BANGLI GIANYARDENPASA

RJEMBRAN

AKARANG

ASEMKLUNGKU

NG

5 Minyak Bakisting Ltr Terendah 15,000 12,000 15,000 12,500 16,100 15,000 15,000 12,500 15,750

Tertinggi 17,000 17,000 18,000 15,000 17,000 18,000 18,000 17,500 18,000

6 Lem Kayu Kg Terendah 7,500 8,000 10,000 10,000 11,000 10,000 9,500 10,000 8,500

Tertinggi 12,000 12,500 12,000 12,000 12,000 12,000 12,000 12,000 12,000

7 Kuas 4" Bh Terendah 10,000 8,000 10,500 8,000 15,000 12,000 8,000 11,000 9,000

Tertinggi 16,000 14,000 13,000 12,000 18,000 15,000 10,000 12,000 12,000

XI BAHAN KACA

1 Bening 5 mm M2 Terendah 80,000 80,000 70,000 85,000 92,500 80,000 75,000 95,000 95,000

Tertinggi 82,500 85,000 75,000 90,000 95,000 95,000 80,000 100,000 187,635

2 Es/Kapur 3 mm M2 Terendah 70,000 70,000 72,000 75,000 80,000 75,000 72,000 100,000 110,000

Tertinggi 75,000 75,000 75,000 80,000 120,000 77,500 76,000 110,000 155,190

3 Rayben 5 mm M2 Terendah 90,000 90,000 92,000 100,000 100,000 100,000 95,000 109,000 110,000

Tertinggi 95,000 95,000 97,000 110,000 110,000 110,000 105,000 110,000 151,620

4 Nako + Tralis M2 Terendah 275,000 275,000 280,000 275,000 285,000 285,000 285,000 285,000 282,000

Tertinggi 280,000 280,000 285,000 280,000 280,000 290,000 290,000 290,000 335,895

XII BAHAN LISTRIK

1 - Sakelar Bj Terendah 15,000 12,000 12,500 12,500 12,500 12,500 12,000 13,000 12,000

Tertinggi 16,500 15,000 15,000 15,000 15,000 15,000 15,000 15,000 15,000

- Stop Kontak Bj Terendah 10,000 10,000 12,500 12,000 15,000 12,000 11,000 15,000 15,000

Tertinggi 15,000 15,000 15,000 15,000 20,000 15,000 15,000 20,000 20,000

- Fitting Bj Terendah 6,000 7,000 8,000 15,000 9,000 5,500 10,000 8,000 8,000

Tertinggi 7,000 11,000 10,000 16,000 15,000 7,500 12,000 10,000 10,000

- Steker Bj Terendah 6,000 6,000 6,500 7,000 8,000 8,000 10,000 6,000 8,800

Tertinggi 7,000 7,000 7,500 8,000 9,000 9,000 12,500 7,500 10,900

2 Kabel

M' Terendah 7,000 7,000 7,500 7,500 7,500 7,500 7,200 7,500 9,000

Tertinggi 8,000 8,000 8,000 8,000 8,000 8,000 8,000 8,000 11,000

M' Terendah 8,500 8,500 8,500 9,500 10,000 8,500 8,500 8,500 14,000

Tertinggi 9,000 9,000 9,000 10,000 12,000 9,000 9,000 9,000 18,000

3 Bola lampu

- SL 8 Watt Bj Terendah 22,000 22,000 22,000 22,500 22,500 22,000 24,000 22,500 22,000

Tertinggi 22,500 22,500 22,500 23,000 28,000 22,500 25,000 25,000 22,500

- SL 18 Watt Bj Terendah 27,500 27,500 27,500 27,500 29,000 28,000 30,000 28,500 28,000

Tertinggi 28,000 28,000 4,000 28,000 35,000 29,000 31,000 30,000 29,000

XIII ALAT PENGUNCI

- Kunci Gembok Bj Terendah 20,000 18,000 18,000 22,000 24,000 22,000 20,000 20,000 18,000

Tertinggi 35,000 20,000 20,000 30,000 35,000 24,000 22,000 22,000 20,000

- Grendel Bj Terendah 12,500 12,500 12,000 10,000 12,500 15,000 12,500 14,000 12,500

Tertinggi 15,000 14,000 16,000 12,500 14,000 18,000 15,000 15,000 15,000

- Kunci Slot Bj Terendah 92,500 93,000 95,000 110,000 110,000 100,000 95,000 115,000 105,000

Tertinggi 95,000 96,000 105,000 150,000 215,000 110,000 105,000 125,000 120,000

- NYM 2 x 2½ mm

- NYM 3 x 2½ mm

Page 16: Rab Puskesmas Tembuku II 15062012

NO. NAMA BARANG SATUAN HARGA BADUNG TABANAN BULELENG BANGLI GIANYARDENPASA

RJEMBRAN

AKARANG

ASEMKLUNGKU

NG

XIV ALAT PENGGANTUNG

- Engsel Kupu-kupu Set Terendah 20,000 20,000 20,500 21,000 24,000 21,000 20,000 24,000 22,000

Tertinggi 22,000 22,000 26,000 25,000 34,000 24,000 23,000 34,000 34,000

- Engsel Nilon Set Terendah 9,000 9,000 9,000 12,500 12,000 15,000 12,000 11,000 12,000

Tertinggi 12,000 12,000 12,000 15,000 15,100 18,000 15,000 12,500 16,000

- Kait Angin Set Terendah 15,000 15,000 16,000 15,000 17,500 16,000 15,000 16,000 16,000

Tertinggi 17,000 17,000 17,000 17,500 18,000 18,000 17,500 18,000 17,000

XV BAHAN SANITAIR

- Kloset Jongkok Porselin Bh Terendah 130,000 135,000 115,000 105,000 150,000 110,000 110,000 95,000 135,000

Tertinggi 135,000 145,000 150,000 115,000 165,000 156,000 120,000 105,000 181,000

- Kloset Duduk Bh Terendah 1,135,000 1,135,000 1,300,000 1,000,000 1,200,000 1,000,000 1,000,000 1,000,000 1,245,000

Tertinggi 1,150,000 1,145,000 1,500,000 1,050,000 1,700,000 1,250,000 1,250,000 1,020,000 2,406,000

- Bak Mandi (Fiber) 70 x 70 x 66 Cm Bh Terendah 180,000 250,000 185,000 195,000 220,000 225,000 160,000 185,000 225,000

Tertinggi 200,000 275,000 200,000 200,000 225,000 250,000 185,000 210,000 253,000

- Bak Mandi (Keramik) Bh Terendah 160,000 150,000 145,000 170,000 210,000 200,000 160,000 160,000 195,000

Tertinggi 175,000 165,000 150,000 180,000 231,000 278,000 350,000 184,000 205,000

- Wastafel Bh Terendah 260,000 260,000 220,000 250,000 265,000 280,000 225,000 250,000 280,000

Tertinggi 297,000 275,000 250,000 350,000 306,200 330,000 250,000 300,000 295,000

- Urinoir Bh Terendah 550,000 550,000 575,000 580,000 580,000 580,000 575,000 580,000 575,000

Tertinggi 575,000 575,000 580,000 585,000 585,000 585,000 599,000 585,000 599,000

- Selang Air 1/2' M' Terendah 5,500 3,500 5,000 3,250 3,500 5,000 4,200 4,250 4,000

Tertinggi 7,500 4,000 5,500 3,500 4,000 6,200 5,000 4,500 5,500

- Selang Air 3/4' M' Terendah 6,000 5,500 6,000 6,000 5,500 9,900 5,500 7,000 5,500

Tertinggi 8,500 9,500 6,500 6,500 6,000 10,000 6,000 7,500 9,000

XVI BAHAN PAKU

- Paku Lis Kg Terendah 15,000 15,000 14,000 15,000 18,000 18,000 17,000 18,000 16,000

Tertinggi 16,000 18,000 18,000 16,000 21,000 20,000 18,000 21,000 21,000

- Paku Reng Kg Terendah 16,000 13,000 12,000 12,000 13,000 15,000 14,000 12,500 13,755

Tertinggi 18,000 15,000 17,000 13,000 14,000 16,000 16,000 14,000 15,000

- Paku Usuk Kg Terendah 16,000 13,000 12,000 12,000 13,000 15,000 14,000 12,500 13,755

Tertinggi 18,000 15,000 17,000 13,000 14,000 24,000 16,000 14,000 15,000

- Paku Seng Kg Terendah 22,000 20,000 18,000 26,000 20,000 25,000 19,000 19,000 22,000

Tertinggi 25,000 25,000 20,000 25,000 22,000 27,000 22,000 20,000 24,000

- Paku Beton 5 cm Kg Terendah 18,000 18,000 10,000 12,000 15,000 14,000 12,000 15,000 17,500

Tertinggi 20,000 20,000 12,000 15,000 17,300 15,000 13,000 20,000 18,500

- Paku Skrup 1/2" Ktk Terendah 7,500 7,000 7,500 7,000 8,000 8,000 8,000 7,000 10,000

Tertinggi 9,000 8,500 9,000 9,000 9,500 9,900 9,000 9,000 19,000

- Paku Skrup 2" Ktk Terendah 19,000 19,000 20,000 21,000 21,000 22,500 20,000 21,000 22,000

Tertinggi 22,000 22,000 22,000 22,500 22,500 25,000 22,000 22,500 23,730

- Paku Skrup 3,5" Ktk Terendah 23,000 25,000 23,000 23,000 23,000 22,000 23,000 23,000 23,425

Tertinggi 24,000 24,000 25,000 25,000 25,000 24,000 24,000 25,000 25,000

Page 17: Rab Puskesmas Tembuku II 15062012

NO. NAMA BARANG SATUAN HARGA BADUNG TABANAN BULELENG BANGLI GIANYARDENPASA

RJEMBRAN

AKARANG

ASEMKLUNGKU

NG

- Paku Pancing 60 x 230 Bj Terendah 1,000 1,000 1,100 1,100 1,200 1,000 1,000 1,000 1,100

Tertinggi 1,100 1,100 1,300 1,300 1,500 1,500 1,500 1,500 1,300

Page 18: Rab Puskesmas Tembuku II 15062012

B. UPAH TENAGA

NO T E N A G A SATUAN HARGA BADUNG TABANAN BULELENG BANGLI GIANYAR

1 Mandor Hr Terendah 70,000 70,000 69,000 60,000 60,000 60,000 60,000 105,000 70,000 Tertinggi 75,000 75,000 70,000 65,000 65,000 65,000 65,000 109,860 75,000

2 Kepala Tukang Hr Terendah 65,000 65,000 60,000 60,000 60,000 60,000 60,000 75,000 65,000 Tertinggi 70,000 70,000 65,000 65,000 67,500 65,000 65,000 85,000 70,000

3 Tukang Besi Hr Terendah 60,000 55,000 55,000 55,000 55,000 55,000 55,000 70,000 55,000 Tertinggi 65,000 60,000 59,000 60,000 57,500 57,000 57,000 77,000 60,000

4 Tukang Batu Hr Terendah 55,000 55,000 55,000 55,000 55,000 55,000 55,000 60,000 55,000 Tertinggi 60,000 60,000 59,000 60,000 62,500 60,000 60,000 67,000 60,000

5 Tukang Kayu Hr Terendah 60,000 60,000 57,000 55,000 55,000 55,000 55,000 70,000 60,000 Tertinggi 65,000 65,000 59,000 59,000 67,500 60,000 59,000 76,000 65,000

6 Tukang Cat Hr Terendah 45,000 45,000 50,000 42,000 42,500 40,000 42,000 55,000 45,000 Tertinggi 50,000 50,000 59,000 43,000 45,000 45,000 43,000 64,000 50,400

7 Tukang Politur Hr Terendah 45,000 45,000 45,000 40,000 45,000 45,000 45,000 55,000 40,500 Tertinggi 50,000 50,000 50,000 45,000 47,500 50,000 50,000 61,000 45,000

8 Tukang Listrik Hr Terendah 45,000 45,000 57,000 45,000 45,000 45,000 45,000 55,000 45,000 Tertinggi 50,000 50,000 59,000 50,000 50,000 50,000 50,000 61,000 52,815

9 Tukang Pipa Hr Terendah 50,000 50,000 50,000 50,000 62,500 50,000 50,000 55,000 45,000 Tertinggi 55,000 55,000 59,000 55,000 55,000 55,000 55,000 61,000 50,400

10 Tukang Aspal Hr Terendah 40,000 50,000 40,000 40,000 40,000 40,000 40,000 6,000 45,000 Tertinggi 45,000 60,000 44,000 44,000 45,000 45,000 44,000 67,000 52,815

11 Tukang Masak Aspal Hr Terendah 40,000 50,000 40,000 40,000 45,000 40,000 40,000 50,000 45,000 Tertinggi 45,000 55,000 45,000 45,000 70,000 45,000 45,000 55,000 52,815

12 Pekerja Hr Terendah 35,000 35,000 34,000 34,000 35,000 30,000 34,000 40,000 38,325 Tertinggi 40,000 40,000 35,000 35,000 40,000 35,000 35,000 44,000 40,000

13 Tukang Gali Hr Terendah 40,000 40,000 40,000 40,000 40,000 40,000 40,000 45,000 40,000 Tertinggi 45,000 45,000 42,000 42,000 55,000 45,000 42,000 49,000 42,000

Pek. Style Bali

14 Tukang Ukir Hr Terendah 75,000 75,000 75,000 75,000 70,000 70,000 75,000 85,000 102,637 Tertinggi 80,000 80,000 80,000 80,000 85,000 75,000 80,000 92,000 183,000

15 Pas. Atap Alang-alang Hr Terendah 70,000 70,000 70,000 70,000 73,700 70,000 70,000 70,000 70,000 Tertinggi 75,000 75,000 75,000 75,000 70,000 75,000 75,000 75,000 75,000

16 Pas. Bata Gosok Dua Muka Hr Terendah 285,000 275,000 250,000 285,000 250,000 250,000 285,000 300,000 300,000 Tertinggi 289,000 280,000 270,000 289,000 270,000 270,000 289,000 358,000 380,000

17 Pas. Batu Paras Diukir Hr Terendah 300,000 310,000 280,000 300,000 280,000 275,000 300,000 288,500 280,000 Tertinggi 309,000 320,000 288,500 309,000 288,500 280,000 309,000 382,000 362,250

18 Pas. Batu Paras Siap Diukir Hr Terendah 260,000 265,000 245,000 260,000 245,000 245,000 260,000 288,500 280,000 Tertinggi 267,000 270,000 249,500 267,000 249,500 249,500 267,000 382,000 362,250

DENPASAR

JEMBRANA

KARANG ASEM

KLUNGKUNG

Page 19: Rab Puskesmas Tembuku II 15062012

Halaman 19

DAFTAR HARGA SATUANBAHAN BANGUNAN DAN UPAH

Kodya Denpasar

NO. U R A I A N SATUAN

A BAHAN PASANGAN & URUGAN 1 Batu belah m3 145,000 2 Koral beton m3 90,000 3 Koral biasa m3 67,000 4 Limestone m3 125,000 5 Pasir urug m3 63,000 6 Pasir beton m3 90,000 7 Pasir pasang m3 100,000 8 Tanah urug m3 65,000 9 Sirtu m3 67,000 10 Semen portland kg 1,100 11 Semen warna kg 15,000 12 Batu bata bj 1,200 13 Batako bj 1,800 14 Kerawang beton bj 4,500 15 Kansteen beton 15x20x50 (segi lima) bj 21,500 16 Kansteen beton 15x20x50 (bulat) bj 29,000 17 Paving block 20x20 tebal 6 cm K-175 m2 58,450 18 Paving block 20x20 tebal 6 cm K-225 m2 61,300 19 Paving block 20x20 tebal 8 cm K-175 m2 67,950 20 Paving block 20x20 tebal 8 cm K-225 m2 70,800 21 Paving block 20x20 tebal 8 cm K-300 m2 81,000 22 Paving block 20x20 tebal 8 cm K-400 m2 96,450

B BAHAN PLAFOND & LANTAI 1 Plywood 3 mm (Jati) lbr 75,000 2 Plywood 4 mm lbr 57,000 3 Plywood 6 mm lbr 72,000 4 Plywood 9 mm lbr 110,000 5 Plywood 12 mm lbr 135,000 6 Gypsum 9 mm lbr 60,000 7 Kalsiboard 4,5 mm lbr 85,000 8 Gedeg kulit kw. I m2 24,000 9 Paku Peluru bh 375 10 Siku Gantung (Angle Clip) pcs 2,000 11 Suspension Rod Soft btg 12,000 12 Suspension Rod Clip btg 10,000 13 C Channel Lengkung btg 52,500 14 Metal Furring btg 44,000 15 Furring Clamp pcs 2,000 16 Screw Ø 3/8 pcs 250 17 Metal Siku 20x20 mm btg 15,000 18 Screw 6x1 pcs 350 19 Textile Tape rol 15,000 20 Cornice adhesive kg 5,200 21 Lis plafond kayu profil 2/5 cm m' 10,500 22 Lis plafond kayu profil 7 cm m' 16,250 23 Lis plafond gypsum 2/5 cm m' 2,250 24 Lis plafond gypsum 5 cm m' 3,250 25 Lis plafond gypsum 9 cm m' 5,750 26 Keramik 40/40 anti slip m2 56,100 27 Keramik 40/40 polos m2 51,000 28 Keramik 30/30 anti slip m2 40,700 29 Keramik 30/30 polos m2 37,000 30 Keramik 20/25 polos m2 45,000 31 Keramik 20/20 anti slip m2 44,000 32 Keramik 20/20 polos m2 40,000 33 Step nosing tangga 8/30 bh 3,700 34 Step nosing tangga 8/40 bh 4,800 35 Plint keramik 10/40 bh 4,200 36 Plint keramik 10/30 bh 4,025 37 Lis keramik dinding 5/20 bh 3,200 38 Lis keramik dinding 7/20 bh 3,900

HARGA (Rp)

C15
Gresik
Page 20: Rab Puskesmas Tembuku II 15062012

Halaman 20

NO. U R A I A N SATUAN HARGA (Rp)

C BAHAN KAYU DAN BAMBU 1 Kayu kamper papan m3 8,200,000 2 Kayu kamper balok m3 7,500,000 3 Kayu kamper usuk m3 7,200,000 4 Kayu kamper reng m3 5,001,000 5 Kayu kruing papan m3 6,100,000 6 Kayu kruing balok m3 5,000,000 7 Kayu kruing usuk m3 4,800,000 8 Kayu kruing reng m3 5,834,500 9 Kayu bekesting papan m3 1,750,000 10 Kayu bekesting balok m3 2,500,000 11 Kayu bekesting usuk m3 2,000,000 12 Kayu bekesting reng m3 3,083,950 13 Doken kayu Ø 8 - 10/400 cm btg 25,000 14 Formite/penjaga jarak bekisting bh 10,000 15 Seseh balok m3 3,000,000 16 Bambu besar btg 11,000 17 Bambu sedang btg 10,000

D BAHAN KACA 1 Kaca bening 3 mm m2 86,000 2 Kaca bening 5 mm m2 80,000 3 Kaca bening 8 mm m2 115,000 4 Kaca es 3 mm m2 75,000 5 Kaca es 5 mm m2 127,500 6 Kaca tempered 12 mm m2 1,750,000 7 Kaca cermin 5 mm m2 90,000 8 Kaca cermin 8 mm m2 125,000 9 Glass block bh 25,000 10 Sealant btl 35,000

E BAHAN ATAP 1 Genteng biasa, atap bj 1,300 2 Genteng biasa, bubungan bj 2,500 3 Genteng kodok karang pilang, atap bj 3,800 4 Genteng kodok karang pilang, bubungan bj 6,000 5 Genteng palentong besar, atap bj 1,700 6 Genteng palentong besar, bubungan bj 6,000 7 Genteng metal berpasir, atap m2 95,000 8 Genteng metal berpasir, bubungan lbr 25,000 9 Aluminium foil m2 37,500 10 Murda paras bh 145,000 11 Murda fiber bh 450,000 12 Ikut Celedu paras bh 85,000 13 Ikut Celedu fiber bh 360,000

F BAHAN BESI & ALUMINIUM 1 Paku Lis kg 18,000 2 Paku reng kg 15,000 3 Paku usuk kg 15,000 4 Paku seng kg 25,000 5 Paku sekrup kg 22,500 6 Paku beton kg 14,000 7 Paku pancing Bj 1,000 8 Sekrup fixer Bj 350 9 Besi beton kg 9,600 10 Kawat beton kg 16,000 11 Besi strip kg 23,000 12 Kusen aluminium 3" polos m' 70,000 13 Kusen aluminium 4" polos m' 81,000 14 Rangka daun pintu aluminium 38/100 mm polos m' 52,000 15 Rangka daun jendela aluminium 30/70 mm polos m' 45,000 16 Aluminium spandrel m2 78,000 17 Aluminium jeruk lbr 125,000 18 Rolling door aluminium m2 325,000 19 Pintu lipat besi m2 825,000

Page 21: Rab Puskesmas Tembuku II 15062012

Halaman 21

NO. U R A I A N SATUAN HARGA (Rp)

G BAHAN FINISHINGKayu :

1 Cat meni kg 20,000 2 Cat kayu dasar kg 30,000 3 Cat kayu kg 45,000 4 Clear gloss ltr 45,000 5 Dempul kg 25,000 6 Impra ltr 23,500 7 Politur ltr 48,000 8 Vernis ltr 42,000 9 Thinner ltr 25,000 10 Amplas lbr 2,500 11 Kuas bh 12,000 12 Lem kayu kg 10,000 13 Minyak Bekisting ltr 15,000

Tembok : 1 Plamur tembok kg 13,000 2 Cat tembok dasar kg 21,000 3 Cat tembok setara Vinilex kg 35,000 4 Coating kg 44,500 5 Waterproofing kg 50,000

H BAHAN SANITASI 1 Bak cuci steinless steel bh 375,000 2 Bak mandi fiber 70 x 70 x 66 cm bh 250,000 3 Shower bh 235,000 4 Kloset duduk bh 1,450,000 5 Kloset jongkok bh 235,000 6 Wastafel bh 350,000 7 Floor Drain bh 190,000 8 Roof Drain bh 175,000 9 Urinoir bh 625,000 10 Jet Washer bh 185,000 11 Kran air wastafel bh 165,000 12 Kran air leher angsa bh 180,000 13 Kran air biasa 1/2" bh 90,000 14 Tempat sabun bh 120,000 15 Tempat tissu bh 125,000 16 Seal Tape bh 2,000

I BAHAN PIPA 1 Pipa PVC Tipe AW Ø ½" m' 5,000 2 Pipa PVC Tipe AW Ø ¾" m' 6,250 3 Pipa PVC Tipe AW Ø 1" m' 7,500 4 Pipa PVC Tipe AW Ø 1½" m' 17,000 5 Pipa PVC Tipe AW Ø 2" m' 18,750 6 Pipa PVC Tipe AW Ø 2½" m' 25,000 7 Pipa PVC Tipe AW Ø 3" m' 33,250 8 Pipa PVC Tipe AW Ø 4" m' 53,125

J BAHAN PENGGANTUNG 1 Handle pintu steinless steel bulat bh 162,500 2 Handle pintu steinless steel kotak bh 137,500 3 Handle pintu aluminium (comb) bh 80,000 4 Kunci pintu bulat stainless steel bh 125,000 5 Kunci pintu tanam 2x putar bh 175,000 6 Kunci pintu selot bh 135,000 7 Kunci pintu KM/WC bulat bh 85,000 8 Engsel Pintu bh 75,000 9 Engsel Jendela bh 65,000 10 Grendel jendela bh 57,500 11 Kait Angin bh 45,000 12 Espagnoleth bh 125,000 13 Door Stop bh 85,000 14 Door Closer bh 225,000

C160
ex. Royal
Page 22: Rab Puskesmas Tembuku II 15062012

Halaman 22

NO. U R A I A N SATUAN HARGA (Rp)

K BAHAN MEKANIKAL & ELEKTRIKAL 1 Lampu SL 23 Watt setara Philips bh 45,000 2 Lampu SL 11 Watt setara Philips bh 37,500 3 Lampu RMI 2 x 36 Watt setara Philips bh 450,000 4 Lampu RMI 2 x 18 Watt setara Philips bh 385,000 5 Kipas angin ceiling fan set 435,000 6 Kipas angin wall fan set 275,000 7 Exhaust fan 12" setara Panasonic set 400,000 8 Exhaust ceiling 8" setara Panasonic set 310,000 9 Stop kontak setara Clipsall bh 55,000 10 Stop kontak AC setara Clipsall bh 78,000 11 Saklar tunggal setara Clipsall bh 40,000 12 Saklar ganda setara Clipsall bh 50,500 13 Outlet TV setara Clipsall bh 175,000 14 Outlet telepon setara Clipsall bh 175,000 15 NYM 2 x 2,5 mm Ex. Supreme m' 10,200 16 NYM 3 x 2,5 mm Ex. Supreme m' 14,000 17 Pipa conduit 5/8" m' 9,500 18 Tee duss bh 5,000 19 Klem bj 700 20 Shock bj 750 21 Imbowduss bj 4,500

L BAHAN STYLE BALI 1 Paras Sarwagenep bh 12,500 2 Batu Palimanan bh 11,000 3 Batu Lahar Karangasem bh 10,000 4 Koral sikat zak 27,500

M TENAGA KERJA 1 Mandor org/hr 65,000 2 Kepala tukang org/hr 60,000 3 Kepala Tukang Style Bali org/hr 90,000 4 Tukang batu org/hr 55,000 5 Tukang kayu org/hr 55,000 6 Tukang besi org/hr 55,000 7 Tukang cat org/hr 40,000 8 Tukang Style Bali org/hr 70,000 9 Pekerja org/hr 30,000

Page 23: Rab Puskesmas Tembuku II 15062012

ANALISA BIAYA KONSTRUKSI (ABK)

NO. U R A I A N H A R G A

SATUAN BAHAN UPAH JUMLAH

A PEKERJAAN PERSIAPAN

A.1 1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK 0.0120 M3 Kayu bekesting usuk ### 24,000.00 0.0200 Kg Paku usuk 15,000.00 300.00 0.0070 M3 Kayu bekesting papan ### 12,250.00 0.1000 OH Pekerja 30,000.00 3,000.00 0.1000 OH Tukang Kayu 55,000.00 5,500.00 0.0100 OH Kepala tukang 60,000.00 600.00 0.0050 OH Mandor 65,000.00 325.00

36,550.00 9,425.00 45,975.00 A.2 1 M2 PEMBERSIHAN LAHAN

0.1000 OH Pekerja 30,000.00 3,000.00 0.0500 OH Mandor 65,000.00 3,250.00

6,250.00 6,250.00 A.3 1 M3 PEMBONGKARAN BETON BERTULANG

6.6670 OH Pekerja 30,000.00 200,010.00 0.3330 OH Mandor 65,000.00 21,645.00

221,655.00 221,655.00 A.4 1 M3 PEMBONGKARAN TEMBOK BATU BATA

6.6670 OH Pekerja 30,000.00 200,010.00 0.0330 OH Mandor 65,000.00 2,145.00

202,155.00 202,155.00 Untuk 1 m2 Pembongkaran Tembok Batu Bata 1/2 30,323.25

B PEKERJAAN TANAH DAN PASIR

B.1 1 M3 GALIAN TANAH KERAS SEDALAM 1 M 1.0000 OH Pekerja 30,000.00 30,000.00 0.0330 OH Mandor 65,000.00 2,145.00

32,145.00 32,145.00 B.2 1 M3 GALIAN TANAH BIASA SEDALAM 1 M

0.7500 OH Pekerja 30,000.00 22,500.00 0.0250 OH Mandor 65,000.00 1,625.00

24,125.00 24,125.00 B.3 1 M3 GALIAN TANAH BIASA SEDALAM 2 M

0.900 OH Pekerja 30,000.00 27,000.00 0.045 OH Mandor 65,000.00 2,925.00

29,925.00 29,925.00 B.3 1 M3 URUGAN KEMBALI SEDALAM 1 M

0.2250 OH Pekerja 30,000.00 6,750.00 0.0075 OH Mandor 65,000.00 487.50

7,237.50 7,237.50 B.4 1 M3 URUGAN DIRATAKAN

1.2000 M3 Koral biasa 67,000.00 80,400.00 1.2000 M3 Pasir urug 63,000.00 75,600.00 1.2000 M3 Tanah urug 65,000.00 78,000.00 1.2000 M3 Limestone 125,000.00 150,000.00 0.2500 OH Pekerja 30,000.00 7,500.00 0.0250 OH Mandor 65,000.00 1,625.00

Koral biasa 80,400.00 9,125.00 89,525.00 Pasir urug 75,600.00 9,125.00 84,725.00

Tanah urug 78,000.00 9,125.00 87,125.00 Limestone 150,000.00 9,125.00 159,125.00

B.5 1 M2 PEMADATAN TANAH (PER 20 CM) 0.5000 OH Pekerja 30,000.00 15,000.00 0.0500 OH Mandor 65,000.00 3,250.00

18,250.00 18,250.00

C PEKERJAAN PONDASI

C.1 1 M3 PASANG BATU KOSONG 1.2000 M3 Batu belah 145,000.00 174,000.00 0.4320 M3 Pasir urug 63,000.00 27,216.00 0.7800 OH Pekerja 30,000.00 23,400.00 0.3900 OH Tukang Batu 55,000.00 21,450.00 0.0390 OH Kepala tukang 60,000.00 2,340.00 0.0390 OH Mandor 65,000.00 2,535.00

201,216.00 49,725.00 250,941.00

Page 24: Rab Puskesmas Tembuku II 15062012

NO. U R A I A N H A R G A

SATUAN BAHAN UPAH JUMLAH C.2 1 M3 PASANG PONDASI BATU BELAH CAMP. 1 : 5

1.2000 M3 Batu belah 145,000.00 174,000.00 ### Kg Semen portland 1,100.00 149,600.00

0.5440 M3 Pasir pasang 100,000.00 54,400.00 1.5000 OH Pekerja 30,000.00 45,000.00 0.7500 OH Tukang Batu 55,000.00 41,250.00 0.0750 OH Kepala tukang 60,000.00 4,500.00 0.0750 OH Mandor 65,000.00 4,875.00

378,000.00 95,625.00 473,625.00

D PEKERJAAN BETON

D.1 1 M3 PEKERJAAN BETON LANTAI KERJA K-100 ### Kg Semen portland 1,100.00 253,000.00

0.6379 M3 Pasir beton 90,000.00 57,407.14 0.7607 M3 Koral beton 90,000.00 68,466.67 1.2000 OH Pekerja 30,000.00 36,000.00 0.2000 OH Tukang Batu 55,000.00 11,000.00 0.0200 OH Kepala tukang 60,000.00 1,200.00 0.0600 OH Mandor 65,000.00 3,900.00

378,873.81 52,100.00 430,973.81 D.2 1 M3 PEKERJAAN BETON K-175

### Kg Semen portland 1,100.00 358,600.00 0.5429 M3 Pasir beton 90,000.00 48,857.14 0.7622 M3 Koral beton 90,000.00 68,600.00 1.6500 OH Pekerja 30,000.00 49,500.00 0.2750 OH Tukang Batu 55,000.00 15,125.00 0.0275 OH Kepala tukang 60,000.00 1,650.00 0.0830 OH Mandor 65,000.00 5,395.00

476,057.14 71,670.00 547,727.14 D.3 1 M3 PEKERJAAN BETON K-225

### Kg Semen portland 1,100.00 408,100.00 0.4986 M3 Pasir beton 90,000.00 44,871.43 0.7756 M3 Koral beton 90,000.00 69,800.00 1.6500 OH Pekerja 30,000.00 49,500.00 0.2750 OH Tukang Batu 55,000.00 15,125.00 0.0275 OH Kepala tukang 60,000.00 1,650.00 0.0830 OH Mandor 65,000.00 5,395.00

522,771.43 71,670.00 594,441.43 D.4 1 M3 PEKERJAAN BETON K-275

### Kg Semen portland 1,100.00 446,600.00 0.4886 M3 Pasir beton 90,000.00 43,971.43 0.7607 M3 Koral beton 90,000.00 68,466.67 1.6500 OH Pekerja 30,000.00 49,500.00 0.2750 OH Tukang Batu 55,000.00 15,125.00 0.0275 OH Kepala tukang 60,000.00 1,650.00 0.0830 OH Mandor 65,000.00 5,395.00

559,038.10 71,670.00 630,708.10 D.5 1 KG PEMBESIAN DENGAN BESI POLOS/ULIR

1.0500 Kg Besi beton 9,600.00 10,080.00 0.0150 Kg Kawat Beton 16,000.00 240.00 0.0070 OH Pekerja 30,000.00 210.00 0.0070 OH Tukang Besi 55,000.00 385.00 0.0007 OH Kepala tukang 60,000.00 42.00 0.0004 OH Mandor 65,000.00 26.00

10,530.00 453.00 10,983.00 D.6 1 M2 PASANG BEKISTING UNTUK PONDASI

0.0400 M3 Kayu bekesting papan ### 70,000.00 0.3000 Kg Paku usuk 15,000.00 4,500.00 0.1000 Ltr Minyak Bekisting 15,000.00 1,500.00 0.5200 OH Pekerja 30,000.00 15,600.00 0.2600 OH Tukang Kayu 55,000.00 14,300.00 0.0260 OH Kepala tukang 60,000.00 1,560.00 0.0260 OH Mandor 65,000.00 1,690.00

76,000.00 33,150.00 109,150.00

Page 25: Rab Puskesmas Tembuku II 15062012

NO. U R A I A N H A R G A

SATUAN BAHAN UPAH JUMLAH D.7 1 M2 PASANG BEKISTING UNTUK SLOOF

0.0450 M3 Kayu bekesting papan ### 78,750.00 0.3000 Kg Paku usuk 15,000.00 4,500.00 0.1000 Ltr Minyak Bekisting 15,000.00 1,500.00 0.5200 OH Pekerja 30,000.00 15,600.00 0.2600 OH Tukang Kayu 55,000.00 14,300.00 0.0260 OH Kepala tukang 60,000.00 1,560.00 0.0260 OH Mandor 65,000.00 1,690.00

84,750.00 33,150.00 117,900.00 D.8 1 M2 PASANG BEKISTING UNTUK KOLOM

0.0400 M3 Kayu bekesting papan ### 70,000.00 0.4000 Kg Paku usuk 15,000.00 6,000.00 0.2000 Ltr Minyak Bekisting 15,000.00 3,000.00 0.0150 M3 Kayu bekesting balok ### 37,500.00 0.3500 Lbr Plywood 9 mm 110,000.00 38,500.00 2.0000 Btg Doken kayu Ø 8 - 10/400 cm 25,000.00 50,000.00 0.6600 OH Pekerja 30,000.00 19,800.00 0.3300 OH Tukang Kayu 55,000.00 18,150.00 0.0330 OH Kepala tukang 60,000.00 1,980.00 0.0330 OH Mandor 65,000.00 2,145.00

205,000.00 42,075.00 247,075.00 D.9 1 M2 PASANG BEKISTING UNTUK BALOK

0.0400 M3 Kayu bekesting papan ### 70,000.00 0.4000 Kg Paku usuk 15,000.00 6,000.00 0.2000 Ltr Minyak Bekisting 15,000.00 3,000.00 0.0180 M3 Kayu bekesting balok ### 45,000.00 0.3500 Lbr Plywood 9 mm 110,000.00 38,500.00 2.0000 Btg Doken kayu Ø 8 - 10/400 cm 25,000.00 50,000.00 0.6600 OH Pekerja 30,000.00 19,800.00 0.3300 OH Tukang Kayu 55,000.00 18,150.00 0.0330 OH Kepala tukang 60,000.00 1,980.00 0.0330 OH Mandor 65,000.00 2,145.00

212,500.00 42,075.00 254,575.00 D.10 1 M2 PASANG BEKISTING UNTUK LANTAI

0.0400 M3 Kayu bekesting papan ### 70,000.00 0.4000 Kg Paku usuk 15,000.00 6,000.00 0.2000 Ltr Minyak Bekisting 15,000.00 3,000.00 0.0150 M3 Kayu bekesting balok ### 37,500.00 0.3500 Lbr Plywood 9 mm 110,000.00 38,500.00 6.0000 Btg Doken kayu Ø 8 - 10/400 cm 25,000.00 150,000.00 0.6600 OH Pekerja 30,000.00 19,800.00 0.3300 OH Tukang Kayu 55,000.00 18,150.00 0.0330 OH Kepala Tukang 60,000.00 1,980.00 0.0330 OH Mandor 65,000.00 2,145.00

305,000.00 42,075.00 347,075.00 D.11 1 M2 PASANG BEKISTING UNTUK TANGGA

0.0300 M3 Kayu bekesting papan ### 52,500.00 0.4000 Kg Paku usuk 15,000.00 6,000.00 0.1500 Ltr Minyak Bekisting 15,000.00 2,250.00 0.0150 M3 Kayu bekesting balok ### 37,500.00 0.3500 Lbr Plywood 9 mm 110,000.00 38,500.00 2.0000 Btg Doken kayu Ø 8 - 10/400 cm 25,000.00 50,000.00 0.6600 OH Pekerja 30,000.00 19,800.00 0.3300 OH Tukang Kayu 55,000.00 18,150.00 0.0330 OH Kepala Tukang 60,000.00 1,980.00 0.0330 OH Mandor 65,000.00 2,145.00

186,750.00 42,075.00 228,825.00

Page 26: Rab Puskesmas Tembuku II 15062012

NO. U R A I A N H A R G A

SATUAN BAHAN UPAH JUMLAH D.12 1 M3 MEMBUAT PONDASI BETON BERTULANG K-225

1.0000 M3 Beton K-225 594,441.43 594,441.43 5.0000 M2 Bekisting untuk sloef 109,150.00 545,750.00 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 2,238,491.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 2,348,321.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 2,458,151.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 2,567,981.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 2,677,811.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 2,787,641.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 2,897,471.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 3,007,301.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 3,117,131.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 3,226,961.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 3,336,791.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 3,446,621.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 3,556,451.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 3,666,281.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 3,776,111.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 3,885,941.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 3,995,771.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 4,105,601.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 4,215,431.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 4,325,261.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 4,435,091.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 4,544,921.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 4,654,751.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 4,764,581.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 4,874,411.43 1 m3 membuat pondasi beton bertulang K-225 ### 10,983.00 ### 4,984,241.43

D.13 1 M3 MEMBUAT SLOEF BETON BERTULANG K-225 1.0000 M3 Beton K-225 594,441.43 594,441.43 6.0000 M2 Bekisting untuk sloef 117,900.00 707,400.00

1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 2,400,141.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 2,509,971.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 2,619,801.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 2,729,631.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 2,839,461.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 2,949,291.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 3,059,121.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 3,168,951.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 3,278,781.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 3,388,611.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 3,498,441.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 3,608,271.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 3,718,101.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 3,827,931.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 3,937,761.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 4,047,591.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 4,157,421.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 4,267,251.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 4,377,081.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 4,486,911.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 4,596,741.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 4,706,571.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 4,816,401.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 4,926,231.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 5,036,061.43 1 m3 membuat sloef beton bertulang K-225 ### 10,983.00 ### 5,145,891.43

Page 27: Rab Puskesmas Tembuku II 15062012

NO. U R A I A N H A R G A

SATUAN BAHAN UPAH JUMLAH D.14 1 M3 MEMBUAT KOLOM BETON BERTULANG K-225

1.0000 M3 Beton K-225 594,441.43 594,441.43 10.0000 M2 Bekisting untuk kolom 247,075.00 ###1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 4,163,491.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 4,273,321.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 4,383,151.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 4,492,981.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 4,602,811.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 4,712,641.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 4,822,471.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 4,932,301.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 5,042,131.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 5,151,961.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 5,261,791.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 5,371,621.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 5,481,451.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 5,591,281.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 5,701,111.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 5,810,941.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 5,920,771.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 6,030,601.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 6,140,431.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 6,250,261.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 6,360,091.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 6,469,921.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 6,579,751.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 6,689,581.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 6,799,411.43 1 m3 membuat kolom beton bertulang K-225 ### 10,983.00 ### 6,909,241.43

D.15 1 M3 MEMBUAT BALOK BETON BERTULANG K-225 1.0000 M3 Beton K-225 594,441.43 594,441.43 8.0000 M2 Bekisting untuk balok 254,575.00 ###

1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 3,729,341.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 3,839,171.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 3,949,001.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 4,058,831.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 4,168,661.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 4,278,491.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 4,388,321.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 4,498,151.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 4,607,981.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 4,717,811.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 4,827,641.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 4,937,471.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 5,047,301.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 5,157,131.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 5,266,961.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 5,376,791.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 5,486,621.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 5,596,451.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 5,706,281.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 5,816,111.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 5,925,941.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 6,035,771.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 6,145,601.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 6,255,431.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 6,365,261.43 1 m3 membuat balok beton bertulang K-225 ### 10,983.00 ### 6,475,091.43

D.16 1 M3 MEMBUAT PLAT LANTAI BETON BERTULANG K-225 1.0000 M3 Beton K-225 594,441.43 594,441.43 8.0000 M2 Bekisting untuk lantai 347,075.00 ###

1 m3 membuat plat lantai beton bertulang K-225 ### 10,983.00 ### 4,469,341.43 1 m3 membuat plat lantai beton bertulang K-225 ### 10,983.00 ### 4,579,171.43 1 m3 membuat plat lantai beton bertulang K-225 ### 10,983.00 ### 4,689,001.43 1 m3 membuat plat lantai beton bertulang K-225 ### 10,983.00 ### 4,798,831.43 1 m3 membuat plat lantai beton bertulang K-225 ### 10,983.00 ### 4,908,661.43 1 m3 membuat plat lantai beton bertulang K-225 ### 10,983.00 ### 5,018,491.43 1 m3 membuat plat lantai beton bertulang K-225 ### 10,983.00 ### 5,128,321.43 1 m3 membuat plat lantai beton bertulang K-225 ### 10,983.00 ### 5,238,151.43 1 m3 membuat plat lantai beton bertulang K-225 ### 10,983.00 ### 5,347,981.43 1 m3 membuat plat lantai beton bertulang K-225 ### 10,983.00 ### 5,457,811.43 1 m3 membuat plat lantai beton bertulang K-225 ### 10,983.00 ### 5,567,641.43

Page 28: Rab Puskesmas Tembuku II 15062012

NO. U R A I A N H A R G A

SATUAN BAHAN UPAH JUMLAH D.17 1 M3 MEMBUAT PLAT TANGGA BETON BERTULANG K-225

1.0000 M3 Beton K-225 594,441.43 594,441.43 7.0000 M2 Bekisting untuk lantai 347,075.00 ###

1 m3 membuat plat tangga beton bertulang K-225 ### 10,983.00 ### 4,122,266.43 1 m3 membuat plat tangga beton bertulang K-225 ### 10,983.00 ### 4,232,096.43 1 m3 membuat plat tangga beton bertulang K-225 ### 10,983.00 ### 4,341,926.43 1 m3 membuat plat tangga beton bertulang K-225 ### 10,983.00 ### 4,451,756.43 1 m3 membuat plat tangga beton bertulang K-225 ### 10,983.00 ### 4,561,586.43 1 m3 membuat plat tangga beton bertulang K-225 ### 10,983.00 ### 4,671,416.43 1 m3 membuat plat tangga beton bertulang K-225 ### 10,983.00 ### 4,781,246.43 1 m3 membuat plat tangga beton bertulang K-225 ### 10,983.00 ### 4,891,076.43 1 m3 membuat plat tangga beton bertulang K-225 ### 10,983.00 ### 5,000,906.43 1 m3 membuat plat tangga beton bertulang K-225 ### 10,983.00 ### 5,110,736.43 1 m3 membuat plat tangga beton bertulang K-225 ### 10,983.00 ### 5,220,566.43

D.18 1 M' KOLOM PENGUAT BETON BERTULANG 11 x 11 CM 0.0020 M3 Kayu bekesting papan ### 3,500.00 0.0100 Kg Paku usuk 15,000.00 150.00 3.0000 Kg Besi Beton 9,600.00 28,800.00 0.4500 Kg Kawat Beton 16,000.00 7,200.00 4.0000 Kg Semen Portland 1,100.00 4,400.00 0.0060 M3 Pasir Beton 90,000.00 540.00 0.0090 M3 Koral beton 90,000.00 810.00 0.1800 OH Pekerja 30,000.00 5,400.00 0.0200 OH Tukang Batu 55,000.00 1,100.00 0.0200 OH Tukang Kayu 55,000.00 1,100.00 0.0200 OH Tukang Besi 55,000.00 1,100.00 0.0060 OH Kepala tukang 60,000.00 360.00 0.0090 OH Mandor 65,000.00 585.00

45,400.00 9,645.00 55,045.00 D.19 1 M' RING BALOK BETON BERTULANG 10 x 15 CM

0.0030 M3 Kayu bekesting papan ### 5,250.00 0.0200 Kg Paku usuk 15,000.00 300.00 3.6000 Kg Besi Beton 9,600.00 34,560.00 0.0500 Kg Kawat Beton 16,000.00 800.00 5.5000 Kg Semen Portland 1,100.00 6,050.00 0.0090 M3 Pasir Beton 90,000.00 810.00 0.0150 M3 Koral beton 90,000.00 1,350.00 0.2970 OH Pekerja 30,000.00 8,910.00 0.0330 OH Tukang Batu 55,000.00 1,815.00 0.0330 OH Tukang Kayu 55,000.00 1,815.00 0.0330 OH Tukang Besi 55,000.00 1,815.00 0.0100 OH Kepala tukang 60,000.00 600.00 0.0150 OH Mandor 65,000.00 975.00

49,120.00 15,930.00 65,050.00

E PEKERJAAN KUSEN PINTU DAN JENDELA

E.1 1 M' PEKERJAAN KUSEN PINTU DAN JENDELA ALUMINIUM 1.1000 M' Kusen aluminium 4" polos 81,000.00 89,100.00 1.1000 M' Kusen aluminium 3" polos 70,000.00 77,000.00 2.0000 Bh Sekrup fixer 350.00 700.00 0.0600 Btl Sealant 35,000.00 2,100.00 0.0430 OH Pekerja 30,000.00 1,290.00 0.0430 OH Tukang besi 55,000.00 2,365.00 0.0043 OH Kepala Tukang 60,000.00 258.00 0.0021 OH Mandor 65,000.00 136.50

Kusen aluminium 4" polos 91,900.00 4,049.50 95,949.50 Kusen aluminium 3" polos 79,800.00 4,049.50 83,849.50

E.2 1 M2 PEKERJAAN DAUN PINTU & JENDELA ALUMINIUM 4.4000 M' Rangka daun pintu aluminium 38/100 mm polos 52,000.00 228,800.00 4.4000 M' Rangka daun jendela aluminium 30/70 mm polos 45,000.00 198,000.00 1.1000 M2 Aluminium spandrel 78,000.00 85,800.00 1.1000 M2 Kaca bening 5 mm 80,000.00 88,000.00 1.1000 M2 Kaca es 5 mm 127,500.00 140,250.00 0.2700 Btl Sealant 35,000.00 9,450.00 0.0850 OH Pekerja 30,000.00 2,550.00 2,550.00 0.0850 OH Tukang besi 55,000.00 4,675.00 0.0085 OH Kepala Tukang 60,000.00 510.00 0.0050 OH Mandor 65,000.00 325.00

Daun pintu aluminium kaca bening 326,250.00 8,060.00 334,310.00 Daun pintu aluminium kaca es 378,500.00 8,060.00 386,560.00

Daun pintu aluminium spanreel 324,050.00 8,060.00 332,110.00 Daun jendela kaca bening 295,450.00 8,060.00 303,510.00

Page 29: Rab Puskesmas Tembuku II 15062012

NO. U R A I A N H A R G A

SATUAN BAHAN UPAH JUMLAH E.3 1 M2 MEMASANG ROLLING DOOR ALUMINIUM

1.0000 M2 Rolling door aluminium 325,000.00 325,000.00 1.0000 OH Pekerja 30,000.00 30,000.00 1.0000 OH Tukang Kayu 55,000.00 55,000.00 0.1000 OH Kepala tukang 60,000.00 6,000.00 0.0500 OH Mandor 65,000.00 3,250.00

325,000.00 94,250.00 419,250.00 E.4

1.0000 M2 Pintu lipat besi 825,000.00 825,000.00 0.0440 OH Pekerja 30,000.00 1,320.00 0.0440 OH Tukang Kayu 55,000.00 2,420.00 0.0440 OH Kepala tukang 60,000.00 2,640.00 0.0220 OH Mandor 65,000.00 1,430.00

825,000.00 7,810.00 832,810.00 E.5 1 M3 PEKERJAAN KUSEN PINTU DAN JENDELA, KAYU KELAS I

1.1000 M3 Kayu kamper balok ### ### 1.2500 Kg Paku usuk 15,000.00 18,750.00 1.0000 Kg Lem kayu 10,000.00 10,000.00 7.0000 OH Pekerja 30,000.00 210,000.00 21.0000 OH Tukang Kayu 55,000.00 ### 2.1000 OH Kepala tukang 60,000.00 126,000.00 0.3500 OH Mandor 65,000.00 22,750.00

### ### 9,792,500.00 E.6 1 M3 PEKERJAAN KUSEN PINTU DAN JENDELA, KAYU KELAS II ATAU III

1.1000 M3 Kayu kruing balok ### ### 1.2500 Kg Paku usuk 15,000.00 18,750.00 1.0000 Kg Lem kayu 10,000.00 10,000.00 6.0000 OH Pekerja 30,000.00 180,000.00 18.0000 OH Tukang Kayu 55,000.00 990,000.00 1.8000 OH Kepala tukang 60,000.00 108,000.00 0.3000 OH Mandor 65,000.00 19,500.00

### ### 6,826,250.00 E.7 1 M2 PEKERJAAN DAUN PINTU PANEL, KAYU KELAS I ATAU II

0.0400 M3 Kayu kamper balok ### 300,000.00 0.5000 Kg Lem kayu 10,000.00 5,000.00 1.0000 OH Pekerja 30,000.00 30,000.00 3.0000 OH Tukang Kayu 55,000.00 165,000.00 0.3000 OH Kepala tukang 60,000.00 18,000.00 0.0500 OH Mandor 65,000.00 3,250.00

305,000.00 216,250.00 521,250.00 E.8 1 M2 PEKERJAAN DAUN PINTU & JENDELA KACA, KAYU KELAS I ATAU II

0.0240 M3 Kayu kamper papan ### 196,800.00 0.3000 Kg Lem kayu 10,000.00 3,000.00 0.8000 OH Pekerja 30,000.00 24,000.00 2.4000 OH Tukang Kayu 55,000.00 132,000.00 0.2400 OH Kepala tukang 60,000.00 14,400.00 0.0400 OH Mandor 65,000.00 2,600.00

199,800.00 173,000.00 372,800.00 E.9 1 M2 PEKERJAAN JALUSI KAYU, KAYU KELAS I ATAU II

0.0600 M3 Kayu kamper papan ### 492,000.00 0.1500 Kg Paku reng 15,000.00 2,250.00 0.6700 OH Pekerja 30,000.00 20,100.00 2.0000 OH Tukang Kayu 55,000.00 110,000.00 0.2000 OH Kepala tukang 60,000.00 12,000.00 0.3350 OH Mandor 65,000.00 21,775.00

494,250.00 163,875.00 658,125.00 E.10 1 M2 PASANG DAUN PINTU PLYWOOD RANGKAP, RANGKA TERTUTUP KAYU KELAS I ATAU II

0.0250 M3 Kayu Kamper papan ### 205,000.00 0.0300 Kg Paku reng 15,000.00 450.00 0.5000 Kg Lem kayu 10,000.00 5,000.00 1.0000 Lbr Plywood 4 mm 57,000.00 57,000.00 0.7000 OH Pekerja 30,000.00 21,000.00 2.1000 OH Tukang Kayu 55,000.00 115,500.00 0.2100 OH Kepala tukang 60,000.00 12,600.00 0.0350 OH Mandor 65,000.00 2,275.00

267,450.00 151,375.00 418,825.00

1 M2 MEMASANG PINTU LIPAT (FOLDING DOOR)

Page 30: Rab Puskesmas Tembuku II 15062012

NO. U R A I A N H A R G A

SATUAN BAHAN UPAH JUMLAH E.11 1 M2 PASANG DAUN PINTU PLYWOOD RANGKAP LAPIS ALUMINIUM, RANGKA TERTUTUP KAYU KELAS I ATAU II

0.0250 M3 Kayu Kamper papan ### 205,000.00 0.0300 Kg Paku reng 15,000.00 450.00 0.8000 Kg Lem kayu 10,000.00 8,000.00 1.0000 Lbr Plywood 4 mm 57,000.00 57,000.00 0.5000 Lbr Aluminium jeruk 125,000.00 62,500.00 0.8500 OH Pekerja 30,000.00 25,500.00 2.5500 OH Tukang Kayu 55,000.00 140,250.00 0.2550 OH Kepala tukang 60,000.00 15,300.00 0.0430 OH Mandor 65,000.00 2,795.00

332,950.00 183,845.00 516,795.00

F PEKERJAAN DINDING, PLESTERAN & ACIAN

F.1 1 M2 PASANG BATU BATA CAMP. 1 : 2, TEBAL 1/2 70.0000 Bj Batu bata 1,200.00 84,000.00 18.9500 Kg Semen portland 1,100.00 20,845.00 0.0380 M3 Pasir Pasang 100,000.00 3,800.00 0.3000 OH Pekerja 30,000.00 9,000.00 0.1000 OH Tukang Batu 55,000.00 5,500.00 0.0100 OH Kepala tukang 60,000.00 600.00 0.0150 OH Mandor 65,000.00 975.00

108,645.00 16,075.00 124,720.00 F.2 1 M2 PASANG BATU BATA CAMP. 1 : 5, TEBAL 1/2

70.0000 Bj Batu bata 1,200.00 84,000.00 9.6800 Kg Semen portland 1,100.00 10,648.00 0.0450 M3 Pasir Pasang 100,000.00 4,500.00 0.3000 OH Pekerja 30,000.00 9,000.00 0.1000 OH Tukang Batu 55,000.00 5,500.00 0.0100 OH Kepala tukang 60,000.00 600.00 0.0150 OH Mandor 65,000.00 975.00

99,148.00 16,075.00 115,223.00 F.3 1 M2 PASANG BATAKO CAMP. 1 : 4

12.5000 Bj Batako 1,800.00 22,500.00 12.1300 Kg Semen portland 1,100.00 13,343.00 0.3880 M3 Pasir pasang 100,000.00 38,800.00 0.3000 OH Pekerja 30,000.00 9,000.00 0.1000 OH Tukang Batu 55,000.00 5,500.00 0.0100 OH Kepala tukang 60,000.00 600.00 0.0150 OH Mandor 65,000.00 975.00

74,643.00 16,075.00 90,718.00 F.4 1 M2 PLESTERAN DINDING CAMP. 1 : 2 TEBAL 20 MM

13.6320 Kg Semen portland 1,100.00 14,995.20 0.0270 M3 Pasir pasang 100,000.00 2,700.00 0.4000 OH Pekerja 30,000.00 12,000.00 0.2000 OH Tukang Batu 55,000.00 11,000.00 0.0200 OH Kepala tukang 60,000.00 1,200.00 0.0220 OH Mandor 65,000.00 1,430.00

17,695.20 25,630.00 43,325.20 F.5 1 M2 PLESTERAN DINDING CAMP. 1 : 5 TEBAL 20 MM

6.9120 Kg Semen portland 1,100.00 7,603.20 0.0350 M3 Pasir pasang 100,000.00 3,500.00 0.4000 OH Pekerja 30,000.00 12,000.00 0.2000 OH Tukang Batu 55,000.00 11,000.00 0.0200 OH Kepala tukang 60,000.00 1,200.00 0.0220 OH Mandor 65,000.00 1,430.00

11,103.20 25,630.00 36,733.20 F.6 1 M2 PLESTERAN SIAR CAMP. 1 : 2 PASANGAN BATU KALI

6.3400 Kg Semen portland 1,100.00 6,974.00 0.0120 M3 Pasir pasang 100,000.00 1,200.00 0.3000 OH Pekerja 30,000.00 9,000.00 0.1500 OH Tukang Batu 55,000.00 8,250.00 0.0150 OH Kepala tukang 60,000.00 900.00 0.0150 OH Mandor 65,000.00 975.00

8,174.00 19,125.00 27,299.00 F.7 1 M2 PEKERJAAN ACIAN

3.2500 Kg Semen portland 1,100.00 3,575.00 0.2000 OH Pekerja 30,000.00 6,000.00 0.1000 OH Tukang Batu 55,000.00 5,500.00 0.0100 OH Kepala tukang 60,000.00 600.00 0.0100 OH Mandor 65,000.00 650.00

3,575.00 12,750.00 16,325.00

Page 31: Rab Puskesmas Tembuku II 15062012

NO. U R A I A N H A R G A

SATUAN BAHAN UPAH JUMLAH

G PEKERJAAN ATAP

G.1 1 M2 PASANG ATAP GENTENG BIASA 25.0000 Bj Genteng Biasa, Atap 1,300.00 32,500.00 0.1500 OH Pekerja 30,000.00 4,500.00 0.0750 OH Tukang Kayu 55,000.00 4,125.00 0.0080 OH Kepala tukang 60,000.00 480.00 0.0080 OH Mandor 65,000.00 520.00

32,500.00 9,625.00 42,125.00 G.2 1 M' PASANG BUBUNGAN GENTENG BIASA

5.0000 Lbr Genteng biasa, Bubungan 2,500.00 12,500.00 8.0000 M3 Semen Portland 1,100.00 8,800.00 0.0320 Kg Pasir Pasang 100,000.00 3,200.00 0.4000 OH Pekerja 30,000.00 12,000.00 0.2000 OH Tukang Kayu 55,000.00 11,000.00 0.0200 OH Kepala tukang 60,000.00 1,200.00 0.0020 OH Mandor 65,000.00 130.00

24,500.00 24,330.00 48,830.00 G.1 1 M2 PASANG ATAP GENTENG KODOK KARANG PILANG

21.0000 Bj Genteng Kodok Karang Pilang, Atap 3,800.00 79,800.00 0.1500 OH Pekerja 30,000.00 4,500.00 0.0750 OH Tukang Kayu 55,000.00 4,125.00 0.0080 OH Kepala tukang 60,000.00 480.00 0.0080 OH Mandor 65,000.00 520.00

79,800.00 9,625.00 89,425.00 G.2 1 M' PASANG BUBUNGAN GENTENG KODOK KARANG PILANG

4.0000 Lbr Genteng kodok Karang Pilang, Bubungan 6,000.00 24,000.00 8.0000 M3 Semen Portland 1,100.00 8,800.00 0.0320 Kg Pasir Pasang 100,000.00 3,200.00 0.4000 OH Pekerja 30,000.00 12,000.00 0.2000 OH Tukang Kayu 55,000.00 11,000.00 0.0200 OH Kepala tukang 60,000.00 1,200.00 0.0020 OH Mandor 65,000.00 130.00

36,000.00 24,330.00 60,330.00 G.3 1 M2 PASANG ATAP GENTENG METAL

1.0200 M2 Genteng metal berpasir, atap 95,000.00 96,900.00 10.0000 Bh Paku pancing 1,000.00 10,000.00

0.1000 OH Tukang Kayu 55,000.00 5,500.00 0.0100 OH Kepala tukang 60,000.00 600.00 0.2000 OH Pekerja 30,000.00 6,000.00 0.0010 OH Mandor 65,000.00 65.00

106,900.00 12,165.00 119,065.00 G.4 1 M' PASANG ATAP BUBUNGAN GENTENG METAL

2.5000 Lbr Genteng metal berpasir, bubungan 25,000.00 62,500.00 12.0000 Bh Paku pancing 1,000.00 12,000.00

0.1200 OH Tukang Kayu 55,000.00 6,600.00 0.0100 OH Kepala tukang 60,000.00 600.00 0.0200 OH Pekerja 30,000.00 600.00 0.0020 OH Mandor 65,000.00 130.00

74,500.00 7,930.00 82,430.00 G.5 1 BUAH PASANG MURDA

1.0000 Bh Murda paras 145,000.00 145,000.00 1.0000 Bh Murda fiber 450,000.00 450,000.00 0.1500 Kg Semen portland 1,100.00 165.00 1.0000 Ls Upah kerja langsung 30% x hrg murda 43,500.00 43,500.00

Murda paras 145,165.00 43,500.00 188,665.00 Murda fiber 450,000.00 43,500.00 493,500.00

G.6 1 BUAH PASANG IKUT CELEDU PARAS 1.0000 Bh Ikut celedu paras 85,000.00 85,000.00 1.0000 Bh Ikut celedu fiber 360,000.00 360,000.00 0.1500 Kg Semen portland 1,100.00 165.00 1.0000 Ls Upah kerja langsung 30% x hrg ikut celedu 25,500.00 25,500.00

Ikut celedu paras 85,165.00 25,500.00 110,665.00 Ikut celedu fiber 360,000.00 25,500.00 385,500.00

G.7 1 M' PEKERJAAN LISTPLANK 3/20, KAYU KELAS I ATAU II 0.0108 M3 Kayu kamper papan ### 88,560.00 0.1000 Kg Paku usuk 15,000.00 1,500.00 0.1000 OH Pekerja 30,000.00 3,000.00 0.2000 OH Tukang Kayu 55,000.00 11,000.00 0.0200 OH Kepala tukang 60,000.00 1,200.00 0.0050 OH Mandor 65,000.00 325.00

90,060.00 15,525.00 105,585.00

Page 32: Rab Puskesmas Tembuku II 15062012

NO. U R A I A N H A R G A

SATUAN BAHAN UPAH JUMLAH G.8 1 M' PEKERJAAN LISTPLANK 2 x 3/20 KAYU KAMPER

0.0145 M3 Kayu kamper papan ### 118,900.00 0.0600 Kg Paku usuk 15,000.00 900.00 0.1500 OH Pekerja 30,000.00 4,500.00 0.2500 OH Tukang Kayu 55,000.00 13,750.00 0.0250 OH Kepala tukang 60,000.00 1,500.00 0.0750 OH Mandor 65,000.00 4,875.00

119,800.00 24,625.00 144,425.00 G.9 1 M2 PASANG ALUMINIUM FOIL

1.2000 M3 Aluminium foil 37,500.00 45,000.00 1.0000 Ls Alat bantu 12% x harga bahan 4,500.00 4,500.00 0.1000 OH Pekerja 30,000.00 3,000.00 0.1000 OH Tukang Kayu 55,000.00 5,500.00 0.0100 OH Kepala tukang 60,000.00 600.00 0.0500 OH Mandor 65,000.00 3,250.00

49,500.00 12,350.00 61,850.00

H PEKERJAAN PLAFOND H.1 1 M2 PEKERJAAN PLAFOND GYPSUM + RANGKA METAL FURING

5.0000 Bh Paku Peluru 375.00 1,875.00 1.0000 Pcs Siku Gantung (Angle Clip) 2,000.00 2,000.00 1.0000 Btg Suspension Rod Soft 12,000.00 12,000.00 1.0000 Btg Suspension Rod Clip 10,000.00 10,000.00 0.2500 Btg C Channel Lengkung 52,500.00 13,125.00 0.5000 Btg Metal Furring 44,000.00 22,000.00 1.5000 Pcs Furring Clamp 2,000.00 3,000.00 6.0000 Pcs 250.00 1,500.00 0.4500 Btg Metal Siku 20x20 mm 15,000.00 6,750.00 0.1000 Kg Paku Beton 14,000.00 1,400.00 0.3600 Lbr Gypsum 9 mm 60,000.00 21,600.00 0.3600 Lbr Kalsiboard 4,5 mm 85,000.00 30,600.00 15.0000 Pcs Screw 6x1 350.00 5,250.00 0.0500 Rol Textile Tape 15,000.00 750.00 0.9500 Kg Cornice adhesive 5,200.00 4,940.00 0.0500 Lbr Amplas 2,500.00 125.00 0.1250 OH Pekerja 30,000.00 3,750.00 0.1000 OH Tukang Kayu 55,000.00 5,500.00 0.0200 OH Kepala tukang 60,000.00 1,200.00 0.0050 OH Mandor 65,000.00 325.00

Gypsum 9 mm 106,315.00 10,775.00 117,090.00 Kalsiboard 4,5 mm 115,315.00 10,775.00 126,090.00

H.2 1 M2 PEKERJAAN PLAFOND LAMBRIZIRING + RANGKA KAYU Penutup plafond lambriziring kayu kamper 0.0150 M3 Kayu kamper papan ### 123,000.00 0.0100 Kg Paku reng 15,000.00 150.00 0.8000 OH Pekerja 30,000.00 24,000.00 0.8000 OH Tukang Kayu 55,000.00 44,000.00 0.0800 OH Kepala tukang 60,000.00 4,800.00 0.0400 OH Mandor 65,000.00 2,600.00

Penutup plafond lambriziring kayu kamper 123,150.00 75,400.00 198,550.00 Rangka plafond kayu kruing 60 x 60 cm 0.0163 M3 Kayu kruing usuk ### 78,240.00 0.2500 Kg Paku usuk 15,000.00 3,750.00 0.2000 OH Pekerja 30,000.00 6,000.00 0.3000 OH Tukang Kayu 55,000.00 16,500.00 0.0300 OH Kepala tukang 60,000.00 1,800.00 0.0100 OH Mandor 65,000.00 650.00

Rangka plafond kayu kruing 60 x 60 cm 81,990.00 24,950.00 106,940.00 Jadi plafond lambriziring kayu + rangka kayu 305,490.00

H.3 1 M' PASANG LIST PLAFOND GYPSUM 1.0500 M' Lis plafond gypsum 2/5 cm 2,250.00 2,362.50 1.0500 M' Lis plafond gypsum 5 cm 3,250.00 3,412.50 1.0500 M' Lis plafond gypsum 9 cm 5,750.00 6,037.50 0.1000 Kg Paku sekrup 22,500.00 2,250.00 0.0500 OH Pekerja 30,000.00 1,500.00 0.0500 OH Tukang Kayu 55,000.00 2,750.00 0.0050 OH Kepala tukang 60,000.00 300.00 0.0030 OH Mandor 65,000.00 195.00

Lis plafond gypsum 2/5 cm 4,612.50 4,745.00 9,357.50 Lis plafond gypsum 5 cm 5,662.50 4,745.00 10,407.50 Lis plafond gypsum 9 cm 8,287.50 4,745.00 13,032.50

Screw Ø 3/8

Page 33: Rab Puskesmas Tembuku II 15062012

NO. U R A I A N H A R G A

SATUAN BAHAN UPAH JUMLAH H.4 1 M' PASANG LIST PLAFOND KAYU PROFIL

1.0500 M' Lis plafond kayu profil 2/5 cm 10,500.00 11,025.00 1.0500 M' Lis plafond kayu profil 7 cm 16,250.00 17,062.50 0.0100 Kg Paku lis 18,000.00 180.00 0.0500 OH Pekerja 30,000.00 1,500.00 0.0500 OH Tukang Kayu 55,000.00 2,750.00 0.0050 OH Kepala tukang 60,000.00 300.00 0.0030 OH Mandor 65,000.00 195.00

Lis plafond kayu profil 2/5 cm 11,205.00 4,745.00 15,950.00 Lis plafond kayu profil 7 cm 17,242.50 4,745.00 21,987.50

I PEKERJAAN PENUTUP LANTAI DAN DINDING

I.1 1 M2 PASANG KERAMIK LANTAI 40 x 40 CM 1.0000 M2 Keramik 40/40 polos 51,000.00 51,000.00 1.0000 M2 Keramik 40/40 anti slip 56,100.00 56,100.00 0.0450 M3 Pasir pasang 100,000.00 4,500.00 9.8000 Kg Semen Portland 1,100.00 10,780.00 1.3000 Kg Semen warna 15,000.00 19,500.00 0.7000 OH Pekerja 30,000.00 21,000.00 0.3500 OH Tukang Batu 55,000.00 19,250.00 0.0350 OH Kepala tukang 60,000.00 2,100.00 0.0350 OH Mandor 65,000.00 2,275.00

Keramik 40/40 polos 85,780.00 44,625.00 130,405.00 Keramik 40/40 anti slip 90,880.00 44,625.00 135,505.00

I.2 1 M2 PASANG KERAMIK LANTAI 30 x 30 CM 1.0000 M2 Keramik 30/30 polos 37,000.00 37,000.00 1.0000 M2 Keramik 30/30 anti slip 40,700.00 40,700.00 0.0450 M3 Pasir pasang 100,000.00 4,500.00 10.0000 Kg Semen Portland 1,100.00 11,000.00 1.5000 Kg Semen warna 15,000.00 22,500.00 0.7000 OH Pekerja 30,000.00 21,000.00 0.3500 OH Tukang Batu 55,000.00 19,250.00 0.0350 OH Kepala tukang 60,000.00 2,100.00 0.0350 OH Mandor 65,000.00 2,275.00

Keramik 30/30 polos 75,000.00 44,625.00 119,625.00 Keramik 30/30 anti slip 78,700.00 44,625.00 123,325.00

I.3 1 M2 PASANG KERAMIK LANTAI 20 x 20 CM 1.0000 M2 Keramik 20/20 anti slip 44,000.00 44,000.00 1.0000 M2 Keramik 20/20 polos 40,000.00 40,000.00 0.0450 M3 Pasir pasang 100,000.00 4,500.00 10.4000 Kg Semen Portland 1,100.00 11,440.00 1.6200 Kg Semen warna 15,000.00 24,300.00 0.7000 OH Pekerja 30,000.00 21,000.00 0.3500 OH Tukang Batu 55,000.00 19,250.00 0.0350 OH Kepala tukang 60,000.00 2,100.00 0.0350 OH Mandor 65,000.00 2,275.00

Keramik 20/20 anti slip 84,240.00 44,625.00 128,865.00 Keramik 20/20 polos 80,240.00 44,625.00 124,865.00

I.4 1 M2 PASANG KERAMIK DINDING 20 x 25 CM 1.0000 M2 Keramik 20/25 polos 45,000.00 45,000.00 0.0180 M3 Pasir pasang 100,000.00 1,800.00 9.3000 Kg Semen Portland 1,100.00 10,230.00 1.9400 Kg Semen warna 15,000.00 29,100.00 0.9000 OH Pekerja 30,000.00 27,000.00 0.4500 OH Tukang Batu 55,000.00 24,750.00 0.0450 OH Kepala tukang 60,000.00 2,700.00 0.0450 OH Mandor 65,000.00 2,925.00

86,130.00 57,375.00 143,505.00 I.5 1 M' PASANG LIS KERAMIK DINDING

5.3000 Bh Lis keramik dinding 5/20 3,200.00 16,960.00 5.3000 Bh Lis keramik dinding 7/20 3,900.00 20,670.00 0.5700 Kg Semen portland 1,100.00 627.00 0.0015 M3 Pasir pasang 100,000.00 150.00 0.0130 Kg Semen warna 15,000.00 195.00 0.0900 OH Tukang Batu 55,000.00 4,950.00 0.0900 OH Kepala tukang 60,000.00 5,400.00 0.0090 OH Pekerja 30,000.00 270.00 0.0050 OH Mandor 65,000.00 325.00

Lis keramik dinding 5/20 17,932.00 10,945.00 28,877.00 Lis keramik dinding 7/20 21,642.00 10,945.00 32,587.00

Page 34: Rab Puskesmas Tembuku II 15062012

NO. U R A I A N H A R G A

SATUAN BAHAN UPAH JUMLAH I.6 1 M' PASANG PLINT KERAMIK

2.6500 Bh Plint keramik 10/40 4,200.00 11,130.00 3.5300 Bh Plint keramik 10/30 4,025.00 14,208.25 1.1400 Kg Semen portland 1,100.00 1,254.00 0.0032 M3 Pasir pasang 100,000.00 320.00 0.1000 Kg Semen warna 15,000.00 1,500.00 0.0900 OH Pekerja 30,000.00 2,700.00 2,700.00 0.0900 OH Tukang Batu 55,000.00 4,950.00 4,950.00 0.0090 OH Kepala tukang 60,000.00 540.00 540.00 0.0050 OH Mandor 65,000.00 325.00 325.00

Plint keramik 10/40 14,204.00 8,515.00 22,719.00 Plint keramik 10/30 17,282.25 8,515.00 25,797.25

I.7 1 M' PLINT KAYU KELAS I ATAU II 0.0030 M3 Kayu kamper papan ### 24,600.00 0.0500 Kg Paku sekrup 22,500.00 1,125.00 0.1200 OH Pekerja 30,000.00 3,600.00 0.1200 OH Tukang Batu 55,000.00 6,600.00 0.0120 OH Kepala tukang 60,000.00 720.00 0.0060 OH Mandor 65,000.00 390.00

25,725.00 11,310.00 37,035.00

J PEKERJAAN PENGECATAN

J.1 1 M2 MENGECAT PERMUKAAN TEMBOK BARU (1x PLAMUR, 1x CAT DASAR, 2x CAT PENUTUP) 0.1000 Kg Plamur tembok 13,000.00 1,300.00 0.1000 Kg Cat tembok dasar 21,000.00 2,100.00 0.2600 Kg Cat tembok setara Vinilex 35,000.00 9,100.00 1.0000 Lbr Amplas 2,500.00 2,500.00 0.0200 OH Pekerja 30,000.00 600.00 0.0630 OH Tukang cat 40,000.00 2,520.00 0.0063 OH Kepala tukang 60,000.00 378.00 0.0025 OH Mandor 65,000.00 162.50

15,000.00 3,660.50 18,660.50 J.2 1 M2 MENGECAT PERMUKAAN TEMBOK LAMA

(1x CAT DASAR, 2x CAT PENUTUP) 0.1200 Kg Cat tembok dasar 21,000.00 2,520.00 0.1800 Kg Cat tembok setara Vinilex 35,000.00 6,300.00 0.0280 OH Pekerja 30,000.00 840.00 0.0420 OH Tukang cat 40,000.00 1,680.00 0.0042 OH Kepala tukang 60,000.00 252.00 0.0025 OH Mandor 65,000.00 162.50

8,820.00 2,934.50 11,754.50 J.3 1 M2 MENGECAT PLAFOND

(1x PLAMUR, 1x CAT DASAR, 2x CAT PENUTUP) 0.1000 Kg Plamur tembok 13,000.00 1,300.00 0.1000 Kg Cat tembok dasar 21,000.00 2,100.00 0.2600 Kg Cat tembok setara Vinilex 35,000.00 9,100.00 1.0000 Lbr Amplas 2,500.00 2,500.00 0.0200 OH Pekerja 30,000.00 600.00 0.0630 OH Tukang cat 40,000.00 2,520.00 0.0063 OH Kepala tukang 60,000.00 378.00 0.0025 OH Mandor 65,000.00 162.50

15,600.00 3,060.50 18,660.50 J.4 1 M2 MENGECAT BIDANG KAYU BARU

(1x PLAMUR, 1x CAT DASAR, 2x CAT PENUTUP) 0.2000 Kg Cat Meni 20,000.00 4,000.00 0.1500 Kg Dempul 25,000.00 3,750.00 0.1700 Kg Cat kayu dasar 30,000.00 5,100.00 0.2600 Kg Cat kayu 45,000.00 11,700.00 0.0700 OH Pekerja 30,000.00 2,100.00 2,100.00 0.0090 OH Tukang Cat 40,000.00 360.00 0.0060 OH Kepala tukang 60,000.00 360.00 0.0025 OH Mandor 65,000.00 162.50

26,650.00 2,982.50 29,632.50

Page 35: Rab Puskesmas Tembuku II 15062012

NO. U R A I A N H A R G A

SATUAN BAHAN UPAH JUMLAH J.5 1 M2 MENGECAT BIDANG KAYU LAMA

(1x CAT DASAR, 2x CAT PENUTUP) 0.1700 Kg Cat kayu dasar 30,000.00 5,100.00 0.2600 Lbr Cat kayu 45,000.00 11,700.00 0.0700 OH Pekerja 30,000.00 2,100.00 2,100.00 0.0090 OH Tukang Cat 40,000.00 360.00 0.0060 OH Kepala tukang 60,000.00 360.00 0.0025 OH Mandor 65,000.00 162.50

18,900.00 2,982.50 21,882.50 J.6 1 M2 POLITURAN

0.2500 Ltr Impra 23,500.00 5,875.00 0.2300 Ltr Politur 48,000.00 11,040.00 0.1150 Ltr Clear Gloss 45,000.00 5,175.00 0.2300 Ltr Thinner 25,000.00 5,750.00 0.2500 Lbr Amplas 2,500.00 625.00 0.0100 Bh Kuas 12,000.00 120.00 0.0200 OH Pekerja 30,000.00 600.00 0.0600 OH Tukang cat 40,000.00 2,400.00 0.0160 OH Kepala tukang 60,000.00 960.00 0.0025 OH Mandor 65,000.00 162.50

28,585.00 4,122.50 32,707.50 J.7 1 M2 WATERPROOFING

0.2850 Kg Waterproofing 50,000.00 14,250.00 2.0000 Lbr Amplas 2,500.00 5,000.00 0.0100 Bh Kuas 12,000.00 120.00 0.4720 oh Pekerja 30,000.00 14,160.00 0.2250 oh Tukang Cat 40,000.00 9,000.00 0.0230 oh Kepala Tukang 60,000.00 1,380.00 0.0080 oh Mandor 65,000.00 520.00

42,530.00 1,900.00 44,430.00 J.8 1 M2 COATING PARAS

0.3300 Kg Coating 44,500.00 14,685.00 1.0000 Ls Upah kerja langsung 30% x hrg coating 13,350.00 13,350.00

14,685.00 13,350.00 28,035.00

K PEKERJAAN KACA

K.1 1 M2 PASANG KACA, TEBAL 3 MM 1.1000 M2 Kaca bening 3 mm 86,000.00 94,600.00 1.1000 M2 Kaca es 3 mm 75,000.00 82,500.00 0.0150 OH Pekerja 30,000.00 450.00 0.1500 OH Tukang Kayu 55,000.00 8,250.00 0.0150 OH Kepala tukang 60,000.00 900.00 0.0008 OH Mandor 65,000.00 48.75

94,600.00 9,648.75 104,248.75 82,500.00 9,648.75 92,148.75

K.2 1 M2 PASANG KACA, TEBAL 5 MM 1.1000 M2 Kaca bening 5 mm 80,000.00 88,000.00 1.1000 M2 Kaca es 5 mm 127,500.00 140,250.00 1.1000 M2 Kaca cermin 5 mm 90,000.00 99,000.00 0.0150 OH Pekerja 30,000.00 450.00 0.1500 OH Tukang Kayu 55,000.00 8,250.00 0.0150 OH Kepala tukang 60,000.00 900.00 0.0008 OH Mandor 65,000.00 48.75

Kaca bening 5 mm 88,000.00 9,648.75 97,648.75 Kaca es 5 mm 140,250.00 9,648.75 149,898.75

Kaca cermin 5 mm 99,000.00 9,648.75 108,648.75 K.3 1 M2 PASANG KACA, TEBAL 12 MM

1.1000 M2 Kaca tempered 12 mm ### ### 0.0500 Kg Sealant 35,000.00 1,750.00 0.0250 OH Pekerja 30,000.00 750.00 0.2500 OH Tukang Kayu 55,000.00 13,750.00 0.0250 OH Kepala tukang 60,000.00 1,500.00 0.0013 OH Mandor 65,000.00 81.25

### 16,081.25 1,942,831.25

Page 36: Rab Puskesmas Tembuku II 15062012

NO. U R A I A N H A R G A

SATUAN BAHAN UPAH JUMLAH

L PEKERJAAN PENGUNCI DAN PENGGANTUNG L.1 1 BUAH PASANG HANDLE PINTU

1.0000 Bh Handle pintu steinless steel bulat 162,500.00 162,500.00 1.0000 Bh Handle pintu steinless steel kotak 137,500.00 137,500.00 1.0000 Bh Handle pintu aluminium (comb) 80,000.00 80,000.00 0.0100 OH Pekerja 30,000.00 300.00 0.5000 OH Tukang Kayu 55,000.00 27,500.00 0.0100 OH Kepala tukang 60,000.00 600.00 0.0050 OH Mandor 65,000.00 325.00

Handle pintu steinless steel bulat 162,500.00 28,725.00 191,225.00 Handle pintu steinless steel kotak 137,500.00 28,725.00 166,225.00

Handle pintu aluminium (comb) 80,000.00 28,725.00 108,725.00 L.2 1 BUAH PASANG KUNCI PINTU TANAM

1.0000 Bh Kunci pintu tanam 2x putar 175,000.00 175,000.00 0.0100 OH Pekerja 30,000.00 300.00 0.5000 OH Tukang Kayu 55,000.00 27,500.00 0.0100 OH Kepala tukang 60,000.00 600.00 0.0050 OH Mandor 65,000.00 325.00

175,000.00 28,725.00 203,725.00 L.3 1 BUAH PASANG KUNCI PINTU SELOT

1.0000 Bh Kunci pintu selot 135,000.00 135,000.00 0.0200 OH Pekerja 30,000.00 600.00 0.2000 OH Tukang Kayu 55,000.00 11,000.00 0.0200 OH Kepala tukang 60,000.00 1,200.00 0.0010 OH Mandor 65,000.00 65.00

135,000.00 12,865.00 147,865.00 L.4 1 BUAH PASANG KUNCI PINTU KM/WC

1.0000 Bh Kunci pintu bulat stainless steel 125,000.00 125,000.00 0.0050 OH Pekerja 30,000.00 150.00 0.5000 OH Tukang Kayu 55,000.00 27,500.00 0.0050 OH Kepala tukang 60,000.00 300.00 0.0025 OH Mandor 65,000.00 162.50

125,000.00 28,112.50 153,112.50 L.5 1 BUAH PASANG ENGSEL PINTU

1.0000 Set Engsel Pintu 75,000.00 75,000.00 0.0150 OH Pekerja 30,000.00 450.00 0.1500 OH Tukang Kayu 55,000.00 8,250.00 0.0150 OH Kepala tukang 60,000.00 900.00 0.0008 OH Mandor 65,000.00 48.75

75,000.00 9,648.75 84,648.75 L.6 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU

1.0000 Set Engsel Jendela 65,000.00 65,000.00 0.0100 OH Pekerja 30,000.00 300.00 0.1000 OH Tukang Kayu 55,000.00 5,500.00 0.0100 OH Kepala tukang 60,000.00 600.00 0.0005 OH Mandor 65,000.00 32.50

65,000.00 6,432.50 71,432.50 L.7 1 BUAH PASANG KAIT ANGIN

1.0000 Set Kait Angin 45,000.00 45,000.00 0.0150 OH Pekerja 30,000.00 450.00 0.1500 OH Tukang Kayu 55,000.00 8,250.00 0.0150 OH Kepala tukang 60,000.00 900.00 0.0008 OH Mandor 65,000.00 48.75

45,000.00 9,648.75 54,648.75 L.8 1 BUAH PASANG GRENDEL JENDELA

1.0000 Bh Grendel jendela 57,500.00 57,500.00 0.0150 OH Pekerja 30,000.00 450.00 0.1500 OH Tukang Kayu 55,000.00 8,250.00 0.0150 OH Kepala tukang 60,000.00 900.00 0.0008 OH Mandor 65,000.00 48.75

57,500.00 9,648.75 67,148.75 L.9 1 BUAH PASANG DOOR CLOSER

1.0000 Bh Door Closer 225,000.00 225,000.00 0.0500 OH Pekerja 30,000.00 1,500.00 0.5000 OH Tukang Kayu 55,000.00 27,500.00 0.0500 OH Kepala tukang 60,000.00 3,000.00 0.0025 OH Mandor 65,000.00 162.50

225,000.00 32,162.50 257,162.50

Page 37: Rab Puskesmas Tembuku II 15062012

NO. U R A I A N H A R G A

SATUAN BAHAN UPAH JUMLAH L.10 1 BUAH PASANG ESPAGNOLETH

1.0000 Bh Espagnoleth 125,000.00 125,000.00 0.0150 OH Pekerja 30,000.00 450.00 0.1500 OH Tukang Kayu 55,000.00 8,250.00 0.0150 OH Kepala tukang 60,000.00 900.00 0.0008 OH Mandor 65,000.00 48.75

125,000.00 9,648.75 134,648.75

M PEKERJAAN SANITASI

M.1 1 M' PASANG PIPA PVC TIPE AW Ø ½˝ - Ø 1½˝ 1.2000 M' Pipa PVC Tipe AW Ø ½" 5,000.00 6,000.00 1.0000 Ls Perlengkapan 35% x hrg pipa 1,750.00 1,750.00 1.2000 M' Pipa PVC Tipe AW Ø ¾" 6,250.00 7,500.00 1.0000 Ls Perlengkapan 35% x hrg pipa 2,187.50 2,187.50 1.2000 M' Pipa PVC Tipe AW Ø 1" 7,500.00 9,000.00 1.0000 Ls Perlengkapan 35% x hrg pipa 2,625.00 2,625.00 1.2000 M' Pipa PVC Tipe AW Ø 1½" 17,000.00 20,400.00 1.0000 Ls Perlengkapan 35% x hrg pipa 5,950.00 5,950.00 0.0360 OH Pekerja 30,000.00 1,080.00 0.0600 OH Tukang Batu 55,000.00 3,300.00 0.0060 OH Kepala tukang 60,000.00 360.00 0.0018 OH Mandor 65,000.00 117.00

Pipa PVC Tipe AW Ø ½˝ 7,750.00 4,857.00 12,607.00 Pipa PVC Tipe AW Ø ¾˝ 9,687.50 4,857.00 14,544.50 Pipa PVC Tipe AW Ø 1˝ 11,625.00 4,857.00 16,482.00

Pipa PVC Tipe AW Ø 1½˝ 26,350.00 4,857.00 31,207.00 M.2 1 M' PASANG PIPA PVC TIPE AW Ø 2˝ - Ø 2½˝

1.2000 M' Pipa PVC Tipe AW Ø 2" 18,750.00 22,500.00 1.0000 Ls Perlengkapan 35% x hrg pipa 6,562.50 6,562.50 1.2000 M' Pipa PVC Tipe AW Ø 2½" 25,000.00 30,000.00 1.0000 Ls Perlengkapan 35% x hrg pipa 8,750.00 8,750.00 0.0540 OH Pekerja 30,000.00 1,620.00 0.0900 OH Tukang Batu 55,000.00 4,950.00 0.0090 OH Kepala tukang 60,000.00 540.00 0.0027 OH Mandor 65,000.00 175.50

Pipa PVC Tipe AW Ø 2˝ 29,062.50 7,285.50 36,348.00 Pipa PVC Tipe AW Ø 2½˝ 38,750.00 7,285.50 46,035.50

M.3 1 M' PASANG PIPA PVC TIPE AW Ø 3˝ - Ø 4˝ 1.2000 M' Pipa PVC Tipe AW Ø 3" 33,250.00 39,900.00 1.0000 Ls Perlengkapan 35% x hrg pipa 11,637.50 11,637.50 1.2000 M' Pipa PVC Tipe AW Ø 4" 53,125.00 63,750.00 1.0000 Ls Perlengkapan 35% x hrg pipa 18,593.75 18,593.75 0.0810 OH Pekerja 30,000.00 2,430.00 0.1350 OH Tukang Batu 55,000.00 7,425.00 0.0135 OH Kepala tukang 60,000.00 810.00 0.0041 OH Mandor 65,000.00 266.50

Pipa PVC Tipe AW Ø 3˝ 51,537.50 10,931.50 62,469.00 Pipa PVC Tipe AW Ø 4˝ 82,343.75 10,931.50 93,275.25

M.4 1 BUAH PASANG KLOSET DUDUK 1.0000 Bh Kloset duduk ### ### 1.0000 Set Perlengkapan 6% x hrg kloset 87,000.00 87,000.00 3.3000 OH Pekerja 30,000.00 99,000.00 1.1000 OH Tukang Batu 55,000.00 60,500.00 0.0010 OH Kepala tukang 60,000.00 60.00 0.1600 OH Mandor 65,000.00 10,400.00

### 169,960.00 1,706,960.00 M.5 1 BUAH PASANG KLOSET JONGKOK

1.0000 Bh Kloset jongkok 235,000.00 235,000.00 6.0000 Kg Semen Portland 1,100.00 1,100.00 0.0100 M3 Pasir Pasang 100,000.00 100,000.00 1.0000 OH Pekerja 30,000.00 30,000.00 1.5000 OH Tukang Batu 55,000.00 82,500.00 1.5000 OH Kepala tukang 60,000.00 90,000.00 0.1600 OH Mandor 65,000.00 10,400.00

336,100.00 212,900.00 549,000.00

Page 38: Rab Puskesmas Tembuku II 15062012

NO. U R A I A N H A R G A

SATUAN BAHAN UPAH JUMLAH M.6 1 BUAH PASANG WASTAFEL

1.0000 Bh Wastafel 350,000.00 350,000.00 1.0000 Set Perlengkapan 12% x hrg wastafel 42,000.00 42,000.00 1.2000 OH Pekerja 30,000.00 36,000.00 1.4500 OH Tukang Batu 55,000.00 79,750.00 0.1500 OH Kepala tukang 60,000.00 9,000.00 0.1000 OH Mandor 65,000.00 6,500.00

392,000.00 131,250.00 523,250.00 M.7 1 BUAH PASANG SHOWER

1.0000 Bh Shower 235,000.00 235,000.00 1.0000 Set Perlengkapan 12% x hrg shower 28,200.00 28,200.00 1.2000 OH Pekerja 30,000.00 36,000.00 1.4500 OH Tukang Batu 55,000.00 79,750.00 0.1500 OH Kepala tukang 60,000.00 9,000.00 0.1000 OH Mandor 65,000.00 6,500.00

263,200.00 131,250.00 394,450.00 M.8 1 BUAH PASANG BAK CUCI STAINLESS STEEL

1.0000 Bh Bak cuci steinless steel 375,000.00 375,000.00 1.0000 Set Water Drain + Asesoris 30% x hrg bak 112,500.00 112,500.00 0.0300 OH Pekerja 30,000.00 900.00 0.3000 OH Tukang batu 55,000.00 16,500.00 0.0300 OH Kepala tukang 60,000.00 1,800.00 0.0015 OH Mandor 65,000.00 97.50

487,500.00 19,297.50 506,797.50 M.9 1 BUAH PASANG URINOIR

1.0000 Bh Urinoir 625,000.00 625,000.00 1.0000 Set Perlengkapan 30% x hrg urinoir 187,500.00 187,500.00 6.0000 Kg Semen Portland 1,100.00 6,600.00 0.0100 M3 Pasir Pasang 100,000.00 1,000.00 1.0000 OH Pekerja 30,000.00 30,000.00 1.0000 OH Tukang Batu 55,000.00 55,000.00 0.1000 OH Kepala tukang 60,000.00 6,000.00 0.1000 OH Mandor 65,000.00 6,500.00

820,100.00 97,500.00 917,600.00 M.10 1 BUAH PASANG KRAN AIR

1.0000 Bh Kran air biasa 1/2" 90,000.00 90,000.00 1.0000 Bh Kran air wastafel 165,000.00 165,000.00 1.0000 Bh Kran air leher angsa 180,000.00 180,000.00 1.0000 Bh Jet washer 185,000.00 185,000.00 0.0250 Bh Seal Tape 2,000.00 50.00 0.0100 OH Pekerja 30,000.00 300.00 0.1000 OH Tukang Batu 55,000.00 5,500.00 0.0100 OH Kepala tukang 60,000.00 600.00 0.0050 OH Mandor 65,000.00 325.00

Kran air biasa 1/2" 90,050.00 6,725.00 96,775.00 Kran air wastafel 255,000.00 6,725.00 261,725.00

Kran air leher angsa 270,000.00 6,725.00 276,725.00 Jet washer 185,050.00 6,725.00 191,775.00

M.11 1 BUAH PASANG FLOOR DRAIN 1.0000 Bh Floor Drain 190,000.00 190,000.00 0.0100 OH Pekerja 30,000.00 300.00 0.1000 OH Tukang Batu 55,000.00 5,500.00 0.0100 OH Kepala tukang 60,000.00 600.00 0.0050 OH Mandor 65,000.00 325.00

190,000.00 6,725.00 196,725.00 M.12 1 BUAH PASANG TEMPAT SABUN

1.0000 Bh Tempat sabun 120,000.00 120,000.00 0.0100 OH Pekerja 30,000.00 300.00 0.1000 OH Tukang Batu 55,000.00 5,500.00 0.0100 OH Kepala tukang 60,000.00 600.00 0.0050 OH Mandor 65,000.00 325.00

120,000.00 6,725.00 126,725.00

Page 39: Rab Puskesmas Tembuku II 15062012

NO. U R A I A N H A R G A

SATUAN BAHAN UPAH JUMLAH

N PEKERJAAN MEKANIKAL DAN ELEKTRIKAL N.1 1 TITIK INSTALASI LAMPU, STOP KONTAK, EXHAUST

10.0000 M' NYM 3 x 2,5 mm Ex. Supreme 14,000.00 140,000.00 3.0000 Btg Pipa conduit 5/8" 9,500.00 28,500.00 2.0000 Bh Tee duss 5,000.00 10,000.00 15.0000 Bj Klem 700.00 10,500.00 3.0000 Bj Shock 750.00 2,250.00 1.0000 Bj Imbowduss 4,500.00 4,500.00 1.0000 ttk Biaya pasang 30,000.00 30,000.00

195,750.00 30,000.00 225,750.00 N.2 1 BUAH PASANG SAKLAR, STOP KONTAK, OUTLET

1.0000 Bh Saklar tunggal setara Clipsall 40,000.00 40,000.00 1.0000 Bh Saklar ganda setara Clipsall 50,500.00 50,500.00 1.0000 Bh Stop kontak setara Clipsall 55,000.00 55,000.00 1.0000 Bh Stop kontak AC setara Clipsall 78,000.00 78,000.00 1.0000 Bh Outlet TV setara Clipsall 175,000.00 175,000.00 1.0000 Bh Outlet telepon setara Clipsall 175,000.00 175,000.00 1.0000 Ls Biaya pasang 20,000.00 20,000.00

Saklar tunggal setara Clipsall 40,000.00 20,000.00 60,000.00 Saklar ganda setara Clipsall 50,500.00 20,000.00 70,500.00 Stop kontak setara Clipsall 55,000.00 20,000.00 75,000.00

Stop kontak AC setara Clipsall 78,000.00 20,000.00 98,000.00 Outlet TV setara Clipsall 175,000.00 20,000.00 195,000.00

Outlet telepon setara Clipsall 175,000.00 20,000.00 195,000.00 N.3 1 BUAH PASANG LAMPU

1.0000 Bh Lampu SL 23 Watt setara Philips 45,000.00 45,000.00 1.0000 Bh Lampu SL 11 Watt setara Philips 37,500.00 37,500.00 1.0000 Bh Lampu RMI 2 x 36 Watt setara Philips 450,000.00 450,000.00 1.0000 Bh Lampu RMI 2 x 18 Watt setara Philips 385,000.00 385,000.00 1.0000 Ls Biaya pasang 15,000.00 15,000.00

Lampu SL 23 Watt setara Philips 45,000.00 15,000.00 60,000.00 Lampu SL 11 Watt setara Philips 37,500.00 15,000.00 52,500.00

Lampu RMI 2 x 36 Watt setara Philips 450,000.00 15,000.00 465,000.00 Lampu RMI 2 x 18 Watt setara Philips 385,000.00 15,000.00 400,000.00

N.4 1 BUAH PASANG EXHAUST 1.0000 Bh Kipas angin ceiling fan 435,000.00 435,000.00 1.0000 Bh Kipas angin wall fan 275,000.00 275,000.00 1.0000 Bh Exhaust fan 12" setara Panasonic 400,000.00 400,000.00 1.0000 Bh Exhaust ceiling 8" setara Panasonic 310,000.00 310,000.00 1.0000 Ls Biaya pasang 35,000.00 35,000.00

Kipas angin ceiling fan 435,000.00 35,000.00 470,000.00 Kipas angin wall fan 275,000.00 35,000.00 310,000.00

Exhaust fan 12" setara Panasonic 400,000.00 35,000.00 435,000.00 Exhaust ceiling 8" setara Panasonic 310,000.00 35,000.00 345,000.00

O PEKERJAAN STYLE BALI O.1 1 M2 PASANG TEMPELAN PARAS SARWAGENEP

18.7500 Bj Paras Sarwagenep 12,500.00 234,375.00 18.7500 Bj Batu Palimanan 11,000.00 206,250.00 20.0000 Kg Semen Portland 1,100.00 22,000.00 0.0420 M3 Pasir pasang 100,000.00 4,200.00 0.3000 OH Tukang Style Bali 70,000.00 21,000.00 0.3500 OH Kepala Tukang Style Bali 90,000.00 31,500.00 1.7500 OH Pekerja 30,000.00 52,500.00 0.1000 OH Mandor 65,000.00 6,500.00

Paras Sarwagenep 260,575.00 111,500.00 372,075.00 Batu Palimanan 232,450.00 111,500.00 343,950.00

P PEKERJAAN LANDSCAPE

P.1 1 M2 PASANG KORAL SIKAT BERMOTIP 3.0000 Zak Koral sikat 27,500.00 82,500.00 15.7500 Kg Semen portland 1,100.00 17,325.00 0.0230 M3 Pasir pasang 100,000.00 2,300.00 0.7500 OH Tukang batu 55,000.00 41,250.00 0.0950 OH Kepala tukang 60,000.00 5,700.00 0.6250 OH Pekerja 30,000.00 18,750.00 0.0620 OH Mandor 65,000.00 4,030.00

102,125.00 69,730.00 171,855.00

Page 40: Rab Puskesmas Tembuku II 15062012

NO. U R A I A N H A R G A

SATUAN BAHAN UPAH JUMLAH P.2 1 M' PASANG KANSTEEN

2.0000 Bh Kansteen beton 15x20x50 (segi lima) 21,500.00 43,000.00 1.5000 Kg Semen portland 1,100.00 1,650.00 0.0300 M3 Pasir Pasang 100,000.00 3,000.00 0.0200 M3 Pasir urug 63,000.00 1,260.00 1.0000 Ls Upah Kerja 30% 14,673.00 14,673.00

48,910.00 14,673.00 63,583.00 P.3 1 M2 PASANG PAVING BLOCK

1.0000 M2 Paving block 20x20 tebal 6 cm K-175 58,450.00 58,450.00 1.0000 M2 Paving block 20x20 tebal 6 cm K-225 61,300.00 61,300.00 1.0000 M2 Paving block 20x20 tebal 8 cm K-175 67,950.00 67,950.00 1.0000 M2 Paving block 20x20 tebal 8 cm K-225 70,800.00 70,800.00 0.3100 OH Tukang Batu 55,000.00 17,050.00 0.0310 OH Kepala tukang 60,000.00 1,860.00 0.6300 OH Pekerja 30,000.00 18,900.00 0.0310 OH Mandor 65,000.00 2,015.00

Paving block 20x20 tebal 6 cm K-175 58,450.00 39,825.00 98,275.00 Paving block 20x20 tebal 6 cm K-225 61,300.00 39,825.00 101,125.00 Paving block 20x20 tebal 8 cm K-175 67,950.00 39,825.00 107,775.00 Paving block 20x20 tebal 8 cm K-225 70,800.00 39,825.00 110,625.00

Page 41: Rab Puskesmas Tembuku II 15062012

RENCANA ANGGARAN BIAYA(RAB)

KEGIATAN : PENINGKATAN PUSKESMAS MENJADI PUSKESMAS RAWAT INAPPEKERJAAN : REHABILITASI PUSKESMAS TEMBUKU IILOKASI : DESA METRO, KECAMATAN TEMBUKU, KAB. BANGLITAHUN ANGGARAN : 2012

NO. URAIAN PEKERJAAN VOL. SAT.

A PEKERJAAN PERSIAPAN 1 Pas. Papan bouwplank 89.97 m' 44,170 2 Air kerja dan listrik 1.00 ls 5,000,000

JUMLAH A B PEKERJAAN PEMBONGKARAN

1 Pek. Pembongkaran genteng atap 794.83 M2 2 Pek. Pembongkaran kap atap + lisplank kayu 794.83 M2 3 Pek. Pembongkaran plafond 643.81 M2 4 Pek. Pembongkaran dinding batu bata 596.84 M2 5 Pek. Pembongkaran lantai 643.81 M2 6 Pek. Pembongkaran beton bertulang 14.50 M3 7 Pek. Pembongkaran box tanaman 14.37 M2

JUMLAH B C PEKERJAAN TANAH DAN PASIR

1 Pek. Galian tanah pondasi menerus 185.40 m3 24,125 2 Pek. Urugan kembali pondasi menerus 290.19 m3 7,237 3 Pek. Urugan tanah peninggian lantai 122.71 m3 159,125 4 Pek. Urugan pasir bawah pondasi menerus 12.09 m3 84,725 5 Pek. Urugan pasir bawah lantai 20.45 m3 84,725

JUMLAH C D PEKERJAAN PONDASI

1 Pas. Batu kosong 46.35 m3 250,941 2 Pek. Pondasi batu kali 1 : 5 94.71 m3 473,625

JUMLAH D E PEKERJAAN BETON

1 Pek. Kolom praktis 190.40 m' 55,045 2 Pek. Sloof praktis 209.52 m' 65,050 3 Pek. Plat dak fe. 120 15.11 m3 4,689,001 4 Pek. Meja beton fe. 100 0.22 m3 4,689,001 5 Pek. Beton ring balok praktis 237.92 m' 65,050 6 Pek. Beton rabat bawah lantai 409.02 m2 134,395 7 Pek. Kursi Beton fe. 100 1.15 m3 4,469,341

JUMLAH E F PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pek. Kusen pintu dan Jendela aluminium 3" 347.81 m' 2 Pek. Daun pintu aluminium + Kaca 5 mm 30.24 m' 3 Pek. Pintu Geser Kalsiboard + rangka aluminium 2.21 m2 4 Pek. Daun pintu aluminium 11.13 unit 5 Pek. Daun jendela kaca 36.58 m2 6 Pek. Kaca mati 5 mm 1.23 m2 7 Pek. Pintu Lipat krepyak kayu 4.95 m2 8 Pek. Kusen kayu 5x12 0.04 m3

Aksesori : 1 Handle Pintu 19.00 bh 2 Kunci Pintu 19.00 bh 3 Door Closer 14.00 bh 4 Rel Pintu Geser 1.00 bh 5 Engsel Pintu 74.00 bh 6 Engsel Jendela 204.00 bh 7 Lamskar 117.00 bh 8 Grendel Pintu 8.00 bh 9 Grendel Jendela 105.00 bh 10 Espagnolet 6.00 bh

JUMLAH F G PEKERJAAN PASANGAN, PLESTERAN DAN ACIAN

1 Pas. Dinding 1/2 bata 1 : 5 879.37 m2 115,223 2 Pek. Plesteran tembok 1 : 2 98.18 m2 43,325

HARGA SATUAN

(Rp)

Page 42: Rab Puskesmas Tembuku II 15062012

NO. URAIAN PEKERJAAN VOL. SAT. HARGA

SATUAN (Rp)

3 Pek. Plesteran tembok 1 : 5 1,660.55 m2 36,733 4 Pek. Acian 1,758.73 m2 16,325 5 Pek. Dinding Partisi Kalsiboard rangka aluminium 26.72 m2 550,000

JUMLAH G H PEKERJAAN ATAP

1 Pek. Kuda-kuda baja ringan profil C + talang air + aksesoris 431.74 m2 250,000 2 Pas. Penutup atap genteng plentong 431.74 m3 8,721,300 3 Pas. Bubungan genteng plentong 53.78 m2 96,000 4 Pas. Murda paras 53.78 m2 147,220 5 Pas. Ikut celedu paras 2.00 m' 224,190 6 Pas. Aluminium foil 4.00 m' 43,330 7 Pek. Lislpank kayu kamper 2 x 2/20 cm 431.74 m' 70,752

JUMLAH H I PEKERJAAN PLAFOND

1 Pas. Penutup plafond gypsum 9 mm + rangka metal furing 214.15 m2 117,090 2 Pas. Penutup plafond kalsiboard 4.5 mm + rangka metal furing 154.17 m2 162,725 3 Pas. List plafond gypsum 9 cm 180.96 m2 70,800 4 Pas. List plafond gypsum 4 cm 302.40 m' 13,033

JUMLAH I J PEKERJAAN PENUTUP LANTAI DAN DINDING

1 Pas. Keramik lantai 40 x 40 cm polos (A) 234.25 m2 130,405 2 Pas. Keramik lantai 40 x 40 cm anti slip (B) 96.41 m2 22,719 3 Pas. Keramik lantai 20 x 20 cm untuk KM/WC ( C ) 13.04 m2 135,505 4 Pas. Plint keramik lantai 10 x 40 cm 228.62 m1 128,865 5 Pas. Keramik dinding 25 x 20 cm 242.69 m2 124,865 6 Pas. Keramik dinding 25 x 20 cm untuk KM/WC 38.54 m2 22,719 7 Pas. Border keramik dinding 10 x 20 cm 161.79 m1 370,000 8 Pas. Kaca cermin tebal 3 mm 1.75 m2 98,553

JUMLAH J K PEKERJAAN PENGECATAN

1 Pek. Pengecatan tembok interior setara Vinilex 910.77 m2 18,661 2 Pek. Pengecatan tembok exterior setara Propan 179.00 m2 18,661 3 Pek. Pengecatan plafond + lis gypsum setara Vinilex 214.15 m2 32,708 4 Pek. Polituran listplank kayu + tatab 36.19 m2 32,708 5 Pek. Waterproofing 47.95 m2 44,430

JUMLAH K L PEKERJAAN PLUMBING

1 Pas. Stop kran 3/4 " setara Kits 1.00 bh 65,000 2 Pek. Clean Out 4.00 bh 150,000 3 Pas. Kloset duduk + aksesoris setara Toto 3.00 bh 1,706,960 4 Pas. Wastafel + aksesoris setara Toto 5.00 bh 506,798 5 Pas. Floor drain setara Toto 3.00 bh 196,725 6 Pas. Shower + aksesoris setara Toto 3.00 bh 506,798 7 Pas. Bak cuci stainless steel setara Royal 2.00 bh 276,725 8 Pas. Kran air leher angsa setar Toto 2.00 bh 261,725 9 Pas. Kran air untuk wastafel setara Toto 5.00 bh 96,775 10 Pas. Kran air biasa setara Toto - bh 126,725 11 Pas. Tempat sabun setara Toto 3.00 unit 22,411,151 12 Pek. Grease Trap - unit 750,000 13 Pek. Septicktank + peresapan 1.00 unit 7,336,765

JUMLAH L M PEKERJAAN MEKANIKAL DAN ELEKTRIKAL

1 PEKERJAAN PANELPengadaan Dan Pemasangan Panel Lengkap Dengan TerminasiGrounding, Dan Alat Bantu lainya

PP.RAWAT INAP 1 Unit 5,175,000

2 KABEL POWER TEGANGAN RENDAH

NYY 4 x 4 mm2 dari MDP ke PP. Rawat Inap (Proposional ) 30 m 44,900

3 INSTALASI ELEKTRIKALInstalasi Titik Lampu dan stop kontak, ( Kabel NYM 3 x 2,5 mm2 )dalam pipa Conduit PVC High Impact diameter 20 mm

Page 43: Rab Puskesmas Tembuku II 15062012

NO. URAIAN PEKERJAAN VOL. SAT. HARGA

SATUAN (Rp)

Material / Peralatan UtamaLampu DL 5" + PLS 18 Watt 37 Bh 132,300.00Lampu TL 2x18 Recessed & Cover 39 Bh 350,800.00Lampu TL 1x18 Balk 6 Bh 143,800.00Lampu Dinding 25 W 2 Bh 175,000.00Ceiling fan 11 Bh 650,000.00Stop kontak 1 Ph, 13 A 100 Watt 43 Bh 36,800.00Stop kontak AC dan water heater 2 Bh 107,300.00Saklar Engkel 7 Bh 26,700.00Saklar Seri 13 Bh 54,100.00

Pengadaan Dan Pemasangn Kabel Instalasi Instalasi kabel lampu (NYM 3x2,5 mm2 + HIC 20 mm) 84 Titik 195,500.00Instalasi kabel saklar (NYM 3x2,5 mm2 + HIC 20 mm) 20 Titik 120,800.00Instalasi kabel stop kontak (NYM 3x2,5 mm2 + HIC 20 mm) 43 Titik 218,800.00Instalasi kabel stop kontak AC (NYM 3x2,5 mm2 + HIC 20 mm) 1 Titik 270,000.00Instalasi kabel Water heater (NYM 3x2,5 mm2 + HIC 20 mm) 1 Titik 270,000.00Instalasi kabel Exhaust fan (NYM 3x2,5 mm2 + HIC 20 mm) 4 Titik 120,800.00Instalasi kabel Ceiling fan (NYM 3x2,5 mm2 + HIC 20 mm) 11 Titik 243,300.00

4 PEKERJAAN TELEPON DAN TVPengadaan, Pemasangan dan Pengetesan Peralatan TelephoneSesuai Gambar Dan Spesifikasi

EDP ( Elektronik Distribusi Panel ) 1 unit 690,000.00Telephone Outlet 4 Bh 114,600.00TV Outlet 3 Bh 69,000.00Instalasi Telephone (ITC 2 x 2 x 0,6 mm + PVC Conduit ) 4 Ttk 189,800.00Instalasi MATV (Coaxial RG 6 + PVC Conduit ) 3 Ttk 184,000.00Instalasi Telephone (ITC 10 x 2 x 0,6 mm + PVC Conduit ) 20 m 27,600.00Instalasi kabel TV Coaxial RG 11 + PVC conduit 15 m 17,300.00

5 PEKERJAAN INSTALASI PLAMBINGPengadaan, Pemasangan dan Pengetesan Instalasi Pemipaan

EQUIPMENT

. 1 UnitPump Room 1 Unit

Pompa Distribusi 1 Unit 8,625,000.00Capasity : 60 L/MHead : 40 MDaya : 0,5 Kw / 220 V / 50 Hz

Electric Water Heater 1 Unit 4,600,000.00Capasity : 80 L/MDaya : 800 W / 220 V / 50 Hz

Pompa Submersibel 1 Unit 2,760,000.00Capasity : 50 L/MHead : 10 M

Instalasi Pipa Air Bekas & Kotor dari bahan PVC klas AWTermasuk Support, & Alat Bantu Lainya Sesuai Gambar Dan Spesifikasi.

Instalasi :Pipa dia. 4" 77 m' 89,700.00Pipa dia. 3" 154 m' 64,600.00Pipa dia. 2" 29 m' 39,100.00Pipa dia. 1 1/4" (Vent) 12 m' 23,500.00Clean out dia. 100 mm "PVC" 2 Bh 40,300.00Clean out dia. 80 mm "PVC" 4 Bh 33,400.00Floor drain "Toto" 3 Bh 362,300.00P -Trap 3 Bh 51,800.00

Ground tank kap. 4 m3 ( By Sipil )

Page 44: Rab Puskesmas Tembuku II 15062012

NO. URAIAN PEKERJAAN VOL. SAT. HARGA

SATUAN (Rp)

Fitting 1 Ls 4,198,800.00Vent Cup 32 mm 2 Bh 26,500.00Bak Kontrol 1 unit 517,500.00Peresapan 1 unit 2,012,500.00Septictank 1 unit 8,625,000.00Galian dan urugan 200 unit 17,300.00

Instalasi Pipa Air Dingin PVC Class AW Sesuai Gambar & Spesifikasi

Instalasi :Pipa diameter 1/2" 34 m 14,500.00Pipa diameter 1" 50 m 18,200.00Pipa diameter 1 1/4" 128 m 23,500.00Pipa diameter 1 1/2" 20 m 27,800.00Fitting 1 Ls 1,142,400.00Kran Air dia. 1/2" 2 Bh 34,500.00Ball Valve Diameter 1/2" PVC 4 Bh 28,800.00Ball Valve Diameter 1" PVC 4 Bh 34,500.00Ball Valve Diameter 11/4" PVC 2 Bh 39,200.00Ball Valve Diameter 11/2" PVC 3 Bh 51,800.00Floating Valve Diameter 1" 1 Bh 644,000.00Foot Valve Diameter 11/4" 1 Bh 247,300.00Galian tanah u/ pasang pipa 130 m' 17,300.00

Instalasi Pipa Air Panas PPR-PN20 Sesuai Gambar & Spesifikasi

Instalasi :Pipa diameter 1/2" 10 m 32,700.00Pipa diameter 3/4" 6 m 44,900.00Fitting 1 Ls 205,800.00Ball Valve Diameter 3/4" KITz 2 Bh 132,500.00Check Valve Diameter 3/4" KITz 1 Bh 94,000.00

Instalasi Pipa Air Hujan dari bahan PVC klas DTermasuk Support, & Alat Bantu Lainya Sesuai Gambar Dan Spesifikasi.

Pipa dia. 3" 78 m' 32,100.00Pipa dia. 4" 50 m' 45,500.00Pipa dia. 6" 78 m' 81,800.00Pipa dia. 8" 6 m' 131,800.00Fitting 1 Ls 3,435,600.00Roof drain dia. 4" 8 Bh 270,300.00Roof drain dia. 3" 6 Bh 270,300.00Bok kontrol 7 m' 450,000.00Galian tanah u/ pasang pipa 76 m' 17,300.00Material bantu, Support dan hanger 1 Lot 1,725,000.00

6 PEKERJAAN TATA UDARA

Pengadaan, Pemasangan dan Pengetesan Peralatan Tata udaratermasuk instalasi kabel, pipa refrigerant, pipa drain dan pipa exhaustsesuai dengan gambar dan spesifikasi.

In/outdoor UnitType : Wall mountedcooling capacity : 7.000 Btu/h 1 Unit 2,875,000.00

Exhaust fanType : Forward fan ceiling 4 Unit 395,600.00Cap. : 80 CfmPower : 220 V / 1 Ph / 50 Hz

Instalasi Pipa AC : (dg tebal isolasi 19 mm)Pipa Refrigerant dia. 1/4" dengan isolasi 6 m' 29,400.00Pipa Refrigerant dia. 3/8" dengan isolasi 6 m' 36,800.00Pipa Drain PVC klas AW dia. 20 mm dengan isolasi 4 m' 15,800.00

Page 45: Rab Puskesmas Tembuku II 15062012

NO. URAIAN PEKERJAAN VOL. SAT. HARGA

SATUAN (Rp)

Kabel power NYM 3x2,5 mm2 dari indoor ke outdoor 6 m' 17,300.00Pipa Exhaust PVC klas D pipe dia. 4" 4 m' 51,300.00

JUMLAH M N PEKERJAAN STYLE BALI

1 Tempelan paras sarwa genep pd kolom 15.60 m2 750,000 2 Tempelan batu candi pada kolom 0.54 m2 436,005 3 Tempelan paras sarwa genep keliling tembok 47.95 m2 4 Tempelan batu candi keliling tembok 19.98 m2 5 Tempelan batu candi pada kursi beton 2.57 m2

JUMLAH N O PEKERJAAN PENATAAN HALAMAN

1 Pas. Tanaman hias 2.78 m2 2,500 2 Pek. Box tanaman fin. Batu Candi 7.39 m2 84,725 3 Pek. Pagar beton cetak 18.00 m1 110,625 4 Pas. Railing stainless steel 2" untuk ramp 21.08 m'

JUMLAH O

Page 46: Rab Puskesmas Tembuku II 15062012

NO. URAIAN PEKERJAAN VOL. SAT.

A PEKERJAAN PERSIAPAN

1 Pas. Papan bouwplank 89.97 m'

2 Air kerja dan listrik 1.00 ls

B PEKERJAAN PEMBONGKARAN

1 Pek. Pembongkaran genteng atap 794.83 m2

2 Pek. Pembongkaran kap atap + lisplank kayu 794.83 m2

3 Pek. Pembongkaran plafond 643.81 m2

4 Pek. Pembongkaran dinding batu bata 596.84 m2

5 Pek. Pembongkaran lantai 643.81 m2

6 Pek. Pembongkaran beton bertulang 14.50 m3

sloof 15/20 5.43

kolom 15/15 3.65

ringbalok 15/20 5.43

7 Pek. Pembongkaran box tanaman 14.37 m2

C PEKERJAAN TANAH DAN PASIR

1 Pek. Galian tanah pondasi menerus 185.40 m3

2 Pek. Urugan kembali pondasi menerus 290.19 m3

3 Pek. Urugan tanah peninggian lantai 122.71 m3

4 Pek. Urugan pasir bawah pondasi menerus 12.09 m3

5 Pek. Urugan pasir bawah lantai 20.45 m3

D PEKERJAAN PONDASI

1 Pas. Batu kosong 46.35 m3

2 Pek. Pondasi batu kali 1 : 5 94.71 m3

E PEKERJAAN BETON

1 Pek. Beton kolom praktis 190.40 m'

2 Pek. Beton sloof praktis 209.52 m'

3 Pek. Beton plat dak 15.11 m3

plat dak kanopi 15.11

plat dak jembatan 1.53

4 Pek. Meja beton fe. 100 0.22 m3

5 Pek. Beton ring balok 237.92 m'

6 Pek. Beton rabat bawah lantai 409.02 m2

7 Pek. Kursi Beton 1.15 m3

F PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pek. Kusen pintu dan Jendela aluminium 3" 347.81 m'

2 Pek. Daun pintu aluminium + Kaca 5 mm 30.24 m2

3 Pek. Pintu Geser Kalsiboard + rangka aluminium 2.21 m2

4 Pek. Daun pintu aluminium 11.13 m2

5 Pek. Daun jendela kaca 36.58 m2

6 Pek. Kaca mati 5 mm 1.23 m2

Page 47: Rab Puskesmas Tembuku II 15062012

7 Pek. Pintu Lipat krepyak kayu 4.95 m2

8 Pek. Kusen kayu 5x12 0.04 m3

Aksesori :

1 Handle Pintu 19.00 unit

2 Kunci Pintu 19.00 unit

3 Door Closer 14.00 unit

4 Rel Pintu Geser 1.00 unit

5 Engsel Pintu 74.00 unit

6 Engsel Jendela 204.00 unit

7 Lamskar 117.00 unit

8 Grendel Pintu 8.00 unit

9 Grendel Jendela 105.00 unit

10 Espagnolet 6.00 unit

G PEKERJAAN PASANGAN, PLESTERAN DAN ACIAN

1 Pas. Dinding 1/2 bata 1 : 5 879.37 m2

luasan kusen P1 79.18

2 Pek. Plesteran tembok 1 : 2 98.18 m2

3 Pek. Plesteran tembok 1 : 5 1,660.55 m2

4 Pek. Acian 1,758.73 m2

5 Pek. Dinding Partisi Kalsiboard rangka aluminium 26.72 m2

H PEKERJAAN ATAP

1 Pek. Kuda-kuda baja ringan profil C + talang air + aksesoris 431.74 m2

2 Pas. Penutup atap genteng plentong 431.74 m2

sisi pajang 358.54

sisi pendek 73.20

3 Pas. Bubungan genteng plentong 53.78 m'

4 Pas. Murda paras 2.00 bh

5 Pas. Ikut celedu paras 4.00 bh

6 Pas. Aluminium foil 431.74 m2

7 Pek. Lislpank kayu kamper 2 x 2/20 cm 83.92 m'

I PEKERJAAN PLAFOND

1 Pas. Penutup plafond gypsum 9 mm + rangka metal furing 214.15 m2

2 Pas. Penutup plafond kalsiboard 4.5 mm + rangka metal furin 154.17 m2

3 Pas. List plafond gypsum 9 cm 180.96 m'

4 Pas. List plafond gypsum 4 cm 302.40 m'

J PEKERJAAN PENUTUP LANTAI DAN DINDING

1 Pas. Keramik lantai 40 x 40 cm polos (A) 234.25 m2

2 Pas. Keramik lantai 40 x 40 cm anti slip (B) 96.41 m2

3 Pas. Keramik lantai 20 x 20 cm untuk KM/WC ( C ) 13.04 m2

4 Pas. Plint keramik lantai 10 x 40 cm 228.62 m'

5 Pas. Keramik dinding 25 x 20 cm 242.69 m2

6 Pas. Keramik dinding 25 x 20 cm untuk KM/WC 38.54 m2

7 Pas. Border keramik dinding 10 x 20 cm 161.79 m'

Page 48: Rab Puskesmas Tembuku II 15062012

8 Pas. Kaca cermin tebal 3 mm 1.75 m2

K PEKERJAAN PENGECATAN

1 Pek. Pengecatan tembok interior setara Vinilex 910.77 m2

2 Pek. Pengecatan tembok exterior setara Propan 179.00 m2

2 Pek. Pengecatan plafond + lis gypsum setara Vinilex 214.15 m2

3 Pek. Polituran listplank kayu + tatab 36.19 m2

4 Pek. Waterproofing 280.49 m2

plat kanopi 280.49

5 Pek. Coating tempelan bata dan paras 47.95 m2

L PEKERJAAN PLUMBING

1 Pas. Stop kran 3/4 " setara Kits 1.00 bh

2 Pek. Clean Out 4.00 bh

3 Pas. Kloset duduk + aksesoris setara Toto 3.00 bh

4 Pas. Wastafel + aksesoris setara Toto 5.00 bh

5 Pas. Floor drain setara Toto 3.00 bh

6 Pas. Shower + aksesoris setara Toto 3.00 bh

7 Pas. Bak cuci stainless steel setara Royal 2.00 bh

8 Pas. Kran air leher angsa setar Toto 2.00 bh

9 Pas. Kran air untuk wastafel setara Toto 5.00 bh

10 Pas. Kran air biasa setara Toto - bh

11 Pas. Tempat sabun setara Toto 3.00 bh

12 Pek. Grease Trap - unit

13 Pek. Septicktank + peresapan 1.00 unit

N PEKERJAAN STYLE BALI

1 Tempelan paras sarwa genep pd kolom 15.60 m2

2 Tempelan batu candi pada kolom 0.54 m2

3 Tempelan paras sarwa genep keliling tembok 47.95 m2

4 Tempelan batu candi keliling tembok 19.98 m2

5 Tempelan batu candi pada kursi beton 2.57 m2

O PEKERJAAN LAIN-LAIN

1 Pas. Tanaman hias 2.78 m2

2 Pek. Box tanaman fin. Batu Candi 7.39 m2

3 Pek. Pagar beton cetak 18.00 m1

4 Pas. Railing stainless steel 2" untuk ramp 21.08 m'

Page 49: Rab Puskesmas Tembuku II 15062012

PANJANG LEBAR TINGGI JML -

89.97

794.83 794.83 643.81

180.86 3.30 643.81

180.86 0.03 3.00 0.02 54

180.86 0.03 28.74 0.50

201.52 0.92 201.52 1.44

0.30 409.02 201.52 0.06

0.05 409.02

201.52 0.23 201.52 0.47

3.40 56

83.92 0.18 0.15 10.17 0.10 2.23

409.02 3.03 0.38

LUAS PENMPG

Page 50: Rab Puskesmas Tembuku II 15062012

6.75 0.05 0.12

286.99 3.34 .

49.09

8.00 3.34

179.27 73.20

13.44 4

83.92

214.15 154.17

180.96 302.40

234.25 96.41 13.04

228.62 161.79 1.50 25.69 1.50 161.79

Page 51: Rab Puskesmas Tembuku II 15062012

0.35 5

910.77 79.91 2.24

180.96 0.20

180.96 1.55

2.60 6 0.09 6

79.91 0.60 39.96 0.50

2.57

2.78 7.39

18.00 1.00 21.08

#REF!

Page 52: Rab Puskesmas Tembuku II 15062012

NO. TYPE KUSEN JUMLAHPANJANG KUSEN LUAS DAUN PINTU POLOS LUAS DAUN PINTU + KACA

per unit TOTAL per unit TOTAL per unit1 P1 3 8.91 26.73 3.362 P2 8 7.72 61.76 2.523 P3 4 6.89 27.56 1.68 6.724 P4 3 6.69 20.07 1.47 4.415 P5 1 6.75 6.75 4.956 P6 Pintu geser kalsiboard r 1 2.21 2.217 J1 18 8.66 155.888 J2 6 6.26 37.569 J3 1 6.16 6.16

10 V1 3 1.78 5.34347.81 11.13

Page 53: Rab Puskesmas Tembuku II 15062012

LUAS DAUN PINTU + KACA LUAS DAUN JENDELA + KACA LUAS KACA MATI REL PINTU GESER HANDLE PINTU KUNCI PINTU

TOTAL per unit TOTAL per unit TOTAL per unit TOTAL per unit TOTAL per unit TOTAL10.08 0.9 2.7 1 3 1 320.16 0.51 4.08 1 8 1 8

0.34 1.36 1 4 1 40.32 0.96 1 3 1 3

1 1 1 11

1.41 25.380.35 2.1

0.96 0.960.09 0.27

30.24 36.58 1.23 19 19

Page 54: Rab Puskesmas Tembuku II 15062012

ESPAGNOLET DOOR CLOSER ENGSEL PINTU ENGSEL JENDELA GRENDEL PINTU GRENDEL JENDELA LAMSKAR

per unit TOTAL per unit TOTAL per unit TOTAL per unit TOTAL per unit TOTAL per unit TOTAL per unit2 6 4 12 2 6 2 6 21 8 4 32 2 16 1 8 1 8 1

2 8 2 8 1 4 12 6 2 6 1 3 1

12 124 4

8 144 4 72 44 24 2 12 4

0 14 74 204 8 105

Page 55: Rab Puskesmas Tembuku II 15062012

LAMSKAR

TOTAL6843

7224

117

Page 56: Rab Puskesmas Tembuku II 15062012

DAFTAR BERAT BESI POLOS (PANJANG 12 M)

KONTROL

1 6 2.66 2.66 2 6.5 3.20 3.13 3 8 4.74 4.73 4 9 6.00 5.99 5 10 7.40 7.40 6 12 10.70 10.65 7 13 12.50 12.50 8 14 14.50 14.50 9 16 19.00 18.94

10 19 26.80 26.71 11 22 35.80 35.81 12 23 39.10 39.14 13 25 46.20 46.24 14 28 58.00 58.00 15 31 71.10 71.09 16 32 75.77 75.76

RUMUS MENGHITUNG BERAT BESI :

DIA x DIA x 0,006165 x 12

DAFTAR BERAT BESI ULIR (PANJANG 12 M)

KONTROL

1 6 2.99 2.66 2 10 7.40 7.40 3 13 12.48 12.50 4 16 18.96 18.94 5 19 26.76 26.71 6 22 35.76 35.81 7 25 46.20 46.24 8 29 62.28 62.22 9 32 75.72 75.76

10 35 90.10 90.63 11 36 95.88 95.88 12 38 ### 106.83 13 41 ### 124.36

NO.

DIAMETER (MM)

BERAT (KG)

NO.

DIAMETER (MM)

BERAT (KG)

Page 57: Rab Puskesmas Tembuku II 15062012

PERHITUNGAN BERAT BESI

TULANGAN UTAMA

LBR TGI DIA JML PJG

A SLOOF

1 S 15/30 0.15 0.30 0.045 22.22 13 4 1.00 4.00 4.17 92.61

- - -

2 S 15/20 0.15 0.20 0.030 33.33 8 4 1.00 4.00 1.58 52.61

-

B KOLOM

1 K1 15/30 0.15 0.30 0.045 22.22 13 8 1.00 8.00 8.34 185.22

2 K1a 15/30 0.15 0.30 0.045 22.22 13 12 1.00 12.00 12.50 277.84

3 K2 30/30 0.30 0.30 0.090 11.11 13 12 1.00 12.00 12.50 138.92

4 K3 15/25 0.15 0.25 0.038 26.67 13 4 1.00 4.00 4.17 111.13

C BALOK

1 B1 20/30 0.20 0.30 0.060 16.67 13 5 1.00 5.00 5.21 86.82

2 B2 15/25 0.15 0.25 0.038 26.67 13 4 1.00 4.00 4.17 111.13

3 B3 20/50 0.20 0.50 0.100 10.00 13 6 1.00 6.00 6.25 62.51

0.100 10.00 8 2 1.00 2.00 0.79 7.89

4 B4 15/30 0.15 0.30 0.045 22.22 13 4 1.00 4.00 4.17 92.61

D RING BALOK

1 - ### 1.00 - - #DIV/0!

2 - ### 1.00 - - #DIV/0!

3 - ### 1.00 - - #DIV/0!

NO.

TIPE BETON

DIMENSI BETON

LUAS PENAMPAN

G BETO

N

KOEF PER M3 JML

PJG

BERAT

/M'

BERAT /M3

Page 58: Rab Puskesmas Tembuku II 15062012

E PLAT LANTAI

1 TEBAL 12 CM UKURAN ACUAN 1 X 1 M2

1.00 0.12 0.120 8.33 TULANGAN ATAS

1.00 0.12 0.120 8.33 TULANGAN BAWAH

1.00 0.12 0.120 8.33 TULANGAN EKSTRA

2 TEBAL 10 CM UKURAN ACUAN 1 X 1 M2

1.00 0.10 0.100 10.00 TULANGAN ATAS

1.00 0.10 0.100 10.00 TULANGAN BAWAH

1.00 0.10 0.100 10.00 TULANGAN EKSTRA

F PONDASI BOR PILE

1 PONDASI PLAT P1

0.50 1.168 0.86 HORISONTAL ATAS

1.168 0.86 HORISONTAL BAWAH

1.168 0.86 VERTIKAL ATAS

1.168 0.86 VERTIKAL BAWAH

2 PONDASI PLAT P2

0.40 0.256 3.91 HORISONTAL ATAS

0.256 3.91 HORISONTAL BAWAH

0.256 3.91 VERTIKAL ATAS

0.256 3.91 VERTIKAL BAWAH

3 BOR PILE 0.125 3.14 0.049 20.38 13 6 1.20 7.20 7.50 152.90

G TANGGA

1 TEBAL 12 CM UKURAN ACUAN 1 X 1 M2

1.00 0.12 0.120 8.33 TULANGAN ATAS

1.00 0.12 0.120 8.33 TULANGAN BAWAH

1.00 0.12 0.120 8.33 TULANGAN EKSTRA

0.13

Page 59: Rab Puskesmas Tembuku II 15062012

40.00 60.00

Page 60: Rab Puskesmas Tembuku II 15062012

TULANGAN SENGKANG

DIA PJG JML

0.020 8 0.89 0.125 9.0 9 8.01 3.16 70.23 ### 160

0.020 8 0.69 0.125 9.0 9 6.21 2.45 81.67 ### 130

0.020 8 0.89 0.125 9.0 9 8.01 3.16 70.23 ### 260

0.020 8 0.89 0.125 9.0 9 8.01 3.16 70.23 ### 350

0.025 8 1.15 0.125 9.0 9 10.35 4.08 45.37 ### 180

0.020 8 0.79 0.125 9.0 9 7.11 2.81 74.81 ### 190

0.025 8 0.95 0.125 9.0 9 8.55 3.37 56.22 ### 140

0.020 8 0.79 0.125 9.0 9 7.11 2.81 74.81 ### 190

0.025 8 1.35 0.125 9.0 9 12.15 4.79 47.94 ### 120

0.020 8 0.89 0.125 9.0 9 8.01 3.16 70.23 ### 160

0.020 8 (0.01) 0.125 9.0 9 (0.09) (0.04) #DIV/0! #DIV/0! ###

0.020 8 (0.01) 0.125 9.0 9 (0.09) (0.04) #DIV/0! #DIV/0! ###

0.020 8 (0.01) 0.125 9.0 9 (0.09) (0.04) #DIV/0! #DIV/0! ###

BERAT BESI

(KG/M3)

fe (kg/m3

)

SELIMUT

BETON

JRK SKG

JML PJG

BERAT

/M'

BERAT /

M3

Page 61: Rab Puskesmas Tembuku II 15062012

UKURAN ACUAN 1 X 1 M2 ### 150

TULANGAN ATAS 10 2.20 0.250 5.0 5 11.00 6.78 56.51

TULANGAN BAWAH 10 2.20 0.250 5.0 5 11.00 6.78 56.51

TULANGAN EKSTRA 10 1.20 0.250 5.0 5 6.00 3.70 30.83

UKURAN ACUAN 1 X 1 M2 ### 120

TULANGAN ATAS 8 2.20 0.250 5.0 5 11.00 4.34 43.40

TULANGAN BAWAH 8 2.20 0.250 5.0 5 11.00 4.34 43.40

TULANGAN EKSTRA 8 1.20 0.250 5.0 5 6.00 2.37 23.67

### 140

HORISONTAL ATAS 13 0.150 11 17.19 17.91 15.34

HORISONTAL BAWAH 16 0.150 11 28.19 44.49 38.11

VERTIKAL ATAS 13 0.150 12 19.90 20.73 17.76

VERTIKAL BAWAH 16 0.150 12 43.90 69.28 59.34

### 160

HORISONTAL ATAS 13 0.150 5 4.50 4.69 18.31

HORISONTAL BAWAH 16 0.150 5 10.00 15.78 61.65

VERTIKAL ATAS 13 0.150 5 4.50 4.69 18.31

VERTIKAL BAWAH 16 0.150 5 10.00 15.78 61.65

0.025 8 0.75 0.150 ### 8 5.97 2.36 48.03 ### 210

UKURAN ACUAN 1 X 1 M2 ### 150

TULANGAN ATAS 10 2.20 0.250 5.0 5 11.00 6.78 56.51

TULANGAN BAWAH 10 2.20 0.250 5.0 5 11.00 6.78 56.51

TULANGAN EKSTRA 10 1.20 0.250 5.0 5 6.00 3.70 30.83

0.189