KECAMATAN BUKIT RAYA DAFTAR HARGA SATUAN BAHAN DAN UPAH KERJA NO MATERIAL / BARANG SATUAN HARGA (Rp) 1 2 3 4 BAHAN BANGUNAN 1 Pasir pasang ### 2 # Kerikil Zak ### 3 Semen PC ( isi 40 Kg ) Gresik Bh ### 4 Kayu Ulin 10/10 cm - 4 M Btg Rp. 90,000- 5/10 cm - 4 M Btg Rp. 60,000- 8/8 cm - 4 M Btg Rp. 75,000- 5/7 cm - 4 M Btg Rp. 40,000- 5/5 cm - 4 M Btg Rp. 30,000- 3/20 cm - 4 M Kpg ### 2/20 cm - 4 M Kpg Rp. 60,000- 5 Kayu Meranti 10/10 cm - 4 M Btg Rp. 60,000- 5/10 cm - 4 M Btg Rp. 30,000- 8/8 cm - 4 M Btg Rp. 40,000- 5/7 cm - 4 M Btg Rp. 25,000- 5/5 cm - 4 M Btg Rp. 15,000- 3/5 cm - 4 M Kpg Rp. 10,000- 2/20 cm - 4 M Kpg Rp. 25,000- 6 Paku Kayu Kg Rp. 30,000- 7 Paku Ulin Kg Rp. 50,000- 8 Paku Triplek Kg Rp. 30,000- 9 Paku anti karat Kg Rp. 50,000- 10 Besi Beugel / Baut ( Kuda-kuda Kg Rp. 45,000- 11 Genteng metal Prima colour teba Rp. 95,000- 12 Bubungan Genteng metal M' Rp. 30,000- 13 Seng plat 3" x 6" BJLS 28 Lbr Rp. 60,000- 14 Plywood 3 mm Lbr Rp. 65,000- 15 Bak Mandi Fibreglass ukuran sed Bh ### 16 Closed jongkok porselen Bh ### 17 Pipa PVC diameter 2" AW (Maspio Btg Rp. 70,000- 18 Pipa PVC diameter 4" AW (Maspio Btg ### 19 Cat Kayu Mengkilat merk Platon Kg Rp. 60,000- 20 Cat Menie Kg Rp. 30,000- 21 Cat Dasar Kg Rp. 25,000- 22 Kran Air Kg Rp. 25,000- 23 Baut 10 cm s/d 24 cm Kg Rp. 20,000- 24 Minyak Cat ( Thiner A ) Ltr Rp. 25,000- 25 Hitachi Bh ### 26 Sambungan, L, T, PVC Lbr Rp. 10,000- 27 Engsel jendela ( kualitas stand Bh Rp. 15,000- 28 Engsel pintu ( kualitas standa Bh Rp. 20,000- 29 Kunci tanam 2 slag Bh ### 30 Kaca bening ukuran 3 mm ### 31 Septicktank Unit ###

Upload: rhee-c-sulunk

Post on 30-Jul-2015

501 views

Category:

Documents


74 download

TRANSCRIPT

Page 1: Rab Posyandu Bhkng

KECAMATAN BUKIT RAYA

DAFTAR HARGA SATUAN BAHAN DAN UPAH KERJA

NO MATERIAL / BARANG SATUAN HARGA (Rp) KET.

1 2 3 4 5

BAHAN BANGUNAN1 Pasir pasang M³ Rp. 200,000- 2 ###Kerikil Zak Rp. 200,000- 3 Semen PC ( isi 40 Kg ) Gresik Bh Rp. 150,000- 4 Kayu Ulin

10/10 cm - 4 M Btg Rp. 90,000- 5/10 cm - 4 M Btg Rp. 60,000- 8/8 cm - 4 M Btg Rp. 75,000- 5/7 cm - 4 M Btg Rp. 40,000- 5/5 cm - 4 M Btg Rp. 30,000- 3/20 cm - 4 M Kpg Rp. 125,000- 2/20 cm - 4 M Kpg Rp. 60,000-

5 Kayu Meranti10/10 cm - 4 M Btg Rp. 60,000- 5/10 cm - 4 M Btg Rp. 30,000- 8/8 cm - 4 M Btg Rp. 40,000- 5/7 cm - 4 M Btg Rp. 25,000- 5/5 cm - 4 M Btg Rp. 15,000- 3/5 cm - 4 M Kpg Rp. 10,000- 2/20 cm - 4 M Kpg Rp. 25,000-

6 Paku Kayu Kg Rp. 30,000- 7 Paku Ulin Kg Rp. 50,000- 8 Paku Triplek Kg Rp. 30,000- 9 Paku anti karat Kg Rp. 50,000-

10 Besi Beugel / Baut ( Kuda-kuda ) Kg Rp. 45,000- 11 Genteng metal Prima colour tebal 0,35 mm M² Rp. 95,000- 12 Bubungan Genteng metal M' Rp. 30,000- 13 Seng plat 3" x 6" BJLS 28 Lbr Rp. 60,000- 14 Plywood 3 mm Lbr Rp. 65,000- 15 Bak Mandi Fibreglass ukuran sedang Bh Rp. 200,000- 16 Closed jongkok porselen Bh Rp. 150,000- 17 Pipa PVC diameter 2" AW (Maspion) Btg Rp. 70,000- 18 Pipa PVC diameter 4" AW (Maspion) Btg Rp. 180,000- 19 Cat Kayu Mengkilat merk Platon Kg Rp. 60,000- 20 Cat Menie Kg Rp. 30,000- 21 Cat Dasar Kg Rp. 25,000- 22 Kran Air Kg Rp. 25,000- 23 Baut 10 cm s/d 24 cm Kg Rp. 20,000- 24 Minyak Cat ( Thiner A ) Ltr Rp. 25,000- 25 Hitachi Bh Rp. 600,000- 26 Sambungan, L, T, PVC Lbr Rp. 10,000- 27 Engsel jendela ( kualitas standart ) Bh Rp. 15,000- 28 Engsel pintu ( kualitas standart ) Bh Rp. 20,000- 29 Kunci tanam 2 slag Bh Rp. 150,000- 30 Kaca bening ukuran 3 mm M² Rp. 150,000- 31 Septicktank Unit Rp. 3,000,000-

Page 2: Rab Posyandu Bhkng

1 2 3 4 5

NO. URAIAN TENAGA SATUAN KET

1 2 3 4 5

1 Tukang Batu HOK Rp. 90,000- 6 jam/hari 2 Tukang Kayu HOK Rp. 90,000- 6 jam/hari 3 Tukang Pancang HOK Rp. 90,000- 6 jam/hari 4 Tukang Cat HOK Rp. 90,000- 6 jam/hari 5 Pekerja HOK Rp. 70,000- 6 jam/hari

NO. HARGA BAHAN JADI SATUAN HARGA (Rp) KET

1 2 3 4 5

1 Pintu Panel Kayu Meranti Unit 700,000 2 Bingkai Jendela Unit 180,000 3 Papan sudah dimoulding Kpg 50,000 4 Almari Buku Unit 1,200,000 5 Meja 1/2 biro Unit 500,000 6 Meja belajar Unit 250,000 7 Satu Kursi TK + Meja Set 350,000

UPAH HARIAN

Page 3: Rab Posyandu Bhkng

DAFTAR ANALISA PEKERJAANDINAS PEKERJAAN UMUM KABUPATEN KOTAWARINGIN TIMUR

TRIWULAN TAHUN : 2009

URAIAN PEKERJAAN UPAH BAHAH

1 2 3 4 5

PEKERJAAN PERSIAPAN

01.6.4 1 M' Pengukuran dan pasang bouwplank

0.0120 M³ Kasau 5/7 cm Rp. 60,000- Rp. 720- 0.0070 M³ Kayu papan 3/20 cm Rp. 25,000- Rp. 175- 0.0200 Kg Paku kayu 2" - 5" Rp. 30,000- Rp. 600- 0.1000 Pekerja Rp. 70,000- Rp. 7,000- 0.1000 Tukang kayu Rp. 90,000- Rp. 9,000-

Rp. 16,000- Rp. 1,495-

PEKERJAAN TANAH

02.6.1 1 M³ Galian tanah biasa sedalam 1 meter.

0.4000 Pekerja Rp. 70,000- Rp. 28,000- Rp. 28,000- Rp -

02.6.9 1 M³ Urugan kembali

0.1920 Pekerja Rp. 70,000- Rp. 13,440- Rp. 13,440- Rp -

PEKERJAAN KAYU

06.6.8 1 M² Pasang pintu panel kayu lanan

0.0400 M³ Papan kayu lanan Rp. 25,000- Rp. 1,000- 1.0000 Pekerja Rp. 70,000- Rp. 70,000- 2.5000 Tukang kayu Rp. 90,000- Rp. 225,000-

Rp. 295,000- Rp. 1,000-

06.6.9 1 M² Pasang pintu dan jendela kaca kayu ulin

0.0350 M³ Papan kayu ulin Rp. 60,000- Rp. 2,100- 0.8000 Pekerja Rp. 70,000- Rp. 56,000- 2.0000 Tukang kayu Rp. 90,000- Rp. 180,000-

Rp. 236,000- Rp. 2,100-

06.6.28 1 M³ Pasang konstruksi kuda-kuda kayu lanan

1.100 M³ Balok kayu lanan Rp. 125,000- Rp. 137,500- 15.000 Kg Besi strip Rp. 45,000- Rp. 675,000- 0.800 Kg Paku biasa 2" - 5" Rp. 30,000- Rp. 24,000- 4.000 Pekerja Rp. 70,000- Rp. 280,000- 12.000 Tukang kayu Rp. 90,000- Rp. 1,080,000-

Rp. 1,360,000- Rp. 836,500-

06.6.31 1 M² Pasang kasau + reng genteng metal kayu lanan

0.0120 M³ Balok kayu lanan Rp. 125,000- Rp. 1,500- 0.1500 Kg Paku biasa 2" - 5" Rp. 30,000- Rp. 4,500- 0.1000 Pekerja Rp. 70,000- Rp. 7,000- 0.1000 Tukang kayu Rp. 90,000- Rp. 9,000-

Rp. 16,000- Rp. 6,000-

06.6.39 1 M² Pasang rangka langit-langit (60 x 120) cm kayu lanan

0.0120 M³ Balok kayu lanan Rp. 125,000- Rp. 1,500- 0.1000 Kg Paku biasa 2" - 5" Rp. 30,000- Rp. 3,000- 0.1500 Pekerja Rp. 70,000- Rp. 10,500- 0.2500 Tukang kayu Rp. 90,000- Rp. 22,500-

ANALISA ( SNI )

HARGA SATUAN

Page 4: Rab Posyandu Bhkng

1 2 3 4 5 Rp. 33,000- Rp. 4,500-

Page 5: Rab Posyandu Bhkng

1 2 3 4 5 06.6.53a 1 M' Pasang lisplang ukuran (2 x 20 dan 2 x 10 ) cm, kayu Ulin

0.0090 M3 Papan kayu ulin Rp. 60,000- Rp. 540- 0.0500 Kg Paku ulin Rp. 50,000- Rp. 2,500- 0.1100 Pekerja Rp. 70,000- Rp. 7,700- 0.2200 Tukang kayu Rp. 90,000- Rp. 19,800-

Rp. 27,500- Rp. 3,040-

06.6.60 1 M' Pasang list plafond kayu profil

1.0500 M' Kayu profil Rp. 15,000- Rp. 15,750- 0.0100 Kg Paku biasa Rp. 30,000- Rp. 300- 0.0210 Pekerja Rp. 70,000- Rp. 1,470- 0.0210 Tukang kayu Rp. 90,000- Rp. 1,890-

Rp. 3,360- Rp. 16,050- F.22 1 M³ Pekerjaan rangka badan bahan kayu ulin

1.1000 M³ Balok kayu ulin Rp - Rp - 6.0000 Kg Paku ulin Rp. 50,000- Rp. 300,000- 8.0000 Pekerja Rp. 70,000- Rp. 560,000- 24.000 Tukang kayu Rp. 90,000- Rp. 2,160,000-

Rp. 2,720,000- Rp. 300,000-

F.38a 1 M² Lantai kayu ulin tebal 2 cm diserut rapi

0.0233 M³ Papan kayu ulin Rp. 60,000- Rp. 1,398- 0.2000 Kg Paku ulin Rp. 50,000- Rp. 10,000- 0.6000 Pekerja Rp. 70,000- Rp. 42,000- 1.8000 Tukang kayu Rp. 90,000- Rp. 162,000-

Upah 1/2 x F38 Rp. 102,000- Rp. 11,398-

F.38e 1 M² Dinding kayu ulin tebal 2 cm diserut rapi dengan sambungan lidah alur 0.0230 M³ Papan kayu ulin Rp. 60,000- Rp. 1,380- 0.2000 Kg Paku ulin Rp. 50,000- Rp. 10,000- 0.6000 Pekerja Rp. 70,000- Rp. 42,000- 1.8000 Tukang kayu Rp. 90,000- Rp. 162,000-

Upah 3/4 x F38e Rp. 153,000- Rp. 11,380- F.38f 1 M² Dinding kayu lanan tebal 2 cm diserut rapi

dengan sambungan lidah alur 0.0230 M³ Papan kayu lanan Rp. 25,000- Rp. 575- 0.2000 Kg Paku kayu Rp. 30,000- Rp. 6,000- 0.6000 Pekerja Rp. 70,000- Rp. 42,000- 1.8000 Tukang kayu Rp. 90,000- Rp. 162,000-

Upah 3/4 x F38f Rp. 153,000- Rp. 6,575-

PEKERJAAN PENUTUP ATAP

08.6.32 1 M² Pasang atap genteng metal

1.0200 M² Gtg Prima colour tbl 0,35 mm Rp. 95,000- Rp. 96,900- 0.0750 Kg Paku anti karat Rp. 50,000- Rp. 3,750- 0.2000 Pekerja Rp. 70,000- Rp. 14,000- 0.1000 Tukang kayu Rp. 90,000- Rp. 9,000-

Genteng Prima colour tbl 0,35 mm …………… Rp. 23,000- Rp. 100,650- 08.6.33 1 M² Pasang atap sirap60.0000 Lb Sirap Rp. 900- Rp. 54,000- 0.2000 Kg Paku sirap Rp. 13,800- Rp. 2,760- 0.1660 Pekerja Rp. 70,000- Rp. 11,620- 0.2500 Tukang kayu Rp. 90,000- Rp. 22,500- 0.0250 Kepala tukang Rp - Rp - 0.0080 Mandor Rp - Rp - Rp. 34,120- Rp. 56,760- 08.6.36 1 M' Pasang nok genteng metal

1.0000 M' Bubungan metal Rp. 30,000- Rp. 30,000- 0.0075 Kg Paku anti karat Rp. 50,000- Rp. 375- 0.2500 Pekerja Rp. 70,000- Rp. 17,500- 0.1500 Tukang kayu Rp. 90,000- Rp. 13,500-

Rp. 31,000- Rp. 30,375-

Page 6: Rab Posyandu Bhkng

1 2 3 4 5 PEKERJAAN LANGIT - LANGIT.

09.6.10a 1 M² Langit-langit Plyawood (60 x 120) cm, tebal 3 mm.

0.3750 Lb Plyawood 3mm Rp. 65,000- Rp. 24,375- 0.0300 Kg Paku plywood Rp. 30,000- Rp. 900- 0.0700 Pekerja Rp. 70,000- Rp. 4,900- 0.1000 Tukang kayu Rp. 90,000- Rp. 9,000-

Rp. 13,900- Rp. 25,275-

PEKERJAAN SANITASI.

10.6.3 Memasang 1 buah closed jongkok teraso

1.0000 Bh Closed jongkok teraso Rp. 150,000- Rp. 150,000- 7.0000 Bh Bata merah 5 x 11 x 22 cm Rp. 150,000- Rp. 1,050,000- 6.0000 Kg Semen PC Rp. 200,000- Rp. 1,200,000- 0.0100 M³ Pasir pasang Rp. 200,000- Rp. 2,000- 1.0000 Pekerja Rp. 70,000- Rp. 70,000- 1.5000 Tukang batu Rp. 90,000- Rp. 135,000-

Rp. 205,000- Rp. 2,402,000-

10.6.6 Memasang 1 buah bak mandi teraso volume 0,30 m³

1.0000 Bh Bak teraso Rp. 200,000- Rp. 200,000- 6.0000 Kg Semen PC Rp. 200,000- Rp. 1,200,000- 0.0100 M³ Pasir pasang Rp. 200,000- Rp. 2,000- 2.1000 Pekerja Rp. 70,000- Rp. 147,000- 0.7500 Tukang batu Rp. 90,000- Rp. 67,500-

Rp. 214,500- Rp. 1,402,000-

11.6.19 1 M' Pasang talang miring, seng BJLS 28

0.5000 Lbr Seng plat 3' x 6' BJLS 28 Rp. 60,000- Rp. 30,000- 0.0150 Kg Paku biasa ½" - 1" Rp. 30,000- Rp. 450- 0.0190 M³ Kayu borneo papan #REF! #REF!0.0400 Pekerja Rp. 70,000- Rp. 2,800- 0.4000 Tukang kayu Rp. 90,000- Rp. 36,000-

Rp. 38,800- #REF!

PEKERJAAN KUNCI DAN KACA

12.6.2 1 Buah pasang kunci tanam biasa

1.0000 Bh Kunci tanam biasa Rp. 150,000- Rp. 150,000- 0.0100 Pekerja Rp. 70,000- Rp. 700- 0.5000 Tukang kayu Rp. 90,000- Rp. 45,000-

Rp. 45,700- Rp. 150,000-

12.6.5 1 Buah pasang engsel pintu

1.0000 Bh Engsel pintu Rp. 20,000- Rp. 20,000- 0.0150 Pekerja Rp. 70,000- Rp. 1,050- 0.1500 Tukang kayu Rp. 90,000- Rp. 13,500-

Rp. 14,550- Rp. 20,000-

12.6.6 1 Buah pasang engsel jendela kupu-kupu

1.0000 Bh Engsel jendela Rp. 15,000- Rp. 15,000- 0.0100 Pekerja Rp. 70,000- Rp. 700- 0.1000 Tukang kayu Rp. 90,000- Rp. 9,000-

Rp. 9,700- Rp. 15,000-

12.6.17 1 M² pasang kaca, tebal 5 mm

1.1000 M² Kaca tebal 5 mm Rp. 150,000- Rp. 165,000- 0.0150 Pekerja Rp. 70,000- Rp. 1,050- 0.1500 Tukang kayu Rp. 90,000- Rp. 13,500-

Rp. 14,550- Rp. 165,000-

Page 7: Rab Posyandu Bhkng

1 2 3 4 5 PEKERJAAN PENGECATAN

14.6.6 1 M² Mendempul dan menggosok kayu

0.0800 Kg Dempul jadi Rp. 20,000- Rp. 1,600-

0.0200 Kg Minyak cat Rp. 25,000- Rp. 500-

0.0100 Kg Batu apung Rp. 10,000- Rp. 100-

0.0400 Pekerja Rp. 70,000- Rp. 2,800-

0.0400 Tukang cat Rp. 90,000- Rp. 3,600-

Rp. 6,400- Rp. 2,200-

14.6.8 1 M² Pengecatan bidang kayu baru (1 lapis plamir,

1 lapis cat dasar, 2 lapis cat penutup)

0.2000 Kg Cat meni Rp. 30,000- Rp. 6,000-

0.1500 Kg Plamir Rp. 25,000- Rp. 3,750-

0.1700 Kg Cat dasar Rp. 25,000- Rp. 4,250-

0.2600 Kg Cat penutup Rp. 60,000- Rp. 15,600-

0.0700 Pekerja Rp. 70,000- Rp. 4,900-

0.0090 Tukang cat Rp. 90,000- Rp. 810-

Rp. 5,710- Rp. 29,600-

14.6.12 1 M² Pelaburan bidang kayu dengan cat residu dan ter

0.3500 Ltr Ter atau residu Rp. 600,000- Rp. 210,000- 0.1000 Pekerja Rp. 70,000- Rp. 7,000-

Rp. 7,000- Rp. 210,000-

14.6.14 1 M² Pengecatan bidang tembok baru (1 lapis plamir,

1 lapis cat dasar, 2 lapis cat penutup).0.1000 Kg Plamir Rp. 25,000- Rp. 2,500- 0.1000 Kg Cat dasar Rp. 25,000- Rp. 2,500- 0.2600 Kg Cat penutup 2 x Rp. 60,000- Rp. 15,600- 0.0200 Pekerja Rp. 70,000- Rp. 1,400- 0.0630 Tukang cat Rp. 90,000- Rp. 5,670-

Rp. 7,070- Rp. 20,600-

E.4 Membuat 1 Pasang Pen dan Lobang

0.6000 Tukang Kayu Rp. 90,000- Rp. 54,000- Rp. 54,000-

Upah x 1/4 Rp. 13,500-

E.13 1 M' Tiang Dipancang kedalam Tanah

(Dihitung Bagian Yang Masuk )

0.6000 Pekerja Rp. 70,000- Rp. 42,000- 0.0400 Tukang Kayu Rp. 90,000- Rp. 3,600-

Rp. 45,600- Upah x 1/4 Rp. 11,400-

11.2.6 1 M3 Pasang Gording Bahan Kayu Lanan

(Kayu Kls Kuat II) :

5.8000 Tukang Kayu Rp. 90,000- Rp. 522,000- 1.9400 Pekerja Rp. 70,000- Rp. 135,800- 1.1000 Rp. 125,000- Rp. 137,500- Rp. 137,500- 2.2000 Kg Paku Biasa (Paku Kayu) Rp. 30,000- Rp. 66,000- Rp. 66,000-

Rp - Rp. 203,500-

11.2.4

Kayu Lanan (Kayu Kls Kuat II) :

20.0000 Tukang Kayu Rp. 90,000- Rp. 1,800,000- 6.7000 Pekerja Rp. 70,000- Rp. 469,000- 1.1000 Rp. 125,000- Rp. 137,500- Rp. 137,500- 3.0000 Kg Paku Biasa Rp. 30,000- Rp. 90,000- Rp. 90,000-

15.0000 Kg Besi Strip/Mur Baut Rp. 45,000- Rp. 675,000- Rp. 675,000-

M3 Balok Lanan

1 M3 Kuda-Kuda Bentang 6 s/d 9 m

M3 Balok Lanan

Page 8: Rab Posyandu Bhkng

1 2 3 4 5 Rp - Rp. 902,500-

Page 9: Rab Posyandu Bhkng

DAFTAR ANALISA PEKERJAANDINAS PEKERJAAN UMUM KABUPATEN KOTAWARINGIN TIMUR

JUMLAH

6

Rp. 17,495-

Rp. 28,000-

Rp. 13,440-

Rp. 296,000-

Rp. 238,100-

Rp. 2,196,500-

Rp. 22,000-

Page 10: Rab Posyandu Bhkng

6 Rp. 37,500-

Page 11: Rab Posyandu Bhkng

6

Rp. 30,540-

Rp. 19,410-

Rp. 3,020,000-

Rp. 113,398-

Rp. 164,380-

Rp. 159,575-

Rp. 123,650- Rp. 90,880-

Rp. 61,375-

Page 12: Rab Posyandu Bhkng

6

Rp. 39,175-

Rp. 2,607,000-

Rp. 1,616,500-

#REF!

Rp. 195,700-

Rp. 34,550-

Rp. 24,700-

Rp. 179,550-

Page 13: Rab Posyandu Bhkng

6

Rp. 8,600-

Rp. 35,310-

Rp. 217,000-

Rp. 27,670-

Rp. 54,000- Rp. 13,500-

Rp. 45,600- Rp. 11,400-

Rp. 203,500-

Page 14: Rab Posyandu Bhkng

6 Rp. 902,500-

Page 15: Rab Posyandu Bhkng

Kabupaten

Take Of SheetKecamatan : Bukit RayaDesa : Rangan Bahekang

a b c

2. PEKERJAAN TANAH2.a. Pekerjaan Penggalian Tanah Pondasi

Volume (((0.60+0.80)/2)x0.50) x ((8.40x7)+(3.40x2)) 22.96 meter kubikBahan :- - -

Upah :- Pekerja 0.4000 x 22.96 9.18 HOK

2.b. Pekerjaan Pengurugan Kembali Tanah GalianVolume 3/4 xVolume Galian

0.75 x 22.96 17.22 meter kubikBahan :- - -

Upah :- Pekerja 0.1920 x 17.22 3.31 HOK

3. PEKERJAAN PONDASIPondasi dari Bahan Tiang Pancang Kayu Ulin 10/10 cmVolume : Bangunan Utama 8 x 7 = 56

: Bangunan Teras 4 x 2 = 8- Total Tiang Pondasi Total Bahan = 64 64 Buah

Bahan :- Balok Kayu Ulin 10/10 cm - 4.00 m 6 6 Buah- Balok Kayu Ulin 10/10 cm - 2.00 m 64 - 6 58 Buahdalam kubikan 0.1 x 0.1 x 4 x 6 0.24

0.1 x 0.1 x 2 x 58 1.16Total Kubikan Kayu Ulin 10/10 cm 0.24 + 1.16 1.40 meter kubikdlm Batang Kayu Ulin 10/10cm-4.00m 1.4 / ( 0.10 x 0.10 x 4.00 ) 35 batang

3.a. Pekerjaan Membuat Pen dan Lubang SundukVolume Jumlah Tiang Pondasi 64 BuahBahan :- Balok Kayu Ulin 5/7 cm - 50 cm 0.50 x 64 32 meter panjang dalam batang Ulin 5/7 cm -4.00 m 32 / 4.00 8 Buah

: Katingan Jenis Prasarana : Posyandu

Tipe Konstruksi : Bgn Kayu

Ukuran/Dimensi : 6.00 x 8.00 m

Page 16: Rab Posyandu Bhkng

3.c. Pekerjaan Kacapuri/Kalang Balok Kayu Ulin 2 x 5/10 cmVolume- Bangunan Utama 8.00 x 7.00 x 2.00 = 112- Teras Depan 4.00 x 2.00 x 2.00 = 16

Total panjang 128 128.00 meter panjangBahan :- Balok Kayu Ulin 5/10 cm - 4.00 m 128.00 / 4.00 32.00 Buahdalam kubikan 0.05 x 0.10 x 32.00 0.16 meter kubik

Upah :-

4. PEKERJAAN RANGKA BADAN BAWAH4.a. Pekerjaan Suai Kayu Ulin 5/10 cm

Volume- Arah Memanjang 13 x 2 x 4.00 = 104.00- Arah Melintang 9 x 2 x 4.00 = 72.00

Total Panjang = 176.00dalam kubik : 176.00 x 0.05 x 0.10 = 0.88 0.88 meter kubikBahan :- Balok Kayu Ulin 5/10 cm - 4.00 m 1.100 x 0.88 0.97 meter kubik dalam batang 0.97 / 0.05 x 0.10 x 4.00 49 Batang- Paku Ulin/Baut-Mur 6.0000 x 0.88 5.28 Kilogram

Upah :- Pekerja 8.0000 x 0.88 7.04 HOK

4.b. Pekerjaan Memasang Sloof Balok Ulin 10/10 cmVolume : Bangunan Utama 8.00 x 0.10 x 0.10 x 7 0.56

: Bangunan Teras 3.00 x 0.10 x 0.10 x 2 0.060.62 meter kubik

Bahan :- Balok Kayu Ulin 10/10 cm - 4.00 m 1.1000 x 0.62 0.68 meter kubik dalam batang 0.68 / 0.10 x 0.10 x 4.00 17.05 Batang- Paku Ulin 6.0000 x 0.62 3.72 Kilogram

Upah :- Tukang Kayu 24.0000 x 0.62 14.88 HOK- Pekerja 8.0000 x 0.62 4.96 HOK

Page 17: Rab Posyandu Bhkng

4.c. Pekerjaan Memasang Gelagar Balok Kayu Ulin 5/10 cmVolume : Bangunan Utama 8.00 / 0.50 + 1 = 17

: Bangunan Teras 3.00 / 0.50 + 1 = 7 Total panjang bahan = 24

dalam kubik : 24.00 x 0.05 x 0.10 = 0.12 0.12 meter kubikBahan :- Balok Kayu Ulin 5/10 cm - 4.00 m 1.1000 x 0.12 0.13 meter kubik dalam batang 0.13 / 0.05 x 0.10 x 4.00 6.60 Batang- Paku Ulin 6.0000 x 0.12 0.72 Kilogram

Upah :- Tukang Kayu 24.0000 x 0.12 2.88 HOK- Pekerja 8.0000 x 0.12 0.96 HOK

5. PEKERJAAN RANGKA BADAN ATAS5.a. Pekerjaan Tiang Kolom Balok Kayu Ulin 10/10 cm

Volume 0.10 x 0.10 x 4.00 x 10 0.40 meter kubikBahan :- Balok Kayu Ulin 10/10 cm - 4.00 m 1.1000 x 0.40 0.44 meter kubik dalam batang 0.44 / 0.10 x 0.10 x 4.00 11.00 Batang- Paku Ulin 6.0000 x 0.40 2.40 Kilogram

Upah :- Tukang Kayu 24.0000 x 0.40 9.60 HOK

5.b. Pekerjaan Tiang Kolom Balok Kayu Ulin 5/10 cmVolume 0.05 x 0.10 x 4.00 x 18 0.36 meter kubikBahan :- Balok Kayu Ulin 5/10 cm - 4.00 m 1.1000 x 0.36 0.40 meter kubik dalam batang 0.40 / 0.05 x 0.10 x 4.00 19.80 Batang- Paku Ulin 6.0000 x 0.36 2.16 Kilogram

Upah :- Tukang Kayu 24.000 x 0.36 8.64 HOK

5.c. Pekerjaan Tiang Kuzen Pintu/Jendela Balok Kayu Ulin 5/10 cmVolume 0.05 x 0.10 x 4.00 x 24 0.48 meter kubikBahan :- Balok Kayu Ulin 5/10 cm - 4.00 m 1.1000 x 0.48 0.53 meter kubik dalam batang 0.53 / 0.05 x 0.10 x 4.00 26.40 Batang- Paku Ulin 6.0000 x 0.48 2.88 Kilogram

Upah :- Tukang Kayu 24.0000 x 0.48 11.52 HOK

Page 18: Rab Posyandu Bhkng

5.d. Pekerjaan Malangan Kuzen Pintu/jendela Balok Kayu Ulin 5/10 cmVolumePintu P1 : 1 buah 0.05 x 0.10 x 1.82 x 2 0.02Pintu P2 : 3 Buah 0.05 x 0.10 x 0.92 x 6 0.03Pintu P3 : 1 Buah 0.05 x 0.10 x 0.62 x 2 0.01Jendela J1 : 4 Buah 0.05 x 0.10 x 0.72 x 24 0.09Ventilasi V1 : 1 Buah 0.05 x 0.10 x 0.62 x 2 0.01

0.14 meter kubikBahan :- Balok Kayu Ulin 5/10 cm - 4.00 m 1.1000 x 0.14 0.16 meter kubik dalam batang 0.16 / 0.05 x 0.10 x 4.00 7.95 Batang- Paku Ulin 6.0000 x 0.14 0.87 Kilogram

Upah :- Tukang Kayu 24.0000 x 0.14 3.47 HOK

5.e. Pekerjaan Memasang Ringbalk Balok Kayu Ulin 5/10 cmVolume- Arah Memanjang 0.05 x 0.10 x 31.50 = 0.16- Arah Melintang 0.05 x 0.10 x 29.00 = 0.15

= 0.30 0.30 meter kubikBahan :- Balok Kayu Ulin 5/10 cm - 4.00 m 1.1000 x 0.30 0.33 meter kubik dalam batang 0.33 / 0.05 x 0.10 x 4.00 16.64 Batang- Paku Ulin 6.0000 x 0.30 1.82 Kilogram

Upah :- Tukang Kayu 24.0000 x 0.30 7.26 HOK

6. PEKERJAAN RANGKA ATAP6.a. Pekerjaan Kuda-kuda Balok Kayu Lanan 6/12 cm

Volume untuk Bangunan Utama bentang 6.00 m :- Balok Tarik 6/12 cm 0.06 x 0.12 x 6.10 x 1 0.044- Kaki Kuda2 I 6/12 cm 0.06 x 0.12 x 1.82 x 2 0.026- Kaki Kuda2 II 6/12 cm 0.06 x 0.12 x 3.52 x 5 0.127- Balok penyukung 6/12 cm 0.06 x 0.12 x 1.57 x 2 0.023- Tiang Kuda2 6/12 cm 0.06 x 0.12 x 2.51 x 1 0.018- Balok Penjepit 5/10 cm 0.06 x 0.12 x 2.32 x 2 0.033- Balok Penyambung 6/12 cm 0.06 x 0.12 x 1.20 x 1 0.009

Untuk 1 buah kuda-kuda 0.280 meter kubikUntuk 2 Buah Kuda-kuda : 0.280 x 2 0.56 meter kubik

Page 19: Rab Posyandu Bhkng

Volume untuk Teras bentang 3.00 m :- Balok Tarik 6/12 cm 0.06 x 0.12 x 3.10 x 1 0.022- Kaki Kuda2 I 6/12 cm 0.06 x 0.12 x 1.26 x 2 0.018- Kaki Kuda2 II 6/12 cm 0.06 x 0.12 x 1.78 x 2 0.026- Balok penyukung 6/12 cm 0.06 x 0.12 x 0.97 x 2 0.014- Tiang Kuda2 6/12 cm 0.06 x 0.12 x 1.55 x 1 0.011- Balok Penjepit 5/10 cm 0.06 x 0.12 x 1.52 x 2 0.022

Untuk 1 buah kuda-kuda 0.113 meter kubikSambungan kuda-kudaUntuk 2 Buah Kuda-kuda : 0.113 x 2.00 0.23 meter kubikTotal Volume Kuda2 0.56 + 0.23 0.79 meter kubikBalok Ikatan Angin 5/10cm -4.00 m 0.05 x 0.10 x 4.00 x 2 0.04

0.05 x 0.10 x 2.00 x 2 0.02Total bahan 0.79 + 0.04 + 0.02 0.85 meter kubik

Bahan :- Balok Kayu Lanan 6/12 cm - 4.00 m 1.1000 x 0.85 0.93 meter kubik dalam batang 0.93 / 0.06 x 0.12 x 4.00 32.29 Batang- Paku Biasa 3.0000 x 0.85 2.54 Kilogram- Besi Strip/Baut-Mur 15.0000 x 0.85 12.68 Kilogram

Upah :- Tukang Kayu 20.0000 x 0.85 16.91 HOK- Pekerja 6.7000 x 0.85 5.66 HOK

6.b. Pekerjaan Memasang gording Kayu Lanan 6/12 cmVolume Bangunan Utama- Arah Memanjang 0.06 x 0.12 x 55.20 = 0.40- Arah Melintang 0.06 x 0.12 x 26.12 = 0.19

= 0.59 0.59 meter kubikVolume Teras 0.06 x 0.12 x 19.50 = 0.14 0.14 meter kubikTotal Volume Gording 0.59 + 0.14 0.73 meter kubik

Bahan :- Balok Kayu Lanan 6/12 cm - 4.00 m 1.1000 x 0.73 0.80 meter kubik dalam batang 0.80 / 0.06 x 0.12 x 4.00 27.73 Batang- Paku Biasa 2.2000 x 0.73 1.60 Kilogram

Upah :- Tukang Kayu 5.8000 x 0.73 4.21 HOK- Pekerja 1.9400 x 0.73 1.41 HOK

Page 20: Rab Posyandu Bhkng

6.c. Pekerjaan Memasang Kasau & Reng Kayu LananLuas Rangka Atap Bangunan Utama- Arah Memanjang (( 4.45 + 10 ) / 2 ) x 3.55 x 2 51.30- Arah Melintang (( 2 + 8 ) / 2 ) x 3.67 x 2 36.70Luas Atap Anak Bangunan Utama (( 4.45 + 5.85) / 2 ) x 1.85 x 2 19.06Total Luas atap bangunan utama 19.06 - 8.99 10.07 meter kuadrat

Luas Rangka Atap Teras 1.8 x 1 x 2 3.60.85 x 1.5 x 2 2.55

Total Bagian I 6.15 meter kuadrat1/2 x ( 2.30 x 1.80 ) x 2 4.14(( 3.40 + 2.30 ) / 2 ) x 0.85 x 2 4.84

Total Bagian II 8.99 meter kuadrat

Total Luas Rangka Atap Seluruhnya 10.07 + 6.15 + 8.99 25.21 meter kuadrat

Bahan :- Balok Kayu Lanan 0.0120 x 25.21 0.30 meter kubik- Paku Biasa 0.1500 x 25.21 3.78 Kilogram

Upah :- Tukang Kayu 0.1000 x 25.21 2.52 HOK- Pekerja 0.1000 x 25.21 2.52 HOK

6.d. Pekerjaan Memasang Lisplank Kayu Ulin 2/20 cmVolume : Lisplank 2/20 cm ( 8.00 + 10.00 + 8.00 + 2.50 + 3.00 + 2.50 ) 34

1.8 + 1.9 x 2 7.401.8 + 1.9 x 2 7.40

Total Panjang Lispank 34 + 7.4000 + 7.40 48.80 meter panjang

Bahan :- Papan Ulin 0.0090 x 48.80 0.44 meter kubik dalam batang 0.44 / 0.02 x 0.20 x 4.00 27.45 Keping- Paku Ulin 0.0500 x 48.80 2.44 Kilogram

Upah :- Tukang Kayu 0.2200 x 48.80 10.74 HOK- Pekerja 0.1100 x 48.80 5.37 HOK

Volume : Lisplank 2/20 cmVolume : Lisplank 2/10 cm

Page 21: Rab Posyandu Bhkng

6.e. Pekerjaan Memasang Penutup Atap Genteng MetalLuas Atap = Luas Rangka Atap 25.21 meter kuadratBahan :- Genteng Metal 0.35 mm 1.0200 x 25.21 25.71 meter kuadrat- Paku anti karat 0.0750 x 25.21 1.89 Kilogram

Upah :- Tukang Kayu 0.1500 x 25.21 3.78 HOK- Pekerja 0.2500 x 25.21 6.30 HOK

6.f. Pekerjaan Memasang Nok Atap Genteng MetalVolume 6.80 + 5.90 + 14.4 27.10 meter panjangBahan :- Bubungan Metal 1.0000 x 27.10 27.10 meter panjang- Paku anti karat 0.0075 x 8.00 0.06 Kilogram

Upah :

6.g. Pekerjaan Pasang Talang Miring Seng BJLS 28Volume 3.60 + 3.60 7.20 meter panjangBahan :- Seng Plat 3" x 6" BJLS 28 0.5000 x 7.20 3.60 Lembar- Paku anti karat 0.0150 x 7.20 0.11 Kilogram- Papan Lanan 0.019 x 7.20 0.14 meter kubik

Upah :- Tukang Kayu 0.4000 x 7.20 2.88 HOK

7. PEKERJAAN LANTAI dan DINDING 7.a. Pekerjaan Memasang Lantai Kayu Ulin

Volume- Luas Lantai Bangunan Utama 6.00 x 8.00 = 48- Luas Lantai Teras 1.50 x 3.00 = 4.5Total Luas Lantai 52.5 52.50 meter kuadratBahan :- Papan Kayu Ulin 2/18 cm-4.00m 0.0233 x 52.50 1.22 meter kubik dalam batang 1.22 / 0.02 x 0.18 x 4.00 84.95 Keping- Paku Ulin 0.2000 x 52.50 10.50 Kilogram

Upah :- Tukang Kayu 1.8000 x 52.50 94.50 HOK

Page 22: Rab Posyandu Bhkng

7.b. Pekerjaan Memasang Dinding Kayu UlinVolumeLuas Dinding Kayu Ulin 0.90 x 25.30 22.77 meter kuadratBahan :- Papan Kayu Ulin 2/18 cm-4.00m 0.0230 x 22.77 0.52 meter kubik dalam batang 0.52 / 0.02 x 0.18 x 4.00 36.37 Keping- Paku Ulin 0.2000 x 22.77 4.55 Kilogram

Upah :- Tukang Kayu 1.8000 x 22.77 40.99 HOK

7.c. Pekerjaan Memasang Dinding Kayu LananVolumeLuas Dinding Kayu Lanan 3.50 x 41.50 = 145.25 145.25 meter kuadratLuas : P1 2.55 x 1.8 x 1 = 4.59

P2 2.55 x 0.9 x 3 = 6.89P3 2.25 x 0.6 x 1 = 1.35J1 1.65 x 1.45 x 4 = 9.57V1 0.40 x 0.60 x 1 = 0.24

Total Luas Pintu/Jendela & Ventilasi = 22.63Total Luas dinding Kayu Lanan 145.25 - 22.77 - 22.63 99.85 meter kuadratBahan :- Papan Kayu Lanan 2/18 cm-4.00m 0.0230 x 99.85 2.30 meter kubik dalam batang 2.30 / 0.02 x 0.18 x 4.00 159.47 Keping- Paku Kayu 0.2000 x 99.85 19.97 Kilogram

Upah :- Tukang Kayu 1.8000 x 99.85 179.72 HOK

7.d. Memasang Dinding Tawing Layar Kayu LananVolumeLuas Dinding Tawing Layar (( 1.60 + 3.10 ) / 2 ) x 0.76 = 1.79

(1/2 x 1.60 x 0.84 ) x 2 = 1.34Total Luas Dinding Tawing Layar 3.13 3.13 meter kuadratBahan :- Papan Kayu Lanan 2/18 cm-4.00m 0.0230 x 3.13 0.07 meter kubik dalam batang 0.07 / 0.02 x 0.18 x 4.00 5.00 Keping- Paku Kayu 0.2000 x 3.13 0.63 Kilogram

Upah :- Tukang Kayu 1.8000 x 3.13 5.63 HOK- Pekerja 0.6000 x 3.13 1.88 HOK

Page 23: Rab Posyandu Bhkng

PEKERJAAN DAUN PINTU/JENDELA dan VENTILASI8.a. Pekerjaan Memasang Daun Pintu Kaca Kayu Ulin

Volume- Daun pintu P1 & P2 0.90 x 2.10 x 3 5.67 meter kuadratBahan :- Papan Kayu Uin 0.0350 x 5.67 0.20 meter kubik dalam batang 0.20 / 0.02 x 0.18 x 4.00 13.78 Keping

Upah :- Tukang Kayu 2.0000 x 5.67 11.34 HOK- Pekerja 0.0500 x 5.67 0.28 HOK

8. 8.b. Pekerjaan Memasang Daun Pintu Panil Kayu LananVolume- Daun pintu P2 0.90 x 2.10 x 2 = 3.78- Daun pintu P3 0.60 x 1.80 x 1 = 1.08

Total Daun Pintu = 4.86 4.86 meter kuadratBahan :- Papan Kayu Lanan 0.0400 x 4.86 0.19 meter kubik dalam batang 0.19 / 0.02 x 0.18 x 4.00 13.50 Keping

Upah :- Tukang Kayu 2.5000 x 4.86 12.15 HOK- Pekerja 1.0000 x 4.86 4.86 HOK

8.c. Pekerjaan Memasang Daun Jendela Kaca Kayu Ulin & VentilasiVolume- Daun Jendela J1 0.70 x 1.20 x 8 = 6.72- Ventilasi P1 0.40 x 1.80 x 1 = 0.72- Ventilasi P2 0.40 x 0.90 x 3 = 1.08- Ventilasi P3 0.40 x 0.60 x 1 = 0.24- Ventilasi J1 0.40 x 0.70 x 8 = 2.24- Ventilasi V1 0.40 x 0.60 x 1 = 0.24

Total Daun Jendela & Ventilasi = 11.24 11.24 meter kuadrat

Bahan :- Papan Kayu Uin 0.0350 x 11.24 0.39 meter kubik dalam batang 0.39 / 0.02 x 0.18 x 4.00 27.32 Keping

Upah :- Tukang Kayu 2.0000 x 11.24 22.48 HOK- Pekerja 0.8000 x 11.24 8.99 HOK

Page 24: Rab Posyandu Bhkng

8.d. Pekerjaan Memasang Kaca tebal 5 mmVolume - Luas bidang Kaca P1 : 0.90 x 2.10 x 2 = 3.78

P2 : 0.90 x 2.10 x 1 = 1.89 J1 : 0.70 x 1.20 x 8 = 6.72

- Ventilasi P1 0.40 x 1.80 x 1 = 0.72- Ventilasi P2 0.40 x 0.90 x 3 = 1.08- Ventilasi P3 0.40 x 0.60 x 1 = 0.24- Ventilasi J1 0.40 x 0.70 x 8 = 2.24- Ventilasi V1 0.40 x 0.60 x 1 = 0.24

Total Luas Bidang Kaca = 16.91 16.91 meter kuadratBahan :- Kaca tebal 5 mm 1.1000 x 16.91 18.60 meter kuadrat

Upah :- Tukang Kayu 0.1500 x 16.91 2.54 HOK- Pekerja 0.0150 x 16.91 0.25 HOK

9. PEKERJAAN PLAFOND9.a. Pekerjaan Memasang Rangka Plafond

Volume - Luas bangunan 8.00 x 6.00 + 1.50 x 3.00 52.5- Luar Tepi Bangunan/Surau 0.80 x 35.00 28.00

80.50 meter kuadratBahan :- Balok Kayu Lanan 0.0120 x 80.50 0.97 meter kubik- Paku Biasa 2"-5" 0.1000 x 80.50 8.05 Kilogram

Upah :- Tukang Kayu 0.2500 x 80.50 20.13 HOK- Pekerja 0.1500 x 80.50 12.08 HOK

9.b. Pekerjaan Memasang Penutup Plafond Flaywood 60 x 120 cm tebal : 3 mmVolume- Luas bidang Rangka plafond 80.50 80.50 meter kuadratBahan :- Playwood tebal 3 mm 0.3750 x 80.50 30.19 Lembar- Paku Playwood 0.0300 x 80.50 2.42 Kilogram

Upah :- Tukang Kayu 0.1000 x 80.50 8.05 HOK- Pekerja 0.0700 x 80.50 5.64 HOK

Page 25: Rab Posyandu Bhkng

9.c. Pekerjaan Memasang List Frofil PlafondVolumePanjang List profil 4 cm 10+(8x4)+(6X4)+(2.50x14)+5+(3x4)+(1.50x8)+(2x2) 134 meter panjangBahan :- Kayu Profil 1.0500 x 134.00 140.70 meter panjang- Paku 0.0100 x 134.00 1.34 Kilogram

Upah :- Pekerja 0.0210 x 134.00 2.81 HOK

10. PEKERJAAN PENGECATAN 10a. Pekerjaan Mengecat Dinding Kayu Luar/dalam & Tawing Layar

Volume :- Luas Dinding 22.77 + 99.85 + 3.13 = 125.74bagian luar dalam termasuk kamar : 125.74 x 2 127.74 meter kuadratBahan :- Plamir 0.1000 x 127.74 12.77 Kilogram- Cat Dasar 0.1000 x 127.74 12.77 Kilogram- Cat Penutup 0.2600 x 127.74 33.21 Kilogram

Upah :- Pekerja 0.0200 x 127.74 2.55 HOK

10.b. Pekerjaan Mendempul dan Menggosok bidang kayuVolume- Luas P1 : Malangan : 0.25 x 1.80 x 2 = 0.90 Tiang Pintu : 0.25 x 2.60 x 2 = 1.30

= 2.20- Luas P2 : Malangan : 0.25 x 0.90 x 6 = 1.35 Tiang Pintu : 0.25 x 2.60 x 6 = 3.90

= 5.25- Luas P3 : Malangan : 0.25 x 0.60 x 2 = 0.30 Tiang Pintu : 0.25 x 2.30 x 2 = 1.15

= 1.45- Luas J1 : Malangan : 0.25 x 0.70 x 24 = 4.20 Tiang Jendela : 0.25 x 1.70 x 12 = 5.10

= 9.30- Luas V1 : Malangan : 0.25 x 0.60 x 2 = 0.30 Tiang Ventilasi : 0.25 x 0.55 x 2 = 0.28

= 0.58

Page 26: Rab Posyandu Bhkng

- Luas daun Pintu P2 : 0.90 x 2.10 x 4 = 7.56- Luas daun Pintu P3 : 0.60 x 1.80 x 2 = 2.16- Luas Profil plafond : 0.04 x 140.70 = 5.63Total Luas Bidang yang didempul (2.20+5.25+1.45+9.30+0.58+7.56+2.16+5.63) 23.27 meter kuadrat

Bahan :- Dempul Jadi 0.0800 x 23.27 1.86 Kilogram- Minyak Cat 0.0200 x 23.27 0.47 Kilogram- Batu Apung/Ampelas 0.0100 x 23.27 0.23 Kilogram

Upah :- Pekerja 0.0400 x 23.27 0.93 HOK

10.c. Pekerjaan Mengecat bidang kuzen/malangan, daun Pintu/Jendela & VentilasiVolume - Luas bidang : 23.27 23.27 meter kuadratBahan :- Cat Menie 0.2000 x 23.27 4.65 Kilogram- Plamir 0.1500 x 23.27 3.49 Kilogram- Cat Dasar 0.1700 x 23.27 3.96 Kilogram- Cat Penutup 0.2600 x 23.27 6.05 Kilogram

Upah :- Pekerja 0.0700 x 23.27 1.63 HOK

10.d. Pekerjaan Mengecat Penutup PlafondVolume- Luas plafond 80.50 80.50 meter kuadratBahan :- Plamir 0.1000 x 80.50 8.05 Kilogram- Cat Dasar 0.1000 x 80.50 8.05 Kilogram- Cat Penutup 0.2600 x 80.50 20.93 Kilogram

Upah :- Pekerja 0.0200 x 80.50 1.61 HOK

10.e. Pekerjaan Mengecat Lisplank 2/10 cm dan 2/20 cmVolume- Luas 0.02 + 0.2 + 0.2 x 48.80 20.50 meter kuadratBahan :- Cat Menie 0.2000 x 20.50 4.10 Kilogram- Plamir 0.1500 x 20.50 3.07 Kilogram- Cat Dasar 0.1700 x 20.50 3.48 Kilogram- Cat Penutup 0.2600 x 20.50 5.33 Kilogram

Upah :- Pekerja 0.0700 x 20.50 1.43 HOK

Page 27: Rab Posyandu Bhkng

10.f. Pekerjaan Mengeter Kuda-kuda, Gording dan Kasau/Reng Kayu LananVolume- Luas ( 0.36 x ( 129.15 + 110.90 )) + 25.21 111.62 meter kuadratBahan :- Ter atau Residu 0.3500 x 111.62 39.07 Liter

Upah :- Pekerja 0.1000 x 111.62 11.16 HOK

11. PEKERJAAN SANITASI11.a. Pekerjaan Memasang Closet Jongkok

Volume- Jumlah 1 1.00 BuahBahan :- Closet Jongkok Merk TERASSO 1.0000 x 1 1.00 Buah- Batu Bata 5 x 11 x 22 cm 7.0000 x 1 7.00 Buah- Semen PC 6.0000 x 1 6.00 Kilogram- Pasir Pasang 0.0100 x 1 0.01 meter kubik

Upah :- Tukang Batu 1.5000 x 1 1.50 HOK

11.b.Volume- Jumlah 1 1.00 BuahBahan :- Bak Mandi Merk TERASO 1.0000 x 1 1.00 Buah- Semen PC 6.0000 x 1 6.00 Kilogram- Pasir Pasang 0.0100 x 1 0.01 meter kubik

Upah :- Tukang Batu 0.7500 x 1 0.75 HOK

Catatn Bahan lain yang dibutuhkan :

1 1.00 Buah1 1.00 Buah

12. PEKERJAAN KUNCI12.a. Pekerjaan Memasang Kunci Tanam Biasa

Volume- Jumlah Pintu P1, P2 & P3 5 5.00 BuahBahan :- Kunci Tanam Biasa 1.0000 x 5 5.00 Buah

Upah :- Tukang Kayu 0.5000 x 5 2.50 HOK

Memasang Bak Mandi dengan Volume 0.30 m³

- Pipa PVC Ø 4"- Pipa PVC Ø 2"

Page 28: Rab Posyandu Bhkng

12.b. Pekerjaan Memasang Engsel PintuVolume- Jumlah Pintu P1, P2 & P3 5.00 x 3.00 15.00 BuahBahan :- Engsel Pintu 1.0000 x 15 15.00 Buah

Upah :- Tukang Kayu 0.1500 x 15 2.25 HOK

12.c. Pekerjaan Memasang Engsel JendelaVolumeJumlah Daun Jendela J1 4 x 4 16.00 BuahBahan :- Engsel kupu-kupu 1.0000 x 16 16.00 Buah

Upah :- Tukang Kayu 0.1000 x 16 1.60 HOK

Tanggal Survey : Halaman :13

Dibuat Oleh :

Page 29: Rab Posyandu Bhkng

RENCANA ANGGARAN BIAYA PRASARANA

Provinsi : Kalimantan Tengah No. Rab : Kabupaten : Katingan Kegiatan : Prasarana KesehatanKecamatan : Bukit Raya Jenis Kegiatan : PosyanduKelurahan : Rangan Bahekang Tipe Konstruksi : Bangunan Kayu

Ukuran/Dimensi : 6.00 x 8.00 meter

URAIAN

Volume

SatuanTotal

1 BAHAN1 Balok Kayu Ulin 10/10 cm - 4.00 m 63.00 63 Btg I.a Rp. 90,000- Rp - Rp. 5,670,000- 2 Balok Kayu Ulin 5/10 cm - 4.00 m 134.00 134.00 Btg I.a Rp. 60,000- Rp - Rp. 8,040,000- 3 Balok Kayu Ulin 5/7 cm - 4.00 m 8.00 8.00 Btg I.a Rp. 40,000- Rp - Rp. 320,000- 4 Papan Kayu Ulin 2/20 cm - 4.00 m 174.00 174.00 Kpg I.a Rp. 60,000- Rp - Rp. 10,440,000- 5 Balok Kayu Lanan 6/12 cm - 4.00 m 60.00 60.00 Btg I.a Rp. 30,000- Rp - Rp. 1,800,000- 6 Balok Kayu Lanan 5/7 cm - 4.00 m 22.00 22.00 Btg I.a Rp. 25,000- Rp - Rp. 550,000- 7 Balok Kayu Lanan 5/5 cm - 4.00 m 97.00 97.00 Btg I.a Rp. 15,000- Rp - Rp. 1,455,000- 8 Balok 5/7 cm - 4.00 m Ky Lanan Klas III - 4.00 m 34.00 34.00 Btg I.a Rp. 15,000- Rp - Rp. 510,000- 9 Papan 2/20 cm - 4.00 m Ky Lanan Klas III - 4.00 m 17.00 17.00 Kpg I.a Rp. 25,000- Rp - Rp. 425,000-

10 Reng Kayu Lanan 3/5 cm - 4.00 m 51.00 51.00 Btg I.a Rp. 10,000- Rp - Rp. 510,000- 11 Papan Kayu Lanan 2/20 cm - 4.00 m 169.00 169.00 Kpg I.a Rp. 25,000- Rp - Rp. 4,225,000- 12 Atap Multiroof 210.00 210.00 m² I.b Rp. 95,000- Rp - Rp. 19,950,000- 13 Bubungan Metal 27.00 27.00 m' I.b Rp. 30,000- Rp - Rp. 810,000- 14 Seng Plat BJLS 28 4.00 4.00 Lbr I.b Rp. 60,000- Rp - Rp. 240,000- 15 Playwood 3 mm 30.00 30.00 Lbr I.b Rp. 65,000- Rp - Rp. 1,950,000- 16 List Profil Plafond 141.00 141.00 m' I.a Rp. 20,100- Rp - Rp. 2,834,100- 17 Besi Strip/Baut-Mur 17.00 17.00 kg I.b Rp. 45,000- Rp - Rp. 765,000- 18 Paku Biasa 2"-5" 39.00 39.00 kg I.b Rp. 30,000- Rp - Rp. 1,170,000- 19 Paku Ulin 2"-5" 32.00 32.00 kg I.b Rp. 50,000- Rp - Rp. 1,600,000- 20 Paku Anti Karat 2.00 2.00 kg I.b Rp. 50,000- Rp - Rp. 100,000- 21 Paku Playwood 2.50 2.50 kg I.b Rp. 65,000- Rp - Rp. 162,500- 22 Kaca Bening 5 mm 19.00 19.00 m² I.b Rp. 150,000- Rp - Rp. 2,850,000- 23 Plamir 19.50 19.50 kg I.b Rp. 25,000- Rp - Rp. 487,500- 24 Cat Menie 9.00 9.00 kg I.b Rp. 30,000- Rp - Rp. 270,000- 25 Cat Dasar 28.00 28.00 kg I.b Rp. 25,000- Rp - Rp. 700,000- 26 Cat Penutup merk PLATON 66.00 66.00 kg I.b Rp. 60,000- Rp - Rp. 3,960,000- 27 Minyak Cat 0.50 0.50 kg I.b Rp. 25,000- Rp - Rp. 7,700- 28 Dempul 2.00 2.00 kg I.b Rp. 15,000- Rp - Rp. 30,000- 29 Batu Arang/Ampelas 0.50 0.50 kg I.b Rp. 2,500- Rp - Rp. 1,250- 30 Ter/Residu 39.00 39.00 kg I.b Rp. 10,000- Rp - Rp. 390,000- 31 Closet Jongkok merk TERASSO 1.00 1.00 bh I.b Rp. 150,000- Rp - Rp. 150,000- 32 Bak Mandi merk TERASSO 1 1.00 bh I.b Rp. 200,000- Rp - Rp. 200,000- 33 Pipa PVC Ø 4" 1 1.00 bh I.b Rp. 180,000- Rp - Rp. 180,000- 34 Pipa PVC Ø 2" 1 1.00 bh I.b Rp. 70,000- Rp - Rp. 70,000- 35 Batu Bata Merah 5 x 11 x 22 cm 7 7.00 bh I.a Rp. 2,000- Rp - Rp. 14,000- 36 Pasir Pasang 0.02 0.02 m³ I.a Rp. 200,000- Rp - Rp. 4,000- 37 Semen PC 12 12.00 kg I.b Rp. 150,000- Rp - Rp. 1,800,000- 38 Kunci Tanam Biasa 5 5.00 set I.b Rp. 150,000- Rp - Rp. 750,000- 39 Engsel Pintu 15 15.00 set I.b Rp. 20,000- Rp - Rp. 300,000- 40 Engsel Jendela Kupu-kupu 16 16.00 set I.b Rp. 15,000- Rp - Rp. 240,000- 41 SeptickTank 1 1.00 unit I.a Rp. 3,000,000- Rp - Rp. 3,000,000-

Sub Total 1) Rp - Rp. 78,931,050-

2 ALAT1 Cangkul 4 4 bh II.a Rp. 45,000- Rp. 180,000- Rp - 2 Sekop 2 2 bh II.a Rp. 46,000- Rp. 92,000- Rp - 3 Linggis 2 2 bh II.a Rp. 50,000- Rp. 100,000- Rp - 4 gergaji 4 4 bh II.a Rp. 50,000- Rp. 200,000- Rp - 5 Pahat 4 4 bh II.a Rp. 25,000- Rp. 100,000- Rp - 6 Ketam 1 1 Set II.b Rp. 350,000- Rp. 350,000- Rp - 7 Bor 1 1 Set II.b Rp. 250,000- Rp. 250,000- Rp - 8 Waterpass 1 1 bh II.b Rp. 45,000- Rp. 45,000- Rp - 9 Selang Waterpass 30 30 m' II.b Rp. 6,000- Rp. 180,000- Rp -

10 Meteran 2 2 bh II.b Rp. 20,000- Rp. 40,000- Rp - 11 Benang 4 4 roll II.b Rp. 5,000- Rp. 20,000- Rp - 12 Genset 1 1 unit II.b Rp. 400,000- Rp. 400,000- Rp - 13 Palu 4 4 bh II.b Rp. 45,000- Rp. 180,000- Rp - 14 Batu Asah 1 1 set II.b Rp. 95,000- Rp. 95,000- Rp - 15 Kikir 1 1 set II.b Rp. 67,250- Rp. 67,250- Rp - 16 Cetok 1 1 set II.b Rp. 80,000- Rp. 80,000- Rp - 17 Papan Proyek 1 1 Buah II.c Rp. 200,000- Rp. 200,000- Rp -

Sub Total 2) Rp. 2,579,250- Rp -

Kategori Biaya

Harga Satuan ( Rp )

Jumlah Swadaya ( Rp )

Jumlah PNPM ( Rp )Dari

SwadayaDari PNPM-MP

Page 30: Rab Posyandu Bhkng

3 UPAH1 0 60 60 HOK III.a Rp. 90,000- Rp - Rp. 5,400,000- 3 0 150 150 HOK III.a Rp. 70,000- Rp - Rp. 10,500,000-

Sub Total 3) Rp - Rp. 15,900,000-

Total Biaya (PNPM MP + Swadaya) Rp. 97,410,300-

Sumber DanaTotal Biaya PNPM MP Rp. 94,831,050-

Total Biaya Swadaya Rp. 2,579,250-

Catatan :

Sumbangan lahan tidak dimasukkan RAB tetapi dilaporkan dengan form. 6a, 6b dan 6c

Sumbangan dalam bentuk bahan upah dan alat, ditulis dalam kolom Volume dari Swadaya

Operasional TPK dilaporkan pada form Rekapitulasi

Kategori Biaya

I-a Pembelian bahan hasil tenaga manusia

I-b Pembelian bahan hasil industri

II-a Pembelian alat tanganII-b Pembelian / penyewaan alat mesin

III-a Pembayaran tenaga kerja untuk konstruksiIII-b Pembayaran tenaga untuk pengumpulan bahan

Diketahui Oleh : Diperiksa Oleh : Dibuat Oleh : PjOK Kec. Bukit Raya FT Kec. Bukit Raya Ketua TPK Penda Nange

( EBIT THEOPILUS, SH. ) ( YUPARNADI, Amd. ) ………………………………………..

Page 31: Rab Posyandu Bhkng

RENCANA ANGGARAN BIAYA SUMBER DANA DARI SWADAYA MASYARAKAT

Propinsi : Kalimantan Tengah No. Rab : Kabupaten : Kotawaringin Timur Kegiatan : Prasarana KesehatanKecamatan : Mentaya Hulu Jenis Kegiatan : PosyanduDesa : Rangan Bahekang Tipe Konstruksi : Bangunan Kayu

Ukuran/Dimensi : 6.00 x 8.00 meter

URAIANVOLUME Harga Nilai Swadaya Nilai Swadaya Jumlah

Total Volume Volume Swadaya Swadaya Satuan Satuan Selain Uang TotalVolume PNPM-MP Swadaya Selain Uang Uang ( RP ) Uang RP. RP ( RP )

a b = a - c c = d + e d e f g h = d x g I = e x g j = h + iA. BAHAN

1 Balok Kayu Ulin 10/10 cm - 4.00 m 63.00 63.00 0 0 0 Btg Rp. 90,000- Rp - Rp - Rp - 2 Balok Kayu Ulin 5/10 cm - 4.00 m 134.00 134.00 0 0 0 Btg Rp. 60,000- Rp - Rp - Rp - 3 Balok Kayu Ulin 5/7 cm - 4.00 m 8.00 8.00 0 0 0 Btg Rp. 40,000- Rp - Rp - Rp - 4 Papan Kayu Ulin 2/20 cm - 4.00 m 174.00 174.00 0 0 0 Kpg Rp. 60,000- Rp - Rp - Rp - 5 Balok Kayu Lanan 6/12 cm - 4.00 m 60.00 60.00 0 0 0 Btg Rp. 30,000- Rp - Rp - Rp - 6 Balok Kayu Lanan 5/7 cm - 4.00 m 22.00 22.00 0 0 0 Btg Rp. 25,000- Rp - Rp - Rp - 7 Balok Kayu Lanan 5/5 cm - 4.00 m 97.00 97.00 0 0 0 Btg Rp. 15,000- Rp - Rp - Rp - 8 Balok 5/7 cm - 4.00 m Ky Lanan Klas III - 4.00 m 34.00 34.00 0 0 0 Btg Rp. 15,000- Rp - Rp - Rp - 9 Papan 2/20 cm - 4.00 m Ky Lanan Klas III - 4.00 m 17.00 17.00 0 0 0 Kpg Rp. 25,000- Rp - Rp - Rp -

10 Reng Kayu Lanan 3/5 cm - 4.00 m 51.00 51.00 0 0 0 Btg Rp. 10,000- Rp - Rp - Rp - 11 Papan Kayu Lanan 2/20 cm - 4.00 m 169.00 169.00 0 0 0 Kpg Rp. 25,000- Rp - Rp - Rp - 12 Atap Multiroof 210.00 210.00 0 0 0 m² Rp. 95,000- Rp - Rp - Rp - 13 Bubungan Metal 27.00 27.00 0 0 0 m' Rp. 30,000- Rp - Rp - Rp - 14 Seng Plat BJLS 28 4.00 4.00 0 0 0 Lbr Rp. 60,000- Rp - Rp - Rp - 15 Playwood 3 mm 30.00 30.00 0 0 0 Lbr Rp. 65,000- Rp - Rp - Rp - 16 List Profil Plafond 141.00 141.00 0 0 0 m' Rp. 20,100- Rp - Rp - Rp - 17 Besi Strip/Baut-Mur 17.00 17.00 0 0 0 kg Rp. 45,000- Rp - Rp - Rp - 18 Paku Biasa 2"-5" 39.00 39.00 0 0 0 kg Rp. 30,000- Rp - Rp - Rp - 19 Paku Ulin 2"-5" 32.00 32.00 0 0 0 kg Rp. 50,000- Rp - Rp - Rp - 20 Paku Anti Karat 2.00 2.00 0 0 0 kg Rp. 50,000- Rp - Rp - Rp - 21 Paku Playwood 2.50 2.50 0 0 0 kg Rp. 65,000- Rp - Rp - Rp - 22 Kaca Bening 5 mm 19.00 19.00 0 0 0 m² Rp. 150,000- Rp - Rp - Rp - 23 Plamir 19.50 19.50 0 0 0 kg Rp. 25,000- Rp - Rp - Rp - 24 Cat Menie 9.00 9.00 0 0 0 kg Rp. 30,000- Rp - Rp - Rp - 25 Cat Dasar 28.00 28.00 0 0 0 kg Rp. 25,000- Rp - Rp - Rp - 26 Cat Penutup merk PLATON 66.00 66.00 0 0 0 kg Rp. 60,000- Rp - Rp - Rp - 27 Minyak Cat 0.50 0.50 0 0 0 kg Rp. 25,000- Rp - Rp - Rp - 28 Dempul 2.00 2.00 0 0 0 kg Rp. 15,000- Rp - Rp - Rp - 29 Batu Arang/Ampelas 0.50 0.50 0 0 0 kg Rp. 2,500- Rp - Rp - Rp - 30 Ter/Residu 39.00 39.00 0 0 0 kg Rp. 10,000- Rp - Rp - Rp - 31 Closet Jongkok merk TERASSO 1.00 1.00 0 0 0 bh Rp. 150,000- Rp - Rp - Rp - 32 Bak Mandi merk TERASSO 1.00 1.00 0 0 0 bh Rp. 200,000- Rp - Rp - Rp - 33 Pipa PVC Ø 4" 1.00 1.00 0 0 0 bh Rp. 180,000- Rp - Rp - Rp - 34 Pipa PVC Ø 2" 1.00 1.00 0 0 0 bh Rp. 70,000- Rp - Rp - Rp - 35 Batu Bata Merah 5 x 11 x 22 cm 7.00 7.00 0 0 0 bh Rp. 2,000- Rp - Rp - Rp - 36 Pasir Pasang 0.02 0.02 0 0 0 m³ Rp. 200,000- Rp - Rp - Rp - 37 Semen PC 12.00 12.00 0 0 0 kg Rp. 150,000- Rp - Rp - Rp - 38 Kunci Tanam Biasa 5.00 5.00 0 0 0 set Rp. 150,000- Rp - Rp - Rp - 39 Engsel Pintu 15.00 15.00 0 0 0 set Rp. 20,000- Rp - Rp - Rp -

Page 32: Rab Posyandu Bhkng

40 Engsel Jendela Kupu-kupu 16.00 16.00 0 0 0 set Rp. 15,000- Rp - Rp - Rp - 41 SeptickTank 1.00 1.00 0 0 0 unit Rp. 3,000,000- Rp - Rp - Rp -

Sub Total 1 ) Rp - Rp - Rp -

Page 33: Rab Posyandu Bhkng

B. ALAT1 Cangkul 4 0 4 4 0 bh Rp. 45,000- Rp. 180,000- Rp - Rp. 180,000- 2 Sekop 2 0 2 2 0 bh Rp. 46,000- Rp. 92,000- Rp - Rp. 92,000- 3 Linggis 2 0 2 2 0 bh Rp. 50,000- Rp. 100,000- Rp - Rp. 100,000- 4 gergaji 4 0 4 4 0 bh Rp. 50,000- Rp. 200,000- Rp - Rp. 200,000- 5 Pahat 4 0 4 4 0 bh Rp. 25,000- Rp. 100,000- Rp - Rp. 100,000- 6 Ketam 1 0 1 1 0 Set Rp. 350,000- Rp. 350,000- Rp - Rp. 350,000- 7 Bor 1 0 1 1 0 Set Rp. 250,000- Rp. 250,000- Rp - Rp. 250,000- 8 Waterpass 1 0 1 1 0 bh Rp. 45,000- Rp. 45,000- Rp - Rp. 45,000- 9 Selang Waterpass 30 0 30 30 0 m' Rp. 6,000- Rp. 180,000- Rp - Rp. 180,000-

10 Meteran 2 0 2 2 0 bh Rp. 20,000- Rp. 40,000- Rp - Rp. 40,000- 11 Benang 4 0 4 4 0 roll Rp. 5,000- Rp. 20,000- Rp - Rp. 20,000- 12 Genset 1 0 1 1 0 unit Rp. 400,000- Rp. 400,000- Rp - Rp. 400,000- 13 Palu 4 0 4 4 0 bh Rp. 45,000- Rp. 180,000- Rp - Rp. 180,000- 14 Batu Asah 1 0 1 1 0 set Rp. 95,000- Rp. 95,000- Rp - Rp. 95,000- 15 Kikir 1 0 1 1 0 set Rp. 67,250- Rp. 67,250- Rp - Rp. 67,250- 16 Cetok 1 0 1 1 0 set Rp. 80,000- Rp. 80,000- Rp - Rp. 80,000- 17 Papan Proyek 1 0 1 1 0 Buah Rp. 200,000- Rp. 200,000- Rp - Rp. 200,000-

Sub Total 2 ) Rp. 1,222,000- Rp - Rp. 2,579,250- C. UPAH

1 0 0.00 0.00 0 0 0 HOK Rp. 90,000- Rp - Rp - Rp - 2 0 60.00 60.00 0 0 0 HOK Rp. 90,000- Rp - Rp - Rp - 3 #REF! #REF! #REF! #REF! #REF! 0 #REF! #REF! #REF! #REF! #REF!4 0 0.00 0.00 0 0 0 HOK #REF! #REF! #REF! #REF!5 0 150.00 150.00 0 0 0 HOK Rp. 70,000- Rp - Rp - Rp -

Sub Total 3 ) #REF! #REF! #REF!TOTAL BIAYA SWADAYA #REF!

Sumber DanaSwadaya Selain Uang #REF!

Swadaya Uang #REF!

Kuala Kuayan, …….. Oktuber 2009Diketahui Oleh : Diperiksa Oleh : Dibuat Oleh :

PjOK Kec. Bukit Raya FT Kec. Bukit Raya Ketua TPK Penda Nange

( EBIT THEOPILUS, SH. ) ( YUPARNADI, Amd. ) ………………………………………..0

Page 34: Rab Posyandu Bhkng

Form.8.b

REKAPITULASI ANGGARAN BIAYA PRASARANAPropinsi : Kalteng No. : Kabupaten : Kotim program : PNPM-MP TA. 2008Kecamatan : Mentaya Hulu Kegiatan : Prasarana KesehatanDesa : Rangan Bahekang Jenis Kegiatan : Posyandu

NO URAIAN

Tipe Kostruksi : Bangunan Kayu

Bobot%

Tipe Kostruksi

Bobot%

Kegiatan

Bobot% JUMLAH TOTAL Bobot%Ukuran : 6.00 x 8.00 meter Ukuran UkuranJumlah : 1 Unit Jumlah JumlahNo. RAB : No. RAB : No. RAB

PNPM Swadaya PNPM Swadaya PNPM Swadaya PNPM Swadaya

I Rp. 78,931,050- Rp - 80 Rp. 78,931,050- Rp - 80

II Rp - Rp. 2,579,250- 0 Rp - Rp. 2,579,250- 0

III Rp. 15,900,000- #REF! 16 Rp. 15,900,000- #REF! 16

Jumlah Rp. 94,831,050- #REF! 96 Rp. 94,831,050- #REF! 96IV Operasional UPK 2% Rp. 1,432,600- 1 Rp. 1,432,600- 1V Operasional TPK 3% Rp. 2,149,000- 2 Rp. 2,149,000- 2

Jumlah Total Rp. 98,412,650- #REF! 100 Rp. 98,412,650- #REF! 100Jumlah Biaya Upah Rp. 15,900,000- #REF! Rp. 15,900,000- #REF!Jumlah HOK Konstruksi #REF! 0 HOK HOK #REF! 0 HOK

Kuala Kuayan, …….. Oktuber 2009Diketahui Oleh : Diperiksa Oleh : Dibuat Oleh :

PjOK Kec. Bukit Raya FT Kec. Bukit Raya Ketua TPK Penda Nange

( EBIT THEOPILUS, SH. ) ( YUPARNADI, Amd. ) ………………………………………..0

Catatan : kolom swadaya diisi nilai swadaya dalam bentuk uang

BAHAN (Tidak perlu dirinci)

PERALATAN (Tidak perlu dirinci)

UPAH (Tidak perlu dirinci)