  • REKAPITULASI

    R E K A P I T U L A S I

    PEKERJAAN :

    LOKASI : PROVINSI JAMBI TAHUN : 2015

    NO URAIAN PEKERJAAN JUMLAH

    (Rp)

    I PEKERJAAN PERSIAPAN 459,878,602.60

    II PEKERJAAN ARSITEKTUR DAN INTERIOR 8,019,882,631.38

    III PEKERJAAN STRUKTUR 1,078,401,229.52

    IV PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 3,423,612,442.65

    V PEKERJAAN LANSEKAP DAN SARANA PENDUKUNG 4,291,261,744.15

    JUMLAH 17,273,036,650.30 PPN 10 % 1,727,303,665.03

    JUMLAH TOTAL 19,000,340,315.33 DIBULATKAN 19,000,340,000.00

    Terbilang : Sembilan Belas Milyar Tiga Ratus Empat Puluh Ribu Rupiah

    PEMBANGUNAN GEDUNG KANTOR BALAI WILAYAH SUNGAI SUMATERA VI (TUNTAS)

  • RAB Page 2

    RENCANA ANGGARAN BIAYA ( R A B ) PEKERJAAN : PEMBANGUNAN LANJUTAN GEDUNG KANTOR BALAI SUNGAI WILAYAH SUMATRA VI (TUNTAS)

    LOKASI : PROVINSI JAMBITAHUN ANGGARAN : 2015

    NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

    ( Rp ) ( Rp )

    I PEKERJAAN PERSIAPAN 1 Izin Mendirikan Bangunan (Lt 1, Lt 2 dan Lt. 3) 4,806.00 m2 4,000.00 19,224,000.00 2 Pengukuran dan Pemasangan Bouwplank 1.00 ls 1,500,000.00 1,500,000.00 3 Papan nama proyek 1.00 ls 350,000.00 350,000.00 4 Pembersihan Lapangan Dan Peralatan 4,500.00 8,544.00 38,448,000.00 5 Sewa Pagar Sementara Dengan Seng Gelombang 400.00 m' 150,513.00 60,205,200.00 6 Sewa Kantor semantara 60.00 257,523.25 15,451,395.00 7 Pengadaan air kerja & listrik kerja 1.00 Ls 1,500,000.00 1,500,000.00 8 Pekerjaan Pembongkaran Atap Selasar Penghubung Lantai II 1.00 Ls 15,000,000.00 15,000,000.00

    Pekerjaan Cut Tanah 534.07 Ls 15,000.00 8,011,110.60 Pekerjaan Fill Tanah 712.10 m3 192,578.00 137,134,547.30

    9 Pek. Stripping Tanah 17,453.86 m2 3,500.00 61,088,493.55 10 Pek. Pemadatan Tanah 8,226.37 m2 12,395.00 101,965,856.15

    JUMLAH PEKERJAAN PERSIAPAN 459,878,602.60 II PEKERJAAN ARSITEKTUR DAN INTERIOR A PEKERJAAN PASANGAN / PLESTERAN

    PEKERJAAN PASANGAN / PLESTERAN LANTAI I 1 Pasangan Batu Merah 1 : 6 1,336.72 118,080.00 157,839,897.60 2 Plesteran 1 : 3 2,510.07 43,920.00 110,242,274.40 3 Plesteran 1 : 6 2,673.44 40,480.00 108,220,851.20 4 Acian 2,690.97 27,740.00 74,647,507.80 5 Plesteran Sconengan 1 : 2 + Acian dan Tali Air 511.16 9,639.00 4,927,103.36 6 Plasteran Horisontal 24.20 28,062.00 679,100.40

    PEKERJAAN PASANGAN / PLESTERAN LANTAI II 1 Pasangan Batu Merah 1 : 3 40.59 136,762.30 5,551,181.76 2 Pasangan Batu Merah 1 : 6 1,782.75 128,707.20 229,452,760.80 3 Plesteran 1 : 3 81.18 47,872.80 3,886,313.90 4 Plesteran 1 :6 3,565.50 44,123.20 157,321,269.60 5 Acian 3,646.68 30,236.60 110,263,204.49 6 Plesteran Horisontal 152.51 30,587.58 4,664,911.83 7 Plesteran Sconengan 1 : 2 + Acian dan Tali Air 594.25 10,506.51 6,243,493.57

    PEKERJAAN PASANGAN / PLESTERAN LANTAI III 1 Pasangan Batu Merah 1 : 3 47.85 140,526.40 6,724,188.24 2 Pasangan Batu Merah 1 : 6 3,484.58 132,249.60 460,834,311.17 3 Plesteran 1 : 3 95.70 49,190.40 4,707,521.28 4 Plesteran 1 : 6 6,969.16 45,337.60 315,964,988.42 5 Acian 8,226.39 31,068.80 255,583,962.07 6 Plasteran Horisontal Ornament Atas 1,161.53 31,429.44 36,506,132.68 7 Plesteran Sconengan 1 : 2 + Acian dan Tali Air 190.00 10,795.68 2,051,179.20

    SUB JUMLAH PEKERJAAN PASANGAN/PLESTERAN 2,056,312,153.75 B PEKERJAAN KUSEN DAN PENGGANTUNG + AKSESORIS

    LANTAI I 1 Pintu Jendela (PJ2) 4.00 unit 5,305,617.00 21,222,468.00 2 Jendela (J3) 14.00 unit 5,688,884.00 79,644,376.00 3 Jendela (J4) 8.00 unit 1,490,040.00 11,920,320.00 4 Pintu Km/Wc (P5) 2.00 unit 2,283,941.31 4,567,882.62 5 Pasang Partisi Dengan Rangka Metal Stut 76 mm

    Double Multiplex 9 mm Finishing HPL 960.60 644,060.00 618,681,459.76 6 Kusen Allumunium 4' 568.42 m' 188,424.00 107,104,755.18 7 Plint Aluminium 10 cm 309.22 m' 133,736.00 41,353,845.92 8 Pintu Kayu Doble Teakwood 64.16 483,324.00 31,011,276.15 9 Kaca Bening 5 mm 54.55 123,461.00 6,734,350.00 10 Kaca Es 5mm 13.12 m2 192,124.49 2,520,193.00 11 Kunci Tanam 39.00 bh 173,624.00 6,771,336.00 12 Engsel Pintu 159.00 ps 26,211.00 4,167,549.00 13 Grendel 106.00 bh 54,848.00 5,813,888.00

    LANTAI II 1 Pintu Jendela (PJ2) 4.00 unit 5,783,122.53 23,132,490.12 2 Pintu (P3) 2.00 unit 2,579,564.57 5,159,129.14 3 Pintu Km/Wc (P5) 16.00 unit 2,283,941.31 36,543,060.96 4 Pintu Shafft (P6) 2.00 unit 1,274,975.18 2,549,950.36 5 Jendela (J1) 4.00 unit 4,427,299.87 17,709,199.48 6 Jendela (J2) 2.00 unit 4,061,743.00 8,123,486.00 7 Jendela (J3) 14.00 unit 6,200,883.56 86,812,369.84

    m2

    m2

    m2

    m2

    m2

    m2

    m1

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m1

    m2

    m2

    m2

    m2

    m2

    m2

    m1

    m2

    m2

    m2

  • RAB Page 3

    NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

    ( Rp ) ( Rp ) 8 Jendela (J4) 12.00 unit 1,624,143.60 19,489,723.20 9 Boven (BV) 9.00 unit 521,176.96 4,690,592.64 10 Pasang Partisi Dengan Rangka Metal Stut 76 mm 11 Double Multiplex 9 mm Finishing HPL 942.65 702,025.40 661,763,892.30 12 Kusen Allumunium 4' 451.64 m' 205,382.16 92,759,055.47 13 Plint Aluminium 10 cm 298.83 m' 145,772.24 43,561,118.48 14 Pintu Kayu Doble Teakwood 57.50 526,823.16 30,289,697.58 15 Kaca Es 5mm 11.39 192,124.49 2,187,337.32 16 Kaca Bening 5 mm 39.46 134,572.49 5,310,070.65 17 Kunci Tanam 36.00 bh 189,250.16 6,813,005.76 18 Engsel Pintu 138.00 ps 28,569.99 3,942,658.62 19 Grendel 92.00 bh 59,784.32 5,500,157.44

    LANTAI III 1 Pintu Jendela (PJ2) 5.00 unit 5,942,291.04 29,711,455.20 2 Pintu (P3) 2.00 unit 2,650,561.76 5,301,123.52 3 Pintu Km/Wc (P5) 14.00 unit 2,346,802.08 32,855,229.12 4 Pintu Shafft (P6) 1.00 unit 1,310,066.24 1,310,066.24 5 Jendela (J1) 22.00 unit 4,549,152.16 100,081,347.52 6 Jendela (J2) 2.00 unit 4,549,152.16 9,098,304.32 7 Jendela (J3) 16.00 unit 6,371,550.08 101,944,801.28 8 Jendela (J4) 12.00 unit 1,668,844.80 20,026,137.60 9 Boven (BV) 5.00 unit 535,521.28 2,677,606.40

    Pasang Partisi Dengan Rangka Metal Stut 76 mm 10 Double Multiplex 9 mm Finishing HPL 536.28 721,347.20 386,846,961.80 11 Kusen Allumunium 4' 188.42 m' 211,034.88 39,762,488.64 12 Plint Aluminium 10 cm 168.47 m' 149,784.32 25,234,164.39 13 Pintu Kayu Doble Teakwood 26.48 483,324.00 12,796,002.90 14 Kaca Es 5mm 5.45 197,412.32 1,074,910.08 15 Kaca Bening 5 mm 15.58 138,276.32 2,153,999.37 16 Kunci Tanam 16.00 bh 194,458.88 3,111,342.08 17 Engsel Pintu 66.00 ps 29,356.32 1,937,517.12 18 Grendel 44.00 bh 61,429.76 2,702,909.44

    SUB JUMLAH PEKERJAAN KUSEN DAN PENGGANTUNG + AKSESORIS 2,776,477,062.02 C PEKERJAAN DINDING KACA DAN RAILING

    1 Pasang Dinding Kaca Type- J6 91.23 604,237.73 55,124,607.65 2 Pasang Dinding Kaca Type- J7 9.78 604,237.73 5,909,444.95 3 Pasang Dinding Kaca Type- J8 19.97 604,237.73 12,066,627.37 4 Pasang Dinding Kaca Type- J9 83.09 604,237.73 50,206,112.57 5 Pasang Dinding Kaca Type- J10 7.23 604,237.73 4,368,638.75 6 Pasang Dinding Kaca Type- J11 14.76 604,237.73 8,918,548.82 7 Pasang Dinding Kaca Type- J12 7.11 604,237.73 4,296,130.22 8 Pasang Dinding Kaca Type- J13 8.78 604,237.73 5,305,207.23 9 Pasang Dinding Kaca Type- J14 123.46 604,237.73 74,599,189.53 10 Pasang Dinding Kaca Type- J15 44.40 604,237.73 26,828,154.99 11 Pengadaan dan pemasangan reling tangga utama 20.00 2,150,000.00 43,000,000.00 12 Pengadaan dan pemasangan pegangan reling tangga utama 21.00 450,000.00 9,450,000.00 13 48.00 150,000.00 7,200,000.00 14 38.50 175,000.00 6,737,500.00 15 32.00 125,000.00 4,000,000.00 16 Pengadaan dan pemasangan reling tangga belakang dengan

    pasangan batu bata 1 : 3 20.00 275,000.00 5,500,000.00 17 Pengadaan dan pemasangan pegangan reling tangga belakang 60.00 125,000.00 7,500,000.00 18 Pengadaan dan pemasangan reling tangga jembatan 74.67 185,000.00 13,813,950.00

    SUB JUMLAH PEKERJAAN DINDING KACA DAN RAILING 344,824,112.08 D PEKERJAAN PLAPOND

    LANTAI I 1 Pasang rangka plapond hollow 552.50 122,220.00 67,526,464.45 2 Pasang penutup plapond Gypsum 9mm 552.50 47,394.00 26,185,151.82 3 Rehab Plapond Eksisting 1.00 Ls 15,627,223.62 15,627,223.62 4 Pasang lis tepi gypsum 198.75 m' 26,204.00 5,208,013.56

    LANTAI II 1 Pasang rangka plapond hollow 1,558.82 133,219.80 207,665,035.86 2 Pasang penutup plapond Gypsum 9mm 1,426.60 51,659.46 73,697,390.80 3 Pasang penutup plapond kalsiboard 132.22 55,627.06 7,354,731.74 4 Pasang lis tepi gypsum 1,267.65 m' 28,562.36 36,207,081.37

    LANTAI III 1 Pasang rangka plapond hollow 2,123.07 136,886.40 290,619,039.65 2 Pasang penutup plapond Gypsum 9mm 1,496.70 53,081.28 79,446,778.32 3 Pasang penutup plapond kalsiboard 626.37 57,158.08 35,801,923.66 4 Pasang lis tepi gypsum 1,307.65 m' 29,348.48 38,377,607.37

    SUB JUMLAH PEKERJAAN PLAPOND 883,716,442.22 E PEKERJAAN LANTAI, LAPIS LANTAI, DAN LAPISAN DINDING

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m3

    m1

    m1

    Pengadaan dan pemasangan reling void m2

    Pengadaan dan pemasangan reling tangga lavatory m1

    Pengadaan dan pemasangan pegangan reling tangga lavatory m1

    m2

    m1

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

  • RAB Page 4

    NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

    ( Rp ) ( Rp ) LANTAI I

    1 Urugan Pasir Bawah Lantai 0,5 cm 37.79 169,088.00 6,389,433.09 2 Pasang keramik Kelas I 40 x 40cm Warna 755.75 183,256.00 138,496,161.81 3 Pasang Keramik Dinding 20x25 171.00 175,459.00 30,003,489.00 4 Pasang Didinding Batu alam luar 378.68 228,033.00 86,351,536.44 5 Rehab Lantai Eksisting keramik Kelas I 40 x 40cm Warna 1.00 Ls 20,000,000.00 20,000,000.00

    LANTAI II 1 Urugan Pasir Bawah Lantai 10 cm 183.30 184,305.92 33,783,275.14 2 Pasang keramik Kelas I 40 x 40cm Warna 1,750.00 199,749.04 349,560,820.00 3 Pasang 20 x 20 cm KM/WC PlesiHed 83.00 178,104.91 14,782,707.53 4 Pasang Keramik Dinding 20x25 197.00 191,250.31 37,676,311.07 5 Pasang Border Keramik 10x20 68.00 m' 43,913.92 2,986,146.56 6 Pasang Plint keramik 10x40 575.00 m' 58,682.33 33,742,339.75

    LANTAI III 1 Urugan Pasir Bawah Lantai 10 cm 148.00 189,378.56 28,028,026.88 2 Pasang keramik Kelas I 40 x 40cm Warna 1,442.00 205,246.72 295,965,770.24 3 Pasang 20 x 20 cm KM/WC PlesiHed 38.00 183,006.88 6,954,261.44 4 Pasang Keramik Dinding 20x25 108.00 196,514.08 21,223,520.64 5 Pasang Border Keramik 10x20 72.00 m' 45,122.56 3,248,824.32 6 Pasang Plint keramik 10x40 72.00 m' 60,297.44 4,341,415.68

    SUB JUMLAH PEKERJAAN LANTAI, LAPIS LANTAI, DAN LAPISAN DINDING 1,113,534,039.59 F PEKERJAAN PENGECATAN

    LANTAI I 1 Cat dinding Baru 7,220.58 m2 32,523 234,834,923.34 2 Cat plafond Baru 552.50 m2 32,523 17,968,934.73 3 Plituran Daun Pintu 186.48 m2 61,006 11,376,398.88

    LANTAI II 1 Cat dinding Baru 5,754.91 m2 35,450 204,011,962.34 2 Cat plafond Baru 1,558.82 m2 35,450 55,260,104.41 3 Plituran Daun Pintu 115.52 m2 66,497 7,681,680.30

    LANTAI III 1 Cat diding Baru 5,500.58 m2 36,426 200,362,806.94 2 Cat plafond Baru 2,123.07 m2 36,426 77,334,339.93 3 Plisturan Daun Pintu 79.44 m2 68,327 5,427,874.64 4 Cat Kayu dengan Cat Minyak 112.17 m2 38,081 4,271,635.39 5 Cat Panel GRC 695.57 m2 38,081 26,488,160.80

    SUB JUMLAH PEKERJAAN PENGECATAN 845,018,821.71 JUMLAH PEKERJAAN ARSITEKTUR 8,019,882,631.38

    III PEKERJAAN STRUKTUR

    A Pembetonan Lantai I 1 Balok Latai 15x15 (diatas Kusen) 3.34 m3 1,088,025.00 3,630,467.42 2 Plat Luifel 10x60 (diatas Kusen) 4.69 m3 1,088,025.00 5,098,485.15

    Pekerjaan Sewa Bekesting Lantai I 1 Balok Latai 15x15 (diatas Kusen) 44.49 m2 131,779.00 5,862,847.71 2 Plat Luifel 10x60 (diatas Kusen) 43.68 m2 131,779.00 5,756,106.72

    Pekerjaan Pembesian Beton Lantai I 1 Balok Latai 15x15 (diatas Kusen) 625.41 Kg 20,179.00 12,620,163.73 2 Plat Luifel 10x60 (diatas Kusen) 281.65 Kg 20,179.00 5,683,387.91

    B Pekerjaan Pembetonan Lantai II 1 Balok Latai 15x15 (diatas Kusen) 3.34 m3 1,185,947.25 3,957,209.49 2 Plat Luifel 10x60 (diatas Kusen) 4.69 m3 1,185,947.25 5,557,348.81

    Pekerjaan Sewa Bekesting Lantai II 1 Balok Latai 15x15 (diatas Kusen) 44.49 m2 143,639.11 6,390,504.00 2 Plat Luifel 10x60 (diatas Kusen) 43.68 m2 143,639.11 6,274,156.32

    Pekerjaan Pembesian Beton Lantai II 1 Balok Latai 15x15 (diatas Kusen) 549.07 Kg 21,995.11 12,076,765.31 2 Plat Luifel 10x60 (diatas Kusen) 281.65 Kg 21,995.11 6,194,892.82

    C Pekerjaan Pembetonan Lantai III 1 Balok Latai 15x15 (diatas Kusen) 3.34 m3 1,218,588.00 4,066,123.51 2 Plat Luifel 10x60 (diatas Kusen) 4.69 m3 1,218,588.00 5,710,303.37 3 Plat Lantai Selasar Penghubung 9.51 m3 1,218,588.00 11,584,384.96 4 Kolom Selasar Penghubung 4.80 m3 1,218,588.00 5,849,222.40 5 Ring Balok Selasar 15x30 0.54 m3 1,218,588.00 658,037.52 6 Ring Balok Selasar 15x25 1.77 m3 1,218,588.00 2,156,900.76

    Pekerjaan Sewa Bekesting Lantai III 1 Balok Latai 15x15 (diatas Kusen) 44.49 m2 147,592.48 6,566,389.44 2 Plat Luifel 10x60 (diatas Kusen) 43.68 m2 147,592.48 6,446,839.53

    m3

    m2

    m2

    m2

    m3

    m2

    m2

    m2

    m3

    m2

    m2

    m2

  • RAB Page 5

    NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

    ( Rp ) ( Rp ) 3 Plat Lantai Selasar Penghubung 56.64 m2 147,592.48 8,359,638.07 4 Kolom Selasar Penghubung 36.00 m2 147,592.48 5,313,329.28 5 Ring Balok Selasar 15x30 6.60 m2 147,592.48 974,110.37 6 Ring Balok Selasar 15x25 25.96 m2 147,592.48 3,831,500.78

    Pekerjaan Pembesian Beton Lantai III 1 Balok Latai 15x15 (diatas Kusen) 625.41 Kg 22,600.48 14,134,583.37 2 Plat Luifel 10x60 (diatas Kusen) 281.65 Kg 22,600.48 6,365,394.46 3 Plat Lantai Selasar Penghubung 766.95 Kg 22,600.48 17,333,458.75 4 Kolom Selasar Penghubung 394.37 Kg 22,600.48 8,912,906.10 5 Ring Balok Selasar 15x30 90.85 Kg 22,600.48 2,053,353.05 6 Ring Balok Selasar 15x25 357.36 Kg 22,600.48 8,076,522.00 7 Pekerjaan GRC Panel Lisplank 695.57 M2 750,000.00 521,679,000.00 8 Pekerjaan Rangka GRC Panel Lisplank 695.57 M2 112,000.00 77,904,064.00

    SUB JUMLAH PEKERJAAN BETON BERTULANG 797,078,397.08 D PEKERJAAN ATAP SELASAR LANTAI III

    1 Pekerjaan Atap Baja Ringan Selasar Penghubung 143.06 m2 200,000.00 28,612,000.00 2 Pengadaan dan Pemasangan Lisplank GRC Board 46.00 m1 100,000.00 4,600,000.00 3 Pengadaan dan Pemasangan genteng metal 143.06 m2 120,000.00 17,167,200.00 4 Pengadaan dan Pemasangan bubungan metal 23.00 m1 100,000.00 2,300,000.00

    SUB JUMLAH PEKERJAAN ATAP SELASAR LANTAI III 52,679,200.00 E PEKERJAAN GROUND RESERVOIR

    1 Pek. Galian Tanah Ground Reservoir 198.00 M3 36,352.00 7,197,696.00 2 Pek. Urugan Kembali bekas Galian 58.00 M3 17,427.00 1,010,766.00 3 Pek. Base Course Batu Kali T.20 cm dibawah Pelat Lantai Dasar 7.50 M3 598,891.00 4,491,682.50 4 Pek. Lantai Kerja T.5 cm dibawah Pelat Lantai Dasar 1.87 M3 760,304.00 1,421,768.48 5 Pek. Pembetonan Pelat Lantai Dasar T.25 cm 9.37 M3 847,504.00 7,941,112.48 6 Pek. Pembetonan Dinding Beton Ground Reservoir T.20 cm 21.45 M3 847,504.00 18,178,960.80 7 Pek. Pembetonan Balok Lantai Atas Ground 20/35 0.48 M3 847,504.00 406,801.92 8 Pek. Pembetonan Pelat Lantai Atas Ground T.12 cm 3.78 M3 847,504.00 3,203,565.12 9 Pek. Pembesian Pelat Lantai Dasar T.25 cm 2,576.75 Kg 20,179.00 51,996,238.25 10 Pek. Pembesian Dinding Beton Ground Reservoir T.20 cm 3,753.75 Kg 20,179.00 75,746,921.25 11 Pek. Pembesian Balok Lantai Atas Ground 20/35 67.20 Kg 20,179.00 1,356,028.80 12 Pek. Pembesian Pelat Lantai Atas Ground T.12 cm 529.20 Kg 20,179.00 10,678,726.80 13 Pek. Bekesting Pelat Lantai Dasar T.25 cm 77.77 M2 70,288.00 5,466,368.05 14 Pek. Bekesting Dinding Beton Ground Reservoir T.20 cm 214.50 M2 140,576.00 30,153,552.00 15 Pek. Bekesting Balok Lantai Atas Ground 20/35 3.98 M2 143,639.11 572,258.21 16 Pek. Bekesting Pelat Lantai Atas Ground T.12 cm 31.37 M2 80,111.00 2,513,402.51 17 Pek. Plat Bordes T.4 mm Tutup Manhole Uk.80cmx80cm 1.00 BH 800,000.00 800,000.00 18 Pek. Water Stop PVC 6 " 22.00 M' 63,808.33 1,403,783.26 19 Pek. Water Profing (Coating) Lantai & Dinding Ground Reservoir 108.00 M2 38,000.00 4,104,000.00

    SUB JUMLAH PEKERJAAN GROUND RESERVOIR 228,643,632.44 SUB JUMLAH PEKERJAAN STRUKTUR 1,078,401,229.52

    IV PEKERJAAN MEKANIKAL DAN ELEKTRIKAL A PANEL UTAMA 1 Pengadaan dan pemasangan transformator 3 fase - 500 KVA lengkap

    dengan aksesoris standar, dudukan pondasi, dan proteksi 1.00 unit 199,735,200.00 199,735,200.00 Biaya BP-UJL dan administrasi pemasangan tambah daya PLN

    2 lengkap repasang dengan kapasitas daya 315 KVA (daya kantor) ### VA 1,120.00 352,800,000.00 Power kabel sekelas suprem lengkap bobokan terpasang dari ke panel:

    3 - Panel out going ke trafo N2XSY 3 x (1 x 70) mm2 50.00 mt 415,881.60 20,794,080.00 4 - Trafo ke KWh meter PLN NYFGBY (4 x 240) mm2 15.00 mt 1,404,391.60 21,065,874.00 5 - KWh meter PLN ke LVMDP NYY 2 x (4 x 185) mm2 10.00 mt 1,066,881.60 10,668,816.00 6 - LVMDP ke panel ATS + AMF NYFGBY 2 x (4 x 185) mm2 10.00 mt 1,066,881.60 10,668,816.00 7 - MDP induk ke panel MDP - AC induk NYY (4 x 185) mm2 10.00 mt 1,066,881.60 10,668,816.00 8 - LVMDP ke panel MDP induk NYY 4 x 240 mm'2 50.00 mt 1,404,391.60 70,219,580.00 9 - MDP ke SDP pompa air dan sumur dalam NYY 4 x 16 mm'2 50.00 mt 171,791.60 8,589,580.00 10 - MDP ke SDP penerangan lt. 1 NYY 4 x 16 mm'2 30.00 mt 171,791.60 5,153,748.00 11 - MDP ke SDP penerangan lt. 2 NYY 4 x 16 mm'2 40.00 mt 171,791.60 6,871,664.00 12 - MDP ke SDP penerangan lt. 3 NYY 4 x 16 mm'2 50.00 mt 171,791.60 8,589,580.00 13 - MDP AC ke SDP AC lt. 1 NYY 4 x 25 mm'2 30.00 mt 226,391.60 6,791,748.00 14 - MDP AC ke SDP AC lt. 2 NYY 4 x 25 mm'2 40.00 mt 226,391.60 9,055,664.00 15 - MDP AC ke SDP AC lt. 3 NYY 4 x 25 mm'2 50.00 mt 226,391.60 11,319,580.00 16 - MDP ke MDF NYY 4 x 4 mm'2 20.00 mt 79,391.60 1,587,832.00 17 - MDP ke panel sistem alarm kebakaran NYY 4 x 4 mm'2 20.00 mt 79,391.60 1,587,832.00 18 - Kontrol II SDP panel AC ke SDP AC NYM 4 x 2,5 mm'2 475.00 mt 46,842.40 22,250,140.00 19 - Kontrol I SDP panel ke SDP NYM 4 x 2,5 mm'2 600.00 mt 46,842.40 28,105,440.00

    Pengadaan SDP panel gedung lengkap terpasang sesuai gambar: 20 - LMDP panel lengkap grounding serta aksesoris pendukung standar

    serta sace RCQ (relay proteksi arus tanah) 1.00 unit 35,330,060.00 35,330,060.00

  • RAB Page 6

    NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

    ( Rp ) ( Rp ) 21 - Panel MDP AC 1.00 unit 19,859,604.00 19,859,604.00 22 - Panel MDP induk 1.00 unit 40,580,060.00 40,580,060.00 23 - Panel TM - outgoing PLN 1.00 unit 179,922,580.00 179,922,580.00 24 - Panel PCB (capasitor bank) 1.00 unit 28,000,000.00 28,000,000.00 25 - SDP penerangan 6.00 unit 7,582,230.00 45,493,380.00 26 - SDP AC 6.00 unit 7,552,940.00 45,317,640.00 27 - SDP pompa boster 1.00 unit 7,098,720.00 7,098,720.00 28 - SDP pompa air bersih 1.00 unit 7,098,720.00 7,098,720.00 29 - PL kontrol SDP 2.00 unit 4,347,670.00 8,695,340.00 30 Pentanahan 2.00 bh 450,000.00 900,000.00 31 Merger dan ijin pemasangan instansi terkait 1.00 Ls 2,000,000.00 2,000,000.00

    SUB JUMLAH PANEL UTAMA 1,226,820,094.00 B INSTALASI LISTRIK LANTAI I 1 Armatur lengkap terpasang dengan lampu jenis RMI-reflektor TL 60.00 set 378,000.00 22,680,000.00 2 Armatur lengkap terpasang dengan lampu jenis TKI-TL 1X36w -in 35.00 set 175,000.00 6,125,000.00 3 Armatur lengkap terpasang dengan lampu jenis TKI TL 1X20w 7.00 set 147,000.00 1,029,000.00 4 Armatur lengkap terpasang dengan lampu jenis down light 1X13W 111.00 set 105,000.00 11,655,000.00 5 Lampu gantung terpasang dengan lampu jenis cristal 1.00 set 5,500,000.00 5,500,000.00 6 Saklar tunggal lengkap aksesoris terpasang 40.00 bh 25,900.00 1,036,000.00 7 Saklar ganda lengkap aksesoris terpasang 25.00 bh 28,000.00 700,000.00 8 Stop kontak 1 Psh (dengan penutup) lengkap aksesoris terpasang 84.00 bh 25,900.00 2,175,600.00

    SUB JUMLAH INSTALASI LISTRIK LANTAI I 50,900,600.00 C INSTALASI LISTRIK LANTAI II 1 Armatur lengkap terpasang dengan lampu jenis RMI-reflektor TL 47.00 set 378,000.00 17,766,000.00 2 Armatur lengkap terpasang dengan lampu jenis TKI-TL 1X36w -in 58.00 set 175,000.00 10,150,000.00 3 Armatur lengkap terpasang dengan lampu jenis TKI TL 1X20w 7.00 set 147,000.00 1,029,000.00 4 Armatur lengkap terpasang dengan lampu jenis down light 1X13W 117.00 set 105,000.00 12,285,000.00 5 Armatur lengkap terpasang dengan lampu jenis sorot 150 W 2.00 set 1,201,200.00 2,402,400.00 6 Saklar tunggal lengkap aksesoris terpasang 33.00 bh 25,900.00 854,700.00 7 Saklar ganda lengkap aksesoris terpasang 35.00 bh 28,000.00 980,000.00 8 Stop kontak 1 Psh (dengan penutup) lengkap aksesoris terpasang 83.00 bh 25,900.00 2,149,700.00 9 Tray cable 150X50 lengkap aksesoris terpasang 50.00 m 297,796.00 14,889,800.00 10 Ongkos pemasangan + instalasi lampu penerangan lengkap 137.00 titik 226,280.00 31,000,360.00

    SUB JUMLAH INSTALASI LISTRIK LANTAI II 93,506,960.00 D INSTALASI LISTRIK LANTAI III 1 Armatur lengkap terpasang dengan lampu jenis RMI-reflektor TL 68.00 set 378,000.00 25,704,000.00 2 Armatur lengkap terpasang dengan lampu jenis TKI-TL 1X36w -in 23.00 set 175,000.00 4,025,000.00 3 Armatur lengkap terpasang dengan lampu jenis TKI TL 1X20w 5.00 set 147,000.00 735,000.00 4 Armatur lengkap terpasang dengan lampu jenis down light 1X13W 93.00 set 105,000.00 9,765,000.00 5 Armatur lampu gantung terpasang dengan lampu jenis cristal 2.00 set 5,500,000.00 11,000,000.00 6 Armatur lengkap terpasang dengan lampu jenis TL 2X20 w (decora 8.00 set 1,750,000.00 14,000,000.00 7 Saklar tunggal lengkap aksesoris terpasang 28.00 bh 25,900.00 725,200.00 8 Saklar ganda lengkap aksesoris terpasang 17.00 bh 28,000.00 476,000.00 9 Stop kontak 1 Psh (dengan penutup) lengkap aksesoris terpasang 46.00 bh 25,900.00 1,191,400.00 10 Tray cable 150X50 lengkap aksesoris terpasang 50.00 m 297,796.00 14,889,800.00 11 Ongkos pemasangan + instalasi lampu penerangan lengkap 199.00 titik 226,280.00 45,029,720.00

    SUB JUMLAH INSTALASI LISTRIK LANTAI III 127,541,120.00 E PENGADAAN GENERATOR SET 1 Pengadaan dan pemasangan Generator set lengkap dengan angk 1.00 Unit 630,000,000.00 630,000,000.00

    terpasang diatas pondasi Kapasitas : 400 KVA Type : silence- setara Perkins Kelengkapan Pendukung : -Dacting udara panas dari radiator kebagian luar bangunan -Starting systemchange,altenator dan starting motor

    2 Tangki bahan bakar 1000 l lengkap pemipaan dan aksesoris terp 1.00 Unit 7,000,000.00 7,000,000.00 3 Panel AMF dan ATS lengkap aksesoris terpasang 1.00 Unit 59,848,950.00 59,848,950.00

    SUB JUMLAH PENGADAAN GENERATOR SET 696,848,950.00 F PEKERJAAN PENGKONDISIAN UDARA

    LANTAI I 1 AC 1 PK - type spit lengkap braket 1.00 bh 4,500,000.00 4,500,000.00 2 AC 1.5 PK - type split lengkap braket 14.00 bh 5,180,000.00 72,520,000.00 3 AC 2 PK - type split lengkap braket 3.00 bh 7,840,000.00 23,520,000.00 4 Multi split 2 in 1 kap. 2 X 1.5 PK lengkap braket 7.00 bh 10,360,000.00 72,520,000.00 5 Multi split 2 in 1 kap. 2 X 2 PK lengkap braket 2.00 bh 15,680,000.00 31,360,000.00 6 Ongkos pasang lengkap pipa dan kabel -AC 1 PK 1.00 bh 1,038,860.00 1,038,860.00 7 Ongkos pasang lengkap pipa dan kabel -AC 1.5PK 14.00 bh 1,206,860.00 16,896,040.00 8 Ongkos pasang lengkap pipa dan kabel -AC 2PK 3.00 bh 1,206,860.00 3,620,580.00 9 Ongkos pasang lengkap pipa dan kabel -multi 1.5 - 2 pk 9.00 bh 2,290,860.00 20,617,740.00 10 Exhaust air grill lengkap aksesoris 51.00 bh 350,000.00 17,850,000.00

    LANTAI II

  • RAB Page 7

    NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

    ( Rp ) ( Rp ) 1 AC 1.5 PK - type split lengkap braket 16.00 bh 5,180,000.00 82,880,000.00 2 AC 2 PK - type split lengkap braket 5.00 bh 7,840,000.00 39,200,000.00 3 Multi split 2 in 1 kap. 2 X 1.5 PK lengkap braket 6.00 bh 10,360,000.00 62,160,000.00 4 Multi split 2 in 1 kap. 2 X 2 PK lengkap braket 1.00 bh 15,680,000.00 15,680,000.00 5 Ongkos pasang lengkap pipa dan kabel -AC 1.5 PK 16.00 bh 1,206,860.00 19,309,760.00 6 Ongkos pasang lengkap pipa dan kabel -AC 2PK 5.00 bh 1,206,860.00 6,034,300.00 7 Ongkos pasang lengkap pipa dan kabel multi split 1.00 bh 2,290,860.00 2,290,860.00 8 Exhaust air grill lengkap aksesoris 57.00 bh 350,000.00 19,950,000.00

    LANTAI III 1 AC 1.5 PK - type split lengkap braket 6.00 bh 5,180,000.00 31,080,000.00 2 AC 2 PK - type split lengkap braket 2.00 bh 7,840,000.00 15,680,000.00 3 Multi split 2 in 1 kap. 2 X 1.5 PK lengkap braket 3.00 bh 10,360,000.00 31,080,000.00 4 Multi split 2 in 1 kap. 2 X 2 PK lengkap braket 1.00 bh 15,680,000.00 15,680,000.00 5 Ceiling cassete 18.200 BTUH lengkap pengarah udara dan brake 6.00 bh 12,334,000.00 74,004,000.00 6 Ceiling cassete 26.600 BTUH lengkap pengarah udara dan brake 6.00 bh 15,750,000.00 94,500,000.00 7 Ongkos pasang lengkap pipa dan kabel -AC 1.5PK 6.00 bh 1,206,860.00 7,241,160.00 8 Ongkos pasang lengkap pipa dan kabel -AC 2PK 2.00 bh 1,206,860.00 2,413,720.00 9 Ongkos pasang lengkap pipa dan kabel -cassete 12.00 bh 1,492,860.00 17,914,320.00 10 Ongkos pasang lengkap pipa dan kabel multi split 1.00 bh 2,290,860.00 2,290,860.00 11 Exhaust air grill lengkap aksesoris 43.00 bh 350,000.00 15,050,000.00

    SUB JUMLAH PEKERJAAN PENGKONDISIAN UDARA 818,882,200.00 G PEKERJAAN SUMUR DALAM, PLUMBING DAN SANITASI

    PEKERJAAN SUMUR DALAM 1 Pembasuhan dan Pembuatan bak ampul 1.00 Ls 3,500,000.00 3,500,000.00 2 Pipa Casing 6" medium 20.00 m 350,000.00 7,000,000.00 3 Pipa casing 4" medium 70.00 m 296,909.84 20,783,688.80 4 Jonson skrin section 4" 3.00 set 850,000.00 2,550,000.00 5 Reducer 4"-6" 1.00 bh 250,000.00 250,000.00 6 Grevel pack 1.00 Ls 750,000.00 750,000.00 7 Pengeboran, electric logging, pumping test mutu air di lab 1.00 Ls 7,500,000.00 7,500,000.00 8 Pengadaan dan pemasangan pompa sumersible lengkap aksesori 1.00 unit 20,300,000.00 20,300,000.00

    - Kapasitas : 30m3/m - Daya hisap/tekan : /30 m - Power : 4 kw

    9 Kelengkapan pendukung, gate valve, water meter, Presure gauge dan bak kontrol 1.00 set 3,500,000.00 3,500,000.00

    10 Pipa suplay 2" medium ke ground tank 30.00 m 145,441.20 4,363,236.00 11 Test dan komisioning nyala dan fungsi 1.00 Ls 1,500,000.00 1,500,000.00

    PERALATAN UTAMA (RUMAH POMPA) 1 Pompa air bersih kapasitas 1.5 kw -centrifugal 2.00 unit 16,100,000.00 32,200,000.00 2 Pompa boster 2.00 unit 18,900,000.00 37,800,000.00 3 Strainer 2" 2.00 bh 770,000.00 1,540,000.00 4 Fleksible joint 4.00 bh 770,000.00 3,080,000.00 5 Pressure gauge 3.00 bh 420,000.00 1,260,000.00 6 Pipa header 4" 2.00 m 296,909.84 593,819.68 7 Pipa GIB 1.5" dari ground tank ke bak tandon tower 20.00 m 120,474.53 2,409,490.67 8 Gate valve pipa besi 2" 3.00 bh 145,441.20 436,323.60 9 EWLC ground 2.00 bh 1,190,000.00 2,380,000.00 10 Priming tank kap. 250 l lengkap terpasang 1.00 bh 1,050,000.00 1,050,000.00 11 Floor switch 2.00 bh 1,330,000.00 2,660,000.00 12 Peralatan dan alat bantu 1.00 ls 17,500.00 17,500.00

    PEKERJAAN PLUMBING LANTAI I

    1 Pengadaan dan pemasangan stop kran 1/2" 2.00 bh 28,000.00 56,000.00 2 Pengadaan dan pemasangan pipa PVC jenis AW 1" 35.00 m 25,000.34 875,011.90 3 Pengadaan dan pemasangan pipa PVC jenis AW 1/2" 20.00 m 36,392.84 727,856.80 4 Pengadaan dan pemasangan peralatan sambung pipa PVC 8.00 bh 10,500.00 84,000.00

    LANTAI II 1 Pengadaan dan pemasangan stop kran 3/4" 11.00 bh 28,000.00 308,000.00 2 Pengadaan dan pemasangan pipa PVC jenis AW 1" 12.00 m 25,000.34 300,004.08 3 Pengadaan dan pemasangan pipa PVC jenis AW 1.5" 35.00 m 38,097.26 1,333,404.10 4 Pengadaan dan pemasangan pipa PVC jenis AW 1/2" 20.00 m 36,392.84 727,856.80 5 Pengadaan dan pemasangan pipa PVC jenis AW 3/4" 5.00 m 21,474.09 107,370.45 6 Pengadaan dan pemasangan peralatan sambung pipa PVC 8.00 bh 10,500.00 84,000.00

    LANTAI III 1 Pengadaan dan pemasangan stop kran 3/4" 6.00 bh 28,000.00 168,000.00 2 Pengadaan dan pemasangan pipa PVC jenis AW 1" 6.00 m 25,000.34 150,002.04 3 Pengadaan dan pemasangan pipa PVC jenis AW 1.5" 35.00 m 38,097.26 1,333,404.10 4 Pengadaan dan pemasangan pipa PVC jenis AW 1/2" 10.00 m 36,392.84 363,928.40 5 Pengadaan dan pemasangan pipa PVC jenis AW 3/4" 5.00 m 21,474.09 107,370.45 6 Pengadaan dan pemasangan peralatan sambung pipa PVC 8.00 bh 10,500.00 84,000.00

  • RAB Page 8

    NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

    ( Rp ) ( Rp ) PEKERJAAN SANITASI

    LANTAI I 1 Kran Air Dia 1/2 " 2.00 Bh 66,714.00 133,428.00 2 Pasang Closed Duduk Lengkap 1.00 Set 3,033,156.00 3,033,156.00 3 Wastafel Lengkap Terpasang 2.00 Set 1,410,610.00 2,821,220.00 4 Bak Mandi Pas Bata Lapis Kramik Lengkap 1.00 Unit 1,515,732.00 1,515,732.00 5 Pembuangan Air / Affour Stenlees steel 1.00 Bh 31,164.00 31,164.00 6 Pasang Cermin Lavatory 1.00 Uset 2,226,400.00 2,226,400.00

    LANTAI II 1 Kran Air Dia 1/2 " 21.00 Bh 72,718.26 1,527,083.46 2 Pasang Closed Duduk Lengkap 10.00 Set 3,306,140.04 33,061,400.40 3 Urinoar 8.00 Set 2,985,106.70 23,880,853.60 4 Wastafel Lengkap Terpasang 12.00 Set 1,537,564.90 18,450,778.80 5 Bak Mandi Pas Bata Lapis Kramik Lengkap 11.00 Unit 1,652,147.88 18,173,626.68 6 Pembuangan Air / Affour Stenlees steel 12.00 Bh 33,968.76 407,625.12 7 Pasang Cermin Lavatory 7.00 Uset 2,226,400.00 15,584,800.00

    LANTAI III 1 Kran Air Dia 1/2 " 16.00 Bh 74,719.68 1,195,514.88 2 Pasang Closed Duduk Lengkap Terpasang 9.00 Set 3,397,134.72 30,574,212.48 3 Urinoar 8.00 Set 3,067,265.60 24,538,124.80 4 Wastafel 11.00 Set 1,579,883.20 17,378,715.20 5 Bak Mandi Pas Bata Lapis Kramik Lengkap 9.00 Unit 1,697,619.84 15,278,578.56 6 Pembuangan Air / Affour Stenlees steel 10.00 Bh 34,903.68 349,036.80 7 Reservoir Stainless + Kaki 1000 Lt 4.00 Unit 4,226,400.00 16,905,600.00 8 Cermin Lavatory 8.00 Uset 2,226,400.00 17,811,200.00

    SUB JUMLAH PEKERJAAN SUMUR DALAM, PLUMBING DAN SANITASI 409,112,518.65 SUB JUMLAH PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 3,423,612,442.65

    V PEKERJAAN LANSEKAP DAN SARANA PENDUKUNG A Pembuatan Saluran

    1 Saluran U-30 Buis Beton Keliling Bangunan 252.00 m' 208,679.00 52,587,108.00 2 Saluran Buis beton dia-60 23.00 m' 280,490.00 6,451,270.00 3 Pembuatan Bak Kontrol Air Hujan Pas, bata Uk 45x45 cm 17.00 Bh 301,975.00 5,133,575.00 4 Rabat Beton Keliling bangunan 7 cm 504.00 760,304.00 383,193,216.00 5 Kansteen Tepi Jalan Uk 15x20x30x50 cm 648.00 m' 80,000.00 51,840,000.00 6 Galian Pondasi 182.30 47,737.00 8,702,455.10 7 Urugan Kembali 60.77 17,427.00 1,059,038.79 8 Urugan Pasir bawah Pondasi 21.84 169,088.00 3,692,881.92 9 Pas. PVC 2" 143.64 m' 36,379.00 5,225,479.56 10 Pas. Batu Belah 1:5 302.52 800,540.00 242,179,360.80 11 Pas. Siaran Dinding batu Belah 1:2 430.92 140,147.00 60,392,145.24 12 Plesteran 1:6 254.87 22,443.00 5,720,047.41 13 Acian 254.87 27,740.00 7,070,093.80 14 Pasang Ijuk 4.30 127,332.00 547,527.60

    Sub Jumlah Pembuatan Saluran 833,794,199.22 B Perkerasan Jalan Dengan Paving

    1 Jalan Dg Paving Blok Motif 8 Cm 4,033.42 182,270.00 735,172,357.47 2 Trotoar Dg Paving 8 cm 186.78 182,270.00 34,044,390.60 3 Halaman Parkir Paving 8 cm natural 401.76 182,270.00 73,228,795.20 4 Grass Blok 75.36 187,320.00 14,116,435.20

    Sub Jumlah Perkerasan Jalan Dengan Paving 856,561,978.47 C Perkerasan Pada Lapangan Upacara

    19 Paving Motif 8 cm 84.21 182,270.00 15,348,956.70 20 Batu Pecah 19.24 65,000.00 1,250,600.00 21 Batu Koral Sikat 21.29 75,000.00 1,596,750.00

    Sub Jumlah Perkerasan Pada Lapangan Upacara 18,196,306.70 D Pek. Pot Bunga

    22 Pas. Batu bata 1:6 32.60 118,080.00 3,849,408.00 23 Plesteran 1:6 65.20 40,480.00 2,639,296.00 24 Acian 42.20 27,740.00 1,170,628.00 25 Plesteran ornamen 96.00 m' 28,062.00 2,693,952.00 26 Tanah humus 5.60 125,000.00 700,000.00

    Sub Jumlah Pekerjaan Pot Bunga 11,053,284.00 E Pek. Pembangunan kantor Keamanan ( Pos Jaga )

    27 Galian Tanah Pondasi 22.40 36,352.00 814,284.80 28 Urugan Tanah Kembali 7.47 17,427.00 130,121.60 29 Urugan Pasir Bawah Pondasi 10 cm 2.52 169,088.00 426,101.76 30 Aanstamping 5.04 598,891.00 3,018,410.64 31 Pas Pondasi Bt Belah 1 : 5 9.80 800,540.00 7,845,292.00 32 Pembetonan Sloof 15/25 1.05 847,504.00 889,879.20 33 Pembetonan Kolom 12/12 0.51 847,504.00 432,227.04

    m3

    m3

    m3

    m3

    m3

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m3

    m3

    m3

    m3

    m3

    m3

    m3

    m3

  • RAB Page 9

    NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

    ( Rp ) ( Rp ) 34 Pembetonan Balok Latiu 15/20 0.36 847,504.00 305,101.44 35 Pembetonan Plat Beton Tritisan 8 cm 0.84 847,504.00 711,903.36 36 Pembetonan Ring Balk 15/20 0.35 847,504.00 296,626.40 37 Begestingan Sloof 15/25 14.00 70,288.00 984,032.00 38 Begestingan Kolom 12/12 11.55 85,150.00 983,482.50 39 Begestingan Balok Latiu 15/20 3.60 85,150.00 306,540.00 40 Begestingan Plat Beton Tritisan 8 cm 11.20 142,504.00 1,596,044.80 41 Begestingan Ring Balk 15/20 4.92 85,150.00 418,938.00 42 Pembesian Sloof 15/25 30.40 Kg 20,179.00 613,441.60 43 Pembesian Kolom 12/12 23.30 Kg 20,179.00 470,170.70 44 Pembesian Balok Latiu 15/20 11.44 Kg 20,179.00 230,847.76 45 Pembesian Plat Beton Tritisan 8 cm 26.70 Kg 20,179.00 538,779.30 46 Pembesian Ring Balk 15/20 7.92 Kg 20,179.00 159,817.68 47 Pas. Batu bata 1:3 19.60 125,470.00 2,459,212.00 48 Pas. Batu bata 1:6 58.71 118,080.00 6,932,476.80 49 Pas. Batu bata 1:6 Pot Tanaman 3.12 118,080.00 368,409.60 50 Plesteran 1:3 39.20 40,480.00 1,586,816.00 51 Plesteran 1:6 117.42 40,480.00 4,753,161.60 52 Plesteran 1:6 Pot Tanaman 4.12 40,480.00 166,777.60 53 Plesteran Ornamen Kolom 6.72 28,062.00 188,576.64 54 Plesteran Sudut dan Skonengan 127.70 m' 9,639.00 1,230,900.30 55 Acian 186.41 27,740.00 5,171,013.40 56 Kusen Allumunium Pintu Dan Jendela 34.37 m' 188,424.00 6,476,132.88 57 Daun Pintu 5.20 483,324.00 2,513,284.80 58 Daun Jendela 1.54 395,653.00 609,305.62 59 Pasang Kaca bening 5mm 1.76 123,461.00 217,291.36 60 Pasang Engsel Pintu 9.00 Bh 26,211.00 235,899.00 61 Pasang Engsel Jendela 14.00 Bh 20,624.00 288,736.00 62 Pasang Kunci Pintu 3.00 Set 173,624.00 520,872.00 63 Kait Angin Jendela 7.00 Set 20,011.00 140,077.00 64 Pekerjaan Atap Baja Ringan 72.96 m2 200,000.00 14,592,000.00 65 Pengadaan dan Pemasangan genteng metal 72.96 m2 120,000.00 8,755,200.00 66 Pengadaan dan Pemasangan bubungan metal 22.00 m1 100,000.00 2,200,000.00 67 Lisplank kalsiboard 2/20x2 86.56 m' 100,000.00 8,656,000.00 68 Pasang Rangka Plafond Hollo 59.29 122,220.00 7,246,423.80 69 Penutup Plafond Kalsiboad 4 mm 59.29 51,034.00 3,025,805.86 70 Pasang Lis Tepi Plafond 86.56 m' 19,146.00 1,657,277.76 71 Pasang Saklar Tunggal 1.00 Titik 18,500.00 18,500.00 72 Pasang Saklar Ganda 2.00 Titik 20,000.00 40,000.00 73 Pasang Stop Kontak 2.00 Titik 18,500.00 37,000.00 74 Pasang Instalasi lampu 9.00 Titik 145,000.00 1,305,000.00 75 Pasang Lampu Pijar Kamar Mandi 20 Watt 3.00 Bh 10,000.00 30,000.00 76 Armatur lengkap dengan lampu jenis TKI TL 1X20w 2.00 Set 105,000.00 210,000.00 77 Pasang Lampu SL Tritisan 18 Watt 4.00 bh 45,000.00 180,000.00 78 Urugan Pasir Bawah Lantai 10 cm 2.92 169,088.00 493,736.96 79 Pasang Keramik Lantai kelas1, 40x40 warna 21.25 183,256.00 3,894,190.00 80 Pasang Keramik Lantai Kamar Mandi Antiselip 20x20 3.75 163,399.00 612,746.25 81 Pasang Keramik Dinding Kamar Mandi 20x25 12.00 175,459.00 2,105,508.00 82 Pasang Beton Koral Sikat Teras 4.20 75,000.00 315,000.00 83 Cat Dinding 186.41 32,523.00 6,062,612.43 84 Cat Plafond 59.29 32,523.00 1,928,288.67 85 Plisturan 10.40 61,006.00 634,462.40 86 Pasang Kloset duduk lengkap 1.00 Unit 3,033,156.00 3,033,156.00 87 Pasang Wastafel 1.00 Set 1,410,610.00 1,410,610.00 88 Pasang kran 2.00 bh 66,714.00 133,428.00 89 Pasang Floor drain 1.00 bh 31,164.00 31,164.00 90 Pasang Loster Dinding 15x30 21.00 bh 25,000.00 525,000.00

    Sub Jumlah Pek. Pembangunan kantor Keamanan ( Pos Jaga ) 124,164,095.31 F Pek. Tiang Bendera

    1 Pas. Batu bata 1:6 11.25 118,080.00 1,328,400.00 2 Plesteran 1:6 11.25 40,480.00 455,400.00 3 Acian 11.25 27,740.00 312,075.00 4 Plesteran ornamen 12.00 m' 28,062.00 336,744.00 5 Tiang bendera 1.00 ls 750,000.00 750,000.00

    Sub Jumlah Pek. Tiang Bendera 3,182,619.00 G Vegetasi Halaman

    1 Palm Ekor Tupai 8.00 Bh 175,000.00 1,400,000.00 2 Kiara payung 35.00 Bh 50,000.00 1,750,000.00 3 Sawo Kecik 55.00 Bh 50,000.00 2,750,000.00 4 Sokka 75.00 Bh 5,000.00 375,000.00 5 Lantana 250.00 Bh 3,000.00 750,000.00 6 Lantana Camara 250.00 Bh 3,000.00 750,000.00 7 Kacang-kacangan 750.00 Bh 1,500.00 1,125,000.00

    m3

    m3

    m3

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m3

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

    m2

  • RAB Page 10

    NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

    ( Rp ) ( Rp ) 8 Rumput Gajah 75.00 65,000.00 4,875,000.00 9 Rumput Biasa 200.00 25,000.00 5,000,000.00

    Sub Jumlah Vegetasi Halaman 18,775,000.00 H Kolam Hias

    1 Pembuatan Kolam Hias 1.00 Unit 30,500,000.00 30,500,000.00 2 Pengadaan pompa air mancur+aksesoris 1.00 Unit 8,500,000.00 8,500,000.00

    Sub Jumlah Kolam Hias 39,000,000.00 I Lettering Nama Gedung

    1 Lettering Stainless Terpasang + logo PU 1.00 Unit 28,000,000.00 28,000,000.00

    Sub Jumlah Kolam Hias 28,000,000.00 J PEKERJAAN PAGAR KELILING

    1 Bowplank dan Pengukuran 762.65 m' 97,860.00 74,632,929.00 2 Galian Tanah 447.02 m3 36,352.00 16,249,889.28 3 Urugan Tanah Kembali 149.01 m3 17,427.00 2,596,710.14 4 Urugan Pasir Bawah Pondasi 41.95 m3 169,088.00 7,092,522.98 5 Lantai Kerja bawah tapak 41.95 m3 760,304.00 31,891,521.51 6 Pembetonan Tapak Ukuran 70/ 100 31.24 m3 847,504.00 26,473,906.20 7 Pembetonan Kolom Uk.25 / 25 50.20 m3 847,504.00 42,547,349.25 8 Pembetonan Sloof 20 / 30 45.76 m3 847,504.00 38,780,935.54 9 Pembetonan Ringbalk 15/20 47.67 m3 847,504.00 40,396,807.85 10 Pembesian Tapak Ukuran 70/ 100 9,050.75 Kg 20,179.00 182,634,995.46 11 Pembesian Kolom Uk.25 / 25 7,207.08 Kg 20,179.00 145,431,570.46 12 Pembesian Sloof 20 / 30 8,772.31 Kg 20,179.00 177,016,349.86 13 Pembesian Ringbalk 15/20 5,012.75 Kg 20,179.00 101,152,199.92 14 Bekesting Tapak Ukuran 70/ 100 153.00 m2 70,288.00 10,754,064.00 15 Bekesting Kolom Uk.25 / 25 548.25 m2 126,704.00 69,465,468.00 16 Bekesting Sloof 20 / 30 457.59 m2 140,576.00 64,326,171.84 17 Bekesting Ringbalk 15/20 419.46 m2 131,779.00 55,275,689.89 18 Pasangan 1/2 Bata 1,262.25 m2 118,080.00 149,046,480.00 19 Plesteran 1:6 3,060.00 m2 40,480.00 123,868,800.00 20 Cat Tembok 3,060.00 m2 32,523.00 99,520,380.00 21 Teralis Pagar Hollow 25.26 m2 700,000.00 17,684,210.53 22 Pasangan Batu Alam 75.16 m2 228,033.00 17,138,480.21 23 Gerbang Hollow 3 Unit 48.00 m2 700,000.00 33,600,000.00

    SUB JUMLAH PEKERJAAN PAGAR KELILING 1,527,577,431.91 K PEKERJAAN RUMAH GENSET

    1 Pek. Galian Pondasi Pelat Setempat & Sloof 9.60 M3 36,352.00 348,979.20 2 Pek. Galian Pondasi Genset 3.37 M3 36,352.00 122,506.24 3 Pek. Urugan Kembali bekas Galian Pondasi 7.54 M3 17,427.00 131,399.58 4 Pek. Pasir Urug padat T.5 cm dibawah Pondasi & Sloof 0.64 M3 169,088.00 108,216.32 5 Pek. Lantai Kerja T.5 cm dibawah Pondasi , Sloof & Pondasi Gense 0.98 M3 760,304.00 745,097.92 6 Pek. Base Course Batu Kali T.20 cm dibawah Pondasi Genset 1.35 M3 598,891.00 808,502.85 7 Pasangan 1/2 Bata 62.72 m2 118,080.00 7,405,977.60 8 Plesteran 1:6 125.44 m2 40,480.00 5,077,811.20 9 Pek. Pembetonan Pondasi Pelat Uk.80x80x T.25 cm 1.28 M3 847,504.00 1,084,805.12 10 Pek. Pembetonan Sloof 20/25 1.30 M3 847,504.00 1,101,755.20 11 Pek. Pembetonan Kolom 25/25 1.60 M3 847,504.00 1,356,006.40 12 Pek. Pembetonan Pelat Lantai T.15 cm 9.90 M3 847,504.00 8,390,289.60 13 Pek. Pembetonan Pondasi Genset Uk.1.50x4.50x T 0.50 3.38 M3 847,504.00 2,860,326.00 14 Pek. Pembetonan Kolom Praktis 16.04 M3 847,504.00 13,597,862.68 15 Pek. Pembetonan Balok Atap Dak 20/30 2.04 M3 847,504.00 1,728,908.16 16 Pek. Pembetonan Balok Atap Dak 15/20 0.44 M3 847,504.00 371,206.75 17 Pek. Pembetonan Pelat Atap Dak T.10 cm 6.60 M3 847,504.00 5,593,526.40 18 Pek. Pembesian Pondasi Pelat Uk.80x80x T.25 cm 283.94 Kg 20,179.00 5,729,725.35 19 Pek. Pembesian Sloof 20/25 299.06 Kg 20,179.00 6,034,780.17 20 Pek. Pembesian Kolom 25/25 336.53 Kg 20,179.00 6,790,785.60 21 Pek. Pembesian Pelat Lantai T.15 cm 893.69 Kg 20,179.00 18,033,827.01 22 Pek. Pembesian Pondasi Genset Uk.1.50x4.50x T 0.50 162.68 Kg 20,179.00 3,282,655.15 23 Pek. Pembesian Kolom Praktis 136.71 Kg 20,179.00 2,758,756.65 24 Pek. Pembesian Balok Atap Dak 20/30 335.21 Kg 20,179.00 6,764,259.09 25 Pek. Pembesian Balok Atap Dak 15/20 71.97 Kg 20,179.00 1,452,326.22 26 Pek. Pembesian Pelat Atap Dak T.10 cm 595.80 Kg 20,179.00 12,022,551.34 27 Pek. Bekesting Pondasi Pelat Uk.80x80x T.25 cm 4.80 m2 70,288.00 337,382.40 28 Pek. Bekesting Sloof 20/25 15.60 m2 140,576.00 2,192,985.60 29 Pek. Bekesting Kolom 25/25 25.60 m2 126,704.00 3,243,622.40 30 Pek. Bekesting Pelat Lantai T.15 cm 1.50 m2 143,639.11 215,458.67 31 Pek. Bekesting Pondasi Genset Uk.1.50x4.50x T 0.50 6.00 m2 140,576.00 843,456.00 32 Pek. Bekesting Kolom Praktis 20.80 m2 126,704.00 2,635,443.20 33 Pek. Bekesting Balok Atap Dak 20/30 27.20 m2 143,639.11 3,906,983.79 34 Pek. Bekesting Balok Atap Dak 15/20 4.02 m2 143,639.11 576,711.03

    m2

    m2

  • RAB Page 11

    NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

    ( Rp ) ( Rp ) 35 Pek. Bekesting Pelat Atap Dak T.10 cm 44.00 m2 80,111.00 3,524,884.00 36 Pek. Water Profing (Coating) Pelat Atap + Screed Kemiringan 66.00 M2 43,000.00 2,838,000.00 37 Pek. Pintu Besi 1.00 Unit 5,500,000.00 5,500,000.00 38 Pek. Ventilasi Alumunium 15.00 Unit 750,000.00 11,250,000.00 39 Pek. Cat Tembok 125.44 M2 32,523.00 4,079,685.12

    SUB JUMLAH PEKERJAAN RUMAH GENSET 154,847,455.99 L PEKERJAAN MUSHALLA

    1 Pek. Galian Pondasi Pelat Setempat & Sloof 42.96 M3 36,352.00 1,561,536.51 2 Pek. Urugan Kembali bekas Galian Pondasi 14.32 M3 17,427.00 249,531.40 3 Pek. Pasir Urug padat T.5 cm dibawah Pondasi & Sloof 1.33 M3 169,088.00 225,647.94 4 Pek. Lantai Kerja T.5 cm dibawah Pondasi , Sloof & Pondasi Gense 1.33 M3 760,304.00 1,014,625.69 5 Pek. Urugan Tanah dipadatkan bawah lantai 53.87 M3 192,578.00 10,373,945.77 6 Pasangan 1/2 Bata 308.11 m2 118,080.00 36,381,628.80 7 Plesteran 1:6 616.22 m2 40,480.00 24,944,585.60 8 Pek. Acian 616.22 m2 31,068.80 19,145,215.94 9 Pek. Pembetonan Pondasi Pelat Uk.100x100x T.25 cm 5.00 M3 847,504.00 4,237,520.00 10 Pek. Pembetonan Pondasi Pelat Uk. 70x70x T.20 cm 0.78 M3 847,504.00 664,443.14 11 Pek. Pembetonan Sloof 20/30 4.97 M3 847,504.00 4,210,399.87 12 Pek. Pembetonan Kolom 20/20 1.25 M3 847,504.00 1,057,684.99 13 Pek. Pembetonan Kolom 30/30 13.56 M3 847,504.00 11,494,696.75 14 Pek. Pembetonan Balok 20/30 7.41 M3 847,504.00 6,283,055.65 15 Pek. Pembetonan Balok 15/20 0.65 M3 847,504.00 549,182.59 16 Pek. Pembetonan Pelat Dak T.10 cm 1.15 M3 847,504.00 976,324.61 17 Pek. Pembetonan Kolom Praktis 0.50 M3 847,504.00 426,599.61 18 Pek. Pembesian Pondasi Pelat Uk.Uk.100x100x T.25 cm 788.74 Kg 20,179.00 15,915,903.74 19 Pek. Pembesian Pondasi Pelat Uk. 70x70x T.20 cm 283.94 Kg 20,179.00 5,729,725.35 20 Pek. Pembesian Sloof 20/30 952.40 Kg 20,179.00 19,218,453.77 21 Pek. Pembesian Kolom 20/20 546.86 Kg 20,179.00 11,035,026.60 22 Pek. Pembesian Kolom 30/30 720.38 Kg 20,179.00 14,536,525.42 23 Pek. Pembesian Balok 20/30 1,218.20 Kg 20,179.00 24,582,113.33 24 Pek. Pembesian Balok 15/20 140.18 Kg 20,179.00 2,828,598.59 25 Pek. Pembesian Pelat Dak T.10 cm 103.99 Kg 20,179.00 2,098,481.69 26 Pek. Pembesian Kolom Praktis 89.99 Kg 20,179.00 1,815,890.45 27 Pek. Bekesting Pondasi Pelat Uk.100x100x T.25 cm 8.00 m2 70,288.00 562,304.00 28 Pek. Bekesting Pondasi Pelat Uk. 70x70x T.20 cm 8.00 m2 140,576.00 1,124,608.00 29 Pek. Bekesting Sloof 20/30 49.68 m2 126,704.00 6,294,654.72 30 Pek. Bekesting Kolom 20/20 33.28 m2 143,639.11 4,780,309.58 31 Pek. Bekesting Kolom 30/30 65.76 m2 143,639.11 9,445,707.87 32 Pek. Bekesting Balok 20/30 98.85 m2 143,639.11 14,198,438.75 33 Pek. Bekesting Balok 15/20 11.88 m2 143,639.11 1,706,432.63 34 Pek. Bekesting Pelat Dak T.10 cm 7.68 m2 143,639.11 1,103,148.36 35 Pek. Bekesting Kolom Praktis 9.15 m2 143,639.11 1,314,585.13 36 Pek. Urugan Pasir Bawah Lantai 10 cm 13.47 M3 169,088.00 2,277,141.91 37 Pek. Lantai kerja T.5 cm dibawah Keramik 6.73 M3 760,304.00 5,119,583.01 38 Pek. Lantai Granit 60x60 113.40 m2 378,256.00 42,894,230.40 39 Pek. Lantai Keramik kasar 40x40 72.74 m2 183,256.00 13,329,308.42 40 Pek. Pasang Keramik Dinding 20x25 29.57 m2 175,459.00 5,187,971.71 41 Pek. Pasang Border Keramik 10x20 18.48 m1 43,913.92 811,529.24 42 Kran Air Dia 1/2 " 6.00 bh 66,714.00 400,284.00 43 Pasang Closed Jongkok 2.00 bh 399,768.00 799,536.00 44 Pembuangan Air / Affour Stenlees steel 4.00 bh 31,164.00 124,656.00 45 Pengadaan dan pemasangan pipa PVC jenis AW 1" 15.00 m 25,000.34 375,005.10 46 Pengadaan dan pemasangan pipa PVC jenis AW 1/2" 25.00 m 36,392.84 909,821.00 47 Pengadaan dan pemasangan peralatan sambung pipa PVC 8.00 bh 10,500.00 84,000.00 48 Septiktank 1.00 Unit 7,500,000.00 7,500,000.00 49 Pasang rangka plapond hollow 148.67 m2 122,220.00 18,170,691.84 50 Pasang penutup plapond Gypsum 9mm 148.67 m2 47,394.00 7,046,160.77 51 Pasang penutup plapond kalsiboard 14.40 m2 55,627.06 801,029.66 52 Pasang lis tepi gypsum 81.00 m1 26,204.00 2,122,524.00 53 Pekerjaan Atap Baja Ringan 230.70 m2 200,000.00 46,139,760.00 54 Pengadaan dan Pemasangan Lisplank GRC Board 145.20 m1 100,000.00 14,520,000.00 55 Pengadaan dan Pemasangan genteng metal 230.70 m2 120,000.00 27,683,856.00 56 Pengadaan dan Pemasangan bubungan metal 60.00 m1 100,000.00 6,000,000.00 57 Pek. Cat Tembok 616.22 m2 32,523.00 20,041,323.06 58 Pek. Cat Plapond 163.07 m2 32,523.00 5,303,590.66 59 Pek. Cat GRC 66.11 m2 32,523.00 2,149,932.92 60 Pintu PM1 3.00 Unit 13,713,859.00 41,141,577.00 61 Jendela JM1 4.00 Unit 11,216,971.00 44,867,884.00 62 Pintu Jendela PJM1 2.00 Unit 5,458,597.00 10,917,194.00 63 Pek. Panel Penerangan 1.00 Unit 5,500,000.00 5,500,000.00 64 Armatur lengkap terpasang dengan lampu jenis TKI-TL 1X36w -in 4.00 Set 175,000.00 700,000.00 65 Armatur lengkap terpasang dengan lampu jenis down light 1X13W 21.00 Set 105,000.00 2,205,000.00

  • RAB Page 12

    NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

    ( Rp ) ( Rp ) 66 Armatur lampu gantung terpasang dengan lampu jenis cristal 1.00 Set 5,500,000.00 5,500,000.00 67 Saklar tunggal lengkap aksesoris terpasang 4.00 Set 25,900.00 103,600.00 68 Saklar ganda lengkap aksesoris terpasang 3.00 Set 28,000.00 84,000.00 69 Stop kontak 1 Psh (dengan penutup) lengkap aksesoris terpasang 5.00 Set 25,900.00 129,500.00 70 Ongkos pemasangan + instalasi lampu penerangan lengkap 38.00 titik 226,280.00 8,598,640.00 71 GRC panel Motif 66.11 m2 750,000.00 49,578,750.00 72 Rangka GRC Panel Motif 66.11 m2 112,000.00 7,403,760.00 73 Pengadaan dan Pemasangan Ornamen Stainless Puncak Mushalla 1.00 Set 7,500,000.00 7,500,000.00

    SUB JUMLAH PEKERJAAN MUSHALLA 676,109,373.55 JUMLAH PEKERJAAN LANSEKAP DAN SARANA PENDUKUNG 4,291,261,744.15

    JUMLAH TOTAL 17,273,036,650.30

  • HARGA BAHAN Page 13

    DAFTAR HARGA UPAH DAN BAHAN

    NO U R A I A N SATUAN

    I. U P A H1 Pekerja Hari 80,000.002 Tukang Gali Hari 92,400.003 Mandor Hari 108,800.004 Tukang cat/ plitur / batu Hari 92,400.005 Kepala tukang cat/ plitur / batu Hari 108,000.006 Tukang kayu Hari 92,400.007 Kepala tukang kayu Hari 108,000.008 Tukang Besi Hari 92,400.009 Kepala Tukang besi Hari 108,000.00

    10 Tukang Besi Profil Hari 92,400.0011 Kepala Tukang besi Profil Hari 108,000.0012 Mekanik Hari 92,000.0013 Mekanik Pembantu Hari 73,600.0014 Operator terlatih/ masinis Hari 112,000.0015 Operator kurang terlatih Hari 100,000.0016 Pembantu operator/ pemb. masinis Hari 92,400.0017 Sopir truk Hari 84,000.0018 Sopir personil Hari 84,000.0019 Pembantu sopir Hari 76,000.0020 Buruh lapangan tak terlatih Hari 70,000.0021 Buruh lapangan kurang terlatih Hari 80,000.0022 Buruh lapangan terlatih Hari 90,000.0023 Tukang masak aspal Hari 80,000.0024 Penjaga malam Hari 80,000.00

    II B A H A N1 Abu batu 186,150.002 Amplas Lbr 5,000.003 Asbes Gelombang 300 x 102 x 0.5 cm (besar) LBR 105,800.004 Asbes Gelombang 180 x 105 x 0.5 cm (kecil) LBR 54,300.005 Aspal curah Kg 8,500.006 Aspal drum Kg 10,000.007 Atap sirap 4 lapis Bh 800.008 Bak Cuci Stainless Steel "Royal" Bh 194,850.009 Bak Cuci Stainless Steel "Viega" ( 1,00 x 0,90 ) m2 Bh 261,750.00

    10 Bak Cuci Stainless Steel 80 Cm Bh 139,150.0011 Bak Mandi Fibreglass, Vol 120 ltr Sudut Bh 300,000.0012 Bak Mandi Fibreglass, Vol 0.5 M3 Bh 355,000.0013 Bak Mandi Fibreglass, Vol 1 M3 Bh 790,000.0014 Batu apung ( gosok ) Kg 14,500.0015 Batu Bata BUAH 900.0016 Batu Belah Gunung 380,000.0017 Batu Belah 40% 325,000.0018 Batu Blonos 275,000.0019 Batu pecah dg mesin (1-2cm) 385,000.0020 Batu pecah dg mesin (0,5-

  • HARGA BAHAN Page 14

    NO U R A I A N SATUAN HARGA SATUAN (Rp)26 Batu Split 3/5 - 5/7 (pecah tangan) 305,000.0027 Batu Tempel ( Muka Segi 6 ) tebal 10 cm Buah 2,000.0028 Batu Tempel Palimanan Hijau 116,400.0029 Batu Tempel Palimanan Kuning 112,650.0030 Batu Tempel ( Tidak Beraturan ) Kecil 76,400.0031 Batu Tempel ( Tidak Beraturan ) Besar 98,350.0032 Batu Teraso BUAH 15,250.0033 Batu Candi Tempel 20/20, 5/20 250,000.0034 Besi Beton U 24 KG 18,250.0035 Besi Beton U 32 KG 18,250.0036 Besi IWF KG 30,000.0037 Besi Siku / Profil KG 25,000.0038 Besi Prestressed polos KG 14,500.0039 Besi Strip ( tebal 5mm, lebar 5 cm ) KG 18,250.0040 Besi Hollow 4x4 cm Btg 25,000.0041 Beton K 175 Ready Mix 700,000.0042 Beton K 225 Ready Mix 850,000.0043 Beton K 300 Ready Mix 1,450,000.0044 Bondex ( plat beton ) 191,200.00 45 BRC tinggi 60 cm ( Pagar ) 6 mm M' 124,400.0046 BRC tinggi 90 cm ( Pagar ) 6 mm M' 138,300.0047 BRC tinggi 110 cm ( Pagar ) 6 mm M' 295,000.0048 Bubungan Asbes (besar) M' 65,700.0049 Bubungan Asbes (kecil) M' 44,800.0050 Bubungan Genteng beton abu-2 (isi 3 / M') BUAH 6,150.0051 Bubungan genteng beton warna (isi 3 bh) BUAH 7,700.0052 Bubungan Genteng keramik "KIA" BUAH 20,100.0053 Bubungan Genteng keramik pertigan "KIA" BUAH 85,400.0054 Bubungan Genteng "Morando" natural BUAH 6,900.0055 Bubungan Genteng "Morando" Glazur BUAH 10,050.0056 Bubungan genteng Plentonng "s" ( isi 4 / M' ) BUAH 2,000.0057 Cat Besi / Kayu "Bee Brand" KG 35,000.0058 Cat Kayu KG 75,000.0059 Cat Besi KG 35,000.0060 Cat Tembok ( Shintex ) KG 47,500.0061 Cat Tembok Spektrum KG 125,000.0062 Dempul kayu KG 20,000.0063 Batang 7,500.0064 Batang 25,000.0065 Dina Bolt bh 2,000.0066 Engsel Jendela Psg 12,500.0067 Engsel Pintu Biasa Psg 18,900.0068 BUAH 16,250.0069 BUAH 13,450.0070 Fiber glass gelombang 180 x 0,8 Lbr 63,850.0071 Fiber glass plat lebar 1 M M' 43,700.0072 Flincote Kg 19,700.0073 Floor Drain / Saringan pembuang pada lantai KM/WC BUAH 19,500.0074 Formika uk. Pintu Lbr - 75 Formtie / penjaga jarak bekisting / spacer BUAH 3,300.00 76 Genteng beton abu-2 (isi 9 bh / m2 ) 74,250.0077 Genteng beton warna (isi 9 bh / m2 ) 88,600.0078 Genteng Keramik Glazur "KIA" (isi 15 bh / m2), warna muda BUAH 8,400.0079 Genteng Keramik Glazur "KIA" (isi 15 bh / m2), warna tua BUAH 13,150.0080 Genteng type "Morando" Glazur ( isi 20/M2 ) 1550x20 142,000.0081 Genteng Plentong "s"( isi 25/M2 ) 750x25 225,000.0082 Genteng Tipe "Morando" Natural ( isi 20/M2 ) Oven 950x20 155,000.0083 Genteng Kaca 5 mm Buah 14,450.0084 Grefel beton 20 cm BUAH 19,000.0085 Grefel beton 30 cm BUAH 29,000.00

    M3

    M2M2M2M2

    M2

    M3M3M3M2

    Dolken Kayu 8-10/400 cmDolken Kayu Galam 8-10 / 4 m'

    Eternit 1 x 1 m2 t = 4 mm "Jabesmen" / HarflexEternit (saflex) 1 x 1 m2, t = 5 mm

    M2M2

    M2M2M2

  • HARGA BAHAN Page 15

    NO U R A I A N SATUAN HARGA SATUAN (Rp)86 Grendel jendela kuningan Psg 28,750.00

  • HARGA BAHAN Page 16

    NO U R A I A N SATUAN HARGA SATUAN (Rp)87 Grendel jendela biasa Psg 17,500.0088 Grendel pintu kuningan Bh 32,500.0089 Grendel pintu biasa Bh 19,500.0090 Glass block Bh 35,000.0091 Gypsum uk. 1,2 x 2,4, tebal 9 mm Lbr 85,000.0092 Hak angin kuningan Psg 29,400.0093 Hak angin biasa Psg 6,500.0094 Hard flex uk. 0,5 x 2 M LBR 21,700.0095 Hard flex 0,35 mm 1,22 x 2,44 m, kalsiboard ( tahan api ) LBR 92,650.0096 Hotmix jadi + alat besar, tenaga dan bahan bakar ton 90,500.00 97 Injuk KG 18,950.0098 Jendela Nako (+ Tralis ) BUAH 43,550.0099 Kaca bening 3 mm 97,000.00

    100 Kaca bening 5 mm 130,000.00101 Kaca ryban 5 mm 115,000.00102 Kaca panasap T 5 mm 185,000.00103 Kaca panasap T 10mm 350,000.00104 Kaca es 5 mm 145,000.00105 Kaca Doorsafe 10 mm 375,000.00106 Kalsi Boad 120x240 Tebal 4mm lbr 95,000.00107 Kalsi Boad 120x240 Tebal 8mm lbr 170,000.00108 Kawat Beton KG 22,000.00109 Kawat Bronjong 4 mm ( Galvanis ) KG 40,000.00110 Kawat duri ( 1rol = 40 m ) M' 3,600.00111 Kawat Las KG 17,550.00112 Kawat Las Listrik RD 26 KG 22,400.00113 Kawat Las Listrik RB 26 KG 24,500.00114 Kayu bakar 216,350.00115 Kayu Balok Kelas I 7,900,000.00116 Kayu Balok Kelas II 2,850,000.00117 Kayu Balok Kelas III 1,850,000.00118 Kayu Punak Kalimantan 7,566,000.00119 Kayu Begesting 1,750,000.00120 Kayu reng 3/4 Meranti Batu 5,050,000.00121 Kayu reng 2/3 Meranti Batu 4,896,200.00122 Kayu stoot ( bambu ), 5 m Btg 11,400.00123 Keramik 10/40,warna bh 3,700.00124 Keramik 20/25, warna 57,000.00125 Keramik 20/20, anti slip ( u/lantai Km/wc) 52,000.00126 Keramik 10/20, Border bh 3,500.00127 Keramik 20/20, warna 52,900.00128 Keramik 30/30 (putih polos) 49,250.00129 Keramik 30/30, warna 60,000.00130 Keramik 40/40, (putih polos) 54,800.00131 Keramik 40/40, warna 70,000.00132 Keramik Granito M2 265,000.00133 Kerikil sungai/Manggaran uk. 0,5 - 1 cm 375,000.00134 Kloset duduk / Monoblok "INA", Putih (tanpa pemblias) Bh 750,000.00135 Kloset duduk / Monoblok "INA", Warna Tua (tanpa pembilas) Bh 887,100.00136 Kloset duduk / Monoblok + pembilas otomatis "INA", warna tua Bh 2,582,800.00137 Kloset duduk / Monoblok + pembilas otomatis "INA", warna putih Bh 2,500,000.00138 Kloset jongkok INA, warna tua Bh 295,000.00139 Kloset jongkok INA, warna muda Bh 275,000.00140 Kloset jongkok Traso dicat Bh 120,950.00141 Bh 55,000.00142 Kuas 3" Bh 12,500.00143 Kuas 2" Bh 8,500.00144 Kunci tanam 2 slag Union Bh 125,000.00145 Lampu bohlam 40 watt "Philip" Bh 25,000.00146 Lampu TL 20 watt ( komplit ) Travo Sinar Set 125,000.00

    M2M2M2M2M2M3M2

    M3M3M3M3M3M3M3M3

    M2M2

    M2M2M2M2M2

    M3

    Kran 1/2" onda

  • HARGA BAHAN Page 17

    NO U R A I A N SATUAN HARGA SATUAN (Rp)147 Lem kayu Fox KG 32,500.00148 Lem Kuning ( Aica Aibon ) KG 57,600.00149 Lem Putih ( Fox ) KG 38,550.00150 Lempengan Rumput Biasa 26,200.00151 Lempengan Rumput Jepang / Rumput Golf / Rumput Gajah 55,000.00152 List Kayu Profil M' 9,500.00153 List Gypsum Profil panjang 3m bh 25,000.00154 Melamik KG 30,000.00155 Melamik ( lapisan ) uk. 0,9 x 2,1 LBR 122,000.00156 Menie Besi (Payung warna hijau) KG 33,500.00157 Menie Besi ( Nippon ), zinchcromate KG 47,600.00158 Menie kayu KG 18,000.00159 Metal Stut 76 mm m' 80,000.00160 Minyak aspal Lt 9,900.00161 Minyak Bekisting Lt 11,500.00162 Minyak Cat Ltr 25,000.00163 Minyak pelumas Lt 45,000.00164 Minyak tanah Lt 10,000.00165 Multiplek 4 mm uk. 8" x 4" Lbr 73,000.00166 Multiplek 12 mm uk. 8" x 4 " Lbr 185,000.00167 Kg 6,900.00168 Oker Putih Kg 8,050.00169 Oker Warna Kg 10,250.00170 Paku KG 16,000.00171 Paku Pancing KG 20,000.00172 Paku Skrup Bh 25,000.00173 Papan Meranti Batu ( 2 x 20 x 400 ) 5,287,700.00174 Papan Meranti Batu ( 2 x 25 x 400 ) 5,426,850.00175 Papan bangkirai ( 2 x 20 x 400 ) BH 56,000.00176 Papan bangkirai ( 2 x 25 x 400 ) 9,044,800.00177 Papan bangkirai ( 2 x 30 x 400 ) 8,364,400.00178 Papan Cetak (kayu pinus) uk 2 x 20 x 200 2,087,250.00179 Papan kayu Kelas I 7,800,000.00180 Papan kayu Kelas II 2,850,000.00181 Papan kayu Kelas III 1,850,000.00182 Pas. Kanstin 15 x 20 x 30 x 50 M' 80,000.00183 Pas. Kanstin 10 x 15 x 30 x 50 M' 68,050.00184 Pas. Kanstin 10 x 20 x 50 M' 41,850.00185 Pasir beton 120,000.00186 Pasir Pasang 115,000.00187 Pasir Halus 120,000.00188 Pasir Urug 120,000.00189 Paving Block Grass blok (KW 1) 100,000.00190 Paving Block type Holland natural 8 cm (K 200 ) warna 95,000.00191 Paving Block type Holland natural 8 cm (K 200 ) 95,000.00192 Paving Block warna type Hexagonal tebal 5 cm (KW 1) 95,000.00193 Paving Block warna type Holland natural 6 cm (K 175 ) 95,000.00194 Paving Block warna type Holland natural 8 cm (K 200 ) 95,000.00195 P C ( 50 Kg ) ZAK 70,000.00196 PC Putih ( 40 kg / Zak ) ZAK 110,000.00197 P C ( 50 Kg ) (Harga DO = 160 zak) ZAK 70,000.00198 Pipa Besi 1" t = 2 mm M' 45,000.00199 Pipa Besi 1/2" t = 2 mm M' 15,000.00200 Pipa Besi 2" t = 2 mm M' 55,000.00201 Pipa Besi 3" t = 3 mm M' 65,000.00202 Pipa Besi 3/4" t = 2 mm M' 30,000.00203 Pipa Besi 4" t = 3 mm M' 95,000.00204 Pipa Beton 1/2 20 cm ( Buis Beton ) M' 89,000.00205 Pipa Beton 30 cm ( Buis Beton ) M' 105,000.00206 Pipa Beton 40 cm ( Buis Beton ) M' 125,000.00

    M2M2

    Mur + Baut 1/2 "

    M3M3

    M3M3M3M3M3M3

    M3M3M3M3M2M2M2M2M2M2

  • HARGA BAHAN Page 18

    NO U R A I A N SATUAN HARGA SATUAN (Rp)207 Pipa Beton 60 cm ( Buis Beton ) M' 152,000.00208 Pipa Beton 100 cm ( Buis Beton ) M' 225,000.00209 Pipa Galvanis 1" t = 2 mm M' 65,000.00210 Pipa Galvanis 1/2" t = 2 mm M' 25,000.00211 Pipa Galvanis 2" t = 2 mm M' 75,000.00212 Pipa Galvanis 3" t = 3 mm M' 90,000.00213 Pipa Galvanis 3/4" t = 2 mm M' 40,000.00214 Pipa Galvanis 4" t = 3 mm M' 105,000.00215 Pipa PVC 1" ( AW ) ex Wavin M' 8,750.00216 Pipa PVC 1/2" ( AW ) ex Wavin M' 5,000.00217 Pipa PVC 1 1/4" ( AW ) ex Wavin M' 11,250.00218 Pipa PVC 1 1/2" ( AW ) ex Wavin M' 12,500.00219 Pipa PVC 2"( AW ) ex Wavin M' 13,875.00220 Pipa PVC 2 1/2"( AW ) ex Wavin M' 17,500.00221 Pipa PVC 3" ( AW ) ex Wavin M' 21,250.00222 Pipa PVC 3/4" ( AW ) ex Wavin M' 6,250.00223 Pipa PVC 4" ( AW ) ex Wavin M' 31,250.00224 Pipa PVC ( hitam ) 4" M' 38,750.00225 Pintu Aluminium ( 1,8 x 0,65 ) Set 1,250,000.00226 Plamur Kayu KG 22,000.00227 Plamur tembok KG 19,000.00228 Plitur Jadi ltr 37,000.00229 Plat alumunium 0,5 mm 89,150.00230 Plat alumunium 10 mm 125,000.00231 Plat alumunium ( Aluminium Sheet ) 0,3 mm 106,550.00232 Plat alumunium unt lap. pintu (1x2) tebal 0,3 mm LBR 127,450.00233 Plywood 3 mm uk. 0,9 x 2,2 m LBR 96,550.00234 Plywood 4 mm LBR 103,500.00235 Plywood 9 mm uk. 1,2 x 2,4 m LBR 155,000.00236 Pompa air Nasional 125 watt (dlm negeri), biasa Bh 450,000.00237 Pompa air Nasional 125 watt (dlm negeri), otomatis Bh 650,000.00238 Profil Kaca M' 15,000.00239 Reng kayu Bengkirai 3/5 4,313,650.00240 Reng Kayu Kempas 3,757,050.00241 Reng Kayu Meranti Batu 2/3 3,478,750.00242 Rol Cat Bh 15,000.00243 Reservoir (Tangki air) Stainless + Kaki merk "Kettler" 1000 Lt Buah 4,226,400.00244 Roster Bh 30,000.00245 Sealent Tube 30,000.00246 Seal Tape Bh 2,000.00247 Skrup Fixer Bh 2,000.00248 Seng BJLS 25 Lbr 50,000.00249 Seng BJLS 30 Lbr 57,000.00250 Seng BJLS 30, Uk. 90 cm M' 52,000.00251 Seng Gelombang ( 210 x 80 x 0.2 cm ) lbr 75,000.00252 Seng Gelombang 3' - 6' ( 90 x 180 x 0.2 cm ) lbr 65,000.00253 Seng glb BJLS 30 lbr 80,000.00254 Seng plat 3' x 6' ( 90 cm x 180 cm ) bjls 28 lbr 60,000.00255 Seng Plat BJLS 20 Lebar 90 24,400.00256 Seng Plat BJLS 30 lebar 90 25,000.00257 Shear Connector Ls 14,000.00 258 Sirlak Kg 127,450.00259 Sirtu 99,700.00260 Sirtu Asli 125,600.00261 Sirtu Dontu 99,700.00262 Solar Ltr 8,500.00 263 Spiritus Ltr 15,450.00264 Tanah urug pilihan 95,000.00 265 Teakwood 0,9 x 2,1 ,t = 3 mm Lbr 120,450.00266 Teakwood 0,9 x 2,1 t = 4 mm Lbr 127,450.00

    M2M2M2

    M3M3M3

    M2M2

    M3M3M3

    M3

  • HARGA BAHAN Page 19

    NO U R A I A N SATUAN HARGA SATUAN (Rp)267 Teakwood 1,2 x 2,4 t = 4 mm Lbr 155,250.00268 Tegel abu-abu 20/20 Bh 2,700.00269 Tegel abu-abu 30/30 Bh 6,050.00270 Tegel Warna 20/20 Bh 3,000.00271 Tegel Warna 30/30 Bh 6,900.00272 Tempat Sabun ( INA ) Bh 56,900.00273 Tepung Gypsum KG 25,000.00274 Terpentin ltr 27,000.00275 Triplek 1,2 x 2,4 ,T = 2.7 mm LBR 40,000.00276 Triplek 1,2 x 2,4 ,T = 3.6 mm LBR 58,500.00277 Triplek 1,2 x 2,4 ,T = 5 mm LBR 80,000.00278 Triplek 0,9 x 2,1 ( uk. Pintu ), t = 4mm LBR 61,750.00279 Triplek 0,9 x 2,1 ( uk. Pintu ), t = 3mm LBR 49,000.00280 Urinoir "KIA" Bh 1,950,000.00281 Usuk ky. Bangkirai ( Ikat ) 5/7 4,313,650.00282 Usuk ky. Bangkirai ( Lepas ) 7,931,550.00283 Usuk ky. Kempas ( Ikat ) 3,757,050.00284 Usuk ky. Punak Sumatra ( Ikat ) - 285 Usuk ky. Kempas ( Lepas ) 5,426,850.00286 Usuk ky. Punak Sumatra ( Lepas ) - 287 Usut ky. Meranti Batu ( Ikat ) 3,478,750.00288 Usut ky. Meranti Batu ( Lepas ) 650,000.00289 Wastafel Bh 880,000.00290 Wiremesh M6 35,750.00291 Wood Filler ( INFRA ) Kg 35,750.00292 Profil Bingkai Pintu Aluminium M' 75,000.00 293 Profil kusen aluminium 4" M' 125,000.00

    Asesoris pintu294 PT21/Fixed top pin bh 30,000.00 294 PT20/Top patch fitting bh 180,000.00 294 PT10/Bottom patch fitting bh 180,000.00 294 FH84/Floor hinge bh 645,000.00 294 US10/ Bottom lock fitting + cylinder bh 275,000.00 294 P64.11 Handle ps 600,000.00 294 Stiker sand balst 170,000.00

    M3M3M3M3M3M3M3M3

    M2

    M2

  • ANALISA Page 20

    ANALISA HARGA SATUAN PEKERJAAN UNTUK PERENCANAAN TAHUN ANGGARAN 2009

    NO URAIAN KOEF SAT HARGA SAT JUMLAH1 2 3 4 5 6=(3x5)

    An.001 HSPKTukang kayu 0.0100 org 92,400.00 924.00 ###Pekerja 0.0200 org 80,000.00 1,600.00 Peralatan 0.5000 lot 3,324.00 1,662.00 1000 * 1,15Jumlah 4,186.00 Jumlah Dibulatkan 4,186.00

    An.002 SNIBahan

    1.2500 batang 7,500.00 9,375.00 Balok Kayu Kelas III 0.1814 m3 1,850,000.00 335,590.00 Besi Strip 1.1000 kg 18,250.00 20,075.00 Semen Portland 0.7000 zak 70,000.00 49,000.00 Pasir Pasang 0.1500 m3 115,000.00 17,250.00 Pasir Beton 0.1000 m3 120,000.00 12,000.00 Koral Beton 0.1500 m3 250,000.00 37,500.00 Bata Merah 30.0000 buah 900.00 27,000.00 Seng Plat 0.2500 lembar 25,000.00 6,250.00 Jendela Nako + tralis 0.2000 buah 43,550.00 8,710.00 Kaca Polos 0.0800 m3 97,000.00 7,760.00 Kunci Tanam 0.1500 buah 125,000.00 18,750.00 Plywood 3 mm uk. 0,9 x 2,2 m 0.0600 lembar 96,550.00 5,793.00 Tenaga Jumlah (1) 555,053.00 Tukang kayu 2.0000 org 92,400.00 184,800.00 Tukang batu 1.0000 org 92,400.00 92,400.00 Pekerja 2.0000 org 80,000.00 160,000.00 Kepala Tukang 0.3000 org 108,000.00 32,400.00 Mandor 0.0500 org 108,800.00 5,440.00

    Jumlah (2) 475,040.00 Jumlah Jumlah (1)+(2) 1,030,093.00 Jumlah Dibulatkan 1,030,093.00 SEWA KANTOR SEMENTARA 25 % 257,523.25

    An.003 1 M1 PEK. PASANG BOUWPLANK HSPKKayu Meranti Batu 0.0100 1,750,000.00 17,500.00 Paku 5-7 0.0380 kg 16,000.00 608.00 Ongkos pasang 0.1550 ls 11,450.00 1,774.75 12000 * 1,15Jumlah 19,882.75 Jumlah Dibulatkan 19,882.00

    An.003a 1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK SNIBahan

    0.0120 3,478,750.00 41,745.00 Paku Biasa 2" - 5" 0.0200 kg 16,000.00 320.00

    0.0070 5,287,700.00 37,013.90 Tenaga Jumlah (1) 79,078.90 Tukang kayu 0.1000 org 92,400.00 9,240.00 Pekerja 0.1000 org 80,000.00 8,000.00 Kepala Tukang Kayu 0.0100 org 108,000.00 1,080.00 Mandor 0.0050 org 92,400.00 462.00

    Jumlah (2) 18,782.00 Jumlah Jumlah (1)+(2) 97,860.90 Jumlah Dibulatkan 97,860.00

    1 M2 PEK. PENGUKURAN KEMBALI (SITE)

    1 M2 PEMBUATAN KANTOR SEMENTARA

    Dolken Kayu 8-10/400 cm

    m3

    Kayu 5/7 (Usuk / Meranti Batu ) m3

    Kayu Papan 3/20 (Meranti Batu) m3

  • ANALISA Page 21

    NO URAIAN KOEF SAT HARGA SAT JUMLAH1 2 3 4 5 6=(3x5)

    An.004 1 M1 PAGAR PENGAMAN PROYEK TINGGI 180 cm HSPKSeng Gelombang 3' - 6' ( 90 x 180 cm ) 1.2500 lbr 65,000.00 81,250.00 Kayu ( Usuk Meranti Batu ) 0.0360 3,478,750.00 125,235.00 Paku 5-7 0.2000 kg 16,000.00 3,200.00 Pengecatan cat minyak 2 x bag. Luar (2/3 A079) 1.8000 44,678.33 80,421.00 Ongkos pasang 0.2000 ls 21,750.00 4,350.00 20000*1,15Jumlah 294,456.00 Jumlah Dibulatkan 294,456.00

    An.005 1 M' PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M SNIBahan

    1.2500 batang 7,500.00 9,375.00 Semen Portland 0.0500 Zak 70,000.00 3,500.00 Seng Gelombang 3' - 6' ( 90 x 180 cm ) 1.2500 lembar 65,000.00 81,250.00 Pasir Beton 0.0050 m3 120,000.00 600.00 Koral Beton 0.0090 m3 250,000.00 2,250.00 Kayu Balok kelas III 0.0720 m3 1,850,000.00 133,200.00 Paku Biasa 2" - 5" 0.0600 kg 16,000.00 960.00 Meni Besi 0.4500 liter 33,500.00 15,075.00 Tenaga Jumlah (1) 246,210.00 Tukang Kayu 0.2000 org 92,400.00 18,480.00 Pekerja 0.4000 org 80,000.00 32,000.00 Kepala Tukang Kayu 0.0200 org 108,000.00 2,160.00 Mandor 0.0200 org 108,800.00 2,176.00

    Jumlah (2) 54,816.00 Jumlah Jumlah (1) + (2) 301,026.00 Jumlah Dibulatkan 301,026.00 Sewa Pagar Sementara 50% 150,513.00

    An.006 SNIPekerja 0.4000 org 80,000.00 32,000.00 Tukang Gali 0.0000 org 92,400.00 0.00 Kepala Tukang 0.0000 org 92,400.00 0.00 Mandor 0.0400 org 108,800.00 4,352.00 Jumlah 36,352.00 Jumlah Dibulatkan 36,352.00

    An.007 SNIPekerja 0.5260 org 80,000.00 42,080.00 Tukang Gali 0.0000 org 0.00 Kepala Tukang 0.0000 org 0.00 Mandor 0.0520 org 108,800.00 5,657.60 Jumlah 47,737.60 Jumlah Dibulatkan 47,737.00

    An.008 SNIPekerja 0.7350 org 80,000.00 58,800.00 Tukang Gali 0.0000 org 92,400.00 0.00 Kepala Tukang 0.0000 org 108,000.00 0.00 Mandor 0.0730 org 10