rab new okt 14 analisa
TRANSCRIPT
-
8/10/2019 Rab New Okt 14 Analisa
1/24
KEGIATAN : REVITALISASI SARPRAS
PEKERJAAN : REHABILITASI SD NEGER
LOKASI : KECAMATAN KEMBARAN
BIAYA : Rp.
TAHUN ANGGARAN : 2012
NOJENIS
PEKERJAAN
I. PEKERJAAN PERSIAPAN
II. PEKERJAAN TANAH DAN PASIR
III. PEKERJAAN PASANGAN DAN PLESTERAN
IV. PEKERJAAN BETON
V. PEKERJAAN KAYU DAN ATAP
VI. PEKERJAAN KUNCI DAN KACA
VII. PEKERJAAN LANTAI
VIII. PEKERJAAN PENGECATAN
IX. PEKERJAAN INSTALASI LISTRIK
JUMLAH TOTAL PEKERJAAN
PPN 10%
JUMLAH TOTAL
JUMLAH DIBULATKAN
Purwokerto, 19 September 201
CV. WAHANA
S U D A R Y O
Direktur
REKAPITULASI DAFTAR KUANTITAS DAN
TERBILANG :
-
8/10/2019 Rab New Okt 14 Analisa
2/24
WAJAR DIKDAS
I KARANGSOKA
JUMLAH TOTAL
( Rp. )
1,980,040.00
37,736.22
10,554,500.48
20,346,490.95
126,100,867.50
3,074,472.00
25,077,645.10
13,463,430.42
3,044,500.00
203,679,682.66
20,367,968.27
224,047,650.93
224,047,000.00
2
HARGA
-
8/10/2019 Rab New Okt 14 Analisa
3/24
KEGIATAN : REVITALISASI SARPRAS WAJAR DIKDAS
PEKERJAAN : REHABILITASI SD NEGERI KARANGSOKA
LOKASI : KECAMATAN KEMBARAN
BIAYA : Rp.
TAHUN ANGGARAN : 2012
NO JENIS PEKERJAAN ANALISAHARGA SATUAN
( Rp. )
JML. HARGA
( Rp. )
I. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bouwplank k.y tahun DP 1.000 unit 500,000.00 500,000.00
2 Membersihkan lapangan DP 1.000 unit 450,000.00 450,000.00
3 Pembuatan bak adukan uk. ( 40x50x20 ) cm ky. tahun SNI - A.6.10 1.000 bh 112,190.00 112,190.00
4 Pembuatan steger dari bambu SNI - A.6.11 20.000 M 30,892.50 617,850.00
5 Pengadaan air kerja DP 1.000 unit 300,000.00 300,000.00
II. PEKERJAAN TANAH DAN PASIR
1 Galian tanah biasa sedalam 1 m SNI - B.6.1 0.720 M 31,500.00 22,680.00
2 Urugan kembali SNI - B.6.9 0.390 M 10,498.00 4,094.22
3 Urugan pasir SNI - B.6.11 0.070 M 156,600.00 10,962.00
III. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan pondasi batu kali 1 PC : 3 Kp : 10 Ps SNI - C.6.7 0.260 M 478,055.00 124,294.30
2 Pasangan batu merah tb. 1/2 bata 1 PC : 3 Kp : 10 PP SNI - D.6.13 72.090 M 77,850.00 5,612,206.50
3 Plesteran 1 PC : 3 PP tb. 1,5 cm SNI - E.6.3 35.500 M 36,981.40 1,312,839.70
4 Plesteran 1 PC : 3 KP : 10 PP tb. 1,5 cm SNI - E.6.10a 144.180M
24,311.00 3,505,159.98
IV. PEKERJAAN BETON
1 Membuat beton cor 1 PC : 2 Ps : 3 Kr SNI G.6.13 4.858 M 863,175.00 4,193,304.15
2 Pembesian dengan besi beton polos SNI G.6.25 577.310 kg 14,269.50 8,237,925.05
3 Cetakan kayu tahun 1/2.BOW - F.8 90.310 M 72,925.00 6,585,856.75
4 Kolom praktis beton bertulang (11 x 11) cm SNI - G.6.35 21.000 M' 63,305.00 1,329,405.00
V. PEKERJAAN KAYU DAN ATAP
1 Pas. kusen pintu dan jendela kayu kruing SNI - F.6.2b 1.173 M 9,660,000.00 11,331,180.00
2 Jendela kaca 5 mm kayu kruing sederhana tb. 3 cm BOW - F.36p 9.000 M 403,950.00 3,635,550.00
3 Pas. jalusi mati kusen kayu kruing SNI - F.6.8c 6.720 M 584,675.00 3,929,016.00
4 Pas. konstruksi kuda-kuda kayu kruing SNI - F.6.14c 1.051 M 8,884,500.00 9,337,609.50
5 Konstruksi gording, kayu kruing SNI - F.6.16b 1.272 M 8,444,500.00 10,741,404.00
6 SNI - F.6.18b 300.560 M 97,490.00 29,301,594.40
7 Pas. lisplank kayu kruing uk. 2 ( 2 x 20 ) cm SNI - F.6.29c 71.400 M' 75,050.00 5,358,570.00
8 Pas. atap genteng plentong kecil SNI - H.6.1 300.560 M 61,500.00 18,484,440.00
9 Pas. atap genteng nok plentong/kodok SNI - H.6.4 22.100 M' 64,600.00 1,427,660.00
10 Pintu panil multiplek 9 mm rk. Ky. kruing ( tb. 3,5 cm ) BOW - F.36l 7.560 M 536,660.00 4,057,149.60
11 Pas. langit2 eternit ( 1,00 x 1,00 ) m rk. Ky. meranti SNI - I.6.20c 244.300 M 104,195.00 25,454,838.50
12 Pas. lis langit-langit kayu kruing SNI - I.6.19a 209.350 M' 14,530.00 3,041,855.50
VI. PEKERJAAN KUNCI DAN KACA
1 Pasang engsel pintu SNI - K.6.5 15.000 bh 20,620.00 309,300.00
2 Pasang engsel jendela kupu-kupu SNI - K.6.6 38.000 bh 19,120.00 726,560.00
3 Pasang kait angin model lipat SNI - K.6.9 38.000 bh 19,120.00 726,560.00
4 Pasang kunci selot SNI - K.6.11 3.000 bh 129,160.00 387,480.00
5 Pasang kaca tebal 5 mm SNI - K.6.17 5.600 M 131,620.00 737,072.006 Pasang grendel pintu Ls 5.000 bh 9,000.00 45,000.00
7 Pasang grendel jendela Ls 15.000 bh 7,500.00 112,500.00
8 Pasang tarikan jendela Ls 15.000 bh 2,000.00 30,000.00
VII. PEKERJAAN LANTAI
1 Pas. lantai keramik uk. ( 30 x 30 ) cm (Klas A) SNI - L.6.47e 161.380 M 155,395.00 25,077,645.10
SUB TOTAL PEKERJAAN TANAH DAN PASIR
SUB TOTAL PEKERJAAN PASANGAN DAN PLESTERAN
SUB TOTAL PEKERJAAN BETON
SUB TOTAL PEKERJAAN KAYU DAN ATAP
SUB TOTAL PEKERJAAN KUNCI DAN KACA
SUB TOTAL PEKERJAAN LANTAI
KUANTITAS
DAFTAR KUANTITAS DAN HARGA
Pas. kaso dan reng genteng (kodok, plentong, vlamsdan sejenisnya) kayu kruing
SUB TOTAL PEKERJAAN PERSIAPAN
-
8/10/2019 Rab New Okt 14 Analisa
4/24
NO JENIS PEKERJAAN ANALISAH. SATUAN
( Rp. )
JML. HARGA
( Rp. )
VIII. PEKERJAAN PENGECATAN
1 SNI - M.6.8 112.000 M 27,510.00 3,081,120.00
2 SNI - M.6.14c 71.540 M 11,439.50 818,381.83
3 SNI - M.6.15c 436.720 M 8,563.00 3,739,633.36
4 Pengecatan plapond 3x (sek. Decolith) BOW - K.6+23a 244.300 M 23,840.75 5,824,295.23
IX. PEKERJAAN INSTALASI LISTRIK
1 Pasang instalasi titik cahaya / lampu Ls 13.000 ttk 135,000.00 1,755,000.00
2 Pasang instalasi stop kontak Ls 4.000 ttk 135,000.00 540,000.00
3 Saklar ganda Ls 4.000 bh 25,000.00 100,000.00
4 Saklar tunggal Ls 3.000 bh 18,500.00 55,500.00
5 Stop kontak Ls 4.000 bh 18,500.00 74,000.00
6 Pasang lampu TL 20 watt Ls 10.000 bh 50,000.00 500,000.00
7 Pasang lampu pijar Ls 3.000 bh 8,500.00 20,000.00
JUMLAH TOTAL PEKERJAAN
PPN 10%
JUMLAH TOTAL
JUMLAH DIBULATKAN
Purwokerto, 19 Septembe
CV. WAHANA
S U D A R Y O
Direktur
SUB TOTAL PEKERJAAN PENGECATAN
SUB TOTAL PEKERJAAN INSTALASI LISTRIK
Pengecatan bidang kayu baru (1 lps plamir, 1 lps cat
dasar, 2 lps cat penutup) sek. Avian
Pengecatan tembok baru (1 lps plamir, 1 lps cat dasar, 2
lps cat penutup) sek. Decolith
Pengecatan tembok lama (1 lps cat dasar, 2 lps cat
penutup) sek. Decolith
KUANTITAS
-
8/10/2019 Rab New Okt 14 Analisa
5/24
JML. TOTAL
( Rp. )
1,980,040.00
37,736.22
10,554,500.48 batapp
pb
besi 669.170 9,100.00
kusen 1.173 1.2000 1.408 6,000,000.00
kuda 1.051 1.1000 1.156 6,000,000.00
20,346,490.95 gording 1.272 1.1000 1.399 6,000,000.00
kaso 5/7 300.560 0.0090 2.705 5,750,000.00
reng 2/3 300.560 0.0036 1.082 5,400,000.00
48,049,636.00
4,804,963.60
52,854,599.60
5,046.300pc 50.000 63,000.00
pasir pasang 6.500 90,000.00
pasir beton 2.750 95,000.00
batu 2/3 4.000 153,000.00
bata 5,000.000 500.00
besi 666.581 9,100.00
126,100,867.50 kayu kruing 3.963 6,000,000.00
kaso 5/7 1.930 5,750,000.00
reng 2/3 0.000 5,400,000.00
48,049,636.00
3.963 (1.10)
(8,272.73)(0.00)
3,074,472.00
25,077,645.10
-
8/10/2019 Rab New Okt 14 Analisa
6/24
JML. TOTAL
( Rp. )
13,463,430.42
3,044,500.00
203,679,682.66
20,367,968.27
224,047,650.93
224,047,000.00
r 2012
-
8/10/2019 Rab New Okt 14 Analisa
7/24
6,089,447.00
8,445,600.00
6,936,600.00
8,395,200.00
15,553,980.00
5,842,886.40
51,263,713.40
5,126,371.34
56,390,084.74
3,150,000.00
585,000.00
261,250.00
612,000.00
2,500,000.00
6,065,887.10
23,778,000.00
11,097,500.00
0.00
48,049,637.10
4,804,963.71
52,854,600.81
-
8/10/2019 Rab New Okt 14 Analisa
8/24
KEGIATAN : REVITALISASI SARPRAS WAJAR DIKDAS
PEKERJAAN : REHABILITASI SD NEGERI KARANGSOKA
LOKASI : KECAMATAN KEMBARAN
BIAYA : Rp.
TAHUN ANGGARAN : 2012
1 3 4 5
SNI - A.6.10 BH
Kayu Tahun 0.0360 M3 2,000,000.00
Paku Biasa ( 2" - 5" ) 0.0800 Kg 20,000.00
Usuk 5/7 1.0000 Btg 20,500.00
Tukang Batu 0.3000 OH 60,000.00
M a n d o r 0.0015 OH 60,000.00
SNI - A.6.11 M2
Bambu diam. 6-8 / 6 m 1.0000 Btg 17,500.00
Tali Ijuk 0.2500 Kg 5,850.00
P e k e r j a 0.2500 OH 40,000.00
Tukang Kayu 0.0170 OH 60,000.00
Kepala Tukang 0.0020 OH 65,000.00
M a n d o r 0.0130 OH 60,000.00SNI - B.6.1 M3
P e k e r j a 0.7500 OH 40,000.00
M a n d o r 0.0250 OH 60,000.00
SNI - B.6.9 M3
P e k e r j a 0.2500 OH 40,000.00
M a n d o r 0.0083 OH 60,000.00
SNI - B.6.11 M3
Pasir urug 1.2000 M3 120,000.00
P e k e r j a 0.3000 OH 40,000.00
M a n d o r 0.0100 OH 60,000.00
SNI - C.6.7 M3
Batu Kali Belah 1.2000 M3 150,000.00Portland Cement 61.0000 Kg 1,400.00
Kapur Padam 0.1470 M3 200,000.00
Pasir Pasang 0.4920 M3 140,000.00
P e k e r j a 1.5000 OH 40,000.00
Tukang Batu 0.7500 OH 60,000.00
Kepala Tukang 0.0750 OH 65,000.00
M a n d o r 0.0750 OH 60,000.00
SNI - D.6.13 M2
Batu Merah (5x11x22cm) 70.0000 Bh 600.00
Portland Cement 4.5000 Kg 1,400.00
Pasir Pasang 0.0500 M3 140,000.00
Kapur pasang 0.0150 M3 200,000.00
P e k e r j a 0.3000 OH 40,000.00
Tukang Batu 0.1000 OH 60,000.00
Kepala Tukang 0.0100 OH 65,000.00
M a n d o r 0.0150 OH 60,000.00
SNI - E.6.3 M2
Portland Cement 7.7760 Kg 1,400.00
Pasir Pasang 0.0230 M3 140,000.00
P e k e r j a 0.3000 OH 40,000.00
Tukang Batu 0.1500 OH 60,000.00
Kepala Tukang 0.0150 OH 65,000.00
M a n d o r 0.0150 OH 60,000.00
ANALISA HARGA SATUAN PEKERJAAN
SAT.
Pemb. Bak Adukan Uk. (40x50x20) cm Ky. Tahun
Pembuatan Steger dari Bambu
HRG SAT(Rp)
Pas. Batu Merah tb. 1/2 bata 1 PC : 3 Kp : 10 PP
Plesteran 1 PC : 3 PP tb. 1,5 cm
Urugan Pasir
Pas. Pondasi Batu Belah 1 PC : 3 KP :10 PP
ANALISA KOEF.JENIS & URAIAN PEKERJAN
2
Galian Tanah Biasa Sedalam 1 meter
Urugan Kembali
-
8/10/2019 Rab New Okt 14 Analisa
9/24
1 3 4 5
SNI - E.6.10a M2
Portland Cement 1.8400 Kg 1,400.00Kapur Pasang 0.0060 M3 200,000.00
Pasir Pasang 0.0140 M3 140,000.00
P e k e r j a 0.2000 OH 40,000.00
Tukang Batu 0.1500 OH 60,000.00
Kepala Tukang 0.0150 OH 65,000.00
M a n d o r 0.0100 OH 60,000.00
SNI - F.6.2b M3
Kayu Kruing Balok 1.2000 M3 6,800,000.00
Paku 10 cm 1.2500 Kg 20,000.00
Lem Kayu 1.0000 Kg 20,000.00
P e k e r j a 6.0000 OH 40,000.00
Tukang Kayu 18.0000 OH 60,000.00
Kepala Tukang 1.8000 OH 65,000.00
M a n d o r 0.3000 OH 60,000.00
SNI - F.6.8c M2
Papan Kruing 0.0600 M3 7,000,000.00
Paku 1 cm - 2,5 cm 0.1500 kg 22,500.00
P e k e r j a 0.6700 OH 40,000.00
Tukang Kayu 2.0000 OH 60,000.00
Kepala Tukang 0.2000 OH 65,000.00
M a n d o r 0.0250 OH 60,000.00
SNI - F.6.14c M3
Kayu Kruing Balok 1.1000 M3 6,800,000.00
Besi strip tebal 5 mm 15.0000 kg 21,500.00
Paku 12 cm 5.6000 Kg 20,000.00
P e k e r j a 4.0000 OH 40,000.00
Tukang Kayu 12.0000 OH 60,000.00
Kepala Tukang 1.2000 OH 65,000.00
M a n d o r 0.2000 OH 60,000.00
SNI - F.6.16b M3
Kayu Kruing Balok 1.1000 M3 6,800,000.00
Besi strip tebal 5 mm 15.0000 kg 21,500.00
Paku 12 cm 3.0000 Kg 20,000.00
P e k e r j a 2.4000 OH 40,000.00
Tukang Kayu 7.2000 OH 60,000.00
Kepala Tukang 0.7200 OH 65,000.00
M a n d o r 0.1200 OH 60,000.00
SNI - F.6.18b M2
Usuk Kruing 5/7 0.0090 M3 6,500,000.00
Reng Kruing (2x3) cm 0.0036 M3 6,400,000.00
Paku 5 cm dan 10 cm 0.2500 Kg 20,000.00
P e k e r j a 0.1000 OH 40,000.00
Tukang Kayu 0.1000 OH 60,000.00
Kepala Tukang 0.0100 OH 65,000.00
M a n d o r 0.0050 OH 60,000.00
SNI - F.6.29c M'
Papan Kruing 0.0086 M3 7,000,000.00
Paku Biasa ( 2" - 5") 0.0600 Kg 20,000.00P e k e r j a 0.1000 OH 40,000.00
Tukang Kayu 0.1000 OH 60,000.00
Kepala Tukang 0.0100 OH 65,000.00
M a n d o r 0.0500 OH 60,000.00
SNI - G.6.13 M3
Portland Cement 336.0000 Kg 1,400.00
Pasir Beton 0.5400 M3 150,000.00
Batu pecah mesin 2/3 cm 0.8100 M3 250,000.00
P e k e r j a 2.0000 OH 40,000.00
Tukang Batu 0.3500 OH 60,000.00
Kepala Tukang 0.0350 OH 65,000.00
2
Plesteran 1 PC : 3 KP : 10 PP tb. 1,5 cm
Pas. Kusen Pintu dan Jendela Kayu Kruing
Konstruksi gording, kayu Kruing
Pas. Kaso dan Reng genteng (kodok, plentong, vlams dan
sejenisnya) Kayu Kruing
Pas. Lisplank Kayu Kruing Uk. 2 ( 2 x 20 ) cm
Membuat Beton Cor 1 PC : 2 Ps : 3 Kr
Pas. Jalusi Mati Kusen Kayu Kruing
Pas. Konstruksi Kuda-kuda Kayu Kruing
ANALISA JENIS & URAIAN PEKERJAN KOEF. SAT. HRG SAT(Rp)
-
8/10/2019 Rab New Okt 14 Analisa
10/24
M a n d o r 0.1000 OH 60,000.00
1 3 4 5
SNI - G.6.25 KgBesi Beton Polos 1.0500 Kg 12,500.00
Kawat Beton ( Bindrat ) 0.0150 Kg 25,000.00
P e k e r j a 0.0070 OH 40,000.00
Tukang Besi 0.0070 OH 60,000.00
Kepala Tukang 0.0007 OH 65,000.00
M a n d o r 0.0004 OH 60,000.00
SNI - G.6.35 M'
Kayu Tahun 0.0020 M3 2,000,000.00
Paku Biasa (2" - 5") 0.0100 Kg 20,000.00
Besi Beton Polos 3.0000 Kg 12,500.00
Kawat Beton ( Bindrat ) 0.0450 Kg 25,000.00
Portland Cement 4.0000 Kg 1,400.00
Pasir Beton 0.0060 M3 150,000.00
Batu Pecah mesin 2/3cm 0.0090 M3 250,000.00
P e k e r j a 0.1800 OH 40,000.00
Tukang Batu 0.0200 OH 60,000.00
Tukang Kayu 0.0200 OH 60,000.00
Tukang Besi 0.0200 OH 60,000.00
Kepala Tukang 0.0060 OH 65,000.00
M a n d o r 0.0090 OH 60,000.00
SNI - H.6.1 M2
Genteng plentong 25.0000 Bh 2,000.00
P e k e r j a 0.1500 OH 40,000.00
Tukang Kayu 0.0750 OH 60,000.00
Kepala Tukang 0.0080 OH 65,000.00
M a n d o r 0.0080 OH 60,000.00
SNI - H.6.4 M'
Genteng Bubung Plentong/Kodok 5.0000 Bh 3,900.00
Portland Cement 8.0000 Kg 1,400.00
Pasir Pasang 0.0320 M3 140,000.00
P e k e r j a 0.4000 OH 40,000.00
Tukang Kayu 0.2000 OH 60,000.00
Kepala Tukang 0.0200 OH 65,000.00
M a n d o r 0.0020 OH 60,000.00
SNI - I.6.19a M'
Lis Kayu 1.1000 M' 8,000.00
Paku Eternit, Lis 0.0100 Kg 22,500.00P e k e r j a 0.0500 OH 40,000.00
Tukang Kayu 0.0500 OH 60,000.00
Kepala Tukang 0.0050 OH 65,000.00
M a n d o r 0.0030 OH 60,000.00
SNI - I.6.20c M2
Usuk Meranti 5/7 0.0120 M3 5,000,000.00
Paku Plafond 0.0600 Kg 20,000.00
Paku Eternit, Lis 0.0100 Kg 22,500.00
Eternit ( 1,00 x 1,00 ) m 1.1000 Lbr 12,500.00
P e k e r j a 0.1800 OH 40,000.00
Tukang Kayu 0.3200 OH 60,000.00
Kepala Tukang 0.0320 OH 65,000.00M a n d o r 0.0090 OH 60,000.00
SNI - K.6.5 BH
Engsel pintu 1.0000 Bh 10,000.00
P e k e r j a 0.0150 OH 40,000.00
Tukang Kayu 0.1500 OH 60,000.00
Kepala Tukang 0.0150 OH 65,000.00
M a n d o r 0.0008 OH 60,000.00
SNI - K.6.6 BH
Engsel Jendela kupu-kupu 1.0000 Bh 8,500.00
P e k e r j a 0.0150 OH 40,000.00
Tukang Kayu 0.1500 OH 60,000.00
Pembesian dengan Besi Beton Polos
2
ANALISA JENIS & URAIAN PEKERJAN KOEF. SAT. HRG SAT(Rp)
Pasang Engsel Pintu
Pasang Engsel Jendela Kupu-kupu
Kolom praktis beton bertulang (11 x 11)cm
Pas. Atap Genteng Plentong Kecil
Pas. Atap Genteng Nok Plentong/Kodok
Pas. Lis Langit-langit Kayu Kruing
Pas. Langit-langit Eternit ( 1,00 x 1,00 ) m Rk. Kayu Meranti
-
8/10/2019 Rab New Okt 14 Analisa
11/24
Kepala Tukang 0.0150 OH 65,000.00
M a n d o r 0.0008 OH 60,000.00
1 3 4 5
SNI - K.6.9 BH
Kait Angin model lipat 1.0000 Bh 8,500.00
P e k e r j a 0.0150 OH 40,000.00
Tukang Kayu 0.1500 OH 60,000.00
Kepala Tukang 0.0150 OH 65,000.00
M a n d o r 0.0008 OH 60,000.00
SNI - K.6.11 BH
Kunci Slot 1.0000 Bh 115,000.00
P e k e r j a 0.0200 OH 40,000.00
Tukang Kayu 0.2000 OH 60,000.00
Kepala Tukang 0.0200 OH 65,000.00
M a n d o r 0.0010 OH 60,000.00
SNI - K.6.17 M2
Kaca bening tb. 5 mm 1.1000 M2 110,000.00
P e k e r j a 0.0150 OH 40,000.00
Tukang Kayu 0.1500 OH 60,000.00
Kepala Tukang 0.0150 OH 65,000.00
M a n d o r 0.0008 OH 60,000.00
SNI - L.6.47e M2
Keramik lantai 30 x 30 cm (Klas A) 11.8700 Bh 6,000.00
Portland Cement 10.0000 Kg 1,400.00
Pasir Pasang 0.0450 M3 140,000.00
Semen Warna 1.5000 Kg 7,000.00
P e k e r j a 0.7000 OH 40,000.00
Tukang Batu 0.3500 OH 60,000.00
Kepala Tukang 0.0350 OH 65,000.00
M a n d o r 0.0350 OH 60,000.00
SNI - M.6.8 M2
Cat meni 0.2000 Kg 21,500.00
Plamir Kayu 0.1500 Kg 18,500.00
Cat dasar ( sek. Avian ) 0.1700 Kg 38,500.00
Cat Penutup ( sek. Avian ) 0.2600 Kg 38,500.00
P e k e r j a 0.0700 OH 40,000.00
Tukang Cat 0.0090 OH 60,000.00
Kepala Tukang 0.0060 OH 65,000.00
M a n d o r 0.0025 OH 60,000.00
SNI - M.6.14c M2
Plamir Tembok 0.1000 Kg 9,000.00
Cat dasar ( sek. Decolith ) 0.1000 Kg 15,000.00
Cat Penutup 2 kali ( sek. Decolith ) 0.2600 Kg 15,000.00
P e k e r j a 0.0200 OH 40,000.00
Tukang Cat 0.0630 OH 60,000.00
Kepala Tukang 0.0063 OH 65,000.00
M a n d o r 0.0025 OH 60,000.00
SNI - M.6.15c M2
Cat dasar ( sek. Decolith ) 0.1200 Kg 15,000.00
Cat Penutup 2 kali ( sek. Decolith ) 0.1800 Kg 15,000.00
P e k e r j a 0.0280 OH 40,000.00
Tukang Cat 0.0420 OH 60,000.00
Kepala Tukang 0.0042 OH 65,000.00
M a n d o r 0.0025 OH 60,000.00
Pasang Kait Angin model lipat
Pasang Kunci Slot
Pasang Kaca tb. 5 mm
Pas. Lantai Keramik uk. ( 30 x 30 ) cm (Klas A)
Pengecatan Bidang Kayu Baru( 1 lps plamir, 1 lps cat dasar, 2
lps cat penutup ) Sek. Avian
Pengecatan Tembok Baru( 1 lps plamir, 1 lps cat dasar, 2 lps
cat penutup ) Sek. Decolith
ANALISA JENIS & URAIAN PEKERJAN KOEF. SAT. HRG SAT(Rp)
2
Pengecatan Tembok Lama ( 1 lps cat dasar, 2 lps cat penutup
) Sek. Decolith
-
8/10/2019 Rab New Okt 14 Analisa
12/24
1 3 4 5
BOW - F.36l M2
Kayu Kruing 0.0180 M3 7,000,000.00
Multiplek 9 mm 0.7000 M2 125,000.00
Tukang Kayu 4.0000 OH 60,000.00
Kepala Tukang 0.4000 OH 65,000.00
P e k e r j a 1.3300 OH 40,000.00
M a n d o r 0.0660 OH 60,000.00
BOW - F.36p M2
Kayu Kruing 0.0120 M3 7,000,000.00
Kaca Bening 5 mm 0.7000 M2 110,000.00
Paku Eternit,Lis 0.0200 Kg 22,500.00
Tukang Kayu 3.0000 OH 60,000.00
Kepala Tukang 0.3000 OH 65,000.00
P e k e r j a 1.0000 OH 40,000.00
M a n d o r 0.0500 OH 60,000.00
BOW - K.6+23a M2
Cat Tembok ( sek. Decolith) 0.4000 Kg 15,000.00
Tukang Cat 0.1875 OH 60,000.00
Kepala Tukang 0.0188 OH 65,000.00
P e k e r j a 0.1250 OH 40,000.00
M a n d o r 0.0062 OH 60,000.00
1/2 BOW - F.8 M2
Kayu Tahun 0.0400 M3 2,000,000.00
Paku Biasa ( 2" - 5") 0.4000 Kg 20,000.00
Tukang Kayu 0.5000 OH 60,000.00
Kepala Tukang 0.0500 OH 65,000.00
P e k e r j a 0.2000 OH 40,000.00
M a n d o r 0.0100 OH 60,000.00
Pekerja Bongkar / Siram 0.4000 OH 40,000.00
Purwokerto, 19 Septemb
CV. WAHANA
S U D A R Y O
Direktur
Pintu Panil Multiplek 9mm Rangka Ky. Kruing ( tb. 3,5 cm )
Jendela Kaca 5 mm Kayu Kruing Sederhana tb. 3 cm
Pengecatan plapond 3x ( sek. Decolith )
Cetakan Beton Kayu Tahun
HRG SAT(Rp)
2
ANALISA JENIS & URAIAN PEKERJAN KOEF. SAT.
-
8/10/2019 Rab New Okt 14 Analisa
13/24
6 = 3 X 5
112,190.00
72,000.00
1,600.00
20,500.00
18,000.00
90.00
30,892.50
17,500.00
1,462.50
10,000.00
1,020.00
130.00
780.0031,500.00
30,000.00
1,500.00
10,498.00
10,000.00
498.00
156,600.00
144,000.00
12,000.00
600.00
478,055.00
180,000.0085,400.00
29,400.00
68,880.00
60,000.00
45,000.00
4,875.00
4,500.00
77,850.00
42,000.00
6,300.00
7,000.00
3,000.00
12,000.00
6,000.00
650.00
900.00
36,981.40
10,886.40
3,220.00
12,000.00
9,000.00
975.00
900.00
HARGA (Rp)
-
8/10/2019 Rab New Okt 14 Analisa
14/24
6 = 3 X 5
24,311.00
2,576.001,200.00
1,960.00
8,000.00
9,000.00
975.00
600.00
9,660,000.00
8,160,000.00
25,000.00
20,000.00
240,000.00
1,080,000.00
117,000.00
18,000.00
584,675.00
420,000.00
3,375.00
26,800.00
120,000.00
13,000.00
1,500.00
8,884,500.00
7,480,000.00
322,500.00
112,000.00
160,000.00
720,000.00
78,000.00
12,000.00
8,444,500.00
7,480,000.00
322,500.00
60,000.00
96,000.00
432,000.00
46,800.00
7,200.00
97,490.00
58,500.00
23,040.00
5,000.00
4,000.00
6,000.00
650.00
300.00
75,050.00
60,200.00
1,200.004,000.00
6,000.00
650.00
3,000.00
863,175.00
470,400.00
81,000.00
202,500.00
80,000.00
21,000.00
2,275.00
HARGA (Rp)
-
8/10/2019 Rab New Okt 14 Analisa
15/24
6,000.00
6 = 3 X 5
14,269.5013,125.00
375.00
280.00
420.00
45.50
24.00
63,305.00
4,000.00
200.00
37,500.00
1,125.00
5,600.00
900.00
2,250.00
7,200.00
1,200.00
1,200.00
1,200.00
390.00
540.00
61,500.00
50,000.00
6,000.00
4,500.00
520.00
480.00
64,600.00
19,500.00
11,200.00
4,480.00
16,000.00
12,000.00
1,300.00
120.00
14,530.00
8,800.00
225.002,000.00
3,000.00
325.00
180.00
104,195.00
60,000.00
1,200.00
225.00
13,750.00
7,200.00
19,200.00
2,080.00540.00
20,620.00
10,000.00
600.00
9,000.00
975.00
45.00
19,120.00
8,500.00
600.00
9,000.00
HARGA (Rp)
-
8/10/2019 Rab New Okt 14 Analisa
16/24
975.00
45.00
6 = 3 X 5
19,120.00
8,500.00
600.00
9,000.00
975.00
45.00
129,160.00
115,000.00
800.00
12,000.00
1,300.00
60.00
131,620.00
121,000.00
600.00
9,000.00
975.00
45.00
155,395.00
71,220.00
14,000.00
6,300.00
10,500.00
28,000.00
21,000.00
2,275.00
2,100.00
27,510.00
4,300.00
2,775.00
6,545.00
10,010.00
2,800.00
540.00
390.00
150.00
11,439.50
900.00
1,500.00
3,900.00
800.00
3,780.00
409.50
150.00
8,563.00
1,800.00
2,700.00
1,120.00
2,520.00
273.00
150.00
HARGA (Rp)
-
8/10/2019 Rab New Okt 14 Analisa
17/24
6 = 3 X 5
536,660.00
126,000.00
87,500.00
240,000.00
26,000.00
53,200.00
3,960.00
403,950.00
84,000.00
77,000.00
450.00
180,000.00
19,500.00
40,000.00
3,000.00
23,840.75
6,000.00
11,250.00
1,218.75
5,000.00
372.00
72,925.00
80,000.00
8,000.00
30,000.00
3,250.00
8,000.00
600.00
16,000.00
er 2012
HARGA (Rp)
-
8/10/2019 Rab New Okt 14 Analisa
18/24
KEGIATAN : REVITALISASI SARPRAS WAJAR DIKDAS
PEKERJAAN : REHABILITASI SD NEGERI KARANGSOKA
LOKASI : KECAMATAN KEMBARAN
BIAYA : Rp.
TAHUN ANGGARAN : 2012
1 SNI - A.6.10 BH Pembuatan Bak Adukan Uk. ( 40x50x20 ) cm Kayu Tahun
2 SNI - A.6.11 M2 Pembuatan Steger dari Bambu
3 SNI - B.6.1 M3 Galian Tanah Biasa Sedalam 1 meter
4 SNI - B.6.9 M3 Urugan Kembali
5 SNI - B.6.11 M3 Urugan Pasir
6 SNI - C.6.7 M3 Pas. Pondasi Batu Belah 1 PC : 3 KP :10 PP
7 SNI - D.6.13 M2 Pas. Batu Merah tb. 1/2 bata 1 PC : 3 Kp : 10 PP
8 SNI - E.6.3 M2 Plesteran 1 PC : 3 PP tb. 1,5 cm
9 SNI - E.6.10a M2 Plesteran 1 PC : 3 KP : 10 PP tb. 1,5 cm
10 SNI - F.6.2b M3 Pas. Kusen Pintu dan Jendela Kayu Kruing
11 SNI - F.6.8c M2 Pas. Jalusi Mati Kusen Kayu Kruing
12 SNI - F.6.14c M3 Pas. Konstruksi Kuda-kuda Kayu Kruing
13 SNI - F.6.16b M3 Konstruksi gording, kayu Kruing
14 SNI - F.6.18b M2 Pas. Kaso dan Reng genteng (kodok, plentong, vlams dan sejenisnya) Kayu Kruing
15 SNI - F.6.29c M' Pas. Lisplank Kayu Kruing Uk. 2 ( 2 x 20 ) cm
16 SNI - G.6.13 M3 Membuat Beton Cor 1 PC : 2 Ps : 3 Kr
17 SNI - G.6.25 Kg Pembesian dengan Besi Beton Polos
18 SNI - G.6.35 M' Kolom praktis beton bertulang (11 x 11)cm
19 SNI - H.6.1 M2 Pas. Atap Genteng Plentong Kecil
20 SNI - H.6.4 M' Pas. Atap Genteng Nok Plentong/Kodok
21 SNI - I.6.19a M' Pas. Lis Langit-langit Kayu Kruing
22 SNI - I.6.20c M2 Pas. Langit-langit Eternit ( 1,00 x 1,00 ) m Rangka Kayu Meranti
23 SNI - K.6.5 BH Pasang Engsel Pintu
24 SNI - K.6.6 BH Pasang Engsel Jendela Kupu-kupu
25 SNI - K.6.9 BH Pasang Kait Angin model lipat
26 SNI - K.6.11 BH Pasang Kunci Slot
27 SNI - K.6.17 M2 Pasang Kaca tb. 5 mm
28 SNI - L.6.47e M2 Pas. Lantai Keramik uk. ( 30 x 30 ) cm (Klas A)
29 SNI - M.6.8 M2 Pengecatan Bidang Kayu Baru( 1 lps plamir, 1 lps cat dasar, 2 lps cat penutup ) Sek. Avian
30 SNI - M.6.14c M2 Pengecatan Tembok Baru( 1 lps plamir, 1 lps cat dasar, 2 lps cat penutup ) Sek. Decolith
31 SNI - M.6.15c M2 Pengecatan Tembok Lama ( 1 lps cat dasar, 2 lps cat penutup ) Sek. Decolith
32 BOW - F.36l M2 Pintu Panil Multiplek 9mm Rangka Kayu Kruing ( tb. 3,5 cm )
33 BOW - F.36p M2 Jendela Kaca 5 mm Kayu Kruing Sederhana tb. 3 cm
34 BOW - K.6+23a M2 Pengecatan plapond 3x ( sek. Decolith )
35 BOW - F.8 M2 Cetakan Beton Kayu Tahun
Purwokerto, 19 September 2
CV. WAHANA
S U D A R Y O
Direktur
NO. ANALISA SAT. URAIAN PEKERJAAN
DAFTAR HARGA SATUAN PEKERJAAN
-
8/10/2019 Rab New Okt 14 Analisa
19/24
HARGA
( Rp. )
112,190.00
30,892.50
31,500.00
10,498.00
156,600.00
478,055.00
77,850.00
36,981.40
24,311.00
9,660,000.00
584,675.00
8,884,500.00
8,444,500.00
97,490.00
75,050.00
863,175.0014,269.50
63,305.00
61,500.00
64,600.00
14,530.00
104,195.00
20,620.00
19,120.00
19,120.00
129,160.00
131,620.00
155,395.00
27,510.00
11,439.50
8,563.00
536,660.00
403,950.00
23,840.75
72,925.00
12
-
8/10/2019 Rab New Okt 14 Analisa
20/24
KEGIATAN : REVITALISASI SARPRAS WAJAR DIKDAS
PEKERJAAN : REHABILITASI SD NEGERI KARANGSOKA
LOKASI : KECAMATAN KEMBARAN
BIAYA : Rp.
TAHUN ANGGARAN : 2012
1 OH
2 OH
3 OH
4 OH
7 OH
8 OH
9 OH
10 OH
1 M3 Pasir Beton
2 M3 Pasir Pasang
3 M3 Pasir Urug
4 M3 Kapur Pasang/Padam
5 M3 Batu Kali Belah
6 M3 Batu Pecah Mesin 2/3 cm
7 Bh Batu Merah (5x11x22cm)
8 Kg Tali Ijuk
9 Zak Portland Cement
10 Kg Portland Cement
11 Kg Pc Warna
12 Kg Besi Beton Polos
13 Kg Bindrat14 Kg Besi strip tebal 5 mm
15 Bh Keramik Lantai 30 x 30 cm Klas A
16 M3 Kayu Albasia
17 M3 Kayu Kruing Balok
18 M3 Usuk Meranti 5/7
19 M3 Usuk Kruing 5/7
20 M3 Papan Kruing
21 M' Lis Kayu Kruing
22 Btg Usuk 5/7 Kayu Tahun P=3 m
23 M3 Reng 2/3 Kayu Kruing
24 Kg Paku Biasa 2'' - 5''25 Kg Paku Eternit, Lis
26 Btg Bambu
27 Lbr Eternit Kerang Super
28 M2 Kaca Bening 5 mm
29 Lbr Multiplek 9 mm 1,20 x 2,40 m
30 Bj Genteng Pres Plentong
No. SATUAN JENIS MATERIAL/BAHAN
DAFTAR HARGA SATUAN UPAH DAN BA
NO. SATUAN JENIS UPAH
M a n d o r
Tukang Batu
Tukang Kayu
Tukang Besi
Tukang Cat
Kepala Tukang
P e k e r j a
Pekerja Bongkar / Siram
-
8/10/2019 Rab New Okt 14 Analisa
21/24
31 Bj Genteng Nok Pres Soka
32 Kg Cat Kayu (sekualitas Aviant)33 Kg Cat Tembok (sekualitas Decolith)
34 Kg Cat Meni
35 Kg Plamir Tembok
36 Kg Plamir Kayu
37 Kg Lem Kayu
38 Bh Engsel Pintu
39 Bh Engsel Jendela Kupu - kupu
40 Bh Kait Angin Model Lipat
41 Bh Kunci Slot
Purwokerto, 19 September 2
CV. WAHANA
S U D A R Y O
Direktur
No. SATUAN JENIS MATERIAL/BAHAN
-
8/10/2019 Rab New Okt 14 Analisa
22/24
HARGA SATUAN UPAH
Rp.
60,000.00
60,000.00 pagu 176,311,000.00
60,000.00
60,000.00 Tawar 224,047,000.00
65,000.00
40,000.00 Turun (47,736,000.00)
40,000.00
60,000.00
HARGA SATUAN BAHAN
Rp.
150,000.00
140,000.00
120,000.00
200,000.00
150,000.00
250,000.00
600.00
5,850.00
70,000.00
1,400.00
7,000.00
12,500.00
25,000.0021,500.00
6,000.00
2,000,000.00
6,800,000.00
5,000,000.00
6,500,000.00
7,000,000.00
8,000.00
20,500.00
6,400,000.00
20,000.0022,500.00
17,500.00
12,500.00
110,000.00
125,000.00
2,000.00
HAN
-
8/10/2019 Rab New Okt 14 Analisa
23/24
HARGA SATUAN BAHAN
Rp.
3,900.00
38,500.0015,000.00 15,000.00
21,500.00
9,000.00
18,500.00
20,000.00
10,000.00
8,500.00
8,500.00
115,000.00
012
-
8/10/2019 Rab New Okt 14 Analisa
24/24
KEGIATAN : REHABILITASI GEDUNG SD DAN MEUBELAIR
PEKERJAAN : REHABILITASI GEDUNG SD N 1 CIPETE
LOKASI : KECAMATAN CILONGOK
BIAYA : Rp. 205.123.000,00
TAHUN ANGGARAN : 2010
NILAI BOBOT
PEKERJAAN ( Rp ) ( % ) Mg. 1 Mg. 2 Mg. 3 Mg. 4 Mg. 1 Mg. 2 Mg. 3 Mg. 4 Mg. 1 Mg. 2
I. PEKERJAAN PERSIAPAN
1 Pengukuran & pemasangan bouwplank k.y tahun 500,000.00 0.245 0.312
2 Membersihkan lapangan 450,000.00 0.221 0.140
3 Pemb. bak adukan uk. (40x50x20) cm ky. tahun 112,190.00 0.055 0.054
4 Pembuatan steger dari bambu 617,850.00 0.303 0.243
5 Pengadaan air kerja 300,000.00 0.147 0.187
II. PEKERJAAN TANAH DAN PASIR
1 Galian tanah biasa sedalam 1 m 22,680.00 0.011 0.009
2 Urugan kembali 4,094.22 0.002 0.002
3 Urugan pasir 10,962.00 0.005 0.004
III. PEKERJAAN PASANGAN DAN PLESTERAN1 Pas. pondasi batu kali 1 PC : 3 Kp : 10 Ps 124,294.30 0.061 0.054
2 Pas. batu merah tb. 1/2 bata 1 PC : 3 Kp : 10 PP 5,612,206.50 2.755 1.698 1.000
3 Plesteran 1 PC : 3 PP tb. 1,5 cm 1,312,839.70 0.645 0.584
4 Plesteran 1 PC : 3 KP : 10 PP tb. 1,5 cm 3,505,159.98 1.721 1.447
IV. PEKERJAAN BETON
1 Membuat beton cor 1 PC : 2 Ps : 3 Kr 4,193,304.15 2.059 0.677 0.677 0.677
2 Pembesian dengan besi beton polos 8,237,925.05 4.045 1.232 1.232 1.233
3 Cetakan kayu tahun 6,585,856.75 3.233 0.999 0.999 1.000
4 Kolom praktis beton bertulang (11 x 11) cm 1,329,405.00 0.653 0.601
V. PEKERJAAN KAYU DAN ATAP
1 Pas. kusen pintu dan jendela kayu kruing 11,331,180.00 5.563 6.008
2 Jendela kaca 5 mm ky. kruing sederhana tb. 3cm 3,635,550.00 1.785
3 Pas. jalusi mati kusen kayu kruing 3,929,016.00 1.929 2.059
4 Pas. konstruksi kuda-kuda kayu kruing 9,337,609.50 4.584
5 Konstruksi gording, kayu kruing 10,741,404.00 5.274
6 Pas. kaso & reng genteng kayu kruing 29,301,594.40 14.386
7 Pas. lisplank kayu kruing uk. 2 ( 2 x 20 ) cm 5,358,570.00 2.631
8 Pas. atap genteng plentong kecil 18,484,440.00 9.075
9 Pas. atap genteng nok plentong/kodok 1,427,660.00 0.701
10 Pintu panil multiplek 9 mm rk. Ky. kruing ( tb. 3,5 cm ) 4,057,149.60 1.992
11 Pas. langit2 eternit (1,00x1,00) m rk. Ky. meranti 25,454,838.50 12.497
12 Pas. lis langit-langit kayu kruing 3,041,855.50 1.493
VI. PEKERJAAN KUNCI DAN KACA
1 Pasang engsel pintu 309,300.00 0.152
2 Pasang engsel jendela kupu-kupu 726,560.00 0.3573 Pasang kait angin model lipat 726,560.00 0.357
4 Pasang kunci selot 387,480.00 0.190
5 Pasang kaca tebal 5 mm 737,072.00 0.362
6 Pasang grendel pintu 45,000.00 0.022
7 Pasang grendel jendela 112,500.00 0.055
8 Pasang tarikan jendela 30,000.00 0.015
VII. PEKERJAAN LANTAI
1 Pas. lantai keramik uk. ( 30 x 30 ) cm (Klas A) 25,077,645.10 12.312
VIII. PEKERJAAN PENGECATAN
1 Pengecatan bidang kayu baru sek. Avian 3,081,120.00 1.513
2 Pengecatan tembok baru sek. Decolith 818,381.83 0.402
3 Pengecatan tembok lama sek. Decolith 3,739,633.36 1.836
4 Pengecatan plapond 3x (sek. Decolith) 5,824,295.23 2.860
IX. PEKERJAAN INSTALASI LISTRIK
1 Pasang instalasi titik cahaya / lampu 1,755,000.00 0.862
2 Pasang instalasi stop kontak 540,000.00 0.265
3 Saklar ganda 100,000.00 0.049
4 Saklar tunggal 55,500.00 0.027
5 Stop kontak 74,000.00 0.036
6 Pasang lampu TL 20 watt 500,000.00 0.245
7 Pasang lampu pijar 20,000.00 0.010
JUMLAH NILAI PEKERJAAN 203,679,682.66 100.000
MINGGUAN 0.65 3.02 5.45 10.50 3.51 0.00 0.00 0.00 0.00 0.00
KOMULATIF 0 0.65 3.67 9.12 19.62 23.13 #REF! #REF! #REF! #REF! #REF!MINGGUAN
KOMULATIF
DEVIASI (POSITIF/NEGATIF)
Keterangan : Purwokerto, 19 September 2012
* Jangka Waktu Pelaksanaan 120 Hari Kalender
* Jangka Waktu Pemeliharaan 180 Hari Kalender PENAWAR
CV. WAHANA
Direktur
Direktur
JADWAL WAKTU PELAKSANAAN
NO. JENIS PEKERJAANBULAN III
%
100
50
RENCANA
REALISASI
BULAN I BULAN II
0