  • RENCANA ANGGARAN BIAYA (RAB)Pekerjaan : Pembangunan MushollaTahun Anggaran : 2015Analisa dan Harga Tahun : 2011

    NO URAIAN PEKERJAAN ANALISA VOLUME

    1 2 3 4I PEKERJAAN PENDAHULUAN

    1 Pembersihan Lokasi/Pengukuran Ls 1.000JUMLAH I

    II PEKERJAAN TANAH1 Pek. Galian Tanah Untuk Pondasi 2.1 3.6402 Pek. Urugan Pasir Bawah Pondasi 2.11 0.3643 Pek. Urugan Tanah Kembali 2.9 2.5484 Pek. Pemadatan 2.10 0.3645 Pek. Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr 7.1 0.182

    JUMLAH IIIII PEKERJAAN BATU, BETON, LANTAI DAN PLESTERAN

    1 Pas. Pondasi beton bertulang (100 kg besi + bekesting) 3434.6B.38a 1.2702 Pek. Pasangan Dinding Bata Camp. 1:4 4.4 73.9303 Pek. Pasangan dinding keramik tempat wudhu 20 x 20 cm 2838.6E.68 5.2004 Pek. 1 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 6 Kr untuk tempat wudhu 3434.6B.2 0.1525 pek. Cor dak Camp. 1:2:3 untuk Pelat Lantai dan Atap 3434.6B.42a 12.4176 pek. Cor dak Camp. 1:2:3 untuk kanopi 7.1 2.3557 pek. Cor portal pintu depan Camp. 1:2:3 7.1 0.1638 Pek. Kolom Beton Bertulang Camp. 1:2:3 (30/30) 3434.6B.40a 2.8449 Pek. Balok lantai dan balok atap Beton bertulang Camp. 1:2:3 ( 20/30 ) 3434.6B.42a 6.252

    10 Pek. tangga beton bertulang (200 Kg besi + bekisting) 7.44 0.41611 Pek. Plesteran Tembok Camp. 1:4 2837.6B.4 147.86012 Pek. Keramik ( Lantai ) 40x40 cm 2838.6E.48b 27.00013 Pek. Keramik tempat wudhu 20x20 cm 2838.6E.44 2.800

    JUMLAH IIIIV PEKERJAAN KAYU

    1 Pek. Kusen Kayu Ulin 7/15 3434.6A.1a 0.285JUMLAH IV

    V PEKERJAAN PINTU DAN JENDELA 1 Daun Pintu Panil Kayu Ulin 3434.6A.4a 3.1902 Daun Jendela Kaca Tebal 5 mm Rangka Kayu Ulin 3434.6A.4b 9.7903 Ventilasi Instan Ls 12.000

    JUMLAH VVI PEKERJAAN BESI PENGGANTUNG

    1 Pasang Kunci Tanam Ls 2.0002 Pasang Engsel Pintu Ls 9.000

  • 3 Pasang Engsel Jendela Ls 4.0004 Pasang Grendel Jendela Ls 2.0005 Pasang Tarikan Jendela Ls 2.0006 Pasang Hak Angin Jendela Ls 2.0007 Pasang Railing stainles steel untuk tangga dan balkon Ls 36.200

    JUMLAH VIVII PEKERJAAN PENGECATAN

    1 Cat Tembok Dinding + Plafond 2838.6f.1 260.740 2 Mengecat Kilap Kayu 2838.6f.2 7.190

    JUMLAH VII

  • NO URAIAN PEKERJAAN ANALISA VOLUME

    1 2 3 4VIII PEKERJAAN INSTALASI LISTRIK DAN TITIK LAMPU

    1 Pek. Instalasi Titik Lampu Ls 6.0002 Pas. Saklar Tunggal Ls 2.0003 Pas. Stop Kontak Ls 3.0004 MCB 1 x 10 A - MC 45 A Ls 1.000

    JUMLAH VIIIIX PEKERJAAN INST. AIR BERSIH DAN AIR KOTOR

    1 Pekerjaan pasangan kran dia. 3/4" Ls 5.0002 Pekerjaan pasangan floor draine Ls 1.0003 Pasang Pipa Air Bersih 1" Ls 3.0004 Pasang Pipa Air Kotor 2" Ls 3.0005 Pasang talang air miring, seng bjls 28 11.190 30.200

    JUMLAH IXIV PEKERJAAN ATAP

    1 Pekerjaan ter-teran rangka atap keseluruhan 2.9 59.5002 Pekerjaan kuda-kuda 6/12 ky kls II 2.11 0.3623 Pekerjaan reng 3/5 dan kasau 5/7 ky kls II 4.11 0.0604 Pekerjaan gording 6/12 ky kls II 3.5 0.3465 Pekerjaan pasang penutup atap metal 8.32.a 31.5606 Pasang bubungan atap metal 8.36 1.5007 Pasang talang seng plat 6.16.a 31.0008 Pekerjaan lisplank ulin 2x 2/20 6.52.a 31.000

    JUMLAH X

    REKAPITULASI

    I PEKERJAAN PENDAHULUAN

    II. PEKERJAAN TANAH

    III. PEKERJAAN BATU, BETON, LANTAI DAN PLESTERAN

    IV. PEKERJAAN KAYU

    V. PEKERJAAN PINTU DAN JENDELA

    VI. PEKERJAAN BESI PENGGANTUNG

    VII. PEKERJAAN PENGECATAN

    VIII. PEKERJAAN INSTALASI LISTRIK DAN TITIK LAMPU

  • IX. PEKERJAAN INST. AIR BERSIH DAN AIR KOTOR

    IX. PEKERJAAN ATAP

    JUMLAH PPN 10 %

    JUMLAH TOTAL DIBULATKAN

    Terbilang : ### Seratus Sembilan Puluh Tiga Juta Rupiah ###

  • RENCANA ANGGARAN BIAYA (RAB)

    VOLUME HARGA SATUAN JUMLAH(Rp) (Rp)

    4 5 6

    Unit 1,000,000.00 1,000,000.00 JUMLAH I 1,000,000.00

    29,442.00 107,168.88 98,980.50 36,028.90 28,658.70 73,022.37 36,802.50 13,396.11

    763422.040 138,942.81JUMLAH II 229,616.26

    2,995,327.94 3,804,066.48M 241,993.07 17,890,547.67M 168,750.20 877,501.04

    898,839.55 136,623.61 4,034,399.92 50,094,336.97 956,685.68 2,253,186.11 956,685.68 155,461.42 3,802,741.43 10,814,996.63 4,034,399.92 25,223,068.32 4,863,030.55 2,023,020.71

    M 36,163.38 5,347,117.37M 179,869.26 4,856,469.97M 193,157.74 540,841.67JUMLAH III 123,476,396.29

    5,608,415.00 1,598,398.28JUMLAH IV 1,598,398.28

    M 371,532.50 1,185,188.68M 303,667.00 2,972,899.93Bh 35,000.00 420,000.00JUMLAH V 4,578,088.61

    Bh 189,990.00 379,980.00Bh 45,022.00 405,198.00

    M3

    M3

    M3

    M3

    M3

    M3

    M3

    M3

    M3

    M3

    M3

    M3

    M3

    M3

  • Bh 30,055.00 120,220.00Bh 6,500.00 13,000.00Bh 22,998.00 45,996.00Bh 7,450.00 14,900.00M' 350,000.00 12,670,000.00JUMLAH VI 13,649,294.00

    M 16,837.15 4,390,117.19M 40,637.74 292,185.35JUMLAH VII 4,682,302.54

  • VOLUMEHARGA SATUAN JUMLAH

    (Rp) (Rp)

    4 5 6

    Bh 250,000.00 1,500,000.00Bh 45,000.00 90,000.00Bh 45,000.00 135,000.00Bh 150,000.00 150,000.00

    JUMLAH VIII 1,875,000.00

    Bh 35,000.00 175,000.00Bh 35,000.00 35,000.00Btg 23,473.94 70,421.82Btg 45,501.21 136,503.64M' 82,342.10 2,486,731.36JUMLAH IX 2,903,656.81

    m2 9108.000 541,926.00m3 70674.000 25,554.59m2 64065.789 3,843.95m3 637918.631 220,464.68m2 147220.000 4,646,263.20m' 46805.000 70,207.50m' 345485.780 10,710,059.18m' 205284.420 6,363,817.02JUMLAH X 22,582,136.11

    REKAPITULASI

    Rp. 1,000,000.00

    Rp. 229,616.26

    Rp. 123,476,396.29

    Rp. 1,598,398.28

    Rp. 4,578,088.61

    Rp. 13,649,294.00

    Rp. 4,682,302.54

    Rp. 1,875,000.00

  • Rp. 2,903,656.81

    Rp. 22,582,136.11

    JUMLAH Rp. 176,574,888.90 PPN 10 % 17,657,488.89

    JUMLAH TOTAL 194,232,377.79 DIBULATKAN 193,000,000.00

    Terbilang : ### Seratus Sembilan Puluh Tiga Juta Rupiah ###

  • BOQPekerjaan : Pembangunan MushollaTahun Anggaran : 2015

    NO URAIAN PEKERJAAN PNJG LEBAR

    1 2 3 4I PEKERJAAN PENDAHULUAN

    1 Pembersihan Lokasi/Pengukuran

    II PEKERJAAN TANAH1 Pek. Galian Tanah Untuk Pondasi 1.000 1.0002 Pek. Urugan Pasir Bawah Pondasi 1.000 1.0003 Pek. Urugan Tanah Kembali 1.000 1.0004 Pek. Pemadatan 1.000 1.0005 Pek. Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr 1.000 1.000

    III PEKERJAAN BATU, BETON, LANTAI DAN PLESTERAN1 Pas. Pondasi beton bertulang (100 kg besi + bekesting)

    pelat pondasi 1.000 1.000tiang pondasi 0.300 0.300

    2 Pek. Pasangan Dinding Bata Camp. 1:4dinding naik 1 m dari gedung bawah 6.140

    4.200dinding musholla depan 4.500

    belakang 4.500kanan 6.000kiri 6.000

    3 Pek. Pasangan dinding keramik tempat wudhu 20 x 20 cm 4.000 1.3004 Pek. Membuat beton tumbuk, 1 Pc : 3 Ps : 6 Kr untuk tempat air buangan wudhu

    lantai jalur air buangan air wudhu 4.000 0.200dinding jalur buangan air wudhu 4.000 0.150

    5 pek. Cor dak Camp. 1:2:3 untuk Pelat Lantai dan Atappelat lantai 8.300 6.800pelat atap 8.300 6.800

    6 pek. Cor dak Camp. 1:2:3 untuk kanopi 8.300 6.8007 pek. Cor portal pintu depan Camp. 1:2:3

    2.250 0.250

  • 2.000 0.250

    8 Pek. Kolom Beton Bertulang Camp. 1:2:3 (30/30) 0.300 0.3009 Pek. Balok lantai dan balok atap Beton bertulang Camp. 1:2:3 ( 20/30 )

    balok lantai 0.300 0.2000.300 0.200

    balok atap 0.300 0.2000.300 0.200

    10 Pek. tangga beton bertulang (200 Kg besi + bekisting) 2.600 0.80011 Pek. Plesteran Tembok Camp. 1:412 Pek. Keramik ( Lantai ) 40x40 cm 6.000 4.50013 Pek. Keramik tempat wudhu 20x20 cm

    4.000 0.2004.000 0.150

    IV PEKERJAAN KAYU1 Pek. Kusen Kayu Ulin 7/15

    V PEKERJAAN PINTU DAN JENDELA 1 Daun Pintu Panil Kayu Ulin

    pintu depan 1.800 1.000pintu belakang 1.800 0.800

    2 Daun Jendela Kaca Tebal 5 mm Rangka Kayu Ulin3 Ventilasi Instan

    VI PEKERJAAN BESI PENGGANTUNG1 Pasang Kunci Tanam2 Pasang Engsel Pintu3 Pasang Engsel Jendela4 Pasang Grendel Jendela5 Pasang Tarikan Jendela6 Pasang Hak Angin Jendela7 Pasang Railing stainles steel untuk tangga dan balkon

    8.3006.800

    2.6000.800

    VII PEKERJAAN PENGECATAN1 Cat Tembok Dinding + langit langit

    dindinglangit-langit 8.300 6.800

  • 2 Mengecat Kilap Kayu

    VIII PEKERJAAN INSTALASI LISTRIK DAN TITIK LAMPU1 Pek. Instalasi Titik Lampu2 Pas. Saklar Tunggal3 Pas. Stop Kontak4 MCB 1 x 10 A - MC 45 A

    IX PEKERJAAN INST. AIR BERSIH DAN AIR KOTOR1 Pekerjaan pasangan kran dia. 3/4"atau 1/2"2 Pekerjaan pasangan floor draine3 Pasang Pipa Air Bersih 1" 4.0004 Pasang Pipa Air Kotor 2" 4.0005 Pasang talang air miring, seng bjls 28 8.300 6.800

    IV PEKERJAAN ATAP1 Pekerjaan ter-teran rangka atap keseluruhan 8.500 7.0002 Pekerjaan kuda-kuda 6/12 ky kls II 0.120 0.0603 Pekerjaan reng 3/5 dan kasau 5/7 ky kls II 0.050 0.0304 Pekerjaan gording 6/12 ky kls II

    0.120 0.0600.120 0.060

    5 Pekerjaan pasang penutup atap metal8.500

    7.500

    6 Pasang bubungan atap metal 1.5007 Pasang talang seng plat 8.500 7.0008 Pekerjaan lisplank ulin 2x 2/20 8.500 7.000

  • Diketahui/Diperiksa :Ketua Panitia Pembangunan USB SMUPangka