rab harga standar 2012

199
4.15 REKAPITULASI RAB REKAPITULASI KEGIATAN : PEMBANGUNAN RUKO PEKERJAAN : RENCANA PEMBANGUNAN RUKO 3 LANTAI DI JL. MARSMA R. ISWAHYUDI BALIKPAPAN TAHUN : 2012 NO URAIAN PEKERJAAN NILAI PEKERJAAN (Rp) I PEKERJAAN PENDAHULUAN 23,742,500.00 II PEKERJAAN TANAH GALIAN/ URUGAN PASIR DAN PASANGAN 23,454,985.75 III PEKERJAAN BETON 120,207,932.45 IV PEKERJAAN PEMBESIAN 252,185,610.39 V PEKERJAAN BEKISTING 345,860,158.45 VI PEKERJAAN DINDING 97,685,741.49 VII PEKERJAAN LANTAI 57,852,182.41 VIII PEKERJAAN LANGIT-LANGIT / PLAFOND 86,144,681.25 IX PEK. KUSEN, DAUN PINTU DAN JENDELA 32,583,600.50 X PEKERJAAN INSTALASI LISTRIK 11,585,290.00 XI PEKERJAAN SANITAIR DAN INSTALASI AIR 19,390,976.30 XII PEKERJAAN PENGECATAN 48,794,697.69 XIII PEKERJAAN PENGGANTUNG DAN PENGUNCI 4,807,500.00 X1V PEKERJAAN LAIN-LAIN 2,000,000.00 JUMLAH PEKERJAAN FISIK Rp1,126,295,856.69 PPN 10% Rp112,629,585.67 KEUNTUNGAN 5% Rp56,314,792.83 OVER HEAD 10% Rp112,629,585.67 JUMLAH KESELURUHAN Rp1,407,869,820.86 DIBULATKAN Rp1,407,870,000.00 TERBILANG: "SATU MILIAR EMPAT RATUS TUJUH JUTA DELAPAN RATUS TUJUH PULUH RIBU RUPIAH "

Upload: ebstyo

Post on 29-Oct-2015

282 views

Category:

Documents


5 download

TRANSCRIPT

4.15 REKAPITULASI RAB

REKAPITULASIKEGIATAN : PEMBANGUNAN RUKOPEKERJAAN : RENCANA PEMBANGUNAN RUKO 3 LANTAI DI JL. MARSMA R. ISWAHYUDI BALIKPAPANTAHUN : 2012

NO URAIAN PEKERJAAN NILAI PEKERJAAN (Rp)

I PEKERJAAN PENDAHULUAN 23,742,500.00II PEKERJAAN TANAH GALIAN/ URUGAN PASIR DAN PASANGAN 23,454,985.75III PEKERJAAN BETON 120,207,932.45IV PEKERJAAN PEMBESIAN 252,185,610.39V PEKERJAAN BEKISTING 345,860,158.45VI PEKERJAAN DINDING 97,685,741.49VII PEKERJAAN LANTAI 57,852,182.41VIII PEKERJAAN LANGIT-LANGIT / PLAFOND 86,144,681.25IX PEK. KUSEN, DAUN PINTU DAN JENDELA 32,583,600.50X PEKERJAAN INSTALASI LISTRIK 11,585,290.00XI PEKERJAAN SANITAIR DAN INSTALASI AIR 19,390,976.30XII PEKERJAAN PENGECATAN 48,794,697.69XIII PEKERJAAN PENGGANTUNG DAN PENGUNCI 4,807,500.00

X1V PEKERJAAN LAIN-LAIN 2,000,000.00

JUMLAH PEKERJAAN FISIK Rp1,126,295,856.69

PPN 10% Rp112,629,585.67KEUNTUNGAN 5% Rp56,314,792.83

OVER HEAD 10% Rp112,629,585.67

JUMLAH KESELURUHAN Rp1,407,869,820.86

DIBULATKAN Rp1,407,870,000.00TERBILANG:

"SATU MILIAR EMPAT RATUS TUJUH JUTA DELAPAN RATUS TUJUH PULUH RIBU RUPIAH "

SNI - 2

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan 1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN

1 Pagar Sementara Dari Kayu Tinggi 2 Meter M' I.1. 0.4000 Oh Pekerja 60,000.00 24,000.00 - 0.2000 Oh Tukang Kayu 80,000.00 16,000.00 - 0.0200 Oh Kepala Tukang 90,000.00 1,800.00 - 0.0200 Oh Mandor 85,000.00 1,700.00 - 1.2500 Btg Dolken Kayu Dia. 8 - 400 cm 70,000.00 - 87,500.00 2.5000 Kg Semen PC ex Tonasa 1,600.00 - 4,000.00 0.0050 M3 Pasir Beton 312,500.00 - 1,562.50 0.0090 M3 Koral Beton 380,600.00 - 3,425.40 0.0720 M3 Kayu Meranti 3,500,000.00 - 252,000.00 0.0600 Kg Paku Biasa 15,000.00 - 900.00 0.4000 Ltr Residu 15,000.00 - 6,000.00

Jumlah 43,500.00 355,387.90

2 Pagar Sementara Dari Seng Gelombang Tinggi 2 Meter M' I.2. 0.4000 Oh Pekerja 60,000.00 24,000.00 - 0.2000 Oh Tukang Kayu 80,000.00 16,000.00 - 0.0200 Oh Kepala Tukang 90,000.00 1,800.00 - 0.0200 Oh Mandor 85,000.00 1,700.00 - 1.2500 Btg Dolken Kayu Dia. 8 - 400 cm 70,000.00 - 87,500.00 2.5000 Kg Semen Ex. Tonasa 1,600.00 - 4,000.00 1.2000 Lbr Seng Gelombang 100,000.00 - 120,000.00 0.0050 M3 Pasir Beton 312,500.00 - 1,562.50 0.0090 M3 Koral Beton 380,600.00 - 3,425.40 0.0720 M3 Kayu Meranti 3,500,000.00 - 252,000.00 0.0600 Kg Paku Biasa 15,000.00 - 900.00 0.4500 Kg Meni Besi 61,500.00 - 27,675.00

Jumlah 43,500.00 497,062.90

3 Pagar Sementara Dari Kawat Duri Tinggi 1,8 Meter M' I.3. 0.3000 Oh Pekerja 60,000.00 18,000.00 - 0.2000 Oh Tukang Kayu 80,000.00 16,000.00 - 0.0200 Oh Kepala Tukang 90,000.00 1,800.00 - 0.0200 Oh Mandor 85,000.00 1,700.00 - 1.0000 Btg Dolken Kayu Dia. 8 - 400 cm 70,000.00 - 70,000.00 2.0000 Kg Semen PC ex. Tonasa 1,600.00 - 3,200.00 25.0000 Kg Kawat duri 80,000.00 - 2,000,000.00 0.0050 M3 Pasir Beton 312,500.00 - 1,562.50 0.0090 M3 Koral Beton 380,600.00 - 3,425.40 0.0600 Kg Paku Biasa 15,000.00 - 900.00

Jumlah 37,500.00 2,079,087.90

4 Pengukuran Dan Pemasangan Bouwplank M' I.4. 0.1000 Oh Pekerja 60,000.00 6,000.00 - 0.1000 Oh Tukang Kayu 80,000.00 8,000.00 - 0.0100 Oh Kepala Tukang 90,000.00 900.00 - 0.0050 Oh Mandor 85,000.00 425.00 - 0.0190 M3 Kayu Meranti 3,500,000.00 - 66,500.00 0.0200 Kg Paku Biasa 15,000.00 - 300.00

Jumlah 15,325.00 66,800.00

5 Pembuatan Rumah Jaga/Konstruksi Kayu M2 I.5. 1.0000 Oh Pekerja 60,000.00 60,000.00 - 1.5000 Oh Tukang Kayu 80,000.00 120,000.00 - 0.1500 Oh Kepala Tukang 90,000.00 13,500.00 - 0.0500 Oh Mandor 85,000.00 4,250.00 - 3.0000 Btg Dolken Kayu Dia. 8 - 400 cm 70,000.00 - 210,000.00 0.2760 M3 Kayu Meranti 3,500,000.00 - 966,000.00 0.7000 Kg Paku Biasa 15,000.00 - 10,500.00 1.5000 Lbr Seng Gelombang BJLS 30 100,000.00 - 150,000.00

Jumlah 197,750.00 1,336,500.00

6 Membersihkan Lapangan Dan Perataan M2 I.6. 0.1000 Oh Pekerja 60,000.00 6,000.00 - 0.0500 Oh Mandor 85,000.00 4,250.00 -

Jumlah 10,250.00 -

7 Pembuatan Bedeng Buruh M2 I.7. 1.0000 Oh Pekerja 60,000.00 60,000.00 - 2.0000 Oh Tukang Kayu 80,000.00 160,000.00 - 0.2000 Oh Kepala Tukang 90,000.00 18,000.00 - 0.0500 Oh Mandor 85,000.00 4,250.00 - 1.2500 Btg Dolken Kayu Dia. 8 - 400 cm 70,000.00 - 87,500.00 0.1860 M3 Kayu Meranti 3,500,000.00 - 651,000.00 0.3000 Kg Paku Biasa 15,000.00 - 4,500.00 1.5000 Lbr Seng Gelombang BJLS 30 100,000.00 - 150,000.00

Jumlah 242,250.00 893,000.00

7 Pembuatan Jalan Sementara M2 I.7. 1.0000 Oh Pekerja 60,000.00 60,000.00 - 0.0500 Oh Mandor 85,000.00 4,250.00 -

SNI - 3

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan 0.1500 M3 Batu Pecah 15/20 346,000.00 - 51,900.00 0.0900 M3 Batu Pecah 5/7 346,000.00 - 31,140.00 0.0100 M3 Pasir Pasang 235,000.00 - 2,350.00

Jumlah 64,250.00 85,390.00

8 Bongkaran Beton Bertulang M3 I.8. 6.6670 Oh Pekerja 60,000.00 400,020.00 - 0.3330 Oh Mandor 85,000.00 28,305.00 -

Jumlah 428,325.00 -

9 Bongkaran Dinding Tembok Batu Bata M3 I.9. 6.6670 Oh Pekerja 60,000.00 400,020.00 - 0.3330 Oh Mandor 85,000.00 28,305.00 -

Jumlah 428,325.00 -

II. PEKERJAAN TANAH 1 Penggalian Tanah Biasa Sedalam 1 Meter M3 II.1.

0.4000 Oh Pekerja 60,000.00 24,000.00 - 0.0400 Oh Mandor 85,000.00 3,400.00 -

Jumlah 27,400.00 -

2 Penggalian Tanah Biasa Sedalam 2 Meter M3 II.2. 0.5260 Oh Pekerja 60,000.00 31,560.00 - 0.0520 Oh Mandor 85,000.00 4,420.00 -

Jumlah 35,980.00 -

3 Penggalian Tanah Biasa Sedalam 3 Meter M3 II.3. 0.7350 Oh Pekerja 60,000.00 44,100.00 - 0.0730 Oh Mandor 85,000.00 6,205.00 -

Jumlah 50,305.00 -

4 Penggalian Tanah Keras Sedalam 1 Meter M3 II.4. 0.6250 Oh Pekerja 60,000.00 37,500.00 - 0.0620 Oh Mandor 85,000.00 5,270.00 -

Jumlah 42,770.00 -

5 Penggalian Tanah Cadas Sedalam 1 Meter M3 II.5. 1.2500 Oh Pekerja 60,000.00 75,000.00 - 0.1250 Oh Mandor 85,000.00 10,625.00 -

Jumlah 85,625.00 -

6 Penggalian Tanah Lumpur Sedalam 1 Meter M3 II.6. 0.8230 Oh Pekerja 60,000.00 49,380.00 - 0.0830 Oh Mandor 85,000.00 7,055.00 -

Jumlah 56,435.00 -

7 Pekerjaan Stripping Setinggi 1 Meter M2 II.7. 0.0500 Oh Pekerja 60,000.00 3,000.00 - 0.0050 Oh Mandor 85,000.00 425.00 -

Jumlah 3,425.00 -

8 Pembuangan Tanah Sejauh 150 Meter M3 II.8. 0.5160 Oh Pekerja 60,000.00 30,960.00 - 0.0500 Oh Mandor 85,000.00 4,250.00 -

Jumlah 35,210.00 -

9 Urugan Kembali M3 II.9. 0.1920 Oh Pekerja 60,000.00 11,520.00 - 0.0190 Oh Mandor 85,000.00 1,615.00 -

Jumlah 13,135.00 -

10 Pemadatan Tanah M3 II.10. 0.5000 Oh Pekerja 60,000.00 30,000.00 - 0.0500 Oh Mandor 85,000.00 4,250.00 -

Jumlah 34,250.00 -

11 Urugan Tanah M3 II.11. 0.3000 Oh Pekerja 60,000.00 18,000.00 - 0.0100 Oh Mandor 85,000.00 850.00 - 1.2000 M3 Tanah Urug 42,500.00 51,000.00

Jumlah 18,850.00 51,000.00

12 Urugan Pasir M3 II.12. 0.3000 Oh Pekerja 60,000.00 18,000.00 - 0.0100 Oh Mandor 85,000.00 850.00 - 1.2000 M3 Pasir Urug 75,000.00 90,000.00

Jumlah 18,850.00 90,000.00

13 Urugan Sirtu M3 II.13. 0.2500 Oh Pekerja 60,000.00 15,000.00 - 0.0250 Oh Mandor 85,000.00 2,125.00 - 1.2000 M3 Sirtu 380,600.00 456,720.00

Jumlah 17,125.00 456,720.00

14 Pembuatan Jalan Sementara, Tebal 25 cm M3 II.14.

SNI - 4

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan 1.0000 Oh Pekerja 60,000.00 60,000.00 - 0.1000 Oh Mandor 85,000.00 8,500.00 - 0.2750 M3 Batu Pecah 346,000.00 - 95,150.00 0.0300 M3 Kerikil 380,600.00 - 11,418.00 0.0500 M3 Pasir Pasang 235,000.00 - 11,750.00

Jumlah 68,500.00 118,318.00

III. PEKERJAAN PONDASI

1 Pasang Batu Gunung Campuran 1Pc : 1Psr M3 III.1. 1.5000 Oh Pekerja 60,000.00 90,000.00 - 0.6000 Oh Tukang Batu 80,000.00 48,000.00 - 0.0600 Oh Kepala Tukang 90,000.00 5,400.00 - 0.0750 Oh Mandor 85,000.00 6,375.00 - 1.1000 M3 Batu Gunung 362,500.00 - 398,750.00 392.0000 Kg Semen Ex. Tonasa 1,600.00 - 627,200.00 0.3140 M3 Pasir Pasang 235,000.00 - 73,790.00

Jumlah 149,775.00 1,099,740.00

2 Pasang Batu Gunung Campuran 1Pc : 2 Psr M3 III.2. 1.5000 Oh Pekerja 60,000.00 90,000.00 - 0.6000 Oh Tukang Batu 80,000.00 48,000.00 - 0.0600 Oh Kepala Tukang 90,000.00 5,400.00 - 0.0750 Oh Mandor 85,000.00 6,375.00 - 1.1000 M3 Batu Gunung 362,500.00 - 398,750.00 267.0000 Kg Semen Ex. Tonasa 1,600.00 - 427,200.00 0.4270 M3 Pasir Pasang 235,000.00 - 100,345.00

Jumlah 149,775.00 926,295.00

3 Pasang Batu Gunung Campuran 1Pc : 2,5Psr M3 III.3. 1.5000 Oh Pekerja 60,000.00 90,000.00 - 0.6000 Oh Tukang Batu 80,000.00 48,000.00 - 0.0600 Oh Kepala Tukang 90,000.00 5,400.00 - 0.0750 Oh Mandor 85,000.00 6,375.00 - 1.1000 M3 Batu Gunung 362,500.00 - 398,750.00 234.0000 Kg Semen Ex. Tonasa 1,600.00 - 374,400.00 0.4560 M3 Pasir Pasang 235,000.00 - 107,160.00

Jumlah 149,775.00 880,310.00

4 Pasang Batu Gunung Campuran 1Pc : 3Psr M3 III.4. 1.5000 Oh Pekerja 60,000.00 90,000.00 - 0.6000 Oh Tukang Batu 80,000.00 48,000.00 - 0.0600 Oh Kepala Tukang 90,000.00 5,400.00 - 0.0750 Oh Mandor 85,000.00 6,375.00 - 1.1000 M3 Batu Gunung 362,500.00 - 398,750.00 202.0000 Kg Semen Ex. Tonasa 1,600.00 - 323,200.00 0.4850 M3 Pasir Pasang 235,000.00 - 113,975.00

Jumlah 149,775.00 835,925.00

5 Pasang Batu Gunung Campuran 1Pc : 4Psr M3 III.5. 1.5000 Oh Pekerja 60,000.00 90,000.00 - 0.6000 Oh Tukang Batu 80,000.00 48,000.00 - 0.0600 Oh Kepala Tukang 90,000.00 5,400.00 - 0.0750 Oh Mandor 85,000.00 6,375.00 - 1.1000 M3 Batu Gunung 362,500.00 - 398,750.00 163.0000 Kg Semen Ex. Tonasa 1,600.00 - 260,800.00 0.5200 M3 Pasir Pasang 235,000.00 - 122,200.00

Jumlah 149,775.00 781,750.00

6 Pasang Batu Gunung Campuran 1Pc : 5Psr M3 III.6. 1.5000 Oh Pekerja 60,000.00 90,000.00 - 0.6000 Oh Tukang Batu 80,000.00 48,000.00 - 0.0600 Oh Kepala Tukang 90,000.00 5,400.00 - 0.0750 Oh Mandor 85,000.00 6,375.00 - 1.1000 M3 Batu Gunung 362,500.00 - 398,750.00 136.0000 Kg Semen Ex. Tonasa 1,600.00 - 217,600.00 0.5440 M3 Pasir Pasang 235,000.00 - 127,840.00

Jumlah 149,775.00 744,190.00

7 Pasang Batu Gunung Campuran 1Pc : 6Psr M3 III.7. 1.5000 Oh Pekerja 60,000.00 90,000.00 - 0.6000 Oh Tukang Batu 80,000.00 48,000.00 - 0.0600 Oh Kepala Tukang 90,000.00 5,400.00 - 0.0750 Oh Mandor 85,000.00 6,375.00 - 1.1000 M3 Batu Gunung 362,500.00 - 398,750.00 117.0000 Kg Semen Ex. Tonasa 1,600.00 - 187,200.00 0.5610 M3 Pasir Pasang 235,000.00 - 131,835.00

Jumlah 149,775.00 717,785.00

8 Pasang Batu Gunung Campuran 1Pc : 8Psr M3 III.8. 1.5000 Oh Pekerja 60,000.00 90,000.00 - 0.6000 Oh Tukang Batu 80,000.00 48,000.00 - 0.0600 Oh Kepala Tukang 90,000.00 5,400.00 - 0.0750 Oh Mandor 85,000.00 6,375.00 - 1.1000 M3 Batu Gunung 362,500.00 - 398,750.00

SNI - 5

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan 91.0000 Kg Semen Ex. Tonasa 1,600.00 - 145,600.00 0.5610 M3 Pasir Pasang 235,000.00 - 131,835.00

Jumlah 149,775.00 676,185.00

9 Pasang Pondasi Batu Kosong M3 III.9. 0.7800 Oh Pekerja 60,000.00 46,800.00 - 0.3900 Oh Tukang Batu 80,000.00 31,200.00 - 0.0390 Oh Kepala Tukang 90,000.00 3,510.00 - 0.0390 Oh Mandor 85,000.00 3,315.00 - 1.2000 M3 Batu Gunung 362,500.00 - 435,000.00 0.3000 M3 Pasir Urug 75,000.00 - 22,500.00

Jumlah 84,825.00 457,500.00

10 Membikin Kepala & Meruncing Tiang Ditumbuk Bh III.10. 0.1000 Oh Pekerja 60,000.00 6,000.00 - 0.2500 Oh Tukang Kayu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang Kayu 90,000.00 2,250.00 - 0.0050 Oh Mandor 85,000.00 425.00 -

Jumlah 28,675.00 -

11 Membikin Pen dan Melobang Bh III.11. Tiap-tiap Pen Dan Lobang 0.6000 Oh Tukang Kayu 80,000.00 48,000.00 - 0.0600 Oh Kepala Tukang 90,000.00 5,400.00 -

Jumlah 53,400.00 -

12 Menumbuk Tiang Ditanah Lembek (Yang Dipergunakan M' III.12. Bagian Masuk Dalam Tanah 1.8000 Oh Pekerja 60,000.00 108,000.00 - 0.0400 Oh Tukang Kayu 80,000.00 3,200.00 - 0.0040 Oh Kepala Tukang Kayu 90,000.00 360.00 - 1.0450 Oh Mandor 85,000.00 88,825.00 -

Jumlah 200,385.00 -

13 Pancang Ulin 10/10-400 Ttk III.13. 0.1000 Oh Pekerja 60,000.00 6,000.00 - 0.2500 Oh Tukang Kayu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0500 Oh Mandor 85,000.00 4,250.00 - 0.0400 M3 Kayu Ulin 10/10-400 6,000,000.00 - 240,000.00 1.0000 Ls Peralatan Pancang 3,600.00 - 3,600.00

Jumlah 32,500.00 243,600.00

13a Pancang Ulin 12/12-800 Ttk III.13a. 0.1000 Oh Pekerja 60,000.00 6,000.00 - 0.2500 Oh Tukang Kayu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0500 Oh Mandor 85,000.00 4,250.00 - 0.1152 M3 Kayu Ulin 12/12-800 7,500,000.00 - 864,000.00 1.0000 Ls Peralatan Pancang 3,600.00 - 3,600.00

Jumlah 32,500.00 867,600.00

13b Pancang Ulin 12/12-400 Ttk III.13a. 0.1000 Oh Pekerja 60,000.00 6,000.00 - 0.2500 Oh Tukang Kayu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0500 Oh Mandor 85,000.00 4,250.00 - 0.0576 M3 Kayu Ulin 12/12-800 7,500,000.00 - 432,000.00 1.0000 Ls Peralatan Pancang 3,600.00 - 3,600.00

Jumlah 32,500.00 435,600.00

14 Pancang Ulin 10/10-200 Ttk III.14. 0.1000 Oh Pekerja 60,000.00 6,000.00 - 0.2500 Oh Tukang Kayu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0500 Oh Mandor 85,000.00 4,250.00 - 0.0200 M3 Kayu Ulin 10/10-200 6,000,000.00 - 120,000.00 1.0000 Ls Peralatan Pancang 3,600.00 - 3,600.00

Jumlah 32,500.00 123,600.00

15 Pasang Pondasi Sumuran Diameter 100 cm Ttk III.15. 2.3800 Oh Pekerja 60,000.00 142,800.00 - 0.3000 Oh Tukang Batu 80,000.00 24,000.00 - 0.0300 Oh Kepala Tukang 90,000.00 2,700.00 - 0.0800 Oh Mandor 85,000.00 6,800.00 - 0.4500 M3 Batu Gunung 362,500.00 - 163,125.00 280.0000 Kg Semen Ex. Tonasa 1,600.00 - 448,000.00 0.4500 M3 Pasir Beton 312,500.00 - 140,625.00 0.6700 M3 Koral Beton 380,600.00 - 255,002.00

Jumlah 176,300.00 1,006,752.00

IV. PEKERJAAN DINDING

1 Pasang Batu Merah Campuran 1 : 4 M3 IV.1. 6.0000 Oh Pekerja 60,000.00 360,000.00 -

SNI - 6

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan 2.0000 Oh Tukang Batu 80,000.00 160,000.00 - 0.2000 Oh Kepala Tukang 90,000.00 18,000.00 - 0.3250 Oh Mandor 85,000.00 27,625.00 - 450.0000 Bh Batu Bata 900.00 - 405,000.00 2.5360 Zak Semen Ex. Tonasa 80,000.00 - 202,880.00 0.4100 M3 Pasir Pasang 235,000.00 - 96,350.00 Jumlah 565,625.00 704,230.00

2 Pasang Batu Merah Campuran 1 : 3 M3 IV.2. 6.0000 Oh Pekerja 60,000.00 360,000.00 - 2.0000 Oh Tukang Batu 80,000.00 160,000.00 - 0.2000 Oh Kepala Tukang 90,000.00 18,000.00 - 0.3250 Oh Mandor 85,000.00 27,625.00 - 450.0000 Bh Batu Bata 900.00 - 405,000.00 3.1520 Zak Semen Ex. Tonasa 80,000.00 - 252,160.00 0.3800 M3 Pasir Pasang 235,000.00 - 89,300.00 Jumlah 565,625.00 746,460.00

3 Pasang Batu Merah Campuran 1 : 2 M3 IV.3. 6.0000 Oh Pekerja 60,000.00 360,000.00 - 2.0000 Oh Tukang Batu 80,000.00 160,000.00 - 0.2000 Oh Kepala Tukang 90,000.00 18,000.00 - 0.3250 Oh Mandor 85,000.00 27,625.00 - 450.0000 Bh Batu Bata 900.00 - 405,000.00 4.1200 Zak Semen Ex. Tonasa 80,000.00 - 329,600.00 0.3400 M3 Pasir Pasang 235,000.00 - 79,900.00 Jumlah 565,625.00 814,500.00

4 Pasangan Dinding Bataco Tebal 20 cm M2 IV.4. 0.3500 Oh Pekerja 60,000.00 21,000.00 - 0.1500 Oh Tukang Batu 80,000.00 12,000.00 - 0.0150 Oh Kepala Tukang 90,000.00 1,350.00 - 0.0170 Oh Mandor 85,000.00 1,445.00 - 12.5000 Bh Bataco Tebal 20 cm 8,900.00 - 111,250.00 0.2700 Zak Semen Ex. Tonasa 80,000.00 - 21,600.00 0.0480 M3 Pasir Pasang 235,000.00 - 11,280.00 1.9500 Kg Besi Beton Polos 9,000.00 - 17,550.00 Jumlah 35,795.00 161,680.00

5 Pasangan Dinding Bataco Tebal 15 cm M2 IV.5. 0.3200 Oh Pekerja 60,000.00 19,200.00 - 0.1200 Oh Tukang Batu 80,000.00 9,600.00 - 0.0120 Oh Kepala Tukang 90,000.00 1,080.00 - 0.0150 Oh Mandor 85,000.00 1,275.00 - 12.5000 Bh Bataco Tebal 15 cm 6,725.00 - 84,062.50 0.2090 Zak Semen Ex. Tonasa 80,000.00 - 16,720.00 0.0380 M3 Pasir Pasang 235,000.00 - 8,930.00 1.9500 Kg Besi Beton Polos 9,000.00 - 17,550.00 Jumlah 31,155.00 127,262.50

6 Pasangan Dinding Bataco Tebal 10 cm M2 IV.6. 0.3200 Oh Pekerja 60,000.00 19,200.00 - 0.1000 Oh Tukang Batu 80,000.00 8,000.00 - 0.0100 Oh Kepala Tukang 90,000.00 900.00 - 0.0150 Oh Mandor 85,000.00 1,275.00 - 12.5000 Bh Bataco Tebal 10 cm 5,000.00 - 62,500.00 0.1500 Zak Semen Ex. Tonasa 80,000.00 - 12,000.00 0.0270 M3 Pasir Pasang 235,000.00 - 6,345.00 1.9500 Kg Besi Beton Polos 9,000.00 - 17,550.00 Jumlah 29,375.00 98,395.00

7 Pas. Dinding Roster Bintang Wajik (10x20x30) cm M2 IV.7. 0.3000 Oh Pekerja 60,000.00 18,000.00 - 0.1000 Oh Tukang Batu 80,000.00 8,000.00 - 0.0100 Oh Kepala Tukang 90,000.00 900.00 - 0.0150 Oh Mandor 85,000.00 1,275.00 - 17.0000 Bh Roster 3,850.00 - 65,450.00 0.2560 Zak Semen Ex. Tonasa 80,000.00 - 20,480.00 0.0350 M3 Pasir Pasang 235,000.00 - 8,225.00 Jumlah 28,175.00 94,155.00

8 Pasangan Bata Merah Tebal 1/2 Batu 1Pc : 2Ps M2 IV.8.0.320 Oh Pekerja 60,000.00 19,200.00 - 0.100 Oh Tukang Batu 80,000.00 - 8,000.00 0.010 Oh Kepala Tukang 90,000.00 - 900.00 0.015 Oh Mandor 85,000.00 - 1,275.00

50.000 Bh Bata Merah 900.00 45,000.00 - 18.950 Kg Semen Ex. Tonasa 1,600.00 30,320.00 - 0.038 M3 Pasir Pasang 235,000.00 8,930.00 -

Jumlah 103,450.00 10,175.00

9 Pasangan Bata Merah Tebal 1/2 Batu 1Pc : 4Ps M2 IV.9.0.320 Oh Pekerja 60,000.00 19,200.00 - 0.100 Oh Tukang Batu 80,000.00 - 8,000.00 0.010 Oh Kepala Tukang 90,000.00 - 900.00

SNI - 7

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan 0.015 Oh Mandor 85,000.00 - 1,275.00

50.000 Bh Bata Merah 900.00 45,000.00 - 11.500 Kg Semen Ex. Tonasa 1,600.00 18,400.00 - 0.043 M3 Pasir Pasang 235,000.00 10,105.00 -

Jumlah 92,705.00 10,175.00

V. PEKERJAAN PLESTERAN 1 Plesteran 1Pc : 1Psr, Tebal 15 mm M2 V.1.

0.2000 Oh Pekerja 60,000.00 12,000.00 - 0.1500 Oh Tukang Batu 80,000.00 12,000.00 - 0.0150 Oh Kepala Tukang 90,000.00 1,350.00 - 0.0100 Oh Mandor 85,000.00 850.00 - 12.9200 Kg Semen Ex. Tonasa 1,600.00 - 20,672.00 0.0130 M3 Pasir Pasang 235,000.00 - 3,055.00 Jumlah 26,200.00 23,727.00

2 Plesteran 1Pc : 2Psr, Tebal 15 mm M2 V.2. 0.2000 Oh Pekerja 60,000.00 12,000.00 - 0.1500 Oh Tukang Batu 80,000.00 12,000.00 - 0.0150 Oh Kepala Tukang 90,000.00 1,350.00 - 0.0100 Oh Mandor 85,000.00 850.00 - 8.5200 Kg Semen Ex. Tonasa 1,600.00 - 13,632.00 0.0170 M3 Pasir Pasang 235,000.00 - 3,995.00 Jumlah 26,200.00 17,627.00

3 Plesteran 1Pc : 3Psr, Tebal 15 mm M2 V.3. 0.2000 Oh Pekerja 60,000.00 12,000.00 - 0.1500 Oh Tukang Batu 80,000.00 12,000.00 - 0.0150 Oh Kepala Tukang 90,000.00 1,350.00 - 0.0100 Oh Mandor 85,000.00 850.00 - 6.4800 Kg Semen Ex. Tonasa 1,600.00 - 10,368.00 0.0190 M3 Pasir Pasang 235,000.00 - 4,465.00 Jumlah 26,200.00 14,833.00

4 Plesteran 1Pc : 4Psr, Tebal 15 mm M2 V.4. 0.2000 Oh Pekerja 60,000.00 12,000.00 - 0.1500 Oh Tukang Batu 80,000.00 12,000.00 - 0.0150 Oh Kepala Tukang 90,000.00 1,350.00 - 0.0100 Oh Mandor 85,000.00 850.00 - 5.2000 Kg Semen Ex. Tonasa 1,600.00 - 8,320.00 0.0200 M3 Pasir Pasang 235,000.00 - 4,700.00 Jumlah 26,200.00 13,020.00

5 Plesteran 1Pc : 5Psr, Tebal 15 mm M2 V.5. 0.2000 Oh Pekerja 60,000.00 12,000.00 - 0.1500 Oh Tukang Batu 80,000.00 12,000.00 - 0.0150 Oh Kepala Tukang 90,000.00 1,350.00 - 0.0100 Oh Mandor 85,000.00 850.00 - 4.3200 Kg Semen Ex. Tonasa 1,600.00 - 6,912.00 0.0220 M3 Pasir Pasang 235,000.00 - 5,170.00 Jumlah 26,200.00 12,082.00

6 Plesteran 1Pc : 6Psr, Tebal 15 mm M2 V.6. 0.2000 Oh Pekerja 60,000.00 12,000.00 - 0.1500 Oh Tukang Batu 80,000.00 12,000.00 - 0.0150 Oh Kepala Tukang 90,000.00 1,350.00 - 0.0100 Oh Mandor 85,000.00 850.00 - 3.6800 Kg Semen Ex. Tonasa 1,600.00 - 5,888.00 0.0230 M3 Pasir Pasang 235,000.00 - 5,405.00 Jumlah 26,200.00 11,293.00

7 Plesteran 1Pc : 8Psr, Tebal 15 mm M2 V.7. 0.2000 Oh Pekerja 60,000.00 12,000.00 - 0.1500 Oh Tukang Batu 80,000.00 12,000.00 - 0.0150 Oh Kepala Tukang 90,000.00 1,350.00 - 0.0100 Oh Mandor 85,000.00 850.00 - 2.8800 Kg Semen Ex. Tonasa 1,600.00 - 4,608.00 0.0240 M3 Pasir Pasang 235,000.00 - 5,640.00 Jumlah 26,200.00 10,248.00

8 Plesteran 1Pc : 2Psr, Tebal 20 mm M2 V.8. 0.2500 Oh Pekerja 60,000.00 15,000.00 - 0.2000 Oh Tukang Batu 80,000.00 16,000.00 - 0.0200 Oh Kepala Tukang 90,000.00 1,800.00 - 0.0125 Oh Mandor 85,000.00 1,062.50 - 14.2800 Kg Semen Ex. Tonasa 1,600.00 - 22,848.00 0.0230 M3 Pasir Pasang 235,000.00 - 5,405.00 Jumlah 33,862.50 28,253.00

9 Plesteran 1Pc : 3Psr, Tebal 20 mm M2 V.9. 0.2500 Oh Pekerja 60,000.00 15,000.00 - 0.2000 Oh Tukang Batu 80,000.00 16,000.00 - 0.0200 Oh Kepala Tukang 90,000.00 1,800.00 - 0.0125 Oh Mandor 85,000.00 1,062.50 - 10.8000 Kg Semen Ex. Tonasa 1,600.00 - 17,280.00

SNI - 8

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan 0.0260 M3 Pasir Pasang 235,000.00 - 6,110.00 Jumlah 33,862.50 23,390.00

10 Plesteran 1Pc : 4Psr, Tebal 20 mm M2 V.10. 0.2500 Oh Pekerja 60,000.00 15,000.00 - 0.2000 Oh Tukang Batu 80,000.00 16,000.00 - 0.0200 Oh Kepala Tukang 90,000.00 1,800.00 - 0.0125 Oh Mandor 85,000.00 1,062.50 - 8.6800 Kg Semen Ex. Tonasa 1,600.00 - 13,888.00 0.0280 M3 Pasir Pasang 235,000.00 - 6,580.00 Jumlah 33,862.50 20,468.00

11 Plesteran 1Pc : 5Psr, Tebal 20 mm M2 V.11. 0.2500 Oh Pekerja 60,000.00 15,000.00 - 0.2000 Oh Tukang Batu 80,000.00 16,000.00 - 0.0200 Oh Kepala Tukang 90,000.00 1,800.00 - 0.0125 Oh Mandor 85,000.00 1,062.50 - 7.2900 Kg Semen Ex. Tonasa 1,600.00 - 11,664.00 0.0280 M3 Pasir Pasang 235,000.00 - 6,580.00 Jumlah 33,862.50 18,244.00

12 Plesteran 1Pc : 6Psr, Tebal 20 mm M2 V.12. 0.2500 Oh Pekerja 60,000.00 15,000.00 - 0.2000 Oh Tukang Batu 80,000.00 16,000.00 - 0.0200 Oh Kepala Tukang 90,000.00 1,800.00 - 0.0125 Oh Mandor 85,000.00 1,062.50 - 6.2400 Kg Semen Ex. Tonasa 1,600.00 - 9,984.00 0.0300 M3 Pasir Pasang 235,000.00 - 7,050.00 Jumlah 33,862.50 17,034.00

13 Plesteran 1Pc : 2Psr, Tebal 25 mm M2 V.13. 0.3000 Oh Pekerja 60,000.00 18,000.00 - 0.2000 Oh Tukang Batu 80,000.00 16,000.00 - 0.0200 Oh Kepala Tukang 90,000.00 1,800.00 - 0.0130 Oh Mandor 85,000.00 1,105.00 - 15.5000 Kg Semen Ex. Tonasa 1,600.00 - 24,800.00 0.0130 M3 Pasir Pasang 235,000.00 - 3,055.00 Jumlah 36,905.00 27,855.00

14 Plesteran 1Pc : 3Psr, Tebal 25 mm M2 V.14. 0.3000 Oh Pekerja 60,000.00 18,000.00 - 0.2000 Oh Tukang Batu 80,000.00 16,000.00 - 0.0200 Oh Kepala Tukang 90,000.00 1,800.00 - 0.0130 Oh Mandor 85,000.00 1,105.00 - 11.7500 Kg Semen Ex. Tonasa 1,600.00 - 18,800.00 0.0350 M3 Pasir Pasang 235,000.00 - 8,225.00 Jumlah 36,905.00 27,025.00

15 Plesteran 1Pc : 4Psr, Tebal 25 mm M2 V.15. 0.3000 Oh Pekerja 60,000.00 18,000.00 - 0.2000 Oh Tukang Batu 80,000.00 16,000.00 - 0.0200 Oh Kepala Tukang 90,000.00 1,800.00 - 0.0130 Oh Mandor 85,000.00 1,105.00 - 9.4800 Kg Semen Ex. Tonasa 1,600.00 - 15,168.00 0.0380 M3 Pasir Pasang 235,000.00 - 8,930.00 Jumlah 36,905.00 24,098.00

16 Plesteran 1Pc : 2Psr, Tebal 30 mm M2 V.16. 0.3200 Oh Pekerja 60,000.00 19,200.00 - 0.2500 Oh Tukang Batu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0150 Oh Mandor 85,000.00 1,275.00 - 18.6500 Kg Semen Ex. Tonasa 1,600.00 - 29,840.00 0.0350 M3 Pasir Pasang 235,000.00 - 8,225.00 Jumlah 42,725.00 38,065.00

17 Plesteran 1Pc : 3Psr, Tebal 30 mm M2 V.17. 0.3200 Oh Pekerja 60,000.00 19,200.00 - 0.2500 Oh Tukang Batu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0150 Oh Mandor 85,000.00 1,275.00 - 14.1500 Kg Semen Ex. Tonasa 1,600.00 - 22,640.00 0.0390 M3 Pasir Pasang 235,000.00 - 9,165.00 Jumlah 42,725.00 31,805.00

18 Plesteran 1Pc : 4Psr, Tebal 30 mm M2 V.18. 0.3200 Oh Pekerja 60,000.00 19,200.00 - 0.2500 Oh Tukang Batu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0150 Oh Mandor 85,000.00 1,275.00 - 11.3800 Kg Semen Ex. Tonasa 1,600.00 - 18,208.00 0.0420 M3 Pasir Pasang 235,000.00 - 9,870.00 Jumlah 42,725.00 28,078.00

19 Plesteran Beton 1Pc : 2Psr, Tebal 15 mm M2 V.19.

SNI - 9

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan 0.2600 Oh Pekerja 60,000.00 15,600.00 - 0.2000 Oh Tukang Batu 80,000.00 16,000.00 - 0.0200 Oh Kepala Tukang 90,000.00 1,800.00 - 0.0130 Oh Mandor 85,000.00 1,105.00 - 9.3000 Kg Semen Ex. Tonasa 1,600.00 - 14,880.00 0.0180 M3 Pasir Pasang 235,000.00 - 4,230.00 Jumlah 34,505.00 19,110.00

20 Plesteran Beton 1Pc : 3Psr, Tebal 15 mm M2 V.20. 0.2600 Oh Pekerja 60,000.00 15,600.00 - 0.2000 Oh Tukang Batu 80,000.00 16,000.00 - 0.0200 Oh Kepala Tukang 90,000.00 1,800.00 - 0.0130 Oh Mandor 85,000.00 1,105.00 - 7.0700 Kg Semen Ex. Tonasa 1,600.00 - 11,312.00 0.0210 M3 Pasir Pasang 235,000.00 - 4,935.00 Jumlah 34,505.00 16,247.00

21 Plesteran Skoning 1Pc : 2Psr M2 V.21. 0.0570 Oh Pekerja 60,000.00 3,420.00 - 0.0380 Oh Tukang Batu 80,000.00 3,040.00 - 0.0380 Oh Kepala Tukang 90,000.00 3,420.00 - 0.0020 Oh Mandor 85,000.00 170.00 - 0.5000 Kg Semen Ex. Tonasa 1,600.00 - 800.00 0.0020 M3 Pasir Pasang 235,000.00 - 470.00 Jumlah 10,050.00 1,270.00

22 Plesteran Siar 1Pc : 2Psr M2 V.22. 0.1500 Oh Pekerja 60,000.00 9,000.00 - 0.0700 Oh Tukang Batu 80,000.00 5,600.00 - 0.0070 Oh Kepala Tukang 90,000.00 630.00 - 0.0080 Oh Mandor 85,000.00 680.00 - 4.3200 Kg Semen Ex. Tonasa 1,600.00 - 6,912.00 0.0160 M3 Pasir Pasang 235,000.00 - 3,760.00 Jumlah 15,910.00 10,672.00

VI. PEKERJAAN KAYU 1 Pasang Kusen Pintu Dan Jendela Kayu Bangkirai M3 VI.1.

6.0000 Oh Pekerja 60,000.00 360,000.00 - 20.0000 Oh Tukang Kayu 80,000.00 1,600,000.00 - 2.0000 Oh Kepala Tukang 90,000.00 180,000.00 - 0.3000 Oh Mandor 85,000.00 25,500.00 - 1.2000 M3 Kayu Bangkirai 7,000,000.00 - 8,400,000.00 Jumlah 2,165,500.00 8,400,000.00

2 Pasang Kusen Pintu Dan Jendela Kayu Meranti M3 VI.2. 6.0000 Oh Pekerja 60,000.00 360,000.00 - 20.0000 Oh Tukang Kayu 80,000.00 1,600,000.00 - 2.0000 Oh Kepala Tukang 90,000.00 180,000.00 - 0.3000 Oh Mandor 85,000.00 25,500.00 - 1.2000 M3 Kayu Meranti 3,500,000.00 - 4,200,000.00 Jumlah 2,165,500.00 4,200,000.00

3 Pasang Pintu Klam Kayu Meranti M2 VI.3. 0.3500 Oh Pekerja 60,000.00 21,000.00 - 1.0500 Oh Tukang Kayu 80,000.00 84,000.00 - 0.1050 Oh Kepala Tukang 90,000.00 9,450.00 - 0.0180 Oh Mandor 85,000.00 1,530.00 - 0.0360 M3 Papan/Kayu Meranti 3,500,000.00 - 126,000.00 0.0500 kg Paku Biasa 15,000.00 - 750.00 Jumlah 115,980.00 126,750.00

4 Pasang Pintu Klam Kayu Bangkirai M2 VI.4. 0.3500 Oh Pekerja 60,000.00 21,000.00 - 1.0500 Oh Tukang Kayu 80,000.00 84,000.00 - 0.1050 Oh Kepala Tukang 90,000.00 9,450.00 - 0.0180 Oh Mandor 85,000.00 1,530.00 - 0.0360 M3 Papan/Kayu Bangkirai 7,000,000.00 - 252,000.00 0.0500 kg Paku Biasa 15,000.00 - 750.00 Jumlah 115,980.00 252,750.00

5 Pasang Pintu Panel Kayu Bangkirai M2 VI.5. 1.0000 Oh Pekerja 60,000.00 60,000.00 - 2.5000 Oh Tukang Kayu 80,000.00 200,000.00 - 0.2500 Oh Kepala Tukang 90,000.00 22,500.00 - 0.0500 Oh Mandor 85,000.00 4,250.00 - 0.0400 M3 Papan /Kayu Bangkirai 7,000,000.00 - 280,000.00 Jumlah 286,750.00 280,000.00

6 Pasang Jalusi Mati Kusen Kayu Bangkirai M2 VI.6. 0.5000 Oh Pekerja 60,000.00 30,000.00 - 2.0000 Oh Tukang Kayu 80,000.00 160,000.00 - 0.2000 Oh Kepala Tukang 90,000.00 18,000.00 - 0.0250 Oh Mandor 85,000.00 2,125.00 - 0.0600 M3 Papan /Kayu Bangkirai 7,000,000.00 - 420,000.00 0.1500 Kg Paku Biasa 15,000.00 - 2,250.00

SNI - 10

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan Jumlah 210,125.00 422,250.00

7 Pasang Konstruksi Kuda-kuda Kayu Bangkirai M3 VI.7. 4.0000 Oh Pekerja 60,000.00 240,000.00 - 12.0000 Oh Tukang Kayu 80,000.00 960,000.00 - 1.2000 Oh Kepala Tukang 90,000.00 108,000.00 - 0.2000 Oh Mandor 85,000.00 17,000.00 - 1.1000 M3 Kayu Bangkirai 7,000,000.00 - 7,700,000.00 0.8000 Kg Paku Biasa 15,000.00 - 12,000.00 15.0000 Kg Besi Strip 13,200.00 - 198,000.00 Jumlah 1,325,000.00 7,910,000.00

8 Pasang Gording Kayu Meranti M3 VI.8. 4.0000 Oh Pekerja 60,000.00 240,000.00 - 12.0000 Oh Tukang Kayu 80,000.00 960,000.00 - 1.2000 Oh Kepala Tukang 90,000.00 108,000.00 - 0.2000 Oh Mandor 85,000.00 17,000.00 - 1.1000 M3 Kayu Meranti 3,500,000.00 - 3,850,000.00 0.8000 Kg Paku Biasa 15,000.00 - 12,000.00 Jumlah 1,085,000.00 3,862,000.00

9 Pas. Kasau + Reng Genteng Beton Kayu Bangkirai M2 VI.9. 0.1000 Oh Pekerja 60,000.00 6,000.00 - 0.1000 Oh Tukang Kayu 80,000.00 8,000.00 - 0.0100 Oh Kepala Tukang 90,000.00 900.00 - 0.0050 Oh Mandor 85,000.00 425.00 - 0.0140 M3 Kayu Bangkirai 7,000,000.00 - 98,000.00 0.1500 Kg Paku Biasa 15,000.00 - 2,250.00 Jumlah 9,325.00 100,250.00

10 Pas. Kasau + Reng Atap Sirap Kayu Meranti M2 VI.10. 0.1200 Oh Pekerja 60,000.00 7,200.00 - 0.1200 Oh Tukang Kayu 80,000.00 9,600.00 - 0.0120 Oh Kepala Tukang 90,000.00 1,080.00 - 0.0060 Oh Mandor 85,000.00 510.00 - 0.0180 M3 Kayu Meranti 3,500,000.00 - 63,000.00 0.2000 Kg Paku Biasa 15,000.00 - 3,000.00 Jumlah 18,390.00 66,000.00

11 Pas. Rangka Langit-langit (1.00 x 1.00) m Kayu Meranti M2 VI.11. 0.1500 Oh Pekerja 60,000.00 9,000.00 - 0.2500 Oh Tukang Kayu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0750 Oh Mandor 85,000.00 6,375.00 - 0.0120 M3 Kayu Meranti 3,500,000.00 - 42,000.00 0.1000 Kg Paku Biasa 15,000.00 - 1,500.00 Jumlah 37,625.00 43,500.00

12 Pas. Rangka Langit-langit (30 x 60) cm Kayu Meranti M2 VI.12. 0.2000 Oh Pekerja 60,000.00 12,000.00 - 0.3000 Oh Tukang Kayu 80,000.00 24,000.00 - 0.0300 Oh Kepala Tukang 90,000.00 2,700.00 - 0.0100 Oh Mandor 85,000.00 850.00 - 0.0230 M3 Kayu Meranti 3,500,000.00 - 80,500.00 0.1500 Kg Paku Biasa 15,000.00 - 2,250.00 Jumlah 39,550.00 82,750.00

13 Pas. Rangka Langit-langit (30 x 30) cm Kayu Meranti M2 VI.13. 0.2500 Oh Pekerja 60,000.00 15,000.00 - 0.3500 Oh Tukang Kayu 80,000.00 28,000.00 - 0.0350 Oh Kepala Tukang 90,000.00 3,150.00 - 0.0125 Oh Mandor 85,000.00 1,062.50 - 0.0270 M3 Kayu Meranti 3,500,000.00 - 94,500.00 0.2000 Kg Paku Biasa 15,000.00 - 3,000.00 Jumlah 47,212.50 97,500.00

14 Pas. Listplank Kayu Bangkirai M2 VI.14. 0.1000 Oh Pekerja 60,000.00 6,000.00 - 0.2000 Oh Tukang Kayu 80,000.00 16,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0050 Oh Mandor 85,000.00 425.00 - 0.0072 M3 Papan/ Kayu Bangkirai 7,000,000.00 - 50,400.00 0.0500 Kg Paku Biasa 15,000.00 - 750.00 Jumlah 24,675.00 51,150.00

15 Pas. Listplank Ukuran (3 x 30) cm Kayu Bangkirai M2 VI.15. 0.1100 Oh Pekerja 60,000.00 6,600.00 - 0.2200 Oh Tukang Kayu 80,000.00 17,600.00 - 0.0220 Oh Kepala Tukang 90,000.00 1,980.00 - 0.0050 Oh Mandor 85,000.00 425.00 - 0.0110 M3 Papan Kayu Bangkirai 7,000,000.00 - 77,000.00 0.0500 Kg Paku Biasa 15,000.00 - 750.00 Jumlah 20,005.00 77,750.00

15 Pas. Listplank Ukuran 2 x (3 x 20) cm Kayu Bangkirai M2 VI.15.

SNI - 11

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan 0.1500 Oh Pekerja 60,000.00 9,000.00 - 0.2500 Oh Tukang Kayu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0750 Oh Mandor 85,000.00 6,375.00 - 0.0145 M3 Papan Kayu Bangkirai 7,000,000.00 - 101,500.00 0.0600 Kg Paku Biasa 15,000.00 - 900.00 Jumlah 28,625.00 102,400.00

16 Pas. Listplank Ukuran 2x (2 x 20) cm Kayu Bangkirai M2 VI.17. 0.1000 Oh Pekerja 60,000.00 6,000.00 - 0.1000 Oh Tukang Kayu 80,000.00 8,000.00 - 0.0100 Oh Kepala Tukang 90,000.00 900.00 - 0.0500 Oh Mandor 85,000.00 4,250.00 - 0.0086 M3 Papan Kayu Bangkirai 7,000,000.00 - 60,200.00 0.0600 Kg Paku Biasa 15,000.00 - 900.00 Jumlah 13,150.00 61,100.00

15 Pasang List Plafond Kayu Profil M2 VI.15. 0.0210 Oh Pekerja 60,000.00 1,260.00 - 0.0210 Oh Tukang Kayu 80,000.00 1,680.00 - 0.0020 Oh Kepala Tukang 90,000.00 180.00 - 0.0010 Oh Mandor 85,000.00 85.00 - 1.0500 M' Kayu Profil 15,000.00 - 15,750.00 Jumlah 3,205.00 15,750.00

16 Pekerjaan Lantai Jembatan Papan Meranti Yang Dipaku M2 VI.16. Diatas Gelagar 0.1000 Oh Pekerja 60,000.00 6,000.00 - 0.2500 Oh Tukang Kayu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0050 Oh Mandor 85,000.00 425.00 - 0.0250 M3 Papan Meranti 3,500,000.00 87,500.00 - 0.4000 Kg Paku Biasa 15,000.00 6,000.00 -

Jumlah 122,175.00 -

17 Pekerjaan Lantai Jembatan Papan Ulin Yang Dipaku M2 VI.17. Diatas Gelagar 0.1000 Oh Pekerja 60,000.00 6,000.00 - 0.2500 Oh Tukang Kayu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0050 Oh Mandor 85,000.00 425.00 - 0.0310 M3 Papan Ulin 5,500,000.00 170,500.00 - 0.4000 Kg Paku Biasa 15,000.00 6,000.00 -

Jumlah 205,175.00 -

18 Pekerjaan Kayu Kasar Ulin M3 VI.18. 2.5000 Oh Pekerja 60,000.00 150,000.00 - 7.5000 Oh Tukang Kayu 80,000.00 600,000.00 - 0.7500 Oh Kepala Tukang 90,000.00 67,500.00 - 0.1250 Oh Mandor 85,000.00 10,625.00 - 1.1000 M3 Kayu Ulin 6,000,000.00 6,600,000.00 - 3.0000 Kg Paku Ulin 24,500.00 73,500.00 -

Jumlah 7,501,625.00 -

19 Pekerjaan Kayu Kasar Bangkirai M3 VI.19. 2.5000 Oh Pekerja 60,000.00 150,000.00 - 7.5000 Oh Tukang Kayu 80,000.00 600,000.00 - 0.7500 Oh Kepala Tukang 90,000.00 67,500.00 - 0.1250 Oh Mandor 85,000.00 10,625.00 - 1.1000 M3 Kayu Bangkirai 7,000,000.00 7,700,000.00 - 3.0000 Kg Paku Biasa 15,000.00 45,000.00 -

Jumlah 8,573,125.00 -

20 Pekerjaan Kayu Kasar Meranti M3 VI.20. 2.5000 Oh Pekerja 60,000.00 150,000.00 - 7.5000 Oh Tukang Kayu 80,000.00 600,000.00 - 0.7500 Oh Kepala Tukang 90,000.00 67,500.00 - 0.1250 Oh Mandor 85,000.00 10,625.00 - 1.1000 M3 Kayu meranti 3,500,000.00 3,850,000.00 - 3.0000 Kg Paku Biasa 15,000.00 45,000.00 -

Jumlah 4,723,125.00 -

21 Pekerjaan Kaca Mati Tebal 5 mm M3 VI.21. 0.0150 Oh Pekerja 60,000.00 900.00 - 0.1500 Oh Tukang Kayu 80,000.00 12,000.00 - 0.0150 Oh Kepala Tukang 90,000.00 1,350.00 - 0.0008 Oh Mandor 85,000.00 63.75 - 1.1000 M2 Kaca 5 mm 135,000.00 148,500.00 -

Jumlah 162,813.75 -

VII. PEKERJAAN BETON

1 Beton Tumbuk 1Pc : 3Psr : 5Kr M3 VII.1. 1.6500 Oh Pekerja 60,000.00 99,000.00 - 0.2500 Oh Tukang Batu 80,000.00 20,000.00 -

SNI - 12

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0800 Oh Mandor 85,000.00 6,800.00 - 0.5200 M3 Pasir Beton 312,500.00 - 162,500.00 0.8700 M3 Koral Beton 380,600.00 - 331,122.00 218.0000 Kg Semen Ex. Tonasa 1,600.00 - 348,800.00 Jumlah 128,050.00 842,422.00

2 Beton Tumbuk 1Pc : 3Psr : 6Kr M3 VII.2. 1.6500 Oh Pekerja 60,000.00 99,000.00 - 0.2500 Oh Tukang Batu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0800 Oh Mandor 85,000.00 6,800.00 - 0.4700 M3 Pasir Beton 312,500.00 - 146,875.00 0.9400 M3 Koral Beton 380,600.00 - 357,764.00 197.0000 Kg Semen Ex. Tonasa 1,600.00 - 315,200.00 Jumlah 128,050.00 819,839.00

3 Beton Tumbuk 1Pc : 4Psr : 6Kr M3 VII.3. 1.6500 Oh Pekerja 60,000.00 99,000.00 - 0.2500 Oh Tukang Batu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0800 Oh Mandor 85,000.00 6,800.00 - 0.5700 M3 Pasir Beton 312,500.00 - 178,125.00 0.8700 M3 Koral Beton 380,600.00 - 331,122.00 173.0000 Kg Semen Ex. Tonasa 1,600.00 - 276,800.00 Jumlah 128,050.00 786,047.00

4 Lantai Kerja Beton Tumbuk 1Pc : 3Psr : 5Kr Tebal 5 cm M3 VII.4. 1.1500 Oh Pekerja 60,000.00 69,000.00 - 0.0200 Oh Tukang Batu 80,000.00 1,600.00 - 0.0020 Oh Kepala Tukang 90,000.00 180.00 - 0.0060 Oh Mandor 85,000.00 510.00 - 0.0260 M3 Pasir Beton 312,500.00 - 8,125.00 0.0440 M3 Koral Beton 380,600.00 - 16,746.40 10.0000 Kg Semen Ex. Tonasa 1,600.00 - 16,000.00 Jumlah 71,290.00 40,871.40

5 Beton Bertulang 1Pc : 2Psr : 3Kr M3 VII.5. 1.6500 Oh Pekerja 60,000.00 99,000.00 - 0.2500 Oh Tukang Batu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0800 Oh Mandor 85,000.00 6,800.00 - 0.5200 M3 Pasir Beton 312,500.00 - 162,500.00 0.7800 M3 Koral Beton 380,600.00 - 296,868.00 232.0000 Kg Semen Ex. Tonasa 1,600.00 - 371,200.00 Jumlah 128,050.00 830,568.00

6 Beton Bertulang 1Pc : 2Psr : 4Kr M3 VII.6. 1.6500 Oh Pekerja 60,000.00 99,000.00 - 0.2500 Oh Tukang Batu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0800 Oh Mandor 85,000.00 6,800.00 - 0.4500 M3 Pasir Beton 312,500.00 - 140,625.00 0.9000 M3 Koral Beton 380,600.00 - 342,540.00 280.0000 Kg Semen Ex. Tonasa 1,600.00 - 448,000.00 Jumlah 128,050.00 931,165.00

7 Beton Bertulang 1Pc : 2Psr : 2,5Kr M3 VII.7. 1.6500 Oh Pekerja 60,000.00 99,000.00 - 0.2500 Oh Tukang Batu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0800 Oh Mandor 85,000.00 6,800.00 - 0.5600 M3 Pasir Beton 312,500.00 - 175,000.00 0.7000 M3 Koral Beton 380,600.00 - 266,420.00 352.0000 Kg Semen Ex. Tonasa 1,600.00 - 563,200.00 Jumlah 128,050.00 1,004,620.00

8 Beton Bertulang 1Pc : 1,5Psr : 3Kr M3 VII.8. 1.6500 Oh Pekerja 60,000.00 99,000.00 - 0.2500 Oh Tukang Batu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0800 Oh Mandor 85,000.00 6,800.00 - 0.4200 M3 Pasir Beton 312,500.00 - 131,250.00 0.5400 M3 Koral Beton 380,600.00 - 205,524.00 357.0000 Kg Semen Ex. Tonasa 1,600.00 - 571,200.00 Jumlah 128,050.00 907,974.00

9 Beton Bertulang 1Pc : 1,5Psr : 2,5Kr M3 VII.9. 1.6500 Oh Pekerja 60,000.00 99,000.00 - 0.2500 Oh Tukang Batu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0800 Oh Mandor 85,000.00 6,800.00 - 0.4700 M3 Pasir Beton 312,500.00 - 146,875.00 0.7800 M3 Koral Beton 380,600.00 - 296,868.00 386.0000 Kg Semen Ex. Tonasa 1,600.00 - 617,600.00

SNI - 13

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan Jumlah 128,050.00 1,061,343.00

10 Beton Bertulang 1Pc : 1Psr : 2Kr M3 VII.10. 1.6500 Oh Pekerja 60,000.00 99,000.00 - 0.2500 Oh Tukang Batu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0800 Oh Mandor 85,000.00 6,800.00 - 0.3700 M3 Pasir Beton 312,500.00 - 115,625.00 0.7400 M3 Koral Beton 380,600.00 - 281,644.00 479.0000 Kg Semen Ex. Tonasa 1,600.00 - 766,400.00 Jumlah 128,050.00 1,163,669.00

11 Beton Bertulang K 175 M3 VII.11. 3.9000 Oh Pekerja 60,000.00 234,000.00 - 0.6375 Oh Tukang Batu 80,000.00 51,000.00 - 0.2000 Oh Kepala Tukang 90,000.00 18,000.00 - 0.0675 Oh Mandor 85,000.00 5,737.50 - 0.5500 M3 Pasir Pasang 235,000.00 - 129,250.00 0.8300 M3 Koral Beton 380,600.00 - 315,898.00 340.0000 Kg Semen Ex. Tonasa 1,600.00 - 544,000.00 Jumlah 308,737.50 989,148.00

12 Beton Bertulang K 225 M3 VII.12. 3.9000 Oh Pekerja 60,000.00 234,000.00 - 0.6375 Oh Tukang Batu 80,000.00 51,000.00 - 0.2000 Oh Kepala Tukang 90,000.00 18,000.00 - 0.0675 Oh Mandor 85,000.00 5,737.50 - 0.4900 M3 Pasir Beton 312,500.00 - 153,125.00 0.8100 M3 Koral Beton 380,600.00 - 308,286.00 378.0000 Kg Semen Ex. Tonasa 1,600.00 - 604,800.00 Jumlah 308,737.50 1,066,211.00

13 Beton Bertulang K 300 M3 VII.13. 3.9000 Oh Pekerja 60,000.00 234,000.00 - 0.6375 Oh Tukang Batu 80,000.00 51,000.00 - 0.2000 Oh Kepala Tukang 90,000.00 18,000.00 - 0.0675 Oh Mandor 85,000.00 5,737.50 - 0.4900 M3 Pasir Beton 312,500.00 - 153,125.00 0.8200 M3 Koral Beton 380,600.00 - 312,092.00 411.5000 Kg Semen Ex. Tonasa 1,600.00 - 658,400.00 Jumlah 308,737.50 1,123,617.00

14 Beton Bertulang K 350 M3 VII.14. 3.9000 Oh Pekerja 60,000.00 234,000.00 - 0.6375 Oh Tukang Batu 80,000.00 51,000.00 - 0.2000 Oh Kepala Tukang 90,000.00 18,000.00 - 0.0675 Oh Mandor 85,000.00 5,737.50 - 0.4200 M3 Pasir Beton 312,500.00 - 131,250.00 0.8000 M3 Koral Beton 380,600.00 - 304,480.00 445.0000 Kg Semen Ex. Tonasa 1,600.00 - 712,000.00 Jumlah 308,737.50 1,147,730.00

15 Pembesian Dengan Besi Polos Kg VII.15. 0.0070 Oh Pekerja 60,000.00 420.00 - 0.0070 Oh Tukang Besi 80,000.00 560.00 - 0.0007 Oh Kepala Tukang 90,000.00 63.00 - 0.0003 Oh Mandor 85,000.00 25.50 - 1.0500 Kg Besi Beton Polos 9,000.00 - 9,450.00 0.0150 Kg Kawat Beton 23,500.00 - 352.50 Jumlah 1,068.50 9,802.50

16 Pembesian Dengan Besi Ulir Kg VII.16. 0.0070 Oh Pekerja 60,000.00 420.00 - 0.0070 Oh Tukang Besi 80,000.00 560.00 - 0.0007 Oh Kepala Tukang 90,000.00 63.00 - 0.0003 Oh Mandor 85,000.00 25.50 - 1.0500 Kg Besi beton ulir 9,700.00 - 10,185.00 0.0150 Kg Kawat Beton 23,500.00 - 352.50 Jumlah 1,068.50 10,537.50

17 Pasang Bekisting Untuk Pondasi M2 VII.17. 0.3000 Oh Pekerja 60,000.00 18,000.00 - 0.2600 Oh Tukang Kayu 80,000.00 20,800.00 - 0.0260 Oh Kepala Tukang 90,000.00 2,340.00 - 0.0050 Oh Mandor 85,000.00 425.00 - 0.0400 M3 Kayu Meranti 3,500,000.00 - 140,000.00 0.3000 Kg Paku Biasa 23,500.00 - 7,050.00 0.1000 Ltr Minyak Bekisting 15,000.00 - 1,500.00 Jumlah 41,565.00 148,550.00

18 Pasang Bekisting Untuk Sloof M2 VII.18. 0.3000 Oh Pekerja 60,000.00 18,000.00 - 0.2600 Oh Tukang Kayu 80,000.00 20,800.00 - 0.0260 Oh Kepala Tukang 90,000.00 2,340.00 - 0.0050 Oh Mandor 85,000.00 425.00 -

SNI - 14

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan 0.0450 M3 Kayu Meranti 3,500,000.00 - 157,500.00 0.3000 Kg Paku Biasa 23,500.00 - 7,050.00 0.1000 Ltr Minyak Bekisting 15,000.00 - 1,500.00 Jumlah 41,565.00 166,050.00

19 Pasang Bekisting Untuk Kolom M2 VII.19. 0.3000 Oh Pekerja 60,000.00 18,000.00 - 0.3300 Oh Tukang Kayu 80,000.00 26,400.00 - 0.0330 Oh Kepala Tukang 90,000.00 2,970.00 - 0.0060 Oh Mandor 85,000.00 510.00 - 0.0550 M3 Kayu Meranti 3,500,000.00 - 192,500.00 0.4000 Kg Paku Biasa 23,500.00 - 9,400.00 0.3500 Lbr Plywood Tebal 9 mm 100,000.00 - 35,000.00 2.0000 Btg Dolken Kayu Galam Dia. 8 - 4 m 70,000.00 - 140,000.00 0.2000 Ltr Minyak Bekisting 15,000.00 - 3,000.00 Jumlah 47,880.00 379,900.00

20 Pasang Bekisting Untuk Balok M2 VII.20 0.3200 Oh Pekerja 60,000.00 19,200.00 - 0.3300 Oh Tukang Kayu 80,000.00 26,400.00 - 0.0330 Oh Kepala Tukang 90,000.00 2,970.00 - 0.0060 Oh Mandor 85,000.00 510.00 - 0.0580 M3 Kayu Meranti 3,500,000.00 - 203,000.00 0.4000 Kg Paku Biasa 23,500.00 - 9,400.00 0.3500 Lbr Plywood Tebal 9 mm 100,000.00 - 35,000.00 2.0000 Btg Dolken Kayu Galam Dia. 8 - 4 m 70,000.00 - 140,000.00 0.2000 Ltr Minyak Bekisting 15,000.00 - 3,000.00 Jumlah 49,080.00 390,400.00

21 Pasang Bekisting Untuk Lantai M2 VII.21. 0.3200 Oh Pekerja 60,000.00 19,200.00 - 0.3300 Oh Tukang Kayu 80,000.00 26,400.00 - 0.0330 Oh Kepala Tukang 90,000.00 2,970.00 - 0.0060 Oh Mandor 85,000.00 510.00 - 0.0550 M3 Kayu Meranti 3,500,000.00 - 192,500.00 0.4000 Kg Paku Biasa 23,500.00 - 9,400.00 0.3500 Lbr Plywood Tebal 9 mm 100,000.00 - 35,000.00 6.0000 Btg Dolken Kayu Galam Dia. 8 - 4 m 70,000.00 - 420,000.00 0.2000 Ltr Minyak Bekisting 1,600.00 - 320.00 Jumlah 49,080.00 657,220.00

22 Pasang Bekisting Untuk Tangga M2 VII.22. 0.3200 Oh Pekerja 60,000.00 19,200.00 - 0.3300 Oh Tukang Kayu 80,000.00 26,400.00 - 0.0330 Oh Kepala Tukang 90,000.00 2,970.00 - 0.0060 Oh Mandor 85,000.00 510.00 - 0.0450 M3 Kayu Meranti 3,500,000.00 - 157,500.00 0.4000 Kg Paku Biasa 23,500.00 - 9,400.00 0.3500 Lbr Plywood Tebal 9 mm 100,000.00 - 35,000.00 2.0000 Btg Dolken Kayu Galam Dia. 8 - 4 m 70,000.00 - 140,000.00 0.2000 Ltr Minyak Bekisting 1,600.00 - 320.00 Jumlah 49,080.00 342,220.00

23 Pondasi Beton Bertulang (150 Kg Besi + Bekisting) M3 VII.23. 3.9000 Oh Pekerja 60,000.00 234,000.00 - 0.3500 Oh Tukang Batu 80,000.00 28,000.00 - 1.0400 Oh Tukang Kayu 80,000.00 83,200.00 - 1.0500 Oh Tukang Besi 80,000.00 84,000.00 - 0.2450 Oh Kepala Tukang 90,000.00 22,050.00 - 0.1650 Oh Mandor 85,000.00 14,025.00 - 0.2000 M3 Kayu Meranti 3,500,000.00 - 700,000.00 1.5000 Kg Paku Biasa 23,500.00 - 35,250.00 0.4000 Ltr Minyak Bekisting 1,600.00 - 640.00 150.0000 Kg Besi Beton Polos 9,000.00 - 1,350,000.00 2.2500 Kg Kawat Beton 23,500.00 - 52,875.00 323.0000 Kg Semen Ex. Tonasa 1,600.00 - 516,800.00 0.5200 M3 Pasir Beton 312,500.00 - 162,500.00 0.7800 M3 Koral Beton 380,600.00 - 296,868.00 Jumlah 465,275.00 3,114,933.00

24 Sloof Beton Bertulang (200 Kg Besi + Bekisting) M3 VII.24. 4.8500 Oh Pekerja 60,000.00 291,000.00 - 0.3500 Oh Tukang Batu 80,000.00 28,000.00 - 1.5600 Oh Tukang Kayu 80,000.00 124,800.00 - 1.4000 Oh Tukang Besi 80,000.00 112,000.00 - 0.3310 Oh Kepala Tukang 90,000.00 29,790.00 - 0.1700 Oh Mandor 85,000.00 14,450.00 - 0.2700 M3 Kayu Meranti 3,500,000.00 - 945,000.00 2.0000 Kg Paku Biasa 23,500.00 - 47,000.00 0.6000 Ltr Minyak Bekisting 1,600.00 - 960.00 200.0000 Kg Besi Beton Polos 9,000.00 - 1,800,000.00 3.0000 Kg Kawat Beton 23,500.00 - 70,500.00 323.0000 Kg Semen Ex. Tonasa 1,600.00 - 516,800.00 0.5200 M3 Pasir Beton 312,500.00 - 162,500.00 0.7800 M3 Koral Beton 380,600.00 - 296,868.00

SNI - 15

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan Jumlah 600,040.00 3,839,628.00

25 Kolom Beton Bertulang (300 Kg Besi + Bekisting) M3 VII.25. 7.3000 Oh Pekerja 60,000.00 438,000.00 - 0.3500 Oh Tukang Batu 80,000.00 28,000.00 - 3.3000 Oh Tukang Kayu 80,000.00 264,000.00 - 2.1000 Oh Tukang Besi 80,000.00 168,000.00 - 0.5700 Oh Kepala Tukang 90,000.00 51,300.00 - 0.2500 Oh Mandor 85,000.00 21,250.00 - 0.5500 M3 Kayu Meranti 3,500,000.00 - 1,925,000.00 4.0000 Kg Paku Biasa 23,500.00 - 94,000.00 2.0000 Ltr Minyak Bekisting 1,600.00 - 3,200.00 300.0000 Kg Besi Beton Polos 9,000.00 - 2,700,000.00 4.5000 Kg Kawat Beton 23,500.00 - 105,750.00 323.0000 Kg Semen Ex. Tonasa 1,600.00 - 516,800.00 0.5200 M3 Pasir Beton 312,500.00 - 162,500.00 0.7800 M3 Koral Beton 380,600.00 - 296,868.00 3.5000 Lbr Plywood Tebal 9 mm 100,000.00 - 350,000.00 20.0000 Btg Dolken Kayu Galam Dia. 8 - 4 m 70,000.00 - 1,400,000.00 Jumlah 970,550.00 7,554,118.00

26 Balok Beton Bertulang (200 Kg Besi + Bekisting) M3 VII.26 5.9600 Oh Pekerja 60,000.00 357,600.00 - 0.3500 Oh Tukang Batu 80,000.00 28,000.00 - 2.8000 Oh Tukang Kayu 80,000.00 224,000.00 - 1.4000 Oh Tukang Besi 80,000.00 112,000.00 - 0.4550 Oh Kepala Tukang 90,000.00 40,950.00 - 0.2080 Oh Mandor 85,000.00 17,680.00 - 0.4600 M3 Kayu Meranti 3,500,000.00 - 1,610,000.00 3.2000 Kg Paku Biasa 23,500.00 - 75,200.00 1.6000 Ltr Minyak Bekisting 1,600.00 - 2,560.00 200.0000 Kg Besi Beton Polos 9,000.00 - 1,800,000.00 3.0000 Kg Kawat Beton 23,500.00 - 70,500.00 323.0000 Kg Semen Ex. Tonasa 1,600.00 - 516,800.00 0.5200 M3 Pasir Beton 312,500.00 - 162,500.00 0.7800 M3 Koral Beton 380,600.00 - 296,868.00 2.8000 Lbr Plywood Tebal 9 mm 100,000.00 - 280,000.00 16.0000 Btg Dolken Kayu Galam Dia. 8 - 4 m 70,000.00 - 1,120,000.00 Jumlah 780,230.00 5,934,428.00

27 Balok Beton Bertulang (150 Kg Besi + Bekisting) M3 VII.27 5.8000 Oh Pekerja 60,000.00 348,000.00 - 0.3500 Oh Tukang Batu 80,000.00 28,000.00 - 2.8000 Oh Tukang Kayu 80,000.00 224,000.00 - 1.0500 Oh Tukang Besi 80,000.00 84,000.00 - 0.4200 Oh Kepala Tukang 90,000.00 37,800.00 - 0.1850 Oh Mandor 85,000.00 15,725.00 - 0.4400 M3 Kayu Meranti 3,500,000.00 - 1,540,000.00 3.2000 Kg Paku Biasa 23,500.00 - 75,200.00 1.6000 Ltr Minyak Bekisting 1,600.00 - 2,560.00 150.0000 Kg Besi Beton Polos 9,000.00 - 1,350,000.00 2.2500 Kg Kawat Beton 23,500.00 - 52,875.00 323.0000 Kg Semen Ex. Tonasa 1,600.00 - 516,800.00 0.5200 M3 Pasir Beton 312,500.00 - 162,500.00 0.7800 M3 Koral Beton 380,600.00 - 296,868.00 2.8000 Lbr Plywood Tebal 9 mm 100,000.00 - 280,000.00 32.0000 Btg Dolken Kayu Galam Dia. 8 - 4 m 70,000.00 - 2,240,000.00 Jumlah 737,525.00 6,516,803.00

28 Dinding Beton Bertulang (150 Kg Besi + Bekisting) M3 VII.28. 5.6000 Oh Pekerja 60,000.00 336,000.00 - 0.3500 Oh Tukang Batu 80,000.00 28,000.00 - 2.6400 Oh Tukang Kayu 80,000.00 211,200.00 - 1.0500 Oh Tukang Besi 80,000.00 84,000.00 - 0.4000 Oh Kepala Tukang 90,000.00 36,000.00 - 0.1930 Oh Mandor 85,000.00 16,405.00 - 0.4000 M3 Kayu Meranti 3,500,000.00 - 1,400,000.00 3.2000 Kg Paku Biasa 23,500.00 - 75,200.00 1.6000 Ltr Minyak Bekisting 1,600.00 - 2,560.00 150.0000 Kg Besi Beton Polos 9,000.00 - 1,350,000.00 2.2500 Kg Kawat Beton 23,500.00 - 52,875.00 323.0000 Kg Semen Ex. Tonasa 1,600.00 - 516,800.00 0.5200 M3 Pasir Beton 312,500.00 - 162,500.00 0.7800 M3 Koral Beton 380,600.00 - 296,868.00 2.8000 Lbr Plywood Tebal 9 mm 100,000.00 - 280,000.00 24.0000 Btg Dolken Kayu Galam Dia. 8 - 4 m 70,000.00 - 1,680,000.00 Jumlah 711,605.00 5,816,803.00

29 Tangga Beton Bertulang (200 Kg Besi + Bekisting) M3 VII.29. 5.6000 Oh Pekerja 60,000.00 336,000.00 - 0.3500 Oh Tukang Batu 80,000.00 28,000.00 - 2.3000 Oh Tukang Kayu 80,000.00 184,000.00 - 1.4000 Oh Tukang Besi 80,000.00 112,000.00 - 0.4050 Oh Kepala Tukang 90,000.00 36,450.00 - 0.2020 Oh Mandor 85,000.00 17,170.00 -

SNI - 16

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan 0.3550 M3 Kayu Meranti 3,500,000.00 - 1,242,500.00 3.0000 Kg Paku Biasa 23,500.00 - 70,500.00 1.2000 Ltr Minyak Bekisting 1,600.00 - 1,920.00 200.0000 Kg Besi Beton Polos 9,000.00 - 1,800,000.00 3.0000 Kg Kawat Beton 23,500.00 - 70,500.00 323.0000 Kg Semen Ex. Tonasa 1,600.00 - 516,800.00 0.5200 M3 Pasir Beton 312,500.00 - 162,500.00 0.7800 M3 Koral Beton 380,600.00 - 296,868.00 2.5000 Lbr Plywood Tebal 9 mm 100,000.00 - 250,000.00 14.0000 Btg Dolken Kayu Galam Dia. 8 - 4 m 70,000.00 - 980,000.00 Jumlah 713,620.00 5,391,588.00

30 Kolom Penguat Beton Bertulang (11 x 11) cm M' VII.30. 0.0600 Oh Pekerja 60,000.00 3,600.00 - 0.0200 Oh Tukang Batu 80,000.00 1,600.00 - 0.0200 Oh Tukang Kayu 80,000.00 1,600.00 - 0.0200 Oh Tukang Besi 80,000.00 1,600.00 - 0.0060 Oh Kepala Tukang 90,000.00 540.00 - 0.0030 Oh Mandor 85,000.00 255.00 - 0.0020 M3 Kayu Meranti 3,500,000.00 - 7,000.00 0.0100 Kg Paku Biasa 23,500.00 - 235.00 3.0000 Kg Besi Beton Polos 9,000.00 - 27,000.00 0.4500 Kg Kawat Beton 23,500.00 - 10,575.00 4.0000 Kg Semen Ex. Tonasa 1,600.00 - 6,400.00 0.0060 M3 Pasir Beton 312,500.00 - 1,875.00 0.0090 M3 Koral Beton 380,600.00 - 3,425.40 Jumlah 9,195.00 56,510.40

31 Kolom Penguat Beton Bertulang (11 x 11) cm M3 VII.31. 4.9587 Oh Pekerja 60,000.00 297,520.66 - 1.6529 Oh Tukang Batu 80,000.00 132,231.40 - 1.6529 Oh Tukang Kayu 80,000.00 132,231.40 - 1.6529 Oh Tukang Besi 80,000.00 132,231.40 - 0.4959 Oh Kepala Tukang 90,000.00 44,628.10 - 0.2479 Oh Mandor 85,000.00 21,074.38 - 0.1653 M3 Kayu Meranti 3,500,000.00 - 578,512.40 0.8264 Kg Paku Biasa 23,500.00 - 19,421.49 247.9339 Kg Besi Beton Polos 9,000.00 - 2,231,404.96 37.1901 Kg Kawat Beton 23,500.00 - 873,966.94 330.5785 Kg Semen Ex. Tonasa 1,600.00 - 528,925.62 0.4959 M3 Pasir Beton 312,500.00 - 154,958.68 0.7438 M3 Koral Beton 380,600.00 - 283,090.91 Jumlah 759,917.36 4,670,280.99

32 Ring Balok Beton Bertulang (10 x 15) cm M' VII.32. 0.1000 Oh Pekerja 60,000.00 6,000.00 - 0.0330 Oh Tukang Batu 80,000.00 2,640.00 - 0.0330 Oh Tukang Kayu 80,000.00 2,640.00 - 0.0330 Oh Tukang Besi 80,000.00 2,640.00 - 0.0100 Oh Kepala Tukang 90,000.00 900.00 - 0.0050 Oh Mandor 85,000.00 425.00 - 0.0030 M3 Kayu Meranti 3,500,000.00 - 10,500.00 0.0200 Kg Paku Biasa 23,500.00 - 470.00 3.6000 Kg Besi Beton Polos 9,000.00 - 32,400.00 0.0500 Kg Kawat Beton 23,500.00 - 1,175.00 5.5000 Kg Semen Ex. Tonasa 1,600.00 - 8,800.00 0.0090 M3 Pasir Beton 312,500.00 - 2,812.50 0.0150 M3 Koral Beton 380,600.00 - 5,709.00 Jumlah 15,245.00 61,866.50

33 Ring Balok Beton Bertulang (10 x 15) cm M3 VII.33. 6.6667 Oh Pekerja 60,000.00 400,000.00 - 2.2000 Oh Tukang Batu 80,000.00 176,000.00 - 2.2000 Oh Tukang Kayu 80,000.00 176,000.00 - 2.2000 Oh Tukang Besi 80,000.00 176,000.00 - 0.6667 Oh Kepala Tukang 90,000.00 60,000.00 - 0.3333 Oh Mandor 85,000.00 28,333.33 - 0.2000 M3 Kayu Meranti 3,500,000.00 - 700,000.00 1.3333 Kg Paku Biasa 23,500.00 - 31,333.33 240.0000 Kg Besi Beton Polos 9,000.00 - 2,160,000.00 3.3333 Kg Kawat Beton 23,500.00 - 78,333.33 366.6667 Kg Semen Ex. Tonasa 1,600.00 - 586,666.67 0.6000 M3 Pasir Beton 312,500.00 - 187,500.00 1.0000 M3 Koral Beton 380,600.00 - 380,600.00 Jumlah 1,016,333.33 4,124,433.33

VIII. PEKERJAAN PENUTUP ATAP 1 Pasang Atap Asbes Gelombang (1,80 x 0,92 m) x 5 mm M2 VIII.1.

0.1400 Oh Pekerja 60,000.00 8,400.00 - 0.0700 Oh Tukang Kayu 80,000.00 5,600.00 - 0.0070 Oh Kepala Tukang 90,000.00 630.00 - 0.0070 Oh Mandor 85,000.00 595.00 - 0.7500 Lbr Asbes Gelombang 58,000.00 - 43,500.00 0.1200 Kg Paku Payung 24,000.00 - 2,880.00 Jumlah 15,225.00 46,380.00

SNI - 17

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan

2 Pasang Atap Genteng Beton Biasa M2 VIII.2. 0.2000 Oh Pekerja 60,000.00 12,000.00 - 0.1000 Oh Tukang Kayu 80,000.00 8,000.00 - 0.0100 Oh Kepala Tukang 90,000.00 900.00 - 0.0100 Oh Mandor 85,000.00 850.00 - 12.0000 Lbr Genteng Beton Type Garuda Natural 4,725.00 - 56,700.00 0.0300 Kg Paku Biasa 23,500.00 - 705.00 Jumlah 21,750.00 57,405.00

3 Pasang Atap Genteng Metal M2 VIII.3. 0.2000 Oh Pekerja 60,000.00 12,000.00 - 0.1000 Oh Tukang Kayu 80,000.00 8,000.00 - 0.0100 Oh Kepala Tukang 90,000.00 900.00 - 0.0100 Oh Mandor 85,000.00 850.00 - 1.3000 Lbr Genteng Metal 155,000.00 - 201,500.00 0.0300 Kg Paku Anti Karat 54,450.00 - 1,633.50 Jumlah 21,750.00 203,133.50

4 Pasang Atap Sirap M2 VIII.4. 0.1660 Oh Pekerja 60,000.00 9,960.00 - 0.2500 Oh Tukang Kayu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0080 Oh Mandor 85,000.00 680.00 - 60.0000 Lbr Sirap 500.00 - 30,000.00 0.2000 Kg Paku biasa 23,500.00 - 4,700.00 Jumlah 32,890.00 34,700.00

5 Pasang Nok Genteng Beton M' VIII.5. 0.4000 Oh Pekerja 60,000.00 24,000.00 - 0.2000 Oh Tukang Kayu 80,000.00 16,000.00 - 0.0200 Oh Kepala Tukang 90,000.00 1,800.00 - 0.0200 Oh Mandor 85,000.00 1,700.00 - 3.5000 Bh Nok Genteng Beton 7,425.00 - 25,987.50 0.0500 Kg Paku Biasa 20,000.00 - 1,000.00 10.8000 Kg Semen Ex. Tonasa 1,600.00 - 17,280.00 0.0320 M3 Pasir Pasang 235,000.00 - 7,520.00 1.0000 Kg Semen Warna 3,250.00 - 3,250.00 Jumlah 43,500.00 55,037.50

6 Pasang Nok Genteng Metal M' VIII.6. 0.2500 Oh Pekerja 60,000.00 15,000.00 - 0.1500 Oh Tukang Kayu 80,000.00 12,000.00 - 0.0150 Oh Kepala Tukang 90,000.00 1,350.00 - 0.0130 Oh Mandor 85,000.00 1,105.00 - 1.1000 Bh Nok Genteng Metal 46,000.00 - 50,600.00 0.0500 Kg Paku Anti Karat 54,450.00 - 2,722.50 Jumlah 29,455.00 53,322.50

7 Pasang Nok Sirap M' VIII.7. 0.1250 Oh Pekerja 60,000.00 7,500.00 - 0.2500 Oh Tukang Kayu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0060 Oh Mandor 85,000.00 510.00 - 0.4000 Lbr Seng Plat BJLS 30 48,000.00 - 19,200.00 0.1100 Kg Paku Biasa 23,500.00 - 2,585.00 0.0040 M3 Kayu Meranti 3,500,000.00 - 14,000.00 Jumlah 30,260.00 35,785.00

8 Pasang Atap Seng Gelombang M2 VIII.8. 0.1200 Oh Pekerja 60,000.00 7,200.00 - 0.0600 Oh Tukang Kayu 80,000.00 4,800.00 - 0.0060 Oh Kepala Tukang 90,000.00 540.00 - 0.0060 Oh Mandor 85,000.00 510.00 - 0.7000 Lbr Seng Gelombang 100,000.00 - 70,000.00 0.0200 Kg Paku Payung 24,000.00 - 480.00 Jumlah 13,050.00 70,480.00

9 Pasang Nok Seng M' VIII.9. 0.1500 Oh Pekerja 60,000.00 9,000.00 - 0.0700 Oh Tukang Kayu 80,000.00 5,600.00 - 0.0080 Oh Kepala Tukang 90,000.00 720.00 - 0.0060 Oh Mandor 85,000.00 510.00 - 0.3000 Lbr Seng Plat BJLS 48,000.00 - 14,400.00 0.0400 Kg Paku Biasa 23,500.00 - 940.00 Jumlah 15,830.00 15,340.00

10 Pasang Aluminium Foil M2 VIII.10. 0.1500 Oh Pekerja 60,000.00 9,000.00 - 0.0500 Oh Tukang Kayu 80,000.00 4,000.00 - 0.0050 Oh Kepala Tukang 90,000.00 450.00 - 0.0080 Oh Mandor 85,000.00 680.00 - 1.0500 M2 Aluminium foil 5,128.21 - 5,384.62 Jumlah 14,130.00 5,384.62

SNI - 18

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan

11M2 VIII.11.

0.03 oh Tukang 80,000.00 2,666.67 - 0.003 oh Kepala Kerja 90,000.00 300.00 - 0.20 oh Pekerja 60,000.00 12,000.00 - 0.01 oh Mandor 85,000.00 850.00 - 1.00 M2 Atap Spandek 138,000.00 - 138,000.00 4.00 bh Sekrup Galbani (MTEKS 10-16x16 WAF) 1,500.00 - 6,000.00

Jumlah 15,816.67 144,000.00

12M2 VIII.12.

0.03 oh Tukang 80,000.00 2,666.67 - 0.003 oh Kepala Kerja 90,000.00 300.00 - 0.20 oh Pekerja 60,000.00 12,000.00 - 0.01 oh Mandor 85,000.00 850.00 - 1.00 M2 Atap Spandek 215,000.00 - 215,000.00 4.00 bh Sekrup Galbani (MTEKS 10-16x16 WAF) 1,500.00 - 6,000.00

Jumlah 15,816.67 221,000.00

13M2 VIII.13.

0.03 oh Tukang 80,000.00 2,666.67 - 0.003 oh Kepala Kerja 90,000.00 300.00 - 0.21 oh Pekerja 60,000.00 12,600.00 - 0.01 oh Mandor 85,000.00 850.00 - 1.00 M2 Klip Lok Hi-ten 262,000.00 - 262,000.00

Jumlah 16,416.67 262,000.00

14M2 VIII.14.

0.03 oh Tukang 80,000.00 2,666.67 - 0.003 oh Kepala Kerja 90,000.00 300.00 - 0.21 oh Pekerja 60,000.00 12,600.00 - 0.01 oh Mandor 85,000.00 850.00 - 1.00 M2 Klip Lok Hi-ten 173,000.00 - 173,000.00

Jumlah 16,416.67 173,000.00

15 Pasang ridge capping/nok steel finish Zincalume m' VIII.15. 0.02 oh Tukang 80,000.00 1,600.00 - 0.002 oh Kepala Kerja 90,000.00 180.00 - 0.12 oh Pekerja 60,000.00 7,200.00 - 0.002 oh Mandor 85,000.00 170.00 - 1.00 m' Standard Capping Lysaght Zincalume 70,000.00 - 70,000.00 4.00 bh Screw C-Teks 12-14x45 HGS 1,500.00 - 6,000.00 Jumlah 9,150.00 76,000.00

IX. PEKERJAAN LANGIT-LANGIT 1 Pas. Langit-langit Plywood (30 x 60) cm Tebal 4 mm M2 IX.1.

0.1000 Oh Tukang Kayu 80,000.00 8,000.00 - 0.0100 Oh Kepala Tukang 90,000.00 900.00 - 0.0700 Oh Pekerja 60,000.00 4,200.00 - 0.0035 Oh Mandor 85,000.00 297.50 - 0.3600 Lbr Plywood Tebal 4 mm 60,000.00 - 21,600.00 0.0300 Kg Paku Triplek 24,000.00 - 720.00 Jumlah 13,397.50 22,320.00

2 Pas. Langit-langit Plywood (30 x 60) cm Tebal 6 mm M2 IX.2. 0.0700 Oh Pekerja 60,000.00 4,200.00 - 0.1000 Oh Tukang Kayu 80,000.00 8,000.00 - 0.0100 Oh Kepala Tukang 90,000.00 900.00 - 0.0035 Oh Mandor 85,000.00 297.50 - 0.3600 Lbr Plywood Tebal 6 mm 77,000.00 - 27,720.00 0.0300 Kg Paku Triplek 24,000.00 - 720.00 Jumlah 13,397.50 28,440.00

3 Pas. Langit-langit Plywood (60 x 120) cm Tebal 4 mm M2 IX.3. 0.0700 Oh Pekerja 60,000.00 4,200.00 - 0.1000 Oh Tukang Kayu 80,000.00 8,000.00 - 0.0100 Oh Kepala Tukang 90,000.00 900.00 - 0.0035 Oh Mandor 85,000.00 297.50 - 0.3750 Lbr Plywood Tebal 4 mm 60,000.00 - 22,500.00 0.0300 Kg Paku Triplek 24,000.00 - 720.00 Jumlah 13,397.50 23,220.00

4 Pas. Langit-langit Plywood (60 x 120) cm Tebal 6 mm M2 IX.4. 0.0700 Oh Pekerja 60,000.00 4,200.00 - 0.1000 Oh Tukang Kayu 80,000.00 8,000.00 - 0.0100 Oh Kepala Tukang 90,000.00 900.00 - 0.0035 Oh Mandor 85,000.00 297.50 - 0.3750 Lbr Plywood Tebal 6 mm 77,000.00 - 28,875.00 0.0300 Kg Paku Triplek 24,000.00 - 720.00 Jumlah 13,397.50 29,595.00

5 Pasang Langit-langit Akustik (60 x 120) cm + M2 IX.5.

Pasang atap steel jenis Spandek Hi-ten tebal 0,45 mm finish Zincalume

Pasang atap steel jenis Spandek Hi-ten tebal 0,45 mm finish Colorbond

Pasang atap steel jenis Klip Lok Hi-ten tebal 0,50 mm Colorbond

Pasang atap steel jenis Klip Lok Hi-ten tebal 0,50 mm Zincalume

SNI - 19

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan Rangka Alluminium 0.1500 Oh Pekerja 60,000.00 9,000.00 - 0.5000 Oh Tukang Kayu 80,000.00 40,000.00 - 0.0500 Oh Kepala Tukang 90,000.00 4,500.00 - 0.0075 Oh Mandor 85,000.00 637.50 - 1.0000 M2 Akustik 60 x 120 cm - - - 3.6000 M' Profil Aluminium T - - - 1.0000 Bh Ramset/Dyna Bolt 1,500.00 - 1,500.00 0.1500 Kg Kawat Seng Polos 23,500.00 - 3,525.00 54,137.50 5,025.00

6 Pasang List Langit-langit Kayu Profil M' IX.6. 0.0500 Oh Pekerja 60,000.00 3,000.00 - 0.0500 Oh Tukang Kayu 80,000.00 4,000.00 - 0.0050 Oh Kepala Tukang 90,000.00 450.00 - 0.0030 Oh Mandor 85,000.00 255.00 - 1.1000 M' List Kayu Profil 15,000.00 - 16,500.00 0.0100 Kg Paku 24,000.00 - 240.00 Jumlah 7,705.00 16,740.00

7 Pasang Langit-langit Akustik (60 x 120) cm + Rangka M2 IX.7. Kayu Meranti 0.3100 Oh Pekerja 60,000.00 18,600.00 - 0.4700 Oh Tukang Kayu 80,000.00 37,600.00 - 0.0470 Oh Kepala Tukang 90,000.00 4,230.00 - 0.0155 Oh Mandor 85,000.00 1,317.50 - 1.1000 M2 Akustik 60 x 120 cm - - - 0.0270 M3 Kayu Meranti 3,500,000.00 - 94,500.00 0.0600 Kg Paku 24,000.00 - 1,440.00 Jumlah 61,747.50 95,940.00

8 Langit-langit Kalsi Board, Tebal 4.5 mm M2 IX.8. 0.0700 Oh Pekerja 60,000.00 4,200.00 - 0.1000 Oh Tukang Kayu 80,000.00 8,000.00 - 0.0100 Oh Kepala Tukang 90,000.00 - 900.00 0.0035 Oh Mandor 85,000.00 - 297.50 0.3750 Lbr Kalsi Board (120x240x4.5) mm 75,000.00 28,125.00 - 0.0300 Kg Paku Sekrup 15,000.00 450.00 -

Jumlah 40,775.00 1,197.50

9 Pasang rangka Metal Ceiling M2 IX.9. 0.10 oh Tukang 80,000.00 8,000.00 - 0.01 oh Kepala Kerja 90,000.00 900.00 - 0.06 oh Pekerja 60,000.00 3,600.00 - 0.0030 oh Mandor 85,000.00 255.00 - 0.75 set Rod M5 5,000.00 - 3,750.00 0.70 Pc U Clamp Channel 10,000.00 - 7,000.00 0.84 m' C Channel 100,000.00 - 84,000.00 1.39 Pc Channel Clamp 1,000.00 - 1,390.00 1.67 m' Metal Furring 25,000.00 - 41,750.00

Jumlah 12,755.00 137,890.00

X. PEKERJAAN BESI DAN ALUMINIUM

1 Pasang Rangka Atap Baja Kg X.1. 0.0600 Oh Pekerja 60,000.00 3,600.00 - 0.0060 Oh Tukang Besi 80,000.00 480.00 - 0.0060 Oh Kepala Tukang 90,000.00 540.00 - 0.0003 Oh Mandor 85,000.00 25.50 - 1.1000 Kg Baja Profil WF 21,100.00 - 23,210.00 0.0800 Kg Meni Besi 61,500.00 - 4,920.00 Jumlah 4,645.50 28,130.00

2 Pasang Pintu Besi Baja M2 X.2. 0.6500 Oh Pekerja 60,000.00 39,000.00 - 0.6500 Oh Tukang Besi 80,000.00 52,000.00 - 0.0650 Oh Kepala Tukang 90,000.00 5,850.00 - 0.0320 Oh Mandor 85,000.00 2,720.00 - 1.0000 M2 Pintu besi 800,000.00 - 800,000.00 Jumlah 99,570.00 800,000.00

3 Pasang Jendela Besi Baja M2 X.3. 1.0500 Oh Pekerja 60,000.00 63,000.00 - 1.0500 Oh Tukang Besi 80,000.00 84,000.00 - 0.1050 Oh Kepala Tukang 90,000.00 9,450.00 - 0.0053 Oh Mandor 85,000.00 446.25 - 1.0000 M2 Jendela Besi 800,000.00 - 800,000.00 Jumlah 156,896.25 800,000.00

4 Pasang Rolling Door M2 X.4. 1.0500 Oh Pekerja 60,000.00 63,000.00 - 1.5000 Oh Tukang Besi 80,000.00 120,000.00 - 0.1050 Oh Kepala Tukang 90,000.00 9,450.00 - 0.0052 Oh Mandor 85,000.00 442.00 - 1.0000 M2 Roll Door 960,000.00 - 960,000.00

SNI - 20

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan Jumlah 192,892.00 960,000.00

5 Pasang Kawat Harmonika M2 X.5. 0.1000 Oh Pekerja 60,000.00 6,000.00 - 0.1000 Oh Tukang Kayu 80,000.00 8,000.00 - 0.0100 Oh Kepala Tukang 90,000.00 900.00 - 0.0005 Oh Mandor 85,000.00 42.50 - 1.1000 M2 Kawat Harmonika 30,854.81 - 33,940.30 0.0200 Kg Paku Biasa 1/2" 23,500.00 - 470.00 0.0018 M3 Kayu Meranti 3,500,000.00 - 6,300.00 Jumlah 14,942.50 40,710.30

6 Pasang Kawat Nyamuk M2 X.6. 0.1000 Oh Pekerja 60,000.00 6,000.00 - 0.1000 Oh Tukang Kayu 80,000.00 8,000.00 - 0.0100 Oh Kepala Tukang 90,000.00 900.00 - 0.0005 Oh Mandor 85,000.00 42.50 - 1.1000 M2 Kawat Nyamuk 19,444.44 - 21,388.89 0.0200 Kg Paku Biasa 1/2" 23,500.00 - 470.00 0.0018 M3 Kayu Meranti 3,500,000.00 - 6,300.00 Jumlah 14,942.50 28,158.89

7 Pasang Kawat Kassa M2 X.7. 0.1000 Oh Pekerja 60,000.00 6,000.00 - 0.1000 Oh Tukang Kayu 80,000.00 8,000.00 - 0.0100 Oh Kepala Tukang 90,000.00 900.00 - 0.0005 Oh Mandor 85,000.00 42.50 - 1.1000 M2 Kawat Kassa 27,777.78 - 30,555.56 0.0200 Kg Paku Biasa 23,500.00 - 470.00 0.0018 M3 Kayu Meranti 3,500,000.00 - 6,300.00 Jumlah 14,942.50 37,325.56

8 Pasang Rangka Atap Baja Ringan M2 X.8. 0.5000 Oh Pekerja 60,000.00 30,000.00 - 0.2500 Oh Tukang Besi 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0250 Oh Mandor 85,000.00 2,125.00 - 1.0000 M2 Kuda-kuda Baja Ringan 85,000.00 - 85,000.00 1.0000 M2 Reng Baja Ringan 85,000.00 - 85,000.00 1.0000 Ls Accessories 35,000.00 - 35,000.00 Jumlah 54,375.00 205,000.00

XI. PEKERJAAN PENUTUP LANTAI DAN DINDING

1 Pasang Lantai Keramik 30 x 30 cm M2 XI.1. 0.6200 Oh Pekerja 60,000.00 37,200.00 - 0.3500 Oh Tukang Batu 80,000.00 28,000.00 - 0.0350 Oh Kepala Tukang 90,000.00 3,150.00 - 0.0300 Oh Mandor 85,000.00 2,550.00 - 12.0000 Bh Keramik 30 x 30 cm 3,804.17 - 45,650.00 11.3800 Kg Semen ex Tonasa 1,600.00 - 18,208.00 1.5000 Kg Semen warna 3,250.00 - 4,875.00 0.0420 M3 Pasir Pasang 235,000.00 - 9,870.00 Jumlah 70,900.00 78,603.00

2 Pasang Lantai Keramik 20 x 20 cm M2 XI.2. 0.6200 Oh Pekerja 60,000.00 37,200.00 - 0.3500 Oh Tukang Batu 80,000.00 28,000.00 - 0.0350 Oh Kepala Tukang 90,000.00 3,150.00 - 0.0300 Oh Mandor 85,000.00 2,550.00 - 25.0000 Bh Keramik 20 x 20 cm 2,464.00 - 61,600.00 11.3800 Kg Semen Ex.Tonasa 1,600.00 - 18,208.00 1.5000 Kg Semen Warna 3,250.00 - 4,875.00 0.0420 M3 Pasir Pasang 235,000.00 - 9,870.00 Jumlah 70,900.00 94,553.00

3 Pasang Lantai Keramik 10 x 20 cm M2 XI.3. 0.6200 Oh Pekerja 60,000.00 37,200.00 - 0.3500 Oh Tukang Batu 80,000.00 28,000.00 - 0.0350 Oh Kepala Tukang 90,000.00 3,150.00 - 0.0300 Oh Mandor 85,000.00 2,550.00 - 50.0000 Bh Keramik 10 x 20 cm 1,232.00 - 61,600.00 11.3800 Kg Semen Ex.Tonasa 1,600.00 - 18,208.00 1.5000 Kg Semen Warna 3,250.00 - 4,875.00 0.0420 M3 Pasir Pasang 235,000.00 - 9,870.00 Jumlah 70,900.00 94,553.00

4 Pasang Plint Keramik 10 x 20 cm M' XI.4. 0.0900 Oh Pekerja 60,000.00 5,400.00 - 0.0900 Oh Tukang Batu 80,000.00 7,200.00 - 0.0090 Oh Kepala Tukang 90,000.00 810.00 - 0.0045 Oh Mandor 85,000.00 382.50 - 5.0000 Bh Keramik 10 x 20 cm 1,232.00 - 6,160.00 1.6500 Kg Semen Ex.Tonasa 1,600.00 - 2,640.00 0.1000 Kg Semen Warna 3,250.00 - 325.00

SNI - 21

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan 0.0032 M3 Pasir Pasang 235,000.00 - 752.00 Jumlah 13,792.50 9,877.00

5 Pasang Lantai Keramik 15 x 15 cm M2 XI.5. 0.6200 Oh Pekerja 60,000.00 37,200.00 - 0.3500 Oh Tukang Batu 80,000.00 28,000.00 - 0.0350 Oh Kepala Tukang 90,000.00 3,150.00 - 0.0300 Oh Mandor 85,000.00 2,550.00 - 44.0000 Bh Keramik 15 x 15 cm 1,275.00 - 56,100.00 0.0420 Kg Semen Ex.Tonasa 1,600.00 - 67.20 1.5000 Kg Semen Warna 3,250.00 - 4,875.00 0.0420 M3 Pasir Pasang 235,000.00 - 9,870.00 Jumlah 70,900.00 70,912.20

6 Pasang Dinding Keramik 10 x 20 cm M2 XI.6. 0.6000 Oh Pekerja 60,000.00 36,000.00 - 0.4500 Oh Tukang Batu 80,000.00 36,000.00 - 0.0450 Oh Kepala Tukang 90,000.00 4,050.00 - 0.0300 Oh Mandor 85,000.00 2,550.00 - 50.0000 Bh Keramik 10 x 20 cm 1,232.00 - 61,600.00 9.3000 Kg Semen Ex.Tonasa 1,600.00 - 14,880.00 1.5000 Kg Semen Warna 3,250.00 - 4,875.00 0.0180 M3 Pasir Pasang 235,000.00 - 4,230.00 Jumlah 78,600.00 85,585.00

7 Pasang Dinding Keramik 20 x 20 cm M2 XI.7. 0.6000 Oh Pekerja 60,000.00 36,000.00 - 0.4500 Oh Tukang Batu 80,000.00 36,000.00 - 0.0450 Oh Kepala Tukang 90,000.00 4,050.00 - 0.0300 Oh Mandor 85,000.00 2,550.00 - 25.0000 Bh Keramik 20 x 20 cm 2,301.20 - 57,530.00 9.3000 Kg Semen Ex.Tonasa 1,600.00 - 14,880.00 1.5000 Kg Semen Warna 3,250.00 - 4,875.00 0.0180 M3 Pasir Pasang 235,000.00 - 4,230.00 Jumlah 78,600.00 81,515.00

8 Pasang Dinding Bata Klinker 5 x 5 x 24 cm M2 XI.8. 0.6200 Oh Pekerja 60,000.00 37,200.00 - 0.3500 Oh Tukang Batu 80,000.00 28,000.00 - 0.0350 Oh Kepala Tukang 90,000.00 3,150.00 - 0.0300 Oh Mandor 85,000.00 2,550.00 - 80.0000 Bh Bata Klinker 4,000.00 - 320,000.00 12.4400 Kg Semen Ex.Tonasa 1,600.00 - 19,904.00 0.0250 M3 Pasir Pasang 235,000.00 - 5,875.00 Jumlah 70,900.00 345,779.00

9 Pasang Floor Hardener M2 XI.9. 0.1200 Oh Pekerja 60,000.00 7,200.00 - 0.1200 Oh Tukang Batu 80,000.00 9,600.00 - 0.0120 Oh Kepala Tukang 90,000.00 1,080.00 - 0.0060 Oh Mandor 85,000.00 510.00 - 3.0000 Kg Floor Hardener 25,000.00 - 75,000.00 Jumlah 18,390.00 75,000.00

10 Pasang Plint Kayu 2 x 10 cm M2 XI.10. 0.1200 Oh Pekerja 60,000.00 7,200.00 - 0.1200 Oh Tukang Kayu 80,000.00 9,600.00 - 0.0120 Oh Kepala Tukang 90,000.00 1,080.00 - 0.0060 Oh Mandor 85,000.00 510.00 - 0.0024 M3 Papan Kayu Bangkirai 7,000,000.00 - 16,800.00 0.0500 Kg Paku Skrup 25,000.00 - 1,250.00 Jumlah 18,390.00 18,050.00

11 #REF! M2 XI.11. 0.4300 Oh Pekerja 60,000.00 25,800.00 - 0.2000 Oh Tukang Batu 80,000.00 16,000.00 - 0.0350 Oh Kepala Tukang 90,000.00 3,150.00 - 0.0300 Oh Mandor 85,000.00 2,550.00 - 6.0000 Bh Keramik 30 x 30 cm 3,804.17 - 22,825.00 1.0000 Zak Koral sikat hitam / warna 120,000.00 120,000.00 11.3800 Kg Semen ex Tonasa 1,600.00 - 18,208.00 0.0420 M3 Pasir Pasang 235,000.00 - 9,870.00 Jumlah 47,500.00 170,903.00

12 #REF! M2 XI.12. 0.4300 Oh Pekerja 60,000.00 25,800.00 - 0.2000 Oh Tukang Batu 80,000.00 16,000.00 - 0.0350 Oh Kepala Tukang 90,000.00 3,150.00 - 0.0300 Oh Mandor 85,000.00 2,550.00 - 1.7000 Bh Semen Warna 3,250.00 - 5,525.00 2.0000 Zak Koral sikat hitam / warna 120,000.00 240,000.00 11.3800 Kg Semen ex Tonasa 1,600.00 - 18,208.00 0.0420 M3 Pasir Pasang 235,000.00 - 9,870.00 Jumlah 47,500.00 273,603.00

SNI - 22

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan XII. PEKERJAAN PENGECATAN

1 Mencuci Bidang Permukaan Tembok M2 XII.1. Yang Pernah Di Cat 0.1500 Oh Pekerja 60,000.00 9,000.00 - 0.0025 Oh Mandor 85,000.00 212.50 - 0.0500 Kg Sabun 15,000.00 - 750.00 Jumlah 9,212.50 750.00

2 Mengerok Karat Cat Lama Permukaan Baja Dengan M2 XII.2. Cara Manual 0.1500 Oh Pekerja 60,000.00 9,000.00 - 0.0025 Oh Mandor 85,000.00 212.50 - 0.0500 Kg Sabun 15,000.00 - 750.00 Jumlah 9,212.50 750.00

3 Pengecatan Bidang Kayu Lama M2 XII.3. 0.0700 Oh Pekerja 60,000.00 4,200.00 - 0.0750 Oh Tukang Cat 80,000.00 6,000.00 - 0.0075 Oh Kepala Tukang 90,000.00 675.00 - 0.0025 Oh Mandor 85,000.00 212.50 - 0.1500 Kg Plamir 25,000.00 - 3,750.00 0.1700 Ltr Cat Dasar 30,000.00 - 5,100.00 0.1700 Ltr Cat Penutup 49,500.00 - 8,415.00 Jumlah 11,087.50 17,265.00

4 Pengecatan Bidang Kayu Baru (1 Lapis Plamir), M2 XII.4. 1 Lapis Cat Dasar, 2 Lapis Cat Penutup 0.0700 Oh Pekerja 60,000.00 4,200.00 - 0.0090 Oh Tukang Cat 80,000.00 720.00 - 0.0060 Oh Kepala Tukang 90,000.00 540.00 - 0.0025 Oh Mandor 85,000.00 212.50 - 0.2000 Ltr Cat meni 30,000.00 - 6,000.00 0.1500 Kg Plamir 25,000.00 - 3,750.00 0.1700 Ltr Cat Dasar 30,000.00 - 5,100.00 0.2600 Ltr Cat Penutup 49,500.00 - 12,870.00 Jumlah 5,672.50 27,720.00

5 Pelaburan Bidang Kayu Dengan Teak Oil M2 XII.5. 0.0400 Oh Pekerja 60,000.00 2,400.00 - 0.0630 Oh Tukang Cat 80,000.00 5,040.00 - 0.0630 Oh Kepala Tukang 90,000.00 5,670.00 - 0.0025 Oh Mandor 85,000.00 212.50 - 0.3600 Ltr Teak oil 56,500.00 - 20,340.00 Jumlah 13,322.50 20,340.00

6 Pelaburan Bidang Kayu Dengan Cat Residu Dan Ter M2 XII.6. 0.1000 Oh Pekerja 60,000.00 6,000.00 - 0.0060 Oh Mandor 85,000.00 510.00 - 0.3500 Ltr Residu Atau Ter 15,000.00 - 5,250.00 Jumlah 6,510.00 5,250.00

7 Pelaburan Bidang Kayu Dengan Vernis M2 XII.7. 0.1600 Oh Pekerja 60,000.00 9,600.00 - 0.1600 Oh Tukang Cat 80,000.00 12,800.00 - 0.0160 Oh Kepala Tukang 90,000.00 1,440.00 - 0.0025 Oh Mandor 85,000.00 212.50 - 0.1500 Ltr Vernis 56,500.00 - 8,475.00 0.0500 Ltr Dempul 26,000.00 - 1,300.00 0.1000 Lbr Ampelas 5,000.00 - 500.00 0.0100 Bh Kuas 12,000.00 - 120.00 Jumlah 24,052.50 10,395.00

8 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis M2 XII.8. Cat Dasar, 2 Lapis Cat Penutup) 0.0200 Oh Pekerja 60,000.00 1,200.00 - 0.0630 Oh Tukang Cat 80,000.00 5,040.00 - 0.0063 Oh Kepala Tukang 90,000.00 567.00 - 0.0025 Oh Mandor 85,000.00 212.50 - 0.1000 Kg Plamir 25,000.00 - 2,500.00 0.1100 Ltr Cat Dasar 14,000.00 - 1,540.00 0.2600 Klg Cat Penutup 2 x 80,000.00 - 20,800.00 Jumlah 7,019.50 24,840.00

9 Pengecatan Tembok Lama (1 Lapis Cat Dasar, M2 XII.9. 2 Lapis Cat Penutup) 0.0280 Oh Pekerja 60,000.00 1,680.00 - 0.0420 Oh Tukang Cat 80,000.00 3,360.00 - 0.0042 Oh Kepala Tukang 90,000.00 378.00 - 0.0025 Oh Mandor 85,000.00 212.50 - 0.1200 Ltr Cat Dasar 14,000.00 - 1,680.00 0.1800 Kg Cat Penutup 2 x 80,000.00 - 14,400.00 Jumlah 5,630.50 16,080.00

10 Pengecatan Permukaan Baja Dengan Meni Besi M2 XII.10.

SNI - 23

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan 0.0200 Oh Pekerja 60,000.00 1,200.00 - 0.2000 Oh Tukang Cat 80,000.00 16,000.00 - 0.0200 Oh Kepala Tukang 90,000.00 1,800.00 - 0.0100 Oh Mandor 85,000.00 850.00 - 0.1000 Kg Meni besi 61,500.00 - 6,150.00 0.0100 Bh Kuas 12,000.00 - 120.00 Jumlah 19,850.00 6,270.00

11 Pengecatan Permukaan Baja Lapis Seng (Galbani) M2 XII.11. Secara Manual Sistem 1 Lapis Cat Mutakhir Dengan Tebal 200 um 0.0060 Oh Pekerja 60,000.00 360.00 - 0.0600 Oh Tukang Cat 80,000.00 4,800.00 - 0.0120 Oh Kepala Tukang 90,000.00 1,080.00 - 0.0060 Oh Mandor 85,000.00 510.00 - 0.3000 Kg Cat Penutup 105,000.00 - 31,500.00 Jumlah 6,750.00 31,500.00

12 Pengecatan Permukaan Baja Lapis Seng (Galbani) M2 XII.12. Secara Manual Sistem 3 Lapis Cat Konvensional Dengan Tebal 200 um 0.5000 Oh Pekerja 60,000.00 30,000.00 - 0.8000 Oh Tukang Cat 80,000.00 64,000.00 - 0.3000 Oh Kepala Tukang 90,000.00 27,000.00 - 0.2000 Oh Mandor 85,000.00 17,000.00 - 0.1100 Kg Cat Dasar 14,000.00 - 1,540.00 0.1700 Kg Cat Antara 33,000.00 - 5,610.00 0.0800 Kg Cat Penutup 105,000.00 - 8,400.00 Jumlah 138,000.00 15,550.00

13 Pengecatan Permukaan Baja Lapis Seng (Galbani) M2 XII.13. Secara Semprot (Airless Spray) Dengan Sistem 1 Lapis Mutakhir Dengan Tebal 200 um 0.4000 Oh Pekerja 60,000.00 24,000.00 - 0.7000 Oh Tukang Cat 80,000.00 56,000.00 - 0.2000 Oh Kepala Tukang 90,000.00 18,000.00 - 0.2000 Oh Mandor 85,000.00 17,000.00 - 0.3000 Kg Cat Dasar 14,000.00 - 4,200.00 Jumlah 115,000.00 4,200.00

XIII. PEKERJAAN SANITASI

1 Bh XIII.1. 2.1000 Oh Pekerja 60,000.00 126,000.00 - 0.1100 Oh Mandor 85,000.00 9,350.00 - 0.7500 Oh Tukang Batu 80,000.00 60,000.00 - 0.0700 Oh Kepala Tukang 90,000.00 6,300.00 - 1.0000 Bh Bak Teraso 296,000.00 - 296,000.00 6.0000 Kg Semen Ex. Tonasa 1,600.00 - 9,600.00 0.0100 M3 Pasir Pasang 235,000.00 - 2,350.00 Jumlah 201,650.00 307,950.00

2 Memasang Bak Mandi Batu Bata Volume 0,30 m3 Bh XIII.2. 6.0000 Oh Pekerja 60,000.00 360,000.00 - 0.3000 Oh Mandor 85,000.00 25,500.00 - 3.0000 Oh Tukang Batu 80,000.00 240,000.00 - 0.3000 Oh Kepala Tukang 90,000.00 27,000.00 - 200.0000 Bh Batu Bata 900.00 - 180,000.00 120.0000 Kg Semen Ex. Tonasa 1,600.00 - 192,000.00 0.3000 M3 Pasir Pasang 235,000.00 - 70,500.00 360.0000 Bh Keramik (11 x 11) cm 1,232.00 - 443,520.00 6.0000 Kg Semen Putih 3,250.00 - 19,500.00 Jumlah 652,500.00 905,520.00

3 Memasang Bak Kontrol Pasangan Batu Bata Bh XIII.3. Ukuran (30 x 30) cm Tinggi 35 cm 3.2000 Oh Pekerja 60,000.00 192,000.00 - 0.0160 Oh Mandor 85,000.00 1,360.00 - 1.0150 Oh Tukang Batu 80,000.00 81,200.00 - 0.0015 Oh Kepala Tukang 90,000.00 135.00 - 73.0000 Bh Batu Bata 900.00 - 65,700.00 44.0000 Kg Semen Ex. Tonasa 1,600.00 - 70,400.00 0.0700 M3 Pasir Pasang 235,000.00 - 16,450.00 0.0700 M3 Batu Kerikil 380,600.00 - 26,642.00 1.6000 Kg Besi Beton 10,871.00 - 17,393.60 0.0600 M3 Pasir Beton 312,500.00 - 18,750.00 Jumlah 274,695.00 215,335.60

4 Memasang Bak Kontrol Pasangan Batu Bata Bh XIII.4. Ukuran (45 x 45) cm Tinggi 50 cm 1.4200 Oh Pekerja 60,000.00 85,200.00 - 0.0710 Oh Mandor 85,000.00 6,035.00 - 0.4730 Oh Tukang Batu 80,000.00 37,840.00 - 0.0470 Oh Kepala Tukang 90,000.00 4,230.00 - 125.0000 Bh Batu Bata 900.00 - 112,500.00

Memasang Bak Mandi Teraso Volume 0,30 m3

SNI - 24

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan 77.0000 Kg Semen Ex. Tonasa 1,600.00 - 123,200.00 0.1300 M3 Pasir Pasang 235,000.00 - 30,550.00 0.0200 M3 Batu Kerikil 380,600.00 - 7,612.00 2.6000 Kg Besi Beton 10,871.00 - 28,264.60 0.0900 M3 Pasir Beton 312,500.00 - 28,125.00 Jumlah 133,305.00 330,251.60

5 Memasang Bak Kontrol Pasangan Batu Bata Bh XIII.5. Ukuran (60 x 60) cm Tinggi 60 cm 2.1600 Oh Pekerja 60,000.00 129,600.00 - 0.1080 Oh Mandor 85,000.00 9,180.00 - 0.7200 Oh Tukang Batu 80,000.00 57,600.00 - 0.1000 Oh Tukang Gali 80,000.00 8,000.00 - 0.0720 Oh Kepala Tukang 90,000.00 6,480.00 - 186.0000 Bh Batu Bata 900.00 - 167,400.00 114.0000 Kg Semen Ex. Tonasa 1,600.00 - 182,400.00 0.1840 M3 Pasir Pasang 235,000.00 - 43,240.00 0.0330 M3 Batu Kerikil 380,600.00 - 12,559.80 4.8500 Kg Besi Beton 10,871.00 - 52,724.35 0.1200 M3 Pasir Beton 312,500.00 - 37,500.00 Jumlah 210,860.00 495,824.15

6 Memasang Pipa Galvanis Diameter 1/2" M' XIII.6. 0.0540 Oh Pekerja 60,000.00 3,240.00 - 0.0900 Oh Tukang Batu 80,000.00 7,200.00 - 0.0090 Oh Kepala Tukang 90,000.00 810.00 - 0.0270 Oh Mandor 85,000.00 2,295.00 - 1.2000 M' Pipa Galvanis 63,000.00 - 75,600.00 1.0000 Ls Perlengkapan (35% Harga Pipa) 22,050.00 - 22,050.00 Jumlah 13,545.00 97,650.00

7 Memasang Pipa PVC Type AW Diameter 1/2" M' XIII.7. 0.0360 Oh Pekerja 60,000.00 2,160.00 - 0.0018 Oh Tukang Batu 85,000.00 153.00 - 0.0600 Oh Kepala Tukang 80,000.00 4,800.00 - 0.0060 Oh Mandor 90,000.00 540.00 - 1.2000 M' Pipa PVC 6,500.00 - 7,800.00 1.0000 Ls Perlengkapan (35% Harga Pipa) 2,275.00 - 2,275.00 Jumlah 7,653.00 10,075.00

8 Memasang Bak Cuci Piring Stainles Steel Bh XIII.8. 0.0300 Oh Pekerja 60,000.00 1,800.00 - 0.3000 Oh Tukang Batu 80,000.00 24,000.00 - 0.0300 Oh Kepala Tukang 90,000.00 2,700.00 - 0.0015 Oh Mandor 85,000.00 127.50 - 1.0000 Bh Bak Cuci Stainles Steel 300,000.00 - 300,000.00 1.0000 Set Water Drain + Assesories 50,000.00 - 50,000.00 Jumlah 28,627.50 350,000.00

1 Pas. dinding teakwood Tebal 3 mm M2 IX.4. 0.0700 Oh Pekerja 60,000.00 4,200.00 - 0.1000 Oh Tukang Kayu 80,000.00 8,000.00 - 0.0100 Oh Kepala Tukang 90,000.00 900.00 - 0.0035 Oh Mandor 85,000.00 297.50 - 0.3750 Lbr Teakwood Tebal 4 mm 265,650.00 - 99,618.75 0.0300 Kg Paku Triplek 24,000.00 - 720.00 Jumlah 13,397.50 100,338.75

1 Pasang Lantai keramik 40 x 40 cm M2 XI.1. 0.6200 Oh Pekerja 60,000.00 37,200.00 - 0.3500 Oh Tukang Batu 80,000.00 28,000.00 - 0.0350 Oh Kepala Tukang 90,000.00 3,150.00 - 0.0300 Oh Mandor 85,000.00 2,550.00 - 1.0000 box Keramik 40x40 79,200.00 - 79,200.00 11.3800 Kg Semen ex Tonasa 1,600.00 - 18,208.00 1.5000 Kg Semen warna 3,250.00 - 4,875.00 0.0420 M3 Pasir Pasang 235,000.00 - 9,870.00 Jumlah 70,900.00 112,153.00

1 Pasang Lantai Keramik 40 x 40 cm Kasar M2 XI.1. 0.6200 Oh Pekerja 60,000.00 37,200.00 - 0.3500 Oh Tukang Batu 80,000.00 28,000.00 - 0.0350 Oh Kepala Tukang 90,000.00 3,150.00 - 0.0300 Oh Mandor 85,000.00 2,550.00 - 1.0000 box Kearmik 40x40 Kasar 84,700.00 - 84,700.00 11.3800 Kg Semen ex Tonasa 1,600.00 - 18,208.00 1.5000 Kg Semen warna 3,250.00 - 4,875.00 0.0420 M3 Pasir Pasang 235,000.00 - 9,870.00 Jumlah 70,900.00 117,653.00

1 Bongkaran lantai keramik M2 XI.1. 0.3100 Oh Pekerja 60,000.00 18,600.00 - 0.0150 Oh Mandor 85,000.00 1,275.00 - Jumlah 19,875.00 -

SNI - 25

RINCIAN ANALISA PEKERJAAN

No Uraian Pekerjaan Sat. Kode Harga Jumlah Harga (Rp)

(Rp) Upah Bahan

Pasang Kusen Aluminium 0.3000 Oh Pekerja 60,000.00 18,000.00 - 0.6000 Oh Tukang aluminium 80,000.00 48,000.00 - 0.0600 Oh Kepala tukang 90,000.00 5,400.00 - 0.0100 Oh Mandor 85,000.00 850.00 - 1.1000 M' karet pres 5,000.00 - 5,500.00 1.1000 M' Kusen aluminium 60,000.00 - 66,000.00

Jumlah 72,250.00 71,500.00

1 Pas. dinding kaca tebal 5mm M2 IX.4. 0.0700 Oh Pekerja 60,000.00 4,200.00 - 0.1000 Oh Tukang Kaca 80,000.00 8,000.00 - 0.0100 Oh Kepala Tukang 90,000.00 900.00 - 0.0035 Oh Mandor 85,000.00 297.50 - 1.0000 m2 Kaca tebal 5mm 135,000.00 - 135,000.00 Jumlah 13,397.50 135,000.00

1 Pas. Rangka Aluminium (1.00 x 1.00) m Besi holo M2 VI.11. 0.1500 Oh Pekerja 60,000.00 9,000.00 - 0.2500 Oh Tukang Kayu 80,000.00 20,000.00 - 0.0250 Oh Kepala Tukang 90,000.00 2,250.00 - 0.0750 Oh Mandor 85,000.00 6,375.00 - 1.0000 btg Besi holo 96,000.00 - 96,000.00 0.1000 Kg Paku Anti karat 54,450.00 - 5,445.00 Jumlah 37,625.00 101,445.00

2 Pas. Dinding GRC Tebal 3 mm M2 IX.4. 0.0700 Oh Pekerja 60,000.00 4,200.00 - 0.1000 Oh Tukang Kayu 80,000.00 8,000.00 - 0.0100 Oh Kepala Tukang 90,000.00 900.00 - 0.0035 Oh Mandor 85,000.00 297.50 - 0.3750 Lbr GRC 154,000.00 - 57,750.00 0.0300 Kg Paku 54,450.00 - 1,633.50 Jumlah 13,397.50 59,383.50

1 Pasang Genteng Metal M' VIII.6. 0.2000 Oh Pekerja 60,000.00 12,000.00 - 0.1000 Oh Tukang Kayu 80,000.00 8,000.00 - 0.0100 Oh Kepala Tukang 90,000.00 900.00 - 0.0100 Oh Mandor 85,000.00 850.00 - 0.8000 Bh Genteng Metal 203,000.00 - 162,400.00 0.0300 Kg Paku Anti Karat 49,500.00 - 1,485.00 Jumlah 21,750.00 163,885.00

SNI - 26

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

7

24,000.00 16,000.00 1,800.00 1,700.00 87,500.00 4,000.00 1,562.50 3,425.40 252,000.00 900.00 6,000.00 398,887.90

24,000.00 16,000.00 1,800.00 1,700.00 87,500.00 4,000.00 120,000.00 1,562.50 3,425.40 252,000.00 900.00 27,675.00 540,562.90

18,000.00 16,000.00 1,800.00 1,700.00 70,000.00 3,200.00 2,000,000.00 1,562.50 3,425.40 900.00 2,116,587.90

6,000.00 8,000.00 900.00 425.00 66,500.00 300.00 82,125.00

60,000.00 120,000.00 13,500.00 4,250.00 210,000.00 966,000.00 10,500.00 150,000.00 1,534,250.00

6,000.00 4,250.00 10,250.00

60,000.00 160,000.00 18,000.00 4,250.00 87,500.00 651,000.00 4,500.00 150,000.00 1,135,250.00

60,000.00 4,250.00

SNI - 27

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

51,900.00 31,140.00 2,350.00 149,640.00

400,020.00 28,305.00 428,325.00

400,020.00 28,305.00 428,325.00

24,000.00 3,400.00 27,400.00

31,560.00 4,420.00 35,980.00

44,100.00 6,205.00 50,305.00

37,500.00 5,270.00 42,770.00

75,000.00 10,625.00 85,625.00

49,380.00 7,055.00 56,435.00

3,000.00 425.00 3,425.00

30,960.00 4,250.00 35,210.00

11,520.00 1,615.00 13,135.00

30,000.00 4,250.00 34,250.00

18,000.00 850.00 51,000.00 69,850.00

18,000.00 850.00 90,000.00 108,850.00

15,000.00 2,125.00 456,720.00 473,845.00

SNI - 28

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

60,000.00 8,500.00 95,150.00 11,418.00 11,750.00 186,818.00

90,000.00 48,000.00 5,400.00 6,375.00 398,750.00 627,200.00 73,790.00 1,249,515.00

90,000.00 48,000.00 5,400.00 6,375.00 398,750.00 427,200.00 100,345.00 1,076,070.00

90,000.00 48,000.00 5,400.00 6,375.00 398,750.00 374,400.00 107,160.00 1,030,085.00

90,000.00 48,000.00 5,400.00 6,375.00 398,750.00 323,200.00 113,975.00 985,700.00

90,000.00 48,000.00 5,400.00 6,375.00 398,750.00 260,800.00 122,200.00 931,525.00

90,000.00 48,000.00 5,400.00 6,375.00 398,750.00 217,600.00 127,840.00 893,965.00

90,000.00 48,000.00 5,400.00 6,375.00 398,750.00 187,200.00 131,835.00 867,560.00

90,000.00 48,000.00 5,400.00 6,375.00 398,750.00

SNI - 29

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

145,600.00 131,835.00 825,960.00

46,800.00 31,200.00 3,510.00 3,315.00 435,000.00 22,500.00 542,325.00

6,000.00 20,000.00 2,250.00 425.00 28,675.00

48,000.00 5,400.00 53,400.00

108,000.00 3,200.00 360.00 88,825.00 200,385.00

6,000.00 20,000.00 2,250.00 4,250.00 240,000.00 3,600.00 276,100.00

6,000.00 20,000.00 2,250.00 4,250.00 864,000.00 3,600.00 900,100.00

6,000.00 20,000.00 2,250.00 4,250.00 432,000.00 3,600.00 468,100.00

6,000.00 20,000.00 2,250.00 4,250.00 120,000.00 3,600.00 156,100.00

142,800.00 24,000.00 2,700.00 6,800.00 163,125.00 448,000.00 140,625.00 255,002.00 1,183,052.00

360,000.00

SNI - 30

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

160,000.00 18,000.00 27,625.00 405,000.00 202,880.00 96,350.00 1,269,855.00

360,000.00 160,000.00 18,000.00 27,625.00 405,000.00 252,160.00 89,300.00 1,312,085.00

360,000.00 160,000.00 18,000.00 27,625.00 405,000.00 329,600.00 79,900.00 1,380,125.00

21,000.00 12,000.00 1,350.00 1,445.00 111,250.00 21,600.00 11,280.00 17,550.00 197,475.00

19,200.00 9,600.00 1,080.00 1,275.00 84,062.50 16,720.00 8,930.00 17,550.00 158,417.50

19,200.00 8,000.00 900.00 1,275.00 62,500.00 12,000.00 6,345.00 17,550.00 127,770.00

18,000.00 8,000.00 900.00 1,275.00 65,450.00 20,480.00 8,225.00 122,330.00

19,200.00 8,000.00 900.00 1,275.00 45,000.00 30,320.00 8,930.00 113,625.00

19,200.00 8,000.00 900.00

SNI - 31

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

1,275.00 45,000.00 18,400.00 10,105.00 102,880.00

12,000.00 12,000.00 1,350.00 850.00 20,672.00 3,055.00 49,927.00

12,000.00 12,000.00 1,350.00 850.00 13,632.00 3,995.00 43,827.00

12,000.00 12,000.00 1,350.00 850.00 10,368.00 4,465.00 41,033.00

12,000.00 12,000.00 1,350.00 850.00 8,320.00 4,700.00 39,220.00

12,000.00 12,000.00 1,350.00 850.00 6,912.00 5,170.00 38,282.00

12,000.00 12,000.00 1,350.00 850.00 5,888.00 5,405.00 37,493.00

12,000.00 12,000.00 1,350.00 850.00 4,608.00 5,640.00 36,448.00

15,000.00 16,000.00 1,800.00 1,062.50 22,848.00 5,405.00 62,115.50

15,000.00 16,000.00 1,800.00 1,062.50 17,280.00

SNI - 32

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

6,110.00 57,252.50

15,000.00 16,000.00 1,800.00 1,062.50 13,888.00 6,580.00 54,330.50

15,000.00 16,000.00 1,800.00 1,062.50 11,664.00 6,580.00 52,106.50

15,000.00 16,000.00 1,800.00 1,062.50 9,984.00 7,050.00 50,896.50

18,000.00 16,000.00 1,800.00 1,105.00 24,800.00 3,055.00 64,760.00

18,000.00 16,000.00 1,800.00 1,105.00 18,800.00 8,225.00 63,930.00

18,000.00 16,000.00 1,800.00 1,105.00 15,168.00 8,930.00 61,003.00

19,200.00 20,000.00 2,250.00 1,275.00 29,840.00 8,225.00 80,790.00

19,200.00 20,000.00 2,250.00 1,275.00 22,640.00 9,165.00 74,530.00

19,200.00 20,000.00 2,250.00 1,275.00 18,208.00 9,870.00 70,803.00

SNI - 33

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

15,600.00 16,000.00 1,800.00 1,105.00 14,880.00 4,230.00 53,615.00

15,600.00 16,000.00 1,800.00 1,105.00 11,312.00 4,935.00 50,752.00

3,420.00 3,040.00 3,420.00 170.00 800.00 470.00 11,320.00

9,000.00 5,600.00 630.00 680.00 6,912.00 3,760.00 26,582.00

360,000.00 1,600,000.00 180,000.00 25,500.00 8,400,000.00 10,565,500.00

360,000.00 1,600,000.00 180,000.00 25,500.00 4,200,000.00 6,365,500.00

21,000.00 84,000.00 9,450.00 1,530.00 126,000.00 750.00 242,730.00

21,000.00 84,000.00 9,450.00 1,530.00 252,000.00 750.00 368,730.00

60,000.00 200,000.00 22,500.00 4,250.00 280,000.00 566,750.00

30,000.00 160,000.00 18,000.00 2,125.00 420,000.00 2,250.00

SNI - 34

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

632,375.00

240,000.00 960,000.00 108,000.00 17,000.00 7,700,000.00 12,000.00 198,000.00 9,235,000.00

240,000.00 960,000.00 108,000.00 17,000.00 3,850,000.00 12,000.00 5,187,000.00

6,000.00 8,000.00 900.00 425.00 98,000.00 2,250.00 115,575.00

7,200.00 9,600.00 1,080.00 510.00 63,000.00 3,000.00 84,390.00

9,000.00 20,000.00 2,250.00 6,375.00 42,000.00 1,500.00 81,125.00

12,000.00 24,000.00 2,700.00 850.00 80,500.00 2,250.00 122,300.00

15,000.00 28,000.00 3,150.00 1,062.50 94,500.00 3,000.00 144,712.50

6,000.00 16,000.00 2,250.00 425.00 50,400.00 750.00 75,825.00

6,600.00 17,600.00 1,980.00 425.00 77,000.00 750.00 97,755.00

SNI - 35

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

9,000.00 20,000.00 2,250.00 6,375.00 101,500.00 900.00 131,025.00

6,000.00 8,000.00 900.00 4,250.00 60,200.00 900.00 74,250.00

1,260.00 1,680.00 180.00 85.00 15,750.00 18,955.00

6,000.00 20,000.00 2,250.00 425.00 87,500.00 6,000.00 122,175.00

6,000.00 20,000.00 2,250.00 425.00 170,500.00 6,000.00 205,175.00

150,000.00 600,000.00 67,500.00 10,625.00 6,600,000.00 73,500.00 7,501,625.00

150,000.00 600,000.00 67,500.00 10,625.00 7,700,000.00 45,000.00 8,573,125.00

150,000.00 600,000.00 67,500.00 10,625.00 3,850,000.00 45,000.00 4,723,125.00

900.00 12,000.00 1,350.00 63.75 148,500.00 162,813.75

99,000.00 20,000.00

SNI - 36

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

2,250.00 6,800.00 162,500.00 331,122.00 348,800.00 970,472.00

99,000.00 20,000.00 2,250.00 6,800.00 146,875.00 357,764.00 315,200.00 947,889.00

99,000.00 20,000.00 2,250.00 6,800.00 178,125.00 331,122.00 276,800.00 914,097.00

69,000.00 1,600.00 180.00 510.00 8,125.00 16,746.40 16,000.00 112,161.40

99,000.00 20,000.00 2,250.00 6,800.00 162,500.00 296,868.00 371,200.00 958,618.00

99,000.00 20,000.00 2,250.00 6,800.00 140,625.00 342,540.00 448,000.00 1,059,215.00

99,000.00 20,000.00 2,250.00 6,800.00 175,000.00 266,420.00 563,200.00 1,132,670.00

99,000.00 20,000.00 2,250.00 6,800.00 131,250.00 205,524.00 571,200.00 1,036,024.00

99,000.00 20,000.00 2,250.00 6,800.00 146,875.00 296,868.00 617,600.00

SNI - 37

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

1,189,393.00

99,000.00 20,000.00 2,250.00 6,800.00 115,625.00 281,644.00 766,400.00 1,291,719.00

234,000.00 51,000.00 18,000.00 5,737.50 129,250.00 315,898.00 544,000.00 1,297,885.50

234,000.00 51,000.00 18,000.00 5,737.50 153,125.00 308,286.00 604,800.00 1,374,948.50

234,000.00 51,000.00 18,000.00 5,737.50 153,125.00 312,092.00 658,400.00 1,432,354.50

234,000.00 51,000.00 18,000.00 5,737.50 131,250.00 304,480.00 712,000.00 1,456,467.50

420.00 560.00 63.00 25.50 9,450.00 352.50 10,871.00

420.00 560.00 63.00 25.50 10,185.00 352.50 11,606.00

18,000.00 20,800.00 2,340.00 425.00 140,000.00 7,050.00 1,500.00 190,115.00

18,000.00 20,800.00 2,340.00 425.00

SNI - 38

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

157,500.00 7,050.00 1,500.00 207,615.00

18,000.00 26,400.00 2,970.00 510.00 192,500.00 9,400.00 35,000.00 140,000.00 3,000.00 427,780.00

19,200.00 26,400.00 2,970.00 510.00 203,000.00 9,400.00 35,000.00 140,000.00 3,000.00 439,480.00

19,200.00 26,400.00 2,970.00 510.00 192,500.00 9,400.00 35,000.00 420,000.00 320.00 706,300.00

19,200.00 26,400.00 2,970.00 510.00 157,500.00 9,400.00 35,000.00 140,000.00 320.00 391,300.00

234,000.00 28,000.00 83,200.00 84,000.00 22,050.00 14,025.00 700,000.00 35,250.00 640.00 1,350,000.00 52,875.00 516,800.00 162,500.00 296,868.00 3,580,208.00

291,000.00 28,000.00 124,800.00 112,000.00 29,790.00 14,450.00 945,000.00 47,000.00 960.00 1,800,000.00 70,500.00 516,800.00 162,500.00 296,868.00

SNI - 39

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

4,439,668.00

438,000.00 28,000.00 264,000.00 168,000.00 51,300.00 21,250.00 1,925,000.00 94,000.00 3,200.00 2,700,000.00 105,750.00 516,800.00 162,500.00 296,868.00 350,000.00 1,400,000.00 8,524,668.00

357,600.00 28,000.00 224,000.00 112,000.00 40,950.00 17,680.00 1,610,000.00 75,200.00 2,560.00 1,800,000.00 70,500.00 516,800.00 162,500.00 296,868.00 280,000.00 1,120,000.00 6,714,658.00

348,000.00 28,000.00 224,000.00 84,000.00 37,800.00 15,725.00 1,540,000.00 75,200.00 2,560.00 1,350,000.00 52,875.00 516,800.00 162,500.00 296,868.00 280,000.00 2,240,000.00 7,254,328.00

336,000.00 28,000.00 211,200.00 84,000.00 36,000.00 16,405.00 1,400,000.00 75,200.00 2,560.00 1,350,000.00 52,875.00 516,800.00 162,500.00 296,868.00 280,000.00 1,680,000.00 6,528,408.00

336,000.00 28,000.00 184,000.00 112,000.00 36,450.00 17,170.00

SNI - 40

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

1,242,500.00 70,500.00 1,920.00 1,800,000.00 70,500.00 516,800.00 162,500.00 296,868.00 250,000.00 980,000.00 6,105,208.00

3,600.00 1,600.00 1,600.00 1,600.00 540.00 255.00 7,000.00 235.00 27,000.00 10,575.00 6,400.00 1,875.00 3,425.40 65,705.40

297,520.66 132,231.40 132,231.40 132,231.40 44,628.10 21,074.38 578,512.40 19,421.49 2,231,404.96 873,966.94 528,925.62 154,958.68 283,090.91 5,430,198.35

6,000.00 2,640.00 2,640.00 2,640.00 900.00 425.00 10,500.00 470.00 32,400.00 1,175.00 8,800.00 2,812.50 5,709.00 77,111.50

400,000.00 176,000.00 176,000.00 176,000.00 60,000.00 28,333.33 700,000.00 31,333.33 2,160,000.00 78,333.33 586,666.67 187,500.00 380,600.00 5,140,766.67

8,400.00 5,600.00 630.00 595.00 43,500.00 2,880.00 61,605.00

SNI - 41

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

12,000.00 8,000.00 900.00 850.00 56,700.00 705.00 79,155.00

12,000.00 8,000.00 900.00 850.00 201,500.00 1,633.50 224,883.50

9,960.00 20,000.00 2,250.00 680.00 30,000.00 4,700.00 67,590.00

24,000.00 16,000.00 1,800.00 1,700.00 25,987.50 1,000.00 17,280.00 7,520.00 3,250.00 98,537.50

15,000.00 12,000.00 1,350.00 1,105.00 50,600.00 2,722.50 82,777.50

7,500.00 20,000.00 2,250.00 510.00 19,200.00 2,585.00 14,000.00 66,045.00

7,200.00 4,800.00 540.00 510.00 70,000.00 480.00 83,530.00

9,000.00 5,600.00 720.00 510.00 14,400.00 940.00 31,170.00

9,000.00 4,000.00 450.00 680.00 5,384.62 19,514.62

SNI - 42

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

2,666.67 300.00 12,000.00 850.00 138,000.00 6,000.00 159,816.67

2,666.67 300.00 12,000.00 850.00 215,000.00 6,000.00 236,816.67

2,666.67 300.00 12,600.00 850.00 262,000.00 278,416.67

2,666.67 300.00 12,600.00 850.00 173,000.00 189,416.67

1,600.00 180.00 7,200.00 170.00 70,000.00 6,000.00 85,150.00

8,000.00 900.00 4,200.00 297.50 21,600.00 720.00 35,717.50

4,200.00 8,000.00 900.00 297.50 27,720.00 720.00 41,837.50

4,200.00 8,000.00 900.00 297.50 22,500.00 720.00 36,617.50

4,200.00 8,000.00 900.00 297.50 28,875.00 720.00 42,992.50

SNI - 43

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

9,000.00 40,000.00 4,500.00 637.50 - - 1,500.00 3,525.00 59,162.50

3,000.00 4,000.00 450.00 255.00 16,500.00 240.00 24,445.00

18,600.00 37,600.00 4,230.00 1,317.50 - 94,500.00 1,440.00 157,687.50

4,200.00 8,000.00 900.00 297.50 28,125.00 450.00 41,972.50

8,000.00 900.00 3,600.00 255.00 3,750.00 7,000.00 84,000.00 1,390.00 41,750.00 150,645.00

3,600.00 480.00 540.00 25.50 23,210.00 4,920.00 32,775.50

39,000.00 52,000.00 5,850.00 2,720.00 800,000.00 899,570.00

63,000.00 84,000.00 9,450.00 446.25 800,000.00 956,896.25

63,000.00 120,000.00 9,450.00 442.00 960,000.00

SNI - 44

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

1,152,892.00

6,000.00 8,000.00 900.00 42.50 33,940.30 470.00 6,300.00 55,652.80

6,000.00 8,000.00 900.00 42.50 21,388.89 470.00 6,300.00 43,101.39

6,000.00 8,000.00 900.00 42.50 30,555.56 470.00 6,300.00 52,268.06

30,000.00 20,000.00 2,250.00 2,125.00 85,000.00 85,000.00 35,000.00 259,375.00

37,200.00 28,000.00 3,150.00 2,550.00 45,650.00 18,208.00 4,875.00 9,870.00 149,503.00

37,200.00 28,000.00 3,150.00 2,550.00 61,600.00 18,208.00 4,875.00 9,870.00 165,453.00

37,200.00 28,000.00 3,150.00 2,550.00 61,600.00 18,208.00 4,875.00 9,870.00 165,453.00

5,400.00 7,200.00 810.00 382.50 6,160.00 2,640.00 325.00

SNI - 45

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

752.00 23,669.50

37,200.00 28,000.00 3,150.00 2,550.00 56,100.00 67.20 4,875.00 9,870.00 141,812.20

36,000.00 36,000.00 4,050.00 2,550.00 61,600.00 14,880.00 4,875.00 4,230.00 164,185.00

36,000.00 36,000.00 4,050.00 2,550.00 57,530.00 14,880.00 4,875.00 4,230.00 160,115.00

37,200.00 28,000.00 3,150.00 2,550.00 320,000.00 19,904.00 5,875.00 416,679.00

7,200.00 9,600.00 1,080.00 510.00 75,000.00 93,390.00

7,200.00 9,600.00 1,080.00 510.00 16,800.00 1,250.00 36,440.00

25,800.00 16,000.00 3,150.00 2,550.00 22,825.00 120,000.00 18,208.00 9,870.00 218,403.00

25,800.00 16,000.00 3,150.00 2,550.00 5,525.00 240,000.00 18,208.00 9,870.00 321,103.00

SNI - 46

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

9,000.00 212.50 750.00 9,962.50

9,000.00 212.50 750.00 9,962.50

4,200.00 6,000.00 675.00 212.50 3,750.00 5,100.00 8,415.00 28,352.50

4,200.00 720.00 540.00 212.50 6,000.00 3,750.00 5,100.00 12,870.00 33,392.50

2,400.00 5,040.00 5,670.00 212.50 20,340.00 33,662.50

6,000.00 510.00 5,250.00 11,760.00

9,600.00 12,800.00 1,440.00 212.50 8,475.00 1,300.00 500.00 120.00 34,447.50

1,200.00 5,040.00 567.00 212.50 2,500.00 1,540.00 20,800.00 31,859.50

1,680.00 3,360.00 378.00 212.50 1,680.00 14,400.00 21,710.50

SNI - 47

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

1,200.00 16,000.00 1,800.00 850.00 6,150.00 120.00 26,120.00

360.00 4,800.00 1,080.00 510.00 31,500.00 38,250.00

30,000.00 64,000.00 27,000.00 17,000.00 1,540.00 5,610.00 8,400.00 153,550.00

24,000.00 56,000.00 18,000.00 17,000.00 4,200.00 119,200.00

126,000.00 9,350.00 60,000.00 6,300.00 296,000.00 9,600.00 2,350.00 509,600.00

360,000.00 25,500.00 240,000.00 27,000.00 180,000.00 192,000.00 70,500.00 443,520.00 19,500.00 1,558,020.00

192,000.00 1,360.00 81,200.00 135.00 65,700.00 70,400.00 16,450.00 26,642.00 17,393.60 18,750.00 490,030.60

85,200.00 6,035.00 37,840.00 4,230.00 112,500.00

SNI - 48

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

123,200.00 30,550.00 7,612.00 28,264.60 28,125.00 463,556.60

129,600.00 9,180.00 57,600.00 8,000.00 6,480.00 167,400.00 182,400.00 43,240.00 12,559.80 52,724.35 37,500.00 706,684.15

3,240.00 7,200.00 810.00 2,295.00 75,600.00 22,050.00 111,195.00

2,160.00 153.00 4,800.00 540.00 7,800.00 2,275.00 17,728.00

1,800.00 24,000.00 2,700.00 127.50 300,000.00 50,000.00 378,627.50

4,200.00 8,000.00 900.00 297.50 99,618.75 720.00 113,736.25

37,200.00 28,000.00 3,150.00 2,550.00 79,200.00 18,208.00 4,875.00 9,870.00 183,053.00

37,200.00 28,000.00 3,150.00 2,550.00 84,700.00 18,208.00 4,875.00 9,870.00 188,553.00

18,600.00 1,275.00 19,875.00

SNI - 49

RINCIAN ANALISA PEKERJAAN

Jumlah Harga (Rp) Jumlah

18,000.00 48,000.00 5,400.00 850.00 5,500.00 66,000.00 143,750.00

4,200.00 8,000.00 900.00 297.50 135,000.00 148,397.50

9,000.00 20,000.00 2,250.00 6,375.00 96,000.00 5,445.00 139,070.00

4,200.00 8,000.00 900.00 297.50 57,750.00 1,633.50 72,781.00

12,000.00 8,000.00 900.00 850.00 162,400.00 1,485.00 185,635.00

4.14 RENCANA ANGGARAN BIAYA

PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI DIJALAN MARSMA R ISWAHYUDI BALIKPAPANTAHUN : 2012

No. Uraian Pekerjaan Volume Sat.

Harga Jumlah

Satuan Harga

( Rp) ( Rp)

1 2 3 4 5 6

I PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi pekerjaan 367.50 m² 10,250.00 3,766,875.00

2 Membuat Gudang Kerja 12.00 1,135,250.00 13,623,000.00

3 Penyediaan Air Kerja 1.00 ls 1,000,000.00 1,000,000.00

4 Penyediaan Listrik 1.00 ls 1,000,000.00 1,000,000.00

5 Pengukuran dan pemasangan bouplank 53.00 m' 82,125.00 4,352,625.00

SUB TOTAL 23,742,500.00

II PEKERJAAN TANAH GALIAN/ URUGAN PASIR DAN PASANGAN

1 Galian pondasi foot plat 42.63 m³ 27,400.00 1,168,062.00

2 Menguruk kembali bekas galian pondasi 32.55 m³ 13,135.00 427,544.25

3 Urugan pasir bawah pondasi 1.47 m³ 108,850.00 160,009.50

4 Pekerjaan pancang ulin 10 x 10 - 4 m 75.00 titik 276,100.00 20,707,500.00

5 Urugan tanah menambah elevasi lantai 14.2 m³ 69,850.00 991,870.00

SUB TOTAL 23,454,985.75

III PEKERJAAN BETON

1 Pondasi footplat Beton K225 18.75 m³ 1,374,948.50 25,780,284.38

2 Cor Sloof 25/40 Beton K225 6.60 m³ 1,374,948.50 9,074,660.10

3 Cor Sloof 16/16 Beton K225 0.14 m³ 1,374,948.50 192,492.79

4 Kolom 25/25 lantai 1 Beton K225 3.07 m³ 1,374,948.50 4,221,091.90

PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI DIJALAN MARSMA R ISWAHYUDI BALIKPAPANTAHUN : 2012

No. Uraian Pekerjaan Volume Sat.

Harga Jumlah

Satuan Harga

( Rp) ( Rp)

5 Kolom 25/25 lantai 2 Beton K225 2.53 m³ 1,374,948.50 3,478,619.70

6 Kolom 25/25 lantai 3 Beton K225 1.52 m³ 1,374,948.50 2,089,921.72

7 Kolom 15/25 lantai 2 Beton K225 0.20 m³ 1,374,948.50 274,989.70

8 Kolom 15/25 lantai 3 Beton K225 0.25 m³ 1,374,948.50 343,737.13

9 Kolom 15/15 lantai 1 Beton K225 0.52 m³ 1,374,948.50 714,973.22

10 Kolom 15/15 lantai 2 Beton K225 0.73 m³ 1,374,948.50 1,003,712.41

11 Kolom 15/15 lantai 3 Beton K225 0.36 m³ 1,374,948.50 494,981.46

12 Balok 25/30 lantai 2 Beton K225 4.95 m³ 1,374,948.50 6,805,995.08

13 Balok 25/30 lantai 3 Beton K225 4.95 m³ 1,374,948.50 6,805,995.08

14 Balok 25/30 atap dag Beton K225 3.38 m³ 1,374,948.50 4,647,325.93

15 Balok 20/20 lantai 2 Beton K225 1.38 m³ 1,374,948.50 1,897,428.93

16 Balok 20/20 lantai 3 Beton K225 0.68 m³ 1,374,948.50 934,964.98

17 Balok 20/20 atap dag Beton K225 0.28 m³ 1,374,948.50 384,985.58

18 Tangga Beton lt 1 ke lt 2 Beton K225 3.22 m³ 1,374,948.50 4,427,334.17

19 Tangga Beton lt 2 ke lt 3 Beton K225 2.85 m³ 1,374,948.50 3,918,603.23

20 Balok bordes 20/30 Beton K225 1.04 m³ 1,374,948.50 1,429,946.44

21 Rabat beton Beton 1:3:5 11.24 m³ 970,472.00 10,908,105.28

22 Plat lantai 2 Beton K225 9.73 m³ 1,374,948.50 13,378,248.91

23 Plat lantai 3 Beton K225 10.13 m³ 970,472.00 9,830,881.36

24 Plat atap dag Beton K225 5.16 m³ 1,374,948.50 7,094,734.26

25 Beton duc bawah kusen Beton 1:3:5 0.012 m³ 970,472.00 11,645.66

PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI DIJALAN MARSMA R ISWAHYUDI BALIKPAPANTAHUN : 2012

No. Uraian Pekerjaan Volume Sat.

Harga Jumlah

Satuan Harga

( Rp) ( Rp)

26 Balok latei atas kusen Beton K225 0.01 m³ 1,374,948.50 13,749.49

27 Konsol kantiliver Beton 1:3:5 0.05 m³ 970,472.00 48,523.60

SUB TOTAL 120,207,932.45

IV PEKERJAAN PEMBESIAN

1 Pek. Pembesian Balok Sloof 25/40 1,659.68 kg 11,606.00 19,262,213.40

2 Pek. Pembesian Balok Sloof 16/16 27.76 kg 11,606.00 322,145.45

3 Pek. Pembesian kolom 25/25 2,744.39 kg 11,606.00 31,851,375.40

4 Pek. Pembesian kolom 15/25 200.57 kg 11,606.00 2,327,791.25

5 Pek. Pembesian kolom 15/15 358.44 kg 11,606.00 4,160,077.59

6 Pek. Pembesian balok 25/30 6,000.57 kg 11,606.00 69,642,596.30

7 Pek. Pembesian balok 20/20 1,069.60 kg 11,606.00 12,413,833.46

8 Pek. Pembesian balok 12/12 balok latei 7.34 kg 10,871.00 79,753.46

9 Pek. Pembesian plat lantai 2 1,274.61 kg 10,871.00 13,856,326.08

10 Pek. Pembesian plat lantai 3 1,362.56 kg 10,871.00 14,812,362.31

11 Pek. Pembesian plat atap dag 780.74 kg 10,871.00 8,487,376.71

12 Pek. Pembesian plat bordes 294.30 kg 11,606.00 3,415,672.54

13 Pek. Pembesian tangga 897.95 kg 10,871.00 9,761,587.70

14 Pek. Pembesian begel sloof 25/40 dan 16/16 382.23 kg 10,871.00 4,155,222.33

15 Pek. Pembesian begel kolom 25/25 dan 15/15 557.23 kg 10,871.00 6,057,688.64

16 Pek. Pembesian begel kolom 25/15 43.28 kg 10,871.00 470,478.40

17 Pek. Pembesian begel balok bordes 57.70 kg 10,871.00 627,304.53

18 Pek. Pembesian pondasi foot plat 516.79 kg 11,606.00 5,997,904.84

PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI DIJALAN MARSMA R ISWAHYUDI BALIKPAPANTAHUN : 2012

No. Uraian Pekerjaan Volume Sat.

Harga Jumlah

Satuan Harga

( Rp) ( Rp)

19 Pagar balkon dan pagar lantai 2 24.88 m² 955,000.00 23,760,400.00

20 Pekerjaan Railing Tangga 21.70 m² 955,000.00 20,723,500.00

SUB TOTAL 252,185,610.39

V PEKERJAAN BEKISTING

1 Pek. Pemasangan bekisting Foot plat 22.32 m² 190,115.00 4,243,366.80

2 Pek. Pemasangan bekisting Sloof 25/40 52.80 m² 207,615.00 10,962,072.00

3 Pek. Pemasangan bekisting Sloof 16/16 1.79 m² 207,615.00 371,630.85

4 Pek. Pemasangan bekisting Kolom 25/25 lantai 1 49.05 m² 427,780.00 20,982,609.00

5 Pek. Pemasangan bekisting Kolom 25/25 lantai 2 40.50 m² 427,780.00 17,325,090.00

6 Pek. Pemasangan bekisting Kolom 25/25 lantai 3 24.30 m² 427,780.00 10,395,054.00

7 Pek. Pemasangan bekisting Kolom 15/25 lantai 2 4.32 m² 427,780.00 1,848,009.60

8 Pek. Pemasangan bekisting Kolom 15/25 lantai 3 10.80 m² 427,780.00 4,620,024.00

9 Pek. Pemasangan bekisting Kolom 15/15 lantai 1 13.73 m² 427,780.00 5,873,419.40

10 Pek. Pemasangan bekisting Kolom 15/15 lantai 2 23.55 m² 427,780.00 10,074,219.00

11 Pek. Pemasangan bekisting Kolom 15/15 lantai 3 11.78 m² 427,780.00 5,039,248.40

12 Pek. Pemasangan bekisting Kolom 25/25 diatas Foot plat 9.15 m² 427,780.00 3,914,187.00

13 Pek. Pemasangan bekisting Balok 25/30 lantai 2 50.82 m² 439,480.00 22,334,373.60

14 Pek. Pemasangan bekisting Balok 25/30 lantai 3 50.82 m² 439,480.00 22,334,373.60

15 Pek. Pemasangan bekisting Balok 25/30 atap dag 34.65 m² 439,480.00 15,227,982.00

16 Pek. Pemasangan bekisting Balok 20/20 lantai 2 13.81 m² 439,480.00 6,069,218.80

17 Pek. Pemasangan bekisting Balok 20/20 lantai 3 6.80 m² 439,480.00 2,988,464.00

PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI DIJALAN MARSMA R ISWAHYUDI BALIKPAPANTAHUN : 2012

No. Uraian Pekerjaan Volume Sat.

Harga Jumlah

Satuan Harga

( Rp) ( Rp)

18 Pek. Pemasangan bekisting Balok 20/20 atap dag 2.80 m² 439,480.00 1,230,544.00

19 Pek. Pemasangan bekisting Tangga dari lt.1 ke lt.2 31.64 m² 391,300.00 12,380,732.00

20 Pek. Pemasangan bekisting Tangga dari lt.2 ke lt.3 25.36 m² 391,300.00 9,923,368.00

21 Pek. Pemasangan bekisting Balok Bordes 20/30 9.46 m² 439,480.00 4,157,480.80

22 Pek. Pemasangan bekisting Balok latei 12/12 0.17 m² 439,480.00 74,711.60

23 Pek. Pemasangan bekisting Konsol Kantiliver 0.70 m² 439,480.00 307,636.00

24 Pek. Pemasangan bekisting Plat lantai 2 81.05 m² 706,300.00 57,245,615.00

25 Pek. Pemasangan bekisting Plat lantai 3 84.32 m² 706,300.00 59,555,216.00

26 Pek. Pemasangan bekisting Plat atap dag 51.51 m² 706,300.00 36,381,513.00

SUB TOTAL 345,860,158.45

VI PEKERJAAN DINDING

1 Pek. Pasangan bata 1 : 2 dinding kamar mandi lantai 1 0.46 1,380,125.00 636,237.63

2 Pek. Pasangan bata 1 : 2 dinding kamar mandi lantai 2 dan 3.95 1,380,125.00 5,457,014.25

3 Pek. Pasangan bata 1 : 4 lantai 1 14.03 1,269,855.00 17,817,335.51

4 Pek. Pasangan bata 1 : 4 lantai 2 15.38 1,269,855.00 19,530,369.90

5 Pek. Pasangan bata 1 : 4 lantai 3 11.00 1,269,855.00 13,972,214.57

6 Pek. Pasangan bata 1:4 balkon lt 2 dan pagar lt 3 1.00 1,269,855.00 1,268,585.15

7 Pek. Plesteran 1 : 2 88.30 43,827.00 3,869,924.10

8 Pek. Plesteran 1 : 4 lantai 1 280.62 39,220.00 11,005,916.40

9 Pek. Plesteran 1 : 4 lantai 2 307.60 m² 39,220.00 12,064,072.00

10 Pek. Plesteran 1 : 4 lantai 3 307.60 m² 39,220.00 12,064,072.00

SUB TOTAL 97,685,741.49

m³m³m³m³m³m³m³m²

PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI DIJALAN MARSMA R ISWAHYUDI BALIKPAPANTAHUN : 2012

No. Uraian Pekerjaan Volume Sat.

Harga Jumlah

Satuan Harga

( Rp) ( Rp)

VII PEKERJAAN LANTAI

1 Pemasangan Keramik 40 x 40 lantai 1 87.50 m² 183,053.00 16,017,137.50

2 Pemasangan Keramik 30/30 teras 7.00 m² 183,053.00 1,281,371.00

3 Pas.Keramik 20 x 20 kamar mandi lantai 1 7.00 m² 165,453.00 1,158,171.00

4 Pas. Keramik dinding kamar mandi 20 x 30 lantai 1 20.45 m² 165,453.00 3,383,513.85

5 Pemasangan Keramik 40 x 40 lantai 2 91.50 m² 183,053.00 16,749,349.50

6 Pemasangan Keramik 30 x 30 balkon lantai 2 3.20 m² 183,053.00 585,769.60

7 Pas.Keramik 20 x 20 kamar mandi lantai 2 3.00 m² 165,453.00 496,359.00

8 Pas. Keramik dinding kamar mandi 20 x 30 lantai 2 14.02 m² 165,453.00 2,319,651.06

9 Pemasangan Keramik 40 x 40 lantai 3 39.00 m² 183,053.00 7,139,067.00

10 Pas.Keramik 20 x 20 kamar mandi lantai 3 3.00 m² 165,453.00 496,359.00

11 Pas. Keramik dinding kamar mandi 20 x 30 lantai 3 14.20 m² 165,453.00 2,349,432.60

12 Pemasangan Keramik 25 x 25 tangga lantai 1 ke lantai 2 16.30 m² 183,053.00 2,983,763.90

13 Pemasangan Keramik 25 x 25 tangga lantai 2 ke lantai 3 15.80 m² 183,053.00 2,892,237.40

SUB TOTAL 57,852,182.41

VIII PEKERJAAN LANGIT-LANGIT / PLAFOND

1 Pas. Rangka plafond 273.15 m² 157,687.50 43,072,340.63

2 Plafond Gypsum 273.15 m² 157,687.50 43,072,340.63

SUB TOTAL 86,144,681.25

IX PEK. KUSEN, DAUN PINTU DAN JENDELA

1 Kusen pintu kayu bangkirai 0.43 m³ 10,565,500.00 4,522,034.00

2 Kusen jendela kayu bangkirai 0.09 m³ 10,565,500.00 898,067.50

PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI DIJALAN MARSMA R ISWAHYUDI BALIKPAPANTAHUN : 2012

No. Uraian Pekerjaan Volume Sat.

Harga Jumlah

Satuan Harga

( Rp) ( Rp)

3 Daun pintu panel kayu bangkirai 18.48 m² 566,750.00 10,473,540.00

4 Rangka ventilasi kayu bengkirai 0.07 m³ 10,565,500.00 729,019.50

5 Rangka roster kayu bengkirai 0.09 m³ 10,565,500.00 950,895.00

6 Daun jendela kaca rangka kayu bangkirai 6.51 m² 566,750.00 3,689,542.50

7 Pintu harmonika 15.80 700,000.00 11,060,000.00

8 Pasangan kaca mati bening 5 mm 1.60 m² 162,813.75 260,502.00

SUB TOTAL 32,583,600.50

X PEKERJAAN INSTALASI LISTRIK

1 Pasang instalasi titik lampu 50 ttk 109,146.00 5,457,300.00

2 Pasang instalasi stop kontak 15 ttk 109,146.00 1,637,190.00

3 Pasang box MCB 2 unit 188,900.00 377,800.00

4 Saklar tunggal setara Broco 6 bh 25,000.00 150,000.00

5 Saklar ganda setara Broco 10 bh 25,000.00 250,000.00

6 Stop kontak setara Broco 15 bh 25,300.00 379,500.00

7 Box Panel 300 x 400 x 200 mm/Legrand + Accessories 2 bh 173,000.00 346,000.00

8 Lampu Jari (TL) 15 Watt Phillips 25 bh 24,500.00 612,500.00

9 Lampu Neon (TL) 30 Watt Phillips 25 bh 95,000.00 2,375,000.00

SUB TOTAL 11,585,290.00

XI PEKERJAAN SANITAIR DAN INSTALASI AIR

1 Instalasi Pipa 4" 17.75 m' 27,550.00 489,012.50

2 Instalasi Pipa 3" 39.16 m' 24,500.00 959,420.00

3 Instalasi Pipa 1/2" 44.90 m' 17,728.00 795,987.20

PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI DIJALAN MARSMA R ISWAHYUDI BALIKPAPANTAHUN : 2012

No. Uraian Pekerjaan Volume Sat.

Harga Jumlah

Satuan Harga

( Rp) ( Rp)

4 Bak Kontrol 1.00 bh 463,556.60 463,556.60

5 Kran 9.00 bh 235,000.00 2,115,000.00

6 Floor Drain 4.00 bh 12,000.00 48,000.00

7 Pasang Closed Jongkok 4.00 bh 150,000.00 600,000.00

8 kitchen zink 1.00 Unit 320,000.00 320,000.00

9 Biofil 2 x 1 x 1,5 1.00 Unit 13,600,000.00 13,600,000.00

SUB TOTAL 19,390,976.30

XII PEKERJAAN PENGECATAN

1 Cat dinding Lantai 1 561.24 m² 31,859.50 17,880,825.78

2 Cat dinding Lantai 2 615.20 m² 31,859.50 19,599,964.40

3 Cat dinding Lantai 3 22.01 m² 31,859.50 701,100.16

4 Cat plafond 273.15 m² 31,859.50 8,702,422.42

5 Cat kusen pintu KPJ1 dengan cat minyak 12.42 m² 33,392.50 414,734.85

6 Cat kusen pintu KP1 dengan cat minyak 13.25 m² 33,392.50 442,450.63

7 Cat kusen pintu KP2 dengan cat minyak 22.21 m² 33,392.50 741,647.43

8 Cat kusen pintu KJ1 dengan cat minyak 5.12 m² 33,392.50 170,969.60

9 Cat Ranga V1 dengan cat minyak 1.08 m² 33,392.50 36,063.90

10 Cat Ranga V2 dengan cat minyak 0.91 m² 33,392.50 30,387.18

11 Cat Ranga R1 dengan cat minyak 1.05 m² 33,392.50 35,062.13

12 Cat Ranga R2 dengan cat minyak 1.17 m² 33,392.50 39,069.23

SUB TOTAL 48,794,697.69

XIII PEKERJAAN PENGGANTUNG DAN PENGUNCI

PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI DIJALAN MARSMA R ISWAHYUDI BALIKPAPANTAHUN : 2012

No. Uraian Pekerjaan Volume Sat.

Harga Jumlah

Satuan Harga

( Rp) ( Rp)

1 Pasang kunci pintu utama 2 set 187,000.00 374,000.00

2 Pasang kunci pintu 8 set 98,000.00 784,000.00

3 Pas. Engsel pintu 4" 68 bh 42,000.00 2,856,000.00

4 Pas. Grendel pintu (panjang) 2 bh 9,500.00 19,000.00

5 Pas. Grendel jendela 7 bh 6,500.00 45,500.00

6 Pas Grendel pintu (kecil) 8 bh 6,500.00 52,000.00

7 Pas. Engsel jendela 12 bh 36,000.00 432,000.00

8 Hak Angin standard 14 bh 14,000.00 196,000.00

9 Pas. Handel Jendela 7 bh 7,000.00 49,000.00

SUB TOTAL 4,807,500.00

XIV PEKERJAAN LAIN-LAIN

1 Pembersihan lokasi pekerjaan 1.00 Ls 1,000,000.00 1,000,000.00

2 Quality Control 1.00 Ls 1,000,000.00 1,000,000.00

SUB TOTAL 2,000,000.00

TOTAL 1,126,295,856.69

PENJADWALAN RUKO 3 LANTAI

NO URAIAN PEKERJAAN

I PEKERJAAN PENDAHULUAN

II

PEKERJAAN TANAH GALIAN/ URUGAN PASIR DAN PASANGANIII PEKERJAAN BETON

IV PEKERJAAN PEMBESIAN

V PEKERJAAN BEKISTING

VI PEKERJAAN DINDING

VII PEKERJAAN LANTAI

VIII PEKERJAAN LANGIT-LANGIT / PLAFOND

IX PEK. KUSEN, DAUN PINTU DAN JENDELA

X PEKERJAAN INSTALASI LISTRIK

XI PEKERJAAN SANITAIR DAN INSTALASI AIR

XII PEKERJAAN PENGECATAN

XIII PEKERJAAN PENGGANTUNG DAN PENGUNCI

X1V PEKERJAAN LAIN-LAIN

PENJADWALAN RUKO 3 LANTAI

HARGA HARI

BULAN 1

MINGGU

1 2

2.1 23,742,500.0 9 1.37 0.68

2.1 23,454,985.8 6 1.48

10.7 120,207,932.5 20

22.4 252,185,610.4 28

30.7 345,860,158.5 50

8.67 97,685,741.49 79

5.14 57,852,182.41 35

7.65 86,144,681.25 47

2.89 19,390,976.30 12

1.03 11,585,290.00 6

1.72 19,390,976.30 6

4.33 4,807,500.00 14

0.43 4,807,500.00 3

0.18 2,000,000.00 5

100.00 JUMLAH BOBOT 0 1.4 2.16KOMULATIF BOBOT 0 1.4 3.53

BOBOT PEKERJAAN

(%)

PENJADWALAN RUKO 3 LANTAI

BULAN 1 BULAN 2 BULAN 3

MINGGU MINGGU MINGGU

3 4 5 6 7 8 9 10

0.74

0.54 1.08 1.08 1.08 1.08 1.08 1.08 1.08

1.6 2.4 3.2 3.16 2.37 3.16 3.16 2.37

2.5 3.7 3.7 3.7 3.7 3.7 3.7 3.7

0.7 0.5 0.7 0.5 0.6

0.30 0.30 0.30 0.59 0.44 0.30

4.58 7.88 8.22 8.88 7.98 9.18 8.92 8.078.11 15.98 24.20 33.08 41.06 50.24 59.16 67.22

PENJADWALAN RUKO 3 LANTAI

BULAN 3 BULAN 4 BULAN 5

MINGGU MINGGU MINGGU

11 12 13 14 15 16 17

1.08 1.62

0.79

2.5

0.5 0.7 0.5 0.5 0.7 0.7 0.7

0.59 0.59 0.30 0.59 0.89

0.6 1.0 1.0 1.0 0.74 1.0

0.74 0.74 0.74 0.74

0.34 0.34

0.57 0.86 0.29

1.5

0.14 0.14

0.036 0.11

5.47 4.60 1.96 3.43 4.16 2.40 3.8072.69 77.29 79.25 82.68 86.84 89.23 93.03

PENJADWALAN RUKO 3 LANTAI

BULAN 5

MINGGU

18 19 20 21

100

90

80

70

0.7 0.1

60

1.0 1.0 1.0

50

0.34 40

30

1.2 0.31 0.6 0.6

0.14 20

0.04 10

0

3.20 1.42 1.58 0.7696.23 97.65 99.24 100.00

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

HARGA BAHAN BANGUNAN

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

X.3.1. Batu

X.3.1.1. Bahan Struktur

1. Abu Batu/Palu 385,000.00

. Base Course (LPA) 450,000.00

1. Batu Quarry/Batu 362,500.00

Gunung

2. Batu Pecah 10 - 15 cm 346,000.00

3. Batu Pecah 5 - 7 cm 346,000.00

4. Batu Pecah 3 - 5 cm 346,000.00

5. Batu Pecah 2 - 3 cm 346,000.00

6. Batu Pecah 1 - 2 cm 346,000.00

7. Batu Pecah 0.5 - 1.0 cm (Chipping) 346,000.00

8. Batu Abu Filler/Kapur 385,000.00

9. Kerikil Sungai 380,600.00

10. Sirtu Royalti 380,600.00

11. Sub Base Course (LPB) 346,000.00

Agregat Kasar 346,000.00

Agregat Halus 361,000.00

X.3.1.2. Bahan Pasangan

1. Batu Bata cUk. 10 x 10 x 20 cm Bh 900.00 2. Loster Perancis Uk. 10 x 20 x 25 cm Bh 74,500.00 3. Loster Bulan berkait Uk. 20 x 20 x 10 cm Bh 3,500.00 4. Loster Bintang wajik Uk. 10 x 20 x 30 cm Bh 3,500.00 5. Loster Bunga wajik Uk. 20 x 20 x 10 cm Bh 3,500.00 6. Loster Matahari Uk. 20 x 20 x 10 cm Bh 16,000.00 7. Bataco Pasir Samboja Type I Uk. 20 x 20 x 40 cm Bh 8,900.00 8. Bataco Pasir Samboja Type I Uk. 15 x 20 x 40 cm Bh 6,725.00 9. Bataco Pasir Samboja Type I Uk. 12 x 20 x 40 cm Bh 6,200.00 10. Bataco Pasir Samboja Type II Uk. 10 x 20 x 40 cm Bh 5,000.00 11. Cable Tile Cable Tile Type I Uk. 20 x 20 x 40 cm Bh 4,620.00 12. Cable Tile Cable Tile Type I Uk. 30 x 30 x 0.5 cm Bh 6,385.00 13. Bata Semen Bata Semen Type I Uk. 10 x 10 x 20 cm Bh14. Bata Semen Bata Semen Type II Uk. 9 x 14 x 30 cm Bh15. Loster Loster Perancis Uk. 10 x 20 x 25 cm Bh 4,400.00 16. Loster Loster Bulan Berkait Uk. 20 x 20 x 10 cm Bh 3,850.00 17. Loster Loster Bintang Wajik Uk. 10 x 20 x 30 cm Bh 3,850.00 18. Loster Loster Bunga Wajik Uk. 20 x 20 x 10 cm Bh 3,850.00 19. Loster Loster Matahari Uk. 20 x 20 x 10 cm Bh 3,850.00 20. Batu alam Batu Candi M2 320,000.00 21. Batu alam Batu Marmo M2 140,000.00 22. Batu alam Batu Palimanan M2 140,000.00 23. Batu alam Batu Ardiret M2 320,000.00 24. Batu alam Batu Lempengan Biasa M2 76,800.00 25. Batu alam Batu Lempengan Merah M2 140,000.00 26. Glass Block Uk. 30 x 30 cm Bh 23,650.00

X.3.2. Pasir

1. Pasir Beton ex Palu 312,500.00

2. Pasir Urug 75,000.00

3. Pasir Putih/Pasangan 235,000.00

X.3.3. Tanah

1. Tanah Urug 42,500.00

1 Tanah Urug Pilihan 80,000.00

X.3.4. Semen

1. Semen Abu-abu 1 zak = 50 kg Zak 80,000.00 2. Semen Abu-abu 1 zak = 50 kg Zak 65,000.00 3. Semen Abu-abu 1 zak = 50 kg Zak 60,000.00

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

4. Semen Abu-abu 1 zak = 50 kg Zak 57,500.00 5. Semen Abu-abu 1 zak = 50 kg Zak 60,000.00 2 Semen Putih 1 zak = 20 kg Zak 65,000.00

Semen Putih 1 zak = 40 kg Zak 140,000.00 X.3.5. Kayu

1. Kayu Ulin Ukuran 12 x 12 x 400 cm 7,500,000.00

2. Kayu Ulin Ukuran 10 x 10 x 400 cm 6,000,000.00

3. Kayu Ulin Ukuran 5 x 10 x 400 cm 6,000,000.00

Kayu Ulin Ukuran 5 x 7 x 400 cm 4,500,000.00

4. Papan Ulin Ukuran 2 x 20 x 400 cm 5,500,000.00

Papan Ulin Ukuran 2 x 20 x 200 cm 3,500,000.00

1 Kayu Meranti Ukuran 6 x 12 x 400 cm 3,500,000.00

Kayu Meranti Ukuran 7 x 10 x 400 cm 2,500,000.00

6. Papan Meranti Ukuran 2.5 x 20 x 400 cm 3,500,000.00

Papan Meranti Ukuran 2 x 20 x 400 cm 5,500,000.00

7. Kayu Meranti Ukuran 5 x 7 x 400 cm 5,000,000.00

Kayu Meranti Ukuran 5 x 5 x 400 cm 2,500,000.00

8. Kayu Bangkirai Ukuran 6 x 12 x 400 cm 7,000,000.00

Kayu Bangkirai Ukuran 10 x 10 x 400 cm 5,100,000.00

9. Papan Bangkirai Ukuran 2 x 20 x 400 cm 6,050,000.00

Papan Bangkirai Ukuran 4 x 20 x 200 cm 5,700,000.00

10. Kayu List Profil Panjang 400 cm Btg 60,000.00 11. Dolken K.Galam Diameter 8 panjang 400 cm Btg 70,000.00 12. Papan Sungkai Ukuran 2 x 8 x 400 cm Btg 32,000.00

X.3.6. Besi

X.3.6.1. Besi Nako

1. Besi Nako Panjang 27 cm Btg 14,500.00 2. Besi Nako Panjang 66 cm Btg 18,500.00 3. Besi Nako Panjang 65 cm Btg 17,500.00 4. Besi Nako Panjang 53 cm Btg 15,500.00 5. Besi Nako Panjang 24 cm Btg 11,000.00 6. Besi Nako Panjang 60 cm Btg 15,000.00

X.3.6.2. Kawat

1. Kawat Wiremesh Panjang 8 m x 2.25 m x 5.5 m Roll 779,900.00 2. Kawat Las Panjang 2.6 m RB 26 @ 5 Kg Dos 111,000.00 3. Kawat Las Panjang 3.2 m RB 26 @ 5 Kg Dos 134,500.00 4. Kawat Las Panjang 4 m RB 26 @ 5 Kg Dos 165,300.00 5. Kawat Bendrat Bendrat Kg 23,500.00 6. Kawat Wiremesh Panjang 6 m x 2.25 m x 60 m Roll 4,165,400.00

M67. Kawat Nyamuk Lebar 90 cm M' 17,500.00 8. Kawat Kasa Lebar 90 cm M' 25,000.00 9. Kawat Duri Kg 80,000.00

X.3.6.3. Besi Beton

X.3.6.3.1. Besi Beton Polos (Full)

1. Besi Beton ø 6 ( 5,0) x 11,0 m berat 0,22 kg/m' Btg 27,500.00 2. Besi Beton ø 8 ( 6,2) x 11,0 m berat 0,393 kg/m' Btg 32,500.00 3. Besi Beton ø 8 ( 7,0) x 11,4 m berat 0,393 kg/m' Btg 37,500.00 4. Besi Beton ø 8 ( 7,4) x 11,4 m berat 0,393 kg/m' Btg 85,000.00 5. Besi Beton ø 8 ( 7,8) x 11,4 m berat 0,393 kg/m' Btg 40,000.00 6. Besi Beton ø 10 ( 8,3) x 11,4 m berat 0,62 kg/m' Btg 57,500.00 7. Besi Beton ø 10 ( 9,4) x 11,4 m berat 0,62 kg/m' Btg 85,000.00 8. Besi Beton ø 12 (11,4) x 11,4 m berat 0,887 kg/m' Btg 80,000.00 9. Besi Beton ø 14 (12,0) x 11,4 m berat 1, 209 kg/m' Btg 133,000.00 10. Besi Beton ø 14 (12,8) x 11,4 m berat 1, 209 kg/m' Btg 125,000.00 11. Besi Beton ø 16 (13,8) x 11,4 m berat 1, 58 kg/m' Btg 155,000.00 12. Besi Beton ø 16 (15,0) x 12,0 m berat 1, 58 kg/m' Btg 245,000.00 13. Besi Beton ø 19 (18,6) x 12,0 m berat 2, 23 kg/m' Btg 195,000.00 14. Besi Beton ø 22 Btg 227,000.00 15. Besi Beton ø 25 Btg 405,000.00 16. Besi Beton ø 32 Btg 640,000.00

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

1 Besi Beton Kg 9,000.00 18. Besi Strip Kg 18,000.00

X.3.6.3.2. Besi Beton Polos (Banci)

1. Besi Beton ø 8 ( 5,2) x 7,5 m Btg 21,500.00 2. Besi Beton ø 10 ( 6,2) x 7,0 m Btg 26,500.00 3. Besi Beton ø 12 ( 8,0) x 7,0 m Btg 37,500.00

X.3.6.3.3. Besi Beton Ulir

1. Besi Beton ø 10 x 12,0 m berat 0,56 kg/m' Btg 66,500.00 2. Besi Beton ø 16 x 12,0 m berat 1,56 kg/m' Btg 166,500.00 3. Besi Beton ø 19 x 12,0 m berat 2,25 kg/m' Btg 227,000.00 4. Besi Beton ø 25 x 12,0 m berat 3,98 kg/m' Btg 400,000.00 1 Besi Beton Kg 9,700.00

X.3.6.4. Baut & Mur

1. Baut Dan Mur ø 10 mm Psg 5,000.00 2. Baut Dan Klam Psg 10,500.00 3. Baut ø 12 mm Kg 35,000.00 4. Baut ø 16 mm Kg 35,000.00 5. Baut ø 10 mm Kg 35,000.00

X.3.6.5. Paku

1. Paku Triplek Kg 24,000.00 2. Paku Payung Kg 24,000.00 3. Paku Ulir bh 990.00 4. Paku Sumbat bh 704.00 5. Paku Sekrup 1 1/4" Bh 6,000.00 6. Paku Sekrup 1 1/2" Bh 7,000.00 7. Paku Sekrup 2" Bh 9,000.00 8. Paku Sekrup 2 1/2" Bh 9,000.00 9. Paku Beton 2 x 25" Kg 50,000.00 10. Paku Beton 2,5 x 30" Kg 50,000.00 11. Paku Beton 2,5 x 40" Kg 50,000.00 12. Paku Beton 3 x 50" Kg 50,000.00 13. Paku Beton 3 x 60" Kg 50,000.00 14. Paku Beton 4,2 x 100" Kg 50,000.00 15. Paku Beton 4,3 x 100" Kg 50,000.00 16. Paku Seng 2" besar Kg 29,260.00 17. Paku Seng 1 3/4" kecil Kg 29,260.00 18. Paku Ulin 1" Kg 24,500.00 19. Paku Ulin 1 1/2" Kg 18,000.00 20. Paku Ulin 2" Kg 18,000.00 21. Paku Ulin 3" Kg 18,000.00 22. Paku Ulin 3 1/2" Kg 18,000.00 23. Paku Ulin 4" Kg 18,000.00 1 Paku Biasa 1 1/2" Kg 20,000.00

25. Paku Biasa 2" Kg 15,000.00 26. Paku Biasa 3" Kg 15,000.00 27. Paku Biasa 3 1/2" Kg 15,000.00 28. Paku Biasa 4" Kg 15,000.00 29. Paku Anti Karat Kg 54,450.00

X.3.6.6. Baja

1. Baja Profil WF 150 Kg 21,100.00

2. Pintu Besi 800,000.00

3. Rolling Door 960,000.00

X.3.7. Cat

X.3.7.1. Peralatan Cat

1. Ampelas Lbr 5,000.00 2. Kuas Roll Bh 15,000.00 3. Kuas Bh 12,000.00

M2

M2

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

X.3.7.2. Jenis Cat

X.3.7.2.1. Cat Dasar

1. Cat Meni Kayu Kg 30,000.00 2. Cat Meni Kayu Kg 30,000.00 3. Cat Meni Besi Kg 42,900.00 4. Wall Filler Décor DWF - 200, 4 Kg Klg 83,270.00 5. Eco Emulsion Emulsion EE-4003 warna standard 2,5 Liter Klg 82,720.00 6. Eco Emulsion Emulsion EE-4003 warna standard 20 Liter Klg 561,000.00 7. Plamir Kg 25,000.00 8. Residu Kg 15,000.00 9. Dempul Kg 25,000.00 10. Thinner no. A - 1 Liter Klg 25,000.00 11. Thinner no. 7 - 1 Liter Klg 38,500.00

X.3.7.2.2. Cat Tembok

1. Cat Type 364 - 5 Ltr Klg 70,000.00 2. Cat Type 397 - 5 Ltr Klg 53,750.00 3. Cat Type 393 - 5 Ltr Klg 70,000.00 4. Cat Type 355 - 5 Ltr Klg 70,000.00

Cat Putih - 20 Ltr Klg 276,000.00 Cat Putih - 5 Ltr Klg 70,000.00

5. Elastomeric Wall Paint Premium Full Acrylic Emulsion ( Exterio White - 2.5 Ltr Klg 185,000.00 6. Elastomeric Wall Paint Premium Full Acrylic Emulsion ( Exterio Standard - 2.5 Ltr Klg 191,500.00 7. Wall Paint (Water Base) Pure Acrylic Binder ( Exterior) White - 2.5 Ltr Klg 165,000.00 8. Wall Paint (Water Base) Pure Acrylic Binder ( Exterior) Standard - 2.5 Ltr Klg 171,500.00 9. Wall Paint (Water Base) Modified Acrylic (matt Finish) ( Exterior) White - 2.5 Ltr Klg 66,000.00 10. Wall Paint (Water Base) Pure Acrylic Binder ( Exterior) Standard - 2.5 Ltr Klg 69,500.00 11. Wall Paint (Water Base) Pure Acrylic Binder ( Exterior) Sea Grass - 2.5 Ltr Klg 135,500.00 12. Wall Paint (Water Base) Pure Acrylic Binder ( Exterior) Signal Green - 2.5 Ltr Klg 103,000.00 13. Wall Paint (Water Base) Pure Acrylic Binder ( Exterior) Burnt Orange - 2.5 Ltr Klg 80,600.00 14. Wall Paint (Water Base) Pure Acrylic Binder ( Exterior) Signal Blue - 2.5 Ltr Klg 80,600.00 15. Wall Paint (Water Base) Pure Acrylic Binder ( Exterior) Black - 2.5 Ltr Klg 80,600.00 16. Wall Paint (Water Base) Pure Acrylic Binder ( Exterior) Signal Red - 2.5 Ltr Klg 360,600.00 17. Wall Paint (Solvent Base) Matt Finish Synthetic Acrylic topcoat (exWhite - 5 Ltr Klg 406,500.00 18. Wall Paint (Solvent Base) Matt Finish Synthetic Acrylic topcoat (exStandard - 5 Ltr Klg 612,000.00 19. Wall Paint (Solvent Base) Matt Finish Synthetic Acrylic topcoat (exSpecial - 5 Ltr Klg 530,000.00 20. Wall Paint (Water Base) Anti bacterial & Elastomeric (Interior) White - 1 Ltr Klg 85,100.00 21. Wall Paint (Water Base) Anti bacterial & Elastomeric (Interior) Standard - 1 Ltr Klg 100,800.00 22. Wall Paint (Water Base) Modified Acrylic (High Sheen Finish) ( InWhite - 2.5 Ltr Klg 120,000.00 23. Wall Paint (Water Base) Modified Acrylic (High Sheen Finish) ( InStandard - 2.5 Ltr Klg 131,000.00 24. Cat tembok Durable Elastomeric Exterior Standard - 2.5 Ltr Klg 162,600.00 25. Cat tembok Durable Elastomeric Exterior Special - 2.5 Ltr Klg 176,000.00 26. Cat tembok Acrylic weather shield Standard - 2.5 Ltr Klg 150,000.00 27. Cat tembok Acrylic weather shield Special - 2.5 Ltr Klg 163,700.00 28. Cat tembok Interior Standard - 2.5 Ltr Klg 185,000.00 29. Cat tembok Décor alkali resisting primer - 2.5 Ltr Klg 86,350.00 30. Cat Eksterior Weatershield ( Exterior ) - 2.5 Ltr Klg 200,000.00 31. Cat Interior Interior - 2.5 Ltr Klg 150,000.00

Cat tembok Interior - 20 Ltr Klg 480,000.00 Cat tembok Interior - 2.5 Ltr Klg 80,000.00 Cat tembok Interior - 2.5 Ltr Klg 45,000.00 Cat tembok Interior - 2.5 Ltr Klg 175,000.00 Cat tembok Interior - 2.5 Ltr Klg 80,000.00

X.3.7.2.3. Waterproofing

1. Waterproofing Ultraproof UPR - 960 - 1 Kg Klg 41,600.00 2. Waterproofing Ultraproof UPR - 960 - 4 Kg Klg 138,000.00 3. Waterproofing Ultraproof UPR - 960 - 20 Kg Klg 650,000.00 4. Waterproofing Sikaset Accelerator Per Kg Kg 21,000.00 5. Waterproofing Sika 102 Kg 42,250.00 6. Waterproofing Sika Top 107 Seal Kg 19,000.00 7. Waterproofing Sika Rain Tite Compound (Red & Grey) Kg 42,250.00 8. Waterproofing Sika Rain Tite Membrane Kg 27,500.00 9. Waterproofing Sikaproof 300 RM Kg 110,000.00

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

10. Waterproofing Sikaproof 400 SBS Kg 125,000.00 11. Waterproofing Sikaproof Primer Kg 52,750.00 12. Floor coating Alkyd Paint White - 5 liter Kg 505,000.00 13. Floor coating Alkyd Paint Yellow 2 - 5 liter Kg 505,000.00 14. Floor coating Alkyd Paint Grey - 5 liter Kg 505,000.00 15. Floor coating Alkyd Paint Green - 5 liter Kg 505,000.00 16. Floor coating Alkyd Paint Red - 5 liter Kg 505,000.00 17. Floor coating Alkyd Paint Blue - 5 liter Kg 505,000.00 18. Floor coating Alkyd Paint Black - 5 liter Kg 505,000.00 19. Semen AM 50 Nat Standar 1 liter Kg 13,000.00

X.3.7.2.4. Cat Besi Anti Karat

1. Cat Besi Alkyd/Synthetic Finish White - 1 Liter Klg 61,000.00 2. Cat Besi Alkyd/Synthetic Finish Standard - 1 Liter Klg 72,800.00 3. Cat Besi Durable Interior Water-Base Glaze Special base C - 1 Liter Klg 176,000.00 4. Cat Besi Interior Water based for special effects Golden Glow - 1 Liter Klg 165,000.00 5. Cat Besi Interior Water based for special effects Starlights - 1 Liter Klg 437,500.00 6. Cat Besi Undercoat/sealer (water base) - 1 Liter Klg 45,000.00 7. Cat Besi Undercoat/sealer (solvent base) - 1 Liter Klg 63,000.00 8. Cat Besi Alkyd Undercoat - 1 Liter Klg 61,500.00 9. Cat Besi Thinner PT - 20 Liter Klg 320,000.00 10. Cat Besi PUT - 603 - 1 Kg/Set Klg 115,000.00 11. Cat Besi PUT - 603 - 5 Kg/Set Klg 535,000.00 12. Cat Besi PUT - 603 - 20 Kg/Set Klg 2,026,000.00 13. Cat Besi Thinner Epoxy - 0.8 Liter Klg 28,000.00 14. Cat Besi Thinner Epoxy - 3.8 Liter Klg 145,000.00 15. Cat Besi Thinner Epoxy - 20 Liter Klg 715,000.00 16. Cat Besi Thinner UT - 02 - 0.8 Liter Klg 31,500.00 17. Cat Besi Thinner UT - 02 - 3.8 Liter Klg 144,000.00 18. Cat Besi Thinner UT - 02 - 20 Liter Klg 715,000.00 19. Cat Besi 624 Klg 78,980.00 20. Cat Besi 627 Klg 78,980.00 21. Cat Besi 660 Klg 78,980.00 22. Cat Besi 622 Klg 78,980.00 23. Cat Besi 623 Klg 78,980.00 24. Cat Besi 406 (Coklat Tua) Klg 51,700.00 25. Cat Besi 899 (Hijau) Klg 51,700.00 26. Cat Besi 879 (Abu-abu) Klg 51,700.00 27. Cat Besi 3044/083 (Coklat) Klg 51,700.00 28. Cat Besi 9102 (Putih) Klg 51,700.00 29. Cat Besi Hitam Klg 51,700.00 30. Cat Besi Coklat 084 Klg 51,700.00 31. Cat Besi Hijau 222 Klg 51,700.00

X.3.7.2.5. Tennokote Tennis Court Coating

1. Cat Lap.Tennis TNK - 1000 WA - 5 Kg Klg 225,500.00 2. Cat Lap.Tennis TNK - 1020 WA - 5 Kg Klg 19,250.00

X.3.7.2.6. Cat Kayu

1. Cat Kayu (Interior) Wood Filler - 1 kg Klg 26,000.00 2. Cat Kayu (Interior) Wood Stain (Pewarna kayu Warna muda - 1 liter Klg 50,000.00 3. Cat Kayu (Interior) Wood Stain (Pewarna kayu Warna tua - 1 liter Klg 55,000.00 4. Cat Kayu (Interior) Melamine system Clear Dof,Clear Gloss - 1 liter Klg 45,000.00 5. Cat Kayu (Interior) Melamine system Semi gloss (cat akhir) - 5 liter Klg 176,000.00 6. Cat Kayu (Interior) NC System Clear Dof,Clear Gloss - 1 liter Klg 41,000.00 7. Cat Kayu (Interior) NC System Semi gloss (cat akhir) - 5 liter Klg 185,000.00 8. Cat Kayu (Interior) Ultran Politur Standard - 1 liter Klg 59,500.00 9. Cat Kayu (Interior) Ultran Politur Clear Dof,Clear Gloss - 1 liter Klg 59,500.00 10. Cat Kayu (Exterior) Ultran Politur Warna transparant - 1 liter Klg 45,000.00 11. Cat Kayu (Exterior) Ultran Politur Warna Oxide - 1 liter Klg 45,000.00 12. Cat Kayu (Exterior) Ultran Politur Natural Gloss, Natural Dof - 1 liter Klg 56,500.00 13. Cat Kayu (Exterior) Thinner Ultran Politur - 0.8 liter Klg 25,000.00 14. Cat Kayu (Exterior) Ultran Lasur Warna transparant - 1 liter Klg 61,000.00 15. Cat Kayu (Exterior) Ultran Lasur Warna Oxide - 1 liter Klg 64,000.00 16. Cat Kayu (Exterior) Ultran Lasur Natural Gloss, Natural Dof - 1 liter Klg 66,000.00 17. Cat Kayu (Exterior) Thinner Lasur - 0.8 liter Klg 24,000.00

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

18. Cat Kayu - 1 liter Klg 49,500.00

X.3.8. Multipleks

1. Triplek 3 mm Lbr 60,000.00 2. Triplek 3,2 mm Lbr 46,000.00 3. Triplek 4 mm Lbr 60,000.00 4. Triplek 6 mm Lbr 77,000.00 5. Triplek 9 mm Lbr 100,000.00 6. Triplek 12 mm Lbr 135,000.00 7. Triplek 18 mm Lbr 210,000.00 8. Melamine Lbr 121,000.00 9. Teakwood 3 mm Lbr 121,000.00 10. Teakwood 4 mm Lbr 265,650.00 11. Triplek lapis aluminium Lbr 205,150.00 12. Lumbercoll 16 mm Lbr 185,000.00 13. Multiplek Mega sungkai 3 mm Lbr 110,000.00

X.3.9. Bahan Pelapis Dinding

X.3.9.1. Kaca

1. Kaca Bening 3 mm 123,200.00

2. Kaca Bening 5 mm 135,000.00

3. Kaca Bening 6 mm 228,250.00

4. Kaca Bening 8 mm 308,000.00

5. Kaca Bening 10 mm 431,200.00

6. Kaca Bening 12 mm 554,400.00

7. Kaca Rayband 3 mm 137,500.00

8. Kaca Rayband 10 mm 352,000.00

9. Kaca Rayband 12 mm 566,500.00

10. Kaca Grafir 5 mm 665,000.00

11. Kaca Grafir 8 mm 832,000.00

11. Kaca Buram Polos 5 mm 256,000.00

12. Kaca Buram Polos 8 mm 448,000.00

12. Kaca Buram Motif 5 mm 448,000.00

13. Kaca Buram Motif 8 mm 640,000.00

14. Kaca Patri 13 mm 1,408,000.00

15. Kaca Flash 5 mm 576,000.00

16. Kaca RD 5 mm 448,000.00

X.3.9.2. Gypsum

1. Gypsum Standard Board Ukuran 9 x 1200 x 2400 mm 56,000.00

2. Gypsum Standard Board Ukuran 12 x 1200 x 2400 mm 39,600.00

3. Gypsum Fireshield Ukuran 12 x 1200 x 2400 mm 85,800.00

4. Gypsum Fireshield Ukuran 15 x 1200 x 2400 mm 93,500.00

5. Gypsum Moistureshield Ukuran 9 x 1200 x 2400 mm 77,000.00

6. Gypsum Moistureshield Ukuran 12 x 1200 x 2400 mm 85,800.00

7. Gypsum Moistureshield Ukuran 15 x 1200 x 2400 mm 94,600.00

8. Gypsum Denseshield Ukuran 12 x 1200 x 2400 mm 85,800.00

9. Gypsum Denseshield Ukuran 15 x 1200 x 2400 mm 94,600.00

X.3.9.3. GRC

1. GRC (External) Ukuran 9 x 300 x 2440 mm Lbr 95,150.00 2. GRC (External) Ukuran 9 x 1220 x 2440 mm Lbr 302,500.00 3. GRC (External) Ukuran 12 x 1220 x 2440 mm Lbr 409,200.00 4. GRC (External) Ukuran 15 x 1220 x 2440 mm Lbr 540,100.00 5. GRC (External) Ukuran 4 x 600 x 2440 mm Lbr 26,620.00 6. GRC (External) Ukuran 9 x 100 x 2440 mm Lbr 37,620.00 7. GRC (External) Ukuran 9 x 200 x 2440 mm Lbr 67,100.00 8. GRC (Internal) Ukuran 4 x 1220 x 2440 mm Lbr 95,000.00 9. GRC (Internal) Ukuran 5 x 1220 x 2440 mm Lbr 113,300.00 10. GRC (Internal) Ukuran 6 x 1220 x 2440 mm Lbr 154,000.00

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

11. GRC (Internal) Ukuran 8 x 1220 x 2440 mm Lbr 220,000.00 12. GRC (Internal) Ukuran 10 x 1220 x 2440 mm Lbr 250,000.00

X.3.9.4. Aluminium Panel

1. Aluminium composit T = 4 mm 1,605,000.00

2. Aluminium composit T = 6 mm Uk. 2 m x 3.02 m 1,605,000.00

3. Aluminium composit T = 4 mm Uk.Lebar

1220 x 1250 1,475,000.00

4. Aluminium composit (XL/XX) t. 4 mm Uk.Lebar

1220 Panj. 2440, 3100, 4200 1,250,000.00

5. Aluminium composit (XI) t. 4 mm Uk.Lebar

1220 Panj. 2440, 3100, 4200 1,220,000.00

6. Aluminium composit T. 4 mm Uk.Lebar

1220 Panj. 2440, 3100, 4200 1,475,000.00

7. Aluminium composit T. 4 mm Uk.Lebar

1220 Panj. 2440, 3100, 4200 1,350,000.00

X.3.9.5. Kalsi Board

1. Kalsi Board Ukuran 1200 x 2400 x 3.5 mm Lbr 49,400.00 2. Kalsi Board Ukuran 1200 x 2400 x 4.5 mm Lbr 75,000.00 3. Kalsi Board Ukuran 1200 x 2400 x 6 mm Lbr 98,000.00 4. Kalsi Board Ukuran 1200 x 2400 x 9 mm Lbr 160,000.00 5. Kalsi Board Ukuran 1200 x 2400 x 12 mm Lbr 204,000.00

X.3.9.6. Accoustic Ceiling

1. Accoustic Ceiling Ukuran 15 x 600 x 1200 mm Lbr2. Suspension/Exposed (Ro Ukuran 600 x 600 mm Meter

4 mm, Main T/Cross T. 24 mm, Wall Angle L Metal)

X.3.10. Bahan Pelapis Lantai

X.3.10.1. Granito Tile

1. Granito Tile Castello Rustic ( unpolished ), Silver Ukuran 30 x 30 cm Box 186,533.00 2. Granito Tile Castello Rustic ( unpolished ), Gold Ukuran 30 x 30 cm Box 201,850.00 3. Granito Tile Salt & Pepper Unpolished Grup A Ukuran 30 x 30 cm Box 184,500.00 4. Granito Tile Salt & Pepper Polished Grup A Ukuran 30 x 30 cm Box 258,000.00 5. Granito Tile Salt & Pepper Rock Grup A Ukuran 30 x 30 cm Box 173,800.00 6. Granito Tile Salt & Pepper Stepnose Grup A Ukuran 30 x 30 cm Bh 34,200.00 7. Granito Tile Salt & Pepper Unpolished Grup B Ukuran 30 x 30 cm Box 211,167.00 8. Granito Tile Salt & Pepper Polished Grup B Ukuran 30 x 30 cm Box 283,689.00 9. Granito Tile Salt & Pepper Rock Grup B Ukuran 30 x 30 cm Box 185,000.00 10. Granito Tile Salt & Pepper Stepnose Grup B Ukuran 30 x 30 cm Bh 37,500.00 11. Granito Tile Salt & Pepper Unpolished Grup C Ukuran 30 x 30 cm Box 240,000.00 12. Granito Tile Salt & Pepper Polished Grup C Ukuran 30 x 30 cm Box 322,083.00 13. Granito Tile Salt & Pepper Rock Grup C Ukuran 30 x 30 cm Box 225,030.00 14. Granito Tile Salt & Pepper Stepnose Grup C Ukuran 30 x 30 cm Bh 40,500.00 15. Granito Tile Travertine Honed Grup A Ukuran 30 x 30 cm Box 318,900.00 16. Granito Tile Travertine Polished Grup A Ukuran 30 x 30 cm Box 371,000.00 17. Granito Tile Travertine Honed Grup B Ukuran 30 x 30 cm Box 366,000.00 18. Granito Tile Travertine Polished Grup B Ukuran 30 x 30 cm Box 418,000.00 19. Granito Tile Big Grain Unpolished Grup A Ukuran 30 x 30 cm Box 258,000.00 20. Granito Tile Big Grain Polished Grup A Ukuran 30 x 30 cm Box 305,000.00 21. Granito Tile Marble Honed Grup A Ukuran 30 x 30 cm Box 269,000.00 22. Granito Tile Marble Polished Grup A Ukuran 30 x 30 cm Box 321,000.00 23. Granito Tile Domus Unpolished Grup A Ukuran 30 x 30 cm Box 246,000.00 24. Granito Tile Flame Rock Grup A Ukuran 30 x 30 cm Box 246,000.00 25. Granito Tile Ructic Ukuran 30 x 30 cm Box 170,000.00 26. Granito Tile Salsa Oasis ( unpolished ), Silver Ukuran 40 x 40 cm Box 202,400.00 27. Granito Tile Salsa Crystal ( polished ), Silver Ukuran 40 x 40 cm Box 249,700.00 28. Granito Tile Salsa Oasis ( unpolished ), Gold Ukuran 40 x 40 cm Box 228,800.00 29. Granito Tile Salsa Crystal ( polished ), Gold Ukuran 40 x 40 cm Box 268,400.00 30. Granito Tile Palazzo Mirror ( polished ), Silver Ukuran 40 x 40 cm Box 270,000.00 31. Granito Tile Palazzo Mirror ( polished ), Gold Ukuran 40 x 40 cm Box 316,800.00 32. Granito Tile Salt & Pepper Unpolished Grup A Ukuran 40 x 40 cm Box 185,000.00

M2

M2

mm M2

mm M2

mm M2

mm M2

mm M2

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

33. Granito Tile Salt & Pepper Polished Grup A Ukuran 40 x 40 cm Box 258,000.00 34. Granito Tile Salt & Pepper Unpolished Grup B Ukuran 40 x 40 cm Box 211,000.00 35. Granito Tile Salt & Pepper Polished Grup B Ukuran 40 x 40 cm Box 284,000.00 36. Granito Tile Salt & Pepper Unpolished Grup C Ukuran 40 x 40 cm Box 240,000.00 37. Granito Tile Salt & Pepper Polished Grup C Ukuran 40 x 40 cm Box 322,000.00 38. Granito Tile Travertine Honed Grup A Ukuran 40 x 40 cm Box 319,000.00 39. Granito Tile Travertine Polished Grup A Ukuran 40 x 40 cm Box 371,000.00 40. Granito Tile Travertine Honed Grup B Ukuran 40 x 40 cm Box 366,000.00 41. Granito Tile Travertine Polished Grup B Ukuran 40 x 40 cm Box 418,000.00 42. Granito Tile Big Grain Polished Grup A Ukuran 40 x 40 cm Box 317,000.00 43. Granito Tile Big Grain Unpolished Grup A Ukuran 40 x 40 cm Box 264,500.00 44. Granito Tile Marble Honed Grup A Ukuran 40 x 40 cm Box 269,000.00 45. Granito Tile Marble Polished Grup A Ukuran 40 x 40 cm Box 321,000.00 46. Granito Tile Domus Unpolished Grup A Ukuran 40 x 40 cm Box 246,000.00 47. Granito Tile Flame Rock Grup A Ukuran 40 x 40 cm Box 246,000.00 48. Granito Tile Ructic Ukuran 40 x 40 cm Box 184,000.00 49. Granito Tile Salsa Crystal ( polished ), Silver Ukuran 60 x 60 cm Box 295,900.00 50. Granito Tile Palazzo Mirror ( polished ), Silver Ukuran 60 x 60 cm Box 346,500.00 51. Granito Tile Palazzo Mirror ( polished ), Gold Ukuran 60 x 60 cm Box 366,300.00 52. Granito Tile Aurora Mirror ( polished ), Silver Ukuran 60 x 60 cm Box 347,700.00 53. Granito Tile Aurora Mirror ( polished ), Gold Ukuran 60 x 60 cm Box 403,700.00 54. Granito Tile Sejati Polished Ukuran 60 x 60 cm Box 195,200.00 55. Granito Tile Sejati AL - Polished Ukuran 60 x 60 cm Box 236,800.00 56. Granito Tile Sejati YS - Polished Ukuran 60 x 60 cm Box 275,200.00 57. Granito Tile San Remo (Rustic) Ukuran 60 x 60 cm Box 360,000.00 58. Granito Tile Nordic 1 - 4 Ukuran 60 x 60 cm Box 282,000.00 59. Granito Tile Salsa & Pepper ( Grup A ) Ukuran 60 x 60 cm Box 351,000.00 60. Granito Tile Salsa & Pepper ( Grup B ) Ukuran 60 x 60 cm Box 366,000.00 61. Granito Tile Travertine ( Grup A ) Ukuran 60 x 60 cm Box 348,700.00 62. Granito Tile Travertine ( Grup B ) Ukuran 60 x 60 cm Box 436,000.00 63. Granito Tile Marble Polished Ukuran 60 x 60 cm Box 386,000.00 64. Granito Tile Marble Honed Ukuran 60 x 60 cm Box 341,200.00 65. Granito Tile Domus ( Grup A ) unpolished Ukuran 60 x 60 cm Box 282,600.00 66. Granito Tile Cove Ukuran 20 x 10 cm Box 618,500.00 67. Granito Tile Utility Tile Ukuran 20 x 20 cm Box 176,000.00 68. Granito Tile Mosaics Jasmine Ukuran 90 x 90 cm Bh 126,000.00 69. Granito Tile Mosaics Sonar Ukuran 90 x 90 cm Bh 985,500.00 70. Granito Tile Mosaics Venus Ukuran 160 x 120 cm Bh 1,689,000.00

X.3.10.2. Keramik

1. Keramik Dinding Polos Ukuran 20 x 20 cm Box 53,900.00 2. Keramik Dinding Special ( Warna Muda ) Ukuran 20 x 20 cm Box 57,530.00 3. Keramik Roxy Ukuran 20 x 20 cm Box 526,900.00 4. Keramik Ukuran 20 x 20 cm Box 53,900.00 1 Keramik Ukuran 10 x 20 cm Box 61,600.00 6. Keramik Ukuran 20 x 20 cm Box 50,600.00 7. Keramik Dinding Polos Ukuran 20 x 25 cm Box 60,000.00 8. Keramik Dinding Special ( Warna Muda ) Ukuran 20 x 25 cm Box 61,050.00 9. Keramik Dinding Medium ( Warna Tua ) Ukuran 20 x 25 cm Box 64,350.00 10. Keramik Ukuran 20 x 25 cm Box 66,000.00 11. Keramik Dinding List Ukuran 7.5 x 20 cm Bh 8,000.00 12. Keramik Dinding Special Ukuran 25 x 40 cm Box 114,950.00 13. Keramik Dinding Medium Ukuran 25 x 40 cm Box 122,100.00 14. Keramik Ukuran 25 x 40 cm Box 106,700.00 15. Keramik Dinding List Ukuran 7.5 x 20 cm Bh 17,000.00 16. Keramik Dinding Premium Ukuran 25 x 40 cm Box 132,000.00 17. Keramik Dinding Exclusive A Ukuran 25 x 40 cm Box 141,000.00 18. Keramik Dinding List Ukuran 7.5 x 20 cm Bh 29,000.00 19. Keramik Dinding Premium Ukuran 30 x 50 cm Box 148,000.00 20. Keramik Dinding Exclusive A Ukuran 30 x 50 cm Box 156,000.00 21. Keramik Murano Ukuran 30 x 30 cm Box 45,650.00 22. Keramik Jungle/Etna Ukuran 30 x 30 cm Box 46,860.00 23. Keramik Orient/Marmol/Capri/Milo Ukuran 30 x 30 cm Box 48,070.00 24. Keramik Newton/Nori/Marble Ukuran 30 x 30 cm Box 48,950.00 25. Keramik Corsica Ukuran 30 x 30 cm Box 52,800.00

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

26. Keramik Oscar Ukuran 30 x 30 cm Box 65,000.00 27. Keramik Petra Ukuran 30 x 30 cm Box 56,100.00 28. Keramik Dinding List Ukuran 7.5 x 20 cm Bh 38,500.00 29. Keramik Lantai Rustic Ukuran 30 x 30 cm Box 60,000.00 30. Keramik Ukuran 30 x 30 cm Box 49,500.00 31. Keramik Ukuran 30 x 30 cm Box 56,100.00 32. Keramik Lantai Special Ukuran 40 x 40 cm Box 71,500.00 33. Keramik Lantai Medium Ukuran 40 x 40 cm Box 73,700.00 34. Keramik Murano Ukuran 40 x 40 cm Box 51,700.00 35. Keramik Torino/Galleria Ukuran 40 x 40 cm Box 55,000.00 36. Keramik Tahiti Ukuran 40 x 40 cm Box 56,100.00 37. Keramik Genesis Ukuran 40 x 40 cm Box 59,400.00 38. Keramik Caracas Ukuran 40 x 40 cm Box 59,400.00 39. Keramik Cordon Ukuran 40 x 40 cm Box 64,900.00 40. Keramik Albatros Ukuran 40 x 40 cm Box 66,000.00 41. Keramik Ozone Ukuran 40 x 40 cm Box 71,500.00 42. Keramik Ukuran 40 x 40 cm Box 63,800.00 43. Keramik Ukuran 40 x 40 cm Box 57,200.00 44. Keramik Normay (Dasar terang) Ukuran 40 x 40 cm Box 63,800.00 45. Keramik Normay (Dasar gelap) Ukuran 40 x 40 cm Box 66,000.00 46. Keramik Liceo ( dasar gelap) Ukuran 40 x 40 cm Box 84,700.00 47. Keramik Liceo ( dasar terang) Ukuran 40 x 40 cm Box 79,200.00 48. Keramik Putih polos Ukuran 40 x 40 cm Box 56,100.00 49. Keramik Dasar terang Ukuran 40 x 40 cm Box 58,300.00 50. Keramik Dasar gelap Ukuran 40 x 40 cm Box 60,500.00 51. Keramik Lantai Special Ukuran 45 x 45 cm Box 77,000.00 52. Keramik Lantai Medium Ukuran 45 x 45 cm Box 80,300.00

X.3.10.3. Dan Lain-lain

1. Wallpaper 243,000.00

2. Wallpaper 282,000.00

3. Vertical Blind 243,000.00

4. Horizontal Blind 192,000.00

5. Wood Blind 154,000.00

6. Wood Blind 128,000.00

X.3.10.3. Lantai Parket (Lantai Kayu)

X.3.10.3.1. Lantai Parket

1. Lantai Kayu Costul (DCW) Ukuran 12 x 102 x 900 430,000.00

2. Lantai Kayu Costul (DCW) Ukuran 12 x 140 x 900 430,000.00

3. Lantai Kayu Costul (DCW) Ukuran 12 x 140 x 915 430,000.00

4. Lantai Kayu Costul (DCW) Ukuran 12 x 140 x 925 430,000.00

5. Lantai Kayu Kalimantan Poon Ukuran 12 x 102 x 900 530,000.00

6. Lantai Kayu Kalimantan Poon Ukuran 12 x 140 x 900 530,000.00

7. Lantai Kayu Kalimantan Poon Ukuran 12 x 140 x 900 530,000.00

8. Lantai Kayu Kalimantan Poon Ukuran 12 x 140 x 915 530,000.00

9. Lantai Kayu Kalimantan Poon Ukuran 12 x 140 x 925 530,000.00

10. Lantai Kayu Light Nyatoh Ukuran 12 x 102 x 900 530,000.00

11. Lantai Kayu Light Nyatoh Ukuran 12 x 140 x 900 530,000.00

12. Lantai Kayu Light Nyatoh Ukuran 12 x 140 x 915 530,000.00

13. Lantai Kayu Light Nyatoh Ukuran 12 x 140 x 925 530,000.00

M2

M2

M2

M2

M2

M2

mm M2

mm M2

mm M2

mm M2

mm M2

mm M2

mm M2

mm M2

mm M2

mm M2

mm M2

mm M2

mm M2

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

14. Lantai Kayu Golden Rosewood Ukuran 12 x 102 x 900 580,000.00

15. Lantai Kayu Golden Rosewood Ukuran 12 x 140 x 900 580,000.00

16. Lantai Kayu Golden Rosewood Ukuran 12 x 140 x 915 580,000.00

17. Lantai Kayu Golden Rosewood Ukuran 12 x 140 x 925 580,000.00

18. Lantai Kayu Costul (DCW) 28 x 180 x 1000 mm 860,000.00

19. Lantai Kayu Costul (DCW) 28 x 180 x 2000 mm 860,000.00

20. Lantai Kayu Basic Collection 7 mm x 19 cm x 128.5 cm 506,000.00

21. Lantai Kayu Comfort Collection 8 mm x 19 cm x 128.5 cm 545,000.00

22. Lantai Kayu Ukuran 8 mm x 19 cm x 121 cm 428,000.00

23. Lantai Kayu Ukuran 8 mm x 19 cm x 121 cm 428,000.00

24. Lantai Kayu Ukuran 8 mm x 19 cm x 121 cm 488,000.00

X.3.10.3.2. Pelengkap Lantai Parket

1. Lem Perekat Khusus Berat 400 gram Botol 50,000.00 2. Lem Perekat Khusus Berat 800 gram Botol 94,000.00

3. PE Foam Tebal 3 mm 13,000.00

4. PE Foam Warna Abu-abu 25,000.00

5. PE Foam Warna Putih 12,000.00

6. Step Nosing Kayu Tongue Panjang 1,2 m Btg 36,000.00 7. Step Nosing Kayu Tongue Panjang 2,4 m Btg 72,500.00 8. Step Nosing Kayu Groove Panjang 1,2 m Btg 36,000.00 9. Step Nosing Kayu Groove Panjang 2,4 m Btg 72,500.00 10. Plin Lantai MDF Ukuran 4 c x Panjang 2.5 m Btg 227,000.00 11. Plin Lantai MDF Ukuran 6 c x Panjang 2.4 m Btg 253,000.00 12. Plin Lantai MDF Ukuran 6 c x Panjang 2.4 m Btg 278,000.00 13. Lis Jepit Bawah Pintu Aluminium Panjang 2,7 m Btg 430,000.00 14. Lis Jepit Bawah Pintu MDF Panjang 2,4 m Btg 480,000.00 15. Lis Jepit Bawah Pintu MDF Panjang 2,7 m Btg 544,000.00 16. Lis Jepit Antar Parket Aluminium Panjang 2,7 m Btg 468,000.00 17. Lis Jepit Antar Parket MDF Panjang 2,4 m Btg 480,000.00 18. Lis Jepit Antar Parket MDF Panjang 2,7 m Btg 544,000.00 19. Step Noosing Tangga Aluminium Panjang 2,7 m Btg 686,000.00 20. Step Noosing Tangga MDF Motif Kayu Panjang 2,4 m Btg 480,000.00

X.3.10.4. Paving Block

1. Paving Block Serasi Abu-Abu (6 cm) isi 44 Bh 2,100.00

2. Paving Block Serasi Merah (6 cm) isi 44 Bh 2,980.00

3. Paving Block Serasi Abu-Abu (8 cm) isi 44 Bh 2,380.00

4. Paving Block Serasi Merah (8 cm) isi 44 Bh 3,460.00

5. Paving Block Tiga Berlian Abu-Abu (6 cm) isi 35 Bh 2,380.00

6. Paving Block Tiga Berlian Merah (6 cm) isi 35 Bh 3,260.00

7. Paving Block Tiga Berlian Abu-Abu (8 cm) isi 35 Bh 2,660.00

8. Paving Block Tiga Berlian Merah (8 cm) isi 35 Bh 3,740.00

9. Paving Block Diagonal Abu-Abu (6 cm) isi 40 Bh 2,240.00

10. Paving Block Diagonal Merah (6 cm) isi 40 Bh 3,446.00

11. Paving Block Diagonal Abu-Abu (8 cm) isi 40 Bh 2,520.00

12. Paving Block Diagonal Merah (8 cm) isi 40 Bh 3,600.00

13. Paving Block Bata Abu-Abu (6 cm) isi 48 Bh 1,960.00

14. Paving Block Bata Merah (6 cm) isi 48 Bh 2,840.00

15. Paving Block Bata Abu-Abu (8 cm) isi 48 Bh 2,240.00

16. Paving Block Bata Merah (8 cm) isi 48 Bh 3,320.00

mm M2

mm M2

mm M2

mm M2

Ukuran M2

Ukuran M2

Ukuran M2

Ukuran M2

Ukuran M2

Ukuran M2

Ukuran M2

M2

M2

M2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

17. Paving Block Gras Block Abu-Abu (6 cm) isi 9 Bh 10,500.00

18. Paving Block Diagonal Jumbo Abu-Abu(6 cm) isi 30 Bh 3,920.00

19. Paving Block Diagonal Jumbo Merah (6 cm) isi 30 Bh 5,400.00

20. Paving Block Diagonal Jumbo Abu-Abu(8 cm) isi 30 Bh 5,400.00

21. Paving Block Diagonal Jumbo Merah (8 cm) isi 30 Bh 5,400.00

22. Paving Block Benteng Abu-Abu (6 cm) isi 35 Bh 980.00

23. Paving Block Benteng Merah (6 cm) isi 35 Bh 1,420.00

24. Paving Block Benteng Abu-Abu (8 cm) isi 35 Bh 1,120.00

25. Paving Block Benteng Merah (8 cm) isi 35 Bh 1,660.00

26. Paving Block K 225 Serasi Abu-Abu (6 cm) isi 44 Bh 2,600.00

27. Paving Block K 225 Serasi Merah (6 cm) isi 44 Bh 3,600.00

28. Paving Block K 225 Serasi Abu-Abu (8 cm) isi 44 Bh 3,000.00

29. Paving Block K 225 Serasi Merah (8 cm) isi 44 Bh 4,000.00

30. Paving Block K 225 Tiga Berlian Abu-Abu (6 cm) isi 35 Bh 3,000.00

31. Paving Block K 225 Tiga Berlian Merah (6 cm) isi 35 Bh 4,000.00

32. Paving Block K 225 Tiga Berlian Abu-Abu (8 cm) isi 35 Bh 3,200.00

33. Paving Block K 225 Tiga Berlian Merah (8 cm) isi 35 Bh 4,500.00

34. Paving Block K 225 Diagonal Abu-Abu (6 cm) isi 40 Bh 3,000.00

35. Paving Block K 225 Diagonal Merah (6 cm) isi 40 Bh 4,000.00

36. Paving Block K 225 Diagonal Abu-Abu (8 cm) isi 40 Bh 4,200.00

37. Paving Block K 225 Diagonal Merah (8 cm) isi 40 Bh 4,300.00

38. Paving Block K 225 Bata Abu-Abu (6 cm) isi 48 Bh 2,500.00

39. Paving Block K 225 Bata Merah (6 cm) isi 48 Bh 3,500.00

40. Paving Block K 225 Bata Abu-Abu (8 cm) isi 48 Bh 3,000.00

41. Paving Block K 225 Bata Merah (8 cm) isi 48 Bh 4,000.00

42. Paving Block K 225 Gras Block Abu-Abu (6 cm) isi 9 Bh 11,600.00

43. Paving Block K 225 Diagonal Jumbo Abu-Abu(6 cm) isi 30 Bh 3,300.00

44. Paving Block K 225 Diagonal Jumbo Merah (6 cm) isi 30 Bh 3,600.00

45. Paving Block K 225 Diagonal Jumbo Abu-Abu(8 cm) isi 30 Bh 3,600.00

46. Paving Block K 225 Diagonal Jumbo Merah (8 cm) isi 30 Bh 3,800.00

47. Paving Block K 225 Benteng Abu-Abu (6 cm) isi 35 Bh 3,000.00

48. Paving Block K 225 Benteng Merah (6 cm) isi 35 Bh 4,000.00

49. Paving Block K 225 Benteng Abu-Abu (8 cm) isi 35 Bh 3,300.00

50. Paving Block K 225 Benteng Merah (8 cm) isi 35 Bh 4,500.00

51. Paving Block 300 Serasi Abu-Abu (6 cm) isi 44 Bh 3,150.00

52. Paving Block 300 Serasi Merah (6 cm) isi 44 Bh 4,470.00

53. Paving Block 300 Serasi Abu-Abu (8 cm) isi 44 Bh 3,570.00

54. Paving Block 300 Serasi Merah (8 cm) isi 44 Bh 5,190.00

55. Paving Block 300 Tiga Berlian Abu-Abu (6 cm) isi 35 Bh 3,570.00

56. Paving Block 300 Tiga Berlian Merah (6 cm) isi 35 Bh 4,850.00

57. Paving Block 300 Tiga Berlian Abu-Abu (8 cm) isi 35 Bh 3,990.00

58. Paving Block 300 Tiga Berlian Merah (8 cm) isi 35 Bh 5,610.00

59. Paving Block 300 Diagonal Abu-Abu (6 cm) isi 40 Bh 3,360.00

60. Paving Block 300 Diagonal Merah (6 cm) isi 40 Bh 5,169.00

61. Paving Block 300 Diagonal Abu-Abu (8 cm) isi 40 Bh 3,780.00

62. Paving Block 300 Diagonal Merah (8 cm) isi 40 Bh 5,400.00

63. Paving Block 300 Bata Abu-Abu (6 cm) isi 48 Bh 3,940.00

64. Paving Block 300 Bata Merah (6 cm) isi 48 Bh 4,260.00

65. Paving Block 300 Bata Abu-Abu (8 cm) isi 48 Bh 3,360.00

66. Paving Block 300 Bata Merah (8 cm) isi 48 Bh 4,980.00

67. Paving Block 300 Gras Block Abu-Abu (6 cm) isi 9 Bh 11,700.00

68. Paving Block 300 Diagonal Jumbo Abu-Abu(6 cm) isi 30 Bh 3,500.00

69. Paving Block 300 Diagonal Jumbo Merah (6 cm) isi 30 Bh 3,700.00

70. Paving Block 300 Diagonal Jumbo Abu-Abu(8 cm) isi 30 Bh 3,700.00

71. Paving Block 300 Diagonal Jumbo Merah (8 cm) isi 30 Bh 4,000.00

72. Paving Block 300 Benteng Abu-Abu (6 cm) isi 35 Bh 3,570.00

73. Paving Block 300 Benteng Merah (6 cm) isi 35 Bh 4,890.00

74. Paving Block 300 Benteng Abu-Abu (8 cm) isi 35 Bh 3,990.00

75. Paving Block 300 Benteng Merah (8 cm) isi 35 Bh 5,610.00

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

/m2

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

X.3.10.5. Kansteen

1. Kansteen Type K.225 15/20 x 30 x 50 cm Bh 41,681.00 2. Kansteen Type K.300 15/20 x 30 x 50 cm Bh 49,883.00 3. Kansteen Type K.225 15/20 x 20 x 50 cm Bh 33,750.00 4. Kansteen Type K.300 15/20 x 20 x 50 cm Bh 39,555.00 5. Kansteen Type K.225 20/20 x 30 x 50 cm Bh 36,750.00 6. Kansteen Type K.300 20/20 x 30 x 50 cm Bh 43,200.00 7. Kansteen Type K.225 15/20 x 40 x 50 cm Bh 33,850.00 8. Kansteen Type K.300 15/20 x 40 x 50 cm Bh 49,950.00 9. Kansteen Type K.225 15/20 x 30 x 40 cm Bh 33,000.00 10. Kansteen Type K.300 15/20 x 30 x 40 cm Bh 34,300.00

X.3.10.6. Tegel/Ubin

1. Tegel/Ubin Grys Warna 30 x 30 cm Bh 4,500.00 2. Tegel/Ubin Grys Warna 20 x 20 cm Bh 2,200.00 3. Tegel/Ubin Grys Abu-abu 30 x 30 cm Bh 4,000.00 4. Tegel/Ubin Grys Abu-abu 20 x 20 cm Bh 2,000.00

X.3.11. Bahan Penutup Atap

1. Atap Sirap Bh 650.00 2. Tilux Lbr 44,000.00 3. Atap tegola M2 250,000.00 4. Atap Onduline 90 x 180 cm Lbr 198,000.00 5. Asbes Gelombang Lbr 58,000.00 6. Bubungan Asbes Gelombang Bh 45,000.00

Talang PVC 75,000.00

X.3.11.1. Genteng Press

1. Genteng Beton Kia Natural Isi 20 Bh 4,725.00

2. Genteng Beton Kia Cat Air 1x Isi 20 Bh 2,600.00

3. Genteng Beton Kia Cat Air 2x Isi 20 Bh 3,350.00

4. Genteng Beton Garuda Natural Isi 20 Bh 4,725.00

5. Genteng Beton Garuda Cat Air 1x Isi 20 Bh 2,600.00

6. Genteng Beton Garuda Natural 2x Isi 20 Bh 3,350.00

7. Genteng Beton Garuda Natural Isi 12 Bh 6,025.00

8. Genteng Beton Garuda Cat Air 1x Isi 12 Bh 4,300.00

9. Genteng Beton Garuda Cat Air 2x Isi 12 Bh 5,000.00

10. Genteng Beton SafariI Natural Isi 12 Bh 3,800.00

11. Genteng Beton Safari Cat Air 1x Isi 12 Bh 6,025.00

12. Genteng Beton Safari Cat Air 2x Isi 12 Bh 5,000.00

13. Genteng Beton Amsterdam/Flat Natural Isi 9 Bh 6,025.00

14. Genteng Beton Amsterdam/Flat Cat Air 1x Isi 9 Bh 5,586.00

15. Genteng Beton Amsterdam/Flat Cat Air 2x Isi 9 Bh 6,900.00

16. Genteng Beton Bubungan Bulat Natural Isi 3,5 Bh 7,425.00

17. Genteng Beton Bubungan Bulat Cat Air 1x Isi 3,5 Bh 5,875.00

18. Genteng Beton Bubungan Bulat Cat Air 2x Isi 3,5 Bh 6,027.00

19. Genteng Beton Bubungan Piramid Natural Isi 3,5 Bh 5,145.00

20. Genteng Beton Bubungan Piramid Cat Air 1 Isi 3,5 Bh 6,875.00

21. Genteng Beton Bubungan Piramid Cat Air Isi 3,5 Bh 6,027.00

22. Genteng Beton Nok Bubungan Bulat Natural Bh 7,938.00 23. Genteng Beton Nok Bubungan Bulat Cat Air 1x Bh 6,645.00 24. Genteng Beton Nok Bubungan Bulat Cat Air 2x Bh 7,000.00 25. Genteng Beton Nok Bubungan Piramid Natural Bh 7,938.00 26. Genteng Beton Nok Bubungan Piramid Cat Air 1x Bh 6,645.00 27. Genteng Beton Nok Bubungan Piramid Cat Air 2x Bh 7,000.00

28. Genteng Beton Kyoto Natural Isi### Bh 6,075.00

29. Genteng Beton Kyoto Cat Air 1x Isi### Bh 4,400.00

30. Genteng Beton Kyoto Cat Air 2x Isi### Bh 5,050.00

X.3.11.2. Genteng Keramik

1. Gent. Krm. Berglazur KM 1 Standard Isi### Bh 9,200.00

UkuranUkuranUkuranUkuranUkuranUkuranUkuranUkuranUkuranUkuran

UkuranUkuranUkuranUkuran

Ukuran

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Bh/M2

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

2. Gent. Krm. Berglazur KM 1 PA (Pemanas Air) Bh 16,200.00 3. Gent. Krm. Berglazur KM 2 Nok Isi,9 Bh/M' Bh 20,600.00 4. Gent. Krm. Berglazur KM 2 PP (Penangkal Petir) Bh 44,000.00 5. Gent. Krm. Berglazur KM 3 (Lisplank Kiri) Bh 17,000.00 6. Gent. Krm. Berglazur KM 4 (Lisplank Kanan) Bh 17,000.00 7. Gent. Krm. Berglazur KM 6 (Ujung Jurai) Bh 60,000.00 8. Gent. Krm. Berglazur KM 7A (Ujung Nok Kanan) Bh 60,000.00 9. Gent. Krm. Berglazur KM 7B (Ujung Nok Kiri) Bh 60,000.00 10. Gent. Krm. Berglazur KM 8A (Nok 3 Arah Kanan) Bh 76,000.00 11. Gent. Krm. Berglazur KM 8A (Nok 3 Arah Kari) Bh 76,000.00 12. Gent. Krm. Berglazur KM 9 + 9A (Hiasan Sudut Jurai) Bh 76,000.00 13. Gent. Krm. Berglazur KM 10 A (Nok 2 Arah) Bh 76,000.00 14. Gent. Krm. Berglazur KM 10 B (Nok 2 Arah Kanan) Bh 76,000.00 15. Gent. Krm. Berglazur KM 10 C (Nok 2 Arah Kiri) Bh 76,000.00 16. Gent. Krm. Berglazur KM 11 (Nok 4 Arah Jurai) Bh 250,000.00

X.3.11.3. Genteng Metal

1. Atap Metal Ukuran 77 100 cm Lbr 155,000.00 2. Atap Metal Ukuran 77 100 cm Lbr 140,000.00 3. Atap Metal Ukuran 38.5 100 cm Lbr 80,000.00 4. Atap Metal Ukuran 38.5 100 cm Lbr 70,000.00 5. Atap Metal Nok model U Ukuran 110 5 x 6 cm Bh 46,000.00 6. Atap Metal Nok model U Ukuran 110 5 x 6 cm Bh 40,000.00 7. Atap Metal Nok Model C Ukuran R. 9 - 9,5 cm x 40 cm Bh 30,000.00 8. Atap Metal Nok Model C Ukuran R. 9 - 9,5 cm x 40 cm Bh 25,000.00 9. Atap Metal Nok samping Ukuran 110 7 x 6 cm Bh 46,000.00 10. Atap Metal Nok samping Ukuran 110 7 x 6 cm Bh 42,000.00 11. Atap Metal Wall Flashing Ukuran 110 10 cm Bh 46,000.00 12. Atap Metal Wall Flashing Ukuran 110 10 cm Bh 42,000.00 13. Atap Metal Tutup Nok Bh 30,000.00 14. Atap Metal Tutup Nok Bh 39,000.00 15. Atap Metal Genteng 4 x 4 Ukuran 154 80 cm Lbr 203,000.00 16. Atap Metal Genteng 4 x 4 Ukuran 154 80 cm Lbr 177,000.00 17. Atap Metal Genteng 3 x 4 Ukuran 116 80 cm Lbr 153,000.00 17. Atap Metal Genteng 3 x 4 Ukuran 116 80 cm Lbr 133,000.00 18. Atap Metal Genteng 2 x 4 Ukuran 77 80 cm Lbr 103,000.00 19. Atap Metal Genteng 2 x 4 Ukuran 77 80 cm Lbr 90,000.00 20. Atap Metal Genteng 1 x 4 Ukuran 38.5 80 cm Lbr 53,000.00 20. Atap Metal Genteng 1 x 4 Ukuran 38.5 80 cm Lbr 46,000.00 21. Atap Metal Nok model U Ukuran 110 5 x 6 cm Bh 46,000.00 22. Atap Metal Nok model U Ukuran 110 5 x 6 cm Bh 40,000.00 23. Atap Metal Nok Model C Ukuran R. 9 - 9,5 cm x 40 cm Bh 61,000.00 24. Atap Metal Nok Model C Ukuran R. 9 - 9,5 cm x 40 cm Bh 81,000.00 25. Atap Metal Nok samping Ukuran 110 7 x 6 cm Bh 90,000.00 26. Atap Metal Nok samping Ukuran 110 7 x 6 cm Bh 31,000.00 27. Atap Metal Wall Flashing Ukuran 110 10 cm Bh 42,000.00 28. Atap Metal Wall Flashing Ukuran 110 10 cm Bh 46,000.00 29. Atap Metal Tutup Nok Bh 33,000.00 30. Atap Metal Tutup Nok Bh 27,000.00 31. Atap Metal Genteng 2 x 4 ( Merpati ) Ukuran 77 80 cm Lbr 21,000.00 32. Atap Metal Genteng 2 x 4 ( Elang ) Ukuran 77 80 cm Lbr 33,000.00 33. Atap Metal Genteng 2 x 4 ( Garuda ) Ukuran 77 80 cm Lbr 46,000.00 34. Atap Metal Genteng 1 x 4 ( Merpati ) Ukuran 38.5 80 cm Lbr 40,000.00 35. Atap Metal Genteng 1 x 4 ( Elang ) Ukuran 38.5 80 cm Lbr 29,000.00 36. Atap Metal Genteng 1 x 4 ( Garuda ) Ukuran 38.5 80 cm Lbr 23,000.00 37. Atap Metal Nok model U Ukuran 110 5 x 6 cm Bh 46,000.00 38. Atap Metal Nok Model C Ukuran R. 9 - 9,5 cm x 40 cm Bh 40,000.00 39. Atap Metal Nok samping Ukuran 110 7 x 6 cm Bh 26,000.00 40. Atap Metal Wall Flashing Ukuran 110 10 cm Bh 30,000.00 41. Atap Metal Tutup Nok Bh 26,000.00

X.3.11.4. Atap Aluminium

1. Atap Aluminium Klip Lok Tebal 0,50 mm TCTColourbond 262,000.00

2. Atap Aluminium Klip Lok Tebal 0,50 mm TCTZincalume 173,000.00

Genteng 2 x 5 ( 1 m2 = 1,3 lb ) xGenteng 2 x 5 ( 1 m2 = 1,3 lb ) xGenteng 1 x 5 ( 1 m2 = 2,6 lb ) xGenteng 1 x 5 ( 1 m2 = 2,6 lb ) x

xx

xxxx

xxxxxxxxxx

xxxx

xxxxxxx

xx

M2

M2

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

3. Atap Aluminium Spandek Tebal 0,45 mm TCTColourbond 215,000.00

4. Atap Aluminium Spandek Tebal 0,45 mm TCTZincalume 138,000.00

5. Atap Aluminium Spandek Tebal 0,40 mm TCTColourbond 199,000.00

6. Atap Aluminium Spandek Tebal 0,40 mm TCTZincalume 125,000.00

7. Atap Aluminium Trimdek Tebal 0,45 mm TCTColourbond 200,000.00

8. Atap Aluminium Trimdek Tebal 0,45 mm TCTZincalume 128,000.00

9. Atap Aluminium Trimdek Tebal 0,40 mm TCTColourbond 183,000.00

10. Atap Aluminium Trimdek Tebal 0,40 mm TCTZincalume 115,000.00

11. Atap Aluminium Klip Lok (Proklip) Tebal 0,50 mm TCTPelangi 237,000.00

12. Atap Aluminium Klip Lok (Proklip) Tebal 0,45 mm TCTPelangi 218,000.00

13. Atap Aluminium Klip Lok (Proklip) Tebal 0,45 mm TCTBare 156,000.00

14. Atap Aluminium Spandek (Indodek) Tebal 0,45 mm TCTPelangi 192,000.00

15. Atap Aluminium Spandek (Indodek) Tebal 0,40 mm TCTPelangi 173,000.00

16. Atap Aluminium Spandek (Indodek) Tebal 0,35 mm TCTPelangi 160,000.00

17. Atap Aluminium Spandek (Indodek) Tebal 0,35 mm TCTZincalume 110,000.00

18. Atap Aluminium Trimdek ( Nusadek ) Tebal 0,45 mm TCTPelangi 180,000.00

19. Atap Aluminium Trimdek ( Nusadek ) Tebal 0,40 mm TCTPelangi 160,000.00

20. Atap Aluminium Trimdek ( Nusadek ) Tebal 0,35 mm TCTPelangi 141,000.00

21. Atap Aluminium Trimdek ( Nusadek ) Tebal 0,35 mm TCTZincalume 103,000.00

22. Atap Aluminium Klip Lok (Bima) Tebal 0,50 mm TCTGemilang 205,000.00

23. Atap Aluminium Klip Lok (Bima) Tebal 0,50 mm TCTAbadi 157,000.00

24. Atap Aluminium Klip Lok (Bima) Tebal 0,45 mm TCTGemilang 188,000.00

25. Atap Aluminium Klip Lok (Bima) Tebal 0,45 mm TCTAbadi 142,000.00

26. Atap Aluminium Spandek (Satria) Tebal 0,45 mm TCTGemilang 166,000.00

27. Atap Aluminium Spandek (Satria) Tebal 0,45 mm TCTAbadi 127,000.00

28. Atap Aluminium Spandek (Satria) Tebal 0,40 mm TCTGemilang 148,000.00

29. Atap Aluminium Spandek (Satria) Tebal 0,40 mm TCTAbadi 114,000.00

30. Atap Aluminium Spandek (Satria) Tebal 0,35 mm TCTGemilang 135,000.00

31. Atap Aluminium Spandek (Satria) Tebal 0,35 mm TCTAbadi 102,000.00

32. Atap Aluminium Trimdek ( Arjuna ) Tebal 0,45 mm TCTGemilang 152,000.00

33. Atap Aluminium Trimdek ( Arjuna ) Tebal 0,45 mm TCTAbadi 119,000.00

34. Atap Aluminium Trimdek ( Arjuna ) Tebal 0,40 mm TCTGemilang 137,000.00

35. Atap Aluminium Trimdek ( Arjuna ) Tebal 0,40 mm TCTAbadi 106,000.00

36. Atap Aluminium Trimdek ( Arjuna ) Tebal 0,35 mm TCTGemilang 125,000.00

37. Atap Aluminium Trimdek ( Arjuna ) Tebal 0,35 mm TCTAbadi 93,000.00

X.3.11.5. Atap Seng

1. Seng Aluminium lebar 45 cm M' 19,000.00 2. Karpet lebar 45 cm M' 7,500.00 3. Seng Aluminium 0,37 x 60 cm Lbr 36,000.00 4. Seng Gelombang Besar BJLS 30 Lbr 100,000.00 5. Seng Gelombang Besar BJLS 20 Lbr 90,000.00 6. Seng Gelombang BJLS 20 KI Lbr 37,500.00 7. Seng Gelombang BJLS 25 KI Lbr 80,000.00 8. Seng Gelombang BJLS 30 Lbr 60,000.00 9. Seng Gelombang BJLS 25 Lbr 55,000.00 10. Seng Gelombang BJLS 20 Lbr 50,000.00 11. Seng Gelombang BJLS 18 Lbr 45,000.00 12. Seng Plat BJLS 20 KI Lbr 54,000.00 13. Seng Plat BJLS 25 KI Lbr 64,000.00 14. Seng Plat BJLS 30 Lbr 48,000.00 15. Seng Plat BJLS 25 Lbr 43,000.00 16. Seng Plat BJLS 20 Lbr 32,000.00 17. Seng Plat BJLS 18 Lbr 27,000.00

X.3.11.6. Bahan Insulation

1. Aluminium Foil SS 810 1.3 x 60 m Roll 310,000.00 2. Aluminium Foil DS 820 1.3 x 60 m Roll 400,000.00

3. Glasswoll Tebal### mm x 1.2 m x 30 m Roll 239,000.00

4. Glasswoll Tebal### mm x 1.2 m x 15 m Roll 239,000.00

5. Glasswoll Tebal### mm x 1.2 m x 30 m Roll 345,000.00

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

D. 16 Kg/M3

D. 16 Kg/M3

D. 24 Kg/M3

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

6. Glasswoll Tebal### mm x 1.2 m x 15 m Roll 345,000.00

7. Glasswoll Tebal### mm x 1.2 m x 30 m Roll 485,000.00

8. Glasswoll Tebal### mm x 1.2 m x 15 m Roll 485,000.00

9. Roofmesh 3315 : 1.8 x 30 m Roll 275,000.00 10. Aluminium Tape Roll 24,000.00 11. Metalizing Tape Roll 7,500.00

12. Rockwoll Slab Tebal### mm x 0.6 m x 1.2 m Roll 12,000.00

13. Rockwoll Slab Tebal### mm x 0.6 m x 1.2 m Roll 23,500.00

14. Rockwoll Slab Tebal### mm x 0.6 m x 1.2 m Roll 16,000.00

15. Rockwoll Slab Tebal### mm x 0.6 m x 1.2 m Roll 33,000.00

16. Rockwoll Slab Tebal### mm x 0.6 m x 1.2 m Roll 22,500.00

17. Rockwoll Slab Tebal### mm x 0.6 m x 1.2 m Roll 44,000.00

18. Rockwoll Slab Tebal### mm x 0.6 m x 1.2 m Roll 29,000.00

19. Rockwoll Slab Tebal### mm x 0.6 m x 1.2 m Roll 55,500.00

20. Rockwoll Blanket Tebal### mm x 0.6 m x 5 m Roll 47,000.00

21. Rockwoll Blanket Tebal### mm x 0.6 m x 5 m Roll 94,000.00

22. Rockwoll Blanket Tebal### mm x 0.6 m x 5 m Roll 66,500.00

23. Rockwoll Blanket Tebal### mm x 0.6 m x 5 m Roll 146,000.00

24. Rockwoll Blanket Tebal### mm x 0.6 m x 5 m Roll 88,000.00

25. Rockwoll Blanket Tebal### mm x 0.6 m x 5 m Roll 178,500.00

26. Rockwoll Blanket Tebal### mm x 0.6 m x 5 m Roll 111,000.00

27. Rockwoll Blanket Tebal### mm x 0.6 m x 5 m Roll 228,500.00

28. Aluminium Foil Lebar 1,25 m Panjang 60 m (Single Side) Lbr 290,000.00 29. Aluminium Foil Lebar 1,25 m Panjang 60 m (Double Side) Lbr 513,000.00

X.3.12. Penggantung & Pengunci

1. Engsel (Nylon) 4" Bh 42,000.00 2. Engsel (Nylon) 3" Bh 36,000.00 3. Engsel Kipas Bh 42,000.00 4. Grendel Bh 21,000.00 5. Grendel Tanam Bh 71,000.00 6. Hak Angin 20 cm Bh 14,000.00 7. Handle 4 " Bh 11,000.00 8. Kunci Pintu Besar 693 LD Set 187,000.00 9. Kunci Pintu Kecil Set 141,000.00 10. Kunci Tanam 2 x Slaag Bh 212,000.00 11. Kunci Tanam Pintu Sorong Bh 247,000.00 12. Kunci Alpha 8000 8000 Set 176,000.00 13. Kunci Pintu Besar Set 212,000.00 14. Kunci Pintu Set 916,000.00 15. WC Cylinder Finishing US3 Bh 105,000.00 16. WC Cylinder Finishing US14 Bh 112,000.00 17. Mortice Lock Bh18. D Cylinder Finishing BRS Bh 138,000.00 19. D Cylinder Finishing BRS Bh 295,000.00

20. Pull Handle Finishing US32D (P.75.64) Pasang 4,573,000.00

21. Pull Handle Finishing US32(P.75.64) Pasang 5,000,000.00

22. Pull Handle Finishing GPD(PR.88.21) Pasang 962,000.00

23. Lever Handle HP.88.01 Pasang 245,000.00

24. Lever Handle HRE.65.03 Pasang 458,000.00

25. Lever Handle HRE.75.01 Pasang 310,000.00

26. Glass Handle GHD0001 D25x200MM Pasang 845,000.00

27. Glass Handle GHD0001 D32x300MM Pasang 1,182,000.00

28. Door Closer RA 71410 - 03 Bh 1,423,000.00 29. Door Closer RA 85510 - 02 Bh 390,000.00

D. 24 Kg/M3

D. 32 Kg/M3

D. 32 Kg/M3

D. 40 Kg/M3

D. 40 Kg/M3

D. 60 Kg/M3

D. 60 Kg/M3

D. 80 Kg/M3

D. 80 Kg/M3

D. 100 Kg/M3

D. 100 Kg/M3

D. 40 Kg/M3

D. 40 Kg/M3

D. 60 Kg/M3

D. 60 Kg/M3

D. 80 Kg/M3

D. 80 Kg/M3

D. 100 Kg/M3

D. 100 Kg/M3

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

30. Floor Hinge 60221 Bh 2,580,000.00 31. Floor Hinge 09584 Komplit Bh 1,737,000.00

32. Engsel St. Steel SEL0007 4x3x2 Pasang 146,000.00

33. Engsel Brass SEL00012 4x3x3.3 US3 Pasang 254,000.00

34. Engsel Pintu Besi 497 US P Pasang 277,000.00

35. Casement Stay CMT75-030" Pasang 309,000.00

36. Casement Stay CMT45-008" Pasang 77,000.00

37. Grendel Tanam 306 6" BRS Bh 184,000.00 38. Grendel Tanam 306 12" BRS Bh 273,000.00 39. Grendel 440 3" US 3 Bh 81,000.00 40. Grendel 440 4" US 3 Bh 94,000.00 41. Grendel WC SKT 741 (Indicator) Bh 128,000.00 42. Security Bolt 5071 + Key BRS Bh 85,000.00 43. Door Viewer 36 - 60 mm US 3 Bh 92,000.00 44. Door Selector RC 75-002 Bh 135,000.00 45. Ramskar 321 US 3 Bh 130,000.00 46. Rambuncis 330 US 3 Bh 374,000.00 47. Spring Knip 75 - 378 US 3 Bh 152,000.00 48. Door Stop 75 - 011 US 3 Bh 149,000.00 49. Door Stop 75 - 011 US 15 Bh 149,000.00 50. Door Stop 75 - 012 US 4 Bh 160,000.00

X.3.13. Perlengkapan Sanitasi

X.3.13.1. Bak Mandi

1. Bak Mandi Abu-abu Uk. 80 x 60 x 60 cm Bh 352,000.00 2. Bak Mandi Terazo Uk. 80 x 60 x 60 cm Bh 296,000.00 3. Bak Mandi Abu-abu Uk. 60 x 60 x 60 cm Bh 212,000.00 4. Bak Mandi Terazo Uk. 60 x 60 x 60 cm Bh 402,000.00 5. Bak Mandi Abu-abu Uk. 60 x 50 x 50 cm Bh 182,000.00 6. Bak Mandi Terazo Uk. 60 x 50 x 50 cm Bh 253,000.00 7. Bak Mandi Abu-abu Uk. 60 x 40 x 40 cm Bh 126,000.00 8. Bak Mandi Terazo Uk. 60 x 40 x 40 cm Bh 169,000.00 9. Bak Mandi Abu-abu Uk. 50 x 50 x 50 cm Bh 148,000.00 10. Bak Mandi Terazo Uk. 50 x 50 x 50 cm Bh 190,000.00

X.3.13.2. Closet

1. Closet Jongkok CE 9 Bh 659,000.00 2. Closet Jongkok CE 7 Bh 600,000.00 3. Closet Jongkok Bh 150,000.00 4. Closet Jongkok Rapi C Squat Bh 40,400.00 5. Closet Jongkok Rapi EX Squat Bh 215,000.00 6. Closet Jongkok Rapi DX Top Spud + Flush Valve Squat TS Bh 2,327,000.00 7. Closet Duduk CW 668 J/SW 668 J Set 4,000,000.00 8. Closet Duduk One Piece Toilet Champion One Piece Toilet Set 6,400,000.00 9. Closet Duduk One Piece Toilet Lexington One Piece Toilet Set 6,603,000.00 10. Closet Duduk One Piece Toilet Hamilton One Piece Toilet Set 5,019,000.00 11. Closet Duduk One Piece Toilet Sanremo Classic One Piece Toilet Set 4,273,000.00 12. Closet Duduk Close Coupled Toilet Granada 3000 CCST Set 2,692,000.00 13. Closet Duduk Close Coupled Toilet Projecta CCST Set 2,514,000.00

X.3.13.3. Kran Air

1. Kran Washtafel Bh 375,000.00 2. Kran bebek Bh 400,000.00 3. Kran Shower Bh 500,000.00 4. Kran air Bh 235,000.00 5. Kran tembok Bh 215,000.00 6. Kran air Wall Tap IN 301C Wall Tap Chrome 1/2" Bh 130,000.00 7. Kran air Wall Tap IN 301A Wall Tap Acrylic 1/2" Bh 130,000.00 8. Kran air Wall Tap IN 26 Garden Wall Tap Chrome 1/2" Bh 150,000.00 9. Kran air Wall Tap IN 24 Double Faucet 2 in 1 W/M Chrome 1/2" Bh 130,000.00

US32D

US32D

US32D

US 32D

US 32D

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

10. Kran air Wall Tap IN 301C Wall Tap Chrome 1/2" Bh 280,000.00

X.3.13.4. Wastafel

1. Wastafel Type LW 650 J/LW 650 FJ Bh 6,242,000.00 2. Wastafel Type LW 501 J Bh 3,345,000.00 3. Wastafel Type L 34 Bh 1,343,000.00 4. Wastafel Type L 529 V1 Bh 1,848,000.00 5. Wastafel Lavatory and PedestSan Remo 55 Bh 2,033,000.00 6. Wastafel Lavatory and PedestNevada Bh 1,926,000.00 7. Wastafel Vanitory Monaco Bh 775,000.00 8. Wastafel Vanitory Rondalyn Bh 559,000.00 9. Wastafel Vanitory Aqualyn Bh 513,000.00 10. Wastafel Wall Hung Lavatory Studio 50 Bh 1,516,000.00 11. Wastafel Wall Hung Lavatory Studio 45 Bh 1,469,000.00 12. Wastafel Wall Hung Lavatory Studio 35 Bh 1,390,000.00

X.3.13.5. Urinal

1. Urinal Top Spud Urinal Washbrook Bh 4,025,000.00 2. Urinal Top Spud Urinal Mini Washbrook Bh 3,072,000.00 3. Urinal Top Spud Urinal Maybrook II Bh 2,570,000.00 4. Urinal Divider Bh 532,000.00

X.3.13.6. Kitchen Sink

1. Kitchen Sink Sink R -1 Ukuran 100 x 56 x 88 cm Bh 1,759,000.00 2. Kitchen Sink Kitchen Set R8 Ukuran 120 x 56 x 88 cm Bh 1,830,000.00 3. Kitchen Sink Elegant R4 Ukuran 133 x 56 x 88 cm Bh 2,000,000.00 4. Kitchen Sink Kitchen Sink R9 Ukuran 116 x 56 x 90 cm Bh 1,900,000.00 5. Kitchen Sink Work Table Ukuran 81 x 43 x 88 cm Bh 320,000.00 6. Kitchen Sink Work Table Ukuran 116 x 63 x 88 cm Bh 960,000.00 7. Kitchen Sink Kitchen Sink Naomi Ukuran 62 x 48 x 75 cm Bh 500,000.00

8. Kitchen Sink Double Kitcken Sink U 105 x 56 x 87 cmdeep 27 cm Bh 960,000.00

9. Kitchen Sink Kitchen Sink SB U 63 x 57 x 76 cmdeep 30 cm Bh 1,037,000.00

X.3.14. Pipa

X.3.14.1. Pipa Besi

1. Pipa Besi ø 1/2" Panjang 4 m Btg 250,000.00 2. Pipa Besi ø 3/4" Panjang 4 m Btg 350,000.00 3. Pipa Besi ø 2" Panjang 4 m Btg 925,000.00

X.3.14.2. Pipa PVC

1. Pipa PVC ø 1/2" Btg 25,000.00 2. Pipa PVC ø 3/4" Btg 40,000.00 3. Pipa PVC ø 1" Btg 45,000.00 4. Pipa PVC ø 1 1/2" Btg 65,000.00 5. Pipa PVC ø 2" Btg 40,000.00 6. Pipa PVC ø 3" Btg 240,000.00 1 Pipa PVC ø 4" Btg 350,000.00 8. Pipa PVC ø 4" Btg 8,223,000.00 9. Pipa PVC ø 16" (400 mm) Btg 42,733,000.00 10. Pipa PVC ø 24" (600 mm) Btg 55,803,000.00

X.3.14.2.1. Pipa PVC Serie 12,5

1. Pipa PVC ø 1" Btg 41,000.00 2. Pipa PVC ø 2" Btg 105,000.00 3. Pipa PVC ø 3" Btg 193,000.00 4. Pipa PVC ø 4" Btg 293,000.00 5. Pipa PVC ø 6" Btg 387,000.00 6. Pipa PVC ø 8" Btg 587,000.00 7. Pipa PVC ø 10" Btg 734,000.00 8. Pipa PVC ø 12" Btg 775,000.00 9. Pipa PVC ø 1/2" Btg 20,000.00 10. Pipa PVC ø 3/4" Btg 28,000.00

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

11. Pipa PVC ø 1" Btg 38,000.00 12. Pipa PVC ø 1 1/4" Btg 58,000.00 13. Pipa PVC ø 1 1/2" Btg 66,000.00 14. Pipa PVC ø 2" Btg 86,000.00 15. Pipa PVC ø 3" Btg 174,000.00 16. Pipa PVC ø 4" Btg 288,000.00 17. Pipa PVC ø 6" Btg 657,000.00 18. Pipa PVC ø 8" Btg 1,123,000.00 19. Pipa PVC ø 10" Btg 1,697,000.00 20. Pipa PVC ø 12" Btg 2,478,000.00 21. Pipa PVC ø 16" Btg 5,093,000.00

X.3.14.2.2. Pipa PVC Type AW

1. Pipa PVC ø 1/2" Panjan 4 m Btg 26,000.00 2. Pipa PVC ø 1/2" Panjan 6 m Btg 31,000.00 3. Pipa PVC ø 3/4" Panjan 4 m Btg 32,000.00 4. Pipa PVC ø 1" Panjan 4 m Btg 36,000.00 5. Pipa PVC ø 1 1/4" Panjan 4 m Btg 45,000.00 6. Pipa PVC ø 1 1/2" Panjan 4 m Btg 59,000.00 7. Pipa PVC ø 2" Panjan 4 m Btg 75,000.00 8. Pipa PVC ø 2 1/2" Panjan 4 m Btg 114,000.00 9. Pipa PVC ø 3" Panjan 4 m Btg 163,000.00 10. Pipa PVC ø 4" Panjan 4 m Btg 237,000.00 11. Pipa PVC ø 5" Panjan 4 m Btg 375,000.00 12. Pipa PVC ø 6" Panjan 4 m Btg 525,000.00 13. Pipa PVC ø 8" Panjan 4 m Btg 900,000.00 14. Pipa PVC ø 10" Panjan 4 m Btg 1,450,000.00 15. Pipa PVC ø 12" Panjan 4 m Btg 1,985,000.00 16. Pipa PVC ø 14" Panjan 4 m Btg 2,207,000.00 17. Pipa PVC ø 16" Panjan 4 m Btg 2,770,000.00 18. Pipa PVC ø 3/4" Panjan 6 m Btg 38,000.00 19. Pipa PVC ø 1" Panjan 6 m Btg 47,000.00 20. Pipa PVC ø 1 1/4" Panjan 6 m Btg 67,000.00 21. Pipa PVC ø 1 1/2" Panjan 6 m Btg 88,000.00 22. Pipa PVC ø 2" Panjan 6 m Btg 132,000.00 23. Pipa PVC ø 2 1/2" Panjan 6 m Btg 170,000.00 24. Pipa PVC ø 3" Panjan 6 m Btg 242,000.00 25. Pipa PVC ø 4" Panjan 6 m Btg 354,000.00 26. Pipa PVC ø 5" Panjan 6 m Btg 557,000.00 27. Pipa PVC ø 6" Panjan 6 m Btg 739,000.00 28. Pipa PVC ø 8" Panjan 6 m Btg 1,148,000.00 29. Pipa PVC ø 10" Panjan 6 m Btg 1,636,000.00 30. Pipa PVC ø 12" Panjan 6 m Btg 2,355,000.00 31. Pipa PVC ø 14" Panjan 6 m Btg 3,285,000.00 32. Pipa PVC ø 16" Panjan 6 m Btg 1,117,000.00

X.3.14.2.3. Pipa PVC Type D

1. Pipa PVC ø 1 1/4" Panjan 4 m Btg 29,000.00 2. Pipa PVC ø 1 1/2" Panjan 4 m Btg 33,000.00 3. Pipa PVC ø 2" Panjan 4 m Btg 42,000.00 4. Pipa PVC ø 2 1/2" Panjan 4 m Btg 62,000.00 5. Pipa PVC ø 3" Panjan 4 m Btg 91,000.00 6. Pipa PVC ø 4" Panjan 4 m Btg 127,000.00 7. Pipa PVC ø 5" Panjan 4 m Btg 210,000.00 8. Pipa PVC ø 6" Panjan 4 m Btg 258,000.00 9. Pipa PVC ø 8" Panjan 4 m Btg 454,000.00 10. Pipa PVC ø 10" Panjan 4 m Btg 792,000.00 11. Pipa PVC ø 12" Panjan 4 m Btg 1,079,000.00 12. Pipa PVC ø 14" Panjan 4 m Btg 1,419,000.00 13. Pipa PVC ø 16" Panjan 4 m Btg 1,838,000.00 14. Pipa PVC ø 1 1/4" Panjan 6 m Btg 42,000.00 15. Pipa PVC ø 1 1/2" Panjan 6 m Btg 47,000.00 16. Pipa PVC ø 2" Panjan 6 m Btg 63,000.00 17. Pipa PVC ø 2 1/2" Panjan 6 m Btg 93,000.00 18. Pipa PVC ø 3" Panjan 6 m Btg 135,000.00

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

19. Pipa PVC ø 4" Panjan 6 m Btg 190,000.00 20. Pipa PVC ø 5" Panjan 6 m Btg 313,000.00 21. Pipa PVC ø 6" Panjan 6 m Btg 383,000.00 22. Pipa PVC ø 8" Panjan 6 m Btg 675,000.00 23. Pipa PVC ø 10" Panjan 6 m Btg 1,177,000.00 24. Pipa PVC ø 12" Panjan 6 m Btg 1,604,000.00 25. Pipa PVC ø 14" Panjan 6 m Btg 2,106,000.00 26. Pipa PVC ø 16" Panjan 6 m Btg 2,728,000.00

X.3.14.2.4. Pipa PVC Type C

1. Pipa PVC ø 5/8" Panjan 4 m Btg 5,000.00 2. Pipa PVC ø 3/4" Panjan 4 m Btg 11,000.00 3. Pipa PVC ø 1" Panjan 4 m Btg 15,000.00 4. Pipa PVC ø 1 1/4" Panjan 4 m Btg 19,000.00 5. Pipa PVC ø 1 1/2" Panjan 4 m Btg 23,000.00 6. Pipa PVC ø 2" Panjan 4 m Btg 36,000.00 7. Pipa PVC ø 2 1/2" Panjan 4 m Btg 47,000.00 8. Pipa PVC ø 3" Panjan 4 m Btg 54,000.00 9. Pipa PVC ø 4" Panjan 4 m Btg 70,000.00 10. Pipa PVC ø 5/8" Panjan 6 m Btg 8,000.00 11. Pipa PVC ø 3/4" Panjan 6 m Btg 15,000.00 12. Pipa PVC ø 1" Panjan 6 m Btg 22,000.00 13. Pipa PVC ø 1 1/4" Panjan 6 m Btg 29,000.00 14. Pipa PVC ø 1 1/2" Panjan 6 m Btg 34,000.00 15. Pipa PVC ø 2" Panjan 6 m Btg 54,000.00 16. Pipa PVC ø 2 1/2" Panjan 6 m Btg 70,000.00 17. Pipa PVC ø 3" Panjan 6 m Btg 81,000.00 18. Pipa PVC ø 4" Panjan 6 m Btg 105,000.00

X.3.14.3. Pipa Galvanis

1. Pipa Galvanis ø 1/2" Btg 252,000.00 2. Pipa Galvanis ø 3/4" Btg 332,000.00 3. Pipa Galvanis ø 1" Btg 481,000.00 4. Pipa Galvanis ø 1 1/2" Btg 685,000.00 5. Pipa Galvanis ø 2" Btg 952,000.00 6. Pipa Galvanis ø 3" Btg 1,720,000.00 7. Pipa Galvanis ø 4" Btg 2,523,000.00 8. Pipa Galvanis ø 6" Btg 3,850,000.00 9. Pipa Galvanis ø 8" Btg 6,500,000.00 10. Pipa Galvanis ø 10" Btg 8,500,000.00 11. Pipa Galvanis ø 12" Btg 14,500,000.00

X.3.14.4. Pipa Air

X.3.14.4.1. Pipa Air BSA

1. Pipa Air ø 1/2" Hitam Btg 175,000.00 2. Pipa Air ø 3/4" Hitam Btg 200,000.00 3. Pipa Air ø 1" Hitam Btg 235,000.00 4. Pipa Air ø 1 1/4" Hitam Btg 285,000.00 5. Pipa Air ø 1 1/2" Hitam Btg 375,000.00 6. Pipa Air ø 2" Hitam Btg 525,000.00 7. Pipa Air ø 2 1/2" Hitam Btg 600,000.00 8. Pipa Air ø 3" Hitam Btg 650,000.00 9. Pipa Air ø 4" Hitam Btg 750,000.00 10. Pipa Air ø 5" Hitam Btg 800,000.00 11. Pipa Air ø 6" Hitam Btg 969,000.00 12. Pipa Air ø 1/2" Air Btg 71,000.00 13. Pipa Air ø 3/4" Air Btg 90,000.00 14. Pipa Air ø 1" Air Btg 123,000.00 15. Pipa Air ø 1 1/4" Air Btg 159,000.00 16. Pipa Air ø 1 1/2" Air Btg 211,000.00 17. Pipa Air ø 2" Air Btg 297,000.00 18. Pipa Air ø 2 1/2" Air Btg 408,000.00 19. Pipa Air ø 3" Air Btg 502,000.00 20. Pipa Air ø 4" Air Btg 666,000.00 21. Pipa Air ø 5" Air Btg 941,000.00

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

22. Pipa Air ø 6" Air Btg 1,141,000.00

X.3.14.4.2. Pipa Air MED II

1. Pipa Air ø 1/2" Hitam Btg 225.00 2. Pipa Air ø 3/4" Hitam Btg 295,000.00 3. Pipa Air ø 1" Hitam Btg 425,000.00 4. Pipa Air ø 1 1/4" Hitam Btg 550,000.00 5. Pipa Air ø 1 1/2" Hitam Btg 650,000.00 6. Pipa Air ø 2" Hitam Btg 895,000.00 7. Pipa Air ø 2 1/2" Hitam Btg 1,100,000.00 8. Pipa Air ø 3" Hitam Btg 1,400,000.00 9. Pipa Air ø 4" Hitam Btg 2,250,000.00 10. Pipa Air ø 5" Hitam Btg 2,750,000.00 11. Pipa Air ø 6" Hitam Btg 3,316,000.00 12. Pipa Air ø 1/2" Air Btg 250,000.00 13. Pipa Air ø 3/4" Air Btg 295,000.00 14. Pipa Air ø 1" Air Btg 450,000.00 15. Pipa Air ø 1 1/4" Air Btg 585,000.00 16. Pipa Air ø 1 1/2" Air Btg 685,000.00 17. Pipa Air ø 2" Air Btg 925,000.00 18. Pipa Air ø 2 1/2" Air Btg 1,100,000.00 19. Pipa Air ø 3" Air Btg 1,600,000.00 20. Pipa Air ø 4" Air Btg 2,500,000.00 21. Pipa Air ø 5" Air Btg 2,975,000.00 22. Pipa Air ø 6" Air Btg 3,850,000.00

X.3.14.4.3. Pipa Air SCH-40 ASTM A-53 Gr A

1. Pipa Air ø 1/2" Hitam Btg 174,000.00 2. Pipa Air ø 3/4" Hitam Btg 240,000.00 3. Pipa Air ø 1" Hitam Btg 348,000.00 4. Pipa Air ø 1 1/4" Hitam Btg 450,000.00 5. Pipa Air ø 1 1/2" Hitam Btg 510,000.00 6. Pipa Air ø 2" Hitam Btg 714,000.00 7. Pipa Air ø 2 1/2" Hitam Btg 1,140,000.00 8. Pipa Air ø 3" Hitam Btg 1,560,000.00 9. Pipa Air ø 4" Hitam Btg 2,280,000.00 10. Pipa Air ø 5" Hitam Btg 3,000,000.00 11. Pipa Air ø 6" Hitam Btg 3,780,000.00 12. Pipa Air ø 8" Hitam Btg 5,700,000.00 13. Pipa Air ø 1/2" Air Btg 420,000.00 14. Pipa Air ø 3/4" Air Btg 462,000.00 15. Pipa Air ø 1" Air Btg 582,000.00 16. Pipa Air ø 1 1/4" Air Btg 660,000.00 17. Pipa Air ø 1 1/2" Air Btg 900,000.00 18. Pipa Air ø 2" Air Btg 1,170,000.00 19. Pipa Air ø 2 1/2" Air Btg 1,656,000.00 20. Pipa Air ø 3" Air Btg 2,340,000.00 21. Pipa Air ø 4" Air Btg 3,300,000.00 22. Pipa Air ø 5" Air Btg 3,600,000.00 23. Pipa Air ø 6" Air Btg 4,740,000.00 24. Pipa Air ø 8" Air Btg 7,800,000.00

X.3.14.4.4. Pipa Air BSA/Med B

1. Pipa Air ø 1/2" Hitam Btg 89,000.00 2. Pipa Air ø 3/4" Hitam Btg 97,000.00 3. Pipa Air ø 1" Hitam Btg 136,000.00 4. Pipa Air ø 1 1/4" Hitam Btg 174,000.00 5. Pipa Air ø 1 1/2" Hitam Btg 224,000.00 6. Pipa Air ø 2" Hitam Btg 305,000.00 7. Pipa Air ø 2 1/2" Hitam Btg 422,000.00 8. Pipa Air ø 3" Hitam Btg 497,000.00 9. Pipa Air ø 4" Hitam Btg 704,000.00 10. Pipa Air ø 5" Hitam Btg 993,000.00 11. Pipa Air ø 6" Hitam Btg 1,183,000.00 12. Pipa Air ø 8" Hitam Btg 2,242,000.00

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

13. Pipa Air ø 1/2" Air Btg 89,000.00 14. Pipa Air ø 3/4" Air Btg 114,000.00 15. Pipa Air ø 1" Air Btg 161,000.00 16. Pipa Air ø 1 1/4" Air Btg 218,000.00 17. Pipa Air ø 1 1/2" Air Btg 266,000.00 18. Pipa Air ø 2" Air Btg 361,000.00 19. Pipa Air ø 2 1/2" Air Btg 497,000.00 20. Pipa Air ø 3" Air Btg 584,000.00 21. Pipa Air ø 4" Air Btg 830,000.00 22. Pipa Air ø 5" Air Btg 1,171,000.00 23. Pipa Air ø 6" Air Btg 1,395,000.00 24. Pipa Air ø 8" Air Btg 2,645,000.00

X.3.14.4.5. Pipa Air MED SNI

1. Pipa Air ø 1/2" Hitam Btg 150,000.00 2. Pipa Air ø 3/4" Hitam Btg 180,000.00 3. Pipa Air ø 1" Hitam Btg 270,000.00 4. Pipa Air ø 1 1/4" Hitam Btg 348,000.00 5. Pipa Air ø 1 1/2" Hitam Btg 456,000.00 6. Pipa Air ø 2" Hitam Btg 510,000.00 7. Pipa Air ø 2 1/2" Hitam Btg 600,000.00 8. Pipa Air ø 3" Hitam Btg 1,020,000.00 9. Pipa Air ø 4" Hitam Btg 1,380,000.00 10. Pipa Air ø 5" Hitam Btg 1,680,000.00 11. Pipa Air ø 6" Hitam Btg 2,160,000.00 12. Pipa Air ø 8" Hitam Btg 4,500,000.00 13. Pipa Air ø 1/2" Air Btg 180,000.00 14. Pipa Air ø 3/4" Air Btg 234,000.00 15. Pipa Air ø 1" Air Btg 354,000.00 16. Pipa Air ø 1 1/4" Air Btg 450,000.00 17. Pipa Air ø 1 1/2" Air Btg 522,000.00 18. Pipa Air ø 2" Air Btg 720,000.00 19. Pipa Air ø 2 1/2" Air Btg 1,080,000.00 20. Pipa Air ø 3" Air Btg 1,320,000.00 21. Pipa Air ø 4" Air Btg 1,800,000.00 22. Pipa Air ø 5" Air Btg 2,280,000.00 23. Pipa Air ø 6" Air Btg 2,820,000.00 24. Pipa Air ø 8" Air Btg 5,640,000.00

X.3.14.4.6. Pipa Air SCH 20 ASTM A - 53 A

1. Pipa Air ø 2" Hitam Btg 413,000.00 2. Pipa Air ø 2 1/2" Hitam Btg 715,000.00 3. Pipa Air ø 3" Hitam Btg 841,000.00 4. Pipa Air ø 4" Hitam Btg 1,190,000.00 5. Pipa Air ø 5" Hitam Btg 1,519,000.00 6. Pipa Air ø 6" Hitam Btg 1,949,000.00 7. Pipa Air ø 8" Hitam Btg 2,968,000.00 8. Pipa Air ø 10" Hitam Btg 4,057,000.00 9. Pipa Air ø 12" Hitam Btg 4,842,000.00 10. Pipa Air ø 2" Air Btg 487,000.00 11. Pipa Air ø 2 1/2" Air Btg 843,000.00 12. Pipa Air ø 3" Air Btg 993,000.00 13. Pipa Air ø 4" Air Btg 1,403,000.00 14. Pipa Air ø 5" Air Btg 1,792,000.00 15. Pipa Air ø 6" Air Btg 2,289,000.00 16. Pipa Air ø 8" Air Btg 3,501,000.00 17. Pipa Air ø 10" Air Btg 5,274,000.00 18. Pipa Air ø 12" Air Btg 6,294,000.00 19.

X.3.14.5. Sambungan Pipa Air

X.3.14.5.1. Bend 90

1. Pipa ø 1/2" Bh 5,500.00 2. Pipa ø 3/4" Bh 8,000.00 3. Pipa ø 1" Bh 11,500.00 4. Pipa ø 1 1/4" Bh 18,000.00

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

5. Pipa ø 1 1/2" Bh 22,500.00 6. Pipa ø 2" Bh 37,500.00 7. Pipa ø 2 1/2" Bh 70,000.00 8. Pipa ø 3" Bh 115,000.00 9. Pipa ø 4" Bh 187,500.00 10. Pipa ø 6" Bh 750,000.00

X.3.14.5.2. Bushing

1. Bushing ø 3/4" Bh 5,500.00 2. Bushing ø 1" Bh 8,000.00 3. Bushing ø 1 1/4" Bh 11,500.00 4. Bushing ø 1 1/2" Bh 18,000.00 5. Bushing ø 2" Bh 22,500.00 6. Bushing ø 2 1/2" Bh 37,500.00 7. Bushing ø 3" Bh 70,000.00 8. Bushing ø 4" Bh 115,000.00 9. Bushing ø 5" Bh 187,500.00 10. Bushing ø 6" Bh 750,000.00

X.3.14.5.3. Cap

1. Cap ø 1/2" Bh 4,500.00 2. Cap ø 3/4" Bh 5,500.00 3. Cap ø 1" Bh 7,500.00 4. Cap ø 1 1/4" Bh 11,000.00 5. Cap ø 1 1/2" Bh 15,000.00 6. Cap ø 2" Bh 21,000.00 7. Cap ø 2 1/2" Bh 425,000.00 8. Cap ø 3" Bh 60,000.00 9. Cap ø 4" Bh 97,500.00 10. Cap ø 5" Bh 250,000.00 11. Cap ø 6" Bh 325,000.00

X.3.14.5.4. Cross

1. Cross ø 1/2" Bh 22,500.00 2. Cross ø 3/4" Bh 27,500.00 3. Cross ø 1" Bh 35,000.00 4. Cross ø 1 1/4" Bh 50,000.00 5. Cross ø 1 1/2" Bh 65,000.00 6. Cross ø 2" Bh 85,000.00 7. Cross ø 2 1/2" Bh 165,000.00 8. Cross ø 3" Bh 225,000.00

X.3.14.5.5. Elbow 45

1. Elbow 45 ø 1/2" Bh 7,500.00 2. Elbow 45 ø 3/4" Bh 10,000.00 3. Elbow 45 ø 1" Bh 15,000.00 4. Elbow 45 ø 1 1/4" Bh 22,500.00 5. Elbow 45 ø 1 1/2" Bh 30,000.00 6. Elbow 45 ø 2" Bh 40,000.00 7. Elbow 45 ø 2 1/2" Bh 85,000.00 8. Elbow 45 ø 3" Bh 125,000.00 9. Elbow 45 ø 4" Bh 235,000.00 10. Elbow 45 ø 5" Bh 550,000.00 11. Elbow 45 ø 6" Bh 750,000.00

X.3.14.5.6. Elbow 90

1. Elbow 90 ø 1/2" Bh 3,000.00 2. Elbow 90 ø 3/4" Bh 6,000.00 3. Elbow 90 ø 1" Bh 6,000.00 4. Elbow 90 ø 1 1/4" Bh 9,000.00 5. Elbow 90 ø 1 1/2" Bh 12,000.00 6. Elbow 90 ø 2" Bh 19,000.00 7. Elbow 90 ø 2 1/2" Bh 39,000.00 8. Elbow 90 ø 3" Bh 59,000.00 9. Elbow 90 ø 4" Bh 105,000.00

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

10. Elbow 90 ø 5" Bh 363,000.00 11. Elbow 90 ø 6" Bh 422,000.00

X.3.14.5.7. Look Nut

1. Look Nut ø 1/2" Bh 1,000.00 2. Look Nut ø 3/4" Bh 1,000.00 3. Look Nut ø 1" Bh 2,000.00 4. Look Nut ø 1 1/4" Bh 2,000.00 5. Look Nut ø 1 1/2" Bh 3,000.00 6. Look Nut ø 2" Bh 5,000.00 7. Look Nut ø 2 1/2" Bh 10,000.00 8. Look Nut ø 3" Bh 15,000.00 9. Look Nut ø 4" Bh 30,000.00 10. Look Nut ø 5" Bh 47,000.00

X.3.14.5.8. Nipple

1. Nipple ø 1/2" Bh 5,000.00 2. Nipple ø 3/4" Bh 6,000.00 3. Nipple ø 1" Bh 9,500.00 4. Nipple ø 1 1/4" Bh 13,500.00 5. Nipple ø 1 1/2" Bh 18,500.00 6. Nipple ø 2" Bh 27,500.00 7. Nipple ø 2 1/2" Bh 45,000.00 8. Nipple ø 3" Bh 75,000.00 9. Nipple ø 4" Bh 125,000.00 10. Nipple ø 5" Bh 275,000.00 11. Nipple ø 6" Bh 450,000.00

X.3.14.5.9. Elbow PVC

1. Elbow PVC ø 2" - 9 Bh 54,000.00 2. Elbow PVC ø 2" - 45 Bh 58,000.00 3. Elbow PVC ø 3" - 11,25 Bh 51,000.00 4. Elbow PVC ø 3" - 22,5 Bh 61,000.00 5. Elbow PVC ø 3" - 45 Bh 66,000.00 6. Elbow PVC ø 3" - 90 Bh 115,000.00 7. Elbow PVC ø 4" - 22,5 Bh 132,000.00 8. Elbow PVC ø 6" - 11,25 Bh 293,000.00 9. Elbow PVC ø 6" - 22,5 Bh 278,000.00 10. Elbow PVC ø 6" - 45 Bh 330,000.00 11. Elbow PVC ø 12" - 45 Bh 954,000.00 12. Elbow PVC ø 1/2" 90 DGR Bh 3,000.00 13. Elbow PVC ø 3/4" 90 DGR Bh 3,000.00 14. Elbow PVC ø 1" 90 DGR Bh 4,000.00 15. Elbow PVC ø 1 1/2" 90 DGR Bh 11,000.00

X.3.14.5.10. Blind Flend

1. Blind Flend ø 2" Bh 321,000.00 2. Blind Flend ø 3" Bh 348,000.00 3. Blind Flend ø 4" Bh 458,000.00 4. Blind Flend ø 6" Bh 825,000.00 5. Blind Flend ø 8" Bh 1,376,000.00 6. Blind Flend ø 10" Bh 1,605,000.00 7. Blind Flend ø 12" Bh 1,651,000.00 8. Blind Flend ø 14" (350 mm) Bh 2,064,000.00 9. Blind Flend ø 16" (400 mm) Bh 2,753,000.00 10. Blind Flend ø 18" (450 mm) Bh 3,441,000.00 11. Blind Flend ø 20" (500 mm) Bh 3,212,000.00 12. Blind Flend ø 24" (600 mm) Bh 3,304,000.00

X.3.14.5.11. Gate Valve

1. Gate Valve ø 2" Bh 3,750,000.00 2. Gate Valve ø 3" Bh 5,850,000.00 3. Gate Valve ø 4" Bh 6,750,000.00 4. Gate Valve ø 6" Bh 9,000,000.00 5. Gate Valve ø 12" Bh 18,000,000.00

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

6. Gate Valve ø 8" Bh 7,709,000.00 7. Gate Valve ø 12" Bh 9,750,000.00 8. Gate Valve ø 2" Bh 1,945,000.00 9. Gate Valve ø 3" Bh 2,055,000.00 10. Gate Valve ø 6" Bh 7,636,000.00

X.3.14.5.12. Tee PVC

1. Tee PVC Ukuran 63 x 63 x 63 mm Bh 249,000.00 2. Tee PVC Ukuran 90 x 90 x 90 mm Bh 337,000.00 3. Tee PVC Ukuran 90 x 63 x 90 mm Bh 308,000.00 4. Tee PVC Ukuran 110 x 10 x 110 mm Bh 396,000.00 5. Tee PVC Ukuran 110 x 90 x 110 mm Bh 367,000.00 6. Tee PVC Ukuran 110 x 63 x 110 mm Bh 367,000.00 7. Tee PVC Ukuran 160 x 160 x 160 mm Bh 866,000.00 8. Tee PVC Ukuran 160 x 110 x 160 mm Bh 785,000.00 9. Tee PVC Ukuran 160 x 90 x 160 mm Bh 895,000.00

X.3.14.5.13 Repair Socket PVC

1. Repair Socket PVC ø 2" Bh 26,000.00 2. Repair Socket PVC ø 3" Bh 39,000.00 3. Repair Socket PVC ø 4" Bh 55,000.00 4. Repair Socket PVC ø 6" Bh 110,000.00 5. Repair Socket PVC ø 8" Bh 183,000.00 6. Repair Socket PVC ø 10" Bh 277,000.00 7. Repair Socket PVC ø 12" Bh 477,000.00

X.3.14.5.14. DOP PVC

1. DOP PVC ø 2" Bh 27,000.00 2. DOP PVC ø 3" Bh 51,000.00 3. DOP PVC ø 4" Bh 99,000.00 4. DOP PVC ø 6" Bh 151,000.00

X.3.14.5.15. Long Bend Socket

1. Long Bend Socket ø 2" x 11 Bh 25,000.00 2. Long Bend Socket ø 3" x 11 Bh 58,000.00 3. Long Bend Socket ø 4" x 11 Bh 80,000.00 4. Long Bend Socket ø 6" x 11 Bh 220,000.00 5. Long Bend Socket ø 8" x 11 Bh 367,000.00 6. Long Bend Socket ø 10" x 11 Bh 660,000.00 7. Long Bend Socket ø 12" x 11 Bh 1,079,000.00 8. Long Bend Socket ø 2" x 22 Bh 29,000.00 9. Long Bend Socket ø 3" x 22 Bh 55,000.00 10. Long Bend Socket ø 4" x 22 Bh 88,000.00 11. Long Bend Socket ø 6" x 22 Bh 256,000.00 12. Long Bend Socket ø 8" x 22 Bh 440,000.00 13. Long Bend Socket ø 10" x 22 Bh 756,000.00 14. Long Bend Socket ø 2" x 45 Bh 29,000.00 15. Long Bend Socket ø 3" x 45 Bh 66,000.00 16. Long Bend Socket ø 4" x 45 Bh 110,000.00 17. Long Bend Socket ø 6" x 45 Bh 305,000.00 18. Long Bend Socket ø 8" x 45 Bh 521,000.00 19. Long Bend Socket ø 10" x 45 Bh 954,000.00 20. Long Bend Socket ø 2" x 90 Bh 36,000.00 21. Long Bend Socket ø 3" x 90 Bh 80,000.00 22. Long Bend Socket ø 4" x 90 Bh 146,000.00 23. Long Bend Socket ø 6" x 90 Bh 359,000.00 24. Long Bend Socket ø 8" x 90 Bh 748,000.00 25. Long Bend Socket ø 10" x 22 Bh 1,350,000.00

X.3.14.5.16 Flend Sock PVC

1. Flend Sock PVC ø 2" Bh 132,000.00 2. Flend Sock PVC ø 3" Bh 183,000.00 3. Flend Sock PVC ø 6" Bh 462,000.00 4. Flend Sock PVC ø 8" Bh 595,000.00

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

X.3.14.5.17. Street Elbow

1. Street Elbow ø 1/2" Bh 9,000.00 2. Street Elbow ø 3/4" Bh 23,000.00 3. Street Elbow ø 1" Bh 23,000.00 4. Street Elbow ø 1 1/4" Bh 33,000.00 5. Street Elbow ø 1 1/2" Bh 39,000.00 6. Street Elbow ø 2" Bh 59,000.00 7. Street Elbow ø 2 1/2" Bh 125,000.00

X.3.14.5.18. Plug

1. Plug ø 1/2" Bh 2,000.00 2. Plug ø 3/4" Bh 3,000.00 3. Plug ø 1" Bh 5,000.00 4. Plug ø 1 1/4" Bh 6,000.00 5. Plug ø 1 1/2" Bh 7,000.00 6. Plug ø 2" Bh 9,000.00 7. Plug ø 2 1/2" Bh 19,000.00 8. Plug ø 3" Bh 26,000.00 9. Plug ø 4" Bh 46,000.00 10. Plug ø 5" Bh 125,000.00 11. Plug ø 6" Bh 165,000.00

X.3.14.5.19. Red Elbow

1. Red Elbow ø 3/4" Bh 9,000.00 2. Red Elbow ø 1" Bh 12,000.00 3. Red Elbow ø 1 1/4" Bh 23,000.00 4. Red Elbow ø 1 1/2" Bh 26,000.00 5. Red Elbow ø 2" Bh 36,000.00

X.3.14.5.20. Red Nipple

1. Red Nipple ø 3/4" Bh 6,000.00 2. Red Nipple ø 1" Bh 9,000.00 3. Red Nipple ø 1 1/4" Bh 13,000.00 4. Red Nipple ø 1 1/2" Bh 29,000.00 5. Red Nipple ø 2" Bh 36,000.00

X.3.14.5.21. Red Sock

1. Red Sock ø 3/4" Bh 4,000.00 2. Red Sock ø 1" Bh 5,000.00 3. Red Sock ø 1 1/4" Bh 8,000.00 4. Red Sock ø 1 1/2" Bh 10,000.00 5. Red Sock ø 2" Bh 16,000.00 6. Red Sock ø 2 1/2" Bh 36,000.00 7. Red Sock ø 3" Bh 46,000.00 8. Red Sock ø 4" Bh 99,000.00 9. Red Sock ø 5" Bh 178,000.00 10. Red Sock ø 6" Bh 244,000.00

X.3.14.5.22. Red Tee

1. Red Tee ø 3/4" Bh 9,000.00 2. Red Tee ø 1" Bh 13,000.00 3. Red Tee ø 1 1/4" Bh 23,000.00 4. Red Tee ø 1 1/2" Bh 33,000.00 5. Red Tee ø 2" Bh 46,000.00 6. Red Tee ø 2 1/2" Bh 79,000.00 7. Red Tee ø 3" Bh 125,000.00 8. Red Tee ø 4" Bh 283,000.00 9. Red Tee ø 5" Bh 429,000.00 10. Red Tee ø 6" Bh 686,000.00

X.3.14.5.23 Round Flens

1. Round Flens ø 1/2" Bh 6,000.00 2. Round Flens ø 3/4" Bh 9,000.00 3. Round Flens ø 1" Bh 11,000.00 4. Round Flens ø 1 1/4" Bh 15,000.00

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

5. Round Flens ø 1 1/2" Bh 18,000.00 6. Round Flens ø 2" Bh 22,000.00 7. Round Flens ø 2 1/2" Bh 36,000.00 8. Round Flens ø 3" Bh 47,000.00 9. Round Flens ø 4" Bh 72,000.00 10. Round Flens ø 5" Bh 118,000.00 11. Round Flens ø 6" Bh 132,000.00

X.3.14.5.24. Sock

1. Sock ø 1/2" Bh 2,000.00 2. Sock ø 3/4" Bh 3,000.00 3. Sock ø 1" Bh 5,000.00 4. Sock ø 1 1/4" Bh 7,000.00 5. Sock ø 1 1/2" Bh 9,000.00 6. Sock ø 2" Bh 13,000.00 7. Sock ø 2 1/2" Bh 26,000.00 8. Sock ø 3" Bh 46,000.00 9. Sock ø 4" Bh 66,000.00 10. Sock ø 5" Bh 165,000.00 11. Sock ø 6" Bh 257,000.00

X.3.14.5.25. Tee

1. Tee ø 1/2" Bh 4,000.00 2. Tee ø 3/4" Bh 5,000.00 3. Tee ø 1" Bh 9,000.00 4. Tee ø 1 1/4" Bh 12,000.00 5. Tee ø 1 1/2" Bh 16,000.00 6. Tee ø 2" Bh 36,000.00 7. Tee ø 2 1/2" Bh 62,000.00 8. Tee ø 3" Bh 79,000.00 9. Tee ø 4" Bh 132,000.00 10. Tee ø 5" Bh 363,000.00 11. Tee ø 6" Bh 495,000.00

X.3.14.5.26. Union

1. Union ø 1/2" Bh 12,000.00 2. Union ø 3/4" Bh 16,000.00 3. Union ø 1" Bh 19,000.00 4. Union ø 1 1/4" Bh 26,000.00 5. Union ø 1 1/2" Bh 33,000.00 6. Union ø 2" Bh 52,000.00 7. Union ø 2 1/2" Bh 79,000.00 8. Union ø 3" Bh 132,000.00 9. Union ø 6" Bh 627,000.00

X.3.14.6. Lem

1. Lem PVC Kecil 1/2 Kg Klg 36,000.00 2. Lem PVC Kecil 1/4 Kg (2 ons) Klg 13,000.00 3. Lem PVC Klg 51,000.00 4. Seltif TBA Bh 3,000.00 5. Seltif Bh 3,000.00

X.3.14.7. Instalasi Air

1. Bak Pengaman Meter Air Bh 95,000.00 2. Water Meter 1/2" Linflow Bh 244,000.00 3. Water Meter 2" PAM Bh 7,342,000.00 4. Water Meter 3" PAM Bh 7,782,000.00 5. Water Meter 4" PAM Bh 8,076,000.00

X.3.15. Buish Beton/Gorong-gorong

1. Bulat Pasir Putih Samboja f 100 x 50 cm Bh 211,200.00 2. Bulat Pasir Putih Samboja f 80 x 50 cm Bh 209,100.00 3. Bulat Pasir Putih Samboja f 60 x 50 cm Bh 104,600.00 4. Bulat Pasir Putih Samboja f 50 x 100 cm Bh 153,600.00

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

No Nama Barang Ukuran/Tipe Sat. Harga (Rp)

5. Bulat Pasir Putih Samboja f 40 x 100 cm Bh 89,600.00 6. Bulat Pasir Putih Samboja f 30 x 100 cm Bh 76,800.00 7. Bulat Pasir Putih Samboja f 20 x 100 cm Bh 32,000.00 8. Belahan Pasir Putih Samboja f 100 x 50 cm Bh 105,600.00 9. Belahan Pasir Putih Samboja f 80 x 50 cm Bh 89,600.00 10. Belahan Pasir Putih Samboja f 60 x 50 cm Bh 44,800.00 11. Belahan Pasir Putih Samboja f 50 x 100 cm Bh 76,800.00 12. Belahan Pasir Putih Samboja f 40 x 100 cm Bh 44,800.00 13. Belahan Pasir Putih Samboja f 30 x 100 cm Bh 38,400.00 14. Belahan Pasir Putih Samboja f 20 x 100 cm Bh 146,000.00 15. Bulat Cor Besi Pasir Putih Samboja f 60 x 50 cm Bh 192,000.00 16. Bulat Cor Besi Pasir Putih Samboja f 80 x 50 cm Bh 352,000.00 17. Bulat Cor Besi Pasir Putih Samboja f 100 x 50 cm Bh 448,000.00 18. Belahan Cor Non Besi Pasir Putih Samboja f 60 x 50 cm Bh 108,800.00 19. Belahan Cor Non Besi Pasir Putih Samboja f 80 x 50 cm Bh 256,000.00 20. Belahan Cor Non Besi Pasir Putih Samboja f 100 x 50 cm Bh 371,200.00

X.3.16. Aspal

1. Aspal Kg 12,350.00

X.3.17. Bahan Bakar

1. Minyak Bensin/Premium Liter 6,888.00 2. Minyak Diessel/solar Liter 10,200.00 3. Minyak Pelumas Liter 35,000.00 4. Minyak Tanah Liter 10,000.00 5. Minyak Aspal/Kerosine Liter 10,000.00

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

HARGA BAHAN BANGUNAN

Merk

Malang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang Indah

TonasaTiga RodaBosowa

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

HolcimGresikRed Bull

EsabEsabEsab

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Untuk Genteng Metal

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

KembangEf TaliteEf Talite

Jotun

ParagonParagonParagonParagonParagonParagonJotunJotunJotunJotunJotunJotunJotunJotunJotunJotunJotunJotunJotunJotunJotunJotunJotunJotunJotunPropanPropanPropanPropanPropanPropanICI DuluxICI DuluxICI DuluxVinilexKomilexMowilexCatylac

PropanPropanPropanSikaSikaSikaSikaSikaSika

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

SikaSikaJotunJotunJotunJotunJotunJotunJotun

JotunJotunJotunJotunJotunJotunJotunJotunPropanPropanPropanPropanPropanPropanPropanPropanPropanPropanKimekKimekKimekKimekKimekPlatonPlatonPlatonPlatonPlatonPlatonPlatonPlaton

PropanPropan

PropanPropanPropanPropanPropanPropanPropanPropanPropanPropanPropanPropanPropanPropanPropanPropanPropan

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Ftalit

Asahimas

Asahimas

Asahimas

Asahimas

Asahimas

Asahimas

Asahimas

Asahimas

Asahimas

Knauf

Knauf

Knauf

Knauf

Knauf

Knauf

Knauf

Knauf

Knauf

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Alusingen

Alcotex

Alcopla

Alcopla

Alcopla

Alcotex

Tribond

NitoboNitobo

GranitoGranitoEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaGranitoGranitoGranitoGranitoGranitoGranitoEssenza

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

EssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaGranitoGranitoGranitoGranitoGranitoSejatiSejatiSejatiSejatiSejatiEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaEssenzaGranitoGranitoGranitoGranitoGranito

KiaKiaAsiaAsiaIkadMuliaKiaKiaKiaIkadKiaKiaKiaKiaKiaLacasaLacasaLacasaLacasaLacasaAsiaAsiaAsiaAsiaAsia

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

AsiaAsiaLacasaKiaMuliaIkadKiaKiaPlatinumPlatinumPlatinumPlatinumPlatinumPlatinumPlatinumPlatinumMuliaAsiaMilanMilanSupermilanSupermilanHerculesHerculesHerculesKiaKia

Elegance

Oasis

Ona

Ona

Ona

Tamarin

Gracewood

Gracewood

Gracewood

Gracewood

Gracewood

Gracewood

Gracewood

Gracewood

Gracewood

Gracewood

Gracewood

Gracewood

Gracewood

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Gracewood

Gracewood

Gracewood

Gracewood

Gracewood

Gracewood

Hornitex

(Ex Jerman)

Hornitex

Ipokett

Tarawood

Tarawood

GracewoodHornitex

Hornitex

(Ex Jerman)

Hornitex

(Ex Jerman)GracewoodGracewoodGracewoodGracewoodHornitex Hornitex Hornitex Hornitex Hornitex Hornitex Hornitex Hornitex Hornitex Hornitex Hornitex

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Malang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang Indah

Malang IndahMalang IndahMalang IndahMalang Indah

Maspion

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang Indah

Malang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang Indah

Malang Indah

Malang Indah

Malang Indah

Kanmuri

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

KanmuriKanmuriKanmuriKanmuriKanmuriKanmuriKanmuriKanmuriKanmuriKanmuriKanmuriKanmuriKanmuriKanmuriKanmuri

Multi RoofMulti ColorMulti RoofMulti ColorMulti RoofMulti ColorMulti RoofMulti ColorMulti RoofMulti ColorMulti RoofMulti ColorMulti RoofMulti ColorSurya RoofSurya ColorSurya RoofSurya ColorSurya RoofSurya ColorSurya RoofSurya ColorSurya RoofSurya ColorSurya RoofSurya ColorSurya RoofSurya ColorSurya RoofSurya ColorSurya RoofSurya ColorSakura RoofSakura RoofSakura RoofSakura RoofSakura RoofSakura RoofSakura RoofSakura RoofSurya RoofSurya ColorSurya Roof

Lysaght

Lysaght

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Lysaght

Lysaght

Lysaght

Lysaght

Lysaght

Lysaght

Lysaght

Lysaght

Kharisma

Kharisma

Kharisma

Kharisma

Kharisma

Kharisma

Kharisma

Kharisma

Kharisma

Kharisma

Kharisma

Persada

Persada

Persada

Persada

Persada

Persada

Persada

Persada

Persada

Persada

Persada

Persada

Persada

Persada

Persada

Persada

PolyfoilPolyfoil

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

TalentaSamson

AB FoilAB Foil

MortiseTop Union

AlphaYaleFadexKendKendCisaKendCisa

Kend

Kend

Kend

Kend

Kend

Kend

Kend

Kend

CisaKend

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

CisaKend

Kend

Kend

Kend

Kend

Kend

KendKendKendKendKendKendKendKendKendKendKendKendKendKend

Malang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang Indah

TotoTotoDutyAmstadAmstadAmstadTotoAmstadAmstadAmstadAmstadAmstadAmstad

TotoTotoTotoSan EiTotoAmstadAmstadAmstadAmstad

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Amstad

TotoTotoTotoTotoAmstadAmstadAmstadAmstadAmstadAmstadAmstadAmstad

AmstadAmstadAmstadAmstad

StandartTopRoyalAbsoluteRoyalRoyalRoyal

Royal

Royal

Butterfly KVButterfly KVButterfly KV

RubberingRubberingRubberingRubberingRubberingRubberingRubberingRubberingWavinWavin

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

WavinWavinWavinWavinWavinWavinWavinWavinWavinWavinWavin

SupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralon

SupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralon

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

SupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralon

SupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralonSupralon

SpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindo

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Spindo

SpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindo

SpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindo

SpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindo

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

SpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindo

SpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindo

SpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindoSpindo

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

RR/SIIRR/SIIRR/SIIRR/SIIRR/SIIRR/SIIRR/SIIRR/SIIRR/SIIRR/SIIRR/SIIWavinWavinWavinWavin

10 K10 K10 K10 K10 K10 K10 K10 K10 K10 K10 K10 K

KitzKitzKitzKitzKitz

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

HEHEBlark BoxBlark BoxBlark Box

RubberingRubberingRubberingRubberingRubberingRubberingRubberingRubberingRubbering

RubberingRubberingRubberingRubberingRubberingRubberingRubbering

RubberingRubberingRubberingRubbering

Spigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RRSpigot RR

SII RRSII RRSII RRSII RR

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Malang IndahMalang IndahMalang IndahMalang Indah

Keterangan :Harga satuan diatas belum termasuk pajak-pajak sesuai dengan peraturan yang berlaku

Merk

Malang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang IndahMalang Indah

UPAH TENAGA KERJA

NO Uraian Upah Kerja (Rp.) Keterangan

1 Buruh Tidak Terampil 60,000.00 1 hari = 7 jam kerja2 Buruh Terampil/Pekerja 75,000.00 1 hari = 7 jam kerja3 Tukang Kayu 80,000.00 1 hari = 7 jam kerja4 Tukang Batu 80,000.00 1 hari = 7 jam kerja5 Tukang Besi 80,000.00 1 hari = 7 jam kerja6 Tukang Cat 80,000.00 1 hari = 7 jam kerja7 Kepala Tukang 90,000.00 1 hari = 7 jam kerja8 Mandor 85,000.00 1 hari = 7 jam kerja

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

1.) Pembesian balok Sloof ( 25/40 )

ketPanjang Jumlah

bentang 25/40 balok( m )

3.5 m 22 4.78 m 10 D 16 1,051.60 87.63 btg 1659.68 kg

Total berat = 1660 kg

Berat besi tulangan = 0,006165 x d2 x panjang batang tulangan

Panjang Tulangan + Join Tekukan

40 d

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

2.) Pembesian balok Sloof ( 16/16 )

ketJumlahbalok

3.5 m 1 4.46 m 4 Ø 12 17.84 1.49 btg 15.84 kg1.9 m 1 2.86 m 4 Ø 13 11.44 0.95 btg 11.92 kg

Total berat = 27.76 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang bentangan

Panjang Tulangan + Join Tekukan

40 d

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

m¹m¹

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

3.) Pembesian kolom (25/25) lantai 1

Tinggi Kolom ketJumlahkolom

3.5 m 15 4.26 m 8 D 19 511.20 42.60 btg 1137.71 kg

Total berat = 1137.71 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Tulangan + Join/Tekukan

40 d

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

4.) Pembesian kolom (25/25) lantai 2

Tinggi Kolom ketJumlahkolom

3 m 15 3.76 m 8 D 19 451.20 37.60 btg 1004.17 kg

Total berat = 1004.17 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Tulangan + Join/Tekukan

40 d

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

5.) Pembesian kolom (25/25) lantai 3

Tinggi Kolom ketJumlahkolom

3 m 9 3.76 m 8 D 19 270.72 22.56 btg 602.50 kg

Total berat = 602.50 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Tulangan +

Join/Tekukan 40 d

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

6.) Pembesian kolom (15/25) lantai 2

Tinggi Kolom ketJumlahkolom

3 m 2 3.76 m 6 D 19 45.12 3.76 btg 100.42 kg

Total berat = 100.42 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Tulangan + Join/Tekukan

40 d

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

7.) Pembesian kolom (15/25) lantai 3 (pagar)

Tinggi Kolom ketJumlahkolom

1.5 m 5 1.5 m 6 D 19 45.00 3.75 btg 100.15 kg

Total berat = 100.15 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Tulangan + Join/Tekukan

40 d

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

8.) Pembesian kolom (15/15) lantai 1

Tinggi Kolom ketJumlahkolom

3.5 m 7 3.98 m 4 Ø 12 111.44 9.29 btg 98.93 kg

Total berat = 98.93 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Tulangan + Join/Tekukan

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

9.) Pembesian kolom (15/15) lantai 2

Tinggi Kolom ketJumlahkolom

3 m 12 3.48 m 4 Ø 12 167.04 13.92 btg 148.29 kg

Total berat = 148.29 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Tulangan + Join/Tekukan

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

10.) Pembesian kolom (15/15) lantai 3

Tinggi Kolom ketJumlahkolom

3 m 6 3.48 m 6 Ø 12 125.28 10.44 btg 111.22 kg

Total berat = 111.22 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Tulangan + Join/Tekukan

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

11.) Pembesian balok (25 x 30) bentangan 3,5 m lantai 2

Panjang Tulangan ketJumlahbalok

3.5 m 10 4.26 m 6 D 19 255.60 21.30 btg 568.85 kg0.875 m 10 1.635 m 2 D 19 32.70 2.73 btg 72.78 kg Tumpuan1.75 m 10 2.51 m 1 D 19 25.10 2.09 btg 55.86 kg Lapangan

Total berat = 697.49 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Balok Tulangan tumpuan

+ Join

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

m¹m¹m¹

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

12.) Pembesian balok (25 x 30) bentangan 3,5 m lantai 3

Panjang Tulangan ketJumlahbalok

3.5 m 10 4.26 m 6 D 19 255.60 21.30 btg 568.85 kg0.875 m 10 1.635 m 2 D 19 32.70 2.73 btg 72.78 kg Tumpuan1.75 m 10 2.51 m 1 D 19 25.10 2.09 btg 55.86 kg Lapangan

Total berat = 697.49 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Balok Tulangan tumpuan

+ Join

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

m¹m¹m¹

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

13.) Pembesian balok (25 x 30) bentangan 3,5 m Atap Dag

Panjang Tulangan ketJumlahbalok

3.5 m 6 4.26 m 6 D 19 153.36 12.78 btg 341.31 kg0.875 m 6 1.635 m 2 D 19 19.62 1.64 btg 43.67 kg Tumpuan1.75 m 6 2.51 m 1 D 19 15.06 1.26 btg 33.52 kg Lapangan

Total berat = 418.50 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Balok Tulangan tumpuan

+ Join

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

m¹m¹m¹

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

14.) Pembesian balok (25 x 30) bentangan 4m lantai 2

Panjang Tulangan ketJumlahbalok

4 m 24 4.76 m 6 D 19 685.44 57.12 btg 1525.49 kg1 m 24 1.76 m 2 D 19 84.48 7.04 btg 188.02 kg Tumpuan2 m 24 2.76 m 1 D 19 66.24 5.52 btg 147.42 kg Lapangan

Total berat = 1860.93 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Balok Tulangan tumpuan

+ Join

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

m¹m¹m¹

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

15.) Pembesian balok (25 x 30) bentangan 4m lantai 3

Panjang Tulangan ketJumlahbalok

4 m 24 4.76 m 6 D 19 685.44 57.12 btg 1525.49 kg1 m 24 1.76 m 2 D 19 84.48 7.04 btg 188.02 kg Tumpuan2 m 24 2.76 m 1 D 19 66.24 5.52 btg 147.42 kg Lapangan

Total berat = 1860.93 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Balok Tulangan tumpuan

+ Join

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

m¹m¹m¹

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

16.) Pembesian balok (25 x 30) bentangan 4m atap dag

Panjang Tulangan ketJumlahbalok

4 m 6 4.76 m 6 D 19 171.36 14.28 btg 381.37 kg1 m 6 1.76 m 2 D 19 21.12 1.76 btg 47.00 kg Tumpuan2 m 6 2.76 m 1 D 19 16.56 1.38 btg 36.86 kg Lapangan

Total berat = 465.23 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Balok Tulangan tumpuan

+ Join

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

m¹m¹m¹

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

17.) Pembesian balok (20 x 20) bentangan 3,5 m lantai 2

Panjang Tulangan ketJumlahbalok

3.5 m 9 4.14 m 6 D 16 223.56 18.63 btg 352.83 kg0.875 m 9 1.515 m 2 D 16 27.27 2.27 btg 43.04 kg Tumpuan1.75 m 9 2.39 m 1 D 16 21.51 1.79 btg 33.95 kg Lapangan

Total berat = 429.82 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Balok Tulangan tumpuan

+ Join

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

m¹m¹m¹

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

18.) Pembesian balok (20 x 20) bentangan 3,5 m lantai 3

Panjang Tulangan ketJumlahbalok

3.5 m 4 4.14 m 6 D 16 99.36 8.28 btg 156.81 kg0.875 m 4 1.515 m 2 D 16 12.12 1.01 btg 19.13 kg Tumpuan1.75 m 4 2.39 m 1 D 16 9.56 0.80 btg 15.09 kg Lapangan

Total berat = 191.03 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Balok Tulangan tumpuan

+ Join

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

m¹m¹m¹

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

19.) Pembesian balok (20 x 20) bentangan 3,5 m atap dag

Panjang Tulangan ketJumlahbalok

3.5 m 2 4.14 m 6 D 16 49.68 4.14 btg 78.41 kg0.875 m 2 1.515 m 2 D 16 6.06 0.51 btg 9.56 kg Tumpuan1.75 m 2 2.39 m 1 D 16 4.78 0.40 btg 7.54 kg Lapangan

Total berat = 95.52 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Balok Tulangan tumpuan

+ Join

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

m¹m¹m¹

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

20.) Pembesian balok (20 x 20) bentangan 2 m lantai 2

Panjang Tulangan ketJumlahbalok

2 m 1 2.64 m 6 D 16 15.84 1.32 btg 25.00 kg0.5 m 1 1.14 m 2 D 16 2.28 0.19 btg 3.60 kg Tumpuan1 m 1 1.64 m 1 D 16 1.64 0.14 btg 2.59 kg Lapangan

Total berat = 31.19 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Balok Tulangan tumpuan

+ Join

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

m¹m¹m¹

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

21.) Pembesian balok (20 x 20) bentangan 2 m lantai 3

Panjang Tulangan ketJumlahbalok

2 m 1 2.64 m 6 D 16 15.84 1.32 btg 25.00 kg0.5 m 1 1.14 m 2 D 16 2.28 0.19 btg 3.60 kg Tumpuan1 m 1 1.64 m 1 D 16 1.64 0.14 btg 2.59 kg Lapangan

Total berat = 31.19 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Balok Tulangan tumpuan

+ Join

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

m¹m¹m¹

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

22.) Pembesian balok (20 x 20) bentangan 1,5 m lantai 2 dan 3

Panjang Tulangan ketJumlahbalok

1.5 m 2 2.14 m 6 D 16 25.68 2.14 btg 40.53 kg0.375 m 2 1.015 m 2 D 16 4.06 0.34 btg 6.41 kg Tumpuan0.75 m 2 1.39 m 1 D 16 2.78 0.23 btg 4.39 kg Lapangan

Total berat = 51.32 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Balok Tulangan tumpuan

+ Join

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

m¹m¹m¹

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

23.) Pembesian balok (20 x 20) bentangan 1 m lantai 2 dan 3

Panjang Tulangan ketJumlahbalok

1 m 8 1.64 m 6 D 16 78.72 6.56 btg 124.24 kg0.25 m 8 0.89 m 2 D 16 14.24 1.19 btg 22.47 kg Tumpuan0.5 m 8 1.14 m 1 D 16 9.12 0.76 btg 14.39 kg Lapangan

Total berat = 161.11 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Balok Tulangan tumpuan

+ Join

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

m¹m¹m¹

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

24.) Pembesian balok latei (12 x 12 ) dan konsol kantiliver

Panjang Tulangan ketJumlahbalok

1 m 1 1 m 7 Ø 10 7.00 0.58 btg 4.32 kg0.7 m 1 0.7 m 7 Ø 10 4.90 m¹ 0.41 btg 3.02 kg

Total berat = 7.34 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Balok Tulangan tumpuan

+ Join

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

25.) Pembesian balok (20 x 20) bentangan 0,78 m lantai 2 dan 3

Panjang Tulangan ketJumlahbalok

0.78 m 5 1.42 m 7 D 16 49.70 4.14 btg 78.44 kg

Total berat = 78.44 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Panjang Balok Tulangan tumpuan

+ Join

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

26.) Pembesian plat lantai 2

Panjang Tulangan ket

3.5 m 2 3.9 m 18 Ø 10 136.50 11.38 btg 84.15 kg lebar 3,5 m16.5 m 2 16.9 m 18 Ø 10 591.50 m¹ 49.29 btg 364.66 kg lebar 3,5 m12.5 m 2 12.9 m 18 Ø 10 451.50 37.63 btg 278.35 kg lebar 3,5 m

7 m 2 7.4 m 60 Ø 10 888.00 m¹ 74.00 btg 547.45 kg lebar 12 m

Total berat = 1274.61 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Tulangan atas dan bawah

Panjang Tulangan + Join

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

27.) Pembesian plat lantai 3

Panjang Tulangan ket

3.5 m 2 3.9 m 18 Ø 10 136.50 11.38 btg 84.15 kg lebar 3,5 m7 m 2 7.4 m 60 Ø 10 888.00 m¹ 74.00 btg 547.45 kg lebar 12 m

16.5 m 2 16.9 m 10 Ø 10 329.55 m¹ 27.46 btg 203.17 kg lebar 1,9 m12.5 m 2 12.9 m 18 Ø 10 451.50 37.63 btg 278.35 kg lebar 1,9 m 11.5 m 2 11.9 m 17 Ø 10 404.60 m¹ 33.72 btg 249.44 kg lebar 3,4 m

Total berat = 1362.56 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Tulangan atas dan bawah

Panjang Tulangan + Join

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

28.) Pembesian plat atap dag

Panjang Tulangan ket

8.6 m 2 9 m 35 Ø 10 630.00 52.50 btg 388.40 kg lebar 7 m7 m 2 7.4 m 43 Ø 10 636.40 m¹ 53.03 btg 392.34 kg lebar 8,6 m

Total berat = 780.74 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Tulangan atas dan bawah

Panjang Tulangan + Join

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

29.) Pembesian plat bordes (2)

Panjang Tulangan ket

1.7 m 2 2.1 m 15 Ø 12 63.00 5.25 btg 55.93 kg lebar 3 m3 m 2 3.4 m 9 Ø 16 57.80 m¹ 4.82 btg 91.22 kg lebar 1,7 m

Total berat = 294.30 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

Tulangan atas dan bawah

Panjang Tulangan + Join

Jumlah Tulangan

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

30.) Pembesian tangga dari lantai 1 ke lantai 2 dan lantai 2 ke lantai 3

Panjang Tulangan ket

0.93 m 16 0.93 m 9 Ø 8 138.88 11.57 btg 109.59 kg lebar 1,4 m0.93 m 16 0.93 m 9 Ø 8 138.88 m¹ 11.57 btg 109.59 kg lebar 1,4 m3.1 m 2 3.5 m 11 Ø 12 78.40 m¹ 6.53 btg 139.20 kg lebar 1,4 m3.1 m 2 3.5 m 11 Ø 12 78.40 m¹ 6.53 btg 139.20 kg lebar 1,4 m1.4 m 16 4.2 m 1 Ø 8 67.20 m¹ 5.60 btg 53.03 kg lebar 1,4 x 3 m1.4 m 16 4.2 m 1 Ø 8 67.20 m¹ 5.60 btg 53.03 kg lebar 1,4 x 3 m

Total berat = 603.65 kg

Berat besi tulangan = 0.006165 x d2 x panjang batang tulangan

jumlah tangga /plat

Panjang Tulangan + Join

Jumlah Tulangan/

anak tangga

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

31.) Pembesian begel sloof ( 25/40 ) dan (16/16)

Ket.

1.2 m 440 1.36 m 66 Ø 10 598.40 49.87 btg 368.91 kg 25/400.44 m 36 0.6 m 5.4 Ø 10 21.60 m¹ 1.80 btg 13.32 kg 16/16

Total berat = 382 kg

Berat besi tulangan = 0,006165 x d2 x panjang batang tulangan

Panjang Tulangan Begel

Jumlah Begel (buah)

Panjang Tulangan + Tekukan 4 d

Jumlah Panjang Balok

(m)

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

32.) Pembesian begel kolom ( 25/25 ) dan (15/15) lantai 1

Ket.

0.76 m 350 0.92 m 52.5 Ø 10 322.00 26.83 btg 198.51 kg 25/250.4 m 163 0.56 m 24.5 Ø 10 91.47 m¹ 7.62 btg 56.39 kg 15/15

Total berat = 255 kg

Berat besi tulangan = 0,006165 x d2 x panjang batang tulangan

Panjang Tulangan Begel

Jumlah Begel (buah)

Panjang Tulangan + Tekukan 4 d

Jumlah Tinggi kolom

(m)

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

33) Pembesian begel kolom ( 25/25 ) dan (15/15) lantai 2

Ket.

0.76 m 280 0.92 m 42 Ø 10 257.60 21.47 btg 158.81 kg 25/250.4 m 80 0.56 m 12 Ø 10 44.80 m¹ 3.73 btg 27.62 kg 15/15

Total berat = 186 kg

Berat besi tulangan = 0,006165 x d2 x panjang batang tulangan

Panjang Tulangan Begel

Jumlah Begel (buah)

Panjang Tulangan + Tekukan 4 d

Jumlah Tinggi kolom

(m)

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

34.) Pembesian begel kolom ( 25/25 ) dan (15/15) lantai 3

Ket.

0.76 m 180 0.92 m 27 Ø 10 165.60 13.80 btg 102.09 kg 25/250.4 m 40 0.56 m 6 Ø 10 22.40 m¹ 1.87 btg 13.81 kg 15/15

Total berat = 116 kg

Berat besi tulangan = 0,006165 x d2 x panjang batang tulangan

Panjang Tulangan Begel

Jumlah Begel (buah)

Panjang Tulangan + Tekukan 4 d

Jumlah Tinggi kolom

(m)

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

35.) Pembesian begel kolom ( 25/15 ) lantai 2 dan 3

Ket.

0.62 m 40 0.78 m 6 Ø 10 31.20 2.60 btg 19.23 kg lt10.62 m 50 0.78 m 7.5 Ø 10 39.00 m¹ 3.25 btg 24.04 kg lt2

Total berat = 43 kg

Berat besi tulangan = 0,006165 x d2 x panjang batang tulangan

Panjang Tulangan Begel

Jumlah Begel (buah)

Panjang Tulangan + Tekukan 4 d

Jumlah Tinggi kolom

(m)

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

36.) Pembesian begel balok bordes ( 30/20 ) dari lantai 1 ke lantai 2 dan dari lantai 2 ke lantai 3

Ket.

0.62 m 60 0.78 m 9 Ø 10 46.80 3.90 btg 28.85 kg lt10.62 m 60 0.78 m 9 Ø 10 46.80 m¹ 3.90 btg 28.85 kg lt2

Total berat = 58 kg

Berat besi tulangan = 0,006165 x d2 x panjang batang tulangan

Panjang Tulangan Begel

Jumlah Begel (buah)

Panjang Tulangan + Tekukan 4 d

Jumlah panjang

balok (m)

Diameter Besi Tulangan

Jumlah Panjang besi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

PERHITUNGAN VOLUME PEKERJAAN RUKO 3 LANTAI

IV PEKERJAAN PEMBESIAN

37.) Pembesian pondasi footplat

Panjang Tulangan Ket.

2.7 m - 2.86 m 18 D 16 15 bh 22.50 btg 426.12 kg telapak2.59 m - 2.59 m 8 D 19 15 bh 10.00 btg 33.38 kg tul.kolom1.01 m 7 0.92 m 93 Ø 10 15 bh 7.74 btg 57.29 kg begel

Total berat = 517 kg

Berat besi tulangan = 0,006165 x d2 x panjang batang tulangan

Jumlah Begel (buah)

Panjang Tulangan + Tekukan

Jumlah panjang

tulangan (m)

Diameter Besi Tulangan

Jumlah Pondasi

Kebutuhan besi tulangan (Batang)

Berat Besi Tulangan (kg)

4.16 Menentukan Durasi Perkiraan Pekerjaan

MENENTUKAN HARI PERKIRAAN PEKERJAAN

PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI DI JALAN MARSMA ISWAHYUDI BALIKPAPANTAHUN : 2012

No. Uraian Pekerjaan Volume

Harga Koefisien Pekerja

SatuanPekerja Tukang

( Rp)

1 2 3 5 7 8 9 10 11 12

I PEKERJAAN PENDAHULUAN

1 Pembersihan lokasi pekerjaan 367.50 10,250.00 0.1 0.1 36.75 9 4.08

2 Membuat Gudang Kerja 12.00 1,135,250.00 1 2 3 36 9 4.00

3 Penyediaan Air Kerja 1.00 1,000,000.00 0 0 9 0.00

4 Penyediaan Listrik 1.00 1,000,000.00 0 0 9 0.00

5 Pengukuran dan pemasangan bouplank 53.00 82,125.00 0.1 0.10 0.2 10.6 9 1.18

Hari Perkiraan 9

II PEKERJAAN TANAH GALIAN/ URUGAN PASIR DAN PASANGAN

1 Galian pondasi foot plat 42.63 27,400.00 0.4 0.4 17.052 9 1.89

2 Menguruk kembali bekas galian pondasi 32.55 13,135.00 0.192 0.192 6.2496 9 0.69

3 Urugan pasir bawah pondasi 1.47 108,850.00 0.735 0.735 1.08045 9 0.12

4 Pekerjaan pancang ulin 10 x 10 - 4 m 75.00 276,100.00 0.1 0.25 0.35 26.25 9 2.92

5 Urugan tanah menambah elevasi lantai 14.2 69,850.00 0 0 9 0.00

Hari Perkiraan 6

III PEKERJAAN BETON

1 Pondasi footplat Beton K225 18.75 1,374,948.50 1.65 0.25 1.9 35.625 9 3.96

2 Cor Sloof 25/40 Beton K225 6.60 1,374,948.50 1.65 0.25 1.9 12.54 9 1.39

3 Cor Sloof 16/16 Beton K225 0.14 1,374,948.50 1.65 0.25 1.9 0.266 9 0.03

4 Kolom 25/25 lantai 1 Beton K225 3.07 1,374,948.50 1.65 0.25 1.9 5.833 9 0.65

5 Kolom 25/25 lantai 2 Beton K225 2.53 1,374,948.50 1.65 0.25 1.9 4.807 9 0.53

6 Kolom 25/25 lantai 3 Beton K225 1.52 1,374,948.50 1.65 0.25 1.9 2.888 9 0.32

7 Kolom 15/25 lantai 2 Beton K225 0.20 1,374,948.50 1.65 0.25 1.9 0.38 9 0.04

8 Kolom 15/25 lantai 3 Beton K225 0.25 1,374,948.50 1.65 0.25 1.9 0.475 9 0.05

9 Kolom 15/15 lantai 1 Beton K225 0.52 1,374,948.50 1.65 0.25 1.9 0.988 9 0.11

10 Kolom 15/15 lantai 2 Beton K225 0.73 1,374,948.50 1.65 0.25 1.9 1.387 9 0.15

11 Kolom 15/15 lantai 3 Beton K225 0.36 1,374,948.50 1.65 0.25 1.9 0.684 9 0.08

12 Balok 25/30 lantai 2 Beton K225 4.95 1,374,948.50 1.65 0.25 1.9 9.405 9 1.05

13 Balok 25/30 lantai 3 Beton K225 4.95 1,374,948.50 1.65 0.25 1.9 9.405 9 1.05

14 Balok 25/30 atap dag Beton K225 3.38 1,374,948.50 1.65 0.25 1.9 6.422 9 0.71

15 Balok 20/20 lantai 2 Beton K225 1.38 1,374,948.50 1.65 0.25 1.9 2.622 9 0.29

16 Balok 20/20 lantai 3 Beton K225 0.68 1,374,948.50 1.65 0.25 1.9 1.292 9 0.14

17 Balok 20/20 atap dag Beton K225 0.28 1,374,948.50 1.65 0.25 1.9 0.532 9 0.06

18 Tangga Beton lt 1 ke lt 2 Beton K225 3.22 1,374,948.50 1.65 0.25 1.9 6.118 9 0.68

19 Tangga Beton lt 2 ke lt 3 Beton K225 2.85 1,374,948.50 1.65 0.25 1.9 5.415 9 0.60

20 Balok bordes 20/30 Beton K225 1.04 1,374,948.50 1.65 0.25 1.9 1.976 9 0.22

21 Rabat beton Beton 1:3:5 11.24 970,472.00 1.65 0.25 1.9 21.356 9 2.37

22 Plat lantai 2 Beton K225 9.73 1,374,948.50 1.65 0.25 1.9 18.487 9 2.05

23 Plat lantai 3 Beton K225 10.13 970,472.00 1.65 0.25 1.9 19.247 9 2.14

24 Plat atap dag Beton K225 5.16 1,374,948.50 1.65 0.25 1.9 9.804 9 1.09

25 Beton duc bawah kusen Beton 1:3:5 0.012 970,472.00 1.65 0.25 1.9 0.0228 9 0.00

26 Balok latei atas kusen Beton K225 0.01 1,374,948.50 1.65 0.25 1.9 0.019 9 0.00

27 Konsol kantiliver Beton 1:3:5 0.05 970,472.00 1.65 0.25 1.9 0.095 9 0.01

Hari Perkiraan 20

IV PEKERJAAN PEMBESIAN

1 Pek. Pembesian Balok Sloof 25/40 1,659.68 11,606.00 0.007 0.007 0.014 23.2354806 9 2.58

2 Pek. Pembesian Balok Sloof 16/16 27.76 11,606.00 0.007 0.007 0.014 0.38859524 9 0.04

3 Pek. Pembesian kolom 25/25 2,744.39 11,606.00 0.007 0.007 0.014 38.421442 9 4.27

4 Pek. Pembesian kolom 15/25 200.57 11,606.00 0.007 0.007 0.014 2.80795085 9 0.31

5 Pek. Pembesian kolom 15/15 358.44 11,606.00 0.007 0.007 0.014 5.01818769 9 0.56

6 Pek. Pembesian balok 25/30 6,000.57 11,606.00 0.007 0.007 0.014 84.0079569 9 9.33

7 Pek. Pembesian balok 20/20 1,069.60 11,606.00 0.007 0.007 0.014 14.9744674 9 1.66

8 Pek. Pembesian balok 12/12 balok latei 7.34 10,871.00 0.007 0.007 0.014 0.1027089 9 0.01

9 Pek. Pembesian plat lantai 2 1,274.61 10,871.00 0.007 0.007 0.014 17.8445925 9 1.98

10 Pek. Pembesian plat lantai 3 1,362.56 10,871.00 0.007 0.007 0.014 19.0758047 9 2.12

11 Pek. Pembesian plat atap dag 780.74 10,871.00 0.007 0.007 0.014 10.9302984 9 1.21

12 Pek. Pembesian plat bordes 294.30 11,606.00 0.007 0.007 0.014 4.12023226 9 0.46

13 Pek. Pembesian tangga 897.95 10,871.00 0.007 0.007 0.014 12.5712655 9 1.40

14 Pek. Pembesian begel sloof 25/40 dan 16/16 382.23 10,871.00 0.007 0.007 0.014 5.35122 9 0.59

15 Pek. Pembesian begel kolom 25/25 dan 15/15 557.23 10,871.00 0.007 0.007 0.014 7.8012732 9 0.87

16 Pek. Pembesian begel kolom 25/15 43.28 10,871.00 0.007 0.007 0.014 0.6058962 9 0.07

17 Pek. Pembesian begel balok bordes 57.70 10,871.00 0.007 0.007 0.014 0.8078616 9 0.09

Koefisien Pekerja +

tukang

Jumlah Pekerja

Tenaga tersedia

Rencana hari

MENENTUKAN HARI PERKIRAAN PEKERJAAN

PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI DI JALAN MARSMA ISWAHYUDI BALIKPAPANTAHUN : 2012

18 Pek. Pembesian pondasi foot plat 516.79 11,606.00 0.007 0.007 0.014 7.23510837 9 0.80

19 Pagar balkon dan pagar lantai 2 24.88 955,000.00

20 Pekerjaan Railing Tangga 21.70 955,000.00

Hari Perkiraan 28

V PEKERJAAN BEKISTING

1 Pek. Pemasangan bekisting Foot plat 22.32 190,115.00 0.3 0.26 0.56 12.4992 9 1.39

2 Pek. Pemasangan bekisting Sloof 25/40 52.80 207,615.00 0.3 0.26 0.56 29.568 9 3.29

3 Pek. Pemasangan bekisting Sloof 16/16 1.79 207,615.00 0.3 0.26 0.56 1.0024 9 0.11

4 Pek. Pemasangan bekisting Kolom 25/25 lantai 1 49.05 427,780.00 0.3 0.33 0.63 30.9015 9 3.43

5 Pek. Pemasangan bekisting Kolom 25/25 lantai 2 40.50 427,780.00 0.3 0.33 0.63 25.515 9 2.84

6 Pek. Pemasangan bekisting Kolom 25/25 lantai 3 24.30 427,780.00 0.3 0.33 0.63 15.309 9 1.70

7 Pek. Pemasangan bekisting Kolom 15/25 lantai 2 4.32 427,780.00 0.3 0.33 0.63 2.7216 9 0.30

8 Pek. Pemasangan bekisting Kolom 15/25 lantai 3 10.80 427,780.00 0.3 0.33 0.63 6.804 9 0.76

9 Pek. Pemasangan bekisting Kolom 15/15 lantai 1 13.73 427,780.00 0.3 0.33 0.63 8.6499 9 0.96

10 Pek. Pemasangan bekisting Kolom 15/15 lantai 2 23.55 427,780.00 0.3 0.33 0.63 14.8365 9 1.65

11 Pek. Pemasangan bekisting Kolom 15/15 lantai 3 11.78 427,780.00 0.3 0.33 0.63 7.4214 9 0.82

12 9.15 427,780.00 0.3 0.33 0.63 5.7645 9 0.64

13 Pek. Pemasangan bekisting Balok 25/30 lantai 2 50.82 439,480.00 0.32 0.33 0.65 33.033 9 3.67

14 Pek. Pemasangan bekisting Balok 25/30 lantai 3 50.82 439,480.00 0.32 0.33 0.65 33.033 9 3.67

15 Pek. Pemasangan bekisting Balok 25/30 atap dag 34.65 439,480.00 0.32 0.33 0.65 22.5225 9 2.50

16 Pek. Pemasangan bekisting Balok 20/20 lantai 2 13.81 439,480.00 0.32 0.33 0.65 8.9765 9 1.00

17 Pek. Pemasangan bekisting Balok 20/20 lantai 3 6.80 439,480.00 0.32 0.33 0.65 4.42 9 0.49

18 Pek. Pemasangan bekisting Balok 20/20 atap dag 2.80 439,480.00 0.32 0.33 0.65 1.82 9 0.20

19 Pek. Pemasangan bekisting Tangga dari lt.1 ke lt.2 31.64 391,300.00 0.32 0.33 0.65 20.566 9 2.29

20 Pek. Pemasangan bekisting Tangga dari lt.2 ke lt.3 25.36 391,300.00 0.32 0.33 0.65 16.484 9 1.83

21 Pek. Pemasangan bekisting Balok Bordes 20/30 9.46 439,480.00 0.32 0.33 0.65 6.149 9 0.68

22 Pek. Pemasangan bekisting Balok latei 12/12 0.17 439,480.00 0.32 0.33 0.65 0.1105 9 0.01

23 Pek. Pemasangan bekisting Konsol Kantiliver 0.70 439,480.00 0.32 0.33 0.65 0.455 9 0.05

24 Pek. Pemasangan bekisting Plat lantai 2 81.05 706,300.00 0.32 0.33 0.65 52.6825 9 5.85

25 Pek. Pemasangan bekisting Plat lantai 3 84.32 706,300.00 0.32 0.33 0.65 54.808 9 6.09

26 Pek. Pemasangan bekisting Plat atap dag 51.51 706,300.00 0.32 0.33 0.65 33.4815 9 3.72

Hari Perkiraan 50

VI PEKERJAAN DINDING

1 Pek. Pasangan bata 1 : 2 dinding kamar mandi lantai 1 0.46 1,380,125.00 6 2 8 3.688 9 0.41

2 Pek. Pasangan bata 1 : 2 dinding kamar mandi lantai 2 3.95 1,380,125.00 6 2 8 31.632 9 3.51

3 Pek. Pasangan bata 1 : 4 lantai 1 14.03 1,269,855.00 6 2 8 112.248 9 12.47

4 Pek. Pasangan bata 1 : 4 lantai 2 15.38 1,269,855.00 6 2 8 123.04 9 13.67

5 Pek. Pasangan bata 1 : 4 lantai 3 11.00 1,269,855.00 6 2 8 88.024 9 9.78

6 Pek. Pasangan bata 1:4 balkon lt 2 dan pagar lt 3 1.00 1,269,855.00 6 2 8 7.992 9 0.89

7 Pek. Plesteran 1 : 2 88.30 43,827.00 0.2 0.15 0.35 30.905 9 3.43

8 Pek. Plesteran 1 : 4 lantai 1 280.62 39,220.00 0.2 0.15 0.35 98.217 9 10.91

9 Pek. Plesteran 1 : 4 lantai 2 307.60 39,220.00 0.2 0.15 0.35 107.66 9 11.96

10 Pek. Plesteran 1 : 4 lantai 3 307.60 39,220.00 0.2 0.15 0.35 107.66 9 11.96

Hari Perkiraan 79

VII PEKERJAAN LANTAI

1 Pemasangan Keramik 40 x 40 lantai 1 87.50 183,053.00 0.62 0.35 0.97 84.875 9 9.43

2 Pemasangan Keramik 30/30 teras 7.00 183,053.00 0.62 0.35 0.97 6.79 9 0.75

3 Pas.Keramik 20 x 20 kamar mandi lantai 1 7.00 165,453.00 0.62 0.35 0.97 6.79 9 0.75

4 Pas. Keramik dinding kamar mandi 20 x 30 lantai 1 20.45 165,453.00 0.62 0.35 0.97 19.8365 9 2.20

5 Pemasangan Keramik 40 x 40 lantai 2 91.50 183,053.00 0.62 0.35 0.97 88.755 9 9.86

6 Pemasangan Keramik 30 x 30 balkon lantai 2 3.20 183,053.00 0.62 0.35 0.97 3.104 9 0.34

7 Pas.Keramik 20 x 20 kamar mandi lantai 2 3.00 165,453.00 0.62 0.35 0.97 2.91 9 0.32

8 Pas. Keramik dinding kamar mandi 20 x 30 lantai 2 14.02 165,453.00 0.62 0.35 0.97 13.5994 9 1.51

9 Pemasangan Keramik 40 x 40 lantai 3 39.00 183,053.00 0.62 0.35 0.97 37.83 9 4.20

10 Pas.Keramik 20 x 20 kamar mandi lantai 3 3.00 165,453.00 0.62 0.35 0.97 2.91 9 0.32

11 Pas. Keramik dinding kamar mandi 20 x 30 lantai 3 14.20 165,453.00 0.62 0.35 0.97 13.774 9 1.53

12 Pemasangan Keramik 25 x 25 tangga lantai 1 ke lant 16.30 183,053.00 0.62 0.35 0.97 15.811 9 1.76

13 Pemasangan Keramik 25 x 25 tangga lantai 2 ke lant 15.80 183,053.00 0.62 0.35 0.97 15.326 9 1.70

Hari Perkiraan 35

VIII PEKERJAAN LANGIT-LANGIT / PLAFOND

1 Pas. Rangka plafond 273.15 157,687.50 0.31 0.47 0.78 213.057 9 23.67

2 Plafond Gypsum 273.15 157,687.50 0.31 0.47 0.78 213.057 9 23.67

Hari Perkiraan 47

IX PEK. KUSEN, DAUN PINTU DAN JENDELA

1 Kusen pintu kayu bangkirai 0.43 10,565,500.00 6 20 26 11.128 9 1.24

2 Kusen jendela kayu bangkirai 0.09 10,565,500.00 6 20 26 2.21 9 0.25

Pek. Pemasangan bekisting Kolom 25/25 diatas Foot plat

MENENTUKAN HARI PERKIRAAN PEKERJAAN

PEKERJAAN : RENCANA PEMBANGUNAN RUMAH TOKO (RUKO) 3 LANTAI DI JALAN MARSMA ISWAHYUDI BALIKPAPANTAHUN : 2012

3 Daun pintu panel kayu bangkirai 18.48 566,750.00 1 2.5 3.5 64.68 9 7.19

4 Rangka ventilasi kayu bengkirai 0.07 10,565,500.00 6 20 26 1.794 9 0.20

5 Rangka roster kayu bengkirai 0.09 10,565,500.00 6 20 26 2.34 9 0.26

6 Daun jendela kaca rangka kayu bangkirai 6.51 566,750.00 1 2.5 3.5 22.785 9 2.53

7 Pintu harmonika 15.80 700,000.00

8 Pasangan kaca mati bening 5 mm 1.60 162,813.75

Hari Perkiraan 12

X PEKERJAAN INSTALASI LISTRIK

1 Pasang instalasi titik lampu 50 109,146.00

2 Pasang instalasi stop kontak 15 109,146.00

3 Pasang box MCB 2 188,900.00

4 Saklar tunggal setara Broco 6 25,000.00

5 Saklar ganda setara Broco 10 25,000.00

6 Stop kontak setara Broco 15 25,300.00

7 Box Panel 300 x 400 x 200 mm/Legrand + Accessorie 2 173,000.00

8 Lampu Jari (TL) 15 Watt Phillips 25 24,500.00

9 Lampu Neon (TL) 30 Watt Phillips 25 95,000.00

Hari Perkiraan 6

XI PEKERJAAN SANITAIR DAN INSTALASI AIR

1 Instalasi Pipa 4" 17.75 27,550.00 0.036 0.0018 0.0378 0.67095 9 0.07

2 Instalasi Pipa 3" 39.16 24,500.00 0.036 0.0018 0.0378 1.480248 9 0.16

3 Instalasi Pipa 1/2" 44.90 17,728.00 0.036 0.0018 0.0378 1.69722 9 0.19

4 Bak Kontrol 1.00 463,556.60 1.42 0.473 1.893 1.893 9 0.21

5 Kran 9.00 235,000.00

6 Floor Drain 4.00 12,000.00

7 Pasang Closed Jongkok 4.00 150,000.00

8 kitchen zink 1.00 320,000.00

9 Biofil 2 x 1 x 1,5 1.00 13,600,000.00 0.64

Hari Perkiraan 6.00

XII PEKERJAAN PENGECATAN

1 Cat dinding Lantai 1 561.24 31,859.50 0.02 0.063 0.083 46.58292 9 5.18

2 Cat dinding Lantai 2 615.20 31,859.50 0.02 0.063 0.083 51.0616 9 5.67

3 Cat dinding Lantai 3 22.01 31,859.50 0.02 0.063 0.083 1.826498 9 0.20

4 Cat plafond 273.15 31,859.50 0.02 0.063 0.083 22.67145 9 2.52

5 Cat kusen pintu KPJ1 dengan cat minyak 12.42 33,392.50 0.07 0.009 0.079 0.98118 9 0.11

6 Cat kusen pintu KP1 dengan cat minyak 13.25 33,392.50 0.07 0.009 0.079 1.04675 9 0.12

7 Cat kusen pintu KP2 dengan cat minyak 22.21 33,392.50 0.07 0.009 0.079 1.75459 9 0.19

8 Cat kusen pintu KJ1 dengan cat minyak 5.12 33,392.50 0.07 0.009 0.079 0.40448 9 0.04

9 Cat Ranga V1 dengan cat minyak 1.08 33,392.50 0.07 0.009 0.079 0.08532 9 0.01

10 Cat Ranga V2 dengan cat minyak 0.91 33,392.50 0.07 0.009 0.079 0.07189 9 0.01

11 Cat Ranga R1 dengan cat minyak 1.05 33,392.50 0.07 0.009 0.079 0.08295 9 0.01

12 Cat Ranga R2 dengan cat minyak 1.17 33,392.50 0.07 0.009 0.079 0.09243 9 0.01

Hari Perkiraan 14

XIII PEKERJAAN PENGGANTUNG DAN PENGUNCI

1 Pasang kunci pintu utama 2 187,000.00

2 Pasang kunci pintu 8 98,000.00

3 Pas. Engsel pintu 4" 68 42,000.00

4 Pas. Grendel pintu (panjang) 2 9,500.00

5 Pas. Grendel jendela 7 6,500.00

6 Pas Grendel pintu (kecil) 8 6,500.00

7 Pas. Engsel jendela 12 36,000.00

8 Hak Angin standard 14 14,000.00

9 Pas. Handel Jendela 7 7,000.00

Hari Perkiraan 3

XIV PEKERJAAN LAIN-LAIN

1 Pembersihan lokasi pekerjaan 1.00 1,000,000.00

2 Quality Control 1.00 1,000,000.00

Hari Perkiraan 5