DATA DASARPROGRAM NASIONALPEMBERDAYAAN MASYARAKATMANDIRI - PERDESAANPNPM - MPdDATA DASAR RAB BANGUNAN GEDUNGPROVINSI:Jawa TimurKABUPATEN:BanyuwangiKECAMATAN:TegaldlimoDESA:PurwoasriLOKASI KEGIATAN:KrajanPROGRAM:PNPM - MPdFASILITATOR TEKNIK:................................FASILITATOR KECAMATAN:Yusron Bastian, SABNAMA PJOK:..............................NIP PJOK:NIP. .................................KEPALA DESA:...............................KETUA TPK:.............................KADER TEKNIK:Apa MerekaTANGGAL KESEPAKATAN HARGA:03-February-2012FridayTANGGAL PEMBUATAN RAB:10 Februari 2012JENIS KEGIATAN:GEDUNG POSKESDESVOLUME /UKURAN/DIMENSI:7 x 10 mSUBPROJECT:NomorRAB01/Gdg/2012Jenis Kegiatan=GEDUNG POSKESDESUkuran=7 x 10 mNomorRAB02/Pgr/2012Jenis Kegiatan=Pemb. Pagar dan Papan NamaUkuran=1.5 x 23.5 mNomorRAB03/Pvg/2012Jenis Kegiatan=Pas. Paving Halaman SekolahUkuran=3 x 16.05 mNomorRAB04/Mbl/2012Jenis Kegiatan=Pengadaan MeubelairBy : Budi - FT Kec. Singojuruh - BWI

HARGA SATUANPNPM - Mandiri PerdesaanBERITA ACARA KESEPAKATAN HARGA SATUAN BAHAN DAN ALATPada hari Senin, tanggal 17 Mei tahun Dua Ribu Sepuluh telah diadakan kesepakatanharga, bahan, alat, upah oleh TPK - TPK di Kecamatan Singojuruh dengan perincian sebagaiberikut :No.Material / Alat / TenagaSatuanHarga SatuanABAHAN1Sirtum375,0002Pasir Urugm365,0003Pasir Pasang/Corm390,0004Batu Kali/Gunung/Gebalm385,0005Batu Pecah 2/3 (Koral Beton)m3125,0006Semen PC 40 Kgsak52,0007Semen warnaKg2,5008Batu Bata/merahbh4509Besi Beton 10 mmLjr67,00010Besi Beton 8 mmLjr41,00011Besi Beton 6 mmLjr26,00012Kawat BendratKg15,00013PakuKg15,00014Kayu Meranti, balok 8/12 (Kuda-kuda, gording, nok)Ljr160,000153,60015Kayu Meranti, balok 6/12 (Gapit kuda-kuda)Ljr122,500115,20016Kayu Meranti, balok 6/15 (Kusen)Ljr155,000144,00017Kayu Meranti, papan 3/20 (Slimar/Daunan, Listplank)Ljr102,00096,00018Kayu Meranti, papan 3/8 (Slimar / Daunan)Ljr40,00028,80019Kayu Meranti, balok 5/7 (Usuk)Ljr56,00056,00020Kayu Meranti, balok 4/6 (Plafond + Gantungan Plafond)Ljr40,00038,40021Kayu Meranti, reng 2/3 (Reng)Ljr10,0009,60022Kayu Meranti, papan 2/20 (Reuter+Papan talang)Ljr68,00064,00023Kayu list plafond 1/5 (Kayu non Profil)Ljr4,0008,00024Kayu Lokal, balok 5/7 (Kayu begesting)Ljr14,00017,50025Kayu Lokal, balok 2/3 (Kayu begesting)Ljr2,5003,00026Kayu Lokal / Randu, papan 2/20 (Kayu begesting)Ljr8,0009,60027Triplek tebal 4 mm (Begesting plat beton)Ljr50,00028Bambu kwalitas baik @ 3 m'Ljr10,00029Besi Plat strip / Kawel / BautKg10,00030Seng Talang BJLS 30, Lebar 60cmm'15,00031Genteng Karang Pilangm21,60032Genteng Bubungan Karang Pilangm'4,00033Pintu PVCunit325,00034Kaca Bening 5 mmm280,00035Keramik 40x40 warna motifDos40,00036Keramik 20/20 KM/WCDos35,00037Keramik dinding 20/25 KM/WCDos37,50038Roster beton topibh12,00039Playwood tbl 4 mm, 1.20 x 2.40 m (Langit-langit)Lbr50,00040Plamir TembokKg20,00041Plamir KayuKg17,50042Cat TembokKg18,00043Cat KayuKg43,00044Cat Meni Kayu Setara PedangKg20,00045Thinnerltr17,500No.Material / Alat / TenagaSatuanHarga Satuan46Kertas Gosok / amplaslbr3,00047Kunci tanam Pintu 1 x Putarstel70,00048Engsel Pintustel15,00049Engsel Jendelastel10,00050Grendel Jendelastel7,00051Hak Anginstel13,50052Pipa PVC 3/4"Ljr16,00053Pipa PVC 3"Ljr16,00054Kran air 1/2"unit6,00055Floor drainunit12,50056Klosed Jongkokunit120,00057Kabel NYA 1 x 2.5 mmm'8,00058Pipa Paralon 5/8"Ljr8,00059Isolatorbh4,80060Las Dopbh50061Fiiting Plafondbh10,50062T. Dos PVCbh1,50063Saklar gandabh25,00064Saklar tunggalbh25,00065Stop Kontakbh20,00066Panel BoxSet260,00067MCB 10 AMPbh75,00068Miniswitch 32 AMPbh30,00069Lampu SL 18 Wattbh65,00070Lampu Pijar 10 Wattbh40,00071Sanyobh250,00072Beton alur / garism280,00073Paving Stone Abu - abu tebal = 6 cmm245,000BALAT1Roll meter 50 mbh80,0002Meteran 5 mbh12,5003Benangroll10,0004Selangm'10,0005Linggisbh30,0006Gancobh35,0007Cangkulbh25,0008Sekopbh15,0009Hammer 5 Kgbh85,00010Hammer 2 Kgbh25,00011Cetokbh10,00012Ondrongbh15,00013Water passbh150,00014Emberbh7,50015Kereta dorongbh350,000CUPAH1PekerjaHOK30,0002TukangHOK37,500

Rekap RABREKAPITULASI RENCANA ANGGARAN BIAYAPropinsi:Jawa TimurKabupaten:BanyuwangiKecamatan:TegaldlimoDesa:PurwoasriNoUraianKegiatanGEDUNG POSKESDESBobot %KegiatanBobot %KegiatanBobot %JUMLAH TOTALBobot %Ukuran7 x 10 mUkuranUkuranJumlah1 unitJumlahJumlahNo. RAB01/Gdg/2012No. RABNo. RABPNPM-MPSwadayaPNPM-MPSwadayaPNPM-MPSwadayaPNPM-MPSwadayaI.BAHAN$87,687,3005,620,000.0075.6587,687,3005,620,00071.86II.PERALATAN0.0730,0000.000730,0000.00III.UPAH$28,230,00010,440,00024.3528,230,00010,440,00023.14JUMLAH$115,917,300$16,790,000100.00115,917,30016,790,00095.00IV.Operasional UPK 2 %2,440,4002V.Operasional TPK 3 %3,660,5003JUMLAH TOTAL$115,917,30016,790,000100.00122,018,20016,790,000100.00Jumlah Biaya Upah$28,230,00010,440,00024.3528,230,00010,440,000Jumlah HOK konstruksi1,168.00333.00HOK1,168333HOK1,501.000.01,501.00Purwoasri, 18 Pebruari 2013PjOKFasilitator KecamatanKetua TPKKader Teknik..............................................................Yusron Bastian, SAB.............................Apa MerekaNIP. .................................FK TeknikFK PemberdayaanNIP. 195 801 021 985 031 017

&L&"-,Italic"&11PNPM Mandiri Perdesaan Tahun 2010

1. RAB-GedungRENCANA ANGGARAN BIAYAPropinsi:Jawa TimurNo. RAB :01/Gdg/2012Kabupaten:BanyuwangiProgram :PNPM - MPdKecamatan:TegaldlimoJenis Kegiatan :GEDUNG POSKESDESDesa:PurwoasriUkuran / Dimensi :7 x 10 mURAIANVolumeKategori BiayaSatuanHarga Satuan (Rp )Jumlah Swadaya ( Rp )Jumlah PNPM-MPd ( Rp )TotalSwadayaDana PNPM-MP1. BAHAN1Sirtu25.000.025.00I.am375,0000.01,875,0002Pasir Urug10.0010.000.0I.am365,000650,0000.03Pasir Pasang/Cor44.000.044.00I.am390,0000.03,960,0004Batu Kali/Gunung/Gebal41.000.041.00I.am385,0000.03,485,0005Batu Pecah 2/3 (Koral Beton)3.000.03.00I.am3125,0000.0375,0006Semen PC 40 Kg237.0035202.00I.bsak52,0001,820,00010,504,0007Semen warna1.000.01.00I.bKg2,5000.02,5008Batu Bata/merah18,0287,00011,028.00I.bbh4503,150,0004,962,6009Besi Beton 12 mm73.000.073.00I.bLjr67,0000.04,891,00010Besi Beton 8 mm20.000.020.00I.bLjr41,0000.0820,00011Besi Beton 6 mm78.000.078.00I.bLjr26,0000.02,028,00012Kawat Bendrat15.000.015.00I.bKg15,0000.0225,00013Paku37.000.037.00I.bKg15,0000.0555,00014Kayu Meranti, balok 8/12 (Kuda-kuda, gording, nok)44.000.044.00I.aLjr160,0000.07,040,00015Kayu Meranti, balok 6/12 (Gapit kuda-kuda)2.000.02.00I.aLjr122,5000.0245,00016Kayu Meranti, balok 6/15 (Kusen)17.000.017.00I.aLjr155,0000.02,635,00017Kayu Meranti, papan 3/20 (Slimar/Daunan, Listplank)15.000.015.00I.aLjr102,0000.01,530,00018Kayu Meranti, papan 3/8 (Slimar / Daunan)10.000.010.00I.aLjr40,0000.0400,00019Kayu Meranti, balok 5/7 (Usuk)49.000.049.00I.aLjr56,0000.02,744,00020Kayu Meranti, balok 4/6 (Plafond + Gantungan Plafond)369.000.0369.00I.aLjr40,0000.014,760,00021Kayu Meranti, reng 2/3 (Reng)155.000.0155.00I.aLjr10,0000.01,550,00022Kayu Meranti, papan 2/20 (Reuter+Papan talang)10.000.010.00I.aLjr68,0000.0680,00023Kayu list plafond 1/5 (Kayu non Profil)19.000.019.00I.aLjr4,0000.076,00024Kayu Lokal, balok 5/7 (Kayu begesting)4.000.04.00I.aLjr14,0000.056,00025Kayu Lokal, balok 2/3 (Kayu begesting)5.000.05.00I.aLjr2,5000.012,50026Kayu Lokal / Randu, papan 2/20 (Kayu begesting)46.000.046.00I.aLjr8,0000.0368,00027Triplek tebal 4 mm (Begesting plat beton)2.000.02.00I.bLjr50,0000.0100,00028Bambu kwalitas baik @ 3 m'21.000.021.00I.aLjr10,0000.0210,00029Besi Plat strip / Kawel / Baut24.000.024.00I.bKg10,0000.0240,00030Seng Talang BJLS 30, Lebar 60cm14.000.014.00I.bm'15,0000.0210,00031Genteng Karang Pilang2,145.000.02,145.00I.bm21,6000.03,432,00032Genteng Bubungan Karang Pilang44.000.044.00I.bm'4,0000.0176,00033Pintu PVC1.000.01.00I.bunit325,0000.0325,00034Kaca Bening 5 mm10.000.010.00I.bm280,0000.0800,00035Keramik 40x40 warna motif65.000.065.00I.bDos40,0000.02,600,00036Keramik 20/20 KM/WC6.000.06.00I.bDos35,0000.0210,00037Keramik dinding 20/25 KM/WC12.000.012.00I.bDos37,5000.0450,00039Playwood tbl 4 mm, 1.20 x 2.40 m (Langit-langit)56.060.056.06I.bLbr50,0000.02,802,80040Plamir Tembok55.000.055.00I.bKg20,0000.01,100,00041Plamir Kayu4.000.04.00I.bKg17,5000.070,00042Cat Tembok198.000.0198.00I.bKg18,0000.03,564,00043Cat Kayu11.000.011.00I.bKg43,0000.0473,00044Cat Meni Kayu Setara Pedang5.000.05.00I.bKg20,0000.0100,00045Thinner1.000.01.00I.bltr17,5000.017,50046Kertas Gosok / amplas40.000.040.00I.blbr3,0000.0120,00047Kunci tanam Pintu 1 x Putar4.000.04.00I.bstel70,0000.0280,00048Engsel Pintu6.000.06.00I.bstel15,0000.090,00049Engsel Jendela12.000.012.00I.bstel10,0000.0120,00050Grendel Jendela6.000.06.00I.bstel7,0000.042,00051Hak Angin6.000.06.00I.bstel13,5000.081,00053Pipa PVC 3"5.000.05.00I.bLjr16,0000.080,00054Kran air 1/2"3.000.03.00I.bunit6,0000.018,00055Floor drain1.000.01.00I.bunit12,5000.012,50056Klosed Jongkok1.000.01.00I.bunit120,0000.0120,00057Kabel NYA 1 x 2.5 mm133.000.0133.00I.bm'8,0000.01,064,00058Pipa Paralon 5/8"3.000.03.00I.bLjr8,0000.024,00059Isolator8.000.08.00I.bbh4,8000.038,40060Las Dop8.000.08.00I.bbh5000.04,000URAIANVolumeKategori BiayaSatuanHarga Satuan (Rp )Jumlah Swadaya ( Rp )Jumlah PNPM-MPd ( Rp )TotalSwadayaDana PNPM-MP61Fiiting Plafond8.000.08.00I.bbh10,5000.084,00062T. Dos PVC13.000.013.00I.bbh1,5000.019,50063Saklar ganda1.000.01.00I.bbh25,0000.025,00064Saklar tunggal6.000.06.00I.bbh25,0000.0150,00065Stop Kontak5.000.05.00I.bbh20,0000.0100,00066Panel Box1.000.01.00I.bSet260,0000.0260,00067MCB 10 AMP1.000.01.00I.bbh75,0000.075,00068Miniswitch 32 AMP1.000.01.00I.bbh30,0000.030,00069Lampu SL 18 Watt6.000.06.00I.bbh65,0000.0390,00070Lampu Pijar 10 Watt2.000.02.00I.bbh40,0000.080,00071Sanyo1.000.01.00I.bbh250,0000.0250,00072Beton alur / garis9.000.09.00I.bm280,0000.0720,00073Papan informasi kegaiatan1.000.01.00I.bm2100,0000.0100,00074Papan nama kegiatan / proyek1.000.01.00I.bm2250,0000.0250,00075Prasasti1.000.01.00I.bm2400,0000.0400,000Sub Total 1 )$5,620,000$87,687,3002. PERALATAN1Meteran-5 M1.001.000.0II.bBuah12,500$12,5000.02Benang5.005.000.0II.bRoll10,000$50,0000.03Slang15.0015.000.0II.bM10,000$150,0000.04Cangkul4.004.000.0II.bBuah25,000$100,0000.05Sekop2.002.000.0II.bBuah15,000$30,0000.06Palu - 2 Kg4.004.000.0II.bBuah25,000$100,0000.07Cetok4.004.000.0II.bBuah10,000$40,0000.08Ondrong4.004.000.0II.bBuah15,000$60,0000.09Ember25.0025.000.0II.bBuah7,500$187,5000.0LUAS RUANG=73.50LUAS KM/WC=0.0Sub Total 2)$730,0000TOTAL LUAS=73.503. UPAH1Pekerja684.00273.00411.00III.aHOK$30,000$8,190,000$12,330,000TOTAL HARGA=115,917,3002Tukang484.0060.00424.00III.aHOK$37,500$2,250,000$15,900,0001168333835Sub Total 3)$10,440,000$28,230,000HARGA Per Meter2=1,577,106TOTAL BIAYA$16,790,000$115,917,300Sumber DanaPNPM-MP115,917,300Besaran SwadayaDAFTAR swadaya tenaga kerjaSwadaya16,790,00012.65%- Pekerjaan bouplankTotal132,707,300$1,805,541- Pekerjaan pasang pondasi$21- Pengecoran beton plat atap terasDisetujui :Dibuat Oleh :- Pembuatan SepticktankPjOK Kec. SingojuruhFasilitator KecamatanKader Teknik- Pembuatan resapan..............................................................Yusron Bastian, SABApa MerekaNIP. .................................FTFK

&L&"-,Italic"&12PNPM Mandiri Perdesaan Tahun 2010

2. RAB-PagarRENCANA ANGGARAN BIAYAPropinsi:Jawa TimurNo. RAB :02/Pgr/2012Kabupaten:BanyuwangiProgram :PNPM - MPdKecamatan:TegaldlimoJenis Kegiatan :Pemb. Pagar dan Papan NamaDesa:PurwoasriUkuran / Dimensi :1.5 x 23.5 mURAIANVolumeKategori BiayaSatuanHarga Satuan (Rp )Jumlah Swadaya ( Rp )Jumlah PNPM-MPd ( Rp )TotalSwadayaDana PNPM-MP1. BAHAN1Pasir Pasang/Cor7.000.07.00I.am390,0000.0630,0002Batu Kali/Gunung/Gebal10.000.010.00I.am385,0000.0850,0003Semen PC 50 Kg39.000.039.00I.asak52,0000.02,028,0004Batu Bata/merah2,398.000.02,398.00I.abh4500.01,079,1005Plamir Tembok2.000.02.00I.aKg20,0000.040,0006Cat Tembok7.000.07.00I.bKg18,0000.0126,0007Kertas Gosok / amplas1.000.01.00I.blbr3,0000.03,0008Pagar Besi Kotak1.000.01.00I.bUnit1,280,9000.01,280,900Sub Total 1 )0.0$6,037,0002. PERALATAN1Benang2.002.000.0II.bRoll10,000$20,0000.02Cangkul2.002.000.0II.bBuah25,000$50,0000.03Sekop1.001.000.0II.bBuah15,000$15,0000.04Cetok2.002.000.0II.bBuah10,000$20,0000.05Ondrong2.002.000.0II.bBuah15,000$30,0000.06Ember10.0010.000.0II.bBuah7,500$75,0000.0Sub Total 2)$210,00003. UPAH1Pekerja87.000.087.00III.aHOK$30,0000.0$2,610,0002Tukang36.000.036.00III.aHOK$37,5000.0$1,350,0001230123Sub Total 3)0.0$3,960,000TOTAL BIAYA$210,000$9,997,000Sumber DanaPNPM-MP9,997,000Besaran SwadayaSwadaya210,0002.06%Swadaya Uang0Total10,207,000Disetujui :Dibuat Oleh :PjOK Kec. SingojuruhFasilitator KecamatanKader Teknik..............................................................Yusron Bastian, SABApa MerekaNIP. .................................FTFK

&L&"-,Italic"&12PNPM Mandiri Perdesaan Tahun 2010

3. RAB-PavingRENCANA ANGGARAN BIAYAPropinsi:Jawa TimurNo. RAB :03/Pvg/2012Kabupaten:BanyuwangiProgram :PNPM - MPdKecamatan:TegaldlimoJenis Kegiatan :Pas. Paving Halaman SekolahDesa:PurwoasriUkuran / Dimensi :3 x 16.05 mURAIANVolumeKategori BiayaSatuanHarga Satuan (Rp )Jumlah Swadaya ( Rp )Jumlah PNPM-MPd ( Rp )TotalSwadayaDana PNPM-MP1. BAHAN1Pasir Urug5.000.05.00I.am365,0000.0325,0002Paving Stone Abu - abu Tebal = 6 cm48.000.048.00I.am245,0000.02,160,000Sub Total 1 )0.0$2,485,0002. PERALATAN1Benang4.004.000.0II.bRoll10,000$40,0000.02Palu - 2 Kg2.002.000.0II.bBuah25,000$50,0000.03Ember10.0010.000.0II.bBuah7,500$75,0000.0Sub Total 2)$165,00003. UPAH1Pekerja8.000.08.00III.aHOK$30,0000.0$240,0002Tukang19.000.019.00III.aHOK$37,5000.0$712,50027027Sub Total 3)0.0$952,500TOTAL BIAYA$165,000$3,437,500Sumber DanaPNPM-MP3,437,500Besaran SwadayaSwadaya165,0004.58%Swadaya Uang0Total3,602,500Disetujui :Dibuat Oleh :PjOK Kec. SingojuruhFasilitator KecamatanKader Teknik..............................................................Yusron Bastian, SABApa MerekaNIP. .................................FTFK

&L&"-,Italic"&12PNPM Mandiri Perdesaan Tahun 2010

4. RAB-MeubelairRENCANA ANGGARAN BIAYAPropinsi:Jawa TimurNo. RAB :04/Mbl/2012Kabupaten:BanyuwangiProgram :PNPM - MPdKecamatan:TegaldlimoJenis Kegiatan :Pengadaan MeubelairDesa:PurwoasriUkuran / Dimensi :URAIANVolumeKategori BiayaSatuanHarga Satuan (Rp )Jumlah Swadaya ( Rp )Jumlah PNPM-MPd ( Rp )TotalSwadayaDana PNPM-MP1. BAHAN1Meja siswa26.000.026.00I.aBh200,0000.05,200,0002Kursi siswa52.000.052.00I.aBh50,0000.02,600,0003Meja guru5.000.05.00I.aBh250,0000.01,250,0004Kursi guru5.000.05.00I.aBh100,0000.0500,0005Almari3.000.03.00I.aBh750,0000.02,250,000Sub Total 1 )0.0$11,800,0002. PERALATANSub Total 2)0.00.03. UPAH000Sub Total 3)0.00.0TOTAL BIAYA0.0$11,800,000Sumber DanaPNPM-MP11,800,000Besaran SwadayaSwadaya00.0%Swadaya Uang0Total11,800,000Disetujui :Dibuat Oleh :PjOK Kec. SingojuruhFasilitator KecamatanKader Teknik..............................................................Yusron Bastian, SABApa MerekaNIP. .................................FTFK

&L&"-,Italic"&12PNPM Mandiri Perdesaan Tahun 2010

TOS-GedungTAKE OFF SHEETDesa:PurwoasriKecamatan:TegaldlimoKabupaten:BanyuwangiSub Kegiatan:GEDUNG POSKESDESSKETSAPERHITUNGAN1.Pekerjaan BouplankPERHITUNGAN VOLUMEPanjang BangunanSat58.00mBAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatKayu Usuk 5/70.01258.005LjrTukang0.11.3358.008.00HOKSirap Randu 2/200.00758.0010LjrPekerja0.11.3358.008.00HOKPaku0.0258.001.00KgHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume58.00Kayu Usuk 5/75Ljr14,00070,000Harga Sat. Pekerjaan$705,000Sirap Randu 2/2010Ljr8,00080,000HARGA SATUAN PELAKSANAANPaku1Kg15,00015,000Tukang8.00HOK37,500300,00012,155.17/ m'Pekerja8.00HOK30,000240,000Total Harga Satuan Pekerjaan$705,0002Pekerjaan Galian Tanah PondasiPERHITUNGAN VOLUMETtKJenis Galian PondasiPanjang (P)Lebar (L)Tinggi (H)Volumem'm'm'm3IGalian Pondasi biasa < 1 m'58.001.001.0058.00H0.00.0Jumlah Volume58.00BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsat---0.0-Tukang01.3358.000.0HOKL---0.0-Pekerja0.751.3358.0058.00HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume58.00-0.0-0.00.0Harga Sat. Pekerjaan$1,740,000-0.0-0.00.0HARGA SATUAN PELAKSANAAN-0.0-0.00.0Tukang0.0HOK37,5000.030,000.00/ m3Pekerja58.00HOK30,0001,740,000Total Harga Satuan Pekerjaan$1,740,0003Pekerjaan Urugan PasirPERHITUNGAN VOLUMETtKJenis UruganPanjang (P)Lebar (L)Tinggi (H)Volumem'm'm'm3IUrugan pasir bawah pondasi58.001.000.052.90IIUrugan Pasir bawah lantai10.006.000.053.000.00.00.0Jumlah Volume5.90BAHANTENAGA KERJAHRincianKoefVolJmlsatRincianKoefKonvVolJmlsatPasir Urug1.205.907.00m3Tukang01.335.900.0HOKL-0.00.00.0-Pekerja0.31.335.902.00HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume5.90Pasir Urug7.0m365,000455,000Harga Sat. Pekerjaan$515,000-0.0-0.00.0HARGA SATUAN PELAKSANAAN-0.0-0.00.0Tukang0.0HOK37,5000.087,288.14/ m3Pekerja2.00HOK30,00060,000Total Harga Satuan Pekerjaan$515,000SKETSAPERHITUNGAN4Pekerjaan AanstampingPERHITUNGAN VOLUMETtKJenis PekerjaanPanjang (P)Lebar (L)Tinggi (H)Volumem'm'm'm3IPasang Aanstamping Bawah Pondasi58.001.000.158.700.00.0Jumlah Volume8.70BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatPasir Urug0.308.703.00m3Tukang0.391.338.705.00HOKBatu Gebal1.208.7010.00m3Pekerja0.781.338.709.00HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume8.70Pasir Urug3.0m365,000195,000Harga Sat. Pekerjaan$1,045,000Batu Gebal10.0m385,000850,000HARGA SATUAN PELAKSANAAN-0.0-0.00.0Tukang5.00HOK0.00.0120,114.94/ m3Pekerja9.00HOK0.00.0Total Harga Satuan Pekerjaan$1,045,0005Pekerjaan Pondasi 1 : 5PERHITUNGAN VOLUMETtKJenis PekerjaanLebar Atas (L1)Lebar Bawah (L2)Tinggi (H)Panjang (P)Volumem'm'm'm'm3IPasang Pondasi0.300.800.8058.0025.520.00.0Jumlah Volume25.52BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatBatu Gebal1.2025.5231.00m3Tukang0.61.3325.5220.00HOKPasir Pasang0.5425.5214.00m3Pekerja1.51.3325.5251.00HOKSemen PC @40 Kg3.4025.5287.00zakHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume25.52Batu Gebal31.0m385,0002,635,000Harga Sat. Pekerjaan$10,699,000Pasir Pasang14.0m390,0001,260,000HARGA SATUAN PELAKSANAANSemen PC @40 Kg87.0zak52,0004,524,000Tukang20.00HOK37,500750,000419,239.81/ m3Pekerja51.00HOK30,0001,530,000Total Harga Satuan Pekerjaan$10,699,0006Pekerjaan Urugan Sirtu Bawah BangunanPERHITUNGAN VOLUMETtKJenis PekerjaanPanjang (P)Lebar (L)Tinggi (H)Volumem'm'm'm3IUrugan sirtu bawah bangunan10.006.000.3521.00Jumlah Volume21.00BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatSirtu1.2021.0025.00m3Tukang01.3321.000.0HOKPekerja0.251.3321.007.00HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume21.00Sirtu25.0m375,0001,875,000Harga Sat. Pekerjaan$2,085,000HARGA SATUAN PELAKSANAANTukang0.0HOK37,5000.099,285.71/ m3Pekerja7.00HOK30,000210,000Total Harga Satuan Pekerjaan$2,085,0007Pekerjaan Beton1PERHITUNGAN BETON1Beton Sloof 15/202Kolom Praktis 15/153Kolom Utama 15/204Ringbalk 15/155Ring Gewel 15/156Balok Teras 15/207Balok Tandon 15/308Beton Plat atap + Lantai Tandon tbl = 8 cmSKETSAPERHITUNGAN1Perhitungan Beton Sloof 15/201Perhitungan Beton Sloof 15/20PERHITUNGAN VOLUMEBerat Besi BetonTtKJenis PekerjaanDimensi BetonPanjang (P)Volumekg/mkg/ljrm'm360.222.42IBeton Sloof 15/200.150.2058.001.7480.404.35100.626.79Keterangan :120.899.77Jumlah tulangan=4.00Bh161.5817.36Jarak antar begel=0.15m192.2324.49BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatBatu Pecah 2/30.811.741.00m3Tukang batu1.201.331.743.00HOKPasir Pasang0.521.741.00m3Pekerja batu3.601.331.748.00HOKSemen PC @40 Kg5.801.7410.00zakTukang besi0.0101.331.744.00HOKBesi 61.0526.00ljrPekerja besi0.0101.331.744.00HOKBesi 101.0521.00ljrTukang kayu0.261.331.741.00HOKBendrat0.0154.00kgPekerja kayu0.521.331.741.00HOKKayu bksting 2/31.052.00btgPapan bksting 2/201.058.00lbrPaku0.401.741.00kgHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume1.74Batu Pecah 2/31.0m3125,000125,000Harga Sat. Pekerjaan$3,652,000Pasir Pasang1.0m390,00090,000HARGA SATUAN PELAKSANAANSemen PC @40 Kg10.0zak52,000520,000Besi 626.0ljr26,000676,0002,098,850.57/ m3Besi 1021.0ljr67,0001,407,000Bendrat4.0kg15,00060,000Kayu bksting 2/32.0btg2,5005,000Papan bksting 2/208.0lbr8,00064,000Paku1.0kg15,00015,000Besi BetonTukang8.00Hok37,500300,000154.05kg/m3Pekerja13.00Hok30,000390,000Total Harga Satuan Pekerjaan$3,652,0002Perhitungan Kolom Praktis 15/152Perhitungan Kolom Praktis 15/15PERHITUNGAN VOLUMEBerat Besi BetonA=17BhTtKJenis PekerjaanDimensi BetonTinggi KolomJumlahVolumekg/mkg/ljrm'Bhm360.222.42IKolom Praktis 15/150.150.153.6017.001.3880.404.35100.626.79Keterangan :120.899.77Jumlah tulangan=4.00m161.5817.36Jarak antar begel=0.15m192.2324.49BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatBatu Pecah 2/30.811.381.00m3Tukang batu0.251.331.380.0HOKPasir Pasang0.521.381.00m3Pekerja batu1.651.331.383.00HOKSemen PC @40 Kg5.801.388.00zakTukang besi0.0101.331.384.00HOKBesi 61.0524.00ljrPekerja besi0.0101.331.384.00HOKBesi 101.0524.00ljrTukang kayu0.261.331.380.0HOKBendrat0.0154.00kgPekerja kayu0.301.331.381.00HOKPapan bksting 2/201.058.00lbrPaku0.401.381.00kgHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume1.38Batu Pecah 2/31.0m3125,000125,000Harga Sat. Pekerjaan$3,392,000Pasir Pasang1.0m390,00090,000HARGA SATUAN PELAKSANAANSemen PC @40 Kg8.0zak52,000416,000Besi 624.0ljr26,000624,0002,463,326.07/ m3Besi 1024.0ljr67,0001,608,000Bendrat4.0kg15,00060,000Papan bksting 2/208.0lbr8,00064,000Paku1.0kg15,00015,000Tukang4.00Hok37,500150,000Besi BetonPekerja8.00Hok30,000240,000212.43kg/m3Total Harga Satuan Pekerjaan$3,392,0003Perhitungan Kolom Utama 15/203Perhitungan Kolom Utama 15/20PERHITUNGAN VOLUMEBerat Besi BetonTtKJenis PekerjaanDimensi BetonTinggi KolomJumlahVolumekg/mkg/ljrm'Bhm360.222.42IKolom Utama 15/200.150.203.601.000.1180.404.35100.626.79Keterangan :120.899.77Jml Tul Besi 12=4.00m161.5817.36Jarak antar begel=0.15m192.2324.49SKETSAPERHITUNGANB=1BhBAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatBatu Pecah 2/30.810.110.0m3Tukang batu0.251.330.110.0HOKPasir Pasang0.520.110.0m3Pekerja batu1.651.330.110.0HOKSemen PC @40 Kg5.800.111.00zakTukang besi0.0101.330.110.0HOKBesi 61.052.00ljrPekerja besi0.0101.330.110.0HOKBesi 101.051.00ljrTukang kayu0.261.330.110.0HOKBendrat0.0150.0kgPekerja kayu0.301.330.110.0HOKKayu bksting 5/71.051.00btgPapan bksting 2/201.050.0lbrPaku Usuk0.400.110.0kgHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume0.11Batu Pecah 2/30.0m3125,0000.0Harga Sat. Pekerjaan$185,000Pasir Pasang0.0m390,0000.0HARGA SATUAN PELAKSANAANSemen PC @40 Kg1.0zak52,00052,000Besi 62.0ljr26,00052,0001,712,962.96/ m3Besi 101.0ljr67,00067,000Bendrat0.0kg15,0000.0Kayu bksting 5/71.0btg14,00014,000Papan bksting 2/200.0lbr8,0000.0Paku Usuk0.0kg15,0000.0Besi BetonTukang0.0Hok37,5000.0135.26kg/m3Pekerja0.0Hok30,0000.0Total Harga Satuan Pekerjaan$185,0004Perhitungan Ringbalk 15/154Perhitungan Ringbalk 15/15PERHITUNGAN VOLUMEBerat Besi BetonTtKJenis PekerjaanDimensi BetonPanjang (P)Volumekg/mkg/ljrm'm360.222.42IBeton Ringbalk 15/150.150.1554.501.2380.404.35100.626.79Keterangan :120.899.77Jumlah tulangan=4.00m161.5817.36Jarak antar begel=0.15m192.2324.49BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatBatu Pecah 2/30.811.231.00m3Tukang batu0.251.331.230.0HOKPasir Pasang0.521.231.00m3Pekerja batu1.651.331.233.00HOKSemen PC @40 Kg5.801.237.00zakTukang besi0.0101.331.233.00HOKBesi 61.0521.00ljrPekerja besi0.0101.331.233.00HOKBesi 101.0520.00ljrTukang kayu0.261.331.230.0HOKBendrat0.0154.00kgPekerja kayu0.301.331.230.0HOKKayu bksting 2/31.052.00btgPapan bksting 2/201.057.00lbrPaku0.401.230.0kgHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume1.23Batu Pecah 2/31.0m3125,000125,000Harga Sat. Pekerjaan$2,878,500Pasir Pasang1.0m390,00090,000HARGA SATUAN PELAKSANAANSemen PC @40 Kg7.0zak52,000364,000Besi 621.0ljr26,000546,0002,347,400.61/ m3Besi 1020.0ljr67,0001,340,000Bendrat4.0kg15,00060,000Kayu bksting 2/32.0btg2,5005,000Papan bksting 2/207.0lbr8,00056,000Paku0.0kg15,0000.0Besi BetonTukang3.00Hok37,500112,500200.76kg/m3Pekerja6.00Hok30,000180,000Total Harga Satuan Pekerjaan$2,878,5005Perhitungan Ring gewel 15/155Perhitungan Ring gewel 15/15PERHITUNGAN VOLUMEBerat Besi BetonTtKJenis PekerjaanDimensi BetonPanjang (P)JumlahVolumekg/mkg/ljrm'Gewelm360.222.42IRing gewel 15/150.150.157.402.000.3380.404.35100.626.79Keterangan :120.899.77Jumlah tulangan=4.00m161.5817.36Jarak antar begel=0.15m192.2324.49SKETSAPERHITUNGANBAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatBatu Pecah 2/30.810.330.0m3Tukang batu0.251.330.330.0HOKPasir Pasang0.520.330.0m3Pekerja batu1.651.330.331.00HOKSemen PC @40 Kg5.800.332.00zakTukang besi0.0101.330.331.00HOKBesi 61.053.00ljrPekerja besi0.0101.330.331.00HOKBesi 101.055.00ljrTukang kayu0.261.330.330.0HOKBendrat0.0151.00kgPekerja kayu0.301.330.330.0HOKKayu bksting 2/31.051.00btgPapan bksting 2/201.052.00lbrPaku0.400.330.0kgHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume0.33Batu Pecah 2/30.0m3125,0000.0Harga Sat. Pekerjaan$648,000Pasir Pasang0.0m390,0000.0HARGA SATUAN PELAKSANAANSemen PC @40 Kg2.0zak52,000104,000Besi 63.0ljr26,00078,0001,945,945.95/ m3Besi 105.0ljr67,000335,000Bendrat1.0kg15,00015,000Kayu bksting 2/31.0btg2,5002,500Papan bksting 2/202.0lbr8,00016,000Paku0.0kg15,0000.0Besi BetonTukang1.00Hok37,50037,500168.47kg/m3Pekerja2.00Hok30,00060,000Total Harga Satuan Pekerjaan$648,0006Perhitungan Balok Teras 15/206Perhitungan Balok Teras 15/20PERHITUNGAN VOLUMEBerat Besi BetonTtKJenis PekerjaanDimensi BetonPanjang (P)Volumekg/mkg/ljrm'm360.222.42IBalok Teras 15/200.150.204.500.1480.404.35100.626.79Keterangan :120.899.77Jumlah tulangan=5.00m161.5817.36Jarak antar begel=0.15m192.2324.49BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatBatu Pecah 2/30.810.140.0m3Tukang batu0.251.330.140.0HOKPasir Pasang0.520.140.0m3Pekerja batu1.651.330.140.0HOKSemen PC @40 Kg5.800.141.00zakTukang besi0.0101.330.140.0HOKBesi 61.052.00ljrPekerja besi0.0101.330.140.0HOKBesi 101.052.00ljrTukang kayu0.261.330.140.0HOKBendrat0.0150.0kgPekerja kayu0.301.330.140.0HOKKayu bksting 2/31.050.0btgKayu bksting 5/71.05(4.00)btgPapan bksting 2/201.051.00lbrPaku0.400.140.0kgHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume0.14Batu Pecah 2/30.0m3125,0000.0Harga Sat. Pekerjaan$190,000Pasir Pasang0.0m390,0000.0HARGA SATUAN PELAKSANAANSemen PC @40 Kg1.0zak52,00052,000Besi 62.0ljr26,00052,0001,407,407.41/ m3Besi 102.0ljr67,000134,000Bendrat0.0kg15,0000.0Kayu bksting 2/30.0btg2,5000.0Kayu bksting 5/7(4.0)btg14,000(56,000)Papan bksting 2/201.0lbr8,0008,000Paku0.0kg15,0000.0Besi BetonTukang0.0Hok37,5000.0180.56kg/m3Pekerja0.0Hok30,0000.0Total Harga Satuan Pekerjaan$190,0007Perhitungan Balok Tandon 15/307Perhitungan Balok Tandon 15/30PERHITUNGAN VOLUMEBerat Besi BetonTtKJenis PekerjaanDimensi BetonPanjang (P)Volumekg/mkg/ljrm'm360.222.42IBalok Tandon 15/300.150.300.00.080.404.35100.626.79Keterangan :120.899.77Jumlah tulangan=5.00m161.5817.36Jarak antar begel=0.15m192.2324.49SKETSAPERHITUNGANBAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatBatu Pecah 2/30.810.00.0m3Tukang batu0.251.330.00.0HOKPasir Pasang0.520.00.0m3Pekerja batu1.651.330.00.0HOKSemen PC @40 Kg5.800.00.0zakTukang besi0.0101.330.00.0HOKBesi 61.050.0ljrPekerja besi0.0101.330.00.0HOKBesi 101.050.0ljrTukang kayu0.261.330.00.0HOKBendrat0.0150.0kgPekerja kayu0.301.330.00.0HOKKayu bksting 2/31.050.0btgKayu bksting 5/71.050.0btgPapan bksting 2/201.050.0lbrPaku0.400.00.0kgHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume0.0Batu Pecah 2/30.0m3125,0000.0Harga Sat. Pekerjaan0.0Pasir Pasang0.0m390,0000.0HARGA SATUAN PELAKSANAANSemen PC @40 Kg0.0zak52,0000.0Besi 60.0ljr26,0000.00.0/ m3Besi 100.0ljr67,0000.0Bendrat0.0kg15,0000.0Kayu bksting 2/30.0btg2,5000.0Kayu bksting 5/70.0btg14,0000.0Papan bksting 2/200.0lbr8,0000.0Paku0.0kg15,0000.0Besi BetonTukang0.0Hok37,5000.00.0kg/m3Pekerja0.0Hok30,0000.0Total Harga Satuan Pekerjaan0.08Perhitungan Plat Atap Beton, Tebal 8 cm8Perhitungan Plat Atap Beton, Tebal 8 cmPERHITUNGAN VOLUME PLAT BETON (TERAS)Berat Besi BetonTtKJenis PekerjaanLuas plat atap (m2)Tebal platVolumekg/mkg/ljrPjgLbrmm360.222.42IPlat Atap Beton3.502.000.080.5680.404.35100.626.79BAHAN120.899.77RincianKoefVolJmlsat161.5817.36Batu Pecah 2/30.810.560.0m3192.2324.49Pasir Pasang0.520.560.0m3Semen PC @40 Kg5.800.563.00zakTENAGA KERJABesi 81.0513.00ljrRincianKoefKonvVolJmlsatBendrat0.0150.0kgTukang batu0.251.330.560.0HOKTriplek tebal 4 mm0.352.00LbrPekerja batu1.651.330.561.00HOKBambu @3 m6.0021.00btgTukang besi0.0101.330.561.00HOKKayu bksting 5/70.0152.00btgPekerja besi0.0101.330.561.00HOKPapan bksting 2/200.044.00lbrTukang kayu0.261.330.560.0HOKPaku0.400.560.0kgPekerja kayu0.301.330.560.0HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume0.56Batu Pecah 2/30.0m3125,0000.0Harga Sat. Pekerjaan$1,156,500Pasir Pasang0.0m390,0000.0HARGA SATUAN PELAKSANAANSemen PC @40 Kg3.0zak52,000156,000Besi 813.0ljr41,000533,0002,065,178.57/ m3Bendrat0.0kg15,0000.0Triplek tebal 4 mm2.0Lbr50,000100,000Bambu @3 m21.0btg10,000210,000Kayu bksting 5/72.0btg14,00028,000Papan bksting 2/204.0lbr8,00032,000Paku0.0kg15,0000.0Tukang1.00Hok37,50037,500Besi BetonPekerja2.00Hok30,00060,000100.87kg/m3Total Harga Satuan Pekerjaan$1,156,5008Pekerjaan Kusen dan Daunan1Perhitungan Kusen dan Daunan Pintu Panil KayuTypeP-1=1BhPintuPERHITUNGAN VOLUME KUSENBAHANTypeJumlahTinggiLebarVolumeRincianKoefVolJmlsatBhmmm3Kayu meranti 6/151.100.093LjrP-11.004.121.520.09Kayu slimar 3/200.0322.634LjrPERHITUNGAN VOLUME DAUNANTENAGA KERJATypeJumlahTinggiLebarVolumeRincianKoefKonvVolJmlsat2.00Bhmmm2Tukang Kusen18.001.330.092.00HOKP-11.002.121.242.63Pekerja Kusen6.001.330.091.00HOKTukang Daunan2.501.332.639.00HOKPekerja Daunan1.001.332.633.00HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahHARGA SATUAN PEKERJAAN KUSENKayu meranti 6/153.0Ljr155,000465,000570,000.00/ Unit kusen pintuKayu slimar 3/204.0Ljr102,000408,000Tukang11.00HOK37,500412,500HARGA SATUAN PEKERJAAN DAUNAN0.600.60Pekerja4.00HOK30,000120,000835,500.00/ Unit daun pintuTotal Harga Satuan Pekerjaan$1,405,5008Pekerjaan Kusen dan Daunan1Perhitungan Kusen dan Daunan Pintu Panil KayuTypeP-2=3BhPintuPERHITUNGAN VOLUME KUSENBAHANTypeJumlahTinggiLebarVolumeRincianKoefVolJmlsatBhmmm3Kayu meranti 6/151.100.258LjrP-23.004.121.120.25Kayu slimar 3/200.0325.347LjrPERHITUNGAN VOLUME DAUNANTENAGA KERJATypeJumlahTinggiLebarVolumeRincianKoefKonvVolJmlsat2.00Bhmmm2Tukang Kusen18.001.330.256.00HOKP-23.002.120.845.34Pekerja Kusen6.001.330.252.00HOKTukang Daunan2.501.335.3418.00HOKPekerja Daunan1.001.335.347.00HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahHARGA SATUAN PEKERJAAN KUSENKayu meranti 6/158.0Ljr50,000400,000133,333.33/ Unit kusen pintuKayu slimar 3/207.0Ljr20,000140,000Tukang24.00HOK0.00.0HARGA SATUAN PEKERJAAN DAUNAN0.80Pekerja9.00HOK0.00.046,666.67/ Unit daun pintuTotal Harga Satuan Pekerjaan$540,000SKETSAPERHITUNGANTypeJ1=2BhJendelaPERHITUNGAN VOLUME KUSENBAHANTypeJumlahTinggiLebarVolumeRincianKoefVolJmlsatBhmmm3Kayu meranti 6/151.200.103LjrJ12.003.841.440.10Kayu slimar 3/80.0350.733LjrKaca polos 5 mm1.101.532m2PERHITUNGAN VOLUME DAUNANTypeJumlahTinggiLebarVolumeTENAGA KERJABhmmm2RincianKoefKonvVolJmlsat1.80J12.003.680.880.73Tukang Kusen18.001.330.102.00HOKPekerja Kusen6.001.330.101.00HOKPERHITUNGAN VOLUME KACATukang Daunan2.001.330.732.00HOKTypeJumlahTinggiLebarVolumePekerja Daunan0.801.330.731.00HOKBhmmm2Tukang Pasang Kaca0.301.331.531.00HOKJ12.001.820.421.53Pekerja Pasang Kaca0.031.331.530.0HOKHARGA SATUAN PEKERJAANRincianJmlsatHarga SatJumlahKETERANGAN0.40Kayu meranti 6/153.0Ljr155,000465,000HARGA SATUAN PELAKSANAAN KUSENKayu slimar 3/83.0Ljr40,000120,000285,000.00/ Unit kusen pintuKaca polos 5 mm2.0m280,000160,000Tukang5.00HOK37,500187,500HARGA SATUAN PELAKSANAAN DAUNANPekerja2.00HOK30,00060,000211,250.00/ Unit daun jendela + kacaTotal Harga Satuan Pekerjaan$992,500TypeJ2=4BhJendelaPERHITUNGAN VOLUME KUSENBAHANTypeJumlahTinggiLebarVolumeRincianKoefVolJmlsatBhmmm3Kayu meranti 6/151.200.2910LjrJ24.004.983.040.29Kayu slimar 3/80.0351.807LjrKaca polos 5 mm1.107.618m2PERHITUNGAN VOLUME DAUNANTypeJumlahTinggiLebarVolumeTENAGA KERJABhmmm2RincianKoefKonvVolJmlsat1.54J24.003.162.481.80Tukang Kusen18.001.330.297.00HOKPekerja Kusen6.001.330.292.00HOKPERHITUNGAN VOLUME KACATukang Daunan2.001.331.805.00HOKTypeJumlahTinggiLebarVolumePekerja Daunan0.801.331.802.00HOKBhmmm2Tukang Pasang Kaca0.301.337.613.00HOKJ24.001.561.227.61Pekerja Pasang Kaca0.031.337.610.0HOKHARGA SATUAN PEKERJAAN1.20RincianJmlsatHarga SatJumlahKETERANGANKayu meranti 6/1510.0Ljr155,0001,550,000HARGA SATUAN PELAKSANAAN KUSENGanti gambar jendelaKayu slimar 3/87.0Ljr40,000280,000468,125.00/ Unit kusen pintuKaca polos 5 mm8.0m280,000640,000Tukang15.00HOK37,500562,500HARGA SATUAN PELAKSANAAN DAUNANPekerja4.00HOK30,000120,000320,000.00/ Unit daun jendela + kacaTotal Harga Satuan Pekerjaan$3,152,500TypeJ3=0BhJendelaPERHITUNGAN VOLUME KUSENBAHANTypeJumlahTinggiLebarVolumeRincianKoefVolJmlsatBhmmm3Kayu meranti 6/151.200.00.0LjrJ30.05.284.880.0Kayu slimar 3/80.0350.00.0LjrKaca polos 5 mm1.100.00.0m21.20PERHITUNGAN VOLUME DAUNANTypeJumlahTinggiLebarVolumeTENAGA KERJABhmmm2RincianKoefKonvVolJmlsatJ30.04.962.560.0Tukang Kusen18.001.330.00.0HOKPekerja Kusen6.001.330.00.0HOKPERHITUNGAN VOLUME KACATukang Daunan2.001.330.00.0HOK0.600.800.60TypeJumlahTinggiLebarVolumePekerja Daunan0.801.330.00.0HOKBhmmm2Tukang Pasang Kaca0.301.330.00.0HOKJ30.01.222.060.0Pekerja Pasang Kaca0.031.330.00.0HOKHARGA SATUAN PEKERJAANRincianJmlsatHarga SatJumlahKETERANGANKayu meranti 6/150.0Ljr155,0000.0HARGA SATUAN PELAKSANAAN KUSENKayu slimar 3/80.0Ljr40,0000.00.0/ Unit kusen pintuKaca polos 5 mm0.0m280,0000.0Tukang0.0HOK37,5000.0HARGA SATUAN PELAKSANAAN DAUNANPekerja0.0HOK30,0000.00.0/ Unit daun jendela + kacaTotal Harga Satuan Pekerjaan0.0SKETSAPERHITUNGANTypeBV=2BhPERHITUNGAN VOLUME KUSENBAHANTypeJumlahTinggiLebarVolumeRincianKoefVolJmlsatBhmmm3Kayu meranti 6/151.200.041Ljr0.30BV2.000.841.640.04Kaca polos 5 mm1.100.280.0m2PERHITUNGAN VOLUME KACATENAGA KERJATypeJumlahTinggiLebarVolumeRincianKoefKonvVolJmlsatBhmmm2Tukang Kusen18.001.330.041.00HOK0.50BV2.000.270.520.28Pekerja Kusen6.001.330.040.0HOKTukang Pasang Kaca0.301.330.280.0HOKPekerja Pasang Kaca0.031.330.280.0HOKHARGA SATUAN PEKERJAANRincianJmlsatHarga SatJumlahKayu meranti 6/151.0Ljr155,000155,000Kaca polos 5 mm0.0m280,0000.0KETERANGANTukang1.00HOK37,50037,500HARGA SATUAN PELAKSANAAN KUSENPekerja0.0HOK30,0000.096,250.00/ Unit BVTotal Harga Satuan Pekerjaan$192,500TypePVC=1BhHARGA SATUAN PEKERJAANRincianJmlsatHarga SatJumlahPintu PVC1.0Bh325,000325,000Total Harga Satuan Pekerjaan$325,0002.10Roster beton topi=0Unit( 1 Unit=3Bh)HARGA SATUAN PEKERJAANRRincianJmlsatHarga SatJumlahRoster beton topi0.0Bh12,0000.00.18Total Harga Satuan Pekerjaan0.00.700.409Pekerjaan Pasangan Tembok Camp. 1 Pc : 5 PsPERHITUNGAN VOLUMEPERHITUNGAN LUAS KUSENTtKJenis PekerjaanPanjangTinggiVolumeTypePanjangLebarVolm'm'm2m'm'm2IPasangan bata merah dinding52.503.60173.40P-12.161.322.85IIPasangan bata merah Gewel6.001.7010.20J11.920.522.00IIIPasangan bata merah ornamen36.73J21.661.328.76IVPas. bata merah KM/WC + Tandon3.91J31.322.240.0Jumlah Volume224.24BV0.420.620.52PVC0.702.101.47R0.180.400.0BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatBata merah70.00224.2415,697bhTukang0.101.33224.2430.00HOKPasir Pasang0.045224.2410.00m3Pekerja0.301.33224.2489.00HOKSemen PC @40 Kg0.193224.2443.00zakHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume224.24Bata merah15,697bh4507,063,700Harga Sat. Pekerjaan$13,994,700Pasir Pasang10.0m390,000900,000HARGA SATUAN PELAKSANAANSemen PC @40 Kg43.0zak52,0002,236,000Tukang30.00HOK37,5001,125,00062,410.47/ m2Pekerja89.00HOK30,0002,670,000Total Harga Satuan Pekerjaan$13,994,70010Pekerjaan PlesteranPERHITUNGAN VOLUMETtKJenis PekerjaanVol Pas Bt merahLuas untukVolumeKETERANGAN :m2Luar & Dalamm2Luasan Volume Pekerjaan PlesteranIPasangan bata merah dinding173.402.00346.79adalah 2 x Luas Vol Pas. Bata merahIIPasangan bata merah Gewel10.202.0020.40IIIPasangan bata merah ornamen36.732.0073.46IVPas. bata merah KM/WC + Tandon3.912.007.82Jumlah Volume448.47BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatPasir Pasang0.026448.4712.00m3Tukang0.151.33448.4790.00HOKSemen PC @40 Kg0.104448.4747.00zakPekerja0.301.33448.47179.00HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume448.47Pasir Pasang12.0m390,0001,080,000Harga Sat. Pekerjaan$12,269,000Semen PC @40 Kg47.0zak52,0002,444,000HARGA SATUAN PELAKSANAANTukang90.00HOK37,5003,375,00027,357.29/ m2Pekerja179.00HOK30,0005,370,000Total Harga Satuan Pekerjaan$12,269,000SKETSAPERHITUNGAN11Pekerjaan Rangka Atap1Pekerjaan Pas. Kuda-kuda 8/12 dan Gapit kuda - kuda 6/12PERHITUNGAN VOLUMEJenis PekerjaanUkuran kayu (m)Panjang (P)Volumem'm3Pasang Kuda-kuda dan skoor0.080.1282.800.79Pasang gapit kuda-kuda0.060.127.800.06Jumlah Volume0.85BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatKayu uk 8/121.1000.7923.00ljrTukang12.001.330.8514.00HOKKayu uk 6/121.1000.062.00ljrPekerja4.001.330.855.00HOKBesi kawel15.0000.8513.00kgPaku5.6000.855.00kgHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume0.85Kayu uk 8/1223.00ljr160,0003,680,000Harga Sat. Pekerjaan$4,805,000Kayu uk 6/122.00ljr122,500245,000HARGA SATUAN PELAKSANAANBesi kawel13.00kg10,000130,000Paku5.00kg15,00075,0005,646,033.09/ m3Tukang14.00HOK37,500525,000Pekerja5.00HOK30,000150,000Total Harga Satuan Pekerjaan$4,805,0002Pekerjaan Pasang Nok dan Gording 8/12PERHITUNGAN VOLUMEJenis PekerjaanUkuran kayu (m)Panjang (P)Volumem'm3Pasang Nok dan Gording0.080.1277.000.74Jumlah Volume0.74BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatKayu uk 8/121.1000.7421.00ljrTukang7.201.330.747.00HOKBaut15.0000.7411.00kgPekerja2.401.330.742.00HOKPaku3.0000.742.00kgHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume0.74Kayu uk 8/1221.00ljr160,0003,360,000Harga Sat. Pekerjaan$3,822,500Baut11.00kg10,000110,000HARGA SATUAN PELAKSANAANPaku2.00kg15,00030,000Tukang7.00HOK37,500262,5005,171,130.95/ m3Pekerja2.00HOK30,00060,000Total Harga Satuan Pekerjaan$3,822,5003Pekerjaan Pasang Usuk 5/7 dan Reng 2/3PERHITUNGAN VOLUMEJenis PekerjaanUkuran kayu (m)Panjang (P)Lebar DepanLebar BelakangVolumem'm'm'm2Pasang usuk0.050.0711.003.903.9085.80Pasang Reng0.020.0311.003.903.9085.80BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatKayu usuk 5/70.00885.8049ljrTukang0.101.3385.8011.00HOKKayu reng 2/30.00485.80143ljrPekerja0.101.3385.8011.00HOKPaku0.15085.8013.00kgHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume85.80Kayu usuk 5/749.00ljr56,0002,744,000Harga Sat. Pekerjaan$5,111,500Kayu reng 2/3143.00ljr10,0001,430,000HARGA SATUAN PELAKSANAANPaku13.00kg15,000195,000Tukang11.00HOK37,500412,50059,574.59/ m2Pekerja11.00HOK30,000330,000Total Harga Satuan Pekerjaan$5,111,500SKETSAPERHITUNGAN4Pekerjaan Pasang Papan Reuter 2/20PERHITUNGAN VOLUMEJenis PekerjaanUkuran kayu (m)Panjang (P)Volumem'm'Pasang papan Reuter0.020.2011.0011.00Jumlah Volume11.00BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatKayu Papan 2/200.00411.003.00ljrTukang0.151.3311.002.00HOKPaku0.00211.000.0kgPekerja0.0281.3311.000.0HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume11.00Kayu Papan 2/203.00ljr68,000204,000Harga Sat. Pekerjaan$279,000Paku0.0kg15,0000.0HARGA SATUAN PELAKSANAANTukang2.00HOK37,50075,00025,363.64/ m'Pekerja0.0HOK30,0000.0Total Harga Satuan Pekerjaan$279,0005Pekerjaan Pasang Listplank 3/20PERHITUNGAN VOLUMEJenis PekerjaanUkuran kayu (m)Panjang (P)Volumem'm'Pasang Listplank0.030.2037.6037.60Jumlah Volume37.60BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatKayu Papan 3/200.007237.6011.00ljrTukang0.201.3337.6010.00HOKPaku0.05037.602.00kgPekerja0.101.3337.605.00HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume37.60Kayu Papan 3/2011.00ljr102,0001,122,000Harga Sat. Pekerjaan$1,677,000Paku2.00kg15,00030,000HARGA SATUAN PELAKSANAANTukang10.00HOK37,500375,00044,601.06/ m'Pekerja5.00HOK30,000150,000Total Harga Satuan Pekerjaan$1,677,0006Pekerjaan Talang Seng BJLSPERHITUNGAN VOLUMEJenis PekerjaanPanjang (P)Volumem'm'Pasang Talang Karet BJLS 3014.0014.00Jumlah Volume14.00BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatTalang Karet BJLS 301.0314.0014.00m'Tukang0.601.3314.0011.00HOKPapan 2/200.00814.007.00btgPekerja0.051.3314.001.00HOKKayu 2/30.00214.0012.00btgPaku0.02014.000.0kgHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume14.00Talang Karet BJLS 3014.00m'15,000210,000Harga Sat. Pekerjaan$1,248,500Papan 2/207.00btg68,000476,000HARGA SATUAN PELAKSANAANKayu 2/312.00btg10,000120,000Paku0.0kg15,0000.089,178.57/ m'Tukang11.00HOK37,500412,500Pekerja1.00HOK30,00030,000Total Harga Satuan Pekerjaan$1,248,50012Pekerjaan Penutup Atap1Pekerjaan Pasang Genteng Karang PilangPERHITUNGAN VOLUMEJenis PekerjaanPanjang (P)Lebar DepanLebar BelakangVolumem'm'm'm2Pasang genteng karang pilang11.003.903.9085.80BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatGenteng Krg Pilang25.00085.802,145BhTukang0.0751.3385.809.00HOKPekerja0.151.3385.8017.00HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume85.80Genteng Krg Pilang2,145Bh1,6003,432,000Harga Sat. Pekerjaan$4,279,500Tukang9.00HOK37,500337,500HARGA SATUAN PELAKSANAANPekerja17.00HOK30,000510,00049,877.62/ m2Total Harga Satuan Pekerjaan$4,279,500SKETSAPERHITUNGAN2Pekerjaan Pasang Genteng Bubung Karang pilangPERHITUNGAN VOLUMEJenis PekerjaanPanjang (P)Volumem'm'Pasang Genteng Bubung Karang Pilang11.0011.00Jumlah Volume11.00BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatBubung Krg Pilang4.0011.0044.00BhTukang0.201.3311.003.00HOKPasir Pasang0.03211.000.0m3Pekerja0.401.3311.006.00HOKSemen PC @40Kg0.2011.002.00zakHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume11.00Bubung Krg Pilang44.00Bh4,000176,000Harga Sat. Pekerjaan$572,500Pasir Pasang0.0m390,0000.0HARGA SATUAN PELAKSANAANSemen PC @40Kg2.00zak52,000104,000Tukang3.00HOK37,500112,50052,045.45/ m'Pekerja6.00HOK30,000180,000Total Harga Satuan Pekerjaan$572,50013Pekerjaan Langit - Langit1Pekerjaan Langit - langitPERHITUNGAN VOLUMETtkJenis PekerjaanPanjang (P)Lebar (L)VolumeKETERANGAN :m'm'm2Langit - langit menggunakanIPas Langit - langit Ruang11.007.00154.00Playwood tebal 4 mm dan ukuran0.00.00.01.2x2.4mLuas =0.00.0Rangka Plafond memakai kayu Uk.Jumlah Volume154.000.04x0.06mBAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatPlaywood tbl 4 mm0.364154.0056.06lbrTukang0.401.33154.0082.00HOKKayu 4/60.023154.00369.00ljrPekerja0.271.33154.0055.00HOKPaku0.06154.009.00kgHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume154.00Playwood tbl 4 mm56.06lbr50,0002,802,800Harga Sat. Pekerjaan$22,422,800Kayu 4/6369.00ljr40,00014,760,000HARGA SATUAN PELAKSANAANPaku9.00kg15,000135,000Tukang82.00HOK37,5003,075,000145,602.60/ m2Pekerja55.00HOK30,0001,650,000Total Harga Satuan Pekerjaan$22,422,8002Pekerjaan Pasang list langit - langitPERHITUNGAN VOLUMEJenis PekerjaanPanjang (P)Volumem'm'Pasang List Plafond 1/571.5071.50Jumlah Volume71.50BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatKayu 1/5 List1.0571.5019LjrTukang0.0211.3371.502.00HOKPaku0.0171.501.00kgPekerja0.0211.3371.502.00HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume71.50Kayu 1/5 List19.00Ljr4,00076,000Harga Sat. Pekerjaan$226,000Paku1.00kg15,00015,000HARGA SATUAN PELAKSANAANTukang2.00HOK37,50075,0003,160.84/ m'Pekerja2.00HOK30,00060,000Total Harga Satuan Pekerjaan$226,000SKETSAPERHITUNGAN14Pekerjaan Instalasi Listrik1Pekerjaan Pasang 1 bh titik lampuPERHITUNGAN VOLUMEJenis PekerjaanJumlahVolumetitikTitikMemasang Titik Lampu8.008.00Jumlah Volume8.00BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatKabel NYA 1x2,5 mm15.008.00120.00m'Tukang1.0001.338.0011.00HOK=Lampu SL6bhPipa paralon 5/8"1.008.002.00ljrPekerja1.0001.338.0011.00HOK=Lampu Pijar2bhSakkelar1.008.008.00Bh=Stop Kontak5bhIsolator1.008.008.00Bh=Saklar Ganda1bhLas Dop1.008.008.00Bh=Saklar Tunggal6bhFiting Plafond1.008.008.00Bh=Panel MCB1gorupT.Dos PVC1.008.008.00BhHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume8.00Kabel NYA 1x2,5 mm120.00m'8,000960,000Harga Sat. Pekerjaan$2,056,900Pipa paralon 5/8"2.00ljr8,00016,000HARGA SATUAN PELAKSANAANSakkelar8.00Bh25,000200,000257,112.50/ titikIsolator8.00Bh4,80038,400Las Dop8.00Bh5004,000Fiting Plafond8.00Bh10,50084,000T.Dos PVC8.00Bh1,50012,000Tukang11.00HOK37,500412,500Pekerja11.00HOK30,000330,000Total Harga Satuan Pekerjaan$2,056,9002Pekerjaan Pasang 1 bh titik Stop kontakPERHITUNGAN VOLUMEJenis PekerjaanJumlahVolumetitikTitikMemasang Titik Stop kontak5.005.00Jumlah Volume5.00BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatKabel NYA 1x2,5 mm10.005.0013m'Tukang0.5001.335.003.00HOKPipa paralon 5/8"0.205.001.00ljrPekerja0.0501.335.000.0HOKStop kontak1.005.005.00BhT.Dos PVC1.005.005.00BhHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume5.00Kabel NYA 1x2,5 mm13.00m'8,000104,000Harga Sat. Pekerjaan$332,000Pipa paralon 5/8"1.00ljr8,0008,000HARGA SATUAN PELAKSANAANStop kontak5.00Bh20,000100,00066,400.00/ titikT.Dos PVC5.00Bh1,5007,500Tukang3.00HOK37,500112,500Pekerja0.0HOK30,0000.0Total Harga Satuan Pekerjaan$332,0003Pekerjaan Pasang 1 set panel boxPERHITUNGAN VOLUMEJenis PekerjaanJumlahVolumetitiksetMemasang Panel Box1.001.00Jumlah Volume1.00BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatPanel Box1.001.001.00SetTukang1.0001.331.001.00HOKMCB 10 Amp1.001.001.00BhPekerja1.0001.331.001.00HOKMiniswitch 32 Amp1.001.001.00setHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume1.00Panel Box1.00Set260,000260,000Harga Sat. Pekerjaan$432,500MCB 10 Amp1.00Bh75,00075,000HARGA SATUAN PELAKSANAANMiniswitch 32 Amp1.00set30,00030,000Tukang1.00HOK37,50037,500432,500.00/ setPekerja1.00HOK30,00030,000Total Harga Satuan Pekerjaan$432,500SKETSAPERHITUNGAN15Pekerjaan Keramik1Pasang tegel keramik 40 x 40 landasan rabat beton 1 : 3 : 5 tebal 6 cm (An.SNI)PERHITUNGAN VOLUMETtkJenis PekerjaanPanjang (P)Lebar (L)Volumem'm'm2IPas keramik lantai R. TungguLuas =20.5020.50IIPas keramik lantai R. KamarLuas =33.0033.00IIIPas keramik lantai TerasLuas =7.007.00Jumlah Volume60.50BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatTegel keramik 40x401.07960.5065DosTukang0.351.3360.5028.00HOKSemen PC @40Kg0.22860.5014.00zakPekerja0.621.3360.5050.00HOKPasir pasang0.0460.503.00m3HARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume60.50Tegel keramik 40x4065.00Dos40,0002,600,000Harga Sat. Pekerjaan$6,148,000Semen PC @40Kg14.00zak52,000728,000HARGA SATUAN PELAKSANAANPasir pasang3.00m390,000270,000Tukang28.00HOK37,5001,050,000101,619.83/ m2Pekerja50.00HOK30,0001,500,000Total Harga Satuan Pekerjaan$6,148,0002Pasang lantai keramik 20 x 20 KM/WCPERHITUNGAN VOLUMETtkJenis PekerjaanPanjang (P)Lebar (L)Volumem'm'm2IPas keramik lantai KM/WC2.001.506.00Jumlah Volume6.00BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatTegel keramik 20x201.0796.006dosTukang0.351.336.003.00HOKSemen PC @40Kg0.2086.001.00zakPekerja0.701.336.006.00HOKPasir pasang0.0456.000.0m3Semen warna0.04056.000.0kgHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume6.00Tegel keramik 20x206.00dos35,000210,000Harga Sat. Pekerjaan$554,500Semen PC @40Kg1.00zak52,00052,000HARGA SATUAN PELAKSANAANPasir pasang0.0m390,0000.0Semen warna0.0kg2,5000.092,416.67/ m2Tukang3.00HOK37,500112,500Pekerja6.00HOK30,000180,000Total Harga Satuan Pekerjaan$554,5003Pasang keramik dinding 20 x 25 KM/WCPERHITUNGAN VOLUMETtkJenis PekerjaanPanjang (P)TinggiVolumem'm'm2IPas keramik dinding KM/WC7.001.5011.51Jumlah Volume11.51BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatTegel keramik 20x201.07911.5112dosTukang0.451.3311.517.00HOKSemen PC @40Kg0.18611.512.00zakPekerja0.601.3311.519.00HOKPasir pasang0.01811.510.0m3Semen warna0.048511.511.00kgHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume11.51Tegel keramik 20x2012.00dos37,500450,000Harga Sat. Pekerjaan$1,089,000Semen PC @40Kg2.00zak52,000104,000HARGA SATUAN PELAKSANAANPasir pasang0.0m390,0000.0Semen warna1.00kg2,5002,50094,619.96/ m2Tukang7.00HOK37,500262,500Pekerja9.00HOK30,000270,000Total Harga Satuan Pekerjaan$1,089,000SKETSAPERHITUNGAN16Pekerjaan Penggantung dan Pengunci1Pasang kunci pintu 1x putarPERHITUNGAN VOLUMEBAHANTENAGA KERJATypeJenis DaunanJumlahRincianKoefVolsatRincianKoefKonvVolJmlsatBhKunci Pintu 1 x Putar1.0004.00BhTukang0.451.334.002.00HOKP-1Pintu1.00Pekerja0.601.334.003.00HOKP-2Pintu3.00J1Jendela2.00J2Jendela4.00HARGA SATUAN PEKERJAANKETERANGANJ3Jendela0.0RincianJmlsatHarga SatJumlahVolume4.00Kunci Pintu 1 x Putar4.00Bh70,000280,000Harga Sat. Pekerjaan$445,000Tukang2.00HOK37,50075,000HARGA SATUAN PELAKSANAANPekerja3.00HOK30,00090,000111,250.00/ bhTotal Harga Satuan Pekerjaan$445,0002Pasang engsel pintuBAHANTENAGA KERJARincianKoefVolsatRincianKoefKonvVolJmlsatEngsel nylon Pintu1.0006.00BhTukang0.501.336.004.00HOKPekerja0.011.336.000.0HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume6.00Engsel nylon Pintu6.00Bh15,00090,000Harga Sat. Pekerjaan$240,000Tukang4.00HOK37,500150,000HARGA SATUAN PELAKSANAANPekerja0.0HOK30,0000.040,000.00/ bhTotal Harga Satuan Pekerjaan$240,0003Pasang engsel jendelaBAHANTENAGA KERJARincianKoefVolsatRincianKoefKonvVolJmlsatEngsel nylon Jendela1.00012.00BhTukang0.101.3312.002.00HOKPekerja0.011.3312.000.0HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume12.00Engsel nylon Jendela12.00Bh10,000120,000Harga Sat. Pekerjaan$195,000Tukang2.00HOK37,50075,000HARGA SATUAN PELAKSANAANPekerja0.0HOK30,0000.016,250.00/ bhTotal Harga Satuan Pekerjaan$195,0004Pasang hak angin jendelaBAHANTENAGA KERJARincianKoefVolsatRincianKoefKonvVolJmlsatHak angin jendela1.0006.00SetTukang0.151.336.001.00HOKPekerja0.0151.336.000.0HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume6.00Hak angin jendela6.00Set13,50081,000Harga Sat. Pekerjaan$118,500Tukang1.00HOK37,50037,500HARGA SATUAN PELAKSANAANPekerja0.0HOK30,0000.019,750.00/ setTotal Harga Satuan Pekerjaan$118,5005Pasang Grendel JendelaBAHANTENAGA KERJARincianKoefVolsatRincianKoefKonvVolJmlsatGrendel jendela1.0006.00bhTukang0.101.336.001.00HOKPekerja0.011.336.000.0HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume6.00Grendel jendela6.00bh7,00042,000Harga Sat. Pekerjaan$79,500Tukang1.00HOK37,50037,500HARGA SATUAN PELAKSANAANPekerja0.0HOK30,0000.013,250.00/ bhTotal Harga Satuan Pekerjaan$79,500SKETSAPERHITUNGAN17Pekerjaan Batu Alam1Memasang batu alamPERHITUNGAN VOLUMETtkJenis PekerjaanJumlahLebarTinggiVolumeKolomm'm'm2IIPasang beton alur2.001.602.508.000.0Jumlah Volume8.00BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatBeton alur 20/401.1008.009.00m2Tukang0.351.338.004.00HOKSemen PC @ 40Kg0.1508.001.00zakPekerja0.701.338.007.00HOKPasir pasang0.0358.000.0m3HARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume8.00Beton alur 20/409.00m280,000720,000Harga Sat. Pekerjaan$1,132,000Semen PC @ 40Kg1.00zak52,00052,000HARGA SATUAN PELAKSANAANPasir pasang0.0m390,0000.0Tukang4.00HOK37,500150,000Beton alur 20/40115,750/m2Pekerja7.00HOK30,000210,000Total Harga Satuan Pekerjaan$1,132,00018Pekerjaan benangan dan ban - bananPERHITUNGAN VOLUMETtkJenis PekerjaanPanjangVolumem'm'IBenangan Kolom0.00.0IIBenangan Balok0.00.0IIIBenangan sudut tembok0.00.0IVBenangan ornamen0.00.0Jumlah Volume0.0BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatSemen PC @ 40Kg0.00680.00.0zakTukang0.0671.330.00.0HOKPasir pasang0.0010.00.0m3Pekerja0.1331.330.00.0HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume0.0Semen PC @ 40Kg0.0zak52,0000.0Harga Sat. Pekerjaan0.0Pasir pasang0.0m390,0000.0HARGA SATUAN PELAKSANAANTukang0.0HOK37,5000.0Pekerja0.0HOK30,0000.00.0/ m'Total Harga Satuan Pekerjaan0.019Pekerjaan Pengecatan1Mengecat tembok / plafond (An.SNI)PERHITUNGAN VOLUMEBAHANTtKJenis PekerjaanVolumeRincianKoefVolJmlsatm2Plamir tembok0.10549.4255kgIPengecatan dinding346.79Cat dasar0.100549.4255.00kgIIPengecatan gewel luar4.08Cat penutup 2x0.260549.42143.00kgIIIPengecatan Ornamen36.73Kertas gosok0.050549.4227.00lbrIVPengecatan KM/WC7.82VPengecatan langit-langit154.00TENAGA KERJAJumlah Volume549.42RincianKoefKonvVolJmlsatTukang0.0631.33549.4246.00HOKPekerja0.0201.33549.4215.00HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume549.42Plamir tembok55kg20,0001,100,000Harga Sat. Pekerjaan$6,920,000Cat dasar55.0kg18,000990,000HARGA SATUAN PELAKSANAANCat penutup 2x143.0kg18,0002,574,000Kertas gosok27.0lbr3,00081,00012,595.04/ m2Tukang46.00HOK37,5001,725,000Pekerja15.00HOK30,000450,000Total Harga Satuan Pekerjaan$6,920,000SKETSAPERHITUNGAN2Mengecat Kayu baru serta menggosok dan mendempul (An.SNI)PERHITUNGAN VOLUMEBAHANTtKJenis PekerjaanVolumeRincianKoefVolJmlsatm2Cat kayu0.4326.3011kgIMengecat Kusen10.56Meni0.20026.305.00kgIIMengecat Daunan7.08Thiner0.03226.301.00ltrIIIMengecat Listplank8.65Plamir kayu0.15026.304.00kgJumlah Volume26.30Kertas gosok0.50026.3013.00lbrTENAGA KERJARincianKoefKonvVolJmlsatTukang0.0091.3326.300.0HOKPekerja0.0701.3326.302.00HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume26.30Cat kayu11kg43,000473,000Harga Sat. Pekerjaan$759,500Meni5.0kg20,000100,000HARGA SATUAN PELAKSANAANThiner1.0ltr17,50017,500Plamir kayu4.0kg17,50070,00028,883.60/ m2Kertas gosok13.0lbr3,00039,000Tukang0.0HOK37,5000.0Pekerja2.00HOK30,00060,000Total Harga Satuan Pekerjaan$759,50020Pekerjaan Instalasi Air Bersih dan Kotor1Memasang kloset jongkok/porselin (An. SNI)PERHITUNGAN VOLUMETtkJenis PekerjaanJumlahVolumebhbhIMemasang closed jongkok1.001.00Jumlah Volume1.00BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatKloset jongkok porselin1.001.001.00bhTukang1.5001.331.002.00HOKSemen PC @ 40Kg0.121.000.0zakPekerja1.0001.331.001.00HOKPasir pasang0.011.000.0m3HARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume1.00Kloset jongkok porselin1.00bh120,000120,000Harga Sat. Pekerjaan$225,000Semen PC @ 40Kg0.0zak52,0000.0HARGA SATUAN PELAKSANAANTukang2.00HOK37,50075,000Pekerja1.00HOK30,00030,000225,000.00/ bhTotal Harga Satuan Pekerjaan$225,0002Memasang Kran diameter " atau " / memasang floor drainPERHITUNGAN VOLUMETtkJenis PekerjaanJumlahVolumebhbhIMemasang kran air3.003.00IIMemasang Floordrain1.001.00Jumlah Volume4.00BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatKran air1.003.003.00bhTukang0.0101.334.000.0HOKFloor drain1.001.001.00bhPekerja0.1001.334.001.00HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume4.00Kran air3.00bh6,00018,000Harga Sat. Pekerjaan$60,500Floor drain1.00bh12,50012,500HARGA SATUAN PELAKSANAANTukang0.0HOK37,5000.0Pekerja1.00HOK30,00030,00015,125.00/ bhTotal Harga Satuan Pekerjaan$60,500SKETSAPERHITUNGAN3Pasang Pipa PVC dia. 3"(sal.air kotor, sal. Air hujan) (An.SNI)PERHITUNGAN VOLUMETtkJenis PekerjaanPanjangVolumem'm'IPipa PVC 3" D ex MASPION20.0020.00Jumlah Volume20.00BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatPipa PVC 3" D1.0020.005.00ljrTukang0.1351.3320.004.00HOKPekerja0.0811.3320.002.00HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume20.00Pipa PVC 3" D5.00ljr16,00080,000Harga Sat. Pekerjaan$290,000Tukang4.00HOK37,500150,000HARGA SATUAN PELAKSANAANPekerja2.00HOK30,00060,00014,500.00/ m'Total Harga Satuan Pekerjaan$290,0004Pasang Pipa PVC dia. 3/4" (An.SNI)PERHITUNGAN VOLUMETtkJenis PekerjaanPanjangVolumem'm'IPipa PVC 3/4"0.00.0Jumlah Volume0.0BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatPipa PVC 3/4"1.000.00.0ljrTukang0.0601.330.00.0HOKPekerja0.0361.330.00.0HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume0.0Pipa PVC 3/4"0.0ljr16,0000.0Harga Sat. Pekerjaan0.0Tukang0.0HOK37,5000.0HARGA SATUAN PELAKSANAANPekerja0.0HOK30,0000.00.0/ m'Total Harga Satuan Pekerjaan0.05Pekerjaan Pembuatan SepticktankPERHITUNGAN VOLUMETtkJenis PekerjaanJumlahVolumeunitunitIPek. Septicktank1.001.00Jumlah Volume1.00BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatBata merah942.001.00942.00bhTukang4.1761.331.006.00HOKPasir pasang1.04731.001.00m3Pekerja10.2731.331.0014.00HOKKoral0.17011.000.0m3Semen PC @ 40Kg5.201.005.00zakBesi dia 85.191.005.00ljrKawat bendrat1.021.001.00kgSirap 2/20 begesting0.081.003.00ljrPaku0.631.001.00kgHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume1.00Bata merah942.00bh450423,900Harga Sat. Pekerjaan$1,677,900Pasir pasang1.00m390,00090,000HARGA SATUAN PELAKSANAANKoral0.0m3125,0000.01,677,900.00/ unitSemen PC @ 40Kg5.00zak52,000260,000Besi dia 85.00ljr41,000205,000Kawat bendrat1.00kg15,00015,000Sirap 2/20 begesting3.00ljr8,00024,000Paku1.00kg15,00015,000Tukang6.00HOK37,500225,000Pekerja14.00HOK30,000420,000Total Harga Satuan Pekerjaan$1,677,900SKETSAPERHITUNGAN6Pekerjaan Pembuatan Sumur ResapanPERHITUNGAN VOLUMETtkJenis PekerjaanJumlahVolumeunitunitIPek. Pembuatan resapan1.001.00Jumlah Volume1.00BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatBata merah1,3901.001,390bhTukang4.1761.331.006.00HOKPasir pasang0.57301.001.00m3Pekerja10.2731.331.0014.00HOKKoral0.17011.000.0m3Semen PC @ 40Kg2.991.003.00zakBesi dia 81.881.002.00ljrKawat bendrat0.701.001.00kgSirap 2/20 begesting0.081.003.00ljrPaku0.631.001.00kgHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume1.00Bata merah1,390bh450625,500Harga Sat. Pekerjaan$1,652,500Pasir pasang1.00m390,00090,000HARGA SATUAN PELAKSANAANKoral0.0m3125,0000.01,652,500.00/ unitSemen PC @ 40Kg3.00zak52,000156,000Besi dia 82.00ljr41,00082,000Kawat bendrat1.00kg15,00015,000Sirap 2/20 begesting3.00ljr8,00024,000Paku1.00kg15,00015,000Tukang6.00HOK37,500225,000Pekerja14.00HOK30,000420,000Total Harga Satuan Pekerjaan$1,652,5007Pekerjaan Pembuatan Sumur GaliPERHITUNGAN VOLUMETtkJenis PekerjaanJumlahVolumeunitunitIPek. Pembuatan Sumur0.00.0Jumlah Volume0.0TENAGA KERJAKETERANGANRincianKoefKonvVolJmlsatVolume0.0Tukang14.0001.330.00.0HOKHarga Sat. Pekerjaan0.0Pekerja14.0001.330.00.0HOKHARGA SATUAN PELAKSANAAN0.0/ unitHARGA SATUAN PEKERJAANRincianJmlsatHarga SatJumlahTukang0.0HOK37,5000.0Pekerja0.0HOK30,0000.0Total Harga Satuan Pekerjaan0.0REKAPITULASI BAHAN DAN UPAHBAHANBAHANNOJENIS BAHANVOLUMESATUANNOTENAGA KERJAVOLUMESATUAN1SirtuSirtuSirtuSirtuSirtuSirtuSirtuSirtuSirtuSirtuSirtuSirtuSirtuSirtuSirtuSirtu25.00m3m366Panel BoxPanel BoxPanel BoxPanel BoxPanel Box1.00Setset2Pasir UrugPasir UrugPasir UrugPasir UrugPasir UrugPasir UrugPasir UrugPasir UrugPasir UrugPasir UrugPasir UrugPasir UrugPasir UrugPasir UrugPasir UrugPasir Urug10.00m3m367MCB 10 AMPMCB 10 AMPMCB 10 AMPMCB 10 AMPMCB 10 AMP1.00bhbh3Pasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/Cor44.00m3m368Miniswitch 32 AMPMiniswitch 32 AMPMiniswitch 32 AMPMiniswitch 32 AMPMiniswitch 32 AMP1.00bhbh4Batu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/Gebal41.00m3m369Lampu SL 18 WattLampu SL 18 WattLampu SL 18 WattLampu SL 18 WattLampu SL 18 Watt6.00bhbh5Batu Pecah 2/3 (Koral Beton)Batu Pecah 2/3 (Koral Beton)Batu Pecah 2/3 (Koral Beton)Batu Pecah 2/3 (Koral Beton)Batu Pecah 2/3 (Koral Beton)Batu Pecah 2/3 (Koral Beton)Batu Pecah 2/3 (Koral Beton)Batu Pecah 2/3 (Koral Beton)Batu Pecah 2/3 (Koral Beton)Batu Pecah 2/3 (Koral Beton)Batu Pecah 2/3 (Koral Beton)Batu Pecah 2/3 (Koral Beton)Batu Pecah 2/3 (Koral Beton)Batu Pecah 2/3 (Koral Beton)Batu Pecah 2/3 (Koral Beton)Batu Pecah 2/3 (Koral Beton)3.00m3m370Lampu Pijar 10 WattLampu Pijar 10 WattLampu Pijar 10 WattLampu Pijar 10 WattLampu Pijar 10 Watt2.00bhbh6Semen PC 40 KgSemen PC 50 KgSemen PC 50 KgSemen PC 50 KgSemen PC 50 KgSemen PC 50 KgSemen PC 50 KgSemen PC 50 KgSemen PC 50 KgSemen PC 50 KgSemen PC 50 KgSemen PC 50 KgSemen PC 50 KgSemen PC 50 KgSemen PC 50 KgSemen PC 50 Kg237.00saksak71SanyoSanyoSanyoSanyoSanyo1.00bhbh7Semen warnaSemen warnaSemen warnaSemen warnaSemen warnaSemen warnaSemen warnaSemen warnaSemen warnaSemen warnaSemen warnaSemen warnaSemen warnaSemen warnaSemen warnaSemen warna1.00Kgsak72Beton alur / garisBeton alur / garisBeton alur / garisBeton alur / garisBeton alur / garis9.00m2m28Batu Bata/merahBatu Bata/merahBatu Bata/merahBatu Bata/merahBatu Bata/merahBatu Bata/merahBatu Bata/merahBatu Bata/merahBatu Bata/merahBatu Bata/merahBatu Bata/merahBatu Bata/merahBatu Bata/merahBatu Bata/merahBatu Bata/merahBatu Bata/merah18,028bhbh9Besi Beton 12 mmBesi Beton 12 mmBesi Beton 12 mmBesi Beton 12 mmBesi Beton 12 mmBesi Beton 12 mmBesi Beton 12 mmBesi Beton 12 mmBesi Beton 12 mmBesi Beton 12 mmBesi Beton 12 mmBesi Beton 12 mmBesi Beton 12 mmBesi Beton 12 mmBesi Beton 12 mmBesi Beton 12 mm73.00LjrLjr10Besi Beton 8 mmBesi Beton 8 mmBesi Beton 8 mmBesi Beton 8 mmBesi Beton 8 mmBesi Beton 8 mmBesi Beton 8 mmBesi Beton 8 mmBesi Beton 8 mmBesi Beton 8 mmBesi Beton 8 mmBesi Beton 8 mmBesi Beton 8 mmBesi Beton 8 mmBesi Beton 8 mmBesi Beton 8 mm20.00LjrLjr11Besi Beton 6 mmBesi Beton 6 mmBesi Beton 6 mmBesi Beton 6 mmBesi Beton 6 mmBesi Beton 6 mmBesi Beton 6 mmBesi Beton 6 mmBesi Beton 6 mmBesi Beton 6 mmBesi Beton 6 mmBesi Beton 6 mmBesi Beton 6 mmBesi Beton 6 mmBesi Beton 6 mmBesi Beton 6 mm78.00LjrLjr12Kawat BendratKawat BendratKawat BendratKawat BendratKawat BendratKawat BendratKawat BendratKawat BendratKawat BendratKawat BendratKawat BendratKawat BendratKawat BendratKawat BendratKawat BendratKawat Bendrat15.00KgKg13PakuPakuPakuPakuPakuPakuPakuPakuPakuPakuPakuPakuPakuPakuPakuPaku37.00KgKgTENAGA KERJA14Kayu Meranti, balok 8/12 (Kuda-kuda, gording, nok)Kayu Meranti, balok 8/12 (Kuda-kuda, gording, nok)Kayu Meranti, balok 8/12 (Kuda-kuda, gording, nok)Kayu Meranti, balok 8/12 (Kuda-kuda, gording, nok)Kayu Meranti, balok 8/12 (Kuda-kuda, gording, nok)Kayu Meranti, balok 8/12 (Kuda-kuda, gording, nok)Kayu Meranti, balok 8/12 (Kuda-kuda, gording, nok)Kayu Meranti, balok 8/12 (Kuda-kuda, gording, nok)Kayu Meranti, balok 8/12 (Kuda-kuda, gording, nok)Kayu Meranti, balok 8/12 (Kuda-kuda, gording, nok)Kayu Meranti, balok 8/12 (Kuda-kuda, gording, nok)Kayu Meranti, balok 8/12 (Kuda-kuda, gording, nok)Kayu Meranti, balok 8/12 (Kuda-kuda, gording, nok)Kayu Meranti, balok 8/12 (Kuda-kuda, gording, nok)Kayu Meranti, balok 8/12 (Kuda-kuda, gording, nok)Kayu Meranti, balok 8/12 (Kuda-kuda, gording, nok)44.00Ljrm3NOTENAGA KERJAVOLUMESATUAN15Kayu Meranti, balok 6/12 (Gapit kuda-kuda)Kayu Meranti, balok 6/12 (Gapit kuda-kuda dan Ikatan angin)Kayu Meranti, balok 6/12 (Gapit kuda-kuda dan Ikatan angin)Kayu Meranti, balok 6/12 (Gapit kuda-kuda dan Ikatan angin)Kayu Meranti, balok 6/12 (Gapit kuda-kuda dan Ikatan angin)Kayu Meranti, balok 6/12 (Gapit kuda-kuda dan Ikatan angin)Kayu Meranti, balok 6/12 (Gapit kuda-kuda dan Ikatan angin)Kayu Meranti, balok 6/12 (Gapit kuda-kuda dan Ikatan angin)Kayu Meranti, balok 6/12 (Gapit kuda-kuda dan Ikatan angin)Kayu Meranti, balok 6/12 (Gapit kuda-kuda dan Ikatan angin)Kayu Meranti, balok 6/12 (Gapit kuda-kuda dan Ikatan angin)Kayu Meranti, balok 6/12 (Gapit kuda-kuda dan Ikatan angin)Kayu Meranti, balok 6/12 (Gapit kuda-kuda dan Ikatan angin)Kayu Meranti, balok 6/12 (Gapit kuda-kuda dan Ikatan angin)Kayu Meranti, balok 6/12 (Gapit kuda-kuda dan Ikatan angin)Kayu Meranti, balok 6/12 (Gapit kuda-kuda dan Ikatan angin)2.00Ljrm316Kayu Meranti, balok 6/15 (Kusen)Kayu Meranti, balok 6/15 (Kusen)Kayu Meranti, balok 6/15 (Kusen)Kayu Meranti, balok 6/15 (Kusen)Kayu Meranti, balok 6/15 (Kusen)Kayu Meranti, balok 6/15 (Kusen)Kayu Meranti, balok 6/15 (Kusen)Kayu Meranti, balok 6/15 (Kusen)Kayu Meranti, balok 6/15 (Kusen)Kayu Meranti, balok 6/15 (Kusen)Kayu Meranti, balok 6/15 (Kusen)Kayu Meranti, balok 6/15 (Kusen)Kayu Meranti, balok 6/15 (Kusen)Kayu Meranti, balok 6/15 (Kusen)Kayu Meranti, balok 6/15 (Kusen)Kayu Meranti, balok 6/15 (Kusen)17.00Ljrm31Tukang484.0HOK17Kayu Meranti, papan 3/20 (Slimar/Daunan, Listplank)Kayu Meranti, papan 3/20 (Slimar / Daunan, Listplank)Kayu Meranti, papan 3/20 (Slimar / Daunan, Listplank)Kayu Meranti, papan 3/20 (Slimar / Daunan, Listplank)Kayu Meranti, papan 3/20 (Slimar / Daunan, Listplank)Kayu Meranti, papan 3/20 (Slimar / Daunan, Listplank)Kayu Meranti, papan 3/20 (Slimar / Daunan, Listplank)Kayu Meranti, papan 3/20 (Slimar / Daunan, Listplank)Kayu Meranti, papan 3/20 (Slimar / Daunan, Listplank)Kayu Meranti, papan 3/20 (Slimar / Daunan, Listplank)Kayu Meranti, papan 3/20 (Slimar / Daunan, Listplank)Kayu Meranti, papan 3/20 (Slimar / Daunan, Listplank)Kayu Meranti, papan 3/20 (Slimar / Daunan, Listplank)Kayu Meranti, papan 3/20 (Slimar / Daunan, Listplank)Kayu Meranti, papan 3/20 (Slimar / Daunan, Listplank)Kayu Meranti, papan 3/20 (Slimar / Daunan, Listplank)15.00Ljrm318Kayu Meranti, papan 3/8 (Slimar / Daunan)Kayu Meranti, papan 3/8 (Slimar / Daunan)Kayu Meranti, papan 3/8 (Slimar / Daunan)Kayu Meranti, papan 3/8 (Slimar / Daunan)Kayu Meranti, papan 3/8 (Slimar / Daunan)Kayu Meranti, papan 3/8 (Slimar / Daunan)Kayu Meranti, papan 3/8 (Slimar / Daunan)Kayu Meranti, papan 3/8 (Slimar / Daunan)Kayu Meranti, papan 3/8 (Slimar / Daunan)Kayu Meranti, papan 3/8 (Slimar / Daunan)Kayu Meranti, papan 3/8 (Slimar / Daunan)Kayu Meranti, papan 3/8 (Slimar / Daunan)Kayu Meranti, papan 3/8 (Slimar / Daunan)Kayu Meranti, papan 3/8 (Slimar / Daunan)Kayu Meranti, papan 3/8 (Slimar / Daunan)Kayu Meranti, papan 3/8 (Slimar / Daunan)10.00Ljrm32Pekerja684.00HOK19Kayu Meranti, balok 5/7 (Usuk)Kayu Meranti, balok 5/7 (Usuk)Kayu Meranti, balok 5/7 (Usuk)Kayu Meranti, balok 5/7 (Usuk)Kayu Meranti, balok 5/7 (Usuk)Kayu Meranti, balok 5/7 (Usuk)Kayu Meranti, balok 5/7 (Usuk)Kayu Meranti, balok 5/7 (Usuk)Kayu Meranti, balok 5/7 (Usuk)Kayu Meranti, balok 5/7 (Usuk)Kayu Meranti, balok 5/7 (Usuk)Kayu Meranti, balok 5/7 (Usuk)Kayu Meranti, balok 5/7 (Usuk)Kayu Meranti, balok 5/7 (Usuk)Kayu Meranti, balok 5/7 (Usuk)Kayu Meranti, balok 5/7 (Usuk)49.00Ljrm320Kayu Meranti, balok 4/6 (Plafond + Gantungan Plafond)Kayu Meranti, balok 4/6 (Plafond)Kayu Meranti, balok 4/6 (Plafond)Kayu Meranti, balok 4/6 (Plafond)Kayu Meranti, balok 4/6 (Plafond)Kayu Meranti, balok 4/6 (Plafond)Kayu Meranti, balok 4/6 (Plafond)Kayu Meranti, balok 4/6 (Plafond)Kayu Meranti, balok 4/6 (Plafond)Kayu Meranti, balok 4/6 (Plafond)Kayu Meranti, balok 4/6 (Plafond)Kayu Meranti, balok 4/6 (Plafond)Kayu Meranti, balok 4/6 (Plafond)Kayu Meranti, balok 4/6 (Plafond)Kayu Meranti, balok 4/6 (Plafond)Kayu Meranti, balok 4/6 (Plafond)369.00Ljrm321Kayu Meranti, reng 2/3 (Reng)Kayu Meranti, reng 2/3 (Reng dan gantungan plafond)Kayu Meranti, reng 2/3 (Reng dan gantungan plafond)Kayu Meranti, reng 2/3 (Reng dan gantungan plafond)Kayu Meranti, reng 2/3 (Reng dan gantungan plafond)Kayu Meranti, reng 2/3 (Reng dan gantungan plafond)Kayu Meranti, reng 2/3 (Reng dan gantungan plafond)Kayu Meranti, reng 2/3 (Reng dan gantungan plafond)Kayu Meranti, reng 2/3 (Reng dan gantungan plafond)Kayu Meranti, reng 2/3 (Reng dan gantungan plafond)Kayu Meranti, reng 2/3 (Reng dan gantungan plafond)Kayu Meranti, reng 2/3 (Reng dan gantungan plafond)Kayu Meranti, reng 2/3 (Reng dan gantungan plafond)Kayu Meranti, reng 2/3 (Reng dan gantungan plafond)Kayu Meranti, reng 2/3 (Reng dan gantungan plafond)Kayu Meranti, reng 2/3 (Reng dan gantungan plafond)155.00Ljrm322Kayu Meranti, papan 2/20 (Reuter+Papan talang)Kayu Meranti, papan 2/20 (Reuter)Kayu Meranti, papan 2/20 (Reuter)Kayu Meranti, papan 2/20 (Reuter)Kayu Meranti, papan 2/20 (Reuter)Kayu Meranti, papan 2/20 (Reuter)Kayu Meranti, papan 2/20 (Reuter)Kayu Meranti, papan 2/20 (Reuter)Kayu Meranti, papan 2/20 (Reuter)Kayu Meranti, papan 2/20 (Reuter)Kayu Meranti, papan 2/20 (Reuter)Kayu Meranti, papan 2/20 (Reuter)Kayu Meranti, papan 2/20 (Reuter)Kayu Meranti, papan 2/20 (Reuter)Kayu Meranti, papan 2/20 (Reuter)Kayu Meranti, papan 2/20 (Reuter)10.00Ljrm323Kayu list plafond 1/5 (Kayu non Profil)Kayu list plafond 1/5 (Kayu non Profil)Kayu list plafond 1/5 (Kayu non Profil)Kayu list plafond 1/5 (Kayu non Profil)Kayu list plafond 1/5 (Kayu non Profil)Kayu list plafond 1/5 (Kayu non Profil)Kayu list plafond 1/5 (Kayu non Profil)Kayu list plafond 1/5 (Kayu non Profil)Kayu list plafond 1/5 (Kayu non Profil)Kayu list plafond 1/5 (Kayu non Profil)Kayu list plafond 1/5 (Kayu non Profil)Kayu list plafond 1/5 (Kayu non Profil)Kayu list plafond 1/5 (Kayu non Profil)Kayu list plafond 1/5 (Kayu non Profil)Kayu list plafond 1/5 (Kayu non Profil)Kayu list plafond 1/5 (Kayu non Profil)19.00Ljrm324Kayu Lokal, balok 5/7 (Kayu begesting)Kayu Lokal, balok 5/7 (Kayu begesting)Kayu Lokal, balok 5/7 (Kayu begesting)Kayu Lokal, balok 5/7 (Kayu begesting)Kayu Lokal, balok 5/7 (Kayu begesting)Kayu Lokal, balok 5/7 (Kayu begesting)Kayu Lokal, balok 5/7 (Kayu begesting)Kayu Lokal, balok 5/7 (Kayu begesting)Kayu Lokal, balok 5/7 (Kayu begesting)Kayu Lokal, balok 5/7 (Kayu begesting)Kayu Lokal, balok 5/7 (Kayu begesting)Kayu Lokal, balok 5/7 (Kayu begesting)Kayu Lokal, balok 5/7 (Kayu begesting)Kayu Lokal, balok 5/7 (Kayu begesting)Kayu Lokal, balok 5/7 (Kayu begesting)Kayu Lokal, balok 5/7 (Kayu begesting)4.00Ljrm325Kayu Lokal, balok 2/3 (Kayu begesting)Kayu Lokal, balok 2/3 (Kayu begesting)Kayu Lokal, balok 2/3 (Kayu begesting)Kayu Lokal, balok 2/3 (Kayu begesting)Kayu Lokal, balok 2/3 (Kayu begesting)Kayu Lokal, balok 2/3 (Kayu begesting)Kayu Lokal, balok 2/3 (Kayu begesting)Kayu Lokal, balok 2/3 (Kayu begesting)Kayu Lokal, balok 2/3 (Kayu begesting)Kayu Lokal, balok 2/3 (Kayu begesting)Kayu Lokal, balok 2/3 (Kayu begesting)Kayu Lokal, balok 2/3 (Kayu begesting)Kayu Lokal, balok 2/3 (Kayu begesting)Kayu Lokal, balok 2/3 (Kayu begesting)Kayu Lokal, balok 2/3 (Kayu begesting)Kayu Lokal, balok 2/3 (Kayu begesting)5.00Ljrm326Kayu Lokal / Randu, papan 2/20 (Kayu begesting)Kayu Lokal / Randu, papan 2/20 (Kayu begesting)Kayu Lokal / Randu, papan 2/20 (Kayu begesting)Kayu Lokal / Randu, papan 2/20 (Kayu begesting)Kayu Lokal / Randu, papan 2/20 (Kayu begesting)Kayu Lokal / Randu, papan 2/20 (Kayu begesting)Kayu Lokal / Randu, papan 2/20 (Kayu begesting)Kayu Lokal / Randu, papan 2/20 (Kayu begesting)Kayu Lokal / Randu, papan 2/20 (Kayu begesting)Kayu Lokal / Randu, papan 2/20 (Kayu begesting)Kayu Lokal / Randu, papan 2/20 (Kayu begesting)Kayu Lokal / Randu, papan 2/20 (Kayu begesting)Kayu Lokal / Randu, papan 2/20 (Kayu begesting)Kayu Lokal / Randu, papan 2/20 (Kayu begesting)Kayu Lokal / Randu, papan 2/20 (Kayu begesting)Kayu Lokal / Randu, papan 2/20 (Kayu begesting)46.00Ljrm327Triplek tebal 4 mm (Begesting plat beton)Triplek tebal 4 mm (Begesting plat beton)Triplek tebal 4 mm (Begesting plat beton)Triplek tebal 4 mm (Begesting plat beton)Triplek tebal 4 mm (Begesting plat beton)Triplek tebal 4 mm (Begesting plat beton)Triplek tebal 4 mm (Begesting plat beton)Triplek tebal 4 mm (Begesting plat beton)Triplek tebal 4 mm (Begesting plat beton)Triplek tebal 4 mm (Begesting plat beton)Triplek tebal 4 mm (Begesting plat beton)Triplek tebal 4 mm (Begesting plat beton)Triplek tebal 4 mm (Begesting plat beton)Triplek tebal 4 mm (Begesting plat beton)Triplek tebal 4 mm (Begesting plat beton)Triplek tebal 4 mm (Begesting plat beton)2.00Ljrm328Bambu kwalitas baik @ 3 m'Bambu kwalitas baik @ 3 m'Bambu kwalitas baik @ 3 m'Bambu kwalitas baik @ 3 m'Bambu kwalitas baik @ 3 m'Bambu kwalitas baik @ 3 m'Bambu kwalitas baik @ 3 m'Bambu kwalitas baik @ 3 m'Bambu kwalitas baik @ 3 m'Bambu kwalitas baik @ 3 m'Bambu kwalitas baik @ 3 m'Bambu kwalitas baik @ 3 m'Bambu kwalitas baik @ 3 m'Bambu kwalitas baik @ 3 m'Bambu kwalitas baik @ 3 m'Bambu kwalitas baik @ 3 m'21.00Ljrm329Besi Plat strip / Kawel / BautBesi Plat strip / Kawel / BautBesi Plat strip / Kawel / BautBesi Plat strip / Kawel / BautBesi Plat strip / Kawel / BautBesi Plat strip / Kawel / BautBesi Plat strip / Kawel / BautBesi Plat strip / Kawel / BautBesi Plat strip / Kawel / BautBesi Plat strip / Kawel / BautBesi Plat strip / Kawel / BautBesi Plat strip / Kawel / BautBesi Plat strip / Kawel / BautBesi Plat strip / Kawel / BautBesi Plat strip / Kawel / BautBesi Plat strip / Kawel / Baut24.00KgKg30Karet Talang BJLS 30, Lebar 60 cmSeng Talang BJLS 30, Lebar 60cmSeng Talang BJLS 30, Lebar 60cmSeng Talang BJLS 30, Lebar 60cmSeng Talang BJLS 30, Lebar 60cmSeng Talang BJLS 30, Lebar 60cmSeng Talang BJLS 30, Lebar 60cmSeng Talang BJLS 30, Lebar 60cmSeng Talang BJLS 30, Lebar 60cmSeng Talang BJLS 30, Lebar 60cmSeng Talang BJLS 30, Lebar 60cmSeng Talang BJLS 30, Lebar 60cmSeng Talang BJLS 30, Lebar 60cmSeng Talang BJLS 30, Lebar 60cmSeng Talang BJLS 30, Lebar 60cmSeng Talang BJLS 30, Lebar 60cm14.00m'm'31Genteng Karang PilangGenteng Karang PilangGenteng Karang PilangGenteng Karang PilangGenteng Karang PilangGenteng Karang PilangGenteng Karang PilangGenteng Karang PilangGenteng Karang PilangGenteng Karang PilangGenteng Karang PilangGenteng Karang PilangGenteng Karang PilangGenteng Karang PilangGenteng Karang PilangGenteng Karang Pilang2,145.00m2m232Genteng Bubungan Karang PilangGenteng Bubungan Karang PilangGenteng Bubungan Karang PilangGenteng Bubungan Karang PilangGenteng Bubungan Karang PilangGenteng Bubungan Karang PilangGenteng Bubungan Karang PilangGenteng Bubungan Karang PilangGenteng Bubungan Karang PilangGenteng Bubungan Karang PilangGenteng Bubungan Karang PilangGenteng Bubungan Karang PilangGenteng Bubungan Karang PilangGenteng Bubungan Karang PilangGenteng Bubungan Karang PilangGenteng Bubungan Karang Pilang44.00m'm'33Pintu PVCPintu PVCPintu PVCPintu PVCPintu PVCPintu PVCPintu PVCPintu PVCPintu PVCPintu PVCPintu PVCPintu PVCPintu PVCPintu PVCPintu PVCPintu PVC1.00unitunit34Kaca Bening 5 mmKaca Bening 5 mmKaca Bening 5 mmKaca Bening 5 mmKaca Bening 5 mmKaca Bening 5 mmKaca Bening 5 mmKaca Bening 5 mmKaca Bening 5 mmKaca Bening 5 mmKaca Bening 5 mmKaca Bening 5 mmKaca Bening 5 mmKaca Bening 5 mmKaca Bening 5 mmKaca Bening 5 mm10.00m2m235Keramik 40x40 warna motifKeramik 40x40 warna motifKeramik 40x40 warna motifKeramik 40x40 warna motifKeramik 40x40 warna motifKeramik 40x40 warna motifKeramik 40x40 warna motifKeramik 40x40 warna motifKeramik 40x40 warna motifKeramik 40x40 warna motifKeramik 40x40 warna motifKeramik 40x40 warna motifKeramik 40x40 warna motifKeramik 40x40 warna motifKeramik 40x40 warna motifKeramik 40x40 warna motif65.00Dosm236Keramik 20/20 KM/WCKeramik 20/20 KM/WCKeramik 20/20 KM/WCKeramik 20/20 KM/WCKeramik 20/20 KM/WCKeramik 20/20 KM/WCKeramik 20/20 KM/WCKeramik 20/20 KM/WCKeramik 20/20 KM/WCKeramik 20/20 KM/WCKeramik 20/20 KM/WCKeramik 20/20 KM/WCKeramik 20/20 KM/WCKeramik 20/20 KM/WCKeramik 20/20 KM/WCKeramik 20/20 KM/WC6.00Dosm237Keramik dinding 20/25 KM/WCKeramik dinding 20/25 KM/WCKeramik dinding 20/25 KM/WCKeramik dinding 20/25 KM/WCKeramik dinding 20/25 KM/WCKeramik dinding 20/25 KM/WCKeramik dinding 20/25 KM/WCKeramik dinding 20/25 KM/WCKeramik dinding 20/25 KM/WCKeramik dinding 20/25 KM/WCKeramik dinding 20/25 KM/WCKeramik dinding 20/25 KM/WCKeramik dinding 20/25 KM/WCKeramik dinding 20/25 KM/WCKeramik dinding 20/25 KM/WCKeramik dinding 20/25 KM/WC12.00Dosm238Roster beton topiRoster beton topiRoster beton topiRoster beton topiRoster beton topiRoster beton topiRoster beton topiRoster beton topiRoster beton topiRoster beton topiRoster beton topiRoster beton topiRoster beton topiRoster beton topiRoster beton topiRoster beton topi0.0bhbh39Playwood tbl 4 mm, 1.20 x 2.40 m (Langit-langit)Playwood tbl 4 mm, 1.20 x 2.40 m (Langit-langit)Playwood tbl 4 mm, 1.20 x 2.40 m (Langit-langit)Playwood tbl 4 mm, 1.20 x 2.40 m (Langit-langit)Playwood tbl 4 mm, 1.20 x 2.40 m (Langit-langit)Playwood tbl 4 mm, 1.20 x 2.40 m (Langit-langit)Playwood tbl 4 mm, 1.20 x 2.40 m (Langit-langit)Playwood tbl 4 mm, 1.20 x 2.40 m (Langit-langit)Playwood tbl 4 mm, 1.20 x 2.40 m (Langit-langit)Playwood tbl 4 mm, 1.20 x 2.40 m (Langit-langit)Playwood tbl 4 mm, 1.20 x 2.40 m (Langit-langit)Playwood tbl 4 mm, 1.20 x 2.40 m (Langit-langit)Playwood tbl 4 mm, 1.20 x 2.40 m (Langit-langit)Playwood tbl 4 mm, 1.20 x 2.40 m (Langit-langit)Playwood tbl 4 mm, 1.20 x 2.40 m (Langit-langit)Playwood tbl 4 mm, 1.20 x 2.40 m (Langit-langit)56.06Lbrm240Plamir TembokPlamir TembokPlamir TembokPlamir TembokPlamir TembokPlamir TembokPlamir TembokPlamir TembokPlamir TembokPlamir TembokPlamir TembokPlamir TembokPlamir TembokPlamir TembokPlamir TembokPlamir Tembok55.00KgKg41Plamir KayuPlamir KayuPlamir KayuPlamir KayuPlamir KayuPlamir KayuPlamir KayuPlamir KayuPlamir KayuPlamir KayuPlamir KayuPlamir KayuPlamir KayuPlamir KayuPlamir KayuPlamir Kayu4.00KgKg42Cat TembokCat TembokCat TembokCat TembokCat TembokCat TembokCat TembokCat TembokCat TembokCat TembokCat TembokCat TembokCat TembokCat TembokCat TembokCat Tembok198.00KgKg43Cat KayuCat KayuCat KayuCat KayuCat KayuCat KayuCat KayuCat KayuCat KayuCat KayuCat KayuCat KayuCat KayuCat KayuCat KayuCat Kayu11.00KgKg44Cat Meni Kayu Setara PedangCat Meni Kayu Setara PedangCat Meni Kayu Setara PedangCat Meni Kayu Setara PedangCat Meni Kayu Setara PedangCat Meni Kayu Setara PedangCat Meni Kayu Setara PedangCat Meni Kayu Setara PedangCat Meni Kayu Setara PedangCat Meni Kayu Setara PedangCat Meni Kayu Setara PedangCat Meni Kayu Setara PedangCat Meni Kayu Setara PedangCat Meni Kayu Setara PedangCat Meni Kayu Setara PedangCat Meni Kayu Setara Pedang5.00KgKg45ThinnerThinnerThinnerThinnerThinnerThinnerThinnerThinnerThinnerThinnerThinnerThinnerThinnerThinnerThinnerThinner1.00ltrltr46Kertas Gosok / amplasKertas Gosok / amplasKertas Gosok / amplasKertas Gosok / amplasKertas Gosok / amplasKertas Gosok / amplasKertas Gosok / amplasKertas Gosok / amplasKertas Gosok / amplasKertas Gosok / amplasKertas Gosok / amplasKertas Gosok / amplasKertas Gosok / amplasKertas Gosok / amplasKertas Gosok / amplasKertas Gosok / amplas40.00lbrlbr47Kunci tanam Pintu 1 x PutarKunci tanam Pintu 1 x PutarKunci tanam Pintu 1 x PutarKunci tanam Pintu 1 x PutarKunci tanam Pintu 1 x PutarKunci tanam Pintu 1 x PutarKunci tanam Pintu 1 x PutarKunci tanam Pintu 1 x PutarKunci tanam Pintu 1 x PutarKunci tanam Pintu 1 x PutarKunci tanam Pintu 1 x PutarKunci tanam Pintu 1 x PutarKunci tanam Pintu 1 x PutarKunci tanam Pintu 1 x PutarKunci tanam Pintu 1 x PutarKunci tanam Pintu 1 x Putar4.00stelstel48Engsel PintuEngsel PintuEngsel PintuEngsel PintuEngsel PintuEngsel PintuEngsel PintuEngsel PintuEngsel PintuEngsel PintuEngsel PintuEngsel PintuEngsel PintuEngsel PintuEngsel PintuEngsel Pintu6.00stelstel49Engsel JendelaEngsel JendelaEngsel JendelaEngsel JendelaEngsel JendelaEngsel JendelaEngsel JendelaEngsel JendelaEngsel JendelaEngsel JendelaEngsel JendelaEngsel JendelaEngsel JendelaEngsel JendelaEngsel JendelaEngsel Jendela12.00stelstel50Grendel JendelaGrendel JendelaGrendel JendelaGrendel JendelaGrendel JendelaGrendel JendelaGrendel JendelaGrendel JendelaGrendel JendelaGrendel JendelaGrendel JendelaGrendel JendelaGrendel JendelaGrendel JendelaGrendel JendelaGrendel Jendela6.00stelstel51Hak AnginHak AnginHak AnginHak AnginHak AnginHak AnginHak AnginHak AnginHak AnginHak AnginHak AnginHak AnginHak AnginHak AnginHak AnginHak Angin6.00stelstel52Pipa PVC 3/4"Pipa PVC 3/4"Pipa PVC 3/4"Pipa PVC 3/4"Pipa PVC 3/4"Pipa PVC 3/4"Pipa PVC 3/4"Pipa PVC 3/4"Pipa PVC 3/4"Pipa PVC 3/4"Pipa PVC 3/4"Pipa PVC 3/4"Pipa PVC 3/4"Pipa PVC 3/4"Pipa PVC 3/4"Pipa PVC 3/4"0.0LjrLjr53Pipa PVC 3"Pipa PVC 3"Pipa PVC 3"Pipa PVC 3"Pipa PVC 3"Pipa PVC 3"Pipa PVC 3"Pipa PVC 3"Pipa PVC 3"Pipa PVC 3"Pipa PVC 3"Pipa PVC 3"Pipa PVC 3"Pipa PVC 3"Pipa PVC 3"Pipa PVC 3"5.00LjrLjr54Kran air 1/2"Kran air 3/4"Kran air 3/4"Kran air 3/4"Kran air 3/4"Kran air 3/4"Kran air 3/4"Kran air 3/4"Kran air 3/4"Kran air 3/4"Kran air 3/4"Kran air 3/4"Kran air 3/4"Kran air 3/4"Kran air 3/4"Kran air 3/4"3.00unitunit55Floor drainFloor drainFloor drainFloor drainFloor drainFloor drainFloor drainFloor drainFloor drainFloor drainFloor drainFloor drainFloor drainFloor drainFloor drainFloor drain1.00unitunit56Klosed JongkokKlosed JongkokKlosed JongkokKlosed JongkokKlosed JongkokKlosed JongkokKlosed JongkokKlosed JongkokKlosed JongkokKlosed JongkokKlosed JongkokKlosed JongkokKlosed JongkokKlosed JongkokKlosed JongkokKlosed Jongkok1.00unitunit57Kabel NYA 1 x 2.5 mmKabel NYA 1 x 2.5 mmKabel NYA 1 x 2.5 mmKabel NYA 1 x 2.5 mmKabel NYA 1 x 2.5 mmKabel NYA 1 x 2.5 mmKabel NYA 1 x 2.5 mmKabel NYA 1 x 2.5 mmKabel NYA 1 x 2.5 mmKabel NYA 1 x 2.5 mmKabel NYA 1 x 2.5 mmKabel NYA 1 x 2.5 mmKabel NYA 1 x 2.5 mmKabel NYA 1 x 2.5 mmKabel NYA 1 x 2.5 mmKabel NYA 1 x 2.5 mm133.00m'm58Pipa Paralon 5/8"Pipa Paralon 5/8"Pipa Paralon 5/8"Pipa Paralon 5/8"Pipa Paralon 5/8"Pipa Paralon 5/8"Pipa Paralon 5/8"Pipa Paralon 5/8"Pipa Paralon 5/8"Pipa Paralon 5/8"Pipa Paralon 5/8"Pipa Paralon 5/8"Pipa Paralon 5/8"Pipa Paralon 5/8"Pipa Paralon 5/8"Pipa Paralon 5/8"3.00Ljrlonjor59IsolatorIsolatorIsolatorIsolatorIsolatorIsolatorIsolatorIsolatorIsolatorIsolatorIsolatorIsolatorIsolatorIsolatorIsolatorIsolator8.00bhbh60Las DopLas DopLas DopLas DopLas DopLas DopLas DopLas DopLas DopLas DopLas DopLas DopLas DopLas DopLas DopLas Dop8.00bhbh61Fiiting PlafondFiiting PlafondFiiting PlafondFiiting PlafondFiiting PlafondFiiting PlafondFiiting PlafondFiiting PlafondFiiting PlafondFiiting PlafondFiiting PlafondFiiting PlafondFiiting PlafondFiiting PlafondFiiting PlafondFiiting Plafond8.00bhbh62T. Dos PVCT. Dos PVCT. Dos PVCT. Dos PVCT. Dos PVCT. Dos PVCT. Dos PVCT. Dos PVCT. Dos PVCT. Dos PVCT. Dos PVCT. Dos PVCT. Dos PVCT. Dos PVCT. Dos PVCT. Dos PVC13.00bhbh63Saklar gandaSaklar gandaSaklar gandaSaklar gandaSaklar gandaSaklar gandaSaklar gandaSaklar gandaSaklar gandaSaklar gandaSaklar gandaSaklar gandaSaklar gandaSaklar gandaSaklar gandaSaklar ganda1.00bhbh64Saklar tunggalSaklar tunggalSaklar tunggalSaklar tunggalSaklar tunggalSaklar tunggalSaklar tunggalSaklar tunggalSaklar tunggalSaklar tunggalSaklar tunggalSaklar tunggalSaklar tunggalSaklar tunggalSaklar tunggalSaklar tunggal6.00bhbh65Stop KontakStop KontakStop KontakStop KontakStop KontakStop KontakStop KontakStop KontakStop KontakStop KontakStop KontakStop KontakStop KontakStop KontakStop KontakStop Kontak5.00bhbh

&L&"-,Italic"PNPM Mandiri PerdesaanTahun 20104050800

TOS-PagarTAKE OFF SHEETDesa:PurwoasriKecamatan:TegaldlimoKabupaten:BanyuwangiSub Kegiatan:Pemb. Pagar dan Papan NamaSKETSAPERHITUNGAN1Pekerjaan Galian Tanah PondasiPERHITUNGAN VOLUMETtKJenis Galian PondasiPanjang (P)Lebar (L)Tinggi (H)Volumem'm'm'm3IGalian Pondasi biasa < 1 m' (Pagar samping)6.000.700.702.94HIIGalian Pondasi biasa < 1 m' (Pagar Depan)14.850.700.707.280.0Jumlah Volume10.22BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsat---0.0-Tukang01.3310.220.0HOKL---0.0-Pekerja0.751.3310.2210.00HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume10.22-0.0-0.00.0Harga Sat. Pekerjaan$300,000-0.0-0.00.0HARGA SATUAN PELAKSANAAN-0.0-0.00.0Tukang0.0HOK37,5000.029,364.26/ m3Pekerja10.00HOK30,000300,000Total Harga Satuan Pekerjaan$300,0002Pekerjaan Urugan PasirPERHITUNGAN VOLUMETtKJenis UruganPanjang (P)Lebar (L)Tinggi (H)Volumem'm'm'm3IUrugan pasir bawah pondasi6.000.700.050.210.00.0Jumlah Volume0.21BAHANTENAGA KERJAHRincianKoefVolJmlsatRincianKoefKonvVolJmlsatPasir Urug1.200.210.0m3Tukang01.330.210.0HOKL-0.00.00.0-Pekerja0.31.330.210.0HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume0.21Pasir Urug0.0m365,0000.0Harga Sat. Pekerjaan0.0-0.0-0.00.0HARGA SATUAN PELAKSANAAN-0.0-0.00.0Tukang0.0HOK37,5000.00.0/ m3Pekerja0.0HOK30,0000.0Total Harga Satuan Pekerjaan0.03Pekerjaan AanstampingPERHITUNGAN VOLUMETtKJenis PekerjaanPanjang (P)Lebar (L)Tinggi (H)Volumem'm'm'm3IPasang Aanstamping Bawah Pondasi6.000.700.150.630.00.0Jumlah Volume0.63BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatPasir Urug0.300.630.0m3Tukang0.391.330.630.0HOKBatu Gebal1.200.631.00m3Pekerja0.781.330.631.00HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume0.63Pasir Urug0.0m365,0000.0Harga Sat. Pekerjaan$85,000Batu Gebal1.0m385,00085,000HARGA SATUAN PELAKSANAAN-0.0-0.00.0Tukang0.0HOK0.00.0134,920.63/ m3Pekerja1.00HOK0.00.0Total Harga Satuan Pekerjaan$85,000SKETSAPERHITUNGAN4Pekerjaan Pondasi 1 : 5PERHITUNGAN VOLUMETtKJenis PekerjaanLebar Atas (L1)Lebar Bawah (L2)Tinggi (H)Panjang (P)Volumem'm'm'm'm3IPasang Pondasi Samping0.300.700.556.001.65IIPasang Pondasi Depan0.300.700.5514.855.720.0Jumlah Volume7.37BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatBatu Gebal1.207.379.00m3Tukang0.61.337.376.00HOKPasir Pasang0.547.374.00m3Pekerja1.51.337.3715.00HOKSemen PC @50 Kg3.407.3725.00zakHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume7.37Batu Gebal9.0m385,000765,000Harga Sat. Pekerjaan$3,100,000Pasir Pasang4.0m390,000360,000HARGA SATUAN PELAKSANAANSemen PC @50 Kg25.0zak52,0001,300,000Tukang6.00HOK37,500225,000420,781.16/ m3Pekerja15.00HOK30,000450,000Total Harga Satuan Pekerjaan$3,100,0005Pekerjaan Pasangan Tembok Camp. 1 Pc : 5 PsPERHITUNGAN VOLUMETtKJenis PekerjaanPanjangTinggiVolumem'm'm2IPas. bata merah Pagar samping6.001.509.00IIPas. Bata merah pagar depan14.851.0014.85IIIPas. Bata merah rollag20.850.2510.43Jumlah Volume34.28BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatBata merah70.0034.282,399bhTukang0.101.3334.285.00HOKPasir Pasang0.04534.282.00m3Pekerja0.301.3334.2814.00HOKSemen PC 50 kg0.19334.287.00zakHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume34.28Bata merah2,399bh4501,079,600Harga Sat. Pekerjaan$2,231,100Pasir Pasang2.0m390,000180,000HARGA SATUAN PELAKSANAANSemen PC 50 kg7.0zak52,000364,000Tukang5.00HOK37,500187,50065,094.09/ m2Pekerja14.00HOK30,000420,000Total Harga Satuan Pekerjaan$2,231,1006Pekerjaan PlesteranPERHITUNGAN VOLUMETtKJenis PekerjaanVol Pas Bt merahLuas untukVolumeKETERANGAN :m2Luar & Dalamm2Luasan Volume Pekerjaan PlesteranIPlesteran dinding Pagar samping9.002.0018.00adalah 2 x Luas Vol Pas. Bata merahIIPlesteran dinding pagar depan14.852.0029.70Jumlah Volume47.70BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatPasir Pasang0.02647.701.00m3Tukang0.151.3347.7010.00HOKSemen PC 50 kg0.10447.705.00zakPekerja0.301.3347.7019.00HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume47.70Pasir Pasang1.0m390,00090,000Harga Sat. Pekerjaan$1,295,000Semen PC 50 kg5.0zak52,000260,000HARGA SATUAN PELAKSANAANTukang10.00HOK37,500375,00027,148.85/ m2Pekerja19.00HOK30,000570,000Total Harga Satuan Pekerjaan$1,295,0007Pekerjaan Batu Alam1Memasang batu alamPERHITUNGAN VOLUMETtkJenis PekerjaanJumlahLebarTinggiVolumeKolomm'm'm2IIPasang beton alur9.000.401.455.220.0Jumlah Volume5.22BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatBeton alur 20/401.1005.226.00m2Tukang0.351.335.222.00HOKSemen PC @ 50 kg0.1505.221.00zakPekerja0.701.335.225.00HOKPasir pasang0.0355.220.0m3SKETSAPERHITUNGANHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume5.22Beton alur 20/406.00m280,000480,000Harga Sat. Pekerjaan$757,000Semen PC @ 50 kg1.00zak52,00052,000HARGA SATUAN PELAKSANAANPasir pasang0.0m390,0000.0Tukang2.00HOK37,50075,000Beton alur 20/40118,487/m2Pekerja5.00HOK30,000150,000Total Harga Satuan Pekerjaan$757,0008Pekerjaan benangan dan ban - bananPERHITUNGAN VOLUMETtkJenis PekerjaanPanjangVolumem'm'IBenangan Kolom81.0081.00IIBenangan sudut tembok41.7041.70Jumlah Volume122.70BAHANTENAGA KERJARincianKoefVolJmlsatRincianKoefKonvVolJmlsatSemen PC @ 50 kg0.0068122.701.00zakTukang0.0671.33122.7011.00HOKPasir pasang0.001122.700.0m3Pekerja0.1331.33122.7022.00HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume122.70Semen PC @ 50 kg1.00zak52,00052,000Harga Sat. Pekerjaan$1,124,500Pasir pasang0.0m390,0000.0HARGA SATUAN PELAKSANAANTukang11.00HOK37,500412,500Pekerja22.00HOK30,000660,0009,164.63/ m'Total Harga Satuan Pekerjaan$1,124,5009Pekerjaan Pengecatan1Mengecat tembok PagarPERHITUNGAN VOLUMEBAHANTtKJenis PekerjaanVolumeRincianKoefVolJmlsatm2Plamir tembok0.1020.702kgIPengecatan Tembok Pgr Samping18.00Cat dasar0.10020.702.00kgIIPengecatan Tembok Pgr Depan2.70Cat penutup 2x0.26020.705.00kgKertas gosok0.05020.701.00lbrTENAGA KERJAJumlah Volume20.70RincianKoefKonvVolJmlsatTukang0.0631.3320.702.00HOKPekerja0.0201.3320.701.00HOKHARGA SATUAN PEKERJAANKETERANGANRincianJmlsatHarga SatJumlahVolume20.70Plamir tembok2kg20,00040,000Harga Sat. Pekerjaan$274,000Cat dasar2.0kg18,00036,000HARGA SATUAN PELAKSANAANCat penutup 2x5.0kg18,00090,000Kertas gosok1.0lbr3,0003,00013,236.71/ m2Tukang2.00HOK37,50075,000Pekerja1.00HOK30,00030,000Total Harga Satuan Pekerjaan$274,00010Pembuatan Pagar BesiHARGA SATUAN PEKERJAANRincianLuassatHarga SatJumlahMembuat Pagar dan Pintu Besi dengan menggunakan Besi Kotak6.65m2125,000830,900Mengecat Pagar Besi1.00Unit300,000300,000Memasang Pagar Besi1.00Unit150,000150,000Total Harga Satuan Pekerjaan$1,280,900REKAPITULASI BAHAN DAN UPAHBAHANTENAGA KERJANOJENIS BAHANVOLUMESATUANNOTENAGA KERJAVOLUMESATUAN1Pasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/CorPasir Pasang/Cor7.00m3m31Tukang36.0HOK2Batu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Kali/Gunung/GebalBatu Ka