rab dak 2015

126
DAFTAR HARGA SATUAN UPAH No. Uraian Satuan Kode Harga Satuan (Rp) 1 2 3 4 4 1 Buruh Tak Terampil OH U.1 75,000.00 2 Buruh Semi Terampil OH U.2 80,000.00 3 Buruh Terampil OH U.3 85,000.00 4 Pekerja OH U.4 75,000.00 5 Mandor Pekerja OH U.5 125,000.00 6 Tukang Batu OH U.6 110,000.00 7 Kepala Tukang Batu OH U.7 120,000.00 8 Tukang Kayu OH U.8 110,000.00 9 Kepala Tukang Kayu OH U.9 120,000.00 10 Tukang Besi Beton OH U.10 110,000.00 11 Kepala Tukang Besi Beton OH U.11 120,000.00 12 Tukang Las OH U.12 115,000.00 13 Kepala Tukang Las OH U.13 125,000.00 14 Tukang Politur OH U.14 110,000.00 15 Tukang Cat OH U.15 110,000.00 16 Kepala Tukang Cat OH U.16 120,000.00 17 Tukang Pipa OH U.17 110,000.00 18 Pemecah Batu OH U.18 80,000.00 19 Jaga Malam OH U.19 80,000.00 20 Penggergaji OH U.20 80,000.00 21 Penggosok Tegel OH U.21 75,000.00 22 Penganyam Bronjong OH U.22 110,000.00 23 Kepala Penganyam Bronjong OH U.23 120,000.00 24 Pemasak Aspal/Buruh Terampil OH U.24 80,000.00 25 Sopir OH U.25 100,000.00 26 Pembantu Sopir OH U.26 90,000.00 27 Mekanik OH U.27 110,000.00 28 Mekanik Pembantu OH U.28 100,000.00 29 Operator Alat Ringan OH U.29 100,000.00 30 Operator Alat Berat OH U.30 110,000.00 31 Pembantu Operator OH U.31 100,000.00 32 Operator Pompa TL OH U.32 75,000.00

Upload: jefry-aja

Post on 30-Sep-2015

75 views

Category:

Documents


3 download

DESCRIPTION

RAB Pekerjaan Bangunan

TRANSCRIPT

BhnDAFTAR HARGA SATUAN UPAHNo.UraianSatuanKodeHarga Satuan (Rp)Keterangan1234461Buruh Tak TerampilOHU.175,000.002Buruh Semi TerampilOHU.280,000.003Buruh TerampilOHU.385,000.004PekerjaOHU.475,000.005Mandor PekerjaOHU.5125,000.006Tukang BatuOHU.6110,000.007Kepala Tukang BatuOHU.7120,000.008Tukang KayuOHU.8110,000.009Kepala Tukang KayuOHU.9120,000.0010Tukang Besi BetonOHU.10110,000.0011Kepala Tukang Besi BetonOHU.11120,000.0012Tukang LasOHU.12115,000.0013Kepala Tukang LasOHU.13125,000.0014Tukang PoliturOHU.14110,000.0015Tukang CatOHU.15110,000.0016Kepala Tukang CatOHU.16120,000.0017Tukang PipaOHU.17110,000.0018Pemecah BatuOHU.1880,000.0019Jaga MalamOHU.1980,000.0020PenggergajiOHU.2080,000.0021Penggosok TegelOHU.2175,000.0022Penganyam BronjongOHU.22110,000.0023Kepala Penganyam BronjongOHU.23120,000.0024Pemasak Aspal/Buruh TerampilOHU.2480,000.0025SopirOHU.25100,000.0026Pembantu SopirOHU.2690,000.0027MekanikOHU.27110,000.0028Mekanik PembantuOHU.28100,000.0029Operator Alat RinganOHU.29100,000.0030Operator Alat BeratOHU.30110,000.0031Pembantu OperatorOHU.31100,000.0032Operator Pompa TLOHU.3275,000.00DAFTAR HARGA SATUAN BAHANNo.UraianSatuanKodeHarga Satuan (Rp)Keterangan123446A. BAHAN PASANGAN1Batu Kali Alamm3P.1125,000.002Batu Kali Belahm3P.2125,000.003Batu Kali Keping/Tempelm3P.3178,000.004Kerikil Alam 5 - 7 cmm3P.4200,000.005Kerikil Pecah 5 - 7 cmm3P.50.06Kerikil Pecah 5 - 7 cm (M)m3P.6200,000.007Kerikil Pecah 5 - 7 cm (MSC)m3P.7250,000.008Kerikil Alam 3 - 5 cmm3P.80.09Kerikil Pecah 3 - 5 cmm3P.90.010Kerikil Pecah 3 - 5 cm (M)m3P.10275,000.0011Kerikil Pecah 3 - 5 cm (MSC)m3P.11260,000.0012Kerikil Alam 2 - 3 cmm3P.12279,000.0013Kerikil Pecah 2 - 3 cmm3P.130.014Kerikil Pecah 2 - 3 cm (M)m3P.14279,000.0015Kerikil Pecah 2 - 3 cm (MSC)m3P.15285,000.0016Kerikil Alam 1 - 2 cmm3P.16250,000.0017Kerikil Pecah 1 - 2 cmm3P.17265,000.0018Kerikil Pecah 1 - 2 cm (M)m3P.18265,000.0019Kerikil Pecah 1 - 2 cm (MSC)m3P.19382,500.0020Pasir Betonm3P.20175,000.0015021Pasir pasangm3P.21160,000.00133.333333333322Pasir Urugm3P.22119,000.0023Tanah urugm3P.2350,000.0024Kapur Gamping/LaburKgP.242,450.0025Kapur PasangKgP.251,000.0026Batu Bata Kls IBuahP.26550.0027Batu Bata Kls IIBuahP.27495.0028Semen WarnaKgP.2812,000.0029PC. Merk Tiga Roda (50 Kg)ZakP.2965,000.0030PC. Merk Gresik (50 Kg)ZakP.3065,000.0031PC. Merk Tonasa (50 Kg)ZakP.3165,000.0032PC. Merk Padang (50 Kg)ZakP.3265,000.0033PC. Merk Bosowa (50 Kg)ZakP.3364,000.0034FullerKgP.3415,000.0035Tanah Urug Pilihanm3P.3550,000.0036Sirtum3P.36107,500.00B. BAHAN ATAP37Sirap KalimantanBuahA.12,000.0038Genteng LokalBuahA.22,400.0039Genteng Bubungan LokalBuahA.32,550.0040Genteng Beton/PressBuahA.45,500.0041Genteng Bubungan BetonBuahA.55,800.0042Genteng Silang/KodokBuahA.63,500.0043Genteng Bubungan SilangBuahA.73,600.0044Genteng PejatenBuahA.83,000.0045Genteng Bubungan PejatenBuahA.93,900.0046Genteng Multi RoofBuahA.9a45,000.0047Bubungan Multi RoofBuahA.9b35,000.0048AluminiumBuahA.1022,000.0049PolykarbonatLbrA.10a2,600,000.0050Main truss C-75-75mA.10.110,714.2951Roof Bottom/Reng R 33-0.45mA.10.28,500.0052Self drilling screw dia 6 x 20 mm (truss Screw)BhA.10.3375.0053Self drilling screw dia 4 x 16 mm (Roof Bottom Screw)BhA.10.4350.0054Dynabol dia 12 x 120 mmBhA.10.51,500.0055Genteng KeramikBuahA.1113,000.0056Genteng Bubungan KeramikBuahA.1213,300.0057Ijuk AtapKgA.1320,500.0058Asbes Gelombang KecilLembarA.1436,000.0059Asbes Plat 5mmLembarA.14a46,700.0060Asbes Gelombang BesarLembarA.15120,500.0061Asbes Bubungan Gelombang KecilLembarA.1631,000.0062Asbes bubungan Gelombang BesarLembarA.1765,000.0063Seng Gelombang Besar BJLS 20LembarA.1848,500.0064Seng Gelombang Besar BJLS 25LembarA.1958,500.0065Seng Gelombang Besar BJLS 30LembarA.2065,500.0066Seng Gelombang Kecil BJLS 20LembarA.2155,500.0067Seng Plastik BJLS 20LembarA.2247,200.0068Seng Plat BJLS 25LembarA.2345,500.0069Seng Plat BJLS 30LembarA.2465,500.0070Karet Talangm'A.258,500.0071Genteng Press Tanah LiatBuahA.26800.0072Bubungan Genteng Press Tanah LiatBuahA.272,500.0073Atap Spandekm2A.2875,000.0074Bubungan Spandekm'A.2965,500.00C. BAHAN KAYU75Papan Kayu Kls Im3K.112,500,000.0076Balok Kayu Kls Im3K.210,000,000.0077Papan Kayu Kls IIm3K.35,150,000.0078Balok Kayu Kls IIm3K.44,250,000.0079Papan Kayu Kls IIIm3K.53,250,000.0080Balok Kayu Kls IIIm3K.62,500,000.0081Kayu TerentangBuahK.70.082Kayu Borneom3K.80.083Dolken/Perancah Diameter 10 cmBatangK.931,500.0084List Kacam'K.106,500.00D. BAHAN BAMBU85Bambu Besar 12.5 cm - 6 mBatangB.120,000.0086Bambu Sedang 10 cm - 6 mBatangB.217,500.0087Bambu Kecil 7cm - 6 mBatangB.315,000.0088Bedek Kulitanm2B.436,500.0089Bedek Biasam2B.535,000.0090Bedek Pagarm2B.628,500.00E. BAHAN CETAK91Lubang Angin 10 x 20 cmBuahC.17,600.0092Lubang Angin 20 x 20 cmBuahC.28,000.0093Lubang Angin 30 x 30 cmBuahC.39,500.0094Buis Beton Diameter 10 cmBuahC.450,000.0095Buis Beton Diameter 20 cmBuahC.557,500.0096Buis Beton Diameter 40 cmBuahC.681,000.0097Buis Beton Diameter 60 cmBuahC.7100,500.0098Buis Beton Diameter 80 cmBuahC.8130,000.0099Roster BetonBuahC.93,500.00F. BAHAN LANTAI100Tegel Abu-abu 20x20 cmm2LT.145,400.00101Tegel Bergaris Abu-abu 20x20 cmm2LT.253,000.00102Tegel Warna 20x20 cmm2LT.358,600.00103Tegel Bergaris Warna 20x20 cmm2LT.458,600.00104Tegel Trasi Klas I 30x30 cmm2LT.561,300.00105Tegel Trasi Klas II 30x30 cmm2LT.657,000.00106Keramik Dindingm2LT.782,500.00107Tegel Keramik Kualitas Im2LT.885,000.00108Tegel Keramik Kualitas IIm2LT.980,000.00109Porselin Kualitas I (Polos)m2LT.1052,500.00110Porselin Kualitas I (motif)m2LT.1173,500.00111Porselin Kualitas II (motif)m2LT.12367,500.00112Marmer Kualitas Im2LT.13401,250.00113Marmer Kualitas IIm2LT.14281,410.00114Paving Block Tipe BataBuahLT.152,700.00115Paving Block Tipe Tiga BerlianBuahLT.162,800.0070,000.00116KerebBuahLT.1722,000.00G. BAHAN BESI117Besi Beton UlirKgBS.115,200.00118Besi Beton PolosKgBS.213,200.00119Besi Siku 70.70.7 mmKgBS.316,400.00120Pagar Kawat BRC 2.4 x 0.9 mBuahBS.4787,500.00121Pintu Pagar BRC 1.5 x 3 mBuahBS.53,360,000.00122Besi Profil/WFKgBS.619,000.00123Plat Baja Tebal 2 mmm2BS.7252,000.00124Besi Canal CKgBS.816,400.00125Kawat Ikat BetonKgBS.923,000.00126Kawat Nyamuk Besim2BS.1023,000.00127Kawat Nyamuk Plastikm2BS.1118,000.00128Kawat Saringan Pasirm2BS.1220,700.00129Kawat DuriRolBS.13122,000.00130Kawat HarmonikaKgBS.1431,500.00131Kawat Bronjong Digalvanisir 3 mmKgBS.1529,000.00132Kawat Bronjong Digalvanisir 4 mmKgBS.1629,000.00133Plat Alumunium 1.5 mmLembarBS.170.0134Plat Besi 1.5 mmLembarBS.180.0135Besi streepKgBS.1916,400.00136Mesin GergajiUnitBS.202,000,000.00137Mesin LasUnitBS.2110,000,000.00138Mesin BorUnitBS.222,500,000.00139Mata GergajiBhBS.2335,000.00140Elektroda Jenis LBKotakBS.24350,000.00141Mata BorBhBS.2545,000.00142Gas ActylintBtlBS.26120,000.00143OxigenBtlBS.2735,000.00144Mesin Potong PlatUnitBS.282,500,000.00145Konstruksi Atap Metal Trussm2BS.29201,371.00H. BAHAN LANGIT-LANGIT1Eternit 100 x 100 cmLembarLG.121,500.002Tripleks 120 x 240 x 2 mmLembarLG.245,000.003Tripleks 120 x 240 x 3 mmLembarLG.355,000.004Tripleks 120 x 240 x 6 mmLembarLG.494,500.005Tripleks 120 x 240 x 9 mmLembarLG.5156,500.006Tripleks 120 x 240 x 12 mmLembarLG.6198,500.007Kalsiboard 3.5mmLembarLG.6a70,000.008Plywood 60 x 120 x 6 mmLembarLG.762,500.009Plywood 60 x 120 x 4 mmLembarLG.7a37,500.0010Plywood 120 x 240 x 4 mmLembarLG.7b82,500.0011Plat Aluminium 200 x 100 x 0,6 mmLembarLG.7c110,000.0012Plat Aluminium 200 x 100 x 0,9 mmLembarLG.7d150,000.0013Teakwood 120 x 240 x 3 mmLembarLG.881,300.0014Formika Putih 120 x 240 x 2 mmLembarLG.9158,710.0015Formika Warna 120 x 240 x 3 mmLembarLG.10215,580.0016Lem KayuKgLG.1150,000.00I. BAHAN KACA17Kaca Polos 3 mmm2KC.190,860.0018Kaca Polos 5 mmm2KC.2124,700.0019Kaca Riben 3 mmm2KC.3115,200.0020Kaca Riben 5 mmm2KC.4143,600.0021Kerangka Nako 5 mmm2KC.587,500.0022Kaca DOP/Kaca Esm2KC.6154,300.0023Kaca Pateri/Motifm2KC.788,200.0024Glass BlockBuahKC.822,500.0025Alumunium 4/10 mmmKC.980,000.0026Alumunium 3/8 mmmKC.1065,000.0027Alumunium 3/4 mmmKC.1145,000.00J. BAHAN FINISHING28Amplas KayuLembarFN.15,640.0029Plamir KayuKgFN.225,680.0030SpritusLiterFN.316,190.0031Minyak CatLiterFN.415,280.0032Minyak Cat A SpesialLiterFN.520,000.0033ResiduLiterFN.618,830.0034Teak Oil/Minyak BakestingLiterFN.747,580.0035Meni BesiKgFN.832,300.0090.98375M3ANL_A.136Meni KayuKgFN.925,360.0022.7459375M3ANL_A.937Cat Kayu Mutu MenengahKgFN.1045,000.000M3ANL_A.1038Cat Kayu Mutu TinggiKgFN.1175,000.008.27125M3ANL_A.1139Cat Tembok Mutu MenengahKgFN.1215,000.00140008.27125M3ANL_A.1240Cat Tembok Mutu TinggiKgFN.1335,000.004000089.584M3ANL_B.341Cat GentengKgFN.13a60,000.0033.085M3ANL_B.442Cat BesiKgFN.14130,000.00619.18592M2ANL_C.743Plamir TembokKgFN.1516,500.0044BhRoster44TeerKgFN.1611,700.009.94M3ANL_D.10a45PoliturLiterFN.1761,000.005.6475M3ANL_D.1146Cat Marka Jalan ScalatoKgFN.1878,860.006.8782M3ANL_D.1247Cat Marka Jalan BiasaKgFN.19200,090.00201M'ANL_D.1448Cat Marka Jalan 1 Scot LideKalengFN.200.0322M'ANL_D.1549KuasBuahFN.2119,200.006.5304M3ANL_D.1950Batu ApungKgFN.220.04.242M3ANL_D.2051Soda ApiKgFN.2330,000.009.6M2ANL_E.152Politur DasarLiterFN.2461,000.0011.0544M2ANL_E.353List KayuM'FN.2510,000.000M2ANL_E.454AmplasLembarFN.265,640.000.873216M3ANL_E.1055Rol CatBuahFN.2712,000.00226.23M2ANL_E.18b56Dempul kayuKgFN.2824,000.0061.8M'ANL_E.2357SodaKg0.07BhPT KMK. BAHAN SANITAIRE31.1916m2KC MT58Kloset DudukBuahSN.12,810,000.001238.37184M2ANL_F.459Kloset Jongkok TerasoBuahSN.2100,300.00327.76M2ANL_G.660Kloset Jongkok PorselenBuahSN.3181,900.00437.71M1ANL_G.761WastafelBuahSN.41,712,000.0018M2ANL_H.362Urinoir PorselenBuahSN.51,926,000.00306.725M2ANL_H.563Saringan Air BesiBuahSN.684,530.00299.922M2ANL_H.664Saringan Air PlastikBuahSN.718,400.00136.344M2ANL_I.965Bak Cuci Piring TerasoBuahSN.8278,000.00255.6M2ANL_I.1366Bak Cuci Piring LogamBuahSN.9398,000.00391.944M2-67Reservoir Fiberglass Kap. 1 m3BuahSN.101,400,000.006BhANL_J.168Septic Tank Kapasitas 1 m3BuahSN.114,531,450.002BhANL_J.769Septic Tank Kapasitas 2 m3BuahSN.126,473,500.006BhANL_J.870Sumur Resapan Kap. 3m3BuahSN.12a3,745,000.003Bh-71Bak Fiberglass Kap. 0.5 m3BuahSN.13294,500.001238.37184M2ANL_L.572Bak Mandi Plastik Kap. 0.5 m3BuahSN.14398,000.00327.76M2ANL_L.573Bak Mandi Teraso Kap. 50x50 cmBuahSN.15436,100.0074Kran Air 3/4" KW IBuahSN.1626,200.0075Kran Air 3/4" KW IIBuahSN.1716,000.0076Kran Air 1/4" KW IBuahSN.1842,000.0077Kran Air 1/4" KW IIBuahSN.1918,000.0078Kran Air Steanless 1/2"BuahSN.19a104,800.0079Seal TipeBuahSN.203,000.0080Floor DrainBuahSN.2118,000.0081ShowerBuahSN.2278,700.00L. BAHAN PAKU82Paku Panjang 1 - 3 cmKgPK.121,700.0083Paku Panjang 4 - 6 cmKgPK.216,000.0084Paku Panjang 7 - 12 cmKgPK.316,000.0085Paku SengKgPK.430,100.0086Paku Triplek/AsbesKgPK.530,000.0087Sekrup/Piles 1.5 cmDozPK.69,200.0088Sekrup/Piles 2.0 cmDozPK.711,700.0089Paku SumbatBuahPK.826,750.0090Besi Beugel/Baut (Kuda-kuda)KgPK.927,820.0091Paku Anti KaratKgPK.1028,000.0092Baut Seng 2 cmKotakPK.110.093Baut Seng 2.5 cmKotakPK.120.094Baut Seng 3 cmKotakPK.130.0M. BAHAN INSTALASI LISTRIK95Titik LampuBuahIL.1253,500.0096Stop Kontak TanamBuahIL.2203,500.0097Stop Kontak LuarBuahIL.3193,500.0098Saklar Engkel ( Philip )BuahIL.423,500.0099Saklar Ganda ( Philip )BuahIL.528,500.00100Zakering Boxes 1 GroupBuahIL.6273,500.00101Zakering Boxes 2 GroupBuahIL.7353,500.00102Zakering Boxes 3 GroupBuahIL.8433,500.00103Lampu Pijar5 dan 10 Watt (Philips)BuahIL.97,800.00104Lampu Pijar15, 25 dan 40 Watt (Philips)BuahIL.107,000.00105Lampu Pijar60, 75 dan 100 Watt (Philips)BuahIL.118,500.00106Lampu PijarJenis Cabe 25 Watt (Philips)BuahIL.127,000.00107Lampu TL 10 Watt (Philips)BuahIL.1332,000.00108Lampu TL20 Watt (Philips)BuahIL.1436,000.00109Lampu TL2 x 20 Watt (Philips)BuahIL.1598,000.00110Lampu TL40 Watt (Philips)BuahIL.16154,000.00111Lampu Circle 20 Watt (Philips)BuahIL.1747,000.00112Lampu Circle 32 Watt (Philips)BuahIL.180.0113Lampu Spot Light 220 Volt 100 Watt (Philips)BuahIL.1991,800.00114Lampu Spot Light 220 Volt 150 Watt (Philips)BuahIL.20115,800.00115Lampu Spot Light 220 Volt 500 Watt (Philips)BuahIL.210.0116Lampu Spot Light 220 Volt 1000 Watt (Philips)BuahIL.220.0117Lampu TamanBuahIL.2391,800.00118MCB 10 - 16 A (BBC)BuahIL.2426,200.00119MCB 25 - 35 A (BBC)BuahIL.2535,400.00120MCB 63 A (BBC)BuahIL.26283,400.00121Magnetic Switch (Philips)BuahIL.27465,000.00122Fitting TempelBuahIL.288,500.00123Fitting GantungBuahIL.295,200.00124Kabel Senur NYM Uk. 2.5 (Olimpyc)mIL.301,200.00125Kabel NYM Uk. 2 x 2.5 (LKM)mIL.312,600.00126Kabel NYM Uk. 2 x 4.0 (LKM)mIL.324,600.00127Kabel NYM Uk. 4 x 4.0 (LKM)mIL.337,800.00128Kabel NYM Uk. 3 x 2.5 (LKM)mIL.349,200.00129Kabel NYM Uk. 4 x 6.0 (LKM)mIL.3515,000.00130Kabel NYM Uk. 4 x 10 (LKM)mIL.3619,900.00131Connector RJ-45 (AMP/Orang)BuahIL.3716,500.00132Instalasi WorkstationTitikIL.38118,100.00133Listrik Penerangan Jalan Lampu Merkuri (HPL) 250 WattBuahIL.39137,700.00134Listrik Penerangan Jalan Lampu HPIT 400 WattBuahIL.40160,500.00135Listrik Penerangan Jalan Lampu Halogen 300 WattBuahIL.4178,700.00136Photo Cell Selcom (3 - 6 A)BuahIL.42144,500.00137Pipa Galvanis Diameter 3/4"BuahIL.43125,000.00138Pipa Galvanis Diameter 1"BuahIL.44164,000.00139Pipa Galvanis Diameter 1.5"BuahIL.45223,100.00140Pipa Galvanis Diameter 2"BuahIL.46285,100.00141Kap Lampu Terbuka 250 WattBuahIL.47118,200.00142Kap Lampu Tertutup 250 WattBuahIL.48121,200.00143Tiang Lampu RS 9BuahIL.491,050,000.00144Tiang Lampu RS 7BuahIL.50801,200.00145Aspal (AC)KgIL.514,950.00146Kayu Bakarm3IL.52115,500.00147Oli SAE 30LiterIL.5320,350.00148Oli SAE 40LiterIL.5419,250.00149Oli SAE 90LiterIL.5522,550.00150Oli SAE 100LiterIL.5625,410.00151Aspal EmulsiKgIL.575,225.00152Flux OilLiterIL.582,310.00153Alat Bantu Bina MargaSetIL.5928,875.00154Alat Bantu PengairanSetIL.6040,425.00155Alat Bantu BangunanSetIL.6163,525.00156Alat Bantu PerpipaanSetIL.6257,750.00157Sambungan Rumah 1/2"SetIL.631,018,700.00158Sambungan Rumah 3/4"SetIL.641,501,500.00159Sambungan Rumah 1"SetIL.652,021,200.00160SolarLiterIL.666,000.00PIPA161Pipa GIP Diameter 1"mPP.143,870.00162Pipa GIP Diameter 1/2"mPP.1a33,170.00163Pipa GIP Diameter 1.5"mPP.265,270.00164Pipa GIP Diameter 2"mPP.3112,380.00165Pipa GIP Diameter 2,5"mPP.3a0.0166Pipa GIP Diameter 3"mPP.4186,060.00241,878.00167Pipa GIP Diameter 4"mPP.5295,320.00168Pipa GIP Diameter 6"mPP.6480,000.00169Pipa GIP Diameter 8"mPP.7807,000.00170Pipa GIP Diameter 10"mPP.81,134,000.00171Pipa GIP Diameter 12"mPP.91,413,000.00172Pipa ACP Diameter 6"mPP.10109,250.00173Pipa ACP Diameter 8"mPP.11202,400.00174Pipa ACP Diameter 10"mPP.12236,900.00175Pipa ACP Diameter 12"mPP.13366,850.00176Pipa PVC Diameter 1"mPP.1411,500.00177Pipa PVC Diameter 3/4"mPP.14a7,700.00178Pipa PVC Diameter 1/2"mPP.14b6,000.00179Pipa PVC Diameter 1.5"mPP.1536,500.00180Pipa PVC Diameter 2"mPP.1686,900.00181Pipa PVC Diameter 3"mPP.17118,000.00182Pipa PVC Diameter 4"mPP.181,367,010.00183Pipa PVC Diameter 6"mPP.19288,300.00184Pipa PVC Diameter 8"mPP.20390,800.00185Pipa PVC Diameter 10"mPP.21710,620.00186Pipa PVC Diameter 12"mPP.221,164,000.00187Pipa PVC Diameter 14"mPP.231,656,750.00188Pipa PVC Diameter 16"mPP.242,098,000.00189Pipa Besi 1.5" TipisBatangPP.250.0190Pipa 2" TebalBatangPP.260.0191Pipa 3" TebalBatangPP.270.0192Pipa Besi 1.5" TipisBatangPP.280.0193Pipa 2" TipisBatangPP.290.0194Pipa 2.5" TipisBatangPP.300.0195Pipa 2.5" TipisBatangPP.310.0196Pipa 3" TipisBatangPP.320.0ACCESSORIES197DN 200 x 200 mmBuah1,796,000.00198DN 200 x 150 mmBuah1,769,000.00199DN 200 x 100 mmBuah1,678,300.00200DN 200 x 75 mmBuah1,587,600.00201DN 200 x 50 mmBuah1,497,000.00202DN 150 x 150 mmBuah927,000.00203DN 150 x 100 mmBuah802,200.00204DN 150 x 75 mmBuah771,000.00205DN 150 x 50 mmBuah680,400.00206DN 100 x 100 mmBuah447,300.00207DN 100 x 75 mmBuah442,000.00208DN 100 x 50 mmBuah442,600.00209DN 75 x 75 mmBuah347,700.00210DN 75 x 50 mmBuah309,200.00211DN 50 x 50 mmBuah250,400.00B. Bend Socket Spigot PVC (RRJ)212DN 200 - 90Buah840,800.00213DN 200 - 45Buah556,300.00214DN 150 - 90Buah469,900.00215DN 150 - 45Buah342,200.00216DN 100 - 90Buah169,400.00217DN 100 - 45Buah122,000.00218DN 75 - 90Buah108,600.00219DN 75 - 45Buah80,400.00220DN 50 - 90Buah49,680.00221DN 50 - 45Buah39,360.00C. Reducer Double Socket Spigot PVC (RRJ)222DN 200 x 200 mmBuah665,600.00223DN 200 x 150 mmBuah35,700.00224DN 150 x 100 mmBuah187,900.00225DN 150 x 90 mmBuah190,000.00226DN 100 x 75 mmBuah99,960.00227DN 100 x 50 mmBuah100,800.00228DN 75 x 50 mmBuah64,200.00D. Water Meter Flange229DN. 300 mmBuah27,216,000.00230DN. 250 mmBuah27,216,000.00231DN. 200 mmBuah10,161,600.00232DN. 150 mmBuah8,164,800.00233DN. 100 mmBuah5,080,000.00234DN. 75 mmBuah3,992,400.00235DN. 50 mmBuah3,266,400.00E. Flange Socket PVC (RRJ)236DN. 350 mm (For Steel)Buah1,770,000.00237DN. 300 mm (For PVC)Buah1,707,500.00238DN. 250 mm (For PVC)Buah998,400.00239DN. 200 mm (For PVC)Buah618,000.00240DN. 150 mm (For PVC)Buah380,400.00241DN. 100 mmBuah214,200.00242DN. 75 mmBuah171,600.00243DN. 50 mmBuah114,000.00244F. Cap/Drop PVC (SCJ)245DN. 150 mmBuah60,500.00246DN. 100 mmBuah31,200.00247DN. 75 mmBuah22,200.00248DN. 50 mmBuah12,000.00G. Cap/Drop PVC (PVC)249DN. 150 mmBuah213,600.00250DN. 100 mmBuah99,900.00251DN. 75 mmBuah71,400.00252DN. 50 mmBuah42,800.00H. All Flange Bend CI253DN 350 - 90Buah1,212,000.00254DN 350 - 45Buah1,118,400.00255DN 350 - 22.5Buah773,400.00256DN 350 - 11.5Buah685,800.00257DN 300 - 90Buah909,000.00258DN 300 - 45Buah829,800.00259DN 300 - 22.5Buah637,800.00260DN 300 - 11.5Buah569,400.00261DN 250 - 90Buah755,400.00262DN 250 - 45Buah696,000.00263DN 200 - 90Buah489,600.00264DN 200 - 45Buah469,800.00265DN 200 - 22.5Buah282,000.00266DN 150 - 90Buah350,400.00267DN 150 - 45Buah344,400.00H. All Flange Tee CI268DN 300 x 300 mmBuah1,025,400.00269DN 250 x 250 mmBuah815,400.00270DN 250 x 150 mmBuah735,000.00271DN 250 x 100 mmBuah692,400.00272DN 200 x 200 mmBuah559,200.00273DN 200 x 75 mmBuah474,000.00274DN 200 x 50 mmBuah452,400.00275DN 150 x 150 mmBuah333,600.00276DN 150 x 100 mmBuah313,800.00277DN 150 x 75 mmBuah294,600.00278DN 150 x 50 mmBuah261,600.00I. All Flange Reducer CI279DN 300 x 300 mmBuah722,400.00280DN 300 x 250 mmBuah598,200.00281DN 300 x 200 mmBuah513,600.00282DN 250 x 200 mmBuah373,200.00283DN 250 x 150 mmBuah354,000.00284DN 200 x 100 mmBuah341,500.00285DN 200 x 75 mmBuah306,000.00286DN 200 x 50 mmBuah252,600.00287DN 150 x 100 mmBuah165,600.00J. Flange Spigot CI For ACP288DN 250 mmBuah104,600.00289DN 200 mmBuah210,000.00290DN 150 mmBuah142,200.00K. Dresseer Joint CI For Steel/PVC/ACP291DN. 350 mm (For Steel)Buah1,299,200.00292DN. 300 mm (For PVC)Buah844,800.00293DN. 250 mm (For PVC)Buah649,600.00294DN. 200 mm (For PVC)Buah355,200.00295DN. 150 mm (For PVC)Buah252,000.00296DN. 100 mm (For PVC)Buah168,600.00297DN. 75 mm (For PVC)Buah133,200.00298DN. 65 mm (For PVC)Buah111,000.00299DN. 50 mm (For PVC)Buah88,800.00300DN. 250 mm (For ACP)Buah915,000.00301DN. 200 mm (For ACP)Buah358,800.00302DN. 150 mm (For ACP)Buah254,400.00L. Flange Bend CI303DN 250 mmBuah62,400.00304DN 150 mmBuah45,600.00305DN 75 mmBuah36,000.00M. Air Valve306DN 75 mmBuah1,545,000.00307DN 50 mmBuah888,000.00308DN 25 mmBuah542,400.00N. Clame Sadle CI For PVC Pipe309DN 350 x 75 mmBuah205,400.00310DN 250 x 75 mmBuah187,500.00311DN 200 x 75 mmBuah174,600.00312DN 150 x 75 mmBuah177,000.00313DN 200 x 50 mmBuah172,800.00314DN 150 x 50 mmBuah156,000.00315DN 150 x 25 mmBuah237,400.00316DN 100 x 25 mmBuah54,600.00317DN 75 x 25 mmBuah48,000.00318DN 50 x 25 mmBuah27,600.00O. Flange Spigot CI For PVC319DN 250 mmBuah912,000.00320DN 200 mmBuah523,200.00321DN 150 mmBuah309,000.00322DN 100 mmBuah190,200.00323DN 75 mmBuah142,800.00324DN 50 mmBuah95,400.00P. Street Box (Valve Box)325DN. 350 mmBuah256,200.00326DN. 300 mmBuah187,800.00327DN. 250 mmBuah165,600.00328DN. 200 mmBuah116,400.00329DN. 150 mmBuah40,400.00330DN. 100 mmBuah60,600.00331DN. 75 mmBuah48,600.00332Lubricant/PelumasKali63,600.00R. All Flange Gate Valve PN 10333DN. 350 mmBuah24,540,000.00334DN. 300 mmBuah16,574,400.00335DN. 250 mmBuah14,095,200.00336DN. 200 mmBuah9,088,800.00337DN. 150 mmBuah4,722,400.00338DN. 100 mmBuah2,725,200.00339DN. 75 mmBuah2,071,800.00340DN. 50 mmBuah1,788,000.00S. Pengetesan Pipa341DN. 300 mmBuah4,600.00342DN. 250 mmBuah4,200.00343DN. 200 mmBuah3,720.00344DN. 150 mmBuah2,880.00345DN. 100 mmBuah2,760.00346DN. 75 mmBuah2,160.00347DN. 50 mmBuah1,800.00U. Lain-lain348Filter OliBuah45,300.00349Filter UdaraBuah81,700.00350Filter SolarBuah30,700.00351Rubbet Cople ST. 038Buah3,000.00352Rubbet Cople H. 110Buah63,500.00353Rubbet Cople BulatBuah11,800.00354Rubbet Cople H. 110Buah99,800.00355Kaporit Kadar 60%Kg36,300.001.5 mBAHAN TANAMAN0.5 m356Bogenvill Paragita 2 warnaPohonTN.10.00.2 m357Bogenvill 1 warnaPohonTN.20.0358Soka MiniPohonTN.30.00.5 m359Lantana Tegak/RebahPolybagTN.40.01.0 m360PuringPolybagTN.50.02.5 m361Bambu Gading KecilBatangTN.60.01.0 m362Bambu Gading TanggungBatangTN.70.02.5 m363Bambu Hijau KecilRumpunTN.80.0364Bambu Hijau TanggungRumpunTN.90.0365Biuti TaiwanSetTN.100.00.75 m366Pangkas KuningSetTN.110.01.0 m367Kool BandaSetTN.120.01.0 m368Cemara PecutBatangTN.130.0369Cemara NomflokBatangTN.140.01.0 m370Cemara KipasBatangTN.150.01.0 m2371Cemara UdangBatangTN.160.0372Rumput JepangRumpunTN.170.0373Kris DorenPotTN.180.0374Krokot PutihPolybagTN.190.0375Krokot warna, Aponika, Rikmo PutriPolybagTN.200.01.0 m376Palm BlarakRumpunTN.210.01.0 m377Palm BotolBatangTN.220.01.0 m378Palm RajaBatangTN.230.01.0 m379Palm Ekor TupaiBatangTN.240.0380Palm PutriBatangTN.250.01.0 m381Sikas HiasBatangTN.260.0382Glodogan PecutBatangTN.270.0383Tanah Ladu TanamBatangTN.280.01.0 m384Pupuk KandangZakTN.290.0385AngsanaBatangTN.300.0386Gebalan Rumputm2TN.3132,500.00PERALATAN TAMAN387Gunting Taman KecilBuah0.0388CetokBuah0.0389Sapu LidiBuah0.0390CikrakBuah0.0391Selang Hisap Diameter 2"m0.0392Selang Hisap Diameter 3"m0.09.0 m393Selang Buangm0.0394Sumur Tancap PVCm0.0P. PERLENGKAPAN PAKAIAN KERJA DINAS LAPANGAN395Pet/TopiBuah0.0396GesperBuah0.0397Sepatu LarasPasang0.0398Label NamaBuah0.0399AtributPasang0.0400Tanda PangkatPasang0.0401KoperingBuah0.0402Sepatu Semi ABRIPasang0.0403Simbol KORPRIBuah0.0BAHAN PENGUNCI404Union kecil 1 slagBuahPG.1117,700.00405Union kecil 2 slagBuahPG.2382,500.00406Yale 1 SlagBuahPG.360,460.00407Yale 2 SlagBuahPG.4107,000.00408Kuda terbang 1 slagBuahPG.569,550.00409Kuda terbang 2 slagBuahPG.685,400.00410RoyalStelPG.753,500.00411Haag angin besarPsPG.88,900.00412Haag angin kecilPsPG.97,060.00413Grendel besarBuahPG.1016,470.00414Grendel kecilBuahPG.119,630.00415Engsel NylonPsPG.1215,300.00416Engsel Kupu-kupuBuahPG.132,600.00417Engsel HPsPG.143,100.00418ExpagnoletBuahPG.1542,000.00SEWA ALAT1Sewa StamperOHSA.1250,000.002Sewa Hand stamperOHSA.2250,000.00

ANALISAANALISA HARGA SATUANIPEKERJAAN TANAHANL_A.11 m3Galian Tanah Biasa Sedalam < 1 MeterANL_A.165,312.50M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456ITenaga1Pekerja0.750OhU.475,00056,250.002Mandor0.025OhU.5125,0003,125.00Jumlah59,375.00Over Head 10%5,937.50Total65,312.50ANL_A.21 M3Galian Tanah Biasa Sedalam 2 MeterANL_A.280,437.50M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456ITenaga1Pekerja0.900OhU.475,00067,500.002Mandor0.045OhU.5125,0005,625.00Jumlah73,125.00Over Head 10%7,312.50Total80,437.50ANL_A.31 M3Galian Tanah Biasa Sedalam 3 MeterANL_A.395,837.50M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456ITenaga1Pekerja1.050OhU.475,00078,750.002Mandor0.067OhU.5125,0008,375.00Jumlah87,125.00Over Head 10%8,712.50Total95,837.50ANL_A.41 M3Galian Tanah Keras Sedalam 1 MeterANL_A.486,900.00M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456ITenaga1Pekerja1.000OhU.475,00075,000.002Mandor0.032OhU.5125,0004,000.00Jumlah79,000.00Over Head 10%7,900.00Total86,900.00ANL_A.51 M3Galian Tanah Cadas Sedalam 1 MeterANL_A.5132,000.00M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456ITenaga1Pekerja1.500OhU.475,000112,500.002Mandor0.060OhU.5125,0007,500.00Jumlah120,000.00Over Head 10%12,000.00Total132,000.00ANL_A.61 M3Galian Tanah Lumpur Sedalam 1 MeterANL_A.6105,187.50M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456ITenaga1Pekerja1.200OhU.475,00090,000.002Mandor0.045OhU.5125,0005,625.00Jumlah95,625.00Over Head 10%9,562.50Total105,187.50ANL_A.71 M2Mengerjakan Stripping Tebing Setinggai 1 MeterANL_A.74,812.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456ITenaga1Pekerja0.050OhU.475,0003,750.002Mandor0.005OhU.5125,000625.00Jumlah4,375.00Over Head 10%437.50Total4,812.50ANL_A.81 M3Membuang Tanah Sejauh 30MANL_A.828,600.00M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456ITenaga1Pekerja0.330OhU.475,00024,750.002Mandor0.010OhU.5125,0001,250.00Jumlah26,000.00Over Head 10%2,600.00Total28,600.00ANL_A.91 M3Urugan Tanah KembaliANL_A.921,770.83M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456ITenagaPekerja0.250OhU.475,00018,750.00Mandor0.008OhU.5125,0001,041.67Jumlah19,791.67Over Head 10%1,979.17Total21,770.83ANL_A.101 M3Urugan TanahANL_A.1090,062.50M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanTanah Urug1.200M3P.2350,00060,000.00125000100000IITenaga0.0Pekerja0.250OhU.475,00018,750.00Mandor0.025OhU.5125,0003,125.00Jumlah81,875.00Over Head 10%8,187.50Total90,062.50ANL_A.111 M3Urugan PasirANL_A.11183,205.00M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPasir Urug1.200M3P.22119,000142,800.00IITenaga0.0Pekerja0.300OhU.475,00022,500.00Mandor0.010OhU.5125,0001,250.00Jumlah166,550.00Over Head 10%16,655.00Total183,205.00ANL_A.121 M3Pemadatan Tanah Untuk BangunanANL_A.1225,093.75M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456ITenagaPekerja0.250OhU.475,00018,750.00Mandor0.013OhU.5125,0001,562.50IIPeralatan0.0Hand stamper0.010HariSA.1250,0002,500.00Jumlah22,812.50Over Head 10%2,281.25Total25,093.75IIPEKERJAAN PONDASIANL_B.11M3Pasang Pondasi Batu Kali, 1 Pc : 3 PsANL_B.1773,932.50M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBatu Belah 15/20 cm1.200M3P.2125,000150,000.00Semen Portland4.040ZakP.2965,000262,600.00Pasir Pasang0.485M3P.21160,00077,600.00IITenagaPekerja1.500OhU.475,000112,500.00Tukang Batu0.750OhU.6110,00082,500.00Kepala Tukang0.075OhU.7120,0009,000.00Mandor0.075OhU.5125,0009,375.000.00.00.00.0Jumlah703,575.00Over Head 10%70,357.50Total773,932.50ANL_B.21M3Pasang Pondasi Batu Kali, 1 Pc : 4 PsANL_B.2724,322.50M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBatu Belah 15/20 cm1.200M3P.2125,000150,000.00Semen Portland3.260ZakP.2965,000211,900.00Pasir Pasang0.520M3P.21160,00083,200.00IITenagaPekerja1.500OhU.475,000112,500.00Tukang Batu0.750OhU.6110,00082,500.00Kepala Tukang0.075OhU.7120,0009,000.00Mandor0.075OhU.5125,0009,375.000.00.00.00.0Jumlah658,475.00Over Head 10%65,847.50Total724,322.50ANL_B.31M3Pasang Pondasi Batu Belah, 1 Pc : 5 PsANL_B.3689,936.50M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBatu Belah 15/20 cm1.200M3P.2125,000150,000.00Semen Portland2.720ZakP.2965,000176,800.00Pasir Pasang0.544M3P.21160,00087,040.000.00.00.00.0IITenagaPekerja1.500OhU.475,000112,500.00Tukang Batu0.750OhU.6110,00082,500.00Kepala Tukang0.075OhU.7120,0009,000.00Mandor0.075OhU.5125,0009,375.000.00.00.00.0Jumlah627,215.00Over Head 10%62,721.50Total689,936.50ANL_B.41M3Pasang Pondasi Batu KosongANL_B.4343,599.30M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBatu Belah 15/20 cm1.200M3P.2125,000150,000.00Pasir Urug0.432ZakP.22119,00051,408.000.00.00.00.00.00.0IITenaga0.00.0Pekerja0.780OhU.475,00058,500.00Tukang Batu0.390OhU.6110,00042,900.00Kepala Tukang0.039OhU.7120,0004,680.00Mandor0.039OhU.5125,0004,875.000.00.00.00.0Jumlah312,363.00Over Head 10%31,236.30Total343,599.30ANL_B.51M3Pasang Pondasi SumuranANL_B.5824,037.50M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBatu Belah 15/20 cm0.450M3P.2125,00056,250.00Portland Cement3.880ZakP.2965,000252,200.00Pasir Beton0.312M3P.20175,00054,600.00Kerikil0.468M3P.6200,00093,600.000.00.0IITenaga0.00.0Pekerja2.400OhU.475,000180,000.00Tukang Batu0.800OhU.6110,00088,000.00Kepala Tukang0.080OhU.7120,0009,600.00Mandor0.119OhU.5125,00014,875.000.00.00.00.0Jumlah749,125.00Over Head 10%74,912.50Total824,037.50IIIPEKERJAAN DINDINGANL_C.11M2Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 Pc : 3 PsANL_C.1228,299.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBata merah140.000BuahP.2655077,000.00Semen Portland0.659ZakP.2965,00042,835.00Pasir Pasang0.091m3P.21160,00014,560.00IITenagaPekerja0.600OhU.475,00045,000.00Tukang Batu0.200OhU.6110,00022,000.00Kepala Tukang0.020OhU.7120,0002,400.00Mandor0.030OhU.5125,0003,750.00Jumlah207,545.00Over Head 10%20,754.50Total228,299.50ANL_C.21M2Memasang dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal 1 bata, campuran spesi 1 Pc : 4 PsANL_C.2219,499.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBata merah140.000BuahP.2655077,000.00Semen Portland0.531ZakP.2965,00034,515.00Pasir Pasang0.093m3P.21160,00014,880.00IITenaga0.0Pekerja0.600OhU.475,00045,000.00Tukang Batu0.200OhU.6110,00022,000.00Kepala Tukang0.020OhU.7120,0002,400.00Mandor0.030OhU.5125,0003,750.00Jumlah199,545.00Over Head 10%19,954.50Total219,499.50ANL_C.31M2Memasang dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal 1 bata, campuran spesi 1 Pc : 5 PsANL_C.3214,863.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBata merah140.000BuahP.2655077,000.00Semen Portland0.444ZakP.2965,00028,860.00Pasir Pasang0.102m3P.21160,00016,320.00IITenaga0.0Pekerja0.600OhU.475,00045,000.00Tukang Batu0.200OhU.6110,00022,000.00Kepala Tukang0.020OhU.7120,0002,400.00Mandor0.030OhU.5125,0003,750.00Jumlah195,330.00Over Head 10%19,533.00Total214,863.00ANL_C.41M2Memasang dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal 1/2 bata, campuran spesi 1 Pc : 2 PsANL_C.4116,369.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBata merah70.000BuahP.2655038,500.00Semen Portland0.379ZakP.2965,00024,635.00Pasir Pasang0.038m3P.21160,0006,080.00IITenaga0.0Pekerja0.300OhU.475,00022,500.00Tukang Batu0.100OhU.6110,00011,000.00Kepala Tukang0.010OhU.7120,0001,200.00Mandor0.015OhU.5125,0001,875.00Jumlah105,790.00Over Head 10%10,579.00Total116,369.00ANL_C.51M2Memasang dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal 1/2 bata, campuran spesi 1 Pc : 3 PsANL_C.5110,171.60M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBata merah70.000BuahP.2655038,500.00Semen Portland0.287ZakP.2965,00018,681.00Pasir Pasang0.040m3P.21160,0006,400.00IITenaga0.0Pekerja0.300OhU.475,00022,500.00Tukang Batu0.100OhU.6110,00011,000.00Kepala Tukang0.010OhU.7120,0001,200.00Mandor0.015OhU.5125,0001,875.00Jumlah100,156.00Over Head 10%10,015.60Total110,171.60ANL_C.61M2Memasang dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal 1/2 bata, campuran spesi 1Pc : 4 PsANL_C.6106,595.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBata merah70.000BuahP.2655038,500.00Semen Portland0.230ZakP.2965,00014,950.00Pasir Pasang0.043m3P.21160,0006,880.00IITenaga0.0Pekerja0.300OhU.475,00022,500.00Tukang Batu0.100OhU.6110,00011,000.00Kepala Tukang0.010OhU.7120,0001,200.00Mandor0.015OhU.5125,0001,875.00Jumlah96,905.00Over Head 10%9,690.50Total106,595.50ANL_C.71M2Memasang dinding bata merah ukuran ( 5 x 11 x 22 ) cm tebal 1/2 bata, campuran spesi 1Pc : 5 PsANL_C.7104,344.90M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBata merah70.000BuahP.2655038,500.00Semen Portland0.194ZakP.2965,00012,584.00Pasir Pasang0.045m3P.21160,0007,200.00IITenaga0.0Pekerja0.300OhU.475,00022,500.00Tukang Batu0.100OhU.6110,00011,000.00Kepala Tukang0.010OhU.7120,0001,200.00Mandor0.015OhU.5125,0001,875.00Jumlah94,859.00Over Head 10%9,485.90Total104,344.90ANL_C.81M2Memasang dinding dinding terawang ( roster ) ukuran ( 12 x 11 x 24 ) cm , campuran spesi 1Pc : 5 PsANL_C.8177,622.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanTerawang ( Roster )30.000BuahC.93,500105,000.00Semen Portland0.220ZakP.2965,00014,300.00Pasir Pasang0.035m3P.21160,0005,600.00IITenaga0.0Pekerja0.300OhU.475,00022,500.00Tukang Batu0.100OhU.6110,00011,000.00Kepala Tukang0.010OhU.7120,0001,200.00Mandor0.015OhU.5125,0001,875.00Jumlah161,475.00Over Head 10%16,147.50Total177,622.50ANL_C.91M2Memasang Bata Berongga Ekdpose ukuran ( 12 x 11 x 24 ) cm , campuran spesi 1Pc : 3 PsANL_C.9335,384.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanTerawang ( Roster )70.000BuahC.93,500245,000.00Semen Portland0.280ZakP.2965,00018,200.00Pasir Pasang0.032m3P.21160,0005,120.00IITenaga0.0Pekerja0.300OhU.475,00022,500.00Tukang Batu0.100OhU.6110,00011,000.00Kepala Tukang0.010OhU.7120,0001,200.00Mandor0.015OhU.5125,0001,875.00Jumlah304,895.00Over Head 10%30,489.50Total335,384.50IVPEKERJAAN BETONANL_D.11 KgPembesian dengan besi polos atau besi ulirANL_D.117,195.20KgNoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBesi Beton1.050kgBS.213,20013,860.00Kawat Beton0.015kgBS.923,000345.000.0IITenagaPekerja0.007OhU.475,000525.00Tukang Besi0.007OhU.10110,000770.00Kepala Tukang0.001OhU.11120,00084.00Mandor0.000OhU.11120,00048.00Jumlah15,632.00Over Head 10%1,563.20Total/1 Kg17,195.20ANL_D.21M2Memasang bekisting untuk pondasiANL_D.2234,880.80M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.040M3K.53,250,000130,000.00Paku 5 cm - 10 cm0.300kgPK.216,0004,800.00Minyak Bekisting0.100LiterFN.747,5804,758.00IITenaga0.00.0Pekerja0.520OhU.475,00039,000.00Tukang Kayu0.260OhU.8110,00028,600.00Kepala Tukang0.026OhU.9120,0003,120.00Mandor0.026OhU.5125,0003,250.00Jumlah213,528.00Over Head 10%21,352.80Total234,880.80ANL_D.31M2Memasang bekisting untuk SloofANL_D.3252,755.80M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.045M3K.53,250,000146,250.00Paku 5 cm - 10 cm0.300kgPK.216,0004,800.00Minyak Bekisting0.100LiterFN.747,5804,758.00IITenagaPekerja0.520OhU.475,00039,000.00Tukang Kayu0.260OhU.8110,00028,600.00Kepala Tukang0.026OhU.9120,0003,120.00Mandor0.026OhU.5125,0003,250.00Jumlah229,778.00Over Head 10%22,977.80Total252,755.80ANL_D.41M2Memasang bekisting untuk kolomANL_D.4453,613.60M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.040m3K.53,250,000130,000.00Paku 5 cm - 10 cm0.400kgPK.216,0006,400.00Minyak Bekisting0.200LiterFN.747,5809,516.00Balok Kayu Kelas II0.018m3K.44,250,00076,500.00Triplek 6 mm0.350LembarLG.494,50033,075.00Dolken Kayu Galam,2.000BatangK.931,50063,000.00dia. 8 - 10 cm, panjang 4 mIITenagaPekerja0.660OhU.475,00049,500.00Tukang Kayu0.330OhU.8110,00036,300.00Kepala Tukang0.033OhU.9120,0003,960.00Mandor0.033OhU.5125,0004,125.00Jumlah412,376.00Over Head 10%41,237.60Total453,613.60ANL_D.51M2Memasang bekisting untuk BalokANL_D.5453,613.60M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.040m3K.53,250,000130,000.00Paku 5 cm - 10 cm0.400kgPK.216,0006,400.00Minyak Bekisting0.200LiterFN.747,5809,516.00Balok Kayu Kelas II0.018m3K.44,250,00076,500.00Triplek 6 mm0.350LembarLG.494,50033,075.00Dolken Kayu Galam,2.000BatangK.931,50063,000.00dia. 8 - 10 cm, panjang 4 m0.00.0IITenagaPekerja0.660OhU.475,00049,500.00Tukang Kayu0.330OhU.8110,00036,300.00Kepala Tukang0.033OhU.9120,0003,960.00Mandor0.033OhU.5125,0004,125.00Jumlah412,376.00Over Head 10%41,237.60Total453,613.60ANL_D.61M2bekisting untuk LantaiANL_D.6164,176.10M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.0m3K.53,250,0000.0Paku 5 cm - 10 cm0.400kgPK.216,0006,400.00Minyak Bekisting0.200LiterFN.747,5809,516.00Balok Kayu Kelas II0.002m3K.44,250,0006,375.00Triplek 6 mm0.350LembarLG.494,50033,075.00Dolken Kayu Galam,BatangK.931,5000.0dia. 8 - 10 cm, panjang 4 m0.00.0IITenagaPekerja0.660OhU.475,00049,500.00Tukang Kayu0.330OhU.8110,00036,300.00Kepala Tukang0.033OhU.9120,0003,960.00Mandor0.033OhU.5125,0004,125.00Jumlah149,251.00Over Head 10%14,925.10Total164,176.10ANL_D.71M2Memasang bekisting untuk DindingANL_D.7600,463.60M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.030m3K.53,250,00097,500.00Paku 5 cm - 10 cm0.400kgPK.216,0006,400.00Minyak Bekisting0.200LiterFN.747,5809,516.00Balok Kayu Kelas II0.020m3K.44,250,00085,000.00Triplek 6 mm0.350LembarLG.494,50033,075.00Dolken Kayu Galam,7.000BatangK.931,500220,500.00dia. 8 - 10 cm, panjang 4 m0.00.0IITenagaPekerja0.660OhU.475,00049,500.00Tukang Kayu0.330OhU.8110,00036,300.00Kepala Tukang0.033OhU.9120,0003,960.00Mandor0.033OhU.5125,0004,125.00Jumlah545,876.00Over Head 10%54,587.60Total600,463.60ANL_D.81M2Memasang bekisting untuk TanggaANL_D.8401,221.70M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.030m3K.53,250,00097,500.00Paku 5 cm - 10 cm0.400kgPK.216,0006,400.00Minyak Bekisting0.150LiterFN.747,5807,137.00Balok Kayu Kelas II0.015m3K.44,250,00063,750.00Triplek 6 mm0.350LembarLG.494,50033,075.00Dolken Kayu Galam,2.000BatangK.931,50063,000.00dia. 8 - 10 cm, panjang 4 m0.00.0IITenagaPekerja0.660OhU.475,00049,500.00Tukang Kayu0.330OhU.8110,00036,300.00Kepala Tukang0.033OhU.9120,0003,960.00Mandor0.033OhU.5125,0004,125.00Jumlah364,747.00Over Head 10%36,474.70Total401,221.70ANL_D.91M3Membuat pondasi beton bertulang (150 kg besi + bekisting )ANL_D.94,673,751.50M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.200m3K.53,250,000650,000.00Paku 5 cm - 10 cm1.500kgPK.216,00024,000.00Besi Beton Polos157.500kgBS.213,2002,079,000.00Kawat Beton2.250kgBS.923,00051,750.00Semen Portland6.720ZakP.2965,000436,800.00Pasir Beton0.540m3P.20175,00094,500.00Kerikil0.810m3P.6200,000162,000.00IITenagaPekerja5.300OhU.475,000397,500.00Tukang Batu0.275OhU.6110,00030,250.00Tukang Kayu1.300OhU.8110,000143,000.00Tukang Besi1.050OhU.10110,000115,500.00Kepala Tukang Batu0.262OhU.7120,00031,440.00Mandor0.265OhU.5125,00033,125.00Jumlah4,248,865.00Over Head 10%424,886.50Total4,673,751.50ANL_D.101M3Membuat sloof beton bertulang (200 kg besi + bekisting)ANL_D.105,682,088.50M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.270m3K.53,250,000877,500.00Paku 5 cm - 10 cm2.000kgPK.216,00032,000.00Besi Beton Polos200.000kgBS.213,2002,640,000.00Kawat Beton3.000kgBS.923,00069,000.00Semen Portland6.720kgP.2965,000436,800.00Pasir Beton0.540m3P.20175,00094,500.00Kerikil0.810m3P.6200,000162,000.00IITenagaPekerja5.650OhU.475,000423,750.00Tukang Batu0.275OhU.6110,00030,250.00Tukang Kayu1.560OhU.8110,000171,600.00Tukang Besi1.400OhU.10110,000154,000.00Kepala Tukang0.323OhU.7120,00038,760.00Mandor0.283OhU.5125,00035,375.00Jumlah5,165,535.00Over Head 10%516,553.50Total5,682,088.50ANL_D.10a1M3Membuat sloof beton bertulang (150 kg besi + bekisting)ANL_D.10a4,956,088.50M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.270m3K.53,250,000877,500.00Paku 5 cm - 10 cm2.000kgPK.216,00032,000.00Besi Beton Polos150.000kgBS.213,2001,980,000.00Kawat Beton3.000kgBS.923,00069,000.00Semen Portland6.720kgP.2965,000436,800.00Pasir Beton0.540m3P.20175,00094,500.00Kerikil0.810m3P.6200,000162,000.00IITenagaPekerja5.650OhU.475,000423,750.00Tukang Batu0.275OhU.6110,00030,250.00Tukang Kayu1.560OhU.8110,000171,600.00Tukang Besi1.400OhU.10110,000154,000.00Kepala Tukang0.323OhU.7120,00038,760.00Mandor0.283OhU.5125,00035,375.00Jumlah4,505,535.00Over Head 10%450,553.50Total4,956,088.50ANL_D.111M3Membuat Kolom beton bertulang (150 kg besi + bekisting)ANL_D.116,811,513.50M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.400m3K.53,250,0001,300,000.00Paku 5 cm - 10 cm4.000kgPK.216,00064,000.00Besi Beton Polos150.000kgBS.213,2001,980,000.00Kawat Beton4.500kgBS.923,000103,500.00Semen Portland6.720kgP.2965,000436,800.00Pasir Beton0.540m3P.20175,00094,500.00Kerikil0.810m3P.6200,000162,000.00Balok Kayu Kelas II0.150m3K.44,250,000637,500.00Bambu20.000BatangB.217,500350,000.00IITenagaPekerja7.050OhU.475,000528,750.00Tukang Batu0.275OhU.6110,00030,250.00Tukang Kayu1.650OhU.8110,000181,500.00Tukang Besi2.100OhU.10110,000231,000.00Kepala Tukang0.403OhU.7120,00048,360.00Mandor0.353OhU.5125,00044,125.00Jumlah6,192,285.00Over Head 10%619,228.50Total6,811,513.50ANL_D.11a1M3Membuat Kolom beton bertulang (130 kg besi + bekisting)ANL_D.11a6,521,113.50M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.400m3K.53,250,0001,300,000.00Paku 5 cm - 10 cm4.000kgPK.216,00064,000.00Besi Beton Polos130.000kgBS.213,2001,716,000.00Kawat Beton4.500kgBS.923,000103,500.00Semen Portland6.720kgP.2965,000436,800.00Pasir Beton0.540m3P.20175,00094,500.00Kerikil0.810m3P.6200,000162,000.00Balok Kayu Kelas II0.150m3K.44,250,000637,500.00Bambu20.000BatangB.217,500350,000.00IITenagaPekerja7.050OhU.475,000528,750.00Tukang Batu0.275OhU.6110,00030,250.00Tukang Kayu1.650OhU.8110,000181,500.00Tukang Besi2.100OhU.10110,000231,000.00Kepala Tukang0.403OhU.7120,00048,360.00Mandor0.353OhU.5125,00044,125.00Jumlah5,928,285.00Over Head 10%592,828.50Total6,521,113.50ANL_D.121M3Membuat Balok beton bertulang (146 kg besi + bekisting)ANL_D.126,135,151.00M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.320m3K.53,250,0001,040,000.00Paku 5 cm - 10 cm3.200kgPK.216,00051,200.00Besi Beton Polos146.000kgBS.213,2001,927,200.00Kawat Beton3.000kgBS.923,00069,000.00Semen Portland6.720ZakP.2965,000436,800.00Pasir Beton0.540m3P.20175,00094,500.00Kerikil0.810m3P.6200,000162,000.00Balok Kayu Kelas II0.140m3K.44,250,000595,000.00Bambu16.000BatangB.217,500280,000.000.00.0IITenagaPekerja6.350OhU.475,000476,250.00Tukang Batu0.275OhU.6110,00030,250.00Tukang Kayu1.650OhU.8110,000181,500.00Tukang Besi1.400OhU.10110,000154,000.00Kepala Tukang0.333OhU.7120,00039,960.00Mandor0.318OhU.5125,00039,750.00Jumlah5,577,410.00Over Head 10%557,741.00Total6,135,151.00ANL_D.12a1M3Membuat Balok beton Tanpa TulanganANL_D.12a3,939,331.00M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.320m3K.53,250,0001,040,000.00Paku 5 cm - 10 cm3.200kgPK.216,00051,200.00Besi Beton Polos0.0kgBS.213,2000.0Kawat Beton0.0kgBS.923,0000.0Semen Portland6.720ZakP.2965,000436,800.00Pasir Beton0.540m3P.20175,00094,500.00Kerikil0.810m3P.6200,000162,000.00Balok Kayu Kelas II0.140m3K.44,250,000595,000.00Bambu16.000BatangB.217,500280,000.000.00.0IITenagaPekerja6.350OhU.475,000476,250.00Tukang Batu0.275OhU.6110,00030,250.00Tukang Kayu1.650OhU.8110,000181,500.00Tukang Besi1.400OhU.10110,000154,000.00Kepala Tukang0.333OhU.7120,00039,960.00Mandor0.318OhU.5125,00039,750.00Jumlah3,581,210.00Over Head 10%358,121.00Total3,939,331.00ANL_D.131M3Membuat Dinding beton bertulang ( 150 kg besi + bekisting )ANL_D.136,801,072.30M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.240m3K.53,250,000780,000.00Paku 5 cm - 10 cm3.200kgPK.216,00051,200.00Minyak Bekisting1.600LiterFN.747,58076,128.00Besi Beton Polos157.500kgBS.213,2002,079,000.00Kawat Beton2.250kgBS.923,00051,750.00Semen Portland6.720ZakP.2965,000436,800.00Pasir Beton0.540m3P.20175,00094,500.00Kerikil0.810m3P.6200,000162,000.00Balok Kayu Kelas II0.160m3K.44,250,000680,000.00Triplek 6 mm2.800LembarLG.494,500264,600.00Dolken Kayu Galam,24.000BatangK.931,500756,000.00dia. 8 - 10 cm, panjang 4 mIITenagaPekerja5.300OhU.475,000397,500.00Tukang Batu0.275OhU.6110,00030,250.00Tukang Kayu1.300OhU.8110,000143,000.00Tukang Besi1.050OhU.10110,000115,500.00Kepala Tukang0.262OhU.7120,00031,440.00Mandor0.265OhU.5125,00033,125.00Jumlah6,182,793.00Over Head 10%618,279.30Total6,801,072.30ANL_D.141M'Membuat Kolom Praktis beton bertulangANL_D.14103,926.00M'NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.002m3K.53,250,0006,500.00Paku 5 cm - 10 cm0.010kgPK.216,000160.00Minyak Bekisting0.0LiterFN.747,5800.0Besi Beton Polos3.000kgBS.213,20039,600.00Kawat Beton0.450kgBS.923,00010,350.00Semen Portland0.080ZakP.2965,0005,200.00Pasir Beton0.006m3P.20175,0001,050.00Kerikil0.009m3P.6200,0001,800.00IITenagaPekerja0.180OhU.475,00013,500.00Tukang Batu0.020OhU.6110,0002,200.00Tukang Kayu0.020OhU.8110,0002,200.00Tukang Besi0.020OhU.10110,0002,200.00Kepala Tukang0.006OhU.7120,000720.00Mandor0.009OhU.5125,0001,125.00Jumlah86,605.00Over Head 10%8,660.50Total95,265.50Total103,926.00ANL_D.151M'Membuat Ring Balk beton bertulangANL_D.15117,375.50M'NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.003m3K.53,250,0009,750.00Paku 5 cm - 10 cm0.020kgPK.216,000320.00Minyak Bekisting0.0LiterFN.747,5800.0Besi Beton Polos3.600kgBS.213,20047,520.00Kawat Beton0.050kgBS.923,0001,150.00Semen Portland0.110kgP.2965,0007,150.00Pasir Beton0.009m3P.20175,0001,575.00Kerikil0.015m3P.6200,0003,000.00IITenagaPekerja0.297OhU.475,00022,275.00Tukang Batu0.033OhU.6110,0003,630.00Tukang Kayu0.033OhU.8110,0003,630.00Tukang Besi0.033OhU.10110,0003,630.00Kepala Tukang0.010OhU.7120,0001,200.00Mandor0.015OhU.5125,0001,875.00Jumlah106,705.00Over Head 10%10,670.50Total117,375.50ANL_D.16M2Membuat Lantai Kerja Beton Tumbuk 1Pc : 3 Ps : 5 Kr (tebal 5 Cm)ANL_D.16122,969.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanSemen Portland0.200zakP.2965,00013,000.00Pasir Beton0.026M3P.20175,0004,550.00Koral Beton0.024M3P.6200,0004,800.00IITenaga0.00.0Pekerja1.150OhU.475,00086,250.00Tukang Batu0.020OhU.6110,0002,200.00Kepala Tukang0.002OhU.7120,000240.00Mandor0.006OhU.5125,000750.00Jumlah111,790.00Over Head 10%11,179.00Total122,969.00ANL_D.16aM2Membuat Lantai Kerja Beton Tumbuk 1Pc : 3 Ps : 5 Kr (tebal 10 Cm)ANL_D.16a243,639.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanSemen Portland0.400zakP.2965,00026,000.00Pasir Beton0.052M3P.20175,0009,100.00Koral Beton0.048M3P.6200,0009,600.00IITenaga0.00.0Pekerja2.300OhU.475,000172,500.00Tukang Batu0.030OhU.6110,0003,300.00Kepala Tukang0.002OhU.7120,000240.00Mandor0.006OhU.5125,000750.00Jumlah221,490.00Over Head 10%22,149.00Total243,639.00ANL_D.17M3Membuat Beton Bertulang 1Pc : 2Ps : 3 KrANL_D.17784,135.00M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanSemen Portland4.640ZakP.2965,000301,600.00Pasir Beton0.520M3P.20175,00091,000.00Koral Beton0.780M3P.6200,000156,000.00IITenaga0.00.0Pekerja1.650OhU.475,000123,750.00Tukang Batu0.250OhU.6110,00027,500.00Kepala Tukang0.025OhU.7120,0003,000.00Mandor0.080OhU.5125,00010,000.00Jumlah712,850.00Over Head 10%71,285.00Total784,135.00ANL_D.18M3Membuat Beton Dengan Mutu fc' = 17.5 MpaANL_D.181,493,415.00M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanSemen Portland7.760ZakP.2965,000504,400.00Pasir Beton0.650M3P.20175,000113,750.00Koral Beton0.650M3P.6200,000130,000.00IITenagaPekerja6.000OhU.475,000450,000.00Tukang Batu1.000OhU.6110,000110,000.00Kepala Tukang0.100OhU.7120,00012,000.00Mandor0.300OhU.5125,00037,500.00Jumlah1,357,650.00Over Head 10%135,765.00Total1,493,415.00ANL_D.19M3Membuat Plat Beton Bertulang ( 150 kg Besi + Bekisting)ANL_D.196,916,572.30M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.240m3K.53,250,000780,000.00Paku 5 cm - 10 cm3.200kgPK.216,00051,200.00Minyak Bekisting1.600LiterFN.747,58076,128.00Besi Beton Polos150.000kgBS.213,2001,980,000.00Kawat Beton2.250kgBS.923,00051,750.00Semen Portland6.720ZakP.2965,000436,800.00Pasir Beton0.540m3P.20175,00094,500.00Kerikil0.810m3P.6200,000162,000.00Balok Kayu Kelas II0.208m3K.44,250,000884,000.00Triplek 6 mm2.800LembarLG.494,500264,600.00Dolken Kayu Galam,24.000BatangK.931,500756,000.00dia. 8 - 10 cm, panjang 4 m0.00.00.00.0IITenagaPekerja5.300OhU.475,000397,500.00Tukang Batu0.275OhU.6110,00030,250.00Tukang Kayu1.300OhU.8110,000143,000.00Tukang Besi1.050OhU.10110,000115,500.00Kepala Tukang0.262OhU.7120,00031,440.00Mandor0.265OhU.5125,00033,125.00Jumlah6,287,793.00Over Head 10%628,779.30Total6,916,572.30ANL_D.20M3Membuat Rabbat Beton (Camp. 1Pc : 3 Psr : 5 Kr)ANL_D.20783,915.00M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanSemen Portland4.360ZakP.2965,000283,400.00Pasir Beton0.520m3P.20175,00091,000.00Kerikil0.870m3P.6200,000174,000.000.00.00.00.0IITenagaPekerja1.650OhU.475,000123,750.00Tukang Batu0.250OhU.6110,00027,500.00Kepala Tukang0.025OhU.7120,0003,000.00Mandor0.080OhU.5125,00010,000.00Jumlah712,650.00Over Head 10%71,265.00Total783,915.00ANL_D.211M3Membuat Kolom beton bertulang (151 kg besi + bekisting)ANL_D.216,826,033.50M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.400m3K.53,250,0001,300,000.00Paku 5 cm - 10 cm4.000kgPK.216,00064,000.00Besi Beton Polos151.000kgBS.213,2001,993,200.00Kawat Beton4.500kgBS.923,000103,500.00Semen Portland6.720kgP.2965,000436,800.00Pasir Beton0.540m3P.20175,00094,500.00Kerikil0.810m3P.6200,000162,000.00Balok Kayu Kelas II0.150m3K.44,250,000637,500.00Bambu20.000BatangB.217,500350,000.00IITenagaPekerja7.050OhU.475,000528,750.00Tukang Batu0.275OhU.6110,00030,250.00Tukang Kayu1.650OhU.8110,000181,500.00Tukang Besi2.100OhU.10110,000231,000.00Kepala Tukang0.403OhU.7120,00048,360.00Mandor0.353OhU.5125,00044,125.00Jumlah6,205,485.00Over Head 10%620,548.50Total6,826,033.50ANL_D.221M3Membuat Kolom beton bertulang (153 kg besi + bekisting)ANL_D.226,855,073.50M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.400m3K.53,250,0001,300,000.00Paku 5 cm - 10 cm4.000kgPK.216,00064,000.00Besi Beton Polos153.000kgBS.213,2002,019,600.00Kawat Beton4.500kgBS.923,000103,500.00Semen Portland6.720kgP.2965,000436,800.00Pasir Beton0.540m3P.20175,00094,500.00Kerikil0.810m3P.6200,000162,000.00Balok Kayu Kelas II0.150m3K.44,250,000637,500.00Bambu20.000BatangB.217,500350,000.00IITenagaPekerja7.050OhU.475,000528,750.00Tukang Batu0.275OhU.6110,00030,250.00Tukang Kayu1.650OhU.8110,000181,500.00Tukang Besi2.100OhU.10110,000231,000.00Kepala Tukang0.403OhU.7120,00048,360.00Mandor0.353OhU.5125,00044,125.00Jumlah6,231,885.00Over Head 10%623,188.50Total6,855,073.50ANL_D.231M3Membuat Kolom beton bertulang (173 kg besi + bekisting)ANL_D.237,145,473.50M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.400m3K.53,250,0001,300,000.00Paku 5 cm - 10 cm4.000kgPK.216,00064,000.00Besi Beton Polos173.000kgBS.213,2002,283,600.00Kawat Beton4.500kgBS.923,000103,500.00Semen Portland6.720kgP.2965,000436,800.00Pasir Beton0.540m3P.20175,00094,500.00Kerikil0.810m3P.6200,000162,000.00Balok Kayu Kelas II0.150m3K.44,250,000637,500.00Bambu20.000BatangB.217,500350,000.00IITenagaPekerja7.050OhU.475,000528,750.00Tukang Batu0.275OhU.6110,00030,250.00Tukang Kayu1.650OhU.8110,000181,500.00Tukang Besi2.100OhU.10110,000231,000.00Kepala Tukang0.403OhU.7120,00048,360.00Mandor0.353OhU.5125,00044,125.00Jumlah6,495,885.00Over Head 10%649,588.50Total7,145,473.50ANL_D.241M3Membuat Balok beton bertulang (120 kg besi + bekisting)ANL_D.245,757,631.00M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Kelas III0.320m3K.53,250,0001,040,000.00Paku 5 cm - 10 cm3.200kgPK.216,00051,200.00Besi Beton Polos120.000kgBS.213,2001,584,000.00Kawat Beton3.000kgBS.923,00069,000.00Semen Portland6.720ZakP.2965,000436,800.00Pasir Beton0.540m3P.20175,00094,500.00Kerikil0.810m3P.6200,000162,000.00Balok Kayu Kelas II0.140m3K.44,250,000595,000.00Bambu16.000BatangB.217,500280,000.000.00.0IITenagaPekerja6.350OhU.475,000476,250.00Tukang Batu0.275OhU.6110,00030,250.00Tukang Kayu1.650OhU.8110,000181,500.00Tukang Besi1.400OhU.10110,000154,000.00Kepala Tukang0.333OhU.7120,00039,960.00Mandor0.318OhU.5125,00039,750.00Jumlah5,234,210.00Over Head 10%523,421.00Total5,757,631.00VPEKERJAAN KAYUANL_E.11 m2Membuat dan memasang daun pintu panel kayu Klas IANL_E.11,069,475.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPapan Kayu Klas I0.04m3K.112,500,000500,000.00Lem Kayu0.50KgLG.1150,00025,000.00IITenagaPekerja1.000OhU.475,00075,000.00Tukang Kayu3.000OhU.8110,000330,000.00Kepala Tukang0.300OhU.9120,00036,000.00Mandor0.050OhU.5125,0006,250.00Jumlah972,250.00Over Head 10%97,225.00Total1,069,475.00ANL_E.21 m2Membuat dan memasang daun pintu panel kayu Klas IIANL_E.2746,075.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPapan Kayu Klas II0.04m3K.35,150,000206,000.00Lem Kayu0.50KgLG.1150,00025,000.00IITenagaPekerja1.000OhU.475,00075,000.00Tukang Kayu3.000OhU.8110,000330,000.00Kepala Tukang0.300OhU.9120,00036,000.00Mandor0.050OhU.5125,0006,250.00Jumlah678,250.00Over Head 10%67,825.00Total746,075.00ANL_E.31 m2Membuat dan memasang daun pintu dan jendela kaca, kayu Klas IANL_E.3740,080.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPapan Kayu Klas I0.02m3K.112,500,000300,000.00Lem Kayu0.30KgLG.1150,00015,000.00IITenaga0.0Pekerja0.800OhU.475,00060,000.00Tukang Kayu2.400OhU.8110,000264,000.00Kepala Tukang0.240OhU.9120,00028,800.00Mandor0.040OhU.5125,0005,000.00Jumlah672,800.00Over Head 10%67,280.00Total740,080.00ANL_E.41 m2Membuat dan memasang daun pintu dan jendela kaca, kayu Klas IIANL_E.4546,040.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPapan Kayu Klas II0.02m3K.35,150,000123,600.00Lem Kayu0.30KgLG.1150,00015,000.00IITenaga0.0Pekerja0.800OhU.475,00060,000.00Tukang Kayu2.400OhU.8110,000264,000.00Kepala Tukang0.240OhU.9120,00028,800.00Mandor0.040OhU.5125,0005,000.00Jumlah496,400.00Over Head 10%49,640.00Total546,040.00ANL_E.51 m2Membuat dan memasang daun pintu dan jendela jalusi, kayu Klas IANL_E.51,399,475.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPapan Kayu Klas I0.064m3K.112,500,000800,000.00Lem Kayu0.500KgLG.1150,00025,000.00IITenaga0.0Pekerja1.000OhU.475,00075,000.00Tukang Kayu3.000OhU.8110,000330,000.00Kepala Tukang0.300OhU.9120,00036,000.00Mandor0.050OhU.5125,0006,250.00Jumlah1,272,250.00Over Head 10%127,225.00Total1,399,475.00ANL_E.61 m2Membuat dan memasang daun pintu dan jendela jalusi, kayu Klas IIANL_E.6882,035.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPapan Kayu Klas II0.064m3K.35,150,000329,600.00Lem Kayu0.500KgLG.1150,00025,000.00IITenaga0.0Pekerja1.000OhU.475,00075,000.00Tukang Kayu3.000OhU.8110,000330,000.00Kepala Tukang0.300OhU.9120,00036,000.00Mandor0.050OhU.5125,0006,250.00Jumlah801,850.00Over Head 10%80,185.00Total882,035.00ANL_E.71 m2Membuat daun pintu kayu lapis (Plywood) rangkap , rangka tertutup kayu Klas II ( lebar sampai 90 cm )ANL_E.7604,671.10M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPapan Kayu Klas II0.025m3K.35,150,000128,750.00Paku 1 cm - 2,5 cm0.030KgPK.121,700651.00Lem Kayu0.500KgLG.1150,00025,000.00plywood tebal 4 mm1.000LembarLG.7a37,50037,500.00ukuran ( 90 x 220 ) cm0.00.0IITenaga0.0Pekerja0.800OhU.475,00060,000.00Tukang Kayu2.400OhU.8110,000264,000.00Kepala Tukang0.240OhU.9120,00028,800.00Mandor0.040OhU.5125,0005,000.00Jumlah549,701.00Over Head 10%54,970.10Total604,671.10ANL_E.81 m2Membuat pintu kayu lapis (Plywood) rangkap , rangka expose kayu Klas IANL_E.8815,046.10M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPapan Kayu Klas I0.0256m3K.112,500,000320,000.00Paku 1 cm - 2,5 cm0.0300KgPK.121,700651.00Lem Kayu0.5000KgLG.1150,00025,000.00plywood tebal 4 mm1.0000LembarLG.7a37,50037,500.00ukuran ( 90 x 220 ) cmIITenaga0.0Pekerja0.8000OhU.475,00060,000.00Tukang Kayu2.4000OhU.8110,000264,000.00Kepala Tukang0.2400OhU.9120,00028,800.00Mandor0.0400OhU.5125,0005,000.00Jumlah740,951.00Over Head 10%74,095.10Total815,046.10ANL_E.91 m2Membuat pintu kayu lapis (Plywood) rangkap , rangka expose kayu Klas IIANL_E.9608,070.10M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPapan Kayu Klas II0.0256m3K.35,150,000131,840.00Paku 1 cm - 2,5 cm0.0300KgPK.121,700651.00Lem Kayu0.5000KgLG.1150,00025,000.00plywood tebal 4 mm1.0000LembarLG.7a37,50037,500.00ukuran ( 90 x 220 ) cmIITenaga0.0Pekerja0.8000OhU.475,00060,000.00Tukang Kayu2.4000OhU.8110,000264,000.00Kepala Tukang0.2400OhU.9120,00028,800.00Mandor0.0400OhU.5125,0005,000.00Jumlah552,791.00Over Head 10%55,279.10Total608,070.10ANL_E.101 m3Membuat dan memasang Kusen Pintu & Jendela Kayu Klas IANL_E.1015,053,500.00M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBalok Kayu Klas I1.050m3K.210,000,00010,500,000.00Paku 7 cm - 12 cm2.500KgPK.121,70054,250.00IITenaga0.0Pekerja7.000OHU.475,000525,000.00Tukang Kayu21.000OHU.8110,0002,310,000.00Kepala Tukang2.100OHU.9120,000252,000.00Mandor0.350OHU.5125,00043,750.00Jumlah13,685,000.00Over Head 10%1,368,500.00Total15,053,500.00ANL_E.111 m2Memasang pintu jalusi kusen,kayu Klas IIANL_E.11713,218.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPapan Kayu Klas II0.060m3K.35,150,000309,000.00Paku 1 cm - 2,5 cm0.150KgPK.121,7003,255.00IITenaga0.0Pekerja0.670OhU.475,00050,250.00Tukang Kayu2.000OhU.8110,000220,000.00Kepala Tukang0.200OhU.9120,00024,000.00Mandor0.335OhU.5125,00041,875.00Jumlah648,380.00Over Head 10%64,838.00Total713,218.00ANL_E.121 m2Memasang teakwood rangkap, rangka expose kayu Klas IANL_E.12795,796.10M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPapan Kayu Klas I0.0250m3K.112,500,000312,500.00Paku 1 cm - 2,5 cm0.0300KgPK.121,700651.00Lem Kayu0.3000KgLG.1150,00015,000.00plywood tebal 4 mm1.0000LembarLG.7a37,50037,500.00ukuran ( 90 x 220 ) cm0.00.0IITenaga0.00.0Pekerja0.8000OhU.475,00060,000.00Tukang Kayu2.4000OhU.8110,000264,000.00Kepala Tukang0.2400OhU.9120,00028,800.00Mandor0.0400OhU.5125,0005,000.00Jumlah723,451.00Over Head 10%72,345.10Total795,796.10ANL_E.131 m2Memasang teakwood rangkap lapis formika, rangka expose kayu Klas IIANL_E.13733,129.10M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPapan Kayu Klas II0.0250m3K.35,150,000128,750.00Paku 1 cm - 2,5 cm0.0300KgPK.121,700651.00Lem Kayu0.8000KgLG.1150,00040,000.00plywood tebal 4 mm1.0000LembarLG.7a37,50037,500.00ukuran ( 90 x 220 ) cm0.00.0Formika0.5000LembarLG.9158,71079,355.00IITenaga0.0Pekerja0.8500OhU.475,00063,750.00Tukang Kayu2.5500OhU.8110,000280,500.00Kepala Tukang0.2550OhU.9120,00030,600.00Mandor0.0430OhU.5125,0005,375.00Jumlah666,481.00Over Head 10%66,648.10Total733,129.10ANL_E.141 m3Memasang konstruksi kuda-kuda kayu Klas IANL_E.1417,462,060.00M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBalok Kayu Klas I1.1000m3K.112,500,00013,750,000.00Besi Strip tebal 5 mm15.0000KgBS.1916,400246,000.00Paku 12 cm5.6000KgPK.316,00089,600.00IITenaga0.00.0Pekerja4.0000OhU.475,000300,000.00Tukang Kayu12.0000OhU.8110,0001,320,000.00Kepala Tukang1.2000OhU.9120,000144,000.00Mandor0.2000OhU.5125,00025,000.00Jumlah15,874,600.00Over Head 10%1,587,460.00Total17,462,060.00ANL_E.151 m3Memasang konstruksi kuda-kuda kayu Klas IIANL_E.157,479,560.00M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBalok Kayu Klas II1.1000m3K.44,250,0004,675,000.00Besi Strip tebal 5 mm15.0000KgBS.1916,400246,000.00Paku 12 cm5.6000KgPK.316,00089,600.00IITenaga0.00.0Pekerja4.0000OhU.475,000300,000.00Tukang Kayu12.0000OhU.8110,0001,320,000.00Kepala Tukang1.2000OhU.9120,000144,000.00Mandor0.2000OhU.5125,00025,000.00Jumlah6,799,600.00Over Head 10%679,960.00Total7,479,560.00ANL_E.15a1 m3Memasang Gording kayu Klas IIANL_E.15a7,163,200.00M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBalok Kayu Klas II1.1000m3K.44,250,0004,675,000.00Besi Strip tebal 5 mm0.0KgBS.1916,4000.0Paku 12 cm3.0000KgPK.316,00048,000.00IITenaga0.00.0Pekerja4.0000OhU.475,000300,000.00Tukang Kayu12.0000OhU.8110,0001,320,000.00Kepala Tukang1.2000OhU.9120,000144,000.00Mandor0.2000OhU.5125,00025,000.00Jumlah6,512,000.00Over Head 10%651,200.00Total7,163,200.00ANL_E.161 m3Memasang konstruksi kuda-kuda expose, kayu Klas IANL_E.1616,867,455.00M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBalok Kayu Klas I1.2000m3K.210,000,00012,000,000.00Besi Strip tebal 5 mm15.0000KgBS.1916,400246,000.00Paku 12 cm5.6000KgPK.316,00089,600.00IITenaga0.00.0Pekerja6.7000OhU.475,000502,500.00Tukang Kayu20.1000OhU.8110,0002,211,000.00Kepala Tukang2.0100OhU.9120,000241,200.00Mandor0.3500OhU.5125,00043,750.00Jumlah15,334,050.00Over Head 10%1,533,405.00Total16,867,455.00ANL_E.16a1 m3Memasang Konsol Kayu Klas IIANL_E.16a7,621,900.00M3NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBalok Kayu Klas I1.2000m3K.44,250,0005,100,000.00Besi Strip tebal 5 mm0.0KgBS.1916,4000.0Paku 12 cm2.5000KgPK.316,00040,000.00IITenaga0.00.0Pekerja4.0000OhU.475,000300,000.00Tukang Kayu12.0000OhU.8110,0001,320,000.00Kepala Tukang1.2000OhU.9120,000144,000.00Mandor0.2000OhU.5125,00025,000.00Jumlah6,929,000.00Over Head 10%692,900.00Total7,621,900.00ANL_E.171 m2Memasang rangka atap genteng keramik, kayu Klas IIANL_E.17260,507.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKaso - Kaso ( 5 x 7 ) cm Kayu Klas II0.0140m3K.44,250,00059,500.00Reng ( 2 x 3 ) cm Kayu Klas II0.0360m3K.44,250,000153,000.00Paku 5 cm dan 10 cm0.2500KgPK.216,0004,000.00IITenaga0.00.0Pekerja0.1000OhU.475,0007,500.00Tukang Kayu0.1000OhU.8110,00011,000.00Kepala Tukang0.0100OhU.9120,0001,200.00Mandor0.0050OhU.5125,000625.00Jumlah236,825.00Over Head 10%23,682.50Total260,507.50ANL_E.17a1 m2Memasang rangka atap genteng Pejaten, kayu Klas IIANL_E.17a82,857.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBalok Kayu Klas II0.0120m3K.44,250,00051,000.00Paku 5 cm dan 10 cm0.2500KgPK.216,0004,000.00IITenaga0.00.0Pekerja0.1000OhU.475,0007,500.00Tukang Kayu0.1000OhU.8110,00011,000.00Kepala Tukang0.0100OhU.9120,0001,200.00Mandor0.0050OhU.5125,000625.00Jumlah75,325.00Over Head 10%7,532.50Total82,857.50ANL_E.17c1 m2Memasang rangka atap genteng Pejaten, kayu Klas II (30% Kayu Baru)ANL_E.17c24,857.25M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBalok Kayu Klas II0.0036m3K.44,250,00015,300.00Paku 5 cm dan 10 cm0.0750KgPK.216,0001,200.00IITenaga0.00.0Pekerja0.0300OhU.475,0002,250.00Tukang Kayu0.0300OhU.8110,0003,300.00Kepala Tukang0.0030OhU.9120,000360.00Mandor0.0015OhU.5125,000187.50Jumlah22,597.50Over Head 10%2,259.75Total24,857.25ANL_E.17b1 m2Memasang rangka atap genteng Kodok, kayu Klas IIANL_E.17b82,857.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBalok Kayu Klas II0.0120m3K.44,250,00051,000.00Paku 5 cm dan 10 cm0.2500KgPK.216,0004,000.00IITenaga0.00.0Pekerja0.1000OhU.475,0007,500.00Tukang Kayu0.1000OhU.8110,00011,000.00Kepala Tukang0.0100OhU.9120,0001,200.00Mandor0.0050OhU.5125,000625.00Jumlah75,325.00Over Head 10%7,532.50Total82,857.50ANL_E.17d1 m2Memasang rangka atap genteng Kodok, kayu Klas II (30% Kayu Baru)ANL_E.17d24,857.25M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBalok Kayu Klas II0.0036m3K.44,250,00015,300.00Paku 5 cm dan 10 cm0.0750KgPK.216,0001,200.00IITenaga0.00.0Pekerja0.0300OhU.475,0002,250.00Tukang Kayu0.0300OhU.8110,0003,300.00Kepala Tukang0.0030OhU.9120,000360.00Mandor0.0015OhU.5125,000187.50Jumlah22,597.50Over Head 10%2,259.75Total24,857.25ANL_E.181 m2Memasang rangka atap genteng beton, kayu Klas IIANL_E.1892,207.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBalok Kayu Klas II0.0140m3K.44,250,00059,500.00Paku 5 cm dan 10 cm0.2500KgPK.216,0004,000.00IITenaga0.00.0Pekerja0.1000OhU.475,0007,500.00Tukang Kayu0.1000OhU.8110,00011,000.00Kepala Tukang0.0100OhU.9120,0001,200.00Mandor0.0050OhU.5125,000625.00Jumlah83,825.00Over Head 10%8,382.50Total92,207.50ANL_E.18a1 m2Memasang rangka atap genteng Multi Roof, kayu Klas IIANL_E.18a90,447.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBalok Kayu Klas II0.0140m3K.44,250,00059,500.000.0140.009Paku0.1500KgPK.216,0002,400.000.3913043478IITenaga0.00.0Pekerja0.1000OhU.475,0007,500.00Tukang Kayu0.1000OhU.8110,00011,000.00Kepala Tukang0.0100OhU.9120,0001,200.00Mandor0.0050OhU.5125,000625.00Jumlah82,225.00Over Head 10%8,222.50Total90,447.50ANL_E.18b1 m2Memasang rangka atap genteng Multi Roof, kayu Klas II (30% Usuk Baru)ANL_E.18b54,268.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )0.0140.00840.00421234560.002520.0042IBahan0.00672Balok Kayu Klas II0.0084m3K.44,250,00035,700.000.60.6Paku0.0900KgPK.216,0001,440.00IITenaga0.00.0Pekerja0.0600OhU.475,0004,500.00Tukang Kayu0.0600OhU.8110,0006,600.00Kepala Tukang0.0060OhU.9120,000720.00Mandor0.0030OhU.5125,000375.00Jumlah49,335.00Over Head 10%4,933.50Total54,268.50ANL_E.18c1 m2Memasang rangka atap genteng Multi Roof, kayu Klas II (Usuk Lama)ANL_E.18c28,634.10M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )0.0140.00840.00421234560.002520.0042IBahan0.00672Balok Kayu Klas II0.0042m3K.44,250,00017,850.000.50.5Paku0.0540KgPK.216,000864.00IITenaga0.00.0Pekerja0.0360OhU.475,0002,700.00Tukang Kayu0.0360OhU.8110,0003,960.00Kepala Tukang0.0036OhU.9120,000432.00Mandor0.0018OhU.5125,000225.00Jumlah26,031.00Over Head 10%2,603.10Total28,634.10ANL_E.191 m2Memasang rangka atap sirap, kayu Klas IIANL_E.19801,724.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Klas II0.1650m3K.44,250,000701,250.00Paku 5 cm dan 10 cm0.2000KgPK.216,0003,200.00IITenaga0.00.0Pekerja0.1200OhU.475,0009,000.00Tukang Kayu0.1200OhU.8110,00013,200.00Kepala Tukang0.0120OhU.9120,0001,440.00Mandor0.0060OhU.5125,000750.00Jumlah728,840.00Over Head 10%72,884.00Total801,724.00ANL_E.201 m2Memasang rangka langit - langit (50 x 50) cm, kayu Klas IIANL_E.20138,462.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKaso - Kaso ( 5 x 7 ) cm Kayu Klas II0.0154m3K.44,250,00065,450.00Paku 7 cm dan 10 cm0.2000KgPK.216,0003,200.00IITenaga0.00.0Pekerja0.1500OhU.475,00011,250.00Tukang Kayu0.3000OhU.8110,00033,000.00Kepala Tukang0.0300OhU.9120,0003,600.00Mandor0.0750OhU.5125,0009,375.00Jumlah125,875.00Over Head 10%12,587.50Total138,462.50ANL_E.211 m2Memasang rangka langit - langit (60 x 60) cm, kayu Klas IIANL_E.21106,067.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKaso - Kaso ( 5 x 7 ) cm Kayu Klas II0.0163m3K.44,250,00069,275.00Paku 7 cm dan 10 cm0.2500KgPK.216,0004,000.00IITenaga0.00.0Pekerja0.2000OhU.475,00015,000.00Tukang Kayu0.0300OhU.8110,0003,300.00Kepala Tukang0.0300OhU.9120,0003,600.00Mandor0.0100OhU.5125,0001,250.00Jumlah96,425.00Over Head 10%9,642.50Total106,067.50ANL_E.221 m1Memasang lisplank ukuran (3 x 20) cm, kayu Klas IANL_E.22186,037.50M'NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPapan kayu Klas I0.0108m3K.112,500,000135,000.00Paku 5 cm dan 7 cm0.1000KgPK.216,0001,600.00IITenaga0.00.0Pekerja0.1000OhU.475,0007,500.00Tukang Kayu0.2000OhU.8110,00022,000.00Kepala Tukang0.0200OhU.9120,0002,400.00Mandor0.0050OhU.5125,000625.00Jumlah169,125.00Over Head 10%16,912.50Total186,037.50ANL_E.231 m1Memasang lisplank ukuran (3 x 20) cm, kayu Klas IIANL_E.2398,719.50M'NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPapan kayu Klas II0.0108m3K.35,150,00055,620.00Paku 5 cm dan 7 cm0.1000KgPK.216,0001,600.00IITenaga0.00.0Pekerja0.1000OhU.475,0007,500.00Tukang Kayu0.2000OhU.8110,00022,000.00Kepala Tukang0.0200OhU.9120,0002,400.00Mandor0.0050OhU.5125,000625.00Jumlah89,745.00Over Head 10%8,974.50Total98,719.50ANL_E.23a1 m1Memasang lisplank ukuran (3 x 20) cm, kayu Klas II (60% Papan Lama)ANL_E.23a77,305.80M'NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPapan kayu Klas II0.0070m3K.35,150,00036,153.00Paku 5 cm dan 7 cm0.1000KgPK.216,0001,600.00IITenaga0.00.0Pekerja0.1000OhU.475,0007,500.00Tukang Kayu0.2000OhU.8110,00022,000.00Kepala Tukang0.0200OhU.9120,0002,400.00Mandor0.0050OhU.5125,000625.00Jumlah70,278.00Over Head 10%7,027.80Total77,305.80ANL_E.241 m1Memasang lisplank ukuran (3 x 30) cm, kayu Klas IANL_E.24187,907.50M'NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPapan kayu Klas I0.0110m3K.112,500,000137,500.00Paku 5 cm dan 7 cm0.0500KgPK.216,000800.00IITenaga0.00.0Pekerja0.1000OhU.475,0007,500.00Tukang Kayu0.2000OhU.8110,00022,000.00Kepala Tukang0.0200OhU.9120,0002,400.00Mandor0.0050OhU.5125,000625.00Jumlah170,825.00Over Head 10%17,082.50Total187,907.50ANL_E.251 m1Memasang lisplank ukuran (3 x 30) cm, kayu Klas IIANL_E.2598,972.50M'NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPapan kayu Klas II0.0110m3K.35,150,00056,650.00Paku 5 cm dan 7 cm0.0500KgPK.216,000800.00IITenaga0.00.0Pekerja0.1000OhU.475,0007,500.00Tukang Kayu0.2000OhU.8110,00022,000.00Kepala Tukang0.0200OhU.9120,0002,400.00Mandor0.0050OhU.5125,000625.00Jumlah89,975.00Over Head 10%8,997.50Total98,972.50ANL_E.261 m2Memasang rangka dinding pemisah (60 x 120) cm, kayu Klas IIANL_E.26207,405.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBalok Kayu Klas II0.0280m3K.44,250,000119,000.00Paku 5 cm dan 7 cm0.1500KgPK.216,0002,400.00IITenaga0.00.0Pekerja0.1500OhU.475,00011,250.00Tukang Kayu0.4500OhU.8110,00049,500.00Kepala Tukang0.0450OhU.9120,0005,400.00Mandor0.0080OhU.5125,0001,000.00Jumlah188,550.00Over Head 10%18,855.00Total207,405.00ANL_E.271 m2Memasang dinding pemisah teakwood rangkap, rangka kayu klas IIANL_E.27207,405.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBalok Kayu Klas II0.0280m3K.44,250,000119,000.00Paku 5 cm dan 7 cm0.1500KgPK.216,0002,400.00IITenaga0.00.0Pekerja0.1500OhU.475,00011,250.00Tukang Kayu0.4500OhU.8110,00049,500.00Kepala Tukang0.0450OhU.9120,0005,400.00Mandor0.0080OhU.5125,0001,000.00Jumlah188,550.00Over Head 10%18,855.00Total207,405.00ANL_E.281 m2Memasang dinding pemisah Triplek 3mm rangkap, rangka kayu klas IIANL_E.28280,218.89M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBalok Kayu, ukuran (6 x 12) cm KayuKlas II0.0280m3K.44,250,000119,000.00paku 5 cm dan 10 cm0.1500KgPK.216,0002,400.00Triplek 3mm0.6944LembarLG.355,00038,194.44Ukuran 120 cm x 240 cm0.00.0Lem Kayu0.5600KgLG.1150,00028,000.00IITenaga0.0Pekerja0.1500OhU.475,00011,250.00Tukang Kayu0.4500OhU.8110,00049,500.00Kepala Tukang0.0450OhU.9120,0005,400.00Mandor0.0080OhU.5125,0001,000.00Jumlah254,744.44Over Head 10%25,474.44Total280,218.89ANL_E.291 m2Memasang dinding pemisah Plywood rangkap, rangka kayu klas IIANL_E.29340,780.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanBalok Kayu, ukuran (6 x 12) cm KayuKlas II0.0280m3K.44,250,000119,000.00paku 5 cm dan 10 cm0.1500KgPK.216,0002,400.00Plywood Tebal 4 mm,0.8600LembarLG.7b82,50070,950.00Ukuran 120 cm x 240 cm0.00.0Lem Kayu0.5600KgLG.1150,00028,000.00IITenaga0.0Pekerja0.2000OhU.475,00015,000.00Tukang Kayu0.6000OhU.8110,00066,000.00Kepala Tukang0.0600OhU.9120,0007,200.00Mandor0.0100OhU.5125,0001,250.00Jumlah309,800.00Over Head 10%30,980.00Total340,780.00ANL_E.301 m2Pek. Baja Ringan (Bersertifikat & Bergaransi Min. 10Th)ANL_E.30182,649.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanMobilisasi1.0000LS-7,5007,500.00Main truss C-75-752.8000mA.10.110,71430,000.00Roof Bottom/Reng R 33-0.455.1000mA.10.28,50043,350.00Self drilling screw dia 6 x 20 mm (truss Screw)25.0000BhA.10.33759,375.00Self drilling screw dia 4 x 16 mm (Roof Bottom Screw)35.0000BhA.10.435012,250.00Dynabol dia 12 x 120 mm1.0000BhA.10.51,5001,500.00IITenaga0.0Tukang0.2470OhU.8110,00027,170.00Tukang Besi Profil0.1760OhU.8110,00019,360.00Kepala Tukang Besi Profil0.1170OhU.11120,00014,040.00Alat Bantu (Mesin Bor Listrik)/Genset1.0000Oh-1,5001,500.00Jumlah166,045.00Over Head 10%16,604.50Total182,649.50VIPEKERJAAN PLESTERANANL_F.11M2Plesteran 1Pc : 2 Ps, tebal 15 mmANL_F.165,082.82M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanSemen Portland0.204ZakP.2965,00013,291.20Pasir Pasang0.020M3P.21160,0003,200.00IITenagaPekerja0.300OhU.475,00022,500.00Tukang Batu0.150OhU.6110,00016,500.00Kepala Tukang Batu0.015OhU.7120,0001,800.00Mandor0.015OhU.5125,0001,875.00Jumlah59,166.20Over Head 10%5,916.62Total65,082.82ANL_F.21M2Plesteran 1Pc : 3 Ps, tebal 15 mmANL_F.262,110.18M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanSemen Portland0.156ZakP.2965,00010,108.80Pasir Pasang0.023M3P.21160,0003,680.00IITenaga0.0Pekerja0.300OhU.475,00022,500.00Tukang Batu0.150OhU.6110,00016,500.00Kepala Tukang Batu0.015OhU.7120,0001,800.00Mandor0.015OhU.5125,0001,875.00Jumlah56,463.80Over Head 10%5,646.38Total62,110.18ANL_F.31M2Plesteran 1Pc : 4 Ps, tebal 15 mmANL_F.360,089.70M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanSemen Portland0.125ZakP.2965,0008,112.00Pasir Pasang0.024M3P.21160,0003,840.00IITenaga0.0Pekerja0.300OhU.475,00022,500.00Tukang Batu0.150OhU.6110,00016,500.00Kepala Tukang Batu0.015OhU.7120,0001,800.00Mandor0.015OhU.5125,0001,875.00Jumlah54,627.00Over Head 10%5,462.70Total60,089.70ANL_F.41M2Plesteran 1Pc : 5 Ps, tebal 15 mmANL_F.458,931.62M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanSemen Portland0.104ZakP.2965,0006,739.20Pasir Pasang0.026M3P.21160,0004,160.00IITenagaPekerja0.300OhU.475,00022,500.00Tukang Batu0.150OhU.6110,00016,500.00Kepala Tukang Batu0.015OhU.7120,0001,800.00Mandor0.015OhU.5125,0001,875.00Jumlah53,574.20Over Head 10%5,357.42Total58,931.62ANL_F.51M2Plesteran 1Pc : 2 Ps, tebal 20 mmANL_F.587,110.76M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanSemen Portland0.273ZakP.2965,00017,721.60Pasir Pasang0.027M3P.21160,0004,320.00IITenaga0.0Pekerja0.400OhU.475,00030,000.00Tukang Batu0.200OhU.6110,00022,000.00Kepala Tukang Batu0.020OhU.7120,0002,400.00Mandor0.022OhU.5125,0002,750.00Jumlah79,191.60Over Head 10%7,919.16Total87,110.76ANL_F.61M2Plesteran 1Pc : 3 Ps, tebal 20 mmANL_F.670,359.74M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanSemen Portland0.207ZakP.2965,00013,478.40Pasir Pasang0.031M3P.21160,0004,960.00IITenaga0.0Pekerja0.260OhU.475,00019,500.00Tukang Batu0.200OhU.6110,00022,000.00Kepala Tukang Batu0.020OhU.7120,0002,400.00Mandor0.013OhU.5125,0001,625.00Jumlah63,963.40Over Head 10%6,396.34Total70,359.74ANL_F.71M2Plesteran 1Pc : 4 Ps, tebal 20 mmANL_F.780,394.60M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanSemen Portland0.166ZakP.2965,00010,816.00Pasir Pasang0.032M3P.21160,0005,120.00IITenaga0.0Pekerja0.400OhU.475,00030,000.00Tukang Batu0.200OhU.6110,00022,000.00Kepala Tukang Batu0.020OhU.7120,0002,400.00Mandor0.022OhU.5125,0002,750.00Jumlah73,086.00Over Head 10%7,308.60Total80,394.60ANL_F.81M2Plesteran 1Pc : 5 Ps, tebal 20 mmANL_F.883,199.16M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanSemen Portland0.198ZakP.2965,00012,885.60Pasir Pasang0.035M3P.21160,0005,600.00IITenaga0.0Pekerja0.400OhU.475,00030,000.00Tukang Batu0.200OhU.6110,00022,000.00Kepala Tukang Batu0.020OhU.7120,0002,400.00Mandor0.022OhU.5125,0002,750.00Jumlah75,635.60Over Head 10%7,563.56Total83,199.16ANL_F.91M2Plesteran Siar 1 Pc : 2 PsANL_F.958,120.70M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanSemen Portland0.127ZakP.2965,0008,242.00Pasir Pasang0.012M3P.21160,0001,920.00IITenaga0.0Pekerja0.300OhU.475,00022,500.00Tukang Batu0.150OhU.6110,00016,500.00Kepala Tukang Batu0.015OhU.7120,0001,800.00Mandor0.015OhU.5125,0001,875.00Jumlah52,837.00Over Head 10%5,283.70Total58,120.70ANL_F.101M21M2 AcianANL_F.1035,942.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanSemen Portland0.065ZakP.2965,0004,225.00Pasir Pasang0.000M3P.21160,0000.0IITenagaPekerja0.200OhU.475,00015,000.00Tukang Batu0.100OhU.6110,00011,000.00Kepala Tukang Batu0.010OhU.7120,0001,200.00Mandor0.010OhU.5125,0001,250.00Jumlah32,675.00Over Head 10%3,267.50Total35,942.50ANL_F.111M2Plesteran Ciprat 1 Pc : 2 PsANL_F.1147,466.10M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanSemen Portland0.086ZakP.2965,0005,616.00Pasir Pasang0.006M3P.21160,000960.00IITenagaPekerja0.300OhU.475,00022,500.00Tukang Batu0.100OhU.6110,00011,000.00Kepala Tukang Batu0.010OhU.7120,0001,200.00Mandor0.015OhU.5125,0001,875.00Jumlah43,151.00Over Head 10%4,315.10Total47,466.10VIIPEKERJAAN PLAFONDANL_G.11M2Langit - langit Asbes, tebal 5 mmANL_G.169,256.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPlat Asbes tebal 5 mm1.100LbrA.14a46,70051,370.00Paku0.010KgPK.530,000300.00IITenagaPekerja0.030OhU.475,0002,250.00Tukang Kayu0.070OhU.8110,0007,700.00Kepala Tukang0.007OhU.9120,000840.00Mandor0.004OhU.5125,000500.00Jumlah62,960.00Over Head 10%6,296.00Total69,256.00ANL_G.21M2Langit - langit Plywood ( 60 X 120 ) cm, tebal 3 mmANL_G.236,135.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPlywood 120 X 240 X 3 mm0.375LbrLG.7a37,50014,062.50Paku0.030KgPK.530,000900.00IITenagaPekerja0.070OhU.475,0005,250.00Tukang Kayu0.100OhU.8110,00011,000.00Kepala Tukang Kayu0.010OhU.9120,0001,200.00Mandor0.0035OhU.5125,000437.50Jumlah32,850.00Over Head 10%3,285.00Total36,135.00ANL_G.31M2Langit - langit Asbes ( 1.00 X 1.00 ) m, Tebal 3.2 mm, rangka kayu kls IIANL_G.3173,618.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanKayu Balok klas II0.012M3K.44,250,00051,000.00Paku Biasa0.060KgPK.530,0001,800.00Plat Asbes 1.00 X 1.00 m1.100LbrA.14a46,70051,370.00IITenaga0.0Pekerja0.180OhU.475,00013,500.00Tukang Kayu0.320OhU.8110,00035,200.00Kepala Tukang0.032OhU.9120,0003,840.00Mandor0.009OhU.5125,0001,125.00Jumlah157,835.00Over Head 10%15,783.50Total173,618.50ANL_G.41M2Langit - langit Eternit (1,00 x 1,00) m + rangka kayu Kelas IIANL_G.4143,126.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahan1Kayu Balok klas II0.012M3K.44,250,00051,000.002Paku Biasa0.060KgPK.530,0001,800.003Eternit 1.00 X 1.00 m1.100LbrLG.121,50023,650.00IITenaga0.01Pekerja0.180OhU.475,00013,500.002Tukang Kayu0.320OhU.8110,00035,200.003Kepala Tukang0.032OhU.9120,0003,840.004Mandor0.009OhU.5125,0001,125.00Jumlah130,115.00Over Head 10%13,011.50Total143,126.50ANL_G.51M2Langit - langit Calcyboard Board, tebal 3.5 mmANL_G.5155,888.70M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanCalcyboard 120 x 240 x 3,5 mm0.364LbrLG.6a70,00025,480.00Paku Sekrup0.110KgPK.69,2001,012.00Rangka Hollow 2x4 t=0.35mm1.025Btg60,00061,500.00Stifener3.000Bh6,50019,500.00Penggantung & Ramzet4.000Bh5,00020,000.00IITenagaPekerja0.100OhU.475,0007,500.00Tukang Kayu0.050OhU.8110,0005,500.00Kepala Tukang0.005OhU.9120,000600.00Mandor0.005OhU.5125,000625.00Jumlah141,717.00Over Head 10%14,171.70Total155,888.70ANL_G.5a1M1List Plafond GybsumANL_G.5a39,567.00M1NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanList Gypsum 7/7 cm1.000m-15,00015,000.00Tepung Gypsum0.650Kg-13,5008,775.00IITenagaPekerja0.060OhU.475,0004,500.00Tukang Kayu0.060OhU.8110,0006,600.00Kepala Tukang0.006OhU.9120,000720.00Mandor0.003OhU.5125,000375.00Jumlah35,970.00Over Head 10%3,597.00Total39,567.00ANL_G.61M2Pasang Plafon Triplek 3 mm + Rangka Kayu Klas IIANL_G.6175,642.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBAHAN1Kayu kelas II0.008M3K.44,250,00034,000.002Paku0.030KgPK.530,000900.003Triplek 120 x 240 cm x 3 mm0.375LembarLG.355,00020,625.00IIUPAH1Tukang kayu0.800HariU.475,00060,000.002Kepala tukang kayu0.080HariU.8110,0008,800.003Pekerja0.280HariU.9120,00033,600.004Mandor0.014HariU.5125,0001,750.00Jumlah159,675.00Over Head 10%15,967.50Total175,642.50ANL_G.6b1M2Pasang Plafon Triplek 3 mm + Rangka Kayu Klas II (35% Rangka Baru)ANL_G.6b110,591.25M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBAHAN1Kayu kelas II0.003M3K.44,250,00011,900.002Paku0.011KgPK.530,000315.003Triplek 120 x 240 cm x 3 mm0.375LembarLG.355,00020,625.00IIUPAH1Tukang kayu0.520HariU.475,00039,000.002Kepala tukang kayu0.052HariU.8110,0005,720.003Pekerja0.182HariU.9120,00021,840.004Mandor0.009HariU.5125,0001,137.50Jumlah100,537.50Over Head 10%10,053.75Total110,591.25ANL_G.6c1M2Pasang Plafon Triplek 3 mm + Rangka Kayu Klas II (50% Rangka Baru)ANL_G.6c156,942.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBAHAN1Kayu kelas II0.004M3K.44,250,00017,000.002Paku0.030KgPK.530,000900.003Triplek 120 x 240 cm x 3 mm0.375LembarLG.355,00020,625.00IIUPAH1Tukang kayu0.800HariU.475,00060,000.002Kepala tukang kayu0.080HariU.8110,0008,800.003Pekerja0.280HariU.9120,00033,600.004Mandor0.014HariU.5125,0001,750.00Jumlah142,675.00Over Head 10%14,267.50Total156,942.50ANL_G.6.a1M2Pasang Plafon Triplek 3 mm di atas UsukANL_G.6.a91,921.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBAHAN1Kayu kelas II0.0M3K.44,250,0000.02Paku0.015KgPK.530,000450.003Triplek 120 x 240 cm x 3 mm0.375LembarLG.355,00020,625.00IIUPAH1Tukang kayu0.480HariU.475,00036,000.002Kepala tukang kayu0.048HariU.8110,0005,280.003Pekerja0.168HariU.9120,00020,160.004Mandor0.008HariU.5125,0001,050.00Jumlah83,565.00Over Head 10%8,356.50Total91,921.50ANL_G.71M1Pasang List Plafond Kayu diprofilANL_G.728,091.25M1NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBAHAN1List Kayu1.050M'FN.2510,00010,500.002Paku Panjang 1 - 3 cm0.250KgPK.121,7005,425.000.00.0IIUPAH1Tukang kayu0.075HariU.475,0005,625.002Kepala tukang kayu0.008HariU.8110,000825.003Pekerja0.025HariU.9120,0003,000.004Mandor0.001HariU.5125,000162.50Jumlah25,537.50Over Head 10%2,553.75Total28,091.25VIIIPEKERJAAN LANTAIANL_H.11M2Pasang Lantai Batu Bata 1 LapisANL_H.153,460.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456ITenaga1Tukang batu0.060HariU.475,0004,500.002Pekerja0.200HariU.6110,00022,000.00IIBahan1Batu bata30.000BuahP.26550.0016,500.002Pasir pasangan0.035M3P.21160,000.005,600.00Jumlah48,600.00Over Head 10%4,860.00Total53,460.00ANL_H.21M2Pasang Lantai FloorANL_H.270,840.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456ITenaga1Pekerja0.1200HariU.475,0009,000.002Mandor Pekerja0.0060HariU.5125,000750.003Tukang Batu0.1200HariU.6110,00013,200.004Kepala Tukang Batu0.0120HariU.7120,0001,440.00IIBahan1Semen Warna1.5000KgP.2812,00018,000.002PC. Merk Tiga Roda (50 Kg)0.1860ZakP.2965,00012,090.003Pasir pasang0.0620M3P.21160,0009,920.00Jumlah64,400.00Over Head 10%6,440.00Total70,840.00ANL_H.31M2Pasang Lantai Keramik 20 X 20 cmANL_H.3251,883.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahan1Keramik Lantai 20 X 20 cm1.050M2LT.885,00089,250.002Semen Portland0.208ZakP.2965,00013,520.003Pasir Pasang0.045M3P.21160,0007,200.004semen warna1.620KgP.2812,00019,440.00IITenaga1Pekerja0.700OhU.475,00052,500.002Tukang Batu0.350OhU.6110,00038,500.003Kepala Tukang0.035OhU.7120,0004,200.004Mandor0.035OhU.5125,0004,375.00Jumlah228,985.00Over Head 10%22,898.50Total251,883.50ANL_H.41M2Pasang Lantai Keramik 30 X 30 cmANL_H.4249,727.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahan1Lantai Keramik Kw. I1.050M2LT.885,000.0089,250.002Semen Portland0.200ZakP.2965,000.0013,000.003Pasir Pasang0.045M3P.21160,000.007,200.004Semen warna1.500KgP.2812,000.0018,000.00IITenaga1Pekerja0.700OhU.475,00052,500.002Tukang Batu0.350OhU.6110,00038,500.003Kepala Tukang0.035OhU.7120,0004,200.004Mandor0.035OhU.5125,0004,375.00Jumlah227,025.00Over Head 10%22,702.50Total249,727.50ANL_H.51M2Pasang Lantai Keramik 40 X 40 cmANL_H.5232,402.50M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahan1Lantai Keramik 40x40 Cm1.050M2LT.870,000.0073,500.002Semen Portland0.200ZakP.2965,000.0013,000.003Pasir Pasang0.045M3P.21160,000.007,200.004Semen warna1.500KgP.2812,000.0018,000.000.00.0IITenaga1Pekerja0.700OhU.475,00052,500.002Tukang Batu0.350OhU.6110,00038,500.003Kepala Tukang0.035OhU.7120,0004,200.004Mandor0.035OhU.5125,0004,375.00Jumlah211,275.00Over Head 10%21,127.50Total232,402.50ANL_H.61M2Pasang Keramik Dinding 20 X 20 cmANL_H.6278,190.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahan1Keramik Dinding 20 x 20 Cm, Motif ( Kw. 1 )1.050M2LT.782,500.0086,625.002Semen Portland0.186ZakP.2965,000.0012,090.003Pasir Pasang0.018M3P.21160,000.002,880.004Semen warna1.940KgP.2812,000.0023,280.000.00.0IITenaga1Pekerja0.900OhU.475,00067,500.002Tukang Batu0.450OhU.6110,00049,500.003Kepala Tukang0.045OhU.7120,0005,400.004Mandor0.045OhU.5125,0005,625.00Jumlah252,900.00Over Head 10%25,290.00Total278,190.00ANL_H.71M2Pasang Lantai Ubin Abu-abu ( 20 x 20 Cm )ANL_H.7115,115.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahan1Tegel Abu-abu 20 x 20 Cm1.000M2LT.145,400.0045,400.002Semen Portland0.208ZakP.2965,000.0013,520.003Pasir Pasang0.045M3P.21160,000.007,200.000.00.0IITenaga1Pekerja0.270OhU.475,00020,250.002Tukang Batu0.135OhU.6110,00014,850.003Kepala Tukang0.014OhU.7120,0001,680.004Mandor0.014OhU.5125,0001,750.00Jumlah104,650.00Over Head 10%10,465.00Total115,115.00ANL_H.81M2Pasang Paving Blok Type Tiga BerlianANL_H.8194,183.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanPaving Blok Type Tiga Berlian25.000BhLT.162,800.0070,000.00Pasir Pasang0.018M3P.21160,000.002,880.00IITenaga0.00.0Pekerja0.600OhU.475,00045,000.00Tukang Batu0.450OhU.6110,00049,500.00Kepala Tukang0.045OhU.7120,0005,400.00Mandor0.030OhU.5125,0003,750.00Jumlah176,530.00Over Head 10%17,653.00Total194,183.00IXPEKERJAAN ATAPANL_I.11 m2Atap Genteng PejatenANL_I.1106,106.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanGenteng Pejaten25.000BuahA.83,00075,000.000.00.00.00.00.00.00.00.0IITenagaPekerja0.150OHU.475,00011,250.00Mandor Pekerja0.008OHU.5125,0001,000.00Tukang Kayu0.075OHU.8110,0008,250.00Kepala Tukang Kayu0.008OHU.9120,000960.00Jumlah96,460.00Over Head 10%9,646.00Total106,106.00ANL_I.21 m'Bubungan Atap Genteng PejatenANL_I.298,637.00M'NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanGenteng Bubungan Pejaten5.000BuahA.93,90019,500.00PC. Merk Tiga Roda (50 Kg)0.160ZakP.2965,00010,400.00Pasir pasang0.032m3P.21160,0005,120.000.00.00.00.0IITenagaPekerja0.400OHU.475,00030,000.00Mandor Pekerja0.002OHU.5125,000250.00Tukang Kayu0.200OHU.8110,00022,000.00Kepala Tukang Kayu0.020OHU.9120,0002,400.00Jumlah89,670.00Over Head 10%8,967.00Total98,637.00ANL_I.31 m2Atap Genteng Kodok/SilangANL_I.3119,856.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanGenteng Kodok/Silang25.000BuahA.63,50087,500.000.00.00.00.00.00.00.00.0IITenagaPekerja0.150OHU.475,00011,250.00Mandor Pekerja0.008OHU.5125,0001,000.00Tukang Kayu0.075OHU.8110,0008,250.00Kepala Tukang Kayu0.008OHU.9120,000960.00Jumlah108,960.00Over Head 10%10,896.00Total119,856.00ANL_I.3a1 m2Atap Genteng Kodok/Silang (Genteng Lama)ANL_I.3a23,606.00M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanGenteng Kodok/Silang0.0BuahA.63,5000.00.00.00.00.00.00.00.00.0IITenagaPekerja0.150OHU.475,00011,250.00Mandor Pekerja0.008OHU.5125,0001,000.00Tukang Kayu0.075OHU.8110,0008,250.00Kepala Tukang Kayu0.008OHU.9120,000960.00Jumlah21,460.00Over Head 10%2,146.00Total23,606.00ANL_I.41 m'Bubungan Atap Genteng Kodok/SilangANL_I.460,409.25M'NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanGenteng Bubungan Kodok5.000BuahA.73,60018,000.00Semen Portland0.160ZakP.2965,00010,400.00Pasir Pasang0.032BuahP.21160,0005,120.000.00.00.00.0IITenagaPekerja0.150OHU.475,00011,250.00Mandor Pekerja0.008OHU.5125,000937.50Tukang Kayu0.075OHU.8110,0008,250.00Kepala Tukang Kayu0.008OHU.9120,000960.00Jumlah54,917.50Over Head 10%5,491.75Total60,409.25ANL_I.4a1 m'Bubungan Atap Genteng Kodok/SilangANL_I.4a60,409.25M'NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanGenteng Bubungan Kodok5.000BuahA.73,60018,000.00Semen Portland0.160ZakP.2965,00010,400.00Pasir Pasang0.032BuahP.21160,0005,120.000.00.00.00.0IITenagaPekerja0.150OHU.475,00011,250.00Mandor Pekerja0.008OHU.5125,000937.50Tukang Kayu0.075OHU.8110,0008,250.00Kepala Tukang Kayu0.008OHU.9120,000960.00Jumlah54,917.50Over Head 10%5,491.75Total60,409.25ANL_I.51 m2Atap Seng Gelombang Besar BJLS 30ANL_I.569,874.20M2NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanSeng Gelombang Besar BJLS 300.700LembarA.2065,50045,850.00Paku Seng0.020KgPK.430,100602.000.00.00.00.00.00.0IITenagaPekerja0.120OHU.475,0009,000.00Mandor Pekerja0.006OHU.5125,000750.00Tukang Kayu0.060OHU.8110,0006,600.00Kepala Tukang Kayu0.006OHU.9120,000720.00Jumlah63,522.00Over Head 10%6,352.20Total69,874.20ANL_I.61 m'Bubungan Atap Seng Gelombang Besar BJLS 30ANL_I.645,929.40M'NoUraianKuantitasSatuanKodeHarga SatuanJumlah HargaPekerjaan (Rp)( Rp )123456IBahanSeng Plat BJLS 300.300LembarA.2465,50019,650.00Paku Seng0.040KgPK.430,1001,204.000.00.00.00.00.00.0IITenagaPekerja0.150OHU.475,00