1 Production Planning / Production Planning / Agregat Planning Agregat Planning M A C H F U D

Upload: fachru-reza-rochili

Post on 28-Dec-2015

124 views

Category:

Documents


17 download

DESCRIPTION

pp

TRANSCRIPT

Page 1: Production Planning

1

Production Planning / Production Planning /

Agregat PlanningAgregat Planning

M A C H F U D

Page 2: Production Planning

2

Production Planning: Units of MeasureProduction Planning: Units of MeasureProduction Planning: Units of MeasureProduction Planning: Units of Measure

Master Production SchedulingMaster Production Scheduling

Production Planning and Control SystemsProduction Planning and Control Systems

Pond DrainingPond DrainingSystemsSystems

Aggregate PlanningAggregate Planning

PushPushSystems Systems

PullPullSystemsSystems

Focusing onFocusing onBottlenecksBottlenecks

Long-Range Capacity PlanningLong-Range Capacity PlanningEntire Entire

Product LineProduct Line

ProductProductFamilyFamily

SpecificSpecificProduct ModelProduct Model

Labor, Materials,Labor, Materials,MachinesMachines

Page 3: Production Planning

3

Capacity Planning, Aggregate Planning, Master Schedule, and Short-Term Capacity Planning, Aggregate Planning, Master Schedule, and Short-Term SchedulingScheduling

Capacity Planning1. Facility Size2. Equipment Procurement

Aggregate Planning1. Facility Utilization2. Personnel needs3. Subcontracting

Master Schedule1. MRP2. Disaggregation of master plan

Short-term Scheduling1. Work center loading2. Job sequencing

Long-term

Intermediate-term

Intermediate-term

Short-term

Page 4: Production Planning

4

Hierarchical Production PlanningHierarchical Production Planning

Annual demand byitem and by region

Monthly demandfor 15 months by

product type

Monthly demandfor 5 months by

item

Forecasts needed

Allocatesproduction

among plants

Determinesseasonal plan by

product type

Determines monthlyitem production

schedules

Decision ProcessDecision Level

Corporate

Plant manager

Shopsuperintendent

Page 5: Production Planning

5

Relationships Between OM ElementsRelationships Between OM Elements

Marketplaceand Demand

Research and Technology

Product Decisions

Process Planning & Decisions

Aggregate Plan for Production

Detailed Work Schedules

Master Production Schedule

PriorityPlanning &Scheduling

Demand Forecasts, orders

External Capacity

Plant Capacity

Raw Materials Available

Inventory On Hand

Work Force

Page 6: Production Planning

6

Aggregate PlanningAggregate Planning

Page 7: Production Planning

7

Mengapa Perencanaan Agregat PerluMengapa Perencanaan Agregat PerluMengapa Perencanaan Agregat PerluMengapa Perencanaan Agregat Perlu

Pembebanan fasilitas secara penuh dan Pembebanan fasilitas secara penuh dan meminimumkan meminimumkan overloadingoverloading dan dan underloadingunderloading

Menjamin tersedianya kapasitas yang cukup untuk Menjamin tersedianya kapasitas yang cukup untuk memenuhi memenuhi expected demandexpected demand

Merencanakan perubahan tingkat produksi secara Merencanakan perubahan tingkat produksi secara teratur dan sistematik untuk memenuhi fluktuasi teratur dan sistematik untuk memenuhi fluktuasi permintaan (permintaan (the peaks and valleys of expected the peaks and valleys of expected customer demand)customer demand)

Memperoleh output terbesar dengan sumberdaya Memperoleh output terbesar dengan sumberdaya produksi yang tersedia / terbatas. produksi yang tersedia / terbatas.

Page 8: Production Planning

8

InputsInputsInputsInputs

Hasil prakiraan permintaan secara agregat dalam Hasil prakiraan permintaan secara agregat dalam horizon perencanaan tertentu (6-18 bulan)horizon perencanaan tertentu (6-18 bulan)

Alternatif kebijakan untuk penyesuaian kapasitas Alternatif kebijakan untuk penyesuaian kapasitas jangka pendek ke kapasitas jangka menengah, dan jangka pendek ke kapasitas jangka menengah, dan dampak setiap alternatif terhadap kapasitas dan biayadampak setiap alternatif terhadap kapasitas dan biaya

Status sistem produksi saat ini, yaitu jumlah tenaga Status sistem produksi saat ini, yaitu jumlah tenaga kerja, tingkat persediaan, dan tingkat produksi. kerja, tingkat persediaan, dan tingkat produksi.

Page 9: Production Planning

9

OutputsOutputsOutputsOutputs

Suatu Rencana Produksi: keputusan secara agregat Suatu Rencana Produksi: keputusan secara agregat tentangtentang Jumlah tenaga kerja (Jumlah tenaga kerja (workforce level)workforce level) Tingkat persediaanTingkat persediaan Tingkat produksiTingkat produksi secara secara agregatagregat pada setiap periode dalam horizon pada setiap periode dalam horizon

perencanaan.perencanaan. Total biaya produksi yang “terbaik” selama Total biaya produksi yang “terbaik” selama

horizon perencanaan.horizon perencanaan. Proyeksi biaya jika rencana produksi dilaksanakan. Proyeksi biaya jika rencana produksi dilaksanakan.

Page 10: Production Planning

10

Penyesuaian Kapasitas dalam horizon MediumPenyesuaian Kapasitas dalam horizon MediumPenyesuaian Kapasitas dalam horizon MediumPenyesuaian Kapasitas dalam horizon Medium

Jumlah tenaga kerjaJumlah tenaga kerja Hire or layoff full-time workersHire or layoff full-time workers Hire or layoff part-time workersHire or layoff part-time workers Hire or layoff contract workers Hire or layoff contract workers

Pendayagunaan tenaga kerjaPendayagunaan tenaga kerja OvertimeOvertime Idle time (undertime) Idle time (undertime) Reduce hours workedReduce hours worked

Jumlah persediaanJumlah persediaan Finished goods inventoryFinished goods inventory Backorders/lost salesBackorders/lost sales

SubcontractSubcontract

Page 11: Production Planning

11

ApproachesApproachesApproachesApproaches

Informal or Trial-and-Error Approach (Graphical Informal or Trial-and-Error Approach (Graphical Method)Method)

Mathematically Optimal ApproachesMathematically Optimal Approaches Linear ProgrammingLinear Programming Linear Decision RulesLinear Decision Rules

Computer SearchComputer Search HeuristicsHeuristics

Page 12: Production Planning

12

Comparison of Aggregate Planning MethodsComparison of Aggregate Planning Methods

MethodMethod AdvantagesAdvantages LimitationsLimitations

GraphicalGraphical Sederhana, mudah digunakan

dan dipahami

Banyak solusi; dan tidak optimal

Linear Linear ProgrammingProgramming

Memberikan solusi optimal Analisis sensitifitas dan dual

memberikan informasi yang berguna.

Kendala dapat segera dimasukkan

Fungsi matematis: harus linear, bersifat deterministik, menggunakan asumsi yang tidak terlalu realistis.

Page 13: Production Planning

13

Perbandingan antar Aggregate Planning MethodsPerbandingan antar Aggregate Planning Methods

MethodMethod AdvantagesAdvantages LimitationsLimitations

Linear Decision Rules

Memberikan solusi optimal Dapat untuk permintaan

yang bersifat non-deterministic

Menggunakan beberapa komponen biaya yang non-standard

Membutuhkan Skilled personal Model Quadratic tidak selalu

realistik. Tidak menjamin solusi yang

optimal.

Management Coefficients

Model

Sederhana, mudah digunakan dan dipahami.

Merupakan upaya untuk menduplikasi proses pengambilan keputusan manager.

Mudah diterapkan.

Solusi tidak optimal. Berasumsi bahwa keputusan yg

diambil pada masa lalu adalah baik. Model dibangun atas dasar

“individual” dan bisa tidak sahih. (individual’s invalidate model)

Page 14: Production Planning

14

Perbandingan antar Aggregate Planning MethodsPerbandingan antar Aggregate Planning Methods

MethodMethod AdvantagesAdvantages LimitationsLimitations

Simulation

Tidak ada batasan pada fungsi biaya tertentu atau struktur matematis.

Dapat menguji berbagai keterkaitan atau hubungan.

Tidak menjamin solusi yang optimal.

Seringkali merupakan proses yang panjang dan mahal.

Page 15: Production Planning

15

Pure Strategies for the Informal ApproachPure Strategies for the Informal ApproachPure Strategies for the Informal ApproachPure Strategies for the Informal Approach

Matching Demand (Chase Strategy)Matching Demand (Chase Strategy) Level Capacity (Level Strategy)Level Capacity (Level Strategy)

Penyanggaan dengan persediaan (Penyanggaan dengan persediaan (Buffering with Buffering with inventory)inventory)

Penyanggaan dengan mekanisme Penyanggaan dengan mekanisme backlogbacklog ((Buffering with backlog)Buffering with backlog)

Penyanggaan dengan mekanisme lembur dan Penyanggaan dengan mekanisme lembur dan subkontrak (subkontrak (Buffering with overtime or Buffering with overtime or subcontracting)subcontracting)

Page 16: Production Planning

16

Page 17: Production Planning

17

Matching Demand Strategy (Chase strategy)Matching Demand Strategy (Chase strategy)Matching Demand Strategy (Chase strategy)Matching Demand Strategy (Chase strategy)

Kapasitas (produksi) pada setiap periode persis sama Kapasitas (produksi) pada setiap periode persis sama dengan forecasted aggregate demand dengan forecasted aggregate demand

Variasi kapasitas (produksi) dilakukan dengan Variasi kapasitas (produksi) dilakukan dengan memvariasikan jumlah tenaga kerja. memvariasikan jumlah tenaga kerja.

Persediaan produk akhir – minimal.Persediaan produk akhir – minimal. Biaya tenaga kerja dan bahan cenderung tinggi, Biaya tenaga kerja dan bahan cenderung tinggi,

karena intensitas perubahan yang tinggi.karena intensitas perubahan yang tinggi.

Page 18: Production Planning

18

Mengembangkan dan Mengevaluasi Mengembangkan dan Mengevaluasi Chase Chase Production PlanProduction Plan

Mengembangkan dan Mengevaluasi Mengembangkan dan Mengevaluasi Chase Chase Production PlanProduction Plan

Tingkat produksi ditentukan atas dasar Tingkat produksi ditentukan atas dasar the forecasted the forecasted aggregate demandaggregate demand

The forecasted aggregate demandThe forecasted aggregate demand dikonevrsi ke dikonevrsi ke jumlah jumlah tenaga kerja yang dibutuhkan dengan jumlah jumlah tenaga kerja yang dibutuhkan dengan menggunakan informasi waktu baku produksi. menggunakan informasi waktu baku produksi.

Biaya utama dari strategi ini adalah biaya akibat Biaya utama dari strategi ini adalah biaya akibat perubahan jumlah tenaga kerja dari waktu ke waktu, perubahan jumlah tenaga kerja dari waktu ke waktu, dalam hal ini biaya dalam hal ini biaya hirings hirings dandan layoffs layoffs

Page 19: Production Planning

19

Level Capacity StrategyLevel Capacity StrategyLevel Capacity StrategyLevel Capacity Strategy

Kapasitas (tingkat produksi) dipertahankan tetap Kapasitas (tingkat produksi) dipertahankan tetap (konstan) selama horizon perencanaan. (konstan) selama horizon perencanaan.

Selisih antara tingkat produksi yang konstan dan Selisih antara tingkat produksi yang konstan dan tingkat permintaan di sangga (buffered) dengan tingkat permintaan di sangga (buffered) dengan inventory, backlog, overtime, part-time labor and/or inventory, backlog, overtime, part-time labor and/or subcontractingsubcontracting

Page 20: Production Planning

20

Mengembangkan dan Mengevaluasi Mengembangkan dan Mengevaluasi the Level the Level Production PlanProduction Plan

Mengembangkan dan Mengevaluasi Mengembangkan dan Mengevaluasi the Level the Level Production PlanProduction Plan

Menetapkan jumlah produksi yang tetap setiap Menetapkan jumlah produksi yang tetap setiap periode, tanpa dilakukan perubahan jumlah tenaga periode, tanpa dilakukan perubahan jumlah tenaga kerja. kerja.

Selisih antara jumlah produksi yang direncanakan dan Selisih antara jumlah produksi yang direncanakan dan prakiraan permintaan dipenuhi dengan persediaan prakiraan permintaan dipenuhi dengan persediaan atau dengan atau dengan backordersbackorders, dalam hal ini tidak ada atau , dalam hal ini tidak ada atau tidak dilakukan tidak dilakukan overtime, idle time, dan overtime, idle time, dan subcontractingsubcontracting

. . . more. . . more

Page 21: Production Planning

21

Mengembangkan dan Mengevaluasi Mengembangkan dan Mengevaluasi the Level the Level Production PlanProduction Plan

Mengembangkan dan Mengevaluasi Mengembangkan dan Mengevaluasi the Level the Level Production PlanProduction Plan

Biaya utama dari strategi ini adalah biaya menahan Biaya utama dari strategi ini adalah biaya menahan (kelebihan) persediaan dan biaya kekurangan (kelebihan) persediaan dan biaya kekurangan persediaan (persediaan (inventory carrying and backlogging inventory carrying and backlogging costs)costs)

Tingkat persediaan (lebih atau kurang) pada akhir Tingkat persediaan (lebih atau kurang) pada akhir periode ditentukan dengan formula periode ditentukan dengan formula inventory inventory balance equation:balance equation:

EIEIt t = EI= EIt-1t-1 + (P + (Ptt - D - Dtt ) )

Page 22: Production Planning

22

Rencana Aggregate untuk JasaRencana Aggregate untuk JasaRencana Aggregate untuk JasaRencana Aggregate untuk Jasa

Untuk produk Jasa yang standardized, perencanaan aggregate Untuk produk Jasa yang standardized, perencanaan aggregate lebih sederhana dibandingkan dengan sistem produksi yang lebih sederhana dibandingkan dengan sistem produksi yang memproduksi customized services memproduksi customized services

Untuk customized services,Untuk customized services, Terdapat kesulitan dalam menentukan sifat dan spesifikasi Terdapat kesulitan dalam menentukan sifat dan spesifikasi

operasi yang harus dilaksanakan untuk setiap pelanggan. operasi yang harus dilaksanakan untuk setiap pelanggan. Pelanggan dapat merupakan bagian integral dari sistem Pelanggan dapat merupakan bagian integral dari sistem

produksi. produksi. Jasa bersifat intangible (tidak fisik) sehingga tidak ada Jasa bersifat intangible (tidak fisik) sehingga tidak ada

“istilah” “istilah” finished-goods inventoriesfinished-goods inventories yang dapat digunakan yang dapat digunakan sebagai sebagai bufferbuffer antara kapasitas dan permintaan. antara kapasitas dan permintaan.

Page 23: Production Planning

23

Preemptive TacticsPreemptive TacticsPreemptive TacticsPreemptive Tactics

There may be ways to manage the extremes of There may be ways to manage the extremes of demand:demand: Discount prices during the valleys.... have a saleDiscount prices during the valleys.... have a sale Peak-load pricing during the highs .... electric Peak-load pricing during the highs .... electric

utilities, Nucorutilities, Nucor

Page 24: Production Planning

24

Option Advantage Disadvantage Some

Comments

Changing

inventory levels

Changes in

human resourcesare gradual, notabrupt

productionchanges

Inventory

holding costs;Shortages mayresult in lost

sales

Applies mainly

to production,not service,operations

Varyingworkforce size

by hiring orlayoffs

Avoids use ofother alternatives

Hiring, layoff,and training

costs

Used where sizeof labor pool is

large

Advantages/DisadvantagesAdvantages/Disadvantages

Page 25: Production Planning

25

Option Advantage Disadvantage SomeComments

Varyingproduction ratesthrough overtimeor idle time

Matches seasonalfluctuationswithouthiring/trainingcosts

Overtimepremiums, tiredworkers, may notmeet demand

Allowsflexibility withinthe aggregateplan

Subcontracting Permitsflexibility andsmoothing of thefirm's output

Loss of qualitycontrol; reducedprofits; loss offuture business

Applies mainlyin productionsettings

Advantages/Disadvantages - ContinuedAdvantages/Disadvantages - ContinuedAdvantages/Disadvantages - ContinuedAdvantages/Disadvantages - Continued

Page 26: Production Planning

26

Advantages/Disadvantages - ContinuedAdvantages/Disadvantages - ContinuedAdvantages/Disadvantages - ContinuedAdvantages/Disadvantages - Continued

Option Advantage Disadvantage SomeComments

Using part-timeworkers

Less costly andmore flexiblethan full-timeworkers

Highturnover/trainingcosts; qualitysuffers;schedulingdifficult

Good forunskilled jobs inareas with largetemporary laborpools

Influencingdemand

Tries to useexcess capacity.Discounts drawnew customers.

Uncertainty indemand. Hard tomatch demand tosupply exactly.

Createsmarketing ideas.Overbookingused in somebusinesses.

Page 27: Production Planning

27

Advantage/Disadvantage - ContinuedAdvantage/Disadvantage - ContinuedAdvantage/Disadvantage - ContinuedAdvantage/Disadvantage - Continued

Option Advantage Disadvantage SomeComments

Back orderingduring high-demand periods

May avoidovertime. Keepscapacity constant

Customer mustbe willing towait, butgoodwill is lost.

Many companiesbackorder.

Counterseasonalproducts andservice mixing

Fully utilizesresources; allowsstable workforce.

May requireskills orequipmentoutside a firm'sareas ofexpertise.

Risky findingproducts orservices withopposite demandpatterns.

Page 28: Production Planning

28

Kasus Perencanaan AgregatKasus Perencanaan AgregatKasus Perencanaan AgregatKasus Perencanaan Agregat

Suatu industri memproduksi beragam Candy. Berdasarkan hasil prakiraan Suatu industri memproduksi beragam Candy. Berdasarkan hasil prakiraan dalam periode triwulan pada tahun yang akan datang adalah sbb:dalam periode triwulan pada tahun yang akan datang adalah sbb:

Kuartal 1Kuartal 1 : 80.000 unit: 80.000 unitKuartal 2Kuartal 2 : 50.000 unit: 50.000 unitKuartal 3Kuartal 3 :120.000 unit:120.000 unitKuartal 4Kuartal 4 :150.000 unit:150.000 unit

Tingkat produksi ditentukan oleh jumlah tenaga kerja, yang mana setiap Tingkat produksi ditentukan oleh jumlah tenaga kerja, yang mana setiap pekerja mampu memproduksi 1000 unit per kuartal. Jumlah tenaga kerja pekerja mampu memproduksi 1000 unit per kuartal. Jumlah tenaga kerja pada awal perencanaan: 100 orang. Untuk meningkatkan kapasitas pada awal perencanaan: 100 orang. Untuk meningkatkan kapasitas produksi perusahaan dapat menambah tanaga kerja dengan biaya $ 100 per produksi perusahaan dapat menambah tanaga kerja dengan biaya $ 100 per orang, dan jika menurunkan kapasitas produksi, perusahaan dapat mem orang, dan jika menurunkan kapasitas produksi, perusahaan dapat mem PHK dengan konsekuensi biaya $ 500 per orang. PHK dengan konsekuensi biaya $ 500 per orang.

Perusahaan mengambil kebijakan tidak boleh terjadi kekurangan stok produk, Perusahaan mengambil kebijakan tidak boleh terjadi kekurangan stok produk, apabila terjadi kelebihan stok biaya menahan persediaan: $ 0,50 per unit apabila terjadi kelebihan stok biaya menahan persediaan: $ 0,50 per unit per kuartal.per kuartal.

? Apakah perusahaan mengambil skenario Level Startegy atau Chase Strategy ? Apakah perusahaan mengambil skenario Level Startegy atau Chase Strategy dalam menentukan rencana produksi pada tahun yang akan datang.dalam menentukan rencana produksi pada tahun yang akan datang.

Page 29: Production Planning

29

Skenario Level StrategySkenario Level StrategySkenario Level StrategySkenario Level Strategy

Terdapat beberapa alternatif dalam menentukan tingkat Terdapat beberapa alternatif dalam menentukan tingkat produksi yang tetap setiap kuartal:produksi yang tetap setiap kuartal: Berdasarkan kapasitas produksi (jumlah pekerja) Berdasarkan kapasitas produksi (jumlah pekerja)

yang ada.yang ada. Berdasarkan rata-rata permintaan selama 4 kuartal.Berdasarkan rata-rata permintaan selama 4 kuartal.Yang penting harus memenuhi kendala bahwa setiap Yang penting harus memenuhi kendala bahwa setiap

kuartal tidak boleh terjadi kekurangan produk, kuartal tidak boleh terjadi kekurangan produk, yang dapat dicek dengan menggunakan kurva yang dapat dicek dengan menggunakan kurva kumulatif produksi dan kumulatif demand.kumulatif produksi dan kumulatif demand...

Jika digunakan alternatif rata-rata permintaan Jika digunakan alternatif rata-rata permintaan tingkat produksi per kuartal : 100.000 unittingkat produksi per kuartal : 100.000 unit

Page 30: Production Planning

30

050000

100000150000200000250000300000350000400000450000

I II III IV

Kuartal

Unit Kum Demand

Kum Produksi

Kumulatif produksi di atas kumulatif demand (atau garis kumulatif demand dan produksi tidal berpotongan) tidak terjadi kekurangan stok

Page 31: Production Planning

31

Aplikasi Linear ProgrammingAplikasi Linear ProgrammingAplikasi Linear ProgrammingAplikasi Linear Programming

Variabel keputusan:Variabel keputusan: Jumlah Tenaga kerja Jumlah Tenaga kerja Jumlah Produksi Jumlah Produksi Jumlah yg direkrut / PHKJumlah yg direkrut / PHK Jumlah InventoryJumlah Inventory

Tujuan Minimasi Total Biaya = Biaya Tenaga kerja +Tujuan Minimasi Total Biaya = Biaya Tenaga kerja + Biaya Inventory.Biaya Inventory.Minimasi Z = 100 (H1+H2+H3+H4) + Minimasi Z = 100 (H1+H2+H3+H4) +

500(F1+F2+F3+F4) + 0,50 500(F1+F2+F3+F4) + 0,50 (I1+I2+I3+I4)(I1+I2+I3+I4)

dengan kendala dengan kendala

Page 32: Production Planning

32

Kendala permintaan:Kendala permintaan:

It = IIt = It-1t-1 + Pt – Dt + Pt – Dt

t=1 t=1 P1 – I1 + Io = 80000. P1 – I1 + Io = 80000.

t=2 t=2 P2 – I2 + I1 = 50000. P2 – I2 + I1 = 50000.

t=3 t=3 P3 – I3 + I2 = 120000 P3 – I3 + I2 = 120000

t=4 t=4 P4 – I4 + I3 = 150000 P4 – I4 + I3 = 150000 Kendala Produksi Kendala Produksi Pt = 1000 Wt Pt = 1000 Wt Kendala Tenaga Kerja: Wt =WKendala Tenaga Kerja: Wt =Wt-1 t-1 + Ht - Ft+ Ht - Ft

t=1 t=1 W1 + F1– H1 - Wo = 0. W1 + F1– H1 - Wo = 0.

t=2 t=2 W2 + F2 – H2 - W1 = 0. W2 + F2 – H2 - W1 = 0.

t=3 t=3 W3 + F3 – H3 – W2= 0 W3 + F3 – H3 – W2= 0

t=4 t=4 W4 + F4 – H4 – W4= 0 W4 + F4 – H4 – W4= 0

Page 33: Production Planning

33

Solusi OptimalSolusi OptimalSolusi OptimalSolusi Optimal

P1 = 80 P1 = 80 W1=80 W1=80F1=20 & H1=0F1=20 & H1=0I1=0I1=0 P2 = 80 P2 = 80 W2=80 W2=80F2=0 & H2=0 F2=0 & H2=0 I2=30 I2=30 P3 = 90 P3 = 90 W3=90 W3=90F3=0 & H3=10 F3=0 & H3=10 I3=0I3=0 P4 = 150P4 = 150 W4=150 W4=150F4=0&H4=60 F4=0&H4=60 I4=0I4=0

Total Biaya $32.000,-Total Biaya $32.000,-

Page 34: Production Planning

34

A small manufacturing company with 200 employees produces umbrellas. The company produces the following three product lines: 1) the Executive Line, 2) the Durable Line and 3) the Compact line, as shown in the below

Executive Line

Durable Line

Compact Line

Aggregate Planning ExampleAggregate Planning ExampleAggregate Planning ExampleAggregate Planning Example

Page 35: Production Planning

35

0

2000

4000

6000

8000

10000

J a n Fe b Ma r Apr Ma y J un

45005500

7000

10000

8000

6000

Number of working days:Jan: 22Feb: 19Mar: 21Apr: 21May: 22Jun: 20

Aggregate Planning Example: Aggregate Planning Example: Demand for Executive UmbrellasDemand for Executive UmbrellasAggregate Planning Example: Aggregate Planning Example:

Demand for Executive UmbrellasDemand for Executive Umbrellas

Page 36: Production Planning

36

Aggregate Planning Example: Aggregate Planning Example: Cost Information for Executive UmbrellasCost Information for Executive Umbrellas

Aggregate Planning Example: Aggregate Planning Example: Cost Information for Executive UmbrellasCost Information for Executive Umbrellas

Materials $5.00 /unitHolding costs $1.00 /unit/monthMarginal cost of stockout $1.25 /unit/monthHiring & training cost $200.00 /workerLayoff costs $250.00 /workerLabor hours required 0.15 hrs/unit

Straight time labor cost $8.00 /hrBeginning inventory 250 unitsProductive hours 7.25 hrs/worker/dayPaid straight hours 8 hrs/dayBeginning # of workers 7 workers

Page 37: Production Planning

37

Aggregate Planning Example: Aggregate Planning Example: Determining Straight Labor Costs and Output for Executive UmbrellasDetermining Straight Labor Costs and Output for Executive Umbrellas

Aggregate Planning Example: Aggregate Planning Example: Determining Straight Labor Costs and Output for Executive UmbrellasDetermining Straight Labor Costs and Output for Executive Umbrellas

Jan Feb Mar Apr May JunDays/mo 22 19 21 21 22 20Hrs/worker/mo 159.5 137.75 152.25 152.25 159.5 145Units/worker 1063.33 918.33 1015 1015 1063.33 966.67$/worker $1,408 1,216 1,344 1,344 1,408 1,280

January159.5 = 22 [days/month] * 7.25 [productive hrs/worker]1063.33 = 159.5 [hrs/worker/month] / .15 [hrs/unit]$1,408 = 8 [$/hr] * 8 [paid hrs/day] * 22 [days/month]

Page 38: Production Planning

38

Aggregate Planning Example: Aggregate Planning Example: Determining Straight Labor Costs and Output for Executive UmbrellasDetermining Straight Labor Costs and Output for Executive Umbrellas

Aggregate Planning Example: Aggregate Planning Example: Determining Straight Labor Costs and Output for Executive UmbrellasDetermining Straight Labor Costs and Output for Executive Umbrellas

Aggregate Planning ProblemJan Feb Mar Apr May Jun

Days/month 22 19 21 21 22 20Hrs/worker/month 160 138 152 152 160 145Units/worker 1,063 918 1,015 1,015 1,063 967Labor cost/worker $1,408.00 $1,216.00 $1,344.00 $1,344.00 $1,408.00 $1,280.00

Page 39: Production Planning

39

• 4,500 units is the demand in January (any combination of firm orders and forecast

• 250 is the starting inventory position• 4,250 = 4,500 – 250• 3.997 = 4,250 / 1,063.33• 7 = workforce level at the beginning of

January• 3 = 7 – 4 = workers fired• 4 = workforce level at end of January• 0 = ending inventory level

JanDays/mo 22Hrs/worker/mo 159.5Units/worker 1,063.33$/worker $1,408

JanDemand 4,500Beg. inv. 250Net req. 4,250Req. workers 3.997HiredFired 3Workforce 4Ending inventory 0

Aggregate Planning ExampleAggregate Planning ExampleChase Strategy for Executive UmbrellasChase Strategy for Executive Umbrellas

Aggregate Planning ExampleAggregate Planning ExampleChase Strategy for Executive UmbrellasChase Strategy for Executive Umbrellas

• Objective: Adjust workforce level so as to eliminate the need to carry inventory from period to period

Page 40: Production Planning

40

Aggregate Planning ExampleAggregate Planning ExampleChase Strategy for Executive UmbrellasChase Strategy for Executive Umbrellas

Aggregate Planning ExampleAggregate Planning ExampleChase Strategy for Executive UmbrellasChase Strategy for Executive Umbrellas

Chase StrategyJan Feb Mar Apr May Jun

Demand 4,500 5,500 7,000 10,000 8,000 6,000Beginning inventory 250 0 0 0 0 0Net requirements 4,250 5,500 7,000 10,000 8,000 6,000Beginning # of workers 7 4 6 7 10 8Required workers 4 6 7 10 8 6Workforce adjustment -3 2 1 3 -2 -1Production quantity 4,250 5,500 7,000 10,000 8,000 6,000Ending inventory 0 0 0 0 0 0

Page 41: Production Planning

41

Aggregate Planning ExampleAggregate Planning ExampleChase Strategy for Executive UmbrellasChase Strategy for Executive Umbrellas

Aggregate Planning ExampleAggregate Planning ExampleChase Strategy for Executive UmbrellasChase Strategy for Executive Umbrellas

January costs: $21,250.00 = 4,250 [units] * $5 [$/unit]$ 5,627.59 = 3.997 [workers] * 1,408 [$/worker]$ 750.00 = 3 [workers fired] * 250 [$/worker fired]

Chase Strategy CostsJan Feb Mar Apr May Jun

Material cost $21,250.00 $27,500.00 $35,000.00 $50,000.00 $40,000.00 $30,000.00 $203,750.00Labor cost $5,628.00 $7,283.00 $9,269.00 $13,242.00 $10,594.00 $7,945.00 $53,961.00Hiring cost $0.00 $400.00 $200.00 $600.00 $0.00 $0.00 $1,200.00Firing cost $750.00 $0.00 $0.00 $0.00 $500.00 $250.00 $1,500.00Inventory holding cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Inventory stockout cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL: $260,411.00

Page 42: Production Planning

42

Aggregate Planning ExampleAggregate Planning ExampleLevel Strategy for Executive UmbrellasLevel Strategy for Executive Umbrellas

JanDemand 4,500Beg. inv. 250Net req. 4,250Workers 6Production 6,380Ending inventory 2,130Surplus 2,130Shortage

• Objective: Mengatur jumlah inventory sehingga menghilangkan perubahan jumlah tenaga kerja (tidak perlu hire dan fire dari periode ke periode)

• Assume that January is started with 6 employees

• 6,380 = 6 [employees] * 1,063.33 [units/worker]

• 2,130 = 6,380 – 4,250 (surplus)

Page 43: Production Planning

43

Aggregate Planning ExampleAggregate Planning ExampleLevel Strategy for Executive UmbrellasLevel Strategy for Executive Umbrellas

Level Capacity StrategyJan Feb Mar Apr May Jun

Demand 4,500 5,500 7,000 10,000 8,000 6,000Beginning inventory 250 2,130 2,140 1,230 -2,680 -4,300Net requirements 4,250 3,370 4,860 8,770 10,680 10,300Beginning # of workers 6 6 6 6 6 6Required workers 4 4 5 9 10 11Workforce adjustment 0 0 0 0 0 0Production quantity 6,380 5,510 6,090 6,090 6,380 5,800Ending inventory 2,130 2,140 1,230 -2,680 -4,300 -4,500

Page 44: Production Planning

44

Aggregate Planning ExampleAggregate Planning ExampleLevel Strategy for Executive UmbrellasLevel Strategy for Executive Umbrellas

January costs: $8,448 = 6 [workers] * $1,408 [$/worker]$ 31,900 = 6,380 [units] * $5 [$/unit]$ 2,130 = 2,130 [surplus units] * $1 [$/unit held/month]

Level Capacity Strategy CostsJan Feb Mar Apr May Jun Total

Material cost $31,900.00 $27,550.00 $30,450.00 $30,450.00 $31,900.00 $29,000.00 $181,250.00Labor cost $8,448.00 $7,296.00 $8,064.00 $8,064.00 $8,448.00 $7,680.00 $48,000.00Hiring cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Firing cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00Inventory holding cost $2,130.00 $2,140.00 $1,230.00 $0.00 $0.00 $0.00 $5,500.00Inventory stockout cost $0.00 $0.00 $0.00 $3,350.00 $5,375.00 $5,625.00 $14,350.00

TOTAL: $249,100.00

Page 45: Production Planning

45

Aggregate Planning ExampleAggregate Planning ExampleWhich Plan is Cheaper?Which Plan is Cheaper?

Level CapacityLevel Capacity ChaseChase

$249,100.00 $260,411.00

Kesimpulan: rencana dengan kapasitas tetap (level capacity) lebih rendah biayanya dibandingkan kapasitas produksi bervariasi dari waktu ke waktu, selama periode perencanaan.

Catatan: penggunaan chase strategy dapat mengakibatkan permasalahan yang bersifat intangibles, seperti loyalitas dan komitmen karyawan, yang berdampak negatif terhadap perusahaan.

Page 46: Production Planning

• Hasil prakiraan permintaan produk suatu industri selama bulan Januari s/d April 2009 serta jumlah hari kerja efektif per bulan disajikan pada Tabel berikut:

• Jam kerja reguler per hari adalah 8 jam kerja, dan apabila diperlukan perusahaan menerapkan jam lembur . Pada bulan Desember 2008 jumlah tenaga kerja yang ada adalah sebanyak 50 orang. Berdasarkan hasil pengukuran kerja, waktu standar untuk menghasilkan 1 unit produk adalah 5 jam kerja-orang. Pada akhir bulan Desember 2008 diprediksi bahwa stok produk yang ada adalah sebesar 300 unit. Diketahui bahwa upah tenaga kerja pada Jam reguler adalah Rp. 8000/jam/orang, dan jika bekerja lembur maka upah nya adalah Rp. 12000/jam./orang. Perusahaan mengambil kebijakan:

Bulan Permintaan (unit)

Hari kerja

Januari 2500 24Februari 1500 20Maret 2250 24April 2200 24

Page 47: Production Planning

• Tidak melakukan penambahan atau pengurangan tenaga kerja, serta boleh terjadi kelebihan stok tetapi tidak boleh terjadi kekurangan stok produk. Apabila produksi melebihi permintaan, maka biaya penyimpanan produk adalah sebesar Rp. 4000/unit/bulan. Untuk perencanaan produksi 4 bulan mendatang manajemen menetapkan skenario, yaitu:

• • Melakukan produksi untuk memenuhi

permintaan pada jam reguler dan jika terjadi kekurangan, kekurangannya dipenuhi dengan berproduksi pada jam lembur dengan ketentuan maksimal 3 jam per orang per hari.– Berapa kali dalam periode perencanaan perusahaan

mengalami kelebihan stok produk.– Berapa total biaya produksi dengan skenario yang

diambil oleh manajemen.

Page 48: Production Planning

48

Aggregate Planning ExampleAggregate Planning Example Computer ApplicationComputer Application

Aggregate Planning ExampleAggregate Planning Example Computer ApplicationComputer Application

Page 49: Production Planning

49

Aggregate Planning ExampleAggregate Planning Example Computer ApplicationComputer Application

Aggregate Planning ExampleAggregate Planning Example Computer ApplicationComputer Application

Page 50: Production Planning

50

Aggregate Planning ExampleAggregate Planning ExampleAggregate Planning ExampleAggregate Planning Example

Page 51: Production Planning

51

Master Production Scheduling (MPS)(Jadwal Induk Produksi)

Page 52: Production Planning

52

Objectives of MPSObjectives of MPSObjectives of MPSObjectives of MPS

Determine the quantity and timing of completion of Determine the quantity and timing of completion of end items over a short-range planning horizon.end items over a short-range planning horizon.

Schedule end items (finished goods and parts shipped Schedule end items (finished goods and parts shipped as end items) to be completed promptly and when as end items) to be completed promptly and when promised to the customer.promised to the customer.

Avoid overloading or underloading the production Avoid overloading or underloading the production facility so that production capacity is efficiently facility so that production capacity is efficiently utilized and low production costs result. utilized and low production costs result.

Page 53: Production Planning

53

The rules for schedulingThe rules for scheduling

No ChangeNo Change+/- 5%+/- 5%

ChangeChange

+/- 10%+/- 10%

ChangeChange

+/- 20%+/- 20%

ChangeChange

+/- 20%+/- 20%

ChangeChangeFrozenFrozen

FirmFirm

FullFullOpenOpen

1-21-2 weeksweeks

2-42-4weeksweeks

4-64-6weeksweeks

6+ 6+ weeksweeks

Time FencesTime FencesTime FencesTime Fences

Page 54: Production Planning

54

Time FencesTime FencesTime FencesTime Fences

The rules for scheduling:The rules for scheduling: Do not change orders in the frozen zoneDo not change orders in the frozen zone Do not exceed the agreed on percentage changes Do not exceed the agreed on percentage changes

when modifying orders in the other zoneswhen modifying orders in the other zones Try to level load as much as possibleTry to level load as much as possible Do not exceed the capacity of the system when Do not exceed the capacity of the system when

promising orders.promising orders. If an order must be pulled into level load, pull it If an order must be pulled into level load, pull it

into the earliest possible week without missing the into the earliest possible week without missing the promise.promise.

Page 55: Production Planning

55

Developing an MPSDeveloping an MPSDeveloping an MPSDeveloping an MPS

Using input informationUsing input information Customer orders (end items quantity, due dates)Customer orders (end items quantity, due dates) Forecasts (end items quantity, due dates)Forecasts (end items quantity, due dates) Inventory status (balances, planned receipts)Inventory status (balances, planned receipts) Production capacity (output rates, planned Production capacity (output rates, planned

downtime)downtime) Schedulers place orders in the earliest available open Schedulers place orders in the earliest available open

slot of the MPSslot of the MPS . . . more. . . more

Page 56: Production Planning

56

Developing an MPSDeveloping an MPSDeveloping an MPSDeveloping an MPS

Schedulers must:Schedulers must: estimate the total demand for products from all estimate the total demand for products from all

sourcessources assign orders to production slotsassign orders to production slots make delivery promises to customers, andmake delivery promises to customers, and make the detailed calculations for the MPSmake the detailed calculations for the MPS

Page 57: Production Planning

57

Example: Master Production SchedulingExample: Master Production SchedulingExample: Master Production SchedulingExample: Master Production Scheduling

Arizona Instruments produces bar code Arizona Instruments produces bar code scanners for consumers and other manufacturers on a scanners for consumers and other manufacturers on a produce-to-stock basis. The production planner is produce-to-stock basis. The production planner is developing an MPS for scanners for the next 6 weeks.developing an MPS for scanners for the next 6 weeks.

The minimum lot size is 1,500 scanners, and The minimum lot size is 1,500 scanners, and the safety stock level is 400 scanners. There are the safety stock level is 400 scanners. There are currently 1,120 scanners in inventory. The estimates currently 1,120 scanners in inventory. The estimates of demand for scanners in the next 6 weeks are shown of demand for scanners in the next 6 weeks are shown on the next slide.on the next slide.

Page 58: Production Planning

58

Example: Master Production SchedulingExample: Master Production SchedulingExample: Master Production SchedulingExample: Master Production Scheduling

Demand EstimatesDemand Estimates

CUSTOMERS CUSTOMERS

BRANCH WAREHOUSES BRANCH WAREHOUSES

MARKET RESEARCH MARKET RESEARCH

PRODUCTION RESEARCHPRODUCTION RESEARCH

500500

200200

00

1010

11

00

5050

300300

10001000

00

00

500500

400400

22 33 44

200200

000000

300300500500

00101000

700700

6655

10001000

200200

WEEKWEEK

Page 59: Production Planning

59

Example: Master Production SchedulingExample: Master Production SchedulingExample: Master Production SchedulingExample: Master Production Scheduling

ComputationsComputations

CUSTOMERS CUSTOMERS

BRANCH WAREHOUSES BRANCH WAREHOUSES

MARKET RESEARCH MARKET RESEARCH

PRODUCTION RESEARCHPRODUCTION RESEARCH

500500

200200

00

1010

11

00

5050

300300

10001000

00

00

500500

400400

22 33 44

200200

000000

300300500500

00101000

700700

6655

10001000

200200

WEEKWEEK

TOTAL DEMAND TOTAL DEMAND

BEGINNING INVENTORY BEGINNING INVENTORY

REQUIRED PRODUCTIONREQUIRED PRODUCTION

ENDING INVENTORYENDING INVENTORY

710710

11201120

00

410410 560560

15001500

410410

13501350

11601160

15001500

900900

560560

700700

12501250950950460460

46046011601160

150015001500150000

10101010 12001200

950950

Page 60: Production Planning

60

Example: Master Production SchedulingExample: Master Production SchedulingExample: Master Production SchedulingExample: Master Production Scheduling

MPS for Bar Code ScannersMPS for Bar Code Scanners

SCANNER PRODUCTIONSCANNER PRODUCTION 00 15001500 15001500 150015001500150000

11 22 33 44 6655

WEEKWEEK

Page 61: Production Planning

61

Rough-Cut Capacity PlanningRough-Cut Capacity PlanningRough-Cut Capacity PlanningRough-Cut Capacity Planning

As orders are slotted in the MPS, the effects on the As orders are slotted in the MPS, the effects on the production work centers are checkedproduction work centers are checked

Rough cut capacity planningRough cut capacity planning identifies underloading identifies underloading or overloading of capacityor overloading of capacity

Page 62: Production Planning

62

Example: Rough-Cut Capacity PlanningExample: Rough-Cut Capacity PlanningExample: Rough-Cut Capacity PlanningExample: Rough-Cut Capacity Planning

Texprint Company makes a line of computer Texprint Company makes a line of computer printers on a produce-to-stock basis for other printers on a produce-to-stock basis for other computer manufacturers. Each printer requires an computer manufacturers. Each printer requires an average of 24 labor-hours. The plant uses a backlog average of 24 labor-hours. The plant uses a backlog of orders to allow a level-capacity aggregate plan. of orders to allow a level-capacity aggregate plan. This plan provides a weekly capacity of 5,000 labor-This plan provides a weekly capacity of 5,000 labor-hours.hours.

Texprint’s rough-draft of an MPS for its Texprint’s rough-draft of an MPS for its printers is shown on the next slide. Does enough printers is shown on the next slide. Does enough capacity exist to execute the MPS? If not, what capacity exist to execute the MPS? If not, what changes do you recommend?changes do you recommend?

Page 63: Production Planning

63

Example: Rough-Cut Capacity PlanningExample: Rough-Cut Capacity PlanningExample: Rough-Cut Capacity PlanningExample: Rough-Cut Capacity Planning

Rough-Cut Capacity AnalysisRough-Cut Capacity Analysis

PRODUCTIONPRODUCTION 100100 200200 200200 280280250250

11 22 33 44 55

WEEKWEEK

TOTALTOTAL

10301030

LOADLOAD 24002400 48004800 48004800 6720672060006000 2472024720

CAPACITYCAPACITY 50005000 50005000 50005000 5000500050005000 2500025000

UNDERUNDER or or OVEROVER LOAD LOAD 26002600 200200 200200 1720172010001000 280280

Page 64: Production Planning

64

Example: Rough-Cut Capacity PlanningExample: Rough-Cut Capacity PlanningExample: Rough-Cut Capacity PlanningExample: Rough-Cut Capacity Planning

Rough-Cut Capacity AnalysisRough-Cut Capacity Analysis The plant is underloaded in the first 3 weeks The plant is underloaded in the first 3 weeks

(primarily week 1) and it is overloaded in the last 2 (primarily week 1) and it is overloaded in the last 2 weeks of the schedule.weeks of the schedule.

Some of the production scheduled for week 4 and Some of the production scheduled for week 4 and 5 should be moved to week 1.5 should be moved to week 1.

Page 65: Production Planning

65

Demand ManagementDemand ManagementDemand ManagementDemand Management

Review customer orders and promise shipment of Review customer orders and promise shipment of orders as close to request date as possibleorders as close to request date as possible

Update MPS at least weekly.... work with Marketing Update MPS at least weekly.... work with Marketing to understand shifts in demand patternsto understand shifts in demand patterns

Produce to order..... focus on incoming customer Produce to order..... focus on incoming customer ordersorders

Produce to stock ..... focus on maintaining finished Produce to stock ..... focus on maintaining finished goods levelsgoods levels

Planning horizon must be as long as the longest lead Planning horizon must be as long as the longest lead time itemtime item

Page 66: Production Planning

66

Types of Production-PlanningTypes of Production-Planningand Control Systemsand Control Systems

Page 67: Production Planning

67

Types of Production-PlanningTypes of Production-Planningand Control Systemsand Control Systems

Pond-Draining SystemsPond-Draining Systems Push SystemsPush Systems Pull SystemsPull Systems Focusing on BottlenecksFocusing on Bottlenecks

Page 68: Production Planning

68

Pond-Draining SystemsPond-Draining SystemsPond-Draining SystemsPond-Draining Systems

Emphasis on holding inventories (reservoirs) of Emphasis on holding inventories (reservoirs) of materials to support productionmaterials to support production

Little information passes through the systemLittle information passes through the system As the level of inventory is drawn down, orders are As the level of inventory is drawn down, orders are

placed with the supplying operation to replenish placed with the supplying operation to replenish inventoryinventory

May lead to excessive inventories and is rather May lead to excessive inventories and is rather inflexible in its ability to respond to customer needsinflexible in its ability to respond to customer needs

Page 69: Production Planning

69

Push SystemsPush SystemsPush SystemsPush Systems

Use information about customers, suppliers, and Use information about customers, suppliers, and production to manage material flowsproduction to manage material flows

Flows of materials are planned and controlled by a Flows of materials are planned and controlled by a series of production schedules that state when batches series of production schedules that state when batches of each particular item should come out of each stage of each particular item should come out of each stage of productionof production

Can result in great reductions of raw-materials Can result in great reductions of raw-materials inventories and in greater worker and process inventories and in greater worker and process utilization than pond-draining systemsutilization than pond-draining systems

Page 70: Production Planning

70

Pull SystemsPull SystemsPull SystemsPull Systems

Look only at the next stage of production and Look only at the next stage of production and determine what is needed there, and produce only thatdetermine what is needed there, and produce only that

Raw materials and parts are pulled from the back of Raw materials and parts are pulled from the back of the system toward the front where they become the system toward the front where they become finished goodsfinished goods

Raw-material and in-process inventories approach Raw-material and in-process inventories approach zerozero

Successful implementation requires much preparationSuccessful implementation requires much preparation

Page 71: Production Planning

71

Focusing on BottlenecksFocusing on BottlenecksFocusing on BottlenecksFocusing on Bottlenecks

Bottleneck OperationsBottleneck Operations Impede production because they have less capacity Impede production because they have less capacity

than upstream or downstream stagesthan upstream or downstream stages Work arrives faster than it can be completedWork arrives faster than it can be completed Binding capacity constraints that control the Binding capacity constraints that control the

capacity of the systemcapacity of the system Optimized Production Technology (OPT)Optimized Production Technology (OPT) Synchronous ManufacturingSynchronous Manufacturing

Page 72: Production Planning

72

Synchronous ManufacturingSynchronous ManufacturingSynchronous ManufacturingSynchronous Manufacturing

Operations performance measured byOperations performance measured by throughput (the rate cash is generated by sales)throughput (the rate cash is generated by sales) inventory (money invested in inventory), andinventory (money invested in inventory), and operating expenses (money spent in converting operating expenses (money spent in converting

inventory into throughput)inventory into throughput) . . . more. . . more

Page 73: Production Planning

73

Synchronous ManufacturingSynchronous ManufacturingSynchronous ManufacturingSynchronous Manufacturing

System of control based on: System of control based on: drum (bottleneck establishes beat or pace for other drum (bottleneck establishes beat or pace for other

operations)operations) buffer (inventory kept before a bottleneck so it is buffer (inventory kept before a bottleneck so it is

never idle), andnever idle), and rope (information sent upstream of the bottleneck rope (information sent upstream of the bottleneck

to prevent inventory buildup and to synchronize to prevent inventory buildup and to synchronize activities)activities)

Page 74: Production Planning

74

Wrap-Up: World-Class PracticeWrap-Up: World-Class PracticeWrap-Up: World-Class PracticeWrap-Up: World-Class Practice

Push systems dominate and can be applied to almost Push systems dominate and can be applied to almost any type of productionany type of production

Pull systems are growing in use. Most often applied Pull systems are growing in use. Most often applied in repetitive manufacturingin repetitive manufacturing

Few companies focusing on bottlenecks to plan and Few companies focusing on bottlenecks to plan and control production. control production.

Page 75: Production Planning

75

End of Chapter 13End of Chapter 13