 PERKIRAAN BIAYA PEMBUKAAN LAHAN PER HEKTAR 0 (Rupiah) HARGA SATUAN JUMLAH BIAYA HARGA SATUAN JUMLAH BIAYA 1. Lahan Bekas Hutan : Survey dan Blocking (Manual) 3 Peralatan, Bahan dll (PO) Babat - Imas (Manual) 10 o Excavator 6 JK 250,000 1,500,000 250000 1,500,000 Tebang 8 o Chainsaw 15 JK 10,000 150,000 10000 150,000 Stacking 13 o Alat Bantu 1 Ls 15,000 15,000 15000 15,000 Rumpuk 10 o Herbisida 3 Lt 30,000 90,000 30000 90,000 Pemberantasan Lalang 4 Sub Jumlah 1,755,000 1,755,000 Upah (PK) Sub Jumlah 48 o Tanaga Harian 48 HK 18,000 864,000 18000 864,000 o Mandor 4 HK 21,600 86,400 21600 86,400 Sub Jumlah 950,400 950,400 Jumlah 2,705,400 2,705,400 2. Lalang Sheet : Babat - Imas (Manual) 4 Peralatan, Bahan dll Tebang 2 o Herbisida 7 Lt 30,000 210,000 30000 210,000 Semprot Lalang 4 o Alat Bantu 1 Ls 5,000 5,000 5000 5,000 Koreksi Semprot Lalang 1 o Air & Transportasi 1 Ls 6,250 6,250 9765.625 9,766 Lain-lain 1 Sub Jumlah 221,250 224,766 Upah Sub Jumlah 12 o Tanaga Harian 12 HK 18,000 216,000 18000 216,000 o Mandor 0.5 HK 21,600 10,800 21600 10,800 Sub Jumlah 226,800 226,800 Jumlah 448,050 451,566 Rata-rata : o Lahan Bekas Hutan 80 % 2,705,400 2,164,320 2705400 2,164,320 o Lahan Lalang 20 % 448,050 89,610 451565.625 90,313 Jumlah 2,253,930 2,254,633 Jumlah Dibulatkan 2,254,000 2,255,000 PEKERJAAN HK URIAN VOLUME INTI PLASMA

Upload: wildan-kurnia

Post on 09-Oct-2015

1.618 views

Category:

Documents


351 download

DESCRIPTION

Hitungan LC

TRANSCRIPT

  • PERKIRAAN BIAYA PEMBUKAAN LAHAN PER HEKTAR0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    1. Lahan Bekas Hutan :Survey dan Blocking (Manual) 3 Peralatan, Bahan dll (PO)Babat - Imas (Manual) 10 o Excavator 6 JK 250,000 1,500,000 250000 1,500,000Tebang 8 o Chainsaw 15 JK 10,000 150,000 10000 150,000Stacking 13 o Alat Bantu 1 Ls 15,000 15,000 15000 15,000Rumpuk 10 o Herbisida 3 Lt 30,000 90,000 30000 90,000Pemberantasan Lalang 4 Sub Jumlah 1,755,000 1,755,000

    Upah (PK)Sub Jumlah 48 o Tanaga Harian 48 HK 18,000 864,000 18000 864,000

    o Mandor 4 HK 21,600 86,400 21600 86,400Sub Jumlah 950,400 950,400Jumlah 2,705,400 2,705,400

    2. Lalang Sheet :Babat - Imas (Manual) 4 Peralatan, Bahan dllTebang 2 o Herbisida 7 Lt 30,000 210,000 30000 210,000Semprot Lalang 4 o Alat Bantu 1 Ls 5,000 5,000 5000 5,000Koreksi Semprot Lalang 1 o Air & Transportasi 1 Ls 6,250 6,250 9765.625 9,766Lain-lain 1 Sub Jumlah 221,250 224,766

    UpahSub Jumlah 12 o Tanaga Harian 12 HK 18,000 216,000 18000 216,000

    o Mandor 0.5 HK 21,600 10,800 21600 10,800Sub Jumlah 226,800 226,800Jumlah 448,050 451,566Rata-rata :o Lahan Bekas Hutan 80 % 2,705,400 2,164,320 2705400 2,164,320o Lahan Lalang 20 % 448,050 89,610 451565.625 90,313Jumlah 2,253,930 2,254,633Jumlah Dibulatkan 2,254,000 2,255,000

    PEKERJAAN HK URIAN VOLUMEINTI PLASMA

  • LAMPIRAN V.2

    < MENU PERKIRAAN BIAYA PEMBIBITAN (SETARA SATU HEKTAR MAIN NURSERY)0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    PRE NURSERYPersiapan Bedeng 8 Peralatan, Bahan dllPeteduh 4 o Kecambah 16,000 biji 2,250 36,000,000 2250 36,000,000Pengumpulan Tanah 10 o Bahan Peteduh 1 Ls 50,000 50,000 50000 50,000Persiapan & Penyaringan Tanah 10 o Polybag 25 x 14 x 0,1 16,000 lembar 55 880,000 55 880,000Pengisian Polybag 85 o NPK 15.15.5.4 375 Kg 2,250 843,750 1700 637,500Penanaman Kecambah 16 o Pestisida 1 Lt 35,000 35,000 35000 35,000Penyiangan 17 o Alat Bantu 1 Ls 40,000 40,000 40000 40,000Merumput 40 o Transportasi 1 Ls 400,000 400,000 400000 400,000Seleksi 8 Sub Jumlah 38,248,750 38,042,500Penjaga 12Pemberantasan hama penyakit 8 UpahPemupukan 40 o Tanaga Harian 288 HK 18,000 5,184,000 18000 5,184,000Saluran Drainase 15 o Mandor 14 HK 21,600 302,400 21600 302,400Lain-lain 15 Sub Jumlah 5,486,400 5,486,400

    Sub Jumlah 288 Jumlah 43,735,150 43,528,900

    < MENU LAMPIRAN V.2. (LANJUTAN)PERKIRAAN BIAYA PEMBIBITAN PER HEKTAR

    0(Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    MAIN NURSERYPersiapan tempat 69 Peralatan, Bahan dllPenggalian & pengangkutan tanah 168 o Polybag 50 x 40 x 0,2 14,000 lembar 565 7,910,000 565 7,910,000Pengayakan tanah 64 o NPK 12.12.17.2 3,010 Kg 2,250 6,772,500 1700 5,117,000Penempatan Polybag 127 o Kieserite 665 Kg 1,400 931,000 1400 931,000Pengisian kantong 140 o Pestisida 1 lt 35,000 35,000 35000 35,000Pengajiran 12 o Alat Bantu 1 Ls 90,000 90,000 90000 90,000Pemeliharaan jalan & saluran 30 o Transportasi 1 Ls 25,000 25,000 39062.5 39,063Pemindahan 140 Sub Jumlah 15,763,500 14,122,063 Pemeliharaan tanah 80

    INTI PLASMAPEKERJAAN HK URIAN VOLUME

    PEKERJAAN HK URIAN VOLUMEINTI PLASMA

  • Pemberantasan hama penyakit 20 UpahPemupukan 80 o Tanaga Harian 1,440 HK 18,000 25,920,000 18000 25,920,000Penyiraman 360 o Mandor 72 HK 21,600 1,555,200 21600 1,555,200Pengangkutan & seleksi 80 Sub Jumlah 27,475,200 27,475,200 Sensus & seleksi 20 Penjaga 40 Jumlah 43,238,700 41,597,263 Lain-lain 10 Sub Jumlah 1,440 PENYEDIAAN BIBIT (Setara 1 Ha Tanam)Pembukaan Lahan 1 Ha 2,253,930 2,253,930 2,254,633 2,254,633Persiapan Lahan o Dozer 15 JK 300,000 4,500,000 300000 4,500,000

    o Grader 15 JK 200,000 3,000,000 200000 3,000,000Pre Nursery 1 Ls 43,735,150 43,735,150 43735150 43,735,150Main Nursery 1 Ls 43,238,700 43,238,700 43238700 43,238,700Beban investasi penyiraman 1 Ls 3,500,000 3,500,000 3500000 3,500,000

    Jumlah 100,227,780 100,228,483Bibit Siap Salur 11,440 11,440Nilai per Pokok Bibit 8,761 8,761Nilai Pembibitan Setara 1 Ha Tanam 1,252,847 1,252,856Jumlah Dibulatkan 1,253,000 1,253,000

    LAMPIRAN V.

    < MENU PERKIRAAN BIAYA PENANAMAN LCC PER HEKTAR0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    Tanam LCC 8 Peralatan, Bahan dllPemeliharaaan LCC 15 o Benih LCCMemupuk LCC 4 PJ 2 Kg 23,650 47,300 23650 47,300Lain-lain 2 CM 4 Kg 4,720 18,880 4720 18,880

    CP 4 Kg 3,650 14,600 3650 14,600Sub Jumlah 29 o RP 357.143 Kg 900 321,429 900 321,429

    o Alat Bantu 1 Ls 5,000 5,000 5000 5,000o Transportasi 1 Ls 15,500 15,500 15500 15,500Sub Jumlah 422,709 422,709

    Upaho Tenaga Harian 29 HK 18,000 522,000 18000 522,000o Mandor 2 HK 21,600 43,200 21600 43,200

    Sub Jumlah 565,200 565,200

    Jumlah 987,909 987,909

    INTI PLASMAPEKERJAAN HK URIAN VOLUME

  • Jumlah Dibulatkan 988,000 988,000

    LAMPIRAN V.3

    < MENU PERKIRAAN BIAYA PENANAMAN KELAPA SAWIT (TBM-0) PER HEKTAR0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    Mengukur dan Pancang 6 Peralatan, Bahan dllMelubang 2 o Excavator 1.2 JK 250,000 300,000 250000 300000Memupuk Lubang Tanam 1 o PupukPenanaman 11 Urea 47.6 Kg 1,450 69,020 1150 54,740Rawat TBM-0 RP 68 Kg 900 61,200 900 61,200o Pemupukan 2 MOP 20.4 Kg 1,800 36,720 1800 36,720o Dongkel Anak Kayu 1 Kieserite 13.6 Kg 1,400 19,040 1400 19,040o Piringan 5 Borat 0 Kg 5,025 0 5025 0o Gawangan Maual 6 CuSO4 0 Kg 4,570 0 4570 0Lain-lain 2 ZnSO4 0 Kg 2,550 0 2550 0

    Dolomit 0 Kg 250 0 250 0Sub Jumlah 36 o Herbisida 0.125 Lt 30,000 3,750 30000 3,750

    o Rodentisida 1 Kg 14,650 14,650 14650 14,650o Alat Bantu 1 Ls 5,000 5,000 5000 5,000o Transportasi 1 Ls 19,000 19,000 29687.5 29,688Sub Jumlah 528,380 524,788Upaho Tanaga Harian 36 HK 18,000 648,000 18000 648,000o Mandor 2 HK 21,600 43,200 21600 43,200Sub Jumlah 691,200 691,200Jumlah 1,219,580 1,215,988

    Jumlah Dibulatkan 1,220,000 1,216,000

    LAMPIRAN V.4

    < MENU PERKIRAAN BIAYA PEMELIHARAAN TBM-1 PER HEKTAR0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    Pemupukan 6 Peralatan, Bahan dllPiringan Manual 22.5 o Pupuk

    PEKERJAAN HK URIAN VOLUMEINTI PLASMA

    INTI PLASMAURIAN VOLUMEPEKERJAAN HK

  • Gawangan Manual 21 Urea 136 Kg 1,450 197,200 1150 156,400Dongkel Anak Kayu 3 RP 170 Kg 900 153,000 900 153,000Kontrol Lalang 9 MOP 115.6 Kg 1,800 208,080 1800 208,080Konsolidasi (Pembumbunan) 6 Kieserite 81.6 Kg 1,400 114,240 1400 114,240Pemeliharaan Parit 3 Borat 2.72 Kg 5,025 13,668 5025 13,668Lain-lain 2 CuSO4 0 Kg 4,570 0 4570 0

    ZnSO4 0 Kg 2,550 0 2550 0 Dolomit 0 Kg 250 0 250 0o Herbisida 0.125 Lt 30,000 3,750 30000 3,750o Insektisida 0.5 Lt 35,000 17,500 35000 17,500

    Sub Jumlah 72.5 o Rodentisida 3 Kg 14,650 43,950 14650 43,950o Titi Panen 1.2 Unit 120,000 144,000 120000 144,000o Alat Bantu 1 Ls 5,000 5,000 5000 5,000o Transportasi 1 Ls 37,750 37,750 58984.375 58,984Sub Jumlah 938,138 918,572Upaho Tanaga Harian 72.5 HK 18,000 1,305,000 18000 1,305,000o Mandor 3 HK 21,600 64,800 21600 64,800Sub Jumlah 1,369,800 1,369,800Lain-laino Sisip Kelapa Sawit 5 % 1,220,000 61,000 1,216,000 60,800Sub Jumlah 61,000 60,800Pemeliharaan Jalan 1 Ls 226,000 226,000 226,000 226,000Jumlah 2,594,938 2,575,172

    Jumlah Dibulatkan 2,595,000 2,575,000

    LAMPIRAN V.5

    < MENU PERKIRAAN BIAYA PEMELIHARAAN TBM-2 PER HEKTAR0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    Pemupukan 7 Peralatan, Bahan dllPiringan Manual 24 o PupukGawangan Manual 16 Urea 204 Kg 1,450 295,800 1150 234,600Dongkel Anak Kayu 4 RP 136 Kg 900 122,400 900 122,400Kontrol Lalang 9 MOP 238 Kg 1,800 428,400 1800 428,400Konsolidasi (Pembumbunan) 6 Kieserite 204 Kg 1,400 285,600 1400 285,600Pemeliharaan Parit 3 Borat 10.88 Kg 5,025 54,672 5025 54,672Pemangkasan & Kastrasi 6 CuSO4 0 Kg 4,570 0 4570 0Lain-lain 2 ZnSO4 0 Kg 2,550 0 2550 0

    Dolomit 0 Kg 250 0 250 0o Herbisida 0.125 Lt 30,000 3,750 30000 3,750

    Sub Jumlah 77 o Insektisida 0.5 Lt 35,000 17,500 35000 17,500

    INTI PLASMAPEKERJAAN HK URIAN VOLUME

  • o Rodentisida 3 Kg 14,650 43,950 14650 43,950o Alat Bantu 1 Ls 5,000 5,000 5000 5,000o Transportasi 1 Ls 40,000 40,000 62500 62,500Sub Jumlah 1,297,072 1,258,372Upaho Tanaga Harian 77 HK 18,000 1,386,000 18000 1,386,000o Mandor 3 HK 21,600 64,800 21600 64,800Sub Jumlah 1,450,800 1,450,800Pemeliharaan Jalan 1 Ls 226,000 226,000 226,000 226,000Jumlah 2,973,872 2,935,172

    Jumlah Dibulatkan 2,974,000 2,935,000

    LAMPIRAN V.6

    < MENU PERKIRAAN BIAYA PEMELIHARAAN TBM-3 PER HEKTAR0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    Pemupukan 8 Peralatan, Bahan dllPiringan Manual 20 o PupukGawangan Manual 16 Urea 204 Kg 1,450 295,800 1150 234,600Dongkel Anak Kayu 4 RP 136 Kg 900 122,400 900 122,400Kontrol Lalang 6 MOP 238 Kg 1,800 428,400 1800 428,400Konsolidasi (Pembumbunan) 6 Kieserite 204 Kg 1,400 285,600 1400 285,600Pemeliharaan Parit 3 Borat 0 Kg 5,025 0 5025 0Pemangkasan & Kastrasi 4 CuSO4 0 Kg 4,570 0 4570 0Pembuatan TPH 2 ZnSO4 0 Kg 2,550 0 2550 0Lain-lain 4 Dolomit 0 Kg 250 0 250 0

    o Herbisida 0.125 Lt 30,000 3,750 30000 3,750Sub Jumlah 73 o Insektisida 0.5 Lt 35,000 17,500 35000 17,500

    o Rodentisida 3 Kg 14,650 43,950 14650 43,950o Alat Bantu 1 Ls 5,000 5,000 5000 5,000o Transportasi 1 Ls 37,500 37,500 58593.75 58,594Sub Jumlah 1,239,900 1,199,794Upaho Tanaga Harian 73 HK 18,000 1,314,000 18000 1,314,000o Mandor 2 HK 21,600 43,200 21600 43,200Sub Jumlah 1,357,200 1,357,200Jumlah 2,597,100 2,556,994

    Jumlah Dibulatkan 2,597,000 2,557,000

    LAMPIRAN V.7

    < MENU PERKIRAAN BIAYA PEMELIHARAAN TM-1 DAN TM-2 PER HEKTAR

    INTI PLASMAPEKERJAAN HK URIAN VOLUME

  • 0(Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    Pemeliharaan Parit 3 Peralatan, Bahan dllKonsolidasi (Pembumbunan) 6 o PupukCircles & Path Manual 6 Urea 408.0 Kg 1,450 591,600 1150 469,200Circles & Path Chemical 4 RP 204.0 Kg 900 183,600 900 183,600Rawat LCC 0 MOP 340.0 Kg 1,800 612,000 1800 612,000Pemupukan 6 Kieserite 136.0 Kg 1,400 190,400 1400 190,400Sensus Produksi 1 Borat 13.6 Kg 5,025 68,340 5025 68,340Deteksi & Pengendalian HPT 2 CuSO4 - Kg 4,570 0 4570 0Rawat TPH 0.5 ZnSO4 - Kg 2,550 0 2550 0Pruning Kastrasi 3 Dolomit - Kg 250 0 250 0LSU 0.5 o Herbisida 0.125 Liter 30,000 3,750 30000 3,750Lain-lain 2 o Pestisida 0.25 Liter 35,000 8,750 35000 8,750

    o Rodentisida 0.5 Kg 14,650 7,325 14650 7,325Sub Jumlah 34 o Alat Bantu 1 Ls 10,000 10,000 10000 10,000

    o Transportasi 1 Ls 18,000 18,000 28125 28,125Sub Jumlah 1,693,765 1,581,490 Upaho Tanaga Harian 34 HK 18,000 612,000 18000 612,000o Mandor 2 HK 21,600 43,200 21600 43,200Sub Jumlah 655,200 655,200 Pemeliharaan Jalan 226,000 226,000 Jumlah 2,574,965 2,462,690

    Jumlah Dibulatkan 2,575,000 2,463,000

    LAMPIRAN V.8

    < MENU PERKIRAAN BIAYA PEMELIHARAAN TM-3 S/D TM-9 PER HEKTAR0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    Pemeliharaan Parit 3 Peralatan, Bahan dllKonsolidasi (Pembumbunan) 6 o PupukCircles & Path Manual 7 Urea 442.0 Kg 1,450 640,900 1150 508,300Circles & Path Chemical 4 RP 204.0 Kg 900 183,600 900 183,600Rawat LCC 0 MOP 408.0 Kg 1,800 734,400 1800 734,400Pemupukan 6 Kieserite 204.0 Kg 1,400 285,600 1400 285,600Sensus Produksi 1 Borat 0.0 Kg 5,025 0 5025 0

    PEKERJAAN HK

    PEKERJAAN HK URIAN VOLUMEINTI PLASMA

    URIAN VOLUMEINTI PLASMA

  • Deteksi & Pengendalian HPT 2 CuSO4 0.0 Kg 4,570 0 4570 0Rawat TPH 0.5 ZnSO4 0.0 Kg 2,550 0 2550 0Pruning Kastrasi 5 Dolomit 0.0 Kg 250 0 250 0LSU 0.5 o Herbisida 0.125 Liter 30,000 3,750 30000 3,750Lain-lain 2 o Pestisida 0.25 Liter 35,000 8,750 35000 8,750

    o Rodentisida 1 Kg 14,650 14,650 14650 14,650Sub Jumlah 37 o Alat Bantu 1 Ls 10,000 10,000 10000 10,000

    o Transportasi 1 Ls 19,500 19,500 30468.75 30,469Sub Jumlah 1,901,150 1,779,519Upaho Tanaga Harian 37 HK 18,000 666,000 18000 666,000o Mandor 2 HK 21,600 43,200 21600 43,200Sub Jumlah 709,200 709,200 Pemeliharaan Jalan 226,000 226,000 Jumlah 2,836,350 2,714,719

    Jumlah Dibulatkan 2,836,000 2,715,000

    LAMPIRAN V.9

    < MENU PERKIRAAN BIAYA PEMELIHARAAN TM-10 S/D TM-22 PER HEKTAR0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    Pemeliharaan Parit 3 Peralatan, Bahan dllKonsolidasi (Pembumbunan) 6 o PupukCircles & Path Manual 6 Urea 408.0 Kg 1,450 591,600 1150 469,200Circles & Path Chemical 4 RP 136.0 Kg 900 122,400 900 122,400Rawat LCC 0 MOP 408.0 Kg 1,800 734,400 1800 734,400Pemupukan 6 Kieserite 408.0 Kg 1,400 571,200 1400 571,200Sensus Produksi 1 Borat 0.0 Kg 5,025 0 5025 0Deteksi & Pengendalian HPT 2 CuSO4 0.0 Kg 4,570 0 4570 0Rawat TPH 0.5 ZnSO4 0.0 Kg 2,550 0 2550 0Pruning Kastrasi 6 Dolomit 0.0 Kg 250 0 250 0LSU 0.5 o Herbisida 0.125 Liter 30,000 3,750 30000 3,750Lain-lain 2 o Pestisida 0.25 Liter 35,000 8,750 35000 8,750

    o Rodentisida 1 Kg 14,650 14,650 14650 14,650Sub Jumlah 37 o Alat Bantu 1 Kg 10,000 10,000 10000 10,000

    o Transportasi 1 Ls 19,500 19,500 30468.75 30,469Sub Jumlah 2,076,250 1,964,819Upaho Tanaga Harian 37 HK 18,000 666,000 18000 666,000o Mandor 2 HK 21,600 43,200 21600 43,200Sub Jumlah 709,200 709,200 Pemeliharaan Jalan 226,000 226,000

    INTI PLASMAPEKERJAAN HK URIAN VOLUME

  • Jumlah 3,011,450 2,900,019

    Jumlah Dibulatkan 3,011,000 2,900,000

    LAMPIRAN V.10

    < MENU PERKIRAAN BIAYA PEMBUATAN JALAN PER KILOMETER0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    JALAN UTAMA / PRODUKSIPengupasan & Pembersihan 7.5 Peralatan, Bahan dllDaerah Milik Jalan, ROW 9 m o Dozer 36 JK 300,000 10,800,000 300000 10,800,000Membentuk Badan Jalan o Grader 5 JK 200,000 1,000,000 200000 1,000,000(Galian dengan Excavator) o Vibrator Roller 10 JK 175,000 1,750,000 175000 1,750,000Pembuatan Parit Samping o Laterit 144 M3 43,750 6,300,000 43750 6,300,000Penyiapan Tanah Dasar (5 m) 20.0 o Alat Bantu 1 Ls 50,000 50,000 50000 50,000(Pembentukan dengan Grader, Sub Jumlah 19,900,000 19,900,000dan dipadatkan dengan UpahVibrator Roller) o Tanaga Harian 30 HK 18,000 540,000 18000 540,000Membentuk Badan Jalan 62.5 o Mandor 2 HK 21,600 43,200 21600 43,200dengan Timbunan Sub Jumlah 583,200 583,200(Material dihampar dan Dipadatkan) Jumlah 20,483,200 20,483,200

    Jumlah Dibulatkan 20,483,000 20,483,000Sub Jumlah 60.0 JALAN KOLEKSIPengupasan & Pembersihan 5.0 Peralatan, Bahan dllDaerah Milik Jalan, ROW 7 m o Dozer 24 JK 250,000 6,000,000 250000 6,000,000Membentuk Badan Jalan o Grader 3.3 JK 200,000 660,000 200000 660,000(Galian dengan Excavator) o Vibrator Roller 6.7 JK 175,000 1,172,500 175000 1,172,500Pembuatan Parit Samping o Laterit 96 M3 43,750 4,200,000 43750 4,200,000Penyiapan Tanah Dasar (5 m) o Alat Bantu 1 Ls 50,000 50,000 50000 50,000(Pembentukan dengan Grader, Sub Jumlah 12,082,500 12,082,500dan dipadatkan dengan 16.0 UpahVibrator Roller) o Tanaga Harian 20 HK 18,000 360,000 18000 360,000Membentuk Badan Jalan o Mandor 1 HK 21,600 21,600 21600 21,600dengan Timbunan 50.0 Sub Jumlah 381,600 381,600(Material dihampar dan Dipadatkan) Jumlah 12,464,100 12,464,100

    Jumlah Dibulatkan 12,464,000 12,464,000Sub Jumlah 6.0 LAMPIRAN V.11

    < MENU PERKIRAAN BIAYA PENINGKATAN JALAN PER KILOMETERPROYEKSI BIAYA PEMELIHARAAN TANAMAN MENGHASILKAN - INTI

    (Rupiah)

    INTI PLASMA

    INTI PLASMA

    PEKERJAAN HK URIAN VOLUME

  • HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    JALAN UTAMA / PRODUKSIPenyiapan Tanah Dasar 2 Peralatan, Bahan dllPerkerasan Jalan 5 o Grader 5 JK 200,000 1,000,000 200000 1,000,000(Material dihampar, disiram o Vibrator Roller 10 JK 175,000 1,750,000 175000 1,750,000dan dipadatkan minimum o Laterit 180 M3 43,750 7,875,000 43750 7,875,0008 kali lintasan) o Alat Bantu 1 Ls 25,000 25,000 25000 25,000

    Sub Jumlah 10,650,000 10,650,000Sub Jumlah 40 Upah

    o Tanaga Harian 20 HK 18,000 360,000 18000 360,000o Mandor 1 HK 21,600 21,600 21600 21,600Sub Jumlah 381,600 381,600Jumlah 11,031,600 11,031,600Jumlah Dibulatkan 11,032,000 11,032,000

    JALAN KOLEKSIPenyiapan Tanah Dasar 2 Peralatan, Bahan dllPerkerasan Jalan 5 o Grader 3.3 JK 200,000 666,667 200000 666,667(Material dihampar, disiram o Vibrator Roller 3 JK 175,000 525,000 175000 525,000dan dipadatkan minimum o Laterit 120 M3 43,750 5,250,000 43750 5,250,0008 kali lintasan) o Alat Bantu 1 Ls 25,000 25,000 25000 25,000

    Sub Jumlah 6,466,667 6,466,667Sub Jumlah 6 Upah

    o Tanaga Harian 13 HK 18,000 234,000 18000 234,000o Mandor 1 HK 21,600 21,600 21600 21,600Sub Jumlah 241,400 255,600Jumlah 6,708,067 6,722,267Jumlah Dibulatkan 6,708,000 6,722,000

    LAMPIRAN V.12

    < MENU PERKIRAAN BIAYA PEMELIHARAAN JALAN PER KILOMETER; PER HEKTAR0

    (Rupiah)

    HARGA SATUAN

    JUMLAH BIAYA

    HARGA SATUAN

    JUMLAH BIAYA

    JALAN UTAMA / PRODUKSIPenyiapan Tanah Dasar 1 Peralatan, Bahan dllPerkerasan Jalan 2 o Grader 5 JK 200,000 1,000,000 200000 1,000,000

    o Vibrator Roller 10 JK 175,000 1,750,000 175000 1,750,000Sub Jumlah 6 o Laterit 60 M3 43,750 2,625,000 43750 2,625,000

    o Alat Bantu 1 Ls 5,000 5,000 5000 5,000Sub Jumlah 5,380,000 5,380,000Upaho Tanaga Harian 20 HK 18,000 360,000 18000 360,000

    PEKERJAAN HK URIAN VOLUMEINTI PLASMA

    URIAN VOLUMEPEKERJAAN HK

  • o Mandor 1 HK 21,600 21,600 21600 21,600Sub Jumlah 381,600 381,600Jumlah 5,761,600 5,761,600Jalan Produksi per Hektar 12.0 M 5,762 69,139 5,762 69,139Dibulatkan 69,000 69,000

    JALAN KOLEKSIPenyiapan Tanah Dasar 1 Peralatan, Bahan dllPerkerasan Jalan 2 o Grader 5.0 JK 200,000 1,000,000 200000 1,000,000

    o Vibrator Roller 10.0 JK 175,000 1,750,000 175000 1,750,000Sub Jumlah 6 o Laterit 40 M3 43,750 1,750,000 43750 1,750,000

    o Alat Bantu 1 Ls 5,000 5,000 5000 5,000Sub Jumlah 4,505,000 4,505,000Upaho Tanaga Harian 13 HK 18,000 234,000 18000 234,000o Mandor 1 HK 21,600 21,600 21600 21,600Sub Jumlah 255,600 255,600Jumlah 4,760,600 4,760,600Jalan Koleksi per Hektar 33.0 M 4,761 157,100 4,761 157,100Dibulatkan 157,000 157,000

  • 00000

    0000

    00

    3515.6253515.625

    000

    3515.625

    0703.125703.125

    1000

  • 000

    -206250000

    -206250

    000

    -206250

    0-1655500

    000

    14062.5-1641437.5

  • 000

    -1641437.5

    703.12500000

    703.1250

    0.0614628.7890625

    0

    0000000

    00

    0

    0

  • 0-142800000000000

    10687.5-3592.5

    000

    -3592.5

    -4000

  • -40800000000000000

    21234.375-19565.625

    000

    -200-200

    0-19765.625

    -20000

    -61200000000000

  • 00

    22500-38700

    0000

    -38700

    -39000

    -6120000000000000

    21093.75-40106.25

    000

    -40106.25

    -40000

  • -12240000000000000

    10125-112275

    0000

    -112275

    -112000

    -1326000000

  • 0000000

    10968.75-121631.25

    0000

    -121631.25

    -121000

    -12240000000000000

    10968.75-111431.25

    0000

  • -111431.25

    -111000

    000000

    00000

    0000000000000

  • 00000

    0

  • 00000

    00000

    000000