perancangan program operasional sdm dan organisasi pt pln ... · pdf filedivisi permesinan...

23
DAFTAR PUSTAKA Ananto, Dedy, 1997, Perancangan Ulang Sistem Penerapan Total Productive Maintenance, Bandung, Institut Teknologi Bandung. Bisnis Indonesia, 2005, Pindad Kewalahan Penuhi Permintaan Dalam Negeri, 7 Juli, Dikutip 25 Februari 2008 dari http:// www.bppt.co.id / halamandepan /indexberita/tekindustrihankam. Cato W. William, Mobley Keith R., 2001, Computer-Managed Maintenance Systems: A Step-by-Step Guide to Effective Management of Maintenance, Labor, and Inventory, Elsevier Science & Technology Books. Gertsbakh, I.B., 1977, Models of Preventive Maintenance, Amsterdam, North-Holland Publishing. Jardine, A.K.S., 1973, Maintenance, Replacement and Reliability, London, Pitman Publishing. LKBN Antara, 2007, PT Pindad Tak Keberatan Pembelian Tanpa Pihak Ketiga, Dikutip 18 April 2007 dari http://www.antara.co.id/arc/2007/4/18. Miller, Erwin & Freud E. John, 1977, Probability and Statistical for Engineers, New Delhi, Prentice-Hall. Departemen Pemeliharaan Mesin PT. Pindad, 2007, Profil Departemen Pemeliharaan Mesin PT. Pindad, dokumen yang tidak dipublikasikan. Divisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan. Govil, A.K., 1983, Reliability Engineering, New Delhi, Tata McGraw-Hill. Hawkins Bruce, Kister Timothy C., 2006, Maintenance Planning and Scheduling : Streamline Your Organization for a Lean Environment, London, Butterworth Heinmann. Hermasari, Emma, 2007, Audit Budaya Divisi Permesinan dan Jasa PT. Pindad, Bandung, Institut Teknologi Bandung.

Upload: tranthu

Post on 04-Feb-2018

229 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

DAFTAR PUSTAKA 

 

 

Ananto, Dedy, 1997, Perancangan Ulang Sistem Penerapan Total Productive

Maintenance, Bandung, Institut Teknologi Bandung.

Bisnis Indonesia, 2005, Pindad Kewalahan Penuhi Permintaan Dalam Negeri, 7 Juli,

Dikutip 25 Februari 2008 dari

http://www.bppt.co.id/halamandepan/indexberita/tekindustrihankam.

Cato W. William, Mobley Keith R., 2001, Computer-Managed Maintenance Systems: A

Step-by-Step Guide to Effective Management of Maintenance, Labor, and

Inventory, Elsevier Science & Technology Books.

Gertsbakh, I.B., 1977, Models of Preventive Maintenance, Amsterdam, North-Holland

Publishing.

Jardine, A.K.S., 1973, Maintenance, Replacement and Reliability, London, Pitman

Publishing.

LKBN Antara, 2007, PT Pindad Tak Keberatan Pembelian Tanpa Pihak Ketiga, Dikutip

18 April 2007 dari

http://www.antara.co.id/arc/2007/4/18.

Miller, Erwin & Freud E. John, 1977, Probability and Statistical for Engineers, New

Delhi, Prentice-Hall.

Departemen Pemeliharaan Mesin PT. Pindad, 2007, Profil Departemen Pemeliharaan

Mesin PT. Pindad, dokumen yang tidak dipublikasikan.

Divisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT.

Pindad, dokumen yang tidak dipublikasikan.

Govil, A.K., 1983, Reliability Engineering, New Delhi, Tata McGraw-Hill.

Hawkins Bruce, Kister Timothy C., 2006, Maintenance Planning and Scheduling :

Streamline Your Organization for a Lean Environment, London, Butterworth

Heinmann.

Hermasari, Emma, 2007, Audit Budaya Divisi Permesinan dan Jasa PT. Pindad,

Bandung, Institut Teknologi Bandung.

Page 2: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

Hidayat S.M. Indra, Mahardika Pradono, 2005, Identifikasi KPI Untuk Meningkatkan

Kinerja Perusahaan Dengan BSC di PT. Pindad, Bandung, Institut Teknologi

Bandung.

Nakajima, Seichi, 1988, Introduction to TPM, Massachusetts, Productivity Press.

PT. Pindad, 2007, Brosur PT. Pindad, Bandung.

PT Pindad, 2007, Profil Perusahaan, Dikutip April 2007 dari http://www.bumn-

ri.com/pindad.

Willmott Peter, McCharty Dennis, 2001, TPM A-Route to World Class Perfomance,

London, Butterworth Heinmann.

        

Page 3: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

LAMPIRAN A Data Kegiatan Perawatan Mesin CNC Sincom E 32 K 

Page 4: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

Data Kerusakan Mesin 1 CNC Sincom E 32 K Tahun 2004

tgl Rusak jam rusak Jenis Tgl Serah Jam Serah Tgl Start Jam Start Tgl Finish Jam Finish Tgl diterima Jam diterima

11/01/04 8.00 BM 11/01/04 8.00 11/01/04 8.00 11/01/04 9.30 11/01/04 9.30

13/01/04 8.00 BM 13/01/04 8.00 13/01/04 8.30 13/01/04 9.00 13/01/04 9.00

08/03/04 14.00 BM 08/03/04 14.00 10/03/04 14.00 16.00 15/03/04 16.00

27/03/04 21.00 BM 27/03/04 8.00 27/03/04 8.00 27/03/04 12.00 27/03/04 12.00

03/04/04 8.00 CM 03/04/04 9.00 03/04/04 9.00 03/04/04 15.15 03/04/04 16.15

06/04/04 13.25 CM 06/04/04 13.45 06/04/04 14.00 06/04/04 15.30 06/04/04 15.30

21/04/04 15.00 BM 21/04/04 15.00 21/04/04 15.00 21/04/04 15.20 21/04/04 15.20

06/05/04 8.00 BM 08/05/04 8.00 08/05/04 8.00 15.00 15/05/04 16.00

17/05/04 9.00 BM 17/05/04 9.00 17/05/04 9.00 17/05/04 9.45 17/05/04 9.45

21/05/04 9.00 BM 21/05/04 9.00 21/05/04 9.00 9.30 23/05/04 9.30

27/05/04 13.30 BM 27/05/04 13.30 27/05/04 8.00 27/05/04 9.00 27/05/04 9.00

29/05/04 8.00 BM 29/05/04 8.00 29/05/04 8.00 29/05/04 10.25 29/05/04 10.25

24/07/04 8.00 BM 24/07/04 8.00 24/07/04 8.00 24/07/04 10.00 24/07/04 10.00

14/08/04 8.00 BM 15/08/04 8.00 15/08/04 8.00 9.30 16/08/04 9.30

23/08/04 10.00 BM 23/08/04 10.00 24/08/04 10.00 24/08/04 11.00 24/08/04 11.00

04/09/04 8.00 CM 05/09/04 8.00 05/09/04 8.00 05/09/04 9.00 05/09/04 9.00

11/09/04 8.00 BM 11/09/04 8.00 8.00 15..00 11/09/04 16.00

01/10/04 9.15 BM 01/10/04 9.30 02/10/04 9.30 02/10/04 10.00 02/10/04 10.00

04/10/04 7.45 PM 04/10/04 7.45 04/10/04 7.45 9.00 31/10/04 9.00

01/11/04 14.30 BM 01/11/04 14.30 01/11/04 14.30 01/11/04 15.30 01/11/04 15.30

11/11/04 7.45 PM 11/11/04 7.45 11/11/04 7.45 11/11/04 16.30

18/11/04 7.45 BM 18/11/04 7.45 18/11/04 7.45 20/11/04 14.00

08/12/04 8.00 BM 08/12/04 8.00 08/12/04 8.00 08/12/04 12.00 08/12/04 12.00

Page 5: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

Data Kerusakan Mesin 1 CNC Sincom E 32 K Tahun 2005

tgl Rusak jam rusak Jenis Tgl Serah Jam Serah Tgl Start Jam Start Tgl Finish Jam Finish Tgl diterima Jam diterima

12/01/05 8.30 CM 12/01/05 8.30 12/01/05 8.30 12/01/05 9.00 12/01/05 12.00

06/02/05 8.30 BM 06/02/05 8.30 06/02/04 13.00 06/02/05 16.00 06/02/05 12.00

08/02/05 8.30 BM 08/02/05 8.30 08/02/04 8.00 08/02/05 15.30 08/02/05 12.00

11/02/05 8.30 BM 12/02/05 8.30 12/02/04 8.00 12/02/05 15.30 12/02/05 12.00

17/02/05 13.00 BM 17/02/05 13.00 17/02/04 13.00 17/02/05 14.00 17/02/05 14.00

29/03/05 9.15 BM 29/03/05 9.15 29/03/04 9.15 29/03/05 9.30 29/03/05 9.30

30/03/05 8.00 CM 30/03/05 8.00 30/03/04 8.00 30/03/05 15.00 30/03/05 16.00

02/04/05 15.45 PM 02/04/05 16.00 02/04/04 8.00 02/04/05 9.00 02/04/05 9.00

14/04/05 8.00 CM 14/04/05 8.00 14/04/04 8.00 14/04/05 8.30 14/04/05 8.30

18/04/05 8.00 bm 18/04/05 8.00 18/04/04 13.00 18/04/05 14.00 18/04/05 14.00

20/04/05 8.00 CM 20/04/05 8.00 21/04/04 8.00 21/04/05 8.30 21/04/05 8.30

27/04/05 8.00 BM 27/04/05 8.00 27/04/04 8.00 27/04/05 15.00 27/04/05 16.00

13/05/05 14.00 BM 13/05/05 14.15 13/05/04 15.00 13/05/05 16.30 13/05/05 16.30

17/05/05 8.00 BM 17/05/05 8.00 17/05/04 8.00 17/05/05 15.15 17/05/05 16.15

23/05/05 21.30 BM 23/05/05 8.00 23/05/04 8.00 23/05/05 9.00 23/05/05 9.00

27/05/05 8.20 BM 27/05/05 8.30 27/05/04 9.00 27/05/05 12.00 27/05/05 12.00

04/06/05 22.30 BM 04/06/05 8.00 04/06/04 8.00 04/06/05 12.30 04/06/05 12.30

16/06/05 7.35 BM 16/06/05 7.35 16/06/04 7.35 16/06/05 9.00 16/06/05 9.00

08/08/05 10.00 BM 08/08/05 10.00 08/08/04 10.00 08/08/05 12.00 08/08/05 12.00

12/09/05 00.00 BM 12/09/05 7.30 12/09/04 7.30 12/09/05 15.30 12/09/05 15.30

20/09/05 8.00 PM 20/09/05 8.00 20/09/04 8.00 9.00 30/09/05 9.00

03/10/05 18.00 PM 03/10/05 8.00 03/10/04 8.00 12.00 04/10/05 12.00

18/10/05 13.30 BM 18/10/05 13.30 18/10/04 13.30 18/10/05 13.45 18/10/05 13.45

21/10/05 15.30 BM 21/10/05 15.30 21/10/04 15.30 21/10/05 14.15 21/10/05 16.45

24/10/05 13.30 BM 24/10/05 13.30 24/10/04 13.30 25/10/05 10.00

18/11/05 8.30 BM 18/11/05 8.00 18/11/04 8.00 18/11/05 10.10 18/11/05 16.00

30/11/05 1.30 CM 30/11/05 8.00 30/11/04 8.00 30/11/05 9.00 30/11/05 9.00

15/12/05 8.00 BM 15/12/04 8 15/12/04 8 15/12/05 8.25 15/12/05 8.25

Page 6: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

Data Kerusakan Mesin 1 CNC Sincom E 32 K Tahun 2006

tgl Rusak jam rusak Jenis Tgl Serah Jam Serah Tgl Start Jam Start Tgl Finish Jam Finish Tgl diterima Jam diterima

04/01/06 7.30 CM 04/01/06 7.30 04/01/06 7.30 04/01/06 9.30 04/01/06 9.30

04/01/06 8.00 CM 04/01/06 8.00 22/01/04 8.00 22/01/06 11.00 30/01/06 11.00

04/01/06 14.00 CM 04/01/06 14.15 25/01/04 8.00 25/01/06 30/01/06 16.30

04/01/06 7.40 CM 04/01/06 7.40 26/01/04 7.40 26/01/06 15.45 30/01/06 16.45

17/01/06 7.30 BM 17/01/06 7.30 17/01/04 7.30 17/01/06 8.30 17/01/06 8.30

19/01/06 1.30 BM 19/01/06 9.00 19/01/04 9.30 19/01/06 12.00 19/01/06 12.00

06/02/06 14.30 BM 06/02/06 14.30 06/02/04 14.30 06/02/06 15.45 06/02/06 15.45

20/02/06 14.15 BM 20/02/06 8.00 20/02/04 8.00 21/02/06 21/02/06 16.30

10/03/06 00.00 BM 10/03/06 7.30 10/03/04 7.45 10/03/06 11.35 10/03/06 11.35

26/03/06 7.30 BM 26/03/06 7.45 26/03/04 8.00 26/03/06 26/03/06 16.45

02/04/06 10.00 CM 02/04/06 10.00 02/04/04 10.00 02/04/06 10.30 02/04/06 10.30

11/04/06 9.30 BM 11/04/06 9.30 11/04/04 9.30 11/04/06 10.00 11/04/06 10.00

19/04/06 7.45 BM 19/04/06 8.00 19/04/04 8.00 19/04/06 8.05 19/04/06 8.05

13/06/06 3.00 PM 13/06/06 7.15 13/06/04 7.30 13/06/06 26/06/06 12.00

24/06/06 16.00 BM 25/06/06 16.15 25/06/04 8.00 25/06/06 12.00 25/06/06 12.00

20/07/06 13.30 BM 20/07/06 13.30 20/07/04 15.00 20/07/06 16.15 20/07/06 16.15

02/08/06 8.00 BM 03/08/06 8.00 03/08/04 04/08/06 04/08/06 15.15

09/08/06 0 CM 09/08/06 0 09/08/04 8.00 09/08/06 15.30 09/08/06 16.30

23/08/06 8.00 BM 23/08/06 8.00 23/08/04 8.00 23/08/06 23/08/06 14.00

29/09/06 0 CM 30/09/06 0 30/09/04 7,45 30/09/06 15.30 30/09/06 16.30

02/10/06 7.45 BM 02/10/06 7.45 02/10/04 7.45 02/10/06 02/10/06 16.00

05/10/06 9.00 CM 06/10/06 9.00 06/10/04 9.00 06/10/06 06/10/06 13.30

07/10/06 14.30 BM 07/10/06 14.30 07/10/04 14.30 07/10/06 16.45 07/10/06 16.45

18/10/06 15.30 BM 18/10/06 15.30 18/10/04 15.30 24/10/06 16.45

04/11/06 13.30 PM 04/11/06 13.30 04/11/04 13.30 14/11/06 10.00

10/12/06 8.30 BM 12/12/06 8.00 12/12/04 8.00 13/12/06 16.00

Page 7: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

Data Kerusakan Mesin 2 CNC Sincom E 32 K Tahun 2004

tgl Rusak jam rusak Jenis Tgl Serah Jam Serah Tgl Start Jam Start Tgl Finish Jam Finish Tgl diterima Jam diterima

20/01/04 8.00 BM 21/01/04 8.00 21/01/04 8.00 21/01/04 8.10 21/01/04 8.10

25/02/04 8.00 BM 25/02/04 8.00 25/02/04 8.00 25/02/04 12.00 25/02/04 12.00

30/03/04 10.00 cmwo 30/03/04 10.00 30/03/04 10.00 30/03/04 11.00 30/03/04 11.00

01/07/04 10.30 BM 01/07/04 10.30 01/07/04 10.30 01/07/04 12.00 01/07/04 12.00

05/07/04 16.00 BM 05/07/04 8.00 05/07/04 8.00 05/07/04 15.30 05/07/04 16.30

23/07/04 9.40 BM 23/07/04 9.40 23/07/04 9.40 23/07/04 10.15 23/07/04 10.15

26/07/04 8.00 BM 26/07/04 8.00 26/07/04 8.00 26/07/04 26/07/04 16.30

07/08/04 8.00 BM 07/08/04 8.00 07/08/04 8.00 07/08/04 15.30 07/08/04 15.30

09/08/04 14.30 BM 11/08/04 14.30 11/08/04 14.30 11/08/04 16.00 11/08/04 16.00

18/08/04 3.00 BM 18/08/04 8.00 19/08/04 8.00 8.30 27/08/04 8.30

28/08/04 8.00 cmwo 28/08/04 8.00 28/08/04 8.00 28/08/04 28/08/04 16.30

30/08/04 2.30 BM 30/08/04 8.00 30/08/04 8.00 30/08/04 15.30 30/08/04 16.30

01/08/04 8.00 BM 01/08/04 8.00 01/08/04 8.00 01/08/04 01/08/04 16.35

15/09/04 8.00 BM 15/09/04 8.00 15/09/04 8.00 15/09/04 15/09/04 16.35

21/09/04 8.00 BM 22/09/04 8.00 22/09/04 8.00 22/09/04 14.00 22/09/04 15.00

30/09/04 8.00 BM 30/09/04 8.00 30/09/04 8.00 30/09/04 9.30 30/09/04 9.30

06/10/04 7.30 BM 06/10/04 8.00 06/10/04 8.00 06/10/04 9.45 06/10/04 9.45

22/10/04 8.00 BM 22/10/04 8.00 22/10/04 8.00 22/10/04 8.45 22/10/04 8.45

27/10/04 8.00 PM 27/10/04 8.00 27/10/04 8.00 29/10/04 16.00

04/11/04 7.30 BM 04/11/04 7.30 04/11/04 7.30 04/11/04 8.00 04/11/04 8.00

05/11/04 8.00 BM 05/11/04 8.00 05/11/04 8.00 05/11/04 11.00 05/11/04 11.00

11/11/04 9.00 BM 11/11/04 9.30 11/11/04 13.00 11/11/04 14.00 11/11/04 14.00

03/12/04 21.45 BM 04/12/04 8.00 04/12/04 8.00 04/12/04 8.45 04/12/04 8.45

08/12/04 10.00 BM 08/12/04 10.00 08/12/04 10.00 13/12/04 12.00

Page 8: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

Data Kerusakan Mesin 2 CNC Sincom E 32 K Tahun 2005

tgl Rusak jam rusak Jenis Tgl Serah Jam Serah Tgl Start Jam Start Tgl Finish Jam Finish Tgl diterima Jam diterima

17/01/05 8.00 BM 17/01/05 8.00 17/01/05 8.00 17/01/05 14.00 17/01/05 15.00

26/01/05 8.00 BM 27/01/05 8.00 27/01/05 8.00 27/01/05 9.30 27/01/05 9.30

17/02/05 7.30 BM 17/02/05 8.00 20/02/05 8.00 20/02/05 9.45 20/02/05 9.45

09/03/05 8.00 BM 09/03/05 8.00 09/03/05 8.00 09/03/05 8.45 09/03/05 8.45

24/03/05 8.00 CM 24/03/05 8.00 24/03/05 8.00 24/03/05 24/03/05 16.00

27/03/05 7.30 PM 27/03/05 7.30 27/03/05 7.30 8.00 30/03/05 8.00

03/04/05 8.00 BM 03/04/05 8.00 03/04/05 8.00 03/04/05 11.00 03/04/05 11.00

14/04/05 9.00 BM 15/04/05 9.30 15/04/05 13.00 15/04/05 14.00 15/04/05 14.00

26/07/05 21.45 BM 26/07/05 8.00 26/07/05 8.00 26/07/05 8.45 26/07/05 8.45

27/07/05 10.00 BM 27/07/05 10.00 27/07/05 10.00 27/07/05 27/07/05 12.00

14/08/05 10.00 BM 14/08/05 10.00 14/08/05 10.30 14/08/05 12.00 14/08/05 12.00

21/08/08 9.00 BM 21/08/08 9.00 21/08/08 9.00 21/08/08 9.30 21/08/08 9.30

08/09/05 9.30 BM 08/09/05 9.30 08/09/05 9.45 08/09/05 10.30 08/09/05 10.30

16/10/05 9.00 CM 16/10/05 9.00 16/10/05 9.00 17/10/05 12.00

31/10/05 4.30 BM 31/10/05 7.45 31/10/05 8.00 31/10/05 15.00 31/10/05 16.00

06/11/05 8.00 CM 06/11/05 8.00 06/11/05 8.00 06/11/05 12.00 06/11/05 12.00

06/12/05 16.15 BM 06/12/05 16.15 07/12/05 8.00 07/12/05 12.00 07/12/05 12.00

11/12/05 9.00 BM 11/12/05 9.00 11/12/05 9.00 11/12/05 10.00 11/12/05 10.00

12/12/05 10.00 BM 12/12/05 10.00 12/12/05 10.00 12/12/05 12.00 12/12/05 12.00

14/12/05 9.00 BM 14/12/05 9.00 14/12/05 9.00 14/12/05 12.00 14/12/05 12.00

18/12/05 22.00 BM 19/12/05 8.00 19/12/05 8.00 22/12/05 16.15

26/12/05 8.00 BM 26/12/05 8.00 26/12/05 8.00 26/12/05 10.30 26/12/05 10.30

28/12/05 10.00 CM 28/12/05 10.00 28/12/05 10.00 28/12/05 12.30 28/12/05 13.30

Data Kerusakan Mesin 2 CNC Sincom E 32 K Tahun 2006

tgl Rusak jam rusak Jenis Tgl Serah Jam Serah Tgl Start Jam Start Tgl Finish Jam Finish Tgl diterima Jam diterima

23/01/06 17.00 BM 23/01/06 8.00 23/01/06 8.00 23/01/06 9.30 23/01/06 9.30

04/03/06 8.30 BM 04/03/06 8.30 05/03/06 8.30 05/03/06 9.10 05/03/06 9.10

30/03/06 11.00 BM 30/03/06 11.00 30/03/06 11.00 30/03/06 13.00 30/03/06 13.00

25/04/06 8.00 BM 25/04/06 8.30 25/04/06 14.15 25/04/06 16.15 25/04/06 16.15

08/05/06 9.00 CM 09/05/06 9.00 09/05/06 9.00 09/05/06 10.00 09/05/06 10.00

28/05/05 10.40 BM 28/05/05 11.00 28/05/05 14.00 28/05/05 14.30 28/05/05 14.30

12/06/06 9.30 PM 12/06/06 9.30 12/06/06 9.30 10.00 13/06/06 10.00

06/08/06 17.30 BM 06/08/06 17.45 06/08/06 17.45 06/08/06 18.20 06/08/06 18.20

30/08/06 15.30 BM 30/08/06 8.00 30/08/06 16.45 30/08/06 20.00 30/08/06 20.00

20/09/06 10.15 BM 20/09/06 10.30 20/09/06 13.30 20/09/06 20/09/06

09/10/06 12.30 CM 09/10/06 13.00 09/10/06 13.30 15.00 10/10/06 15.00

22/10/06 8.00 BM 22/10/06 8.15 22/10/06 9.00 22/10/06 9.15 22/10/06 9.15

25/11/06 8.40 PM 25/11/06 8.40 25/11/06 9.00 9.15 29/11/06 9.15

01/12/06 7.30 PM 01/12/06 8.00 01/12/06 8.00 03/12/06 16.35

Page 9: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

Data Kerusakan Mesin 3 CNC Sincom E 32 K Tahun 2004

tgl Rusak jam rusak Jenis Tgl Serah Jam Serah Tgl Start Jam Start Tgl Finish Jam Finish Tgl diterima Jam diterima

02/01/04 15.45 PM 02/01/04 16.00 02/01/04 16.00 16.30 04/01/05 16.30

30/01/04 8.15 BM 30/01/05 8.15 30/01/04 8.15 30/01/05 9.00 30/01/05 9.00

13/02/04 11.00 BM 13/02/05 11.00 13/02/04 11.00 13/02/05 11.00 13/02/05 16.45

28/03/04 7.45 CM 28/03/05 7.45 28/03/04 8.00 28/03/05 8.10 28/03/05 8.10

31/03/04 9.30 BM 31/03/05 9.30 31/03/04 9.30 31/03/05 10.00 31/03/05 10.00

30/05/04 14.00 CM 30/05/05 14.00 30/05/04 14.00 30/05/05 14.15 30/05/05 14.15

01/07/04 9.45 BM 01/07/05 10.00 03/07/04 10.00 03/07/05 03/07/05 18.00

10/07/04 20.00 BM 10/07/05 8.00 11/07/04 8.00 15.30 12/07/05 12.00

21/08/04 8.30 BM 21/08/05 8.30 21/08/04 8.30 12.00 30/08/05 12.00

18/11/04 14.15 BM 18/11/05 14.15 18/11/04 14.15 16.00 22/11/05 18.00

09/12/04 13.00 PM 09/12/05 13.00 09/12/04 13.00 15/12/05 11.15

Data Kerusakan Mesin 3 CNC Sincom E 32 K Tahun 2005

tgl Rusak jam rusak Jenis Tgl Serah Jam Serah Tgl Start Jam Start Tgl Finish Jam Finish Tgl diterima Jam diterima

18/05/05 8.15 BM 18/05/05 8.15 18/05/05 8.15 18/05/05 8.30 18/05/05 8.30

27/05/05 7.30 BM 27/05/05 7.30 27/05/05 7.45 27/05/05 8.15 27/05/05 8.15

07/07/05 18.00 BM 07/07/05 8.00 07/07/05 8.00 07/07/05 20/07/05 16.45

25/07/05 7.45 BM 25/07/05 7.45 25/07/05 7.45 25/07/05 25/07/05 16.00

10/08/05 0 CM 10/08/05 7.30 10/08/05 7.45 10/08/05 9.00 10/08/05 9.00

12/09/05 10.15 CM 12/09/05 10.15 12/09/05 10.15 12/09/05 15.15 12/09/05 16.00

19/09/05 8.00 BM 19/09/05 8.00 19/09/05 8.00 8.30 21/09/05 8.30

03/10/05 19.00 BM 04/10/05 8.00 04/10/05 8.15 04/10/05 12.00 05/10/05 12.00

08/11/05 6.00 BM 08/11/05 8.00 08/11/05 8.00 08/11/05 15.15 08/11/05 16.15

11/11/05 8.00 BM 11/11/05 8.00 11/11/05 8.00 11/11/05 11/11/05 16.00

17/11/05 9.00 BM 17/11/05 9.00 17/11/05 9.00 12.00 18/11/05 12.00

24/12/05 15.30 PM 24/12/05 16.00 24/12/05 8.00 11.15 28/12/05 11.15

Page 10: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

Data Kerusakan Mesin 3 CNC Sincom E 32 K Tahun 2006

tgl Rusak jam rusak Jenis Tgl Serah Jam Serah Tgl Start Jam Start Tgl Finish Jam Finish Tgl diterima Jam diterima

08/01/06 8.00 BM 08/01/06 8.00 08/01/06 8.00 08/01/06 08/01/06 16.30

10/01/06 7.30 BM 10/01/06 7.30 10/01/06 7.30 10/01/06 9.00 10/01/06 9.00

12/01/06 7.30 BM 13/01/06 7.30 13/01/06 8.00 9.30 15/01/05 9.30

17/01/06 13.00 PM 17/01/06 13.00 17/01/06 13.00 13.15 21/01/06 13.15

26/01/05 18.10 BM 26/01/05 18.10 26/01/05 18.10 26/01/05 18.15 26/01/05 18.15

01/02/05 8.00 BM 01/02/05 8.00 01/02/05 8.00 01/02/05 9.30 03/02/06 9.30

26/03/06 8.00 BM 26/03/06 8.00 26/03/06 13.00 26/03/06 16.30 26/03/06 16.30

8/0/06 8.00 BM 09/04/06 8.00 09/04/06 8.00 09/04/06 09/04/06 16.00

22/05/06 8.00 CM 22/05/06 8.00 22/05/06 8.00 22/05/06 22/05/06 16.30

29/06/06 8.00 PM 29/06/06 8.00 29/06/06 8.00 30/06/06 16.00

01/07/06 8.00 BM 01/07/06 8.00 01/07/06 8.00 01/07/06 01/07/06 16.30

25/08/06 15.30 CM 25/08/06 16.00 26/08/06 8.00 26/08/06 11.15 26/08/06 11.15

12/09/06 11.00 CM 12/09/06 11.30 13/09/06 13.30 13/09/06 14.00 13/09/06 14.00

13/09/06 8.00 BM 13/09/06 8.00 13/09/06 8.00 13/09/06 11.15 13/09/06 11.15

01/10/06 5.30 BM 01/10/06 8.00 01/10/06 8.00 01/10/06 14.00 02/10/06 14.45

16/10/06 15.00 BM 16/10/06 15.00 16/10/06 15.45 16/10/06 16.45 16/10/06 16.45

06/11/06 8.00 BM 06/11/06 8.00 06/11/06 8.00 06/11/06 14.00 07/11/06 15.00

26/11/06 9.00 CM 26/11/06 9.00 26/11/06 9.00 28/11/06 16.30

11/12/06 13.00 PM 11/12/06 13.00 11/12/06 13.00 24/12/06 16.35

Jenis Kerusakan :

CM : Condition Based Maintenance.

BM : Breakdown Maintenance

PM : Preventive Maintenance

Page 11: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

LAMPIRAN B Penentuan Interval Perawatan Preventif Mesin CNC 

Sincom E 32 K

Page 12: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

Tabel Pengujian Kecocokan Distribusi Weibull Dua Parameter Ms 1 tahun 2004

No Ti (Jam) Xi =(ln Ti) Xi + 1 - Xi Mi a/Mi 1 44,25 3,789855 1,04245 1,03751 1,00476 2 125,5 4,832306 0,45596 0,54005 0,84428 3 198 5,288267 0,29522 0,37635 0,78445 4 266 5,583496 0,25641 0,29649 0,86482 5 343,75 5,839915 0,01859 0,25065 0,07416 6 350,2 5,858504 0,09213 0,22237 0,41433 7 384 5,950643 0 0,20488 0 8 384 5,950643 0,09968 0,19515 0,51074 9 424,25 6,050323 0,01520 0,19220 0,07910

10 430,75 6,065528 0,13193 0,19667 0,67081 11 491,5 6,197462 0,66736 0,21187 3,14990 12 958 6,864848 0,25882 0,24840 1,04193 13 1241 7,123673 0,42083 0,35333 1,19104 14 1890,33 7,544507

Jumlah 10,63035 S (14, 95%) = 0.67

S hitung = 0625

Tabel Estimasi Parameter Weibull Dua Parameter Ms 1 tahun 2004

i Ti (Jam) F(Ti) Xi Yi Xi,Yi Xi^2 1 44,25 0,048611 -2,99909 3,789855 -11,3661 8,994543 2 125,5 0,118056 -2,07444 4,832306 -10,0243 4,303319 3 198 0,1875 -1,57195 5,288267 -8,3129 2,471035 4 266 0,256944 -1,21408 5,583496 -6,77879 1,473979 5 343,75 0,326389 -0,92861 5,839915 -5,42301 0,862317 6 350,2 0,395833 -0,68537 5,858504 -4,01523 0,469728 7 384 0,465278 -0,46839 5,950643 -2,78724 0,219391 8 384 0,534722 -0,26772 5,950643 -1,59312 0,071675 9 424,25 0,604167 -0,07606 6,050323 -0,46018 0,005785

10 430,75 0,673611 0,11303 6,065528 0,685588 0,012776 11 491,5 0,743056 0,30667 6,197462 1,900589 0,094048 12 958 0,8125 0,51520 6,864848 3,536783 0,265433 13 1241 0,881944 0,75921 7,123673 5,408405 0,576409 14 1890,33 0,951389 1,10654 7,544507 8,348362 1,224449

Jumlah -7,48504 82,93997 -30,8812 21,04489

b = 0.7899 β = 1,26598

a = 6,3466 α = 570,5504

Page 13: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

Tabel Pengujian Kecocokan Distribusi Weibull Dua Parameter Ms 1 tahun 2005

No Ti (Jam) Xi =(ln Ti) Xi + 1 - Xi Mi a/Mi 1 47,5 3,86073 0,01047130 1,02885 0,0101782 48 3,87120 0,76837060 0,53033 1,4488483 103,5 4,63957 0,00481928 0,36531 0,0131924 104 4,64439 0,34263452 0,28384 1,2071145 146,5 4,98702 0,44669657 0,23595 1,8931196 229 5,43372 0,08673841 0,20505 0,4230097 249,75 5,5204 0,36494892 0,18405 1,9828258 359,75 5,88540 0,12830581 0,16950 0,7569499 409 6,01371 0,09107807 0,59564 0,152908

10 448 6,10479 0,00356506 0,15326 0,02326111 449,6 6,10835 0,07682098 0,15017 0,5115412 485,5 6,18517 0,02139663 0,15033 0,14232813 496 6,20657 0,00653104 0,15431 0,04232314 499,25 6,21310 0,19525706 0,16363 1,19328415 606,9 6,40836 0,20233201 0,18197 1,11189216 743 6,61070 0,57922612 0,21982 2,63494217 1326 7,18992 0,01218041 0,32258 0,03775918 1342,25 7,20210

Jumlah 13,58547

S (18, 95%) = 0.65

S hitung = 0,419369

Tabel Estimasi Parameter Weibull Dua Parameter Ms 1 tahun 2005

No Ti (Jam) F(Ti) Xi Yi Xi,Yi Xi^2 1 47,5 0,038043 -3,2497 3,86073 -12,5462 10,56052 2 48 0,092391 -2,33364 3,871201 -9,03400 5,44589 3 103,5 0,146739 -1,8408 4,639572 -8,54054 3,388556 4 104 0,201087 -1,49387 4,644391 -6,93810 2,231634 5 146,5 0,255435 -1,22093 4,987025 -6,08882 1,490678 6 229 0,309783 -0,99223 5,433722 -5,39151 0,984522 7 249,75 0,36413 -0,79239 5,52046 -4,37435 0,62788 8 359,75 0,418478 -0,61229 5,885409 -3,60359 0,37490 9 409 0,472826 -0,44594 6,013715 -2,68173 0,198859

10 448 0,527174 -0,28898 6,104793 -1,76416 0,083509 11 449,6 0,581522 -0,13796 6,108358 -0,84273 0,019034 12 485,5 0,63587 0,010191 6,185179 0,063033 0,00010 13 496 0,690217 0,158613 6,206576 0,984444 0,025158 14 499,25 0,744565 0,310999 6,213107 1,932271 0,096721 15 606,9 0,798913 0,472512 6,408364 3,028027 0,223267 16 743 0,853261 0,651856 6,610696 4,30922 0,424916 17 1326 0,907609 0,867824 7,189922 6,239587 0,753118 18 1342,25 0,961957 1,184492 7,202103 8,530833 1,403021

Jumlah -9,75224 103,0853 -36,7183 28,33229

b = 0,83009 β = 1,204688

a = 6,176698 α = 481,3999

Page 14: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

Tabel Pengujian Kecocokan Distribusi Weibull Dua Parameter Ms 1 tahun 2006

No Ti (Jam) Xi =(ln Ti) Xi + 1 - Xi Mi a/Mi 1 70,9 4,26127 0,279361231 1,027277 0,2719432 93,75 4,540632 0,034079314 0,528594 0,0644723 97 4,574711 0,109732388 0,363389 0,3019694 108,25 4,684443 0,281891668 0,281692 1,0007095 143,5 4,966335 0,006944472 0,233535 0,0297366 144,5 4,97328 0,003454235 0,202291 0,0170767 145 4,976734 0,398544665 0,180882 2,2033418 216 5,375278 0,172824441 0,165807 1,0423239 256,75 5,548103 0,114857631 0,155189 0,740115

10 288 5,66296 0,027398974 0,147984 0,18514811 296 5,690359 0,261584335 0,14365 1,82098412 384,5 5,951944 0,120178661 0,142012 0,84625713 433,6 6,072122 0,305879195 0,14325 2,13528214 588,75 6,378002 0,329471751 0,148031 2,22569415 818,5 6,707473 0,044212697 0,157921 0,27996716 855,5 6,751686 0,189987404 0,176611 1,07573917 1034,5 6,941673 0,042579753 0,21452 0,19848818 1079,5 6,984253 0,714229538 0,316666 2,25546619 2205 7,698483

Jumlah 16,69471

S (19, 95%) = 0.67

S hitung = 0,6492

Tabel Estimasi Parameter Weibull Dua Parameter Ms 1 tahun 2006

No Ti (Jam) F(Ti) Xi Yi Xi,Yi Xi^2 1 70,9 0,036082 -3,30363 4,26127 -14,0777 10,91397 2 93,75 0,087629 -2,38914 4,540632 -10,8482 5,707995 3 97 0,139175 -1,89802 4,574711 -8,68291 3,602498 4 108,25 0,190722 -1,553 4,684443 -7,27494 2,411807 5 143,5 0,242268 -1,2822 4,966335 -6,36785 1,644043 6 144,5 0,293814 -1,05591 4,97328 -5,25131 1,114937 7 145 0,345361 -0,8588 4,976734 -4,27401 0,737534 8 216 0,396907 -0,68184 5,375278 -3,6651 0,46491 9 256,75 0,448454 -0,51914 5,548103 -2,88027 0,269511 10 288 0,5 -0,36651 5,66296 -2,07555 0,134332 11 296 0,551546 -0,22071 5,690359 -1,25591 0,048712 12 384,5 0,603093 -0,07899 5,951944 -0,47012 0,006239 13 433,6 0,654639 0,061251 6,072122 0,371922 0,003752 14 588,75 0,706186 0,202783 6,378002 1,293352 0,041121 15 818,5 0,757732 0,349043 6,707473 2,341199 0,121831 16 855,5 0,809278 0,504973 6,751686 3,409417 0,254997 17 1034,5 0,860825 0,679059 6,941673 4,713806 0,461121 18 1079,5 0,912371 0,889801 6,984253 6,214595 0,791746 19 2205 0,963918 1,200551 7,698483 9,242424 1,441324 Jumlah -10,3204 108,7397 -39,5371 30,17238

b = 0,794912 β = 1,258001

a = 6,154925 α = 471,0316

Page 15: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

Tabel Pengujian Kecocokan Distribusi Weibull Dua Parameter Ms 2 tahun 2004

No Ti (Jam) Xi =(ln Ti) Xi + 1 - Xi Mi a/Mi 1 54 3,98898405 0,280713403 1,027277 0,273262 71,5 4,26969745 0,099750403 0,528594 0,1887093 79 4,36944785 0,009448889 0,363389 0,0260024 79,75 4,37889674 0,18545145 0,281692 0,6583485 96 4,56434819 0 0,233535 06 96 4,56434819 0,108480643 0,202291 0,536267 107 4,67282883 0,282998223 0,180882 1,5645468 142 4,95582706 0,301668314 0,165807 1,8193949 192 5,25749537 0,113142656 0,155189 0,729064

10 215 5,37063803 0,296653338 0,147984 2,00463111 289,25 5,66729137 0,283351187 0,14365 1,97251112 384 5,95064255 0,162109992 0,142012 1,14152313 451,58 6,11275254 0,232006239 0,14325 1,6195914 569,5 6,34475878 0,042541323 0,148031 0,28738115 594,25 6,38730011 0,084273092 0,157921 0,53364116 646,5 6,4715732 0,269832293 0,176611 1,52783417 846,75 6,74140549 0,119865961 0,21452 0,55876418 954,58 6,86127145 0,28589435 0,316666 0,90282618 1270,5 7,1471658 Jumlah 16,34428

S (18, 95%) = 0.65

S hitung = 0,5228

Tabel Estimasi Parameter Weibull Dua Parameter Ms 2 tahun 2004

No Ti (Jam) F(Ti) Xi Yi Xi,Yi Xi^2 1 54 0,036082 -3,30363 3,988984 -13,1781 10,913972 71,5 0,087629 -2,38914 4,269697 -10,2009 5,7079953 79 0,139175 -1,89802 4,369448 -8,29332 3,6024984 79,75 0,190722 -1,553 4,378897 -6,80042 2,4118075 96 0,242268 -1,2822 4,564348 -5,85242 1,6440436 96 0,293814 -1,05591 4,564348 -4,81952 1,1149377 107 0,345361 -0,8588 4,672829 -4,01302 0,7375348 142 0,396907 -0,68184 4,955827 -3,3791 0,464919 192 0,448454 -0,51914 5,257495 -2,7294 0,269511

10 215 0,5 -0,36651 5,370638 -1,96841 0,13433211 289,25 0,551546 -0,22071 5,667291 -1,25082 0,04871212 384 0,603093 -0,07899 5,950643 -0,47002 0,00623913 451,58 0,654639 0,061251 6,112753 0,374411 0,00375214 569,5 0,706186 0,202783 6,344759 1,28661 0,04112115 594,25 0,757732 0,349043 6,3873 2,229444 0,12183116 646,5 0,809278 0,504973 6,471573 3,267968 0,25499717 846,75 0,860825 0,679059 6,741405 4,577812 0,46112118 954,58 0,912371 0,889801 6,861271 6,105165 0,79174619 1270,5 0,963918 1,200551 7,147166 8,58054 1,441324 Jumlah -10,3204 104,0767 -36,5335 30,17238

b = 0,814072 β = 1,228392

a = 5,919908 α = 372,3775

Page 16: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

Tabel Pengujian Kecocokan Distribusi Weibull Dua Parameter Ms 2 tahun 2005

No Ti (Jam) Xi =(ln Ti) Xi + 1 - Xi Mi a/Mi 1 130 4,867534 0,057906 1,034894 0,0559542 137,75 4,92544 0,130805 0,537085 0,2435473 157 5,056246 0,061748 0,372934 0,1655744 167 5,117994 0,280169 0,292518 0,9577835 221 5,398163 0,179679 0,245947 0,7305586 264,5 5,577841 0,490005 0,216712 2,2610917 431,75 6,067847 0,001736 0,197893 0,008778 432,5 6,069582 0,085276 0,186266 0,4578179 471 6,154858 0,111393 0,180402 0,617472

10 526,5 6,266251 0,004737 0,180072 0,02630711 529 6,270988 0,408611 0,186347 2,19274112 796 6,679599 0,095481 0,202727 0,47098513 875,75 6,775081 0,369327 0,239842 1,53987414 1267 7,144407 0,678839 0,344309 1,97159715 2498 7,823246

Jumlah 11,70007

S (15, 95%) = 0.7

S hitung = 0,621944

Tabel Estimasi Parameter Weibull Dua Parameter Ms 2 tahun 2005

No Ti (Jam) F(Ti) Xi Yi Xi,Yi Xi^2 1 130 0,04545 -3,06787 4,867534 -14,933 9,411842 2 137,75 0,11039 -2,14582 4,92544 -10,5691 4,604558 3 157 0,17532 -1,64628 5,056246 -8,324 2,71024 4 167 0,24026 -1,29179 5,117994 -6,61137 1,66872 5 221 0,305195 -1,01026 5,398163 -5,45356 1,020628 6 264,5 0,37013 -0,77167 5,577841 -4,30424 0,595471 7 431,75 0,43506 -0,56029 6,067847 -3,39974 0,313923 8 432,5 0,5 -0,36651 6,069582 -2,22458 0,134332 9 471 0,56493 -0,18361 6,154858 -1,1301 0,033713

10 526,5 0,62987 -0,00612 6,266251 -0,03833 3,74E-05 11 529 0,69480 0,171265 6,270988 1,074 0,029332 12 796 0,75974 0,354898 6,679599 2,370574 0,125952 13 875,75 0,82467 0,554526 6,775081 3,756959 0,307499 14 1267 0,88961 0,790156 7,144407 5,645193 0,624346 15 2498 0,95454 1,128508 7,823246 8,828598 1,273531

Jumlah -8,05087 90,19508 -35,3127 22,85412

b = 0,706697 β = 1,415033

a = 6,392307 α = 597,2329

Page 17: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

Tabel Pengujian Kecocokan Distribusi Weibull Dua Parameter Ms 2 tahun 2006

No Ti (Jam) Xi =(ln Ti) Xi + 1 - Xi Mi a/Mi 1 105,75 4,661078 0,20837786 1,048411 0,1987562 130,25 4,869456 0,635875855 0,552769 1,1503463 246 5,505332 0,236870049 0,39141 0,6051714 311,75 5,742202 0,035450739 0,314705 0,1126485 323 5,777652 0,197428745 0,273245 0,7225346 393,5 5,975081 0,030039806 0,251386 0,1194977 405,5 6,005121 0,203469153 0,243928 0,8341368 497 6,20859 0,956710231 0,251548 3,8032919 1293,75 7,1653 0,316255445 0,282879 1,117988

10 1775 7,481556 0,097612265 0,389071 0,25088511 1957 7,579168 Jumlah 8,915253

S (11, 95%) = 0.67

S hitung = 0,687114

Tabel Estimasi Parameter Weibull Dua Parameter Ms 2 tahun 2006

No Ti (Jam) F(Ti) Xi Yi Xi,Yi Xi^2 1 105,75 0,061404 -2,75877 4,661078 -12,8588 7,6108162 130,25 0,149123 -1,82333 4,869456 -8,87861 3,3245243 246 0,236842 -1,30826 5,505332 -7,2024 1,7115414 311,75 0,324561 -0,93549 5,742202 -5,37178 0,8751445 323 0,412281 -0,63204 5,777652 -3,65171 0,3994766 393,5 0,5 -0,36651 5,975081 -2,18994 0,1343327 405,5 0,587719 -0,12098 6,005121 -0,72651 0,0146368 497 0,675439 0,118032 6,20859 0,732815 0,0139329 1293,75 0,763158 0,364894 7,1653 2,614576 0,133148

10 1775 0,850877 0,643424 7,481556 4,813811 0,41399411 1957 0,938596 1,026145 7,579168 7,777325 1,052973 Jumlah -5,79289 66,97053 -24,9413 15,68452

b = 0,817422 β = 1,223359

a = 6,518706 α = 677,7009

Page 18: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

Tabel Pengujian Kecocokan Distribusi Weibull Dua Parameter Ms 3 tahun 2004

No Ti (Jam) Xi =(ln Ti) Xi + 1 - Xi Mi a/Mi 1 209,5 5,344724 0,051174 1,079055 0,0474252 220,5 5,395898 0,451263 0,591587 0,7628013 346,25 5,847161 0,872456 0,442789 1,9703654 828,5 6,719617 0,1748 0,387289 0,4513425 986,75 6,894417 0,310476 0,387714 0,8007866 1346 7,204893 0,742698 0,480648 1,5452017 2828,75 7,94759

Jumlah 5,577919 S (7, 95%) = 0.8

S hitung = 0,5015

Tabel Estimasi Parameter Weibull Dua Parameter Ms 3 tahun 2004

No Ti (Jam) F(Ti) Xi Yi Xi,Yi Xi^2 1 209,5 0,094595 -2,30888 5,344724 -12,3403 5,3309272 220,5 0,22973 -1,34318 5,395898 -7,24767 1,8041383 346,25 0,364865 -0,78984 5,847161 -4,61832 0,6238474 828,5 0,5 -0,36651 6,719617 -2,46283 0,1343325 986,75 0,635135 0,008195 6,894417 0,056497 6,72E-056 1346 0,77027 0,385842 7,204893 2,779948 0,1488747 2828,75 0,905405 0,85788 7,94759 6,818075 0,735957

Jumlah -3,5565 45,3543 -17,0146 8,778142

b = 0,864786 β = 1,15635

a = 6,918558 α = 1010,86

Tabel Pengujian Kecocokan Distribusi Weibull Dua Parameter Ms 3 tahun 2005

No Ti (Jam) Xi =(ln Ti) Xi + 1 - Xi Mi a/Mi 1 216 5,375278 0,441833 1,079055 0,4094632 336 5,817111 1,098612 0,591587 1,857063 1008 6,915723 0,10059 0,442789 0,2271744 1114,67 7,016314 0,377872 0,387289 0,9756855 1626,5 7,394186 0,272504 0,387714 0,7028496 2136 7,66669 0,028536 0,480648 0,0593697 2197,83 7,695226

Jumlah 4,2316 S (7, 95%) = 0.8

S hitung = 0,410697

Page 19: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

Tabel Estimasi Parameter Weibull Dua Parameter Ms 3 tahun 2005

No Ti (Jam) F(Ti) Xi Yi Xi,Yi Xi^2 1 216 0,094595 -2,30888 5,375278 -12,4109 5,3309272 336 0,22973 -1,34318 5,817111 -7,81344 1,8041383 1008 0,364865 -0,78984 6,915723 -5,46231 0,6238474 1114,67 0,5 -0,36651 7,016314 -2,57157 0,1343325 1626,5 0,635135 0,008195 7,394186 0,060592 6,72E-056 2136 0,77027 0,385842 7,66669 2,958128 0,1488747 2197,83 0,905405 0,85788 7,695226 6,601577 0,735957

Jumlah -3,5565 47,88053 -18,6379 8,778142 b = 0,816048 β = 1,225418

a = 7,254686 α = 1414,719

Tabel Pengujian Kecocokan Distribusi Weibull Dua Parameter Ms 3 tahun 2006

No Ti (Jam) Xi =(ln Ti) Xi + 1 - Xi Mi a/Mi 1 492,5 6,199494461 0,164963654 1,060046 0,1556192 580,83 6,364458115 0,072493214 0,566942 0,1278673 624,5 6,43695133 0,002399042 0,409157 0,0058634 626 6,439350371 0,234162491 0,337763 0,6932755 791,17 6,673512863 0,000417017 0,304777 0,0013686 791,5 6,673929879 0,217696018 0,297949 0,7306497 984 6,891625897 0,380772496 0,322189 1,181838 1440 7,272398393 0,426687388 0,424958 1,004079 2206,33 7,699085781 Jumlah 3,90054

S (9, 95%) = 0,74808

S hitung = 0,76

Tabel Estimasi Parameter Weibull Dua Parameter Ms 3 tahun 2006

No Ti (Jam) F(Ti) Xi Yi Xi,Yi Xi^2 1 492,5 0,074468 -2,55894 6,199494 -15,8641 6,5481782 580,83 0,180851 -1,61199 6,364458 -10,2595 2,5985263 624,5 0,287234 -1,08293 6,436951 -6,97076 1,1727364 626 0,393617 -0,69266 6,43935 -4,46028 0,4797785 791,17 0,5 -0,36651 6,673513 -2,44593 0,1343326 791,5 0,606383 -0,07002 6,67393 -0,4673 0,0049037 984 0,712766 0,221108 6,891626 1,523792 0,0488898 1440 0,819149 0,536541 7,272398 3,90194 0,2878769 2206,33 0,925532 0,954505 7,699086 7,348816 0,91108

Jumlah -4,6709 60,65081 -27,6933 12,1863

b = 0,387597 β = 2,580002

a = 6,940137 α = 1032,912

Page 20: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

Tabel Perhitungan Interval PM dengan Minimasi Downtime Mesin 1 Tahun 2004

MTB(jam) Dist. Weibull PM F Beta Alpha

Tp (jam)

Tf(jam) tp (jam) E(tp) D(tp)

3459 537,9664 1,26598 570,5504 10,125 7,5 4200 12,51837 0,024705397 1,26598 570,5504 10,125 7,5 1000 2,03482 0,025131723 1,26598 570,5504 10,125 7,5 1500 3,39981 0,023589828 1,26598 570,5504 10,125 7,5 2000 4,89356 0,023295413 1,26598 570,5504 10,125 7,5 2500 6,49099 0,023428086 1,26598 570,5504 10,125 7,5 3459 9,79101 0,024086065

Tabel Perhitungan Interval PM dengan Minimasi Downtime Mesin 1 Tahun 2005

MTB(jam) Dist. Weibull PM F Beta Alpha

Tp (jam)

Tf(jam) tp (jam) E(tp) D(tp)

4071,83 449,6389 1,20469 481,3999 16,375 15,04 449,6389 0,9211 0,06486464 1,20469 481,3999 16,375 15,04 100 0,1506 0,16017064 1,20469 481,3999 16,375 15,04 1500 3,9320 0,04979814 1,20469 481,3999 16,375 15,04 1800 4,8978 0,04957048 1,20469 481,3999 16,375 15,04 1900 5,2275 0,04957083 1,20469 481,3999 16,375 15,04 2000 5,5607 0,04959779 1,20469 481,3999 16,375 15,04 4071,83 13,0945 0,05217832

Tabel Perhitungan Interval PM dengan Minimasi Downtime Mesin 1 Tahun 2006

MTB(jam) Dist. Weibull

PM F Beta Alpha Tp (jam) Tf(jam) tp (jam) E(tp) D(tp)

5171,94 487,3421 1,258001 471,0316 21 3,4 449,64 0,9432 0,0514341 1,258001 471,0316 21 3,4 100 0,1423 0,1775531 1,258001 471,0316 21 3,4 5000 19,5258 0,0174044 1,258001 471,0316 21 3,4 5171,94 20,3742 0,0173836 1,258001 471,0316 21 3,4 5800 23,5340 0,0173537 1,258001 471,0316 21 3,4 6000 24,5594 0,0173563

Keterangan :

tp = Alternatif interval PM

Tp = Waktu yang diperlukan untuk perawatan prefentif

Tf = Waktu yang diperlukan untuk perawatan korektif

MTBPM = Mean Time Between Preventive Maintenance

MTBF = Mean Time Between Failure

E(tp) = Ekspetasi jumlah kerusakan dalam periode tp

D(tp) = Total downtime per-unit waktu

Page 21: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

Tabel Perhitungan Interval PM dengan Minimasi Downtime Mesin 2 Tahun 2004

MTB(jam) Dist. Weibull PM F Beta Alpha

Tp (jam) Tf(jam) tp (jam) E(tp) D(tp)

2207,875 375,7453 1,228392 372,3775 6,92 2,33 375,75 1,01112 0,024240 1,228392 372,3775 6,92 2,33 2000 7,88467 0,012602 1,228392 372,3775 6,92 2,33 2207,875 8,90299 0,012491 1,228392 372,3775 6,92 2,33 2800 11,92026 0,012360 1,228392 372,3775 6,92 2,33 2900 12,44533 0,012356 1,228392 372,3775 6,92 2,33 3000 12,97455 0,012355 1,228392 372,3775 6,92 2,33 3200 14,04503 0,012362 1,228392 372,3775 6,92 2,33 3500 15,67940 0,012391

Tabel Perhitungan Interval PM dengan Minimasi Downtime Mesin 2 Tahun 2005

MTB(jam) Dist. Weibull PM F Beta Alpha

Tp (jam) Tf(jam) tp (jam) E(tp) D(tp)

4295,75 593,65 1,415033 597,2329 8,25 4,53 593,65 0,9915215 0,021169 1,415033 597,2329 8,25 4,53 1400 3,338412 0,016597 1,415033 597,2329 8,25 4,53 1600 4,032742 0,016489 1,415033 597,2329 8,25 4,53 1700 4,3939666 0,016482 1,415033 597,2329 8,25 4,53 1800 4,7641227 0,016497 1,415033 597,2329 8,25 4,53 2000 5,5300785 0,016582 1,415033 597,2329 8,25 4,53 4295,75 16,313041 0,019086

Tabel Perhitungan Interval PM dengan Minimasi Downtime Mesin 2 Tahun 2006

MTB(jam) Dist. Weibull PM F Beta Alpha

Tp (jam) Tf(jam) tp (jam) E(tp) D(tp)

5065,833 676,2273 1,223359 677,7009 8,152 5,125 676,223 0,9973328 0,019380 1,223359 677,7009 8,152 5,125 3000 6,1715122 0,013224 1,223359 677,7009 8,152 5,125 3200 6,6785284 0,013210 1,223359 677,7009 8,152 5,125 3400 7,1926763 0,013208 1,223359 677,7009 8,152 5,125 3500 7,4523208 0,013211 1,223359 677,7009 8,152 5,125 5065,833 11,714991 0,013439

Keterangan :

tp = Alternatif interval PM

Tp = Waktu yang diperlukan untuk perawatan prefentif

Tf = Waktu yang diperlukan untuk perawatan korektif

MTBPM = Mean Time Between Preventive Maintenance

MTBF = Mean Time Between Failure

E(tp) = Ekspetasi jumlah kerusakan dalam periode tp

D(tp) = Total downtime per-unit waktu

Page 22: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

Tabel Perhitungan Interval PM dengan Minimasi Downtime Mesin 3 Tahun 2004

MTB(jam) Dist. Weibull PM F Beta Alpha

Tp (jam) Tf(jam) tp (jam) E(tp) D(tp)

4200 966,6071 1,156354 1010,862 7 7,6 966,6071 0,94955 0,014602 1,156354 1010,862 7 7,6 4400 5,47814 0,011036 1,156354 1010,862 7 7,6 4500 5,62237 0,011034 1,156354 1010,862 7 7,6 4600 5,76710 0,011033 1,156354 1010,862 7 7,6 4800 6,05802 0,011034 1,156354 1010,862 7 7,6 5000 6,35084 0,011038

Tabel Perhitungan Interval PM dengan Minimasi Downtime Mesin 3 Tahun 2005

MTB(jam) Dist. Weibull

PM F Beta Alpha Tp

(jam) Tf(jam) tp (jam) E(tp) D(tp)

2856 1233,571 1,225418 1414,719 7,15 15,62 100 0,03890 0,072400 1,225418 1414,719 7,15 15,62 1233,571 0,84543 0,016406 1,225418 1414,719 7,15 15,62 1500 1,07436 0,015879 1,225418 1414,719 7,15 15,62 2000 1,52845 0,015457 1,225418 1414,719 7,15 15,62 2500 2,00913 0,015369 1,225418 1414,719 7,15 15,62 2856 2,36515 0,015400 1,225418 1414,719 7,15 15,62 3500 3,03442 0,015553

Tabel Perhitungan Interval PM dengan Minimasi Downtime Mesin 3 Tahun 2006

MTB(jam) Dist. Weibull PM F Beta Alpha

Tp (jam) Tf(jam) tp (jam) E(tp) D(tp)

2856 948,5367 2,580002 1032,912 7,56 2,8 500 0,153836 0,015743 2,580002 1032,912 7,56 2,8 948 0,801461 0,010260 2,580002 1032,912 7,56 2,8 1200 1,472328 0,009674 2,580002 1032,912 7,56 2,8 1300 1,810056 0,009658 2,580002 1032,912 7,56 2,8 1400 2,191429 0,009730 2,580002 1032,912 7,56 2,8 2856 13,79030 0,016124

Keterangan :

tp = Alternatif interval PM

Tp = Waktu yang diperlukan untuk perawatan prefentif

Tf = Waktu yang diperlukan untuk perawatan korektif

MTBPM = Mean Time Between Preventive Maintenance

MTBF = Mean Time Between Failure

E(tp) = Ekspetasi jumlah kerusakan dalam periode tp

D(tp) = Total downtime per-unit waktu

Page 23: PERANCANGAN PROGRAM OPERASIONAL SDM DAN ORGANISASI PT PLN ... · PDF fileDivisi Permesinan & Jasa PT. Pindad, 2007, Profil Divisi Permesinan & Jasa PT. Pindad, dokumen yang tidak dipublikasikan

LAMPIRAN C  

Tabel Statistik