materi dart energi1

Upload: ismail-al-minangkabawi

Post on 06-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 Materi Dart ENERGI1

    1/26

    ECONOMY SCALE OF COAL BED

    METHANE (CBM) DEVELOPMENT

    Unggul Setyatmoko

    Country Manager Dart Energy Indonesia

    Palembang, 6 July 2011

  • 8/3/2019 Materi Dart ENERGI1

    2/26

    What is Coal Bed Methane (CBM)?

    Coal Bed Methane Conventional Gas

    Methane 94-98%

    Traces of: carbon dioxide

    ethane

    nitrogen

    Methane 70-90%

    ethane propane

    butane

    pentane trace

    carbon dioxide 0-8%

    nitrogen 0-5%

    hydrogen sulfide 0-5%

    Typical calorific

    value of1,040BTU/scf

    Typical calorific

    value of1,005BTU/scf

    Heating Value can be spiked

    via LPG or blending

  • 8/3/2019 Materi Dart ENERGI1

    3/26

    Methane gas adsorbed into coal seamsthat can hold 5 times as much gas as anequivalent volume of sandstone

    Gas held in coals by hydrostatic waterpressure

    By drawing down hydrostatic pressure(dewater) gas diffuses from the micropores into cleats and fractures.

    As water flow rates go down gas

    production initially increases.

    Result is high volumes of upfront water,slowly building gas production and longertimes to payback

    CBM and Water Production

    0

    20

    40

    60

    80

    100

    120

    140

    160

    180

    200

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

    Years of Operation

    MCFofCBM

    /Day

    0

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    GallonsofWater/Minute

    CBM

    Water

    CBM Production Mechanism

  • 8/3/2019 Materi Dart ENERGI1

    4/26

    Sandstone(Oil and Gas)

    Coal(CBM)

    ProducingR

    ate

    Producing Time

    Pressure

    ProducingR

    ate

    Producing Time

    Pressure

    Gas free in pore space

    Porespace

    Sand grain

    Gas adsorbed in matrix

    Buttcleat

    Facecleat

    In Comparison with Conventional Gas

    Water

    Gas

  • 8/3/2019 Materi Dart ENERGI1

    5/26

    Indonesias has the 5th largest potential CBM resources in the world.

    CBM Industry is only developed in North America and Australia to date..

    US 700 Tcf China 1,300 Tcf

    India 300 Tcf

    Indonesia 450 Tcf

    Australia 350 Tcf

    Canada 600 2,700 Tcf UK 70 Tcf

    Ukraine 70 Tcf

    Poland 100 Tcf

    Germany 100 Tcf

    South Africa 70 Tcf

    Russia 600 4,000 Tcf

    Source: Tri-Zen presentation to CSG 2010, Brisbane Conference March 2010

    World CBM Potential

  • 8/3/2019 Materi Dart ENERGI1

    6/26

    CBM Resources in Indonesia

    Indonesias potential CBM resources : 453 TCF

    32 CBM Blocks have been awarded by Government to date

    Source: MIGAS

  • 8/3/2019 Materi Dart ENERGI1

    7/26

    In Comparison with Conventional Gas

    1.27

    3.18

    8.15

    4.16

    52.59

    24.96

    24.21

    NATUNA

    5.72

    NORTH SUMATRA

    13.65

    28.00

    CENTRAL SUMATRA

    ACEH (NAD)

    SOUTH SUMATRA

    WEST JAVA

    5.08

    EAST JAVA

    EAST BORNEO

    CELEBES

    MOLUCCAS

    PAPUA

    (Advance Resources Interational, Inc., 2003 processed)

    Conventional Gas Reserves : 170 TCF (112 Proven + 58 Potential)

    CBM Resources : 453 TCF..

    Source: MIGAS

  • 8/3/2019 Materi Dart ENERGI1

    8/26

    Indonesia Suppy & Demand Overview

    Shortage by450 MMSCFD in 20163300 MMSCFD in 2025

    (Existing & FutureSupplies from SS

    Accounted)

    Limited DomesticDemand Large Supply

    Sources for Java

    Domestic Supply Shortage:50 MMSCFD in 2011

    200 MMSCFD in 2025

    Domestic Supply Shortage:

    75 MMSCFD in 2011 - 2014

    Domestic SupplyShortage in 2016 in

    Order to Fulfill ExportCommitment

    Supply Shortage:100 MMSCFD Now

    350 MMSCFD in 2025

    EXPORT

  • 8/3/2019 Materi Dart ENERGI1

    9/26

    Longer & Experimental Appraisal Program

  • 8/3/2019 Materi Dart ENERGI1

    10/26

    Ramp-up Risk & Length

  • 8/3/2019 Materi Dart ENERGI1

    11/26

    Number of Wells

  • 8/3/2019 Materi Dart ENERGI1

    12/26

    CBM Economics

  • 8/3/2019 Materi Dart ENERGI1

    13/26

    CBM : Margin Business - Manufacturing

    Development Parameters

    Luas (Km2) 1000

    Luas Sweet Spot (Km2) 350

    OGIP (BCF) 900

    Maximum Jumlah Sumur (120 Acres) 480

    Produksi (BCF) 265

    Harga Gas ($/MMBTU + 2% eskalasi) 6

    Capex (Juta $) 517

    Opex (Juta $) 424

    Total Investasi (Juta $) 941

    NORMAL DEVELOPMENT SCHEDULE

    IRR Kontraktor (%) 10.7

    NPV Kontraktor (Juta $) 8.5Gov Take (Juta $) 561

    ACCELERATED DEVELOPMENT

    IRR Kontraktor (%) 15.2

    NPV Kontraktor (Juta $) 50.4Gov Take (Juta $) 618

  • 8/3/2019 Materi Dart ENERGI1

    14/26

    Fast, Low Cost, Low Risk Exploration

  • 8/3/2019 Materi Dart ENERGI1

    15/26

    CBM Rig

    This Not This

  • 8/3/2019 Materi Dart ENERGI1

    16/26

    Logging Unit

    This Not This

  • 8/3/2019 Materi Dart ENERGI1

    17/26

    Drilling Cost Comparison

    Description Indonesia(USD)

    India(USD)

    China(USD)

    Australia(USD)

    Core Well 600,000 280,000 320,000 350,000

    Exploratory Wells 800,000 350,000 500,000 650,000

    Production Wells 900,000 600,000 650,000 750,000

    Land &

    Construction/m2

    26.5 - 30 27 - 30 3.5 - 35 18 - 28

  • 8/3/2019 Materi Dart ENERGI1

    18/26

    CBM Polycarbonate Pipeline

  • 8/3/2019 Materi Dart ENERGI1

    19/26

    Ability to Commercialize Small Volume

    Innovation in Early Pilot and Development Options

  • 8/3/2019 Materi Dart ENERGI1

    20/26

    No Technology Magic Bullet

    Three Basins Three Reservoirs Three Techniques

    Each coal bed is different and requires different completions

    and reservoir management techniques

    Source: IndoCBM Conference

  • 8/3/2019 Materi Dart ENERGI1

    21/26

    Contribution to Environmental Agenda

  • 8/3/2019 Materi Dart ENERGI1

    22/26

    CBM & Coal Mining Cooperation

    CBM will normally overlap with coal exploration and coal production

    tenures everywhere. Therefore, CBM company relationship with coal

    companies is critical.

    CBM companies work together with coal mining companies by

    generating CBM development plan which takes into account coal

    mining long term planning to maximise the value proposition for both

    parties.

    Produced CBM can be commercially negotiated with the coal mining

    company for its usage (power, CNG vehicles, etc.)

    There are a lot more cooperation with underground coal mining

    which benefit both parties.

  • 8/3/2019 Materi Dart ENERGI1

    23/26

  • 8/3/2019 Materi Dart ENERGI1

    24/26

    Dart Energy Indonesia

  • 8/3/2019 Materi Dart ENERGI1

    25/26

    They Say..

    the majority of successes in the CBM business have been at the hands of

    focused, energetic, low cost independents. Dart Energy is already establishing

    itself as a clear leader in that field.

    (Nick Davies, Chairman - Dart Energy Limited)

    dari pengalaman bertahun-tahun di dalam industri migas, pemboran

    sumur migas yang sangat kompleks selalu dapat diatasi melalui aplikasi

    teknologi. Akan tetapi, pemboran sumur CBM di Indonesia sangat

    sulit..karena dituntut untuk dikerjakan dengan biaya rendah untuk menjaga

    keekonomian proyek CBM.

    (Pudjo Suwarno, Direktur Medco CBM)

  • 8/3/2019 Materi Dart ENERGI1

    26/26

    Terima Kasih