laporan perencanaan baseline kab pasuruan revisi

28
LAPORAN MATAKULIAH GNSS PERENCANAAN PENGUKURAN BASELINE KABUPATEN PASURUAN JAWA TIMUR Oleh : Kindy Nurhakim 3513100083 Ilyas Kalyubi 3513100088 Khafid Ramadhan 3513100094 GNSS A JURUSAN TEKNIK GEOMATIKA FAKULTAS TEKNIK SIPIL DAN PERENCANAAN INSTITUT TEKNOLOGI SEPULUH NOPEMBER

Upload: khafid-ramadhan

Post on 28-Jan-2016

222 views

Category:

Documents


0 download

DESCRIPTION

LAPORAN PERENCANAAN BASELINE KAB PASURUAN REVIS

TRANSCRIPT

Page 1: Laporan Perencanaan Baseline Kab Pasuruan Revisi

LAPORAN MATAKULIAH GNSS

PERENCANAAN PENGUKURAN BASELINE KABUPATEN PASURUAN JAWA TIMUR

Oleh :

Kindy Nurhakim 3513100083

Ilyas Kalyubi 3513100088

Khafid Ramadhan 3513100094

GNSS A

JURUSAN TEKNIK GEOMATIKA

FAKULTAS TEKNIK SIPIL DAN PERENCANAAN

INSTITUT TEKNOLOGI SEPULUH NOPEMBER

2015

Page 2: Laporan Perencanaan Baseline Kab Pasuruan Revisi
Page 3: Laporan Perencanaan Baseline Kab Pasuruan Revisi

a. Perencanaan baseline metode jaring Kabupaten Pasuruan1. Pengukuran Baseline menggunakan metode jarring

Page 4: Laporan Perencanaan Baseline Kab Pasuruan Revisi

Daftar Baseline dengan pengukuran menggunakan 2 alat :

SESI BASE ROVER SESI BASE ROVER

1 INACORS TELKOM 9 26 3 19

2 INACORS TELKOM 8 27 3 20

3 INACORS TELKOM 26 28 3 118

4 INACORS TELKOM 41 29 3 17

5 INACORS TELKOM 42 30 3 19

6 INACORS TELKOM 27 31 1 16

7 8 26 32 1 17

8 8 23 33 16 33

9 8 7 34 16 34

10 8 9 35 16 17

11 7 23 36 34 33

12 7 6 37 34 51

13 6 23 38 34 35

14 6 22 39 34 18

15 6 5 40 34 17

16 5 4 41 51 33

17 5 22 42 51 66

18 4 22 43 51 52

19 4 21 44 51 35

20 4 3 45 52 66

21 21 3 46 52 67

22 21 20 47 52 68

23 21 24 48 52 53

24 21 22 49 52 55

25 3 2 50 67 66

Page 5: Laporan Perencanaan Baseline Kab Pasuruan Revisi
Page 6: Laporan Perencanaan Baseline Kab Pasuruan Revisi

SESI BASE ROVER SESI BASE ROVER

51 67 81 76 96 104

52 67 82 77 96 103

53 67 83 78 96 102

54 67 79 103 102

55 81 66 80 103 104

56 81 82 81 105 97

57 83 68 82 105 106

58 83 84 83 105 108

59 83 93 84 105 104

60 83 82 85 108 103

61 93 82 86 108 106

62 93 84 87 106 97

63 93 94 88 106 99

64 93 101 89 106 107

65 101 94 90 99 98

66 101 95 91 99 89

67 101 102 92 99 90

68 95 94 93 99 91

69 95 86 94 99 100

70 95 87 95 100 107

71 95 96 96 100 91

72 95 102 97 100 92

73 96 87 98 92 91

74 96 97 99 92 72

75 96 105 100 92 78

2.

Page 7: Laporan Perencanaan Baseline Kab Pasuruan Revisi

SESI BASE ROVER SESI BASE ROVER

101 76 91 126 65 47

102 76 75 127 65 49

103 76 61 128 65 111

104 76 62 129 47 46

105 76 78 130 47 48

106 62 61 131 47 31

107 62 45 132 47 49

108 62 63 133 47 64

109 62 79 134 31 48

110 62 78 135 31 30

111 79 78 136 31 14

112 79 63 137 31 32

113 79 113 138 31 50

114 113 63 139 31 49

115 113 64 140 50 49

116 113 80 141 50 32

117 113 109 142 50 112

118 80 64 143 32 14

119 80 65 144 32 15

120 80 111 145 32 112

121 80 110 146 14 15

122 80 109 147 14 13

123 110 109 148 14 12

124 110 111 149 14 30

125 65 64 150 12 13

1.

Page 8: Laporan Perencanaan Baseline Kab Pasuruan Revisi

SESI BASE ROVER SESI BASE ROVER

151 12 30 176 60 44

152 12 29 177 60 43

153 12 28 178 74 59

154 12 11 179 74 75

155 30 29 180 74 90

156 30 48 181 74 73

157 29 28 182 74 58

158 29 48 183 75 90

159 29 46 184 75 91

160 29 45 185 90 91

161 29 44 186 90 89

162 64 46 187 90 73

163 64 63 188 89 73

164 63 46 189 89 98

165 63 45 190 89 88

166 45 46 191 89 72

167 45 44 192 98 97

168 45 61 193 98 88

169 61 75 194 88 97

170 61 60 195 88 87

171 61 44 196 88 71

172 60 75 197 88 72

173 60 74 198 87 97

174 60 59 199 87 86

175 60 42 200 87 88

Page 9: Laporan Perencanaan Baseline Kab Pasuruan Revisi

SESI BASE ROVER SESI BASE ROVER

201 86 94 226 37 20

202 86 71 227 37 38

203 86 85 228 37 55

204 85 94 229 37 54

205 85 84 230 20 19

206 85 69 231 20 24

207 85 70 232 20 38

208 85 71 233 24 22

209 69 84 234 24 25

210 69 68 235 24 36

211 69 53 236 23 22

212 69 54 237 23 25

213 69 70 238 23 26

214 53 35 239 25 38

215 53 54 240 25 26

216 53 56 241 25 40

217 18 17 242 25 39

218 18 19 243 41 26

219 18 36 244 41 42

220 18 35 245 41 59

221 36 35 246 41 58

222 36 19 247 41 40

223 36 37 248 40 26

224 36 54 249 40 58

225 37 19 250 40 57

Page 10: Laporan Perencanaan Baseline Kab Pasuruan Revisi

SESI BASE ROVER SESI BASE ROVER

Page 11: Laporan Perencanaan Baseline Kab Pasuruan Revisi

251 40 39 276 27 10

252 39 57 277 27 11

253 39 56 278 27 28

254 39 55 279 27 43

255 39 38 280 10 9

256 55 54 281 10 11

257 55 38 282 28 11

258 55 56 283 28 43

259 56 70 284 28 28

260 56 71 285 44 43

261 56 72

262 56 57

263 70 54

264 70 71

265 72 71

266 72 57

267 72 73

268 73 57

269 73 58

270 58 57

271 58 59

272 42 59

273 42 27

274 42 43

275 27 9

Daftar Baseline dengan pengukuran menggunakan 3 alat :

Page 12: Laporan Perencanaan Baseline Kab Pasuruan Revisi

SESI BASE ROVER 1 ROVER 2 SESI BASE ROVER 1

ROVER 2

1 INACORS TELKOM 8 9 26 19 18 2

2 INACORS TELKOM 9 27 27 19 36 18

3 INACORS TELKOM 27 42 28 19 36 37

4 INACORS TELKOM 42 41 29 2 17 1

5 INACORS TELKOM 41 26 30 2 17 18

6 INACORS TELKOM 26 8 31 1 16 17

7 26 23 8 32 16 34 17

8 26 25 40 33 16 33 34

9 26 40 41 34 34 33 51

10 23 7 8 35 34 51 35

11 23 6 7 36 34 35 18

12 23 22 6 37 51 66 52

13 6 22 5 38 51 52 35

14 22 4 5 39 66 81 67

15 22 21 4 40 66 67 52

16 22 24 21 41 67 81 82

17 21 3 4 42 67 82 33

18 21 20 23 43 67 33 68

19 21 20 24 44 67 68 52

20 20 19 3 45 33 82 93

21 20 19 37 46 33 93 84

22 20 37 38 47 33 84 68

23 20 38 24 48 84 93 94

24 24 38 25 49 84 94 85

25 19 2 3 50 84 69 85

SESI BASE ROVER 1 ROVER 2 SESI BASE ROVER 1

ROVER 2

Page 13: Laporan Perencanaan Baseline Kab Pasuruan Revisi

51 84 68 69 76 71 85 86

52 94 93 101 77 71 85 70

53 94 86 95 78 71 56 70

54 94 85 86 79 71 72 56

55 95 101 102 80 70 54 69

56 95 96 102 81 70 54 55

57 95 87 96 82 70 55 56

58 95 86 87 83 54 69 53

59 96 102 103 84 54 53 36

60 96 102 104 85 54 52 68

61 96 105 104 86 54 37 55

62 96 97 105 87 53 52 68

63 96 87 97 88 55 35 36

64 105 104 108 89 55 38 39

65 105 106 108 90 55 39 56

66 105 97 106 91 39 25 40

67 106 97 98 92 39 56 57

68 106 98 99 93 57 72 73

69 106 99 107 94 57 73 58

70 98 97 88 95 57 40 58

71 98 88 89 96 58 41 59

72 98 89 99 97 58 59 74

73 98 71 87 98 58 73 74

74 88 71 72 99 74 73 90

75 88 72 92 100 74 90 75

SESI BASE ROVER 1 ROVER 2 SESI BASE ROVER 1

ROVER 2

Page 14: Laporan Perencanaan Baseline Kab Pasuruan Revisi

101 74 75 60 126 80 64 65

102 74 59 60 127 80 65 111

103 90 73 89 128 80 111 110

104 90 89 99 129 80 110 109

105 90 99 91 130 80 113 109

106 90 91 75 131 65 64 47

107 91 99 100 132 65 47 49

108 91 100 92 133 49 31 47

109 91 92 76 134 49 31 50

110 91 75 76 135 50 32 112

111 99 107 100 136 50 32 31

112 79 75 61 137 32 31 14

113 79 61 62 138 32 14 15

114 79 62 78 139 14 31 30

115 79 78 92 140 14 12 30

116 62 61 45 141 14 13 12

117 62 45 63 142 31 48 47

118 62 63 79 143 31 40 48

119 62 78 79 144 47 46 64

120 63 45 46 145 46 29 45

121 63 46 64 146 29 12 30

122 62 64 113 147 29 12 28

123 63 79 113 148 29 28 44

124 113 64 80 149 28 11 12

125 113 80 109 150 28 11 27

SESI BASE ROVER 1 ROVER 2

Page 15: Laporan Perencanaan Baseline Kab Pasuruan Revisi

151 28 27 43

152 28 60 44

153 43 60 44

154 43 42 60

155 42 59 60

156 60 61 44

157 27 10 11

158 27 9 10

Daftar Baseline dengan pengukuran menggunakan 4 alat :

Page 16: Laporan Perencanaan Baseline Kab Pasuruan Revisi

SESI BASE ROVER 1 ROVER 2 ROVER 3 SESI BASE ROVER 1

ROVER 2

ROVER 3

Page 17: Laporan Perencanaan Baseline Kab Pasuruan Revisi

1 INACORS 8 26 41 46 89 88 98 992 INACORS 41 42 47 47 89 88 72 733 INACORS 8 9 27 48 98 97 106 994 8 7 23 26 49 99 106 107 1005 23 7 6 22 50 106 97 105 1086 22 6 5 4 51 105 106 104 1087 22 4 21 24 52 96 102 103 1048 21 4 3 20 53 96 102 95 879 20 3 19 37 54 97 96 87 98

10 20 55 38 24 55 95 102 101 9411 24 39 25 22 56 95 94 86 8712 25 40 26 23 57 86 85 71 8713 25 39 57 40 58 72 57 56 7114 40 39 57 58 59 72 56 71 8815 40 57 58 41 60 71 85 70 5616 58 54 73 74 61 56 70 55 5717 58 74 59 41 62 55 38 37 5418 59 74 60 42 63 54 53 69 7019 42 60 43 27 64 69 68 64 8520 27 9 10 11 65 94 101 94 8421 27 11 28 43 66 94 93 84 8522 28 11 12 29 67 93 82 83 8423 28 29 44 43 68 33 82 67 6824 22 13 14 40 69 68 67 52 5325 14 15 32 31 70 67 82 81 6626 32 12 50 31 71 52 66 51 3527 31 50 49 47 72 54 53 36 3728 31 47 48 30 73 36 53 35 1829 29 12 30 48 74 19 3 2 1830 47 49 64 65 75 19 2 18 3631 65 111 80 64 76 2 1 17 1832 80 11 110 109 77 17 1 16 3433 80 109 113 64 78 34 16 33 5134 113 79 63 46 79 34 51 35 1835 63 45 46 6436 46 47 29 4537 45 61 62 6338 61 60 44 4539 61 60 75 7640 62 76 78 7941 76 91 92 7842 91 99 100 9243 91 99 90 75

Page 18: Laporan Perencanaan Baseline Kab Pasuruan Revisi

44 90 73 74 7545 90 73 89 99

b. Perencanaan baseline metode radial Kabupaten Gresik

Perencanaan Baseline menggunakan mettode Radial :

Page 19: Laporan Perencanaan Baseline Kab Pasuruan Revisi

Daftar Baseline dengan pengukuran radial menggunakan 2 alat :

SESI BASE ROVER SESI BASE ROVER

Page 20: Laporan Perencanaan Baseline Kab Pasuruan Revisi

1 INACORS TELKOM 9 , 27 35 93 94 , 1012 INACORS TELKOM 42 , 59 36 53 67 , 683 INACORS TELKOM 41 , 8 37 67 81 , 824 8 7 , 23 38 67 835 8 26 39 59 58 , 756 23 6 , 22 40 59 607 23 25 41 58 73 , 748 22 5 , 21 42 73 72 , 899 1 4 , 3 43 73 90

10 21 20 44 89 98 , 9911 3 2 , 19 45 99 100 , 10712 2 1 , 17 46 99 10613 2 18 47 106 105 , 10814 17 16 , 34 48 75 91 , 9215 54 33 , 51 49 75 7616 51 66, 52 50 27 10 , 1117 18 35 , 36 51 27 28 , 4318 20 37 , 38 52 28 12 , 2919 25 38 , 39 53 28 4420 25 40 54 29 45 , 4621 39 57 , 56 55 46 63 , 6422 39 55 56 64 65 , 8023 56 71 57 64 7924 71 87 , 88 58 12 13 , 1425 71 86 59 12 3026 87 95 , 96 60 14 15 , 3227 87 97 61 14 3128 96 102 , 103 62 32 112 , 4929 96 10430 55 5431 54 70 , 6932 54 5333 69 8434 84 86 , 93

Page 21: Laporan Perencanaan Baseline Kab Pasuruan Revisi

c. Perencanaan Waktu Pengukuran

Perencaan menggunakan metode jaring : terdapat satu titik ikat dan 285 baseline

Titik ikat yang digunakan : Titik INACORS TELKOM

1) 2 alat GPS terdapat 285 sesi dimana setiap sesi membutuhkan waktu 2 jam.

Sehingga waktu yang dibutuhkan = 285 x 2 jam

= 570 jam ( ±48 hari dengan asumsi waktu

pengukuran per hari ialah 12 jam)

2) 3 alat GPS terdapat 158 sesi dimana setiap sesi membutuhkan waktu 2 jam.

Sehingga waktu yang dibutuhkan = 158 x 2 jam

= 316 jam ( ±27 hari dengan asumsi waktu

pengukuran per hari ialah 12 jam)

3) 4 alat GPS terdapat 79 sesi dimana setiap sesi membutuhkan waktu 2 jam.

Sehingga waktu yang dibutuhkan = 79 x 2 jam

= 158 jam ( ± 14 hari dengan asumsi waktu

pengukuran per hari ialah 12 jam)

Dengan metode radial terdapat titik ikat dengan 103 baseline

Titik ikat yang digunakan : Titik INACORS TELKOM

1. 2 Alat GPS terdapat 62 sesi dimana setiap sesi membutuhkan waktu 2 jam.

Sehingga waktu yang dibutuhkan = 62 x 2 jam

= 124 jam ( ±11 hari dengan asumsi waktu

pengukuran per hari ialah 12 jam)

2. 3 Alat GPS terdapat sesi dimana setiap sesi membutuhkan waktu 2 jam.

Sehingga waktu yang dibutuhkan = 31 x 2 jam

= 62 jam ( 6 hari dengan asumsi waktu

pengukuran per hari ialah 12 jam)

Page 22: Laporan Perencanaan Baseline Kab Pasuruan Revisi

3. 4 Alat GPS terdapat sesi dimana setiap sesi membutuhkan waktu 2 jam.

Sehingga waktu yang dibutuhkan = 15 x 2 jam

= 30 jam ( 3 hari dengan asumsi waktu

pengukuran per hari ialah 12 jam)

d. Perencanaan jumlah surveyor yang dibutuhkan

1) 2 alat GPS membutuhkan 4 orang surveyor.

2) 3 alat GPS membutuhkan 6 orang surveyor.

3) 4 alat GPS membutuhkan 8 orang surveyor.

Page 23: Laporan Perencanaan Baseline Kab Pasuruan Revisi

e. Pengeluaran biaya dengan metode jaring

Nama barang/jasa2 alat 3 alat 4 alat

jumlah biaya Jumlah biaya jumlah biayaSurveyor(@350000) 4 orang 1400000 6 orang 2100000 8 orang 2800000Sewa Alat GPS (@1000000) 2 buah 2000000 3 buah 3000000 4 buah 4000000Sewa Aki(@900000) 2 buah 1800000 3 buah 2700000 4 buah 3600000Sewa mobil(@450000) 2 buah 900000 2 buah 900000 2 buah 900000Hotel(@300000) 1 buah 300000 2 buah 600000 2 buah 600000Konsumsi(3x@30000) 3x6 orang 180000 3x8 orang 240000 3x10 orang 300000Supir(@100000) 2 orang 200000 2 orang 200000 2 orang 200000Bensin(@200000)

1 hari x 2 mobil 400000

1 hari x 2 mobil 400000

1 hari x 2 mobil 400000

TOTAL 7180000 TOTAL 10140000 TOTAL 12800000

Hari*TOTAL 4834464000

0 272

73780000 1417920000

0Baseline(@300000) 285 85500000 158 47400000 79 23700000Laporan 1 buah 2500000 1 buah 2500000 1 buah 2500000

TOTAL43264000

0 TOTAL3236

80000 TOTAL20540000

0

1) Pengeluaran biaya untuk pengukuran menggunakan 2 alat GPS membutuhkan sekitar Rp 432.640.000,00 dengan waktu pelaksanaan sekitar 50 hari.

2) Pengeluaran biaya untuk pengukuran menggunakan 3 alat GPS membutuhkan sekitar Rp 323.680.000,00 dengan waktu pelaksanaan kira-kira 25 hari.

3) Pengeluaran biaya untuk pengukuran menggunakan 4 alat GPS mebutuhkan sekitar Rp rp 205.400.000, dengan waktu pelaksanaan kira-kira 17 hari.

Page 24: Laporan Perencanaan Baseline Kab Pasuruan Revisi

f. Pengeluaran biaya dengan menggunakan metode Radial

Nama barang/jasa2 alat 3 alat 4 alat

jumlah biaya jumlah biaya Jumlah biayaSurveyor(@350000) 4 orang 1400000 6 orang 2100000 8 orang 2800000Sewa Alat GPS (@1000000) 2 buah 2000000 3 buah 3000000 4 buah 4000000Sewa Aki(@900000) 2 buah 1800000 3 buah 2700000 4 buah 3600000Sewa mobil(@450000) 2 buah 900000 2 buah 900000 2 buah 900000Hotel(@300000) 1 buah 300000 2 buah 600000 2 buah 600000Konsumsi(3@30000) 3x6 orang 180000 3x8 orang 240000 3x10 orang 300000Supir(@100000) 2 orang 200000 2 orang 200000 2 orang 200000Bensin(@200000)

1 hari x 2 mobil 400000

1 hari x 2 mobil 400000

1 hari x 2 mobil 400000

TOTAL 7180000 TOTAL 10140000 TOTAL 12800000

Hari*TOTAL14360000

010140000

0 89600000Baseline(@300000) 29400000 14700000 9900000Laporan 1 buah 2000000 1 buah 2000000 1 buah 2000000

TOTAL17500000

0 TOTAL11810000

0 TOTAL10150000

0

1) Pengeluaran biaya untuk pengukuran menggunakan 2 alat GPS membutuhkan sekitar Rp 175.000.000, dengan waktu pelaksanaan sekitar 2 hari.

2) Pengeluaran biaya untuk pengukuran menggunakan 3 alat GPS membutuhkan sekitar Rp 118.100.000, dengan waktu pelaksanaan kira-kira 2 hari.

3) Pengeluaran biaya untuk pengukuran menggunakan 4 alat GPS mebutuhkan sekiktar Rp 101.500.000, dengan waktu pelaksanaan kira-kira 1 hari.