greenship eb presentation 1.0 for pusair

Upload: yudi-lasmana

Post on 03-Jun-2018

232 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    1/69

    GREENSHIP R TING TOOLSFOR EXISTING BUILDING

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    2/69

    Koalisi international yang diprakarsai oleh bisnis danindustri

    94 negara di dunia telah bergabung dalam World GBC

    Negara-negara anggota mewakili lebih dari 50% aktifitas

    konstruksi global

    Misi World GBC adalah mempercepat transformasicara

    mengembangkan lingkungan binaan (built environment)

    Tentang World GBC

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    3/69

    Council development World GBC

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    4/69

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    5/69

    Perform a variety of educational activities among the general public and the

    Green Building Certification held in Indonesia under Indonesian special

    assessment tools that are named GREENSHIP

    And this success will not be achieved without

    support and concern from industries ,

    communities and relevant government agencies

    Independent, non government and not for profit organizationGBCI will be audited by international finance auditing and will be

    distributed via the web

    Emerging Member of the World Green Building Council (WGBC):

    who headquartered in Toronto-Canada, currently has more than

    73 countries and recognizes only one GBC in every country

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    6/69

    Non governmental and not forprofit organizationEstablished : April 2008 7 Initiator 50 professionals as a core founder

    Developer, designer, architect,

    builders and facility management,

    contractors, suppliers, machine

    engineers, mechanical andelectrical engineers, etc

    Emerging member of World Green

    Building Council

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    7/69

    for

    Sustainability in

    Indonesia

    Transform the Market

    Educating the general and industries

    Open - Dialogue to Industry

    Community buildings

    Green leadership

    Preparing tools and experts

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    8/69

    Transformasimenujumasyarakat Indonesiayang berbasis

    sumberdayaberkelanjutan

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    9/69

    Greenship Associate

    Greenship Professional

    Greenship

    TAGTechnical Advisory Group

    Sertifikasi Green Building

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    10/69

    OrganisasiDEWAN PENDIRI

    DEWAN PENGARAH

    DEWAN PENGURUS

    A N G G O T A

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    11/69

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    12/69

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    13/69

    Building Sectors Global Impact

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    14/69

    Green Building

    14

    Reduce the usage of natural resources : Energy

    Water

    Material

    Minimize environment impact :

    Waste Site

    Improve indoor health & comfort :

    Reduce SBS

    Increase productivity

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    15/69

    Action

    Transformed

    Potential ResultsClimate Change

    Photo: American Scientific, September 07 issue

    No Action

    Business

    As Usual

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    16/69

    Intergovernmental Panel on Climate Change 4

    th

    Assessment Report (2007) Findings

    IPCC recommendation :To avoid 2 oC increase by CO2 emmision reduction:

    40% by 2020

    80% by 2050Building sector has greatest potential for CO2reduction

    lowest CO2 reduction implementation costcost effective

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    17/69

    Building Sector Responsibility

    Contribute on global warming

    FIGHTING THE CLIMATE CHANGE

    Should play a significant role

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    18/69

    GREENSHIP RATING SEBAGAI ACUAN PENGEMBANGAN

    DENGAN KONSEP GREEN BUILDING

    TERUKUR DAN OBYEKTIF

    MENGACU RATING WORLD GBC,DISESUAIKAN KONDISI LOKAL

    BERDASARKAN DATA

    DILAKUKAN EVALUASI PERIODIK

    INTI PENCAPAIAN :

    COMPLY SEMUA PERATURAN YANG BERLAKU

    ENERGY SAVING

    MENGURANGI BEBAN INFRASTRUKTUR KOTA

    KONSERVASI SUMBER DAYA

    PENGAKUAN ATAS KOMITMEN HIJAU

    18

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    19/69

    Why building should be green building

    Reducing the usage of national natural source,

    conserve the source to extend the availability,

    avoid energy crisis

    Reducing CO2 emission, reducing global

    warming, fighting the climate change impact

    Effective investment &reduce operating cost,

    improve profit, financial performance & building

    value

    Financial

    Benefit

    Country

    Benefit

    GlobalBenefit

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    20/69

    RATING ANALYSIS INTENTION

    Sustainability in building:

    by increasingthe efficiency of use in energy, water,

    materials and resources while reducing building impacts onhuman health and the environment during building lifecycle

    through better siting, design, construction, operation,

    maintenance and removal. (Frej, Anne B., editor. Green Office Buildings: APractical Guide to Development. Washington, D.C.: ULI--The Urban Land Institute, 2005. Pp 48)

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    21/69

    Existing Building vs New Building

    Description1: Starting Point, 2: IMB, 3. First SLF, 4. SLF

    1

    Planning

    and

    Design

    2 4

    Construction

    Operation

    and

    Maintenance

    NEW BUILDING

    3

    EXISTING BUILDING

    Existing Building is a building which has one year minimum inoperation and maintenance phase

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    22/69

    RATING ANALYSIS WRITTING METHODS

    Regulation :

    SNI, ASHRAE

    Peraturan: PP,

    Perda, Permen Keputusan: KepPres

    Local Need and Specifications

    availability of simple and proven technologies

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    23/69

    Greenship Existing Building

    Kategori Point

    Maksimum

    Persentase

    Appropriate Site Development 16 13,68%

    Energy Efficiency & Conservation 36 30,77 %

    Water Conservation 20 17,09 %

    Material Resource and Cycle 12 10,26 %

    Indoor Health and Comfort 20 17,09 %

    Building Environment Management 13 11,11 %

    TOTAL POINT 117 100 %

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    24/69

    Achievement Percentage Minimum Point New

    Building

    Platinum 73 % 83Gold 57 % 66

    Silver 46 % 53

    Bronze 35 % 41

    Total 117

    Re-certification: 3 Years

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    25/69

    GREENSHIP CATEGORY

    Energy Efficiency

    and Conservation(2 prerequisites +5 criterias

    + 2 bonus,

    36 points + 8 bonus points)

    Water Conservation

    (1 prerequisite + 7 criterias + 1 bonus,

    20 points + 2 bonus points)

    Indoor Health and Comfort

    (1 prerequisite + 8 criterias,

    20 points)

    Appropiate Site Development

    (2 prerequisites +8 criterias,

    16 points)

    Material Resources and Cycle

    (3 prerequisites + 5 criterias,12 points)

    Building Environment Management(1 prerequisite + 5 criterias,

    13 points)

    Jumlah Kriteria : (10P + 41K + 3B)

    Jumlah Nilai : (117P + 10B)

    13,68%

    30,77 %

    17,09 %

    10,26 %

    17,09 %

    11,11 %

    Launched January, 2011

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    26/69

    New Building 1 1Perbandingan GREENSHIP

    Existing Building 1 0 Interior Space1 0

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    27/69

    ELIGIBILITY

    Luas bangunan sekurang-kurangnya 2500m2

    Telah memiliki Sertifikat Laik Fungsi (SLF) yang

    dikeluarkan oleh Pemerintah Daerah setempat

    Bersedia menandatangani surat yang berisi persetujuan

    untuk memperbolehkan seluruh data gedung

    dipergunakan untuk dipelajari dalam studi kasus yangdiselenggarakan oleh GBC INDONESIA.

    Telah memiliki laporan implementasi Pengelolaan

    Lingkungan Hidup disahkan oleh Bapedal

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    28/69

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    29/69

    Appropriate Site Development

    Prerequisite 1 Site Management Policy

    Prerequisite 2 Motor Vehicle Reduction Policy

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    30/69

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    31/69

    Appropriate Site Development

    ASD 1 Community Accessibility 2 Points

    ASD 2 Motor Vehicle Reduction 1 Point

    ASD 3 Bicycle 2 Points

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    32/69

    ASD 4 Site Landscaping 3 Points

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    33/69

    Appropriate Site Development

    ASD 4 Site Landscaping 3 Points

    ASD 5 Heat Island Effect 2 Points

    ASD 6 Stormwater Management 2 Points

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    34/69

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    35/69

    Appropriate Site Development

    ASD 7 Site Management 2 Points

    ASD 8 Building Neighbourhood 2 Points

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    36/69

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    37/69

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    38/69

    Energy Efficiency and Conservation

    Prerequisite 1 Policy and Energy Management Plan

    Prerequisite 2 Minimum Building Energy Performance

    Perkantoran 250 kWh/m2.tahun

    Mall 450 kWh/m2.tahun

    Hotel atau Apartemen 350 kWh/m2.tahun).

    EEC 1 Optimized Efficiency Building Energy Performance 16 Points

    6

    Months

    EEC 2 Testing, Recommisioning or Retrocommisioning 2 Points

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    39/69

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    40/69

    EEC 3 S t E P f 12 P i t

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    41/69

    Energy Efficiency and Conservation

    EEC 3 System Energy Performance 12 Points

    EEC 4 Energy Monitoring and Control 3 Points

    EEC 5 Operation and Maintenance 3 Points

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    42/69

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    43/69

    Energy Efficiency and Conservation

    EEC 6 On Site Renewable Energy 5 Bonus

    Points

    EEC 7 Less Energy Emission 3 BonusPoints

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    44/69

    P i it 1 W t M t P li

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    45/69

    Water Conservation

    Prerequisite 1 Water Management Policy

    WAC 1 Water Sub-Metering 1 Point

    WAC 2 Water Monitoring Control 2 Points

    WAC 3 Fresh Water Efficiency 8 Points

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    46/69

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    47/69

    Water Conservation

    WAC 4 Water Quality 1 Point

    WAC 5 Recycled Water 5 Points

    WAC 6 Potable Water 1 Point

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    48/69

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    49/69

    Water Conservation

    WAC 7 Deep Well Reduction 2 Points

    WAC 8 Water Tap Efficiency 2 Bonus Points

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    50/69

    Prerequisite 1 Fundamental Refrigerant

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    51/69

    Material Resources and Cycle

    Prerequisite 1 Fundamental Refrigerant

    Prerequisite 2 Material Purchasing Policy

    Prerequisite 3 Waste Management Policy

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    52/69

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    53/69

    MRC 1 Non ODS Usage 2 Points

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    54/69

    Material Resources and Cycle

    MRC 2 Material Purchasing Practice 3 Points

    MRC 3 Waste Management Practice 4 Points

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    55/69

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    56/69

    Material Resources and Cycle

    MRC 4 Hazardous Waste Management 2 Points

    MRC 5 anagement of Used Good 1 Point

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    57/69

    Prerequisite 1 No Smoking Campaign

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    58/69

    Indoor Health and Comfort

    q No Smoking Campaign

    IHC 1 Outdoor Air Introduction 2 Points

    IHC 2 Environmental Tobacco Smoke Control 2 Points

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    59/69

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    60/69

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    61/69

    IHC 3 CO2and CO Monitoring 2 Points

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    62/69

    Indoor Health and Comfort

    IHC 4 Physical and Chemical Pollutants 6 Points

    IHC 5 Biological Pollutant 3 Points

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    63/69

    IHC 6 Visual Comfort 1 Point

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    64/69

    Indoor Health and Comfort

    IHC 7 Acoustic Level 1 Point

    IHC 8 Building User Survey 3 Points

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    65/69

    Prerequisite 1 Operation & Maintenance Policy

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    66/69

    Building Environment Management

    BEM 1

    Innovations 5 Points

    BEM 2 Design Intent & Owner's Project Requirement 2 Points

    As Built Drawings

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    67/69

    BEM 3 Green Operational & Maintenance Team 2 Points

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    68/69

    Building Environment Management

    p

    BEM 4 Green Occupancy/Lease 2 Points

    BEM 5 Operation and Maintenance Training 2 Points

  • 8/12/2019 Greenship EB Presentation 1.0 for PUSAIR

    69/69

    TERIMA KASIH

    Contact : [email protected]

    Mulai perubahan dari

    sekarang, untuk Masa

    Depan Bumi Kita

    mailto:[email protected]:[email protected]