GE Power
Convegno ATI ANIMP Milano/Italy | 5th July , 2018
Mathieu Kupcic – Product Marketing Leader 9HA
Dino Pezzella – Senior Sales Manager EU
Towards 65% efficiency: GE solution for advanced
combined cycle power plant with HA gas turbine
© 2018, General Electric Company.
GE Proprietary Information - The information contained in this document is General Electric Company (GE) proprietary information. It is the
property of GE and shall not be used, disclosed to others or reproduced without the express written consent of GE, including, but without
limitation, in the creation, manufacture, development, or derivation of any repairs, modifications, spare parts, or configuration changes or to obtain
government or regulatory approval to do so, if consent is given for reproduction in whole or in part, this notice and the notice set forth on each
page of this document shall appear in any such reproduction in whole or in part. The information contained in this document may also be
controlled by the US export control laws. Unauthorized export or re-export is prohibited. This presentation and the information herein are provided
for information purposes only and are subject to change without notice. NO REPRESENTATION OR WARRANTY IS MADE OR IMPLIED AS TO ITS
COMPLETENESS, ACCURACY, OR FITNESS FOR ANY PARTICULAR PURPOSE.
All relative statements are with respect to GE technology unless otherwise noted.
GE Power
© 2018, General Electric Company. Proprietary information. All rights reserved. 3
Global electricity trends
1.1 billion people lack
access to
reliable power
Gas will continue to play a key role,
more power generated in the U.S.
using gas than from any other
fuel source in 2016
~20% power added in the
next decade predicted
to be gas power
© 2018 General Electric Company - All rights reserved
ofLandscape Changing
© 2018, General Electric Company. Proprietary information. All rights reserved. 4
Gas: A natural choice in power generation mix
Efficient Use of Land:
20 kW/m2 HIGHEST IN THE INDUSTRY
• NUCLEAR .... ~7 kW/m2
• COAL ............. ~2 kW/m2
• SOLAR ........... ~0.2 kW/m2
• WIND ............. ~0.2 kW/m2
© 2018, General Electric Company. Proprietary information. All rights reserved. 5
Agenda
• Product Portfolio
• HA Technology Overview
• Plant Solution / Integrated Systems
• Operational Flexibility
• Fleet Status
• Digital
Product Portfolio
© 2018, General Electric Company. Proprietary information. All rights reserved. 7
World’s Largest and Most Reliable Gas Turbine Fleet
Source: ORAP®. All rights to underlying data reserved: SPS ®.
Modified by GE. Rolling 12-month data Jun 2015 – Jul 2016.
GE
Fleet
(%)
Delta vs.
Industry
(% pts)
Reliability
Availability
Start Reliability
98.0
92.3
97.9
+0.2
+0.7
+0.3
+7000 Gas Turbines
+300M Operating Hours
+1600 GW
34 / 48 34 / 48
44 / 68 57 / 76 57 / 85
75 / 95 87 / 134
117 / 142 132 / 204
145 / 216 210 / 305
265 / 409 288 / 443
314 / 493 446 / 660
557 / 826
TM2500
LM2500
6B.03 LM6000
6F.01 LM9000
6F.03
LMS100 9E.03
9E.04 GT13E2
9F.03
9F.04 9F.05
9HA.01 9HA.02
36 / 50 36 / 50 44 / 68
57 / 76 57 / 76
75 / 95 87 / 134 91 / 142
117 / 140 198 / 305
243 / 376 290 / 438
384 / 573
TM2500
LM2500
6B.03
6F.01
LM6000
LM9000
6F.03
7E.03
LMS100
7F.04
7F.05
7HA.01
7HA.02
Electric Power Output (MW): SC / CC (1x1 Configuration), Net, ISO
© 2018, General Electric Company. Proprietary information. All rights reserved. 8
Industry dynamics … shifting to higher efficiency flexible H-Class
Source – McCoy Power Reports, GE Power Marketing
The H class advantage
50%+ less cost/kw than all other
energy sources
Best power density/land use of all
technologies
Operating flexibility & dispatchability offsets
renewables variability
World record efficiencies…
1 Gas Turbine powers 750,000 homes
1,100mw Combined Cycle Plant requires
17 acres of land
Full Gas Turbine output in less than 10 minutes
~1pt. Combined Cycle Advantage investing for
65% early/mid next decade
1
2
3
4
Gas turbine firing temperature °C
C o
m b
in e
d c
yc le
e ff
ic ie
n cy
%
1260 14301090 1600+
Introduced
‘03 steam-cooled
Introduced
‘13 air-cooled
Introduced
‘86
Introduced
‘72
55
60
65
50
HA Technology Overview
© 2018, General Electric Company. Proprietary information. All rights reserved. 10
HA gas turbine platform evolution Three generations of gas turbine technology
DLN
2.6+
9H 2003200320032003
7/9HA 2014201420142014
7F.04/05 2012201220122012
9F.05 2005200520052005
4-stage VGV
4-stage turbine
14-stage compressor
Advanced HGP
Note: Year denotes first operation
Product GT Output
(MW) 1x1 CC Output
(MW) Eff; 1x1 CC, (%)
7HA.01 290 438 62.3
7HA.02 384 573 63.3
9HA.01 446 660 63.5
9HA.02 557 826 64.0
Product Performance
Fuel & Operational Flexibility
Fuel Rich & Lean NG, #2 dist, ASL
Startup Time (Hot) < 30 minutes
Turndown 25% GT base load
Ramp rate 15% GT MW/min
>300k hrs >2.0M hrs >500K hrs
>1.4M hrs
Over 15 years of operating experience with H-class technology
>120k hrs
© 2018, General Electric Company. Proprietary information. All rights reserved. 11
9HA.02 Industry-Leading Characteristics
� Leading in Performance MW & CC Efficiency
� Leading in operability Turndown & Ramprate
�Simplicity Integrated Cooling & Prime Package
GT Output 557MW
CC Output 826 MW (1x1), 1,658 MW (2x1)
25 ppm Nox @ 15% O2
Efficiency 64.0%-64.2%*
*CC operation, ISO, Net LHV
World’s largest, most efficient gas turbine in simple or combined cycle
* Catalog Ratings
© 2018, General Electric Company. Proprietary information. All rights reserved. 12
Technology Roadmap – Being delivered on the HA’s
Model & efficiency
62 ���� 63%
HA Today
63 ���� 64%
9HA.02
���� 65%
Micromixer Micro-channel
cooling
Cooled LSB
Advanced
Core/Castings
Ultra-Low k TBCAdvanced
sealing
Advanced
Combustion High Temp RotorHigh-temp
additive
Ceramic Matrix
Composites Unsteady aero
Technologies
Product Growth
4-stage turbine
Flowpath sealing
Turbine aero
14 stage 3D compressor
“Staged” combustion
Titanium S1 comp blade IN OPERATION
BEING MANUFACTURED
BEING DEVELOPED
>600C Steam
Portfolio of Material, Component and Systems Technologies – Available for new units and upgrades
Plant Solutions / Integrated Systems
© 2018, General Electric Company. Proprietary information. All rights reserved. 14
Faster, De-Risked Construction Schedule
� Critical path installation cycle shortened 8 weeks
� Labor reduced 13,000 hours
� Up to 25% faster installation than F-class
↓63% Field connections
↓55% Field welds
↓64% Electrical terminations
↓98% Field installed valves
Modular gas turbine approach – Simplifies site construction and unit maintenance
© 2018, General Electric Company. Proprietary information. All rights reserved. 15
E-Rooms
GCB, power transformers ...
Combined cycle steam turbines
HRSGs
Condensers
Bottoming cycle Mechanical BoP Electrical BoP
Pumps
1
5
GE Plant Equipment Portfolio
The GE store: World leading plant equipment portfolio all out of one hand
© 2018, General Electric Company. Proprietary information. All rights reserved. 16
Industry Leading Plant Capability Typical Reference Plant Concept (1x1 SS)
Baseline arrangement optimized for cost, constructability and maintenance
Fully through access in
turbine hall
Fully through access in
turbine hall
Optimized turbine hall footprint for
cost, and maintenance
Optimized turbine hall footprint for
cost, and maintenance
Low-shaft centerline elevation
& pier foundation
Low-shaft cent