facilities and processing engineer

Upload: virleenda-mega-setianingrum

Post on 30-May-2018

223 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/9/2019 facilities and processing engineer

    1/17

    CHEMICAL ENGINEERING

    Oil&gas

    geoscience

    surface

    subsurface

    manufacture mining Pemerintah

    BP MIGAS

    PERTAMINA

    e.g: ExxonmobileChevron

    Total

    Vico

    ,dsb

    7/1/2010 1virleenda_ui tekim 2008

  • 8/9/2019 facilities and processing engineer

    2/17

  • 8/9/2019 facilities and processing engineer

    3/17

    Ruang Lingkup & Job Desk

    memastikan produksi minyak dan gas

    bekerja secara baik dan optimal membuat program kerja maintenance

    tahunan

    punya terobosan berpikir untuk efisiensidan efektifitas peralatan produksi

    7/1/2010 3virleenda_ui tekim 2008

  • 8/9/2019 facilities and processing engineer

    4/17

    Program kerja maintenance tahunan salah

    satunya meliputi penjagaan peralatan dari

    HULU ke HILIR, yaitu

    Pompa minyak

    Fasilitas pengumpul (tangki) dan pemisah

    (separator) Fasilitas transportasi (kompresor, piping

    dengan system instrumentasi sebagaipengaman)

    7/1/2010 4virleenda_ui tekim 2008

  • 8/9/2019 facilities and processing engineer

    5/17

    Dasar ilmu FE :

    Paham proses P&ID (pipingand instrument diagram)

    Dapat membuat optimalisasiproduksi Migas

    7/1/2010 5virleenda_ui tekim 2008

  • 8/9/2019 facilities and processing engineer

    6/17

    Surfaceengineer

    (FE)

    Project engineer

    Operation engineer

    Contract engineer

    Reliability Construction

    Maintanence

    Subsurfaceengineer

    OIL and GAS

    7/1/2010 6virleenda_ui tekim 2008

  • 8/9/2019 facilities and processing engineer

    7/17

    Project engineer

    Ex/ American Oil & Gas Engineer

    1. Management experience

    - list off production related project managed

    *design and construction waterflood facilities

    *design and construction oil and gas

    production facilities

    7/1/2010 7virleenda_ui tekim 2008

  • 8/9/2019 facilities and processing engineer

    8/17

    2. Oil and Gas production facilities engineer

    experience:

    * waterflood facilities* watertreatment and disposal facilities

    * oil and gas treating and separating facilities

    * tank batteries, compressor station, storageterminal, pipelines and pump station

    7/1/2010 8virleenda_ui tekim 2008

  • 8/9/2019 facilities and processing engineer

    9/17

    Our HSE goals are continually monitored and reviewed annually and are

    communicated via WG Group HSE Plan.

    These are applied across the Group through locally adapted policies, procedures

    and management systems. HSE performance is also a key area of focus for our

    customers and our improvement initiatives are often implemented in conjunction

    with them - many of our principal contracts contain HSE goals as part of

    performance and reward mechanisms. Our 2009 HSE Plan is:

    Health

    Continue to improve the quality of occupational health management by:

    Controlling more effectively the health risks arising from our activities

    Promoting the benefit of healthy lifestyles for our employees via campaigns and

    health fairs

    Safety

    Reduce the number of injuries occurring across our business by:

    Using leading indicators to measure proactive performance

    Ensuring our personnel are properly inducted and trained Ensuring proper security and emergency response plans are in place and tested

    Combating complacency in routine activities by refresher campaigns on recurring

    black spots such as:

    manual handling

    driving

    7/1/2010 9virleenda_ui tekim 2008

  • 8/9/2019 facilities and processing engineer

    10/17

    Maintaining a focus on high risk areas such as:

    pressure equipment

    electrical safety

    lifting operations

    Improving Asset Integrity and Process Safety to

    mitigate the major hazards in each of our

    businesses

    Environment

    Continue to improve environmental management by:

    Encouraging the use of management systems

    aligned to ISO 14001

    Reporting on appropriate environmental indicators

    Evaluating work practices and processes that could

    adversely affect the environment

    Managing waste more efficiently

    Piloting carbon footprint measurement and

    reduction initiatives7/1/2010 10virleenda_ui tekim 2008

  • 8/9/2019 facilities and processing engineer

    11/17

    Production Engineer

    Drilling completion and workorvers

    Primary and enhance oil recovery

    Oil and gas reservoir evaluation

    7/1/2010 11virleenda_ui tekim 2008

  • 8/9/2019 facilities and processing engineer

    12/17

    7/1/2010 12virleenda_ui tekim 2008

  • 8/9/2019 facilities and processing engineer

    13/17

    Process Engineering

    implemented at all levels of design conceptual,F

    EEDand detailed design, to ensure that oil and gas

    equipment and systems are fit for purpose in terms of

    design, materials of construction, operability,

    availability, layout, etc.

    understanding of all process fluid characteristics suchas pressures, temperatures, volumes, pH, velocities,

    corrosion rates, acid gas contents, water content etc.,

    together with their interaction with plant equipment is

    an imperative.

    To check the validity of this complex combinationcomprehensive reviews and recommendations of

    P&IDs and UFDs, MSGs and MSDs (Process and

    Instrument Diagrams, Utility Flow Diagrams, Materials

    Selection Guides, Materials Selection Diagrams) are

    carried out.

    7/1/2010 13virleenda_ui tekim 2008

  • 8/9/2019 facilities and processing engineer

    14/17

    COMPETENCE

    Base

    I.-Sand Face Completion. To select and design the

    optimum drainhole and sandface configuration for a

    production or injection well by taking into consideration

    reservoir characteristics, geology and reservoir fluid

    content in order to optimize well performance over its life

    cycle to maximize Ultimate Recovery and NPV.

    Awareness

    1. Having knowledge on the different elements in a well

    completion design.

    2. Having realisation in which information is required to

    design a well completion and which tools to be used.

    3. Able to recognize what geological and petrophysical

    parameters affect successful completion design.

    4. Able to differentiate what are the challenges in

    designing for unconsolidated formations, thinly bedded

    reservoirs, tight sands, and fractured carbonates.

    7/1/2010 14virleenda_ui tekim 2008

  • 8/9/2019 facilities and processing engineer

    15/17

    Knowledge

    1. Able to stablish the data needed for a well completion design.

    2. Able to select suitable techniques to simulate the flow performance of a

    production/injection well and define the appropriate wellbore configuration.

    3. Able to integrate and relate respective completion component (liners,

    packers, seals, production equipment, etc) of the completion system and

    justify for selecting a final design configuration.

    Skill Level

    1. Has conducted sensitivity analysis on well flow model to define optimal

    perforation strategies and tubular sizes.

    2. Being involved in designing well and sand face completion systems

    including tubulars, equipment and accessories (sizes, connections,

    specifications, requirements, etc.) using nodal analysis, stress analysis and

    rock mechanical properties analysis.

    3. Able to make sound recommendations in well design for controlling

    borehole instabilities, corrosion problems and sand production.

    4. Has been involved in supervising the installation completion equipment

    and validating such installations.

    Advanced Level

    1 Leads and mentors teams in designing completion systems for new fields,

    and upgrading those in mature fields using cost-risk-benefit analysis tools.

    2. Teach others how to design a suitable completion system matching with

    field parameters

    3. Provide guidance in developing assessment criteria for selection oftechnology provider.

    7/1/2010 15virleenda_ui tekim 2008

  • 8/9/2019 facilities and processing engineer

    16/17

    production engineering itu adalah sub surface up to surface.

    sub surface reservoir, near well bore, ampe ke

    well , harus tau semua..

    surface harus bisa menguasai, masalah sand

    problem di surface juga, valve, compressor, separator danjuga flowline dan itu semua bisa di gabungkan ke network

    modeling and simulation ..kerennya.. network modeling

    optimization.

    7/1/2010 16virleenda_ui tekim 2008

  • 8/9/2019 facilities and processing engineer

    17/17

    DAF

    TAR PUSTAK

    A

    http://www.exponent.com/pipelines/#tab_overview

    http://www.youtube.com/watch?v=QP2GejkLdwA&feature=fvw

    http://www.youtube.com/watch?v=WPOi1WYTf2c&NR=1&feature=fvwphttp://www.kaskus.us/showthread.php?t=899212&page=51

    http://www.kaskus.us/showthread.php?t=899212&page=53

    7/1/2010 17virleenda_ui tekim 2008