UTILIZING EVERY WATER POTENSIAL IN LUWUK FOR

MINIMALIZE FUEL USAGE AN EFFORT TO SUPPORT 35.000

MW PROGRAM

PLN CONFERENCE 2016

PT. PLN (Persero) WILAYAH SULUTTENGGOAREA LUWUK

Page 2: Exploiting Every Water Potensial in Luwuk for Minimalize Ppt

LUWUK LUWUK KOTA

BERAIR

Page 3: Exploiting Every Water Potensial in Luwuk for Minimalize Ppt

Disusun Oleh :

AP2B SISTEM SULAWESI BAGIAN UTARA PLN Wil. SULUTTENGGO

PETA PEMBANGKITLuwuk-Toili

BATURUBE DM: 545 KwBP: 420 KwSUR: 125 Kw

SEWA WIC TOILI DM: 4.000 kW

SEWA KIPDM: 5.000 kW

HANGA-HANGADM: 650 kW

HANGA-HANGA 2DM: 3090 kW

KALUMPANGDM: 5.000 kW

PLTD LUWUKDM: 4.290 KwBP: 0 kWSUR: 4.290 kW

SEWA WIC LUWUKDM: 5.000 kW

LAMBANGANDM : 2.000 kW

SANSARINODM: 550 Kw

Hek 1 & 2DM: 2.350 kW

SEWA KIPDM: 2.000 kW

SINGKOYODM: 2.450KwBP: 1.440KwSUR:1.010 Kw

PLTM Batui

PLTM MendonoPLTM Òndo-ondolu

PLTM Alani

PLTM Biak

Page 4: Exploiting Every Water Potensial in Luwuk for Minimalize Ppt

Data Potensi Sungai

SatuanTitik koordinat S = 01°05,937' E = 122°40,493'Jarak sungai dari jalan raya Tracking Garis Lurus

6.12 5.3 kmLokasi ketinggian diatas permukaan laut 44 m

Kedalam 0,47 mlebar 16,8 mlaju aliran 0,565 m/s

Debit air (Q) 4,46 m3/sDaya yang Dihasilkan 1.348 kW

Parameter yang dianalisa Nilai

Data sungai

PLTM Mendono

PLTM BatuiSatuan

Titik koordinat S = 01°11,742' E = 122°29,346'Jarak sungai dari jalan raya Tracking Garis Lurus

12.72 11.42 kmLokasi ketinggian diatas permukaan laut 58 m

Kedalam 1,56 mlebar 28,5 mlaju aliran 1,428 m/s

Debit air (Q) 63,49 m3/sDaya yang Dihasilkan 8.408 kW

Data sungai

Parameter yang dianalisa Nilai

PLTM Ondo-ondoluSatuan

Titik koordinat S = 01°11,742' E = 122°29,346'Jarak sungai dari jalan raya Tracking Garis Lurus

10.6 7.1 kmLokasi ketinggian diatas permukaan laut 100 m

Kedalam 0,2 mlebar 2,5 mlaju aliran 3,100 m/s

Debit air (Q) 1,55 m3/sDaya yang Dihasilkan 1.368 kW

Parameter yang dianalisa Nilai

Data sungai

Potensi yang dapat dibangkitkan :

PLTM Mendono 1.348 kW

PLTM Batui 8. 408 kW

PLTM Ondo-ondolu 1.368 kW

Page 5: Exploiting Every Water Potensial in Luwuk for Minimalize Ppt

Support 35.000 MW ProjectManfaat dan Tujuan

Page 6: Exploiting Every Water Potensial in Luwuk for Minimalize Ppt

Series121.5

22

22.5

23

23.5

24

24.5

Rasio Pertumbuhan Pelanggan Tahun 2015 –

2016 (MW)

Tahun 2015 Tahun 2016

11 %

Page 7: Exploiting Every Water Potensial in Luwuk for Minimalize Ppt

Kondisi Kelistrikan Sistem Luwuk - Toili

Page 8: Exploiting Every Water Potensial in Luwuk for Minimalize Ppt

Dampak yang dihasilkan

Page 9: Exploiting Every Water Potensial in Luwuk for Minimalize Ppt

Analisa Susut Jaringan

SIZE TYPE

1 PLTM Batui 8,408 10000 10,6 20 240 AAACS 80% 0,13

2 PLTM Mendono 1,348 2000 6,1 20 150 AAACS 80% 1,87

3 PLTM Ondo-Ondolu 1,368 2000 12,7 20 150 AAACS 80% 1,39* calculated with ETAP 7,5,0

BASE LOAD LOSESSCABLE

NO. POWER PLANEPOWER

CAPACITY

STEP UP TRANSFORMER

(kVA)

SYSTEM NETWORK (kV)

DISTANCE(km)

Page 10: Exploiting Every Water Potensial in Luwuk for Minimalize Ppt

SavingSaving Satuan

Penghematan Pemakaian bahan bakar 1.000.184 Liter82 Buah

Penghematan Pengadaan Minyak Pelumas MED. SX 15W-40 (22.400 rupiah/liter) PLTD Toili /bulan 3 DrumPenghematan Pengadaan Minyak Pelumas MED. SAE 40 (20.150 rupiah/liter) PLTD Luwuk /bulan 3 DrumPenghematan Pengadaan Air Isi Ulang PLTD Singkoyo 838 Liter

Detail

Penghematan pengadaan filter rutin PLTD Luwuk dan PLTD Singkoyo

Page 11: Exploiting Every Water Potensial in Luwuk for Minimalize Ppt

Gain BBMPrice Satuan

Harga Keekonomian BBM Periode II (15 s/d 30) Nopember 2015 5.437 RupiahPemakaian Bahan Bakar sebelum adanya PLTMH (1.762.934 Liter) / bulan 9.585.072.158 RupiahPemakaian Bahan Bakar sebelum adanya PLTMH (762.750 Liter) / bulan 4.147.071.750 Rupiah

5.438.000.408 RupiahGain

Detail

Page 12: Exploiting Every Water Potensial in Luwuk for Minimalize Ppt

Gain Non BBMPrice Satuan

225.770.717 RupiahBiaya Pengadaan Minyak Pelumas MED. SX 15W-40 (22.400 rupiah/liter) PLTD Toili /bulan 67.200 RupiahBiaya Pengadaan Minyak Pelumas MED. SAE 40 (20.150 rupiah/liter) PLTD Luwuk /bulan 60.450 RupiahBiaya Angkut Minyak pelumas 221.054 RupiahBiaya Pengadaan Air Isi Ulang PLTD Singkoyo 1.117.895 Rupiah

227.237.316 Rupiah

DetailBiaya operasional pengadaan filter rutin PLTD Luwuk dan PLTD Singkoyo

Gain

Total Gain Perbulan : Rp 5.665.237.724

Page 13: Exploiting Every Water Potensial in Luwuk for Minimalize Ppt

Benefit• Pengoptimalan Kinerja (KPI) PLN Area Luwuk dalam hal

saving BBM yang dapat dialokasikan untuk biaya operasional pembangkitan

• Pengoptimalan kinerja (KPI) PLN Area Luwuk yang terkait dalam pemakaian BBM serta Fuel Mix

• Mengurangi jam operasi PLTD, sehingga biaya operasional dan pemeliharaan dapat ditekan.

Page 14: Exploiting Every Water Potensial in Luwuk for Minimalize Ppt

TERIMA KASIH

ENERGI PRIMER & EBT