VOLUMEPT. SOLO KEBUMEN SEJAHTERAJalan Martadinata 68, Jebres, Surakarta, Jawa tengahTelepon :(0271)628133Email: [email protected]

PERHITUNGAN VOLUME PEKERJAAN

A. PEKERJAAN PERSIAPAN

NO ITEM PEKERJAANVOLUME1PEMBERSIHAN LAHANPembersihan dilakukan pada tanah yang akan dikerjakan dengan penambahan 1.5 m dari as terluar

L=panjang x lebar(20+1.5+1.5) x (14+1.5+1.5)=391m2

2PEMASANGAN PAGAR SEMENTARAPagar dibuat mengelilingi lokasi pekerjaan

=(20+14)x2=68m

3PEMASANGAN BOUPLANKPemasangan Bouplank=12+12+3+3+3+3+2+14+12+12+4+4+3+3+5=95m

B. PEKERJAAN TANAH

NO ITEM PEKERJAANVOLUME1GALIAN TANAH FONDASI

A.Pondasi Batu KaliB1=1.00mB2=1.6mt=1.20mP=84.00m(PANJANG TOTAL)Volume = B2 x t x P=161.28Volume Galian =161.28m3

B.Pondasi TerasB=0.7mt=0.70mP=9.00m(PANJANG TOTAL)Volume = B x t x P=4.41Volume Galian =4.41m3

C.Pondasi Foot Plat 1 x 1Luas galian 1 pondasi foot plat type F1P=1.10mL=1.10mLuas= P x L =1.1 x 1.1=1.21m2t=2.00mBanyaknya26unitVolume = P x L x t=1.2 x 1.2 x 2.55=2.42m3Volume Galian 62.92m3

2URUGAN TANAH KEMBALIA.Pondasi Batu KaliPondasi batu kalivolume galian=161.28Luas Terisi = Luas pon.batukali + luas sloofLuas sloof=0.15 x 0.2m2=0.05m2Luas pondasi batu kali=((0.3+0.8)x0.5x0.8))+(1+1.15)/2 *0.3=0.61m2Luas yang terisi=0.66m2Volume Yang terisi=0.79m3Volume urugan Batu Kali=160.49m3

B.Pondasi Terasvolume galian=4.41m3Luas Terisi = Luas pon. Bata + Aanstamping + pasir urug Luas pon. Bata + Aanstamping + pasir urug=(0.3 x 0.4) + (0.7 x 0.3)=0.33m2Luas yang terisi=0.33m2Volume Yang terisi=2.97m3

Volume urugan Batu Kali=1.44m3

C.Pondasi Foot Plat 1 x 1Pondasi Foot plat type F1volume galian=62.92m3Volume foot plat=(((1 x 1)x0.4)+(0.3 x 0.3 x 1.45) + (1.1 x 1.1 x 0.2)) x 26=20.09m3Volume urugan foot plat=42.84m3

Volume urugan Foot Plat 1.2 x 1.2=42.84m3

3URUGAN PASIR BAWAH PONDASI

A.Urugan pasir pondasi foot plat 1 x 1Volume = Volume 1 pondasi*banyak pondasiVolume 1 pondasi ;=0,1x1,10x1,10=0.18m3Volume 26 pondasi :=4.72m3Volume Urugan Pasir Footplat =4.72m3

B.Urugan pasir pondasi terasVolume urugan pasir ;=0.7 x 0.1 x 9=0.63m3Volume Urugan Pasir Pondasi Teras=0.63m3

C.Urugan pasir pondasi batu kaliVolume urugan pasir ;=(1.05 + 1)/2 x 0.1=8.61m3

Volume Urugan Pasir Pondasi Batu Kali=8.61m3

C. PEKERJAAN PASANGAN PONDASI

NO ITEM PEKERJAANVOLUME1Pasang pondasi batu kosong (anstamping)A. Anstamping Pondasi batukaliB1=1.05m

B2=1.15mt=0.20mP=84.00m(PANJANG TOTAL)Volume = =0.5x(1.05+1.15)x0.2x84Volume Anstamping Pondasi batukali=18.48m3

B.Anstamping Pondasi TerasB=0.70mt=0.20mP=9.00m(PANJANG TOTAL)Volume = =0.7 x 0.2 x 9=1.26m3Volume Anstamping Pondasi Teras=1.26m3

2Lantai Kerja Pondasi Foot platL=1.10mt=0.10mN=26bhVolume = =1.1 x 0.1 x 26Volume Anstamping Pondasi Foot Plat=2.86m3

3Pasang pondasi batu kali 1 Pc: 5 Ps A. Pondasi Pasangan Batu KaliB1B2=0.80mt=0.30mP=0mVolume = =(( 0.8 + 0.3 ) / 2) X 0.8 X 84=36.96m3Volume Pasangan Pondasi Batu Kali =36.96m3B. Pondasi Pasangan BatuB=0.30mt=0.45mP=9.00m(PANJANG TOTAL)Volume = =0.3 x 0.45 x 9=1.22m3Volume Pasangan Batu=1.22m3

4Pondasi Foot PlatB1=1.00mB2=0.30mt1=0.40mt2=1.45N=26.00BuahVolume = =((1 x 1) x 0.4) + ( (0.3 x 0.3) x 1.45 )=13.79m3Volume Pondasi Foot Plat=13.79m3

D. PEKERJAAN DINDING DAN PLESTERAN

NO ITEM PEKERJAANVOLUME1Pasang bata merah tebal 1/2 bata, 1 Pc : 5 Ps : 10Psr

A. Dinding LT.1Luas=Luas Dinding -(Luas pintu+Luas jendela+Luas ventilasi)L. Dinding=(4x89)=356.00m2L. Pintu Utama=1.45 x 2.4 x 1=3.48m2L. Pintu 1=0.9 x 2.32 x 3=6.26m2L. Pintu 2=2.15 x 1 x 5=10.75m2L. Pintu Garasi=2.8 x 3.2=8.96m2L. J1=1.35 x 1.2 x 2=3.24m2L. J2=0.7 x 1.2 x 7=5.88m2L. BV=0.5 x 0.4 x 2=0.40m2L. Dinding=317.03m2Luas Pasangan Dinding LT.1=317.03m2Jumlah batu bata lantai 1=luas pasangan dinding / ( 2.05x2.22)=26419bata

B. Dinding LT.2Luas=Luas Dinding - (Luas pintu+Luas jendela+Luas ventilasi)L. Dinding=(4x86)=344.00m2L. Pintu 1=0.9 x 2.32 x 4=8.35m2L. Pintu 2=2.15 x 1 x 4=8.60m2L. J1=1.35 x 1.2 x 2=3.24m2L. J2=0.7 x 1.2 x 5=4.20m2L. BV=0.5 x 0.4 x 2=0.40m2L. Dinding=319.21m2Luas Pasangan Dinding LT.2=319.21m2Jumlah batu bata lantai 2=luas pasangan dinding / ( 2.05x2.22)=26601bata2Plesteran 1 Pc : 5Ps, tebal 12 mmLT.1=317.03m2LUAS = 2 x Luas dinding=634.05m2

LT.2=319.21m2LUAS = 2 x Luas dinding=634.05m2

3Pekerjaan AcianLT.1=317.03m2LUAS = 2 x Luas dinding=634.05m2

LT.2=319.21m2LUAS = 2 x Luas dinding=638.42m2

E.PEKERJAAN BETON

NO ITEM PEKERJAANVOLUME1BETON TUMBUK 1 Pc : 2 Ps : 3 KrL. Lantai 1=130m2Tebal=0.05m

Volume Beton=Luas x tebal=6.5m3

2SLOOF STRUKTUR (20/25)Panjang sloof=88.0m'Volume sloof 0,30*0,4*88 =10.56m6 D 19 mm6*90*2,23 kg/m =1204.20kg 8 - 150 mm(90/0,15)*0,6*1 kg/m =360.0kgJumlah =1564.20kg

Volume tulangan per m beton=148.13kg/mVol. Begesting0,20*90*2 sisi=36.00mVolume bekisting per m beton36/4,4=3m

3KOLOM LT.I dan LT.2Tinggi kolom=8.00m'Jumlah kolom=30bhVolume beton = 0,3*0,3*8*30 bh=21.60m6 D 22 mm =6*7,3*2,98 kg/m*38 bh=4291.20kg 8 - 150 mm= (7,3/0,15)*2,40*1,2 kg/m' =153.60kgJumlah=4444.80kg

Volume tulangan per m beton=205.78kg/mBekisting0,20*8*30*4 sisi =192.00mVolume bekisting per m beton=8.89m

4PLAT A. Plat LantaiTebal plat lantai=0.12m'Jumlah=1bhLuas lantai=130.00mVolume plat lantai=0,120*130=15.60m 8 - 20012,00*(12,00/0,20)2*1*0,40 kg ==576kg= 4,00*(15,00/0,20)2*1*0,40 kg ==240kgJumlah=816kg

Volume tulangan per m beton= 1536/12,9652.31kg/m

Bekisting= 0,12*27*2 sisi=6.48m= 0,12*4*2 sisi=0.96mJumlah=7.44mVolume bekisting per m beton= 7,44/12,96=0.48m

10,00*(15,00/0,20)2*1*0,40 kg ==576kgJumlah=576kg

Volume tulangan per m beton576/15,6036.92kg/m

Bekisting0,12*12*2 sisi=2.88m0,12*10*2 sisi=2.40mJumlah=5.28mVolume bekisting per m beton5,28/15,6=0.34m

5BALOK STRUKTUR A. Balok Induk (30/40)Panjang balok=90m'Volume beton0,3*0,4*90 m=10.8m6 D 22 mm6*3,85 kg/m*90 m =2079kg 8 - 150 mm(90/0,15)*2,40*1,40 kg/m=2016kgJumlah=4095kgvolume tulangan per m beton=379.1667kg/m

Bekisting 0,15*90*2 sisi =27m 0,25*90*2 sisi=45mJumlah=72mvolume bekisting per m beton=6.667m

B. Balok Anak (20/30)Panjang balok=19m'Volume beton0,10*0,20*19 m=1.14m4 D 22 mm4*3,85 kg/m*19 m =292.6kg 8 - 150 mm (19/0,15)*2,40*1 kg/m =304kgJumlah=596.6kg

Volume tulangan per m beton596,6/0,38=523kg/mBekisting0,1*19*2 sisi =3.8m0,2*19*2 sisi =11.4mVolume bekisting per m beton=13mC. Ring Balk (20/30)Panjang balok=90m'Volume beton0,2*0,3*90 m=5.4m4 D 22 mm4*3,85 kg/m*90 m =1386kg 8 - 150 mm(90/0,15)*2,40*1 kg/m =1440kgJumlah=2826kgVolume tulangan per m beton=523.333kg/mBekisting0,15*90*2 sisi =27m0,20*90*2 sisi =36.00m63.00mvolume bekisting per m beton=23.33m

6TANGGADIMENSI TANGGATinggi Anak Tangga=0.18Lebar Anak Tangga=0.25Panjang Anak Tangga=1.25Banyak Anak Tangga=20.00Panjang Sisi Miring=13.79Tebal Tangga=0.15Volume Anak Tangga = P x L x t x N=3.68m3Volume Beton =3.68m3F. PEKERJAAN KUSEN PINTU DAN JENDELA

NO ITEM PEKERJAANVOLUME1Pasang Kusen Pintu, Jendela, Ventilasi, bouven kayu kamfer

A. Kusen Pintu UtamaPanjang=2.4mLebar=1.50mBanyaknya=1unitPanjang Kusen Pintu=2 x 1.5 + 2.4 x 2 =7.8mVolume=0.06m3Balok kayu 6/12Volume Kayu Total (+10%)=0.06m3

B. Kusen Pintu P1Panjang=2.3mLebar=0.90mBanyaknya=7unitPanjang Kusen Pintu=2 x 2.3 + 0.9 x 2=6.4mVolume=0.32m3Balok kayu 6/12Volume Kayu Total (+10%)=0.35m3

C. Kusen Pintu P2Panjang=2.16mLebar=1.00mBanyaknya=9unitPanjang Kusen Pintu=2 x 2.16 + 1=9mVolume=0.58m3Balok kayu 6/12Volume Kayu Total (+10%)=0.64m3

D. Kusen Jendela J1Panjang=1mLebar=1.35mBanyaknya=12unitPanjan Kusen Jendela=2 x 1+0.1x4+2x1.35=5.50mVolume=0.48m3Balok kayu 6/12Volume Kayu Total (+10%)=0.52m3

E. Kusen Jendela J2Panjang=1mLebar=0.60mBanyaknya=14unitPanjang Kusen Jendela=2 x 1+0.1x4+2x0,6=4.00mVolume=0.40m3Balok kayu 6/12Volume Kayu Total (+10%)=0.44m3

F. Kusen Boven BV 1Panjang=0.40mLebar=0.50mBanyaknya=4unitPanjang Kusen BV=2 x 0.4+ 2 x 0,5+ 4 x 0,5=2.20mVolume=0.06m3Balok kayu 6/12Volume Kayu Total (+10%)=0.07m3

G. Kusen Boven Ventilasi

Panjang=0.26mLebar=0.26mBanyaknya=64unitPanjang Kusen Pintu=2 x 0.26+ 2 x 0,5+ 4 x 0,26=1.44mVolume=0.66m3Balok kayu 6/12Volume Kayu Total (+10%)=0.73m3

G. PEKERJAAN DAUN PINTU DAN JENDELA

NO ITEM PEKERJAANVOLUME1Pekerjaan Daun Pintu A. Daun Pintu Utama

Tebal Kayu=0.03mPanjang=2.10mLebar=0.70mLuas=1.47m2Jumlah Daun Pintu=2bhLuas Total=2.94m2Volume Total=0.09m3Volume Kayu Daun Pintu Total (+10%)=0.10m3B. Daun Pintu P1Tebal Kayu=0.80mPanjang=2.10mLebar=0.80mLuas=1.68m2Jumlah Daun Pintu=7bhLuas Total=11.76m2Volume Total=9.41m3Volume Kayu Daun Pintu Total (+10%)=10.35m3C. Daun pintu P2Tebal Kayu=0.85mPanjang=2.10mLebar=0.92mLuas=1.93m2Jumlah Daun Pintu=9bhLuas Total=17.39m2Volume Total=14.78m3Volume Kayu Daun Pintu Total (+10%)=16.26m32Pekerjaan Daun JendelaA. Jendela J1Tebal Kaca=0.05mPanjang=1mLebar=1.00mLuas=1.00m2Jumlah Daun Jendela=12bhLuas Total=12.00m2Volume Total=0.60m3Volume Kayu Daun Jendela Total (+10%)=0.66m3

B. Jendela J2Tebal Kaca=0.05mPanjang=1mLebar=0.50mLuas=0.50m2Jumlah Daun Jendela=14bhLuas Total=7.00m2Volume Total=0.35m3Volume Kayu Daun Jendela Total (+10%)=0.39m3

3Pasang Kaca Mati Tebal 5 mmA. Jendela J1Tebal Kaca=0.05mPanjang=1mLebar=1.00mLuas=1.00m2Jumlah Daun Jendela=12bhLuas Total=12.00m2Volume Total=0.60m3Kebutuhan Kaca=16.22m2Volume Kayu Daun Jendela Total (+10%)=0.66m3

B. Jendela J2Tebal Kaca=0.05mPanjang=1mLebar=0.50mLuas=0.50m2Jumlah Daun Jendela=14bhLuas Total=7.00m2Volume Total=0.35m3Kebutuhan Kaca=9.46m2Volume Kayu Daun Jendela Total (+10%)=0.39m34Pekerjaan AngkerP1=7 x 428UnitP1=9 x 436UnitJ1=12 x 448UnitJ2=14 x 456UnitBV1=4 x 416UnitVentilasi=64 x 4256UnitTOTAL440Unit=16=1.58Kg/mPanjang Baut Angker=0,1 + 0,05m=0.15mBerat 1 buah angker = 0,15 x 1,58=0.237KgVolume=0,237 x 444=104.28KgH. PEKERJAAN PENGGANTUNG ATAU PENGUNCI

NO ITEM PEKERJAANVOLUME / JUMLAH1Pasang Kunci Silinder=17buah

2Pasang Engsel Pintu=34buah

3Pasang Engsel Jendela=52buah

4Pasang Grendel Jendela=26buah

I. PEKERJAAN LANTAI DAN DINDING KERAMIKNO ITEM PEKERJAANVOLUME / JUMLAH1Memasang Lantai Keramik 30 x 30 cmA. Keramik 30x30 Lantai 1Luas=(3x4x8) + (6 x 5)=126.00m2

Jumlah=Luas : 0.16=787.50buah

B. Keramik 30x30 Lantai 2Luas=(3x4x8)=96.00m2

Jumlah=Luas : 0.16=600.00buah

2Memasang 1 Lantai Keramik 20x20 cmA. Keramik 20 x 20 kamar mandi Lantai 1Luas=(1,6x2x16)+(8x2x1)=67m2

Jumlah=Luas : 0.12=560buah

B. Keramik 20 x 20 kamar mandi Lantai 2Luas=(1,6x2x16)+(8x2x1)=67m2

Jumlah=Luas : 0.12=560buah

3Memasang Dinding Keramik 20x20 cm,Luas=1.5x13.08x2=39.24m2

J. PEKERJAAN PLAFONNO ITEM PEKERJAANVOLUME / JUMLAH1Pasang Plafond GypsumLuas Lt. 1=(13x 3) + (12 x 7) - ( 2 x 3)=117.00m2

Jumlah=Luas : 2.88=41buah

Luas Lt. 2=(13+2)x(3+1) + (7+1)x(12+2) + (1x1)=173.00m2

Jumlah=Luas : 2.88=61.00buah

2Memasang Rangka Langit-langit Luas Lt. 1=(13x 3) + (12 x 7) - ( 2 x 3)=117.00m2

Jumlah=Luas : 2.88=41buah

Luas Lt. 2=(13+2)x(3+1) + (7+1)x(12+2) + (1x1)=173.00m2

Jumlah=Luas : 2.88=61.00buah

3Memasang List Plafond Gypsum MotifLantai 11 Gudang + 2 Kamar Mandi=3x(2x4)m=24m3 Kamar Tidur=(4x2)+(3x2)+(3x4)+(4x2)+(3x2)m=40m1 Teras + 1 Dapur + 1Garasi=(3x1)+(2x2)+(3x1)+(1x4)+(7x1)m+(2x1)+(6x1)+(4x1)+(1x3)36Panjang=100m

Lantai 2Lantai 1 + atas tangga - (3x1)=100+(3x2)+(2x1)-(3x1)mPanjang=105m

K. PEKERJAAN INSTALASI LISTRIK

NO ITEM PEKERJAANVOLUME / JUMLAH1Pekerjaan Instalasi Titik Lampu

A. Instalasi Stop Kontak 40 W=16buah

B. Instalasi Titik LampuLampu 1 TL 25 W=9buah ( DownLight )Lampu 2 TL 20 W=9buahLampu 3 TL 8 W=4buahLampu Taman 25 W=2buah

C. Instalasi Titik Lampu=2.00buah( Lampu Taman )

D. Fitting=24buah

2Pekerjaan Instalasi Titik SaklarA. Instalasi SaklarSaklar Tunggal=10buahSaklar Ganda=7buah

3Fuse Box=1buah

4Penyambungan Daya PLN=1buah( 900 W 220 Voltage )

5Kabel NYY 2x4Lantai 1=79.38mLantai 2=69.52mBidang vertikal=2 x (titik saklar/steker)=66.00mTotal=214.90mPanjang kabel + jagaan kabel untuk sambungan (10%)Total + 10%=236.39m

L. PEKERJAAN ATAP DAN PENUTUP ATAP

NO ITEM PEKERJAANVOLUME1Penutup Atap Genteng Keramik

A. Atap genteng

LUAS 1 (L1)P=6.9282m( SISI MIRING )L1=2.00mL2=14.00mLuas=0.5*(L1+L2) *P *2m2=110.85m2

LUAS 2 (L2)P=6.9282m( SISI MIRING )L=12.00mLuas=0.5*L*P *2m2=83.14m2

LUAS 3 (L3)P=2.8868m( SISI MIRING )L=1.00mLuas=L*P *2m2=5.77m2

2Pasang Rangka Atap Genteng Keramik

A. GORDING(8 / 12)DIMENSI GORDING 8 cm x 12 cmP=76.00mTOTALVOLUME ;=0.7296m3B. USUKDimensi Usuk 4 cm x 6 cmP=4.00mtotal usuk =Luas Atap / ((lebar usuk+jarak antarusuk) *panjang usuk)=89.00UnitDibulatkan95.00Volume Usuk=0.91m3

C. RENGDimensi Reng 2 cm x 3 cmP=3.00mtotal usuk =Luas Atap / ((lebar usuk+jarak antarusuk) *panjang usuk)=290.00UnitDibulatkan300.00Volume Reng=2.16m3

3LisplangDimensi Lisplang 2 cm x 20 cmP=54.00mVolume Lisplang=0.22m34TalangPAPANA.Papan tegak (0,20*0,02)P=4.55mV=0.02m3B.Papan tegak (0,20*0,03)P=4.55mV=0.02m3TOTAL=0.04m3

C.SENG PELAPISP=4.55mLUAS=1.82m2

5Perencanaan Kuda KudaBentang Kuda-kuda=10.00m'Menggunakan kayu 8/12 =Jumlah kuda-kuda=3.00bhVolume=0.08 x 0.12 x( 10+(1.74x4)+(2.65x2)+4+1.2+(5.8x2))x 3=1.12m3Menggunakan kayu 8/12 =Balok pengunci=0.50m'=12.00bh=0.08 x 0.12 x 0.50 x 12=0.06m3

Total Volume Kuda-Kuda Kayu=1.18m3

M. PEKERJAAN CAT DAN LAIN - LAIN

NO ITEM PEKERJAANVOLUME1PENGECATAN DINDING (TOTAL)LUAS DINDING =(L. Dinding lt.1 + L. Dinding lt.2 )

=1268.10m2

2PENGECATAN KUSEN, DAUN PINTU,LIS TEPI PLAFON

A. KOSENP1LUAS = (0,06*2+0,12)*PANJANG KOSEN=1.87m2VOLUME = LUAS *JUMLAH KOSEN=1.87m2

P2LUAS = (0,06*2+0,12)*PANJANG KOSEN=1.54m2VOLUME = LUAS *JUMLAH KOSEN=10.75m2

P3LUAS = (0,06*2+0,12)*PANJANG KOSEN=2.16m2VOLUME = LUAS *JUMLAH KOSEN=19.44m2

J1LUAS = (0,06*2+0,12)*PANJANG KOSEN=1.32m2VOLUME = LUAS *JUMLAH KOSEN=15.84m2

J2LUAS = (0,06*2+0,12)*PANJANG KOSEN=1.68m2VOLUME = LUAS *JUMLAH KOSEN=23.52m2

BV 1LUAS = (0,06*2+0,12)*PANJANG KOSEN=0.53m2VOLUME = LUAS *JUMLAH KOSEN=2.11VentilasiLUAS = (0,06*2+0,12)*PANJANG KOSEN=0.06m2VOLUME = LUAS *JUMLAH KOSEN=3.99m2

N.PEKERJAAN SANITASI DAN DRAINASE

NO ITEM PEKERJAANVOLUME1KOLOSET DUDUKJUMLAH=3.00BUAH2KRAN AIRJUMLAH=15.00BUAH3SEPTCTANKJUMLAH=2.00BUAH4BAK MANDIJUMLAH=3.00BUAH5FLOOR DRAINJUMLAH=10.00BUAH6WASTAFELJUMLAH=1.00BUAH7BAK CUCI STAINLESJUMLAH=2.00BUAH8SALURAN PEMBUANGANA. Pipa PVC 2' (untuk air hujan)Panjang=45.00mB. Pipa PVC 2' (untuk air kotor wastafle)Lantai 1Panjang=25.00mLantai 2Panjang=4.00mPipa vertikalPanjang=10.00m

Total=39.00m

9Pipa PVC 3' (untuk air kotor padat)Lantai 1Panjang=22.00mLantai 2Panjang=6.00mPipa vertikalPanjang=10.00m

Total=38.00m

10SALURAN AIR BERSIHDengan pipa PVC 2"Lantai 1Panjang=20.00mLantai 2Panjang=10.00mPipa vertikalPanjang=0.00m

Total=30.00m11POMPA AIRJUMLAH=1.00BUAH

Surakarta, 8 Oktober 2013PT. SOLO KEBUMEN SEJAHTERA, Tbk

FAISHAL SHIDDIQ PRASETYO, S.T, M.EngDirektur Utama

Bahan 2013PT. ARCI PROPERTYJalan Martadinata 68, Jebres, Surakarta, Jawa tengahTelepon :(0271)628133Email: [email protected]

D A F T A R H A R G A S A T U A N B A H A N B A N G U N A N

S U M B E R D A T A:P A S A R A N B E B A SD A E R A H:KOTA SEMARANGEDISI Maret 2013

HARGA HPSHARGA STANDAR MARET 2013NO. J E N I S B A H A NSATUANMINIMUM MAKSIMUMKETERANGANMINIMUM MAKSIMUMRATA-RATA(Rp)(Rp)(Rp)(Rp)(Rp)

15IB A H A N D A S A R1BATU KALIBulat Utuhm3125,000125,000120,000130,000125,000Bulat Belahm3150,000150,000140,000160,000150,000Pecah 10/15m3160,000160,000150,000170,000160,000Pecah 5/7m3165,000165,000160,000170,000165,000Pecah 3/5m3157,500157,500150,000165,000157,5002KERIKILTimbunm3105,000105,000100,000110,000105,000Sawur / Koralm3185,000185,000170,000200,000185,000Beton0,5/1m3205,000205,000200,000210,000205,000Beton,1/2m3190,000190,000180,000200,000190,000Beton,2/3m3185,000185,000180,000190,000185,000Biasam3127,500127,500120,000135,000127,500Tras Gilingm3210,000210,000205,000215,000210,0003BATU BATAex lokalbh460460430490460.00

4PASIRUrug m3117,500117,500110,000125,000117,50025000Pasangm3135,000135,000120,000150,000135,000Betonm3202,500202,500195,000210,000202,5005TANAHPadasm355,00055,00050,00060,00055,000Liatm347,50047,50040,00055,00047,5006KAPURPasangm3217,500217,500210,000225,000217,500Semen Merahm3160,000160,000150,000170,000160,0007PORTLAND CEMENTHolcim - 40 KGzak50,25050,25049,50051,00050,250Holcim - 50 KGzak61,00061,00060,00062,00061,000Cibinong - 40 kgzak50,25050,25050,00050,50050,250Cibinong - 50 kgzak62,00062,00060,00064,00062,000Semen Putih 40 kgzak74,50074,50072,00077,00074,500Semen Putih 50 kgzak82,50082,50080,00085,00082,500Semen warnakg10,80010,80010,00011,60010,800

IIB A H A N P E N U T U P A T A P

1SIRAP(100 lbr)pak165,000165,000160,000170,000165,000

2GENTENG BETONGenteng Beton Warna standardbh4,1004,1004,0004,2004,100Genteng Beton Warna Specialbh4,8504,8504,7005,0004,850Genteng Beton Warna Khususbh5,3505,3505,2005,5005,350Kerpus Beton Warna Standardbh5,6005,6005,5005,7005,600Kerpus Beton Warna Specialbh6,1006,1006,0006,2006,100Kerpus Beton Warna Khususbh9,5009,5009,00010,0009,5003GENTENG TANAH LIATVlaambh1,4001,4001,3001,5001,400Kodokbh2,3502,3502,2002,5002,350Kodok Glasurbh3,6003,6003,5003,7003,600Nok kerpus Kodokbh6,0506,0505,9006,2006,050Nok kerpus Kodok Glasurbh7,7507,7507,5008,0007,750Plentong super besar 18 bh/m2bh4,2504,2504,0004,5004,250Nok kerpus plentong superbh8,3508,3508,2008,5008,3504GENTENG KACAVlaam tebal 2 mmbh9,2509,2509,0009,5009,250Vlaam tebal 3 mmbh11,75011,75011,50012,00011,750Kodok tebal 2 mmbh9,7509,7509,50010,0009,750Kodok tebal 3 mmbh12,25012,25012,00012,50012,250

5ASBES GELOMBANG BESARDjabes 6 1/2 . 200 cm X 102 cm X 5 mmbh73,50073,50072,00075,00073,500 . 250 cm X 102 cm X 5 mmbh81,00081,00080,00082,00081,000 . 225 cm X 102 cm X 5 mmbh77,00077,00076,00078,00077,000 . 200 cm X 102 cm X 6 mmbh71,00071,00070,00072,00071,000 . 225 cm X 102 cm X 6 mmbh83,50083,50082,00085,00083,500 . 250 cm X 102 cm X 6 mmbh87,50087,50085,00090,00087,500

Djabes 14 (Asbes Gelombang Kecil) . 150 cm X 105 cm X 4 mmbh41,75041,75040,50043,00041,750 . 180 cm X 105 cm X 4 mmbh49,50049,50048,00051,00049,500 . 210 cm X 105 cm X 4 mmbh58,00058,00056,00060,00058,000 . 240 cm X 105 cm X 4 mmbh66,00066,00064,00068,00066,000 . 270 cm X 105 cm X 4 mmbh74,50074,50072,00077,00074,500 . 300 cm X 105 cm X 4 mmbh82,50082,50080,00085,00082,500Onduline95 cm X 200 cm X 3 mmlbr0.0belum PPn0.0Ondovilla40 cm X 106 cm X 3 mmlbr0.0belum PPn0.0

6ASBES PLAT Jabes Plat . 100cm X 100 cm X 3 mmbh16,50016,50016,00017,00016,500

. 100cm X 100 cm X 4 mmbh18,75018,75018,00019,50018,750

. 50 cm X 200 cm X 3 mmbh13,00013,00012,50013,50013,000 . 40 cm X 200 cm X 3 mmbh13,00013,00012,50013,50013,000Gyproc unt dinding120 cm X 240 cm X 12 mmlbr0.00.0Belum PPn0.0/ plafond120 cm X 240 cm X 9 mmlbr0.00.0Belum PPn0.0

Jabes nok . Kerpus Gentengbh26,00026,00025,00027,00026,000 . Stel Besar bh45,75045,75045,00046,50045,750 . Paten Besarbh43,50043,50043,00044,00043,500Nokstel gelombang harflex . Stel Besar bh43,25043,25041,50045,00043,250 . Patent Besarbh21,75021,75021,00022,50021,750 . Plat besar bh50,00050,00049,00051,00050,000Onduline50 cm X 90 cm X 3 mmbh0.0Belum PPn0.07FIBRE GLASS (JABES) 180 X 92 cmbh40,50040,50036,00045,00040,500 200 X 92 cmbh45,50045,50042,00049,00045,500 250 X 92 cmbh52,50052,50048,00057,00052,500 180 X 105 cmbh54,50054,50052,00057,00054,500 210 X 105 cmbh67,25067,25066,50068,00067,250 250 X 105 cmbh76,50076,50076,00077,00076,5008SENG PLATBJLS 0,18 lebar 55 cmm'23,50023,50022,00025,00023,500BJLS 0,20 lebar 55 cmm'27,50027,50027,00028,00027,500BJLS 0,28 lebar 55 cmm'35,50035,50035,00036,00035,500BJLS 0,30 lebar 55 cmm'41,00041,00040,00042,00041,0009SENG GELOMBANGBJLS 0,18 panjang 180 cmlbr54,50054,50052,00057,00054,500BJLS 0,20 panjang 180 cmlbr58,50058,50057,00060,00058,500BJLS 0,30 panjang 180 cmlbr66,00066,00065,00067,00066,000BJLS 0,40 panjang 180 cmlbr74,00074,00073,00075,00074,000

III . B A H A N K A Y U1JATIPapanm321,500,00021,500,00021,000,00022,000,00021,500,000Balok/pesagenm319,750,00019,750,00019,500,00020,000,00019,750,000

2KAMPERPapanm37,400,0007,400,0007,300,0007,500,0007,400,000Balok/pesagenm36,900,0006,900,0006,700,0007,100,0006,900,000

3KRUINGPapanm35,200,0005,200,0005,000,0005,400,0005,200,000Balok/pesagenm35,100,0005,100,0005,000,0005,200,0005,100,000

4MERANTIPapanm34,800,0004,800,0004,700,0004,900,0004,800,000Balok/pesagenm34,550,0004,550,0004,500,0004,600,0004,550,000

5LANANPapanm32,075,0002,075,0002,050,0002,100,0002,075,000Balok/pesagenm31,825,0001,825,0001,750,0001,900,0001,825,000

6BENGKIRAIPapanm310,050,00010,050,0009,600,00010,500,00010,050,000Balok/pesagenm39,550,0009,550,0009,000,00010,100,0009,550,000

7DOLKENSedang 8 x 10 x 400 cmbt19,00019,00018,00020,00019,000Kecil 6 x 7 x 400 cmbt15,50015,50015,00016,00015,500Besar 10 x 12 x 400 cmbt27,00027,00026,00028,00027,000Kayu cetakanm31,075,0001,075,0001,050,0001,100,0001,075,000Kayu bakarm3157,500157,500150,000165,000157,500Bambubt11,50011,5008,00015,00011,500

IV . BAHAN PENUTUP DINDING / LANTAI1UBIN (TEGEL BIASA) PC polos30 X 30 cmm237,00037,00036,00038,00037,00020 X 20 cmm235,50035,50035,00036,00035,500 PC warna 30 X 30 cmm243,00043,00040,00046,00043,00020 X 20 cmm239,50039,50039,00040,00039,500 Teraso 30 X 30 cmm243,50043,50042,00045,00043,5002TEGEL PLINT PC warna 10 X 20 cmbh5,2505,2505,0005,5005,250PC abu-abu15 x 20bh5,2505,2504,5006,0005,250

3POLIS UBINLantai/badanm'0.00.00.00.00.0Plintm'0.00.00.00.00.0Trapm'0.00.00.00.00.0

4UBIN PORSELIN Lokal11 X 11 putihdos40,00040,00038,00042,00040,00011 X 11 warnados43,50043,50042,00045,00043,500 Lokal15 X 15 putihdos45,50045,50045,00046,00045,50015 X 15 warnados47,00047,00046,00048,00047,0005MOZAIK PORSELIN 10 X 20 cm(diamond)m247,50047,50045,00050,00047,500 15 X 15 cm (diamond)m251,50051,50045,00058,00051,500 20 X 20 cm (diamond)m246,50046,50045,00048,00046,500 20 X 25 cm (diamond)m248,00048,00047,00049,00048,000

6Keramik 30 X 30 cm m250,50050,50045,00056,00050,500 20 X 20 cm m249,00049,00044,00054,00049,00033 x 33 cmm251,50051,50048,00055,00051,50025 x 25 cmm248,00048,00045,00051,00048,00015 x 20 cmm248,00048,00044,00052,00048,000

7Parquet Jatim2192,500192,500175,000210,000192,500

8Batu Parosm281,50081,50078,00085,00081,500

9Batu Tempel Hitamm282,50082,50080,00085,00082,500

10GRANITO40 x 40 cmm2365,000365,000350,000380,000365,00030 x 30 cmm2465,000465,000450,000480,000465,00011Marmerm2465,000465,000450,000480,000465,000V . B A H A N C E T A K1BUIS BETON 10 cm - 100 cmbh27,50027,50027,00028,00027,50020 cm - 100 cmbh34,00034,00033,00035,00034,00030 cm - 100 cmbh41,25041,25040,00042,50041,25050 cm - 100 cmbh75,00075,00070,00080,00075,00060 cm - 100 cmbh97,50097,50090,000105,00097,50070 cm - 100 cmbh130,000130,000125,000135,000130,000U10 cm - 100 cmbh19,00019,00018,00020,00019,000U15 cm - 100 cmbh26,00026,00025,00027,00026,000U20 cm - 100 cmbh33,50033,50032,00035,00033,500U30 cm - 100 cmbh38,50038,50037,00040,00038,500U50 cm - 100 cmbh0.00.00.00.00.0

2LUBANG ANGIN (ROSTER) PC + PASIR10 X 20 cmbh29,60029,6005,20054,00029,60020 X 20 cmbh6,1006,1006,0006,2006,10025 X 25 cmbh6,6006,6006,5006,7006,60030 X 30 cmbh7,1007,1007,0007,2007,10015 X 25 cmbh7,3757,3757,2507,5007,37515 X 30 cmbh7,5507,5507,5007,6007,550

VI . B A H A N B E S I1BESI BETON besi beton polos kg10,35010,35010,00010,70010,350besi beton prestresskg16,35016,35015,50017,20016,350besi beton ulirkg12,75012,75012,50013,00012,750

2BESI PLATBesi Strip kg13,85013,85013,70014,00013,850

3BESI PROFIL Besi Profilkg13,87513,87513,50014,25013,875

4JARING - JARING BAJA Diameter 4 - 15kg15,25015,25015,00015,50015,250 Diameter 6 - 15kg14,75014,75014,00015,50014,750Kawat Bronjong
Hendra: Hendra:Maret 2011kg13,50013,50012,00015,00013,5005BESI SIKU L40 X 40 X 4btg142,500142,500140,000145,000142,500L50 X 50 X 5btg222,500222,500220,000225,000222,500L60 X 60 X 6btg317,500317,500310,000325,000317,500

6KAWAT - Ikat beton/bendratkg16,50016,50016,00017,00016,500 - Harmonika 12 X 45 mmm220,50020,50020,00021,00020,500 - Harmonika 12 X 24 mmm222,25022,25022,00022,50022,250 - Harmonika 14 X 30 mmm219,50019,50019,00020,00019,500 - Harmonika 14 X 35 mmm218,25018,25017,50019,00018,250 - Kawat Nyamuk Nylonm29,5009,5009,00010,0009,500 - Kawat Kasam212,50012,50012,00013,00012,500 - Saringan pasirm212,50012,50010,00015,00012,500 - Kawat loketm213,50013,50012,00015,00013,500 - Kawat durirol102,500102,50080,000125,000102,500 - Kawat bronjongkg13,50013,50012,00015,00013,500VII . B A H A N P I P A1Pipa PVC SII SCJ , S - 12,5 (10 bar)Pipa PVC DN 20 ( " ) AW JISbtg24,00024,000panjang 4 m23,00025,00024,000Pipa PVC DN 25 ( " ) AW JISbtg27,50027,500panjang 4 m27,00028,00027,500Pipa PVC DN 32 ( 1" ) AW JISbtg39,75039,750panjang 4 m39,00040,50039,750Pipa PVC DN 40 ( 1" )btg69,50069,500panjang 6 m69,00070,00069,500Pipa PVC DN 63 ( 2" )btg96,50096,500panjang 6 m95,00098,00096,500Pipa PVC DN 90 ( 3" )btg192,500192,500panjang 6 m190,000195,000192,500Pipa PVC DN 110 ( 4" )btg295,000295,000panjang 6 m290,000300,000295,000Pipa PVC DN 160 ( 6" )btg565,000565,000panjang 6 m545,000585,000565,000Pipa PVC DN 200 ( 8" )btg937,500937,500panjang 6 m925,000950,000937,500Pipa PVC DN 250 ( 10" )btg1,475,0001,475,000panjang 6 m1,450,0001,500,0001,475,000Pipa PVC DN 315 ( 12" )btg2,075,0002,075,000panjang 6 m2,050,0002,100,0002,075,000

3Pipa Medium B Galvanis - SIIPipa Medium B Galvanis DN "btg100,000100,000panjang 6 m95,000105,000100,000Pipa Medium B Galvanis DN 25 ( " )btg147,500147,500panjang 6 m145,000150,000147,500Pipa Medium B Galvanis DN 32 ( 1" )btg225,000225,000panjang 6 m220,000230,000225,000Pipa Medium B Galvanis DN 50 ( 1" )btg345,000345,000panjang 6 m340,000350,000345,000Pipa Medium B Galvanis DN 63 ( 2" )btg248,000248,000panjang 6 m450,00046,000248,000Pipa Medium B Galvanis DN 2"btg775,000775,000panjang 6 m750,000800,000775,000Pipa Medium B Galvanis DN 90 ( 3" )btg1,050,0001,050,000panjang 6 m1,000,0001,100,0001,050,000Pipa Medium B Galvanis DN 110 ( 4" )btg1,775,0001,775,000panjang 6 m1,700,0001,850,0001,775,000Pipa Medium B Galvanis DN 160 ( 6" )btg0.00.0panjang 6 m0.00.00.0Pipa Medium B Galvanis DN 200 ( 8" )btg0.00.0panjang 6 m0.00.00.0Pipa Medium B Galvanis DN 250 ( 10")btg0.00.0panjang 6 m0.00.00.0

VIII . B A H A N L A N G I T - L A N G I T1AKUSTIK-uk :30 X 30lbr4,8504,8504,7005,0004,85030 X 60lbr11,50011,50011,00012,00011,50060 X 120lbr37,50037,50037,00038,00037,500List Kayu Profilm'4,6004,6004,2005,0004,6002SOFT BOARD-uk: 4'X 8'Gypsum tebal 9 mm lbr59,00059,00058,00060,00059,0003HARD BOARD-uk: 4'X 8'lbr63,50063,50062,00065,00063,500

4PLY WOOD Teak wood 90 X 210X 3 mmlbr36,50036,50033,00040,00036,500 . 120 X 240X 3 mmlbr43,50043,50042,00045,00043,500 . 90 X 210 X 4 mmlbr52,50052,50050,00055,00052,500 . 90 X 210 X 9 mmlbr97,50097,50090,000105,00097,500 . 90 X 210 X 12 mmlbr137,500137,500125,000150,000137,500 . 90 X 210 X 15 mmlbr225,000225,000220,000230,000225,000 . 90 X 210 X 18 mmlbr280,000280,000270,000290,000280,000 Tripleks . 120 X 240 X 3 mmlbr34,00034,00033,00035,00034,000 . 120 X 240 X 4 mmlbr44,00044,00043,00045,00044,000 . 120 X 240 X 6 mmlbr61,50061,50058,00065,00061,500 Multipleks . 120 X 240 X 9 mmlbr105,000105,000100,000110,000105,000 . 120 X 240 X 12 mmlbr127,500127,500120,000135,000127,500 . 120 X 240 X 15 mmlbr167,500167,500165,000170,000167,500 . 120 X 240 X 18 mmlbr191,000191,000187,000195,000191,000Formika ukuran pintulbr62,50062,50060,00065,00062,500

IX . B A H A N F I N I S H I N G1KAYUMenie kg14,00014,00013,00015,00014,000Dempul plamur kg14,50014,50014,00015,00014,500Ambril/amplaslbr3,6003,6003,5003,7003,600Batu Apungkg6,0006,0005,5006,5006,000Cat dasarkg14,60014,60013,20016,00014,600. Emcokg45,25045,25044,00046,50045,250. Yunior 66 (nippon paint)kg45,50045,50043,00048,00045,500. Primalinltr0.00.00.00.00.0. Deculuxkg46,00046,00045,00047,00046,000. Siralaxons9,2509,2508,00010,5009,250. Spiritusltr10,00010,0009,00011,00010,000. Plitur jadiltr57,00057,00052,00062,00057,000

2TEMBOKKalkariumkg4,1004,1004,0004,2004,100Kapur sirihkg4,6254,6254,5004,7504,625Plamurkg11,25011,25010,50012,00011,250Cat Tembokkg19,00019,00018,00020,00019,000Sintex5 kg81,50081,50078,00085,00081,500Danabride5 kg87,50087,50080,00095,00087,500Catylac5 kg100,000100,00095,000105,000100,000Mowilex5 kg165,000165,000225,000105,000165,00082,500Cat Genteng antilum4 kg127,500127,500125,000130,000127,50063,750

3BESI33,000.0Meniekg17,50017,50015,00020,00017,500Cat mengkilatkg50,00050,00048,00052,00050,000Catkg14,50014,50013,00016,00014,500Thinner Altr9,5009,5008,00011,0009,500Minyak catltr9,1259,1257,00011,2509,125Thinner Superltr10,00010,0008,00012,00010,000 Residu (teer/aspal)drum48,75048,75037,50060,00048,750 Fibre glass (tanki air) kapasitas 550 liter.bh642,500642,500610,000675,000642,500 kapasitas 1100 liter.bh1,125,0001,125,0001,050,0001,200,0001,125,000Lem Aica Aibonkg33,50033,50032,00035,00033,500

X . B A H A N K A C A1POLOS 3 mmm259,00059,00058,00060,00059,000 5 mmm271,25071,25070,00072,50071,250

2ES KABUR 3 mmm276,50076,50075,00078,00076,500 5 mmm286,50086,50085,00088,00086,500

3RAY BAND 3 mmm266,50066,50065,00068,00066,500 5 mmm275,00075,00072,00078,00075,000

XI . BAHAN INSTALASI LISTRIK

1KABEL LISTRIK N Y A : .1 X 1 1/2mm2m'2,6502,6502,2003,1002,650SPLN LMK1 X 2 1/2mm2m'3,6503,6503,6003,7003,650 .1 X 4mm2m'5,6505,6505,5005,8005,6501 X 6mm2m'8,4508,4508,4008,5008,450 N Y Y : .2 X 1 1/2mm2m'8,7508,7508,5009,0008,750PRIMA2 X 2 1/2mm2m'14,50014,50014,00015,00014,500 .2 X 4mm2m'26,25026,25025,00027,50026,2502 X 6mm2m'34,50034,50034,00035,00034,5003 X 1 1/2mm2m'12,85012,85012,50013,20012,8503 X 2 1/2mm2m'19,50019,50019,00020,00019,5003 X 4mm2m'34,50034,50034,00035,00034,5003 X 6mm2m'49,00049,00048,00050,00049,000 N Y M : .2 X 1 1/2mm2m'7,0007,0006,8007,2007,000PRIMA2 X 2 1/2mm2m'10,70010,70010,20011,20010,700 .2 X 4mm2m'21,50021,50021,00022,00021,5003 X 1 1/2mm2m'12,75012,75012,50013,00012,7503 X 2 1/2mm2m'19,50019,50019,00020,00019,5003 X 4mm2m'30,50030,50030,00031,00030,5003 X 6mm2m'44,00044,00043,00045,00044,000

2SKAKELAR Out bauw .Seribh17,50017,50015,00020,00017,500 .Engkelbh13,50013,50012,00015,00013,500 In bauw .Seribh14,00014,00011,50016,50014,000 .Engkelbh10,75010,7509,50012,00010,750

3FUSE BOX (SEKERING KASA) 1 groupbh120,000120,000115,000125,000120,000 2 groupbh225,000225,000220,000230,000225,000 3 groupbh337,500337,500325,000350,000337,500

4STEKER - Biasabh10,75010,7509,50012,00010,750Ardebh15,00015,00014,00016,00015,000T Biasabh12,00012,00011,00013,00012,000T dengan Ardebh16,25016,25015,00017,50016,250

5FITING Flaonbh8,2508,2507,5009,0008,250Gantungbh8,5008,5007,5009,5008,500Kapbh13,50013,50011,00016,00013,500Kombinasibh12,25012,25010,00014,50012,250

6STOP KONTAK - Arde Outbow putihbh13,75013,75012,50015,00013,750Arde Outbow hitambh5,5005,5005,0006,0005,500Arde IBbh12,50012,50010,00015,00012,500
User: User:
User: User:Arde Putarbh36,50036,50031,00042,00036,500


User: User:
User: User:XII . ALAT - ALAT PENGUNCI & PENGGANTUNG1KUNCI TANAMUnion :1 X slagbh52,50052,50050,00055,00052,5002 X slagbh65,00065,00060,00070,00065,000Yale :1 X slagbh80,00080,00075,00085,00080,0002 X slagbh132,500132,500125,000140,000132,500Kuda :1 X slagbh50,00050,00045,00055,00050,0002 X slagbh67,50067,50060,00075,00067,500

2ENGSEL DAN GERENDEL Engsel Anginbh15,50015,50015,00016,00015,500 Kupu-kupu biasabh2,3752,3752,2502,5002,375 Nylon kupu-kupubh7,0007,0005,0009,0007,000 Espagnoled - dalam negeribh31,00031,00030,00032,00031,000 Grendel Tanam luar negeribh7,8757,8757,5008,2507,875 Grendel biasabh8,7508,7507,50010,0008,750 Kait Anginbh10,00010,0005,00015,00010,000
User: User:
User: User: Door Stopbh300,000300,000250,000350,000300,000

XIII . BAHAN SANITAIR1KLOSET DUDUKbh1,200,0001,200,000950,0001,450,0001,200,000

2KLOSET JONGKOKbh137,500137,500125,000150,000137,500bh0.00.00.00.00.0

3WASTAFEL PEDESTAL 7,5 literbh700,000700,000650,000750,000700,000bh0.00.00.00.00.0

4WASTAFEL MEJA OVALbh750,000750,000700,000800,000750,000

5WASTAFEL GANTUNG BULATbh292,500292,500275,000310,000292,500

6WASTAFEL GANTUNG SUDUTbh255,000255,000240,000270,000255,000

7WASTAFEL GANTUNG SUDUT KECILbh235,000235,000230,000240,000235,0008WASTAFEL BAK CUCIbh157,500157,500145,000170,000157,5009TEMPAT SABUN GANTUNGbh28,75028,75027,50030,00028,750bh0.00.00.00.00.010TEMPAT SABUN TANAMbh22,50022,50020,00025,00022,500bh0.00.00.00.0

11SEPTIC TANK (ETERNIT GRESIK) 5 Pemakai 500 literunit0.00.00.00.00.010 Pemakai 1.000 literunit0.00.00.00.00.012LAIN - LAINKran Airbh11,25011,2507,50015,00011,250Seal tapebh2,5002,5002,0003,0002,500Floor drainbh23,75023,75022,50025,00023,750

XIV . ALAT PENGIKAT KAYU1PAKU - ukuran 1" s/d 4"kg13,50013,50012,50014,50013,5002PAKU - payungkg16,50016,50015,00018,00016,5003PAKU - sekrupdoos12,75012,75012,00013,50012,7504PAKU - betonbh17,50017,50017,00018,00017,5005MUR BAUT (kuda-kuda)kg13,50013,50013,00014,00013,5006ANGKUR BAUTbh12,90012,90012,80013,00012,9007LEM KAYUbh19,00019,00018,00020,00019,0008Tali Ijukkg19,00019,00018,00020,00019,000

XV . POMPA AIR.1POMPA AIR TANGAN Dragon buatan Indonesiabh325,000325,000300,000350,000325,0002POMPA AIR LISTRIK Sanyo 100 wattbh1,012,5001,012,500975,0001,050,0001,012,500
User: User: Fuji 250 wattbh1,475,0001,475,0001,450,0001,500,0001,475,000 Shimizu. 100 wattbh425,000425,000380,000470,000425,000. 90 wattbh355,000355,000350,000360,000355,000 D a b. 125 wattbh310,000310,000300,000320,000310,000. 175 wattbh412,500412,500400,000425,000412,500

X VI . PAVING BLOCK1SQUAREAbu-abum245,50045,50042,00049,00045,500Merah/hitamm248,00048,00045,00051,00048,0002HOLLANDAbu-abum245,50045,50042,00049,00045,500Merah/hitamm248,00048,00045,00051,00048,0003UNIDECORAbu-abum245,50045,50042,00049,00045,500Merah/hitamm245,50045,50040,00051,00045,5004U N IAbu-abum245,50045,50042,00049,00045,500Merah/hitamm246,00046,00041,00051,00046,0005TRIHEXAbu-abum244,50044,50040,00049,00044,500
User: User:Merah/hitamm245,50045,50040,00051,00045,5006OLYMPIA HEXAAbu-abum244,50044,50040,00049,00044,500
User: User:7HEXAGONALAbu-abum245,50045,50040,00051,00045,500
User: User:Merah/hitamm244,50044,50040,00049,00044,5008CASTLEAbu-abum245,50045,50040,00051,00045,5009TRAPEZAbu-abum244,50044,50040,00049,00044,50010TRAPEZ GRASS BLOCKAbu-abum243,00043,00041,00045,00043,00011STANDARD GRASS BLOCK ABU-ABUm28,0008,0007,0009,0008,00012BATACOm23,0003,0002,7503,2503,00013KANSTEENm'25,50025,50022,50028,50025,500XVII. L A I N - L A I N1KREI 25 MMm242,50042,50040,00045,00042,5002Sliding Pintu J4bh192,500192,500185,000200,000192,5003Naco per Daunbh10,75010,75010,50011,00010,7504Rolling door Besim2242,500242,500230,000255,000242,500Rolling door Almuniumm2237,500237,500230,000245,000237,5005Awning Almuniumm282,50082,50080,00085,00082,5006Kusen Almunium 4" Putihm'72,50072,50070,00075,00072,5007WIDE FLANGE BEAM
User: User:150 X 75 X 5 X 7 X 12btg1,390,0001,390,0001,350,0001,430,0001,390,000

8ASPAL.Aspal Pertaminadrum1,350,0001,350,0001,300,0001,400,0001,350,000


User: User:Hotmix Tebal = 4 Cmm263,75063,75062,50065,00063,750
User: User:Hotmix Tebal = 5 Cmm277,50077,50075,00080,00077,500
User: User:Hotmix Tebal = 6 Cmm292,50092,50090,00095,00092,500Hotmix Tebal = 7 Cmm2107,500107,500105,000110,000107,500Binder Courseton1,275,0001,275,0001,250,0001,300,0001,275,000Wearing Courseton1,325,0001,325,0001,250,0001,400,0001,325,000Hot Roller Sheetton1,175,0001,175,0001,150,0001,200,0001,175,000Sand Sheetton1,150,0001,150,0001,100,0001,200,0001,150,000Sand Sheet Emulsiton1,475,0001,475,0001,450,0001,500,0001,475,000Cold Mixton1,775,0001,775,0001,750,0001,800,0001,775,000Prime / Tack Coard RCliter8,0008,0007,8008,2008,000Prime Coat MCliter8,0008,0007,8008,2008,000Prime / Tack Coat Emulsiliter8,0008,0007,8008,2008,00010K A C ADark Grey 5 mmm20.00.00.0Grey Euro / Green 5 mmm20.00.00.0Bronze / Blue / Green 5 mmm20.00.00.0Cerminm2217,500217,500210,000225,000217,50011TIANG PANCANG 40 cmm'0.00.00.00.00.0Tiang Pancang Beton 45 cmm'0.00.00.00.00.0
User: User: 50 cmm'0.00.00.00.00.0Tiang Pancang BajaDiameter 40 cm, t = 12 mmm'0.00.00.00.00.0Diameter 50 cm, t = 12 mmm'0.00.00.00.00.012PAGAR BRC.Pagar BRC 90 A2/lb525,000525,000500,000550,000525,000Pagar BRC 120 A2/lb625,000625,000600,000650,000625,00013LAIN-LAIN0.0Minyak Beton & bekistingltr9,0009,0008,00010,0009,000Pintu Lipat Besim2390,000390,000380,000400,000390,000Sunscreen Allumunimm2295,000295,000280,000310,000295,000Allumunium Foilm26,8006,8006,5007,1006,800Soda apikg12,50012,50012,00013,00012,500Sabunkg12,00012,00011,00013,00012,000Airm38,2508,2508,0008,5008,250Koas Alang-alangikat1,3751,3751,2501,5001,375Solar (Industri)ltr11,27511,27511,25011,30011,275Bensin (Industri)ltr8,9258,9258,9008,9508,925Pelumasltr33,25033,25031,50035,00033,250

TAMBAHAN14Kalsiboard tebal 9 mm, 1200 mm x 2400 cm ex. Nusaboardlbr0.00.00.015Kalsiboard tebal 4.5 mm, 1200 mm x 2400 cm ex. Kalsiboard Ling 4.5lbr0.00.00.016Keramik 10 x 30 cm (Stepnozing)m20.00.00.017Ramset + Mesiudos0.00.0100 set0.018Besi Hollow Galvanise 40x40, t=5 mm m'0.00.04 meter0.019Tepung Gypsum ex CA Jayakg0.00.020 kg0.020List plafond gypsum ex. Kiki 1, 15 x 210 cmm0.00.00.0List plafond gypsum standartm0.00.00.021Atap Gelombang besar ex.eter6 5 mm (1000x2250 mm)lbr0.00.00.022Kaca Clear 8 mmm20.00.00.023Sealent Black / GreyTube0.00.00.024Vertical Blinds (tirai)m20.00.00.025Almunium 4" color anodizedm'0.00.00.026Rambucis (kunci handle alumunium)bh0.00.00.027Handle jendela alumuniumbh0.00.00.028Pipa listrikbh1,5001,5000.029Handle pintu stainlesssteelbh0.00.00.030Sticker sundblastm20.00.00.031Krepyak almuniumm20.00.00.032Kaca rayban 8 mmm20.00.00.033Engsel jendela biasapsg0.00.00.034Handle jendela biasabh0.00.00.035Cat Melamin (Impra)kg0.00.01 kg0.036Nok Stel Gelombang AX6 (eter)lbr0.00.00.037Lampu Philips Tornado 23 Wattbh40,00040,0000.038Granit tile 60 x 60 cm ex.granitobh0.00.00.039Granit tile 60 x 60 cm ex.granito (Assesories Unpolish)bh0.00.00.040Granit tile 10 x 60 cm ex.granito polished (Assesories gold)bh0.00.00.041Granit tile 30 x 30 cm ex.granito polished (Assesories gold)bh0.00.00.042Cat Tembok Weathershield Dulux Exteriorkg0.00.00.043Cat Besi dan Kayu Weathershield Dulux Exterior glosskg0.00.00.044Cat Besi dan Kayu Dulux Interior V glosskg0.00.00.045Step nosing tangga bahan PVClbr0.00.0pj 4 meter0.046Besi siku union SA 100 x 4 (40x60x2) mmbtg0.00.0pj 4 meter0.047Gypsum board 4.5 mmlbr0.00.00.048Kaca clear 12 mmm20.00.00.049Kaca clear 12 mm flat temperedm20.00.00.050Kaca clear 12 mm curve temperedm20.00.00.051Engsel Pintu Floorhings ex Dormaset0.00.00.052Keramik 60 x 60 cmbh0.00.01 bh0.053Policarbonatlbr0.00.00.054Alumunium profil Hm'0.00.00.055Alumunium profil Um'0.00.00.0

Surakarta, 11 Desember 2013PT. ARCI PROPERTY, Tbk

MUHAMMAD ARDIAN, S.T, M.TDirektur Utama

0.0700.05041,000,0000.01407114,0001

49,13060,69066,470

0.330.330.108919.1827364555

0.030.024410.241.6666666667

190000

180000

XVPEKERJAAN PERPIPAAN (Referensi PDAM)

1S-0051m'Galian tanah untuk Pemasangan PipaS-005.a0.600m3Pipa 6"ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!S-005.b0.400m3Pipa 4"ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!S-005.c0.300m3Pipa 3"ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!S-005.d0.200m3Pipa 2"ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!S-005.e0.150m3Pipa 1,5" ; 1,25"ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!S-005.f0.100m3Pipa 1" ; 0,75' ; 0,5"ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!

2S-0101m'Urugan tanah kembali untuk Pemasangan PipaS-010.a0.700m3Pipa 6"2,387.502,387.501,671.251,671.25S-010.b0.400m3Pipa 4"2,387.502,387.50955.00955.00S-010.c0.300m3Pipa 3"2,387.502,387.50716.25716.25S-010.d0.200m3Pipa 2"2,387.502,387.50477.50477.50S-010.e0.150m3Pipa 1,5" ; 1,25"2,387.502,387.50358.13358.13S-010.f0.100m3Pipa 1" ; 0,75' ; 0,5"2,387.502,387.50238.75238.75

3S-0121m'Urugan Pasir untuk Pemasangan PipaS-012.a0.1500m'Pipa 6"23,875.0023,875.003,581.253,581.25S-012.b0.1000m'Pipa 4"23,875.0023,875.002,387.502,387.50S-012.c0.0800m'Pipa 3"23,875.0023,875.001,910.001,910.00S-012.d0.0650m'Pipa 2"23,875.0023,875.001,551.881,551.88S-012.e0.0600m'Pipa 1,5" ; 1,25"23,875.0023,875.001,432.501,432.50S-012.f0.0500m'Pipa 1" ; 0,75' ; 0,5"23,875.0023,875.001,193.751,193.75

4P- 011m'Ongkos Pasang Pipa PVC12,900.0012,900.000.1500ohPekerja42,500.0042,500.006,375.006,375.000.0900ohTukang57,500.0057,500.005,175.005,175.000.0090ohKepala Tukang62,500.0062,500.00562.50562.500.0150ohMandor52,500.0052,500.00787.50787.50

51m'Ongkos Pasang Pipa PVC DNP-01.a1.5000m'Pipa 6"12,900.0012,900.0019,350.0019,350.00P-01.b1.0000m'Pipa 4"12,900.0012,900.0012,900.0012,900.00P-01.c0.6500m'Pipa 3"12,900.0012,900.008,385.008,385.00P-01.d0.5000m'Pipa 2"12,900.0012,900.006,450.006,450.00P-01.e0.4000m'Pipa 1,5" ; 1,25"12,900.0012,900.005,160.005,160.00P-01.f0.2500m'Pipa 1" ; 0,75' ; 0,5"12,900.0012,900.003,225.003,225.00

6P - 021m'Ongkos Pasang Pipa GIP DN33,800.0033,800.000.1300ohPekerja42,500.0042,500.005,525.005,525.000.3900ohTukang57,500.0057,500.0022,425.0022,425.000.0390ohKepala Tukang62,500.0062,500.002,437.502,437.500.0650ohMandor52,500.0052,500.003,412.503,412.50

71m'Ongkos Pasang Pipa GIP DNP-02.a1.2500m3Pipa 6"33,800.0033,800.0042,250.0042,250.00P-02.b1.0000m3Pipa 4"33,800.0033,800.0033,800.0033,800.00P-02.c0.6500m3Pipa 3"33,800.0033,800.0021,970.0021,970.00P-02.d0.5000m3Pipa 2"33,800.0033,800.0016,900.0016,900.00P-02.e0.4000m3Pipa 1,5" ; 1,25"33,800.0033,800.0013,520.0013,520.00P-02.f0.2500m3Pipa 1" ; 0,75' ; 0,5"33,800.0033,800.008,450.008,450.00

81m'Pengetesan Pipa ERROR:#REF!ERROR:#REF!9500m'Pengetesan Pipa ERROR:#REF!ERROR:#REF!Bahan282,000.00282,000.001.000m3Air8,250.008,250.008,250.008,250.000.150m3Kayu Lokal1,825,000.001,825,000.00273,750.00273,750.00

TenagaERROR:#REF!ERROR:#REF!49000566441.000m3galian TanahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!36.000ohTukang57,500.0057,500.002,070,000.002,070,000.006.000ohKepala Tukang62,500.0062,500.00375,000.00375,000.003.000ohMandor52,500.0052,500.00157,500.00157,500.00

1.000alat Test (ls)45,000.0045,000.0045,000.0045,000.00

10P- 0261m'Pekerjaan Pemasangan Pipa GIP 6"ERROR:#REF!ERROR:#REF!Bahan0.00.01m'Pipa GIP 6"0.000.000.00.0

TenagaERROR:#REF!ERROR:#REF!1m'Galian TanahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!48000554881m'Urugan Pasir3,581.253,581.253,581.253,581.251m'Urugan Tanah Kembali1,671.251,671.251,671.251,671.251m'Ongkos Pemasangan 42,250.0042,250.0042,250.0042,250.001m'Pengetesan PipaERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!

11P- 0241m'Pekerjaan Pemasangan Pipa GIP 4"ERROR:#REF!ERROR:#REF!Bahan1,775,000.001,775,000.001m'Pipa GIP 4"1,775,000.001,775,000.001,775,000.001,775,000.00

TenagaERROR:#REF!ERROR:#REF!1m'Galian TanahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1m'Urugan Pasir2,387.502,387.502,387.502,387.501m'Urugan Tanah Kembali955.00955.00955.00955.0051000589561m'Ongkos Pemasangan 33,800.0033,800.0033,800.0033,800.001m'Pengetesan PipaERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!

12P- 0231m'Pekerjaan Pemasangan Pipa GIP 3"ERROR:#REF!ERROR:#REF!Bahan1,050,000.001,050,000.001m'Pipa GIP 3"1,050,000.001,050,000.001,050,000.001,050,000.00

TenagaERROR:#REF!ERROR:#REF!1m'Galian TanahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1m'Urugan Pasir1,910.001,910.001,910.001,910.001m'Urugan Tanah Kembali716.25716.25716.25716.251m'Ongkos Pemasangan 21,970.0021,970.0021,970.0021,970.001m'Pengetesan PipaERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!

13P- 0221m'Pekerjaan Pemasangan Pipa GIP 2"ERROR:#REF!ERROR:#REF!Bahan248,000.00248,000.001m'Pipa GIP 2"248,000.00248,000.00248,000.00248,000.00

TenagaERROR:#REF!ERROR:#REF!1m'Galian TanahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1m'Urugan Pasir1,551.881,551.881,551.881,551.881m'Urugan Tanah Kembali477.50477.50477.50477.501m'Ongkos Pemasangan 16,900.0016,900.0016,900.0016,900.001m'Pengetesan PipaERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!

14P- 021a1m'Pekerjaan Pemasangan Pipa GIP 1,5"ERROR:#REF!ERROR:#REF!Bahan345,000.00345,000.001m'Pipa GIP 1,5"345,000.00345,000.00345,000.00345,000.00

TenagaERROR:#REF!ERROR:#REF!1m'Galian TanahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1m'Urugan Pasir1,432.501,432.501,432.501,432.501m'Urugan Tanah Kembali358.13358.13358.13358.131m'Ongkos Pemasangan 13,520.0013,520.0013,520.0013,520.001m'Pengetesan PipaERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!

15P- 021b1m'Pekerjaan Pemasangan Pipa GIP "ERROR:#REF!ERROR:#REF!Bahan147,500.00147,500.001m'Pipa GIP "147,500.00147,500.00147,500.00147,500.00

TenagaERROR:#REF!ERROR:#REF!1m'Galian TanahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1m'Urugan Pasir1,193.751,193.751,193.751,193.751m'Urugan Tanah Kembali238.75238.75238.75238.751m'Ongkos Pemasangan 8,450.008,450.008,450.008,450.001m'Pengetesan PipaERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!

16P- 0141m'Pekerjaan Pemasangan Pipa PVC 4"ERROR:#REF!ERROR:#REF!Bahan295,000.00295,000.001m'Pipa PVC 4"295,000.00295,000.00295,000.00295,000.00

TenagaERROR:#REF!ERROR:#REF!1m'Galian TanahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1m'Urugan Pasir2,387.502,387.502,387.502,387.501m'Urugan Tanah Kembali955.00955.00955.00955.001m'Ongkos Pemasangan 12,900.0012,900.0012,900.0012,900.001m'Pengetesan PipaERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!

17P- 0131m'Pekerjaan Pemasangan Pipa PVC 3"ERROR:#REF!ERROR:#REF!Bahan192,500.00192,500.001m'Pipa PVC 3"192,500.00192,500.00192,500.00192,500.00

TenagaERROR:#REF!ERROR:#REF!1m'Galian TanahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1m'Urugan Pasir1,910.001,910.001,910.001,910.001m'Urugan Tanah Kembali716.25716.25716.25716.251m'Ongkos Pemasangan 8,385.008,385.008,385.008,385.001m'Pengetesan PipaERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!

18P- 0111m'Pekerjaan Pemasangan Pipa PVC 1"ERROR:#REF!ERROR:#REF!Bahan39,750.0039,750.001m'Pipa PVC 1"39,750.0039,750.0039,750.0039,750.00

TenagaERROR:#REF!ERROR:#REF!1m'Galian TanahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1m'Urugan Pasir1,193.751,193.751,193.751,193.751m'Urugan Tanah Kembali238.75238.75238.75238.751m'Ongkos Pemasangan 3,225.003,225.003,225.003,225.001m'Pengetesan PipaERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!

19P- 011d1m'Pekerjaan Pemasangan Pipa PVC "ERROR:#REF!ERROR:#REF!Bahan27,500.0027,500.001m'Pipa PVC "27,500.0027,500.0027,500.0027,500.00

TenagaERROR:#REF!ERROR:#REF!1m'Galian TanahERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!1m'Urugan Pasir1,193.751,193.751,193.751,193.751m'Urugan Tanah Kembali238.75238.75238.75238.751m'Ongkos Pemasangan 3,225.003,225.003,225.003,225.001m'Pengetesan PipaERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!

5000057800

4000046240

5000057800

5000057800

25002890

4500052020

Upah 2013PT. ARCI PROPERTYJalan Martadinata 68, Jebres, Surakarta, Jawa tengahTelepon :(0271)628133Email: [email protected]

D A F T A R U P A H P E K E R J A

S U M B E R D A T A:P A S A R A N B E B A SD A E R A H:KOTA SEMARANGEDISI Maret 2013

HARGA HPSHARGA MARET 2013NO. J E N I S B A H A NSATUANMINIMUM MAKSIMUMKET.MINIMUM MAKSIMUMRATA-RATA(Rp)(Rp)(Rp)(Rp)(Rp)1P e k e r j aHr42,50042,50040,00045,00042,5002M a n d o rHr52,50052,50050,00055,00052,5003T u k a n g l i s t r i kHr57,50057,50055,00060,00057,5004T u k a n g k a y uHr57,50057,50055,00060,00057,5005K e p . t k . k a y uHr62,50062,50060,00065,00062,5006T u k a n g b a t uHr57,50057,50055,00060,00057,5007K e p . t k . b a t uHr62,50062,50060,00065,00062,5008T u k a n g b e s iHr57,50057,50055,00060,00057,5009K e p . t k . b e s iHr62,50062,50060,00065,00062,50010T u k a n g c a tHr57,50057,50055,00060,00057,50011K e p . t k . c a tHr62,50062,50060,00065,00062,50012T u k a n g p l i t u rHr57,50057,50055,00060,00057,50013T u k a n g j a l a nHr42,50042,50040,00045,00042,50014T u k a n g g a l iHr42,50042,50040,00045,00042,50015Tukang masak aspalHr42,50042,50040,00045,00042,50016T k . l e i d e n gHr57,50057,50055,00060,00057,50017M a s i n i sHr112,500112,500100,000125,000112,50018P e m b . M a s i n i sHr45,00045,00040,00050,00045,00019P e n j a g a a p iHr47,50047,50045,00050,00047,50020P e n j a g a m a l a mHr42,50042,50040,00045,00042,50021SopirHr65,00065,00060,00070,00065,00022Pembantu SopirHr42,50042,50040,00045,00042,500

Surakarta, 11 Desember 2013PT. ARCI PROPERTY, Tbk

MUHAMMAD ARDIAN, S.T, M.TDirektur Utama

RABPT. ARCI PROPERTYJalan Martadinata 68, Jebres, Surakarta, Jawa tengahTelepon :(0271)628133Email: [email protected]

DAFTAR RENCANA ANGGARAN BIAYA

NoJenis PekerjaanVolumeSatuanHarga SatuanJumlah Harga(Rp)(Rp)APEKERJAAN PERSIAPAN1Membersihkan Lapangan dan Peralatan391m36,875.002,688,125.002Pagar Sementara dari Seng Gelombang Tinggi 2 meter68m514,935.6335,015,622.503Pengukuran dan Pemasangan Bouwplank95m108,757.5010,331,962.50Sub Jumlah A48,035,710.00

BPEKERJAAN TANAH1Galian Tanah Biasa Sedalam 2 meter228.61m340,612.509,284,423.632Urugan tanah kembali204.77m313,537.502,772,019.733Urugan Pasir 13.96m3154,275.002,153,524.73Sub Jumlah B14,209,968.08

CPEKERJAAN PONDASI1Pasang Pondasi Batu Kosong19.74m3290,820.005,740,786.802Pasang Lantai Kerja Pondasi Foot plat2.86m3843,391.962,412,101.023Pasang Pondasi batu kali 1 Pc: 5 PP38.18m3539,790.0020,606,483.254Pasang Pondasi Foot Plat (120 X 120)13.79m 818,693.0911,292,233.77Sub Jumlah C40,051,604.84

DPEKERJAAN DINDING DAN PLESTERAN1Pasang bata merah tebal 1/2 bata, 1 Pc : 5 Ps : 10Psr636.23m267,878.1343,186,370.982Plesteran 1 Pc : 5Ps, tebal 12 mm1268.10m231,356.6039,763,429.893Acian1268.10m215,400.0019,528,801.60Sub Jumlah D102,478,602.47

EPEKERJAAN BETON1Membuat beton tumbuk 1 Pc : 2 Ps : 3 Kr6.5m3728,061.254,732,398.132Membuat Beton Sloof Beton Bertulang (200 Kg Besi+Bekisting)10.56m35,170,132.5054,596,599.203Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)21.60m36,593,832.50142,426,782.004Membuat Plat Beton Bertulang (150 Kg Besi + Tanpa Bekisting)15.60m34,357,812.5067,981,875.005Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)10.8m38,193,470.0088,489,476.006Membuat Beton Bordess dan Anak Tangga 3.68m34,357,812.5016,034,026.37Sub Jumlah E374,261,156.69

FPEKERJAAN KUSEN, PINTU, JENDELA1Pasang kusen pintu, jendela, ventilasi, bouven kayu kamfer2.82m39,734,125.0027,488,732.91Sub Jumlah F27,488,732.91

GPEKERJAAN DAUN PINTU DAN JENDELA KACA DAN KAYU1Pekerjaan Daun Pintu 26.70m3320,575.008,560,506.572Pekerjaan Daun Jendela Kaca1.05m3244,800.00255,816.003Pasang kaca mati tebal 5 mm25.69m388,618.132,276,422.404Pekerjaan Angker104.28kg23,553.752,456,185.05Sub Jumlah G13,548,930.02

HPEKERJAAN KUNCI 1Pasang Kunci Silinder17buah161,918.752,752,618.752Pasang Engsel Pintu34buah17,631.25599,462.503Pasang Engsel Jendela52buah9,462.50492,050.004Pasang Grendel Jendela26buah19,381.25503,912.50Sub Jumlah H4,348,043.75

IPEKERJAAN LANTAI DAN DINDING KERAMIK1Memasang 1 m2 Lantai Keramik 30 x 30 cm222.0000m2144,310.6832,036,971.362Memasang 1 m2 Lantai Keramik 20 x 20 cm134m2141,416.0019,006,310.403Memasang 1 m2 Dinding Keramik 20x20 cm,39.24m276,186.692,989,565.62Sub Jumlah I54,032,847.38

JPEKERJAAN PLAFOND1Pasang Plafond Gypsum290.00m230,578.508,867,765.002Memasang 1 m2 Rangka Langit-langit 290m260,242.5017,470,325.003Memasang 1 m1 List Plafond Gypsum Motif205m13,275.002,721,375.00Sub Jumlah K29,059,465.00

KPEKERJAAN INSTALASI LISTRIK1Instalasi Titik Lampu24ttk80,843.751,940,250.002Instalasi Saklar17ttk24,593.75418,093.753Fuse Box1buah242,262.50242,262.504Penyambungan daya1buah128,250.00128,250.005Kabel NYY 2x4236.39m23,093.755,459,131.56Sub Jumlah M8,187,987.81

LPEKERJAAN ATAP1Pasang genteng Keramik multi roof199.76m71,287.5014,240,619.122Pasang Rangka Atap Genteng Keramik, Kayu Klas II3.80m3104,650.00397,837.443Pasang Lisplang Ukuran (2 x 20) cm0.22m375,003.0016,200.654Memasang Talang Jurai , Seng BJLS 0.301.87m3168,040.00315,007.785Pasang Konstruksi kuda-kuda kayu kruing1.18m38,103,487.509,582,600.87Sub Jumlah L24,552,265.86

MPEKERJAAN PENGECATAN1Pengecatan Tembok baru1268.10m212,572.5015,943,237.542Pengecatan Bidang Kayu Baru9.16m223,220.75212,664.92Sub Jumlah O16,155,902.46

NPEKERJAAN SANITASI DAN DRAINASE1Memasang 1 unit Closet Jongkok Porselen3bh377,287.501,131,862.502Memasang kran air diameter 3/415bh18,375.00275,625.003Membuat Septictank dan Rembesan2set188,861.00377,722.004Memasang Bak Mandi Batu Bata3bh1,001,504.553,004,513.645Memasang floor drain10bh30,812.50308,125.006Memasang Wastafel 10bh1,057,850.0010,578,500.007Memasang Bak Cuci Stainless Steel4bh196,878.75787,515.008Memasang 1 m' Pipa PVC tipe AW diameter 238m33,103.42209,654.979Memasang 1 m' Pipa PVC tipe AW diameter 339m61,993.17604,433.3810Membuat Saluran Air Bersih30m33,103.42993,102.5011Memasang Pompa Air1bh586,015.20586,015.20Sub Jumlah N18,857,069.18

JUMLAH775,268,286.44

Surakarta, 11 Desember 2013PT. ARCI PROPERTY, Tbk

MUHAMMAD ARDIAN, S.T, M.TDirektur Utama

REKAP RAB FIXPT. ARCI PROPERTYJalan Martadinata 68, Jebres, Surakarta, Jawa tengahTelepon :(0271)628133Email: [email protected]

REKAPITULASI RENCANA ANGGARAN BIAYA

NOJENIS PEKERJAANTOTAL BIAYA(Rp)APEKERJAAN PERSIAPAN48,035,710.00BPEKERJAAN TANAH14,209,968.08CPEKERJAAN PONDASI40,051,604.84DPEKERJAAN DINDING DAN PLESTERAN102,478,602.47EPEKERJAAN BETON374,261,156.69FPEKERJAAN KUSEN, PINTU, JENDELA27,488,732.91GPEKERJAAN DAUN PINTU DAN JENDELA13,548,930.02HPEKERJAAN KUNCI4,348,043.75IPEKERJAAN LANTAI DAN DINDING KERAMIK54,032,847.38JPEKERJAAN PLAFOND29,059,465.00KPEKERJAAN INSTALASI LISTRIK8,187,987.81LPEKERJAAN ATAP24,552,265.86MPEKERJAAN PENGECATAN16,155,902.46NPEKERJAAN SANITASI DAN DRAINASE18,857,069.18JUMLAH775,268,286.44PPN 10%77,526,828.64TOTAL852,795,115.09

Surakarta, 11 Desember 2013 PT. ARCI PROPERTY, Tbk

MUHAMAD ARDIAN, S.T, M.T Direktur Utama

DurasiPT. ARCI PROPERTYJalan Martadinata 68, Jebres, Surakarta, Jawa tengahTelepon :(0271)628133Email: [email protected]

PERHITUNGAN DURASI

JENIS PEKERJAAN :PERSIAPAN

1. Membersihkan Lapangan dan PeralatanVolume =391.00m2Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja10m/jam 1 pekerja dalam sehari dapat menyelesaikan 80m2Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=391.00 =5hariDipakai5pekerja80Maka pekerjaan akan selesai dalam 5 =1hari52. Pagar Sementara dari Seng Gelombang Tinggi 2 meterVolume =68.00m1Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja1.5m/jam 1 pekerja dalam sehari dapat menyelesaikan 12m1Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=68.00 =6hariDipakai6pekerja12Maka pekerjaan akan selesai dalam 6 =1hari63. Pengukuran dan Pemasangan BouwplankVolume =95.00m1Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja10.0m/jam 1 pekerja dalam sehari dapat menyelesaikan 80m1Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=95.00 =2hariDipakai2pekerja80Maka pekerjaan akan selesai dalam 2 =1hari2

JENIS PEKERJAAN :PEKERJAAN TANAH

1. Pekerjaan galian tanah untuk pondasiVolume =228.61m3Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.3m/jam 1 pekerja dalam sehari dapat menyelesaikan 2.4m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=228.61 =96hariDipakai12pekerja2.4Maka pekerjaan akan selesai dalam 96 =8hari122. Urugan tanah kembali Volume =204.77m3Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja1.0m/jam 1 pekerja dalam sehari dapat menyelesaikan 8m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=204.77 =26hariDipakai9pekerja8Maka pekerjaan akan selesai dalam 26 =3hari93. Urugan pasir Volume =13.96m3Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.18m/jam 1 pekerja dalam sehari dapat menyelesaikan 1.44m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=13.96 =10hariDipakai3pekerja1.44Maka pekerjaan akan selesai dalam 10 =4hari3

JENIS PEKERJAAN :PONDASI

1. Pasang Pondasi Batu KosongVolume =19.74m3Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.18m/jam 1 pekerja dalam sehari dapat menyelesaikan 1.44m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=19.74 =14hariDipakai5pekerja1.44Maka pekerjaan akan selesai dalam 14 =3hari52. Pasang Lantai Kerja Pondasi Foot platVolume =2.86m3Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.18m/jam 1 pekerja dalam sehari dapat menyelesaikan 1.44m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=2.86 =2hariDipakai201.44Maka pekerjaan akan selesai dalam 2 =1hari23. Pasang Pondasi batu kali 1 Pc: 5 PPVolume =38.18m3Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.18m/jam 1 pekerja dalam sehari dapat menyelesaikan 1.44m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=38.18 =27hariDipakai501.44Maka pekerjaan akan selesai dalam 27 =6hari5

4. Pasang Pondasi Foot Plat (120 X 120)Volume =13.79m3Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.18m/jam 1 pekerja dalam sehari dapat menyelesaikan 1.44m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=13.79 =10hariDipakai301.44Maka pekerjaan akan selesai dalam 10 =4hari3

JENIS PEKERJAAN :PASANGAN DAN PLESTERAN1. Pasangan bata merah 1pc : 5psVolume =636.23mWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja1.00m/jam 1 pekerja dalam sehari dapat menyelesaikan 8.000mWaktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=636.23 =80hariDipakai6tukang8.000Maka pekerjaan akan selesai dalam 80 =14hari62. Plesteran 1pc : 5ps, tebal 15 mmVolume =1268.10mWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja3.50m/jam 1 pekerja dalam sehari dapat menyelesaikan 28.000mWaktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=1268.10 =46hariDipakai6tukang28.000Maka pekerjaan akan selesai dalam 46 =8hari63. AcianVolume =1268.10mWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja3.50m/jam 1 pekerja dalam sehari dapat menyelesaikan 28.000mWaktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=1268.10 =46hariDipakai6tukang28.000Maka pekerjaan akan selesai dalam 46 =8hari6

JENIS PEKERJAAN :BETON

1. Membuat beton tumbuk 1 Pc : 2 Ps : 3 KrVolume =6.50m3Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.10m/jam 1 pekerja dalam sehari dapat menyelesaikan 0.80m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=6.50 =9hariDipakai4tukang0.80Maka pekerjaan akan selesai dalam 9 =3hari4

2. Membuat Beton Sloof Beton Bertulang (200 Kg Besi+Bekisting)Volume beton =10.56m3Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.10m/jam 1 pekerja dalam sehari dapat menyelesaikan 0.80m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=10.56 =14hariDipakai4tukang0.80Maka pekerjaan akan selesai dalam 14 =4hari4

3. Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)Volume =21.60m3Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.10m/jam 1 pekerja dalam sehari dapat menyelesaikan 0.80m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=21.60 =27hariDipakai6tukang0.80Maka pekerjaan akan selesai dalam 27 =5hari6

4. Membuat Plat Beton Bertulang (150 Kg Besi + Tanpa Bekisting)Volume =15.60m3Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.10m/jam 1 pekerja dalam sehari dapat menyelesaikan 0.80m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=15.60 =20hariDipakai6tukang0.80Maka pekerjaan akan selesai dalam 20 =4hari65. Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)Volume =10.80m3Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.10m/jam 1 pekerja dalam sehari dapat menyelesaikan 0.80m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=10.80 =14hariDipakai5tukang0.80Maka pekerjaan akan selesai dalam 14 =3hari56. Membuat Beton Bordess dan Anak Tangga Volume =3.68m3Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.10m/jam 1 pekerja dalam sehari dapat menyelesaikan 0.80m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=3.68 =5hariDipakai2tukang0.80Maka pekerjaan akan selesai dalam 5 =3hari2

JENIS PEKERJAAN :KUSEN, PINTU DAN JENDELA

1. Pasang kusen pintu, jendela, ventilasi, bouven kayu kamferVolume =2.82m3Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.050m/jam 1 pekerja dalam sehari dapat menyelesaikan 0.400m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=2.82 =8hariDipakai4tukang0.40Maka pekerjaan akan selesai dalam 8 =2hari4

JENIS PEKERJAAN :DAUN PINTU DAN JENDELA KACA DAN KAYU

1. Pekerjaan Daun Pintu Volume =26.70m3Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja1.500m/jam 1 pekerja dalam sehari dapat menyelesaikan 12.000m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=26.70 =3hariDipakai2tukang12.00Maka pekerjaan akan selesai dalam 3 =2hari22. Pekerjaan Daun Jendela KacaVolume =1.05m3Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.050m/jam 1 pekerja dalam sehari dapat menyelesaikan 0.400m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=1.05 =3hariDipakai2tukang0.40Maka pekerjaan akan selesai dalam 3 =2hari2

3. Pasang kaca mati tebal 5 mmVolume =25.69m3Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja1.000m/jam 1 pekerja dalam sehari dapat menyelesaikan 8.000m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=25.69 =4hariDipakai2tukang8.00Maka pekerjaan akan selesai dalam 4 =2hari24. Pekerjaan AngkerVolume =39.00kgWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja2.000kg/jam 1 pekerja dalam sehari dapat menyelesaikan 16.000kgWaktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=39.00 =3hariDipakai2tukang16.00Maka pekerjaan akan selesai dalam 3 =2hari2

JENIS PEKERJAAN :PEKERJAAN KUNCI

1. Pasangan kunci pintu silinderVolume =17.00bhWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja2bh/jam 1 pekerja dalam sehari dapat menyelesaikan 16.00bhWaktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=17.00 =2hariDipakai1tukang16.00Maka pekerjaan akan selesai dalam 2 =2hari12. Pasang Engsel PintuVolume =34.00bhWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja4.00bh/jam 1 pekerja dalam sehari dapat menyelesaikan 32.00bhWaktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=34.00 =2hariDipakai1tukang32.00Maka pekerjaan akan selesai dalam 2 =2hari13. Pasang Engsel JendelaVolume =52.00bhWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja3.50bh/jam 1 pekerja dalam sehari dapat menyelesaikan 28.00bhWaktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=52.00 =2hariDipakai1tukang28.00Maka pekerjaan akan selesai dalam 2 =2hari14. Pasangan grendel jendelaVolume =26.00bhWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja3.00bh/jam 1 pekerja dalam sehari dapat menyelesaikan 24.00bhWaktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=26.00 =2hariDipakai1tukang24.00Maka pekerjaan akan selesai dalam 2 =2hari1

JENIS PEKERJAAN :PEKERJAAN LANTAI DAN DINDING KERAMIK

1. Memasang 1 m2 Lantai Keramik 30 x 30 cmVolume =222.00m2Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja1.00m/jam 1 pekerja dalam sehari dapat menyelesaikan 8.00m2Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=222.00 =28hariDipakai4tukang8.00Maka pekerjaan akan selesai dalam 28 =7hari4

2. Memasang 1 m2 Lantai Keramik 20 x 20 cmVolume =134.40m2Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja1.00m/jam 1 pekerja dalam sehari dapat menyelesaikan 8.00m2Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=134.40 =17hariDipakai3tukang8.00Maka pekerjaan akan selesai dalam 17 =6hari33. Memasang 1 m2 Dinding Keramik 20x20 cm,Volume =39.24m2Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja1.00m/jam 1 pekerja dalam sehari dapat menyelesaikan 8.00m2Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=39.24 =5hariDipakai4tukang8.00Maka pekerjaan akan selesai dalam 5 =2hari4

JENIS PEKERJAAN :PLAFOND1. Pasang Plafond GypsumVolume =290.00m2Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja6.00m/jam 1 pekerja dalam sehari dapat menyelesaikan 48.000m2Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=290.00 =7hariDipakai3tukang48Maka pekerjaan akan selesai dalam 7 =3hari32. Memasang 1 m2 Rangka Langit-langit Volume =290.00m'Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja6.00m'/jam 1 pekerja dalam sehari dapat menyelesaikan 48.00m'Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=290.00 =7hariDipakai2tukang48Maka pekerjaan akan selesai dalam 7 =4hari23. Memasang 1 m1 List Plafond Gypsum MotifVolume =205.00mWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja2.50m/jam 1 pekerja dalam sehari dapat menyelesaikan 20.00mWaktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=205.00 =11hariDipakai3tukang20Maka pekerjaan akan selesai dalam 11 =4hari3

JENIS PEKERJAAN :INSTALASI LISTRIK

1. Instalasi Titik LampuVolume =24.00titikWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.60titik/jam 1 pekerja dalam sehari dapat menyelesaikan 4.8titikWaktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=24.00 =5hariDipakai3pekerja4.8Maka pekerjaan akan selesai dalam 5 =2hari32. Instalasi SaklarVolume =17.00titikWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.64titik/jam 1 pekerja dalam sehari dapat menyelesaikan 5.12titikWaktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=17.00 =4hariDipakai3pekerja5.12Maka pekerjaan akan selesai dalam 4 =2hari33. Fuse BoxVolume =1.00bhWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja1.00bh/jam 1 pekerja dalam sehari dapat menyelesaikan 8.00m'Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=1.00 =1hariDipakai1pekerja8Maka pekerjaan akan selesai dalam 1 =1hari14. Penyambungan dayaVolume =1.00bhWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja1.00bh/jam 1 pekerja dalam sehari dapat menyelesaikan 8.00m'Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=1.00 =1hariDipakai1pekerja8Maka pekerjaan akan selesai dalam 1 =1hari15. Pasangan kabel NYYVolume =236.39mWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja3.00m'/jam 1 pekerja dalam sehari dapat menyelesaikan 24.00m'Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=236.39 =10hariDipakai4pekerja24Maka pekerjaan akan selesai dalam 10 =3hari4

JENIS PEKERJAAN :ATAP

1. Pasang genteng Keramik multi roofVolume =199.76m2Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja1.00m/jam 1 pekerja dalam sehari dapat menyelesaikan 8.00m2Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=199.76 =25hariDipakai6pekerja8Maka pekerjaan akan selesai dalam 25 =5hari6

2. Pasang Rangka Atap Genteng Keramik, Kayu Klas IIVolume =3.80m3Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.03m/jam 1 pekerja dalam sehari dapat menyelesaikan 0.24m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=3.80 =16hariDipakai4tukang0.25Maka pekerjaan akan selesai dalam 16 =4hari42. Pasangan gording kayu bengkiraiVolume =1.23m3Dalam analisis digunakan koefisien0.32tukang Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.39m/jam 1 pekerja dalam sehari dapat menyelesaikan 3.120m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=1.23 =1hariDipakai4tukang3.125Maka pekerjaan akan selesai dalam 1 =1hari43. Pasang Lisplang Ukuran (2 x 20) cmVolume =0.22m2Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.03m/jam 1 pekerja dalam sehari dapat menyelesaikan 0.240m3Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=0.22 =1hariDipakai1tukang0.24Maka pekerjaan akan selesai dalam 1 =1hari14. Memasang Talang Jurai , Seng BJLS 0.30Volume =1.87m1Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja1.00m'/jam 1 pekerja dalam sehari dapat menyelesaikan 8.00m'Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=1.87 =1hariDipakai1pekerja8Maka pekerjaan akan selesai dalam 1 =1hari1

5. Pasang Konstruksi kuda-kuda kayu kruingVolume =1.18m10.41675Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.200m'/jam 1 pekerja dalam sehari dapat menyelesaikan 1.600m'Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=1.18 =1hariDipakai3tukang1.6Maka pekerjaan akan selesai dalam 1 =1hari3

JENIS PEKERJAAN :CAT

1. Pengecatan dindingVolume =1268.10m2Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja6.25m/jam 1 pekerja dalam sehari dapat menyelesaikan 50m2Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=1268.10 =26hariDipakai4pekerja50Maka pekerjaan akan selesai dalam 26 =7hari42. Pengecatan Bidang Kayu BaruVolume =9.16m2Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.50m/jam 1 pekerja dalam sehari dapat menyelesaikan 4m2Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=9.16 =3hariDipakai2pekerja4Maka pekerjaan akan selesai dalam 3 =2hari2

JENIS PEKERJAAN :SANITASI DAN INSTALASI AIR

1. Memasang 1 unit Closet Jongkok PorselenVolume =3.00buahWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.08bh/jam 1 pekerja dalam sehari dapat menyelesaikan 0.64buahWaktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=3.00 =5hariDipakai3pekerja0.64Maka pekerjaan akan selesai dalam 5 =2hari32. Memasang kran air diameter 3/4Volume =15.00buahWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.15bh/jam 1 pekerja dalam sehari dapat menyelesaikan 1.20buahWaktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=15.00 =13hariDipakai3pekerja1.2Maka pekerjaan akan selesai dalam 13 =5hari33. Membuat Septictank dan RembesanVolume =2.00buahWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.15bh/jam 1 pekerja dalam sehari dapat menyelesaikan 1.20buahWaktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=2.00 =2hariDipakai3pekerja1.2Maka pekerjaan akan selesai dalam 2 =1hari34. Memasang Bak Mandi Batu BataVolume =3.00buahWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.50bh/jam 1 pekerja dalam sehari dapat menyelesaikan 4.00buahWaktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=3.00 =1hariDipakai2pekerja4Maka pekerjaan akan selesai dalam 1 =1hari2

5. Memasang floor drainVolume =10.00buahWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja1.00bh/jam 1 pekerja dalam sehari dapat menyelesaikan 8.00buahWaktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=10.00 =2hariDipakai2pekerja8Maka pekerjaan akan selesai dalam 2 =1hari26. Memasang Wastafel Volume =10.00buahWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja1.00bh/jam 1 pekerja dalam sehari dapat menyelesaikan 8.00buahWaktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=10.00 =2hariDipakai2pekerja8Maka pekerjaan akan selesai dalam 2 =1hari27. Memasang Bak Cuci Stainless SteelVolume =4.00buahWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.50bh/jam 1 pekerja dalam sehari dapat menyelesaikan 4.00buahWaktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=4.00 =1hariDipakai1pekerja4Maka pekerjaan akan selesai dalam 1 =1hari18. Memasang 1 m' Pipa PVC tipe AW diameter 2Volume =38.00m'Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja1.00m'/jam 1 pekerja dalam sehari dapat menyelesaikan 8.00m'Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=38.00 =5hariDipakai5pekerja8Maka pekerjaan akan selesai dalam 5 =1hari5

9. Memasang 1 m' Pipa PVC tipe AW diameter 3Volume =39.00m'Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja1.00m'/jam 1 pekerja dalam sehari dapat menyelesaikan 8.00m'Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=39.00 =5hariDipakai5pekerja8Maka pekerjaan akan selesai dalam 5 =1hari510. Membuat Saluran Air BersihVolume =30.00m'Waktu kerja efektif 1 hari8jamKemampuan 1 pekerja1.00m'/jam 1 pekerja dalam sehari dapat menyelesaikan 8.00m'Waktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=30.00 =4hariDipakai4pekerja8Maka pekerjaan akan selesai dalam 4 =1hari411. Memasang Pompa AirVolume =2.00unitWaktu kerja efektif 1 hari8jamKemampuan 1 pekerja0.500unit/jam 1 pekerja dalam sehari dapat menyelesaikan 4.00unitWaktu yang diperlukan untuk menyelesaikan pekerjaanT =volume totalvolume yang diselesaikan pekerja&tukang / hari

=2.00 =1hariDipakai1pekerja4Maka pekerjaan akan selesai dalam 1 =1hari1

Surakarta, 11 Desember 2013PT. ARCI PROPERTY, TbkMUHAMAD ARDIAN, S.T, M.T Direktur Utama

HARIAN (2)RENCANA ANGGARAN BIAYA (RAB)

KEGIATAN: LOKASI: TAHUN ANGGARAN :

NO.URAIAN PEKERJAAN JUMLAH HARGA RPDurasi(hari)Bobot(%)MINGGU KE1234567891011121313141234567891011121314151617181920212223242526272829303132333435363738394041424344454647484950515253545556575859606162636465666768697071727374757677787980818283848586878889909192939495969798APEKERJAAN PERSIAPAN1Membersihkan Lapangan dan PeralatanRp2,688,125.0010.3470.34673480740.34673480742Pagar Sementara dari Seng Gelombang Tinggi 2 mRp35,015,622.5014.5174.51658130643Pengukuran dan Pemasangan BouwplankRp10,331,962.5011.3331.3326951045BPEKERJAAN TANAH1Galian Tanah Biasa Sedalam 2 meterRp9,284,423.6381.1980.14969694660.14969694660.14969694660.14969694660.14969694660.14969694660.14969694660.14969694662Urugan tanah kembaliRp2,772,019.7330.3580.11918539570.11918539570.11918539573Urugan Pasir Rp2,153,524.7340.2780.06944449950.06944449950.06944449950.0694444995CPEKERJAAN PONDASI1Pasang Pondasi Batu KosongRp5,740,786.8030.7400.24683011460.24683011460.24683011462Pasang Lantai Kerja Pondasi Foot platRp2,412,101.0210.3110.31113113493Pasang Pondasi batu kali 1 Pc: 5 PPRp20,606,483.2562.6580.44299682250.44299682250.44299682250.44299682250.44299682250.44299682254Pasang Pondasi Foot Plat (120 X 120)Rp11,292,233.7741.4570.36413954910.36413954910.36413954910.3641395491DPEKERJAAN DINDING DAN PLESTERAN1Pasang bata merah tebal 1/2 bata, 1 Pc : 5 Ps : 10PsrRp43,186,370.98145.5710.39789332780.39789332780.39789332780.39789332780.39789332780.39789332780.39789332780.39789332780.39789332780.39789332780.39789332780.39789332780.39789332780.39789332782Plesteran 1 Pc : 5Ps, tebal 12 mmRp39,763,429.8985.1290.64112370170.64112370170.64112370170.64112370170.64112370170.64112370170.64112370170.64112370173AcianRp19,528,801.6082.5190.31487166990.31487166990.31487166990.31487166990.31487166990.31487166990.31487166990.3148716699EPEKERJAAN BETON1Membuat beton tumbuk 1 Pc : 2 Ps : 3 KrRp4,732,398.1330.6100.20347356770.20347356770.20347356772Membuat Beton Sloof Beton BertulangRp54,596,599.2047.0421.76057115181.76057115181.76057115181.76057115183Membuat Kolom Beton Bertulang Rp142,426,782.00518.3713.6742579183.6742579183.6742579183.6742579183.6742579184Membuat Plat Beton Bertulang Rp67,981,875.0048.7692.19220482092.19220482092.19220482092.19220482095Membuat Balok Beton BertulangRp88,489,476.00311.4143.8046818783.8046818783.8046818786Membuat Beton Bordess dan Anak Tangga Rp16,034,026.3732.0680.689396890.689396890.68939689FPEKERJAAN KUSEN, PINTU, JENDELA1Pasang kusen pintu, jendela, ventilasi, bouven kayu kamferRp27,488,732.9123.5461.77285292021.7728529202GPEKERJAAN DAUN PINTU DAN JENDELA KACA1Pekerjaan Daun Pintu Rp8,560,506.5721.1040.55209962280.55209962282Pekerjaan Daun Jendela KacaRp255,816.0020.0330.01649854670.01649854673Pasang kaca mati tebal 5 mmRp2,276,422.4020.2940.14681513710.14681513714Pekerjaan AngkerRp2,456,185.0520.3170.15840871430.1584087143HPEKERJAAN KUNCI1Pasang Kunci SilinderRp2,752,618.7520.3550.17752685090.17752685092Pasang Engsel PintuRp599,462.5020.0770.03866161630.03866161633Pasang Engsel JendelaRp492,050.0020.0630.03173417570.03173417574Pasang Grendel JendelaRp503,912.5020.0650.03249923340.0324992334IPEKERJAAN LANTAI DAN DINDING KERAMIK1Memasang 1 m2 Lantai Keramik 30 x 30 cmRp32,036,971.3674.1320.59033888980.59033888980.59033888980.59033888980.59033888980.59033888980.59033888982Memasang 1 m2 Lantai Keramik 20 x 20 cmRp19,006,310.4062.4520.40859641180.40859641180.40859641180.40859641180.40859641180.40859641183Memasang 1 m2 Dinding Keramik 20x20 cm,Rp2,989,565.6220.3860.19280845550.1928084555JPEKERJAAN PLAFOND1Pasang Plafond GypsumRp8,867,765.0031.1440.38127725830.38127725830.38127725832Memasang 1 m2 Rangka Langit-langit Rp17,470,325.0042.2530.56336384790.56336384790.56336384790.56336384793Memasang 1 m1 List Plafond Gypsum MotifRp2,721,375.0040.3510.08775591130.08775591130.08775591130.0877559113KPEKERJAAN INSTALASI LISTRIK1Instalasi Titik LampuRp1,940,250.0020.2500.12513410090.12513410092Instalasi SaklarRp418,093.7520.0540.02696445590.02696445593Fuse BoxRp242,262.5010.0310.03124885984Penyambungan dayaRp128,250.0010.0170.01654266045Kabel NYY 2x4Rp5,459,131.5630.7040.2347201030.2347201030.234720103LPEKERJAAN ATAP1Pasang genteng Keramik multi roofRp14,240,619.1251.8370.36737267260.36737267260.36737267260.36737267260.36737267262Pasang Rangka Atap Genteng KeramikRp397,837.4440.0510.01282902470.01282902470.01282902470.01282902473Pasang Lisplang Ukuran (2 x 20) cmRp16,200.6510.0020.004Memasang Talang Jurai , Seng BJLS 0.30Rp315,007.7810.0410.04063209985Pasang Konstruksi kuda-kuda kayu kruingRp9,582,600.8711.2361.2360367416MPEKERJAAN PENGECATAN1Pengecatan Tembok baruRp15,943,237.5472.0560.29378286240.29378286240.29378286240.29378286240.29378286240.29378286240.29378286242Pengecatan Bidang Kayu BaruRp212,664.9220.0270.01371556920.0137155692NPEKERJAAN SANITASI DAN DRAINASE1Memasang 1 unit Closet Jongkok PorselenRp1,131,862.5020.1460.07299811690.07299811692Memasang kran air diameter 3/4Rp275,625.0050.0360.00711044180.00711044180.00711044180.00711044180.00711044183Membuat Septictank dan RembesanRp377,722.0010.0490.04872145644Memasang Bak Mandi Batu BataRp3,004,513.6410.3880.38754502015Memasang floor drainRp308,125.0010.0400.0397443066Memasang Wastafel Rp10,578,500.0011.3641.36449538637Memasang Bak Cuci Stainless SteelRp787,515.0010.1020.10157967438Memasang 1 m' Pipa PVC tipe AW diameter 2Rp209,654.9710.0270.02704289299Memasang 1 m' Pipa PVC tipe AW diameter 3Rp604,433.3810.0780.077964413810Membuat Saluran Air BersihRp993,102.5010.1280.128097913611Memasang Pompa AirRp586,015.2010.0760.0755886975Rp775,268,286.44100.000RENCANAPER MINGGU4.86331611381.67942991190.14969694660.14969694660.14969694660.14969694660.21914144610.77710269560.83011110990.83011110990.80713637170.80713637170.44299682250.56218221820.56218221820.56218221821.76057115181.76057115185.43482906975.43482906973.6742579183.6742579183.6742579180.20347356774.69755233574.69755233574.4940787680.39789332782.59009814872.59009814872.59009814872.59009814871.63393006940.41072235250.41072235250.41072235250.41072235250.76526600041.40638970211.40638970211.40638970211.00849637432.45669840452.97734046982.18164509912.18164509911.41967170051.06826736711.07876759951.105412462.44241665081.86036424262.25645133510.9935356230.87028321880.87028321880.72346808170.50768012540.19280845550.30749843160.30749843160.29378286240.29378286240.29378286240.29378286240.293782862400000000000000000000000000000000KUMULATIF4.86331611386.54274602576.69244297246.8421399196.99183686577.14153381237.36067525858.13777795418.9678890649.798000173910.605136545511.412272917211.855269739712.41745195812.979634176213.541816394415.302387546217.06295869822.497787767727.932616837431.606874755435.281132673338.955390591339.15886415943.856416494748.553968830353.048047598353.445940926156.036039074858.626137223461.216235372163.806333520865.440263590265.850985942766.261708295266.672430647767.083153000267.848419000769.254808702870.661198404972.06758810773.076084481375.532782885778.510123355580.691768454682.873413553884.293085254385.361352621486.440120220987.545532680989.987949331691.848313574294.104764909395.098300532495.968583751296.838866969997.562335051698.07001517798.262823632598.570322064198.877820495699.17160335899.465386220499.7591690827100.0529519451100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074100.3467348074REALISASIPER MINGGUKUMULATIFDeviasiPER MINGGUKUMULATIF

BARCHATPT. ARCI PROPERTYJalan Martadinata 68, Jebres, Surakarta, Jawa tengahTelepon :(0271)628133Email: [email protected]

TAHUN 2013

NoUraian pekerjaanwaktu (minggu)sub total (Rp)Bobot (%)MINGGU KE1234567891011APEKERJAAN PERSIAPAN1Rp48,035,710.006.196BPEKERJAAN TANAH3Rp14,209,968.081.833CPEKERJAAN PONDASI2Rp40,051,604.845.166DPEKERJAAN DINDING DAN PLESTERAN6Rp102,478,602.4713.218EPEKERJAAN BETON3Rp374,261,156.6948.275FPEKERJAAN KUSEN, PINTU, JENDELA1Rp27,488,732.913.546GPEKERJAAN DAUN PINTU DAN JENDELA2Rp13,548,930.021.748HPEKERJAAN KUNCI1Rp4,348,043.750.561IPEKERJAAN LANTAI DAN DINDING KERAMIK3Rp54,032,847.386.970JPEKERJAAN PLAFOND2Rp29,059,465.003.748KPEKERJAAN INSTALASI LISTRIK1Rp8,187,987.811.056LPEKERJAAN ATAP3Rp24,552,265.863.167MPEKERJAAN PENGECATAN2Rp16,155,902.462.084NPEKERJAAN SANITASI DAN DRAINASE2Rp18,857,069.182.432NILAI TOTAL32Rp775,268,286.44100.000Surakarta, 11 Desember 2013PT. ARCI PROPERTY, TbkMUHAMAD ARDIAN, S.T, M.TDirektur Utama

Kurva S 2PT. ARCI PROPERTYJalan Martadinata 68, Jebres, Surakarta, Jawa tengahTelepon :(0271)628133Email: [email protected]

NoUraian pekerjaanwaktu (minggu)sub total (Rp)Bobot (%)MINGGU KE1234567891011APEKERJAAN PERSIAPAN1Rp48,035,710.006.1966.196BPEKERJAAN TANAH3Rp14,209,968.081.8330.6110.6110.611CPEKERJAAN PONDASI2Rp40,051,604.845.1662.5832.583DPEKERJAAN DINDING DAN PLESTERAN6Rp102,478,602.4713.2182.2032.2032.2032.2032.2032.203EPEKERJAAN BETON3Rp374,261,156.6948.27516.09216.09216.092FPEKERJAAN KUSEN, PINTU, JENDELA1Rp27,488,732.913.5463.546GPEKERJAAN DAUN PINTU DAN JENDELA2Rp13,548,930.021.7480.8740.874HPEKERJAAN KUNCI1Rp4,348,043.750.5610.561IPEKERJAAN LANTAI DAN DINDING KERAMIK3Rp54,032,847.386.9702.3232.3232.323JPEKERJAAN PLAFOND3Rp29,059,465.003.7481.2491.2491.249KPEKERJAAN INSTALASI LISTRIK1Rp8,187,987.811.0561.056LPEKERJAAN ATAP3Rp24,552,265.863.1671.0561.0561.056MPEKERJAAN PENGECATAN2Rp16,155,902.462.0841.0421.042NPEKERJAAN SANITASI DAN DRAINASE2Rp18,857,069.182.4321.2161.216NILAI TOTAL33Rp775,268,286.44100.000RENCANAPER MINGGU6.8073.19419.28616.09218.2953.2593.25911.4008.4277.6912.291KUMULATIF6.80710.00129.28745.37863.67366.93270.19181.59190.01797.709100.000

Surakarta, 11 Desember 2013PT. ARCI PROPERTY, TbkMUHAMAD ARDIAN, S.T, M.T Direktur Utama

TABEL PDMPT. ARCI PROPERTYJalan Martadinata 68, Jebres, Surakarta, Jawa tengahTelepon :(0271)628133Email: [email protected]

NoUraian pekerjaanDURASI ( HARI )KONSTRAIN

APEKERJAAN PERSIAPAN2BPEKERJAAN TANAH14FS( A - B )0CPEKERJAAN PONDASI9SS( B - C )5FF( B - C )0DPEKERJAAN DINDING DAN PLESTERAN31SS( E - D )12FF( E - D )26EPEKERJAAN BETON17FS( C - E )0FPEKERJAAN KUSEN, PINTU, JENDELA2SS( D - F ) 14GPEKERJAAN DAUN PINTU DAN JENDELA6SS( D - G )22FF( H - G ) 2FF( F - G )12HPEKERJAAN KUNCI4SS( D - H )22IPEKERJAAN LANTAI DAN DINDING KERAMIK15FS( L - I )1JPEKERJAAN PLAFOND11FS( L - J )0KPEKERJAAN INSTALASI LISTRIK4SS( J - K )1SS( D - K )16FF( D - K )11LPEKERJAAN ATAP11FS( E - L )-1MPEKERJAAN PENGECATAN7FS( G - M )3FS( D - M )0NPEKERJAAN SANITASI DAN DRAINASE7SS( I - N )3FF( I - N )-5224PEKERJAAN PERSIAPAN ( A )PEKERJAAN KUSEN, PINTU, JENDELA ( F )PEKERJAAN INSTALASI LISTRIK ( K )

Surakarta, 11 Desember 2013PT. ARCI PROPERTY, Tbk14611PEKERJAAN TANAH ( B )PEKERJAAN DAUN PINTU DAN JENDELA ( G )PEKERJAAN ATAP ( L )

MUHAMMAD ARDIAN, S.T, M.T947Direktur UtamaPEKERJAAN PONDASI ( C )PEKERJAAN KUNCI ( H )PEKERJAAN PENGECATAN ( M )

31157PEKERJAAN DINDING DAN PLESTERAN ( D )PEKERJAAN LANTAI DAN DINDING KERAMIK ( I )PEKERJAAN SANITASI DAN DRAINASE ( N )

1711PEKERJAAN BETON ( E )PEKERJAAN PLAFOND ( J )

GRAFIK PDMPT. ARCI PROPERTYJalan Martadinata 68, Jebres, Surakarta, Jawa tengahTelepon :(0271)628133Email: [email protected]

FS ( L - I ) = 1441559PEKERJAAN LANTAI DAN DINDING KERAMIK ( I ) FF ( I - N ) = -551766FS ( E - L ) = -1321143 SS ( I - N ) = 3PEKERJAAN ATAP ( L )3975043115447754FS ( L - J ) = 0PEKERJAAN PLAFOND ( J )PEKERJAAN SANITASI DAN DRAINASE ( N )55126654761FS ( A - B ) = 021416 FF ( B - C ) = 0 SS ( D - G ) = 2250656 FF ( J - K ) = -6PEKERJAAN TANAH ( B )PEKERJAAN DAUN PINTU DAN JENDELA ( G )2016 SS ( J - K ) = 150056FF ( H - G ) = 2

022 SS ( D - K ) = 1644448PEKERJAAN PERSIAPAN ( A ) SS ( B - C ) = 5PEKERJAAN INSTALASI LISTRIK ( K )002561260 FS ( G - M ) = 37916FS ( C - E ) = 0PEKERJAAN PONDASI ( C )7016FF ( D - K ) = -11 SS ( D - F ) = 14161733 FF ( E - D ) = 264224459766PEKERJAAN BETON ( E )PEKERJAAN KUSEN, PINTU, JENDELA ( F )FF ( F - G ) = 12 PEKERJAAN PENGECATAN ( M )1603342044 FS ( D - M ) = 0 59066283159PEKERJAAN DINDING DAN PLESTERAN ( D ) SS ( E - D ) = 122805950