RENCANA PROGRAM INVESTASI JANGKA MENENGAH PDAM ( 2011 - 2015 )
NO PDAM KEGIATAN
KEBUTUHAN SUMBER PEMBIAYAAN ( RP JUTA )
RENCANA INVESTASI
PDAM
APBD
APBN
RENCANA
KPS KETPENAMBAHAN ( RP JUTA ) KAB./ APBD TOTAL PINJAMAN
SR 2011 - 2015 KOTA PROV BANK
1 2 3 4 5 6 7 8 9 10 11 12 13
I UNIT AIR BAKU :
1 KOTA TARAKAN 28,000 A LOKASI KAMPUNG BUGIS
1.
Debit Sungai Aliran rata2: 60 L/dt
B LOKASI PERSEMAIAN
A.
1. SUMBER : Air Permukaan ( Sungai Persemaian )
Debit Sungai Aliran rata2 : 100 L/dt
2 Embung Persemaian Tampungan : 130.000 M3
C LOKASI JUATA LAUT
1.
Debit sungai Aliran rata2 : 30 L/dt
2 Embung Bengawan Tampungan : 145.000 M3 30,000.00 30,000.00 30,000.00
D LOKASI KAMP. 1
1.
Debit sungai Aliran rata2 : 75 L/dt2 Embung Binalatung Tampungan : 500.000 M3
3 Embung Binalatung Tahap II : 250.000 M3 80,000.00 80,000.00 80,000.00 4 Embung Binalatung Tahap III : 150.000 M3 35,000.00 35,000.00 35,000.00
E LOKASI PANTAI AMAL
1.
Debit sungai Aliran rata2 : 50 L/dt2 Embung Binalatung Tampungan : 200.000 M3 50,000.00 50,000.00 50,000.00
JUMLAH ( I ) 195,000.00 195,000.00
SUMBER : Air Permukaan ( Sungai Kamp. Bugis )
UNIT AIR BAKU :
SUMBER : Air Permukaan ( Sungai Semunti )
SUMBER : Air Permukaan ( Sungai Binalatung )
SUMBER : Air Permukaan ( Sungai Batu Mapan )
NO PDAM KEGIATAN
KEBUTUHAN SUMBER PEMBIAYAAN ( RP JUTA )
RENCANA INVESTASI
PDAM
APBD
APBN
RENCANA
KPS KETPENAMBAHAN ( RP. JUTA ) KAB./ APBD TOTAL PINJAMAN
SR 2011 - 2015 KOTA PROV BANK
1 2 3 4 5 6 7 8 9 10 11 12 13
II TRANSMISI AIR BAKU :
1 Sistem Zona Kampung Satu
pipa dia.300 mm, L = 600m 1,530.00 1,530.00 1,530.00
2 Sistem Zona Pantai Amal
pipa dia.250 mm, L = 750 m 712.50 712.50 712.50
3 Sistem Zona Persemaian
pipa dia.300 mm, L = 500 m 1,275.00 1,275.00 1,275.00
4 Sistem Zona Juata Laut
pipa dia.250 mm, L = 5.000 m 4,750.00 4,750.00 4,750.00
III UNIT PRODUKSI :
1 IPA 200 l/dt (Kampung Satu) 22,000.00 22,000.00 22,000.00
- Pompa Air Baku 200 l/dt h=50 m 10,500.00 10,500.00 10,500.00
2 IPA 250 l/dt (Persemaian) 30,000.00 30,000.00 30,000.00
3 IPA 60 L/det (wil.Juata Laut) 8,000.00 8,000.00 8,000.00
4 IPA 60 L/det (wil.Pantai Amal) 7,500.00 7,500.00 7,500.00
JUMLAH ( II ) & (III) 86,267.50 86,267.50
NO PDAM KEGIATAN
KEBUTUHAN SUMBER PEMBIAYAAN ( RP JUTA )
RENCANA INVESTASI
PDAM
APBD
APBN
RENCANA
KPS KETPENAMBAHAN ( RP JUTA ) KAB./ APBD TOTAL PINJAMAN
SR 2011 - 2015 KOTA PROV BANK
1 2 3 4 5 6 7 8 9 10 11 12 13
IV UNIT DISTRIBUSI :
1 Wil. Juata Laut
- jaringan pipa. Dia.100 mm - 50 mm di Perum intraca 4,207.50 4,207.50 4,207.50
- jaringan pipa dia.150 mm - 50 mm di Perum PNS Juata 20,260.37 10,130.19 10,130.19 20,260.37
2 Wil. Kamp Satu
Booster Pump dan kelengkapannya 10 l/dt 2,500.00 2,500.00 2,500.00
(wil. Mamburungan Timur)
3 Wil. Kamp Bugis & Persemaian
- Jaringan Distribusi Induk
Dia. 400 :L = 4.226 m 6,475.92 6,475.92 6,475.92
Dia. 300 : L = 956 m 911.93 911.93 911.93
- Jaringan Distribusi Bagi -
Dia. 250 : 1821 m 1,092.60 1,092.60 1,092.60
Dia. 200 : 600 m 292.80 292.80 292.80
Dia. 150 : 2856 m 705.43 705.43 705.43
Dia. 100 : 3583 m 419.21 419.21 419.21
- Jarinan distribusi Tambahan ( wil Persemaian )
Dia. 100 mm - 50 mm : 5000m 6,000.00 6,000.00 6,000.00
Accessories 1,979.58 1,979.58 1,979.58
4 Reservoir
Rencana Penambahan
10,250.00 10,250.00 10,250.00
1,200.00 1,200.00 1,200.00
V PELAYANAN SR :
Penambahan SR = 28.000 unit 28,000.00 14,000.00 14,000.00 28,000.00
JUMLAH (IV) & ( V ) 14,000.00 28,337.69 22,027.21 19,930.45 84,295.34
1. Kampung Satu : 1500 m³
2. Persemaian : 500 m³
JUMLAH (IV) & ( V ) 14,000.00 28,337.69 22,027.21 19,930.45 84,295.34
JUMLAH GRAND TOTAL = ( I + II + III + IV + V ) 14,000.00 28,337.69 22,027.21 301,197.95 365,562.84
TINGKAT NRW
Tarif Rata - Rata Rp = 5.052/ M3
Tarif FCR Rp = 3.587 / M3
Rencana Pemenuhan FCR TAHUN : 2013
KETERANGAN : (* ) DIURAIKAN LEBIH TERINCI (DED ) PANJANG PIPA & DIAMETER PIPA Tarakan, 25 FEBRUARI 2014
(** )= ALOKASI APBN UNTUK PENJAMINAN AIR BAKU DIREKSI PDAM TIRTA ALAM
KOTA TARAKAN
AGUS ADNA, STDIREKTUR UTAMA
RENCANA PROGRAM INVESTASI JANGKA MENENGAH PDAM ( 2011 - 2015 )
NO PDAM KEGIATAN
KEBUTUHAN SUMBER PEMBIAYAAN ( RP JUTA )
RENCANA INVESTASI
PDAM
APBD
APBN
RENCANA
KPS KETPENAMBAHAN ( RP JUTA ) KAB./ APBD TOTAL PINJAMAN
SR 2011 - 2015 KOTA PROV BANK
1 2 3 4 5 6 7 8 9 10 11 12 13
I UNIT AIR BAKU :
1 KOTA TARAKAN 28,000 A LOKASI KAMPUNG BUGIS
1.
Debit Sungai Aliran rata2: 60 L/dt
B LOKASI PERSEMAIAN
A.
1. SUMBER : Air Permukaan ( Sungai Persemaian )
Debit Sungai Aliran rata2 : 100 L/dt
2 Embung Persemaian Tampungan : 130.000 M3
C LOKASI JUATA LAUT
1.
Debit sungai Aliran rata2 : 30 L/dt
2 Embung Bengawan Tampungan : 145.000 M3 30,000.00 30,000.00 30,000.00
D LOKASI KAMP. 1
1.
Debit sungai Aliran rata2 : 75 L/dt2 Embung Binalatung Tampungan : 500.000 M3
3 Embung Binalatung Tahap II : 250.000 M3 80,000.00 80,000.00 80,000.00 4 Embung Binalatung Tahap III : 150.000 M3 35,000.00 35,000.00 35,000.00
E LOKASI PANTAI AMAL
1.
Debit sungai Aliran rata2 : 50 L/dt2 Embung Binalatung Tampungan : 200.000 M3 50,000.00 50,000.00 50,000.00
JUMLAH ( I ) 195,000.00 195,000.00
SUMBER : Air Permukaan ( Sungai Kamp. Bugis )
UNIT AIR BAKU :
SUMBER : Air Permukaan ( Sungai Semunti )
SUMBER : Air Permukaan ( Sungai Binalatung )
SUMBER : Air Permukaan ( Sungai Batu Mapan )
NO PDAM KEGIATAN
KEBUTUHAN SUMBER PEMBIAYAAN ( RP JUTA )
RENCANA INVESTASI
PDAM
APBD
APBN
RENCANA
KPS KETPENAMBAHAN ( RP. JUTA ) KAB./ APBD TOTAL PINJAMAN
SR 2011 - 2015 KOTA PROV BANK
1 2 3 4 5 6 7 8 9 10 11 12 13
II TRANSMISI AIR BAKU :
1 Sistem Zona Kampung Satu
pipa dia.300 mm, L = 600m 1,530.00 1,530.00 1,530.00
2 Sistem Zona Pantai Amal
pipa dia.250 mm, L = 750 m 712.50 712.50 712.50
3 Sistem Zona Persemaian
pipa dia.300 mm, L = 500 m 1,275.00 1,275.00 1,275.00
4 Sistem Zona Juata Laut
pipa dia.250 mm, L = 5.000 m 4,750.00 4,750.00 4,750.00
III UNIT PRODUKSI :
1 IPA 200 l/dt (Kampung Satu) 22,000.00 22,000.00 22,000.00
- Pompa Air Baku 200 l/dt h=50 m 10,500.00 10,500.00 10,500.00
2 IPA 250 l/dt (Persemaian) 30,000.00 30,000.00 30,000.00
3 IPA 60 L/det (wil.Juata Laut) 8,000.00 8,000.00 8,000.00
4 IPA 60 L/det (wil.Pantai Amal) 7,500.00 7,500.00 7,500.00
JUMLAH ( II ) & (III) 86,267.50 86,267.50
NO PDAM KEGIATAN
KEBUTUHAN SUMBER PEMBIAYAAN ( RP JUTA )
RENCANA INVESTASI
PDAM
APBD
APBN
RENCANA
KPS KETPENAMBAHAN ( RP JUTA ) KAB./ APBD TOTAL PINJAMAN
SR 2011 - 2015 KOTA PROV BANK
1 2 3 4 5 6 7 8 9 10 11 12 13
IV UNIT DISTRIBUSI :
1 Wil. Juata Laut
- jaringan pipa. Dia.100 mm - 50 mm di Perum intraca 4,207.50 4,207.50 4,207.50
- jaringan pipa dia.150 mm - 50 mm di Perum PNS Juata 20,260.37 10,130.19 10,130.19 20,260.37
2 Wil. Kamp Satu
Booster Pump dan kelengkapannya 10 l/dt 2,500.00 2,500.00 2,500.00
(wil. Mamburungan Timur)
3 Wil. Kamp Bugis & Persemaian
- Jaringan Distribusi Induk
Dia. 400 :L = 4.226 m 6,475.92 6,475.92 6,475.92
Dia. 300 : L = 956 m 911.93 911.93 911.93
- Jaringan Distribusi Bagi -
Dia. 250 : 1821 m 1,092.60 1,092.60 1,092.60
Dia. 200 : 600 m 292.80 292.80 292.80
Dia. 150 : 2856 m 705.43 705.43 705.43
Dia. 100 : 3583 m 419.21 419.21 419.21
- Jarinan distribusi Tambahan ( wil Persemaian )
Dia. 100 mm - 50 mm : 5000m 6,000.00 6,000.00 6,000.00
Accessories 1,979.58 1,979.58 1,979.58
4 Reservoir
Rencana Penambahan
10,250.00 10,250.00 10,250.00
1,200.00 1,200.00 1,200.00
V PELAYANAN SR :
Penambahan SR = 28.000 unit 28,000.00 14,000.00 14,000.00 28,000.00
JUMLAH (IV) & ( V ) 14,000.00 28,337.69 22,027.21 19,930.45 84,295.34
1. Kampung Satu : 1500 m³
2. Persemaian : 500 m³
JUMLAH (IV) & ( V ) 14,000.00 28,337.69 22,027.21 19,930.45 84,295.34
JUMLAH GRAND TOTAL = ( I + II + III + IV + V ) 14,000.00 28,337.69 22,027.21 301,197.95 365,562.84
TINGKAT NRW
Tarif Rata - Rata Rp = 5.052/ M3
Tarif FCR Rp = 3.587 / M3
Rencana Pemenuhan FCR TAHUN : 2013
KETERANGAN : (* ) DIURAIKAN LEBIH TERINCI (DED ) PANJANG PIPA & DIAMETER PIPA Tarakan, 25 FEBRUARI 2014
(** )= ALOKASI APBN UNTUK PENJAMINAN AIR BAKU DIREKSI PDAM TIRTA ALAM
KOTA TARAKAN
AGUS ADNA, STDIREKTUR UTAMA
KEGIATAN OPTIMALISASI ( 2014-2019 )
KEG
IATA
N O
PTIM
ALIS
ASI PROJECT TASKS INVESTASI 2014-2019 2014 2015
Instalasi Penolahan Air ( IPA ) Kampung Satu 79,942,500,000 50,155,000,000 27,162,500,000
Instalasi Pengolahan Air ( IPA ) Kampung Bugis 99,771,118,125 11,900,000,000 65,237,000,000
Instalasi Pengolahan Air ( IPA ) Persemaian 59,862,500,000 23,775,000,000 12,012,500,000
Instalasi Pengolahan Air ( IPA ) Juata Laut 29,822,500,000 9,100,000,000 9,897,500,000
Grand Total 269,398,618,125 94,930,000,000 114,309,500,000
KEGIATAN PENGEMBANGAN ( 2014-2019 )
KEG
IATA
N P
ENG
EMBA
NG
AN
PROJECT TASKS INVESTASI 2014-2019 2014 2015
Instalasi Kampung Satu 193,726,930,000 32,321,930,000 28,000,000,000
Instalasi Kampung Bugis 61,252,100,000 8,000,000,000 22,672,500,000
Instalasi Persemaian 41,020,000,000 19,770,000,000 9,700,000,000
Instalasi Juata Laut 195,421,200,000 2,849,700,000 20,950,000,000
Instalasi Pantai Amal 163,852,400,000 300,000,000 98,650,000,000
Instalasi Rawasari 64,121,500,000 1,800,000,000 60,300,000,000
Instalasi Batu Mapan 70,521,500,000 1,800,000,000 66,700,000,000
Grand Total 789,915,630,000 66,841,630,000 306,972,500,000
URAIAN KEGIATAN OPTIMALISASI ( 2014-2019 )
IPA
KA
MP
UN
G S
AT
U
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) :1 Perbaikan Pintu Air 2,500,000,000 2,500,000,000 -2 Normalisasi Das Aliran Sungai ( DAS ) 900,000,000 150,000,000 150,000,000 3 Pembuatan Ponton Intake Embung Binalatung & Jaringan Transmisi Air Baku 2,000,000,000 2,000,000,000 4 Pengadaan & Pemasangan Pompa Submersible kap.250 l/det H=40m 1,000,000,000 1,000,000,000 II UNIT PENGOLAHAN :1 Rencana Pekerjaan Bongkar/Pasang Instalasi Pengolahan Air (IPA) 30 l/det dan 60 l/det 2,000,000,000 2,000,000,000 -2 Pembuatan Sarana Olah Raga bagi Masyarakat sekitar 750,000,000 750,000,000 3 Sistem Scada Pengolahan Air 90 lt/det 4,000,000,000 4,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA KAMP. SATU ) :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED ) 500,000,000 500,000,000 -2 Rehabilitasi Pipa Jaringan ( Kelurahan Kp. Empat - Kamp. Enam ) 30,000,000,000 30,000,000,000 -3 Rehabilitasi Pipa Jaringan Kelurahan Lingkas Ujung 3,000,000,000 3,000,000,000 -4 Rehabilitasi Pipa Jaringan Kelurahan Gn Lingkas - Kelurahan Sebengkok 5,000,000,000 2,500,000,000 2,500,000,000 5 Rehabilitasi Pipa Jaringan Kelurahan Pamusian 3,000,000,000 1,500,000,000 1,500,000,000 6 SPAM MBR P/P Jaringan Perpipaan Optimalisasi ( Mamburungan ) 5,000,000,000 3,500,000,000 1,500,000,000 7 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME ( Boster PUMP ) 1,500,000,000 - 1,500,000,000 8 Boster Pump Gunung Lingkas & Reservoar 250 m3 5,000,000,000 5,000,000,000 9 Boster Pump Kamp.Empat & Reservoar 250 m3 5,000,000,000 5,000,000,000 IV UNIT SAMBUNGAN RUMAH :1 Rehabilitasi Sambungan Pipa Dinas dan Meter Air 2,812,500,000 375,000,000 412,500,000 2 Pengadaan & Pemasangan SR 5,980,000,000 3,380,000,000 2,600,000,000
Sub Total 79,942,500,000 50,155,000,000 27,162,500,000
IPA
KA
MP
UN
G B
UG
IS
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) :1 Perbaikan Pintu Air 2,500,000,000 2,500,000,000 2 Normalisasi Das Aliran Sungai ( DAS ) 1,500,000,000 - 1,500,000,000 3 Pembangunan Folder 15,000,000,000 15,000,000,000 II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 1,500,000,000 1,500,000,000 - 2 Rehabilitasi / Penambahan Daya Listrik PLN ( 197 KVA + 78 KVA ) > Total +/- = 350 KVA 1,500,000,000 1,500,000,000 3 Rehabilitasi / Pembangunan Ruang gardu duduk/Panel Indux ( Trapo 350 KVA, cubical, Incoming out Going ) 3,500,000,000 3,500,000,000 4 Rehabilitasi Meter Indux ( Digital ) Air Baku, Pencuciaan ( Filter ) & Distribusi 4,000,000,000 2,000,000,000 5 Rehabilitasi sistim Pencucian Filter ( Gate Valve ), Tube setler dan Ruang Thomson 5,000,000,000 3,000,000,000 6 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME 5,000,000,000 3,000,000,000 7 Sistem Scada Pengolahan Air 60 lt/det 650,000,000 650,000,000 8 Pengadaan & Pemasangan Pompa kap.60 lt/det H=70 m 2,500,000,000 2,500,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA KAMP.BUGIS ) :1 Rehabilitasi Pipa Jaringan Jln Jend Sudirman ( Perempatan THM s/d Gedung Gitajalatama ) 4,000,000,000 4,000,000,000 -2 Rehabilitasi Pipa Jaringan Kelurahan Kr. Anyar - Kelurahan Sebengkok 7,000,000,000 7,000,000,000 3 Rehabilitasi/Optimalisasi sistim NRW ( Penekanan Tingkat Kebocoran ) Distrik Metrik Area 6,000,000,000 3,500,000,000 4 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME ( Boster PUMP ) 4,000,000,000 - 4,000,000,000 5 Rehabilitasi sistim Perpipaan Jalur Yos Sudarso 1,000,000,000 1,000,000,000 6 Rehabilitas Reservoar 500 m3 & Perpipaan (gravitasi Karang Anyar s/d Sebengkok) 1,500,000,000 1,500,000,000 7 Pemutahiran Program GIS 1,500,000,000 1,500,000,000 IV UNIT SAMBUNGAN RUMAH :1 Rehabilitasi Sambungan Pipa Dinas dan Meter Air 11,573,415,000 1,500,000,000 1,650,000,000 2 Pengadaan & Pemasangan SR 3,900,000,000 1,300,000,000 1,300,000,000 V UNIT SARANA PRASARANA KANTOR & PELAYANAN :1 Gedung Kantor 7,500,000,000 7,500,000,000 2 Perluasan Kantor Pelayanan 500,000,000 500,000,000 3 Rehabilitasi Kantor Pelayanan 450,000,000 450,000,000 4 Perbaikan Jalan lingkungan 250,000,000 250,000,000 5 Kendaraan Operasional (Roda empat & dua) 2,175,000,000 2,100,000,000 75,000,000 6 pemutahiran Program Reading & Billing 5,772,703,125 750,000,000 612,000,000
Sub Total 99,771,118,125 11,900,000,000 65,237,000,000
IPA
PE
RSE
MA
IAN
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) : 4861 Perbaikan Pintu Air 1,000,000,000 1,000,000,000 2 Normalisasi Das Aliran Sungai ( DAS ) 2,500,000,000 500,000,000 3 Pembangunan Folder S Persemaian (DED & Konstruksi) 15,500,000,000 II UNIT PENGOLAHAN :1 Rehabilitasi / Penambahan Daya Listrik PLN (2 x 197 KVA, Embung 66 KVA ) + 92 KVA > Total +/- = 60 1,000,000,000 1,000,000,000 -2 Rehabilitasi / Pembangunan Ruang gardu duduk/Panel Indux ( Trapo 1250 KVA, Kubical, Incoming out Going 2,000,000,000 2,000,000,000 -3 Rehabilitasi Meter Indux ( Digital ) Air Baku, Pencuciaan ( Filter ) & Distribusi 2,000,000,000 1,500,000,000 2,000,000,000 4 Rehabilitasi sistim Pencucian Filter ( Gate Valve ), Tube setler 3,000,000,000 3,000,000,000 -5 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME 3,000,000,000 3,000,000,000 -6 Perbaikan Reservoir 500 m3 1,500,000,000 1,500,000,000 -7 Interkoneksi Jaringan Distribusi /Pompa 1,000,000,000 1,000,000,000 8 Rehab Jaringan Distribusi Akibalak- Lestari 500,000,000 500,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA PERSEMAIAN ) WILAYAH JALUR YOS.S & L.UJUNG :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 300,000,000 300,000,000 -2 3,400,000,000 3,400,000,000 -3 2,000,000,000 2,000,000,000 -4 1,400,000,000 1,400,000,000 -5 SPAM MBR P/P Jaringan Perpipaan Optimalisasi Kota Tarakan 3,000,000,000 3,000,000,000 -6 Rehabilitasi/Optimalisasi sistim NRW ( Penekanan Tingkat Kebocoran ) Distrik Metrik Area 3,000,000,000 3,000,000,000 7 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME ( Boster PUMP ) 2,500,000,000 - 2,500,000,000 8 Interkoneksi Jaringan Distribusi Reservoar Peningki-Jl.Cendawasih 450,000,000 450,000,000 IV UNIT SAMBUNGAN RUMAH :1 Rehabilitasi Sambungan Pipa Dinas dan Meter Air 2,812,500,000 375,000,000 412,500,000 2 Pengadaan & Pemasangan SR 6,500,000,000 1,300,000,000 650,000,000
Sub Total 58,362,500,000 23,775,000,000 12,012,500,000
SPAM Khusus KEK ( P/P Pipa HDPE Ø 150 mm - Ø 75 mm, Panjang = 8.200 m' )SPAM MBR P/P Pipa HDPE Ø 150 mm-Ø 75 mm ( IKK Persemaian, Kr.Harapan,Kec.Tarakan Barat )SPAM Khusus PPI Tengkayu II ( P/P Pipa HDPE Ø 150 mm - Ø 75 mm, Panjang = 2.815 m' )
IPA
JU
AT
A L
AU
T
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) :1 Perbaikan Pintu Air & Pemasangan turap siring 1,000,000,000 1,000,000,000 -2 Normalisasi Das Aliran Sungai ( DAS ) 450,000,000 75,000,000 75,000,000 II UNIT PENGOLAHAN :1 Rehabilitasi / Penambahan Daya Listrik PLN (82.500 KVA + 67,500 KVA > Total +/- = 150 KVA 1,000,000,000 1,000,000,000 -2 Rehabilitasi / Pembangunan Ruang gardu duduk/Panel Indux ( Trapo 200 KVA, Kubical, Incoming out Going 1,500,000,000 1,500,000,000 -1 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME 6,500,000,000 1,500,000,000 1,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA JUATA LAUT ) WILAYAH PERUM PNS, KORPRI & INTRACA : 1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 1,000,000,000 1,000,000,000 2 Rehabilitasi Jaringan Pipa Transmisi / Distribusi Air Bersih 4,000,000,000 4,000,000,000 3 Rehabilitasi Jaringan Pipa Distribusi Air Bersih 3,000,000,000 2,000,000,000 1,000,000,000 4 Rehabilitasi/Optimalisasi sistim NRW ( Penekanan Tingkat Kebocoran ) Distrik Metrik Area 2,000,000,000 500,000,000 5 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME ( Boster PUMP ) 3,000,000,000 - - 6 Laboratorium & Gudang, Jalan Lingkungan, dll 2,000,000,000 1,000,000,000 1,000,000,000 IV UNIT SAMBUNGAN RUMAH :1 Rehabilitasi Sambungan Pipa Dinas dan Meter Air 2,812,500,000 375,000,000 412,500,000 2 Pengadaan & Pemasangan SR 1,560,000,000 650,000,000 910,000,000
Sub Total 29,822,500,000 9,100,000,000 9,897,500,000
URAIAN KEGIATAN PENGEMBANGAN ( 2014-2019 )
IPA
KA
MP
UN
G S
AT
U
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :Pembuatan Perencanaan Pengembangan Sumber Air Baku :a. Embung Binalatung 3 (FS, AMDAL, DED) 1,500,000,000 -b. Pembangunan Pekerjaan Fisik Embung Binalatung 3 95,000,000,000 -
II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED ) 500,000,000 - 500,000,000 2 Pemasangan Daya Listrik PLN > 1000 KVA 2,000,000,000 2,000,000,000 - 3 Pengadaan / Pemasangan Genset Kapasitas > 1000 KVA 3,500,000,000 3,500,000,000 4 Pengadaan / Pemasangan pompa, Panel Inverter lengkap dengan ME 3,000,000,000 - 1,500,000,000 5 Pengadaan / Pemasangan pompa Kimia Digital, Panel Inverter lengkap dengan ME 5,750,000,000 - 2,500,000,000 6 Pengadaan Peralatan Laboratarium 3,750,000,000 1,500,000,000 7 Pembangunan Gudang Bahan Kimia & Work Shop 6,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA KAMP. SATU ) :1 Pengembangan Jaringan Air Bersih 29,352,230,000 29,352,230,000 -2 Pengembangan Jaringan Air Minum Zona Kampung Satu 4,469,700,000 969,700,000 1,500,000,000 3 Spam MBR P.P Jaringan Perpipaan Optimalisasi (Mamburungan) 7,500,000,000 3,500,000,000 4 PENGEMBANGAN / PEMBANGUNAN BOSTER PUMP, RESERVOIR DAN PERPIPAAN LOKASI :
a. Kecamatan Tarakan Timur, Mamburungan 5,000,000,000 5,000,000,000 b. Kecamatan Tarakan Timur, Kampung Enam 4,500,000,000 -
5 Pengembangan Jaringan Air Minum Wilayah Lingkas Ujung & Gn. Lingkas 2,000,000,000 2,000,000,000 6 Pengembangan Jaringan Air Minum Wilayah Mamburungan TimurIV UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 5000 unit 15,405,000,000 6,500,000,000
Sub Total 189,226,930,000 32,321,930,000 28,000,000,000
IPA
KA
MP
UN
G B
UG
IS
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 1,500,000,000 - 500,000,000 a Daerah Aliran Sungai ( DAS ) - - -b Pembangunan Folder 15,000,000,000 15,000,000,000 II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 350,000,000 350,000,000 2 Uprating IPA 2,000,000,000 3 Pengadaan / Pemasangan Genset Kapasitas > 350 KVA 3,500,000,000 3,500,000,000 - 4 Pengadaan / Pemasangan pompa, Panel Inverter lengkap dengan ME 4,500,000,000 1,500,000,000 1,500,000,000 5 Pengadaan / Pemasangan pompa Kimia Digital, Panel Inverter lengkap dengan ME 7,500,000,000 1,500,000,000 1,500,000,000 6 Pengadaan Peralatan Laboratarium 3,750,000,000 1,500,000,000 1,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA KAMP. BUGIS ) :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 1,000,000,000 1,000,000,000 2 Pengembangan Jaringan Air Bersih 5,000,000,000 3 Reservoar Karang Balik & Perpipaan Tranmisi Air Bersih 7,500,000,000 4 Booster Pump & Reservoar Gunung Selumit 5,000,000,000 IV UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 825 unit 3,402,100,000 1,072,500,000 2 Review Master Plan - 750,000,000 3 Corporate Plan 2019-2024
Sub Total 60,002,100,000 8,000,000,000 22,672,500,000
IPA
PE
RSE
MA
IAN
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 1,500,000,000 - 500,000,000 II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 300,000,000 - 300,000,000 2 Pemasangan Daya Listrik PLN > 1000 KVA 6,000,000,000 6,000,000,000 - 3 Pengadaan / Pemasangan Genset Kapasitas > 1000 KVA 3,500,000,000 3,500,000,000 - 4 Pengadaan / Pemasangan pompa, Panel Inverter lengkap dengan ME 3,000,000,000 - 1,500,000,000 5 Pengadaan / Pemasangan pompa Kimia Digital, Panel Inverter lengkap dengan ME 5,750,000,000 - 2,500,000,000 6 Pengadaan Peralatan Laboratarium 3,750,000,000 1,500,000,000 1,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA KAMP. SATU ) :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 300,000,000 300,000,000 -2 Pengembangan Jaringan Air Minum Zone IPA Persemaian 970,000,000 970,000,000 3 Pengembangan Jaringan Perpipaan Jln. Aki Babu, Suaran Juata Lembah 2,500,000,000 2,500,000,000 6 PENGEMBANGAN / PEMBANGUNAN BOSTER PUMP, RESERVOIR DAN PERPIPAAN LOKASI :
c. Kecamatan Tarakan Tengah ( Jln Gn. Selumit / Gn. Daeng ) 5,000,000,000 5,000,000,000 - IV UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 3000 unit 8,450,000,000 3,900,000,000
Sub Total 41,020,000,000 19,770,000,000 9,700,000,000
IPA
JU
AT
A L
AU
T
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 3,000,000,000 - 2,400,000,000 a Embung Belalung 60,000,000,000 - -b Embung Maya 75,000,000,000 - -II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 300,000,000 300,000,000 - 2 Pengembangan IPA Juata Laut ( Eksisting ) 3,419,700,000 919,700,000 2,500,000,000 3 Pengembangan IPA Juata Laut ( embung Bengawan ) 25,000,000,000 4 Pengadaan / Pemasangan Genset Kapasitas > 350 KVA 3,500,000,000 5 Pengadaan / Pemasangan pompa, Panel Inverter lengkap dengan ME 1,500,000,000 750,000,000 6 Pengadaan / Pemasangan pompa Kimia Digital, Panel Inverter lengkap dengan ME 1,500,000,000 7 Pengadaan Peralatan Laboratarium 2,250,000,000 1,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA JUATA LAUT ) :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 300,000,000 300,000,000 -2 Pengembangan Jaringan Zona IPA Juata Laut 3,580,000,000 580,000,000 1,000,000,000 3 Pengembangan Jaringan Perpipaan Jalan Aji Iskandar 3,500,000,000 3,500,000,000 4 Pengembangan Jaringan Pelayanan Air Bersih Intraca Tahap 3 2,500,000,000 2,500,000,000 5 Pengembangan Jaringan Pelayanan Air Bersih Kawasan Perumahan PNS 3,100,000,000 3,100,000,000 6 Pengembangan Jaringan Perpipaan Jalan Sei Bengawan 3,000,000,000 3,000,000,000 IV UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 1500 unit 3,971,500,000 1,950,000,000
Sub Total 195,421,200,000 2,849,700,000 20,950,000,000
IPA
PA
NT
AI
AM
AL
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :1 Pembangunan Intake Sungai Hanjulung 1,500,000,000 - 1,500,000,000 2 FS, AMDAL & DED Embung Hanjulung 500,000,000 - 500,000,000 3 Konstruksi Embung Hanjulung 60,000,000,000 4 FS, AMDAL & DED Embung Manggatal 1,500,000,000 5 Konstruksi Embung Manggatal - 6 FS, AMDAL & DED Embung Batu Mapan 500,000,000 7 Konstruksi Embung Batu Mapan - 8 FS, AMDAL & DED Embung Betogog 500,000,000 9 Konstruksi Embung Batu Betogog -
II UNIT PENGOLAHAN DAN JARINGAN DISTRIBUSI ( ZONE PANTAI AMAL ) :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 300,000,000 300,000,000 - 2 Pemasangan Daya Listrik PLN > 197 KVA 1,750,000,000 - 1,750,000,000 3 Pengadaan / Pemasangan Genset Kapasitas > 200 KVA 2,250,000,000 - 2,250,000,000 4 Pembanguna Instalasi Pengolahan Dan Jaringan di- Kawasan Pantai Amal 92,650,000,000 - 92,650,000,000 III UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 2,402,400,000
-
Sub Total 163,852,400,000 300,000,000 98,650,000,000
IPA
RA
WA
SAR
I
PROJECT TASKS INVESTASI 2014-2019 2014 2015I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 500,000,000 500,000,000 -2 Pembangunan Folder air Baku 8,000,000,000 8,000,000,000
II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 800,000,000 800,000,000 - 2 Pembangunan IPA Kapasitas 60 l/detik 30,000,000,000 - 30,000,000,000 3 Pengadaan / Pemasangan Genset Kapasitas > 350 KVA 3,500,000,000 3,500,000,000 4 Pengadaan / Pemasangan pompa, Panel Inverter lengkap dengan ME 750,000,000 - 750,000,000 5 Pengadaan / Pemasangan pompa Kimia Digital, Panel Inverter lengkap dengan ME 1,500,000,000 1,500,000,000 6 Pengadaan Peralatan Laboratarium 1,000,000,000 1,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA 613 ) :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 1,000,000,000 500,000,000 500,000,000 2 Pengembangan Jaringan Zona IPA 613 1,000,000,000 - 1,000,000,000 3 Pengembangan Jaringan Perpipaan Juata Lembah 3,500,000,000 3,500,000,000 4 Pengembangan Jaringan Pelayanan Aki Balak 2,500,000,000 2,500,000,000 5 Pengembangan Jaringan Pelayanan Air Bersih Karang Anyar Pantai 3,100,000,000 3,100,000,000 6 Pengembangan Jaringan Perpipaan Karang Harapan 3,000,000,000 3,000,000,000 IV UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 1500 unit 3,971,500,000 1,950,000,000
Sub Total 64,121,500,000 1,800,000,000 60,300,000,000
IPA
BA
TU
MA
PA
N
PROJECT TASKS INVESTASI 2014-2019 2014 2015I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 500,000,000 500,000,000 -2 Pengembangan Intake Sungai Batu Mapan 3,000,000,000 3,000,000,000
II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 800,000,000 800,000,000 - 2 Pembangunan IPA Kapasitas 60 l/detik 30,000,000,000 - 30,000,000,000 3 Pengadaan / Pemasangan Genset Kapasitas > 350 KVA 3,500,000,000 3,500,000,000 4 Pengadaan / Pemasangan pompa, Panel Inverter lengkap dengan ME 750,000,000 - 750,000,000 5 Pengadaan / Pemasangan pompa Kimia Digital, Panel Inverter lengkap dengan ME 1,500,000,000 1,500,000,000 6 Pengadaan Peralatan Laboratarium 1,000,000,000 1,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA BATU MAPAN ) :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 1,000,000,000 500,000,000 500,000,000 2 Pengembangan Jaringan Pelayanan Binalatung 5,000,000,000 - 5,000,000,000 3 Pengembangan Jaringan Perpipaan Pesisir Pantai Amal 4,000,000,000 4,000,000,000 4 Pengembangan Jaringan Pelayanan Air Bersih Tanjung Batu 3,500,000,000 3,500,000,000 5 Pengembangan Jaringan Pelayanan Air Bersih Kampung Angin-angin 6,000,000,000 6,000,000,000 6 Pengembangan Jaringan Perpipaan Tanjung Pasir 6,000,000,000 6,000,000,000 IV UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 1500 unit 3,971,500,000 1,950,000,000
Sub Total 70,521,500,000 1,800,000,000 66,700,000,000
2016 2017 2018 2019
600,000,000 637,500,000 675,000,000 712,500,000
12,380,000,000 2,952,750,000 3,391,462,500 3,909,905,625
2,750,000,000 16,637,500,000 3,625,000,000 1,062,500,000
2,025,000,000 3,062,500,000 3,100,000,000 2,637,500,000
17,755,000,000 23,290,250,000 10,791,462,500 8,322,405,625
2016 2017 2018 2019
71,700,000,000 30,355,000,000 28,750,000,000 2,600,000,000
10,550,000,000 15,150,000,000 3,054,600,000 1,825,000,000
6,450,000,000 3,475,000,000 975,000,000 650,000,000
93,066,500,000 2,450,000,000 325,000,000 75,780,000,000
500,000,000 61,300,000,000 1,130,000,000 1,972,400,000
266,500,000 650,000,000 325,000,000 780,000,000
266,500,000 650,000,000 325,000,000 780,000,000
182,799,500,000 114,030,000,000 34,884,600,000 84,387,400,000
2016 2017 2018 2019
- - - - 150,000,000 150,000,000 150,000,000 150,000,000
- - - -- - - -
- - - -
- - - -
- - - -- - - -- - - -- - - -- - - -- - - -- - - -- - - -- - - -
biaya dinas
450,000,000 487,500,000 525,000,000 562,500,000 - - - -
###
600,000,000 637,500,000 675,000,000 712,500,000
2016 2017 2018 2019
- - - - - - -
- - - - - - - - - - - -
2,000,000,000 2,000,000,000 - - - 2,000,000,000 -
- - - -- - - -
###- - - -- - - -
2,500,000,000 - - -- - - -
biaya dinas
1,815,000,000 1,996,500,000 2,196,150,000 2,415,765,000 1,300,000,000 - - -
- - - -- - - -- - - -- - - -- - - -
765,000,000 956,250,000 1,195,312,500 1,494,140,625 ###
12,380,000,000 2,952,750,000 3,391,462,500 3,909,905,625
2016 2017 2018 2019
###- - - -
500,000,000 500,000,000 500,000,000 500,000,000 500,000,000 15,000,000,000
- - - -- - - -- - - -- - - -- - - -- - - -- - - -- - - -
- - - -- - - -- - - -- - - -- - - -- - - -- - - -
biaya dinas
450,000,000 487,500,000 525,000,000 562,500,000 1,300,000,000 650,000,000 2,600,000,000
###
2,750,000,000 16,637,500,000 3,625,000,000 1,062,500,000
2016 2017 2018 2019
- - - - 75,000,000 75,000,000 75,000,000 75,000,000
- - - -- - - -
1,000,000,000 1,000,000,000 1,000,000,000 1,000,000,000
- - - -- - - -
500,000,000 500,000,000 500,000,000 - 1,000,000,000 1,000,000,000 1,000,000,000
biaya dinas
450,000,000 487,500,000 525,000,000 562,500,000 - - - -
###
2,025,000,000 3,062,500,000 3,100,000,000 2,637,500,000
2016 2017 2018 2019
- - - - 45,000,000,000 25,000,000,000 25,000,000,000 -
- - - - - - - - - - - - 1,500,000,000 - - - 1,750,000,000 1,500,000,000 - - 1,000,000,000 750,000,000 500,000,000 - 6,000,000,000
- - - - 2,000,000,000 - - - 2,000,000,000 2,000,000,000 - -
- - - 4,500,000,000 - - -
- - - - 6,000,000,000
biaya dinas
1,950,000,000 1,105,000,000 3,250,000,000 2,600,000,000 ###
71,700,000,000 30,355,000,000 28,750,000,000 2,600,000,000
###
2016 2017 2018 2019
### 500,000,000 500,000,000 - -
- - - -- - - -
- - - - 2,000,000,000
- - - - 1,500,000,000 - - - 1,500,000,000 1,500,000,000 1,500,000,000 - 750,000,000 500,000,000 - -
- - - - 2,500,000,000 1,500,000,000 1,000,000,000 7,500,000,000
5,000,000,000 biaya dinas
1,300,000,000 650,000,000 54,600,000 325,000,000 ###
500,000,000
10,550,000,000 15,150,000,000 3,054,600,000 1,825,000,000
2016 2017 2018 2019
500,000,000 500,000,000 - -
- - - - - - - - - - - - 1,500,000,000 - - - 1,750,000,000 1,500,000,000 - - 750,000,000 500,000,000 - -
- - - -
- - - - biaya dinas
1,950,000,000 975,000,000 975,000,000 650,000,000 ###
6,450,000,000 3,475,000,000 975,000,000 650,000,000
2016 2017 2018 2019
300,000,000 300,000,000 - - 60,000,000,000 - - -
- - - 75,000,000,000
- - - -
25,000,000,000 3,500,000,000 - - - 750,000,000 - - - 1,500,000,000 - 750,000,000 500,000,000 - -
- - - - 1,000,000,000 1,000,000,000
biaya dinas
266,500,000 650,000,000 325,000,000 780,000,000 ###
93,066,500,000 2,450,000,000 325,000,000 75,780,000,000
2016 2017 2018 2019
- - - - - - - -
60,000,000,000 - - 500,000,000 1,000,000,000 -
500,000,000
500,000,000
- - - - - - - - - - - -
- - - biaya dinas
1,300,000,000 130,000,000 972,400,000 ###
500,000,000 61,300,000,000 1,130,000,000 1,972,400,000
2016 2017 2018 2019
- - - -
- - - -
- - - - - - - - - - - - - -
- - - - - -
- - - -
266,500,000 650,000,000 325,000,000 780,000,000
266,500,000 650,000,000 325,000,000 780,000,000
2016 2017 2018 2019
- - - -
- - - -
- - - - - - - - - - - - - -
- - - - - -
- - - -
266,500,000 650,000,000 325,000,000 780,000,000
266,500,000 650,000,000 325,000,000 780,000,000
KEGIATAN OPTIMALISASI ( 2014-2019 )
KEG
IATA
N O
PTIM
ALIS
ASI PROJECT TASKS INVESTASI 2014-2019 2014 2015
Instalasi Penolahan Air ( IPA ) Kampung Satu 79,942,500,000 50,155,000,000 27,162,500,000
Instalasi Pengolahan Air ( IPA ) Kampung Bugis 99,771,118,125 11,900,000,000 65,237,000,000
Instalasi Pengolahan Air ( IPA ) Persemaian 59,862,500,000 23,775,000,000 12,012,500,000
Instalasi Pengolahan Air ( IPA ) Juata Laut 29,822,500,000 9,100,000,000 9,897,500,000
Grand Total 269,398,618,125 94,930,000,000 114,309,500,000
KEGIATAN PENGEMBANGAN ( 2014-2019 )
KEG
IATA
N P
ENG
EMBA
NG
AN
PROJECT TASKS INVESTASI 2014-2019 2014 2015
Instalasi Kampung Satu 193,726,930,000 32,321,930,000 28,000,000,000
Instalasi Kampung Bugis 61,252,100,000 8,000,000,000 22,672,500,000
Instalasi Persemaian 41,020,000,000 19,770,000,000 9,700,000,000
Instalasi Juata Laut 195,421,200,000 2,849,700,000 20,950,000,000
Instalasi Pantai Amal 163,852,400,000 300,000,000 98,650,000,000
Instalasi Rawasari 64,121,500,000 1,800,000,000 60,300,000,000
Instalasi Batu Mapan 70,521,500,000 1,800,000,000 66,700,000,000
Grand Total 789,915,630,000 66,841,630,000 306,972,500,000
URAIAN KEGIATAN OPTIMALISASI ( 2014-2019 )
IPA
KA
MP
UN
G S
AT
U
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) :1 Perbaikan Pintu Air 2,500,000,000 2,500,000,000 -2 Normalisasi Das Aliran Sungai ( DAS ) 900,000,000 150,000,000 150,000,000 3 Pembuatan Ponton Intake Embung Binalatung & Jaringan Transmisi Air Baku 2,000,000,000 2,000,000,000 4 Pengadaan & Pemasangan Pompa Submersible kap.250 l/det H=40m 1,000,000,000 1,000,000,000 II UNIT PENGOLAHAN :1 Rencana Pekerjaan Bongkar/Pasang Instalasi Pengolahan Air (IPA) 30 l/det dan 60 l/det 2,000,000,000 2,000,000,000 -2 Pembuatan Sarana Olah Raga bagi Masyarakat sekitar 750,000,000 750,000,000 3 Sistem Scada Pengolahan Air 90 lt/det 4,000,000,000 4,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA KAMP. SATU ) :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED ) 500,000,000 500,000,000 -2 Rehabilitasi Pipa Jaringan ( Kelurahan Kp. Empat - Kamp. Enam ) 30,000,000,000 30,000,000,000 -3 Rehabilitasi Pipa Jaringan Kelurahan Lingkas Ujung 3,000,000,000 3,000,000,000 -4 Rehabilitasi Pipa Jaringan Kelurahan Gn Lingkas - Kelurahan Sebengkok 5,000,000,000 2,500,000,000 2,500,000,000 5 Rehabilitasi Pipa Jaringan Kelurahan Pamusian 3,000,000,000 1,500,000,000 1,500,000,000 6 SPAM MBR P/P Jaringan Perpipaan Optimalisasi ( Mamburungan ) 5,000,000,000 3,500,000,000 1,500,000,000 7 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME ( Boster PUMP ) 1,500,000,000 - 1,500,000,000 8 Boster Pump Gunung Lingkas & Reservoar 250 m3 5,000,000,000 5,000,000,000 9 Boster Pump Kamp.Empat & Reservoar 250 m3 5,000,000,000 5,000,000,000 IV UNIT SAMBUNGAN RUMAH :1 Rehabilitasi Sambungan Pipa Dinas dan Meter Air 2,812,500,000 375,000,000 412,500,000 2 Pengadaan & Pemasangan SR 5,980,000,000 3,380,000,000 2,600,000,000
Sub Total 79,942,500,000 50,155,000,000 27,162,500,000
IPA
KA
MP
UN
G B
UG
IS
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) :1 Perbaikan Pintu Air 2,500,000,000 2,500,000,000 2 Normalisasi Das Aliran Sungai ( DAS ) 1,500,000,000 - 1,500,000,000 3 Pembangunan Folder 15,000,000,000 15,000,000,000 II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 1,500,000,000 1,500,000,000 - 2 Rehabilitasi / Penambahan Daya Listrik PLN ( 197 KVA + 78 KVA ) > Total +/- = 350 KVA 1,500,000,000 1,500,000,000 3 Rehabilitasi / Pembangunan Ruang gardu duduk/Panel Indux ( Trapo 350 KVA, cubical, Incoming out Going ) 3,500,000,000 3,500,000,000 4 Rehabilitasi Meter Indux ( Digital ) Air Baku, Pencuciaan ( Filter ) & Distribusi 4,000,000,000 2,000,000,000 5 Rehabilitasi sistim Pencucian Filter ( Gate Valve ), Tube setler dan Ruang Thomson 5,000,000,000 3,000,000,000 6 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME 5,000,000,000 3,000,000,000 7 Sistem Scada Pengolahan Air 60 lt/det 650,000,000 650,000,000 8 Pengadaan & Pemasangan Pompa kap.60 lt/det H=70 m 2,500,000,000 2,500,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA KAMP.BUGIS ) :1 Rehabilitasi Pipa Jaringan Jln Jend Sudirman ( Perempatan THM s/d Gedung Gitajalatama ) 4,000,000,000 4,000,000,000 -2 Rehabilitasi Pipa Jaringan Kelurahan Kr. Anyar - Kelurahan Sebengkok 7,000,000,000 7,000,000,000 3 Rehabilitasi/Optimalisasi sistim NRW ( Penekanan Tingkat Kebocoran ) Distrik Metrik Area 6,000,000,000 3,500,000,000 4 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME ( Boster PUMP ) 4,000,000,000 - 4,000,000,000 5 Rehabilitasi sistim Perpipaan Jalur Yos Sudarso 1,000,000,000 1,000,000,000 6 Rehabilitas Reservoar 500 m3 & Perpipaan (gravitasi Karang Anyar s/d Sebengkok) 1,500,000,000 1,500,000,000 7 Pemutahiran Program GIS 1,500,000,000 1,500,000,000 IV UNIT SAMBUNGAN RUMAH :1 Rehabilitasi Sambungan Pipa Dinas dan Meter Air 11,573,415,000 1,500,000,000 1,650,000,000 2 Pengadaan & Pemasangan SR 3,900,000,000 1,300,000,000 1,300,000,000 V UNIT SARANA PRASARANA KANTOR & PELAYANAN :1 Gedung Kantor 7,500,000,000 7,500,000,000 2 Perluasan Kantor Pelayanan 500,000,000 500,000,000 3 Rehabilitasi Kantor Pelayanan 450,000,000 450,000,000 4 Perbaikan Jalan lingkungan 250,000,000 250,000,000 5 Kendaraan Operasional (Roda empat & dua) 2,175,000,000 2,100,000,000 75,000,000 6 pemutahiran Program Reading & Billing 5,772,703,125 750,000,000 612,000,000
Sub Total 99,771,118,125 11,900,000,000 65,237,000,000
IPA
PE
RS
EM
AIA
N
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) : 4861 Perbaikan Pintu Air 1,000,000,000 1,000,000,000 2 Normalisasi Das Aliran Sungai ( DAS ) 2,500,000,000 500,000,000 3 Pembangunan Folder S Persemaian (DED & Konstruksi) 15,500,000,000 II UNIT PENGOLAHAN :1 Rehabilitasi / Penambahan Daya Listrik PLN (2 x 197 KVA, Embung 66 KVA ) + 92 KVA > Total +/- = 60 1,000,000,000 1,000,000,000 -2 Rehabilitasi / Pembangunan Ruang gardu duduk/Panel Indux ( Trapo 1250 KVA, Kubical, Incoming out Going 2,000,000,000 2,000,000,000 -3 Rehabilitasi Meter Indux ( Digital ) Air Baku, Pencuciaan ( Filter ) & Distribusi 2,000,000,000 1,500,000,000 2,000,000,000 4 Rehabilitasi sistim Pencucian Filter ( Gate Valve ), Tube setler 3,000,000,000 3,000,000,000 -5 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME 3,000,000,000 3,000,000,000 -6 Perbaikan Reservoir 500 m3 1,500,000,000 1,500,000,000 -7 Interkoneksi Jaringan Distribusi /Pompa 1,000,000,000 1,000,000,000 8 Rehab Jaringan Distribusi Akibalak- Lestari 500,000,000 500,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA PERSEMAIAN ) WILAYAH JALUR YOS.S & L.UJUNG :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 300,000,000 300,000,000 -2 3,400,000,000 3,400,000,000 -3 2,000,000,000 2,000,000,000 -4 1,400,000,000 1,400,000,000 -5 SPAM MBR P/P Jaringan Perpipaan Optimalisasi Kota Tarakan 3,000,000,000 3,000,000,000 -6 Rehabilitasi/Optimalisasi sistim NRW ( Penekanan Tingkat Kebocoran ) Distrik Metrik Area 3,000,000,000 3,000,000,000 7 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME ( Boster PUMP ) 2,500,000,000 - 2,500,000,000 8 Interkoneksi Jaringan Distribusi Reservoar Peningki-Jl.Cendawasih 450,000,000 450,000,000 IV UNIT SAMBUNGAN RUMAH :1 Rehabilitasi Sambungan Pipa Dinas dan Meter Air 2,812,500,000 375,000,000 412,500,000 2 Pengadaan & Pemasangan SR 6,500,000,000 1,300,000,000 650,000,000
Sub Total 58,362,500,000 23,775,000,000 12,012,500,000
SPAM Khusus KEK ( P/P Pipa HDPE Ø 150 mm - Ø 75 mm, Panjang = 8.200 m' )SPAM MBR P/P Pipa HDPE Ø 150 mm-Ø 75 mm ( IKK Persemaian, Kr.Harapan,Kec.Tarakan Barat )SPAM Khusus PPI Tengkayu II ( P/P Pipa HDPE Ø 150 mm - Ø 75 mm, Panjang = 2.815 m' )
IPA
JU
AT
A L
AU
T
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) :1 Perbaikan Pintu Air & Pemasangan turap siring 1,000,000,000 1,000,000,000 -2 Normalisasi Das Aliran Sungai ( DAS ) 450,000,000 75,000,000 75,000,000 II UNIT PENGOLAHAN :1 Rehabilitasi / Penambahan Daya Listrik PLN (82.500 KVA + 67,500 KVA > Total +/- = 150 KVA 1,000,000,000 1,000,000,000 -2 Rehabilitasi / Pembangunan Ruang gardu duduk/Panel Indux ( Trapo 200 KVA, Kubical, Incoming out Going ) 1,500,000,000 1,500,000,000 -1 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME 6,500,000,000 1,500,000,000 1,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA JUATA LAUT ) WILAYAH PERUM PNS, KORPRI & INTRACA : 1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 1,000,000,000 1,000,000,000 2 Rehabilitasi Jaringan Pipa Transmisi / Distribusi Air Bersih 4,000,000,000 4,000,000,000 3 Rehabilitasi Jaringan Pipa Distribusi Air Bersih 3,000,000,000 2,000,000,000 1,000,000,000 4 Rehabilitasi/Optimalisasi sistim NRW ( Penekanan Tingkat Kebocoran ) Distrik Metrik Area 2,000,000,000 500,000,000 5 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME ( Boster PUMP ) 3,000,000,000 - - 6 Laboratorium & Gudang, Jalan Lingkungan, dll 2,000,000,000 1,000,000,000 1,000,000,000 IV UNIT SAMBUNGAN RUMAH :1 Rehabilitasi Sambungan Pipa Dinas dan Meter Air 2,812,500,000 375,000,000 412,500,000 2 Pengadaan & Pemasangan SR 1,560,000,000 650,000,000 910,000,000
Sub Total 29,822,500,000 9,100,000,000 9,897,500,000
URAIAN KEGIATAN PENGEMBANGAN ( 2014-2019 )
IPA
KA
MP
UN
G S
AT
U
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :Pembuatan Perencanaan Pengembangan Sumber Air Baku :a. Embung Binalatung 3 (FS, AMDAL, DED) 1,500,000,000 -b. Pembangunan Pekerjaan Fisik Embung Binalatung 3 95,000,000,000 -
II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED ) 500,000,000 - 500,000,000 2 Pemasangan Daya Listrik PLN > 1000 KVA 2,000,000,000 2,000,000,000 - 3 Pengadaan / Pemasangan Genset Kapasitas > 1000 KVA 3,500,000,000 3,500,000,000 4 Pengadaan / Pemasangan pompa, Panel Inverter lengkap dengan ME 3,000,000,000 - 1,500,000,000 5 Pengadaan / Pemasangan pompa Kimia Digital, Panel Inverter lengkap dengan ME 5,750,000,000 - 2,500,000,000 6 Pengadaan Peralatan Laboratarium 3,750,000,000 1,500,000,000 7 Pembangunan Gudang Bahan Kimia & Work Shop 6,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA KAMP. SATU ) :1 Pengembangan Jaringan Air Bersih 29,352,230,000 29,352,230,000 -2 Pengembangan Jaringan Air Minum Zona Kampung Satu 4,469,700,000 969,700,000 1,500,000,000 3 Spam MBR P.P Jaringan Perpipaan Optimalisasi (Mamburungan) 7,500,000,000 3,500,000,000 4 PENGEMBANGAN / PEMBANGUNAN BOSTER PUMP, RESERVOIR DAN PERPIPAAN LOKASI :
a. Kecamatan Tarakan Timur, Mamburungan 5,000,000,000 5,000,000,000 b. Kecamatan Tarakan Timur, Kampung Enam 4,500,000,000 -
5 Pengembangan Jaringan Air Minum Wilayah Lingkas Ujung & Gn. Lingkas 2,000,000,000 2,000,000,000 6 Pengembangan Jaringan Air Minum Wilayah Mamburungan TimurIV UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 5000 unit 15,405,000,000 6,500,000,000
Sub Total 189,226,930,000 32,321,930,000 28,000,000,000
IPA
KA
MP
UN
G B
UG
IS
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 1,500,000,000 - 500,000,000 a Daerah Aliran Sungai ( DAS ) - - -b Pembangunan Folder 15,000,000,000 15,000,000,000 II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 350,000,000 350,000,000 2 Uprating IPA 2,000,000,000 3 Pengadaan / Pemasangan Genset Kapasitas > 350 KVA 3,500,000,000 3,500,000,000 - 4 Pengadaan / Pemasangan pompa, Panel Inverter lengkap dengan ME 4,500,000,000 1,500,000,000 1,500,000,000 5 Pengadaan / Pemasangan pompa Kimia Digital, Panel Inverter lengkap dengan ME 7,500,000,000 1,500,000,000 1,500,000,000 6 Pengadaan Peralatan Laboratarium 3,750,000,000 1,500,000,000 1,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA KAMP. BUGIS ) :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 1,000,000,000 1,000,000,000 2 Pengembangan Jaringan Air Bersih 5,000,000,000 3 Reservoar Karang Balik & Perpipaan Tranmisi Air Bersih 7,500,000,000 4 Booster Pump & Reservoar Gunung Selumit 5,000,000,000 IV UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 825 unit 3,402,100,000 1,072,500,000 2 Review Master Plan - 750,000,000 3 Corporate Plan 2019-2024
Sub Total 60,002,100,000 8,000,000,000 22,672,500,000
IPA
PE
RS
EM
AIA
N
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 1,500,000,000 - 500,000,000 II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 300,000,000 - 300,000,000 2 Pemasangan Daya Listrik PLN > 1000 KVA 6,000,000,000 6,000,000,000 - 3 Pengadaan / Pemasangan Genset Kapasitas > 1000 KVA 3,500,000,000 3,500,000,000 - 4 Pengadaan / Pemasangan pompa, Panel Inverter lengkap dengan ME 3,000,000,000 - 1,500,000,000 5 Pengadaan / Pemasangan pompa Kimia Digital, Panel Inverter lengkap dengan ME 5,750,000,000 - 2,500,000,000 6 Pengadaan Peralatan Laboratarium 3,750,000,000 1,500,000,000 1,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA KAMP. SATU ) :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 300,000,000 300,000,000 -2 Pengembangan Jaringan Air Minum Zone IPA Persemaian 970,000,000 970,000,000 3 Pengembangan Jaringan Perpipaan Jln. Aki Babu, Suaran Juata Lembah 2,500,000,000 2,500,000,000 6 PENGEMBANGAN / PEMBANGUNAN BOSTER PUMP, RESERVOIR DAN PERPIPAAN LOKASI :
c. Kecamatan Tarakan Tengah ( Jln Gn. Selumit / Gn. Daeng ) 5,000,000,000 5,000,000,000 - IV UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 3000 unit 8,450,000,000 3,900,000,000
Sub Total 41,020,000,000 19,770,000,000 9,700,000,000
IPA
JU
AT
A L
AU
T
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 3,000,000,000 - 2,400,000,000 a Embung Belalung 60,000,000,000 - -b Embung Maya 75,000,000,000 - -II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 300,000,000 300,000,000 - 2 Pengembangan IPA Juata Laut ( Eksisting ) 3,419,700,000 919,700,000 2,500,000,000 3 Pengembangan IPA Juata Laut ( embung Bengawan ) 25,000,000,000 4 Pengadaan / Pemasangan Genset Kapasitas > 350 KVA 3,500,000,000 5 Pengadaan / Pemasangan pompa, Panel Inverter lengkap dengan ME 1,500,000,000 750,000,000 6 Pengadaan / Pemasangan pompa Kimia Digital, Panel Inverter lengkap dengan ME 1,500,000,000 7 Pengadaan Peralatan Laboratarium 2,250,000,000 1,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA JUATA LAUT ) :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 300,000,000 300,000,000 -2 Pengembangan Jaringan Zona IPA Juata Laut 3,580,000,000 580,000,000 1,000,000,000 3 Pengembangan Jaringan Perpipaan Jalan Aji Iskandar 3,500,000,000 3,500,000,000 4 Pengembangan Jaringan Pelayanan Air Bersih Intraca Tahap 3 2,500,000,000 2,500,000,000 5 Pengembangan Jaringan Pelayanan Air Bersih Kawasan Perumahan PNS 3,100,000,000 3,100,000,000 6 Pengembangan Jaringan Perpipaan Jalan Sei Bengawan 3,000,000,000 3,000,000,000 IV UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 1500 unit 3,971,500,000 1,950,000,000
Sub Total 195,421,200,000 2,849,700,000 20,950,000,000
IPA
PA
NT
AI
AM
AL
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :1 Pembangunan Intake Sungai Hanjulung 1,500,000,000 - 1,500,000,000 2 FS, AMDAL & DED Embung Hanjulung 500,000,000 - 500,000,000 3 Konstruksi Embung Hanjulung 60,000,000,000 4 FS, AMDAL & DED Embung Manggatal 1,500,000,000 5 Konstruksi Embung Manggatal - 6 FS, AMDAL & DED Embung Batu Mapan 500,000,000 7 Konstruksi Embung Batu Mapan - 8 FS, AMDAL & DED Embung Betogog 500,000,000 9 Konstruksi Embung Batu Betogog -
II UNIT PENGOLAHAN DAN JARINGAN DISTRIBUSI ( ZONE PANTAI AMAL ) :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 300,000,000 300,000,000 - 2 Pemasangan Daya Listrik PLN > 197 KVA 1,750,000,000 - 1,750,000,000 3 Pengadaan / Pemasangan Genset Kapasitas > 200 KVA 2,250,000,000 - 2,250,000,000 4 Pembanguna Instalasi Pengolahan Dan Jaringan di- Kawasan Pantai Amal 92,650,000,000 - 92,650,000,000 III UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 2,402,400,000
-
Sub Total 163,852,400,000 300,000,000 98,650,000,000
IPA
RA
WA
SA
RI
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 500,000,000 500,000,000 -2 Pembangunan Folder air Baku 8,000,000,000 8,000,000,000
II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 800,000,000 800,000,000 - 2 Pembangunan IPA Kapasitas 60 l/detik 30,000,000,000 - 30,000,000,000 3 Pengadaan / Pemasangan Genset Kapasitas > 350 KVA 3,500,000,000 3,500,000,000 4 Pengadaan / Pemasangan pompa, Panel Inverter lengkap dengan ME 750,000,000 - 750,000,000 5 Pengadaan / Pemasangan pompa Kimia Digital, Panel Inverter lengkap dengan ME 1,500,000,000 1,500,000,000 6 Pengadaan Peralatan Laboratarium 1,000,000,000 1,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA 613 ) :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 1,000,000,000 500,000,000 500,000,000 2 Pengembangan Jaringan Zona IPA 613 1,000,000,000 - 1,000,000,000 3 Pengembangan Jaringan Perpipaan Juata Lembah 3,500,000,000 3,500,000,000 4 Pengembangan Jaringan Pelayanan Aki Balak 2,500,000,000 2,500,000,000 5 Pengembangan Jaringan Pelayanan Air Bersih Karang Anyar Pantai 3,100,000,000 3,100,000,000 6 Pengembangan Jaringan Perpipaan Karang Harapan 3,000,000,000 3,000,000,000 IV UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 1500 unit 3,971,500,000 1,950,000,000
Sub Total 64,121,500,000 1,800,000,000 60,300,000,000
IPA
BA
TU
MA
PA
N
PROJECT TASKS INVESTASI 2014-2019 2014 2015
I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 500,000,000 500,000,000 -2 Pengembangan Intake Sungai Batu Mapan 3,000,000,000 3,000,000,000
II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 800,000,000 800,000,000 - 2 Pembangunan IPA Kapasitas 60 l/detik 30,000,000,000 - 30,000,000,000 3 Pengadaan / Pemasangan Genset Kapasitas > 350 KVA 3,500,000,000 3,500,000,000 4 Pengadaan / Pemasangan pompa, Panel Inverter lengkap dengan ME 750,000,000 - 750,000,000 5 Pengadaan / Pemasangan pompa Kimia Digital, Panel Inverter lengkap dengan ME 1,500,000,000 1,500,000,000 6 Pengadaan Peralatan Laboratarium 1,000,000,000 1,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA BATU MAPAN ) :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 1,000,000,000 500,000,000 500,000,000 2 Pengembangan Jaringan Pelayanan Binalatung 5,000,000,000 - 5,000,000,000 3 Pengembangan Jaringan Perpipaan Pesisir Pantai Amal 4,000,000,000 4,000,000,000 4 Pengembangan Jaringan Pelayanan Air Bersih Tanjung Batu 3,500,000,000 3,500,000,000 5 Pengembangan Jaringan Pelayanan Air Bersih Kampung Angin-angin 6,000,000,000 6,000,000,000 6 Pengembangan Jaringan Perpipaan Tanjung Pasir 6,000,000,000 6,000,000,000 IV UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 1500 unit 3,971,500,000 1,950,000,000
Sub Total 70,521,500,000 1,800,000,000 66,700,000,000
2016 2017 2018 2019
600,000,000 637,500,000 675,000,000 712,500,000
12,380,000,000 2,952,750,000 3,391,462,500 3,909,905,625
2,750,000,000 16,637,500,000 3,625,000,000 1,062,500,000
2,025,000,000 3,062,500,000 3,100,000,000 2,637,500,000
17,755,000,000 23,290,250,000 10,791,462,500 8,322,405,625
2016 2017 2018 2019
71,700,000,000 30,355,000,000 28,750,000,000 2,600,000,000
10,550,000,000 15,150,000,000 3,054,600,000 1,825,000,000
6,450,000,000 3,475,000,000 975,000,000 650,000,000
93,066,500,000 2,450,000,000 325,000,000 75,780,000,000
500,000,000 61,300,000,000 1,130,000,000 1,972,400,000
266,500,000 650,000,000 325,000,000 780,000,000
266,500,000 650,000,000 325,000,000 780,000,000
182,799,500,000 114,030,000,000 34,884,600,000 84,387,400,000
2016 2017 2018 2019KETERANGAN DOKUMEN PERENCANAAN
SUDAH ADA TIDAK ADA
- - - - √ 150,000,000 150,000,000 150,000,000 150,000,000 √
- - - - √- - - - √
- - - - √√
- - - - √
- - - - √- - - - √- - - - √- - - - √- - - - √- - - - √- - - - √- - - - √- - - - √
450,000,000 487,500,000 525,000,000 562,500,000 √- - - - √
600,000,000 637,500,000 675,000,000 712,500,000
2016 2017 2018 2019KETERANGAN DOKUMEN PERENCANAAN
SUDAH ADA TIDAK ADA
- - - - √ - - - √
√
- - - - √ - - - - √ - - - - √
2,000,000,000 √ 2,000,000,000 - - - √ 2,000,000,000 - √
- - - - √- - - - √
- - - - √- - - - √
2,500,000,000 - - - √- - - - √
√√√
1,815,000,000 1,996,500,000 2,196,150,000 2,415,765,000 √ 1,300,000,000 - - - √
- - - - √- - - - √- - - - √- - - - √- - - - √
765,000,000 956,250,000 1,195,312,500 1,494,140,625 √
12,380,000,000 2,952,750,000 3,391,462,500 3,909,905,625
2016 2017 2018 2019KETERANGAN DOKUMEN PERENCANAAN
SUDAH ADA TIDAK ADA
- - - - √ 500,000,000 500,000,000 500,000,000 500,000,000 √ 500,000,000 15,000,000,000 √
- - - - √- - - - √- - - - √- - - - √- - - - √- - - - √- - - - √- - - - √
- - - - √- - - - √- - - - √- - - - √- - - - √- - - - √- - - - √
√
450,000,000 487,500,000 525,000,000 562,500,000 √ 1,300,000,000 650,000,000 2,600,000,000 √
2,750,000,000 16,637,500,000 3,625,000,000 1,062,500,000
2016 2017 2018 2019KETERANGAN DOKUMEN PERENCANAAN
SUDAH ADA TIDAK ADA
- - - - √ 75,000,000 75,000,000 75,000,000 75,000,000 √
- - - - √- - - - √
1,000,000,000 1,000,000,000 1,000,000,000 1,000,000,000 √
- - - - √- - - - √
√ 500,000,000 500,000,000 500,000,000 √
- 1,000,000,000 1,000,000,000 1,000,000,000 √√
450,000,000 487,500,000 525,000,000 562,500,000 √- - - - √
2,025,000,000 3,062,500,000 3,100,000,000 2,637,500,000
2016 2017 2018 2019KETERANGAN DOKUMEN PERENCANAAN
SUDAH ADA TIDAK ADA
- - - - √ 45,000,000,000 25,000,000,000 25,000,000,000 - √
- - - - √ - - - - √ - - - - √ 1,500,000,000 - - - √ 1,750,000,000 1,500,000,000 - - √ 1,000,000,000 750,000,000 500,000,000 - √ 6,000,000,000 √
- - - - √ 2,000,000,000 - - - √ 2,000,000,000 2,000,000,000 - - √
- - - √ 4,500,000,000 - - - √
- - - - √ 6,000,000,000
1,950,000,000 1,105,000,000 3,250,000,000 2,600,000,000 √
71,700,000,000 30,355,000,000 28,750,000,000 2,600,000,000
2016 2017 2018 2019KETERANGAN DOKUMEN PERENCANAAN
SUDAH ADA TIDAK ADA
500,000,000 500,000,000 - - √- - - -- - - - √
- - - - √ 2,000,000,000 √
- - - - √ 1,500,000,000 - - - √ 1,500,000,000 1,500,000,000 1,500,000,000 - √ 750,000,000 500,000,000 - - √
- - - - √ √ 2,500,000,000 1,500,000,000 1,000,000,000 √ √ 7,500,000,000 √
5,000,000,000 √
1,300,000,000 650,000,000 54,600,000 325,000,000 √√
500,000,000 √
10,550,000,000 15,150,000,000 3,054,600,000 1,825,000,000
2016 2017 2018 2019KETERANGAN DOKUMEN PERENCANAAN
SUDAH ADA TIDAK ADA
500,000,000 500,000,000 - - √
- - - - √ - - - - √ - - - - √ 1,500,000,000 - - - √ 1,750,000,000 1,500,000,000 - - √ 750,000,000 500,000,000 - - √
- - - - √√√
- - - - √
1,950,000,000 975,000,000 975,000,000 650,000,000 √
6,450,000,000 3,475,000,000 975,000,000 650,000,000
2016 2017 2018 2019KETERANGAN DOKUMEN PERENCANAAN
SUDAH ADA TIDAK ADA
300,000,000 300,000,000 - - √ 60,000,000,000 - - - √
- - - 75,000,000,000 √
- - - - √√
25,000,000,000 √ 3,500,000,000 - - - √ 750,000,000 - - - √ 1,500,000,000 - √ 750,000,000 500,000,000 - - √
- - - - √ 1,000,000,000 1,000,000,000 √
√√√
√
266,500,000 650,000,000 325,000,000 780,000,000 √
93,066,500,000 2,450,000,000 325,000,000 75,780,000,000
2016 2017 2018 2019KETERANGAN DOKUMEN PERENCANAAN
SUDAH ADA TIDAK ADA
- - - - √ - - - - √
60,000,000,000 - - √ 500,000,000 1,000,000,000 - √
√ 500,000,000 √
√ 500,000,000 √
√
- - - - √ - - - - √ - - - - √
- - - √
1,300,000,000 130,000,000 972,400,000 √
500,000,000 61,300,000,000 1,130,000,000 1,972,400,000
2016 2017 2018 2019KETERANGAN DOKUMEN PERENCANAAN
SUDAH ADA TIDAK ADA
- - - - √√
- - - - √√
- - - - √ - - - - √ - - √ - - - - √
- - - - √ - - √
- √ - √ - √ - √
266,500,000 650,000,000 325,000,000 780,000,000 √
266,500,000 650,000,000 325,000,000 780,000,000
2016 2017 2018 2019KETERANGAN DOKUMEN PERENCANAAN
SUDAH ADA TIDAK ADA
- - - - √√
- - - - √√
- - - - √ - - - - √ - - √ - - - - √
- - - - √ - - √
- √ - √ - √ - √
266,500,000 650,000,000 325,000,000 780,000,000 √
266,500,000 650,000,000 325,000,000 780,000,000
KEGIATAN MULTYEARS OPTIMALISASI ( 2015-2017 )
KEG
IATA
N O
PTIM
ALIS
ASI PROJECT TASKS NILAI 2015
Instalasi Pengolahan Air ( IPA ) Kampung Bugis 40,300,000,000 40,300,000,000
Pajak Pertambahan Nilai / PPN 10 % 4,030,000,000 4,030,000,000
Grand Total 44,330,000,000 44,330,000,000
KEGIATAN MULTYEARS PENGEMBANGAN ( 2015-2017 )
KEG
IATA
N P
ENG
EMBA
NG
AN
PROJECT TASKS NILAI 2015
Instalasi Kampung Satu 21,500,000,000 21,500,000,000
Instalasi Persemaian 5,800,000,000 5,800,000,000
Pajak Pertambahan Nilai / PPN 10 % 2,730,000,000 2,730,000,000
-
-
-
Grand Total 30,030,000,000 30,030,000,000
URAIAN KEGIATAN OPTIMALISASI ( 2014-2019 )
IPA
KA
MP
UN
G B
UG
IS
PROJECT TASKS NILAI 2015
I UNIT AIR BAKU ( INTAKE ) :1 Perbaikan Pintu Air - 2 Normalisasi Das Aliran Sungai ( DAS ) - 3 Pembangunan Folder - II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) - - 2 Rehabilitasi / Penambahan Daya Listrik PLN ( 197 KVA + 78 KVA ) > Total +/- = 350 KVA 1,500,000,000 1,500,000,000 3 Rehabilitasi / Pembangunan Ruang gardu duduk/Panel Indux ( Trapo 350 KVA, cubical, Incoming out Going ) 3,500,000,000 3,500,000,000 4 Rehabilitasi Meter Indux ( Digital ) Air Baku, Pencuciaan ( Filter ) & Distribusi 2,000,000,000 2,000,000,000 5 Rehabilitasi sistim Pencucian Filter ( Gate Valve ), Tube setler dan Ruang Thomson 3,000,000,000 3,000,000,000 6 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME 3,000,000,000 3,000,000,000 7 Sistem Scada Pengolahan Air 60 lt/det 650,000,000 650,000,000 8 Pengadaan & Pemasangan Pompa kap.60 lt/det H=70 m 2,500,000,000 2,500,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA KAMP.BUGIS ) :1 Rehabilitasi Pipa Jaringan Jln Jend Sudirman ( Perempatan THM s/d Gedung Gitajalatama ) 4,000,000,000 4,000,000,000 2 Rehabilitasi Pipa Jaringan Kelurahan Kr. Anyar - Kelurahan Sebengkok 7,000,000,000 7,000,000,000 3 Rehabilitasi/Optimalisasi sistim NRW ( Penekanan Tingkat Kebocoran ) Distrik Metrik Area 3,500,000,000 3,500,000,000 4 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME ( Boster PUMP ) 4,000,000,000 4,000,000,000 5 Rehabilitasi sistim Perpipaan Jalur Yos Sudarso 1,000,000,000 1,000,000,000 6 Rehabilitas Reservoar 500 m3 & Perpipaan (gravitasi Karang Anyar s/d Sebengkok) 1,500,000,000 1,500,000,000 7 Pemutahiran Program GIS 1,500,000,000 1,500,000,000 IV UNIT SAMBUNGAN RUMAH :1 Rehabilitasi Sambungan Pipa Dinas dan Meter Air 1,650,000,000 1,650,000,000 2 Pengadaan & Pemasangan SR - - V UNIT SARANA PRASARANA KANTOR & PELAYANAN :1 Gedung Kantor - 2 Perluasan Kantor Pelayanan - 3 Rehabilitasi Kantor Pelayanan - 4 Perbaikan Jalan lingkungan - 5 Kendaraan Operasional (Roda empat & dua) - 6 pemutahiran Program Reading & Billing -
Sub Total 40,300,000,000 40,300,000,000
URAIAN KEGIATAN PENGEMBANGAN ( 2014-2019 )
IPA
KA
MP
UN
G S
AT
U
PROJECT TASKS NILAI 2015
I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :Pembuatan Perencanaan Pengembangan Sumber Air Baku :a. Embung Binalatung 3 (FS, AMDAL, DED)b. Pembangunan Pekerjaan Fisik Embung Binalatung 3 -
II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED ) 500,000,000 500,000,000 2 Pemasangan Daya Listrik PLN > 1000 KVA - - 3 Pengadaan / Pemasangan Genset Kapasitas > 1000 KVA 3,500,000,000 3,500,000,000 4 Pengadaan / Pemasangan pompa, Panel Inverter lengkap dengan ME 1,500,000,000 1,500,000,000 5 Pengadaan / Pemasangan pompa Kimia Digital, Panel Inverter lengkap dengan ME 2,500,000,000 2,500,000,000 6 Pengadaan Peralatan Laboratarium 1,500,000,000 1,500,000,000 7 Pembangunan Gudang Bahan Kimia & Work Shop - III UNIT JARINGAN DISTRIBUSI ( ZONE IPA KAMP. SATU ) :1 Pengembangan Jaringan Air Bersih - -2 Pengembangan Jaringan Air Minum Zona Kampung Satu 1,500,000,000 1,500,000,000 3 Spam MBR P.P Jaringan Perpipaan Optimalisasi (Mamburungan) 3,500,000,000 3,500,000,000 4 PENGEMBANGAN / PEMBANGUNAN BOSTER PUMP, RESERVOIR DAN PERPIPAAN LOKASI :
a. Kecamatan Tarakan Timur, Mamburungan 5,000,000,000 5,000,000,000 b. Kecamatan Tarakan Timur, Kampung Enam - -
5 Pengembangan Jaringan Air Minum Wilayah Lingkas Ujung & Gn. Lingkas 2,000,000,000 2,000,000,000 6 Pengembangan Jaringan Air Minum Wilayah Mamburungan TimurIV UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 5000 unit - -
Sub Total 21,500,000,000 21,500,000,000
IPA
PE
RS
EM
AIA
N
PROJECT TASKS NILAI 2015
I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 500,000,000 500,000,000 II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 300,000,000 300,000,000 2 Pemasangan Daya Listrik PLN > 1000 KVA - - 3 Pengadaan / Pemasangan Genset Kapasitas > 1000 KVA - - 4 Pengadaan / Pemasangan pompa, Panel Inverter lengkap dengan ME 1,500,000,000 1,500,000,000 5 Pengadaan / Pemasangan pompa Kimia Digital, Panel Inverter lengkap dengan ME 2,500,000,000 2,500,000,000 6 Pengadaan Peralatan Laboratarium 1,000,000,000 1,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA KAMP. SATU ) :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) - -2 Pengembangan Jaringan Air Minum Zone IPA Persemaian - 3 Pengembangan Jaringan Perpipaan Jln. Aki Babu, Suaran Juata Lembah - 6 PENGEMBANGAN / PEMBANGUNAN BOSTER PUMP, RESERVOIR DAN PERPIPAAN LOKASI :
c. Kecamatan Tarakan Tengah ( Jln Gn. Selumit / Gn. Daeng ) - - IV UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 3000 unit - -
Sub Total 5,800,000,000 5,800,000,000
KEGIATAN MURNI OPTIMALISASI ( 2015 )
KEG
IATA
N O
PTIM
ALIS
ASI PROJECT TASKS INVESTASI 2014-2019 2015
Instalasi Penolahan Air ( IPA ) Kampung Satu 27,162,500,000 27,162,500,000
Instalasi Pengolahan Air ( IPA ) Kampung Bugis 65,237,000,000 65,237,000,000
Instalasi Pengolahan Air ( IPA ) Persemaian 12,012,500,000 12,012,500,000
Instalasi Pengolahan Air ( IPA ) Juata Laut 9,897,500,000 9,897,500,000
Grand Total 114,309,500,000 114,309,500,000
KEGIATAN MURNI PENGEMBANGAN ( 2015 )
KEG
IATA
N P
ENG
EMBA
NG
AN
PROJECT TASKS INVESTASI 2014-2019 2015
Instalasi Kampung Satu -
Instalasi Kampung Bugis -
Instalasi Persemaian 9,700,000,000 9,700,000,000
Instalasi Juata Laut 20,950,000,000 20,950,000,000
Instalasi Pantai Amal -
Instalasi Rawasari -
Instalasi Batu Mapan -
Grand Total 30,650,000,000 30,650,000,000
URAIAN KEGIATAN OPTIMALISASI ( 2014-2019 )
IPA
KA
MP
UN
G S
AT
U
PROJECT TASKS INVESTASI 2014-2019 2015
I UNIT AIR BAKU ( INTAKE ) :1 Perbaikan Pintu Air - -2 Normalisasi Das Aliran Sungai ( DAS ) 150,000,000 150,000,000 3 Pembuatan Ponton Intake Embung Binalatung & Jaringan Transmisi Air Baku 2,000,000,000 2,000,000,000 4 Pengadaan & Pemasangan Pompa Submersible kap.250 l/det H=40m 1,000,000,000 1,000,000,000 II UNIT PENGOLAHAN :1 Rencana Pekerjaan Bongkar/Pasang Instalasi Pengolahan Air (IPA) 30 l/det dan 60 l/det - -2 Pembuatan Sarana Olah Raga bagi Masyarakat sekitar - 3 Sistem Scada Pengolahan Air 90 lt/det 4,000,000,000 4,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA KAMP. SATU ) :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED ) - -2 Rehabilitasi Pipa Jaringan ( Kelurahan Kp. Empat - Kamp. Enam ) - -3 Rehabilitasi Pipa Jaringan Kelurahan Lingkas Ujung - -4 Rehabilitasi Pipa Jaringan Kelurahan Gn Lingkas - Kelurahan Sebengkok 2,500,000,000 2,500,000,000 5 Rehabilitasi Pipa Jaringan Kelurahan Pamusian 1,500,000,000 1,500,000,000 6 SPAM MBR P/P Jaringan Perpipaan Optimalisasi ( Mamburungan ) 1,500,000,000 1,500,000,000 7 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME ( Boster PUMP ) 1,500,000,000 1,500,000,000 8 Boster Pump Gunung Lingkas & Reservoar 250 m3 5,000,000,000 5,000,000,000 9 Boster Pump Kamp.Empat & Reservoar 250 m3 5,000,000,000 5,000,000,000 IV UNIT SAMBUNGAN RUMAH :1 Rehabilitasi Sambungan Pipa Dinas dan Meter Air 412,500,000 412,500,000 2 Pengadaan & Pemasangan SR 2,600,000,000 2,600,000,000
Sub Total 27,162,500,000 27,162,500,000
IPA
KA
MP
UN
G B
UG
IS
PROJECT TASKS INVESTASI 2014-2019 2015
I UNIT AIR BAKU ( INTAKE ) :1 Perbaikan Pintu Air 2,500,000,000 2,500,000,000 2 Normalisasi Das Aliran Sungai ( DAS ) 1,500,000,000 1,500,000,000 3 Pembangunan Folder 15,000,000,000 15,000,000,000 II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) - - 2 Rehabilitasi / Penambahan Daya Listrik PLN ( 197 KVA + 78 KVA ) > Total +/- = 350 KVA 1,500,000,000 1,500,000,000 3 Rehabilitasi / Pembangunan Ruang gardu duduk/Panel Indux ( Trapo 350 KVA, cubical, Incoming out Going ) 3,500,000,000 3,500,000,000 4 Rehabilitasi Meter Indux ( Digital ) Air Baku, Pencuciaan ( Filter ) & Distribusi 2,000,000,000 2,000,000,000 5 Rehabilitasi sistim Pencucian Filter ( Gate Valve ), Tube setler dan Ruang Thomson 3,000,000,000 3,000,000,000 6 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME 3,000,000,000 3,000,000,000 7 Sistem Scada Pengolahan Air 60 lt/det 650,000,000 650,000,000 8 Pengadaan & Pemasangan Pompa kap.60 lt/det H=70 m 2,500,000,000 2,500,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA KAMP.BUGIS ) :1 Rehabilitasi Pipa Jaringan Jln Jend Sudirman ( Perempatan THM s/d Gedung Gitajalatama ) - -2 Rehabilitasi Pipa Jaringan Kelurahan Kr. Anyar - Kelurahan Sebengkok 7,000,000,000 7,000,000,000 3 Rehabilitasi/Optimalisasi sistim NRW ( Penekanan Tingkat Kebocoran ) Distrik Metrik Area 3,500,000,000 3,500,000,000 4 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME ( Boster PUMP ) 4,000,000,000 4,000,000,000 5 Rehabilitasi sistim Perpipaan Jalur Yos Sudarso 1,000,000,000 1,000,000,000 6 Rehabilitas Reservoar 500 m3 & Perpipaan (gravitasi Karang Anyar s/d Sebengkok) 1,500,000,000 1,500,000,000 7 Pemutahiran Program GIS 1,500,000,000 1,500,000,000 IV UNIT SAMBUNGAN RUMAH :1 Rehabilitasi Sambungan Pipa Dinas dan Meter Air 1,650,000,000 1,650,000,000 2 Pengadaan & Pemasangan SR 1,300,000,000 1,300,000,000 V UNIT SARANA PRASARANA KANTOR & PELAYANAN :1 Gedung Kantor 7,500,000,000 7,500,000,000 2 Perluasan Kantor Pelayanan - 3 Rehabilitasi Kantor Pelayanan 450,000,000 450,000,000 4 Perbaikan Jalan lingkungan - 5 Kendaraan Operasional (Roda empat & dua) 75,000,000 75,000,000 6 pemutahiran Program Reading & Billing 612,000,000 612,000,000
Sub Total 65,237,000,000 65,237,000,000
IPA
PE
RS
EM
AIA
N
PROJECT TASKS INVESTASI 2014-2019 2015
I UNIT AIR BAKU ( INTAKE ) : 4861 Perbaikan Pintu Air 1,000,000,000 1,000,000,000 2 Normalisasi Das Aliran Sungai ( DAS ) 500,000,000 500,000,000 3 Pembangunan Folder S Persemaian (DED & Konstruksi) - II UNIT PENGOLAHAN :1 Rehabilitasi / Penambahan Daya Listrik PLN (2 x 197 KVA, Embung 66 KVA ) + 92 KVA > Total +/- = 60 - -2 Rehabilitasi / Pembangunan Ruang gardu duduk/Panel Indux ( Trapo 1250 KVA, Kubical, Incoming out Going - -3 Rehabilitasi Meter Indux ( Digital ) Air Baku, Pencuciaan ( Filter ) & Distribusi - 2,000,000,000 4 Rehabilitasi sistim Pencucian Filter ( Gate Valve ), Tube setler - -5 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME - -6 Perbaikan Reservoir 500 m3 - -7 Interkoneksi Jaringan Distribusi /Pompa 1,000,000,000 1,000,000,000 8 Rehab Jaringan Distribusi Akibalak- Lestari 500,000,000 500,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA PERSEMAIAN ) WILAYAH JALUR YOS.S & L.UJUNG :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) - -2 - -3 - -4 - -5 SPAM MBR P/P Jaringan Perpipaan Optimalisasi Kota Tarakan - -6 Rehabilitasi/Optimalisasi sistim NRW ( Penekanan Tingkat Kebocoran ) Distrik Metrik Area 3,000,000,000 3,000,000,000 7 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME ( Boster PUMP ) 2,500,000,000 2,500,000,000 8 Interkoneksi Jaringan Distribusi Reservoar Peningki-Jl.Cendawasih 450,000,000 450,000,000 IV UNIT SAMBUNGAN RUMAH :1 Rehabilitasi Sambungan Pipa Dinas dan Meter Air 412,500,000 412,500,000 2 Pengadaan & Pemasangan SR 650,000,000 650,000,000
Sub Total 10,012,500,000 12,012,500,000
SPAM Khusus KEK ( P/P Pipa HDPE Ø 150 mm - Ø 75 mm, Panjang = 8.200 m' )SPAM MBR P/P Pipa HDPE Ø 150 mm-Ø 75 mm ( IKK Persemaian, Kr.Harapan,Kec.Tarakan Barat )SPAM Khusus PPI Tengkayu II ( P/P Pipa HDPE Ø 150 mm - Ø 75 mm, Panjang = 2.815 m' )
IPA
JU
AT
A L
AU
T
PROJECT TASKS INVESTASI 2014-2019 2015
I UNIT AIR BAKU ( INTAKE ) :1 Perbaikan Pintu Air & Pemasangan turap siring - -2 Normalisasi Das Aliran Sungai ( DAS ) 75,000,000 75,000,000 II UNIT PENGOLAHAN :1 Rehabilitasi / Penambahan Daya Listrik PLN (82.500 KVA + 67,500 KVA > Total +/- = 150 KVA - -2 Rehabilitasi / Pembangunan Ruang gardu duduk/Panel Indux ( Trapo 200 KVA, Kubical, Incoming out Going ) - -1 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME 1,000,000,000 1,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA JUATA LAUT ) WILAYAH PERUM PNS, KORPRI & INTRACA : 1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 1,000,000,000 1,000,000,000 2 Rehabilitasi Jaringan Pipa Transmisi / Distribusi Air Bersih 4,000,000,000 4,000,000,000 3 Rehabilitasi Jaringan Pipa Distribusi Air Bersih 1,000,000,000 1,000,000,000 4 Rehabilitasi/Optimalisasi sistim NRW ( Penekanan Tingkat Kebocoran ) Distrik Metrik Area 500,000,000 500,000,000 5 Rehabilitasi sistim Perpompaan, Panel Inverter dan ME ( Boster PUMP ) - - 6 Laboratorium & Gudang, Jalan Lingkungan, dll 1,000,000,000 1,000,000,000 IV UNIT SAMBUNGAN RUMAH :1 Rehabilitasi Sambungan Pipa Dinas dan Meter Air 412,500,000 412,500,000 2 Pengadaan & Pemasangan SR 910,000,000 910,000,000
Sub Total 9,897,500,000 9,897,500,000
URAIAN KEGIATAN PENGEMBANGAN ( 2014-2019 )
IPA
KA
MP
UN
G S
AT
U
PROJECT TASKS INVESTASI 2014-2019 2015
I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :Pembuatan Perencanaan Pengembangan Sumber Air Baku :a. Embung Binalatung 3 (FS, AMDAL, DED) 1,500,000,000 b. Pembangunan Pekerjaan Fisik Embung Binalatung 3 -
II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED ) 500,000,000 500,000,000 2 Pemasangan Daya Listrik PLN > 1000 KVA - - 3 Pengadaan / Pemasangan Genset Kapasitas > 1000 KVA 3,500,000,000 3,500,000,000 4 Pengadaan / Pemasangan pompa, Panel Inverter lengkap dengan ME 1,500,000,000 1,500,000,000 5 Pengadaan / Pemasangan pompa Kimia Digital, Panel Inverter lengkap dengan ME 2,500,000,000 2,500,000,000 6 Pengadaan Peralatan Laboratarium 1,500,000,000 1,500,000,000 7 Pembangunan Gudang Bahan Kimia & Work Shop - III UNIT JARINGAN DISTRIBUSI ( ZONE IPA KAMP. SATU ) :1 Pengembangan Jaringan Air Bersih - -2 Pengembangan Jaringan Air Minum Zona Kampung Satu 1,500,000,000 1,500,000,000 3 Spam MBR P.P Jaringan Perpipaan Optimalisasi (Mamburungan) 3,500,000,000 3,500,000,000 4 PENGEMBANGAN / PEMBANGUNAN BOSTER PUMP, RESERVOIR DAN PERPIPAAN LOKASI :
a. Kecamatan Tarakan Timur, Mamburungan 5,000,000,000 5,000,000,000 b. Kecamatan Tarakan Timur, Kampung Enam - -
5 Pengembangan Jaringan Air Minum Wilayah Lingkas Ujung & Gn. Lingkas 2,000,000,000 2,000,000,000 6 Pengembangan Jaringan Air Minum Wilayah Mamburungan TimurIV UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 5000 unit 6,500,000,000 6,500,000,000
Sub Total 29,500,000,000 28,000,000,000
IPA
KA
MP
UN
G B
UG
IS
PROJECT TASKS INVESTASI 2014-2019 2015
I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 500,000,000 500,000,000 a Daerah Aliran Sungai ( DAS ) - -b Pembangunan Folder 15,000,000,000 15,000,000,000 II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 350,000,000 350,000,000 2 Uprating IPA - 3 Pengadaan / Pemasangan Genset Kapasitas > 350 KVA - - 4 Pengadaan / Pemasangan pompa, Panel Inverter lengkap dengan ME 1,500,000,000 1,500,000,000 5 Pengadaan / Pemasangan pompa Kimia Digital, Panel Inverter lengkap dengan ME 1,500,000,000 1,500,000,000 6 Pengadaan Peralatan Laboratarium 1,000,000,000 1,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA KAMP. BUGIS ) :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 1,000,000,000 1,000,000,000 2 Pengembangan Jaringan Air Bersih - 3 Reservoar Karang Balik & Perpipaan Tranmisi Air Bersih - 4 Booster Pump & Reservoar Gunung Selumit - IV UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 825 unit 1,072,500,000 1,072,500,000 2 Review Master Plan 750,000,000 3 Corporate Plan 2019-2024
Sub Total 21,922,500,000 22,672,500,000
IPA
PE
RS
EM
AIA
N
PROJECT TASKS INVESTASI 2014-2019 2015
I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 500,000,000 500,000,000 II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 300,000,000 300,000,000 2 Pemasangan Daya Listrik PLN > 1000 KVA - - 3 Pengadaan / Pemasangan Genset Kapasitas > 1000 KVA - - 4 Pengadaan / Pemasangan pompa, Panel Inverter lengkap dengan ME 1,500,000,000 1,500,000,000 5 Pengadaan / Pemasangan pompa Kimia Digital, Panel Inverter lengkap dengan ME 2,500,000,000 2,500,000,000 6 Pengadaan Peralatan Laboratarium 1,000,000,000 1,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA KAMP. SATU ) :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) - -2 Pengembangan Jaringan Air Minum Zone IPA Persemaian - 3 Pengembangan Jaringan Perpipaan Jln. Aki Babu, Suaran Juata Lembah - 6 PENGEMBANGAN / PEMBANGUNAN BOSTER PUMP, RESERVOIR DAN PERPIPAAN LOKASI :
c. Kecamatan Tarakan Tengah ( Jln Gn. Selumit / Gn. Daeng ) - - IV UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 3000 unit 3,900,000,000 3,900,000,000
Sub Total 9,700,000,000 9,700,000,000
IPA
JU
AT
A L
AU
T
PROJECT TASKS INVESTASI 2014-2019 2015
I UNIT AIR BAKU ( INTAKE ) DAN BENDUNGAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) 2,400,000,000 2,400,000,000 a Embung Belalung - -b Embung Maya - -II UNIT PENGOLAHAN :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) - - 2 Pengembangan IPA Juata Laut ( Eksisting ) 2,500,000,000 2,500,000,000 3 Pengembangan IPA Juata Laut ( embung Bengawan ) - 4 Pengadaan / Pemasangan Genset Kapasitas > 350 KVA - 5 Pengadaan / Pemasangan pompa, Panel Inverter lengkap dengan ME - 6 Pengadaan / Pemasangan pompa Kimia Digital, Panel Inverter lengkap dengan ME - 7 Pengadaan Peralatan Laboratarium 1,000,000,000 1,000,000,000 III UNIT JARINGAN DISTRIBUSI ( ZONE IPA JUATA LAUT ) :1 Pembuatan Perencanaan Sistim Penyediaan Air Bersih ( DED & Studi Kelayakan ) - -2 Pengembangan Jaringan Zona IPA Juata Laut 1,000,000,000 1,000,000,000 3 Pengembangan Jaringan Perpipaan Jalan Aji Iskandar 3,500,000,000 3,500,000,000 4 Pengembangan Jaringan Pelayanan Air Bersih Intraca Tahap 3 2,500,000,000 2,500,000,000 5 Pengembangan Jaringan Pelayanan Air Bersih Kawasan Perumahan PNS 3,100,000,000 3,100,000,000 6 Pengembangan Jaringan Perpipaan Jalan Sei Bengawan 3,000,000,000 3,000,000,000 IV UNIT SAMBUNGAN RUMAH :1 Pengadaan Dan Pemasangan Sambungan Rumah ( SR ) 1500 unit 1,950,000,000 1,950,000,000
Sub Total 20,950,000,000 20,950,000,000