RENCANA REHABILITASIRUANG KELAS SEKOLAH DASAR

DANA ALOKASI KHUSUS (DAK) TAHUN 2011 (LUNCURAN)

NO KABUPATEN NAMA SEKOLAH KECAMATAN NILAI JUMLAH TOTAL JUMLAH TOTAL REALISASI SELISIH

DAK (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)1 PANDEGLANG SDN BANJARMASIN 1 CARITA 7 73,500,000 - 514,500,000 514,500,000 #VALUE! #VALUE!2 PANDEGLANG SDN SINDANGLAUT 1 CARITA 3 73,500,000 - 220,500,000 220,500,000 #REF! #REF!3 PANDEGLANG SDN SUKARAME 1 CARITA 7 73,500,000 - 514,500,000 514,500,000 #REF! #REF!4 PANDEGLANG SDN TEMBONG 1 CARITA 2 73,500,000 - 147,000,000 147,000,000 #REF! #REF!5 PANDEGLANG SDN BABAKANLOR 3 CIKEDAL 3 73,500,000 - 220,500,000 220,500,000 #REF! #REF!6 PANDEGLANG SDN CENING 1 CIKEDAL 8 73,500,000 - 588,000,000 588,000,000 #REF! #REF!7 PANDEGLANG SDN DAHU 1 CIKEDAL 6 73,500,000 - 441,000,000 441,000,000 #REF! #REF!8 PANDEGLANG SDN DAHU 2 CIKEDAL 4 73,500,000 - 294,000,000 294,000,000 #REF! #REF!9 PANDEGLANG SDN KARYASARI 3 CIKEDAL 3 73,500,000 - 220,500,000 220,500,000 #REF! #REF!

10 PANDEGLANG SDN KARYA UTAMA 1 CIKEDAL 6 73,500,000 - 441,000,000 441,000,000 #REF! #REF!11 PANDEGLANG SDN KARYA UTAMA 2 CIKEDAL 4 73,500,000 - 294,000,000 294,000,000 #REF! #REF!12 PANDEGLANG SDN TEGAL 1 CIKEDAL 2 73,500,000 - 147,000,000 147,000,000 #REF! #REF!

Jumlah 55 4,042,500,000 4,042,500,000 #VALUE! #VALUE!

BIAYA MEBEULAIR

Page 2: RAB PAGAR.xls

REKAPITULASI RINCIAN ANGGARAN BIAYA

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Sindanglaut 1 Kecamatan CaritaLokasi : Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN JUMLAH (Rp.)

A. REHABILITASI 3 (TIGA) RUANG KELAS

I. PEKERJAAN PERSIAPAN 3,615,680.00

II. PEKERJAAN TANAH DAN URUGAN 1,393,249.60

III. PEKERJAAN BETON #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN #REF!

V. PEKERJAAN LANTAI #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA #REF!

VII. PEKERJAAN ATAP DAN PLAFOND #REF!

VIII. PEKERJAAN PENGECATAN 74,261,914.32

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE #REF!

REAL COST #REF!

PPN 10% #REF!

JUMLAH TOTAL #REF!

DIBULATKAN #REF!

Terbilang : " Dua Ratus Dua Puluh Juta Lima Ratus Ribu Rupiah "

Pandeglang, Juni 2012

Konsultan PerencanaPT. SAKHA MULTITAMA

TB. EKA NUGRAHA, K.E.R, S.KomD i r e k t u r

Page 3: RAB PAGAR.xls

RINCIAN ANGGARAN BIAYA (RAB)

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Sindanglaut 1 Kecamatan CaritaLokasi : Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN VOLUME

1 2 3 4 5

A. REHABILITASI 3 (TIGA) RUANG KELAS

I. PEKERJAAN PERSIAPAN

1 Pek. Papan nama proyek 1.00 bh 365,680.00 365,680.00

2 Pek. Bongkaran 1.00 ls 1,500,000.00 1,500,000.00

3 Biaya Dokumentasi dan Pelaporan 1.00 ls 1,750,000.00 1,750,000.00

Jumlah I 3,615,680.00

II. PEKERJAAN TANAH DAN URUGAN

1 Pek. Urugan pasir dibawah lantai 9.44 m3 147,590.00 1,393,249.60

Jumlah II 1,393,249.60

III. PEKERJAAN BETON

1 Pek. Kolom struktur 15/20 beton Site Mix K.175 2.10 m3 #REF! #REF!2 Pek. Balok teras 15/20 beton Site Mix K.175 0.88 m3 #REF! #REF!3 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 1.99 m3 #REF! #REF!4 Pek. Pasangan bata pondasi rabat ad. 1:5 27.50 m2 89,590.00 2,463,725.00 5 Pek. Rabat beton tumbuk ad. 1:3:5 2.76 m3 373,360.00 1,030,473.60

Jumlah III #REF!IV. PEKERJAAN DINDING DAN PLESTERAN

1 Pek. Dinding bata ad. 1:5 96.69 m2 89,590.00 8,662,457.10 2 Pek. Plesteran dinding ad. 1:5 + acian 410.20 m2 46,330.00 19,004,566.00 3 Pek. Plesteran beton ad 1:3 + acian 33.63 m2 #REF! #REF!4 Pek. Dinding dan kolom teras keramik 20/25 30.30 m2 26,260.00 795,678.00

Jumlah IV #REF!V. PEKERJAAN LANTAI

1 Pek. Lantai keramik 30x30 cm setara KW II 180.45 m2 #REF! #REF! Jumlah V #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA 1 Pek. Kusen pintu P1 3.00 bh #REF! #REF!2 Pek. Kusen jendela J1 12.00 bh #REF! #REF!3 Pek. Kusen bouvenlight BV1 3.00 bh #REF! #REF!

Jumlah VI #REF!VII. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 279.50 m2 #REF! #REF!2 Pek. Genteng metal lapis pasir 279.50 m2 #REF! #REF!3 Pek. Nok genteng metal lapis pasir 23.50 m' #REF! #REF!4 Pek. Flashing listplank metal lapis pasir 24.60 m' #REF! #REF!5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 242.65 m2 5,565,210.00 1,350,398,206.50 6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 71.50 m' #REF! #REF!7 Pek. List plafond profil kayu 273.80 m' #REF! #REF!

Jumlah VII #REF!VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 461.40 m2 53,710.00 24,781,659.72 2 Pek. Pengecatan plafond sek. Decoplus 242.65 m2 143,920.00 34,922,188.00 3 Pek. Pengecatan listplank sek. Glotex 21.45 m2 122,770.00 2,633,416.50 4 Pek. Pengecatan kusen pintu/jendela sek. Glotex 97.13 m2 122,770.00 11,924,650.10

Jumlah VIII 74,261,914.32 IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE

1 Pas. Instalasi titik lampu 15.00 titik #REF! #REF!2 Pas. Instalasi titik stop kontak 3.00 titik #REF! #REF!3 Pas. Saklar tunggal broco 1.00 bh #REF! #REF!4 Pas. Saklar ganda broco 3.00 bh #REF! #REF!5 Pas. Stop kontak broco 3.00 bh #REF! #REF!6 Pas. Lampu PLC 8 watt philips 15.00 bh #REF! #REF!7 Pas. Panel MCB 5x10 A 1.00 bh #REF! #REF!

Jumlah IX #REF!

Jumlah Total #REF!

HARGA SATUAN(Rp.)

J U M L A H(Rp.)

Page 4: RAB PAGAR.xls

REKAPITULASI RENCANA ANGGARAN BIAYA

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Sukarame 1 Kecamatan CaritaLokasi : Kecamatan Carita Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN JUMLAH (Rp.)

A. REHABILITASI 6 (ENAM) RUANG KELAS + RUANG GURU

I. PEKERJAAN PERSIAPAN 5,615,680.00

II. PEKERJAAN TANAH DAN URUGAN 712,544.80

III. PEKERJAAN PONDASI DAN BETON #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN #REF!

V. PEKERJAAN LANTAI #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA #REF!

VII. PEKERJAAN ATAP DAN PLAFOND #REF!

VIII. PEKERJAAN PENGECATAN 153,323,261.25

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE #REF!

REAL COST #REF!

PPN 10% #REF!

JUMLAH TOTAL #REF!

DIBULATKAN #REF!

Terbilang : " Empat Ratus Tiga Puluh Empat Juta Tujuh Ratus Tiga Belas Ribu Rupiah "

Pandeglang, Juni 2012

Konsultan PerencanaPT. SAKHA MULTITAMA

TB. EKA NUGRAHA, K.E.R, S. KomD i r e k t u r

Page 5: RAB PAGAR.xls

RENCANA ANGGARAN BIAYA (RAB)

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Sukarame 1 Kecamatan CaritaLokasi : Kecamatan Carita Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN VOLUME

1 2 3 4 5

A. REHABILITASI 6 (ENAM) RUANG KELAS + RUANG GURU

I. PEKERJAAN PERSIAPAN

1 Pek. Papan nama proyek 1.00 bh 365,680.00 365,680.00

2 Pek. Bongkaran 1.00 ls 3,500,000.00 3,500,000.00

3 Biaya Dokumentasi dan Pelaporan 1.00 ls 1,750,000.00 1,750,000.00

Jumlah I 5,615,680.00

II. PEKERJAAN TANAH DAN URUGAN

1 Pek. Galian tanah pondasi teras 6.98 m3 38,980.00 272,080.40

2 Pek. Urugan tanah kembali 4.14 m3 12,990.00 53,778.60

3 Pek. Urugan pasir dibawah pondasi teras 0.28 m3 147,590.00 41,325.20

4 Pek. Urugan pasir dibawah lantai 2.34 m3 147,590.00 345,360.60

Jumlah II 712,544.80

III. PEKERJAAN PONDASI DAN BETON

1 Pas. Pondasi batu kali ad. 1:5 teras 2.57 m3 #REF! #REF!

2 Pas. Rollag batu bata ad. 1:5 teras 2.17 m3 597,565.30 1,296,716.70

3 Pek. Sloof 15/20 beton Site Mix K.175 teras 1.52 m3 #REF! #REF!

4 Pek. Kolom struktur 15/20 beton Site Mix K.175 4.62 m3 #REF! #REF!

5 Pek. Kolom teras 15/20 beton Site Mix K.175 1.43 m3 #REF! #REF!

6 Pek. Kolom praktis 12/12 beton Site Mix K.175 0.45 m3 #REF! #REF!

7 Pek. Balok teras 15/20 beton Site Mix K.175 2.27 m3 #REF! #REF!

8 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 4.11 m3 #REF! #REF!

9 Pek. Saluran air hujan L=20 cm 123.00 m' 188,470.00 23,181,810.00

10 Pek. Rabat beton tumbuk ad. 1:3:5 3.88 m3 373,360.00 1,448,636.80

Jumlah III #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN

1 Pek. Dinding bata ad. 1:5 131.10 m2 89,590.00 11,745,249.00

2 Pek. Plesteran dinding ad. 1:5 + acian 287.23 m2 46,330.00 13,307,347.37

3 Pek. Plesteran beton ad 1:3 + acian 113.48 m2 #REF! #REF!

4 Pek. Dinding dan kolom teras keramik 20/25 55.92 m2 26,260.00 1,468,459.20

Jumlah IV #REF!

V. PEKERJAAN LANTAI

1 Perbaikan Lantai keramik 30x30 cm setara KW II 171.20 m2 #REF! #REF!

Jumlah V #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA 1 Pek. Kusen pintu P1 6.00 bh #REF! #REF!2 Pek. Kusen pintu P2 1.00 bh #REF! #REF!3 Pek. Kusen jendela J1 23.00 bh #REF! #REF!4 Pek. Kusen bouvenlight BV1 6.00 bh #REF! #REF!

Jumlah VI #REF!

VII. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 585.00 m2 #REF! #REF!

2 Pek. Genteng metal lapis pasir 585.00 m2 #REF! #REF!

3 Pek. Nok genteng metal lapis pasir 62.10 m' #REF! #REF!

4 Pek. Flashing listplank metal lapis pasir 23.30 m' #REF! #REF!

5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 506.70 m2 5,565,210.00 2,819,891,907.00

6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 103.40 m' #REF! #REF!

7 Pek. List plafond profil kayu 544.20 m' #REF! #REF!

8 Pek. Talang miring seng BJLS 28 11.10 m' #REF! #REF!

Jumlah VII #REF!

HARGA SATUAN(Rp.)

J U M L A H(Rp.)

Page 6: RAB PAGAR.xls

1 2 3 4 5

VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 965.17 m2 53,710.00 51,839,012.15

2 Pek. Pengecatan plafond sek. Decoplus 506.70 m2 143,920.00 72,924,264.00

3 Pek. Pengecatan listplank sek. Glotex 31.02 m2 122,770.00 3,808,325.40

4 Pek. Pengecatan kusen pintu/jendela sek. Glotex 201.61 m2 122,770.00 24,751,659.70

Jumlah VIII 153,323,261.25

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE

1 Pas. Instalasi titik lampu 36.00 titik #REF! #REF!

2 Pas. Instalasi titik stop kontak 7.00 titik #REF! #REF!

3 Pas. Saklar tunggal broco 1.00 bh #REF! #REF!

4 Pas. Saklar ganda broco 7.00 bh #REF! #REF!

5 Pas. Stop kontak broco 7.00 bh #REF! #REF!

6 Pas. Lampu PLC 8 watt philips 36.00 bh #REF! #REF!

7 Pas. Panel MCB 5x10 A 1.00 bh #REF! #REF!

Jumlah IX #REF!

Jumlah Total #REF!

Page 7: RAB PAGAR.xls

REKAPITULASI RENCANA ANGGARAN BIAYA

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Tembong 1 Kecamatan CaritaLokasi : Kecamatan Carita Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN JUMLAH (Rp.)

A. REHABILITASI 2 (DUA) RUANG KELAS

I. PEKERJAAN PERSIAPAN 3,115,680.00

II. PEKERJAAN TANAH DAN URUGAN 333,928.90

III. PEKERJAAN PONDASI DAN BETON #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN #REF!

V. PEKERJAAN LANTAI #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA #REF!

VII. PEKERJAAN ATAP DAN PLAFOND #REF!

VIII. PEKERJAAN PENGECATAN 55,646,978.10

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE #REF!

REAL COST #REF!

PPN 10% #REF!

JUMLAH TOTAL #REF!

DIBULATKAN #REF!

Terbilang : " Seratus Empat Puluh Tujuh Juta Rupiah "

Pandeglang, Juni 2012

Konsultan PerencanaPT. SAKHA MULTITAMA

TB. EKA NUGRAHA, K.E.R, S. KomD i r e k t u r

Page 8: RAB PAGAR.xls

RENCANA ANGGARAN BIAYA (RAB)

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Tembong 1 Kecamatan CaritaLokasi : Kecamatan Carita Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN VOLUME

1 2 3 4 5A. REHABILITASI 2 (DUA) RUANG KELAS I. PEKERJAAN PERSIAPAN

1 Pek. Papan nama proyek 1.00 bh 365,680.00 365,680.00 2 Pek. Bongkaran 1.00 ls 1,000,000.00 1,000,000.00 3 Biaya Dokumentasi dan Pelaporan 1.00 ls 1,750,000.00 1,750,000.00

Jumlah I 3,115,680.00 II. PEKERJAAN TANAH DAN URUGAN

1 Pek. Galian tanah pondasi teras 2.57 m3 38,980.00 100,178.60 2 Pek. Urugan tanah kembali 1.52 m3 12,990.00 19,744.80 3 Pek. Urugan pasir dibawah pondasi teras 0.10 m3 147,590.00 14,759.00 4 Pek. Urugan pasir dibawah lantai 1.35 m3 147,590.00 199,246.50

Jumlah II 333,928.90 III. PEKERJAAN PONDASI DAN BETON

1 Pas. Pondasi batu kali ad. 1:5 teras 0.95 m3 #REF! #REF!2 Pas. Rollag batu bata ad. 1:5 teras 1.02 m3 597,565.30 609,516.61 3 Pek. Sloof 15/20 beton Site Mix K.175 teras 0.61 m3 #REF! #REF!4 Pek. Kolom teras 15/20 beton Site Mix K.175 0.53 m3 #REF! #REF!5 Pek. Balok teras 15/20 beton Site Mix K.175 0.63 m3 #REF! #REF!6 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 1.52 m3 #REF! #REF!7 Pek. Pasangan bata pondasi rabat ad. 1:5 6.00 m2 89,590.00 537,540.00 8 Pek. Rabat beton tumbuk ad. 1:3:5 1.12 m3 373,360.00 418,163.20

Jumlah III #REF!IV. PEKERJAAN DINDING DAN PLESTERAN

1 Pek. Dinding bata ad. 1:5 59.87 m2 89,590.00 5,363,753.30 2 Pek. Plesteran dinding ad. 1:5 + acian 235.17 m2 46,330.00 10,895,333.44 3 Pek. Plesteran beton ad 1:3 + acian 23.92 m2 #REF! #REF!4 Pek. Dinding dan kolom teras keramik 20/25 21.36 m2 26,260.00 560,913.60

Jumlah IV #REF!V. PEKERJAAN LANTAI

1 Perbaikan Lantai keramik 30x30 cm setara KW II 47.00 m2 #REF! #REF! Jumlah V #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA 1 Pek. Kusen pintu P1 2.00 bh #REF! #REF!2 Pek. Kusen jendela J1 8.00 bh #REF! #REF!3 Pek. Kusen bouvenlight BV1 2.00 bh #REF! #REF!

Jumlah VI #REF!VII. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 208.00 m2 #REF! #REF!2 Pek. Genteng metal lapis pasir 208.00 m2 #REF! #REF!3 Pek. Nok genteng metal lapis pasir 17.00 m' #REF! #REF!4 Pek. Flashing listplank metal lapis pasir 24.50 m' #REF! #REF!5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 179.20 m2 5,565,210.00 997,285,632.00 6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 58.50 m' #REF! #REF!7 Pek. List plafond profil kayu 201.30 m' #REF! #REF!

Jumlah VII #REF!VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 367.74 m2 53,710.00 19,751,315.40 2 Pek. Pengecatan plafond sek. Decoplus 179.20 m2 143,920.00 25,790,464.00 3 Pek. Pengecatan listplank sek. Glotex 17.55 m2 122,770.00 2,154,613.50 4 Pek. Pengecatan kusen pintu/jendela sek. Glotex 64.76 m2 122,770.00 7,950,585.20

Jumlah VIII 55,646,978.10 IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE

1 Pas. Instalasi titik lampu 10.00 titik #REF! #REF!2 Pas. Instalasi titik stop kontak 2.00 titik #REF! #REF!3 Pas. Saklar tunggal broco 1.00 bh #REF! #REF!4 Pas. Saklar ganda broco 2.00 bh #REF! #REF!5 Pas. Stop kontak broco 2.00 bh #REF! #REF!6 Pas. Lampu PLC 8 watt philips 10.00 bh #REF! #REF!7 Pas. Panel MCB 5x10 A 1.00 bh #REF! #REF!

Jumlah IX #REF! Jumlah Total #REF!

HARGA SATUAN(Rp.)

J U M L A H(Rp.)

Page 9: RAB PAGAR.xls

REKAPITULASI RINCIAN ANGGARAN BIAYA

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Babakanlor 3 Kecamatan CikedalLokasi : Kecamatan Cikedal Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN JUMLAH (Rp.)

A. REHABILITASI 3 (TIGA) RUANG KELAS

I. PEKERJAAN PERSIAPAN 3,615,680.00

II. PEKERJAAN TANAH DAN URUGAN 493,510.80

III. PEKERJAAN PONDASI DAN BETON #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN #REF!

V. PEKERJAAN LANTAI #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA #REF!

VII. PEKERJAAN ATAP DAN PLAFOND #REF!

VIII. PEKERJAAN PENGECATAN 78,149,869.45

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE #REF!

REAL COST #REF!

PPN 10% #REF!

JUMLAH TOTAL #REF!

DIBULATKAN #REF!

Terbilang : " Dua Ratus Dua Puluh Juta Lima Ratus Ribu Rupiah "

Pandeglang, Juni 2012

Konsultan PerencanaPT. SAKHA MULTITAMA

TB. EKA NUGRAHA, K.E.R, S.KomDirektur

Page 10: RAB PAGAR.xls

RINCIAN ANGGARAN BIAYA (RAB)

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Babakanlor 3 Kecamatan CikedalLokasi : Kecamatan Cikedal Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN VOLUME

1 2 3 4 5A. REHABILITASI 3 (TIGA) RUANG KELAS I. PEKERJAAN PERSIAPAN

1 Pek. Papan nama proyek 1.00 bh 365,680.00 365,680.00 2 Pek. Bongkaran 1.00 ls 1,500,000.00 1,500,000.00 3 Biaya Dokumentasi dan Pelaporan 1.00 ls 1,750,000.00 1,750,000.00

Jumlah I 3,615,680.00 II. PEKERJAAN TANAH DAN URUGAN

1 Pek. Galian tanah pondasi teras 3.68 m3 38,980.00 143,446.40 2 Pek. Urugan tanah kembali 2.18 m3 12,990.00 28,318.20 3 Pek. Urugan pasir dibawah pondasi teras 0.15 m3 147,590.00 22,138.50 4 Pek. Urugan pasir dibawah lantai 2.03 m3 147,590.00 299,607.70

Jumlah II 493,510.80 III. PEKERJAAN PONDASI DAN BETON

1 Pas. Pondasi batu kali ad. 1:5 teras 1.35 m3 #REF! #REF!2 Pas. Rollag batu bata ad. 1:5 teras 1.49 m3 597,565.30 890,372.30 3 Pek. Sloof 15/20 beton Site Mix K.175 teras 0.89 m3 #REF! #REF!4 Pek. Kolom struktur 15/20 beton Site Mix K.175 2.10 m3 #REF! #REF!5 Pek. Kolom teras 15/20 beton Site Mix K.175 0.75 m3 #REF! #REF!6 Pek. Kolom praktis 12/12 beton Site Mix K.175 0.15 m3 #REF! #REF!7 Pek. Balok teras 15/20 beton Site Mix K.175 0.98 m3 #REF! #REF!8 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 2.07 m3 #REF! #REF!9 Pek. Pasangan bata pondasi rabat ad. 1:5 27.92 m2 89,590.00 2,501,352.80

10 Pek. Rabat beton tumbuk ad. 1:3:5 2.84 m3 373,360.00 1,060,342.40 Jumlah III #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN 1 Pek. Dinding bata ad. 1:5 61.10 m2 89,590.00 5,473,949.00 2 Pek. Plesteran dinding ad. 1:5 + acian 291.22 m2 46,330.00 13,492,407.92 3 Pek. Plesteran beton ad 1:3 + acian 52.97 m2 #REF! #REF!4 Pek. Dinding dan kolom teras keramik 20/25 31.56 m2 26,260.00 828,765.60

Jumlah IV #REF!V. PEKERJAAN LANTAI

1 Perbaikan Lantai keramik 30x30 cm setara KW II 40.50 m2 #REF! #REF! Jumlah V #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA 1 Pek. Kusen pintu P1 3.00 bh #REF! #REF!2 Pek. Kusen jendela J1 12.00 bh #REF! #REF!3 Pek. Kusen bouvenlight BV1 3.00 bh #REF! #REF!

Jumlah VI #REF!VII. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 301.26 m2 #REF! #REF!2 Pek. Genteng metal lapis pasir 301.26 m2 #REF! #REF!3 Pek. Nok genteng metal lapis pasir 24.50 m' #REF! #REF!4 Pek. Flashing listplank metal lapis pasir 24.60 m' #REF! #REF!5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 261.16 m2 5,565,210.00 1,453,410,243.60 6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 73.50 m' #REF! #REF!7 Pek. List plafond profil kayu 281.80 m' #REF! #REF!

Jumlah VII #REF!VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 482.81 m2 53,710.00 25,931,993.65 2 Pek. Pengecatan plafond sek. Decoplus 261.16 m2 143,920.00 37,586,147.20 3 Pek. Pengecatan listplank sek. Glotex 22.05 m2 122,770.00 2,707,078.50 4 Pek. Pengecatan kusen pintu/jendela sek. Glotex 97.13 m2 122,770.00 11,924,650.10

Jumlah VIII 78,149,869.45 IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE

1 Pas. Instalasi titik lampu 15.00 titik #REF! #REF!2 Pas. Instalasi titik stop kontak 3.00 titik #REF! #REF!3 Pas. Saklar tunggal broco 1.00 bh #REF! #REF!4 Pas. Saklar ganda broco 3.00 bh #REF! #REF!5 Pas. Stop kontak broco 3.00 bh #REF! #REF!6 Pas. Lampu PLC 8 watt philips 15.00 bh #REF! #REF!7 Pas. Panel MCB 5x10 A 1.00 bh #REF! #REF!

Jumlah IX #REF! Jumlah Total #REF!

HARGA SATUAN(Rp.)

J U M L A H(Rp.)

Page 11: RAB PAGAR.xls

REKAPITULASI RINCIAN ANGGARAN BIAYA

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Cening 1 Kecamatan CikedalLokasi : Kecamatan Cikedal Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN JUMLAH (Rp.)

A. REHABILITASI 4 (EMPAT) R. KELAS, R. GURU DAN KM

I. PEKERJAAN PERSIAPAN 4,615,680.00

II. PEKERJAAN TANAH DAN URUGAN 115,943.67

III. PEKERJAAN PONDASI DAN BETON #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN #REF!

V. PEKERJAAN LANTAI #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA #REF!

VIII. PEKERJAAN ATAP DAN PLAFOND #REF!

IX. PEKERJAAN PENGECATAN 118,170,971.00

X. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE #REF!

B. REHABILITASI 1 (SATU) RUANG KELAS

I. PEKERJAAN PERSIAPAN 500,000.00

II. PEKERJAAN PONDASI DAN BETON #REF!

III. PEKERJAAN DINDING DAN PLESTERAN #REF!

IV. PEKERJAAN LANTAI #REF!

V. PEKERJAAN KUSEN PINTU DAN JENDELA #REF!

VI. PEKERJAAN ATAP DAN PLAFOND #REF!

VII. PEKERJAAN PENGECATAN 32,662,428.50

VIII. REHABILITASI 2 (DUA) RUANG KELAS #REF!

C. REHABILITASI 2 (DUA) RUANG KELAS

I. PEKERJAAN PERSIAPAN 1,000,000.00

II. PEKERJAAN TANAH DAN URUGAN 77,457.30

III. PEKERJAAN PONDASI DAN BETON #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN #REF!

V. PEKERJAAN LANTAI #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA #REF!

VII. PEKERJAAN ATAP DAN PLAFOND #REF!

VIII. PEKERJAAN PENGECATAN 51,637,925.10

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE #REF!

REAL COST #REF!

PPN 10% #REF!

JUMLAH TOTAL #REF!

DIBULATKAN #REF!

Terbilang : " Empat Ratus Tujuh Puluh Dua Juta Enam Ratus Lima Belas Ribu Rupiah "

Pandeglang, Juni 2012

Konsultan PerencanaPT. SAKHA MULTITAMA

TB. EKA NUGRAHA, K.E.R, S.KomDirektur

Page 12: RAB PAGAR.xls

RINCIAN ANGGARAN BIAYA (RAB)

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Cening 1 Kecamatan CikedalLokasi : Kecamatan Cikedal Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN VOLUME

1 2 3 4 5

A. REHABILITASI 4 (EMPAT) R. KELAS, R. GURU DAN KM

I. PEKERJAAN PERSIAPAN

1 Pek. Papan nama proyek 1.00 bh 365,680.00 365,680.00

2 Pek. Bongkaran 1.00 ls 2,500,000.00 2,500,000.00

3 Biaya Dokumentasi dan Pelaporan 1.00 ls 1,750,000.00 1,750,000.00

Jumlah I 4,615,680.00

II. PEKERJAAN TANAH DAN URUGAN

1 Pek. Galian tanah pondasi teras 2.20 m3 38,980.00 85,950.90

2 Pek. Urugan tanah kembali 1.31 m3 12,990.00 16,975.33

3 Pek. Urugan pasir dibawah pondasi teras 0.09 m3 147,590.00 13,017.44

Jumlah II 115,943.67

III. PEKERJAAN PONDASI DAN BETON

1 Pas. Pondasi batu kali ad. 1:5 teras 0.81 m3 #REF! #REF!

2 Pek. Kolom teras 15/20 beton Site Mix K.175 0.45 m3 #REF! #REF!

3 Pek. Balok teras 15/20 beton Site Mix K.175 1.21 m3 #REF! #REF!

4 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 3.29 m3 #REF! #REF!

Jumlah III #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN

1 Pek. Dinding bata ad. 1:5 16.00 m2 89,590.00 1,433,440.00

2 Pek. Plesteran dinding ad. 1:5 + acian 32.00 m2 46,330.00 1,482,560.00

3 Pek. Plesteran beton ad 1:3 + acian 32.68 m2 #REF! #REF!

4 Pek. Dinding dan kolom teras keramik 20/25 38.00 m2 26,260.00 997,880.00

Jumlah IV #REF!

V. PEKERJAAN LANTAI

1 Perbaikan Lantai keramik 30x30 cm setara KW II 24.00 m2 #REF! #REF!

Jumlah V #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA 1 Pek. Kusen pintu P1 5.00 bh #REF! #REF!2 Pek. Kusen jendela J1 18.00 bh #REF! #REF!

3 Pek. Kusen bouvenlight BV1 4.00 bh #REF! #REF!

4 Pek. Kusen pintu PVC 1.00 bh 308,000.00 308,000.00

Jumlah VI #REF!

VIII. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 460.18 m2 #REF! #REF!

2 Pek. Genteng metal lapis pasir 460.18 m2 #REF! #REF!

3 Pek. Nok genteng metal lapis pasir 46.20 m' #REF! #REF!

4 Pek. Flashing listplank metal lapis pasir 24.00 m' #REF! #REF!

5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 394.20 m2 5,565,210.00 2,193,805,782.00

6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 82.90 m' #REF! #REF!

7 Pek. List plafond profil kayu 388.50 m' #REF! #REF!

8 Pek. Talang miring seng BJLS 28 11.10 m' #REF! #REF!

Jumlah VIII #REF!

IX. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 740.55 m2 53,710.00 39,774,940.50

2 Pek. Pengecatan plafond sek. Decoplus 394.20 m2 143,920.00 56,733,264.00

3 Pek. Pengecatan listplank sek. Glotex 24.87 m2 122,770.00 3,053,289.90

4 Pek. Pengecatan kusen pintu/jendela sek. Glotex 151.58 m2 122,770.00 18,609,476.60

Jumlah IX 118,170,971.00

HARGA SATUAN(Rp.)

J U M L A H(Rp.)

Page 13: RAB PAGAR.xls

1 2 3 4 5

X. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE

1 Pas. Instalasi titik lampu 26.00 titik #REF! #REF!

2 Pas. Instalasi titik stop kontak 5.00 titik #REF! #REF!

3 Pas. Saklar tunggal broco 2.00 bh #REF! #REF!

4 Pas. Saklar ganda broco 5.00 bh #REF! #REF!

5 Pas. Stop kontak broco 5.00 bh #REF! #REF!

6 Pas. Lampu PLC 8 watt philips 26.00 bh #REF! #REF!

7 Pas. Panel MCB 5x10 A 1.00 bh #REF! #REF!

Jumlah X #REF!

Jumlah A #REF!

B. REHABILITASI 1 (SATU) RUANG KELAS

I. PEKERJAAN PERSIAPAN

1 Pek. Bongkaran 1.00 ls 500,000.00 500,000.00

Jumlah I 500,000.00

II. PEKERJAAN PONDASI DAN BETON

1 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 1.01 m3 #REF! #REF! Jumlah II #REF!

III. PEKERJAAN DINDING DAN PLESTERAN 1 Pek. Dinding bata ad. 1:5 14.00 m2 89,590.00 1,254,260.00 2 Pek. Plesteran dinding ad. 1:5 + acian 28.00 m2 46,330.00 1,297,240.00 3 Pek. Plesteran beton ad 1:3 + acian 6.00 m2 #REF! #REF!4 Pek. Dinding dan kolom teras keramik 20/25 11.64 m2 26,260.00 305,666.40

Jumlah III #REF!IV. PEKERJAAN LANTAI

1 Perbaikan Lantai keramik 30x30 cm setara KW II 14.40 m2 #REF! #REF! Jumlah IV #REF!

V. PEKERJAAN KUSEN PINTU DAN JENDELA 1 Pek. Kusen pintu P1 1.00 bh #REF! #REF!2 Pek. Kusen jendela J1 4.00 bh #REF! #REF!3 Pek. Kusen bouvenlight BV1 1.00 bh #REF! #REF!

Jumlah V #REF!VI. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 121.20 m2 #REF! #REF!2 Pek. Genteng metal lapis pasir 121.20 m2 #REF! #REF!3 Pek. Nok genteng metal lapis pasir 10.00 m' #REF! #REF!4 Pek. Flashing listplank metal lapis pasir 24.00 m' #REF! #REF!5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 108.60 m2 5,565,210.00 604,381,806.00 6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 44.50 m' #REF! #REF!7 Pek. List plafond profil kayu 127.70 m' #REF! #REF!

Jumlah VI #REF!VII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 209.76 m2 53,710.00 11,266,209.60 2 Pek. Pengecatan plafond sek. Decoplus 108.60 m2 143,920.00 15,629,712.00 3 Pek. Pengecatan listplank sek. Glotex 13.35 m2 122,770.00 1,638,979.50 4 Pek. Pengecatan kusen pintu/jendela sek. Glotex 33.62 m2 122,770.00 4,127,527.40

Jumlah VII 32,662,428.50 VIII. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE

1 Pas. Instalasi titik lampu 5.00 titik #REF! #REF!2 Pas. Instalasi titik stop kontak 1.00 titik #REF! #REF!3 Pas. Saklar tunggal broco 1.00 bh #REF! #REF!4 Pas. Saklar ganda broco 1.00 bh #REF! #REF!5 Pas. Stop kontak broco 1.00 bh #REF! #REF!6 Pas. Lampu PLC 8 watt philips 5.00 bh #REF! #REF!7 Pas. Panel MCB 5x10 A 1.00 bh #REF! #REF!

Jumlah VIII #REF! Jumlah B #REF!

C. REHABILITASI 2 (DUA) RUANG KELAS I. PEKERJAAN PERSIAPAN

1 Pek. Bongkaran 1.00 ls 1,000,000.00 1,000,000.00 Jumlah I 1,000,000.00

II. PEKERJAAN TANAH DAN URUGAN 1 Pek. Galian tanah pondasi teras 1.47 m3 38,980.00 57,300.60 2 Pek. Urugan tanah kembali 0.87 m3 12,990.00 11,301.30 3 Pek. Urugan pasir dibawah pondasi teras 0.06 m3 147,590.00 8,855.40

Jumlah II 77,457.30

Page 14: RAB PAGAR.xls

1 2 3 4 5

III. PEKERJAAN PONDASI DAN BETON

1 Pas. Pondasi batu kali ad. 1:5 teras 0.54 m3 #REF! #REF!

2 Pek. Kolom teras 15/20 beton Site Mix K.175 0.30 m3 #REF! #REF!

3 Pek. Balok teras 15/20 beton Site Mix K.175 0.66 m3 #REF! #REF!

4 Pek. Balok diatas folding gate 15/20 beton Site Mix K.175 0.21 m3 #REF! #REF!

5 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 1.47 m3 #REF! #REF!

Jumlah III #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN

1 Pek. Dinding bata ad. 1:5 44.10 m2 89,590.00 3,950,919.00

2 Pek. Plesteran dinding ad. 1:5 + acian 171.32 m2 46,330.00 7,937,070.28

3 Pek. Plesteran beton ad 1:3 + acian 19.10 m2 #REF! #REF!

4 Pek. Dinding dan kolom teras keramik 20/25 19.92 m2 26,260.00 523,099.20

Jumlah IV #REF!

V. PEKERJAAN LANTAI

1 Perbaikan Lantai keramik 30x30 cm setara KW II 25.20 m2 #REF! #REF!

Jumlah V #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA 1 Pek. Kusen pintu P1 2.00 bh #REF! #REF!2 Pek. Kusen jendela J1 8.00 bh #REF! #REF!

3 Pek. Kusen bouvenlight BV1 2.00 bh #REF! #REF!

4 Pek. Partisi Folding gate 17.42 m2 500,000.00 8,710,000.00

Jumlah VI #REF!

VII. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 194.00 m2 #REF! #REF!

2 Pek. Genteng metal lapis pasir 194.00 m2 #REF! #REF!

3 Pek. Nok genteng metal lapis pasir 16.00 m' #REF! #REF!

4 Pek. Flashing listplank metal lapis pasir 24.00 m' #REF! #REF!

5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 171.50 m2 5,565,210.00 954,433,515.00

6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 56.50 m' #REF! #REF!

7 Pek. List plafond profil kayu 193.30 m' #REF! #REF!

Jumlah VII #REF!

VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 309.41 m2 53,710.00 16,618,411.10

2 Pek. Pengecatan plafond sek. Decoplus 171.50 m2 143,920.00 24,682,280.00

3 Pek. Pengecatan listplank sek. Glotex 16.95 m2 122,770.00 2,080,951.50

4 Pek. Pengecatan kusen pintu/jendela sek. Glotex 67.25 m2 122,770.00 8,256,282.50

Jumlah VIII 51,637,925.10

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE

1 Pas. Instalasi titik lampu 10.00 titik #REF! #REF!

2 Pas. Instalasi titik stop kontak 2.00 titik #REF! #REF!

3 Pas. Saklar tunggal broco 1.00 bh #REF! #REF!

4 Pas. Saklar ganda broco 2.00 bh #REF! #REF!

5 Pas. Stop kontak broco 2.00 bh #REF! #REF!

6 Pas. Lampu PLC 8 watt philips 10.00 bh #REF! #REF!

7 Pas. Panel MCB 5x10 A 1.00 bh #REF! #REF!

Jumlah IX #REF!

Jumlah C #REF!

Jumlah Total #REF!

Page 15: RAB PAGAR.xls

REKAPITULASI RINCIAN ANGGARAN BIAYA

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Dahu 1 Kecamatan CikedalLokasi : Kecamatan Cikedal Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN JUMLAH (Rp.)

A. REHABILITASI 2 (DUA) RUANG KELAS + RUANG GURU

I. PEKERJAAN PERSIAPAN 3,615,680.00

II. PEKERJAAN TANAH DAN URUGAN 991,564.11

III. PEKERJAAN PONDASI DAN BETON #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN #REF!

V. PEKERJAAN LANTAI #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA #REF!

VII. PEKERJAAN ATAP DAN PLAFOND #REF!

VIII. PEKERJAAN PENGECATAN 70,999,829.20

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE #REF!

B. REHABILITASI 3 (TIGA) RUANG KELAS

I. PEKERJAAN PERSIAPAN 1,500,000.00

II. PEKERJAAN TANAH DAN URUGAN 116,445.80

III. PEKERJAAN PONDASI DAN BETON #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN #REF!

V. PEKERJAAN LANTAI #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA #REF!

VII. PEKERJAAN ATAP DAN PLAFOND #REF!

VIII. PEKERJAAN PENGECATAN 73,750,288.50

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE #REF!

REAL COST #REF!

PPN 10% #REF!

JUMLAH TOTAL #REF!

DIBULATKAN #REF!

Terbilang : " Empat Ratus Empat Puluh Satu Juta Rupiah "

Pandeglang, Juni 2012

Konsultan PerencanaPT. SAKHA MULTITAMA

TB. EKA NUGRAHA, K.E.R, S.KomDirektur

Page 16: RAB PAGAR.xls

RINCIAN ANGGARAN BIAYA (RAB)

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Dahu 1 Kecamatan CikedalLokasi : Kecamatan Cikedal Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN VOLUME

1 2 3 4 5A. REHABILITASI 2 (DUA) RUANG KELAS + RUANG GURU I. PEKERJAAN PERSIAPAN

1 Pek. Papan nama proyek 1.00 bh 365,680.00 365,680.00 2 Pek. Bongkaran 1.00 ls 1,500,000.00 1,500,000.00 3 Biaya Dokumentasi dan Pelaporan 1.00 ls 1,750,000.00 1,750,000.00

Jumlah I 3,615,680.00 II. PEKERJAAN TANAH DAN URUGAN

1 Pek. Galian tanah pondasi teras 3.31 m3 38,980.00 128,926.35 2 Pek. Urugan tanah kembali 1.96 m3 12,990.00 25,463.00 3 Pek. Urugan pasir dibawah pondasi teras 0.13 m3 147,590.00 19,526.16 4 Pek. Urugan pasir dibawah lantai 5.54 m3 147,590.00 817,648.60

Jumlah II 991,564.11 III. PEKERJAAN PONDASI DAN BETON

1 Pas. Pondasi batu kali ad. 1:5 teras 1.22 m3 #REF! #REF!2 Pas. Rollag batu bata ad. 1:5 teras 1.41 m3 597,565.30 842,567.07 3 Pek. Sloof 15/20 beton Site Mix K.175 teras 0.85 m3 #REF! #REF!4 Pek. Kolom struktur 15/20 beton Site Mix K.175 1.89 m3 #REF! #REF!5 Pek. Kolom teras 15/20 beton Site Mix K.175 0.68 m3 #REF! #REF!6 Pek. Kolom praktis 12/12 beton Site Mix K.175 0.20 m3 #REF! #REF!7 Pek. Balok teras 15/20 beton Site Mix K.175 0.93 m3 #REF! #REF!8 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 1.97 m3 #REF! #REF!9 Pek. Saluran air hujan L=20 cm 40.60 m' 188,470.00 7,651,882.00

10 Pek. Rabat beton tumbuk ad. 1:3:5 2.76 m3 373,360.00 1,030,473.60 Jumlah III #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN 1 Pek. Dinding bata ad. 1:5 203.75 m2 89,590.00 18,253,962.50 2 Pek. Plesteran dinding ad. 1:5 + acian 378.70 m2 46,330.00 17,545,171.00 3 Pek. Plesteran beton ad 1:3 + acian 48.67 m2 #REF! #REF!4 Pek. Dinding dan kolom teras keramik 20/25 28.80 m2 26,260.00 756,288.00

Jumlah IV #REF!V. PEKERJAAN LANTAI

1 Pek. Lantai keramik 30x30 cm setara KW II 178.57 m2 #REF! #REF! Jumlah V #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA 1 Pek. Kusen pintu P1 3.00 bh #REF! #REF!2 Pek. Kusen jendela J1 11.00 bh #REF! #REF!3 Pek. Kusen bouvenlight BV1 2.00 bh #REF! #REF!

Jumlah VI #REF!VII. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 276.18 m2 #REF! #REF!2 Pek. Genteng metal lapis pasir 276.18 m2 #REF! #REF!3 Pek. Nok genteng metal lapis pasir 23.00 m' #REF! #REF!4 Pek. Flashing listplank metal lapis pasir 24.00 m' #REF! #REF!5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 240.00 m2 5,565,210.00 1,335,650,400.00 6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 70.50 m' #REF! #REF!7 Pek. List plafond profil kayu 266.90 m' #REF! #REF!

Jumlah VII #REF!VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 427.25 m2 53,710.00 22,947,597.50 2 Pek. Pengecatan plafond sek. Decoplus 239.97 m2 143,920.00 34,536,482.40 3 Pek. Pengecatan listplank sek. Glotex 21.15 m2 122,770.00 2,596,585.50 4 Pek. Pengecatan kusen pintu/jendela sek. Glotex 88.94 m2 122,770.00 10,919,163.80

Jumlah VIII 70,999,829.20

HARGA SATUAN(Rp.)

J U M L A H(Rp.)

Page 17: RAB PAGAR.xls

1 2 3 4 5IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE

1 Pas. Instalasi titik lampu 15.00 titik #REF! #REF!2 Pas. Instalasi titik stop kontak 3.00 titik #REF! #REF!3 Pas. Saklar tunggal broco 1.00 bh #REF! #REF!4 Pas. Saklar ganda broco 3.00 bh #REF! #REF!5 Pas. Stop kontak broco 3.00 bh #REF! #REF!6 Pas. Lampu PLC 8 watt philips 15.00 bh #REF! #REF!7 Pas. Panel MCB 5x10 A 1.00 bh #REF! #REF!

Jumlah IX #REF! Jumlah A #REF!

B. REHABILITASI 3 (TIGA) RUANG KELAS

I. PEKERJAAN PERSIAPAN

1 Pek. Bongkaran 1.00 ls 1,500,000.00 1,500,000.00

Jumlah I 1,500,000.00

II. PEKERJAAN TANAH DAN URUGAN

1 Pek. Galian tanah pondasi teras 2.21 m3 38,980.00 86,145.80

2 Pek. Urugan tanah kembali 1.31 m3 12,990.00 17,016.90

3 Pek. Urugan pasir dibawah pondasi teras 0.09 m3 147,590.00 13,283.10

Jumlah II 116,445.80

III. PEKERJAAN PONDASI DAN BETON

1 Pas. Pondasi batu kali ad. 1:5 teras 0.81 m3 #REF! #REF!

2 Pek. Kolom struktur 15/20 beton Site Mix K.175 2.10 m3 #REF! #REF!

3 Pek. Kolom teras 15/20 beton Site Mix K.175 0.45 m3 #REF! #REF!

4 Pek. Balok teras 15/20 beton Site Mix K.175 1.02 m3 #REF! #REF!

5 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 2.12 m3 #REF! #REF!6 Pek. Rabat beton tumbuk ad. 1:3:5 2.08 m3 373,360.00 776,588.80

Jumlah III #REF!IV. PEKERJAAN DINDING DAN PLESTERAN

1 Pek. Dinding bata ad. 1:5 30.00 m2 89,590.00 2,687,700.00 2 Pek. Plesteran dinding ad. 1:5 + acian 300.92 m2 46,330.00 13,941,808.92 3 Pek. Plesteran beton ad 1:3 + acian 46.70 m2 #REF! #REF!4 Pek. Dinding keramik 20/25 24.96 m2 26,260.00 655,449.60

Jumlah IV #REF!V. PEKERJAAN LANTAI

1 Perbaikan Lantai keramik 30x30 cm setara KW II 53.20 m2 #REF! #REF! Jumlah V #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA 1 Pek. Kusen pintu P1 3.00 m3 #REF! #REF!2 Pek. Kusen jendela J1 12.00 m2 #REF! #REF!3 Pek. Kusen bouvenlight BV1 3.00 m2 #REF! #REF!

Jumlah VI #REF!VII. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 312.20 m2 #REF! #REF!2 Pek. Genteng metal lapis pasir 312.20 m2 #REF! #REF!3 Pek. Nok genteng metal lapis pasir 26.00 m' #REF! #REF!4 Pek. Flashing listplank metal lapis pasir 24.00 m' #REF! #REF!5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 233.30 m2 5,565,210.00 1,298,363,493.00 6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 76.00 m' #REF! #REF!7 Pek. List plafond profil kayu 228.00 m' #REF! #REF!

Jumlah VII #REF!VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 473.84 m2 53,710.00 25,449,946.40 2 Pek. Pengecatan plafond sek. Decoplus 233.30 m2 143,920.00 33,576,536.00 3 Pek. Pengecatan listplank sek. Glotex 22.80 m2 122,770.00 2,799,156.00 4 Pek. Pengecatan kusen pintu/jendela sek. Glotex 97.13 m2 122,770.00 11,924,650.10

Jumlah VIII 73,750,288.50 IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE

1 Pas. Instalasi titik lampu 15.00 titik #REF! #REF!2 Pas. Instalasi titik stop kontak 3.00 titik #REF! #REF!3 Pas. Saklar tunggal broco 1.00 bh #REF! #REF!4 Pas. Saklar ganda broco 3.00 bh #REF! #REF!5 Pas. Stop kontak broco 3.00 bh #REF! #REF!6 Pas. Lampu PLC 8 watt philips 15.00 bh #REF! #REF!7 Pas. Panel MCB 5x10 A 1.00 bh #REF! #REF!

Jumlah IX #REF! Jumlah B #REF!

Jumlah Total #REF!

Page 18: RAB PAGAR.xls

REKAPITULASI RINCIAN ANGGARAN BIAYA

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Dahu 2 Kecamatan CikedalLokasi : Kecamatan Cikedal Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN JUMLAH (Rp.)

A. REHABILITASI 3 (TIGA) RUANG KELAS + RUANG GURU I. PEKERJAAN PERSIAPAN 4,115,680.00 II. PEKERJAAN TANAH DAN URUGAN 451,796.44 III. PEKERJAAN PONDASI DAN BETON #REF! IV. PEKERJAAN DINDING DAN PLESTERAN #REF! V. PEKERJAAN LANTAI #REF! VI. PEKERJAAN KUSEN PINTU DAN JENDELA #REF! VII. PEKERJAAN ATAP DAN PLAFOND #REF! VIII. PEKERJAAN PENGECATAN 91,963,488.15 IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE #REF!

REAL COST #REF! PPN 10% #REF! JUMLAH TOTAL #REF! DIBULATKAN #REF!

Terbilang : " Dua Ratus Sembilan Puluh Empat Juta Rupiah "

Pandeglang, Juni 2012

Konsultan PerencanaPT. SAKHA MULTITAMA

TB. EKA NUGRAHA, K.E.R, S.KomDirektur

Page 19: RAB PAGAR.xls

RINCIAN ANGGARAN BIAYA (RAB)

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Dahu 2 Kecamatan CikedalLokasi : Kecamatan Cikedal Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN VOLUME

1 2 3 4 5A. REHABILITASI 3 (TIGA) RUANG KELAS + RUANG GURU I. PEKERJAAN PERSIAPAN

1 Pek. Papan nama proyek 1.00 bh 365,680.00 365,680.00 2 Pek. Bongkaran 1.00 ls 2,000,000.00 2,000,000.00 3 Biaya Dokumentasi dan Pelaporan 1.00 ls 1,750,000.00 1,750,000.00

Jumlah I 4,115,680.00 II. PEKERJAAN TANAH DAN URUGAN

1 Pek. Galian tanah pondasi teras 4.41 m3 38,980.00 171,901.80 2 Pek. Urugan tanah kembali 2.61 m3 12,990.00 33,950.66 3 Pek. Urugan pasir dibawah pondasi teras 0.18 m3 147,590.00 26,034.88 4 Pek. Urugan pasir dibawah lantai 1.49 m3 147,590.00 219,909.10

Jumlah II 451,796.44 III. PEKERJAAN PONDASI DAN BETON

1 Pas. Pondasi batu kali ad. 1:5 teras 1.62 m3 #REF! #REF!2 Pas. Rollag batu bata ad. 1:5 teras 1.83 m3 597,565.30 1,093,544.50 3 Pek. Sloof 15/20 beton Site Mix K.175 teras 1.10 m3 #REF! #REF!4 Pek. Kolom struktur 15/20 beton Site Mix K.175 2.52 m3 #REF! #REF!5 Pek. Kolom teras 15/20 beton Site Mix K.175 0.90 m3 #REF! #REF!6 Pek. Kolom praktis 12/12 beton Site Mix K.175 0.25 m3 #REF! #REF!7 Pek. Balok teras 15/20 beton Site Mix K.175 1.13 m3 #REF! #REF!8 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 2.47 m3 #REF! #REF!9 Pek. Saluran air hujan L=20 cm 76.60 m' 188,470.00 14,436,802.00

10 Pek. Rabat beton tumbuk ad. 1:3:5 3.28 m3 373,360.00 1,224,620.80 Jumlah III #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN 1 Pek. Dinding bata ad. 1:5 121.88 m2 89,590.00 10,919,677.15 2 Pek. Plesteran dinding ad. 1:5 + acian 482.75 m2 46,330.00 22,365,807.50 3 Pek. Plesteran beton ad 1:3 + acian 62.72 m2 #REF! #REF!4 Pek. Dinding dan kolom teras keramik 20/25 37.80 m2 26,260.00 992,628.00

Jumlah IV #REF!V. PEKERJAAN LANTAI

1 PeK. Lantai keramik 30x30 cm setara KW II 242.00 m2 #REF! #REF! Jumlah V #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA 1 Pek. Kusen pintu P1 4.00 bh #REF! #REF!2 Pek. Kusen jendela J1 15.00 bh #REF! #REF!3 Pek. Kusen bouvenlight BV1 3.00 bh #REF! #REF!

Jumlah VI #REF!VII. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 359.40 m2 #REF! #REF!2 Pek. Genteng metal lapis pasir 359.40 m2 #REF! #REF!3 Pek. Nok genteng metal lapis pasir 29.50 m' #REF! #REF!4 Pek. Flashing listplank metal lapis pasir 24.30 m' #REF! #REF!5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 310.60 m2 5,565,210.00 1,728,554,226.00 6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 83.50 m' #REF! #REF!7 Pek. List plafond profil kayu 336.50 m' #REF! #REF!

Jumlah VII #REF!VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 545.37 m2 53,710.00 29,292,091.25 2 Pek. Pengecatan plafond sek. Decoplus 310.60 m2 143,920.00 44,701,552.00 3 Pek. Pengecatan listplank sek. Glotex 25.05 m2 122,770.00 3,075,388.50 4 Pek. Pengecatan kusen pintu/jendela sek. Glotex 121.32 m2 122,770.00 14,894,456.40

Jumlah VIII 91,963,488.15 IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE

1 Pas. Instalasi titik lampu 20.00 titik #REF! #REF!2 Pas. Instalasi titik stop kontak 4.00 titik #REF! #REF!3 Pas. Saklar tunggal broco 1.00 bh #REF! #REF!4 Pas. Saklar ganda broco 4.00 bh #REF! #REF!5 Pas. Stop kontak broco 4.00 bh #REF! #REF!6 Pas. Lampu PLC 8 watt philips 20.00 bh #REF! #REF!7 Pas. Panel MCB 5x10 A 1.00 bh #REF! #REF!

Jumlah IX #REF! Jumlah Total #REF!

HARGA SATUAN(Rp.)

J U M L A H(Rp.)

Page 20: RAB PAGAR.xls

REKAPITULASI RINCIAN ANGGARAN BIAYA

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Karyasari 3 Kecamatan CikedalLokasi : Kecamatan Cikedal Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN JUMLAH (Rp.)

A. REHABILITASI 2 (DUA) R. KELAS DAN RUANG KOMPUTER

I. PEKERJAAN PERSIAPAN 3,115,680.00

II. PEKERJAAN TANAH DAN URUGAN 154,591.56

III. PEKERJAAN PONDASI DAN BETON #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN #REF!

V. PEKERJAAN LANTAI #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA #REF!

VII. PEKERJAAN ATAP DAN PLAFOND #REF!

VIII. PEKERJAAN PENGECATAN 59,795,094.00

B. REHABILITASI 1 (SATU) RUANG KELAS

I. PEKERJAAN PERSIAPAN 500,000.00

II. PEKERJAAN PONDASI DAN BETON #REF!

III. PEKERJAAN DINDING DAN PLESTERAN #REF!

IV. PEKERJAAN LANTAI #REF!

V. PEKERJAAN KUSEN PINTU DAN JENDELA #REF!

VI. PEKERJAAN ATAP DAN PLAFOND #REF!

VII. PEKERJAAN PENGECATAN 32,279,921.70

REAL COST #REF!

PPN 10% #REF!

JUMLAH TOTAL #REF!

DIBULATKAN #REF!

Terbilang : " Dua Ratus Dua Puluh Juta Lima Ratus Ribu Rupiah "

Pandeglang, Juni 2012

Konsultan PerencanaPT. SAKHA MULTITAMA

TB. EKA NUGRAHA, K.E.R, S.KomDirektur

Page 21: RAB PAGAR.xls

RINCIAN ANGGARAN BIAYA (RAB)

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Karyasari 3 Kecamatan CikedalLokasi : Kecamatan Cikedal Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN VOLUME

1 2 3 4 5

A. REHABILITASI 2 (DUA) R. KELAS DAN RUANG KOMPUTER

I. PEKERJAAN PERSIAPAN

1 Pek. Papan nama proyek 1.00 bh 365,680.00 365,680.00

2 Pek. Bongkaran 1.00 ls 1,000,000.00 1,000,000.00

3 Biaya Dokumentasi dan Pelaporan 1.00 ls 1,750,000.00 1,750,000.00

Jumlah I 3,115,680.00

II. PEKERJAAN TANAH DAN URUGAN

1 Pek. Galian tanah pondasi teras 2.94 m3 38,980.00 114,601.20

2 Pek. Urugan tanah kembali 1.74 m3 12,990.00 22,633.78

3 Pek. Urugan pasir dibawah pondasi teras 0.12 m3 147,590.00 17,356.58

Jumlah II 154,591.56

III. PEKERJAAN PONDASI DAN BETON

1 Pas. Pondasi batu kali ad. 1:5 teras 1.08 m3 #REF! #REF!

2 Pek. Kolom teras 15/20 beton Site Mix K.175 0.60 m3 #REF! #REF!

3 Pek. Balok teras 15/20 beton Site Mix K.175 0.78 m3 #REF! #REF!

4 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 1.56 m3 #REF! #REF!

Jumlah III #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN

1 Pek. Dinding bata ad. 1:5 30.86 m2 89,590.00 2,764,747.40

2 Pek. Plesteran dinding ad. 1:5 + acian 101.62 m2 46,330.00 4,708,054.60

3 Pek. Plesteran beton ad 1:3 + acian 28.30 m2 #REF! #REF!

4 Pek. Dinding dan kolom teras keramik 20/25 23.64 m2 26,260.00 620,786.40

Jumlah IV #REF!

V. PEKERJAAN LANTAI

1 Perbaikan Lantai keramik 30x30 cm setara KW II 34.40 m2 #REF! #REF!

Jumlah V #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pek. Kusen pintu P1 2.00 bh #REF! #REF!

2 Pek. Kusen pintu P2 1.00 bh #REF! #REF!

3 Pek. Kusen jendela J1 8.00 bh #REF! #REF!

4 Pek. Kusen bouvenlight BV1 2.00 bh #REF! #REF!

Jumlah VI #REF!

VII. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 228.15 m2 #REF! #REF!

2 Pek. Genteng metal lapis pasir 228.15 m2 #REF! #REF!

3 Pek. Nok genteng metal lapis pasir 19.00 m' #REF! #REF!

4 Pek. Flashing listplank metal lapis pasir 12.00 m' #REF! #REF!

5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 197.27 m2 5,565,210.00 1,097,848,976.70 6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 50.25 m' #REF! #REF!7 Pek. List plafond profil kayu 202.25 m' #REF! #REF!

Jumlah VII #REF!

VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 386.06 m2 53,710.00 20,735,282.60

2 Pek. Pengecatan plafond sek. Decoplus 197.27 m2 143,920.00 28,391,098.40

3 Pek. Pengecatan listplank sek. Glotex 15.08 m2 122,770.00 1,851,371.60

4 Pek. Pengecatan kusen pintu/jendela sek. Glotex 71.82 m2 122,770.00 8,817,341.40

Jumlah VIII 59,795,094.00

Jumlah A #REF!

HARGA SATUAN(Rp.)

J U M L A H(Rp.)

Page 22: RAB PAGAR.xls

1 2 3 4 5

B. REHABILITASI 1 (SATU) RUANG KELAS

I. PEKERJAAN PERSIAPAN

1 Pek. Bongkaran 1.00 ls 500,000.00 500,000.00

Jumlah I 500,000.00

II. PEKERJAAN PONDASI DAN BETON

1 Pek. Kolom struktur 15/20 beton Site Mix K.175 0.84 m3 #REF! #REF!

2 Pek. Kolom praktis 12/12 beton Site Mix K.175 0.10 m3 #REF! #REF!

3 Pek. Balok teras 15/20 beton Site Mix K.175 0.42 m3 #REF! #REF!

4 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 1.01 m3 #REF! #REF!

Jumlah II #REF!

III. PEKERJAAN DINDING DAN PLESTERAN

1 Pek. Dinding bata ad. 1:5 24.10 m2 89,590.00 2,159,119.00

2 Pek. Plesteran dinding ad. 1:5 + acian 68.20 m2 46,330.00 3,159,706.00

3 Pek. Plesteran beton ad 1:3 + acian 21.70 m2 #REF! #REF!

4 Pek. Dinding dan kolom teras keramik 20/25 11.64 m2 26,260.00 305,666.40

Jumlah III #REF!

IV. PEKERJAAN LANTAI

1 Perbaikan Lantai keramik 30x30 cm setara KW II 20.40 m2 #REF! #REF!

Jumlah IV #REF!

V. PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pek. Kusen pintu P1 1.00 m3 #REF! #REF!

2 Pek. Kusen jendela J1 4.00 m2 #REF! #REF!

3 Pek. Kusen bouvenlight BV1 1.00 m2 #REF! #REF!

Jumlah V #REF!

VI. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 120.00 m2 #REF! #REF!

2 Pek. Genteng metal lapis pasir 120.00 m2 #REF! #REF!

3 Pek. Nok genteng metal lapis pasir 10.00 m' #REF! #REF!

4 Pek. Flashing listplank metal lapis pasir 24.00 m' #REF! #REF!

5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 107.00 m2 5,565,210.00 595,477,470.00

6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 44.50 m' #REF! #REF!

7 Pek. List plafond profil kayu 127.70 m' #REF! #REF!

Jumlah VI #REF!

VII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 209.76 m2 53,710.00 11,266,209.60

2 Pek. Pengecatan plafond sek. Decoplus 107.00 m2 143,920.00 15,399,440.00

3 Pek. Pengecatan listplank sek. Glotex 13.35 m2 122,770.00 1,638,979.50

4 Pek. Pengecatan kusen pintu/jendela sek. Glotex 32.38 m2 122,770.00 3,975,292.60

Jumlah VII 32,279,921.70

Jumlah B #REF!

Jumlah Total #REF!

Page 23: RAB PAGAR.xls

REKAPITULASI RINCIAN ANGGARAN BIAYA

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Karyautama 1 Kecamatan CikedalLokasi : Kecamatan Cikedal Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN JUMLAH (Rp.)

A. REHABILITASI 6 (ENAM) RUANG KELAS + WC

I. PEKERJAAN PERSIAPAN 5,115,680.00

II. PEKERJAAN TANAH DAN URUGAN 1,668,070.30

III. PEKERJAAN PONDASI DAN BETON #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN 22,480,592.25

V. PEKERJAAN LANTAI #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA #REF!

VII. PEKERJAAN ATAP DAN PLAFOND #REF!

VIII. PEKERJAAN PENGECATAN 154,512,521.80

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE #REF!

X. PEKERJAAN SANITASI #REF!

REAL COST #REF!

PPN 10% #REF!

JUMLAH TOTAL #REF!

DIBULATKAN #REF!

Terbilang : " Tiga Ratus Delapan Puluh Dua Juta Rupiah "

Pandeglang, Juni 2012

Konsultan PerencanaPT. SAKHA MULTITAMA

TB. EKA NUGRAHA, K.E.R, S.KomDirektur

Page 24: RAB PAGAR.xls

RINCIAN ANGGARAN BIAYA (RAB)

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Karyautama 1 Kecamatan CikedalLokasi : Kecamatan Cikedal Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN VOLUME

1 2 3 4 5A. REHABILITASI 6 (ENAM) RUANG KELAS + WC I. PEKERJAAN PERSIAPAN

1 Pek. Papan nama proyek 1.00 bh 365,680.00 365,680.00 2 Pek. Bongkaran 1.00 ls 3,000,000.00 3,000,000.00 3 Biaya Dokumentasi dan Pelaporan 1.00 ls 1,750,000.00 1,750,000.00

Jumlah I 5,115,680.00 II. PEKERJAAN TANAH DAN URUGAN

1 Pek. Galian tanah pondasi 15.82 m3 38,980.00 616,663.60

2 Pek. Urugan tanah kembali 5.27 m3 12,990.00 68,457.30

3 Pek. Urugan pasir dibawah pondasi 0.99 m3 147,590.00 146,114.10

4 Pek. Urugan pasir dibawah lantai 5.67 m3 147,590.00 836,835.30

Jumlah II 1,668,070.30

III. PEKERJAAN PONDASI DAN BETON

1 Pas. Pondasi batu kali ad. 1:5 9.89 m3 #REF! #REF!

2 Pas. Rollag batu bata ad. 1:5 0.24 m3 597,565.30 143,415.67

3 Pek. Sloof 15/20 beton Site Mix K.175 0.79 m3 #REF! #REF!

4 Pek. Kolom struktur 15/20 beton Site Mix K.175 0.42 m3 #REF! #REF!

5 Pek. Kolom teras 15/20 beton Site Mix K.175 0.15 m3 #REF! #REF!

6 Pek. Kolom praktis 12/12 beton Site Mix K.175 0.40 m3 #REF! #REF!

7 Pek. Balok teras 15/20 beton Site Mix K.175 0.26 m3 #REF! #REF!

8 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 1.03 m3 #REF! #REF!

9 Pek. Balok lintel 10/12 beton Site Mix K.175 1.32 m3 #REF! #REF!

10 Pek. Rabat beton tumbuk ad. 1:3:5 2.76 m3 373,360.00 1,030,473.60

Jumlah III #REF!IV. PEKERJAAN DINDING DAN PLESTERAN

1 Pek. Dinding bata ad. 1:5 112.02 m2 89,590.00 10,036,319.75 2 Pek. Plesteran dinding ad. 1:5 + acian 224.05 m2 46,330.00 10,380,236.50 3 Pek. Dinding dan kolom teras keramik 20/25 55.80 m2 26,260.00 1,465,308.00 4 Pek. Dinding keramik 20/25 km 22.80 m2 26,260.00 598,728.00

Jumlah III 22,480,592.25 V. PEKERJAAN LANTAI

1 Pek. Lantai keramik anti slip 20x20 cm setara KW II 10.24 m2 4,209,310.00 43,103,334.40 2 Perbaikan Lantai keramik 30x30 cm setara KW II 100.70 m2 #REF! #REF!

Jumlah V #REF!VI. PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pek. Kusen pintu P1 6.00 bh #REF! #REF!2 Pek. Kusen pintu P2 1.00 bh #REF! #REF!3 Pek. Kusen jendela J1 23.00 bh #REF! #REF!4 Pek. Kusen bouvenlight BV1 5.00 bh #REF! #REF!5 Pek. Kusen bouvenlight BV3 4.00 bh #REF! #REF!6 Pek. Pintu PVC 4.00 bh 236,500.00 946,000.00 7 Pek. Folding gate 17.80 m2 500,000.00 8,900,000.00

Jumlah VI #REF!VII. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 587.58 m2 #REF! #REF!2 Pek. Genteng metal lapis pasir 587.58 m2 #REF! #REF!3 Pek. Nok genteng metal lapis pasir 69.30 m' #REF! #REF!4 Pek. Flashing listplank metal lapis pasir 24.60 m' #REF! #REF!5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 508.90 m2 5,565,210.00 2,832,135,369.00 6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 117.40 m' #REF! #REF!7 Pek. List plafond profil kayu 507.40 m' #REF! #REF!8 Pek. Talang miring seng BJLS 28 22.20 m' #REF! #REF!

Jumlah VII #REF!

HARGA SATUAN(Rp.)

J U M L A H(Rp.)

Page 25: RAB PAGAR.xls

1 2 3 4 5VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 918.69 m2 53,710.00 49,342,839.90 2 Pek. Pengecatan plafond sek. Decoplus 508.90 m2 143,920.00 73,240,888.00 3 Pek. Pengecatan listplank sek. Glotex 35.22 m2 122,770.00 4,323,959.40 4 Pek. Pengecatan kusen pintu/jendela sek. Glotex 224.85 m2 122,770.00 27,604,834.50

Jumlah VIII 154,512,521.80 IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE

1 Pas. Instalasi titik lampu 30.00 titik #REF! #REF!2 Pas. Instalasi titik stop kontak 7.00 titik #REF! #REF!3 Pas. Saklar tunggal broco 2.00 bh #REF! #REF!4 Pas. Saklar ganda broco 6.00 bh #REF! #REF!5 Pas. Stop kontak broco 7.00 bh #REF! #REF!6 Pas. Lampu PLC 8 watt philips 30.00 bh #REF! #REF!7 Pas. Panel MCB 5x10 A 1.00 bh #REF! #REF!

Jumlah IX #REF!X. PEKERJAAN SANITASI

1 Pas. Kloset jongkok 4.00 bh 899,150.00 3,596,600.00 2 Pas. Kran air dia 1/2" 4.00 bh 30,010.00 120,040.00 3 Pas. Floor drain 4.00 bh 411,840.00 1,647,360.00 4 Pas. Pipa PVC dia. 1/2" 12.00 m' 964,250.00 11,571,000.00 5 Pas. Pipa PVC dia. 3" 12.00 m' #REF! #REF!6 Pas. Pipa PVC dia. 4" 12.00 bh 33,170.00 398,040.00 7 Pek. Septictank dan rembesan 1.00 bh 29,210.00 29,210.00

Jumlah X #REF! Jumlah Total #REF!

Page 26: RAB PAGAR.xls

REKAPITULASI RINCIAN ANGGARAN BIAYA

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Karyautama 2 Kecamatan CikedalLokasi : Kecamatan Cikedal Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN JUMLAH (Rp.)

A. REHABILITASI 3 (TIGA) R. KELAS

I. PEKERJAAN PERSIAPAN 3,615,680.00

II. PEKERJAAN TANAH DAN URUGAN 373,299.25

III. PEKERJAAN PONDASI DAN BETON #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN #REF!

V. PEKERJAAN LANTAI #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA #REF!

VII. PEKERJAAN ATAP DAN PLAFOND #REF!

VIII. PEKERJAAN PENGECATAN 76,700,281.85

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE #REF!

B. REHABILITASI RUANG KEPALA SEKOLAH

I. PEKERJAAN PERSIAPAN 500,000.00

II. PEKERJAAN TANAH DAN URUGAN 107,405.70

III. PEKERJAAN PONDASI DAN BETON #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN #REF!

V. PEKERJAAN LANTAI #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA #REF!

VII. PEKERJAAN ATAP DAN PLAFOND #REF!

VIII. PEKERJAAN PENGECATAN 28,411,895.63

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE #REF!

REAL COST #REF!

PPN 10% #REF!

JUMLAH TOTAL #REF!

DIBULATKAN #REF!

Terbilang : " Dua Ratus Sembilan Puluh Empat Juta Rupiah "

Pandeglang, Juni 2012

Konsultan PerencanaPT. SAKHA MULTITAMA

TB. EKA NUGRAHA, K.E.R, S.KomDirektur

Page 27: RAB PAGAR.xls

RINCIAN ANGGARAN BIAYA (RAB)

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Karyautama 2 Kecamatan CikedalLokasi : Kecamatan Cikedal Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN VOLUME

1 2 3 4 5A. REHABILITASI 3 (TIGA) R. KELAS I. PEKERJAAN PERSIAPAN

1 Pek. Papan nama proyek 1.00 bh 365,680.00 365,680.00 2 Pek. Bongkaran 1.00 ls 1,500,000.00 1,500,000.00 3 Biaya Dokumentasi dan Pelaporan 1.00 ls 1,750,000.00 1,750,000.00

Jumlah I 3,615,680.00 II. PEKERJAAN TANAH DAN URUGAN

1 Pek. Galian tanah pondasi teras 3.68 m3 38,980.00 143,251.50 2 Pek. Urugan tanah kembali 2.18 m3 12,990.00 28,292.22 3 Pek. Urugan pasir dibawah pondasi teras 0.15 m3 147,590.00 21,695.73 4 Pek. Urugan pasir dibawah lantai 1.22 m3 147,590.00 180,059.80

Jumlah II 373,299.25 III. PEKERJAAN PONDASI DAN BETON

1 Pas. Pondasi batu kali ad. 1:5 teras 1.35 m3 #REF! #REF!2 Pek. Kolom struktur 15/20 beton Site Mix K.175 2.10 m3 #REF! #REF!3 Pek. Kolom teras 15/20 beton Site Mix K.175 0.75 m3 #REF! #REF!4 Pek. Kolom praktis 12/12 beton Site Mix K.175 0.20 m3 #REF! #REF!5 Pek. Balok teras 15/20 beton Site Mix K.175 0.98 m3 #REF! #REF!6 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 2.12 m3 #REF! #REF!7 Pek. Pasangan bata pondasi rabat ad. 1:5 27.92 m2 89,590.00 2,501,352.80 8 Pek. Rabat beton tumbuk ad. 1:3:5 2.84 m3 373,360.00 1,060,342.40

Jumlah III #REF!IV. PEKERJAAN DINDING DAN PLESTERAN

1 Pek. Dinding bata ad. 1:5 75.60 m2 89,590.00 6,773,004.00 2 Pek. Plesteran dinding ad. 1:5 + acian 223.83 m2 46,330.00 10,370,043.90 3 Pek. Plesteran beton ad 1:3 + acian 52.97 m2 #REF! #REF!4 Pek. Dinding dan kolom teras keramik 20/25 31.20 m2 26,260.00 819,312.00

Jumlah IV #REF!V. PEKERJAAN LANTAI

1 Perbaikan Lantai keramik 30x30 cm setara KW II 78.50 m2 #REF! #REF! Jumlah V #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA 1 Pek. Kusen pintu P1 3.00 bh #REF! #REF!2 Pek. Kusen jendela J1 12.00 bh #REF! #REF!3 Pek. Kusen bouvenlight BV1 3.00 bh #REF! #REF!

Jumlah VI #REF!VII. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 301.26 m2 #REF! #REF!2 Pek. Genteng metal lapis pasir 301.26 m2 #REF! #REF!3 Pek. Nok genteng metal lapis pasir 24.50 m' #REF! #REF!4 Pek. Flashing listplank metal lapis pasir 24.60 m' #REF! #REF!5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 262.00 m2 5,565,210.00 1,458,085,020.00 6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 73.50 m' #REF! #REF!7 Pek. List plafond profil kayu 278.90 m' #REF! #REF!

Jumlah VII #REF!VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 453.57 m2 53,710.00 24,361,513.25 2 Pek. Pengecatan plafond sek. Decoplus 262.00 m2 143,920.00 37,707,040.00 3 Pek. Pengecatan listplank sek. Glotex 22.05 m2 122,770.00 2,707,078.50 4 Pek. Pengecatan kusen pintu/jendela sek. Glotex 97.13 m2 122,770.00 11,924,650.10

Jumlah VIII 76,700,281.85 IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE

1 Pas. Instalasi titik lampu 15.00 titik #REF! #REF!2 Pas. Instalasi titik stop kontak 3.00 titik #REF! #REF!3 Pas. Saklar tunggal broco 2.00 bh #REF! #REF!4 Pas. Saklar ganda broco 2.00 bh #REF! #REF!5 Pas. Stop kontak broco 3.00 bh #REF! #REF!6 Pas. Lampu PLC 8 watt philips 15.00 bh #REF! #REF!7 Pas. Panel MCB 5x10 A 1.00 bh #REF! #REF!

Jumlah IX #REF! Jumlah A #REF!

HARGA SATUAN(Rp.)

J U M L A H(Rp.)

Page 28: RAB PAGAR.xls

1 2 3 4 5B. REHABILITASI RUANG KEPALA SEKOLAH I. PEKERJAAN PERSIAPAN

1 Pek. Bongkaran 1.00 ls 500,000.00 500,000.00 Jumlah I 500,000.00

II. PEKERJAAN TANAH DAN URUGAN 1 Pek. Galian tanah pondasi teras 1.10 m3 38,980.00 42,878.00 2 Pek. Urugan tanah kembali 0.65 m3 12,990.00 8,443.50 3 Pek. Urugan pasir dibawah pondasi teras 0.04 m3 147,590.00 5,903.60 4 Pek. Urugan pasir dibawah lantai 0.34 m3 147,590.00 50,180.60

Jumlah II 107,405.70 III. PEKERJAAN PONDASI DAN BETON

1 Pas. Pondasi batu kali ad. 1:5 teras 0.41 m3 #REF! #REF!2 Pas. Rollag batu bata ad. 1:5 teras 0.49 m3 597,565.30 292,807.00 3 Pek. Sloof 15/20 beton Site Mix K.175 teras 0.30 m3 3,185,300.00 955,590.00 4 Pek. Kolom struktur 15/20 beton Site Mix K.175 0.63 m3 #REF! #REF!5 Pek. Kolom teras 15/20 beton Site Mix K.175 0.23 m3 #REF! #REF!6 Pek. Kolom praktis 12/12 beton Site Mix K.175 0.10 m3 #REF! #REF!7 Pek. Balok teras 15/20 beton Site Mix K.175 0.37 m3 #REF! #REF!8 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 0.95 m3 #REF! #REF!9 Pek. Pasangan bata pondasi rabat ad. 1:5 15.64 m2 89,590.00 1,401,187.60

10 Pek. Rabat beton tumbuk ad. 1:3:5 1.59 m3 373,360.00 593,642.40 Jumlah III #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN 1 Pek. Dinding bata ad. 1:5 22.35 m2 89,590.00 2,002,336.50 2 Pek. Plesteran dinding ad. 1:5 + acian 64.70 m2 46,330.00 2,997,551.00 3 Pek. Plesteran beton ad 1:3 + acian 17.24 m2 #REF! #REF!4 Pek. Dinding dan kolom teras keramik 20/25 8.58 m2 26,260.00 225,310.80

Jumlah IV #REF!V. PEKERJAAN LANTAI

1 Perbaikan Lantai keramik 30x30 cm setara KW II 11.25 m2 #REF! #REF! Jumlah V #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA 1 Pek. Kusen pintu P1 1.00 bh #REF! #REF!2 Pek. Kusen jendela J1 4.00 bh #REF! #REF!3 Pek. Kusen bouvenlight BV1 1.00 bh #REF! #REF!

Jumlah VI #REF!VII. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 103.80 m2 #REF! #REF!2 Pek. Genteng metal lapis pasir 103.80 m2 #REF! #REF!3 Pek. Nok genteng metal lapis pasir 8.25 m' #REF! #REF!4 Pek. Flashing listplank metal lapis pasir 25.10 m' #REF! #REF!5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 92.00 m2 5,565,210.00 511,999,320.00 6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 41.00 m' #REF! #REF!7 Pek. List plafond profil kayu 115.70 m' #REF! #REF!

Jumlah VII #REF!VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 199.06 m2 53,710.00 10,691,378.33 2 Pek. Pengecatan plafond sek. Decoplus 92.00 m2 143,920.00 13,240,640.00 3 Pek. Pengecatan listplank sek. Glotex 12.30 m2 122,770.00 1,510,071.00 4 Pek. Pengecatan kusen pintu/jendela sek. Glotex 24.19 m2 122,770.00 2,969,806.30

Jumlah VIII 28,411,895.63 IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE

1 Pas. Instalasi titik lampu 5.00 titik #REF! #REF!2 Pas. Instalasi titik stop kontak 1.00 titik #REF! #REF!3 Pas. Saklar tunggal broco 1.00 bh #REF! #REF!4 Pas. Saklar ganda broco 1.00 bh #REF! #REF!5 Pas. Stop kontak broco 1.00 bh #REF! #REF!6 Pas. Lampu PLC 8 watt philips 5.00 bh #REF! #REF!7 Pas. Panel MCB 5x10 A 1.00 bh #REF! #REF!

Jumlah IX #REF! Jumlah B #REF!

Jumlah Total #REF!

Page 29: RAB PAGAR.xls

REKAPITULASI RINCIAN ANGGARAN BIAYA

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Tegal 1 Kecamatan CikedalLokasi : Kecamatan Cikedal Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN JUMLAH (Rp.)

A. REHABILITASI 2 (DUA) RUANG KELAS

I. PEKERJAAN PERSIAPAN 3,115,680.00

II. PEKERJAAN TANAH DAN URUGAN 199,246.50

III. PEKERJAAN BETON #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN #REF!

V. PEKERJAAN LANTAI #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA #REF!

VII. PEKERJAAN ATAP DAN PLAFOND #REF!

VIII. PEKERJAAN PENGECATAN 55,206,556.10

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE #REF!

REAL COST #REF!

PPN 10% #REF!

JUMLAH TOTAL #REF!

DIBULATKAN #REF!

Terbilang : " Seratus Empat Puluh Tujuh Juta Rupiah "

Pandeglang, Juni 2012

Konsultan PerencanaPT. SAKHA MULTITAMA

TB. EKA NUGRAHA, K.E.R, S.KomDirektur

Page 30: RAB PAGAR.xls

RINCIAN ANGGARAN BIAYA (RAB)

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi Gedung SDN Tegal 1 Kecamatan CikedalLokasi : Kecamatan Cikedal Kabupaten PandeglangAnggaran : DAK Tahun Anggaran 2011

NO. URAIAN PEKERJAAN VOLUME

1 2 3 4 5

A. REHABILITASI 2 (DUA) RUANG KELAS

I. PEKERJAAN PERSIAPAN

1 Pek. Papan nama proyek 1.00 bh 365,680.00 365,680.00

2 Pek. Bongkaran 1.00 ls 1,000,000.00 1,000,000.00

3 Biaya Dokumentasi dan Pelaporan 1.00 ls 1,750,000.00 1,750,000.00

Jumlah I 3,115,680.00

II. PEKERJAAN TANAH DAN URUGAN

1 Pek. Urugan pasir dibawah lantai 1.35 m3 147,590.00 199,246.50

Jumlah II 199,246.50

III. PEKERJAAN BETON

1 Pek. Kolom struktur 15/20 beton Site Mix K.175 1.47 m3 #REF! #REF!2 Pek. Balok teras 15/20 beton Site Mix K.175 0.63 m3 #REF! #REF!3 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 1.52 m3 #REF! #REF!4 Pek. Pasangan bata pondasi rabat ad. 1:5 8.16 m2 89,590.00 731,054.40 5 Pek. Rabat beton tumbuk ad. 1:3:5 1.13 m3 373,360.00 421,896.80

Jumlah III #REF!IV. PEKERJAAN DINDING DAN PLESTERAN

1 Pek. Dinding bata ad. 1:5 46.10 m2 89,590.00 4,130,099.00 2 Pek. Plesteran dinding ad. 1:5 + acian 159.06 m2 46,330.00 7,369,249.80 3 Pek. Plesteran beton ad 1:3 + acian 23.80 m2 #REF! #REF!4 Pek. Dinding dan kolom teras keramik 20/25 21.36 m2 26,260.00 560,913.60

Jumlah IV #REF!V. PEKERJAAN LANTAI

1 Perbaikan Lantai keramik 30x30 cm setara KW II 91.00 m2 #REF! #REF! Jumlah V #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA 1 Pek. Kusen pintu P1 2.00 bh #REF! #REF!2 Pek. Kusen jendela J1 8.00 bh #REF! #REF!3 Pek. Kusen bouvenlight BV1 2.00 bh #REF! #REF!

Jumlah VI #REF!VII. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 204.10 m2 #REF! #REF!2 Pek. Genteng metal lapis pasir 204.10 m2 #REF! #REF!3 Pek. Nok genteng metal lapis pasir 17.00 m' #REF! #REF!4 Pek. Flashing listplank metal lapis pasir 24.00 m' #REF! #REF!5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 179.20 m2 5,565,210.00 997,285,632.00 6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 58.50 m' #REF! #REF!7 Pek. List plafond profil kayu 201.30 m' #REF! #REF!

Jumlah VII #REF!VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 359.54 m2 53,710.00 19,310,893.40 2 Pek. Pengecatan plafond sek. Decoplus 179.20 m2 143,920.00 25,790,464.00 3 Pek. Pengecatan listplank sek. Glotex 17.55 m2 122,770.00 2,154,613.50 4 Pek. Pengecatan kusen pintu/jendela sek. Glotex 64.76 m2 122,770.00 7,950,585.20

Jumlah VIII 55,206,556.10 IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE

1 Pas. Instalasi titik lampu 10.00 titik #REF! #REF!2 Pas. Instalasi titik stop kontak 2.00 titik #REF! #REF!3 Pas. Saklar tunggal broco 1.00 bh #REF! #REF!4 Pas. Saklar ganda broco 2.00 bh #REF! #REF!5 Pas. Stop kontak broco 2.00 bh #REF! #REF!6 Pas. Lampu PLC 8 watt philips 10.00 bh #REF! #REF!7 Pas. Panel MCB 5x10 A 1.00 bh #REF! #REF!

Jumlah IX #REF!

Jumlah Total #REF!

HARGA SATUAN(Rp.)

J U M L A H(Rp.)

Page 31: RAB PAGAR.xls

REKAPITULASI RINCIAN ANGGARAN BIAYA

Kegiatan : Pengembangan Sarana dan Prasarana KewilayahanPekerjaan : Pembangunan Gedung Satpas T.300Lokasi : Kabupaten LebakAnggaran : Tahun Anggaran 2014

NO. URAIAN PEKERJAAN JUMLAH (Rp.)

A. PEMBANGUNAN GEDUNG SATPAS T.300

I. PEKERJAAN PERSIAPAN 19,458,304.75 II. PEKERJAAN TANAH DAN URUGAN 27,793,277.30 III. PEKERJAAN PONDASI DAN BETON 357,117,502.37 IV. PEKERJAAN DINDING DAN PLESTERAN 119,250,571.70 V. PEKERJAAN LANTAI 41,659,063.40 VI. PEKERJAAN KUSEN PINTU DAN JENDELA 60,374,320.00 VII. PEKERJAAN ATAP DAN PLAFOND 128,734,881.40 VIII. PEKERJAAN PENGECATAN 34,898,883.60 IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATUR 41,527,500.00 X. PEKERJAAN DINDING PEREDAM SUARA 10,603,125.25 XI. PEKERJAAN SANITASI #VALUE! XII. PEKERJAAN LAIN-LAIN 12,117,550.00

REAL COST #VALUE! PPN (Pajak Pertambahan Nilai) 10% #VALUE! JUMLAH TOTAL #VALUE! DIBULATKAN #VALUE!

Terbilang : SEMBILAN RATUS ENAM PULUH EMPAT JUTA LIMA RATUS RIBU RUPIAH

Pandeglang, April 2014

Konsultan Perencana,PT. MITRA DESIGN ENGINEERING

YAYAH FAOZIAH, S.PiDirektur Utama

Page 32: RAB PAGAR.xls

RINCIAN ANGGARAN BIAYA (RAB)

Kegiatan : Pengembangan Sarana dan Prasarana KewilayahanPekerjaan : Pembangunan Gedung Satpas T.300Lokasi : Kabupaten LebakAnggaran : Tahun Anggaran 2014

NO. URAIAN PEKERJAAN VOLUME

1 2 3 4 5A. PEMBANGUNAN GEDUNG SATPAS T.300 I. PEKERJAAN PERSIAPAN

1 Pek. Papan nama proyek 1.00 bh 365,680.00 365,680.00 2 Pek. Pengukuran & Pasangan Bouwplank 85.00 m' 47,350.00 4,024,750.00 3 Pekerjaan pagar pengaman dari seng BJLS 67.93 m2 214,470.00 14,567,874.75 4 Biaya IMB (Ijin mendirikan bangunan) 1.00 ls 500,000.00 500,000.00

Jumlah I 19,458,304.75 II. PEKERJAAN TANAH DAN URUGAN

1 Pek. Galian tanah pondasi 139.07 m3 38,980.00 5,420,948.60 2 Pek. Urugan tanah kembali 46.36 m3 12,990.00 602,216.40 3 Pek. Urugan pasir dibawah pondasi,lantai dan rabat 32.70 m3 147,590.00 4,826,193.00 4 Pek. Urugan tanah peninggi lantai dipadatkan 137.61 m3 123,130.00 16,943,919.30

Jumlah II 27,793,277.30 III. PEKERJAAN PONDASI DAN BETON

1 Pas. Pondasi batu kali ad. 1 : 4 41.55 m3 667,160.00 27,720,498.00 2 Pas. Pondasi Foot Plate 60.60.30 2.81 m3 2,057,411.60 5,781,326.60 3 Pek. Lantai Kerja Beton 0.40 m3 738,450.00 295,380.00 4 Pek. Sloof 15/20 beton Site Mix K.225 4.37 m3 4,746,054.00 20,740,255.98 5 Pek. Kolom praktis 15/15 beton Site Mix K.225 5.49 m3 8,540,575.00 46,887,756.75 6 Pek. Kolom 20/20 beton Site Mix K.225 0.22 m3 3,460,271.12 761,259.65 7 Pek. Kolom 15/20 (K1)beton Site Mix K.225 3.66 m3 5,172,309.50 18,930,652.77 8 Pek.Balok 15/30 (B1)beton Site Mix K.225 4.14 m3 5,387,829.33 22,305,613.44 9 Pek.Balok 15/30 (B2)beton Site Mix K.225 3.52 m3 4,121,780.33 14,508,666.77

10 Pek.Balok 15/20 (B3)beton Site Mix K.225 0.27 m3 4,290,980.33 1,158,564.69 11 Pek.Balok 15/20 (BG)beton Site Mix K.225 0.30 m3 4,290,980.33 1,287,294.10 12 Pek. Ringbalok 15/20 beton Site Mix K.225 7.48 m3 4,538,314.00 33,946,588.72 13 Pek. Plat Dak t. 10 cm beton Site Mix K.225 19.40 m3 7,099,762.50 137,735,392.50 13 Pek. Balok lintel 10/12 beton sitemix K.225 0.39 m3 1,142,100.00 445,419.00 14 Pek. Lantai beton (Floor Hardener) sitemix K.225 4.20 m3 3,903,762.00 16,395,800.40 15 Pek. Rabat Beton ad. 1 : 3 : 5 4.94 m3 738,450.00 3,647,943.00 16 Pek. Pasangan bata perkuatan rabat ad. 1 : 3 51.00 m2 89,590.00 4,569,090.00

Jumlah III 357,117,502.37 IV. PEKERJAAN DINDING DAN PLESTERAN

1 476.63 m2 89,590.00 42,701,281.70 2 Pek. Plesteran dinding ad. 1:5 + acian 959.44 m2 70,950.00 68,072,268.00 3 Pek. Batu andesit (finish coating) 3.20 m2 268,210.00 858,272.00 4 23.00 bh 331,250.00 7,618,750.00

Jumlah IV 119,250,571.70 V. PEKERJAAN LANTAI

1 Lantai keramik Homogenous Tile (Ruangan 60x60) 229.64 m2 138,690.00 31,848,771.60 2 Lantai keramik Homogenous Tile (teras 60x60) 12.50 m2 138,690.00 1,733,625.00 3 Dinding Keramik Homogenous Tile (60x60) 18.75 m2 138,690.00 2,600,437.50 4 Dinding Keramik 20x25 warna motif 30.89 m2 122,770.00 3,792,365.30 5 Lantai Keramik KM/WC 20/20 warna (anti slip) 11.70 m2 143,920.00 1,683,864.00

Jumlah V 41,659,063.40 VI. PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pintu kaca Prame List (lengkap accecories) t. 12 mm (P1) 4.00 m2 2,750,000.00 11,000,000.00 2 Pek. Kusen Pintu & Daun Pintu Aluminium (P3) 4.00 bh 3,944,950.00 15,779,800.00 3 Pek. Kusen Pintu & Daun Pintu Aluminium (P4) 7.00 bh 1,722,870.00 12,060,090.00 4 Pek. Kusen Pintu & Daun Pintu kayu Kelas II (P2) 1.00 bh 2,606,390.00 2,606,390.00 5 Pek. Kusen & Daun Jendela (J1) 2.00 bh 1,729,570.00 3,459,140.00 6 Pek. Kusen & Daun Jendela (J2) 2.00 bh 1,994,490.00 3,988,980.00 7 Pek. Kusen & Daun Jendela (J3) 1.00 bh 1,542,770.00 1,542,770.00 8 Pek. Kusen bouvenlight (BV) 15.00 bh 246,720.00 3,700,800.00 9 Pek. Kusen pintu PVC (P5) 4.00 bh 258,000.00 1,032,000.00

10 Pek. Tralis pintu besi (P6) 1.00 bh 1,365,000.00 1,365,000.00 11 Pek. Kusen Pintu & Daun Pintu Aluminium (P7) 1.00 bh 3,839,350.00 3,839,350.00

Jumlah VI 60,374,320.00

HARGA SATUAN

(Rp.)

J U M L A H(Rp.)

Pek. Dinding 1/2 bata ad. 1:5

Pek. Huruf Stainlees " GEDUNG SATPAS POLRES LEBAK" t. 25 cm

Page 33: RAB PAGAR.xls

1 2 3 4 5VII. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 307.01 m2 155,800.00 47,832,158.00 2 Pek. Genteng Metal lapis pasir kwarsa 307.01 m2 102,760.00 31,548,347.60 3 Pek. NOK Genteng Metal lapis pasir kwarsa 48.55 m' 68,860.00 3,343,153.00 4 Pek. Plafond Gifsum Rangka Hollow 281.33 m2 111,660.00 31,413,307.80 5 Pek. Plafond GRC Rangka kayu kelas II 55.50 m2 92,690.00 5,144,295.00 6 Pek. Listplang GRC 2/30 60.00 m' 30,010.00 1,800,600.00 7 List Plafond gifsum 262.00 m' 29,210.00 7,653,020.00

Jumlah VII 128,734,881.40 VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton setara Vinilex 906.61 m2 17,800.00 16,137,658.00 2 Pek. Pengecatan plafond sek. Vinilex 336.83 m2 18,050.00 6,079,781.50 3 Pek. Pengecatan listplank sek. Glotex 18.00 m2 26,520.00 477,360.00 4 Pek. Pengecatan kayu kusen pintu& daun pintu kayu sek. Glotex 10.44 m2 26,520.00 276,868.80 5 Pek. Waterproofing 193.97 m2 61,490.00 11,927,215.30

Jumlah VIII 34,898,883.60

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATUR 1 1. Pek. Biaya penyambungan Listrik 3 Fhase (16.500 Va) 1.00 Ls ### 13,001,500.00

2. Biaya SLO (sertifikat Layak Operasi)& JIL(Jaminan Inst.Listrik) 1.00 Ls 2,475,000.00 2,475,000.00 3. Pas. Box Panel 3 Fhase MCB 25 A+Rel dan Conector 10.00 Ls 385,000.00 3,850,000.00

2 Pek. Pasangan Titik lampu 58.00 ttk 121,000.00 7,018,000.00 3 Pek. Pasangan Titik stopkontak 14.00 ttk 121,000.00 1,694,000.00 4 Pek. Pasangan Titik stopkontak ( Air Conditioner) 12.00 ttk 132,000.00 1,584,000.00 5 Pek. Pasangan Saklar Ganda 10.00 bh 24,750.00 247,500.00 6 Pek. Pasangan Saklar Tungggal 12.00 bh 16,500.00 198,000.00 7 Pek. Pasangan Stop kontak 14.00 bh 27,500.00 385,000.00 8 Pek. Pasangan lampu Baret : 40 watt 1.00 bh 192,500.00 192,500.00 9 Pek. Pasangan lampu RM 2X 20 WATT 10.00 bh 192,500.00 1,925,000.00

10 Pek. Pasangan Downlight 4 " + PLC 18 watt 48.00 bh 126,500.00 6,072,000.00 11 Pas. Box Panel include NCB 6 A. dua group 1.00 bh 110,000.00 110,000.00 12 Box zekering + Grounding 1.00 bh 275,000.00 275,000.00 13 Pek. Instalasi Penangkal petir (Splitzen 2 unit, As ( Arde ) 1/2" x 1) 1.00 Ls 2,500,000.00 2,500,000.00

Jumlah IX 41,527,500.00 X. PEKERJAAN DINDING PEREDAM SUARA

1 Pek. Pas. Glasswooll t. 2, 5 cm 71.65 m2 18,525.00 1,327,316.25 2 Pek. Rangka Holow + Gifsum 71.65 m2 111,660.00 8,000,439.00 3 Pengecatan 71.65 m2 17,800.00 1,275,370.00

Jumlah X 10,603,125.25 XI. PEKERJAAN SANITASI 1 Pas. Kloset jongkok 4.00 bh 411,840.00 1,647,360.00 2 Wastafel lengkap cermin 3.00 bh 527,835.00 1,583,505.00 3 Pas. Mini washbrook top pud urinal (Complete Set) 3.00 Set 2,629,000.00 7,887,000.00 4 Pas. Floor drain 6.00 bh 30,230.00 181,380.00 5 Pas. Kran air dia. 1/2" 4.00 bh 26,260.00 105,040.00 6 Pas. Pipa PVC dia. 1/2" 12.00 m' 12,390.00 148,680.00 7 Pas. Pipa PVC dia. 3" 22.00 m' 46,650.00 1,026,300.00 8 Pas. Pipa PVC dia. 4" 27.00 m' 55,180.00 1,489,860.00 9 Pas. Pipa PVC dia. 3" (buangan air dak beton) 43.65 m' 46,650.00 2,036,272.50 10 Pas. Pipa PVC dia. 3" Elbow 28.00 bh 46,650.00 1,306,200.00 11 Pek. Septictank+rembesan 1.00 unit 4,209,310.00 4,209,310.00 12 Pas. Tangki air kap. 1000 ltr + mesin air pendorong 1.00 unit 1,350,000.00 1,350,000.00 13 Biaya Pengadaan sarana Air Bersih + mesin pompa Jet pump 1.00 unit (hrg!H102+hrg #VALUE!

Jumlah XI #VALUE!XII. PEKERJAAN LAIN-LAIN

1 Pek. Saluran air L. 20 cm pas bata ad. 1 : 3 (finis plester+aci) 85.00 m1 136,130.00 11,571,050.00 2 Pek. Pembersihan sisa-sisa pekerjaan & puing " bangunan lama 1.00 Ls 546,500.00 546,500.00

Jumlah XII 12,117,550.00 TOTAL … #VALUE!

Page 34: RAB PAGAR.xls

REKAPITULASI RENCANA ANGGARAN BIAYA

Kegiatan : Pengembangan Sarana dan Prasarana KewilayahanPekerjaan : Pembangunan Fasum Gedung Satpas Lokasi : Kecamatan Rangkasbitungkabupaten : LebakTahun Anggaran : 2014

NO. URAIAN PEKERJAAN ANGGARAN BIAYA

I. PEKERJAAN PERSIAPAN Rp. 3,583,680.00

II. PEKERJAAN PAGAR A Rp. 18,207,150.60

III. PEKERJAAN PAGAR B Rp. 29,354,256.33

IV. PEKERJAAN PAGAR C Rp. 20,614,329.34

V. PEKERJAAN PAGAR D Rp. 10,793,861.24

VI. PEKERJAAN LAIN-LAIN Rp. 48,970,000.00

JUMLAH Rp. 131,523,277.51

PAJAK PERTAMBAHAN NILAI (PPN) 10 % Rp. 13,152,327.75

JUMLAH TOTAL Rp. 144,675,605.26

DIBULATKAN Rp. 144,675,000.00

TERBILANG : SERATUS EMPAT PULUH EMPAT JUTA ENAM RATUS TUJUH PULUH LIMA RIBU RUPIAH

Rangkasbitung, Juni 2014

Dibuat Oleh :PT. DATA ENGINEERING KONSULTAN

YUDHI APRIANTO, STDirektur Utama

Page 35: RAB PAGAR.xls

RENCANA ANGGARAN BIAYA

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Fasum Gedung Satpas

Lokasi : Kecamatan Rangkasbitung

kabupaten : Lebak

Tahun Anggaran : 2014

NO. URAIAN PEKERJAAN VOLUME

1 2 3 4 5 I. PEKERJAAN PERSIAPAN

1 Pek. Papan nama proyek 1.00 bh 365,680.00 365,680.00 2 Pek. Pengukuran dan pasang bouwplank 103.00 m' 22,000.00 2,266,000.00 3 Biaya Adiministrasi, Dokumentasi dan Pelaporan 1.00 ls 952,000.00 952,000.00

Jumlah I 3,583,680.00 II. PEKERJAAN PAGAR A

1 Pek. Galian tanah Pondasi Setempat. 5.28 m3 38,980.00 205,814.40 2 Pek. Urugan Tanah Kembali 4.09 m3 12,990.00 53,155.08 3 Pek. Pasangan Kolom Beton 20/20 1.10 m3 5,172,309.50 5,689,540.45 4 Pek. Pondasi Setempat 60/60, 1.19 m3 2,057,411.60 2,444,204.98 5 Pek. Pasangan Ringbalk Beton 15/20 1.00 m3 4,538,314.00 4,533,775.69 6 Pek. Pasangan Bata (Perbaikan Bekas Bongkaran) 15.00 m2 92,040.00 1,380,600.00 7 Pek. Pasangan Plesteran + Aci 30.00 m2 50,970.00 1,529,100.00 8 Pek. Pengecetan 133.20 m2 17,800.00 2,370,960.00

Jumlah II 18,207,150.60 III. PEKERJAAN PAGAR B

1 Pek. Galian Tanah Pondasi dan Pondasi Setempat. 12.00 m3 38,980.00 467,760.00 2 Pek. Urugan Tanah Kembali 3.60 m3 12,990.00 46,764.00 3 Pas. Pasir Urug T = 5 Cm, 0.75 m3 147,590.00 110,692.50 4 Pek. Pasangan Pondasi Batu Belah ad 1:4 8.40 m3 667,160.00 5,604,144.00 5 Pek. Pasangan Kolom Beton 20/20 1.00 m3 5,172,309.50 5,172,309.50 6 Pek. Pondasi Setempat 60/60, 1.08 m3 2,057,411.60 2,222,004.53 7 Pek. Pasangan Sloof Beton 15/20 0.75 m3 4,746,054.00 3,559,540.50 8 Pek. Pasangan Ringbalk Beton 15/20 0.45 m3 4,538,314.00 2,042,241.30 9 Pek. Pasangan Bata 28.00 m2 92,040.00 2,577,120.00 10 Pek. Pasangan Plesteran + Aci 84.00 m2 50,970.00 4,281,480.00 11 Pek. Pengecetan 84.00 m2 17,800.00 1,495,200.00 12 Pek. Profilan 71.00 m' 25,000.00 1,775,000.00

Jumlah III 29,354,256.33 IV. PEKERJAAN PAGAR C

1 Pek. Galian tanah Pondasi Setempat. 4.80 m3 38,980.00 187,104.00 2 Pek. Urugan Tanah Kembali 3.72 m3 12,990.00 48,322.80 3 Pek. Pasangan Kolom Beton 20/20 1.00 m3 5,172,309.50 5,172,309.50 4 Pek. Pondasi Setempat 60/60, 1.08 m3 2,057,411.60 2,222,004.53 5 Pek. Pasangan Ringbalk Beton 15/20 0.59 m3 4,538,314.00 2,695,758.52 6 Pek. Pasangan Bata 38.50 m2 92,040.00 3,543,540.00 7 Pek. Pasangan Plesteran + Aci 77.00 m2 50,970.00 3,924,690.00 8 Pek. Pengecetan 77.00 m2 17,800.00 1,370,600.00 9 Pek. Profilan 58.00 m' 25,000.00 1,450,000.00

Jumlah IV 20,614,329.34 V. PEKERJAAN PAGAR D

1 Pek. Galian Tanah Pondasi dan Pondasi Setempat. 5.28 m3 38,980.00 205,814.40 2 Pek. Pasangan Kolom Beton 20/20 0.60 m2 5,172,309.50 3,103,385.70 3 Pek. Pondasi Setempat 60/60, 0.65 m2 2,057,411.60 1,333,202.72 4 Pek. Pasangan Sloof Beton 15/20 0.12 ls 4,746,054.00 569,526.48 5 Pek. Pasangan Ringbalk Beton 15/20 0.21 m' 4,538,314.00 953,045.94 6 Pek. Pasangan Bata 12.00 m' 92,040.00 1,104,480.00 7 Pek. Pasangan kramik dinding 30x30 cm (plang nama) 5.40 m2 138,690.00 748,926.00 8 Pek. Pasangan Plesteran + Aci 24.00 bh 50,970.00 1,223,280.00 9 Pek. Pengecetan 24.00 bh 17,800.00 427,200.00 10 Pek. Profilan 45.00 m' 25,000.00 1,125,000.00

Jumlah V 10,793,861.24 VI. PEKERJAAN LAIN-LAIN

1 Pas. Pagar besi hollow finish cat besi 9.00 M2 550,000.00 4,950,000.00 2 Pek. Perbaikan saluran 1.00 Ls 1,500,000.00 1,500,000.00 3 Pas. Hurup Plang nama 1.00 Ls 3,000,000.00 3,000,000.00 4 Pek. Pasangan Plengkut 243.20 liter 12,500.00 3,040,000.00 5 Pek. Pasangan Gelar Aspal T = 4 cm ( ATB Kelas A ). 304.00 M2 120,000.00 36,480,000.00

Jumlah VI 48,970,000.00

HARGA SATUAN

(Rp.)

J U M L A H(Rp.)

Page 36: RAB PAGAR.xls

Jumlah Total 131,523,277.51

Page 37: RAB PAGAR.xls

DAFTAR HARGA SATUAN BAHAN DAN UPAH

Kegiatan : Pengembangan Sarana dan Prasarana KewilayahanPekerjaan : Pembangunan Gedung Satpas T.300Lokasi : Kabupaten LebakAnggaran : Tahun Anggaran 2014

NO. JENIS BAHAN/UPAH SATUAN HARGA SATUAN

A. B A H A N

1 Air kerja ltr Rp. 75.00

2 Pasir urug m3 Rp. 100,000.00 3 Pasir pasang m3 Rp. 135,000.00 4 Pasir beton m3 Rp. 175,000.00 5 Kerikil / split 1/2 m3 Rp. 215,000.00 6 Kerikil / split 2/3 m3 Rp. 215,000.00 7 Tanah urug m3 Rp. 80,000.00 8 Paving Blok Natural 6 cm m2 Rp. 60,000.00 9 Batu belah m3 Rp. 165,000.00 10 Bata merah bh Rp. 600.00 11 Batu Andesit m2 Rp. 130,000.00 12 Seng Gelombang BJLS m2 Rp. 45,000.00 13 Genteng morando natural Jtw. bh Rp. 3,800.00 14 Nok Genteng morando natural Jtw. bh Rp. 5,000.00 15 Genteng metal 2 x 4 T. 0,25 mm Setara Multiroof bh Rp. 45,000.00 16 NOK Genteng metal Setara Multiroof bh Rp. 40,000.00 17 Keramik 40 x 40 cm KW.II bh Rp. 6,900.00 18 Keramik dinding 20 x 25 cm motif KW.II m2 Rp. 52,000.00 19 Keramik anti slip 20 x 20 cm motif KW.II m2 Rp. 48,000.00 20 Semen PC kg Rp. 1,375.00 21 Semen warna kg Rp. 5,000.00 22 Balok Kayu Kelas II m3 Rp. 3,000,000.00 23 Kaso 5/7 terentang m3 Rp. 1,700,000.00 24 Papan terentang m3 Rp. 1,500,000.00 25 Kayu Balok Borneo m3 Rp. 2,047,700.00 26 Kayu dolken dia. 8-10 panjang 4 m bt Rp. 25,000.00 27 Gypsum 9 mm uk. 120 x 240 cm lbr Rp. 56,500.00 28 Bahan Plafond GRC 1 x 1 m (lokal) m2 Rp. 18,500.00 29 Kaca Bening tebal 5 mm m2 Rp. 105,000.00 30 Kaca Bening tebal 8 mm m2 Rp. 135,000.00 31 List plafond gypsum profil m' Rp. 16,000.00 32 Lisplank GRC t. 0,9 l. 20 cm p: 240 cm m1 Rp. 9,500.00 33 Plamur tembok kg Rp. 13,000.00 34 Plamur kayu kg Rp. 23,000.00 35 Tepung gypsum/kumpon kg Rp. 23,500.00 36 Cat tembok Setara Vinilex kg Rp. 25,000.00 37 Cat dasar kayu / meni kg Rp. 25,000.00 38 Cat kayu/besi Glotex kg Rp. 48,500.00 39 Cat Coating khusus batu alam kg Rp. 65,000.00 40 Water profing emultion kg Rp. 100,000.00 37 Main truss C-75 tebal 0.75 mm m' Rp. 13,500.00 38 Roof Bottom/Reng R 33-0.45 mm m' Rp. 9,500.00 39 Dynabol dia- 12 x 120 mm bh Rp. 1,750.00 40 Self Drilling Screw dia-6 x 20 mm ( Truss Screw) bh Rp. 375.00 41 Self Drilling Screw dia-4 x 16 mm ( Roof Batten Screw) bh Rp. 350.00 42 Besi beton rata-rata kg Rp. 11,750.00 43 Besi dia. 16 mm kg Rp. 11,750.00 44 Besi UNP 140.60.7 kg Rp. 11,750.00 45 Besi Hollow 40x40x400 mm btg Rp. 32,500.00 46 Density 32kg/m3, Tebal 2.5cm / 5cm @ Rp. 510.000,-/Roll m2 Rp. 14,250.00 47 Tebal 2.5cm Ukuran 1.2m x 30m

Page 38: RAB PAGAR.xls

DAFTAR HARGA SATUAN BAHAN DAN UPAH

Kegiatan : Pengembangan Sarana dan Prasarana KewilayahanPekerjaan : Pembangunan Gedung Satpas T.300Lokasi : Kabupaten LebakAnggaran : Tahun Anggaran 2014

NO. JENIS BAHAN/UPAH SATUAN HARGA SATUAN

48 Multipleks 9 mm m2 Rp. 145,000.00 49 Multipleks 4 mm m2 Rp. 65,000.00 50 tralispintu/ jendela almunium m2 Rp. 350,000.00 51 Kawat beton kg Rp. 20,000.00 52 Paku rata-rata kg Rp. 18,000.00 53 Paku skrup bh Rp. 1,000.00 54 Paku Biasa 2-5 " Pcs Rp. 90.00 55 Silent m1 Rp. 2,000.00 56 Rol cat bh Rp. 20,000.00 57 Sikat kawat bh Rp. 12,500.00 58 Kuas 3 " bh Rp. 8,000.00 59 Ampelas lbr Rp. 3,500.00 60 Lem kayu Fox kg Rp. 9,100.00 61 Engsel pintu bh Rp. 25,000.00 62 Engsel jendela bh Rp. 10,000.00 63 Handle stainless bh Rp. 240,000.00 64 Grendel pintu besar 15 cm bh Rp. 37,500.00 65 Kunci tanam 2 slaag bh Rp. 145,000.00 66 Door Closer set Rp. 255,000.00 67 Kloset Jongkok standart bh Rp. 225,750.00 68 Kloset Jongkok duduk set. Ina bh Rp. 2,000,000.00 69 Wastafel setara Toto L38VI bh Rp. 343,350.00 70 Kaca cermin Standart u/Wastafel bh Rp. 136,500.00 71 Mini washbrook top pud urinal (Complete Set set Rp. 2,390,000.00 72 Bak penampung fiberglass kap. 1000 ltr bh Rp. 800,000.00 73 Menara air besi siku 40.40*4 t=3 m kap. 1000 ltr unit Rp. 2,500,000.00 74 Mesin pompa (Jet Pump ) unit Rp. 2,550,000.00 75 Mesin Pompa pendorong unit Rp. 500,000.00 76 Kran air 1/2" bh Rp. 17,500.00 77 Floor drain bh Rp. 21,150.00 78 Ijuk lamat Rp. 5,000.00 79 Instalasi titik lampu/stop kontak ttk Rp. 110,000.00 80 Saklar tunggal Broco bh Rp. 15,000.00 81 Saklar ganda Broco bh Rp. 22,500.00 82 Stop kontak Broco bh Rp. 25,000.00 83 Lampu RM 2x20 watt bh Rp. 175,000.00 84 Lampu Down Light + PLC 18 watt bh Rp. 115,000.00 85 Lampu Baret IDB 183 40 watt bh Rp. 175,000.00 86 Box zekering + Grounding bh Rp. 250,000.00 87 Pas. Box Panel include NCB 6 A. dua group bh Rp. 100,000.00 88 Kusen pintu PVC lengkap kunci+engsel bh Rp. 215,000.00 89 Pintu Kaca Prame List t. 12 mm(lengkap Acesories) m2 Rp. 2,500,000.00 90 Kusen alumunium warna m' Rp. 70,000.00 91 Pipa PVC Wavin dia. 1/2" m' Rp. 4,000.00 92 Pipa PVC Wavin dia. 3/4" m' Rp. 8,800.00 93 Pipa PVC Wavin dia. 3" m' Rp. 20,000.00 94 Pipa PVC Wavin dia. 4" m' Rp. 25,000.00 95 Sealtif bh Rp. 1,500.00 96 Pengeboran air bersih Ls Rp. 5,500,000.00

Page 39: RAB PAGAR.xls

DAFTAR HARGA SATUAN BAHAN DAN UPAH

Kegiatan : Pengembangan Sarana dan Prasarana KewilayahanPekerjaan : Pembangunan Gedung Satpas T.300Lokasi : Kabupaten LebakAnggaran : Tahun Anggaran 2014

NO. JENIS BAHAN/UPAH SATUAN HARGA SATUAN

B. U P A H 1 Pekerja orang/hari Rp. 45,000.00 2 Tukang Gali orang/hari Rp. 50,000.00 3 Tukang Batu orang/hari Rp. 50,000.00 4 Tukang Kayu orang/hari Rp. 50,000.00 5 Tukang Cat orang/hari Rp. 50,000.00 6 Tukang Besi orang/hari Rp. 55,000.00 7 Tukang Besi Profil orang/hari Rp. 55,000.00 8 Kepala Tukang orang/hari Rp. 55,000.00 9 Kepala Tukang Besi Profil orang/hari Rp. 65,000.00 10 Mandor orang/hari Rp. 67,500.00

Page 40: RAB PAGAR.xls

DAFTAR HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana KewilayahanPekerjaan : Pembangunan Gedung Satpas T.300Lokasi : Kabupaten LebakAnggaran : Tahun Anggaran 2014

NO URAIAN PEKERJAAN

1 1 BH PAPAN NAMA PROYEK 365,680.00 2 1 M' PEK. PENGUKURAN DAN PEMASANGAN BOUWPLANK 47,350.00 3 1 M2 KANTOR DIREKSI KEET 867,730.00 4 PEMBUATAN 1 M2 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M 214,470.00 5 1 M3 GALIAN TANAH BIASA SEDALAM 1 METER 38,980.00 6 1 M3 URUGAN TANAH KEMBALI 12,990.00 7 1 M3 URUGAN TANAH DARI LUAR DIPADATKAN 123,130.00 8 1 M3 URUGAN PASIR 147,590.00 9 1 M3 PASANG PONDASI BATU KALI 1 Pc : 4 Ps 667,160.00

10 1 M3 PASANG PONDASI BATU KOSONG 330,630.00 11 1 M2 PASANGAN PAVING BLOCK NATURAL 6 CM 131,890.00 12 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 3 Ps 95,940.00 13 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps 92,040.00 14 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps 89,590.00 15 1 M2 PLESTERAN 1 Pc : 3 Ps, TEBAL 20 MM 46,330.00 16 1 M2 PLESTERAN 1 Pc : 4 Ps, TEBAL 20 MM 50,970.00 17 1 M2 PLESTERAN 1 Pc : 5 Ps, TEBAL 20 MM 49,290.00 17 1 M2 ACIAN Pc 21,660.00 18 1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU KELAS II 5,412,930.00 19 1 M2 PASANG PINTU PANEL KAYU KELAS II 373,360.00 20 MEMBUAT DAN MEMASANG 1 BUAH PINTU PANEL KAYU KELAS II ( TYPE P.1) 2,606,390.00 21 1 M2 PASANG RANGKA LANGIT-LANGIT(1.20x1,20) M BESI HOLLOW 40x40 MM 78,490.00 22 1 M2 PASANG RANGKA LANGIT-LANGIT(0.50x1,00) M KAYU KELAS II ATAU III 64,060.00 18 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr 738,450.00 24 1 KG PEMBESIAN DENGAN BESI POLOS ATAU ULIR 14,740.00 25 1 M2 PASANG BEKISTING UNTUK PONDASI 89,630.00 26 1 M2 PASANG BEKISTING UNTUK SLOOF 94,300.00 27 1 M2 PASANG BEKISTING UNTUK KOLOM 152,280.00 28 1 M2 PASANG BEKISTING UNTUK BALOK 152,280.00 29 1 M2 PASANG BEKISTING UNTUK LANTAI 207,280.00 30 1 M3 MEMBUAT BETON DENGAN MUTU K 175 899,150.00 31 1 M3 MEMBUAT BETON DENGAN MUTU K 225 964,250.00 32 1 M2 PASANG LANGIT-LANGIT GYPSUM 9 MM 33,170.00 33 1 M1 PASANG LIST GYPSUM PROFIL 29,210.00 34 1 M2 PASANG LANGIT-LANGIT GRC LOKAL 1 x 1 M 28,630.00 35 1 m1 PASANG LISPLANK GRC (10X300) 30,010.00 36 MEMASANG 1 BUAH KLOSET DUDUK SET. INA 2,363,510.00 37 MEMASANG 1 BUAH KLOSET JONGKOK STANDART 411,840.00 38 MEMASANG 1 BUAH WASTAFEL 586,240.00 39 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1/2" 12,390.00 40 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3/4" 20,580.00 41 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3" 46,650.00 42 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4" 55,180.00 43 1 UNIT SEPTICTANK 2 x 1 x 1,5 M + REMBESANNYA (VOLUME = 3 M3) 4,209,310.00 44 MEMASANG 1 BUAH KRAN DIAMETER 3/4" ATAU 1/2" 26,260.00 45 MEMASANG 1 BUAH FLOOR DRAIN 30,230.00 46 1 BUAH PASANG KUNCI TANAM BIASA 188,470.00 47 1 BUAH PASANG ENGSEL PINTU 37,450.00 48 1 BUAH PASANG GRENDEL 15 CM 53,710.00 49 1 M2 PASANG KACA POLOS, TEBAL 5 MM 137,000.00 50 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM ANTI SLIP 143,920.00 51 1 M2 PASANG LANTAI KERAMIK WARNA 30 X 30 CM 138,690.00

HARGA SATUAN(Rp)

Page 41: RAB PAGAR.xls

DAFTAR HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana KewilayahanPekerjaan : Pembangunan Gedung Satpas T.300Lokasi : Kabupaten LebakAnggaran : Tahun Anggaran 2014

NO URAIAN PEKERJAANHARGA SATUAN

(Rp)

52 1 M2 PASANG DINDING KERAMIK 20 X 25 CM 122,770.00 53 1 M' SALURAN PASANGAN BATA 1 : 4 L = 20 CM 136,130.00 54 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 17,800.00 55 1 M2 PENGECATAN PLAFOND BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 18,050.00 56 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 26,520.00 57 1 M2 COATING BATU ANDESIT 125,210.00 58 1 M2 WATER PROOFING 61,490.00 59 1 UNIT PINTU ALUMINIUM (PU) 6,215,310.00 60 1 UNIT PINTU ALUMINIUM (P3) 3,944,950.00 61 1 UNIT PINTU ALUMINIUM (P1) 1,722,870.00 62 1 UNIT PINTU ALUMINIUM (P7) 3,839,350.00 63 1 UNIT JENDELA ALUMINIUM (J3) 1,542,770.00 64 1 UNIT JENDELA ALUMINIUM (J2) 1,994,490.00 65 1 UNIT JENDELA ALUMINIUM (J1) 1,729,570.00 66 1 UNIT BOUVENLIGHT (BV1) 246,720.00 67 1 BH PINTU BESI type PJ1-A 3,936,030.00 68 1 BH PINTU BESI type PJ1-B 4,660,550.00 69 1 BH PINTU BESI type PJ1-C 4,598,510.00 70 1 Unit Kusen Bouvenligh Tralis BV2 378,890.00 71 1 Unit Kusen Bouvenligh Tralis BV3 999,130.00 72 1 BH PINTU BESI type PB-1 1,934,620.00 73 1M2 PEKERJAAN PASANGAN GENTENG MORANDO NATURAL JTW 93,640.00 74 1M2 PEKERJAAN PASANGAN NOK GENTENG MORANDO NATURAL JTW 115,810.00 75 1 M2 PEKERJAAN KONSTRUKSI BAJA RINGAN ( BERSERTIFIKAT DAN BERGARANSI) 155,800.00 76 1 M2 PEKERJAAN GENTENG METAL ROOF LAPIS PASIR KWARSA 102,760.00 77 1 M' PEKERJAAN NOK GENTENG METAL SHEET LAPIS PASIR KWARSA 68,860.00

Page 42: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIEN

1 1 BH PAPAN NAMA PROYEK

Kayu terentang, balok 0.1300 M3 1,700,000.00 221,000.00

Paku 0.2500 Kg 18,000.00 4,500.00

Cat minyak 1.0000 Ltr 48,500.00 48,500.00

Penulisan 0.1250 Ls 340,000.00 42,500.00

Ongkos pasang 0.1250 Ls 127,500.00 15,937.50

Jumlah 332,437.50

Overhead & Profit (10%) 33,243.75

Jumlah Total 365,681.25

Dibulatkan 365,680.00

2 1 M' PEK. PENGUKURAN DAN PEMASANGAN BOUWPLANK

Kayu Balok 5/7 0.0120 M³ 1,700,000.00 20,400.00

Paku biasa 2" - 3" 0.0200 Kg 18,000.00 360.00

Kayu papan 3/20 0.0070 M³ 1,700,000.00 11,900.00

Tukang kayu 0.1000 Oh 50,000.00 5,000.00

Pekerja 0.1000 Oh 45,000.00 4,500.00

Kepala Tukang 0.0100 Oh 55,000.00 550.00

Mandor 0.0050 Oh 67,500.00 337.50

Jumlah 43,047.50

Overhead & Profit (10%) 4,304.75

Jumlah Total 47,352.25

Dibulatkan 47,350.00

1 1 M2 KANTOR DIREKSI KEET

Dolken Kayu Ø 8 - 10/400 cm 1.250 btg 25,000.00 31,250.00

Kayu Balok Borneo 0.180 m3 2,047,700.00 368,586.00

Paku 0.850 Kg 18,000.00 15,300.00

Besi Strip 1.100 Kg 3,500.00 3,850.00

Semen Portland 35.000 Kg 1,375.00 48,125.00

Multipleks 4 mm 0.150 m3 65,000.00 9,750.00

Bata merah 30.000 bh 600.00 18,000.00

Seng Plat 0.250 lbr 45,000.00 11,250.00

Kunci Tanam 0.150 bh 145,000.00 21,750.00

Plywood 4 mm 0.060 lbr 18,500.00 1,110.00

Tukang kayu 2.000 Oh 50,000.00 100,000.00

Tukang batu 1.000 Oh 50,000.00 50,000.00

Pekerja 2.000 Oh 45,000.00 90,000.00

Kepala tukang 0.300 Oh 55,000.00 16,500.00

Mandor 0.050 Oh 67,500.00 3,375.00

Jumlah 788,846.00

Overhead & Profit (10%) 78,884.60

Jumlah Total 867,730.60

Dibulatkan 867,730.00

3

Pekerja 0.2000 Oh 45,000.00 9,000.00

Tukang Kayu 0.4000 Oh 50,000.00 20,000.00

Kepala Tukang 0.0200 Oh 55,000.00 1,100.00

Mandor 0.0200 Oh 67,500.00 1,350.00

Dolken kayu φ 8-10/400 cm 1.2500 Btg 25,000.00 31,250.00

Semen portland 2.5000 Kg 1,375.00 3,437.50

Seng gelombang 1.2000 Lbr 45,000.00 54,000.00

Pasir beton 0.0050 m3 175,000.00 875.00

Koral beton 0.0090 m3 215,000.00 1,935.00

Kayu 5/7 0.0720 m3 1,700,000.00 122,400.00

Paku biasa 2” 0.0600 Kg 18,000.00 1,080.00

HARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

PEMBUATAN 1 M2 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M

Page 43: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

Meni besi 0.4500 Ltr 25,000.00 11,250.00

Jumlah 194,977.50

Overhead & Profit (10%) 19,497.75

Jumlah Total 214,475.25

Dibulatkan 214,470.00

3 1 M3 GALIAN TANAH BIASA SEDALAM 1 METER

Pekerja 0.7500 Oh 45,000.00 33,750.00

Mandor 0.0250 Oh 67,500.00 1,687.50

Jumlah 35,437.50

Overhead & Profit (10%) 3,543.75

Jumlah Total 38,981.25

Dibulatkan 38,980.00

Page 44: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

4 1 M3 URUGAN TANAH KEMBALI

Pekerja 0.2500 Oh 45,000.00 11,250.00

Mandor 0.0083 Oh 67,500.00 562.50

Jumlah 11,812.50

Overhead & Profit (10%) 1,181.25

Jumlah Total 12,993.75

Dibulatkan 12,990.00

5 1 M3 URUGAN TANAH DARI LUAR DIPADATKAN

Tanah urug 1.2000 M3 80,000.00 96,000.00

Pekerja 0.2500 Org 45,000.00 11,250.00

Mandor 0.0250 Org 67,500.00 1,687.50

Alat bantu ( sewa stemper ) 0.1250 Lot 24,000.00 3,000.00

Jumlah 111,937.50

Overhead & Profit (10%) 11,193.75

Jumlah Total 123,131.25

Dibulatkan 123,130.00

6 1 M3 URUGAN PASIR

Pasir urug 1.2000 M³ 100,000.00 120,000.00

Pekerja 0.3000 Oh 45,000.00 13,500.00

Mandor 0.0100 Oh 67,500.00 675.00

Jumlah 134,175.00

Overhead & Profit (10%) 13,417.50

Jumlah Total 147,592.50

Dibulatkan 147,590.00

7 1 M3 PASANG PONDASI BATU KALI 1 Pc : 4 Ps

Batu belah 15/20 1.2000 M³ 165,000.00 198,000.00

Semen Portland 163.0000 Kg 1,375.00 224,125.00

Pasir pasang 0.5200 M³ 135,000.00 70,200.00

Pekerja 1.5000 Oh 45,000.00 67,500.00

Tukang batu 0.7500 Oh 50,000.00 37,500.00

Kepala Tukang 0.0750 Oh 55,000.00 4,125.00

Mandor 0.0750 Oh 67,500.00 5,062.50

Jumlah 606,512.50

Overhead & Profit (10%) 60,651.25

Jumlah Total 667,163.75

Dibulatkan 667,160.00

8 1 M3 PASANG PONDASI BATU KOSONG

Batu belah 15/20 1.2000 M³ 165,000.00 198,000.00

Pasir urug 0.4320 M³ 100,000.00 43,200.00

Pekerja 0.7800 Oh 45,000.00 35,100.00

Tukang batu 0.3900 Oh 50,000.00 19,500.00

Kepala Tukang 0.0390 Oh 55,000.00 2,145.00

Mandor 0.0390 Oh 67,500.00 2,632.50

Jumlah 300,577.50

Overhead & Profit (10%) 30,057.75

Jumlah Total 330,635.25

Dibulatkan 330,630.00

Page 45: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

9 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 3 Ps

Bata merah 70.0000 Bh 600.00 42,000.00

Semen Portland 14.3700 Kg 1,375.00 19,758.75

Pasir pasang 0.0400 M³ 135,000.00 5,400.00

Pekerja 0.3000 Oh 45,000.00 13,500.00

Tukang batu 0.1000 Oh 50,000.00 5,000.00

Kepala Tukang 0.0100 Oh 55,000.00 550.00

Mandor 0.0150 Oh 67,500.00 1,012.50

Jumlah 87,221.25

Overhead & Profit (10%) 8,722.13

Jumlah Total 95,943.38

Dibulatkan 95,940.00

10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 4 Ps

Bata merah 70.0000 Bh 600.00 42,000.00

Semen Portland 11.5000 Kg 1,375.00 15,812.50

Pasir pasang 0.0430 M³ 135,000.00 5,805.00

Pekerja 0.3000 Oh 45,000.00 13,500.00

Tukang batu 0.1000 Oh 50,000.00 5,000.00

Kepala Tukang 0.0100 Oh 55,000.00 550.00

Mandor 0.0150 Oh 67,500.00 1,012.50

Jumlah 83,680.00

Overhead & Profit (10%) 8,368.00

Jumlah Total 92,048.00

Dibulatkan 92,040.00

11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 Pc : 5 Ps

Bata merah 70.0000 Bh 600.00 42,000.00

Semen Portland 9.6800 Kg 1,375.00 13,310.00

Pasir pasang 0.0450 M³ 135,000.00 6,075.00

Pekerja 0.3000 Oh 45,000.00 13,500.00

Tukang batu 0.1000 Oh 50,000.00 5,000.00

Kepala Tukang 0.0100 Oh 55,000.00 550.00

Mandor 0.0150 Oh 67,500.00 1,012.50

Jumlah 81,447.50

Overhead & Profit (10%) 8,144.75

Jumlah Total 89,592.25

Dibulatkan 89,590.00

12 1 M2 PLESTERAN 1 Pc : 3 Ps, TEBAL 20 MM

Semen Portland 10.3680 Kg 1,375.00 14,256.00

Pasir pasang 0.0310 M³ 135,000.00 4,185.00

Pekerja 0.2600 Oh 45,000.00 11,700.00

Tukang batu 0.2000 Oh 50,000.00 10,000.00

Kepala Tukang 0.0200 Oh 55,000.00 1,100.00

Mandor 0.0130 Oh 67,500.00 877.50

Jumlah 42,118.50

Overhead & Profit (10%) 4,211.85

Jumlah Total 46,330.35

Dibulatkan 46,330.00

Page 46: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

13 1 M2 PLESTERAN 1 Pc : 4 Ps, TEBAL 20 MM

Semen Portland 8.3200 Kg 1,375.00 11,440.00

Pasir pasang 0.0320 M³ 135,000.00 4,320.00

Pekerja 0.4000 Oh 45,000.00 18,000.00

Tukang batu 0.2000 Oh 50,000.00 10,000.00

Kepala Tukang 0.0200 Oh 55,000.00 1,100.00

Mandor 0.0220 Oh 67,500.00 1,485.00

Jumlah 46,345.00

Overhead & Profit (10%) 4,634.50

Jumlah Total 50,979.50

Dibulatkan 50,970.00

14 1 M2 PASANG PAVING BLOK NATURAL T= 6 CM

Paving Block T= 6 cm 1.0000 m2 60,000.00 60,000.00

Pasir pasang 0.049 M³ 135,000.00 6,615.00

Pekerja 0.700 Oh 45,000.00 31,500.00

Tukang batu 0.350 Oh 50,000.00 17,500.00

Kepala Tukang 0.035 Oh 55,000.00 1,925.00

Mandor 0.035 Oh 67,500.00 2,362.50

Jumlah 119,902.50

Overhead & Profit (10%) 11,990.25

Jumlah Total 131,892.75

Dibulatkan 131,890.00

15 1 M2 PLESTERAN 1 Pc : 5 Ps, TEBAL 20 MM

Semen Portland 6.9120 Kg 1,375.00 9,504.00

Pasir pasang 0.0350 M³ 135,000.00 4,725.00

Pekerja 0.4000 Oh 45,000.00 18,000.00

Tukang batu 0.2000 Oh 50,000.00 10,000.00

Kepala Tukang 0.0200 Oh 55,000.00 1,100.00

Mandor 0.0220 Oh 67,500.00 1,485.00

Jumlah 44,814.00

Overhead & Profit (10%) 4,481.40

Jumlah Total 49,295.40

Dibulatkan 49,290.00

16 1 M2 ACIAN Pc

Semen Portland 3.2500 Kg 1,375.00 4,468.75

Pekerja 0.2000 Oh 45,000.00 9,000.00

Tukang batu 0.1000 Oh 50,000.00 5,000.00

Kepala Tukang 0.0100 Oh 55,000.00 550.00

Mandor 0.0100 Oh 67,500.00 675.00

Jumlah 19,693.75

Overhead & Profit (10%) 1,969.38

Jumlah Total 21,663.13

Dibulatkan 21,660.00

17 1 M3 PASANG KUSEN PINTU DAN JENDELA KAYU KELAS II

Kayu, balok 1.2000 M³ 3,000,000.00 3,600,000.00

Paku 10 cm 1.2500 kg 18,000.00 22,500.00

Lem kayu 1.0000 kg 9,100.00 9,100.00

Pekerja 6.0000 Oh 45,000.00 270,000.00

Tukang kayu 18.0000 Oh 50,000.00 900,000.00

Kepala Tukang 1.8000 Oh 55,000.00 99,000.00

Mandor 0.3000 Oh 67,500.00 20,250.00

Jumlah 4,920,850.00

Overhead & Profit (10%) 492,085.00

Jumlah Total 5,412,935.00

Page 47: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

Dibulatkan 5,412,930.00

Page 48: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

17 1 M2 PASANG PINTU PANEL KAYU KELAS II

Kayu, papan 0.0400 M³ 3,000,000.00 120,000.00

Lem kayu 0.5000 kg 9,100.00 4,550.00

Pekerja 1.0000 Oh 45,000.00 45,000.00

Tukang kayu 3.0000 Oh 50,000.00 150,000.00

Kepala Tukang 0.3000 Oh 55,000.00 16,500.00

Mandor 0.0500 Oh 67,500.00 3,375.00

Jumlah 339,425.00

Overhead & Profit (10%) 33,942.50

Jumlah Total 373,367.50

Dibulatkan 373,360.00

18 MEMBUAT DAN MEMASANG 1 BUAH PINTU PANEL KAYU KELAS II ( TYPE P.1)

Kusen pintu kayu kelas II uk. 5/14 cm 0.0686 m3 5,412,930.00 371,327.00

Daun pintu panel kayu kelas II uk 160x210 4.0000 m2 373,360.00 1,493,440.00

Jalusi Kaca Polos 5 mm 0.3600 m2 105,000.00 37,800.00

Accessories :

Kunci tanam 2 Slaag 1.0000 bh 188,470.00 188,470.00

Grendel pintu besar 1.0000 bh 53,710.00 53,710.00

Engsel pintu 6.0000 ps 37,450.00 224,700.00

Jumlah 2,369,447.00

Overhead & Profit (10%) 236,944.70

Jumlah Total 2,606,391.70

Dibulatkan 2,606,390.00

19 1 M2 PASANG RANGKA LANGIT-LANGIT(1.20x1,20) M BESI HOLLOW 40x40 MM

Besi hollow 40x40 mm 1.3500 Btg 32,500.00 43,875.00

Paku biasa 2" - 5" 0.1000 Kg 18,000.00 1,800.00

Pekerja 0.1500 Oh 45,000.00 6,750.00

Tukang kayu 0.2500 Oh 50,000.00 12,500.00

Kepala Tukang 0.0250 Oh 55,000.00 1,375.00

Mandor 0.0750 Oh 67,500.00 5,062.50

Jumlah 71,362.50

Overhead & Profit (10%) 7,136.25

Jumlah Total 78,498.75

Dibulatkan 78,490.00

20 1 M2 PASANG RANGKA LANGIT-LANGIT(0.50x1,00) M KAYU KELAS II ATAU III

Kayu, kaso 0.0154 M3 1,700,000.00 26,180.00

Paku biasa 7- 10 CM 0.2000 Kg 18,000.00 3,600.00

Pekerja 0.1500 Oh 45,000.00 6,750.00

Tukang kayu 0.3000 Oh 50,000.00 15,000.00

Kepala Tukang 0.0300 Oh 55,000.00 1,650.00

Mandor 0.0750 Oh 67,500.00 5,062.50

Jumlah 58,242.50

Overhead & Profit (10%) 5,824.25

Jumlah Total 64,066.75

Dibulatkan 64,060.00

Page 49: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

21 1 M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr

Semen Portland 218.0000 Kg 1,375.00 299,750.00

Pasir beton 0.5200 M³ 175,000.00 91,000.00

Koral beton (maksimum 30 mm) 0.8700 M³ 215,000.00 187,050.00

Pekerja 1.6500 Oh 45,000.00 74,250.00

Tukang batu 0.2500 Oh 50,000.00 12,500.00

Kepala Tukang 0.0250 Oh 55,000.00 1,375.00

Mandor 0.0800 Oh 67,500.00 5,400.00

Jumlah 671,325.00

Overhead & Profit (10%) 67,132.50

Jumlah Total 738,457.50

Dibulatkan 738,450.00

22 1 KG PEMBESIAN DENGAN BESI POLOS ATAU ULIR

Besi beton (polos/ulir) 1.0500 Kg 11,750.00 12,337.50

Kawat beton 0.0150 Kg 20,000.00 300.00

Pekerja 0.0070 Oh 45,000.00 315.00

Tukang besi 0.0070 Oh 55,000.00 385.00

Kepala Tukang 0.0007 Oh 55,000.00 38.50

Mandor 0.0004 Oh 67,500.00 27.00

Jumlah 13,403.00

Overhead & Profit (10%) 1,340.30

Jumlah Total 14,743.30

Dibulatkan 14,740.00

23 1 M2 PASANG BEKISTING UNTUK PONDASI

Kayu terentang (2 X Pakai ) 50% 0.0200 M³ 1,700,000.00 34,000.00

Paku biasa 2" - 5" 0.3000 Kg 18,000.00 5,400.00

Minyak bekisting 0.1000 Ltr 25,000.00 2,500.00

Pekerja 0.5200 Oh 45,000.00 23,400.00

Tukang kayu 0.2600 Oh 50,000.00 13,000.00

Kepala Tukang 0.0260 Oh 55,000.00 1,430.00

Mandor 0.0260 Oh 67,500.00 1,755.00

Jumlah 81,485.00

Overhead & Profit (10%) 8,148.50

Jumlah Total 89,633.50

Dibulatkan 89,630.00

24 1 M2 PASANG BEKISTING UNTUK SLOOF

Kayu terentang (2 X Pakai ) 50% 0.0225 M³ 1,700,000.00 38,250.00

Paku biasa 2" - 5" 0.3000 Kg 18,000.00 5,400.00

Minyak bekisting 0.1000 Ltr 25,000.00 2,500.00

Pekerja 0.5200 Oh 45,000.00 23,400.00

Tukang kayu 0.2600 Oh 50,000.00 13,000.00

Kepala Tukang 0.0260 Oh 55,000.00 1,430.00

Mandor 0.0260 Oh 67,500.00 1,755.00

Jumlah 85,735.00

Overhead & Profit (10%) 8,573.50

Jumlah Total 94,308.50

Dibulatkan 94,300.00

Page 50: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

25 1 M2 PASANG BEKISTING UNTUK KOLOM

Kayu terentang (2 X Pakai ) 50% 0.0200 M³ 1,700,000.00 34,000.00

Paku biasa 2" - 5" 0.4000 Kg 18,000.00 7,200.00

Minyak bekisting 0.2000 Ltr 25,000.00 5,000.00

Papan kayu terentang ( 2 X Pakai ) 50% 0.0100 M³ 1,700,000.00 17,000.00

Dolken kayu galam Ø 8-10/400 cm ( 2 X Pakai ) 50% 1.0000 Btg 25,000.00 25,000.00

Pekerja 0.6600 Oh 45,000.00 29,700.00

Tukang kayu 0.3300 Oh 50,000.00 16,500.00

Kepala Tukang 0.0330 Oh 55,000.00 1,815.00

Mandor 0.0330 Oh 67,500.00 2,227.50

Jumlah 138,442.50

Overhead & Profit (10%) 13,844.25

Jumlah Total 152,286.75

Dibulatkan 152,280.00

26 1 M2 PASANG BEKISTING UNTUK BALOK

Kayu terentang (2 X Pakai ) 50% 0.0200 M³ 1,700,000.00 34,000.00

Paku biasa 2" - 5" 0.4000 Kg 18,000.00 7,200.00

Minyak bekisting 0.2000 Ltr 25,000.00 5,000.00

Papan kayu terentang ( 2 X Pakai ) 50% 0.0100 M³ 1,700,000.00 17,000.00

Dolken kayu galam Ø 8-10/400 cm ( 2 X Pakai ) 50% 1.0000 Btg 25,000.00 25,000.00

Pekerja 0.6600 Oh 45,000.00 29,700.00

Tukang kayu 0.3300 Oh 50,000.00 16,500.00

Kepala Tukang 0.0330 Oh 55,000.00 1,815.00

Mandor 0.0330 Oh 67,500.00 2,227.50

Jumlah 138,442.50

Overhead & Profit (10%) 13,844.25

Jumlah Total 152,286.75

Dibulatkan 152,280.00

27 1 M2 PASANG BEKISTING UNTUK LANTAI

Kayu terentang (2 X Pakai ) 50% 0.0200 M³ 1,700,000.00 34,000.00

Paku biasa 2" - 5" 0.4000 Kg 18,000.00 7,200.00

Minyak bekisting 0.2000 Ltr 25,000.00 5,000.00

Papan kayu terentang ( 2 X Pakai ) 50% 0.0100 M³ 1,700,000.00 17,000.00

Dolken kayu galam Ø 8-10/400 cm ( 2 X Pakai ) 50% 3.0000 Btg 25,000.00 75,000.00

Pekerja 0.6600 Oh 45,000.00 29,700.00

Tukang kayu 0.3300 Oh 50,000.00 16,500.00

Kepala Tukang 0.0330 Oh 55,000.00 1,815.00

Mandor 0.0330 Oh 67,500.00 2,227.50

Jumlah 188,442.50

Overhead & Profit (10%) 18,844.25

Jumlah Total 207,286.75

Dibulatkan 207,280.00

28 1 M3 MEMBUAT BETON DENGAN MUTU K 175

Semen Portland 326.0000 Kg 1,375.00 448,250.00

Pasir beton 0.54000 m3 175,000.00 94,500.00

Koral beton (maksimum 30 mm) 0.76000 kg 215,000.00 163,400.00

Air 215.000 ltr 75.00 16,125.00

Pekerja 1.6500 Oh 45,000.00 74,250.00

Tukang batu 0.2750 Oh 50,000.00 13,750.00

Kepala Tukang 0.0280 Oh 55,000.00 1,540.00

Mandor 0.0830 Oh 67,500.00 5,602.50

Jumlah 817,417.50

Overhead & Profit (10%) 81,741.75

Jumlah Total 899,159.25

Page 51: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

Dibulatkan 899,150.00

Page 52: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

29 1 M3 MEMBUAT BETON DENGAN MUTU K 225

Semen Portland 371.00000 Kg 1,375.00 510,125.00

Pasir beton 0.50000 m3 175,000.00 87,500.00

Koral beton (maksimum 30 mm) 0.78000 m3 215,000.00 167,700.00

Air 215.000 ltr 75.00 16,125.00

Pekerja 1.6500 Oh 45,000.00 74,250.00

Tukang batu 0.2750 Oh 50,000.00 13,750.00

Kepala Tukang 0.0280 Oh 55,000.00 1,540.00

Mandor 0.0830 Oh 67,500.00 5,602.50

Jumlah 876,592.50

Overhead & Profit (10%) 87,659.25

Jumlah Total 964,251.75

Dibulatkan 964,250.00

30 1 M2 PASANG LANGIT-LANGIT GYPSUM 9 MM

Plat Gypsum tebal 9 mm 0.3640 Lbr 56,500.00 20,566.00

Paku 0.1100 Kg 18,000.00 1,980.00

Pekerja 0.1000 Oh 45,000.00 4,500.00

Tukang kayu 0.0500 Oh 50,000.00 2,500.00

Kepala Tukang 0.0050 Oh 55,000.00 275.00

Mandor 0.0050 Oh 67,500.00 337.50

Jumlah 30,158.50

Overhead & Profit (10%) 3,015.85

Jumlah Total 33,174.35

Dibulatkan 33,170.00

31 1 M1 PASANG LIST GYPSUM PROFIL

List gypsum profil 1.0500 m' 16,000.00 16,800.00

Tepung gypsum 0.1500 Kg 23,500.00 3,525.00

Pekerja 0.0600 Oh 45,000.00 2,700.00

Tukang kayu 0.0600 Oh 50,000.00 3,000.00

Kepala Tukang 0.0060 Oh 55,000.00 330.00

Mandor 0.0030 Oh 67,500.00 202.50

Jumlah 26,557.50

Overhead & Profit (10%) 2,655.75

Jumlah Total 29,213.25

Dibulatkan 29,210.00

Page 53: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

32 1 M2 PASANG LANGIT-LANGIT GRC LOKAL 1 x 1 M

Plat GRC LOKAL 1.1000 Lbr 18,500.00 20,350.00

Paku 0.0100 Kg 18,000.00 180.00

Pekerja 0.0300 Oh 45,000.00 1,350.00

Tukang kayu 0.0700 Oh 50,000.00 3,500.00

Kepala Tukang 0.0070 Oh 55,000.00 385.00

Mandor 0.0040 Oh 67,500.00 270.00

Jumlah 26,035.00

Overhead & Profit (10%) 2,603.50

Jumlah Total 28,638.50

Dibulatkan 28,630.00

33 1 m1 PASANG LISPLANK GRC (10X300)

Listplank GRC 10/300 mm 1.1000 m' 9,500.00 10,450.00

Paku 5 cm dan 7 cm 0.0500 kg 18,000.00 900.00

Pekerja 0.1000 OH 45,000.00 4,500.00

Tukang kayu 0.2000 OH 50,000.00 10,000.00

Kepala tukang 0.0200 OH 55,000.00 1,100.00

Mandor 0.0050 OH 67,500.00 337.50

Jumlah 27,287.50

Overhead & Profit (10%) 2,728.75

Jumlah Total 30,016.25

Dibulatkan 30,010.00

34 MEMASANG 1 BUAH KLOSET DUDUK SET. INA

Kloset Duduk set. Ina 1.0000 Bh 2,000,000.00 2,000,000.00

Semen portland 6.0000 Kg 1,375.00 8,250.00

Pasir Pasang 0.0100 M³ 135,000.00 1,350.00

Pekerja 1.0000 Oh 45,000.00 45,000.00

Tukang Batu 1.5000 Oh 50,000.00 75,000.00

Kepala Tukang 0.1500 Oh 55,000.00 8,250.00

Mandor 0.1600 Oh 67,500.00 10,800.00

Jumlah 2,148,650.00

Overhead & Profit (10%) 214,865.00

Jumlah Total 2,363,515.00

Dibulatkan 2,363,510.00

35 MEMASANG 1 BUAH KLOSET JONGKOK STANDART

Kloset Jongkok Sandart 1.0000 Bh 225,750.00 225,750.00

Semen portland 6.0000 Kg 1,375.00 8,250.00

Pasir Pasang 0.0100 M³ 135,000.00 1,350.00

Pekerja 1.0000 Oh 45,000.00 45,000.00

Tukang Batu 1.5000 Oh 50,000.00 75,000.00

Kepala Tukang 0.1500 Oh 55,000.00 8,250.00

Mandor 0.1600 Oh 67,500.00 10,800.00

Jumlah 374,400.00

Overhead & Profit (10%) 37,440.00

Jumlah Total 411,840.00

Dibulatkan 411,840.00

36 MEMASANG 1 BUAH WASTAFEL

Wastafel Setara Toto 1.0000 Unit 343,350.00 343,350.00

Semen portland 6.0000 Kg 1,375.00 8,250.00

Pasir Pasang 0.0100 M³ 135,000.00 1,350.00

Perlengkapan 12 % Harga Wastafel 0.1200 % 343,350.00 41,202.00

Pekerja 1.2000 Oh 45,000.00 54,000.00

Tukang Batu 1.4500 Oh 50,000.00 72,500.00

Kepala Tukang 0.1500 Oh 55,000.00 8,250.00

Page 54: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

Mandor 0.0600 Oh 67,500.00 4,050.00

Jumlah 532,952.00

Overhead & Profit (10%) 53,295.20

Jumlah Total 586,247.20

Dibulatkan 586,240.00

Page 55: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

37 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 1/2"

Pipa PVC 1.2000 M' 4,000.00 4,800.00

Perlengkapan 35,0% Harga pipa 1,400.00 1,400.00

Pekerja 0.0360 Oh 45,000.00 1,620.00

Tukang Batu 0.0600 Oh 50,000.00 3,000.00

Kepala Tukang 0.0060 Oh 55,000.00 330.00

Mandor 0.0018 Oh 67,500.00 121.50

Jumlah 11,271.50

Overhead & Profit (10%) 1,127.15

Jumlah Total 12,398.65

Dibulatkan 12,390.00

38 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3/4"

Pipa PVC 1.2000 M' 8,800.00 10,560.00

Perlengkapan 35,0% Harga pipa 3,080.00 3,080.00

Pekerja 0.0360 Oh 45,000.00 1,620.00

Tukang Batu 0.0600 Oh 50,000.00 3,000.00

Kepala Tukang 0.0060 Oh 55,000.00 330.00

Mandor 0.0018 Oh 67,500.00 121.50

Jumlah 18,711.50

Overhead & Profit (10%) 1,871.15

Jumlah 20,582.65

Dibulatkan 20,580.00

39 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 3"

Pipa PVC 1.2000 M' 20,000.00 24,000.00

Perlengkapan 35,0% Harga pipa 7,000.00 7,000.00

Pekerja 0.0810 Oh 45,000.00 3,645.00

Tukang Batu 0.1350 Oh 50,000.00 6,750.00

Kepala Tukang 0.0135 Oh 55,000.00 742.50

Mandor 0.0041 Oh 67,500.00 276.75

Jumlah 42,414.25

Overhead & Profit (10%) 4,241.43

Jumlah Total 46,655.68

Dibulatkan 46,650.00

Page 56: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

40 MEMASANG 1 M' PIPA PVC TIPE AW DIAMETER 4"

Pipa PVC 1.2000 M' 25,000.00 30,000.00

Perlengkapan 35,0% Harga pipa 8,750.00 8,750.00

Pekerja 0.0810 Oh 45,000.00 3,645.00

Tukang Batu 0.1350 Oh 50,000.00 6,750.00

Kepala Tukang 0.0135 Oh 55,000.00 742.50

Mandor 0.0041 Oh 67,500.00 276.75

Jumlah 50,164.25

Overhead & Profit (10%) 5,016.43

Jumlah Total 55,180.68

Dibulatkan 55,180.00

41 1 UNIT SEPTICTANK 2 x 1 x 1,5 M + REMBESANNYA (VOLUME = 3 M3)

Galian tanah 3.0000 M3 35,437.50 106,312.50

Pasir urug 0.1000 M3 134,175.00 13,417.50

Lantai kerja 2.0000 M2 36,922.50 73,845.00

Pas. Bata ad.1 : 3 12.5000 M2 87,221.25 1,090,265.63

Plat beton penutup + balok 0.2000 M3 7,099,762.50 1,419,952.50

Pipa PVC 4" jenis AW + sambungan 5.4000 M1 50,164.25 270,886.95

Pipa GIV 1,5 " 1.2000 M1 11,271.50 13,525.80

Galian tanah untuk rembesan 3.3750 M3 35,437.50 119,601.56

Pas. Injuk 5.4000 Kg 5,000.00 27,000.00

Urugan kerikil 3.5 cm 1.0500 M3 215,000.00 225,750.00

Pipa PVC 4" berlobang jenis AW 9.0000 m1 50,164.25 451,478.25

Urugan tanah perataan 1.1250 M3 12,990.00 14,613.75

Jumlah 3,826,649.44

Overhead & Profit (10%) 382,664.94

Jumlah Total 4,209,314.38

Dibulatkan 4,209,310.00

41 MEMASANG 1 BUAH KRAN DIAMETER 3/4" ATAU 1/2"

Kran Air 1.0000 Bh 17,500.00 17,500.00

Seal Tape 0.0250 Bh 1,500.00 37.50

Pekerja 0.0100 Oh 45,000.00 450.00

Tukang Batu 0.1000 Oh 50,000.00 5,000.00

Kepala Tukang 0.0100 Oh 55,000.00 550.00

Mandor 0.0050 Oh 67,500.00 337.50

Jumlah 23,875.00

Overhead & Profit (10%) 2,387.50

Jumlah Total 26,262.50

Dibulatkan 26,260.00

42 MEMASANG 1 BUAH FLOOR DRAIN

Floor Drain 1.0000 Bh 21,150.00 21,150.00

Pekerja 0.0100 Oh 45,000.00 450.00

Tukang Batu 0.1000 Oh 50,000.00 5,000.00

Kepala Tukang 0.0100 Oh 55,000.00 550.00

Mandor 0.0050 Oh 67,500.00 337.50

Jumlah 27,487.50

Overhead & Profit (10%) 2,748.75

Jumlah Total 30,236.25

Dibulatkan 30,230.00

Page 57: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

43 1 BUAH PASANG KUNCI TANAM BIASA

Kunci Tanam Biasa 1.0000 Bh 145,000.00 145,000.00

Pekerja 0.0100 Oh 45,000.00 450.00

Tukang kayu 0.5000 Oh 50,000.00 25,000.00

Kepala Tukang 0.0100 Oh 55,000.00 550.00

Mandor 0.0050 Oh 67,500.00 337.50

Jumlah 171,337.50

Overhead & Profit (10%) 17,133.75

Jumlah Total 188,471.25

Dibulatkan 188,470.00

44 1 BUAH PASANG ENGSEL PINTU

Engsel Pintu 1.0000 Bh 25,000.00 25,000.00

Pekerja 0.0150 Oh 45,000.00 675.00

Tukang kayu 0.1500 Oh 50,000.00 7,500.00

Kepala Tukang 0.0150 Oh 55,000.00 825.00

Mandor 0.00075 Oh 67,500.00 50.63

Jumlah 34,050.63

Overhead & Profit (10%) 3,405.06

Jumlah Total 37,455.69

Dibulatkan 37,450.00

45 1 BUAH PASANG GRENDEL 15 CM

Grendel 15 cm 1.0000 Bh 37,500.00 37,500.00

Pekerja 0.0190 Oh 45,000.00 855.00

Tukang kayu 0.1870 Oh 50,000.00 9,350.00

Kepala Tukang 0.0182 Oh 55,000.00 1,001.00

Mandor 0.0019 Oh 67,500.00 128.25

Jumlah 48,834.25

Overhead & Profit (10%) 4,883.43

Jumlah Total 53,717.68

Dibulatkan 53,710.00

46 1 M2 PASANG KACA POLOS, TEBAL 5 MM

Kaca 1.1000 M² 105,000.00 115,500.00

Pekerja 0.0150 Oh 45,000.00 675.00

Tukang kayu 0.1500 Oh 50,000.00 7,500.00

Kepala Tukang 0.0150 Oh 55,000.00 825.00

Mandor 0.00075 Oh 67,500.00 50.63

Jumlah 124,550.63

Overhead & Profit (10%) 12,455.06

Jumlah Total 137,005.69

Dibulatkan 137,000.00

Page 58: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

47 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM ANTI SLIP

Keramik 20 x 20 cm 1.0100 M² 48,000.00 48,480.00

Semen Portland 12.0000 Kg 1,375.00 16,500.00

Pasir Pasang 0.0450 M³ 135,000.00 6,075.00

Semen Warna 1.3000 Kg 5,000.00 6,500.00

Pekerja 0.7000 Oh 45,000.00 31,500.00

Tukang Batu 0.3500 Oh 50,000.00 17,500.00

Kepala Tukang 0.0350 Oh 55,000.00 1,925.00

Mandor 0.0350 Oh 67,500.00 2,362.50

Jumlah 130,842.50

Overhead & Profit (10%) 13,084.25

Jumlah Total 143,926.75

Dibulatkan 143,920.00

48 1 M2 PASANG LANTAI KERAMIK WARNA 30 X 30 CM

Keramik 30 x 30 cm 6.630 bh 6,900.00 45,747.00

Semen Portland 9.800 Kg 1,375.00 13,475.00

Pasir Pasang 0.045 M³ 135,000.00 6,075.00

Semen Warna 1.500 Kg 5,000.00 7,500.00

Pekerja 0.700 Oh 45,000.00 31,500.00

Tukang Batu 0.350 Oh 50,000.00 17,500.00

Kepala Tukang 0.035 Oh 55,000.00 1,925.00

Mandor 0.035 Oh 67,500.00 2,362.50

Jumlah 126,084.50

Overhead & Profit (10%) 12,608.45

Jumlah Total 138,692.95

Dibulatkan 138,690.00

49 1 M2 PASANG DINDING KERAMIK 20 X 25 CM

Keramik 20 x 25 cm 1.0100 M² 52,000.00 52,520.00

Semen Portland 9.3000 Kg 1,375.00 12,787.50

Pasir Pasang 0.0180 M³ 135,000.00 2,430.00

Semen Warna 1.5000 Kg 5,000.00 7,500.00

Pekerja 0.1875 Oh 45,000.00 8,437.50

Tukang Batu 0.3750 Oh 50,000.00 18,750.00

Kepala Tukang 0.0750 Oh 55,000.00 4,125.00

Mandor 0.0750 Oh 67,500.00 5,062.50

Jumlah 111,612.50

Overhead & Profit (10%) 11,161.25

Jumlah Total 122,773.75

Dibulatkan 122,770.00

50 1 M' SALURAN PASANGAN BATA 1 : 4 L = 20 CM

Galian tanah biasa mak. Kedalama 1 m 0.1900 M³ 38,980.00 7,406.20

Pasangan Bata merah 1 : 3 0.3800 M² 95,940.00 36,457.20

Plesteran Dinding 1 : 4 + acian 1.1000 M² 72,630.00 79,893.00

Jumlah 123,756.40

Overhead & Profit (10%) 12,375.64

Jumlah Total 136,132.04

Dibulatkan 136,130.00

Page 59: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

51 1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR,

2 LAPIS CAT PENUTUP)

Plamir 0.1000 Kg 13,000.00 1,300.00

Cat Dasar 0.1000 Kg 25,000.00 2,500.00

Cat Penutup 2 x 0.2600 Kg 25,000.00 6,500.00

Ampelas 0.3300 Lbr 3,500.00 1,155.00

Rool cat 0.0067 Bh 20,000.00 134.00

Pekerja 0.0200 Oh 45,000.00 900.00

Tukang Cat 0.0630 Oh 50,000.00 3,150.00

Kepala Tukang 0.0063 Oh 55,000.00 346.50

Mandor 0.0030 Oh 67,500.00 202.50

Jumlah 16,188.00

Overhead & Profit (10%) 1,618.80

Jumlah Total 17,806.80

Dibulatkan 17,800.00

52 1 M2 PENGECATAN PLAFOND BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR,

2 LAPIS CAT PENUTUP)

Plamir 0.1000 Kg 13,000.00 1,300.00

Cat Dasar 0.1000 Kg 25,000.00 2,500.00

Cat Penutup 2 x 0.2600 Kg 25,000.00 6,500.00

Ampelas 0.3300 Lbr 3,500.00 1,155.00

Rool cat 0.0067 Bh 20,000.00 134.00

Pekerja 0.0200 Oh 45,000.00 900.00

Tukang Cat 0.0630 Oh 50,000.00 3,150.00

Kepala Tukang 0.0063 Oh 55,000.00 346.50

Mandor 0.0063 Oh 67,500.00 425.25

Jumlah 16,410.75

Overhead & Profit (10%) 1,641.08

Jumlah Total 18,051.83

Dibulatkan 18,050.00

53 1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR,

2 LAPIS CAT PENUTUP)

Cat meni 0.2000 Kg 25,000.00 5,000.00

Plamir 0.1500 Kg 23,000.00 3,450.00

Cat Dasar 0.1700 Kg 25,000.00 4,250.00

Cat Penutup 2 x 0.2600 Kg 25,000.00 6,500.00

Ampelas 0.2000 Lbr 3,500.00 700.00

Kuas 0.0100 Bh 8,000.00 80.00

Pekerja 0.0700 Oh 45,000.00 3,150.00

Tukang Cat 0.0090 Oh 50,000.00 450.00

Kepala Tukang 0.0060 Oh 55,000.00 330.00

Mandor 0.0030 Oh 67,500.00 202.50

Jumlah 24,112.50

Overhead & Profit (10%) 2,411.25

Jumlah Total 26,523.75

Dibulatkan 26,520.00

Page 60: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

54 1 M2 COATING BATU ANDESIT

batu alam 1.0100 m2 70,000.00 70,700.00

Cat Coating khusus batu alam 0.3500 Kg 65,000.00 22,750.00

Semen Warna 1.5000 Kg 5,000.00 7,500.00

Sikat kawat 0.2600 Bh 12,500.00 3,250.00

Kuas 0.0100 Bh 8,000.00 80.00

Pekerja 0.0250 Oh 45,000.00 1,125.00

Tukang Cat 0.1500 Oh 50,000.00 7,500.00

Kepala Tukang 0.0150 Oh 55,000.00 825.00

Mandor 0.0015 Oh 67,500.00 101.25

Jumlah 113,831.25

Overhead & Profit (10%) 11,383.13

Jumlah 125,214.38

Dibulatkan 125,210.00

55 1 M2 WATER PROOFING

Bahan waterproofing 0.5000 Kg 100,000.00 50,000.00

Pekerja 0.0250 Oh 45,000.00 1,125.00

Tukang Cat 0.0830 Oh 50,000.00 4,150.00

Kepala Tukang 0.0083 Oh 55,000.00 456.50

Mandor 0.0025 Oh 67,500.00 168.75

Jumlah 55,900.25

Overhead & Profit (10%) 5,590.03

Jumlah 61,490.28

Dibulatkan 61,490.00

56 1 UNIT PINTU ALUMINIUM (P3)

Kusen alumunium warna 1,3 7.6000 M' 70,000.00 532,000.00

Daun pintu alumunium warna 1,3 mm 11.4000 M' 70,000.00 798,000.00

Engsel Pintu 6.0000 Bh 25,000.00 150,000.00

Kunci Tanam 1.0000 Bh 145,000.00 145,000.00

handle Stainlees 2.0000 set 240,000.00 480,000.00

multiplek 9 mm (bahan kamper) finish plitur 2.0000 M2 145,000.00 290,000.00

Door Closer 2.0000 set 255,000.00 510,000.00

Skrup fixer 7.6000 bh 1,000.00 7,600.00

Sealant 38.0000 M' 2,000.00 76,000.00

Upah Pasang 0.2000 Ls 2,988,600.00 597,720.00

Jumlah 3,586,320.00

Overhead & Profit (10%) 358,632.00

Jumlah Total 3,944,952.00

Dibulatkan 3,944,950.00

1 UNIT PINTU ALUMINIUM (PU)

Besi hollow 40x40 20.8000 M' 32,500.00 676,000.00

Daun pintu kaca 12mm (frame less) 3.8000 M2 328,000.00 1,246,400.00

Handle stainless 1.0000 set 125,000.00 125,000.00

Floorhinge 2.0000 set 800,000.00 1,600,000.00

Patch pitting 4.0000 Bh 78,000.00 312,000.00

Skrup fixer 9.0000 Bh 3,000.00 27,000.00

Kunci khusus kusen alumunium 1.0000 Bh 130,300.00 130,300.00

Stainless sheet 4.6240 M2 128,000.00 591,872.00

Ongkos pasang 0.200 Ls 4,708,572.00 941,714.40

Jumlah 5,650,286.40

Overhead & Profit (10%) 565,028.64

Jumlah Total 6,215,315.04

Dibulatkan 6,215,310.00

Page 61: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

57 1 UNIT PINTU ALUMINIUM (P1)

Kusen Alumunium Warna 1,3mm 6.8800 m' 70,000.00 481,600.00

rangka Daun pintu panel 5.5400 m' 70,000.00 387,800.00

daun pintu multiplek 9 mm (bahan kamper) finish plitur 1.3460 m2 145,000.00 195,170.00

Kunci tanam 2 slaag 1.0000 bh 145,000.00 145,000.00

Engsel Pintu 3.0000 bh 25,000.00 75,000.00

Skrup fixer 6.8800 bh 1,000.00 6,880.00

Sealant 6.8800 M' 2,000.00 13,760.00

Upah Pasang 0.2000 ls 1,305,210.00 261,042.00

Jumlah 1,566,252.00

Overhead & Profit (10%) 156,625.20

Jumlah Total 1,722,877.20

Dibulatkan 1,722,870.00

58 1 UNIT PINTU ALUMINIUM (P7)

Kusen alumunium warna 1,3 7.6000 M' 70,000.00 532,000.00

Daun pintu alumunium warna 1,3 mm 11.4000 M' 70,000.00 798,000.00

Engsel Pintu 6.0000 Bh 25,000.00 150,000.00

Kunci Tanam 1.0000 Bh 145,000.00 145,000.00

handle Stainlees 2.0000 set 240,000.00 480,000.00

Kaca polos 5 mm 2.0000 M2 105,000.00 210,000.00

Door Closer 2.0000 set 255,000.00 510,000.00

Skrup fixer 7.6000 bh 1,000.00 7,600.00

Sealant 38.0000 M' 2,000.00 76,000.00

Upah Pasang 0.2000 Ls 2,908,600.00 581,720.00

Jumlah 3,490,320.00

Overhead & Profit (10%) 349,032.00

Jumlah Total 3,839,352.00

Dibulatkan 3,839,350.00

59 1 UNIT JENDELA ALUMINIUM (J3)

Kusen alumunium warna 1,3 5.7000 M' 70,000.00 399,000.00

Daun jendela alumunium warna 1,3 4.1200 M' 70,000.00 288,400.00

Kaca polos 5 mm 1.600 M2 105,000.00 168,000.00

Skrup fixer 5.700 bh 1,000.00 5,700.00

Sealant 9.820 M' 2,000.00 19,640.00

Tralis 1.300 m2 350,000.00 455,000.00

Ongkos pasang 0.050 Ls 1,335,740.00 66,787.00

Jumlah 1,402,527.00

Overhead & Profit (10%) 140,252.70

Jumlah Total 1,542,779.70

Dibulatkan 1,542,770.00

60 1 UNIT JENDELA ALUMINIUM (J2)

Kusen alumunium warna 1,3 9.6000 M' 70,000.00 672,000.00

Daun jendela alumunium warna 1,3 7.0000 M' 70,000.00 490,000.00

Kaca polos 5 mm 1.6360 M2 105,000.00 171,780.00

Skrup fixer 8.000 bh 1,000.00 8,000.00

Sealant 9.600 M' 2,000.00 19,200.00

Kait Angin Alumunium 2.000 m2 75,000.00 150,000.00

Ongkos pasang 0.200 Ls 1,510,980.00 302,196.00

Jumlah 1,813,176.00

Overhead & Profit (10%) 181,317.60

Jumlah Total 1,994,493.60

Dibulatkan 1,994,490.00

Page 62: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

61 1 UNIT JENDELA ALUMINIUM (J1)

Kusen Alumunium Warna 1,3mm 8.8800 m' 70,000.00 621,600.00

Daun jendela alumuium warna 1,3 mm 4.4880 m' 70,000.00 314,160.00

Skrup fixer 10.0000 Bh 1,000.00 10,000.00

Kait Angin Alumunium 2.0000 set 75,000.00 150,000.00

Kaca polos 5 mm 1.874 m2 105,000.00 196,761.60

Sealant 8.880 M' 2,000.00 17,760.00

0.200 Ls 1,310,281.60 262,056.32

Jumlah 1,572,337.92

Overhead & Profit (10%) 157,233.79

Jumlah Total 1,729,571.71

Dibulatkan 1,729,570.00

62 1 UNIT BOUVENLIGHT (BV1)

Kusen alumunium warna 1,3 2.3200 M' 70,000.00 162,400.00

Kaca polos 5 mm 0.2400 M2 105,000.00 25,200.00

Skrup fixer 2.3200 bh 1,000.00 2,320.00

Sealant 2.5600 M' 2,000.00 5,120.00

Ongkos pasang 0.1500 Ls 195,040.00 29,256.00

Jumlah 224,296.00

Overhead & Profit (10%) 22,429.60

Jumlah Total 246,725.60

Dibulatkan 246,720.00

63 1 M2 PEKERJAAN KONSTRUKSI BAJA RINGAN ( BERSERTIFIKAT DAN BERGARANSI)

Main truss C-80 -75 t. 0.75 mm 2.8000 m' 13,500.00 37,800.00

Roof Bottom/Reng R 33-0.45 5.1000 m' 9,500.00 48,450.00

Self Drilling Screw dia-6 x 20 mm ( Truss Screw) 25.0000 Bh 375.00 9,375.00

Self Drilling Screw dia-4 x 16 mm ( Roof Batten Screw) 35.0000 Bh 350.00 12,250.00

Dynabol dia- 12 x 120 mm 1.0000 Bh 1,750.00 1,750.00

Tukang 0.2470 oh 55,000.00 13,585.00

Tukang Besi Profil 0.1760 oh 55,000.00 9,680.00

Kepala Tukang Besi Profil 0.1170 oh 65,000.00 7,605.00

Mandor 0.0117 oh 67,500.00 789.75

Alat Bantu ( Mesin Bor Listril) /Genset 0.0500 ls 7,064.24 353.21

Jumlah 141,637.96

Overhead & Profit (10%) 14,163.80

Jumlah Total 155,801.76

Dibulatkan 155,800.00

1M2 PEKERJAAN PASANGAN GENTENG MORANDO NATURAL JTW

Genteng Morando Natural Jtw. 20.000 Bh 3,800.00 76,000.00

Pekerja 0.1200 Oh 45,000.00 5,400.00

Tukang kayu 0.0600 Oh 50,000.00 3,000.00

Kepala tukang 0.0060 Oh 55,000.00 330.00

Mandor 0.0060 Oh 67,500.00 405.00

Jumlah 85,135.00

Overhead & Profit (10%) 8,513.50

Jumlah Total 93,648.50

Dibulatkan 93,640.00

1M2 PEKERJAAN PASANGAN NOK GENTENG MORANDO NATURAL JTW

Nok Genteng Morando Natural Jtw. 10.0000 bh 5,000.00 50,000.00

Pasir Pasang 0.210 m3 135,000.00 28,350.00

Semen PC 6.520 Kg 1,375.00 8,965.00

Pekerja 0.150 Oh 45,000.00 6,750.00

Tukang kayu 0.200 Oh 50,000.00 10,000.00

Kepala tukang 0.010 Oh 55,000.00 550.00

Ongkos pasang

Page 63: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

Mandor 0.010 Oh 67,500.00 675.00

Jumlah 105,290.00

Overhead & Profit (10%) 10,529.00

Jumlah Total 115,819.00

Dibulatkan 115,810.00

Page 64: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

64 1 M2 PEKERJAAN GENTENG METAL ROOF LAPIS PASIR KWARSA

Genteng Metal Pasir Kwarsa 2x4 Setara Prima roof 1.6200 lbr 45,000.00 72,900.00

Paku Biasa 2-5 " 30.0000 Pcs 90.00 2,700.00

Tukang 0.2000 oh 55,000.00 11,000.00

Tukang Besi Profil 0.1000 oh 55,000.00 5,500.00

Kepala Tukang Besi Profil 0.0100 oh 65,000.00 650.00

Mandor 0.0100 oh 67,500.00 675.00

Jumlah 93,425.00

Overhead & Profit (10%) 9,342.50

Jumlah Total 102,767.50

Dibulatkan 102,760.00

65 1 M' PEKERJAAN NOK GENTENG METAL SHEET LAPIS PASIR KWARSA

Nok Genteng Metal Pasir Kwarsa Profil U Setara Prima roof 1.2000 Lbr 40,000.00 48,000.00

Paku Biasa 2-5 " 16.0000 Pcs 90.00 1,440.00

Tukang 0.1500 oh 55,000.00 8,250.00

Tukang Besi Profil 0.0700 oh 55,000.00 3,850.00

Kepala Tukang Besi Profil 0.0080 oh 65,000.00 520.00

Mandor 0.0080 oh 67,500.00 540.00

Jumlah 62,600.00

Overhead & Profit (10%) 6,260.00

Jumlah Total 68,860.00

Dibulatkan 68,860.00

Page 65: RAB PAGAR.xls

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

Kegiatan : Pengembangan Sarana dan Prasarana Kewilayahan

Pekerjaan : Pembangunan Gedung Satpas T.300

Lokasi : Kabupaten Lebak

Anggaran : Tahun Anggaran 2014

NO U R A I A N KOEFISIENHARGA SATUAN

(Rp.)

JUMLAH HARGA(Rp.)

66 1 BH PINTU BESI type PJ1-A

158.4000 kg Rp 11,750 1,861,200.00

79.2084 kg Rp 11,750 930,698.70

Engsel pintu 4.0000 bh Rp 50,000 200,000.00

1.0000 bh Rp 26,104 26,104.17

1.0000 bh Rp 52,208 52,208.33

12.0000 bh Rp 29,833 358,000.00

Kunci gembok 1.0000 bh Rp 150,000 150,000.00

Jumlah 3,578,211.20

Overhead & Profit (10%) 357,821.12

Jumlah Total 3,936,032.32

Dibulatkan 3,936,030.00

67 1 BH PINTU BESI type PJ1-B

191.2000 kg Rp 11,750 2,246,600.00

110.9752 kg Rp 11,750 1,303,958.60

Engsel pintu 2.0000 bh Rp 50,000 100,000.00

1.0000 bh Rp 26,104 26,104.17

1.0000 bh Rp 52,208 52,208.33

12.0000 bh Rp 29,833 358,000.00

Kunci gembok 1.0000 bh Rp 150,000 150,000.00

Jumlah 4,236,871.10

Overhead & Profit (10%) 423,687.11

Jumlah Total 4,660,558.21

Dibulatkan 4,660,550.00

68 1 BH PINTU BESI type PJ1-C

186.4000 kg Rp 11,750 2,190,200.00

110.9752 kg Rp 11,750 1,303,958.60

Engsel pintu 2.0000 bh Rp 50,000 100,000.00

1.0000 bh Rp 26,104 26,104.17

1.0000 bh Rp 52,208 52,208.33

12.0000 bh Rp 29,833 358,000.00

Kunci gembok 1.0000 bh Rp 150,000 150,000.00

Jumlah 4,180,471.10

Overhead & Profit (10%) 418,047.11

Jumlah Total 4,598,518.21

Dibulatkan 4,598,510.00

69 1 Unit Kusen Bouvenligh Tralis BV2

Plat strip 50x8mm 1.0880 m2 Rp 65,000 70,720.00

Besi dia. 16 mm 13.1400 kg Rp 11,750 154,395.00

Angkur besi dia. 16 mm 4.0000 Bh Rp 29,833 119,333.33

Jumlah 344,448.33

Overhead & Profit (10%) 34,444.83

Jumlah Total 378,893.17

Dibulatkan 378,890.00

70 1 Unit Kusen Bouvenligh Tralis BV3

Plat strip 50x8mm 2.7000 m2 Rp 65,000 175,500.00

Besi dia. 16 mm 26.8200 kg Rp 11,750 315,135.00

Angkur besi dia. 16 mm 14.0000 Bh Rp 29,833 417,666.67

Jumlah 908,301.67

Overhead & Profit (10%) 90,830.17

Jumlah Total 999,131.83

Dibulatkan 999,130.00

Besi UNP 140.60.7 Besi dia. 16 mm Pegangan pintu besi beton dia. 22 mm Sloot pintu besi beton dia. 16 mm Angkur besi dia. 16 mm

Besi UNP 140.60.7 Besi dia. 16 mm Pegangan pintu besi beton dia. 22 mm Sloot pintu besi beton dia. 16 mm Angkur besi dia. 16 mm

Besi UNP 140.60.7 Besi dia. 16 mm Pegangan pintu besi beton dia. 22 mm Sloot pintu besi beton dia. 16 mm Angkur besi dia. 16 mm

Page 66: RAB PAGAR.xls

ANALISA PERHITUNGAN BETON BERTULANG

NO. URAIAN HASIL ANALISA HARGA

1 Hasil Analisa Pekerjaan Cor Beton Site Mix K-175 899,150.00 2 Hasil Analisa Pekerjaan Cor Beton Site Mix K-225 964,250.00 3 Hasil Analisa Pekerjaan Besi Beton U. 24 14,740.00 4 Pekerjaan bekisting untuk pondasi 89,630.00 5 Pekerjaan bekisting untuk sloof 94,300.00 6 Pekerjaan bekisting untuk kolom 152,280.00 7 Pekerjaan bekisting untuk balok 152,280.00 8 Pekerjaan bekisting untuk lantai 207,280.00

1 Pondasi Tapak 60x60, Bekisting Kayu kelas IIIBeton Sitemix K-225 ( A057 ) 964,250.00 Besi beton 734,641.60 Bekisting 358,520.00

J u m l a h 2,057,411.60

2 Sloof 15x20, Bekisting Kayu kelas IIIBeton Sitemix K-225 ( A057 ) 964,250.00 Besi beton 2,524,470.67 Bekisting 1,257,333.33

J u m l a h 4,746,054.00

3 Kolom 12x12 Bekisting Kayu kelas IIIBeton Sitemix K-225 ( A057 ) 964,250.00 Besi beton 5,545,925.00 Bekisting 2,030,400.00

J u m l a h 8,540,575.00

4 Kolom 25x25 Bekisting Kayu kelas IIIBeton Sitemix K-225 ( A057 ) 964,250.00 Besi beton 1,277,781.12 Bekisting 1,218,240.00

J u m l a h 3,460,271.12

5 Kolom 20x20 Bekisting kayu kelas IIIBeton Sitemix K-225 ( A056 ) 964,250.00 Besi beton 2,685,259.50 Bekisting 1,522,800.00

J u m l a h 5,172,309.50

6 Balok 15x30 Bekisting kayu kelas IIIBeton Sitemix K-225 ( A056 ) 964,250.00 Besi beton 1,803,930.33 Bekisting 1,353,600.00

J u m l a h 4,121,780.33

7 Balok 15x30 Bekisting kayu kelas IIIBeton Sitemix K-225 ( A056 ) 964,250.00 Besi beton 3,408,379.33 Bekisting 1,015,200.00

J u m l a h 5,387,829.33

Page 67: RAB PAGAR.xls

8 Ring Balok 15x20 Bekisting kayu kelas IIIBeton Sitemix K-225 ( A056 ) 964,250.00 Besi beton 2,558,864.00 Bekisting 1,015,200.00

J u m l a h 4,538,314.00

9 Balok LINTEL 10x12 Bekisting kayu kelas IIIBeton Sitemix K-225 ( A056 ) 964,250.00 Besi beton 5,726,490.00 Bekisting 1,142,100.00

J u m l a h 7,832,840.00

10 Balok 30x30 Bekisting kayu kelas IIIBeton Sitemix K-175 ( A056 ) 964,250.00 Besi beton 1,803,930.33 Bekisting 1,522,800.00

J u m l a h 4,290,980.33

11 Pelat Dak Beton T=20 cm Sitemix, Bekisting kayu kelas IIIBeton Sitemix K-225 ( A057 ) 964,250.00 Besi beton 4,062,712.50 Bekisting 2,072,800.00

J u m l a h 7,099,762.50 12 Pelat lantai T=10 cm Sitemix, Bekisting kayu kelas III

Beton Sitemix K-225 ( A057 ) 964,250.00

Besi beton 866,712.00

Bekisting 2,072,800.00

J u m l a h 3,903,762.00

Page 68: RAB PAGAR.xls

PERHITUNGAN BERAT BESI BETON DALAM 1 M3

BESI BETON POLOS BESI BETON SPIRAL

No Diameter Berat Besi No Diameter Berat Besi No. Diameter Berat Besi mm Kg / m1 mm Kg / m1 mm Kg / m1

1 4.0 0.130 11 12 0.890 1 10.00 0.622 5.0 0.120 12 13 1.040 2 13.00 1.043 5.5 0.190 13 14 1.210 3 16.00 1.584 5.7 0.200 14 16 1.580 4 19.00 2.235 6.0 0.220 15 19 2.230 5 22.00 2.986 6.5 0.310 16 22 2.980 6 25.00 3.857 8.0 0.400 17 23 3.260 7 29.00 5.198 9.0 0.530 18 25 3.850 8 32.00 6.319 10.0 0.620 19 28 4.830 9 36.00 7.9910 11.0 0.750 20 31 5.930

21 32 6.310

1. Pondasi Tapak 70 X 70 T = 30 cm, pakai tulangan Ø12 - 15Luas dalam 1 m3 = 3.33 m2Besi = 49.84 kg

BERAT BESI BETON = 49.84 kg/m3

2 Sloof 15 X 20 cm, pakai tulangan 4 Ø 12, beugel Ø8 - 20Panjang dalam 1 m3 = 33.33 m1Besi = 124.60 kgBesi beugel = 46.67 kg

BERAT BESI BETON = 171.27 kg/m3

3 Kolom 12 X 12 cm, pakai tulangan 4 Q 12, beugel Ø8 - 20Panjang dalam 1 m3 = 69.44 m1Besi = 259.58 kgBesi beugel = 116.67 kg

BERAT BESI BETON = 376.25 kg/m3

4 Kolom 25 X 25 cm, pakai tulangan 4 Ø 12, beugel Ø8 - 20Panjang dalam 1 m3 = 16.00 m1Besi = 59.81 kgBesi beugel = 26.88 kg

BERAT BESI BETON = 86.69 kg/m3

5 Balok 15 X 20 cm, pakai tulangan 4 Ø 12, beugel Ø8 - 20Panjang dalam 1 m3 = 33.33 m1Besi = 124.60 kgBesi beugel = 49.00 kg

BERAT BESI BETON = 173.60 kg/m3

Page 69: RAB PAGAR.xls

6 Kolom 20 X 20 cm, pakai tulangan 4 Ø12, beugel Ø8 - 20Panjang dalam 1 m3 = 25.00 m1Besi = 140.18 kgBesi beugel = 42.00 kg

BERAT BESI BETON = 182.18 kg/m3

7 Balok 30 X 30 cm, pakai tulangan 9 Ø 12, beugel Ø10 - (15-20)Panjang dalam 1 m3 = 11.11 m1Besi = 93.45 kgBesi beugel = 28.93 kg

BERAT BESI BETON = 122.38 kg/m3

8 Balok 15 X 30 cm, pakai tulangan 8 Ø12, beugel Ø10 - (15-20)Panjang dalam 1 m3 = 22.22 m1Besi = 166.13 kgBesi beugel = 65.10 kg

BERAT BESI BETON = 231.23 kg/m3

9 Balok lintel 10 X 12 cm, pakai tulangan 4 Ø12, beugel Ø8 - 20Panjang dalam 1 m3 = 83.33 m1Besi = 311.50 kgBesi beugel = 77.00 kg

BERAT BESI BETON = 388.50 kg/m3

10 Plat beton t = 8 cm pakai tulangan Φ8 - 20 cm (1 lapis)Luas dalam 1 m3 = 12.50 m2Panjang besi = 131.25 m1Besi dia. 8 - 15 cm = 55.13 kg

BERAT BESI BETON = 55.13 kg/m3

11 Plat Lantai t = 20 cm pakai tulangan Φ10 - 15 cm (2 lapis)Luas dalam 1 m3 = 10.00 m2Panjang besi = 350.00 m1Besi dia. 8 - 15 cm = 275.63 kg

BERAT BESI BETON = 275.63 kg/m3

12 Plat Lantai t = 10 cm pakai tulangan Φ8 - 15 cm (1 lapis)Luas dalam 1 m3 = 10.00 m2Panjang besi = 140.00 m1Besi dia. 8 - 15 cm = 58.80 kg

BERAT BESI BETON = 58.80 kg/m3

Page 70: RAB PAGAR.xls

REKAPITULASI RINCIAN ANGGARAN BIAYA ###

Kegiatan : …………………………………………………Pekerjaan : Pembangunan Pagar depan Gedung Satpas T.300Lokasi : Kabupaten LebakAnggaran : Tahun Anggaran 2014

NO. URAIAN PEKERJAAN JUMLAH (Rp.)NO. URAIAN PEKERJAAN ###A. PEKEERJAAN JALAN UNTUK UJI PRAKTEK 110,686,203.82 B. PEMBANGUNAN PAGAR P : 25 M T. 1,2 M #REF!I. PEKERJAAN PERSIAPAN 1,278,450.00

II. PEKERJAAN TANAH DAN URUGAN 468,000.00 III. PEKERJAAN PONDASI DAN BETON 6,642,242.19 IV. PEKERJAAN DINDING DAN PLESTERAN #REF! V. PEKERJAAN LANTAI #REF! VI. PEKERJAAN PINTU PAGAR 3,408,930.00 VII. PEKERJAAN PENGECATAN 3,294,060.40

REAL COST #REF! PPN (Pajak Pertambahan Nilai) 10% #REF! JUMLAH TOTAL #REF! DIBULATKAN #REF!

Terbilang : ###

Pandeglang, April 2014

Konsultan Perencana,PT. MITRA DESIGN ENGINEERING

YAYAH FAOZIAH, S.PiDirektur Utama

Page 71: RAB PAGAR.xls

RINCIAN ANGGARAN BIAYA (RAB)

Kegiatan : …………………………………………………Pekerjaan : Pembangunan Pagar depan Gedung Satpas T.300Lokasi : Kabupaten LebakAnggaran : Tahun Anggaran 2014

NO. URAIAN PEKERJAAN VOLUME1 2 3 4 5

A. PEMBANGUNAN PAGAR P : 25 M T. 1,2 M ###I. PEKERJAAN PERSIAPAN

1 Pek. Pengukuran & Pasangan Bouwplank 27.00 m1 47,350.00 1,278,450.00 Jumlah I 1,278,450.00

II. PEKERJAAN TANAH DAN URUGAN ###1 Pek. Galian tanah pondasi 8.25 m3 38,980.00 321,585.00 2 Pek. Urugan tanah kembali 2.75 m3 12,990.00 35,722.50 3 Pek. Urugan pasir dibawah pondasi 0.75 m3 147,590.00 110,692.50

Jumlah II 468,000.00 III. PEKERJAAN PONDASI DAN BETON ###

1 Pas. Pondasi batu kali ad. 1 : 4 4.38 m3 667,160.00 2,918,825.00 2 Pek. Sloof 12/15 beton Site Mix K.225 0.45 m3 4,746,054.00 2,135,724.30 3 Pek. Kolom praktis 13/13 beton Site Mix K.225 0.19 m3 8,540,575.00 1,587,692.89

Jumlah III 6,642,242.19 IV. PEKERJAAN DINDING DAN PLESTERAN ###

1 25.20 m2 89,590.00 2,257,668.00 2 50.40 m2 #REF! #REF!

3 47.00 bh 52,500.00 2,467,500.00

Jumlah IV #REF!V. PEKERJAAN LANTAI ###

1 Dinding Keramik 30X30 warna polos 10.76 m2 #REF! #REF! Jumlah V #REF!

VI. PEKERJAAN PINTU PAGAR ###1 Pek. Pintu Pagar Bahan Hollow + Plat besi 8.40 m2 405,825.00 3,408,930.00

Jumlah VI 3,408,930.00 VII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Catylac 39.64 m2 53,710.00 2,129,064.40 2 Pek. Pengecatan pintu pagar 8.40 m2 138,690.00 1,164,996.00

Jumlah VII 3,294,060.40 TOTAL … #REF!

HARGA SATUAN(Rp.)

J U M L A H(Rp.)

Pek. Dinding 1/2 bata ad. 1:5 Pek. Plesteran Dinding + acian

Pek. Huruf ACRYLIC" GEDUNG SATUAN PELAYANAAN ADMINISTRASI SIM POLRES LEBAK" t. 15 cm

Page 72: RAB PAGAR.xls

REKAPITULASI RINCIAN ANGGARAN BIAYA

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi SDN CENING 1Lokasi : Kecamatan Cikedal - Kabupaten PandeglangAnggaran : DAK TH. 2011 (Luncuran)

NO. URAIAN PEKERJAAN JUMLAH (Rp.)

A. REHABILITASI 4 (EMPAT) R. KELAS, R. GURU DAN KM

I. PEKERJAAN PERSIAPAN 4,615,680.00

II. PEKERJAAN TANAH DAN URUGAN 115,943.67

III. PEKERJAAN PONDASI DAN BETON #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN #REF!

V. PEKERJAAN LANTAI #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA 75,847,600.00

VIII. PEKERJAAN ATAP DAN PLAFOND #REF!

IX. PEKERJAAN PENGECATAN 99,561,494.40

X. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE #REF!

B. REHABILITASI 1 (SATU) RUANG KELAS

I. PEKERJAAN PERSIAPAN 500,000.00

II. PEKERJAAN PONDASI DAN BETON #REF!

III. PEKERJAAN DINDING DAN PLESTERAN #REF!

IV. PEKERJAAN LANTAI #REF!

V. PEKERJAAN KUSEN PINTU DAN JENDELA 16,687,420.00

VI. PEKERJAAN ATAP DAN PLAFOND #REF!

VII. PEKERJAAN PENGECATAN 28,534,901.10

VIII. REHABILITASI 2 (DUA) RUANG KELAS #REF!

C. REHABILITASI 2 (DUA) RUANG KELAS

I. PEKERJAAN PERSIAPAN 1,000,000.00

II. PEKERJAAN TANAH DAN URUGAN 77,457.30

III. PEKERJAAN PONDASI DAN BETON #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN #REF!

V. PEKERJAAN LANTAI #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA 42,084,840.00

VII. PEKERJAAN ATAP DAN PLAFOND #REF!

VIII. PEKERJAAN PENGECATAN 42,939,670.60

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE #REF!

D. PEKERJAAN PAVING BLOCK -

REAL COST #REF!

PPN 10% #REF!

JUMLAH TOTAL #REF!

DIBULATKAN #REF!

Terbilang : " Lima Ratus Delapan Puluh Delapan Juta Rupiah "

Pandeglang, Juni 2012

Konsultan PerencanaPT. DECO MULTI PILAR

HAKIMIS, STDirektur Utama

Page 73: RAB PAGAR.xls

RINCIAN ANGGARAN BIAYA (RAB)

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi SDN CENING 1Lokasi : Kecamatan Cikedal - Kabupaten PandeglangAnggaran : DAK TH. 2011 (Luncuran)

NO. URAIAN PEKERJAAN VOLUME

1 2 3 4 5

A. REHABILITASI 4 (EMPAT) R. KELAS, R. GURU DAN KM

I. PEKERJAAN PERSIAPAN

1 Pek. Papan nama proyek 1.00 bh 365,680.00 365,680.00

2 Pek. Bongkaran 1.00 ls 2,500,000.00 2,500,000.00

3 Biaya Dokumentasi dan Pelaporan 1.00 ls 1,750,000.00 1,750,000.00

Jumlah I 4,615,680.00

II. PEKERJAAN TANAH DAN URUGAN

1 Pek. Galian tanah pondasi teras 2.20 m3 38,980.00 85,950.90

2 Pek. Urugan tanah kembali 1.31 m3 12,990.00 16,975.33

3 Pek. Urugan pasir dibawah pondasi teras 0.09 m3 147,590.00 13,017.44

Jumlah II 115,943.67

III. PEKERJAAN PONDASI DAN BETON

1 Pas. Pondasi batu kali ad. 1:5 teras 0.81 m3 #REF! #REF!

2 Pek. Kolom teras 15/20 beton Site Mix K.175 0.45 m3 #REF! #REF!

3 Pek. Balok teras 15/20 beton Site Mix K.175 1.21 m3 #REF! #REF!

4 Pek. Balok lintel 10/12 beton Site Mix K.175 1.07 m3 #REF! #REF!

5 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 3.29 m3 #REF! #REF!

Jumlah III #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN

1 Pek. Dinding bata ad. 1:5 16.00 m2 89,590.00 1,433,440.00

2 Pek. Plesteran dinding ad. 1:5 + acian 32.00 m2 46,330.00 1,482,560.00

3 Pek. Plesteran beton ad 1:3 + acian 32.68 m2 #REF! #REF!

4 Pek. Dinding dan kolom teras keramik 20/25 38.00 m2 26,260.00 997,880.00

Jumlah IV #REF!

V. PEKERJAAN LANTAI

1 Perbaikan Lantai keramik 30x30 cm setara KW II 24.00 m2 #REF! #REF!

Jumlah V #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA 1 Pek. Kusen Alumunium warna P1 5.00 bh 2,951,550.00 14,757,750.00 2 Pek. Kusen Alumunium warna J1 8.00 bh 2,891,960.00 23,135,680.00

3 Pek. Kusen Alumunium warna J2 14.00 bh 2,650,650.00 37,109,100.00

4 Pek. Kusen Alumunium warna BV3 1.00 bh 537,070.00 537,070.00

5 Pek. Kusen pintu PVC 1.00 bh 308,000.00 308,000.00

Jumlah VI 75,847,600.00

VIII. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 460.18 m2 #REF! #REF!

2 Pek. Genteng metal lapis pasir 460.18 m2 #REF! #REF!

3 Pek. Nok genteng metal lapis pasir 46.20 m' #REF! #REF!

4 Pek. Flashing listplank metal lapis pasir 24.00 m' #REF! #REF!

5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 394.20 m2 5,565,210.00 2,193,805,782.00

6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 82.90 m' #REF! #REF!

7 Pek. List plafond profil kayu 388.50 m' #REF! #REF!

8 Pek. Talang miring seng BJLS 28 11.10 m' #REF! #REF!

Jumlah VIII #REF!

IX. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 740.55 m2 53,710.00 39,774,940.50

2 Pek. Pengecatan plafond sek. Decoplus 394.20 m2 143,920.00 56,733,264.00

3 Pek. Pengecatan listplank sek. Glotex 24.87 m2 122,770.00 3,053,289.90

Jumlah IX 99,561,494.40

HARGA SATUAN(Rp.)

J U M L A H(Rp.)

Page 74: RAB PAGAR.xls

1 2 3 4 5

X. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE

1 Pas. Instalasi titik lampu 26.00 titik #REF! #REF!

2 Pas. Instalasi titik stop kontak 5.00 titik #REF! #REF!

3 Pas. Saklar tunggal broco 2.00 bh #REF! #REF!

4 Pas. Saklar ganda broco 5.00 bh #REF! #REF!

5 Pas. Stop kontak broco 5.00 bh #REF! #REF!

6 Pas. Lampu PLC 8 watt philips 26.00 bh #REF! #REF!

7 Pas. Panel MCB 5x10 A 1.00 bh #REF! #REF!

Jumlah X #REF!

Jumlah A #REF!

B. REHABILITASI 1 (SATU) RUANG KELAS

I. PEKERJAAN PERSIAPAN

1 Pek. Bongkaran 1.00 ls 500,000.00 500,000.00

Jumlah I 500,000.00

II. PEKERJAAN PONDASI DAN BETON

1 Pek. Balok lintel 10/12 beton Site Mix K.175 m3 #REF! #REF!

2 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 1.01 m3 #REF! #REF! Jumlah II #REF!

III. PEKERJAAN DINDING DAN PLESTERAN 1 Pek. Dinding bata ad. 1:5 14.00 m2 89,590.00 1,254,260.00 2 Pek. Plesteran dinding ad. 1:5 + acian 28.00 m2 46,330.00 1,297,240.00 3 Pek. Plesteran beton ad 1:3 + acian 6.00 m2 #REF! #REF!4 Pek. Dinding dan kolom teras keramik 20/25 11.64 m2 26,260.00 305,666.40

Jumlah III #REF!IV. PEKERJAAN LANTAI

1 Perbaikan Lantai keramik 30x30 cm setara KW II 14.40 m2 #REF! #REF! Jumlah IV #REF!

V. PEKERJAAN KUSEN PINTU DAN JENDELA 1 Pek. Kusen Alumunium warna P1 1.00 bh 2,951,550.00 2,951,550.00 2 Pek. Kusen Alumunium warna J1 2.00 bh 2,891,960.00 5,783,920.00 3 Pek. Kusen Alumunium warna J2 3.00 bh 2,650,650.00 7,951,950.00

Jumlah V 16,687,420.00 VI. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 121.20 m2 #REF! #REF!2 Pek. Genteng metal lapis pasir 121.20 m2 #REF! #REF!3 Pek. Nok genteng metal lapis pasir 10.00 m' #REF! #REF!4 Pek. Flashing listplank metal lapis pasir 24.00 m' #REF! #REF!5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 108.60 m2 5,565,210.00 604,381,806.00 6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 44.50 m' #REF! #REF!7 Pek. List plafond profil kayu 127.70 m' #REF! #REF!

Jumlah VI #REF!VII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 209.76 m2 53,710.00 11,266,209.60 2 Pek. Pengecatan plafond sek. Decoplus 108.60 m2 143,920.00 15,629,712.00 3 Pek. Pengecatan listplank sek. Glotex 13.35 m2 122,770.00 1,638,979.50

Jumlah VII 28,534,901.10 VIII. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE

1 Pas. Instalasi titik lampu 5.00 titik #REF! #REF!2 Pas. Instalasi titik stop kontak 1.00 titik #REF! #REF!3 Pas. Saklar tunggal broco 1.00 bh #REF! #REF!4 Pas. Saklar ganda broco 1.00 bh #REF! #REF!5 Pas. Stop kontak broco 1.00 bh #REF! #REF!6 Pas. Lampu PLC 8 watt philips 5.00 bh #REF! #REF!7 Pas. Panel MCB 5x10 A 1.00 bh #REF! #REF!

Jumlah VIII #REF! Jumlah B #REF!

C. REHABILITASI 2 (DUA) RUANG KELAS I. PEKERJAAN PERSIAPAN

1 Pek. Bongkaran 1.00 ls 1,000,000.00 1,000,000.00 Jumlah I 1,000,000.00

II. PEKERJAAN TANAH DAN URUGAN 1 Pek. Galian tanah pondasi teras 1.47 m3 38,980.00 57,300.60 2 Pek. Urugan tanah kembali 0.87 m3 12,990.00 11,301.30 3 Pek. Urugan pasir dibawah pondasi teras 0.06 m3 147,590.00 8,855.40

Jumlah II 77,457.30

Page 75: RAB PAGAR.xls

1 2 3 4 5

III. PEKERJAAN PONDASI DAN BETON

1 Pas. Pondasi batu kali ad. 1:5 teras 0.54 m3 #REF! #REF!

2 Pek. Kolom teras 15/20 beton Site Mix K.175 0.30 m3 #REF! #REF!

3 Pek. Balok lintel 10/12 beton Site Mix K.175 0.38 m3 #REF! #REF!

4 Pek. Balok teras 15/20 beton Site Mix K.175 0.66 m3 #REF! #REF!

5 Pek. Balok diatas folding gate 15/20 beton Site Mix K.175 0.21 m3 #REF! #REF!

6 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 1.47 m3 #REF! #REF!

Jumlah III #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN

1 Pek. Dinding bata ad. 1:5 44.10 m2 89,590.00 3,950,919.00

2 Pek. Plesteran dinding ad. 1:5 + acian 171.32 m2 46,330.00 7,937,070.28

3 Pek. Plesteran beton ad 1:3 + acian 19.10 m2 #REF! #REF!

4 Pek. Dinding dan kolom teras keramik 20/25 19.92 m2 26,260.00 523,099.20

Jumlah IV #REF!

V. PEKERJAAN LANTAI

1 Perbaikan Lantai keramik 30x30 cm setara KW II 25.20 m2 #REF! #REF!

Jumlah V #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA 1 Pek. Kusen Alumunium warna P1 2.00 bh 2,951,550.00 5,903,100.00 2 Pek. Kusen Alumunium warna J1 4.00 bh 2,891,960.00 11,567,840.00

3 Pek. Kusen Alumunium warna J2 6.00 bh 2,650,650.00 15,903,900.00

4 Pek. Partisi Folding gate 17.42 m2 500,000.00 8,710,000.00

Jumlah VI 42,084,840.00

VII. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 194.00 m2 #REF! #REF!

2 Pek. Genteng metal lapis pasir 194.00 m2 #REF! #REF!

3 Pek. Nok genteng metal lapis pasir 16.00 m' #REF! #REF!

4 Pek. Flashing listplank metal lapis pasir 24.00 m' #REF! #REF!

5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 171.50 m2 5,565,210.00 954,433,515.00

6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 56.50 m' #REF! #REF!

7 Pek. List plafond profil kayu 193.30 m' #REF! #REF!

Jumlah VII #REF!

VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 309.41 m2 53,710.00 16,618,411.10

2 Pek. Pengecatan plafond sek. Decoplus 171.50 m2 143,920.00 24,682,280.00

3 Pek. Pengecatan listplank sek. Glotex 13.35 m2 122,770.00 1,638,979.50

Jumlah VIII 42,939,670.60

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE

1 Pas. Instalasi titik lampu 10.00 titik #REF! #REF!

2 Pas. Instalasi titik stop kontak 2.00 titik #REF! #REF!

3 Pas. Saklar tunggal broco 1.00 bh #REF! #REF!

4 Pas. Saklar ganda broco 2.00 bh #REF! #REF!

5 Pas. Stop kontak broco 2.00 bh #REF! #REF!

6 Pas. Lampu PLC 8 watt philips 10.00 bh #REF! #REF!

7 Pas. Panel MCB 5x10 A 1.00 bh #REF! #REF!

Jumlah IX #REF!

Jumlah C #REF!

D. PEKERJAAN PAVING BLOCK

1 Pek. Pasir urug m3 147,590.00 -

2 Pas. Paving block natural t=6 cm m2 82,760.00 -

Jumlah D -

Jumlah Total #REF!

Page 76: RAB PAGAR.xls

REKAPITULASI RINCIAN ANGGARAN BIAYA

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi SDN SUKARAME 1Lokasi : Kecamatan Carita - Kabupaten PandeglangAnggaran : DAK TH. 2011 (Luncuran)

NO. URAIAN PEKERJAAN JUMLAH (Rp.)

A. REHABILITASI 6 (ENAM) RUANG KELAS + RUANG GURU

I. PEKERJAAN PERSIAPAN 5,615,680.00

II. PEKERJAAN TANAH DAN URUGAN 712,544.80

III. PEKERJAAN PONDASI DAN BETON #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN #REF!

V. PEKERJAAN LANTAI #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA 118,983,730.00

VII. PEKERJAAN ATAP DAN PLAFOND #REF!

VIII. PEKERJAAN PENGECATAN 128,571,601.55

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE #REF!

REAL COST #REF!

PPN 10% #REF!

JUMLAH TOTAL #REF!

DIBULATKAN #REF!

Terbilang : " Lima Ratus Empat Belas Juta Lima Ratus Ribu Rupiah "

Pandeglang, Juni 2012

Konsultan PerencanaPT. DECO MULTI PILAR

HAKIMIS, STDirektur Utama

Page 77: RAB PAGAR.xls

RINCIAN ANGGARAN BIAYA (RAB)

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi SDN SUKARAME 1Lokasi : Kecamatan Carita - Kabupaten PandeglangAnggaran : DAK TH. 2011 (Luncuran)

NO. URAIAN PEKERJAAN VOLUME

1 2 3 4 5

A. REHABILITASI 6 (ENAM) RUANG KELAS + RUANG GURU

I. PEKERJAAN PERSIAPAN

1 Pek. Papan nama proyek 1.00 bh 365,680.00 365,680.00

2 Pek. Bongkaran 1.00 ls 3,500,000.00 3,500,000.00

3 Biaya Dokumentasi dan Pelaporan 1.00 ls 1,750,000.00 1,750,000.00

Jumlah I 5,615,680.00

II. PEKERJAAN TANAH DAN URUGAN

1 Pek. Galian tanah pondasi teras 6.98 m3 38,980.00 272,080.40

2 Pek. Urugan tanah kembali 4.14 m3 12,990.00 53,778.60

3 Pek. Urugan pasir dibawah pondasi teras 0.28 m3 147,590.00 41,325.20

4 Pek. Urugan pasir dibawah lantai 2.34 m3 147,590.00 345,360.60

Jumlah II 712,544.80

III. PEKERJAAN PONDASI DAN BETON

1 Pas. Pondasi batu kali ad. 1:5 teras 2.57 m3 #REF! #REF!

2 Pas. Rollag batu bata ad. 1:5 teras 2.17 m3 597,565.30 1,296,716.70

3 Pek. Sloof 15/20 beton Site Mix K.175 teras 1.52 m3 #REF! #REF!

4 Pek. Kolom struktur 15/20 beton Site Mix K.175 4.62 m3 #REF! #REF!

5 Pek. Kolom teras 15/20 beton Site Mix K.175 1.43 m3 #REF! #REF!

6 Pek. Kolom praktis 12/12 beton Site Mix K.175 0.45 m3 #REF! #REF!

7 Pek. Balok lintel 10/12 beton Site Mix K.175 1.37 m3 #REF! #REF!

8 Pek. Balok teras 15/20 beton Site Mix K.175 2.27 m3 #REF! #REF!

9 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 4.11 m3 #REF! #REF!

10 Pek. Saluran air hujan L=20 cm 123.00 m' 188,470.00 23,181,810.00

11 Pek. Rabat beton tumbuk ad. 1:3:5 3.88 m3 373,360.00 1,448,636.80

Jumlah III #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN

1 Pek. Dinding bata ad. 1:5 131.10 m2 89,590.00 11,745,249.00

2 Pek. Plesteran dinding ad. 1:5 + acian 287.23 m2 46,330.00 13,307,347.37

3 Pek. Plesteran beton ad 1:3 + acian 113.48 m2 #REF! #REF!

4 Pek. Dinding dan kolom teras keramik 20/25 55.92 m2 26,260.00 1,468,459.20

Jumlah IV #REF!

V. PEKERJAAN LANTAI

1 Perbaikan Lantai keramik 30x30 cm setara KW II 171.20 m2 #REF! #REF!

Jumlah V #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA 1 Pek. Kusen Alumunium warna P1 7.00 bh 2,951,550.00 20,660,850.00 2 Pek. Kusen Alumunium warna J1 23.00 bh 2,891,960.00 66,515,080.00

3 Pek. Kusen Alumunium warna J2 12.00 bh 2,650,650.00 31,807,800.00

Jumlah VI 118,983,730.00

VII. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 585.00 m2 #REF! #REF!

2 Pek. Genteng metal lapis pasir 585.00 m2 #REF! #REF!

3 Pek. Nok genteng metal lapis pasir 62.10 m' #REF! #REF!

4 Pek. Flashing listplank metal lapis pasir 23.30 m' #REF! #REF!

5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 506.70 m2 5,565,210.00 2,819,891,907.00

6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 103.40 m' #REF! #REF!

7 Pek. List plafond profil kayu 544.20 m' #REF! #REF!

8 Pek. Talang miring seng BJLS 28 11.10 m' #REF! #REF!

Jumlah VII #REF!

HARGA SATUAN(Rp.)

J U M L A H(Rp.)

Page 78: RAB PAGAR.xls

1 2 3 4 5

VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 965.17 m2 53,710.00 51,839,012.15

2 Pek. Pengecatan plafond sek. Decoplus 506.70 m2 143,920.00 72,924,264.00

3 Pek. Pengecatan listplank sek. Glotex 31.02 m2 122,770.00 3,808,325.40

Jumlah VIII 128,571,601.55

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE

1 Pas. Instalasi titik lampu 36.00 titik #REF! #REF!

2 Pas. Instalasi titik stop kontak 7.00 titik #REF! #REF!

3 Pas. Saklar tunggal broco 1.00 bh #REF! #REF!

4 Pas. Saklar ganda broco 7.00 bh #REF! #REF!

5 Pas. Stop kontak broco 7.00 bh #REF! #REF!

6 Pas. Lampu PLC 8 watt philips 36.00 bh #REF! #REF!

7 Pas. Panel MCB 5x10 A 1.00 bh #REF! #REF!

Jumlah IX #REF!

Jumlah Total #REF!

Page 79: RAB PAGAR.xls

REKAPITULASI RINCIAN ANGGARAN BIAYA

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi SDN KARYA UTAMA 1Lokasi : Kecamatan Cikedal - Kabupaten PandeglangAnggaran : DAK TH. 2011 (Luncuran)

NO. URAIAN PEKERJAAN JUMLAH (Rp.)

A. REHABILITASI 6 (ENAM) RUANG KELAS + WC

I. PEKERJAAN PERSIAPAN 5,115,680.00

II. PEKERJAAN TANAH DAN URUGAN 1,609,275.10

III. PEKERJAAN PONDASI DAN BETON #REF!

IV. PEKERJAAN DINDING DAN PLESTERAN 22,480,592.25

V. PEKERJAAN LANTAI #REF!

VI. PEKERJAAN KUSEN PINTU DAN JENDELA 113,995,500.00

VII. PEKERJAAN ATAP DAN PLAFOND #REF!

VIII. PEKERJAAN PENGECATAN 126,907,687.30

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE #REF!

X. PEKERJAAN SANITASI #REF!

REAL COST #REF!

PPN 10% #REF!

JUMLAH TOTAL #REF!

DIBULATKAN #REF!

Terbilang : " Empat Ratus Empat Puluh Satu Juta Rupiah "

Pandeglang, Juni 2012

Konsultan PerencanaPT. DECO MULTI PILAR

HAKIMIS, STDirektur Utama

Page 80: RAB PAGAR.xls

RINCIAN ANGGARAN BIAYA (RAB)

Program : Manajemen Pelayanan PendidikanKegiatan : Bantuan Dana Alokasi Khusus (DAK) Bidang PendidikanPekerjaan : Rehabilitasi SDN KARYA UTAMA 1Lokasi : Kecamatan Cikedal - Kabupaten PandeglangAnggaran : DAK TH. 2011 (Luncuran)

NO. URAIAN PEKERJAAN VOLUME

1 2 3 4 5A. REHABILITASI 6 (ENAM) RUANG KELAS + WC I. PEKERJAAN PERSIAPAN

1 Pek. Papan nama proyek 1.00 bh 365,680.00 365,680.00 2 Pek. Bongkaran 1.00 ls 3,000,000.00 3,000,000.00 3 Biaya Dokumentasi dan Pelaporan 1.00 ls 1,750,000.00 1,750,000.00

Jumlah I 5,115,680.00 II. PEKERJAAN TANAH DAN URUGAN

1 Pek. Galian tanah pondasi 14.70 m3 38,980.00 573,006.00

2 Pek. Urugan tanah kembali 4.90 m3 12,990.00 63,651.00

3 Pek. Urugan pasir dibawah pondasi 0.92 m3 147,590.00 135,782.80

4 Pek. Urugan pasir dibawah lantai 5.67 m3 147,590.00 836,835.30

Jumlah II 1,609,275.10

III. PEKERJAAN PONDASI DAN BETON

1 Pas. Pondasi batu kali ad. 1:5 9.19 m3 #REF! #REF!

2 Pas. Rollag batu bata ad. 1:5 0.24 m3 597,565.30 143,415.67

3 Pek. Sloof 15/20 beton Site Mix K.175 0.79 m3 #REF! #REF!

4 Pek. Kolom struktur 15/20 beton Site Mix K.175 0.21 m3 #REF! #REF!

5 Pek. Kolom teras 15/20 beton Site Mix K.175 0.08 m3 #REF! #REF!

6 Pek. Kolom praktis 12/12 beton Site Mix K.175 0.40 m3 #REF! #REF!

7 Pek. Balok teras 15/20 beton Site Mix K.175 0.15 m3 #REF! #REF!

8 Pek. Ringbalok & ampig 12/20 beton Site Mix K.175 0.75 m3 #REF! #REF!

9 Pek. Balok lintel 10/12 beton Site Mix K.175 1.32 m3 #REF! #REF!

10 Pek. Rabat beton tumbuk ad. 1:3:5 1.79 m3 373,360.00 668,314.40

Jumlah III #REF!IV. PEKERJAAN DINDING DAN PLESTERAN

1 Pek. Dinding bata ad. 1:5 112.02 m2 89,590.00 10,036,319.75 2 Pek. Plesteran dinding ad. 1:5 + acian 224.05 m2 46,330.00 10,380,236.50 3 Pek. Dinding dan kolom teras keramik 20/25 55.80 m2 26,260.00 1,465,308.00 4 Pek. Dinding keramik 20/25 km 22.80 m2 26,260.00 598,728.00

Jumlah III 22,480,592.25 V. PEKERJAAN LANTAI

1 Pek. Lantai keramik anti slip 20x20 cm setara KW II 10.24 m2 4,209,310.00 43,103,334.40 2 Perbaikan Lantai keramik 30x30 cm setara KW II 100.70 m2 #REF! #REF!

Jumlah V #REF!VI. PEKERJAAN KUSEN PINTU DAN JENDELA

1 Pek. Kusen Alumunium warna P1 6.00 bh 2,951,550.00 17,709,300.00 2 Pek. Kusen Alumunium warna P2 2.00 bh 1,869,490.00 3,738,980.00 3 Pek. Kusen Alumunium warna J1 12.00 bh 2,891,960.00 34,703,520.00 4 Pek. Kusen Alumunium warna J2 18.00 bh 2,650,650.00 47,711,700.00 5 Pek. Pintu PVC 4.00 bh 308,000.00 1,232,000.00 6 Pek. Folding gate 17.80 m2 500,000.00 8,900,000.00

Jumlah VI 113,995,500.00 VII. PEKERJAAN ATAP DAN PLAFOND

1 Pek. Rangka atap baja ringan 587.58 m2 #REF! #REF!2 Pek. Genteng metal lapis pasir 587.58 m2 #REF! #REF!3 Pek. Nok genteng metal lapis pasir 69.30 m' #REF! #REF!4 Pek. Flashing listplank metal lapis pasir 24.60 m' #REF! #REF!5 Pek. Plafond GRC 1x1 m + rangka kayu klas III 508.90 m2 5,565,210.00 2,832,135,369.00 6 Pek. Listplang tumpang sari 3/20+2/8 kayu kelas II+penguat 117.40 m' #REF! #REF!7 Pek. List plafond profil kayu 507.40 m' #REF! #REF!8 Pek. Talang miring seng BJLS 28 22.20 m' #REF! #REF!

Jumlah VII #REF!VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding & beton sek. Decoplus 918.69 m2 53,710.00 49,342,839.90 2 Pek. Pengecatan plafond sek. Decoplus 508.90 m2 143,920.00 73,240,888.00 3 Pek. Pengecatan listplank sek. Glotex 35.22 m2 122,770.00 4,323,959.40

Jumlah VIII 126,907,687.30 1 2 3 4 5

HARGA SATUAN(Rp.)

J U M L A H(Rp.)

Page 81: RAB PAGAR.xls

IX. PEKERJAAN INSTALASI LISTRIK DAN ARMATURE 1 Pas. Instalasi titik lampu 30.00 titik #REF! #REF!2 Pas. Instalasi titik stop kontak 7.00 titik #REF! #REF!3 Pas. Saklar tunggal broco 2.00 bh #REF! #REF!4 Pas. Saklar ganda broco 6.00 bh #REF! #REF!5 Pas. Stop kontak broco 7.00 bh #REF! #REF!6 Pas. Lampu PLC 8 watt philips 30.00 bh #REF! #REF!7 Pas. Panel MCB 5x10 A 1.00 bh #REF! #REF!

Jumlah IX #REF!X. PEKERJAAN SANITASI

1 Pas. Kloset jongkok 4.00 bh 899,150.00 3,596,600.00 2 Pas. Kran air dia 1/2" 4.00 bh 30,010.00 120,040.00 3 Pas. Floor drain 4.00 bh 411,840.00 1,647,360.00 4 Pas. Pipa PVC dia. 1/2" 12.00 m' 964,250.00 11,571,000.00 5 Pas. Pipa PVC dia. 3" 12.00 m' #REF! #REF!6 Pas. Pipa PVC dia. 4" 12.00 bh 33,170.00 398,040.00 7 Pek. Septictank dan rembesan 1.00 bh 29,210.00 29,210.00

Jumlah X #REF! Jumlah Total #REF!