Download - MENGHITUNG RAB

Transcript
Page 1: MENGHITUNG RAB

DAFTAR HARGA MATERIAL DAN UPAH

PADA AKHIR 2008

NO. URAIAN BAHAN SATUANHARGA SATUAN (Rp)

Bodetabek Yogyakarta Surabaya Medan Makassar

A. DAFTAR HARGA MATERIAL1 Ampelas ( kertas pasir ) Lbr 3,500.00 3,600.00 3,550.00 2,500.00 2,500.00 2 Akustik 600 x 1200 x 15 mm setara Amstrong Lbr 72,000.00 78,000.00 74,000.00 70,000.00 78,000.00 3 Aluminium color untuk kusen pintu dan jendela 4" M1 82,000.00 88,000.00 85,000.00 78,000.00 86,000.00 4 Aluminium color untuk daun pintu & jendela M1 79,000.00 83,000.00 82,000.00 75,600.00 80,000.00 5 Asbes plat 1 x 1 m tb. 3 mm Lbr 14,000.00 14,000.00 12,500.00 13,500.00 13,500.00 6 Asbes Gelombang 270CM X 105 CM tebal 4 mm Lbr 68,500.00 67,000.00 66,000.00 70,000.00 72,000.00 7 Asbes Gelombang 240CM X 105 CM tebal 4 mm Lbr 60,000.00 60,000.00 58,000.00 62,000.00 65,000.00 8 Asbes Gelombang 150CM X 102 CM tebal 5 mm Lbr 46,000.00 46,000.00 45,000.00 48,000.00 48,000.00 9 Asbes Gelombang 270CM X 102 CM tebal 5 mm Lbr 87,500.00 87,000.00 85,000.00 92,000.00 90,000.00

10 Asbes Gelombang 240CM X 102 CM tebal 5 mm Lbr 78,200.00 78,500.00 77,000.00 84,000.00 81,000.00 11 Bata Merah Bh 550.00 300.00 350.00 520.00 400.00 12 Batu tempel hitam M2 72,500.00 64,100.00 65,000.00 82,000.00 86,000.00 10 Bataco putih ( trass ) Bh 2,000.00 2,200.00 2,250.00 4,000.00 4,200.00 11 Bataco semen Bh 2,250.00 2,100.00 2,150.00 4,200.00 4,300.00 12 Bata ringan ( hebel/celcon ) Bh 2,500.00 2,550.00 2,550.00 3,500.00 3,800.00 13 Batu Belah M3 145,000.00 128,200.00 128,200.00 128,200.00 72,000.00 14 Batu alam / tempel M2 65,000.00 157,900.00 157,900.00 157,900.00 78,000.00 15 Batu Koral M3 165,000.00 164,800.00 164,800.00 164,800.00 99,500.00 16 Bendrat / Kawat Beton Kg 11,200.00 11,500.00 11,500.00 13,400.00 13,000.00 17 Besi Profil kg 9,800.00 10,000.00 10,000.00 12,000.00 12,000.00 18 Besi beton / Ulir Kg 8,900.00 9,400.00 9,300.00 11,000.00 11,500.00 19 Besi Beton U-24 Kg 8,500.00 8,500.00 8,600.00 8,900.00 8,800.00 20 Besi Beton U-39 Kg 8,700.00 8,800.00 8,800.00 9,000.00 9,000.00 21 Besi C ( lip channel ) / besi strip Kg 9,500.00 10,000.00 10,000.00 11,000.00 11,000.00 22 Besi Siku ( L ) Kg 9,400.00 9,500.00 9,600.00 11,000.00 10,500.00 23 Cat meni kualitas bagus Kg 16,000.00 16,500.00 16,500.00 19,000.00 19,000.00 24 Cat dasar ( material primer, zinc cromat, dll) Kg 39,000.00 38,500.00 38,500.00 41,000.00 40,000.00 25 Cat Besi kg 35,000.00 35,500.00 36,000.00 38,500.00 38,500.00 26 Cat tembok untuk interior kualitas baik Kg 44,000.00 45,000.00 45,000.00 46,000.00 47,000.00 27 Cat tembok Weathersield/exterior kualitas baik Kg 71,000.00 72,000.00 72,000.00 75,000.00 78,000.00 28 Cat tembok kualitas sedang Kg 15,000.00 16,000.00 16,000.00 17,000.00 17,500.00 29 Cat Kayu kualitas sedang Kg 27,500.00 27,000.00 27,500.00 28,000.00 28,250.00 30 Cat Kayu kualitas baik Kg 36,000.00 37,000.00 37,000.00 39,000.00 40,000.00 31 Compoun Kg 28,000.00 28,500.00 28,500.00 30,000.00 32,000.00 32 Conblock 8 x 20 x 40 Bh 3,800.00 2,200.00 2,500.00 3,200.00 3,000.00 33 Dempul besi Kg 24,000.00 23,000.00 22,500.00 25,000.00 25,000.00 34 Dempul halus Kg 23,100.00 22,000.00 20,000.00 24,000.00 24,500.00 35 Door closer Bh 348,000.00 350,000.00 325,000.00 380,000.00 412,000.00 36 Door stopper kualitas baik Bh 55,000.00 60,000.00 60,000.00 66,000.00 65,000.00 37 Door Holder Bh 45,000.00 50,000.00 45,000.00 50,000.00 50,000.00 38 Engsel pintu Bh 22,500.00 22,000.00 22,000.00 25,000.00 25,000.00 39 Engsel jendela Bh 21,000.00 20,000.00 20,000.00 22,000.00 22,000.00 40 Formika 120 x 240 t. 1.5 mm lbr 125,000.00 135,000.00 130,000.00 166,700.00 150,000.00 41 Genteng Sirap ( 80 bh/m2 ) Bh 900.00 1,000.00 1,000.00 1,100.00 600.00 42 Genteng Palentong ( 25 bh ) Bh 1,100.00 800.00 800.00 800.00 800.00 43 Genteng Keramik Glazur ( 14,5/m2 ) M2 72,000.00 70,000.00 60,000.00 80,000.00 72,500.00 44 Genteng keramik Natural ( 14,5/m2 ) M2 67,000.00 65,000.00 62,500.00 75,000.00 70,000.00 45 Genteng beton Warna M2 72,000.00 62,500.00 62,500.00 70,000.00 65,000.00 46 Genteng metal lapis M2 132,000.00 130,000.00 125,000.00 134,000.00 129,800.00 47 Gypsum board 120 x 240 tebal 9 mm Lbr 57,100.00 55,000.00 56,000.00 86,000.00 78,000.00 48 GRC tebal 5 mm Lbr 45,600.00 45,600.00 45,600.00 47,500.00 47,500.00 49 Glass Block Bh 17,500.00 18,000.00 17,000.00 21,500.00 20,000.00 49 Granit jenis dan warna standart M2 600,000.00 650,000.00 600,000.00 750,000.00 750,000.00 50 Hollow 4/4 Zincromate Btg 45,000.00 45,000.00 45,000.00 48,000.00 48,000.00 51 Hollow 2/4 Zincromate Btg 32,000.00 32,000.00 32,000.00 35,000.00 35,000.00 52 Injuk ikat 15,000.00 8,000.00 10,000.00 7,500.00 6,000.00 53 Kaca bening (polos) tebal 3 mm M2 48,000.00 48,000.00 45,000.00 61,000.00 60,600.00 54 Kaca bening (polos) tebal 5 mm M2 66,000.00 71,500.00 55,000.00 120,600.00 75,000.00 55 Kait angin untuk daun jendela Bh 10,900.00 11,000.00 10,000.00 12,000.00 12,000.00 56 Kawat Duri Rol 145,000.00 145,500.00 148,000.00 155,000.00 166,000.00 57 Kawat las M1 11,000.00 12,000.00 12,500.00 18,000.00 18,000.00 58 Kaca rayband tebal 5 mm M2 125,000.00 125,000.00 130,000.00 159,000.00 155,000.00 59 Balok dolken / Stoot dia 8 s/d 10 cm Btg 18,600.00 17,500.00 15,000.00 8,000.00 8,500.00 60 Balok kayu Borneo Super / Meranti M3 3,200,000.00 3,000,000.00 2,819,300.00 1,450,000.00 1,378,000.00 61 Papan kayu Borneo Super / Meranti M3 3,300,000.00 3,525,000.00 3,450,000.00 2,859,000.00 1,660,000.00 62 Balok kayu Kamper Samarinda/Damar M3 5,200,000.00 5,000,000.00 4,800,000.00 4,650,000.00 5,766,800.00 63 Papan kayu Kamper Samarinda/Damar M3 5,350,000.00 5,350,000.00 5,100,000.00 4,900,000.00 5,000,000.00 64 Balok kayu Kamper Medan M3 4,100,000.00 4,100,000.00 4,000,000.00 3,850,000.00 3,950,000.00 65 Papan kayu Kamper Medan M3 4,300,000.00 4,275,000.00 4,100,000.00 3,990,000.00 3,800,000.00 66 Pagar BRC lengkap tiang M2 130,000.00 135,000.00 130,000.00 152,000.00 148,000.00 67 Pegangan tangga profil kamper M1 73,000.00 72,000.00 71,000.00 62,000.00 65,000.00 68 Papan kayu terentang M3 2,300,000.00 1,750,000.00 1,700,000.00 1,448,200.00 1,220,000.00

Page 2: MENGHITUNG RAB

NO. URAIAN BAHAN SATUANHARGA SATUAN (Rp)

Bodetabek Yogyakarta Surabaya Medan Makassar69 Keramik lantai 20 x 25 cm M2 38,000.00 34,000.00 32,000.00 36,000.00 36,000.00 70 Keramik lantai 10 x 20 cm M2 35,000.00 32,000.00 31,000.00 34,000.00 32,000.00 71 Keramik lantai 20 x 20 cm M2 37,500.00 33,000.00 32,000.00 34,000.00 33,000.00 72 Keramik lantai polos 30 x 30 cm M2 39,000.00 37,500.00 34,000.00 39,000.00 38,500.00 73 Keramik ukuran 40 x 40 cm granito polished M2 205,000.00 210,000.00 210,000.00 225,000.00 246,000.00 74 Keramik ukuran 40 x 40 cm granito unpolished M2 195,000.00 195,800.00 196,000.00 202,000.00 205,000.00 73 Keramik lantai 60x90 cm Standart M2 292,000.00 300,000.00 300,000.00 340,000.00 336,000.00 74 Keramik lantai 60x60 cm Standart M2 265,000.00 276,000.00 267,000.00 298,000.00 290,000.00 75 Keramik dinding polos 10 x 20 cm M2 36,000.00 36,000.00 36,000.00 36,000.00 34,000.00 76 Keramik dinding motif 10 x 20 cm M2 36,500.00 37,000.00 38,000.00 38,000.00 38,000.00 77 Keramik dinding motif 20 x 20 cm M2 38,500.00 37,000.00 38,000.00 39,000.00 38,000.00 78 Keramik dinding polos 20 x 20 cm M2 38,000.00 38,000.00 38,000.00 37,000.00 38,000.00 79 Keramik dinding motif 20 x 25 cm M2 38,500.00 38,500.00 38,500.00 39,000.00 39,000.00 80 Keramik dinding polos 20 x 25 cm M2 38,000.00 38,500.00 37,500.00 38,000.00 38,000.00 81 Keramik Essenza ukuran 60 x 60 cm polish M2 248,000.00 250,000.00 252,000.00 260,000.00 255,000.00 82 Keramik Essenza ukuran 60 x 60 cm unpolih M2 224,000.00 230,000.00 230,000.00 245,000.00 238,000.00 83 Keramik dinding polos 30 x 30 cm M2 40,000.00 40,000.00 40,000.00 41,000.00 40,000.00 84 Keramik dinding motif 30 x 30 cm M2 41,000.00 40,000.00 40,000.00 43,000.00 41,000.00 85 Kawat duri untuk pagar Kg 30,000.00 32,000.00 30,000.00 38,000.00 41,000.00 86 Kuas 2 " cat Bh 9,000.00 9,000.00 9,000.00 9,000.00 9,200.00 87 Kuas 3 " cat Bh 13,550.00 13,500.00 13,500.00 14,000.00 14,000.00 88 Kunci Pintu 2 slaag besar kualitas baik Bh 210,000.00 175,000.00 160,000.00 189,000.00 175,000.00 89 Kunci Pintu 2 slaag kualitas standar Bh 45,000.00 45,000.00 45,000.00 55,000.00 55,000.00 90 Kunci Pintu KM/WC putar bulat ( Alpha ) Bh 49,000.00 50,000.00 50,000.00 55,000.00 55,000.00 91 Kawat kasa 1 x 1 cm M2 15,000.00 16,000.00 16,000.00 22,000.00 20,000.00 92 Kawat Harmonika 4 M2 16,000.00 18,000.00 17,500.00 23,000.00 22,000.00 93 Lem Vinyl kg 30,800.00 30,800.00 30,800.00 32,000.00 35,000.00 94 Lem Kayu Ltr 25,600.00 25,600.00 25,600.00 27,000.00 28,000.00 95 List Kayu 1/4 M1 4,300.00 3,700.00 3,500.00 1,900.00 1,925.00 96 List profil Gypsum M1 7,000.00 7,000.00 7,000.00 8,000.00 8,200.00 97 List Profil kayu 5 x 5 cm M¹ 13,500.00 12,500.00 12,000.00 6,800.00 7,700.00 98 Marmer setara Citatah / padalarang 60 x 60 M2 133,000.00 135,000.00 130,000.00 212,000.00 200,000.00 99 Meni besi Kg 14,500.00 15,000.00 15,000.00 22,000.00 20,000.00

100 Meni kayu Kg 15,000.00 15,000.00 15,000.00 17,000.00 16,000.00 101 Minyak cat ( Tinner ) Ltr 16,500.00 17,000.00 16,500.00 19,300.00 20,000.00 102 Minyak Pelumas begisting (oli/minyak bekas) Ltr 12,000.00 10,000.00 10,000.00 12,500.00 10,000.00 103 Multiplex 9 mm 120 X 240 Lbr 105,000.00 107,000.00 102,000.00 112,000.00 105,000.00 104 Multiplex 12 mm 120 X 240 Lbr 135,000.00 135,000.00 132,000.00 140,000.00 135,000.00 105 Multiplex 16 mm 120 X 240 Lbr 172,000.00 172,000.00 170,000.00 182,000.00 172,000.00 106 Nok genteng Keramik Glazur Bh 16,500.00 16,500.00 16,000.00 24,000.00 26,500.00 107 Nok genteng beton warna Bh 15,500.00 15,000.00 14,500.00 15,000.00 16,000.00 108 Nok genteng Metal M1 53,000.00 54,000.00 54,000.00 60,000.00 58,000.00 109 Paku Kg 11,000.00 11,000.00 11,500.00 14,000.00 14,700.00 110 Paku sekrup 3,5" bh 560.00 500.00 500.00 600.00 750.00 111 Parquet jati M2 250,000.00 260,000.00 274,000.00 276,000.00 278,000.00 112 Pasir Pasang M3 165,000.00 66,000.00 95,000.00 84,000.00 68,000.00 113 Pasir Beton M3 180,000.00 72,000.00 105,000.00 92,000.00 72,000.00 114 Pasir Urug M3 145,000.00 45,000.00 92,000.00 62,000.00 66,000.00 115 Panel Listrik standar untuk rumah unit 250,000.00 250,000.00 250,000.00 300,000.00 300,000.00 116 Perancah kayu M3 3,200,000.00 2,900,000.00 2,800,000.00 2,200,000.00 2,000,000.00 117 Pintu alluminium / pintu PVC bh 375,000.00 375,000.00 360,000.00 400,000.00 400,000.00 118 Pipa Galvanis Ø 1/2" klas medium M1 10,500.00 11,000.00 10,000.00 12,000.00 11,000.00 119 Pipa Galvanis Ø 3/4" klas medium M1 17,500.00 17,500.00 17,000.00 18,000.00 18,500.00 120 Pipa Galvanis Ø 1" klas medium M1 25,000.00 26,000.00 26,000.00 30,000.00 30,250.00 121 Pipa Galvanis Ø 1 1/2" klas medium M1 30,000.00 32,000.00 30,000.00 32,000.00 33,000.00 122 Pipa PVC AW Ø 1/2' setara Maspion M1 4,200.00 3,400.00 3,300.00 3,300.00 3,400.00 123 Pipa PVC AW Ø 3/4' M1 5,000.00 4,500.00 4,500.00 4,600.00 4,675.00 124 Pipa PVC AW Ø 1" M1 6,500.00 6,400.00 6,400.00 6,750.00 6,700.00 125 Pipa PVC AW Ø 2" M1 8,500.00 8,500.00 8,500.00 9,000.00 9,000.00 126 Pipa PVC AW Ø 4" M1 17,000.00 18,500.00 19,000.00 20,000.00 19,500.00 127 Penyambung Pipa PVC (macam2) ukuran 1/2 " Bh 2,000.00 2,000.00 2,200.00 2,250.00 2,250.00 128 Penyambung Pipa PVC (macam2) ukuran 3/4 " Bh 2,750.00 2,500.00 2,500.00 3,000.00 3,000.00 129 Penyambung Pipa PVC (macam2) ukuran 2 " Bh 5,200.00 5,500.00 5,500.00 6,000.00 6,000.00 130 Penyambung Pipa PVC (macam2) ukuran 4 " Bh 12,000.00 12,500.00 12,500.00 14,000.00 14,000.00 131 Plamir tembok Kg 19,000.00 20,000.00 20,000.00 25,000.00 27,000.00 132 Plamir/dempul plitur (impra) Kg 22,000.00 23,100.00 23,000.00 25,000.00 26,000.00 133 Plamir kayu Kg 17,000.00 17,500.00 18,000.00 23,100.00 22,500.00 134 Triplek Tebal 3 mm ukr 120 x 240 cm Lbr 38,500.00 37,000.00 36,000.00 40,000.00 35,000.00 135 Triplek Tebal 4 mm ukr 120 x 240 cm Lbr 50,000.00 50,000.00 47,500.00 52,000.00 51,000.00 136 Plint Keramik ukuran 10 x 40 cm Bh 7,500.00 7,500.00 7,200.00 10,000.00 9,000.00 137 Plat Almunium 0,2 mm M1 16,000.00 17,000.00 17,000.00 20,000.00 18,000.00 138 Politur jadi Kg 33,000.00 33,000.00 33,000.00 35,000.00 35,000.00 139 Polycarbonate M2 198,000.00 200,000.00 198,500.00 215,000.00 222,000.00

Page 3: MENGHITUNG RAB

NO. URAIAN BAHAN SATUANHARGA SATUAN (Rp)

Bodetabek Yogyakarta Surabaya Medan Makassar140 Ramset / dina bolt / piser Bh 2,500.00 2,400.00 2,100.00 2,800.00 2,200.00 141 Ramin ( papan kayu ramin ) m3 6,700,000.00 6,600,000.00 6,500,000.00 6,800,000.00 5,500,000.00 142 Residu atau ter Ltr 3,100.00 3,000.00 3,000.00 3,600.00 3,400.00 143 Rooster bata merah 12 x 11,5 x 24 Bh 3,500.00 3,000.00 3,200.00 4,200.00 4,100.00 144 Roof light ( Fibreglass ) tebal 1 mm, lbr 1 m M1 62,000.00 62,000.00 60,000.00 66,000.00 68,000.00 145 Rol cat Bh 26,500.00 26,500.00 26,500.00 27,000.00 27,400.00 146 Rolling door M2 165,000.00 160,000.00 161,000.00 175,000.00 180,000.00 147 Semen PC (abu-abu) 50 kg zak 48,000.00 46,000.00 44,000.00 49,000.00 42,000.00 148 Semen instant kg 6,500.00 2,450.00 2,450.00 2,450.00 2,450.00 149 Semen warna/putih kg 4,200.00 12,700.00 12,700.00 12,700.00 12,700.00 150 Seng plat 0,0400 x 0,9 m M1 31,000.00 32,000.00 32,000.00 33,300.00 33,000.00 151 Seng Gelombang 180 x 90 x 0,03 Lbr 43,000.00 53,800.00 53,800.00 51,000.00 53,800.00 152 Seng Gelombang 180 x 90 x 0,05 Lbr 57,600.00 58,000.00 56,500.00 61,000.00 60,600.00 153 Sirtu ( pasir koral ) M3 165,000.00 88,000.00 105,000.00 82,000.00 102,000.00 154 Sisalation / alluminium foil M2 4,200.00 4,300.00 4,250.00 5,500.00 5,600.00 155 Slot / Grendel pintu 4 " Bh 29,000.00 31,000.00 30,000.00 33,000.00 32,500.00 156 Slot / Grendel jendela 3 " Bh 19,000.00 19,100.00 19,000.00 19,500.00 19,500.00 157 Saklar / Stop Kontak listrik standart Bh 20,000.00 20,000.00 21,000.00 21,500.00 21,200.00 158 Split 2/3 cm (batu pecah) M3 178,000.00 140,000.00 157,000.00 161,700.00 132,000.00 159 Split 1/2 cm (batu pecah) M3 178,000.00 141,000.00 172,000.00 162,000.00 133,000.00 160 Water Proofing membran M2 55,000.00 60,000.00 60,000.00 75,000.00 70,000.00 161 Water Proofing Emulsion / coating / Floor Harderner Kg 41,000.00 42,000.00 42,500.00 44,000.00 45,000.00 162 Tangki Air Fiber Glass 1 m3 Bh 875,000.00 850,000.00 825,000.00 912,000.00 905,000.00 163 Teakwood 4 mm ukr 120 x 240 Lbr 94,000.00 85,000.00 79,000.00 82,000.00 76,000.00 164 Teak oil Ltr 39,000.00 38,800.00 38,500.00 39,600.00 40,000.00 165 Triplek tebal 4 mm Ukuran Pintu Lbr 36,000.00 36,000.00 35,000.00 42,000.00 33,000.00 166 Ubin abu-abu 30 x 30 cm tebal 3 cm M2 25,600.00 27,500.00 26,800.00 43,000.00 41,000.00 167 Ubin abu-abu 20 x 20 cm tebal 2 cm M2 23,500.00 24,000.00 24,500.00 40,000.00 38,000.00 168 Melamik Impra Ltr 29,500.00 300,000.00 29,800.00 32,000.00 32,200.00 169 Wallpaper M2 15,600.00 15,700.00 15,400.00 18,000.00 17,600.00 170 Roof drain besi 3 " bh 69,500.00 71,000.00 68,500.00 88,000.00 85,000.00 171 Bak mandi fibreglass 60 x 60 cm Bh 150,000.00 150,000.00 150,000.00 178,000.00 182,000.00 172 Bak cuci stainless steel Bh 173,000.00 173,000.00 170,000.00 191,500.00 192,000.00 173 Floor drain stailes steel Bh 59,000.00 59,500.00 60,000.00 62,000.00 63,000.00 174 Kitchen Zink stailessteel standar 1 lubang Bh 188,000.00 190,000.00 179,400.00 194,000.00 198,000.00 175 Kloset duduk warna standart setara TOTO Bh 2,265,000.00 2,280,000.00 2,275,000.00 2,300,000.00 2,350,000.00 176 Kloset jongkok porselen warna standart Bh 146,000.00 145,000.00 142,000.00 170,000.00 173,000.00 177 Kran Air 1/2" kualitas sedang Bh 54,900.00 55,000.00 54,500.00 56,000.00 56,000.00 178 Kran Air angsa 1/2" kualitas sedang Bh 155,000.00 155,000.00 156,000.00 157,500.00 155,500.00 179 Soap Holder ( Tempat Sabun) Bh 30,000.00 26,000.00 24,400.00 32,000.00 33,000.00 180 Shower lengkap dgn slang plastik Bh 125,000.00 130,000.00 130,000.00 132,000.00 145,000.00 181 Shower Set dinding Bh 229,000.00 232,000.00 233,000.00 250,000.00 245,000.00 182 Urinoir warna standart Bh 377,000.00 375,000.00 360,000.00 380,000.00 400,000.00 183 Wastafel Dinding / Gantung Bh 202,000.00 206,000.00 208,500.00 220,000.00 215,000.00 184 Wastafel Pedestal / kaki Bh 245,000.00 248,000.00 250,000.00 255,000.00 260,000.00 185 Water Pump ( Pompa Air 100 Watt ) Set 750,000.00 775,000.00 740,000.00 800,000.00 925,000.00 186 Kabel NYA 1 x 1,5 mm ( 50 m ) Roll 105,000.00 105,000.00 110,000.00 160,000.00 165,000.00 187 Kabel NYM 2 x 1,5 mm ( 50 m ) Roll 225,000.00 225,000.00 225,000.00 260,000.00 278,000.00 188 Kabel NYA 2 x 2,5 mm ( 50 m ) Roll 350,000.00 375,000.00 372,500.00 415,000.00 425,000.00 189 Kabel NYM 3 x 2,5 mm ( 50 m ) Roll 400,000.00 410,000.00 415,000.00 450,000.00 445,000.00 190 Lampu SL / TL 36 watt Bh 55,000.00 56,000.00 54,000.00 55,500.00 58,000.00 191 Lampu Baret 30 cm + lampu 18 watt Bh 85,000.00 87,000.00 88,000.00 92,000.00 90,000.00 192 Lampu taman lengkap tiang ( standart ) Bh 140,000.00 152,500.00 155,000.00 175,000.00 186,000.00 193 Lampu Pijar 40 watt Bh 5,000.00 5,000.00 5,000.00 6,000.00 6,000.00 194 Cotton plaster Bh 55,000.00 56,000.00 54,000.00 55,500.00 58,000.00 195 Profil Alluminium "T" M1 30,000.00 26,000.00 24,400.00 32,000.00 33,000.00 196 Pipa PVC type D 3 " M1 6,500.00 6,400.00 6,400.00 6,750.00 6,700.00 197 Pipa PVC type D 4 " M1 8,500.00 8,500.00 8,500.00 9,000.00 9,000.00 198 Soda api kg 41,000.00 42,000.00 42,500.00 44,000.00 45,000.00 199 Tanah Urug M3 112,000.00 75,000.00 82,000.00 78,000.00 70,000.00 200 Plint Keramik ukuran 10 x 30 cm Bh 6,500.00 6,500.00 6,200.00 8,000.00 7,500.00 201 Tarikan Jendela Bh 15,600.00 15,700.00 15,400.00 18,000.00 17,600.00 202 Septictank Jadi 1,5 m3 ( fiber semen ) Bh 1,500,000.00 1,500,000.00 1,400,000.00 1,600,000.00 1,550,000.00 203 Baja ringan untuk rangka atap ( Pabrikan) M2 160,000.00 165,000.00 165,000.00 170,000.00 170,000.00

B. DAFTAR HARGA UPAH TUKANG DAN PEKERJA1 Pembantu tukang setengah terampil hari 32,500.00 25,000.00 35,000.00 37,500.00 25,000.00 2 Pembantu tukang Terampil hari 35,000.00 27,500.00 37,500.00 40,000.00 27,500.00 3 Tukang Gali hari 36,000.00 28,000.00 35,000.00 40,000.00 32,500.00 4 Tukang kayu setengah terampil hari 40,000.00 33,000.00 40,000.00 50,000.00 38,000.00 5 Tukang kayu Terampil hari 45,000.00 36,000.00 49,000.00 52,500.00 40,000.00 6 Tukang batu setengah terampil hari 40,000.00 30,000.00 40,000.00 40,000.00 38,000.00 7 Tukang batu Terampil hari 45,000.00 33,000.00 49,000.00 45,000.00 40,000.00 8 Tukang besi Beton setengah terampil hari 40,000.00 30,000.00 40,000.00 40,000.00 38,000.00 9 Tukang besi Beton Terampil hari 45,000.00 33,000.00 49,000.00 45,000.00 40,000.00

10 Tukang cat/Pelitur Setengah Terampil hari 37,500.00 32,000.00 40,000.00 40,000.00 38,000.00 11 Tukang Cat/Pelitur Terampil hari 40,000.00 34,000.00 49,000.00 45,000.00 40,000.00 12 Tukang Besi Profil Setengah Terampil hari 40,000.00 34,000.00 40,000.00 45,000.00 38,000.00 13 Tukang Besi Profil Terampil hari 45,000.00 37,000.00 49,000.00 47,500.00 40,000.00 14 Tukang Ledeng/Pipa hari 45,000.00 33,000.00 45,000.00 55,000.00 38,000.00 15 Tukang Listrik hari 45,000.00 40,000.00 50,000.00 60,000.00 42,500.00

Page 4: MENGHITUNG RAB

ANALISA HARGA SATUAN PEKERJAANKota : Bodetabek

No. URAIAN KOEFISIEN SAT HARGA SATUANI PEKERJAAN PERSIAPAN

1 1 M¹ PAGAR SENG GELOMBANG TINGGI : 2 Ma Tiang Kayu Borneo 4/6 0.05 m3 3,200,000.00 b Semen PC (abu-abu) 0.05 sak 48,000.00 c Seng Gelombang 1.20 lbr 43,000.00 d Pasir beton 0.01 m3 180,000.00 e Splitz (batu pecah) 0.01 m3 178,000.00 f Balok kayu borneo 4/6 0.05 m3 3,200,000.00 g Paku 5 - 10 cm 0.06 kg 11,000.00 h Meni Besi 0.45 kg 14,500.00 i Tukang Kayu 0.20 org 45,000.00 j Pembantu Tukang 0.10 org 35,000.00

JumlahDibulatkan

2 1 M¹ PAGAR KAWAT BERDURI TINGGI : 1,8 Ma Tiang dari Kayu Borneo 4/6 0.05 m3 3,200,000.00 b Semen PC (abu-abu) 0.04 sak 48,000.00 c Kawat Duri 2.50 kg 145,000.00 d Pasir beton 0.01 m3 180,000.00 e Splitz (batu pecah) 0.01 m3 178,000.00 f Paku 5 - 10 cm 0.06 kg 11,000.00 g Tukang Kayu 0.20 org 45,000.00 h Pembantu Tukang 0.30 org 35,000.00

JumlahDibulatkan

3 1 M1 PENGUKURAN & PEMASANGAN BOWPLANKa Kayu kaso 5/7 borneo 0.02 m3 3,200,000.00 b Paku 5 - 10 cm 0.02 kg 11,000.00 c Papan Papan kayu terentang 2/20 0.00 m3 2,300,000.00 d Tukang Kayu 0.10 org 45,000.00 e Pembantu Tukang 0.10 org 35,000.00

JumlahDibulatkan

4 1 m2 PEMBUATAN KANTOR DIREKSI a Kayu kaso 5/7 borneo 0.02 m3 3,200,000.00 b Papan kayu terentang 0.18 m3 2,300,000.00 c Paku semua ukuran 0.85 kg 11,000.00 d Besi Strip 1.10 kg 9,500.00 e Semen PC (abu-abu) 35.00 kg 48,000.00 f Pasir Pasang 0.15 m3 165,000.00 g Pasir beton 0.10 m3 180,000.00 h Splitz (batu pecah) 0.15 m3 178,000.00 i Bata Merah 30.00 bh 550.00 j Seng Gelombang 180 x 90 x 0,05 cm 1.20 lbr 57,600.00 k Seng Plat BJLS 32 1.00 m2 31,000.00 l Kawat harmonika 2.00 m2 16,000.00

m Kaca Polos 3 mm 0.08 m2 48,000.00 n Kunci Tanam standart 0.15 bh 45,000.00 o Triplek 120 x 240 x 0,4 cm 0.06 lbr 50,000.00 p Tukang Kayu 2.00 org 45,000.00 q Tukang Batu 1.00 org 45,000.00 r Pembantu Tukang 2.00 org 35,000.00

JumlahDibulatkan

Page 5: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUAN5 1 m2 PEMBUATAN GUDANG PROYEK

a Kayu kaso 5/7 borneo 0.02 m3 3,200,000.00 b Papan kayu terentang 0.10 m3 2,300,000.00 c Paku 0.30 kg 11,000.00 d Semen PC (abu-abu) 0.21 sak 48,000.00 e Pasir Beton 0.03 m3 180,000.00 f Splitz (batu pecah) 0.05 m3 178,000.00 g Seng Gelombang 180 x 90 x 0,05 cm 1.20 lbr 57,600.00 h Tukang Kayu 1.00 org 45,000.00 i Pembantu Tukang 1.00 org 35,000.00

JumlahDibulatkan

6 1 m2 MEMBERSIHKAN LOKASI ROYEKa Pembantu Tukang 0.10 org 35,000.00

JumlahDibulatkan

7 1 m2 MEMBERSIHKAN PUING-PUINGa Pembantu Tukang 0.20 org 35,000.00

JumlahDibulatkan

8 1 BH MEMBERSIHKAN TUNGGUL TANAMANa Pembantu Tukang 2.00 org 35,000.00

JumlahDibulatkan

9 1m2 PEMBUATAN JALAN MASUK PROYEKa Batu Belah 15/20 0.10 m3 145,000.00 b Koral 5/7 ( sirtu ) 0.05 m3 165,000.00 c Pasir urug 0.01 m3 145,000.00 d Pembantu Tukang 1.00 org 35,000.00

JumlahDibulatkan

10 1 m3 PEMBONGKARAN BETONa Pembantu Tukang 6.20 org 35,000.00

JumlahDibulatkan

11 1 m3 PEMBONGKARAN DINDING BATAa Pembantu Tukang 4.60 org 35,000.00

JumlahDibulatkan

12 1 M2 PEKERJAAN PAGAR PAPAN RANGKA BALOKa Papan kayu Borneo 0.02 m3 3,300,000.00 b Balok kayu borneo 5/7 0.02 m3 3,200,000.00 c Pasir Beton 0.08 m3 180,000.00 d Splitz (batu pecah) 0.15 m3 178,000.00 e Semen abu - abu 0.50 sak 48,000.00 f Tukang Kayu 0.13 org 45,000.00 g Pembantu Tukang 0.38 org 35,000.00

Jumlah

Dibulatkan

Page 6: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUAN

II PEKERJAAN TANAH1 1 m3 GALIAN TANAH SEDALAM 1 M

a Pembantu Tukang 0.40 org 35,000.00 b Tukang Gali 0.02 org 36,000.00

JumlahDibulatkan

2 1 m3 GALIAN TANAH SEDALAM 2 Ma Pembantu Tukang 0.53 org 35,000.00 b Tukang Gali 0.02 org 36,000.00

JumlahDibulatkan

3 1 m3 GALIAN TANAH SEDALAM 3 Ma Pembantu Tukang 0.74 org 35,000.00 b Tukang Gali 0.02 org 36,000.00

JumlahDibulatkan

4 1 m3 GALIAN TANAH KERAS SEDALAM 1 Ma Pembantu Tukang 0.45 org 35,000.00 b Tukang Gali 0.02 org 36,000.00

JumlahDibulatkan

5 1 m2 PEKERJAAN PENGUPASAN TANAH SETEBAL 10 CMa Pembantu Tukang 0.05 org 35,000.00 b Tukang Gali 0.02 org 36,000.00

JumlahDibulatkan

6 1 m3 PEMBUANGAN TANAH SEJAUH 150 Ma Pembantu Tukang 0.42 org 35,000.00 b Tukang Gali 0.02 org 36,000.00

JumlahDibulatkan

7 1 m3 URUGAN TANAH KEMBALI a Pembantu Tukang 0.19 org 35,000.00 b Tukang Gali 0.02 org 36,000.00

JumlahDibulatkan

8 1 m3 PEMADATAN TANAHa Pembantu Tukang 0.50 org 35,000.00 b Tukang Gali 0.02 org 36,000.00

JumlahDibulatkan

9 1 m3 URUGAN PASIRa Pasir Urug 1.20 m3 145,000.00 b Pembantu Tukang 0.30 org 35,000.00

Page 7: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANc Tukang Gali 0.02 org 36,000.00

JumlahDibulatkan

10 1 m3 URUGAN TANAH a Tanah Urug 1.20 m3 112,000.00 b Pembantu Tukang 0.30 org 35,000.00 c Tukang Gali 0.02 org 36,000.00

JumlahDibulatkan

11 1 m3 URUGAN SIRTUa Sirtu ( koral ) 1.20 m3 165,000.00 b Pembantu Tukang 0.25 org 35,000.00 c Tukang Gali 0.02 org 36,000.00

Jumlah

Dibulatkan

III PEKERJAAN PONDASI1 1 m3 PASANG PONDASI BT KALI , 1 Pc : 3 Ps

a Batu Belah 1.10 m3 145,000.00 b Semen PC (abu-abu) 4.04 sak 48,000.00 c Pasir Pasang 0.49 m3 165,000.00 d Pembantu Tukang 1.50 org 35,000.00 e Tukang Batu 0.60 org 45,000.00

JumlahDibulatkan

2 1 m3 PASANG PONDASI BT KALI , 1 Pc : 4 Psa Batu Belah 1.10 m3 145,000.00 b Semen PC (abu-abu) 3.26 sak 48,000.00 c Pasir Pasang 0.52 m3 165,000.00 d Pembantu Tukang 1.50 org 35,000.00 e Tukang Batu 0.60 org 45,000.00

JumlahDibulatkan

3 1 m3 PASANG PONDASI BT KALI , 1 Pc : 5 Psa Batu Belah 1.10 m3 145,000.00 b Semen PC (abu-abu) 2.72 sak 48,000.00 c Pasir Pasang 0.54 m3 165,000.00 d Pembantu Tukang 1.50 org 35,000.00 e Tukang Batu 0.60 org 45,000.00

JumlahDibulatkan

4 1 m3 PASANG PONDASI BATU KOSONG ( AANSTAMPING )a Batu Belah 1.20 m3 145,000.00 b Pasir Urug 0.30 m3 145,000.00 c Pembantu Tukang 0.78 org 35,000.00 d Tukang Batu 0.39 org 45,000.00

JumlahDibulatkan

5 1 m3 MEMBUAT BETON BERTULANG UNTUK PONDASI 1 Pc : 2 Ps : 3 Kr

Page 8: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANa Semen PC (abu-abu) 6.72 sak 48,000.00 b Pasir Beton 0.54 m3 180,000.00 c Splitz (batu pecah) 0.81 m3 178,000.00 d Pembantu Tukang 2.00 org 35,000.00 e Tukang Batu 0.35 org 45,000.00

JumlahDibulatkan

6 1 kg PENULANGAN BETON PONDASIa Besi Beton Polos 1.05 kg 8,500.00 b Kawat Beton 0.02 kg 11,200.00 c Pembantu Tukang 0.01 org 35,000.00 d Tukang Besi 0.01 org 45,000.00

JumlahDibulatkan

7 1 m2 PEKERJAAN BEKISTING UNTUK PONDASIa Papan kayu terentang 0.04 m3 2,300,000.00 b Paku 5 - 12 cm 0.30 kg 4,300.00 c Pelumas begisting (oli/minyak) 0.10 Ltr 12,000.00 d Pembantu Tukang 0.30 org 35,000.00 e Tukang Kayu 0.26 org 45,000.00

JumlahDibulatkan

8 1 m3 PASANG PONDASI CYCLOOP (60 %BETON : 40% BATU KALI)a Besi Beton Polos 50.00 kg 8,500.00 b Semen PC (abu-abu) 4.04 sak 48,000.00 c Pasir Beton 0.32 m3 180,000.00 d Splitz (batu pecah) 0.49 m3 178,000.00 e Kawat Beton 0.80 kg 11,200.00 f Batu Belah 0.40 m3 145,000.00 g Pembantu Tukang 2.00 org 35,000.00 h Tukang Batu 0.85 org 45,000.00

JumlahDibulatkan

9 1 m3 PASANG PONDASI SUMURAN DIAMETER 100 cma Batu Belah 0.45 m3 145,000.00 b Semen PC (abu-abu) 5.60 sak 48,000.00 c Pasir Beton 0.45 m3 180,000.00 d Splitz (batu pecah) 0.67 m3 178,000.00 e Pembantu Tukang 2.38 org 35,000.00 f Tukang Batu 0.30 org 45,000.00

JumlahDibulatkan

10 1 M¹ PEMBUATAN PONDASI TIANG BETON BERTULANG UKURAN 40 X 40 Cma Pasir Beton 0.10 m3 180,000.00 b Splitz (batu pecah) 0.15 m3 178,000.00 c Semen PC (abu-abu) 1.21 sak 48,000.00 d Besi Beton Polos 45.00 kg 8,500.00 e Kawat Beton 0.90 kg 11,200.00 f Balok kayu borneo super 5/7 0.03 m3 3,200,000.00 g Papan kayu terentang 0.01 m3 3,300,000.00 h Paku 5 - 12 cm 0.12 kg 11,000.00

Page 9: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANi Pelumas begisting (oli/minyak) 0.09 Ltr 12,000.00 j Plamir Tembok 0.24 kg 19,000.00 k Pembantu Tukang 1.00 org 35,000.00 l Tukang Batu 0.67 org 45,000.00

JumlahDibulatkan

11 1 M¹ PEMBUATAN PONDASI TIANG BETON BERTULANG UKURAN 35 X 35 CMa Pasir Beton 0.08 m3 180,000.00 b Splitz (batu pecah) 0.13 m3 178,000.00 c Semen PC (abu-abu) 0.98 sak 48,000.00 d Besi Beton Polos 34.50 kg 8,500.00 e Kawat Beton 0.70 kg 11,200.00 f Balok kayu borneo super 5/7 0.03 m3 3,200,000.00 g Papan kayu terentang 0.01 m3 3,300,000.00 h Paku 5 - 12 cm 0.12 kg 11,000.00 i Pelumas begisting (oli/minyak) 0.09 Ltr 12,000.00 j Plamir Tembok 0.20 kg 19,000.00 k Pembantu Tukang 0.80 org 35,000.00 l Tukang Batu 0.50 org 45,000.00

JumlahDibulatkan

12 1 m3 MEMBUAT PONDASI TIANG PANCANG UKURAN 25 X 25a Pasir Beton 0.06 m3 180,000.00 b Splitz (batu pecah) 0.11 m3 178,000.00 c Semen PC (abu-abu) 0.82 sak 48,000.00 d Besi Beton Polos 34.50 kg 8,500.00 e Kawat Beton 0.60 kg 11,200.00 f Balok kayu borneo super 5/7 0.03 m3 3,200,000.00 g Papan kayu terentang 0.01 m3 3,300,000.00 h Paku 5 - 12 cm 0.11 kg 11,000.00 i Pelumas begisting (oli/minyak) 0.08 Ltr 12,000.00 j Plamir Tembok 0.20 kg 19,000.00 k Pembantu Tukang 0.80 org 35,000.00 l Tukang Batu 0.50 org 45,000.00

Jumlah

Dibulatkan

13 1 m3 MEMBUAT PONDASI PLAT BETON (PENULANGAN 125 kg + BEKISTING )a Papan kayu terentang 0.20 m3 2,300,000.00 b Paku 5 - 12 cm 1.50 kg 11,000.00 c Pelumas begisting (oli/minyak) 0.40 Ltr 12,000.00 d Besi Beton Polos 125.00 kg 8,500.00 e Kawat Beton 2.25 kg 11,200.00 f Semen PC (abu-abu) 6.46 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Pembantu Tukang 3.90 org 35,000.00 j Tukang Batu 0.35 org 45,000.00 k Tukang Kayu 1.04 org 45,000.00 l Tukang Besi 1.05 org 45,000.00

JumlahDibulatkan

Page 10: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUAN14 1 m3 MEMBUAT PONDASI PLAT BETON (PENULANGAN 150 kg + BEKISTING )

a Papan kayu terentang 0.20 m3 2,300,000.00 b Paku 5 - 12 cm 1.50 kg 11,000.00 c Pelumas begisting (oli/minyak) 0.40 ltr 12,000.00 d Besi Beton Polos Polos 150.00 kg 8,500.00 e Kawat Beton 2.25 kg 11,200.00 f Semen PC (abu-abu) 6.46 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Pembantu Tukang 4.00 org 35,000.00 j Tukang Batu 0.40 org 45,000.00 k Tukang Kayu 1.00 org 45,000.00 l Tukang Besi 1.00 org 45,000.00

JumlahDibulatkan

15 1 m3 MEMBUAT PONDASI BETON BOREPILE (PENULANGAN 125 kg + BEKISTING )a Papan kayu terentang 0.20 m3 2,300,000.00 b Paku 5 - 12 cm 1.50 kg 11,000.00 c Pelumas begisting (oli/minyak) 0.40 ltr 12,000.00 d Besi Beton Polos Polos 125.00 kg 8,500.00 e Kawat Beton 2.10 kg 11,200.00 f Semen PC (abu-abu) 6.46 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Pembantu Tukang 3.90 org 35,000.00 j Tukang Batu 0.40 org 45,000.00 k Tukang Kayu 1.00 org 45,000.00 l Tukang Besi 1.00 org 45,000.00

JumlahDibulatkan

16 1 m3 MEMBUAT PONDASI BETON BOREPILE (PENULANGAN 150 kg + BEKISTING )a Papan kayu terentang 0.20 m3 2,300,000.00 b Paku 5 - 12 cm 1.50 kg 11,000.00 c Pelumas begisting (oli/minyak) 0.40 ltr 12,000.00 d Besi Beton Polos 150.00 kg 8,500.00 e Kawat Beton 2.25 kg 11,200.00 f Semen PC (abu-abu) 6.46 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Pembantu Tukang 4.00 org 35,000.00 j Tukang Batu 0.40 org 45,000.00 k Tukang Kayu 1.00 org 45,000.00 l Tukang Besi 1.00 org 45,000.00

Jumlah

Dibulatkan

Page 11: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANIV PEKERJAAN BETON NON STRUKTUR DAN BETON STRUKTUR

A PEKERJAAN BETON 1 1 m3 MEMBUAT BETON NON STRUKTUR, 1 Pc : 3 Ps : 5 Splt

a Semen PC (abu-abu) 4.36 sak 48,000.00 b Pasir Beton 0.52 m3 180,000.00 c Splitz (batu pecah) 0.87 m3 178,000.00 d Pembantu Tukang 2.00 org 35,000.00 e Tukang Batu 0.35 org 45,000.00

JumlahDibulatkan

2 1 m3 MEMBUAT BETON STRUKTUR 1 Pc : 2 Ps : 4 Splta Semen PC (abu-abu) 4.64 sak 48,000.00 b Pasir Beton 0.52 m3 180,000.00 c Splitz (batu pecah) 0.78 m3 178,000.00 d Pembantu Tukang 2.00 org 35,000.00 e Tukang Batu 0.35 org 45,000.00

JumlahDibulatkan

3 1 m3 MEMBUAT BETON STRUKTUR 1 Pc : 2 Ps : 3 Splta Semen PC (abu-abu) 6.72 sak 48,000.00 b Pasir Beton 0.54 m3 180,000.00 c Splitz (batu pecah) 0.81 m3 178,000.00 d Pembantu Tukang 2.00 org 35,000.00 e Tukang Batu 0.35 org 45,000.00

JumlahDibulatkan

4 1 m3 MEMBUAT BETON STRUKTUR DENGAN MUTU K 225a Semen PC (abu-abu) 7.76 sak 48,000.00 b Pasir Beton 0.65 m3 180,000.00 c Splitz (batu pecah) 0.65 m3 178,000.00 d Pembantu Tukang 2.00 org 35,000.00 e Tukang Batu 0.35 org 45,000.00

JumlahDibulatkan

5 1 m3 MEMBUAT BETON STRUKTUR DENGAN MUTU K 275a Semen PC (abu-abu) 8.00 sak 48,000.00 b Pasir Beton 0.55 m3 180,000.00 c Splitz (batu pecah) 0.70 m3 178,000.00 d Pembantu Tukang 2.02 org 35,000.00 e Tukang Batu 0.40 org 45,000.00

JumlahDibulatkan

B PEKERJAAN PEMBESIAN1 1 kg PENULANGAN BETON/BESI BETON POLOS

a Besi Beton Polos 1.05 kg 8,500.00 b Kawat Beton 0.02 kg 11,200.00 c Pembantu Tukang 0.01 org 35,000.00 d Tukang Besi 0.01 org 45,000.00

JumlahDibulatkan

2 1 kg PENULANGAN BETON/BESI BETON ULIR

Page 12: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANa Besi Beton Ulir 1.10 kg 8,900.00 b Kawat Beton 0.02 kg 11,200.00 c Pembantu Tukang 0.01 org 35,000.00 d Tukang Besi 0.02 org 45,000.00

JumlahDibulatkan

C PEKERJAAN BEGISTING1 1 m2 PASANG BEKISTING UNTUK SLOOF

a Papan kayu terentang 0.05 m3 2,300,000.00 b Paku 5 - 12 cm 0.30 kg 11,000.00 c Pelumas begisting (oli/minyak) 0.10 Ltr 12,000.00 d Pembantu Tukang 0.30 org 35,000.00 e Tukang Kayu 0.26 org 45,000.00

JumlahDibulatkan

2 1 m2 PASANG BEKISTING UNTUK KOLOMa Papan kayu terentang 0.04 m3 2,300,000.00 b Paku 5 - 12 cm 0.40 kg 11,000.00 c Pelumas begisting (oli/minyak) 0.20 Ltr 12,000.00 d Balok Kayu Borneo 0.04 m3 3,200,000.00 e Multiplex 120 x 240 x 9 mm 0.35 lbr 105,000.00 f Pembantu Tukang 0.30 org 35,000.00 g Tukang Kayu 0.33 org 45,000.00

JumlahDibulatkan

3 1 m2 PASANG BEKISTING UNTUK BALOKa Papan kayu terentang 0.04 m3 2,300,000.00 b Paku 5 - 12 cm 0.40 kg 11,000.00 c Pelumas begisting (oli/minyak) 0.20 Ltr 12,000.00 d Balok Kayu Borneo 0.04 m3 3,200,000.00 e Multiplex 120 x 240 x 9 mm 0.35 lbr 105,000.00 f Pembantu Tukang 0.32 org 35,000.00 g Tukang Kayu 0.33 org 45,000.00

JumlahDibulatkan

4 1 m2 PASANG BEKISTING UNTUK PLAT LANTAIa Papan kayu terentang 0.04 m3 2,300,000.00 b Paku 5 - 12 cm 0.40 kg 11,000.00 c Pelumas begisting (oli/minyak) 0.20 Ltr 12,000.00 d Balok Kayu Borneo 0.04 m3 3,200,000.00 e Multiplex 120 x 240 x 9 mm 0.35 lbr 105,000.00 f Pembantu Tukang 0.32 org 35,000.00 g Tukang Kayu 0.33 org 45,000.00

JumlahDibulatkan

5 1 m2 PASANG BEKISTING UNTUK TANGGAa Papan kayu terentang 0.03 m3 2,300,000.00 b Paku 5 - 12 cm 0.40 kg 11,000.00 c Pelumas begisting (oli/minyak) 0.15 Ltr 12,000.00 d Balok Kayu Borneo 0.02 m3 3,200,000.00 e Multiplex 120 x 240 x 9 mm 0.35 lbr 105,000.00 f Pembantu Tukang 0.32 org 35,000.00

Page 13: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANg Tukang Kayu 0.33 org 45,000.00

JumlahDibulatkan

D PEKERJAAN BETON BERTULANG1 1 m3 MEMBUAT SLOOF BETON BERTULANG ( 200 kg BESI + BEKISTING ) K225

a Papan kayu terentang 0.27 m3 2,300,000.00 b Paku 5 - 12 cm 2.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 0.60 Ltr 12,000.00 d Besi Beton Polos 200.00 kg 8,500.00 e Kawat Beton 3.00 kg 11,200.00 f Semen PC (abu-abu) 8.00 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Pembantu Tukang 4.50 org 35,000.00 j Tukang Batu 0.35 org 45,000.00 k Tukang Kayu 1.56 org 45,000.00 l Tukang Besi 1.40 org 45,000.00

JumlahDibulatkan

2 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 125 kg BESI + BEKISTING )a Papan kayu terentang 0.40 m3 2,300,000.00 b Paku 5 - 12 cm 4.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 d Besi Beton Polos 125.00 kg 8,500.00 e Kawat Beton 4.50 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.30 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 k Pembantu Tukang 7.30 org 35,000.00 l Tukang Batu 0.35 org 45,000.00

m Tukang Kayu 3.30 org 45,000.00 n Tukang Besi 2.10 org 45,000.00

JumlahDibulatkan

3 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 150 kg BESI + BEKISTING )a Papan kayu terentang 0.40 m3 2,300,000.00 b Paku 5 - 12 cm 4.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 d Besi Beton Polos 150.00 kg 8,500.00 e Kawat Beton 4.50 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.30 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 k Pembantu Tukang 7.30 org 35,000.00 l Tukang Batu 0.35 org 45,000.00

m Tukang Kayu 3.30 org 45,000.00 n Tukang Besi 2.10 org 45,000.00

Page 14: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANJumlahDibulatkan

4 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 160 kg BESI + BEKISTING )a Papan kayu terentang 0.40 m3 2,300,000.00 b Paku 5 - 12 cm 4.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 d Besi Beton Polos 160.00 kg 8,500.00 e Kawat Beton 4.50 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.30 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 k Pembantu Tukang 7.30 org 35,000.00 l Tukang Batu 0.35 org 45,000.00

m Tukang Kayu 3.30 org 45,000.00 n Tukang Besi 2.10 org 45,000.00

JumlahDibulatkan

5 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 175 kg BESI + BEKISTING )a Papan kayu terentang 0.40 m3 2,300,000.00 b Paku 5 - 12 cm 4.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 d Besi Beton Polos 175.00 kg 8,500.00 e Kawat Beton 4.50 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.30 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 k Pembantu Tukang 7.30 org 35,000.00 l Tukang Batu 0.35 org 45,000.00

m Tukang Kayu 3.30 org 45,000.00 n Tukang Besi 2.10 org 45,000.00

JumlahDibulatkan

6 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 200 kg BESI + BEKISTING )a Papan kayu terentang 0.40 m3 2,300,000.00 b Paku 5 - 12 cm 4.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 d Besi Beton Polos 200.00 kg 8,500.00 e Kawat Beton 4.50 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.30 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 k Pembantu Tukang 7.30 org 35,000.00 l Tukang Batu 0.35 org 45,000.00

m Tukang Kayu 3.30 org 45,000.00 n Tukang Besi 2.10 org 45,000.00

JumlahDibulatkan

Page 15: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUAN7 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 250 kg BESI + BEKISTING )

a Papan kayu terentang 0.40 m3 2,300,000.00 b Paku 5 - 12 cm 4.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 d Besi Beton Polos 250.00 kg 8,500.00 e Kawat Beton 4.50 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.30 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 k Pembantu Tukang 7.30 org 35,000.00 l Tukang Batu 0.35 org 45,000.00

m Tukang Kayu 3.30 org 45,000.00 n Tukang Besi 2.10 org 45,000.00

JumlahDibulatkan

8 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 300 kg BESI + BEKISTING )a Papan kayu terentang 0.40 m3 2,300,000.00 b Paku 5 - 12 cm 4.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 2.00 Ltr 12,000.00 d Besi Beton Polos 300.00 kg 8,500.00 e Kawat Beton 4.50 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.30 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 3.50 lbr 105,000.00 k Pembantu Tukang 7.30 org 35,000.00 l Tukang Batu 0.35 org 45,000.00

m Tukang Kayu 3.30 org 45,000.00 n Tukang Besi 2.10 org 45,000.00

JumlahDibulatkan

9 1 m3 MEMBUAT BALOK BETON BERTULANG ( 125 kg BESI + BEKISTING )a Papan kayu terentang 0.32 m3 2,300,000.00 b Paku 5 - 12 cm 3.20 kg 11,000.00 c Pelumas begisting (oli/minyak) 1.60 Ltr 12,000.00 d Besi Beton Polos 125.00 kg 8,500.00 e Kawat Beton 2.25 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.12 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 2.80 lbr 105,000.00 k Dolken Ø-8 Cm atau kayu 4 x 6 cm / 4m 32.00 btg 18,600.00 l Pembantu Tukang 5.80 org 35,000.00

m Tukang Batu 0.35 org 45,000.00 n Tukang Kayu 2.80 org 45,000.00 o Tukang Besi 1.05 org 45,000.00

JumlahDibulatkan

10 1 m3 MEMBUAT BALOK BETON BERTULANG ( 150 kg BESI + BEKISTING )a Papan kayu terentang 0.32 m3 2,300,000.00 b Paku 5 - 12 cm 3.20 kg 11,000.00 c Pelumas begisting (oli/minyak) 1.60 Ltr 12,000.00

Page 16: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANd Besi Beton Polos 150.00 kg 8,500.00 e Kawat Beton 2.25 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.12 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 2.80 lbr 105,000.00 k Dolken Ø-8 Cm atau kayu 4 x 6 cm / 4m 32.00 btg 18,600.00 l Pembantu Tukang 5.80 org 35,000.00

m Tukang Batu 0.35 org 45,000.00 n Tukang Kayu 2.80 org 45,000.00 o Tukang Besi 1.05 org 45,000.00

JumlahDibulatkan

11 1 m3 MEMBUAT BALOK BETON BERTULANG ( 200 kg BESI + BEKISTING )a Papan kayu terentang 0.32 m3 2,300,000.00 b Paku 5 - 12 cm 3.20 kg 11,000.00 c Pelumas begisting (oli/minyak) 1.60 Ltr 12,000.00 d Besi Beton Polos 200.00 kg 8,500.00 e Kawat Beton 3.00 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 #N/A

0.14 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 2.80 lbr 105,000.00 k Dolken Ø-8 Cm atau kayu 4 x 6 cm / 4m 16.00 btg 18,600.00 l Pembantu Tukang 5.96 org 35,000.00

m Tukang Batu 0.35 org 45,000.00 n Tukang Kayu 2.80 org 45,000.00 o Tukang Besi 1.40 org 45,000.00

JumlahDibulatkan

1 1 m3 MEMBUAT BALOK BETON BERTULANG ( 250 kg BESI + BEKISTING )a Papan kayu terentang 0.32 m3 2,300,000.00 b Paku 5 - 12 cm 3.20 kg 11,000.00

Page 17: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANc Pelumas begisting (oli/minyak) 1.60 Ltr 12,000.00 d Besi Beton Polos 250.00 kg 8,500.00 e Kawat Beton 6.00 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.14 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 2.80 lbr 105,000.00 k Dolken Ø-8 Cm atau kayu 4 x 6 cm / 4m 16.00 btg 18,600.00 l Pembantu Tukang 5.96 org 35,000.00

m Tukang Batu 0.35 org 45,000.00 n Tukang Kayu 2.80 org 45,000.00 o Tukang Besi 1.40 org 45,000.00

JumlahDibulatkan

14 1 m3 MEMBUAT TANGGA BETON BERTULANG ( 200 kg BESI + BEKISTING )a Papan kayu terentang 0.25 m3 2,300,000.00 b Paku 5 - 12 cm 3.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 1.20 Ltr 12,000.00 d Besi Beton Polos 200.00 kg 8,500.00 e Kawat Beton 3.00 kg 11,200.00 f Semen PC (abu-abu) 6.45 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Balok kayu Borneo Super 0.30 m3 3,200,000.00 j Multiplex 120 x 240 x 9 mm 2.50 lbr 105,000.00 k Pembantu Tukang 5.60 org 35,000.00 l Tukang Batu 0.35 org 45,000.00

m Tukang Kayu 2.30 org 45,000.00 n Tukang Besi 1.40 org 45,000.00

JumlahDibulatkan

15 1 m3 MEMBUAT PLAT LANTAI Tb. 10 Cm BETON BERTULANG ( 100 kg BESI + BEKISTING )a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 649,600.00 b Pasang Bekisting untuk lantai 10.00 m2 289,600.00 c Besi Beton rakit 100.00 kg 8,500.00

JumlahDibulatkan

16 1 m3 MEMBUAT PLAT LANTAI Tb. 12 Cm BETON BERTULANG ( 115 kg BESI + BEKISTING )a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 649,600.00 b Pasang Bekisting untuk lantai 8.33 m2 289,600.00 c Besi Beton rakit 115.00 kg 9,900.00

JumlahDibulatkan

17 1 m3 MEMBUAT PLAT LANTAI Tb. 12 Cm BETON BERTULANG ( 125 kg BESI + BEKISTING )a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 649,600.00 b Pasang Bekisting untuk lantai 8.33 m2 289,600.00 c Besi Beton rakit 125.00 kg 9,900.00

JumlahDibulatkan

18 1 m3 MEMBUAT PLAT LANTAI Tb. 15 Cm BETON BERTULANG ( 100 kg BESI + BEKISTING )

Page 18: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANa Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 649,600.00 b Pasang Bekisting untuk lantai 6.67 m2 289,600.00 c Besi Beton rakit 100.00 kg 9,900.00

JumlahDibulatkan

19 1 m3 MEMBUAT PLAT LANTAI Tb. 20 Cm BETON BERTULANG ( 115 kg BESI + BEKISTING )a Beton bertulang camp. 1Pc : 2 Ps : 3 Kr 1.00 m3 649,600.00 b Pasang Bekisting untuk lantai 7.50 m2 289,600.00 c Besi Beton rakit 115.00 kg 9,900.00

JumlahDibulatkan

20 1 m3 MEMBUAT RING BALK BETON BERTULANG ( 175 kg BESI + BEKISTING ) K225a Papan kayu terentang 0.27 m3 2,300,000.00 b Paku 5 - 12 cm 2.00 kg 11,000.00 c Pelumas begisting (oli/minyak) 0.60 Ltr 12,000.00 d Besi Beton Polos 175.00 kg 8,500.00 e Kawat Beton 3.00 kg 11,200.00 f Semen PC (abu-abu) 8.00 sak 48,000.00 g Pasir Beton 0.52 m3 180,000.00 h Splitz (batu pecah) 0.78 m3 178,000.00 i Pembantu Tukang 4.85 org 35,000.00 j Tukang Batu 0.40 org 45,000.00 k Tukang Kayu 1.75 org 45,000.00 l Tukang Besi 1.45 org 45,000.00

Jumlah

Dibulatkan

V PEKERJAAN DINDING1 1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 3 Ps

a Bata Merah 140.00 bh 550.00 b Semen PC (abu-abu) 0.65 sak 48,000.00

Page 19: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANc Pasir Pasang 0.09 m3 165,000.00 d Pembantu Tukang 0.65 org 35,000.00 e Tukang Batu 0.20 org 45,000.00

JumlahDibulatkan

2 1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 4 Psa Bata Merah 140.00 bh 550.00 b Semen PC (abu-abu) 0.55 sak 48,000.00 c Pasir Pasang 0.09 m3 165,000.00 d Pembantu Tukang 0.65 org 35,000.00 e Tukang Batu 0.20 org 45,000.00

JumlahDibulatkan

3 1 m2 PASANGAN BATA MERAH TEBAL 1 BATA, CAMPURAN 1 Pc : 5 Psa Bata Merah 140.00 bh 550.00 b Semen PC (abu-abu) 0.45 sak 48,000.00 c Pasir Pasang 0.10 m3 165,000.00 d Pembantu Tukang 0.65 org 35,000.00 e Tukang Batu 0.20 org 45,000.00

JumlahDibulatkan

4 1 m2 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 3 Psa Bata Merah 70.00 bh 550.00 b Semen PC (abu-abu) 0.29 sak 48,000.00 c Pasir Pasang 0.04 m3 165,000.00 d Pembantu Tukang 0.32 org 35,000.00 e Tukang Batu 0.10 org 45,000.00

JumlahDibulatkan

5 1 m2 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 4 Psa Bata Merah 70.00 bh 550.00 b Semen PC (abu-abu) 0.25 sak 48,000.00 c Pasir Pasang 0.05 m3 165,000.00 d Pembantu Tukang 0.32 org 35,000.00 e Tukang Batu 0.10 org 45,000.00

JumlahDibulatkan

6 1 m2 PASANGAN BATA MERAH TEBAL ½ BATA, CAMPURAN 1 Pc : 5 Psa Bata Merah 70.00 bh 550.00 b Semen PC (abu-abu) 0.22 sak 48,000.00 c Pasir Pasang 0.05 m3 165,000.00 d Pembantu Tukang 0.32 org 35,000.00 e Tukang Batu 0.10 org 45,000.00

JumlahDibulatkan

7 1 m2 PASANG DINDING BATA ROOSTER / BATA TERAWANG a Rooster / Terawang ukuran 12 x 11 x 24 37.00 bh 3,500.00 b Semen PC (abu-abu) 0.27 sak 48,000.00 c Pasir Pasang 0.04 m3 165,000.00 d Pembantu Tukang 0.30 org 35,000.00 e Tukang Batu 0.10 org 45,000.00

Page 20: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANJumlahDibulatkan

8 1 m2 PASANG DINDING GLASSBLOCKa Glassblock ukuran 18 x 18 cm 30.00 bh 17,500.00 b Semen Putih 0.27 sak 4,200.00 c Pembantu Tukang 0.30 org 35,000.00 d Tukang Batu 0.10 org 45,000.00

JumlahDibulatkan

9 1 m2 PASANGAN BATACO PUTIH, CAMPURAN 1 Pc : 5 Psa Bataco putih 15.00 bh 2,000.00 b Semen PC (abu-abu) 0.25 sak 48,000.00 c Pasir Pasang 0.03 m3 165,000.00 d Pembantu Tukang 0.30 org 35,000.00 e Tukang Batu 0.15 org 45,000.00

JumlahDibulatkan

10 1 m2 PASANGAN BATACO PRES SEMEN, CAMPURAN 1 Pc : 5 Psa Bataco press semen 15.00 bh 2,250.00 b Semen PC (abu-abu) 0.20 sak 48,000.00 c Pasir Pasang 0.02 m3 165,000.00 d Pembantu Tukang 0.30 org 35,000.00 e Tukang Batu 0.15 org 45,000.00

JumlahDibulatkan

11 1 m2 PASANGAN BATA RINGAN ( HEBEL/CELCON ).a 8.00 bh 2,500.00 b Semen Instan 11.45 kg 6,500.00 c Pembantu Tukang 0.30 org 35,000.00 d Tukang Batu 0.20 org 45,000.00

JumlahDibulatkan

VI PEKERJAAN PLESTERAN/ACCI1 1 m2 PLESTERAN CAMPURAN 1 Pc : 2 Ps TEBAL 1,5 cm

a Semen PC (abu-abu) 0.14 sak 48,000.00 b Pasir Pasang 0.02 m3 165,000.00 c Pembantu Tukang 0.20 org 35,000.00 d Tukang Batu 0.15 org 45,000.00

Bata Ringan ( hebel/celcon )

Page 21: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANJumlahDibulatkan

2 1 m2 PLESTERAN CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cma Semen PC (abu-abu) 0.13 sak 48,000.00 b Pasir Pasang 0.02 m3 165,000.00 c Pembantu Tukang 0.20 org 35,000.00 d Tukang Batu 0.15 org 45,000.00

JumlahDibulatkan

3 1 m2 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 1,5 cma Semen PC (abu-abu) 0.10 sak 48,000.00 b Pasir Pasang 0.02 m3 165,000.00 c Pembantu Tukang 0.20 org 35,000.00 d Tukang Batu 0.15 org 45,000.00

JumlahDibulatkan

4 1 m2 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cma Semen PC (abu-abu) 0.09 sak 48,000.00 b Pasir Pasang 0.02 m3 165,000.00 c Pembantu Tukang 0.20 org 35,000.00 d Tukang Batu 0.15 org 45,000.00

JumlahDibulatkan

5 1 m2 PLESTERAN CAMPURAN 1 Pc : 4 Ps TEBAL 2,0 cma Semen PC (abu-abu) 0.17 sak 48,000.00 b Pasir Pasang 0.03 m3 165,000.00 c Pembantu Tukang 0.22 org 35,000.00 d Tukang Batu 0.16 org 45,000.00

JumlahDibulatkan

6 1 m2 PLESTERAN CAMPURAN 1 Pc : 5 Ps TEBAL 2,0 cma Semen PC (abu-abu) 0.15 sak 48,000.00 b Pasir Pasang 0.03 m3 165,000.00 c Pembantu Tukang 0.25 org 35,000.00 d Tukang Batu 0.20 org 45,000.00

JumlahDibulatkan

7 1 m2 BERAPEN CAMPURAN 1 Pc : 5 Ps TEBAL 1,5 cma Semen PC (abu-abu) 0.11 sak 48,000.00 b Pasir Pasang 0.03 m3 165,000.00 c Pembantu Tukang 0.15 org 35,000.00 d Tukang Batu 0.07 org 45,000.00

JumlahDibulatkan

8 1 m2 PLESTERAN BETON CAMPURAN 1 Pc : 2 Ps TEBAL 1,5 cma Semen PC (abu-abu) 0.19 sak 48,000.00 b Pasir Pasang 0.02 m3 165,000.00 c Pembantu Tukang 0.26 org 35,000.00 d Tukang Batu 0.20 org 45,000.00

JumlahDibulatkan

Page 22: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUAN9 1 m2 PLESTERAN BETON CAMPURAN 1 Pc : 3 Ps TEBAL 1,5 cm

a Semen PC (abu-abu) 0.15 sak 48,000.00 b Pasir Pasang 0.02 m3 165,000.00 c Pembantu Tukang 0.26 org 35,000.00 d Tukang Batu 0.20 org 45,000.00

JumlahDibulatkan

10 1 m2 PLESTERAN SKONENG CAMPURAN 1 Pc : 2 Ps a Semen PC (abu-abu) 0.01 sak 48,000.00 b Pasir Pasang 0.01 m3 165,000.00 c Pembantu Tukang 0.06 org 35,000.00 d Tukang Batu 0.04 org 45,000.00

JumlahDibulatkan

11 1 m2 ACCIAN PLESTERANa Semen PC (abu-abu) 0.08 sak 48,000.00 b Pembantu Tukang 0.14 org 35,000.00 c Tukang batu 0.11 org 45,000.00

JumlahDibulatkan

12 1 m2 PLESTERAN SIAR CAMPURAN 1 Pc : 2 Ps a Semen PC (abu-abu) 0.09 sak 48,000.00 b Pasir Pasang 0.02 m3 165,000.00 c Pembantu Tukang 0.15 org 35,000.00 d Tukang Batu 0.07 org 45,000.00

Jumlah

Dibulatkan

VII PEKERJAAN PELAPIS LANTAI1 1 m2 PASANG LANTAI KERAMIK UKURAN 40 x 40 cm POLISHED

a Keramik ukuran 40 x 40 cm 1.00 m2 205,000.00 b Semen PC (abu-abu) 0.16 sak 48,000.00 c Pasir pasang 0.02 m3 165,000.00 d Semen warna 0.02 kg 4,200.00 e Pembantu Tukang 0.25 org 35,000.00 f Tukang batu 0.12 org 45,000.00

Page 23: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANJumlahDibulatkan

2 1 m2 PASANG LANTAI KERAMIK UKURAN 40 x 40 cm UNPOLISHa Keramik ukuran 40 x 40 cm 1.00 m2 195,000.00 b Semen PC (abu-abu) 0.16 sak 48,000.00 c Pasir pasang 0.02 m3 165,000.00 d Semen warna 0.02 kg 4,200.00 e Pembantu Tukang 0.26 org 35,000.00 f Tukang batu 0.13 org 45,000.00

JumlahDibulatkan

3 1 m2 PASANG LANTAI KERAMIK UKURAN 60 x 60 cm a Keramik ukuran 60 x 60 cm 1.00 m2 265,000.00 b Semen PC (abu-abu) 0.18 sak 48,000.00 c Pasir pasang 0.02 m3 165,000.00 d Semen warna 0.01 kg 4,200.00 e Pembantu Tukang 0.25 org 35,000.00 f Tukang batu 0.12 org 45,000.00

JumlahDibulatkan

4 1 m2 PASANG LANTAI KERAMIK UKURAN 60 x 90 cm a Keramik ukuran 60 x 90 cm 1.00 m2 292,000.00 b Semen PC (abu-abu) 0.17 sak 48,000.00 c Pasir pasang 0.02 m3 165,000.00 d Semen warna 0.02 kg 4,200.00 e Pembantu Tukang 0.26 org 35,000.00 f Tukang batu 0.14 org 45,000.00

JumlahDibulatkan

5 1 m2 PASANG LANTAI KERAMIK 10 x 20 cma Keramik lantai 10 x 20 cm 1.00 m2 35,000.00 b Semen PC ( abu-abu ) 0.18 sak 48,000.00 c Pasir pasang 0.02 m3 165,000.00 d Semen warna 0.02 kg 4,200.00 e Pembantu Tukang 0.22 org 35,000.00 f Tukang batu 0.40 org 45,000.00

JumlahDibulatkan

6 1 m2 PASANG LANTAI KERAMIK POLOS 20 x 20 cma Keramik polos 20 x 20 cm 1.00 m2 38,000.00 b Semen PC (abu-abu) 0.17 sak 48,000.00 c Pasir pasang 0.02 m3 165,000.00 d Semen warna 0.02 kg 4,200.00 e Pembantu Tukang 0.30 org 35,000.00 f Tukang batu 0.15 org 45,000.00

JumlahDibulatkan

7 1 m2 PASANG LANTAI KERAMIK MOTIF 20 x 20 cma Keramik motif 20 x 20 cm 1.00 m2 38,500.00 b Semen PC (abu-abu) 0.17 sak 48,000.00 c Pasir pasang 0.02 m3 165,000.00

Page 24: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANd Semen warna 0.02 kg 4,200.00 e Pembantu Tukang 0.30 org 35,000.00 f Tukang batu 0.15 org 45,000.00

JumlahDibulatkan

8 1 m2 PASANG LANTAI KERAMIK POLOS 30 x 30 cma Keramik polos 30 x 30 cm 1.00 m2 39,000.00 b Semen PC (abu-abu) 0.16 sak 48,000.00 c Pasir pasang 0.02 m3 165,000.00 d Semen warna 0.02 kg 4,200.00 e Pembantu Tukang 0.25 org 35,000.00 f Tukang batu 0.12 org 45,000.00

JumlahDibulatkan

9 1 m2 PASANG LANTAI KERAMIK MOTIF 30 x 30 cma Keramik motif 30 x 30 cm 1.00 m2 41,000.00 b Semen PC (abu-abu) 0.16 sak 48,000.00 c Pasir pasang 0.02 m3 165,000.00 d Semen warna 0.02 kg 4,200.00 e Pembantu Tukang 0.25 org 35,000.00 f Tukang batu 0.12 org 45,000.00

JumlahDibulatkan

10 1 m2 PASANG LANTAI MARMERa Marmer standart 1.00 m2 133,000.00 b Semen PC (abu-abu) 0.48 sak 48,000.00 c Pasir pasang 0.10 m3 165,000.00 d Semen warna 0.20 sak 4,200.00 e Pembantu Tukang 0.62 org 35,000.00 f Tukang batu 0.35 org 45,000.00

JumlahDibulatkan

11 1 m2 PASANG LANTAI PARQUET JATIa Parquet jati 1.05 m2 250,000.00 b Lem vinyl 0.60 kg 30,800.00 c Pembantu Tukang 0.65 org 35,000.00 d Tukang 0.35 org 45,000.00

JumlahDibulatkan

12 1 m2 PASANG LANTAI GRANITa Granit Standart 1.00 m2 600,000.00 b Semen PC (abu-abu) 0.48 sak 48,000.00 c Pasir pasang 0.08 m3 165,000.00 d Semen warna 0.10 sak 4,200.00 e Pembantu Tukang 0.60 org 35,000.00 f Tukang batu 0.48 org 45,000.00

JumlahDibulatkan

VIII PEKERJAAN PELAPIS DINDING

Page 25: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUAN1 1 m2 PASANG DINDING KERAMIK MOTIF 10 x 20 cm

a Keramik motif 10 x 20 cm 1.00 m2 36,500.00 b Semen PC ( abu-abu ) 0.18 sak 48,000.00 c Pasir pasang 0.02 m3 165,000.00 d Semen warna 0.02 kg 4,200.00 e Pembantu Tukang 0.22 org 35,000.00 f Tukang batu 0.40 org 45,000.00

JumlahDibulatkan

2 1 m2 PASANG DINDING KERAMIK POLOS 10 x 20 cma Keramik polos 10 x 20 cm 1.00 m2 36,000.00 b Semen PC ( abu-abu ) 0.18 sak 48,000.00 c Pasir pasang 0.02 m3 165,000.00 d Semen warna 0.02 kg 4,200.00 e Pembantu Tukang 0.22 org 35,000.00 f Tukang batu 0.40 org 45,000.00

JumlahDibulatkan

3 1 m2 PASANG DINDING KERAMIK MOTIF 20 x 20 cma Keramik motif 20 x 20 cm 1.00 m2 38,500.00 b Semen PC ( abu-abu ) 0.17 sak 48,000.00 c Pasir pasang 0.02 m3 165,000.00 d Semen warna 0.02 kg 4,200.00 e Pembantu Tukang 0.20 org 35,000.00 f Tukang batu 0.39 org 45,000.00

JumlahDibulatkan

4 1 m2 PASANG DINDING KERAMIK POLOS 20 x 20 cma Keramik polos 20 x 20 cm 1.00 m2 38,000.00 b Semen PC ( abu-abu ) 0.17 sak 48,000.00 c Pasir pasang 0.02 m3 165,000.00 d Semen warna 0.02 kg 4,200.00 e Pembantu Tukang 0.20 org 35,000.00 f Tukang batu 0.39 org 45,000.00

JumlahDibulatkan

5 1 m2 PASANG DINDING KERAMIK POLOS 20 x 25 cma Keramik polos 20 x 25 cm 1.00 m2 38,000.00 b Semen PC ( abu-abu ) 0.16 sak 48,000.00 c Pasir pasang 0.02 m3 165,000.00 d Semen warna 0.01 kg 4,200.00 e Pembantu Tukang 0.19 org 35,000.00 f Tukang batu 0.38 org 45,000.00

JumlahDibulatkan

6 1 m2 PASANG DINDING KERAMIK MOTIF 20 x 25 cma Keramik motif 20 x 25 cm 1.00 m2 38,500.00 b Semen PC ( abu-abu ) 0.16 sak 48,000.00 c Pasir pasang 0.02 m3 165,000.00 d Semen warna 0.01 kg 4,200.00 e Pembantu Tukang 0.19 org 35,000.00

Page 26: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANf Tukang batu 0.38 org 45,000.00

JumlahDibulatkan

7 1 m2 PASANG DINDING MARMERa Marmer Standart 1.00 m2 133,000.00 b Paku sekrup 4.00 bh 560.00 c Semen PC ( abu-abu ) 0.25 sak 48,000.00 d Pasir pasang 0.03 m3 165,000.00 e Semen warna 1.50 kg 4,200.00 f Kawat ikat 0.03 kg 11,200.00 g Paku 0.03 kg 11,000.00 h Pembantu Tukang 0.72 org 35,000.00 i Tukang batu 0.65 org 45,000.00

JumlahDibulatkan

8 1 m2 PASANG DINDING GRANITa Granit Standart 1.00 m2 600,000.00 b Paku sekrup 2.00 bh 560.00 c Semen PC ( abu-abu ) 0.25 sak 48,000.00 d Pasir pasang 0.03 m3 165,000.00 e Semen warna 1.50 kg 4,200.00 f Kawat ikat 0.03 kg 11,200.00 g Paku 0.03 kg 11,000.00 h Pembantu Tukang 0.72 org 35,000.00 i Tukang batu 0.65 org 45,000.00

JumlahDibulatkan

9 1 m2 PASANG DINDING BATU TEMPEL HITAMa Batu tempel hitam 1.00 m2 72,500.00 b Semen PC ( abu-abu ) 0.24 sak 48,000.00 c Pasir pasang 0.04 m3 165,000.00 d Pembantu Tukang 0.32 org 35,000.00 e Tukang batu 0.25 org 45,000.00

JumlahDibulatkan

10 1 m2 PASANG DINDING BATU ALAMa Batu alam 1.00 m2 65,000.00 b Semen PC ( abu-abu ) 0.25 sak 48,000.00 c Pasir pasang 0.04 m3 165,000.00 d Pembantu Tukang 0.32 org 35,000.00 e Tukang batu 0.25 org 45,000.00

JumlahDibulatkan

11 1 m¹ PASANG PLINT KERAMIK UKURAN 10 x 40 cma Plint Keramik ukuran 10 x 40 cm 2.65 bh 7,500.00 b Semen PC (abu-abu) 0.02 sak 48,000.00 c Pasir pasang 0.01 m3 165,000.00 d Semen warna 0.10 kg 4,200.00 e Pembantu Tukang 0.06 org 35,000.00 f Tukang batu 0.03 org 45,000.00

Jumlah

Page 27: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANDibulatkan

12 1 m¹ PASANG PLINT KERAMIK UKURAN 10 x 30 cma Plint Keramik ukuran 10 x 30 cm 3.30 bh 6,500.00 b Semen PC (abu-abu) 0.02 sak 48,000.00 c Pasir pasang 0.01 m3 165,000.00 d Semen warna 0.12 kg 4,200.00 e Pembantu Tukang 0.06 org 35,000.00 f Tukang batu 0.03 org 45,000.00

Jumlah

Dibulatkan

IX PEKERJAAN KUSEN, PINTU, JENDELA, PARTISI1 1 m3 PASANG KUSEN PINTU & JENDELA KAYU KAMPER SAMARINDA

a Balok kayu Kamper Samarinda 1.20 m3 5,200,000.00 b Pembantu Tukang 6.00 org 35,000.00 c Tukang Kayu 15.00 org 45,000.00

JumlahDibulatkan

2 1 m3 PASANG KUSEN PINTU & JENDELA KAYU KAMPER MEDAN / KRUINGa Balok kayu Kamper Medan 1.20 m3 4,100,000.00 b Pembantu Tukang 6.00 org 35,000.00 c Tukang Kayu 15.00 org 45,000.00

JumlahDibulatkan

3 1 m3 PASANG KUSEN PINTU & JENDELA KAYU BORNEO SUPERa Kayu Balok Borneo Super 1.20 m3 3,200,000.00 b Pembantu Tukang 6.00 org 35,000.00 c Tukang Kayu 15.00 org 45,000.00

JumlahDibulatkan

4 1 m2 PASANG PINTU PANEL KAYU KAMPER SAMARINDAa Papan kayu Kamper Samarinda 0.04 m3 5,350,000.00 b Pembantu Tukang 1.00 org 35,000.00 c Tukang Kayu 2.50 org 45,000.00

JumlahDibulatkan

5 1 m2 PASANG PINTU PANEL KAYU KAMPER MEDAN / KRUINGa Papan kayu Kamper Medan 0.04 m3 4,300,000.00 b Pembantu Tukang 1.00 org 35,000.00 c Tukang Kayu 2.50 org 45,000.00

JumlahDibulatkan

6 1 m2 PASANG PINTU DAN JENDELA KACA KAYU KAMPER MEDANa Papan kayu Kamper Medan 0.04 m3 4,300,000.00 b Pembantu Tukang 0.80 org 35,000.00 c Tukang Kayu 2.00 org 45,000.00

Jumlah

Page 28: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANDibulatkan

7 1 m2 PASANG PINTU DAN JENDELA KACA KAYU BORNEOa Papan kayu Borneo Super 0.04 m3 3,300,000.00 b Pembantu Tukang 0.80 org 35,000.00 c Tukang Kayu 2.00 org 45,000.00

JumlahDibulatkan

8 1 m2 PASANG PINTU DAN JENDELA JALUSI KAYU KAMPER MEDANa Papan kayu Kamper Medan 0.06 m3 4,300,000.00 b Pembantu Tukang 1.00 org 35,000.00 c Tukang Kayu 3.00 org 45,000.00

JumlahDibulatkan

9 1 m2 PASANG PINTU TRIPLEK RANGKAP , RANGKA KAYU KAMPER MEDANa Papan kayu Kamper Medan 0.02 m3 4,300,000.00 b Paku 1 s/d 5 cm 0.03 kg 11,000.00 c Lem Kayu 0.30 Ltr 25,600.00 d Triplek 0,4 cm ukuran pintu 1.00 lbr 36,000.00 e Pembantu Tukang 0.60 org 35,000.00 f Tukang Kayu 2.00 org 45,000.00

JumlahDibulatkan

10 1 m2 PASANG JALUSI MATI KUSEN KAYU KAMPER MEDANa Papan kayu Kamper Medan 0.06 m3 4,300,000.00 b Paku 1 s/d 5 cm 0.15 kg 11,000.00 c Pembantu Tukang 0.50 org 35,000.00 d Tukang Kayu 2.00 org 45,000.00

JumlahDibulatkan

11 1 m2 PASANG PINTU TRIPLEK RANGKAP , RANGKA KAYU BORNEO SUPERa Papan kayu Borneo Super 0.02 m3 3,300,000.00 b Paku 1 s/d 5 cm 0.03 kg 11,000.00 c Lem Kayu 0.30 Ltr 25,600.00 d Triplek 0,4 cm ukuran pintu 1.00 lbr 36,000.00 e Pembantu Tukang 0.60 org 35,000.00 f Tukang Kayu 2.00 org 45,000.00

JumlahDibulatkan

12 1 m2 PASANG PINTU TEAKWOOD RANGKAP , RANGKA KAYU KAMPER MEDANa Papan kayu Kamper Medan 0.02 m3 4,300,000.00 b Paku 1 s/d 5 cm 0.30 kg 11,000.00 c Lem Kayu 0.30 Ltr 25,600.00 d Teakwood 120 x 240 x 0,4 cm 1.00 lbr 94,000.00 e Pembantu Tukang 0.60 org 35,000.00 f Tukang Kayu 2.00 org 45,000.00

JumlahDibulatkan

13 1 m2 PASANG PINTU TRIPLEK & FORMIKA RANGKA KAYU KAMPER MEDANa Papan kayu Kamper Medan 0.02 m3 4,300,000.00 b Paku 1 s/d 5 cm 0.30 kg 11,000.00 c Lem Kayu 0.80 Ltr 25,600.00 d Triplek 0,4 cm ukuran pintu 1.00 lbr 36,000.00 e Formica 3" x 6" 0.50 lbr 125,000.00 f Pembantu Tukang 0.80 org 35,000.00 g Tukang Kayu 2.50 org 45,000.00

Page 29: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANJumlahDibulatkan

14 1 m2 PASANG PINTU TEAKWOOD & FORMIKA RANGKA KAYU KAMPER MEDAN a Papan kayu Kamper Medan 0.02 m3 4,300,000.00 b Paku 1 s/d 5 cm 0.30 kg 11,000.00 c Lem Kayu 0.80 Ltr 25,600.00 d Teakwood 120 x 240 x 0,4 cm 0.50 lbr 94,000.00 e Vernis 0.50 Ltr 35,000.00 a Formica 4" x 8" 0.50 lbr 125,000.00 b Pembantu Tukang 0.80 org 35,000.00 c Tukang Kayu 2.50 org 45,000.00

JumlahDibulatkan

15 1 m2 PASANG DINDING PEMISAH DOUBLE TEAKWOOD, RANGKA KAYU KAMPER MEDANa Balok kayu Kamper Medan 0.02 m3 4,100,000.00 b Papan kayu Kamper Medan 0.01 m3 4,300,000.00 c Paku 5 - 12 cm 0.10 kg 11,000.00 d Lem Kayu 0.56 Ltr 25,600.00 e Teakwood 120 x 240 x 0,4 cm 1.00 lbr 94,000.00 f Pembantu Tukang 0.15 org 35,000.00 g Tukang Kayu 0.45 org 45,000.00

JumlahDibulatkan

16 1 m2 PASANG DINDING PEMISAH DOUBLE GRC, RANGKA KAYU KAMPER MEDANa Balok kayu Kamper Medan 0.02 m3 4,100,000.00 b Papan kayu Kamper Medan 0.01 m3 4,300,000.00 c Paku 5 - 12 cm 0.10 kg 11,000.00 d Lem Kayu 0.56 Ltr 25,600.00 e Triplek 0,4 cm ukuran pintu 1.00 lbr 36,000.00 f Pembantu Tukang 0.20 org 35,000.00 g Tukang Kayu 0.60 org 45,000.00

JumlahDibulatkan

17 1 Bh PASANG PINTU ALUMINIUM / PINTU PVCa Pintu Aluminium / Pintu PVC 1.00 bh 375,000.00 b Alat bantu 10 % harga material 1.00 ls 37,500.00 c Tukang Kayu 0.02 org 45,000.00

JumlahDibulatkan

18 1 m2 PASANG KUSEN PARTISI DOUBLE TRIPLEK a Balok kayu borneo super 0.11 m3 3,200,000.00 b Triplek 0,4 cm ukuran pintu 5.00 lbr 36,000.00 c Paku 1 s/d 3 cm 2.00 kg 11,000.00 d Ampelas 2.00 lbr 3,500.00 e Engsel 4.00 bh 22,500.00 f Grendel / Slot 4.00 bh 29,000.00 g Pembantu Tukang 0.30 org 35,000.00 h Tukang Kayu terampil 1.30 org 45,000.00

JumlahDibulatkan

19 1 m2 PASANG KUSEN PARTISI DOUBLE GYPSUM + RANGKA KAYUa Balok kayu borneo super 0.11 m3 3,200,000.00 b Gypsum board ( 120 x 240 x 9 ) mm 0.72 lbr 57,100.00

Page 30: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANc Paku 1 s/d 3 cm 2.00 kg 11,000.00 d Ampelas 2.00 lbr 3,500.00 e Engsel 4.00 bh 22,500.00 f Grendel / Slot 4.00 bh 29,000.00 g Pembantu Tukang 0.30 org 35,000.00 h Tukang Kayu 1.30 org 45,000.00

JumlahDibulatkan

20 1 m2 PASANG DINDING PARTISI GYPSUM BOARD + RANGKA BESI HOLLOWa Hollow 4/4 Zincromate 0.42 btg 45,000.00 b Hollow 2/4 Zincromate 0.15 btg 32,000.00 c Gypsum board ( 120 x 240 x 9 ) mm 0.72 lbr 57,100.00 d Paku sekrup 25.00 bh 560.00 e Ramset / dina bolt 4.00 bh 2,500.00 f Cotton plaster 0.10 bh 55,000.00 g Compoun 0.13 kg 28,000.00 h Pembantu Tukang 0.10 org 35,000.00 i Tukang kayu 0.05 org 45,000.00

Jumlah

Dibulatkan

X PEKERJAAN RANGKA ATAP DAN PENUTUP ATAPA PEKERJAAN RANGKA ATAP

1 1 m3 PEKERJAAN KONSTRUKSI KUDA - KUDA KAYU KAMPER MEDANa Balok kayu Kamper Medan 1.10 m3 4,100,000.00 b Besi Strip 15.00 kg 9,500.00 c Paku Ukuran besar 0.80 kg 11,000.00 d Meni kayu 0.40 kg 15,000.00 e Pembantu Tukang 4.00 org 35,000.00 f Tukang Kayu 12.00 org 45,000.00

JumlahDibulatkan

2 1 m3 PEKERJAAN KONSTRUKSI KUDA - KUDA KAYU BORNEO SUPERa Balok kayu Borneo super 1.10 m3 3,200,000.00 b Besi Strip 15.00 kg 9,500.00 c Paku Ukuran besar 0.80 kg 11,000.00 d Meni kayu 0.40 kg 15,000.00 e Pembantu Tukang 4.00 org 35,000.00 f Tukang Kayu 12.00 org 45,000.00

JumlahDibulatkan

3 1 m2 PASANG KASO + RENG GENTENG PLENTONG KAYU BORNEO SUPERa Balok kayu Borneo super 0.01 m3 3,200,000.00 b Paku 7 - 10 cm 0.15 kg 11,000.00 c Pembantu Tukang 0.10 org 35,000.00 d Tukang Kayu 0.10 org 45,000.00

JumlahDibulatkan

Page 31: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUAN4 1 m2 PASANG KASO + RENG GENTENG BETON KAYU BORNEO SUPER

a Balok kayu Borneo super 0.01 m3 3,200,000.00 b Paku 7 - 10 cm 0.15 kg 11,000.00 c Pembantu Tukang 0.10 org 35,000.00 d Tukang Kayu 0.10 org 45,000.00

JumlahDibulatkan

5 1 M1 PASANG LISPLANG KAYU KAMPER MEDAN UKURAN 3 X 20 cm a Papan kayu Kamper Medan 0.01 m3 4,300,000.00 b Paku 7 - 10 cm 0.05 kg 11,000.00 c Pembantu Tukang 0.10 org 35,000.00 d Tukang Kayu 0.20 org 45,000.00

JumlahDibulatkan

6 1 m2 PASANG LISPLANG KAYU KAMPER MEDAN UKURAN 3 X 30 cm a Papan kayu Kamper Medan 0.01 m3 4,300,000.00 b Paku 7 - 10 cm 0.05 kg 11,000.00 c Pembantu Tukang 0.11 org 35,000.00 d Tukang Kayu 0.22 org 45,000.00

JumlahDibulatkan

7 1 m3 PEKERJAAN NOK/GORDING/JURAY KAYU BORNEO SUPER a Balok kayu Borneo super 1.05 m3 3,200,000.00 b Paku 10 - 15 cm 0.20 kg 11,000.00 c Pembantu Tukang 2.00 org 35,000.00 d Tukang Kayu 2.00 org 45,000.00

JumlahDibulatkan

B PEKERJAAN PENUTUP ATAP1 1 m2 PASANG ATAP GENTENG PLENTONG

a Genteng palentong 25.00 bh 1,100.00 b Pembantu Tukang 0.15 org 35,000.00 c Tukang kayu 0.08 org 45,000.00

JumlahDibulatkan

2 1 m2 PASANG NOK/BUBUNGAN GENTENG KERAMIK GLAZURa Genteng nok/bubungan plentong 5.00 bh 16,500.00 b Semen PC (abu-abu) 0.16 sak 48,000.00 c Pasir pasang 0.03 m3 165,000.00 d Pembantu Tukang 0.30 org 35,000.00 e Tukang kayu 0.20 org 45,000.00

JumlahDibulatkan

3 1 m2 PASANG ATAP FIBREGLASS UKURAN 180 X 90 cma Atap fibreglass 0.60 lbr 62,000.00 b Paku 2 - 5 cm 0.05 kg 11,000.00 c Pembantu Tukang 0.14 org 35,000.00 d Tukang kayu 0.07 org 45,000.00

JumlahDibulatkan

4 1 m2 PASANG ATAP ASBES GELOMBANG UKURAN 2,70 x 1,05 m TEBAL 4 mm

Page 32: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANa Asbes gelombang 0.35 lbr 68,500.00 b Paku Payung 0.12 kg 11,000.00 c Pembantu Tukang 0.14 org 35,000.00 d Tukang kayu 0.07 org 45,000.00

JumlahDibulatkan

5 1 m2 PASANG ATAP ASBES GELOMBANG UKURAN 2,40 x 1,05 m TEBAL 4 mma Asbes gelombang 0.42 lbr 60,000.00 b Paku Payung 0.12 kg 11,000.00 c Pembantu Tukang 0.14 org 35,000.00 d Tukang kayu 0.07 org 45,000.00

JumlahDibulatkan

6 1 m2 PASANG ATAP ASBES GELOMBANG UKURAN 2,70 x 1,02 m TEBAL 5 mma Asbes gelombang 0.44 lbr 87,500.00 b Paku Payung 0.12 kg 11,000.00 c Pembantu Tukang 0.14 org 35,000.00 d Tukang kayu 0.07 org 45,000.00

JumlahDibulatkan

7 1 m2 PASANG ATAP ASBES GELOMBANG UKURAN 2,40 x 1,02 m TEBAL 5 mma Asbes gelombang 0.51 lbr 78,200.00 b Paku Payung 0.12 kg 11,000.00 c Pembantu Tukang 0.14 org 35,000.00 d Tukang kayu 0.07 org 45,000.00

JumlahDibulatkan

8 1 m2 PASANG ATAP ASBES GELOMBANG ( 1,50 x 1,02 m ) x 5 mma Asbes gelombang 0.80 lbr 46,000.00 b Paku Payung 0.12 kg 11,000.00 c Pembantu Tukang 0.14 org 35,000.00 d Tukang kayu 0.07 org 45,000.00

JumlahDibulatkan

9 1 m¹ PASANG ATAP SIRAPa Genteng Sirap 80.00 bh 900.00 b Paku 0.20 kg 11,000.00 c Pembantu Tukang 0.10 org 35,000.00 d Tukang kayu 0.20 org 45,000.00

JumlahDibulatkan

10 1 m2 PASANG ATAP GENTENG BETONa Genteng beton 1.10 bh 72,000.00 b Paku 5 - 12 cm 0.03 kg 11,000.00 c Pembantu Tukang 0.20 org 35,000.00 d Tukang kayu 0.10 org 45,000.00

JumlahDibulatkan

11 1 m2 PASANG ATAP GENTENG METAL + C301a Genteng metal 1.02 lbr 132,000.00 b Paku 5 - 12 cm 0.20 kg 11,000.00

Page 33: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANc Pembantu Tukang 0.20 org 35,000.00 d Tukang kayu 0.10 org 45,000.00

JumlahDibulatkan

12 1 m¹ PASANG NOK GENTENG BETONa Nok genteng beton 3.50 bh 15,500.00 b Paku 5 - 12 cm 0.05 kg 11,000.00 c Semen PC (abu-abu) 0.22 sak 48,000.00 d Pasir pasang 0.03 m3 165,000.00 e Semen warna 1.00 kg 4,200.00 f Pembantu Tukang 0.40 org 35,000.00 g Tukang kayu 0.20 org 45,000.00

JumlahDibulatkan

13 1 m¹ PASANG NOK GENTENG METALa Nok genteng metal 1.10 bh 53,000.00 b Paku Payung 0.05 kg 11,000.00 c Pembantu Tukang 0.25 org 35,000.00 d Tukang kayu 0.15 org 45,000.00

JumlahDibulatkan

14 1 m2 PASANG ATAP SENG GELOMBANGa Seng gelombang 0.70 lbr 43,000.00 b Paku Payung 0.02 kg 11,000.00 c Pembantu Tukang 0.12 org 35,000.00 d Tukang kayu 0.06 org 45,000.00

JumlahDibulatkan

15 1 m2 PASANG NOK SENG UNTUK ATAP SENG GELOMBANGa Seng plat BJLS 1.05 M1 31,000.00 b Paku Payung 0.04 kg 11,000.00 c Pembantu Tukang 0.15 org 35,000.00 d Tukang kayu 0.07 org 45,000.00

JumlahDibulatkan

16 1 m2 PASANG ATAP POLYCARBONATEa Polycarbonate 1.05 m2 198,000.00 b Besi Hollow 1.50 btg 45,000.00 c Alat bantu 20 % harga material 1.00 ls 41,580.00 d Pembantu Tukang 0.15 org 35,000.00 e Tukang kayu 0.05 org 45,000.00

Jumlah

Dibulatkan

17 1 m2 PASANG ALUMINIUM FOIL a Aluminium foil 1.05 m2 4,200.00 b Alat bantu 20 % harga material 1.00 ls 882.00 c Pembantu Tukang 0.15 org 35,000.00 d Tukang kayu 0.05 org 45,000.00

Jumlah

Dibulatkan

Page 34: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUAN

XI PEKERJAAN PENUTUP PLAFOND1 1 m2 Pasang rangka plafond ( ukrn 0,50 x 1,00 ) m, Kayu Borneo Super

a Balok kayu Borneo Super 4 x 6 cm 0.01 m3 3,200,000.00 b Paku 5 - 12 cm 0.10 kg 11,000.00 c Pembantu Tukang 0.15 org 35,000.00 d Tukang Kayu 0.25 org 45,000.00

JumlahDibulatkan

2 1 m2 Plafond GRC ( 60 x 1,20 ) m, tebal 4 mma Pelat GRC tebal 4 mm 1.10 lbr 45,600.00 b Paku 1 cm 0.01 kg 11,000.00 c Pembantu Tukang 0.03 org 35,000.00 d Tukang kayu 0.07 org 45,000.00

JumlahDibulatkan

3 1 m2 Plafond Asbes ( 1,00 x 1,00 ) m, tebal 5 mma Pelat asbes tebal 5 mm 1.10 lbr 14,000.00 b Paku 1 cm 0.01 kg 11,000.00 c Pembantu Tukang 0.03 org 35,000.00 d Tukang kayu 0.07 org 45,000.00

JumlahDibulatkan

4 1 m2 Plafond Akustik ( 60 x 120 ) cma Akustik 600 x 1200 x 15 mm 1.50 lbr 72,000.00 b Paku 2 - 5 cm 0.05 kg 11,000.00 c Pembantu Tukang 0.06 org 35,000.00 d Tukang kayu 0.10 org 45,000.00

JumlahDibulatkan

5 1 m2 Plafond Akustik ( 60 x 120 ) cm + Rangka Alluminiuma Profil Alluminium "T" 3.60 M¹ 30,000.00 b Kawat seng polos 0.15 kg 11,200.00 c Ramset / dina bolt 1.00 bh 2,500.00 d Akustik 600 x 1200 x 15 mm 1.50 lbr 72,000.00 e Pembantu Tukang 0.15 org 35,000.00 f Tukang kayu 0.20 org 45,000.00

JumlahDibulatkan

6 1 M¹ List Plafond Profil kayua List Profil kayu 1.10 M¹ 13,500.00 b Paku 2 cm 0.01 kg 11,000.00 c Pembantu Tukang 0.05 org 35,000.00

Page 35: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANd Tukang kayu 0.05 org 45,000.00

JumlahDibulatkan

7 1 M¹ List Plafond kayu 1/4a List kayu 1/4 1.10 M¹ 4,300.00 b Paku 2 cm 0.01 kg 11,000.00 c Pembantu Tukang 0.05 org 35,000.00 d Tukang kayu 0.05 org 45,000.00

JumlahDibulatkan

8 1 m2 Plafond Triplek 4 mm + Rangka Kayu Borneo Supera Balok kayu Borneo Super 0.02 m3 3,200,000.00 b Paku 1- 12 cm 0.06 kg 11,000.00 c Triplek 120 cm x 240 cm x 0,4 cm 0.39 lbr 36,000.00 d Pembantu Tukang 0.27 org 35,000.00 e Tukang kayu 0.40 org 45,000.00

JumlahDibulatkan

9 1 m2 Plafond Teakwood 4 mm + Rangka Kayu Borneo Supera Balok kayu Borneo Super 0.02 m3 3,200,000.00 b Paku 1 - 12 cm 0.06 kg 11,000.00 c Teakwood 120 cm x 240 cm x 0,4 cm 0.39 lbr 94,000.00 d Pembantu Tukang 0.27 org 35,000.00 e Tukang kayu 0.40 org 45,000.00

JumlahDibulatkan

10 1 m2 Plafond Papan 10 cm, tebal 1 cm + Rangka Kayu Borneo Supera Balok kayu Borneo Super 0.02 m3 3,200,000.00 b Paku 2 - 12 cm 0.20 kg 11,000.00 c Papan kayu kamper 0.02 m3 5,350,000.00 d Pembantu Tukang 0.35 org 35,000.00 e Tukang kayu 0.50 org 45,000.00

JumlahDibulatkan

11 1 m2 plafond Gypsum Board, tebal 9 mm + rangka besi hollowa Hollow 4/4 Zincromate 0.42 btg 45,000.00 b Hollow 2/4 Zincromate 0.15 btg 32,000.00 c Gypsum board ( 120 x 240 x 9 ) mm 0.36 lbr 57,100.00 d Paku sekrup 25.00 bh 560.00 e Ramset / dina bolt 4.00 bh 2,500.00 f Cotton plaster 0.07 bh 55,000.00 g Compoun 0.13 kg 28,000.00 h Pembantu Tukang 0.10 org 35,000.00 i Tukang kayu 0.05 org 45,000.00

Jumlah

Dibulatkan

XII PEKERJAAN SANITAIR 1 Memasang 1 buah kloset duduk / monoblok

a Kloset duduk / monoblok 1.00 bh 2,265,000.00 b Perlengkapan ( 10% hrg kloset ) 226,500.00

Page 36: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANc Pembantu Tukang 3.30 org 35,000.00 d Tukang batu 1.10 org 45,000.00

JumlahDibulatkan

2 Memasang 1 buah kloset jongkok porselena Kloset jongkok porselen 1.00 bh 146,000.00 b Semen PC (abu-abu) 0.12 sak 48,000.00 c Pasir pasang 0.01 m3 165,000.00 d Pembantu Tukang 1.00 org 35,000.00 e Tukang batu 1.50 org 45,000.00

JumlahDibulatkan

3 Memasang 1 buah urinoira Urinoir 1.00 bh 377,000.00 b Perlengkapan ( 30% hrg urinoir ) 113,100.00 c Semen PC (abu-abu) 0.12 sak 48,000.00 d Pasir pasang 0.01 m3 165,000.00 e Pembantu Tukang 1.00 org 35,000.00 f Tukang batu 1.00 org 45,000.00

JumlahDibulatkan

4 Memasang 1 buah wastafel dindinga Wastafel 1.00 bh 202,000.00 b Perlengkapan ( 12% hrg kloset ) 24,240.00 c Semen PC ( abu-abu ) 0.12 sak 48,000.00 d Pasir pasang 0.01 m3 165,000.00 e Pembantu Tukang 1.20 org 35,000.00 f Tukang batu 1.45 org 45,000.00

JumlahDibulatkan

5 Memasang 1 buah wastafel kakia Wastafel 1.00 bh 245,000.00 b Perlengkapan ( 12% hrg kloset ) 29,400.00 c Semen PC ( abu-abu ) 0.12 sak 48,000.00 d Pasir pasang 0.01 m3 165,000.00 e Pembantu Tukang 1.20 org 35,000.00 f Tukang batu 1.45 org 45,000.00

JumlahDibulatkan

6 Memasang 1 bh shower dindinga Shower dinding 1.00 bh 125,000.00 b Pembantu Tukang 0.01 org 35,000.00 c Tukang batu 0.10 org 45,000.00

JumlahDibulatkan

7 Memasang bak mandi Fiberglass ukuran sedanga Bak fibreglass 1.00 bh 150,000.00 b Perlengkapan ( 20% hrg bak ) 27,000.00 c Pembantu tukang 1.80 org 35,000.00 d Tukang batu 2.70 org 45,000.00

JumlahDibulatkan

8 Memasang bak kontrol pasangan batu bata ukuran 30 x 30 cm, tinggi 35 cma Batu bata 0.15 m3 550.00 b Semen PC (abu-abu) 0.88 sak 48,000.00 c Pasir pasang 0.07 m3 165,000.00

Page 37: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANd Batu kerikil 0.07 m3 65,000.00 e Besi beton 1.60 kg 8,900.00 f Pasir Beton 0.06 m3 180,000.00 g Pembantu Tukang 3.20 org 35,000.00 h Tukang batu 1.02 org 45,000.00

JumlahDibulatkan

9 Memasang Kichen Zink/bak cuci piring stainless steela Bak cuci stainless steel 1.00 bh 173,000.00 b Water Drain + Asesories 1.00 Set 69,500.00 c Pembantu Tukang 0.03 org 35,000.00 d Tukang batu 0.30 org 45,000.00

JumlahDibulatkan

10 Memasang 1 bh kran diameter 3/4 " atau 1/2 "a Kran air 1.00 bh 54,900.00 b Perlengkapan ( 2% hrg kran ) 1.00 ls 1,098.00 c Pembantu Tukang 0.01 org 35,000.00 d Tukang batu 0.10 org 45,000.00

JumlahDibulatkan

11 Memasang 1 bh kran air angsaa Kran air angsa 1.00 bh 155,000.00 b Perlengkapan ( 2% hrg kran ) 1.00 ls 3,100.00 c Pembantu Tukang 0.01 org 35,000.00 d Tukang batu 0.10 org 45,000.00

JumlahDibulatkan

12 Memasang 1 bh Floor draina Floor drain 1.00 bh 59,000.00 b Pembantu Tukang 0.01 org 35,000.00 c Tukang batu 0.10 org 45,000.00

JumlahDibulatkan

13 Memasang 1 bh tempat sabuna Tempat Sabun 1.00 bh 30,000.00 b Pembantu Tukang 0.01 org 35,000.00 c Tukang batu 0.10 org 45,000.00

Jumlah

Dibulatkan

XIII PEKERJAAN PERPIPAAN DAN POMPA1 Memasang 1 M¹ pipa galvanis diameter ½"

a Pipa galvanis dia 1/2" 1.10 M¹ 10,500.00 b Perlengkapan ( 30% harga pipa ) 3,150.00 c Pembantu Tukang 0.05 org 35,000.00 d Tukang pipa 0.09 org 45,000.00

JumlahDibulatkan

2 Memasang 1 M¹ pipa galvanis diameter ¾"

Page 38: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANa Pipa galvanis 1.10 M¹ 17,500.00 b Perlengkapan ( 30% harga pipa ) 5,250.00 c Pembantu Tukang 0.05 org 35,000.00 d Tukang pipa 0.09 org 45,000.00

JumlahDibulatkan

3 Memasang 1 M¹ pipa galvanis diameter 1"a Pipa galvanis 1.10 M¹ 25,000.00 b Perlengkapan ( 30% harga pipa ) 7,500.00 c Pembantu Tukang 0.05 org 35,000.00 d Tukang pipa 0.09 org 45,000.00

JumlahDibulatkan

4 Memasang 1 M¹ pipa galvanis diameter 1½"a Pipa galvanis 1.10 M¹ 30,000.00 b Perlengkapan ( 30% harga pipa ) 9,000.00 c Pembantu Tukang 0.11 org 35,000.00 d Tukang pipa 0.18 org 45,000.00

JumlahDibulatkan

5 Memasang 1 M¹ pipa PVC type D diameter 3"a Pipa PVC type D 1.10 M¹ 6,500.00 b Perlengkapan ( 30% harga pipa ) 1,950.00 c Pembantu Tukang 0.10 org 35,000.00 d Tukang pipa 0.18 org 45,000.00

JumlahDibulatkan

6 Memasang 1 M¹ pipa PVC type D diameter 4"a Pipa PVC type D 1.10 M¹ 8,500.00 b Perlengkapan ( 30% harga pipa ) 2,550.00 c Pembantu Tukang 0.13 org 35,000.00 d Tukang pipa 0.22 org 45,000.00

JumlahDibulatkan

7 Memasang 1 M¹ PVC tipe AW diameter ½"a Pipa PVC 1.10 M¹ 4,200.00 b Perlengkapan ( 30% harga pipa ) 1,260.00 c Pembantu Tukang 0.04 org 35,000.00 d Tukang pipa 0.06 org 45,000.00

JumlahDibulatkan

8 Memasang 1 M¹ PVC tipe AW diameter ¾"a Pipa PVC 1.10 M¹ 5,000.00 b Perlengkapan ( 30% harga pipa ) 1,500.00 c Pembantu Tukang 0.03 org 35,000.00 d Tukang pipa 0.06 org 45,000.00

JumlahDibulatkan

9 Memasang 1 M¹ PVC tipe AW diameter 1"a Pipa PVC 1.10 M¹ 6,500.00 b Perlengkapan ( 30% harga pipa ) 1,950.00

Page 39: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANc Pembantu Tukang 0.04 org 35,000.00 d Tukang pipa 0.06 org 45,000.00

JumlahDibulatkan

10 Memasang 1 M¹ PVC tipe AW diameter 2"a Pipa PVC 1.10 M¹ 8,500.00 b Perlengkapan ( 30% harga pipa ) 2,550.00 c Pembantu Tukang 0.05 org 35,000.00 d Tukang pipa 0.09 org 45,000.00

JumlahDibulatkan

11 Memasang 1 M¹ PVC tipe AW diameter 4"a Pipa PVC 1.10 M¹ 17,000.00 b Perlengkapan ( 30% harga pipa ) 5,100.00 c Pembantu Tukang 0.08 org 35,000.00 d Tukang pipa 0.14 org 45,000.00

JumlahDibulatkan

12 Membuat 1 bh Septictank pasangan Batu Bata dan RembesanGalian tanah Septictank & rembesan 7.5 M3 26,620.00 Pasir urug 0.21 M3 145,000.00 Lantai kerja 2.25 M3 543,400.00 Pasang bata 1 Pc : 2 Psr 15.00 M2 74,720.00 Pelat beton penutup dan balok 0.30 M3 4,200,400.00 Pipa PVC 4 inci AW & perlengkapannya 5.40 M1 17,000.00 Plesteran 1 Pc : 3 Psr 30.00 M2 23,200.00 Pasangan ijuk 5.00 IKAT 15,000.00 Urugan kerikil 3,5 cm 1.05 M3 207,400.00 Pipa PVC 4 inci AW dilobang 9.00 M1 17,000.00 Urugan kembali 1.13 M3 7,300.00 Pembantu Tukang 4.00 org 35,000.00 Tukang batu 3.00 org 45,000.00 JumlahDibulatkan

13 Memasang 1 bh Pompa Aira Pompa Air 100 Watt 1.00 bh 750,000.00 b Perlengkapan ( 25% harga pompa ) 187,500.00 c Pembantu Tukang 0.08 org 35,000.00 d Tukang Pipa 0.14 org 45,000.00

Jumlah

Dibulatkan

XIV PEKERJAAN PENUTUP BESI DAN BAJA 1 1 kg Pasang Rangka Atap Baja

a Besi profil WF 1.10 kg 9,800.00 b Meni besi 0.08 kg 16,000.00 c Peralatan las ( 5 % material ) 1.00 ls 539.00 d Elektroda 0.20 ls 11,000.00

Page 40: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANe Tukang besi 0.04 org 45,000.00 f Pembantu Tukang 0.06 org 35,000.00

JumlahDibulatkan

2 1 kg Pasang Rangka Atap besi sikua Besi Siku 1.10 kg 9,800.00 b Meni besi 0.10 kg 16,000.00 c Peralatan las ( 5 % material ) 1.00 ls 539.00 d Elektroda 0.15 ls 11,000.00 e Baud 0.20 kg 8,900.00 f Tukang besi 0.04 org 45,000.00 g Pembantu Tukang 0.06 org 35,000.00

JumlahDibulatkan

3 1 kg Pasang Gording besi Ca Besi C 1.10 kg 9,500.00 b Meni besi 0.10 kg 16,000.00 c Peralatan las ( 5 % material ) 1.00 ls 522.50 d Elektroda 0.15 ls 11,000.00 e Baud 0.20 kg 8,900.00 f Tukang besi 0.04 org 45,000.00 g Pembantu Tukang 0.06 org 35,000.00

JumlahDibulatkan

4 1 m2 Pasang Pintu Rolling Door besia Rolling door besi 1.00 m2 165,000.00 b Tukang besi 1.50 org 45,000.00 c Pembantu Tukang 1.05 org 35,000.00

JumlahDibulatkan

5 1 bh Pasang Pintu besi ukuran 0,8 x 2 ma Pintu besi jadi 1.00 bh 375,000.00 b Tukang besi 1.05 org 45,000.00 c Pembantu Tukang 1.05 org 35,000.00

JumlahDibulatkan

6 1 m2 Pasang Teralis Besia Besi strip 2 mm x 3 cm 11.50 M¹ 9,500.00 b Tukang las 1.20 org 45,000.00 c Pembantu Tukang 1.20 org 35,000.00

JumlahDibulatkan

7 1 m2 Pasang Kawat Harmonikaa Kawat harmonika 1.10 m2 11,000.00 b Paku 2 - 5 cm 0.02 kg 11,000.00 c Papan kayu kamper medan 0.00 m3 4,300,000.00 d Pembantu Tukang 0.10 org 35,000.00 e Tukang kayu 0.10 org 45,000.00

JumlahDibulatkan

8 1 M1 Pasang Talang Datar, Seng plat BJLSa Seng plat BJLS 1.00 M1 31,000.00 b Paku 2 - 5 cm 0.02 kg 11,000.00

Page 41: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANc Papan kayu borneo super 0.01 m3 3,300,000.00 d Flincote / meni besi 0.25 kg 14,500.00 e Pembantu Tukang 0.15 org 35,000.00 f Tukang kayu 0.40 org 45,000.00

JumlahDibulatkan

9 1 M1 Pasang Talang Miring, Seng plat BJLS a Seng plat BJLS 0.50 M1 31,000.00 b Paku 2 - 5 cm 0.02 kg 11,000.00 c Papan kayu borneo super 0.02 m3 3,300,000.00 d Flincote / meni besi 0.30 kg 14,500.00 e Pembantu Tukang 0.04 org 35,000.00 f Tukang kayu 0.40 org 45,000.00

JumlahDibulatkan

XV PEKERJAAN ALUMINIUM1 1 m2 Pasang Pintu Rolling Door aluminium

a Rolling door aluminium 1.00 m2 165,000.00 b Tukang besi konstruksi 1.50 org 45,000.00 c Pembantu Tukang 1.05 org 35,000.00

JumlahDibulatkan

2 1 m2 Pasang Pintu Aluminium pabrikana Pintu alluminium 1.00 bh 375,000.00 b Tukang batu 1.05 org 45,000.00 c Pembantu Tukang 1.05 org 35,000.00

JumlahDibulatkan

3 1 Unit Kusen Jendela Aluminium 2 lubang dgn 2 daun jendela ( ukuran 1,6 x 1,5 m )a Profil aluminium 4" natural (+ spare 20 %) 9.24 M1 82,000.00 b Profil daun jendela alm.( + spare 20%) 11.04 M1 79,000.00 c Kaca polos 3 mm 2.40 m2 48,000.00 d Engsel jendela 4.00 ps 21,000.00 e Grendel jendela 2.00 bh 19,000.00 f Kait angin 2.00 bh 10,900.00 g Acesories ( 6 % harga bahan) 1.00 ls 104,702.40 h Upah pembuatan profil ( 20 % bahan ) 1.00 ls 151,536.00 i Upah pembuatan daun jendela (20 % bahan) 1.00 ls 174,432.00

JumlahDibulatkan

4 1 Unit Kusen Jendela Aluminium 3 lubang dgn 2 daun jendela dan 1 kaca mati (ukuran 2 x 1,5 m)a Profil aluminium 4" natural (+ spare 20 %) 12.00 M1 82,000.00 b Profil daun jendela alm.( + spare 20%) 11.04 M1 79,000.00 c Kaca polos 3 mm 3.00 m2 48,000.00 d Engsel jendela 4.00 ps 21,000.00 e Grendel jendela 2.00 bh 19,000.00

Page 42: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANf Kait angin 2.00 bh 10,900.00 g Acesories ( 6 % harga bahan ) 1.00 ls 120,009.60 h Upah pembuatan profil ( 20 % bahan ) 1.00 ls 196,800.00 i Upah pembuatan daun jendela (20 % bahan) 1.00 ls 174,432.00

JumlahDibulatkan

5 1 Unit Kusen Pintu Jendela gendong Aluminium dgn 2 jndl dan 1 pnt teakwood (ukr 2,2 x 2,7 m)a Profil aluminium 4" natural (+ spare 20 %) 17.04 M1 82,000.00 b Profil daun jendela alm.( + spare 20%) 14.88 M1 79,000.00 c Kaca polos 3 mm 3.96 m2 48,000.00 d Daun pintu teakwood 1.80 m2 300,200.00 e Engsel jendela 4.00 ps 21,000.00 f Grendel jendela 2.00 bh 19,000.00 g Kait angin 4.00 bh 10,900.00 h Engsel pintu 3.00 ps 22,500.00 i Grendel pintu 1.00 bh 29,000.00 j Kunci tanam 1.00 bh 15,000.00 k Acesories ( 6 % harga bahan ) 1.00 ls 138,144.00 l Upah pembuatan profil ( 20 % bahan ) 1.00 ls 16,800.00

m Upah pembuatan daun jendela (20 % bahan) 1.00 ls 7,600.00 JumlahDibulatkan

6 1 Unit Kusen Pintu Aluminium ukr 0.9 x 2,7 ma Profil aluminium 4" natural (+ spare 20 %) 7.56 M1 82,000.00 b Kaca polos 3 mm untuk bovenlight 0.45 m2 48,000.00 c Daun pintu tekwood 1.68 m2 300,200.00 d Engsel pintu 3.00 ps 22,500.00 e Grendel pintu 1.00 bh 29,000.00 f Kunci tanam 1.00 bh 15,000.00 g Acesories ( 6 % ) 1.00 ls 38,491.20 h Upah pembuatan profil ( 20 % bahan ) 1.00 ls 123,984.00

JumlahDibulatkan

7 1 bh Bovenlight Almunium dengan kisi-kisi almunium plat (ukuran 0,5 x 1 m)a Profil Aluminium 4" natural + upah 20% 3.60 M1 48,000.00 b Plat Aluminium untuk Jalusi 5.00 M1 16,000.00 c Acesories ( 6 % ) 1.00 ls 10,368.00 d Upah pembuatan profil ( 20 % bahan ) 1.00 ls 24,796.80

JumlahDibulatkan

8 1 bh Bovenlight Almunium ukuran 0,5 x 1 m dengan bagian dalam kacaa Profil Aluminium 4" natural + upah 20% 3.60 M1 82,000.00 b Kaca Polos 3 mm 0.50 m2 48,000.00 c Acesories ( 6 % ) 1.00 ls 17,712.00 d Upah pembuatan profil ( 20 % bahan ) 1.00 ls 4,959.36

JumlahDibulatkan

Page 43: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUAN

XVI PEKERJAAN KACA & PENGGANTUNG1 1 Buah Pasang Kunci Tanam besar

a Kunci tanam besar 1.00 bh 210,000.00 b Pembantu Tukang 0.06 org 35,000.00 c Tukang kayu 0.60 org 45,000.00

JumlahDibulatkan

2 1 Buah Pasang Kunci Tanam sedanga Kunci tanam sedang 1.00 bh 45,000.00 b Pembantu Tukang 0.01 org 35,000.00 c Tukang kayu 0.50 org 45,000.00

JumlahDibulatkan

3 1 Buah Pasang Kunci bulat putar Kamar Mandia Kunci bulat putar kamar mandi 1.00 bh 49,000.00 b Pembantu Tukang 0.01 org 35,000.00 c Tukang kayu 0.50 org 45,000.00

JumlahDibulatkan

4 1 Buah Pasang Engsel Pintua Engsel pintu 1.00 bh 22,500.00 b Pembantu Tukang 0.02 org 35,000.00 c Tukang kayu 0.15 org 45,000.00

JumlahDibulatkan

5 1 Buah Pasang Engsel Jendela Kupu-kupua Engsel jendela 1.00 bh 21,000.00 b Pembantu Tukang 0.01 org 35,000.00 c Tukang kayu 0.10 org 45,000.00

JumlahDibulatkan

6 1 Buah Pasang Kait Angina Kait angin 1.00 bh 10,900.00 b Pembantu Tukang 0.02 org 35,000.00 c Tukang kayu 0.15 org 45,000.00

JumlahDibulatkan

7 1 Buah Pasang Door Closera Door closer 1.00 bh 348,000.00 b Pembantu Tukang 0.05 org 35,000.00 c Tukang kayu 0.50 org 45,000.00

JumlahDibulatkan

8 1 Buah Pasang Pegangan Pintu / Door Holdera Door holder 1.00 bh 45,000.00 b Pembantu Tukang 0.05 org 35,000.00 c Tukang kayu 0.50 org 45,000.00

JumlahDibulatkan

9 1 Buah Pasang Penahan Pintu / Door stoper

Page 44: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANa Door stoper 1.00 bh 55,000.00 b Pembantu Tukang 0.05 org 35,000.00 c Tukang kayu 0.50 org 45,000.00

JumlahDibulatkan

10 1 Buah Pasang Grendel / Sloot pintua Grendel / sloot pintu 1.00 bh 29,000.00 b Pembantu Tukang 0.05 org 35,000.00 c Tukang kayu 0.50 org 45,000.00

JumlahDibulatkan

11 1 Buah Pasang Grendel / Sloot jendelaa Grendel / sloot jendela 1.00 bh 19,000.00 b Pembantu Tukang 0.05 org 35,000.00 c Tukang kayu 0.50 org 45,000.00

JumlahDibulatkan

12 1 Buah Pasang tarikan jendelaa Tarikan jendela 1.00 bh 15,600.00 b Pembantu Tukang 0.05 org 35,000.00 c Tukang kayu 0.50 org 45,000.00

JumlahDibulatkan

13 1 m2 Pasang Kaca polos, tebal 3 mma Kaca polos 1.10 m2 48,000.00 b Pembantu Tukang 0.02 org 35,000.00 c Tukang kayu 0.15 org 45,000.00

JumlahDibulatkan

14 1 m2 Pasang Kaca polos, tebal 5 mma Kaca polos 1.10 m2 66,000.00 b Pembantu Tukang 0.02 org 35,000.00 c Tukang kayu 0.15 org 45,000.00

Jumlah

Dibulatkan

15 1 m2 Pasang Kaca Ray band, tebal 5 mma Kaca 1.10 m2 125,000.00 b Pembantu Tukang 0.02 org 35,000.00 c Tukang kayu 0.15 org 45,000.00

Jumlah

Dibulatkan

XVII PEKERJAAN PENGECATAN

1 1 m2 Mengikis / Mengerok / mengelupas Permukaan Cat Tembok Lamaa Soda api 0.05 kg 41,000.00

Page 45: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANb Pembantu Tukang 0.05 org 35,000.00 c Tukang cat 0.02 org 40,000.00

JumlahDibulatkan

2 1 m2 Mendempul Dan Menggosok Kayua Dempul jadi 0.10 kg 23,100.00 b Minyak cat 0.03 kg 16,500.00 c Ampelas kasar 0.30 lbr 3,500.00 d Pembantu Tukang 0.04 org 35,000.00 e Tukang cat 0.05 org 40,000.00

JumlahDibulatkan

3 1 m2 Pengecatan Kayu Lama a Cat meni 0.25 kg 16,000.00 b Plamir 0.15 kg 17,000.00 c Ampelas 1.00 lbr 3,500.00 d Cat dasar 0.15 kg 39,000.00 e Cat penutup kwalitas baik 0.60 kg 36,000.00 f Pembantu Tukang 0.05 org 35,000.00

g Tukang cat 0.15 org 40,000.00 JumlahDibulatkan

4 1 m2 Pengecatan Kayu Barua Cat meni 0.50 kg 16,000.00 b Plamir 0.15 kg 17,000.00 c Ampelas 1.00 lbr 3,500.00 d Cat dasar 0.15 kg 39,000.00 e Cat penutup kwalitas baik 0.35 kg 36,000.00 f Pembantu Tukang 0.05 org 35,000.00 g Tukang cat 0.15 org 40,000.00

JumlahDibulatkan

5 1 m2 Pengecatan Kayu dengan Politura Politur 0.15 Ltr 33,000.00 b Dempul jadi 0.25 kg 23,100.00 c Ampelas 2.00 lbr 3,500.00 d Pembantu Tukang 0.05 org 35,000.00 e Tukang cat 0.15 org 40,000.00

JumlahDibulatkan

6 1 m2 Pengecatan Kayu dengan Melamika Melamik 0.15 Ltr 29,500.00 b Dempul jadi 0.25 kg 23,100.00 c Ampelas 2.00 lbr 3,500.00 d Pembantu Tukang 0.05 org 35,000.00 e Tukang cat 0.15 org 40,000.00

JumlahDibulatkan

7 1 m2 Pengecatan Kayu dengan Cat Residu/Tera Residu atau ter 0.35 Ltr 3,100.00 b Pembantu Tukang 0.15 org 35,000.00

Page 46: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANc Tukang cat 0.02 org 40,000.00

JumlahDibulatkan

8 1 m2 Pengecatan Tembok/plafond Baru kwalitas sedanga Plamir 0.10 kg 19,000.00 b Rol cat 0.01 bh 26,500.00 c Cat penutup kwalitas sedang 0.45 kg 15,000.00 d Steger ( perancah kerja ) 0.01 Ls 55,000.00 e Ampelas 0.50 lbr 3,500.00 f Pembantu Tukang 0.06 org 35,000.00 g Tukang cat 0.20 org 40,000.00

JumlahDibulatkan

9 1 m2 Pengecatan Tembok/plafond Baru kwalitas baika Plamir 0.10 kg 19,000.00 b Rol cat 0.01 bh 26,500.00 c Cat penutup kwalitas baik 0.50 kg 44,000.00 d Steger ( perancah kerja ) 0.01 Ls 55,000.00 e Ampelas 0.50 lbr 3,500.00 f Pembantu Tukang 0.06 org 35,000.00 g Tukang cat 0.20 org 40,000.00

JumlahDibulatkan

10 1 m2 Pengecatan Tembok Lama a Cat penutup kwalitas baik 0.40 kg 27,500.00 b Rol cat 0.01 bh 26,500.00 c Steger ( perancah kerja ) 0.01 Ls 55,000.00 d Ampelas 0.50 lbr 3,500.00 e Pembantu Tukang 0.06 org 35,000.00 f Tukang cat 0.20 org 40,000.00

JumlahDibulatkan

11 1 m2 Pengecatan exteriora Cat tembok 0.36 kg 71,000.00 b Plamir tembok 0.16 kg 19,000.00 c Rol cat 0.01 bh 26,500.00 d Steger ( perancah kerja ) 0.01 Ls 55,000.00 e Ampelas 0.50 lbr 3,500.00 f Pembantu Tukang 0.20 org 35,000.00 g Tukang cat 0.30 org 40,000.00

JumlahDibulatkan

12 1 m2 Memasang Wallpapera Wallpaper 1.20 m2 15,600.00 b Lem Perekat 0.20 kg 30,800.00 c Pembantu Tukang 0.02 org 35,000.00 d Tukang cat 0.15 org 40,000.00

JumlahDibulatkan

13 1 m2 Pengecatan Permukaan Baja dengan Meni Besia Meni besi 0.10 kg 16,000.00

Page 47: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUANb Kuas 0.01 bh 13,550.00 c Pembantu Tukang 0.02 org 35,000.00 d Tukang cat 0.20 org 40,000.00

JumlahDibulatkan

14 1 m2 Pengecatan Permukaan Baja dengan Meni Besi dan Cata Meni besi 0.10 kg 16,000.00 b Cat besi 0.13 kg 35,000.00 c Kuas 0.01 bh 13,550.00 d Ampelas 0.50 lbr 3,500.00 e Perancah kayu 0.01 m3 55,000.00 f Pembantu Tukang 0.20 org 35,000.00 g Tukang cat 0.20 org 40,000.00

JumlahDibulatkan

XVIII PEKERJAAN LISTRIK1 Pasang 1 Titik Stop Kontak

a Stop Kontak 1.00 bh 20,000.00 b Kabel Listrik NYM 3 x 2,5 mm 0.25 rol 400,000.00 c Accecories ( 20 % material ) 1.00 ls 20,000.00 d Pembantu Tukang 0.20 org 35,000.00 e Tukang listrik 0.60 org 45,000.00

JumlahDibulatkan

2 Pasang 1 Titik lampua Saklar 1.00 bh 20,000.00 b Kabel Listrik NYM 2 x 2,5 mm 0.25 rol 350,000.00 c Accecories ( 20 % material ) 1.00 ls 17,500.00 d Pembantu Tukang 0.20 org 35,000.00 e Tukang listrik 0.60 org 45,000.00

JumlahDibulatkan

3 Pasang 1 Buah Lampu SL a Lampu SL 1.00 bh 55,000.00 b Accecories ( 1 % alat ) 1.00 ls 550.00 c Tukang listrik 0.10 org 45,000.00

JumlahDibulatkan

4 Pasang 1 Buah Lampu TLa Lampu TL 1.00 bh 55,000.00 b Accecories ( 1 % alat ) 1.00 ls 550.00 c Tukang listrik 0.12 org 45,000.00

JumlahDibulatkan

5 Pasang 1 Buah Lampu Bareta Lampu Baret 1.00 bh 85,000.00 b Accecories ( 1 % alat ) 1.00 ls 850.00 c Tukang listrik 0.15 org 45,000.00

JumlahDibulatkan

Page 48: MENGHITUNG RAB

No. URAIAN KOEFISIEN SAT HARGA SATUAN6 Pasang 1 Buah Lampu Pijar

a Lampu Pijar 1.00 bh 5,000.00 b Accecories ( 1 % alat ) 1.00 ls 50.00 c Tukang listrik 0.10 org 45,000.00

JumlahDibulatkan

7 Pasang 1 Buah Lampu Tamana Lampu Taman 1.00 bh 140,000.00 b Accecories ( 1 % alat ) 1.00 ls 1,400.00 c Tukang listrik 0.35 org 45,000.00

JumlahDibulatkan

8 Pasang 1 Buah Panela Panel Listrik standart untuk Rumah 1.00 bh 250,000.00 b Accecories ( 10 % alat ) 1.00 ls 25,000.00 c Tukang listrik 1.00 org 45,000.00

Jumlah

Dibulatkan

XIX PEKERJAAN WATERPROOFING1 Pasang 1 m2 Waterproofing Membran

a Material Primer 2.50 kg 6,500.00 b Waterproofing Membrane 1.10 m2 55,000.00 c Pengetesan ( 10 % material ) 1.00 ls 6,050.00 d Pembantu Tukang 0.20 org 35,000.00 e Tukang Batu 0.60 org 45,000.00

JumlahDibulatkan

2 Pasang 1 m2 Waterproofing Coatinga Pre treatment / Cleaning ( 10 % material ) 1.00 m2 4,100.00 b Bahan Waterproofing Coating 1.00 kg 41,000.00 c Kuas 3 " 0.25 bh 13,550.00 d Pembantu Tukang 0.20 org 35,000.00 e Tukang Batu 0.60 org 45,000.00

JumlahDibulatkan

3 Pasang 1 m2 Floor Harderner a Material Natural non Metalic 1.10 kg 41,000.00 b Accecories ( 10 % alat ) 1.00 ls 451.00 c Pembantu Tukang 0.20 org 35,000.00 d Tukang Batu 0.60 org 45,000.00

Jumlah

Dibulatkan

Page 49: MENGHITUNG RAB

ANALISA HARGA SATUAN PEKERJAAN

JUMLAH (RP)

160,000.00 2,400.00 51,600.00 900.00 1,602.00 160,000.00 660.00 6,525.00 9,000.00 3,500.00 396,187.00 396,180.00

160,000.00 1,920.00 362,500.00 900.00 1,602.00 660.00 9,000.00 10,500.00 547,082.00 547,080.00

64,000.00 220.00 9,200.00 4,500.00 3,500.00 81,420.00 81,420.00

64,000.00 414,000.00 9,350.00 10,450.00 1,680,000.00 24,750.00 18,000.00 26,700.00 16,500.00 69,120.00 31,000.00 32,000.00 3,840.00 6,750.00 3,000.00 90,000.00 45,000.00 70,000.00 2,614,460.00 2,614,460.00

Page 50: MENGHITUNG RAB

JUMLAH (RP)

64,000.00 230,000.00 3,300.00 10,080.00 5,400.00 8,900.00 69,120.00 45,000.00 35,000.00 470,800.00 470,800.00

3,500.00 3,500.00 3,500.00

7,000.00 7,000.00 7,000.00

70,000.00 70,000.00 70,000.00

14,500.00 8,250.00 1,450.00 35,000.00 59,200.00 59,200.00

217,000.00 217,000.00 217,000.00

161,000.00 161,000.00 161,000.00

66,000.00 64,000.00 14,400.00 26,700.00 24,000.00 5,850.00 13,300.00 214,250.00

214,200.00

Page 51: MENGHITUNG RAB

JUMLAH (RP)

14,000.00 720.00 14,720.00 14,720.00

18,550.00 720.00 19,270.00 19,270.00

25,900.00 720.00 26,620.00 26,620.00

15,750.00 720.00 16,470.00 16,470.00

875.00 540.00 1,415.00 1,410.00

14,700.00 720.00 15,420.00 15,400.00

6,650.00 720.00 7,370.00 7,300.00

17,500.00 720.00 18,220.00 18,200.00

174,000.00 10,500.00

Page 52: MENGHITUNG RAB

JUMLAH (RP) 720.00 185,220.00 185,200.00

134,400.00 10,500.00 720.00 145,620.00 145,600.00

198,000.00 8,750.00 720.00 207,470.00

207,400.00

159,500.00 193,920.00 80,025.00 52,500.00 27,000.00 512,945.00 512,940.00

159,500.00 156,480.00 85,800.00 52,500.00 27,000.00 481,280.00 481,280.00

159,500.00 130,560.00 89,760.00 52,500.00 27,000.00 459,320.00 459,320.00

174,000.00 43,500.00 27,300.00 17,550.00 262,350.00 262,300.00

Page 53: MENGHITUNG RAB

JUMLAH (RP) 322,560.00 97,200.00 144,180.00 70,000.00 15,750.00 649,690.00 649,600.00

8,925.00 168.00 245.00 315.00 9,653.00 9,600.00

92,000.00 1,290.00 1,200.00 10,500.00 11,700.00 116,690.00 116,600.00

425,000.00 193,920.00 57,600.00 87,220.00 8,960.00 58,000.00 70,000.00 38,250.00 938,950.00 938,900.00

65,250.00 268,800.00 81,000.00 119,260.00 83,300.00 13,500.00 631,110.00 631,100.00

18,000.00 26,700.00 58,080.00 382,500.00 10,080.00 102,400.00 33,000.00 1,320.00

Page 54: MENGHITUNG RAB

JUMLAH (RP) 1,080.00 4,560.00 35,000.00 30,150.00 702,870.00 702,800.00

14,400.00 23,140.00 47,040.00 293,250.00 7,840.00 96,000.00 33,000.00 1,320.00 1,080.00 3,800.00 28,000.00 22,500.00 571,370.00 571,300.00

10,800.00 19,580.00 39,360.00 293,250.00 6,720.00 96,000.00 33,000.00 1,210.00 960.00 3,800.00 28,000.00 22,500.00 555,180.00

555,100.00

460,000.00 16,500.00 4,800.00 1,062,500.00 25,200.00 310,080.00 93,600.00 138,840.00 136,500.00 15,750.00 46,800.00 47,250.00 2,357,820.00 2,357,800.00

Page 55: MENGHITUNG RAB

JUMLAH (RP)

460,000.00 16,500.00 4,800.00 1,275,000.00 25,200.00 310,080.00 93,600.00 138,840.00 140,000.00 18,000.00 45,000.00 45,000.00 2,572,020.00 2,572,000.00

460,000.00 16,500.00 4,800.00 1,062,500.00 23,520.00 310,080.00 93,600.00 138,840.00 136,500.00 18,000.00 45,000.00 45,000.00 2,354,340.00 2,354,300.00

460,000.00 16,500.00 4,800.00 1,275,000.00 25,200.00 310,080.00 93,600.00 138,840.00 140,000.00 18,000.00 45,000.00 45,000.00 2,572,020.00

2,572,000.00

Page 56: MENGHITUNG RAB

JUMLAH (RP)

209,280.00 93,600.00 154,860.00 70,000.00 15,750.00 543,490.00 543,400.00

222,720.00 93,600.00 138,840.00 70,000.00 15,750.00 540,910.00 540,900.00

322,560.00 97,200.00 144,180.00 70,000.00 15,750.00 649,690.00 649,600.00

372,480.00 117,000.00 115,700.00 70,000.00 15,750.00 690,930.00 690,900.00

384,000.00 99,000.00 124,600.00 70,700.00 18,000.00 696,300.00 696,300.00

8,925.00 224.00 350.00 450.00 9,949.00 9,900.00

Page 57: MENGHITUNG RAB

JUMLAH (RP) 9,790.00 168.00 350.00 900.00 11,208.00 11,200.00

103,500.00 3,300.00 1,200.00 10,500.00 11,700.00 130,200.00 130,200.00

92,000.00 4,400.00 2,400.00 128,000.00 36,750.00 10,500.00 14,850.00 288,900.00 288,900.00

92,000.00 4,400.00 2,400.00 128,000.00 36,750.00 11,200.00 14,850.00 289,600.00 289,600.00

92,000.00 4,400.00 2,400.00 128,000.00 36,750.00 11,200.00 14,850.00 289,600.00 289,600.00

69,000.00 4,400.00 1,800.00 64,000.00 36,750.00 11,200.00

Page 58: MENGHITUNG RAB

JUMLAH (RP) 14,850.00 202,000.00 202,000.00

621,000.00 22,000.00 7,200.00 1,700,000.00 33,600.00 384,000.00 93,600.00 138,840.00 157,500.00 15,750.00 70,200.00 63,000.00 3,306,690.00 3,306,600.00

920,000.00 44,000.00 24,000.00 1,062,500.00 50,400.00 309,600.00 93,600.00 138,840.00 960,000.00 367,500.00 255,500.00 15,750.00 148,500.00 94,500.00 4,484,690.00 4,484,600.00

920,000.00 44,000.00 24,000.00 1,275,000.00 50,400.00 309,600.00 93,600.00 138,840.00 960,000.00 367,500.00 255,500.00 15,750.00 148,500.00 94,500.00

Page 59: MENGHITUNG RAB

JUMLAH (RP) 4,697,190.00 4,697,100.00

920,000.00 44,000.00 24,000.00 1,360,000.00 50,400.00 309,600.00 93,600.00 138,840.00 960,000.00 367,500.00 255,500.00 15,750.00 148,500.00 94,500.00 4,782,190.00 4,782,100.00

920,000.00 44,000.00 24,000.00 1,487,500.00 50,400.00 309,600.00 93,600.00 138,840.00 960,000.00 367,500.00 255,500.00 15,750.00 148,500.00 94,500.00 4,909,690.00 4,909,600.00

920,000.00 44,000.00 24,000.00 1,700,000.00 50,400.00 309,600.00 93,600.00 138,840.00 960,000.00 367,500.00 255,500.00 15,750.00 148,500.00 94,500.00 5,122,190.00 5,122,100.00

Page 60: MENGHITUNG RAB

JUMLAH (RP)

920,000.00 44,000.00 24,000.00 2,125,000.00 50,400.00 309,600.00 93,600.00 138,840.00 960,000.00 367,500.00 255,500.00 15,750.00 148,500.00 94,500.00 5,547,190.00 5,547,100.00

920,000.00 44,000.00 24,000.00 2,550,000.00 50,400.00 309,600.00 93,600.00 138,840.00 960,000.00 367,500.00 255,500.00 15,750.00 148,500.00 94,500.00 5,972,190.00 5,972,100.00

736,000.00 35,200.00 19,200.00 1,062,500.00 25,200.00 309,600.00 93,600.00 138,840.00 384,000.00 294,000.00 595,200.00 203,000.00 15,750.00 126,000.00 47,250.00 4,085,340.00 4,085,300.00

736,000.00 35,200.00 19,200.00

Page 61: MENGHITUNG RAB

JUMLAH (RP) 1,275,000.00 25,200.00 309,600.00 93,600.00 138,840.00 384,000.00 294,000.00 595,200.00 203,000.00 15,750.00 126,000.00 47,250.00 4,297,840.00 4,297,800.00

736,000.00 35,200.00 19,200.00 1,700,000.00 33,600.00 309,600.00 93,600.00

#REF!#REF!#REF!#REF!#REF!#REF!#REF!#REF!#REF!

736,000.00 35,200.00

Page 62: MENGHITUNG RAB

JUMLAH (RP) 19,200.00 2,125,000.00 67,200.00 309,600.00 93,600.00 138,840.00 448,000.00 294,000.00 297,600.00 208,600.00 15,750.00 126,000.00 63,000.00 4,977,590.00 4,977,500.00

575,000.00 33,000.00 14,400.00 1,700,000.00 33,600.00 309,600.00 93,600.00 138,840.00 960,000.00 262,500.00 196,000.00 15,750.00 103,500.00 63,000.00 4,498,790.00 4,498,700.00

1 m3 MEMBUAT PLAT LANTAI Tb. 10 Cm BETON BERTULANG ( 100 kg BESI + BEKISTING ) 649,600.00 2,896,000.00 850,000.00 4,395,600.00 4,395,600.00

1 m3 MEMBUAT PLAT LANTAI Tb. 12 Cm BETON BERTULANG ( 115 kg BESI + BEKISTING ) 649,600.00 2,412,368.00 1,138,500.00 4,200,468.00 4,200,400.00

1 m3 MEMBUAT PLAT LANTAI Tb. 12 Cm BETON BERTULANG ( 125 kg BESI + BEKISTING ) 649,600.00 2,412,368.00 1,237,500.00 4,299,468.00 4,299,400.00

1 m3 MEMBUAT PLAT LANTAI Tb. 15 Cm BETON BERTULANG ( 100 kg BESI + BEKISTING )

Page 63: MENGHITUNG RAB

JUMLAH (RP) 649,600.00 1,931,632.00 990,000.00 3,571,232.00 3,571,200.00

1 m3 MEMBUAT PLAT LANTAI Tb. 20 Cm BETON BERTULANG ( 115 kg BESI + BEKISTING ) 649,600.00 2,172,000.00 1,138,500.00 3,960,100.00 3,960,100.00

621,000.00 22,000.00 7,200.00 1,487,500.00 33,600.00 384,000.00 93,600.00 138,840.00 169,750.00 18,000.00 78,750.00 65,250.00 3,119,490.00

3,119,400.00

77,000.00 31,200.00

Page 64: MENGHITUNG RAB

JUMLAH (RP) 14,850.00 22,750.00 9,000.00 154,800.00 154,800.00

77,000.00 26,400.00 14,850.00 22,750.00 9,000.00 150,000.00 150,000.00

77,000.00 21,600.00 16,500.00 22,750.00 9,000.00 146,850.00 146,800.00

38,500.00 13,920.00 6,600.00 11,200.00 4,500.00 74,720.00 74,700.00

38,500.00 12,000.00 8,250.00 11,200.00 4,500.00 74,450.00 74,400.00

38,500.00 10,560.00 8,250.00 11,200.00 4,500.00 73,010.00 73,000.00

129,500.00 12,960.00 6,600.00 10,500.00 4,500.00

Page 65: MENGHITUNG RAB

JUMLAH (RP) 164,060.00 164,000.00

525,000.00 1,134.00 10,500.00 4,500.00 541,134.00 541,100.00

30,000.00 12,000.00 4,950.00 10,500.00 6,750.00 64,200.00 64,200.00

33,750.00 9,600.00 3,300.00 10,500.00 6,750.00 63,900.00 63,900.00

20,000.00 74,425.00 10,500.00 9,000.00 113,925.00 113,900.00

6,720.00 3,300.00 7,000.00 6,750.00

Page 66: MENGHITUNG RAB

JUMLAH (RP) 23,770.00 23,700.00

6,240.00 3,300.00 7,000.00 6,750.00 23,290.00 23,200.00

4,800.00 3,300.00 7,000.00 6,750.00 21,850.00 21,800.00

4,320.00 3,300.00 7,000.00 6,750.00 21,370.00 21,300.00

8,160.00 4,950.00 7,700.00 7,200.00 28,010.00 28,000.00

7,200.00 4,950.00 8,750.00 9,000.00 29,900.00 29,900.00

5,280.00 4,125.00 5,250.00 3,150.00 17,805.00 17,800.00

9,120.00 3,300.00 9,100.00 9,000.00 30,520.00 30,500.00

Page 67: MENGHITUNG RAB

JUMLAH (RP)

7,200.00 3,300.00 9,100.00 9,000.00 28,600.00 28,600.00

480.00 1,650.00 2,100.00 1,800.00 6,030.00 6,000.00

3,840.00 4,900.00 4,950.00 13,690.00 13,600.00

4,320.00 3,300.00 5,250.00 3,150.00 16,020.00

16,000.00

205,000.00 7,680.00 3,547.50 84.00 8,750.00 5,400.00

Page 68: MENGHITUNG RAB

JUMLAH (RP) 230,461.50 230,460.00

195,000.00 7,680.00 3,300.00 84.00 9,100.00 5,625.00 220,789.00 220,780.00

265,000.00 8,640.00 3,547.50 54.60 8,750.00 5,400.00 291,392.10 291,390.00

292,000.00 8,160.00 3,547.50 84.00 9,100.00 6,300.00 319,191.50 319,190.00

35,000.00 8,640.00 3,300.00 84.00 7,700.00 18,000.00 72,724.00 72,720.00

38,000.00 8,160.00 3,547.50 84.00 10,500.00 6,750.00 67,041.50 67,040.00

38,500.00 8,160.00 3,547.50

Page 69: MENGHITUNG RAB

JUMLAH (RP) 84.00 10,500.00 6,750.00 67,541.50 67,540.00

39,000.00 7,680.00 3,300.00 84.00 8,750.00 5,400.00 64,214.00 64,210.00

41,000.00 7,680.00 3,300.00 84.00 8,750.00 5,400.00 66,214.00 66,210.00

133,000.00 23,040.00 16,500.00 840.00 21,700.00 15,750.00 210,830.00 210,830.00

262,500.00 18,480.00 22,750.00 15,750.00 319,480.00 319,480.00

600,000.00 23,040.00 13,200.00 420.00 21,000.00 21,600.00 679,260.00 679,260.00

Page 70: MENGHITUNG RAB

JUMLAH (RP)

36,500.00 8,640.00 3,300.00 84.00 7,700.00 18,000.00 74,224.00 74,220.00

36,000.00 8,640.00 3,300.00 84.00 7,700.00 18,000.00 73,724.00 73,720.00

38,500.00 8,160.00 3,300.00 84.00 7,000.00 17,550.00 74,594.00 74,590.00

38,000.00 8,160.00 3,300.00 84.00 7,000.00 17,550.00 74,094.00 74,090.00

38,000.00 7,680.00 2,970.00 54.60 6,562.50 16,875.00 72,142.10 72,140.00

38,500.00 7,680.00 2,970.00 54.60 6,562.50

Page 71: MENGHITUNG RAB

JUMLAH (RP) 16,875.00 72,642.10 72,640.00

133,000.00 2,240.00 12,000.00 4,125.00 6,300.00 280.00 275.00 25,200.00 29,250.00 212,670.00 212,670.00

600,000.00 1,120.00 12,000.00 4,125.00 6,300.00 280.00 275.00 25,200.00 29,250.00 678,550.00 678,550.00

72,500.00 11,520.00 5,775.00 11,200.00 11,250.00 112,245.00 112,240.00

65,000.00 12,000.00 5,775.00 11,200.00 11,250.00 105,225.00 105,220.00

19,875.00 960.00 1,650.00 420.00 2,100.00 1,350.00 26,355.00

Page 72: MENGHITUNG RAB

JUMLAH (RP) 26,350.00

21,450.00 960.00 1,650.00 504.00 2,100.00 1,350.00 28,014.00

28,010.00

6,240,000.00 210,000.00 675,000.00 7,125,000.00 7,125,000.00

4,920,000.00 210,000.00 675,000.00 5,805,000.00 5,805,000.00

3,840,000.00 210,000.00 675,000.00 4,725,000.00 4,725,000.00

214,000.00 35,000.00 112,500.00 361,500.00 361,500.00

172,000.00 35,000.00 112,500.00 319,500.00 319,500.00

126,000.00 47,250.00 126,000.00 299,250.00

Page 73: MENGHITUNG RAB

JUMLAH (RP) 299,200.00

35,200.00 19,200.00 90,000.00 144,400.00 144,400.00

275,200.00 35,000.00 135,000.00 445,200.00 445,200.00

84,280.00 330.00 7,680.00 36,000.00 21,000.00 90,000.00 239,290.00 239,200.00

258,000.00 1,650.00 17,500.00 90,000.00 367,150.00 367,100.00

64,680.00 330.00 7,680.00 36,000.00 21,000.00 90,000.00 219,690.00 219,600.00

84,280.00 3,300.00 7,680.00 94,000.00 21,000.00 90,000.00 300,260.00 300,200.00

84,280.00 3,300.00 20,480.00 36,000.00 62,500.00 28,000.00 112,500.00

Page 74: MENGHITUNG RAB

JUMLAH (RP) 347,060.00 347,000.00

84,280.00 3,300.00 20,480.00 47,000.00 17,500.00 62,500.00 28,000.00 112,500.00 375,560.00 375,500.00

1 m2 PASANG DINDING PEMISAH DOUBLE TEAKWOOD, RANGKA KAYU KAMPER MEDAN 79,950.00 30,100.00 1,100.00 14,336.00 94,000.00 5,250.00 20,250.00 244,986.00 244,900.00

79,950.00 30,100.00 1,100.00 14,336.00 36,000.00 7,000.00 27,000.00 195,486.00 195,400.00

375,000.00 37,500.00 945.00 413,445.00 413,400.00

336,000.00 180,000.00 22,000.00 7,000.00 90,000.00 116,000.00 10,500.00 58,500.00 820,000.00 129,530.00

336,000.00 41,112.00

Page 75: MENGHITUNG RAB

JUMLAH (RP) 22,000.00 7,000.00 90,000.00 116,000.00 10,500.00 58,500.00 681,112.00 129,530.00

18,900.00 4,800.00 41,112.00 14,000.00 10,000.00 5,500.00 3,640.00 3,500.00 2,250.00 103,702.00

103,700.00

4,510,000.00 142,500.00 8,800.00 6,000.00 140,000.00 540,000.00 5,347,300.00 5,347,300.00

3,520,000.00 142,500.00 8,800.00 6,000.00 140,000.00 540,000.00 4,357,300.00 4,357,300.00

38,400.00 1,650.00 3,500.00 4,500.00 48,050.00 48,000.00

Page 76: MENGHITUNG RAB

JUMLAH (RP)

44,800.00 1,650.00 3,500.00 4,500.00 54,450.00 54,400.00

30,960.00 550.00 3,500.00 9,000.00 44,010.00 44,000.00

47,300.00 550.00 3,850.00 9,900.00 61,600.00 61,600.00

3,360,000.00 2,200.00 70,000.00 90,000.00 3,522,200.00 3,522,200.00

27,500.00 5,250.00 3,375.00 36,125.00 36,120.00

82,500.00 7,680.00 5,280.00 10,500.00 9,000.00 114,960.00 114,960.00

37,200.00 550.00 4,900.00 3,015.00 45,665.00 45,660.00

Page 77: MENGHITUNG RAB

JUMLAH (RP) 23,975.00 1,320.00 4,900.00 3,150.00 33,345.00 33,340.00

25,200.00 1,320.00 4,900.00 3,150.00 34,570.00 34,570.00

38,500.00 1,320.00 4,900.00 3,015.00 47,735.00 47,730.00

39,882.00 1,320.00 4,900.00 3,015.00 49,117.00 49,110.00 49,117.00 36,800.00 1,320.00 4,900.00 3,150.00 46,170.00 46,170.00

72,000.00 2,200.00 3,500.00 9,000.00 86,700.00 86,700.00

79,200.00 330.00 7,000.00 4,500.00 91,030.00 91,030.00

134,640.00 2,200.00

Page 78: MENGHITUNG RAB

JUMLAH (RP) 7,000.00 4,500.00 148,340.00 148,340.00

54,250.00 550.00 10,368.00 5,280.00 4,200.00 14,000.00 9,000.00 97,648.00 97,640.00

58,300.00 550.00 8,750.00 6,750.00 74,350.00 74,350.00

30,100.00 220.00 4,200.00 2,700.00 37,220.00 37,220.00

32,550.00 440.00 5,250.00 3,150.00 41,390.00 41,390.00

207,900.00 67,500.00 41,580.00 5,250.00 2,250.00 324,480.00

324,480.00

4,410.00 882.00 5,250.00 2,250.00 12,792.00

12,790.00

Page 79: MENGHITUNG RAB

JUMLAH (RP)

38,400.00 1,100.00 5,250.00 11,250.00 56,000.00 56,000.00

50,160.00 110.00 1,050.00 3,150.00 54,470.00 54,470.00

15,400.00 110.00 1,050.00 3,150.00 19,710.00 19,710.00

108,000.00 550.00 2,100.00 4,500.00 115,150.00 115,150.00

108,000.00 1,680.00 2,500.00 108,000.00 5,250.00 9,000.00 234,430.00 234,430.00

14,850.00 110.00 1,750.00

Page 80: MENGHITUNG RAB

JUMLAH (RP) 2,250.00 18,960.00 18,960.00

4,730.00 110.00 1,750.00 2,250.00 8,840.00 8,840.00

73,600.00 660.00 14,040.00 9,450.00 18,000.00 115,750.00 115,750.00

73,600.00 660.00 36,660.00 9,450.00 18,000.00 138,370.00 138,370.00

73,600.00 2,200.00 107,000.00 12,250.00 22,500.00 217,550.00 217,550.00

18,675.00 4,800.00 20,784.40 14,000.00 10,000.00 3,960.00 3,500.00 3,500.00 2,250.00 81,469.40

81,460.00

2,265,000.00 226,500.00

Page 81: MENGHITUNG RAB

JUMLAH (RP) 115,500.00 49,500.00 2,656,500.00 2,656,500.00

146,000.00 5,760.00 1,650.00 35,000.00 67,500.00 255,910.00 255,910.00

377,000.00 113,100.00 5,760.00 1,650.00 35,000.00 45,000.00 577,510.00 577,510.00

202,000.00 24,240.00 5,760.00 1,650.00 42,000.00 65,250.00 340,900.00 340,900.00

245,000.00 29,400.00 5,760.00 1,650.00 42,000.00 65,250.00 389,060.00 389,060.00

125,000.00 350.00 4,500.00 129,850.00 129,850.00

150,000.00 27,000.00 63,000.00 121,500.00 361,500.00 361,500.00

82.50 42,240.00 11,550.00

Page 82: MENGHITUNG RAB

JUMLAH (RP) 4,550.00 14,240.00 10,800.00 112,000.00 45,900.00 241,362.50 241,360.00

173,000.00 69,500.00 1,050.00 13,500.00 257,050.00 257,050.00

54,900.00 1,098.00 350.00 4,500.00 60,848.00 60,840.00

155,000.00 3,100.00 350.00 4,500.00 162,950.00 162,950.00

59,000.00 350.00 4,500.00 63,850.00 63,850.00

30,000.00 350.00 4,500.00 34,850.00

34,850.00

11,550.00 3,150.00 1,890.00 4,050.00 20,640.00 20,640.00

Page 83: MENGHITUNG RAB

JUMLAH (RP) 19,250.00 5,250.00 1,890.00 4,050.00 30,440.00 30,440.00

27,500.00 7,500.00 1,890.00 4,050.00 40,940.00 40,940.00

33,000.00 9,000.00 3,780.00 8,100.00 53,880.00 53,880.00

7,150.00 1,950.00 3,500.00 8,100.00 20,700.00 20,700.00

9,350.00 2,550.00 4,550.00 9,900.00 26,350.00 26,350.00

4,620.00 1,260.00 1,260.00 2,700.00 9,840.00 9,840.00

5,500.00 1,500.00 1,050.00 2,700.00 10,750.00 10,750.00

7,150.00 1,950.00

Page 84: MENGHITUNG RAB

JUMLAH (RP) 1,260.00 2,700.00 13,060.00 13,060.00

9,350.00 2,550.00 1,890.00 4,050.00 17,840.00 17,840.00

18,700.00 5,100.00 2,835.00 6,075.00 32,710.00 32,710.00

199,650.00 30,450.00 1,222,650.00 1,120,800.00 1,260,120.00 91,800.00 696,000.00 75,000.00 217,770.00 153,000.00 8,249.00 140,000.00 135,000.00 5,350,489.00 5,350,480.00

750,000.00 187,500.00 2,835.00 6,075.00 946,410.00

946,410.00

10,780.00 1,280.00 539.00 2,200.00

Page 85: MENGHITUNG RAB

JUMLAH (RP) 1,800.00 2,100.00 18,699.00 18,690.00

10,780.00 1,600.00 539.00 1,650.00 1,780.00 1,800.00 2,100.00 20,249.00 20,240.00

10,450.00 1,600.00 522.50 1,650.00 1,780.00 1,800.00 2,100.00 19,902.50 19,900.00

165,000.00 67,500.00 36,750.00 269,250.00 269,250.00

375,000.00 47,250.00 36,750.00 459,000.00 459,000.00

109,250.00 54,000.00 42,000.00 205,250.00 205,250.00

12,100.00 220.00 7,740.00 3,500.00 4,500.00 28,060.00 28,060.00

31,000.00 165.00

Page 86: MENGHITUNG RAB

JUMLAH (RP) 31,680.00 3,625.00 5,250.00 18,000.00 89,720.00 89,720.00

15,500.00 165.00 62,700.00 4,350.00 1,400.00 18,000.00 102,115.00 102,110.00

165,000.00 67,500.00 36,750.00 269,250.00 269,250.00

375,000.00 47,250.00 36,750.00 459,000.00 459,000.00

757,680.00 872,160.00 115,200.00 84,000.00 38,000.00 21,800.00 104,702.40 151,536.00 174,432.00 2,319,510.40 2,319,510.00

1 Unit Kusen Jendela Aluminium 3 lubang dgn 2 daun jendela dan 1 kaca mati (ukuran 2 x 1,5 m) 984,000.00 872,160.00 144,000.00 84,000.00 38,000.00

Page 87: MENGHITUNG RAB

JUMLAH (RP) 21,800.00 120,009.60 196,800.00 174,432.00 2,263,969.60 2,263,960.00

1 Unit Kusen Pintu Jendela gendong Aluminium dgn 2 jndl dan 1 pnt teakwood (ukr 2,2 x 2,7 m) 1,397,280.00 1,175,520.00 190,080.00 540,360.00 84,000.00 38,000.00 43,600.00 67,500.00 29,000.00 15,000.00 138,144.00 16,800.00 7,600.00 3,742,884.00 3,742,880.00

619,920.00 21,600.00 504,336.00 67,500.00 29,000.00 15,000.00 38,491.20 123,984.00 1,419,831.20 1,419,830.00

172,800.00 80,000.00 10,368.00 24,796.80 287,964.80 287,960.00

295,200.00 24,000.00 17,712.00 4,959.36 341,871.36 341,870.00

Page 88: MENGHITUNG RAB

JUMLAH (RP)

210,000.00 2,100.00 27,000.00 239,100.00 239,100.00

45,000.00 350.00 22,500.00 67,850.00 67,850.00

49,000.00 175.00 22,500.00 71,675.00 71,670.00

22,500.00 525.00 6,750.00 29,775.00 29,770.00

21,000.00 350.00 4,500.00 25,850.00 25,850.00

10,900.00 525.00 6,750.00 18,175.00 18,170.00

348,000.00 1,750.00 22,500.00 372,250.00 372,250.00

45,000.00 1,750.00 22,500.00 69,250.00 69,250.00

Page 89: MENGHITUNG RAB

JUMLAH (RP) 55,000.00 1,750.00 22,500.00 79,250.00 79,250.00

29,000.00 1,750.00 22,500.00 53,250.00 53,250.00

19,000.00 1,750.00 22,500.00 43,250.00 43,250.00

15,600.00 1,750.00 22,500.00 39,850.00 39,850.00

52,800.00 525.00 6,750.00 60,075.00 60,070.00

72,600.00 525.00 6,750.00 79,875.00

79,870.00

137,500.00 525.00 6,750.00 144,775.00

144,770.00

2,050.00

Page 90: MENGHITUNG RAB

JUMLAH (RP)1,750.00

800.00 4,600.00 4,600.00

2,310.00 495.00

1,050.00 1,400.00 2,000.00 7,255.00 7,250.00

1 m2 Pengecatan Kayu Lama 4,000.00 2,550.00 3,500.00 5,850.00

21,600.00 1,750.00 6,000.00

45,250.00 45,250.00

8,000.00 2,550.00 3,500.00 5,850.00

12,600.00 1,750.00 6,000.00

40,250.00 40,250.00

4,950.00 5,775.00 7,000.00 1,750.00 6,000.00

25,475.00 25,470.00

4,425.00 5,775.00 7,000.00 1,750.00 6,000.00

24,950.00 24,950.00

1,085.00 5,250.00

Page 91: MENGHITUNG RAB

JUMLAH (RP)800.00

7,135.00 7,130.00

1,900.00 265.00

6,750.00 550.00

1,750.00 2,100.00 8,000.00

21,315.00 21,310.00

1,900.00 265.00

22,000.00 550.00

1,750.00 2,100.00 8,000.00

36,565.00 36,560.00

11,000.00 265.00 550.00

1,750.00 2,100.00 8,000.00

23,665.00 23,660.00

25,560.00 3,040.00

265.00 550.00

1,750.00 7,000.00

12,000.00 50,165.00 50,160.00

18,720.00 6,160.00

700.00 6,000.00

31,580.00 31,580.00

1,600.00

Page 92: MENGHITUNG RAB

JUMLAH (RP)135.50 700.00

8,000.00 10,435.50 10,430.00

1,600.00 4,550.00

135.50 1,750.00

550.00 7,000.00 8,000.00

23,585.50 23,580.00

20,000.00 100,000.00 20,000.00

7,000.00 27,000.00 174,000.00 174,000.00

20,000.00 87,500.00 17,500.00

7,000.00 27,000.00 159,000.00 159,000.00

55,000.00 550.00 4,500.00 60,050.00 60,050.00

55,000.00 550.00 5,400.00 60,950.00 60,950.00

85,000.00 850.00 6,750.00 92,600.00 92,600.00

Page 93: MENGHITUNG RAB

JUMLAH (RP)

5,000.00 50.00 4,500.00 9,550.00 9,550.00

140,000.00 1,400.00 15,750.00 157,150.00 157,150.00

250,000.00 25,000.00 45,000.00 320,000.00

320,000.00

16,250.00 60,500.00 6,050.00

7,000.00 27,000.00 116,800.00 116,800.00

4,100.00 41,000.00 3,387.50

7,000.00 27,000.00 82,487.50 82,480.00

45,100.00 451.00

7,000.00 27,000.00 79,551.00

79,550.00

Page 94: MENGHITUNG RAB

DAFTAR HARGA SATUAN PEKERJAAN

I. PEKERJAAN PERSIAPAN

NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN

1 Pagar sementara seng gelombang 2 m 1 M1 396,180.00

2 Pagar kawat Berduri T = 1,8 m 1 M1 547,080.00

3 Pengukuran & Pemasangan Bowplank 1 M2 81,420.00

4 Pembuatan kantor Direksi 1 M2 2,614,460.00

5 Pembuatan Gudang Proyek 1 M2 470,800.00

6 Membersihkan lokasi Proyek 1 M2 3,500.00

7 Membersihkan Puing-puing 1 M2 7,000.00

8 Membersihkan Tunggul Tanaman 1 M2 70,000.00

9 Pembuatan jalan sementara 1 M2 59,200.00

10 Pembongkaran Beton Bertulang 1 M3 217,000.00

11 Pembongkaran Dinding Tembok Bata Merah 1 M3 161,000.00

12 Pekerjaan Pagar papan rangka Balok 1 M2 214,200.00

II. PEKERJAAN TANAH

NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN

1 Galian tanah sedalam 1 m 1 M3 14,720.00

2 Galian tanah sedalam 2 m 1 M3 19,270.00

3 Galian tanah sedalam 3 m 1 M3 26,620.00

4 Galian tanah keras sedalam 1 m 1 M3 16,470.00

5 Pekerjaan pengupasan tanah setebal 10 cm 1 M2 1,410.00

6 Pembuangan tanah sejauh 150 m 1 M3 15,400.00

7 Urugan tanah kembali 1 M3 7,300.00

8 Pemadatan Tanah 1 M3 18,200.00

9 Urugan pasir 1 M3 185,200.00

10 Urugan tanah 1 M3 145,600.00

11 Urugan sirtu 1 M3 207,400.00

III. PEKERJAAN PONDASI

NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN

1 Pasang pondasi batu kali 1 Pc : 3 Psr 1 M3 512,940.00

2 Pasang pondasi batu kali 1 Pc : 4 Psr 1 M3 481,280.00

3 Pasang pondasi batu kali 1 Pc : 5 Psr 1 M3 459,320.00

4 Pasang pondasi batu kosong 1 M3 262,300.00

5 Membuat Beton Bertulang untuk Pondasi 1 Pc : 2 Psr : 3 Splt 1 M3 649,600.00

6 Penulangan beton Pondasi 1 Kg 9,600.00

7 Pekerjaan Bekisting untuk Pondasi 1 M2 116,600.00

8 Pasang pondasi cycloop, 50 % beton : 40 % batu kali 1 M3 938,900.00

9 Pasang pondasi sumuran Dia. 100 cm 1 M3 631,100.00

10 Pembuatan pondasi tiang beton bertulang 40 x 40 cm 1 M1 702,800.00

11 Pembuatan pondasi tiang beton bertulang 35 x 35 cm 1 M1 571,300.00

12 Pembuatan pondasi tiang beton bertulang 25 x 25 cm 1 M1 555,100.00

13 Pembuatan Pondasi Plat Beton ( penulangan 125 kg/m3 & bekisting ) 1 M3 2,357,800.00

14 Pembuatan Pondasi Plat Beton ( penulangan 150 kg/m3 & bekisting ) 1 M3 2,572,000.00

15 Pembuatan Pondasi Beton Borepile ( penulangan 125 kg/m3 & bekisting ) 1 M3 2,354,300.00

16 Pembuatan Pondasi Beton Borepile ( penulangan 150 kg/m3 & bekisting ) 1 M3 2,572,000.00

IV. PEKERJAAN BETON NON STRUKUR DAN BETON STRUKTUR

NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN

A PEKERJAAN BETON

1 Membuat Beton Non Struktur, 1 Pc : 3 Psr : 5 Splt 1 M3 543,400.00

2 Membuat Beton Struktur, 1 Pc : 2 Psr : 4 Splt 1 M3 540,900.00

3 Membuat Beton Struktur 1 Pc : 2 Psr : 3 Splt 1 M3 649,600.00

4 Membuat Betn Struktur dengan mutu K 225 1 M3 690,900.00

5 Membuat Betn Struktur dengan mutu K 275 1 M3 696,300.00

B PEKERJAAN PEMBESIAN

1 Penulangan Beton/Besi Beton Polos 1 KG 9,900.00

2 Penulangan Beton/Besi Beton Ulir 1 KG 11,200.00

C PEKERJAAN BEKISTING

1 Pasang Bekisting Untuk Sloof 1 M2 130,200.00

Page 95: MENGHITUNG RAB

2 Pasang Bekisting Untuk Kolom 1 M2 288,900.00

3 Pasang Bekisting Untuk Balok 1 M2 289,600.00

4 Pasang Bekisting Untuk Lantai 1 M2 289,600.00

5 Pasang Bekisting Untuk Tangga 1 M2 202,000.00

D PEKERJAAN BETON BERTULANG

1 Membuat Sloof Beton Bertulang ( 200 Kg Besi + Bekisting ) 1 M3 3,306,600.00

2 Membuat Kolom Beton Bertulang ( 125 Kg Besi + Bekisting ) 1 M3 4,484,600.00

3 Membuat Kolom Beton Bertulang ( 150 Kg Besi + Bekisting ) 1 M3 4,697,100.00

4 Membuat Kolom Beton Bertulang ( 160 Kg Besi + Bekisting ) 1 M3 4,782,100.00

5 Membuat Kolom Beton Bertulang ( 175 Kg Besi + Bekisting ) 1 M3 4,909,600.00

6 Membuat Kolom Beton Bertulang ( 200 Kg Besi + Bekisting ) 1 M3 5,122,100.00

7 Membuat Kolom Beton Bertulang ( 250 Kg Besi + Bekisting ) 1 M3 5,547,100.00

8 Membuat Kolom Beton Bertulang ( 300 Kg Besi + Bekisting ) 1 M3 5,972,100.00

9 Membuat Balok Beton Bertulang ( 125 Kg Besi + Bekisting ) 1 M3 4,085,300.00

10 Membuat Balok Beton Bertulang ( 150 Kg Besi + Bekisting ) 1 M3 4,297,800.00

11 Membuat Balok Beton Bertulang ( 200 Kg Besi + Bekisting ) 1 M3 0.00

12 Membuat Balok Beton Bertulang ( 225 Kg Besi + Bekisting ) 1 M3 #REF!

13 Membuat Balok Beton Bertulang ( 250 Kg Besi + Bekisting ) 1 M3 4,977,500.00

14 Membuat Tangga Beton Bertulang ( 200 Kg Besi + Bekisting ) 1 M3 4,498,700.00

15 Membuat Plat Lantai tebal 10 Cm Beton Bertulang ( 100 Kg Besi + Bekisting ) 1 M3 4,395,600.00

16 Membuat Plat Lantai tebal 12 Cm Beton Bertulang ( 115 Kg Besi + Bekisting ) 1 M3 4,200,400.00

17 Membuat Plat Lantai tebal 12 Cm Beton Bertulang ( 125 Kg Besi + Bekisting ) 1 M3 4,299,400.00

18 Membuat Plat Lantai tebal 15 Cm Beton Bertulang ( 100 Kg Besi + Bekisting ) 1 M3 3,571,200.00

19 Membuat Plat Lantai tebal 20 Cm Beton Bertulang ( 115 Kg Besi + Bekisting ) 1 M3 3,960,100.00

20 Membuat Ring Balk Beton Bertulang ( 175 Kg Besi + Bekisting ) 1 M3 3,119,400.00

Page 96: MENGHITUNG RAB

V. PEKERJAAN DINDING

NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN

1 Pasangan Bata Merah Tebal 1 Bata, Campuran 1 Pc : 3 Psr 1 M2 154,800.00

2 Pasangan Bata Merah Tebal 1 Bata, Campuran 1 Pc : 4 Psr 1 M2 150,000.00

3 Pasangan Bata Merah Tebal 1 Bata, Campuran 1 Pc : 5 Psr 1 M2 146,800.00

4 Pasangan Bata Merah Tebal ½ Bata, Campuran 1 Pc : 3 Psr 1 M2 74,720.00

5 Pasangan Bata Merah Tebal ½ Bata, Campuran 1 Pc : 4 Psr 1 M2 74,400.00

6 Pasangan Bata Merah Tebal ½ Bata, Campuran 1 Pc : 5 Psr 1 M2 73,000.00

7 Pasang Dinding Rooster / Terawang ( 12x11x24 ) 1 M2 164,000.00

8 Pasang Dinding Glassblock 1 M2 541,100.00

9 Pasangan Bataco Putih, Campuran 1 Pc : 5 Psr 1 M2 64,200.00

10 Pasangan Bataco Press Semen, Campuran 1 Pc : 5 Psr 1 M2 63,900.00

11 Pasangan Bata Ringan (Hebel/Celcon) 1 M2 113,900.00

VI. PEKERJAAN PLESTERAN/ACCI

NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN

1 Plesteran Campuran 1 Pc : 2 Psr Tebal 1,5 Cm 1 M2 23,700.00

2 Plesteran Campuran 1 Pc : 3 Psr Tebal 1,5 Cm 1 M2 23,200.00

3 Plesteran Campuran 1 Pc : 4 Psr Tebal 1,5 Cm 1 M2 21,800.00

4 Plesteran Campuran 1 Pc : 5 Psr Tebal 1,5 Cm 1 M2 21,300.00

5 Plesteran Campuran 1 Pc : 4 Psr Tebal 2 Cm 1 M2 28,000.00

6 Plesteran Campuran 1 Pc : 5 Psr Tebal 2 Cm 1 M2 29,900.00

7 Berapen Campuran 1 Pc : 5 Psr Tebal 1,5 Cm 1 M2 17,800.00

8 Plesteran Beton Campuran 1 Pc : 2 Psr Tebal 1,5 Cm 1 M2 30,500.00

9 Plesteran Beton Campuran 1 Pc : 3 Psr Tebal 1,5 Cm 1 M2 28,600.00

10 Plesteran Ban/Skoneng Campuran 1 Pc : 2 Psr 1 M1 6,000.00

11 Accian Plesteran 1 M2 13,600.00

12 Plesteran Siar Camuran 1 Pc : 2 Psr 1 M2 16,000.00

VII. PEKERJAAN PELAPIS LANTAI

NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN

1 Pasang Lantai keramik ukuran 40 x 40 cm Polish 1 M2 230,460.00

2 Pasang Lantai keramik ukuran 40 x 40 cm Unpolish 1 M2 220,780.00

3 Pasang Lantai keramik ukuran 60 x 60 cm 1 M2 291,390.00

4 Pasang Lantai keramik ukuran 60 x 90 cm 1 M2 319,190.00

5 Pasang Lantai Keramik 10 x 20 cm 1 M2 72,720.00

6 Pasang Lantai Keramik polos 20 x 20 cm 1 M2 67,040.00

7 Pasang Lantai Keramik motif 20 x 20 cm 1 M2 67,540.00

8 Pasang Lantai Keramik polos 30 x 30 cm 1 M2 64,210.00

9 Pasang Lantai Keramik motif 30 x 30 cm 1 M2 66,210.00

10 Pasang Lantai Marmer 1 M2 210,830.00

11 Pasang Lantai Parquet Jati 1 M2 319,480.00

12 Pasang Lantai Granit 1 M2 679,260.00

VIII. PEKERJAAN PELAPIS DINDING

NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN

1 Pasang Dinding Keramik Motif 10 x 20 cm 1 M2 74,220.00

2 Pasang Dinding Keramik polos 10 x 20 cm 1 M2 73,720.00

3 Pasang Dinding Keramik Motif 20 x 20 cm 1 M2 74,590.00

4 Pasang Dinding Keramik polos 20 x 20 cm 1 M2 74,090.00

5 Pasang Dinding Keramik polos 20 x 25 cm 1 M2 72,140.00

6 Pasang Dinding Keramik Motif 20 x 25 cm 1 M2 72,640.00

7 Pasang Dinding Marmer 1 M2 212,670.00

8 Pasang Dinding Granit standart 1 M2 678,550.00

9 Pasang Dinding Batu Tempel Hitam 1 M2 112,240.00

10 Pasang Dinding Batu Alam 1 M2 105,220.00

11 Pasang Plint Keramik Ukuran 10 x 40 Cm 1 M1 26,350.00

12 Pasang Plint Keramik Ukuran 10 x 30 Cm 1 M1 28,010.00

IX. PEKERJAAN KUSEN, PINTU, JENDELA, PARTISI

NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN

1 Pasang Kusen Pintu & Jendela Kayu Kamper Samarinda 1 M3 7,125,000.00

2 Pasang Kusen Pintu & Jendela Kayu Kamper Medan / Kruing 1 M3 5,805,000.00

3 Pasang Kusen Pintu & Jendela Kayu Borneo Super 1 M3 4,725,000.00

4 Pasang Pintu Panel Kayu Kamper Samarinda 1 M2 361,500.00

5 Pasang Pintu Panel Kayu Kamper Medan / Kruing 1 M2 319,500.00

Page 97: MENGHITUNG RAB

6 Pasang Pintu dan Jendela Kaca Kayu Kamper Medan 1 M2 299,200.00

7 Pasang Pintu dan Jendela Kaca Kayu Borneo 1 M2 144,400.00

8 Pasang Pintu dan Jendela Jalusi Kayu Kamper Medan 1 M2 445,200.00

9 Pasang Pintu Triplek Rangkap , Rangka Kayu Kamper Medan 1 M2 239,200.00

10 Pasang Jalusi Mati Kusen Kayu Kamper Medan 1 M2 367,100.00

11 Pasang Pintu Triplek Rangkap , Rangka Kayu Borneo Super 1 M2 219,600.00

12 Pasang Pintu Teakwood Rangkap , Rangka Kayu Kamper Medan 1 M2 300,200.00

13 Pasang Pintu Triplek & Formika Rangka Kayu Kamper Medan 1 M2 347,000.00

14 Pasang Pintu Teakwood & Formika Rangka Kayu Kamper Medan 1 M2 375,500.00

15 Pasang Dinding Pemisah Double Teakwood, Rangka Kayu Kamper Medan 1 M2 244,900.00

16 Pasang Dinding Pemisah Double GRC, Rangka Kayu Kamper Medan 1 M2 195,400.00

17 Pasang Pintu Aluminium / pintu PVC 1 bh 413,400.00

18 Pasang Kusen Partisi Double Triplek 1 M2 129,530.00

19 Pasang Kusen Partisi Double GyPsrum + Rangka Kayu 1 M2 129,530.00

20 Pasang Dinding Partisi Gysum Board + Rangka Besi Hollow 1 M2 103,700.00

Page 98: MENGHITUNG RAB

X. PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP

NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN

A PEKERJAAN RANGKA ATAP

1 Pekerjaan Konstruksi Kuda-kuda Kayu Kamper Medan 1 M3 5,347,300.00

2 Pekerjaan Konstruksi Kuda-kuda Kayu Borneo Super 1 M3 4,357,300.00

3 Pasang Kaso + Reng Genteng Plentong Kayu Borneo Super 1 M2 48,000.00

4 Pasang Kaso + Reng Genteng Beton Kayu Borneo Super 1 M2 54,400.00

5 Pasang Lisplang Kayu Kamper Medan Ukuran 3 x 20 Cm 1 M2 44,000.00

6 Pasang Lisplang Kayu Kamper Medan Ukuran 3 x 30 Cm 1 M2 61,600.00

7 Pekerjaan Nok/gording/juray kayu Borneo super 1 M3 3,522,200.00

B PEKERJAAN PENUTUP ATAP

1 Pasang Atap Genteng Plentong 1 M2 36,120.00

2 Pasang Nok/Bubungan Genteng keramik glazur 1 M1 114,960.00

3 Pasang Atap Fibreglass Ukuran 180 x 90 cm 1 M2 45,660.00

4 Pasang Atap Asbes Gelombang Ukuran 2,70 x 1,05 m Tebal 4 mm 1 M2 33,340.00

5 Pasang Atap Asbes Gelombang Ukuran 2,40 x 1,05 m Tebal 4 mm 1 M2 34,570.00

6 Pasang Atap Asbes Gelombang Ukuran 2,70 x 1,02 m Tebal 4 mm 1 M2 47,730.00

7 Pasang Atap Asbes Gelombang Ukuran 2,40 x 1,02 m Tebal 4 mm 1 M2 49,110.00

8 Pasang Atap Asbes Gelombang Ukuran 1,50 x 1,02 m Tebal 4 mm 1 M2 46,170.00

9 Pasang Atap Genteng Sirap 1 M2 86,700.00

10 Pasang Atap Genteng Beton 1 M2 91,030.00

11 Pasang Atap Genteng Metal 1 M2 148,340.00

12 Pasang Nok Genteng Beton 1 M1 97,640.00

13 Pasang Nok Genteng Metal 1 M1 74,350.00

14 Pasang Atap Seng Gelombang 1 M2 37,220.00

15 Pasang Nok Seng untuk Atap Seng Gelombang 1 M1 41,390.00

16 Pasang Atap Polycarbonate + rangka 1 M2 324,480.00

17 Pasang Alluminium Foil / Sisalation 1 M2 12,790.00

18 Pasang Rangka atap Baja ringan ( pabrikan ) 1 M2 160,000.00

XI. PEKERJAAN PENUTUP PLAFOND

NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN

1 Pasang rangka Plafond ( 0,50 x 1,00 ) m, Kayu Borneo Super 1 M2 56,000.00

2 Plafond GRC ( 6,00 x 1,20 ) m, tebal 4 mm 1 M2 54,470.00

3 Plafond Asbes ( 1,00 x 1,00 ) m, tebal 5 mm 1 M2 19,710.00

4 Plafond Akustik ( 60 x 120 ) cm 1 M2 115,150.00

5 Plafond Akustik ( 60 x 120 ) cm + Rangka Alluminium 1 M2 234,430.00

6 List Plafond Profil Kayu 1 M1 18,960.00

7 Plafond Triplek 4 mm + Rangka Kayu Borneo Super 1 M2 115,750.00

8 Plafond Teakwood 4 mm + Rangka Kayu Borneo Super 1 M2 138,370.00

9 Plafond Papan 10 cm, tebal 1 cm + Rangka Kayu Borneo Super 1 M2 217,550.00

10 Plafond GyPsrum Board, tebal 9 mm + rangka besi hollow 1 M2 81,460.00

11 List Plafond Kayu 1/4 1 M1 8,840.00

VIII. PEKERJAAN SANITAIR

NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN

1 Memasang Kloset Duduk / Monoblok 1 BH 2,656,500.00

2 Memasang Kloset Jongkok porselen 1 BH 255,910.00

3 Memasang Urinoir 1 BH 577,510.00

4 Memasang Wastafel Dinding 1 BH 340,900.00

5 Memasang Wastafel kaki 1 BH 389,060.00

6 Memasang Shower dinding 1 BH 129,850.00

7 Memasang Bak mandi Fibreglass ukuran sedang 1 BH 361,500.00

8 Memasang Bak kontrol pasangan batu bata ukuran ( 30 x 30 ) cm, tinggi 35 cm 1 BH 241,360.00

9 Memasang Kitchen Zink / bak cuci piring stailess steel 1 BH 257,050.00

10 Memasang Kran diameter 3/4 " atau 1/2 " 1 BH 60,840.00

11 Memasang Kran angsa 1 BH 162,950.00

12 Memasang Floor drain 1 BH 63,850.00

13 Memasang Tempat Sabun 1 BH 34,850.00

14 Septictank Jadi 1,5 m3 ( fiber semen ) 1 BH 1,500,000.00

15 Membuat Septictank pasangan bata dan rembesan 1UNIT 5,350,480.00

IX. PEKERJAAN PERPIPAAN DAN POMPA

NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN

1 Memasang pipa galvanis diameter 1/2" ( GIP ) 1 M1 20,640.00

Page 99: MENGHITUNG RAB

2 Memasang pipa galvanis diameter 3/4" (GIP ) 1 M1 30,440.00

3 Memasang pipa galvanis diameter 1" ( GIP ) 1 M1 40,940.00

4 Memasang pipa galvanis diameter 1,5" (GIP ) 1 M1 53,880.00

5 Memasang pipa PVC type D diameter 3" 1 M1 20,700.00

6 Memasang pipa PVC type D diameter 4" 1 M1 26,350.00

7 Memasang pipa PVC type AW diameter 1/2" 1 M1 9,840.00

8 Memasang pipa PVC type AW diameter 3/4" 1 M1 10,750.00

9 Memasang pipa PVC type AW diameter 1" 1 M1 13,060.00

10 Memasang pipa PVC type AW diameter 2" 1 M1 17,840.00

11 Memasang pipa PVC type AW diameter 4" 1 M1 32,710.00

12 Memasang Pompa Air 1 BH 946,410.00

13 Penyambungan pipa PAM 1LS 750,000.00

XII. PEKERJAAN PENUTUP BESI DAN BAJA

NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN

1 Pasang Rangka Atap Baja 1 KG 18,690.00

2 Pasang Rangka Atap Besi Siku 1 KG 20,240.00

3 Pasang Gording Besi C 1 KG 19,900.00

4 Pasang Pintu Rolling Door Besi 1 M2 269,250.00

5 Pasang Pintu Besi ukuran 0,8 x 2 m 1 M2 459,000.00

6 Pasang Teralis Besi 1 M2 205,250.00

7 Pasang Kawat Harmonika 1 M2 28,060.00

8 Pasang Talang Datar, Seng BJLS 1 M1 89,720.00

9 Pasang Talang Miring, Seng plat BJLS 1 M1 102,110.00

XIII. PEKERJAAN ALUMINIUM

NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN

1 Pasang Pintu Roling door Aluminium 1 M2 269,250.00

2 Pasang Pintu Aluminium Pabrikan ( pintu jadi ) 1 M2 459,000.00

3 Kusen jendela Aluminium 2 lubang dgn 2 daun jendela 1 UNIT 2,319,510.00

4 Kusen jendela Aluminium 3 lubang dgn 2 daun jendela dan 1 kaca mati 1 UNIT 2,263,960.00

5 Kusen gendong dgn jendela Aluminium 2 lubang dan 1 pintu teakwood 1 UNIT 3,742,880.00

6 Kusen Pintu Aluminium ukr 0.9 x 2,7 m 1 UNIT 1,419,830.00

7 Bovenlight Aluminium 0,5 x 1 m dengan kisi-kisi aluminium plat 1 BH 287,960.00

8 Bovenlight Aluminium 0,5 x 1 m dengan bagian dalam kaca 1 BH 341,870.00

Page 100: MENGHITUNG RAB

XIV. PEKERJAAN KACA DAN PENGGANTUNG

NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN

1 Pasang Kunci Tanam Besar 1 BH 239,100.00

2 Pasang Kunci Tanam Sedang 1 BH 67,850.00

3 Pasang Kunci bulat putar Kamar Mandi 1 BH 71,670.00

4 Pasang Engsel Pintu 1 BH 29,770.00

5 Pasang Engsel Jendela 1 BH 25,850.00

6 Pasang Kait Angin 1 BH 18,170.00

7 Pasang Door Closer 1 BH 372,250.00

8 Pasang Pegangan Pintu / Door Holder 1 BH 69,250.00

9 Pasang Penahan Pintu / Door Stoper 1 BH 79,250.00

10 Pasang Grendel / sloot pintu 1 BH 53,250.00

11 Pasang Grendel / sloot jendela 1 BH 43,250.00

12 Pasang Tarikan jendela 1 BH 39,850.00

13 Pasang Kaca polos, tebal 3 mm 1 M2 60,070.00

14 Pasang Kaca polos, tebal 5 mm 1 M2 79,870.00

15 Pasang Kaca Ray band, tebal 5 mm 1 M2 144,770.00

XV. PEKERJAAN PENGECATAN

NO URAIAN SATUAN BIAYA (Rp.) KETERANGAN

1 Mengikis / Mengerok / mengelupas Permukaan Cat Tembok Lama 1 M2 4,600.00

2 Mendempul Dan Menggosok Kayu 1 M2 7,250.00

3 Pengecatan Kayu Lama 1 M2 45,250.00

4 Pengecatan Kayu Baru 1 M2 40,250.00

5 Pengecatan Kayu dengan Politur 1 M2 25,470.00

6 Pengecatan Kayu dengan Melamik 1 M2 24,950.00

7 Pengecatan Kayu dengan Cat Residu/Ter 1 M2 7,130.00

8 Pengecatan Tembok/Plafond Baru Kwalitas Sedang 1 M2 21,310.00

9 Pengecatan Tembok/Plafond Baru Kwalitas Baik 1 M2 36,560.00

10 Pengecatan Tembok Lama 1 M2 1,750.00

11 Pengecatan exterior 1 M2 50,160.00

12 Memasang Wallpaper 1 M2 31,580.00

13 Pengecatan Permukaan Baja dengan Meni Besi 1 M2 10,430.00

14 Pengecatan Permukaan Baja dengan Meni Besi dan cat 1 M2 23,580.00

XVI. PEKERJAAN LISTRIKNO URAIAN SATUAN BIAYA (Rp.) KETERANGAN1 Pasang titik Stop kontak 1 TTK 174,000.00 2 Pasang titik Lampu 1 TTK 159,000.00 3 Pasang Lampu SL 1 M2 60,050.00 4 Pasang Lampu TL 1 M2 60,950.00 5 Pasang Lampu Baret 1 M2 92,600.00 6 Pasang Lampu Pijar 1 M2 9,550.00 7 Pasang Taman 1 M2 157,150.00 8 Pasang Panel Listrik 1 M2 320,000.00 9 Penyambungan daya Listrik 1LS 2,000,000.00

Page 101: MENGHITUNG RAB

Daftar Rencana Anggaran Biaya

NO. URAIAN PEKERJAAN VOLUME

HARGA SATUAN

SATUAN

I. PEKERJAAN PERSIAPAN, GALIAN DAN URUGAN

1 Pekerjaan persiapan lahan (pembersihan lokasi pekerjaan) 127.50 m²

2 Pekerjaan pengukuran dan pasangan bouw plank 55.00 m1

3 Pekerjaan galian tanah untuk pondasi 53.96 m³

4 Urugan tanah kembali sisi pondasi 19.29 m³

5 Urugan tanah untuk peninggian lantai 8.27 m³

6 Pekerjaan urugan pasir di bawah pondasi 3.46 m³

7 Pekerjaan urugan pasir di bawah lantai 3.3 m³

II PEKERJAAN PONDASI DAN BETON

1 Membuat Pondasi Batu belah 1 Pc : 5 Psr 31.21 m³

2 Membuat Sloof Beton Bertulang ( 200 KG Besi + Bekisting ) 2.37 m³

3 Membuat Kolom Beton Bertulang ( 150 KG Besi + Bekisting ) 2.23 m³

4 Membuat Ring Balok Beton Bertulang ( 150 KG Besi + Bekisting ) 2.90 m³

5 Membuat Plat dak topi Beton Bertulang ( 115 KG Besi + Bekisting ) 0.15 m³

6 Membuat Meja dapur plat Beton Bertulang ( 125 KG Besi + Bekisting ) 0.14 m³

7 Membuat Beton lantai kerja dibawah lantai 1 PC : 3 Splt: 5 Psr 2.40 m³

III PEKERJAAN PASANGAN DAN PLESTERAN

1 Pasangan dinding bata merah 1 : 3 22.65 m²

2 Pasangan dinding bata merah 1 : 5 199.70 m²

3 Pasangan rolaag bata merah teras dan tangga 1:3 ( Pas. 1 Bata ) 0.70 m²

4 Dinding bata rooster 1: 5 berlubang ukrn 20 x 20 cm di tmn belakang 3.00 m²

5 Plesteran dan aci 1 : 3 45.30 m²

6 Plesteran dan aci 1 : 5 400.12 m²

7 Accian 445.42 m²

8 Plesteran terkstur dinding bagian depan 1:3 3 m²

9 Ban plesteran 5 cm x 7 cm diaci 24 m1

NO. URAIAN PEKERJAAN VOLUME

HARGA SATUAN

SATUAN

IV PEKERJAAN LANTAI DAN DINDING

Page 102: MENGHITUNG RAB

1 Pasangan lantai keramik motif 30 cm x 30 cm 42.37 m²

2 Pasangan lantai keramik polos 20 cm x 20 cm u/ (KM/WC) 2.63 m²

3 Pasangan lantai keramik polos 30 cm x 30 cm untuk teras depan 3.00 m²

4 Pasangan lantai keramik polos 20 cm x 20 cm untuk teras belakang 3.00 m²

5 Pasangan dinding keramik 20 cm x 20 cm u/ KM (WC) 11.50 m²

6 Pasangan dinding keramik 20 cm x 20 cm u/ meja dapur 9.00 m²

7 Pasangan dinding bata tempel 1.80 m²

8 Pasangan plint keramik 10 cm x 30 cm 60

V PEKERJAAN ATAP

1 Pasangan kuda-kuda kayu borneo super 8/12 1.92 m³

2 Pasangan gording dan nok kayu 8/12 0.65 m³

3 Pasangan rangka atap kaso 5/7 dan reng 3/4 kayu borneo super 100.00 m²

4 Pasangan jurai luar dan dalam kayu 8/12 0.18 m³

5 Pasangan lisplank kayu kamper medan 3/30 23.00

6 Pasangan talang juray seng (BJLS) 30 dan Papan 13.00

7 Pasangan atap genteng beton 100.00 m²

8 Pasangan nok genteng beton 17.00

9 Pasangan atap garasi polycarbonate dengan rangka besi hollow 9.60 m²

VI PEKERJAAN PLAFON

1 Pasangan plafon triplek + rangka plafon kayu borneo super 4/6 70.20 m²

2 Pasangan plafon kayu ramin 3.00 m²

3 Pasangan lis plafon kayu profil 5 cm ( yg menempel dinding ) 60.00

4 Pasangan lis plafon kayu 1 cm x 4 cm ( yg menempel pada listplank ) 26.00

NO. URAIAN PEKERJAAN VOLUME

HARGA SATUAN

SATUAN

VII PEKERJAAN KUSEN, PINTU DAN JENDELA

1 Pasangan kusen kayu kamper samarinda 6/15 0.88 m³

2 Pasangan kusen sopi-sopi kayu kamper samarinda 6/15 0.12 m³

3 Pasangan daun pintu panel double teakwood rangka kayu kamper 7.20 m²

4 Pasangan daun pintu besi 1.00 Bh

5 Pasangan daun pintu dan kusen PVC (pabrikasi) 1.00 Bh

6 Pasangan daun jendela kayu kamper 8.45 m²

7 Pasangan boven light di atas kusen pintu dan jendela (25 cm x 25 cm) 5.42 Bh

VIII PEKERJAAN PERLENGKAPAN PINTU DAN JENDELA

m1

m1

m1

m1

m1

m1

Page 103: MENGHITUNG RAB

1 Pasangan kunci pintu 2 slaag (putaran) untuk pintu kayu dan pintu besi 5.00 Bh

2 Pasangan kunci pintu KM (WC) tipe alpha bulat 1.00 Bh

3 Pasangan engsel pintu standard 4 inci 12.00 Bh

4 Pasangan engsel jendela standard 3 inci 24.00 Bh

5 Pasangan grendel pintu dobel dan pintu garasi 4.00 Bh

6 Pasangan grendel jendela 12.00 Bh

7 Pasangan kait angin jendela 12.00 Bh

8 Pasangan tarikan jendela 12.00 Bh

9 Pasangan kaca polos 3 mm 10.29 m²

10 Pasangan kaca polos 5 mm 10.19 m²

IX PEKERJAAN SANITAIR

1 Pasangan bak mandi fiber glass 1.00 Bh

2 Pasangan kloset jongkok 1.00 Bh

3 Pasangan kran air KM / WC 1.00 Bh

4 Pasangan kran air taman 3.00 Bh

5 Pasangan kran air meja dapur tipe angsa 1.00 Bh

6 Pasangan floor drain KM / WC 1.00 Bh

7 Pasangan kitchen zink meja dapur 1.00 Bh

NO. URAIAN PEKERJAAN VOLUME

HARGA SATUAN

SATUAN

X PASANGAN INSTALASI AIR

Instalasi Air Bersih

1 Pasangan pipa PVC diameter 3/4 inci 20.00

5 Pasangan pipa PVC diameter 2 inci 10.50

8 Pasangan pipa PVC diameter 4 inci 7.50

10 Accesoris lain (lem pipa, ampelas, sambungan, dll 10 % pipa) 1.00 Ls

11 Pekerjaan septic tank dan rembesan 1.00 Unit

12 Pasangan penyambung air bersih ke PAM 1.00 Ls

XI PEKERJAAN INSTALSI LISTRIK

1 Pasangan instalasi titik nyala lampu kabel NYM 3 x 2,5 mm 13.00 Ttk

2 Pasangan instalasi daya stop kontak kabel NYM 3x2,5 mm 3.00 Ttk

3 Pasangan lampu baret 18 watt 1.00 Bh

4 Pasangan lampu SL 18 watt 4.00 Bh

5 Pasangan lampu TL 1 x 18 watt 6.00 Bh

6 Pasangan lampu taman 40 watt lengkap dengan tiang besi diameter 2 inci 2.00 Bh

7 Pasangan panel listrik 1.00 Bh

8 Pasangan penyambung daya ke PLN 1.00 Ls

m1

m1

m1

Page 104: MENGHITUNG RAB

XII PEKERJAAN PENGECATAN

1 Pengecatan dinding dengan cat tembok kwalitas baik 448.42 m²

2 Pengecatan plafon dengan cat tembok kwalitas sedang 70.20 m²

3 Pengecatan plafon Ramin dengan cat melamin 3.00 m²

4 Pengecatan lis plank dengan cat minyak 9.20 m²

5 Pengecatan lis plafon dengan cat minyak 6.02 m²

6 Pengecatan kusen dengan cat minyak 41.16 m²

7 Pengecatan sopi-sopi dengan cat minyak 5.13 m²

8 Pengecatan bovenlight dengan cat minyak 10.84 m²

9 Pengecatan daun pintu dengan cat minyak 14.40 m²

10 Pengecatan daun jendela dengan cat minyak 16.90 m²

NO. URAIAN PEKERJAAN VOLUME

HARGA SATUAN

SATUAN

XIII PEKERJAAN LAIN-LAIN

1 Pembersihan lahan setelah selesai pekerjaan 127.50 m²

Page 105: MENGHITUNG RAB

Daftar Rencana Anggaran Biaya

HARGA SATUAN

JUMLAH HARGA (Rp)Rp

3,500.00 446,250.00

81,420.00 4,478,100.00

14,720.00 794,291.20

7,300.00 140,817.00

145,600.00 1,204,112.00 185,200.00 640,792.00

185,200.00 611,160.00

Jumlah 8,315,522.20

Dibulatkan 8,315,520.00

-

459,320.00 14,335,377.20

3,306,600.00 7,836,642.00

4,697,100.00 10,474,533.00

4,085,300.00 11,847,370.00

4,200,400.00 630,060.00

4,299,400.00 601,916.00

543,400.00 1,304,160.00

Jumlah 47,030,058.20

Dibulatkan 47,030,050.00

74,720.00 1,692,408.00

73,000.00 14,578,100.00

154,800.00 108,360.00

164,000.00 492,000.00

23,200.00 1,050,960.00

21,300.00 8,522,556.00

13,600.00 6,057,712.00

28,600.00 85,800.00

6,000.00 144,000.00

Jumlah 32,731,896.00

Dibulatkan 32,731,890.00

HARGA SATUAN

JUMLAH HARGA (Rp)Rp

Page 106: MENGHITUNG RAB

66,210.00 2,805,317.70

67,040.00 176,315.20

64,210.00 192,630.00

67,040.00 201,120.00

65,890.00 757,735.00

65,890.00 593,010.00

112,240.00 202,032.00

28,010.00 1,680,600.00

Jumlah 6,608,759.90

Dibulatkan 6,608,750.00

4,357,300.00 8,366,016.00

3,522,200.00 2,289,430.00 54,400.00 5,440,000.00

3,522,200.00 633,996.00

61,600.00 1,416,800.00

102,110.00 1,327,430.00

91,030.00 9,103,000.00

97,640.00 1,659,880.00

324,480.00 3,115,008.00

Jumlah 33,351,560.00

Dibulatkan 33,351,560.00

115,750.00 8,125,650.00

217,550.00 652,650.00

18,960.00 1,137,600.00

8,840.00 229,840.00

Jumlah 10,145,740.00

Dibulatkan 10,145,740.00

HARGA SATUAN

JUMLAH HARGARp

7,125,000.00 6,270,000.00

7,125,000.00 855,000.00

300,200.00 2,161,440.00

459,000.00 459,000.00

413,400.00 413,400.00

144,400.00 1,220,180.00

367,100.00 1,989,682.00

Jumlah 13,368,702.00

Dibulatkan 13,368,700.00

Page 107: MENGHITUNG RAB

239,100.00 1,195,500.00

71,670.00 71,670.00

29,770.00 357,240.00

25,850.00 620,400.00

53,250.00 213,000.00

43,250.00 519,000.00

18,170.00 218,040.00

39,850.00 478,200.00

60,070.00 618,120.30

79,870.00 813,875.30

Jumlah 5,105,045.60

Dibulatkan 5,105,040.00

361,500.00 361,500.00

255,910.00 255,910.00

60,840.00 60,840.00

60,840.00 182,520.00

162,950.00 162,950.00

63,850.00 63,850.00

257,050.00 257,050.00

Jumlah 1,344,620.00

Dibulatkan 1,344,620.00

HARGA SATUAN

JUMLAH HARGARp

30,440.00 608,800.00

17,840.00 187,320.00

32,710.00 245,325.00

104,144.50 104,144.50

5,350,480.00 5,350,480.00

750,000.00 750,000.00

Jumlah 7,246,069.50

Dibulatkan 7,246,060.00

174,000.00 2,262,000.00

159,000.00 477,000.00

92,600.00 92,600.00

60,050.00 240,200.00

60,950.00 365,700.00

157,150.00 314,300.00

320,000.00 320,000.00

2,000,000.00 2,000,000.00

Page 108: MENGHITUNG RAB

Jumlah 6,071,800.00

Dibulatkan 6,071,800.00

36,560.00 16,394,235.20

21,310.00 1,495,962.00

24,950.00 74,850.00

40,250.00 370,300.00

40,250.00 242,305.00

40,250.00 1,656,690.00

40,250.00 206,482.50

40,250.00 436,310.00

40,250.00 579,600.00

40,250.00 680,225.00

Jumlah 22,136,959.70

Dibulatkan 22,136,950.00

HARGA SATUAN

JUMLAH HARGARp

7,000.00 892,500.00

Jumlah 892,500.00

Dibulatkan 892,500.00

Page 109: MENGHITUNG RAB

REKAPITULASI BIAYA KESELURUHAN

NO. URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN, GALIAN DAN URUGANII PEKERJAAN PONDASI DAN BETONIII PEKERJAAN PASANGAN DAN PLESTERANIV PEKERJAAN LANTAI DAN DINDINGV PEKERJAAN ATAPVI PEKERJAAN PLAFONVII PEKERJAAN KUSEN PINTU DAN JENDELAVIII PEKERJAAN PERLENGKAPAN PINTU DAN JENDELAIX PEKERJAAN SANITAIRX PEKERJAAN INSTALASI AIRXI PEKERJAAN INSTALASI LISTRIKXII PEKERJAAN PENGECATANXIII PEKERJAAN PEMBERSIHAN

JUMLAHDIBULATKAN

Page 110: MENGHITUNG RAB

REKAPITULASI BIAYA KESELURUHAN

JUMLAH HARGA (Rp)

8,315,520.00 47,030,050.00 32,731,890.00 6,608,750.00 33,351,560.00 10,145,740.00 13,368,700.00 5,105,040.00 1,344,620.00 7,246,060.00 6,071,800.00 22,136,950.00 892,500.00 194,349,180.00 194,349,000.00


Top Related