PROYEK AKHIR PU
Perencanaan Pelaksanaan ProyekPengaspalan Jalan Bungadidi Poreang
STA0+000 - STA1+500 Kab. Luwu Utara
Prov. Sulawesi Selatan
Pembimbing :
Ir. Sulchan Arifin, M.Eng.
Andi Bangsawang.L
Dipresentasikan Oleh :
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
2/42
Perencanaan Pelaksanaan Proyek Pengaspalan JalanBungadidi Poreang STA0+000 - STA1+500
Kab. Luwu Utara Prov. Sulawesi Selatan
BAB I PENDAHULUAN
BAB II TINJAUAN PUSTAKA
BAB III METODOLOGI
BAB IV JENIS, VOLUME & METODE PELAKSANAAN PEKERJAAN
BAB V RENCANA ANGGARAN BIAYA (RAB)
BAB VI PERENC. & JADWAL KEGIATAN & SUMBER DAYA PROYEK
BAB VII KESIMPULAN
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
3/42
BAB I
PENDAHULUAN
LATAR BELAKANG
Proyek pengaspalan jalan Bungadidi - PoreangKab.Luwu Utara Prov. Sulawesi Selatan dilaksanakan untukmeningkatkan mutu pelayanan jalan dengan merubah kondisijalan yang ada menjadi kondisi jalan yang mantap.
Sebelum pelaksanaan pekerjaan dimulai, dibutuhkansuatu perencanaan yang betul-betul terencana dan matang agarmenghasilkanproyek yang efektif dan efisien.
Sehubungan dengan hal tersebut maka kami mencobamemberikan alternatif perencanaan pelaksanaan proyektersebutdiatas dalamproyek akhir ini.
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
4/42
PERUMUSAN MASALAH
Permasalahanyang timbul dari latarbelakang di atas adalah :
1. Bagaimana memperhitungkan Rencana Anggaran Biaya(RAB) yang dibutuhkan untuk penyelesaian proyek ?
2. Bagaimana merencanakan kebutuhan bahan, peralatan
dan tenaga kerja yang efektif dan efisien berdasarkankondisi dilapangan ?
3. Bagaimana merencanakan jadwal pelaksanaan & sumberdaya proyek yang efektif dan efisien berdasarkan metode
PDM ? ?
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
5/42
1.Tujuan Penulisan1.Tujuan Penulisan
TUJUAN PENULISAN
Dengan berlandaskan pada perumusan masalah, makatujuandari penulisan proyekakhir ini adalahsebagai berikut :
1. Dapat mengetahui Rencana Anggaran Biaya (RAB) yangdibutuhkanuntukpenyelesaianproyek
2. Dapat mengetahui kebutuhan bahan, peralatan dantenaga kerja yang efektif dan efisien berdasarkan kondisilapangan
3. Dapat mengetahui penjadwalan kegiatan & sumber dayaproyek yang efektifdan efisien berdasarkanmetode PDM
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
6/42
1.Tujuan Penulisan1.Tujuan Penulisan
BATASAN MASALAH
Batasanmasalahdalampenulisan Proyek akhir ini adalah:
1. Pengadaan material /bahanproyeksudahditerima diBase camp
2. Mengingatketerbatasan waktu maka pada perencanaanini tidak membahas drainase dan gorong-gorong.
3. kebutuhan tenaga kerja mengacu kepada PanduanAnalisa Harga Satuan Kementrian PU
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
7/42
1.Tujuan Penulisan1.Tujuan Penulisan
TUJUAN
Dengan adanya penulisan proyek akhir ini diharapkan dapat
melatih mahasiswa untuk dapat mengerti dan mengatasipermasalahanyang timbul dalampelaksanaansuatu proyek..
MANFAAT
Dengan adanya penulisan proyek akhir ini diharapkan dapatmemberi manfaat kepada mahasiswa tentang prosesperhitungan RAB, kebutuhan bahan, peralatan, tenaga kerja,,dan penjadwalan kegiatan dan sumber daya proyek padasuatu proyek pengaspalan jalan.0
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
8/42
1.Tujuan Penulisan1.Tujuan Penulisan
DATA PROYEK
Adapun data proyek tersebut adalah :
1. Nama Proyek : Pengaspalan J alan Bungadidi Poreang
2. No. Kontrak : 043/17/22/SPP KONT/BM/DPU
3. Volume : 1.500 m x 3,50 m
4. Lokasi Proyek : Bungadidi Poreang Kec.Bone - BoneKab.Luwu Utara Prov. Sulawesi Selatan
5. Kontraktor : PT. Kilat Karya Konstruksi
6. Nilai Kontrak : Rp.783.637.000,-
7. Sumber Dana : DAK dan APBD Kab.Luwu Utara
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
9/42
1.Tujuan Penulisan1.Tujuan Penulisan
LOKASI PROYEK
Lokasi proyek berada di ruas Bungadidi - Poreang Kecamatan
Bone-bone Kabupaten Luwu Utara Provinsi Sulawesi Selatanseperti terlihat pada peta dibawah ini
Lokasi Proyek
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
10/42
1.Tujuan Penulisan1.Tujuan Penulisan
DETAIL LOKASI PROYEK
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
11/42
1.Tujuan Penulisan1.Tujuan Penulisan
BAB II
TINJAUAN PUSTAKA
BIAYA PEMAKAIAN PERALATAN
Biaya Pemakaian Peralatan terdiri dari :
- Biaya Pemilikan (Biaya Pasti)Yaitu biaya penyusutan dan biaya pembayaran bunga atas nilai
modal peralatan serta asuransi dan pajak
- Biaya Operasi & Pemeliharaaan , terdiri dari : Biaya Bahan Bakar Biaya Pelumas Biaya Perbaikan & Perawatan Biaya Operator
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
12/42
1.Tujuan Penulisan1.Tujuan Penulisan
PRODUKTIVITAS ALAT BERAT
Produktivitas Alat adalah besarnya keluaran volume pekerjaantertentu yang dihasilkan alat per satuan waktu.
Secara Umum Perhitungan Produktivitas alat Sebagai berikut :
Q = q x N x E
Dimana :Q = Produksi per jam dari alatq = Produksi dalam satu siklus
N = J umlah siklus dalam satu jamN = 60Cm
E = Efisiensi kerjaCm = Waktu Siklus dalam menit
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
13/42
Adapun metode penyelesaian masalah dalamProyek akhir ini adalah :
1. Pengumpulan DataData yang dikumpulkan terbagi atas dua bagian yaitua. Data Primer
Data Primer berupa teknis pelaksanaan pekerjaan yang didapatkandari hasil pengamatandilapangan.
b. Data Sekunder Peta Lokasi
Gambar Cross Section Data J enis Pekerjaan Data Harga bahan, peralatan, dantenaga kerja.
2. PerhitunganVolume PekerjaanTerdiri dari Perhitungan Volume pekerjaan Badan J alan, LPB Kelas C, LPAKelas B, Prime Coat dan Laston
BAB III
METODOLOGI
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
14/42
3. Perhitungan Rencana Anggaran Biaya, dimulai dari :
I. Harga satuan DasarII. Analisa Harga SatuanIII. Harga Satuan PekerjaanIV. Harga PekerjaanV. Estimasi Biaya proyek (OE/EE)
4. Perencanaan dan Penjadwalan Kegiatan & Sumber Daya Proyek
Perecanaan Kebutuhan Bahan Perencanaan Kebutuhan Tenaga Kerja
Perencanaan Kebutuhan Peralatan J aringan Kerja (Network Planning) PDM Diagram Batang & Kurva S J adwal Kebutuhan Bahan J adwal Kebutuhan Tenaga Kerja J adwal Kebutuhan Peralatan
1 T j P li1 T j P li
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
15/42
1.Tujuan Penulisan1.Tujuan Penulisan
DIAGRAM ALIR METODOLOGI
Pengumpulan Data
Data Primer Data Sekunder
Volume Pekerjaan
Perhitungan Rencana Anggaran Biaya
Perhitungan dan Penjadwalan Kegiatan & Sumber Daya Proyek
Kesimpulan
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
16/42
BAB IV
JENIS, VOLUME & METODE PELAKSANAAN PEKERJAAN
J enis Pekerjaan :1. Pekerjaan Persiapan
Terdiri dari Mobilisasi dan Demobilisasi serta pengaturan Lalu-Lintas selama proyek berlangsung.
2. Pekerjaan Penyiapan Badan J alanPekerjaan ini berupa penyiapan permukaan tanah dasar denganpemerataan dan pembentukan kemiringan untuk penyiapanmaterial perkerasan diatasnya.
3. Pekerjaan Lapis Pondasi Bawah Kelas CLapis pondasi bawah adalah lapis konstruksi pembagi bebankedua yang diletakkan diatas lapisan tanah dasar yang dibentukdan dipadatkan. Agregat yang digunakan adalah agregat kelas Cyang terdiri dari kerikil danbatu pecahhalus.
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
17/42
4. Pekerjaan Lapis PondasiAtas Kelas BLapis Pondasi atas adalah bagian dari konstruksi jalan yang
terletak antara lapis pondasi bawah dan lapis permukaan jalan.Agregat yang digunakan adalah agregat kelas B yang terdiri daribatu kali danbatu pecahhalus.
5. Pekerjaan Lapis Resap PengikatPrime Coat merupakan lapisan aspal yang digunakan pada
lapisan permukaan yang belum beraspal dengan komposisicampuranterdiri dari 56 % aspal dan44 % minyak tanah.Lapisan ini bertujuan memberi daya ikat antara lapis pondasiagregatdengan campuranberaspal
6. Pekerjaan LapisAspal Beton (Laston)Laston merupakan lapisan pada permukaan jalan yang terdiri darisejumlah agregat kasar, agregat halus, filler dan aspal semenyang dihasilkan dari instalasiAspaltMixing Plant (AMP).
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
18/42
Volume Pekerjaan :
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
19/42
VOLUME PEKERJAAN PENYIAPAN BADAN JALAN
PANJ ANG LEBAR LUAS
(m) (m) (m)
STA
0+000 - 1+500 1500 4,5 6750
CL
L = P X L
L
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
20/42
VOLUME PEKERJAAN LPB KELAS C
PANJ ANG LEBAR TEBAL LUAS VOLUME
(m) (m) (m) (m) (m)
0+000 - 1+500 1500 4,50 0,10 6750 675
V = P x L x T
STA
T
L
CL
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
21/42
VOLUME PEKERJAAN LPA KELAS B
PANJ ANG LEBAR TEBAL LUAS VOLUM E
(m) (m) (m) (m) (m)
0+000 - 1+500 1500 4,50 0,10 6750 675
V = P x L x T
STA
T
L
CL
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
22/42
VOLUME PEKERJAAN LAPIS RESAP PENGIKAT
PANJ ANG LEBAR LUAS VOLUME(m) (m) (m) (Liter)
0+000 - 1+500 1500 3,50 5250 0,50 2625
STA LITER/M
CL
L
V = P x L x LITER
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
23/42
VOLUME PEKERJAAN LAPIS ASPAL BETON
L = P x L
PANJ ANG LEBAR LUAS
(m) (m) (m)
0+000 - 1+500 1500 3,50 5250
STA
L
CL
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
24/42
METODE PELAKSANAAN PEKERJAAN
PENYIAPAN BADAN JALAN
1. Motor Grader meratakan dan membentuk kemiringan melintangjalan sebesar 2 %
Lokasi Pekerjaan
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
25/42
PENYIAPAN BADAN JALAN
2. Water Tank Truck menyiramkan air sejumlah 0,07 Liter/m padalokasi pekerjaan. Kemudian dilakukan pemadatan menggunakanVibrator Roller sampai didapatkepadatan CBR >5 %.
Lokasi Pekerjaan
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
26/42
METODE PELAKSANAAN PEKERJAAN
PEKERJAAN LPB KELAS C
1. Whell Loader memuat agregat ke dalam Dump Truck di Base
Camp dan selanjutnya diangkut ke lokasi pekerjaan.
Lokasi Pekerjaan
Base Camp
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
27/42
PEKERJAAN LPB KELAS C
2. Agregat kemudian dihamparkan dan dibentuk kemiringannya(2 %) menggunakan Motor Grader
Lokasi Pekerjaan
3. Hamparan agregat kemudian dipadatkan dengan menggunakanVibrator Roller dan PTR hingga dihasilkan 100 % kepadatankering maksimum sambil disiram air sejumlah 0.07 Liter/mdengan menggunakan WaterTanker
Lokasi Pekerjaan
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
28/42
METODE PELAKSANAAN PEKERJAAN
PEKERJAAN LPA KELAS B
1. Whell Loader memuat agregat ke dalam Dump Truck di BaseCamp dan selanjutnya diangkut ke lokasi pekerjaan.
Lokasi Pekerjaan
Base Camp
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
29/42
PEKERJAAN LPA KELAS B
2. Agregat kemudian dihamparkan dan dibentuk kemiringannya(2%)dengan Motor Grader
Lokasi Pekerjaan
3. Hamparan agregat kemudian dipadatkan dengan menggunakanVibrator Roller dan PTR hingga dihasilkan 100 % kepadatankering maksimum sambil disiram air sejumlah 0.07 Liter/mdengan menggunakan WaterTanker
Lokasi Pekerjaan
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
30/42
METODE PELAKSANAAN PEKERJAAN
PEKERJAAN LAPIS RESAP PENGIKAT
1. Terlebih dahulu Permukaan dibersihkan dari debu dan kotorandengan Air Compressor
Compressor
Lokasi Pekerjaan
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
31/42
PEKERJAAN LAPIS RESAP PENGIKAT
2. Selama dalampekerjaan pembersihan berlangsung, aspal dan minyak tanah
dicampur (perbandingan 56:44) dan dipanaskan dalam Aspal Sprayersehingga menjadi campuran aspal cair. Setelah mencapai temperatur 38 C- 93 C, campuran aspal cair disemprotkan dengan AsphaltSprayer ke ataspermukaanyang akandilapis.
Asphalt Sprayer
Lokasi Pekerjaan
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
32/42
METODE PELAKSANAAN PEKERJAAN
PEKERJAAN LAPIS ASPAL BETON
1. Agregat dan aspal dicampur dan dipanaskan dalam AMP. Kemudian dimuatlangsung ke dalam Dump Truck dan diangkut ke lokasi pekerjaan
Base Camp
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
33/42
PEKERJAAN LAPIS ASPAL BETON
2. Dump Truck kemudian menuangkan material Aspal ke dalamAsphalt
Finisher lalu kemudian dihampar dan diratakan. Setelahpenghamparan kemudian dilakukan pemadatan awal denganTandemRoller sebanyak 1-3 Lintasan
Material AsphalAsphal FinisherTandem Roller
Lokasi Pekerjaan
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
34/42
PEKERJAAN LAPIS ASPAL BETON
3. Selanjutnya pemadatan antara dengan rentang waktu sekitar 5 -15
menit setelah pemadatan awal dengan menggunakan PTRsebanyak 10 16 Lintasan. Kemudian Pemadatan akhir denganTandem Roller sebanyak 1 2 Lintasan dengan rentang waktu tidaklebih dari 45 menit sesudah penghamparan. Pemadatan inidilakukan untuk meningkatkanpenampakanpermukaan
Pneumatic Tyre RollerTandem Roller
Lokasi Pekerjaan
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
35/42
BAB IV
RENCANA ANGGGARAN BIAYA
Perhitungan anggaran biaya merupakan salah satu daribagian perencanaan proyek sehingga dapat diketahuialokasi biaya yang diperlukan untuk menyelesaikansuatu proyek.
HARGA SATUAN DASAR ALAT
Harga satuan dasar alat adalah keluaran dari analisa alatyang meliputi biaya pemilikan (biaya pasti) serta biaya
operasi dan pemeliharaan.
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
36/42
ANALISA HARGA SATUAN
Didalam analisa harga satuan ini dilakukan perhitungan
untuk menentukan koefisien bahan, upah tenaga kerja,dan peralatan setelah terlebih dahulu menentukanasumsi-asumsi dan faktor faktor serta prosedurkerjanya.
Terdiri dari :1. Analisa Harga Satuan Penyiapan Badan J alan2. Analisa Harga Satuan LPB kelas C3. Analisa Harga Satuan LPA kelas B4. Analisa Harga Satuan Prime Coat5. Analisa Harga Satuan Laston.
http://bab%20iv%20rab%20oke%21/Analisa%20Harga%20Satuan%20&%20Harga%20Satuan%20Pekerjaanhttp://bab%20iv%20rab%20oke%21/Analisa%20Harga%20Satuan%20&%20Harga%20Satuan%20Pekerjaanhttp://bab%20iv%20rab%20oke%21/Analisa%20Harga%20Satuan%20&%20Harga%20Satuan%20Pekerjaanhttp://bab%20iv%20rab%20oke%21/Analisa%20Harga%20Satuan%20&%20Harga%20Satuan%20Pekerjaanhttp://bab%20iv%20rab%20oke%21/Analisa%20Harga%20Satuan%20&%20Harga%20Satuan%20Pekerjaan -
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
37/42
HARGA SATUAN PEKERJAAN
Harga Satuan adalah harga suatu jenis pekerjaan tertentu persatuan tertentu berdasarkan rincian metode pelaksanaan yangmemuat jenis, kuantitas (koefisien) dan harga satuan dasar darikomponen bahan, peralatan dan tenaga kerja yang diperlukan dandidalamnya sudah termasuk biaya umum (Over Head) dan
keuntungan.
Terdiri dari :1. Harga Satuan Pekerjaan Penyiapan Badan J alan2. Harga Satuan Pekerjaan LPB kelas C3. Harga Satuan Pekerjaan LPA kelas B
4. Harga Satuan Pekerjaan Prime Coat5. Harga Satuan Pekerjaan Laston.
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
38/42
HARGA PEKERJAAN
Harga pekerjaan tercantum dalam DaftarKuantitas dan Harga (BOQ) yang merupakanhasil perkalian dari Volume Pekerjaan denganHarga Satuan pekerjaan.
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
39/42
ESTIMASI BIAYA PROYEK (OE/EE)
Harga Total Pekerjaan diperoleh dari jumlahdari total harga pekerjaan ditambah dengan
Pajak pertambahan nilai (PPN).
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
40/42
BAB VI
PERENCANAAN DAN PENJADWALAN
KEGIATAN DAN SUMBER DAYA PROYEK
Perencanaan Sumber Daya Proyek Perencanaan Bahan
Perencanaan Tenaga Kerja Perencanaan Peralatan
Penjadwalan Kegiatan & Sumber Daya Proyek PDM
Diagram Batang J adwal Kebutuhan Bahan J adwal Kebutuhan Tenaga Kerja J adwal Kebutuhan Peralatan
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
41/42
BAB VII
KESIMPULAN
Dengan terselesaikannya penulisan Tugas Akhir ini makaPenulis dapatmenyimpulkanbeberapa hal sebagai berikut :
1. Rencana anggaran biaya yang diperlukan dalam proyekpengaspalan jalan ruas Bungadidi Poreang STA 0+000 s/d
STA 1+500 Kab. Luwu Utara Prov. Sulawesi Selatan adalahsebesar Rp. 689.255.000,-
2. Kebutuhan sumber daya proyek harus direncanakan denganmatang dan terencana agar didapatkan suatu proyek yang efektif
danefisien
3. J adwal kegiatan dan sumber daya proyek mengikuti waktupelaksanaan pekerjaan yang direncanakan yaitu selama 26 harikerja
-
7/29/2019 ITS NonDegree 17136 3108038727 Presentation
42/42