7.00% 5 10 15 20
Tipe Harga Harga Harga Harga
Luas Bgn / Tnh Tunai Angsuran 12 Bln Angsuran 24 Bln KPR 5 th 10 th 15 th 20 th
MELIA 122/60
MELIA 1A22/72
MELIA 1B22/90
MELIA 230/72
MELIA 2A30/90
MELIA 2A BLV30/90
MELIA 336/90
MELIA 3 BLV36/90
3,435,635 2,659,621 2,294,100286,918,500 317,249,693 340,359,173 311,472,323 15,573,616 5,859,149
264,340,000 292,355,700 287,028,900 14,351,445 5,399,340 3,166,016 2,450,902 2,114,065
2,079,383 1,793,606224,285,500 248,045,478 243,519,768 12,175,988 4,580,884 2,686,097
292,093,500 322,968,068 317,087,198 15,854,360 5,964,771 3,497,569 2,707,566 2,335,455
1,791,396 1,545,197193,201,000 213,697,105 209,793,085 10,489,654 3,946,447 2,314,082
2,115,715 1,824,944
259,165,000 286,637,325 281,364,025 14,068,201 5,292,778 3,103,531 2,402,530 2,072,342
228,207,000 252,378,735 247,774,595 12,388,730 4,660,922 2,733,029
DP5%Asumsi Angsuran KPR/bln (Bunga 7.00%)
169,649,000 187,672,145 184,239,165 9,211,958 3,465,748 2,032,214 1,573,194 1,356,984201,404,065
229,313,185
270,795,295
266,148,318
307,530,525
313,662,900
346,491,548
Daftar Harga RumahKAWASAN BUKIT MELIA 22-Mar-19
Catatan :- Harga sudah termasuk: PPN, IMB, Listrik 1300 watt, Air PDAM, Akta Jual Beli, BBN Sertifikat HGB, Biaya
Perolehan Hak Atas Tanah dan Bangunan (BPHTB) untuk pembelian ke-1. Pembelian ke-2 dan seterusnya
atas nama yang sama, dikenakan tambahan biaya BPHTB sebesar @ Rp 3.000.000.
- Harga belum termasuk: Biaya proses KPR (bagi pembeli KPR), IPL (Iuran Perawatan Lingkungan).
- Untuk pembelian KPR berkas permohonan KPR diserahkan paling lambat 2 minggu setelah pembayaran,
Tanda Jadi. .Apabila tidak menyerahkan maka pembelian dianggap BATAL
- Ilustrasi perhitungan angsuran KPR di atas merupakan perkiraan, nilai perhitungan sebenarnya akan
dikeluarkan oleh pihak bank pemberi KPR.
- Besaran bunga KPR dapat berubah sewaktu-waktu, besaran bunga yang berlaku adalah besar bunga pada
saat penandatanganan akad kredit.
- Untuk pembelian Angsuran 12 bulan, harga sudah termasuk asuransi jiwa Ciputra Life./ 24
- Konsumen diwajibkan melampirkan NPWP Pribadi.
Cara Pembayaran Tunai :
- Tanda Jadi : Rp 2.500.000,- Hari ke-1
- Uang Muka : 20% dikurangi Tanda Jadi Hari ke-15
- Sisa : 80% Hari ke-31
Cara Pembayaran Angsuran 12 Bulan :/ 24
- Tanda Jadi : Rp 2.500.000,- Hari ke-1
- Uang Muka : 30% dikurangi Tanda Jadi Hari ke-15
- Sisa : 70% diangsur selama 12 bulan/ 24
Angsuran ke-1 mulai Hari ke-31
Cara Pembayaran :KPR
- Tanda Jadi : Rp 2.500.000,- Hari ke-1
- Uang Muka : 5% (KPR ke-1) /
15% (KPR ke-2) /
20% (KPR ke-3) dikurangi Tanda Jadi Hari ke-15
- Sisa : 95% / 85% / 80% KPR
*Harga dan ketentuan di atas dapat berubah sewaktu-waktutanpa pemberitahuan terlebih dahulu.
CitraIndahCity.Official KotaNuansaAlamCitraIndahCityOfficial
Kantor Pemasaran CitraIndah :CityJl. Raya Jonggol Km 23,2 Cileungsi Bogor 16830
Fax. (021) 8993 2023 / 2862Telp: 021-8993 0808, 8993 0606 8993
www.citraindah.com
No. Rekening a/n PT Ciputra Indah502-032-399-1 (BCA), 122-009-905-5322 (Mandiri)
30003000
4000
3000
1500
2500
3000
3000
3000
1000
0
6000
3000 1100 1900
3000 1100 1900
30003000
4000
3000
1500
2500
3000
5000
- 80
00
5000
- 80
00
1200
0 - 1
5000
6000
3000 1100 1900
30003000
4000
3000
1500
2500
3000
3000
2000
5000
1200
0
6000
3000 1100 1900
30003000
5250
3000
1500
2500
4250
3000
3750
6750
1500
0
6000
300011001900
1800 12003000
6000
5000
3000
3000
1500
2500
1500
0
800
3700
6000
4500
Melia 1LUAS BANGUNAN
LUAS TANAH
22m2 60m2
Melia 1ALUAS BANGUNAN
LUAS TANAH
22m2 72m2
Melia 1BLUAS BANGUNAN
LUAS TANAH
22m2 90m2
MELIA 2LUAS BANGUNAN
LUAS TANAH
30m2 72m2
MELIA 2ALUAS BANGUNAN
LUAS TANAH
30m2 90m2
MELIA 3LUAS BANGUNAN
LUAS TANAH
36m2 90m2
Melia 1 Melia 1a, 1b Melia 2 Melia 2a Melia 3
• PONDASI : Batu Kali• DINDING Depan : Batako (single wall), diplester & dicat• LANTAI UTAMA : Keramik 30 x 30 putih polos • Teras Tipe 1,& 2 : Keramik 20 x 20 • Teras Tipe 3G : Keramik 30 x 30• PLAFON : GRC• PINTU DEPAN : Semi Panel• PINTU DALAM : Double Triplek• DINDING KAMAR MANDI • Tipe 1 dan 2 : Cat Minyak • Tipe 3G : Keramik 20 x 20 t: 160 cm, Lantai 20 x 20
• KUSEN : Full Alumunium• PINTU & KUSEN KAMAR MANDI : PVC• ATAP • Rangka Atap : Baja Ringan • Penutup Atap : Genteng Beton• SANITASI : Shower, Closet Jongkok• LISTRIK : 1300 watt (realisasi sesuai jadwal PLN)
• AIR : PDAM Bogor (realisasi sesuai jadwal PDAM)
• SPESIFIKASI JALAN DAN SALURAN • Jalan : Finish Aspal • Saluran : U-Ditch
www.citraindah.comShare Location
BukitMelia
CitraIndahCityOfficial
KotaNuansaAlam
CitraIndahCity.Official
Fasilitas
Feeder BuswayKomdak-Blok M-Grogol
Kelapa Gading-Kuningan-Cikarang
Marketing Gallery
www.citraindah.com
U
Citraland Cibubur
Citragran Cibubur
Citra Grand CBD Cibubur
STASIUN KRL CIKARANG
Melia 122/60
Melia 1A22/72
Melia 1B22/90
Melia 230/72
Melia 2A30/90
Melia 2B30/90
Melia 3B36/90
Ruko4 x 15 | 5 x 15
Fasum/Fasos
Hijau
Legenda
Bukit
Siteplan
Spesifikasi
Semua data yang tercantum dalam brosur ini adalah berdasarkan situasi pada masa persiapan. Developer dapat mengadakan perubahan sewaktu-waktutanpa pemberitahuan terlebih dahulu dan merupakan hak penuh developer
BLOK D
E 05 RO
W 7
BLOK DE 02 ROW 8
BLOK DE 00 ROW 22
BLOK DE 00 ROW 22BLOK DE 00 ROW 22BLOK DE 00 ROW 22