ANALISA HARGA SATUAN

PEKERJAAN PERSIAPAN 1.00 m2 Pembersihan Lapangan

Upah : = Rp. 15,000 Total = Rp. 15,000 Dibulatkan = Rp. 15,000

1.00 m' Pembuatan pagar seng sementara proyek finish cat tinggi 180 cm + PondasiBahan :

1.250 bt dolken dia. 5-7cm @ Rp. 12,000 = Rp. 15,000 1.278 lbr seng @ Rp. 45,000 = Rp. 57,500 0.060 kg paku seng @ Rp. 15,000 = Rp. 900 0.400 lt residu / meni @ Rp. 19,000 = Rp. 7,600 0.350 zak PC ( @ 50 kg ) @ Rp. 67,000 = Rp. 23,450 1.800 m2 cat minyak @ Rp. 35,000 = Rp. 63,000

= Rp. 167,450 Upah : = Rp. 35,000

Total = Rp. 202,450 Dibulatkan = Rp. 203,000

1.00 Bahan :

0.815 lbr multipleks 4 mm @ Rp. 65,000 = Rp. 52,975 0.093 m3 kaso / reng borneo @ Rp. 2,300,000 = Rp. 214,130 0.010 m3 balok 8/12 borneo @ Rp. 2,800,000 = Rp. 28,000 0.500 kg paku @ Rp. 25,000 = Rp. 12,500 0.500 zak semen tigaroda @ Rp. 67,000 = Rp. 33,500 0.100 m3 pasir beton @ Rp. 225,000 = Rp. 22,500 0.050 m3 koral @ Rp. 195,000 = Rp. 9,750 0.350 lbr asbes gelombang besar @ Rp. 56,000 = Rp. 19,600

= Rp. 392,955 Upah : = Rp. 150,000

Total = Rp. 542,955 Dibulatkan = Rp. 543,000

PEKERJAAN STRUKTUR

PEKERJAAN GALIAN & URUGAN

1.00 Upah : = Rp. 75,000

Total = Rp. 75,000 Dibulatkan = Rp. 75,000

1.00 Upah : = Rp. 28,000

Total = Rp. 28,000

Pembersihan Lapangan tiap 1 m2

m2 Pembuatan kantor pelaksana & direksi ( sederhana )

m3 Galian tanah cadas

m3 Urugan kembali tanah bekas galian

Dibulatkan = Rp. 28,000

1.00 Alat : 0.025 hari sewa stemper 300,000 = Rp. 7,500 Upah : 0.025 hari Upah Tk. Stemper ( 2 orang ) 175,000 = Rp. 4,375

Total = Rp. 11,875 Dibulatkan = Rp. 11,900

1.00 Bahan 1.10 m3 pasir urug @ Rp. 175,000 = Rp. 192,500

= Rp. 192,500 Upah : = Rp. 70,000

Total = Rp. 262,500 Dibulatkan = Rp. 262,500

1.00 Upah + Bahan 1.10 m3 urugan puing @ Rp. 85,000 = Rp. 93,500

Total = Rp. 93,500 Dibulatkan = Rp. 93,500

1.00 Upah + Bahan ( padat ) 1.00 m3 urugan tanah merah @ Rp. 125,000 = Rp. 125,000

Total = Rp. 125,000 Dibulatkan = Rp. 125,000

PEKERJAAN PONDASI DAN LAIN -LAIN 1.00 Bahan : 0.27 zak PC ( @ 50 kg ) tiga roda @ Rp. 67,000 = Rp. 18,090 0.03 m3 pasir beton @ Rp. 225,000 = Rp. 6,750 0.05 m3 Split ( batu pecah ) 1/2, 2/3 @ Rp. 220,000 = Rp. 11,000

= Rp. 35,840 Upah : = Rp. 35,000

Total = Rp. 70,840 Dibulatkan = Rp. 70,900

1.00 = Rp. 1,418,000

1.00

Bahan : 0.2585 zak PC ( @ 50 kg ) @ Rp. 67,000 = Rp. 17,320 0.0429 m3 pasir beton @ Rp. 225,000 = Rp. 9,650 0.0716 m3 koral beton ( split ) @ Rp. 220,000 = Rp. 15,754 3.0000 kg Besi beton @ Rp. 15,500 = Rp. 46,500

m2 Pemadatan tanah dasar (dengan stemper)

m3 Urugan pasir dengan pasir urug padat tebal 7 cm

m3 Urugan Puing untuk peniggian peil

m3 Urugan Tanah Merah untuk tanaman

m2 Lt. Kerja / Rabat Beton ad. 1 : 3 : 5, tebal 5 cm, tanpa tulangan

m3 Lt. Kerja / Rabat Beton ad. 1 : 3 : 5, tebal 5 cm

m2 Rabat Beton adukan 1 : 3 : 5, tebal 7 cm + tul. Ø8-30, 1 lapis

E106
Besi KS Nov'97

0.0750 kg Kawat Besi beton @ Rp. 35,000 = Rp. 2,625 = Rp. 91,849

Upah : 1.0000 m2 Lantai kerja @ Rp. 58,000 = Rp. 58,000 3.0000 kg Besi beton @ Rp. 1,500 = Rp. 4,500

= Rp. 62,500 Total = Rp. 154,349 Dibulatkan = Rp. 154,400

1.00 = Rp. 2,205,714

1.00

Bahan : 22.000 bh batu bata Cikarang @ Rp. 500 = Rp. 11,000 0.175 zak PC ( @ 50 kg ) @ Rp. 67,000 = Rp. 11,725 0.035 m3 pasir pasang @ Rp. 225,000 = Rp. 7,875

= Rp. 30,600 Upah : = Rp. 25,000

Total = Rp. 55,600 Dibulatkan = Rp. 55,600

1.00

Bahan : 1.20 m3 batu belah @ Rp. 225,000 = Rp. 270,000

Upah : = Rp. 50,000 Total = Rp. 320,000 Dibulatkan = Rp. 320,000

1.00 Bahan : 1.20 m3 batu belah @ Rp. 225,000 = Rp. 270,000 2.70 zak PC ( @ 50 kg ) @ Rp. 67,000 = Rp. 180,900 0.54 m3 pasir pasang @ Rp. 225,000 = Rp. 122,400

= Rp. 573,300

Upah : = Rp. 150,000 Total = Rp. 723,300 Dibulatkan = Rp. 724,000

PEKERJAAN STRUKTUR BETON

1.00

Bahan :0.920 m3 Split 1/2, 2/3 @ Rp. 220,000 = Rp. 202,400 4.600 zak PC ( @ 50 kg ) @ Rp. 67,000 = Rp. 308,200 0.557 m3 pasir beton @ Rp. 225,000 = Rp. 125,325 0.050 m3 Weste beton @ Rp. 353,908 = Rp. 17,695

Upah :1.000 m3 Upah @ Rp. 250,000 = Rp. 250,000

m3 Rabat Beton adukan 1:3:5, tebal 7 cm + tul. Ø8-30, 1 lapis

m' Pasangan Rollag 1:5

m3 Pasangan batu kosong / Aanstamping

m3 Pasangan batu kali campuran 1:5

m3 Beton Site Mix adukan 1 :3:5 ( setara dengan K175 )

Alat :0.05 hari vibrator + operator @ Rp. 300,000 = Rp. 15,000

Total = Rp. 918,620 Dibulatkan = Rp. 919,000

1.00

Bahan :0.820 m3 Split 1/2, 2/3 @ Rp. 220,000 = Rp. 180,400 6.500 zak PC ( @ 50 kg ) @ Rp. 67,000 = Rp. 435,500 0.540 m3 pasir beton @ Rp. 225,000 = Rp. 121,500 0.050 m3 Waste Beton 5% @ Rp. 399,710 = Rp. 19,986

Upah :1.000 m3 Upah @ Rp. 250,000 = Rp. 250,000

Alat :0.05 hari vibrator + operator @ Rp. 300,000 = Rp. 15,000

Total = Rp. 1,022,386 Dibulatkan = Rp. 1,023,000

1.00 Bahan : 1.050 m3 beton ready mix K175 @ Rp. 750,000 = Rp. 787,500 0.033 hr concrete pump + operator @ Rp. 2,900,000 = Rp. 96,667 0.050 hr vibrator @ Rp. 300,000 = Rp. 15,000 Upah : = Rp. 100,000

Total = Rp. 999,167 Dibulatkan = Rp. 999,200

1.00 Bahan : 1.050 m3 beton ready mix K225 @ Rp. 850,000 = Rp. 892,500 0.033 hr concrete pump @ Rp. 2,900,000 = Rp. 96,667 0.050 hr vibrator @ Rp. 300,000 = Rp. 15,000 Upah : = Rp. 100,000

Total = Rp. 1,104,167 Dibulatkan = Rp. 1,104,200

1.00 kg Pembesian Bahan : 1.050 kg besi beton @ Rp. 15,500 = Rp. 16,275 0.021 kg kawat beton @ Rp. 35,000 = Rp. 735 Upah : 1.050 kg upah tukang besi @ Rp. 3,500 = Rp. 3,675

Total = Rp. 20,685

m3 Beton Site Mix adukan 1 :2:3 ( setara dengan K225 )

m3 Beton Readymix K175

m3 Beton Readymix K225

E199
Besi KS Nov'97

Dibulatkan = Rp. 20,700

1.00

Bahan :1.350 lbr multipleks 9 mm uk. 4"x8" rijek (pakai 2x) @ Rp. 125,000 = Rp. 168,750 0.020 m3 kaso 5/6 meranti ( pakai 2x ) @ Rp. 2,300,000 = Rp. 46,000 1.500 kg paku 5,7,10 cm @ Rp. 15,000 = Rp. 22,500

Upah : 4.500 m2 upah bekisting @ Rp. 35,000 = Rp. 157,500

Total = Rp. 394,750 Dibulatkan = Rp. 394,800

1.00 = Rp. 87,733

1.00

Bahan :0.120 m3 papan meranti ( pakai 1,5x ) @ Rp. 2,900,000 = Rp. 348,000 0.040 m3 kaso meranti ( pakai 2x) @ Rp. 2,300,000 = Rp. 92,000 1.500 kg paku 5,7,10 cm @ Rp. 15,000 = Rp. 22,500

Upah : 13.333 m2 upah bekisting sloof @ Rp. 35,000 = Rp. 466,667

Total = Rp. 929,167 Dibulatkan = Rp. 929,200

1.00 = Rp. 69,690

1.00

Bahan :0.120 m3 papan meranti (pakai 2x) @ Rp. 2,900,000 = Rp. 348,000 0.040 m3 kaso meranti (pakai 2x) @ Rp. 2,300,000 = Rp. 92,000 1.500 kg paku 5,7,10 cm @ Rp. 15,000 = Rp. 22,500

Upah : 15.385 m2 upah bekisting kolom dan balok praktis @ Rp. 50,000 = Rp. 769,231

Total = Rp. 1,231,731 Dibulatkan = Rp. 1,231,800

1.00 = Rp. 80,067

1.00

Bahan :3.040 lbr multipleks 9 mm 4'x8' Rijek @ Rp. 125,000 = Rp. 380,000 0.140 m3 kaso meranti (pakai 2x) @ Rp. 2,300,000 = Rp. 322,000 0.110 m3 balok meranti (pakai 2x) @ Rp. 2,900,000 = Rp. 319,000 1.800 kg paku 5,7,10 cm @ Rp. 15,000 = Rp. 27,000

Upah : 23.333 m2 upah bekisting kolom struktur 15/20 @ Rp. 50,000 = Rp. 1,166,667

Total = Rp. 2,214,667 Dibulatkan = Rp. 2,214,700

1.00 = Rp. 94,916

m3 Bekisting Pondasi Plat Beton Jalur / Setempat

m2 Bekisting Pondasi Plat Beton Jalur / Setempat

m3 Bekisting Sloof

m2 Bekisting Sloof

m3 Bekisting Kolom & Ring Balok Praktis

m2 Bekisting Kolom & Ring Balok Praktis

m3 Bekisting Kolom Struktur

m2 Bekisting Kolom Struktur

1.00

Bahan :2.400 lbr multipleks 9 mm 4'x8' Rijek @ Rp. 125,000 = Rp. 300,000 0.140 m3 kaso meranti (pakai 2x) @ Rp. 2,300,000 = Rp. 322,000 0.070 m3 balok meranti (pakai 2x) @ Rp. 2,900,000 = Rp. 203,000 1.800 kg paku 5,7,10 cm @ Rp. 15,000 = Rp. 27,000 1.000 ls scafolding @ Rp. 25,000 = Rp. 25,000

Upah : 16.667 m2 upah bekisting balok struktur 15/30 @ Rp. 60,000 = Rp. 1,000,000

Total = Rp. 1,877,000 Dibulatkan = Rp. 1,877,000

1.00 = Rp. 112,620

1.00

Bahan : 1.67 lbr multipleks 9 mm 4'x8' Rijek @ Rp. 125,000 = Rp. 208,750 0.14 m3 kaso meranti (pakai 2x) @ Rp. 2,300,000 = Rp. 322,000 0.07 m3 balok 5/10 meranti ( pakai 1,5x ) @ Rp. 2,900,000 = Rp. 203,000

8.000 btg dolken @ Rp. 12,000 = Rp. 96,000 1.800 kg paku 5,7,10 cm @ Rp. 15,000 = Rp. 27,000 1.000 ls scafolding @ Rp. 25,000 = Rp. 25,000

Upah : 8.333 m2 upah bekisting plat beton t.12 mm @ Rp. 35,000 = Rp. 291,667

Total = Rp. 1,173,417 Dibulatkan = Rp. 1,173,500

1.00 = Rp. 140,820

1.00

Bahan :2.610 m3 multipleks 9 mm 4'x8' Rijek @ Rp. 125,000 = Rp. 326,250 0.140 m3 kaso meranti (pakai 2x) @ Rp. 2,300,000 = Rp. 322,000 0.110 m3 balok 5/10 meranti ( pakai 1,5x ) @ Rp. 2,900,000 = Rp. 319,000 4.800 kg paku 5,7,10 cm @ Rp. 15,000 = Rp. 72,000

Upah : 12.000 m2 upah bekisting @ Rp. 75,000 = Rp. 900,000

Total = Rp. 1,939,250 Dibulatkan = Rp. 1,939,300

1.00 = Rp. 161,608

1.00

1.000 m3 Beton site mix adukan 1:2:3 = Rp. 1,023,000

m3 Bekisting Balok Struktur ( 15/20, 15/30, 15/40 )

m2 Bekisting Balok Struktur

m3 Bekisting Plat beton

m2 Bekisting Plat beton

m3 Bekisting Tangga Beton

m2 Bekisting Tangga Beton

m3 Beton Pondasi Plat Beton Jalur / Setempat Beton Site Mix adukan 1 :2:3 ( 110 kg/m3 )

110.000 kg Tulangan = Rp. 2,277,000 1.000 m3 Bekisting = Rp. 394,800

= Rp. 3,694,800

1.00

1.000 m3 Beton site mix adukan 1:3:5 = Rp. 919,000 125.000 kg Tulangan = Rp. 2,587,500

1.000 m3 Bekisting = Rp. 929,200 = Rp. 4,435,700

1.00

1.000 m3 Beton site mix adukan 1:3:5 = Rp. 919,000 145.000 kg Tulangan = Rp. 3,001,500

1.000 m3 Bekisting = Rp. 1,231,800 = Rp. 5,152,300

1.00

1.000 m3 Beton site mix adukan 1:2:3 = Rp. 1,023,000 195.000 kg Tulangan = Rp. 4,036,500

1.000 m3 Bekisting = Rp. 2,214,700 = Rp. 7,274,200

1.00

1.000 m3 Beton site mix adukan 1:2:3 = Rp. 1,023,000 190.000 kg Tulangan = Rp. 3,933,000

1.000 m3 Bekisting = Rp. 2,214,700 = Rp. 7,170,700

1.00

1.000 m3 Beton readymix K225 = Rp. 1,104,200 190.000 kg Tulangan = Rp. 3,933,000

1.000 m3 Bekisting = Rp. 2,214,700 = Rp. 7,251,900

1.00

1.000 m3 Beton site mix adukan 1:2:3 = Rp. 1,023,000 145.000 kg Tulangan = Rp. 3,001,500

1.000 m3 Bekisting = Rp. 1,877,000 = Rp. 5,901,500

1.00

1.000 m3 Beton readymix K225 = Rp. 1,104,200 145.000 kg Tulangan = Rp. 3,001,500

1.000 m3 Bekisting = Rp. 1,877,000 = Rp. 5,982,700

m3 Sloof Beton 15/20 Site Mix adukan 1:3:5 ( 4f10 +f6-100, 125 kg/m3 )

m3 Kolom Praktis Beton 13/13 Site Mix adukan 1:3:5 ( 4f8 + f8-150, 145 kg/m3 )

m3 Kolom Beton Struktur 13/20 Site Mix adukan 1:2:3 ( 4f 13 + f6-150, 195 kg/m3 )

m3 Kolom Beton Struktur 15/30 Site Mix adukan 1:2: 3 ( 6f 13 + f8-150, 190 kg/m3 )

m3 Kolom Beton Struktur 15/30 ReadyMix K225 ( 6f 13 + f8-150, 190 kg/m3 )

m3 Balok Beton Struktur 15/30 Site Mix adukan 1:2:3 ( 4f 13 + f8-150, 145 kg/m3 )

m3 Balok Beton Struktur 15/30 Ready Mix K225 ( 4f 13 + f8-150, 145 kg/m3 )

1.00

1.000 m3 Beton site mix adukan 1:2:3 = Rp. 1,023,000 161.000 kg Tulangan = Rp. 3,332,700

1.000 m3 Bekisting = Rp. 1,877,000 = Rp. 6,232,700

1.00

1.000 m3 Beton readymix K225 = Rp. 1,104,200 161.000 kg Tulangan = Rp. 3,332,700

1.000 m3 Bekisting = Rp. 1,877,000 = Rp. 6,313,900

1.00

1.000 m3 Beton site mix adukan 1:3:5 = Rp. 919,000 192.000 kg Tulangan = Rp. 3,974,400

1.000 m3 Bekisting = Rp. 1,231,800 = Rp. 6,125,200

1.00

1.000 m3 Beton site mix adukan 1:2:3 = Rp. 1,023,000 92.000 kg Tulangan = Rp. 1,904,400

1.000 m3 Bekisting = Rp. 1,173,500 = Rp. 4,100,900

1.00

1.000 m3 Beton Readymix K225 = Rp. 1,104,200 92.000 kg Tulangan = Rp. 1,904,400

1.000 m3 Bekisting = Rp. 1,173,500 = Rp. 4,182,100

1.00

1.000 m3 Beton site mix adukan 1:2:3 = Rp. 1,023,000 83.000 kg Tulangan = Rp. 1,718,100

1.000 m3 Bekisting = Rp. 1,173,500 = Rp. 3,914,600

1.00

1.000 m3 Beton Readymix K225 = Rp. 1,104,200 83.000 kg Tulangan = Rp. 1,718,100

1.000 m3 Bekisting = Rp. 1,173,500 = Rp. 3,995,800

1.00

1.000 m3 Beton site mix adukan 1:2:3 = Rp. 1,023,000 125.000 kg Tulangan = Rp. 2,587,500

1.000 m3 Bekisting = Rp. 1,939,300 = Rp. 5,549,800

m3 Balok Beton Struktur 15/25 Site Mix adukan 1:2:3 ( 4f 13 + f8-150, 161 kg/m3 )

m3 Balok Beton Struktur 15/25 Ready Mix K225 ( 4f 13 + f8-150, 161 kg/m3 )

m3 RingBalk Beton Struktur 15/20 Site Mix adukan 1:3:5 ( 4f 13 + f8-150, 192 kg/m3 )

m3 Plat Beton t. 12 cm Site Mix adukan 1:2:3 ( f8-150 +f8-150, 92 kg/m3 )

m3 Plat Beton t. 12 cm ReadyMix K225 ( f8-150 +f8-150, 92 kg/m3 )

m3 Dak Beton t. 10 cm Site Mix adukan 1:2:3 ( f8-200 +f8-200, 83 kg/m3 )

m3 Dak Beton t. 10 cm Ready Mix K225 ( f8-200 +f8-200, 83 kg/m3 )

m3 Tangga Beton Site Mix adukan 1:2:3 ( 125 kg/m3 )

1.00

1.000 m3 Beton ready mix adukan K225 = Rp. 1,104,200 125.000 kg Tulangan = Rp. 2,587,500

1.000 m3 Bekisting = Rp. 1,939,300 = Rp. 5,631,000

PEKERJAAN WATERPROOFING

1.00 Bahan + upah : 1.00 m2 waterproofing coating @ Rp. 125,000 = Rp. 125,000

Total = Rp. 125,000 Dibulatkan = Rp. 125,000

1.00 Bahan + upah : 1.00 m2 waterproofing membrane @ Rp. 225,000 = Rp. 225,000

Total = Rp. 225,000 Dibulatkan = Rp. 225,000

PASANGAN BATU BATA

1.00 Bahan : 85.00 bh batu bata Cikarang @ Rp. 550 = Rp. 46,750 0.215 zak PC ( @ 50 kg ) @ Rp. 57,000 = Rp. 12,255 0.043 m3 pasir pasang @ Rp. 225,000 = Rp. 9,675

= Rp. 68,680 Upah : = Rp. 35,000

Total = Rp. 103,680 Dibulatkan = Rp. 103,700

1.00 Bahan : 0.105 m3 Bata celcon @ Rp. 1,100,000 = Rp. 115,500 3.15 kg Mortar khusus ( @ 40 kg ) MU-380 @ Rp. 4,200 = Rp. 13,230

Harga/m2 = Rp. 128,730 Upah : = Rp. 25,000

Total = Rp. 153,730 Dibulatkan = Rp. 153,800

1.00 Bahan : 15.000 bh Bataco @ Rp. 5,000 = Rp. 75,000 0.310 zak PC ( @ 50 kg ) @ Rp. 57,000 = Rp. 17,670 0.043 m3 pasir pasang @ Rp. 225,000 = Rp. 9,675

Harga/m2 = Rp. 102,345 Upah : = Rp. 26,000

Total = Rp. 128,345 Dibulatkan = Rp. 129,000

m3 Tangga Beton Ready Mix K225 ( 125 kg/m3 )

m2 Waterproofing type Coating

m2 Waterproofing type Membrane

m2 Pasangan batu bata 1/2 campuran 1:5 ( bata merah biasa 180x90x40 )

m2 Pasangan batu celcon tebal 10 cm spesie khusus

m2 Pasangan batu bataco

1.00 Bahan : 1.15 m2 batu alam susun sirih @ Rp. 250,000 = Rp. 287,500 0.35 zak PC ( @ 50 kg ) @ Rp. 57,000 = Rp. 19,950 0.05 m3 pasir pasang @ Rp. 225,000 = Rp. 11,250

= Rp. 318,700 Upah : = Rp. 75,000

Total = Rp. 393,700 Dibulatkan = Rp. 393,700

1.00 Bahan : 1.15 m2 batu alam palimanan jogja @ Rp. 225,000 = Rp. 258,750 0.35 zak PC ( @ 50 kg ) @ Rp. 57,000 = Rp. 19,950 0.05 m3 pasir pasang @ Rp. 225,000 = Rp. 11,250

= Rp. 289,950 Upah : = Rp. 75,000

Total = Rp. 364,950 Dibulatkan = Rp. 365,000

PLESTERAN & ACIAN

1.00 Bahan : 0.173 zak PC ( @ 50 kg ) @ Rp. 57,000 = Rp. 9,880 0.030 m3 pasir pasang @ Rp. 225,000 = Rp. 6,750

= Rp. 16,630 Upah : = Rp. 25,000

Total = Rp. 41,630 Dibulatkan = Rp. 41,700

1.00 Bahan :

0.270 zak PC ( @ 50 kg ) @ Rp. 57,000 = Rp. 15,390 0.027 m3 pasir pasang @ Rp. 225,000 = Rp. 6,075

= Rp. 21,465 Upah : = Rp. 25,000

Total = Rp. 46,465 Dibulatkan = Rp. 46,500

1.00 Bahan : 0.112 zak PC ( @ 50 kg ) @ Rp. 57,000 = Rp. 6,384 Upah : = Rp. 15,000

Total = Rp. 21,384 Dibulatkan = Rp. 21,400

1.00 = Rp. 63,100

1.00 = Rp. 67,900

m2 Pasangan batu alam susun sirih

m2 Pasangan batu alam Palimanan

m2 Plesteran tebal 20 mm campuran 1:5

m2 Plesteran tebal 20 mm campuran 1:3

m2 Acian

m2 Plesteran tebal 20 mm campuran 1:5 + Acian

m2 Plesteran tebal 20 mm campuran 1:3 + Acian

1.00 Bahan :

0.100 zak PC ( @ 50 kg ) @ Rp. 57,000 = Rp. 5,700 0.020 m3 pasir pasang @ Rp. 225,000 = Rp. 4,500

= Rp. 10,200 Upah : = Rp. 25,000

Total = Rp. 35,200 Dibulatkan = Rp. 35,200

1.00 m' Dinding profil, t.5 cmBahan :

0.433 zak PC ( @ 50 kg ) @ Rp. 57,000 = Rp. 24,700 0.057 m3 pasir pasang @ Rp. 225,000 = Rp. 12,750

= Rp. 37,450 Upah : = Rp. 35,000

Total = Rp. 72,450 Dibulatkan = Rp. 72,500

1.00 m' Ban plester beton t.15 cmBahan : 0.650 zak PC ( @ 50 kg ) @ Rp. 57,000 = Rp. 37,050 0.085 m3 pasir pasang @ Rp. 225,000 = Rp. 19,125

= Rp. 56,175 Upah : = Rp. 30,000

Total = Rp. 86,175 Dibulatkan = Rp. 86,200

PEKERJAAN ATAP

1.00 Bahan : 20.00 bh genteng good year @ Rp. 5,000 = Rp. 100,000

= Rp. 100,000 Upah : = Rp. 25,000

Total = Rp. 125,000 Dibulatkan = Rp. 125,000

1.00 m' Pemasangan Lisplank KayuBahan : 1.00 m' papan lisplank @ Rp. 75,000 = Rp. 75,000 0.10 kg paku @ Rp. 15,000 = Rp. 1,500

= Rp. 76,500 Upah : = Rp. 50,000

Total = Rp. 126,500 Dibulatkan = Rp. 127,000

PEKERJAAN ARSITEKTUR

m2 Plesteran dak beton expose tebal 20 mm campuran 1:3

m2 Atap genteng good year karang pilang

PEKERJAAN FINISHING LANTAI

1.00 Bahan :

1.080 dus Homogenous tile 60x60 cm @ Rp. 195,000 = Rp. 210,600 0.266 zak PC @ Rp. 57,000 = Rp. 15,162 0.053 m3 pasir pasang @ Rp. 225,000 = Rp. 11,925 0.250 kg semen warna @ Rp. 15,000 = Rp. 3,750

= Rp. 241,437 Upah : = Rp. 50,000

Total = Rp. 291,437 Dibulatkan = Rp. 291,500

1.00 Bahan : 1.05 dus ubin Keramik 30x30 cm @ Rp. 95,000 = Rp. 99,750

0.266 zak PC @ Rp. 57,000 = Rp. 15,162 0.053 m3 pasir pasang @ Rp. 225,000 = Rp. 11,925 0.250 kg semen grouting @ Rp. 15,000 = Rp. 3,750

= Rp. 130,587 Upah : = Rp. 35,000

Total = Rp. 165,587 Dibulatkan = Rp. 166,000

1.00 Bahan : 0.96 dus Keramik Indogress 30x30 cm @ Rp. 155,000 = Rp. 148,800

0.266 zak PC @ Rp. 57,000 = Rp. 15,162 0.053 m3 pasir pasang @ Rp. 225,000 = Rp. 11,925 0.250 kg semen grouting @ Rp. 15,000 = Rp. 3,750

= Rp. 179,637

Upah : = Rp. 50,000 Total = Rp. 229,637 Dibulatkan = Rp. 229,700

1.00 Bahan :

0.972 m2 keramik 50x50 @ Rp. 118,000 = Rp. 114,722 0.300 Zak PC @ Rp. 57,000 = Rp. 17,100 0.040 m3 pasir pasang @ Rp. 225,000 = Rp. 9,000 0.250 kg semen grouting @ Rp. 15,000 = Rp. 3,750

= Rp. 144,572 Upah : = Rp. 45,000

Total = Rp. 189,572 Dibulatkan = Rp. 190,000

Jakarta, 1 Desember 2014

m2 Pasangan Lantai Keramik 60x60 cm ex Indogress

m2 Pasangan Lantai Keramik 30x30 cm

m2 Pasangan Dinding Keramik 30x30 cm Indogress

m2 Pasangan Lantai keramik 40x40 cm

PT. ARGAS DILAGA

Sayuti MoekriDirektur Utama

RUMUS PERHITUNGAN STRUKTURDIVISI QS

No. URAIAN PEKERJAANVolume

RUMUS a b c

PEKERJAAN PONDASI1 PONDASI BATU KALI

a

- Type 1 0.40 0.70 h - Type 2 0.20 0.50

- Type 3 0.00 0.00 Jumlah

b

2 PONDASI PLAT SETEMPATBeton ( a*b*0,2+ c*d*h) x Jml titik

- Type P1 1.20 1.20 0.30 - Type P2 1.00 1.00 0.15

h - Type P3 0.80 0.80 0.15 - Type P4 1.00 1.30 0.15 - Type P5 0.90 0.90 0.15 - Type P6 0.70 0.70 0.15

Jumlah 20 cm

a Bekisting (2*(a+b)*0,2+2*( c+d)*h) x Jml titik - Type P1 - Type P2- Type P3- Type P4- Type P5

d - Type P6b Jumlah

c Tulanganpjg tul jarak tul byk tul

- Type P1 Tulangan Plat atas dia. 12 3.10 0.15 16.00

Tulangan Plat bawah dia. 13 3.10 0.15 16.00 Tulangan utama Kolom dia. 16 1.80 6.00

Tulangan sengkang Kolom dia. 8 1.25 0.15 10.00 Jumlah

- Type P2 pjg tul jarak tul byk tulTulangan Plat atas dia. 12 2.70 0.15 13.33

Tulangan Plat bawah dia. 13 2.70 0.15 13.33 Tulangan utama Kolom dia. 13 2.60 6.00

Tulangan sengkang Kolom dia. 8 1.15 0.15 15.33 Jumlah

- Type P3 pjg tul jarak tul byk tulTulangan Plat atas dia. 10 2.30 0.15 10.67

Tulangan Plat bawah dia. 12 2.30 0.15 10.67 Tulangan utama Kolom dia. 13 2.60 8.00

1/2 h x ( a + b ) x L

Tulangan sengkang Kolom dia. 8 1.05 0.15 15.33 Jumlah

- Type P4 pjg tul jarak tul byk tulTulangan Plat atas dia. 10 3.00 0.15 15.33

Tulangan Plat bawah dia. 12 2.30 0.15 15.33 Tulangan utama Kolom dia. 13 2.60 4.00

Tulangan sengkang Kolom dia. 8 0.95 0.15 15.33 Jumlah

- Type P5 pjg tul jarak tul byk tuldia. 10 2.50 0.20 9.00 dia. 12 2.50 0.20 9.00 dia. 13 2.60 4.00

dia. 8 1.05 0.20 11.50 Jumlah

- Type P6 pjg tul jarak tul byk tuldia. 10 2.10 0.20 7.00 dia. 12 2.10 0.20 0.00 dia.12 2.40 4.00 dia. 8 0.85 0.20 10.50

Jumlah

Total+ Waste 5%

3 GALIAN PONDASI Galian Pondasi Batu Kali a' b'

a' = b + 20 cm- Type 1 0.90 0.80 - Type 2 0.70 0.60

h - Type 3 0.20 0.10 Jumlah

b' = b + 10 cm

Galian Pondasi Plat Setempat a'

a' b'a x b x h x Jumlah

h = kedalaman - Type P1 1.40 1.40 - Type P2 1.20 1.20 - Type P3 1.00 1.00 - Type P4 1.20 1.50 - Type P5 1.10 1.10 - Type P6 0.90 0.90

Jumlah

b' = panjang

1/2 x h' x ( a' + b' ) x L

4 PASANGAN BATU KOSONG, TEBAL15 CM b' x L x 0,2 b' Tidak pakai 15 cm - Type 1 0.80

- Type 2 0.60 b' = b + 10 cm - Type 3 0.10

Jumlah

2 PASIR URUG BAWAH PONDASI BATU KALI, TEBAL 7 CMb' x L x 0,07

- Type 1 0.80 7 cm - Type 2 0.60

- Type 3 0.10 b' = b + 10 cm Jumlah

Pasir Urug di bawah Pondasi Plat Setempat a x b x 0,1 x Jumlah a' b'- Type P1 1.40 1.40 - Type P2 1.20 1.20 - Type P3 1.00 1.00 - Type P4 1.20 1.50 - Type P5 1.10 1.10 - Type P6 0.90 0.90

Jumlahtebal

Pasir Urug di bawah rabat beton lantai dasar Luas lantai dasar x tebal 0.07 panjang

Pasir Urug di bawah sloof Panjang sloof x lebar sloof x tebal urugan 0.05 104.00

3 RABAT BETON DI BAWAH FINISHING LANTAI Luas lantai dasar x tebal 0.07

4 LANTAI KERJA DI BAWAH PONDASI PLAT SETEMPAT, t. 5 cma' b'

a x b x 0,05 x Jumlah5 cm - Type P1 1.40 1.40

a' - Type P2 1.20 1.20 a' - Type P3 1.00 1.00 a' - Type P4 1.20 1.50

- Type P5 1.10 1.10 - Type P6 0.90 0.90

b' Jumlah

panjangLantai kerja di bawah sloof Panjang sloof x lebar sloof x tebal urugan 0.05 104.00

5 URUGAN TANAH KEMBALI BEKAS GALIANPondasi Batu Kali = Vol. Galian - ( Vol. Pondasi + Bt. kosong + Psr. Urug )Pondasi Plat Setempat = Vol. Galian - ( Vol. Pondasi + Psr. Urug + Lt. Kerja )

Jumlah

6 BUANG TANAH BEKAS GALIAN = Vol. Galian - Vol. UruganPondasi Batu KaliPondasi Plat Setempat

Jumlah

7 SLOOF a a x b x L- Beton - Type 1a 0.20 0.40

b - Type 1b 0.15 0.35 - Type 2 0.15 0.30 - Type 3 0.15 0.30 - Type 4 (pagar) 0.15 0.25 - Type 5 0.15 0.30 - Type 6 0.15 0.20

Jumlah- Bekisting 2 x b x L

- Type 1a- Type 1b- Type 2- Type 3- Type 4 (pagar)- Type 5- Type 6

Jumlah

- Tulangan - Type 1a pjg/ring jarak tul byk tulTulangan utama dia. 13 6.00

Tulangan sengkang dia. 8 1.20 0.15 693.33 Jumlah

- Type 1b pjg/ring jarak tul byk tulTulangan utama dia. 13 4.00

Tulangan sengkang dia. 8 1.00 0.15 0.00 Jumlah

Total+ Waste 5%

pjg lebar luas8 Peninggian tanah sesuai peil rencana - area 1 0.00 0.00 335.00

- area 2 0.00 0.00 0.00 - area 3 0.00 0.00 0.00

Jumlah

PEKERJAAN STRUKTUR BETON LANTAI DASAR pjg lebar1 PEMADATAN LANTAI DASAR - area 1 0.00 0.00

- area 2 0.00 0.00 - area 3 0.00 0.00 - area 4 0.00 0.00

Jumlah

2 RABAT BETON, t. 5 cm Luas lantai dasar x tebal- area 1 0.00 0.00 - area 2 0.00 0.00 - area 3 0.00 0.00 - area 3 0.00 0.00

Jumlah

1 KOLOM STRUKTUR a x b x h x byk klm pjg lebar- Beton a - Type K1 0.30 0.30

- Type K2 0.25 0.25

- Type KP1 0.15 0.15 b - Type KP2 0.10 0.10

- Type KP3 0.10 0.10 Jumlah

- Bekisting 2 (a+b) x h x byk klm- Type K1- Type K2- Type KP1- Type KP2- Type KP3

Jumlah- Tulangan

- Type K1 pjg/ring jarak tul byk tulTulangan utama dia. 16 4.00

Tulangan tengah dia. 16 2.00 Tulangan sengkang dia. 8 1.20 0.15 24.00

Jumlah

- Type K2 pjg/ring jarak tul byk tulTulangan utama dia. 16 4.00

Tulangan tengah dia. 16 4.00 Tulangan sengkang dia. 8 1.00 0.15 24.00

Jumlah

- Type KP1 pjg/ring jarak tul byk tulTulangan utama dia. 10 4.00

Tulangan sengkang dia. 8 0.60 0.15 24.00 Jumlah

- Type KP2 pjg/ring jarak tul byk tulTulangan utama dia. 10 4.00

Tulangan sengkang dia. 8 0.40 0.15 20.00 Jumlah

- Type KP3 pjg/ring jarak tul byk tulTulangan utama dia. 10 4.00

Tulangan sengkang dia. 8 0.40 0.20 10.00 Jumlah

Total+ Waste 5%

2 BALOK Plat dak / RINGBALKa x b x L

- Beton - Type RB1 0.20 0.40 14 - Type RB2 0.15 0.15

- Type RB3 0.12 0.12 20 Jumlah

- Bekisting 2 x b x L- Type RB1 & RB2- Type RB2- Type RB3

Jumlah

- Tulangan Tulangan utama - Type RB1 pjg/ring jarak tul byk tulTulangan sengkang dia. 12 4.00

dia. 8 1.20 0.20 520.00 Jumlah

Tulangan utama - Type RB2 pjg/ring jarak tul byk tulTulangan sengkang dia. 12 4.00

dia. 8 0.60 0.25 75.43 Jumlah

Tulangan utama - Type RB3 pjg/ring jarak tul byk tulTulangan sengkang dia. 12 4.00

dia. 8 0.48 0.25 172.00 Jumlah

Total+ Waste 5%

3 PLAT BETON, t. 12 cm

- Beton a pjg lebar luasa x b x 0,12

a - Luas 1 13.00 4.00 52.00 - Luas 2 13.00 4.00 52.00 - Luas 3 13.00 4.00 52.00 - Luas 4 13.00 4.00 52.00

b - Luas 3 0.00 0.00 0.00 - Luas 4 0.00 0.00 0.00

Jumlah 208.00

- Bekisting Total Luas + pjg kelilingx0,15416.00

Jumlah

- Tulangan berat/kg jml lapis jarak tul

berat jenis tul x jml lapisanjarak tul x tebal plat

dia. 10 0.395 kg/m Tulangan atas 0.62 2.00 0.20 dia. 10 0.395 kg/m Tulangan bawah 0.62 2.00 0.20

berat tulangan/m3Waste 5%

jumlah berat tulangan/m3

Total berat = total volume beton x berat tulangan/m3

3 PEKERJAAN WATERPROOFINGLuas = pjg x lebar+2*0,2*(pjg+lbr) pjg

1 Waterproofing lantai Toilet Lt. Atas - Luas toilet 1 1.50 - Luas toilet 2 0.00

Jumlah

2 Waterproofing kanopi - Luas kanopy 0.00 - Luas ? 0.00

- Luas ? 0.00 Jumlah

3 Waterproofing dak atap - Luas keseluruhan 0.00 - Luas ? 0.00 - Luas ? 0.00

Jumlah

4 Waterproofing nok genteng

5 Waterproofing dinding samping & belakang - Luas Samping Kanan 0.00 - Luas Belakang 0.00

Jumlah

6 Screed pelindng waterproofing dak beton tebal 3 cm

PEKERJAAN DINDINGLANTAI DASAR

1 Pasangan bata trassram- setinggi 20 cm pada dinding biasa Pjg x 0.2- setinggi 80 cm pada dinding toilet Pjg x 0.8

Jumlah

2 Pasangan bata biasa 1/2 batu tinggi x pjg - Vol. pintu & jendela- Panjang Keseluruhan- Luas 1 ( atas kusen )- Luas 2 ( pagar samping canopy )- Luas 3 ( pagar taman belakang)- Luas 4 ( carport belakang )- Luas 5 ( security )

Jumlah 1

Vol pintu & jendela- Pintu km/wc

r. lainpintu double

- Jendela

- TrassramJumlah 2

Luas Total = Jumlah 1 - Jumlah 2

3 Plesteran + acian trassram Luas trassram x 24 Plesteran + acian bata biasa Luas bata biasa x 25 Opening pintu & jendela/balok lintel

- Pintu km/wcr. lainpintu doublepintu taman

- Jendela

PEKERJAAN KUSEN PINTU & JENDELA1 Kusen pintu dan jendela lantai dasar

- Kusen Pintu ( Pjg + 0,1x2 ) x 0,06x0,12- Type P1 ( pintu double )- Type P2a ( r.tidur )- Type P2b ( kost )- Type P3 ( area service )- Type P4 ( km/wc )- Type P5 ( Taman )

Jumlah 1

- Kusen Jendela ( Pjg + 0,1x4 ) x 0,06x0,12- Type J1- Type J2- Type J3- Type J4- Type J5

Jumlah 2

Volume Total = Jumlah 1 + Jumlah 2

2 Kusen pintu dan jendela lantai atas - Kusen Pintu ( Pjg + 0,1x2 ) x 0,06x0,12

- Type P1 ( pintu double )- Type P2a ( r.tidur )- Type P2b ( kost )- Type P3 ( area service )- Type P4 ( km/wc )

Jumlah 1

- Kusen Jendela ( Pjg + 0,1x4 ) x 0,06x0,15- Type J3- Type J5- Type J6- Type J7

Jumlah 2

Volume Total = Jumlah 1 + Jumlah 2

PEKERJAAN ATAP Luas atap datar ( m2 ) pjg lbr1 Luas Atap

- Luas 1 16.00 8.00 - Luas 2 0.00 0.00 - Luas 3 0.00 0.00 - Luas 4 0.00 0.00 - Luas 5 0.00 0.00

Jumlah

Cosinus sudut atap ( Cos a )

balok 8/15balok 8/15balok 8/15balok 8/16balok 8/16

balok 8/18 + 10/18balok 8/18 + 10/18

bentang jmlGording 8/12, jarak @ 150 cm 0.00 1.00

PEKERJAAN PLAFONDLantai Dasar Luas = pjg x lebar pjg lbr

1 Plafond gypsum + rangka - Luas 1 R. Praktek 0.00 0.00 - Luas 2 Teras depan 0.00 0.00 - Luas 3 Tangga 0.00 0.00

Jumlah

2 Plafond calsiboard + rangka ( Teras & Toilet ) Luas = pjg x lebar pjg lbr- Luas 0.00 0.00 - Luas 0.00 0.00 - Luas 0.00 0.00 - Luas 0.00 0.00

Jumlah

3 Drop ceiling Pjg Keliling = 2x( pjg + lebar ) pjg lbr- Panjang 1 0.00 0.00 - Panjang 2 0.00 0.00 - Panjang 3 0.00 0.00

Jumlah

4 List profil plafond Pjg Keliling = 2x( pjg + lebar ) pjg lbr- Panjang 1 - R. Makan & Keluarga 0.00 0.00 - Panjang 2 - Teras depan 0.00 0.00

0.00 0.00 - Panjang 3 -Toilet 0.00 0.00 - Panjang 4 -Dapur 0.00 0.00

Jumlah

Luas = pjg x lebar pjg lbr5 Plafond beton exposed - Luas Garasi & T. Tidur 0.00 0.00

- Toilet 0.00 0.00 0.00 0.00

Jumlah

Lantai Atas Luas = pjg x lebar pjg lbr1 Plafond gypsum + rangka - Luas 1 0.00 0.00

- Luas 2 void 0.00 0.00

Jumlah

2 Plafond calsiboard + rangka ( Teras & Toilet ) Luas = pjg x lebar pjg lbr- Luas 1 - Toilet 0.00 0.00 - Luas 2 - Teras depan 0.00 0.00 - Luas 3 - Teras belakang 0.00 0.00

Kuda-kuda bentang 4 m, a 350 dan 450

Kuda-kuda bentang 5 m, a 350 dan 450

Kuda-kuda bentang 6 m, a 350 dan 450

Kuda-kuda bentang 8 m, a 350 dan 450

Kuda-kuda bentang 10 m, a 350 dan 450

Kuda-kuda bentang 12 m, a 350

Kuda-kuda bentang 14 m, a 350

- Luas 4 0.00 0.00 Jumlah

3 Drop ceiling Pjg Keliling = 2x( pjg + lebar ) pjg lbr- Panjang 1 - R. Tangga 0.00 0.00 - Panjang 2 - R. Tidur 1 0.00 0.00 - Panjang 3 - R. Tidur utama 0.00 0.00 - Panjang 4 - R. Makan 0.00 0.00

Jumlah

4 List profil plafond Pjg Keliling = 2x( pjg + lebar ) pjg lbr- Panjang 1 - R. Tidur 1 0.00 0.00 - Panjang 2 - R. Tidur utama 0.00 0.00 - Panjang 3 - Toilet 0.00 0.00 - Panjang 4 - R. Tangga 0.00 0.00 - Panjang 5 - R. Tidur 2 0.00 0.00 - Panjang 6 - Balkon 0.00 0.00

Jumlah

PEKERJAAN PLUMBING1 Pipa air kotor padat dia. 4"

- Lt. Dasar 40.00 - Lt. Atas 7.50 - Pipa turun 20.00

2 Pipa air bekas/ hujan ( saluran ) dia. 4" 20.00 3 Pipa air bekas buangan dia. 3"

- Lt. Dasar 60.20 - Lt. Atas 18.85 - Pipa turun 20.00

4 Pipa air bekas buangan dia. 6" 0.00

5 Pipa air hujan dia. 3"- Lt. Atas 17.50 - pipa turun 30.00

6 Pipa air hujan dia. 6" 0.00

7 Pipa air bersih dia. 1"- Lt. Dasar 69.00 - Lt Atas 40.50 - Taman 15.00 - pipa turun 21.00

8 Pipa air bersih dia. 3/4"- pipa naik ke kran 69.00

MENENTUKAN KAPASITAS AC ( pk )

Panjang x lebar Ruang x 500 r. tidur utama9000 r. santai tidur utama

bed room lt.1bed room bari lt.1

bed room 1, lt.2bed room 2, lt.2

Asuransi jamsostek = 0.2/1000 x nilai kontrak

Form No. 002/QS Berat Besi

dia. 8 0.395 kg/mdia. 10 0.617 kg/m

Volume Satuan

dia. 12 0.892 kg/md h L ( Pjg ) HASIL dia. 13 1.040 kg/m

dia. 16 1.583 kg/m

dia. 19 2.233 kg/m

0.70 52.00 20.02 m30.50 68.00 11.90 m30.00 0.00 0.00 m3

31.92 m3

Jml titik

0.30 1.50 16.00 6.77 m30.40 2.30 0.00 0.00 m30.35 2.30 0.00 0.00 m30.30 2.30 0.00 0.00 m30.35 2.30 0.00 0.00 m30.25 2.10 0.00 0.00 m3

16.00 6.77 m3

44.16 m20.00 m20.00 m20.00 m20.00 m20.00 m2

44.16 m2

Berat Besiberat/kg Jml titik dia. 8 0.395 kg/m

dia. 10 0.617 kg/m di pending0.89 16.00 707.63 kg dia. 12 0.892 kg/m 58.96888891.04 16.00 825.34 kg dia. 13 1.040 kg/m 68.77866671.58 1.50 16.00 273.60 kg dia. 16 1.583 kg/m 22.80.40 1.50 16.00 79.00 kg dia. 19 2.233 kg/m 6.58333333

1,885.57 kg

berat/kg Jml titik0.89 0.00 0.00 kg1.04 0.00 0.00 kg1.04 2.30 0.00 0.00 kg0.40 2.30 0.00 0.00 kg

0.00 kg

berat/kg Jml titik0.62 0.00 0.00 kg0.89 0.00 0.00 kg0.89 2.30 0.00 0.00 kg

0.40 2.30 0.00 0.00 kg0.00 kg

berat/kg Jml titik0.62 0.00 0.00 kg0.89 0.00 0.00 kg0.89 2.30 0.00 0.00 kg0.40 2.30 0.00 0.00 kg

0.00 kg

berat/kg Jml titik0.62 0.00 0.00 kg0.89 0.00 0.00 kg0.89 2.30 0.00 0.00 kg0.40 2.30 0.00 0.00 kg

0.00 kg

berat/kg Jml titik0.62 0.00 0.00 kg0.89 0.00 0.00 kg0.89 2.10 0.00 0.00 kg0.40 2.10 0.00 0.00 kg

0.00 kg

1,885.57 kg1,979.85 kg

0.90 52.00 39.78 m30.70 68.00 30.94 m30.00 0.00 0.00 m3

70.72 m3

Jml titik

1.85 16.00 58.02 m32.65 0.00 0.00 m32.65 0.00 0.00 m32.65 0.00 0.00 m32.65 0.00 0.00 m32.45 0.00 0.00 m3

58.02 m3

Tidak pakai0.15 52.00 6.24 m30.15 68.00 6.12 m30.15 0.00 0.00 m3

12.36 m3

0.07 52.00 2.91 m30.07 68.00 2.86 m30.07 0.00 0.00 m3

5.77 m3

0.07 16.00 2.20 m30.07 0.00 0.00 m30.07 0.00 0.00 m30.07 0.00 0.00 m30.07 0.00 0.00 m30.07 0.00 0.00 m3

2.20 m3Luas256.00 17.92 m3

lebar0.30 31.20 1.56 m3

256.00 17.92 m3

0.05 16.00 1.57 m30.05 0.00 0.00 m30.05 0.00 0.00 m30.05 0.00 0.00 m30.05 0.00 0.00 m30.05 0.00 0.00 m3

1.57 m3

lebar0.30 31.20 1.56 m3

20.67 m347.48 m368.16 m3

0.00 m30.00 m30.00 m3

1.00 104.00 8.32 m31.00 0.00 0.00 m31.00 0.00 0.00 m31.00 0.00 0.00 m31.00 0.00 0.00 m31.00 0.00 0.00 m31.00 0.00 0.00 m3

104.00 8.32 m3

83.20 m20.00 m20.00 m20.00 m20.00 m20.00 m20.00 m2

83.20 m2

berat/kg pjg total Berat Besi1.04 104.00 648.96 kg dia. 8 0.395 kg/m 54.080.40 328.64 kg dia. 10 0.617 kg/m 27.3866667

977.60 kg dia. 12 0.892 kg/mdia. 13 1.040 kg/m

berat/kg pjg total dia. 16 1.583 kg/m1.04 0.00 0.00 kg dia. 19 2.233 kg/m0.40 0.00 kg

0.00 kg

977.60 kg1,026.48 kg 123.375

tinggi Volume0.00 0.00 m30.00 0.00 m30.00 0.00 m3

0.00 m3

luas0.00 m20.00 m20.00 m20.00 m20.00 m2

tebal0.05 0.00 m30.05 0.00 m30.05 0.00 m30.05 0.00 m3

0.00 m3

tinggi byk klm Berat Besi3.60 16.00 5.18 m3 dia. 8 0.395 kg/m 30.43.60 2.00 0.45 m3 dia. 8 0.395 kg/m #VALUE!

3.60 12.00 0.97 m3 dia. 10 0.617 kg/m 15.1683.00 0.00 0.00 m3 dia. 13 1.040 kg/m2.00 0.00 0.00 m3 dia. 16 1.583 kg/m

6.61 m3 dia. 19 2.233 kg/m

69.12 m27.20 m2

12.96 m20.00 m20.00 m2

89.28 m2

berat/kg tinggi byk klm1.58 3.60 16.00 364.80 kg1.58 3.60 16.00 182.40 kg0.40 182.02 kg

729.22 kg 140.666667

berat/kg tinggi byk klm1.58 3.60 2.00 45.60 kg1.58 3.60 2.00 45.60 kg0.40 18.96 kg

110.16 kg 244.8

berat/kg tinggi byk klm0.62 3.60 12.00 106.56 kg0.40 68.26 kg

174.82 kg

berat/kg tinggi byk klm0.62 3.00 0.00 0.00 kg0.40 0.00 kg

0.00 kg

berat/kg tinggi byk klm0.62 2.00 0.00 0.00 kg0.40 0.00 kg

0.00 kg

1,014.19 kg1,064.90 kg 161.20218

Berat Besi104.00 8.32 m3 dia. 8 0.395 kg/m

18.86 0.42 m3 dia. 10 0.617 kg/m43.00 0.62 m3 dia. 12 0.892 kg/m

9.36 m3 dia. 19 2.233 kg/m

83.20 m25.66 m2

10.32 m299.18 m2

berat/kg pjg total0.89 104.00 370.93 kg0.00 0.00 kg

370.93 kg

berat/kg pjg total0.89 18.86 67.26 kg0.00 0.00 kg

67.26 kg

berat/kg pjg total0.89 43.00 153.37 kg0.40 32.61 kg

185.98 kg

624.17 kg655.38 kg

Berat Besitebal dia. 8 0.395 kg/m

dia. 10 0.617 kg/m0.12 6.24 m3 dia. 12 0.892 kg/m0.12 6.24 m3 dia. 13 1.040 kg/m0.12 6.24 m3 dia. 16 1.583 kg/m0.12 6.24 m3 dia. 19 2.233 kg/m0.12 0.00 m30.12 0.00 m3

24.96 m3

pjg kellg0.00 416.00 m2

416.00 m2

tebal plat

0.12 51.39 kg0.12 51.39 kg

102.78 kg5.14 kg

107.92 kg

2,693.60 kg

lbr2.00 4.40 m20.00 0.00 m2

4.40 m2

0.00 0.00 m20.00 0.00 m2

0.00 0.00 m20.00 m2

0.00 208.00 m20.00 0.00 m20.00 0.00 m2

208.00 m2

7.25 m'

0.00 0.00 m2 40.80.00 0.00 m2 9.5

0.00 m2

208.00 m2

pjg0.00 0.00 m20.00 0.00 m2

0.00 m2

tinggi pjg3.40 76.00 258.40 m20.00 0.00 0.00 m20.00 0.00 0.00 m20.00 0.00 0.00 m20.00 0.00 0.00 m20.00 0.00 0.00 m2

258.40 m2 19380

lebar tinggi jml Luas0.80 2.10 2.00 3.36 m20.90 2.10 2.00 3.78 m21.80 2.10 2.00 7.56 m2

1.50 2.00 6.00 18.00 m20.60 0.60 2.00 0.72 m21.60 1.60 0.00 0.00 m21.20 1.30 0.00 0.00 m2

0.00 m233.42 m2

224.98 m2

0.00 m2449.96 m2

lebar tinggi jml0.80 2.10 0.00 0.00 m'0.90 2.10 0.00 0.00 m'1.60 0.00 0.00 m'3.50 2.30 0.00 0.00 m'

1.00 6.00 0.00 0.00 m'0.60 0.60 0.00 0.00 m'

1.80 2.30 0.00 0.00 m'1.20 1.30 0.00 0.00 m'1.20 2.30 0.00 0.00 m'

0.00 m'

Pjg Volume0.00 0.00 m30.00 0.00 m30.00 0.00 m30.00 0.00 m30.00 0.00 m30.00 0.00 m30.00 0.01 m3

0.00 0.00 m30.00 0.00 m30.00 0.00 m30.00 0.00 m30.00 0.00 m30.00 0.01 m3

0.00 0.02 m3

Pjg Volume0.00 0.00 m30.00 0.00 m30.00 0.00 m30.00 0.00 m30.00 0.00 m30.00 0.01 m3

0.00 0.00 m30.00 0.00 m30.00 0.00 m30.00 0.00 m30.00 0.01 m3

0.00 0.02 m3

a

36 158.22 m236 0.00 m236 0.00 m236 0.00 m220 0.00 m2

158.22 m2

a 350 a 450

0.1436 0.1668 m3 0.2240 0.2472 m3 0.2272 0.3168 m3 0.4474 0.5008 m3 0.6323 0.6848 m3 1.1340 m3 1.4256 m3

pjg 8/1229.50 0.01 0.2832 m3

0.00 m20.00 m20.00 m20.00 m2

0.00 m20.00 m20.00 m20.00 m20.00 m2

0.00 m'0.00 m'0.00 m'0.00 m'

0.00 m'0.00 m'0.00 m'0.00 m'0.00 m'0.00 m'

0.00 m20.00 m20.00 m20.00 m2

0.00 m20.00 m2

0.00 m2

0.00 m20.00 m20.00 m2

0.00 m20.00 m2

0.00 m'0.00 m'0.00 m'0.00 m'0.00 m'

0.00 m'0.00 m'

2 0.00 m'0.00 m'0.00 m'0.00 m'0.00 m'

67.50 m'

20.00 m'

99.05 m'

0.00 m'

47.50 m'

0.00 m'

145.50 m'

69.00 m'

Ukuran ruangpjg lebar watt4.00 4.50 1.00 PK 1 7954.20 2.50 0.58 PK 0.5 3903.00 3.00 0.50 PK 0.5 3903.25 4.00 0.72 PK 0.75 570

4.20 5.00 1.17 PK 1 7954.20 4.75 1.11 PK 1 795

3735

ksty

31,500 6,646 50,000 6,757

batang 71,000 6,636 batang 82,500 6,611 batang 126,000 6,632 batang 180,000 6,716

541,000 6

batangbatang

batangbatang

batang

DAFTAR HARGA BAHAN

NO JENIS BAHAN SAT1 Multipleks 12 mm lbr2 Cat dulux kg3 Tripleks 3 mm lbr4 Gpysum Board 12 mm Ex Jaya Board lbr5 Gpysum Board 9 mm Ex Jaya Board lbr6 HPL Ex artfoam lbr7 Hollow 4x4, t = 0,8 mm btg8 Hollow 4x4, t = 0,4 mm btg9 Hollow 2x4, t = 0,8 mm btg

10 Hollow 2x4, t = 0,4 mm btg11 Kaca Temperd 12 mm m²12 Kaca Temperd 8 mm m²13 Lakban Gypsum rol14 Lem kg15 Cornice Compound kg16 Paku Beton dus17 Allumunium 4 " Silver m'18 Sanblasting m219 assesories Lengkap + Handle ex. Kend (pintu kaca) set20 assesories Lengkap + Handle ex. Kend (pintu kayu) set21 Engsel psng22 Door Closer bh23 Door Stoper bh24 Solid edging PVC m'25 Wallpaper ex. Bravo roll26 Slang waterpass m'27 Benang pak28 Plastik cor rol29 Obat cor blek30 Gergaji set31 Isolasi pcs32 Pisau keramik pcs33 Ember cor hijau bh34 Pengki Karet bh35 Paku 5 kg36 Paku 7 kg37 Paku 10 kg38 Kaso 4/6 btg39 Papan cor lbr40 Besi 12 btg41 Besi 10 btg42 Besi 8 btg43 Besi 6 btg44 Besi 13 ulir btg45 Besi 16 ulir btg

46 Kawat bendrat kg47 Kawat ayam m'48 Pasir Urug m349 Pasir Putih m350 Pasir ekstra beton m351 Split 1/2 m352 Semen Bosowa 40 kg sak53 MU 450 sak54 Semen Putih kg55 Beton K 175 m356 Beton K 225 m357 Beton K 300 m358 Batako bh59 Engsel 3" psg60 Engsel 4" psg61 Hak Angin pcs62 Slot pcs63 Kunci kamar mandi set64 Kunci kamar set65 Handel Pintu utama psg66 Handel Pintu set67 Kunci pintu dorong set68 Closed Duduk/Monoblok TOTO CW 420 J set69 Wastafel TOTO LW 860 CJ/RX 104 LBGJ set70 Jet Shower TB 19 CSN CR set71 Floordrain SAN EI set72 Kran TOTO TX 11B set73 Paper Holder TS 116 R set74 Partisi Urinoir A 100 set75 Urinoar TOTO U 57 M set76 Gantungan Handuk TOTO TX 5 BEX set77 Kabel NYM 3 x 2,5 mm roll78 Kabel NYA 1,5 mm roll79 Kabel NYA 2,5 mm roll80 Kabel data cat 6 e roll81 Kabel ITC 2 x 2 x 0.65 mm roll82 Pipa conduit dia 20 mm btg83 Tee dos dia 20 mm bh84 Clamp dia 20 mm bh85 Sock dia 20 mm bh86 Staping + fisher set87 Inbowdos bh88 Outbowdos bh89 Outlet data bh90 Modul data cat 6e bh91 Outlet telepone bh92 Modul telepone bh93 Lampu DL set

94 Lampu T5 28 w dan accessoris set95 Lampu T5 14 w dan accessoris set96 Lampu DL halogen bh97 Lampu RM 2 x 36 m'98 Lampu RM 2 x 36 c/w battery roll99 Saklar 1 gang bh

100 Sakar 2 gang bh101 STK 1 gang bh102 Seng BJLS 0.5 mm roll103 Alumunium foil DS roll104 Glasswoll roll105 Alumunium tape roll106 Paku rivet dus107 Besi siku 300 x 300 btg108 Plinkute pile109 Kawat ikat kg110 sielent tube111 Longdrat 8 mm + ring dan mur set112 Head sprinkler pendet bh113 Head sprinkler conceal bh114 Pipa black stell sch 40 dia 1" btg115 Epoxy set116 seal tape bh117 fitting 1" unit118 Longdrat 8 mm + ring dan mur unit119 Drain air sprinkler 2 zone/lantai ( biaya drain dan koordinasi) unit120 Test sprinkler 2 zone/lantai( biaya koordinasi ) unit

DAFTAR HARGA UPAH KERJA

NO JENIS PEKERJAAN SAT1 Supervisor hari2 Kepala Tukang hari3 Tukang hari4 Kenek hari5 Pemasangan Plafon m26 Pemasangan Partisi double rangka m27 Pemasangan Partisi single rangka m28 Pemasangan HPL m29 Foreman elektrical hari

10 Skill 1 elektrial hari11 Skill 2 elektrical hari12 Semi skill m213 Helper m214 Uang makan lembur per lembur15 Uang makan kerja sampai pagi per lembur16 installasi lampu,saklar per titik

17 installasi STK,Data voice,MATV per titik18 Pasang lampu DL, T5. TL balk bh19 Pasang lampu RM, TKI,TKO,Baret bh20 Pasang saklar dan STK bh21 Foreman ducting hari22 Skill 1 ducting hari23 Skill 2 ducting hari24 Semi skill m225 Helper m226 Uang makan lembur per lembur27 Uang makan kerja sampai pagi per lembur28 Pasang ducting + isolasinya m229 pasang supply air grill/diffuser set30 Pasang return air grill/diffuser bh31 Supervisor pekerjaan AC hari32 Foreman plumbing & AC hari33 Skill 1 plumbing & AC hari34 Skill 2 plumbing & AC hari35 Semi skill m236 Helper m237 Uang makan lembur per lembur38 Uang makan kerja sampai pagi per lembur39 pasang pipa PVC inchi40 pasang pipa GIP/BS inchi41 Relocate sprinkler titik42 Pasang baru pipa sprinkler titik43 Pasang head sprinkler titik

DAFTAR PERALATAN KERJA

NO JENIS ALAT JUMLAH1 Mesin Potong Kayu lengkap 42 Mesin Jig Saw 33 Bor Gypsum 54 Ramset (alat tembak beton) 15 Scafolding 256 Kompresor + Gun Paku kayu 27 Bor Beton 28 Mesin lok seng 29 mesin bor beton 2

10 Mesin bor besi 611 Mesin bor duduk 212 Mesin Sney pipa 313 Cuting whell 314 Mesin las listrik 415 Las acytilin 216 Las PVC 217 Merger installasi 1

18 Merger Rotation 3 phase 119 Tester 320 Infrared temperatur 121 Air flow temperatur 122 Steger/scafolding 2523 Tangga alumuniaum 1224 Box alat 525 Body harness 626 Hycook 527 Pemanas pipa PPR 428 Pump test manual 229 Pump test elektrik 130 Cutting poly urethane 131 Tang press kabel manual 232 Tang press kabel hidrolik 133 Panel Temporary 834 Gerinda tangan 535 Vacum cleaner Ac 236 Tang ampere 237 Grounding test 1

Jakarta, 15 Desember 2014PT. ARGAS DILAGA

Sayuti MoekriDirektur Utama

DAFTAR HARGA BAHAN

HRG SATUAN 202,800 68,900 125,000 88,400 68,250 165,000 63,310 32,500 104,000 26,000 598,000 338,000 9,100 26,000 3,900 39,000 156,000 130,000 5,179,200 2,233,400 149,500 424,060 32,500 23,400 195,000 3,250 75,400 5,850 26,000 28,600 10,400 78,000 5,850 11,700 15,600 15,600 15,600 37,700 18,200 96,200 67,600 40,300 20,800 146,900 171,600

23,400 15,600 156,000 253,500 292,500 292,500 57,200 175,500 3,900 838,500 864,500 955,500 2,275 32,500 42,900 72,500 28,600 91,650 112,938 195,000 172,250 74,100 2,460,000 1,897,350 559,650 98,800 166,400 356,720 961,870 2,074,800 472,290 1,475,500 260,000 383,500 1,904,500 1,170,000 10,660 5,850 1,040 1,040 325 6,825 9,750 32,500 113,100 27,300 32,500 160,225

140,400 98,800 199,550 536,055 968,500 24,700 29,250 29,250 4,940,000 1,040,000 799,500 45,500 887,250 50,050 825,500 29,250 32,500 31,200 110,500 462,150 286,000 182,000 2,600 11,050 15,600 1,690,000 1,098,500

DAFTAR HARGA UPAH KERJA

HRG SATUAN 214,500 150,000 100,000 70,000 32,500 45,500 26,000 97,500 110,500 104,000 97,500 94,250 84,500 19,500 26,000 61,750

78,000 13,000 16,250 11,050 123,500 110,500 104,000 97,500 84,500 19,500 26,000 110,500 68,250 52,000 195,000 143,000 117,000 107,250 97,500 84,500 19,500 26,000 13,000 29,250 130,000 130,000 26,000

DAFTAR PERALATAN KERJA

STATUS milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri

milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri milik sendiri