PEMERINTAH KOTA KEDIRIDINAS PEKERJAAN UMUM

HARGA SATUAN POKOK BARANG DAN JASA DAU TAHUN ANGGARAN 2014

A. HARGA SATUAN BAHAN

No. U R A I A N SAT. HARGA SATUAN

1 Pasir urug m3 65,000.00

2 Pasir pasang/Pasir beton m3 130,000.00

3 Pasir batu m3 68,800.00

4 Tanah urug m3 55,000.00

5 Tanah katel m3 56,100.00

6 Tanah sirtu m3 76,300.00

7 Batu bata merah kelas I bh 600.00

8 Kapur pasang m3 440,000.00

9 Ijuk kg 27,500.00

10 Semen PC (Gresik) @ 40 kg. KG 1,750.00

11 Semen putih kg 2,000.00

12 Semen berwarna kg 13,600.00

13 Semen merah m3 66,000.00

14 Batu pecah 20/20 cm. m3 148,500.00

15 Batu belah 15/20 cm. m3 180,000.00

16 Batu pecah 5/7 cm. m3 179,700.00

17 Batu pecah 4/6 cm. m3 167,800.00

18 Batu kali pecah 3/5 cm. m3 209,200.00

19 Batu cor/koral beton 2/3 cm. m3 250,000.00

20 Batu pecah 1/2 cm. m3 244,800.00

21 Batu pecah 0,5/1 cm. m3 253,000.00

22 Marmer bakar m2 100,900.00

23 Batu ampyang kemas kg 3,000.00

24 Batu kupang warna kg 3,000.00

25 Batu palimanan m2 115,800.00

26 Besi beton ulir kg 13,400.00

27 Besi beton polos kg 11,700.00

28 Kawat ikat beton kg 25,000.00

29 bj 6,600.00

30 Besi profil WF kg 12,500.00

31 Besi plat strip kg 19,400.00

32 Besi plat bordes 2,3 mm. lbr -

33 Besi profil WF <= 200 mm. kg 12,500.00

34 Besi profil WF <= 200 mm. s/d 400 mm. kg 12,500.00

35 Besi siku L 30,30,3 mm. ljr 18,700.00

36 Besi siku L 40,40,4 mm. ljr 48,000.00

37 Besi siku L 60,60,6 mm. ljr 53,000.00

38 Elektroda baja/kawat las baja (RB) kg 33,000.00

39 Kawat nyamuk kasa aluminium m2 50,500.00

40 Kawat duri pagar roll 83,600.00

41 Tiang pagar BRC 2" tinggi 1,5 m. btg -

42 Pagar BRC 1,2x2,4 m. unit -

43 Pintu dorong BRC 1,2x3,0 m. unit -

44 Pintu swing ganda BRC 1,2x3,0 m. unit -

45 Pagar besi komplit aksesoris m2 517,000.00

46 Pintu pagar besi komplit aksesoris m2 550,000.00

47 Pintu rolling door alumunium (Alexindo)/setara m2 522,500.00

48 Pintu harmonika m2 750,000.00

49 Kosen jendela polos aluminium (Alexindo)/setara m' 99,000.00

50 Kosen jendela alur aluminium (Alexindo)/setara m' 99,000.00

51 Kosen pintu polos aluminium (Alexindo)/setara m' 99,000.00

52 Kosen pintu alur aluminium (Alexindo)/setara m' 99,000.00

53 Karet kusen alumunium/profil kaca m' 5,500.00

Besi beugel/baut 25 cm. f 12 mm.

HSPBJ 2014/Dinas PU Kota Kediri/Hal. 1#6

No. U R A I A N SAT. HARGA SATUAN

54 Pintu kaca rangka aluminium unit 1,540,000.00

55 Jendela kaca rangka aluminium unit 770,000.00

56 Aluminium strip m' -

57 Pipa hollow aluminium (1 x 3) cm m' -

58 Besi hollow (2x4) cm m 11,000.00

59 Besi hollow (4x4) cm m 15,400.00

60 Besi hollow (5x5) cm m -

61 Besi hollow (6x6) cm m -

62 Sealant tube 24,200.00

63 Fixer skrup bh 600.00

64 Atap polycarbonat rangka stainless steel m2 715,000.00

65 Atap polycarbonat rangka hollow m2 660,000.00

66 Atap zincalum t.0,40 (terpasang) m2 -

67 bt 169,200.00

68 Kayu jati balok 8/12 cm. m3 18,700,000.00

69 Kayu jati usuk 5/7 cm. m3 16,115,000.00

70 Kayu jati reng 3/5 cm. m3 16,104,000.00

71 Kayu jati papan m3 19,250,000.00

72 Kayu kamper balok 8/12 cm. m3 7,500,000.00

73 Kayu kamper usuk 5/7 cm. m3 7,500,000.00

74 Kayu kamper reng 3/5 cm. m3 7,500,000.00

75 Kayu kamper papan m3 7,500,000.00

76 Kayu kruing balok 8/12 cm. m3 6,500,000.00

77 Kayu kruing usuk 5/7 cm. m3 6,500,000.00

78 Kayu kruing reng 3/5 cm. m3 6,500,000.00

79 Kayu kruing papan m3 6,500,000.00

80 Kayu meranti balok 8/12 cm. m3 5,225,000.00

81 Kayu meranti usuk 5/7 cm. m3 4,620,000.00

82 Kayu meranti reng 3/5 cm. m3 5,280,000.00

83 Kayu meranti papan m3 5,021,500.00

84 Kayu meranti bekisting m3 4,400,000.00

85 List kayu profil m' 6,100.00

86 Kayu bakar m3 1,246,700.00

87 Gedek guling m2 16,500.00

88 bt 21,200.00

89 Teakwood 110x210x4 mm. lbr 71,500.00

90 Teakwood 122x244x4 mm. lbr 99,000.00

91 Plywood 122x244x4 mm. lbr 60,700.00

92 Woodplank (20 x 400 x 1) cm lbr 68,200.00

93 Woodplank (30 x 400 x 1) cm lbr 78,300.00

94 Triplek 122x244x9 mm. lbr 125,200.00

95 Triplek 90x200x4 mm. lbr 53,900.00

96 Triplek 110x210x4 mm. lbr 71,500.00

97 Triplek 120x240x4 mm. lbr 71,700.00

98 Triplek 122x244x4 mm. lbr 72,800.00

99 Eternit gresik m2 16,200.00

100 Asbes gelombang bsr. (3,05x1,05) tb. 5 mm setara Gresik lbr 123,800.00

101 Asbes gelombang kcl. (3,05x1,05) tb. 4 mm setara Gresik lbr 96,300.00

102 Asbes wuwung gelombang bsr. 5 mm. psg 79,400.00

103 Asbes wuwung gelombang kcl. 4 mm. psg 37,400.00

104 Seng gelombang BJLS 30 (1,8x0,9) m. lbr 79,600.00

105 Seng datar BJLS 30 (0,9x1,0) m. lbr 29,700.00

106 Genteng kodok (ex. Trenggalek) bj 2,800.00

107 Genteng wuwung kodok (ex. Trenggalek ) bj 5,500.00

108 Genteng mantili bj 3,300.00

109 Genteng wuwung mantili bj 7,200.00

110 Genteng beton bj 3,300.00

111 Genteng wuwung beton bj 5,900.00

112 Paku biasa kg 17,000.00

113 Paku pancing kg 25,300.00

114 Paku asbes/ulir bh 319.00

115 Paku seng payung bj 125.00

Kayu dolken f 8-10 cm.

Bambu f 10-12 cm. pj. 6 m.

HSPBJ 2014/Dinas PU Kota Kediri/Hal. 2#6

No. U R A I A N SAT. HARGA SATUAN

116 Paku sumbat bj -

117 Paku skrup bh 400.00

118 Glass blok bh 20,300.00

119 Roster merah bh 7,300.00

120 Paving stone abu-abu persegi m2 47,000.00

121 Paving stone abu-abu segi enam tebal 6 cm. m2 41,100.00

122 Paving stone merah segi enam tebal 6 cm. m2 44,000.00

123 Paving stone abu-abu persegi K.300 m2 66,300.00

124 Tegel keramik uk. 20 x 20 cm. m2 50,000.00

125 Tegel keramik uk. 30 x 30 cm. m2 60,000.00

126 Tegel keramik uk. 40 x 40 cm. m2 70,000.00

127 Tegel keramik uk. 20 x 25 cm. m2 55,000.00

128 Uskup K-300 bj 55,000.00

129 Uskup K-200 bj 49,500.00

130 bh 55,000.00

131 bh 65,000.00

132 bh 75,000.00

133 bh 85,000.00

134 bh 95,000.00

135 bh 105,000.00

136 bh 125,000.00

137 bh 140,000.00

138 Buis beton U 40 cm. bh 32,600.00

139 Buis beton U 50 cm. bh 39,600.00

140 Pipa PVC 1/2" Maspion AW m' 6,000.00

141 Pipa PVC 3/4" Maspion AW m' 7,150.00

142 Pipa PVC 1" Maspion AW m' 8,950.00

143 Pipa PVC 1,5" Maspion AW m' 15,600.00

144 Pipa PVC 2" Maspion D m' 12,250.00

145 Pipa PVC 3" Maspion D m' 23,625.00

146 Pipa PVC 4" Maspion D m' 32,800.00

147 Pipa PVC 5" Maspion D m' 68,200.00

148 Keni PVC 1/2" bh 1,200.00

149 Keni PVC 3/4" bh 1,800.00

150 Keni PVC 2" bh 5,500.00

151 Keni PVC 3" bh 9,400.00

152 Keni PVC 4" bh 15,800.00

153 Keni PVC 5" bh 30,800.00

154 Klem pipa PVC bh 11,500.00

155 Tandon air fiberglass kap. 1100 ltr. (Pinguin) bh 1,650,000.00

156 Kaca polos tb. 3 mm. m2 89,900.00

157 Kaca polos tb. 5 mm. m2 100,900.00

158 Kaca ray band tb. 5 mm. m2 119,900.00

159 Kaca nako krepyak dan kerangka m2 71,500.00

160 Cat besi emco kg 70,000.00

161 Cat kayu emco kg 70,000.00

162 Cat meni cap pedang kg 40,000.00

163 Cat tembok (Decolith)/sejenis kg 20,000.00

164 Cat plincute (Avian)/sejenis kg 59,400.00

165 Plamir tembok kg 18,800.00

166 Plamir kayu kg 25,000.00

167 Thinner B (minyak cat) lt 18,000.00

168 Politur lt 58,800.00

169 Lem (Rajawali) bks 13,000.00

170 Lem kayu (Fox) kg 39,100.00

171 Kertas gosok lbr 3,800.00

172 Engsel H stl 8,700.00

173 Engsel kuningan (Arch) stl 32,900.00

174 Grendel bh 27,500.00

175 Grendel kuningan/krom bh 36,900.00

176 Grendel tanam bh 37,200.00

Buis beton f 15 cm.

Buis beton f 25 cm.

Buis beton f 30 cm.

Buis beton f 40 cm.

Buis beton f 50 cm.

Buis beton f 60 cm.

Buis beton f 80 cm.

Buis beton f 100 cm.

177 Kunci gembok besar bh 48,100.00

HSPBJ 2014/Dinas PU Kota Kediri/Hal. 3#6

No. U R A I A N SAT. HARGA SATUAN

178 Kunci gembok sedang bh 21,600.00

179 Kunci tanam 808 bh 13,200.00

180 Kunci tanam km/wc bh 41,800.00

181 Kunci tanam (Kuda Terbang) bh 63,800.00

182 Kunci selot bh 115,500.00

183 Handle Pintu stainless steel bh 143,000.00

184 Hak angin bj 13,600.00

185 Hak angin sikutan stl 24,000.00

186 Hak angin lurus (stel maju/mundur) stl 22,600.00

187 Selang spiral saluran kran set 55,000.00

188 Closet duduk porselin (monoblock) bh 1,306,300.00

189 Closet jongkok porselin (INA) bh 139,800.00

190 Kran air bh 24,800.00

191 TBA/isolasi rol 5,200.00

192 Wastafel besar bh 209,000.00

193 Watermur bh 19,000.00

194 Sifon wasser set 138,600.00

195 Floor drain bh 38,500.00

196 Septictank Bio Filter Kapasitas 0,75 M3 bh 2,750,000.00

197 Septictank Bio Filter Kapasitas 1 M3 bh 3,531,000.00

198 Septictank Bio Filter Kapasitas 1,5 M3 bh 4,400,000.00

199 Septictank Bio Filter Kapasitas 2 M3 bh 5,335,000.00

200 Septictank Bio Filter Kapasitas 3 M3 bh 8,382,000.00

201 Septictank Bio Filter Kapasitas 4 M3 bh 23,793,000.00

202 Sumur peresap bh 29,425.00

203 Fitting plafon set 32,300.00

204 T dos PVC set 1,300.00

205 Isolator bh 16,500.00

206 Stop kontak (Broco) bh 16,300.00

207 Skakelar tunggal (Broco) bh 13,700.00

208 Zekering SPA 60 A bh 33,000.00

209 Panel box 290 x 30 cm bh 220,000.00

210 Lampu TL 20 W komplit (Philips) bh 70,600.00

211 Lampu Tl 40 W komplit (Philips) bh 87,100.00

212 Lampu pijar bh 22,000.00

213 Kabel NYA 500 V 1x2,5 mm. m' 6,600.00

214 Kabel NYA 450-750 V 1x1,5 mm. m' 7,200.00

215 Kabel NYA 450-750 V 1x2,5 mm. m' 9,900.00

216 Pompa air Nasional GP 125 JB l/dt bh 1,595,000.00

217 Pompa air Gold Star 10 KPOa 185 l/dt bh 1,760,000.00

218 Pompa tangan bh 220,000.00

219 Premium (industri) ltr 13,800.00

220 Minyak solar (industri) ltr 13,750.00

221 Minyak tanah (industri) ltr 14,300.00

222 Minyak bakar (industri) ltr 12,700.00

223 Olie (Meditran SX 15W/40)/setara ltr 36,300.00

224 Olie (Mesran Super)/setara ltr 36,300.00

225 Residu ltr 2,200.00

226 Minyak bekisting ltr 7,300.00

227 Thermoplast kg 69,740.00

228 Glass beads kg 20,900.00

229 Rumput taman m2 33,000.00

230 Rumput gebal m2 35,200.00

231 Bak mandi fiberglass bh 425,400.00

232 Bak cuci piring stainles steel bh 220,000.00

233 Sabun cream kg 8,300.00

234 Kuas 4" eterna bh 21,500.00

235 Pasang pintu KM/WC PVC unit 260,500.00

236 Pipa galvanis 1/2" (BSA) ljr 153,750.00

237 Pipa galvanis 3/4" (BSA) ljr 199,400.00

238 Pipa galvanis 1" (BSA) ljr 286,000.00

239 Pipa galvanis 1 1/4" (BSA) ljr 367,700.00

HSPBJ 2014/Dinas PU Kota Kediri/Hal. 4#6

No. U R A I A N SAT. HARGA SATUAN

240 Pipa galvanis 1 1/2" (BSA) ljr 405,900.00

241 Pipa galvanis 2" (BSA) ljr 589,600.00

242 Pipa galvanis 2.5" (BSA) ljr 765,050.00

243 Pipa galvanis 3" (BSA) ljr 960,300.00

244 Pipa galvanis 4" (BSA) ljr -

245 Batu candi m2 113,700.00

246 Roof light fiberglass 0.85 x 2.50 m. lbr 132,000.00

247 Skakelar ganda (Broco) bh 16,800.00

248 Soda api kg 13,700.00

249 Cerlak ltr 46,800.00

250 Gypsum board (120 x 240) cm tbl. 9 mm setara Elephant lbr 71,500.00

251 List gypsum profil 10 cm. m' 9,900.00

252 Urinoir bh 751,300.00

253 Door holder stel 58,300.00

254 Door stop bh 27,500.00

255 Kunci silinder bh 56,900.00

256 Nok genteng beton bh 10,560.00

257 Wallpaper lbr. 50 cm. (Contract Paper) m' 66,000.00

258 Porselin dinding 11 x 11 cm. m2 3,300.00

259 Karpet m2 79,200.00

260 Ubin PC abu-abu 20 x 20 cm. bh -

261 Ubin PC warna 20 x 20 cm. bh 3,410.00

262 Plint ubin PC abu-abu 10 x 20 cm. bh 1,760.00

263 Plint ubin PC warna 10 x 20 cm. bh 2,090.00

264 Baja ringan mutu tinggi profil C 75.100 m' 34,375.00

265 Baja ringan mutu tinggi profil C 75.75 m' 26,125.00

266 Reng (batten) m' 16,500.00

267 Screw bh 500.00

268 Dynabolt bh 1,700.00

269 Plat bracing m' 7,500.00

270 Aspal curah (AC 60-70) kg 11,200.00

271 Aspal drum kemas kg 12,300.00

272 Grease kg 65,000.00

273 Kawat galvanis kg 17,600.00

274 Tang pemotong kawat bh 32,900.00

275 Palu besar/bodem bh 47,700.00

276 Pisau besar bh 31,400.00

277 Keranjang bh 14,500.00

278 Gergaji bh 59,200.00

279 Ganco bh 53,200.00

280 Sabit besar bh 82,500.00

281 Kansteen 10.20.40 K-225 (terpasang) m' -

282 Kansteen 15.25.40 K-225 (terpasang) m' -

283 Kansteen 15.30.50 K-225 (terpasang) m' -

284 Kansteen 18.30.60 K-225 (terpasang) m' -

285 Keramik trotoar uk. 33,3 x 33,3 cm. m2 -

286 Keramik mozaik 80 x 80 cm. (terpasang) unit -

287 Main Hole (cast iron) 70 x 70 cm. (terpasang) unit -

288 Box Culvert U 150.150.120.15 cm. dan pcs 15,884,000.00

CU 150.20.120 cm. (terpasang)

289 Selang Pemadam bh -

290 Nozzle bh -

291 Fire man Shirt bh 82,500.00

292 Sepatu Safeti bh -

293 Helm Pemadam bh -

294 "x" Conection bh -

295 Lampu SL 20 watt (phillips) bh -

B280
PU:
B283
PU:

296 Lampu SL 23 watt (phillips) bh 50,800.00

HSPBJ 2014/Dinas PU Kota Kediri/Hal. 5#6

B. HARGA SATUAN UPAH TENAGA KERJA

No. U R A I A N SAT.HARGA SATUAN

(Rp.)

1 Mandor org/hr 75,000.00

2 Kepala Tukang Batu org/hr 70,000.00

3 Kepala Tukang Kayu org/hr 70,000.00

4 Kepala Tukang Cat org/hr 70,000.00

5 Kepala Tukang Besi org/hr 70,000.00

6 Kepala Tukang Gali org/hr 65,000.00

7 Kepala Tukang Listrik org/hr 70,000.00

8 Kepala Tukang Pipa org/hr 70,000.00

9 Kepala Tukang Taman org/hr 70,000.00

10 Tukang Batu org/hr 65,000.00

11 Tukang Kayu org/hr 65,000.00

12 Tukang Cat org/hr 65,000.00

13 Tukang Gali org/hr 60,000.00

14 Tukang Besi org/hr 65,000.00

15 Tukang Politur org/hr 65,000.00

16 Tukang Aspal org/hr 65,000.00

17 Tukang Pipa org/hr 65,000.00

18 Tukang Listrik org/hr 65,000.00

19 Tukang Taman org/hr 65,000.00

20 Pembantu Tukang Batu org/hr 50,000.00

21 Pembantu Tukang Kayu org/hr 50,000.00

22 Pembantu Tukang Cat org/hr 50,000.00

23 Pembantu Tukang Besi org/hr 50,000.00

24 Pembantu Tukang Listrik org/hr 50,000.00

25 Pembantu Tukang Pipa org/hr 50,000.00

26 Tukang Bongkar org/hr 50,000.00

27 Pekerja/Buruh tak terampil org/hr 50,000.00

28 Buruh terampil org/hr 50,000.00

29 Pengemudi/Sopir org/hr 65,000.00

30 Pembantu Sopir org/hr 45,000.00

31 Masinis org/hr 45,000.00

32 Pembantu Masinis org/hr 45,000.00

33 Mekanik org/hr 45,000.00

34 Pembantu Mekanik org/hr 45,000.00

35 Operator org/hr 65,000.00

36 Pembantu Operator org/hr 45,000.00

37 Penjaga malam org/hr 60,000.00

38 Penjaga api org/hr 45,000.00

Kediri, 2014KEPALA DINAS PEKERJAAN UMUM

KOTA KEDIRI

Ir. HADI WAHJONO, MM.

Pembina Utama MudaNIP. 19630513 199202 1 002

HSPBJ 2014/Dinas PU Kota Kediri/Hal. 6#6

Pasir urug m3 50,400.00

Pasir pasang/Pasir beton m3 116,500.00

Pasir batu m3 111,500.00

Tanah urug m3 45,000.00

Tanah katel m3 49,350.00

Tanah sirtu m3 59,000.00

Batu bata merah kelas I bh 500.00

Kapur pasang m3 561,750.00

Ijuk kg 34,650.00

Semen PC (Gresik) @ 40 kg zak 56,400.00

Semen putih kg 1,900.00

Semen berwarna kg 5,500.00

Semen merah m3 202,000.00

Batu pecah 20/20 cm. m3 162,750.00

Batu belah 15/20 cm. m3 168,000.00

Batu pecah 5/7 cm. m3 -

Batu pecah 4/6 cm. m3 143,500.00

Batu kali pecah 3/5 cm. m3 176,400.00

Batu cor/koral beton 2/3 cm m3 202,000.00

Batu pecah 1/2 cm. m3 217,500.00

Batu pecah 0,5/1 cm. m3 250,740.00

Marmer bakar m2 111,900.00

Batu ampyang kemas kg 21,000.00

Batu kupang warna kg 7,500.00

Batu palimanan m2 93,000.00

Besi beton ulir kg 12,800.00

Besi beton polos kg 12,800.00

Kawat ikat beton kg 21,500.00

bj 12,810.00

Besi profil WF kg 12,300.00

Besi plat strip kg 13,850.00

KOSONG Besi plat bordes 2,3 mm. lbr 1,050,000.00

Besi profil WF <= 200 mm. kg 17,000.00

Besi profil WF <= 200 mm. kg 17,000.00

? Besi siku L 30,30,3 mm. ljr 99,000.00 112,200.00

? Besi siku L 40,40,4 mm. ljr 152,000.00

? Besi siku L 60,60,6 mm. ljr 200,000.00

Elektroda baja/kawat las ba kg 31,000.00

Kawat nyamuk kasa alumin m2 25,000.00

Kawat duri pagar roll 177,000.00

KOSONG Tiang pagar BRC 2" tinggi 1 btg 128,850.00

KOSONG Pagar BRC 1,2x2,4 m. unit 365,000.00

KOSONG Pintu dorong BRC 1,2x3,0 m unit 1,350,000.00

KOSONG Pintu swing ganda BRC 1,2 unit 1,250,000.00 1312500Pagar besi komplit aksesori m2 450,000.00

Pintu pagar besi komplit ak m2 530,000.00

Pintu rolling door alumuniu m2 530,000.00

? Pintu harmonika m2 1,250,000.00

Kosen jendela polos alumin m' 60,000.00

Kosen jendela alur alumini m' 63,000.00

Kosen pintu polos aluminiu m' 74,550.00

Kosen pintu alur aluminium m' 78,750.00

Karet kusen alumunium/prof m' 2,100.00

Besi beugel/baut 25 cm. f 12 mm.

KOSONG Aluminium strip m' 8,500.00

KOSONG

60,000 6,000 6,000

100000 10,000 10,000

KOSONG 150000 15,000 15,000

KOSONG 275000 27,500 27,500 Sealant tube 36,750.00

Fixer skrup bh 400.00

Atap polycarbonat rangka st m2 785,000.00

KOSONG BAAHANbt 33,000.00 1.2

Kayu jati balok 8/12 cm. m3 28,000,000.00 4Kayu jati usuk 5/7 cm. m3 17,500,000.00 0.065Kayu jati reng 3/5 cm. m3 17,500,000.00 TENAGAKayu jati papan m3 28,000,000.00 0.075Kayu kamper balok 8/12 cm m3 9,900,000.00 0.1Kayu kamper usuk 5/7 cm. m3 9,900,000.00 0.02Kayu kamper reng 3/5 cm. m3 9,900,000.00 0.0025Kayu kamper papan m3 9,900,000.00

Kayu kruing balok 8/12 cm. m3 7,000,000.00

Kayu kruing usuk 5/7 cm. m3 7,000,000.00

Kayu kruing reng 3/5 cm. m3 7,000,000.00

Kayu kruing papan m3 7,000,000.00

Kayu meranti balok 8/12 cm m3 4,900,000.00

Kayu meranti usuk 5/7 cm. m3 4,900,000.00

Kayu meranti reng 3/5 cm. m3 4,900,000.00

Kayu meranti papan m3 4,900,000.00

Kayu meranti bekisting m3 4,100,000.00

List kayu profil m' 3,300.00

Kayu bakar m3 115,000.00

Gedek guling m2 13,850.00

bt 17,000.00

Teakwood 110x210x4 mm. lbr 93,000.00

Teakwood 122x244x4 mm. lbr 135,250.00

Plywood 122x244x3 mm. lbr 81,500.00

Triplek 122x244x9 mm. lbr 155,400.00

Triplek 90x200x2,7 mm. lbr 49,650.00

Triplek 110x210x4 mm. lbr -

Triplek 120x240x4 mm. lbr 72,150.00

Triplek 122x244x4mm. lbr 73,700.00

Eternit gresik m2 17,850.00

Asbes gelombang bsr. (3,05 lbr 115,500.00

Asbes gelombang kcl. (3,05 lbr 89,250.00

Asbes wuwung gelombang b psg 30,450.00

Asbes wuwung gelombang k psg 42,700.00

Seng gelombang BJLS 30 (1 lbr 79,400.00

Seng datar BJLS 30 (0,9x1, lbr 47,350.00

Genteng kodok (ex. Trengg bj 1,500.00

Genteng wuwung kodok (ex. bj 5,000.00

Genteng beton bj 2,200.00

Genteng wuwung beton bj 4,300.00

Paku biasa kg 15,800.00

Paku pancing kg 23,000.00

Paku asbes/ulir bh 315.00 1.0126984127Paku seng payung bj 125.00 1Paku sumbat bj 80.00

Paku skrup bh 350.00

Glass blok bh 20,000.00

Roster merah 20 x 20 bh 4,200.00

Kayu dolken f 8-10 cm.

Bambu f 10-12 cm. pj. 6 m.

KOSONG Paving stone abu-abu perse m2 34,125.00

367.5 Paving stone abu-abu segi m2 38,325.00

Paving stone merah segi e m2 42,300.00

Paving stone K.300 m2 60,450.00

Tegel keramik uk. 20 x 20 m2 40,950.00

Tegel keramik uk. 30 x 30 m2 43,000.00

Tegel keramik uk. 40 x 40 m2 55,650.00

Tegel keramik uk. 20 x 25 m2 52,500.00

bh 50,027.00

bh 34,000.00

bh 50,000.00

550 3300

460 2760

bh 60,000.00

bh 70,000.00

Buis beton U 15 cm. bh 13,000.00

Buis beton U 20 cm. bh 17,000.00

Buis beton U 30 cm. bh 25,000.00

Buis beton U 40 cm. bh 30,000.00

Buis beton U 50 cm. bh 35,000.00

Pipa PVC 1/2" Maspion AW m' 6,600.00

Pipa PVC 3/4" Maspion AW m' 7,500.00

Pipa PVC 1" Maspion AW m' 38,000.00 9,500.00

15585 Pipa PVC 1,5" Maspion AW m' 39,000.00 9,750.00 Pipa PVC 2" Maspion D m' 45,465.00 11,366.25 Pipa PVC 3" Maspion D m' 77,000.00 19,250.00 Pipa PVC 4" Maspion D m' 107,000.00 26,750.00 Pipa PVC 5" Maspion D m' 150,000.00 37,500.00 Keni PVC 1/2" bh 1,200.00

Keni PVC 3/4" bh 2,100.00

Keni PVC 2" bh 3,500.00

Keni PVC 3" bh 7,980.00

Keni PVC 4" bh 13,000.00

Keni PVC 5" bh 30,000.00

Klem pipa PVC bh 14,910.00

Tandon air fiberglass kap. 1 bh 1,618,260.00

Kaca polos tb. 3 mm. m2 78,750.00

Kaca polos tb. 5 mm. m2 96,600.00

Kaca ray band tb. 5 mm. m2 125,000.00

? Kaca nako krepyak dan ker m2 350,000.00

Cat besi emco kg 59,000.00

Cat kayu emco kg 59,000.00

Cat meni cap pedang kg 18,250.00

92680 Cat tembok (Decolith)/sejen kg 15,000.00 80000Cat plincute (Avian)/sejenis kg 40,000.00

Plamir tembok kg 14,500.00

Plamir kayu kg 18,500.00

Thinner B (minyak cat) lt 8,300.00

Politur lt 45,000.00

Lem (Rajawali) bks 12,500.00

Lem kayu (Fox) kg 15,000.00

Kertas gosok lbr 4,900.00

Engsel H stl 9,000.00

Engsel kuningan (Arch) stl 19,950.00

Grendel bh 6,200.00

Grendel kuningan/krom bh 11,500.00

Grendel tanam bh 28,650.00

Buis beton f 15 cm.

Buis beton f 20 cm.

Buis beton f 30 cm.

Buis beton f 40 cm.

Buis beton f 50 cm.

Kunci gembok besar bh 31,800.00

Kunci gembok sedang bh 16,600.00

Kunci tanam 808 bh 10,800.00

Kunci tanam km/wc bh 37,550.00

Kunci tanam (Kuda Terbang bh 71,000.00

Kunci selot bh 170,000.00

Hak angin bj 5,000.00

Hak angin sikutan stl 21,000.00

Hak angin lurus (stel maju stl 36,950.00

Selang spiral saluran kran set 46,400.00

Closet duduk porselin (mon bh 1,280,000.00

Closet jongkok porselin (IN bh 125,000.00

Kran air bh 25,000.00

TBA/isolasi rol 2,500.00

Wastafel besar bh 175,000.00

Watermur bh 15,750.00

Sifon wasser set 120,000.00

Floor drain bh 21,000.00

Septictank Bio Filter Kapas bh 1,690,000.00

Septictank Bio Filter Kapas bh 3,050,000.00

Septictank Bio Filter Kapas bh 3,750,000.00

Septictank Bio Filter Kapas bh 4,600,000.00

Septictank Bio Filter Kapas bh 7,250,000.00

Septictank Bio Filter Kapas bh 20,600,000.00

? Sumur peresap bh -

Fitting plafon set 8,000.00

T dos PVC set 8,100.00

Isolator bh 5,000.00

Stop kontak (Broco) bh 14,000.00

Skakelar tunggal (Broco) bh 16,500.00

Zekering SPA 60 A bh 7,250.00

Panel box 290 x 30 cm bh 390,000.00

Lampu TL 20 W komplit (Phi bh 56,000.00

Lampu Tl 40 W komplit (Phil bh 100,800.00

Lampu pijar bh 4,300.00

Kabel NYA 500 V 1x2,5 mm m' 3,200.00

Kabel NYA 450-750 V 1x1, m' 3,500.00

Kabel NYA 450-750 V 1x2, m' 3,750.00

Pompa air Nasional GP 125 J bh 438,375.00

Pompa air Gold Star 10 KPO bh 1,190,000.00

Pompa tangan bh 330,225.00

Premium (industri) ltr 9,300.00 9,300.00 9.30

13750 Minyak solar (industri) ltr 12,000.00 12,000.00 12.00Minyak tanah (industri) ltr 12,250.00 12,250.00 12.25Minyak bakar (industri) ltr 6,900.00 6,900.00 6.90Olie (Meditran SX 15W/40)/ ltr 39,000.00 39,000.00 9,750.00Olie (Mesran Super)/setara ltr 30,975.00 30,975.00 7,743.75Residu ltr 1,400.00

Minyak bekisting ltr 6,300.00

Thermoplast kg 60,350.00

Glass beads kg 22,100.00

Rumput taman m2 24,350.00

Rumput gebal m2 9,600.00

Bak mandi fiberglass bh 275,000.00

Bak cuci piring stainles stee bh 175,000.00

Sabun cream kg 7,500.00

Kuas 4" bh 15,500.00

Pasang pintu KM/WC PVC unit 383,250.00

Pipa galvanis 1/2" (BSA) ljr 120,000.00

Pipa galvanis 3/4" (BSA) ljr 163,900.00

Pipa galvanis 1" (BSA) ljr 199,600.00

Pipa galvanis 1 1/4" (BSA) ljr 257,150.00

Pipa galvanis 1 1/2" (BSA) ljr 321,400.00

Pipa galvanis 2" (BSA) ljr 702,500.00

Pipa galvanis 2.5" (BSA) ljr 960,900.00

Pipa galvanis 3" (BSA) ljr 1,031,625.00

KOSONG Pipa galvanis 4" (BSA) ljr 1,389,875.00

Batu candi m2 101,220.00

Roof light fiberglass 0.85 x lbr 113,000.00

Skakelar ganda (Broco) bh 19,550.00

Soda api kg 19,000.00

Cerlak ltr 24,500.00

Gypsum board (120 x 240) lbr 70,000.00

List gypsum profil 10 cm. m' 20,000.00

Urinoir bh 290,000.00

Door holder stel 245,000.00

Door stop bh 16,500.00

Kunci silinder bh 220,000.00

Nok genteng beton bh 9,000.00

Wallpaper lbr. 50 cm. (Cont m' 22,000.00

Porselin dinding 11 x 11 cm m2 65,000.00

Karpet m2 31,000.00

KOSONG Ubin PC abu-abu 20 x 20 c bh 2,950.00

Ubin PC warna 20 x 20 cm. bh 3,250.00

Plint ubin PC abu-abu 10 x bh 1,500.00

Plint ubin PC warna 10 x 20 bh 1,750.00

Baja ringan mutu tinggi pro m' 33,700.00

Baja ringan mutu tinggi prof m' 25,500.00

Reng (batten) m' 15,000.00

Screw bh 500.00

Dynabolt bh 2,000.00

Plat bracing m' 7,500.00

Aspal curah (AC 60-70) kg 2,000.00

Aspal drum kemas kg 10,000.00

Grease kg 65,000.00

Kawat galvanis kg 15,000.00

Tang pemotong kawat bh 19,000.00

Palu besar/bodem bh 65,000.00

Pisau besar bh 45,000.00

Keranjang bh 16,000.00

Gergaji bh 28,600.00

Ganco bh 55,000.00

Sabit besar bh 40,000.00

KOSONG Kansteen 10.20.40 K-225 ( m' 47,500.00

KOSONG Kansteen 15.25.40 K-225 ( m' 90,000.00

KOSONG Kansteen 15.30.50 K-225 ( m' 88,000.00

KOSONG Kansteen 18.30.60 K-225 ( m' 92,000.00

KOSONG Keramik trotoar uk. 33,3 x m2 90,000.00

KOSONG Keramik mozaik 80 x 80 cm unit 748,400.00

KOSONG Main Hole (cast iron) 70 x unit 1,316,700.00

Box Culvert U 150.150.120 pcs 8,334,000.00 0.00 8,334,000.00CU 150.20.120 cm. (terpas -

KOSONG Woodplank (20 x 400 x 1) lbr 60,000.00

KOSONG Woodplank (30 x 400 x 1) lbr 105,800.00

Handle Pintu stainless steel bh 115,000.00

KOSONG Selang Pemadam bh 3,550,000.00

KOSONG Nozzle bh 9,000,000.00

KOSONG Fire man Shirt bh 9,000,000.00

KOSONG 36000

G280
PU:
G283
PU:

5400Sepatu Safeti bh 2,750,000.00

Helm Pemadam bh 7,500,000.00

"x" Conection bh 4,500,000.00

Mandor org/hr 70,000.00

Kepala Tukang Batu org/hr 70,000.00

Kepala Tukang Kayu org/hr 70,000.00

Kepala Tukang Cat org/hr 70,000.00

Kepala Tukang Besi org/hr 70,000.00

Kepala Tukang Gali org/hr 70,000.00

Kepala Tukang Listrik org/hr 70,000.00

Kepala Tukang Pipa org/hr 70,000.00

Kepala Tukang Taman org/hr 70,000.00

Tukang Batu org/hr 60,000.00

Tukang Kayu org/hr 60,000.00

Tukang Cat org/hr 60,000.00

Tukang Gali org/hr 60,000.00

Tukang Besi org/hr 60,000.00

Tukang Politur org/hr 60,000.00

Tukang Aspal org/hr 60,000.00

Tukang Pipa org/hr 60,000.00

Tukang Listrik org/hr 60,000.00

Tukang Taman org/hr 60,000.00

Pembantu Tukang Batu org/hr 40,000.00

Pembantu Tukang Kayu org/hr 40,000.00

Pembantu Tukang Cat org/hr 40,000.00

Pembantu Tukang Besi org/hr 40,000.00

Pembantu Tukang Listrik org/hr 40,000.00

Pembantu Tukang Pipa org/hr 40,000.00

Tukang Bongkar org/hr 35,000.00

Pekerja/Buruh tak terampil org/hr 35,000.00

Buruh terampil org/hr 45,000.00

Pengemudi/Sopir org/hr 50,000.00

Pembantu Sopir org/hr 35,000.00

Masinis org/hr 50,000.00

Pembantu Masinis org/hr 35,000.00

Mekanik org/hr 50,000.00

Pembantu Mekanik org/hr 35,000.00

Operator org/hr 50,000.00

Pembantu Operator org/hr 35,000.00

Penjaga malam org/hr 50,000.00

Penjaga api org/hr 35,000.00

95.24 1944000

72,000 12,000 120,000 20,000 180,000 30,000 330,000 55,000

M2 95000 95400 114000BH 400 1600OH 95400 6201

121801OH 50,000.00 3,750.00 OH 65,000.00 6,500.00 OH 70,000.00 1,400.00 OH 75,000.00 187.50

11,837.50 133638.5

3.99

0.66

16000

25,487.00 2,548.70 509.74 1,019.48 2,548.70 32,113.6219,327.00 1,932.70 386.54 773.08 1,932.70 24,352.0211,704.00 1,170.40 234.08 468.16 1,170.40 14,747.04

400.00 40.00 8.00 16.00 40.00 504.001,500.00 150.00 30.00 60.00 150.00 1,890.006,000.00 600.00 120.00 240.00 600.00 7,560.00

pertamina 524.00 8,780.00 4,600,720.00 5,842,914.40 5,842.91 6,315.91

pertamina 674.91 8,780.00 5,925,709.80 7,525,651.45 7,525.65 7,998.65

0.00

A.6. HARGA SATUAN PEKERJAAN PERSIAPAN

1 Mengukur dan memasang bouwplank per 1 m'/unit

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga Satuan

Total (Rp)Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Bahan :Kayu 5/7 m3 0.0120 6,500,000.00 78,000.00Paku Biasa 2 - 5" kg 0.0200 17,000.00 340.00Kayu Meranti (papan) m3 0.0070 2,500,000.00 17,500.00Tenaga Kerja :Pekerja oh 0.1000 50,000.00 5,000.00Tukang Kayu oh 0.1000 70,000.00 7,000.00Kepala Tukang oh 0.0100 0.00 0.00Mandor oh 0.0050 0.00 0.00

0.2150 95,840.00 12,000.00 107,840.00Harga per satuan pekerjaan dibulatkan 107,840.00

2 Membersihkan 1 m2 lapangan dan peralatan

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga Satuan

Total (Rp)Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Tenaga Kerja :Pekerja oh 0.1000 50,000.00 5,000.00Mandor oh 0.0050 65,000.00 325.00

0.1050 5,325.00 5,325.00Harga per satuan pekerjaan dibulatkan 5,325.00

3 Membuat 1 m2 stegger dari bambu ukuran (40 x 50 x 20) cm

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga Satuan

Total (Rp)Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Bahan :Bambu dia 06 - 10/600 cm btg 1.0000 21,200.00 21,200.00Tali Ijuk kg 0.2500 27,500.00 6,875.00Tenaga Kerja :Pekerja oh 0.2500 50,000.00 12,500.00Tukang Kayu oh 0.0170 65,000.00 1,105.00Kepala Tukang oh 0.0020 0.00 0.00Mandor oh 0.0130 0.00 0.00

0.2820 28,075.00 13,605.00 41,680.00Harga per satuan pekerjaan dibulatkan 41,680.00

4 Membongkar 1 m3 beton bertulang

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga Satuan

Total (Rp)Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Tenaga Kerja :Pekerja oh 6.6670 50,000.00 333,350.00Mandor oh 0.3330 65,000.00 21,645.00

7.0000 354,995.00 354,995.00Harga per satuan pekerjaan dibulatkan 354,995.00

5 Membongkar 1 m3 dinding tembok bata merah

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga Satuan

Total (Rp)Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Tenaga Kerja :Pekerja oh 6.6670 50,000.00 333,350.00Mandor oh 0.0330 65,000.00 2,145.00

6.7000 335,495.00 335,495.00Harga per satuan pekerjaan dibulatkan 335,495.00

B.6. HARGA SATUAN PEKERJAAN TANAH

1. Menggali 1 m3 tanah biasa sedalam 1 m B.6.-1#2

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga Satuan

Total (Rp)Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Tenaga Kerja :Pekerja oh 0.7500 50,000.00 37,500.00Mandor oh 0.0250 0.00 0.00

0.7750 37,500.00 37,500.00Harga per satuan pekerjaan dibulatkan 37,500.00

2. Menggali 1 m3 tanah biasa sedalam 2 m

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga Satuan

Total (Rp)Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Tenaga Kerja :Pekerja oh 0.9000 50,000.00 45,000.00Mandor oh 0.0450 65,000.00 2,925.00

0.9450 47,925.00 47,925.00Harga per satuan pekerjaan dibulatkan 47,925.00

4. Menggali 1 m3 tanah keras sedalam 1 m

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga Satuan

Total (Rp)Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Tenaga Kerja :Pekerja oh 1.0000 50,000.00 50,000.00Mandor oh 0.0320 65,000.00 2,080.00

1.0320 52,080.00 52,080.00Harga per satuan pekerjaan dibulatkan 52,080.00

11. Mengurug 1 m3 pasir urug

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga Satuan

Total (Rp)Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Bahan :Pasir Urug m3 1.2000 60,000.00 72,000.00Tenaga Kerja :Pekerja oh 0.3000 50,000.00 15,000.00Mandor oh 0.0100 0.00 0.00

0.3100 72,000.00 15,000.00 87,000.00Harga per satuan pekerjaan dibulatkan 87,000.00

15.a. Mengurug 1 m3 tanah urug

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga Satuan

Total (Rp)Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Bahan :Tanah Urug m3 1.2000 55,000.00 66,000.00Tenaga Kerja :Pekerja oh 0.2500 50,000.00 12,500.00Mandor oh 0.0250 0.00 0.00

0.2750 66,000.00 12,500.00 78,500.00Harga per satuan pekerjaan dibulatkan 78,500.00

C.6. HARGA SATUAN PEKERJAAN PONDASI

1 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga Satuan

Total (Rp)Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Bahan :Batu Belah 15/20 cm m3 1.1000 180,000.00 198,000.00PC kg 163.0000 1,750.00 285,250.00Pasir Pasang m3 0.5200 130,000.00 67,600.00Tenaga Kerja :Pekerja oh 1.5000 50,000.00 75,000.00Tukang Batu oh 0.7500 65,000.00 48,750.00Kepala Tukang oh 0.0750 0.00 0.00Mandor oh 0.0750 0.00 0.00

2.4000 550,850.00 123,750.00 674,600.00Harga per satuan pekerjaan dibulatkan 674,600.00

2 Memasang 1 m3 batu kosong (aanstamping)

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga Satuan

Total (Rp)Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Bahan :Batu Belah 15/20 cm m3 1.2000 180,000.00 216,000.00Pasir Urug m3 0.4320 65,000.00 28,080.00Tenaga Kerja :Pekerja oh 0.7800 50,000.00 39,000.00Tukang Batu oh 0.3900 65,000.00 25,350.00Kepala Tukang oh 0.0390 0.00 0.00Mandor oh 0.0390 0.00 0.00

1.2480 244,080.00 64,350.00 308,430.00Harga per satuan pekerjaan dibulatkan 308,430.00

40 4.075

D.6. HARGA SATUAN PEKERJAAN DINDING D.6.-1#2

1 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4 PP

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga Satuan

Total (Rp)Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Bahan :Bata Merah bh 140.0000 600.00 84,000.00PC kg 26.5500 1,750.00 46,462.50Pasir Pasang m3 0.0930 130,000.00 12,090.00Tenaga Kerja :Pekerja oh 0.6000 50,000.00 30,000.00Tukang Batu oh 0.2000 65,000.00 13,000.00Kepala Tukang oh 0.0200 0.00 0.00Mandor oh 0.0300 0.00 0.00

0.8500 142,552.50 43,000.00 185,552.50Harga per satuan pekerjaan dibulatkan 185,552.00

2 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 4 PP

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga Satuan

Total (Rp)Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Bahan :Bata Merah bh 70.0000 600.00 42,000.00PC kg 11.5000 1,750.00 20,125.00Pasir Pasang m3 0.0430 130,000.00 5,590.00Tenaga Kerja :Pekerja oh 0.3000 50,000.00 15,000.00Tukang Batu oh 0.1000 65,000.00 6,500.00Kepala Tukang oh 0.0100 0.00 0.00Mandor oh 0.0150 0.00 0.00

0.4250 67,715.00 21,500.00 89,215.00Harga per satuan pekerjaan dibulatkan 89,215.00

E.6. HARGA SATUAN PEKERJAAN PLESTERAN E.6.-1#2

1 Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga Satuan

Total (Rp)Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Bahan :PC kg 7.7760 1,750.00 13,608.00Pasir Pasang m3 0.0230 130,000.00 2,990.00Tenaga Kerja :Pekerja oh 0.3000 50,000.00 15,000.00Tukang Batu oh 0.1500 65,000.00 9,750.00Kepala Tukang oh 0.0150 0.00 0.00Mandor oh 0.0150 0.00 0.00

0.4800 16,598.00 24,750.00 41,348.00Harga per satuan pekerjaan dibulatkan 41,348.00

2 Memasang 1 m2 finishing siar pasangan batu kali adukan 1 PC : 2 PP

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga Satuan

Total (Rp)Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Bahan :PC kg 6.3400 1,750.00 11,095.00Pasir Pasang m3 0.0120 130,000.00 1,560.00Tenaga Kerja :Pekerja oh 0.3000 50,000.00 15,000.00Tukang Batu oh 0.1500 65,000.00 9,750.00Kepala Tukang oh 0.0150 0.00 0.00Mandor oh 0.0150 0.00 0.00

0.4800 12,655.00 24,750.00 37,405.00Harga per satuan pekerjaan dibulatkan 37,405.00

3 Memasang 1 m2 acian

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga Satuan

Total (Rp)Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Bahan :PC kg 3.2500 1,750.00 5,687.50Tenaga Kerja :Pekerja oh 0.2000 50,000.00 10,000.00Tukang Batu oh 0.1000 65,000.00 6,500.00Kepala Tukang oh 0.0100 0.00 0.00Mandor oh 0.0100 0.00 0.00

0.3200 5,687.50 16,500.00 22,187.50Harga per satuan pekerjaan dibulatkan 22,187.00

86

8.17

6. HARGA SATUAN PEKERJAAN BETON

1

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga Satuan

Total (Rp)Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Bahan :PC kg 326.0000 1,750.00 570,500.00Pasir Beton m3 0.5429 130,000.00 70,571.43Koral (maks 30 mm) m3 0.7622 250,000.00 190,555.56Air ltr 215.0000 25.00 5,375.00Tenaga Kerja :Pekerja oh 1.6500 50,000.00 82,500.00Tukang Batu oh 0.2750 65,000.00 17,875.00Kepala Tukang oh 0.0280 0.00 0.00Mandor oh 0.0830 0.00 0.00

2.0360 837,001.98 100,375.00 937,376.98Harga per satuan pekerjaan dibulatkan 937,376.00

2 Membuat 1 m3 beton bertulang (200 kg besi + bekisting)

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga Satuan

Total (Rp)Bahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp)

Bahan :Kayu Kelas III m3 0.2700 2,500,000.00 675,000.00Paku 5 - 12 cm kg 2.0000 17,000.00 34,000.00Minyak Bekisting ltr 0.6000 0.00 0.00Besi Beton polos kg 210.0000 13,000.00 2,730,000.00Kawat Beton kg 3.0000 25,000.00 75,000.00PC kg 336.0000 1,750.00 588,000.00Pasir Beton m3 0.5400 130,000.00 70,200.00Koral m3 0.8100 250,000.00 202,500.00Tenaga Kerja :Pekerja oh 5.6500 50,000.00 282,500.00Tukang Batu oh 0.2750 65,000.00 17,875.00Tukang Kayu oh 1.5600 0.00 0.00Tukang Besi oh 1.4000 0.00 0.00Kepala Tukang oh 0.3230 0.00 0.00Mandor oh 0.2830 0.00 0.00

9.4910 4,374,700.00 300,375.00 4,675,075.00Harga per satuan pekerjaan dibulatkan 4,675,075.00

Membuat 1 m3 beton mutu f'c = 14.5 MPa (K 175), slump (12 + 2) cm, w/c = 0,66

F.6. HARGA SATUAN PEKERJAAN KAYU F.6.-1#8

1 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas III (Kruing)

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Papan Kayu m3 0.0400 6,500,000.00 260,000.00Lem Kayu kg 0.5000 40,000.00 20,000.00Tenaga Kerja :Pekerja oh 1.0000 50,000.00 50,000.00Tukang Kayu oh 3.0000 65,000.00 195,000.00Kepala Tukang oh 0.3000 0.00 0.00Mandor oh 0.0500 0.00 0.00

4.3500 280,000.00 245,000.00 525,000.00Harga per satuan pekerjaan dibulatkan 525,000.00

2 Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu kelas III (Kruing)

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Balok Kayu m3 1.1000 6,500,000.00 7,150,000.00Besi Strip tebal 5 mm kg 15.0000 19,400.00 291,000.00Paku 12 cm kg 5.6000 17,000.00 95,200.00Tenaga Kerja :Pekerja oh 4.0000 50,000.00 200,000.00Tukang Kayu oh 12.0000 65,000.00 780,000.00Kepala Tukang oh 1.2000 0.00 0.00Mandor oh 0.2000 0.00 0.00

17.4000 7,536,200.00 980,000.00 8,516,200.00Harga per satuan pekerjaan dibulatkan 8,516,200.00

3 Memasang 1 m3 konstruksi gordeng, kayu kelas III (Kruing)

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Balok Kayu m3 1.1000 6,500,000.00 7,150,000.00Besi Strip tebal 5 mm kg 15.0000 19,400.00 291,000.00Paku 12 cm kg 3.0000 17,000.00 51,000.00Tenaga Kerja :Pekerja oh 2.4000 50,000.00 120,000.00Tukang Kayu oh 7.2000 65,000.00 468,000.00Kepala Tukang oh 0.7200 0.00 0.00Mandor oh 0.1200 0.00 0.00

10.4400 7,492,000.00 588,000.00 8,080,000.00Harga per satuan pekerjaan dibulatkan 8,080,000.00

4 Memasang 1 m2 rangka atap genteng kodok, kayu kelas II (Kruing)

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Kaso-kaso (5 x 7) cm m3 0.0140 6,500,000.00 91,000.00Reng (3 x 4) cm m3 0.0036 6,500,000.00 23,400.00Paku 5 dan 10 cm kg 0.2500 17,000.00 4,250.00Tenaga Kerja :Pekerja oh 0.1000 50,000.00 5,000.00Tukang Kayu oh 0.1000 65,000.00 6,500.00Kepala Tukang oh 0.0100 70,000.00 700.00Mandor oh 0.0050 75,000.00 375.00

0.2150 118,650.00 12,575.00 131,225.00Harga per satuan pekerjaan dibulatkan 131,225.00

5 Memasang 1 m2 rangka atap genteng kodok, kayu meranti

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Kaso-kaso (5 x 7) cm m3 0.0140 4,620,000.00 64,680.00Reng (3 x 4) cm m3 0.0036 4,620,000.00 16,632.00Paku 5 dan 10 cm kg 0.2500 17,000.00 4,250.00Tenaga Kerja :Pekerja oh 0.1000 50,000.00 5,000.00Tukang Kayu oh 0.1000 65,000.00 6,500.00Kepala Tukang oh 0.0100 70,000.00 700.00Mandor oh 0.0050 75,000.00 375.00

0.2150 85,562.00 12,575.00 98,137.00Harga per satuan pekerjaan dibulatkan 98,137.00

6 Memasang 1 m2 rangka langit-langit (100 x 100) cm, kayu kelas III (Kruing)

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Kaso-kaso (4 x 6) cm m3 0.0108 6,500,000.00 70,200.00Paku 7 sampai 10 cm kg 0.2000 17,000.00 3,400.00Tenaga Kerja :Pekerja oh 0.1500 50,000.00 7,500.00Tukang Kayu oh 0.3000 65,000.00 19,500.00Kepala Tukang oh 0.0300 70,000.00 2,100.00Mandor oh 0.0750 75,000.00 5,625.00

0.5550 73,600.00 34,725.00 108,325.00Harga per satuan pekerjaan dibulatkan 108,325.00

7 Memasang 1 m' listplank woodplank ukuran lebar 30 tebal 1 cm F.6.-7#8

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Papan wood plank m' 1.1000 27,000.00 29,700.00Paku 5 dan 7 cm kg 0.0500 17,000.00 850.00Tenaga Kerja :Pekerja oh 0.1000 50,000.00 5,000.00Tukang Kayu oh 0.2000 65,000.00 13,000.00Kepala Tukang oh 0.0200 0.00 0.00Mandor oh 0.0050 0.00 0.00

0.3250 30,550.00 18,000.00 48,550.00Harga per satuan pekerjaan dibulatkan 48,550.00

8 Memasang 1 m' listplank woodplank ukuran lebar 20 tebal 1 cm

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Papan wood plank m' 1.1000 22,000.00 24,200.00Paku 5 dan 7 cm kg 0.0500 17,000.00 850.00Tenaga Kerja :Pekerja oh 0.1000 50,000.00 5,000.00Tukang Kayu oh 0.2000 65,000.00 13,000.00Kepala Tukang oh 0.0200 0.00 0.00Mandor oh 0.0050 0.00 0.00

0.3250 25,050.00 18,000.00 43,050.00Harga per satuan pekerjaan dibulatkan 43,050.00

G.6. HARGA SATUAN PEKERJAAN PENUTUP ATAP G.6.-1#3

1 Memasang 1 m2 genteng kodok/glazzur

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Genteng Kodok bh 25.0000 2,500.00 62,500.00Tenaga Kerja :Pekerja oh 0.1500 50,000.00 7,500.00Tukang kayu oh 0.0750 65,000.00 4,875.00Kepala Tukang oh 0.0080 0.00 0.00Mandor oh 0.0080 0.00 0.00

0.2410 62,500.00 12,375.00 74,875.00Harga per satuan pekerjaan dibulatkan 74,875.00

2 Memasang 1 m' genteng bubung kodok/glazzur

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Genteng Bubung Kodok bh 5.0000 6,000.00 30,000.00Semen Portland kg 10.8000 1,750.00 18,900.00Pasir Pasang m3 0.0320 130,000.00 4,160.00Tenaga Kerja :Pekerja oh 0.4000 50,000.00 20,000.00Tukang Kayu oh 0.2000 65,000.00 13,000.00Kepala Tukang oh 0.0200 0.00 0.00Mandor oh 0.0020 0.00 0.00

0.6220 53,060.00 33,000.00 86,060.00Harga per satuan pekerjaan dibulatkan 86,060.00

3 Memasang 1 m2 atap asbes gelombang (3,0 x 1,05) m x 4 mm G.6.-2#3

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Asbes Gelombang lbr 0.3500 95,000.00 33,250.00Paku Pancing kg 0.1200 25,000.00 3,000.00Tenaga Kerja :Pekerja oh 0.1400 50,000.00 7,000.00Tukang Kayu oh 0.0670 65,000.00 4,355.00Kepala Tukang oh 0.0070 0.00 0.00Mandor oh 0.0070 0.00 0.00

0.2210 36,250.00 11,355.00 47,605.00Harga per satuan pekerjaan dibulatkan 47,605.00

4 Memasang 1 m2 atap asbes gelombang (3,00 x 1,08) m x 6 mm

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Asbes Gelombang lbr 0.3400 110,000.00 37,400.00Paku Pancing kg 0.1200 25,000.00 3,000.00Tenaga Kerja :Pekerja oh 0.1400 50,000.00 7,000.00Tukang Kayu oh 0.0700 65,000.00 4,550.00Kepala Tukang oh 0.0070 0.00 0.00Mandor oh 0.0070 0.00 0.00

0.2240 40,400.00 11,550.00 51,950.00Harga per satuan pekerjaan dibulatkan 51,950.00

5 Memasang 1 m' bubung stel gelombang 1,05 m

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Bubung Stel Gelombang lbr 2.1000 18,700.00 39,270.00Paku Sekrup bh 4.0000 400.00 1,600.00Tenaga Kerja :Pekerja oh 0.0840 50,000.00 4,200.00Tukang Kayu oh 0.1250 65,000.00 8,125.00Kepala Tukang oh 0.0130 0.00 0.00Mandor oh 0.0040 0.00 0.00

0.2260 40,870.00 12,325.00 53,195.00Harga per satuan pekerjaan dibulatkan 53,195.00

6 Memasang 1 m2 atap seng gelombang

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Seng Gelombang bjls lbr 0.7000 35,000.00 24,500.00Paku Biasa kg 0.0200 17,000.00 340.00Tenaga Kerja :Pekerja oh 0.1200 50,000.00 6,000.00Tukang Kayu oh 0.0600 65,000.00 3,900.00Kepala Tukang oh 0.0060 0.00 0.00Mandor oh 0.0060 0.00 0.00

0.1920 24,840.00 9,900.00 34,740.00Harga per satuan pekerjaan dibulatkan 34,740.00

7 Memasang 1 m2 atap nok seng

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Seng Plat lbr 0.4000 47,520.00 19,008.00Kayu 5/7 m3 0.0040 6,500,000.00 26,000.00Paku Biasa kg 0.0600 17,000.00 1,020.00Tenaga Kerja :Pekerja oh 0.1250 50,000.00 6,250.00Tukang Kayu oh 0.2500 65,000.00 16,250.00Kepala Tukang oh 0.0250 0.00 0.00Mandor oh 0.0060 0.00 0.00

0.4060 46,028.00 22,500.00 68,528.00Harga per satuan pekerjaan dibulatkan 68,528.00

12,375.0012,375.00

H.6. HARGA SATUAN PEKERJAAN LANGIT-LANGIT H.6.-1#2

1 Memasang 1 m2 langit-langit asbes semen, tebal 4 mm rangka kayu meranti

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Kaso-kaso (4 x 6) cm m3 0.0108 6,500,000.00 70,200.00Paku 7 sampai 10 cm kg 0.2000 17,000.00 3,400.00Asbes Semen m2 1.1000 20,000.00 22,000.00Paku Tripleks kg 0.0100 17,000.00 170.00Tenaga Kerja :Pekerja oh 0.1800 50,000.00 9,000.00Tukang Kayu oh 0.3200 65,000.00 20,800.00Kepala Tukang oh 0.0320 0.00 0.00Mandor oh 0.0790 0.00 0.00

0.6110 95,770.00 29,800.00 125,570.00Harga per satuan pekerjaan dibulatkan 125,570.00

2 Memasang 1 m' list langit-langit kayu profil H.6.-2#2

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :List Kayu Profil m' 1.0500 6,000.00 6,300.00Paku kg 0.0100 17,000.00 170.00Tenaga Kerja :Pekerja oh 0.0500 50,000.00 2,500.00Tukang Kayu oh 0.0500 65,000.00 3,250.00Kepala Tukang oh 0.0050 0.00 0.00Mandor oh 0.0030 0.00 0.00

0.1080 6,470.00 5,750.00 12,220.00Harga per satuan pekerjaan dibulatkan 12,220.00

I.6. HARGA SATUAN PEKERJAAN PIPA DAN SANITASI I.6.-1#7

1. Memasang 1 bh kloset duduk/monoblok

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Kloset Duduk/Monoblok bh 1.0000 1,000,000.00 1,000,000.00Perlengkapan 6 % set 0.0600 60,000.00 3,600.00Tenaga Kerja :Pekerja oh 3.3000 50,000.00 165,000.00Tukang Batu oh 1.1000 65,000.00 71,500.00Kepala Tukang oh 0.0110 0.00 0.00Mandor oh 0.1600 0.00 0.00

4.5710 1,003,600.00 236,500.00 1,240,100.00Harga per satuan pekerjaan dibulatkan 1,240,100.00

2. Memasang 1 bh kloset jongkok porselen

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Kloset Jongkok Porselen bh 1.0000 125,000.00 125,000.00Semen Portland kg 6.0000 1,750.00 10,500.00Pasir Pasang m3 0.0100 130,000.00 1,300.00Tenaga Kerja :Pekerja oh 1.0000 50,000.00 50,000.00Tukang Batu oh 1.5000 65,000.00 97,500.00Kepala Tukang oh 0.1500 0.00 0.00Mandor oh 0.1600 0.00 0.00

2.8100 136,800.00 147,500.00 284,300.00Harga per satuan pekerjaan dibulatkan 284,300.00

3 Memasang 1 bh bak mandi fibreglass vol. 0,30 m3

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Bak fibreglass bh 1.0000 425,000.00 425,000.00Perlengkapan set 0.1800 76,500.00 13,770.00Tenaga Kerja :Pekerja oh 1.8000 50,000.00 90,000.00Tukang Batu oh 2.7000 65,000.00 175,500.00Kepala Tukang oh 0.5400 0.00 0.00Mandor oh 0.1100 0.00 0.00

5.1500 438,770.00 265,500.00 704,270.00Harga per satuan pekerjaan dibulatkan 704,270.00

4

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Pipa Beton dia 20 cm bh 1.1000 55,000.00 60,500.00Batu Bata bh 10.0000 600.00 6,000.00Semen Potland kg 3.9200 1,750.00 6,860.00Pasir Pasang m3 0.0560 130,000.00 7,280.00Pasir Urug m3 0.0240 65,000.00 1,560.00Tenaga Kerja :Pekerja oh 0.1400 50,000.00 7,000.00Tukang Batu oh 0.0700 65,000.00 4,550.00Kepala Tukang oh 0.0070 0.00 0.00Mandor oh 0.0070 0.00 0.00

0.2240 82,200.00 11,550.00 93,750.00Harga per satuan pekerjaan dibulatkan 93,750.00

5 I.6.-3#7

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Pipa Beton dia 30 cm bh 1.1000 75,000.00 82,500.00Batu Bata bh 12.0000 600.00 7,200.00Semen Potland kg 10.3000 1,750.00 18,025.00Pasir Pasang m3 0.0610 130,000.00 7,930.00Pasir Urug m3 0.0690 65,000.00 4,485.00Tenaga Kerja :Pekerja oh 0.3800 50,000.00 19,000.00Tukang Batu oh 0.1900 65,000.00 12,350.00Kepala Tukang oh 0.0190 0.00 0.00Mandor oh 0.0190 0.00 0.00

Memasang 1 m' pipa beton F 20 cm

Memasang 1 m' pipa beton F 30 cm

0.6080 120,140.00 31,350.00 151,490.00Harga per satuan pekerjaan dibulatkan 151,490.00

6

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Pipa Beton dia 40 cm bh 1.1000 85,000.00 93,500.00Batu Bata bh 17.0000 600.00 10,200.00Semen Potland kg 10.3000 1,750.00 18,025.00Pasir Pasang m3 0.0610 130,000.00 7,930.00Pasir Urug m3 0.0690 65,000.00 4,485.00Tenaga Kerja :Pekerja oh 0.3800 50,000.00 19,000.00Tukang Batu oh 0.1900 65,000.00 12,350.00Kepala Tukang oh 0.0190 0.00 0.00Mandor oh 0.0190 0.00 0.00

0.6080 134,140.00 31,350.00 165,490.00Harga per satuan pekerjaan dibulatkan 165,490.00

7

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Pipa Beton dia 50 cm bh 2.1000 95,000.00 199,500.00Batu Bata bh 20.0000 600.00 12,000.00Semen Potland kg 10.3000 1,750.00 18,025.00Pasir Pasang m3 0.0610 130,000.00 7,930.00Pasir Urug m3 0.0690 65,000.00 4,485.00Tenaga Kerja :Pekerja oh 0.3800 50,000.00 19,000.00Tukang Batu oh 0.1900 65,000.00 12,350.00Kepala Tukang oh 0.0190 0.00 0.00Mandor oh 0.0190 0.00 0.00

0.6080 241,940.00 31,350.00 273,290.00Harga per satuan pekerjaan dibulatkan 273,290.00

8 Memasang 1 bh bak kontrol pasangan batu bata (30 x 30) cm t 35 cm

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Batu Bata bh 108.7500 600.00 65,250.00Semen Potland kg 44.0000 1,750.00 77,000.00Pasir Pasang m3 0.0700 130,000.00 9,100.00Batu Kerikil m3 0.0700 250,000.00 17,500.00Besi Beton kg 1.6000 11,700.00 18,720.00Pasir Beton m3 0.0600 130,000.00 7,800.00Tenaga Kerja :Pekerja oh 3.2000 50,000.00 160,000.00Tukang Batu oh 1.0150 65,000.00 65,975.00Kepala Tukang oh 0.0015 0.00 0.00Mandor oh 0.0160 0.00 0.00

4.2325 195,370.00 225,975.00 421,345.00Harga per satuan pekerjaan dibulatkan 421,345.00

9 Memasang 1 bh bak kontrol pasangan batu bata (45 x 45) cm t 50 cm I.6.-4#7

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Batu Bata bh 187.5000 600.00 112,500.00Semen Potland kg 77.0000 1,750.00 134,750.00Pasir Pasang m3 0.1300 130,000.00 16,900.00Batu Kerikil m3 0.0200 250,000.00 5,000.00Besi Beton kg 2.6000 11,700.00 30,420.00Pasir Beton m3 0.0900 130,000.00 11,700.00Tenaga Kerja :Pekerja oh 3.2000 50,000.00 160,000.00Tukang Batu oh 1.0150 65,000.00 65,975.00Kepala Tukang oh 0.0015 0.00 0.00Mandor oh 0.0160 0.00 0.00

4.2325 311,270.00 225,975.00 537,245.00Harga per satuan pekerjaan dibulatkan 537,245.00

Memasang 1 m' pipa beton F 40 cm

Memasang 1 m' pipa beton F 50 cm

9 Memasang 1 m' pipa galvanis dia 2" I.6.-5#7

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Pipa Galvanis m' 1.2000 100,000.00 120,000.00Perlengkapan set 0.3500 35,000.00 12,250.00Tenaga Kerja :Pekerja oh 0.1080 50,000.00 5,400.00Tukang Besi oh 0.1800 65,000.00 11,700.00Kepala Tukang oh 0.0180 0.00 0.00Mandor oh 0.0054 0.00 0.00

0.3114 132,250.00 17,100.00 149,350.00Harga per satuan pekerjaan dibulatkan 149,350.00

10 Memasang 1 m' pipa galvanis dia 3"

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Pipa Galvanis m' 1.2000 150,000.00 180,000.00Perlengkapan set 0.3500 52,500.00 18,375.00Tenaga Kerja :Pekerja oh 0.1080 50,000.00 5,400.00Tukang Besi oh 0.1800 65,000.00 11,700.00Kepala Tukang oh 0.0180 0.00 0.00Mandor oh 0.0054 0.00 0.00

0.3114 198,375.00 17,100.00 215,475.00Harga per satuan pekerjaan dibulatkan 215,475.00

11 Memasang 1 m' pipa PVC tipe D dia 3"

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Pipa PVC m' 1.2000 26,250.00 31,500.00Perlengkapan set 0.3500 9,187.50 3,215.63Tenaga Kerja :Pekerja oh 0.0810 50,000.00 4,050.00Tukang Pipa oh 0.1350 65,000.00 8,775.00Kepala Tukang oh 0.0135 0.00 0.00Mandor oh 0.0041 0.00 0.00

0.2336 34,715.63 12,825.00 47,540.63Harga per satuan pekerjaan dibulatkan 47,540.00

12 Memasang 1 m' pipa PVC tipe D dia 4" I.6.-7#7

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Pipa PVC m' 1.2000 37,500.00 45,000.00Perlengkapan set 0.3500 13,125.00 4,593.75Tenaga Kerja :Pekerja oh 0.0810 50,000.00 4,050.00Tukang Pipa oh 0.1350 65,000.00 8,775.00Kepala Tukang oh 0.0135 0.00 0.00Mandor oh 0.0041 0.00 0.00

0.2336 49,593.75 12,825.00 62,418.75Harga per satuan pekerjaan dibulatkan 62,418.00

13 Memasang 1 m' pipa PVC tipe D dia 5"

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Pipa PVC m' 1.2000 62,500.00 75,000.00Perlengkapan set 0.3500 21,875.00 7,656.25Tenaga Kerja :Pekerja oh 0.0810 50,000.00 4,050.00Tukang Pipa oh 0.1350 65,000.00 8,775.00Kepala Tukang oh 0.0135 0.00 0.00Mandor oh 0.0041 0.00 0.00

0.2336 82,656.25 12,825.00 95,481.25

Harga per satuan pekerjaan dibulatkan 95,481.00

`

J.6. HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM J.6.-1#3

1 Memasang 1 m' kusen pintu/jendela aluminium

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Profil Aluminium m' 1.1000 119,000.00 130,900.00Skrup Fixer bh 2.0000 600.00 1,200.00Sealant tube 0.0600 24,200.00 1,452.00Pipa hollow aluminium (1 x 3) cm btg 1.1000 0.00 0.00Paku skrup 1" bh 4.0000 400.00 1,600.00Tenaga Kerja :Pekerja oh 0.0430 50,000.00 2,150.00Tukang Besi oh 0.0430 65,000.00 2,795.00Kepala Tukang oh 0.0043 0.00 0.00Mandor oh 0.0021 0.00 0.00

0.0924 135,152.00 4,945.00 140,097.00Harga per satuan pekerjaan dibulatkan 140,097.00

2 Memasang 1 m2 pintu aluminium strip lebar 8 cm

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Profil Aluminium m' 4.4000 119,000.00 523,600.00Aluminium Strip m' 14.6000 0.00 0.00Tenaga Kerja :Pekerja oh 0.0850 50,000.00 4,250.00Tukang Besi oh 0.0850 65,000.00 5,525.00Kepala Tukang oh 0.0085 0.00 0.00Mandor oh 0.0042 0.00 0.00

0.1827 523,600.00 9,775.00 533,375.00Harga per satuan pekerjaan dibulatkan 533,375.00

3 Memasang 1 m2 pintu kaca rangka aluminium

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Pintu Aluminium m' 4.4000 119,000.00 523,600.00Profil Kaca m' 4.5000 5,500.00 24,750.00Kaca 5 mm m2 1.1000 100,900.00 110,990.00Sealant tube 0.2700 24,200.00 6,534.00Tenaga Kerja :Pekerja oh 0.0850 50,000.00 4,250.00Tukang Besi oh 0.0850 65,000.00 5,525.00Kepala Tukang oh 0.0080 0.00 0.00Mandor oh 0.0040 0.00 0.00

0.1820 665,874.00 9,775.00 675,649.00Harga per satuan pekerjaan dibulatkan 675,649.00

4 Memasang 1 m2 jendela kaca rangka aluminium J.6.-3#3

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Jendela Aluminium m' 4.4000 119,000.00 523,600.00Profil Kaca m' 4.5000 5,500.00 24,750.00Kaca 5 mm m2 1.1000 100,900.00 110,990.00Sealant tube 0.2700 24,200.00 6,534.00Tenaga Kerja :Pekerja oh 0.0850 50,000.00 4,250.00Tukang Besi oh 0.0850 65,000.00 5,525.00Kepala Tukang oh 0.0080 0.00 0.00Mandor oh 0.0040 0.00 0.00

0.1820 665,874.00 9,775.00 675,649.00Harga per satuan pekerjaan dibulatkan 675,649.00

5 Memasang 1 m' talang datar/jurai seng bjls 28 lebar 90 cm

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Seng Plat m' 1.0500 40,000.00 42,000.00Paku kg 0.0150 17,000.00 255.00Papan Kayu III m3 0.0190 2,500,000.00 47,500.00Tenaga Kerja :Pekerja oh 0.2000 50,000.00 10,000.00Tukang Besi oh 0.4000 65,000.00 26,000.00Kepala Tukang oh 0.0250 0.00 0.00

Mandor oh 0.0100 0.00 0.000.6350 89,755.00 36,000.00 125,755.00

Harga per satuan pekerjaan dibulatkan 125,755.00

K.6. HARGA SATUAN PEKERJAAN PENGUNCI DAN KACA K.6.-1#3

5. Memasang 1 buah engsel pintu

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Engsel Pintu bh 1.0000 16,450.00 16,450.00Tenaga Kerja :Pekerja oh 0.0150 50,000.00 750.00Tukang Kayu oh 0.1250 65,000.00 8,125.00Kepala Tukang oh 0.0130 0.00 0.00Mandor oh 0.0075 0.00 0.00

0.1605 16,450.00 8,875.00 25,325.00Harga per satuan pekerjaan dibulatkan 25,325.00

6. Memasang 1 buah engsel jendela

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Engsel Jendela bh 1.0000 7,500.00 7,500.00Tenaga Kerja :Pekerja oh 0.0100 50,000.00 500.00Tukang Kayu oh 0.1000 65,000.00 6,500.00Kepala Tukang oh 0.0100 0.00 0.00Mandor oh 0.0005 0.00 0.00

0.1205 7,500.00 7,000.00 14,500.00Harga per satuan pekerjaan dibulatkan 14,500.00

9. Memasang 1 buah kait angin

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Kait Angin bh 1.0000 15,000.00 15,000.00Tenaga Kerja :Pekerja oh 0.0100 50,000.00 500.00Tukang Kayu oh 0.1000 65,000.00 6,500.00Kepala Tukang oh 0.0100 0.00 0.00Mandor oh 0.0005 0.00 0.00

0.1205 15,000.00 7,000.00 22,000.00Harga per satuan pekerjaan dibulatkan 22,000.00

11. Memasang 1 buah kunci selot K.6.-2#3

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Kunci Selot bh 1.0000 120,000.00 120,000.00Tenaga Kerja :Pekerja oh 0.0200 50,000.00 1,000.00Tukang Kayu oh 0.5000 65,000.00 32,500.00Kepala Tukang oh 0.0500 0.00 0.00Mandor oh 0.0010 0.00 0.00

0.5710 120,000.00 33,500.00 153,500.00Harga per satuan pekerjaan dibulatkan 153,500.00

15.a. Memasang 1 buah grendel K.6.-3#3

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Grendel bh 1.0000 27,500.00 27,500.00Tenaga Kerja :Pekerja oh 0.0069 50,000.00 345.00Tukang Kayu oh 0.1000 65,000.00 6,500.00Kepala Tukang oh 0.0100 70,000.00 700.00Mandor oh 0.0002 75,000.00 15.00

0.1171 27,500.00 7,560.00 35,060.00Harga per satuan pekerjaan dibulatkan 35,060.00

16. Memasang 1 m2 kaca tebal 3 mm

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Kaca 3 mm m2 1.1000 89,900.00 98,890.00Tenaga Kerja :Pekerja oh 0.1600 50,000.00 8,000.00Tukang Kayu oh 0.1600 65,000.00 10,400.00Kepala Tukang oh 0.0160 70,000.00 1,120.00

Mandor oh 0.0080 75,000.00 600.000.3440 98,890.00 20,120.00 119,010.00

Harga per satuan pekerjaan dibulatkan 119,010.00

17. Memasang 1 m2 kaca tebal 5 mm

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Kaca 5 mm m2 1.1000 100,900.00 110,990.00Tenaga Kerja :Pekerja oh 0.1600 50,000.00 8,000.00Tukang Kayu oh 0.1600 65,000.00 10,400.00Kepala Tukang oh 0.0160 70,000.00 1,120.00Mandor oh 0.0080 75,000.00 600.00

0.3440 110,990.00 20,120.00 131,110.00Harga per satuan pekerjaan dibulatkan 131,110.00

17.a. Memasang 1 m2 kaca rayband tebal 5 mm

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Kaca Rayband 5 mm m2 1.1000 119,900.00 131,890.00Tenaga Kerja :Pekerja oh 0.1600 50,000.00 8,000.00Tukang Kayu oh 0.1600 65,000.00 10,400.00Kepala Tukang oh 0.0160 70,000.00 1,120.00Mandor oh 0.0080 75,000.00 600.00

0.3440 131,890.00 20,120.00 152,010.00Harga per satuan pekerjaan dibulatkan 152,010.00

L.6. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING L.6.-1#3

1 Memasang per 1 m2 lantai keramik ukuran (40 x 40) cm

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Ubin Keramik m2 1.0500 70,000.00 73,500.00PC kg 8.1900 1,750.00 14,332.50Pasir Pasang m3 0.0450 130,000.00 5,850.00Semen Warna kg 1.6200 13,600.00 22,032.00Tenaga Kerja :Pekerja oh 0.7000 50,000.00 35,000.00Tukang Batu oh 0.3500 65,000.00 22,750.00Kepala Tukang oh 0.0350 0.00 0.00Mandor oh 0.0350 0.00 0.00

1.1200 115,714.50 57,750.00 173,464.50Harga per satuan pekerjaan dibulatkan 173,464.00

2 Memasang per 1 m2 lantai keramik ukuran (30 x 30) cm L.6.-2#3

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Ubin Keramik m2 1.0500 60,000.00 63,000.00PC kg 10.0000 1,750.00 17,500.00Pasir Pasang m3 0.0450 130,000.00 5,850.00Semen Warna kg 1.5000 13,600.00 20,400.00Tenaga Kerja :Pekerja oh 0.7000 50,000.00 35,000.00Tukang Batu oh 0.3500 65,000.00 22,750.00Kepala Tukang oh 0.0350 0.00 0.00Mandor oh 0.0350 0.00 0.00

1.1200 106,750.00 57,750.00 164,500.00Harga per satuan pekerjaan dibulatkan 164,500.00

3 Memasang per 1 m2 lantai keramik ukuran (20 x 20) cm

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Ubin Keramik m2 1.0500 55,000.00 57,750.00PC kg 10.4000 1,750.00 18,200.00Pasir Pasang m3 0.0450 130,000.00 5,850.00Semen Warna kg 1.6200 13,600.00 22,032.00Tenaga Kerja :Pekerja oh 0.7000 50,000.00 35,000.00Tukang Batu oh 0.3500 65,000.00 22,750.00Kepala Tukang oh 0.0350 0.00 0.00Mandor oh 0.0350 0.00 0.00

1.1200 103,832.00 57,750.00 161,582.00Harga per satuan pekerjaan dibulatkan 161,582.00

M.6. HARGA SATUAN PEKERJAAN PENGECATAN M.6.-1#2

1 Mengecat 1 m2 bidang kayu baru (1 lapis plamir dan cat dasar, 2 lapis cat penutup)

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Cat Meni kg 0.2000 40,000.00 8,000.00Plamir kg 0.1500 25,000.00 3,750.00Cat Dasar kg 0.1700 70,000.00 11,900.00Cat Penutup (2 kali) kg 0.2600 70,000.00 18,200.00Tenaga Kerja :Pekerja oh 0.0700 50,000.00 3,500.00Tukang Cat oh 0.0090 65,000.00 585.00Kepala Tukang oh 0.0060 0.00 0.00Mandor oh 0.0025 0.00 0.00

0.0875 41,850.00 4,085.00 45,935.00Harga per satuan pekerjaan dibulatkan 45,935.00

2 Mengecat 1 m2 bidang tembok baru (1 lapis plamir dan cat dasar, 2 lapis cat penutup)

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Plamir kg 0.1000 18,800.00 1,880.00Cat Dasar kg 0.1000 20,000.00 2,000.00Cat Penutup (2 kali) kg 0.2600 20,000.00 5,200.00Tenaga Kerja :Pekerja oh 0.0200 50,000.00 1,000.00Tukang Cat oh 0.0630 65,000.00 4,095.00Kepala Tukang oh 0.0063 0.00 0.00Mandor oh 0.0025 0.00 0.00

0.0918 9,080.00 5,095.00 14,175.00Harga per satuan pekerjaan dibulatkan 14,175.00

HARGA SATUAN PEKERJAAN LAIN-LAIN Ls.-1#5

1 Memasang 1 m2 paving blok abu-abu persegi Ls.-2#5

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Paving Blok Abu-abu persegi m2 1.0000 47,000.00 47,000.00Pasir Pasang m3 0.0800 130,000.00 10,400.00Tenaga Kerja :Pekerja oh 0.2000 50,000.00 10,000.00Tukang Batu oh 0.1000 65,000.00 6,500.00Kepala Tukang oh 0.0100 0.00 0.00Mandor oh 0.0200 0.00 0.00

0.3300 57,400.00 16,500.00 73,900.00Harga per satuan pekerjaan dibulatkan 73,900.00

2 Memasang 1 m2 paving blok abu-abu persegi K-300

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Paving Blok abu-abu persegi K-300 m2 1.0000 65,000.00 65,000.00Pasir Pasang m3 0.0800 130,000.00 10,400.00Sewa Alat Pemadatan m2 0.0600 2,500.00 150.00Tenaga Kerja :Pekerja oh 0.2000 50,000.00 10,000.00Tukang Batu oh 0.1000 65,000.00 6,500.00Kepala Tukang oh 0.0100 0.00 0.00Mandor oh 0.0200 0.00 0.00

0.3300 75,550.00 16,500.00 92,050.00Harga per satuan pekerjaan dibulatkan 92,050.00

3 Memasang 1 m2 atap polycarbonate rangka stainless steel

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Polycarbonate + Rangka m2 1.0000 715,000.00 715,000.00Tenaga Kerja :Pekerja oh 0.7000 50,000.00 35,000.00Tukang Besi oh 0.3500 65,000.00 22,750.00Kepala Tukang oh 0.0350 0.00 0.00Mandor oh 0.0700 0.00 0.00

1.1550 715,000.00 57,750.00 772,750.00Harga per satuan pekerjaan dibulatkan 772,750.00

4 Memasang 1 m2 pagar besi Ls.-4#5

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Pagar Besi m2 1.0000 517,000.00 517,000.00PC kg 25.0000 1,750.00 43,750.00Pasir Pasang m3 0.0500 130,000.00 6,500.00Tenaga Kerja :Pekerja oh 0.3056 50,000.00 15,280.00Tukang Batu oh 0.3056 65,000.00 19,864.00Kepala Tukang oh 0.0306 0.00 0.00Mandor oh 0.0031 0.00 0.00

0.6449 567,250.00 35,144.00 602,394.00Harga per satuan pekerjaan dibulatkan 602,394.00

5 Memasang 1 m2 pintu pagar besi

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Pintu Pagar Besi m2 1.0000 550,000.00 550,000.00PC kg 2.0000 1,750.00 3,500.00Pasir Pasang m3 0.0040 130,000.00 520.00Tenaga Kerja :Pekerja oh 0.2578 50,000.00 12,890.00Tukang Batu oh 0.2578 65,000.00 16,757.00Kepala Tukang oh 0.0258 0.00 0.00Mandor oh 0.0026 0.00 0.00

0.5440 554,020.00 29,647.00 583,667.00

Harga per satuan pekerjaan dibulatkan 583,667.00

6 Ls.-5#5

U r a i a n Satuan IndeksHarga Satuan Harga Satuan Jumlah Harga SatuanBahan (Rp) Upah (Rp) Bahan (Rp) Upah (Rp) Total (Rp)

Bahan :Profil C 75.100 m' 3.6800 34,375.00 126,500.00Profil C 75.75 m' 4.3700 26,125.00 114,166.25Reng m' 5.9700 16,500.00 98,505.00Screw bh 25.0000 500.00 12,500.00Dynabolt bh 0.5000 1,700.00 850.00Plat Bracing m' 0.4000 7,500.00 3,000.00Tenaga Kerja :Ongkos Pasang m2 0.9000 25,000.00 22,500.00

355,521.25 22,500.00 378,021.25Harga per satuan pekerjaan dibulatkan 378,021.00

Memasang 1 m2 rangka atap baja ringan mutu tinggi model pelana/perisai sederhana sudut kemiringan 30o bentang > 16 m'.

41600 201600

HARGA SATUAN PEKERJAAN BINA MARGA BMg-1#4

Ls. Pasang plat grill, per 1 m2Besi siku L 40.40.3 mm m1 4.0000 15,000.00 60,000.00Besi plat 20.3 mm m1 38.0000 12,000.00 456,000.00Ongkos las ttk 80.0000 2,096.00 167,680.00

516,000.00 167,680.00 683,680.00Harga Per Satuan Pekerjaan Dibulatkan 683,680.00

K O D E

ANALISA BIAYA PERALATAN E.052

PROPINSI : JAWA TIMUR KOTA : KEDIRI

JENIS ALAT : Wheel Loader

HARGA : Rp. 1,003,000,000.00 TENAGA = 115 HP

UMUR KERJA : 8 tahun = 12.000 jam FAKTOR ( CRF ) = 0.20483

A. BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam)

1. Depresiasi :

Jam/Tahun

= 0,90 x 1.003.000.000 x 0,20483 = Rp. 123,266.69

1,500.00

2. Lain-lain :

Asuransi 3% th + PPn 10% = 3,30 % x Harga

Jam/Tahun

= 0,033 x 1,003,000,000.00 = Rp. 22,066.00

1,500.00

Sub Total = Rp. 145,332.69

B. BIAYA OPERASI (OPERATION COSTS) : (Rp./jam)

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 /liter/HP/jam.

Bensin = 0.170 /liter/HP/jam.

Pelumas = 0.006 /liter/HP/jam.

Harga : Solar/Minyak Diesel = Rp. 13,750.00 /liter

Bensin = Rp. 0.00 /liter

Pelumas = Rp. 36,300.00 /liter

Bahan Bakar Diesel = 0.160 x 115 x Rp. 13,750.00 = Rp. 253,000.00

Bahan Bakar Bensin = 0.170 x 115 x Rp. 0.00 = Rp. 0.00

Pelumas = 0.006 x 115 x Rp. 36,300.00 = Rp. 25,047.00

Perbaikan dan Spareparts = 0.800 x Rp. 123,266.69 = Rp. 98,613.36

( 80% x depresiasi )

Sub Total = Rp. 376,660.36

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B =Rp. 145,332.69 + Rp. 376,660.36 = Rp. 521,993.05 /jam

Dibulatkan = Rp. 521,993.00 /jam

90 % x Alat x (CRF) x 1

K O D E

ANALISA BIAYA PERALATAN E.080

PROPINSI : JAWA TIMUR KOTA : KEDIRI

JENIS ALAT : Wheel Roller Steel 6 - 8 ton

HARGA : Rp. 319,000,000.00 TENAGA = 37 HP

UMUR KERJA : 10 tahun = 15.000 jam FAKTOR ( CRF ) = 0.18062

A. BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam)

1. Depresiasi :

Jam/Tahun

= 0,90 x 319.000.000 x 0,18062 = Rp. 34,570.67

1,500.00

2. Lain-lain :

Asuransi 3% th + PPn 10% = 3,30 % x Harga

Jam/Tahun

= 0,033 x 319,000,000.00 = Rp. 7,018.00

1,500.00

Sub Total = Rp. 41,588.67

B. BIAYA OPERASI (OPERATION COSTS) : (Rp./jam)

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 /liter/HP/jam.

Bensin = 0.170 /liter/HP/jam.

Pelumas = 0.006 /liter/HP/jam.

Harga : Solar/Minyak Diesel = Rp. 13,750.00 /liter

Bensin = Rp. /liter

Pelumas = Rp. 36,300.00 /liter

Bahan Bakar Diesel = 0.160 x 37 x Rp. 13,750.00 = Rp. 81,400.00

Bahan Bakar Bensin = 0.170 x 37 x Rp. 0.00 = Rp. 0.00

Pelumas = 0.006 x 37 x Rp. 36,300.00 = Rp. 8,058.60

Perbaikan dan Spareparts = 0.800 x Rp. 34,570.67 = Rp. 27,656.53

( 80% x depresiasi )

Sub Total = Rp. 117,115.13

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B =Rp. 41,588.67 + Rp. 117,115.13 = Rp. 158,703.80 /jam

Dibulatkan = Rp. 158,703.00 /jam

90 % x Alat x (CRF) x 1

K O D E

ANALISA BIAYA PERALATAN E.081

PROPINSI : JAWA TIMUR KOTA : KEDIRI

JENIS ALAT : Tandem Roller 6-8 ton

HARGA : Rp. 605,000,000.00 TENAGA = 40 HP

UMUR KERJA : 10 tahun = 15.000 jam FAKTOR ( CRF ) = 0.18062

A. BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam)

1. Depresiasi :

Jam/Tahun

= 0,90 x 605.000.000 x 0,18062 = Rp. 65,565.06

1,500.00

2. Lain-lain :

Asuransi 3% th + PPn 10% = 3,30 % x Harga

Jam/Tahun

= 0,033 x 605,000,000.00 = Rp. 13,310.00

1,500.00

Sub Total = Rp. 78,875.06

B. BIAYA OPERASI (OPERATION COSTS) : (Rp./jam)

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 /liter/HP/jam.

Bensin = 0.170 /liter/HP/jam.

Pelumas = 0.006 /liter/HP/jam.

Harga : Solar/Minyak Diesel = Rp. 13,750.00 /liter

Bensin = Rp. 0.00 /liter

Pelumas = Rp. 36,300.00 /liter

Bahan Bakar Diesel = 0.160 x 40 x Rp. 13,750.00 = Rp. 88,000.00

Bahan Bakar Bensin = 0.170 x 40 x Rp. 0.00 = Rp. 0.00

Pelumas = 0.006 x 40 x Rp. 36,300.00 = Rp. 8,712.00

Perbaikan dan Spareparts = 0.800 x Rp. 65,565.06 = Rp. 52,452.05

( 80% x depresiasi )

Sub Total = Rp. 149,164.05

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B =Rp. 78,875.06 + Rp. 149,164.05 = Rp. 228,039.11 /jam

Dibulatkan = Rp. 228,039.00 /jam

90 % x Alat x (CRF) x 1

K O D E

ANALISA BIAYA PERALATAN E.084

PROPINSI : JAWA TIMUR KOTA : KEDIRI

JENIS ALAT : Pneumatic Tire Roller 8-15 ton

HARGA : Rp. 330,500,000.00 TENAGA = 95 HP

UMUR KERJA : 10 tahun = 15.000 jam FAKTOR ( CRF ) = 0.18062

A. BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam)

1. Depresiasi :

Jam/Tahun

= 0,90 x 330.500.000 x 0,18062 = Rp. 35,816.95

1,500.00

2. Lain-lain :

Asuransi 3% th + PPn 10% = 3,30 % x Harga

Jam/Tahun

= 0,033 x 330,500,000.00 = Rp. 7,271.00

1,500.00

Sub Total = Rp. 43,087.95

B. BIAYA OPERASI (OPERATION COSTS) : (Rp./jam)

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 /liter/HP/jam.

Bensin = 0.170 /liter/HP/jam.

Pelumas = 0.006 /liter/HP/jam.

Harga : Solar/Minyak Diesel = Rp. 13,750.00 /liter

Bensin = Rp. 0.00 /liter

Pelumas = Rp. 36,300.00 /liter

Bahan Bakar Diesel = 0.160 x 95 x Rp. 13,750.00 = Rp. 209,000.00

Bahan Bakar Bensin = 0.170 x 95 x Rp. 0.00 = Rp. 0.00

Pelumas = 0.006 x 95 x Rp. 36,300.00 = Rp. 20,691.00

Perbaikan dan Spareparts = 0.800 x Rp. 35,816.95 = Rp. 28,653.56

( 80% x depresiasi )

Sub Total = Rp. 258,344.56

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B =Rp. 43,087.95 + Rp. 258,344.56 = Rp. 301,432.50 /jam

Dibulatkan = Rp. 301,432.00 /jam

90 % x Alat x (CRF) x 1

K O D E

ANALISA BIAYA PERALATAN E.087

PROPINSI : JAWA TIMUR KOTA : KEDIRI

JENIS ALAT : Vibrator Roller

HARGA : Rp. 876,500,000.00 TENAGA = 109 HP

UMUR KERJA : 10 tahun = 15.000 jam FAKTOR ( CRF ) = 0.18062

A. BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam)

1. Depresiasi :

Jam/Tahun

= 0,90 x 876.500.000 x 0,20483 = Rp. 94,988.06

1,500.00

2. Lain-lain :

Asuransi 3% th + PPn 10% = 3,30 % x Harga

Jam/Tahun

= 0,033 x 876,500,000.00 = Rp. 19,283.00

1,500.00

Sub Total = Rp. 114,271.06

B. BIAYA OPERASI (OPERATION COSTS) : (Rp./jam)

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 /liter/HP/jam.

Bensin = 0.170 /liter/HP/jam.

Pelumas = 0.006 /liter/HP/jam.

Harga : Solar/Minyak Diesel = Rp. 13,750.00 /liter

Bensin = Rp. 0.00 /liter

Pelumas = Rp. 36,300.00 /liter

Bahan Bakar Diesel = 0.078 x 109 x Rp. 13,750.00 = Rp. 116,453.11

Bahan Bakar Bensin = 0.102 x 109 x Rp. 0.00 = Rp. 0.00

Pelumas = 0.004 x 109 x Rp. 36,300.00 = Rp. 14,244.12

Perbaikan dan Spareparts = 0.800 x Rp. 94,988.06 = Rp. 75,990.45

( 80% x depresiasi )

Sub Total = Rp. 206,687.68

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B =Rp. 114,271.06 + Rp. 206,687.68 = Rp. 320,958.74 /jam

Dibulatkan = Rp. 320,958.00 /jam

90 % x Alat x (CRF) x 1

K O D E

ANALISA BIAYA PERALATAN E.153

PROPINSI : JAWA TIMUR KOTA : KEDIRI

JENIS ALAT : Asphalt Sprayer 1.000 ltr

HARGA : Rp. 23,000,000.00 TENAGA = 25 HP

UMUR KERJA : 6 tahun = 7.200 jam FAKTOR ( CRF ) = 0.24668

A. BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam)

1. Depresiasi :

Jam/Tahun

= 0,90 x 23.000.000 x 0,24668 = Rp. 4,255.23

1,200.00

2. Lain-lain :

Asuransi 3% th + PPn 10% = 3,30 % x Harga

Jam/Tahun

= 0,033 x 23,000,000.00 = Rp. 632.50

1,200.00

Sub Total = Rp. 4,887.73

B. BIAYA OPERASI (OPERATION COSTS) : (Rp./jam)

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 /liter/HP/jam.

Bensin = 0.170 /liter/HP/jam.

Pelumas = 0.006 /liter/HP/jam.

Harga : Solar/Minyak Diesel = Rp. 13,750.00 /liter

Bensin = Rp. 0.00 /liter

Pelumas = Rp. 36,300.00 /liter

Bahan Bakar Diesel = 0.160 x 25 x Rp. 13,750.00 = Rp. 55,000.00

Bahan Bakar Bensin = 0.170 x 25 x Rp. 0.00 = Rp. 0.00

Pelumas = 0.006 x 25 x Rp. 36,300.00 = Rp. 5,445.00

Perbaikan dan Spareparts = 0.800 x Rp. 4,255.23 = Rp. 3,404.18

( 80% x depresiasi )

Sub Total = Rp. 63,849.18

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B =Rp. 4,887.73 + Rp. 63,849.18 = Rp. 68,736.91 /jam

Dibulatkan = Rp. 68,736.00 /jam

90 % x Alat x (CRF) x 1

K O D E

ANALISA BIAYA PERALATAN E.155

PROPINSI : JAWA TIMUR KOTA : KEDIRI

JENIS ALAT : Asphalt Mixing Plant 30 ton

HARGA : Rp. 1,575,000,000.00 TENAGA = 150 HP

UMUR KERJA : 1 tahun = 1.200 jam ( B )

BIAYA PASTI PER JAM KERJA

1. Nilai sisa = = Rp. 157,500,000.00 ( C )

2. Faktor angsuran Modal = = 0.607 = Rp. 0.199 ( D )

i = 13% 3.046

3. Biaya Pasti Per Jam = { (B-C)D + (0,20C) }

W

{ ( Rp. 1.575.000.000 - Rp. 157.500.000 ) x 0,199 + 0,20 x (Rp. 157.500.000 ) } = Rp. 261,318.75 ( E )

1200

BIAYA OPERASI PER JAM KERJA

1. Spare Part dan Ban = ( 12,5 s/d 17,5 ) B

100 W

= 15 x Rp. 1,575,000,000.00 = Rp. 196,875.00 ( F )

100 x 1.200

2. Work Shop = ( 6,25 s/d 8,75 ) B

100 W

= 7,5 x Rp. 1,575,000,000.00 = Rp. 98,437.50 ( G )

100 x 1.200

3. Bahan Bakar dan Pelumas

12% s/d 15% HP x Harga Bahan bakar

0,0035 s/d 0,0060 x HP x harga Pelumas + Solar untuk Pembakaran

( 0.1300 x 150 x Rp. 13,750.00 ) = Rp. 268,125.00

( 0.0040 x 150 x Rp. 36,300.00 ) = Rp. 21,780.00

( 17.0000 x 30 x Rp. 13,750.00 ) = Rp. 7,012,500.00

= Rp. 7,302,405.00 ( H )

4. Operator dan Driver = Rp. 65,000.00 x 1/8 = Rp. 8,125.00 ( J )

Pembantu Operator = Rp. 45,000.00 x 1/8 = Rp. 5,625.00 ( K )

5. Biaya Langsung = F+G+H+J+K F = Rp. 196,875.00

G = Rp. 98,437.50

H = Rp. 7,302,405.00

J = Rp. 8,125.00

K = Rp. 5,625.00

= Rp. 7,611,467.50 ( T )

BIAYA OPERASI TOTAL PER JAM = TC = E-T

i( 1 + i ) A

( 1 + i )A - 1A

= Rp. 261,318.75 + Rp. 7,611,467.50 = Rp. 7,872,786.25

Dibulatkan = Rp. 7,872,786.00

K O D E

ANALISA BIAYA PERALATAN E.157

PROPINSI : JAWA TIMUR KOTA : KEDIRI

JENIS ALAT : Asphalt Finisher

HARGA : Rp. 534,500,000.00 TENAGA = 30 HP

UMUR KERJA : 7 tahun = 8.400 jam FAKTOR ( CRF ) = 0.2226

A. BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam)

1. Depresiasi :

Jam/Tahun

= 0,90 x 534.500.000 x 0,2226 = Rp. 89,234.78

1,200.00

2. Lain-lain :

Asuransi 3% th + PPn 10% = 3,30 % x Harga

Jam/Tahun

= 0,033 x 534,500,000.00 = Rp. 14,698.75

1,200.00

Sub Total = Rp. 103,933.53

B. BIAYA OPERASI (OPERATION COSTS) : (Rp./jam)

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 /liter/HP/jam.

Bensin = 0.170 /liter/HP/jam.

Pelumas = 0.006 /liter/HP/jam.

Harga : Solar/Minyak Diesel = Rp. 13,750.00 /liter

Bensin = Rp. 0.00 /liter

Pelumas = Rp. 36,300.00 /liter

Bahan Bakar Diesel = 0.160 x 30 x Rp. 13,750.00 = Rp. 66,000.00

Bahan Bakar Bensin = 0.170 x 30 x Rp. 0.00 = Rp. 0.00

Pelumas = 0.006 x 30 x Rp. 36,300.00 = Rp. 6,534.00

Perbaikan dan Spareparts = 0.800 x Rp. 89,234.78 = Rp. 71,387.82

( 80% x depresiasi )

Sub Total = Rp. 143,921.82

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B =Rp. 103,933.53 + Rp. 143,921.82 = Rp. 247,855.35 /jam

Dibulatkan = Rp. 247,855.00 /jam

90 % x Alat x (CRF) x 1

K O D E

ANALISA BIAYA PERALATAN E.182

PROPINSI : JAWA TIMUR KOTA : KEDIRI

JENIS ALAT : Water Tank Truck

HARGA : Rp. 275,000,000.00 TENAGA = 115 HP

UMUR KERJA : 6 tahun = 9.000 jam FAKTOR ( CRF ) = 0.24668

A. BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam)

1. Depresiasi :

Jam/Tahun

= 0,90 x 275.000.000 x 0,20483 = Rp. 40,702.20

1,500.00

2. Lain-lain :

Asuransi 3% th + PPn 10% = 3,30 % x Harga

Jam/Tahun

= 0,033 x 275,000,000.00 = Rp. 6,050.00

1,500.00

Sub Total = Rp. 46,752.20

B. BIAYA OPERASI (OPERATION COSTS) : (Rp./jam)

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 /liter/HP/jam.

Bensin = 0.170 /liter/HP/jam.

Pelumas = 0.006 /liter/HP/jam.

Harga : Solar/Minyak Diesel = Rp. 13,750.00 /liter

Bensin = Rp. 0.00 /liter

Pelumas = Rp. 36,300.00 /liter

Bahan Bakar Diesel = 0.078 x 115 x Rp. 13,750.00 = Rp. 122,863.38

Bahan Bakar Bensin = 0.102 x 115 x Rp. 0.00 = Rp. 0.00

Pelumas = 0.004 x 115 x Rp. 36,300.00 = Rp. 15,028.20

Perbaikan dan Spareparts = 0.800 x Rp. 40,702.20 = Rp. 32,561.76

( 80% x depresiasi )

Sub Total = Rp. 170,453.34

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B =Rp. 46,752.20 + Rp. 170,453.34 = Rp. 217,205.54 /jam

90 % x Alat x (CRF) x 1

Dibulatkan = Rp. 217,205.00 /jam

K O D E

ANALISA BIAYA PERALATAN E.212

PROPINSI : JAWA TIMUR KOTA : KEDIRI

JENIS ALAT : Dump Truck 5 ton

HARGA : Rp. 116,000,000.00 TENAGA = 145 HP

UMUR KERJA : 6 tahun 9.000 jam FAKTOR ( CRF ) = 0.24668

A. BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam)

1. Depresiasi :

Jam/Tahun

= 0,90 x 116.000.000 x 0,20483 = Rp. 17,168.93

1,500.00

2. Lain-lain :

Asuransi 3% th + PPn 10% = 3,30 % x Harga

Jam/Tahun

= 0,033 x 116,000,000.00 = Rp. 2,552.00

1,500.00

Sub Total = Rp. 19,720.93

B. BIAYA OPERASI (OPERATION COSTS) : (Rp./jam)

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 /liter/HP/jam.

Bensin = 0.170 /liter/HP/jam.

Pelumas = 0.006 /liter/HP/jam.

Harga : Solar/Minyak Diesel = Rp. 13,750.00 /liter

Bensin = Rp. 0.00 /liter

Pelumas = Rp. 36,300.00 /liter

Bahan Bakar Diesel = 0.160 x 145 x Rp. 13,750.00 = Rp. 319,000.00

Bahan Bakar Bensin = 0.170 x 145 x Rp. 0.00 = Rp. 0.00

Pelumas = 0.006 x 145 x Rp. 36,300.00 = Rp. 31,581.00

Perbaikan dan Spareparts = 0.800 x Rp. 17,168.93 = Rp. 13,735.14

( 80% x depresiasi )

Sub Total = Rp. 364,316.14

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

90 % x Alat x (CRF) x 1

A + B =Rp. 19,720.93 + Rp. 364,316.14 = Rp. 384,037.07 /jam

Dibulatkan = Rp. 384,037.00 /jam

K O D E

ANALISA BIAYA PERALATAN E.301

PROPINSI : JAWA TIMUR KOTA : KEDIRI

JENIS ALAT :

HARGA : Rp. 141,500,000.00 TENAGA = 35 HP

UMUR KERJA : 8 tahun = 6.000 jam FAKTOR ( CRF ) = 0.20483

A. BIAYA PEMILIKAN (OWNERSHIP COSTS) : (Rp./jam)

1. Depresiasi :

Jam/Tahun

= 0,90 x 141.500.000 x 0,20483 = Rp. 34,780.13

750.00

2. Lain-lain :

Asuransi 3% th + PPn 10% = 3,30 % x Harga

Jam/Tahun

= 0,033 x 141,500,000.00 = Rp. 6,226.00

750.00

Sub Total = Rp. 41,006.13

B. BIAYA OPERASI (OPERATION COSTS) : (Rp./jam)

Kebutuhan bahan bakar dan pelumas tiap HP :

Diesel = 0.160 /liter/HP/jam.

Bensin = 0.170 /liter/HP/jam.

Pelumas = 0.006 /liter/HP/jam.

Harga : Solar/Minyak Diesel = Rp. 13,750.00 /liter

Bensin = Rp. 0.00 /liter

Pelumas = Rp. 36,300.00 /liter

Bahan Bakar Diesel = 0.160 x 35 x Rp. 13,750.00 = Rp. 77,000.00

Bahan Bakar Bensin = 0.170 x 35 x Rp. 0.00 = Rp. 0.00

Pelumas = 0.006 x 35 x Rp. 36,300.00 = Rp. 7,623.00

Perbaikan dan Spareparts = 0.800 x Rp. 34,780.13 = Rp. 27,824.11

( 80% x depresiasi )

Sub Total = Rp. 112,447.11

Compressor Air 210 m3

90 % x Alat x (CRF) x 1

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :

A + B =Rp. 41,006.13 + Rp. 112,447.11 = Rp. 153,453.24 /jam

Dibulatkan = Rp. 153,453.00 /jam

A N A L I S A H A R G A S A T U A N KODE

LAPIS TIPIS ASPAL PASIR (LATASIR)

PRODUKSI DAN SUPLAI (MENGGUNAKAN ALAT) K.020

PROPINSI KODE KOTA KODE DISIAPKAN OLEH : TANGGAL :

JAWA TIMUR ( ) KEDIRI ( )

PROSES : ANGGAPAN :

1. Semua material dikirim pemasok 1. LATASIR dibuat di AMP produksi 100 ton/hari

2. Loader menjaga bin tetap penuh 2. Aspal dipanaskan lebih dahulu agar aspal sudah siap saat dimulai

3. Produksi AMP 100 ton/hari 3. Biaya produksi termasuk pengangkutan s/d 10 km dari AMP

4. Dump Truck dimuati dan ditutupi 4. Produksi dimuat kedalam dumptruck 5 ton dan dikirim ke tempat pekerjaan

terpal untuk mempertahankan suhu 5. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

5. Dump Truck membongkar langsung 6. Spek B.M. No. 12/PT/B/1983 dan revisi Spesifikasi Umum Maret 1989 - Buku 3

kedalam mesin penghampar aspal

P E K E R J A VOL. HARI KODE TOTAL VOL. Upah BIAYA SUB JUMLAH

Hari-Orang Rp./hari/orang (Rp.) (Rp.)

P Mandor 1 1 L061 1 75,000.00 75,000.00

E Operator Terampil 3 1 L081 3 65,000.00 195,000.00

K Pembantu Operator 3 1 L083 3 45,000.00 135,000.00

E Sopir 4 1 L091 4 65,000.00 260,000.00

R Pembantu Sopir 4 1 L099 4 45,000.00 180,000.00

J Buruh Tak Terampil 6 1 L101 6 50,000.00 300,000.00

A Buruh Terampil 3 1 L106 3 50,000.00 150,000.00

1,295,000.00

M A T E R I A L Satuan KODE Total HARGA SAT. BIAYA SUB JUMLAH

Volume (Rp.) (Rp.) (Rp.)

M Pasir ayak untuk beton M041 45.00 130,000.00 5,850,000.00

A Aspal curah kg M061A 10,000.00 11,200.00 112,000,000.00

T Semen 50 kg M080A 98.00 2,187.50 214,375.00

E Kapur M081 6.00 440,000.00 2,640,000.00

R Alat bantu (set @ 3 alat) set M170 0.06 1,295,000.00 77,700.00

I Batu pecah mesin 0,5/1 cm M026 1.50 253,000.00 379,500.00

A

L

121,161,575.00

P E R A L A T A N Jumlah Hari KODE Jam HARGA BIAYA SUB JUMLAH

Alat Kerja Kerja (Rp.) (Rp.) (Rp.)

P Wheel Loader 115 HP 1 1 E052 5.00 521,993.00 2,609,965.00

E Mesin Penyampur Aspal 30 t/j 1 1 E155 5.00 7,872,786.00 39,363,930.00

R Dump Truck 5 ton/145 HP 4 1 E212 24.00 384,037.00 9,216,888.00

A

L

A

T

A

N

51,190,783.00

JUMLAH (Rp.) 173,647,358.00

Volume 100 Satuan ton Harga Satuan 1,736,473.58 per ton

Dibulatkan 1,736,473.00 per ton

m3

m3

m3

A N A L I S A H A R G A S A T U A N KODE

LAPIS TIPIS ASPAL BETON (LATASTON)

PRODUKSI DAN SUPLAI (MENGGUNAKAN ALAT) K.035

PROPINSI KODE KOTA KODE DISIAPKAN OLEH : TANGGAL :

JAWA TIMUR ( ) KEDIRI ( )

PROSES : ANGGAPAN :

1. Semua material dikirim pemasok 1. HRS dibuat di AMP produksi 100 ton/hari

2. Loader menjaga bin tetap penuh 2. Agregat pecah tersaring disuplai termurah

3. Produksi AMP 100 ton/hari 3. Aspal dipanaskan lebih dahulu agar aspal sudah siap saat dimulai

4. Dump Truck dimuati dan ditutupi 4. Produksi dimuat kedalam dumptruck 5 ton dan dikirim ke penghampar aspal

terpal untuk mempertahankan suhu 5. Biaya produksi termasuk pengangkutan sejauh 10 km dari AMP

5. Dump Truck membongkar langsung 6. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

kedalam mesin penghampar aspal 7. Spek B.M. No. 12/PT/B/1983 (tabel 3.3)dan revisi Spesifikasi Umum Maret 1989 - Buku 3

P E K E R J A VOL. HARI KODE TOTAL VOL. Upah BIAYA SUB JUMLAH

Hari-Orang Rp./hari/orang (Rp.) (Rp.)

P Mandor 1 1 L061 1 75,000.00 75,000.00

E Operator Terampil 3 1 L081 3 65,000.00 195,000.00

K Pembantu Operator 3 1 L083 3 45,000.00 135,000.00

E Sopir 4 1 L091 4 65,000.00 260,000.00

R Pembantu Sopir 4 1 L099 4 45,000.00 180,000.00

J Buruh Tak Terampil 6 1 L101 6 50,000.00 300,000.00

A Buruh Terampil 3 1 L106 3 50,000.00 150,000.00

1,295,000.00

M A T E R I A L Satuan KODE Total HARGA SAT. BIAYA SUB JUMLAH

Volume (Rp.) (Rp.) (Rp.)

M Pasir ayak untuk beton M041 31.00 130,000.00 4,030,000.00

A Aspal curah kg M061A 7,300.00 11,200.00 81,760,000.00

T Semen 50 kg M080A 90.00 2,187.50 196,875.00

E Kapur M081 1.00 440,000.00 440,000.00

R Alat bantu (set @ 3 alat) set M170 0.06 1,295,000.00 77,700.00

I Batu pecah mesin 0,5/1 cm M026 22.50 253,000.00 5,692,500.00

A

L

92,197,075.00

P E R A L A T A N Jumlah Hari KODE Jam HARGA BIAYA SUB JUMLAH

Alat Kerja Kerja (Rp.) (Rp.) (Rp.)

P Wheel Loader 115 HP 1 1 E052 5.00 521,993.00 2,609,965.00

E Mesin Penyampur Aspal 30 t/j 1 1 E155 5.00 7,872,786.00 39,363,930.00

R Dump Truck 5 ton/145 HP 4 1 E212 24.00 384,037.00 9,216,888.00

A

L

A

T

A

N

51,190,783.00

JUMLAH (Rp.) 144,682,858.00

Volume 100 Satuan ton Harga Satuan 1,446,828.58 per ton

Dibulatkan 1,446,828.00 per ton

m3

m3

m3

A N A L I S A H A R G A S A T U A N KODE

ASPAL BETON (LASTON)

PRODUKSI DAN SUPLAI (MENGGUNAKAN ALAT) K.040

PROPINSI KODE KOTA KODE DISIAPKAN OLEH : TANGGAL :

JAWA TIMUR ( ) KEDIRI ( )

PROSES : ANGGAPAN :

1. Semua material dikirim pemasok 1. HRS dibuat di AMP produksi 100 ton/hari

2. Loader menjaga bin tetap penuh 2. Agregat pecah tersaring disuplai termurah

3. Produksi AMP 100 ton/hari 3. Aspal dipanaskan lebih dahulu agar aspal sudah siap saat dimulai

4. Dump Truck dimuati dan ditutupi 4. Produksi dimuat kedalam dumptruck 5 ton dan dikirim ke penghampar aspal

terpal untuk mempertahankan suhu 5. Biaya produksi termasuk pengangkutan sejauh 10 km dari AMP

5. Dump Truck membongkar langsung 6. Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

kedalam mesin penghampar aspal 7. Spek B.M. No. 13/PT/B/1983 (Mix v)dan revisi Spesifikasi Umum Maret 1989 - Buku 3

P E K E R J A VOL. HARI KODE TOTAL VOL. Upah BIAYA SUB JUMLAH

Hari-Orang Rp./hari/orang (Rp.) (Rp.)

P Mandor 1 1 L061 1 75,000.00 75,000.00

E Operator Terampil 3 1 L081 3 65,000.00 195,000.00

K Pembantu Operator 3 1 L083 3 45,000.00 135,000.00

E Sopir 4 1 L091 4 65,000.00 260,000.00

R Pembantu Sopir 4 1 L099 4 45,000.00 180,000.00

J Buruh Tak Terampil 6 1 L101 6 50,000.00 300,000.00

A Buruh Terampil 3 1 L106 3 50,000.00 150,000.00

1,295,000.00

M A T E R I A L Satuan KODE Total HARGA SAT. BIAYA SUB JUMLAH

Volume (Rp.) (Rp.) (Rp.)

M Pasir ayak untuk beton M041 27.00 130,000.00 3,510,000.00

A Aspal curah kg M061A 7,000.00 11,200.00 78,400,000.00

T Semen 50 kg M080A 100.00 2,187.50 218,750.00

E Alat bantu (set @ 3 alat) set M170 0.06 1,295,000.00 77,700.00

R Batu pecah mesin 0,5/1 cm M026 27.50 253,000.00 6,957,500.00

I

A

L

89,163,950.00

P E R A L A T A N Jumlah Hari KODE Jam HARGA BIAYA SUB JUMLAH

Alat Kerja Kerja (Rp.) (Rp.) (Rp.)

P Wheel Loader 115 HP 1 1 E052 5.00 521,993.00 2,609,965.00

E Mesin Penyampur Aspal 30 t/j 1 1 E155 5.00 7,872,786.00 39,363,930.00

R Dump Truck 5 ton/145 HP 4 1 E212 24.00 384,037.00 9,216,888.00

A

L

A

T

A

N

51,190,783.00

JUMLAH (Rp.) 141,649,733.00

Volume 100 Satuan ton Harga Satuan 1,416,497.33 per ton

Dibulatkan 1,416,497.00 per ton

m3

m3

A N A L I S A H A R G A S A T U A N KODE

LAPIS PONDASI BAWAH KLAS A AGREGAT PECAH TERSARING

( MENGGUNAKAN ALAT ) K.510

PROPINSI : KODE KOTA : KODE DISIAPKAN OLEH : TANGGAL :

JAWA TIMUR ( ) KEDIRI ( )

PROSES : ANGGAPAN :

1. Agregat pecah tersaring ditimbun

disepanjang jalan oleh pemasok 2. Material ditimbun sepanjang jalan oleh pemasok

2. Grader membentuk ulang 3. Dikirim batu quarry/kerikil sungai pecah tersaring yang termurah

permukaan lama jalan 4. Dihampar dan dipadatkan sampai tebal padat 15 cm

3. Grader menghampar agregat

jalan disiram air dengan truk air 6. Koefisien pemadatan = 1,2

4. Pemadatan dengan mesin gilas 7. Gradasi bahan lapis pondasi bawah klas A semua harus melalui saringan 75 mm

6-8 ton sampai 100% MDD sesuai rev. Spek. Umum B.M. Maret 1989 - Buku 3

P E K E R J A VOL. HARI KODE TOTAL VOL. Upah BIAYA SUB JUMLAH

Hari-Orang Rp./hari/orang (Rp.) (Rp.)

P Mandor 1 1 L061 1 75,000.00 75,000.00

E Operator Terampil 2 1 L081 2 65,000.00 130,000.00

K Pembantu Operator 2 1 L083 2 45,000.00 90,000.00

E Sopir 1 1 L091 1 65,000.00 65,000.00

R Pembantu sopir 1 1 L099 1 45,000.00 45,000.00

J Buruh Tak Terampil 6 1 L101 6 50,000.00 300,000.00

A

705,000.00

M A T E R I A L Satuan KODE Total HARGA SAT. BIAYA SUB JUMLAH

Volume (Rp.) (Rp.) (Rp.)

M Batu quarry M010 129.00 148,500.00 19,156,500.00

A Pasir urug M040 51.00 65,000.00 3,315,000.00

T Alat bantu (set @ 3 alat) set M170 0.06 705,000.00 42,300.00

E

R

I

A

L

22,513,800.00

P E R A L A T A N Jumlah Hari KODE Jam HARGA BIAYA SUB JUMLAH

Alat Kerja Kerja (Rp.) (Rp.) (Rp.)

P Motor grader 100 HP 1 1 E010 5.00 155,000.00 775,000.00

E Roller steel wheel 6-8 ton 1 1 E080 5.00 158,703.00 793,515.00

R Truk tangki air 115 HP 1 1 E182 5.00 217,205.00 1,086,025.00

A

L

A

T

A

N

2,654,540.00

JUMLAH (Rp.) 25,873,340.00

Volume 150 Satuan Harga Satuan 172,488.93

Dibulatkan 172,488.00

1. Menggunakan peralatan berat (150 m2/hari)

5. Dihampar dan dipadatkan 1.000 m2/hari

m3

m3

m3 per m3

per m3

A N A L I S A H A R G A S A T U A N KODE

LAPIS PONDASI ATAS KLAS A AGREGAT PECAH TERSARING

( MENGGUNAKAN ALAT ) K.520

PROPINSI : KODE KOTA : KODE DISIAPKAN OLEH : TANGGAL :

JAWA TIMUR ( ) KEDIRI ( )

PROSES : ANGGAPAN :

1. Agregat pecah tersaring ditimbun

disepanjang jalan oleh pemasok 2. Material ditimbun sepanjang jalan oleh pemasok

2. Grader menghampar agregat 3. Dikirim batu quarry/kerikil sungai pecah tersaring yang termurah

3. Jalan disiram air dengan truk air 4. Dihampar dan dipadatkan sampai tebal padat 10 cm

4. Pemadatan dengan mesin gilas

6-8 ton 6. Gradasi agregat lapis pondasi atas klas A semua harus melalui saringan 37,5 mm

sesuai rev. Spek. Umum B.M. Maret 1989 - Buku 3

P E K E R J A VOL. HARI KODE TOTAL VOL. Upah BIAYA SUB JUMLAH

Hari-Orang Rp./hari/orang (Rp.) (Rp.)

P Mandor 1 1 L061 1 75,000.00 75,000.00

E Operator Terampil 2 1 L081 2 65,000.00 130,000.00

K Pembantu Operator 2 1 L083 2 45,000.00 90,000.00

E Sopir 1 1 L091 1 65,000.00 65,000.00

R Pembantu sopir 1 1 L099 1 45,000.00 45,000.00

J Buruh Tak Terampil 6 1 L101 6 50,000.00 300,000.00

A

705,000.00

M A T E R I A L Satuan KODE Total HARGA SAT. BIAYA SUB JUMLAH

Volume (Rp.) (Rp.) (Rp.)

M Batu quarry M010 177.00 148,500.00 26,284,500.00

A Pasir urug M040 19.00 65,000.00 1,235,000.00

T Alat bantu (set @ 3 alat) set M170 0.06 705,000.00 42,300.00

E

R

I

A

L

27,561,800.00

P E R A L A T A N Jumlah Hari KODE Jam HARGA BIAYA SUB JUMLAH

Alat Kerja Kerja (Rp.) (Rp.) (Rp.)

P Motor grader 100 HP 1 1 E010 5.00 155,000.00 775,000.00

E Roller steel wheel 6-8 ton 1 1 E080 5.00 158,703.00 793,515.00

R Truk tangki air 115 HP 1 1 E182 5.00 217,205.00 1,086,025.00

A

L

A

T

A

N

2,654,540.00

JUMLAH (Rp.) 30,921,340.00

Volume 150 Satuan Harga Satuan 206,142.27

Dibulatkan 206,142.00

1. Menggunakan peralatan berat (150 m2/hari)

5. Dihampar dan dipadatkan 1.000 m2/hari

m3

m3

m3 per m3

per m3

A N A L I S A H A R G A S A T U A N KODE

LAPIS PENETRASI 50 MM

LAPEN (MENGGUNAKAN BURUH) K.618

PROPINSI : KODE KOTA : KODE DISIAPKAN OLEH : TANGGAL :

JAWA TIMUR ( ) KEDIRI ( )

P E K E R J A VOL. HARI KODE TOTAL VOL. Upah BIAYA SUB JUMLAH

Hari-Orang Rp./hari/orang (Rp.) (Rp.)

P Mandor 2 3 L061 6 75,000.00 450,000.00

E Operator Terampil 2 3 L081 6 65,000.00 390,000.00

K Sopir 1 3 L.091 3 65,000.00 195,000.00

E Buruh terampil 2 3 L.106 6 50,000.00 300,000.00

R Buruh tak terampil 66 3 L.101 198 50,000.00 9,900,000.00

J

A

11,235,000.00

M A T E R I A L Satuan KODE Total HARGA SAT. BIAYA SUB JUMLAH

Volume (Rp.) (Rp.) (Rp.)

M Batu pecah 3/5 cm M.023 56.00 209,200.00 11,715,200.00

A Batu pecah 2/3 cm M.024 31.00 250,000.00 7,750,000.00

T Batu pecah 1/2 cm M.025 15.50 244,800.00 3,794,400.00

E Pasir ayak beton M.041 3.50 130,000.00 455,000.00

R Aspal kemas kg M.061 6,270.00 12,300.00 77,121,000.00

I Minyak bakar ltr M.065 450.00 12,700.00 5,715,000.00

A Alat bantu set M.170 0.06 11,235,000.00 674,100.00

L

107,224,700.00

P E R A L A T A N Jumlah Hari KODE Jam HARGA BIAYA SUB JUMLAH

Alat Kerja Kerja (Rp.) (Rp.) (Rp.)

P Mesin gilas 3 roda 1 3 E.080 15.00 158,703.00 2,380,545.00

E Mesin penyemprot aspal 1 3 E.153 15.00 68,736.00 1,031,040.00

R Truck bak terbuka 1 3 E.212 15.00 384,037.00 5,760,555.00

A

L

A

T

A

N

9,172,140.00

JUMLAH (Rp.) 127,631,840.00

Volume 1,400 Satuan Harga Satuan 91,165.60

Dibulatkan 91,165.00

m3

m3

m3

m3

m2 per m2

per m2

A N A L I S A H A R G A S A T U A N KODE

PENGHAMPARAN LAPIS TIPIS ASPAL PASIR 20 mm

( MENGGUNAKAN ALAT ) K.621

PROPINSI KODE KOTA KODE DISIAPKAN OLEH : TANGGAL :

JAWA TIMUR ( ) KEDIRI ( )

PROSES : ANGGAPAN :

1. sebelum dilapis tack/pengikat

prermukaan aspal lama dibersihkan 2. Pasir aspal dikirim kelokasi pekerjaan oleh pemasok dari AMP

lebih daulu dengan compressor 3. BJ padat 1,9 ton/m

2. pengisian material sampai bin 4. Tebal padat rata-rata 2 cm

dari spreader oleh pemasok

3. Material dihampar dengan 6. Sesuai spesifikasi B.M.No.02/PT/B/1983

spreader dan dipadatkan dengan

mesin gilas roda baja dan mesin

gilas pneumatic roda karet

P E K E R J A VOL. HARI KODE TOTAL VOL. Upah BIAYA SUB JUMLAH

Hari-Orang Rp./hari/orang 3 (Rp.)

P Mandor 1 1 L061 1 75,000.00 75,000.00

E Operator Terampil 4 1 L081 4 65,000.00 260,000.00

K Pembantu Operator 4 1 L083 4 45,000.00 180,000.00

E Buruh Tak Terampil 6 1 L101 6 50,000.00 300,000.00

R Buruh Terampil 2 1 L106 2 50,000.00 100,000.00

J

A

915,000.00

M A T E R I A L Satuan KODE Total HARGA SAT. BIAYA SUB JUMLAH

Volume (Rp.) (Rp.) (Rp.)

M Campuran panas LATASIR ton K.020 66.00 1,736,473.00 114,607,218.00

A Aspal kg M061 700.00 11,200.00 7,840,000.00

T Minyak bakar ltr M065 175.00 12,700.00 2,222,500.00

E Alat bantu (set @ 3 alat) set M170 0.06 915,000.00 54,900.00

R

I

A

L

124,724,618.00

P E R A L A T A N Jumlah Hari KODE Jam HARGA BIAYA SUB JUMLAH

Alat Kerja Kerja (Rp.) (Rp.) (Rp.)

P Tandem Roller 6-8 ton 1 1 E081 5.00 228,039.00 1,140,195.00

E Pneumatic tire roller 8-15 ton 1 1 E084 5.00 301,432.00 1,507,160.00

R Asphalt sprayer 1.000 lt 1 1 E153 5.00 68,736.00 343,680.00

A Asphalt finisher 1 1 E157 5.00 247,855.00 1,239,275.00

L 1 1 E301 4.00 153,453.00 613,812.00

A

T

A

N

4,844,122.00

JUMLAH (Rp.) 130,483,740.00

Volume 1750 Satuan Harga Satuan 74,562.14

1. Menggunakan alat berat 1.750 m2/hari

5. Lapis tack/pengikat aspal cutback dihampar @0,5 l/m2

Compressor air 210 m3/jam

m2 per m2

Dibulatkan 74,562.00

A N A L I S A H A R G A S A T U A N KODE

PENGHAMPARAN LAPIS TIPIS ASPAL BETON (LATASTON)

( MENGGUNAKAN ALAT ) K.636

PROPINSI KODE KOTA KODE DISIAPKAN OLEH : TANGGAL :

JAWA TIMUR ( ) KEDIRI ( )

PROSES : ANGGAPAN :

1. pengisian material sampai bin

dari spreader oleh pemasok 2. HRS (LATASTON) dikirim sampai ke lokasi oleh pemasok dari AMP

2. Material dihampar dengan 3. Tebal padat rata-rata 3 cm

spreader dan dipadatkan dengan

mesin gilas roda baja dan mesin 5. Spek B.M.No.12/PT/8/1983 (tabel3,3) & rev. Spek Umum Maret 1989 - Buku 3

gilas pneumatic roda karet

3. Hamparan lapis tck/pengikat aspal

P E K E R J A VOL. HARI KODE TOTAL VOL. Upah BIAYA SUB JUMLAH

Hari-Orang Rp./hari/orang (Rp.) (Rp.)

P Mandor 1 1 L061 1 75,000.00 75,000.00

E Operator Terampil 4 1 L081 4 65,000.00 260,000.00

K Pembantu Operator 4 1 L083 4 45,000.00 180,000.00

E Buruh Tak Terampil 12 1 L101 12 50,000.00 600,000.00

R Buruh Terampil 8 1 L106 8 50,000.00 400,000.00

J

A

1,515,000.00

M A T E R I A L Satuan KODE Total HARGA SAT. BIAYA SUB JUMLAH

Volume (Rp.) (Rp.) (Rp.)

M HRS (LATASTON) ton K.035 100.00 1,446,828.00 144,682,800.00

A Aspal kg M061 600.00 11,200.00 6,720,000.00

T Minyak bakar ltr M065 150.00 12,700.00 1,905,000.00

E Alat bantu (set @ 3 alat) set M170 0.06 1,515,000.00 90,900.00

R

I

A

L

153,398,700.00

P E R A L A T A N Jumlah Hari KODE Jam HARGA BIAYA SUB JUMLAH

Alat Kerja Kerja (Rp.) (Rp.) (Rp.)

P Tandem Roller 6-8 ton 1 1 E081 5.00 228,039.00 1,140,195.00

E Pneumatic tire roller 8-15 ton 1 1 E084 5.00 301,432.00 1,507,160.00

R Asphalt sprayer 1.000 lt 1 1 E153 5.00 68,736.00 343,680.00

A Asphalt finisher 1 1 E157 5.00 247,855.00 1,239,275.00

L 1 1 E301 4.00 153,453.00 613,812.00

A

T

A

N

4,844,122.00

JUMLAH (Rp.) 159,757,822.00

per m2

1. Menggunakan peralatan berat 1.500 m2/hari

4. BJ Lataston 2,2 ton/m3

cutback @ 0,5 l/m2

Compressor air 210 m3/jam

Volume 1500 Satuan Harga Satuan 106,505.21

Dibulatkan 106,505.00

A N A L I S A H A R G A S A T U A N KODE

PENGHAMPARAN LAPIS PERMUKAAN ASPAL BETON (LASTON)

( MENGGUNAKAN ALAT ) K.641

PROPINSI KODE KOTA KODE DISIAPKAN OLEH : TANGGAL :

JAWA TIMUR ( ) KEDIRI ( )

PROSES : ANGGAPAN :

1. pengisian material sampai bin 1. Menggunakan peralatan berat

dari spreader oleh pemasok 2. Hotmix aspal beton dikirim sampai ke spreader oleh pemasok dari AMP

2. Material dihampar dengan

spreader dan dipadatkan dengan

mesin gilas roda baja dan mesin

gilas pneumatic roda karet 6. Spek B.M.No.13/PT/B/1983 (Mix v) & rev. Spek Umum maret 1989 - Buku 3

P E K E R J A VOL. HARI KODE TOTAL VOL. Upah BIAYA SUB JUMLAH

Hari-Orang Rp./hari/orang (Rp.) (Rp.)

P Mandor 1 1 L061 1 75,000.00 75,000.00

E Operator Terampil 5 1 L081 5 65,000.00 325,000.00

K Pembantu Operator 5 1 L083 5 45,000.00 225,000.00

E Buruh Tak Terampil 15 1 L101 15 50,000.00 750,000.00

R Buruh Terampil 10 1 L106 10 50,000.00 500,000.00

J

A

1,875,000.00

M A T E R I A L Satuan KODE Total HARGA SAT. BIAYA SUB JUMLAH

Volume (Rp.) (Rp.) (Rp.)

M Aspal beton (LASTON) ton K.040 100.00 1,416,497.00 141,649,700.00

A Pasir ayak untuk beton M041 0.90 130,000.00 117,000.00

T Aspal kg M061 360.00 11,200.00 4,032,000.00

E Minyak bakar ltr M065 90.00 12,700.00 1,143,000.00

R Alat bantu (set @ 3 alat) set M170 0.06 1,875,000.00 112,500.00

I

A

L

147,054,200.00

P E R A L A T A N Jumlah Hari KODE Jam HARGA BIAYA SUB JUMLAH

Alat Kerja Kerja (Rp.) (Rp.) (Rp.)

P Roller steel wheel 6-8 ton 1 1 E080 5.00 158,703.00 793,515.00

E Tandem Roller 6-8 ton 1 1 E081 5.00 228,039.00 1,140,195.00

R Pneumatic tire roller 8-15 ton 1 1 E084 5.00 301,432.00 1,507,160.00

A Asphalt sprayer 1.000 lt 1 1 E153 5.00 68,736.00 343,680.00

L Asphalt finisher 1 1 E157 5.00 247,855.00 1,239,275.00

A 1 1 E301 4.00 153,453.00 613,812.00

T

A

N

5,637,637.00

m2 per m2

per m2

3. Berat Jenis padat 2,25 t/m3 tebal 5 cm

4. Dihamparkan dan dipadatkan 900 m2/hari

5. Lapis tack/pengikat aspal cutback dihampar @ 0,5 l/m2

m3

Compressor air 210 m3/jam

JUMLAH (Rp.) 154,566,837.00

Volume 900 Satuan Harga Satuan 171,740.93

Dibulatkan 171,740.00

m2 per m2