Transcript
Page 1: 06 Analisa Instalasi Listrik Semester I 2015

1 63,316.002 65,076.003 42,732.3645 189,970.006 34,650.007 26,833.138 869,522.549 1,091,468.3310 240,603.0011 11,706.2612 299,366.2613 963,354.97

1 204,930.002 3,167,190.193 3,146,419.994 3,639,214.125 3,536,860.596 3,434,507.067 3,429,314.518 3,407,712.349 2,944,440.1910 2,997,595.4911 5,491,120.3712 5,491,120.3713 3,248,956.8614 2,702,462.9215 1,884,784.8916 1,654,701.5617 2,300,277.2618 2,197,923.7219 2,141,554.4120 2,171,129.0121 1,452,118.2222 1,668,440.1923 4,415,041.19

1 50,930.002 64,900.003 1,264,113.924 599,559.035 507,590.606 415,622.177 364,445.408 312,955.50

1 139,810.002 24,024.003 4,319,810.004 3,369,410.005 3,217,610.006 2,423,410.007 265,419.008 190,549.709 132,016.5010 6,211,810.00

LAMPIRAN XIPERATURAN WALIKOTA SEMARANG NOMOR : 44TENTANGSTANDARISASI HARGA SATUAN BANGUNAN , UPAHDANANALISA PEKERJAAN UNTUK KEGIATAN PEMBANGUNAN PEMERINTAH KOTA SEMARANG TAHUN ANGGARAN 2015

DAFTAR HARGA SATUAN PEKERJAAN INSTALASI LISTRIKPEMERINTAH KOTA SEMARANG SEMESTER I TAHUN 2015

(Belum termasuk PPN)NO ANALISA URAIAN PEKERJAAN SATUAN

HARGA SATUAN (Rp.)

I PEKERJAAN PONDASI1 m³ - galian tanah keras sedalam 1 meter m31 m³ - galian tanah keras sedalam 3 meter m31 m2 - Plesteran 1 pc : 8 pp, tebal 15 mm m21 m³ - urug kembali galian m3 1/3 harga galian1 m³ - urugan pasir m31 m³ - memadatkan tanah (per 20cm) m31 m2 - acian m21m3 - membuat lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,8 m31m3 - membuat beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m31 m2 - bekisting untuk kolom m21 kg - pembesian kg1 buah - pondasi tiang, uk. 40 x 40 x 80 cm buah1 buah - pondasi tiang, uk. 40 x 40 x 200 cm buah

II PEKERJAAN TIANG1 buah - upah pasang tiang buah1 buah - tiang 1 (satu) tangan RS.9 (langsung/terusan) buah1 buah - tiang 1 (satu) tangan RS.9 (langsung/terusan) buah1 buah - tiang 1 (satu) tangan RS.9 (dengan stang 4 meter) buah1 buah - tiang 1 (satu) tangan RS.9 (dengan stang 3 meter) buah1 buah - tiang 1 (satu) tangan RS.9 (dengan stang 2 meter) buah1 buah - tiang 1 (satu) tangan RS.9 (dengan stang 1,5 meter) buah1 buah - tiang 1 (satu) tangan RS.9 (untuk lampu caping) buah1 buah - tiang 2 (dua) tangan RS.9 (langsung/terusan) buah1 buah - tiang 3 (tiga) tangan RS.9 (langsung/terusan) buah1 buah - tiang oktagonal 1 (satu) tangan RS.9 buah1 buah - tiang oktagonal 2 (dua) tangan RS.9 buah1 buah - tiang beton 1 (satu) tangan RS.9 (dengan stang 3 meter) buah1 buah - tiang bantu RS.9 buah1 buah - tiang 1 (satu) tangan RS.7 (langsung/terusan) buah1 buah - tiang 1 (satu) tangan RS.6 (langsung/terusan) buah1 buah - tiang 1 (satu) tangan RS.6 (dengan stang 3 meter) buah1 buah - tiang 1 (satu) tangan RS.6 (dengan stang 2 meter) buah1 buah - tiang 1 (satu) tangan RS.6 (dengan stang 1.5 meter) buah1 buah - tiang 1 (satu) tangan RS.6 (untuk lampu caping) buah1 buah - tiang 1 (satu) tangan RS.4 (langsung/terusan) buah1 buah - tiang 2 (dua) tangan RS.4 (langsung/terusan) buah1 buah - tiang 4 (empat) tangan RS.11 (langsung/terusan) buah

III PEKERJAAN STANG1 buah - upah pasang stang buah1 buah - upah pembengkokkan (roll) pipa galvanis buah1 buah - stang Ø 2" - 6 meter buah1 buah - stang Ø 2" - 4 meter buah1 buah - stang Ø 2" - 3 meter buah1 buah - stang Ø 2" - 2 meter buah1 buah - stang Ø 2" - 1.5 meter buah1 buah - stang Ø 1" - 2 meter (caping) buah

IV PEKERJAAN LAMPU1 unit - upah pasang lampu (komplit set) unit1 unit - upah pasang lampu SL unit1 buah - lampu HPST 400 watt (komplit set) buah1 buah - lampu HPST 250 watt (komplit set) buah1 buah - lampu HPST 150 watt (komplit set) buah1 buah - lampu HPST 70 watt (komplit set) buah1 buah - lampu SL 65 watt buah1 buah - lampu SL 42 watt buah1 buah - lampu SL 43 watt buah1 buah - lampu LVD 40 watt buah

NO ANALISA URAIAN PEKERJAAN SATUAN

HARGA SATUAN (Rp.)

Page 2: 06 Analisa Instalasi Listrik Semester I 2015

1 69,905.002 100,375.003 34,544.404 950,463.805 372,105.806 1,115,463.807 142,512.858 203,646.67

1 73,150.002 5,774,290.50

1 232,650.002 176,825.003 115,225.004 57,475.005 109,725.006 94,380.00

1 2,200.002 2,200.003 61,875.004 82,500.005 123,750.006 165,000.007 247,500.008 122,375.009 163,166.6710 244,750.0011 326,333.3312 489,500.0013 825.0014 11,000.00

V PEKERJAAN JARINGAN1 gawang - upah pasang jaringan udara unit1 gawang - upah pasang jaringan bawah tanah unit1 buah - konstruksi SJ.6 unit1 gawang - jaringan udara (LVTC 3 x 16 mm2) unit1 gawang - jaringan udara (LVTC 2 x 10 mm2) unit1 gawang - jaringan udara (LVTC 2 x 25mm2) unit1 meter - jaringan bawah tanah (Kabel NYY 4 x 6 mm2) unit1 meter - jaringan bawah tanah dengan bor horisontal unit

VI PEKERJAAN PANEL1 unit - upah pasang box panel unit1 unit - pemasangan box panel unit

VII PEKERJAAN BONGKARAN1 buah - bongkar tiang dan armature buah1 buah - bongkar tiang buah1 buah - bongkar stang dan armature buah1 buah - bongkar stang buah1 buah - bongkar box APP (komplit set) buah1 gawang - bongkar jaringan udara gawang

VIII PEKERJAAN LAIN-LAIN1 VA - BP.UJL PLN VA1 VA - Tambah daya VA1 buah - stang lampu 1" - 1,5 meter (Pipa medium A) buah1 buah - stang lampu 1" - 2 meter (Pipa medium A) buah1 buah - stang lampu 1" - 3 meter (Pipa medium A) buah1 buah - stang lampu 1" - 4 meter (Pipa medium A) buah1 buah - stang lampu 1" - 6 meter (Pipa medium A) buah1 buah - stang lampu 2" - 1,5 meter (Pipa medium A) buah1 buah - stang lampu 2" - 2 meter (Pipa medium A) buah1 buah - stang lampu 2" - 3 meter (Pipa medium A) buah1 buah - stang lampu 2" - 4 meter (Pipa medium A) buah1 buah - stang lampu 2" - 6 meter (Pipa medium A) buah1 buah - pengadaan stopping buah1 buah - pengadaan konektor buah

WALIKOTA SEMARANGHENDRAR PRIHADI

Page 3: 06 Analisa Instalasi Listrik Semester I 2015

KETERANGAN HAL

Hal. 1Hal. 1Hal. 2Hal. 2Hal. 3Hal. 3Hal. 4Hal. 4Hal. 5Hal. 5

Hal. 6Hal. 6

Hal. 7Hal. 7Hal. 8Hal. 8Hal. 9Hal. 9Hal. 10Hal. 10Hal. 11Hal. 11Hal. 11Hal. 12Hal. 12Hal. 13Hal. 13Hal. 14Hal. 14Hal. 15Hal. 15Hal. 16Hal. 16Hal. 17Hal. 17

Hal. 18Hal. 18Hal. 19Hal. 19Hal. 20Hal. 20Hal. 21Hal. 21

Hal. 22Hal. 22Hal. 23Hal. 23Hal. 23Hal. 24Hal. 24Hal. 24Hal. 25Hal. 25

KETERANGAN HAL

Page 4: 06 Analisa Instalasi Listrik Semester I 2015

Hal. 26Hal. 26Hal. 27Hal. 27Hal. 28Hal. 28Hal. 29Hal. 29

Hal. 30Hal. 30

Hal. 31Hal. 31Hal. 32Hal. 32Hal. 33Hal. 33

Hal. 33Hal. 34Hal. 34Hal. 34Hal. 35Hal. 35Hal. 35Hal. 36Hal. 36Hal. 36Hal. 36Hal. 37Hal. 37Hal. 38


Top Related