36
PENGUJIAN PENETROMETER KONUS DINAMIS (DCP) PROYEK :KLASIFIKASI JALAN DIKERJAKAN LOKASI :JLN. BRIG. SUGIHARTO DIHITUNG STA/KM :1 TANGGAL UKURAN KONUS BANYAK KUMULATIF PENETRASI KUMULATIF DCP TUMBUKAN TUMBUKAN PENETRASI (cm) (cm) (cm/tumbukan) 0 0 0 0 2.22 1 1 2 2 1 2 1.2 3.2 1 3 1.1 4.3 1 4 1.6 5.9 1 5 5.1 11 1 6 2.3 13.3 1 7 5.3 18.6 5.10 1 8 5.9 24.5 1 9 4.3 28.8 1 10 1.9 30.7 1.67 1 11 1.3 32 1 12 1.6 33.6 1 13 2.1 35.7 1 14 5.4 41.1 3.69 1 15 4.8 45.9 1 16 2.1 48 1 17 3.5 51.5 1 18 3.2 54.7 1 19 2.9 57.6 1 20 4.4 62 1 21 5 67 1 22 3.9 70.9 1 23 4.1 75 1 24 3 78 LABORATORIUM MEKANIKA TANAH TEKNIK SIPIL UNNES :30° 0 2 4 6 8 10 12 1 -40 -30 -20 -10 0 KOMULATIF TUMBUKAN PENETRASI (cm)

Upload: evi-kristianingrum

Post on 23-Jan-2016

6 views

Category:

Documents


1 download

DESCRIPTION

DCP

TRANSCRIPT

Page 1: Dcp

PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)

PROYEK :KLASIFIKASI JALAN DIKERJAKAN : KELOMPOK

LOKASI :JLN. BRIG. SUGIHARTO DIHITUNG :

STA/KM :1 TANGGAL :30-05-2015

UKURAN KONUS

BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR

TUMBUKAN TUMBUKAN PENETRASI

(cm) (cm) (cm/tumbukan) (%)

0 0 0 0

2.22 9.19

1 1 2 2

1 2 1.2 3.2

1 3 1.1 4.3

1 4 1.6 5.9

1 5 5.1 11

1 6 2.3 13.3

1 7 5.3 18.6

5.10 3.601 8 5.9 24.5

1 9 4.3 28.8

1 10 1.9 30.7

1.67 12.661 11 1.3 32

1 12 1.6 33.6

1 13 2.1 35.7

1 14 5.4 41.1

3.69 5.18

1 15 4.8 45.9

1 16 2.1 48

1 17 3.5 51.5

1 18 3.2 54.7

1 19 2.9 57.6

1 20 4.4 62

1 21 5 67

1 22 3.9 70.9

1 23 4.1 75

1 24 3 78

LABORATORIUM MEKANIKA TANAH TEKNIK SIPIL UNNES

:30°

0 2 4 6 8 10 12 14 16 18 20 22 24

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 2: Dcp

0 2 4 6 8 10 12 14 16 18 20 22 24

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 3: Dcp

0 0 0

-2 -2 20

-1.2 -3.2 32

-1.1 -4.3 43

-1.6 -5.9 59

-5.1 -11 110

-2.3 -13.3 133

-5.3 -18.6 186

-5.9 -24.5 245

-4.3 -28.8 288

-1.9 -30.7 307

-1.3 -32 320

-1.6 -33.6 336

-2.1 -35.7 357

-5.4 -41.1 411

-4.8 -45.9 459

-2.1 -48 480

-3.5 -51.5 515

-3.2 -54.7 547

-2.9 -57.6 576

-4.4 -62 620

-5 -67 670

-3.9 -70.9 709

-4.1 -75 750

-3 -78 780

0 2 4 6 8 10 12 14 16 18 20 22 24

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 4: Dcp

0 2 4 6 8 10 12 14 16 18 20 22 24

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 5: Dcp

PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)

PROYEK :KLASIFIKASI JALAN DIKERJAKAN : KELOMPOK

LOKASI :JLN. BRIG. SUGIHARTO DIHITUNG :

STA/KM :1 TANGGAL :30-05-2015

UKURAN KONUS

BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR

TUMBUKAN TUMBUKAN PENETRASI

(cm) (cm) (cm/tumbukan) (%)

0 0 0 0

2.86 6.88

1 1 4.5 4.5

1 2 2.5 7

1 3 2.9 9.9

1 4 3.6 13.5

1 5 4.1 17.6

1 6 2.3 19.9

1 7 2.3 22.2

1 8 2.8 25

1 9 3.2 28.2

1 10 2.6 30.8

1 11 2.5 33.3

1 12 2 35.3

1 13 2.8 38.1

1 14 2 40.1

1 15 2.1 42.2

1 16 1.9 44.1

1 17 2.4 46.5

1 18 2.7 49.2

1 19 3.9 53.1

1 20 4.2 57.3

1 21 4.3 61.6

9.20 1.851 22 5.2 66.8

1 23 13.2 80

LABORATORIUM MEKANIKA TANAH TEKNIK SIPIL UNNES

:30°

0 2 4 6 8 10 12 14 16 18 20 22 24

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 6: Dcp

0 2 4 6 8 10 12 14 16 18 20 22 24

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 7: Dcp

0 0 0

-4.5 -4.5 45

-2.5 -7 70

-2.9 -9.9 99

-3.6 -13.5 135

-4.1 -17.6 176

-2.3 -19.9 199

-2.3 -22.2 222

-2.8 -25 250

-3.2 -28.2 282

-2.6 -30.8 308

-2.5 -33.3 333

-2 -35.3 353

-2.8 -38.1 381

-2 -40.1 401

-2.1 -42.2 422

-1.9 -44.1 441

-2.4 -46.5 465

-2.7 -49.2 492

-3.9 -53.1 531

-4.2 -57.3 573

-4.3 -61.6 616

-5.2 -66.8 668

-13.2 -80 800

0 2 4 6 8 10 12 14 16 18 20 22 24

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 8: Dcp

0 2 4 6 8 10 12 14 16 18 20 22 24

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 9: Dcp

PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)

PROYEK :KLASIFIKASI JALAN DIKERJAKAN : KELOMPOK

LOKASI :JLN. BRIG. SUGIHARTO DIHITUNG :

STA/KM :1 TANGGAL :30-05-2015

UKURAN KONUS

BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR

TUMBUKAN TUMBUKAN PENETRASI

(cm) (cm) (cm/tumbukan) (%)

0 0 0 0

1.48 14.44

1 1 2 2

1 2 1.4 3.4

1 3 1 4.4

5 8 5.7 10.1

1 9 1.3 11.4

5 14 8.5 19.9

1 15 2 21.9

1 16 2.4 24.3

1 17 2.1 26.4

1 18 1.4 27.8

1 19 1.3 29.1

1 20 1 30.1

1 21 1.2 31.3

1 22 1.3 32.6

1 23 1.5 34.1

1 24 2.7 36.8

3.96 4.78

1 25 5.9 42.7

1 26 3 45.7

1 27 3.5 49.2

1 28 4.1 53.3

1 29 3.3 56.6

1 30 4.2 60.8

7.75 2.251 31 8 68.8

1 32 7.5 76.3

LABORATORIUM MEKANIKA TANAH TEKNIK SIPIL UNNES

:30°

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 10: Dcp

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 11: Dcp

0 0 0

-2 -2 20

-1.4 -3.4 34

-1 -4.4 44

-5.7 -10.1 101

-1.3 -11.4 114

-8.5 -19.9 199

-2 -21.9 219

-2.4 -24.3 243

-2.1 -26.4 264

-1.4 -27.8 278

-1.3 -29.1 291

-1 -30.1 301

-1.2 -31.3 313

-1.3 -32.6 326

-1.5 -34.1 341

-2.7 -36.8 368

-5.9 -42.7 427

-3 -45.7 457

-3.5 -49.2 492

-4.1 -53.3 533

-3.3 -56.6 566

-4.2 -60.8 608

-8 -68.8 688

-7.5 -76.3 763

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 12: Dcp

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 13: Dcp

PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)

PROYEK :KLASIFIKASI JALAN DIKERJAKAN : KELOMPOK

LOKASI :JLN. BRIG. SUGIHARTO DIHITUNG :

STA/KM :1 TANGGAL :30-05-2015

UKURAN KONUS

BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR

TUMBUKAN TUMBUKAN PENETRASI

(cm) (cm) (cm/tumbukan) (%)

0 0 0 0

0.85 27.00

1 1 1.7 1.7

1 2 1.1 2.8

1 3 1 3.8

1 4 1 4.8

5 9 4 8.8

5 14 3.1 11.9

5 19 3.5 15.4

5 24 5 20.4

1 25 1.6 22

1.50 14.255 30 6.6 28.6

1 31 1.6 30.2

5 36 8.3 38.5

5 41 7.5 46

1 42 2.6 48.6

2.51 7.98

1 43 2.8 51.4

1 44 2.7 54.1

1 45 2.6 56.7

1 46 2.7 59.4

1 47 3 62.4

1 48 3.2 65.6

1 49 2.7 68.3

1 50 1.9 70.2

1 51 1 71.2

LABORATORIUM MEKANIKA TANAH TEKNIK SIPIL UNNES

:30°

0 4 8 12 16 20 24 28 32 36 40 44 48 52

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 14: Dcp

0 4 8 12 16 20 24 28 32 36 40 44 48 52

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 15: Dcp

0 0 0

-1.7 -1.7 17

-1.1 -2.8 28

-1 -3.8 38

-1 -4.8 48

-4 -8.8 88

-3.1 -11.9 119

-3.5 -15.4 154

-5 -20.4 204

-1.6 -22 220

-6.6 -28.6 286

-1.6 -30.2 302

-8.3 -38.5 385

-7.5 -46 460

-2.6 -48.6 486

-2.8 -51.4 514

-2.7 -54.1 541

-2.6 -56.7 567

-2.7 -59.4 594

-3 -62.4 624

-3.2 -65.6 656

-2.7 -68.3 683

-1.9 -70.2 702

-1 -71.2 712

0 4 8 12 16 20 24 28 32 36 40 44 48 52

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 16: Dcp

0 4 8 12 16 20 24 28 32 36 40 44 48 52

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 17: Dcp

PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)

PROYEK :KLASIFIKASI JALAN DIKERJAKAN : KELOMPOK

LOKASI :JLN. BRIG. SUGIHARTO DIHITUNG :

STA/KM :1 TANGGAL :30-05-2015

UKURAN KONUS

BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR

TUMBUKAN TUMBUKAN PENETRASI

(cm) (cm) (cm/tumbukan) (%)

0 0 0 0

2.66 7.50

1 1 3.1 3.1

1 2 1.9 5

1 3 2.1 7.1

1 4 1.7 8.8

1 5 1 9.8

1 6 6.5 16.3

1 7 2.6 18.9

1 8 2.1 21

1 9 2.9 23.9

1 10 2 25.9

1.30 16.741 11 1.6 27.5

1 12 1.2 28.7

1 13 1.1 29.8

1 14 1.7 31.5

2.10 9.74

1 15 1.8 33.3

1 16 2 35.3

1 17 3.5 38.8

1 18 1.2 40

1 19 2.1 42.1

1 20 2.2 44.3

1 21 1.6 45.9

1 22 1.8 47.7

1 23 2.2 49.9

1 24 1.8 51.7

1 25 1.8 53.5

1 26 2.3 55.8

1 27 2.8 58.6

1 28 2.3 60.9

1 29 2.9 63.8

1 30 1.1 64.9

1 31 1.1 66

1 32 1.8 67.8

1 33 1.4 69.2

1 34 5.2 74.4

1 35 1.3 75.7

LABORATORIUM MEKANIKA TANAH TEKNIK SIPIL UNNES

:30°

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 18: Dcp

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 19: Dcp

0 0 0

-3.1 -3.1 31

-1.9 -5 50

-2.1 -7.1 71

-1.7 -8.8 88

-1 -9.8 98

-6.5 -16.3 163

-2.6 -18.9 189

-2.1 -21 210

-2.9 -23.9 239

-2 -25.9 259

-1.6 -27.5 275

-1.2 -28.7 287

-1.1 -29.8 298

-1.7 -31.5 315

-1.8 -33.3 333

-2 -35.3 353

-3.5 -38.8 388

-1.2 -40 400

-2.1 -42.1 421

-2.2 -44.3 443

-1.6 -45.9 459

-1.8 -47.7 477

-2.2 -49.9 499

-1.8 -51.7 517

-1.8 -53.5 535

-2.3 -55.8 558

-2.8 -58.6 586

-2.3 -60.9 609

-2.9 -63.8 638

-1.1 -64.9 649

-1.1 -66 660

-1.8 -67.8 678

-1.4 -69.2 692

-5.2 -74.4 744

-1.3 -75.7 757

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 20: Dcp

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 21: Dcp

PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)

PROYEK :KLASIFIKASI JALAN DIKERJAKAN : KELOMPOK

LOKASI :JLN. BRIG. SUGIHARTO DIHITUNG :

STA/KM :1 TANGGAL :30-05-2015

UKURAN KONUS

BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR

TUMBUKAN TUMBUKAN PENETRASI

(cm) (cm) (cm/tumbukan) (%)

0 0 0 0

3.66 5.22

1 1 2.8 2.8

1 2 2.5 5.3

1 3 3.7 9

1 4 5.4 14.4

1 5 3.9 18.3

1 6 2.1 20.4

1.72 12.25

1 7 1.6 22

1 8 1.8 23.8

1 9 1.2 25

1 10 1.6 26.6

1 11 1.6 28.2

1 12 1.6 29.8

1 13 1.7 31.5

1 14 1.7 33.2

1 15 1.8 35

1 16 2.3 37.3

1 17 1.8 39.1

1 18 1.9 41

1 19 2 43

2.53 7.90

1 20 2.3 45.3

1 21 2.3 47.6

1 22 2.4 50

1 23 2.3 52.3

1 24 2.6 54.9

1 25 2.4 57.3

1 26 2.2 59.5

1 27 3 62.5

1 28 3.3 65.8

1 29 3.4 69.2

1.28 17.04

1 30 1.6 70.8

1 31 1.2 72

1 32 1 73

1 33 1.3 74.3

1 34 1.3 75.6

LABORATORIUM MEKANIKA TANAH TEKNIK SIPIL UNNES

:30°

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 22: Dcp

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKANKOMULATIF PENETRASI (cm)

Page 23: Dcp

0 0 0

-2.8 -2.8 28

-2.5 -5.3 53

-3.7 -9 90

-5.4 -14.4 144

-3.9 -18.3 183

-2.1 -20.4 204

-1.6 -22 220

-1.8 -23.8 238

-1.2 -25 250

-1.6 -26.6 266

-1.6 -28.2 282

-1.6 -29.8 298

-1.7 -31.5 315

-1.7 -33.2 332

-1.8 -35 350

-2.3 -37.3 373

-1.8 -39.1 391

-1.9 -41 410

-2 -43 430

-2.3 -45.3 453

-2.3 -47.6 476

-2.4 -50 500

-2.3 -52.3 523

-2.6 -54.9 549

-2.4 -57.3 573

-2.2 -59.5 595

-3 -62.5 625

-3.3 -65.8 658

-3.4 -69.2 692

-1.6 -70.8 708

-1.2 -72 720

-1 -73 730

-1.3 -74.3 743

-1.3 -75.6 756

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 24: Dcp

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 25: Dcp

PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)

PROYEK :KLASIFIKASI JALAN DIKERJAKAN : KELOMPOK

LOKASI :JLN. BRIG. SUGIHARTO DIHITUNG :

STA/KM :1 TANGGAL :30-05-2015

UKURAN KONUS

BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR

TUMBUKAN TUMBUKAN PENETRASI

(cm) (cm) (cm/tumbukan) (%)

0 0 0 0

1.52 14.09

1 1 2.4 2.4

1 2 1.6 4

1 3 1.5 5.5

1 4 1.6 7.1

1 5 1.1 8.2

1 6 1.3 9.5

1 7 1.3 10.8

1 8 1.2 12

1 9 1.4 13.4

1 10 1.6 15

1 11 1.8 16.8

1 12 1.5 18.3

1 13 1.6 19.9

1 14 1.6 21.5

1 15 1.6 23.1

1 16 1.9 25

1 17 2.6 27.6

1 18 1.8 29.4

1 19 1.2 30.6

5 24 6.5 37.1

1 25 1.2 38.3

1 26 2.3 40.6

1 27 1.3 41.9

5 32 6.6 48.5

1 33 1.9 50.4

3.00 6.531 34 2.6 53

1 35 3.3 56.3

1 36 3.1 59.4

1 37 2.6 62

0.54 44.985 42 2.4 64.4

5 47 3 67.4

5 52 5.3 72.7

1.50 14.251 53 1.4 74.1

1 54 1.6 75.7

LABORATORIUM MEKANIKA TANAH TEKNIK SIPIL UNNES

:30°

0 4 8 12 16 20 24 28 32 36 40 44 48 52 56

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 26: Dcp

0 4 8 12 16 20 24 28 32 36 40 44 48 52 56

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKANKOMULATIF PENETRASI (cm)

Page 27: Dcp

0 0 0

-2.4 -2.4 24

-1.6 -4 40

-1.5 -5.5 55

-1.6 -7.1 71

-1.1 -8.2 82

-1.3 -9.5 95

-1.3 -10.8 108

-1.2 -12 120

-1.4 -13.4 134

-1.6 -15 150

-1.8 -16.8 168

-1.5 -18.3 183

-1.6 -19.9 199

-1.6 -21.5 215

-1.6 -23.1 231

-1.9 -25 250

-2.6 -27.6 276

-1.8 -29.4 294

-1.2 -30.6 306

-6.5 -37.1 371

-1.2 -38.3 383

-2.3 -40.6 406

-1.3 -41.9 419

-6.6 -48.5 485

-1.9 -50.4 504

-2.6 -53 530

-3.3 -56.3 563

-3.1 -59.4 594

-2.6 -62 620

-2.4 -64.4 644

-3 -67.4 674

-5.3 -72.7 727

-1.4 -74.1 741

-1.6 -75.7 757

0 4 8 12 16 20 24 28 32 36 40 44 48 52 56

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 28: Dcp

0 4 8 12 16 20 24 28 32 36 40 44 48 52 56

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 29: Dcp

PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)

PROYEK :KLASIFIKASI JALAN DIKERJAKAN : KELOMPOK

LOKASI :JLN. BRIG. SUGIHARTO DIHITUNG :

STA/KM :1 TANGGAL :30-05-2015

UKURAN KONUS

BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR

TUMBUKAN TUMBUKAN PENETRASI

(cm) (cm) (cm/tumbukan) (%)

0 0 0 0

2.30 8.811 1 2.7 2.7

1 2 1.8 4.5

1 3 2.4 6.9

5 8 4.9 11.8

1.33 16.271 9 1.2 13

1 10 1.4 14.4

1 11 1.4 15.8

1 12 1.5 17.3

1.79 11.66

1 13 1.7 19

1 14 1.2 20.2

1 15 2.2 22.4

1 16 1.9 24.3

1 17 1.8 26.1

1 18 1.5 27.6

1 19 1.3 28.9

1 20 1.4 30.3

1 21 1.5 31.8

1 22 2 33.8

1 23 1.8 35.6

1 24 1.8 37.4

1 25 2.1 39.5

1 26 2.1 41.6

1 27 3.3 44.9

1 28 1.1 46

1 29 2.6 48.6

2.27 8.96

1 30 1.8 50.4

1 31 2 52.4

1 32 2.4 54.8

1 33 2.1 56.9

1 34 2.2 59.1

1 35 2.4 61.5

1 36 2.3 63.8

1 37 2.3 66.1

1 38 2.5 68.6

1 39 2.4 71

1 40 2.3 73.3

1 41 2.5 75.8

:30°

Page 30: Dcp

LABORATORIUM MEKANIKA TANAH TEKNIK SIPIL UNNES

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 31: Dcp

0 0 0

-2.7 -2.7 27

-1.8 -4.5 45

-2.4 -6.9 69

-4.9 -11.8 118

-1.2 -13 130

-1.4 -14.4 144

-1.4 -15.8 158

-1.5 -17.3 173

-1.7 -19 190

-1.2 -20.2 202

-2.2 -22.4 224

-1.9 -24.3 243

-1.8 -26.1 261

-1.5 -27.6 276

-1.3 -28.9 289

-1.4 -30.3 303

-1.5 -31.8 318

-2 -33.8 338

-1.8 -35.6 356

-1.8 -37.4 374

-2.1 -39.5 395

-2.1 -41.6 416

-3.3 -44.9 449

-1.1 -46 460

-2.6 -48.6 486

-1.8 -50.4 504

-2 -52.4 524

-2.4 -54.8 548

-2.1 -56.9 569

-2.2 -59.1 591

-2.4 -61.5 615

-2.3 -63.8 638

-2.3 -66.1 661

-2.5 -68.6 686

-2.4 -71 710

-2.3 -73.3 733

-2.5 -75.8 758

Page 32: Dcp

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 33: Dcp

PENGUJIAN PENETROMETER KONUS DINAMIS (DCP)

PROYEK :KLASIFIKASI JALAN DIKERJAKAN : KELOMPOK

LOKASI :JLN. BRIG. SUGIHARTO DIHITUNG :

STA/KM :1 TANGGAL :30-05-2015

UKURAN KONUS

BANYAK KUMULATIF PENETRASI KUMULATIF DCP CBR

TUMBUKAN TUMBUKAN PENETRASI

(cm) (cm) (cm/tumbukan) (%)

0 0 0 0

2.58 7.76

1 1 2.8 2.8

1 2 2.2 5

1 3 2.8 7.8

1 4 3 10.8

1 5 2.4 13.2

1 6 1.8 15

1 7 4.1 19.1

1 8 2.7 21.8

1 9 2.3 24.1

1 10 2.3 26.4

1 11 1.9 28.3

1 12 2.8 31.1

1 13 1.9 33

1 14 2.4 35.4

1 15 2.5 37.9

1 16 2.8 40.7

1 17 3.1 43.8

1 18 3.8 47.6

5.03 3.65

1 19 4.4 52

1 20 5.4 57.4

1 21 5.7 63.1

1 22 4.5 67.6

1 23 4.4 72

1 24 5.8 77.8

LABORATORIUM MEKANIKA TANAH TEKNIK SIPIL UNNES

:30°

0 2 4 6 8 10 12 14 16 18 20 22 24 26

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 34: Dcp

0 2 4 6 8 10 12 14 16 18 20 22 24 26

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 35: Dcp

0 0 0

-2.8 -2.8 28

-2.2 -5 50

-2.8 -7.8 78

-3 -10.8 108

-2.4 -13.2 132

-1.8 -15 150

-4.1 -19.1 191

-2.7 -21.8 218

-2.3 -24.1 241

-2.3 -26.4 264

-1.9 -28.3 283

-2.8 -31.1 311

-1.9 -33 330

-2.4 -35.4 354

-2.5 -37.9 379

-2.8 -40.7 407

-3.1 -43.8 438

-3.8 -47.6 476

-4.4 -52 520

-5.4 -57.4 574

-5.7 -63.1 631

-4.5 -67.6 676

-4.4 -72 720

-5.8 -77.8 778

0 2 4 6 8 10 12 14 16 18 20 22 24 26

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)

Page 36: Dcp

0 2 4 6 8 10 12 14 16 18 20 22 24 26

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

KOMULATIF TUMBUKAN

KOMULATIF PENETRASI (cm)