daftar biaya sewa peralatan per jam kerja

6
File : document.xls DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA BIAYA No. URAIAN KODE HP KAPASITAS HARGA SEWA ALAT ALAT/JAM (di luar PPN) 1. ASPHALT MIXING PLANT E01 125.0 50.0 T/Jam 1,710,625,000 1,217,541.46 2. ASPHALT FINISHER E02 47.0 6.0 Ton 636,093,750 146,607.43 3. ASPHALT SPRAYER E03 25.0 ### Liter 143,750,000 60,409.82 4. BULLDOZER 100-150 HP E04 105.0 - - 783,437,500 222,398.67 5. COMPRESSOR 4000-6500 L\M E05 35.0 ### 5,000.00 143,750,000 57,956.96 6. CONCRETE MIXER 0.3-0.6 M3 E06 10.0 0.3 M3 43,125,000 32,470.08 7. CRANE 10-15 TON E07 200.0 25.0 Ton 765,516,600 257,166.67 8. DUMP TRUCK 3-4 M3 E08 120.0 4.0 Ton 120,176,000 72,040.74 9. FLAT BED TRUCK E09 145.0 8.0 Ton 204,843,750 108,425.20 10. EXCAVATOR 80-140 HP E10 105.0 0.9 M3 682,812,500 199,511.80 11. FLAT BED TRUCK 3-4 M3 E11 145.0 5.0 M3 179,687,500 122,796.29 12. GENERATOR SET E12 170.0 125.0 KVA 341,406,250 154,376.44 13. MOTOR GRADER >100 HP E13 125.0 - - 664,843,750 208,702.98 14. TRACK LOADER 75-100 HP E14 95.0 1.5 M3 220,000,000 105,083.86 15. WHEEL LOADER 1.0-1.6 M3 E15 85.0 1.5 M3 571,406,250 171,762.14 16. THREE WHEEL ROLLER 6-8 T E16 60.0 8.0 Ton 428,770,000 132,283.32 17. TANDEM ROLLER 6-8 T. E17 60.0 8.0 Ton 348,593,750 116,682.82 18. TIRE ROLLER 8-10 T. E18 60.0 95.0 Ton 343,750,000 135,157.44 19. VIBRATORY ROLLER 5-8 T. E19 60.0 90.0 Ton 424,062,500 141,569.60 20. CONCRETE VIBRATOR E20 4.0 - - 8,265,625 18,449.81 21. STONE CRUSHER E21 60.0 60.0 T/Jam 1,423,250,703 353,388.66 22. WATER PUMP E22 8.0 2.0 2.00 14,375,000 23,488.61 23. WATER TANKER 3000-4500 L. E23 115.0 ### Liter 115,000,000 91,905.53 24. PEDESTRIAN ROLLER E24 5.0 1.00 Ton 12,500,000 17,921.42 25. TAMPER E25 5.0 0.60 Ton 16,171,875 18,921.74 26. JACK HAMMER E26 8.0 - - 10,781,250 18,765.68 27. FULVI MIXER E27 75.0 - - 46,000,000 56,329.28 28. CONCRETE PUMP E28 60.0 0.75 M3 112,500,000 65,205.94 29. TRAILER 20 TON E29 175.0 20.00 Ton 166,250,000 127,072.26 30. PILE DRIVER + HAMMER E30 25.0 2.50 Ton 70,000,000 45,272.22 31. CRANE ON TRACK 35 TON E31 125.0 35.0 Ton 350,000,000 138,129.09 32. WELDING SET E32 40.0 250.0 Amp 17,500,000 41,619.39 33. BORE PILE MACHINE E33 150.0 ### Meter 2,250,000,000 489,586.25 34. ASPHALT LIQUID MIXER E34 5.0 ### Liter 15,000,000 26,170.92 35. TRAILLER 15 TON E35 150.0 15.0 Ton 115,000,000 109,304.19 36. ROCK DRILL BREAKER E36 3.0 - 27,721,250 42,075.84 37. COLD MILLING E37 125 - 474,750,000 211,426.55 38. VIBRATORY ROLLER 1 T. E38 7.0 1.00 Ton 48,000,000 30,201.45

Upload: beta-martilova-putra

Post on 19-Jan-2016

330 views

Category:

Documents


9 download

DESCRIPTION

Jenis-jenis hargasewa alat

TRANSCRIPT

Page 1: Daftar Biaya Sewa Peralatan Per Jam Kerja

File : document.xls

DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

No. URAIAN KODE HP KAPASITAS HARGAALAT

1. ASPHALT MIXING PLANT E01 125.0 50.0 T/Jam 1,710,625,000

2. ASPHALT FINISHER E02 47.0 6.0 Ton 636,093,750

3. ASPHALT SPRAYER E03 25.0 1,000.0 Liter 143,750,000

4. BULLDOZER 100-150 HP E04 105.0 - - 783,437,500

5. COMPRESSOR 4000-6500 L\M E05 35.0 5,000.0 5,000.00 143,750,000

6. CONCRETE MIXER 0.3-0.6 M3 E06 10.0 0.3 M3 43,125,000

7. CRANE 10-15 TON E07 200.0 25.0 Ton 765,516,600

8. DUMP TRUCK 3-4 M3 E08 120.0 4.0 Ton 120,176,000

9. FLAT BED TRUCK E09 145.0 8.0 Ton 204,843,750

10. EXCAVATOR 80-140 HP E10 105.0 0.9 M3 682,812,500

11. FLAT BED TRUCK 3-4 M3 E11 145.0 5.0 M3 179,687,500

12. GENERATOR SET E12 170.0 125.0 KVA 341,406,250

13. MOTOR GRADER >100 HP E13 125.0 - - 664,843,750

14. TRACK LOADER 75-100 HP E14 95.0 1.5 M3 220,000,000

15. WHEEL LOADER 1.0-1.6 M3 E15 85.0 1.5 M3 571,406,250

16. THREE WHEEL ROLLER 6-8 T E16 60.0 8.0 Ton 428,770,000

17. TANDEM ROLLER 6-8 T. E17 60.0 8.0 Ton 348,593,750

18. TIRE ROLLER 8-10 T. E18 60.0 95.0 Ton 343,750,000

19. VIBRATORY ROLLER 5-8 T. E19 60.0 90.0 Ton 424,062,500

20. CONCRETE VIBRATOR E20 4.0 - - 8,265,625

21. STONE CRUSHER E21 60.0 60.0 T/Jam 1,423,250,703

22. WATER PUMP E22 8.0 2.0 2.00 14,375,000

23. WATER TANKER 3000-4500 L. E23 115.0 4,000.0 Liter 115,000,000

24. PEDESTRIAN ROLLER E24 5.0 1.00 Ton 12,500,000

25. TAMPER E25 5.0 0.60 Ton 16,171,875

26. JACK HAMMER E26 8.0 - - 10,781,250

27. FULVI MIXER E27 75.0 - - 46,000,000

28. CONCRETE PUMP E28 60.0 0.75 M3 112,500,000

29. TRAILER 20 TON E29 175.0 20.00 Ton 166,250,000

30. PILE DRIVER + HAMMER E30 25.0 2.50 Ton 70,000,000

31. CRANE ON TRACK 35 TON E31 125.0 35.0 Ton 350,000,000

32. WELDING SET E32 40.0 250.0 Amp 17,500,000

33. BORE PILE MACHINE E33 150.0 2,000.0 Meter 2,250,000,000

34. ASPHALT LIQUID MIXER E34 5.0 1,000.0 Liter 15,000,000

35. TRAILLER 15 TON E35 150.0 15.0 Ton 115,000,000

36. ROCK DRILL BREAKER E36 3.0 - 27,721,250

37. COLD MILLING E37 125 - 474,750,000

38. VIBRATORY ROLLER 1 T. E38 7.0 1.00 Ton 48,000,000

Page 2: Daftar Biaya Sewa Peralatan Per Jam Kerja

File : document.xls

DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

BIAYA

SEWA KET.

ALAT/JAM

(di luar PPN)

1,217,541.46 Alat Baru

146,607.43 Alat Baru

60,409.82 Alat Baru

222,398.67 Alat Baru

57,956.96 Alat Baru

32,470.08 Alat Baru

257,166.67 Alat Baru

72,040.74 Alat Baru

108,425.20 Alat Baru

199,511.80 Alat Baru

122,796.29 Alat Baru

154,376.44 Alat Baru

208,702.98 Alat Baru

105,083.86 Alat Baru

171,762.14 Alat Baru

132,283.32 Alat Baru

116,682.82 Alat Baru

135,157.44 Alat Baru

141,569.60 Alat Baru

18,449.81 Alat Baru

353,388.66 Alat Baru

23,488.61 Alat Baru

91,905.53 Alat Baru

17,921.42 Alat Baru

18,921.74 Alat Baru

18,765.68 Alat Baru

56,329.28 Alat Baru

65,205.94 Alat Baru

127,072.26 Alat Baru

45,272.22 Alat Baru

138,129.09 Alat Baru

41,619.39 Alat Baru

489,586.25 Alat Baru

26,170.92 Alat Baru

109,304.19 Alat Baru

42,075.84 Alat Baru

211,426.55 Alat Baru

30,201.45 Alat Baru

Page 3: Daftar Biaya Sewa Peralatan Per Jam Kerja

ANALIS EE155 asphalt mixing plants

E157 asphalt finisher

E154 asphalt sprayer

E001 bulldozer

E301 air compressor

E06 concrete mixer

E07 crane

E212 truck

E221 dump truck

E10 excavator

E11 flat bed truck

E12 generator set

E010 motor grader

E14 track loader

E052 whell loader

E080 three whell roller

E081 tandem roller

E084 pneumatic tire roller

E082 vibratory roller

E089 concrete vibrator

E031 stone crusher

E341 water pump

E182 water tanker

E24 pedestrian roller

E25 plate temper

E26 jack hammer

E27 fulvi mixer

E28 concrete pump

E29 trailer

E30 pile diver hammer

E31 crane on truck

E32 velding set

E33 bore pile

E34 asphalt liquid mixer

E35 trailler

E36 cold milling (winget)

E37 rock drill breaker

Page 4: Daftar Biaya Sewa Peralatan Per Jam Kerja

File : document.xls

URAIAN ANALISA ALAT

Tabel-tabel di bawah iniNo. U R A I A N KODE KOEF. SATUAN KET.

Merupakan acuan untukHARGA

A. URAIAN PERALATAN ALAT

1. Jenis Peralatan TRAILLER 15 TON E35 2. Tenaga Pw 150.0 HP UE' 3. Kapasitas Cp 15.0 Ton ### 4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun E35

b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam ### c. Harga Alat B 115,000,000 Rupiah ###

5. Alat Yang Dipakai : a. Umur Ekonomis A' 10.0 Tahun Alat Baru b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam Alat Baru c. Harga Alat (*) B' 115,000,000 Rupiah Alat Baru

###B. BIAYA PASTI PER JAM KERJA ###

1. Nilai Sisa Alat = 10 % x B C 11,500,000 Rupiah ###

### 2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.19171 - ###

(1 + i)^A' - 1 ### 3. Biaya Pasti per Jam : ###

a. Biaya Pengembalian Modal = ( B' - C ) x D E 13,228.23 Rupiah ###W' ###

###b. Asuransi, dll = 0.002 x B' F 153.33 Rupiah ###

W' ###

###Biaya Pasti per Jam = ( E + F ) G 13,381.57 Rupiah ###

###C. BIAYA OPERASI PER JAM KERJA ###

### 1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 39,375.00 Rupiah ###

###

### 2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 26,250.00 Rupiah ###

### 3. Perawatan dan = (12,5 % - 17,5 %) x B K 9,583.33 Rupiah ###

perbaikan W' ### 4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ### 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 19,285.71 Rupiah ###

###Biaya Operasi per Jam = (H+I+K+L+M) P 108,779.76 Rupiah ###

###D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 122,161.33 Rupiah ###

###

###E. LAIN - LAIN ###

1. Tingkat Suku Bunga i 14.00 % / Tahun ###

2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ### 3. Upah Pembantu Operator / Pmb.Sopir U2 6,428.57 Rp./Jam ### 4. Bahan Bakar Bensin Mb 2,400.00 Liter ### 5. Bahan Bakar Solar Ms 2,100.00 Liter ### 6. Minyak Pelumas Mp 17,500.00 Liter ### 7. PPN diperhitungkan pada lembar Rekapitulasi ###

Biaya Pekerjaan ######

Page 5: Daftar Biaya Sewa Peralatan Per Jam Kerja

File : document.xls

###

URAIAN ANALISA ALAT

Tabel-tabel di bawah iniNo. U R A I A N KODE KOEF. SATUAN KET.

Merupakan acuan untukHARGA

A. URAIAN PERALATAN ALAT

1. Jenis Peralatan COLD MILLING (WINGET) E36 2. Tenaga Pw 125.0 HP UE' 3. Kapasitas Cp - - ### 4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun E35

b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam ### c. Harga Alat B 474,750,000 Rupiah ###

5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam Alat Baru c. Harga Alat (*) B' 474,750,000 Rupiah Alat Baru

###B. BIAYA PASTI PER JAM KERJA ###

1. Nilai Sisa Alat = 10 % x B C 47,475,000 Rupiah ###

### 2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.29128 - ###

(1 + i)^A' - 1 ### 3. Biaya Pasti per Jam : ###

a. Biaya Pengembalian Modal = ( B' - C ) x D E 82,972.12 Rupiah ###W' ###

###b. Asuransi, dll = 0.002 x B' F 633.00 Rupiah ###

W' ###

###Biaya Pasti per Jam = ( E + F ) G 83,605.12 Rupiah ###

###C. BIAYA OPERASI PER JAM KERJA ###

### 1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 32,812.50 Rupiah ###

###

### 2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 21,875.00 Rupiah ###

### 3. Perawatan dan = (12,5 % - 17,5 %) x B' K 39,562.50 Rupiah ###

perbaikan W' ### 4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ### 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 19,285.71 Rupiah ###

###Biaya Operasi per Jam = (H+I+K+L+M) P 127,821.43 Rupiah ###

###D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 211,426.55 Rupiah ###

###

###E. LAIN - LAIN ###

1. Tingkat Suku Bunga i 14.00 % / Tahun ###

2. Upah Operator / Sopir U1 14,285.71 Rp./Jam ### 3. Upah Pembantu Operator / Pmb.Sopir U2 6,428.57 Rp./Jam ### 4. Bahan Bakar Bensin Mb 2,400.00 Liter ### 5. Bahan Bakar Solar Ms 2,100.00 Liter ### 6. Minyak Pelumas Mp 17,500.00 Liter ### 7. PPN diperhitungkan pada lembar Rekapitulasi ###

Biaya Pekerjaan ######

###

URAIAN ANALISA ALAT######

No. U R A I A N KODE KOEF. SATUAN KET.> 15th ?

Kondisi Alat

A. URAIAN PERALATAN Nilai B' dari

1. Jenis Peralatan ROCK DRILL BREAKER E37 2. Tenaga Pw 3.0 HP 3. Kapasitas Cp - - ### 4. Alat Baru : a. Umur Ekonomis A 10.0 Tahun E38

b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam ### c. Harga Alat B 27,721,250 Rupiah ###

5. Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru

Page 6: Daftar Biaya Sewa Peralatan Per Jam Kerja

File : document.xls

b. Jam Kerja Dalam 1 Tahun W' 1,500.0 Jam Alat Baru c. Harga Alat (*) B' 27,721,250 Rupiah Alat Baru

###B. BIAYA PASTI PER JAM KERJA ###

1. Nilai Sisa Alat = 10 % x B C 2,772,125 Rupiah ######

2. Faktor Angsuran Modal = i x (1 + i)^A' D 0.29128 - ###(1 + i)^A' - 1 ###

3. Biaya Pasti per Jam : ###a. Biaya Pengembalian Modal = ( B' - C ) x D E 4,844.85 Rupiah ###

W' > 15th ? Kondisi Alat

b. Asuransi, dll = 0.002 x B' F 36.96 Rupiah Nilai B' dari

W' Depresiasi

Biaya Pasti per Jam = ( E + F ) G 4,881.81 Rupiah ### E39

C. BIAYA OPERASI PER JAM KERJA ######

1. Bahan Bakar = (0.125-0.175 Ltr/HP/Jam) x Pw x Ms H 787.50 Rupiah #########

2. Pelumas = (0.01-0.02 Ltr/HP/Jam) x Pw x Mp I 525.00 Rupiah ######

3. Perawatan dan = (12,5 % - 17,5 %) x B K 2,310.10 Rupiah ### perbaikan W' ###

4. Operator = ( 1 Orang / Jam ) x U1 L 14,285.71 Rupiah ### 5. Pembantu Operator = ( 1 Orang / Jam ) x U2 M 19,285.71 Rupiah ###

###Biaya Operasi per Jam = (H+I+K+L+M) P 37,194.03 Rupiah ###

> 15th ?D. TOTAL BIAYA SEWA ALAT / JAM = ( G + P ) T 42,075.84 Rupiah Kondisi Alat

Nilai B' dari

Depresiasi

E. LAIN - LAIN 1. Tingkat Suku Bunga i 14.00 % / Tahun ### 2. Upah Operator / Sopir U1 14,285.71 Rp./Jam E40 3. Upah Pembantu Operator / Pmb.Sopir U2 6,428.57 Rp./Jam ### 4. Bahan Bakar Bensin Mb 2,400.00 Liter ### 5. Bahan Bakar Solar Ms 2,100.00 Liter ### 6. Minyak Pelumas Mp 17,500.00 Liter ### 7. PPN diperhitungkan pada lembar Rekapitulasi ###

Biaya Pekerjaan ######