rekap TotalREKAPITULASI RENCANA ANGGARAN BIAYA

PROGRAM: GEDUNG DAN BANGUNANKEGIATAN: PEMBANGUNAN GEDUNG ASRAMA BERLANTAI 5 LPMP SUMBARPEKERJAAN: PEMBANGUNAN GEDUNG KELAS dan ASRAMA BLOK B TAHAP I (STRUKTUR)LOKASI: KOMPLEK PERGURUAN TINGGI AIR TAWAR PADANGTAHUN: 2015

NO.URAIAN PEKERJAANSUB TOTAL

Anggrek11,093,180,700.98AIPEKERJAAN STRUKTUR BAWAHRp2,813,187,601.97Flamboyan11,171,006,362.16B

IIPEKERJAAN STRUKTUR ATASII.1PEKERJAAN STRUKTUR LANTAI 1 (SATU)Rp1,456,758,540.50II.2PEKERJAAN LANTAI 2 (DUA)Rp1,288,339,371.75II.3PEKERJAAN LANTAI 3 (TIGA)Rp1,289,375,978.15II.4PEKERJAAN LANTAI 4 (EMPAT)Rp1,145,633,245.05II.5PEKERJAAN STRUKTUR LANTAI 5 (LIMA)Rp1,340,987,328.51II.6PEKERJAAN STRUKTUR LANTAI DACKRp442,299,254.12II.7PEKERJAAN STRUKTUR ATAPRp378,876,109.43

JUMLAH SUB TOTALRp10,155,457,429.48PPN 10 %Rp1,015,545,742.95JUMLAH TOTALRp11,171,003,172.43DIBULATKANRp11,171,000,000.006,362.16

Terbilang :Sebelas Milyar Seratus Tujuh Puluh Satu Juta Rupiah

Padang, April 2015Konsultan PerencanaPT. NATURAL SUMATERA CONSULTANT

Ir. CHANDRA SURYADirekturDiketahui/Disetujui Oleh :KEPALA LPMP PROVINSI SUMATERA BARAT

Prof.Dr. JAMARIS JAMNA, M.Pd.,NIP. 19621010 198602 1 0021Diketahui/Disetujui Oleh :PEJABAT PEMBUAT KOMITMENLPMP PROVINSI SUMATERA BARAT

HERRY HERLAMBANGNIP. 19770924 200112 1003Diketahui/Disetujui Oleh :PENGELOLA TEKNIS PROYEKDPU. PROVINSI SUMBAR

Ir. APRIMENSYAH, MM.SP.NIP. 19620420 199203 1 006

RABRENCANA ANGGARAN BIAYA (R.A.B)

PROGRAM: GEDUNG DAN BANGUNANKEGIATAN: PEMBANGUNAN GEDUNG ASRAMA BERLANTAI 5 LPMP SUMBARPEKERJAAN: PEMBANGUNAN GEDUNG KELAS dan ASRAMA BLOK B TAHAP I (STRUKTUR)LOKASI: KOMPLEK PERGURUAN TINGGI AIR TAWAR PADANG

KETERANGANNO.URAIAN PEKERJAANSTNVOLUMEVOLUMEHARGA SATUANJUMLAH HARGAJUMLAH SUB. HARGASUB TOTAL

ABCDEFG = E X FGH = SUB JUMLAH G

BGEDUNG BLOCK F (FLAMBOYAN)

IPEKERJAAN STRUKTUR BAWAHRp2,813,187,601.973,094,506,362.16I.1PEKERJAAN PERSIAPANRp134,616,095.10I.1.1Pembersihan LapanganM2989.50989.50Rp13,205.50Rp13,066,842.25I.1.2Pekerjaan Pemasangan BowplankM1155.00155.00Rp59,346.54Rp9,198,713.70I.1.3Pagar Keliling Sementara (Seng Gelombang Tinggi 2 Meter )Bisa dipakai sampai pekerjaan struktur atasM1179.93179.93Rp325,884.01Rp58,636,309.97I.1.4Konstruksi Plank Nama ProyekUk.1mx2m Konstruksi Pipa Baja + Baja Siku DilasUnit2.002.00Rp1,500,000.00Rp3,000,000.00I.1.5Direksi Keet (Kantor Sementara) Dengan Lantai Plesteran (lengkap dgn toilet + ruang shalat)M236.0036.00Rp1,408,728.59Rp50,714,229.18

I.2PEKERJAAN PONDASI KSLLRp2,178,520,000.00I.2.1Pondasi Konstruksi Sarang Laba-Laba (KSLL)M2856.00856.00Rp2,545,000.00Rp2,178,520,000.00Galian Tanah Pondasi(Asumsi MT. -1,00 dari lantai dasar +0,00)Urugan Tanah KembaliUrugan Tanah Baru Dalam PondasiUrugan Pasir 40 cmPemadatanTes Kepadatan Pasir UrugRib 10/80, 11/110, 12/130, 12/220, 12/260 F'C = 21,7 MPa (K 250), SLUMP (12 2) CM, W/C = 0,56Beton Pertebalan Rib dan Voute F'C = 21,7 MPa (K 250), SLUMP (12 2) CM, W/C = 0,56Beton Plat Tebal 12 cm F'C = 21,7 MPa (K 250), SLUMP (12 2) CM, W/C = 0,56Lantai Kerja RibAdukan 1 Pc : 5 PsLantai Kerja PlatAdukan 1 Pc : 5 Ps

I.3PEKERJAAN LAIN-LAINRp429,300,905.79I.3.1Stek Setinggi (H/2)+Tinggi Rip Konstruksi D10 BJTD Fy 400 Mpa & < 10 BJTP Fy 240 MPaKg29,955.4929,955.49Rp13,176.30Rp429,300,905.79(Stek Kolom, Tangga, Pit Lift, Shear Wall)

I.4PEKERJAAN REMODELING RUANG GENSETI.4.1PEKERJAAN PERSIAPANRp47,816,793.32-Pembersihan lapangan M265.0065.00Rp13,205.50Rp858,357.50-Pekerjaan pemasangan Bouwplank M133.0033.00Rp59,346.54Rp1,958,435.82-Bongkaran bangunan lamaLs1.001.00Rp20,000,000.00Rp20,000,000.00-Pemindahan Genset beserta instalasiLs1.001.00Rp25,000,000.00Rp25,000,000.00

I.4.2PEKERJAAN PONDASIRp22,150,244.20I.4.2.1Pekerjaan Tanah-Galian tanah pondasi ( Asumsi MT.-0,60 dari lantai dasar 0,00)M325.0025.00Rp58,616.25Rp1,465,406.25-Urugan tanah kembaliM311.0011.00Rp19,538.75Rp214,926.25-Urugan Tanah PilihanM328.8028.80Rp188,047.75Rp5,415,775.20-Urugan Pasir T.10 cmM33.603.60Rp142,246.50Rp512,087.40-Pemadatan Per 20cmM328.8028.80Rp48,427.50Rp1,394,712.00

I.4.2.2Pekerjaan Pondasi Batu Kali-Pasang Aantampang Tinggi 20cmM35.005.00Rp359,673.60Rp1,798,368.00-Pasang Pondasi Batu Kali 1Pc:4PsM39.009.00Rp726,640.20Rp6,539,761.80-Beton Lantai K225 Untuk Lantai Ruang Genset t.15cmM35.405.40Rp890,593.94Rp4,809,207.30

I.4.3PEKERJAAN LAIN-LAIN-Stek Kolom D10 BJTD Fy 400 Mpa & < 10 BJTP Fy 240 MPaKg54.6854.68Rp14,331.30Rp783,563.55Rp783,563.55

IIPEKERJAAN STRUKTUR ATASII.1PEKERJAAN STRUKTUR LANTAI 1 (SATU)Rp1,456,758,540.50PENDAHULUANRp41,584,571.77-Pekerjaan Pengukuran Pengukuran Horizontal Beserta VertikalLs1.001.00Rp10,410,000.00Rp10,410,000.00-Pagar Keliling SementaraSudah Ada-Konstruksi Plank Nama ProyekUk.1mx2m Konstruksi Pipa Baja + Baja Siku DilasUnit2.002.00Rp1,500,000.00Rp3,000,000.00-Direksi Keet (Kantor Sementara) Penambahan Yang Sudah AdaM220.0020.00Rp1,408,728.59Rp28,174,571.77

II.1.1PEKERJAAN KOLOMII.1.1.1PEKERJAAN KOLOM TYPE 1 (K1)Rp209,066,851.525,444,449.26-Pembesian D10 BJTD Fy 400 Mpa & < 10 BJTP Fy 240 MPaKg9,114.349,114.34Rp13,176.30Rp120,093,232.57-BekistingKualitas Beton ExposeM2198.66198.66Rp250,933.10Rp49,850,369.65-BetonF'c = 26,4 MPa (K 300), Slump (12 2) cm, W/C = 0,49M338.4038.40Rp1,018,834.62Rp39,123,249.30

II.1.1.2PEKERJAAN KOLOM TYPE 2 (K2)Rp196,684,849.676,208,486.42-Pembesian D10 BJTD Fy 400 Mpa & < 10 BJTP Fy 240 MPaKg8,576.168,576.16Rp13,176.30Rp113,002,014.13-BekistingKualitas Beton ExposeM2204.86204.86Rp250,933.10Rp51,406,154.87-BetonF'c = 26,4 MPa (K 300), Slump (12 2) cm, W/C = 0,49M331.6831.68Rp1,018,834.62Rp32,276,680.67

II.1.1.3PEKERJAAN KOLOM TYPE 3 (K3)Rp8,848,332.676,144,675.46-Pembesian D10 BJTD Fy 400 Mpa & < 10 BJTP Fy 240 MPaKg294.14294.14Rp13,176.30Rp3,875,675.41-BekistingKualitas Beton ExposeM213.9713.97Rp250,933.10Rp3,505,535.41-BetonF'c = 26,4 MPa (K 300), Slump (12 2) cm, W/C = 0,49M31.441.44Rp1,018,834.62Rp1,467,121.85

II.1.2PEKERJAAN BALOKII.1.2.1PEKERJAAN BALOK BI.1Rp218,251,576.035,745,125.59-Pembesian D10 BJTD Fy 400 Mpa & < 10 BJTP Fy 240 MPaKg8,502.408,502.40Rp13,176.30Rp112,030,130.61-BekistingKualitas Beton ExposeM2264.11264.11Rp255,635.60Rp67,515,918.32-BetonF'c = 26,4 MPa (K 300), Slump (12 2) cm, W/C = 0,49M337.9937.99Rp1,018,834.62Rp38,705,527.11

II.1.2.2PEKERJAAN BALOK BI.2Rp89,083,616.995,847,683.93-Pembesian D10 BJTD Fy 400 Mpa & < 10 BJTP Fy 240 MPaKg3,494.733,494.73Rp13,176.30Rp46,047,593.43-BekistingKualitas Beton ExposeM2107.65107.65Rp255,635.60Rp27,519,172.34-BetonF'c = 26,4 MPa (K 300), Slump (12 2) cm, W/C = 0,49M315.2315.23Rp1,018,834.62Rp15,516,851.22

II.1.2.3PEKERJAAN BALOK BA.1Rp45,956,482.475,817,276.26-Pembesian D10 BJTD Fy 400 Mpa & < 10 BJTP Fy 240 MPaKg1,635.481,635.48Rp13,176.30Rp21,549,566.95-BekistingKualitas Beton ExposeM263.9963.99Rp255,635.60Rp16,358,122.04-BetonF'c = 26,4 MPa (K 300), Slump (12 2) cm, W/C = 0,49M37.907.90Rp1,018,834.62Rp8,048,793.48

II.1.2.4PEKERJAAN BALOK BA.2Rp13,992,423.087,153,590.53-Pembesian D10 BJTD Fy 400 Mpa & < 10 BJTP Fy 240 MPaKg556.12556.12Rp13,176.30Rp7,327,601.18-BekistingKualitas Beton ExposeM218.2618.26Rp255,635.60Rp4,667,906.06-BetonF'c = 26,4 MPa (K 300), Slump (12 2) cm, W/C = 0,49M31.961.96Rp1,018,834.62Rp1,996,915.85

II.1.3PEKERJAAN PLAT BETON BERTULANGII.1.3.1PEKERJAAN PLAT S1Rp397,310,867.625,749,031.05-Pembesian D10 BJTD Fy 400 Mpa & < 10 BJTP Fy 240 MPaKg12,402.7912,402.79Rp13,176.30Rp163,422,819.86-BekistingKualitas Beton ExposeM2601.12601.12Rp271,953.00Rp163,476,387.36-BetonF'c = 26,4 MPa (K 300), Slump (12 2) cm, W/C = 0,49M369.1169.11Rp1,018,834.62Rp70,411,660.39

II.1.4PEKERJAAN DINDING BETONII.1.4.1PEKERJAAN DINDING LIFTRp86,383,621.266,036,591.28-Pembesian D10 BJTD Fy 400 Mpa & < 10 BJTP Fy 240 MPaKg3,174.983,174.98Rp13,176.30Rp41,834,473.10-BekistingKualitas Beton ExposeM2146.76146.76Rp204,208.40Rp29,969,624.78-BetonF'c = 26,4 MPa (K 300), Slump (12 2) cm, W/C = 0,49M314.3114.31Rp1,018,834.62Rp14,579,523.37

II.1.4.2PEKERJAAN SHEAR WALLRp15,629,209.635,875,642.72-Pembesian D10 BJTD Fy 400 Mpa & < 10 BJTP Fy 240 MPaKg568.23568.23Rp13,176.30Rp7,487,166.11-BekistingKualitas Beton ExposeM226.6026.60Rp204,208.40Rp5,431,943.44-BetonF'c = 26,4 MPa (K 300), Slump (12 2) cm, W/C = 0,49M32.662.66Rp1,018,834.62Rp2,710,100.08

II.1.5PEKERJAAN TANGGARp29,594,567.795,909,930.46-Pembesian D10 BJTD Fy 400 Mpa & < 10 BJTP Fy 240 MPaKg1,112.041,112.04Rp13,176.30Rp14,652,567.09-BekistingKualitas Beton ExposeM241.6641.66Rp236,141.13Rp9,837,639.27-BetonF'c = 26,4 MPa (K 300), Slump (12 2) cm, W/C = 0,49M35.015.01Rp1,018,834.62Rp5,104,361.43

II.1.6PEKERJAAN STRUKTUR ENTRANCEII.1.6.1PEKERJAAN ENTRANCE (E)Rp35,825,116.79II.1.6.1aPEKERJAAN BADAN TEBAL 20CM-Pembesian D10 BJTD Fy 400 Mpa & < 10 BJTP Fy 240 MPaKg364.99364.99Rp13,176.30Rp4,809,215.915,052,458.15-Bekisting DindingKualitas Beton ExposeM240.2540.25Rp204,208.40Rp8,219,388.10-BetonF'c = 26,4 MPa (K 300), Slump (12 2) cm, W/C = 0,49M33.233.23Rp1,018,834.62Rp3,290,835.81

II.1.6.1bPEKERJAAN PLAT S2 TEBAL 10 CM0.0-Pembesian D10 BJTD Fy 400 Mpa & < 10 BJTP Fy 240 MPaKg379.23379.23Rp13,176.30Rp4,996,846.355,680,845.12-Bekisting PlatKualitas Beton ExposeM221.7421.74Rp271,953.00Rp5,912,258.22-BetonF'c = 26,4 MPa (K 300), Slump (12 2) cm, W/C = 0,49M32.342.34Rp1,018,834.62Rp2,384,073.00

II.1.6.1cPEKERJAAN WATERPROOFINGWaterproofing Membrane Coating tebal 4mm + Aci KasarM221.5521.55Rp208,739.59Rp4,498,338.083,008,684.64II.1.6.1dPEKERJAAN SCREEDINGM221.5521.55Rp49,940.33Rp1,076,214.11II.1.6.1ePASANG ROOF DRAIN Outlet 2" (50mm) Setara RFS01 Brass Bh2.002.00Rp221,408.55Rp442,817.10II.1.6.1fPASANG INSTALASI AIR HUJANPipa Pvc Type AW Diameter 2" beserta fi