HARGA SATUAN BAHAN DAN UPAHPROYEK PEMBANGUNAN TOWER RADAR CUACA UNTUK STAMET BANJARMASIN

NO.

URAIAN

SATUAN

HARGA SATUAN

1 2 3 4 5 6 7

Pekerja Tukang batu Tukang kayu Tukang besi Tukang cat Kepala tukang kayu, batu, besi, cat Mandor

Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr

Rp. Rp. Rp. Rp. Rp. Rp. Rp.

55,000.00 75,000.00 75,000.00 75,000.00 75,000.00 85,000.00 100,000.00

HARGA SATUAN BAHANPROYEK PEMBANGUNAN TOWER RADAR CUACA UNTUK STAMET BANJARMASIN

NO.

URAIAN

SATUAN

HARGA SATUAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Kayu (balok) Paku 5 s/d 7 Tripleks 9 mm PC (50 kg) Pasir pasang Cat dan pengecer Seng Gelombang BJLS 28 (80x180) Bata merah pasir urug Batu belah / kali Gybsum board 9 mm Rangka hollow Keramik lantai Plint keramik Wastafel lngkap Closed Profil gybsum Keramik dinding

m3 kg lbr zak m3 kg lbr bh m3 m3 lbr m2 m2 bh bh bh m' m2

Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.

2,250,000.00 15,000.00 120,000.00 50,000.00 150,000.00 85,000.00 41,900.00 350.00 130,000.00 130,000.00 95,000.00 50,000.00 125,000.00 15,000.00 1,000,000.00 2,640,000.00 12,500.00 135,000.00

ANALISA HARGA SATUANPROYEK PEMBANGUNAN TOWER RADAR CUACA UNTUK STAMET BANJARMASIN

NO.

URAIAN

SAT.

INDEK

HARGA SATUAN BAHAN

JUMLAH UPAH

JUMLAH HARGA BAHAN/UPAH

Pekerjaan papan nama

Kayu (balok) Paku 5 s/d 7 Tripleks 9 mm PC (50 kg) Pasir pasang Cat dan pengecer Peralatan Ongkos pasang Jumlah Harga Dibulatkan 1 m2 pengukuran Tukang batu terampil Pekerja terampil Peralatan Jumlah Harga Dibulatkan

m3 kg lbr zak m3 kg ls ls

0.06 0.45 1.00 0.37 0.20 0.76 1.00 1.00

2,250,000.00 15,000.00 120,000.00 50,000.00 150,000.00 85,000.00 35,000.00 162,000.00

135,000.00 6,750.00 120,000.00 18,500.00 30,000.00 64,600.00 35,000.00 162,000.00 409,850.00 162,000.00 571,850.00 571,800.00

Org Org ls

0.01 0.02 1.00

75,000.00 55,000.00 2,000.00

750.00 1,100.00 2,000.00 2,000.00 1,850.00 3,850.00 3,800.00

1m2 bowplank Kayu (balok) Papan Terentang Paku 5 s/d 7 Ongkos Pasang Jumlah Harga Dibulatkan 1m2 gudang material Kayu (balok) Paku 5 s/d 7 Seng Gelombang BJLS 28 (80x180) Tripleks 3 mm PC (50 kg) Pasir pasang Bata merah Peralatan Ongkos pasang Jumlah Harga Dibulatkan 1 m2 pagar pengaman proyek Kayu (balok) Borneo Super Paku 5 s/d 7 Pengecatan Cat Minyak bagian luar Seng Gelombang BJLS 28 (80X180 CM) Ongkos pasang Jumlah Harga Dibulatkan 1m3 galian tanah sampai 1 m Pekerja setengah terampil Mandor Alat Bantu Jumlah Harga

m3 lbr kg org

0.01 0.25 0.04 1.00

2,250,000.00 35,000.00 15,000.00 1,650.00

22,500.00 8,837.50 570.00 1,650.00 31,907.50 1,650.00 33,557.50 33,500.00

m3 kg lbr lbr zak m3 bh ls ls

0.06 0.25 1.05 0.50 0.10 0.20 60.00 1.00 1.00

2,250,000.00 11,500.00 41,900.00 42,000.00 50,000.00 150,000.00 300.00 3,000.00 60,000.00

135,000.00 2,875.00 43,995.00 21,000.00 5,000.00 30,000.00 18,000.00 3,000.00 60,000.00 258,870.00 60,000.00 318,870.00 318,800.00

m3 kg kg lbr ls

0.04 0.20 0.40 1.43 1.00

2,250,000.00 11,500.00 30,000.00 41,900.00 31,000.00

81,000.00 2,300.00 12,000.00 59,917.00 31,000.00 155,217.00 31,000.00 186,217.00 186,200.00

Org Org ls

0.53 0.05 1.00

55,000.00 100,000.00 1,000.00

28,930.00 5,200.00 1,000.00 1,000.00 34,130.00 35,130.00

3

ANALISA HARGA SATUANPROYEK PEMBANGUNAN TOWER RADAR CUACA UNTUK STAMET BANJARMASIN

NO.

URAIAN

SAT.

INDEK

HARGA SATUAN BAHAN

JUMLAH UPAH

JUMLAH HARGA BAHAN/UPAH 35,100.00

Dibulatkan 1m3 galian tanah 2-4 m Pekerja setengah terampil Mandor Alat Bantu Jumlah Harga Dibulatkan 1 m3 urugan pasir pasir urug Pekerja kasar Mandor Alat bantu Jumlah Harga Dibulatkan 1 m3 urugan kembali Pekerja kasar Mandor Alat Bantu Jumlah Harga Dibulatkan 1m3 urugan pasir bawah pondasi Pasir urug Pekerja kasar Mandor Jumlah Harga Dibulatkan 1m3 aanstamping batu kali Batu belah / kali Pasir urug Pekerja Tukang batu setengah terampil Kepala tukang batu Mandor Jumlah Harga Dibulatkan 1 m3 pasangan batu kali Batu belah / kali Semen PC Pasir Pasang Pekerja Tukang batu setengah terampil Kepala tukang batu Mandor Jumlah Harga Dibulatkan 1 m2 pasangan bata 1:3 Bata merah Semen

Org Org ls

1.15 0.12 1.00

55,000.00 100,000.00 3,000.00

63,415.00 11,500.00 3,000.00 3,000.00 74,915.00 77,915.00 77,900.00

m3 org org ls

1.20 0.25 0.01 1.00

130,000.00 55,000.00 100,000.00 750.00

156,000.00 13,750.00 1,000.00 750.00 156,750.00 14,750.00 171,500.00 171,500.00

Org Org ls

0.45 0.01 1.00

55,000.00 100,000.00 3,000.00

24,750.00 1,000.00 3,000.00 3,000.00 25,750.00 28,750.00 28,700.00

m3 org org

1.20 0.30 0.01

130,000.00 55,000.00 100,000.00

156,000.00 16,500.00 1,000.00 156,000.00 17,500.00 173,500.00 173,500.00

m3 m3 org org org org

1.20 0.40 1.13 0.56 0.08 0.06

130,000.00 130,000.00 55,000.00 65,000.00 75,000.00 100,000.00

156,000.00 52,000.00 61,875.00 36,562.50 5,625.00 5,630.00 208,000.00 109,692.50 317,692.50 317,600.00

m3 zak m3 org org org org

1.20 2.50 0.42 2.25 1.13 0.11 0.02

130,000.00 50,000.00 150,000.00 55,000.00 65,000.00 75,000.00 100,000.00

156,000.00 125,000.00 63,000.00 123,750.00 73,125.00 8,437.50 1,690.00 344,000.00 207,002.50 551,002.50 527,700.00

bh zak

70.00 0.68

350.00 50,000.00

24,500.00 34,000.00

4

ANALISA HARGA SATUANPROYEK PEMBANGUNAN TOWER RADAR CUACA UNTUK STAMET BANJARMASIN

NO.

URAIAN

SAT.

INDEK

HARGA SATUAN BAHAN

JUMLAH UPAH

JUMLAH HARGA BAHAN/UPAH

Pasir pasang Pekerja Tukang batu setengah terampil Kepala Tukang batu Mandor Jumlah Harga Dibulatkan

m3 org org org org

0.05 0.43 0.21 0.02 0.01

150,000.00 55,000.00 65,000.00 75,000.00 100,000.00

7,050.00 23,595.00 13,910.00 1,575.00 1,100.00 40,180.00

65,550.00

105,730.00 105,700.00

1 m2 pasangan bata 1:4 Bata merah Semen Pasir pasang Pekerja setengah terampil Tukang batu setengah terampil Kepala Tukang batu Mandor Jumlah Harga Dibulatkan 1 m2 Plesteran Semen Pasir pasang Pekerja setengah terampil Tukang batu setengah terampil Kepala Tukang batu Mandor Jumlah Harga Dibulatkan 1 m2 Acian Semen Pekerja Tukang batu Kepala Tukang batu Mandor Jumlah Harga Dibulatkan

bh zak m3 org org org org

70.00 0.42 0.06 0.32 0.18 0.02 0.01

350.00 50,000.00 150,000.00 55,000.00 65,000.00 75,000.00 100,000.00

24,500.00 20,960.00 8,700.00 17,699.00 11,732.50 1,185.00 830.00 31,446.50

54,160.00

85,606.50 85,600.00

zak m3 org org org org

0.13 0.02 0.29 0.21 0.02 0.02

50,000.00 150,000.00 55,000.00 65,000.00 75,000.00 100,000.00

6,520.00 2,850.00 15,730.00 13,910.00 1,575.00 2,000.00 33,215.00

9,370.00

42,585.00 42,500.00

zak org org org org

0.08 0.14 0.11 0.01 0.01

50,000.00 55,000.00 75,000.00 75,000.00 100,000.00

4,000.00 7,865.00 8,025.00 787.50 1,050.00 17,727.50

4,000.00

21,727.50 21,700.00

Pas. Plafond Gybsum tiap 1.00 m2 Gybsum board 9 mm Rangka hollow Pekerja Tukang kayu Kepala tukang kayu Mandor

lbr m2 Org/Hr Org/Hr Org/Hr Org/Hr Jumlah

0.600 1.00 0.10 0.05 0.005 0.005

95,000.00 33,145.00 55,000.00 75,000.00 85,000.00 100,000.00

57,000.00 33,145.00 5,500.00 3,750.00 425.00 500.00 90,145.00 10,175.00

57,000.00 33,145.00 5,500.00 3,750.00 425.00 500.00 100,320.00 131,250.00 16,000.00 8,550.00 22,480.00 14,300.00 9,750.00 1,105.00 1,300.00 204,735.00

Pas. Lantai Keramik Keramik lantai Semen PC Pasir pasang Coating Pekerja Tukang batu Kepala tukang batu Mandor

m2 kg m3 m2 Org/Hr Org/Hr Org/Hr Org/Hr Jumlah

1.050 10.00 0.045 1.05 0.26 0.130 0.013 0.013

125,000.00 1,600.00 190,000.00 21,409.52 55,000.00 75,000.00 85,000.00 100,000.00

131,250.00 16,000.00 8,550.00 22,480.00 14,300.00 9,750.00 1,105.00 1,300.00 178,280.00 26,455.00

5

ANALISA HARGA SATUANPROYEK PEMBANGUNAN TOWER RADAR CUACA UNTUK STAMET BANJARMASIN

NO.

URAIAN

SAT.

INDEK

HARGA SATUAN BAHAN

JUMLAH UPAH

JUMLAH HARGA BAHAN/UPAH

Pas. Plint Keramik Plint keramik Semen PC Pasir pasang Coating Pekerja Tukang batu Kepala tukang batu Mandor

bh kg m3 m2 Org/Hr Org/Hr Org/Hr Org/Hr Jumlah

2.20 1.20 0.003 0.10 0.08 0.050 0.009 0.005

15,000.00 1,600.00 190,000.00 21,409.52 55,000.00 75,000.00 85,000.00 100,000.00

33,000.00 1,920.00 570.00 2,140.95 4,125.00 3,750.00 765.00 500.00 37,630.95 9,140.00

33,000.00 1,920.00 570.00 2,140.95 4,125.00 3,750.00 765.00 500.00 46,770.95

Pas. Wastafel Wastafel lngkap Pekerja Tukang batu Kepala tukang batu Mandor

bh Org/Hr Org/Hr Org/Hr Org/Hr Jumlah

1.00 0.75 0.85 0.085 0.01

1,000,000.00 55,000.00 75,000.00 85,000.00 100,000.00

1,000,000.00 41,250.00 63,750.00 7,225.00 1,000.00 1,000,000.00 113,225.00

1,000,000.00 41,250.00 63,750.00 7,225.00 1,000.00 1,113,225.00

Pas. Closed Closed Pekerja Tukang batu Kepala tukang batu Mandor

bh Org/Hr Org/Hr Org/Hr Org/Hr Jumlah

1.00 0.75 0.85 0.085 0.01

2,640,000.00 55,000.00 75,000.00 85,000.00 100,000.00

2,640,000.00 41,250.00 63,750.00 7,225.00 1,000.00 2,640,000.00 113,225.00

2,640,000.00 41,250.00 63,750.00 7,225.00 1,000.00 2,753,225.00

Pas. Dinding gypsumtiap 1.00 m2 Rangka hollow Gipsum tebal 9 mm Paku sekrup Pekerja Tukang kayu Kepala tukang kayu Mandor

m2 bh m3 Org/Hr Org/Hr Org/Hr Org/Hr Jumlah

1.00 1.20 4.00 0.50 0.65 0.065 0.030

50,000.00 95,000.00 5,000.00 55,000.00 75,000.00 85,000.00 100,000.00

50,000.00 114,000.00 20,000.00 27,500.00 48,750.00 5,525.00 3,000.00 184,000.00 84,775.00

50,000.00 114,000.00 20,000.00 27,500.00 48,750.00 5,525.00 3,000.00 268,775.00

Lis Profil Gybsum tiap 1.00 m' Profil gybsum Paku/ripet Upah pasang

m' bh m' Jumlah

1.10 2.00 1.00

12,500.00 1,500.00 12,850.00

13,750.00 3,000.00 12,850.00 16,750.00 12,850.00

13,750.00 3,000.00 12,850.00 29,600.00 141,750.00 17,600.00 10,350.00 22,479.45 16,500.00 11,250.00 1,275.00 1,500.00 222,704.45

Pas. Dinding keramik Keramik dinding Semen PC + Cor nat Pasir pasang Coating Pekerja Tukang batu Kepala tukang batu Mandor

m2 kg m3 m2 Org/Hr Org/Hr Org/Hr Org/Hr Jumlah

1.05 11.00 0.05 1.05 0.30 0.15 0.015 0.015

135,000.00 1,600.00 230,000.00 21,409.00 55,000.00 75,000.00 85,000.00 100,000.00

141,750.00 17,600.00 10,350.00 22,479.45 16,500.00 11,250.00 1,275.00 1,500.00 192,179.45 30,525.00

6

BQ PROYEK PEMBAGUNAN TOWER RADAR CUACA UNTUK STAMET TARAKAN

NO I 1 2 3 4 5 6 7 8 9 10 11

URAIAN PEKERJAAN Pekerjaan persiapan Papan nama proyek Pagar Sementara dari Seng Gelombang Pengukuran & Pemasangan Bowplank Kantor Direksi Keet Gudang Semen dan Alat - alat Bedeng Pekerja Membersihkan Lapangan dan Perataan Listrik kerja Air kerja Mobilisasi dan demobilisasi Anti rayap Sub total I

SAT bh m m m2 m2 m2 m2 ls ls ls m

VOL 1.00 30.00 70.00 11.52 12.50 12.00 45.00 1.00 1.00 1.00 50.00

HARGA SATUAN

TOTAL HARGA

II II.1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 II.2 1 2 3 4 5

Pekerjaan Struktur Pekerjaan Struktur Tower Radar Pek gali tanah untuk pondasi dalam 3 m Pek urug tanah bekas galian Pek urug pasir di bawah pondasi Pek pas Lantai Kerja Bawah Pondasi t. 5cm Pek Pondasi Buis Diameter 80 cm t = 200 cm (12) Pek Pondasi Buis Diameter 40 cm t = 200 cm (4) Pek Footing Pondasi dan Plat Jalur Pek pas Sloof TB 1 (30x50) Pek pas Sloof TB 2 (20x25) Pek urug tanah di bawah lantai Pek urug pasir di bawah lantai Pek pas Kolom 45X45 cm(K3) Pek pas Kolom 15X30 cm(K2) Pek pas Kolom Praktis uk. 15/15 Pek pas Balok 20x30 cm (B1) lantai 2 Pek pas Balok 30x50 cm (B2) lantai 2 Pek pas Balok 15 x 30 cm (B3) lantai 2 Pek pas Plat Lantai 2 Pek pas kanopi beton depan Pek pas balok latai & plat kanopi jendela Pek pas Balok 20x30 cm (B1) lantai 3 Pek pas Balok 30x50 cm (B2) lantai 3 Pek pas Plat Lantai 3 Pek pas balok latai & plat kanopi jendela Pek pas Balok 20x30 cm (B1) lantai 4 Pek pas Balok 30x50 cm (B2) lantai 4 Pek pas Balok 15 x 30 cm (B3) lantai 4 Pek pas Plat Lantai 4 Pek pas balok latai & plat kanopi jendela Pek pas Balok 30x50 cm (B2) lantai atap Pek pas Balok 20x30 cm (B1) lantai atap Pek pas Balok 15 x 30 cm (B3) lantai atap Pek pas Plat Lantai atap Pek Tangga beton tower radar Pekerjaan Struktur Rumah Genset Pek galian tanah pondasi batu kali rumah genset Pek pas batu kali Rumah Genset Pek pas Sloof Genset (150 x 400 cm) Pek pas Kolom Utama 20 x 20 cm Pek pas balok Genset 15 x 40 cm

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

130.00 65.00 4.32 2.16 15.00 3.00 6.30 4.80 1.60 64.00 6.40 26.00 0.90 0.63 2.00 4.20 0.18 7.00 0.40 0.31 2.00 4.20 3.48 0.31 2.00 4.20 1.20 6.20 0.31 4.20 2.00 1.20 6.20 5.47 8.40 6.72 0.84 0.70 1.50

7

BQ PROYEK PEMBAGUNAN TOWER RADAR CUACA UNTUK STAMET TARAKAN

NO 6 7 8

URAIAN PEKERJAAN Pek Pas plat atap rumah genset Pek Pas plat kanopi & balok latai diatas pintu & jendela Pekerjaan Pondasi dudukan Genset Sub total II

SAT m3 m3 m3

VOL 3.20 0.50 0.60

HARGA SATUAN

TOTAL HARGA

III III.1 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Pekerjaan Arsitektur Pekerjaan pasangan Pasangan bata lantai 1 (1:3) Plesteran lantai 1 (1:3) Pasangan bata lantai 1 (1:4) Plesteran lantai 1 (1:4) Acian lantai 1 Pasangan bata lantai 2 (1:4) Plesteran lantai 2 (1:4) Acian lantai 2 Pasangan bata lantai 3 (1:4) Plesteran lantai 3 (1:4) Acian lantai 3 Pasangan bata lantai 4 (1:4) Plesteran lantai 4 (1:4) Acian lantai 4 Sub total III.1

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

35.70 35.70 129.00 257.04 257.04 72.00 144.00 144.00 93.00 186.00 186.00 108.00 194.00 194.00

III.2 1 2 3 4 5 6 7 8 9 10

Pekerjaan lantai Pekerjaan keramik lantai 1 Pekerjaan keramik lantai 2 Pekerjaan keramik lantai 3 Pekerjaan keramik lantai 4 Pekerjaan lantai keramik teras depan lantai 1 Pekerjaan lantai teras lantai 4 Pekerjaan lantai keramik tangga Pekerjaan keramik toilet lantai 1 Pekerjaan keramik toilet lantai 3 Pekerjaan plint lantai Sub total III.2

m2 m2 m2 m2 m2 m2 m2 m2 m2 m

67.80 28.00 28.00 28.00 4.00 21.00 36.00 2.00 2.00 110.00

III.3 1 2 3

Pekerjaan dinding Pekerjaan partisi Gypsum lantai 1 dinding keramik toilet lantai 1 dinding keramik toilet lantai 3 Sub total III.3

m2 m2 m2

33.25 18.75 18.25

III.4 1 2 3 4 5 6 7 8

Pekerjaan langit-langit Pekerjaan plafond gypsum lantai 1 Pekerjaan list plafond lantai 1 Pekerjaan plafond gypsum lantai 2 Pekerjaan list plafond lantai 2 Pekerjaan plafond gypsum lantai 3 Pekerjaan list plafond lantai 3 Pekerjaan plafond gypsum lantai 4 Pekerjaan list plafond lantai 4 Sub total III.4

m2 m m2 m m2 m m2 m

32.00 64.00 28.00 20.00 28.00 20.00 30.00 40.00

8

BQ PROYEK PEMBAGUNAN TOWER RADAR CUACA UNTUK STAMET TARAKAN

NO III.5 1 2 3 4 5 6 7 8 9

URAIAN PEKERJAAN Pekerjaan kusen daun pintu dan jendela Pintu Swing kaca 2 Daun (Type PJ1) Pintu Swing 2 Daun (Type P1) Pintu kaca 1 Daun (Type P2) Pintu 1 Daun (Type P3) Pintu Kaca 1 Daun (Type P4) Pintu PVC (P5) lengkap dengan acessoris Jendela jungkit (Type J1) 15 unit Bouvenlight kaca mati (Type BV) 2 unit Pintu Besi Plat R. Genset Sub total III.5

SAT

VOL

HARGA SATUAN

TOTAL HARGA

unit unit unit unit unit unit unit unit ls

1.00 1.00 1.00 2.00 1.00 2.00 12.00 1.00 1.00

III.6 1 2 3 4 5 6 7 8 9

Pekerjaan pengecatan Pengecatan dinding dalam lantai 1 Pengecatan dinding dalam lantai 2 Pengecatan dinding dalam lantai 3 Pengecatan dinding dalam lantai 4 Pengecatan dinding luar lantai 1 Pengecatan dinding luar lantai 2 Pengecatan dinding luar lantai 3 Pengecatan dinding luar lantai 4 Pengecatan plafond Sub total III.6

m2 m2 m2 m2 m2 m2 m2 m2 m2

150.00 72.00 80.00 75.00 172.00 72.00 72.00 75.00 112.00

III.7

Pekerjaan waterproofing Sub total III.7

m2

117.00

III.8 1 2 3 4 5 6

Pekerjaan Lain-lain Logo BMKG Tangga Maintanance Railing Tangga Railing Balkon lantai 2 & 4 Railing lantai atap Pek jendela kerawang untuk genset Sub total III.9

ls m2 m2 m2 m2 m2

1.00 5.40 26.10 52.20 28.00 9.00

IV 1 2 3 4 5 1 2 3 4 5 6 1 2

PEKERJAAN ELEKTRIKAL PEKERJAAN PANEL LISTRIK Panel SDP ( Sub Distribution Panel ) Panel PL-1 (Lantai Satu) Panel PL-2 (Lantai Dua) Panel PL-3 (Lantai Tiga) Panel PL-4 (Lantai Empat) INSTALASI KABEL Kabel NYFGBY 4 x 16 mm + BC 10 mm Kabel NYY 4 x 4 mm + BC 4 mm dari SDP ke PL-1 Kabel NYY 4 x 4 mm SDP ke PL-2 Kabel NYY 4 x 4 mm SDP ke PL-3 Kabel NYY 4 x 6 mm SDP ke PL-4 Kabel NYY 3 x 4 mm + BC 4 mm dari SDP ke Pompa Air INSTALLASI TITIK CAHAYA + STOP KONTAK Instalasi titik cahaya Instalasi Stop Kontak

unit unit unit unit unit m m m m m m titik titik

1.00 1.00 1.00 1.00 1.00 20.00 5.00 10.00 15.00 20.00 40.00 66.00 16.00

9

BQ PROYEK PEMBAGUNAN TOWER RADAR CUACA UNTUK STAMET TARAKAN

NO 3 4 5 1 2 3 4 5 6 7 8 1

URAIAN PEKERJAAN Instalasi Stop Kontak AC Saklar Instalasi Exhausfan ARMATURE Lampu neon dobel Lampu down light Lampu baret Unit AC 2 PK Exhausfan Stok Kontak Stok Kontak AC Saklar Seri INSTALASI PENANGKAL PETIR grounding + Penangkal Petir Sub total IV

SAT titik titik titik bh bh bh bh bh bh bh bh bh

VOL 3.00 12.00 1.00 28.00 13.00 18.00 3.00 1.00 24.00 3.00 3.00 1.00

HARGA SATUAN

TOTAL HARGA

V 1 2 3 4

PEKERJAAN MEKANIKAL Septic tank dan Rembesan ST-5 Pas. Pompa air 450w + kerangkeng komplit Reservoir 500 liter Instalasi pemadam kebakaran APAR INSTALASI AIR BERSIH PVC Class AW dia 32 PVC Class AW dia 25 PVC Class AW dia 15 PVC Class AW dia 20 INSTALASI AIR KOTOR PVC Class AW dia. 80 air hujan PVC Class AW dia 100 PVC Class AW dia 80 PVC Class AW dia 40 INSTALASI SEPTICTANK PVC Class AW dia 100 PEKERJAAN SANITARY Closet duduk ex. TOTO CW 420 J Wastafel ex. TOTO Pas Jet washer Pas. tempat sabun Pas. Gantungan pakaian Pasang kaca cermin bevel Pasang floor drain & roof drain Pasang kran dinding Sub total V

unit unit unit unit

1.00 1.00 1.00 4.00

1 2 3 4 1 2 3 4 1 1 2 3 4 5 6 7 8

m1 m1 m1 m2 m1 m1 m2 m3 m1 bh bh bh bh bh bh bh bh

25.000 10.000 20.000 20.000 96.000 22.000 4.000 15.000 32.100 2.00 2.00 2.00 2.00 2.00 2.00 14.00 2.00 -

Total PPN 10% Jumlah Total Dibulatkan

-

10

PENAWARAN HARGA PROYEK PEMBAGUNAN TOWER RADAR CUACA UNTUK STAMET BANJARMASIN REKAPITULASI RENCANA ANGGARAN BIAYA NO I II III III.1 III.2 III.3 III.4 III.5 III.6 III.7 III.8 IV V URAIAN PEKERJAAN PEKERJAAN PERSIAPAN PEKERJAAN STRUKTUR PEKERJAAN ARSITEKTUR Pekerjaan pasangan Pekerjaan lantai Pekerjaan dinding Pekerjaan langit-langit Pekerjaan kusen daun pintu dan jendela Pekerjaan pengecatan Pekerjaan waterproofing Pekerjaan Lain-lain PEKERJAAN ELEKTRIKAL PEKERJAAN MEKANIKAL JUMLAH PPN 10 % JUMLAH + PPN DIBULATKAN TOTAL HARGA -

Jakarta, 15 Juni 2011 CV. WIRA MURNI UTAMA

MUHTAR DIREKTUR