bm 015.xls

Upload: ranoadiyoso

Post on 19-Oct-2015

119 views

Category:

Documents


0 download

TRANSCRIPT

Anal BMANALISA PEKERJAAN PENANGANAN JALAN SK.DIRJEN BINA MARGA NO.015/T/BM/1995 NOPEMBER 1995EDISI KEDUA 2011HARGA BAHAN / UPAHJUMLAHNOKODEKOEF.SATURAIANMINIMUMMAKSIMUMMINIMUMMAKSIMUMRpRpRpRp1K.1101m3MEMBUAT PARIT / SALURAN GALIAN TANAH56,203.7060,777.78(menggunakan tenaga manusia)ASUMSI :1. Menggunakan tenaga manusia 100 m / hari5. Menggali & membuang dihitung : 1.5 m3/hari orang2. Dimensi saluran :lebar bawah = 0,50 m6. Penggunaan alat bantu unt 1 bulan / oranglebar atas = 1,30 mkedalaman = 0,6 m (vol. = 0.54 m3)3. Kapasitas pekerjaan : 54,00 m3 / hari4. Hasil galian dibuang sejauh minimal 2 kmpekerja1,323,000.001,417,000.00L.0611.00harimandor45,000.0047,000.0045,000.0047,000.00L.0912.00hariSopir45,000.0055,000.0090,000.00110,000.00L.10136.00haripekerja33,000.0035,000.001,188,000.001,260,000.00material12,000.0015,000.00M.1701.50setAlat Bantu8,000.0010,000.0012,000.0015,000.00Peralatan1,700,000.001,850,000.00E.22110.00jamDump truk170,000.00185,000.001,700,000.001,850,000.0054m33,035,000.003,282,000.002K.1111m3MEMBUAT PARIT / SALURAN GALIAN TANAH (menggunakan alat)16,919.5018,470.00ASUMSI :1. menggunakan alat grader (500 m / hari)2. volume galian saluran tepi jalan 0,8 m33. kapasitas pekerjaan : 400,004. hasil galian dibuang sejauh minimal 2 km5. 3 rit pp / jam / truckpekerja843,000.00937,000.00L.0611.00harimandor45,000.0047,000.0045,000.0047,000.00L.0812.00hariOperator terlatih45,000.0055,000.0090,000.00110,000.00L.0914.00hariSopir45,000.0055,000.00180,000.00220,000.00L.10116.00haripekerja33,000.0035,000.00528,000.00560,000.00material4,800.006,000.00M.1700.60setAlat Bantu8,000.0010,000.004,800.006,000.00peralatan5,920,000.006,445,000.00E.1556.00jammotor grader160,000.00170,000.00960,000.001,020,000.00E.3017.00jamwheel loader160,000.00175,000.001,120,000.001,225,000.00E.21224.00jamdump truck160,000.00175,000.003,840,000.004,200,000.00400m36,767,800.007,388,000.003K.1121m'MEMBUAT PARIT PASANGAN BATU DENGAN ADUKAN216,683.33233,966.67(menggunakan alat)ASUMSI :1. galian parit vol. 0,43 m3 / m5. Bahan-bahan dikirim ke tempat oleh levelansir2. ukuran parit bagian dalam :6. Hasil Produksi 60 m/haritebal 20 cmlebar bawah 0,5 m0.0lebar atas 0,9 mkedalaman 0,6 m3. 40 % Pembuangan hasil galian dg truk biasa, sejauh 1 km4. 60 % dibuang setempatpekerja2,226,000.002,432,000.00L.0616.00harimandor45,000.0047,000.00270,000.00282,000.00L.0912.00harisopir45,000.0055,000.0090,000.00110,000.00L.10136.00haripekerja tak terlatih27,500.0030,000.00990,000.001,080,000.00L.07912.00haritukang batu40,000.0045,000.00480,000.00540,000.00L.10312.00haripekerja33,000.0035,000.00396,000.00420,000.00material9,075,000.009,756,000.00M.1701.50setAlat Bantu8,000.0010,000.0012,000.0015,000.00M.01030.00m3Batu Gunung100,000.00110,000.003,000,000.003,300,000.00M.0417.50m3Pasir Beton170,000.00190,000.001,275,000.001,425,000.00M.080114.00zakPortland semen (40 kg / zak)42,000.0044,000.004,788,000.005,016,000.00peralatan1,700,000.001,850,000.00E.21210.00jamdump truck170,000.00185,000.001,700,000.001,850,000.0060m'13,001,000.0014,038,000.004K.1131m'MEMBUAT PASANGAN BATU PARIT DG PENUTUP BETON BERTULANG640,341.97693,273.85(menggunakan tenaga manusia)ASUMSI4. Slab penutup tebal 5 cm, pembesian 3%1. Hasil kerja 20 m' selesai dalam satu hari5. 80% Tanah galian dibuang dg truk sejauh 1 km2. Item material termasuk tenaga, tukang penggetar beton6. 20% Tanah galian dibuang disekitar.3. Dasar & dinding pas.batu tebal 20 cmpekerja420,000.00462,000.00L.0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L.0911.00hariSopir45,000.0055,000.0045,000.0055,000.00L.10112.00haripekerja tak terlatih27,500.0030,000.00330,000.00360,000.00material11,661,839.4812,653,477.05M.1700.50setAlat Bantu8,000.0010,000.004,000.005,000.0025M.715300.00kgPembesian10,191.2010,811.703,057,360.003,243,510.00K.71017.00m2Bekisting30,000.0036,000.00510,000.00612,000.000.02K.81011.00m3Pasangan Batu (1pc:3ps)486,000.00527,075.005,346,000.005,797,825.001A.2154.00m3Adukan Beton (K.300)686,119.87748,785.512,744,479.482,995,142.0550peralatan725,000.00750,000.00E.2125.00jamtruk bak terbuka 3 t (5 jam kerja)145,000.00150,000.00725,000.00750,000.0020m'12,806,839.4813,865,477.055K.1141m3PEMBUATAN DRAINASE BAWAH TANAH1,217,850.001,265,555.56( MENGGUNAKAN BURUH )ASUMSI1. Hasil 18 m3 / hari atau sekitar 70 m / hari2. Agregat gradasi baik dikirim ketempat pekerjaan oleh leveransir3. 50 % tanah galian dibuang sejauh 1 km4. 50 % tanah galian dibuang setempat (sekitar pekerjaan)Pekerja1,243,500.001,384,000.00L0612.00hariMandor45,000.0047,000.0090,000.0094,000.00L0913.00hariSopir45,000.0055,000.00135,000.00165,000.00L10127.00hariBuruh tak terlatih27,500.0030,000.00742,500.00810,000.00L1034.00hariBuruh semi terlatih36,500.0040,000.00146,000.00160,000.00L0812.00hariOperator terlatih45,000.0055,000.0090,000.00110,000.00L0821.00hariOperator semi terlatih40,000.0045,000.0040,000.0045,000.00Material5,282,800.005,456,000.00M1701.60setAlat Bantu8,000.0010,000.0012,800.0016,000.00M21234.00m3Batu Pecah 3/5155,000.00160,000.005,270,000.005,440,000.00Peralatan15,395,000.0015,940,000.00E0885.00jamStamper 4 HP (5 jam)50,000.0060,000.00250,000.00300,000.00E2215.00jamDump truk ( 3,5 T )/44 HP (5 jam)170,000.00185,000.00850,000.00925,000.00E0013.00jamBulldoser 110 Hp (3 jam)205,000.00220,000.00615,000.00660,000.00E0313.00jamPemecah batu 200 HP (3 jam)500,000.00510,000.001,500,000.001,530,000.00E0523.00jamWhell loader 80 HP (3 jam)160,000.00175,000.00480,000.00525,000.00E21260.00jamDump truk ( 5 T ) - 68 HP (60 jam)195,000.00200,000.0011,700,000.0012,000,000.0018m321,921,300.0022,780,000.006K.1151m'PEMBUATAN PIPA BETON BERTULANG331,814.61355,356.62( MENGGUNAKAN BURUH )ASUMSI1. Beton kelas K175 diaduk ditempat kerja4. Berat tulangan 16,9 kg per m pipahasil kerja 50 kg / hari orang2. Kapasitas pengecoran 6.4 m3/hari5. Buka dan bersihkan cetakan kap 9 pasang perhari: 4 pasang dari 2 orang3. Diameter dalam pipa 60 cm, luar 76 cm, panjang 1 m6. Pipa jadi berat 420 kgPekerja857,000.00934,000.00L0612.00hariMandor45,000.0047,000.0090,000.0094,000.00L0731.00hariTukang batu40,000.0045,000.0040,000.0045,000.00L0811.00hariOperator terlatih45,000.0055,000.0045,000.0055,000.00L10120.00hariBuruh tak terlatih27,500.0030,000.00550,000.00600,000.00L1034.00hariBuruh semi terlatih33,000.0035,000.00132,000.00140,000.00Material9,288,326.089,858,838.28M167608.40kgBesi beton dan Kawat beton10,191.2010,811.706,200,326.086,577,838.28M1707.00setAlat bantu8,000.0010,000.0056,000.0070,000.00M0413.00m3Pasir beton170,000.00190,000.00510,000.00570,000.00M08048.00zakSemen (40 kg)42,000.0044,000.002,016,000.002,112,000.00A1104.60m3Kerikil pecah tersaring110,000.00115,000.00506,000.00529,000.00Peralatan1,800,000.002,000,000.00E0525.00jamWheel Loader 80 HP160,000.00175,000.00800,000.00875,000.00E0895.00jamAlat penggetar beton 4 HP75,000.0080,000.00375,000.00400,000.00E2515.00jamConcrete mixer 125 L / 6 HP75,000.0080,000.00375,000.00400,000.00E3415.00jamPompa air ( 0.5 cm ) 30 m3 / jam50,000.0065,000.00250,000.00325,000.0036m'11,945,326.0812,792,838.287K.1161m'PEMBUATAN PIPA BETON BERTULANG473,893.28505,001.40( MENGGUNAKAN BURUH )ASUMSI1. Beton kelas K175, diaduk ditempat kerja5.Buka dan bersihkan cetakkan : 6 m/pasang/hari : 4 pasang dari 3 orang2. Kapasitas pengecoran 6.4 m3 / hari6. Pipa jadi beratnya 625 kg3. Diameter dalam pipa 80 cm, luar 100 cm panjang 1,0 m7. Pipa diangkat ke tempat pekerjaan, jarak 5 km, 5 rit per hari4. Berat tulangan 26,9 kg/m pipa, hasil kerja 50 kg/orang - hariPekerja1,330,000.001,439,000.00L0612.00hariMandor45,000.0047,000.0090,000.0094,000.00L0731.00hariTukang batu40,000.0045,000.0040,000.0045,000.00L0811.00hariOperator terlatih45,000.0055,000.0045,000.0055,000.00L10124.00hariBuruh tak terlatih27,500.0030,000.00660,000.00720,000.00L10315.00hariBuruh semi terlatih33,000.0035,000.00495,000.00525,000.00Material9,683,438.7210,281,033.52M167645.60kgBesi beton dan kawat beton10,191.2010,811.706,579,438.726,980,033.52M1709.00setAlat bantu8,000.0010,000.0072,000.0090,000.00M0413.00m3Pasir beton170,000.00190,000.00510,000.00570,000.00M08048.00zakSemen (40 kg)42,000.0044,000.002,016,000.002,112,000.00A1104.60m3Kerikil pecah tersaring110,000.00115,000.00506,000.00529,000.00Peralatan360,000.00400,000.00E0521.00jamWhell Loader 80 HP160,000.00175,000.00160,000.00175,000.00E0891.00jamAlat penggetar beton 4 HP75,000.0080,000.0075,000.0080,000.00E2511.00jamConcrete mixer 125 L/6 HP75,000.0080,000.0075,000.0080,000.00E3411.00jamPompa air ( o 5 cm ) 30 m3/jam50,000.0065,000.0050,000.0065,000.0024m'11,373,438.7212,120,033.528K.1171m'PEMBUATAN PIPA BETON BERTULANG808,924.64864,812.24( MENGGUNAKAN BURUH )ASUMSI1. Beton kelas K175 diaduk ditempat kerja4. Penulangan 47.2 kg/m pipa beton dan 50 kg/hari-2. Beton dapat dicor 6.9 m3 / hari5. Membongkar dan membersihkan cetakan : 5 m / pasang / hari ( 4 pasang 24 orang )3. Ukuran pipa beton : diameter luar 1.20 m diameter dalam 1.00 m dan6. Pipa jadi beratnya 800 kgpanjang pipa beton : 1.0 mPekerja1,638,000.001,769,000.00L0612.00hariMandor45,000.0047,000.0090,000.0094,000.00L0731.00hariTukang batu40,000.0045,000.0040,000.0045,000.00L0811.00hariOperator terlatih45,000.0055,000.0045,000.0055,000.00L10128.00hariBuruh tak terlatih27,500.0030,000.00770,000.00840,000.00L10321.00hariBuruh semi terlatih33,000.0035,000.00693,000.00735,000.00Material12,740,492.8013,527,244.80M167944.00kgBesi beton dan kawat beton10,191.2010,811.709,620,492.8010,206,244.80M17011.00setAlat bantu8,000.0010,000.0088,000.00110,000.00M0413.00m3Pasir beton170,000.00190,000.00510,000.00570,000.00M08048.00zakSemen (40 kg)42,000.0044,000.002,016,000.002,112,000.00A1104.60m3Kerikil pecah tersaring110,000.00115,000.00506,000.00529,000.00Peralatan1,800,000.002,000,000.00E0525.00jamWhell Loader 80 HP160,000.00175,000.00800,000.00875,000.00E0895.00jamAlat peanggetar beton 4 HP75,000.0080,000.00375,000.00400,000.00E2515.00jamConcrete 125 L/6 HP75,000.0080,000.00375,000.00400,000.00E3415.00jamPompa air ( o 5 cm ) 30 m3 / jam50,000.0065,000.00250,000.00325,000.0020m'16,178,492.8017,296,244.809K.1181m'PEMBUATAN PIPA BETON BERTULANG2,501,494.032,715,423.93( MENGGUNAKAN BURUH )ASUMSI1. Beton kelas K. 175 diaduk ditempat kerja4. Penulangan 82,6 kg/m, kapasitas 50 kg/orang - hari2. Beton dapat dicor 4,9 m3/hari5. Membuka dan membersihkan cetakan : 5 cm/pasang/hari ( 4 ps @ 4 orang )3. Ukuran pipa beton : diameter luar 1.60 m diameter dalam 1.40 m dan6. Pipa jadi beratnya 800 kgpanjang pipa beton : 1.0 m.Pekerja780,000.00844,000.00L0612.00hariMandor45,000.0047,000.0090,000.0094,000.00L0731.00hariTukang batu40,000.0045,000.0040,000.0045,000.00L10110.00hariBuruh tak teralatih27,500.0030,000.00275,000.00300,000.00L10310.00hariBuruh semi terlatih33,000.0035,000.00330,000.00350,000.00L0911.00hariSopir45,000.0055,000.0045,000.0055,000.00M0256.70m3Material34,392,410.4037,362,358.90M0414.50m3Batu Pecah110,000.00115,000.00495,000.00517,500.00M08090.00kgPasir Beton170,000.00190,000.0015,300,000.0017,100,000.00M17010.00setAlat bantu8,000.0010,000.0080,000.00100,000.00M1671,817.00kgBesi beton dan kawat beton10,191.2010,811.7018,517,410.4019,644,858.90Peralatan2,350,000.002,525,000.00E2525.00jamConcrete mixer 0,25 m3/10 HP75,000.0080,000.00375,000.00400,000.00E08915.00jamAlat penggetar beton 4 HP75,000.0080,000.001,125,000.001,200,000.00E2215.00jamDump truk ( 3,5 T ) /44 Hp170,000.00185,000.00850,000.00925,000.0015m'37,522,410.4040,731,358.9010K.1211m'PASANGAN GORONG - GORONG PIPA BETON 60 CM( PRACETAK TAK416,112.22457,890.51BERTULANG, TANPA KEPALA ( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga manusia ( tak termasuk dinding ujung )4. Pipa - pipa dan bahan beton diangkut ketempat pekerjaan oleh leveransir2. Pipa beton tak bertulang beli ditempat5. Tidak termasuk penggalian dan pemadatan kembali lapisan perkerasan yang ada3. Beton kelas c digunakan untuk alas dan menyelubungi pipa betonPekerja248,500.00267,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L1015.00hariBuruh tak terlatih27,500.0030,000.00137,500.00150,000.00L1032.00hariBuruh semi terlatih33,000.0035,000.0066,000.0070,000.00Material3,080,397.753,396,124.09A2144.50m3Adukan beton kelas c (K.100)531,999.50592,916.462,393,997.752,668,124.09M0318.00bhPipa beton 60 cm85,000.0090,000.00680,000.00720,000.00M1700.80setAlat bantu8,000.0010,000.006,400.008,000.00Peralatan8m'3,328,897.753,663,124.0911K.1221m'PASANG GORONG - GORONG PIPA BETON 60 CM289,362.50314,375.00(PRA CETAK , BERTULANG, TANPA DINDING KEPALA( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga manusia ( tidak termasuk kepala gorong-gorong ).2. Menggunakan pipa beton bertulang 8 m , dipasang dalam 4 hari3. Dasar gorong-gorong dan timbunan sampai dibawah perkerasan digunakan material pilihan.4. Pengiriman bahan - bahan sampai ketempat pekerjaan.5. Tidak termasuk galian dan pemadatan ulang dari perkerasan yang ada.Pekerja248,500.00267,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L1015.00hariBuruh tak terlatih27,500.0030,000.00137,500.00150,000.00L1032.00hariBuruh semi terlatih33,000.0035,000.0066,000.0070,000.00Material1,566,400.001,648,000.00K0128.00m3Kerikil sungai tidak tersaring110,000.00115,000.00880,000.00920,000.00K1158.00m3Pipa beton bertulang 60 cm85,000.0090,000.00680,000.00720,000.00M1700.80setAlat bantu8,000.0010,000.006,400.008,000.00Peralatan500,000.00600,000.00E08810.00jamStamper 4 HP50,000.0060,000.00500,000.00600,000.008m'2,314,900.002,515,000.0012K.1231m'PASANG GORONG - GORONG PIPA BETON 80 CM651,644.44701,111.11( PRA CETAK TAK BERTULANG, TANPA DIDING KEPALA( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga manusia ( tak termasuk dinding kepala )2. Pipa beton tak bertulang beli setempat, panjang 9 m dipasang 4 hari3. Beton kelas c digunakan untuk membungkus pipa dan dasar pipa4. Pengangkutan pipa dan beton sampai ketempat pekerjaan5. Tidak termasuk penggalian dan pemadatan kembali lapis pekerjaan yang adaPekerja356,000.00387,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L1016.00hariBuruh tak terlatih27,500.0030,000.00165,000.00180,000.00L1032.00hariBuruh semi terlatih33,000.0035,000.0066,000.0070,000.00L0731.00hariTukang batu40,000.0045,000.0040,000.0045,000.00L1061.00hariBuruh terlatih40,000.0045,000.0040,000.0045,000.00Material4,708,800.005,023,000.00M0339.00mGorong - gorong tak bertulang 80 cm120,000.00130,000.001,080,000.001,170,000.00M1702.60setAlat bantu8,000.0010,000.0020,800.0026,000.00M0146.80m3Kerikil kali disaring110,000.00115,000.00748,000.00782,000.00M0414.10m3Pasir beton170,000.00190,000.00697,000.00779,000.00M08051.50zaksemen (40 kg)42,000.0044,000.002,163,000.002,266,000.00Peralatan800,000.00900,000.00E2524.00jamConcrete mixir 0.25 m3/10 HP75,000.0080,000.00300,000.00320,000.00E0894.00jamAlat penggetar beton 4 HP75,000.0080,000.00300,000.00320,000.00E3414.00jamPompa air ( , 5 cm ) 30 m3 / jam50,000.0065,000.00200,000.00260,000.009m'5,864,800.006,310,000.0013K.1251m'PASANG GORONG - GORONG PIPA BETON @100 CM903,280.00969,450.00PRACETAK TAK BERTULANG( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga manusia ( tak termasuk dinding kepala2. Pipa beton tak bertulang beli setempat , panjang 10 m, dipasang 5 hari3. Beton kelas c digunakan untuk lantai kerja dan penutup pipa4. Pengiriman bahan - bahan sampai ketempat kerja5. Tidak termasuk penggalian dan pemadatan kembali dari perkerasan yang adaPekerja2,355,000.002,545,000.00L06110.00hariMandor45,000.0047,000.00450,000.00470,000.00L10150.00hariBuruh tak terlatih27,500.0030,000.001,375,000.001,500,000.00L10310.00hariBuruh semi terlaltih33,000.0035,000.00330,000.00350,000.00L0735.00hariTukang batu40,000.0045,000.00200,000.00225,000.00Material5,927,800.006,279,500.00M03510.00mGorong - gorong beton 100 cm100,000.00105,000.001,000,000.001,050,000.00M1701.60setAlat bantu8,000.0010,000.0012,800.0016,000.00M0149.30m3Kerikil kali disaring110,000.00115,000.001,023,000.001,069,500.00M0415.60m3Pasir beton170,000.00190,000.00952,000.001,064,000.00M08070.00zakSemen (40 kg)42,000.0044,000.002,940,000.003,080,000.00Peralatan750,000.00870,000.00E2526.00jamConcrete mixer 0,25 m3 / 10 HP75,000.0080,000.00450,000.00480,000.00E3416.00jamPompa air ( 5 cm ) 30 m3 / jam50,000.0065,000.00300,000.00390,000.0010m9,032,800.009,694,500.0014K.1271m'GORONG - GORONG KOTAK PASANGAN BATU DENGAN1,986,777.602,154,461.60PENUTUP BETON BERTULANG ( UKURAN 1.0 M X 1.0 M )( MENGGUNAKAN BURUH )ASUMSI1. Tidak termasuk dinding kepala.2. Lantai dasar dari pasangan batu tebal 40 cm diatas pasir3. Dinding pasangan batu bagiain dalam miring ( kearah tegak )( dasar 50 cm, atas 30 cm, tinggi 100 cm.4. Plat ( 1.8 m x 0.25 m ) bertulang, penulangan 120 kg/m35. Pengiriman material sampai di tempat pekerjaan.6. Tukang - tukang termasuk dalam biaiya produksi7. Sesuai gambar 07 : 1/3Pekerja7,320,000.008,031,000.00L06118.00hariMandor45,000.0047,000.00810,000.00846,000.00L0812.00hariOperator terlatih45,000.0055,000.0090,000.00110,000.00L0911.00hariSopir45,000.0055,000.0045,000.0055,000.00L101162.00hariBuruh tak terlatih27,500.0030,000.004,455,000.004,860,000.00L10612.00hariBuruh terlatih40,000.0045,000.00480,000.00540,000.00L07336.00hariTukang batu40,000.0045,000.001,440,000.001,620,000.00Material9,397,776.0010,033,616.00M1701.50setAlat bantu8,000.0010,000.0012,000.0015,000.00K175480.00kgPembesian10,191.2010,811.704,891,776.005,189,616.00K7105.00m2Begisting30,000.0036,000.00150,000.00180,000.00K2252.00m3Timbunan konstruksi85,000.0095,000.00170,000.00190,000.00M0107.50m3Batu gunung100,000.00110,000.00750,000.00825,000.00M0252.80m3Batu pecah 1 - 2 cm110,000.00115,000.00308,000.00322,000.00M08058.0040kgSemen42,000.0044,000.002,436,000.002,552,000.00M0414.00m3Pasir beton170,000.00190,000.00680,000.00760,000.00Peralatan3,150,000.003,480,000.00E05210.00jamWhell loader 80 HP160,000.00175,000.001,600,000.001,750,000.00E2215.00jamDump truk ( 3,5 T ) / 44 HP170,000.00185,000.00850,000.00925,000.00E2523.00jamConcrete mixer 0,25 m3/ 10HP75,000.0080,000.00225,000.00240,000.00E0893.00jamAlat penggetar beton 4 HP75,000.0080,000.00225,000.00240,000.00E3415.00jamPompa air ( 5 cm ) 30 m3 / jam50,000.0065,000.00250,000.00325,000.0010m'19,867,776.0021,544,616.0015K.1391m3DINDING SAYAP GORONG - GORONG PASANGAN477,912.50525,825.00BATU ( SATU PASANG ) ( MENGGUNAKAN BURUH )ASUMSI1. Tebal rata - rata dinding 45 cm2. Volume seluruhnya 8 m33. Bahan dikirim sampai ketempat pekerjaan4. Dinding berdiri pada plat pasangan batu tebal 23 cm5. Lihat gambar standar D 1/2Pekerja897,500.00979,000.00L0612.00hariMandor45,000.0047,000.0090,000.0094,000.00L10125.00hariBuruh tak terlatih27,500.0030,000.00687,500.00750,000.00L1061.00hariBuruh terlatih40,000.0045,000.0040,000.0045,000.00L0732.00hariTukang batu40,000.0045,000.0080,000.0090,000.00Material2,775,800.003,032,600.00M1703.00setAlat bantu8,000.0010,000.0024,000.0030,000.00K2253.00m3Timbunan Konstruksi85,000.0095,000.00255,000.00285,000.00M0208.00m3Batu belah 15/20110,000.00125,000.00880,000.001,000,000.00M0412.00m3Pasir beton170,000.00190,000.00340,000.00380,000.00M08030.4040kgSemen42,000.0044,000.001,276,800.001,337,600.00Peralatan150,000.00195,000.00E4313.00jamPompa air ( 3 cm ) 30 m3/jam50,000.0065,000.00150,000.00195,000.008m33,823,300.004,206,600.0016K.1401m3DINDING SAYAP GORONG - GORONG BETON BERTULANG1,888,707.142,022,825.00( SATU PASANG ) ( MENGGUNAKAN BURUH )ASUMSI1. M x S x L = 2 m x 2 m x 11 m2. Tembal dinding = 31 cm3. Membuang hasil galian disekitar tempat pekerjaan4. Volume beton dinding sayap 6.66 m35. Pembersihan 745 kg per diinding, dengan kapasitas 100 kg/hari - orang6. Beton struktur kelas A dicampur ditempat pekerjaan7. Bahan beton dikirim ketempat pekerjaan oleh leveransir8. Upah tukang dimasukan dalam biaya produksiPekerja585,500.00639,000.00L0612.00hariMandor45,000.0047,000.0090,000.0094,000.00L10111.00hariBuruh tak terlatih27,500.0030,000.00302,500.00330,000.00L1063.00hariBuruh terlatih40,000.0045,000.00120,000.00135,000.00L0731.00hariTukang batu40,000.0045,000.0040,000.0045,000.00L0821.00hariOperator semi terlatih33,000.0035,000.0033,000.0035,000.00Material24,006,400.0025,625,550.00M1700.70setAlat bantu8,000.0010,000.005,600.007,000.00M7151,500.00kgPembesian10,191.2010,811.7015,286,800.0016,217,550.00K7103.00m2Begisting30,000.0036,000.0090,000.00108,000.00K22516.00m3Timbunan konstruksi85,000.0095,000.001,360,000.001,520,000.00M02510.00m3Batu pecah 1 - 2 cm160,000.00175,000.001,600,000.001,750,000.00M0417.50m3Pasir beton170,000.00190,000.001,275,000.001,425,000.00M080104.5040kgSemen42,000.0044,000.004,389,000.004,598,000.00Peralatan1,850,000.002,055,000.00E25210.00jamConcrete mixer 0,25 m3/10 Hp75,000.0080,000.00750,000.00800,000.00E08910.00jamAlat penggetar beton 4 HP75,000.0080,000.00750,000.00800,000.00E4317.00jamPompa air ( 5 cm ) 30 m3/jam50,000.0065,000.00350,000.00455,000.0014m326,441,900.0028,319,550.0017K.1511mPASANG GORONG - GORONG PIPA BAJA BERGELOMBANG 60 CM1,498,050.001,670,250.00( MENGGUNAKAN BURUH )ASUMSI1. Pengadaan ARMCO sampai ditempat pekerjaan dilakukan oleh Leveransir2. ARMCO : 60 cm, berat bagian - bagian 40 kg / m ( tebal ) 2 mm3. Panjang gorong- gorong 8 m4. Urugan plihan dikirim oleh Leveransir sampai dtempat pekerjaan5. Hasil galian yang tak terpakai dibuang dari tempat pekerjaantruk sejauh 1 km6, Seseuai gambar D8 : 1/2 and 2/2Pekerja887,000.00974,000.00L0612.00hariMandor45,000.0047,000.0090,000.0094,000.00L10118.00hariBuruh tak terlaltih27,500.0030,000.00495,000.00540,000.00L1034.00hariBuruh semi terlatih33,000.0035,000.00132,000.00140,000.00L0912.00hariSopir45,000.0055,000.0090,000.00110,000.00L0732.00haiTukang batu40,000.0045,000.0080,000.0090,000.00Material8,722,400.009,788,000.00M164328.00kgPipa baja gelombang (Armco)24,500.0027,500.008,036,000.009,020,000.009800001100000M1700.80setAlat bantu8,000.0010,000.006,400.008,000.00M0508.00m3Material timbunan / pilihan85,000.0095,000.00680,000.00760,000.00Peralatan2,375,000.002,600,000.00E0875.00jamMesin gilas bergetar 1 ton85,000.0090,000.00425,000.00450,000.00E0885.00jamStamper50,000.0060,000.00250,000.00300,000.00E22110.00jamDump truk 3,5 ton170,000.00185,000.001,700,000.001,850,000.008m'11,984,400.0013,362,000.0018K.2101m2PENGUPASAN TANAH DAN PEMBERSIHAN1,163.331,268.89PADA DAMIJA ( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga manusia ( 9 m x 100 m / hari )2. Hasil kerja 25 m2 / orang - hari )3. mengggunakan alat bantu rata - rata 1 bulan - orang4. Bakarlah sampah ditempat perkerjaanPekerja1,035,000.001,127,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L10136.00hariBuruh tak terlatih27,500.0030,000.00990,000.001,080,000.00Material12,000.0015,000.00M1701.50setAlat bantu8,000.0010,000.0012,000.0015,000.00900m21,047,000.001,142,000.0019K.2111m2PENGUPASAN TANAH DAN PEMBERSIHAN SEMAK488.75525.83PADA DAMIJA ( MENGGUNAKAN ALAT )ASUMSI1. Menggunakan alat berat2 Tidak ada pohon besar dalam damija ( hanya semak - semak )3. Lebar damija 12 m.Pekerja140,000.00152,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0811.00hariOperator terlatih40,000.0045,000.0040,000.0045,000.00L1012.00hariBuruh tak terlatih27,500.0030,000.0055,000.0060,000.00Material8,000.0010,000.00M1701.00setAlat bantu8,000.0010,000.008,000.0010,000.00Peralatan1,025,000.001,100,000.00E0015.00jamBulldoser 110 hp205,000.00220,000.001,025,000.001,100,000.002,400m21,173,000.001,262,000.0020K.2201m3MENGANGKUT MATERIAL UNTUK MENGURUG174,716.67190,683.33GALIAN DIPADATKAN ( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga manusia ( 60 m3 / hari ).2. Di pakai material dari penggalian didaerah jalan atau tempat lainyang diperbolehkan.3. Jarak angkut pp < 4 km ( 1 trip/jam/truk )( 1 trip / jam / truk )4. Peralatan dengan tenaga manusia , tebal perlapis 10 cm5. Pemadatan menggunakan mesingilaskan mesin gilas6. Tidak termasuk pekerjaan persiapan dilokasi pengambilan7. Hasil pemadatan 60 m3Pekerja2,965,000.003,271,000.00L0613.00hariMandor45,000.0047,000.00135,000.00141,000.00L0811.00hariOperator terlatih40,000.0045,000.0040,000.0045,000.00L0917.00hariSopir45,000.0055,000.00315,000.00385,000.00L10190.00hariBuruh tak terlatih27,500.0030,000.002,475,000.002,700,000.00Material48,000.0060,000.00M1706.00setAlat bantu8,000.0010,000.0048,000.0060,000.00Peralatan7,470,000.008,110,000.00E0815.00jamMesin gilas tandem 6 - 10 ton135,000.00150,000.00675,000.00750,000.00E1825.00jamTruk tangki air 68 HP135,000.00140,000.00675,000.00700,000.00E22136.00jamDump truk ( 3,5 T ) / 44 HP170,000.00185,000.006,120,000.006,660,000.0060m310,483,000.0011,441,000.0021K.2211m3MENGANGKUT MATERIAL UNTUK MENGURUG GALIAN72,735.0078,841.67( MENGGUNAKAN ALAT )ASUMSI1. Menggunakan alat berat ( 120 m3 / hari )2. Dipakai material dari penggalian di daerah jalan atautempat lain yang diperbolehkan.3. 2 rit pp / jam / truk.4. Jarak angkut pp < 4 km.5. Kapasitas pemadatan 120 m3 perhari6. Tidak termasuk pekerjaan persiapan dilokasi pengambilan.Pekerja750,000.00857,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0314.00hariOperator terlatih40,000.0045,000.00160,000.00180,000.00L0916.00hariSopir45,000.0055,000.00270,000.00330,000.00L10110.00hariBuruh tak terlatih27,500.0030,000.00275,000.00300,000.00Material3,200.004,000.00M1700.40setAlat bantu8,000.0010,000.003,200.004,000.00Peralatan7,975,000.008,600,000.00E0015.00jamBulldoser 110 hp205,000.00220,000.001,025,000.001,100,000.00E0105.00jamGrader 110 hp160,000.00170,000.00800,000.00850,000.00E0525.00jamWhell Loader 80 HP160,000.00175,000.00800,000.00875,000.00E0825.00jamMesin gilas bergetar 1 ton85,000.0090,000.00425,000.00450,000.00E1525.00jamTruk tangki air 68 HP135,000.00140,000.00675,000.00700,000.00E21225.00jamDump Truk ( 5 T ) - 68 HP170,000.00185,000.004,250,000.004,625,000.00120m38,728,200.009,461,000.0022K.2241m3GALIAN TANAH UNTUK KONSTRUKSI20,600.0022,740.00( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga manusia2. Kapasitas kerja kelompok 50 m3 / hari3. Kedalaman rata - rata galian s/d 3 m.4. Untuk jenis tanah berbatu , harga satuan pekerjaan K.224dikalikan dengan faktor 1,5Pekerja950,000.001,037,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L1062.00hariBuruh terlatih40,000.0045,000.0080,000.0090,000.00L10130.00hariBuruh tak terlatih27,500.0030,000.00825,000.00900,000.00Material80,000.00100,000.00M17010.00setAlat bantu8,000.0010,000.0080,000.00100,000.0050m31,030,000.001,137,000.0023K.2251m3PENIMBUNAN DAN PEMADATAN223,093.33247,000.00( UNTUK JEMBATAN DAN GORONG - GORONG )( MENGGUNAKAN BURUH )ASUMSI1.Bahan timbunan dikirim ke lapangan oleh leveransi2. Timbunan dipadatkan berlapis tebal 10 cmPekerja419,000.00452,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L10110.00hariBuruh tak terlatih27,500.0030,000.00275,000.00300,000.00L1033.00hariBuruh semi terlatih33,000.0035,000.0099,000.00105,000.00Material2,002,400.002,203,000.00M04220.00m3Sirtu100,000.00110,000.002,000,000.002,200,000.00M1700.30setAlat bantu8,000.0010,000.002,400.003,000.00Peralatan925,000.001,050,000.00E9875.00jamMesin gilas bergetar 1 ton85,000.0090,000.00425,000.00450,000.00E08810.00jamStamper 4 HP50,000.0060,000.00500,000.00600,000.0015m33,346,400.003,705,000.0024K.2301m3PENIMBUNAN DAERAH RAWA138,193.33153,466.67( MENGGUNAKAN ALAT )ASUMSI1. Menggunakan peralatan berat ( 120 m3 / hari )2. Material pilihan untuk timbunan dikirim ke tempatpekerjaan sejauh 10 km oleh leveransir3. Pemadatannya mendekati pemadatan untuk L. P. 8Pekerja375,000.00417,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0813.00hariOperator terlatih40,000.0045,000.00120,000.00135,000.00L0911.00hariSopir45,000.0055,000.0045,000.0055,000.00L1016.00hariBuruh tak terlatih27,500.0030,000.00165,000.00180,000.00Material13,603,200.0015,204,000.00M030160.00m3Material timbunan / pilihan85,000.0095,000.0013,600,000.0015,200,000.00M1700.40setAlat bantu8,000.0010,000.003,200.004,000.00Peralatan2,605,000.002,795,000.00E0014.00jamBulldoser 110 HP205,000.00220,000.00820,000.00880,000.00E0805.00jamMesin gilas 3 roda 8 - 10 T110,000.00125,000.00550,000.00625,000.00E0525.00jamMesin gilas bergetar 1 ton85,000.0090,000.00425,000.00450,000.00E1826.00jamTruk tangki air 68 Hp135,000.00140,000.00810,000.00840,000.00120m316,583,200.0018,416,000.0025K.2311m3PENIMBUNAN DI DAERAH RAWA ( PEKERJA )145,278.33161,308.33( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga manusia 120 m3 / hari2. Material pilihan untuk timbunan dikirim ketempat pekerjaanmasing - masing oleh leveransir .sejauh 10 km3. Pemadatannya mendekati pemadatan untuk subbase ( L.P8 )Pekerja2,030,000.002,219,000.00L0612.00hariMandor45,000.0047,000.0090,000.0094,000.00L0812.00hariOperator terlatih40,000.0045,000.0080,000.0090,000.00L0911.00hariSopir45,000.0055,000.0045,000.0055,000.00L10166.00hariPekerja tak terlatih27,500.0030,000.001,815,000.001,980,000.00Material13,618,400.0015,223,000.00M050160.00m3Material urugan pilihan85,000.0095,000.0013,600,000.0015,200,000.00M1702.30setAlat bantu8,000.0010,000.0018,400.0023,000.00Peralatan1,785,000.001,915,000.00E0805.00jamMesin gilas 3 roda 8 - 10 ton110,000.00125,000.00550,000.00625,000.00E0825.00jamMesin gilas bergetar 1 ton85,000.0090,000.00425,000.00450,000.00E1826.00jamTruk tangki air 68 HP135,000.00140,000.00810,000.00840,000.00120m317,433,400.0019,357,000.0026K.2321mPASANGAN CERUCUK KAYU DI RAWA6,689.177,556.25( MENGGUNAKAN BURUH )ASUMSI1. Memakai tenaga orang ( 4 group )2. Cerucuk pendek dipukul dengan tenaga orang( 100 / tiang / hari / group )3 Cerucuk panjang 6 m 15 cm dipotong dan dikirimPekerja797,000.00872,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0732.00hariTukang batu40,000.0045,000.0080,000.0090,000.00L0911.00hariSopir45,000.0055,000.0045,000.0055,000.00L10118.00hariPekerja tak terlatih27,500.0030,000.00495,000.00540,000.00L1034.00hariPekerja semi terlatih33,000.0035,000.00132,000.00140,000.00Material338,400.00376,500.00M16613.00kgPaku jembatan14,000.0014,500.00182,000.00188,500.00M1805.00m2Kayu begisting30,000.0036,000.00150,000.00180,000.00M1700.80setAlat bantu8,000.0010,000.006,400.008,000.00Peralatan470,000.00565,000.00E1911.00jamTrailer 1 ton125,000.00155,000.00125,000.00155,000.00E2211.00jamTruk bak terbuka 3 t - 44 HP145,000.00150,000.00145,000.00150,000.00E3414.00jamPompa air ( 5 cm ) 30 m3 / jam50,000.0065,000.00200,000.00260,000.00240m1,605,400.001,813,500.0027K.2331m2PASANGAN HAMPARAN BATANG KAYU DI RAWA5,175.005,662.50( MENGGUNAKAN BURUH)ASUMSI1. Hamparan anyaman dipotong dan dikirimkan ketempat pekerjaan.2. Hamparan ( diameter 5 m ) diikat dan dipaku diletakan diatas tanah dasar3. Timbunan bahan terpilih dimasukan dalam K332Pekerja441,000.00477,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L10112.00hariPekerja tak terlatih27,500.0030,000.00330,000.00360,000.00L1032.00hariPekerja semi terlatih33,000.0035,000.0066,000.0070,000.00Material594,000.00655,500.00M16625.00kgPaku jembatan14,000.0014,500.00350,000.00362,500.00M1808.00m2Kayu begisting30,000.0036,000.00240,000.00288,000.00M1700.50setAlat bantu8,000.0010,000.004,000.005,000.00200m21,035,000.001,132,500.0028K.3101m3MEMBENTUK BADAN JALAN / SUBGRADE DENGAN TIMBUNAN120,885.93136,811.85( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga buruh.2. Harga material timbunan berdasarkan harga dilokasi pekerjaan.Pekerja1,495,000.001,634,000.00L0612.00hariMandor45,000.0047,000.0090,000.0094,000.00L0811.00hariOperator terlatih40,000.0045,000.0040,000.0045,000.00L0911.00hariSopir45,000.0055,000.0045,000.0055,000.00L10148.00hariBuruh tak terlatih27,500.0030,000.001,320,000.001,440,000.00Material31,564,000.0036,080,000.00M040450.00m3Pasir urug70,000.0080,000.0031,500,000.0036,000,000.00M1708.00setAlat bantu8,000.0010,000.0064,000.0080,000.00Peralatan7,740,000.008,460,000.00E08430.00jamMesin gilas roda karet 8 - 15 t150,000.00170,000.004,500,000.005,100,000.00E18224.00jamTruk tangki air 68 HP135,000.00140,000.003,240,000.003,360,000.00337.50m340,799,000.0046,174,000.0029K.3111m3MEMBENTUK BADAN JALAN / SUBGRADE DENGAN TIMBUNAN114,525.00129,683.33( MENGGUNAKAN ALAT )ASUMSI1. Menggunakan peralatan berat ( 120 m3 / hari )2. Harga material galian berdasarkan harga dilokasi pekerjaanPekerja445,000.00492,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0812.00hariOperator terlatih40,000.0045,000.0080,000.0090,000.00L0911.00hariSopir45,000.0055,000.0045,000.0055,000.00L10110.00hariBuruh tak terlatih27,500.0030,000.00275,000.00300,000.00Material11,208,000.0012,810,000.00M242160.00m3Pasir urug70,000.0080,000.0011,200,000.0012,800,000.00M1711.00setAlat bantu8,000.0010,000.008,000.0010,000.00Peralatan2,090,000.002,260,000.00E0105.00jamGrader 110 HP160,000.00170,000.00800,000.00850,000.00E0845.00jamMesin gilas roda karet 8 - 15 t150,000.00170,000.00750,000.00850,000.00E1824.00jamTruk tangki air 68 HP135,000.00140,000.00540,000.00560,000.00120m313,743,000.0015,562,000.0030K.3201m3MEMBENTUK BADAN JALAN / SUBGRADE DI DAERAH GALIAN88,656.2596,937.50TANAH BIASA ( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga manusia ( 32 m3 / hari )2. 20 % dibuang ditempat , selagi truk tidak ada3. 80 % dibuang dengan 1 truk4. jarak 1 rit pp < 2km5. Penggunaan alat bantu 1 bulan - orang6. Tidak termasuk pemadatan tanah dasar7. T.6 rit pp / jam / trukPekerja1,125,000.001,237,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0912.00hariSopir45,000.0055,000.0090,000.00110,000.00L10136.00hariBuruh tak terlatih27,500.0030,000.00990,000.001,080,000.00Material12,000.0015,000.00M1701.50setalat bantu8,000.0010,000.0012,000.0015,000.00Peralatan1,700,000.001,850,000.00E22110.00jamDump truk ( 3.5 T ) 44 HP170,000.00185,000.001,700,000.001,850,000.0032m32,837,000.003,102,000.0031K.3211m3MEMBENTUK BADAN JALAN / DIDAERAH GALIAN32,545.5035,395.00TANAH BIASA ( MENGGUNAKAN ALAT )ASUMSI1. Menggunakan peralatan berat ( 200 m3 / hari )2. 20 % terbuang ditempat3. 80 % diangkut dan dibuang dengan truk4. 2,5 rit pp / jam / truk5 Jarak 1 rit pp < 2 kmleveransir6. Tidak termasuk pekerjaan pemadatan tanah dasarPekerja482,500.00552,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0813.00hariOperator terlatih40,000.0045,000.00120,000.00135,000.00L0914.00hariSopir45,000.0055,000.00180,000.00220,000.00L1015.00hariBuruh tak terlatih27,500.0030,000.00137,500.00150,000.00Material1,600.002,000.00M1700.20setAlat bantu8,000.0010,000.001,600.002,000.00Peralatan6,025,000.006,525,000.00E0015.00jamBulldoser 110 Hp205,000.00220,000.001,025,000.001,100,000.00E0105.00jamGrader 110 Hp160,000.00170,000.00800,000.00850,000.00E0525.00jamWhell Loader 80 HP160,000.00175,000.00800,000.00875,000.00E21220.00jamDump truk ( 5 T ) - 68 HP170,000.00185,000.003,400,000.003,700,000.00200m36,509,100.007,079,000.0032K.3231mSTABILISASI TANAH / LPB DENGAN KAPUR24,879.6327,114.81( MENGGUNAKAN ALAT )ASUMSI1. Menggunakan alat berat ( 5 m x 500 m / hari2. L.P.B. tanah dasar sudah rata dan dibentuk3. Tractor menggaru dengan 4 lintasan penghamparan 1 lintasanpencampur dan 4 lintasan pp, kemampuan 2500 m3 / jam4. Bahan kapur dikirim oleh leveransir sampai ketempat pekerjaan.5. Pencampuran kapur setebal 20 cm atau 4 % dari volumePekerja3,140,500.003,421,000.00L0613.00hariMandor45,000.0047,000.00135,000.00141,000.00L0811.00hariOperator terlatih40,000.0045,000.0040,000.0045,000.00L0911.00hariSopir45,000.0055,000.0045,000.0055,000.00L10199.00hariBuruh tak terlatih27,500.0030,000.002,722,500.002,970,000.00L1036.00hariBuruh semi terlatih33,000.0035,000.00198,000.00210,000.00Material2,177,000.002,350,000.00M08111.00m3Kapur195,000.00210,000.002,145,000.002,310,000.00M1704.00setAlat bantu8,000.0010,000.0032,000.0040,000.00Peralatan1,400,000.001,550,000.00E0805.00jamMesin gilas 3 roda 8 - 10 T110,000.00125,000.00550,000.00625,000.00E1825.00jamTruk tangki air 68 HP170,000.00185,000.00850,000.00925,000.00270m6,717,500.007,321,000.0033K.3251m3STABILISASI TANAH / LPB DENGAN SEMEN55,221.3358,858.67( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga manusia ( 5 m x 250 / hari2. Badan jalan telah dibentuk3. Tanah digemburkan dengan tenaga manusia sedalam 15cm4. Bahan semen dikirim sampai ditempat kerja oleh leveransir5. Semen dicampuar dengan tanah sedalam 15 cm dan 4 % darivolume dengan tenaga orang.Pekerja4,550,000.004,982,000.00L0616.00hariMandor45,000.0047,000.00270,000.00282,000.00L0812.00hariOperator terlatih40,000.0045,000.0080,000.0090,000.00L0912.00hariSopir45,000.0055,000.0090,000.00110,000.00L101132.00hariBuruh tak terlatih27,500.0030,000.003,630,000.003,960,000.00L10612.00hariBuruh terlatih40,000.0045,000.00480,000.00540,000.00Material13,698,000.0014,360,000.00M080325.00zakSemen (40 kg)42,000.0044,000.0013,650,000.0014,300,000.00M1706.00SetAlat bantu8,000.0010,000.0048,000.0060,000.00Peralatan2,460,000.002,730,000.00E08010.00jamMesin gilas 3 roda 8 - 10 T110,000.00125,000.001,100,000.001,250,000.00E1828.00jamTruk tangki air 68 Hp170,000.00185,000.001,360,000.001,480,000.00375m320,708,000.0022,072,000.0034K.3261m3STABILISASI TANAH / LPB DENGAN SEMEN68,118.0072,314.00( MENGGUNAKAN ALAT )ASUMSI1. Menggunakan peralatan berat 5 m x 500 m / hari2. Tanah dasar dan L.P.B. telah dibentuk sesuai profilnya3. Tractor penggaru dengan 4 lintasan, penghamparanan 4 lintasan, pengahamparan1 lintasan , pencampur dan 4 lintasan pp, kemampuan 3750 m3 / jam4. Bahan semen dikirim ketempat kerja oleh leveransir5. Semen dengan campuran 4 % ( volume ) dicampur sampai sedalam 20 cmPekerja605,000.00672,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0814.00hariOperator terlatih40,000.0045,000.00160,000.00180,000.00L0911.00hariSopir45,000.0055,000.0045,000.0055,000.00L10110.00hariBuruh tak terlatih27,500.0030,000.00275,000.00300,000.00L1062.00hariBuruh terlatih40,000.0045,000.0080,000.0090,000.00Material29,404,000.0030,805,000.00M080700.00zakSemen (40 kg)42,000.0044,000.0029,400,000.0030,800,000.00M1700.50setAlat bantu8,000.0010,000.004,000.005,000.00Peralatan4,050,000.004,680,000.00E0535.00jamWheel Tractor 60 HP160,000.00200,000.00800,000.001,000,000.00E4013.00jamPeralatan tractor dll130,000.00185,000.00390,000.00555,000.00E0105.00jamGrader 110 HP160,000.00170,000.00800,000.00850,000.00E0805.00jamMesin gilas 3 roda 8 - 10 T110,000.00125,000.00550,000.00625,000.00E0845.00jamMesin gilas roda karet 8 - 15 T150,000.00170,000.00750,000.00850,000.00E1914.00jamTrailer gandengan 1 T190,000.00200,000.00760,000.00800,000.00500m334,059,000.0036,157,000.0035K.3411m2PEMADATAN TANAH DASAR780.19858.13( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga orang ( 8 m x 400 m / hari )2. 40 m2 / hari - orang3. Penggunaan alat bantu 1 bulan - orang4. Tenaga dicari ditempatPekerja1,945,000.002,119,000.00L0612.00hariMandor45,000.0047,000.0090,000.0094,000.00L0811.00hariOperator terlatih40,000.0045,000.0040,000.0045,000.00L10166.00hariBuruh tak terlatih27,500.0030,000.001,815,000.001,980,000.00Material1,600.002,000.00M1700.20setAlat bantu8,000.0010,000.001,600.002,000.00Peralatan550,000.00625,000.00E0805.00jamMesin gilas 3 roda 8 - 10 T110,000.00125,000.00550,000.00625,000.003,200m22,496,600.002,746,000.0036K.3421m2PEMADATAN TANAH DASAR464.15507.25( MENGGUNAKAN ALAT )ASUMSI1. Menggunakan alat berat ( 8 m x 500 m /hari )2. Damija dibersihkan dari semak3. Lebar dasar jalan 8 m4. Hasil kerja menyiapkan dasar jalan 500 m / hariPekerja235,000.00257,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0812.00hariOperator terlatih40,000.0045,000.0080,000.0090,000.00L1014.00hariBuruh tak terlatih27,500.0030,000.00110,000.00120,000.00Material1,600.002,000.00M1700.20setAlat bantu8,000.0010,000.001,600.002,000.00Peralatan1,620,000.001,770,000.00E0106.00jamGrader 110 HP160,000.00170,000.00960,000.001,020,000.00E0806.00jamMesin gilas 3 roda 8 - 10 T110,000.00125,000.00660,000.00750,000.004,000m21,856,600.002,029,000.0037K.4101m3MEMBENTUK BAHU JALAN KERAS149,806.25164,395.83( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga orang ( 98 m3 / hari , pemadatan 960m batu jalan2. Material pilihan dikirim sampai tempat pekerjaan oleh leveransir3. Leveransir meletakan material timbunan sepanjang bahu jalan4. 10 cm timbunan padat dibutuhkan pada 1 m lebar bahu jalan5. Penghamparan timbunan denagan tenaga manusia6. Pemadatan dengan mesin gilasPekerja1,938,000.002,109,000.00L0612.00hariMandor45,000.0047,000.0090,000.0094,000.00L10166.00hariBuruh tak terlatih27,500.0030,000.001,815,000.001,980,000.00L1031.00hariBuruh semi terlatih33,000.0035,000.0033,000.0035,000.00Material12,018,400.0013,223,000.00K013120.00m3Kerikil sungai tanpa di saring100,000.00110,000.0012,000,000.0013,200,000.00M1702.30setAlat bantu8,000.0010,000.0018,400.0023,000.00Peralatan425,000.00450,000.00E0875.00jamMesin gilas bergetar 1 ton85,000.0090,000.00425,000.00450,000.0096m314,381,400.0015,782,000.0038K.4111m3MEMBENTUK BAHU JALAN KERAS134,563.00147,670.00( MENGGUNAKAN ALAT )ASUMSI1.Menggunakan alat berat ( 2000 m bahu jalan / hari )2. 10 m timbunan padat dibutuhkan pada 1 m lebar bahu jalan3. Bahan timbunan yang dipilh dikirim leveransir sampai ditempat pekerjaan4. Leveransir meletakan material timbunan disepanjang bahu jalan5. Material disebar dengan grander6. 200 m3 timbunan padat perhariPekerja261,000.00282,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0811.00hariOperator terlatih40,000.0045,000.0040,000.0045,000.00L1014.00hariBuruh tak terlatih27,500.0030,000.00110,000.00120,000.00L1032.00hariBuruh semi terlatih33,000.0035,000.0066,000.0070,000.00Material25,001,600.0027,502,000.00K012250.00m3Kerikil sungai tidak tersaring100,000.00110,000.0025,000,000.0027,500,000.00M1700.20setAlat bantu8,000.0010,000.001,600.002,000.00Peralatan1,650,000.001,750,000.00E0105.00jamGrader 110 HP160,000.00170,000.00800,000.00850,000.00E08710.00jamMesin gilas bergetar 1 ton85,000.0090,000.00850,000.00900,000.00200m326,912,600.0029,534,000.0039K.4201m2MEMOTONG BAHU TINGGI42,037.5046,312.50( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga manusia ( 48 m2 / hari )2. Rata - rata bahu jalan dipotong setingggi 10 cm dengan tenaga ,manusia3. Semua sampah / kotoran dibuang sejauh 1 km , kapasitas 1.6 rit/pp/jam/truk4. Memuat dan membuang dengan tenaga manusia5. Hasil kerja rata - rata 1- 2 m2 / hari - orang6. Penggunakan alat bantu 1 bulan - orangPekerja1,325,000.001,467,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0914.00hariSopir45,000.0055,000.00180,000.00220,000.00L10140.00hariBuruh tak terlatih27,500.0030,000.001,100,000.001,200,000.00Material12,800.0016,000.00M1701.60setAlat bantu8,000.0010,000.0012,800.0016,000.00Peralatan680,000.00740,000.00E2214.00jamDump truk ( 3.5 T ) / 44 HP170,000.00185,000.00680,000.00740,000.0048m22,017,800.002,223,000.0040K.4211m2MEMOTONG BAHU JALAN TINGGI36,477.3339,760.0040( MENGGUNAKAN ALAT )ASUMSI1. Menggunakan alat berat ( K150 m3 / hari )2. Grader memotong bahu jalan setinggi 10 cm, selebar 1.5 m, sepanjang 1 km pada satu sisi jalan3. Jarak membuang 1 rit pp < 2 km4. 2,5 rit / jam / trukPekerja470,000.00537,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0812.00hariOperator terlatih40,000.0045,000.0080,000.0090,000.00L0914.00hariSopir45,000.0055,000.00180,000.00220,000.00L1016.00hariBuruh tak terlatih27,500.0030,000.00165,000.00180,000.00Material1,600.002,000.00M1700.20setAlat bantu8,000.0010,000.001,600.002,000.00Peralatan5,000,000.005,425,000.00E0105.00jamGrader 110 HP160,000.00170,000.00800,000.00850,000.00E0525.00jamWhell Loader 80 HP160,000.00175,000.00800,000.00875,000.00E21220.00jamDump truk ( 5 T ) - 68 HP170,000.00185,000.003,400,000.003,700,000.00150m25,471,600.005,964,000.0041K.4221m2MEMBERSIHKAN RUMPUT & TANAMAN DI BAHU JALAN493.67538.00DI BAHU JALAN ( BURUH )ASUMSI1. Menggunakan tenaga manusia ( 2 x 1 , 5 m x 500 m/hari )2. Dengan lebar 1 , 5 dari tepi jalan , rata - rata luas yang dibersihkan 3000 m2 / km satu sisi3. Hasil kerja : 60 m2 / hari - orang4. Sampah / reruntuhan dibuang sejauh 1 km415. Penggunaan alat bantu 1 bulan - orangPekerja732,500.00797,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L10125.00hariBuruh tak terlatih27,500.0030,000.00687,500.00750,000.00Material8,000.0010,000.00M1701.00setAlat bantu8,000.0010,000.008,000.0010,000.001,500m2740,500.00807,000.0042K.5101m3KONSTRUKSI LAPIS PONDASI BAWAH ( LPB ) KLAS A163,020.00175,413.33( MENGGUNAKAN ALAT )ASUMSI1. Menggunakan peralatan berat ( 150 m3 / hari.2. Dimulai dengan pekerjaan memperbaiki penurunan.3. Grader melakukan 2 kali lintasan untuk mencampurdan 3 kali lintasan untuk mencampur dan meratakan.4. Koefisien pemadatan = 1,2.5. Harga material berdasarkan harga di lokasi proyek.Pekerja280,000.00312,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0812.00hariOperator terlatih40,000.0045,000.0080,000.0090,000.00L0911.00ahriSopir45,000.0055,000.0045,000.0055,000.00L1014.00hariBuruh tak terlatih27,500.0030,000.00110,000.00120,000.00Material22,143,000.0023,785,000.00M02345.00m3Batu pecah 3-5 cm155,000.00160,000.006,975,000.007,200,000.0042M02423.00m3Batu pecah 2-3 cm150,000.00160,000.003,450,000.003,680,000.00M02513.00m3Batu pecah 1-2 cm160,000.00175,000.002,080,000.002,275,000.00M02627.00m3Batu pecah 0,5 - 1 cm170,000.00180,000.004,590,000.004,860,000.00M04072.00m3Pasir urug70,000.0080,000.005,040,000.005,760,000.00M1701.00setAlat bantu8,000.0010,000.008,000.0010,000.00Peralatan2,030,000.002,215,000.00E0105.00hariGrader 110 HP160,000.00170,000.00800,000.00850,000.00E0805.00hariMesin gilas 3 roda 8-10 T110,000.00125,000.00550,000.00625,000.00E1824.00hariTruk tangki air 68 HP170,000.00185,000.00680,000.00740,000.00150m324,453,000.0026,312,000.0043K.5111m3KONSTRUKSI LAPIS PONDASI BAWAH (LPB ) KLAS A200,350.00216,700.00( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan buruh ( 60 m3 / hari )2. Dimulai dengan pekerjaan memperbaiki penurunan3. Bahan dicampur dan diratakan = 12 cm4. Tebal lapis 10 cm5. Harga material berdasarkan harga di lokasi proyekPekerja1,945,000.002,127,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0811.00hariOperator terlatih40,000.0045,000.0040,000.0045,000.00L0911.00hariSopir45,000.0055,000.0045,000.0055,000.00L10166.00hariBuruh tak terlatih27,500.0030,000.001,815,000.001,980,000.00Material8,846,000.009,510,000.0043M02318.00m3Batu pecah 3-5 cm155,000.00160,000.002,790,000.002,880,000.00M0249.00m3Batu pecah 2-3 cm150,000.00160,000.001,350,000.001,440,000.00M0256.00m3Batu pecah 1-2 cm160,000.00175,000.00960,000.001,050,000.00M02610.00m3Batu pecah 0,5-1 cm170,000.00180,000.001,700,000.001,800,000.00M04029.00m3Pasir urug70,000.0080,000.002,030,000.002,320,000.00M1702.00setAlat bantu8,000.0010,000.0016,000.0020,000.00Peralatan1,230,000.001,365,000.00E0805.00jamMesin gilas 3 roda 8-10 T110,000.00125,000.00550,000.00625,000.00E0824.00jamTruk tangki air 68 HP170,000.00185,000.00680,000.00740,000.0060m312,021,000.0013,002,000.0044K.5121m3KONSTRUKSI LAPIS PONDASI BAWAH (LPB ) KLAS B140,544.00150,426.67( MENGGUNAKAN ALAT )ASUMSI1. Menggunakan alat berat2. Agregat ditimbun oleh leveransir di tmpt pekerjaan3. Menghampar & memadatkan lapisan tiap 15 cm4. Dipilih memakai 120 m3 batu pecah tersaring dh 75 m3 binder atau125 m3 batu pecah tersaring dg 65 m3 binder5. Tambahan binder (pasir urug u/ mengisi rongga-rongga)6. Produksi LPB padat 1000 m2/hariPekerja280,000.00312,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0812.00hariOperator terlatih40,000.0045,000.0080,000.0090,000.00L0911.00hariSopir45,000.0055,000.0045,000.0055,000.00L1014.00hariBuruh tak terlatih27,500.0030,000.00110,000.00120,000.0044Material18,301,600.0019,577,000.00M04065.00m3Pasir urug70,000.0080,000.004,550,000.005,200,000.00A110125.00m3Kerikil Pecah Tersaring110,000.00115,000.0013,750,000.0014,375,000.00M1700.20setAlat bantu8,000.0010,000.001,600.002,000.00Peralatan2,500,000.002,675,000.00E0105.00hariGrader 110 HP160,000.00170,000.00800,000.00850,000.00E1825.00jamTruk tangki air 68 HP170,000.00185,000.00850,000.00925,000.00E08710.00jamMesin gilas bergetar 1 ton85,000.0090,000.00850,000.00900,000.00150m321,081,600.0022,564,000.0045K.5131m3KONSTRUKSI LAPIS PONDASI BAWAH (LPB ) KLAS B208,743.33227,558.33( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan buruh ( 60 m3/ hari )2. Dimulai dengan pekerjaan memperbaiki penurunan.3. Bahan dicampur dan diratakan = 12 cm4. Harga material berdasarkan harga dilokasi proyek.5. Tebal lapisan 10 cmPekerja1,990,000.002,174,000.00L0612.00hariMandor45,000.0047,000.0090,000.0094,000.00L0811.00hariOperator terlatih40,000.0045,000.0040,000.0045,000.00L0911.00hariSopir45,000.0055,000.0045,000.0055,000.00L10166.00hariBuruh tak terlatih27,500.0030,000.001,815,000.001,980,000.00Material8,554,600.009,264,500.00M02310.00m3Batu pecah 3-5 cm155,000.00160,000.001,550,000.001,600,000.0045M02411.00m3Batu pecah 2-3 cm150,000.00160,000.001,650,000.001,760,000.00M0257.50m3Batu pecah 1-2 cm160,000.00175,000.001,200,000.001,312,500.00M02611.00m3Batu pecah 0,5-1 cm170,000.00180,000.001,870,000.001,980,000.00M04032.50m3Pasir urug70,000.0080,000.002,275,000.002,600,000.00M1701.20setAlat bantu8,000.0010,000.009,600.0012,000.00Peralatan1,980,000.002,215,000.00E0805.00jamMesin gilas 3 roda 8-10 T110,000.00125,000.00550,000.00625,000.00E1824.00jamTruk tangki air 68 HP170,000.00185,000.00680,000.00740,000.00E0845.00jamMesin gilas roda karet 8-15 T150,000.00170,000.00750,000.00850,000.0060m312,524,600.0013,653,500.0046K.5141m3KONSTRUKSI LAPIS PONDASI BAWAH (LPB ) KLAS C153,430.00168,325.00( MENGGUNAKAN ALAT )ASUMSI1. Menggunakan alat berat2. Kerikil ditimbun disepanjang jalan oleh leveransir3. Material kerikil kali tanpa disaring dikirim olehleveransir sampai tempat pekerjaan .4. 6 % kerikil dengan ukuran lebih ( oversize ) , yang tersingkir saat penghamparandengan Grader.5. Dihampar setebal 15 cm dipadatkan menjadi 10 cm padat6. Hasil kerja 1200 m2 perhari ( max 300 meter )Pekerja335,000.00372,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0812.00hariOperator terlatih40,000.0045,000.0080,000.0090,000.0046L0911.00hariSopir45,000.0055,000.0045,000.0055,000.00L1016.00hariBuruh tak terlatih27,500.0030,000.00165,000.00180,000.00Material16,001,600.0017,602,000.00K012160.00m3Kerikil sungai tidak tersaring100,000.00110,000.0016,000,000.0017,600,000.00M1700.20setAlat bantu8,000.0010,000.001,600.002,000.00Peralatan2,075,000.002,225,000.00E0105.00jamGrader 110 HP160,000.00170,000.00800,000.00850,000.00E0825.00jamMesin gilas bergetar 1 ton85,000.0090,000.00425,000.00450,000.00E1825.00jamTruk tangki air 68 HP170,000.00185,000.00850,000.00925,000.00120m318,411,600.0020,199,000.0047K.5151m3KONSTRUKSI LAPIS PONDASI BAWAH ( LPB ) KLAS C179,833.33197,766.67( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga manusia setempat2. Kerikil ditimbun sepanjang jalan oleh leveransir3. Kerikil dengan ukuran lebih ( oversize ) yang tersingkir saat penghamparandengan orang dihiting 6 %4. Dihampar dalam 2 lapis dan dipadatkan , tebal padat 10 cm padat.5. Penggunaan alat bantu = 1 bulan - orang6. Hasil kerja menghampar dan memadatkan 600 m2/hari ( 4 m x 150 m )7. Kerikil kali tanpa disaring dikirim leveransir sampai ketempat pekerjaan47Pekerja1,870,000.002,041,000.00L0613.00hariMandor45,000.0047,000.00135,000.00141,000.00L0811.00hariOperator terlatih40,000.0045,000.0040,000.0045,000.00L0911.00hariSopir45,000.0055,000.0045,000.0055,000.00L10160.00hariBuruh tak terlatih27,500.0030,000.001,650,000.001,800,000.00Material7,520,000.008,275,000.00M1702.50setAlat bantu8,000.0010,000.0020,000.0025,000.00M01375.00m3Kerikil sungai tanpa disaring100,000.00110,000.007,500,000.008,250,000.00Peralatan1,400,000.001,550,000.00E0805.00jamMesin gilas 3 roda 8-10 T110,000.00125,000.00550,000.00625,000.00E1825.00jamTruk tangki air 68 HP170,000.00185,000.00850,000.00925,000.0060m310,790,000.0011,866,000.0048K.5161m2KONSTRUKSI LAPIS PONDASI BAWAH ( LPB ) TELFORD174,743.75194,637.50( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga manusia 400 m2 per hari2. Material-material dikirim ketempat pekerjaan oleh leveransir3. Batu sudah dipecah4. Tanah dasar sudah disiapkan5. Dipadatkan sampai tebal 20 cmPekerja2,897,500.003,156,000.00L0613.00hariMandor45,000.0047,000.00135,000.00141,000.00L0811.00hariOperator terlatih40,000.0045,000.0040,000.0045,000.0048L10199.00hariBuruh tak terlatih27,500.0030,000.002,722,500.002,970,000.00Material10,532,000.0011,790,000.00M02050.00m3Batu belah 15/20110,000.00125,000.005,500,000.006,250,000.00M02220.00m3Batu pecah 5-7 cm145,000.00155,000.002,900,000.003,100,000.00M04030.00m3Pasir urug70,000.0080,000.002,100,000.002,400,000.00M1704.00setAlat bantu8,000.0010,000.0032,000.0040,000.00Peralatan550,000.00625,000.00E0805.00jamMesin gilas 3 roda 8-10 T110,000.00125,000.00550,000.00625,000.0080m213,979,500.0015,571,000.0049K.5201m3KONSTRUKSI LAPIS PONDASI ATAS ( LPB ) KLAS A165,888.33174,908.33( MENGGUNAKAN ALAT )ASUMSI1. Menggunakan peralatan berat2. Material dikirim dan timbun oleh levaransir3. Penghamparan dan pemadatan sampai tabal 10 cm4. Menggunakan : 133 m3 batu pecah mesin dengan blder 34 m3 atau 140 m3kerikil pecah dengan blder 13 m5. Tambahan blder untuk mengisi rongga6. Dicampur dan dipadatkan 1200 m2 per hariPekerja280,000.00312,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0812.00hariOperator terlatih40,000.0045,000.0080,000.0090,000.00L0911.00hariSopir45,000.0055,000.0045,000.0055,000.00L1014.00hariBuruh tak terlatih27,500.0030,000.00110,000.00120,000.0049Material17,551,600.0018,452,000.00M04015.00m3Pasir urug70,000.0080,000.001,050,000.001,200,000.00M1700.20setAlat bantu8,000.0010,000.001,600.002,000.00M110150.00m3Kerikil pecah tersaring110,000.00115,000.0016,500,000.0017,250,000.00Peralatan2,075,000.002,225,000.00E0105.00jamGrader 110 HP160,000.00170,000.00800,000.00850,000.00E0825.00jamMesin gilas bergetar 1 ton85,000.0090,000.00425,000.00450,000.00E1825.00jamTruk tangki air 68 Hp170,000.00185,000.00850,000.00925,000.00120m319,906,600.0020,989,000.0050K.5211m3KONSTRUKSI LAPIS PONDASI ATAS ( LPB ) KLAS A203,116.67216,275.00( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga manusia2. Pengadaan barang oleh leveransir3. Buruh menghampar batu pecah diatas LPB ( 15 cm )4. Menggunakan 135 m3 batu pecah mesin dengan blnder ( pasir urug )34 m3 atau 140 m3 kerikil pecah mesin dengan blnder ( pasir urug ) 15 m35. Rongga-rongga ditutup dengan pasir urug dengan tenaga orang6. Dipadatkan sampai 10 cm padat7. Hasil kerja menghampar dan memadatkan 600 m2 / hari50Pekerja3,980,000.004,348,000.00L0614.00hariMandor45,000.0047,000.00180,000.00188,000.00L0812.00hariOperator terlatih40,000.0045,000.0080,000.0090,000.00L0912.00hariSopir45,000.0055,000.0090,000.00110,000.00L101132.00hariBuruh tak terlatih27,500.0030,000.003,630,000.003,960,000.00Material17,594,000.0018,505,000.00M04015.00m3Pasir urug70,000.0080,000.001,050,000.001,200,000.00M1705.50setAlat bantu8,000.0010,000.0044,000.0055,000.00A110150.00m3Kerikil pecah tersaring110,000.00115,000.0016,500,000.0017,250,000.00Peralatan2,800,000.003,100,000.00E08010.00jamMesin gilas 3 roda 8 - 10 T110,000.00125,000.001,100,000.001,250,000.00E18210.00jamTruk tangki air 68 HP170,000.00185,000.001,700,000.001,850,000.00120m324,374,000.0025,953,000.0051K.5221m3KONSTRUKSI LAPIS PONDASI ATAS ( LPB ) KLAS B162,460.00170,353.33( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan alat berat2. Kerikil ditimbun dan diletakkan disepanjang jalan oleh leveransir3. Dihampar dan dipadatkan hingga dipadat tebal padat 10 cm4. Hasil kerja menghampar dan memadatkan 1500 m2/ari ( 4m x 175 m )51Pekerja280,000.00312,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0812.00hariOperator terlatih40,000.0045,000.0080,000.0090,000.00L0911.00hariSopir45,000.0055,000.0045,000.0055,000.00L1014.00hariBuruh tak terlatih27,500.0030,000.00110,000.00120,000.00Material22,014,000.0023,016,000.00M1700.20m3Pasir urug70,000.0080,000.0014,000.0016,000.00K016200.00m3Agregat disaring110,000.00115,000.0022,000,000.0023,000,000.00Peralatan2,075,000.002,225,000.00E0105.00jamGrader 110 HP160,000.00170,000.00800,000.00850,000.00E0825.00jamMesin gilas bergetar 1 ton85,000.0090,000.00425,000.00450,000.00E1825.00jamTruk tangki air 68 HP170,000.00185,000.00850,000.00925,000.00150m324,369,000.0025,553,000.0052K.5231m3KONSTRUKSI LAPIS PONDASI ATAS ( LPB ) KLAS B186,213.33196,853.33( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga manusia2. Kerikil ditimbun dan diletakkan disepanjang jalan oleh leveransir3. Buruh menghampar kerikil pecah diatas LPB dalam dua lapis4. Dipadatkan hingga didapat tebal padat 10 cm5. Hasil kerja menghampar memadatkan 750 m2 / hariPekerja3,100,000.003,388,000.00L0614.00hariMandor45,000.0047,000.00180,000.00188,000.00L0812.00hariOperator terlatih40,000.0045,000.0080,000.0090,000.0051L0912.00hariSopir45,000.0055,000.0090,000.00110,000.00L101100.00hariBuruh tak terlatih27,500.0030,000.002,750,000.003,000,000.00Material22,032,000.0023,040,000.00M1704.00setAlat bantu8,000.0010,000.0032,000.0040,000.00K016200.00m3Agregat disaring110,000.00115,000.0022,000,000.0023,000,000.00Peralatan2,800,000.003,100,000.00E08010.00jamMesin gilas 3 roda 8 - 10 T110,000.00125,000.001,100,000.001,250,000.00E18210.00jamTruk tangki air 68 HP170,000.00185,000.001,700,000.001,850,000.00150m327,932,000.0029,528,000.0053K.5281m3MENGHAMPAR LAPIS PONDASI ATAS ASPAL BETON661,261.81694,508.33( LASTON ATAS ) ( MENGGUNAKAN ALAT )ASUMSI1. Menggunakan alat berat2. ATB dihampar dan dipadatkan ketebalan 10 cm3. Spesifikasi BM no. 03 / PT / 8 / 1983Pekerja855,000.00947,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0814.00hariOperator terlatih40,000.0045,000.00160,000.00180,000.00L10112.00hariBuruh tak terlatih27,500.0030,000.00330,000.00360,000.00L1068.00hariBuruh terlatih40,000.0045,000.00320,000.00360,000.0052Material26,081,781.2527,205,875.00M0410.60m3Pasir beton170,000.00190,000.00102,000.00114,000.00M061135.00kgAspal7,968.758,125.001,075,781.251,096,875.00M06590.00LtMinyak bakar10,000.0011,000.00900,000.00990,000.00M1700.50setAlat bantu8,000.0010,000.004,000.005,000.00K526100.00tonCampuran Laston atas240,000.00250,000.0024,000,000.0025,000,000.00Peralatan2,820,000.003,100,000.00E0805.00jamMesin gilas 3 roda 8 - 10 T110,000.00125,000.00550,000.00625,000.00E0845.00jamMesin gilas roda karet 8 - 15 T150,000.00170,000.00750,000.00850,000.00E1533.00jamMesin penyemprot aspal 1000 L70,000.0075,000.00210,000.00225,000.00E1575.00jamMesin penghampar 1,28 m190,000.00200,000.00950,000.001,000,000.00E3014.00jamCompressor 210 m3 / jam90,000.00100,000.00360,000.00400,000.0045m329,756,781.2531,252,875.0054K.6101.00M3JAPAT / AWCAS221,830.00236,790.0010010( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga manusia 4 m x 180 / hari2. Tanah dasar selebar 6 m sudah disiapkan3. Agregat tidak disaring dikirim oleh leveransir4. 20 % agregat yang melebihi ukuran ( oversizer ) disingkirkan dengan tenaga menusia5. Agregat dihampar dengan tenaga manusia , dipadat dengan mesin gilas disiram air, sampai tebal 10 cmPekerja6,555,000.007,219,000.00L0617.00hariMandor45,000.0047,000.00315,000.00329,000.0052L0811.00hariOperator terlatih45,000.0055,000.0045,000.0055,000.00L09113.00hariSopir45,000.0055,000.00585,000.00715,000.00L101204.00hariBuruh tak terlatih27,500.0030,000.005,610,000.006,120,000.00Material13,268,000.0013,885,000.00M1708.50setAlat bantu8,000.0010,000.0068,000.0085,000.00MR42120.00m3Ganti rugi kerikil sungai - royalti110,000.00115,000.0013,200,000.0013,800,000.00Peralatan2,360,000.002,575,000.00M0801.00hariMesin gilas 3 roda 8 - 10 T150,000.00170,000.00150,000.00170,000.00M1821.00hariTruk tangki air 68 HP170,000.00185,000.00170,000.00185,000.00M22112.00hariDunp truk ( 3,5 T 0) 44 HP170,000.00185,000.002,040,000.002,220,000.00100.00M322,183,000.0023,679,000.0055K.6111.00M3JAPAT / AWCAS151,377.33158,526.6710.00( MENGGUNAKAN ALAT )ASUMSI1. Menggunakan alat berat ( 4m x 375m / hari )2. Tanah dasar setebal 8 m sudah disiapkan ( K410)3. Agregat pecah dikirim ketempat pekerjaan oleh leveransir4, Grader menghampar dalam 3 Lintasan hasil kerja 4m x 6km / 5 jam - hari5. Agregat dipadatkan dengan mesin roda karet dan disiram air sampai tebal padat 10 cm6. Dipakai agregat disaring ( K 041 atau K 916 )Pekerja290,000.00332,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0812.00hariOperator terlatih45,000.0055,000.0090,000.00110,000.00L0911.00hariSopir45,000.0055,000.0045,000.0055,000.00L1014.00hariBuruh tak terlatih27,500.0030,000.00110,000.00120,000.00Material22,001,600.0023,002,000.0054K016200.00m3Agregat disaring110,000.00115,000.0022,000,000.0023,000,000.00M1700.20setAlat bantu8,000.0010,000.001,600.002,000.00Peralatan415,000.00445,000.00E0101.00hariGrader 110 HP160,000.00170,000.00160,000.00170,000.00E0821.00hariMesin gilas bergetar 1 ton85,000.0090,000.0085,000.0090,000.00E1821.00hariTruk tangki air 68 HP170,000.00185,000.00170,000.00185,000.00150.00M322,706,600.0023,779,000.0056K.6121m2LABURAN ASPAL PASIR ( BURAS )15,358.0716,174.79( MENGGUNAKAN ALAT )ASUMSI1. Kemampuan kerja 2400 ( 4 x 600 ) m2 / hari2. Pasir dikirim oleh leveransir sampai ditempat kerja3. Kebutuhan aspal sampai 1,2 lt/m2 sampai residu 0,96 l / m34. Pasir disebar rata - rata 55 m2 / m35. Pemansan aspal dengan ketel dilakukan dilokasi pekerjaan6. Pasir dimuat ulang kedalam truk dengan tenaga manusia dan dihampar dengan mesin penghampar7. Spesifikasi BM. 05 / PT / 8 / 1983Pekerja636,000.00707,000.00E0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0812.00hariOperator terlatih40,000.0045,000.0080,000.0090,000.00E0912.00hariSopir45,000.0055,000.0090,000.00110,000.00E10110.00hariBuruh tak terllatih27,500.0030,000.00275,000.00300,000.00L1032.00hariBuruh semi terlatih33,000.0035,000.0066,000.0070,000.00L1062.00hariBuruh terlatih40,000.0045,000.0080,000.0090,000.00Material33,423,375.0035,037,500.00M04143.00m3Pasir beton170,000.00190,000.007,310,000.008,170,000.00M0612,900.00KgAspal7,968.758,125.0023,109,375.0023,562,500.00M063300.00LtMinyak bakar10,000.0011,000.003,000,000.003,300,000.00M1700.50setAlat bantu8,000.0010,000.004,000.005,000.00Peralatan2,800,000.003,075,000.00E0845.00jamMesin gilas roda karet 8 - 15 T150,000.00170,000.00750,000.00850,000.0055E1535.00jamMesin penyemprot aspal 1000 L70,000.0075,000.00350,000.00375,000.00E21110.00jamDump truk 3,5 t / 44 HP170,000.00185,000.001,700,000.001,850,000.002,400m236,859,375.0038,819,500.0057K.6131.00m2JAPAT PEMBENTUKAN DAN PENGERIKILAN152,912.00161,672.00250( MENGGUNAKAN ALAT )ASUMSI1. Mengggunakan alat berat ( 3 x 1,5 km/hari 4500 m2 )2. Dimulai dengan pekerjaan pebaikan penurunan dan penutup lubang pada muka jalan3. Grader lakukan 2 lintasan dan 3 lintasan menghampar , untuk jalanuntuk jalan 2 m, panjang 1,5 km diselesaikan sehari4. Agregat dikirim ketempat pekerjaan oleh leveransir5. Tebal pemadatan agregat tersaring rata - rata 4 cm6. Penggunaan alat bantu 1 bulan / orang7. Dipakai agregat tersaring ( K014 atau K016 )250.00M338,228,000.0040,418,000.00Pekerja3,040,000.003,333,000.00L0615.00hariSopir45,000.0055,000.00225,000.00275,000.00L08119.00hariMandor45,000.0047,000.00855,000.00893,000.00L09117.00hariOperator terlatih40,000.0045,000.00680,000.00765,000.00L10120.00hariPekerja tak terlatih27,500.0030,000.00550,000.00600,000.00L0824.00hariOperator semi terlatih36,500.0040,000.00146,000.00160,000.00L10316.00hariPekerja semi terlatih36,500.0040,000.00584,000.00640,000.00Material34,708,000.0036,560,000.0053M1701.00SetAlat Bantu8,000.0010,000.008,000.0010,000.00M212270.00m3Kerikil sungai - dipungut Royalty110,000.00115,000.0029,700,000.0031,050,000.00M24250.00m3Sirtu100,000.00110,000.005,000,000.005,500,000.00Peralatan480,000.00525,000.00E0101.00hariGrader 110 HP160,000.00170,000.00160,000.00170,000.00E0841.00hariMesin gilas roda karet150,000.00170,000.00150,000.00170,000.00E1821.00hariTruk tangki air 68 HP170,000.00185,000.00170,000.00185,000.0058K.6141.00m2JABAT PEMBENTUKAN PENGERIKILAN ULANG 4 CM210,945.00231,040.00( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga manusia 3m x 750 m/ hari ( 2500 m3 )2. Dimulai dengan pekerjaan perbaikan penurunan dan menutup pada muka jalan3. Agregat dikirim ketempat pekerjaan oleh leveransir4. 30 % Agregat melebihan ukuran , dipecahkan di hampar lagi dengan tenaga orang5. Agregat dihampar dengan tenaga manusia , dipadatkan dengan gilasan disiram air , tebal padat 4 cm100.00m221,094,500.0023,104,000.00Pekerja6,962,500.007,659,000.00L0617.00hariMandor45,000.0047,000.00315,000.00329,000.00L0811.00hariOperator terlatih40,000.0045,000.0040,000.0045,000.00L09113.00hariSopir45,000.0055,000.00585,000.00715,000.00L101219.00hariPekerja tak terlatih27,500.0030,000.006,022,500.006,570,000.00Material12,072,000.0013,290,000.00M1709.00setAlat bantu8,000.0010,000.0072,000.0090,000.00M242120.00m3Sirtu100,000.00110,000.0012,000,000.0013,200,000.00Peralatan2,060,000.002,155,000.00E0801.00hariMesin gilas 3 roda 8 - 10 ton150,000.00170,000.00150,000.00170,000.00E1821.00hariTruk tangki air 68 HP170,000.00185,000.00170,000.00185,000.00E22112.00hariTruk bak terbuka 3t - 44 HP145,000.00150,000.001,740,000.001,800,000.0059K.6151m2LABURAN ASPAL - SATU LAPIS ( BURTU ) ATAU ( BURDA 1 )31,884.9832,802.29( MENGGUNAKAN BURUH )ASUMSI1. Hasil kerja 600 m2/hari2. Agregat halus hasil saringan 20 cm dari mesin pemecahan batu ditimbun ditempat pekerjaan oleh lveransir3. Permukaan yang dilabur telah selesai digilas dan terikat dengan blender4. Laburan permukaan menggunakan aspal " MC " 1.0 litre/m25. Menggunakan minyak residu = 1.6 Liter / m26. Agregat halus 1 . 2 cm disebar dari dump truk tiap 50 m2/m3Pekerja2,028,000.002,256,000.00L0613.00hariMandor45,000.0047,000.00135,000.00141,000.00L0819.00hariOperator terlatih40,000.0045,000.00360,000.00405,000.00L0916.00hariSopir45,000.0055,000.00270,000.00330,000.00L10130.00hariBuruh tak terlatih27,500.0030,000.00825,000.00900,000.00L1036.00hariBuruh semi terlatih33,000.0035,000.00198,000.00210,000.00L1066.00hariBuruh terlatih40,000.0045,000.00240,000.00270,000.00Material39,614,968.7540,963,125.00M0613,745.00KgAspal7,968.758,125.0029,842,968.7530,428,125.00M065580.00LtMinyak bakar10,000.0011,000.005,800,000.006,380,000.00M1701.50setAlat bantu8,000.0010,000.0012,000.0015,000.00A11036.00m3Kerikil pecah tersaring110,000.00115,000.003,960,000.004,140,000.00Peralatan15,750,000.0015,825,004.00E40115.00jamPeralatan traktor dll130,000.00185,000.001,950,000.004.00E08415.00jamMesin gilas roda karet 8 - 15 T150,000.00170,000.002,250,000.002,550,000.00E15315.00jamMesin penyemprot aspal 1000 L70,000.0075,000.001,050,000.001,125,000.00E21130.00jamDump truk 3.5 t / 44 HP170,000.00185,000.005,100,000.005,550,000.00E05315.00jamWhell tractor 60 HP160,000.00200,000.002,400,000.003,000,000.00E13030.00jamChipspreader100,000.00120,000.003,000,000.003,600,000.001,800m257,392,968.7559,044,129.0060K.6161m2PELAPISAN ULANG ATAU LABURAN ASPAL LAPIS KEDUA14,753.8215,577.50( BURDA 2 ) ( MENGGUNAKAN ALAT )ASUMSI1. Hasil kerja 1800 m2 / hari2. Agregat halus hasil saringan 10 cm mesin pemecah batu3. Campuran flux bitumen disemprotkan tiap 1,3 litre / m24. Agregat halus disaring 10 cm dihampar tiap 100 m2 / m35. Agregat dimuat ke truk dengan tenaga manusia dan dihampar dengan mesin penghampar agregatPekerja676,000.00752,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0813.00hariOperator terlatih40,000.0045,000.00120,000.00135,000.00L0912.00hariSopir45,000.0055,000.0090,000.00110,000.00L10110.00hariBuruh tak terlatih27,500.0030,000.00275,000.00300,000.00L1032.00hariBuruh semi terlatih33,000.0035,000.0066,000.0070,000.00L1062.00hariBuruh terlatih40,000.0045,000.0080,000.0090,000.00Material20,630,875.0021,087,500.00M0612,340.00KgAspal7,968.758,125.0018,646,875.0019,012,500.00M1700.50setAlat bantu8,000.0010,000.004,000.005,000.00A11018.00m3Kerikil pecah tersaring110,000.00115,000.001,980,000.002,070,000.00Peralatan5,250,000.006,200,000.00E4015.00jamPeralatan tractor dll130,000.00185,000.00650,000.00925,000.00E0845.00jamMesin gilas roda karet 8 - 15 T150,000.00170,000.00750,000.00850,000.00E1535.00jamMesin penyemprot aspal 1000 L70,000.0075,000.00350,000.00375,000.00E21110.00jamDump truk 3,5 t / 44 HP170,000.00185,000.001,700,000.001,850,000.00E0535.00jamWhell Tractor 60 HP160,000.00200,000.00800,000.001,000,000.00E13010.00jamChipspreader100,000.00120,000.001,000,000.001,200,000.001,800m226,556,875.0028,039,500.0061K.6171m2LABURAN ASPAL DUA LAPIS ( BURDA )46,196.5849,435.35( MENGGUNAKAN ALAT )ASUMSI1. Menggunakan peralatan berat , kapasitas 450 m2 / hari2. Agregat ukuran T- 2 cm dan pemecah batu ditimbun dilokasi pekerjaan oleh leveransir3. Permukaan yang diaspal harus sudah dipadatkan diadakan binding disiram primer aspal cair 1 L /m24. Bitumen residu yang dipakai : lapis 1, sebanyak 1 , 4 L / m2lapis 2, sebanyak 1,5 L / m25. Chip dari dump tryk masuk sprender dengan rata - rata 50 m2 / m3Pekerja2,704,000.003,008,000.00L0614.00hariMandor45,000.0047,000.00180,000.00188,000.00L08112.00hariOperator terlatih40,000.0045,000.00480,000.00540,000.00L0918.00hariSopir45,000.0055,000.00360,000.00440,000.00L10140.00hariBuruh tak teralatih27,500.0030,000.001,100,000.001,200,000.00L1038.00hariBuruh semi terlatih33,000.0035,000.00264,000.00280,000.00L1068.00hariBuruh terlatih40,000.0045,000.00320,000.00360,000.00Material59,449,843.7561,175,625.00M0616,085.00KgAspal7,968.758,125.0048,489,843.7549,440,625.00M065500.00LtMinyak bakar10,000.0011,000.005,000,000.005,500,000.00M1702.50setAlat bantu8,000.0010,000.0020,000.0025,000.00A11054.00m3Kerikil pecah tersaring110,000.00115,000.005,940,000.006,210,000.00Peralatan21,000,000.0024,800,000.00E05320.00jamWhell tractor 60 HP160,000.00200,000.003,200,000.004,000,000.00E40120.00jamPeralatan tractor dll130,000.00185,000.002,600,000.003,700,000.00E05420.00jamMesin gilas roda karet 8 - 15 T150,000.00170,000.003,000,000.003,400,000.00E15320.00jamMesin penyemprot aspal 1000 L70,000.0075,000.001,400,000.001,500,000.00E21 140.00jamDump truk170,000.00185,000.006,800,000.007,400,000.00E13040.00jamChipspreader100,000.00120,000.004,000,000.004,800,000.001,800m283,153,843.7588,983,625.0062K.6181m2LAPIS PENETRASI MAKADAN 5 CM ( LAPEN )58,888.4761,335.18( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga buruh2. Harga material ( agregat pokok , agregat pengunci, agregat penutup, aspal ) adalah dilokasi proyek3. Volume aspal cair tock coat 0,8 Lt / m24. Tabel lapisan penetrasi = 5 cm5. Agregat dikirim sampai tempat pekerjaan oleh leveransirPekerja6,330,000.006,927,000.00L0616.00hariMandor45,000.0047,000.00270,000.00282,000.00L0816.00hariOperator terlatih40,000.0045,000.00240,000.00270,000.00L0913.00hariSopir45,000.0055,000.00135,000.00165,000.00L101198.00hariBuruh tak terlatih27,500.0030,000.005,445,000.005,940,000.00L1066.00hariBuruh terlatih40,000.0045,000.00240,000.00270,000.00Material70,863,862.5073,167,250.00M02356.00m3Batu pecah 3 - 5 cm155,000.00160,000.008,680,000.008,960,000.00M02431.00m3Batu pecah 2 - 3 cm150,000.00160,000.004,650,000.004,960,000.00M02515.50m3Batu pecah 1 - 2 cm160,000.00175,000.002,480,000.002,712,500.00M0413.50m3Pasir beton150,000.00160,000.00525,000.00560,000.00M0616,270.00KgAspal7,968.758,125.0049,964,062.5050,943,750.00M065450.00LtMinyak bakar10,000.0011,000.004,500,000.004,950,000.00M1708.10setAlat bantu8,000.0010,000.0064,800.0081,000.00Peralatan5,250,000.005,775,000.00E08015.00jamMesin gilas tiga roda 8 - 10 T110,000.00125,000.001,650,000.001,875,000.00E18215.00jamSprayer aspal 2 : 0 L70,000.0075,000.001,050,000.001,125,000.00E22115.00jamDump truk ( 3,5 T ) / 44 HP170,000.00185,000.002,550,000.002,775,000.001,400m282,443,862.5085,869,250.0063K.6211m2PENGHAMPARAN DAN PEMADATAN LATASIR 2 CM81,467.3894,764.19( MEMAKAI ALAT )ASUMSI1. Menggunakan peralatan berat 1750 m2 / hari2. Pasir aspal dikiraim oleh leveransir ke tempat pekerjaan3. BJ asbuton padat 1, 9 ton / m34. Rata - rata tebal lapisan padat 3 cmPekerja2,652,000.002,877,000.00L0616.00hariMandor45,000.0047,000.00270,000.00282,000.00L08115.00hariOperator terlatih40,000.0045,000.00600,000.00675,000.00L10136.00hariBuruh tak terlatih27,500.0030,000.00990,000.001,080,000.00L10324.00hariBuruh semi terlatih33,000.0035,000.00792,000.00840,000.00Material412,526,750.00479,935,000.00M0611,320.00KgAspal7,968.758,125.0010,518,750.0010,725,000.00M065200.00LtMinyak bakar10,000.0011,000.002,000,000.002,200,000.00M1701.00setAlat bantu8,000.0010,000.008,000.0010,000.00K620200.00tonCampuran Latasir2,000,000.002,335,000.00400,000,000.00467,000,000.00Peralatan12,525,000.0014,700,000.00E40115.00jamPeralatan tractor dll130,000.00185,000.001,950,000.002,775,000.00E08115.00jamMesin gilas tandem 6 - 10 ton135,000.00150,000.002,025,000.002,250,000.00E08415.00jamMesin gilas roda karet 8 - 15 T150,000.00170,000.002,250,000.002,550,000.00E15315.00jamMesin penyemprot aspal 1000 L70,000.0075,000.001,050,000.001,125,000.00E15715.00jamMesin penghampar 1,82 m190,000.00200,000.002,850,000.003,000,000.00E05315.00jamWhell Tractor 60 HP160,000.00200,000.002,400,000.003,000,000.005,250m2427,703,750.00497,512,000.0064K.6261m2MENGHAMPAR LAPIS TIPIS ASPAL BUTON MURNI16,314.0617,441.75( LATASBUN ) ( MENGGUNAKAN ALAT )ASUMSI1. Campuran Latasbun sudah disiapkan di lokasi pekerjaan ( K . 625 )2. Berat volume padat Latsabun 1,5 t / m33. Tebal lapisan padat = 3, BJ = 2 ton / m34. Kapasitas kerja penghamparan = 1500 m2, dengan alat semi intensif5. Aspal panas disiapkan didalam spreyer aspal dengan primer sebesar 1 L / m2Pekerja1,035,000.001,142,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0811.00hariOperator terlatih40,000.0045,000.0040,000.0045,000.00L10610.00hariBuruh terlatih40,000.0045,000.00400,000.00450,000.00L10120.00hariBuruh tak terlatih27,500.0030,000.00550,000.00600,000.00Material63,186,250.0067,475,000.00K62560.00tonCampuran latasbun320,000.00350,000.0019,200,000.0021,000,000.00M0613,000.00KgAspal7,968.758,125.0023,906,250.0024,375,000.00M0642,000.00LtMinyak aspal ( pengencer )10,000.0011,000.0020,000,000.0022,000,000.00M17010.00setAlat bantu8,000.0010,000.0080,000.00100,000.00Peralatan1,035,000.001,150,000.00E0815.00jamMesin gilas tandem 6 - 10 ton135,000.00150,000.00675,000.00750,000.00E3014.00jamCompresor 210 m3 / jam90,000.00100,000.00360,000.00400,000.004,000m265,256,250.0069,767,000.0065K.6311m2MENGHAMPAR LAPIS ASPAL BUTON AGREGAT TEBAL 3 CM131,359.03162,243.33( LASBUTAG ) ( MENGGUNAKAN BURUH )ASUMSI1. Mengguankan tenaga manusia 750 m2 / hari2. Aspal campuran dingin dikirim ke tempat pekerjaan oleh leveransir3. Pemakaian campuran dingin 16,7 m2 / ton dalam tebal padat 3 cm4. Pemakaian aspal untuk tock coat 0,5 L / m3 dengan tenaga manusiaPekerja683,500.00747,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0812.00hariOperator terlatih40,000.0045,000.0080,000.0090,000.00L09115.00hariBuruh tak terlatih27,500.0030,000.00412,500.00450,000.00L1032.00hariBuruh semi terlatih33,000.0035,000.0066,000.0070,000.00L1062.00hariBuruh terlatih40,000.0045,000.0080,000.0090,000.00Material96,115,775.00119,010,500.00K63045.00tonCampuran Lasbutag2,000,000.002,500,000.0090,000,000.00112,500,000.00M061340.00KgAspal7,968.758,125.002,709,375.002,762,500.00M065340.00LtMinyak Bakar10,000.0011,000.003,400,000.003,740,000.00M1700.80setAlat bantu8,000.0010,000.006,400.008,000.00Peralatan1,720,000.001,925,000.00E0805.00jamMesin gilas 3 roda 8 - 10 T110,000.00125,000.00550,000.00625,000.00E0845.00jamMesin gilas roda karet 8 - 15 T150,000.00170,000.00750,000.00850,000.00E1546.00jamSprayer aspal 200 L70,000.0075,000.00420,000.00450,000.00750m298,519,275.00121,682,500.0066K.6321m2MENGHAMPAR LAPIS ASPAL BUTON & PASIR TEBAL 3 CM24,133.5426,409.58( LASBUTAG ) ( MENGGUNAKAN ALAT )ASUMSI1. Menggunakan alat berat ( 1500 m2 / hari )2. Lasbutag dikirim ketempat pekerjaan oleh leveransir3. BJ Lasbutag padat 2.0 ton / m34. Rata - rata tebal lapisan padat 3 cm5. Aspal primer dioleskan dengan tara 1,0 L / m2Pekerja855,000.00947,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0814.00hariOperator terlatih40,000.0045,000.00160,000.00180,000.00L10112.00hariBuruh tak teralatih27,500.0030,000.00330,000.00360,000.00L1068.00hariBuruh terlatih40,000.0045,000.00320,000.00360,000.00Material32,385,306.2535,417,375.00A20390.00tonCampuran dingin ( PASIR & LASBUTAG )225,000.00250,000.0020,250,000.0022,500,000.00M061675.00KgAspal7,968.758,125.005,378,906.255,484,375.00M065675.00LtMinyak bakar10,000.0011,000.006,750,000.007,425,000.00M1700.80setAlat bantu8,000.0010,000.006,400.008,000.00Peralatan2,960,000.003,250,000.00E0805.00jamMesin gilas 3 roda 8 - 10 T110,000.00125,000.00550,000.00625,000.00E0845.00jamMesin gilas roda karet 8 - 15 T150,000.00170,000.00750,000.00850,000.00E1535.00jamMesin penyemprot 1000 L70,000.0075,000.00350,000.00375,000.00E1575.00jamMesin penghampar 1,82 m190,000.00200,000.00950,000.001,000,000.00E3014.00jamCompresor 210 m3 / Jam90,000.00100,000.00360,000.00400,000.001,500m236,200,306.2539,614,375.0067K.6361m2PENGHAMPARAN DAN PEMADATAN LATASTON7,019.967,522.17( LATASTON ) ( MENGGUNAKAN ALAT )ASUMSI1. Menggunakan alat berat 1500 m2 / hari2. Asbuton campuran panas dikirim oleh leveransir ke tempat pekerjaan3. BJ asbuton padat 2 . 2 ton /m34. Spec - BM No. 12/DT/8/19855. Rata - rata tebal lapisan 3 cmPekerja855,000.00947,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0814.00hariOperator terlatih40,000.0045,000.00160,000.00180,000.00L10112.00hariBuruh tak terlatih27,500.0030,000.00330,000.00360,000.00L1068.00hariBuruh terlatih40,000.0045,000.00320,000.00360,000.00Material6,589,937.506,961,250.00M061450.00KgAspal7,968.758,125.003,585,937.503,656,250.00M063300.00LtMinyak bakar10,000.0011,000.003,000,000.003,300,000.00M1700.50setAlat bantu8,000.0010,000.004,000.005,000.00K635100.00tonCampuran Lataston250,000.00300,000.0025,000,000.0030,000,000.00Peralatan3,085,000.003,375,000.00E0815.00jamMesin gilas tandem 6 - 10 ton135,000.00150,000.00675,000.00750,000.00E0845.00jamMesin gilas roda karet 8 - 15 T150,000.00170,000.00750,000.00850,000.00E1535.00jamMesin penyemprot aspal 1000 L70,000.0075,000.00350,000.00375,000.00E1575.00jamMesin penghampar 1, 82 m190,000.00200,000.00950,000.001,000,000.00E3014.00jamCompresor 210 m3 / jam90,000.00100,000.00360,000.00400,000.001,500m210,529,937.5011,283,250.0068K.6371m3PELAPISAN ULANG ATAU PENETRASI MACADAM 7 CM, LPA1,021,558.931,060,235.71( MENGGUNAKAN BURUH )ASUMSI1. Menggunakan tenaga manusia2. Batu pecah dikirim ke tempat pekerjaan oleh leveransir3. Tebal perkerasan total 7 cm4. Hasil kerja 2000 m2 / minggu ( 6 hari )Pekerja6,330,000.006,837,000.00L0616.00hariMandor45,000.0047,000.00270,000.00282,000.00L0816.00hariOperator terlatih40,000.0045,000.00240,000.00270,000.00L0913.00hariSopir45,000.0055,000.00135,000.00165,000.00L101198.00hariBuruh tak terlatih27,500.0030,000.005,445,000.005,940,000.00L1066.00hariBuruh terlatih40,000.0030,000.00240,000.00180,000.00Material59,929,125.0061,604,500.00M02362.00m3Batu pecah 3-5 cm155,000.00160,000.009,610,000.009,920,000.00M02416.60m3Batu pecah 2-3 cm150,000.00160,000.002,490,000.002,656,000.00M02514.20m3Batu pecah 1-2 cm160,000.00175,000.002,272,000.002,485,000.00M04111.10m3Pasir beton150,000.00160,000.001,665,000.001,776,000.00M0615,500.00KgAspal7,968.758,125.0043,828,125.0044,687,500.00M1708.00setAlat bantu8,000.0010,000.0064,000.0080,000.00Peralatan5,250,000.005,775,000.00E08015.00jamMesin gilas 3 roda 8 - 10 T110,000.00125,000.001,650,000.001,875,000.00E15415.00jamSprayer aspal 200 L70,000.0075,000.001,050,000.001,125,000.00E22115.00jamDump truk ( 3,5 T ) 44 HP170,000.00185,000.002,550,000.002,775,000.0070m371,509,125.0074,216,500.0069K.6381m2MENGHAMPAR DAN MEMADATKAN LATASIR37,331.8841,629.38( MENGGUNAKAN BURUH )ASUMSI1. Memakai tenaga orang ( 1600 m2 / hari )2. Campuran dikirim ke tempat pekerjaan oleh leveransir3. BJ padat 1, 9 t / m34. Tack coat 0.6 L / m25. Menurut spec BM No. 02/PT/8/1983Pekerja749,000.00817,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0813.00hariOperator terlatih40,000.0045,000.00120,000.00135,000.00L10110.00hariBuruh tak teralatih27,500.0030,000.00275,000.00300,000.00L1038.00hariBuruh semi terlatih33,000.0035,000.00264,000.00280,000.00L0911.00hariSopir45,000.0055,000.0045,000.0055,000.00Material56,357,000.0062,890,000.00M061480.00KgAspal7,968.758,125.003,825,000.003,900,000.00M065450.00LtMinyak bakar10,000.0011,000.004,500,000.004,950,000.00M1704.00setAlat bantu8,000.0010,000.0032,000.0040,000.00K52060.00tonCampuran Latasir800,000.00900,000.0048,000,000.0054,000,000.00Peralatan2,625,000.002,900,000.00E0815.00jamMesin gilas tandem 6 - 10 T135,000.00150,000.00675,000.00750,000.00E0845.00jamMesin gilas roda karet 8 - 15 T150,000.00170,000.00750,000.00850,000.00E1545.00jamSprayer aspal 200 L70,000.0075,000.00350,000.00375,000.00E2215.00jamDump truk ( 3,5 T ) 44 HP170,000.00185,000.00850,000.00925,000.001,600m259,731,000.0066,607,000.0070K.6411m2MENGHAMPAR LAPIS PERMUKAAN ASPAL BETON ( LASTON )784,410.28911,105.56( MENGGUNAKAN ALAT)ASUMSI1. Menggunakan alat2. Hotmix dikirim leveransir sampai ke spreader3. BJ padat 2,25 t/m3 tebal padat 5 cm4. Produksi 900 m2 padat5. Disemprot tackcoat 0,4 t/m26. Spec BM No. B/PT/BMPekerja855,000.00827,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0814.00hariOperator terlatih40,000.0045,000.00160,000.00180,000.00L10112.00hariBuruh tak terlatih27,500.0030,000.00330,000.00360,000.00L1068.00hariBuruh terlatih40,000.0030,000.00320,000.00240,000.00Material30,948,462.5036,322,750.00M061350.00KgAspal7,968.758,125.002,789,062.502,843,750.00M265300.00LtMinyak bakar10,000.0011,000.003,000,000.003,300,000.00M1700.80setAlat bantu8,000.0010,000.006,400.008,000.00K640100.00tonCampuran Laston250,000.00300,000.0025,000,000.0030,000,000.00M0410.90m3Pasir Beton170,000.00190,000.00153,000.00171,000.00Peralatan3,495,000.003,850,000.00E0805.00jamMesin gilas 3 roda 8 -10 T110,000.00125,000.00550,000.00625,000.00E0815.00jamMesin gilas tandem 6 - 10 T135,000.00150,000.00675,000.00750,000.00E0845.00jamMesin gilas roda karet 8 - 15 T150,000.00170,000.00750,000.00850,000.00E1533.00jamMesin penyemprot aspal 1000 L70,000.0075,000.00210,000.00225,000.00E1575.00jamMesin penghampar 1, 82 m190,000.00200,000.00950,000.001,000,000.00E3014.00jamCompresor 210 m3 / jam90,000.00100,000.00360,000.00400,000.0045m235,298,462.5040,999,750.0071K.6501m2LAPIS SAND MIX (menggunakan tenaga manusia)43,029.6344,166.80ASUMSI :1. memakai tenaga manusia2. jarak rata-rata base camp ke lokasi pekerjaan (L) = 10 km3. tebal lapis 2 cm (padat)4. komposisi campuran :abu batu 90,00 %aspal emulsi 10,00 %67pekerja1,572.001,664.80L.0610.0034harimandor45,000.0047,000.00153.00159.80L.1010.0430haripekerja33,000.0035,000.001,419.001,505.00material40,775.6341,761.50M.2110.0264m3abu batu150,000.00160,000.003,960.004,224.00M.1334.6200kgaspal emulsi7,968.758,125.0036,815.6337,537.50peralatan682.00740.50E.0810.0017jamtandem roller110,000.00125,000.00187.00212.50E.2520.0066jamconcrete mixer75,000.0080,000.00495.00528.0072K.7101m2PERANCAH (BEKISTING) UNTUK BETON BERTULANG28,165.0030,630.00( MENGGUNAKAN BURUH)ASUMSI1. Kelompok tukang memasang 100 m2 dalam 5 hari kerja2. 1/3 material dapat dipakai kembali3. Pengadaan barang dari leveransir4. Untuk 1m3 beton menggunakan 40 lbr plywood 1,7 mm5. Tukang kayu membongkar perancahPekerja2,482,500.002,710,000.00L0615.00hariMandor45,000.0047,000.00225,000.00235,000.0068L07320.00hariTukang batu40,000.0045,000.00800,000.00900,000.00L10135.00hariBuruh tak terlatih27,500.0030,000.00962,500.001,050,000.00L10315.00hariBuruh semi terlatih33,000.0035,000.00495,000.00525,000.00Material334,000.00353,000.0020.00KgPaku jembatan14,000.0014,500.00280,000.00290,000.00M1803.00LtMinyak bakar10,000.0011,000.0030,000.0033,000.00M1703.00setAlat bantu8,000.0010,000.0024,000.0030,000.00100m22,816,500.003,063,000.0073K.7151kgPENULANGAN BETON (POTONG, BENGKOK, PASANG12,503.1013,283.16BESI TULANGAN) MENGGUNAKAN BURUHASUMSI1. 200 kg tulangan jadi disiapkan dalam 1 hari2. Besi u/ tulangan dikirim ketempat pekerjaan o/ leveransir3. Batang-batang tulangan dibengkok ditempat pekerjaan4. Penyusutan tulangan dihitung 10% dan pemakaian kawat baja 1%Pekerja206,000.00222,000.0069L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0731.00hariTukang batu40,000.0045,000.0040,000.0045,000.00L1012.00hariBuruh tak terlatih27,500.0030,000.0055,000.0060,000.00L1032.00hariBuruh semi terlatih33,000.0035,000.0066,000.0070,000.00Material2,294,620.002,434,632.50M167225.00KgBesi beton & kawat beton10,191.2010,811.702,293,020.002,432,632.50M1700.20setAlat bantu8,000.0010,000.001,600.002,000.00200kg2,500,620.002,656,632.5074K.7201m3BETON NON STRUKTUR / RABAT748,833.33810,333.33KELAS K. 125ASUMSI1. Bahan-bahan dikirim ketempat pekerjaan oleh leveransir2.Dipakai agregat pecah dan tersaring3. Hasil kerja 6 m3/hari - 6 jam (9 campuran/jam)4. Campuran 1 Pc : 3 Ps : 5 Kr5. Dalam 1m2 beton dibutuhkan 6,25 sak (40 kg/sak) PC (250 kg/m3)6. Setiap pencampuran memerlukan 30 kg semen7. Dibutuhkan untuk alas pondasi betonPekerja481,000.00522,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0731.00hariTukang batu40,000.0045,000.0040,000.0045,000.00L10112.00hariBuruh tak terlatih27,500.0030,000.00330,000.00360,000.00L1032.00hariBuruh semi terlatih33,000.0035,000.0066,000.0070,000.00Material3,012,000.003,215,000.00M0413.00m3Pasir Beton150,000.00160,000.00450,000.00480,000.00M08040.00sakSemen (40 kg)42,000.0044,000.001,680,000.001,760,000.0070M1800.20m3Kayu Bekisting1,500,000.001,800,000.00300,000.00360,000.00M1704.00setAlat bantu8,000.0010,000.0032,000.0040,000.00A1105.00m3Kerikil Pecah Tersaring110,000.00115,000.00550,000.00575,000.00Peralatan1,000,000.001,125,000.00E2525.00jamConcrete mixer 0,25 m3/10 Hp75,000.0080,000.00375,000.00400,000.00E0895.00jamAlat penggetar beton 4 HP75,000.0080,000.00375,000.00400,000.00E3415.00jamPompa air ( 5 cm ) 30 m3 / jam50,000.0065,000.00250,000.00325,000.006m34,493,000.004,862,000.0075K.7251m3BETON STRUKTUR / UNTUK KONSTRUKSI736,300.00788,166.67KELAS K. 175 (KELAS A)ASUMSI1. Bahan-bahan dikirim ketempat pekerjaan oleh leveransir2. Produksi 6,4 m3/hari. 6 jam, 9 campuran/jam3. Tidak termasuk pekerjaan pembesian4. Campuran 1 : 2 : 35. Untuk 1m3 dibutuhkan 7,5 sak (40 kg/sak)6. Perancah langsung dipasang ditempat7. Dipakai agregat pecah dan tersaringPekerja441,000.00477,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L10112.00hariBuruh tak terlatih27,500.0030,000.00330,000.00360,000.00L1032.00hariBuruh semi terlatih33,000.0035,000.0066,000.0070,000.00Material2,976,800.003,127,000.00M0413.00m3Pasir Beton150,000.00160,000.00450,000.00480,000.0071M08048.00sakSemen (40 kg)42,000.0044,000.002,016,000.002,112,000.00M1700.60setAlat bantu8,000.0010,000.004,800.006,000.00A1104.60m3Kerikil Pecah Tersaring110,000.00115,000.00506,000.00529,000.00Peralatan1,000,000.001,125,000.00E2525.00jamConcrete mixer 0,25 m3/10 Hp75,000.0080,000.00375,000.00400,000.00E0895.00jamAlat penggetar beton 4 HP75,000.0080,000.00375,000.00400,000.00E3415.00jamPompa air ( 5 cm ) 30 m3 / jam50,000.0065,000.00250,000.00325,000.006m34,417,800.004,729,000.0076K.7281m'SANDARAN PIPA BAJA SANDARAN JEMBATAN127,666.67132,200.00(menggunakan tenaga manusia)ASUMSI :1. menggunakan tenaga manusia2. bahan dasar (pipa baja) diterima seluruhnya di lokasi pekerjaan3. kapasitas pekerjaan : 10,00 m' / hari4. faktor kehilangan besi tulangan 10 %pekerja41,500.0044,200.00L.0610.1000harimandor45,000.0047,000.004,500.004,700.00L.0710.1000haritukang besi40,000.0045,000.004,000.004,500.00L.1011.0000haripekerja33,000.0035,000.0033,000.0035,000.00material86,166.6788,000.00M.2121.1000m'pipa baja galvanis diameter = 3" tb. 1 3/2 mm78,333.3380,000.0086,166.6788,000.00peralatan7277K.8101m3KONSTRUKSI PASANGAN BATU323,720.00350,400.00( MENGGUNAKAN BURUH )ASUMSI1. Dilakukan untuk pekerjaan gorong-gorong, jembatan, dinding penahan tanahdan struktur lainnya yang menggunakan konstruksi pas batu2. Material dikirim ketempat pekerjaan oleh leveransir3. Tidak termasuk galian/timbunan4. Bagian M 170 diperbolehkan pakai bambuPekerja535,000.00587,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0734.00hariTukang batu40,000.0045,000.00160,000.00180,000.00L10112.00hariBuruh tak terlatih27,500.0030,000.00330,000.00360,000.00Material983,600.001,035,000.00M0105.00m3Batu gunung115,000.00120,000.00575,000.00600,000.00M0411.20m3Pasir Beton150,000.00160,000.00180,000.00192,000.00M08019.00sakSemen42,000.0044,000.00798,000.00836,000.00M1700.70setAlat bantu8,000.0010,000.005,600.007,000.0073Peralatan100,000.00130,000.00E3412.00jamPompa air ( 5 cm ) 30 m3 / jam50,000.0065,000.00100,000.00130,000.005m31,618,600.001,752,000.0078K.8151m3BRONJONG PENAHAN332,256.00347,880.00( MENGGUNAKAN BURUH )ASUMSI1. Batu dikirim ke lapangan oleh leveransir2. Anyaman bronjong dikirim kelapangan oleh leveransir3. Selesai dalam 2 hariPekerja2,505,000.002,664,000.00L0612.00hariMandor45,000.0047,000.0090,000.0094,000.00L10170.00hariBuruh tak terlatih27,500.0030,000.001,925,000.002,100,000.00L10310.00hariBuruh semi terlatih33,000.0035,000.00330,000.00350,000.00L1064.00hariBuruh terlatih40,000.0030,000.00160,000.00120,000.00Material5,801,400.006,033,000.00M01025.00m3Batu gunung115,000.00120,000.002,875,000.003,000,000.0074M162200.00kgKawat untuk pengikat14,500.0015,000.002,900,000.003,000,000.00M1703.30setAlat bantu8,000.0010,000.0026,400.0033,000.0025m38,306,400.008,697,000.0079K.8551kmPEMBENTUKAN DAN PERATAAN BADAN JALAN199,320.00212,800.00( MENGGUNAKAN ALAT)ASUMSI1. Menggunakan alat berat2. Mandor mengawasi juga pekerjaan lain dengan baik3. Meratakan bahu jalan 5 km/hari4. Harga satuan ini untuk satu sisi bahu jalanPekerja195,000.00212,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0811.00hariOperator terlatih40,000.0045,000.0040,000.0045,000.00L1014.00hariBuruh tak terlatih27,500.0030,000.00110,000.00120,000.00Material1,600.002,000.00M1700.20setAlat bantu8,000.0010,000.001,600.002,000.00Peralatan800,000.00850,000.0075E0105.00jamGrader 110 HP160,000.00170,000.00800,000.00850,000.005km996,600.001,064,000.0080K.8601kmPERATAAN KEMBALI JALAN KERIKIL494,500.00531,000.00( MENGGUNAKAN ALAT)ASUMSI1. Menggunakan alat berat2. Mandor mengawasi juga pekerjaan lain dengan baik3. Hasil kerja grader 2 km/hariPekerja185,000.00207,000.00L0611.00hariMandor45,000.0047,000.0045,000.0047,000.00L0811.00hariOperator terlatih40,000.0045,000.0040,000.0045,