batam expo 2011

Upload: andisilu

Post on 07-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/6/2019 Batam Expo 2011

    1/26

    BATAM EXPO 20114 5 MEI 2011

    PELUANG INVESTASIPERTAMBANGAN DAN AGROINDUSTRI

    DI SULAWESI TENGGARA

    Presentasi Oleh GubernurProvinsi Sulawesi Tenggara

    H.NUR ALAM,SE

    BADAN PENANAMAN MODAL DAERAH (BPMD)

    REGIONAL INVESMENT BOARD OF SOUTHEAST SULAWESIEmail : [email protected]

    MEWUJUDKAN PERSPEKTIF

    SULAWESI TENGGARASEBAGAI PUSAT INDUSTRI

    PERTAMBANGAN NASIONAL

  • 8/6/2019 Batam Expo 2011

    2/26

    SULAWESI TENGGARAIBUKOTA : KENDARI.IBUKOTA : KENDARI.

    3 LS 6 LS DAN 120 45 BT - 124 6 BT.

  • 8/6/2019 Batam Expo 2011

    3/26

    Ibu kota KendariLuas daratan 38.140 km2Luas lautan 110.000 Km2Jumlah penduduk 2,1 juta

    3

  • 8/6/2019 Batam Expo 2011

    4/26

    VISI DAN MISI SULAWESI TENGGARA

    V I S I V I S IMEMBANGUN KESEJAHTRAAN SULAWESI TENGGARA

    TAHUN 2008-2013

    M I S IM I S I1. PENINGKATAN KWALITAS SUMBERDAYA MANUSIA.

    2. REVITALISASI PEMERINTAHAN DAERAH.

    3. PEMBANGUNAN EKONOMI.

    4. PEMBANGUNAN KEBUDAYAAN.

    5. MEMPERCEPAT PEMBANGUNAN INFRASTRUKTUR.

  • 8/6/2019 Batam Expo 2011

    5/26

    MELAKSANAKAN PELAYANAN PERIZINAN DAN NONPERIZINAN PENANAMAN MODAL MELALUI MEKANISME

    PELAYANAN TERPADU SATU PINTU (PTSP) SESUAI (PERPRESNO. 27 TAHUN 2009, PERKA BKPM NO. 11 DAN 12 TAHUN2009 DAN PERGUB NO. 28 TAHUN 2010)

    PEMBERIAN INSENTIF DAN PEMBERIAN KEMUDAHAN

    PANANAMAN MODAL DI PROVINSI SULAWESI TENGGARA(PERDA PROV. SULTRA NO. 3 TAHUN 2010)

    PENDELEGASIAN KEWENANGAN PERIZINAN DAN NONPERIZINAN INVESTASI KEPADA BPMD PROVINSI SULAWESITENGGARA (KEPUTUSAN GUBERNUR NO. 12 TAHUN 2011)

    KEBIJAKAN PEMERINTAH PROVINSI SULAWESI

    TENGGARA DALAM PERLUASAN DAN

    PENGEMBANGAN PENANAMAN MODAL

  • 8/6/2019 Batam Expo 2011

    6/26

    RENCANA PENGEMBANGAN PUSAT KAWASANEKONOMI KHUSUS SULAWESI TENGGARA

  • 8/6/2019 Batam Expo 2011

    7/26

    MELAKUKAN REVISI TATA RUANG WILAYAH PROVINSISULAWESI TENGGARA, SUBSTANSI KEHUTANAN UNTUK

    MEMBERIKAN KEPASTIAN HUKUM DALAM BERINVESTASI

    MENETAPKAN KAWASAN PERTAMBANGAN DALAM TATARUANG WILAYAH PROVINSI SULAWESI TENGGARA

    MENGEMBANGAN PUSAT KAWASAN INDUSTRIPERTAMBANGAN NASIONAL DI KONAWE UTARA, KONAWESELATAN, KOLAKA UTARA, KOLAKA DAN BUTON

    KEBIJAKAN PEMERINTAH PROVINSI SULAWESI

    TENGGARA DALAM PENGELOLAAN BIDANG

    PERTAMBANGAN DI SULAWESI TENGGARA

  • 8/6/2019 Batam Expo 2011

    8/26

  • 8/6/2019 Batam Expo 2011

    9/26

    PROFIL SULAWESI TENGGARA

    I. GAMBARAN UMUM:A. Luas wilayah: 153.018,93 Km2.

    a. Daratan : 38.139,98 Km2b. Lautan: 114.879 Km2.

    B. Terdiri dari10 Kabupaten dan 2 Kotamadya.

    C. Populasi: 2.074.974 jiwa (2008).D. KondisiPerekonomian:

    a. Pertumbuhan Ekonomi: 7,96% (2007).b. PDRB : Rp. 17.953.07 Milyar Rupiah. (2007).c. PendapatanPer Kapita: Rp. 8.837.209.76 .

    E. Sumber DayaManusia:Populasi penduduk usiakerja pada tahun2008 adalah1,386,350 jiwa.a. Jumlah Angkatan Kerja sebesar 979.256 dari jumlah usia angkatan kerja (2008).b. Jumlah Pengangguran sebesar 407.094, dari jumlah usia angkatan kerja (2008).

  • 8/6/2019 Batam Expo 2011

    10/26

    II. Infrastruktur Daerah

    A. BandarUdara yangberoperasi :a. Bandara Haluoleo (Kota Kendari)b. BandaraUdara Betoambari (Kota Bau-Bau).c. Bandara Sugimanuru (Kab. Muna).d. Bandara Saniban ( Kab. Kolaka).e. BandaraMatahora (Kab. Wakatobi).

    B. Pelabuhan:a. Pelabuhan kelas III : Pelabuhan Kendari andBau-Bau .b. Pelabuhan kelas IV: Pelabuhan Pomalaa, Kabupaten Kolaka .c. Pelabuhan kelasV : Pelabuhan Kolaka , Raha, dan Langara.

    C. Panjang Jalan: 10. 133.95 Km.a. Panjang jalan nasional : 1.293,87 Km.b. Panjang jalanProvinsi : 1.187,63 Km.c. Panjang JalanKabupaten : 7.652,45 Km.

    D. Pembangkit Listrik : KapasitasInstalasi: 480.375.318 KW.

    PROFIL SULAWESI TENGGARA

  • 8/6/2019 Batam Expo 2011

    11/26

    P EN YE ARAN N IKEL IKABUPAT EN BOMBANA , KO LAKA UTARA , KO LAKA , KONAW E UTARA ,KONAW E SELATAN , KONAW E.

    CADAN GAN N IKEL YAN G TER SED IA : 97,4 M ILYAR TON

  • 8/6/2019 Batam Expo 2011

    12/26

    NO KABUPATEN CADANGAN (TON)

    1

    2

    3

    4

    5

    6

    7

    Bombana

    Kolaka

    Buton/Bau-bau

    Kolaka Utara

    Konawe

    Konawe Selatan

    Konawe Utara

    28.200.01.40800,00

    12.819.244.028,00

    1.676.332.000,00

    2.763.796.196,00

    1.585.927.189,84

    4.348.838.160,00

    46.007.440.652,72

    J U M L A H 97.401.593.026,56

    PERSEBARAN POTENSI NIKEL DI SULAWESI TENGGARA

  • 8/6/2019 Batam Expo 2011

    13/26

  • 8/6/2019 Batam Expo 2011

    14/26

    PERSEBARAN POTENSI EMAS DI SULAWESI TENGGARA

    NO KABUPATEN CADANGAN (GRAM)

    1

    2

    3

    4

    5

    Kolaka Utara

    Kolaka

    Konawe

    Konawe Selatan

    Bombana

    35.000.000.000

    107.000.000.000

    275.000.000.000

    168.000.000.000

    540.000.000.000

    J U M L A H 1.125.000.000.000

  • 8/6/2019 Batam Expo 2011

    15/26

    PEN EBARAN ASPAL DI PULAU BUTON MENCAKUP KABUPATEN BUTON , KABUPATEN BUTONUTARA DAN KOTA BAU-BAU.

    CADANGAN ASPAL ANG TERSEDIA : 680.747.000 TON

  • 8/6/2019 Batam Expo 2011

    16/26

    NO LOKASI

    (KABUPATEN)

    LUAS

    (Ha)

    CADANGAN

    (TON)

    KADAR

    BITUMEN

    1

    2

    3

    4

    5

    6

    78

    Lawele 1/ Buton

    Lawele 2/ Buton

    Siontapina/ Buton

    Winto/ Buton

    Kabungka 1/ Buton

    Kabungka 2/ Buton

    Waisiu / ButonEpe/ Buton Utara

    1.978.20

    400,05

    1.986,30

    321,00

    1.967,67

    750,00

    3.600,002.000,00

    -

    438.622.000

    -

    3.200.000

    60.000.000

    -

    1.000.000174.725.000

    -

    -

    -

    23,35%

    15,25%

    5,25%

    12,5-40%10,35%

    J U M L A H 13.000,67 680.747.000 10,40%

    PERSEBARAN POTENSI ASPAL DI SULAWESI TENGGARA

  • 8/6/2019 Batam Expo 2011

    17/26

  • 8/6/2019 Batam Expo 2011

    18/26

    PASIR KUARSA : 5 MILYAR TONMARMER : 206 MILYAR M3

    LEMPUNG : 884 MILYAR M3

    ONIKS : 547 RIBU M3

    GAMPING : 1,6 TRILYUN M3

    MANGAN : 6.000 HA DI KAB.

    BUTON

    PASIR BESI : DI KAB. BUTON, KAB.

    KONAWE UTARA, KAB.

    KONAWE DAN KAB.

    BOMBANA

    FOSFAT : DI KAB. BUTONKROMIT : LUAS PENYEBARAN

    2.000 2.500 HA

    MAGNESIT : KAB. KOLAKA UTARA,

    KAB. KOLAKA, KAB.

    KONAWE DAN KAB.

    BOMBANA

  • 8/6/2019 Batam Expo 2011

    19/26

    Penyebaran lokasi produksi cocoa di Sulawesi

    Tenggara;

    Kolaka Utara, luas lahan 62.773 Ha,

    Produksi : 58.868 Ton/tahun

    Kolaka, luas lahan 77.919 Ha,

    Produksi: 48.473 Ton/tahun.

    Konsel, luas lahan 17.418 Ha,

    Produksi: 8.194 Ton/tahun.

    1

    2

    3

    1

    2

    3

    PabrikCocoa

  • 8/6/2019 Batam Expo 2011

    20/26

  • 8/6/2019 Batam Expo 2011

    21/26

  • 8/6/2019 Batam Expo 2011

    22/26

  • 8/6/2019 Batam Expo 2011

    23/26

    13 Lokasi bahan baku untuk industrirumput laut :

    1. TelukPao-Pao .

    2. Teluk Molawe.

    3. TelukBone .

    4. Teluk Kolono.

    5. TelukMasaloka .6. Selat Lohia .

    7. Teluk Lawele .

    8. Selat Kapuntori.

    9. Teluk Lasongko.

    10. TelukKamaru .11. TelukPasar Wajo .

    12. TelukSampolawa .

    13. Kep. Wakatobi .

    Pabrik rumput laut di Bau Bau

    11

    22

    33

    44

    5566

    77

    1111

    1212

    1010

    13139988

    1313

    1313

    Industri RumputLaut

  • 8/6/2019 Batam Expo 2011

    24/26

    AREA PENGEMBANGAN BUDIDAYA RUMPUT LAUT

    Luas Areal Budidaya : 27.385 Ha.Total Produksi : 1.786,8 ton/tahun.Dapat Dikembangkan Sampai: 83.000 Ha.

  • 8/6/2019 Batam Expo 2011

    25/26

    PRODUKSI RUMPUT LAUT DI KOTA BAU-BAU

    Tali14%

    Katinting29%

    Bibit22%

    Pemeliharaan21%

    Bambu,pelampung,

    dll14%

    Investasi awal 22 jutarupiah/HaInvestasi selanjutnya 13 jutarupiah /Ha/panen.

    INVESTASI

    eluk Buton (Kota Bau-Bau )6 7 kali panen per tahunArea lain sekitar eluk Buton3 kali panen per tahun

    WAKTU PANEN

  • 8/6/2019 Batam Expo 2011

    26/26