baru back perhitungan volume pr jljb-20-2013_2

131
BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN ITEM PEMBAYARAN NO : 3.3 (1) JENIS PEKERJAAN : PENYIAPAN BADAN JALAN SATUAN PEMBAYARAN : M2 NO STATION PANJANG AREA RATA2 VOLUME KET ( M ) ( M2 ) ( M2 ) ( M2) 1 0 + 000.00 8.00 50.00 8.000 400.00 2 0 + 050.00 8.00 50.00 8.000 400.00 3 0 + 100.00 8.00 50.00 8.000 400.00 4 0 + 150.00 8.00 50.00 8.000 400.00 5 0 + 200.00 8.00 50.00 8.000 400.00 6 0 + 250.00 8.00 50.00 8.000 400.00 7 0 + 300.00 8.00 50.00 8.000 400.00 8 0 + 350.00 8.00 50.00 8.000 400.00 9 0 + 400.00 8.00 50.00 8.000 400.00 10 0 + 450.00 8.00 50.00 8.000 400.00 11 0 + 500.00 8.00 50.00 8.000 400.00 12 0 + 550.00 8.00 50.00 8.000 400.00 13 0 + 600.00 8.00 50.00 8.000 400.00 14 0 + 650.00 8.00 50.00 8.000 400.00 15 0 + 700.00 8.00 50.00 8.000 400.00 16 0 + 750.00 8.00 50.00 8.000 400.00 17 0 + 800.00 8.00 50.00 8.000 400.00 18 0 + 850.00 8.00 50.00 8.000 400.00 19 0 + 900.00 8.00 50.00 8.000 400.00 20 0 + 950.00 8.00 50.00 8.000 400.00 21 1 + 000.00 8.00 50.00 8.000 400.00 22 1 + 050.00 8.00 50.00 8.000 400.00 23 1 + 100.00 8.00 50.00 8.000 400.00 24 1 + 150.00 8.00 50.00 8.000 400.00 25 1 + 200.00 8.00 50.00 8.000 400.00 26 1 + 250.00 8.00 50.00 8.000 400.00 27 1 + 300.00 8.00 50.00 8.000 400.00 28 1 + 350.00 8.00 50.00 8.000 400.00 29 1 + 400.00 8.00 50.00 8.000 400.00 30 1 + 450.00 8.00

Upload: heri-adi

Post on 10-Apr-2016

55 views

Category:

Documents


5 download

DESCRIPTION

ghjkm

TRANSCRIPT

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.3 (1) JENIS PEKERJAAN : PENYIAPAN BADAN JALAN

SATUAN PEMBAYARAN : M2

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M2)

1 0 + 000.00 8.00 50.00 8.000 400.00

2 0 + 050.00 8.00 50.00 8.000 400.00

3 0 + 100.00 8.00 50.00 8.000 400.00

4 0 + 150.00 8.00 50.00 8.000 400.00

5 0 + 200.00 8.00 50.00 8.000 400.00

6 0 + 250.00 8.00 50.00 8.000 400.00

7 0 + 300.00 8.00 50.00 8.000 400.00

8 0 + 350.00 8.00 50.00 8.000 400.00

9 0 + 400.00 8.00 50.00 8.000 400.00

10 0 + 450.00 8.00 50.00 8.000 400.00

11 0 + 500.00 8.00 50.00 8.000 400.00

12 0 + 550.00 8.00 50.00 8.000 400.00

13 0 + 600.00 8.00 50.00 8.000 400.00

14 0 + 650.00 8.00 50.00 8.000 400.00

15 0 + 700.00 8.00 50.00 8.000 400.00

16 0 + 750.00 8.00 50.00 8.000 400.00

17 0 + 800.00 8.00 50.00 8.000 400.00

18 0 + 850.00 8.00 50.00 8.000 400.00

19 0 + 900.00 8.00 50.00 8.000 400.00

20 0 + 950.00 8.00 50.00 8.000 400.00

21 1 + 000.00 8.00 50.00 8.000 400.00

22 1 + 050.00 8.00 50.00 8.000 400.00

23 1 + 100.00 8.00 50.00 8.000 400.00

24 1 + 150.00 8.00 50.00 8.000 400.00

25 1 + 200.00 8.00 50.00 8.000 400.00

26 1 + 250.00 8.00 50.00 8.000 400.00

27 1 + 300.00 8.00 50.00 8.000 400.00

28 1 + 350.00 8.00 50.00 8.000 400.00

29 1 + 400.00 8.00 50.00 8.000 400.00

30 1 + 450.00 8.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.3 (1) JENIS PEKERJAAN : PENYIAPAN BADAN JALAN

SATUAN PEMBAYARAN : M2

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M2)

50.00 8.000 400.00 31 1 + 500.00 8.000

50.00 8.000 400.00 32 1 + 550.00 8.000

50.00 8.000 400.00 33 1 + 600.00 8.000

50.00 8.000 400.00 34 1 + 650.00 8.000

50.00 8.000 400.00 35 1 + 700.00 8.000

50.00 8.000 400.00 36 1 + 750.00 8.000

50.00 8.000 400.00 37 1 + 800.00 8.000

50.00 8.000 400.00 38 1 + 850.00 8.000

50.00 8.000 400.00 39 1 + 900.00 8.000

50.00 8.000 400.00 40 1 + 950.00 8.000

50.00 8.000 400.00 41 2 + 000.00 8.000

50.00 8.000 400.00 42 2 + 050.00 8.000

50.00 8.000 400.00 43 2 + 100.00 8.000

50.00 8.000 400.00 44 2 + 150.00 8.000

50.00 8.000 400.00 45 2 + 200.00 8.000

50.00 8.000 400.00 46 2 + 250.00 8.000

50.00 8.000 400.00 47 2 + 300.00 8.000

50.00 8.000 400.00 48 2 + 350.00 8.000

50.00 8.000 400.00 49 2 + 400.00 8.000

50.00 8.000 400.00 50 2 + 450.00 8.000

50.00 8.000 400.00 51 2 + 500.00 8.000

50.00 8.000 400.00 52 2 + 550.00 8.000

50.00 8.000 400.00 53 2 + 600.00 8.000

50.00 8.000 400.00 54 2 + 650.00 8.000

50.00 8.000 400.00 55 2 + 700.00 8.000

50.00 8.000 400.00 56 2 + 750.00 8.000

50.00 8.000 400.00 57 2 + 800.00 8.000

50.00 8.000 400.00 58 2 + 850.00 8.000

50.00 8.000 400.00 59 2 + 900.00 8.000

50.00 8.000 400.00 60 2 + 950.00 8.000

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.3 (1) JENIS PEKERJAAN : PENYIAPAN BADAN JALAN

SATUAN PEMBAYARAN : M2

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M2)

50.00 8.000 400.00 61 3 + 000.00 8.000

50.00 8.000 400.00 62 3 + 050.00 8.000

50.00 8.000 400.00 63 3 + 100.00 8.000

50.00 8.000 400.00 64 3 + 150.00 8.000

50.00 8.000 400.00 65 3 + 200.00 8.000

50.00 8.000 400.00 66 3 + 250.00 8.000

50.00 8.000 400.00 67 3 + 300.00 8.000

50.00 8.000 400.00 68 3 + 350.00 8.000

50.00 8.000 400.00 69 3 + 400.00 8.000

50.00 8.000 400.00 70 3 + 450.00 8.000

50.00 8.000 400.00 71 3 + 500.00 8.000

50.00 8.000 400.00 72 3 + 550.00 8.000

50.00 8.000 400.00 73 3 + 600.00 8.000

50.00 8.000 400.00 74 3 + 650.00 8.000

50.00 8.000 400.00 75 3 + 700.00 8.000

50.00 8.000 400.00 76 3 + 750.00 8.000

50.00 8.000 400.00 77 3 + 800.00 8.000

50.00 8.000 400.00 78 3 + 850.00 8.000

50.00 8.000 400.00 79 3 + 900.00 8.000

50.00 8.000 400.00 80 3 + 950.00 8.000

50.00 8.000 400.00 81 4 + 000.00 8.000

50.00 8.000 400.00 82 4 + 050.00 8.000

50.00 8.000 400.00 83 4 + 100.00 8.000

50.00 8.000 400.00 84 4 + 150.00 8.000

50.00 8.000 400.00 85 4 + 200.00 8.000

50.00 8.000 400.00 86 4 + 250.00 8.000

50.00 8.000 400.00 87 4 + 300.00 8.000

50.00 8.000 400.00 88 4 + 350.00 8.000

50.00 8.000 400.00 89 4 + 400.00 8.000

50.00 8.000 400.00 90 4 + 450.00 8.000

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.3 (1) JENIS PEKERJAAN : PENYIAPAN BADAN JALAN

SATUAN PEMBAYARAN : M2

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M2)

50.00 8.000 400.00 91 4 + 500.00 8.000

50.00 8.000 400.00 92 4 + 550.00 8.000

50.00 8.000 400.00 93 4 + 600.00 8.000

50.00 8.000 400.00 94 4 + 650.00 8.000

50.00 8.000 400.00 95 4 + 700.00 8.000

50.00 8.000 400.00 96 4 + 750.00 8.000

50.00 8.000 400.00 97 4 + 800.00 8.000

50.00 8.000 400.00 98 4 + 850.00 8.000

50.00 8.000 400.00 99 4 + 900.00 8.000

50.00 8.000 400.00 100 4 + 950.00 8.000

50.00 8.000 400.00 101 5 + 000.00 8.000

50.00 8.000 400.00 102 5 + 050.00 8.000

50.00 8.000 400.00 103 5 + 100.00 8.000

50.00 8.000 400.00 104 5 + 150.00 8.000

50.00 8.000 400.00 105 5 + 200.00 8.000

50.00 8.000 400.00 106 5 + 250.00 8.000

50.00 8.000 400.00 107 5 + 300.00 8.000

50.00 8.000 400.00 108 5 + 350.00 8.000

50.00 8.000 400.00 109 5 + 400.00 8.000

50.00 8.000 400.00 110 5 + 450.00 8.000

50.00 8.000 400.00 111 5 + 500.00 8.000

50.00 8.000 400.00 112 5 + 550.00 8.000

50.00 8.000 400.00 113 5 + 600.00 8.000

50.00 8.000 400.00 114 5 + 650.00 8.000

50.00 8.000 400.00 115 5 + 700.00 8.000

50.00 8.000 400.00 116 5 + 750.00 8.000

50.00 8.000 400.00 117 5 + 800.00 8.000

50.00 8.000 400.00 118 5 + 850.00 8.000

50.00 8.000 400.00 119 5 + 900.00 8.000

50.00 8.000 400.00 120 5 + 950.00 8.000

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.3 (1) JENIS PEKERJAAN : PENYIAPAN BADAN JALAN

SATUAN PEMBAYARAN : M2

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M2)

50.00 8.000 400.00 121 6 + 000.00 8.000

50.00 8.000 400.00 122 6 + 050.00 8.000

50.00 8.000 400.00 123 6 + 100.00 8.000

50.00 8.000 400.00 124 6 + 150.00 8.000

50.00 8.000 400.00 125 6 + 200.00 8.000

50.00 8.000 400.00 126 6 + 250.00 8.000

50.00 8.000 400.00 127 6 + 300.00 8.000

50.00 8.000 400.00 128 6 + 350.00 8.000

50.00 8.000 400.00 129 6 + 400.00 8.000

50.00 8.000 400.00 130 6 + 450.00 8.000

50.00 8.000 400.00 131 6 + 500.00 8.000

50.00 8.000 400.00 132 6 + 550.00 8.000

50.00 8.000 400.00 133 6 + 600.00 8.000

50.00 8.000 400.00 134 6 + 650.00 8.000

50.00 8.000 400.00 135 6 + 700.00 8.000

50.00 8.000 400.00 136 6 + 750.00 8.000

50.00 8.000 400.00 137 6 + 800.00 8.000

50.00 8.000 400.00 138 6 + 850.00 8.000

50.00 8.000 400.00 139 6 + 900.00 8.000

50.00 8.000 400.00 140 6 + 950.00 8.000

50.00 8.000 400.00 141 7 + 000.00 8.000

50.00 8.000 400.00 142 7 + 050.00 8.000

50.00 8.000 400.00 143 7 + 100.00 8.000

50.00 8.000 400.00 144 7 + 150.00 8.000

50.00 8.000 400.00 145 7 + 200.00 8.000

50.00 8.000 400.00 146 7 + 250.00 8.000

50.00 8.000 400.00 147 7 + 300.00 8.000

50.00 8.000 400.00 148 7 + 350.00 8.000

50.00 8.000 400.00 149 7 + 400.00 8.000

50.00 8.000 400.00 150 7 + 450.00 8.000

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.3 (1) JENIS PEKERJAAN : PENYIAPAN BADAN JALAN

SATUAN PEMBAYARAN : M2

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M2)

50.00 8.000 400.00 151 7 + 500.00 8.000

50.00 8.000 400.00 152 7 + 550.00 8.000

50.00 8.000 400.00 153 7 + 600.00 8.000

50.00 8.000 400.00 154 7 + 650.00 8.000

50.00 8.000 400.00 155 7 + 700.00 8.000

50.00 8.000 400.00 156 7 + 750.00 8.000

50.00 8.000 400.00 - 157 7 + 800.00 8.000

50.00 8.000 400.00 158 7 + 850.00 8.000

50.00 8.000 400.00 159 7 + 900.00 8.000

50.00 8.000 400.00 160 7 + 950.00 8.000

50.00 8.000 400.00 161 8 + 000.00 8.000

50.00 8.000 400.00 162 8 + 050.00 8.000

50.00 8.000 400.00 163 8 + 100.00 8.000

50.00 8.000 400.00 164 8 + 150.00 8.000

50.00 8.000 400.00 165 8 + 200.00 8.000

50.00 8.000 400.00 166 8 + 250.00 8.000

50.00 8.000 400.00 167 8 + 300.00 8.000

50.00 8.000 400.00 168 8 + 350.00 8.000

50.00 8.000 400.00 169 8 + 400.00 8.000

50.00 8.000 400.00 170 8 + 450.00 8.000

50.00 8.000 400.00 171 8 + 500.00 8.000

50.00 8.000 400.00 172 8 + 550.00 8.000

50.00 8.000 400.00 173 8 + 600.00 8.000

50.00 8.000 400.00 174 8 + 650.00 8.000

50.00 8.000 400.00 175 8 + 700.00 8.000

50.00 8.000 400.00 176 8 + 750.00 8.000

50.00 8.000 400.00 177 8 + 800.00 8.000

50.00 8.000 400.00 178 8 + 850.00 8.000

50.00 8.000 400.00 179 8 + 900.00 8.000

50.00 8.000 400.00 180 8 + 950.00 8.000

50.00 8.000 400.00 181 9 + 000.00 8.000

Jumlah 72,000.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

1 0 + 000.0050.00 -

2 0 + 050.00 0.500 50.00 0.500 25.00

3 0 + 100.00 0.500 19.00 0.250 4.75

4 0 + 119.00 - 9.00 - -

5 0 + 128.00 - 22.00 0.250 5.50

6 0 + 150.00 0.500 50.00 1.000 50.00

7 0 + 200.00 1.500 50.00 1.500 75.01

8 0 + 250.00 1.500 50.00 1.535 76.77

9 0 + 300.00 1.571 36.00 0.785 28.27

10 0 + 336.00 - 7.00 - -

11 0 + 343.00 - 7.00 0.947 6.63

12 0 + 350.00 1.895 2.00 0.947 1.89

13 0 + 352.00 - 12.00 - -

14 0 + 364.00 - 36.00 0.750 27.00

15 0 + 400.00 1.500 50.00 1.500 75.01

16 0 + 450.00 1.500 50.00 1.500 75.01

17 0 + 500.00 1.500 50.00 1.573 78.66

18 0 + 550.00 1.646 50.00 1.573 78.66

19 0 + 600.00 1.500 50.00 1.500 75.00

20 0 + 650.00 1.500 50.00 1.550 77.50

21 0 + 700.00 1.600 25.00 0.800 20.00

22 0 + 725.00 - 5.00 - -

23 0 + 730.00 - 20.00 0.800 16.00

24 0 + 750.00 1.600 50.00 1.550 77.50

25 0 + 800.00 1.500 50.00 1.500 75.00

26 0 + 850.00 1.500 50.00 1.500 75.01

27 0 + 900.00 1.500 50.00 1.500 75.01

28 0 + 950.00 1.500 50.00 1.500 75.01

29 1 + 000.00 1.500 50.00 1.500 75.01

30 1 + 050.00 1.500

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

50.00 1.500 75.01 31 1 + 100.00 1.500

50.00 0.750 37.50 32 1 + 150.00 -

6.00 - - 33 1 + 156.00 -

44.00 0.750 33.00 34 1 + 200.00 1.500

50.00 1.500 75.00 35 1 + 250.00 1.500

50.00 1.519 75.95 36 1 + 300.00 1.538

50.00 1.570 78.50 37 1 + 350.00 1.602

50.00 1.301 65.05 38 1 + 400.00 1.000

50.00 1.275 63.75 39 1 + 450.00 1.550

26.00 0.775 20.15 40 1 + 476.00 -

8.00 - - 41 1 + 484.00 -

16.00 0.750 12.00 42 1 + 500.00 1.500

50.00 1.507 75.35 43 1 + 550.00 1.514

50.00 1.864 93.20 44 1 + 600.00 2.214

50.00 2.214 110.70 45 1 + 650.00 2.214

40.00 1.107 44.28 46 1 + 690.00 -

6.00 - - 47 1 + 696.00 -

4.00 1.254 5.02 48 1 + 700.00 2.508

50.00 2.361 118.05 49 1 + 750.00 2.214

50.00 1.886 94.28 50 1 + 800.00 1.557

50.00 1.529 76.43 51 1 + 850.00 1.500

50.00 1.500 75.00 52 1 + 900.00 1.500

50.00 1.500 75.00 53 1 + 950.00 1.500

34.00 0.750 25.50 54 1 + 984.00 -

8.00 - - 55 1 + 992.00 -

8.00 0.872 6.98 56 2 + 000.00 1.744

50.00 1.687 84.33 57 2 + 050.00 1.629

50.00 1.922 96.08 58 2 + 100.00 2.214

50.00 1.483 74.15 59 2 + 150.00 0.752

50.00 0.863 43.15 60 2 + 200.00 0.974

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

50.00 0.976 48.80 61 2 + 250.00 0.978

50.00 0.989 49.43 62 2 + 300.00 0.999

50.00 1.341 67.05 63 2 + 350.00 1.683

50.00 1.956 97.80 64 2 + 400.00 2.229

45.00 1.115 50.15 65 2 + 445.00 -

4.00 - - 66 2 + 449.00 -

1.00 - - 67 2 + 450.00 -

50.00 0.250 12.50 68 2 + 500.00 0.500

50.00 0.500 25.00 69 2 + 550.00 0.500

50.00 1.034 51.70 70 2 + 600.00 1.568

10.00 0.784 7.84 71 2 + 610.00 -

4.30 - - 72 2 + 614.30 -

35.70 1.085 38.72 73 2 + 650.00 2.169

50.00 2.170 108.51 74 2 + 700.00 2.171

48.00 1.086 52.11 75 2 + 748.00 -

2.00 0.250 0.50 76 2 + 750.00 0.500

48.00 0.250 12.00 77 2 + 798.00 -

2.00 - - 78 2 + 800.00 -

50.00 0.610 30.50 79 2 + 850.00 1.220

50.00 1.813 90.63 80 2 + 900.00 2.405

50.00 2.060 102.98 81 2 + 950.00 1.714

50.00 1.290 64.50 82 3 + 000.00 0.866

50.00 1.467 73.35 83 3 + 050.00 2.068

50.00 1.458 72.90 84 3 + 100.00 0.848

50.00 0.982 49.08 85 3 + 150.00 1.115

50.00 0.990 49.48 86 3 + 200.00 0.864

50.00 0.782 39.10 87 3 + 250.00 0.700

50.00 1.190 59.50 88 3 + 300.00 1.680

50.00 1.803 90.13 89 3 + 350.00 1.925

50.00 1.889 94.43 90 3 + 400.00 1.852

50.00 1.740 86.98 91 3 + 450.00 1.627

50.00 1.650 82.50 92 3 + 500.00 1.673

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

92 3 + 500.007.00

1.673 0.837 5.86

93 3 + 507.00 -

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

7.00 - - 94 3 + 514.00 -

36.00 0.250 9.00 95 3 + 550.00 0.500

50.00 1.287 64.33 96 3 + 600.00 2.073

50.00 2.375 118.73 97 3 + 650.00 2.676

50.00 1.876 93.78 98 3 + 700.00 1.075

50.00 1.031 51.55 99 3 + 750.00 0.987

50.00 1.123 56.15 100 3 + 800.00 1.259

50.00 0.880 43.98 3 + 850.00 0.500

101 50.00 1.380 68.98 3 + 900.00 2.26

102 50.00 - 3 + 950.00 0.950

103 50.00 1.132 56.60 4 + 000.00 1.314

104 50.00 0.907 45.35 4 + 050.00 0.500

105 5.00 0.250 1.25 4 + 055.00 -

106 8.40 - - 4 + 063.40 -

107 36.60 0.642 23.48 4 + 100.00 1.283

108 50.00 0.998 49.90 4 + 150.00 0.713

109 50.00 1.207 60.33 4 + 200.00 1.700

110 50.00 1.351 67.53 4 + 250.00 1.001

111 50.00 0.899 44.93 4 + 300.00 0.796

112 50.00 1.026 51.28 4 + 350.00 1.255

113 50.00 1.200 60.00 4 + 400.00 1.145

114 50.00 1.041 52.03 4 + 450.00 0.936

115 50.00 1.110 55.48 4 + 500.00 1.283

116 50.00 1.059 52.93 4 + 550.00 0.834

117 50.00 1.162 58.08 4 + 600.00 1.489

118 50.00 1.405 70.23 4 + 650.00 1.320

119 50.00 1.733 86.63 4 + 700.00 2.145

120 50.00 1.323 66.13 4 + 750.00 0.500

121 50.00 1.086 54.30 4 + 800.00 1.672

122 50.00 1.282 64.10 4 + 850.00 0.892

123 50.00 1.092 54.60 4 + 900.00 1.292

124 50.00 1.303 65.13 4 + 950.00 1.313

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

4 + 950.00 1.313

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

125 50.00 0.907 45.33 5 + 000.00 0.500

126 50.00 0.556 27.78 5 + 050.00 0.611

127 50.00 1.025 51.25 5 + 100.00 1.439

128 50.00 1.041 52.05 5 + 150.00 0.643

129 50.00 0.749 37.43 5 + 200.00 0.854

130 50.00 0.677 33.85 5 + 250.00 0.500

131 50.00 1.183 59.15 5 + 300.00 1.866

132 50.00 1.928 96.38 5 + 350.00 1.989

133 50.00 2.185 109.25 5 + 400.00 2.381

134 50.00 2.128 106.40 5 + 450.00 1.875

135 50.00 1.683 84.13 5 + 500.00 1.490

136 50.00 1.795 89.73 5 + 550.00 2.099

137 50.00 1.333 66.65 5 + 600.00 0.567

138 50.00 0.753 37.63 5 + 650.00 0.938

139 50.00 0.719 35.95 5 + 700.00 0.500

140 50.00 1.358 67.88 5 + 750.00 2.215

50.00 1.565 78.23 141 5 + 800.00 0.914

50.00 0.828 41.40 142 5 + 850.00 0.742

50.00 1.257 62.85 143 5 + 900.00 1.772

50.00 1.616 80.80 144 5 + 950.00 1.460

50.00 1.522 76.10 145 6 + 000.00 1.584

50.00 1.336 66.78 146 6 + 050.00 1.087

50.00 1.816 90.80 147 6 + 100.00 2.545

50.00 2.719 135.93 148 6 + 150.00 2.892

50.00 2.193 109.63 149 6 + 200.00 1.493

50.00 1.376 68.80 150 6 + 250.00 1.259

50.00 1.203 60.13 151 6 + 300.00 1.146

50.00 0.966 48.30 152 6 + 350.00 0.786

50.00 0.643 32.15 153 6 + 400.00 0.500

50.00 0.500 25.00 154 6 + 450.00 0.500

50.00 0.942 47.08 155 6 + 500.00 1.383

50.00 1.119 55.93 156 6 + 550.00 0.854

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

156 6 + 550.00 0.854

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

50.00 0.960 47.98 157 6 + 600.00 1.065

50.00 1.092 54.58 158 6 + 650.00 1.118

50.00 0.809 40.45 159 6 + 700.00 0.500

50.00 0.662 33.10 160 6 + 750.00 0.824

50.00 1.034 51.70 161 6 + 800.00 1.244

50.00 1.195 59.73 162 6 + 850.00 1.145

50.00 1.372 68.58 163 6 + 900.00 1.598

50.00 1.424 71.20 164 6 + 950.00 1.250

50.00 2.012 100.58 165 7 + 000.00 2.773

50.00 2.566 128.28 166 7 + 050.00 2.358

50.00 2.319 115.95 167 7 + 100.00 2.280

50.00 1.859 92.93 168 7 + 150.00 1.437

50.00 1.397 69.85 169 7 + 200.00 1.357

50.00 1.357 67.85 170 7 + 250.00 1.357

50.00 1.658 82.90 171 7 + 300.00 1.959

50.00 1.307 65.33 172 7 + 350.00 0.654

50.00 1.009 50.45 173 7 + 400.00 1.364

50.00 1.074 53.68 174 7 + 450.00 0.783

50.00 0.779 38.93 175 7 + 500.00 0.774

50.00 0.637 31.85 176 7 + 550.00 0.500

50.00 0.500 25.00 177 7 + 600.00 0.500

50.00 0.500 25.00 178 7 + 650.00 0.500

30.00 0.250 7.50 179 7 + 680.00 -

20.00 - - 180 7 + 700.00 -

50.00 0.250 12.50 181 7 + 750.00 0.500

50.00 1.504 75.18 182 7 + 800.00 2.507

50.00 1.504 75.18 183 7 + 850.00 0.50

50.00 0.500 25.00 184 7 + 900.00 0.500

50.00 0.500 25.00 185 7 + 950.00 0.500

50.00 0.972 48.60 186 8 + 000.00 1.444

15.00 0.722 10.83 187 8 + 015.00 -

5.00 - - 188 8 + 020.00 -

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

188 8 + 020.0030.00

- 0.200 6.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.2.2 JENIS PEKERJAAN : Timbunan Pilihan

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

189 8 + 050.00 0.400 50.00 1.314 65.70

190 8 + 100.00 2.228 50.00 2.222 111.08

191 8 + 150.00 2.215 50.00 2.215 110.75

192 8 + 200.00 2.215 50.00 2.215 110.75

193 8 + 250.00 2.215 50.00 2.215 110.75

194 8 + 300.00 2.215 50.00 2.215 110.75

195 8 + 350.00 2.215 50.00 2.095 104.75

196 8 + 400.00 1.975 50.00 2.593 129.63

197 8 + 450.00 3.210 50.00 2.635 131.75

198 8 + 500.00 2.060 50.00 1.718 85.90

199 8 + 550.00 1.376 50.00 1.986 99.30

200 8 + 600.00 2.596 50.00 2.233 111.65

201 8 + 650.00 1.870 50.00 1.656 82.80

202 8 + 700.00 1.442 50.00 1.379 68.95

203 8 + 750.00 1.316 50.00 1.334 66.70

204 8 + 800.00 1.352 50.00 1.675 83.73

205 8 + 850.00 1.997 50.00 2.012 100.58

206 8 + 900.00 2.026 50.00 1.999 99.95

207 8 + 950.00 1.972 50.00 1.860 92.98

208 9 + 000.00 1.747 50.00 0.874 43.68

209

jumlah 11,807.65

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.2.1 JENIS PEKERJAAN : Timbunan Biasa

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

1 0 + 000.0050.00 -

2 0 + 050.0050.00 - -

3 0 + 100.0050.00 - -

4 0 + 150.0050.00 - -

5 0 + 200.0050.00 - -

6 0 + 250.0050.00 - -

7 0 + 300.0050.00 - -

8 0 + 350.0050.00 - -

9 0 + 400.0050.00 - -

10 0 + 450.0050.00 - -

11 0 + 500.0050.00 - -

12 0 + 550.0050.00 0.525 26.25

13 0 + 600.00 1.050 50.00 0.525 26.25

14 0 + 650.0050.00 - -

15 0 + 700.0050.00 - -

16 0 + 750.0050.00 - -

17 0 + 800.0050.00 - -

18 0 + 850.0050.00 - -

19 0 + 900.0050.00 - -

20 0 + 950.0050.00 - -

21 1 + 000.0050.00 - -

22 1 + 050.0050.00 - -

23 1 + 100.0050.00 - -

24 1 + 150.0050.00 - -

25 1 + 200.0050.00 - -

26 1 + 250.0050.00 - -

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.2.1 JENIS PEKERJAAN : Timbunan Biasa

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

27 1 + 300.0050.00 - -

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.2.1 JENIS PEKERJAAN : Timbunan Biasa

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

27 1 + 300.0050.00 - -

28 1 + 350.0050.00 - -

29 1 + 400.0050.00 - -

30 1 + 450.0050.00 - -

31 1 + 500.0050.00 - -

32 1 + 550.0050.00 - -

33 1 + 600.0050.00 - -

34 1 + 650.0050.00 - -

35 1 + 700.0050.00 - -

36 1 + 750.0050.00 - -

37 1 + 800.0050.00 - -

38 1 + 850.0050.00 - -

39 1 + 900.0050.00 - -

40 1 + 950.0050.00 - -

41 2 + 000.0050.00 - -

42 2 + 050.0050.00 - -

43 2 + 100.0050.00 - -

44 2 + 150.0050.00 - -

45 2 + 200.0050.00 - -

46 2 + 250.0050.00 - -

47 2 + 300.0050.00 - -

48 2 + 350.0050.00 - -

49 2 + 400.0050.00 - -

50 2 + 450.0050.00 - -

51 2 + 500.0050.00 - -

52 2 + 550.0050.00 - -

53 2 + 600.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.2.1 JENIS PEKERJAAN : Timbunan Biasa

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

53 2 + 600.0050.00 - -

54 2 + 650.0050.00 - -

55 2 + 700.0050.00 - -

56 2 + 750.0050.00 - -

57 2 + 800.0050.00 - -

58 2 + 850.0050.00 - -

59 2 + 900.0050.00 - -

60 2 + 950.0050.00 - -

61 3 + 000.0050.00 - -

62 3 + 050.0050.00 - -

63 3 + 100.0050.00 - -

64 3 + 150.0050.00 - -

65 3 + 200.0050.00 - -

66 3 + 250.0050.00 - -

67 3 + 300.0050.00 - -

68 3 + 350.0050.00 - -

69 3 + 400.0050.00 - -

70 3 + 450.0050.00 - -

71 3 + 500.0050.00 - -

72 3 + 550.0050.00 - -

73 3 + 600.0050.00 - -

74 3 + 650.0050.00 - -

75 3 + 700.0050.00 - -

76 3 + 750.0050.00 - -

77 3 + 800.0050.00 - -

78 3 + 850.0050.00 - -

79 3 + 900.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.2.1 JENIS PEKERJAAN : Timbunan Biasa

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

79 3 + 900.0050.00 -

80 3 + 950.0050.00 - -

81 4 + 000.0050.00 - -

82 4 + 050.0050.00 - -

83 4 + 100.0050.00 - -

84 4 + 150.0050.00 - -

85 4 + 200.0050.00 - -

86 4 + 250.0050.00 - -

87 4 + 300.0050.00 - -

88 4 + 350.0050.00 - -

89 4 + 400.0050.00 - -

90 4 + 450.0050.00 0.525 26.25

91 4 + 500.00 1.050 50.00 0.525 26.25

92 4 + 550.0050.00 - -

93 4 + 600.0050.00 - -

94 4 + 650.0050.00 - -

95 4 + 700.0050.00 - -

96 4 + 750.0050.00 - -

97 4 + 800.0050.00 - -

98 4 + 850.0050.00 - -

99 4 + 900.0050.00 - -

100 4 + 950.0050.00 - -

101 5 + 000.0050.00 - -

102 5 + 050.0050.00 - -

103 5 + 100.0050.00 - -

104 5 + 150.0050.00 - -

105 5 + 200.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.2.1 JENIS PEKERJAAN : Timbunan Biasa

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

105 5 + 200.0050.00 - -

106 5 + 250.0050.00 - -

107 5 + 300.0050.00 - -

108 5 + 350.0050.00 - -

109 5 + 400.0050.00 - -

110 5 + 450.0050.00 - -

111 5 + 500.0050.00 - -

112 5 + 550.0050.00 - -

113 5 + 600.0050.00 - -

114 5 + 650.0050.00 - -

115 5 + 700.0050.00 - -

116 5 + 750.0050.00 - -

117 5 + 800.0050.00 - -

118 5 + 850.0050.00 - -

119 5 + 900.0050.00 - -

120 5 + 950.0050.00 - -

121 6 + 000.0050.00 - -

122 6 + 050.0050.00 - -

123 6 + 100.0050.00 - -

124 6 + 150.0050.00 - -

125 6 + 200.0050.00 - -

126 6 + 250.0050.00 - -

127 6 + 300.0050.00 - -

128 6 + 350.0050.00 - -

129 6 + 400.0050.00 - -

130 6 + 450.0050.00 - -

131 6 + 500.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.2.1 JENIS PEKERJAAN : Timbunan Biasa

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

131 6 + 500.0050.00 - -

132 6 + 550.0050.00 - -

133 6 + 600.0050.00 - -

134 6 + 650.0050.00 - -

135 6 + 700.0050.00 - -

136 6 + 750.0050.00 - -

137 6 + 800.0050.00 - -

138 6 + 850.0050.00 - -

139 6 + 900.0050.00 - -

140 6 + 950.0050.00 - -

141 7 + 000.0050.00 - -

142 7 + 050.0050.00 - -

143 7 + 100.0050.00 - -

144 7 + 150.0050.00 - -

145 7 + 200.0050.00 - -

146 7 + 250.0050.00 - -

147 7 + 300.0050.00 - -

148 7 + 350.0050.00 - -

149 7 + 400.0050.00 - -

150 7 + 450.0050.00 - -

151 7 + 500.0050.00 - -

152 7 + 550.0050.00 - -

153 7 + 600.0050.00 - -

154 7 + 650.0050.00 - -

155 7 + 700.0050.00 - -

156 7 + 750.0050.00

- -

157 7 + 800.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.2.1 JENIS PEKERJAAN : Timbunan Biasa

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

157 7 + 800.0050.00 -

158 7 + 850.0050.00 - -

159 7 + 900.0050.00 - -

160 7 + 950.0050.00 - -

161 8 + 000.0050.00 - -

162 8 + 050.0050.00 - -

163 8 + 100.0050.00 - -

164 8 + 150.0050.00 - -

165 8 + 200.0050.00 - -

166 8 + 250.0050.00 - -

167 8 + 300.0050.00 - -

168 8 + 350.0050.00 0.525 26.25

169 8 + 400.00 1.050 50.00 0.525 26.25

170 8 + 450.0050.00 - -

171 8 + 500.0050.00 - -

172 8 + 550.0050.00 - -

173 8 + 600.0050.00 - -

174 8 + 650.0050.00 - -

175 8 + 700.0050.00 - -

176 8 + 750.0050.00 - -

177 8 + 800.0050.00 - -

178 8 + 850.0050.00 - -

179 8 + 900.0050.00 - -

180 8 + 950.0050.00 - -

181 9 + 000.0050.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.1 JENIS PEKERJAAN : Galian Biasa

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

1 0 + 000.00 0.50 50.00 -

2 0 + 050.00 2.483 50.00 3.168 158.38

3 0 + 100.00 3.852 19.00 1.926 36.59

4 0 + 119.00 - 9.00 - -

5 0 + 128.00 - 22.00 1.626 35.77

6 0 + 150.00 3.252 50.00 3.049 152.45

7 0 + 200.00 2.846 50.00 2.612 130.60

8 0 + 250.00 2.378 50.00 1.807 90.35

9 0 + 300.00 1.236 36.00 0.618 22.25

10 0 + 336.00 - 7.00 - -

11 0 + 343.00 - 7.00 0.717 5.02

12 0 + 350.00 1.434 2.00 0.717 1.43

13 0 + 352.00 - 12.00 - -

14 0 + 364.00 - 36.00 1.252 45.07

15 0 + 400.00 2.504 50.00 2.577 128.83

16 0 + 450.00 2.649 50.00 2.369 118.43

17 0 + 500.00 2.088 50.00 1.886 94.28

18 0 + 550.00 1.683 50.00 2.132 106.58

19 0 + 600.00 2.580 50.00 2.367 118.35

20 0 + 650.00 2.154 50.00 2.231 111.55

21 0 + 700.00 2.308 25.00 1.154 28.85

22 0 + 725.00 - 5.00 - -

23 0 + 730.00 - 20.00 1.064 21.27

24 0 + 750.00 2.127 50.00 1.826 91.28

25 0 + 800.00 1.524 50.00 2.115 105.75

26 0 + 850.00 2.706 50.00 2.310 115.50

27 0 + 900.00 1.914 50.00 2.000 99.98

28 0 + 950.00 2.085 50.00 2.371 118.53

29 1 + 000.00 2.656 50.00 2.482 124.08

30 1 + 050.00 2.307 50.00 2.021 101.03

31 1 + 100.00 1.734 50.00 0.867 43.35

32 1 + 150.00 - 6.00 - -

33 1 + 156.00 - 44.00 0.775 34.10

34 1 + 200.00 1.550

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.1 JENIS PEKERJAAN : Galian Biasa

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

50.00 1.959 97.95 35 1 + 250.00 2.368

50.00 2.371 118.53 36 1 + 300.00 2.373

50.00 2.392 119.60 37 1 + 350.00 2.411

50.00 2.106 105.28 38 1 + 400.00 1.800

50.00 1.996 99.80 39 1 + 450.00 2.192

26.00 1.096 28.50 40 1 + 476.00 -

8.00 - - 41 1 + 484.00 -

16.00 1.007 16.10 42 1 + 500.00 2.013

50.00 2.232 111.58 43 1 + 550.00 2.450

50.00 2.546 127.28 44 1 + 600.00 2.641

50.00 2.535 126.73 45 1 + 650.00 2.428

40.00 1.214 48.56 46 1 + 690.00 -

6.00 - - 47 1 + 696.00 -

4.00 0.616 2.46 48 1 + 700.00 1.232

50.00 1.862 93.08 49 1 + 750.00 2.491

50.00 2.215 110.75 50 1 + 800.00 1.939

50.00 1.950 97.48 51 1 + 850.00 1.960

50.00 1.961 98.03 52 1 + 900.00 1.961

50.00 1.862 93.08 53 1 + 950.00 1.762

34.00 0.881 29.95 54 1 + 984.00 -

8.00 - - 55 1 + 992.00 -

8.00 1.097 8.77 56 2 + 000.00 2.193

50.00 1.737 86.85 57 2 + 050.00 1.281

50.00 0.641 32.03 58 2 + 100.00 -

50.00 0.847 42.33 59 2 + 150.00 1.693

50.00 0.997 49.83 60 2 + 200.00 0.300

50.00 0.386 19.28 61 2 + 250.00 0.471

50.00 0.417 20.85 62 2 + 300.00 0.363

50.00 0.487 24.33 63 2 + 350.00 0.610

50.00 0.509 25.45 64 2 + 400.00 0.408

45.00 0.204 9.18 65 2 + 445.00 -

4.00 - - 66 2 + 449.00 -

1.00 - - 67 2 + 450.00 -

50.00 0.467 23.33 68 2 + 500.00 0.933

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.1 JENIS PEKERJAAN : Galian Biasa

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

50.00 0.725 36.23 69 2 + 550.00 0.516

50.00 1.047 52.33 70 2 + 600.00 1.577

10.00 0.789 7.89 71 2 + 610.00 -

4.30 - - 72 2 + 614.30 -

35.70 0.113 4.02 73 2 + 650.00 0.225

50.00 0.844 42.18 74 2 + 700.00 1.462

48.00 0.731 35.09 75 2 + 748.00 -

2.00 0.370 0.74 76 2 + 750.00 0.739

48.00 0.370 17.74 77 2 + 798.00 -

2.00 - - 78 2 + 800.00 -

50.00 1.149 57.43 79 2 + 850.00 2.297

50.00 1.701 85.03 80 2 + 900.00 1.104

50.00 1.795 89.73 81 2 + 950.00 2.485

50.00 1.581 79.03 82 3 + 000.00 0.676

50.00 0.481 24.05 83 3 + 050.00 0.286

50.00 0.531 26.53 84 3 + 100.00 0.775

50.00 0.703 35.13 85 3 + 150.00 0.630

50.00 0.701 35.05 86 3 + 200.00 0.772

50.00 0.732 36.58 87 3 + 250.00 0.691

50.00 1.124 56.20 88 3 + 300.00 1.557

50.00 0.779 38.93 89 3 + 350.00 -

50.00 - - 90 3 + 400.00 -

50.00 - - 91 3 + 450.00 -

50.00 - - 92 3 + 500.00 -

7.00 - - 93 3 + 507.00 -

7.00 - - 94 3 + 514.00 -

36.00 - - 95 3 + 550.00 -

50.00 - - 96 3 + 600.00 -

50.00 0.952 47.60 97 3 + 650.00 1.904

50.00 1.670 83.50 98 3 + 700.00 1.436

50.00 0.718 35.90 99 3 + 750.00 -

50.00 0.275 13.75 100 3 + 800.00 0.550

50.00 0.669 33.45 101 3 + 850.00 0.788

50.00 0.560 27.98

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.1 JENIS PEKERJAAN : Galian Biasa

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

102 3 + 900.00 0.33 50.00 -

103 3 + 950.00 0.924 50.00 0.645 32.25

104 4 + 000.00 0.366 50.00 0.646 32.28

105 4 + 050.00 0.925 5.00 0.463 2.31

106 4 + 055.00 - 8.40 - -

107 4 + 063.40 - 36.60 0.371 13.58

108 4 + 100.00 0.742 50.00 1.061 53.05

109 4 + 150.00 1.380 50.00 0.866 43.28

110 4 + 200.00 0.351 50.00 0.591 29.53

111 4 + 250.00 0.830 50.00 0.753 37.65

112 4 + 300.00 0.676 50.00 1.150 57.48

113 4 + 350.00 1.623 50.00 1.528 76.38

114 4 + 400.00 1.432 50.00 1.411 70.53

115 4 + 450.00 1.389 50.00 1.287 64.33

116 4 + 500.00 1.184 50.00 1.221 61.05

117 4 + 550.00 1.258 50.00 1.039 51.95

118 4 + 600.00 0.820 50.00 0.917 45.85

119 4 + 650.00 1.014 50.00 1.191 59.53

120 4 + 700.00 1.367 50.00 1.306 65.28

121 4 + 750.00 1.244 50.00 1.124 56.20

122 4 + 800.00 1.004 50.00 1.133 56.63

123 4 + 850.00 1.261 50.00 1.116 55.80

124 4 + 900.00 0.971 50.00 0.775 38.75

125 4 + 950.00 0.579 50.00 0.821 41.05

126 5 + 000.00 1.063 50.00 0.955 47.73

127 5 + 050.00 0.846 50.00 0.656 32.80

128 5 + 100.00 0.466 50.00 0.650 32.50

129 5 + 150.00 0.834 50.00 1.047 52.35

130 5 + 200.00 1.260 50.00 1.053 52.65

131 5 + 250.00 0.846 50.00 0.608 30.38

132 5 + 300.00 0.369 50.00 0.510 25.50

133 5 + 350.00 0.651 50.00 0.634 31.70

134 5 + 400.00 0.617 50.00 0.805 40.23

135 5 + 450.00 0.992 50.00 0.938 46.88

136 5 + 500.00 0.883

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.1 JENIS PEKERJAAN : Galian Biasa

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

50.00 0.517 25.85 137 5 + 550.00 0.151

50.00 0.609 30.45 138 5 + 600.00 1.067

50.00 0.742 37.08 139 5 + 650.00 0.416

50.00 0.783 39.13 140 5 + 700.00 1.149

50.00 1.086 54.30 141 5 + 750.00 1.023

50.00 1.409 70.45 142 5 + 800.00 1.795

50.00 1.400 70.00 143 5 + 850.00 1.005

50.00 1.331 66.55 144 5 + 900.00 1.657

50.00 0.829 41.43 145 5 + 950.00 -

50.00 1.060 53.00 146 6 + 000.00 2.120

50.00 1.060 53.00 147 6 + 050.00 -

50.00 - - 148 6 + 100.00 -

50.00 - - 149 6 + 150.00 -

50.00 - - 150 6 + 200.00 -

50.00 0.555 27.75 151 6 + 250.00 1.110

50.00 1.434 71.68 152 6 + 300.00 1.757

50.00 1.721 86.05 153 6 + 350.00 1.685

50.00 1.692 84.60 154 6 + 400.00 1.699

50.00 1.686 84.30 155 6 + 450.00 1.673

50.00 1.175 58.73 156 6 + 500.00 0.676

50.00 1.151 57.55 157 6 + 550.00 1.626

50.00 1.410 70.48 158 6 + 600.00 1.193

50.00 1.077 53.83 159 6 + 650.00 0.960

50.00 1.160 57.98 160 6 + 700.00 1.359

50.00 1.163 58.13 161 6 + 750.00 0.966

50.00 0.649 32.45 162 6 + 800.00 0.332

50.00 0.407 20.33 163 6 + 850.00 0.481

50.00 0.765 38.25 164 6 + 900.00 1.049

50.00 0.886 44.30 165 6 + 950.00 0.723

50.00 1.015 50.75 166 7 + 000.00 1.307

50.00 1.381 69.03 167 7 + 050.00 1.454

50.00 1.355 67.73 168 7 + 100.00 1.255

50.00 1.155 57.75 169 7 + 150.00 1.055

50.00 1.296 64.78 170 7 + 200.00 1.536

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.1 JENIS PEKERJAAN : Galian Biasa

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

50.00 1.426 71.28 171 7 + 250.00 1.315

50.00 1.241 62.03 172 7 + 300.00 1.166

50.00 1.186 59.28 173 7 + 350.00 1.205

50.00 1.031 51.55 174 7 + 400.00 0.857

50.00 0.729 36.45 175 7 + 450.00 0.601

50.00 0.740 36.98 176 7 + 500.00 0.878

50.00 0.934 46.68 177 7 + 550.00 0.989

50.00 0.899 44.95 178 7 + 600.00 0.809

50.00 0.830 41.50 179 7 + 650.00 0.851

30.00 0.426 12.77 180 7 + 680.00 -

20.00 - - 181 7 + 700.00 -

50.00 0.509 25.43 182 7 + 750.00 1.017

50.00 1.021 51.03 183 7 + 800.00 1.024

50.00 1.088 54.38 184 7 + 850.00 1.151

50.00 1.597 79.85 185 7 + 900.00 2.043

50.00 1.646 82.28 186 7 + 950.00 1.248

50.00 1.478 73.90 187 8 + 000.00 1.708

15.00 0.854 12.81 188 8 + 015.00 -

5.00 - - 189 8 + 020.00 -

30.00 0.441 13.23 190 8 + 050.00 0.882

50.00 1.537 76.85 191 8 + 100.00 2.192

50.00 2.253 112.63 192 8 + 150.00 2.313

50.00 2.206 110.28 193 8 + 200.00 2.098

50.00 2.162 108.08 194 8 + 250.00 2.225

50.00 2.176 108.78 195 8 + 300.00 2.126

50.00 2.415 120.75 196 8 + 350.00 2.704

50.00 1.352 67.60 197 8 + 400.00 -

50.00 1.013 50.63 198 8 + 450.00 2.025

50.00 1.925 96.23 199 8 + 500.00 1.824

50.00 2.322 116.10 200 8 + 550.00 2.820

50.00 2.614 130.70 201 8 + 600.00 2.408

50.00 2.115 105.73 202 8 + 650.00 1.821

50.00 1.676 83.78 203 8 + 700.00 1.530

50.00 2.081 104.05 204 8 + 750.00 2.632

50.00 2.464 123.18 205 8 + 800.00 2.295

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 3.1 JENIS PEKERJAAN : Galian Biasa

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

50.00 2.058 102.88 206 8 + 850.00 1.820

50.00 1.222 61.08 207 8 + 900.00 0.623

50.00 0.474 23.68 208 8 + 950.00 0.324

50.00 0.162 8.10 209 9 + 000.00 -

50.00 - -

Jumlah 10,810.92

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

1 0 + 000.0050.00 -

2 0 + 050.00 - 50.00 - -

3 0 + 100.00 - 50.00 - -

4 0 + 150.00 - 50.00 0.323 16.13

5 0 + 200.00 0.645 50.00 0.968 48.38

6 0 + 250.00 1.290 50.00 1.290 64.50

7 0 + 300.00 1.290 50.00 1.290 64.50

8 0 + 350.00 1.290 50.00 1.358 67.88

9 0 + 400.00 1.425 50.00 1.358 67.88

10 0 + 450.00 1.290 50.00 1.290 64.50

11 0 + 500.00 1.290 50.00 1.358 67.88

12 0 + 550.00 1.425 50.00 1.493 74.63

13 0 + 600.00 1.560 50.00 1.425 71.25

14 0 + 650.00 1.290 50.00 1.290 64.50

15 0 + 700.00 1.290 50.00 1.358 67.88

16 0 + 750.00 1.425 50.00 1.358 67.88

17 0 + 800.00 1.290 50.00 1.290 64.50

18 0 + 850.00 1.290 50.00 1.308 65.38

19 0 + 900.00 1.325 50.00 1.308 65.38

20 0 + 950.00 1.290 50.00 1.172 58.58

21 1 + 000.00 1.053 50.00 1.172 58.58

22 1 + 050.00 1.290 50.00 1.358 67.88

23 1 + 100.00 1.425 50.00 0.713 35.63

24 1 + 150.00 - 50.00 0.629 31.43

25 1 + 200.00 1.257 50.00 1.257 62.85

26 1 + 250.00 1.257 50.00 1.361 68.05

27 1 + 300.00 1.465

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

50.00 1.257 62.85 28 1 + 350.00 1.049

50.00 0.787 39.33 29 1 + 400.00 0.524

50.00 0.847 42.33 30 1 + 450.00 1.169

50.00 1.169 58.45 31 1 + 500.00 1.169

50.00 0.585 29.23 32 1 + 550.00 -

50.00 - - 33 1 + 600.00 -

50.00 - - 34 1 + 650.00 -

50.00 0.922 46.10 35 1 + 700.00 1.844

50.00 0.922 46.10 36 1 + 750.00 -

50.00 0.699 34.95 37 1 + 800.00 1.398

50.00 1.344 67.20 38 1 + 850.00 1.290

50.00 1.290 64.50 39 1 + 900.00 1.290

50.00 1.274 63.68 40 1 + 950.00 1.257

50.00 1.447 72.33 41 2 + 000.00 1.636

50.00 1.622 81.10 42 2 + 050.00 1.608

50.00 0.804 40.20 43 2 + 100.00 -

50.00 - - 44 2 + 150.00 -

50.00 - - 45 2 + 200.00 -

50.00 0.369 18.45 46 2 + 250.00 0.738

50.00 0.804 40.20 47 2 + 300.00 0.870

50.00 0.435 21.75 48 2 + 350.00 -

50.00 - - 49 2 + 400.00 -

50.00 - - 50 2 + 450.00 -

50.00 - - 51 2 + 500.00 -

50.00 - - 52 2 + 550.00 -

50.00 0.712 35.58 53 2 + 600.00 1.423

50.00 0.712 35.58 54 2 + 650.00 -

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

54 2 + 650.00 -

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

50.00 0.773 38.65 55 2 + 700.00 1.546

50.00 2.046 102.30 56 2 + 750.00 2.546

50.00 1.273 63.65 57 2 + 800.00 -

50.00 0.732 36.58 58 2 + 850.00 1.463

50.00 0.732 36.58 59 2 + 900.00 -

50.00 - - 60 2 + 950.00 -

50.00 - - 61 3 + 000.00 -

50.00 - - 62 3 + 050.00 -

50.00 1.112 55.58 63 3 + 100.00 2.223

50.00 1.982 99.08 64 3 + 150.00 1.740

50.00 1.674 83.70 65 3 + 200.00 1.608

50.00 1.449 72.45 66 3 + 250.00 1.290

50.00 0.645 32.25 67 3 + 300.00 -

50.00 - - 68 3 + 350.00 -

50.00 - - 69 3 + 400.00 -

50.00 - - 70 3 + 450.00 -

50.00 - - 71 3 + 500.00 -

50.00 - - 72 3 + 550.00 -

50.00 - - 73 3 + 600.00 -

50.00 - - 74 3 + 650.00 -

50.00 0.733 36.63 75 3 + 700.00 1.465

50.00 0.733 36.63 76 3 + 750.00 -

50.00 - - 77 3 + 800.00 -

50.00 - - 78 3 + 850.00 -

50.00 - - 79 3 + 900.00 -

50.00 - 80 3 + 950.00 -

50.00 - - 81 4 + 000.00 -

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

81 4 + 000.0050.00

- - -

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

82 4 + 050.00 - 50.00 0.369 18.45

83 4 + 100.00 0.738 50.00 1.041 52.03

84 4 + 150.00 1.343 50.00 0.672 33.58

85 4 + 200.00 - 50.00 - -

86 4 + 250.00 - 50.00 - -

87 4 + 300.00 - 50.00 0.870 43.50

88 4 + 350.00 1.740 50.00 1.740 87.00

89 4 + 400.00 1.740 50.00 1.861 93.03

90 4 + 450.00 1.981 50.00 1.795 89.73

91 4 + 500.00 1.608 50.00 2.032 101.58

92 4 + 550.00 2.455 50.00 1.228 61.38

93 4 + 600.00 - 50.00 - -

94 4 + 650.00 - 50.00 - -

95 4 + 700.00 - 50.00 - -

96 4 + 750.00 - 50.00 - -

97 4 + 800.00 - 50.00 - -

98 4 + 850.00 - 50.00 - -

99 4 + 900.00 - 50.00 - -

100 4 + 950.00 - 50.00 - -

101 5 + 000.00 - 50.00 - -

102 5 + 050.00 - 50.00 - -

103 5 + 100.00 - 50.00 - -

104 5 + 150.00 - 50.00 - -

105 5 + 200.00 - 50.00 - -

106 5 + 250.00 - 50.00 - -

107 5 + 300.00 - 50.00 0.674 33.70

108 5 + 350.00 1.348 50.00 1.232 61.58

109 5 + 400.00 1.115

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

109 5 + 400.00 1.115

50.00 0.947 47.33 110 5 + 450.00 0.778

50.00 0.389 19.45 111 5 + 500.00 -

50.00 - - 112 5 + 550.00 -

50.00 0.435 21.75 113 5 + 600.00 0.870

50.00 0.435 21.75 114 5 + 650.00 -

50.00 - - 115 5 + 700.00 -

50.00 - - 116 5 + 750.00 -

50.00 - - 117 5 + 800.00 -

50.00 - - 118 5 + 850.00 -

50.00 - - 119 5 + 900.00 -

50.00 - - 120 5 + 950.00 -

50.00 - - 121 6 + 000.00 -

50.00 - - 122 6 + 050.00 -

50.00 - - 123 6 + 100.00 -

50.00 - - 124 6 + 150.00 -

50.00 - - 125 6 + 200.00 -

50.00 - - 126 6 + 250.00 -

50.00 0.479 23.93 127 6 + 300.00 0.957

50.00 0.848 42.38 128 6 + 350.00 0.738

50.00 0.369 18.45 129 6 + 400.00 -

50.00 - - 130 6 + 450.00 -

50.00 - - 131 6 + 500.00 -

50.00 - - 132 6 + 550.00 -

50.00 - - 133 6 + 600.00 -

50.00 - - 134 6 + 650.00 -

50.00 - - 135 6 + 700.00 -

50.00 - -

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

136 6 + 750.0050.00

- - -

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

50.00 - - 137 6 + 800.00 -

50.00 - - 138 6 + 850.00 -

50.00 - - 139 6 + 900.00 -

50.00 - - 140 6 + 950.00 -

50.00 - - 141 7 + 000.00 -

50.00 - - 142 7 + 050.00 -

50.00 - - 143 7 + 100.00 -

50.00 - - 144 7 + 150.00 -

50.00 - - 145 7 + 200.00 -

50.00 - - 146 7 + 250.00 -

50.00 0.802 40.08 147 7 + 300.00 1.603

50.00 0.802 40.08 148 7 + 350.00 -

50.00 - - 149 7 + 400.00 -

50.00 - - 150 7 + 450.00 -

50.00 - - 151 7 + 500.00 -

50.00 - - 152 7 + 550.00 -

50.00 - - 153 7 + 600.00 -

50.00 - - 154 7 + 650.00 -

50.00 - - 155 7 + 700.00 -

50.00 - - 156 7 + 750.00 -

50.00 0.734 36.70 157 7 + 800.00 1.47

50.00 0.734 36.70 158 7 + 850.00 -

50.00 0.674 33.70 159 7 + 900.00 1.348

50.00 0.674 33.70 160 7 + 950.00 -

50.00 1.038 51.90 161 8 + 000.00 2.076

50.00 1.407 70.35 162 8 + 050.00 0.738

50.00 0.369 18.45 163 8 + 100.00 -

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

163 8 + 100.00 -

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 7.9 JENIS PEKERJAAN : Pasangan Batu

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

50.00 - - 164 8 + 150.00 -

50.00 - - 165 8 + 200.00 -

50.00 - - 166 8 + 250.00 -

50.00 - - 167 8 + 300.00 -

50.00 - - 168 8 + 350.00 -

50.00 - - 169 8 + 400.00 -

50.00 - - 170 8 + 450.00 -

50.00 - - 171 8 + 500.00 -

50.00 - - 172 8 + 550.00 -

50.00 - - 173 8 + 600.00 -

50.00 - - 174 8 + 650.00 -

50.00 - - 175 8 + 700.00 -

50.00 - - 176 8 + 750.00 -

50.00 - - 177 8 + 800.00 -

50.00 - - 178 8 + 850.00 -

50.00 - - 179 8 + 900.00 -

50.00 - - 180 8 + 950.00 -

50.00 - - 181 9 + 000.00 -

50.00

Jumlah 4,212.10

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 2.2 JENIS PEKERJAAN : Pasangan Mortar

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

1 0 + 000.0050.00 -

2 0 + 050.0050.00 - -

3 0 + 100.0050.00 - -

4 0 + 150.0050.00 - -

5 0 + 200.0050.00 - -

6 0 + 250.0050.00 - -

7 0 + 300.0050.00 - -

8 0 + 350.0050.00 - -

9 0 + 400.0050.00 - -

10 0 + 450.0050.00 - -

11 0 + 500.0050.00 - -

12 0 + 550.0050.00 0.525 26.25

13 0 + 600.00 1.050 50.00 0.525 26.25

14 0 + 650.0050.00 - -

15 0 + 700.0050.00 - -

16 0 + 750.0050.00 - -

17 0 + 800.0050.00 - -

18 0 + 850.0050.00 - -

19 0 + 900.0050.00 - -

20 0 + 950.0050.00 - -

21 1 + 000.0050.00 - -

22 1 + 050.0050.00 - -

23 1 + 100.0050.00 - -

24 1 + 150.0050.00 - -

25 1 + 200.0050.00 - -

26 1 + 250.0050.00 - -

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 2.2 JENIS PEKERJAAN : Pasangan Mortar

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

27 1 + 300.0050.00 - -

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 2.2 JENIS PEKERJAAN : Pasangan Mortar

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

27 1 + 300.0050.00 - -

28 1 + 350.0050.00 - -

29 1 + 400.0050.00 - -

30 1 + 450.0050.00 - -

31 1 + 500.0050.00 - -

32 1 + 550.0050.00 - -

33 1 + 600.0050.00 - -

34 1 + 650.0050.00 - -

35 1 + 700.0050.00 - -

36 1 + 750.0050.00 - -

37 1 + 800.0050.00 - -

38 1 + 850.0050.00 - -

39 1 + 900.0050.00 - -

40 1 + 950.0050.00 - -

41 2 + 000.0050.00 - -

42 2 + 050.0050.00 - -

43 2 + 100.0050.00 - -

44 2 + 150.0050.00 - -

45 2 + 200.0050.00 - -

46 2 + 250.0050.00 - -

47 2 + 300.0050.00 - -

48 2 + 350.0050.00 - -

49 2 + 400.0050.00 - -

50 2 + 450.0050.00 - -

51 2 + 500.0050.00 - -

52 2 + 550.0050.00 - -

53 2 + 600.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 2.2 JENIS PEKERJAAN : Pasangan Mortar

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

53 2 + 600.0050.00 - -

54 2 + 650.0050.00 - -

55 2 + 700.0050.00 - -

56 2 + 750.0050.00 - -

57 2 + 800.0050.00 - -

58 2 + 850.0050.00 - -

59 2 + 900.0050.00 - -

60 2 + 950.0050.00 - -

61 3 + 000.0050.00 - -

62 3 + 050.0050.00 - -

63 3 + 100.0050.00 - -

64 3 + 150.0050.00 - -

65 3 + 200.0050.00 - -

66 3 + 250.0050.00 - -

67 3 + 300.0050.00 - -

68 3 + 350.0050.00 - -

69 3 + 400.0050.00 - -

70 3 + 450.0050.00 - -

71 3 + 500.0050.00 - -

72 3 + 550.0050.00 - -

73 3 + 600.0050.00 - -

74 3 + 650.0050.00 - -

75 3 + 700.0050.00 - -

76 3 + 750.0050.00 - -

77 3 + 800.0050.00 - -

78 3 + 850.0050.00 - -

79 3 + 900.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 2.2 JENIS PEKERJAAN : Pasangan Mortar

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

79 3 + 900.0050.00 -

80 3 + 950.0050.00 - -

81 4 + 000.0050.00 - -

82 4 + 050.0050.00 - -

83 4 + 100.0050.00 - -

84 4 + 150.0050.00 - -

85 4 + 200.0050.00 - -

86 4 + 250.0050.00 - -

87 4 + 300.0050.00 - -

88 4 + 350.0050.00 - -

89 4 + 400.0050.00 - -

90 4 + 450.0050.00 0.525 26.25

91 4 + 500.00 1.050 50.00 0.525 26.25

92 4 + 550.0050.00 - -

93 4 + 600.0050.00 - -

94 4 + 650.0050.00 - -

95 4 + 700.0050.00 - -

96 4 + 750.0050.00 - -

97 4 + 800.0050.00 - -

98 4 + 850.0050.00 - -

99 4 + 900.0050.00 - -

100 4 + 950.0050.00 - -

101 5 + 000.0050.00 - -

102 5 + 050.0050.00 - -

103 5 + 100.0050.00 - -

104 5 + 150.0050.00 - -

105 5 + 200.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 2.2 JENIS PEKERJAAN : Pasangan Mortar

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

105 5 + 200.0050.00 - -

106 5 + 250.0050.00 - -

107 5 + 300.0050.00 - -

108 5 + 350.0050.00 - -

109 5 + 400.0050.00 - -

110 5 + 450.0050.00 - -

111 5 + 500.0050.00 - -

112 5 + 550.0050.00 - -

113 5 + 600.0050.00 - -

114 5 + 650.0050.00 - -

115 5 + 700.0050.00 - -

116 5 + 750.0050.00 - -

117 5 + 800.0050.00 - -

118 5 + 850.0050.00 - -

119 5 + 900.0050.00 - -

120 5 + 950.0050.00 - -

121 6 + 000.0050.00 - -

122 6 + 050.0050.00 - -

123 6 + 100.0050.00 - -

124 6 + 150.0050.00 - -

125 6 + 200.0050.00 - -

126 6 + 250.0050.00 - -

127 6 + 300.0050.00 - -

128 6 + 350.0050.00 - -

129 6 + 400.0050.00 - -

130 6 + 450.0050.00 - -

131 6 + 500.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 2.2 JENIS PEKERJAAN : Pasangan Mortar

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

131 6 + 500.0050.00 - -

132 6 + 550.0050.00 - -

133 6 + 600.0050.00 - -

134 6 + 650.0050.00 - -

135 6 + 700.0050.00 - -

136 6 + 750.0050.00 - -

137 6 + 800.0050.00 - -

138 6 + 850.0050.00 - -

139 6 + 900.0050.00 - -

140 6 + 950.0050.00 - -

141 7 + 000.0050.00 - -

142 7 + 050.0050.00 - -

143 7 + 100.0050.00 - -

144 7 + 150.0050.00 - -

145 7 + 200.0050.00 - -

146 7 + 250.0050.00 - -

147 7 + 300.0050.00 - -

148 7 + 350.0050.00 - -

149 7 + 400.0050.00 - -

150 7 + 450.0050.00 - -

151 7 + 500.0050.00 - -

152 7 + 550.0050.00 - -

153 7 + 600.0050.00 - -

154 7 + 650.0050.00 - -

155 7 + 700.0050.00 - -

156 7 + 750.0050.00

- -

157 7 + 800.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 2.2 JENIS PEKERJAAN : Pasangan Mortar

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

157 7 + 800.0050.00 -

158 7 + 850.0050.00 - -

159 7 + 900.0050.00 - -

160 7 + 950.0050.00 - -

161 8 + 000.0050.00 - -

162 8 + 050.0050.00 - -

163 8 + 100.0050.00 - -

164 8 + 150.0050.00 - -

165 8 + 200.0050.00 - -

166 8 + 250.0050.00 - -

167 8 + 300.0050.00 - -

168 8 + 350.0050.00 0.525 26.25

169 8 + 400.00 1.050 50.00 0.525 26.25

170 8 + 450.0050.00 - -

171 8 + 500.0050.00 - -

172 8 + 550.0050.00 - -

173 8 + 600.0050.00 - -

174 8 + 650.0050.00 - -

175 8 + 700.0050.00 - -

176 8 + 750.0050.00 - -

177 8 + 800.0050.00 - -

178 8 + 850.0050.00 - -

179 8 + 900.0050.00 - -

180 8 + 950.0050.00 - -

181 9 + 000.0050.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 2.1 JENIS PEKERJAAN : Galian Untuk Drainase, Saluran

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

1 0 + 000.0050.00 -

2 0 + 050.00 0.873 50.00 1.277 63.87

3 0 + 100.00 1.682 50.00 0.841 42.05

4 0 + 150.0050.00 - -

5 0 + 200.0050.00 - -

6 0 + 250.0050.00 - -

7 0 + 300.0050.00 - -

8 0 + 350.0050.00 - -

9 0 + 400.0050.00 - -

10 0 + 450.0050.00 - -

11 0 + 500.0050.00 0.525 26.25

12 0 + 550.00 1.050 50.00 0.525 26.25

13 0 + 600.0050.00 - -

14 0 + 650.0050.00 - -

15 0 + 700.0050.00 - -

16 0 + 750.0050.00 - -

17 0 + 800.0050.00 - -

18 0 + 850.0050.00 - -

19 0 + 900.0050.00 - -

20 0 + 950.0050.00 - -

21 1 + 000.0050.00 - -

22 1 + 050.0050.00 - -

23 1 + 100.0050.00 - -

24 1 + 150.0050.00 - -

25 1 + 200.0050.00 - -

26 1 + 250.0050.00 - -

27 1 + 300.0050.00 - -

28 1 + 350.0050.00 - -

29 1 + 400.0050.00 - -

30 1 + 450.0050.00 - -

31 1 + 500.0050.00 - -

32 1 + 550.0050.00 - -

33 1 + 600.0050.00 - -

34 1 + 650.0050.00 - -

35 1 + 700.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 2.1 JENIS PEKERJAAN : Galian Untuk Drainase, Saluran

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

50.00 - - 36 1 + 750.00

50.00 - - 37 1 + 800.00

50.00 - - 38 1 + 850.00

50.00 - - 39 1 + 900.00

50.00 - - 40 1 + 950.00

50.00 - - 41 2 + 000.00

50.00 - - 42 2 + 050.00

50.00 - - 43 2 + 100.00

50.00 0.421 21.04 44 2 + 150.00 0.842

50.00 0.421 21.04 45 2 + 200.00

50.00 - - 46 2 + 250.00

50.00 - - 47 2 + 300.00

50.00 - - 48 2 + 350.00

50.00 - - 49 2 + 400.00

50.00 - - 50 2 + 450.00

50.00 - - 51 2 + 500.00

50.00 - - 52 2 + 550.00

50.00 - - 53 2 + 600.00

50.00 - - 54 2 + 650.00

50.00 - - 55 2 + 700.00

50.00 - - 56 2 + 750.00

50.00 - - 57 2 + 800.00

50.00 - - 58 2 + 850.00

50.00 - - 59 2 + 900.00

50.00 - - 60 2 + 950.00

50.00 - - 61 3 + 000.00

50.00 - - 62 3 + 050.00

50.00 - - 63 3 + 100.00

50.00 - - 64 3 + 150.00

50.00 - - 65 3 + 200.00

50.00 0.509 25.45 66 3 + 250.00 1.018

50.00 0.509 25.45 67 3 + 300.00

50.00 - - 68 3 + 350.00

50.00 - - 69 3 + 400.00

50.00 - - 70 3 + 450.00

50.00 - - 71 3 + 500.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 2.1 JENIS PEKERJAAN : Galian Untuk Drainase, Saluran

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

50.00 - - 72 3 + 550.00

50.00 - - 73 3 + 600.00

50.00 - - 74 3 + 650.00

50.00 - - 75 3 + 700.00

50.00 - - 76 3 + 750.00

50.00 - - 77 3 + 800.00

50.00 - - 78 3 + 850.00

50.00 - - 79 3 + 900.00

50.00 - 80 3 + 950.00

50.00 - - 81 4 + 000.00

50.00 - - 82 4 + 050.00

50.00 - - 83 4 + 100.00

50.00 - - 84 4 + 150.00

50.00 - - 85 4 + 200.00

50.00 - - 86 4 + 250.00

50.00 - - 87 4 + 300.00

50.00 - - 88 4 + 350.00

50.00 - - 89 4 + 400.00

50.00 0.525 26.25 90 4 + 450.00 1.050

50.00 0.525 26.25 91 4 + 500.00

50.00 - - 92 4 + 550.00

50.00 - - 93 4 + 600.00

50.00 - - 94 4 + 650.00

50.00 - - 95 4 + 700.00

50.00 - - 96 4 + 750.00

50.00 - - 97 4 + 800.00

50.00 - - 98 4 + 850.00

50.00 - - 99 4 + 900.00

50.00 - - 100 4 + 950.00

50.00 - - 101 5 + 000.00

50.00 - - 102 5 + 050.00

50.00 - - 103 5 + 100.00

50.00 - - 104 5 + 150.00

50.00 - - 105 5 + 200.00

50.00 - - 106 5 + 250.00

50.00 - - 107 5 + 300.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 2.1 JENIS PEKERJAAN : Galian Untuk Drainase, Saluran

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

50.00 - - 108 5 + 350.00

50.00 - - 109 5 + 400.00

50.00 - - 110 5 + 450.00

50.00 - - 111 5 + 500.00

50.00 - - 112 5 + 550.00

50.00 - - 113 5 + 600.00

50.00 - - 114 5 + 650.00

50.00 - - 115 5 + 700.00

50.00 - - 116 5 + 750.00

50.00 - - 117 5 + 800.00

50.00 - - 118 5 + 850.00

50.00 - - 119 5 + 900.00

50.00 - - 120 5 + 950.00

50.00 - - 121 6 + 000.00

50.00 - - 122 6 + 050.00

50.00 - - 123 6 + 100.00

50.00 - - 124 6 + 150.00

50.00 - - 125 6 + 200.00

50.00 - - 126 6 + 250.00

50.00 - - 127 6 + 300.00

50.00 - - 128 6 + 350.00

50.00 - - 129 6 + 400.00

50.00 - - 130 6 + 450.00

50.00 - - 131 6 + 500.00

50.00 - - 132 6 + 550.00

50.00 - - 133 6 + 600.00

50.00 - - 134 6 + 650.00

50.00 - - 135 6 + 700.00

50.00 - - 136 6 + 750.00

50.00 - - 137 6 + 800.00

50.00 - - 138 6 + 850.00

50.00 - - 139 6 + 900.00

50.00 - - 140 6 + 950.00

50.00 - - 141 7 + 000.00

50.00 - - 142 7 + 050.00

50.00 - - 143 7 + 100.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 2.1 JENIS PEKERJAAN : Galian Untuk Drainase, Saluran

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

50.00 - - 144 7 + 150.00

50.00 - - 145 7 + 200.00

50.00 - - 146 7 + 250.00

50.00 - - 147 7 + 300.00

50.00 - - 148 7 + 350.00

50.00 - - 149 7 + 400.00

50.00 - - 150 7 + 450.00

50.00 - - 151 7 + 500.00

50.00 - - 152 7 + 550.00

50.00 - - 153 7 + 600.00

50.00 - - 154 7 + 650.00

50.00 - - 155 7 + 700.00

50.00 - - 156 7 + 750.00

50.00 - - 157 7 + 800.00

50.00 - 158 7 + 850.00

50.00 - - 159 7 + 900.00

50.00 - - 160 7 + 950.00

50.00 - - 161 8 + 000.00

50.00 - - 162 8 + 050.00

50.00 - - 163 8 + 100.00

50.00 - - 164 8 + 150.00

50.00 - - 165 8 + 200.00

50.00 - - 166 8 + 250.00

50.00 - - 167 8 + 300.00

50.00 - - 168 8 + 350.00 -

50.00 0.416 20.81 169 8 + 400.00 0.832

50.00 0.696 34.81 170 8 + 450.00 0.560

50.00 1.186 59.32 171 8 + 500.00 1.813

50.00 1.468 73.39 172 8 + 550.00 1.123

50.00 0.562 28.08 173 8 + 600.00 -

50.00 0.656 32.79 174 8 + 650.00 1.312

50.00 1.256 62.80 175 8 + 700.00 1.200

50.00 1.302 65.08 176 8 + 750.00 1.403

50.00 1.173 58.67 177 8 + 800.00 0.944

50.00 0.944 47.18 178 8 + 850.00 0.944

50.00 0.472 23.59 179 8 + 900.00

50.00 - - 180 8 + 950.00

50.00 - - 181 9 + 000.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 2.1 JENIS PEKERJAAN : Galian Untuk Drainase, Saluran

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG AREA RATA2 VOLUME

KET( M ) ( M2 ) ( M2 ) ( M3 )

181 9 + 000.00

Jumlah 810.40

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 4.2.2

JENIS PEKERJAAN : Lapis Pondasi Aggregat Klas B ( Bahu Jalan )

SATUAN PEMBAYARAN : M3

NO STATION

PANJANG LEBAR KIRI LEBAR KANAN TOTAL TEBAL AREA VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

1 0 + 000.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420 50.00 0.42 21.00

2 0 + 050.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420 50.00 0.42 21.00

3 0 + 100.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420 19.00 0.21 3.99

4 0 + 119.00 - - - - - - - - - 9.00 - -

5 0 + 128.00 - - - - - - - - - 22.00 0.21 4.62

6 0 + 150.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420 50.00 0.41 20.50

7 0 + 200.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

8 0 + 250.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

9 0 + 300.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 36.00 0.20 7.20

10 0 + 336.00 - - - - - - - - - 7.00 - -

11 0 + 343.00 - - - - - - - - - 7.00 0.20 1.40

12 0 + 350.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 2.00 0.20 0.40

13 0 + 352.00 - - - - - - - - - 12.00 - -

14 0 + 364.00 - - - - - - - - - 36.00 0.20 7.20

15 0 + 400.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

16 0 + 450.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

17 0 + 500.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

18 0 + 550.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

19 0 + 600.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

20 0 + 650.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

21 0 + 700.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 25.00 0.20 5.00

22 0 + 725.00 - - - - - - - - - 5.00 - -

23 0 + 730.00 - - - - - - - - - 20.00 0.20 4.00

24 0 + 750.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

25 0 + 800.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

26 0 + 850.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

27 0 + 900.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

28 0 + 950.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

29 1 + 000.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

30 1 + 050.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

31 1 + 100.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.20 10.00

32 1 + 150.00 - - - - - - - - - 6.00 - -

33 1 + 156.00 - - - - - - - - - 44.00 0.20 8.80

34 1 + 200.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

35 1 + 250.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

36 1 + 300.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

37 1 + 350.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

38 1 + 400.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 50.00 0.40 20.00

39 1 + 450.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400 26.00 0.20 5.20

40 1 + 476.00 - - - - - - - - -

AREA RATA2

ATAS ( M )

BAWAH ( M

)

RATA -RATA ( M )

ATAS ( M )

BAWAH ( M

)

RATA -RATA ( M )

RATA2 LEBAR KIRI&KANAN

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 4.2.2

JENIS PEKERJAAN : Lapis Pondasi Aggregat Klas B ( Bahu Jalan )

SATUAN PEMBAYARAN : M3

NO STATION

PANJANG LEBAR KIRI LEBAR KANAN TOTAL TEBAL AREA VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

AREA RATA2

ATAS ( M )

BAWAH ( M

)

RATA -RATA ( M )

ATAS ( M )

BAWAH ( M

)

RATA -RATA ( M )

RATA2 LEBAR KIRI&KANAN

8.00 - - 41 1 + 484.00 - - - - - - - - -

16.00 0.20 3.20 42 1 + 500.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.41 20.50 43 1 + 550.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 44 1 + 600.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 45 1 + 650.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

40.00 0.21 8.40 46 1 + 690.00 - - - - - - - - -

6.00 - - 47 1 + 696.00 - - - - - - - - -

4.00 0.21 0.84 48 1 + 700.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.41 20.50 49 1 + 750.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.40 20.00 50 1 + 800.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.40 20.00 51 1 + 850.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.40 20.00 52 1 + 900.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.40 20.00 53 1 + 950.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

34.00 0.20 6.80 54 1 + 984.00 - - - - - - - - -

8.00 - - 55 1 + 992.00 - - - - - - - - -

8.00 0.20 1.60 56 2 + 000.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.40 20.00 57 2 + 050.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.40 20.00 58 2 + 100.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.41 20.50 59 2 + 150.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 60 2 + 200.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 61 2 + 250.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 62 2 + 300.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 63 2 + 350.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 64 2 + 400.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

45.00 0.21 9.45 65 2 + 445.00 - - - - - - - - -

4.00 - - 66 2 + 449.00 - - - - - - - - -

1.00 0.21 0.21 67 2 + 450.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 68 2 + 500.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 69 2 + 550.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 70 2 + 600.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

10.00 0.21 2.10 71 2 + 610.00 - - - - - - - - -

4.30 - - 72 2 + 614.30 - - - - - - - - -

35.70 0.21 7.50 73 2 + 650.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 74 2 + 700.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

48.00 0.21 10.08 75 2 + 748.00 - - - - - - - - -

2.00 - - 76 2 + 750.00 - - - - - - - - -

48.00 - - 77 2 + 798.00 - - - - - - - - -

2.00 0.21 0.42 78 2 + 800.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 79 2 + 850.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 80 2 + 900.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 4.2.2

JENIS PEKERJAAN : Lapis Pondasi Aggregat Klas B ( Bahu Jalan )

SATUAN PEMBAYARAN : M3

NO STATION

PANJANG LEBAR KIRI LEBAR KANAN TOTAL TEBAL AREA VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

AREA RATA2

ATAS ( M )

BAWAH ( M

)

RATA -RATA ( M )

ATAS ( M )

BAWAH ( M

)

RATA -RATA ( M )

RATA2 LEBAR KIRI&KANAN

50.00 0.42 21.00 81 2 + 950.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 82 3 + 000.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 83 3 + 050.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 84 3 + 100.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.41 20.50 85 3 + 150.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.40 20.00 86 3 + 200.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.40 20.00 87 3 + 250.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.41 20.50 88 3 + 300.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 89 3 + 350.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 90 3 + 400.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 91 3 + 450.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 92 3 + 500.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

7.00 0.21 1.47 93 3 + 507.00 - - - - - - - - -

7.00 - - 94 3 + 514.00 - - - - - - - - -

36.00 0.21 7.56 95 3 + 550.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 96 3 + 600.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 97 3 + 650.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 98 3 + 700.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.41 20.50 99 3 + 750.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.40 20.00 100 3 + 800.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.41 20.50 101 3 + 850.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 102 3 + 900.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 103 3 + 950.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 104 4 + 000.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 105 4 + 050.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

5.00 0.21 1.05 106 4 + 055.00 - - - - - - - - -

8.40 - - 107 4 + 063.40 - - - - - - - - -

36.60 0.20 7.32 108 4 + 100.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.40 20.00 109 4 + 150.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.41 20.50 110 4 + 200.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 111 4 + 250.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 112 4 + 300.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.41 20.50 113 4 + 350.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.40 20.00 114 4 + 400.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.40 20.00 115 4 + 450.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.41 20.50 116 4 + 500.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 117 4 + 550.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 118 4 + 600.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 119 4 + 650.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 120 4 + 700.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 4.2.2

JENIS PEKERJAAN : Lapis Pondasi Aggregat Klas B ( Bahu Jalan )

SATUAN PEMBAYARAN : M3

NO STATION

PANJANG LEBAR KIRI LEBAR KANAN TOTAL TEBAL AREA VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

AREA RATA2

ATAS ( M )

BAWAH ( M

)

RATA -RATA ( M )

ATAS ( M )

BAWAH ( M

)

RATA -RATA ( M )

RATA2 LEBAR KIRI&KANAN

50.00 0.42 21.00 121 4 + 750.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 122 4 + 800.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 123 4 + 850.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 124 4 + 900.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 125 4 + 950.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 126 5 + 000.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 127 5 + 050.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 128 5 + 100.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 129 5 + 150.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.41 20.50 130 5 + 200.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.41 20.50 131 5 + 250.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 132 5 + 300.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 133 5 + 350.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 134 5 + 400.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 135 5 + 450.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 136 5 + 500.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 137 5 + 550.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 138 5 + 600.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.41 20.50 139 5 + 650.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.41 20.50 140 5 + 700.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 141 5 + 750.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 142 5 + 800.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 143 5 + 850.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 144 5 + 900.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 145 5 + 950.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 146 6 + 000.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 147 6 + 050.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 148 6 + 100.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 149 6 + 150.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 150 6 + 200.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 151 6 + 250.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.41 20.50 152 6 + 300.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.40 20.00 153 6 + 350.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.41 20.50 154 6 + 400.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 155 6 + 450.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 156 6 + 500.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00157 6 + 550.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 158 6 + 600.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 159 6 + 650.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 160 6 + 700.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 4.2.2

JENIS PEKERJAAN : Lapis Pondasi Aggregat Klas B ( Bahu Jalan )

SATUAN PEMBAYARAN : M3

NO STATION

PANJANG LEBAR KIRI LEBAR KANAN TOTAL TEBAL AREA VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

AREA RATA2

ATAS ( M )

BAWAH ( M

)

RATA -RATA ( M )

ATAS ( M )

BAWAH ( M

)

RATA -RATA ( M )

RATA2 LEBAR KIRI&KANAN

50.00 0.42 21.00 161 6 + 750.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 162 6 + 800.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 163 6 + 850.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 164 6 + 900.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 165 6 + 950.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 166 7 + 000.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 167 7 + 050.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 168 7 + 100.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 169 7 + 150.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 170 7 + 200.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 171 7 + 250.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.41 20.50 172 7 + 300.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.41 20.50 173 7 + 350.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 174 7 + 400.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 175 7 + 450.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 176 7 + 500.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 177 7 + 550.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 178 7 + 600.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 179 7 + 650.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

30.00 0.21 6.30 180 7 + 680.00 - - - - - - - - -

20.00 - - 181 7 + 700.00 - - - - - - - - -

50.00 0.21 10.50 182 7 + 750.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.41 20.50 183 7 + 800.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.41 20.50 184 7 + 850.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.41 20.50 185 7 + 900.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

50.00 0.41 20.50 186 7 + 950.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.41 20.50 187 8 + 000.00 1.000 1.000 1.000 1.000 1.000 1.000 2.000 0.200 0.400

15.00 0.20 3.00 188 8 + 015.00 - - - - - - - - -

5.00 - - 189 8 + 020.00 - - - - - - - - -

30.00 0.21 6.30 190 8 + 050.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 191 8 + 100.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 192 8 + 150.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 193 8 + 200.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 194 8 + 250.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 195 8 + 300.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 196 8 + 350.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 197 8 + 400.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 198 8 + 450.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 199 8 + 500.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 200 8 + 550.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 4.2.2

JENIS PEKERJAAN : Lapis Pondasi Aggregat Klas B ( Bahu Jalan )

SATUAN PEMBAYARAN : M3

NO STATION

PANJANG LEBAR KIRI LEBAR KANAN TOTAL TEBAL AREA VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

AREA RATA2

ATAS ( M )

BAWAH ( M

)

RATA -RATA ( M )

ATAS ( M )

BAWAH ( M

)

RATA -RATA ( M )

RATA2 LEBAR KIRI&KANAN

50.00 0.42 21.00 201 8 + 600.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 202 8 + 650.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 203 8 + 700.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 204 8 + 750.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 205 8 + 800.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 206 8 + 850.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 207 8 + 900.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.42 21.00 208 8 + 950.00 1.000 1.100 1.050 1.000 1.100 1.050 2.100 0.200 0.420

50.00 0.21 10.50 209 9 + 000.00 - 0.200 -

JUMLAH 1,540.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.3.5a

JENIS PEKERJAAN : Laston- Lapis Aus (AC-WC)

SATUAN PEMBAYARAN : M2

NO STATIONPANJANG LEBAR VOLUME

KET( M ) ( M2 )

1 0 + 000.00 6.00 6.000 6.000 50.00 300.00

2 0 + 050.00 6.00 6.000 6.000 50.00 300.00

3 0 + 100.00 6.00 6.00 6.000 19.00 300.00

4 0 + 119.00 4.00 4.000 4.000 9.00 200.00

5 0 + 128.00 4.00 4.000 4.000 22.00 200.00

6 0 + 150.00 6.00 6.000 6.000 50.00 300.00

7 0 + 200.00 6.00 6.000 6.000 50.00 300.00

8 0 + 250.00 6.00 6.000 6.000 50.00 300.00

9 0 + 300.00 6.00 6.000 6.000 36.00 300.00

10 0 + 336.00 4.00 4.000 4.000 7.00 200.00

11 0 + 343.00 4.00 4.000 4.000 7.00 200.00

12 0 + 350.00 6.00 6.000 6.000 2.00 300.00

13 0 + 352.00 4.00 4.000 4.000 12.00 200.00

14 0 + 364.00 4.00 4.000 4.000 36.00 200.00

15 0 + 400.00 6.00 6.000 6.000 50.00 300.00

16 0 + 450.00 6.00 6.000 6.000 50.00 300.00

17 0 + 500.00 6.00 6.000 6.000 50.00 300.00

18 0 + 550.00 6.00 6.000 6.000 50.00 300.00

19 0 + 600.00 6.00 6.000 6.000 50.00 300.00

20 0 + 650.00 6.00 6.000 6.000 50.00 300.00

21 0 + 700.00 6.00 6.000 6.000 25.00 300.00

22 0 + 725.00 4.00 4.000 4.000 5.00 200.00

23 0 + 730.00 4.00 4.000 4.000 20.00 200.00

24 0 + 750.00 6.00 6.000 6.000 50.00 300.00

25 0 + 800.00 6.00 6.000 6.000 50.00 300.00

26 0 + 850.00 6.00 6.000 6.000 50.00 300.00

27 0 + 900.00 6.00 6.000 6.000 50.00 300.00

28 0 + 950.00 6.00 6.000 6.000 50.00 300.00

29 1 + 000.00 6.00 6.000 6.000 50.00 300.00

30 1 + 050.00 6.00 6.000 6.000 50.00 300.00

31 1 + 100.00 6.00 6.000 6.000 50.00 300.00

32 1 + 150.00 4.00 4.000 4.000 6.00 200.00

ATAS ( M )

BAWAH ( M )

RATA -RATA ( M )

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.3.5a

JENIS PEKERJAAN : Laston- Lapis Aus (AC-WC)

SATUAN PEMBAYARAN : M2

NO STATIONPANJANG LEBAR VOLUME

KET( M ) ( M2 ) ATAS

( M ) BAWAH

( M ) RATA -RATA

( M )

33 1 + 156.00 4.00 4.000 4.000 44.00 200.00

34 1 + 200.00 6.00 6.000 6.000 50.00 300.00

35 1 + 250.00 6.00 6.000 6.000 50.00 300.00

36 1 + 300.00 6.00 6.000 6.000 50.00 300.00

37 1 + 350.00 6.00 6.000 6.000 50.00 300.00

38 1 + 400.00 6.00 6.000 6.000 50.00 300.00

39 1 + 450.00 6.00 6.000 6.000 26.00 300.00

40 1 + 476.00 4.00 4.000 4.000 8.00 200.00

41 1 + 484.00 4.00 4.000 4.000 16.00 200.00

42 1 + 500.00 6.00 6.000 6.000 50.00 300.00

43 1 + 550.00 6.00 6.000 6.000 50.00 300.00

44 1 + 600.00 6.00 6.000 6.000 50.00 300.00

45 1 + 650.00 6.00 6.000 6.000 40.00 300.00

46 1 + 690.00 4.00 4.000 4.000 6.00 200.00

47 1 + 696.00 4.00 4.000 4.000 4.00 200.00

48 1 + 700.00 6.00 6.000 6.000 50.00 300.00

49 1 + 750.00 6.00 6.000 6.000 50.00 300.00

50 1 + 800.00 6.00 6.000 6.000 50.00 300.00

51 1 + 850.00 6.00 6.000 6.000 50.00 300.00

52 1 + 900.00 6.00 6.000 6.000 50.00 300.00

53 1 + 950.00 6.00 6.000 6.000 34.00 300.00

54 1 + 984.00 4.00 4.000 4.000 8.00 200.00

55 1 + 992.00 4.00 4.000 4.000 8.00 200.00

56 2 + 000.00 5.00 6.000 5.500 50.00 275.00

57 2 + 050.00 5.00 6.000 5.500 50.00 275.00

58 2 + 100.00 5.00 6.000 5.500 50.00 275.00

59 2 + 150.00 5.00 6.000 5.500 50.00 275.00

60 2 + 200.00 5.00 6.000 5.500 50.00 275.00

61 2 + 250.00 5.00 6.000 5.500 50.00 275.00

62 2 + 300.00 5.00 6.000 5.500 50.00 275.00

63 2 + 350.00 5.00 6.000 5.500 50.00 275.00

64 2 + 400.00 5.00 6.000 5.500 45.00 275.00

65 2 + 445.00 4.00 4.000 4.000 4.00 200.00

66 2 + 449.00 4.00 4.000 4.000 1.00 200.00

67 2 + 450.00 6.00 6.000 6.000 50.00 300.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.3.5a

JENIS PEKERJAAN : Laston- Lapis Aus (AC-WC)

SATUAN PEMBAYARAN : M2

NO STATIONPANJANG LEBAR VOLUME

KET( M ) ( M2 ) ATAS

( M ) BAWAH

( M ) RATA -RATA

( M )

68 2 + 500.00 6.00 6.000 6.000 50.00 300.00

69 2 + 550.00 6.00 6.000 6.000 50.00 300.00

70 2 + 600.00 6.00 6.000 6.000 10.00 300.00

71 2 + 610.00 6.00 6.000 6.000 4.30 300.00

72 2 + 614.30 4.00 4.000 4.000 35.70 200.00

73 2 + 650.00 4.00 4.000 4.000 50.00 200.00

74 2 + 700.00 6.00 6.000 6.000 48.00 300.00

75 2 + 748.00 6.00 6.000 6.000 2.00 300.00

76 2 + 750.00 6.00 6.000 6.000 48.00 300.00

77 2 + 798.00 6.00 6.000 6.000 2.00 300.00

78 2 + 800.00 6.00 6.000 6.000 50.00 300.00

79 2 + 850.00 6.00 6.000 6.000 50.00 300.00

80 2 + 900.00 6.00 6.00 6.000 50.00 300.00

81 2 + 950.00 6.00 6.000 6.000 50.00 300.00

82 3 + 000.00 6.00 6.000 6.000 50.00 300.00

83 3 + 050.00 6.00 6.000 6.000 50.00 300.00

84 3 + 100.00 6.00 6.000 6.000 50.00 300.00

85 3 + 150.00 6.00 6.000 6.000 50.00 300.00

86 3 + 200.00 6.00 6.000 6.000 50.00 300.00

87 3 + 250.00 6.00 6.000 6.000 50.00 300.00

88 3 + 300.00 6.00 6.000 6.000 50.00 300.00

89 3 + 350.00 6.00 6.000 6.000 50.00 300.00

90 3 + 400.00 6.00 6.000 6.000 50.00 300.00

91 3 + 450.00 6.00 6.000 6.000 50.00 300.00

92 3 + 500.00 6.00 6.000 6.000 7.00 300.00

93 3 + 507.00 4.00 4.000 4.000 7.00 200.00

94 3 + 514.00 4.00 4.000 4.000 36.00 200.00

95 3 + 550.00 6.00 6.000 6.000 50.00 300.00

96 3 + 600.00 6.00 6.000 6.000 50.00 300.00

97 3 + 650.00 6.00 6.000 6.000 50.00 300.00

98 3 + 700.00 6.00 6.000 6.000 50.00 300.00

99 3 + 750.00 6.00 6.000 6.000 50.00 300.00

100 3 + 800.00 6.00 6.000 6.000 50.00 300.00

101 3 + 850.00 6.00 6.000 6.000 50.00 300.00

102 3 + 900.00 6.00 6.000 6.000

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.3.5a

JENIS PEKERJAAN : Laston- Lapis Aus (AC-WC)

SATUAN PEMBAYARAN : M2

NO STATIONPANJANG LEBAR VOLUME

KET( M ) ( M2 ) ATAS

( M ) BAWAH

( M ) RATA -RATA

( M )

50.00 300.00 103 3 + 950.00 6.00 6.000 6.000

50.00 300.00 104 4 + 000.00 6.00 6.000 6.000

50.00 300.00 105 4 + 050.00 6.00 6.000 6.000

5.00 300.00 106 4 + 055.00 4.00 4.000 4.000

8.40 200.00 107 4 + 063.40 4.00 4.000 4.000

36.60 200.00 108 4 + 100.00 6.00 6.000 6.000

50.00 300.00 109 4 + 150.00 6.00 6.000 6.000

50.00 300.00 110 4 + 200.00 6.00 6.000 6.000

50.00 300.00 111 4 + 250.00 6.00 6.000 6.000

50.00 300.00 112 4 + 300.00 6.00 6.000 6.000

50.00 300.00 113 4 + 350.00 6.00 6.000 6.000

50.00 300.00 114 4 + 400.00 6.00 6.000 6.000

50.00 300.00 115 4 + 450.00 6.00 6.000 6.000

50.00 300.00 116 4 + 500.00 6.00 6.000 6.000

50.00 300.00 117 4 + 550.00 6.00 6.000 6.000

50.00 300.00 118 4 + 600.00 6.00 6.000 6.000

50.00 300.00 119 4 + 650.00 6.00 6.000 6.000

50.00 300.00 120 4 + 700.00 6.00 6.000 6.000

50.00 300.00 121 4 + 750.00 6.00 6.000 6.000

50.00 300.00 122 4 + 800.00 6.00 6.000 6.000

50.00 300.00 123 4 + 850.00 6.00 6.000 6.000

50.00 300.00 124 4 + 900.00 6.00 6.000 6.000

50.00 300.00 125 4 + 950.00 6.00 6.000 6.000

50.00 300.00 126 5 + 000.00 6.00 6.000 6.000

50.00 300.00 127 5 + 050.00 6.00 6.000 6.000

50.00 300.00 128 5 + 100.00 6.00 6.000 6.000

50.00 300.00 129 5 + 150.00 6.00 6.000 6.000

50.00 300.00 130 5 + 200.00 6.00 6.000 6.000

50.00 300.00 131 5 + 250.00 6.00 6.000 6.000

50.00 300.00 132 5 + 300.00 6.00 6.000 6.000

50.00 300.00 133 5 + 350.00 6.00 6.000 6.000

50.00 300.00 134 5 + 400.00 6.00 6.000 6.000

50.00 300.00 135 5 + 450.00 6.00 6.000 6.000

50.00 300.00 136 5 + 500.00 6.00 6.000 6.000

50.00 300.00 137 5 + 550.00 6.00 6.000 6.000

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.3.5a

JENIS PEKERJAAN : Laston- Lapis Aus (AC-WC)

SATUAN PEMBAYARAN : M2

NO STATIONPANJANG LEBAR VOLUME

KET( M ) ( M2 ) ATAS

( M ) BAWAH

( M ) RATA -RATA

( M )

50.00 300.00 138 5 + 600.00 6.00 6.000 6.000

50.00 300.00 139 5 + 650.00 6.00 6.000 6.000

50.00 300.00 140 5 + 700.00 6.00 6.000 6.000

50.00 300.00 141 5 + 750.00 6.00 6.000 6.000

50.00 300.00 142 5 + 800.00 6.00 6.000 6.000

50.00 300.00 143 5 + 850.00 6.00 6.000 6.000

50.00 300.00 144 5 + 900.00 6.00 6.000 6.000

50.00 300.00 145 5 + 950.00 6.00 6.000 6.000

50.00 300.00 146 6 + 000.00 6.00 6.000 6.000

50.00 300.00 147 6 + 050.00 6.00 6.000 6.000

50.00 300.00 148 6 + 100.00 6.00 6.000 6.000

50.00 300.00 149 6 + 150.00 6.00 6.000 6.000

50.00 300.00 150 6 + 200.00 6.00 6.000 6.000

50.00 300.00 151 6 + 250.00 6.00 6.000 6.000

50.00 300.00 152 6 + 300.00 6.00 6.000 6.000

50.00 300.00 153 6 + 350.00 6.00 6.000 6.000

50.00 300.00 154 6 + 400.00 6.00 6.000 6.000

50.00 300.00 155 6 + 450.00 6.00 6.000 6.000

50.00 300.00 156 6 + 500.00 6.00 6.000 6.000

50.00 300.00 157 6 + 550.00 6.00 6.00 6.000

50.00 300.00 158 6 + 600.00 6.00 6.000 6.000

50.00 300.00 159 6 + 650.00 6.00 6.000 6.000

50.00 300.00 160 6 + 700.00 6.00 6.000 6.000

50.00 300.00 161 6 + 750.00 6.00 6.000 6.000

50.00 300.00 162 6 + 800.00 6.00 6.000 6.000

50.00 300.00 163 6 + 850.00 6.00 6.000 6.000

50.00 300.00 164 6 + 900.00 6.00 6.000 6.000

50.00 300.00 165 6 + 950.00 6.00 6.000 6.000

50.00 300.00 166 7 + 000.00 6.00 6.000 6.000

50.00 300.00 167 7 + 050.00 6.00 6.000 6.000

50.00 300.00 168 7 + 100.00 6.00 6.000 6.000

50.00 300.00 169 7 + 150.00 6.00 6.000 6.000

50.00 300.00 170 7 + 200.00 6.00 6.000 6.000

50.00 300.00 171 7 + 250.00 6.00 6.000 6.000

50.00 300.00 172 7 + 300.00 6.00 6.000 6.000

50.00 300.00 173 7 + 350.00 6.00 6.000 6.000

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.3.5a

JENIS PEKERJAAN : Laston- Lapis Aus (AC-WC)

SATUAN PEMBAYARAN : M2

NO STATIONPANJANG LEBAR VOLUME

KET( M ) ( M2 ) ATAS

( M ) BAWAH

( M ) RATA -RATA

( M )

50.00 300.00 174 7 + 400.00 6.00 6.000 6.000

50.00 300.00 175 7 + 450.00 6.00 6.000 6.000

50.00 300.00 176 7 + 500.00 6.00 6.000 6.000

50.00 300.00 177 7 + 550.00 6.00 6.000 6.000

50.00 300.00 178 7 + 600.00 6.00 6.000 6.000

50.00 300.00 179 7 + 650.00 6.00 6.000 6.000

30.00 300.00 180 7 + 680.00 6.00 6.000 6.000

20.00 300.00 181 7 + 700.00 6.00 6.000 6.000

50.00 300.00 182 7 + 750.00 6.00 6.000 6.000

50.00 300.00 183 7 + 800.00 6.00 6.000 6.000

50.00 300.00 184 7 + 850.00 6.00 6.000 6.000

50.00 300.00 185 7 + 900.00 6.00 6.000 6.000

50.00 300.00 186 7 + 950.00 6.00 6.000 6.000

50.00 300.00 187 8 + 000.00 6.00 6.000 6.000

15.00 300.00 188 8 + 015.00 4.00 4.000 4.000

5.00 200.00 189 8 + 020.00 4.00 4.000 4.000

30.00 200.00 190 8 + 050.00 6.00 6.000 6.000

50.00 300.00 191 8 + 100.00 6.00 6.000 6.000

50.00 300.00 192 8 + 150.00 6.00 6.000 6.000

50.00 300.00 193 8 + 200.00 6.00 6.000 6.000

50.00 300.00 194 8 + 250.00 6.00 6.000 6.000

50.00 300.00 195 8 + 300.00 6.00 6.000 6.000

50.00 300.00 196 8 + 350.00 6.00 6.000 6.000

50.00 300.00 197 8 + 400.00 6.00 6.000 6.000

50.00 300.00 198 8 + 450.00 6.00 6.000 6.000

50.00 300.00 199 8 + 500.00 6.00 6.000 6.000

50.00 300.00 200 8 + 550.00 6.00 6.000 6.000

50.00 300.00 201 8 + 600.00 6.00 6.000 6.000

50.00 300.00 202 8 + 650.00 6.00 6.000 6.000

50.00 300.00 203 8 + 700.00 6.00 6.000 6.000

50.00 300.00 204 8 + 750.00 6.00 6.000 6.000

50.00 300.00 205 8 + 800.00 6.00 6.000 6.000

50.00 300.00 206 8 + 850.00 6.00 6.000 6.000

50.00 300.00 207 8 + 900.00 6.00 6.000 6.000

50.00 300.00 208 8 + 950.00 6.00 6.000 6.000

50.00 300.00 209 9 + 000.00 6.00 6.000 6.000

50.00 300.00

JUMLAH 59,875.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.3.6a

JENIS PEKERJAAN : Laston-Lapis Antara (AC-BC)

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

1 0 + 000.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

2 0 + 050.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

3 0 + 100.00 6.00 6.00 6.000 0.040 0.240 19.00 0.24 4.56

4 0 + 119.00 4.00 4.000 4.000 0.040 0.240 9.00 0.24 2.16

5 0 + 128.00 4.00 4.000 4.000 0.040 0.240 22.00 0.24 5.28

6 0 + 150.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

7 0 + 200.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

8 0 + 250.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

9 0 + 300.00 6.00 6.000 6.000 0.040 0.240 36.00 0.24 8.64

10 0 + 336.00 4.00 4.000 4.000 0.040 0.240 7.00 0.24 1.68

11 0 + 343.00 4.00 4.000 4.000 0.040 0.240 7.00 0.24 1.68

12 0 + 350.00 6.00 6.000 6.000 0.040 0.240 2.00 0.24 0.48

13 0 + 352.00 4.00 4.000 4.000 0.040 0.240 12.00 0.24 2.88

14 0 + 364.00 4.00 4.000 4.000 0.040 0.240 36.00 0.24 8.64

15 0 + 400.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

16 0 + 450.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

17 0 + 500.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

18 0 + 550.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

19 0 + 600.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

20 0 + 650.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

21 0 + 700.00 6.00 6.000 6.000 0.040 0.240 25.00 0.24 6.00

22 0 + 725.00 4.00 4.000 4.000 0.040 0.240 5.00 0.24 1.20

23 0 + 730.00 4.00 4.000 4.000 0.040 0.240 20.00 0.24 4.80

24 0 + 750.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

25 0 + 800.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

26 0 + 850.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

27 0 + 900.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

28 0 + 950.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

29 1 + 000.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

30 1 + 050.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

31 1 + 100.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

32 1 + 150.00 4.00 4.000 4.000 0.040 0.240 6.00 0.24 1.44

33 1 + 156.00 4.00 4.000 4.000 0.040 0.240 44.00 0.24 10.56

34 1 + 200.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

35 1 + 250.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

36 1 + 300.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

37 1 + 350.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

38 1 + 400.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

39 1 + 450.00 6.00 6.000 6.000 0.040 0.240 26.00 0.24 6.24

40 1 + 476.00 4.00 4.000 4.000 0.040 0.240

ATAS ( M )

BAWAH ( M )

RATA -RATA ( M )

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.3.6a

JENIS PEKERJAAN : Laston-Lapis Antara (AC-BC)

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

ATAS ( M )

BAWAH ( M )

RATA -RATA ( M )

8.00 0.24 1.92 41 1 + 484.00 4.00 4.000 4.000 0.040 0.240

16.00 0.24 3.84 42 1 + 500.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 43 1 + 550.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 44 1 + 600.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 45 1 + 650.00 6.00 6.000 6.000 0.040 0.240

40.00 0.24 9.60 46 1 + 690.00 4.00 4.000 4.000 0.040 0.240

6.00 0.24 1.44 47 1 + 696.00 4.00 4.000 4.000 0.040 0.240

4.00 0.24 0.96 48 1 + 700.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 49 1 + 750.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 50 1 + 800.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 51 1 + 850.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 52 1 + 900.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 53 1 + 950.00 6.00 6.000 6.000 0.040 0.240

34.00 0.24 8.16 54 1 + 984.00 4.00 4.000 4.000 0.040 0.240

8.00 0.24 1.92 55 1 + 992.00 4.00 4.000 4.000 0.040 0.240

8.00 0.24 1.92 56 2 + 000.00 5.00 6.000 5.500 0.040 0.240

50.00 0.24 12.00 57 2 + 050.00 5.00 6.000 5.500 0.040 0.240

50.00 0.24 12.00 58 2 + 100.00 5.00 6.000 5.500 0.040 0.240

50.00 0.24 12.00 59 2 + 150.00 5.00 6.000 5.500 0.040 0.240

50.00 0.24 12.00 60 2 + 200.00 5.00 6.000 5.500 0.040 0.240

50.00 0.24 12.00 61 2 + 250.00 5.00 6.000 5.500 0.040 0.240

50.00 0.24 12.00 62 2 + 300.00 5.00 6.000 5.500 0.040 0.240

50.00 0.24 12.00 63 2 + 350.00 5.00 6.000 5.500 0.040 0.240

50.00 0.24 12.00 64 2 + 400.00 5.00 6.000 5.500 0.040 0.240

45.00 0.24 10.80 65 2 + 445.00 4.00 4.000 4.000 0.040 0.240

4.00 0.24 0.96 66 2 + 449.00 4.00 4.000 4.000 0.040 0.240

1.00 0.24 0.24 67 2 + 450.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 68 2 + 500.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 69 2 + 550.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 70 2 + 600.00 6.00 6.000 6.000 0.040 0.240

10.00 0.24 2.40 71 2 + 610.00 6.00 6.000 6.000 0.040 0.240

4.30 0.24 1.03 72 2 + 614.30 4.00 4.000 4.000 0.040 0.240

35.70 0.24 8.57 73 2 + 650.00 4.00 4.000 4.000 0.040 0.240

50.00 0.24 12.00 74 2 + 700.00 6.00 6.000 6.000 0.040 0.240

48.00 0.24 11.52 75 2 + 748.00 6.00 6.000 6.000 0.040 0.240

2.00 0.24 0.48 76 2 + 750.00 6.00 6.000 6.000 0.040 0.240

48.00 0.24 11.52 77 2 + 798.00 6.00 6.000 6.000 0.040 0.240

2.00 0.24 0.48 78 2 + 800.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 79 2 + 850.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.3.6a

JENIS PEKERJAAN : Laston-Lapis Antara (AC-BC)

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

ATAS ( M )

BAWAH ( M )

RATA -RATA ( M )

80 2 + 900.00 6.00 6.00 6.000 0.040 0.240 50.00 0.24 12.00

81 2 + 950.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

82 3 + 000.00 6.00 6.000 6.000 0.040 0.240 50.00 0.24 12.00

83 3 + 050.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 84 3 + 100.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 85 3 + 150.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 86 3 + 200.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 87 3 + 250.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 88 3 + 300.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 89 3 + 350.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 90 3 + 400.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 91 3 + 450.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 92 3 + 500.00 6.00 6.000 6.000 0.040 0.240

7.00 0.24 1.68 93 3 + 507.00 4.00 4.000 4.000 0.040 0.240

7.00 0.24 1.68 94 3 + 514.00 4.00 4.000 4.000 0.040 0.240

36.00 0.24 8.64 95 3 + 550.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 96 3 + 600.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 97 3 + 650.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 98 3 + 700.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 99 3 + 750.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 100 3 + 800.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 101 3 + 850.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 102 3 + 900.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 103 3 + 950.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 104 4 + 000.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 105 4 + 050.00 6.00 6.000 6.000 0.040 0.240

5.00 0.24 1.20 106 4 + 055.00 4.00 4.000 4.000 0.040 0.240

8.40 0.24 2.02 107 4 + 063.40 4.00 4.000 4.000 0.040 0.240

36.60 0.24 8.78 108 4 + 100.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 109 4 + 150.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 110 4 + 200.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 111 4 + 250.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 112 4 + 300.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 113 4 + 350.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 114 4 + 400.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 115 4 + 450.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 116 4 + 500.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 117 4 + 550.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 118 4 + 600.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 119 4 + 650.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 120 4 + 700.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.3.6a

JENIS PEKERJAAN : Laston-Lapis Antara (AC-BC)

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

ATAS ( M )

BAWAH ( M )

RATA -RATA ( M )

121 4 + 750.0050.00

6.00 6.000 6.000 0.040 0.240 0.24 12.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.3.6a

JENIS PEKERJAAN : Laston-Lapis Antara (AC-BC)

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

ATAS ( M )

BAWAH ( M )

RATA -RATA ( M )

50.00 0.24 12.00 122 4 + 800.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 123 4 + 850.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 124 4 + 900.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 125 4 + 950.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 126 5 + 000.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 127 5 + 050.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 128 5 + 100.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 129 5 + 150.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 130 5 + 200.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 131 5 + 250.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 132 5 + 300.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 133 5 + 350.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 134 5 + 400.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 135 5 + 450.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 136 5 + 500.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 137 5 + 550.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 138 5 + 600.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 139 5 + 650.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 140 5 + 700.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 141 5 + 750.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 142 5 + 800.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 143 5 + 850.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 144 5 + 900.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 145 5 + 950.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 146 6 + 000.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 147 6 + 050.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 148 6 + 100.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 149 6 + 150.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 150 6 + 200.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 151 6 + 250.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 152 6 + 300.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 153 6 + 350.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 154 6 + 400.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 155 6 + 450.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 156 6 + 500.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 157 6 + 550.00 6.00 6.00 6.000 0.040 0.240

50.00 0.24 12.00 158 6 + 600.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 159 6 + 650.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 160 6 + 700.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 161 6 + 750.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 162 6 + 800.00 6.00 6.000 6.000 0.040 0.240

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.3.6a

JENIS PEKERJAAN : Laston-Lapis Antara (AC-BC)

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

ATAS ( M )

BAWAH ( M )

RATA -RATA ( M )

50.00 0.24 12.00 163 6 + 850.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 164 6 + 900.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 165 6 + 950.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 166 7 + 000.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 167 7 + 050.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 168 7 + 100.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 169 7 + 150.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 170 7 + 200.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 171 7 + 250.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 172 7 + 300.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 173 7 + 350.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 174 7 + 400.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 175 7 + 450.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 176 7 + 500.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 177 7 + 550.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 178 7 + 600.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 179 7 + 650.00 6.00 6.000 6.000 0.040 0.240

30.00 0.24 7.20 180 7 + 680.00 6.00 6.000 6.000 0.040 0.240

20.00 0.24 4.80 181 7 + 700.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 182 7 + 750.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 183 7 + 800.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 184 7 + 850.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 185 7 + 900.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 186 7 + 950.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 187 8 + 000.00 6.00 6.000 6.000 0.040 0.240

15.00 0.24 3.60 188 8 + 015.00 4.00 4.000 4.000 0.040 0.240

5.00 0.24 1.20 189 8 + 020.00 4.00 4.000 4.000 0.040 0.240

30.00 0.24 7.20 190 8 + 050.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 191 8 + 100.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 192 8 + 150.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 193 8 + 200.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 194 8 + 250.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 195 8 + 300.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 196 8 + 350.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 197 8 + 400.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 198 8 + 450.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 199 8 + 500.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 200 8 + 550.00 6.00 6.000 6.000 0.040 0.240

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.3.6a

JENIS PEKERJAAN : Laston-Lapis Antara (AC-BC)

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

ATAS ( M )

BAWAH ( M )

RATA -RATA ( M )

50.00 0.24 12.00 201 8 + 600.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 202 8 + 650.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 203 8 + 700.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 204 8 + 750.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 205 8 + 800.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 206 8 + 850.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 207 8 + 900.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 208 8 + 950.00 6.00 6.000 6.000 0.040 0.240

50.00 0.24 12.00 209 9 + 000.00 6.00 6.000 6.000 0.040 0.240

JUMLAH 2,160.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 5.1

JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

KIRI ( M )

KANAN ( M )

LEBAR TOTAL

( M ) 1 0 + 000.00 1.00 1.00 2.000 0.150 0.30

50.00 0.30 15.00 2 0 + 050.00 1.00 1.00 2.000 0.150 0.30

50.00 0.34 16.88 3 0 + 100.00 1.25 1.25 2.500 0.150 0.38

19.00 0.19 3.56 4 0 + 119.00 - - - 0.150 -

9.00 - - 5 0 + 128.00 - - - 0.150 -

22.00 0.19 4.13 6 0 + 150.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 7 0 + 200.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 8 0 + 250.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 9 0 + 300.00 1.25 1.250 2.500 0.150 0.38

36.00 0.19 6.75 10 0 + 336.00 - - - 0.150 -

7.00 - - 11 0 + 343.00 - - - 0.150 -

7.00 0.19 1.31 12 0 + 350.00 1.25 1.250 2.500 0.150 0.38

2.00 0.19 0.38 13 0 + 352.00 - - - 0.150 -

12.00 - - 14 0 + 364.00 - - - 0.150 -

36.00 0.19 6.75 15 0 + 400.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 16 0 + 450.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 17 0 + 500.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 18 0 + 550.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 19 0 + 600.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 20 0 + 650.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 21 0 + 700.00 1.25 1.250 2.500 0.150 0.38

25.00 0.19 4.69 22 0 + 725.00 - - - 0.150 -

5.00 - - 23 0 + 730.00 - - - 0.150 -

20.00 0.19 3.75 24 0 + 750.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 25 0 + 800.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 26 0 + 850.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 27 0 + 900.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 28 0 + 950.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 29 1 + 000.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 30 1 + 050.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 31 1 + 100.00 1.25 1.250 2.500 0.150 0.38

50.00 0.19 9.38 32 1 + 150.00 - - - 0.150 -

6.00 - - 33 1 + 156.00 - - - 0.150 -

44.00 0.19 8.25 34 1 + 200.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 35 1 + 250.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 36 1 + 300.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 37 1 + 350.00 1.25 1.250 2.500 0.150 0.38

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 5.1

JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

KIRI ( M )

KANAN ( M )

LEBAR TOTAL

( M ) 37 1 + 350.0050.00

1.25 1.250 2.500 0.150 0.38 0.38 18.75

38 1 + 400.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

39 1 + 450.00 1.25 1.250 2.500 0.150 0.38 26.00 0.19 4.88

40 1 + 476.00 - - - 0.150 -

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 5.1

JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

KIRI ( M )

KANAN ( M )

LEBAR TOTAL

( M ) 8.00 - -

41 1 + 484.00 - - - 0.150 - 16.00 0.15 2.40

42 1 + 500.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00

43 1 + 550.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00

44 1 + 600.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00

45 1 + 650.00 1.00 1.000 2.000 0.150 0.30 40.00 0.15 6.00

46 1 + 690.00 - - - 0.150 - 6.00 - -

47 1 + 696.00 - - - 0.150 - 4.00 0.19 0.75

48 1 + 700.00 1.25 1.250 2.500 0.150 0.38 50.00 0.34 16.88

49 1 + 750.00 1.00 1.000 2.000 0.150 0.30 50.00 0.34 16.88

50 1 + 800.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

51 1 + 850.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

52 1 + 900.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

53 1 + 950.00 1.25 1.250 2.500 0.150 0.38 34.00 0.19 6.38

54 1 + 984.00 - - - 0.150 - 8.00 - -

55 1 + 992.00 - - - 0.150 - 8.00 0.19 1.50

56 2 + 000.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

57 2 + 050.00 1.25 1.250 2.500 0.150 0.38 50.00 0.34 16.88

58 2 + 100.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00

59 2 + 150.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00

60 2 + 200.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00

61 2 + 250.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00

62 2 + 300.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00

63 2 + 350.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00

64 2 + 400.00 1.00 1.000 2.000 0.150 0.30 45.00 0.15 6.75

65 2 + 445.00 - - - 0.150 - 4.00 - -

66 2 + 449.00 - - - 0.150 - 1.00 0.15 0.15

67 2 + 450.00 1.00 1.000 2.000 0.150 0.30 50.00 0.34 16.88

68 2 + 500.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

69 2 + 550.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

70 2 + 600.00 1.25 1.250 2.500 0.150 0.38 10.00 0.19 1.88

71 2 + 610.00 - - - 0.150 - 4.30 - -

72 2 + 614.30 - - - 0.150 - 35.70 0.19 6.69

73 2 + 650.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

74 2 + 700.00 1.25 1.250 2.500 0.150 0.38 48.00 0.38 18.00

75 2 + 748.00 1.25 1.250 2.500 0.150 0.38 2.00 0.19 0.38

76 2 + 750.00 - - - 0.150 - 48.00 - -

77 2 + 798.00 - - - 0.150 - 2.00 0.19 0.38

78 2 + 800.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

79 2 + 850.00 1.25 1.250 2.500 0.150 0.38 50.00 0.40 19.88

80 2 + 900.00 1.40 1.400 2.800 0.150 0.42 50.00 0.42 21.00

81 2 + 950.00 1.40 1.400 2.800 0.150 0.42

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 5.1

JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

KIRI ( M )

KANAN ( M )

LEBAR TOTAL

( M ) 50.00 0.42 21.00

82 3 + 000.00 1.40 1.400 2.800 0.150 0.42

50.00 0.40 19.88

83 3 + 050.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75

84 3 + 100.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75

85 3 + 150.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75

86 3 + 200.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75

87 3 + 250.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 88 3 + 300.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 89 3 + 350.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 90 3 + 400.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 91 3 + 450.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 92 3 + 500.00 1.25 1.250 2.500 0.150 0.38

7.00 0.19 1.31 93 3 + 507.00 - - - 0.150 -

7.00 - - 94 3 + 514.00 - - - 0.150 -

36.00 0.19 6.75 95 3 + 550.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 96 3 + 600.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 97 3 + 650.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 98 3 + 700.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 99 3 + 750.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 100 3 + 800.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 101 3 + 850.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 102 3 + 900.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 103 3 + 950.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 104 4 + 000.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 105 4 + 050.00 1.25 1.250 2.500 0.150 0.38

5.00 0.19 0.94 106 4 + 055.00 - - - 0.150 -

8.40 - - 107 4 + 063.40 - - - 0.150 -

36.60 0.19 6.86 108 4 + 100.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 109 4 + 150.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 110 4 + 200.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 111 4 + 250.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 112 4 + 300.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 5.1

JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

KIRI ( M )

KANAN ( M )

LEBAR TOTAL

( M ) 113 4 + 350.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 114 4 + 400.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 115 4 + 450.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 116 4 + 500.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 117 4 + 550.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 118 4 + 600.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 119 4 + 650.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 120 4 + 700.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 121 4 + 750.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 122 4 + 800.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 123 4 + 850.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 124 4 + 900.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 125 4 + 950.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 126 5 + 000.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 127 5 + 050.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 128 5 + 100.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 129 5 + 150.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 130 5 + 200.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 131 5 + 250.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 132 5 + 300.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 133 5 + 350.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 134 5 + 400.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 135 5 + 450.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 136 5 + 500.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 137 5 + 550.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 138 5 + 600.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 139 5 + 650.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 140 5 + 700.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 141 5 + 750.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 142 5 + 800.00 1.25 1.250 2.500 0.150 0.38

50.00 0.40 19.88 143 5 + 850.00 1.40 1.400 2.800 0.150 0.42

50.00 0.42 21.00 144 5 + 900.00 1.40 1.400 2.800 0.150 0.42

50.00 0.42 21.00 145 5 + 950.00 1.40 1.400 2.800 0.150 0.42

50.00 0.42 21.00 146 6 + 000.00 1.40 1.400 2.800 0.150 0.42

50.00 0.42 21.00 147 6 + 050.00 1.40 1.400 2.800 0.150 0.42

50.00 0.42 21.00 148 6 + 100.00 1.40 1.400 2.800 0.150 0.42

50.00 0.42 21.00 149 6 + 150.00 1.40 1.400 2.800 0.150 0.42

50.00 0.42 21.00 150 6 + 200.00 1.40 1.400 2.800 0.150 0.42

50.00 0.42 21.00 151 6 + 250.00 1.40 1.400 2.800 0.150 0.42

50.00 0.40 19.88 152 6 + 300.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 153 6 + 350.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 154 6 + 400.00 1.25 1.250 2.500 0.150 0.38

50.00 0.38 18.75 155 6 + 450.00 1.25 1.250 2.500 0.150 0.38

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 5.1

JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

KIRI ( M )

KANAN ( M )

LEBAR TOTAL

( M ) 155 6 + 450.00 1.25 1.250 2.500 0.150 0.38

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 5.1

JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

KIRI ( M )

KANAN ( M )

LEBAR TOTAL

( M ) 50.00 0.38 18.75

156 6 + 500.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

157 6 + 550.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

158 6 + 600.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

159 6 + 650.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

160 6 + 700.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

161 6 + 750.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

162 6 + 800.00 1.25 1.250 2.500 0.150 0.38 50.00 0.40 19.88

163 6 + 850.00 1.40 1.400 2.800 0.150 0.42 50.00 0.42 21.00

164 6 + 900.00 1.40 1.400 2.800 0.150 0.42 50.00 0.42 21.00

165 6 + 950.00 1.40 1.400 2.800 0.150 0.42 50.00 0.40 19.88

166 7 + 000.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

167 7 + 050.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

168 7 + 100.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

169 7 + 150.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

170 7 + 200.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

171 7 + 250.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

172 7 + 300.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

173 7 + 350.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

174 7 + 400.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

175 7 + 450.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

176 7 + 500.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

177 7 + 550.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

178 7 + 600.00 1.25 1.250 2.500 0.150 0.38 50.00 0.38 18.75

179 7 + 650.00 1.25 1.250 2.500 0.150 0.38 30.00 0.19 5.63

180 7 + 680.00 - - - 0.150 - 20.00 - -

181 7 + 700.00 - - - 0.150 - 50.00 0.19 9.38

182 7 + 750.00 1.25 1.250 2.500 0.150 0.38 50.00 0.34 16.88

183 7 + 800.00 1.00 1.000 2.000 0.150 0.30 50.00 0.34 16.88

184 7 + 850.00 1.25 1.250 2.500 0.150 0.38 50.00 0.34 16.88

185 7 + 900.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00

186 7 + 950.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00

187 8 + 000.00 1.00 1.000 2.000 0.150 0.30 15.00 0.15 2.25

188 8 + 015.00 - - - 0.150 - 5.00 - -

189 8 + 020.00 - - - 0.150 - 30.00 0.15 4.50

190 8 + 050.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00

191 8 + 100.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00

192 8 + 150.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00

193 8 + 200.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00

194 8 + 250.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00

195 8 + 300.00 1.00 1.000 2.000 0.150 0.30 50.00 0.30 15.00

196 8 + 350.00 1.00 1.000 2.000 0.150 0.30

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 5.1

JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

KIRI ( M )

KANAN ( M )

LEBAR TOTAL

( M ) 50.00 0.30 15.00

197 8 + 400.00 1.00 1.000 2.000 0.150 0.30 50.00 0.32 15.75

198 8 + 450.00 1.10 1.100 2.200 0.150 0.33 50.00 0.33 16.50

199 8 + 500.00 1.10 1.100 2.200 0.150 0.33 50.00 0.33 16.50

200 8 + 550.00 1.10 1.100 2.200 0.150 0.33 50.00 0.33 16.50

201 8 + 600.00 1.10 1.100 2.200 0.150 0.33 50.00 0.33 16.50

202 8 + 650.00 1.10 1.100 2.200 0.150 0.33 50.00 0.33 16.50

203 8 + 700.00 1.10 1.100 2.200 0.150 0.33

204 8 + 750.00 50.00 1.10 1.100 2.200 0.150 0.33 0.33 16.50

205 8 + 800.00 50.00 1.10 1.100 2.200 0.150 0.33 0.33 16.50

206 8 + 850.00 50.00 1.10 1.100 2.200 0.150 0.33 0.33 16.50

207 8 + 900.00 50.00 1.10 1.100 2.200 0.150 0.33 0.33 16.50

208 8 + 950.00 50.00 1.10 1.100 2.200 0.150 0.33 0.33 16.50

209 9 + 000.00 50.00 1.10 1.100 2.200 0.150 0.33 0.33 16.50

JUMLAH 3,099.92

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 5.2

JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 )

1 0 + 000.00 1.00 1.00 2.000 0.200 0.40 50.00 0.40 20.00

2 0 + 050.00 1.00 1.00 2.000 0.200 0.40 50.00 0.45 22.50

3 0 + 100.00 1.25 1.25 2.500 0.200 0.50 19.00 0.25 4.75

4 0 + 119.00 - - - 0.200 - 9.00 - -

5 0 + 128.00 - - - 0.200 - 22.00 0.25 5.50

6 0 + 150.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

7 0 + 200.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

8 0 + 250.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

9 0 + 300.00 1.25 1.250 2.500 0.200 0.50 36.00 0.25 9.00

10 0 + 336.00 - - - 0.200 - 7.00 - -

11 0 + 343.00 - - - 0.200 - 7.00 0.25 1.75

12 0 + 350.00 1.25 1.250 2.500 0.200 0.50 2.00 0.25 0.50

13 0 + 352.00 - - - 0.200 - 12.00 - -

14 0 + 364.00 - - - 0.200 - 36.00 0.25 9.00

15 0 + 400.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

16 0 + 450.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

17 0 + 500.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

18 0 + 550.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

19 0 + 600.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

20 0 + 650.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

21 0 + 700.00 1.25 1.250 2.500 0.200 0.50 25.00 0.25 6.25

22 0 + 725.00 - - - 0.200 - 5.00 - -

23 0 + 730.00 - - - 0.200 - 20.00 0.25 5.00

24 0 + 750.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

25 0 + 800.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

26 0 + 850.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

27 0 + 900.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

28 0 + 950.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

29 1 + 000.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

30 1 + 050.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

31 1 + 100.00 1.25 1.250 2.500 0.200 0.50 50.00 0.25 12.50

32 1 + 150.00 - - - 0.200 - 6.00 - -

33 1 + 156.00 - - - 0.200 - 44.00 0.25 11.00

34 1 + 200.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

35 1 + 250.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

KIRI ( M )

KANAN ( M )

LEBAR TOTAL

( M )

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 5.2

JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 ) KIRI

( M ) KANAN ( M )

LEBAR TOTAL

( M ) 36 1 + 300.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 37 1 + 350.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 38 1 + 400.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 39 1 + 450.00 1.25 1.250 2.500 0.200 0.50

26.00 0.25 6.50 40 1 + 476.00 - - - 0.200 -

8.00 - - 41 1 + 484.00 - - - 0.200 -

16.00 0.20 3.20 42 1 + 500.00 1.00 1.000 2.000 0.200 0.40

50.00 0.40 20.00 43 1 + 550.00 1.00 1.000 2.000 0.200 0.40

50.00 0.40 20.00 44 1 + 600.00 1.00 1.000 2.000 0.200 0.40

50.00 0.40 20.00 45 1 + 650.00 1.00 1.000 2.000 0.200 0.40

40.00 0.20 8.00 46 1 + 690.00 - - - 0.200 -

6.00 - - 47 1 + 696.00 - - - 0.200 -

4.00 0.25 1.00 48 1 + 700.00 1.25 1.250 2.500 0.200 0.50

50.00 0.45 22.50 49 1 + 750.00 1.00 1.000 2.000 0.200 0.40

50.00 0.45 22.50 50 1 + 800.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 51 1 + 850.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 52 1 + 900.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 53 1 + 950.00 1.25 1.250 2.500 0.200 0.50

34.00 0.25 8.50 54 1 + 984.00 - - - 0.200 -

8.00 - - 55 1 + 992.00 - - - 0.200 -

8.00 0.25 2.00 56 2 + 000.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 57 2 + 050.00 1.25 1.250 2.500 0.200 0.50

50.00 0.45 22.50 58 2 + 100.00 1.00 1.000 2.000 0.200 0.40

50.00 0.40 20.00 59 2 + 150.00 1.00 1.000 2.000 0.200 0.40

50.00 0.40 20.00 60 2 + 200.00 1.00 1.000 2.000 0.200 0.40

50.00 0.40 20.00 61 2 + 250.00 1.00 1.000 2.000 0.200 0.40

50.00 0.40 20.00 62 2 + 300.00 1.00 1.000 2.000 0.200 0.40

50.00 0.40 20.00 63 2 + 350.00 1.00 1.000 2.000 0.200 0.40

50.00 0.40 20.00 64 2 + 400.00 1.00 1.000 2.000 0.200 0.40

45.00 0.20 9.00 65 2 + 445.00 - - - 0.200 -

4.00 - - 66 2 + 449.00 - - - 0.200 -

1.00 0.20 0.20 67 2 + 450.00 1.00 1.000 2.000 0.200 0.40

50.00 0.45 22.50 68 2 + 500.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 69 2 + 550.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 5.2

JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 ) KIRI

( M ) KANAN ( M )

LEBAR TOTAL

( M ) 70 2 + 600.00 1.25 1.250 2.500 0.200 0.50

10.00 0.25 2.50 71 2 + 610.00 - - - 0.200 -

4.30 - - 72 2 + 614.30 - - - 0.200 -

35.70 0.25 8.93 73 2 + 650.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 74 2 + 700.00 1.25 1.250 2.500 0.200 0.50

48.00 0.50 24.00 75 2 + 748.00 1.25 1.250 2.500 0.200 0.50

2.00 0.25 0.50 76 2 + 750.00 - - - 0.200 -

48.00 - - 77 2 + 798.00 - - - 0.200 -

2.00 0.25 0.50 78 2 + 800.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 79 2 + 850.00 1.25 1.250 2.500 0.200 0.50

50.00 0.53 26.50 80 2 + 900.00 1.40 1.400 2.800 0.200 0.56

50.00 0.56 28.00 81 2 + 950.00 1.40 1.400 2.800 0.200 0.56

50.00 0.56 28.00

82 3 + 000.00 1.40 1.400 2.800 0.200 0.56

50.00 0.53 26.50

83 3 + 050.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00

84 3 + 100.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00

85 3 + 150.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00

86 3 + 200.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 87 3 + 250.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 88 3 + 300.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 89 3 + 350.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 90 3 + 400.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 91 3 + 450.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 92 3 + 500.00 1.25 1.250 2.500 0.200 0.50

7.00 0.25 1.75 93 3 + 507.00 - - - 0.200 -

7.00 - - 94 3 + 514.00 - - - 0.200 -

36.00 0.25 9.00 95 3 + 550.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 96 3 + 600.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 97 3 + 650.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 98 3 + 700.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 99 3 + 750.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 100 3 + 800.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 101 3 + 850.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 102 3 + 900.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 103 3 + 950.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 104 4 + 000.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 105 4 + 050.00 1.25 1.250 2.500 0.200 0.50

5.00 0.25 1.25 106 4 + 055.00 - - - 0.200 -

8.40 - - 107 4 + 063.40 - - - 0.200 -

36.60 0.25 9.15 108 4 + 100.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 109 4 + 150.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 110 4 + 200.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 5.2

JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 ) KIRI

( M ) KANAN ( M )

LEBAR TOTAL

( M ) 50.00 0.50 25.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 5.2

JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 ) KIRI

( M ) KANAN ( M )

LEBAR TOTAL

( M ) 111 4 + 250.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 112 4 + 300.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 113 4 + 350.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 114 4 + 400.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 115 4 + 450.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 116 4 + 500.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 117 4 + 550.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 118 4 + 600.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 119 4 + 650.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 120 4 + 700.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 121 4 + 750.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 122 4 + 800.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 123 4 + 850.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 124 4 + 900.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 125 4 + 950.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 126 5 + 000.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 127 5 + 050.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 128 5 + 100.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 129 5 + 150.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 130 5 + 200.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 131 5 + 250.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 132 5 + 300.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 133 5 + 350.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 134 5 + 400.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 135 5 + 450.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 136 5 + 500.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 137 5 + 550.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 138 5 + 600.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 139 5 + 650.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 140 5 + 700.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 141 5 + 750.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 142 5 + 800.00 1.25 1.250 2.500 0.200 0.50

50.00 0.53 26.50 143 5 + 850.00 1.40 1.400 2.800 0.200 0.56

50.00 0.56 28.00 144 5 + 900.00 1.40 1.400 2.800 0.200 0.56

50.00 0.56 28.00 145 5 + 950.00 1.40 1.400 2.800 0.200 0.56

50.00 0.56 28.00 146 6 + 000.00 1.40 1.400 2.800 0.200 0.56

50.00 0.56 28.00 147 6 + 050.00 1.40 1.400 2.800 0.200 0.56

50.00 0.56 28.00 148 6 + 100.00 1.40 1.400 2.800 0.200 0.56

50.00 0.56 28.00 149 6 + 150.00 1.40 1.400 2.800 0.200 0.56

50.00 0.56 28.00 150 6 + 200.00 1.40 1.400 2.800 0.200 0.56

50.00 0.56 28.00 151 6 + 250.00 1.40 1.400 2.800 0.200 0.56

50.00 0.53 26.50 152 6 + 300.00 1.25 1.250 2.500 0.200 0.50

50.00 0.50 25.00 153 6 + 350.00 1.25 1.250 2.500 0.200 0.50

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 5.2

JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 ) KIRI

( M ) KANAN ( M )

LEBAR TOTAL

( M ) 50.00 0.50 25.00

154 6 + 400.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

155 6 + 450.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

156 6 + 500.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

157 6 + 550.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

158 6 + 600.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

159 6 + 650.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

160 6 + 700.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

161 6 + 750.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

162 6 + 800.00 1.25 1.250 2.500 0.200 0.50 50.00 0.53 26.50

163 6 + 850.00 1.40 1.400 2.800 0.200 0.56 50.00 0.56 28.00

164 6 + 900.00 1.40 1.400 2.800 0.200 0.56 50.00 0.56 28.00

165 6 + 950.00 1.40 1.400 2.800 0.200 0.56 50.00 0.53 26.50

166 7 + 000.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

167 7 + 050.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

168 7 + 100.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

169 7 + 150.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

170 7 + 200.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

171 7 + 250.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

172 7 + 300.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

173 7 + 350.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

174 7 + 400.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

175 7 + 450.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

176 7 + 500.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

177 7 + 550.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

178 7 + 600.00 1.25 1.250 2.500 0.200 0.50 50.00 0.50 25.00

179 7 + 650.00 1.25 1.250 2.500 0.200 0.50 30.00 0.25 7.50

180 7 + 680.00 - - - 0.200 - 20.00 - -

181 7 + 700.00 - - - 0.200 - 50.00 0.25 12.50

182 7 + 750.00 1.25 1.250 2.500 0.200 0.50 50.00 0.45 22.50

183 7 + 800.00 1.00 1.000 2.000 0.200 0.40 50.00 0.45 22.50

184 7 + 850.00 1.25 1.250 2.500 0.200 0.50 50.00 0.45 22.50

185 7 + 900.00 1.00 1.000 2.000 0.200 0.40 50.00 0.40 20.00

186 7 + 950.00 1.00 1.000 2.000 0.200 0.40 50.00 0.40 20.00

187 8 + 000.00 1.00 1.000 2.000 0.200 0.40 15.00 0.20 3.00

188 8 + 015.00 - - - 0.200 - 5.00 - -

189 8 + 020.00 - - - 0.200 - 30.00 0.20 6.00

190 8 + 050.00 1.00 1.000 2.000 0.200 0.40 50.00 0.40 20.00

191 8 + 100.00 1.00 1.000 2.000 0.200 0.40 50.00 0.40 20.00

192 8 + 150.00 1.00 1.000 2.000 0.200 0.40 50.00 0.40 20.00

193 8 + 200.00 1.00 1.000 2.000 0.200 0.40 50.00 0.40 20.00

194 8 + 250.00 1.00 1.000 2.000 0.200 0.40 50.00 0.40 20.00

195 8 + 300.00 1.00 1.000 2.000 0.200 0.40 50.00 0.40 20.00

196 8 + 350.00 1.00 1.000 2.000 0.200 0.40

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 5.2

JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 ) KIRI

( M ) KANAN ( M )

LEBAR TOTAL

( M ) 196 8 + 350.00 1.00 1.000 2.000 0.200 0.40

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6 PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 5.2

JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG LEBAR TEBAL AREA RATA2 VOLUME

KET( M ) ( M) ( M2 ) ( M2 ) ( M3 ) KIRI

( M ) KANAN ( M )

LEBAR TOTAL

( M ) 50.00 0.40 20.00

197 8 + 400.00 1.00 1.000 2.000 0.200 0.40 50.00 0.42 21.00

198 8 + 450.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00

199 8 + 500.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00

200 8 + 550.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00

201 8 + 600.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00

202 8 + 650.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00

203 8 + 700.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00

204 8 + 750.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00

205 8 + 800.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00

206 8 + 850.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00

207 8 + 900.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00

208 8 + 950.00 1.10 1.100 2.200 0.200 0.44 50.00 0.44 22.00

209 9 + 000.00 1.10 1.100 2.200 0.200 0.44

JUMLAH 4,133.23

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.1.1

JENIS PEKERJAAN : Lapis Rsap Pengikat

SATUAN PEMBAYARAN : Liter

NO STATION

PANJANG LEBAR PENYERAPAN LUAS VOLUME

KET( M ) ( M ) ( LTR/MTR ) ( X = LTR/M) ( Ltr )

1 0 + 000.00 6.00 0.85 5.10 50.00 5.10 255.00

2 0 + 050.00 6.00 0.85 5.10 50.00 5.10 255.00

3 0 + 100.00 6.00 0.85 5.10 19.00 4.25 80.75

4 0 + 119.00 4.00 0.85 3.40 9.00 3.40 30.60

5 0 + 128.00 4.00 0.85 3.40 22.00 4.25 93.50

6 0 + 150.00 6.00 0.85 5.10 50.00 5.10 255.00

7 0 + 200.00 6.00 0.85 5.10 50.00 5.10 255.00

8 0 + 250.00 6.00 0.85 5.10 50.00 5.10 255.00

9 0 + 300.00 6.00 0.85 5.10 36.00 4.25 153.00

10 0 + 336.00 4.00 0.85 3.40 7.00 3.40 23.80

11 0 + 343.00 4.00 0.85 3.40 7.00 4.25 29.75

12 0 + 350.00 6.00 0.85 5.10 2.00 4.25 8.50

13 0 + 352.00 4.00 0.85 3.40 12.00 3.40 40.80

14 0 + 364.00 4.00 0.85 3.40 36.00 4.25 153.00

15 0 + 400.00 6.00 0.85 5.10 50.00 5.10 255.00

16 0 + 450.00 6.00 0.85 5.10 50.00 5.10 255.00

17 0 + 500.00 6.00 0.85 5.10 50.00 5.10 255.00

18 0 + 550.00 6.00 0.85 5.10 50.00 5.10 255.00

19 0 + 600.00 6.00 0.85 5.10 50.00 5.10 255.00

20 0 + 650.00 6.00 0.85 5.10 50.00 5.10 255.00

21 0 + 700.00 6.00 0.85 5.10 25.00 4.25 106.25

22 0 + 725.00 4.00 0.85 3.40 5.00 3.40 17.00

23 0 + 730.00 4.00 0.85 3.40 20.00 4.25 85.00

24 0 + 750.00 6.00 0.85 5.10 50.00 5.10 255.00

25 0 + 800.00 6.00 0.85 5.10 50.00 5.10 255.00

26 0 + 850.00 6.00 0.85 5.10 50.00 5.10 255.00

27 0 + 900.00 6.00 0.85 5.10 50.00 5.10 255.00

28 0 + 950.00 6.00 0.85 5.10 50.00 5.10 255.00

29 1 + 000.00 6.00 0.85 5.10 50.00 5.10 255.00

30 1 + 050.00 6.00 0.85 5.10 50.00 5.10 255.00

31 1 + 100.00 6.00 0.85 5.10 50.00 4.25 212.50

32 1 + 150.00 4.00 0.85 3.40 6.00 3.40 20.40

33 1 + 156.00 4.00 0.85 3.40 44.00 4.25 187.00

34 1 + 200.00 6.00 0.85 5.10 50.00 5.10 255.00

35 1 + 250.00 6.00 0.85 5.10 50.00 5.10 255.00

36 1 + 300.00 6.00 0.85 5.10 50.00 5.10 255.00

37 1 + 350.00 6.00 0.85 5.10 50.00 5.10 255.00

RATA2 ( LTR/M )

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.1.1

JENIS PEKERJAAN : Lapis Rsap Pengikat

SATUAN PEMBAYARAN : Liter

NO STATION

PANJANG LEBAR PENYERAPAN LUAS VOLUME

KET( M ) ( M ) ( LTR/MTR ) ( X = LTR/M) ( Ltr )

RATA2 ( LTR/M )

38 1 + 400.00 6.00 0.85 5.10 50.00 5.10 255.00

39 1 + 450.00 6.00 0.85 5.10 26.00 4.25 110.50

40 1 + 476.00 4.00 0.85 3.40 8.00 3.40 27.20

41 1 + 484.00 4.00 0.85 3.40 16.00 4.25 68.00

42 1 + 500.00 6.00 0.85 5.10 50.00 5.10 255.00

43 1 + 550.00 6.00 0.85 5.10 50.00 5.10 255.00

44 1 + 600.00 6.00 0.85 5.10 50.00 5.10 255.00

45 1 + 650.00 6.00 0.85 5.10 40.00 4.25 170.00

46 1 + 690.00 4.00 0.85 3.40 6.00 3.40 20.40

47 1 + 696.00 4.00 0.85 3.40 4.00 4.25 17.00

48 1 + 700.00 6.00 0.85 5.10 50.00 5.10 255.00

49 1 + 750.00 6.00 0.85 5.10 50.00 5.10 255.00

50 1 + 800.00 6.00 0.85 5.10 50.00 5.10 255.00

51 1 + 850.00 6.00 0.85 5.10 50.00 5.10 255.00

52 1 + 900.00 6.00 0.85 5.10 50.00 5.10 255.00

53 1 + 950.00 6.00 0.85 5.10 34.00 4.25 144.50

54 1 + 984.00 4.00 0.85 3.40 8.00 3.40 27.20

55 1 + 992.00 4.00 0.85 3.40 8.00 3.83 30.60

56 2 + 000.00 5.00 0.85 4.25 50.00 4.25 212.50

57 2 + 050.00 5.00 0.85 4.25 50.00 4.25 212.50

58 2 + 100.00 5.00 0.85 4.25 50.00 4.25 212.50

59 2 + 150.00 5.00 0.85 4.25 50.00 4.25 212.50

60 2 + 200.00 5.00 0.85 4.25 50.00 4.25 212.50

61 2 + 250.00 5.00 0.85 4.25 50.00 4.25 212.50

62 2 + 300.00 5.00 0.85 4.25 50.00 4.25 212.50

63 2 + 350.00 5.00 0.85 4.25 50.00 4.25 212.50

64 2 + 400.00 5.00 0.85 4.25 45.00 3.83 172.13

65 2 + 445.00 4.00 0.85 3.40 4.00 3.40 13.60

66 2 + 449.00 4.00 0.85 3.40 1.00 4.25 4.25

67 2 + 450.00 6.00 0.85 5.10 50.00 5.10 255.00

68 2 + 500.00 6.00 0.85 5.10 50.00 5.10 255.00

69 2 + 550.00 6.00 0.85 5.10 50.00 5.10 255.00

70 2 + 600.00 6.00 0.85 5.10 10.00 5.10 51.00

71 2 + 610.00 6.00 0.85 5.10 4.30 4.25 18.28

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.1.1

JENIS PEKERJAAN : Lapis Rsap Pengikat

SATUAN PEMBAYARAN : Liter

NO STATION

PANJANG LEBAR PENYERAPAN LUAS VOLUME

KET( M ) ( M ) ( LTR/MTR ) ( X = LTR/M) ( Ltr )

RATA2 ( LTR/M )

72 2 + 614.30 4.00 0.85 3.40 3.40 121.38 35.70

73 2 + 650.00 4.00 0.85 3.40 4.25 212.50 50.00

74 2 + 700.00 6.00 0.85 5.10 5.10 244.80 48.00

75 2 + 748.00 6.00 0.85 5.10 5.10 10.20 2.00

76 2 + 750.00 6.00 0.85 5.10 5.10 244.80 48.00

77 2 + 798.00 6.00 0.85 5.10 5.10 10.20 2.00

78 2 + 800.00 6.00 0.85 5.10 5.10 255.00 50.00

79 2 + 850.00 6.00 0.85 5.10 5.10 255.00 50.00

80 2 + 900.00 6.00 0.85 5.10 5.10 255.00 50.00

81 2 + 950.00 6.00 0.85 5.10 5.10 255.00 50.00

82 3 + 000.00 6.00 0.85 5.10 5.10 255.00

50.00

83 3 + 050.00 6.00 0.85 5.10 5.10 255.00

50.0084 3 + 100.00 6.00 0.85 5.10 5.10 255.00

50.0085 3 + 150.00 6.00 0.85 5.10 5.10 255.00

50.0086 3 + 200.00 6.00 0.85 5.10 5.10 255.00

50.0087 3 + 250.00 6.00 0.85 5.10 5.10 255.00

50.0088 3 + 300.00 6.00 0.85 5.10 5.10 255.00

50.0089 3 + 350.00 6.00 0.85 5.10 5.10 255.00

50.0090 3 + 400.00 6.00 0.85 5.10 5.10 255.00

50.0091 3 + 450.00 6.00 0.85 5.10 5.10 255.00

50.0092 3 + 500.00 6.00 0.85 5.10 4.25 29.75

7.0093 3 + 507.00 4.00 0.85 3.40 3.40 23.80

7.0094 3 + 514.00 4.00 0.85 3.40 4.25 153.00

36.0095 3 + 550.00 6.00 0.85 5.10 5.10 255.00

50.0096 3 + 600.00 6.00 0.85 5.10 5.10 255.00

50.0097 3 + 650.00 6.00 0.85 5.10 5.10 255.00

50.0098 3 + 700.00 6.00 0.85 5.10 5.10 255.00

50.0099 3 + 750.00 6.00 0.85 5.10 5.10 255.00

50.00100 3 + 800.00 6.00 0.85 5.10 5.10 255.00

50.00101 3 + 850.00 6.00 0.85 5.10 5.10 255.00

50.00102 3 + 900.00 6.00 0.85 5.10 5.10 255.00

50.00103 3 + 950.00 6.00 0.85 5.10 5.10 255.00

50.00104 4 + 000.00 6.00 0.85 5.10 5.10 255.00

50.00105 4 + 050.00 6.00 0.85 5.10 4.25 21.25

5.00106 4 + 055.00 4.00 0.85 3.40 3.40 28.56

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.1.1

JENIS PEKERJAAN : Lapis Rsap Pengikat

SATUAN PEMBAYARAN : Liter

NO STATION

PANJANG LEBAR PENYERAPAN LUAS VOLUME

KET( M ) ( M ) ( LTR/MTR ) ( X = LTR/M) ( Ltr )

RATA2 ( LTR/M )

8.40107 4 + 063.40 4.00 0.85 3.40 4.25 155.55

36.60108 4 + 100.00 6.00 0.85 5.10 5.10 255.00

50.00109 4 + 150.00 6.00 0.85 5.10 5.10 255.00

50.00110 4 + 200.00 6.00 0.85 5.10 5.10 255.00

50.00111 4 + 250.00 6.00 0.85 5.10 5.10 255.00

50.00112 4 + 300.00 6.00 0.85 5.10 5.10 255.00

50.00113 4 + 350.00 6.00 0.85 5.10 5.10 255.00

50.00114 4 + 400.00 6.00 0.85 5.10 5.10 255.00

50.00115 4 + 450.00 6.00 0.85 5.10 5.10 255.00

50.00116 4 + 500.00 6.00 0.85 5.10 5.10 255.00

50.00117 4 + 550.00 6.00 0.85 5.10 5.10 255.00

50.00118 4 + 600.00 6.00 0.85 5.10 5.10 255.00

50.00119 4 + 650.00 6.00 0.85 5.10 5.10 255.00

50.00120 4 + 700.00 6.00 0.85 5.10 5.10 255.00

50.00121 4 + 750.00 6.00 0.85 5.10 5.10 255.00

50.00122 4 + 800.00 6.00 0.85 5.10 5.10 255.00

50.00123 4 + 850.00 6.00 0.85 5.10 5.10 255.00

50.00124 4 + 900.00 6.00 0.85 5.10 5.10 255.00

50.00125 4 + 950.00 6.00 0.85 5.10 5.10 255.00

50.00126 5 + 000.00 6.00 0.85 5.10 5.10 255.00

50.00127 5 + 050.00 6.00 0.85 5.10 5.10 255.00

50.00128 5 + 100.00 6.00 0.85 5.10 5.10 255.00

50.00129 5 + 150.00 6.00 0.85 5.10 5.10 255.00

50.00130 5 + 200.00 6.00 0.85 5.10 5.10 255.00

50.00131 5 + 250.00 6.00 0.85 5.10 5.10 255.00

50.00132 5 + 300.00 6.00 0.85 5.10 5.10 255.00

50.00133 5 + 350.00 6.00 0.85 5.10 5.10 255.00

50.00134 5 + 400.00 6.00 0.85 5.10 5.10 255.00

50.00135 5 + 450.00 6.00 0.85 5.10 5.10 255.00

50.00136 5 + 500.00 6.00 0.85 5.10 5.10 255.00

50.00137 5 + 550.00 6.00 0.85 5.10 5.10 255.00

50.00138 5 + 600.00 6.00 0.85 5.10 5.10 255.00

50.00139 5 + 650.00 6.00 0.85 5.10 5.10 255.00

50.00140 5 + 700.00 6.00 0.85 5.10 5.10 255.00

50.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.1.1

JENIS PEKERJAAN : Lapis Rsap Pengikat

SATUAN PEMBAYARAN : Liter

NO STATION

PANJANG LEBAR PENYERAPAN LUAS VOLUME

KET( M ) ( M ) ( LTR/MTR ) ( X = LTR/M) ( Ltr )

RATA2 ( LTR/M )

141 5 + 750.00 6.00 0.85 5.10 5.10 255.00 50.00

142 5 + 800.00 6.00 0.85 5.10 5.10 255.00 50.00

143 5 + 850.00 6.00 0.85 5.10 5.10 255.00 50.00

144 5 + 900.00 6.00 0.85 5.10 5.10 255.00 50.00

145 5 + 950.00 6.00 0.85 5.10 5.10 255.00 50.00

146 6 + 000.00 6.00 0.85 5.10 5.10 255.00 50.00

147 6 + 050.00 6.00 0.85 5.10 5.10 255.00 50.00

148 6 + 100.00 6.00 0.85 5.10 5.10 255.00 50.00

149 6 + 150.00 6.00 0.85 5.10 5.10 255.00 50.00

150 6 + 200.00 6.00 0.85 5.10 5.10 255.00 50.00

151 6 + 250.00 6.00 0.85 5.10 5.10 255.00 50.00

152 6 + 300.00 6.00 0.85 5.10 5.10 255.00 50.00

153 6 + 350.00 6.00 0.85 5.10 5.10 255.00 50.00

154 6 + 400.00 6.00 0.85 5.10 5.10 255.00 50.00

155 6 + 450.00 6.00 0.85 5.10 5.10 255.00 50.00

156 6 + 500.00 6.00 0.85 5.10 5.10 255.00 50.00

157 6 + 550.00 6.00 0.85 5.10 5.10 255.00 50.00

158 6 + 600.00 6.00 0.85 5.10 5.10 255.00 50.00

159 6 + 650.00 6.00 0.85 5.10 5.10 255.00 50.00

160 6 + 700.00 6.00 0.85 5.10 5.10 255.00 50.00

161 6 + 750.00 6.00 0.85 5.10 5.10 255.00 50.00

162 6 + 800.00 6.00 0.85 5.10 5.10 255.00 50.00

163 6 + 850.00 6.00 0.85 5.10 5.10 255.00 50.00

164 6 + 900.00 6.00 0.85 5.10 5.10 255.00 50.00

165 6 + 950.00 6.00 0.85 5.10 5.10 255.00 50.00

166 7 + 000.00 6.00 0.85 5.10 5.10 255.00 50.00

167 7 + 050.00 6.00 0.85 5.10 5.10 255.00 50.00

168 7 + 100.00 6.00 0.85 5.10 5.10 255.00 50.00

169 7 + 150.00 6.00 0.85 5.10 5.10 255.00 50.00

170 7 + 200.00 6.00 0.85 5.10 5.10 255.00 50.00

171 7 + 250.00 6.00 0.85 5.10 5.10 255.00 50.00

172 7 + 300.00 6.00 0.85 5.10 5.10 255.00 50.00

173 7 + 350.00 6.00 0.85 5.10 5.10 255.00 50.00

174 7 + 400.00 6.00 0.85 5.10 5.10 255.00 50.00

175 7 + 450.00 6.00 0.85 5.10 5.10 255.00 50.00

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.1.1

JENIS PEKERJAAN : Lapis Rsap Pengikat

SATUAN PEMBAYARAN : Liter

NO STATION

PANJANG LEBAR PENYERAPAN LUAS VOLUME

KET( M ) ( M ) ( LTR/MTR ) ( X = LTR/M) ( Ltr )

RATA2 ( LTR/M )

176 7 + 500.00 6.00 0.85 5.10 5.10 255.00 50.00

177 7 + 550.00 6.00 0.85 5.10 5.10 255.00 50.00

178 7 + 600.00 6.00 0.85 5.10 5.10 255.00 50.00

179 7 + 650.00 6.00 0.85 5.10 5.10 153.00 30.00

180 7 + 680.00 6.00 0.85 5.10 5.10 102.00 20.00

181 7 + 700.00 6.00 0.85 5.10 5.10 255.00 50.00

182 7 + 750.00 6.00 0.85 5.10 5.10 255.00 50.00

183 7 + 800.00 6.00 0.85 5.10 5.10 255.00 50.00

184 7 + 850.00 6.00 0.85 5.10 5.10 255.00 50.00

185 7 + 900.00 6.00 0.85 5.10 5.10 255.00 50.00

186 7 + 950.00 6.00 0.85 5.10 5.10 255.00 50.00

187 8 + 000.00 6.00 0.85 5.10 4.25 63.75 15.00

188 8 + 015.00 4.00 0.85 3.40 3.40 17.00 5.00

189 8 + 020.00 4.00 0.85 3.40 4.25 127.50 30.00

190 8 + 050.00 6.00 0.85 5.10 5.10 255.00 50.00

191 8 + 100.00 6.00 0.85 5.10 5.10 255.00 50.00

192 8 + 150.00 6.00 0.85 5.10 5.10 255.00 50.00

193 8 + 200.00 6.00 0.85 5.10 5.10 255.00 50.00

194 8 + 250.00 6.00 0.85 5.10 5.10 255.00 50.00

195 8 + 300.00 6.00 0.85 5.10 5.10 255.00 50.00

196 8 + 350.00 6.00 0.85 5.10 5.10 255.00 50.00

197 8 + 400.00 6.00 0.85 5.10 5.10 255.00 50.00

198 8 + 450.00 6.00 0.85 5.10 5.10 255.00 50.00

199 8 + 500.00 6.00 0.85 5.10 5.10 255.00 50.00

200 8 + 550.00 6.00 0.85 5.10 5.10 255.00 50.00

201 8 + 600.00 6.00 0.85 5.10 5.10 255.00 50.00

202 8 + 650.00 6.00 0.85 5.10 5.10 255.00 50.00

203 8 + 700.00 6.00 0.85 5.10 5.10 255.00 50.00

204 8 + 750.00 6.00 0.85 5.10 5.10 255.00 50.00

205 8 + 800.00 6.00 0.85 5.10 5.10 255.00 50.00

206 8 + 850.00 6.00 0.85 5.10 5.10 255.00 50.00

207 8 + 900.00 6.00 0.85 5.10 5.10 255.00 50.00

208 8 + 950.00 6.00 0.85 5.10 5.10 255.00 50.00

209 9 + 000.00 6.00 0.85 5.10 -

JUMLAH 44,805.5

BACK UP DATA PENGGUNA JASA : PERENCANAAN TEKNIS JALAN DAN JEMBATAN NO. PAKET KONTRAK : PR - JLJB/20/2013 NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 6.1.2

JENIS PEKERJAAN : Lapis Perekat

SATUAN PEMBAYARAN : Liter

NO STATIONPANJANG LEBAR PENYERAPAN LUAS VOLUME

KET( M ) ( M ) ( LTR/MTR ) ( X = LTR/M) ( Ltr ) RATA2

( LTR/M )

50.00 5.10 255.00 191 8 + 100.00 6.00 0.85 5.10

50.00 5.10 255.00 192 8 + 150.00 6.00 0.85 5.10

50.00 5.10 255.00 193 8 + 200.00 6.00 0.85 5.10

50.00 5.10 255.00 194 8 + 250.00 6.00 0.85 5.10

50.00 5.10 255.00 195 8 + 300.00 6.00 0.85 5.10

50.00 5.10 255.00 196 8 + 350.00 6.00 0.85 5.10

50.00 5.10 255.00 197 8 + 400.00 6.00 0.85 5.10

50.00 5.10 255.00 198 8 + 450.00 6.00 0.85 5.10

50.00 5.10 255.00 199 8 + 500.00 6.00 0.85 5.10

50.00 5.10 255.00 200 8 + 550.00 6.00 0.85 5.10

50.00 5.10 255.00 201 8 + 600.00 6.00 0.85 5.10

50.00 5.10 255.00 202 8 + 650.00 6.00 0.85 5.10

50.00 5.10 255.00 203 8 + 700.00 6.00 0.85 5.10

50.00 5.10 255.00 204 8 + 750.00 6.00 0.85 5.10

50.00 5.10 255.00 205 8 + 800.00 6.00 0.85 5.10

50.00 5.10 255.00 206 8 + 850.00 6.00 0.85 5.10

50.00 5.10 255.00 207 8 + 900.00 6.00 0.85 5.10

50.00 5.10 255.00 208 8 + 950.00 6.00 0.85 5.10

50.00 5.10 255.00 209 9 + 000.00 6.00 0.85 5.10

JUMLAH 36,634.1

0 0 1

50 50 2

50 100 3

50 150 4

50 200 5

50 250 6

50 300 7

50 350 8

50 400 9

50 450 10

50 500 11

50 550 12

50 600 13

50 650 14

50 700 15

50 750 16

50 800 17

50 850 18

50 900 19

50 950 20

50 1000 21

50 1050 22

50 1100 23

50 1150 24

50 1200 25

50 1250 26

50 1300 27

50 1350 28

50 1400 29

50 1450 30

50 1500 31

50 1550 32

50 1600 33

50 1650 34

50 1700 35

50 1750 36

50 1800 37

50 1850 38

50 1900 39

50 1950 40

50 2000 41

50 2050 42

50 2100 43

50 2150 44

50 2200 45

50 2250 46

50 2300 47

50 2350 48

50 2400 49

50 2450 50

50 2500 51

50 2550 52

50 2600 53

50 2650 54

50 2700 55

50 2750 56

50 2800 57

50 2850 58

50 2900 59

25 2925 60

25 2950 61

50 3000 62

50 3050 63

50 3100 64

50 3150 65

50 3200 66

50 3250 67

50 3300 68

50 3350 69

50 3400 70

50 3450 71

50 3500 72

50 3550 73

50 3600 74

50 3650 75

50 3700 76

27 3727 77

50 3777 78

50 3827 79

50 3877 80

30 3907 81

30 3937 82

30 3967 83

30 3997 84

50 4047 85

50 4097 86

50 4147 87

35 4182 88

35 4217 89

50 4267 90

50 4317 91

50 4367 92

50 4417 93

50 4467 94

50 4517 95

50 4567 96

50 4617 97

50 4667 98

50 4717 99

50 4767 100

50 4817 101

50 4867 102

50 4917 103

50 4967 104

50 5017 105

50 5067 106

50 5117 107

50 5167 108

50 5217 109

50 5267 110

50 5317 111

50 5367 112

25 5392 113

25 5417 114

50 5467 115

50 5517 116

50 5567 117

50 5617 118

50 5667 119

50 5717 120

50 5767 121

50 5817 122

50 5867 123

50 5917 124

50 5967 125

50 6017 126

50 6067 127

50 6117 128

50 6167 129

50 6217 130

50 6267 131

50 6317 132

50 6367 133

50 6417 134

50 6467 135

50 6517 136

30 6547 137

30 6577 138

50 6627 139

50 6677 140

50 6727 141

50 6777 142

50 6827 143

50 6877 144

50 6927 145

55 6982 146

50 7032 147

50 7082 148

50 7132 149

70 7202 150

50 7252 151

50 7302 152

50 7352 153

50 7402 154

50 7452 155

50 7502 156

50 7552 157

50 7602 158

50 7652 159

50 7702 160

50 7752 161

60 7812 162

45 7857 163

50 7907 164

50 7957 165

50 8007 166

50 8057 167

25 8082 168

50 8132 169

50 8182 170

50 8232 171

50 8282 172

35 8317 173

50 8367 174

50 8417 175

50 8467 176

50 8517 177

20 8537 178

30 8567 179

50 8617 180

50 8667 181

50 8717 182

50 8767 183

50 8817 184

50 8867 185

25 8892 186

25 8917 187

50 8967 188

50 9017 189

50 9067 190

50 9117 191

25 9142 192

40 9182 193

50 9232 194

50 9282 195

50 9332 196

50 9382 197

50 9432 198

50 9482 199

50 9532 200

50 9582 201

25 9607 202

50 9657 203

50 9707 204

50 9757 205

50 9807 206

50 9857 207

50 9907 208

35 9942 209

50 9992 210

50 10042 211

50 10092 212

50 10142 213

50 10192 214

50 10242 215

50 10292 216

50 10342 217

50 10392 218

25 10417 219

50 10467 220

25 10492 221

25 10517 222

50 10567 223

60 10627 224

50 10677 225

50 10727 226

50 10777 227

50 10827 228

50 10877 229

50 10927 230

50 10977 231

50 11027 232

50 11077 233

50 11127 234

50 11177 235

50 11227 236

50 11277 237

30 11307 238

20 11327 239

50 11377 240

25 11402 241

25 11427 242

50 11477 243

50 11527 244

40 11567 245

50 11617 246

50 11667 247

50 11717 248

50 11767 249

50 11817 250

50 11867 251

50 11917 252

30 11947 253

50 11997 254

50 12047 255

50 12097 256

50 12147 257

50 12197 258

50 12197 259

50 12297 260

50 12347 261

50 12397 262

50 12447 263

50 12497 264

50 12547 265

50 12597 266

50 12647 267

20 12667 268

50 12717 269

50 12767 270

50 12817 271

50 12867 272

50 12917 273

50 12967 274

50 13017 275

25 13042 276

50 13092 277

50 13142 278

50 13192 279

25 13217 280

50 13267 281

25 13292 282

25 13317 283

50 13367 284

50 13417 285

30 13447 286

50 13497 287

50 13547 288

50 13597 289

50 13647 290

50 13697 291

50 13747 292

20 13767 293

20 13787 294

50 13837 295

50 13887 296

50 13937 297

60 13997 298

20 14017 299

50 14067 300

50 14117 301

50 14167 302

50 14217 303

50 14267 304

50 14317 305

40 14357 306

50 14407 307

50 14457 308

50 14507 309

50 14557 310

50 14607 311

50 14657 312

30 14687 313

50 14737 314

50 14787 315

20 14807 316

50 14857 317

50 14907 318

50 14957 319

50 15007 320

50 15057 321

50 15107 322

50 15157 323

50 15207 324

50 15257 325

50 15307 326

50 15357 327

50 15407 328

50 15457 329

50 15507 330

50 15557 331

50 15607 332

50 15657 333

50 15707 334

40 15747 335

70077835

67 97

56 107

657 657

688

BACK UP DATA

KEGIATAN : PERENCANAAN TEKNIS JALAN DAN JEMBATAN

NO. PAKET KONTRAK : PR - JLJB/20/2013

NAMA PAKET : PERENCANAAN TEKNIS JALAN WILAYAH - 6

PROP/KAB/KODYA : ACEH / ACEH SELATAN

ITEM PEMBAYARAN NO : 2.1

JENIS PEKERJAAN : Galian Untuk Drainase, Saluran

SATUAN PEMBAYARAN : M3

NO STATIONPANJANG GALIAN SAL SALURAN PASIR URUG

KET.

( M ) ( M2 ) ( M2 ) ( M2 ) ( M2 ) ( M2 ) ( M2 )

1 22 + 770.00 - - - 0.22 0.94 0.22 50.00

2 22 + 820.00 1.43 - 1.39 1.92 1.67 0.47 50.00

3 22 + 870.00 - 1.98 - 1.87 5.40 0.54 50.00

4 22 + 920.00 - 2.76 - 1.92 4.20 0.65 50.00

5 22 + 970.00 1.73 7.30 1.39 1.69 2.70 0.77 50.00

6 23 + 020.00 - 0.44 - 0.34 0.57 50.00

7 23 + 070.00 - - - 1.30 12.70 0.36 50.00

8 23 + 120.00 1.73 6.60 1.09 2.30 - 0.20 50.00

9 23 + 170.00 1.73 1.23 1.09 1.45 3.16 0.29 50.00

10 23 + 220.00 - 2.70 2.30 2.46 0.21 50.00

11 23 + 270.00 1.73 1.07 1.09 1.45 3.85 0.29 50.00

12 23 + 320.00 - 2.10 0.80 4.08 0.78 50.00

13 23 + 370.00 - 3.60 0.90 3.56 0.30 50.00

14 23 + 420.00 - 1.90 3.84 0.29 50.00

15 23 + 470.00 - 2.40 0.90 3.70 0.15 50.00

16 23 + 520.00 1.73 2.80 1.09 0.85 3.20 0.25 50.00

17 23 + 570.00 1.73 2.46 1.09 2.96 1.89 0.37 50.00

18 23 + 620.00 - 0.84 0.85 2.79 0.25 50.00

19 23 + 670.00 1.73 - 1.09 1.90 4.73 0.15 50.00

20 23 + 720.00 1.73 5.69 1.09 0.85 3.89 0.15 50.00

21 23 + 770.00 3.46 - 2.18 - 2.70 0.15 50.00

22 23 + 820.00 3.46 0.73 2.18 2.67 0.25 50.00

23 23 + 870.00 3.46 1.17 2.18 0.85 4.27 0.29 50.00

24 23 + 920.00 1.43 1.20 1.09 5.57 0.15 50.00

25 23 + 970.00 1.73 0.57 1.09 0.85 2.42 0.25 50.00

26 24 + 020.00 1.73 1.98 1.09 1.30 4.17 0.39 50.00

27 24 + 070.00 1.73 1.55 1.09 1.70 2.78 0.35 50.00

28 24 + 120.00 1.73 2.15 1.09 1.90 8.66 0.44 50.00

29 24 + 170.00 1.73 1.93 1.09 1.30 5.99 0.29 50.00

30 24 + 220.00 1.73 4.06 1.09 2.30 3.47 0.39 50.00

31 24 + 270.00 1.73 2.36 1.09 4.58 0.44 50.00

32 24 + 320.00 1.73 10.25 1.09 0.60 - 0.15 50.00

33 24 + 370.00 1.73 12.31 1.09 - - 0.15 50.00

34 24 + 420.00 - 1.79 1.30 4.94 0.39 50.00

35 24 + 470.00 1.73 3.65 1.09 - 1.71 0.15 50.00

36 24 + 520.00 3.46 2.75 2.18 0.85 0.88 0.25 50.00

37 24 + 570.00 3.46 9.74 2.18 0.80 - 0.15 50.00

GALIAN BIASA

TALUD / PASANGAN

BATU

TIMBUNAN BIASA

38 24 + 620.0050.00

3.46 10.08 2.18 - - 0.15 50.00

39 24 + 670.0050.00

3.46 3.70 2.18 - - 0.15 50.00

40 24 + 720.00 3.46 18.39 2.18 0.90 - 0.15 50.00

41 24 + 770.00 3.46 13.93 2.18 - - 0.15 50.00

42 24 + 820.00 3.46 3.80 2.18 - 2.82 0.15 50.00

43 24 + 870.00 3.46 3.28 2.18 - - 0.15 50.00

44 24 + 920.00 3.46 12.57 2.18 0.85 0.83 0.25 50.00

45 24 + 970.00 3.46 3.90 2.18 0.40 0.15 50.00

46 25 + 020.00 3.46 1.16 2.18 - 0.31 0.15 50.00

47 25 + 070.00 3.46 12.73 2.18 1.45 1.51 0.29 50.00

48 25 + 120.00 3.46 9.01 2.18 1.96 3.35 0.32 50.00

49 25 + 170.00 3.46 2.93 2.18 - - 0.15 50.00

50 25 + 220.00 3.46 14.10 2.18 - - 0.15 50.00

51 25 + 270.00 3.46 15.73 2.18 - 0.55 50.00

52 25 + 320.00 3.46 15.48 2.18 1.50 - 0.15 50.00

53 25 + 370.00 3.46 14.42 2.18 - - 0.15 50.00

54 25 + 420.00 3.46 3.37 2.18 10.48 0.41 50.00

55 25 + 470.00 3.46 6.46 2.18 0.96 - 0.37 50.00

56 25 + 520.00 3.46 8.73 2.18 0.85 1.06 0.25 50.00

57 25 + 570.00 3.46 0.96 2.18 - 2.04 0.15 50.00

58 25 + 620.00 3.46 17.13 2.18 1.92 - 0.67 50.00

59 25 + 670.00 3.46 6.40 2.18 1.96 2.91 0.32 50.00

60 25 + 720.00 3.46 13.65 2.18 - - 0.15 50.00

61 25 + 770.00 3.46 1.89 2.18 1.60 2.67 0.15 50.00

62 25 + 820.00 - 2.42 - 1.81 6.70 0.42 50.00

63 25 + 870.00 - 12.32 - 1.91 - 0.50 50.00

64 25 + 920.00 - 5.79 1.09 0.85 1.04 0.25 50.00

65 25 + 970.00 2.86 2.68 2.18 4.91 0.47 50.00

66 26 + 020.00 3.46 8.73 2.18 - - 0.15 50.00

67 26 + 070.00 3.46 10.04 2.18 1.80 - 0.15 50.00

68 26 + 120.00 3.46 12.41 2.18 - - 0.15 50.00

69 26 + 170.00 3.46 10.26 2.18 0.96 9.35 0.15 50.00

70 26 + 220.00 3.46 2.67 2.18 1.96 21.65 0.54 50.00

71 26 + 270.00 3.46 2.09 2.18 0.10 28.29 0.51 50.00

72 26 + 320.00 3.46 6.25 2.18 0.13 16.08 0.84 50.00

73 26 + 370.00 3.46 2.61 2.18 0.07 8.65 0.50 50.00

74 26 + 420.00 3.46 1.58 2.18 - 1.25 0.15 50.00

75 26 + 470.00 3.46 1.77 2.18 2.81 8.58 0.42 50.00

76 26 + 520.00 3.46 2.26 2.18 - 0.63 0.15 50.00

77 26 + 570.00 3.46 1.63 2.18 0.30 6.80 0.37 50.00

78 26 + 620.00 3.46 3.98 2.18 1.96 3.84 0.32 50.00

79 26 + 670.00 3.46 1.68 2.18 1.96 7.91 0.32 50.00

80 26 + 720.00 3.46 - 2.18 - 1.84 0.15 50.00

81 26 + 770.00 3.46 2.68 2.18 1.45 2.36 0.29 50.00

82 26 + 820.00 3.46 11.29 2.18 - - 0.15 50.00

83 26 + 870.00 3.46 1.47 2.18 1.70 2.65 6.35 50.00

84 26 + 920.00 3.46 - 2.18 - 2.14 0.15 50.00

85 26 + 970.00 3.46 5.45 2.18 - 0.50 0.15 50.00

86 27 + 020.00 3.46 11.19 2.18 0.85 0.30 0.25 50.00

87 27 + 070.00 3.46 1.59 2.18 1.70 2.64 0.35

87 27 + 070.0050.00

3.46 1.59 2.18 1.70 2.64 0.35

88 27 + 120.00 3.46 8.76 2.18 1.96 3.60 0.41 50.00

89 27 + 170.00 3.46 13.16 2.18 1.96 3.07 0.32 50.00

90 27 + 220.00 3.46 10.52 2.18 4.99 0.37 50.00

91 27 + 270.00 3.46 5.87 2.18 1.96 3.87 0.32 50.00

92 27 + 320.00 3.46 12.83 2.18 1.96 3.14 0.32 50.00

93 27 + 370.00 3.46 10.94 2.18 2.96 3.89 0.37 50.00

94 27 + 420.00 3.46 3.69 2.18 0.96 5.63 0.37 50.00

95 27 + 470.00 3.46 9.61 2.18 2.96 4.23 0.37 43.00

96 27 + 513.00 3.46 16.52 2.18 2.96 2.83 0.37 25.00

97 27 + 538.00 3.46 14.10 2.18 3.83 0.41 32.00

98 27 + 570.00 3.46 19.10 2.18 3.32 1.41 50.00

99 27 + 620.00 3.46 14.86 2.18 1.45 2.22 0.29 50.00

100 27 + 670.00 3.46 11.73 2.18 0.02 5.81 0.41 50.00

101 27 + 720.00 3.46 10.60 2.18 11.79 0.58 50.00

102 27 + 770.00 3.46 6.20 2.18 1.96 7.66 0.32