  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    1/58

    A PEKERJAAN PERSIAPAN

    I PEKERJAAN PERSIAPAN Rp.

    Rp.

    B PEKERJAAN STRUKTUR NON STANDAR

    I PEKERJAAN PONDASI PANCANG Rp.

    Rp.

    C PEKERJAAN STRUKTUR STANDAR

    I PEKERJAAN TANAH Rp.

    II PEKERJAAN STRUKTUR BAWAH Rp.

    III PEKERJAAN STRUKTUR ATAS

    III.1 LANTAI SATU Rp.

    III.2 LANTAI DUA Rp.

    III.3 LANTAI TIGA Rp.

    III.4 LANTAI DAK Rp.III.5 KUDA KUDA BAJA Rp.

    Rp.

    D PEKERJAAN ARSITEKTUR

    I PEKERJAAN LANTAI 1 Rp.

    II PEKERJAAN LANTAI 2 Rp.

    III PEKERJAAN LANTAI 3 Rp.

    IV PEKERJAAN LANTAI DAK Rp.

    Rp.

    E PEKERJAAN MEKANIKAL & ELEKTRIKAL

    I DIVISI A.0. PEKERJAAN MEKANIKAL Rp.

    II DIVISI B.0. PEKERJAAN ELEKTRIKAL Rp.

    Rp.

    F PEKERJAAN SITE DEVELOPMENT

    I PEKERJAAN BANGUNAN PENUNJANG Rp.

    II PEKERJAAN JALAN DAN TAMAN Rp.

    Rp.

    Rp.

    PPN 10% Rp.

    JUMLAH + PPN Rp.

    DIBULATKAN Rp.

    Bandung,2015

    , 2016

    Penawar

    .

    JUMLAH B

    REKAPITULASI

    Terbilang :

    JUMLAH

    JUMLAH A

    JUMLAH C

    PEKERJAAN PEMBANGUNAN GEDUNG KANTOR BALAI PSDA Ws. CITARUM

    JL. SMK 6 - SOEKARNO HATTA - KOTA BANDUNG

    TAHUN 2016

    NO URAIAN PEKERJAAN JUMLAH

    JUMLAH D

    JUMLAH E

    JUMLAH F

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    2/58

    Harga Satuan Jumlah Harga

    (Rp.) (Rp.)

    1 3 4 5 6

    A PEKERJAAN PERSIAPAN

    I PEKERJAAN PERSIAPAN

    1.1 Papan nama proyek unit 1.00

    1.2 Pekerjaan pengukuran dan pasang bouwplank m' 136.85

    1.3 Pek. test bahan & material ls 1.00

    1.4 Penyediaan Listrik dan air kerja selama pelaksanaan bln 6.00

    1.5 Dokumentasi, administrasi, shop drawing & asbuilt. ls 1.00

    1.6 Pekerjaan kantor direksi m 36.00

    1.7 Los kerja dan gudang m 16.00

    1.8 Pagar sementara dari seng gelombang tinggi 1,8 m m 171.50

    1.9 Asuransi (Astek, Car & TPL) ls 1.00

    1.10 Pek. Perijinan ls 1.00

    1.11 Pekerjaan anti rayap (termite control) m 727.75

    Jumlah A -

    2

    0

    PEKERJAAN PEMBANGUNAN GEDUNG KANTOR BALAI PSDA Ws. CITARUM

    JL. SMK 6 - SOEKARNO HATTA - KOTA BANDUNG

    TAHUN 2016

    No. Uraian Pekerjaan Satuan Volume

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    3/58

    PEKERJAAN STRUKTUR

    NO SAT VOL HARGA SAT JUMLAH

    B. PEKERJAAN NON STANDAR

    PEKERJAAN PONDASI

    PEKERJAAN PONDASI PANCANG

    1 Pemancangan Tiang Pancang uk. 25 x 25 cm Hydrolic m 1,800.00- termasuk biaya handling dan sambungan

    2 Pengadaan Tiang Pancang uk. 25 x 25 cm m 1,800.00

    3 Mobilisasi dan demobilisasi alat pancang Hydrolic ls 1.00

    4 Pek. Bobokan Tiang Pancang titik 120.00

    5 Test PDA titik 3.00

    JUMLAH PEKERJAAN PONDASI

    C. PEKERJAAN STANDAR (Kontrak Lumpsum)

    I PEKERJAAN TANAH

    1 Galian Tanah Pile Cap m3 107.87

    2 Urugan Kembali Bekas Galian m3 107.87

    3 Pek. Urugan Tanah Dari Luar Peninggian peil Bangunan (h = 60 cm) m3 627.00

    4 Pek. Pemadatan m2 1,045.00

    JUMLAH PEKERJAAN TANAH

    II PEKERJAAN STRUKTUR BAWAH

    1 Pekerjaan Pile cap P5

    Beton K - 300 m3 25.99

    Besi D16-160 (1.578 Kg/m) kg 1,312.78

    Besi D13-180 (1.042 Kg/m) kg 775.35

    Besi peminggang 1 D13 (1.042 Kg/m) kg 62.50

    Bekisting pas. Bata 1: 5 m2 54.72

    Lantai Kerja 5 cm m3 2.17

    Urugan pasir 10 cm m3 4.33

    2 Pekerjaan Pile cap P4

    Beton K - 300 m3 14.85

    Besi D16-160 (1.578 Kg/m) kg 823.70

    Besi D13-180 (1.042 Kg/m) kg 487.68

    Besi peminggang 1 D13 (1.042 Kg/m) kg 48.13

    Bekisting pas. Bata 1: 5 m2 39.60

    Lantai Kerja 5 cm m3 1.24

    Urugan pasir 10 cm m3 2.48

    3 Pekerjaan Pile cap P3

    Beton K - 300 m3 3.65

    Besi D16-160 (1.578 Kg/m) kg 202.55

    Besi D13-180 (1.042 Kg/m) kg 119.92

    Besi peminggang 1 D13 (1.042 Kg/m) kg 11.83

    Bekisting pas. Bata 1: 5 m2 9.74

    Lantai Kerja 5 cm m3 0.30

    Urugan pasir 10 cm m3 0.61

    4 Pekerjaan Pile cap P2

    Beton K - 300 m3 0.90

    Besi D16-160 (1.578 Kg/m) kg 91.18

    Besi D13-180 (1.042 Kg/m) kg 54.18Besi peminggang 1 D13 (1.042 Kg/m) kg 8.33

    Bekisting pas. Bata 1: 5 m2 7.20

    Lantai Kerja 5 cm m3 0.08

    Urugan pasir 10 cm m3 0.15

    0

    PEKERJAAN PEMBANGUNAN GEDUNG KANTOR

    BALAI PSDA WS. CITARUM

    JL. SOEKARNO HATTA NO. BANDUNG

    URAIAN PEKERJAAN

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    4/58

    NO SAT VOL HARGA SAT JUMLAHURAIAN PEKERJAAN

    5 Pek. Tie Beam Type TB.1 (30/60)

    Beton K - 300 m3 40.23

    Besi D16 (1.578 Kg/m) kg 3,214.86

    Besi peminggang 2 10 (0.617 Kg/m) kg 289.09

    sengkang 10 - 150/100 (0.617 Kg/m) kg 1,874.42

    Bekisting pas. Bata 1: 5 m2 268.20

    Lantai Kerja 5 cm m3 3.35

    Urugan pasir 10 cm m3 4.73

    6 Pek. Tie Beam Type TB.2 (25/50)

    Beton K - 300 m3 10.49Besi D16 (1.578 Kg/m) kg 938.73

    sengkang 10 - 150/100 (0.617 Kg/m) kg 579.33

    Bekisting pas. Bata 1: 5 m2 83.88

    Lantai Kerja 5 cm m3 1.05

    Urugan pasir 10 cm m3 2.10

    7 Pek. Tie Beam Type TB.2A (25/50)

    Beton K - 300 m3 0.32

    Besi D16 (1.578 Kg/m) kg 33.35

    sengkang 10 - 150/100 (0.617 Kg/m) kg 17.61

    Bekisting pas. Bata 1: 5 m2 2.55

    Lantai Kerja 5 cm m3 0.03

    Urugan pasir 10 cm m3 0.06

    8 Pek. Plat Lantai Dasar (t=140 mm)

    Beton K - 300 m3 65.49

    Wiremesh M-8 (1 layer) (5,25 Kg/m2) Kg 2,934.70

    Lantai Kerja 5 cm m3 23.39

    Urugan pasir 10 cm m3 46.78

    JUMLAH PEKERJAAN STRUKTUR BAWAH -

    III PEKERJAAN STRUKTUR ATAS

    III.1 LANTAI SATU

    1 Pek. Kolom K.1 (40/40)

    Beton K - 300 m3 19.97

    Besi 8 D16 (1.578 Kg/m) kg 2,035.28

    sengkang 10 - 150/100 (0.617 Kg/m) kg 1,046.66

    Bekisting kolom multipleks 9mm m2 199.68

    2 Pek. Kolom K.2 ( 50)

    Beton K - 300 m3 2.829

    Besi 8 D16 (1.578 Kg/m) kg 293.550

    sengkang 10 - 150/100 (0.617 Kg/m) kg 121.918

    Bekisting kolom multipleks 9mm m2 22.629

    3 Pek. Kolom KT (20/20)

    Beton K - 300 m3 0.168

    Besi 4 D16 (1.578 Kg/m) kg 31.560

    sengkang 10 - 150/100 (0.617 Kg/m) kg 14.512

    Bekisting kolom multipleks 9mm m2 3.360

    4 Pek. Balok Tangga BT (20/30)

    Beton K - 300 m3 0.36

    Besi D16 (1.578 Kg/m) kg 42.92

    sengkang 10 - 150/100 (0.617 Kg/m) kg 26.65

    Bekisting balok multipleks 9mm m2 3.960

    5 Pek. Tangga beton

    Beton K - 300 m3 11.31

    Wiremesh M-8 (2 layer) (5,25 Kg/m2) kg 102.85Bekisting tangga multipleks 9mm m2 36.44

    JUMLAH -

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    5/58

    NO SAT VOL HARGA SAT JUMLAHURAIAN PEKERJAAN

    III.2 LANTAI DUA

    1 Pek. Kolom K.1 (40/40)

    Beton K - 300 m3 17.47

    Besi 8 D16 (1.578 Kg/m) kg 1,626.91

    sengkang 10 - 150/100 (0.617 Kg/m) kg 808.08

    Bekisting kolom multipleks 9mm m2 174.72

    2 Pek. Kolom K.2 ( 50)

    Beton K - 300 m3 2.475

    Besi 8 D16 (1.578 Kg/m) kg 234.650

    sengkang 10 - 150/100 (0.617 Kg/m) kg 94.128Bekisting kolom multipleks 9mm m2 19.800

    3 Pek. Balok Type B.1 (30/60)

    Beton K - 300 m3 41.31

    Besi D16 (1.578 Kg/m) kg 3,505.72

    Besi peminggang 2 10 (0.617 Kg/m) kg 317.09

    sengkang 10 - 150/100 (0.617 Kg/m) kg 2,075.70

    Bekisting balok multipleks 9mm m2 275.40

    4 Pek. Balok Type B.1A (30/60)

    Beton K - 300 m3 2.84

    Besi D16 (1.578 Kg/m) kg 543.02

    Besi peminggang 2 10 (0.617 Kg/m) kg 39.65

    sengkang 10 - 150/100 (0.617 Kg/m) kg 162.28

    Bekisting balok multipleks 9mm m2 18.90

    5 Pek. Balok Type B.2 (25/50)

    Beton K - 300 m3 11.39

    Besi D16 (1.578 Kg/m) kg 1,148.04

    sengkang 10 - 150/100 (0.617 Kg/m) kg 629.10

    Bekisting balok multipleks 9mm m2 91.09

    6 Pek. Balok Type B.2A (25/50)

    Beton K - 300 m3 0.28

    Besi D16 (1.578 Kg/m) kg 91.83

    sengkang 10 - 150/100 (0.617 Kg/m) kg 15.19

    Bekisting balok multipleks 9mm m2 2.20

    7 Pek. Balok Type B.3 (20/40)

    Beton K - 300 m3 3.03

    Besi D16 (1.578 Kg/m) kg 304.63

    sengkang 10 - 150/100 (0.617 Kg/m) kg 205.45

    Bekisting balok multipleks 9mm m2 30.29

    8 Pek. Pelat Lantai (14 CM)

    Beton K - 300 m3 71.43

    Wiremesh M-8 (2 layer) (5,25 Kg/m2) kg 6,897.65

    Bekisting plat multipleks 9mm m2 510.21

    9 Pek. Kolom KT (20/20)

    Beton K - 300 m3 0.168

    Besi 4 D16 (1.578 Kg/m) kg 31.560

    sengkang 10 - 150/100 (0.617 Kg/m) kg 14.512

    Bekisting kolom multipleks 9mm m2 3.360

    10 Pek. Balok Tangga BT (20/30)

    Beton K - 300 m3 0.36

    Besi D16 (1.578 Kg/m) kg 42.92

    sengkang 10 - 150/100 (0.617 Kg/m) kg 26.65

    Bekisting balok multipleks 9mm m2 3.960

    11 Pek. Tangga beton

    Beton K - 300 m3 11.31Wiremesh M-8 (2 layer) (5,25 Kg/m2) kg 102.85

    Bekisting tangga multipleks 9mm m2 36.44

    JUMLAH -

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    6/58

    NO SAT VOL HARGA SAT JUMLAHURAIAN PEKERJAAN

    III.3 LANTAI TIGA

    1 Pek. Kolom K.1 (40/40)

    Beton K - 300 m3 8.06

    Besi 8 D16 (1.578 Kg/m) kg 750.88

    sengkang 10 - 150/100 (0.617 Kg/m) kg 372.96

    Bekisting kolom multipleks 9mm m2 80.64

    2 Pek. Kolom K.2 ( 50)

    Beton K - 300 m3 2.475

    Besi 8 D16 (1.578 Kg/m) kg 234.650

    sengkang 10 - 150/100 (0.617 Kg/m) kg 94.128Bekisting kolom multipleks 9mm m2 19.800

    3 Pek. Balok Type B.1 (30/60)

    Beton K - 300 m3 41.31

    Besi D16 (1.578 Kg/m) kg 3,505.72

    Besi peminggang 2 10 (0.617 Kg/m) kg 317.09

    sengkang 10 - 150/100 (0.617 Kg/m) kg 2,075.70

    Bekisting balok multipleks 9mm m2 275.40

    4 Pek. Balok Type B.1A (30/60)

    Beton K - 300 m3 2.84

    Besi D16 (1.578 Kg/m) kg 543.02

    Besi peminggang 2 10 (0.617 Kg/m) kg 39.65

    sengkang 10 - 150/100 (0.617 Kg/m) kg 162.28

    Bekisting balok multipleks 9mm m2 18.90

    5 Pek. Balok Type B.2 (25/50)

    Beton K - 300 m3 11.39

    Besi D16 (1.578 Kg/m) kg 1,148.04

    sengkang 10 - 150/100 (0.617 Kg/m) kg 629.10

    Bekisting balok multipleks 9mm m2 91.09

    6 Pek. Balok Type B.2A (25/50)

    Beton K - 300 m3 0.28

    Besi D16 (1.578 Kg/m) kg 91.83

    sengkang 10 - 150/100 (0.617 Kg/m) kg 15.19

    Bekisting balok multipleks 9mm m2 2.20

    7 Pek. Balok Type B.3 (20/40)

    Beton K - 300 m3 3.03

    Besi D16 (1.578 Kg/m) kg 304.63

    sengkang 10 - 150/100 (0.617 Kg/m) kg 205.45

    Bekisting balok multipleks 9mm m2 30.29

    8 Pek. Pelat Lantai (14 CM)

    Beton K - 300 m3 53.09

    Wiremesh M-8 (2 layer) (5,25 Kg/m2) kg 5,126.47

    Bekisting plat multipleks 9mm m2 379.19

    9 Pek. Pelat Lantai (20 CM)

    Beton K - 300 m3 26.20

    Wiremesh M-8 (2 layer) (5,25 Kg/m2) kg 1,771.18

    Bekisting plat multipleks 9mm m2 131.01

    JUMLAH -

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    7/58

    NO SAT VOL HARGA SAT JUMLAHURAIAN PEKERJAAN

    III.4 LANTAI DAK

    1 Pek. Balok Type B.1 (30/60)

    Beton K - 300 m3 13.50

    Besi D16 (1.578 Kg/m) kg 1,145.66

    Besi peminggang 2 10 (0.617 Kg/m) kg 103.62

    sengkang 10 - 150/100 (0.617 Kg/m) kg 678.33

    Bekisting balok multipleks 9mm m2 90.00

    2 Pek. Balok Type B.1A (30/60)

    Beton K - 300 m3 2.84

    Besi D16 (1.578 Kg/m) kg 543.02Besi peminggang 2 10 (0.617 Kg/m) kg 39.65

    sengkang 10 - 150/100 (0.617 Kg/m) kg 162.28

    Bekisting balok multipleks 9mm m2 18.90

    3 Pek. Balok Type B.2 (25/50)

    Beton K - 300 m3 4.26

    Besi D16 (1.578 Kg/m) kg 449.47

    sengkang 10 - 150/100 (0.617 Kg/m) kg 235.42

    Bekisting balok multipleks 9mm m2 34.09

    4 Pek. Balok Type B.3 (20/40)

    Beton K - 300 m3 3.27

    Besi D16 (1.578 Kg/m) kg 279.36

    sengkang 10 - 150/100 (0.617 Kg/m) kg 190.75

    Bekisting balok multipleks 9mm m2 32.68

    5 Pek. Pelat Dak (14 CM)

    Beton K - 300 m3 19.88

    Wiremesh M-8 (2 layer) (5,25 Kg/m2) kg 1,958.22

    Bekisting plat multipleks 9mm m2 142.24

    JUMLAH -

    III.5 KUDA KUDA BAJA

    1 Pek. Kuda kuda Baja

    Kuda kuda WF 300.150.6,5.9 (36,7 kg/m) kg 711.980

    Kuda kuda WF 250.125.6.9 (29,6 kg/m) kg 1,659.97

    Pengkaku WF 200.100.5,5.8 (21,3 kg/m) kg 319.50

    Gording lip chanel 150.75.20.2,3 (5,5 kg/m) kg 980.10

    Sagrod 10 - 1200 (U-24) kg 125.44

    Trekstang 12 (U-40) kg 72.63

    Baseplat 16 mm (129,51 kg/m2) kg 82.89

    Endplat 16 mm (129,51 kg/m2) kg 229.89

    Voute (potongan WF 250.125.6.9) kg 142.08

    Angkur D HTB 16 (L=40 cm) bh 48.00

    Baut HTB D 16 bh 112.00

    Zincromat WF, Lip Chanel, sagrod dan trekstang m2 301.60

    Insulasi atap (Rockwool, double alumunium foil, roofmesh) m2 227.12

    Penutup atap spandeck m2 227.12

    JUMLAH -

    PEKERJAAN STRUKTUR ATAS -

    JUMLAH PEKERJAAN STRUKTUR STANDAR -

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    8/58

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    9/58

    NO URAIAN PEKERJAAN SAT VOL HARGA SAT JUMLAH

    V PEKERJAAN PLAFOND

    1 Pek. Rangka Plafond m2 593.28

    2 Pek. Plafond gypsum T. 9 mm m2 513.99

    3 Pek. List Plafond gypsum m' 395.88

    4 Pek. Plafond gypsum bagian Luar dan area basah m2 79.29

    5 Pek. Acian bawah Tangga m2 31.80

    6 Atap Entrance m2 23.98

    Jumlah

    VI PEKERJAAN SANITAIR1 Pek. Closet Monoblock unit 6.00

    2 Pek. Wastafel Type unit 2.00

    3 Pek. Urinoir Type unit 4.00

    4 Pek. Skat Urinoir bh 4.00

    5 Pek. Kaca cermin m2 1.84

    6 Pek. Kran Type bh 7.00

    7 Pek. Jet washer bh 6.00

    8 Pek. Floor Drain bh 9.00

    9 Pek. Kitchen Zink bh 2.00

    10 Pek. Cubical toilet phenolic resin board unit 6.00

    Jumlah

    VII PEKERJAAN PENGECATAN

    1 Pek. Pengecatan Dinding Interior m2 615.52

    2 Pek. Pengecatan Dinding Exterior m2 331.79

    3 Pek. Pengecatan Kolom m2 166.73

    4 Pek. Pengecatan Plafond Gypsum m2 593.28

    5 Pek. Pengecatan Plafond Expose m2 31.80

    Jumlah

    JUMLAH PEKERJAAN LANTAI I

    II. PEKERJAAN LANTAI II

    I PEKERJAAN BETON PRAKTIS

    1 Pek. Kolom Praktis m1 298.80

    2 Pek. Balok lintel m1 126.10

    3 Pek. Balok praktis dudukan partisi m1 6.87

    4 Meja beton t= 10 cm m3 0.39

    5 Chemical angkur utk kolom praktis gantung ttk 96.00

    Jumlah

    II PEKERJAAN DINDING

    1 Pek. Dinding 1/2 Bata (1 : 5) m2 313.20

    2 Pek. Plesteran dinding (1 : 5) m2 626.40

    3 Pek. Plesteran dinding ban kusen BV (1 : 5) m2 4.54

    4 Pek. Acian Dinding m2 626.40

    5 Pek. Acian kolom m2 166.73

    6 Pek. Acian bawah Tangga m2 31.80

    7 Pek. Keramik dinding 30/60 Toilet R.Kepala Balai & Toilet umum t.3,2 m m2 102.80

    8 Pek. Granit Alam Meja Wastafel m2 1.82

    9 Pek. Partisi double gypsum rangka metal stud m2 44.20

    Jumlah

    III PEKERJAAN LANTAI

    1 Pek. Granite Tile 60/60 m2 106.35

    2 Pek. Plin lantai granite tile 10x60 polished m' 68.80

    3 Pek. Granite Tile 30/60 Tangga + stairnozing m2 22.87

    4 Pek. Keramik Lantai 30/30 Toilet m2 25.73

    5 Pek. Urugan pasir urug (t= 5 cm) m3 6.60

    6 Pek. Lantai kerja pelindung waterproofing dak bagian depan (5cm) m3 0.78

    Jumlah

    IV PEKERJAAN KUSEN PINTU DAN JENDELA

    1 Pek. Kusen dan pintu Type P.3 unit 1.002 Pek. Kusen dan pintu Type P.4 unit 1.00

    3 Pek. Kusen dan pintu Type P.5 unit 3.00

    4 Pek. Kusen dan pintu Type P.6 unit 5.00

    5 Pekerjaan Pintu Shaff unit 1.00

    6 Pek. Kusen Jendela Type J.1 unit 1.00

    7 Pek. Kusen Jendela Type J.1B unit 1.00

    8 Pek. Kusen Jendela Type J.3 unit 1.00

    9 Pek. Kusen Jendela Type J.6 unit 10.00

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    10/58

    NO URAIAN PEKERJAAN SAT VOL HARGA SAT JUMLAH

    10 Pek. Kusen Bouvenlich Type B.2 unit 2.00

    11 Pek. Kusen Bouvenlich Type B.3 unit 2.00

    12 Pek. Jalusi Besi Hollow termasuk pengecatan m2 37.44

    Jumlah

    V PEKERJAAN PLAFOND

    1 Pek. Rangka Plafond m2 132.07

    2 Pek. Plafond gypsum T. 9 mm m2 106.35

    3 Pek. List Plafond gypsum m' 100.28

    4 Pek. Plafond gypsum area toilet m2 25.73Jumlah

    VI PEKERJAAN SANITAIR

    1 Pek. Closet Monoblock unit 7.00

    2 Pek. Wastafel unit 2.00

    3 Pek. Urinoir unit 1.00

    4 Pek. Skat Urinoir bh 4.00

    5 Pek. Kaca cermin m2 2.00

    6 Pek. Kran bh 11.00

    7 Pek. Jet washer bh 7.00

    8 Pek. Floor Drain bh 13.00

    9 Bak. Air lapis keramik bh 1.00

    10 Pek. Cubical toilet phenolic resin board unit 6.00

    Jumlah

    VII PEKERJAAN PENGECATAN

    1 Pek. Pengecatan Dinding Interior m2 254.12

    2 Pek. Pengecatan Dinding Exterior m2 156.60

    3 Pek. Pengecatan Kolom m2 166.73

    4 Pek. Pengecatan Plafond Gypsum m2 157.80

    5 Pek. Pengecatan Plafond Expose m2 -

    6 Pek. Waterproofing membran m2 15.65

    Jumlah

    JUMLAH PEKERJAAN LANTAI II

    III. PEKERJAAN LANTAI III

    I PEKERJAAN BETON PRAKTIS

    1 Pek. Kolom Praktis m1 98.00

    2 Pek. Balok lintel m1 18.39

    3 Pek. Balok praktis dudukan partisi m1

    4 Chemical angkur utk kolom praktis gantung ttk 96.00

    Jumlah

    II PEKERJAAN DINDING

    1 Pek. Dinding 1/2 Bata (1 : 5) m2 173.85

    2 Pek. Plesteran dinding (1 : 5) m2 347.69

    3 Pek. Acian Dinding m2 347.69

    4 Pek. Acian kolom m2 86.09

    Jumlah

    III PEKERJAAN LANTAI

    1 Pek. Granite Tile 60/60 m2

    2 Pek. Granite Tile 30/60 Tangga m2

    3 Pek. Keramik Lantai 30/30 Toilet m2

    4 Pek. Stairnozing Granite Tile 5/30 m'

    5 Pek. Lantai kerja pelindung waterproofing dak lt. 3 dan roof garden (5cm) m3 7.36

    6 Pek. Tribun Ruang Serba Guna m2

    Jumlah

    IV PEKERJAAN KUSEN PINTU DAN JENDELA

    1 Pek. Kusen dan pintu Type P.2 unit

    2 Pek. Kusen Jendela Type J.1 unit

    3 Pek. Kusen Jendela Type J.1B unit 1.00

    4 Pek. Kusen Jendela Type J.3 unit 1.005 Pek. Kusen Jendela Type J.6 unit

    6 Pek. Kusen Jendela Type T unit

    7 Pek. Jalusi Besi Hollow termasuk pengecatan m2

    8 Pek. Hand railling Tangga Pipa O2.5" Stainless m'

    9 Pek. Railling Tangga Pipa O2.5" Stainless m'

    Jumlah

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    11/58

    NO URAIAN PEKERJAAN SAT VOL HARGA SAT JUMLAH

    V PEKERJAAN PLAFOND

    1 Pek. Rangka Plafond m2

    2 Pek. Plafond gypsum T. 9 mm m2

    3 Pek. Plafond Gypsum Aqustik t. 9 mm m2

    4 Pek. List Plafond gypsum m2

    5 Pek. Plafond gypsum bagian Luar m2

    6 Pek. Acian bawah Tangga m2

    7 Atap Entrance m2

    JumlahVI PEKERJAAN SANITAIR

    1 Pek. Closet Monoblock unit

    2 Pek. Wastafel Type unit

    3 Pek. Urinoir Type unit

    4 Pek. Skat Urinoir bh

    5 Pek. Kaca cermin m2

    6 Pek. Kran Type bh

    7 Pek. Floor Drain bh

    8 Pek. Kitchen Zink bh

    9 Kran Kitchen Zink bh

    10 Bak. Fiber bh

    11 Pek. Cubical m2

    Jumlah

    VII PEKERJAAN PENGECATAN

    1 Pek. Pengecatan Dinding Interior m2

    2 Pek. Pengecatan Dinding Exterior m2 173.85

    3 Pek. Pengecatan Kolom m2 86.09

    4 Pek. Pengecatan Plafond Gypsum m2

    5 Pek. Pengecatan Plafond Expose m2

    6 Pek. Waterproofing dak lt. 3 dan roof garden m2 147.22

    Jumlah

    JUMLAH PEKERJAAN LANTAI III

    IV. PEKERJAAN LANTAI DAK

    I PEKERJAAN BETON PRAKTIS

    1 Pek. Kolom Praktis m1 30.00

    2 Pek.Balok praktis m1 75.51

    Jumlah

    II PEKERJAAN DINDING

    1 Pek. Dinding 1/2 Bata (1 : 5) m2 75.51

    2 Pek. Plesteran dinding (1 : 5) m2 151.02

    3 Pek. Acian Dinding m2 151.02

    4 Pek. Acian kolom m2

    5 Pek. Keramik dinding 30/60 m2

    6 Pek. Granit Meja Wastafel m2

    Jumlah

    III PEKERJAAN LANTAI

    1 Pek. Granite Tile 60/60 m2

    2 Pek. Lantai kerja pelindung waterproofing (t=5 cm) m3 18.14

    3 Waterprofing membran m2 362.87

    Jumlah

    IV PEKERJAAN KUSEN PINTU DAN JENDELA

    1 Pek. Kusen dan pintu Besi unit

    Jumlah

    V PEKERJAAN PLAFOND

    1 Pek. Acian Plafond Expose m2

    Jumlah

    VII PEKERJAAN PENGECATAN

    1 Pek. Pengecatan Dinding Interior m22 Pek. Pengecatan Dinding Exterior m2 151.02

    3 Pek. Pengecatan Kolom m2

    4 Pek. Pengecatan Plafond Expose m2

    Jumlah

    JUMLAH PEKERJAAN LANTAI DAK -

    -JUMLAH PEKERJAAN BANGUNAN GEDUNG UTAMA

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    12/58

    Proyek : GEDUNG BALAI PSDA WS. CITARUM

    Lokasi : JL. SOEKARNO HATTA BYPASS - BANDUNG

    Pekerjaan : MEKANIKAL & ELEKTRIKAL

    Tanggal :

    E. PEKERJAAN MEKANIKAL ELEKTRIKAL

    U R A I A N P E K E R J A A N J U M L A H

    TOTAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL Rp.

    SUB TOTAL -Rp.

    PPN 10% -Rp.

    TOTAL -Rp.

    DIBULATKAN -Rp.

    Terbilang :

    RENCANA ANGGARAN BIAYA MEKANIKAL DAN ELEKTRIKAL

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    13/58

    Proyek :

    Lokasi :

    Pekerjaan :

    E. PEKERJAAN MEKANIKAL ELEKTRIKAL

    J U M L A H

    DIVISI A.0. PEKERJAAN MEKANIKAL -Rp.

    DIVISI B.0. PEKERJAAN ELEKTRIKAL -Rp.

    TOTAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL -Rp.

    U R A I A N P E K E R J A A N

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    14/58

    J U M L A H

    SUB REKAPITULASI PEKERJAAN PLUMBING

    DIVISI A.0. PEKERJAAN MEKANIKAL

    Section A.1. Pemipaan Air Kotor, Buangan & Vent -Rp.

    Section A.2. Instalasi Air Bersih -Rp.

    Section A.3. Pekerjaan AC & Exhaust Fan -Rp.

    Section A.4. Pekerjaan Sumur zet pump -Rp.

    TOTAL PEKERJAAN MEKANIKAL -Rp.

    U R A I A N P E K E R J A A N

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    15/58

    No. HARGA SATUAN JUMLAH

    DIVISI A.0. PEKERJAAN MEKANIKAL

    Section A.1. Pemipaan Air Kotor, Buangan & Vent

    A. Pekerjaan Site

    1 Sistem pemipaan :

    Pipa PVC, kelas D 150 mm (inc. galian & urugan) 86.00 m -Rp. -Rp.

    Pipa PVC, kelas D 100 mm (inc. galian & urugan) 72.00 m -Rp. -Rp.

    Pipa PVC, kelas D 50 mm (inc. galian & urugan) 24.00 m -Rp. -Rp.

    2 Bak kontrol 50 x 50 kedalaman rata rata 76 cm 2.00 bh -Rp. -Rp.

    3 Fitting, accessories & material support 1.00 ls -Rp -Rp.

    4 Testing & commissioning 1.00 ls -Rp -Rp.

    B. Lantai - 1

    1 Sistem pemipaan :

    Pipa PVC, kelas D 100 mm 46.00 m -Rp. -Rp.

    Pipa PVC, kelas D 50 mm 52.00 m -Rp. -Rp.

    2 Pipa PVC, kelas D 40 mm 20.00 m -Rp. -Rp.

    3 Clean out (CO 50 mm) 9.00 bh -Rp. -Rp.

    4 Fitting, accessories & material support 1.00 ls -Rp -Rp.

    5 Testing & commissioning 1.00 ls -Rp -Rp.

    C. Lantai - 2

    1 Sistem pemipaan :

    Pipa PVC, kelas D 100 mm 31.00 m -Rp. -Rp.

    Pipa PVC, kelas D 50 mm 36.00 m -Rp. -Rp.

    2 Pipa PVC, kelas D 40 mm 33.00 m -Rp. -Rp.

    3 Clean out (CO 50 mm) 9.00 bh -Rp. -Rp.

    4 Fitting, accessories & material support 1.00 ls -Rp -Rp.

    5 Testing & commissioning 1.00 ls -Rp -Rp.

    D. Lantai - 3

    1 Sistem pemipaan :

    Pipa PVC, kelas D 100 mm m -Rp. -Rp.

    Pipa PVC, kelas D 50 mm m -Rp. -Rp.

    Pipa PVC, kelas D 40 mm m -Rp. -Rp.

    2 Clean out (CO 50 mm) bh -Rp. -Rp.

    3 Vent cap 40 mm bh -Rp. -Rp.

    4 Fitting, accessories & material support ls -Rp -Rp.

    5 Testing & commissioning ls -Rp -Rp.

    E. Pekerjaan Septictank :

    Galian Tanah 6.19 m -Rp -Rp.

    Urugan tanah kembali dan perataan 0.60 m -Rp -Rp.

    Pasir urug, t 10 cm 0.34 m -Rp -Rp.

    Lantai kerja, t : 5 cm 0.20 m -Rp -Rp.

    Beton bertulang 0.46 m -Rp -Rp.

    Tutup manhole 1.00 bh -Rp -Rp.

    Instalasi pemipaan 1.00 ls -Rp -Rp.

    Septictank package, kap : 3,00 m 1.00 unit -Rp -Rp.

    Sub total section A.1. -Rp.

    URAIAN PEKERJAAN VOLUME

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    16/58

    No. URAIAN PEKERJAAN HARGA SATUAN JUMLAH

    Section A.2. Instalasi Air Bersih

    A Sistem Distribusi :

    1a Pompa distribusi : type submersible 2.00 unit -Rp. -Rp.

    Kapasitas : 2 x 280 lpm, Head : 40 mAq

    power : 3.7 kw/3Ph/220v/50Hz (1 standby)

    ~ Accessories :

    * 1 unit control panel in steel cabinet * 2 unit manifold made of galvanize pipe

    * 2 unit non return valve

    * 4 unit isolating valve

    * 1 unit pressure sensor & 1 unit pressure gauge

    * 1 unit membran tank

    * Power cable motor to control panel

    1b Valve :

    Gate valve (F/F) 50 mm 4.00 unit -Rp. -Rp.

    Check valve (F/F) 50 mm 4.00 unit -Rp. -Rp.

    Strainer (F/F) 50 mm 4.00 unit -Rp. -Rp.

    Flexible connection 50 mm 4.00 unit -Rp. -Rp.

    1d Fitting, accessories & material support 1.00 ls -Rp. -Rp.

    1e Testing & commissioning 1.00 ls -Rp. -Rp.

    2 Pompa booster : 1.00 unit -Rp. -Rp.

    Kapasitas 75 ltr/mnt

    Head 20 mAq

    Motor output 1.0 kW

    Type : Vertikal

    Termasuk pressure tank

    3 Roof tank FRP panel system c/w : 1.00 unit -Rp. -Rp.

    Kapasitas : 12 m (3 x 2 x 2) m

    Steel base UNP

    Manhole, tangga luar & dalam

    Inlet, outlet, drain & connection

    3a Sistem pemipaan (PP-R PN10) :

    Pipa PP-R 65 mm 75.00 m -Rp. -Rp.

    Pipa PP-R 50 mm 68.00 m -Rp. -Rp.

    Header GSP 100 mm (L = 150 cm) 1.00 unit -Rp. -Rp.

    Pipa PVC AW class 50 mm (over flow) 8.00 m -Rp. -Rp.

    3b Valve :

    Gate valve 65 mm 2.00 bh -Rp -Rp.

    Gate valve 50 mm 3.00 bh -Rp -Rp.

    Gate valve 40 mm 1.00 bh -Rp -Rp.

    Foot valve 75 mm 1.00 bh -Rp -Rp.

    4 Water filter (automatic sand filter) 1.00 unit -Rp. -Rp.

    Kapasitas : 180 ltr / menit

    Sand carbon, zeolit

    4a Sistem pemipaan (PP-R PN10) :

    Pipa PP-R 65 mm (dari Deep well) 10.00 m -Rp. -Rp.

    Pipa PP-R 32 mm 6.00 m -Rp -Rp.

    Pipa PP-R 25 mm (drain) 6.00 m -Rp -Rp.

    Header GSP 100 mm (L = 175 cm) 2.00 unit -Rp. -Rp.

    4b Valve :

    Gate valve 65 mm 2.00 bh -Rp. -Rp. Gate valve 50 mm 1.00 bh -Rp -Rp.

    Gate valve 40 mm 6.00 bh -Rp -Rp.

    Gate valve 25 mm 3.00 bh -Rp -Rp.

    Pressure gauge 15 mm 2.00 bh -Rp -Rp.

    5 Fitting, accessories dan material support 1.00 ls -Rp. -Rp.

    6 Testing dan commissioning 1.00 ls -Rp. -Rp.

    VOLUME

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    17/58

    B Pemipaan :

    B.1 Lantai - 1

    1 Sistem pemipaan (PP-R, PN10) :

    Polypropiline - random pipe (PP-R), 40 mm 4.00 m -Rp -Rp.

    Polypropiline - random pipe (PP-R), 32 mm 41.00 m -Rp. -Rp.

    Polypropiline - random pipe (PP-R), 25 mm 15.00 m -Rp. -Rp.

    Polypropiline - random pipe (PP-R), 20 mm 26.00 m -Rp -Rp.

    Polypropiline - random pipe (PP-R), 15 mm 25.00 m -Rp -Rp.

    2 Valve :

    Gate valve 40 mm 1.00 bh -Rp -Rp. Gate valve 32 mm 2.00 bh -Rp -Rp.

    Gate valve 20 mm 1.00 bh -Rp -Rp.

    Gate valve 15 mm 1.00 bh -Rp -Rp.

    3 Fitting, accessories & material support 1.00 ls -Rp. -Rp.

    4 Testing & commissioning 1.00 ls -Rp. -Rp.

    B.2 Lantai - 2

    1 Sistem pemipaan (PP-R, PN10) :

    Polypropiline - random pipe (PP-R), 40 mm m -Rp -Rp.

    Polypropiline - random pipe (PP-R), 32 mm m -Rp -Rp.

    Polypropiline - random pipe (PP-R), 25 mm m -Rp. -Rp.

    Polypropiline - random pipe (PP-R), 20 mm m -Rp. -Rp.

    Polypropiline - random pipe (PP-R), 15 mm m -Rp. -Rp.

    2 Valve :

    Gate valve 40 mm bh -Rp -Rp. Gate valve 32 mm bh -Rp -Rp.

    Gate valve 25 mm bh -Rp -Rp.

    Gate valve 15 mm bh -Rp -Rp.

    3 Fitting, accessories & material support ls -Rp. -Rp.

    4 Testing & commissioning ls -Rp. -Rp.

    B.3 Lantai - 3

    1 Sistem pemipaan (PP-R, PN10) :

    Polypropiline - random pipe (PP-R), 40 mm m -Rp -Rp.

    Polypropiline - random pipe (PP-R), 32 mm m -Rp -Rp.

    Polypropiline - random pipe (PP-R), 25 mm m -Rp -Rp.

    Polypropiline - random pipe (PP-R), 20 mm m -Rp -Rp.

    Polypropiline - random pipe (PP-R), 15 mm m -Rp -Rp.

    2 Valve :

    Gate valve 40 mm bh -Rp -Rp.

    Gate valve 32 mm bh -Rp -Rp.

    Gate valve 25 mm bh -Rp -Rp.

    3 Fitting, accessories & material support ls -Rp. -Rp.

    4 Testing & commissioning ls -Rp. -Rp.

    Sub total section A.2. -Rp.

    Section A.3. Pekerjaan AC & Exhaust Fan

    A Pekerjaan AC

    a Lantai - 1

    1 Outdoor unit (OU) kapasitas : 180.000 BTU/h unit -Rp. -Rp.

    2 Indoor unit (IU) : unit -Rp -Rp.

    kapasitas : 22.000 BTU/h

    type wall3 Indoor unit (IU) : unit -Rp -Rp.

    kapasitas : 32.000 BTU/h

    4- way ceiling cassette

    4 Indoor unit (IU) : unit -Rp. -Rp.

    kapasitas : 18.000 BTU/h

    4- way ceiling cassette

    5 Setting AC outdoor unit (instalasi & material support) unit -Rp. -Rp.

    6 Setting AC indoor unit (instalasi & material support)

    type wall unit -Rp -Rp.

    type cassette unit -Rp -Rp.

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    18/58

    7 Pipa refigerant lengkap dgn isolasi, fitting, hanger

    accessories dan support material :

    dia. 6.35 mm m -Rp -Rp.

    dia. 12.70 mm m -Rp -Rp.

    dia. 19.10 mm m -Rp. -Rp.

    dia. 22.20 mm m -Rp. -Rp.

    dia. 28.58 mm m -Rp -Rp.

    8 Pipa drain PVC AW class lengkap dgn isolasi, fitting,

    hanger, accessories dan support material :

    dia. 20 mm m -Rp -Rp.Accessorises :

    OU pipe connection unit -Rp -Rp.

    Header 10 cabang unit -Rp -Rp.

    Kabel power dari panel PP-OU. AC ke :

    Outdoor unit (OU) NYY 4 x 6 mm m -Rp. -Rp.

    Kabel kontrol dari indoor ke outdoor shielded 2 x 1.5 mm m -Rp -Rp.

    Material support, testing & commissioning ls -Rp. -Rp.

    b Lantai - 2

    1 Outdoor unit (OU) kapasitas : 240.000 BTU/h unit -Rp. -Rp.

    2 Indoor unit (IU) : unit -Rp -Rp.

    kapasitas : 16.000 BTU/h

    type wall

    3 Indoor unit (IU) : unit -Rp -Rp.

    kapasitas : 32.000 BTU/h 4- way ceiling cassette

    4 Setting AC outdoor unit (instalasi & material support) unit -Rp. -Rp.

    5 Setting AC indoor unit (instalasi & material support)

    type wall unit -Rp -Rp.

    type cassette unit -Rp -Rp.

    6 Pipa refigerant lengkap dgn isolasi, fitting, hanger

    accessories dan support material :

    dia. 6.35 mm m -Rp -Rp.

    dia. 12.70 mm m -Rp -Rp.

    dia. 19.10 mm m -Rp. -Rp.

    dia. 22.20 mm m -Rp. -Rp.

    dia. 28.58 mm m -Rp -Rp.

    7 Pipa drain PVC AW class lengkap dgn isolasi, fitting,

    hanger, accessories dan support material :

    dia. 20 mm m -Rp -Rp.

    Accessorises :

    OU pipe connection unit -Rp -Rp.

    Header 10 cabang unit -Rp -Rp.

    Kabel power dari panel PP-OU. AC ke :

    Outdoor unit (OU) NYY 4 x 10 mm m -Rp. -Rp.

    Kabel kontrol dari indoor ke outdoor shielded 2 x 1.5 mm m -Rp -Rp.

    Material support, testing & commissioning ls -Rp. -Rp.

    c Lantai - 3

    1 Outdoor unit (OU) kapasitas : 144.000 BTU/h unit -Rp. -Rp.

    2 Indoor unit (IU) : unit -Rp -Rp.

    kapasitas : 6.000 BTU/h

    type wall

    3 Indoor unit (IU) : unit -Rp -Rp.

    kapasitas : 18.000 BTU/h

    4- way ceiling cassette

    4 Setting AC outdoor unit (instalasi & material support) unit -Rp. -Rp.

    5 Setting AC indoor unit (instalasi & material support)

    type wall unit -Rp -Rp.

    type cassette unit -Rp -Rp.

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    19/58

    6 Pipa refigerant lengkap dgn isolasi, fitting, hanger

    accessories dan support material :

    dia. 6.35 mm m -Rp -Rp.

    dia. 12.70 mm m -Rp -Rp.

    dia. 19.10 mm m -Rp. -Rp.

    dia. 22.20 mm m -Rp. -Rp.

    dia. 28.58 mm m -Rp -Rp.

    7 Pipa drain PVC AW class lengkap dgn isolasi, fitting,

    hanger, accessories dan support material :

    dia. 20 mm m -Rp -Rp.Accessorises :

    OU pipe connection unit -Rp -Rp.

    Header 10 cabang unit -Rp -Rp.

    Kabel power dari panel PP-OU. AC ke :

    Outdoor unit (OU) NYY 4 x 6 mm m -Rp. -Rp.

    Kabel kontrol dari indoor ke outdoor shielded 2 x 1.5 mm m -Rp -Rp.

    Material support, testing & commissioning ls -Rp. -Rp.

    B. Pekerjaan Exhaust Fan

    a. Lantai - 1

    1 Exhaust Fan (EF)

    EF. 1.1 s/d 1.4, kap : 90 cfm 4.00 unit -Rp -Rp.

    2 Exhaust Air Grille (EAG)

    200 x 200 4.00 unit -Rp -Rp.

    3 Ducting termasuk isolasi 150 x 150 12.00 m -Rp -Rp.

    4 Instalasi, material support, testing & commissioning 1.00 ls -Rp -Rp.

    b. Lantai - 2

    1 Exhaust Fan (EF)

    EF. 2.1 s/d 2.3, kap : 90 cfm unit -Rp -Rp.

    2 Exhaust Air Grille (EAG)

    200 x 200 unit -Rp -Rp.

    3 Ducting termasuk isolasi & material bantu

    150 x 150 m -Rp -Rp.

    4 Instalasi, material support, testing & commissioning ls -Rp -Rp.

    c. Lantai - 3

    1 Exhaust Fan (EF)

    EF. 3.1 s/d 3.4, kap : 90 cfm unit -Rp -Rp.

    2 Exhaust Air Grille (EAG)

    200 x 200 unit -Rp -Rp.

    3 Ducting termasuk isolasi & material bantu

    150 x 150 m -Rp -Rp.

    4 Instalasi, material support, testing & commissioning ls -Rp -Rp.

    Sub total section A.3. -Rp.

    Section A.4. Pekerjaan Sumur zet pump

    1 Pekerjaan pengeboran : 1.00 lot -Rp. -Rp.

    ~ Transportasi & akomodasi

    ~ Mobilisasi & demobilisasi alat pemboran / rig

    ~ Pemasangan/pembongkaran drilling rig & alat bantu~ Pit lumpur, landasan rig, laporan & dokumentasi

    ~ Piva dan asesoris 1.00 lot -Rp. -Rp.

    2 Pompa & perlengkapan :

    Pompa sumbersible 1.00 unit -Rp. -Rp.

    Accessories pompa (kabel kontrol & kabel power, 1.00 ls -Rp. -Rp.

    valve & material support

    Sub total section A.4. -Rp.

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    20/58

    J U M L A H

    SUB REKAPITULASI PEKERJAAN ELEKTRIKAL

    DIVISI B.0. PEKERJAAN ELEKTRIKAL

    Section B.1. Pekerjaan Distribusi Listrik Utama -Rp.

    Section B.2. Pekerjaan Elektrikal Lantai - 1 -Rp.

    Section B.3. Pekerjaan Elektrikal Lantai - 2 -Rp.

    Section B.4. Pekerjaan Elektrikal Lantai - 3 -Rp.

    Section B.5. Penangkal Petir -Rp.

    TOTAL PEKERJAAN ELEKTRIKAL -Rp.

    U R A I A N P E K E R J A A N

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    21/58

    No. URAIAN PEKERJAAN HARGA SATUAN JUMLAH

    DIVISI B.0. PEKERJAAN ELEKTRIKAL

    Section B.1. Pekerjaan Distribusi Listrik Utama

    1 Biaya penyambungan (BP-PLN) termasuk biaya SLO 66.00 kVA -Rp. -Rp.

    (Sertifikat Laik Operasi) untuk sambungan kapasitas 66 kVA

    2a Panel SDP-BC 1.00 unit -Rp. -Rp.

    ~ Panel box (1 unit)

    ~ MCCB 3P, 160A, 16kA (1 bh)

    ~ MCCB 3P, 125A, 16kA (1 bh)

    ~ MCB 3P, 40A, 10kA (1 bh)

    ~ MCB 3P, 32A, 10kA (1 bh)

    ~ MCB 3P, 25A, 10kA (1 bh)

    ~ MCB 3P, 16A, 10kA (1 bh)

    ~ Ampere meter 0-250 A (3 bh)

    ~ Current transformer 200/5 A (3 bh)

    ~ Volt meter 0-500 V (1 bh)

    ~ Volt-selector switch (1 bh)

    ~ kW meter (1 bh)

    ~ Terminal block (1 lot)

    ~ Fuse control, 2A (12 bh)

    ~ Pilot lamp 220 VAC c/w : LED (3 bh)

    ~ Busbar & accessories (1 lot)

    2b Instalasi (wiring & diagram) 1.00 ls -Rp. -Rp.

    3c Peralatan & material bantu 1.00 ls -Rp. -Rp.

    4 Kabel Utama dari Meter PLN ke :

    SDP-BC, NYY 4 x 50 mm 45.00 m -Rp. -Rp.

    5 Kabel distribusi dari SDP-BC ke :

    Panel Kontrol Pompa, NYY 4 x 2,5 mm 95.00 m -Rp. -Rp.

    LP-A, NYY 4 x 6 mm 6.00 m -Rp. -Rp.

    LP-B, NYY 4 x 6 mm 12.00 m -Rp. -Rp.

    LP-C, NYY 4 x 4 mm 34.00 m -Rp. -Rp.

    PP-OU.AC, NYY 4 x 35 mm 25.00 m -Rp. -Rp.

    Sub total section B.1. -Rp.

    Section B.2. Pekerjaan Elektrikal Lantai - 1

    A Sub Distribusi

    1a Panel LP-A 1.00 unit -Rp. -Rp.

    ~ Panel box (1 unit)

    ~ MCB 3P, 25A, 10kA (1 bh)

    ~ MCB 1P, 10A, 6kA (16 bh)

    ~ MCB 1P, 6A, 6kA (5 bh)

    ~ Fuse control, 2A (3 bh)

    ~ Pilot lamp 220 VAC c/w : LED (3 bh)

    ~ Busbar & accessories (1 lot)

    1b Instalasi (wiring & diagram) 1.00 ls -Rp. -Rp.

    1c Peralatan & material bantu 1.00 ls -Rp. -Rp.

    B Instalasi & Fixtures

    1 Lampu Downlight 3" Tornado 8W 24.00 set -Rp. -Rp.

    2 Lampu Downlight 4" PL 14W 33.00 set -Rp. -Rp.

    3 Lampu Ceiling Recessed 2 x 18W 13.00 set -Rp. -Rp.

    4 Lampu Ceiling Recessed 2 x 36W 17.00 set -Rp. -Rp.

    5 Lampu dinding di atas cermin TL 18W, cover acrylic 2.00 set -Rp. -Rp.

    6 Lampu TLD V-Shafe 1 x 18W 11.00 set -Rp. -Rp.

    7 Lampu TLD V-Shafe 1 x 36W 3.00 set -Rp. -Rp.

    8 Floodlight, Halogen 150W 2.00 set -Rp. -Rp.

    VOLUME

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    22/58

    9 Lampu Dinding PL 11W 6.00 set -Rp. -Rp.

    10 Lampu Taman Bolard Kotak PL18W c/w include base 8.00 set -Rp. -Rp.

    11 LDR, 6A 1.00 bh -Rp. -Rp.

    12 Saklar tunggal, rating 10A 9.00 bh -Rp. -Rp.

    13 Saklar ganda, rating 10A 22.00 bh -Rp. -Rp.

    14 Saklar hotel, rating 10A 4.00 bh -Rp. -Rp.

    15 Outlet kotak kontak dinding, rating 10A 30.00 bh -Rp. -Rp.

    16 Outlet kotak kontak lantai, rating 10A 29.00 bh -Rp. -Rp.

    17 Instalasi titik lampu & outlet, rating 10A 178.00 ttk -Rp. -Rp.

    18 Instalasi power Indoor AC & Fan, rating 10A 12.00 ttk -Rp. -Rp.

    C Rak kabel

    1 Rak kabel (300 x 50) mm 40.00 m -Rp. -Rp.

    2 Instalasi, accessories & material support 1.00 ls -Rp. -Rp.

    D. Testing & Commissioning 1.00 ls -Rp. -Rp.

    Sub total section B.2. -Rp.

    Section B.3. Pekerjaan Elektrikal Lantai - 2

    A Sub Distribusi

    1a Panel LP-B unit -Rp. -Rp.

    ~ Panel box (1 unit)

    ~ MCB 3P, 32A, 10kA (1 bh)

    ~ MCB 1P, 10A, 6kA (16 bh)

    ~ MCB 1P, 6A, 6kA (5 bh)

    ~ Fuse control, 2A (3 bh)

    ~ Pilot lamp 220 VAC c/w : LED (3 bh)

    ~ Busbar & accessories (1 lot)

    1b Instalasi (wiring & diagram) ls -Rp. -Rp.

    1c Peralatan & material bantu ls -Rp. -Rp.

    B Instalasi & Fixtures

    1 Lampu Downlight 3" Tornado 8W set -Rp. -Rp.

    2 Lampu Downlight 4" PL 14W set -Rp. -Rp.

    3 Lampu Ceiling Recessed 2 x 36W set -Rp. -Rp.

    4 Lampu dinding di atas cermin TL 18W, cover acrylic set -Rp. -Rp.

    5 Lampu TLD V-Shafe 1 x 18W set -Rp. -Rp.

    6 Saklar tunggal, rating 10A bh -Rp. -Rp.

    7 Saklar ganda, rating 10A bh -Rp. -Rp.

    8 Saklar hotel, rating 10A bh -Rp. -Rp.

    9 Outlet kotak kontak dinding, rating 10A bh -Rp. -Rp.

    10 Outlet kotak kontak lantai, rating 10A bh -Rp. -Rp.

    11 Instalasi titik lampu & titik daya, rating 10A ttk -Rp. -Rp.

    12 Instalasi power Indoor AC & Fan, rating 10A ttk -Rp. -Rp.

    C Rak kabel

    1 Rak kabel (300 x 50) mm m -Rp. -Rp.

    2 Instalasi, accessories & material support ls -Rp. -Rp.

    D. Testing & Commissioning ls -Rp. -Rp.

    Sub total section B.3. -Rp.

    Section B.4. Pekerjaan Elektrikal Lantai - 3

    A Sub Distribusi :

    1a Panel LP-C unit -Rp. -Rp.

    ~ Panel box (1 unit)

    ~ MCB 3P, 20A, 10kA (1 bh)

    ~ MCB 1P, 10A, 6kA (8 bh)

    ~ MCB 1P, 6A, 6kA (4 bh)

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    23/58

    ~ Fuse control, 2A (3 bh)

    ~ Pilot lamp 220 VAC c/w : LED (3 bh)

    ~ Busbar & accessories (1 lot)

    1b Instalasi (wiring & diagram) ls -Rp. -Rp.

    1c Peralatan & material bantu ls -Rp. -Rp.

    B Instalasi & Fixtures

    1 Lampu Downlight 3" Tornado 8W set -Rp. -Rp.

    2 Lampu Downlight 4" PL 14W set -Rp. -Rp.

    3 Lampu Ceiling Recessed 2 x 36W set -Rp. -Rp.4 Lampu dinding di atas cermin TL 18W, cover acrylic set -Rp. -Rp.

    5 Lampu TLD V-Shafe 1 x 36W set -Rp. -Rp.

    6 Saklar tunggal, rating 10A bh -Rp. -Rp.

    7 Saklar ganda, rating 10A bh -Rp. -Rp.

    8 Outlet kotak kontak dinding, rating 10A bh -Rp. -Rp.

    9 Outlet kotak kontak lantai, rating 10A bh -Rp. -Rp.

    10 Instalasi titik lampu & outlet, rating 10A ttk -Rp. -Rp.

    11 Instalasi power Indoor AC & Fan, rating 10A ttk -Rp. -Rp.

    C Rak kabel

    1 Rak kabel (300 x 50) mm m -Rp. -Rp.

    2 Instalasi, accessories & material support ls -Rp. -Rp.

    D Testing & Commissioning ls -Rp. -Rp.

    Sub total section B.4. -Rp.

    Section B.5. Penangkal Petir

    1 Penangkal petir type Elektrostatik, R = 50 m 1.00 set -Rp. -Rp.

    ~ Air terminal / spit

    ~ Connecting sleeve

    ~ Counter stroke

    2 Pipa GIP medium class 50 mm (H = 4 m) 1.00 unit -Rp. -Rp.

    3 Down conductor XLPE 70 mm 34.00 m -Rp. -Rp.

    4 Test box 1.00 bh -Rp. -Rp.

    5 Control box (50 x 50 x 50) cm 1.00 bh -Rp. -Rp.

    6 Arde grounding spit 1" (max. resistance 2 ohm) 1.00 unit -Rp. -Rp.

    7 Clamp, bolt & material support 1.00 ls -Rp. -Rp.

    8 Perijinan, testing & commissioning 1.00 ls -Rp. -Rp.

    Sub total section B.5. -Rp.

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    24/58

    No. SATUAN HARGA SATUAN

    1 Polypropiline Pipe PP-R, PN10 (Instalasi air bersih) 1.20 (pipa PP-R : 1 btng =

    Polypropiline - random pipe (PP-R), 150 mm m 6" 3,300,000.00Rp

    Polypropiline - random pipe (PP-R), 100 mm m 4" 1,350,000.00Rp

    Polypropiline - random pipe (PP-R), 75 mm m 3" 890,000.00Rp

    Polypropiline - random pipe (PP-R), 65 mm m 2" 640,000.00Rp

    Polypropiline - random pipe (PP-R), 50 mm m 2" 400,000.00Rp

    Polypropiline - random pipe (PP-R), 40 mm m 1" 315,250.00Rp

    Polypropiline - random pipe (PP-R), 32 mm m 1" 250,000.00Rp

    Polypropiline - random pipe (PP-R), 25 mm m 1" 108,000.00Rp

    Polypropiline - random pipe (PP-R), 20 mm m "72,000.00Rp

    Polypropiline - random pipe (PP-R), 15 mm m " 50,000.00Rp

    2 Polypropiline Pipe PP-R, PN20 (Instalasi air panas)

    Polypropiline - random pipe (PP-R), 65 mm m 2" 1,000,000.00Rp

    Polypropiline - random pipe (PP-R), 50 mm m 2" 680,000.00Rp

    Polypropiline - random pipe (PP-R), 40 mm m 1" 575,000.00Rp

    Polypropiline - random pipe (PP-R), 32 mm m 1" 400,000.00Rp

    Polypropiline - random pipe (PP-R), 25 mm m 1" 175,000.00Rp

    Polypropiline - random pipe (PP-R), 20 mm m " 109,000.00Rp

    Polypropiline - random pipe (PP-R), 15 mm m " 69,000.00Rp

    3 Pipa PVC (Tekanan nominal 5 BAR, instalasi air kotor & buangan) 1.20 (pipa PVC : 1 btng =

    Pipa PVC 400 mm m 1,658,000.00Rp

    Pipa PVC 300 mm m 1,325,000.00Rp

    Pipa PVC 250 mm m 950,470.00Rp

    Pipa PVC 200 mm m 641,780.00Rp Pipa PVC 150 mm m 384,650.00Rp

    Pipa PVC 100 mm m 169,880.00Rp

    Pipa PVC 75 mm m 113,130.00Rp

    Pipa PVC 65 mm m 80,810.00Rp

    Pipa PVC 50 mm m 51,000.00Rp

    Pipa PVC 40 mm m 40,420.00Rp

    JENIS MATERIAL

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    25/58

    4 Galian tanah biasa kedalaman 1-2 m /m (SNI DT 91-0006-2007, 6.2)

    Pekerja 0.9000 oh -Rp. -Rp.

    Mandor 0.0450 oh -Rp. -Rp.

    Sub Jumlah -Rp.

    Biaya umum, keuntungan & over head (10%) -Rp.

    Jumlah -Rp.

    5 Urug tanah kembali & perataan /m (Revisi SNI 03-2835-2002, 6.9)

    Pekerja 0.3000 oh -Rp -Rp.

    Mandor 0.0150 oh -Rp -Rp.

    Sub Jumlah -Rp.

    Biaya umum, keuntungan & over head (10%) -Rp.

    Jumlah -Rp.

    6 Urugan pasir /m (SNI DT 91-0006-2007, 6.11)

    Pasir urug 1.2000 m -Rp -Rp.

    Pekerja 0.3000 oh -Rp -Rp.

    Mandor 0.0100 oh -Rp -Rp.

    Sub Jumlah -Rp.

    Biaya umum, keuntungan & over head (10%) -Rp.

    Jumlah -Rp.

    7 Lantai kerja 1pc : 3psr : 5krl /m (Revisi SNI T-13-2002, 6.4)Pekerjaan Beton Septictank / m

    Portlant cement 230.0000 kg -Rp. -Rp.

    Pasir beton 0.7654 m -Rp. -Rp.

    Koral beton (maksimum 30 mm) 0.7607 m -Rp. -Rp.

    Air 200.0000 ltr -Rp. -Rp.

    Pekerja 1.2000 oh -Rp. -Rp.

    Tukang batu 0.2000 oh -Rp. -Rp. Kepala tukang batu 0.0200 oh -Rp. -Rp.

    Mandor 0.0600 oh -Rp. -Rp.

    Sub Jumlah -Rp.

    Biaya umum, keuntungan & over head (10%) -Rp.

    Jumlah -Rp.

    Pekerjaan Beton Septictank / m

    Beton ready mix K - 300 1.0000 m -Rp. -Rp.

    Besi Beton 103.9100 kg -Rp -Rp.

    Bekisting 5.0000 m -Rp -Rp.

    Upah cor termasuk vibrator & incuring 1.0000 m -Rp -Rp.

    Sub Jumlah -Rp.

    Biaya umum, keuntungan & over head (10%) -Rp.

    Jumlah -Rp.

    9 Pipa PVC 150 mm / m (buangan air bekas)

    Galian tanah 0.6000 m -Rp. -Rp. Urug tanah kembali & perataan 0.6000 m -Rp. -Rp.

    Pasir urug (leveling pipa) 0.0800 m -Rp. -Rp.

    Pipa PVC 150 mm 1.0500 m -Rp. -Rp.

    Jumlah -Rp.

    8 Pipa PVC 100 mm / m (buangan air bekas)

    Galian tanah 0.6000 m -Rp. -Rp.

    Urug tanah kembali & perataan 0.6000 m -Rp. -Rp.

    Pasir urug (leveling pipa) 0.0800 m -Rp. -Rp.

    Pipa PVC 100 mm 1.0500 m -Rp. -Rp.

    Jumlah -Rp.

    9 Pipa PVC 50 mm / m (buangan air bekas)

    Galian tanah 0.6000 m -Rp. -Rp.

    Urug tanah kembali & perataan 0.6000 m -Rp. -Rp.

    Pasir urug (leveling pipa) 0.0800 m -Rp. -Rp.

    Pipa PVC 50 mm 1.0500 m -Rp. -Rp.

    Jumlah -Rp.

    10 Bak kontrol 50 x 50 (kedalaman rata-rata : 76 cm) /unit (air bekas)

    Galian tanah 1.0125 m -Rp. -Rp.

    Urug tanah kembali & perataan 1.0125 m -Rp. -Rp.

    Pasir urug 0.0810 m -Rp. -Rp.

    Lantai kerja 0.0320 m -Rp. -Rp.

    Beton site mix K-225 0.2890 m -Rp. -Rp.

    Besi beton 19.9870 kg -Rp. -Rp.

    Bekisting praktis 5.0800 m -Rp. -Rp.

    Handle 16 mm 1.0000 bh -Rp. -Rp.

    Plester kemiringan 0.2500 m -Rp. -Rp.

    Jumlah -Rp.

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    26/58

    Harga Satuan Jumlah Harga

    (Rp.) (Rp.)1 3 4 5 6

    F PEKERJAAN SITE DEVELOPMENT

    I PEKERJAAN BANGUNAN PENUNJANG

    1.1 Pek. Ground Tank 120 m3

    - Pek. Urugan tanah peninggian bangunan (h=40 cm) m3

    - Pek. Pemadatan tanah urugan peninggian bangunan m2

    - Pek. Pondasi Konstruksi Sarang Laba Laba m2

    - Pek. Stek Kolom (L = 100 cm)

    Besi D16 (1.683 Kg/m) kg

    Sengkang 10 - 100 (0.617 Kg/m) kg

    - Pek. Kolom KG (25/25) 8 unit (h = 2,50 m)

    Beton K300 m3

    Besi 8 D 16 (1.683 Kg/m) kg

    Sengkang 10 - 150 (0.617 Kg/m) kg

    Bekisting Kolom multiplek 9mm m2

    - Beam B3 (200 x 400 mm)

    Beton K300 m3

    Besi 4 D16 (1.683 Kg/m) kg

    Sengkang 10 - 150 (0.617 Kg/m) kg

    Bekisting balok multipleks 9mm (bawah + 2sisi) m2

    - Beam B5 (200 x 300 mm)

    Beton K300 m3

    Besi 4 D13 (1.042 Kg/m) kg

    Sengkang 10 - 150 (0.617 Kg/m) kgBekisting balok multipleks 9mm (bawah + 2sisi) m

    2

    - Dinding Beton ( t = 150 mm)

    Beton K300 m3

    wiremesh M8 (59,535 kg/lembar) 2 lapis kg

    Bekisting dinding m2

    - Plat Dak beton ( t = 120 mm)

    Beton K300 m3

    wiremesh M7 (45,59 kg/lembar) 2 lapis kg

    Bekisting Plat m2

    - Pek. Waterproofing membran m2

    - Pek. Lantai kerja pelindung waterproofing (plat dak beton) m3

    (t = 5 cm)

    - Pek. Pasangan keramik dinding dan lantai 30x30 Putih m2

    - Pek. Pintu man hole (rangka besi siku + plat) unit

    1.2 Pek. R. Pompa, R. Panel & R. Trafo

    - Pek. Urugan tanah peninggian bangunan (h=40 cm) m3

    - Pek. Pemadatan tanah urugan peninggian bangunan m2

    - Pek. Pondasi Konstruksi Sarang Laba Laba m2

    - Pek. Stek Kolom (L = 100 cm)

    Besi D16 (1.683 Kg/m) kg

    Sengkang 10 - 100 (0.617 Kg/m) kg

    - Pek. Kolom KG2 (25/25) 8 unit (h = 2,50 m)

    Beton K300 m

    3

    2

    0

    PEKERJAAN PEMBANGUNAN GEDUNG KANTOR BALAI PSDA Ws. CITARUM

    JL. SMK 6 - SOEKARNO HATTA - KOTA BANDUNG

    TAHUN 2016

    No. Uraian Pekerjaan Satuan Volume

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    27/58

    Harga Satuan Jumlah Harga

    (Rp.) (Rp.)1 3 4 5 62

    No. Uraian Pekerjaan Satuan Volume

    Besi 4 D 16 (1.683 Kg/m) kg

    Sengkang 10 - 150 (0.617 Kg/m) kg

    Bekisting Kolom multiplek 9mm m2

    - Beam B3 (200 x 400 mm)

    Beton K300 m3

    Besi 4 D16 (1.683 Kg/m) kg

    Sengkang 10 - 150 (0.617 Kg/m) kg

    Bekisting balok multipleks 9mm (bawah + 2sisi) m2

    - Beam B5 (200 x 300 mm)

    Beton K300 m3

    Besi 4 D13 (1.042 Kg/m) kg

    Sengkang 10 - 150 (0.617 Kg/m) kg

    Bekisting balok multipleks 9mm (bawah + 2sisi) m2

    - Plat Dak beton ( t = 120 mm)

    Beton K300 m3

    wiremesh M7 (45,59 kg/lembar) 2 lapis kg

    Bekisting Plat m2

    - Pek. Waterproofing membran m

    2

    - Pek. Lantai kerja pelindung waterproofing (plat dak beton) m3

    (t = 5 cm)

    - Pek. Dinding 1/2 Bata (1 PC: 5 PS) m2

    - Pek. Plesteran dinding (1 PC : 5 PS) m2

    - Pek. Acian dinding m2

    - Pek. Acian Kolom struktur m2

    - Pek. Acian Pelat dan Balok Beton m2

    - Pek. Kolom praktis 11/11 m'

    - Balok Lintel 12/15 m'

    - Pek. Finishing lantai epoxy coating m2

    - Pek. Pintu besi single PB 3 unit

    - Pek. Pintu besi double PB 2 unit

    - Pek. Jalusi besi unit

    - Pek. Pengecatan Dinding Interior m2

    - Pek. Pengecatan Dinding Exterior m2

    - Pek. Pengecatan Plafond m2

    - Pek. Pegecatan Cat Kolom m2

    - Pek. Pengecatan Pintu Besi m2

    Sub Jumlah I

    II PEKERJAAN JALAN DAN TAMAN

    1.1 Pek. Jalan

    - Lapisan pondasi agregat kelas A (LPA) (20 cm) m3

    209.00

    - Paving Block eks Cisangkan m

    2

    1,045.001.2 Pek. Pemasangan Kansteen berikut pengecatan m' 61.00

    1.3 Pek. Urugan tanah gembur (h= 10 cm) m3

    1.4 Pek. Penanaman pohon ketapang (h= 1m) btg

    1.5 Pek. Penanaman pohon tabe buya putih (h= 1m) btg

    1.6 Pek. Penanaman pohon angsana kuning (h= 1m) btg

    1.7 Pek. Penanaman rumput jepang m2

    1.8 Pek. Penanaman pohon palem raja (h= 1m) btg

    1.9 Pek. Penanaman pohon pangkas kuning (h= 1m) bh

    Sub Jumlah II

    Jumlah E

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    28/58

    A ANALISA UMUM

    1 1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK2 1 M2 KANTOR SEMENTARA LANTAI PLESTERAN

    3 1 M2 GUDANG SEMEN DAN PERALATAN

    4 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M

    5 1 M2 PEMBERSIHAN DAN PERATAAN LAPANGAN

    6 1 M3 PEMBONGKARAN DINDING BATA

    7 1 UNIT PAPAN NAMA PROYEK 80 X 120 CM

    8 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 1 M

    9 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 2 M

    10 1 M3 GALIAN TANAH DENGAN ALAT BERAT

    11 1 M3 PEKERJAAN TIMBUNAN TANAH DARI LUAR

    12 1 M3 URUGAN KEMBALI TANAH BEKAS GALIAN

    13 1 M3 BUANGAN TANAH KELUAR LOKASI SEJAUH 30 METER

    14 1 M3 PEMADATAN TANAH (PER 20 CM)

    15 1 M3 MENGURUG PASIR URUG

    16 1 M3 URUGAN SIRTU PADAT

    17 1 M3 PASANG PONDASI BATU BELAH (1PC : 5PS)

    18 1 M3 PASANG BATU KOSONG / AANSTAMPING

    19 1 M2 PASANG DINDING BATA MERAH 1/2 BT (1PC : 3PS)

    20 1 M2 PASANG DINDING BATA MERAH 1/2 BT (1PC : 5PS)

    21 1 M2 PLESTERAN DINDING 1 : 3 T= 15 mm

    22 1 M2 PLESTERAN DINDING 1 : 5 T= 15 mm

    23 1 M2 PEMASANGAN ACIAN DINDING

    24 1 M2 PASANG DINDING BATU ANDESIT

    25 1 M2 DAUN PINTU PANEL KAYU KAMPER BANJAR

    26 1 M2 DAUN PINTU PLYWOOD RANGKAP, RANGKA EKSPOSED KAYU KAMPER BANJAR

    27 1 M2 DAUN PINTU PLYWOOD 4 MM + FORMIKA 4 MM RANGKA EKSPOSED KAYU KAMPER BANJAR

    28 1 M2 DAUN PINTU KACA RANGKA EKSPOSED KAYU KAMPER BANJAR TANPA KACA

    29 1 M2 DAUN PINTU BESI PLAT TEBAL 2 MM RANGKAP (RANGKA BAJA SIKU)

    30 1 M2 JALUSI BESI STRIP (2 x 3 MM)

    31 1 M KUSEN ALUMINIUM

    32 1 M2 DAUN PINTU KACA RANGKA ALUMUNIUM TANPA KACA

    33 1 M2 PASANG KACA TEBAL 5 MM

    34 1 M2 PASANG KACA TEBAL 8 MM

    35 1 M2 PASANG KACA TEMPERRED TEBAL 10 MM

    36 1 M2 PASANG KACA TEMPERRED TEBAL 12 MM

    37 1 M2 PASANG KACA CERMIN TEBAL 5 MM

    38 1 M2 RANGKA PLAFOND BESI HOLLOW 1x40.40.2mm, MODUL 60x60 cm

    39 1 M2 RANGKA PLAFOND BESI HOLLOW 1x40.40.2mm, MODUL 60x60 cm (DROP CEILLING)

    40 1 M2 PASANG PLAFOND GYPSUM 9 mm

    41 1 M2 PASANGAN PLAFOND GYPSUM WET AREA 9 mm

    42 1 M' PASANG LIST PROFIL PLAFOND GYPSUM

    43 1 M2 PEMASANGAN LANTAI GRANIT TILE 60 x 60 CM POLISHED

    44 1 M2 PEMASANGAN LANTAI GRANIT TILE 60 x 60 CM UNPOLISHED45 1 M2 PEMASANGAN LANTAI GRANIT TILE 30 x 60 CM POLISHED

    46 1 M2 PEMASANGAN LANTAI KERAMIK 40 x 40 CM

    47 1 M2 PEMASANGAN LANTAI KERAMIK 30 x 30 CM ANTI SLIP

    48 1 M2 PEMASANGAN LANTAI KERAMIK 20 x 20 CM ANTI SLIP

    49 1 M2 PEMASANGAN LANTAI KERAMIK 30 x 30 CM PUTIH

    50 1 M2 PEMASANGAN LANTAI PEARLSTONE

    51 1 M2 PEMASANGAN GRANIT ALAM

    52 1 M2 PEMASANGAN DINDING KERAMIK 30 x 60 CM

    53 1 M2 PEMASANGAN DINDING KERAMIK 20 x 40 CM

    54 1 M' PEMASANGAN PLINT GRANIT TILE 10 x 60 CM

    55 1 M' PEMASANGAN PLINT KERAMIK 10 x 40 CM

    56 1 M' PEMASANGAN PLINT KERAMIK 10 x 30 CM

    JUMLAH (RP)URAIAN PEKERJAAN

    0

    PEKERJAAN PEMBANGUNAN GEDUNG KANTOR BALAI PSDA Ws. CITARUM

    JL. SMK 6 - SOEKARNO HATTA - KOTA BANDUNG

    TAHUN 2016

    No.

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    29/58

    JUMLAH (RP)URAIAN PEKERJAANNo.

    57 1 M' PEMASANGAN BORDER DINDING KERAMIK KM/WC 8 x 30 CM

    58 1 M2 PEMASANGAN BORDER DINDING KERAMIK KM/WC 8 x 20 CM

    59 1 M' PASANG STEPNOSING KERAMIK TILE 10/30

    60 1 M2 PENGECATAN DINDING DAN PLAFOND INTERIOR

    61 1 M2 PENGECATAN DINDING EKSTERIOR/WEATHER SHIELD

    62 1 M2 PENGECATAN DINDING/LANTAI DENGAN CAT EPOXY

    63 1 M2 PENGECATAN KAYU

    64 1 M2 PENGECATAN BESI SECARA SEMPROT SISTEM 3 LAPIS CAT

    65 1 M2 PEKERJAAN WATERPROOFING MEMBRAN66 1 M2 PASANG DOUBLE ALUMUNIUM FOIL

    67 1 M2 PARTISI DOUBLE GYPSUM RANGKA METAL STUD

    68 1 M' PASANG PLINT KAYU KAMPER 2x10

    69 1 UNIT BAK KONTROL 100 X 100 X 50

    70 1 M' PASANG SALURAN GRAVEL U - 25 CM

    71 1 M' PASANG SALURAN GRAVEL U - 30 CM

    72 1 M2 GLASSBOX uk. 200 x 200 mm

    73 1 M2 PEKERJAAN LAPISAN PONDASI AGREGAT KELAS B (LPB)

    74 1 M2 PEKERJAAN LAPISAN PONDASI AGREGAT KELAS A (LPA)

    75 1 M2 PEKERJAAN LAPISAN AC/WC HOTMIX (t = 3 cm)

    76 1 BH MEMASANG CLOSET DUDUK/MONOBLOCK

    77 1 BH MEMASANG CLOSET JONGKOK

    78 1 BH MEMASANG URINOIR

    79 1 BH MEMASANG SEKAT URINOIR

    80 1 BH MEMASANG WASTAFEL

    81 1 BH MEMASANG KITCHENZINC

    82 1 BH MEMASANG FLOORDRAIN

    83 1 BH MEMASANG KRAN AIR

    84 1 BH MEMASANG JET WASHER

    85 1 UNIT CUBICLE PARTISI TOILET LENGKAP ASESORIES

    86 1 M' RAILING TANGGA STAINLESS

    87 1 M' HAND RAILING TANGGA STAINLESS

    88 1 M' RAILING PIPA BSP

    B ANALISA STRUKTUR

    1 1 M3 BETON COR 1 : 3 : 5 (LANTAI KERJA)

    2 1 M3 COR BETON SITE MIX K-175

    3 1 M3 COR BETON SITE MIX K-300

    4 1 M3 COR BETON READY MIX K-300 DAN POMPA BETON5 1 M3 BEKISTING PAPAN (2 X PAKAI)

    6 1 M2 BEKISTING KOLOM MULTIPLEKS 9 mm (2 X PAKAI)

    7 1 M2 BEKISTING BALOK MULTIPLEKS 9 mm (2 X PAKAI)

    8 1 M2 BEKISTING PLAT LANTAI MULTIPLEKS 9 mm (2 X PAKAI)

    9 1 M2 BEKISTING TANGGA MULTIPLEKS 9 mm (2 X PAKAI)

    10 1 M2 BEKISTING DINDING MULTIPLEKS 9 mm (2 X PAKAI)

    11 1 KG MENGERJAKAN BESI BETON ULIR U-39

    12 1 KG MENGERJAKAN BESI BETON ULIR U-24

    13 1 KG BESI PROFIL/SIKU/PIPA/PLAT

    14 1 KG MENGERJAKAN BESI WIRE MESH

    15 1 M KOLOM PRAKTIS 11/11 CM, K-175

    16 1 M BALOK PRAKTIS DAN SLOOF PRAKTIS 12/15 CM, K-175

    17 1 M3 TOPI BETON DAN MEJA BETON T=10 CM, K-175

    C ANALISA KUSEN

    1 1 UNIT PEKERJAAN KUSEN DAN DAUN PINTU KACA ALLUMUNIUM TYPE P1

    2 1 UNIT PEKERJAAN KUSEN DAN DAUN PINTU KACA ALLUMUNIUM TYPE P2

    3 1 UNIT PEKERJAAN KUSEN ALLUMUNIUM DAN DAUN PINTU TYPE P3

    4 1 UNIT PEKERJAAN KUSEN DAN DAUN PINTU KACA ALLUMUNIUM TYPE P4

    5 1 UNIT PEKERJAAN KUSEN ALLUMUNIUM DAN DAUN PINTU KAYU TYPE P5

    6 1 UNIT PEKERJAAN KUSEN ALLUMUNIUM DAN DAUN PINTU KAYU TYPE P6

    7 1 UNIT PEKERJAAN KUSEN ALLUMUNIUM DAN DAUN PINTU KAYU TYPE P7

    8 1 UNIT PEKERJAAN KUSEN ALUMUNIUM DAN DAUN PINTU JENDELA KAYU TYPE P8

    9 1 UNIT PEKERJAAN KUSEN ALLUMUNIUM DAN DAUN PINTU KAYU SHAFT

    10 1 UNIT PEKERJAAN KUSEN JENDELA TYPE J1

    11 1 UNIT PEKERJAAN KUSEN JENDELA TYPE J1B

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    30/58

    JUMLAH (RP)URAIAN PEKERJAANNo.

    12 1 UNIT PEKERJAAN KUSEN JENDELA TYPE J2

    13 1 UNIT PEKERJAAN KUSEN JENDELA TYPE J3

    14 1 UNIT PEKERJAAN KUSEN JENDELA TYPE J4

    15 1 UNIT PEKERJAAN KUSEN JENDELA TYPE J5

    16 1 UNIT PEKERJAAN KUSEN JENDELA TYPE J6

    17 1 UNIT PEKERJAAN KUSEN BOUVENLICH TYPE B1

    18 1 UNIT PEKERJAAN KUSEN BOUVENLICH TYPE B2

    19 1 UNIT PEKERJAAN KUSEN BOUVENLICH TYPE B3

    20 1 UNIT PINTU BESI BAJA PANIC EXIT SETARA KEND (PABRIKAN) PB3

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    31/58

    1 1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK -

    Kayu Balok 5/7 m3 0.1200

    Paku 2"-3" Kg 0.0200

    Kayu Papan 3/20 m3 0.0070

    Pekerja Orang 0.1000

    Tukang Kayu Orang 0.1000

    Kepala Tukang Orang 0.0100

    Mandor Orang 0.0050

    Jumlah -

    Jasa Kontraktor -

    2 1 M2 KANTOR SEMENTARA LANTAI PLESTERAN -

    Dolken Kayu 400 CM Batang 1.2500

    Kayu m3 0.1800

    Paku Biasa Kg 0.0800

    Besi Strip Kg 1.1000

    Semen Portland Kg 35.0000Pasir Pasang m3 0.1500

    Pasir Beton m3 0.1000

    Koral Beton m3 0.1500

    Bata Merah Bh 30.0000

    Seng Plat Lbr 0.2500

    Jendela Naco Bh 0.2000

    Kaca Polos m2 0.0800

    Kunci Tanam Bh 0.1500

    Plywood 4mm Lbr 0.0600

    Pekerja Orang 2.0000

    Tukang Kayu Orang 2.0000

    Tukang Batu Orang 1.0000

    Kepala Tukang Orang 0.3000

    Mandor Orang 0.0500

    Jumlah -Jasa Kontraktor -

    3 1 M2 GUDANG SEMEN DAN PERALATAN -

    Dolken Kayu 400 CM Batang 1.7000

    Kayu m3 0.2100

    Paku Biasa Kg 0.3000

    Semen Portland kg 10.5000

    Pasir Beton m3 0.0300

    Koral Beton m3 0.0500

    Seng Gelombang Lbr 1.5000

    Seng Plat Lbr 0.2500

    Pekerja OH 1.0000

    Tukang Kayu OH 2.0000

    Kepala Tukang OH 0.2000

    Mandor OH 0.0500

    Jumlah -

    Jasa Kontraktor -

    TOTAL (RP)

    ANALISA HARGA PEKERJAAN

    PEKERJAAN PEMBANGUNAN GEDUNG KANTOR BALAI PSDA Ws. CITARUM

    JL. SMK 6 - SOEKARNO HATTA - KOTA BANDUNG

    TAHUN 2016

    No. URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH (RP)

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    32/58

    TOTAL (RP)No. URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH (RP)

    4 1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 M -

    Dolken Kayu 400 CM Batang 1.2500

    Semen Portland Kg 2.5000

    Seng Gelombang Lbr 1.2000

    Pasir Beton m 0.0050

    Koral Beton m 0.0090

    Kayu 5/7 m 0.0720

    Paku Biasa 2"-5" Kg 0.0600

    Meni Besi Liter 0.4500

    Pekerja Orang 0.2000

    Tukang Kayu Orang 0.4000

    Kepala Tukang Orang 0.0200

    Mandor Orang 0.0200

    Jumlah -

    Jasa Kontraktor -

    5 1 M2 PEMBERSIHAN DAN PERATAAN LAPANGAN -

    Pekerja Orang 0.1000

    Mandor Orang 0.0500

    Jumlah -

    Jasa Kontraktor -

    6 1 M3 PEMBONGKARAN DINDING BATA -

    Pekerja Orang 6.6670

    Mandor Orang 0.3330

    Jumlah -

    Jasa Kontraktor -

    7 1 UNIT PAPAN NAMA PROYEK 80 X 120 CM -

    Kayu Meranti m3 0.0500

    Seng Plat m2 1.6200

    Paku kg 0.6000

    Cat Kayu kg 1.5000

    Beton Cor 1 : 2 : 3 m3 0.1000

    Pekerja Orang 2.0000

    Tukang Kayu Orang 1.0000

    Tukang Cat Orang 1.0000

    Mandor Orang 1.0000

    Jumlah -Jasa Kontraktor -

    8 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 1 M -

    Pekerja Orang 0.7500

    Mandor Orang 0.2500

    Jumlah -

    Jasa Kontraktor -

    9 1 M3 GALIAN TANAH BIASA KEDALAMAN MAX 2 M -

    Pekerja Orang 0.9000

    Mandor Orang 0.0450

    Jumlah -

    Jasa Kontraktor -

    10 1 M3 GALIAN TANAH DENGAN ALAT BERAT -Pekerja Orang 0.1088

    Mandor Orang 0.0544

    Excavator 80 -140 Hp Jam 0.0400

    Dump truk Jam 0.0040

    Jumlah -

    Jasa Kontraktor -

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    33/58

    TOTAL (RP)No. URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH (RP)

    11 1 M3 PEKERJAAN TIMBUNAN TANAH DARI LUAR -

    Tanah timbunan m3 1.2000

    Pekerja Orang 0.3480

    Mandor Orang 0.0872

    Excavator 80 - 140 HP jam 0.0109

    Dump truck (Kap. 3,5 T) jam 0.5143

    Jumlah -

    Jasa Kontraktor -

    12 1 M3 URUGAN KEMBALI TANAH BEKAS GALIAN -

    Pekerja Orang 0.5000

    Mandor Orang 0.0500

    Jumlah -

    Jasa Kontraktor -

    13 1 M3 BUANGAN TANAH KELUAR LOKASI SEJAUH 30 METER -

    Pekerja Orang 0.3300

    Mandor Orang 0.0100

    Jumlah -

    Jasa Kontraktor -

    14 1 M3 PEMADATAN TANAH (PER 20 CM) -

    Pekerja Orang 0.3300

    Mandor Orang 0.0100

    Jumlah -

    Jasa Kontraktor -

    15 1 M3 MENGURUG PASIR URUG -

    Pasir Urug m3 1.2000

    Pekerja Orang 0.3000

    Mandor Orang 0.0100

    Jumlah -

    Jasa Kontraktor -

    16 1 M3 URUGAN SIRTU PADAT -

    Sirtu m3 1.2000

    Pekerja Orang 0.2500

    Mandor Orang 0.0250

    Jumlah -Jasa Kontraktor -

    17 1 M3 PASANG PONDASI BATU BELAH (1PC : 5PS) -

    Batu Belah m3 1.2000

    Semen kg 136.0000

    Pasir Pasang m3 0.5440

    Pekerja Orang 1.5000

    Tukang Batu Orang 0.7500

    Kepala Tukang Orang 0.0750

    Mandor Orang 0.0750

    Jumlah -

    Jasa Kontraktor -

    18 1 M3 PASANG BATU KOSONG / AANSTAMPING -

    Batu Belah m3 1.2000Pasir Urug m3 0.4320

    Pekerja Orang 0.7800

    Tukang Batu Orang 0.3900

    Kepala Tukang Batu Orang 0.0390

    Mandor Orang 0.0390

    Jumlah -

    Jasa Kontraktor -

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    34/58

    TOTAL (RP)No. URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH (RP)

    19 1 M2 PASANG DINDING BATA MERAH 1/2 BT (1PC : 3PS) -

    Bata Merah Buah 70.0000

    Semen PC 50kg Kg 14.3700

    Pasir Pasang m3 0.0400

    Pekerja Orang 0.3000

    Tukang Batu Orang 0.1000

    Kepala Tukang Orang 0.0100

    Mandor Orang 0.0150

    Jumlah -

    Jasa Kontraktor -

    20 1 M2 PASANG DINDING BATA MERAH 1/2 BT (1PC : 5PS) -

    Bata Merah Buah 70.0000

    Semen PC 50kg kg 9.6800

    Pasir Pasang m3 0.0450

    Pekerja Orang 0.3000

    Tukang Batu Orang 0.1000

    Kepala Tukang Orang 0.0100

    Mandor Orang 0.0150

    Jumlah -

    Jasa Kontraktor -

    21 1 M2 PLESTERAN DINDING 1 : 3 T= 15 mm -

    Semen PC 50kg Kg 7.7760

    Pasir Pasang m3 0.0230

    Pekerja Orang 0.3000

    Tukang Batu Orang 0.1500

    Kepala Tukang Orang 0.0150

    Mandor Orang 0.0150

    Jumlah -

    Jasa Kontraktor -

    22 1 M2 PLESTERAN DINDING 1 : 5 T= 15 mm -

    Semen PC 50kg Kg 5.1840

    Pasir Pasang m3 0.0260

    Pekerja Orang 0.3000

    Tukang Batu Orang 0.1500

    Kepala Tukang Orang 0.0150

    Mandor Orang 0.0150Jumlah -

    Jasa Kontraktor -

    23 1 M2 PEMASANGAN ACIAN DINDING -

    Semen PC 50kg Kg 3.2500

    Pekerja Orang 0.2000

    Tukang Batu Orang 0.1000

    Kepala Tukang Orang 0.0100

    Mandor Orang 0.0100

    Jumlah -

    Jasa Kontraktor -

    24 1 M2 PASANG DINDING BATU ANDESIT -

    Batu andesit m2 1.1000

    Semen PC 50kg kg 11.7500Pasir Pasang m3 0.0350

    Pekerja Orang 0.7000

    Tukang Batu Orang 0.3500

    Kepala Tukang Orang 0.0350

    Mandor Orang 0.0350

    Jumlah -

    Jasa Kontraktor -

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    35/58

    TOTAL (RP)No. URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH (RP)

    25 1 M2 DAUN PINTU PANEL KAYU KAMPER BANJAR -

    Papan Kayu m3 0.0400

    Lem kayu kg 0.5000

    Pekerja org 1.0000

    Tukang kayu org 2.0000

    Kepala tukang org 0.3000

    Mandor org 0.0500

    Jumlah -

    Jasa Kontraktor -

    26 1 M2 DAUN PINTU PLYWOOD RANGKAP, RANGKA EKSPOSED KAYU KAMPER BANJAR -

    Papan kayu m3 0.0256

    Paku 1 cm - 2,5 cm kg 0.0300

    Lem kayu kg 0.5000

    Plywood 4 mm lbr 1.3750

    HPL WARNA lbr 1.3750

    Pekerja org 0.8000

    Tukang kayu org 2.4000

    Kepala tukang org 0.2400

    Mandor org 0.0400

    Jumlah -

    Jasa Kontraktor -

    27 1 M2 DAUN PINTU PLYWOOD 4 MM + FORMIKA 4 MM RANGKA EKSPOSED KAYU KAMPER BANJAR -

    Kayu Kamper , Papan m3 0.0256

    Paku 1 cm - 2,5 cm kg 0.0300

    Lem kayu kg 0.5000

    Plywood 4 mm lbr 0.6875

    Formika 4 mm lbr 0.6875

    Pekerja org 0.8000

    Tukang kayu org 2.4000

    Kepala tukang org 0.2400

    Mandor org 0.0400

    Jumlah -

    Jasa Kontraktor -

    28 1 M2 DAUN PINTU KACA RANGKA EKSPOSED KAYU KAMPER BANJAR TANPA KACA -

    Papan kayu m3 0.0256

    Paku 1 cm - 2,5 cm kg 0.0300Lem kayu kg 0.5000

    HPL WARNA lbr 0.6875

    Pekerja org 0.8000

    Tukang kayu org 2.4000

    Kepala tukang org 0.2400

    Mandor org 0.0400

    Jumlah -

    Jasa Kontraktor -

    29 1 M2 DAUN PINTU BESI PLAT TEBAL 2 MM RANGKAP (RANGKA BAJA SIKU) -

    Besi siku L 30.30.3 kg 15.0000

    Besi plat baja kg 32.8000

    Kawat las listrik kg 0.0500

    Pekerja org 1.0500

    Tukang las org 1.0500Kepala tukang org 0.1050

    Mandor org 0.0520

    Jumlah -

    Jasa Kontraktor -

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    36/58

    TOTAL (RP)No. URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH (RP)

    30 1 M2 JALUSI BESI STRIP (2 x 3 MM) -

    Besi strip kg 6.1770

    Kawat las listrik kg 0.0500

    Pekerja org 1.6700

    Tukang las org 1.6700

    Kepala tukang org 0.1670

    Mandor org 0.0830

    Jumlah -

    Jasa Kontraktor -

    31 1 M KUSEN ALUMINIUM -

    Kusen alumunium 4" warna m' 1.1000

    fiser + skruf S=8mm, pj=2" bh 2.0000

    Sealant tb 0.0600

    Pekerja Oh 0.0430

    Tukang Alumunium Oh 0.0430

    Kepala Tukang Oh 0.0043

    Mandor Oh 0.0021

    Jumlah -

    Jasa Kontraktor -

    32 1 M2 DAUN PINTU KACA RANGKA ALUMUNIUM TANPA KACA -

    Kusen alumunium 4" warna m' 1.1000

    fiser + skruf S=8mm, pj=2" bh 2.0000

    Silikon tb 0.0600

    Pekerja Oh 0.0430

    Tukang Alumunium Oh 0.0430

    Kepala Tukang Oh 0.0043

    Mandor Oh 0.0021

    Jumlah -

    Jasa Kontraktor -

    33 1 M2 PASANG KACA TEBAL 5 MM -

    Kaca bening t=5 mm m' 1.1000

    Sealant kg 0.0500

    Pekerja Oh 0.0150

    Tukang Kayu Oh 0.1500

    Kepala Tukang Oh 0.0150

    Mandor Oh 0.0080Jumlah -

    Jasa Kontraktor -

    34 1 M2 PASANG KACA TEBAL 8 MM -

    Kaca bening t=8 mm m' 1.1000

    Sealant kg 0.0700

    Pekerja Oh 0.0170

    Tukang Kayu Oh 0.1700

    Kepala Tukang Oh 0.0170

    Mandor Oh 0.0090

    Jumlah -

    Jasa Kontraktor -

    35 1 M2 PASANG KACA TEMPERRED TEBAL 10 MM -

    Kaca temperred t=10 mm m' 1.1000Sealant kg 0.0700

    Pekerja Oh 0.0170

    Tukang Kayu Oh 0.1700

    Kepala Tukang Oh 0.0170

    Mandor Oh 0.0090

    Jumlah -

    Jasa Kontraktor -

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    37/58

    TOTAL (RP)No. URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH (RP)

    36 1 M2 PASANG KACA TEMPERRED TEBAL 12 MM -

    Kaca temperred bening t=12 mm m' 1.1000

    Sealant kg 0.0700

    Pekerja Oh 0.0170

    Tukang Kayu Oh 0.1700

    Kepala Tukang Oh 0.0170

    Mandor Oh 0.0090

    Jumlah -

    Jasa Kontraktor -

    37 1 M2 PASANG KACA CERMIN TEBAL 5 MM -

    Kaca cermin t=5 mm m' 1.1000

    Pekerja Oh 0.0150

    Tukang Kayu Oh 0.1500

    Kepala Tukang Oh 0.0150

    Mandor Oh 0.0080

    Jumlah -

    Jasa Kontraktor -

    38 1 M2 RANGKA PLAFOND BESI HOLLOW 1x40.40.2mm, MODUL 60x60 cm -

    Rangka hollow 40.40.2 mm m' 4.0000

    Assesoris (perkuatan, las, skrup, dll) 100%xrangka Ls 1.0000

    Pekerja Orang 0.3500

    Tukang besi Orang 0.3500

    Kepala tukang Orang 0.0350

    Mandor Orang 0.0180

    Jumlah -

    Jasa Kontraktor -

    39 1 M2 RANGKA PLAFOND BESI HOLLOW 1x40.40.2mm, MODUL 60x60 cm (DROP CEILLING) -

    Rangka hollow 40.40.2 mm m' 6.0000

    Assesoris (perkuatan, las, skrup, dll) 100%xrangka Ls 1.0000

    Pekerja Orang 0.3500

    Tukang besi Orang 0.3500

    Kepala tukang Orang 0.0350

    Mandor Orang 0.0180

    Jumlah -

    Jasa Kontraktor -

    40 1 M2 PASANG PLAFOND GYPSUM 9 mm -

    Gypsum 9mm lbr 0.3640

    Paku skrup kg 0.1100

    Pekerja Orang 0.1000

    Tukang Kayu Orang 0.0500

    Kep. Tukang Kayu Orang 0.0050

    Mandor Orang 0.0050

    Jumlah -

    Jasa Kontraktor -

    41 1 M2 PASANGAN PLAFOND GYPSUM WET AREA 9 mm -

    Gypsum wet area 9 mm lbr 0.3640

    Paku skrup kg 0.1100

    Pekerja Orang 0.1000

    Tukang Kayu Orang 0.0500Kep. Tukang Kayu Orang 0.0050

    Mandor Orang 0.0050

    Jumlah -

    Jasa Kontraktor -

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    38/58

    TOTAL (RP)No. URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH (RP)

    42 1 M' PASANG LIST PROFIL PLAFOND GYPSUM -

    List Profil Gypsum m 1.0500

    Cornise Compound kg 0.3000

    Pekerja Orang 0.0500

    Tukang Kayu Orang 0.0500

    Kepala Tukang Orang 0.0050

    Mandor Orang 0.0030

    Jumlah -

    Jasa Kontraktor -

    43 1 M2 PEMASANGAN LANTAI GRANIT TILE 60 x 60 CM POLISHED -

    Lantai granit tile 60x60 cm polished m2 1.1000

    Semen PC 50 kg kg 9.8000

    Semen Warna Kg 1.3000

    Pasir Pasang m3 0.0450

    Pekerja Orang 0.2500

    Tukang Batu Orang 0.1250

    Kepala Tukang Orang 0.0130

    Mandor Orang 0.0130

    Jumlah -

    Jasa Kontraktor -

    44 1 M2 PEMASANGAN LANTAI GRANIT TILE 60 x 60 CM UNPOLISHED -

    Lantai granit tile 60x60 cm unpolished m2 1.1000

    Semen PC 50 kg kg 9.8000

    Semen Warna Kg 1.3000

    Pasir Pasang m3 0.0450

    Pekerja Orang 0.2500

    Tukang Batu Orang 0.1250

    Kepala Tukang Orang 0.0130

    Mandor Orang 0.0130

    Jumlah -

    Jasa Kontraktor -

    45 1 M2 PEMASANGAN LANTAI GRANIT TILE 30 x 60 CM POLISHED -

    Lantai granit tile 30x60 cm polished m2 1.1000

    Semen PC 50 kg kg 9.8000

    Semen Warna Kg 1.3000

    Pasir Pasang m3 0.0450Pekerja Orang 0.2500

    Tukang Batu Orang 0.1250

    Kepala Tukang Orang 0.0130

    Mandor Orang 0.0130

    Jumlah -

    Jasa Kontraktor -

    46 1 M2 PEMASANGAN LANTAI KERAMIK 40 x 40 CM -

    Keramik 40 x 40 m2 1.1000

    Semen PC 50 kg kg 8.1900

    Semen Warna Kg 1.6200

    Pasir Pasang m3 0.0450

    Pekerja Orang 0.7000

    Tukang Batu Orang 0.3500

    Kepala Tukang Orang 0.0350Mandor Orang 0.0350

    Jumlah -

    Jasa Kontraktor -

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    39/58

    TOTAL (RP)No. URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH (RP)

    47 1 M2 PEMASANGAN LANTAI KERAMIK 30 x 30 CM ANTI SLIP -

    Keramik 30 x 30 anti slip m2 1.1000

    Semen PC 50 kg kg 10.0000

    Semen Warna Kg 1.5000

    Pasir Pasang m3 0.0450

    Pekerja Orang 0.7000

    Tukang Batu Orang 0.3500

    Kepala Tukang Orang 0.0350

    Mandor Orang 0.0350

    Jumlah -

    Jasa Kontraktor -

    48 1 M2 PEMASANGAN LANTAI KERAMIK 20 x 20 CM ANTI SLIP -

    Keramik 20 x 20 anti slip m2 1.1000

    Semen PC 50 kg Kg 10.4000

    Semen Warna Kg 1.6200

    Pasir Pasang m3 0.0450

    Pekerja Orang 0.7000

    Tukang Batu Orang 0.3500

    Kepala Tukang Orang 0.0350

    Mandor Orang 0.0350

    Jumlah -

    Jasa Kontraktor -

    49 1 M2 PEMASANGAN LANTAI KERAMIK 30 x 30 CM PUTIH -

    Keramik 30 x 30 m2 1.1000

    Semen PC 50 kg Kg 10.4000

    Semen Warna Kg 1.6200

    Pasir Pasang m3 0.0450

    Pekerja Orang 0.7000

    Tukang Batu Orang 0.3500

    Kepala Tukang Orang 0.0350

    Mandor Orang 0.0350

    Jumlah -

    Jasa Kontraktor -

    50 1 M2 PEMASANGAN LANTAI PEARLSTONE -

    Batu pearlstone m2 1.1000

    Semen PC 50 kg Kg 8.1900Semen Warna Kg 1.6200

    Pasir Pasang m3 0.0450

    Pekerja Orang 0.7000

    Tukang Batu Orang 0.3500

    Kepala Tukang Orang 0.0350

    Mandor Orang 0.0350

    Jumlah -

    Jasa Kontraktor -

    51 1 M2 PEMASANGAN GRANIT ALAM -

    Granit alam m2 1.0600

    Semen PC 50kg kg 12.4400

    Semen warna Kg 0.6500

    Pasir Pasang m3 0.0250

    Paku 12 cm bh 3.0300Pekerja Orang 1.3000

    Tukang Batu Orang 0.6500

    Kepala Tukang Orang 0.0650

    Mandor Orang 0.0650

    Jumlah -

    Jasa Kontraktor -

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    40/58

    TOTAL (RP)No. URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH (RP)

    52 1 M2 PEMASANGAN DINDING KERAMIK 30 x 60 CM -

    Dinding keramik 30 x 60 cm m2 1.0500

    Semen PC 50 kg Kg 9.3000

    Semen Warna Kg 1.9400

    Pasir Pasang m3 0.0180

    Pekerja Orang 0.9000

    Tukang Batu Orang 0.4500

    Kepala Tukang Orang 0.0450

    Mandor Orang 0.0450

    Jumlah -

    Jasa Kontraktor -

    53 1 M2 PEMASANGAN DINDING KERAMIK 20 x 40 CM -

    Dinding keramik 20 x 40 cm M2 1.0500

    Semen PC 50kg kg 9.3000

    Semen warna Kg 1.9400

    Pasir Pasang m3 0.0180

    Pekerja Orang 0.9000

    Tukang Batu Orang 0.4500

    Kepala Tukang Orang 0.0450

    Mandor Orang 0.0450

    Jumlah -

    Jasa Kontraktor -

    54 1 M' PEMASANGAN PLINT GRANIT TILE 10 x 60 CM -

    Plint granite tile 10x60 BH 1.7700

    Semen PC 50kg kg 1.1400

    Semen warna Kg 0.1000

    Pasir Pasang m3 0.0030

    Pekerja Orang 0.0900

    Tukang Batu Orang 0.0900

    Kepala Tukang Orang 0.0090

    Mandor Orang 0.0050

    Jumlah -

    Jasa Kontraktor -

    55 1 M' PEMASANGAN PLINT KERAMIK 10 x 40 CM -

    Plint keramik 10x40 BH 2.6500

    Semen PC 50kg kg 1.1400Semen warna Kg 0.1000

    Pasir Pasang m3 0.0030

    Pekerja Orang 0.0900

    Tukang Batu Orang 0.0900

    Kepala Tukang Orang 0.0090

    Mandor Orang 0.0050

    Jumlah -

    Jasa Kontraktor -

    56 1 M' PEMASANGAN PLINT KERAMIK 10 x 30 CM -

    Plint keramik 10x30 BH 3.5300

    Semen PC 50kg kg 1.1400

    Semen warna Kg 0.1000

    Pasir Pasang m3 0.0030

    Pekerja Orang 0.0900Tukang Batu Orang 0.0900

    Kepala Tukang Orang 0.0090

    Mandor Orang 0.0050

    Jumlah -

    Jasa Kontraktor -

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    41/58

    TOTAL (RP)No. URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH (RP)

    57 1 M' PEMASANGAN BORDER DINDING KERAMIK KM/WC 8 x 30 CM -

    Border dinding keramik KM/WC BH 3.4965

    Semen PC 50kg kg 1.1400

    Semen warna Kg 0.0250

    Pasir Pasang m3 0.0030

    Pekerja Orang 0.0900

    Tukang Batu Orang 0.0900

    Kepala Tukang Orang 0.0350

    Mandor Orang 0.0350

    Jumlah -

    Jasa Kontraktor -

    58 1 M2 PEMASANGAN BORDER DINDING KERAMIK KM/WC 8 x 20 CM -

    Border dinding keramik KM/WC BH 5.3000

    Semen PC 50kg kg 1.1400

    Semen warna Kg 0.0250

    Pasir Pasang m3 0.0030

    Pekerja Orang 0.0900

    Tukang Batu Orang 0.0900

    Kepala Tukang Orang 0.0350

    Mandor Orang 0.0350

    Jumlah -

    Jasa Kontraktor -

    59 1 M' PASANG STEPNOSING KERAMIK TILE 10/30 -

    Step nosing granit keramik tile bh 1.7535

    Semen PC 50 kg kg 9.8000

    Semen Warna Kg 1.3000

    Pasir Pasang m3 0.0450

    Pekerja Orang 0.2500

    Tukang Batu Orang 0.1250

    Kepala Tukang Orang 0.0130

    Mandor Orang 0.0130

    Jumlah -

    Jasa Kontraktor -

    60 1 M2 PENGECATAN DINDING DAN PLAFOND INTERIOR -

    Plamur Kg 0.1000

    Cat dasar interior Kg 0.1000Cat penutup Kg 0.2600

    Pekerja Orang 0.0200

    Tukang Cat Orang 0.0630

    Kepala Tukang Orang 0.0063

    Mandor Orang 0.0030

    Jumlah -

    Jasa Kontraktor -

    61 1 M2 PENGECATAN DINDING EKSTERIOR/WEATHER SHIELD -

    Cat dasar ekterior Kg 0.1000

    Cat penutup Kg 0.2600

    Pekerja Orang 0.0200

    Tukang Cat Orang 0.0630

    Kepala Tukang Orang 0.0063

    Mandor Orang 0.0030Jumlah -

    Jasa Kontraktor -

    62 1 M2 PENGECATAN DINDING/LANTAI DENGAN CAT EPOXY -

    Cat dasar epoxy Kg 0.1000

    Cat epoxy Kg 0.2600

    Pekerja Orang 0.0200

    Tukang Cat Orang 0.0630

    Kepala Tukang Orang 0.0063

    Mandor Orang 0.0030

    Jumlah -

    Jasa Kontraktor -

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    42/58

    TOTAL (RP)No. URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH (RP)

    63 1 M2 PENGECATAN KAYU -

    Meni kayu kg 0.2000

    Plamir kayu kg 0.1500

    Cat dasar kg 0.1700

    Cat kayu kg 0.3500

    Kuas bh 0.0100

    Pengencer kg 0.0300

    Ampelas Lbr 0.2000

    Pekerja Orang 0.0700

    Tukang Cat Orang 0.1050

    Kepala Tukang Orang 0.0040

    Mandor Orang 0.0030

    Jumlah -

    Jasa Kontraktor -

    64 1 M2 PENGECATAN BESI SECARA SEMPROT SISTEM 3 LAPIS CAT -

    Cat besi kg 0.3000

    Pengencer liter 0.0100

    Pekerja Orang 0.4000

    Tukang Cat Orang 0.7000

    Kepala Tukang Orang 0.0700

    Mandor Orang 0.0200

    Jumlah -

    Jasa Kontraktor -

    65 1 M2 PEKERJAAN WATERPROOFING MEMBRAN -

    Watter profing membrane t=4 mm m 1.0500

    Material bantu ls 1.0000

    Pekerja Orang 0.1000

    Tukang kayu Orang 0.0500

    Kepala Tukang Orang 0.0050

    Mandor Orang 0.0010

    Jumlah -

    Jasa Kontraktor -

    66 1 M2 PASANG DOUBLE ALUMUNIUM FOIL -

    Alumunium foil double m2 2.1000

    Pekerja Oh 0.1500

    tukang kayu Oh 0.0500kepala tukang Oh 0.0050

    Mandor Oh 0.0080

    Jumlah -

    Jasa Kontraktor -

    67 1 M2 PARTISI DOUBLE GYPSUM RANGKA METAL STUD -

    Panel Gypsum 9 mm lbr 0.6944

    Rangka metal stud m' 5.0000

    Pekerja org 0.1969

    Tukang Kayu org 0.1050

    Kep. Tukang Kayu org 0.0394

    Mandor org 0.0105

    Jumlah -

    Jasa Kontraktor -

    68 1 M' PASANG PLINT KAYU KAMPER 2x10 -

    Papan kayu m3 0.0030

    Paku/skrup 5 cm kg 0.0500

    Pekerja orang 0.1200

    Tukang Kayu orang 0.1200

    Kepala Tukang orang 0.0120

    Mandor orang 0.0060

    Jumlah -

    Jasa Kontraktor -

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    43/58

    TOTAL (RP)No. URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH (RP)

    69 1 UNIT BAK KONTROL 100 X 100 X 50 -

    Lantai Kerja t. 10 cm m3 0.1000

    Pasir Urug t. 10 cm m3 0.1000

    Pasangan 1/2 bata 1:3 m2 1.1400

    Plesteren 1:3 m2 2.2800

    Acian m2 2.2800

    Galian m3 1.1520

    Urugan kembali m3 0.6520

    Jumlah -

    70 1 M' PASANG SALURAN GRAVEL U - 25 CM -

    Galian Tanah m3 0.0450

    Urugan pasir m3 0.0500

    Grevel U - 25 cm bh 3.3333

    Pas. 1/2 Bata 1 : 3 m3 0.0900

    Plesteran + Acian 1 : 3 m2 0.8000

    Jumlah -

    71 1 M' PASANG SALURAN GRAVEL U - 30 CM -

    Galian Tanah m3 0.0450

    Urugan pasir m3 0.0500

    Grevel U - 30 cm bh 3.3333

    Pas. 1/2 Bata 1 : 3 m3 0.0900

    Plesteran + Acian 1 : 3 m2 0.8000

    Jumlah -

    72 1 M2 GLASSBOX uk. 200 x 200 mm -

    Glassbox uk. 200 x 200 mm bh 25.0000

    Spesi 1Pc : 2Ps

    - Semen Portland kg 16.3500

    - Pasir Pasang m 0.0260

    Sealant ls 1.0000

    Jumlah -

    Jasa Kontraktor -

    73 1 M2 PEKERJAAN LAPISAN PONDASI AGREGAT KELAS B (LPB) -

    Matrial agregat B m 1.2586

    Pekerja Oh 0.3968

    Mandor Oh 0.5680Wheel loader jam 0.0710

    Dump truck jam 0.5022

    Motor grader jam 0.0430

    Tandem roller jam 0.0134

    Water tanker jam 0.0141

    Jumlah -

    Jasa Kontraktor -

    74 1 M2 PEKERJAAN LAPISAN PONDASI AGREGAT KELAS A (LPA) -

    Matrial agregat A m 1.2586

    Pekerja Oh 0.3968

    Mandor Oh 0.5680

    Wheel loader jam 0.0710

    Dump truck jam 0.5022

    Motor grader jam 0.0430Tandem roller jam 0.0134

    Water tanker jam 0.0141

    Jumlah -

    Jasa Kontraktor -

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    44/58

    TOTAL (RP)No. URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH (RP)

    75 1 M2 PEKERJAAN LAPISAN AC/WC HOTMIX (t = 3 cm) -

    Batu pecah mesin 1 - 2 cm m 0.7710

    Pasir aspal m 0.7450

    Semen kg 49.1700

    Asphalt ton 0.0540

    Anti stripping agent kg 0.1600

    Pekerja org 1.6064

    Mandor org 0.1608

    Wheel loader Jam 0.0119

    AMP Jam 0.0201

    Genset Jam 0.0201

    Dump Truck Jam 0.3698

    Asphalt finisher Jam 0.0137

    Tandem roller Jam 0.0135

    Pnematic tire roller Jam 0.0058

    Jumlah -

    Harga per M2 (Jumlah/33,33) -

    Jasa Kontraktor -

    76 1 BH MEMASANG CLOSET DUDUK/MONOBLOCK -

    Closet duduk Unit 1.0000

    Perlengkapan (6% dari harga barang) Ls 0.0600

    Pekerja org 0.2033

    Mandor org 0.0032

    Jumlah -

    Jasa Kontraktor -

    77 1 BH MEMASANG CLOSET JONGKOK -

    Closet jongkok Unit 1.0000

    Semen portland kg 6.0000

    Pasir pasang m3 0.0100

    Pekerja org 0.2033

    Mandor org 0.0032

    Jumlah -

    Jasa Kontraktor -

    78 1 BH MEMASANG URINOIR -

    Urinoir Unit 1.0000

    Semen portland kg 6.0000Pasir pasang m3 0.0100

    Perlengkapan (30% dari harga barang) Ls 0.3000

    Pekerja org 0.2033

    Mandor org 0.0032

    Jumlah -

    Jasa Kontraktor -

    79 1 BH MEMASANG SEKAT URINOIR -

    Sekat urinoir Unit 1.0000

    Semen portland kg 6.0000

    Pasir pasang m3 0.0100

    Perlengkapan (30% dari harga barang) Ls 0.3000

    Pekerja org 0.2033

    Mandor org 0.0032

    Jumlah -Jasa Kontraktor -

    80 1 BH MEMASANG WASTAFEL -

    Wastafel Unit 1.0000

    Semen portland kg 6.0000

    Pasir pasang m3 0.0100

    Perlengkapan (12% dari harga barang) Ls 0.1200

    Pekerja org 0.2033

    Mandor org 0.0032

    Jumlah -

    Jasa Kontraktor -

  • 7/25/2019 Bab.XIII. Daftar Kuantitas dan Harga Citarum.pdf

    45/58

    TOTAL (RP)No. URAIAN SATUAN KOEFISIEN HARGA SATUAN JUMLAH (RP)

    81 1 BH MEMASANG KITCHENZINC -

    Kitchenzinc Unit 1.0000

    Pekerja org 0.0300

    Mandor org 0.0150

    Jumlah -

    Jasa Kontraktor -

    82 1 BH MEMASANG FLOORDRAIN -

    Floor drain Unit 1.0000

    Pekerja org 0.0100

    Mandor org 0.0050

    Jumlah -

    Jasa Kontraktor -

    83 1 BH MEMASANG KRAN AIR -

    Kran air Unit 1.0000

    Sealtape bh 0.0250

    Pekerja org 0.0100

    Mandor org 0.0050

    Jumlah -

    Jasa Kontraktor -

    84 1 BH MEMASANG JET WASHER -

    Kran air Unit 1.0000

    Sealtape bh 0.0250

    Pekerja org 0.0100

    Mandor org 0.0050

    Jumlah -

    Jasa Kontraktor -

    85 1 UNIT CUBICLE PARTISI TOILET LENGKAP ASESORIES -

    Partisi Phenolic resin Board tebal 12mm ls 1.0000

    Pintu Phenolic resin Board 800x1800x12 mm

    Door hardware stainless steel accessories

    Rangka frame alumunium

    Kaki pedestal dan Screw conection stainless steel

    Upah kerja ls 1.0000

    Jumlah -

    Jasa Kontraktor -

    86 1 M' RAILING TANGGA STAINLESS -

    Pipa Stainless Steel 2 1/2" m' 1.7000

    Pipa Stainless Steel 1/2" m' 3.0000

    Asesoris + baut (5% dari bahan) Ls 0.0500

    Upah Pabrikasi & Stel (5% dari bahan) Ls 0.0500

    Jumlah -

    Jasa Kontraktor -

    87 1 M' HAND RAILING TANGGA STAINLESS -

    Pipa Stainless Steel 2 1/2" m' 1.0000

    Asesoris + baut (5% dari bahan) Ls 0.0500

    Upah Pabrikasi & Stel (5% dari bahan) Ls 0.0500

    Jumlah -

    Jasa Kontraktor -