analisa sni

59
RAB - 01 DAFTAR HARGA SATUAN BAHAN URAIAN BAHAN Keterangan HRG SATUAN MATERIAL SEMEN naik 5% Semen PC / 50 kg 65,000.00 Semen Putih 40 kg (ex Tiga Roda) 84,000.00 Semen warna 10,500.00 Semen Merah 183,750.00 MATERIAL MORTAR UTAMA (MU) naik 5% Plester premium (MU 100) 63,000.00 Plester trasraam (MU 101) 94,500.00 Acian plesteran / beton expose (MU 200) 166,425.00 Acian plesteran (MU 250) 101,850.00 Acian profil (MU 260) 200,025.00 Acian putih (MU 270) Perekat keramik area lembab 163,800.00 Finish plester (MU 290) 101,850.00 Pasangan bata (MU 300) 53,025.00 Pasangan & plesteran bata (MU 301) 60,375.00 Perekat bata ringan (MU 380) 157,500.00 Perekat keramik dinding (MU 400) 142,800.00 Pengisi naad keramik (MU 408) 12,075.00 Perata lantai (MU 440) 56,700.00 Perata lantai premium (MU 445) 103,950.00 Perekat keramik lantai (MU450) 204,750.00 Perekat keramik daerah basah (MU 460) 449,400.00 Perekat keramik diatas keramik (MU 480) 241,500.00 Multi Purpose Tile Adhesive (MU 485) 1,155,000.00 Fast Setting Tile Adhesive (MU 490) 336,000.00 Perekat mortar & beton / Bonding Agent (MU L-500) 210,525.00 Pelapis kedap air (MU 600) 1,113,000.00 Floor Hardener (MU 700) 144,375.00 Non shrink grout (MU 800) 161,700.00 Perbaikan permukaan beton (MU 830) 269,850.00 Pengisi celah beton / Finish Coat Repair (MU 840) 336,000.00 MATERIAL PASIR, BATU & BATA naik 5% Pasir beton 270,375.00 Pasir extra beton 273,000.00 Pasir Putih (Bangka) 315,000.00 Pasir Pasang 265,125.00 Kapur Padam 210,000.00 Pasir Urug darat 291,375.00 Sirtu 256,200.00 Batu pecah / Split ukuran 1-2 cm 267,750.00 Batu pecah / Split ukuran 2-3 cm 269,500.35 Koral beton 286,125.00 Batu kali belah 257,250.00 Makadam / batu pecah 5-7 cm 262,500.00 Abu batu 5 mm 241,500.00 Sreening 5-13 mm 255,937.50 Batu bata press mesin 700.35 Batu bata uk. 5 x 11 x 23 cm (ukuran besar) proses tangan 630.00 Batu bata uk. 4 x 9.5 x 20 cm (ukuran kecil) proses tangan 512.40 Batu bata ringan (ex Hebel), 10x16x60 cm 889,875.00 8,542.80 Batu bata ringan (ex Hebel), 7x16x60 cm 889,875.00 5,979.96 Batu bata ringan (ex Broco), 10x16x60 cm 889,875.00 8,542.80 Batu bata ringan (ex Broco), 7x16x60 cm 880,687.50 5,918.22 Batako Semen (semen, pasir, abu batu) 9x19x39 cm 4,200.00 Batako Semen (semen, batu apung, pumis) 9x19x39 cm 4,987.50 Glassblock 20/20 31,500.00 Rooster beton 20x20x7 cm 6,063.75 Rooster bata merah 12x11,5x24 cm 5,075.70 Lempengan garis uk. 9x19x39 cm 3,675.00 Tanah merah 262,500.00 I j u k 31,500.00 MATERIAL BESI naik 5% Besi beton polos 13,125.00 Besi beton ulir 13,125.00 Besi plat strip 14,542.50 Baja profil siku 14,455.35 Baja WF 13,125.00 Baja H Beam 14,437.50

Upload: andi-rs

Post on 25-Nov-2015

1.457 views

Category:

Documents


27 download

TRANSCRIPT

XXXX

Bhn & UphPANGKAL PINANGJakartaDAFTAR HARGA SATUAN BAHANHRG JKT (+ %)Jurnal 2013URAIAN BAHANKeteranganHRG SATUANSATUANHarga satuanMATERIAL SEMENnaik 5%SEMEN (+15%)Semen PC / 50 kg65,000.00/zak72,450.0063,000.00Semen Putih 40 kg (ex Tiga Roda)84,000.00/zak92,000.0080,000.00Semen warna10,500.00/Kg11,500.0010,000.00Semen Merah183,750.00/M3201,250.00175,000.00MATERIAL MORTAR UTAMA (MU)naik 5%MORTAR (+15%)Plester premium (MU 100)63,000.00/zak 40Kg69,000.0060,000.00Plester trasraam (MU 101)94,500.00/zak 40Kg103,500.0090,000.00Acian plesteran / beton expose (MU 200)166,425.00/zak 40Kg182,275.00158,500.00Acian plesteran (MU 250)101,850.00/zak 40Kg111,550.0097,000.00Acian profil (MU 260)200,025.00/zak 25Kg219,075.00190,500.00Acian putih (MU 270)Perekat keramik area lembab163,800.00/zak 25Kg179,400.00156,000.00Finish plester (MU 290)101,850.00/zak 40Kg111,550.0097,000.00Pasangan bata (MU 300)53,025.00/zak 40Kg58,075.0050,500.00Pasangan & plesteran bata (MU 301)60,375.00/zak 40Kg66,125.0057,500.00Perekat bata ringan (MU 380)157,500.00/zak 40Kg172,500.00150,000.00Perekat keramik dinding (MU 400)142,800.00/zak 25Kg156,400.00136,000.00Pengisi naad keramik (MU 408)12,075.00/Kg13,225.0011,500.00Perata lantai (MU 440)56,700.00/zak 40Kg62,100.0054,000.00Perata lantai premium (MU 445)103,950.00/zak 40Kg113,850.0099,000.00Perekat keramik lantai (MU450)204,750.00/zak 40Kg224,250.00195,000.00Perekat keramik daerah basah (MU 460)449,400.00/zak 25Kg492,200.00428,000.00Perekat keramik diatas keramik (MU 480)241,500.00/zak 25Kg264,500.00230,000.00Multi Purpose Tile Adhesive (MU 485)1,155,000.00/40Kg set1,265,000.001,100,000.00Fast Setting Tile Adhesive (MU 490)336,000.00/zak 25Kg368,000.00320,000.00Perekat mortar & beton / Bonding Agent (MU L-500)210,525.00/ 2Kg230,575.00200,500.00Pelapis kedap air (MU 600)1,113,000.00/30Kg set1,219,000.001,060,000.00Floor Hardener (MU 700)144,375.00/zak 25Kg158,125.00137,500.00Non shrink grout (MU 800)161,700.00/zak 40Kg177,100.00154,000.00Perbaikan permukaan beton (MU 830)269,850.00/zak 40Kg295,550.00257,000.00Pengisi celah beton / Finish Coat Repair (MU 840)336,000.00/ 25Kg set368,000.00320,000.00MATERIAL PASIR, BATU & BATAnaik 5%PASIR, BATU (+10%)Pasir beton270,375.00/M3283,250.00257,500.00Pasir extra beton273,000.00/M3286,000.00260,000.00Pasir Putih (Bangka)315,000.00/M3330,000.00300,000.00Pasir Pasang265,125.00/M3277,750.00252,500.00Kapur Padam210,000.00/M3220,000.00200,000.00Pasir Urug darat291,375.00/M3305,250.00277,500.00Sirtu256,200.00/M3268,400.00244,000.00Batu pecah / Split ukuran 1-2 cm267,750.00/M3280,500.00255,000.00Batu pecah / Split ukuran 2-3 cm269,500.35/M3282,333.70256,667.00Koral beton286,125.00/M3299,750.00272,500.00Batu kali belah257,250.00/M3269,500.00245,000.00Makadam / batu pecah 5-7 cm262,500.00/M3275,000.00250,000.00Abu batu 5 mm241,500.00/M3253,000.00230,000.00Sreening 5-13 mm255,937.50/M3268,125.00243,750.00Batu bata press mesin700.35/bh733.70667.00Batu bata uk. 5 x 11 x 23 cm (ukuran besar) proses tangan630.00/bh660.00600.00Batu bata uk. 4 x 9.5 x 20 cm (ukuran kecil) proses tangan512.40/bh536.80488.00Batu bata ringan (ex Hebel), 10x16x60 cm889,875.00/M3932,250.00847,500.008,542.80/bh8,949.608,136.00Batu bata ringan (ex Hebel), 7x16x60 cm889,875.00/M3932,250.00847,500.005,979.96/bh6,264.725,695.20Batu bata ringan (ex Broco), 10x16x60 cm889,875.00/M3932,250.00847,500.008,542.80/bh8,949.608,136.00Batu bata ringan (ex Broco), 7x16x60 cm880,687.50/M3922,625.00838,750.005,918.22/bh6,200.045,636.40Batako Semen (semen, pasir, abu batu) 9x19x39 cm4,200.00/bh4,400.004,000.00Batako Semen (semen, batu apung, pumis) 9x19x39 cm4,987.50/bh5,225.004,750.00Glassblock 20/2031,500.00/bh33,000.0030,000.00Rooster beton 20x20x7 cm6,063.75/bh6,352.505,775.00Rooster bata merah 12x11,5x24 cm5,075.70/bh5,317.404,834.00Lempengan garis uk. 9x19x39 cm3,675.00/bh3,850.003,500.00Tanah merah262,500.00/M3275,000.00250,000.00I j u k31,500.00/kg33,000.0030,000.00MATERIAL BESInaik 5%BESI (+10%)Besi beton polos13,125.00/kg13,750.0012,500.00Besi beton ulir13,125.00/kg13,750.0012,500.00Besi plat strip14,542.50/kg15,235.0013,850.00Baja profil siku14,455.35/kg15,143.7013,767.00Baja WF13,125.00/kg13,750.0012,500.00Baja H Beam14,437.50/kg15,125.0013,750.00Baja Kanal C (Channal)14,568.75/kg15,262.5013,875.00Besi plat hitam (segala ukuran)15,750.00/kg16,500.0015,000.00Besi plat putih (segala ukuran)14,595.00/kg15,290.0013,900.00Besi plat bordes26,512.50/kg27,775.0025,250.00Kanal C galvaspan HI-TEN, type C 100.1670,612.50/M'73,975.0067,250.00Kanal C galvaspan HI-TEN, type C 100.2084,525.00/M'88,550.0080,500.00Kanal C galvaspan HI-TEN, type C 125.1673,500.00/M'77,000.0070,000.00Kanal C galvaspan HI-TEN, type C 125.2085,050.00/M'89,100.0081,000.00Kanal C galvaspan HI-TEN, type C 150.1683,737.50/M'87,725.0079,750.00Kanal C galvaspan HI-TEN, type C 150.20105,000.00/M'110,000.00100,000.00Kanal C galvaspan HI-TEN, type C 150.25115,500.00/M'121,000.00110,000.00Kanal C galvaspan HI-TEN, type C 200.16105,000.00/M'110,000.00100,000.00Kanal C galvaspan HI-TEN, type C 200.20131,250.00/M'137,500.00125,000.00Kanal C galvaspan HI-TEN, type C 200.25162,750.00/M'170,500.00155,000.00Besi Wire Mesh DM-8F1, 540 x 210 cm (11,34 M2)567,541.00/lembar52,550.09/M255,052.4850,047.71Besi Wire Mesh DM-7F1, 540 x 210 cm (11,34 M2)434,542.00/lembar40,235.37/M242,151.3438,319.40Besi Wire Mesh DM-6F1, 540 x 210 cm319,271.00/lembar29,562.13/M230,969.8528,154.41Besi Wire Mesh DM-5F1, 540 x 210 cm224,381.00/lembar20,776.02/M221,765.3519,786.68Besi Wire Mesh DM-4, 540 x 210 cm166,126.00/lembar15,382.04/M216,114.5114,649.56Kawat beton20,212.50/kg21,175.0019,250.00Kawat Las31,500.00/m33,000.0030,000.00Kawat duri 10 kg (60 m')165,375.00/roll173,250.00157,500.00Paku halus (2 - 3 cm)19,950.00/kg20,900.0019,000.00Paku ukuran sedang (4 - 5 cm)18,637.50/kg19,525.0017,750.00Paku ukuran sedang (6 - 7 cm)15,356.25/kg16,087.5014,625.00Paku ukuran (10-15 cm)15,356.25/kg16,087.5014,625.00Seng Gelombang 180x90x0,0547,250.00/lmbr49,500.0045,000.00belum di updateSeng Gelombang 180x90x0,0364,050.00/lmbr67,100.0061,000.00Plat Seng tebal 0,5 mm, lebar 90 cm31,500.00/M'33,000.0030,000.00Plat Seng tebal 0,3 mm, lebar 90 cm36,750.00/M'38,500.0035,000.00Paku Seng26,250.00/kg27,500.0025,000.00Hollow 40x40 mm galvanized (tebal standart)Rgk plafond/Partisi5,250.00/M'5,500.005,000.00Hollow 20x40 mm galvanized (tebal standart)Rgk plafond/Partisi5,250.00/M'5,500.005,000.00Hollow 40x40 mm dimenie (tebal standart)Rgk plafond/Partisi6,300.00/M'6,600.006,000.00Hollow 20x40 mm dimenie (tebal standart)Rgk plafond/Partisi4,725.00/M'4,950.004,500.00Metal Furing 75 mmRgk plafond/Partisi9,450.00/M'9,900.009,000.00Hollow 40x40x1 mmRgk. Pintu besi/konstruksi219,450.00/btg/6m229,900.00209,000.00Hollow 20x40x1 mmRgk. Pintu besi/konstruksi110,250.00/btg/6m115,500.00105,000.00Besi Hollow 40x40x1,2 (rangka utama)Rgk. Pintu besi/konstruksi225,750.00/btg/6m236,500.00215,000.00Besi Hollow 20x40x1,2 (rangka pembagi)Rgk. Pintu besi/konstruksi115,500.00/btg/6m121,000.00110,000.00Folding Gate :- Folding Gate, bahan besi plate tbl. 0.3 mmlengkap dg finishing & kunci dll.336,000.00/m2352,000.00320,000.00informasi arimata steel- Folding Gate, bahan besi plate tbl. 0.4 mmlengkap dg finishing & kunci dll.357,000.00/m2374,000.00340,000.00tgl 7 Mei 2013- Folding Gate, bahan besi plate tbl. 0.5 mmlengkap dg finishing & kunci dll.367,500.00/m2385,000.00350,000.00- Folding Gate, bahan galvalum, tbl. 0.3 mmlengkap dg finishing & kunci dll.372,750.00/m2390,500.00355,000.00- Folding Gate, bahan galvalum, tbl. 0.4 mmlengkap dg finishing & kunci dll.393,750.00/m2412,500.00375,000.00- Folding Gate, bahan galvalume, tbl. 0.5 mmlengkap dg finishing & kunci dll.414,750.00/m2434,500.00395,000.00Rolling Door :- Folding Gate, bahan besi plate tbl. 0.3 mmlengkap dg finishing & kunci dll.241,500.00/m2253,000.00230,000.00- Folding Gate, bahan Galvalum tbl. 0.3 mmlengkap dg finishing & kunci dll.294,000.00/m2308,000.00280,000.00- Folding Gate, bahan Allumunium tbl. 0.3 mmlengkap dg finishing & kunci dll.336,000.00/m2352,000.00320,000.00MATERIAL KAYUnaik 5%KAYU (+ 10%)Kayu Meranti basah- Balok Meranti basah (8/15,8/12,6/15,6/12, 5/10x400 cm)3,360,000.00/M33,520,000.003,200,000.00- Kasau Meranti basah (5/7x400, 4/6x400 cm)2,730,000.00/M32,860,000.002,600,000.00- Reng (3/4x400, 2/3x400)2,625,000.00/M32,750,000.002,500,000.00- Papan Meranti basah (3/30, 3/20 & 2/30x400 cm)4,200,000.00/M34,400,000.004,000,000.00Kayu Rimba Campuran (KRC) basah- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)2,415,000.00/M32,530,000.002,300,000.00- Kasau (5/7x400, 4/6x400 cm)1,995,000.00/M32,090,000.001,900,000.00- Reng (3/4x400, 2/3x400)1,890,000.00/M31,980,000.001,800,000.00- Papan (3/30, 3/20 & 2/30x400 cm)( u/. Bekisting )3,045,000.00/M33,190,000.002,900,000.00- Kayu Dolken (kayu Galam 8-10cm, L=4m)( u/. Bekisting )36,750.00/btg38,500.0035,000.00- Plastik cor( u/. Bekisting )6,300.00/M26,600.006,000.00Kayu Terentang- Papan uk. 3/30x400, 3/20x400 & 2/30x400 cm( u/. Bekisting )2,835,000.00/M32,970,000.002,700,000.00Kayu Kamper Samarinda basah- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)(u/. Rngk.Atap)7,350,000.00/M37,700,000.007,000,000.00- Kasau (5/7x400, 4/6x400 cm)(u/. Rngk.Atap)6,825,000.00/M37,150,000.006,500,000.00- Reng (3/4x400)(u/. Rngk.Atap)5,250,000.00/M35,500,000.005,000,000.00- Papan (3/20 & 2/30x400 cm)(u/. Rngk.Atap)8,505,000.00/M38,910,000.008,100,000.00Kayu Borneo/Meranti Super- Balok Borneo/Meranti Super, kelas-3(u/. Rngk.Atap)4,725,000.00/M34,950,000.004,500,000.00- Kasau Borneo/Meranti Super(u/. Rngk.Atap)4,462,500.00/M34,675,000.004,250,000.00Kayu Kruing- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)(u/. Rngk.Atap)5,040,000.00/M35,280,000.004,800,000.00- Kasau (5/7x400, 4/6x400 cm)(u/. Rngk.Atap)4,725,000.00/M34,950,000.004,500,000.00- Papan (3/20 & 2/30x400 cm)(u/. Rngk.Atap)6,825,000.00/M37,150,000.006,500,000.00Kayu Kamper Medan- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)(u/. Rngk.Atap)5,775,000.00/M36,050,000.005,500,000.00- Kasau (5/7x400, 4/6x400 cm)(u/. Rngk.Atap)5,512,500.00/M35,775,000.005,250,000.00- Papan (3/20 & 2/30x400 cm)(u/. Rngk.Atap)6,037,500.00/M36,325,000.005,750,000.00Kayu Bengkirai- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)(u/. Rngk.Atap)7,350,000.00/M37,700,000.007,000,000.00- Kasau (5/7x400, 4/6x400 cm)(u/. Rngk.Atap)7,140,000.00/M37,480,000.006,800,000.00- Papan (3/20 & 2/30x400 cm)(u/. Rngk.Atap)7,612,500.00/M37,975,000.007,250,000.00Kayu Kamper Singkil- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)(u/. Rngk.Atap)7,350,000.00/M37,700,000.007,000,000.00- Kasau (5/7x400, 4/6x400 cm)(u/. Rngk.Atap)7,140,000.00/M37,480,000.006,800,000.00Kayu Jati Kelas I (Jawa Timur)- Balok Jati Jawa Timur, Kelas-I(u/. Kosen/pintu)57,750,000.00/M360,500,000.0055,000,000.00- Papan Jati Jawa Timur, Kelas-I(u/. Kosen/pintu)60,375,000.00/M363,250,000.0057,500,000.00- Balok Jati Jawa Timur, Super(u/. Kosen/pintu)68,250,000.00/M371,500,000.0065,000,000.00- Papan Jati Jawa Timur, Super(u/. Kosen/pintu)70,875,000.00/M374,250,000.0067,500,000.00Kayu Jati Kelas II Basah (Jawa Tengah)- Balok uk. 6x15x100 - 190 cm38,850,000.00/M340,700,000.0037,000,000.00- Balok uk. 6x15x200 - 240 cm47,250,000.00/M349,500,000.0045,000,000.00- Balok uk. 6x15x240 - 290 cm52,500,000.00/M355,000,000.0050,000,000.00- Balok uk. 6x15x240 - 340 cm52,500,000.00/M355,000,000.0050,000,000.00- Balok uk. 6x15x340 - 390 cm63,000,000.00/M366,000,000.0060,000,000.00Kayu Kruing oven- Balok Kamper Kruing (oven)(u/. Kosen/pintu)6,300,000.00/M36,600,000.006,000,000.00- Balok Kamper Medan (oven)(u/. Kosen/pintu)6,300,000.00/M36,600,000.006,000,000.00Kayu Kamper Singkil oven- Balok Kamper Singkil (oven)(u/. Kosen/pintu)7,875,000.00/M38,250,000.007,500,000.00- Papan Kamper Singkil (oven)(u/. Kosen/pintu)8,137,500.00/M38,525,000.007,750,000.00Kayu Kamper Samarinda (kering oven)- Balok (8/12 x400 & 6/15x400 cm)(u/. Kosen)9,975,000.00/M310,450,000.009,500,000.00- Kasau (5/7x400, 4/6x400 cm)9,240,000.00/M39,680,000.008,800,000.00- Reng (3/4x400)7,140,000.00/M37,480,000.006,800,000.00- Papan (3/20x400 cm)10,395,000.00/M310,890,000.009,900,000.00- Papan (4/30, 4/25x400 cm)(u/. Pintu)10,395,000.00/M310,890,000.009,900,000.00- Balok Kamper Samarinda, super (oven)(u/. Kosen/pintu)10,500,000.00/M311,000,000.0010,000,000.00- Papan Kamper Samarinda, super (oven)(u/. Kosen/pintu)11,025,000.00/M311,550,000.0010,500,000.00- Papan Meranti oven(u/. Kosen/pintu)6,300,000.00/M36,600,000.006,000,000.00Kayu Bengkirai- Balok Bengkirai(u/. Kosen/pintu)7,875,000.00/M38,250,000.007,500,000.00- Papan Bengkirai(u/. Kosen/pintu)8,137,500.00/M38,525,000.007,750,000.00Kayu Merbau- Balok Merbau (oven)(u/. Kosen/pintu)10,500,000.00/M311,000,000.0010,000,000.00- Papan Merbau (oven)(u/. Kosen/pintu)10,762,500.00/M311,275,000.0010,250,000.00MATERIAL MULTIPLEKSnaik 5%Multipleks, 1220x2440x25 mm299,250.00/lmbr313,500.00285,000.00Multipleks, 1220x2440x22 mm278,250.00/lmbr291,500.00265,000.00Multipleks, 1220x2440x20 mm252,000.00/lmbr264,000.00240,000.00Multipleks, 1220x2440x18 mm207,900.00/lmbr217,800.00198,000.00Informasi bahan bangunanMultipleks, 1220x2440x15 mm187,950.00/lmbr196,900.00179,000.00tgl. 4 Mei 2013Multipleks, 1220x2440x12 mm156,450.00/lmbr163,900.00149,000.00Multipleks, 1220x2440x9 mm110,250.00/lmbr115,500.00105,000.00Multipleks, 1220x2440x6 mm80,850.00/lmbr84,700.0077,000.00Multipleks, 1220x2440x4 mm57,750.00/lmbr60,500.0055,000.00Teakwood 1220x2440x3 mm105,000.00/lmbr110,000.00100,000.00Plywood Sungkai, uk. 1220x2440x3 mm105,000.00/lmbr110,000.00100,000.00Plywood Sungkai, uk. 1220x2440x4 mm110,250.00/lmbr115,500.00105,000.00Plywood Sungkai, uk. 1220x2440x18 mm (1 muka)232,575.00/lmbr243,650.00221,500.00Plywood Sungkai, uk. 1220x2440x18 mm (2 muka)269,850.00/lmbr282,700.00257,000.00Bloktik, uk. 1220x2440x18 mm (1 muka)248,587.50/lmbr260,425.00236,750.00Melamin, uk. 1220x2440x3 mm (mengkilap)82,425.00/lmbr86,350.0078,500.00Formika, 92 x 212 mm89,250.00/lmbr93,500.0085,000.00HPL 4' x 8'183,750.00/lmbr192,500.00175,000.00MATERIAL GYPSUM, CALSIUM, GRCnaik 5%GYPSUM (+ 15%)Gypsum board 9 mm (water resistants)102,500.00/lmbr120,750.00105,000.00Gypsum board 9 mm59,000.00/lmbr69,000.0060,000.00Gypsum board 12 mm78,750.00/lmbr86,250.0075,000.00Calcium Silikat 6 mm106,365.00/lmbr116,495.00101,300.00Gypsum Tile 600x1200x9mm18,375.00/lmbr20,125.0017,500.00AcousticTile 600x1200x15 mmEx Armstrong37,800.00/lmbr41,400.0036,000.00Profil allumunium Main Tee (p. 3,6m)7,291.67/m'7,986.116,944.44Profil allumunium Cross Tee (p. 1,2 m)6,562.50/m'7,187.506,250.00Profil allumunium Cross Tee (p. 0,60 m)8,750.00/m'9,583.338,333.33Gypsum bubuk (compound)4,725.00/kg5,175.004,500.00Paku skrup gypsum42,000.00/Kg46,000.0040,000.00Textile tape18,375.00/roll20,125.0017,500.00List gypsum profil 5-10 cm5,250.00/m'5,750.005,000.00List plafond allumunium (Wall angle)6,825.00/m'7,475.006,500.00GRC BOARD, 1220x2440x5 mm73,500.00/lmbr80,500.0070,000.00GRC BOARD, 1220x2440x6 mm84,000.00/lmbr92,000.0080,000.00GRC BOARD, 1220x2440x8 mm115,500.00/lmbr126,500.00110,000.00GRC BOARD, 1220x2440x10 mm136,500.00/lmbr149,500.00130,000.00GRC SPR PANEL, 1220x2440x9 mm183,750.00/lmbr201,250.00175,000.00GRC SPR PANEL, 1220x2440x12 mm210,000.00/lmbr230,000.00200,000.00GRC SPR PANEL, 1220x2440x15 mm262,500.00/lmbr287,500.00250,000.00Compound GRC (A +B)60,375.00/kg66,125.0057,500.00Asbes plat 100x100x0,4 cm47,250.00/M251,750.0045,000.00Lem kayu42,000.00/Kg46,000.0040,000.00MATERIAL KACAnaik 5%KACA (+20%)Kaca polos tempered 12 mm, ex Asahi Masharga terpasang619,500.00/ M2708,000.00590,000.00Kaca warna tempered 12 mm, ex Asahi Masharga terpasang813,750.00/ M2930,000.00775,000.00Kaca polos tempered 12 mm (lubang dll), khusus pintuharga terpasang672,000.00/ M2768,000.00640,000.00Kaca warna tempered 12 mm (lubang dll), khusus pintuharga terpasang866,250.00/ M2990,000.00825,000.00Kaca tempered 10 mm, ex Asahi Masharga terpasang558,600.00/ M2638,400.00532,000.00Kaca polos 12 mm, ex Asahi Masharga terpasang446,250.00/ M2510,000.00425,000.00Kaca polos 10 mm, ex Asahi Masharga terpasang393,750.00/ M2450,000.00375,000.00Kaca polos 8 mm, ex Asahi Masharga terpasang236,250.00/ M2270,000.00225,000.00Kaca polos 8 mm tempered, ex Asahi Masharga terpasang404,250.00/ M2462,000.00385,000.00Kaca warna 8 mm, ex Asahi Masharga terpasang262,500.00/ M2300,000.00250,000.00Kaca warna 8 mm, ex Asahi Mas (Reflective)harga terpasang393,750.00/ M2450,000.00375,000.00Kaca polos 6 mm tempered, ex Asahi Masharga terpasang215,000.00/ M2270,000.00225,000.00Kaca polos 6 mm, ex Asahi Masharga terpasang168,000.00/ M2192,000.00160,000.00Kaca warna 6 mm, ex Asahi Masharga terpasang183,750.00/ M2210,000.00175,000.00Kaca polos 5 mm, ex Asahi Masharga terpasang147,000.00/ M2168,000.00140,000.00Kaca Stopsol Plat Laminated, polos tebal 6 mmharga terpasang420,000.00/ M2480,000.00400,000.00Kaca Stopsol Plat Laminated, polos tebal 8 mmharga terpasang708,750.00/ M2810,000.00675,000.00Kaca Stopsol Plat Laminated, polos tebal 10 mmharga terpasang1,076,250.00/ M21,230,000.001,025,000.00MATERIAL ALLUMUNIUMnaik 5%ALLUMUNIUM (+20%)ALLUMUNIUM PRODUK YKKProfil kosen Allumunium 1 3/4 x 3", Silver Clear Anodized ex YKK94,500.00/ M'108,000.0090,000.00Profil kosen Allumunium 1 3/4 x 4", Silver Clear Anodized ex YKK115,500.00/ M'132,000.00110,000.00Profil Frame Allumunium Pintu kaca, Silver Clear Anodized ex YKK105,000.00/ M'120,000.00100,000.00Profil Frame Allumunium Jendela kaca, Silver Clear Anodized ex YKK89,250.00/ M'102,000.0085,000.00Profil kosen Allumunium 1 3/4 x 3", Black/Brown Anodized ex YKK115,500.00/ M'132,000.00110,000.00Profil kosen Allumunium 1 3/4 x 4", Black/Brown Anodized ex YKK157,500.00/ M'180,000.00150,000.00Profil Frame Allumunium Pintu kaca, Black/Brown Anodized ex YKK147,000.00/ M'168,000.00140,000.00Profil Frame Allumunium Jendela kaca, Black/Brown Anodized ex YKK105,000.00/ M'120,000.00100,000.00Profil kosen Allumunium 1 3/4 x 3", Powder Coating ex YKK147,000.00/ M'168,000.00140,000.00Profil kosen Allumunium 1 3/4 x 4", Powder Coating ex YKK168,000.00/ M'192,000.00160,000.00Profil Frame Allumunium Pintu kaca, Powder Coating ex YKK161,700.00/ M'184,800.00154,000.00Profil Frame Allumunium Jendela kaca, Powder Coating ex YKK126,000.00/ M'144,000.00120,000.00ALLUMUNIUM PRODUK ALEXINDOProfil kosen Allumunium 1 3/4 x 3", Silver Clear Anodized ex Alexindo52,500.00/ M'60,000.0050,000.00Profil kosen Allumunium 1 3/4 x 4", Silver Clear Anodized ex Alexindo68,250.00/ M'78,000.0065,000.00Profil Frame Allumunium Pintu kaca, Silver Clear Anodized ex Alexindo63,000.00/ M'72,000.0060,000.00Profil Frame Allumunium Jendela kaca, Silver Clear Anodized ex Alexindo52,500.00/ M'60,000.0050,000.00Profil kosen Allumunium 1 3/4 x 3", Black/Brown Anodized ex Alexindo68,250.00/ M'78,000.0065,000.00Profil kosen Allumunium 1 3/4 x 4", Black/Brown Anodized ex Alexindo78,750.00/ M'90,000.0075,000.00Profil Frame Allumunium Pintu kaca, Black/Brown Anodized ex Alexindo73,500.00/ M'84,000.0070,000.00Profil Frame Allumunium Jendela kaca, Black/Brown Anodized ex alexindo63,000.00/ M'72,000.0060,000.00Profil kosen Allumunium 1 3/4 x 3", Powder Coating serat kayu, ex Alexindo136,500.00/ M'156,000.00130,000.00Profil kosen Allumunium 1 3/4 x 4", Powder Coating serat kayu, ex Alexindo168,000.00/ M'192,000.00160,000.00Profil Frame Allumunium Pintu kaca, Powder Coating serat kayu, ex Alexindo157,500.00/ M'180,000.00150,000.00Profil Frame Allumunium Jendela kaca, Powder Coating serat kayu, ex Alexindo126,000.00/ M'144,000.00120,000.00Sealant kaca8,531.25/ M'10,156.258,125.00Karet kaca2,887.50/ M'3,437.502,750.00Allumunium plat tebal 0,4 mm, uk. 1000x2000 mm129,675.00/lmbr154,375.00123,500.00Allumunium plat tebal 0,4 mm, uk. 1220x2440 mm192,675.00/lmbr229,375.00183,500.00Allumunium plat tebal 0,5 mm, uk. 1000x2000 mm162,225.00/lmbr193,125.00154,500.00Allumunium plat tebal 0,5 mm, uk. 1220x2440 mm240,975.00/lmbr286,875.00229,500.00Allumunium Bordes tebal 2 mm, uk. 1000x2000 mm752,325.00/lmbr895,625.00716,500.00Allumunium Bordes tebal 3 mm, uk. 1000x2000 mm1,128,225.00/lmbr1,343,125.001,074,500.00MATERIAL ATAPnaik 5%BAHAN ATAP (+ 20%)Genteng Plentong Glazur, ex Jatiwangi4,462.50/bh5,100.004,250.00Nok Genteng Plentong Glazur, ex Jatiwangi7,875.00/bh9,000.007,500.00Genteng Plentong tidak Glazur, ex Jatiwangi3,675.00/bh4,200.003,500.00Nok Genteng Plentong tidak Glazur, ex Jatiwangi6,300.00/bh7,200.006,000.00Genteng Keramik Glazur ex KanmuriStandar Espanica Natural12,285.00/bh14,040.0011,700.00Genteng Keramik Glazur ex KanmuriStandar Espanica Medium13,125.00/bh15,000.0012,500.00Genteng Keramik Glazur ex KIAStadar Natural13,125.00/bh15,000.0012,500.00Nok Genteng Keramik Glazur, ex KIAStadar Natural26,565.00/bh30,360.0025,300.00Genteng Keramik ex Cisangkan type Victoria12,600.00/bh14,400.0012,000.00Nok Genteng Keramik, ex Cisangkan26,250.00/bh30,000.0025,000.00Genteng Morando Glazur, ex Jatiwangi3,675.00/bh4,200.003,500.00Genteng Morando tidak Glazur, ex Jatiwangi4,200.00/bh4,800.004,000.00Nok Genteng Morando tidak Glazur, ex Jatiwangi10,500.00/bh12,000.0010,000.00Genteng Beton ex Karangpilang (berwarna)12,600.00/bh14,400.0012,000.00Genteng Nok Beton Karangpilang (berwarna)26,250.00/bh30,000.0025,000.00Djabes gelombang kecil (B100) uk. 300x105, tbl. 6mm141,750.00/Lbr162,000.00135,000.00Djabes gelombang kecil (B100) uk. 300x105, tbl. 5mm126,000.00/Lbr144,000.00120,000.00Djabes gelombang kecil (K200) uk. 300x105, tbl. 4mm94,500.00/Lbr108,000.0090,000.00Skrup + ring472.50/bh540.00450.00Atap Sirap236,250.00/M2270,000.00225,000.00Paku sirap31,500.00/Kg36,000.0030,000.00Atap Gelombang GALVALUME, type SPANDEK LYSAGHT, tebal 0,75 mm(ex. CV. Cipta Prima Sentosa)177,975.00/M2203,400.00169,500.00Atap Gelombang GALVALUME, type SPANDEK LYSAGHT, tebal 0,50 mm(ex. CV. Cipta Prima Sentosa)91,875.00/M2105,000.0087,500.00Atap Metal ZINCALUM, type ada sterofoam 5cm210,000.00/M2240,000.00200,000.00Atap Metal Spandex Zincalum tebal 0,5 mm(ex. CV. Cipta Prima Sentosa)121,800.00/M2139,200.00116,000.00MATERIAL WATERPROOFINGLapisan Coating PF Primerwaterproofing atap beton18,375.00/M221,000.0017,500.00Waterproofing Membrane, Sopralene 4 mmwaterproofing atap beton157,500.00/M2180,000.00150,000.00Waterproofing Membrane, Gardigum 4 mmwaterproofing atap beton141,750.00/M2162,000.00135,000.00Waterproofing jenis coating ex Sika/AM/setara52,500.00/Kg60,000.0050,000.00MATERIAL KERAMIK, MARMER, GRANIT & HOMOGENOUS TILEKERAMIK (+ 10%)Granit Import- Granit Import (Red China & Black China) jenis Slab577,500.00/M2605,000.00550,000.00- Granit Import (Nero Absolute India) jenis slab1,023,750.00/M21,072,500.00975,000.00Homogenous Tile Niro Granite- Niro Granite 80x80 Cm257,250.00/M2269,500.00245,000.00- Niro Granite 60x60 Cm231,000.00/M2242,000.00220,000.00- Niro Granite 60x60 Cm (un-polish)210,000.00/M2220,000.00200,000.00- Niro Granite 40x40 Cm168,000.00/M2176,000.00160,000.00Homogenous Tile Granito- Granito Salsa 60x60 Cm (polished)W : Pearl White, Ivory255,255.00/M2267,410.00243,100.00- Granito Salsa 60x60 Cm (polished)W : Water stone, White stone313,005.00/M2327,910.00298,100.00- Granito group Diamon 60x60 Cm (polished)W : Water stone, White stone272,580.00/M2285,560.00259,600.00- Granito Palazzo 60x60 Cm (polished)W : Sanrosa331,485.00/M2347,270.00315,700.00- Granito Aurora group Silver 60x60 Cm (polished)W : Slamon type miror301,455.00/M2315,810.00287,100.00- Granito Aurora Group Gold 60x60 Cm (polished)W : Astro371,910.00/M2389,620.00354,200.00- Granito Lunar group Silver 60x60 Cm (un-polished)W : Terra, Zephyr type Rustic259,875.00/M2272,250.00247,500.00- Granito Lunar group Gold 60x60 Cm (un-polished)W : Amber, Quartz type Rustic307,461.00/M2322,102.00292,820.00- Granito Lunar group Bronze 60x60 Cm (un-polished)W : Solar, Helium type Rustic248,325.00/M2260,150.00236,500.00- Granito Lunar 60x60 Cm (un-polished)W : Alumina, Oxide358,050.00/M2375,100.00341,000.00- Granitto Aurora 30x60 Cm (polished), Group SilverW : Waffel, Latte type miror310,695.00/M2325,490.00295,900.00- Granitto Lunar 30x60 Cm (Un-polished), Group BronzeW : Solar, Helium type Rustic257,565.00/M2269,830.00245,300.00- Granitto Lunar 30x60 Cm (Un-polished), Group SilverW : Terra, Zephyr type Rustic269,115.00/M2281,930.00256,300.00- Granitto Lunar 30x60 Cm (Un-polished), Group GoldW : Amber, Quartz type Rustic307,461.00/M2322,102.00292,820.00- Granitto 40/40 Cm (polish) Group Silver, type CrystalW : Pearl White, Ivory, Mustand170,940.00/M2179,080.00162,800.00- Granitto 40/40 Cm (polish) Group SilverW : Greystone, Line197,505.00/M2206,910.00188,100.00- Granitto 40/40 Cm (polish) Group Gold, type CrystaW : Black225,750.00/M2236,500.00215,000.00- Granitto 40/40 Cm (Un-polish) Group Gold, type OasisW : Forest Green, Brick, Cocoa, Black192,885.00/M2202,070.00183,700.00- Granitto Gastello 30x30 Cm (Un-polish) Group Silver, type rusticW : Capucino, expreso, crme157,080.00/M2164,560.00149,600.00- Homogenous Tile 60x60 Cm, ex China136,500.00/M2143,000.00130,000.00Homogenous Tile Inesa- Inesa, 30/30,40/40, Onix (Un-Polished)102,375.00/M2107,250.0097,500.00- Group A (Pearl, Opal, Agate, Cateye, Topaz, Zamrud)Inesa, uk. 30/30 & 40/40 (Polished)144,900.00/M2151,800.00138,000.00- Group A (Pearl, Opal, Agate, Cateye, Topaz, Zamrud)Inesa, 30/30,40/40 UP (Onix, Phyrus, Ruby, Jade)Group C132,300.00/M2138,600.00126,000.00- Inesa, 30/30, 40/40 P (Onix, Phyrus, Ruby, Jade)Group C146,265.00/M2153,230.00139,300.00- Inesa, 40/40 Group A (Corypha polish)169,575.00/M2177,650.00161,500.00- Inesa, 60 x 60 Group A (Corypha polish)214,987.50/M2225,225.00204,750.00- Inesa, 40x40 (Polish), warna Topaz159,075.00/M2166,650.00151,500.00- Inesa, 60/60 (P), Raphia214,987.50/M2225,225.00204,750.00Homogenous Tile Essenza- Essenza 30/30, Papper Grey (Un-Polished)157,500.00/M2165,000.00150,000.00- Essenza 30/30, Papper Grey (Polished)183,750.00/M2192,500.00175,000.00- Essenza Group A 40x40, Papper Grey (Un-Polished)173,712.00/M2181,984.00165,440.00- Essenza Group A 40x40 polishwarna : prince rubber, silver star198,660.00/M2208,120.00189,200.00- Essenza 60x60, Blak Orchid (Polished)288,750.00/M2302,500.00275,000.00- Essenza Group B 60x60 (Polished)warna : Corypha300,646.50/M2314,963.00286,330.00- Essenza Group A 60x60 polishwarna : prince rubber, silver star243,936.00/M2255,552.00232,320.00Homogenous Tile Uero Grace- Uero Grace 60/60, FHQ 6207 (pgnt Raphia)178,500.00/M2187,000.00170,000.00- Uero Grace 30/30, FHQ 6207131,250.00/M2137,500.00125,000.00- Uero Grace 60/60, Golden Black (pgnt Onix)236,250.00/M2247,500.00225,000.00Marmer- Marmer Import Crema EvoryJenis slab682,500.00/M2715,000.00650,000.00- Marmer Import Golden PerlantoJenis slab682,500.00/M2715,000.00650,000.00- Marmer Import VolacasJenis slab997,500.00/M21,045,000.00950,000.00- Marmer Import TravertineJenis slab1,365,000.00/M21,430,000.001,300,000.00- Marmer Import Rossi VietnamJenis slab630,000.00/M2660,000.00600,000.00- Marmer Tulung Agung, 60/60 cm420,000.00/M2440,000.00400,000.00- Marmer Tulung AgungJenis slab498,750.00/M2522,500.00475,000.00- Marmer Ujung Pandang (acid wash), 600x600 mmJenis slab609,000.00/M2638,000.00580,000.00- Marmer ex Citatah, 30/30170,625.00/M2178,750.00162,500.00- Marmer ex Citatah, 60/60275,625.00/M2288,750.00262,500.00- Teralux Marmer 60x60 cm367,500.00/M2385,000.00350,000.00Floor Hardener- Floor Hardener (Gan's Floor)9,450.00/kg9,900.009,000.00- Epoxy Resin12,600.00/kg13,200.0012,000.00Keramik Tile- Porselen 11 x 11 cm57,750.00/M260,500.0055,000.00- Keramik Artistik 5x20 Cm68,250.00/M271,500.0065,000.00- Keramik lokal 10x20 Cm (ex Roman)57,750.00/M260,500.0055,000.00- Keramik lokal 20/20 Cm (ex Roman) Gol A86,100.00/M290,200.0082,000.00- Keramik lokal 20/25 Cm (ex Roman) Gol A79,800.00/M283,600.0076,000.00- Keramik lokal 30x30 Cm (ex Roman) Gol B73,500.00/M277,000.0070,000.00- Keramik lokal 33,3x33,3 Cm (ex Roman) Gol A97,650.00/M2102,300.0093,000.00- Keramik lokal 30x60 Cm (ex Roman) Gol AWall tile134,925.00/M2141,350.00128,500.00- Keramik lokal 20x40 Cm (ex Roman) Gol A84,000.00/M288,000.0080,000.00- Keramik lokal 40/40 Cm (ex Roman) Gol A82,500.00/M2101,200.0092,000.00- Keramik Homogenous 30/30 Cm (ex Roman Gress)Gol. D96,600.00/M2101,200.0092,000.00- Keramik Homogenous 60/60 Cm (ex Roman Gress)Gol. B176,400.00/M2184,800.00168,000.00MATERIAL LANTAI PARQUETPARQUET (+ 10%)- Red Oak lam parquet uk. 1,5 x 6 x 30 cm121,380.00/M2127,160.00115,600.00- Red Oak lam parquet uk. 1 x 5 x 30 cm110,775.00/M2116,050.00105,500.00- Jati lem parquet uk. 1 x 5 x 30 cm145,923.75/M2152,872.50138,975.00- Jati lem parquet uk. 1 x 7 x 35 cm156,187.50/M2163,625.00148,750.00- Jati lem parquet uk. 1 x 5 x 25 cm103,635.00/M2108,570.0098,700.00- Tg. Parquet Jati uk. 1,8 x 5 x 30 cm107,730.00/M2112,860.00102,600.00- Graculad174,510.00/M2182,820.00166,200.00- Gracewood 144188,685.00/M2197,670.00179,700.00- Parkit (Kronospan) uk. 19 x 120 cm189,000.00/M2198,000.00180,000.00- Parkit (Dream Wood) uk. 19 x 120 cm189,000.00/M2198,000.00180,000.00- Underlayer / Rubber corrugatedDasaran lantai karpet31,500.00/M230,000.00- Karpet Sheet ex LokalKualitas baik52,500.00/M250,000.00- Carpet Tile 50x50, ex Leiko236,250.00/M2225,000.00- Vinyl tile 30x30 cm, ex ..157,500.00/M2150,000.00- Parket sintetis uk. 10 x 90 cm78,750.00/M282,500.0075,000.00MATERIAL BATU ALAMBATU ALAM (+ 15%)- Batu Candi 20x40 cm133,000.35/M2145,667.05126,667.00- Batu alur Candi 20x40 cm156,187.50/M2171,062.50148,750.00- Batu Alam susun hitam 3x30 cm157,500.00/M2172,500.00150,000.00- Batu alam Paliaman 20X40147,000.00/M2161,000.00140,000.00- Batu acak Sukabumi110,250.00/M2120,750.00105,000.00- Batu acak Garut110,250.00/M2120,750.00105,000.00- Batu acak Purwakarta110,250.00/M2120,750.00105,000.00- Batu alam Purwakarta136,500.00/M2149,500.00130,000.00- Batu alam Andesit 20/20 & 15/30 cm168,000.00/M2184,000.00160,000.00- Batu alam Andesit 20/30 cm178,500.00/M2195,500.00170,000.00- Batu alam Andesit 20/40 s/d 30/40 cm189,000.00/M2207,000.00180,000.00- Paras Jogja 20/30s/d40/40 (cream/putih)99,750.00/M2109,250.0095,000.00- Paras Jogja 20/40s/d40/60 (cream/putih)115,500.00/M2126,500.00110,000.00MATERIAL CONBLOCK / INTERBLOCK (Ex. INTERNUSA)CONBLOCK (+ 15%)Interblock 16.6, warna abu-abu99,750.00/M2109,250.0095,000.00Interblock 16.6, warna Mrh, Htm, Kng, Klasik131,250.00/M2143,750.00125,000.00Interblock 16.6, warna Hijau141,750.00/M2155,250.00135,000.00Interblock 16.8, warna abu-abu136,500.00/M2149,500.00130,000.00Interblock 16.8, warna Mrh, Htm, Kng, Klasik147,000.00/M2161,000.00140,000.00Interblock 16.8, warna Hijau157,500.00/M2172,500.00150,000.00Zurich 12.6 / Tiga berlian 6, abu-abu124,110.00/M2135,930.00118,200.00Zurich 12.6 / Tiga berlian 6, (Mrh, Htm, Kng, Klasik)143,010.00/M2156,630.00136,200.00Zurich 12.6 / Tiga berlian 6, Hijau157,500.00/M2172,500.00150,000.00Zurich 12.8 / Tiga berlian 8, abu-abu144,900.00/M2158,700.00138,000.00Zurich 12.8 / Tiga berlian 8, (Mrh, Htm, Kng, Klasik)163,800.00/M2179,400.00156,000.00Zurich 12.8 / Tiga berlian 8, Hijau181,440.00/M2198,720.00172,800.00Grassblock 20.10.40 (abu-abu)143,010.00/M2156,630.00136,200.00Grassblock 20.8.40 (abu-abu)117,810.00/M2129,030.00112,200.00Kansteen 15 x 30 x 4039,900.00/Bh43,700.0038,000.00MATERIAL BUIS BETONBuis beton dia. 20 cm tanpa tulang, panjang 1 m63,525.00/Bh60,500.00Buis beton dia. 30 cm tanpa tulang, panjang 1 m88,935.00/Bh84,700.00Buis beton 1/2 dia. 20 cm tanpa tulang, panjang 0,50 m38,115.00/Bh36,300.00Buis beton 1/2 dia. 30 cm tanpa tulang, panjang 0,50 m53,130.00/Bh50,600.00MATERIAL CATCAT (+ 20%)Cat Duco Danagloss88,725.00/Kg101,400.0084,500.00Cat Duco Nippe 200049,875.00/Kg57,000.0047,500.00Dempul Duco Sanpolac36,750.00/Kg42,000.0035,000.00Tinner Up28,875.00/Kg33,000.0027,500.00Cat Tembok Catylac (Acrilyc Emulsion), putih26,250.00/Kg30,000.0025,000.00Cat Tembok Dulux ICI (Acrilyc Emulsion)Dulux Pentalite warna standart44,257.50/Kg50,580.0042,150.0042,142.86Cat Tembok Dulux ICI (Acrilyc Emulsion)Dulux Pentalite warna khusus51,292.50/Kg58,620.0048,850.0048,857.14Cat Tembok Dulux ICI (Acrilyc Emulsion), warna tua47,250.00/Kg54,000.0045,000.00Cat Tembok luar (ICI Dulux Weathershield)Warna standart60,375.00/Kg69,000.0057,500.0068,571.43Cat Tembok luar (ICI Dulux Weathershield)Warna khusus80,398.50/Kg91,884.0076,570.0076,571.43Cat Tembok luar (ICI Dulux Weathershield), warna tua86,992.50/Kg99,420.0082,850.0082,857.14Alkali Resistants Dulux ICI45,596.25/Kg52,110.0043,425.0043,428.57Cat Tembok Mowilex (Acrilyc Emulsion)39,375.00/Kg45,000.0037,500.00Cat Tembok Mowilex (Wather Coat)57,750.00/Kg66,000.0055,000.00Cat Tembok (cat minyak) ex Mowilex60,000.00/KgCat Tembok Vinilex Super20,000.00/Kg24,000.0020,000.00Plamur Tembok Matex (5 kg)18,375.00/Kg21,000.0017,500.00Cat Kayu/besi (ICI Dulux Super Gloss)57,750.00/Kg66,000.0055,000.00Cat Kayu/besi (ex Danapaint, Gloss)52,500.00/Kg60,000.0050,000.00Cat Kayu / besi (kwalitas sedang, Ftalit, Kuda Terbang)47,250.00/Kg54,000.0045,000.00Plamur kayu26,250.00/Kg30,000.0025,000.00Pelitur52,500.00/Kg60,000.0050,000.00Melamik Ultran63,000.00/Kg72,000.0060,000.00Cat warna Ultran52,500.00/Kg60,000.0050,000.00Sanding Ultran55,125.00/Kg63,000.0052,500.00Filler Ultran52,500.00/Kg60,000.0050,000.00Menie Kayu23,625.00/Kg27,000.0022,500.00Residu18,375.00/Kg21,000.0017,500.00Kuas Roll36,750.00/Bh42,000.0035,000.00Kuas15,750.00/Bh18,000.0015,000.00Ampelas2,887.50/Bh3,300.002,750.00DAFTAR UPAH TENAGA KERJAJakarta, Juni 2013PANGKAL PINANGJKT, Jurnal 2013DAFTAR PEKERJABIDANG PEKERJAANUPAHUpah/hariUpah/hariMandorBerlaku untuk keseluruhan110,000.00/org/hari155,000.00143,221.00Kepala Tukang Kayu105,000.00/org/hari125,000.00126,598.00Tukang Kayu (konstruksi)Pek. Rangka atap90,000.00/org/hari98,000.00109,960.00Tukang Kayu halusPek. Kosen, pintu & jendela95,000.00/org/hari105,000.00115,000.00Tukang Kayu MebelPek. Furniture100,000.00/org/hari110,000.00120,000.00Kepala Tukang Batu100,000.00/org/hari125,000.00126,598.00Tukang batuPek. Pasangan batu/bata90,000.00/org/hari99,000.00109,960.00Tukang batu halusPek. Finishing95,000.00/org/hari105,000.00115,000.00Kepala Tukang Gypsum95,000.00/org/hari125,000.00126,598.00Tukang GypsumPek. Plafond / Partisi90,000.00/org/hari99,000.00109,960.00Kepala Tukang BesiPembesian konstrusi beton90,000.00/org/hari125,000.00126,598.00Tukang besi85,000.00/org/hari99,000.00109,960.00Tukang Las konstruksi100,000.00/org/hari150,000.00109,960.00Kepala Tukang Gali90,000.00/org/hari125,000.00126,598.00Tukang GaliPek. Galian tanah109,960.00/org/hari99,000.00109,960.00Kepala Tukang Cat90,000.00/org/hari125,000.00126,598.00Tukang CatFinishing pengecatan100,000.00/org/hari99,000.00109,960.00Tukang Pelitur/melamik100,000.00/org/hari99,000.00115,000.00Kepala Tukang Allumunium90,000.00/org/hari125,000.00126,598.00Tukang khusus allumunium100,000.00/org/hari105,000.00109,960.00Kepala Tukang pipa90,000.00/org/hari125,000.00126,598.00Tukang pipa109,960.00/org/hari99,000.00109,960.00P e k e r j aBerlaku untuk keseluruhan75,000.00/org/hari85,000.0093,351.00

&CRAB - 0&P

AnalisaANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNINO.URAIAN PEKERJAANSNIANALISA HARGA BAHAN & UPAHHARGA SATUANkfsnsathrg. sat.Total hargaPEKERJAANI.PEK. PERSIAPAN & TAPAK1.1.PEK. BOWPLANK / M'BOWBahan :Kayu Meranti Palembang papan0.007M34,200,000.0027,720.00Kayu Meranti Palembang kaso0.010M32,730,000.0026,276.25Paku biasa 2"-5"0.020Kg15,356.25307.13Sub - Bahan54,303.38Rp54,303.38Upah :Kep. Tukang Kayu0.010Org105,000.001,050.00Tukang Kayu0.100Org90,000.009,000.00Pekerja0.100Org75,000.007,500.00Mandor0.005Org110,000.00550.00Sub - Upah18,100.00Rp18,100.00TOTALRp72,403.381.2.PAGAR SEMENTARA dari Seng Gelombang tg. 2 m / M'Bahan :Semen PC2.500zak1,300.003,250.00Pasir beton0.005M3270,375.001,351.88Batu pecah/split 2/30.009M3269,500.352,425.50Seng gelombang 3x6 ft BJLS 20 (0,2 mm)1.200lbr47,250.0056,700.00Kayu dolken 8-10/400 cm1.250btg36,750.0045,937.50Kayu Meranti Palembang kaso0.014M32,730,000.0038,220.00Paku biasa 2"-5"0.060Kg15,356.25921.38Cat meni besi0.450Kg23,625.0010,631.25Sub - Bahan159,437.50Rp159,437.50Upah :Kep. Tukang Kayu0.020Org105,000.002,100.00Tukang Kayu0.200Org90,000.0018,000.00Pekerja0.400Org75,000.0030,000.00Mandor0.020Org110,000.002,200.00Sub - Upah52,300.00Rp52,300.00TOTALRp211,737.501.3.PEMB. JALAN SEMENTARA, tebal 20 cm / M2Bahan :Batu belah 15/200.150M3257,250.0038,587.50Batu pecah 5/70.090M3262,500.0023,625.00Pasir pasang0.010M3265,125.002,651.25Sub - Bahan64,863.75Rp64,863.75Upah :Pekerja1.000Org75,000.0075,000.00Mandor0.050Org110,000.005,500.00Sub - Upah80,500.00Rp80,500.00TOTALRp145,363.751.4.PEMB. KANTOR SEMENTARA, lantai plesteran, atap Seng / M2Bahan :Kayu dolken 8-10/400 cm1.250btg36,750.0045,937.50Kayu Meranti Palembang kaso0.018m2,730,000.0049,140.00Paku biasa 2"-5"0.850kg15,356.2513,052.81Besi pelat strip1.100kg14,542.5015,996.75Semen portland35.000kg1,300.0045,500.00Pasir pasang0.150m265,125.0039,768.75Pasir beton0.100m270,375.0027,037.50Batu pecah/split 2/30.150m269,500.3540,425.05Bata merah30.000bh630.0018,900.00Seng gelombang 3x6 ft BJLS 20 (0,2 mm)0.250Lbr47,250.0011,812.50Jendela nako (rangka)7.000daun15,000.00105,000.00Kaca 3 mm0.080m75,000.006,000.00Kunci tanam sederhana0.150bh60,000.009,000.00Teakwood 4x8 ft 3 mm0.060lbr105,000.006,300.00Sub - Bahan433,870.87Rp433,870.87Upah :Kep. Tukang Kayu0.300Org105,000.0031,500.00Tukang Kayu2.000Org90,000.00180,000.00Tukang Batu1.000Org90,000.0090,000.00Pekerja1.000Org75,000.0075,000.00Mandor0.050Org110,000.005,500.00Sub - Upah382,000.00Rp382,000.00TOTALRp815,870.871.5.GUDANG SEMEN & PERALATAN, lantai plesteran, atap Seng / M2Bahan :Kayu dolken 8-10/400 cm1.700btg36,750.0062,475.00Kayu Meranti Palembang kaso0.021m2,730,000.0057,330.00Paku biasa 2"-5"0.300kg15,356.254,606.88Semen portland10.500kg1,300.0013,650.00Pasir beton0.030m270,375.008,111.25Batu pecah/split 2/30.050m269,500.3513,475.02Seng gelombang 3x6 ft BJLS 20 (0,2 mm)1.500Lbr47,250.0070,875.00Sub - Bahan230,523.14Rp230,523.14Upah :Kep. Tukang Kayu0.200Org105,000.0021,000.00Tukang Kayu2.000Org90,000.00180,000.00Pekerja1.000Org75,000.0075,000.00Mandor0.050Org110,000.005,500.00Sub - Upah281,500.00Rp281,500.00TOTALRp512,023.141.6.PAGAR PERIMETER, dari kawat duri tinggi 70 cm / M'Bahan :Besi siku6.750kg14,455.3597,573.61Semen portland2.000kg1,300.002,600.00Pasir beton0.005m270,375.001,351.88Batu pecah/split 2/30.009m269,500.352,425.50Paku biasa 2"-5"0.060kg15,356.25921.38Kawat duri (10kg/60m/rol)0.050kg16,537.50826.88Sub - Bahan105,699.24Rp105,699.24Upah :Kep. Tukang Kayu0.020Org105,000.002,100.00Tukang Kayu0.200Org90,000.0018,000.00Pekerja0.300Org75,000.0022,500.00Mandor0.020Org110,000.002,200.00Sub - Upah44,800.00Rp44,800.00TOTALRp150,499.241.7.PEK. TANAH DILAKSANAKAN SECARA KONVENSIONAL1PEMBERSIHAN LAPANGAN dan PERATAAN / M2Upah :Pekerja0.100Org75,000.007,500.00Mandor0.050Org110,000.005,500.00Sub - Upah13,000.00Rp13,000.002PENGUPASAN LAPISAN ATAS / M2Upah :Pekerja0.250Org75,000.0018,750.00Mandor0.012Org110,000.001,320.00Sub - Upah20,070.00Rp20,070.003GALIAN TANAH BIASA, sedalam 1 m / M3SNIUpah :Pekerja0.750Org75,000.0056,250.00Mandor0.025Org110,000.002,750.00Sub - Upah59,000.00Rp59,000.004GALIAN TANAH BIASA, sedalam 2 m / M3SNIUpah :Pekerja0.900Org75,000.0067,500.00Mandor0.045Org110,000.004,950.00Sub - Upah72,450.00Rp72,450.005GALIAN TANAH BIASA, sedalam 3 m / M3SNIUpah :Pekerja1.050Org75,000.0078,750.00Mandor0.067Org110,000.007,370.00Sub - Upah86,120.00Rp86,120.006GALIAN TANAH KERAS, sedalam 1 m / M3SNIUpah :Pekerja1.000Org75,000.0075,000.00Mandor0.032Org110,000.003,520.00Sub - Upah78,520.00Rp78,520.007GALIAN TANAH CADAS, sedalam 1 m / M3SNIUpah :Pekerja1.500Org75,000.00112,500.00Mandor0.060Org110,000.006,600.00Sub - Upah119,100.00Rp119,100.008GALIAN TANAH LUMPUR, sedalam 1 m / M3SNIUpah :Pekerja1.200Org75,000.0090,000.00Mandor0.045Org110,000.004,950.00Sub - Upah94,950.00Rp94,950.009STRPPING TEBING, setinggi 1 m / M2SNIUpah :Pekerja0.050Org75,000.003,750.00Mandor0.005Org110,000.00550.00Sub - Upah4,300.00Rp4,300.0010MEMBUANG TANAH, sejauh 150 m / M3SNIUpah :Pekerja0.516Org75,000.0038,700.00Mandor0.050Org110,000.005,500.00Sub - Upah44,200.00Rp44,200.0011URUGAN TANAH KEMBALI / M3SNIUpah :Pekerja0.250Org75,000.0018,750.00Mandor0.008Org110,000.00880.00Sub - Upah19,630.00Rp19,630.0012PERATAAN & PEMADATAN URUGAN TANAHUpah :meratakan & memadatkanPekerja0.500Org75,000.0037,500.00Mandor0.050Org110,000.005,500.00Sub - Upah43,000.00Rp43,000.0013URUGAN TANAH DARI LUAR / M3BOWBahan :Tanah Urug1.200M3262,500.00315,000.00Angkutan Truk1.200M325,000.0030,000.00Sub - Bahan345,000.00Rp345,000.00Upah :menimbun, meratakan & memadatkanPekerja0.200Org75,000.0015,000.00Mandor0.010Org110,000.001,100.00Sub - Upah16,100.00Rp16,100.00TOTALRp361,100.0014PEK. GALIAN TANAH (CUT) dengan Alat Berat / M3SNIUpah :Pekerja0.109Org75,000.008,175.00Mandor0.054Org110,000.005,940.00Sub - Upah14,115.00Rp14,115.00Harga pemakaian alat berat-EXCAVATOR 150 HP Kobelco SK2000.054jam469,389.8025,347.05-DUMP TRUCK 3-4 M3 / 6 ton0.100jam242,640.2024,264.02-Alat bantu1.000ls10,000.0010,000.00Sub - Sewa Peralatan59,611.07Rp59,611.07TOTALRp73,726.0715PEK URUGAN TANAH (FILL) dengan Alat Berat / M3SNIBahan :Tanah Urug1.200M3262,500.00315,000.00Sub - Bahan315,000.00Rp315,000.00Upah :Pekerja0.250Org75,000.0018,750.00Mandor0.025Org110,000.002,750.00Sub - Upah21,500.00Rp21,500.00Harga pemakaian alat berat-WHEEL LOADER 1-1,6 m30.020jam267,270.305,345.41-DUMP TRUCK 3-4 M3 / 6 ton0.331jam242,640.2080,313.91-MOTOR GRADER 100 HP0.007jam288,512.402,019.59-VIBRATOR ROLLER 5-8 Ton0.011jam247,328.402,720.61-WATER TANK TRUCK0.008jam145,530.001,164.24-Alat bantu1.000ls10,000.0010,000.00Sub - Sewa Peralatan101,563.75Rp101,563.75TOTALRp438,063.751.8.PEK. URUGAN PASIR URUG / M3SNI-2008Bahan :Pasir Urug1.200M3291,375.00349,650.00Sub - Bahan349,650.00Rp349,650.00Upah :Pekerja0.300Org75,000.0022,500.00Mandor0.010Org110,000.001,100.00Sub - Upah23,600.00Rp23,600.00TOTALRp373,250.001.9.PEK. URUGAN SIRTU / M3SNI-2008Bahan :Sirtu1.200M3256,200.00307,440.00Sub - Bahan307,440.00Rp307,440.00Upah :Pekerja0.250Org75,000.0018,750.00Mandor0.025Org110,000.002,750.00Sub - Upah21,500.00Rp21,500.00TOTALRp328,940.001.10.PEK. URUGAN PASIR EXTRA BETON / M3SNI-2008Bahan :Pasir Extra beton1.200M3273,000.00327,600.00Sub - Bahan327,600.00Rp327,600.00Upah :Pekerja0.250Org75,000.0018,750.00Mandor0.025Org110,000.002,750.00Sub - Upah21,500.00Rp21,500.00TOTALRp349,100.001.11.PEK. URUGAN PENETRASI /SPLIT 2-3 cm / M3SNI-2008Bahan :Batu split 2-3 cm1.200M3269,500.35323,400.42Sub - Bahan323,400.42Rp323,400.42Upah :Pekerja0.250Org75,000.0018,750.00Mandor0.025Org110,000.002,750.00Sub - Upah21,500.00Rp21,500.00TOTALRp344,900.421.12.PEK. LAPISAN MAKADAM BATU BELAH / M3SNI-2008Bahan :Makadam/batu pecah 5-7 cm1.200M3257,250.00308,700.00Sub - Bahan308,700.00Rp308,700.00Upah :Pekerja0.250Org75,000.0018,750.00Mandor0.025Org110,000.002,750.00Sub - Upah21,500.00Rp21,500.00TOTALRp330,200.001.13.PEK. LAPISAN MAKADAM BATU PECAH 5-7 cm / M3SNI-2008Bahan :Makadam/batu pecah 5-7 cm1.200M3262,500.00315,000.00Sub - Bahan315,000.00Rp315,000.00Upah :Pekerja0.250Org75,000.0018,750.00Mandor0.025Org110,000.002,750.00Sub - Upah21,500.00Rp21,500.00TOTALRp336,500.001.14.PEK. LAPISAN IJUK TEBAL 10 CM (u/. Dinding resapan)SNI-2008Bahan :I j u k6.000kg31,500.00189,000.00Sub - Bahan189,000.00Rp189,000.00Upah :Pekerja0.150Org75,000.0011,250.00Mandor0.015Org110,000.001,650.00Sub - Upah12,900.00Rp12,900.00TOTALRp201,900.001.15.PEKERJAAN BONGKARAN1Pek. Bongkar beton bertulang / M3Upah :Pekerja6.667Org75,000.00500,025.00Mandor0.333Org110,000.0036,630.00Sub - Upah536,655.00Rp536,655.00TOTALRp536,655.002Pek. Bongkar dinding tembok bata merah / M3Upah :Pekerja0.667Org75,000.0050,025.00Mandor0.033Org110,000.003,630.00Sub - Upah53,655.00Rp53,655.00TOTALRp53,655.003Pek. Bongkar dinding 1/2 bata / M2Upah :Pekerja0.073Org75,000.005,475.00Mandor0.004Org110,000.00440.00Sub - Upah5,915.00Rp5,915.00TOTALRp5,915.004Pek. Bongkar plat beton bertulang / M2Upah :Pekerja0.800Org75,000.0060,000.00Mandor0.040Org110,000.004,400.00Sub - Upah64,400.00Rp64,400.00TOTALRp64,400.005Pek. Bongkar batu kali (tebal kurang dari 50 cm) / M3Upah :Pekerja1.500Org75,000.00112,500.00Mandor0.075Org110,000.008,250.00Sub - Upah120,750.00Rp120,750.00TOTALRp120,750.006Pek. Bongkar batu kali (tebal lebih dari 50 cm) / M3Upah :Pekerja3.000Org75,000.00225,000.00Mandor0.150Org110,000.0016,500.00Sub - Upah241,500.00Rp241,500.00TOTALRp241,500.007Pek. Bongkar finishing lantai / M2Upah :Pekerja0.100Org75,000.007,500.00Mandor0.010Org110,000.001,100.00Sub - Upah8,600.00Rp8,600.00TOTALRp8,600.008Pek. Bongkar paving block / M2Upah :Pekerja0.100Org75,000.007,500.00Mandor0.005Org110,000.00550.00Sub - Upah8,050.00Rp8,050.00TOTALRp8,050.009Pek. Bongkar plesteran / M2Upah :Pekerja0.075Org75,000.005,625.00Mandor0.005Org110,000.00550.00Sub - Upah6,175.00Rp6,175.00TOTALRp6,175.0010Pek. Bongkar Atap genteng / M2Upah :Pekerja0.020Org75,000.001,500.00Mandor0.010Org110,000.001,100.00Sub - Upah2,600.00Rp2,600.00TOTALRp2,600.0011Pek. Bongkar karpusan Atap genteng / M'Upah :Pekerja0.060Org75,000.004,500.00Mandor0.015Org110,000.001,650.00Sub - Upah6,150.00Rp6,150.00TOTALRp6,150.0012Pek. Bongkar Atap Seng/Asbes / M2Upah :Pekerja0.050Org75,000.003,750.00Mandor0.025Org110,000.002,750.00Sub - Upah6,500.00Rp6,500.00TOTALRp6,500.0013Pek. Bongkar kaso reng kayu (kayu akan dipakai lagi) / M2Upah :Pekerja0.100Org75,000.007,500.00Tukang kayu0.025Org90,000.002,250.00Kepala Tukang0.003Org105,000.00315.00Mandor0.005Org110,000.00550.00Sub - Upah10,615.00Rp10,615.00TOTALRp10,615.0014Pek. Bongkar kaso reng kayu (kayu tidak dipakai lagi) / M2Upah :Pekerja0.100Org75,000.007,500.00Mandor0.005Org110,000.00550.00Sub - Upah8,050.00Rp8,050.00TOTALRp8,050.0015Pek. Bongkar kuda2 & loteng kayu (kayu akan dipakai lagi) / M3Upah :Pekerja2.666Org75,000.00199,950.00Tukang kayu4.000Org90,000.00360,000.00Kepala Tukang0.400Org105,000.0042,000.00Mandor0.133Org110,000.0014,630.00Sub - Upah616,580.00Rp616,580.00TOTALRp616,580.0016Pek. Bongkar kuda2 & loteng kayu (kayu tidak dipakai lagi) / M3Upah :Pekerja4.000Org75,000.00300,000.00Mandor0.400Org110,000.0044,000.00Sub - Upah344,000.00Rp344,000.00TOTALRp344,000.0017Pek. Bongkar rangka plafond kayu / M2Upah :Pekerja0.100Org75,000.007,500.00Mandor0.005Org110,000.00550.00Sub - Upah8,050.00Rp8,050.00TOTALRp8,050.0018Pek. Bongkar penutup plafond / M2Upah :Pekerja0.030Org75,000.002,250.00Mandor0.003Org110,000.00330.00Sub - Upah2,580.00Rp2,580.00TOTALRp2,580.00III.PEKERJAAN BETON3.1.BETON TIDAK BERTULANG1MEMBUAT 1 M3 BETON, mutu f'c = 7,4 Mpa (K 100)SNI-2008(Slump 12 cm, w/c = 0,87)Bahan :Semen PC247.00kg1,300.00321,100.00Pasir beton (BD 1400)869.00kg193.13167,825.63Kerikil / split (2-3 cm) (BD 1350)999.00Kg199.63199,430.26Air215.00liter100.0021,500.00Sub - Bahan709,855.88Rp709,855.88Upah :Pekerja1.650Org75,000.00123,750.00Tukang batu0.275Org90,000.0024,750.00Kepala Tukang batu0.028Org100,000.002,800.00Mandor0.083Org110,000.009,130.00Sub - Upah160,430.00Rp160,430.00TOTALRp870,285.882MEMBUAT 1 M3 BETON, mutu f'c = 7,4 Mpa (K 100)SNI-2008(Slump 3-6 cm, w/c = 0,87)Bahan :Semen PC230.00kg1,300.00299,000.00Pasir beton893.00kg193.13172,460.63Kerikil / split (2-3 cm)1,027.00Kg199.63205,019.90Air200.00liter100.0020,000.00Sub - Bahan696,480.52Rp696,480.52Upah :Pekerja1.200Org75,000.0090,000.00Tukang batu0.200Org90,000.0018,000.00Kepala Tukang batu0.020Org100,000.002,000.00Mandor0.060Org110,000.006,600.00Sub - Upah116,600.00Rp116,600.00TOTALRp813,080.523MEMBUAT 1 M3 BETON, mutu f'c = 9.8 Mpa (K 125)SNI-2008(Slump 12 cm, w/c = 0,78)Bahan :Semen PC276.00kg1,300.00358,800.00Pasir beton828.00kg193.13159,907.50Kerikil / split (2-3 cm)1,012.00Kg199.63202,025.45Air215.00liter100.0021,500.00Sub - Bahan742,232.95Rp742,232.95Upah :Pekerja1.650Org75,000.00123,750.00Tukang batu0.275Org90,000.0024,750.00Kepala Tukang batu0.028Org100,000.002,800.00Mandor0.083Org110,000.009,130.00Sub - Upah160,430.00Rp160,430.00TOTALRp902,662.954MEMBUAT 1 M3 BETON, mutu f'c = 12,2 Mpa (K 150)SNI-2008(Slump 12 cm, w/c = 0,72)Bahan :Semen PC299.00kg1,300.00388,700.00Pasir beton799.00kg193.13154,306.88Kerikil / split (2-3 cm)1,017.00Kg199.63203,023.60Air215.00liter100.0021,500.00Sub - Bahan767,530.47Rp767,530.47Upah :Sama dengan upah kerja beton K-125Sub - UpahRp160,430.00TOTALRp927,960.475MEMBUAT 1 M3 BETON, mutu f'c = 14,5 Mpa (K 175)SNI-2008(Slump 12 cm, w/c = 0,66)Bahan :Semen PC326.00kg1,300.00423,800.00Pasir beton760.00kg193.13146,775.00Kerikil / split (2-3 cm)1,029.00Kg199.63205,419.16Air215.00liter100.0021,500.00Sub - Bahan797,494.16Rp797,494.16Upah :Sama dengan upah kerja beton K-125Sub - UpahRp160,430.00TOTALRp957,924.166MEMBUAT 1 M3 BETON, mutu f'c = 16,9 Mpa (K 200)SNI-2008(Slump 12 cm, w/c = 0,61)Bahan :Semen PC352.00kg1,300.00457,600.00Pasir beton731.00kg193.13141,174.38Kerikil / split (2-3 cm)1,031.00Kg199.63205,818.42Air215.00liter100.0021,500.00Sub - Bahan826,092.79Rp826,092.79Upah :Sama dengan upah kerja beton K-125Sub - UpahRp160,430.00TOTALRp986,522.797MEMBUAT 1 M3 BETON, mutu f'c = 19,3 Mpa (K 225)SNI-2008(Slump 12 cm, w/c = 0,58)Bahan :Semen PC352.00kg1,300.00457,600.00Pasir beton731.00kg193.13141,174.38Kerikil / split (2-3 cm)1,031.00Kg199.63205,818.42Air215.00liter100.0021,500.00Sub - Bahan826,092.79Rp826,092.79Upah :Sama dengan upah kerja beton K-125Sub - UpahRp160,430.00TOTALRp986,522.798MEMBUAT 1 M3 BETON, mutu f'c = 21,7 Mpa (K 250)SNI-2008(Slump 12 cm, w/c = 0,56)Bahan :Semen PC384.00kg1,300.00499,200.00Pasir beton692.00kg193.13133,642.50Kerikil / split (2-3 cm)1,039.00Kg199.63207,415.45Air215.00liter100.0021,500.00Sub - Bahan861,757.95Rp861,757.95Upah :Sama dengan upah kerja beton K-125Sub - UpahRp160,430.00TOTALRp1,022,187.959MEMBUAT 1 M3 BETON, mutu f'c = 24,00 Mpa (K 275)SNI-2008(Slump 12 cm, w/c = 0,53)Bahan :Semen PC406.00kg1,300.00527,800.00Pasir beton684.00kg193.13132,097.50Kerikil / split (2-3 cm)1,026.00Kg199.63204,820.27Air215.00liter100.0021,500.00Sub - Bahan886,217.77Rp886,217.77Upah :Sama dengan upah kerja beton K-125Sub - UpahRp160,430.00TOTALRp1,046,647.7710MEMBUAT 1 M3 BETON, mutu f'c = 26,4 Mpa (K 300)SNI-2008(Slump 12 cm, w/c = 0,52)Bahan :Semen PC413.00kg1,300.00536,900.00Pasir beton681.00kg193.13131,518.13Kerikil / split (2-3 cm)1,021.00Kg199.63203,822.12Air215.00liter100.0021,500.00Sub - Bahan893,740.24Rp893,740.24Upah :Sama dengan upah kerja beton K-125Sub - UpahRp160,430.00TOTALRp1,054,170.2411MEMBUAT 1 M3 BETON, mutu f'c = 28,8 Mpa (K 325)SNI-2008(Slump 12 cm, w/c = 0,49)Bahan :Semen PC439.00kg1,300.00570,700.00Pasir beton670.00kg193.13129,393.75Kerikil / split (2-3 cm)1,006.00Kg199.63200,827.67Air215.00liter100.0021,500.00Sub - Bahan922,421.42Rp922,421.42Upah :Pekerja2.100Org75,000.00157,500.00Tukang batu0.350Org90,000.0031,500.00Kepala Tukang batu0.035Org100,000.003,500.00Mandor0.105Org110,000.0011,550.00Sub - Upah204,050.00Rp204,050.00TOTALRp1,126,471.4212MEMBUAT 1 M3 BETON, mutu f'c = 31,2 Mpa (K 350)SNI-2008(Slump 12 cm, w/c = 0,48)Bahan :Semen PC439.00kg1,300.00570,700.00Pasir beton670.00kg193.13129,393.75Kerikil / split (2-3 cm)1,006.00Kg199.63200,827.67Air215.00liter100.0021,500.00Sub - Bahan922,421.42Rp922,421.42Upah :Sama dengan upah kerja beton K-325Sub - UpahRp204,050.00TOTALRp1,126,471.4213MEMBUAT 1 M3 BETON KEDAP AIR, dengan Strorok-100SNI-2008Bahan :Semen PC400.00kg1,300.00520,000.00Pasir beton0.48m3270,375.00129,780.00Kerikil / split (2-3 cm)0.80m3269,500.35215,600.28Strorok-1001.20kg50,000.0060,000.00Air210.00liter100.0021,000.00Sub - Bahan946,380.28Rp946,380.28Upah :Sama dengan upah kerja beton K-325Sub - UpahRp204,050.00TOTALRp1,150,430.283.2.BETON BERTULANG (Lengkap)1MEMBUAT 1 M' KOLOM PRAKTIS (11 x 11 cm)SNI-2008Bahan :Semen PC4.000kg1,300.005,200.00Pasir beton0.006m3270,375.001,622.25Kerikil / split (2-3 cm)0.009m3269,500.352,425.50Kayu kelas III (kayu papan Terentang)0.002M33,045,000.006,090.00Paku 5-12 cm0.010Kg15,356.25153.56Besi beton polos3.000Kg13,125.0039,375.00Kawat beton0.045Kg20,212.50909.56Sub - Bahan55,775.88Rp55,775.88Upah :Pekerja0.180Org75,000.0013,500.00Tukang batu0.020Org90,000.001,800.00Tukang kayu0.020Org90,000.001,800.00Tukang besi0.020Org85,000.001,700.00Kepala Tukang batu0.006Org100,000.00600.00Mandor0.009Org110,000.00990.00Sub - Upah20,390.00Rp20,390.00TOTALRp76,165.880.0121Harga/m3Rp6,294,700.672MEMBUAT 1 M' RING BALOK PRAKTIS (11 x 15 cm)SNI-2008Bahan :Semen PC5.500kg1,300.007,150.00Pasir beton0.009m3270,375.002,433.38Kerikil / split (2-3 cm)0.015m3269,500.354,042.51Kayu kelas III (kayu papan Terentang)0.003M33,045,000.009,135.00Paku 5-12 cm0.020Kg15,356.25307.13Besi beton polos3.600Kg13,125.0047,250.00Kawat beton0.050Kg20,212.501,010.63Sub - Bahan71,328.63Rp71,328.63Upah :Pekerja0.297Org75,000.0022,275.00Tukang batu0.033Org90,000.002,970.00Tukang kayu0.033Org90,000.002,970.00Tukang besi0.033Org85,000.002,805.00Kepala Tukang batu0.010Org100,000.001,000.00Mandor0.015Org110,000.001,650.00Sub - Upah33,670.00Rp33,670.00TOTALRp104,998.630.0165Harga/m3Rp6,363,553.353MEMBUAT 1 M3 SLOOF BETON BERTULANGSNI-2008(200 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.270M33,045,000.00822,150.00Paku 5-12 cm2.000Kg15,356.2530,712.50Minyak bekisting0.600liter35,000.0021,000.00Besi beton polos210.000Kg13,125.002,756,250.00Kawat beton3.000Kg20,212.5060,637.50Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Sub - Bahan4,491,847.78Rp4,491,847.78Upah :Pekerja5.650Org75,000.00423,750.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.560Org90,000.00140,400.00Tukang besi1.400Org85,000.00119,000.00Kepala Tukang batu0.323Org100,000.0032,300.00Mandor0.283Org110,000.0031,130.00Sub - Upah771,330.00Rp771,330.00TOTALRp5,263,177.784MEMBUAT 1 M3 PONDASI BETON BERTULANGSNI-2008(150 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.200M33,045,000.00609,000.00Paku 5-12 cm1.500Kg15,356.2523,034.38Minyak bekisting0.400liter35,000.0014,000.00Besi beton polos157.500Kg13,125.002,067,187.50Kawat beton2.250Kg20,212.5045,478.13Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Sub - Bahan3,559,797.78Rp3,559,797.78Upah :Pekerja5.300Org75,000.00397,500.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.300Org90,000.00117,000.00Tukang besi1.050Org85,000.0089,250.00Kepala Tukang batu0.262Org100,000.0026,200.00Mandor0.265Org110,000.0029,150.00Sub - Upah683,850.00Rp683,850.00TOTALRp4,243,647.785MEMBUAT 1 M3 KOLOM BETON BERTULANGSNI-2008(300 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.400M33,045,000.001,218,000.00Paku 5-12 cm4.000Kg15,356.2561,425.00Minyak bekisting2.000liter35,000.0070,000.00Besi beton polos315.000Kg13,125.004,134,375.00Kawat beton4.500Kg20,212.5090,956.25Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.150M33,360,000.00504,000.00Plywood/multiplex 9mm3.500lmbr110,250.00385,875.00Dolken kayu Galam, dia. 8-10cm, panjang 4m20.000btg36,750.00735,000.00Sub - Bahan8,000,729.03Rp8,000,729.03Upah :Pekerja7.050Org75,000.00528,750.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.650Org90,000.00148,500.00Tukang besi2.100Org85,000.00178,500.00Kepala Tukang batu0.403Org100,000.0040,300.00Mandor0.353Org110,000.0038,830.00Sub - Upah959,630.00Rp959,630.00TOTALRp8,960,359.035.aMEMBUAT 1 M3 KOLOM BETON BERTULANGSNI-2008(250 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.400M33,045,000.001,218,000.00Paku 5-12 cm4.000Kg15,356.2561,425.00Minyak bekisting2.000liter35,000.0070,000.00Besi beton polos262.500Kg13,125.003,445,312.50Kawat beton4.500Kg20,212.5090,956.25Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.150M33,360,000.00504,000.00Plywood/multiplex 9mm3.500lmbr110,250.00385,875.00Dolken kayu Galam, dia. 8-10cm, panjang 4m20.000btg36,750.00735,000.00Sub - Bahan7,311,666.53Rp7,311,666.53Upah :Pekerja7.050Org75,000.00528,750.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.650Org90,000.00148,500.00Tukang besi1.750Org85,000.00148,750.00Kepala Tukang batu0.403Org100,000.0040,300.00Mandor0.353Org110,000.0038,830.00Sub - Upah929,880.00Rp929,880.00TOTALRp8,241,546.535.bMEMBUAT 1 M3 KOLOM BETON BERTULANGSNI-2008(200 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.400M33,045,000.001,218,000.00Paku 5-12 cm4.000Kg15,356.2561,425.00Minyak bekisting2.000liter35,000.0070,000.00Besi beton polos210.000Kg13,125.002,756,250.00Kawat beton4.500Kg20,212.5090,956.25Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.150M33,360,000.00504,000.00Plywood/multiplex 9mm3.500lmbr110,250.00385,875.00Dolken kayu Galam, dia. 8-10cm, panjang 4m20.000btg36,750.00735,000.00Sub - Bahan6,622,604.03Rp6,622,604.03Upah :Pekerja7.050Org75,000.00528,750.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.650Org90,000.00148,500.00Tukang besi1.400Org85,000.00119,000.00Kepala Tukang batu0.403Org100,000.0040,300.00Mandor0.353Org110,000.0038,830.00Sub - Upah900,130.00Rp900,130.00TOTALRp7,522,734.036MEMBUAT 1 M3 "BALOK PLAT" BETON BERTULANGSNI-2008(200 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.320M33,045,000.00974,400.00Paku 5-12 cm3.200Kg15,356.2549,140.00Minyak bekisting1.600liter35,000.0056,000.00Besi beton polos210.000Kg13,125.002,756,250.00Kawat beton3.000Kg20,212.5060,637.50Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.140M33,360,000.00470,400.00Plywood/multiplex 9mm2.800lmbr110,250.00308,700.00Dolken kayu Galam, dia. 8-10cm, panjang 4m16.000btg36,750.00588,000.00Sub - Bahan6,064,625.28Rp6,064,625.28Upah :Pekerja6.350Org75,000.00476,250.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.650Org90,000.00148,500.00Tukang besi1.400Org85,000.00119,000.00Kepala Tukang batu0.333Org100,000.0033,300.00Mandor0.318Org110,000.0034,980.00Sub - Upah836,780.00Rp836,780.00TOTALRp6,901,405.287MEMBUAT 1 M3 "PLAT LANTAI" BETON BERTULANGSNI-2008(150 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.320M33,045,000.00974,400.00Paku 5-12 cm3.200Kg15,356.2549,140.00Minyak bekisting1.600liter35,000.0056,000.00Besi beton polos157.500Kg13,125.002,067,187.50Kawat beton2.250Kg20,212.5045,478.13Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.120M33,360,000.00403,200.00Plywood/multiplex 9mm2.800lmbr110,250.00308,700.00Dolken kayu Galam, dia. 8-10cm, panjang 4m32.000btg36,750.001,176,000.00Sub - Bahan5,881,203.41Rp5,881,203.41Upah :Pekerja5.300Org75,000.00397,500.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.300Org90,000.00117,000.00Tukang besi1.050Org85,000.0089,250.00Kepala Tukang batu0.265Org100,000.0026,500.00Mandor0.265Org110,000.0029,150.00Sub - Upah684,150.00Rp684,150.00TOTALRp6,565,353.418MEMBUAT 1 M3 "PLAT LANTAI" BETON BERTULANGSNI-2008(150 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.320M33,045,000.00974,400.00Paku 5-12 cm3.200Kg15,356.2549,140.00Minyak bekisting1.600liter35,000.0056,000.00Besi beton polos157.500Kg13,125.002,067,187.50Kawat beton2.250Kg20,212.5045,478.13Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.120M33,360,000.00403,200.00Plywood/multiplex 9mm2.800lmbr110,250.00308,700.00Dolken kayu Galam, dia. 8-10cm, panjang 4m32.000btg36,750.001,176,000.00Sub - Bahan5,881,203.41Rp5,881,203.41Upah :Pekerja5.300Org75,000.00397,500.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.300Org90,000.00117,000.00Tukang besi1.050Org85,000.0089,250.00Kepala Tukang batu0.265Org100,000.0026,500.00Mandor0.265Org110,000.0029,150.00Sub - Upah684,150.00Rp684,150.00TOTALRp6,565,353.418.aMEMBUAT 1 M3 "PLAT LANTAI" BETON BERTULANGSNI-2008(125 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.320M33,045,000.00974,400.00Paku 5-12 cm3.200Kg15,356.2549,140.00Minyak bekisting1.600liter35,000.0056,000.00Besi beton polos131.250Kg13,125.001,722,656.25Kawat beton2.250Kg20,212.5045,478.13Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.120M33,360,000.00403,200.00Plywood/multiplex 9mm2.800lmbr110,250.00308,700.00Dolken kayu Galam, dia. 8-10cm, panjang 4m32.000btg36,750.001,176,000.00Sub - Bahan5,536,672.16Rp5,536,672.16Upah :Pekerja5.300Org75,000.00397,500.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.300Org90,000.00117,000.00Tukang besi1.050Org85,000.0089,250.00Kepala Tukang batu0.265Org100,000.0026,500.00Mandor0.265Org110,000.0029,150.00Sub - Upah684,150.00Rp684,150.00TOTALRp6,220,822.168.bMEMBUAT 1 M3 "PLAT LANTAI" BETON BERTULANGSNI-2008(100 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.320M33,045,000.00974,400.00Paku 5-12 cm3.200Kg15,356.2549,140.00Minyak bekisting1.600liter35,000.0056,000.00Besi beton polos105.000Kg13,125.001,378,125.00Kawat beton2.250Kg20,212.5045,478.13Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.120M33,360,000.00403,200.00Plywood/multiplex 9mm2.800lmbr110,250.00308,700.00Dolken kayu Galam, dia. 8-10cm, panjang 4m32.000btg36,750.001,176,000.00Sub - Bahan5,192,140.91Rp5,192,140.91Upah :Pekerja5.300Org75,000.00397,500.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.300Org90,000.00117,000.00Tukang besi1.050Org85,000.0089,250.00Kepala Tukang batu0.265Org100,000.0026,500.00Mandor0.265Org110,000.0029,150.00Sub - Upah684,150.00Rp684,150.00TOTALRp5,876,290.919MEMBUAT 1 M3 "DINDING" BETON BERTULANGSNI-2008(150 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.240M33,045,000.00730,800.00Paku 5-12 cm3.200Kg15,356.2549,140.00Minyak bekisting1.600liter35,000.0056,000.00Besi beton polos157.500Kg13,125.002,067,187.50Kawat beton2.250Kg20,212.5045,478.13Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.160M33,360,000.00537,600.00Plywood/multiplex 9mm2.800lmbr110,250.00308,700.00Dolken kayu Galam, dia. 8-10cm, panjang 4m24.000btg36,750.00882,000.00Sub - Bahan5,478,003.41Rp5,478,003.41Upah :Pekerja5.300Org75,000.00397,500.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.300Org90,000.00117,000.00Tukang besi1.050Org85,000.0089,250.00Kepala Tukang batu0.262Org100,000.0026,200.00Mandor0.265Org110,000.0029,150.00Sub - Upah683,850.00Rp683,850.00TOTALRp6,161,853.419.aMEMBUAT 1 M3 "DINDING" BETON BERTULANGSNI-2008(200 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.250M33,045,000.00761,250.00Paku 5-12 cm3.000Kg15,356.2546,068.75Minyak bekisting1.200liter35,000.0042,000.00Besi beton polos210.000Kg13,125.002,756,250.00Kawat beton3.000Kg20,212.5060,637.50Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.105M33,360,000.00352,800.00Plywood/multiplex 9mm2.500lmbr110,250.00275,625.00Dolken kayu Galam, dia. 8-10cm, panjang 4m24.000btg36,750.00882,000.00Sub - Bahan5,977,729.03Rp5,977,729.03Upah :Pekerja5.650Org75,000.00423,750.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.560Org90,000.00140,400.00Tukang besi1.400Org85,000.00119,000.00Kepala Tukang batu0.323Org100,000.0032,300.00Mandor0.283Org110,000.0031,130.00Sub - Upah771,330.00Rp771,330.00TOTALRp6,749,059.0310MEMASANG 1M' PVC WATERSTOP, lebar 20 cmSNI-2008Bahan :Waterstop lebar 20 cm1.05m'60,000.0063,000.00Sub - Bahan63,000.00Rp63,000.00Upah :Pekerja0.070Org75,000.005,250.00Tukang batu0.035Org90,000.003,150.00Kepala Tukang batu0.004Org100,000.00400.00Mandor0.004Org110,000.00440.00Sub - Upah9,240.00Rp9,240.00TOTALRp72,240.0011PEK. BETON TUMBUK (1 : 3 : 5) / M3 (slump = 12 cm)Bahan :Semen PC247.000kg1,300.00321,100.00Pasir beton0.500M3270,375.00135,187.50Koral beton1.000Kg286,125.00286,125.00Air215.000ltr100.0021,500.00Sub - Bahan763,912.50Rp763,912.50Upah :Kep. Tukang Batu0.028Org100,000.002,800.00Tukang batu0.275Org90,000.0024,750.00Pekerja1.650Org75,000.00123,750.00Mandor0.083Org110,000.009,130.00Sub - Upah160,430.00Rp160,430.00Rp924,342.50Lantai kerja tebal 5 cmRp46,217.1312PEK. BETON SIKLUP SUMURAN / M3 (40% bt.belah + 60% beton 1:2:3)SNI-2008Bahan :Semen PC194.00Kg1,300.00252,200.00(beton)Batu kali0.480M3257,250.00123,480.00Pasir beton0.312M3270,375.0084,357.00Koral beton0.468M3286,125.00133,906.50Besi beton126.00Kg13,125.001,653,750.00Kawat beton1.800M320,212.5036,382.50Sub - Bahan2,284,076.00Rp2,284,076.00Upah :Pekerja3.400Org75,000.00255,000.00Tukang batu0.850Org90,000.0076,500.00Kep. Tukang Batu0.085Org100,000.008,500.00Mandor0.170Org110,000.0018,700.00Sub - Upah358,700.00Rp358,700.00TOTALRp2,642,776.0013PEK. BETON LT. KERJA (1 : 3 : 5) + TUL. RINGAN / M3Bahan :Semen PC5.300zak65,000.00344,500.00Pasir beton0.500M3270,375.00135,187.50Koral beton1.000Kg286,125.00286,125.00Sub - Bahan765,812.50Rp765,812.50Upah :Kep. Tukang Batu0.050Org100,000.005,000.0050%Tukang batu0.500Org90,000.0045,000.00Pekerja6.000Org75,000.00450,000.00Mandor0.300Org110,000.0033,000.00Sub - Upah533,000.00Rp266,500.00Bahan :Besi beton (45 kg)45.000Kg13,125.00590,625.00(besi)Kawat beton0.400M320,212.508,085.00Sub - Bahan598,710.00Rp598,710.00Upah :100 kg pembesian (75%)Kep. Tukang Besi0.350Org90,000.0031,500.00Tukang besi1.050Org85,000.0089,250.00Pekerja3.150Org75,000.00236,250.00Mandor0.020Org110,000.002,200.00Sub - Upah359,200.00Sub-Upah 100kg (75%)269,400.00Rp121,230.00Rp1,752,252.5014BETON PLAT (diatas tanah) (1 : 2 : 3) + TUL. RINGAN / M3Bahan :Semen PC7.000zak65,000.00455,000.00Pasir Beton0.540M3270,375.00146,002.50Split0.820M3269,500.35220,990.29Sub - Bahan821,992.79Rp821,992.79Upah :Kep. Tukang Batu0.040Org100,000.004,000.00Tukang batu0.400Org90,000.0036,000.00Pekerja4.000Org75,000.00300,000.00Mandor0.020Org110,000.002,200.00Sub - Upah342,200.00Rp342,200.00Bahan :Besi beton (tul 8-20, 1 lps)75.000Kg13,125.00984,375.00(besi)Kawat beton0.500M320,212.5010,106.25Sub - Bahan994,481.25Rp994,481.25Upah :untuk pembesian 75 kgRp202,050.00Rp2,360,724.043.3PEKERJAAN BEKISTING1MEMASANG 1 M2 BEKISTING untuk BALOKSNI-2008Bahan :Kayu kelas III (Kayu Rimba Campuran)0.040M32,415,000.0096,600.00Balok kayu kelas II (kayu Rimba Campuran)0.018M32,415,000.0043,470.00Kayu Dolken (kayu Galam 8-10cm - 400cm2.000btg36,750.0073,500.00Plywood tebal 9 mm (122x244 cm)0.350M2110,250.0038,587.50Minyak bekisting0.200liter30,000.006,000.00Paku 5-12 cm0.400Kg15,356.256,142.50bekisting 2x pakaiSub - Bahan264,300.00Rp264,300.00132,150.00Upah :Kep. Tukang Kayu0.033Org105,000.003,465.00Tukang kayu0.330Org90,000.0029,700.00Pekerja0.660Org75,000.0049,500.00Mandor0.033Org110,000.003,630.00Sub - Upah86,295.00Rp86,295.0086,295.00TOTALRp350,595.00218,445.002MEMASANG 1 M2 BEKISTING untuk KOLOMSNI-2008Bahan :Kayu kelas III (Kayu Rimba Campuran)0.040M32,415,000.0096,600.00Balok kayu kelas II (kayu Rimba Campuran)0.015M32,415,000.0036,225.00Kayu Dolken (kayu Galam 8-10cm - 400cm2.000btg36,750.0073,500.00Plywood tebal 9 mm (122x244 cm)0.350M2110,250.0038,587.50Minyak bekisting0.200liter30,000.006,000.00Paku 5-12 cm0.400Kg15,356.256,142.50bekisting 2x pakaiSub - Bahan257,055.00Rp257,055.00128,527.50Upah :Kep. Tukang Kayu0.033Org105,000.003,465.00Tukang kayu0.330Org90,000.0029,700.00Pekerja0.660Org75,000.0049,500.00Mandor0.033Org110,000.003,630.00Sub - Upah86,295.00Rp86,295.0086,295.00TOTALRp343,350.00214,822.503MEMASANG 1 M2 BEKISTING untuk PLAT LANTAISNI-2008Bahan :Kayu kelas III (Kayu Rimba Campuran)0.040M32,415,000.0096,600.00Balok kayu kelas II (kayu Rimba Campuran)0.015M32,415,000.0036,225.00Kayu Dolken (kayu Galam 8-10cm - 400cm6.000btg36,750.00220,500.00Plywood tebal 9 mm (122x244 cm)0.350M2110,250.0038,587.50Minyak bekisting0.200liter30,000.006,000.00Paku 5-12 cm0.400Kg15,356.256,142.50bekisting 2x pakaiSub - Bahan404,055.00Rp404,055.00202,027.50Upah :Sama dengan upah bekisting Kolom/balokSub - UpahRp86,295.0086,295.00TOTALRp490,350.00288,322.504MEMASANG 1 M2 BEKISTING untuk TANGGASNI-2008Bahan :Kayu kelas III (Kayu Rimba Campuran)0.030M32,415,000.0072,450.00Balok kayu kelas II (kayu Rimba Campuran)0.015M32,415,000.0036,225.00Kayu Dolken (kayu Galam 8-10cm - 400cm2.000btg36,750.0073,500.00Plywood tebal 9 mm (122x244 cm)0.350M2110,250.0038,587.50Minyak bekisting0.150liter30,000.004,500.00Paku 5-12 cm0.400Kg15,356.256,142.50bekisting 2x pakaiSub - Bahan231,405.00Rp231,405.00115,702.50Upah :Sama dengan upah bekisting Kolom/balokSub - UpahRp86,295.0086,295.00TOTALRp317,700.00201,997.505MEMASANG 1 M2 BEKISTING untuk DINDINGSNI-2008Bahan :Kayu kelas III (Kayu Rimba Campuran)0.030M32,415,000.0072,450.00Balok kayu kelas II (kayu Rimba Campuran)0.020M32,415,000.0048,300.00Kayu Dolken (kayu Galam 8-10cm - 400cm3.000btg36,750.00110,250.00Plywood tebal 9 mm (122x244 cm)0.350M2110,250.0038,587.50Minyak bekisting0.200liter30,000.006,000.00Paku 5-12 cm0.400Kg15,356.256,142.50Formite/spacer/penjaga jarak bekisting4.000bh10,000.0040,000.00bekisting 2x pakaiSub - Bahan321,730.00Rp321,730.00160,865.00Upah :Sama dengan upah bekisting Kolom/balokSub - UpahRp86,295.0086,295.00TOTALRp408,025.00247,160.006MEMASANG 1 M2 BEKISTING untuk PONDASISNI-2008Bahan :Kayu kelas III (Kayu Rimba Campuran)0.040M32,415,000.0096,600.00Minyak bekisting0.300liter30,000.009,000.00Paku 5-12 cm0.100Kg15,356.251,535.63Sub - Bahan107,135.63Rp107,135.63Upah :Kep. Tukang Kayu0.026Org105,000.002,730.00Tukang kayu0.260Org90,000.0023,400.00Pekerja0.520Org75,000.0039,000.00Mandor0.026Org110,000.002,860.00Sub - Upah67,990.00Rp67,990.00TOTALRp175,125.637MEMASANG 1 M2 BEKISTING untuk SLOOFSNI-2008Bahan :Kayu kelas III (Kayu Rimba Campuran)0.045M32,415,000.00108,675.00Minyak bekisting0.300liter30,000.009,000.00Paku 5-12 cm0.100Kg15,356.251,535.63Sub - Bahan119,210.63Rp119,210.63Upah :Kep. Tukang Kayu0.026Org105,000.002,730.00Tukang kayu0.260Org90,000.0023,400.00Pekerja0.520Org75,000.0039,000.00Mandor0.026Org110,000.002,860.00Sub - Upah67,990.00Rp67,990.00TOTALRp187,200.633.4PEK. PEMBESIAN1PEMBESIAN (10 Kg) dengan besi polos atau ulirSNI-2008Bahan :Besi beton10.50Kg13,125.00137,812.50Kawat beton0.15Kg20,212.503,031.88Sub - Bahan140,844.38Rp140,844.38Upah :Pekerja0.070Org75,000.005,250.00Tukang besi0.070Org85,000.005,950.00Kep. Tukang Besi0.007Org90,000.00630.00Mandor0.004Org110,000.00440.00Sub - Upah12,270.00Rp12,270.00SUB-TOTALRp153,114.38atau / KGRp15,311.442MEMASANG 10 Kg KABEL PRESSTRESEDSNI-2008POLOS/STARNDSBahan :Besi beton10.50Kg13,125.00137,812.50Kawat beton0.10Kg20,212.502,021.25Sub - Bahan139,833.75Rp139,833.75Upah :Pekerja0.050Org75,000.003,750.00Tukang besi0.050Org85,000.004,250.00Kep. Tukang Besi0.005Org90,000.00450.00Mandor0.003Org110,000.00330.00Sub - Upah8,780.00Rp8,780.00SUB-TOTALRp148,613.75atau / KGRp14,861.383MEMASANG 1 KG JARING KAWAT BAJA / WIRE MESHSNI-2008Bahan :Jaring kawat baja dilas (wire mesh)1.02Kg12,500.0012,750.00Kawat beton0.05Kg20,212.501,010.63Sub - Bahan13,760.63Rp13,760.63Upah :Pekerja0.025Org75,000.001,875.00Tukang besi0.025Org85,000.002,125.00Kep. Tukang Besi0.002Org90,000.00180.00Mandor0.001Org110,000.00110.00Sub - Upah4,290.00Rp4,290.00SUB-TOTALRp18,050.634PEMBESIAN (115 Kg) / M3 BETONBahan :Besi beton126.50Kg13,125.001,660,312.50Kawat beton2.00Kg20,212.5040,425.00Sub - Bahan1,700,737.50Rp1,700,737.50Upah : Dasar upah / Kg, sama dengan upah besi 100 KgRp141,105.00SUB-TOTALRp1,841,842.505PEMBESIAN (125 Kg) / M3 BETONBahan :Besi beton137.50Kg13,125.001,804,687.50Kawat beton2.00Kg20,212.5040,425.00Sub - Bahan1,845,112.50Rp1,845,112.50Upah : Dasar upah / Kg, sama dengan upah besi 100 KgRp153,375.00SUB-TOTALRp1,998,487.506PEMBESIAN (150 Kg) / M3 BETONBahan :Besi beton165.00Kg13,125.002,165,625.00Kawat beton2.00Kg20,212.5040,425.00Sub - Bahan2,206,050.00Rp2,206,050.00Upah : Dasar upah / Kg, sama dengan upah besi 100 KgRp184,050.00SUB-TOTALRp2,390,100.007PEMBESIAN (175 Kg) / M3 BETONBahan :Besi beton192.50Kg13,125.002,526,562.50Kawat beton2.00Kg20,212.5040,425.00Sub - Bahan2,566,987.50Rp2,566,987.50Upah : Dasar upah / Kg, sama dengan upah besi 100 KgRp214,725.00SUB-TOTALRp2,781,712.508PEMBESIAN (200 Kg) / M3 BETONBahan :Besi beton220.00Kg13,125.002,887,500.00Kawat beton2.00Kg20,212.5040,425.00Sub - Bahan2,927,925.00Rp2,927,925.00Upah : Dasar upah / Kg, sama dengan upah besi 100 KgRp245,400.00SUB-TOTALRp3,173,325.009PEMBESIAN (225 Kg) / M3 BETONBahan :Besi beton247.50Kg13,125.003,248,437.50Kawat beton2.00Kg20,212.5040,425.00Sub - Bahan3,288,862.50Rp3,288,862.50Upah : Dasar upah / Kg, sama dengan upah besi 100 KgRp276,075.00SUB-TOTALRp3,564,937.5010PEMBESIAN (250 Kg) / M3 BETONBahan :Besi beton275.00Kg13,125.003,609,375.00Kawat beton2.00Kg20,212.5040,425.00Sub - Bahan3,649,800.00Rp3,649,800.00Upah : Dasar upah / Kg, sama dengan upah besi 100 KgRp306,750.00SUB-TOTALRp3,956,550.003.5.REKAPITULASI PEKERJAAN BETON TULANG3.5.1HARGA BETON TULANG PLAT DAK / M3, TBL. 12 CM1.BETON PLAT DAK, TULANGAN 100 Kg /M3A.BEKISTING8.33M2490,350.004,086,250.00B.BETON, mutu f'c = 19,3 Mpa (K 225)1.00M3986,522.79986,522.79C.PEMBESIAN 100 KG100.00KG15,311.441,531,143.75Rp6,603,916.542.BETON PLAT DAK, TULANGAN 100 Kg /M3A.BEKISTING8.33M2490,350.004,086,250.00B.BETON, mutu f'c = 19,3 Mpa (K 225)1.00M3986,522.79986,522.79C.PEMBESIAN 125 KG125.00KG15,311.441,913,929.69Rp6,986,702.483.5.2HARGA BETON TULANG BALOK PLAT / M31.BETON BALOK PLAT , TULANGAN 150 Kg /M3A. HARGA BEKISTING0.00B. HARGA BETON 1Pc : 2Ps : 3Spl0.00C. HARGA PEMBESIAN (150 Kg)0.000.03.5.3HARGA BETON TULANG KOLOM / M31.BETON KOLOM, TULANGAN 150 Kg / M3A. HARGA BEKISTING0.00B. HARGA BETON 1Pc : 2Ps : 3Spl0.00C. HARGA PEMBESIAN (150 Kg)0.000.03.5.4BETON BALOK TEA-BEAM / M3A. HARGA BEKISTING0.00B. HARGA BETON 1Pc : 2Ps : 3Spl0.00C. HARGA PEMBESIAN (175 Kg), 6 d 13 + d8-2000.000.03.5.5HARGA BETON TULANG PND. POER / M31.BETON PONDASI POER, TULANGAN 100 Kg / M3A. HARGA BEKISTING0.00B. HARGA BETON 1Pc : 2Ps : 3Spl0.00C. HARGA PEMBESIAN (100 Kg)0.000.03.5.6HARGA BETON TULANG JEMBATAN MASUK / M31BETON JEMBATAN BETON MASUK, TULANGAN 150 Kg / M3A.BEKISTING6.67M2490,350.003,269,000.00B.BETON, mutu f'c = 19,3 Mpa (K 225)1.00M3986,522.79986,522.79C.PEMBESIAN 125 KG150.00KG15,311.442,296,715.63Rp6,552,238.42IV.PEK. PASANGAN4.1.PAS. AANSTAMPENG BATU KALISNI-2008Bahan :Batu kali1.200M3257,250.00308,700.00Pasir urug0.432M3291,375.00125,874.00Sub - Bahan434,574.00Rp434,574.00Upah :Pekerja0.780Org75,000.0058,500.00Tukang batu0.390Org90,000.0035,100.00Kep. Tukang Batu0.039Org100,000.003,900.00Mandor0.039Org110,000.004,290.00Sub - Upah101,790.00Rp101,790.00Total Harga Pond. Bt. Kali 1Pc : 3Ps / m3Rp536,364.004.2.PEK. PONDASI BT. KALI1PEK. PONDASI BT. KALI 1Pc : 3PsBahan :Semen PCSNI-2008202.000Kg1,300.00262,600.00Batu kali1.200M3257,250.00308,700.00Pasir pasang0.485M3265,125.00128,585.63Sub - Bahan699,885.63Rp699,885.63Upah :Pekerja1.500Org75,000.00112,500.00Tukang batu0.750Org90,000.0067,500.00Kep. Tukang Batu0.075Org100,000.007,500.00Mandor0.075Org110,000.008,250.00Sub - Upah195,750.00Rp195,750.00Total Harga Pond. Bt. Kali 1Pc : 3Ps / m3Rp895,635.632PEK. PONDASI BT. KALI 1Pc : 4PsBahan :Semen PCSNI-2008163.000Kg1,300.00211,900.00Batu kali1.200M3257,250.00308,700.00Pasir pasang0.520M3265,125.00137,865.00Sub - Bahan658,465.00Rp658,465.00Upah : sama dengan upah Pond. 1Pc : 3PsRp195,750.00Total Harga Pond. Bt. Kali 1Pc : 4Ps / m3Rp854,215.003PEK. PONDASI BT. KALI 1Pc : 5PsSNI-2008Bahan :Semen PC136.000Kg1,300.00176,800.00Batu kali1.200M3257,250.00308,700.00Pasir pasang0.544M3265,125.00144,228.00Sub - Bahan629,728.00Rp629,728.00Upah : sama dengan upah Pond. 1Pc : 3PsRp195,750.00Total Harga Pond. Bt. Kali 1Pc : 5Ps / m3Rp825,478.004PEK. PONDASI BT. KALI 1Pc : 6PsSNI-2008Bahan :Semen PC117.000Kg1,300.00152,100.00Batu kali1.200M3257,250.00308,700.00Pasir pasang0.561M3265,125.00148,735.13Sub - Bahan609,535.13Rp609,535.13Upah : sama dengan upah Pond. 1Pc : 3PsRp195,750.00Total Harga Pond. Bt. Kali 1Pc : 5Ps / m3Rp805,285.135PEK. PONDASI BT. KALI 1Pc : 8PsSNI-2008Bahan :Semen PC91.000Kg1,300.00118,300.00Batu kali1.200M3257,250.00308,700.00Pasir pasang0.584M3265,125.00154,833.00Sub - Bahan581,833.00Rp581,833.00Upah : sama dengan upah Pond. 1Pc : 3PsRp195,750.00Total Harga Pond. Bt. Kali 1Pc : 5Ps / m3Rp777,583.006PEK. PONDASI BT. KALI 1KP : 1SM : 2PsSNI-2008Bahan :Kapur padam0.170M3210,000.0035,700.00Semen Merah0.170M3183,750.0031,237.50Batu kali1.200M3257,250.00308,700.00Pasir pasang0.340M3265,125.0090,142.50Sub - Bahan465,780.00Rp465,780.00Upah : sama dengan upah Pond. 1Pc : 3PsRp195,750.00Total Harga Pond. Bt. Kali 1Pc : 5Ps / m3Rp661,530.004.3.PEK. DINDING BATA MERAH (1 Batu)1PEK. DINDING BATA MERAH (1 Batu), 1Pc : 2Ps / M2SNI-2008Bahan :Semen PC43.500kg1,300.0056,550.00Batu bata uk. 5 x 11 x 22 cm140.00Bh630.0088,200.00Pasir pasang0.080M3265,125.0021,210.00Sub - Bahan165,960.00Rp165,960.00Upah :Pekerja0.600Org75,000.0045,000.00Tukang batu0.200Org90,000.0018,000.00Kep. Tukang Batu0.020Org100,000.002,000.00Mandor0.030Org110,000.003,300.00Sub - Upah68,300.00Rp68,300.00Total harga / M2Rp234,260.002PEK. DINDING BATA MERAH (1 Batu), 1Pc : 3Ps / M2SNI-2008Bahan :Semen PC32.950kg1,300.0042,835.00Batu bata uk. 5 x 11 x 22 cm140.00Bh630.0088,200.00Pasir pasang0.091M3265,125.0024,126.38Sub - Bahan155,161.38Rp155,161.38Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp68,300.00Total harga / M2Rp223,461.383PEK. DINDING BATA MERAH (1 Batu), 1Pc : 4Ps / M2SNI-2008Bahan :Semen PC26.550kg1,300.0034,515.00Batu bata uk. 5 x 11 x 22 cm140.00Bh630.0088,200.00Pasir pasang0.093M3265,125.0024,656.63Sub - Bahan147,371.63Rp147,371.63Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp68,300.00Total harga / M2Rp215,671.634PEK. DINDING BATA MERAH (1 Batu), 1Pc : 5Ps / M2SNI-2008Bahan :Semen PC22.200kg1,300.0028,860.00Batu bata uk. 5 x 11 x 22 cm140.00Bh630.0088,200.00Pasir pasang0.102M3265,125.0027,042.75Sub - Bahan144,102.75Rp144,102.75Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp68,300.00Total harga / M2Rp212,402.755PEK. DINDING BATA MERAH (1 Batu), 1Pc : 6Ps / M2SNI-2008Bahan :Semen PC18.500kg1,300.0024,050.00Batu bata uk. 5 x 11 x 22 cm140.00Bh630.0088,200.00Pasir pasang0.122M3265,125.0032,345.25Sub - Bahan144,595.25Rp144,595.25Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp68,300.00Total harga / M2Rp212,895.254.4.PEK. DINDING BATA MERAH (1/2 Batu)1PEK. DINDING BATA MERAH (1/2 Batu), 1Pc : 2Ps / M2SNI-2008Bahan :Semen PC18.950kg1,300.0024,635.00Batu bata uk. 5 x 11 x 22 cm70.00Bh630.0044,100.00Pasir pasang0.038M3265,125.0010,074.75Sub - Bahan78,809.75Rp78,809.75Upah :Pekerja0.300Org75,000.0022,500.00Tukang batu0.100Org90,000.009,000.00Kep. Tukang Batu0.010Org100,000.001,000.00Mandor0.015Org110,000.001,650.00Sub - Upah34,150.00Rp34,150.00Total harga / M2Rp112,959.752PEK. DINDING BATA MERAH (1/2 Batu), 1Pc : 3Ps / M2SNI-2008Bahan :Semen PC14.370kg1,300.0018,681.00Batu bata uk. 5 x 11 x 22 cm70.00Bh630.0044,100.00Pasir pasang0.040M3265,125.0010,605.00Sub - Bahan73,386.00Rp73,386.00Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp34,150.00Total harga / M2Rp107,536.003PEK. DINDING BATA MERAH (1/2 Batu), 1Pc : 4Ps / M2SNI-2008Bahan :Semen PC11.500kg1,300.0014,950.00Batu bata uk. 5 x 11 x 22 cm70.00Bh630.0044,100.00Pasir pasang0.043M3265,125.0011,400.38Sub - Bahan70,450.38Rp70,450.38Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp34,150.00Total harga / M2Rp104,600.384PEK. DINDING BATA MERAH (1/2 Batu), 1Pc : 5Ps / M2SNI-2008Bahan :Semen PC9.680kg1,300.0012,584.00Batu bata uk. 5 x 11 x 22 cm70.00Bh630.0044,100.00Pasir pasang0.045M3265,125.0011,930.63Sub - Bahan68,614.63Rp68,614.63Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp34,150.00Total harga / M2Rp102,764.635PEK. DINDING BATA MERAH (1/2 Batu), 1Pc : 6Ps / M2SNI-2008Bahan :Semen PC8.320kg1,300.0010,816.00Batu bata uk. 5 x 11 x 22 cm70.00Bh630.0044,100.00Pasir pasang0.049M3265,125.0012,991.13Sub - Bahan67,907.13Rp67,907.13Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp34,150.00Total harga / M2Rp102,057.136PEK. DINDING BATA MERAH (1/2 Batu), 1Pc : 8Ps / M2SNI-2008Bahan :Semen PC6.500kg1,300.008,450.00Batu bata uk. 5 x 11 x 22 cm70.00Bh630.0044,100.00Pasir pasang0.050M3265,125.0013,256.25Sub - Bahan65,806.25Rp65,806.25Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp34,150.00Total harga / M2Rp99,956.257DINDING BATA MERAH (1/2 Batu), 1Pc : 3KP : 10Ps / M2SNI-2008Bahan :Semen PC4.500kg1,300.005,850.00Kapur Padam0.015M3210,000.003,150.00Pasir pasang0.050M3265,125.0013,256.25Batu bata uk. 5 x 11 x 22 cm70.00Bh630.0044,100.00Sub - Bahan66,356.25Rp66,356.25Upah :Pekerja0.300Org75,000.0022,500.00Tukang batu0.100Org90,000.009,000.00Kep. Tukang Batu0.010Org100,000.001,000.00Mandor0.015Org110,000.001,650.00Sub - Upah34,150.00Rp34,150.00Total harga / M2Rp100,506.258DINDING BATA MERAH (1/2 Batu), 1KP : 1SM : 1Ps / M2SNI-2008Bahan :Semen Merah0.018m3183,750.003,307.50Kapur Padam0.018M3210,000.003,780.00Pasir pasang0.018M3265,125.004,772.25Batu bata uk. 5 x 11 x 22 cm70.00Bh630.0044,100.00Sub - Bahan55,959.75Rp55,959.75Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp34,150.00Total harga / M2Rp90,109.754.5.PEK. DINDING "HEBEL1PEK. DINDING "HEBEL" (tbl 10 cm) 1Pc : 3Ps / M2Bahan :Semen PC (ambil koefisien pas bata 1Pc : 3Ps)14.370kg1,300.0018,681.00Batu bata ringan (ex Hebel), 10x16x60 cm8.340bh8,542.8071,246.95Pasir pasang (keofesien diragukan)0.7280.0728M3265,125.0019,301.10Sub - Bahan109,229.05Rp109,229.05Upah :Pekerja0.350Org75,000.0026,250.00Tukang batu0.150Org90,000.0013,500.00Kep. Tukang Batu0.015Org100,000.001,500.00Mandor0.018Org110,000.001,980.00Sub - Upah43,230.00Rp43,230.00Total harga / M2Rp152,459.052PEK. DINDING "HEBEL" (tbl 7 cm) 1Pc : 3Ps / M2Bahan :Semen PC (ambil koefisien pas bata 1Pc : 3Ps)14.370kg1,300.0018,681.00Batu bata ringan (ex Hebel), 7x16x60 cm8.340bh5,979.9649,872.87Pasir pasang (keofesien diragukan)0.7280.0728M3265,125.0019,301.10Sub - Bahan87,854.97Rp87,854.97Upah :Sama dengan upah pas Hebel 10 cmSub - UpahRp43,230.00Total harga / M2Rp131,084.973PEK. DINDING "HEBEL" (tbl 10 cm), perekat Mortar / M2Bahan :Batu bata ringan (ex Hebel), 10x16x60 cm8.500bh8,542.8072,613.80Perekat PM-100 / MU-100 (perekat)3.200kg1,575.005,040.00Sub - Bahan77,653.80Rp77,653.80Upah :Pekerja0.300Org75,000.0022,500.00Tukang batu0.150Org90,000.0013,500.00Kep. Tukang Batu0.015Org100,000.001,500.00Mandor0.015Org110,000.001,650.00Sub - Upah39,150.00Rp39,150.00Total harga / M2Rp116,803.804PEK. DINDING "HEBEL" (tbl 7 cm), perekat Mortar / M2Bahan :Batu bata ringan (ex Hebel), 7x16x60 cm8.500bh5,979.9650,829.66Perekat PM-100 / MU-100 (perekat)2.400M31,575.003,780.00Sub - Bahan54,609.66Rp54,609.66Upah :Sama dengan upah pas Hebel 10 cmSub - UpahRp39,150.00Total harga / M2Rp93,759.664.6.PEK. DINDING BATACO 1Pc : 3Ps / M2Bahan :Semen PC (ambil koefisien pas bata 1Pc : 3Ps)14.370kg1,300.0018,681.00Bataco semen, 10x19x40 cm12.50Bh4,200.0052,500.00Pasir pasang (keofesien diragukan)0.7280.0728M3265,125.0019,301.10Sub - Bahan90,482.10Rp90,482.10Upah :Pekerja0.350Org75,000.0026,250.00Tukang batu0.150Org90,000.0013,500.00Kep. Tukang Batu0.015Org100,000.001,500.00Mandor0.018Org110,000.001,980.00Sub - Upah43,230.00Rp43,230.00T O T A LRp133,712.104.7.PEK. DINDING GLASSBLOCK / M2Bahan :Semen PC (ambil koefisien pas bata 1Pc : 3Ps)14.370kg1,300.0018,681.00Glassblock 20/2025.000Bh31,500.00787,500.00Pasir pasang (keofesien diragukan)0.0420M3265,125.0011,135.25Sub - Bahan817,316.25Rp817,316.25Upah :Pekerja0.350Org75,000.0026,250.00Tukang batu0.150Org90,000.0013,500.00Kep. Tukang Batu0.015Org100,000.001,500.00Mandor0.018Org110,000.001,980.00Sub - Upah43,230.00Rp43,230.00T O T A LRp860,546.254.8.PEK. DINDING BATA KRAWANG / M2Bahan :Semen PC0.420zak65,000.0027,300.00Rooster bata merah 12x24x24 cm16.000Bh5,075.7081,211.20Pasir pasang0.050M3265,125.0013,256.25Sub - Bahan121,767.45Rp121,767.45Upah : sama dg upah pas glassblokRp43,230.00T O T A LRp164,997.454.9.PEK. DINDING ALLUMUNIUM COMPOSIT PANEL (ACP) / M2Bahan :Allumunium Composit Panel (ACP)1.0000m2400,000.00400,000.00Rangka allumunium hollow5.000m'12,500.0062,500.00Paku skrup0.580kg45,000.0026,100.00Sealant0.8000m'8,531.256,825.00Sub - Bahan495,425.00Rp495,425.00Upah :Pekerja1.500Org75,000.00112,500.00Tukang allumunium1.500Org100,000.00150,000.00Kep. Tukang0.150Org90,000.0013,500.00Mandor0.600Org110,000.0066,000.00Sub - Upah342,000.00Rp239,400.00Total harga / M2Rp734,825.004.10.PEK. CURTAINWALL KACA / M2(Diambil sample 20x20 m = 400 m2)Bahan :Curtainwall Transom Hitam (horizontal)280.00m'157,500.0044,100,000.00Curtainwall Mulion Hitam (vertical)240.00m'189,000.0045,360,000.00Frame Allumunium Casement Jendelam'105,000.000.00Kaca Stopsol 8mm400.00m'708,750.00283,500,000.00Sealant520.00m'8,531.254,436,250.00Nilai harga untuk seluas 400m2377,396,250.00Rp377,396,250.00Total harga / M2Rp943,490.63V.PEKERJAAN BAJA1MEMASANG BESI PROFIL / KGSNI-2008Bahan :Besi profil (besi siku)1.150kg14,455.3516,623.65Sub - Bahan16,623.65Rp16,623.65Upah :Pekerja0.060Org75,000.004,500.0050%Tukang Las konstruksi0.060Org100,000.006,000.00Kepala tukang0.006Org90,000.00540.00Mandor0.003Org110,000.00330.00Sub - Upah11,370.00Rp5,685.00T O T A LRp22,308.652MEMASANG BESI BAJA IWF / KGSNI-2008Bahan :Besi baja IWF1.150kg13,125.0015,093.75Sub - Bahan15,093.75Rp15,093.75Upah :Pekerja0.060Org75,000.004,500.0050%Tukang Las konstruksi0.060Org100,000.006,000.00Kepala tukang0.006Org90,000.00540.00Mandor0.003Org110,000.00330.00Sub - Upah11,370.00Rp5,685.00T O T A LRp20,778.753MENGERJAKAN 100 KG PEK. PERAKITANSNI-2008Bahan :Solar1.000liter4,500.004,500.00Minyak pelumas0.100liter35,000.003,500.00Sub - Bahan8,000.00Rp8,000.00Upah :Pekerja0.100Org75,000.007,500.00Tukang besi konstruksi0.100Org85,000.008,500.00Kepala tukang0.001Org90,000.0090.00Mandor0.005Org110,000.00550.00Sub - Upah16,640.00Rp16,640.00Sewa Alat0.800jam50,000.0040,000.00Rp40,000.00T O T A LRp64,640.00Biaya untuk perakitan / kgRp646.404PEK. PINTU BESI DOUBLE PLAT 2MM, RANGKA SIKU / M2SNI-2008Bahan :Besi siku 30x30x3mm15.000kg14,455.35216,830.25Besi plat baja32.800kg15,750.00516,600.00Kawat Las0.050kg31,500.001,575.00Sub - Bahan735,005.25Rp735,005.25Upah :Pekerja1.050Org75,000.0078,750.00Tukang Las konstruksi1.050Org100,000.00105,000.00Kepala tukang0.105Org90,000.009,450.00Mandor0.052Org110,000.005,720.00Sub - Upah198,920.00Rp198,920.00T O T A LRp933,925.255PEK. PENGELASAN 10 CM, dengan Las listrikSNI-2008Bahan :Kawat las listrik0.400kg31,500.0012,600.00Solar0.300liter4,500.001,350.00Minyak pelumas0.040liter35,000.001,400.00Sub - Bahan15,350.00Rp15,350.00Upah :Pekerja0.040Org75,000.003,000.00Tukang Las konstruksi0.020Org100,000.002,000.00Kepala tukang0.002Org90,000.00180.00Mandor0.002Org110,000.00220.00Sub - Upah5,400.00Rp5,400.00Sewa Alat0.170jam50,000.008,500.00Rp8,500.00T O T A LRp29,250.00Biaya untuk 1m pengelasanRp292,500.006MEMASANG PINTU ROLLING DOOR BESI / M2SNI-2008Bahan :Pintu gulung besi1.000M2450,000.00450,000.00Sub - Bahan450,000.00Rp450,000.00Upah :Pekerja1.200Org75,000.0090,000.00Tukang Las konstruksi1.200Org100,000.00120,000.00Kepala tukang0.120Org90,000.0010,800.00Mandor0.006Org110,000.00660.00Sub - Upah221,460.00Rp221,460.00T O T A LRp671,460.007MEMASANG SUNSCREEN ALLUMUNIUM / M2SNI-2008Bahan :Sunscreen allumunium1.000M2300,000.00300,000.00Sub - Bahan300,000.00Rp300,000.00Upah :Pekerja0.080Org75,000.006,000.00Tukang Allumunium0.800Org100,000.0080,000.00Kepala tukang0.080Org90,000.007,200.00Mandor0.004Org110,000.00440.00Sub - Upah93,640.00Rp93,640.00T O T A LRp393,640.008MEMASANG ROLLING ALLUMUNIUM / M2SNI-2008Bahan :Rolling Door Allumunium1.000M2550,000.00550,000.00Sub - Bahan550,000.00Rp550,000.00Upah :Pekerja1.000Org75,000.0075,000.00Tukang Allumunium1.000Org100,000.00100,000.00Kepala tukang0.100Org90,000.009,000.00Mandor0.050Org110,000.005,500.00Sub - Upah189,500.00Rp189,500.00T O T A LRp739,500.009Pekerjaan Railling Besi (black steel) Teras/Balkon /M'(modul 4,2 m / unit)- Railling besi bahan pipa besi hitam dia. 2" (hand rail)m'4.20m'$142,967600,460.00- Railling besi bahan pipa besi hitam dia. 1,5" (tiang)m'6.60m'$112,800744,480.00- Railling besi bahan pipa besi hitam dia. 1" (pembagi)m'16.80m'$65,9671,108,240.00- Base plate + baut angkurbh6.00bh40,000.00240,000.00- Finishing pengecatanlot1.00lot245,318.00245,318.00- Upah pasanglot1.00lot734,624.50734,624.50Total harga / unit3,673,122.50Harga / m'874,552.9810Pekerjaan Railling Besi (Black steel) Tangga /M'(modul 3,50 m'/ unit)- Railling besi bahan pipa besi hitam dia. 2" (hand rail)3.50m'$142,967500,383.33- Railling besi bahan pipa besi hitam dia. 1,5" (tiang)4.40m'$112,800496,320.00- Railling besi bahan pipa besi hitam dia. 1" (pembagi)14.00m'$65,967923,533.33- Base plate + baut angkur4.00bh40,00