91
file:///home/website/convert/temp/convert_html/55cf9cdc550346d033ab5309/document.xls DAFTAR HARGA SATUAN UPAH DINAS PEKERJAAN UMUM KABUPATEN REMBANG TAHUN 2013 EDISI JANUARI 2013 JENIS PEKERJAAN SATUAN HARGA SATUAN KETERANGAN (Rp) 1 P e k e r j a Org 36,000.00 2 Penjaga Org 36,000.00 3 T u k a n g Org 51,000.00 4 T u k a n g B a t u Org 51,000.00 5 T u k a n g B e s i Org 51,000.00 6 T u k a n g C a t Org 51,000.00 7 T u k a n g G a l i Org 48,000.00 8 T u k a n g K a y u Org 51,000.00 9 T u k a n g L e i d e n g Org 51,000.00 10 T u k a n g P l i t u r Org 48,000.00 11 S o p i r Org 48,000.00 12 M e k a n i k Org 45,000.00 13 Operator terlatih Org 51,000.00 14 P e m b . Sopir Org 36,000.00 15 Pembantu Mekanik Org 45,000.00 16 Pembantu Operator Org 42,000.00 17 Kepala Tukang Org 51,000.00 18 Kepala Tukang Batu Org 54,000.00 19 K e p . T u k a n g Besi Org 54,000.00 20 K e p . T u k a n g Cat Org 54,000.00 21 Kepala Tukang Gali Org 54,000.00 22 K e p . T u k a n g Kayu Org 54,000.00 23 Kepala Tukang Ledeng Org 54,000.00 24 Kepala Tukang Plitur Org 54,000.00 25 Mandor Lapangan Org 48,000.00 Rembang, Januari 2013 KEPALA DINAS PEKERJAAN UMUM KABUPATEN REMBANG Ir. MUJOKO, MT. NIP. 010 234 645 / 19620715 199011 1 002 NO.

Upload: eyrha-zara

Post on 03-Jan-2016

242 views

Category:

Documents


6 download

DESCRIPTION

analisa rencana anggaran biaya 2013

TRANSCRIPT

Page 1: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls

DAFTAR HARGA SATUAN UPAH DINAS PEKERJAAN UMUM KABUPATEN REMBANG

TAHUN 2013

EDISI JANUARI 2013

NO. JENIS PEKERJAAN SATUAN HARGA SATUAN

KETERANGAN (Rp)

1 P e k e r j a Org 36,000.00

2 Penjaga Org 36,000.00

3 T u k a n g Org 51,000.00

4 T u k a n g B a t u Org 51,000.00

5 T u k a n g B e s i Org 51,000.00

6 T u k a n g C a t Org 51,000.00

7 T u k a n g G a l i Org 48,000.00

8 T u k a n g K a y u Org 51,000.00

9 T u k a n g L e i d e n g Org 51,000.00

10 T u k a n g P l i t u r Org 48,000.00

11 S o p i r Org 48,000.00

12 M e k a n i k Org 45,000.00

13 Operator terlatih Org 51,000.00

14 P e m b . Sopir Org 36,000.00

15 Pembantu Mekanik Org 45,000.00

16 Pembantu Operator Org 42,000.00

17 Kepala Tukang Org 51,000.00

18 Kepala Tukang Batu Org 54,000.00

19 K e p . T u k a n g Besi Org 54,000.00

20 K e p . T u k a n g Cat Org 54,000.00

21 Kepala Tukang Gali Org 54,000.00

22 K e p . T u k a n g Kayu Org 54,000.00

23 Kepala Tukang Ledeng Org 54,000.00

24 Kepala Tukang Plitur Org 54,000.00

25 Mandor Lapangan Org 48,000.00

Rembang, Januari 2013

KEPALA DINAS PEKERJAAN UMUMKABUPATEN REMBANG

Ir. MUJOKO, MT.NIP. 010 234 645 / 19620715 199011 1 002

Page 2: Analisa Rab 2013

document.xls

DAFTAR HARGA SATUAN BAHAN DINAS PEKERJAAN UMUM KABUPATEN REMBANG

TAHUN 2013 EDISI JANUARI 2013

NO. J E N I S B A H A N SATUAN KET.

1 2 3 4.00 5

I B A H A N D A S A R 1 BATU KALI

1 Batu Alam m2 99,000.00 2 Batu Apung kg 20,200.00 3 Batu Belah m3 125,000.00 4 Batu Kali Bulat m3 138,700.00 5 Batu Grosok (pudel) m3 140,000.00 6 Batu Pecah 0,5/1 m3 287,000.00 7 Batu Pecah 1/1 m3 262,000.00 8 Batu Pecah 1/2 m3 274,000.00 9 Batu Pecah 2/3 m3 272,000.00 10 Batu Pecah 3/5 m3 229,000.00 11 Batu Pecah 5/7 m3 152,000.00 12 Batu Tempel m2 101,000.00 13 Batu Bolder m3 238,000.00

2 KERIKIL 1 Kerikil Biasa m3 31,000.00 2 Kerikil Sawur/Koral m3 30,000.00

3 BATU BATA 1 Bata Merah Lokal bh 500.00 2 Batako Besar (10/20/40) bh 4,300.00 3 Batako Kecil (7/11/25) bh 1,200.00 4 Batako Sedang (12/15/30) bh 3,300.00

4 PASIR 1 Pasir Beton (Cepu) m3 250,000.00 2 Pasir Beton (Muntilan) m3 355,000.00 3 Pasir Kwarsa m3 134,000.00 4 Pasir Pasang (Cepu) m3 230,000.00 5 Pasir Urug (Timbunan ) m3 68,000.00 6 Sirtu (tidak di ayak) m3 117,000.00 7 Sirtu Royalty m3 50,000.00 8 Abu Batu m3 129,000.00 9 Abu Batu (Tayu) m3 232,000.00

5 TANAH 1 Tanah Biasa m3 55,000.00 2 Tanah Liat m3 61,000.00 3 Tanah Padas m3 37,000.00 4 Timbunan Pilihan (tanah pilihan) m3 76,000.00

6 KAPUR 1 Kapur Labor kg 3,000.00 2 Kapur Pasang (Padam) m3 215,600.00

7 PORTLAND CEMENT 1 Portland Cement/PC kg 1,750.00 2 Portland Cement/PC(40 kg) zak 70,000.00 3 Portland Cement/PC(50kg) zak 87,500.00 4 Portland Cement/PC Curah kg 1,275.00 5 Portland Pozzolan Cement/PPC kg 1,550.00 6 Portland Pozzolan Cement/PPC-Warna kg 2,350.00 7 Portland Pozzolan Cement/PPC ( 40kg) zak 62,000.00 8 Portland Pozzolan Cement/PPC(50kg) zak 77,500.00 9 Portland Pozzolan Cement/PPC (50kg)-warna zak 117,500.00

7 BETON 1 Adukan Beton K125 ready mix m3 912,500.00 2 Adukan Beton K175 ready mix m3 975,000.00 3 Adukan Beton K200 ready mix m3 1,006,250.00 4 Adukan Beton K225 ready mix m3 1,037,500.00 5 Adukan Beton K250 ready mix m3 1,062,500.00 6 Adukan Beton K300 ready mix m3 1,125,000.00 7 Adukan Beton K325 ready mix m3 1,162,500.00

7 TRAS (TANAH KAPUR) 1 Tras m3 140,000.00

II B A H A N P E N U T U P A T A P

1 SIRAP 1 Sirap bh 6,900.00 2 Sirap( 100 lbr ) pak 285,000.00

2 GENTENG BETON 1 Genteng Beton Warna (standard) bh 3,000.00 2 Genteng Beton bh 4,800.00 3 Genteng Kerpus Beton bh 10,000.00 4 Genteng Kerpus Beton Warna (standard) bh 10,000.00

3 GENTENG TANAH LIAT

HARGA SATUAN

Page 3: Analisa Rab 2013

document.xls

NO. J E N I S B A H A N SATUAN KET.

1 2 3 4.00 5

HARGA SATUAN

1 Genteng biasa bh 1,300.00 2 Genteng Jatiwangi bh 4,200.00 3 Genteng Keramik bh 12,200.00 4 Genteng Mantili Besar bh 1,500.00 5 Geneteng Mantili Kecil bh 1,300.00 6 Genteng Pres bh 1,100.00 7 Genteng Kerpus Jatiwangi bh 11,600.00 8 Genteng Kerpus Keramik bh 21,300.00 9 Genteng Kerpus Lokal bh 3,500.00 10 Genteng Kerpus Mantili bh 3,500.00

5 ASBES GELOMBANG 1 Asbes gelombang ( 80 x 210 ) cm bh 50,000.00 2 Asbes gelombang besar 5 mm ( 120 x 240 ) cm lbr 117,000.00 3 Asbes gelombang besar 5 mm ( 90 x 180 ) cm lbr 97,000.00 4 Asbes gelombang Kecil 5 mm ( 120 x 240 ) cm lbr 89,000.00 5 Asbes gelombang Kecil 5 mm ( 90 x 180 ) cm lbr 59,000.00 6 Asbes gelombang ( 80 x 180 ) cm lbr 53,000.00 7 Asbes gelombang ( 80 x 240 ) cm lbr 68,000.00

Page 4: Analisa Rab 2013

document.xls

NO. J E N I S B A H A N SATUAN KET.

1 2 3 4.00 5

HARGA SATUAN

6 ASBES PLAT 1 Asbes Plat 100cm X 100 cm X 5 mm bh 21,000.00 2 Asbes Plat 100cm X 200 cm X 5 mm bh 58,000.00

3 Asbes Plat 100cm X 240 cm X 5 mm bh 75,000.00 4 Sekrup asbes bh 1,600.00

7 SENG PLAT 1 Seng Plat BJLS 0,30 panjang 180 cm m' 60,300.00 2 Seng Plat BJLS 0,30 panjang 240 cm m' 78,300.00 3 Seng Plat BWG 0, 28 x 80 m' 46,300.00 4 Seng Plat BWG 28 x 90 m' 51,900.00

8 SENG GELOMBANG 1 Seng gel. Kecil 0,70 x 1,80 m lbr 59,000.00 2 Seng gel. Kecil 0,70 x 2,10 m lbr 69,000.00 3 Seng gel. BJLS 0,28 panjang 180 cm lbr 60,000.00 4 Seng gel. BJLS 0,30 panjang 180 cm lbr 60,300.00 5 Seng gel. BJLS 0,28 panjang 240 cm lbr 75,000.00

9 SENG TALANG1 Seng talang BJLS 26 lebar 0,60 m' 25,800.00 2 Seng talang BJLS 26 lebar 0,90 m' 36,800.00 3 Seng talang BJLS 26 lebar 1,20 m' 55,900.00

III . B A H A N K A Y U 1 JATI

1 Kayu jati (balok/pesagen) m3 16,844,000.00 2 Kayu jati (papan) m3 16,844,000.00 3 Usuk kayu jati (3x5x400) btg 101,000.00 4 Usuk kayu jati (4x6x400) btg 162,000.00 5 Usuk kayu jati (5x7x400) btg 236,000.00 6 Reng kayu jati (2x3x400) pak 1,010,000.00 7 Reng kayu jati (2x4x400) pak 1,347,500.00

2 BENGKIRAI 1 Kayu bengkirai (balok/pesagen) m3 11,250,000.00 2 Kayu bengkirai (papan) m3 11,250,000.00 3 Usuk kayu bengkirai (3x5x400) btg 68,000.00 4 Usuk kayu bengkirai (4x6x400) btg 108,000.00 5 Usuk kayu bengkirai (5x7x400) btg 158,000.00 6 Reng kayu bengkirai (2x3x400) pak 675,000.00 7 Reng kayu bengkirai (2x4x400) pak 900,000.00

3 MERANTI 1 Kayu meranti (balok/pesagen) m3 3,609,000.00 2 Kayu meranti (papan) m3 3,609,000.00 3 Usuk kayu meranti (3x5x400) btg 22,000.00 4 Usuk kayu meranti (4x6x400) btg 35,000.00 5 Usuk kayu meranti (5x7x400) btg 51,000.00 6 Reng kayu meranti (3x5x400) pak 217,500.00 7 Reng kayu meranti (3x5x400) pak 287,500.00

4 KAMPER 1 Kayu Kamper (balok /pesagen) m3 9,769,000.00 2 Kayu kamper (papan) m3 9,769,000.00 3 Usuk kayu kamper (3x5x400) btg 59,000.00 4 Usuk kayu kamper (4x6x400) btg 94,000.00 5 Usuk kayu kamper (5x7x400) btg 137,000.00 6 Reng kayu kamper (2x3x400) pak 585,000.00 7 Reng kayu kamper (2x4x400) pak 782,500.00

5 KRUING 1 Kayu Kruing (balok /pesagen) m3 8,000,000.00 2 Kayu Kruing (papan) m3 8,800,000.00 3 Usuk kayu Kruing (3x5x400) btg 48,000.00 4 Usuk kayu Kruing (4x6x400) btg 77,000.00 5 Usuk kayu Kruing (5x7x400) btg 112,000.00 6 Reng kayu Kruing (2x3x400) pak 480,000.00 7 Reng kayu Kruing (2x4x400) pak 640,000.00

6 MERBAU 1 Kayu Merbau (balok /pesagen) m3 11,000,000.00 2 Kayu Merbau (papan) m3 11,000,000.00 3 Usuk kayu Merbau (3x5x400) btg 66,000.00 4 Usuk kayu Merbau (4x6x400) btg 106,000.00 5 Usuk kayu Merbau (5x7x400) btg 154,000.00 6 Reng kayu Merbau (2x3x400) pak 660,000.00 7 Reng kayu Merbau (2x4x400) pak 880,000.00

7 LANAN 1 Kayu Lanan (balok /pesagen) m3 3,609,000.00 2 Kayu Lanan (papan) m3 3,609,000.00 3 Usuk kayu Lanan (3x5x400) btg 22,000.00 4 Usuk kayu Lanan (4x6x400) btg 35,000.00 5 Usuk kayu Lanan (5x7x400) btg 51,000.00 6 Reng kayu Lanan (2x3x400) pak 217,500.00

Page 5: Analisa Rab 2013

document.xls

NO. J E N I S B A H A N SATUAN KET.

1 2 3 4.00 5

HARGA SATUAN

7 Reng kayu Lanan (2x4x400) pak 287,500.00 8 MAHONI

1 Kayu Mahoni (balok /pesagen) m3 3,988,000.00 2 Kayu Mahoni (papan) m3 3,988,000.00 3 Usuk kayu Mahoni (3x5x400) btg 24,000.00 4 Usuk kayu Mahoni (4x6x400) btg 38,000.00 5 Usuk kayu Mahoni (5x7x400) btg 56,000.00 6 Reng kayu Mahoni (2x3x400) pak 240,000.00 7 Reng kayu Mahoni (2x4x400) pak 320,000.00

9 ANGSANA 1 Kayu Angsana (balok /pesagen) m3 2,475,000.00 2 Kayu Angsana (papan) m3 2,475,000.00 3 Usuk kayu Angsana (3x5x400) btg 15,000.00 4 Usuk kayu Angsana(4x6x400) btg 24,000.00 5 Usuk kayu Angsana (5x7x400) btg 35,000.00 6 Reng kayu Angsana (2x3x400) pak 147,500.00 7 Reng kayu Angsana (2x4x400) pak 197,500.00

10 DOLKEN 1 btg 39,000.00 2 Kayu perancah m3 2,269,000.00

11 LAIN-LAIN 1 Kayu randu (papan ) m3 663,000.00 2 Kayu hutan lokal (Keras) m3 5,340,000.00 3 Kayu hutan lokal (Menengah) m3 2,850,000.00 4 Bambu diameter 6-8/600 cm btg 18,800.00 5 Bambu Apus btg 4,600.00 6 Glugu m' 226,900.00 7 Lis kayu 2/3 m' 7,200.00 8 List Kayu Profil m' 8,400.00

IV . BAHAN PENUTUP DINDING / LANTAI 1 UBIN (TEGEL BIASA)

1 Tegel polos 20 X 20 cm m2 26,000.00 2 Tegel polos 30 X 30 cm m2 34,000.00 3 Tegel warna 20 X 20 cm m2 32,000.00

2 KERAMIK 1 Keramik 10 x 20 cm m2 48,000.00 2 Keramik 20 x 20 cm m2 53,000.00 3 Keramik 20 x 25 cm m2 58,000.00 4 Keramik putih (KW-1) 30x30 cm m2 50,000.00 5 Keramik putih (KW-2) 30x30 cm m2 47,000.00 6 Keramik warna (KW-1) 30x30 cm m2 56,000.00 7 Keramik putih (KW-2) 30x30 cm m2 52,500.00

3 MARMER1 Marmer Itali m2 1,519,000.00 2 Marmer Kalimantan m2 1,121,000.00 3 Marmer Tulung Agung m2 668,000.00

Kayu dolken sengon Ø 8 - 10 cm, 4 M

Page 6: Analisa Rab 2013

document.xls

NO. J E N I S B A H A N SATUAN KET.

1 2 3 4.00 5

HARGA SATUAN

4 GRANITO1 Granito 40 x 40 polished (import) m2 556,000.00 2 Granito 40 x 40 polished (lokal) m2 509,000.00 3 Granito 60 x 60 polished (import) m2 529,000.00 4 Granito 60 x 60 polished (lokal) m2 507,000.00

5 GRANIT1 Granit import m2 266,000.00 2 Granit lokal m2 144,000.00

V . B A H A N C E T A K 1

1 Buis beton Ø 100 cm - 100 cm bh 323,000.00 2 Buis beton Ø 15 cm - 100 cm bh 43,000.00 3 Buis beton Ø 20 cm - 100 cm bh 61,000.00 4 Buis beton Ø 25 cm - 100 cm bh 64,000.00 5 Buis beton Ø 30 cm - 100 cm bh 76,000.00 6 Buis beton Ø 40 cm - 100 cm bh 97,000.00 7 Buis beton Ø 50 cm - 100 cm bh 119,000.00 8 Buis beton Ø 60 cm - 100 cm bh 141,000.00 9 Buis beton Ø 80 cm - 100 cm bh 215,000.00

10 Buis betonU 15 cm - 100 cm bh 59,000.00 11 Buis beton U 20 cm - 100 cm bh 47,000.00 12 Buis beton U 30 cm - 100 cm bh 57,000.00

VI . B A H A N B E S I 1 BESI BETON

1 Besi beton polos kg 12,200.00 2 Besi beton prestress kg 20,400.00 3 Besi beton ulir kg 16,700.00

2 BESI PLAT1 Besi Strip kg 17,800.00

3 BAJA1 Baja profil "IWF" kg 21,300.00 2 Baja profil " L" dan "C" kg 20,400.00

4 KAWAT1 Kawat bronjong kg 20,400.00 2 Kawat Ikat beton/bendrat kg 20,000.00 3 Kawat las listrik kg 36,300.00

VII . B A H A N P I P A 1 Pipa PVC SII SCJ , S - 12,5 (10 bar)

1 Pipa PVC. S. 12,5 ø 1/2" m' 5,000.00 2 Pipa PVC. S. 12,5 ø 3/4" m' 7,800.00 3 Pipa PVC. S. 12,5 ø 1" m' 12,400.00 4 Pipa PVC. S. 12,5 ø 1-1/4" m' 16,100.00 5 Pipa PVC. S. 12,5 ø 1-1/2" m' 25,100.00 6 Pipa PVC. S. 12,5 ø 2" m' 37,500.00 7 Pipa PVC. S. 12,5 ø 2-1/2" m' 54,700.00 8 Pipa PVC. S. 12,5 ø 3" m' 79,900.00 9 Pipa PVC. S. 12,5 ø 4" m' 116,100.00

10 Pipa PVC. S. 12,5 ø 5" m' 192,600.00 11 Pipa PVC. S. 12,5 ø 6" m' 250,400.00 12 Pipa PVC. S. 12,5 ø 8" m' 390,200.00 13 Pipa PVC. S. 12,5 ø 10" m' 613,100.00 14 Pipa PVC. S. 12,5 ø 12" m' 963,300.00 15 Pipa PVC. S. 12,5 ø 16" m' 1,665,000.00

2 Pipa PVC AW 1 Pipa PVC. AW ø 1/2" m' 6,400.00 2 Pipa PVC. AW ø 3/4" m' 7,600.00 3 Pipa PVC. AW ø 1" m' 9,500.00 4 Pipa PVC. AW ø 1 1/4" m' 16,100.00 5 Pipa PVC. AW ø 1 1/2" m' 17,600.00 6 Pipa PVC. AW ø 2" m' 25,900.00 7 Pipa PVC. AW ø 2 1/2" m' 33,000.00 8 Pipa PVC. AW ø 3" m' 47,900.00 9 Pipa PVC. AW ø 4" m' 71,500.00

3 PIPA MEDIUM B Galvanis -SII 1 Pipa Galvanis ( 1" ) m' 131,200.00 2 Pipa Galvanis ( 1 1/2" ) m' 178,300.00 3 Pipa Galvanis ( 2" ) m' 334,100.00

VIII . B A H A N L A N G I T - L A N G I T 1 PLY WOOD

1 Teak wood 120 x 240 tb. 4mm lbr 108,000.00 2 Tripleks 120 X 240 tb 3 mm lbr 61,000.00

BUIS BETON O dan U

Page 7: Analisa Rab 2013

document.xls

NO. J E N I S B A H A N SATUAN KET.

1 2 3 4.00 5

HARGA SATUAN

3 Tripleks 120 X 240 tb 4 mm lbr 80,000.00 4 Tripleks 120 X 240 tb 6 mm lbr 101,000.00 5 Multipleks 120 X 240 tb 9 mm lbr 148,700.00 6 Multipleks 120 X 240 tb 12 mm lbr 223,100.00 7 Harpleks 30 x 200 10,000.00 8 Harpleks 40 x 200 lbr 13,000.00 9 Harpleks 50 x 200 lbr 17,000.00

Page 8: Analisa Rab 2013

document.xls

NO. J E N I S B A H A N SATUAN KET.

1 2 3 4.00 5

HARGA SATUAN

10 Harpleks 60 x 200 lbr 20,000.00 11 Harpleks 90 x 180 ( 5 mm) lbr 33,000.00 12 Harpleks 120 x 240 ( 5 mm) lbr 121,000.00 13 Gypsum 6 mm lbr 61,000.00 14 Gypsum 9 mm lbr 66,000.00 15 Gypsum 12 mm lbr 81,000.00 16 Gypsum 20 mm lbr 91,000.00 17 Eternit 4 mm ( 100 x 100) m2 28,000.00 18 Formika ukuran pintu lbr 278,000.00

IX . BOX CULVERT 1 BC 100.50.120.15 (Bottom) bh 3,240,000.00 2 BC 100.50.120.15 (Top) bh 3,240,000.00 3 BC 150.50.120.15 (Bottom) bh 4,075,000.00 4 BC 150.50.120.15 (Top) bh 4,075,000.00 5 BC 150.75.120.15 (Bottom) bh 4,860,000.00 6 BC 150.75.120.15 (Top) bh 4,860,000.00 7 BC 200.50.120.20 (Bottom) bh 6,480,000.00 8 BC 200.50.120.20 (Top) bh 6,480,000.00 9 BC 200.75.120.20 (Bottom) bh 7,560,000.00

10 BC 200.75.120.20 (Top) bh 7,560,000.00 11 BC 300.50.120.20 (Bottom) bh 8,640,000.00 12 BC 300.50.120.20 (Top) bh 8,640,000.00 13 BC 380.175.120.20(Bottom) bh 15,768,000.00 14 BC 380.175.120.20 (Top) bh 15,768,000.00 15 BC 380.175.120.25 (Bottom) bh 19,710,000.00 16 BC 380.175.120.25 (Top) bh 19,710,000.00 17 BC 400.100.120.25 (Bottom) bh 16,200,000.00 18 BC 400.100.120.25 (Top) bh 16,200,000.00 19 BC 400.175.120.25 (Bottom) bh 20,250,000.00 20 BC 400.175.120.25 (Top) bh 20,250,000.00 21 BC 400.75.120.25 (Bottom) bh 14,850,000.00 22 BC 3400.75.120.25 (Top) bh 14,850,000.00 23 BC 420.150.120.25 (Bottom) bh 19,440,000.00 24 BC 420.150.120.25 (Top) bh 19,440,000.00 25 BC 780.175.120.25Bottom) bh 30,510,000.00 26 BC 780.175.120.25 (Top) bh 30,510,000.00

X . U-GUTTER 1 U-Gutter 100.100.120 bh 4,860,000.00 2 Cover 240.120.20 bh 5,184,000.00

XI . CIRCLE CULVERT 1 bh 4,239,000.00 2 bh 6,782,000.00

XII . B A H A N F I N I S H I N G 1 KAYU

1 Menie kg 24,700.00 2 Plamur kayu kg 23,300.00 3 Cat kayu (cukup) kg 48,800.00 4 Cat kayu (baik) kg 61,700.00 5 Sirlax kg 85,600.00 6 Spiritus ltr 13,100.00 7 Dempul kg 22,400.00 8 Plinkut kg 27,700.00 9 Wood filer (INFRA) kg 38,000.00 10 Oker putih kg 27,400.00 11 Oker warna kg 27,700.00 12 Melamin kg 84,000.00 13 Kuwas 3" bh 8,400.00 14 Thinner Super daimaru liter 33,100.00 15 Thinner A liter 26,100.00 16 Cat Foxi Kg 40,200.00

2 TEMBOK 1 Kapur sirih kg 1,000.00 2 Plamur tembok kg 21,200.00 3 Cat Tembok dalam (cukup) kg 22,000.00 4 Cat Tembok dalam (baik) kg 28,300.00 5 Cat Tembok luar (cukup) kg 23,500.00 6 Cat Tembok luar (baik) kg 28,300.00 7 Roll cat bh 20,500.00

3 BESI 1 Cat besi (baik) kg 59,400.00 2 Cat besi (cukup) kg 55,300.00 3 Minyak cat ltr 17,700.00 4 Amplas / Ambril lbr 3,900.00 5 Amplas Besi buah 6,800.00

1. CC Ø 50.2502. CC Ø 80.250

Page 9: Analisa Rab 2013

document.xls

NO. J E N I S B A H A N SATUAN KET.

1 2 3 4.00 5

HARGA SATUAN

6 Ampelas Dico no.120 buah 4,100.00 7 Ampelas Dico no.280 buah 4,100.00 8 Amplas Norton No 3 buah 7,400.00

XIII . B A H A N K A C A 1 Kaca Bening 5 mm m2 106,000.00 2 Kaca Rayband 5mm m2 117,000.00

XIV . BAHAN INSTALASI LISTRIK 1 Stop Kontak bh 8,700.00

XV . ALAT - ALAT PENGUNCI & PENGGANTUNG 1 KUNCI TANAM

1 Kunci tanam besar bh 170,000.00 2 Kunci tanam kecil bh 73,500.00 3 Kunci Almari bh 16,500.00 4 Kunci Sloot bh 55,000.00

2 ENGSEL DAN GERENDEL 1 Engsel H bh 6,500.00 2 Engsel Nylon bh 8,000.00 3 Grendel bh 11,500.00 4 Hak Angin bh 21,000.00

XVI . BAHAN SANITAIR

1 Kloset duduk porselin bh 643,000.00 2 Kloset jongkok porselin bh 136,000.00 3 Westafel Counter Top bh 552,000.00 4 Bak Cuci Stainlist bh 287,000.00

Page 10: Analisa Rab 2013

document.xls

NO. J E N I S B A H A N SATUAN KET.

1 2 3 4.00 5

HARGA SATUAN

XVII . ALAT PENGIKAT KAYU 1 Paku - ukuran 1" s/d 4" kg 17,500.00 2 Paku - ukuran 1/4" s/d 1" kg 18,500.00 3 Paku - payung kg 28,600.00 4 Paku - sekrup kg 25,100.00 5 Mur Baut 3/8 " buah 5,400.00 6 Lem kayu (fox) bh 20,100.00 7 Tali Ijuk kg 15,100.00 8 Lem kuning (aica aibon) kg 58,400.00

XVIII . POMPA AIR DAN TANGKI AIR 1 Mesin pompa 1 lt / dt buah 2,916,000.00 2 Mesin pompa 1-1/2 lt / dt buah 5,103,000.00

3 Tangki air fiber glass 3.000 lt 5mm buah 7,477,000.00

XIX . PAVING BLOCK 1 Paving Blok Hexagonal Kecil t: 6 cm, K300 (ALDAS) m2 97,500.00 2 Paving Blok Hexagonal Kecil t: 6 cm, K400 (ALDAS) m2 100,500.00 3 Paving Blok Hexagonal Kecil t: 8 cm, K300 (ALDAS) m2 133,000.00 4 Paving Blok Hexagonal Kecil t: 8 cm, K400 (ALDAS) m2 143,000.00 5 Paving Blok Hexagonal Kecil t: 8 cm, K500 (ALDAS) m2 153,000.00 6 Paving Block Holland t=6 cm K175 (lokal) m2 62,500.00 7 Paving Block Holland t=6 cm K200 (lokal) m2 75,000.00 8 Paving Block Holland t=6 cm K225 (lokal) m2 87,500.00 9 Paving Block Holland t=6 cm K250 (lokal) m2 96,875.00

10 Paving Block Holland t=6 cm K300 (aldas) m2 97,500.00 11 Paving Block Holland t=6 cm K300 (lokal) m2 109,375.00 12 Paving Block Holland t=6 cm K400 (ALDAS) m2 100,500.00 13 Paving Block Holland t=8 cm K175 (lokal) m2 75,000.00 14 Paving Block Holland t=8 cm K200 (lokal) m2 90,000.00 15 Paving Block Holland t=8 cm K225 (lokal) m2 105,000.00 16 Paving Block Holland t=8 cm K250 (lokal) m2 116,250.00 17 Paving Block Holland t=8 cm K300 (aldas) m2 133,000.00 18 Paving Block Holland t=8 cm K300 (lokal) m2 131,250.00 19 Paving Block Holland t=8 cm K400 (ALDAS) m2 143,000.00 20 Paving Block Holland t=8 cm K500 (ALDAS) m2 153,000.00 21 Paving Block Warna 6 cm K175 (lokal) m2 65,000.00 22 Paving Block Warna 8 cm K175 (lokal) m2 77,500.00 23 Kanstin 10x 20 x 50 (ALDAS) bh 12,000.00 24 Kanstin 10/12,5X 25 x 50 (ALDAS) bh 20,000.00 25 Kanstin 10/12,5X 30 x 50 (ALDAS) bh 24,000.00

XX PAGAR BRC1 Pagar BRC 90 A1 lbr 534,200.00 2 Pagar BRC 90 A2 lbr 444,700.00 3 Pagar BRC 120 A1 lbr 623,200.00 4 Pagar BRC 120 A2 lbr 534,200.00 5 Pagar BRC 150 A1 lbr 979,500.00 6 Pagar BRC 150 A2 lbr 890,000.00 7 Pipa Tiang BRC 90-2" unit 213,000.00 8 Pipa Tiang BRC 120-2" unit 247,000.00 9 Pipa Tiang BRC 150-2" unit 264,000.00

XXI. FOLDING GATE 1 Folding Gate tb : 0,4 mm m2 475,000.00 2 Folding Gate tb : 0,5 mm m2 515,000.00 3 Folding Gate tb : 0,8 mm m2 550,000.00

XXII. ROLLING DOOR 1 Rolling door (Alumunium ) tb : 0,5 mm m2 345,000.00 2 Rolling door (Alumunium ) tb : 0,8 mm m2 375,000.00 3 Rolling door (Besi ) tb : 0,8 mm m2 275,000.00

XX . L A I N - L A I N 1 Alat bantu (set@ 3 alat ) lot 15,100.00 2 Aspal bitumen kg 12,000.00 3 Minyak aspal ltr 2,400.00 4 Bensin / premium ltr 4,500.00 5 Solar (minyak diesel) liter 4,500.00 6 Minyak tanah ltr 10,000.00 7 Olie (minyak pelumas) liter 22,000.00 8 Stempet Kg 22,100.00 9 Gebalan rumput m2 15,100.00 10 Wiremesh MS m2 80,000.00 11 Kayu bakar m3 107,000.00 12 Pintu Ronsel Doble 150 x 150 x 300 buah 41,250,000.00 13 Pintu Ronsel Doble 200 x 200 x 300 buah 45,375,000.00 14 Pintu Ronsel Engkel 100 x 100 x 300 buah 18,906,000.00 15 Pintu Intake 30 x 40 x 300 buah 4,538,000.00

Page 11: Analisa Rab 2013

document.xls

NO. J E N I S B A H A N SATUAN KET.

1 2 3 4.00 5

HARGA SATUAN

16 Pintu Intake 40 x 40 x 300 buah 4,916,000.00 17 Pintu Intake 50 x 50 x 300 buah 5,294,000.00 18 Pintu Intake 60 x 60 x 300 buah 6,806,000.00 19 Pintu Intake 80 x 80 x 300 buah 7,563,000.00 20 Pintu Intake 90 x 100 x 300 buah 8,319,000.00 21 Pintu Intake 100 x 100 x 300 buah 10,588,000.00 22 Nomenklatur Marmer ( 15 x 30 ) buah 149,400.00 23 Nomenklatur Marmer ( 30 x 40 ) buah 598,300.00 24 Pile Scale ( 12 x 100 ) buah 374,000.00 25 Pile Scale ( 20 x 100 ) buah 598,000.00 26 Lapisan kedap air kg 64,100.00 27 Peralatan hr 3,600.00 28 Jendela nako lengkap /lb 60,000.00 29 Minyak Beton & bekisting ltr 24,200.00 30 Alumunium sheet 0,3 mm ( 90 x 180 ) 144,000.00 31 Shear Connector 12,100.00 32 Pemeliharaan Alat (Walls) 50,000.00 33 Peralatan (oksigen,solar,elpiji,kawat las ) 165,000.00 34 Sewa Alat 100,000.00 35 Sewa Alat (Crane) 700,000.00 36 Sewa Dump Truck 275,000.00 37 Sewa Excavator 0,90 m3 1,025,000.00 38 Sewa Excavator 0,90 m3 + operator 252,000.00 39 Sewa Walls 150,000.00

Rembang, Januari 2013

KEPALA DINAS PEKERJAAN UMUM KABUPATEN REMBANG

Ir. MUJOKO, MT. NIP. 010 234 645 / 19620715 199011 1 002

Page 12: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 12

D A F T A R H A R G A S A T U A N P E K E R J A A N DINAS PEKERJAAN UMUM KABUPATEN REMBANG

TAHUN 2013

HARGA SATUAN

NO. KODE URAIAN PEKERJAAN BAHAN

(Rp)

1 2 3 4

I A PEKERJAAN PERSIAPAN

A.1 1M' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m 399,054.00

A.2 1M' Pengukuran dan Pemasangan Bouwplank 157,950.00

A.3 1M2 Pembuatan Kantor Sementara dg Lantai Plesteran 1,063,685.00

A.4 1M2 Pembuatan Gudang Semen dan Alat-alat 956,765.00

A.5 1M2 Membersihkan Lapangan dan Perataan -

A.6 1M2 Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm 22,575.00

A.7 1M3 Bongkaran Beton Bertulang -

A.8 1M3 Bongkaran Dinding Tembok Bata Merah -

A.9 1 M3 MEMBONGKAR DINDING BATA / BATU (Batu / bata dipakai lagi) -

A.10 1 M3 MEMBONGKAR DINDING BATA / BATU (bongkaran tidak dipakai lagi) -

A.11 1M2 MEMBONGKAR PLESTERAN DINDING -

A.12 1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran tidak dipakai lagi) -

A.13 1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran dipakai lagi) -

A.14 1M2 MEMBONGKAR RANGKA ATAP/RENG KASO (bongkaran tidak dipakai lagi) -

A.15 1M2 MEMBONGKAR RANGKA ATAP / RENG KASO (bongkaran dipakai lagi) -

A.16 1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran dipakai lagi) -

A.17 1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran tidak dipakai lagi) -

A.18 1M2 MEMBONGKAR PLAFOND (bongkaran dipakai lagi) -

A.19 1M2 MEMBONGKAR PLAFOND (bongkaran tidak dipakai lagi) -

II B PEKERJAAN TANAH

B.1 1M3 Galian Tanah Biasa Sedalam 1 m -

B.2 1M3 Galian Tanah Keras Sedalam 1 m -

B.3 1M3 Galian Tanah Cadas Sedalam 1 m -

B.4 1M3 Galian Tanah Lumpur Sedalam 1 m -

B.5 1M2 Pekerjaan Striping Setinggi 1 m -

B.6 1M3 Membuang Tanah Sejauh 30 m' -

B.7 1M3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian) -

B.8 1M3 Pemadatan Tanah -

B.9 1M3 Urugan Pasir 81,600.00

B.9a 1M3 Urugan Tanah Biasa (Tanah Tersedia) -

B.10 1M3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL 114,134.00

B.11 1M2 Pemasangan Lapisan Ijuk tebal 10 cm 90,600.00

B.12 1M3 Urugan Sirtu 140,400.00

B.13 1 M3 Galian Tanah Biasa Sedalam 2 meter -

B.14 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 3 M' TENAGA MANUSIA -

B.15 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 4 M' TENAGA MANUSIA -

B.16 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 5 M' TENAGA MANUSIA -

B.17 1 M3 PEK. GALIAN TANAH BANYAK TERDAPAT BATU-BATU BUNDAR -

MAX KEDALAMAN 1 M' TENAGA MANUSIA

B.18 1 M3 PEK. GALIAN TANAH BERBATU MAX KEDALAMAN 1 M' TNG MANUSIA -

B.19 1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 2 M' DENGAN ALAT BERAT -

B.20 1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 5 M' DENGAN ALAT BERAT -

B.21 MENGANGKUT HASIL GALIAN DENGAN DUMP TRUCK . M3/KM. -

B.22 1 M3. MENGANGKUT HASIL GALIAN EXAVATOR MAX 1,5 KM ( DENGAN DUMP TRUCK ) -

KURANG DARI 1,5 KM.

B.23 1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK -

JARAK ANTARA 1,5 S/D 3 KM.

B.24 1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK -

JARAK ANTARA 3 S/D 5 KM.

B.25 1 M3 MERATAKAN TANAH -

B.26 1 M3 PEK. URUGAN TANAH PILIHAN 91,200.00

B.27 1 M3 PEK. LAPISAN PUDEL 1 KP : 3 TL 104,120.00

B.28 1 M3 PEK. LAPISAN PUDEL 1 KP : 5 PS 273,120.00

B.29 1 M3 MERATAKAN TANAH DAN DITIMBRIS -

B.30 1 M2 MENGAMBIL DAN PASANGAN GEBALAN -

Page 13: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 13

HARGA SATUAN

NO. KODE URAIAN PEKERJAAN BAHAN

(Rp)

1 2 3 4

B.31 1 M' MENGANGKUT GEBALAN RUMPUT -

B.32 1 M2 PEKERJAAN GEBALAN RUMPUT SAMPAI TUMBUH 18,120.00

B.33 1 M2 URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPADATKAN (U/5000 M3) -

Page 14: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 14

HARGA SATUAN

NO. KODE URAIAN PEKERJAAN BAHAN

(Rp)

1 2 3 4

III C PEKERJAAN PONDASI

C.1 1M3 Pasang Pondasi Batu Kali 1Pc : 3 Ps 574,650.00

C.1a 1 M3 PASANGAN BATU BELAH 1 : 4 509,750.00

C.2 1M3 Pasang Pondasi Batu Kali 1Pc : 5 Ps 485,920.00

C.3 1M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 Ps 389,403.20

C.4 1M3 Pasang Pondasi Batu Kosong 179,376.00

C.4a 1M3 Pasang Batu Bolder 261,800.00

C.5 1M3 Pasang Pondasi Siklop 60% Beton Camp. 1PC : 2PS : 3KR & 2,140,132.00

40% Batu Belah

C.6 1M3 Pasang Pondasi Sumuran diameter 100 cm 595,742.00

C.7 1M' Pembuatan Tiang Pancang (40x40) cm, Beton Bertulang 1,060,741.00

C.8 SEBUAH TIANG PANCANG DICINCIN DAN DILANCIPKAN (KAYU HUTAN) 39,000.00

C.9 1 M' TIANG DIPANCANGKAN DIDALAM TANAH LUNAK -

C.10 1 M' TIANG DIPANCANGKAN DIDALAM TANAH BIASA -

C.11 1 M' TIANG DIPANCANGKAN DIDALAM TANAH KERAS -

C.12 1 M' TIANG DIPANCANGKAN DIDALAM TANAH PASIR -

C.13 1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 3 MM 319,999.32

C.14 1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 4 MM 456,000.00

C.15 1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 5 MM 625,999.32

IV D P E K E R J A A N D I N D I N G

D.1 1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 2 Ps 73,112.50

D.2 1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Ps 66,473.50

D.3 1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps 56,709.00

D.4 1 M2 PASANGAN 1/2 BATA MERAH 1 : 4 62,715.00

D.5 1 M2 PASANGAN 1/2 BATA MERAH 1 : 5 60,354.00

D.6 1 M2 PASANGAN BATU TEMPEL + SIARAN 127,530.00

D.7 1 M3 PASANGAN BATA MERAH 1 PC : 2 PS 645,704.00

D.8 1 M3 PASANGAN BATA MERAH 1 PC : 4 PS 539,672.00

D.9 1 M3 PASANGAN BATA MERAH 1 PC : 3 KP : 10 PS 431,082.00

D.10 1 M3 PASANGAN DINDING BATACO TEBAL 1/2 BATA (1 PC : 3 PS) 72,444.00

D.11 1 M3 PASANGAN DINDING BATACO TEBAL 1/2 BATA (1 PC : 5 PS) 68,970.00

D.12 1 M3 PASANGAN DINDING BATACO TEBAL 1/2 BATA Dengan pasir kwarsa (1 PC : 3 PS) 69,333.60

D.13 1 M3 PASANGAN DINDING BATACO TEBAL 1/2 BATA Dengan pasir kwarsa (1 PC : 5 PS) 66,378.00

V E PEKERJAAN P L E S T E R A N

E.1 1M2 Plesteran 1 Pc : 3 Ps Tebal 15 mm 17,318.00

E.2 1M2 Plesteran 1 Pc : 2 Kp : 8 Ps Tebal 15 mm 10,328.00

E.3 1M2 Plesteran 1 Pc : 3 Kp : 10 Ps Tebal 15 mm 7,365.60

E.4 1M2 Plesteran 1 Pc : 3 Ps Tebal 20 mm 23,200.40

E.4a 1M2 Plesteran 1 Pc : 3 Ps Tebal 10 mm 12,618.62

E.5 1M2 Berapen 1 Pc : 5 Ps Tebal 15 mm 14,015.20

E.6 1M' Plesteran Skoning 1 Pc : 2 Ps lebar 10 mm 8,076.00

E.7 1M2 Plesteran Ciprat 1 Pc : 2 Ps 8,076.00

E.8 1M2 Finishing Siar Pas. Batu Kali Adukan 1 Pc : 2 Ps 12,587.00

E.9 1M2 Acian 5,037.50

VI F PEKERJAAN KAYU

F.1 1M3 Membuat Kosen Pintu & Jendela Kayu klas I 18,570,375.00

F.2 1M3 Membuat Kosen Pintu & Jendela Kayu Bengkirai 12,416,975.00

F.3 1M2 Membuat Pintu Klamp Standard Kayu Bengkirai 450,875.00

F.4 1M2 Membuat Daun Pintu Panel Kayu Bengkirai 451,005.00

F.5 1M2 Membuat Pintu & Jendela Kaca Kayu Bengkirai 399,780.00

F.6 1M2 Membuat Pintu & Jendela Jalusi Kayu Kelas I (Jati) 1,088,066.00

F.7 1M2 Membuat Pintu Plywood Rangkap rangka Kayu Bengkirai lbr s/d 90cm 399,825.00

F.8 1M2 Membuat Pintu Plywood rangkap, rangka expose kayu Bengkirai 406,575.00

F.9 1M2 Membuat Jalusi mati Kosen Kayu Kelas I (Jati) 1,013,265.00

F.10 1M2 Membuat Jalusi mati Kosen Kayu Bengkirai 677,625.00

F.11 1M2 Membuat Pintu Teakwood Rangkap Rangka Kayu Kelas I (jati) 535,655.00

F.12 1M2 Membuat Pintu Teakwood Rangkap Lapis Formika Rangka ekspose 530,383.00

Kayu Bengkirai

Page 15: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 15

HARGA SATUAN

NO. KODE URAIAN PEKERJAAN BAHAN

(Rp)

1 2 3 4

F.13 1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS ALUMINIUM ( KM/WC ) 435,300.00

F.14 1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS FORMIKA ( KM/WC ) 413,180.00

F.15 1M3 Memasang Konstruksi Kuda-kuda Konvensional Kayu Bengkirai 12,656,000.00

Bentang 6 M

Page 16: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 16

HARGA SATUAN

NO. KODE URAIAN PEKERJAAN BAHAN

(Rp)

1 2 3 4

F.16 1M3 Memasang Konstruksi Kuda-kuda Ekspose Kayu Jati 18,893,400.00

F.17 1M3 Memasang Konstruksi Gording Kayu Bengkirai 12,694,500.00

F.18 1M2 Pasang Pintu Plywood & Formika Rangka Kayu Bengkirai 559,055.00

F.19 1M2 Pasang Pintu Formika Double, Rangka Kayu Jati 740,787.40

F.20 1M2 Memasang Rangka Atap Genteng Keramik, Kayu Bengkirai 141,625.00

F.21 1M2 Memasang Rangka Atap Genteng Beton, Kayu Bengkirai 149,500.00

F.22 1M2 Pasang Rangka Atap Sirap Kayu Bengkirai 1,859,750.00

F.23 1M' Pasang Listplank Uk. (3x20)cm Kayu Bengkirai 82,750.00

F.24 1M' Pasang Listplank Uk. (3x30)cm Kayu Bengkirai 124,625.00

F.25 1M' Pasang Listplank Uk. 2x(3x20)cm Kayu Bengkirai 165,750.00

F.26 1M2 Pasang Rangka Dinding Pemisah Kayu Bengkirai 317,625.00

F.27 1M2 Pas. Dinding Pemisah Teakwood Rangkap Rangka Kayu Bengkirai 421,761.00

F.28 1M2 Pasang Dinding Lambriziring dari Papan jati 123,423.00

F.29 1M2 Pasang Plywood tebal 4mm unt Dinding 52,450.00

F.30 1M2 Pasang Dinding Bilik, Rangka Kayu Klas III / IV 79,676.20

VII G PEKERJAAN BETON

G.1 1M3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87 790,188.57

G.2 1M3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78 836,240.40

G.3 1M3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72 872,329.20

G.4 1M3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 770,406.80

G.5 1M3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 915,067.80

G.6 1M3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm,w/c = 0,61 1,010,599.30

G.7 1M3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1,038,767.40

G.8 1M3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm,w/c = 0,56 1,058,346.90

G.9 1M3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53 1,092,193.00

G.10 1M3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm,w/c = 0,52 1,102,648.20

G.11 1M3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm,w/c = 0,49 1,142,337.80

G.12 1M3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 1,156,073.80

G.13 1KG Pembesian dg Besi Polos 13,110.00

G.13a 110 KG Besi Beton Terpasang (polos)

G.13b 125 KG Besi Beton Terpasang (polos)

G.14 1KG Kabel Presstresed Polos/strand 21,620.00

G.15 1M2 Pasang Bekisting untuk Pondasi 98,430.00

G.16 1M2 Pasang Bekisting untuk Sloof 109,775.00

G.17 1M2 Pasang Bekisting untuk Kolom 286,780.00

G.18 1M2 Pasang Bekisting untuk Balok 297,607.00

G.19 1M2 Pasang Bekisting untuk Lantai 442,780.00

G.20 1M2 Pasang Bekisting untuk Dinding 321,135.00

G.21 1M2 Pasang Bekisting untuk Tangga 262,880.00

G.22 1 M2 Pasang Bekisting Jembatan Cor 89,901.60

G.23 1 M2 BEKESTING DENGAN PAPAN 122,809.00

G.24 1 M2 BEKESTING DENGAN MULTIPLEX 9 MM 119,951.90

G.25 1 M3 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting) 3,333,970.00

G.26 1 M3 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) 4,161,890.00

G.27 1 M3 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting) 7,678,540.00

G.28 1 M3 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting) 5,944,160.00

G.29 1 M3 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting) 5,762,480.00

G.30 1 M3 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting) 5,413,320.00

G.31 1 M3 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting) 5,445,225.00

G.32 1 M' Membuat Kolom Penguat Beton Bertulang (11 x 11) cm 60,479.00

G.33 1 M' Membuat Ring Balok Beton Bertulang (10 x 15) cm 66,962.00

G.34 1 M3 PAS. BETON K-175 READY MIX 6 M3 BERIKUT SLANG 975,000.00

G.35 1 M3 PAS. BETON K-225 READY MIX 6 M3 BERIKUT SLANG 1,037,500.00

G.36 1 M3 PAS. BETON K-300 READY MIX 6 M3 BERIKUT SLANG 1,125,000.00

G.37 1 KG PEK. ERECTION KONST. KUDA-KUDA BESI 207.00

G.38 1 KG PEKERJAAN BAJA IWF 42,180.00

G.39 1 KG PEKERJAAN KONSTUKSI BESI SIKU / PROFIL 43,065.00

G.40 1 CM PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL KAWAT 4 MM 26,675.00

G.41 1 TITIK MELUBANG KONSTRUKSI BESI DENGAN BOR -

G.42 1 M2 PEKERJAAN WIREMESH M8 84,430.00

Page 17: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 17

HARGA SATUAN

NO. KODE URAIAN PEKERJAAN BAHAN

(Rp)

1 2 3 4

VIII H PEKERJAAN PENUTUP ATAP

H.1 1 M2 Pasang Atap Genteng Mantili Kecil 32,500.00

H.2 1 M2 Pasang Atap Genteng Mantili Besar 30,000.00

H.3 1 M' Pasang Genteng Bubung Mantili 37,260.00

H.4 1 M2 Pasang Atap Asbes Gelombang (80 x 210 cm) x 5 mm 33,432.00

H.5 1 M2 Pasang Atap Genteng Beton 53,325.00

H.6 1 M2 Pasang Atap Sirap 417,700.00

H.7 1 M' Pasang Bubungan Beton 59,975.00

H.8 1 M' Pasang Bubungan Sirap 65,180.00

H.9 1 M2 Pasang Atap Seng Gelombang BJLS 28 42,370.00

H.10 1 M' Pasang Bubungan Seng 18,830.00

IX I PEKERJAAN LANGIT - LANGIT

I.1 1 M2 Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm 23,285.00

I.2 1 M2 Memasang Langit-langit Tripleks Uk (120x240) cm, 30,555.00

Tebal 3 mm, 4 mm & 6 mm

I.3 1 M2 Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm 252,845.00

I.4 1 M2 Langit-langit Gypsum Board, tebal 9 mm 26,785.00

I.5 1 M' List Langit-Langit Kayu Profil 9,005.00

I.6 1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu Bengkirai 176,750.00

I.6a 1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu Kruing 70,700.00

I.7 1M2 Pasang Rangka Langit-langit (60x60) cm, kayu Bengkirai 187,750.00

X J PEKERJAAN SANITASI, JALAN DAN SALURAN

J.1 1 UNIT Memasang Closet Duduk Porselin 643,000.00

J.2 1 UNIT Memasang Closet Jongkok 147,600.00

J.3 1 UNIT Memasang Wastafel 729,200.00

J.4 1 M' Memasang Pipa Beton, Ø 15 cm - 20 cm 62,879.50

J.5 1 M' Memasang Pipa Beton, Ø 30 cm - 100 cm 118,562.00

J.6 1 M' Memasang Pipa PVC type AW Ø ½" 8,704.00

J.7 1 M' MEMASANG PIPA PVC type AW Ø 3/4" 10,336.00

J.8 1 M' MEMASANG PIPA type AW PVC Ø 1" 12,920.00

J.9 1 M' MEMASANG PIPA PVC type AW Ø 11/4" 21,896.00

J.10 1 M' MEMASANG PIPA PVC type AW Ø 11/2" 23,936.00

J.11 1 M' Memasang Pipa PVC type AW Ø 2" 35,224.00

J.12 1 M' MEMASANG PIPA PVC type AW Ø 21/2" 44,880.00

J.13 1 M' Memasang Pipa PVC type AW Ø 3" 65,144.00

J.14 1 M' Pasangan Pipa PVC 1" 1,092.00

J.15 1 M' Pasangan Pipa PVC 1 1/4" 2,184.00

J.16 1 M' Pasangan Pipa PVC 1 1/2" 4,392.00

J.17 1 M' Pasangan Pipa PVC 2" 2,296.80

J.18 1 M' Pasangan Pipa PVC Ø 4" 19,996.08

J.19 1 M' Pasangan Pipa PVC Ø 6" 25,416.96

J.20 1 M2 PASANG PAVING BLOK 6 CM K : 300 121,475.00

J.21 1 M2 PASANG PAVING BLOK 6 CM K : 175 86,125.00

J.22 1 M2 PASANG PAVING BLOK 8 CM K ; 300 157,330.00

J.23 1 M2 PASANG PAVING BLOK 8 CM K: 175 98,750.00

J.24 1 M2 PASANGAN PAVING BLOK WARNA 6 CM K: 175 88,650.00

J.25 1 M2 PASANGAN PAVING BLOK WARNA 6 CM K: 250 120,843.75

J.26 1 M2 PASANGAN PAVING BLOK WARNA 8 CM K: 175 101,275.00

J.27 1 M2 LAPISAN PENGISI / PENUTUP DENGAN ASPAL PANAS TEBAL 3 CM 49,966.00

J.28 MENGGILAS JALAN 1 HARI DIPERLUKAN -

J.28a MENGGILAS 1 M2 LAPIS KULIT PENAHAN -

J.28b MENGGILAS 1 M2 LAPIS KULIT PERTEGARAN -

J.28c MENGGILAS LAPIS AUS ( PENETRASI ) -

J.28d MENGGILAS RINGAN 1 M2 OPERPENTING -

J.29 100 M2 PENGASPALAN SHEET (LATASIR) TEBAL 1 CM JERENG 1,828,300.00

J.30 1M2 ASPAL SAND SHEET TEBAL 2 CM JERENG ( 1 CM PADAT ) 48,962.00

J.31 1M2 ASPAL SAND SHEET TEBAL 3 CM JERENG ( 2 CM PADAT ) 70,443.00

J.32 1 M3 PASIR DIBAWAH ALAS JALAN TIAP 1 M3 LAPIS PASIR 81,600.00

J.33 1 M2 PAS ONDERLAG BATU BELAH TEBAL 15 CM 28,400.00

Page 18: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 18

HARGA SATUAN

NO. KODE URAIAN PEKERJAAN BAHAN

(Rp)

1 2 3 4

J.34 1 M2 PAS BATU LAPIS ATAS TEBAL 6 CM 13,520.00

J.35 1 BTG/4 M PENGADAAN DAN PEMASANGAN CERUCUK 39,000.00

J.36 1 UNIT BOX PRECAST 100 x 100 x 120 x 15 , TERPASANG 6,606,000.00

J.37 1 UNIT BOX PRECAST 150 x 100 x 120 x 15 , TERPASANG 8,276,000.00

J.38 1 UNIT BOX PRECAST 150 x 150 x 120 x 15 , TERPASANG 9,871,200.00

J.39 1 UNIT BOX PRECAST 200 x 150 x 120 x 20 , TERPASANG 15,372,000.00

J.40 1 UNIT BOX PRECAST 300 x 100 x 120 x 20 , TERPASANG 17,658,000.00

J.41 1 UNIT BOX PRECAST 380 x 350 x 120 x 20 , TERPASANG 32,166,000.00

J.42 1 UNIT BOX PRECAST 420 x 300 x 120 x 25 , TERPASANG 39,510,000.00

J.43 1 UNIT RPC 500 x 2500, TERPASANG 230,900.00

J.44 1 UNIT RPC 800 x 2500, TERPASANG 230,900.00

XI K PEKERJAAN BESI & ALLUMUNIUM

K.1 1 Kg Memasang Besi Profil 24,942.00

K.2 1 Kg Memasang Rangka Kuda-kuda Baja IWF 24,495.00

K.3 1 M' Memasang Talang Datar/Jurai , Seng BJLS 26 Lebar 90 cm 252,667.50

K.4 1 M' Memasang Talang U 15 cm, Seng Plaat BJLS 26 lebar 45 cm 36,175.00

Lebar 45 cm

Page 19: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 19

HARGA SATUAN

NO. KODE URAIAN PEKERJAAN BAHAN

(Rp)

1 2 3 4

XII L PEKERJAAN KUNCI dan KACA

L.1 1 BUAH Pasang Kunci Tanam Biasa 73,500.00

L.2 1 BUAH Pasang Kunci Tanam Kamar Mandi 73,500.00

L.3 1 BUAH Pasang Engsel Pintu 8,000.00

L.4 1 BUAH Pasang Engsel Jendela Kupu-kupu 8,000.00

L.5 1 BUAH Pasang Engsel Angin 6,500.00

L.6 1 BUAH Pasang Kait Angin 21,000.00

L.7 1 BUAH Pasang Kunci Selot 55,000.00

L.8 1 BUAH Pasang Kunci Lemari 16,500.00

L.9 1 M2 Pasang Kaca tebal 5 mm 128,700.00

XIII M PEKERJAAN PENUTUP LANTAI & DINDING

M.1 1 M2 Pasang lantai Ubin PC Abu-abu Uk. 20 x 20 cm 45,225.00

M.2 1 M2 Pasang lantai Ubin Granito Uk. 40 x 40 cm 598,675.00

M.3 1 M2 Pasang Lantai Keramik 30 x 30 cm 83,375.00

M.4 1 M2 Pasang Lantai Keramik 20 x 20 cm 83,277.00

M.5 1M2 Memasang Lantai Marmer ukuran 1.00x1.00 m 705,932.00

M.6 1 M2 Pasang Dinding Keramik 10x20 cm, 73,017.50

M.7 1 M2 Pasang Dinding Keramik 20x20 cm, 78,017.50

M.8 1M2 Memasang Dinding Marmer ukuran 1.00x1.00 m 742,919.50

M.9 1 M2 Pasang Dinding Batu Paros / Batu Tempel Hitam 137,362.50

M.10 1 M2 DINDING GRANIT IMPORT 362,470.00

M.11 1 M2 LANTAI GRANIT IMPORT 362,470.00

M.12 1 M2 LANTAI GRANITO UKURAN 60 X 60 POLISHED 622,685.00

M.13 1 M2 DINDING GRANITO UKURAN 60 X 60 POLISHED 622,685.00

M.14 1 M2 LANTAI MARMER ITALY 1,640,530.00

M.15 1 M2 DINDING MARMER ITALY 1,640,530.00

XIV N PEKERJAAN PENGECATAN

N.1 1 M2 Mendempul dan Menggosok Kayu 2,536.00

N.2 1 M2 Pengecatan Bidang Lama 22,280.00

N.3 1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir) 32,773.00

1 lap.Cat Dasar & 2 lap.Cat Penutup

N.4 1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir) 38,326.00

1 lap.Cat Dasar & 3 lap.Cat Penutup

N.5 1 M2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 11,678.00

2 lap. Cat Penutup)

N.6 1 M2 Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup) 7,294.00

N.7 1 M2 Pengecatan Permukaan Baja dg Meni Besi 3,054.00

N.8 1 M2 Pengecatan Permukaan Baja dg Meni Besi & Perancah 7,592.00

N.9 1 M2 Pengecatan Permukaan Baja lapis Seng (Galvanis) secara 20,236.00

manual sistem 3 lapis Cat Konvensional dg tebal 200 um

N.10 1 M2 PLITURAN BANGUNAN ( BIASA ) 17,843.00

N.11 1 M2 PLITURAN MEUBELAIR 60,731.00

Rembang, Januari 2013

KEPALA DINAS PEKERJAAN UMUM

KABUPATEN REMBANG

Ir. MUJOKO, MT.

NIP. 010 234 645 / 19620715 199011 1 002

B281
User:
C281
User:
F281
User:
C317
User:
F317
User:
Page 20: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 20

D A F T A R H A R G A S A T U A N P E K E R J A A N DINAS PEKERJAAN UMUM KABUPATEN REMBANG

TAHUN 2013 EDISI JANUARI 2013

HARGA SATUAN HARGA SATUAN TOTAL

UPAH ALAT HARGA SATUAN

(Rp) (Rp) (Rp)

5 6 7

26,640.00 - 425,694.00

9,480.00 - 167,430.00

243,600.00 - 1,307,285.00

151,200.00 - 1,107,965.00

6,000 - 6,000.00

17,840.40 - 40,415.00

255,996.00 - 255,996.00

241,596.00 - 241,596.00

112,320.00 - 112,320.00

81,600.00 - 81,600.00

5,100.00 - 5,100.00

4,080.00 - 4,080.00

20,400.00 - 20,400.00

10,350.00 - 10,350.00

13,800.00 - 13,800.00

501,600.00 - 501,600.00

316,200.00 - 316,200.00

21,000.00 - 21,000.00

6,120.00 - 6,120.00

16,320.00 - 16,320.00

37,536.00 - 37,536.00

56,880.00 - 56,880.00

45,360.00 - 45,360.00

2,040.00 - 2,040.00

12,360.00 - 12,360.00

5,440.00 - 5,440.00

20,400.00 - 20,400.00

11,280.00 - 92,880.00

11,280.00 - 11,280.00

55,200.00 - 169,334.00

6,120.00 - 96,720.00

10,200.00 - 150,600.00

21,432.00 - 21,432.00

29,964.00 755.00 30,719.00

38,496.00 755.00 39,251.00

47,028.00 755.00 47,783.00

56,400.00 3,775.00 60,175.00

28,500.00 3,775.00 32,275.00

703.80 8,388.61 9,092.00

846.00 10,952.90 11,798.00

968.40 4,241.95 5,210.00

1,314.00 5,764.89 7,078.00

2,197.20 9,625.89 11,823.00

3,072.00 13,458.95 16,530.00

9,480.00 1,887.50 11,367.00

11,280.00 1,510.00 103,990.00

64,680.00 - 168,800.00

64,680.00 - 337,800.00

9,480.00 1,887.50 11,367.00

6,120.00 188.75 6,308.00

Page 21: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 21

HARGA SATUAN HARGA SATUAN TOTAL

UPAH ALAT HARGA SATUAN

(Rp) (Rp) (Rp)

5 6 7

2,040.00 188.75 2,228.00

7,920.00 188.75 26,228.00

- - 94,048.00

Page 22: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 22

HARGA SATUAN HARGA SATUAN TOTAL

UPAH ALAT HARGA SATUAN

(Rp) (Rp) (Rp)

5 6 7

91,440.00 - 666,090.00

91,440.00 - 601,190.00

91,440.00 - 577,360.00

91,440.00 - 480,843.00

49,068.00 - 228,444.00

1,127.40 14,040.00 276,967.00

156,660.00 - 2,296,792.00

-

106,440.00 - 702,182.00

76,188.00 - 1,136,929.00

12,930.00 151.00 52,081.00

69,120.00 151.00 69,271.00

86,402.40 188.75 86,591.00

103,680.00 226.50 103,906.00

77,760.00 188.75 77,948.00

109,682.10 - 429,681.00

115,479.90 - 571,479.00

122,981.10 - 748,980.00

17,160.00 - 90,272.00

17,160.00 - 83,633.00

17,160.00 - 73,869.00

17,880.00 - 80,595.00

17,880.00 - 78,234.00

55,076.50 - 182,606.00

257,400.00 - 903,104.00

257,400.00 - 797,072.00

257,400.00 - 688,482.00

14,760.00 - 87,204.00

14,760.00 - 83,730.00

14,760.00 - 84,093.00

14,760.00 - 81,138.00

15,411.00 - 32,729.00

15,216.00 - 25,544.00

15,411.00 - 22,776.60

21,240.00 - 44,440.40

12,054.00 - 24,672.00

9,732.00 - 23,747.20

6,186.00 - 14,262.00

15,264.00 - 23,340.00

19,416.00 - 32,003.00

11,424.00 - 16,461.00

1,358,400.00 - 19,928,775.00

1,358,400.00 - 13,775,375.00

72,684.00 - 523,559.00

179,400.00 - 630,405.00

143,520.00 - 543,300.00

219,600.00 - 1,307,666.00

136,320.00 - 536,145.00

143,520.00 - 550,095.00

132,000.00 - 1,145,265.00

132,000.00 - 809,625.00

143,520.00 - 679,175.00

171,720.00 - 702,103.00

-

Page 23: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 23

HARGA SATUAN HARGA SATUAN TOTAL

UPAH ALAT HARGA SATUAN

(Rp) (Rp) (Rp)

5 6 7

84,744.00 - 520,044.00

91,944.00 - 505,124.00

916,800.00 - 13,572,800.00

-

Page 24: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 24

HARGA SATUAN HARGA SATUAN TOTAL

UPAH ALAT HARGA SATUAN

(Rp) (Rp) (Rp)

5 6 7

1,358,400.00 - 20,251,800.00

498,240.00 - 13,192,740.00

171,720.00 - 730,775.00

185,040.00 - 925,827.00

9,480.00 - 151,105.00

9,480.00 - 158,980.00

11,376.00 - 1,871,126.00

15,390.00 - 98,140.00

15,120.00 - 139,745.00

19,860.00 - 185,610.00

34,620.00 - 352,245.00

31,164.00 - 452,925.00

124,560.00 - 247,983.00

5,192.40 - 57,642.40

6,660.00 - 86,336.00

-

-

78,921.00 - 869,109.00

104,328.00 - 940,568.00

78,921.00 - 951,250.00

54,768.00 - 825,174.00

77,340.00 - 992,407.00

77,340.00 - 1,087,939.00

77,340.00 - 1,116,107.00

77,340.00 - 1,135,686.00

77,340.00 - 1,169,533.00

77,340.00 - 1,179,988.00

100,380.00 - 1,242,717.00

100,380.00 - 1,256,453.00

666.00 - 13,776.00

1,515,360.00

1,722,000.00

476.40 - 22,096.00

34,632.00 - 133,062.00

34,632.00 - 144,407.00

43,956.00 - 330,736.00

43,956.00 - 341,563.00

43,956.00 - 486,736.00

43,956.00 60,400.00 425,491.00

43,956.00 - 306,836.00

8,604.00 - 98,505.00

28,950.00 - 151,759.00

22,470.00 - 142,421.00

351,543.00 - 3,685,513.00

399,411.00 - 4,561,301.00

497,781.00 - 8,176,321.00

431,421.00 - 6,375,581.00

351,705.00 - 6,114,185.00

351,543.00 - 5,764,863.00

399,411.00 - 5,844,636.00

10,296.00 - 70,775.00

16,521.00 - 83,483.00

108,630.00 679.50 1,084,309.00

108,630.00 679.50 1,146,809.00

108,630.00 679.50 1,234,309.00

952.20 3.02 1,162.00

4,860.00 47,040.00

4,860.00 47,925.00

1,005.00 27,680.00

3,030.00 25,000.00 28,030.00

7,905.00 - 92,335.00

Page 25: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 25

HARGA SATUAN HARGA SATUAN TOTAL

UPAH ALAT HARGA SATUAN

(Rp) (Rp) (Rp)

5 6 7

10,041.00 - 42,541.00

9,168.00 - 39,168.00

25,776.00 - 63,036.00

9,681.00 - 43,113.00

13,320.00 - 66,645.00

20,460.00 - 438,160.00

26,640.00 - 86,615.00

18,888.00 - 84,068.00

7,992.00 - 50,362.00

9,690.00 - 28,520.00

5,124.00 - 28,409.00

8,352.00 - 38,907.00

68,160.00 - 321,005.00

6,660.00 - 33,445.00

4,764.00 - 13,769.00

23,100.00 - 199,850.00

23,100.00 - 93,800.00

24,600.00 - 212,350.00

182,634.00 - 825,634.00

201,180.00 - 348,780.00

63,495.00 - 792,695.00

9,324.00 - 72,203.50

25,308.00 - 143,870.00

4,766.40 - 13,470.00

5,244.00 - 15,580.00

5,721.60 - 18,641.00

6,194.40 - 28,090.00

6,672.00 - 30,608.00

7,149.60 - 42,373.00

8,940.90 - 53,820.00

10,726.80 - 75,870.00

7,080.00 15.10 8,187.00

11,670.00 30.20 13,884.00

10,767.00 377.50 15,536.00

14,160.00 45.30 16,502.00

14,523.00 755.00 35,274.00

23,865.00 1,132.50 50,414.00

25,320.00 755.00 147,550.00

25,320.00 755.00 112,200.00

25,320.00 755.00 183,405.00

25,320.00 755.00 124,825.00

25,320.00 755.00 114,725.00

25,320.00 755.00 146,918.00

25,320.00 755.00 127,350.00

3,840.00 646.80 54,452.00

345,000.00 178,525.00 523,525.00

- - 3,490.00

- - 1,745.00

- - 1,047.00

- - 130.00

319,800.00 - 2,148,100.00

1,797.00 - 50,759.00

1,797.00 - 72,240.00

14,364.00 1,812.00 97,776.00

14,412.00 2,412.00 45,224.00

Page 26: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 26

HARGA SATUAN HARGA SATUAN TOTAL

UPAH ALAT HARGA SATUAN

(Rp) (Rp) (Rp)

5 6 7

2,882.40 2,412.00 18,814.40

12,456.00 1,510.00 52,966.00

173,400.00 15,100.00 6,794,500.00

177,000.00 15,100.00 8,468,100.00

190,500.00 15,100.00 10,076,800.00

204,000.00 15,100.00 15,591,100.00

217,500.00 15,100.00 17,890,600.00

231,000.00 15,100.00 32,412,100.00

244,500.00 15,100.00 39,769,600.00

150,300.00 15,100.00 396,300.00

150,300.00 15,100.00 396,300.00

5,688.00 - 30,630.00

5,688.00 - 30,183.00

29,430.00 - 282,097.00

22,656.00 - 58,831.00

Page 27: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 27

HARGA SATUAN HARGA SATUAN TOTAL

UPAH ALAT HARGA SATUAN

(Rp) (Rp) (Rp)

5 6 7

26,640.00 - 100,140.00

26,070.00 - 99,570.00

9,038.40 - 17,038.40

6,240.00 - 14,240.00

12,480.00 - 18,980.00

9,038.40 - 30,038.00

12,048.00 - 67,048.00

15,062.40 - 31,562.00

9,038.40 - 137,738.00

17,724.00 62,949.00

16,392.00 615,067.00

43,500.00 126,875.00

43,500.00 126,777.00

43,500.00 749,432.00

48,420.00 121,437.00

48,420.00 126,437.00

64,260.00 807,179.00

43,500.00 180,862.00

204,600.00 7,248.00 574,318.00

101,100.00 483.20 464,053.00

43,500.00 362.40 666,547.00

48,600.00 604.00 671,889.00

101,100.00 483.20 1,742,113.00

201,000.00 7,248.00 1,848,778.00

3,816.00 6,352.00

6,870.00 29,150.00

3,423.00 36,196.00

8,211.00 46,537.00

4,393.20 16,071.00

3,496.80 10,790.00

11,508.00 14,562.00

22,050.00 29,642.00

84,600.00 104,836.00

26,655.00 44,498.00

26,655.00 87,386.00

Page 28: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 28

DAFTAR ANALISA SATUAN PEKERJAAN DINAS PEKERJAAN UMUM KABUPATEN REMBANG

TAHUN 2013

edisi Jan 2013No. KODE KOEF SAT. URAIAN PAKERJAAN HARGA SAT. JUMLAH

Rp Rp1 3 4 5 6 7 8 = ( 4 X 7 )

I A PEKERJAAN PERSIAPAN

A.1 1M' Pagar Sementara dari Seng Gelombang Tinggi 2,00 mMaterial

1.2500 Btg 39,000.00 48,750.00 2.5000 Kg Portalnd Pozzolan Cement/PPC 1,550.00 3,875.00 1.2000 Lbr Seng Gelombang Kecil 0,90 x 1,80 m 59,000.00 70,800.00 0.0050 m3 Pasir Pasang (Cepu) 230,000.00 1,150.00 0.0090 m3 Batu pecah 1/2 274,000.00 2,466.00 0.0720 m3 Usuk Kayu Meranti 5/7X4m 3,609,000.00 259,848.00 0.0600 Kg Paku u kuran 1' s/d 4 " 17,500.00 1,050.00 0.4500 Kg Menie 24,700.00 11,115.00

Jumlah Bahan 399,054.00 Upah

0.2000 OH Tukang Kayu 51,000.00 10,200.00 0.4000 OH Pekerja 36,000.00 14,400.00 0.0200 OH Kepala Tukang Kayu 54,000.00 1,080.00 0.0200 OH Mandor 48,000.00 960.00

Jumlah Upah 26,640.00

Jumlah Bahan + Upah + Alat 425,694.00 A.2 1M' Pengukuran dan Pemasangan Bouwplank

Material 0.0120 m3 Kayu 5/7x 4m Kayu Kruing 8,000,000.00 96,000.00 0.0200 Kg Paku -ukuran 1" s/d 4" 17,500.00 350.00 0.0070 m3 Kayu Kruing Papan 8,800,000.00 61,600.00

Jumlah Bahan 157,950.00 Upah

0.1000 OH Tukang Kayu 51,000.00 5,100.00 0.1000 OH Pekerja 36,000.00 3,600.00 0.0100 OH Kepala Tukang Kayu 54,000.00 540.00 0.0050 OH Mandor 48,000.00 240.00

Jumlah Upah 9,480.00

Jumlah Bahan + Upah + Alat 167,430.00 A.3 1M2 Pembuatan Kantor Sementara dg Lantai Plesteran

Material 1.2500 Btg Kayu Dolken Ø 8 - 10 / 4 m 39,000.00 48,750.00 0.1800 m3 Kayu lanan (balok/pesagen) 3,609,000.00 649,620.00 0.8500 Kg Paku ukuran 1" s/d 4" 17,500.00 14,875.00 1.1000 Kg Besi Strip 17,800.00 19,580.00 35.0000 Kg Portalnd Pozzolan Cement/PPC 1,550.00 54,250.00 0.2500 m3 Pasir pasang (cepu) 230,000.00 57,500.00 0.1500 m3 Batu pecah 1/2 274,000.00 41,100.00 30.0000 buah Batu bata Merah 500.00 15,000.00 0.2500 Lbr Seng Plat BJLS 0,30 panjang 180 cm 60,300.00 15,075.00 2.0000 daun Jendela Nako lengkap 60,000.00 120,000.00 0.0800 m2 Kaca Bening 5 mm 106,000.00 8,480.00 0.1500 buah Kunci Tanam Kecil 73,500.00 11,025.00 0.3000 buah Engsel H 6,500.00 1,950.00 0.0600 Lbr Teakwood 120 x 240 tb 4 mm 108,000.00 6,480.00

Jumlah Bahan 1,063,685.00 Upah

2.0000 OH Tukang Kayu 51,000.00 102,000.00 1.0000 OH Tukang Batu 51,000.00 51,000.00 2.0000 OH Pekerja 36,000.00 72,000.00 0.3000 OH Kepala Tukang kayu 54,000.00 16,200.00 0.0500 OH Mandor 48,000.00 2,400.00

Jumlah Upah 243,600.00

Jumlah Bahan + Upah + Alat 1,307,285.00 A.4 1M2 Pembuatan Gudang Semen dan Alat-alat

Material 1.7000 Btg Kayu Dolken diameter 8 - 10 / 400 cm 39,000.00 66,300.00 0.2100 m3 Kayu lanan (balok/pesagen) 3,609,000.00 757,890.00 0.3000 Kg Paku ukuran 1' s/d 4" 17,500.00 5,250.00 10.5000 Kg Portalnd Pozzolan Cement/PPC 1,550.00 16,275.00 0.0300 m3 Pasir Pasang (Cepu) 230,000.00 6,900.00 0.0500 m3 Batu pecah 1/2 274,000.00 13,700.00 1.5000 Lbr Seng plat BJLS 0,30 Panjang 180 cm 60,300.00 90,450.00

Jumlah Bahan 956,765.00 Upah

2.0000 OH Tukang Kayu 51,000.00 102,000.00 1.0000 OH Pekerja 36,000.00 36,000.00

Kayu Dolken sengon Ø diameter 8 - 10 / 400 cm

Page 29: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 29

0.2000 OH Kepala Tukang 54,000.00 10,800.00 0.0500 OH Mandor 48,000.00 2,400.00

Jumlah Upah 151,200.00

Jumlah Bahan + Upah + Alat 1,107,965.00 A.5 1M2 Membersihkan Lapangan dan Perataan

Material 0.1000 OH Pekerja 36,000.00 3,600.00 0.0500 OH Mandor 48,000.00 2,400.00

Jumlah Upah 6,000.00

Jumlah Bahan + Upah + Alat 6,000.00 A.6 1M2 Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm

Material 1.0000 Btg Bambu diameter 6 - 8 / 600 cm 18,800.00 18,800.00 0.2500 Kg Tali Ijuk 15,100.00 3,775.00

Jumlah Bahan 22,575.00 Upah

0.1700 OH Tukang Kayu 51,000.00 8,670.00 0.2500 OH Pekerja 36,000.00 9,000.00 0.0020 OH Kepala Tukang 54,000.00 108.00 0.0013 OH Mandor 48,000.00 62.40

Jumlah Upah 17,840.40

Page 30: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 30

Jumlah Bahan + Upah + Alat 40,415.00 A.7 1M3 Bongkaran Beton Bertulang

Upah 6.6670 OH Pekerja 36,000.00 240,012.00 0.3330 OH Mandor 48,000.00 15,984.00

Jumlah Upah 255,996.00

Jumlah Bahan + Upah + Alat 255,996.00 A.8 1M3 Bongkaran Dinding Tembok Bata Merah

Upah 6.6670 OH Pekerja 36,000.00 240,012.00 0.0330 OH Mandor 48,000.00 1,584.00

Jumlah Upah 241,596.00

Jumlah Bahan + Upah + Alat 241,596.00 A.9 1 M3 MEMBONGKAR DINDING BATA / BATU (Batu / bata dipakai lagi)

Upah 3.0000 Org Pekerja 36,000.00 108,000.00 0.0900 Org Mandor 48,000.00 4,320.00

Jumlah Upah 112,320.00

Jumlah Bahan + Upah + Alat 112,320.00 A.10 1 M3 MEMBONGKAR DINDING BATA / BATU (bongkaran tidak dipakai lagi)

Upah 2.0000 Org Pekerja 36,000.00 72,000.00 0.2000 Org Mandor 48,000.00 9,600.00

Jumlah Upah 81,600.00

Jumlah Bahan + Upah + Alat 81,600.00 A.11 1M2 MEMBONGKAR PLESTERAN DINDING

Upah 0.1250 Org pekerja 36,000.00 4,500.00 0.0125 Org Mandor 48,000.00 600.00

Jumlah Upah 5,100.00

Jumlah Bahan + Upah + Alat 5,100.00

A.12 1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran tidak dipakai lagi)Upah

0.1000 Org pekerja 36,000.00 3,600.00 0.0100 Org Mandor 48,000.00 480.00

Jumlah Upah 4,080.00

Jumlah Bahan + Upah + Alat 4,080.00 A.13 1M2 MEMBONGKAR GENTENG / SIRAP (bongkaran dipakai lagi)

Upah 0.5000 Org pekerja 36,000.00 18,000.00 0.0500 Org Mandor 48,000.00 2,400.00

Jumlah Upah 20,400.00

Jumlah Bahan + Upah + Alat 20,400.00

A.14 1M2 MEMBONGKAR RANGKA ATAP/RENG KASO (bongkaran tidak dipakai lagi)Upah

0.1500 Org Pekerja 36,000.00 5,400.00 0.0750 Org Tukang Kayu 51,000.00 3,825.00 0.0075 Org Kepala tukang kayu 54,000.00 405.00 0.0150 Org Mandor 48,000.00 720.00

Jumlah Upah 10,350.00

Jumlah Bahan + Upah + Alat 10,350.00

A.15 1M2 MEMBONGKAR RANGKA ATAP / RENG KASO (bongkaran dipakai lagi)Upah

0.2000 Org Pekerja 36,000.00 7,200.00 0.1000 Org Tukang Kayu 51,000.00 5,100.00 0.0100 Org Kepala tukang kayu 54,000.00 540.00 0.0200 Org Mandor 48,000.00 960.00

Jumlah Upah 13,800.00

Jumlah Bahan + Upah + Alat 13,800.00

A.16 1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran dipakai lagi)Upah

4.0000 Org Pekerja 36,000.00 144,000.00 6.0000 Org Tukang Kayu 51,000.00 306,000.00 0.6000 Org Kepala tukang kayu 54,000.00 32,400.00 0.4000 Org Mandor 48,000.00 19,200.00

Jumlah Upah 501,600.00

Jumlah Bahan + Upah + Alat 501,600.00

A.17 1M3 MEMBONGKAR KUDA-KUDA GORDING/BALOK (bongkaran tidak dipakai lagi)Upah

4.0000 Org Pekerja 36,000.00 144,000.00 3.0000 Org Tukang Kayu 51,000.00 153,000.00 0.4000 Org Mandor 48,000.00 19,200.00

Jumlah Upah 316,200.00

Jumlah Bahan + Upah + Alat 316,200.00

A.18 1M2 MEMBONGKAR PLAFOND (bongkaran dipakai lagi)Upah

Page 31: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 31

0.1000 Org Pekerja 36,000.00 3,600.00 0.3000 Org Tukang Kayu 51,000.00 15,300.00 0.0300 Org Kepala tukang kayu 54,000.00 1,620.00 0.0100 Org Mandor 48,000.00 480.00

Jumlah Upah 21,000.00

Jumlah Bahan + Upah + Alat 21,000.00

A.19 1M2 MEMBONGKAR PLAFOND (bongkaran tidak dipakai lagi)Upah

0.1500 Org Pekerja 36,000.00 5,400.00 0.0150 Org Mandor 48,000.00 720.00

Jumlah Upah 6,120.00

Jumlah Bahan + Upah + Alat 6,120.00

Keterangan : A.20

Biaya setiap jarak pengangkutan/langsiran 1 m3 Upah = K : ( a

( L + 75 ))K = Biaya

275.0000 a = Upah PekerjaL = Jarak angkut

Keterangan : A.21

Biaya setiap jarak pengangkutan / langsiran 1 zak semen = K : ( a

( L + 75 ))/25K = Biaya

275.0000 a = Upah PekerjaL = Jarak angkut

II B PEKERJAAN TANAH

B.1 1M3 Galian Tanah Biasa Sedalam 1 mUpah

0.400 OH Pekerja 36,000.00 14,400.00 0.040 OH Mandor 48,000.00 1,920.00

Jumlah Upah 16,320.00

Jumlah Bahan + Upah + Alat 16,320.00

Page 32: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 32

B.2 1M3 Galian Tanah Keras Sedalam 1 mUpah

1.000 OH Pekerja 36,000.00 36,000.00 0.032 OH Mandor 48,000.00 1,536.00

Jumlah Upah 37,536.00

Jumlah Bahan + Upah + Alat 37,536.00 B.3 1M3 Galian Tanah Cadas Sedalam 1 m

Upah 1.500 OH Pekerja 36,000.00 54,000.00 0.060 OH Mandor 48,000.00 2,880.00

Jumlah Upah 56,880.00

Jumlah Bahan + Upah + Alat 56,880.00 B.4 1M3 Galian Tanah Lumpur Sedalam 1 m

Upah 1.200 OH Pekerja 36,000.00 43,200.00 0.045 OH Mandor 48,000.00 2,160.00

Jumlah Upah 45,360.00

Jumlah Bahan + Upah + Alat 45,360.00 B.5 1M2 Pekerjaan Striping Setinggi 1 m

Upah 0.050 OH Pekerja 36,000.00 1,800.00 0.005 OH Mandor 48,000.00 240.00

Jumlah Upah 2,040.00

Jumlah Bahan + Upah + Alat 2,040.00 B.6 1M3 Membuang Tanah Sejauh 30 m'

Upah 0.330 OH Pekerja 36,000.00 11,880.00 0.010 OH Mandor 48,000.00 480.00

Jumlah Upah 12,360.00

Jumlah Bahan + Upah + Alat 12,360.00

Suppl. B 6 1 M3 PEK. PEMBUANGAN LEBIH DARI RADIUS 30 M

Keterangan :

MENGGUNAKAN RUMUS = K : a

( L + 75 )K = Biaya

275 a = Upah Pekerja

L = Jarak pembuangan

B.7 1M3 Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian) 5,440.00 B.8 1M3 Pemadatan Tanah

Upah 0.500 OH Pekerja 36,000.00 18,000.00 0.050 OH Mandor 48,000.00 2,400.00

Jumlah Upah 20,400.00

Jumlah Bahan + Upah + Alat 20,400.00 B.9 1M3 Urugan Pasir

Material 1.200 m3 Pasir Urug 68,000.00 81,600.00

Jumlah Bahan 81,600.00 Upah

0.300 OH Pekerja 36,000.00 10,800.00 0.010 OH Mandor 48,000.00 480.00

Jumlah Upah 11,280.00

Jumlah Bahan + Upah + Alat 92,880.00 B.9a 1M3 Urugan Tanah Biasa (Tanah Tersedia)

Upah 0.300 OH Pekerja 36,000.00 10,800.00 0.010 OH Mandor 48,000.00 480.00

Jumlah Upah 11,280.00

Jumlah Bahan + Upah + Alat 11,280.00

B.10 1M3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TLMaterial

0.400 m3 Pasir Urug 68,000.00 27,200.00 0.135 m3 Kapur Padam 215,600.00 29,106.00 0.948 m3 Tanah Liat 61,000.00 57,828.00

Jumlah Bahan 114,134.00 Upah

0.800 OH Pekerja 36,000.00 28,800.00 0.400 OH Tukang Batu 51,000.00 20,400.00 0.040 OH Kepala Tukang 54,000.00 2,160.00 0.080 OH Mandor 48,000.00 3,840.00

Jumlah Upah 55,200.00

Jumlah Bahan + Upah + Alat 169,334.00 B.11 1M2 Pemasangan Lapisan Ijuk tebal 10 cm

Material 6.000 kg Ijuk 15,100.00 90,600.00

Jumlah Bahan 90,600.00 Upah

0.150 OH Pekerja 36,000.00 5,400.00

Page 33: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 33

0.015 OH Mandor 48,000.00 720.00 Jumlah Upah 6,120.00

Jumlah Bahan + Upah + Alat 96,720.00 B.12 1M3 Urugan Sirtu

Material 1.200 m3 Sirtu 117,000.00 140,400.00

Jumlah Bahan 140,400.00 Upah

0.250 OH Pekerja 36,000.00 9,000.00 0.025 OH Mandor 48,000.00 1,200.00

Jumlah Upah 10,200.00

Jumlah Bahan + Upah + Alat 150,600.00 B.13 1 M3 Galian Tanah Biasa Sedalam 2 meter

Upah 0.526 OH Pekerja 36,000.00 18,936.00 0.052 OH Mandor 48,000.00 2,496.00

Jumlah Upah 21,432.00

Jumlah Bahan + Upah + Alat 21,432.00

B.14 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 3 M' TENAGA MANUSIA Upah

0.735 org Pekerja 36,000.00 26,460.00 0.073 org Mandor 48,000.00 3,504.00

Jumlah Upah 29,964.00 Alat

0.050 lot Alat bantu 15,100.00 755.00 Jumlah Alat 755.00

Jumlah Bahan + Upah + Alat 30,719.00

B.15 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 4 M' TENAGA MANUSIA Upah

0.944 org Pekerja 36,000.00 33,984.00 0.094 org Mandor 48,000.00 4,512.00

Jumlah Upah 38,496.00 Alat

0.050 lot Alat bantu 15,100.00 755.00 Jumlah Alat 755.00

Jumlah Bahan + Upah + Alat 39,251.00

B.16 1 M3 PEK. GALIAN TANAH BIASA MAX KEDALAMAN 5 M' TENAGA MANUSIA Upah

1.153 org Pekerja 36,000.00 41,508.00 0.115 org Mandor 48,000.00 5,520.00

Jumlah Upah 47,028.00 Alat

0.050 lot Alat bantu 15,100.00 755.00 Jumlah Alat 755.00

Jumlah Bahan + Upah + Alat 47,783.00 B.17 1 M3 PEK. GALIAN TANAH BANYAK TERDAPAT BATU-BATU BUNDAR

MAX KEDALAMAN 1 M' TENAGA MANUSIA Upah

1.500 org Pekerja 36,000.00 54,000.00 0.050 org Mandor 48,000.00 2,400.00

Jumlah Upah 56,400.00 Alat

0.250 lot Alat bantu 15,100.00 3,775.00 Jumlah Alat 3,775.00

Jumlah Bahan + Upah + Alat 60,175.00

Page 34: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 34

B.18 1 M3 PEK. GALIAN TANAH BERBATU MAX KEDALAMAN 1 M' TNG MANUSIA Upah

0.625 org Pekerja 36,000.00 22,500.00 0.125 org Mandor 48,000.00 6,000.00

Jumlah Upah 28,500.00 Alat

0.250 lot Alat bantu 15,100.00 3,775.00

Jumlah Alat 3,775.00

Jumlah Bahan + Upah + Alat 32,275.00

B.19 1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 2 M' DENGAN ALAT BERATAlat

0.0046 unit Sewa Excavator 0,9 m3 1,025,000.00 4,715.00 0.7043 liter Solar 4,500.00 3,169.35 0.0183 liter Olie (minyak pelumas) 22,000.00 402.60 0.0046 Kg Stempet 22,100.00 101.66

Jumlah Alat 8,388.61 Upah

0.0046 org Operator Terlatih 51,000.00 234.60 0.0046 org Pemb. Operator Alat Berat 42,000.00 193.20 0.0046 org Pekerja 36,000.00 165.60 0.0023 org Mandor 48,000.00 110.40

Jumlah Upah 703.80

Jumlah Bahan + Upah + Alat 9,092.00

B.20 1 M3 PEK. GALIAN TANAH MAX KEDALAMAN 5 M' DENGAN ALAT BERATAlat

0.0060 unit Sewa Excavator 0,9 m3 1,025,000.00 6,150.00 0.9210 liter Solar 4,500.00 4,144.50 0.0239 liter Olie (minyak pelumas) 22,000.00 525.80 0.0060 Kg Stempet 22,100.00 132.60

Jumlah Alat 10,952.90 Upah

0.0060 org Operator terlatih 51,000.00 306.00 0.0060 org Pemb. Operator 42,000.00 252.00 0.0060 org Pekerja 36,000.00 216.00 0.0015 org Mandor 48,000.00 72.00

Jumlah Upah 846.00

Jumlah Bahan + Upah + Alat 11,798.00

B.21 MENGANGKUT HASIL GALIAN DENGAN DUMP TRUCK . M3/KM.Alat

0.0101 buah Sewa Dump Truck 275,000.00 2,777.50 0.2515 liter Solar 4,500.00 1,131.75 0.0101 liter Olie (minyak pelumas) 22,000.00 222.20 0.0050 Kg Stempet 22,100.00 110.50

Jumlah Alat 4,241.95 Upah 0.0101 org Sopir 48,000.00 484.80 0.0101 org Pekerja 36,000.00 363.60 0.0025 org Mandor 48,000.00 120.00

Jumlah Upah 968.40

Jumlah Bahan + Upah + Alat 5,210.00

B.22 1 M3. MENGANGKUT HASIL GALIAN EXAVATOR MAX 1,5 KM ( DENGAN DUMP TRUCK )KURANG DARI 1,5 KM.

Alat 0.0137 buah Sewa Dump Truck 275,000.00 3,767.50 0.3430 liter Solar 4,500.00 1,543.50 0.0137 liter Olie (minyak pelumas) 22,000.00 301.40 0.0069 Kg Stempet 22,100.00 152.49

Jumlah Alat 5,764.89 Upah

0.0137 org Sopir 48,000.00 657.60 0.0137 org Pekerja 36,000.00 493.20 0.0034 org Mandor 48,000.00 163.20

Jumlah Upah 1,314.00

Jumlah Bahan + Upah + Alat 7,078.00

B.23 1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK JARAK ANTARA 1,5 S/D 3 KM.

Alat 0.0229 buah Dump Truck 275,000.00 6,297.50 0.5717 liter Solar 4,500.00 2,572.65 0.0229 liter Olie 22,000.00 503.80 0.0114 Kg Stempet 22,100.00 251.94

Jumlah Alat 9,625.89 Upah

0.0229 org Sopir 48,000.00 1,099.20 0.0229 org Pekerja 36,000.00 824.40 0.0057 org Mandor 48,000.00 273.60

Jumlah Upah 2,197.20

Jumlah Bahan + Upah + Alat 11,823.00

B.24 1 M3. MENGANGKUT HASIL GALIAN EXAVATOR 0,7 M3 DENGAN DUMP TRUCK

Page 35: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 35

JARAK ANTARA 3 S/D 5 KM.Alat

0.0320 buah Dump Truck 275,000.00 8,800.00 0.8003 liter Solar 4,500.00 3,601.35 0.0320 liter Olie 22,000.00 704.00 0.0160 Kg Stempet 22,100.00 353.60

Jumlah Alat 13,458.95 Upah

0.0320 org Sopir 48,000.00 1,536.00 0.0320 org Pekerja 36,000.00 1,152.00 0.0080 org Mandor 48,000.00 384.00

Jumlah Upah 3,072.00

Jumlah Bahan + Upah + Alat 16,530.00

B.25 1 M3 MERATAKAN TANAH Upah

0.2500 org Pekerja 36,000.00 9,000.00 0.0100 org Mandor 48,000.00 480.00

Jumlah Upah 9,480.00 Alat

0.1250 lot Alat bantu 15,100.00 1,887.50 Jumlah Alat 1,887.50

Jumlah Bahan + Upah + Alat 11,367.00 B.26 1 M3 PEK. URUGAN TANAH PILIHAN

Material 1.2000 m3 Tanah pilihan 76,000.00 91,200.00

Jumlah Bahan 91,200.00 Upah

0.3000 org Pekerja 36,000.00 10,800.00 0.0100 org Mandor 48,000.00 480.00

Jumlah Upah 11,280.00 Alat

0.1000 lot Alat bantu 15,100.00 1,510.00 Jumlah Alat 1,510.00

Jumlah Bahan + Upah + Alat 103,990.00 B.27 1 M3 PEK. LAPISAN PUDEL 1 KP : 3 TL

Material 0.2000 m3 Kapur padam 215,600.00 43,120.00 1.0000 m3 Tanah liat 61,000.00 61,000.00

Jumlah Bahan 104,120.00 Upah

1.0000 org Pekerja 36,000.00 36,000.00 0.5000 org Tukang batu 51,000.00 25,500.00 0.0500 org Kepala tukang batu 54,000.00 2,700.00 0.0100 org Mandor 48,000.00 480.00

Jumlah Upah 64,680.00

Jumlah Bahan + Upah + Alat 168,800.00

Page 36: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 36

B.28 1 M3 PEK. LAPISAN PUDEL 1 KP : 5 PSMaterial

1.0000 m3 Pasir pasang 230,000.00 230,000.00 0.2000 m3 Kapur padam 215,600.00 43,120.00

Jumlah Bahan 273,120.00 Upah

1.0000 org Pekerja 36,000.00 36,000.00 0.5000 org Tukang batu 51,000.00 25,500.00 0.0500 org Kepala tukang batu 54,000.00 2,700.00 0.0100 org Mandor 48,000.00 480.00

Jumlah Upah 64,680.00

Jumlah Bahan + Upah + Alat 337,800.00

B.29 1 M3 MERATAKAN TANAH DAN DITIMBRIS Upah

0.2500 org Pekerja 36,000.00 9,000.00 0.0100 org Mandor 48,000.00 480.00

Jumlah Upah 9,480.00 Alat

0.1250 lot Alat bantu 15,100.00 1,887.50 Jumlah Alat 1,887.50

Jumlah Bahan + Upah + Alat 11,367.00 B.30 1 M2 MENGAMBIL DAN PASANGAN GEBALAN

Upah 0.1500 org Pekerja 36,000.00 5,400.00 0.0150 org Mandor 48,000.00 720.00

Jumlah Upah 6,120.00 Alat

0.0125 lot Alat bantu 15,100.00 188.75 Jumlah Alat 188.75

Jumlah Bahan + Upah + Alat 6,308.00

B.31 1 M' MENGANGKUT GEBALAN RUMPUT Upah

0.0500 org Pekerja 36,000.00 1,800.00 0.0050 org Mandor 48,000.00 240.00

Jumlah Upah 2,040.00 Alat

0.0125 lot Alat bantu 15,100.00 188.75 Jumlah Alat 188.75

Jumlah Bahan + Upah + Alat 2,228.00

B.32 1 M2 PEKERJAAN GEBALAN RUMPUT SAMPAI TUMBUHMaterial

1.2000 m2 Gembalan rumput biasa 15,100.00 18,120.00 Jumlah Bahan 18,120.00

Upah 0.2000 org Pekerja 36,000.00 7,200.00 0.0150 org Mandor 48,000.00 720.00

Jumlah Upah 7,920.00 Alat

0.0125 lot Alat bantu 15,100.00 188.75 Jumlah Alat 188.75

Jumlah Bahan + Upah + Alat 26,228.00

B.33 1 M2 URUGAN PAKAI ALAT BESAR TANAH DARI LUAR DIPADATKAN (U/5000 M3) 0.6000 m3 Pekerjaan galian (10 org) 50 % (Analis B1) 8,160.00 4,896.00 0.6000 m3 Pek. Galian tanah berbatu (10 org) 50 % (Analis B17) 30,087.50 18,052.50 5.0000 m3 Pek. Grading plant (10) 50 % (5 x Analis B5) 1,020.00 5,100.00 1.2000 m3 Tanah Biasa 55,000.00 66,000.00

JUMLAH 94,048.00 III C PEKERJAAN PONDASI

C.1 1M3 Pasang Pondasi Batu Kali 1Pc : 3 Ps Material

1.200 m3 Batu Belah 15/20 125,000.00 150,000.00 202.000 Kg Portland Sement 1,550.00 313,100.00 0.485 m3 Pasir Pasang 230,000.00 111,550.00

Jumlah Bahan 574,650.00 Upah

1.500 OH Pekerja 36,000.00 54,000.00 0.600 OH Tukang Batu 51,000.00 30,600.00 0.060 OH Kepala Tukang 54,000.00 3,240.00 0.075 OH Mandor 48,000.00 3,600.00

Jumlah Upah 91,440.00

Jumlah Bahan + Upah + Alat 666,090.00 C.1a 1 M3 PASANGAN BATU BELAH 1 : 4

Material 1.1000 m3 Batu Belah 15/20 125,000.00 137,500.00 163.0000 kg PC (50 kg) 1,550.00 252,650.00 0.5200 m3 Pasir pasang 230,000.00 119,600.00

Jumlah Bahan 509,750.00 Upah

Page 37: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 37

1.5000 org Pekerja 36,000.00 54,000.00 0.6000 org Tukang batu 51,000.00 30,600.00 0.0600 org Kepala tukang batu 54,000.00 3,240.00 0.0750 org Mandor 48,000.00 3,600.00

Jumlah Upah 91,440.00

Jumlah Bahan + Upah + Alat 601,190.00 C.2 1M3 Pasang Pondasi Batu Kali 1Pc : 5 Ps

Material 1.200 m3 Batu Belah 15/20 125,000.00 150,000.00 136.000 Kg Portland Sement 1,550.00 210,800.00 0.544 m3 Pasir Pasang 230,000.00 125,120.00

Jumlah Bahan 485,920.00 Upah

1.500 OH Pekerja 36,000.00 54,000.00 0.600 OH Tukang Batu 51,000.00 30,600.00 0.060 OH Kepala Tukang 54,000.00 3,240.00 0.075 OH Mandor 48,000.00 3,600.00

Jumlah Upah 91,440.00

Jumlah Bahan + Upah + Alat 577,360.00 C.3 1M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 Ps

Material 1.200 m3 Batu Belah 15/20 125,000.00 150,000.00 61.000 kg Portland Sement 1,550.00 94,550.00 0.147 m3 Kapur Pasang 215,600.00 31,693.20 0.492 m3 Pasir Pasang 230,000.00 113,160.00

Jumlah Bahan 389,403.20 Upah

. 1.500 OH Pekerja 36,000.00 54,000.00 0.600 OH Tukang Batu 51,000.00 30,600.00 0.060 OH Kepala Tukang 54,000.00 3,240.00 0.075 OH Mandor 48,000.00 3,600.00

Jumlah Upah 91,440.00

Jumlah Bahan + Upah + Alat 480,843.00

Page 38: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 38

C.4 1M3 Pasang Pondasi Batu KosongMaterial

1.200 m3 Batu Belah 15/20 125,000.00 150,000.00 0.432 m3 Pasir Urug 68,000.00 29,376.00

Jumlah Bahan 179,376.00 Upah

. 0.700 OH Pekerja 36,000.00 25,200.00 0.390 OH Tukang Batu 51,000.00 19,890.00 0.039 OH Kepala Tukang 54,000.00 2,106.00 0.039 OH Mandor 48,000.00 1,872.00

Jumlah Upah 49,068.00

Jumlah Bahan + Upah + Alat 228,444.00 C.4a 1M3 Pasang Batu Bolder

Material 1.100 m3 Batu Bolder 238,000.00 261,800.00

Jumlah Bahan 261,800.00 Alat + BBM 0.010 unit Sewa Excavator 0.90 m3 1,025,000.00 10,250.00 0.715 ltr Solar (minyak diesel) 4,500.00 3,217.50 0.021 ltr Olie (minyak pelumas) 22,000.00 462.00 0.005 kg Stempet 22,100.00 110.50

Jumlah Alat 14,040.00 Upah

. 0.009 OH Operator terlatih 51,000.00 459.00 0.009 OH Pembantu Operator 42,000.00 378.00 0.005 OH Pekerja 36,000.00 180.00 0.002 OH Mandor 48,000.00 110.40

Jumlah Upah 1,127.40

Jumlah Bahan + Upah + Alat 276,967.00

C.5 1M3 Pasang Pondasi Siklop 60% Beton Camp. 1PC : 2PS : 3KR & 40% Batu Belah

Material 0.480 m3 Batu Belah 15/20 125,000.00 60,000.00 126.000 Kg Besi Beton 12,200.00 1,537,200.00 194.000 Kg Portland Semen 1,550.00 300,700.00 0.312 m3 Pasir Beton (Cepu) 250,000.00 78,000.00 0.468 m3 Koral Beton 274,000.00 128,232.00 1.800 Kg Kawat Beton 20,000.00 36,000.00

Jumlah Bahan 2,140,132.00 Upah

3.000 OH Pekerja 36,000.00 108,000.00 0.850 OH Tukang Batu 51,000.00 43,350.00 0.085 OH Kepala Tukang 54,000.00 4,590.00 0.015 OH Mandor 48,000.00 720.00

Jumlah Upah 156,660.00

Jumlah Bahan + Upah + Alat 2,296,792.00 C.6 1M3 Pasang Pondasi Sumuran diameter 100 cm

Material 0.450 m3 Batu Belah 15/20 cm 125,000.00 56,250.00 194.000 Kg Portland Semen 1,750.00 339,500.00 0.312 m3 Pasir Pasang 230,000.00 71,760.00 0.468 m3 Koral Beton 274,000.00 128,232.00

Jumlah Bahan 595,742.00 Upah

2.380 OH Pekerja 36,000.00 85,680.00 0.300 OH Tukang Batu 51,000.00 15,300.00 0.030 OH Kepala Tukang 54,000.00 1,620.00 0.080 OH Mandor 48,000.00 3,840.00

Jumlah Upah 106,440.00

Jumlah Bahan + Upah + Alat 702,182.00

C.7 1M' Pembuatan Tiang Pancang (40x40) cm, Beton BertulangMaterial

0.019 m3 Pasir Urug (Timbunan) 68,000.00 1,292.00 0.094 m3 Pasir Beton (Cepu) 250,000.00 23,500.00 0.150 m3 Koral Beton 274,000.00 41,100.00 60.500 Kg Portland Semen 1,750.00 105,875.00 45.000 Kg Besi Beton 12,200.00 549,000.00 0.900 Kg Kawat beton 20,000.00 18,000.00 0.032 m3 Kayu Kamper(balok pesagen) 9,769,000.00 312,608.00 0.120 Kg Paku uk. 1" s/d 4" 17,500.00 2,100.00 0.090 Lt Minyak Bekisting 24,200.00 2,178.00 0.240 Kg Plamur Tembok 21,200.00 5,088.00

Jumlah Bahan 1,060,741.00 Upah

1.000 OH Pekerja 36,000.00 36,000.00 0.670 OH Tukang Batu 51,000.00 34,170.00 0.067 OH Kepala Tukang 54,000.00 3,618.00 0.050 OH Mandor 48,000.00 2,400.00

Jumlah Upah 76,188.00

Jumlah Bahan + Upah + Alat 1,136,929.00

Page 39: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 39

C.8 SEBUAH TIANG PANCANG DICINCIN DAN DILANCIPKAN (KAYU HUTAN)Material

1.000 btg 39,000.00 39,000.00 Jumlah Bahan 39,000.00

Upah 0.1250 org Tukang Kayu 51,000.00 6,375.00 0.0125 org Kepala Tukang 54,000.00 675.00 0.1500 org Pekerja 36,000.00 5,400.00 0.0100 org Mandor 48,000.00 480.00

Jumlah Upah 12,930.00 Alat

0.0100 lot alat bantu 15,100.00 151.00 Jumlah Alat 151.00

Jumlah Bahan + Upah + Alat 52,081.00

C.9 1 M' TIANG DIPANCANGKAN DIDALAM TANAH LUNAK Upah

0.0400 org Tukang Kayu 51,000.00 2,040.00 0.0040 org Kepala Tukang 54,000.00 216.00 1.8000 org Pekerja 36,000.00 64,800.00 0.0430 org Mandor 48,000.00 2,064.00

Jumlah Upah 69,120.00 Alat

0.0100 lot alat bantu 15,100.00 151.00 Jumlah Alat 151.00

Jumlah Bahan + Upah + Alat 69,271.00

C.10 1 M' TIANG DIPANCANGKAN DIDALAM TANAH BIASA Upah

0.0500 org Tukang Kayu 51,000.00 2,550.00 0.0050 org Kepala Tukang 54,000.00 270.00 2.2500 org Pekerja 36,000.00 81,000.00 0.0538 org Mandor 48,000.00 2,582.40

Jumlah Upah 86,402.40 Alat

0.0125 lot alat bantu 15,100.00 188.75 Jumlah Alat 188.75

Jumlah Bahan + Upah + Alat 86,591.00

C.11 1 M' TIANG DIPANCANGKAN DIDALAM TANAH KERAS

Upah

0.0600 org Tukang Kayu 51,000.00 3,060.00

0.0060 org Kepala Tukang 54,000.00 324.00

2.7000 org Pekerja 36,000.00 97,200.00

0.0645 org Mandor 48,000.00 3,096.00

Jumlah Upah 103,680.00

Alat

0.0150 lot alat bantu 15,100.00 226.50

Jumlah Alat 226.50

Jumlah Bahan + Upah + Alat 103,906.00

Kayu dolken sengon Ø 8 - 10 cm, 4 M

Page 40: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 40

C.12 1 M' TIANG DIPANCANGKAN DIDALAM TANAH PASIR

Upah

0.0600 org Tukang Kayu 51,000.00 3,060.00

0.0060 org Kepala Tukang 54,000.00 324.00

1.9800 org Pekerja 36,000.00 71,280.00

0.0645 org Mandor 48,000.00 3,096.00

Jumlah Upah 77,760.00

Alat

0.0125 lot alat bantu 15,100.00 188.75

Jumlah Alat 188.75

Jumlah Bahan + Upah + Alat 77,948.00

C.13 1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 3 MM

Material

1.2000 m3 Batu belah 125,000.00 150,000.00

8.3333 kg Kawat bronjong 20,400.00 169,999.32

Jumlah Bahan 319,999.32

Upah

0.6667 org penganyam 51,000.00 34,001.70

2.0333 org Pekerja 36,000.00 73,198.80

0.0517 org Mandor 48,000.00 2,481.60

Jumlah Upah 109,682.10

Jumlah Bahan + Upah + Alat 429,681.00

C.14 1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 4 MM

Material

1.2000 m3 Batu belah 125,000.00 150,000.00

15.0000 kg Kawat bronjong 20,400.00 306,000.00

Jumlah Bahan 456,000.00

Upah

0.7333 org penganyam 51,000.00 37,398.30

2.1000 org Pekerja 36,000.00 75,600.00

0.0517 org Mandor 48,000.00 2,481.60

Jumlah Upah 115,479.90

Jumlah Bahan + Upah + Alat 571,479.00

C.15 1 M3 PASANGAN BATU BRONJONG UNTUK KAWAT 5 MM

Material

1.2000 m3 Batu belah 125,000.00 150,000.00

23.3333 kg Kawat bronjong 20,400.00 475,999.32

Jumlah Bahan 625,999.32

Upah

0.8333 org tukang besi 51,000.00 42,498.30

2.1667 org Pekerja 36,000.00 78,001.20

0.0517 org Mandor 48,000.00 2,481.60

Jumlah Upah 122,981.10

Jumlah Bahan + Upah + Alat 748,980.00

IV D P E K E R J A A N D I N D I N G

D.1 1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 2 Ps

Material

70.0000 Buah Bata Merah 5 x 11 x 22 500.00 35,000.00

18.9500 Kg Portland Semen 1,550.00 29,372.50

0.0380 m3 Pasir Pasang 230,000.00 8,740.00

Jumlah Bahan 73,112.50

Upah

0.3000 OH Pekerja 36,000.00 10,800.00

0.1000 OH Tukang Batu 51,000.00 5,100.00

0.0100 OH Kepala Tukang 54,000.00 540.00

0.0150 OH Mandor 48,000.00 720.00

Jumlah Upah 17,160.00

Jumlah Bahan + Upah + Alat 90,272.00

D.2 1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Ps

Material

70.0000 Buah Bata Merah 5 x 11 x 22 500.00 35,000.00

14.3700 Kg Portland Semen 1,550.00 22,273.50

0.0400 m3 Pasir Pasang 230,000.00 9,200.00

Jumlah Bahan 66,473.50

Upah

0.3000 OH Pekerja 36,000.00 10,800.00

Page 41: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 41

0.1000 OH Tukang Batu 51,000.00 5,100.00

0.0100 OH Kepala Tukang 54,000.00 540.00

0.0150 OH Mandor 48,000.00 720.00

Jumlah Upah 17,160.00

Jumlah Bahan + Upah + Alat 83,633.00

D.3 1M2 Pasang Batu Merah Tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps

Material

70.0000 Buah Bata Merah 5 x 11 x 22 500.00 35,000.00

4.5000 Kg Portland Semen 1,550.00 6,975.00

0.0500 m3 Pasir Pasang 230,000.00 11,500.00

0.0150 m3 Kapur Padam 215,600.00 3,234.00

Jumlah Bahan 56,709.00

Upah

0.3000 OH Pekerja 36,000.00 10,800.00

0.1000 OH Tukang Batu 51,000.00 5,100.00

0.0100 OH Kepala Tukang 54,000.00 540.00

0.0150 OH Mandor 48,000.00 720.00

Jumlah Upah 17,160.00

Jumlah Bahan + Upah + Alat 73,869.00

D.4 1 M2 PASANGAN 1/2 BATA MERAH 1 : 4

Material

70.0000 bh Bata merah 500.00 35,000.00

11.5000 kg P C (50 kg) 1,550.00 17,825.00

0.0430 m3 Pasir pasang 230,000.00 9,890.00

Jumlah Bahan 62,715.00

Upah

0.3200 org Pekerja 36,000.00 11,520.00

0.1000 org Tukang batu 51,000.00 5,100.00

0.0100 org Kepala tukang batu 54,000.00 540.00

0.0150 org Mandor 48,000.00 720.00

Jumlah Upah 17,880.00

Jumlah Bahan + Upah + Alat 80,595.00

Page 42: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 42

D.5 1 M2 PASANGAN 1/2 BATA MERAH 1 : 5Material

70.0000 bh Bata merah 500.00 35,000.00 9.6800 kg P C (50 kg) 1,550.00 15,004.00 0.0450 m3 Pasir pasang 230,000.00 10,350.00

Jumlah Bahan 60,354.00 Upah

0.3200 org Pekerja 36,000.00 11,520.00 0.1000 org Tukang batu 51,000.00 5,100.00 0.0100 org Kepala tukang batu 54,000.00 540.00 0.0150 org Mandor 48,000.00 720.00

Jumlah Upah 17,880.00

Jumlah Bahan + Upah + Alat 78,234.00

D.6 1 M2 PASANGAN BATU TEMPEL + SIARANMaterial

1.1000 m2 Batu tempel 101,000.00 111,100.00 0.1200 zak PC (50 kg) 77,500.00 9,300.00 0.0310 m3 Pasir pasang 230,000.00 7,130.00

Jumlah Bahan 127,530.00 Upah

0.1875 org Pekerja 36,000.00 6,750.00 0.2250 org Tukang batu 51,000.00 11,475.00 0.3750 org Kepala tukang batu 54,000.00 20,250.00 0.3380 org Mandor 48,000.00 16,224.00 0.0250 lot Peralatan 15,100.00 377.50

Jumlah Upah 55,076.50

Jumlah Bahan + Upah + Alat 182,606.00

D.7 1 M3 PASANGAN BATA MERAH 1 PC : 2 PSMaterial

500.0000 bh Bata merah 500.00 250,000.00 4.1176 zak P C (50 kg) 77,500.00 319,114.00 0.3330 m3 Pasir pasang 230,000.00 76,590.00

Jumlah Bahan 645,704.00 Upah

4.5000 org Pekerja 36,000.00 162,000.00 1.5000 org Tukang batu 51,000.00 76,500.00 0.1500 org Kepala tukang batu 54,000.00 8,100.00 0.2250 org Mandor 48,000.00 10,800.00

Jumlah Upah 257,400.00

Jumlah Bahan + Upah + Alat 903,104.00

D.8 1 M3 PASANGAN BATA MERAH 1 PC : 4 PSMaterial

500.0000 bh Bata merah 500.00 250,000.00 2.5328 zak P C (50 kg) 77,500.00 196,292.00 0.4060 m3 Pasir pasang 230,000.00 93,380.00

Jumlah Bahan 539,672.00 Upah

4.5000 org Pekerja 36,000.00 162,000.00 1.5000 org Tukang batu 51,000.00 76,500.00 0.1500 org Kepala tukang batu 54,000.00 8,100.00 0.2250 org Mandor 48,000.00 10,800.00

Jumlah Upah 257,400.00

Jumlah Bahan + Upah + Alat 797,072.00

D.9 1 M3 PASANGAN BATA MERAH 1 PC : 3 KP : 10 PSMaterial

500.0000 bh Bata merah 500.00 250,000.00 0.9384 zak P C (50 kg) 77,500.00 72,726.00 0.1100 m3 Kapur pasang 215,600.00 23,716.00 0.3680 m3 Pasir pasang 230,000.00 84,640.00

Jumlah Bahan 431,082.00 Upah

4.5000 org Pekerja 36,000.00 162,000.00 1.5000 org Tukang batu 51,000.00 76,500.00 0.1500 org Kepala tukang batu 54,000.00 8,100.00 0.2250 org Mandor 48,000.00 10,800.00

Jumlah Upah 257,400.00

Jumlah Bahan + Upah + Alat 688,482.00

D.10 1 M3 PASANGAN DINDING BATACO TEBAL 1/2 BATA (1 PC : 3 PS)Material

12.0000 bh Bataco Besar (10/20/40) 4,300.00 51,600.00 8.6400 kg P C (50 kg) 1,550.00 13,392.00 0.0324 m3 Pasir pasang 230,000.00 7,452.00

Jumlah Bahan 72,444.00 Upah

0.2400 org Pekerja 36,000.00 8,640.00 0.1000 org Tukang batu 51,000.00 5,100.00 0.0100 org Kepala tukang batu 54,000.00 540.00 0.0100 org Mandor 48,000.00 480.00

Jumlah Upah 14,760.00

Page 43: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 43

Jumlah Bahan + Upah + Alat 87,204.00

D.11 1 M3 PASANGAN DINDING BATACO TEBAL 1/2 BATA (1 PC : 5 PS)Material

12.0000 bh Bataco Besar (10/20/40) 4,300.00 51,600.00 7.2000 kg P C (50 kg) 1,550.00 11,160.00 0.0270 m3 Pasir pasang 230,000.00 6,210.00

Jumlah Bahan 68,970.00 Upah

0.2400 org Pekerja 36,000.00 8,640.00 0.1000 org Tukang batu 51,000.00 5,100.00 0.0100 org Kepala tukang batu 54,000.00 540.00 0.0100 org Mandor 48,000.00 480.00

Jumlah Upah 14,760.00

Jumlah Bahan + Upah + Alat 83,730.00

D.12 1 M3 PASANGAN DINDING BATACO TEBAL 1/2 BATA Dengan pasir kwarsa (1 PC : 3 PS)Material

12.0000 bh Bataco Besar (10/20/40) 4,300.00 51,600.00 8.6400 kg P C (50 kg) 1,550.00 13,392.00 0.0324 m3 Pasir kwarsa 134,000.00 4,341.60

Jumlah Bahan 69,333.60 Upah

0.2400 org Pekerja 36,000.00 8,640.00 0.1000 org Tukang batu 51,000.00 5,100.00 0.0100 org Kepala tukang batu 54,000.00 540.00 0.0100 org Mandor 48,000.00 480.00

Jumlah Upah 14,760.00

Jumlah Bahan + Upah + Alat 84,093.00

D.13 1 M3 PASANGAN DINDING BATACO TEBAL 1/2 BATA Dengan pasir kwarsa (1 PC : 5 PS)Material

12.0000 bh Bataco Besar (10/20/40) 4,300.00 51,600.00 7.2000 kg P C (50 kg) 1,550.00 11,160.00 0.0270 m3 Pasir kwarsa 134,000.00 3,618.00

Jumlah Bahan 66,378.00 Upah

0.2400 org Pekerja 36,000.00 8,640.00 0.1000 org Tukang batu 51,000.00 5,100.00 0.0100 org Kepala tukang batu 54,000.00 540.00 0.0100 org Mandor 48,000.00 480.00

Jumlah Upah 14,760.00

Jumlah Bahan + Upah + Alat 81,138.00

V E PEKERJAAN P L E S T E R A N

E.1 1M2 Plesteran 1 Pc : 3 Ps Tebal 15 mmMaterial

7.7600 Kg Portland Semen 1,550.00 12,028.00 0.0230 m3 Pasir Pasang 230,000.00 5,290.00

Jumlah Bahan 17,318.00 Upah

0.2000 OH Pekerja 36,000.00 7,200.00 0.1500 OH Tukang batu 51,000.00 7,650.00 0.0015 OH Kepala Tukang 54,000.00 81.00 0.0100 OH Mandor 48,000.00 480.00

Jumlah Upah 15,411.00

Jumlah Bahan + Upah + Alat 32,729.00

E.2 1M2 Plesteran 1 Pc : 2 Kp : 8 Ps Tebal 15 mmMaterial

3.0000 Kg Portland Semen 1,550.00 4,650.00 0.0050 m3 Kapur Padam 215,600.00 1,078.00 0.0200 m3 Pasir Pasang 230,000.00 4,600.00

Jumlah Bahan 10,328.00 Upah

0.2200 OH Pekerja 36,000.00 7,920.00 0.1200 OH Tukang batu 51,000.00 6,120.00 0.0120 OH Kepala Tukang 54,000.00 648.00 0.0110 OH Mandor 48,000.00 528.00

Jumlah Upah 15,216.00

Jumlah Bahan + Upah + Alat 25,544.00

E.3 1M2 Plesteran 1 Pc : 3 Kp : 10 Ps Tebal 15 mmMaterial

1.8400 Kg Portland Semen 1,550.00 2,852.00 0.0060 m3 Kapur Padam 215,600.00 1,293.60 0.0140 m3 Pasir Pasang 230,000.00 3,220.00

Jumlah Bahan 7,365.60

Page 44: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 44

Upah 0.2000 OH Pekerja 36,000.00 7,200.00 0.1500 OH Tukang batu 51,000.00 7,650.00 0.0015 OH Kepala Tukang 54,000.00 81.00 0.0100 OH Mandor 48,000.00 480.00

Jumlah Upah 15,411.00

Jumlah Bahan + Upah + Alat 22,776.00

Page 45: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 45

E.4 1M2 Plesteran 1 Pc : 3 Ps Tebal 20 mmMaterial

10.3680 Kg Portland Semen 1,550.00 16,070.40 0.0310 m3 Pasir Pasang 230,000.00 7,130.00

Jumlah Bahan 23,200.40 Upah

0.2600 OH Pekerja 36,000.00 9,360.00 0.2000 OH Tukang batu 51,000.00 10,200.00 0.0200 OH Kepala Tukang 54,000.00 1,080.00 0.0125 OH Mandor 48,000.00 600.00

Jumlah Upah 21,240.00

Jumlah Bahan + Upah + Alat 44,440.00

E.4a 1M2 Plesteran 1 Pc : 3 Ps Tebal 10 mmMaterial

5.1733 Kg Portland Semen 1,550.00 8,018.62 0.0200 m3 Pasir Pasang 230,000.00 4,600.00

Jumlah Bahan 12,618.62 Upah

0.1500 OH Pekerja 36,000.00 5,400.00 0.1200 OH Tukang batu 51,000.00 6,120.00 0.0010 OH Kepala Tukang 54,000.00 54.00 0.0100 OH Mandor 48,000.00 480.00

Jumlah Upah 12,054.00

Jumlah Bahan + Upah + Alat 24,672.00

E.5 1M2 Berapen 1 Pc : 5 Ps Tebal 15 mmMaterial

5.1840 Kg Portland Semen 1,550.00 8,035.20 0.0260 m3 Pasir Pasang 230,000.00 5,980.00

Jumlah Bahan 14,015.20 Upah

0.1500 OH Pekerja 36,000.00 5,400.00 0.0700 OH Tukang batu 51,000.00 3,570.00 0.0070 OH Kepala Tukang 54,000.00 378.00 0.0080 OH Mandor 48,000.00 384.00

Jumlah Upah 9,732.00

Jumlah Bahan + Upah + Alat 23,747.00

E.6 1M' Plesteran Skoning 1 Pc : 2 Ps lebar 10 mmMaterial

4.320 kg Portland Semen 1,550.00 6,696.00 0.006 m3 Pasir Pasang 230,000.00 1,380.00

Jumlah Bahan 8,076.00 Upah

0.0570 OH Pekerja 36,000.00 2,052.00 0.0380 OH Tukang batu 51,000.00 1,938.00 0.0380 OH Kepala Tukang 54,000.00 2,052.00 0.0030 OH Mandor 48,000.00 144.00

Jumlah Upah 6,186.00

Jumlah Bahan + Upah + Alat 14,262.00

E.7 1M2 Plesteran Ciprat 1 Pc : 2 PsMaterial

4.3200 Kg Portland Semen 1,550.00 6,696.00 0.0060 m3 Pasir Pasang 230,000.00 1,380.00

Jumlah Bahan 8,076.00 Upah

0.2500 OH Pekerja 36,000.00 9,000.00 0.1000 OH Tukang batu 51,000.00 5,100.00 0.0100 OH Kepala Tukang 54,000.00 540.00 0.0130 OH Mandor 48,000.00 624.00

Jumlah Upah 15,264.00

Jumlah Bahan + Upah + Alat 23,340.00

E.8 1M2 Finishing Siar Pas. Batu Kali Adukan 1 Pc : 2 PsMaterial

6.3400 Kg Portland Semen 1,550.00 9,827.00 0.0120 m3 Pasir Pasang 230,000.00 2,760.00

Jumlah Bahan 12,587.00 Upah

0.3000 OH Pekerja 36,000.00 10,800.00 0.1400 OH Tukang batu 51,000.00 7,140.00 0.0140 OH Kepala Tukang 54,000.00 756.00 0.0150 OH Mandor 48,000.00 720.00

Jumlah Upah 19,416.00

Jumlah Bahan + Upah + Alat 32,003.00

E.9 1M2 AcianMaterial

3.2500 Kg Portland Semen 1,550.00 5,037.50 Jumlah Bahan 5,037.50

Upah

Page 46: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 46

0.1500 OH Pekerja 36,000.00 5,400.00 0.1000 OH Tukang batu 51,000.00 5,100.00 0.0100 OH Kepala Tukang 54,000.00 540.00 0.0080 OH Mandor 48,000.00 384.00

Jumlah Upah 11,424.00

Jumlah Bahan + Upah + Alat 16,461.00

VI F PEKERJAAN K A Y UF.1 1M3 Membuat Kosen Pintu & Jendela Kayu klas I

Material 1.1000 m3 Kayu Klas I (Jati) , Balok 16,844,000.00 18,528,400.00 1.2500 Kg Paku Biasa 2" - 5 " 17,500.00 21,875.00 1.0000 Kg Lem Kayu 20,100.00 20,100.00

Jumlah Bahan 18,570,375.00 Upah

6.0000 OH Pekerja 36,000.00 216,000.00 20.0000 OH Tukang Kayu 51,000.00 1,020,000.00 2.0000 OH Kepala Tukang 54,000.00 108,000.00 0.3000 OH Mandor 48,000.00 14,400.00

Jumlah Upah 1,358,400.00

Jumlah Bahan + Upah + Alat 19,928,775.00

F.2 1M3 Membuat Kosen Pintu & Jendela Kayu BengkiraiMaterial

1.1000 m3 Kayu Bengkirai, Balok 11,250,000.00 12,375,000.00 1.2500 Kg Paku Biasa 2" - 5 " 17,500.00 21,875.00 1.0000 Kg Lem Kayu 20,100.00 20,100.00

Jumlah Bahan 12,416,975.00 Upah

6.0000 OH Pekerja 36,000.00 216,000.00 20.0000 OH Tukang Kayu 51,000.00 1,020,000.00 2.0000 OH Kepala Tukang 54,000.00 108,000.00 0.3000 OH Mandor 48,000.00 14,400.00

Jumlah Upah 1,358,400.00

Jumlah Bahan + Upah + Alat 13,775,375.00

F.3 1M2 Membuat Pintu Klamp Standard Kayu BengkiraiMaterial

0.0400 m3 Kayu Bengkirai, papan 11,250,000.00 450,000.00 0.0500 Kg Paku Biasa 2" - 5 " 17,500.00 875.00

Jumlah Bahan 450,875.00 Upah

0.3500 OH Pekerja 36,000.00 12,600.00 1.0500 OH Tukang Kayu 51,000.00 53,550.00 0.1050 OH Kepala Tukang 54,000.00 5,670.00 0.0180 OH Mandor 48,000.00 864.00

Jumlah Upah 72,684.00

Jumlah Bahan + Upah + Alat 523,559.00

Page 47: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 47

F.4 1M2 Membuat Daun Pintu Panel Kayu BengkiraiMaterial

0.0400 m3 Kayu Bengkirai, papan 11,250,000.00 450,000.00 0.0500 kg Lem Kayu 20,100.00 1,005.00

Jumlah Bahan 451,005.00 Upah

1.0000 OH Pekerja 36,000.00 36,000.00 2.5000 OH Tukang Kayu 51,000.00 127,500.00 0.2500 OH Kepala Tukang 54,000.00 13,500.00 0.0500 OH Mandor 48,000.00 2,400.00

Jumlah Upah 179,400.00

Jumlah Bahan + Upah + Alat 630,405.00

F.5 1M2 Membuat Pintu & Jendela Kaca Kayu BengkiraiMaterial

0.0350 m3 Kayu Bengkirai, papan 11,250,000.00 393,750.00 0.3000 kg Lem Kayu 20,100.00 6,030.00

Jumlah Bahan 399,780.00 Upah

0.8000 OH Pekerja 36,000.00 28,800.00 2.0000 OH Tukang Kayu 51,000.00 102,000.00 0.2000 OH Kepala Tukang 54,000.00 10,800.00 0.0400 OH Mandor 48,000.00 1,920.00

Jumlah Upah 143,520.00

Jumlah Bahan + Upah + Alat 543,300.00

F.6 1M2 Membuat Pintu & Jendela Jalusi Kayu Kelas I (Jati)Material

0.0640 m3 Kayu Kelas I (Jati), papan 16,844,000.00 1,078,016.00 0.5000 kg Lem Kayu 20,100.00 10,050.00

Jumlah Bahan 1,088,066.00 Upah

1.0000 OH Pekerja 36,000.00 36,000.00 3.0000 OH Tukang Kayu 51,000.00 153,000.00 0.3000 OH Kepala Tukang 54,000.00 16,200.00 0.3000 OH Mandor 48,000.00 14,400.00

Jumlah Upah 219,600.00

Jumlah Bahan + Upah + Alat 1,307,666.00

F.7 1M2 Membuat Pintu Plywood Rangkap rangka Kayu Bengkirai lbr s/d 90cmMaterial

0.0250 m3 Kayu Bengkirai, papan 11,250,000.00 281,250.00 0.0300 Kg Paku Biasa 1/2" - 1" 17,500.00 525.00 0.5000 Kg Lem Kayu 20,100.00 10,050.00 1.0000 Lbr Teakwood 120 x 240 tebal 4 mm 108,000.00 108,000.00

Jumlah Bahan 399,825.00 Upah

0.6000 OH Pekerja 36,000.00 21,600.00 2.0000 OH Tukang Kayu 51,000.00 102,000.00 0.2000 OH Kepala Tukang 54,000.00 10,800.00 0.0400 OH Mandor 48,000.00 1,920.00

Jumlah Upah 136,320.00

Jumlah Bahan + Upah + Alat 536,145.00

F.8 1M2 Membuat Pintu Plywood rangkap, rangka expose kayu BengkiraiMaterial

0.0256 m3 Kayu Bengkirai, papan 11,250,000.00 288,000.00 0.0300 Kg Paku Biasa 1/2" - 1" 17,500.00 525.00 0.5000 Kg Lem Kayu 20,100.00 10,050.00 1.0000 Lbr Teakwood 120 x 240 tebal 4 mm 108,000.00 108,000.00

Jumlah Bahan 406,575.00 Upah

0.8000 OH Pekerja 36,000.00 28,800.00 2.0000 OH Tukang Kayu 51,000.00 102,000.00 0.2000 OH Kepala Tukang 54,000.00 10,800.00 0.0400 OH Mandor 48,000.00 1,920.00

Jumlah Upah 143,520.00

Jumlah Bahan + Upah + Alat 550,095.00

F.9 1M2 Membuat Jalusi mati Kosen Kayu Kelas I (Jati)Material

0.0600 m3 Kayu Kelas I (Jati), papan 16,844,000.00 1,010,640.00 0.1500 Kg Paku Biasa 1/2" - 1" 17,500.00 2,625.00

Jumlah Bahan 1,013,265.00 Upah

0.5000 OH Pekerja 36,000.00 18,000.00 2.0000 OH Tukang Kayu 51,000.00 102,000.00 0.2000 OH Kepala Tukang 54,000.00 10,800.00 0.0250 OH Mandor 48,000.00 1,200.00

Jumlah Upah 132,000.00

Jumlah Bahan + Upah + Alat 1,145,265.00

F.10 1M2 Membuat Jalusi mati Kosen Kayu BengkiraiMaterial

0.0600 m3 Kayu Bengkirai, papan 11,250,000.00 675,000.00

Page 48: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 48

0.1500 Kg Paku Biasa 1/2" - 1" 17,500.00 2,625.00 Jumlah Bahan 677,625.00

Upah 0.5000 OH Pekerja 36,000.00 18,000.00 2.0000 OH Tukang Kayu 51,000.00 102,000.00 0.2000 OH Kepala Tukang 54,000.00 10,800.00 0.0250 OH Mandor 48,000.00 1,200.00

Jumlah Upah 132,000.00

Jumlah Bahan + Upah + Alat 809,625.00

F.11 1M2 Membuat Pintu Teakwood Rangkap Rangka Kayu Kelas I (jati) Material

0.0250 m3 Kayu Kelas I (Jati), papan 16,844,000.00 421,100.00 0.0300 Kg Paku Biasa 1/2" - 1" 17,500.00 525.00 0.3000 Kg Lem Kayu 20,100.00 6,030.00 1.0000 Lbr Teakwood 120 x 240 tebal 4 mm 108,000.00 108,000.00

Jumlah Bahan 535,655.00 Upah

0.8000 OH Pekerja 36,000.00 28,800.00 2.0000 OH Tukang Kayu 51,000.00 102,000.00 0.2000 OH Kepala Tukang 54,000.00 10,800.00 0.0400 OH Mandor 48,000.00 1,920.00

Jumlah Upah 143,520.00

Jumlah Bahan + Upah + Alat 679,175.00

Page 49: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 49

F.12 1M2 Membuat Pintu Teakwood Rangkap Lapis Formika Rangka ekspose Kayu Bengkirai

Material 0.0250 m3 Kayu Bengkirai, papan 11,250,000.00 281,250.00 0.0300 Kg Paku Biasa 1/2" - 1" 17,500.00 525.00 0.0800 Kg Lem Kayu 20,100.00 1,608.00 1.0000 Lbr Teakwood 120 x 240 tebal 4 mm 108,000.00 108,000.00 0.5000 Lbr Formika uk. Pintu 278,000.00 139,000.00

Jumlah Bahan 530,383.00 Upah

0.8000 OH Pekerja 36,000.00 28,800.00 2.5000 OH Tukang Kayu 51,000.00 127,500.00 0.2500 OH Kepala Tukang 54,000.00 13,500.00 0.0400 OH Mandor 48,000.00 1,920.00

Jumlah Upah 171,720.00

Jumlah Bahan + Upah + Alat 702,103.00

F.13 1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS ALUMINIUM ( KM/WC )Material

0.0150 m3 Rangka kayu bengkirai (ram pintu) 11,250,000.00 168,750.00 1.0000 lbr Triplek 4 mm 80,000.00 80,000.00 1.2000 m2 Aluminium sheet 0,3 mm 144,000.00 172,800.00 0.2000 kg Paku triplek 18,500.00 3,700.00 0.5000 kg Lem putih ( FOX ) 20,100.00 10,050.00

Jumlah Bahan 435,300.00 Upah

0.3000 org Pekerja 36,000.00 10,800.00 1.3000 org Tukang kayu 51,000.00 66,300.00 0.1300 org Kepala tukang kayu 54,000.00 7,020.00 0.0130 org Mandor 48,000.00 624.00

Jumlah Upah 84,744.00

Jumlah Bahan + Upah + Alat 520,044.00

F.14 1 M2 DAUN PINTU TRIPLEK DOUBLE UKURAN PINTU LAPIS FORMIKA ( KM/WC )Material

0.0150 m3 Rangka kayu bengkirai (ram pintu) 11,250,000.00 168,750.00 1.0000 lbr Triplek 4 mm ukuran pintu 80,000.00 80,000.00 0.5000 lbr Formika 278,000.00 139,000.00 0.2000 kg Paku triplek 18,500.00 3,700.00 0.5000 kg Lem putih ( FOX ) 20,100.00 10,050.00 0.2000 kg Lem kuning ( aica aibon ) 58,400.00 11,680.00

Jumlah Bahan 413,180.00 Upah

0.5000 org Pekerja 36,000.00 18,000.00 1.3000 org Tukang kayu 51,000.00 66,300.00 0.1300 org Kepala tukang kayu 54,000.00 7,020.00 0.0130 org Mandor 48,000.00 624.00

Jumlah Upah 91,944.00

Jumlah Bahan + Upah + Alat 505,124.00

F.15 1M3 Memasang Konstruksi Kuda-kuda Konvensional Kayu Bengkirai Bentang 6 M

Material 1.1000 m3 Kayu Bengkirai, balok 11,250,000.00 12,375,000.00 15.0000 Kg Besi Strip 17,800.00 267,000.00 0.8000 Kg Paku Biasa 2" - 5" 17,500.00 14,000.00

Jumlah Bahan 12,656,000.00 Upah

4.0000 OH Pekerja 36,000.00 144,000.00 12.0000 OH Tukang Kayu 51,000.00 612,000.00 1.2000 OH Kepala Tukang 54,000.00 64,800.00 2.0000 OH Mandor 48,000.00 96,000.00

Jumlah Upah 916,800.00

Jumlah Bahan + Upah + Alat 13,572,800.00

F.16 1M3 Memasang Konstruksi Kuda-kuda Ekspose Kayu JatiMaterial

1.1000 m3 Kayu Jati, balok 16,844,000.00 18,528,400.00 15.0000 Kg Besi Strip 17,800.00 267,000.00 5.6000 Kg Paku Biasa 2" - 5" 17,500.00 98,000.00

Jumlah Bahan 18,893,400.00 Upah

6.0000 OH Pekerja 36,000.00 216,000.00 20.0000 OH Tukang Kayu 51,000.00 1,020,000.00 2.0000 OH Kepala Tukang 54,000.00 108,000.00 0.3000 OH Mandor 48,000.00 14,400.00

Jumlah Upah 1,358,400.00

Jumlah Bahan + Upah + Alat 20,251,800.00

F.17 1M3 Memasang Konstruksi Gording Kayu BengkiraiMaterial

1.1000 m3 Kayu Bengkirai, balok 11,250,000.00 12,375,000.00 15.0000 Kg Besi Strip 17,800.00 267,000.00 3.0000 Kg Paku Biasa 2" - 5" 17,500.00 52,500.00

Page 50: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 50

Jumlah Bahan 12,694,500.00 Upah

2.4000 OH Pekerja 36,000.00 86,400.00 7.2000 OH Tukang Kayu 51,000.00 367,200.00 0.7200 OH Kepala Tukang 54,000.00 38,880.00 0.1200 OH Mandor 48,000.00 5,760.00

Jumlah Upah 498,240.00

Jumlah Bahan + Upah + Alat 13,192,740.00

Page 51: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 51

F.18 1M2 Pasang Pintu Plywood & Formika Rangka Kayu BengkiraiMaterial

0.0196 m3 Kayu Bengkirai, papan 11,250,000.00 220,500.00 0.0300 Kg Paku Biasa 1/2" - 1" 17,500.00 525.00 0.3000 Kg Lem Kayu 20,100.00 6,030.00 0.5000 Lbr Teakwood 120 x 240 tebal 4 mm 108,000.00 54,000.00 1.0000 Lbr Formika 278,000.00 278,000.00

Jumlah Bahan 559,055.00 Upah

0.8000 OH Pekerja 36,000.00 28,800.00 2.5000 OH Tukang Kayu 51,000.00 127,500.00 0.2500 OH Kepala Tukang 54,000.00 13,500.00 0.0400 OH Mandor 48,000.00 1,920.00

Jumlah Upah 171,720.00

Jumlah Bahan + Upah + Alat 730,775.00

F.19 1M2 Pasang Pintu Formika Double, Rangka Kayu Jati Material

0.0196 m3 Kayu Jati, papan 16,844,000.00 330,142.40 0.0300 Kg Paku Biasa 1/2" - 1" 17,500.00 525.00 1.2000 Kg Lem Kayu 20,100.00 24,120.00 1.0000 Lbr Teakwood 120 x 240 tebal 4 mm 108,000.00 108,000.00 1.0000 Lbr Formika 278,000.00 278,000.00

Jumlah Bahan 740,787.40 Upah

1.0000 OH Pekerja 36,000.00 36,000.00 2.6000 OH Tukang Kayu 51,000.00 132,600.00 0.2600 OH Kepala Tukang 54,000.00 14,040.00 0.0500 OH Mandor 48,000.00 2,400.00

Jumlah Upah 185,040.00

Jumlah Bahan + Upah + Alat 925,827.00

F.20 1M2 Memasang Rangka Atap Genteng Keramik, Kayu BengkiraiMaterial

0.0086 m3 Kayu Klas II (Bengkirai), Kaso-kaso (5x7) cm 11,250,000.00 96,750.00 0.0036 m3 Reng (2x3) cm 11,250,000.00 40,500.00 0.2500 Kg Paku Biasa 2" - 5" 17,500.00 4,375.00

Jumlah Bahan 141,625.00 Upah

0.1000 OH Pekerja 36,000.00 3,600.00 0.1000 OH Tukang Kayu 51,000.00 5,100.00 0.0100 OH Kepala Tukang 54,000.00 540.00 0.0050 OH Mandor 48,000.00 240.00

Jumlah Upah 9,480.00

Jumlah Bahan + Upah + Alat 151,105.00

F.21 1M2 Memasang Rangka Atap Genteng Beton, Kayu BengkiraiMaterial

0.0086 m3 Kayu Bengkirai Kaso-kaso (5x7) cm 11,250,000.00 96,750.00 0.0043 m3 Reng (2x3) cm 11,250,000.00 48,375.00 0.2500 Kg Paku Biasa 2" - 5" 17,500.00 4,375.00

Jumlah Bahan 149,500.00 Upah

0.1000 OH Pekerja 36,000.00 3,600.00 0.1000 OH Tukang Kayu 51,000.00 5,100.00 0.0100 OH Kepala Tukang 54,000.00 540.00 0.0050 OH Mandor 48,000.00 240.00

Jumlah Upah 9,480.00

Jumlah Bahan + Upah + Alat 158,980.00

F.22 1M2 Pasang Rangka Atap Sirap Kayu BengkiraiMaterial

0.1650 m3 Kayu Bengkirai, balok 11,250,000.00 1,856,250.00 0.2000 Kg Paku Biasa 2" - 5" 17,500.00 3,500.00

Jumlah Bahan 1,859,750.00 Upah

0.1200 OH Pekerja 36,000.00 4,320.00 0.1200 OH Tukang Kayu 51,000.00 6,120.00 0.0120 OH Kepala Tukang 54,000.00 648.00 0.0060 OH Mandor 48,000.00 288.00

Jumlah Upah 11,376.00

Jumlah Bahan + Upah + Alat 1,871,126.00

F.23 1M' Pasang Listplank Uk. (3x20)cm Kayu BengkiraiMaterial

0.0072 m3 Kayu Bengkirai, papan 11,250,000.00 81,000.00 0.1000 Kg Paku Biasa 2" - 5" 17,500.00 1,750.00

Jumlah Bahan 82,750.00 Upah

0.1000 OH Pekerja 36,000.00 3,600.00 0.2000 OH Tukang Kayu 51,000.00 10,200.00 0.0250 OH Kepala Tukang 54,000.00 1,350.00 0.0050 OH Mandor 48,000.00 240.00

Page 52: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 52

Jumlah Upah 15,390.00

Jumlah Bahan + Upah + Alat 98,140.00

F.24 1M' Pasang Listplank Uk. (3x30)cm Kayu BengkiraiMaterial

0.0110 m3 Kayu Bengkirai, papan 11,250,000.00 123,750.00 0.0500 Kg Paku Biasa 2" - 5" 17,500.00 875.00

Jumlah Bahan 124,625.00 Upah

0.1000 OH Pekerja 36,000.00 3,600.00 0.2000 OH Tukang Kayu 51,000.00 10,200.00 0.0200 OH Kepala Tukang 54,000.00 1,080.00 0.0050 OH Mandor 48,000.00 240.00

Jumlah Upah 15,120.00

Jumlah Bahan + Upah + Alat 139,745.00

F.25 1M' Pasang Listplank Uk. 2x(3x20)cm Kayu BengkiraiMaterial

0.0145 m3 Kayu Bengkirai, papan 11,250,000.00 163,125.00 0.1500 Kg Paku Biasa 2" - 5" 17,500.00 2,625.00

Jumlah Bahan 165,750.00 Upah

0.1500 OH Pekerja 36,000.00 5,400.00 0.2500 OH Tukang Kayu 51,000.00 12,750.00 0.0250 OH Kepala Tukang 54,000.00 1,350.00 0.0075 OH Mandor 48,000.00 360.00

Jumlah Upah 19,860.00

Jumlah Bahan + Upah + Alat 185,610.00

Page 53: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 53

F.26 1M2 Pasang Rangka Dinding Pemisah Kayu BengkiraiMaterial

0.0280 m3 Kayu Bengkirai, balok 11,250,000.00 315,000.00 0.1500 Kg Paku Biasa 2" - 5" 17,500.00 2,625.00

Jumlah Bahan 317,625.00 Upah

0.1500 OH Pekerja 36,000.00 5,400.00 0.4500 OH Tukang Kayu 51,000.00 22,950.00 0.0450 OH Kepala Tukang 54,000.00 2,430.00 0.0800 OH Mandor 48,000.00 3,840.00

Jumlah Upah 34,620.00

Jumlah Bahan + Upah + Alat 352,245.00

F.27 1M2 Pas. Dinding Pemisah Teakwood Rangkap Rangka Kayu BengkiraiMaterial

0.0280 m3 Kayu Bengkirai, balok 11,250,000.00 315,000.00 0.1500 Kg Paku Biasa 2" - 5" 17,500.00 2,625.00 0.8600 Lbr Teakwood tebal 4mm 108,000.00 92,880.00 0.5600 Kg Lem kayu 20,100.00 11,256.00

Jumlah Bahan 421,761.00 Upah

0.1500 OH Pekerja 36,000.00 5,400.00 0.4500 OH Tukang Kayu 51,000.00 22,950.00 0.0450 OH Kepala Tukang 54,000.00 2,430.00 0.0080 OH Mandor 48,000.00 384.00

Jumlah Upah 31,164.00

Jumlah Bahan + Upah + Alat 452,925.00

F.28 1M2 Pasang Dinding Lambriziring dari Papan jati Material

0.0070 m3 Kayu Jati, balok 16,844,000.00 117,908.00 0.1000 Kg Paku Biasa 2" - 5" 17,500.00 1,750.00 0.1500 Kg Paku Sekrup 3,5" 25,100.00 3,765.00

Jumlah Bahan 123,423.00 Upah

0.6000 OH Pekerja 36,000.00 21,600.00 1.8000 OH Tukang Kayu 51,000.00 91,800.00 0.1800 OH Kepala Tukang 54,000.00 9,720.00 0.0300 OH Mandor 48,000.00 1,440.00

Jumlah Upah 124,560.00

Jumlah Bahan + Upah + Alat 247,983.00

F.29 1M2 Pasang Plywood tebal 4mm unt DindingMaterial

0.4000 Lbr Teakwood 10x240 tebal 4mm 108,000.00 43,200.00 0.5000 Kg Paku Biasa 1/4" - 1" 18,500.00 9,250.00

Jumlah Bahan 52,450.00 Upah

0.0250 OH Pekerja 36,000.00 900.00 0.0750 OH Tukang Kayu 51,000.00 3,825.00 0.0075 OH Kepala Tukang 54,000.00 405.00 0.0013 OH Mandor 48,000.00 62.40

Jumlah Upah 5,192.40

Jumlah Bahan + Upah + Alat 57,642.00

F.30 1M2 Pasang Dinding Bilik, Rangka Kayu Klas III / IVMaterial

1.5000 m2 Bambu diameter 6-8 / 600 cm 18,800.00 28,200.00 0.0140 m3 Kayu Klas Meranti (balok/pesagen) 3,609,000.00 50,526.00 0.0500 Kg Paku Biasa 1/4" - 1" 18,500.00 925.00 0.0030 m' List Kayu profil 8,400.00 25.20

Jumlah Bahan 79,676.20 Upah

0.1000 OH Pekerja 36,000.00 3,600.00 0.0500 OH Tukang Kayu 51,000.00 2,550.00 0.0050 OH Kepala Tukang 54,000.00 270.00 0.0050 OH Mandor 48,000.00 240.00

Jumlah Upah 6,660.00

Jumlah Bahan + Upah + Alat 86,336.00

VII G PEKERJAAN PERKERASAN DAN BETON

G.1 1M3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87Material

247.0000 Kg Portland Semen 1,750.00 432,250.00 0.6207 m3 Pasir Beton (Cepu) 250,000.00 155,178.57 0.7400 m3 Batu pecah 1/2 274,000.00 202,760.00

Jumlah Bahan 790,188.57 Upah

1.6500 OH Pekerja 36,000.00 59,400.00 0.2750 OH Tukang Batu 51,000.00 14,025.00 0.0280 OH Kepala Tukang 54,000.00 1,512.00 0.0830 OH Mandor 48,000.00 3,984.00

Page 54: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 54

Jumlah Upah 78,921.00

Jumlah Bahan + Upah + Alat 869,109.00

G.2 1M3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78Material

276.0000 Kg Portland Semen 1,750.00 483,000.00 0.5914 m3 Pasir Beton (Cepu) 250,000.00 147,850.00 0.7496 m3 Batu pecah 1/2 274,000.00 205,390.40

Jumlah Bahan 836,240.40 Upah

1.6500 OH Pekerja 36,000.00 84,150.00 0.2750 OH Tukang Batu 51,000.00 14,850.00 0.0280 OH Kepala Tukang 54,000.00 1,344.00 0.0830 OH Mandor 48,000.00 3,984.00

Jumlah Upah 104,328.00

Jumlah Bahan + Upah + Alat 940,568.00

G.3 1M3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72Material

299.0000 Kg Portland Semen 1,750.00 523,250.00 0.5707 m3 Pasir Beton (Cepu) 250,000.00 142,675.00 0.7533 m3 Batu pecah 1/2 274,000.00 206,404.20

Jumlah Bahan 872,329.20 Upah

1.6500 OH Pekerja 36,000.00 59,400.00 0.2750 OH Tukang Batu 51,000.00 14,025.00 0.0280 OH Kepala Tukang 54,000.00 1,512.00 0.0830 OH Mandor 48,000.00 3,984.00

Jumlah Upah 78,921.00

Jumlah Bahan + Upah + Alat 951,250.00

Page 55: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 55

G.4 1M3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87Material

230.0000 Kg Portland Semen 1,750.00 402,500.00 0.6379 m3 Pasir Beton (Cepu) 250,000.00 159,475.00 0.7607 m3 Batu pecah 1/2 274,000.00 208,431.80

Jumlah Bahan 770,406.80 Upah

1.2000 OH Pekerja 36,000.00 43,200.00 0.2000 OH Tukang Batu 51,000.00 10,200.00 0.0200 OH Kepala Tukang 54,000.00 1,080.00 0.0060 OH Mandor 48,000.00 288.00

Jumlah Upah 54,768.00

Jumlah Bahan + Upah + Alat 825,174.00

G.5 1M3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66Material

326.0000 Kg Portland Semen 1,750.00 570,500.00 0.5429 m3 Pasir Beton (Cepu) 250,000.00 135,725.00 0.7622 m3 Batu pecah 1/2 274,000.00 208,842.80

Jumlah Bahan 915,067.80 Upah

1.6500 OH Pekerja 36,000.00 59,400.00 0.2500 OH Tukang Batu 51,000.00 12,750.00 0.0250 OH Kepala Tukang 54,000.00 1,350.00 0.0800 OH Mandor 48,000.00 3,840.00

Jumlah Upah 77,340.00

Jumlah Bahan + Upah + Alat 992,407.00

G.6 1M3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm,w/c = 0,61Material

352.0000 Kg Portland Semen 1,750.00 616,000.00 0.5221 m3 Pasir Beton (Muntilan) 355,000.00 185,345.50 0.7637 m3 Batu pecah 1/2 274,000.00 209,253.80

Jumlah Bahan 1,010,599.30 Upah

1.6500 OH Pekerja 36,000.00 59,400.00 0.2500 OH Tukang Batu 51,000.00 12,750.00 0.0250 OH Kepala Tukang 54,000.00 1,350.00 0.0800 OH Mandor 48,000.00 3,840.00

Jumlah Upah 77,340.00

Jumlah Bahan + Upah + Alat 1,087,939.00

G.7 1M3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58Material

371.0000 Kg Portland Semen 1,750.00 649,250.00 0.4986 m3 Pasir Beton (Muntilan) 355,000.00 177,003.00 0.7756 m3 Batu pecah 1/2 274,000.00 212,514.40

Jumlah Bahan 1,038,767.40 Upah

1.6500 OH Pekerja 36,000.00 59,400.00 0.2500 OH Tukang Batu 51,000.00 12,750.00 0.0250 OH Kepala Tukang 54,000.00 1,350.00 0.0800 OH Mandor 48,000.00 3,840.00

Jumlah Upah 77,340.00

Jumlah Bahan + Upah + Alat 1,116,107.00

G.8 1M3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm,w/c = 0,56Material

384.0000 Kg Portland Semen 1,750.00 672,000.00 0.4943 m3 Pasir Beton (Muntilan) 355,000.00 175,476.50 0.7696 m3 Batu pecah 1/2 274,000.00 210,870.40

Jumlah Bahan 1,058,346.90 Upah

1.6500 OH Pekerja 36,000.00 59,400.00 0.2500 OH Tukang Batu 51,000.00 12,750.00 0.0250 OH Kepala Tukang 54,000.00 1,350.00 0.0800 OH Mandor 48,000.00 3,840.00

Jumlah Upah 77,340.00

Jumlah Bahan + Upah + Alat 1,135,686.00

G.9 1M3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53Material

406.0000 Kg Portland Semen 1,750.00 710,500.00 0.4886 m3 Pasir Beton (Muntilan) 355,000.00 173,453.00 0.7600 m3 Batu pecah 1/2 274,000.00 208,240.00

Jumlah Bahan 1,092,193.00 Upah

1.6500 OH Pekerja 36,000.00 59,400.00 0.2500 OH Tukang Batu 51,000.00 12,750.00 0.0250 OH Kepala Tukang 54,000.00 1,350.00 0.0800 OH Mandor 48,000.00 3,840.00

Jumlah Upah 77,340.00

Jumlah Bahan + Upah + Alat 1,169,533.00

Page 56: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 56

G.10 1M3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm,w/c = 0,52Material

413.0000 Kg Portland Semen 1,750.00 722,750.00 0.4864 m3 Pasir Beton (Muntilan) 355,000.00 172,672.00 0.7563 m3 Batu pecah 1/2 274,000.00 207,226.20

Jumlah Bahan 1,102,648.20 Upah

1.6500 OH Pekerja 36,000.00 59,400.00 0.2500 OH Tukang Batu 51,000.00 12,750.00 0.0250 OH Kepala Tukang 54,000.00 1,350.00 0.0800 OH Mandor 48,000.00 3,840.00

Jumlah Upah 77,340.00

Jumlah Bahan + Upah + Alat 1,179,988.00

G.11 1M3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm,w/c = 0,49Material

439.0000 Kg Portland Semen 1,750.00 768,250.00 0.4786 m3 Pasir Beton (Muntilan) 355,000.00 169,903.00 0.7452 m3 Batu pecah 1/2 274,000.00 204,184.80

Jumlah Bahan 1,142,337.80 Upah

2.1000 OH Pekerja 36,000.00 75,600.00 0.3500 OH Tukang Batu 51,000.00 17,850.00 0.0350 OH Kepala Tukang 54,000.00 1,890.00 0.1050 OH Mandor 48,000.00 5,040.00

Jumlah Upah 100,380.00

Jumlah Bahan + Upah + Alat 1,242,717.00

Page 57: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 57

G.12 1M3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48Material

448.0000 Kg Portland Semen 1,750.00 784,000.00 0.4764 m3 Pasir Beton (Muntilan) 355,000.00 169,122.00 0.7407 m3 Batu pecah 1/2 274,000.00 202,951.80

Jumlah Bahan 1,156,073.80 Upah

2.1000 OH Pekerja 36,000.00 75,600.00 0.3500 OH Tukang Batu 51,000.00 17,850.00 0.0350 OH Kepala Tukang 54,000.00 1,890.00 0.1050 OH Mandor 48,000.00 5,040.00

Jumlah Upah 100,380.00

Jumlah Bahan + Upah + Alat 1,256,453.00

G.13 1KG Pembesian dg Besi PolosMaterial

1.0500 Kg Besi Beton (polos) 12,200.00 12,810.00 0.0150 Kg Kawat Beton 20,000.00 300.00

Jumlah Bahan 13,110.00 Upah

0.0070 OH Pekerja 36,000.00 252.00 0.0070 OH Tukang Besi 51,000.00 357.00 0.0007 OH Kepala Tukang 54,000.00 37.80 0.0004 OH Mandor 48,000.00 19.20

Jumlah Upah 666.00

a = Jumlah Bahan + Upah + Alat 13,776.00

G.13a 110 KG Besi Beton Terpasang (polos) a x 110 1,515,360.00

G.13b 125 KG Besi Beton Terpasang (polos) a x 125 1,722,000.00

G.14 1KG Kabel Presstresed Polos/strandMaterial

1.0500 Kg Besi presstred polos 20,400.00 21,420.00 0.0100 Kg Kawat Beton 20,000.00 200.00

Jumlah Bahan 21,620.00 Upah

0.0050 OH Pekerja 36,000.00 180.00 0.0050 OH Tukang Besi 51,000.00 255.00 0.0005 OH Kepala Tukang 54,000.00 27.00 0.0003 OH Mandor 48,000.00 14.40

Jumlah Upah 476.40

Jumlah Bahan + Upah + Alat 22,096.00

G.15 1M2 Pasang Bekisting untuk Pondasi Material

0.0400 m3 Kayu Perancah 2,269,000.00 90,760.00 0.3000 Kg Paku Biasa 1" - 4" 17,500.00 5,250.00 0.1000 Ltr Minyak Bekisting 24,200.00 2,420.00

Jumlah Bahan 98,430.00 Upah

0.5200 OH Pekerja 36,000.00 18,720.00 0.2600 OH Tukang Kayu 51,000.00 13,260.00 0.0260 OH Kepala Tukang 54,000.00 1,404.00 0.0260 OH Mandor 48,000.00 1,248.00

Jumlah Upah 34,632.00

Jumlah Bahan + Upah + Alat 133,062.00

G.15a 1M2 Pasang Bekisting untuk Sloof, Ringbalk, Kolom, Balok Lantai dengan PapanMaterial

0.3996 m3 Kayu Perancah 2,269,000.00 906,692.40 0.4000 Kg Paku Biasa 1" - 4" 17,500.00 7,000.00

Jumlah Bahan 913,692.40 Upah

0.3000 OH Pekerja 36,000.00 10,800.00 0.5000 OH Tukang Kayu 51,000.00 25,500.00 0.0500 OH Kepala Tukang 54,000.00 2,700.00 0.0100 OH Mandor 48,000.00 480.00

Jumlah Upah 39,480.00

Jumlah Bahan + Upah + Alat 953,172.00 G.16 1M2 Pasang Bekisting untuk Sloof

Material 0.0450 m3 Kayu Perancah 2,269,000.00 102,105.00 0.3000 Kg Paku Biasa 1" - 4" 17,500.00 5,250.00 0.1000 Ltr Minyak Bekisting 24,200.00 2,420.00

Jumlah Bahan 109,775.00 Upah

0.5200 OH Pekerja 36,000.00 18,720.00 0.2600 OH Tukang Kayu 51,000.00 13,260.00 0.0260 OH Kepala Tukang 54,000.00 1,404.00 0.0260 OH Mandor 48,000.00 1,248.00

Jumlah Upah 34,632.00

Jumlah Bahan + Upah + Alat 144,407.00

Page 58: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 58

G.17 1M2 Pasang Bekisting untuk KolomMaterial

0.0400 m3 Kayu Perancah 2,269,000.00 90,760.00 0.4000 Kg Paku Biasa 1" - 4" 17,500.00 7,000.00 0.2000 Ltr Minyak Bekisting 24,200.00 4,840.00 0.0150 m3 Kayu meranti (balok/pesagen) 3,609,000.00 54,135.00 0.3500 Lbr Multipleks 120 x240 tb. 9 mm 148,700.00 52,045.00 2.0000 Btg Dolken sengon diameter 8 - 10 cm / 4 m 39,000.00 78,000.00

Jumlah Bahan 286,780.00 Upah

0.6600 OH Pekerja 36,000.00 23,760.00 0.3300 OH Tukang Kayu 51,000.00 16,830.00 0.0330 OH Kepala Tukang 54,000.00 1,782.00 0.0330 OH Mandor 48,000.00 1,584.00

Jumlah Upah 43,956.00

Jumlah Bahan + Upah + Alat 330,736.00

G.18 1M2 Pasang Bekisting untuk BalokMaterial

0.0400 m3 Kayu Perancah 2,269,000.00 90,760.00 0.4000 Kg Paku Biasa 1" - 4" 17,500.00 7,000.00 0.2000 Ltr Minyak Bekisting 24,200.00 4,840.00 0.0180 m3 Kayu meranti (balok/pesagen) 3,609,000.00 64,962.00 0.3500 Lbr Multipleks 120 x240 tb. 9 mm 148,700.00 52,045.00 2.0000 Btg Dolken sengon diameter 8 - 10 cm / 4 m 39,000.00 78,000.00

Jumlah Bahan 297,607.00 Upah

0.6600 OH Pekerja 36,000.00 23,760.00 0.3300 OH Tukang Kayu 51,000.00 16,830.00 0.0330 OH Kepala Tukang 54,000.00 1,782.00 0.0330 OH Mandor 48,000.00 1,584.00

Jumlah Upah 43,956.00

Jumlah Bahan + Upah + Alat 341,563.00

Page 59: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 59

G.19 1M2 Pasang Bekisting untuk LantaiMaterial

0.0400 m3 Kayu Perancah 2,269,000.00 90,760.00 0.4000 Kg Paku Biasa 1" - 4" 17,500.00 7,000.00 0.2000 Ltr Minyak Bekisting 24,200.00 4,840.00 0.0150 m3 Kayu meranti (balok/pesagen) 3,609,000.00 54,135.00 0.3500 Lbr Multipleks 120 x240 tb. 9 mm 148,700.00 52,045.00 6.0000 Btg Dolken sengon diameter 8 - 10 cm / 4 m 39,000.00 234,000.00

Jumlah Bahan 442,780.00 Upah

0.6600 OH Pekerja 36,000.00 23,760.00 0.3300 OH Tukang Kayu 51,000.00 16,830.00 0.0330 OH Kepala Tukang 54,000.00 1,782.00 0.0330 OH Mandor 48,000.00 1,584.00

Jumlah Upah 43,956.00

Jumlah Bahan + Upah + Alat 486,736.00

G.20 1M2 Pasang Bekisting untuk DindingMaterial

0.0300 m3 Kayu Perancah 2,269,000.00 68,070.00 0.4000 Kg Paku Biasa 1" - 4" 17,500.00 7,000.00 0.2000 Ltr Minyak Bekisting 24,200.00 4,840.00 0.0200 m3 Kayu meranti (balok/pesagen) 3,609,000.00 72,180.00 0.3500 Lbr Multipleks 120 x240 tb. 9 mm 148,700.00 52,045.00 3.0000 Btg Dolken sengon diameter 8 - 10 cm / 4 m 39,000.00 117,000.00

Jumlah Bahan 321,135.00 Upah

0.6600 OH Pekerja 36,000.00 23,760.00 0.3300 OH Tukang Kayu 51,000.00 16,830.00 0.0330 OH Kepala Tukang 54,000.00 1,782.00 0.0330 OH Mandor 48,000.00 1,584.00

Jumlah Upah 43,956.00 Alat

4.0000 lot Alat bantu (set @ 3 alat ) 15,100.00 60,400.00 Jumlah Alat 60,400.00

Jumlah Bahan + Upah + Alat 425,491.00

G.21 1M2 Pasang Bekisting untuk TanggaMaterial

0.0300 m3 Kayu Perancah 2,269,000.00 68,070.00 0.4000 Kg Paku Biasa 1" - 4" 17,500.00 7,000.00 0.1500 Ltr Minyak Bekisting 24,200.00 3,630.00 0.0150 m3 Kayu meranti (balok/pesagen) 3,609,000.00 54,135.00 0.3500 Lbr Multipleks 120 x240 tb. 9 mm 148,700.00 52,045.00 2.0000 Btg Dolken sengon diameter 8 - 10 cm / 4 m 39,000.00 78,000.00

Jumlah Bahan 262,880.00 Upah

0.6600 OH Pekerja 36,000.00 23,760.00 0.3300 OH Tukang Kayu 51,000.00 16,830.00 0.0330 OH Kepala Tukang 54,000.00 1,782.00 0.0330 OH Mandor 48,000.00 1,584.00

Jumlah Upah 43,956.00

Jumlah Bahan + Upah + Alat 306,836.00

G.22 1 M2 Pasang Bekisting Jembatan CorMaterial

0.0264 m3 Kayu Perancah 2,269,000.00 59,901.60 0.6000 Kg Paku Biasa 1" - 4" 17,500.00 10,500.00 0.5000 Btg Dolken sengon diameter 8 - 10 cm / 4 m 39,000.00 19,500.00

Jumlah Bahan 89,901.60 Upah

0.1500 OH Pekerja 36,000.00 5,400.00 0.0500 OH Tukang Kayu 51,000.00 2,550.00 0.0050 OH Kepala Tukang 54,000.00 270.00 0.0080 OH Mandor 48,000.00 384.00

Jumlah Upah 8,604.00

Jumlah Bahan + Upah + Alat 98,505.00

G.23 1 M2 BEKESTING DENGAN PAPANMaterial

0.0170 m3 Kaso lanan 5/7 (2x pakai) 50 % 3,609,000.00 61,353.00 0.0240 m3 Kayu Perancah 2,269,000.00 54,456.00 0.4000 kg Paku Biasa 1" - 4" 17,500.00 7,000.00

Jumlah Bahan 122,809.00 Upah

0.3000 org Pekerja 36,000.00 10,800.00 0.1500 org Tukang kayu 51,000.00 7,650.00 0.1500 org Kepala tukang kayu 54,000.00 8,100.00 0.0500 org Mandor 48,000.00 2,400.00

Jumlah Upah 28,950.00

Jumlah Bahan + Upah + Alat 151,759.00

G.24 1 M2 BEKESTING DENGAN MULTIPLEX 9 MMMaterial

0.0170 m3 Kaso lanan 5/7 (2x pakai) 50 % 3,609,000.00 61,353.00 0.3470 lbr Multiplex 9 mm (2x pakai) 75 % 148,700.00 51,598.90 0.4000 kg Paku 17,500.00 7,000.00

Jumlah Bahan 119,951.90 Upah

0.1200 org Pekerja 36,000.00 4,320.00 0.1500 org Tukang kayu 51,000.00 7,650.00 0.1500 org Kepala tukang kayu 54,000.00 8,100.00 0.0500 org Mandor 48,000.00 2,400.00

Page 60: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 60

Jumlah Upah 22,470.00

Jumlah Bahan + Upah + Alat 142,421.00

G.25 1 M3 Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)Material

0.2000 m3 Kayu Perancah 2,269,000.00 453,800.00 1.5000 Kg Paku Biasa 1" - 4" 17,500.00 26,250.00 0.4000 Ltr Minyak Bekisting 24,200.00 9,680.00 157.5000 Kg Besi Beton Polos 12,200.00 1,921,500.00 2.2500 Kg Kawat Beton 20,000.00 45,000.00 336.0000 Kg Portland Semen 1,550.00 520,800.00 0.5400 m3 Pasir Beton (Cepu) 250,000.00 135,000.00 0.8100 m3 Batu pecah 1/2 274,000.00 221,940.00

Jumlah Bahan 3,333,970.00 Upah

5.3000 OH Pekerja 36,000.00 190,800.00 0.2750 OH Tukang batu 51,000.00 14,025.00 1.3000 OH Tukang Kayu 51,000.00 66,300.00 1.0500 OH Tukang Besi 51,000.00 53,550.00 0.2620 OH Kepala Tukang 54,000.00 14,148.00 0.2650 OH Mandor 48,000.00 12,720.00

Jumlah Upah 351,543.00

Jumlah Bahan + Upah + Alat 3,685,513.00

Page 61: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 61

G.26 1 M3 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)Material

0.2700 m3 Kayu Perancah 2,269,000.00 612,630.00 2.0000 Kg Paku Biasa 1" - 4" 17,500.00 35,000.00 0.6000 Ltr Minyak Bekisting 24,200.00 14,520.00 210.0000 Kg Besi Beton Polos 12,200.00 2,562,000.00 3.0000 Kg Kawat Beton 20,000.00 60,000.00 336.0000 Kg Portland Semen 1,550.00 520,800.00 0.5400 m3 Pasir Beton (Cepu) 250,000.00 135,000.00 0.8100 m3 Batu pecah 1/2 274,000.00 221,940.00

Jumlah Bahan 4,161,890.00 Upah

5.6500 OH Pekerja 36,000.00 203,400.00 0.2750 OH Tukang batu 51,000.00 14,025.00 1.5600 OH Tukang Kayu 51,000.00 79,560.00 1.4000 OH Tukang Besi 51,000.00 71,400.00 0.3230 OH Kepala Tukang 54,000.00 17,442.00 0.2830 OH Mandor 48,000.00 13,584.00

Jumlah Upah 399,411.00

Jumlah Bahan + Upah + Alat 4,561,301.00

G.27 1 M3 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)Material

0.4000 m3 Kayu Perancah 2,269,000.00 907,600.00 4.0000 Kg Paku Biasa 1" - 4" 17,500.00 70,000.00 2.0000 Ltr Minyak Bekisting 24,200.00 48,400.00 315.0000 Kg Besi Beton Polos 12,200.00 3,843,000.00 4.5000 Kg Kawat Beton 20,000.00 90,000.00 336.0000 Kg Portland Semen 1,550.00 520,800.00 0.5400 m3 Pasir Beton (Cepu) 250,000.00 135,000.00 0.8100 m3 Batu pecah 1/2 274,000.00 221,940.00 0.1500 m3 Kayu Meranti (balok/pesagen) 3,609,000.00 541,350.00 3.5000 Lbr Multipleks 120 x 240 tb. 9 mm 148,700.00 520,450.00 20.0000 Btg Dolken sengon diameter 8 / 4mm 39,000.00 780,000.00

Jumlah Bahan 7,678,540.00 Upah

7.0500 OH Pekerja 36,000.00 253,800.00 0.2750 OH Tukang batu 51,000.00 14,025.00 1.6500 OH Tukang Kayu 51,000.00 84,150.00 2.1000 OH Tukang Besi 51,000.00 107,100.00 0.4030 OH Kepala Tukang 54,000.00 21,762.00 0.3530 OH Mandor 48,000.00 16,944.00

Jumlah Upah 497,781.00

Jumlah Bahan + Upah + Alat 8,176,321.00

G.28 1 M3 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)Material

0.3200 m3 Kayu Perancah 2,269,000.00 726,080.00 3.2000 Kg Paku Biasa 1" - 4" 17,500.00 56,000.00 1.6000 Ltr Minyak Bekisting 24,200.00 38,720.00 210.0000 Kg Besi Beton Polos 12,200.00 2,562,000.00 3.0000 Kg Kawat Beton 20,000.00 60,000.00 336.0000 Kg Portland Semen 1,550.00 520,800.00 0.5400 m3 Pasir Beton (Cepu) 250,000.00 135,000.00 0.8100 m3 Batu pecah 1/2 274,000.00 221,940.00 0.1400 m3 Kayu Meranti (balok/pesagen) 3,609,000.00 505,260.00 2.8000 Lbr Multipleks 120 x 240 tb. 9 mm 148,700.00 416,360.00 18.0000 Btg Dolken sengon diameter 8 / 4mm 39,000.00 702,000.00

Jumlah Bahan 5,944,160.00 Upah

6.3500 OH Pekerja 36,000.00 228,600.00 0.2750 OH Tukang batu 51,000.00 14,025.00 1.6500 OH Tukang Kayu 51,000.00 84,150.00 1.4000 OH Tukang Besi 51,000.00 71,400.00 0.3330 OH Kepala Tukang 54,000.00 17,982.00 0.3180 OH Mandor 48,000.00 15,264.00

Jumlah Upah 431,421.00

Jumlah Bahan + Upah + Alat 6,375,581.00

G.29 1 M3 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)Material

0.3200 m3 Kayu Perancah 2,269,000.00 726,080.00 3.2000 Kg Paku Biasa 1" - 4" 17,500.00 56,000.00 1.6000 Ltr Minyak Bekisting 24,200.00 38,720.00 157.5000 Kg Besi Beton Polos 12,200.00 1,921,500.00 2.2500 Kg Kawat Beton 20,000.00 45,000.00 336.0000 Kg Portland Semen 1,550.00 520,800.00 0.5400 m3 Pasir Beton (Cepu) 250,000.00 135,000.00 0.8100 m3 Batu pecah 1/2 274,000.00 221,940.00 0.1200 m3 Kayu Meranti (balok/pesagen) 3,609,000.00 433,080.00 2.8000 Lbr Multipleks 120 x 240 tb. 9 mm 148,700.00 416,360.00 32.0000 Btg Dolken sengon diameter 8 / 4mm 39,000.00 1,248,000.00

Jumlah Bahan 5,762,480.00 Upah

Page 62: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 62

5.3000 OH Pekerja 36,000.00 190,800.00 0.2750 OH Tukang batu 51,000.00 14,025.00 1.3000 OH Tukang Kayu 51,000.00 66,300.00 1.0500 OH Tukang Besi 51,000.00 53,550.00 0.2650 OH Kepala Tukang 54,000.00 14,310.00 0.2650 OH Mandor 48,000.00 12,720.00

Jumlah Upah 351,705.00

Jumlah Bahan + Upah + Alat 6,114,185.00

Page 63: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 63

G.30 1 M3 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)Material

0.2400 m3 Kayu Perancah 2,269,000.00 544,560.00 3.2000 Kg Paku Biasa 1" - 4" 17,500.00 56,000.00 1.6000 Ltr Minyak Bekisting 24,200.00 38,720.00 157.5000 Kg Besi Beton Polos 12,200.00 1,921,500.00 2.2500 Kg Kawat Beton 20,000.00 45,000.00 336.0000 Kg Portland Semen 1,550.00 520,800.00 0.5400 m3 Pasir Beton (Cepu) 250,000.00 135,000.00 0.8100 m3 Batu pecah 1/2 274,000.00 221,940.00 0.1600 m3 Kayu Meranti (balok/pesagen) 3,609,000.00 577,440.00 2.8000 Lbr Multipleks 120 x 240 tb. 9 mm 148,700.00 416,360.00 24.0000 Btg Dolken sengon diameter 8 / 4mm 39,000.00 936,000.00

Jumlah Bahan 5,413,320.00 Upah

5.3000 OH Pekerja 36,000.00 190,800.00 0.2750 OH Tukang batu 51,000.00 14,025.00 1.3000 OH Tukang Kayu 51,000.00 66,300.00 1.0500 OH Tukang Besi 51,000.00 53,550.00 0.2620 OH Kepala Tukang 54,000.00 14,148.00 0.2650 OH Mandor 48,000.00 12,720.00

Jumlah Upah 351,543.00

Jumlah Bahan + Upah + Alat 5,764,863.00

G.31 1 M3 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)Material

0.2500 m3 Kayu Perancah 2,269,000.00 567,250.00 3.0000 Kg Paku Biasa 1" - 4" 17,500.00 52,500.00 1.2000 Ltr Minyak Bekisting 24,200.00 29,040.00 210.0000 Kg Besi Beton Polos 12,200.00 2,562,000.00 3.0000 Kg Kawat Beton 20,000.00 60,000.00 336.0000 Kg Portland Semen 1,550.00 520,800.00 0.5400 m3 Pasir Beton (Cepu) 250,000.00 135,000.00 0.8100 m3 Batu pecah 1/2 274,000.00 221,940.00 0.1050 m3 Kayu Meranti (balok/pesagen) 3,609,000.00 378,945.00 2.5000 Lbr Multipleks 120 x 240 tb. 9 mm 148,700.00 371,750.00 14.0000 Btg Dolken sengon diameter 8 / 4mm 39,000.00 546,000.00

Jumlah Bahan 5,445,225.00 Upah

5.6500 OH Pekerja 36,000.00 203,400.00 0.2750 OH Tukang batu 51,000.00 14,025.00 1.5600 OH Tukang Kayu 51,000.00 79,560.00 1.4000 OH Tukang Besi 51,000.00 71,400.00 0.3230 OH Kepala Tukang 54,000.00 17,442.00 0.2830 OH Mandor 48,000.00 13,584.00

Jumlah Upah 399,411.00

Jumlah Bahan + Upah + Alat 5,844,636.00

G.32 1 M' Membuat Kolom Penguat Beton Bertulang (11 x 11) cmMaterial

0.0020 m3 Kayu Perancah 2,269,000.00 4,538.00 0.0100 Kg Paku Biasa 1" - 4" 17,500.00 175.00 3.0000 Kg Besi Beton Polos 12,200.00 36,600.00 0.4500 Kg Kawat Beton 20,000.00 9,000.00 4.0000 Kg Portland Semen 1,550.00 6,200.00 0.0060 Kg Pasir Beton (Cepu) 250,000.00 1,500.00 0.0090 m3 Batu pecah 1/2 274,000.00 2,466.00

Jumlah Bahan 60,479.00 Upah

0.1800 OH Pekerja 36,000.00 6,480.00 0.0200 OH Tukang batu 51,000.00 1,020.00 0.0200 OH Tukang Kayu 51,000.00 1,020.00 0.0200 OH Tukang Besi 51,000.00 1,020.00 0.0060 OH Kepala Tukang 54,000.00 324.00 0.0090 OH Mandor 48,000.00 432.00

Jumlah Upah 10,296.00

Jumlah Bahan + Upah + Alat 70,775.00

G.33 1 M' Membuat Ring Balok Beton Bertulang (10 x 15) cmMaterial

0.0030 m3 Kayu Perancah 2,269,000.00 6,807.00 0.0200 Kg Paku Biasa 1" - 4" 17,500.00 350.00 3.6000 Kg Besi Beton Polos 12,200.00 43,920.00 0.0500 Kg Kawat Beton 20,000.00 1,000.00 5.5000 Kg Portland Semen 1,550.00 8,525.00 0.0090 Kg Pasir Beton (Cepu) 250,000.00 2,250.00 0.0150 m3 Batu pecah 1/2 274,000.00 4,110.00

Jumlah Bahan 66,962.00 Upah

0.2970 OH Pekerja 36,000.00 10,692.00 0.0330 OH Tukang batu 51,000.00 1,683.00 0.0330 OH Tukang Kayu 51,000.00 1,683.00 0.0330 OH Tukang Besi 51,000.00 1,683.00

Page 64: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 64

0.0100 OH Kepala Tukang 54,000.00 540.00 0.0050 OH Mandor 48,000.00 240.00

Jumlah Upah 16,521.00

Jumlah Bahan + Upah + Alat 83,483.00

G.34 1 M3 PAS. BETON K-175 READY MIX 6 M3 BERIKUT SLANGMaterial

1.0000 m3 Adukan K-175 Ready Mix 975,000.00 975,000.00 Jumlah Bahan 975,000.00

Upah 2.5000 org Pekerja 36,000.00 90,000.00 0.2500 org Tukang batu 51,000.00 12,750.00 0.1000 org Kepala tukang batu 54,000.00 5,400.00 0.0100 org Mandor 48,000.00 480.00

Jumlah Upah 108,630.00 Alat

0.0450 lot Alat bantu (Slang + Tes Lab.) 15,100.00 679.50 Jumlah Alat 679.50

Jumlah Bahan + Upah + Alat 1,084,309.00

Page 65: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 65

G.35 1 M3 PAS. BETON K-225 READY MIX 6 M3 BERIKUT SLANGMaterial

1.0000 m3 Adukan K-225 Ready Mix 1,037,500.00 1,037,500.00 Jumlah Bahan 1,037,500.00

Upah 2.5000 org Pekerja 36,000.00 90,000.00 0.2500 org Tukang batu 51,000.00 12,750.00 0.1000 org Kepala tukang batu 54,000.00 5,400.00 0.0100 org Mandor 48,000.00 480.00

Jumlah Upah 108,630.00 Alat

0.0450 lot Alat bantu (Slang + Tes Lab.) 15,100.00 679.50 Jumlah Alat 679.50

Jumlah Bahan + Upah + Alat 1,146,809.00

G.36 1 M3 PAS. BETON K-300 READY MIX 6 M3 BERIKUT SLANGMaterial

1.0000 m3 Adukan K-300 Ready Mix 1,125,000.00 1,125,000.00 Jumlah Bahan 1,125,000.00

Upah 2.5000 org Pekerja 36,000.00 90,000.00 0.2500 org Tukang batu 51,000.00 12,750.00 0.1000 org Kepala tukang batu 54,000.00 5,400.00 0.0100 org Mandor 48,000.00 480.00

Jumlah Upah 108,630.00 Alat

0.0450 lot Alat bantu (Slang + Tes Lab.) 15,100.00 679.50 Jumlah Alat 679.50

Jumlah Bahan + Upah + Alat 1,234,309.00

G.37 1 KG PEK. ERECTION KONST. KUDA-KUDA BESI Material

0.0002 ls Sewa alat (Crane) 700,000.00 140.00 0.0100 lt Solar (minyak diesel) 4,500.00 45.00 0.0010 lt Olie (Minyak Pelumas) 22,000.00 22.00

Jumlah Bahan 207.00

0.0010 org Pekerja 36,000.00 36.00 0.0010 org Tukang besi profil 51,000.00 51.00 0.0002 org Kepala tukang besi profil 51,000.00 10.20 0.0001 org Mandor 48,000.00 4.80 0.0002 org Operator terlatih 51,000.00 10.20 0.0200 org Pembantu operator 42,000.00 840.00

Jumlah Upah 952.20 Alat

0.0002 lot Alat bantu 15,100.00 3.02 Jumlah Alat 3.02

Jumlah Bahan + Upah + Alat 1,162.00

G.38 1 KG PEKERJAAN BAJA IWFMaterial

1.1000 kg Besi IWF 21,300.00 23,430.00 0.1250 lot Peralatan (oksigen,solar,elpiji,kawat las) 150,000.00 18,750.00

Jumlah Bahan 42,180.00 Upah

0.0600 org Pekerja 36,000.00 2,160.00 0.0300 org Tukang besi profil 51,000.00 1,530.00 0.0150 org Kepala tukang besi 54,000.00 810.00 0.0075 org Mandor 48,000.00 360.00

Jumlah Upah 4,860.00

Jumlah Bahan + Upah + Alat 47,040.00

G.39 1 KG PEKERJAAN KONSTUKSI BESI SIKU / PROFILMaterial

1.1000 kg Besi profil/besi siku 20,400.00 22,440.00 0.1250 lot Peralatan (oksigen,solar,elpiji,kawat las) 165,000.00 20,625.00

Jumlah Bahan 43,065.00 Upah

0.0600 org Pekerja 36,000.00 2,160.00 0.0300 org Tukang besi profil 51,000.00 1,530.00 0.0150 org Kepala tukang besi profil 54,000.00 810.00 0.0075 org Mandor 48,000.00 360.00

Jumlah Upah 4,860.00

Jumlah Bahan + Upah + Alat 47,925.00

G.40 1 CM PEK. PENGELASAN DENGAN LAS LISTRIK TEBAL KAWAT 4 MMAlat + BBM 0.0400 kg Kawat las listrik 36,300.00 1,452.00 0.0300 lt Solar (minyak diesel) 4,500.00 135.00 0.0040 lt Olie (Minyak Pelumas) 22,000.00 88.00 0.2500 ls Sewa Alat 100,000.00 25,000.00

Jumlah Bahan 26,675.00 Upah

0.0100 org Pekerja 36,000.00 360.00

Page 66: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 66

0.0050 org Tukang besi profil 51,000.00 255.00 0.0050 org Kepala tukang besi profil 54,000.00 270.00 0.0025 org Mandor 48,000.00 120.00

Jumlah Upah 1,005.00

Jumlah Bahan + Upah + Alat 27,680.00

G.41 1 TITIK MELUBANG KONSTRUKSI BESI DENGAN BORMaterial

0.0500 org Pekerja 36,000.00 1,800.00 0.0200 org Tukang besi profil 51,000.00 1,020.00 0.0030 org Kepala tukang besi profil 54,000.00 162.00 0.0010 org Mandor 48,000.00 48.00

Jumlah Upah 3,030.00 Alat

0.2500 lot Sewa Alat 100,000.00 25,000.00 Jumlah Alat 25,000.00

Jumlah Bahan + Upah + Alat 28,030.00

G.42 1 M2 PEKERJAAN WIREMESH M8Material

1.0100 m2 Wiremesh M8 80,000.00 80,800.00 0.1000 kg Kawat las listrik 36,300.00 3,630.00

Jumlah Bahan 84,430.00 Upah

0.1000 org Pekerja 36,000.00 3,600.00 0.0750 org Tukang besi profil 51,000.00 3,825.00 0.0100 org Mandor 48,000.00 480.00

Jumlah Upah 7,905.00

Jumlah Bahan + Upah + Alat 92,335.00

VIII H PEKERJAAN PENUTUP ATAP

H.1 1 M2 Pasang Atap Genteng Mantili KecilMaterial

25.0000 Buah Genteng mantili kecil 1,300.00 32,500.00 Jumlah Bahan 32,500.00

Upah 0.1500 OH Pekerja 36,000.00 5,400.00 0.0750 OH Tukang Kayu 51,000.00 3,825.00 0.0080 OH Kepala Tukang 54,000.00 432.00 0.0080 OH Mandor 48,000.00 384.00

Jumlah Upah 10,041.00

Jumlah Bahan + Upah + Alat 42,541.00

Page 67: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 67

H.2 1 M2 Pasang Atap Genteng Mantili BesarMaterial

20.0000 Buah Genteng Mantili Besar 1,500.00 30,000.00 Jumlah Bahan 30,000.00

Upah 0.1500 OH Pekerja 36,000.00 5,400.00 0.0600 OH Tukang Kayu 51,000.00 3,060.00 0.0060 OH Kepala Tukang 54,000.00 324.00 0.0080 OH Mandor 48,000.00 384.00

Jumlah Upah 9,168.00

Jumlah Bahan + Upah + Alat 39,168.00

H.3 1 M' Pasang Genteng Bubung MantiliMaterial

5.0000 Buah Genteng Bubung Mantili 3,500.00 17,500.00 8.0000 Kg Portland Semen 1,550.00 12,400.00 0.0320 m3 Pasir Pasang 230,000.00 7,360.00

Jumlah Bahan 37,260.00 Upah

0.4000 OH Pekerja 36,000.00 14,400.00 0.2000 OH Tukang Batu 51,000.00 10,200.00 0.0200 OH Kepala Tukang 54,000.00 1,080.00 0.0020 OH Mandor 48,000.00 96.00

Jumlah Upah 25,776.00

Jumlah Bahan + Upah + Alat 63,036.00

H.4 1 M2 Pasang Atap Asbes Gelombang (80 x 210 cm) x 5 mmMaterial

0.6000 Lbr Asbes Gelombang (80 x 120) cm 50,000.00 30,000.00 0.1200 Kg Paku Payung 28,600.00 3,432.00

Jumlah Bahan 33,432.00 Upah

0.1400 OH Pekerja 36,000.00 5,040.00 0.0750 OH Tukang Kayu 51,000.00 3,825.00 0.0080 OH Kepala Tukang 54,000.00 432.00 0.0080 OH Mandor 48,000.00 384.00

Jumlah Upah 9,681.00

Jumlah Bahan + Upah + Alat 43,113.00

H.5 1 M2 Pasang Atap Genteng BetonMaterial

11.0000 bh Genteng Beton Standrad 4,800.00 52,800.00 0.0300 Kg Paku Biasa 1" - 4" 17,500.00 525.00

Jumlah Bahan 53,325.00 Upah

0.2000 OH Pekerja 36,000.00 7,200.00 0.1000 OH Tukang Kayu 51,000.00 5,100.00 0.0100 OH Kepala Tukang 54,000.00 540.00 0.0100 OH Mandor 48,000.00 480.00

Jumlah Upah 13,320.00

Jumlah Bahan + Upah + Alat 66,645.00

H.6 1 M2 Pasang Atap SirapMaterial

60.0000 Lbr Genteng Sirap 6,900.00 414,000.00 0.2000 Kg Paku Biasa 1/4" - 1" 18,500.00 3,700.00

Jumlah Bahan 417,700.00 Upah

0.1660 OH Pekerja 36,000.00 5,976.00 0.2500 OH Tukang Kayu 51,000.00 12,750.00 0.0250 OH Kepala Tukang 54,000.00 1,350.00 0.0080 OH Mandor 48,000.00 384.00

Jumlah Upah 20,460.00

Jumlah Bahan + Upah + Alat 438,160.00

H.7 1 M' Pasang Bubungan BetonMaterial

3.5000 Buah Genteng Kerpus Beton 10,000.00 35,000.00 0.0500 Kg Paku Biasa 1" - 4" 17,500.00 875.00 10.8000 Kg Portland Semen 1,550.00 16,740.00 0.0320 m3 Pasir Pasang 230,000.00 7,360.00

Jumlah Bahan 59,975.00 Upah

0.4000 OH Pekerja 36,000.00 14,400.00 0.2000 OH Tukang Batu 51,000.00 10,200.00 0.0200 OH Kepala Tukang 54,000.00 1,080.00 0.0200 OH Mandor 48,000.00 960.00

Jumlah Upah 26,640.00

Jumlah Bahan + Upah + Alat 86,615.00

H.8 1 M' Pasang Bubungan SirapMaterial

0.4000 Lbr Seng Talang BJLS 26 lebar 0.60 25,800.00 10,320.00 0.0600 Kg Paku Biasa 1/4" - 1" 18,500.00 1,110.00 0.5000 Kg Paku Biasa 1" - 4" 17,500.00 8,750.00

Page 68: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 68

0.0040 m3 Kayu Bengkirai Papan Tebal 3 cm 11,250,000.00 45,000.00 Jumlah Bahan 65,180.00

Upah 0.1250 OH Pekerja 36,000.00 4,500.00 0.2500 OH Tukang Kayu 51,000.00 12,750.00 0.0250 OH Kepala Tukang 54,000.00 1,350.00 0.0060 OH Mandor 48,000.00 288.00

Jumlah Upah 18,888.00

Jumlah Bahan + Upah + Alat 84,068.00

H.9 1 M2 Pasang Atap Seng Gelombang BJLS 28Material

0.7000 Lbr Seng gelombang BJLS 0.28 panjang 180 cm 60,000.00 42,000.00 0.0200 Kg Paku Biasa 1/4" - 1" 18,500.00 370.00

Jumlah Bahan 42,370.00 Upah

0.1200 OH Pekerja 36,000.00 4,320.00 0.0600 OH Tukang Kayu 51,000.00 3,060.00 0.0060 OH Kepala Tukang 54,000.00 324.00 0.0060 OH Mandor 48,000.00 288.00

Jumlah Upah 7,992.00

Jumlah Bahan + Upah + Alat 50,362.00

Page 69: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 69

H.10 1 M' Pasang Bubungan SengMaterial

0.3000 Lbr Seng gelombang BJLS 0.30 panjang 180 cm 60,300.00 18,090.00 0.0400 Kg Paku Biasa 1/4" - 1" 18,500.00 740.00

Jumlah Bahan 18,830.00 Upah

0.1500 OH Pekerja 36,000.00 5,400.00 0.0700 OH Tukang Kayu 51,000.00 3,570.00 0.0080 OH Kepala Tukang 54,000.00 432.00 0.0060 OH Mandor 48,000.00 288.00

Jumlah Upah 9,690.00

Jumlah Bahan + Upah + Alat 28,520.00

IX I PEKERJAAN LANGIT - LANGIT

I.1 1 M2 Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mmMaterial

1.1000 Lbr Plat Asbes 100 x 100 cm tebal 5 mm 21,000.00 23,100.00 0.0100 Kg Paku Biasa 1/4" - 1" 18,500.00 185.00

Jumlah Bahan 23,285.00 Upah

0.0300 OH Pekerja 36,000.00 1,080.00 0.0700 OH Tukang Kayu 51,000.00 3,570.00 0.0070 OH Kepala Tukang 54,000.00 378.00 0.0020 OH Mandor 48,000.00 96.00

Jumlah Upah 5,124.00

Jumlah Bahan + Upah + Alat 28,409.00

I.2 1 M2 Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm

Material 0.3750 Lbr Tripleks 120 x 240 tb. 4 mm 80,000.00 30,000.00 0.0300 Kg Paku Biasa 1/4" - 1" 18,500.00 555.00

Jumlah Bahan 30,555.00 Upah

0.0700 OH Pekerja 36,000.00 2,520.00 0.1000 OH Tukang Kayu 51,000.00 5,100.00 0.0100 OH Kepala Tukang 54,000.00 540.00 0.0040 OH Mandor 48,000.00 192.00

Jumlah Upah 8,352.00

Jumlah Bahan + Upah + Alat 38,907.00

I.3 1 M2 Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mmMaterial

0.0150 m3 Kayu Jati,Papan 16,844,000.00 252,660.00 0.0100 Kg Paku Biasa 1/4" - 1" 18,500.00 185.00

Jumlah Bahan 252,845.00 Upah

0.6000 OH Pekerja 36,000.00 21,600.00 0.8000 OH Tukang Kayu 51,000.00 40,800.00 0.0800 OH Kepala Tukang 54,000.00 4,320.00 0.0300 OH Mandor 48,000.00 1,440.00

Jumlah Upah 68,160.00

Jumlah Bahan + Upah + Alat 321,005.00

I.4 1 M2 Langit-langit Gypsum Board, tebal 9 mmMaterial

0.3640 Lbr Gypsum 9 mm 66,000.00 24,024.00 0.1100 Kg Paku Sekrup 25,100.00 2,761.00

Jumlah Bahan 26,785.00 Upah

0.1000 OH Pekerja 36,000.00 3,600.00 0.0500 OH Tukang Kayu 51,000.00 2,550.00 0.0050 OH Kepala Tukang 54,000.00 270.00 0.0050 OH Mandor 48,000.00 240.00

Jumlah Upah 6,660.00

Jumlah Bahan + Upah + Alat 33,445.00

I.5 1 M' List Langit-Langit Kayu ProfilMaterial

1.0500 m1 List Kayu Profil 8,400.00 8,820.00 0.0100 Kg Paku Biasa 1/4" - 1" 18,500.00 185.00

Jumlah Bahan 9,005.00 Upah

0.0500 OH Pekerja 36,000.00 1,800.00 0.0500 OH Tukang Kayu 51,000.00 2,550.00 0.0050 OH Kepala Tukang 54,000.00 270.00 0.0030 OH Mandor 48,000.00 144.00

Jumlah Upah 4,764.00

Jumlah Bahan + Upah + Alat 13,769.00

I.6 1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu BengkiraiMaterial

0.0154 m3 Kayu Bengkirai, balok 11,250,000.00 173,250.00 0.2000 Kg Paku Biasa 1" - 4" 17,500.00 3,500.00

Page 70: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 70

Jumlah Bahan 176,750.00 Upah

0.1500 OH Pekerja 36,000.00 5,400.00 0.2500 OH Tukang Kayu 51,000.00 12,750.00 0.0250 OH Kepala Tukang 54,000.00 1,350.00 0.0750 OH Mandor 48,000.00 3,600.00

Jumlah Upah 23,100.00

Jumlah Bahan + Upah + Alat 199,850.00

I.6a 1M2 Pasang Rangka Langit-langit (1,00x1,00) m, kayu KruingMaterial

0.0084 m3 Kayu Kruing, balok 8,000,000.00 67,200.00 0.2000 Kg Paku Biasa 1" - 4" 17,500.00 3,500.00

Jumlah Bahan 70,700.00 Upah

0.1500 OH Pekerja 36,000.00 5,400.00 0.2500 OH Tukang Kayu 51,000.00 12,750.00 0.0250 OH Kepala Tukang 54,000.00 1,350.00 0.0750 OH Mandor 48,000.00 3,600.00

Jumlah Upah 23,100.00

Jumlah Bahan + Upah + Alat 93,800.00

I.7 1M2 Pasang Rangka Langit-langit (60x60) cm, kayu BengkiraiMaterial

0.0163 m3 Kayu Bengkirai, balok 11,250,000.00 183,375.00 0.2500 Kg Paku Biasa 1" - 4" 17,500.00 4,375.00

Jumlah Bahan 187,750.00 Upah

0.2000 OH Pekerja 36,000.00 7,200.00 0.3000 OH Tukang Kayu 51,000.00 15,300.00 0.0300 OH Kepala Tukang 54,000.00 1,620.00 0.0100 OH Mandor 48,000.00 480.00

Jumlah Upah 24,600.00

Jumlah Bahan + Upah + Alat 212,350.00

X J PEKERJAAN SANITASI, JALAN DAN SALURANJ.1 1 UNIT Memasang Closet Duduk Porselin

Material 1.0000 Buah Kloset Duduk 643,000.00 643,000.00

Jumlah Bahan 643,000.00 Upah

3.3000 OH Pekerja 36,000.00 118,800.00 1.1000 OH Tukang Batu 51,000.00 56,100.00 0.0010 OH Kepala Tukang 54,000.00 54.00 0.1600 OH Mandor 48,000.00 7,680.00

Jumlah Upah 182,634.00

Jumlah Bahan + Upah + Alat 825,634.00

Page 71: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 71

J.2 1 UNIT Memasang Closet Jongkok Material

1.0000 Buah Kloset Jongkok 136,000.00 136,000.00 6.0000 Kg Portland Semen 1,550.00 9,300.00 0.0100 m3 Pasir Pasang 230,000.00 2,300.00

Jumlah Bahan 147,600.00 Upah

1.0000 OH Pekerja 36,000.00 36,000.00 1.5000 OH Tukang Batu 51,000.00 76,500.00 1.5000 OH Kepala Tukang 54,000.00 81,000.00 0.1600 OH Mandor 48,000.00 7,680.00

Jumlah Upah 201,180.00

Jumlah Bahan + Upah + Alat 348,780.00

J.3 1 UNIT Memasang WastafelMaterial

1.0000 Buah Wastafel 552,000.00 552,000.00 0.3000 - Perlengkapan 30% Harga Wastafel 552,000.00 165,600.00 6.0000 Kg Portland Semen 1,550.00 9,300.00 0.0100 m3 Pasir Pasang 230,000.00 2,300.00

Jumlah Bahan 729,200.00 Upah

1.2000 OH Pekerja 36,000.00 43,200.00 0.1450 OH Tukang Batu 51,000.00 7,395.00 0.1500 OH Kepala Tukang 54,000.00 8,100.00 0.1000 OH Mandor 48,000.00 4,800.00

Jumlah Upah 63,495.00

Jumlah Bahan + Upah + Alat 792,695.00

J.4 1 M' Memasang Pipa Beton, Ø 15 cm - 20 cmMaterial

1.1000 Buah Pipa Beton 43,000.00 47,300.00 0.0270 m3 Batu Bata 500.00 13.50 0.6800 Kg Portland Semen 1,550.00 1,054.00 0.0560 m3 Pasir Pasang 230,000.00 12,880.00 0.0240 m3 Pasir Urug 68,000.00 1,632.00

Jumlah Bahan 62,879.50 Upah

0.1400 OH Pekerja 36,000.00 5,040.00 0.0700 OH Tukang Batu 51,000.00 3,570.00 0.0070 OH Kepala Tukang 54,000.00 378.00 0.0070 OH Mandor 48,000.00 336.00

Jumlah Upah 9,324.00

Jumlah Bahan + Upah + Alat 72,203.00

J.5 1 M' Memasang Pipa Beton, Ø 30 cm - 100 cmMaterial

1.1000 Buah Pipa Beton 76,000.00 83,600.00 0.5500 m3 Batu Bata 500.00 275.00 10.3000 Kg Portland Semen 1,550.00 15,965.00 0.0610 m3 Pasir Pasang 230,000.00 14,030.00 0.0690 m3 Pasir Urug 68,000.00 4,692.00

Jumlah Bahan 118,562.00 Upah

0.3800 OH Pekerja 36,000.00 13,680.00 0.1900 OH Tukang Batu 51,000.00 9,690.00 0.0190 OH Kepala Tukang 54,000.00 1,026.00 0.0190 OH Mandor 48,000.00 912.00

Jumlah Upah 25,308.00

Jumlah Bahan + Upah + Alat

J.6 1 M' Memasang Pipa PVC type AW Ø ½"Material

1.0100 m' Pipa PVC 6,400.00 6,464.00 0.3500 Perlengkapan 35% Harga Pipa 6,400.00 2,240.00

Jumlah Bahan 8,704.00 Upah

0.0360 OH Pekerja 36,000.00 1,296.00 0.0600 OH Tukang Ledeng 51,000.00 3,060.00 0.0060 OH Kepala Tukang 54,000.00 324.00 0.0018 OH Mandor 48,000.00 86.40

Jumlah Upah 4,766.40

Jumlah Bahan + Upah + Alat 13,470.00

J.7 1 M' MEMASANG PIPA PVC type AW Ø 3/4"Material

1.0100 m' Pipa PVC 7,600.00 7,676.00 0.3500 Perlengkapan 35% Harga Pipa 7,600.00 2,660.00

Jumlah Bahan 10,336.00 Upah

0.0396 OH Pekerja 36,000.00 1,425.60 0.0660 OH Tukang Ledeng 51,000.00 3,366.00 0.0066 OH Kepala Tukang 54,000.00 356.40 0.0020 OH Mandor 48,000.00 96.00

Jumlah Upah 5,244.00

Page 72: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 72

Jumlah Bahan + Upah + Alat 15,580.00

J.8 1 M' MEMASANG PIPA type AW PVC Ø 1"Material

1.0100 m' Pipa PVC 9,500.00 9,595.00 0.3500 Perlengkapan 35% Harga Pipa 9,500.00 3,325.00

Jumlah Bahan 12,920.00 Upah

0.0432 OH Pekerja 36,000.00 1,555.20 0.0720 OH Tukang Ledeng 51,000.00 3,672.00 0.0072 OH Kepala Tukang 54,000.00 388.80 0.0022 OH Mandor 48,000.00 105.60

Jumlah Upah 5,721.60

Jumlah Bahan + Upah + Alat 18,641.00

J.9 1 M' MEMASANG PIPA PVC type AW Ø 11/4"Material

1.0100 m' Pipa PVC 16,100.00 16,261.00 0.3500 Perlengkapan 35% Harga Pipa 16,100.00 5,635.00

Jumlah Bahan 21,896.00 Upah

0.0468 OH Pekerja 36,000.00 1,684.80 0.0780 OH Tukang Ledeng 51,000.00 3,978.00 0.0078 OH Kepala Tukang 54,000.00 421.20 0.0023 OH Mandor 48,000.00 110.40

Jumlah Upah 6,194.40

Jumlah Bahan + Upah + Alat 28,090.00

Page 73: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 73

J.10 1 M' MEMASANG PIPA PVC type AW Ø 11/2"Material

1.0100 m' Pipa PVC 17,600.00 17,776.00 0.3500 Perlengkapan 35% Harga Pipa 17,600.00 6,160.00

Jumlah Bahan 23,936.00 Upah

0.0504 OH Pekerja 36,000.00 1,814.40 0.0840 OH Tukang Ledeng 51,000.00 4,284.00 0.0084 OH Kepala Tukang 54,000.00 453.60 0.0025 OH Mandor 48,000.00 120.00

Jumlah Upah 6,672.00

Jumlah Bahan + Upah + Alat 30,608.00

J.11 1 M' Memasang Pipa PVC type AW Ø 2"Material

1.0100 m' Pipa PVC 25,900.00 26,159.00 0.3500 Perlengkapan 35% Harga Pipa 25,900.00 9,065.00

Jumlah Bahan 35,224.00 Upah

0.0540 OH Pekerja 36,000.00 1,944.00 0.0900 OH Tukang Ledeng 51,000.00 4,590.00 0.0090 OH Kepala Tukang 54,000.00 486.00 0.0027 OH Mandor 48,000.00 129.60

Jumlah Upah 7,149.60

Jumlah Bahan + Upah + Alat 42,373.00

J.12 1 M' MEMASANG PIPA PVC type AW Ø 21/2"Material

1.0100 m' Pipa PVC 33,000.00 33,330.00 0.3500 Perlengkapan 35% Harga Pipa 33,000.00 11,550.00

Jumlah Bahan 44,880.00 Upah

0.0675 OH Pekerja 36,000.00 2,430.00 0.1125 OH Tukang Ledeng 51,000.00 5,737.50 0.0113 OH Kepala Tukang 54,000.00 610.20 0.0034 OH Mandor 48,000.00 163.20

Jumlah Upah 8,940.90

Jumlah Bahan + Upah + Alat 53,820.00

J.13 1 M' Memasang Pipa PVC type AW Ø 3"Material

1.0100 m' Pipa PVC 47,900.00 48,379.00 0.3500 Perlengkapan 35% Harga Pipa 47,900.00 16,765.00

Jumlah Bahan 65,144.00 Upah

0.0810 OH Pekerja 36,000.00 2,916.00 0.1350 OH Tukang Ledeng 51,000.00 6,885.00 0.0135 OH Kepala Tukang 54,000.00 729.00 0.0041 OH Mandor 48,000.00 196.80

Jumlah Upah 10,726.80

Jumlah Bahan + Upah + Alat 75,870.00

J.14 1 M' Pasangan Pipa PVC 1"Material

0.0600 Galian Tanah (B.1) 16,320.00 979.20 0.0100 Urugan Tanah (B.9a) 11,280.00 112.80

Jumlah Bahan 1,092.00 Upah

0.0400 OH Tukang Ledeng 51,000.00 2,040.00 0.0600 OH Pekerja 36,000.00 2,160.00 0.0600 OH Mandor 48,000.00 2,880.00

Jumlah Upah 7,080.00 Alat

0.0010 lot Alat Bantu 15,100.00 15.10 Jumlah Alat 15.10

Jumlah Bahan + Upah + Alat 8,187.00

J.15 1 M' Pasangan Pipa PVC 1 1/4"Material

0.1200 Galian Tanah (B.1) 16,320.00 1,958.40 0.0200 Urugan Tanah (B.9a) 11,280.00 225.60

Jumlah Bahan 2,184.00 Upah

0.1700 OH Tukang Pipa 51,000.00 8,670.00 0.0700 OH Pekerja 36,000.00 2,520.00 0.0100 OH Mandor 48,000.00 480.00

Jumlah Upah 11,670.00 Alat

0.0020 lot Alat Bantu 15,100.00 30.20 Jumlah Alat 30.20

Jumlah Bahan + Upah + Alat 13,884.00

J.16 1 M' Pasangan Pipa PVC 1 1/2"Material

0.2000 Galian Tanah (B.1) 16,320.00 3,264.00

m³m³

m³m³

Page 74: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 74

0.1000 Urugan Tanah (B.9a) 11,280.00 1,128.00 Jumlah Bahan 4,392.00

Upah 0.0650 OH Tukang Pipa 51,000.00 3,315.00 0.1950 OH Pekerja 36,000.00 7,020.00 0.0090 OH Mandor 48,000.00 432.00

Jumlah Upah 10,767.00 Alat

0.0250 lot Alat Bantu 15,100.00 377.50 Jumlah Alat 377.50

Jumlah Bahan + Upah + Alat 15,536.00

J.17 1 M' Pasangan Pipa PVC 2"Material

0.1200 Galian Tanah (B.1) 16,320.00 1,958.40 0.0300 Urugan Tanah (B.9a) 11,280.00 338.40

Jumlah Bahan 2,296.80 Upah

0.2000 OH Tukang Pipa 51,000.00 10,200.00 0.0900 OH Pekerja 36,000.00 3,240.00 0.0150 OH Mandor 48,000.00 720.00

Jumlah Upah 14,160.00 Alat

0.0030 lot Alat Bantu 15,100.00 45.30 Jumlah Alat 45.30

Jumlah Bahan + Upah + Alat 16,502.00

J.18Material

0.4000 Galian Tanah (B.1) 16,320.00 6,528.00 0.1110 Urugan Pasir (B.9) 92,880.00 10,309.68 0.2800 Urugan Tanah (B.9a) 11,280.00 3,158.40

Jumlah Bahan 19,996.08 Alat

0.0500 lot Alat Bantu 15,100.00 755.00 Jumlah Alat 755.00

Upah 0.2550 OH Pekerja 36,000.00 9,180.00 0.0080 OH Kepala Tukang 54,000.00 432.00 0.0850 OH Tukang Ledeng 51,000.00 4,335.00 0.0120 OH Mandor 48,000.00 576.00

Jumlah Upah 14,523.00

Jumlah Bahan + Upah + Alat 35,274.00

J.19Material

0.5600 Galian Tanah (B.1) 16,320.00 9,139.20 0.1370 Urugan Pasir (B.9) 92,880.00 12,724.56 0.3150 Urugan Tanah (B.9a) 11,280.00 3,553.20

Jumlah Bahan 25,416.96 Alat

0.0750 lot Alat Bantu 15,100.00 1,132.50 Jumlah Alat 1,132.50

Upah 0.4000 OH Pekerja 36,000.00 14,400.00 0.0300 OH Kepala Tukang 54,000.00 1,620.00 0.1350 OH Tukang Ledeng 51,000.00 6,885.00 0.0200 OH Mandor 48,000.00 960.00

Jumlah Upah 23,865.00

Jumlah Bahan + Upah + Alat 50,414.00

J.20 1 M2 PASANG PAVING BLOK 6 CM K : 300Material

1.0100 m2 Paving blok 6 Holand cm K : 300 (ALDAS) 97,500.00 98,475.00 0.1000 m3 Pasir pasang 230,000.00 23,000.00

Jumlah Bahan 121,475.00 Upah

0.2000 Org Pekerja 36,000.00 7,200.00 0.3000 Org Tukang batu 51,000.00 15,300.00 0.0300 Org Kepala tukang batu 54,000.00 1,620.00 0.0250 Org Mandor 48,000.00 1,200.00

Jumlah Upah 25,320.00 Alat

0.0500 lot Peralatan 15,100.00 755.00 Jumlah Alat 755.00

Jumlah Bahan + Upah + Alat 147,550.00

J.21 1 M2 PASANG PAVING BLOK 6 CM K : 175Material

1.0100 m2 Paving blok Holand 6 cm K : 175 (lokal) 62,500.00 63,125.00 0.1000 m3 Pasir pasang 230,000.00 23,000.00

Jumlah Bahan 86,125.00 Upah

0.2000 Org Pekerja 36,000.00 7,200.00

m³m³

1 M' Pasangan Pipa PVC Ø 4"

m³m³m³

1 M' Pasangan Pipa PVC Ø 6"

m³m³m³

Page 75: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 75

0.3000 Org Tukang batu 51,000.00 15,300.00 0.0300 Org Kepala tukang batu 54,000.00 1,620.00 0.0250 Org Mandor 48,000.00 1,200.00

Jumlah Upah 25,320.00 Alat

0.0500 lot Peralatan 15,100.00 755.00 Jumlah Alat 755.00

Jumlah Bahan + Upah + Alat 112,200.00

J.22 1 M2 PASANG PAVING BLOK 8 CM K ; 300Material

1.0100 m2 Paving blok Holand 8 cm K : 300 (ALDAS) 133,000.00 134,330.00 0.1000 m3 Pasir pasang 230,000.00 23,000.00

Jumlah Bahan 157,330.00 Upah

0.2000 Org Pekerja 36,000.00 7,200.00 0.3000 Org Tukang batu 51,000.00 15,300.00 0.0300 Org Kepala tukang batu 54,000.00 1,620.00 0.0250 Org Mandor 48,000.00 1,200.00

Jumlah Upah 25,320.00 Alat

0.0500 lot Peralatan 15,100.00 755.00 Jumlah Alat 755.00

Jumlah Bahan + Upah + Alat 183,405.00

J.23 1 M2 PASANG PAVING BLOK 8 CM K: 175Material

1.0100 m2 Paving blok Holand 8 cm K : 175 75,000.00 75,750.00 0.1000 m3 Pasir pasang 230,000.00 23,000.00

Jumlah Bahan 98,750.00 Upah

0.2000 Org Pekerja 36,000.00 7,200.00 0.3000 Org Tukang batu 51,000.00 15,300.00 0.0300 Org Kepala tukang batu 54,000.00 1,620.00 0.0250 Org Mandor 48,000.00 1,200.00

Jumlah Upah 25,320.00 Alat

0.0500 lot Peralatan 15,100.00 755.00 Jumlah Alat 755.00

Jumlah Bahan + Upah + Alat 124,825.00

J.24 1 M2 PASANGAN PAVING BLOK WARNA 6 CM K: 175Material

1.0100 m2 Paving blok warna 6 cm K : 175 65,000.00 65,650.00 0.1000 m3 Pasir pasang 230,000.00 23,000.00

Jumlah Bahan 88,650.00 Upah

0.2000 Org Pekerja 36,000.00 7,200.00 0.3000 Org Tukang batu 51,000.00 15,300.00 0.0300 Org Kepala tukang batu 54,000.00 1,620.00 0.0250 Org Mandor 48,000.00 1,200.00

Jumlah Upah 25,320.00 Alat

0.0500 lot Peralatan 15,100.00 755.00 Jumlah Alat 755.00

Jumlah Bahan + Upah + Alat 114,725.00

J.25 1 M2 PASANGAN PAVING BLOK WARNA 6 CM K: 250Material

1.0100 m2 Paving blok warna 6 cm K : 250(NUSA JAYA) 96,875.00 97,843.75 0.1000 m3 Pasir pasang 230,000.00 23,000.00

Jumlah Bahan 120,843.75 Upah

0.2000 Org Pekerja 36,000.00 7,200.00 0.3000 Org Tukang batu 51,000.00 15,300.00 0.0300 Org Kepala tukang batu 54,000.00 1,620.00 0.0250 Org Mandor 48,000.00 1,200.00

Jumlah Upah 25,320.00 Alat

0.0500 lot Peralatan 15,100.00 755.00 Jumlah Alat 755.00

Jumlah Bahan + Upah + Alat 146,918.00

Page 76: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 76

J.26 1 M2 PASANGAN PAVING BLOK WARNA 8 CM K: 175Material

1.0100 m2 Paving blok warna 8 cm K : 175 77,500.00 78,275.00 0.1000 m3 Pasir pasang 230,000.00 23,000.00

Jumlah Bahan 101,275.00 Upah

0.2000 Org Pekerja 36,000.00 7,200.00 0.3000 Org Tukang batu 51,000.00 15,300.00 0.0300 Org Kepala tukang batu 54,000.00 1,620.00 0.0250 Org Mandor 48,000.00 1,200.00

Jumlah Upah 25,320.00 Alat

0.0500 lot Peralatan 15,100.00 755.00 Jumlah Alat 755.00

Jumlah Bahan + Upah + Alat 127,350.00

J.27 1 M2 LAPISAN PENGISI / PENUTUP DENGAN ASPAL PANAS TEBAL 3 CMMaterial

0.0300 m3 Batu pecah mesin 2/3 272,000.00 8,160.00 0.0140 m3 Batu pecah mesin 1/2 274,000.00 3,836.00 0.0050 m3 Batu pecah mesin 0.5/1 287,000.00 1,435.00 3.0000 kg Aspal Bitumen 12,000.00 36,000.00 0.0050 m3 Kayu bakar 107,000.00 535.00

Jumlah Bahan 49,966.00 Upah

0.1000 org Pekerja 36,000.00 3,600.00 0.0050 org Mandor 48,000.00 240.00

Jumlah Upah 3,840.00 Alat

0.0025 hr Sewa walls 150,000.00 375.00 0.0180 lot Peralatan 15,100.00 271.80

Jumlah Alat 646.80

Jumlah Bahan + Upah + Alat 54,452.00

J.28 MENGGILAS JALAN 1 HARI DIPERLUKAN Upah

1.0000 org Operator terlatih 51,000.00 51,000.00 1.0000 org Pembantu Operator 42,000.00 42,000.00 1.0000 org Penjaga 36,000.00 36,000.00 6.0000 org Pekerja 36,000.00 216,000.00

Jumlah Upah 345,000.00 Alat

20.0000 ltr Solar 4,500.00 90,000.00 0.5000 ltr Oli Sae 40 22,000.00 11,000.00 0.5000 ltr Oli Sae 50 22,000.00 11,000.00 0.5000 ltr Oli Sae 140 22,000.00 11,000.00 0.2500 ltr Stenveet 22,100.00 5,525.00

hari Pemeliharaan Alat 50,000.00 Jumlah Alat 178,525.00

Jumlah Bahan + Upah + Alat 523,525.00

1 Bulan dihitung 25 hari menggilas

a = 25.0000 hari 13,088,125.00

J.28a MENGGILAS 1 M2 LAPIS KULIT PENAHAN a x 2 / 7.500 3,490.00

J.28b MENGGILAS 1 M2 LAPIS KULIT PERTEGARAN a x 1 / 7.500 1,745.00

J.28c MENGGILAS LAPIS AUS ( PENETRASI ) a x 2/25000 1,047.00

J.28d MENGGILAS RINGAN 1 M2 OPERPENTING a x 0,25/25000 130.00

J.29 100 M2 PENGASPALAN SHEET (LATASIR) TEBAL 1 CM JERENGMaterial

125.0000 kg Aspal bitumen 12,000.00 1,500,000.00 1.0000 m3 Abu batu 232,000.00 232,000.00 0.9000 m3 Kayu bakar 107,000.00 96,300.00

Jumlah Bahan 1,828,300.00 Upah

0.4000 org Mandor 48,000.00 19,200.00 8.3500 org Pekerja 36,000.00 300,600.00

Jumlah Upah 319,800.00

Jumlah Bahan + Upah + Alat 2,148,100.00

J.30 1M2 ASPAL SAND SHEET TEBAL 2 CM JERENG ( 1 CM PADAT ) Material

0.0200 m 100 m2 Pengaspalan Sand sheet tebal 1 cm jereng 2,148,100.00 42,962.00 0.5000 x Aspal bitumen 12,000.00 6,000.00

Jumlah Bahan 48,962.00 Upah

1.0000 m2 Menggilas Lapis Aus (penetrasi) 1,047.00 1,047.00 0.0050 hr Sewa Walls 150,000.00 750.00

Jumlah Bahan 1,797.00

Jumlah Bahan + Upah + Alat 50,759.00

J.31 1M2 ASPAL SAND SHEET TEBAL 3 CM JERENG ( 2 CM PADAT ) Material

Page 77: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 77

0.0300 m 100 m2 Pengaspalan Sand sheet tebal 1 cm jereng 2,148,100.00 64,443.00 0.5000 x Aspal bitumen 12,000.00 6,000.00

Jumlah Bahan 70,443.00 Upah

1.0000 m2 Menggilas Lapis Aus (penetrasi) 1,047.00 1,047.00 0.0050 hr Sewa Walls 150,000.00 750.00

Jumlah Bahan 1,797.00

Jumlah Bahan + Upah + Alat 72,240.00

J.32 1 M3 PASIR DIBAWAH ALAS JALAN TIAP 1 M3 LAPIS PASIRMaterial

1.2000 kg Pasir Urug (timbunan) 68,000.00 81,600.00 Jumlah Bahan 81,600.00

Upah 0.3750 m3 Pekerja 36,000.00 13,500.00 0.0180 org Mandor 48,000.00 864.00

Jumlah Upah 14,364.00 Alat

0.1200 org Peralatan 15,100.00 1,812.00 Jumlah Alat 1,812.00

Jumlah Bahan + Upah + Alat 97,776.00

J.33 1 M2 PAS ONDERLAG BATU BELAH TEBAL 15 CMMaterial

0.0500 kg Pasir Urug (timbunan) 68,000.00 3,400.00 0.2000 m3 Batu Belah 125,000.00 25,000.00

Jumlah Bahan 28,400.00 Upah

0.3750 m3 Pekerja 36,000.00 13,500.00 0.0190 org Mandor 48,000.00 912.00

Jumlah Upah 14,412.00 Alat

0.0040 hr Sewa walls 150,000.00 600.00 0.1200 org Peralatan 15,100.00 1,812.00

Jumlah Alat 2,412.00

Jumlah Bahan + Upah + Alat 45,224.00

J.34 1 M2 PAS BATU LAPIS ATAS TEBAL 6 CMMaterial

0.0200 kg Pasir Urug / Sirtu 68,000.00 1,360.00 0.0800 m3 Batu Pecah 4/6 5/7 152,000.00 12,160.00

Jumlah Bahan 13,520.00 Upah

0.0750 m3 Pekerja 36,000.00 2,700.00 0.0038 org Mandor 48,000.00 182.40

Jumlah Upah 2,882.40 Alat

0.0040 hr Sewa walls 150,000.00 600.00 0.1200 org Peralatan 15,100.00 1,812.00

Jumlah Alat 2,412.00 4,824.00 Jumlah Bahan + Upah + Alat 18,814.40

J.35 1 BTG/4 M PENGADAAN DAN PEMASANGAN CERUCUKMaterial

1.0000 kg Kayu Dolken 39,000.00 39,000.00 Jumlah Bahan 39,000.00

Upah 0.0400 m3 Tukang Kayu 51,000.00 2,040.00 0.0040 m3 Kepala Tukang 54,000.00 216.00 0.2500 m3 Pekerja 36,000.00 9,000.00 0.0250 org Mandor 48,000.00 1,200.00

Jumlah Upah 12,456.00 Alat

0.1000 org Alat Bantu 15,100.00 1,510.00 Jumlah Alat 1,510.00

Jumlah Bahan + Upah + Alat 52,966.00

J.36 1 UNIT BOX PRECAST 100 x 100 x 120 x 15 , TERPASANGMaterial

1.0000 kg BC 100.50.120.15 (Bottom) 3,240,000.00 3,240,000.00 1.0000 kg BC 100.50.120.15 (Top) 3,240,000.00 3,240,000.00 0.5000 kg Excavator (+ operator) 252,000.00 126,000.00

Jumlah Bahan 6,606,000.00 Upah

1.0000 m3 Tukang 51,000.00 51,000.00 3.0000 m3 Pekerja 36,000.00 108,000.00 0.3000 org Mandor 48,000.00 14,400.00

Jumlah Upah 173,400.00 Alat

1.0000 org Alat Bantu 15,100.00 15,100.00 Jumlah Alat 15,100.00

Jumlah Bahan + Upah + Alat 6,794,500.00

J.37 1 UNIT BOX PRECAST 150 x 100 x 120 x 15 , TERPASANGMaterial

Page 78: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 78

1.0000 kg BC 150.50.120.15 (Bottom) 4,075,000.00 4,075,000.00 1.0000 kg BC 150.50.120.15 (Top) 4,075,000.00 4,075,000.00 0.5000 kg Excavator (+ operator) 252,000.00 126,000.00

Jumlah Bahan 8,276,000.00 Upah

1.0000 m3 Tukang 51,000.00 51,000.00 3.1000 m3 Pekerja 36,000.00 111,600.00 0.3000 org Mandor 48,000.00 14,400.00

Jumlah Upah 177,000.00 Alat

1.0000 org Alat Bantu 15,100.00 15,100.00 Jumlah Alat 15,100.00

Jumlah Bahan + Upah + Alat 8,468,100.00

J.38 1 UNIT BOX PRECAST 150 x 150 x 120 x 15 , TERPASANGMaterial

1.0000 kg BC 150.75.120.15 (Bottom) 4,860,000.00 4,860,000.00 1.0000 kg BC 150.75.120.15 (Top) 4,860,000.00 4,860,000.00 0.6000 kg Excavator (+ operator) 252,000.00 151,200.00

Jumlah Bahan 9,871,200.00 Upah

1.1000 m3 Tukang 51,000.00 56,100.00 3.2000 m3 Pekerja 36,000.00 115,200.00 0.4000 org Mandor 48,000.00 19,200.00

Jumlah Upah 190,500.00 Alat

1.0000 org Alat Bantu 15,100.00 15,100.00 Jumlah Alat 15,100.00

Jumlah Bahan + Upah + Alat 10,076,800.00

J.39 1 UNIT BOX PRECAST 200 x 150 x 120 x 20 , TERPASANGMaterial

1.0000 kg BC 200.75.120.20 (Bottom) 7,560,000.00 7,560,000.00 1.0000 kg BC 200.75.120.20 (Top) 7,560,000.00 7,560,000.00 1.0000 kg Excavator (+ operator) 252,000.00 252,000.00

Jumlah Bahan 15,372,000.00 Upah

1.2000 m3 Tukang 51,000.00 61,200.00 3.3000 m3 Pekerja 36,000.00 118,800.00 0.5000 org Mandor 48,000.00 24,000.00

Jumlah Upah 204,000.00 Alat

1.0000 org Alat Bantu 15,100.00 15,100.00 Jumlah Alat 15,100.00

Jumlah Bahan + Upah + Alat 15,591,100.00

J.40 1 UNIT BOX PRECAST 300 x 100 x 120 x 20 , TERPASANGMaterial

1.0000 kg BC 300.50.120.20 (Bottom) 8,640,000.00 8,640,000.00 1.0000 kg BC 300.50.120.20 (Top) 8,640,000.00 8,640,000.00 1.5000 kg Excavator (+ operator) 252,000.00 378,000.00

Jumlah Bahan 17,658,000.00 Upah

1.3000 m3 Tukang 51,000.00 66,300.00 3.4000 m3 Pekerja 36,000.00 122,400.00 0.6000 org Mandor 48,000.00 28,800.00

Jumlah Upah 217,500.00 Alat

1.0000 org Alat Bantu 15,100.00 15,100.00 Jumlah Alat 15,100.00

Jumlah Bahan + Upah + Alat 17,890,600.00

J.41 1 UNIT BOX PRECAST 380 x 350 x 120 x 20 , TERPASANGMaterial

1.0000 kg BC 380.175.120.20 (Bottom) 15,768,000.00 15,768,000.00 1.0000 kg BC 380.175.120.20 (Top) 15,768,000.00 15,768,000.00 2.5000 kg Excavator (+ operator) 252,000.00 630,000.00

Jumlah Bahan 32,166,000.00 Upah

1.4000 m3 Tukang 51,000.00 71,400.00 3.5000 m3 Pekerja 36,000.00 126,000.00 0.7000 org Mandor 48,000.00 33,600.00

Jumlah Upah 231,000.00 Alat

1.0000 org Alat Bantu 15,100.00 15,100.00 Jumlah Alat 15,100.00

Jumlah Bahan + Upah + Alat 32,412,100.00

J.42 1 UNIT BOX PRECAST 420 x 300 x 120 x 25 , TERPASANGMaterial

1.0000 kg BC 420.150.120.25 (Bottom) 19,440,000.00 19,440,000.00 1.0000 kg BC 420.150.120.25 (Top) 19,440,000.00 19,440,000.00 2.5000 kg Excavator (+ operator) 252,000.00 630,000.00

Jumlah Bahan 39,510,000.00

Page 79: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 79

Upah 1.5000 m3 Tukang 51,000.00 76,500.00 3.6000 m3 Pekerja 36,000.00 129,600.00 0.8000 org Mandor 48,000.00 38,400.00

Jumlah Upah 244,500.00 Alat

1.0000 org Alat Bantu 15,100.00 15,100.00 Jumlah Alat 15,100.00

Jumlah Bahan + Upah + Alat 39,769,600.00

J.43 1 UNIT RPC 500 x 2500, TERPASANGMaterial

1.0000 kg RPC 500 x 2500 117,500.00 117,500.00 0.4500 kg Excavator (+ operator) 252,000.00 113,400.00

Jumlah Bahan 230,900.00 Upah

1.0000 m3 Tukang 51,000.00 51,000.00 2.4250 m3 Pekerja 36,000.00 87,300.00 0.2500 org Mandor 48,000.00 12,000.00

Jumlah Upah 150,300.00 Alat

1.0000 org Alat Bantu 15,100.00 15,100.00 Jumlah Alat 15,100.00

Jumlah Bahan + Upah + Alat 396,300.00

J.44 1 UNIT RPC 800 x 2500, TERPASANGMaterial

1.0000 kg RPC 800 x 2500 117,500.00 117,500.00 0.4500 kg Excavator (+ operator) 252,000.00 113,400.00

Jumlah Bahan 230,900.00 Upah

1.0000 m3 Tukang 51,000.00 51,000.00 2.4250 m3 Pekerja 36,000.00 87,300.00 0.2500 org Mandor 48,000.00 12,000.00

Jumlah Upah 150,300.00 Alat

1.0000 org Alat Bantu 15,100.00 15,100.00 Jumlah Alat 15,100.00

Jumlah Bahan + Upah + Alat 396,300.00

XI K PEKERJAAN BESI & ALLUMUNIUMK.1 1 Kg Memasang Besi Profil

Material 1.1500 Kg Besi Profil 20,400.00 23,460.00 0.0600 Kg Meni Besi 24,700.00 1,482.00

Jumlah Bahan 24,942.00 Upah

0.0600 OH Pekerja 36,000.00 2,160.00 0.0600 OH Tukang Besi 51,000.00 3,060.00 0.0060 OH Kepala Tukang 54,000.00 324.00 0.0030 OH Mandor 48,000.00 144.00

Jumlah Upah 5,688.00

Jumlah Bahan + Upah + Alat 30,630.00

K.2 1 Kg Memasang Rangka Kuda-kuda Baja IWFMaterial

1.1500 kg Besi Baja IWF 21,300.00 24,495.00 Jumlah Bahan 24,495.00

Upah 0.0600 OH Pekerja 36,000.00 2,160.00 0.0600 OH Tukang Besi 51,000.00 3,060.00 0.0060 OH Kepala Tukang 54,000.00 324.00 0.0030 OH Mandor 48,000.00 144.00

Jumlah Upah 5,688.00

Jumlah Bahan + Upah + Alat 30,183.00

K.3 1 M' Memasang Talang Datar/Jurai , Seng BJLS 26 Lebar 90 cm Material

1.0500 Lbr Seng Plat BJLS 26 lebar 0.90 36,800.00 38,640.00 0.0150 Kg Paku Biasa 1/4" - 1 " 18,500.00 277.50 0.0190 m3 Kayu bengkirai (papan) 11,250,000.00 213,750.00

Jumlah Bahan 252,667.50 Upah

0.2000 OH Pekerja 36,000.00 7,200.00 0.4000 OH Tukang Kayu 51,000.00 20,400.00 0.0250 OH Kepala Tukang 54,000.00 1,350.00 0.0100 OH Mandor 48,000.00 480.00

Jumlah Upah 29,430.00

Jumlah Bahan + Upah + Alat 282,097.00

Page 80: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 80

K.4 1 M' Memasang Talang U 15 cm, Seng Plaat BJLS 26 lebar 45 cmLebar 45 cm

Material 1.0500 Lbr Seng Plat BJLS 26 lebar 0.60 25,800.00 27,090.00 0.0100 Kg Paku Biasa 1/4" - 1" 18,500.00 185.00 0.5000 Kg Besi strip 17,800.00 8,900.00

Jumlah Bahan 36,175.00 Upah

0.1500 OH Pekerja 36,000.00 5,400.00 0.3000 OH Tukang Kayu 51,000.00 15,300.00 0.0300 OH Kepala Tukang 54,000.00 1,620.00 0.0070 OH Mandor 48,000.00 336.00

Jumlah Upah 22,656.00

Jumlah Bahan + Upah + Alat 58,831.00

XII L PEKERJAAN KUNCI dan KACAL.1 1 BUAH Pasang Kunci Tanam Biasa

Material 1.0000 Buah Kunci Tanam Biasa 73,500.00 73,500.00

Jumlah Bahan 73,500.00 Upah

0.0100 OH Pekerja 36,000.00 360.00 0.5000 OH Tukang Kayu 51,000.00 25,500.00 0.0100 OH Kepala Tukang 54,000.00 540.00 0.0050 OH Mandor 48,000.00 240.00

Jumlah Upah 26,640.00

Jumlah Bahan + Upah + Alat 100,140.00

L.2 1 BUAH Pasang Kunci Tanam Kamar MandiMaterial

1.0000 Buah Kunci Tanam Kamar Mandi 73,500.00 73,500.00 Jumlah Bahan 73,500.00

Upah 0.0050 OH Pekerja 36,000.00 180.00 0.5000 OH Tukang Kayu 51,000.00 25,500.00 0.0050 OH Kepala Tukang 54,000.00 270.00 0.0025 OH Mandor 48,000.00 120.00

Jumlah Upah 26,070.00

Jumlah Bahan + Upah + Alat 99,570.00

L.3 1 BUAH Pasang Engsel PintuMaterial

1.0000 Buah Engsel Pintu 8,000.00 8,000.00 Jumlah Bahan 8,000.00

Upah 0.0150 OH Pekerja 36,000.00 540.00 0.1500 OH Tukang Kayu 51,000.00 7,650.00 0.0150 OH Kepala Tukang 54,000.00 810.00 0.0008 OH Mandor 48,000.00 38.40

Jumlah Upah 9,038.40

Jumlah Bahan + Upah + Alat 17,038.00

L.4 1 BUAH Pasang Engsel Jendela Kupu-kupuMaterial

1.0000 Buah Engsel Jendela 8,000.00 8,000.00 Jumlah Bahan 8,000.00

Upah 0.0100 OH Pekerja 36,000.00 360.00 0.1000 OH Tukang Kayu 51,000.00 5,100.00 0.0100 OH Kepala Tukang 54,000.00 540.00 0.0050 OH Mandor 48,000.00 240.00

Jumlah Upah 6,240.00

Jumlah Bahan + Upah + Alat 14,240.00

L.5 1 BUAH Pasang Engsel AnginMaterial

1.0000 Buah Engsel Angin 6,500.00 6,500.00 Jumlah Bahan 6,500.00

Upah 0.0200 OH Pekerja 36,000.00 720.00 0.2000 OH Tukang Kayu 51,000.00 10,200.00 0.0200 OH Kepala Tukang 54,000.00 1,080.00 0.0100 OH Mandor 48,000.00 480.00

Jumlah Upah 12,480.00

Jumlah Bahan + Upah + Alat 18,980.00

L.6 1 BUAH Pasang Kait AnginMaterial

1.0000 Buah Kait Angin 21,000.00 21,000.00 Jumlah Bahan 21,000.00

Upah 0.0150 OH Pekerja 36,000.00 540.00 0.1500 OH Tukang Kayu 51,000.00 7,650.00 0.0150 OH Kepala Tukang 54,000.00 810.00

Page 81: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 81

0.0008 OH Mandor 48,000.00 38.40 Jumlah Upah 9,038.40

Jumlah Bahan + Upah + Alat 30,038.00

L.7 1 BUAH Pasang Kunci SelotMaterial

1.0000 Buah Kunci Selot 55,000.00 55,000.00 Jumlah Bahan 55,000.00

Upah 0.0200 OH Pekerja 36,000.00 720.00 0.2000 OH Tukang Kayu 51,000.00 10,200.00 0.0200 OH Kepala Tukang 54,000.00 1,080.00 0.0010 OH Mandor 48,000.00 48.00

Jumlah Upah 12,048.00

Jumlah Bahan + Upah + Alat 67,048.00

L.8 1 BUAH Pasang Kunci LemariMaterial

1.0000 Buah Kunci Lemari 16,500.00 16,500.00 Jumlah Bahan 16,500.00

Upah 0.0250 OH Pekerja 36,000.00 900.00 0.2500 OH Tukang Kayu 51,000.00 12,750.00 0.0250 OH Kepala Tukang 54,000.00 1,350.00 0.0013 OH Mandor 48,000.00 62.40

Jumlah Upah 15,062.40

Jumlah Bahan + Upah + Alat 31,562.00

L.9 1 M2 Pasang Kaca tebal 5 mmMaterial

1.1000 m2 Kaca rayband tebal 5mm 117,000.00 128,700.00 Jumlah Bahan 128,700.00

Upah 0.0150 OH Pekerja 36,000.00 540.00 0.1500 OH Tukang Kayu 51,000.00 7,650.00 0.0150 OH Kepala Tukang 54,000.00 810.00 0.0008 OH Mandor 48,000.00 38.40

Jumlah Upah 9,038.40

Jumlah Bahan + Upah + Alat 137,738.00

Page 82: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 82

XIII M PEKERJAAN PENUTUP LANTAI dan DINDINGM.1 1 M2 Pasang lantai Ubin PC Abu-abu Uk. 20 x 20 cm

Material 1.0000 m2 Tegel polos 20x20 cm 26,000.00 26,000.00 10.4000 Kg Portland Semen 1,550.00 16,120.00 0.0135 m3 Pasir Pasang 230,000.00 3,105.00

Jumlah Bahan 45,225.00 Upah

0.2700 OH Pekerja 36,000.00 9,720.00 0.1300 OH Tukang Batu 51,000.00 6,630.00 0.0130 OH Kepala Tukang 54,000.00 702.00 0.0140 OH Mandor 48,000.00 672.00

Jumlah Upah 17,724.00

Jumlah Bahan + Upah + Alat 62,949.00

M.2 1 M2 Pasang lantai Ubin Granito Uk. 40 x 40 cmMaterial

1.1200 m2 Ubin Granito 40x40 cm polished (lokal) 509,000.00 570,080.00 9.8000 Kg Portland Semen 1,550.00 15,190.00 0.0450 m3 Pasir Pasang 230,000.00 10,350.00 1.3000 Kg Semen Warna 2,350.00 3,055.00

Jumlah Bahan 598,675.00 Upah

0.2500 OH Pekerja 36,000.00 9,000.00 0.1200 OH Tukang Batu 51,000.00 6,120.00 0.0120 OH Kepala Tukang 54,000.00 648.00 0.0130 OH Mandor 48,000.00 624.00

Jumlah Upah 16,392.00

Jumlah Bahan + Upah + Alat 615,067.00

M.3 1 M2 Pasang Lantai Keramik 30 x 30 cmMaterial

1.0800 m2 Ubin Keramik (kw I) 30 x 30 cm 50,000.00 54,000.00 10.0000 Kg Portland Semen 1,550.00 15,500.00 0.0450 m3 Pasir Pasang 230,000.00 10,350.00 1.5000 Kg Semen Warna 2,350.00 3,525.00

Jumlah Bahan 83,375.00 Upah

0.6200 OH Pekerja 36,000.00 22,320.00 0.3500 OH Tukang Batu 51,000.00 17,850.00 0.0350 OH Kepala Tukang 54,000.00 1,890.00 0.0300 OH Mandor 48,000.00 1,440.00

Jumlah Upah 43,500.00

Jumlah Bahan + Upah + Alat 126,875.00

M.4 1 M2 Pasang Lantai Keramik 20 x 20 cmMaterial

1.0000 m2 Ubin Keramik 20 x 20 cm 53,000.00 53,000.00 10.4000 Kg Portland Semen 1,550.00 16,120.00 0.0450 m3 Pasir Pasang 230,000.00 10,350.00 1.6200 Kg Semen Warna 2,350.00 3,807.00

Jumlah Bahan 83,277.00 Upah

0.6200 OH Pekerja 36,000.00 22,320.00 0.3500 OH Tukang Batu 51,000.00 17,850.00 0.0350 OH Kepala Tukang 54,000.00 1,890.00 0.0300 OH Mandor 48,000.00 1,440.00

Jumlah Upah 43,500.00

Jumlah Bahan + Upah + Alat 126,777.00

M.5 1M2 Memasang Lantai Marmer ukuran 1.00x1.00 mMaterial

1.0200 m2 Marmer Tulung agung 668,000.00 681,360.00 8.1900 Kg Portland Semen 1,550.00 12,694.50 0.0450 m3 Pasir Pasang 230,000.00 10,350.00 0.6500 Kg Semen Warna 2,350.00 1,527.50

Jumlah Bahan 705,932.00 Upah

0.6200 OH Pekerja 36,000.00 22,320.00 0.3500 OH Tukang Batu 51,000.00 17,850.00 0.0350 OH Kepala Tukang 54,000.00 1,890.00 0.0300 OH Mandor 48,000.00 1,440.00

Jumlah Upah 43,500.00

Jumlah Bahan + Upah + Alat 749,432.00

M.6 1 M2 Pasang Dinding Keramik 10x20 cm,Material

1.0000 m2 Keramik 10x20 cm 48,000.00 48,000.00 9.3000 Kg Portland Semen 1,550.00 14,415.00 0.0180 m3 Pasir Pasang 230,000.00 4,140.00 2.7500 Kg Semen Warna 2,350.00 6,462.50

Jumlah Bahan 73,017.50 Upah

0.6000 OH Pekerja 36,000.00 21,600.00 0.4500 OH Tukang Batu 51,000.00 22,950.00

Page 83: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 83

0.0450 OH Kepala Tukang 54,000.00 2,430.00 0.0300 OH Mandor 48,000.00 1,440.00

Jumlah Upah 48,420.00

Jumlah Bahan + Upah + Alat 121,437.00

M.7 1 M2 Pasang Dinding Keramik 20x20 cm,Material

1.0000 m2 Keramik 20x20 cm 53,000.00 53,000.00 9.3000 Kg Portland Semen 1,550.00 14,415.00 0.0180 m3 Pasir Pasang 230,000.00 4,140.00 2.7500 Kg Semen Warna 2,350.00 6,462.50

Jumlah Bahan 78,017.50 Upah

0.6000 OH Pekerja 36,000.00 21,600.00 0.4500 OH Tukang Batu 51,000.00 22,950.00 0.0450 OH Kepala Tukang 54,000.00 2,430.00 0.0300 OH Mandor 48,000.00 1,440.00

Jumlah Upah 48,420.00

Jumlah Bahan + Upah + Alat 126,437.00

Page 84: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 84

M.8 1M2 Memasang Dinding Marmer ukuran 1.00x1.00 mMaterial

1.0200 Buah Marmer 668,000.00 681,360.00 2.0000 Kg Paku 1" - 4" cm 17,500.00 35,000.00 12.4400 Kg Portland Semen 1,550.00 19,282.00 0.0250 m3 Pasir Pasang 230,000.00 5,750.00 0.6500 Kg Semen Warna 2,350.00 1,527.50

Jumlah Bahan 742,919.50 Upah

0.7200 OH Pekerja 36,000.00 25,920.00 0.6500 OH Tukang Batu 51,000.00 33,150.00 0.0650 OH Kepala Tukang 54,000.00 3,510.00 0.0350 OH Mandor 48,000.00 1,680.00

Jumlah Upah 64,260.00

Jumlah Bahan + Upah + Alat 807,179.00

M.9 1 M2 Pasang Dinding Batu Paros / Batu Tempel HitamMaterial

1.1000 m2 Batu Tempel 101,000.00 111,100.00 11.7500 Kg Portland Semen 1,550.00 18,212.50 0.0350 m3 Pasir Pasang 230,000.00 8,050.00

Jumlah Bahan 137,362.50 Upah

0.6200 OH Pekerja 36,000.00 22,320.00 0.3500 OH Tukang Batu 51,000.00 17,850.00 0.0350 OH Kepala Tukang 54,000.00 1,890.00 0.0300 OH Mandor 48,000.00 1,440.00

Jumlah Upah 43,500.00

Jumlah Bahan + Upah + Alat 180,862.00

M.10 1 M2 DINDING GRANIT IMPORTMaterial

1.0200 m2 Granit import 266,000.00 271,320.00 0.2600 zak P C (50 kg) 77,500.00 20,150.00 0.0300 m3 Pasir pasang 230,000.00 6,900.00 1.0000 lot Campuran kedap air 64,100.00 64,100.00

Jumlah Bahan 362,470.00 Upah

1.0000 org Pekerja 36,000.00 36,000.00 3.0000 org Tukang batu 51,000.00 153,000.00 0.2000 org Kepala tukang batu 54,000.00 10,800.00 0.1000 org Mandor 48,000.00 4,800.00

Jumlah Upah 204,600.00 Alat

0.4800 lot Alat bantu 15,100.00 7,248.00 Jumlah Alat 7,248.00

Jumlah Bahan + Upah + Alat 574,318.00

M.11 1 M2 LANTAI GRANIT IMPORTMaterial

1.0200 m2 Granit import 266,000.00 271,320.00 0.2600 zak P C (50 kg) 77,500.00 20,150.00 0.0300 m3 Pasir pasang 230,000.00 6,900.00 1.0000 lot Campuran kedap air 64,100.00 64,100.00

Jumlah Bahan 362,470.00 Upah

0.5000 org Pekerja 36,000.00 18,000.00 1.5000 org Tukang batu 51,000.00 76,500.00 0.1000 org Kepala tukang batu 54,000.00 5,400.00 0.0250 org Mandor 48,000.00 1,200.00

Jumlah Upah 101,100.00 Alat

0.0320 lot Alat bantu 15,100.00 483.20 Jumlah Alat 483.20

Jumlah Bahan + Upah + Alat 464,053.00

M.12 1 M2 LANTAI GRANITO UKURAN 60 X 60 POLISHEDMaterial

1.0800 m2 Granito 60 x 60 polished lokal 507,000.00 547,560.00 0.2600 zak P C (50 kg) 77,500.00 20,150.00 0.0300 m3 Pasir pasang 230,000.00 6,900.00 0.7500 lot Campuran kedap air 64,100.00 48,075.00

Jumlah Bahan 622,685.00 Upah

0.2500 org Pekerja 36,000.00 9,000.00 0.6000 org Tukang batu 51,000.00 30,600.00 0.0500 org Kepala tukang batu 54,000.00 2,700.00 0.0250 org Mandor 48,000.00 1,200.00

Jumlah Upah 43,500.00 Alat

0.0240 lot Alat bantu 15,100.00 362.40 Jumlah Alat 362.40

Jumlah Bahan + Upah + Alat 666,547.00

M.13 1 M2 DINDING GRANITO UKURAN 60 X 60 POLISHED

Page 85: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 85

Material 1.0800 m2 Granito 60 x 60 polished lokal 507,000.00 547,560.00 0.2600 zak P C (50 kg) 77,500.00 20,150.00 0.0300 m3 Pasir pasang 230,000.00 6,900.00 0.7500 lot Campuran kedap air 64,100.00 48,075.00

Jumlah Bahan 622,685.00 Upah

0.2500 org Pekerja 36,000.00 9,000.00 0.7000 org Tukang batu 51,000.00 35,700.00 0.0500 org Kepala tukang batu 54,000.00 2,700.00 0.0250 org Mandor 48,000.00 1,200.00

Jumlah Upah 48,600.00 Alat

0.0400 lot Alat bantu 15,100.00 604.00 Jumlah Alat 604.00

Jumlah Bahan + Upah + Alat 671,889.00

M.14 1 M2 LANTAI MARMER ITALYMaterial

1.0200 m2 marmer italy 1,519,000.00 1,549,380.00 0.2600 zak P C (50 kg) 77,500.00 20,150.00 0.0300 m3 Pasir pasang 230,000.00 6,900.00 1.0000 lot Campuran kedap air 64,100.00 64,100.00

Jumlah Bahan 1,640,530.00 Upah

0.5000 org Pekerja 36,000.00 18,000.00 1.5000 org Tukang batu 51,000.00 76,500.00 0.1000 org Kepala tukang batu 54,000.00 5,400.00 0.0250 org Mandor 48,000.00 1,200.00

Jumlah Upah 101,100.00 Alat

0.0320 lot Alat bantu 15,100.00 483.20 Jumlah Alat 483.20

Jumlah Bahan + Upah + Alat 1,742,113.00

Page 86: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 86

M.15 1 M2 DINDING MARMER ITALYMaterial

1.0200 m2 marmer italy 1,519,000.00 1,549,380.00 0.2600 zak P C (50 kg) 77,500.00 20,150.00 0.0300 m3 Pasir pasang 230,000.00 6,900.00 1.0000 lot Campuran kedap air 64,100.00 64,100.00

Jumlah Bahan 1,640,530.00 Upah

1.0000 org Pekerja 36,000.00 36,000.00 3.0000 org Tukang batu 51,000.00 153,000.00 0.2000 org Kepala tukang batu 54,000.00 10,800.00 0.0250 org Mandor 48,000.00 1,200.00

Jumlah Upah 201,000.00 Alat

0.4800 lot Alat bantu 15,100.00 7,248.00 Jumlah Alat 7,248.00

Jumlah Bahan + Upah + Alat 1,848,778.00

XIV N PEKERJAAN PENGECATAN

N.1 1 M2 Mendempul dan Menggosok KayuMaterial

0.0800 Kg Dempul Jadi 22,400.00 1,792.00 0.0200 Kg Minyak Cat 17,700.00 354.00 0.1000 lbr Amplas 3,900.00 390.00

Jumlah Bahan 2,536.00 Upah

0.0400 OH Pekerja 36,000.00 1,440.00 0.0400 OH Tukang Cat 51,000.00 2,040.00 0.0040 OH Kepala Tukang 54,000.00 216.00 0.0025 OH Mandor 48,000.00 120.00

Jumlah Upah 3,816.00

Jumlah Bahan + Upah + Alat 6,352.00

N.2 1 M2 Pengecatan Bidang LamaMaterial

0.1500 Kg Plamir 23,300.00 3,495.00 0.1700 Kg Cat Dasar 48,800.00 8,296.00 0.1700 Kg Cat Penutup 61,700.00 10,489.00

Jumlah Bahan 22,280.00 Upah

0.0700 OH Pekerja 36,000.00 2,520.00 0.0750 OH Tukang Cat 51,000.00 3,825.00 0.0075 OH Kepala Tukang 54,000.00 405.00 0.0025 OH Mandor 48,000.00 120.00

Jumlah Upah 6,870.00

Jumlah Bahan + Upah + Alat 29,150.00

N.3 1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)1 lap.Cat Dasar & 2 lap.Cat Penutup

Material 0.2000 Kg Cat Meni 24,700.00 4,940.00 0.1500 Kg Plamir 23,300.00 3,495.00 0.1700 Kg Cat Dasar 48,800.00 8,296.00 0.2600 Kg Cat Penutup 2 kali 61,700.00 16,042.00

Jumlah Bahan 32,773.00 Upah

0.0700 OH Pekerja 36,000.00 2,520.00 0.0090 OH Tukang Cat 51,000.00 459.00 0.0060 OH Kepala Tukang 54,000.00 324.00 0.0025 OH Mandor 48,000.00 120.00

Jumlah Upah 3,423.00

Jumlah Bahan + Upah + Alat 36,196.00

N.4 1 M2 Pengecatan Bidang Kayu Baru (1 lap.Plamir)1 lap.Cat Dasar & 3 lap.Cat Penutup

Material 0.2000 Kg Cat Meni 24,700.00 4,940.00 0.1500 Kg Plamir 23,300.00 3,495.00 0.1700 Kg Cat Dasar 48,800.00 8,296.00 0.3500 Kg Cat Penutup 2 kali 61,700.00 21,595.00

Jumlah Bahan 38,326.00 Upah

0.0700 OH Pekerja 36,000.00 2,520.00 0.1050 OH Tukang Cat 51,000.00 5,355.00 0.0040 OH Kepala Tukang 54,000.00 216.00 0.0025 OH Mandor 48,000.00 120.00

Jumlah Upah 8,211.00

Jumlah Bahan + Upah + Alat 46,537.00

N.5 1 M2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar

2 lap. Cat Penutup)

Material

0.1000 Kg Plamir 21,200.00 2,120.00

Page 87: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 87

0.1000 Kg Cat Dasar 22,000.00 2,200.00

0.2600 Kg Cat Penutup 2 kali 28,300.00 7,358.00

Jumlah Bahan 11,678.00

Upah

0.0200 OH Pekerja 36,000.00 720.00

0.0630 OH Tukang Cat 51,000.00 3,213.00

0.0063 OH Kepala Tukang 54,000.00 340.20

0.0025 OH Mandor 48,000.00 120.00

Jumlah Upah 4,393.20

Jumlah Bahan + Upah + Alat 16,071.00

N.6 1 M2 Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup)

Material

0.1000 Kg Cat Dasar 22,000.00 2,200.00

0.1800 Kg Cat Penutup 2 kali 28,300.00 5,094.00

Jumlah Bahan 7,294.00

Upah

0.0280 OH Pekerja 36,000.00 1,008.00

0.0420 OH Tukang Cat 51,000.00 2,142.00

0.0042 OH Kepala Tukang 54,000.00 226.80

0.0025 OH Mandor 48,000.00 120.00

Jumlah Upah 3,496.80

Jumlah Bahan + Upah + Alat 10,790.00

Page 88: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 88

N.7 1 M2 Pengecatan Permukaan Baja dg Meni Besi

Material

0.1000 Kg Meni Besi 24,700.00 2,470.00

0.0100 Kg Lem kuning (aica aibon) 58,400.00 584.00

Jumlah Bahan 3,054.00

Upah

0.0200 OH Pekerja 36,000.00 720.00

0.2000 OH Tukang Cat 51,000.00 10,200.00

0.0020 OH Kepala Tukang 54,000.00 108.00

0.0100 OH Mandor 48,000.00 480.00

Jumlah Upah 11,508.00

Jumlah Bahan + Upah + Alat 14,562.00

N.8 1 M2 Pengecatan Permukaan Baja dg Meni Besi & Perancah

Material

0.1000 Kg Meni Besi 24,700.00 2,470.00

0.0100 Kg Perekat / Lem 58,400.00 584.00

0.0020 m3 Perancah Kayu 2,269,000.00 4,538.00

Jumlah Bahan 7,592.00

Upah

0.2500 OH Pekerja 36,000.00 9,000.00

0.2250 OH Tukang Cat 51,000.00 11,475.00

0.0225 OH Kepala Tukang 54,000.00 1,215.00

0.0075 OH Mandor 48,000.00 360.00

Jumlah Upah 22,050.00

Jumlah Bahan + Upah + Alat 29,642.00

N.9 1 M2 Pengecatan Permukaan Baja lapis Seng (Galvanis) secara

Manual sistem 3 lap. Cat Konvensional dg Tebal 200 μm

Bahan

0.1100 Kg Cat dasar 55,300.00 6,083.00

0.1700 Kg Cat Antara 55,300.00 9,401.00

0.0800 Kg Cat Penutup 59,400.00 4,752.00

Jumlah Bahan 20,236.00

Upah

0.5000 OH Pekerja 36,000.00 18,000.00

0.8000 OH Tukang Cat 51,000.00 40,800.00

0.3000 OH Kepala Tukang 54,000.00 16,200.00

0.2000 OH Mandor 48,000.00 9,600.00

Jumlah Upah 84,600.00

Jumlah Bahan + Upah + Alat 104,836.00

N.10 1 M2 PLITURAN BANGUNAN ( BIASA )

Bahan

0.0300 kg Dempul plitur (dempul kasar) 22,400.00 672.00

0.2000 kg Wood Filler (INFRA) 38,000.00 7,600.00

0.0200 kg Oker putih 27,400.00 548.00

0.0100 kg Oker warna 27,700.00 277.00

0.2000 kg Batu apung (gosok) 20,200.00 4,040.00

0.0100 kg Sirlak 85,600.00 856.00

0.1000 bh kwas 3" 8,400.00 840.00

0.2000 ltr Spritus 13,100.00 2,620.00

0.1000 lbr Ampelas kayu 3,900.00 390.00

Jumlah Bahan 17,843.00

Upah

0.2500 org Pekerja 36,000.00 9,000.00

0.2850 org Tukang cat 51,000.00 14,535.00

0.0400 org Kepala tukang cat 54,000.00 2,160.00

0.0200 org Mandor 48,000.00 960.00

Jumlah Upah 26,655.00

Jumlah Bahan + Upah + Alat 44,498.00

N.11 1 M2 PLITURAN MEUBELAIR

Bahan

0.0300 kg Dempul plitur (dempul kasar) 22,400.00 672.00

0.2000 kg Wood Filler (INFRA) 38,000.00 7,600.00

0.3500 kg Melamik 84,000.00 29,400.00

0.0200 kg Oker putih 27,400.00 548.00

0.0100 kg Oker warna 27,700.00 277.00

0.1000 kg Batu apung (gosok) 20,200.00 2,020.00

0.2000 kg Sirlak 85,600.00 17,120.00

Page 89: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 89

0.0100 bh kwas 3" 8,400.00 84.00

0.2000 ltr Spritus 13,100.00 2,620.00

0.1000 lbr Ampelas kayu 3,900.00 390.00

Jumlah Bahan 60,731.00

Upah

0.2500 org Pekerja 36,000.00 9,000.00

0.2850 org Tukang cat 51,000.00 14,535.00

0.0400 org Kepala tukang cat 54,000.00 2,160.00

0.0200 org Mandor 48,000.00 960.00

Jumlah Upah 26,655.00

Jumlah Bahan + Upah + Alat 87,386.00

Rembang, Januari 2013

KEPALA DINAS PEKERJAAN UMUMKABUPATEN REMBANG

Page 90: Analisa Rab 2013

file:///tt/file_convert/55cf9cdc550346d033ab5309/document.xls 90

Ir. MUJOKO, MT.NIP. 010 234 645 / 19620715 199011 1 002

Page 91: Analisa Rab 2013

DAFTAR ANALISE

STANDAR NASIONAL INDONESIA

DINAS PEKERJAAN UMUM KABUPATEN REMBANG

TAHUN 2013