PERINCIANANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIKBESERTA BAHAN SAKLAR NATIONAL KREM
DI RUMAH PAK D. JUHARI DI PERUM LESTARI
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI LAMPU TL 69 TITIK RP. 95,000
2 INSTALASI LAMPU HALOGEN 16 TITIK RP. 95,000
3 INSTALASI LAMPU DOLET 95 TITIK RP. 95,000
4 INSTALASI LAMPU GANTUNG 2 TITIK RP. 150,000
5 INSTALASI LAMPU KACA WASTAFEL 4 TITIK RP. 95,000
6 INSTALASI LAMPU DINDING 7 TITIK RP. 150,000
7 INSTALASI LAMPU KITC. SET 7 TITIK RP. 95,000
8 INSTALASI LAMPU PEN 6 TITIK RP. 150,000
9 STOP KONTAK LILSTRIK 45 TITIK RP. 95,000
10 STOP KONTAK TV UHF 8 TITIK RP. 225,000
11 STOP KONTAK TELEPON 6 TITIK RP. 225,000
12 KABEL PARABOLA UHF 6 TITIK RP. 225,000
13 KABEL STOP KONTAK AC 6 TITIK RP. 375,000
14 KABEL WARHITR 2 TITIK RP. 375,000
15 KABEL INDUK 4x6 85 METER RP. 45,000
16 PASANG WARHITR 2 SET RP. 250,000
17 BOX SENTRAL TELEPON 1 SET RP. 350,000
18 BOX PANEL LISTRIK 2 SET RP. 1,500,000
19 OHM SAKLAR LISTRIK 1 SET RP. 1,500,000
20 ARDE INSTALASI 1 SET RP. 1,500,000
21 MASA BUMI HPR 1 SET RP. 1,500,000
JUMLAH TOTAL
JUMLAH PINJAMAN
JUMLAH SISA
JAMBI, 8 SEPTEMBER 2005HORMAT KAMI,
SUGIYONO
PERINCIANANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIKBESERTA BAHAN SAKLAR NATIONAL KREM
DI RUMAH PAK D. JUHARI DI PERUM LESTARI
TOTAL
RP. 6,555,000
RP. 1,520,000
RP. 9,025,000
RP. 300,000
RP. 380,000
RP. 1,050,000
RP. 665,000
RP. 900,000
RP. 4,275,000
RP. 1,800,000
RP. 1,350,000
RP. 1,350,000
RP. 2,250,000
RP. 750,000
RP. 3,825,000
RP. 500,000
RP. 350,000
RP. 3,000,000
RP. 1,500,000
RP. 1,500,000
RP. 1,500,000
RP. ###
RP. ###
RP. ###
PERINCIANANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIKBESERTA BAHAN SAKLAR GLIFSAL PUTIH
DI KANTOR PAK DJUNAID DI KANTOR JELUTUNG
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 PASANG SAKLAR 18 TITIK RP. 65,000
2 PASANG STOP KONTAK 15 TITIK RP. 65,000
3 INSTALASI TAMBAH KABEL PLAFON 24 TITIK RP. 30,000
4 INSTALASI LAMPU 4 TITIK RP. 95,000
5 INSTALASI STOP KONTAK 2 TITIK RP. 95,000
6 INSTALASI KABEL AC 5 TITIK RP. 375,000
7 INSTALASI PIPA AIR AC 5 TITIK RP. 200,000
8 INSTALASI KABEL INDUK 4X6 50 METER RP. 50,000
9 INSTALASI PANEL BOX INDUK 30X40 3 SET RP. 1,500,000
JUMLAH TOTAL
JAMBI, 27 SEPTEMBER 2005HORMAT KAMI, DISETUJUI OLEH
SUGIYONO PAK DJUNAID
PERINCIANANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIKBESERTA BAHAN SAKLAR GLIFSAL PUTIH
DI KANTOR PAK DJUNAID DI KANTOR JELUTUNG
TOTAL
RP. 1,170,000
RP. 975,000
RP. 720,000
RP. 380,000
RP. 190,000
RP. 1,875,000
RP. 1,000,000
RP. 2,500,000
RP. 4,500,000
RP. 13,310,000
DISETUJUI OLEH
PAK DJUNAID
PERINCIANANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIKBESERTA BAHAN SAKLAR NATIONAL KREM
DI RUMAH PAK AYONG DI MURNI
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI LAMPU 44 TITIK RP. 95,000
2 INSTALASI STOP KONTAK 19 TITIK RP. 95,000
3 INSTALASI KABEL AC 3 TITIK RP. 350,000
4 INSTALASI KABEL PARABOLA 3 TITIK RP. 225,000
5 INSTALASI KABEL GENSET 3X6 28 METER RP. 40,000
6 INSTALASI KABEL INDUK 3X6 25 TITIK RP. 40,000
7 INSTALASI SAKLAR GENSET 1 SET RP. 1,000,000
8 PASANG BOX PANEL INDUK 1 SET RP. 1,000,000
9 PASANG BOX MCB 1 SET RP. 750,000
10 INSTALASI GROUND 1 SET RP. 750,000
11 INSTALASI KABEL TELEPON 2 TITIK RP. 225,000
JUMLAH TOTAL
JAMBI, 11 OKTOBER 2005HORMAT KAMI, DISETUJUI OLEH
SUGIYONO PAK AYONG
PERINCIANANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIKBESERTA BAHAN SAKLAR NATIONAL KREM
DI RUMAH PAK AYONG DI MURNI
TOTAL
RP. 4,180,000
RP. 1,805,000
RP. 1,050,000
RP. 675,000
RP. 1,120,000
RP. 1,000,000
RP. 1,000,000
RP. 1,000,000
RP. 750,000
RP. 750,000
RP. 450,000
RP. 13,780,000
DISETUJUI OLEH
PAK AYONG
PERINCIANANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIKBESERTA BAHAN SAKLAR GLIFSAL PUTIH
DI KANTOR PAK DJUNAID DI KANTOR JELUTUNG
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 PASANG SAKLAR 18 TITIK RP.
2 PASANG STOP KONTAK 15 TITIK RP.
3 INSTALASI TAMBAH KABEL PLAFON 24 TITIK RP.
4 INSTALASI LAMPU TAMBAH BARU 39 TITIK RP.
5 INSTALASI STOP KONTAK TAMBAH BARU 13 TITIK RP.
6 INSTALASI KABEL AC 4 TITIK RP.
7 INSTALASI PIPA AIR AC 4 TITIK RP.
8 INSTALASI PIPA SELANG AC 2 TITIK RP.
9 INSTALASI KABEL INDUK 4X6 50 METER RP.
10 INSTALASI PANEL BOX INDUK 30X40 3 SET RP.
11 INSTALASI PANEL ARDE 12 M 1 SET RP.
12 INSTALASI HPR MASSA BUMI 25 M 1 SET RP.
13 INSTALASI KABEL INDUK TELEPON 3 TITIK RP.
14 INSTALASI BOX INDUK TELEPON 1 SET RP.
15 INSTALASI KABEL TELEPON 6 TITIK RP.
16 INSTALASI KABEL AIPON 4 TITIK RP.
17 INSTALASI KABEL PARABOLA UHF 2 TITIK RP.
18 INSTALASI KABEL TV PARABOLA 2 TITIK RP.
19 INSTALASI KABEL TV UHF 2 TITIK RP.
20 INSTALASI OM SAKLAR GENSET 1 SET RP.
21 INSTALASI KABEL GENSET 25 METER RP.
JUMLAH TOTAL
JAMBI, 25 NOVEMBER 2005HORMAT KAMI, DISETUJUI OLEH
SUGIYONO PAK DJUNAID
PERINCIANANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIKBESERTA BAHAN SAKLAR GLIFSAL PUTIH
DI KANTOR PAK DJUNAID DI KANTOR JELUTUNG
HARGA TOTAL
65,000 RP. 1,170,000
65,000 RP. 975,000
30,000 RP. 720,000
95,000 RP. 3,705,000
95,000 RP. 1,235,000
375,000 RP. 1,500,000
200,000 RP. 800,000
200,000 RP. 400,000
50,000 RP. 2,500,000
1,500,000 RP. 4,500,000
1,500,000 RP. 1,500,000
2,000,000 RP. 2,000,000
225,000 RP. 675,000
225,000 RP. 225,000
225,000 RP. 1,350,000
225,000 RP. 900,000
250,000 RP. 500,000
250,000 RP. 500,000
250,000 RP. 500,000
1,500,000 RP. 1,500,000
50,000 RP. 1,250,000
JUMLAH TOTAL RP. 28,405,000
DISETUJUI OLEH
PAK DJUNAID
PERINCIANANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIKBESERTA BAHAN SAKLAR GLIFSAL PUTIH
DI KANTOR PAK DJUNAID DI KANTOR JELUTUNG
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI LAMPU TAMBAH BARU 34 TITIK RP.
2 INSTALASI STOP KONTAK TAMBAH BARU 11 TITIK RP.
3 INSTALASI PIPA SELANG AC 2 TITIK RP.
4 INSTALASI PANEL ARDE 12 M 1 SET RP.
5 INSTALASI HPR MASSA BUMI 25 M 1 SET RP.
6 INSTALASI KABEL INDUK TELEPON 3 TITIK RP.
7 INSTALASI BOX INDUK TELEPON 1 SET RP.
8 INSTALASI KABEL TELEPON 6 TITIK RP.
9 INSTALASI KABEL AIPON 4 TITIK RP.
10 INSTALASI KABEL PARABOLA UHF 2 TITIK RP.
11 INSTALASI KABEL TV PARABOLA 2 TITIK RP.
12 INSTALASI KABEL TV UHF 2 TITIK RP.
13 INSTALASI OM SAKLAR GENSET 1 SET RP.
14 INSTALASI KABEL GENSET 25 METER RP.
JUMLAH TOTAL
JAMBI, 26 NOVEMBER 2005HORMAT KAMI, DISETUJUI OLEH
SUGIYONO PAK DJUNAID
PERINCIANANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIKBESERTA BAHAN SAKLAR GLIFSAL PUTIH
DI KANTOR PAK DJUNAID DI KANTOR JELUTUNG
HARGA TOTAL
95,000 RP. 3,230,000
95,000 RP. 1,045,000
200,000 RP. 400,000
1,500,000 RP. 1,500,000
2,000,000 RP. 2,000,000
225,000 RP. 675,000
225,000 RP. 225,000
225,000 RP. 1,350,000
225,000 RP. 900,000
250,000 RP. 500,000
250,000 RP. 500,000
250,000 RP. 500,000
1,500,000 RP. 1,500,000
50,000 RP. 1,250,000
JUMLAH TOTAL RP. 15,575,000
DISETUJUI OLEH
PAK DJUNAID
PERINCIANANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIKBESERTA BAHAN SAKLAR GLIFSAL PUTIH
DI KANTOR PAK DJUNAID DI KANTOR JELUTUNG
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 PASANG SAKLAR 18 TITIK RP. 65,000
2 PASANG STOP KONTAK 15 TITIK RP. 65,000
3 INSTALASI TAMBAH KABEL PLAFON 24 TITIK RP. 30,000
4 INSTALASI LAMPU 4 TITIK RP. 95,000
5 INSTALASI STOP KONTAK 2 TITIK RP. 95,000
6 INSTALASI KABEL AC 4 TITIK RP. 375,000
7 INSTALASI PIPA AIR AC 4 TITIK RP. 200,000
8 INSTALASI KABEL INDUK 4X6 50 METER RP. 50,000
9 INSTALASI PANEL BOX INDUK 30X40 3 SET RP. 1,500,000
JUMLAH A
1 INSTALASI LAMPU TAMBAH BARU 34 TITIK RP. 95,000
2 INSTALASI STOP KONTAK TAMBAH BARU 12 TITIK RP. 95,000
3 INSTALASI PIPA AIR AC 2 TITIK RP. 200,000
4 INSTALASI KABEL AC 2 TITIK RP. 375,000
5 INSTALASI PIPA SELANG AC 2 TITIK RP. 200,000
6 INSTALASI PANEL ARDE 12 M 1 SET RP. 1,250,000
7 INSTALASI HPR MASSA BUMI 25 M 1 SET RP. 1,500,000
8 INSTALASI KABEL INDUK TELEPON 3 TITIK RP. 175,000
9 INSTALASI BOX INDUK TELEPON 1 SET RP. 175,000
10 INSTALASI KABEL TELEPON 6 TITIK RP. 175,000
11 INSTALASI KABEL AIPON 4 TITIK RP. 175,000
12 INSTALASI KABEL PARABOLA UHF 2 TITIK RP. 175,000
13 INSTALASI KABEL TV PARABOLA 2 TITIK RP. 175,000
14 INSTALASI KABEL TV UHF 2 TITIK RP. 175,000
15 INSTALASI OM SAKLAR GENSET 1 SET RP. 1,250,000
16 INSTALASI KABEL GENSET 20 METER RP. 50,000
JUMLAH BTOTAL A + BPINJAMAN
SISA
JAMBI, 3 JANUARI 2006HORMAT KAMI, DISETUJUI OLEH
SUGIYONO PAK DJUNAID
PERINCIANANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIKBESERTA BAHAN SAKLAR GLIFSAL PUTIH
DI KANTOR PAK DJUNAID DI KANTOR JELUTUNG
TOTAL
RP. 1,170,000
RP. 975,000
RP. 720,000
RP. 380,000
RP. 190,000
RP. 1,500,000
RP. 800,000
RP. 2,500,000
RP. 4,500,000
RP. 12,735,000
RP. 3,230,000
RP. 1,140,000
RP. 400,000
RP. 750,000
RP. 400,000
RP. 1,250,000
RP. 1,500,000
RP. 525,000
RP. 175,000
RP. 1,050,000
RP. 700,000
RP. 350,000
RP. 350,000
RP. 350,000
RP. 1,250,000
RP. 1,000,000
RP. 14,420,000
RP. 27,155,000 RP. 14,000,000
RP. 13,155,000
DISETUJUI OLEH
PAK DJUNAID
PERINCIAN ANGGARAN BIAYAPEMASANGAN INSTALASI LISTRIK
BESERTA BAHAN SAKLAR VYBA PUTIHDENGAN KABEL STANDAR PARABA 2,5/1,5 BIASA
PITING PLAFON STANDAR VYBA SEGIEMPATDI PERUMAHAN PT. NUSA UNGGUL ABADI
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI LAMPU @ TITIK RP. 50,000
2 INSTALASI STOP KONTAK @ TITIK RP. 50,000
3 INSTALASI BOX MCB @ TITIK RP. 50,000
4 INSTALASI GROUND KWH @ TITIK RP. 50,000
JAMBI, 4 JANUARI 2006HORMAT KAMI,
SUGIYONO
DEMIKIANLAH PERINCIAN PEKERJAAN PEMASANGAN (INSTALASI)LISTRIK. KAMI MOHON UNTUK DIPERTIMBANGKAN OLEHBAPAK PIMPINAN PT. NUSA UNGGUL ABADI.
SEBELUM DAN SESUDAHNYA KAMI UCAPKAN TERIMA KASIH
PERINCIANANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIK
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 PASANG LAMPU 37 TITIK RP.
2 PASANG STOP KONTAK 20 TITIK RP.
3 INSTALASI STOP KONTAK TV 2 TITIK RP.
4 INSTALASI STOP KONTAK TELEPON 2 TITIK RP.
5 INSTALASI BOX MCB 1 TITIK RP.
6 INSTALASI LAMPU TAMAN 2 TITIK RP.
7 INSTALASI PINDAH KWH 1 TITIK RP.
8 INSTALASI PASANG ARDE 1 METER RP.
9 INSTALASI PASANG KABEL IB 12 SET RP.
10 PEKERJAAN BOR LAMPU DONLET 20 METER RP.
JUMLAH
PINJAMAN
SISA
JAMBI, 1 MARET 2006HORMAT KAMI, DISETUJUI OLEH
SUGIYONO
JAS KERJA DI RUMAH BARU IBU XXXXXXX
PERINCIANANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIK
HARGA TOTAL
25,000 RP. 925,000
25,000 RP. 500,000
75,000 RP. 150,000
25,000 RP. 50,000
150,000 RP. 150,000
75,000 RP. 150,000
150,000 RP. 150,000
150,000 RP. 150,000
10,000 120,000
10,000 200,000
JUMLAH RP. 2,545,000
PINJAMAN RP. 1,000,000
SISA RP. 1,545,000
DISETUJUI OLEH
JAS KERJA DI RUMAH BARU IBU XXXXXXX
PERINCIANANGGARAN BIAYA
PERBAIKAN DAN PENGGANTIAN TRAFO DAN LAMPUDI KANTOR PELAYANAN PAJAK
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 GANTI LAMPU TL 40 WATT 36 BUAH RP.
2 GANTI TRAFO 40 WATT 25 BUAH RP.
3 GANTI STARTER 40 WATT 40 BUAH RP.
4 GANTI MCB 16A 1 BUAH RP.
5 GANTI SAKLAR SERI 1 BUAH RP.
6 JASA PERBAIKAN LANTAI I 40 TITIK RP.
JUMLAH UNTUK RUANGAN LANTAI I
7 GANTI LAMPU TL 20 WATT 25 BUAH RP.
8 GANTI TRAFO 20 WATT 15 BUAH RP.
9 GANTI STARTER 20 WATT 30 BUAH RP.
10 GANTI MCB AC 10A 1 BUAH RP.
11 GANTI SAKLAR ENGKEL 1 BUAH RP.
12 GANTI LAMPU TL 2 X 40 WATT 1 SET RP.
13 JASA PERBAIKAN LANTAI II 30 TITIK RP.
JUMLAH UNTUK RUANGAN LANTAI II
TOTAL PEKERJAAN LANTAI I DAN II
JAMBI, 27 MARET 2006HORMAT KAMI, DISETUJUI OLEH
SUGIYONO SIHOMBING
PERINCIANANGGARAN BIAYA
PERBAIKAN DAN PENGGANTIAN TRAFO DAN LAMPUDI KANTOR PELAYANAN PAJAK
HARGA TOTAL
15,000 RP. 540,000
25,000 RP. 625,000
3,500 RP. 140,000
60,000 RP. 60,000
20,000 RP. 20,000
20,000 RP. 800,000
JUMLAH UNTUK RUANGAN LANTAI I RP. 2,185,000
12,500 RP. 312,500
25,000 RP. 375,000
3,500 RP. 105,000
60,000 RP. 60,000
20,000 RP. 20,000
185,000 RP. 185,000
20,000 RP. 600,000
JUMLAH UNTUK RUANGAN LANTAI II RP. 1,657,500
TOTAL PEKERJAAN LANTAI I DAN II RP. 3,842,500
DISETUJUI OLEH
SIHOMBING
PERINCIANANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIKDI KANTOR JELUTUNG
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI DONLET 24 TITIK RP.
2 INSTALASI LAMPU TL RM 9 TITIK RP.
3 INSTALASI LAMPU HALOGEN 2 TITIK RP.
4 INSTALASI LAMPU MERK 2 TITIK RP.
5 INSTALASI STOP KONTAK 14 TITIK RP.
6 INSTALASI KIPAS ANGIN 1 TITIK RP.
7 INSTALASI KABEL AC 3 TITIK RP.
8 INSTALASI PIPA SELONGSONG AC 2 TITIK RP.
9 INSTALASI PIPA AIR AC 3 TITIK RP.
10 INSTALASI KABEL INDUK 62 METER RP.
11 INSTALASI BOX PANEL MCB 1 SET RP.
12 INSTALASI TASOPEN 1 TITIK RP.
13 INSTALASI ARDEK/HPR 1 SET RP.
TOTAL BIAYA INSTALASI
JAMBI, 17 APRIL 2006HORMAT KAMI,
SUGIYONO
PERINCIANANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIKDI KANTOR JELUTUNG
HARGA TOTAL
35,000 RP. 840,000
35,000 RP. 315,000
35,000 RP. 70,000
100,000 RP. 200,000
35,000 RP. 490,000
125,000 RP. 125,000
125,000 RP. 375,000
50,000 RP. 100,000
50,000 RP. 150,000
10,000 RP. 620,000
250,000 RP. 250,000
50,000 RP. 50,000
2,250,000 RP. 2,250,000
TOTAL BIAYA INSTALASI RP. 5,835,000
PERINCIANANGGARAN BIAYA
PEMASANGAN DAN INSTALASI LISTRIKDI KANTOR PAK AKAK
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA 1 INSTALASI LAMPPUU TLRM 3 TITIK RP. 2 INSTALASI LAMPPU DONLET 4 TITIK RP. 3 INSTALASI STOP KONTAK 4 TITIK RP. 4 INSTALASI BOX PANEL MCB 2 TITIK RP. 5 INSTALASI KABEL AC 1 TITIK RP. 6 INSTALASI KABEL INDUK 10 METER RP.
TOTAL BIAYA INSTALASI
JAMBI, 2 MEI 2006HORMAT KAMI,
SUGIYONO
PERINCIANANGGARAN BIAYA
PERBAIKAN DAN PENGGANTIAN MCBDI RUMAH PAK CIPTO, JL. LINGKAR SELATAN, JAMBI
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA 1 INSTALASI MCB CLIPSAL 14 BUAH RP. 2 INSTALASI SELEP MCB 2 BUAH RP. 3 JASA KERJA 2 SET RP.
TOTAL BIAYA INSTALASI
JAMBI, 2 MEI 2006HORMAT KAMI,
SUGIYONO
PERINCIANANGGARAN BIAYA
PEMASANGAN DAN INSTALASI LISTRIKDI KANTOR PAK AKAK
HARGA TOTAL 35,000 RP. 105,000 35,000 RP. 140,000 35,000 RP. 140,000 250,000 RP. 500,000 125,000 125,000 10,000 RP. 100,000
TOTAL BIAYA INSTALASI RP. 1,110,000
PERINCIANANGGARAN BIAYA
PERBAIKAN DAN PENGGANTIAN MCBDI RUMAH PAK CIPTO, JL. LINGKAR SELATAN, JAMBI
HARGA TOTAL 50,000 RP. 700,000 25,000 RP. 50,000 150,000 RP. 300,000
TOTAL BIAYA INSTALASI RP. 1,050,000
PERINCIANANGGARAN BIAYA
PERBAIKAN DAN PENGGANTIAN TRAFO DAN LAMPUDI HALAMAN KANTOR PELAYANAN PAJAK
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 GANTI LAMPU TL 40 WATT 14 BUAH RP.
2 GANTI TRAFO 40 WATT 14 BUAH RP.
3 GANTI STARTER 40 WATT 14 BUAH RP.
4 GANTI BOX MCB OB 1 BUAH RP.
5 GANTI MCB 6 AMPHERE 1 BUAH RP.
6 PASANG LAMPU TAMAN 3 SET RP.
7 PASANG LAMPU PIJAR 40 WATT 14 BUAH RP.
8 PASANG LAMPU TL 20 WATT 14 BUAH RP.
9 PASANG TRAFO 20 WATT 14 BUAH RP.
10 PASANG STARTER 20 WATT 14 BUAH RP.
11 PASANG FITTING PLAFON 20 BUAH RP.
12 PASANG LAMPU LIQUID 18 WATT 23 BUAH RP.
13 PASANG KABEL LAMPU TAMAN 15 METER RP.
14 PASANG SAKLAR KIPAS ANGIN LT. II 1 TITIK RP.
15 JASA PERBAIKAN LAMPU 72 TITIK RP.
16 JASA PERBAIKAN KIPAS ANGIN 2 TITIK RP.
17 JASA PASANG KABEL LAMPU TAMAN 15 TITIK RP.
18 JASA PASANG MCB BELBOT/TAMAN 3 TITIK RP.
TOTAL PEKERJAAN
JAMBI, 15 MEI 2006HORMAT KAMI, DISETUJUI OLEH
SUGIYONO SIHOMBING
PERINCIANANGGARAN BIAYA
PERBAIKAN DAN PENGGANTIAN TRAFO DAN LAMPUDI HALAMAN KANTOR PELAYANAN PAJAK
HARGA TOTAL
17,500 RP. 245,000
27,500 RP. 385,000
3,500 RP. 49,000
10,000 RP. 10,000
65,000 RP. 65,000
150,000 RP. 450,000
5,000 RP. 70,000
15,000 RP. 210,000
25,000 RP. 350,000
3,500 RP. 49,000
7,500 RP. 150,000
22,500 RP. 517,500
10,000 RP. 150,000
50,000 RP. 50,000
25,000 RP. 1,800,000
50,000 RP. 100,000
5,000 RP. 75,000
50,000 RP. 150,000
TOTAL PEKERJAAN RP. 4,875,500
DISETUJUI OLEH
SIHOMBING
PERINCIANANGGARAN BIAYA
INSTALASI LISTRIK BESERTA BAHAN KABEL DISTRIBUSIDI KOLAM RENANG KOTA BARU JAMBI
NO JENIS BARANG/INSTALASI/PEMASANGAN JUMLAH HARGA
1 MATERIAL KABEL NYY 4 X 120 MM2 353 METER RP.
2 PASANG 353 METER RP.
JUMLAH
KABEL DARI PANEL SDP I/SDP II KE DISTRIBUSI
3 MATERIAL 360 METER RP.
4 PASANG 360 METER RP.
JUMLAH
KABEL DARI PANEL PP.KO.LP.T KE DISTRIBUSI
5 MATERIAL 60 METER RP.
6 PASANG 60 METER RP.
JUMLAH
KABEL DARI PANEL PP.KRA/LP.F/PP.LI KE DISTRIBUSI
7 MATERIAL 100 METER RP.
8 PASANG 100 METER RP.
JUMLAH
9 MATERIAL 531 METER RP.
10 JASA 531 METER RP.
JUMLAH
PENERANGAN LAMPU LUAR TAMAN NYFGBY
11 INSTALASI KABEL LAMPU TAMAN 1 TITIK RP.
12 PASANG LAMPU TAMAN 1 TITIK RP.
JUMLAH
TOTAL PEKERJAAN
JAMBI, 29 MEI 2006HORMAT KAMI, DISETUJUI OLEH
SUGIYONO PAK SUSENO
KABEL NYY 4 X 120 MM2
KABEL NYFGBY 4 X 50 MM2
KABEL NYFGBY 4 X 50 MM2
KABEL NYFGBY 4 X 10 MM2
KABEL NYFGBY 4 X 10 MM2
KABEL NYFGBY 4 X 6 MM2
KABEL NYFGBY 4 X 6 MM2
KABEL DARI PANEL LP.PL2/LP.KRA/PP.KO/LP.PL1/LP-B/PP-ACT/PP-AIR/PP-BEEP/LP-KD/LP-K/LP-ME/PP-KA KE DISTRIBUSI
KABEL NYFGBY 4 X 4 MM2
KABEL NYFGBY 4 X 4 MM2
PIMPINAN PROYEK PT. WIKA
PERINCIANANGGARAN BIAYA
INSTALASI LISTRIK BESERTA BAHAN KABEL DISTRIBUSIDI KOLAM RENANG KOTA BARU JAMBI
HARGA TOTAL
550,000 RP. 194,150,000
100,000 RP. 35,300,000
JUMLAH RP. 229,450,000
KABEL DARI PANEL SDP I/SDP II KE DISTRIBUSI
275,000 RP. 99,000,000
50,000 RP. 18,000,000
JUMLAH RP. 117,000,000
KABEL DARI PANEL PP.KO.LP.T KE DISTRIBUSI
75,000 RP. 4,500,000
25,000 RP. 1,500,000
JUMLAH RP. 6,000,000
KABEL DARI PANEL PP.KRA/LP.F/PP.LI KE DISTRIBUSI
60,000 RP. 6,000,000
20,000 RP. 2,000,000
JUMLAH RP. 8,000,000
50,000 RP. 26,550,000
20,000 RP. 10,620,000
JUMLAH RP. 37,170,000
PENERANGAN LAMPU LUAR TAMAN NYFGBY
600,000 RP. 600,000
300,000 RP. 300,000
JUMLAH RP. 900,000
TOTAL PEKERJAAN RP. 392,520,000
DISETUJUI OLEH
PAK SUSENO
KABEL DARI PANEL LP.PL2/LP.KRA/PP.KO/LP.PL1/LP-B/PP-ACT/PP-AIR/PP-BEEP/LP-KD/
PIMPINAN PROYEK PT. WIKA
PERINCIANANGGARAN BIAYA
INSTALASI LISTRIK BESERTA BAHAN SAKLAR GIFSAL PUTIH DAN KABEL NYMDI KOLAM RENANG KOTA BARU JAMBI
NO JENIS BARANG/INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL
PENERANGAN LP-T RG. TRIBUN
1 INSTALASI LAMPU TAMAN 113 TITIK RP. 115,000 RP. 12,995,000
2 INSTALASI STOP KONTAK 22 TITIK RP. 115,000 RP. 2,530,000
3 PASANG EXHAUST FAN 7 TITIK RP. 115,000 RP. 805,000
4 PASANG HALOGEN SOROT 500 W 3 TITIK RP. 115,000 RP. 345,000
JUMLAH RP. 16,675,000
PENERANGAN KOLAM RENANG OLYMPIC
5 INSTALASI LAMPU 24 TITIK RP. 115,000 RP. 2,760,000
JUMLAH RP. 2,760,000
PENERANGAN LP-F-RG. FITNESS
6 INSTALASI LAMPU 39 TITIK RP. 115,000 RP. 4,485,000
7 INSTALASI STOP KONTAK 6 TITIK RP. 115,000 RP. 690,000
8 INSTALASI KABEL AC 3 TITIK RP. 250,000 RP. 750,000
9 INSTALASI EXHAUST FAN 4 TITIK RP. 115,000 RP. 460,000
JUMLAH RP. 6,385,000
PENERANGAN KOLAM DEWASA
10 INSTALASI LAMPU 26 METER RP. 115,000 RP. 2,990,000
JUMLAH RP. 2,990,000
PENERANGAN LAMPU KOLAM LONCAT INDAH
11 INSTALASI LAMPU 12 METER RP. 115,000 RP. 1,380,000
JUMLAH RP. 1,380,000
PENERANGAN KOLAM RENANG ANAK
12 INSTALASI LAMPU 18 TITIK RP. 115,000 RP. 2,070,000
13 INSTALASI STOP KONTAK 1 TITIK RP. 115,000 RP. 115,000
JUMLAH RP. 2,185,000
PENERANGAN LP-B.2
14 INSTALASI LAMPU 55 TITIK RP. 115,000 RP. 6,325,000
15 INSTALASI EXHAUST FAN 9 TITIK RP. 115,000 RP. 1,035,000
JUMLAH RP. 7,360,000
ENERANGAN LP-KD/LP-KA
14 INSTALASI LAMPU 19 TITIK RP. 115,000 RP. 2,185,000
15 INSTALASI STOP KONTAK 2 TITIK RP. 115,000 RP. 230,000
JUMLAH RP. 2,415,000
PENERANGAN LP-ME
1 INSTALASI LAMPU 8 TITIK RP. 115,000 RP. 920,000
2 INSTALASI STOP KONTAK 4 TITIK RP. 115,000 RP. 460,000
3 PASANG EXHAUST FAN 1 TITIK RP. 115,000 RP. 115,000
4 PASANG KIPAS ANGIN 1 TITIK RP. 115,000 RP. 115,000
JUMLAH RP. 1,610,000
PENERANGAN LP-B-RG. BILAS
1 INSTALASI LAMPU 62 TITIK RP. 115,000 RP. 7,130,000
2 INSTALASI STOP KONTAK 7 TITIK RP. 115,000 RP. 805,000
3 PASANG KABEL AC 2 TITIK RP. 250,000 RP. 500,000
4 PASANG EXHAUST FAN 9 TITIK RP. 115,000 RP. 1,035,000
JUMLAH RP. 9,470,000
TOTAL PEKERJAAN RP. 53,230,000
JAMBI, 29 MEI 2006HORMAT KAMI, DISETUJUI OLEH
SUGIYONO PAK SUSENOPIMPINAN PROYEK PT. WIKA
PERINCIANANGGARAN BIAYA
INSTALASI LISTRIK BESERTA BAHAN PANEL INDUK DISTRIBUSIDI KOLAM RENANG KOTA BARU JAMBI
NO JENIS BARANG/INSTALASI/PEMASANGAN JUMLAH HARGA TOTAL
PANEL DISTRIBUSI INDUK
1 MATERIAL PANEL BOX 100 X 150 CM 1 BUAH RP. 1,500,000 RP. 1,500,000
2 MATERIAL NOPIYOS BELSEKKER 250 A 2 BUAH RP. 2,000,000 RP. 4,000,000
3 MATERIAL NOPIYOS BELSEKKER 125 A 2 BUAH RP. 1,750,000 RP. 3,500,000
4 MATERIAL MCB 3 PASS 20A + 25A 10 BUAH RP. 250,000 RP. 2,500,000
5 MATERIAL MCB 1 PASS 6A 6 BUAH RP. 75,000 RP. 450,000
6 MATERIAL POL AMPER 250A 6 METER RP. 200,000 RP. 1,200,000
7 MATERIAL POL METER 2 BUAH RP. 200,000 RP. 400,000
8 MATERIAL HZ 2 BUAH RP. 200,000 RP. 400,000
9 MATERIAL RST SAKLAR 2 BUAH RP. 250,000 RP. 500,000
10 MATERIAL CT 6 BUAH RP. 250,000 RP. 1,500,000
11 MATERIAL PILOT LEM 6 BUAH RP. 25,000 RP. 150,000
12 MATERIAL REL MCB 6 BATANG RP. 25,000 RP. 150,000
13 MATERIAL PIYOS BASKOPR 5 BATANG RP. 250,000 RP. 1,250,000
14 MATERIAL 100 BUAH RP. 2,500 RP. 250,000
15 MATERIAL SELONGSONG SELKON 100 BUAH RP. 2,500 RP. 250,000
16 MATERIAL OM SAKLAR GERMANY 400A 1 METER RP. 4,500,000 RP. 4,500,000
17 JASA PASANG PANEL INDUK 1 SET RP. 2,500,000 RP. 2,500,000
JUMLAH RP. 25,000,000
PANEL DISTRIBUSI 2 - SDP-I
18 MATERIAL BOX PANEL 40 X 60 1 BUAH RP. 500,000 RP. 500,000
19 MATERIAL NOPIYOS BELSEKER 100A 1 BUAH RP. 1,250,000 RP. 1,250,000
20 MATERIAL MCB 3 PASS 40A 5 BUAH RP. 250,000 RP. 1,250,000
21 MATERIAL MCB 1 PASS 6A 6 BUAH RP. 75,000 RP. 450,000
22 MATERIAL PIYOS BARNOL/GROUND 2 BUAH RP. 75,000 RP. 150,000
23 MATERIAL PILOT LEM 3 BUAH RP. 25,000 RP. 75,000
24 MATERIAL REL MCB 2A 1 BATANG RP. 25,000 RP. 25,000
25 MATERIAL 20 METER RP. 25,000 RP. 500,000
26 MATERIAL 20 BUAH RP. 2,500 RP. 50,000
27 JASA PASANG GROUND 1 SET RP. 250,000 RP. 250,000
21 JASA PASANG PANEL 1 SET RP. 1,000,000 RP. 1,000,000
JUMLAH RP. 5,500,000
PANEL DISTRIBUSI 2 - SDP-II
22 MATERIAL BOX PANEL 40 X 50 1 BUAH RP. 500,000 RP. 500,000
23 MATERIAL NOPIYOS BELSEKER 100A 1 BUAH RP. 1,250,000 RP. 1,250,000
24 MATERIAL MCB 3 PASS 40A 4 BUAH RP. 250,000 RP. 1,000,000
25 MATERIAL MCB 1 PASS 6A 6 BUAH RP. 75,000 RP. 450,000
26 MATERIAL PIYOS BARNOL/GROUND 2 BUAH RP. 75,000 RP. 150,000
27 MATERIAL PILOT LEM 3 BUAH RP. 25,000 RP. 75,000
28 MATERIAL REL MCB 2A 1 BATANG RP. 25,000 RP. 25,000
29 MATERIAL 20 METER RP. 25,000 RP. 500,000
30 MATERIAL 20 BUAH RP. 2,500 RP. 50,000
31 JASA PASANG GROUND 1 SET RP. 250,000 RP. 250,000
25 JASA PASANG PANEL 1 SET RP. 1,000,000 RP. 1,000,000
JUMLAH RP. 5,250,000
TOTAL PEKERJAAN RP. 35,750,000
JAMBI, 29 MEI 2006HORMAT KAMI, DISETUJUI OLEH
SUGIYONO PAK SUSENOPIMPINAN PROYEK PT. WIKA
SELKON 50M2 - 250M2
KABEL GROUND 1 X 25M2
SELKON 50M2
KABEL GROUND 1 X 25M2
SELKON 50M2
PERINCIANANGGARAN BIAYA
INSTALASI LISTRIK BESERTA BAHAN PANEL MCB GLIFSALDI KOLAM RENANG KOTA BARU JAMBI
NO JENIS BARANG/INSTALASI/PEMASANGAN JUMLAH HARGA
PANEL PENERANGAN LP-KD KOLAM DEWASA
1 MATERIAL PANEL BOX 30 X 40 1 BUAH RP. 400,000
2 MATERIAL MCB 3 PASS 10A 1 BUAH RP. 250,000
3 MATERIAL MCB 1 PASS 10A 3 BUAH RP. 75,000
4 MATERIAL MCB 1 PASS 6A 6 BUAH RP. 75,000
5 MATERIAL PILOT LEM 3 BUAH RP. 25,000
6 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000
7 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000
8 MATERIAL REL MCB 1 BATANG RP. 25,000
9 MATERIAL 10 METER RP. 15,000
10 JASA PASANG PANEL 1 SET RP. 500,000
11 JASA PASANG GROUND 1 SET RP. 200,000
JUMLAH
PANEL PENERANGAN LP-B-RG BILAS
12 MATERIAL PANEL BOX 40 X 50 1 BUAH RP. 450,000
13 MATERIAL MCB 3 PASS 16A 1 BUAH RP. 250,000
14 MATERIAL MCB 1 PASS 10A 6 BUAH RP. 75,000
15 MATERIAL MCB 1 PASS 6A 9 BUAH RP. 75,000
16 MATERIAL PILOT LEM 2A 3 BUAH RP. 25,000
17 MATERIAL MCB 1 PASS 2A 3 BUAH RP. 25,000
18 MATERIAL PIYOS BARNOL/GROUND 2 BUAH RP. 75,000
19 MATERIAL SICER MCB 2 BATANG RP. 25,000
20 MATERIAL REL MCB 1 BATANG RP. 25,000
21 MATERIAL 20 METER RP. 15,000
22 JASA PASANG PANEL 1 SET RP. 1,000,000
23 JASA PASANG GROUND 1 SET RP. 350,000
JUMLAH
PANEL PENERANGAN LP-F-RG FITNESS
24 MATERIAL PANEL BOX 30 X 40 1 BUAH RP. 400,000
25 MATERIAL MCB 3 PASS 10A 1 BUAH RP. 250,000
26 MATERIAL MCB 1 PASS 10A 6 BUAH RP. 75,000
27 MATERIAL MCB 1 PASS 6A 6 BUAH RP. 75,000
28 MATERIAL PILOT LEM 2A 3 BUAH RP. 25,000
29 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000
30 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000
31 MATERIAL SICER MCB 1 BATANG RP. 25,000
32 MATERIAL REL MCB 1 BATANG RP. 25,000
KABEL GROUND 1 X 6MM2
KABEL GROUND 1 X 6MM2
33 MATERIAL 10 METER RP. 15,000
34 JASA PASANG PANEL 1 SET RP. 500,000
35 JASA PASANG GROUND 1 SET RP. 200,000
JUMLAH
KABEL GROUND 1 X 6MM2
PANEL PENERANGAN LP-T-RG TRIBUN
36 MATERIAL PANEL BOX 40 X 60 1 BUAH RP. 500,000
37 MATERIAL MCB 3 PASS 16A 1 BUAH RP. 250,000
38 MATERIAL MCB 1 PASS 10A 7 BUAH RP. 75,000
39 MATERIAL MCB 1 PASS 6A 20 BUAH RP. 75,000
40 MATERIAL PILOT LEM 2A 3 BUAH RP. 25,000
41 MATERIAL MCB 1 PASS 2A 3 BUAH RP. 25,000
42 MATERIAL PIYOS BARNOL/GROUND 2 BUAH RP. 75,000
43 MATERIAL SICER MCB 3 BATANG RP. 25,000
44 MATERIAL REL MCB 2 BATANG RP. 25,000
45 MATERIAL 20 METER RP. 15,000
46 JASA PASANG PANEL 1 SET RP. 1,000,000
47 JASA PASANG GROUND 1 SET RP. 350,000
JUMLAH
PANEL PENERANGAN LP-KRA KOLAM
48 MATERIAL PANEL BOX 30 X 40 1 BUAH RP. 400,000
49 MATERIAL MCB 3 PASS 10A 1 BUAH RP. 250,000
50 MATERIAL MCB 1 PASS 10A 3 BUAH RP. 75,000
51 MATERIAL MCB 1 PASS 6A 6 BUAH RP. 75,000
52 MATERIAL PILOT LEM 3 BUAH RP. 25,000
53 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000
54 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000
55 MATERIAL SICER MCB 1 BATANG RP. 25,000
56 MATERIAL REL MCB 1 BATANG RP. 25,000
57 MATERIAL 10 METER RP. 15,000
58 JASA PASANG PANEL 1 SET RP. 500,000
59 JASA PASANG GROUND 1 SET RP. 200,000
JUMLAH
PANEL PENERANGAN LP-LI KOLAM LONCAT INDAH
60 MATERIAL PANEL BOX 30 X 40 1 BUAH RP. 400,000
61 MATERIAL MCB 3 PASS 10A 1 BUAH RP. 250,000
62 MATERIAL MCB 1 PASS 10A 3 BUAH RP. 75,000
63 MATERIAL MCB 1 PASS 6A 6 BUAH RP. 75,000
64 MATERIAL PILOT LEM 2A 3 BUAH RP. 25,000
65 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000
66 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000
67 MATERIAL REL MCB 1 BATANG RP. 25,000
68 MATERIAL 10 METER RP. 15,000
69 JASA PASANG PANEL 1 SET RP. 500,000
70 JASA PASANG GROUND 1 SET RP. 200,000
JUMLAH
KABEL GROUND 1 X 6MM2
KABEL GROUND 1 X 6MM2
KABEL GROUND 1 X 6MM2
PANEL PENERANGAN LP-K-KOLAM OLYMPIC
71 MATERIAL PANEL BOX 30 X 40 1 BUAH RP. 400,000
72 MATERIAL MCB 3 PASS 10A 1 BUAH RP. 250,000
73 MATERIAL MCB 1 PASS 10A 3 BUAH RP. 75,000
74 MATERIAL MCB 1 PASS 6A 9 BUAH RP. 75,000
75 MATERIAL PILOT LEM 3 BUAH RP. 25,000
76 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000
77 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000
78 MATERIAL SICER MCB 1 BATANG RP. 25,000
79 MATERIAL REL MCB 1 BATANG RP. 25,000
80 MATERIAL 10 METER RP. 15,000
81 JASA PASANG PANEL 1 SET RP. 500,000
82 JASA PASANG GROUND 1 SET RP. 200,000
JUMLAH
PANEL PENERANGAN LP-ME
83 MATERIAL PANEL BOX 25 X 30 1 BUAH RP. 350,000
84 MATERIAL MCB 3 PASS 10A 1 BUAH RP. 250,000
85 MATERIAL MCB 1 PASS 10A 1 BUAH RP. 75,000
86 MATERIAL MCB 1 PASS 6A 5 BUAH RP. 75,000
87 MATERIAL PILOT LEM 3 BUAH RP. 25,000
88 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000
89 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000
90 MATERIAL SICER MCB 1 BATANG RP. 25,000
91 MATERIAL REL MCB 1 BATANG RP. 25,000
92 MATERIAL 10 METER RP. 15,000
93 JASA PASANG PANEL 1 SET RP. 500,000
94 JASA PASANG GROUND 1 SET RP. 200,000
JUMLAH
PANEL PENERANGAN LUAR 1-LP-PL 1
95 MATERIAL PANEL BOX 30 X 40 1 BUAH RP. 400,000
96 MATERIAL MCB 3 PASS 16A 1 BUAH RP. 250,000
97 MATERIAL MCB 1 PASS 10A 3 BUAH RP. 75,000
98 MATERIAL MCB 1 PASS 6A 3 BUAH RP. 75,000
99 MATERIAL CONTEXTOR 3 PASS 1 BUAH RP. 500,000
100 MATERIAL TIMER 5A 1 BUAH RP. 450,000
101 MATERIAL PILOT LEM 2 A 3 BUAH RP. 25,000
102 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000
103 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000
104 MATERIAL REL MCB 1 BATANG RP. 25,000
105 MATERIAL 10 METER RP. 15,000
106 JASA PASANG PANEL 1 SET RP. 500,000
107 JASA PASANG GROUND 1 SET RP. 200,000
KABEL GROUND 1 X 6MM2
KABEL GROUND 1 X 6MM2
KABEL GROUND 1 X 6MM2
JUMLAH
PANEL PENERANGAN LUAR 2-LP-PL 2
108 MATERIAL PANEL BOX 30 X 40 1 BUAH RP. 400,000
109 MATERIAL MCB 3 PASS 16A 1 BUAH RP. 250,000
110 MATERIAL MCB 1 PASS 10A 3 BUAH RP. 75,000
111 MATERIAL MCB 1 PASS 6A 3 BUAH RP. 75,000
112 MATERIAL CONTEXTOR 3 PASS 1 BUAH RP. 500,000
113 MATERIAL TIMER 5A 1 BUAH RP. 450,000
114 MATERIAL PILOT LEM 2 A 3 BUAH RP. 25,000
115 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000
116 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000
117 MATERIAL REL MCB 1 BATANG RP. 25,000
118 MATERIAL 10 METER RP. 15,000
119 JASA PASANG PANEL 1 SET RP. 500,000
120 JASA PASANG GROUND 1 SET RP. 200,000
JUMLAH
BOX PANEL PP AIR BERSIH
121 MATERIAL PANEL BOX 30 X 40 1 BUAH RP. 400,000
122 MATERIAL CONTEXTOR 32A 1 BUAH RP. 600,000
123 MATERIAL OPR LOT 25A 1 BUAH RP. 200,000
124 MATERIAL OMERON 25A 1 BUAH RP. 200,000
125 MATERIAL KABEL GROUND 1 X 6MM2 10 METER RP. 15,000
126 MATERIAL MCB 3 PASS 32A 1 BUAH RP. 250,000
127 MATERIAL PELAMPUNG 1 BUAH RP. 150,000
128 MATERIAL PILOT LEM 3 BUAH RP. 25,000
129 MATERIAL TERMINAL 1 BATANG RP. 25,000
130 MATERIAL KABEL PELAMPUNG 50 METER RP. 2,500
131 JASA PASANG PANEL 1 SET RP. 500,000
132 JASA PASANG GROUND 1 SET RP. 200,000
JUMLAH
PANEL PENERANGAN DEEP WELL
133 MATERIAL PANEL BOX 25 X 30 1 BUAH RP. 350,000
134 MATERIAL MCB 3 PASS 16A 1 BUAH RP. 250,000
135 MATERIAL MCB 1 PASS 10A 3 BUAH RP. 75,000
136 MATERIAL MCB 1 PASS 6A 3 BUAH RP. 75,000
137 MATERIAL PILOT LEM 3 BUAH RP. 25,000
138 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000
139 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000
140 MATERIAL SICER MCB 1 BATANG RP. 25,000
141 MATERIAL REL MCB 1 BATANG RP. 25,000
142 MATERIAL 10 METER RP. 15,000
143 JASA PASANG PANEL 1 SET RP. 500,000
144 JASA PASANG GROUND 1 SET RP. 200,000
KABEL GROUND 1 X 6MM2
KABEL GROUND 1 X 6MM2
JUMLAH
KABEL WIRING PANEL PP-DEEP WELL
145 MATERIAL KABEL NYY 3 X 2,5MM 6 METER RP. 15,000
146 JASA PASANG KABEL 6 METER RP. 15,000
JUMLAH
PANEL PP-KRA-KOLAM RENANG ANAK
147 MATERIAL PANEL BOX 25 X 30 1 BUAH RP. 350,000
148 MATERIAL MCB 3 PASS 32A 1 BUAH RP. 250,000
149 MATERIAL MCB 1 PASS 10A 6 BUAH RP. 75,000
150 MATERIAL MCB 1 PASS 6A 3 BUAH RP. 75,000
151 MATERIAL PILOT LEM 3 BUAH RP. 25,000
152 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000
153 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000
154 MATERIAL SICER MCB 1 BATANG RP. 25,000
155 MATERIAL REL MCB 1 BATANG RP. 25,000
156 MATERIAL 10 METER RP. 15,000
157 JASA PASANG PANEL 1 SET RP. 500,000
158 JASA PASANG GROUND 1 SET RP. 200,000
JUMLAH
KABEL WIRING PANEL PP-KRA-KOLAM RENANG ANAK
159 MATERIAL KABEL NYY 3 X 2,5MM 11 METER RP. 15,000
160 JASA PASANG KABEL 11 METER RP. 15,000
JUMLAH
PANEL PP-KO-KOLAM OLYMPIC
161 MATERIAL PANEL BOX 25 X 30 1 BUAH RP. 350,000
162 MATERIAL MCB 3 PASS 32A 1 BUAH RP. 250,000
163 MATERIAL MCB 1 PASS 10A 6 BUAH RP. 75,000
164 MATERIAL MCB 1 PASS 6A 3 BUAH RP. 75,000
165 MATERIAL PILOT LEM 3 BUAH RP. 25,000
166 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000
167 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000
168 MATERIAL SICER MCB 1 BATANG RP. 25,000
169 MATERIAL REL MCB 1 BATANG RP. 25,000
170 MATERIAL 10 METER RP. 15,000
171 JASA PASANG PANEL 1 SET RP. 500,000
172 JASA PASANG GROUND 1 SET RP. 200,000
JUMLAH
KABEL WIRING PANEL PP-KO-KOLAM OLYMPIC
173 MATERIAL KABEL NYY 3 X 2,5MM 16.5 METER RP. 15,000
174 JASA PASANG KABEL 16.5 METER RP. 15,000
JUMLAH
PANEL PP-LI-LONCAT INDAH
175 MATERIAL PANEL BOX 25 X 30 1 BUAH RP. 350,000
176 MATERIAL MCB 3 PASS 32A 1 BUAH RP. 250,000
177 MATERIAL MCB 1 PASS 10A 6 BUAH RP. 75,000
178 MATERIAL MCB 1 PASS 6A 3 BUAH RP. 75,000
179 MATERIAL PILOT LEM 3 BUAH RP. 25,000
KABEL GROUND 1 X 6MM2
KABEL GROUND 1 X 6MM2
180 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000
181 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000
182 MATERIAL SICER MCB 1 BATANG RP. 25,000
183 MATERIAL REL MCB 1 BATANG RP. 25,000
184 MATERIAL 10 METER RP. 15,000
185 JASA PASANG PANEL 1 SET RP. 500,000
186 JASA PASANG GROUND 1 SET RP. 200,000
JUMLAH
KABEL GROUND 1 X 6MM2
KABEL WIRING PANEL PP-LI-LONCAT INDAH
187 MATERIAL KABEL NYY 3 X 2,5MM 16.5 METER RP. 15,000
188 JASA PASANG KABEL 16.5 METER RP. 15,000
JUMLAH
PANEL PP-KD KOLAM DEWASA
175 MATERIAL PANEL BOX 25 X 30 1 BUAH RP. 350,000
176 MATERIAL MCB 3 PASS 40A 1 BUAH RP. 250,000
177 MATERIAL MCB 1 PASS 10A 6 BUAH RP. 75,000
178 MATERIAL MCB 1 PASS 6A 3 BUAH RP. 75,000
179 MATERIAL PILOT LEM 3 BUAH RP. 25,000
180 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000
181 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000
182 MATERIAL SICER MCB 1 BATANG RP. 25,000
183 MATERIAL REL MCB 1 BATANG RP. 25,000
184 MATERIAL 10 METER RP. 15,000
185 JASA PASANG PANEL 1 SET RP. 500,000
186 JASA PASANG GROUND 1 SET RP. 200,000
JUMLAH
KABEL WIRING PANEL PP-KD KOLAM DEWASA
187 MATERIAL KABEL NYY 3 X 2,5MM 16.5 METER RP. 15,000
188 JASA PASANG KABEL 16.5 METER RP. 15,000
JUMLAH
PANEL PP-KA KOLAM ANAK
189 MATERIAL PANEL BOX 25 X 30 1 BUAH RP. 350,000
190 MATERIAL MCB 3 PASS 16A 1 BUAH RP. 250,000
191 MATERIAL MCB 1 PASS 10A 3 BUAH RP. 75,000
192 MATERIAL MCB 1 PASS 6A 3 BUAH RP. 75,000
193 MATERIAL PILOT LEM 3 BUAH RP. 25,000
194 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000
195 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000
196 MATERIAL SICER MCB 1 BATANG RP. 25,000
197 MATERIAL REL MCB 1 BATANG RP. 25,000
198 MATERIAL 10 METER RP. 15,000
199 JASA PASANG PANEL 1 SET RP. 500,000
200 JASA PASANG GROUND 1 SET RP. 200,000
JUMLAH
KABEL WIRING PANEL PP-KA KOLAM ANAK
201 MATERIAL KABEL NYY 3 X 2,5MM 5.5 METER RP. 15,000
202 JASA PASANG KABEL 5.5 METER RP. 15,000
JUMLAH
KABEL GROUND 1 X 6MM2
KABEL GROUND 1 X 6MM2
PANEL PP-AIR BERSIH
203 MATERIAL PANEL BOX 25 X 30 1 BUAH RP. 350,000
204 MATERIAL MCB 3 PASS 40A 1 BUAH RP. 250,000
205 MATERIAL MCB 1 PASS 10A 6 BUAH RP. 75,000
206 MATERIAL MCB 1 PASS 6A 3 BUAH RP. 75,000
207 MATERIAL PILOT LEM 3 BUAH RP. 25,000
208 MATERIAL SEKERING PIYOS 2A 3 BUAH RP. 10,000
209 MATERIAL PIYOS GROUND 2 BATANG RP. 75,000
210 MATERIAL SICER MCB 1 BATANG RP. 25,000
211 MATERIAL REL MCB 1 BATANG RP. 25,000
212 MATERIAL 10 METER RP. 15,000
213 JASA PASANG PANEL 1 SET RP. 500,000
214 JASA PASANG GROUND 1 SET RP. 200,000
JUMLAH
KABEL WIRING PANEL PANEL PP-AIR BERSIH
215 MATERIAL KABEL NYY 3 X 2,5MM 15 METER RP. 15,000
216 JASA PASANG KABEL 15 METER RP. 15,000
JUMLAH
TOTAL PEKERJAAN
JAMBI, 29 MEI 2006HORMAT KAMI, DISETUJUI OLEH
SUGIYONO PAK SUSENOPIMPINAN PROYEK PT. WIKA
KABEL GROUND 1 X 6MM2
PERINCIANANGGARAN BIAYA
INSTALASI LISTRIK BESERTA BAHAN PANEL MCB GLIFSALDI KOLAM RENANG KOTA BARU JAMBI
TOTAL
PANEL PENERANGAN LP-KD KOLAM DEWASA
RP. 400,000
RP. 250,000
RP. 225,000
RP. 450,000
RP. 75,000
RP. 30,000
RP. 150,000
RP. 25,000
RP. 150,000
RP. 500,000
RP. 200,000
RP. 2,455,000
PANEL PENERANGAN LP-B-RG BILAS
RP. 450,000
RP. 250,000
RP. 450,000
RP. 675,000
RP. 75,000
RP. 75,000
RP. 150,000
RP. 50,000
RP. 25,000
RP. 300,000
RP. 1,000,000
RP. 350,000
RP. 3,850,000
PANEL PENERANGAN LP-F-RG FITNESS
RP. 400,000
RP. 250,000
RP. 450,000
RP. 450,000
RP. 75,000
RP. 30,000
RP. 150,000
RP. 25,000
RP. 25,000
RP. 150,000
RP. 500,000
RP. 200,000
RP. 2,705,000
PANEL PENERANGAN LP-T-RG TRIBUN
RP. 500,000
RP. 250,000
RP. 525,000
RP. 1,500,000
RP. 75,000
RP. 75,000
RP. 150,000
RP. 75,000
RP. 50,000
RP. 300,000
RP. 1,000,000
RP. 350,000
RP. 4,850,000
PANEL PENERANGAN LP-KRA KOLAM
RP. 400,000
RP. 250,000
RP. 225,000
RP. 450,000
RP. 75,000
RP. 30,000
RP. 150,000
RP. 25,000
RP. 25,000
RP. 150,000
RP. 500,000
RP. 200,000
RP. 2,480,000
PANEL PENERANGAN LP-LI KOLAM LONCAT INDAH
RP. 400,000
RP. 250,000
RP. 225,000
RP. 450,000
RP. 75,000
RP. 30,000
RP. 150,000
RP. 25,000
RP. 150,000
RP. 500,000
RP. 200,000
RP. 2,455,000
PANEL PENERANGAN LP-K-KOLAM OLYMPIC
RP. 400,000
RP. 250,000
RP. 225,000
RP. 675,000
RP. 75,000
RP. 30,000
RP. 150,000
RP. 25,000
RP. 25,000
RP. 150,000
RP. 500,000
RP. 200,000
RP. 2,705,000
PANEL PENERANGAN LP-ME
RP. 350,000
RP. 250,000
RP. 75,000
RP. 375,000
RP. 75,000
RP. 30,000
RP. 150,000
RP. 25,000
RP. 25,000
RP. 150,000
RP. 500,000
RP. 200,000
RP. 2,205,000
PANEL PENERANGAN LUAR 1-LP-PL 1
RP. 400,000
RP. 250,000
RP. 225,000
RP. 225,000
RP. 500,000
RP. 450,000
RP. 75,000
RP. 30,000
RP. 150,000
RP. 25,000
RP. 150,000
RP. 500,000
RP. 200,000
RP. 3,180,000
PANEL PENERANGAN LUAR 2-LP-PL 2
RP. 400,000
RP. 250,000
RP. 225,000
RP. 225,000
RP. 500,000
RP. 450,000
RP. 75,000
RP. 30,000
RP. 150,000
RP. 25,000
RP. 150,000
RP. 500,000
RP. 200,000
RP. 3,180,000
BOX PANEL PP AIR BERSIH
RP. 400,000
RP. 600,000
RP. 200,000
RP. 200,000
RP. 150,000
RP. 250,000
RP. 150,000
RP. 75,000
RP. 25,000
RP. 125,000
RP. 500,000
RP. 200,000
RP. 2,875,000
PANEL PENERANGAN DEEP WELL
RP. 350,000
RP. 250,000
RP. 225,000
RP. 225,000
RP. 75,000
RP. 30,000
RP. 150,000
RP. 25,000
RP. 25,000
RP. 150,000
RP. 500,000
RP. 200,000
RP. 2,205,000
KABEL WIRING PANEL PP-DEEP WELL
RP. 90,000
RP. 90,000
RP. 180,000
PANEL PP-KRA-KOLAM RENANG ANAK
RP. 350,000
RP. 250,000
RP. 450,000
RP. 225,000
RP. 75,000
RP. 30,000
RP. 150,000
RP. 25,000
RP. 25,000
RP. 150,000
RP. 500,000
RP. 200,000
RP. 2,430,000
KABEL WIRING PANEL PP-KRA-KOLAM RENANG ANAK
RP. 165,000
RP. 165,000
RP. 330,000
PANEL PP-KO-KOLAM OLYMPIC
RP. 350,000
RP. 250,000
RP. 450,000
RP. 225,000
RP. 75,000
RP. 30,000
RP. 150,000
RP. 25,000
RP. 25,000
RP. 150,000
RP. 500,000
RP. 200,000
RP. 2,430,000
KABEL WIRING PANEL PP-KO-KOLAM OLYMPIC
RP. 247,500
RP. 247,500
RP. 495,000
PANEL PP-LI-LONCAT INDAH
RP. 350,000
RP. 250,000
RP. 450,000
RP. 225,000
RP. 75,000
RP. 30,000
RP. 150,000
RP. 25,000
RP. 25,000
RP. 150,000
RP. 500,000
RP. 200,000
RP. 2,430,000
KABEL WIRING PANEL PP-LI-LONCAT INDAH
RP. 247,500
RP. 247,500
RP. 495,000
PANEL PP-KD KOLAM DEWASA
RP. 350,000
RP. 250,000
RP. 450,000
RP. 225,000
RP. 75,000
RP. 30,000
RP. 150,000
RP. 25,000
RP. 25,000
RP. 150,000
RP. 500,000
RP. 200,000
RP. 2,430,000
KABEL WIRING PANEL PP-KD KOLAM DEWASA
RP. 247,500
RP. 247,500
RP. 495,000
PANEL PP-KA KOLAM ANAK
RP. 350,000
RP. 250,000
RP. 225,000
RP. 225,000
RP. 75,000
RP. 30,000
RP. 150,000
RP. 25,000
RP. 25,000
RP. 150,000
RP. 500,000
RP. 200,000
RP. 2,205,000
KABEL WIRING PANEL PP-KA KOLAM ANAK
RP. 82,500
RP. 82,500
RP. 165,000
PANEL PP-AIR BERSIH
RP. 350,000
RP. 250,000
RP. 450,000
RP. 225,000
RP. 75,000
RP. 30,000
RP. 150,000
RP. 25,000
RP. 25,000
RP. 150,000
RP. 500,000
RP. 200,000
RP. 2,430,000
KABEL WIRING PANEL PANEL PP-AIR BERSIH
RP. 225,000
RP. 225,000
RP. 450,000
RP. 52,110,000
DISETUJUI OLEH
PAK SUSENOPIMPINAN PROYEK PT. WIKA
PERINCIANANGGARAN BIAYA
INSTALASI LISTRIKDI KOLAM RENANG KOTA BARU JAMBI
NO JENIS BARANG/INSTALASI/PEMASANGAN JUMLAH HARGA
1 TOTAL INSTALASI LISTRIK BESERTA BAHAN KABEL DISTRIBUSI
2
3 TOTAL INSTALASI LISTRIK BESERTA BAHAN PANEL INDUK DISTRIBUSI
4 TOTAL INSTALASI LISTRIK BESERTA BAHAN PANEL MCB GLIFSAL
TOTAL PEKERJAAN
JAMBI, 29 MEI 2006HORMAT KAMI, DISETUJUI OLEH
SUGIYONO PAK SUSENOPIMPINAN PROYEK PT. WIKA
TOTAL INSTALASI LISTRIK BESERTA BAHAN SAKLAR GIFSAL PUTIHDAN KABEL NYM
PERINCIANANGGARAN BIAYA
INSTALASI LISTRIKDI KOLAM RENANG KOTA BARU JAMBI
TOTAL
RP. 392,520,000
RP. 53,230,000
RP. 35,750,000
RP. 52,110,000
RP. 533,610,000
DISETUJUI OLEH
PAK SUSENOPIMPINAN PROYEK PT. WIKA
ORDER KABELUNTUK KOLAM RENANG
TANGO RAJO JAMBI
NO NAMA BARANG SPESIFIKASI JUMLAH
1 KABEL NYY 4 X 120 40
2 KABEL NYFGBY 4 X 50 375
3 KABEL NYFGBY 4 X 25 40
4 KABEL NYFGBY 4 X 10 1
5 KABEL NYFGBY 4 X 6 2
6 KABEL NYFGBY 4 X 4 16
7 KABEL NYFGBY 3 X 4 6
8 KABEL NYFGBY 2 X 4 5
9 KABEL NYY 3 X 2,5 2
10 SOLASI BAN 3M,TM 23 RUBBER 2
21 JULI 2006HORMAT KAMI TTD
SUGIYONO PAK SUSENOPIMPINAN PROYEK PT. WIKA
ORDER KABELUNTUK KOLAM RENANG
TANGO RAJO JAMBI
JUMLAH
METER
METER
METER
ROLL
ROLL
ROLL
ROLL
ROLL
ROLL
ROLL
TTD
PAK SUSENOPIMPINAN PROYEK PT. WIKA
PERINCIANANGGARAN BIAYA
UNTUK KOLAM RENANGTANGGO RAJO JAMBI
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 PASANG KABEL 4 x 120 40 METER RP.
2 PASANG KABEL 4 x 50 375 METER RP.
3 PASANG KABEL 4 x 25 50 METER RP.
4 PASANG KABEL 4 x 10 100 METER RP.
5 PASANG KABEL 4 x 6 200 METER RP.
6 PASANG KABEL 2 x 4 500 METER RP.
7 PASANG KABEL 3 x 4 500 METER RP.
8 PASANG KABEL 3 x 2,5 300 METER RP.
9 PASANG KABEL 4 x 4 1300 METER RP.
TOTAL PEKERJAAN
JAMBI, 08 SEPTEMBER 2006HORMAT KAMI, TTD
SUGIYONO PAK SUSENOPIMPINAN PROYEK PT. WIKA
PERINCIANANGGARAN BIAYA
UNTUK KOLAM RENANGTANGGO RAJO JAMBI
HARGA TOTAL
100,000 RP. 4,000,000
50,000 RP. 18,750,000
25,000 RP. 1,250,000
20,000 RP. 2,000,000
15,000 RP. 3,000,000
15,000 RP. 7,500,000
15,000 RP. 7,500,000
15,000 RP. 4,500,000
15,000 RP. 19,500,000
TOTAL PEKERJAAN RP. 68,000,000
TTD
PAK SUSENOPIMPINAN PROYEK PT. WIKA
PERINCIANANGGARAN BIAYA
UNTUK KOLAM RENANGTANGGO RAJO JAMBI
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 PANEL INDOK 1 TITIK RP.
2 PANEL SDP I SDP II 2 TITIK RP.
3 PANEL POS 1 TITIK RP.
4 PANEL AIR 1 TITIK RP.
5 PANEL TEMER LP-PL I 1 TITIK RP.
6 PANEL SETOFPAN KWH 1 1 TITIK RP.
7 GRON PANEL DISTRIBUSI INDUK 1 TITIK RP.
8 GRON PANEL ATS 1 TITIK RP.
9 GRON PANEL TMR 1 TITIK RP.
10 GRON PANEL SDP I 1 TITIK RP.
11 GRON PANEL SDP II 1 TITIK RP.
12 GRON PANEL AIR BERSIH 1 TITIK RP.
13 GRON PANEL KWH 1 TITIK RP.
14 GRON PANEL POS 1 TITIK RP.
15 GRON GENSET 1 TITIK RP.
16 GRON BOX MCB CANTIN 1 TITIK RP.
17 LAMPU HIYAS 9 TITIK RP.
18 LAMPU TAMAN 54 TITIK RP.
19 LAMPU JALAN 7 TITIK RP.
20 PERBAIKI PANEL 3 SET RP.
21 PERBAIKI LAMPU 20 TITIK RP.
22 LAMPU R. BILAS WANITA 20 TITIK RP.
23 SETOF KONTAK R. BILAS WANITA 5 TITIK RP.
24 LAMPU R. KANTIN 5 TITIK RP.
25 SETOF KONTAK R. KANTIN 1 TITIK RP.
26 BOX MCB 1 TITIK RP.
27 LAMPU GAJIBU 5 TITIK RP.
28 LAMPU POS 5 TITIK RP.
29 SETOF KONTAK 2 TITIK RP.
30 BOX MCB 1 TITIK RP.
TOTAL PEKERJAAN
JAMBI, 08 SEPTEMBER 2006HORMAT KAMI, TTD
SUGIYONO PAK SUSENOPIMPINAN PROYEK PT. WIKA
PERINCIANANGGARAN BIAYA
UNTUK KOLAM RENANGTANGGO RAJO JAMBI
HARGA TOTAL
3,500,000 RP. 3,500,000
1,000,000 RP. 2,000,000
500,000 RP. 500,000
500,000 RP. 500,000
1,000,000 RP. 1,000,000
500,000 RP. 500,000
1,500,000 RP. 1,500,000
500,000 RP. 500,000
500,000 RP. 500,000
500,000 RP. 500,000
500,000 RP. 500,000
500,000 RP. 500,000
500,000 RP. 500,000
200,000 RP. 200,000
500,000 RP. 500,000
200,000 RP. 200,000
600,000 RP. 5,400,000
300,000 RP. 16,200,000
600,000 RP. 4,200,000
300,000 RP. 900,000
10,000 RP. 200,000
35,000 RP. 700,000
35,000 RP. 175,000
35,000 RP. 175,000
35,000 RP. 35,000
200,000 RP. 200,000
35,000 RP. 175,000
35,000 RP. 175,000
35,000 RP. 70,000
200,000 RP. 200,000
TOTAL PEKERJAAN RP. 42,205,000
TTD
PAK SUSENOPIMPINAN PROYEK PT. WIKA
DAFTAR GAJI HARIANUNTUK KOLAM RENANG
TANGGO RAJO JAMBI
NO NAMA BARANG PER HARI
1 PAK SUGIYONO 250,000 6
2 IBNU YASIN 75,000 6
3 BAGIO 75,000 6
4 SYAFRIZAL 100,000 5
5 UDIN 100,000 5
TOTAL
DAFTAR GAJI LEMBURUNTUK KOLAM RENANG
TANGGO RAJO JAMBI
NO NAMA BARANG PER HARI
1 PAK SUGIYONO 200,000 6
2 IBNU YASIN 50,000 6
3 BAGIO 50,000 6
4 SYAFRIZAL 80,000 5
5 UDIN 80,000 5
TOTAL
TOTAL HARIAN DAN LEMBUR
JAMBI, 08 SEPTEMBER 2006HORMAT KAMI TTD
SUGIYONO PAK SUSENOPIMPINAN PROYEK PT. WIKA
JUMLAHHARI
JUMLAHHARI
DAFTAR GAJI HARIANUNTUK KOLAM RENANG
TANGGO RAJO JAMBI
TOTAL
1,500,000
450,000
450,000
500,000
500,000
3,400,000
DAFTAR GAJI LEMBURUNTUK KOLAM RENANG
TANGGO RAJO JAMBI
TOTAL
1,200,000
300,000
300,000
400,000
400,000
2,600,000
6,000,000
TTD
PAK SUSENOPIMPINAN PROYEK PT. WIKA
PERINCIANANGGARAN BIAYA
INSTALASI LISTRIKDI KOTA BARU JAMBI
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI LAMPU 13 TITIK RP.
2 INSTALASI STOP KONTAK 11 TITIK RP.
3 INSTALASI EOSOPEN 1 TITIK RP.
4 INSTALASI KABEL AC 1 TITIK RP.
TOTAL
JAMBI, 01 SEPTEMBER 2006HORMAT KAMI, DISETUJUI OLEH
G I O K PAK HALIM
PERINCIANANGGARAN BIAYA
INSTALASI LISTRIKDI KOTA BARU JAMBI
HARGA TOTAL
120,000 RP. 1,560,000
120,000 RP. 1,320,000
175,000 RP. 175,000
375,000 RP. 375,000
RP. 3,430,000
DISETUJUI OLEH
PAK HALIM
PERINCIANANGGARAN BIAYA
INSTALASI LISTRIKBESERTA BAHAN KABEL PANEL MCB
DI KANTOR PAK MARJUKI
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI BOX PANEL 1 BUAH RP.
2 INSTALASI MCB HAGER 7 BUAH RP.
3 INSTALASI PIYOS BAR 2 BUAH RP.
4 INSTALASI KABEL INDUK 5 M RP.
5 INSTALASI KABEL AC 3 TITIK RP.
6 INSTALASI KABEL LAMPU 3 TITIK RP.
TOTAL
JAMBI, 11 NOVEMBER 2006HORMAT KAMI, DISETUJUI OLEH
G I O K PAK MARJUKI
PERINCIANANGGARAN BIAYA
INSTALASI LISTRIKBESERTA BAHAN KABEL PANEL MCB
DI KANTOR PAK MARJUKI
HARGA TOTAL
150,000 RP. 150,000
60,000 RP. 420,000
50,000 RP. 100,000
30,000 RP. 150,000
300,000 RP. 900,000
300,000 RP. 900,000
RP. 2,620,000
DISETUJUI OLEH
PAK MARJUKI
PERINCIANANGGARAN BIAYA SATUAN
INSTALASI LISTRIK DAN UPAH KERJA
KANTOR KANWIL DITJEN PAJAK JAMBI
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 PASANG KABEL 4X120 MM2 1 METER RP. 100,000
2 PASANG KABEL 4X70 MM2 1 METER RP. 70,000
3 PASANG KABEL 4X50 MM2 1 METER RP. 50,000
4 PASANG KABEL 4X35 MM2 1 METER RP. 35,000
5 PASANG KABEL 4X25 MM2 1 METER RP. 25,000
6 PASANG KABEL 4X16 MM2 1 METER RP. 20,000
7 PASANG KABEL 4X10 MM2 1 METER RP. 20,000
8 PASANG KABEL 4X6 MM2 1 METER RP. 15,000
9 PASANG KABEL 4X4 MM2 1 METER RP. 15,000
10 PASANG KABEL 3X4 MM2 1 METER RP. 15,000
11 PASANG KABEL 3X2,5 MM2 1 METER RP. 15,000
12 PASANG PANEL INDUK 100X150 MM2 1 SET RP. 3,500,000
13 PASANG SOF 4X60 MM2 1 SET RP. 1,000,000
14 PASANG GROUND PENANGKAL PETIR 1 TITIK RP. 1,500,000
15 PASANG JARUM RADAR PETIR/BC 1 TITIK RP. 1,500,000
16 PASANG GROUND PANEL SOF 1 TITIK RP. 500,000
17 INSTALASI LAMPU JALAN 1 TITIK RP. 500,000
18 INSTALASI LAMPU TAMAN 1 TITIK RP. 200,000
19 INSTALASI LAMPU RUANGAN 1 TITIK RP. 35,000
20 INSTALASI STOP KONTAK 1 TITIK RP. 35,000
21 INSTALASI KABEL AC 1 TITIK RP. 250,000
22 INSTALASI TELEPON PABX 1 TITIK RP. 200,000
23 INSTALASI PIPA DI BALOK COR 1 TITIK RP. 15,000
24 INSTALASI BOX MCB 1 TITIK RP. 200,000
JAMBI, 15 NOVEMBER 2006HORMAT KAMI, DISETUJUI OLEH
SUGIYONO PAK SUSENO
PERINCIANANGGARAN BIAYA
PEMASANGAN (INSTALASI) LISTRIK DAN JASA KERJAPASAR BARU JAMBI
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI BARU LAMPU 18 TITIK RP.
2 INSTALASI BARU STOP KONTAK 4 TITIK RP.
3 BONGKAR PASANG PANEL BOX MCB 1 SET RP.
4 PASANG KABEL BAGI GROF AC-LAMPU 9 TITIK RP.
5 PASANG BOX MCB WARHIT 1 SET RP.
6 INSTALASI KABEL INDUK 4X6 12 METER RP.
7 PASANG PIPA AUDIO/TV 2 TITIK RP.
8 PASANG LAMPU PENERANGAN 15 TITIK RP.
9 PASANG STOP KONTAK 4 TITIK RP.
10 PERBAIKAN SAKLAR 10 TITIK RP.
TOTAL PEKERJAAN
PINJAMAN
JUMLAH SISA
JAMBI, 23 JANUARI 2007HORMAT KAMI, TTD
SUGIYONO RIKI
PERINCIANANGGARAN BIAYA
PEMASANGAN (INSTALASI) LISTRIK DAN JASA KERJAPASAR BARU JAMBI
HARGA TOTAL
35,000 RP. 630,000
35,000 RP. 140,000
1,000,000 RP. 1,000,000
75,000 RP. 675,000
150,000 RP. 150,000
25,000 RP. 300,000
25,000 RP. 50,000
15,000 RP. 225,000
15,000 RP. 60,000
15,000 RP. 150,000
TOTAL PEKERJAAN RP. 3,380,000
PINJAMAN RP. 1,000,000
JUMLAH SISA RP. 2,380,000
TTD
RIKI
PERINCIANANGGARAN BIAYA
PENAMBAHAN DAYA DI KANTOR BUANA PINANCEKCABANG JAMBI, JL. HAYAM WURUK
NO JENIS INSTALASI/PEMASANGAN HARGA
TAMBAH DAYA DARI 2200 KE 16500 VA
1 SETOR BP RP.
2 SETOR UJL RP.
3 JASA GAMBAR RP.
4 JASA KERJA RP.
5 KABEL S.R 4 X 16 RP.
TOTAL PEKERJAAN
JAMBI, 26 MARET 2007HORMAT KAMI, DISETUJUI OLEH
SUGIYONO PAK RUDIPIMPINAN
BUANA PINANCEK
PERINCIANANGGARAN BIAYA
PENAMBAHAN DAYA DI KANTOR BUANA PINANCEKCABANG JAMBI, JL. HAYAM WURUK
HARGA
TAMBAH DAYA DARI 2200 KE 16500 VA
6,500,000
3,950,000
1,500,000
1,000,000
1,500,000
14,450,000
DISETUJUI OLEH
PAK RUDIPIMPINAN
BUANA PINANCEK
PERINCIAN
ANGGARAN BIAYA
PEMASANGAN INSTALASI LISTRIK
BESERTA BAHAN SAKLAR PUTIH
DI BANGUNAN RUKO KOTA BARU
JENIS INSTALASI PEMASANGAN
Instalasi Lampu Donlet 4 Titik 95,000 380,000
Instalasi Lampu TL.RM 1 95,000 95,000
Instalasi Lampu Piteng 28 95,000 2,660,000
Instalasi Stop Kontak 10 95,000 950,000
Instalasi Lobang Lampu 5 10,000 50,000
Instalasi Box MCB 6 150,000 900,000
Instalasi Kabel i.B. 3x4 6 30,000 180,000
Instalasi Kabel Arde 3 50,000 150,000
Jumlah 5,365,000
Jambi, 05 April 2007Hormat kami
G I O K
PERINCIANANGGARAN BIAYA
PEMASANGAN (INSTALASI) PANEL LISTRIKPENGGANTIAN DAN PEMBAGIAN DAYA DI LT. II
KANTOR PELAYANAN PAJAK
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI BOX PANEL 1 PCS RP.
2 INSTALASI MCB 3 POL 1 PCS RP.
3 INSTALASI MCB 1 POL 29 PCS RP.
4 INSTALASI REL MCB 3 PCS RP.
5 INSTALASI SISCR MCB 3 PCS RP.
6 INSTALASI PLAT KOPR. NOL 2 PCS RP.
7 INSTALASI PLAT ELEM 3 PCS RP.
8 INSTALASI AMP. METER 3 PCS RP.
9 INSTALASI CT. AMP METER 3 PCS RP.
10 INSTALASI WERENG KABEL PANEL 20 PCS RP.
11 INSTALASI DAK KABEL 2 PCS RP.
12 INSTALASI KABEL TIS 2 PCS RP.
13 JASA KERJA PASANG PANEL 1 SET RP.
TOTAL PEKERJAAN
JAMBI, 15 APRIL 2007HORMAT KAMI, DIKETAHUI
SUGIYONO
PERINCIANANGGARAN BIAYA
PEMASANGAN (INSTALASI) PANEL LISTRIKPENGGANTIAN DAN PEMBAGIAN DAYA DI LT. II
KANTOR PELAYANAN PAJAK
HARGA TOTAL
500,000 RP. 500,000
400,000 RP. 400,000
55,000 RP. 1,595,000
75,000 RP. 225,000
75,000 RP. 225,000
150,000 RP. 300,000
50,000 RP. 150,000
150,000 RP. 450,000
150,000 RP. 450,000
5,000 RP. 100,000
250,000 RP. 500,000
75,000 RP. 150,000
1,750,000 RP. 1,750,000
TOTAL PEKERJAAN RP. 6,795,000
DIKETAHUI
PERINCIANANGGARAN BIAYA
PEMASANGAN (INSTALASI) KABELPENGGANTIAN DAN PEMBAGIAN DAYA DI LT. II
KANTOR PELAYANAN PAJAK
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI KABEL NYY 4 x 16 25 METER RP.
2 INSTALASI KABEL GROUND 1 x 16 25 METER RP.
3 INSTALASI KABEL MWM 3 x 4 50 METER RP.
4 INSTALASI KABEL MWM 3 x 2,5 100 METER RP.
5 JASA PASANG KABEL 4 x 16 25 METER RP.
6 JASA PASANG KABEL 3 x 4 + 3 x 2,5 150 METER RP.
TOTAL PEKERJAAN
JAMBI, 1 MEI 2007HORMAT KAMI, DIKETAHUI
SUGIYONO
PERINCIANANGGARAN BIAYA
PEMASANGAN (INSTALASI) KABELPENGGANTIAN DAN PEMBAGIAN DAYA DI LT. II
KANTOR PELAYANAN PAJAK
HARGA TOTAL
100,000 RP. 2,500,000
25,000 RP. 625,000
15,000 RP. 750,000
12,500 RP. 1,250,000
20,000 RP. 500,000
10,000 RP. 1,500,000
TOTAL PEKERJAAN RP. 7,125,000
DIKETAHUI
PERINCIANANGGARAN BIAYA
PEMASANGAN (INSTALASI) LISTRIK DAN JASA KERJARUMAH ASENG
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI BARU LAMPU 23 TITIK RP.
2 INSTALASI EXHAUST FAN 2 TITIK RP.
3 INSTALASI KABEL AC 1 TITIK RP.
4 INSTALASI ANTENNA TV 1 TITIK RP.
5 INSTALASI STOP KONTAK 5 TITIK RP.
6 INSTALASI STOP GROUND 1 TITIK RP.
7 PERBAIKAN SAKLAR WC 1 TITIK RP.
TOTAL PEKERJAAN
JAMBI, 19 MEI 2007HORMAT KAMI, TTD
SUGIYONO RIKI
PERINCIANANGGARAN BIAYA
PEMASANGAN (INSTALASI) LISTRIK DAN JASA KERJARUMAH ASENG
HARGA TOTAL
35,000 RP. 805,000
75,000 RP. 150,000
150,000 RP. 150,000
75,000 RP. 75,000
35,000 RP. 175,000
75,000 RP. 75,000
35,000 RP. 35,000
TOTAL PEKERJAAN RP. 1,465,000
TTD
RIKI
PERINCIANANGGARAN BIAYA
PEMASANGAN (INSTALASI) LISTRIK DAN JASA KERJARUMAH ACAI
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI BARU LAMPU 23 TITIK RP.
2 INSTALASI EXHAUST FAN 1 TITIK RP.
3 PERBAIKAN LAMPU 3 TITIK RP.
4 PERBAIKAN STOP KONTAK 1 TITIK RP.
TOTAL PEKERJAAN
JAMBI, 19 MEI 2007HORMAT KAMI, TTD
SUGIYONO RIKI
PERINCIANANGGARAN BIAYA
PEMASANGAN (INSTALASI) LISTRIK DAN JASA KERJARUMAH ACAI
HARGA TOTAL
35,000 RP. 805,000
75,000 RP. 75,000
15,000 RP. 45,000
15,000 RP. 15,000
TOTAL PEKERJAAN RP. 940,000
TTD
RIKI
PERINCIANANGGARAN BIAYA
PEMASANGAN (INSTALASI) LISTRIK DAN JASA KERJAKANTOR
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI BARU LAMPU 12 TITIK RP.
2 INSTALASI STOP KONTAK 3 TITIK RP.
3 PERBAIKAN BOX MCB 2 TITIK RP.
4 INSTALASI KABEL ANTENNA 2 TITIK RP.
TOTAL PEKERJAAN
JAMBI, 19 MEI 2007HORMAT KAMI, TTD
SUGIYONO RIKI
PERINCIANANGGARAN BIAYA
PEMASANGAN (INSTALASI) LISTRIK DAN JASA KERJAKANTOR
HARGA TOTAL
35,000 RP. 420,000
35,000 RP. 105,000
50,000 RP. 100,000
75,000 RP. 150,000
TOTAL PEKERJAAN RP. 775,000
TTD
RIKI
PERINCIANANGGARAN BIAYA
PEMASANGAN (INSTALASI) PANEL INDUKPENGGANTIAN DAN PEMBAGIAN DAYA LISTRIK
DI LT. I KANTOR PELAYANAN PAJAK
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI BOX PANEL 1 PCS RP.
2 INSTALASI MCB 1 POL 39 PCS RP.
3 INSTALASI REL MCB 3 PCS RP.
4 INSTALASI SISCR MCB 3 PCS RP.
5 INSTALASI PLAT KOPR. NOL 5 PCS RP.
6 INSTALASI PLAT LEM 3 PCS RP.
7 INSTALASI AMP. METER 6 PCS RP.
8 INSTALASI CT. AMP METER 6 PCS RP.
9 JASA PEMASANGAN PANEL INDUK 1 PCS RP.
TOTAL PEKERJAAN
JAMBI, 07 MEI 2007HORMAT KAMI, DIKETAHUI
SUGIYONO
PERINCIANANGGARAN BIAYA
PEMASANGAN (INSTALASI) PANEL INDUKPENGGANTIAN DAN PEMBAGIAN DAYA LISTRIK
DI LT. I KANTOR PELAYANAN PAJAK
HARGA TOTAL
1,000,000 RP. 1,000,000
55,000 RP. 2,145,000
75,000 RP. 225,000
75,000 RP. 225,000
150,000 RP. 750,000
50,000 RP. 150,000
150,000 RP. 900,000
150,000 RP. 900,000
3,500,000 RP. 3,500,000
TOTAL PEKERJAAN RP. 9,795,000
DIKETAHUI
PERINCIANANGGARAN BIAYA
PEMASANGAN (INSTALASI) KABEL AC DI LT. IPENGGANTIAN KABEL DAN PEMBAGIAN DAYA
DAN PEMASANGAN DI KANTOR PELAYANAN PAJAK
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI KABEL NYM 3 x 4 100 MTR RP.
2 INSTALASI KABEL NYM 3 x 2.5 150 MTR RP.
3 INSTALASI KABEL NYAF 1 x 50 10 MTR RP.
4 INSTALASI KABEL NYAF 1 x 16 25 MTR RP.
5 INSTALASI SEKUN KABEL 50 C 100 PCS RP.
6 INSTALASI SELONG SEKUN 50 C 100 PCS RP.
7 INSTALASI DAK KABEL 30 x 30 C 2 PCS RP.
8 INSTALASI KABEL TIS 300 C 2 PCS RP.
9 JASA PEMASANGAN KABEL 3 x 4 + 3 x 25 250 MTR RP.
TOTAL PEKERJAAN
JAMBI, 22 MEI 2007HORMAT KAMI, DIKETAHUI
SUGIYONO
PERINCIANANGGARAN BIAYA
PEMASANGAN (INSTALASI) KABEL AC DI LT. IPENGGANTIAN KABEL DAN PEMBAGIAN DAYA
DAN PEMASANGAN DI KANTOR PELAYANAN PAJAK
HARGA TOTAL
15,000 RP. 1,500,000
12,500 RP. 1,875,000
100,000 RP. 1,000,000
20,000 RP. 500,000
5,000 RP. 500,000
2,500 RP. 250,000
250,000 RP. 500,000
75,000 RP. 150,000
10,000 RP. 2,500,000
TOTAL PEKERJAAN RP. 8,775,000
DIKETAHUI
PERINCIANANGGARAN BIAYA
PEMASANGAN (INSTALASI) KABEL PANEL INDUKDISTRIBUSI LISTRIK DI LT. I
DAN JASA PEMASANGAN DI KANTOR PELAYANAN PAJAK
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI NOPIYUS BLXKER 1 PCS RP.
2 INSTALASI KABEL NYY 4 x 50 10 MTR RP.
3 INSTALASI MCB 3 VOLT 6 PCS RP.
4 INSTALASI WERENG PANEL 100 PCS RP.
9 JASA PEMASANGAN KABEL INDUK 4 x 50 10 MTR RP.
TOTAL PEKERJAAN
JAMBI, 14 MEI 2007HORMAT KAMI, DIKETAHUI
SUGIYONO
PERINCIANANGGARAN BIAYA
PEMASANGAN (INSTALASI) KABEL PANEL INDUKDISTRIBUSI LISTRIK DI LT. I
DAN JASA PEMASANGAN DI KANTOR PELAYANAN PAJAK
HARGA TOTAL
1,500,000 RP. 1,500,000
350,000 RP. 3,500,000
400,000 RP. 2,400,000
5,000 RP. 500,000
75,000 RP. 750,000
TOTAL PEKERJAAN RP. 8,650,000
DIKETAHUI
PERINCIANANGGARAN BIAYA
PEMASANGAN, INSTALASI LISTRIK DAN JASA KERJATAMBAHAN DAN PERBAIKAN RUMAH ASENG
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI BARU LAMPU 14 TITIK RP.
2 INSTALASI EXHAUST FAN 1 TITIK RP.
3 PERBAIKAN SAKLAT 6 TITIK RP.
4 PERBAIKAN OM SAKLAR 1 TITIK RP.
5 PERBAIKAN STOP KONTAK 4 TITIK RP.
TOTAL PEKERJAAN
JAMBI, 23 JUNI 2007HORMAT KAMI, DIKETAHUI
SUGIYONO R I K I
PERINCIANANGGARAN BIAYA
PEMASANGAN, INSTALASI LISTRIK DAN JASA KERJATAMBAHAN DAN PERBAIKAN RUMAH ASENG
HARGA TOTAL
30,000 RP. 420,000
50,000 RP. 50,000
15,000 RP. 90,000
250,000 RP. 250,000
15,000 RP. 60,000
TOTAL PEKERJAAN RP. 870,000
DIKETAHUI
R I K I
PERINCIANANGGARAN BIAYA SATUAN
PEMASANGAN, INSTALASI LISTRIK DAN JASA KERJA
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI LAMPU 1 TITIK RP.
2 INSTALASI STOP KONTAK 1 TITIK RP.
3 INSTALASI KABEL AC 1 TITIK RP.
4 INSTALASI KABEL 4x6 1 METER RP.
5 INSTALASI KABEL TV 1 TITIK RP.
6 INSTALASI KABEL TELEPON 1 TITIK RP.
7 INSTALASI KABEL PARABOLA 1 TITIK RP.
8 INSTALASI BOX PANEL 1 TITIK RP.
9 INSTALASI OM SAKLAR 1 TITIK RP.
10 PASANG LAMPU 1 TITIK RP.
JAMBI, 28 JUNI 2007HORMAT KAMI, DIKETAHUI
SUGIYONO A N T O N I
PERINCIANANGGARAN BIAYA SATUAN
PEMASANGAN, INSTALASI LISTRIK DAN JASA KERJA
HARGA TOTAL
35,000 RP. 35,000
35,000 RP. 35,000
17,500 RP. 17,500
20,000 RP. 20,000
100,000 RP. 100,000
100,000 RP. 100,000
100,000 RP. 100,000
500,000 RP. 500,000
500,000 RP. 500,000
5,000 RP. 5,000
DIKETAHUI
A N T O N I
PERINCIAN PEMASANGAN PENANGKIS PETIR BESERTA ARDE ENTALASI PANEL BESERTA MASA BUMIBESERTA PENGADAAN BAHAN TERSEBUT DI BAWAH INI
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 PEMASANGAN PENANGKIS PETIR 1 SET RP.
2 PEMASANGAN MASA BUMI 1 SET RP.
3 PEMASANGAN ARDE PANEL 1 SET RP.
TOTAL PEKERJAAN
Demikianlah penawaran ini kami tersebut di atas.
HORMAT KAMI
SOGIYONO/GIYO
PERINCIAN PEMASANGAN PENANGKIS PETIR BESERTA ARDE ENTALASI PANEL BESERTA MASA BUMIBESERTA PENGADAAN BAHAN TERSEBUT DI BAWAH INI
HARGA TOTAL
5,000,000 RP. 5,000,000
1,500,000 RP. 1,500,000
1,500,000 RP. 1,500,000
TOTAL PEKERJAAN RP. 8,000,000
HORMAT KAMI
SOGIYONO/GIYO
PERINCIANANGGARAN BIAYA PEMASANGAN INSTALASI LISTRIK
DI RUKO BARU SIMPANG PULE
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI BOX MCB 3 SET RP.
2 INSTALASI LAMPU 22 TITIK RP.
3 INSTALASI SETOP KONTAK 9 TITIK RP.
4 INSTALASI KABEL IB KAWH 3 METER RP.
5 INSTALASI KABEL GRON 1 TITIK RP.
TOTAL PEKERJAAN
JAMBI, 28 JUNI 2007HORMAT KAMI, DIKETAHUI
SUGIYONO H A L I M
PERINCIANANGGARAN BIAYA PEMASANGAN INSTALASI LISTRIK
DI RUKO BARU SIMPANG PULE
HARGA TOTAL
150,000 RP. 450,000
85,000 RP. 1,870,000
85,000 RP. 765,000
30,000 RP. 90,000
50,000 RP. 50,000
TOTAL PEKERJAAN RP. 3,225,000
DIKETAHUI
H A L I M
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASAAPOTEK WTC LANTAI I
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI LAMPU 55 TITIK RP. 35,000
2 INSTALASI STOP KONTAK 25 TITIK RP. 35,000
3 INSTALASI KABEL AC 4 TITIK RP. 175,000
4 INSTALASI KABEL INDUK 4 X 6 KWH 25 MTR RP. 20,000
5 INSTALASI KABEL INDUK 4 X 6 GENESET 25 MTR RP. 20,000
6 INSTALASI KABEL ARDE 1 X 10 GENESET 25 MTR RP. 10,000
7 INSTALASI KABEL ARDE 1 X 10 KWH 25 MTR RP. 10,000
8 INSTALASI KABEL DATA KOMPUTER 5 TITIK RP. 100,000
9 INSTALASI KABEL DATA KAMERA CCTV 3 TITIK RP. 100,000
10 INSTALASI KABEL INDOK TELEPON 3 TITIK RP. 100,000
11 INSTALASI KABEL TELEPON PABX 6 TITIK RP. 100,000
12 INSTALASI KABEL ALARM 2 TITIK RP. 100,000
13 INSTALASI KABEL AUDIO 2 TITIK RP. 100,000
14 INSTALASI KABEL MEREK/ REKLAME 2 TITIK RP. 250,000
15 INSTALASI STOP KONTAK CCTV 3 TITIK RP. 100,000
16 INSTALASI STOP KONTAK KABEL TV 2 TITIK RP. 100,000
17 INSTALASI BOX PANEL INDUK 1 SET RP. 500,000
18 INSTALASI BOX OM.SAKELAR 1 SET RP. 500,000
19 INSTALASI BOX PANEL GENESET 1 SET RP. 500,000
20 INSTALASI PASANG LAMPU DONLET 55 TITIK RP. 5,000
21 PASANG BOR ARDE PANEL KWH 1 SET RP. 1,500,000
22 PASANG BOR HPR PANEL 1 SET RP. 2,000,000
JUMLAH
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASAAPOTEK WTC LANTAI II
PANEL PENERANGAN LP-B-RG BILAS
1 INSTALASI LAMPU 20 TITIK RP. 35,000
2 INSTALASI STOP KONTAK 18 TITIK RP. 35,000
3 INSTALASI KABEL AC 2 TITIK RP. 175,000
4 INSTALASI KABEL 4 X 6 KE LT.II 10 MTR RP. 20,000
5 INSTALASI KABEL DATA KOMPUTER 4 TITIK RP. 100,000
6 INSTALASI KABEL DATA KAMERA CCTV 1 TITIK RP. 100,000
7 INSTALASI STOP KONTAK KE KABEL TV 2 TITIK RP. 100,000
8 INSTALASI KABEL ARDE PANEL SOF 10 MTR RP. 10,000
9 INSTALASI KABEL TELEPON PABX 4 TITIK RP. 100,000
10 INSTALASI STOP KONTAK KAMERA CCTV 1 TITIK RP. 100,000
11 INSTALASI BOX PANEL SOF 1 SET RP. 350,000
12 PASANG ESOS PEN 2 TITIK RP. 75,000
13 PASANG LAMPU DONLET 20 TITIK RP. 5,000
JUMLAH
PERINCIANANGGARAN BIAYA TOTAL
PEMASANG INSTALASI LISTRIK DAN JASAAPOTEK WTC
1 INSTALASI LANTAI I
2 INSTALASI LANTAI II
JUMLAH
JAMBI, 16 JANUARI 2008HORMAT KAMI,
SUGIYONO
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASAAPOTEK WTC LANTAI I
TOTAL
RP. 1,925,000
RP. 875,000
RP. 700,000
RP. 500,000
RP. 500,000
RP. 250,000
RP. 250,000
RP. 500,000
RP. 300,000
RP. 300,000
RP. 600,000
RP. 200,000
RP. 200,000
RP. 500,000
RP. 300,000
RP. 200,000
RP. 500,000
RP. 500,000
RP. 500,000
RP. 275,000
RP. 1,500,000
RP. 2,000,000
RP. 13,375,000
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASAAPOTEK WTC LANTAI II
PANEL PENERANGAN LP-B-RG BILAS
RP. 700,000
RP. 630,000
RP. 350,000
RP. 200,000
RP. 400,000
RP. 100,000
RP. 200,000
RP. 100,000
RP. 400,000
RP. 100,000
RP. 350,000
RP. 150,000
RP. 100,000
RP. 3,780,000
PERINCIANANGGARAN BIAYA TOTAL
PEMASANG INSTALASI LISTRIK DAN JASAAPOTEK WTC
RP. 13,375,000
RP. 3,780,000
RP. 17,155,000
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJARUMAH DI WTC LANTAI I
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI LAMPU 13 TITIK RP. 35,000
2 INSTALASI STOP KONTAK 8 TITIK RP. 35,000
3 INSTALASI KABEL KE ON SAKELAR 4 X 6 40 MTR RP. 20,000
4 INSTALASI KABEL KAMERA CCTV 2 TITIK RP. 100,000
5 INSTALASI STOP KONTAK CCTV 2### TITIK RP. 100,000
6 INSTALASI STOP KONTAK KABEL TV 2 TITIK RP. 100,000
7 INSTALASI KABEL DATA KOMPUTER 1 TITIK RP. 100,000
8 INSTALASI KABEL TELEPON 1 TITIK RP. 100,000
9 INSTALASI KABEL IB KWH 4 X 6 5 MTR RP. 20,000
10 INSTALASI KABEL ARDE KWH 1 X 10 5 MTR RP. 10,000
11 INSTALASI KABEL ARDE OM SAKELAR 40 MTR RP. 10,000
12 INSTALASI PASANG LAMPU DONLET 13 TITIK RP. 5,000
13 INSTALASI BOR ARDE PANEL 1 SET RP. 1,500,000
14 INSTALASI BOR HPR PANEL 1 SET RP. 2,000,000
15 INSTALASI GALIAN TIMBUN 1 TITIK RP. 500,000
16 INSTALASI BOX PANEL INDUK 1 SET RP. 500,000
17 INSTALASI KABEL BEL RUMAH 1 TITIK RP. 100,000
18 INSTALASI EXHAUST FAN 1 TITIK RP. 500,000
JUMLAH
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJARUMAH DI WTC LANTAI II
PANEL PENERANGAN LP-B-RG BILAS
1 INSTALASI LAMPU 26 TITIK RP. 35,000
2 INSTALASI STOP KONTAK 15 TITIK RP. 35,000
3 INSTALASI KABEL AC 1 TITIK RP. 175,000
4 INSTALASI KABEL 4 X 6 KE LT.II 20 MTR RP. 20,000
5 INSTALASI KABEL DATA KOMPUTER 2 TITIK RP. 100,000
6 INSTALASI KABEL DATA KAMERA CCTV 2 TITIK RP. 100,000
7 INSTALASI STOP KONTAK KE KABEL TV 2 TITIK RP. 100,000
8 INSTALASI KABEL PARABOLA 2 TITIK RP. 100,000
9 INSTALASI KABEL ANTNE UHF 1 TITIK RP. 100,000
10 INSTALASI KABEL ARDE PANEL 20 MTR RP. 10,000
11 INSTALASI KABEL TELEPON PABX 1 TITIK RP. 100,000
12 INSTALASI STOP KONTAK KAMERA CCTV 1 TITIK RP. 100,000
13 INSTALASI BOX PANEL SOF 1 SET RP. 350,000
14 PASANG EXHAUST FAN 3 TITIK RP. 75,000
15 PASANG KIPAS ANGIN 1 TITIK RP. 75,000
16 PASANG LAMPU DONLET 26 TITIK RP. 5,000
JUMLAH
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJARUMAH DI WTC LANTAI III
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI LAMPU 55 TITIK RP. 35,000
2 INSTALASI STOP KONTAK 25 TITIK RP. 35,000
3 INSTALASI KABEL AC 4 TITIK RP. 175,000
4 INSTALASI KABEL 4x6 KE LT. I 30 MTR RP. 20,000
5 INSTALASI KABEL ARDE 1x10 KE LT. I 30### MTR RP. 10,000
6 INSTALASI KABEL 4x6 KE LT. II 20 MTR RP. 20,000
7 INSTALASI KABEL ARDE 1x10 KE LT. II 20 MTR RP. 10,000
8 INSTALASI KABEL DATA KOMPUTER 4 TITIK RP. 100,000
9 INSTALASI KABEL CAMERA CCTV 2 MTR RP. 100,000
10 INSTALASI STOP KONTAK CCTV 2 MTR RP. 100,000
11 INSTALASI KABEL TELEPON PABX 4 MTR RP. 100,000
12 INSTALASI BOX PANEL SOF 2 SET RP. 350,000
13 INSTALASI PASANG LAMPU DONLET 55 TITIK RP. 5,000
14 INSTALASI STOP KONTAK KABEL TV 8 TITIK RP. 100,000
15 INSTALASI KABEL INDUK TELEPON 3 TITIK RP. 100,000
16 INSTALASI KABEL DATA PARALEL CCTV 1 TITIK RP. 100,000
18 INSTALASI EXHAUST FAN 3 TITIK RP. 75,000
JUMLAH
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJARUMAH DI WTC LANTAI IV
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI LAMPU 12 TITIK RP. 35,000
2 INSTALASI STOP KONTAK 11 TITIK RP. 35,000
3 INSTALASI KABEL SOLAHART 1 TITIK RP. 175,000
4 INSTALASI KABEL ARDE 1x10 20 MTR RP. 10,000
5 INSTALASI KABEL ENSET 4x6 20### MTR RP. 20,000
6 INSTALASI STOP KONTAK TV 1 TITIK RP. 100,000
7 INSTALASI OM SAKLAR 1 SRT RP. 350,000
8 INSTALASI BOX PANEL SOF 1 SRT RP. 350,000
9 INSTALASI BOX PANEL GENSET 1 SRT RP. 500,000
10 INSTALASI KABEL 4x6 PANEL SOF 40 MTR RP. 20,000
11 INSTALASI KABEL 1x10 ARDE PANEL 40 MTR RP. 10,000
18 INSTALASI EXHAUST FAN 1 TITIK RP. 75,000
JUMLAH
PERINCIANANGGARAN BIAYA TOTAL
PEMASANG INSTALASI LISTRIK DAN JASA KERJARUMAH DI WTC LANTAI I-IV
1 INSTALASI LANTAI I
2 INSTALASI LANTAI II
3 INSTALASI LANTAI III
4 INSTALASI LANTAI IV
JUMLAH
JAMBI, 16 JANUARI 2008HORMAT KAMI,
SUGIYONO
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJARUMAH DI WTC LANTAI I
TOTAL
RP. 455,000
RP. 280,000
RP. 800,000
RP. 200,000
RP. 200,000
RP. 200,000
RP. 100,000
RP. 100,000
RP. 100,000
RP. 50,000
RP. 400,000
RP. 65,000
RP. 1,500,000
RP. 2,000,000
RP. 500,000
RP. 500,000
RP. 100,000
RP. 500,000
RP. 8,050,000
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJARUMAH DI WTC LANTAI II
PANEL PENERANGAN LP-B-RG BILAS
RP. 910,000
RP. 525,000
RP. 175,000
RP. 400,000
RP. 200,000
RP. 200,000
RP. 200,000
RP. 200,000
RP. 100,000
RP. 200,000
RP. 100,000
RP. 100,000
RP. 350,000
RP. 225,000
RP. 75,000
RP. 130,000
RP. 4,090,000
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJARUMAH DI WTC LANTAI III
TOTAL
RP. 1,925,000
RP. 875,000
RP. 700,000
RP. 600,000
RP. 300,000
RP. 400,000
RP. 200,000
RP. 400,000
RP. 200,000
RP. 200,000
RP. 400,000
RP. 700,000
RP. 275,000
RP. 800,000
RP. 300,000
RP. 100,000
RP. 225,000
RP. 8,600,000
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJARUMAH DI WTC LANTAI IV
TOTAL
RP. 420,000
RP. 385,000
RP. 175,000
RP. 200,000
RP. 400,000
RP. 100,000
RP. 350,000
RP. 350,000
RP. 500,000
RP. 800,000
RP. 400,000
RP. 75,000
RP. 4,155,000
PERINCIANANGGARAN BIAYA TOTAL
PEMASANG INSTALASI LISTRIK DAN JASA KERJARUMAH DI WTC LANTAI I-IV
RP. 8,050,000
RP. 4,090,000
RP. 8,600,000
RP. 4,155,000
RP. 24,895,000
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJAAPOTIK SIPIN LANTAI I
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI LAMPU 61 TITIK RP. 35,000
2 INSTALASI STOP KONTAK 34 TITIK RP. 35,000
3 INSTALASI KABEL AC 3 TITIK RP. 175,000
4 INSTALASI KABEL REKLAME 2 TITIK RP. 25,000
5 INSTALASI KABEL INDUK 4x6 30 MTR RP. 20,000
6 INSTALASI KABEL TV 1### TITIK RP. 100,000
7 INSTALASI KABEL TELEPON INDUK 4 TITIK RP. 100,000
8 INSTALASI KABEL TELEPON 6 TITIK RP. 100,000
9 INSTALASI KABEL PARABOLA 1 TITIK RP. 100,000
10 INSTALASI KABEL DATA KOMPUTER 6 SET RP. 100,000
11 INSTALASI KABEL DATA CCTV 3 SET RP. 100,000
12 INSTALASI STOP KONTAK CCTV 3 MTR RP. 100,000
13 INSTALASI KABEL AUDIO 2 TITIK RP. 100,000
14 INSTALASI KABEL ALARM 1 TITIK RP. 100,000
15 INSTALASI KABEL ARDE PANEL 1x10 45 MTR RP. 10,000
16 INSTALASI BOX PANEL INDUK 1 SET RP. 500,000
17 INSTALASI OM SAKELAR 1 SET RP. 500,000
18 INSTALASI BOX PANEL GENSET 1 SET RP. 500,000
19 INSTALASI BOX ARDE 1 SET RP. 1,500,000
20 PASANG LAMPU DONLET 61 TITIK RP. 5,000
21 PASANG KABEL GENSET 4x6 15 MTR RP. 20,000
22 PASANG HPR 1 SET RP. 1,500,000
JUMLAH
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJARUMAH DI WTC LANTAI II
PANEL PENERANGAN LP-B-RG BILAS
1 INSTALASI LAMPU 26 TITIK RP. 35,000
2 INSTALASI STOP KONTAK 15 TITIK RP. 35,000
3 INSTALASI KABEL AC 1 TITIK RP. 175,000
4 INSTALASI KABEL 4 X 6 KE LT.II 20 MTR RP. 20,000
5 INSTALASI KABEL DATA KOMPUTER 2 TITIK RP. 100,000
6 INSTALASI KABEL DATA KAMERA CCTV 2 TITIK RP. 100,000
7 INSTALASI STOP KONTAK KE KABEL TV 2 TITIK RP. 100,000
8 INSTALASI KABEL PARABOLA 2 TITIK RP. 100,000
9 INSTALASI KABEL ANTNE UHF 1 TITIK RP. 100,000
10 INSTALASI KABEL ARDE PANEL 20 MTR RP. 10,000
11 INSTALASI KABEL TELEPON PABX 1 TITIK RP. 100,000
12 INSTALASI STOP KONTAK KAMERA CCTV 1 TITIK RP. 100,000
13 INSTALASI BOX PANEL SOF 1 SET RP. 350,000
14 PASANG EXHAUST FAN 3 TITIK RP. 75,000
15 PASANG KIPAS ANGIN 1 TITIK RP. 75,000
16 PASANG LAMPU DONLET 26 TITIK RP. 5,000
JUMLAH
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJARUMAH DI WTC LANTAI III
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI LAMPU 55 TITIK RP. 35,000
2 INSTALASI STOP KONTAK 25 TITIK RP. 35,000
3 INSTALASI KABEL AC 4 TITIK RP. 175,000
4 INSTALASI KABEL 4x6 KE LT. I 30 MTR RP. 20,000
5 INSTALASI KABEL ARDE 1x10 KE LT. I 30### MTR RP. 10,000
6 INSTALASI KABEL 4x6 KE LT. II 20 MTR RP. 20,000
7 INSTALASI KABEL ARDE 1x10 KE LT. II 20 MTR RP. 10,000
8 INSTALASI KABEL DATA KOMPUTER 4 TITIK RP. 100,000
9 INSTALASI KABEL CAMERA CCTV 2 MTR RP. 100,000
10 INSTALASI STOP KONTAK CCTV 2 MTR RP. 100,000
11 INSTALASI KABEL TELEPON PABX 4 MTR RP. 100,000
12 INSTALASI BOX PANEL SOF 2 SET RP. 350,000
13 INSTALASI PASANG LAMPU DONLET 55 TITIK RP. 5,000
14 INSTALASI STOP KONTAK KABEL TV 8 TITIK RP. 100,000
15 INSTALASI KABEL INDUK TELEPON 3 TITIK RP. 100,000
16 INSTALASI KABEL DATA PARALEL CCTV 1 TITIK RP. 100,000
18 INSTALASI EXHAUST FAN 3 TITIK RP. 75,000
JUMLAH
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJARUMAH DI WTC LANTAI IV
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI LAMPU 12 TITIK RP. 35,000
2 INSTALASI STOP KONTAK 11 TITIK RP. 35,000
3 INSTALASI KABEL SOLAHART 1 TITIK RP. 175,000
4 INSTALASI KABEL ARDE 1x10 20 MTR RP. 10,000
5 INSTALASI KABEL ENSET 4x6 20### MTR RP. 20,000
6 INSTALASI STOP KONTAK TV 1 TITIK RP. 100,000
7 INSTALASI OM SAKLAR 1 SRT RP. 350,000
8 INSTALASI BOX PANEL SOF 1 SRT RP. 350,000
9 INSTALASI BOX PANEL GENSET 1 SRT RP. 500,000
10 INSTALASI KABEL 4x6 PANEL SOF 40 MTR RP. 20,000
11 INSTALASI KABEL 1x10 ARDE PANEL 40 MTR RP. 10,000
18 INSTALASI EXHAUST FAN 1 TITIK RP. 75,000
JUMLAH
PERINCIANANGGARAN BIAYA TOTAL
PEMASANG INSTALASI LISTRIK DAN JASA KERJAAPOTIK SIPIN
1 TOTAL A LANTAI I
2 TOTAL B LANTAI II
3 TOTAL C LANTAI III
JUMLAH
JAMBI, 04 OKTOBER 2007HORMAT KAMI,
SUGIYONO
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJAAPOTIK SIPIN LANTAI I
TOTAL
RP. 2,135,000
RP. 1,190,000
RP. 525,000
RP. 50,000
RP. 600,000
RP. 100,000
RP. 400,000
RP. 600,000
RP. 100,000
RP. 600,000
RP. 300,000
RP. 300,000
RP. 200,000
RP. 100,000
RP. 450,000
RP. 500,000
RP. 500,000
RP. 500,000
RP. 1,500,000
RP. 305,000
RP. 300,000
RP. 1,500,000
RP. 12,755,000
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJARUMAH DI WTC LANTAI II
PANEL PENERANGAN LP-B-RG BILAS
RP. 910,000
RP. 525,000
RP. 175,000
RP. 400,000
RP. 200,000
RP. 200,000
RP. 200,000
RP. 200,000
RP. 100,000
RP. 200,000
RP. 100,000
RP. 100,000
RP. 350,000
RP. 225,000
RP. 75,000
RP. 130,000
RP. 4,090,000
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJARUMAH DI WTC LANTAI III
TOTAL
RP. 1,925,000
RP. 875,000
RP. 700,000
RP. 600,000
RP. 300,000
RP. 400,000
RP. 200,000
RP. 400,000
RP. 200,000
RP. 200,000
RP. 400,000
RP. 700,000
RP. 275,000
RP. 800,000
RP. 300,000
RP. 100,000
RP. 225,000
RP. 8,600,000
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK DAN JASA KERJARUMAH DI WTC LANTAI IV
TOTAL
RP. 420,000
RP. 385,000
RP. 175,000
RP. 200,000
RP. 400,000
RP. 100,000
RP. 350,000
RP. 350,000
RP. 500,000
RP. 800,000
RP. 400,000
RP. 75,000
RP. 4,155,000
PERINCIANANGGARAN BIAYA TOTAL
PEMASANG INSTALASI LISTRIK DAN JASA KERJAAPOTIK SIPIN
RP. 12,755,000
RP. 4,415,000
RP. 3,760,000
RP. 20,930,000
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK BESERTA BAHAN SAKLAR PUTIHDI BANGUNAN RUKO SIMPANG RIMBO
NO JENIS INSTALASI/PEMASANGAN JUMLAH HARGA
1 INSTALASI LAMPU 60 TITIK RP. 90,000
2 INSTALASI STOP KONTAK 24 TITIK RP. 90,000
3 INSTALASI KABEL 1 B 3 X 4 20 METER RP. 20,000
4 INSTALASI BOX MCB 8 SET RP. 150,000
JUMLAH
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK BESERTA BAHAN SAKLAR PUTIHDI BANGUNAN KEBUN HANDIL
PANEL PENERANGAN LP-B-RG BILAS
1 INSTALASI LAMPU 36 TITIK RP. 90,000
2 INSTALASI STOP KONTAK 16 TITIK RP. 90,000
3 INSTALASI KABEL 1 B 3 X 4 25 METER RP. 20,000
4 INSTALASI BOX MCB 4 SET RP. 150,000
JUMLAH
JAMBI, 01 MARET 2008
HORMAT KAMI,
G I O K
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK BESERTA BAHAN SAKLAR PUTIHDI BANGUNAN RUKO SIMPANG RIMBO
TOTAL
RP. 5,400,000
RP. 2,160,000
RP. 400,000
RP. 1,200,000
RP. 9,160,000
PERINCIANANGGARAN BIAYA SATUAN
PEMASANG INSTALASI LISTRIK BESERTA BAHAN SAKLAR PUTIHDI BANGUNAN KEBUN HANDIL
PANEL PENERANGAN LP-B-RG BILAS
RP. 3,240,000
RP. 1,440,000
RP. 500,000
RP. 600,000
RP. 5,780,000