55144175 r a b gudang pln pkn baru

Post on 02-Feb-2016

242 Views

Category:

Documents

3 Downloads

Preview:

Click to see full reader

DESCRIPTION

gudang

TRANSCRIPT

RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN :

LOKASI :

NO URAIAN PEKERJAAN SAT VOLUMEHARGA SATUAN

(Rp)

I. PEK. PEDAHULUAN1 Pembersihan Lokasi Ls 1.00 2,500,000.002 Direksi keet Ls 1.00 8,000,000.003 Pembuatan Pagar Proyek 90.00 180,000.004 Pas.Bowplank/Pengukuran 78.00 42,000.00

Jumlah III. PEKERJAAN PONDASI/SLOOF

1 Galian Tanah Pondasi Plat 19.20 37,500.002 Pondasi Beton Poor 0.25/1.00/1.00 4.00 2,890,000.003 Beton Sloof 20/40 8.00 4,760,000.004 Beto Kolom 30/30 7.34 5,230,000.005 Beto Balok Latei 15/20 1.50 4,610,000.006 Beto Ring Balok 20/30 3.00 5,730,000.00

Jumlah IIIII. PEKERJAAN KAP/ATAP

1 Pas.Kuda-kuda Rangka Atap 10.20 4,475,000.002 Pas Atap Seng BJLS 0,30 281.60 110,000.003 Pas.Perabung Seng BJLS 0,30 16.80 60,000.00

Jumlah IIIIV. PEKERJAAN DINDING/PLESTERAN

1 Pas.Batu Bata 1:4 260.00 92,000.003 Plesteran 1:4 520.00 34,000.004 Afwerkink Beton 57.60 42,000.00

Jumlah IVV. PEKERJAAN LANTAI

1 Urugan Bawah Lantai 75.00 156,000.002 Beton Bertulang Lantai 19.26 2,600,000.00

Jumlah VVI. PEKERJAAN KONSEN PINTU DAN JENDELA

1 Pas.Pintu Folding Gate 9.00 900,000.002 Pas.Pintu Angin Besi Holow 4.00 670,000.00 3 Pas.Loster Beton Unit 24.00 85,000.00

Jumlah VIVII. PEKERJAAN CAT

1 Cat.Dinding Dan Plafond 577.60 28,000.00

VIIVIII. PEKERJAAN MEKANIKAL/ELEKTRIKAL

1 Pas.Stop Kontak Bh 4.00 225,000.002 Pas.Lampu TL Kap 2x40 Bh 4.00 235,000.003 Pas.Instalasi Lampu Titik 8.00 195,000.00

Jumlah VIII

REKAPITULASI

I. PEK. PEDAHULUANII. PEKERJAAN PONDASI/SLOOFIII. PEKERJAAN KAP/ATAPIV. PEKERJAAN DINDING/PLESTERANV. PEKERJAAN LANTAIVI. PEKERJAAN KONSEN PINTU DAN JENDELAVII. PEKERJAAN CATVIII. PEKERJAAN MEKANIKAL/ELEKTRIKAL

Terbilang: Tiga Ratus Sembilan Puluh Tiga- Sub Total Juta Tujuh Ratus Tiga Ribu Rupiah PPN 10%

M1

M1

M3

M3

M3

M3

M3

M3

M3

M2

M1

M2

M2

M2

M3

M3

M2

M2

M2

NO URAIAN PEKERJAAN SAT VOLUMEHARGA SATUAN

(Rp)Jumlah TotalDibulatkan

RENCANA ANGGARAN BIAYA (RAB)

JUMLAH HARGA(Rp)

2,500,000.00 8,000,000.00 16,200,000.00 3,276,000.00 29,976,000.00

720,000.00 11,560,000.00 38,080,000.00 38,409,120.00 6,915,000.00 17,190,000.00 112,154,120.00

45,645,000.00 30,976,000.00 1,008,000.00 77,629,000.00

23,920,000.00 17,680,000.00 2,419,200.00 44,019,200.00

11,700,000.00 50,065,600.00 61,765,600.00

8,100,000.00 2,680,000.00 2,040,000.00 12,820,000.00

16,172,800.00

16,172,800.00

900,000.00 940,000.00 1,560,000.00 3,400,000.00

29,976,000.00112,154,120.00

77,629,000.0044,019,200.0061,765,600.0012,820,000.0016,172,800.00

3,400,000.00

357,936,720.0035,793,672.00

JUMLAH HARGA(Rp)

393,730,392.00393,730,000.00

RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBUATAN GUDANG

LOKASI : PT PLN (PERSERO) WILAYAH RIAU

NO URAIAN PEKERJAAN SAT VOLUMEHARGA SATUAN JUMLAH HARGA

(Rp) (Rp)

I. PEK. PEDAHULUAN1 Pembersihan Lokasi Ls 1.00 750,000.00 750,000.00 2 Pembuatan Pagar Proyek/Pengukuran 62.00 282,551.00 17,518,162.00

Jumlah I 18,268,162.00 II. PEKERJAAN PONDASI/SLOOF

1 Galian Tanah Pondasi Plat 19.20 37,500.00 720,000.00 2 Pondasi Beton Poor 0.25/1.00/1.00 4.00 2,890,000.00 11,560,000.00 3 Beton Sloof 20/40 8.00 4,760,000.00 38,080,000.00 4 Beton Kolom 30/30 7.34 5,230,000.00 38,409,120.00 5 Beton Balok Lantai 15/20 1.50 4,610,000.00 6,915,000.00 6 Beton Ring Balok 20/30 3.00 5,730,000.00 17,190,000.00

Jumlah II 112,154,120.00 III. PEKERJAAN KAP/ATAP

1 Pas.Kuda-kuda Rangka Atap 10.20 4,475,000.00 45,645,000.00 2 Pas Atap Seng BJLS 0,30 281.60 47,200.00 13,291,520.00 3 Pas.Perabung Seng BJLS 0,30 16.80 60,000.00 1,008,000.00

Jumlah III 59,944,520.00 IV. PEKERJAAN DINDING/PLESTERAN

1 Pas.Batu Bata 1:4 260.00 173,258.00 45,047,080.00 3 Plesteran 1:4 520.00 27,154.00 14,120,080.00 4 Acian Beton 57.60 16,400.00 944,640.00

Jumlah IV 60,111,800.00 V. PEKERJAAN LANTAI

1 Urugan Bawah Lantai 75.00 137,150.00 10,286,250.00 2 Beton Bertulang Lantai Teb. 12 cm 18.00 2,600,000.00 46,800,000.00

Jumlah V 57,086,250.00 VI. PEKERJAAN PINTU

1 Pas.Pintu Folding Gate 12.00 950,000.00 11,400,000.00 2 Pas.Pintu Angin Besi Holow 4.00 670,000.00 2,680,000.00

Jumlah VI 14,080,000.00 VII. PEKERJAAN CAT

1 Cat.Dinding 414.00 28,000.00 11,592,000.00 VII 11,592,000.00

VIII. PEKERJAAN MEKANIKAL/ELEKTRIKAL1 Pas.Stop Kontak Bh 4.00 225,000.00 900,000.00 2 Pas.Lampu TL Kap 2x40 Bh 6.00 235,000.00 1,410,000.00 3 Pas.Instalasi Lampu Titik 8.00 195,000.00 1,560,000.00

Jumlah VIII 3,870,000.00

REKAPITULASI

I. PEK. PEDAHULUAN 18,268,162.00II. PEKERJAAN PONDASI/SLOOF 112,154,120.00III. PEKERJAAN KAP/ATAP 59,944,520.00IV. PEKERJAAN DINDING/PLESTERAN 60,111,800.00V. PEKERJAAN LANTAI 57,086,250.00VI. PEKERJAAN PINTU 14,080,000.00VII. PEKERJAAN CAT 11,592,000.00VIII. PEKERJAAN MEKANIKAL/ELEKTRIKAL 3,870,000.00

Terbilang: Tiga Ratus Tujuh Puluh Juta Delapan Sub Total 337,106,852.00 Ratus Tujuh Belas Ribu Rupiah PPN 10% 33,710,685.20

Jumlah Total 370,817,537.20Dibulatkan 370,817,000.00

M1

M3

M3

M3

M3

M3

M3

M3

M2

M1

M2

M2

M2

M3

M3

M2

M2

M2

top related