ahs 2014 - upload ok fix.pdf

542
HARGA HARGA SATUAN No. SATUAN SATUAN PER HARI ( Rp.) ( Rp.) 1. Pekerja Jam 7 jam /hari 2. Pekerja Tak Terlatih Jam 7 jam /hari 3. Tukang Jam 7 jam /hari 4. Kepala Tukang Jam 7 jam /hari 5. M a n d o r Jam 7 jam /hari 6. Operator Jam 7 jam /hari 7. Pembantu Operator Jam 7 jam /hari 8. Sopir / Driver Jam 7 jam /hari 9. Pembantu Sopir / Driver Jam 7 jam /hari 10. Mekanik Jam 7 jam /hari 11. Pembantu Mekanik Jam 7 jam /hari HARGA DASAR SATUAN UPAH JAM KERJA EFFEKTIF U R A I A N

Upload: whaone1176

Post on 03-Feb-2016

248 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: AHS 2014 - upload OK FIX.pdf

HARGA HARGA SATUAN

No. SATUAN SATUAN PER HARI

( Rp.) ( Rp.)

1. Pekerja Jam 7 jam /hari

2. Pekerja Tak Terlatih Jam 7 jam /hari

3. Tukang Jam 7 jam /hari

4. Kepala Tukang Jam 7 jam /hari

5. M a n d o r Jam 7 jam /hari

6. Operator Jam 7 jam /hari

7. Pembantu Operator Jam 7 jam /hari

8. Sopir / Driver Jam 7 jam /hari

9. Pembantu Sopir / Driver Jam 7 jam /hari

10. Mekanik Jam 7 jam /hari

11. Pembantu Mekanik Jam 7 jam /hari

HARGA DASAR SATUAN UPAH

JAM KERJA

EFFEKTIFU R A I A N

Page 2: AHS 2014 - upload OK FIX.pdf

HARGA

No. SATUAN SATUAN

( Rp.)

1 Pasir Pasang m³

2 Pasir Beton (Kasar) m³

3 Pasir Halus (untuk HRS) m³

4 Pasir Urug (ada unsur lempung) m³

5 Pasir Urug m³

6 Batu Kali m³

7 Batu Bata Buah

8 Batu Belah / Kerakal m³

9 S i r t u m³

10 Bahan Tanah Timbunan m³

11 Bahan Pilihan m³

12 Batu Kapur m³

13 Agregat Kasar m³

14 Agregat Halus m³

15 Agregat Pecah Mesin 0-5 mm m³

16 Agregat Pecah Mesin 5-10 & 10-20 mm m³

17 Agregat Pecah Mesin 20-30 mm m³

18 F i l l e r Kg

19 Bahan Agr.Base Kelas A m³

20 Bahan Agr.Base Kelas B m³

21 Bahan Agr.Base Kelas C m³

22 Chipping m³

23 Chipping (kg) m³

24 Semen / PC (50kg) Zak

25 Semen / PC (kg) Kg

26 Semen Berwarna Kg

27 Besi Beton Kg

28 Kawat Beton Kg

29 Kawat Bronjong Kg

30 P a k u Kg

31 Baja Tulangan (Polos) Kg

32 Baja Tulangan (Ulir) Kg

33 Kawat Las Dos

34 Pipa Baja Kg

35 Baja Struktur Kg

36 Baja Bergelombang Kg

37 Kayu Perancah m³

38 Cerucuk Dolken Ø 8 - 10 cm Btg

39 Cerucuk Dolken Ø 10 - 15 cm Btg

40 Bambu Ø Btg

41 Multipleks uk. 122 x 242 x 12 mm Lbr

42 Multipleks uk. 122 x 242 x 9 mm Lbr

HARGA DASAR SATUAN BAHAN

U R A I A N

Page 3: AHS 2014 - upload OK FIX.pdf

HARGA

No. SATUAN SATUAN

( Rp.)

U R A I A N

43 Triplek Lbr

44 Kayu Acuan m³

45 Beton Ready Mix K-125 m³

46 Beton Ready Mix K-175 m³

47 Beton Ready Mix K-225 m³

48 Beton Ready Mix K-300 m³

49 Beton Ready Mix K-350 m³

50 Beton Ready Mix K-400 m³

51 Beton Ready Mix K-500 m³

52 Aspal Emulsi Kg

53 Aspal Kg

54 Asbuton Halus Ton

55 Asphalt Trade Base ( ATB ) Ton

56 Laston ( Asphalt Concrete ) Ton

57 Hot Roll Sheet ( HRS ) Ton

58 Sand Sheet Ton

59 Kerosen / Minyak Tanah Ltr

60 B e n s i n Ltr

61 S o l a r Ltr

62 Minyak Pelumas / Olie Ltr

63 Minyak Fluks Ltr

64 Pipa Galvanis Dia 3" m'

65 Pipa Galvanis Dia 1" m'

66 Pipa Galvanis Dia 1,5" m'

67 Pipa Galvanis Dia 2" m'

68 Pipa Galvanis Dia. 1.6" Batang

69 Pipa Porus m'

70 Pipa Beton Precast tdk Bertulang Ø 30 cm, 125 cm Buah

71 Pipa Beton Precast tdk Bertulang Ø 40 cm, 125 cm Buah

72 Pipa Beton Precast tdk Bertulang Ø 50 cm, 125 cm Buah

73 Pipa Beton Precast tdk Bertulang Ø 60 cm, 250 cm Buah

74 Pipa Beton Precast tdk Bertulang Ø 80 cm, 250 cm Buah

75 Pipa Beton Precast tdk Bertulang Ø 90 cm, 250 cm Buah

76 Pipa Beton Precast tdk Bertulang Ø 100 cm, 250 cm Buah

77 Pipa Beton Precast Bertulang Ø 30 cm, 250 cm Buah

78 Pipa Beton Precast Bertulang Ø 40 cm, 250 cm Buah

79 Pipa Beton Precast Bertulang Ø 50 cm, 250 cm Buah

80 Pipa Beton Precast Bertulang Ø 60 cm, 250 cm Buah

81 Pipa Beton Precast Bertulang Ø 70 cm, 250 cm Buah

82 Pipa Beton Precast Bertulang Ø 80 cm, 250 cm Buah

83 Pipa Beton Precast Bertulang Ø 90 cm, 250 cm Buah

84 Pipa Beton Precast Bertulang Ø 100 cm, 250 cm Buah

85 Pipa Beton Precast Bertulang Ø 120 cm, 250 cm Buah

86 Pipa Beton Precast Bertulang Ø 130 cm, 250 cm Buah

87 Pipa Beton Precast Bertulang Ø 150 cm, 250 cm Buah

Page 4: AHS 2014 - upload OK FIX.pdf

HARGA

No. SATUAN SATUAN

( Rp.)

U R A I A N

88 Cat Kg

89 Cat Marka (Non Thermoplas) Kg

90 Cat Marka (Thermoplastic) Kg

91 Plastik Filter m²

92 Geotextile m²

93 Thinner Ltr

94 Glass Bead Kg

95 Pelat Rambu (Eng. Grade) Buah

96 Pelat Rambu (High I. Grade) Buah

97 Rel Pengaman m'

98 Gebalan Rumput m²

99 Mata Kucing Buah

100 Kansteen 15.25.40 Buah

101 Kansteen 13.20.40 Buah

102 Kansteen 15.28.40 Buah

103 Kansteen 20.25.60 Buah

104 Kansteen 30.25.50 Buah

105 Paving Block 8.10.20 m²

106 Paving Block 8.10.20 (Press Hydraulix / Press Mesin) m²

107 Paving Block 6.10.20 (Press Hydraulix / Press Mesin) m²

108 Matras Concrete Buah

109 Marmer Buah

110 Keramik Berwarna 30 x 30 m²

111 Plastic Sheet m²

112 Concrete Treated Base (CTB) m³

113 Gorong² Buis Beton, Ø 30 cm ; P = 100 cm m'

114 Gorong² Buis Beton, Ø 40 cm ; P = 100 cm m'

115 Gorong² Buis Beton, Ø 50 cm ; P = 100 cm m'

116 Gorong² Buis Beton, Ø 60 cm ; P = 100 cm m'

117 Gorong² Buis Beton (1/2), Ø U 30 cm ; P = 100 cm m'

118 Gorong² Buis Beton (1/2), Ø U 40 cm ; P = 100 cm m'

119 Gorong² Buis Beton (1/2), Ø U 50 cm ; P = 100 cm m'

120 Gorong² Buis Beton (1/2), Ø U 60 cm ; P = 100 cm m'

121 Kawat Bronjong Pabrikasi 0,5 x 1 x 2 m Buah

122 Karung Buah

123 Box Culvert BC 400 x 400 HD Buah

124 Box Culvert BC 500 x 500 HD Buah

125 Box Culvert BC 600 x 600 HD Buah

126 Box Culvert BC 800 x 800 HD Buah

127 Box Culvert BC 1000 x 1000 HD Buah

128 Box Culvert BC 1200 x 1200 HD Buah

129 Box Culvert BC 1400 x 1400 HD Buah

130 Box Culvert BC 1500 x 1500 HD Buah

131 Saluran Terbuka Tipe U-Ditch 300/300 ; P = 120 cm Buah

132 Saluran Terbuka Tipe U-Ditch 400/400 ; P = 120 cm Buah

Page 5: AHS 2014 - upload OK FIX.pdf

HARGA

No. SATUAN SATUAN

( Rp.)

U R A I A N

133 Saluran Terbuka Tipe U-Ditch 500/500 ; P = 120 cm Buah

134 Saluran Terbuka Tipe U-Ditch 600/600 ; P = 120 cm Buah

135 Saluran Terbuka Tipe U-Ditch 800/800 ; P = 120 cm Buah

136 Saluran Terbuka Tipe U-Ditch 800/1000 ; P = 120 cm Buah

137 Saluran Terbuka Tipe U-Ditch 800/1200 ; P = 120 cm Buah

138 Saluran Terbuka Tipe U-Ditch 1000/1000 ; P = 120 cm Buah

139 Saluran Terbuka Tipe U-Ditch 1200/1200 ; P = 120 cm Buah

140 Saluran Terbuka Tipe U-Ditch 1400/1400 ; P = 120 cm Buah

141 Saluran Terbuka Tipe U-Ditch 1500/1500 ; P = 120 cm Buah

142 Saluran Terbuka Tipe U-Ditch 1600/1600 ; P = 120 cm Buah

143 Sheet Pile Corrugated Type W-325-A-1000 P : 8-13, K-700 m'

144 Sheet Pile Corrugated Type W-325-B-1000 P : 8-14, K-700 m'

145 Sheet Pile Corrugated Type W-350-A-1000 P : 9-15, K-700 m'

146 Sheet Pile Corrugated Type W-350-B-1000 P : 10-15, K-700 m'

147 Sheet Pile Corrugated Type W-400-A-1000 P : 10-16, K-700 m'

148 Sheet Pile Corrugated Type W-400-B-1000 P : 11-16, K-700 m'

149 Sheet Pile Corrugated Type W-450-A-1000 P : 11-17, K-700 m'

150 Sheet Pile Corrugated Type W-450-B-1000 P : 12-17, K-700 m'

151 Flat Sheet Pile, K-700 m'

152 Tiang Pancang Type A2-300 - 6 s/d 8, Segmen Bottom m'

153 Tiang Pancang Type A2-300 - 6 s/d 8, Segmen Bottom Pencil m'

154 Tiang Pancang Type A2-300 - 6 s/d 8, Segmen Middle m'

155 Tiang Pancang Type A2-400 - 6 s/d 8, Segmen Bottom m'

156 Tiang Pancang Type A2-400 - 6 s/d 8, Segmen Bottom Pencil m'

157 Tiang Pancang Type A2-400 - 6 s/d 8, Segmen Middle m'

158 Pipa PVC D 15 cm / 6" m'

159 Mur Baut Kg

160 Besi Plat Strip Kg

161 Baja Anyaman Kg

162 Section Steel Kg

163 Fitting & Support / Reducer Buah

164 Non Shrinkage Mortar Kg

165 Epoxy Premarking Ltr

166 Epoxy Adhesive Ltr

167 Bearing Pad Elastomer Uk. 350 x 400 x 39 Buah

168 Expansion Joint Type Asphaltic Plug m'

169 Girder Type I, 20,60 m H = 70 cm Buah

170 Girder Type I, 45,70 m H = 240 cm Buah

Page 6: AHS 2014 - upload OK FIX.pdf
Page 7: AHS 2014 - upload OK FIX.pdf
Page 8: AHS 2014 - upload OK FIX.pdf
Page 9: AHS 2014 - upload OK FIX.pdf
Page 10: AHS 2014 - upload OK FIX.pdf

1 ASPHALT MIXING PLANT 0.00 0.0 0.00

2 ASPHALT FINISHER 0.0 0.0 0.00

3 ASPHALT SPRAYER 0.0 0.0 0.00

4 BULLDOZER 100-150 HP 0.0 -

5 COMPRESSOR 4000-6500 L\M 0.0 - 0.00

6 CONCRETE MIXER 0.3-0.6 M3 0.0 0.0 0.00

7 CRANE 10-15 TON 0.0 0.0 0.00

8 DUMP TRUCK 3.5 TON 0.0 0.0 0.00

9 DUMP TRUCK 10 TON 0.0 0.0 0.00

10 EXCAVATOR 80-140 HP 0.0 0.0 0.00

11 FLAT BED TRUCK 3-4 M3 0.0 0.0 ton

12 GENERATOR SET 0.0 0.0 0.00

13 MOTOR GRADER >100 HP 0.0 - 0.00

14 TRACK LOADER 75-100 HP 0.0 0.0 0.00

15 WHEEL LOADER 1.0-1.6 M3 0.0 0.0 0.00

16 THREE WHEEL ROLLER 6-8 T 0.0 0.0 0.00

17 TANDEM ROLLER 6-8 T. 0.0 0.0 0.00

18 TIRE ROLLER 8-10 T. 0.0 0.0 0.00

19 VIBRATORY ROLLER 5-8 T. 0.0 0.0 0.00

20 CONCRETE VIBRATOR 0.0 - 0.00

21 STONE CRUSHER 0.0 0.0 0.00

22 WATER PUMP 70-100 mm 0.0 -

23 WATER TANKER 3000-4500 L. 0.0 0.0 0.00

24 PEDESTRIAN ROLLER 0.0 0.0 0.00

25 TAMPER 0.0 0.0 0.00

26 JACK HAMMER - 0.00

27 FULVI MIXER 0.0 - 0.00

28 CONCRETE PUMP 0.0 0.0 0.00

29 TRAILER 20 TON 0.0 0.0 0.00

30 PILE DRIVER + HAMMER (2,5 Ton) 0.0 0.0 0.00

31 PILE DRIVER + HAMMER (15 Ton) 0.0 0.0 0.00

32 CRANE ON TRACK 35 TON 0.0 0.0 0.00

33 WELDING SET 0.0 0.0 0.00

34 BORE PILE MACHINE 0.0 0.0 0.00

35 ASPHALT LIQUID MIXER 0.0 0.0 0.00

36 TRONTON 0.0 0.0 0.00

37 COLD MILLING 0.0 0.0 0.00

38 ROCK DRILL BREAKER 0.0 0.0 0.00

39 COLD RECYCLER 0.0 2.2 0.00

40 HOT RECYCLER 0.0 0.0 0.00

41 AGGREGAT (CHIP) SPREADER 0.0 0.0 0.00

42 ASPHALT DISTRIBUTOR 0.0 0.0 0.00

43 SLIP FORM PAVER 0.0 0.0 0.00

44 CONCRETE PAN MIXER 0.0 0.0 0.00

45 CONCRETE BREAKER 0.0 0.0 0.00

46 ASPHALT TANKER 0.0 0.0 0.00

47 CEMENT TANKER 0.0 0.0 0.00

48 CONCRETE MIXER (350) 0.0 0.0 0.00

49 VIBRATING RAMMER 0.0 0.0 0.00

50 TRUK MIXER (AGITATOR) 0.0 0.0 0.00

51 BORE PILE MACHINE 0.0 0.0 0.00

52 CRANE ON TRACK 75-100 TON 0.0 0.0 0.00

53 BLENDING EQUIPMENT 0.0 0.0 0.00

54 ASPHALT LIQUID MIXER 0.0 0.0 0.00

55 TRUCK PICK UP 1.0 Ton

56 CONCRETE CUTTER 5.5 25.0 Ton

57 MINI BORE PILE MACHINE 0 - M

58 CRANE 100 - 150 TON

59 LINE MARKER TRUCK

60 FLAT BED TRUCK W/ CRANE 4 TON

61 TRAVELLER BEAM SET

62 HYDRAULIC JACK 150 TON

63 SINGLE CAGE ELEVATOR (HOIST)

64 LAUNCHING GIRDER

BIAYA SEWA ALAT

No. URAIAN HPKAPASITAS

ALAT

TOTAL BIAYA SEWA

ALAT / JAM

( Rp. )

Page 11: AHS 2014 - upload OK FIX.pdf

ITEM PEMBAYARAN : AGREGAT KASAR & HALUS

JENIS PEKERJAAN : PENGADAAN AGREGAT KASAR & HALUS

SATUAN PEMBAYARAN : M3

No. KODE KOEFISIEN SATUAN

I ASUMSI

II METHODE PELAKSANAAN

III PERHITUNGAN

ANALISA HARGA DASAR SATUAN BAHAN

U R A I A N

Page 12: AHS 2014 - upload OK FIX.pdf

ITEM PEMBAYARAN : AGREGAT KELAS A

JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS A

SATUAN PEMBAYARAN : M3

No. KODE KOEFISIEN SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

M17

M16

M08

(E15)

(E52)

(L01)

(L03)

ANALISA HARGA DASAR SATUAN BAHAN

U R A I A N

Page 13: AHS 2014 - upload OK FIX.pdf

ITEM PEMBAYARAN : AGREGAT KELAS B

JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS B

SATUAN PEMBAYARAN : M3

No. KODE KOEFISIEN SATUAN

I ASUMSI

II URUTAN PEKERJAAN

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

M17

M16

M08

(E15)

-

(L01)

(L03)

ANALISA HARGA DASAR SATUAN BAHAN

U R A I A N

Page 14: AHS 2014 - upload OK FIX.pdf

ITEM PEMBAYARAN : AGREGAT KELAS B

JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS C

SATUAN PEMBAYARAN : M3

No. KODE KOEFISIEN SATUAN

I ASUMSI

II METHODE PELAKSANAAN

III.1 PROSES PENCAMPURAN AGREGAT KELAS C

III.2 HARGA SATUAN BAHAN AGREGAT KELAS C

ANALISA HARGA DASAR SATUAN BAHAN

U R A I A N

Page 15: AHS 2014 - upload OK FIX.pdf
Page 16: AHS 2014 - upload OK FIX.pdf
Page 17: AHS 2014 - upload OK FIX.pdf
Page 18: AHS 2014 - upload OK FIX.pdf

ITEM PEMBAYARAN NO. : AGREGAT KELAS A

JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS A

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0712

2. Mandor (L03) jam 0.0356

B. BAHAN

1. Agregat 20-30 M17 M3

0.3164

2. Agregat 5-10 & 10-20 M16 M3

0.4745

3 Pasir Urug M01e M3

0.3390

JUMLAH HARGA BAHAN

C. PERALATAN

1. Wheel Loader E15 jam 0.0356

2. Blending Equpment E52 jam 0.0482

3 Alat Bantu Ls 1.0000

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

JUMLAH

ANALISA

HARGA DASAR SATUAN BAHAN

HARGA

(Rp.)

JUMLAH HARGA TENAGA

Page 19: AHS 2014 - upload OK FIX.pdf

ITEM PEMBAYARAN NO. : AGREGAT KELAS B

JENIS PEKERJAAN : PENGADAAN AGREGAT KELAS B

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0712 #REF! #REF!

2. Mandor (L03) jam 0.0356 #REF! #REF!

#REF!

B. BAHAN

1. Aggregat 20-30 M17 M3

0.2034 0.00 0.00

2. Agg 5 - 10 & 10 - 20 M16 M3

0.2034 0.00 0.00

3 Sirtu M08 M3

0.7231 0.00 0.00

0.00

C. PERALATAN

1. Wheel Loader E15 jam 0.0356 #DIV/0! #DIV/0!

2. Blending Equpment E52 jam 0.0482 #DIV/0! #DIV/0!

3 Alat Bantu Ls 1.0000 0.00 0.00

#DIV/0!

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #DIV/0!

HARGA

ANALISA

HARGA DASAR SATUAN BAHAN

JUMLAH

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 20: AHS 2014 - upload OK FIX.pdf

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : Pasir Pasang

Lokasi : Quarry

Tujuan : Lokasi Pekerjaan

HARGA

No. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)

I. ASUMSI

II. URUTAN KERJA

III. PERHITUNGAN

(E10)

Page 21: AHS 2014 - upload OK FIX.pdf

HARGA

No. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)

IV. HARGA SATUAN DASAR BAHAN

DI LOKASI BASE CAMP

M01

Page 22: AHS 2014 - upload OK FIX.pdf

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : Pasir Beton

Lokasi : Quarry

Tujuan : Lokasi Pekerjaan

HARGA

No. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)

I. ASUMSI

II. URUTAN KERJA

III. PERHITUNGAN

(E10)

Page 23: AHS 2014 - upload OK FIX.pdf

HARGA

No. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)

IV. HARGA SATUAN DASAR BAHAN

DI LOKASI PEKERJAAN

M44

M44

Page 24: AHS 2014 - upload OK FIX.pdf

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : Pasir Urug

Lokasi : Quarry

Tujuan : Lokasi Pekerjaan

HARGA

No. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)

I. ASUMSI

II. URUTAN KERJA

III. PERHITUNGAN

(E10)

Page 25: AHS 2014 - upload OK FIX.pdf

HARGA

No. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)

IV. HARGA SATUAN DASAR BAHAN

DI LOKASI PEKERJAAN

M44

M44

Page 26: AHS 2014 - upload OK FIX.pdf

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : Batu Kali

Lokasi : Quarry

Tujuan : Lokasi Pekerjaan

HARGA

No. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)

I. ASUMSI

II. URUTAN KERJA

III. PERHITUNGAN

(E10)

Page 27: AHS 2014 - upload OK FIX.pdf

HARGA

No. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)

IV. HARGA SATUAN DASAR BAHAN

DI LOKASI PEKERJAAN

M02

M02

Page 28: AHS 2014 - upload OK FIX.pdf

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : Batu Belah

Lokasi : Quarry

Tujuan : Lokasi Pekerjaan

HARGA

No. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)

I. ASUMSI

II. URUTAN KERJA

III. PERHITUNGAN

(E10)

Page 29: AHS 2014 - upload OK FIX.pdf

HARGA

No. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)

(E09)

IV. HARGA SATUAN DASAR BAHAN

DI LOKASI PEKERJAAN

M06

M06

Page 30: AHS 2014 - upload OK FIX.pdf

ANALISA HARGA DASAR SATUAN BAHAN

Jenis : Sirtu

Lokasi : Quarry

Tujuan : Lokasi Pekerjaan

HARGA

No. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)

I. ASUMSI

II. URUTAN KERJA

III. PERHITUNGAN

(E10)

Page 31: AHS 2014 - upload OK FIX.pdf

HARGA

No. URAIAN KODE KOEF. SATUAN SATUAN

(Rp.)

IV. HARGA SATUAN DASAR BAHAN

DI LOKASI PEKERJAAN

M16

M16

Page 32: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUANU R A I A N

ANALISA BIAYA SEWA ALAT

ASPHALT MIXING PLANT

Page 33: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUANU R A I A N

ASPHALT FINISHER

ANALISA BIAYA SEWA ALAT

Page 34: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ASPHALT SPRAYER

ANALISA BIAYA SEWA ALAT

U R A I A N

Page 35: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

BULLDOZER 100-150 HP

Page 36: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

COMPRESSOR 4000-6500 L\M

ANALISA BIAYA SEWA ALAT

U R A I A N

Page 37: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

CONCRETE MIXER 0.3-0.6 M3

Page 38: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

CRANE 10-15 TON

ANALISA BIAYA SEWA ALAT

U R A I A N

Page 39: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

DUMP TRUCK 3.5 TON

Page 40: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

DUMP TRUCK 10 TON

ANALISA BIAYA SEWA ALAT

U R A I A N

Page 41: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

EXCAVATOR 80-140 HP

Page 42: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

FLAT BED TRUCK 3-4 M3

ANALISA BIAYA SEWA ALAT

U R A I A N

Page 43: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

GENERATOR SET

Page 44: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

MOTOR GRADER >100 HP

Page 45: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

TRACK LOADER 75-100 HP

ANALISA BIAYA SEWA ALAT

U R A I A N

Page 46: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

WHEEL LOADER 1.0-1.6 M3

Page 47: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

THREE WHEEL ROLLER 6-8 T

Page 48: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

TANDEM ROLLER 6-8 T.

Page 49: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

TIRE ROLLER 8-10 T.

ANALISA BIAYA SEWA ALAT

U R A I A N

Page 50: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

VIBRATORY ROLLER 5-8 T.

Page 51: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

CONCRETE VIBRATOR

Page 52: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

STONE CRUSHER

Page 53: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

WATER PUMP 70-100 mm

ANALISA BIAYA SEWA ALAT

U R A I A N

Page 54: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

WATER TANKER 3000-4500 L.

Page 55: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

PEDESTRIAN ROLLER

Page 56: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

TAMPER

Page 57: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

JACK HAMMER

ANALISA BIAYA SEWA ALAT

U R A I A N

Page 58: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

FULVI MIXER

Page 59: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

CONCRETE PUMP

Page 60: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

TRAILER 20 TON

Page 61: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

PILE DRIVER + HAMMER (2,5 Ton)

ANALISA BIAYA SEWA ALAT

U R A I A N

Page 62: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

PILE DRIVER + HAMMER (15 Ton)

Page 63: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

CRANE ON TRACK 35 TON

Page 64: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

WELDING SET

Page 65: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

BORE PILE MACHINE

ANALISA BIAYA SEWA ALAT

U R A I A N

Page 66: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

ASPHALT LIQUID MIXER

Page 67: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ASPHALT LIQUID MIXER

ANALISA BIAYA SEWA ALAT

U R A I A N

Page 68: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

TRONTON

ANALISA BIAYA SEWA ALAT

U R A I A N

Page 69: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

COLD MILLING MACHINE

Page 70: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ROCK DRILL BREAKER

ANALISA BIAYA SEWA ALAT

U R A I A N

Page 71: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

COLD RECYCLER

Page 72: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

HOT RECYCLER

ANALISA BIAYA SEWA ALAT

U R A I A N

Page 73: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

AGGREGAT (CHIP) SPREADER

Page 74: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ASPHALT DISTRIBUTOR

ANALISA BIAYA SEWA ALAT

U R A I A N

Page 75: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

SLIP FORM PAVER

Page 76: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

CONCRETE PAN MIXER

ANALISA BIAYA SEWA ALAT

U R A I A N

Page 77: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

CONCRETE BREAKER

Page 78: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ASPHALT TANKER

ANALISA BIAYA SEWA ALAT

U R A I A N

Page 79: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

CEMENT TANKER

Page 80: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

CONCRETE MIXER (350)

Page 81: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

VIBRATING RAMMER

Page 82: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

TRUK MIXER (AGITATOR)

Page 83: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

BORE PILE MACHINE

Page 84: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

CRANE ON TRACK 75-100 TON

ANALISA BIAYA SEWA ALAT

U R A I A N

Page 85: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

BLENDING EQUIPMENT

Page 86: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

TRUCK PICK UP

Page 87: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUAN

ANALISA BIAYA SEWA ALAT

U R A I A N

CONCRETE CUTTER

Page 88: AHS 2014 - upload OK FIX.pdf

No. KODE KOEF. SATUANU R A I A N

MINI BORE PILE MACHINE

ANALISA BIAYA SEWA ALAT

Page 89: AHS 2014 - upload OK FIX.pdf

Analisa SNI-854

JENIS PEKERJAAN : Pasang Papan Nama Proyek

SATUAN PEMBAYARAN : Bh

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01.a) Org/hari 0.500

2. Tukang Kayu (L02) Org/hari 0.500

3. Kepala Tukang (L10) Org/hari 0.050

4. Mandor (L03) Org/hari 0.005

0.00

B. BAHAN

1. Kayu Kaso M40 M3

0.0261

2. Triplek 5 mm M39.c lbr 0.8400

3. Cat kayu M85 Kg 1.0000

4. Minyak Cat M102 Kg 0.5000

5. Paku M30 Kg 0.0250

6. Kwas - bh 2.0000

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA TENAGA

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 90: AHS 2014 - upload OK FIX.pdf

Analisa SNI-….

JENIS PEKERJAAN : Pembuatan Direksi Keet

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Org/hari 2.00

2. Tukang (L02) Org/hari 2.00

3. Kepala Tukang (L10) Org/hari 0.30

4. Mandor (L03) Org/hari 0.05

B. BAHAN

1. Kayu kaso dan papan M40 M3

0.192

2. Triplek 4 mm M39.b lbr 0.420

3. Paku M30 Kg 0.850

4. Semen PC M25 Zak 0.700

5. Pasir Beton M01b M3

0.100

6. Koral beton M07 lbr 0.250

7. Seng BJLS M115 lbr 0.250

C. PERALATAN

1. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA PERALATAN

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Page 91: AHS 2014 - upload OK FIX.pdf

Analisa SNI-164

JENIS PEKERJAAN : Pasangan Batu Bata ad. 1 Pc : 4 Psr

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Org/hari 0.32

2. Tukang Kayu (L02) Org/hari 0.1

3. Kepala Tukang (L10) Org/hari 0.01

4. Mandor (L03) Org/hari 0.015

B. BAHAN

1. Batu Bata M03 M3

70.000

2. Semen PC M25 Zak 0.230

3. Pasir Pasang M01a Kg 0.043

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 92: AHS 2014 - upload OK FIX.pdf

Analisa SNI-165

JENIS PEKERJAAN : Plesteran Dan Acian Camp. 1 Pc : 4 Psr

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Org/hari 0.2

2. Tukang Kayu (L02) Org/hari 0.15

3. Kepala Tukang (L10) Org/hari 0.015

4. Mandor (L03) Org/hari 0.01

B. BAHAN

1. Semen PC M25 Zak 0.104

2. Pasir Pasang M01a Kg 0.02

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA TENAGA

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 93: AHS 2014 - upload OK FIX.pdf

Analisa SNI-166

JENIS PEKERJAAN : Plesteran Siar Camp. 1 Pc : 2 Psr

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Org/hari 0.15

2. Tukang Kayu (L02) Org/hari 0.07

3. Kepala Tukang (L10) Org/hari 0.007

4. Mandor (L03) Org/hari 0.008

B. BAHAN

1. Semen PC M25 Zak 0.0864

2. Pasir Pasang M01a Kg 0.016

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA PERALATAN

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Page 94: AHS 2014 - upload OK FIX.pdf

Analisa SNI-856

JENIS PEKERJAAN : Pengecatan Kansteen

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Org/hari 0.02

2. Tukang Cat (L02) Org/hari 0.063

3. Kepala Tukang (L10) Org/hari 0.0063

4. Mandor (L03) Org/hari 0.0025

B. BAHAN

1. Cat Dasar M85 Kg 0.10

2. Cat Penutup M99 Kg 0.15

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA PERALATAN

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Page 95: AHS 2014 - upload OK FIX.pdf

Analisa SNI-857

JENIS PEKERJAAN : Pemasangan Keramik 30 x 30 Berwarna

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Org/hari 0.2500

2. Tukang Batu (L02) Org/hari 0.1200

3. Kepala Tukang (L10) Org/hari 0.0120

4. Mandor (L03) Org/hari 0.0125

B. BAHAN

1. Keramik Berwarna M113 M2

1.000

uk. 30 x 30 KW. 1

2. Semen Portland M26 Kg 11.380

3. Pasir Pasang M01a M3

0.042

4. Semen Warna M26a Kg 1.500

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA PERALATAN

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Page 96: AHS 2014 - upload OK FIX.pdf

Analisa SNI-858.a

JENIS PEKERJAAN : Pemasangan Rambu Lalu Lintas uk. 45 x 45 cm

SATUAN PEMBAYARAN : Bh

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. UPAH

1. Pemotongan dan Pengeboran Unit 1.0000

2. Pengelasan Cm 14.3100

3. Perakitan dan Penyetelan Unit 1.0000

4. Pengecatan Belakang Daun Rambu M2

0.2000

5. Ongkos Angkut ke Lokasi Bh 1.0000

0.00

B. BAHAN

1. Daun Rambu Alumunium 1,8 mm M2

0.200

dgn Reflective Sheeting

2. Pipa Galvanis 1,5" M60.c M' 3.000

3. Plat Strip uk. 4 x 30 mm M' 0.600

4. Angkur Besi Siku uk. 30 x 30 x 3 mm M' 0.600

5. Mur Baut Bh 4.000

6. Tutup Pipa dia. 1,5" Bh 1.000

7. Cor Pondasi Beton EI-616 BS M3

0.110

8. Galian Tanah dan Urug Kembali EI-213 M3

0.250

9. Urugan Pasir Bawah Pondasi EI-162 M3

0.040

10. Bekisting Pondasi EI-671 M3

0.910

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA UPAH

ANALISA

HARGA SATUAN PEKERJAAN

Page 97: AHS 2014 - upload OK FIX.pdf

Analisa SNI-858.b

JENIS PEKERJAAN : Pemasangan Rambu Lalu Lintas uk. 60 x 60 cm

SATUAN PEMBAYARAN : Bh

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. UPAH

1. Pemotongan dan Pengeboran Unit 1.0000

2. Pengelasan Cm 14.3100

3. Perakitan dan Penyetelan Unit 1.0000

4. Pengecatan Belakang Daun Rambu M2

0.3600

5. Ongkos Angkut ke Lokasi Bh 1.0000

B. BAHAN

1. Daun Rambu Alumunium 1,8 mm M2

0.360

dgn Reflective Sheeting

2. Pipa Galvanis 1,5" M60.c M' 3.000

3. Plat Strip uk. 4 x 30 mm M' 0.600

4. Angkur Besi Siku uk. 30 x 30 x 3 mm M' 0.600

5. Mur Baut Bh 4.000

6. Tutup Pipa dia. 1,5" Bh 1.000

7. Cor Pondasi Beton EI-616 BS M3

0.110

8. Galian Tanah dan Urug Kembali EI-213 M3

0.250

9. Urugan Pasir Bawah Pondasi EI-162 M3

0.040

10. Bekisting Pondasi EI-671 M3

0.910

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA UPAH

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

ANALISA

HARGA SATUAN PEKERJAAN

Page 98: AHS 2014 - upload OK FIX.pdf

Analisa SNI-858.c

JENIS PEKERJAAN : Pemasangan Rambu Lalu Lintas uk. 75 x 75 cm

SATUAN PEMBAYARAN : Bh

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. UPAH

1. Pemotongan dan Pengeboran Unit 1.0000

2. Pengelasan Cm 14.3100

3. Perakitan dan Penyetelan Unit 1.0000

4. Pengecatan Belakang Daun Rambu M2

0.5600

5. Ongkos Angkut ke Lokasi Bh 1.0000

B. BAHAN

1. Daun Rambu Alumunium 1,8 mm M2

0.560

dgn Reflective Sheeting

2. Pipa Galvanis 2" M60.d M' 3.000

3. Plat Strip uk. 4 x 30 mm M' 0.600

4. Angkur Besi Siku uk. 30 x 30 x 3 mm M' 0.600

5. Mur Baut Bh 4.000

6. Tutup Pipa dia. 2" Bh 1.000

7. Cor Pondasi Beton EI-616 BS M3

0.110

8. Galian Tanah dan Urug Kembali EI-213 M3

0.250

9. Urugan Pasir Bawah Pondasi EI-162 M3

0.040

10. Bekisting Pondasi EI-671 M3

0.910

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA PERALATAN

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA UPAH

JUMLAH HARGA BAHAN

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

Page 99: AHS 2014 - upload OK FIX.pdf

Analisa SNI-858.d

JENIS PEKERJAAN : Pemasangan Rambu Lalu Lintas uk. 90 x 90 cm

SATUAN PEMBAYARAN : Bh

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. UPAH

1. Pemotongan dan Pengeboran Unit 1.0000

2. Pengelasan Cm 14.3100

3. Perakitan dan Penyetelan Unit 1.0000

4. Pengecatan Belakang Daun Rambu M2

0.8100

5. Ongkos Angkut ke Lokasi Bh 1.0000

B. BAHAN

1. Daun Rambu Alumunium 2 mm M2

0.810

dgn Reflective Sheeting

2. Pipa Galvanis 2" M60.d M' 4.000

3. Plat Strip uk. 4 x 40 mm M' 1.600

4. Angkur Besi Siku uk. 30 x 30 x 3 mm M' 0.800

5. Mur Baut Bh 8.000

6. Tutup Pipa dia. 2" Bh 1.000

7. Cor Pondasi Beton EI-616 BS M3

0.110

8. Galian Tanah dan Urug Kembali EI-213 M3

0.250

9. Urugan Pasir Bawah Pondasi EI-162 M3

0.040

10. Bekisting Pondasi EI-671 M3

1.120

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA UPAH

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

ANALISA

HARGA SATUAN PEKERJAAN

Page 100: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN LUMPUR DAN PEMBUANGAN ( ALAT )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.1399

2. Mandor (L03) jam 0.0350

JUMLAH HARGA TENAGA

B. BAHAN

JUMLAH HARGA BAHAN

C. PERALATAN

1. Excavator E10 jam 0.0350

2. Dump Truck E08 jam 0.3536

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

Analisa EI-113

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

Page 101: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN LUMPUR BUANG DITEMPAT ( ALAT )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.2449

2. Mandor (L03) jam 0.0350

JUMLAH HARGA TENAGA

B. BAHAN

JUMLAH HARGA BAHAN

C. PERALATAN

1. Excavator E10 jam 0.0350

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

HARGA

(Rp.)

Analisa EI-113.a

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

Page 102: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN LUMPUR DAN PEMBUANGAN ( MANUAL )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01.a) jam 4.1481

2. Mandor (L03) jam 0.1296

JUMLAH HARGA TENAGA

B. BAHAN

JUMLAH HARGA BAHAN

C. PERALATAN

1. Truck Pick Up E53 jam 0.5428

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

HARGA

(Rp.)

Analisa EI-114

ANALISA

HARGA SATUAN PEKERJAAN

Page 103: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN LUMPUR BUANG DITEMPAT ( MANUAL)

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01.a) jam 4.1481

2. Mandor (L03) jam 0.1296

JUMLAH HARGA TENAGA

B. BAHAN

JUMLAH HARGA BAHAN

C. PERALATAN

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

HARGA

(Rp.)

Analisa EI-115

ANALISA

HARGA SATUAN PEKERJAAN

Page 104: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN BATU KALI UNTUK SALURAN (ALAT)

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 2.6707

2. Tukang Batu (L02) jam 1.1446

3. Mandor (L03) jam 0.3815

B. BAHAN

1. Batu Kali M02 M3 1.0800

2. Semen (PC) M25 zak 3.2200

3. Pasir Pasang M01a M3 0.4829

C. PERALATAN

1. Conc. Mixer E06 jam 0.3815

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

Analisa EI-121

ANALISA

Page 105: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN BATU KALI UNTUK SALURAN (BURUH)

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 11.2000

2. Tukang Batu (L02) jam 5.6000

3. Mandor (L03) jam 1.4000

B. BAHAN

1. Batu Kali M02 M3 1.0800

2. Semen (PC) M25 zak 3.2200

3. Pasir Pasang M01a M3 0.4829

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-122

ANALISA

HARGA SATUAN PEKERJAAN

Page 106: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN BATU KOSONG

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 4.2000

2. Tukang Batu (L02) jam 1.4000

3. Mandor (L03) jam 1.4000

B. BAHAN

1. Batu Kali M02 M3 1.1968

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-122.a

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

Page 107: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton, Ø 30 cm ; P = 100 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 2.3333

2. Tukang (L02) jam 0.9333

3. Mandor (L03) jam 0.4667

B. BAHAN

1. Gorong-gorong Buis Beton M117 bh 1.0000

Ø 30 cm panj. 100 cm

2. Urugan Porus (EI-241) M3 0.1084

C. PERALATAN

1. Tamper E25 jam 0.7976

2. Flat Bed Truck E11 jam 0.0214

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

Analisa EI-1311

ANALISA

Page 108: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton, Ø 40 cm ; P = 100 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 2.3333

2. Tukang (L02) jam 0.9333

3. Mandor (L03) jam 0.4667

B. BAHAN

1. Gorong-gorong Buis Beton M118 bh 1.0000

Ø 40 cm panj. 100 cm

2. Urugan Porus (EI-241) M3 0.1189

C. PERALATAN

1. Tamper E25 jam 0.9401

2. Flat Bed Truck E11 jam 0.0214

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-1312

ANALISA

HARGA SATUAN PEKERJAAN

Page 109: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton, Ø 50 cm ; P = 100 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 2.3333

2. Tukang (L02) jam 0.9333

3. Mandor (L03) jam 0.4667

B. BAHAN

1. Gorong-gorong Buis Beton M119 bh 1.0000

Ø 50 cm panj. 100 cm

2. Urugan Porus (EI-241) M3 0.1294

C. PERALATAN

1. Tamper E25 jam 1.0881

2. Flat Bed Truck E11 jam 0.0214

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-1313

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

Page 110: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton, Ø 60 cm ; P = 100 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 2.3333

2. Tukang (L02) jam 0.9333

3. Mandor (L03) jam 0.4667

B. BAHAN

1. Gorong-gorong Buis Beton M120 bh 1.0000

Ø 60 cm panj. 100 cm

2. Urugan Porus (EI-241) M3 0.1399

C. PERALATAN

1. Tamper E25 jam 1.2292

2. Flat Bed Truck E11 jam 0.0214

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

Analisa EI-1314

ANALISA

Page 111: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton (1/2), Ø U 30 cm ; P = 100 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 1.1200

2. Tukang (L02) jam 0.2800

3. Mandor (L03) jam 0.2800

B. BAHAN

1. Gorong-gorong Buis Beton (1/2) M117.a bh 1.0000

Ø U 30 cm panj. 100 cm

2. Urugan Porus (EI-241) M3 0.1084

C. PERALATAN

1. Tamper E25 jam 0.4119

2. Flat Bed Truck E11 jam 0.0129

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-1321

ANALISA

HARGA SATUAN PEKERJAAN

Page 112: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton (1/2), Ø U 40 cm ; P = 100 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 1.1200

2. Tukang (L02) jam 0.2800

3. Mandor (L03) jam 0.2800

B. BAHAN

1. Gorong-gorong Buis Beton (1/2) M118.a bh 1.0000

Ø U 40 cm panj. 100 cm

2. Urugan Porus (EI-241) M3 0.1189

C. PERALATAN

1. Tamper E25 jam 0.4844

2. Flat Bed Truck E11 jam 0.0129

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-1322

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

Page 113: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton (1/2), Ø U 50 cm ; P = 100 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 1.1200

2. Tukang (L02) jam 0.2800

3. Mandor (L03) jam 0.2800

B. BAHAN

1. Gorong-gorong Buis Beton (1/2) M119.a bh 1.0000

Ø U 50 cm panj. 100 cm

2. Urugan Porus (EI-241) M3 0.1294

C. PERALATAN

1. Tamper E25 jam 0.5596

2. Flat Bed Truck E11 jam 0.0129

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

Analisa EI-1323

ANALISA

Page 114: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton (1/2), Ø U 60 cm ; P = 100 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 1.1200

2. Tukang (L02) jam 0.2800

3. Mandor (L03) jam 0.2800

B. BAHAN

1. Gorong-gorong Buis Beton (1/2) M120.a bh 1.0000

Ø U 60 cm panj. 100 cm

2. Urugan Porus (EI-241) M3 0.1399

C. PERALATAN

1. Tamper E25 jam 0.6376

2. Flat Bed Truck E11 jam 0.0129

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-1324

ANALISA

HARGA SATUAN PEKERJAAN

Page 115: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Precast Pipa Beton Tak Bertulang, Ø 30 cm ; P = 125 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 2.3333

2. Tukang (L02) jam 0.9333

3. Mandor (L03) jam 0.4667

B. BAHAN

1. Gorong-gorong tidak bertulang M62 bh 0.8000

Ø 30 cm panj. 125 cm

2. Urugan Porus (EI-241) M3 0.1084

C. PERALATAN

1. Tamper E25 jam 0.7976

2. Flat Bed Truck E11 jam 0.0214

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-130

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

Page 116: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON TAK BERTULANG Ø 40 cm ; P = 125 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 2.3333

2. Tukang (L02) jam 0.9333

3. Mandor (L03) jam 0.4667

B. BAHAN

1. Gorong-gorong tidak bertulang M62.a bh 0.8000

Ø 40 cm panj. 125 cm

2. Urugan Porus (EI-241) M3 0.1189

C. PERALATAN

1. Tamper E25 jam 0.9401

2. Flat Bed Truck E11 jam 0.0214

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

Analisa EI-131

ANALISA

Page 117: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON TAK BERTULANG Ø 50 cm ; P = 125 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 4.9000

2. Tukang (L02) jam 1.4000

3. Mandor (L03) jam 0.7000

0.00

B. BAHAN

1. Gorong-gorong tidak bertulang Ø 50 cm M62.b bh 0.8000

panj. 125 cm

2. Urugan Porus (EI-241) M3 0.1295

C. PERALATAN

1. Tamper E25 Jam 1.0903

2. Flat Bed Truck E11 Jam 0.0321

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-132

ANALISA

HARGA SATUAN PEKERJAAN

Page 118: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON TAK BERTULANG Ø 60 cm, Panj. 250 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 14.0000

2. Tukang (L02) Jam 1.7500

3. Mandor (L03) Jam 1.7500

B. BAHAN

1. Gorong-gorong tidak bertulang Ø 60 cm M62.c bh 0.4000

panj. 250 cm

2. Urugan Porus (EI-241) M3 0.1548

C. PERALATAN

1. Tamper E25 Jam 1.5638

2. Flat Bed Truck E11 Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-133

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

Page 119: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON TAK BERTULANG Ø 80 cm, Panj. 250 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 14.0000

2. Tukang (L02) Jam 1.7500

3. Mandor (L03) Jam 1.7500

B. BAHAN

1. Gorong-gorong tidak bertulang Ø 80 cm M62.d bh 0.4000

panj. 250 cm

2. Urugan Porus (EI-241) M3 0.2216

C. PERALATAN

1. Tamper E25 Jam 1.9379

2. Flat Bed Truck E11 Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

Analisa EI-134

ANALISA

Page 120: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON TAK BERTULANG Ø 90 cm, P = 250 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 14.0000

2. Tukang (L02) Jam 1.7500

3. Mandor (L03) Jam 1.7500

B. BAHAN

1. Gorong-gorong tidak bertulang Ø 90 cm M62.e bh 0.4000

panj. 250 cm

2. Urugan Porus (EI-241) M3 0.3115

C. PERALATAN

1. Tamper E25 Jam 2.3918

2. Flat Bed Truck E11 Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-135

ANALISA

HARGA SATUAN PEKERJAAN

Page 121: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON TAK BERTULANG Ø 100 cm, P = 250 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 14.0000

2. Tukang (L02) Jam 1.7500

3. Mandor (L03) Jam 1.7500

B. BAHAN

1. Gorong-gorong tidak bertulang Ø 100 cm M62.f bh 0.4000

panj. 250 cm

2. Urugan Porus (EI-241) M3 0.3115

C. PERALATAN

1. Tamper E25 Jam 2.3918

2. Flat Bed Truck E11 Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-136

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

Page 122: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 30 cm, P = 245 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 14.0000

2. Tukang (L02) Jam 1.7500

3. Mandor (L03) Jam 1.7500

B. BAHAN

1. Gorong-gorong bertulang Ø 30 cm M63 bh 0.4082

panj. 250 cm

2. Urugan Porus (EI-241) M3 0.1292

C. PERALATAN

1. Tamper E25 Jam 0.0311

2. Flat Bed Truck E11 Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

Analisa EI-140

ANALISA

Naura Amanda Vianti
Highlight
Naura Amanda Vianti
Highlight
Page 123: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 40 cm, P = 245 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 14.0000

2. Tukang (L02) Jam 1.7500

3. Mandor (L03) Jam 1.7500

B. BAHAN

1. Gorong-gorong bertulang Ø 40 cm M63.a bh 0.4082

panj. 250 cm

2. Urugan Porus (EI-241) M3 0.1397

C. PERALATAN

1. Tamper E25 Jam 1.1509

2. Flat Bed Truck E11 Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-141

ANALISA

HARGA SATUAN PEKERJAAN

Page 124: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 50 cm, P = 245 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 14.0000

2. Tukang (L02) Jam 1.7500

3. Mandor (L03) Jam 1.7500

B. BAHAN

1. Gorong-gorong bertulang Ø 50 cm M63.b bh 0.4082

panj. 250 cm

2. Urugan Porus (EI-241) M3 0.1502

C. PERALATAN

1. Tamper E25 Jam 1.3241

2. Flat Bed Truck E11 Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-142

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

Page 125: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 60 cm, P = 250 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 14.0000

2. Tukang (L02) Jam 1.7500

3. Mandor (L03) Jam 1.7500

B. BAHAN

1. Gorong-gorong bertulang Ø 60 cm M63.c bh 0.4082

panj. 250 cm

2. Urugan Porus (EI-241) M3 0.1607

C. PERALATAN

1. Tamper E25 Jam 1.5026

2. Flat Bed Truck E11 Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

Analisa EI-143

ANALISA

Page 126: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 70 cm, P = 250 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 14.0000

2. Tukang (L02) Jam 1.7500

3. Mandor (L03) Jam 1.7500

B. BAHAN

1. Gorong-gorong bertulang Ø 70 cm M63.d bh 0.4082

panj. 250 cm

2. Urugan Porus (EI-241) M3 0.1808

C. PERALATAN

1. Tamper E25 Jam 1.7074

2. Flat Bed Truck E11 Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-144

ANALISA

HARGA SATUAN PEKERJAAN

Page 127: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 80 cm, P = 250 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 14.0000

2. Tukang (L02) Jam 1.7500

3. Mandor (L03) Jam 1.7500

B. BAHAN

1. Gorong-gorong bertulang Ø 80 cm M63.e bh 0.4082

panj. 250 cm

2. Urugan Porus (EI-241) M3 0.1808

C. PERALATAN

1. Tamper E25 Jam 1.7074

2. Flat Bed Truck E11 Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-145

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

Page 128: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 90 cm, P = 250 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 14.0000

2. Tukang (L02) Jam 1.7500

3. Mandor (L03) Jam 1.7500

B. BAHAN

1. Gorong-gorong bertulang Ø 90 cm M63.f bh 0.4082

panj. 250 cm

2. Urugan Porus (EI-241) M3 0.2637

C. PERALATAN

1. Tamper E25 Jam 2.1468

2. Flat Bed Truck E11 Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

Analisa EI-146

ANALISA

Page 129: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 100 cm, P = 250 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 14.0000

2. Tukang (L02) Jam 1.7500

3. Mandor (L03) Jam 1.7500

B. BAHAN

1. Gorong-gorong bertulang Ø 100 cm M63.g bh 0.4082

panj. 250 cm

2. Urugan Porus (EI-241) M3 0.3103

C. PERALATAN

1. Tamper E25 Jam 2.3776

2. Flat Bed Truck E11 Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-147

ANALISA

HARGA SATUAN PEKERJAAN

Page 130: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 120 cm, P = 250 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 14.0000

2. Tukang (L02) Jam 1.7500

3. Mandor (L03) Jam 1.7500

B. BAHAN

1. Gorong-gorong bertulang Ø 120 cm M63.h bh 0.4082

panj. 250 cm

2. Urugan Porus (EI-241) M3 0.4158

C. PERALATAN

1. Tamper E25 Jam 2.8833

2. Flat Bed Truck E11 Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-148

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

Page 131: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 150 cm, P = 250 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 14.0000

2. Tukang (L02) Jam 1.7500

3. Mandor (L03) Jam 1.7500

B. BAHAN

1. Gorong-gorong bertulang Ø 150 cm M63.j bh 0.4082

panj. 250 cm

2. Urugan Porus (EI-241) M3 0.5906

C. PERALATAN

1. Tamper E25 Jam 3.5950

2. Flat Bed Truck E11 Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

Analisa EI-149

ANALISA

Page 132: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG-GORONG PIPA BAJA BERGELOMBANG

SATUAN PEMBAYARAN : TON

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 64.6154

2. Tukang (L02) Jam 5.3846

3. Mandor (L03) Jam 5.3846

B. BAHAN

1. Pipa Baja Glb. M35 Kg 1,050.00

2. Urugan Porus (EI-241) M3 2.5374

3. Mat. Pilihan M10 M3 18.7631

C. PERALATAN

1. Tamper E25 Jam 3.2883

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-150

ANALISA

HARGA SATUAN PEKERJAAN

Page 133: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong-Gorong Pipa beton tanpa tulangan diameter dalam 20 cm sampai 30 cm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 1.7500 #REF! #REF!

2. Tukang (L02) jam 0.0000 #REF! #REF!

3. Mandor (L03) jam 0.3500 #REF! #REF!

#REF!

B. BAHAN

1. Beton K-175 M41 M3 0.0643 0.00 0.00

2. Urugan Porus (EI-241) M3 0.0714 0.00 0.00

0.00

C. PERALATAN

1. Tamper E25 jam 0.0625 0.00 0.00

2. Flat Bed Truck E11 jam 0.0210 0.00 0.00

3. Alat Bantu Ls 1.0000 0.00 0.00

0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!

E. OVERHEAD & PROFIT 10.0 % x D #REF!

F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-161

Analisa EI-237

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

Page 134: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Timbunan Porous atau Bahan Penyaring (Filter)

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 2.8000

2. Mandor (L03) Jam 0.7000

B. BAHAN

1. Agregat Kasar M13 M3 0.5500

2. Pasir M01b M3 0.5500

C. PERALATAN

1. Tamper E25 Jam 0.1606

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

ANALISA

Page 135: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Timbunan Pasir

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 2.8000

2. Mandor (L03) Jam 0.7000

B. BAHAN

1 Pasir Urug M01e M3 1.1000

C. PERALATAN

1. Tamper E25 Jam 0.1606

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-162

ANALISA

HARGA SATUAN PEKERJAAN

Page 136: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Anyaman Filter Plastik

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.5600 #REF! #REF!

2. Tukang (L02) Jam 0.2800 #REF! #REF!

3. Mandor (L03) Jam 0.2800 #REF! #REF!

#REF!

B. BAHAN

1. Filter Plastik M99 M2 1.0500 0.00 0.00

0.00

C. PERALATAN

1. Alat Bantu Ls 1.0000 0.00 0.00

0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!

E. OVERHEAD & PROFIT 10.0 % x D #REF!

F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-243

Analisa EI-242

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

Page 137: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 1.1667 #REF! #REF!

2. Tukang (L02) Jam 0.5833 #REF! #REF!

3. Mandor (L03) Jam 0.5833 #REF! #REF!

#REF!

B. BAHAN

1. Pipa Porous M61 M' 1.0500 0.00 0.00

2. Semen (PC) M25 Kg 0.00001 0.00 0.00

3 Mortar M3 0.0900 0.00 0.00

4 Pasir M01a M3 0.0002 0.00 0.00

5 Filter Stripe, dll Ls 1.0000 0.00 0.00

0.00

C. PERALATAN

1. Alat Bantu Ls 1.0000 0.00 0.00

0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) #REF!

E. OVERHEAD & PROFIT 10.0 % x D #REF!

F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

ANALISA

Page 138: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Kisdam

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 1.7500

2. Tukang (L02) Jam 0.8750

3. Mandor (L03) Jam 0.4375

B. BAHAN

1. Karung M114 buah 8.000

2. Cerucuk Dolken Ø 8 - 10 cm M38.a M' 2.0000

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-171

ANALISA

HARGA SATUAN PEKERJAAN

Page 139: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 400 x 400 HD

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 14.0000

2. Tukang Jam 1.7500

3. Mandor Jam 1.7500

B. BAHAN

1. Box Culvert BC 400 x 400 HD bh 1.0000

panjang 100 cm

2. Urugan Porus M3 0.1029

C. PERALATAN

1. Tamper Jam 0.0248

2. Flat Bed Truck Jam 0.6902

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

Page 140: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 500 x 500 HD

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 14.0000

2. Tukang Jam 1.7500

3. Mandor Jam 1.7500

B. BAHAN

1. Box Culvert BC 500 x 500 HD bh 1.0000

panjang 100 cm

2. Urugan Porus M3 0.1155

C. PERALATAN

1. Tamper Jam 0.7995

2. Flat Bed Truck Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

Page 141: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 600 x 600 HD

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 14.0000

2. Tukang Jam 1.7500

3. Mandor Jam 1.7500

B. BAHAN

1. Box Culvert BC 600 x 600 HD bh 1.0000

panjang 100 cm

2. Urugan Porus M3 0.1281

C. PERALATAN

1. Tamper Jam 0.9088

2. Flat Bed Truck Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 142: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 800 x 800 HD

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 14.0000

2. Tukang Jam 1.7500

3. Mandor Jam 1.7500

B. BAHAN

1. Box Culvert BC 800 x 800 HD bh 1.0000

panjang 100 cm

2. Urugan Porus M3 0.1890

C. PERALATAN

1. Tamper Jam 1.1714

2. Flat Bed Truck Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 143: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 1000 x 1000 HD

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 18.6667

2. Tukang Jam 2.3333

3. Mandor Jam 2.3333

B. BAHAN

1. Box Culvert BC 1000 x 1000 HD bh 1.0000

panjang 100 cm

2. Urugan Porus M3 0.2678

C. PERALATAN

1. Tamper Jam 1.3675

2. Flat Bed Truck Jam 0.1071

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

ANALISA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 144: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 1200 x 1200 HD

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 18.6667

2. Tukang Jam 2.3333

3. Mandor Jam 2.3333

B. BAHAN

1. Box Culvert BC 1200 x 1200 HD bh 1.0000

panjang 100 cm

2. Urugan Porus M3 0.3629

C. PERALATAN

1. Tamper Jam 1.5853

2. Flat Bed Truck Jam 0.1071

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

ANALISA

HARGA SATUAN PEKERJAAN

Page 145: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 1400 x 1400 HD

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 18.6667

2. Tukang Jam 2.3333

3. Mandor Jam 2.3333

B. BAHAN

1. Box Culvert BC 1400 x 1400 HD bh 1.0000

panjang 100 cm

2. Urugan Porus M3 0.4763

C. PERALATAN

1. Tamper Jam 1.8251

2. Flat Bed Truck Jam 0.1071

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

Page 146: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 1500 x 1500 HD

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 18.6667

2. Tukang Jam 2.3333

3. Mandor Jam 2.3333

B. BAHAN

1. Box Culvert BC 1400 x 1400 HD bh 1.0000

panjang 100 cm

2. Urugan Porus M3 0.5434

C. PERALATAN

1. Tamper Jam 1.9653

2. Flat Bed Truck Jam 0.1071

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

Page 147: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 300/300

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 8.0000

2. Tukang Jam 1.0000

3. Mandor Jam 1.0000

B. BAHAN

1. U-Ditch uk. 300/300 bh 0.8333

panjang 120 cm

2. Urugan Porus M3 0.0830

C. PERALATAN

1. Tamper Jam 0.3255

2. Flat Bed Truck Jam 0.0459

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 148: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 400/400

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 11.2000

2. Tukang Jam 1.4000

3. Mandor Jam 1.4000

B. BAHAN

1. U-Ditch uk. 400/400 bh 0.8333

panjang 120 cm

2. Urugan Porus M3 0.1050

C. PERALATAN

1. Tamper Jam 0.4428

2. Flat Bed Truck Jam 0.0643

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 149: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 500/500

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 14.0000

2. Tukang Jam 1.7500

3. Mandor Jam 1.7500

B. BAHAN

1. U-Ditch uk. 500/500 bh 0.8333

panjang 120 cm

2. Urugan Porus M3 0.1155

C. PERALATAN

1. Tamper Jam 0.5086

2. Flat Bed Truck Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

ANALISA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 150: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 600/600

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 14.0000

2. Tukang Jam 1.7500

3. Mandor Jam 1.7500

B. BAHAN

1. U-Ditch uk. 600/600 bh 0.8333

panjang 120 cm

2. Urugan Porus M3 0.1260

C. PERALATAN

1. Tamper Jam 0.5743

2. Flat Bed Truck Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

ANALISA

HARGA SATUAN PEKERJAAN

Page 151: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 800/800

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 14.0000

2. Tukang Jam 1.7500

3. Mandor Jam 1.7500

B. BAHAN

1. U-Ditch uk. 800/800 bh 0.8333

panjang 120 cm

2. Urugan Porus M3 0.1764

C. PERALATAN

1. Tamper Jam 0.7130

2. Flat Bed Truck Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

Page 152: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 800/1000

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 14.0000

2. Tukang Jam 1.7500

3. Mandor Jam 1.7500

B. BAHAN

1. U-Ditch uk. 800/1000 bh 0.8333

panjang 120 cm

2. Urugan Porus M3 0.1764

C. PERALATAN

1. Tamper Jam 0.8142

2. Flat Bed Truck Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-195.a

ANALISA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

Page 153: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 800/1200

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 14.0000

2. Tukang Jam 1.7500

3. Mandor Jam 1.7500

B. BAHAN

1. U-Ditch uk. 800/1200 bh 0.8333

panjang 120 cm

2. Urugan Porus M3 0.1764

C. PERALATAN

1. Tamper Jam 0.9154

2. Flat Bed Truck Jam 0.0803

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 154: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 1000/1000

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 18.6667

2. Tukang Jam 2.3333

3. Mandor Jam 2.3333

B. BAHAN

1. U-Ditch uk. 1000/1000 bh 0.8333

panjang 120 cm

2. Urugan Porus M3 0.2520

C. PERALATAN

1. Tamper Jam 0.8577

2. Flat Bed Truck Jam 0.1071

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 155: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 1200/1200

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 18.6667

2. Tukang Jam 2.3333

3. Mandor Jam 2.3333

B. BAHAN

1. U-Ditch uk. 1200/1200 bh 0.8333

panjang 120 cm

2. Urugan Porus M3 0.3402

C. PERALATAN

1. Tamper Jam 1.0055

2. Flat Bed Truck Jam 0.1071

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

ANALISA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 156: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 1400/1400

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 18.6667

2. Tukang Jam 2.3333

3. Mandor Jam 2.3333

B. BAHAN

1. U-Ditch uk. 1400/1400 bh 0.8333

panjang 120 cm

2. Urugan Porus M3 0.4410

C. PERALATAN

1. Tamper Jam 1.1563

2. Flat Bed Truck Jam 0.1071

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

ANALISA

HARGA SATUAN PEKERJAAN

Page 157: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 1600/1600

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 28.0000

2. Tukang Jam 3.5000

3. Mandor Jam 3.5000

B. BAHAN

1. U-Ditch uk. 1600/1600 bh 0.8333

panjang 120 cm

2. Urugan Porus M3 0.5544

C. PERALATAN

1. Tamper Jam 1.3101

2. Flat Bed Truck Jam 0.1606

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

Page 158: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN TANAH BIASA DAN PEMBUANGAN ( ALAT )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 0.0149

2. Mandor Jam 0.0075

B. BAHAN

C. PERALATAN

1. Excavator Jam 0.0075

2. Dump Truck Jam 0.3064

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

Page 159: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN TANAH BIASA PEMBUANGAN ( MANUAL ) / PU

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 3.9375

2. Mandor Jam 0.2188

B. BAHAN

C. PERALATAN

1. Pick Up Jam 0.8226

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 160: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN TANAH BIASA BUANG DITEMPAT ( MANUAL )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 7.0000

2. Mandor Jam 0.2188

B. BAHAN

C. PERALATAN

1. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA PERALATAN

Page 161: AHS 2014 - upload OK FIX.pdf

0

JENIS PEKERJAAN : GALIAN BATU / TANAH KERAS ( MANUAL )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01.a) Jam 9.1000

2. Mandor (L03) Jam 0.3500

B. BAHAN

C. PERALATAN

1. Pick Up E53 Jam 1.1349 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 162: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN PERKERASAN BERASPAL ( MANUAL )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 38.5000

2. Mandor Jam 3.5000

B. BAHAN

C. PERALATAN

1. Truck Pick Up Jam 1.8158

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

JUMLAH

HARGA SATUAN PEKERJAAN

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 163: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : TIMBUNAN TANAH SETEMPAT

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 6.3000

2. Mandor Jam 0.1167

B. BAHAN

C. PERALATAN

1. Tamper Jam 0.1606

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Page 164: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : TIMBUNAN TANAH PILIHAN

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 6.4167

2. Mandor Jam 0.1167

B. BAHAN

1. Bahan pilihan M3 1.20

C. PERALATAN

1. Tamper Jam 0.1606

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 165: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : TIMBUNAN BADAN JALAN TANAH PILIHAN ( ALAT )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 1.7391

2. Mandor Jam 0.4348

B. BAHAN

1. Tanah pilihan M3 1.2000

C. PERALATAN

1. Motor Grader Jam 0.0020

2. Tandem Roller 6 - 8 T Jam 0.0289

3. Water Tanker Jam 0.0070

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 166: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : TIMBUNAN BADAN JALAN TANAH PILIHAN ( MANUAL)

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 0.0000

2. Mandor Jam 0.0000

B. BAHAN

1. Tanah pilihan M3 0.0000

C. PERALATAN

1. Tandem Roller 6 - 8 T Jam 0.0000

2. Water Tanker Jam 0.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

ANALISA

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 167: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYIAPAN BADAN JALAN ( MENGGUNAKAN ALAT )

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja jam 0.0012

2. Mandor jam 0.0003

B. BAHAN

C. PERALATAN

1. Motor Grader jam 0.0003

2. Three Wheel Roller 6 - 8 Ton jam 0.0028

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 168: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYIAPAN BADAN JALAN ( MANUAL )

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja jam 0.1750

2. Mandor jam 0.0022

B. BAHAN

C. PERALATAN

1. Three Wheel Roller 6 - 8 Ton jam 0.0028

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

ANALISA

HARGA SATUAN PEKERJAAN

Page 169: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI AGREGAT Kls. A ( ALAT )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 0.0561

2. Mandor Jam 0.0080

B. BAHAN

1. Agregat A M3 1.1864

C. PERALATAN

1 Motor Grader Jam 0.0094

2 Tandem Roller 6 - 8 T Jam 0.0474

3 Water Tanker Jam 0.0141

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 170: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI AGREGAT Kls. A ( MANUAL )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa jam 0.5000

2. Mandor jam 0.0667

B. BAHAN

1. Agregat A M3 1.1864

C. PERALATAN

1. Tandem Roller 6 - 8 T jam 0.0474

2. Water Tanker jam 0.0141

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 171: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI AGREGAT Kls. B, CBR MIN 60 % ( ALAT )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 0.0561

2. Mandor Jam 0.0080

B. BAHAN

1. Agregat B M3 1.1864

C. PERALATAN

1 Motor Grader Jam 0.0094

2 Tandem Roller 6 - 8 T Jam 0.0474

3 Water Tanker Jam 0.0141

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

HARGA SATUAN PEKERJAAN

ANALISA

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 172: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI AGREGAT Kls. B, CBR MIN 60 % ( MANUAL )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa jam 3.7931

2. Mandor jam 0.0214

B. BAHAN

1. Agregat Klass B M3 1.1864

C. PERALATAN

1. Tandem Roller 6 - 8 T E17 jam 0.0527

2. Water Tanker E23 jam 0.0141

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Page 173: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LPS. POND. AGG. KLS. A ( ALAT )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja jam 0.0561

2. Mandor jam 0.0080

B. BAHAN

1. Aggrgat A M3 1.1864

C. PERALATAN

1. Motor Grader jam 0.0039

2. Tandem Roller jam 0.0357

3. Water Tanker jam 0.0141

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 174: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LPS. POND. AGG. KLS. A ( MANUAL )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja jam 0.5000

2. Mandor jam 0.0167

B. BAHAN

1. Aggrgat A M3

1.1864

C. PERALATAN

1. Tandem Roller jam 0.0357

2. Water Tanker jam 0.0141

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 175: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LPS. POND. AGREGAT. KLS. B ( ALAT )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja jam 0.0561

2. Mandor jam 0.0080

B. BAHAN

1. Aggregat B M3

1.1864

C. PERALATAN

1. Motor Grader jam 0.0039

2. Tandem Roller jam 0.0357

3. Water Tanker jam 0.0141

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

HARGA SATUAN PEKERJAAN

ANALISA

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 176: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LPS. POND. AGREGAT. KLS. B ( MANUAL )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja jam 0.5000

2. Mandor jam 0.0167

B. BAHAN

1. Aggregat B M3

1.1864

C. PERALATAN

1. Tandem Roller jam 0.0357

2. Water Tanker jam 0.0141

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

F. HARGA SATUAN PEKERJAAN ( D + E ) #REF!

Analisa EI-422

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Page 177: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI BAWAH KONSTRUKSI TELFORD ( MANUAL )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 0.1071

2. Mandor Jam 0.0268

B. BAHAN

1. Batu kali 15 - 20 cm M3

0.1302

Batu kali 5 - 7 cm M3

1.0290

Pasir urug M3

0.4561

C. PERALATAN

1. Tandem Roller 6 - 8 Ton Jam 0.0268

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 178: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI BAWAH KONSTRUKSI BATU KAPUR ( MANUAL )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 0.1428

2. Mandor Jam 0.0357

B. BAHAN

1. Batu kapur M3

1.1000

C. PERALATAN

1. Tandem Roller 6 - 8 Ton Jam 0.0357

2. Water Tanker Jam 0.1250

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Page 179: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Lapis Pondasi Agregat Dengan Cement Treated Base (CTB) Manual

SATUAN PEMBAYARAN : m³

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Jam 0.7500

2. Mandor Jam 0.0167

B. BAHAN

1. Agregat Pecah Tersaring M3

1.4458

(Base Coarse A)

2. Semen Kg 181.5000

3 Alat Bantu Ls 0.2000

C. PERALATAN

1. Tandem Roller Jam 0.0357

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

Page 180: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS RESAP PENGIKAT (PRIME COAT)

SATUAN PEMBAYARAN : Liter

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0021 0.00 0.00

2. Mandor (L03) Jam 0.0004 0.00 0.00

0.00

B. BAHAN

1. Aspal M49 Kg 0.6790 0.00 0.00

2. Kerosene M55 liter 0.3708 0.00 0.00

0.00

C. PERALATAN

1. Asphalt Distributor E41 Jam 0.0002 0.00 0.00

2. Compressor E05 Jam 0.0002 0.00 0.00

0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00

E. OVERHEAD & PROFIT 10.0 % x D 0.00F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

Page 181: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PEREKAT (TACK COAT)

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0017

2. Mandor (L03) Jam 0.0003

B. BAHAN

1. Aspal M49 Kg 0.6790

2. Kerosene M55 liter 0.1648

C. PERALATAN

1. Asphalt Distributor E41 Jam 0.0002

2. Compressor E05 Jam 0.0002

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Page 182: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS TIPIS ASPAL BETON ( LATASTON/HRS ) - ( ALAT )

SATUAN PEMBAYARAN : Ton

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2008

2. Mandor (L03) Jam 0.0201

B. BAHAN

1. Lataston ( HRS ) M53 Ton 1.0500

C. PERALATAN

1. Asphalt Finisher E02 Jam 0.0191

2. Tandem Roller E17 Jam 0.0406

3. P. Tyre Roller E18 Jam 0.0126

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 183: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS ASPAL BETON ( LASTON /AC ) - ( ALAT )

SATUAN PEMBAYARAN : Ton

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2008

2. Mandor (L03) Jam 0.0201

B. BAHAN

1. Laston ( AC ) M52 Ton 1.0500

C. PERALATAN

1. Asp. Finisher E02 Jam 0.0142

2. Tandem Roller E17 Jam 0.0362

3. P. Tyre Roller E18 Jam 0.0108

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

Page 184: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : ASPHALT TREADE BASE ( ATB ) - ( ALAT )

SATUAN PEMBAYARAN : Ton

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2008

2. Mandor (L03) Jam 0.0201

B. BAHAN

1. ATB M51 Ton 1.0500

C. PERALATAN

1. Asphalt Finisher E02 Jam 0.0111

2. Tandem Roller E17 Jam 0.0283

3. P. Tyre Roller E18 Jam 0.0084

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

0

ANALISA

HARGA SATUAN PEKERJAAN

Page 185: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PERMUKAAN PENETRASI MACADAM ( t = 7 cm )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1417

2. Mandor (L03) Jam 0.0142

B. BAHAN

1. Agregat Kasar M13 M3 1.6690

2. Agregat Halus M14 M3 0.1479

3 Aspal M49 Kg 98.5857

C. PERALATAN

1. 3-Wheel Roller E16 Jam 0.0435

2. Asp. Sprayer E03 Jam 0.0004

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA BAHAN

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA PERALATAN

Page 186: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI PERATA PENETRASI MACADAM

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1417

2. Mandor (L03) Jam 0.0142

B. BAHAN

1. Agregat Kasar M13 M3 1.7746

2. Agregat Pengunci M23 M3 0.2465

3 Aspal M49 Kg 103.0000

C. PERALATAN

1. 3-Wheel Roller E16 Jam 0.0406

2. Asp. Sprayer E03 Jam 0.0004

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA PERALATAN

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Page 187: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS TIPIS ASPAL BETON ( LATASTON/HRS ) - ( ALAT )

SATUAN PEMBAYARAN : Ton

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 1.8072

2. Mandor (L03) Jam 0.0201

B. BAHAN

1. Lataston ( HRS ) M53 Ton 1.0500

C. PERALATAN

1. Tandem Roller E17 Jam 0.0406

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

Analisa EI-542

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 188: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS ASPAL BETON ( LASTON /AC ) - ( MANUAL )

SATUAN PEMBAYARAN : Ton

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 1.8072

2. Mandor (L03) Jam 0.0201

B. BAHAN

1. Laston ( AC ) M52 Ton 1.0500

C. PERALATAN

1. Tandem Roller E17 Jam 0.0362

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

HARGA SATUAN PEKERJAAN

ANALISA

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 189: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : ASPHALT TREADE BASE ( ATB ) - ( MANUAL )

SATUAN PEMBAYARAN : Ton

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 1.8072

2. Mandor (L03) Jam 0.0201

B. BAHAN

1. Asphalt Trade Base ( ATB ) M51 Ton 1.0500

C. PERALATAN

1. Tandem Roller E17 Jam 0.0362

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-544

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Page 190: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR READY MIX K-500

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.1239

2. Tukang (L02) jam 0.0620

3. Mandor (L03) jam 0.0155

B. BAHAN

1. Beton Ready Mix K-500 M47 M3

1.0800

C. PERALATAN

1. Concrete Vibrator E20 jam 0.1004

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-611

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 191: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR READY MIX K-400

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.8032

2. Tukang (L02) jam 0.4016

3. Mandor (L03) jam 0.1004

B. BAHAN

1. Beton Ready Mix K-400 M46 M3

1.0800

C. PERALATAN

1. Concrete Vibrator E20 jam 0.1004

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

Analisa EI-612

ANALISA

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 192: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR READY MIX K-350

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.8032

2. Tukang (L02) jam 0.4016

3. Mandor (L03) jam 0.1004

B. BAHAN

1. Beton Ready Mix K-350 M45 M3

1.0800

C. PERALATAN

1. Concrete Vibrator E20 jam 0.1004

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 193: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR READY MIX K-300

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.8032

2. Tukang (L02) jam 0.4016

3. Mandor (L03) jam 0.1004

B. BAHAN

1. Beton Ready Mix K-300 M44 M3

1.0800

C. PERALATAN

1. Concrete Vibrator E20 jam 0.1004

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Analisa EI-614

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA PERALATAN

Page 194: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR READY MIX K-225

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 4.0161

2. Tukang (L02) jam 2.2949

3. Mandor (L03) jam 0.5737

B. BAHAN

1. Beton Ready Mix K-225 M43 M3

1.0800

C. PERALATAN

1. Concrete Vibrator E20 jam 0.1004

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-615

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

Page 195: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR K-225 ( SITE MIX )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 3.0120

2. Tukang (L02) jam 2.0080

3. Mandor (L03) jam 0.5020

B. BAHAN

1. Semen M25 Zak 7.1894

2. Pasir beton M01b M3

0.3917

3. Agregat Kasar M13 M3

0.5453

C. PERALATAN

1. Conc. Mixer E06 jam 0.5020

2. Water Tanker E23 jam 0.0541

3. Concrete Vibrator E20 jam 0.5020

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-616 BS

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

Page 196: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR SITE MIX K-175

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 5.4618

2. Tukang (L02) jam 2.7309

3. Mandor (L03) jam 0.6827

B. BAHAN

1. Semen M25 Zak 6.2624

2. Pasir beton M01b M3 0.4418

3. Agregat Kasar M13 M3 0.5318

C. PERALATAN

1. Conc. Mixer E06 jam 0.6827

2. Water Tanker E23 jam 0.0538

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-617

ANALISA

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

Page 197: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON SIKLOP STRUKTUR SITE MIX K-175

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 8.1928

2. Tukang (L02) jam 0.6827

3. Mandor (L03) jam 0.6827

B. BAHAN

1. Semen M25 Zak 4.5856

2. Pasir beton M01b M3 0.3517

3. Agregat Kasar M13 M3 0.6337

4. Batu Belah M06 M3 0.6518

C. PERALATAN

1. Conc. Mixer E47 jam 0.6827

2. Water Tanker E23 jam 0.0394

3. Con. Vibrator E20 jam 0.6827

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-618

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

Page 198: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR SITE MIX K-125

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 1.3655

2. Tukang (L02) jam 0.6827

3. Mandor (L03) jam 0.6827

B. BAHAN

1. Semen M25 Zak 5.2324

2. Pasir beton M01b M3 0.4967

3. Agregat Kasar M13 M3 0.5190

C. PERALATAN

1. Conc. Mixer E06 jam 0.6827

2. Water Tanker E23 jam 0.0473

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-619

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Page 199: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PEMBESIAN BAJA TULANGAN

SATUAN PEMBAYARAN : Kg

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 0.1050

2. Tukang (L02) jam 0.0350

3. Mandor (L03) jam 0.0350

B. BAHAN

1. Baja Tulangan (Polos) U24 M31a Kg 1.1000

2. Kawat Beton M28 Kg 0.0025

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-621

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 200: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BEKISTING UNTUK BETON STRUKTUR (JEMBATAN)

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 4.9000

2. Tukang (L02) jam 1.4000

3. Mandor (L03) jam 0.3500

B. BAHAN

1. Kayu Acuan M40 M3

0.0330

2. Multipleks 120 x 240 x 0.90 cm M39.b Lbr 0.3850

3 Paku Jembatan M30 Kg 0.2200

C. PERALATAN

1. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

Analisa EI-67

ANALISA

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 201: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BEKISTING UNTUK BETON STRUKTUR SALURAN

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 1.7500

2. Tukang (L02) jam 0.7000

3. Mandor (L03) jam 0.3500

B. BAHAN

1. Kayu Acuan M40 M3

0.0154

2. Tripleks M39.c Lbr 0.3726

3 Paku M30 Kg 0.1467

C. PERALATAN

1. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

Analisa EI-671

ANALISA

HARGA SATUAN PEKERJAAN

Page 202: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PONDASI CERUCUK, PENYEDIAAN DAN PEMANCANGAN

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 1.0000

2. Tukang (L02) jam 0.5000

3. Mandor (L03) jam 0.2500

B. BAHAN

1. Dolken Ø 8-10 cm ; P = 4 m M38.a btg 0.2500

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-661

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

Page 203: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : DINDING TURAP BAJA

SATUAN PEMBAYARAN : Kg

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0051

2. Tukang (L02) jam 0.0063

3. Mandor (L03) jam 0.0006

B. BAHAN

1. Baja Struktur M34 Kg 1.0500

2. Kawat Las M32 Dos 0.1200

C. PERALATAN

1. Crane E07 jam 0.0003

2. Welding Set E32 jam 0.0028

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-665

ANALISA

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

Page 204: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BRONJONG

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 7.0000

2. Tukang (L02) jam 1.7500

3. Mandor (L03) jam 0.8750

B. BAHAN

1. Kawat Bronjong Pabrikasi M121 Kg 1.0000

2. Batu M02 M3

1.2000

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-6102

ANALISA

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

Page 205: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BRONJONG (DENGAN ANGKUTAN)

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 8.7500

2. Tukang (L02) jam 1.7500

3. Mandor (L03) jam 0.8750

B. BAHAN

1. Kawat Bronjong Pabrikasi M121 Kg 1.0000

2. Batu M02 M3

1.2000

C. PERALATAN

1. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-6103

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 206: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PEMBONGKARAN BETON ( MANUAL )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 31.2500

2. Mandor (L03) Jam 1.5625

B. BAHAN

C. PERALATAN

1. Dump Truck E08 Jam 1.7474

2. Alat bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

Analisa EI-616 PB

ANALISA

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 207: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BORE PILE BETON, Dia. 300 mm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 4.3507

2. Tukang (L02) jam 1.7403

3. Mandor (L03) jam 0.8701

B. BAHAN

1. Beton K-225 M43 M3

0.0707

2. Baja Tulangan M31a Kg 8.1289

3. Casing M113 M2

0.9425

C. PERALATAN

1. Mini Bore Pile Machine E55 jam 0.8701

2. Concr. Pump E28 jam 0.0080

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-6618

ANALISA

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

Page 208: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BORE PILE BETON, Dia. 400 mm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 4.3507

2. Tukang (L02) jam 1.7403

3. Mandor (L03) jam 0.8701

B. BAHAN

1. Beton K-225 M43 M3

0.1257

2. Baja Tulangan M31a Kg 14.4513

3. Casing M113 M2

1.2566

C. PERALATAN

1. Mini Bore Pile Machine E55 jam 0.8701

2. Concr. Pump E28 jam 0.0142

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-6619

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

Page 209: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BORE PILE BETON, Dia. 500 mm

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 4.3507

2. Tukang (L02) jam 1.7403

3. Mandor (L03) jam 0.8701

B. BAHAN

1. Beton K-225 M43 M3

0.1963

2. Baja Tulangan M31a Kg 22.5802

3. Casing M113 M2

1.5708

C. PERALATAN

1. Mini Bore Pile Machine E55 jam 0.8701

2. Concr. Pump E28 jam 0.0222

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-6620

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Page 210: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PEMANCANGAN SHEET PILE

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.5600

2. Tukang (L02) Jam 0.1400

3. Mandor (L03) Jam 0.1400

4. Operator (L04) Jam 0.2800

5. Pembantu Operator (L05) Jam 0.2800

B. BAHAN

C. PERALATAN

1. Crane 10-15 ton E07 Jam 0.1616

2. Pile Driver + Hammer E30.a Jam 0.1754

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-63

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

Page 211: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-325-A-1000 P : 8-13, K-700

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.4000

2. Tukang (L02) Jam 0.1000

3. Mandor (L03) Jam 0.1000

B. BAHAN

1. Sheet Pile W-325-A-1000, M140.a m' 1.0000

P : 8-13, K-700

C. PERALATAN

1. Flat Bed Truck E11 Jam 0.2263

2. Crane 10-15 ton E07 Jam 0.1870

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-641.a

ANALISA

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

Page 212: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-325-B-1000 P : 8-14, K-700

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.4000

2. Tukang (L02) Jam 0.1000

3. Mandor (L03) Jam 0.1000

B. BAHAN

1. Sheet Pile W-325-B-1000, M140.b m' 1.0000

P : 8-14, K-700

C. PERALATAN

1. Flat Bed Truck E11 Jam 0.2263

2. Crane 10-15 ton E07 Jam 0.1870

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-641.b

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

Page 213: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-350-A-1000 P : 9-15, K-700

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.4000

2. Tukang (L02) Jam 0.1000

3. Mandor (L03) Jam 0.1000

B. BAHAN

1. Sheet Pile W-350-A-1000, M141.a m' 1.0000

P : 9-15, K-700

C. PERALATAN

1. Flat Bed Truck E11 Jam 0.2263

2. Crane 10-15 ton E07 Jam 0.1870

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-641.c

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Page 214: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-350-B-1000 P : 10-15, K-700

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.4000

2. Tukang (L02) Jam 0.1000

3. Mandor (L03) Jam 0.1000

B. BAHAN

1. Sheet Pile W-350-B-1000, M141.b m' 1.0000

P : 10-15, K-700

C. PERALATAN

1. Flat Bed Truck E11 Jam 0.2263

2. Crane 10-15 ton E07 Jam 0.1870

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-641.d

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 215: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-400-A-1000 P : 10-16, K-700

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.4000

2. Tukang (L02) Jam 0.1000

3. Mandor (L03) Jam 0.1000

B. BAHAN

1. Sheet Pile W-400-A-1000, M142.a m' 1.0000

P : 10-16, K-700

C. PERALATAN

1. Flat Bed Truck E11 Jam 0.2263

2. Crane 10-15 ton E07 Jam 0.1870

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 216: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-400-B-1000 P : 11-16, K-700

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.4000

2. Tukang (L02) Jam 0.1000

3. Mandor (L03) Jam 0.1000

B. BAHAN

1. Sheet Pile W-400-B-1000, M142.b m' 1.0000

P : 11-16, K-700

C. PERALATAN

1. Flat Bed Truck E11 Jam 0.2263

2. Crane 10-15 ton E07 Jam 0.1870

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

Analisa EI-641.f

ANALISA

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 217: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-450-A-1000 P : 11-17, K-700

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.4000

2. Tukang (L02) Jam 0.1000

3. Mandor (L03) Jam 0.1000

B. BAHAN

1. Sheet Pile W-450-A-1000 M143.a m' 1.0000

P : 11-17, K-700

C. PERALATAN

1. Flat Bed Truck E11 Jam 0.2263

2. Crane 10-15 ton E07 Jam 0.1870

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

Analisa EI-641.g

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 218: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-450-B-1000 P : 12-17, K-700

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.4000

2. Tukang (L02) Jam 0.1000

3. Mandor (L03) Jam 0.1000

B. BAHAN

1. Sheet Pile W-450-B-1000 M143.b m' 1.0000

P : 12-17, K-700

C. PERALATAN

1. Flat Bed Truck E11 Jam 0.2263

2. Crane 10-15 ton E07 Jam 0.1870

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Analisa EI-641.h

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA PERALATAN

Page 219: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN FLAT SHEET PILE, K-700

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.4000

2. Tukang (L02) Jam 0.1000

3. Mandor (L03) Jam 0.1000

B. BAHAN

1. Flat Sheet Pile, K-700 M143.c m' 1.0000

C. PERALATAN

1. Flat Bed Truck E11 Jam 0.2263

2. Crane 10-15 ton E07 Jam 0.1870

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-642

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

Page 220: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PEMANCANGAN TIANG PANCANG

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.5600

2. Tukang (L02) Jam 0.2800

3. Mandor (L03) Jam 0.1400

4. Operator (L04) Jam 0.2800

5. Pembantu Operator (L05) Jam 0.2800

B. BAHAN

C. PERALATAN

1. Crane 10-15 ton E07 Jam 0.1616

2. Pile Driver + Hammer E30.a Jam 0.1754

3. Welding Set E32 Jam 0.1852

4. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

KOMPONEN HARGA

Analisa EI-65

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 221: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Penyediaan Tiang Pancang Type A2-300 - 6 s/d 8, Segmen Bottom

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.4000

2. Tukang (L02) Jam 0.1000

3. Mandor (L03) Jam 0.1000

B. BAHAN

1. Tiang Pancang Type A2 - 300 - M144.a m' 1.0000

6 s/d 8, Segmen Bottom

C. PERALATAN

1. Flat Bed Truck E11 Jam 0.2263

2. Crane 10-15 ton E07 Jam 0.1870

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

Analisa EI-651.a

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 222: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Penyediaan Tiang Pancang Type A2-300 - 6 s/d 8, Segmen Bottom Pencil

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.4000

2. Tukang (L02) Jam 0.1000

3. Mandor (L03) Jam 0.1000

B. BAHAN

1. Tiang Pancang Type A2 - 300 - M144.b m' 1.0000

6 s/d 8, Segmen Bottom Pencil

C. PERALATAN

1. Flat Bed Truck E11 Jam 0.2263

2. Crane 10-15 ton E07 Jam 0.1870

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA TENAGA

Analisa EI-651.b

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 223: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Penyediaan Tiang Pancang Type A2-300 - 6 s/d 8, Segmen Middle

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.4000

2. Tukang (L02) Jam 0.1000

3. Mandor (L03) Jam 0.1000

B. BAHAN

1. Tiang Pancang Type A2 - 300 - M144.c m' 1.0000

6 s/d 8, Segmen Middle

C. PERALATAN

1. Flat Bed Truck E11 Jam 0.2263

2. Crane 10-15 ton E07 Jam 0.1870

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA BAHAN

Analisa EI-651.c

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA PERALATAN

Page 224: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Penyediaan Tiang Pancang Type A2-400 - 6 s/d 8, Segmen Bottom

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.4000

2. Tukang (L02) Jam 0.1000

3. Mandor (L03) Jam 0.1000

B. BAHAN

1. Tiang Pancang Type A2 - 400 - M145.a m' 1.0000

6 s/d 8, Segmen Bottom

C. PERALATAN

1. Flat Bed Truck E11 Jam 0.2263

2. Crane 10-15 ton E07 Jam 0.1870

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA PERALATAN

Analisa EI-651.d

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Page 225: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Penyediaan Tiang Pancang Type A2-400 - 6 s/d 8, Segmen Bottom Pencil

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.4000

2. Tukang (L02) Jam 0.1000

3. Mandor (L03) Jam 0.1000

B. BAHAN

1. Tiang Pancang Type A2 - 400 - M145.b m' 1.0000

6 s/d 8, Segmen Bottom Pencil

C. PERALATAN

1. Flat Bed Truck E11 Jam 0.2263

2. Crane 10-15 ton E07 Jam 0.1870

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-651.e

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 226: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Penyediaan Tiang Pancang Type A2-400 - 6 s/d 8, Segmen Middle

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.4000

2. Tukang (L02) Jam 0.1000

3. Mandor (L03) Jam 0.1000

B. BAHAN

1. Tiang Pancang Type A2 - 400 - M145.c m' 1.0000

6 s/d 8, Segmen Middle

C. PERALATAN

1. Flat Bed Truck E11 Jam 0.2263

2. Crane 10-15 ton E07 Jam 0.1870

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

ANALISA

Analisa EI-651.f

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

Page 227: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANG ELASTOMERIK; BEARING PAD 35 X 40 X 3,9

SATUAN PEMBAYARAN : BUAH

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 2.2200

2. Mandor (L03) Jam 0.5550

B. BAHAN

1. Bearing Pad Elastomer M162 Buah 1.0000

Uk. 350 x 400 x 39

2. Non Shrinkage Mortar M159 Kg 28.8000

2. Baja Anyaman M156 Kg 1.0000

2. Epoxy Adhesive M161 Liter 0.2500

C. PERALATAN

1. Alat Bantu E07 Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-681

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 228: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANG PIPA AIR 3" (DECK DRAIN)

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 1.4000

2. Tukang (L02) Jam 0.7000

3. Mandor (L03) Jam 0.3500

B. BAHAN

1. Pipa PVC D. 3" M60.a m' 1.0000

2. Mur Baut M154 Kg -

3. Besi Plat Strip M155 Kg -

4. Section Steel M157 Kg -

5. Fitting & Support / Reducer M158 Buah 0.3000

C. PERALATAN

1. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

Analisa EI-682

ANALISA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 229: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : EXPANSION JOINT

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 2.2200

2. Mandor (L03) Jam 0.5550

B. BAHAN

1. Expansion Joint Type Asphaltic Plug M163 m' 1.0000

C. PERALATAN

1. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

KOMPONEN HARGA

(Rp.)

Analisa EI-683

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 230: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : MARKA TERMOPLASTIK (ALAT)

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.0035

2. Tukang (L02) Jam 0.0009

3. Mandor (L03) Jam 0.0004

B. BAHAN

1. Cat Thermoplastic Marka Jalan M99 Kg 0.0230

2. Cat Marka, Glass Beads (Drop On) M103 Kg 0.0193

3. Epoxy Premarking M160 Liter 0.0083

C. PERALATAN

1. Compressor 4000-6500 L/M E05 Jam 0.0193

2. Line Marker Truck E57 Jam 2.2991

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

Analisa EI-684

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 231: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAUNCHING PCI GIRDER

SATUAN PEMBAYARAN : BUAH

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 54.0000

2. Tukang (L02) Jam 27.0000

3. Mandor (L03) Jam 9.0000

4. Operator (L04) Jam 18.0000

B. BAHAN

C. PERALATAN

1. Crane 10-15 ton E07 Jam 3.0000

2. Crane 120 Ton E56 Jam 6.0000

3. Alat Bantu E58 Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Analisa EI-6851

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

JUMLAH HARGA PERALATAN

Page 232: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAUNCHING PCI GIRDER

SATUAN PEMBAYARAN : BUAH

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 54.0000

2. Tukang (L02) Jam 27.0000

3. Mandor (L03) Jam 9.0000

4. Tukang Besi / Las (L02) Jam 27.0000

B. BAHAN

1. Kawat Las M32 Kg 3.6667

C. PERALATAN

1. Launching Girder E62 Jam 3.0000

2. Crane 10-15 ton E07 Jam 3.0000

3. Flat Bed Truck w/ Crane 4 Ton E58 Jam 3.0000

4. Single Cage Elevator (Hoist) E61 Jam 1.5000

5. Traveller Beam Set E59 Jam 6.0000

6. Generator Set E12 Jam 6.0000

7. Crane 120 Ton E56 Jam 6.0000

8. Welding Set E32 Jam 1.5000

9. Hydraulic Jack 150 Ton E60 Jam 6.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-6852

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

Page 233: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BALOK I GIRDER K-600; L = 20,6 M

SATUAN PEMBAYARAN : BUAH

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

B. BAHAN

1. Girder Type I, 20,6 m M164 Buah 1.0000

H = 70 cm

C. PERALATAN

1. Launching PCI Girder EI-6851 Buah 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-6861.a

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 234: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BALOK I GIRDER K-800; L = 45,7 M

SATUAN PEMBAYARAN : BUAH

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

B. BAHAN

1. Girder Type I, 45,7 m M165 Buah 1.0000

H = 240 cm

C. PERALATAN

1. Launching PCI Girder EI-6852 Buah 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-6862.a

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

Page 235: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN JALAN BETON K-350

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 2.0080

2. Tukang (L02) jam 1.0040

3. Mandor (L03) jam 0.1004

B. BAHAN

1. Beton Ready Mix K-350 M45 M3

1.0800

2. Karung M114 Bh 5.0000

3. Curing Ltr 84.0000

C. PERALATAN

1 Con. Vibrator E20 jam (0.1437)

2 Con. Cutter E54 jam (0.1437)

3 Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

G. HARGA SATUAN PEKERJAAN / M3

Analisa EI-711

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 236: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN JALAN BETON K-350 ( DENGAN ANGKUTAN )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 2.1084

2. Tukang (L02) jam 1.0040

3. Mandor (L03) jam 0.1004

B. BAHAN

1. Beton Ready Mix K-350 M45 M3

1.0800

2. Karung Bh 5.0000

3. Curing Ltr 84.0000

C. PERALATAN

1. Con. Vibrator E20 jam 0.3333

2. Con. Cutter E54 jam 0.3333

3. Truck Pick Up E53 jam 0.5972

4. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

G. HARGA SATUAN PEKERJAAN / M3

ANALISA

Analisa EI-712

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 237: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN JALAN BETON READY MIX K-225

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 2.0080

2. Tukang (L02) jam 1.0040

3. Mandor (L03) jam 0.1004

B. BAHAN

1. Beton Ready Mix K-225 M43 M3

1.0800

2. Karung Bh 5.0000

3. Curing Ltr 84.0000

C. PERALATAN

1 Con. Vibrator E20 jam (0.1437)

2 Con. Cutter E54 jam (0.1437)

3 Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

G. HARGA SATUAN PEKERJAAN / M3

HARGA SATUAN PEKERJAAN

Analisa EI-713

ANALISA

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 238: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN JALAN BETON READY MIX K-225 ( DENGAN ANGKUTAN )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 2.1084

2. Tukang (L02) jam 1.0040

3. Mandor (L03) jam 0.1004

B. BAHAN

1. Beton Ready Mix K-225 M43 M3

1.0800

2. Karung Bh 5.0000

3. Curing Ltr 84.0000

C. PERALATAN

1 Con. Vibrator E20 jam 0.3333

2 Con. Cutter E54 jam 0.3333

3. Truck Pick Up E53 jam 0.5972

4. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

G. HARGA SATUAN PEKERJAAN / M3

Analisa EI-714

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 239: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN JALAN BETON K-225 ( SITE MIX )

SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) jam 4.5181

2. Tukang (L02) jam 2.0080

3. Mandor (L03) jam 0.5020

B. BAHAN

1. Semen M25 Zak 7.1545

2. Pasir beton M01b M3

0.3824

3. Agregat Kasar M13 M3

0.5323

4. Karung Bh 5.0000

5. Curing Ltr 84.0000

C. PERALATAN

1. Conc. Mixer E47 jam 0.5020 0.00

2. Water Tanker E23 jam 0.0539 0.00

3. Con. Vibrator E20 jam 0.5020 0.00

4. Con. Cutter E54 jam 0.5020 0.00

5 Alat Bantu Ls 1.0000 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

G. HARGA SATUAN PEKERJAAN / M3

JUMLAH

Analisa EI-715

ANALISA

HARGA SATUAN PEKERJAAN

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 240: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : ACUAN PERKERASAN BETON

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 2.8000

2. Tukang (L02) Jam 1.4000

3. Mandor (L03) Jam 0.3500

B. BAHAN

1. Kayu Acuan M40 M3

0.0133

2. Multipleks 9 mm M39.b Lbr 0.3726

3. Paku M30 Kg 0.2200

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

HARGA

Analisa EI-72

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 241: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN PLASTIC SHEET

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0252

2. Mandor (L03) Jam 0.0126

B. BAHAN

1. Plastik Sheet M115 M2

1.0500

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA TENAGA

Analisa EI-73

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 242: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : JOINT SEALENT

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. KOMPONEN SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0405

2. Mandor (L03) Jam 0.0203

B. BAHAN

1. Sealent M91 Kg 0.2661

C. PERALATAN

1. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA PERALATAN

Analisa EI-74

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Page 243: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PEMOTONGAN POHON KERAS

SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01.a) Jam 3.5000

2. Mandor (L03) Jam 0.8750

B. BAHAN

C. PERALATAN

1. Truck Pick Up E53 Jam 1.8554

2. Chainsaw Jam 0.8750

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-823.a

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

Page 244: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PEMOTONGAN POHON LUNAK

SATUAN PEMBAYARAN : Buah

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.5600

2. Mandor (L03) Jam 0.2800

B. BAHAN

C. PERALATAN

1. Parang Jam 0.2800

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

Analisa EI-823.b

ANALISA

Page 245: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENGUPASAN DAN PEMBERSIHAN SEMAK

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.2800

2. Mandor (L03) Jam 0.1400

B. BAHAN

C. PERALATAN

1 Mesin Potong Rumput Jam 0.1400

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

Analisa EI-824

ANALISA

HARGA SATUAN PEKERJAAN

Page 246: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENGUPASAN DAN PEMBERSIHAN GULMAN

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.7000

2. Mandor (L03) Jam 0.1400

B. BAHAN

C. PERALATAN

1 Alat Bantu Ls 0.3500

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Analisa EI-824.b

ANALISA

HARGA SATUAN PEKERJAAN

Page 247: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : STABILISASI DENGAN TANAMAN

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) jam 0.2800

2. Tukang (L02) jam 0.1400

3. Mandor (L03) jam 0.0700

B. BAHAN

1. Gebalan Rumput M107 M2

1.1000

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-831

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

Page 248: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : MARKA JALAN TERMOPLASTIK (MANUAL)

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.6000

2. Tukang (L02) Jam 0.2250

3. Mandor (L03) Jam 0.0750

B. BAHAN

1. Cat Marka M99 Kg 1.9500

2. Thinner M102 Liter 1.0500

3. Glass Beads M103 Kg 0.4500

C. PERALATAN

1. Compressor E05 Jam 0.0750

2. Dump Truck E08 Jam 0.0750

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-841

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 249: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : MARKA JALAN BUKAN TERMOPLASTIK (MANUAL)

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.6000

2. Tukang (L02) Jam 0.2250

3. Mandor (L03) Jam 0.0750

B. BAHAN

1. Cat Marka M98 Kg 1.9500

2. Thinner M102 Liter 1.0500

3. Glass Beads M103 Kg 0.4500

C. PERALATAN

1. Compressor E05 Jam 0.0750

2. Dump Truck E08 Jam 0.0750

3. Alat Bantu Ls 1.0000

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

Analisa EI-842

ANALISA

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 250: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN KANSTEEN 15.25.40

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.2800

2. Tukang (L02) Jam 0.1400

3. Mandor (L03) Jam 0.0700

B. BAHAN

1. Kansteen uk. 15 x 25 x 40 M109.a Bh 2.5000

2. Semen M25 Zak 0.0060

3. Pasir Urug M01a M3

0.0014

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

Analisa EI-8410.a

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 251: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN KANSTEEN 13.20.40

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.2800

2. Tukang (L02) Jam 0.1400

3. Mandor (L03) Jam 0.0700

B. BAHAN

1. Kansteen uk. 13 x 20 x 40 M109.b Bh 2.5000

2. Semen M25 Zak 0.0060

3. Pasir Urug M01a M3

0.0014

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Analisa EI-8410.b

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA PERALATAN

Page 252: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN KANSTEEN 15.28.40

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.2800

2. Tukang (L02) Jam 0.1400

3. Mandor (L03) Jam 0.0700

B. BAHAN

1. Kansteen uk. 15 x 28 x 40 M109.c Bh 2.5000

2. Semen M25 Zak 0.0060

3. Pasir Urug M01a M3

0.0014

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-8410.c

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

Page 253: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN KANSTEEN 20.25.60

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.2800

2. Tukang (L02) Jam 0.1400

3. Mandor (L03) Jam 0.0700

B. BAHAN

1. Kansteen uk. 20 x 25 x 60 M109.d Bh 1.6667

2. Semen M25 Zak 0.0060

3. Pasir Urug M01a M3

0.0014

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Analisa EI-8410.d

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

Page 254: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN KANSTEEN 30.25.60

SATUAN PEMBAYARAN : M'

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.2800

2. Tukang (L02) Jam 0.1400

3. Mandor (L03) Jam 0.0700

B. BAHAN

1. Kansteen uk. 30 x 25 x 60 M109.e Bh 1.6667

2. Semen M25 Zak 0.0060

3. Pasir Urug M01a M3

0.0014

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-8410.e

ANALISA

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

Page 255: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN PAVING BLOK (PEDESTRIAN)

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.361

2. Tukang (L02) Jam 0.080

3. Mandor (L03) Jam 0.020

B. BAHAN

1. Paving Blok M110 M2

1.050

2. Pasir Beton M01b M3

0.053

C. PERALATAN

1. Tamper E25 Jam 0.012

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-8412.1

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

Page 256: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN PAVING BLOK, t = 8 cm (JALAN)

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.361

2. Tukang (L02) Jam 0.080

3. Mandor (L03) Jam 0.020

B. BAHAN

1. Paving Blok M110.b M2

1.050

2. Pasir Beton M01b M3

0.053

C. PERALATAN

1. Tamper E25 Jam 0.012

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-8412.2a

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH HARGA PERALATAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

Page 257: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN PAVING BLOK, t = 6 cm (JALAN)

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.361

2. Tukang (L02) Jam 0.080

3. Mandor (L03) Jam 0.020

B. BAHAN

1. Paving Blok M110.c M2

1.050

2. Pasir Beton M01b M3

0.053

C. PERALATAN

1. Tamper E25 Jam 0.012

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-8412.2b

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 258: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BONGKAR DAN PEMASANGAN KEMBALI PAVING BLOK

SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA

NO. SATUAN KUANTITAS SATUAN

(Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.361

2. Tukang (L02) Jam 0.080

3. Mandor (L03) Jam 0.020

B. BAHAN

1. Pasir Beton M01b M3

0.053

C. PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )

E. OVERHEAD & PROFIT 10.0 % x D

F. HARGA SATUAN PEKERJAAN ( D + E )

Analisa EI-8413

ANALISA

HARGA SATUAN PEKERJAAN

JUMLAH

KOMPONEN HARGA

(Rp.)

JUMLAH HARGA TENAGA

JUMLAH HARGA BAHAN

JUMLAH HARGA PERALATAN

Page 259: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN UNTUK DRAINASE , SALURAN DAN SALURAN AIR ( ALAT )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

U R A I A N

Page 260: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN UNTUK DRAINASE , SALURAN DAN SALURAN AIR ( ALAT )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUANU R A I A N

Page 261: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN UNTUK DRAINASE , SALURAN DAN SALURAN AIR ( MANUAL )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

U R A I A N

Page 262: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN UNTUK DRAINASE , SALURAN DAN SALURAN AIR ( MANUAL )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUANU R A I A N

Page 263: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN LUMPUR DAN PEMBUANGAN ( ALAT )

SATUAN PEMBAYARAN : M3

METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

U R A I A N

Page 264: AHS 2014 - upload OK FIX.pdf

Berlanjut ke halaman berikut

Page 265: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN LUMPUR DAN PEMBUANGAN ( ALAT )

SATUAN PEMBAYARAN : M3 METODE KERJA

Lanjutan

No. KODE KOEF. SATUANU R A I A N

Page 266: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN LUMPUR BUANG DITEMPAT ( ALAT )

SATUAN PEMBAYARAN : M3

METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

U R A I A N

Page 267: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN LUMPUR DAN PEMBUANGAN ( MANUAL )

SATUAN PEMBAYARAN : M3

METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

U R A I A N

Page 268: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN LUMPUR DAN PEMBUANGAN ( MANUAL )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUANU R A I A N

Page 269: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN LUMPUR BUANG DITEMPAT ( MANUAL)

SATUAN PEMBAYARAN : M3

METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

U R A I A N

Page 270: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN BATU KALI UNTUK SALURAN (ALAT)

SATUAN PEMBAYARAN : M3

METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 271: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN BATU KALI UNTUK SALURAN (ALAT)

SATUAN PEMBAYARAN : M3 METODE KERJA

Lanjutan

No. KODE KOEF. SATUANU R A I A N

Page 272: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN BATU KALI UNTUK SALURAN (BURUH)

SATUAN PEMBAYARAN : M3

METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 273: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN BATU KALI UNTUK SALURAN (BURUH)

SATUAN PEMBAYARAN : M3 METODE KERJA

Lanjutan

No. KODE KOEF. SATUANU R A I A N

Page 274: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN BATU KOSONG

SATUAN PEMBAYARAN : M3

METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

U R A I A N

Page 275: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton, Ø 30 cm ; P = 100 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 276: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton, Ø 30 cm ; P = 100 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 277: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton, Ø 40 cm ; P = 100 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 278: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton, Ø 40 cm ; P = 100 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUANU R A I A N

Page 279: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton, Ø 50 cm ; P = 100 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 280: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton, Ø 50 cm ; P = 100 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUANU R A I A N

Page 281: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton, Ø 60 cm ; P = 100 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 282: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton, Ø 60 cm ; P = 100 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUANU R A I A N

Page 283: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton (1/2), Ø U 30 cm ; P = 100 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 284: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton (1/2), Ø U 30 cm ; P = 100 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

Lihat perhitungan dalam ANALISA

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 285: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton (1/2), Ø U 40 cm ; P = 100 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 286: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton (1/2), Ø U 40 cm ; P = 100 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

5. ANALISA HARGA SATUAN PEKERJAAN

Lihat perhitungan dalam ANALISA

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 287: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton (1/2), Ø U 50 cm ; P = 100 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 288: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton (1/2), Ø U 50 cm ; P = 100 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

Lihat perhitungan dalam ANALISA

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 289: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton (1/2), Ø U 60 cm ; P = 100 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 290: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Buis Beton (1/2), Ø U 60 cm ; P = 100 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

2.d.

3.

4.

5.

6.

7.

U R A I A N

Page 291: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong² Precast Pipa Beton Tak Bertulang, Ø 30 cm ; P = 125 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

U R A I A N

Page 292: AHS 2014 - upload OK FIX.pdf

Berlanjut ke halaman berikut

JENIS PEKERJAAN : Gorong² Precast Pipa Beton Tak Bertulang, Ø 30 cm ; P = 125 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 293: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON TAK BERTULANG Ø 40 cm ; P = 125 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 294: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON TAK BERTULANG Ø 40 cm ; P = 125 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 295: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON TAK BERTULANG Ø 50 cm ; P = 125 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 296: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON TAK BERTULANG Ø 50 cm ; P = 125 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

5. ANALISA HARGA SATUAN PEKERJAAN

Lihat perhitungan dalam ANALISA

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 297: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON TAK BERTULANG Ø 60 cm, Panj. 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 298: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON TAK BERTULANG Ø 60 cm, Panj. 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 299: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON TAK BERTULANG Ø 80 cm, Panj. 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 300: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON TAK BERTULANG Ø 80 cm, Panj. 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 301: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON TAK BERTULANG Ø 90 cm, P = 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 302: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON TAK BERTULANG Ø 90 cm, P = 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 303: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON TAK BERTULANG Ø 100 cm, P = 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 304: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON TAK BERTULANG Ø 100 cm, P = 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 305: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 30 cm, P = 245 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 306: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 30 cm, P = 245 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 307: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 40 cm, P = 245 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 308: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 40 cm, P = 245 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 309: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 50 cm, P = 245 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 310: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 50 cm, P = 245 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 311: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 60 cm, P = 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 312: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 60 cm, P = 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 313: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 70 cm, P = 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 314: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 70 cm, P = 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

5. ANALISA HARGA SATUAN PEKERJAAN

Lihat perhitungan dalam ANALISA

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 315: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 80 cm, P = 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 316: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 80 cm, P = 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 317: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 90 cm, P = 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 318: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 90 cm, P = 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 319: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 100 cm, P = 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 320: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 100 cm, P = 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 321: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 120 cm, P = 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 322: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 120 cm, P = 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 323: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 150 cm, P = 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 324: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GORONG2 PRECAST PIPA BETON BERTULANG Ø 150 cm, P = 250 cm

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

Lihat perhitungan dalam ANALISA

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 325: AHS 2014 - upload OK FIX.pdf

Berlanjut ke halaman berikut

Page 326: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Gorong-Gorong Pipa beton tanpa tulangan diameter dalam 20 cm sampai 30 cm

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

U R A I A N

Page 327: AHS 2014 - upload OK FIX.pdf

Berlanjut ke halaman berikut

JENIS PEKERJAAN Gorong-Gorong Pipa beton tanpa tulangan diameter dalam 20 cm sampai 30 cm

SATUAN PEMBAYARAN M' METODE KERJALanjutan

No. KODE KOEF. SATUAN

2.c. ALAT BANTU

Diperlukan alat-alat bantu kecil

- Sekop = 3 buah

- Pacul = 3 buah

- Alat-alat kecil lain

3. TENAGA

Produksi Gorong-gorong / hari Qt 0.00 M'

Kebutuhan tenaga :

- Pekerja P 5.00 orang

- Tukang T 0.00 orang

- Mandor M 1.00 orang

Koefisien Tenaga / M1 :

- Pekerja = (Tk x P) : Qt (L01) #DIV/0! Jam

- Tukang = (Tk x T) : Qt (L02) #DIV/0! Jam

- Mandor = (Tk x M) : Qt (L03) #DIV/0! Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN

Lihat perhitungan dalam ANALISA

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 62,735.33 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 328: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Timbunan Porous atau Bahan Penyaring (Filter)

SATUAN PEMBAYARAN : M3

METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

U R A I A N

Page 329: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN Timbunan Porous atau Bahan Penyaring (Filter)

SATUAN PEMBAYARAN M3

No. KODE KOEF. SATUANU R A I A N

Page 330: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Timbunan Pasir

SATUAN PEMBAYARAN : M3

METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

t 0.15 M

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Lihat lampiran.

U R A I A N

Page 331: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN Timbunan Pasir

SATUAN PEMBAYARAN M3

No. KODE KOEF. SATUANU R A I A N

Page 332: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Anyaman Filter Plastik

SATUAN PEMBAYARAN : M2 METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Rp. 0.00 / M2

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M2

U R A I A N

Page 333: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah Permukaan

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 334: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Kisdam

SATUAN PEMBAYARAN : M' METODE KERJA

No. U R A I A N KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. MASA PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Page 335: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 400 x 400 HD

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 336: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 400 x 400 HD

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUANU R A I A N

Page 337: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 500 x 500 HD

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 338: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 500 x 500 HD

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 339: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 600 x 600 HD

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 340: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 600 x 600 HD

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 341: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 800 x 800 HD

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 342: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 800 x 800 HD

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUANU R A I A N

Page 343: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 1000 x 1000 HD

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

U R A I A N

Page 344: AHS 2014 - upload OK FIX.pdf
Page 345: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 1200 x 1200 HD

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 346: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 1200 x 1200 HD

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

5. ANALISA HARGA SATUAN PEKERJAAN

Lihat perhitungan dalam ANALISA

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 347: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 1400 x 1400 HD

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 348: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 1400 x 1400 HD

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

Volume pekerjaan : M'

U R A I A N

Page 349: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 1500 x 1500 HD

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 350: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BOX CULVERT BC 1500 x 1500 HD

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

5. ANALISA HARGA SATUAN PEKERJAAN

Lihat perhitungan dalam ANALISA

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 351: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 300/300

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 352: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 300/300

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUANU R A I A N

Page 353: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 400/400

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 354: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 400/400

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

5. ANALISA HARGA SATUAN PEKERJAAN

Lihat perhitungan dalam ANALISA

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 355: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 500/500

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 356: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 500/500

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

5. ANALISA HARGA SATUAN PEKERJAAN

Lihat perhitungan dalam ANALISA

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 357: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 600/600

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 358: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 600/600

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 359: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 800/800

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 360: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 800/800

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 361: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 800/1000

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 362: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 800/1000

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 363: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 800/1200

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 364: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 800/1200

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 365: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 1000/1000

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 366: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 1000/1000

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 367: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 1200/1200

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 368: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 1200/1200

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

5. ANALISA HARGA SATUAN PEKERJAAN

Lihat perhitungan dalam ANALISA

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 369: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 1400/1400

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 370: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 1400/1400

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 371: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 1600/1600

SATUAN PEMBAYARAN : M' METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

Page 372: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : U-DITCH TIPE U 1600/1600

SATUAN PEMBAYARAN : M' METODE KERJA

Lanjutan

No. KODE KOEF. SATUAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

U R A I A N

Page 373: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN TANAH BIASA DAN PEMBUANGAN ( ALAT )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

(E10)

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 374: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN TANAH BIASA DAN PEMBUANGAN ( ALAT )

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

5.

6.

7.

U R A I A N

METODE KERJA

Page 375: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN TANAH BIASA PEMBUANGAN ( MANUAL ) / PU

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 376: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN TANAH BIASA PEMBUANGAN ( MANUAL ) / PU

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 377: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN TANAH BIASA BUANG DITEMPAT ( MANUAL )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 378: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN BATU / TANAH KERAS ( MANUAL )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 379: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : GALIAN PERKERASAN BERASPAL ( MANUAL )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 380: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : TIMBUNAN TANAH SETEMPAT

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 381: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : TIMBUNAN TANAH PILIHAN

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 382: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : TIMBUNAN BADAN JALAN TANAH PILIHAN ( ALAT )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 383: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : TIMBUNAN BADAN JALAN TANAH PILIHAN ( ALAT )

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 384: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : TIMBUNAN BADAN JALAN TANAH PILIHAN ( MANUAL)

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 385: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYIAPAN BADAN JALAN ( MENGGUNAKAN ALAT )

SATUAN PEMBAYARAN : M2

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 386: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYIAPAN BADAN JALAN ( MENGGUNAKAN ALAT )

SATUAN PEMBAYARAN : M2

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 387: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYIAPAN BADAN JALAN ( MANUAL )

SATUAN PEMBAYARAN : M2

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 388: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI AGREGAT Kls. A ( ALAT )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 389: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI AGREGAT Kls. A ( ALAT )

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUANU R A I A N

METODE KERJA

Page 390: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI AGREGAT Kls. A ( MANUAL )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 391: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI AGREGAT Kls. A ( MANUAL )

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 392: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI AGREGAT Kls. B, CBR MIN 60 % ( ALAT )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 393: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI AGREGAT Kls. B, CBR MIN 60 % ( ALAT )

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 394: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI AGREGAT Kls. B, CBR MIN 60 % ( MANUAL )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 395: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI AGREGAT Kls. B, CBR MIN 60 % ( MANUAL )

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 396: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LPS. POND. AGG. KLS. A ( ALAT )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 397: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LPS. POND. AGG. KLS. A ( ALAT )

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 398: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LPS. POND. AGG. KLS. A ( MANUAL )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 399: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LPS. POND. AGG. KLS. A ( MANUAL )

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 400: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LPS. POND. AGREGAT. KLS. B ( ALAT )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 401: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LPS. POND. AGREGAT. KLS. B ( ALAT )

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 402: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LPS. POND. AGREGAT. KLS. B ( MANUAL )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 403: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LPS. POND. AGREGAT. KLS. B ( MANUAL )

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 404: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI BAWAH KONSTRUKSI TELFORD ( MANUAL )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

U R A I A N

METODE KERJA

Page 405: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI BAWAH KONSTRUKSI TELFORD ( MANUAL )

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 406: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI BAWAH KONSTRUKSI BATU KAPUR ( MANUAL )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 407: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI BAWAH KONSTRUKSI BATU KAPUR ( MANUAL )

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUANU R A I A N

METODE KERJA

Page 408: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Lapis Pondasi Agregat Dengan Cement Treated Base (CTB) Manual

SATUAN PEMBAYARAN : m³ METODE KERJA

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

U R A I A N

Page 409: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Lapis Pondasi Agregat Dengan Cement Treated Base (CTB) Manual

SATUAN PEMBAYARAN : m³ METODE KERJA

Lanjutan

No. KODE KOEF. SATUANU R A I A N

Page 410: AHS 2014 - upload OK FIX.pdf
Page 411: AHS 2014 - upload OK FIX.pdf
Page 412: AHS 2014 - upload OK FIX.pdf
Page 413: AHS 2014 - upload OK FIX.pdf
Page 414: AHS 2014 - upload OK FIX.pdf
Page 415: AHS 2014 - upload OK FIX.pdf
Page 416: AHS 2014 - upload OK FIX.pdf
Page 417: AHS 2014 - upload OK FIX.pdf
Page 418: AHS 2014 - upload OK FIX.pdf
Page 419: AHS 2014 - upload OK FIX.pdf
Page 420: AHS 2014 - upload OK FIX.pdf
Page 421: AHS 2014 - upload OK FIX.pdf
Page 422: AHS 2014 - upload OK FIX.pdf
Page 423: AHS 2014 - upload OK FIX.pdf
Page 424: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS RESAP PENGIKAT (PRIME COAT)

SATUAN PEMBAYARAN : Liter

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 425: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS RESAP PENGIKAT (PRIME COAT)

SATUAN PEMBAYARAN : Liter

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 426: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS RESAP PENGIKAT (PRIME COAT)

SATUAN PEMBAYARAN : M2

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 427: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PEREKAT (TACK COAT)

SATUAN PEMBAYARAN : Liter

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 428: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PEREKAT (TACK COAT)

SATUAN PEMBAYARAN : Liter

No. KODE KOEF. SATUANU R A I A N

METODE KERJA

Page 429: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS TIPIS ASPAL BETON ( LATASTON/HRS ) - ( ALAT )

SATUAN PEMBAYARAN : Ton

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 430: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS TIPIS ASPAL BETON ( LATASTON/HRS ) - ( ALAT )

SATUAN PEMBAYARAN : Ton

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 431: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS ASPAL BETON ( LASTON /AC ) - ( ALAT )

SATUAN PEMBAYARAN : Ton

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

U R A I A N

METODE KERJA

Page 432: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS ASPAL BETON ( LASTON /AC ) - ( ALAT )

SATUAN PEMBAYARAN : Ton

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 433: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : ASPHALT TREADE BASE ( ATB ) - ( ALAT )

SATUAN PEMBAYARAN : Ton

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA / METODE PELAKSANAAN

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 434: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : ASPHALT TREADE BASE ( ATB ) - ( ALAT )

SATUAN PEMBAYARAN : Ton

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 435: AHS 2014 - upload OK FIX.pdf

5.5 (1)

JENIS PEKERJAAN : LAPIS PERMUKAAN PENETRASI MACADAM ( t = 7 cm )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

U R A I A N

METODE KERJA

Page 436: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PERMUKAAN PENETRASI MACADAM ( t = 7 cm )

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 437: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI PERATA PENETRASI MACADAM

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 438: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS PONDASI PERATA PENETRASI MACADAM

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 439: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS TIPIS ASPAL BETON ( LATASTON/HRS ) - ( MANUAL )

SATUAN PEMBAYARAN : Ton

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 440: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS TIPIS ASPAL BETON ( LATASTON/HRS ) - ( MANUAL )

SATUAN PEMBAYARAN : Ton

Lanjutan

No. KODE KOEF. SATUAN

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 441: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS ASPAL BETON ( LASTON /AC ) - ( MANUAL )

SATUAN PEMBAYARAN : Ton

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA / METODE PELAKSANAAN

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 442: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : LAPIS ASPAL BETON ( LASTON /AC ) - ( MANUAL )

SATUAN PEMBAYARAN : Ton

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 443: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : ASPHALT TREADE BASE ( ATB ) - ( MANUAL )

SATUAN PEMBAYARAN : Ton

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA / METODE PELAKSANAAN

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke hal. berikut.

METODE KERJA

U R A I A N

Page 444: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : ASPHALT TREADE BASE ( ATB ) - ( MANUAL )

SATUAN PEMBAYARAN : Ton

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 445: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR READY MIX K-500

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 446: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR READY MIX K-500

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 447: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR READY MIX K-400

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 448: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR READY MIX K-400

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

U R A I A N

METODE KERJA

Page 449: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR READY MIX K-350

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 450: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR READY MIX K-350

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 451: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR READY MIX K-300

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 452: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR READY MIX K-300

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

U R A I A N

METODE KERJA

Page 453: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR READY MIX K-225

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 454: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR READY MIX K-225

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 455: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR K-225 ( SITE MIX )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 456: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR K-225 ( SITE MIX )

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUANU R A I A N

METODE KERJA

Page 457: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR SITE MIX K-175

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 458: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR SITE MIX K-175

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 459: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON SIKLOP STRUKTUR SITE MIX K-175

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

U R A I A N

METODE KERJA

Page 460: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON SIKLOP STRUKTUR SITE MIX K-175

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 461: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR SITE MIX K-125

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 462: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BETON STRUKTUR SITE MIX K-125

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M3

U R A I A N

METODE KERJA

Page 463: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PEMBESIAN BAJA TULANGAN

SATUAN PEMBAYARAN : Kg

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 464: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BEKISTING UNTUK BETON STRUKTUR (JEMBATAN)

SATUAN PEMBAYARAN : M2

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Volume pekerjaan : M2

U R A I A N

METODE KERJA

Page 465: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BEKISTING UNTUK BETON STRUKTUR SALURAN

SATUAN PEMBAYARAN : M2

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 466: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PONDASI CERUCUK, PENYEDIAAN DAN PEMANCANGAN

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

METODE KERJA

U R A I A N

Page 467: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : DINDING TURAP BAJA

SATUAN PEMBAYARAN : Kg

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 468: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : DINDING TURAP BAJA

SATUAN PEMBAYARAN : Kg

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 469: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BRONJONG

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Didapat Harga Satuan Pekerjaan :

METODE KERJA

U R A I A N

Page 470: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BRONJONG (DENGAN ANGKUTAN)

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 471: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PEMBONGKARAN BETON ( MANUAL )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 472: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PEMBONGKARAN BETON ( MANUAL )

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

Volume pekerjaan : M3

METODE KERJA

U R A I A N

Page 473: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BORE PILE BETON, Dia. 300 mm

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 474: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BORE PILE BETON, Dia. 300 mm

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 475: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BORE PILE BETON, Dia. 400 mm

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 476: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BORE PILE BETON, Dia. 400 mm

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUANU R A I A N

METODE KERJA

Page 477: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BORE PILE BETON, Dia. 500 mm

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 478: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BORE PILE BETON, Dia. 500 mm

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 479: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PEMANCANGAN SHEET PILE

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 480: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PEMANCANGAN SHEET PILE

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUAN

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

METODE KERJA

U R A I A N

Page 481: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-325-A-1000 P : 8-13, K-700

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 482: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-325-A-1000 P : 8-13, K-700

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUAN

Volume pekerjaan : M'

METODE KERJA

U R A I A N

Page 483: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-325-B-1000 P : 8-14, K-700

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 484: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-325-B-1000 P : 8-14, K-700

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

METODE KERJA

U R A I A N

Page 485: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-350-A-1000 P : 9-15, K-700

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 486: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-350-A-1000 P : 9-15, K-700

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUAN

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

METODE KERJA

U R A I A N

Page 487: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-350-B-1000 P : 10-15, K-700

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 488: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-350-B-1000 P : 10-15, K-700

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUAN

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

METODE KERJA

U R A I A N

Page 489: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-400-A-1000 P : 10-16, K-700

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 490: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-400-A-1000 P : 10-16, K-700

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 491: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-400-B-1000 P : 11-16, K-700

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 492: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-400-B-1000 P : 11-16, K-700

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUAN

Volume pekerjaan : M'

METODE KERJA

U R A I A N

Page 493: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-450-A-1000 P : 11-17, K-700

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 494: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-450-A-1000 P : 11-17, K-700

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUAN

Volume pekerjaan : M'

METODE KERJA

U R A I A N

Page 495: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-450-B-1000 P : 12-17, K-700

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 496: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN SHEET PILE TYPE W-450-B-1000 P : 12-17, K-700

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUAN

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

METODE KERJA

U R A I A N

Page 497: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN FLAT SHEET PILE, K-700

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 498: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENYEDIAAN FLAT SHEET PILE, K-700

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

METODE KERJA

U R A I A N

Page 499: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PEMANCANGAN TIANG PANCANG

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 500: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PEMANCANGAN TIANG PANCANG

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUAN

HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :

Rp. 0.00 / M'

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

METODE KERJA

U R A I A N

Page 501: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Penyediaan Tiang Pancang Type A2-300 - 6 s/d 8, Segmen Bottom

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 502: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Penyediaan Tiang Pancang Type A2-300 - 6 s/d 8, Segmen Bottom

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUAN

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

METODE KERJA

U R A I A N

Page 503: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Penyediaan Tiang Pancang Type A2-300 - 6 s/d 8, Segmen Bottom Pencil

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 504: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Penyediaan Tiang Pancang Type A2-300 - 6 s/d 8, Segmen Bottom Pencil

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUAN

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

METODE KERJA

U R A I A N

Page 505: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Penyediaan Tiang Pancang Type A2-300 - 6 s/d 8, Segmen Middle

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 506: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Penyediaan Tiang Pancang Type A2-300 - 6 s/d 8, Segmen Middle

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUAN

Volume pekerjaan : M'

METODE KERJA

U R A I A N

Page 507: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Penyediaan Tiang Pancang Type A2-400 - 6 s/d 8, Segmen Bottom

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 508: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Penyediaan Tiang Pancang Type A2-400 - 6 s/d 8, Segmen Bottom

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUAN

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

METODE KERJA

U R A I A N

Page 509: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Penyediaan Tiang Pancang Type A2-400 - 6 s/d 8, Segmen Bottom Pencil

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 510: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Penyediaan Tiang Pancang Type A2-400 - 6 s/d 8, Segmen Bottom Pencil

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUAN

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

METODE KERJA

U R A I A N

Page 511: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Penyediaan Tiang Pancang Type A2-400 - 6 s/d 8, Segmen Middle

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 512: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : Penyediaan Tiang Pancang Type A2-400 - 6 s/d 8, Segmen Middle

SATUAN PEMBAYARAN : M'

Lanjutan

No. KODE KOEF. SATUAN

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M'

METODE KERJA

U R A I A N

Page 513: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN JALAN BETON K-350

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 514: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN JALAN BETON K-350

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 515: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN JALAN BETON K-350 ( DENGAN ANGKUTAN )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 516: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN JALAN BETON K-350 ( DENGAN ANGKUTAN )

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 517: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN JALAN BETON READY MIX K-225

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 518: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN JALAN BETON READY MIX K-225

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 519: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN JALAN BETON READY MIX K-225 ( DENGAN ANGKUTAN )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 520: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN JALAN BETON READY MIX K-225 ( DENGAN ANGKUTAN )

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUAN

METODE KERJA

U R A I A N

Page 521: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN JALAN BETON K-225 ( SITE MIX )

SATUAN PEMBAYARAN : M3

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 522: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN JALAN BETON K-225 ( SITE MIX )

SATUAN PEMBAYARAN : M3

Lanjutan

No. KODE KOEF. SATUANU R A I A N

METODE KERJA

Page 523: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : ACUAN PERKERASAN BETON

SATUAN PEMBAYARAN : M2

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 524: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN PLASTIC SHEET

SATUAN PEMBAYARAN : M2

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Lihat perhitungan dalam ANALISA

HARGA SATUAN PEKERJAAN

6. WAKTU PELAKSANAAN YANG DIPERLUKAN

Masa Pelaksanaan : . . . . . . . . . . . . bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M2

U R A I A N

Page 525: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : JOINT SEALENT

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

U R A I A N

Page 526: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PEMOTONGAN POHON KERAS

SATUAN PEMBAYARAN : Buah

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Berlanjut ke halaman berikut

METODE KERJA

U R A I A N

Page 527: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PEMOTONGAN POHON KERAS

SATUAN PEMBAYARAN : Buah

Lanjutan

No. KODE KOEF. SATUAN

Volume pekerjaan : Buah

METODE KERJA

U R A I A N

Page 528: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PEMOTONGAN POHON LUNAK

SATUAN PEMBAYARAN : Buah

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 529: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENGUPASAN DAN PEMBERSIHAN SEMAK

SATUAN PEMBAYARAN : M2

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 530: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PENGUPASAN DAN PEMBERSIHAN GULMAN

SATUAN PEMBAYARAN : M2

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 531: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : STABILISASI DENGAN TANAMAN

SATUAN PEMBAYARAN : M2

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

7. VOLUME PEKERJAAN YANG DIPERLUKAN

Volume pekerjaan : M2

U R A I A N

METODE KERJA

Page 532: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : MARKA JALAN TERMOPLASTIK (MANUAL)

SATUAN PEMBAYARAN : M2

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 533: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : MARKA JALAN BUKAN TERMOPLASTIK (MANUAL)

SATUAN PEMBAYARAN : M2

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

U R A I A N

METODE KERJA

Page 534: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN KANSTEEN 15.25.40

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

HARGA SATUAN PEKERJAAN

METODE KERJA

U R A I A N

Page 535: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN KANSTEEN 13.20.40

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN

Lihat perhitungan dalam ANALISA

HARGA SATUAN PEKERJAAN

METODE KERJA

U R A I A N

Page 536: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN KANSTEEN 15.28.40

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN

Lihat perhitungan dalam ANALISA

HARGA SATUAN PEKERJAAN

U R A I A N

METODE KERJA

Page 537: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN KANSTEEN 20.25.60

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT

Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN

Lihat perhitungan dalam ANALISA

HARGA SATUAN PEKERJAAN

METODE KERJA

U R A I A N

Page 538: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PASANGAN KANSTEEN 30.25.60

SATUAN PEMBAYARAN : M'

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 539: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN PAVING BLOK (PEDESTRIAN)

SATUAN PEMBAYARAN : M2

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

U R A I A N

METODE KERJA

Page 540: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN PAVING BLOK, t = 8 cm (JALAN)

SATUAN PEMBAYARAN : M2

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 541: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : PERKERASAN PAVING BLOK, t = 6 cm (JALAN)

SATUAN PEMBAYARAN : M2

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N

Page 542: AHS 2014 - upload OK FIX.pdf

JENIS PEKERJAAN : BONGKAR DAN PEMASANGAN KEMBALI PAVING BLOK

SATUAN PEMBAYARAN : M2

No. KODE KOEF. SATUAN

I. ASUMSI

II. URUTAN KERJA

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

METODE KERJA

U R A I A N