 DAFTAR ANALISA PEKERJAAN (Rp) (Rp) 1 2 3 4 5 6 7 1 03-2835-2002 PEKERJAAN PERSIAPAN 6,2 1 m' Pagar Sementara dari seng Gelombang tinggi 2,00 93,976.10 6.2.1 Bahan 75,476.10 1.25 btg Kayu Dolken diameter 8 - 10 / 400 cm 12,000.00 15,000.00 2.5 kg Portland Cement 675.00 1,687.50 1.2 LbrSeng Gelombang 3" - 5 " 39,000.00 46,800.00 0.005 m3 Pasir Beton 120,000.00 600.00 0.009 m3 Koral Beton 120,000.00 1,080.00 0.072 m3 Kayu 5/7 x 4 m kayu kruing 58,800.00 4,233.60 0.06 k g Paku Biasa 2" - 5" 7,500.00 450.00 0.45 kg Meni besi 12,500.00 5,625.00 6.2.2 Tenaga 18,500.00 0.2 OH Tukang Kayu 35,000.00 7,000.00 0.4 OHPekerja 25,000.00 10,000.00 0.02 OH Kepala Tukang 40,000.00 800.00 0.02 OH Mandor 35,000.00 700.00 6,4 1 m' Pengukuran dan Pemasangan Bouwplank 36,830.60 6.41 Bahan 30,255.60 0.012 m3 Kayu 5/7 x 4 m kayu kruing 58,800.00 705.60 0.02 k g Paku biasa 2" - 5" 7,500.00 150.00 0.007 m3 Kayu papan 3/20 Kruing 4,200,000.00 29,400.00 6.4.2 Tenaga 6,575.00 0.1 OH Tukang Kayu 35,000.00 3,500.00 0.1 OHPekerja 25,000.00 2,500.00 0.01 OHKepala Tukang 40,000.00 400.00 0.005 OH Mandor 35,000.00 175.00 6,5 1 m2 Pembuatan Kantor Sementara Dg Lantai Plesteran 435,160.00 6.5.1 Bahan 266,410.00 1.25 btg Kayu Dolken diame ter 8 - 10 / 400 cm 12,000.00 15,000.00 0.18 m3 Kayu kamper 750,000.00 135,000.00 0.85 kg paku biasa 2" - 5" 7,500.00 6,375.00 1.1 kg Besi strip 9,200.00 10,120.00 35 kg Portland cement 675.00 23,625.00 0.15 m3 Pasir pasang 90,000.00 13,500.00 0.1 m3 pasir beton 120,000.00 12,000.00 0.15 m3 Koral beton 120,000.00 18,000.00 30 bh Batu bata merah 200.00 6,000.00 0.25 lbr Seng plat 11,000.00 2,750.00 2 bh jendela Naco 5,500.00 11,000.00 0.08 m2 Kaca Polos 40,000.00 3,200.00 0.15 bh Kunci tanam 35,000.00 5,250.00 0.3 bh Engsel 2,500.00 750.00 0.06 l br Plywood 4 mm 64,000.00 3,840.00 6.5.2 Tenaga 168,750.00 2 OH Tukang Kayu 35,000.00 70,000.00 1 OH Tukang batu 35,000.00 35,000.00 2 OH Pekerja 25,000.00 50,000.00 0.3 OHKepala Tukang 40,000.00 12,000.00 0.05 OH Mandor 35,000.00 1,750.00 6,6 1 m2 Pembuatan Gudang Semen dan Alat-alat 360,087.50 Bahan 255,337.50 6.6.1 1.7 btg Kayu Dolken diameter 8 - 10 / 400 cm 12,000.00 20,400.00 0.21 m3 Kayu 750,000.00 157,500.00 0.3 kg paku biasa 2" - 5" 7,500.00 2,250.00 10.5 kg Portland cement 675.00 7,087.50 0.03 m3 pasir beton 120,000.00 3,600.00 0.05 m3 Koral beton 120,000.00 6,000.00 1.5 lbr Seng gelombang BJLS 32 39,000.00 58,500.00 6.6.2 Tenaga 104,750.00 2 OH Tukang Kayu 35,000.00 70,000.00 1 OH Pekerja 25,000.00 25,000.00 0.2 OHKepala Tukang 40,000.00 8,000.00 0.05 OH Mandor 35,000.00 1,750.00 HARGA SATUAN BAHAN / UPAH JUMLAH KOEF KODE SNI NO URAIAN PEKERJAAN SAT

Upload: golek-profitfx

Post on 19-Jul-2015

74 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 1/45

DAFTAR ANALISA PEKERJAAN

(Rp) (Rp)

1 2 3 4 5 6 7

1 03-2835-2002 PEKERJAAN PERSIAPAN

6,2 1 m' Pagar Sementara dari seng Gelombang tinggi 2,00 936.2.1 Bahan 75

1.25 btg Kayu Dolken diameter 8 - 10 / 400 cm 12,000.00 15

2.5 kg Portland Cement 675.00 1

1.2 Lbr Seng Gelombang 3" - 5 " 39,000.00 46

0.005 m3 Pasir Beton 120,000.00

0.009 m3 Koral Beton 120,000.00 1

0.072 m3 Kayu 5/7 x 4 m kayu kruing 58,800.00 4

0.06 kg Paku Biasa 2" - 5" 7,500.00

0.45 kg Meni besi 12,500.00 5

6.2.2 Tenaga 18

0.2 OH Tukang Kayu 35,000.00 7

0.4 OH Pekerja 25,000.00 10

0.02 OH Kepala Tukang 40,000.00

0.02 OH Mandor 35,000.00

6,4 1 m' Pengukuran dan Pemasangan Bouwplank 36

6.41 Bahan 30

0.012 m3 Kayu 5/7 x 4 m kayu kruing 58,800.00

0.02 kg Paku biasa 2" - 5" 7,500.00

0.007 m3 Kayu papan 3/20 Kruing 4,200,000.00 29

6.4.2 Tenaga 6

0.1 OH Tukang Kayu 35,000.00 3

0.1 OH Pekerja 25,000.00 2

0.01 OH Kepala Tukang 40,000.00

0.005 OH Mandor 35,000.00

6,5 1 m2 Pembuatan Kantor Sementara Dg Lantai Plesteran 435

6.5.1 Bahan 2661.25 btg Kayu Dolken diameter 8 - 10 / 400 cm 12,000.00 15

0.18 m3 Kayu kamper 750,000.00 135

0.85 kg paku biasa 2" - 5" 7,500.00 6

1.1 kg Besi strip 9,200.00 10

35 kg Portland cement 675.00 23

0.15 m3 Pasir pasang 90,000.00 13

0.1 m3 pasir beton 120,000.00 12

0.15 m3 Koral beton 120,000.00 18

30 bh Batu bata merah 200.00 6

0.25 lbr Seng plat 11,000.00 2

2 bh jendela Naco 5,500.00 11

0.08 m2 Kaca Polos 40,000.00 3

0.15 bh Kunci tanam 35,000.00 5

0.3 bh Engsel 2,500.00

0.06 lbr Plywood 4 mm 64,000.00 3

6.5.2 Tenaga 168

2 OH Tukang Kayu 35,000.00 70

1 OH Tukang batu 35,000.00 35

2 OH Pekerja 25,000.00 50

0.3 OH Kepala Tukang 40,000.00 12

0.05 OH Mandor 35,000.00 1

6,6 1 m2 Pembuatan Gudang Semen dan Alat-alat 360

Bahan 255

6.6.1 1.7 btg Kayu Dolken diameter 8 - 10 / 400 cm 12,000.00 20

0.21 m3 Kayu 750,000.00 157

0.3 kg paku biasa 2" - 5" 7,500.00 2

10.5 kg Portland cement 675.00 7

0.03 m3 pasir beton 120,000.00 30.05 m3 Koral beton 120,000.00 6

1.5 lbr Seng gelombang BJLS 32 39,000.00 58

HARGA SATUAN

BAHAN / UPAHJUMLA

KOEFKODESNINO URAIAN PEKERJAANSAT

Page 2: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 2/45

6,8 1 m2 Membersihkan Lapangan dan Perataan 4

6.8.2 Tenaga 4

0.10 OH Pekerja 25,000.00 2

0.05 OH Mandor 35,000.00 1

6,11 1 m2 Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm 20

6.11.1 Bahan 8

1.00 btg Bambu Diameter 6 - 8 / 600 cm 7,000.00 7

0.25 kg Tali ijuk 5,000.00 1

6.11.2 Tenaga 12

0.17 OH Tukang kayu 35,000.00 5

0.25 OH pekerja 25,000.00 6

0.002 OH Kepala Tukang 40,000.00

0.0013 OH Mandor 35,000.00

6,13 1 m3 Bongkaran Beton Bertulang 178

6.13.2 Tenaga 178

6.667 OH Pekerja 25,000.00 166

0.333 OH Mandor 35,000.00 11

6,14 1 m3 Bongkaran Dinding Tembok Bata Merah 167

6.14.2 Tenaga 167

6.667 OH Pekerja 25,000.00 1660.033 OH Mandor 35,000.00 1

2 03-2835-1992 PEKERJAAN TANAH

6,1 1 m3 Galian Tanah Biasa Sedalam 1m 11

6.1.2 Tenaga 11

0.400 OH Pekerja 25,000.00 10

0.040 OH Mandor 35,000.00 1

6,4 1 m3 Galian Tanah Keras Sedalam 1m 17

6.4.2 Tenaga 17

0.625 OH Pekerja 25,000.00 15

0.062 OH Mandor 35,000.00 2

6,5 1 m3 Galian Tanah cadas Sedalam 1m 35

6.5.2 Tenaga 35

1.250 OH Pekerja 25,000.00 31

0.125 OH Mandor 35,000.00 4

6,6 1 m3 Galian Tanah lumpur Sedalam 1m 23

6.6.2 Tenaga 23

0.823 OH Pekerja 25,000.00 20

0.083 OH Mandor 35,000.00 2

6,7 1 m2 Pekerjaan Striping setinggi 1 m 1

6.7.2 Tenaga 1

0.050 OH Pekerja 25,000.00 1

0.005 OH Mandor 35,000.00

6,9 1 m3 Urugan Kembali 5

6.9.2 Tenaga 5

0.192 OH Pekerja 25,000.00 4

0.019 OH Mandor 35,000.00

6,10 1 m3 Pemadatan tanah 14

6.10.2 Tenaga 14

0.500 OH Pekerja 25,000.00 12

0.050 OH Mandor 35,000.00 1

6,11 1 m3 Urugan Pasir 79

6.11.1 Bahan 72

1.200 m3 Pasir urug 60,000.00 72

6.11.2 Tenaga 70.300 OH Pekerja 25,000.00 7

0.010 OH Mandor 35,000.00

Page 3: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 3/45

6,12 1 m3 Lapisan Pudel cmp 1kp : 3ps : 7TL 102

6.12.1 Bahan 62

0.33 m3 Pasir urug 60,000.00 19

0.109 m3 Kapur padam 115,000.00 12

0.763 m3 Tanah liat 40,000.00 30

6.12.2 Tenaga 39

0.833 OH Pekerja 25,000.00 20

0.416 OH Tukang batu 35,000.00 140.04 OH Kepala tukang 40,000.00 1

0.083 OH Mandor 35,000.00 2

6,14 1 m3 Pemasangan Lapisan Ijuk 154

6.14.1 Bahan 150

1.200 m3 Ijuk 125,000.00 150

6.14.2 Tenaga 4

0.15 OH Pekerja 25,000.00 3

0.015 OH Mandor 35,000.00

6,15 1 m3 Urugan Sirtu 103

6.15.1 Bahan 96

1.2 m3 Sirtu 80,000.00 96

6.15.2 Tenaga 7

0.25 OH Pekerja 25,000.00 6

0.025 OH Mandor 35,000.00

3 03-2836-2002 PEKERJAAN PONDASI

6,4 1 m3 Pasang Pondasi Batu kali 1Pc : 3Ps 370

6.4.1 Bahan 306

1.1 m3 Batu belah 15/20 115,000.00 126

202 kg Portland cement 675.00 136

0.485 m3 Pasir 90,000.00 43

6.4.2 Tenaga 63

1.5 OH Pekerja 25,000.00 37

0.6 OH Tukang batu 35,000.00 210.06 OH Kepala Tukang 40,000.00 2

0.075 OH Mandor 35,000.00 2

6,6 1 m3 Pasang Pondasi Batu Kali 1Pc : 5Ps 330

6.6.1 Bahan 267

1.1 m3 Batu belah 15/20 115,000.00 126

136 kg Portland cement 675.00 9

0.544 m3 Pasir 90,000.00 48

6.6.2 Tenaga 63

1.5 OH Pekerja 25,000.00 37

0.6 OH Tukang batu 35,000.00 2

0.06 OH Kepala Tukang 40,000.00 2

0.075 OH Mandor 35,000.00 2

6,12 1 m3 Pasang Pondasi Kali 1Pc : 3 Kp : 10 Ps 292

6.12.1 Bahan 228

1.1 m3 Batu belah 15/20 115,000.00 126

61 kg Portland cement 675.00 4

0.147 m3 Kapur pasang 115,000.00 16

0.492 m3 Pasir 90,000.00 44

6.12.2 Tenaga 63

1.5 OH Pekerja 25,000.00 37

0.6 OH Tukang batu 35,000.00 2

0.06 OH Kepala Tukang 40,000.00 2

0.075 OH Mandor 35,000.00 2

6,14 1 m3 Pasang Pondasi Batu Kosong 192

6.14.1 Bahan 156

1.2 m3 Batu belah 15/20 115,000.00 138

0.3 m3 Pasir urug 60,000.00 18

Page 4: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 4/45

6,15 1 m3 Pasang Pondasi Siklop 40% batu kali 802

6.15.1 Bahan 689

75 kg Besi beton 6,000.00 450

202 kg Portland sement 675.00 136

0.32 m3 Pasir beton 120,000.00 38

0.49 m3 Koral beton 120,000.00 58

0.8 kg Kawat Beton 7,500.00 6

6.15.2 Tenaga 1133 OH Pekerja 25,000.00 75

0.85 OH Tukang batu 35,000.00 29

0.085 OH Kepala Tukang 40,000.00 3

0.15 OH Mandor 35,000.00 5

6,16 1 m3 Pasang Pondasi Sumuran diameter 100 cm 449

6.16.1 Bahan 375

0.45 m3 Batu belah 15/20 cm 115,000.00 5

280 kg Portland cement 675.00 189

0.45 m3 Pasir beton 120,000.00 54

0.67 m3 Koral beton 120,000.00 80

6.16.2 Tenaga 74

2.38 OH Pekerja 25,000.00 59

0.3 OH Tukang batu 35,000.00 100.03 OH Kepala Tukang 40,000.00

0.08 OH Mandor 35,000.00 2

6,17 1 m' Pembuatan Tiang Pancang (40x40) cm, beton bertulang 406

6.17.1 Bahan 353

0.019 m3 Pasir urug darat 60,000.00

0.094 m3 Pasir beton 120,000.00 1

0.15 m3 koral beton 120,000.00 18

60.5 kg Portland cement 675.00 40

45 kg besi beton 6,000.00 270

0.9 kg kawat beton 7,500.00 6

0.032 m3 Kayu kaso 5/7 24,500.00

0.12 kg Paku 7,500.00

0.09 ltr minyak bekesting 18,000.00

0.24 kg Plamur Tembok 8,500.00 2

6.17.2 Tenaga 52

1 OH Pekerja 25,000.00 25

0.67 OH Tukang batu 35,000.00 23

0.067 OH Kepala Tukang 40,000.00 2

0.05 OH Mandor 35,000.00

4 03-2837-2002 PEKERJAAN DINDING

6,9 1 m2 Pasang Batu Merah Tebal 1/2 bt, 1 Pc : 2Ps 42

6.9.1 Bahan 30

70 bh Bata Merah 5 x 11 x 22 200.00 14

18.95 kg Portland cement 675.00 12

0.038 m3 Pasir pasang 90,000.00 3

6.9.2 Tenaga 12

0.32 OH Pekerja 25,000.00 8

0.1 OH Tukang batu 35,000.00 3

0.01 OH Kepala Tukang 40,000.00

0.015 OH Mandor 35,000.00

6,10 1 m2 Pasang Batu Merah tebal 1/2 bt, 1Pc : 3Ps 39

6.10.1 Bahan 27

70 bh Bata Merah 5 x 11 x 22 200.00 14

14.37 kg Portland cement 675.00 9

0.04 m3 Pasir pasang 90,000.00 3

6.10.2 Tenaga 12

0.32 OH Pekerja 25,000.00 8

0.1 OH Tukang batu 35,000.00 30.01 OH Kepala Tukang 40,000.00

0.015 OH Mandor 35,000.00

Page 5: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 5/45

6.15.2 Tenaga 1

0.32 OH Pekerja 25,000.00 8

0.1 OH Tukang batu 35,000.00 3

0.01 OH Kepala Tukang 40,000.00

0.015 OH Mandor 35,000.00

5 03-2837-2002 PEKERJAAN PLESTERAN

6,3 1 m2 Plesteran 1Pc : 3Ps Tebal 15 mm 176.3.1 Bahan

0.162 6.48 kg Portland cement 675.00 4

6.17284 0.019 m3 Pasir pasang 90,000.00

6.3.2 Tenaga 1

0.2 OH Pekerja 25,000.00 5

0.15 OH Tukang batu 35,000.00 5

0.015 OH Kepala Tukang 40,000.00

0.01 OH Mandor 35,000.00

6,9 1 m2 Plesteran 1Pc : 3Kp : 10Ps Tebal 15 mm 14

6.9.1 Bahan

1.84 kg Portland cement 675.00

0.006 m3 Kapur padam 115,000.00

0.014 m3 Pasir pasang 90,000.00

6.9.2 Tenaga 1

0.2 OH Pekerja 25,000.00 5

0.15 OH Tukang batu 35,000.00 5

0.015 OH Kepala Tukang 40,000.00

0.01 OH Mandor 35,000.00

6,14 1 m2 Plesteran 1Pc : 3Ps tebal 20 mm 24

6.14.1 Bahan

10.8 kg Portland cement 675.00 7

0.026 m3 Pasir pasang 90,000.00 2

6.14.2 Tenaga 10.25 OH Pekerja 25,000.00 6

0.2 OH Tukang batu 35,000.00 7

0.02 OH Kepala Tukang 40,000.00

0.0125 OH Mandor 35,000.00

6,28 1 m2 Berapen 1Pc : 5Ps tebal 15 mm 12

6.28.1 Bahan

5.67 kg Portland cement 675.00 3

0.023 m3 Pasir pasang 90,000.00 2

6.28.2 Tenaga

0.15 OH Pekerja 25,000.00 3

0.07 OH Tukang batu 35,000.00 2

0.007 OH Kepala Tukang 40,000.00

0.008 OH Mandor 35,000.00

6,29 1 m2 Plesteran Beton 1Pc : 2Ps tebal 15 mm 22

6.29.1 Bahan

9.3 kg Portland cement 675.00 6

0.018 m3 Pasir pasang 90,000.00

6.29.2 Tenaga 1

0.26 OH Pekerja 25,000.00 6

0.2 OH Tukang batu 35,000.00 7

0.02 OH Kepala Tukang 40,000.00

0.013 OH Mandor 35,000.00

6,31 1 m2 Plesteran Skoneng 1Pc : 2Ps 4

6.31.1 Bahan

0.5 kg Portland cement 675.000.002 m3 Pasir pasang 90,000.00

Page 6: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 6/45

6 31 2 T

6,34 1 m2 Plesteran Ciprat 1Pc : 2Ps 18

6.34.1 Bahan

9 kg Portland cement 675.00

0.016 m3 Pasir pasang 90,000.00

6.34.2 Tenaga 1

0.25 OH Pekerja 25,000.00

0.1 OH Tukang batu 35,000.00 30.01 OH Kepala Tukang 40,000.00

0.015 OH Mandor 35,000.00

6,35 1 m2 Plesteran Siar Adukan 1Pc : 2Ps 1

6.35.1 Bahan

5.4 kg Portland cement 675.00 3

0.0085 m3 Pasir pasang 90,000.00

6.35.2 Tenaga

0.15 OH Pekerja 25,000.00 3

0.07 OH Tukang batu 35,000.00

0.007 OH Kepala Tukang 40,000.00

0.008 OH Mandor 35,000.00

6 03-3434-2002 PEKERJAAN KAYU

6.1 1 m3 Pasang Kosen Pintu & Jendela Kayu Jati 12,340

6.1.1 Bahan 11,40

1.200 m3 Kayu jati, Balok 9,500,000.00 11,40

6.1.2 Tenaga 94

6.000 OH Pekerja 25,000.00 15

20.000 OH Tukang kayu 35,000.00 70

2.000 OH Kepala Tukang 40,000.00 8

0.300 OH Mandor 35,000.00 1

6.5 1 m2 Pasang Pintu Klamp Kayu Kamfer 22

6.5.1 Bahan 17

0.036 m3 Kayu Kamper papan 4,750,000.00 17

0.050 kg Paku biasa 2" - 5" 7,500.00

6.5.2 Tenaga 5

0.350 OH Pekerja 25,000.00

1.050 OH Tukang kayu 35,000.00 3

0.105 OH Kepala Tukang 40,000.00 4

0.018 OH Mandor 35,000.00

6.8 1 m2 Pasang Pintu Panel Kayu Kamfer 314

6.8.1 Bahan 19

0.040 m3 Kayu Kamper, papan 4,750,000.00 19

6.8.2 Tenaga 12

1.000 OH Pekerja 25,000.00 2

2.500 OH Tukang kayu 35,000.00 8

0.250 OH Kepala Tukang 40,000.00 10.050 OH Mandor 35,000.00

6.10 1 m2 Pasang Pintu & Jendela Kaca Kayu Kamfer 265

6.10.1 Bahan 16

0.035 m3 Kayu Kamper, papan 4,750,000.00 16

6.10.2 Tenaga 9

0.800 OH Pekerja 25,000.00 2

2.000 OH Tukang kayu 35,000.00 7

0.200 OH Kepala Tukang 40,000.00

0.040 OH Mandor 35,000.00

6.12 1 m2 Pasang Pintu & Jendela Jalusi Kayu Jati 920

6.12.1 Bahan 76

0.064 m3 Kayu jati, papan 12,000,000.00 76

6.12.2 Tenaga 15

Page 7: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 7/45

g

6.15 1 m2 Pasang Pintu Plywood Rangkap Rangka Kayu Kamfer 256

6.15.1 Bahan 162

0.020 m3 Kayu kamfer, papan 4,750,000.00 93

0.030 kg Paku biasa 1/2" - 1" 7,500.00

0.300 ltr Lem kayu 18,000.00 5

1.000 lbr Plywood 4" x 3" x 4mm 64,000.00 64

6.15.2 Tenaga 940.600 OH Pekerja 25,000.00 15

2.000 OH Tukang kayu 35,000.00 70

0.200 OH Kepala Tukang 40,000.00 8

0.030 OH Mandor 35,000.00

6.16 1 m2 Pasang Jalusi mati kosen kayu jati 812

6.16.1 Bahan 72

0.060 m3 Kayu jati, papan 12,000,000.00 720

0.150 kg Paku biasa 1/2" - 1" 7,500.00

6.16.2 Tenaga 9

0.500 OH Pekerja 25,000.00 12

2.000 OH Tukang kayu 35,000.00 70

0.200 OH Kepala Tukang 40,000.00 8

0.025 OH Mandor 35,000.00

6.17 1 m2 Pasang Jalusi mati kosen kayu kamfer 377

6.17.1 Bahan 286

0.060 m3 Kayu kamfer, papan 4,750,000.00 285

0.150 kg Paku biasa 1/2" - 1" 7,500.00

6.17.2 Tenaga 9

0.500 OH Pekerja 25,000.00 12

2.000 OH Tukang kayu 35,000.00 70

0.200 OH Kepala Tukang 40,000.00 8

0.025 OH Mandor 35,000.00

6.19 1 m2 Pasang pintu Teakwood rangkap rangka kayu jati 398

6.19.1 Bahan 304

0.020 m3 Kayu jati, papan 12,000,000.00 2350.030 kg Paku biasa 1/2" - 1" 7,500.00

0.300 ltr lem kayu 18,000.00 5

1.000 lbr teakwood 4" x 8 " x 4 mm 64,000.00 64

6.19.2 Tenaga 94

0.600 OH Pekerja 25,000.00 15

2.000 OH Tukang kayu 35,000.00 70

0.200 OH Kepala Tukang 40,000.00 8

0.030 OH Mandor 35,000.00

6.20 1 m2 Pasang pintu Teakwood rangkap rangka kayu kamfer 256

6.20.1 Bahan 162

0.020 m3 Kayu kamfer, papan 4,750,000.00 93

0.030 kg Paku biasa 1/2" - 1" 7,500.00

0.300 ltr lem kayu 18,000.00 51.000 lbr teakwood 4" x 8 " x 4 mm 64,000.00 64

6.20.2 Tenaga 94

0.600 OH Pekerja 25,000.00 15

2.000 OH Tukang kayu 35,000.00 70

0.200 OH Kepala Tukang 40,000.00 8

0.030 OH Mandor 35,000.00

6.22 1 m2 Pasang pintu plywood & Formika rangka kayu Kamfer 270

6.22.1 Bahan 15

0.020 m3 Kayu kamfer, papan 4,750,000.00 93

0.030 kg Paku biasa 1/2" - 1" 7,500.00

0.300 ltr lem kayu 18,000.00 5

0.500 lbr plywood 4" x 8 " x 4 mm 64,000.00 32

0.500 lbr Formika 4" x 3" (untuk pintu) 42,000.00 2

6.22.2 Tenaga 118

Page 8: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 8/45

0 800 OH P k j 25 000 00 20

6.25 1 m2 Pasang pintu Formika double rangka kayu jati 49

6.25.1 Bahan 36

0.020 m3 Kayu jati, papan 12,000,000.00 235

0.030 kg Paku biasa 1/2" - 1" 7,500.00

1.200 ltr lem kayu 18,000.00 2

1.000 lbr plywood 4" x 8 " x 4 mm 64,000.00 64

1.000 lbr Formika 4" x 3" (untuk pintu) 42,000.00 42

6.25.2 Tenaga 128

1.000 OH Pekerja 25,000.00 25

2.600 OH Tukang kayu 35,000.00 9

0.260 OH Kepala Tukang 40,000.00 10

0.050 OH Mandor 35,000.00

6.28 1 m3 Pasang Konstruksi Kuda-Kuda kayu kamfer 5,732

6.28.1 Bahan 5,09

1.100 m3 Kayu kamfer, balok 4,500,000.00 4,950

15.00 kg Besi Strip 9,200.00 138

0.800 kg Paku biasa 2" - 5" 7,500.00 6

6.28.2 Tenaga 638

4.000 OH Pekerja 25,000.00 100

12.000 OH Tukang kayu 35,000.00 4201.200 OH Kepala Tukang 40,000.00 48

2.000 OH Mandor 35,000.00 70

6.31 1 m2 Pasang Kaso dan Reng Genteng Kodok Kayu Kamfer 6

6.31.1 Bahan 5

0.012 Kayu kamfer balok 4,500,000.00 54

0.15 Paku biasa 2" - 5" 7,500.00

6.31.2 Tenaga

0.1 OH Pekerja 25,000.00 2

0.1 OH Tukang kayu 35,000.00 3

0.01 OH Kepala Tukang 40,000.00

0.005 OH Mandor 35,000.00

6.33 1 m2 Pasang Kaso dan reng Genteng Monier Kayu Jati 1406.33.1 Bahan 13

0.014 m3 Kayu jati balok 9,500,000.00 133

0.15 kg Paku biasa 2" - 5" 7,500.00

6.33.2 Tenaga

0.1 OH Pekerja 25,000.00 2

0.1 OH Tukang kayu 35,000.00 3

0.01 OH Kepala Tukang 40,000.00

0.005 OH Mandor 35,000.00

6.36 1 m2 Pasang Kaso dan reng atap sirap Kayu kamfer 75

6.36.1 Bahan 74

0.165 m3 Kayu kamfer balok 4,500,000.00 742

0.2 kg Paku biasa 2" - 5" 7,500.00

6.36.2 Tenaga

0.12 OH Pekerja 25,000.00 3

0.12 OH Tukang kayu 35,000.00 4

0.012 OH Kepala Tukang 40,000.00

0.006 OH Mandor 35,000.00

6.39 1 m2 Pasang Rangka langit-langit (1x1)m kayu kamfer 70

6.39.1 Bahan 5

0.012 m3 Kayu kamfer balok 4,500,000.00 54

0.1 kg Paku biasa 2" - 5" 7,500.00

6.39.2 Tenaga 1

0.15 OH Pekerja 25,000.00 3

0.25 OH Tukang kayu 35,000.00 8

0.025 OH Kepala Tukang 40,000.000.075 OH Mandor 35,000.00 2

Page 9: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 9/45

6.45.2 Tenaga 20

0.25 OH Pekerja 25,000.00 6

0.35 OH Tukang kayu 35,000.00 12

0.035 OH Kepala Tukang 40,000.00

0.013 OH Mandor 35,000.00

6.47 1 m' Pasang lisplank uk.(3x20) cm kayu jati 97

6.47.1 Bahan 860.007 m3 Kayu jati papan 12,000,000.00 86

0.05 kg Paku biasa 2" - 5" 7,500.00

6.47.2 Tenaga 10

0.1 OH Pekerja 25,000.00 2

0.2 OH Tukang kayu 35,000.00 7

0.025 OH Kepala Tukang 40,000.00

0.005 OH Mandor 35,000.00

6.50 1 m' Pasang lisplank uk.(3x30) cm kayu kamfer 64

6.50.1 Bahan 52

0.011 m3 Kayu kamfer papan 4,750,000.00 52

0.05 kg Paku biasa 2" - 5" 7,500.00

6.50.2 Tenaga 10.11 OH Pekerja 25,000.00 2

0.22 OH Tukang kayu 35,000.00 7

0.022 OH Kepala Tukang 40,000.00

0.005 OH Mandor 35,000.00

6.51 1 m' Pasang lisplank uk.2x(3x20) cm kayu kamfer 85

6.51.1 Bahan 69

0.015 m3 Kayu kamfer papan 4,750,000.00 68

0.06 kg Paku biasa 2" - 5" 7,500.00

6.51.2 Tenaga 16

0.15 OH Pekerja 25,000.00 3

0.25 OH Tukang kayu 35,000.00 8

0.025 OH Kepala Tukang 40,000.00

0.075 OH Mandor 35,000.00 2

6.54 1 m2 Pasang Rangka Dinding Pemisah kayu kamfer 145

6.54.1 Bahan 12

0.02 m3 Kayu kamfer balok 4,500,000.00 87

0.007 m3 Kayu kamfer papan 4,750,000.00 33

0.1 kg Paku biasa 2" - 5" 7,500.00

6.54.2 Tenaga 23

0.15 OH Pekerja 25,000.00 3

0.45 OH Tukang kayu 35,000.00 15

0.045 OH Kepala Tukang 40,000.00

0.075 OH Mandor 35,000.00 2

6.56 1 m2 Pasang dinding pemisah teakwood rangkap rangka kayu kamfer 219

6.56.1 Bahan 1950.020 m3 Kayu kamfer balok 4,500,000.00 87

0.007 m3 Kayu kamfer papan 4,750,000.00 33

0.100 kg Paku biasa 2" - 5" 7,500.00

1.000 lbr Teakwood 4" x 8" x 4 mm 64,000.00 64

0.560 ltr Lem 18,000.00 10

6.56.2 Tenaga 23

0.15 OH Pekerja 25,000.00 3

0.45 OH Tukang kayu 35,000.00 15

0.045 OH Kepala Tukang 40,000.00

0.075 OH Mandor 35,000.00 2

6.58 1 m2 Pasang dinding Lambriziring dari papan jati 155

6.58.1 Bahan 69

0.007 m3 Kayu jati balok 9,500,000.00 660.100 kg Paku biasa 2" - 5" 7,500.00

0.150 kg Paku sekrup 3,5" 14,000.00 2

Page 10: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 10/45

6.59 1 m2 Pasang Plywood tebal 4mm untuk dinding 3

6.59.1 Bahan 2

0.400 lbr plywood 4" x 8" x 4mm 64,000.00 2

0.500 kg Paku biasa 1/2" - 1" 7,500.00

6.59.2 Tenaga

0.025 OH Pekerja 25,000.00

0.075 OH Tukang kayu 35,000.000.0075 OH Kepala Tukang 40,000.00

0.0013 OH Mandor 35,000.00

7 03-3434-2002 PEKERJAAN BETON

6.1 1 m3 Membuat beton tumbuk 1Pc : 3Psr : 5kr 36

6.1.1 Bahan 31

218.0 kg Portland cement 675.00 14

0.520 m3 Pasir beton 120,000.00 6

0.87 m3 Koral beton 120,000.00 10

6.1.2 Tenaga 5

1.65 OH Pekerja 25,000.00 4

0.25 OH Tukang batu 35,000.00

0.025 OH Kepala Tukang 40,000.000.08 OH Mandor 35,000.00

6.4 1 m2 Membuat lantai kerja beton tumbuk 1Pc : 3Psr : 5kr tebal 5 cm 4

6.4.1 Bahan 1

10.0 kg Portland cement 675.00

0.026 m3 Pasir beton 120,000.00

0.044 m3 Koral beton 120,000.00

6.4.2 Tenaga 2

1.15 OH Pekerja 25,000.00 2

0.02 OH Tukang batu 35,000.00

0.002 OH Kepala Tukang 40,000.00

0.006 OH Mandor 35,000.00

6.5 1 m3 Membuat beton 1Pc : 2Psr : 3kr 366.5.1 Bahan 31

232.0 kg Portland cement 675.00 15

0.520 m3 Pasir beton 120,000.00 6

0.78 m3 Koral beton 120,000.00 9

6.5.2 Tenaga 5

1.65 OH Pekerja 25,000.00 4

0.25 OH Tukang batu 35,000.00

0.025 OH Kepala Tukang 40,000.00

0.08 OH Mandor 35,000.00

6.25 1 kg pembesian dengan besi polos atau besi ulir

6.25.1 Bahan

1.05 kg Besi beton 6,000.00

0.015 kg Kawat beton 7,500.00

6.25.2 Tenaga

0.007 OH Pekerja 25,000.00

0.007 OH Tukang batu 35,000.00

0.0007 OH Kepala Tukang 40,000.00

0.0003 OH Mandor 35,000.00

6.26 1 kg Kabel presstresed polos/strand 1

6.26.1 Bahan 1

1.05 kg Besi presstred polos 14,000.00 1

0.015 kg Kawat beton 7,500.00

6.26.2 Tenaga

0.007 OH Pekerja 25,000.00

0.007 OH Tukang batu 35,000.00

0.0007 OH Kepala Tukang 40,000.00

0.0003 OH Mandor 35,000.00

Page 11: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 11/45

6.27.2 Tenaga

0.025 OH Pekerja 25,000.00

0.025 OH Tukang batu 35,000.00

0.0025 OH Kepala Tukang 40,000.00

0.0015 OH Mandor 35,000.00

6.28 1 m2 Pasang bekesting untuk pondasi 4

6.28.1 Bahan 20.04 m3 kayu terentang 500,000.00 2

0.300 kg paku biasa 2" - 5" 7,500.00

0.100 ltr Minyak bekesting 18,000.00

6.28.2 Tenaga 1

0.3 OH Pekerja 25,000.00

0.26 OH Tukang batu 35,000.00

0.026 OH Kepala Tukang 40,000.00

0.005 OH Mandor 35,000.00

6.29 1 m2 Pasang bekesting untuk sloof 44

6.29.1 Bahan 2

0.045 m3 kayu terentang 500,000.00 2

0.300 kg paku biasa 2" - 5" 7,500.00

0.100 ltr Minyak bekesting 18,000.00

6.29.2 Tenaga 1

0.3 OH Pekerja 25,000.00

0.26 OH Tukang batu 35,000.00

0.026 OH Kepala Tukang 40,000.00

0.005 OH Mandor 35,000.00

6.30 1 m2 Pasang bekesting untuk kolom 18

6.30.1 Bahan 16

0.04 m3 kayu terentang 500,000.00 2

0.400 kg paku biasa 2" - 5" 7,500.00 3

0.200 ltr Minyak bekesting 18,000.00 3

0.015 m3 Balok kayu 4,200,000.00 63

0.350 lbr plywood tebal 9 mm 136,000.00 4

2.000 btg Dolken kayu Galam D 8-10 cm / 4 m 12,000.00 24

6.30.2 Tenaga 2

0.3 OH Pekerja 25,000.00

0.33 OH Tukang batu 35,000.00 1

0.033 OH Kepala Tukang 40,000.00

0.006 OH Mandor 35,000.00

6.31 1 m2 Pasang bekesting untuk balok 18

6.31.1 Bahan 16

0.04 m3 kayu terentang 500,000.00 2

0.400 kg paku biasa 2" - 5" 7,500.00 3

0.200 ltr Minyak bekesting 18,000.00 3

0.015 m3 Balok kayu 4,200,000.00 63

0.350 lbr plywood tebal 9 mm 136,000.00 4

2.000 btg Dolken kayu Galam D 8-10 cm / 4 m 12,000.00 24

6.31.2 Tenaga 2

0.3 OH Pekerja 25,000.00

0.33 OH Tukang batu 35,000.00 1

0.033 OH Kepala Tukang 40,000.00

0.006 OH Mandor 35,000.00

6.32 1 m2 Pasang bekesting untuk lantai 178

6.32.1 Bahan 15

0.04 m3 kayu terentang 500,000.00 2

0.400 kg paku biasa 2" - 5" 7,500.00 3

0.200 ltr Minyak bekesting 18,000.00 3

0.015 m3 Balok kayu borneo 750,000.00 1

0.350 lbr Plywood tebal 9 mm 136,000.00 4

6.000 btg Dolken kayu Galam D 8-10 cm / 4 m 12,000.00 7

6.32.2 Tenaga 2

Page 12: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 12/45

0 3 OH P k j 25 000 00

6.33 1 m2 Pasang bekesting untuk dinding 16

6.33.1 Bahan 14

0.03 m3 kayu terentang 500,000.00 1

0.400 kg paku biasa 2" - 5" 7,500.00

0.200 ltr Minyak bekesting 18,000.00

0.020 m3 Balok kayu 750,000.00 1

0.350 lbr plywood tebal 9 mm 136,000.00 4

3.000 btg Dolken kayu Galam D 8-10 cm / 4 m 12,000.00 34.000 bh Formite/penjaga jarak/spacer (alat bantu) 5,000.00 2

6.33.2 Tenaga 2

0.3 OH Pekerja 25,000.00

0.33 OH Tukang batu 35,000.00 1

0.033 OH Kepala Tukang 40,000.00

0.006 OH Mandor 35,000.00

6.34 1 m2 Pasang bekesting untuk tangga 13

6.34.1 Bahan 11

0.03 m3 kayu terentang 500,000.00 1

0.400 kg paku biasa 2" - 5" 7,500.00

0.150 ltr Minyak bekesting 18,000.00

0.015 m3 Balok kayu 750,000.00 1

0.350 lbr plywood tebal 9 mm 136,000.00 43.000 btg Dolken kayu Galam D 8-10 cm / 4 m 12,000.00 3

6.34.2 Tenaga 2

0.32 OH Pekerja 25,000.00

0.33 OH Tukang batu 35,000.00 1

0.033 OH Kepala Tukang 40,000.00

0.006 OH Mandor 35,000.00

6.35 1 m3 Membuat beton dengan mutu K-225 61

6.35.1 Bahan 41

388.000 kg Portland cement 675.00 26

0.650 m3 Pasir beton 120,000.00 7

0.650 m3 Koral beton 120,000.00 7

6.35.2 Tenaga 196.000 OH Pekerja 25,000.00 15

1.000 OH Tukang batu 35,000.00 3

0.100 OH Kepala Tukang 40,000.00

0.300 OH Mandor 35,000.00 1

6.36 1 m3 Membuat beton dengan mutu K-275 61

6.36.1 Bahan 41

400.000 kg Portland cement 675.00 27

0.400 m3 Pasir beton 120,000.00 4

0.820 m3 Koral beton 120,000.00 9

6.36.2 Tenaga 19

6.000 OH Pekerja 25,000.00 15

1.000 OH Tukang batu 35,000.00 3

0.100 OH Kepala Tukang 40,000.000.300 OH Mandor 35,000.00 1

6.37 1 m2 Pasang Jembatan Cor 2

6.37.1 Bahan 2

0.026 m3 kayu terentang 500,000.00 1

0.600 kg paku biasa 2" - 5" 7,500.00

0.500 m3 Dolken Kayu Galam D 8 - 10 / 4 m 12,000.00

6.37.2 Tenaga

0.150 OH Pekerja 25,000.00

0.050 OH Tukang kayu 35,000.00

0.005 OH Kepala Tukang 40,000.00

0.007 OH Mandor 35,000.00

6.38 1 m3 Membuat Pondasi Beton Bertulang (150kg besi + bekesting) 1,60

6.38.1 Bahan 1,40

0.20 m3 kayu terentang 500,000.00 10

Page 13: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 13/45

y g

6.38.2 Tenaga 19

3.900 OH Pekerja 25,000.00 9

0.350 OH Tukang batu 35,000.00 1

1.040 OH Tukang kayu 35,000.00 3

1.050 OH Tukang besi 35,000.00 3

0.245 OH Kepala Tukang 40,000.00

0.165 OH Mandor 35,000.00

6.39 1 m3 Membuat Sloof Beton Bertulang (200kg besi + bekesting) 2,01

6.39.1 Bahan 1,75

0.27 m3 kayu terentang 500,000.00 13

2.000 kg paku biasa 2" - 5" 7,500.00 1

0.600 ltr Minyak bekesting 18,000.00 1

200.000 kg besi beton polos 6,000.00 1,20

3.000 kg kawat beton 7,500.00 2

323.000 btg Portland Cement 675.00 21

0.520 m3 Pasir beton 120,000.00 6

0.780 m3 Koral beton 120,000.00 9

6.39.2 Tenaga 25

4.850 OH Pekerja 25,000.00 12

0.350 OH Tukang batu 35,000.00 11.560 OH Tukang kayu 35,000.00 5

1.400 OH Tukang besi 35,000.00 4

0.331 OH Kepala Tukang 40,000.00 1

0.170 OH Mandor 35,000.00

6.40 1 m3 Membuat Kolom Beton Bertulang (300kg besi + bekesting) 3,71

6.40.1 Bahan 3,30

0.40 m3 kayu terentang 500,000.00 20

4.000 kg paku biasa 2" - 5" 7,500.00 3

2.000 ltr Minyak bekesting 18,000.00 3

300.000 kg besi beton polos 6,000.00 1,80

4.500 kg kawat beton 7,500.00 3

323.000 btg Portland Cement 675.00 21

0.520 m3 Pasir beton 120,000.00 6

0.780 m3 Koral beton 120,000.00 90.150 m3 kayu balok 750,000.00 11

3.500 lbr plywood 9 mm 136,000.00 47

20.000 btg dolken diameter 8 / 4 m 12,000.00 24

6.40.2 Tenaga 41

7.300 OH Pekerja 25,000.00 18

0.350 OH Tukang batu 35,000.00 1

3.300 OH Tukang kayu 35,000.00 11

2.100 OH Tukang besi 35,000.00 7

0.570 OH Kepala Tukang 40,000.00 2

0.250 OH Mandor 35,000.00

6.41 1 m3 Membuat balok Beton Bertulang (200kg besi + bekesting) 2,82

6.41.1 Bahan 2,48

0.32 m3 kayu terentang 500,000.00 163.200 kg paku biasa 2" - 5" 7,500.00 2

1.600 ltr Minyak bekesting 18,000.00 2

200.000 kg besi beton polos 6,000.00 1,20

3.000 kg kawat beton 7,500.00 2

323.000 btg Portland Cement 675.00 21

0.520 m3 Pasir beton 120,000.00 6

0.780 m3 Koral beton 120,000.00 9

0.140 m3 kayu balok 750,000.00 10

2.800 lbr plywood 9 mm 136,000.00 38

16.000 btg dolken diameter 8 / 4 m 12,000.00 19

6.41.2 Tenaga 33

5.960 OH Pekerja 25,000.00 14

0.350 OH Tukang batu 35,000.00 1

2.800 OH Tukang kayu 35,000.00 91.400 OH Tukang besi 35,000.00 4

0.455 OH Kepala Tukang 40,000.00 1

Page 14: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 14/45

0 208 OH M d 35 000 00

6.42 1 m3 Membuat balok Beton Bertulang (150kg besi + bekesting) 2,65

6.42.1 Bahan 2,35

0.32 m3 kayu terentang 500,000.00 16

3.200 kg paku biasa 2" - 5" 7,500.00 2

1.600 ltr Minyak bekesting 18,000.00 2

150.000 kg besi beton polos 6,000.00 90

2.250 kg kawat beton 7,500.00 1

323.000 btg Portland Cement 675.00 210.520 m3 Pasir beton 120,000.00 6

0.780 m3 Koral beton 120,000.00 9

0.120 m3 kayu balok 750,000.00 9

2.800 lbr plywood 9 mm 136,000.00 38

32.000 btg dolken diameter 8 / 4 m 12,000.00 38

6.42.2 Tenaga 29

5.800 OH Pekerja 25,000.00 14

0.350 OH Tukang batu 35,000.00 1

2.800 OH Tukang kayu 35,000.00 9

1.050 OH Tukang besi 35,000.00 3

0.042 OH Kepala Tukang 40,000.00

0.019 OH Mandor 35,000.00

6.43 1 m3 Membuat dinding Beton Bertulang (150kg besi + bekesting) 2,556.43.1 Bahan 2,25

0.24 m3 kayu terentang 500,000.00 12

3.200 kg paku biasa 2" - 5" 7,500.00 2

1.600 ltr Minyak bekesting 18,000.00 2

150.000 kg besi beton polos 6,000.00 90

2.250 kg kawat beton 7,500.00 1

323.000 btg Portland Cement 675.00 21

0.520 m3 Pasir beton 120,000.00 6

0.780 m3 Koral beton 120,000.00 9

0.160 m3 kayu balok 750,000.00 12

2.800 lbr plywood 9 mm 136,000.00 38

24.000 btg dolken diameter 8 / 4 m 12,000.00 28

6.43.2 Tenaga 30

5.600 OH Pekerja 25,000.00 140.350 OH Tukang batu 35,000.00 1

2.640 OH Tukang kayu 35,000.00 9

1.050 OH Tukang besi 35,000.00 3

0.400 OH Kepala Tukang 40,000.00 1

0.193 OH Mandor 35,000.00

6.44 1 m3 Membuat tangga Beton Bertulang (200kg besi + bekesting) 2,65

6.44.1 Bahan 2,35

0.25 m3 kayu terentang 500,000.00 12

3.000 kg paku biasa 2" - 5" 7,500.00 2

1.200 ltr Minyak bekesting 18,000.00 2

200.000 kg besi beton polos 6,000.00 1,20

3.000 kg kawat beton 7,500.00 2

323.000 btg Portland Cement 675.00 21

0.520 m3 Pasir beton 120,000.00 60.780 m3 Koral beton 120,000.00 9

0.105 m3 kayu balok 750,000.00 7

2.500 lbr plywood 9 mm 136,000.00 34

14.000 btg dolken diameter 8 / 4 m 12,000.00 16

6.44.2 Tenaga 30

5.600 OH Pekerja 25,000.00 14

0.350 OH Tukang batu 35,000.00 1

2.300 OH Tukang kayu 35,000.00 8

1.400 OH Tukang besi 35,000.00 4

0.405 OH Kepala Tukang 40,000.00 1

0.202 OH Mandor 35,000.00

6.45 1 m' Membuat Kolom Penguat Beton Bertulang (11 x 11) cm 3

6.45.1 Bahan 2

0.002 m3 kayu terentang 500,000.00

0.010 kg paku biasa 2" - 5" 7,500.00

Page 15: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 15/45

6.45.2 Tenaga

0.060 OH Pekerja 25,000.00

0.020 OH Tukang batu 35,000.00

0.020 OH Tukang kayu 35,000.00

0.002 OH Tukang besi 35,000.00

0.006 OH Kepala Tukang 40,000.00

0.003 OH Mandor 35,000.00

6.46 1 m' Membuat Ring balk Beton Bertulang (10 x 15) cm 3

6.46.1 Bahan 3

0.003 m3 kayu albasia 500,000.00

0.020 kg paku biasa 2" - 5" 7,500.00

3.600 kg besi beton polos 6,000.00 2

0.050 kg kawat beton 7,500.00

5.500 kg Portland Cement 675.00

0.009 m3 Pasir beton 120,000.00

0.015 m3 Koral beton 120,000.00

6.46.2 Tenaga

0.100 OH Pekerja 25,000.00

0.033 OH Tukang batu 35,000.00

0.033 OH Tukang kayu 35,000.00

0.033 OH Tukang besi 35,000.000.010 OH Kepala Tukang 40,000.00

0.005 OH Mandor 35,000.00

7 03-3436-2002 PEKERJAAN PENUTUP ATAP

6.1 1 m2 Pasang Atap Genteng Plentong Kecil 2

6.1.1 Bahan 2

25.000 bh Genteng Plentong 800.00 2

6.1.2 Tenaga

0.150 OH Pekerja 25,000.00

0.075 OH Tukang Kayu 35,000.00

0.008 OH Kepala tukang 40,000.00

0.008 OH Mandor 35,000.00

6.2 1 m2 Pasang Atap Genteng Kodok / Glasur 5

6.2.1 Bahan 4

25.000 bh Genteng kodok / glasur 1,800.00 4

6.2.2 Tenaga

0.150 OH Pekerja 25,000.00

0.075 OH Tukang Kayu 35,000.00

0.008 OH Kepala tukang 40,000.00

0.008 OH Mandor 35,000.00

6.3 1 m2 Pasang Atap Genteng Plentong super / besar 3

6.3.1 Bahan 3

12.000 bh Genteng plentong super / besar 2,600.00 3

6.3.2 Tenaga 0.150 OH Pekerja 25,000.00

0.060 OH Tukang Kayu 35,000.00

0.006 OH Kepala tukang 40,000.00

0.008 OH Mandor 35,000.00

6.4 1 m' Pasang Genteng bubung plentong 3

6.4.1 Bahan 1

5.000 bh Genteng bubung plentong 1,550.00

8.000 kg Portland cement 675.00

0.032 m3 Pasir pasang 90,000.00

6.4.2 Tenaga 1

0.400 OH Pekerja 25,000.00 1

0.200 OH Tukang Kayu 35,000.00

0.020 OH Kepala tukang 40,000.000.002 OH Mandor 35,000.00

Page 16: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 16/45

6 5 1 ' P G t b b K d k / l 38

6.5.2 Tenaga 1

0.400 OH Pekerja 25,000.00 1

0.200 OH Tukang Kayu 35,000.00

0.020 OH Kepala tukang 40,000.00

0.002 OH Mandor 35,000.00

6.6 1 m' Pasang Genteng bubung Plentong besar 42

6.6.1 Bahan 24.000 bh Genteng bubung plentong besar 4,000.00 1

8.000 kg Portland cement 675.00

0.032 m3 Pasir pasang 90,000.00

6.6.2 Tenaga 1

0.400 OH Pekerja 25,000.00 1

0.200 OH Tukang Kayu 35,000.00

0.020 OH Kepala tukang 40,000.00

0.002 OH Mandor 35,000.00

6.9 1 m2 Pasang Atap Asbes Gelombang (2.25 x 0.92)m x 5 mm 4

6.9.1 Bahan 3

0.600 lbr Asbes Gelombang 56,250.00 33

0.120 kg Paku pancing 60 x 230 11,000.00

6.9.2 Tenaga

0.140 OH Pekerja 25,000.00 3

0.075 OH Tukang Kayu 35,000.00

0.008 OH Kepala tukang 40,000.00

0.008 OH Mandor 35,000.00

6.10 1 m2 Pasang Atap Asbes Gelombang (2.00 x 0.92)m x 5 mm 4

6.10.1 Bahan 3

0.600 lbr Asbes Gelombang 56,250.00 33

0.120 kg Paku pancing 60 x 230 11,000.00

6.10.2 Tenaga

0.140 OH Pekerja 25,000.00 3

0.070 OH Tukang Kayu 35,000.00

0.007 OH Kepala tukang 40,000.000.007 OH Mandor 35,000.00

6.12 1 m2 Pasang Atap Asbes Gelombang (3.00 x 1.05)m x 4 mm 27

6.12.1 Bahan 2

0.350 lbr Asbes Gelombang 56,250.00 1

0.120 kg Paku pancing 60 x 230 11,000.00

6.12.2 Tenaga

0.140 OH Pekerja 25,000.00 3

0.070 OH Tukang Kayu 35,000.00

0.007 OH Kepala tukang 40,000.00

0.007 OH Mandor 35,000.00

6.15 1 m2 Pasang Atap Asbes Gelombang (2.10 x 1.05)m x 4 mm 36

6.15.1 Bahan 30.510 lbr Asbes Gelombang 56,250.00 2

0.120 kg Paku pancing 60 x 230 11,000.00

6.15.2 Tenaga

0.140 OH Pekerja 25,000.00 3

0.067 OH Tukang Kayu 35,000.00

0.007 OH Kepala tukang 40,000.00

0.007 OH Mandor 35,000.00

6.30 1 m2 Pasang Atap genteng beton 3

6.30.1 Bahan 2

11.000 bh Genteng beton standard 2,000.00 2

0.030 kg Paku biasa 2" - 5" 7,500.00

6.30.2 Tenaga 0.200 OH Pekerja 25,000.00

0.100 OH Tukang Kayu 35,000.00 3

Page 17: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 17/45

OH K l k

6.33.2 Tenaga 1

0.166 OH Pekerja 25,000.00 4

0.250 OH Tukang Kayu 35,000.00 8

0.025 OH Kepala tukang 40,000.00

0.008 OH Mandor 35,000.00

6.34 1 m' Pasang Nok Genteng beton 4

6.34.1 Bahan 23.500 bh Nok Genteng beton 2,500.00 8

0.050 kg Paku biasa 2" - 5" 7,500.00

10.800 kg Portland cement 675.00 7

0.032 m3 Pasir pasang 90,000.00 2

1.000 kg semen warna 3,500.00 3

6.34.2 Tenaga 18

0.400 OH Pekerja 25,000.00 10

0.200 OH Tukang Kayu 35,000.00 7

0.020 OH Kepala tukang 40,000.00

0.020 OH Mandor 35,000.00

6.37 1 m' Pasang Nok sirap 23

6.37.1 Bahan 1

0.400 lbr seng plat 3" x 6" BJLS 28 14,000.00 50.060 kg Paku biasa 1/2" - 1" 7,500.00

0.500 kg Paku biasa 2" - 5" 7,500.00 3

0.004 m3 kayu kamfer papan tebal 6 cm 114,000.00

6.37.2 Tenaga 1

0.125 OH Pekerja 25,000.00 3

0.250 OH Tukang Kayu 35,000.00 8

0.025 OH Kepala tukang 40,000.00

0.006 OH Mandor 35,000.00

6.38 1 m2 Pasang atap seng gelombang 34

6.38.1 Bahan 28

0.700 lbr Seng gelombang 3" x 6" BJLS 28 39,000.00 27

0.200 kg Paku biasa 1/2" - 1" 7,500.00

6.38.2 Tenaga

0.120 OH Pekerja 25,000.00 3

0.060 OH Tukang Kayu 35,000.00 2

0.006 OH Kepala tukang 40,000.00

0.006 OH Mandor 35,000.00

6.39 1 m' Pasang atap Nok Seng 1

6.39.1 Bahan

0.300 lbr Seng plat 3" x 6" BJLS 28 14,000.00 4

0.040 kg Paku biasa 1/2" - 1" 7,500.00

6.39.2 Tenaga

0.150 OH Pekerja 25,000.00 3

0.070 OH Tukang Kayu 35,000.00 2

0.008 OH Kepala tukang 40,000.000.006 OH Mandor 35,000.00

6.42 1 m2 Pasang Allumunium Foil / Sisalation 12

6.42.1 Bahan

1.050 m2 Allumunium foil / Sisalation 4,500.00 4

0.120 kg Paku pancing 60 x 230 11,000.00

6.42.2 Tenaga

0.150 OH Pekerja 25,000.00 3

0.050 OH Tukang Kayu 35,000.00

0.005 OH Kepala tukang 40,000.00

0.008 OH Mandor 35,000.00

8 03-3436-2002 PEKERJAAN LANGIT-LANGIT

6.1 1 m2 Langit-langit asbes (1.00 x 1.00) cm, tebal 6 mm 102

6.1.1 Bahan 9

Page 18: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 18/45

1 1 Lb Pl b b l 6 90 000 00 99

0.002 OH Mandor 35,000.00

6.5 1 m2 Langit-langit akustik (30 x 30) cm 4

6.5.1 Bahan 34

11.5 Lbr Akustik Uk. 30 x 30 cm 3,000.00 34

0.05 kg Paku 7,500.00

6.5.2 Tenaga 6

0.060 OH Pekerja 25,000.000.120 OH Tukang Kayu 35,000.00 4

0.012 OH Kepala tukang 40,000.00

0.003 OH Mandor 35,000.00

6.8 1 m2 Langit-langit Playwood (30 x 60) cm tebal 4mm 29

6.8.1 Bahan 23

0.36 Lbr Plywood 4" x 8" x 4 mm 64,000.00 23

0.03 kg Paku 7,500.00

6.8.2 Tenaga 5

0.070 OH Pekerja 25,000.00

0.100 OH Tukang Kayu 35,000.00 3

0.010 OH Kepala tukang 40,000.00

0.004 OH Mandor 35,000.00

6.11 1 m2 Langit-langit Playwood (60 x 120) cm tebal 6mm 29

6.11.1 Bahan 24

0.375 Lbr Plywood 4" x 8" x 6 mm 64,000.00 24

0.03 kg Paku 7,500.00

6.11.2 Tenaga 5

0.070 OH Pekerja 25,000.00

0.100 OH Tukang Kayu 35,000.00 3

0.010 OH Kepala tukang 40,000.00

0.004 OH Mandor 35,000.00

6.14 1 m2 Langit-langit Lat Kayu Jati 317

6.14.1 Bahan 288

0.024 m3 kayu jati papan 12,000,000.00 288

0.01 kg Paku 7,500.000.05 kg Paku Sekrup 14,000.00

6.14.2 Tenaga 28

0.200 OH Pekerja 25,000.00 5

0.600 OH Tukang Kayu 35,000.00 2

0.060 OH Kepala tukang 40,000.00 2

0.010 OH Mandor 35,000.00

6.17 1 m2 Langit-langit Lat Softboard 50

6.17.1 Bahan 3

0.35 m3 Softboard 4" x 8" x 4 mm 90,000.00 3

0.03 kg Paku biasa 7,500.00

6.17.2 Tenaga 19

0.600 OH Pekerja 25,000.00 150.100 OH Tukang Kayu 35,000.00 3

0.010 OH Kepala tukang 40,000.00

0.003 OH Mandor 35,000.00

6.19 1 m2 List langit-langit kayu profil 7

6.19.1 Bahan 4

1.1 m' list kayu profil 3,700.00 4

0.01 kg Paku biasa 7,500.00

6.19.2 Tenaga 3

0.050 OH Pekerja 25,000.00

0.050 OH Tukang Kayu 35,000.00

0.005 OH Kepala tukang 40,000.00

0.003 OH Mandor 35,000.00

6.20 1 m2 Langit-langit Asbes (1 x 1)m tebal 3,2 mm rangka kamfer 85

6.20.1 Bahan 68

Page 19: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 19/45

0.032 OH Kepala tukang 40,000.00

0.009 OH Mandor 35,000.00

6.21 1 m2 Langit-langit plywood 4 mm dan rangka kayu kamfer 157

6.21.1 Bahan 13

0.023 m' kayu kamfer 4,750,000.00 109

0.06 kg Paku biasa 7,500.00

0.39 lbr plywood 4" x 8" x 4 mm 64,000.00 24

6.21.2 Tenaga 20.27 OH Pekerja 25,000.00 6

0.4 OH Tukang Kayu 35,000.00 14

0.04 OH Kepala tukang 40,000.00

0.0135 OH Mandor 35,000.00

6.24 1 m2 Langit-langit gypsumboard, tebal 9 mm 22

6.24.1 Bahan 1

0.364 lbr gypsumboard 45,000.00 16

0.11 kg paku sekrup 14,000.00

6.24.2 Tenaga

0.1 OH Pekerja 25,000.00 2

0.05 OH Tukang Kayu 35,000.00

0.005 OH Kepala tukang 40,000.00

0.005 OH Mandor 35,000.00

9 03-3436-2002 PEKERJAAN SANITASI

6.1 1 Unit Memasang Klosed Duduk / Mono Blok 412

6.1.1 Bahan 28

1.000 bh Klosed duduk / mono blok 270,000.00 270

0.060 Kelengkapan 6% dari harga klosed 270,000.00 16

6.1.2 Tenaga 12

3.300 OH Pekerja 25,000.00 82

1.100 OH Tukang batu 35,000.00 38

0.001 OH Kepala tukang 40,000.00

0.160 OH Mandor 35,000.00 5

6.2 1 Unit Memasang Klosed jongkok porselen 2286.2.1 Bahan 8

1.000 bh Klosed Jongkok 80,000.00 80

6.000 kg Portland sement 675.00 4

0.010 m3 Pasir pasang 90,000.00

6.2.2 Tenaga 14

1.000 OH Pekerja 25,000.00 25

1.500 OH Tukang batu 35,000.00 52

1.500 OH Kepala tukang 40,000.00 60

0.160 OH Mandor 35,000.00 5

6.4 1 Unit Memasang Urinoir 429

6.4.1 Bahan 36

1.000 bh Urinoir 275,000.00 275

0.300 - Perlengkapan 30% harga urinoir 275,000.00 826.000 kg Portland sement 675.00 4

0.010 m3 Pasir pasang 90,000.00

6.4.2 Tenaga 6

1.000 OH Pekerja 25,000.00 25

1.000 OH Tukang batu 35,000.00 35

0.100 OH Kepala tukang 40,000.00 4

0.100 OH Mandor 30,000.00 3

6.5 1 Unit Memasang wastafel 569

6.5.1 Bahan 52

1.000 bh wastafel meja oval 400,000.00 400

0.300 - Perlengkapan 30% harga wastafel 400,000.00 120

6.000 kg Portland sement 675.00 4

0.010 m3 Pasir pasang 90,000.00

6.5.2 Tenaga 4

Page 20: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 20/45

1 200 OH P k j 25 000 00 30

6.8 1 Unit Memasang Bak mandi batu bata Vol. 0.30m3 53

6.8.1 Bahan 25

0.400 m3 Batu bata 150,000.00 6

120.000 kg Portland cement 675.00 8

0.300 kg Pasir pasang 90,000.00 2

360.000 bh Porselen 11 x 11 cm 191.92 6

6.000 kg Semen nat 3,500.00 2

6.8.2 Tenaga 27

6.000 OH Pekerja 25,000.00 15

3.000 OH Tukang batu 35,000.00 10

0.300 OH Kepala tukang 40,000.00 1

0.300 OH Mandor 35,000.00 1

6.14 1 m' Memasang Pipa Beton Ø15 cm - 20 cm 3

6.14.1 Bahan 2

1.100 bh Pipa beton 16,000.00 1

0.027 m3 Batu bata 150,000.00

0.056 m3 Pasir pasang 90,000.00

0.680 kg Portland cement 675.00

0.024 m3 Pasir urug 60,000.00

6.14.2 Tenaga 0.140 OH Pekerja 25,000.00

0.070 OH Tukang batu 35,000.00

0.007 OH Kepala tukang 40,000.00

0.007 OH Mandor 35,000.00

6.15 1 m' Memasang Pipa Beton Ø30 cm - 100 cm 14

6.15.1 Bahan 12

1.100 bh Pipa beton 26,000.00 2

0.550 m3 Batu bata 150,000.00 8

0.061 m3 Pasir pasang 90,000.00

10.300 kg Portland cement 675.00

0.069 m3 Pasir urug 60,000.00

6.15.2 Tenaga 1

0.380 OH Pekerja 25,000.000.190 OH Tukang batu 35,000.00

0.019 OH Kepala tukang 40,000.00

0.019 OH Mandor 35,000.00

6.20 1 m' Memasang Pipa Galvanis Ø3/4" 4

6.20.1 Bahan 4

1.200 m' pipa galvanis 26,000.00 3

0.350 Perlengkapan 35% harga pipa 26,000.00

6.20.2 Tenaga

0.054 OH Pekerja 25,000.00

0.090 OH Tukang ledeng 30,000.00

0.009 OH Kepala tukang 40,000.00

0.027 OH Mandor 35,000.00

6.23 1 m' Memasang Pipa Galvanis Ø3" 6

6.23.1 Bahan 5

1.200 m' pipa galvanis 35,500.00 4

0.350 Perlengkapan 35% harga pipa 35,500.00 1

6.23.2 Tenaga

0.108 OH Pekerja 25,000.00

0.180 OH Tukang ledeng 30,000.00

0.018 OH Kepala tukang 40,000.00

0.0054 OH Mandor 35,000.00

6.24 1 m' Memasang Pipa Galvanis Ø4" 9

6.24.1 Bahan 8

1.200 m' pipa galvanis 54,166.67 6

0.350 Perlengkapan 35% harga pipa 54,166.67 1

6.24.2 Tenaga 1

Page 21: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 21/45

g

1.200 m' pipa PVC 3,875.00

0.350 Perlengkapan 35% harga pipa 3,875.00

6.25.2 Tenaga

0.036 OH Pekerja 25,000.00

0.060 OH Tukang ledeng 30,000.00

0.006 OH Kepala tukang 40,000.00

0.0018 OH Mandor 35,000.00

6.29 1 m' Memasang Pipa PVC tipe AW Ø2" 16.29.1 Bahan 1

1.200 m' pipa PVC 9,166.67 1

0.350 Perlengkapan 35% harga pipa 9,166.67

6.29.2 Tenaga

0.054 OH Pekerja 25,000.00

0.090 OH Tukang ledeng 30,000.00

0.009 OH Kepala tukang 40,000.00

0.0027 OH Mandor 35,000.00

6.31 1 m' Memasang Pipa PVC tipe AW Ø3" 3

6.31.1 Bahan 3

1.200 m' pipa PVC 20,000.00 2

0.350 Perlengkapan 35% harga pipa 20,000.00

6.31.2 Tenaga

0.081 OH Pekerja 25,000.00

0.135 OH Tukang ledeng 30,000.00

0.014 OH Kepala tukang 40,000.00

0.0041 OH Mandor 35,000.00

6.33 1 bh Memasang Bak Cuci piring Stainles steel 27

6.33.1 Bahan 26

1.000 bh Bak cuci stainles steel 130,000.00 13

1.000 set Water drain dan Assesoris 130,000.00 13

6.33.2 Tenaga 1

0.030 OH Pekerja 25,000.00

0.300 OH Tukang ledeng 30,000.00

0.030 OH Kepala tukang 40,000.000.0015 OH Mandor 35,000.00

6.35 1 bh Memasang kran Ø3/4" atau Ø1/2"

6.35.1 Bahan

1.000 bh kran air 6,000.00

0.025 set Seal tape 600.00

6.35.2 Tenaga

0.010 OH Pekerja 25,000.00

0.100 OH Tukang ledeng 30,000.00

0.010 OH Kepala tukang 40,000.00

0.005 OH Mandor 35,000.00

6.36 1 bh Memasang Floor drain

6.36.1 Bahan 1.000 bh Floor drain 5,000.00

6.36.2 Tenaga

0.010 OH Pekerja 25,000.00

0.100 OH Tukang batu 35,000.00

0.010 OH Kepala tukang 40,000.00

0.005 OH Mandor 35,000.00

9 03-3436-2002 PEKERJAAN BESI DAN ALUMUNIUM

6.1 1 Kg Pasang Rangka Atap Baja

6.1.1 Bahan

1.100 kg Besi Profil WF 5,500.00

0.080 kg Meni Besi 12,500.00

6.1.2 Tenaga

0.060 OH Pekerja 25,000.00

Page 22: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 22/45

6.2.2 Tenaga 4

0.650 OH Pekerja 25,000.00 1

0.650 OH Tukang besi konstruksi 35,000.00 2

0.065 OH kepala tukang 40,000.00

0.0320 OH Mandor 35,000.00

6.6 1 m2 Pasang Lipat Pintu Besi 31

6.6.1 Bahan 251.000 m2 Pintu lipat besi 250,000.00 25

6.6.2 Tenaga 6

1.050 OH Pekerja 25,000.00 2

1.050 OH Tukang besi konstruksi 35,000.00 3

0.105 OH kepala tukang 40,000.00

0.0052 OH Mandor 35,000.00

6.8 1 m2 Pasang Rolling Door 22

6.8.1 Bahan 14

1.000 m2 Roll Door 145,000.00 14

6.8.2 Tenaga 8

1.050 OH Pekerja 25,000.00 2

1.500 OH Tukang besi konstruksi 35,000.00 50.105 OH kepala tukang 40,000.00

0.0052 OH Mandor 35,000.00

6.9 1 m2 Pasang pintu Alumunium 27

6.9.1 Bahan 19

1.000 m2 pintu alumunium 190,000.00 19

6.9.2 Tenaga 8

1.050 OH Pekerja 25,000.00 2

1.500 OH Tukang besi konstruksi 35,000.00 5

0.105 OH kepala tukang 40,000.00

0.0052 OH Mandor 35,000.00

6.12 1 m2 Pasang teralis besi 19

6.12.1 Bahan 1211.500 m' besi strip 2 x 3 10,883.33 12

6.12.2 Tenaga 6

1.200 OH Pekerja 25,000.00 3

1.200 OH Tukang las 30,000.00 3

0.012 OH kepala tukang 40,000.00

0.0060 OH Mandor 35,000.00

6.13 1 m2 Pasang Kawat Harmonika 3

6.13.1 Bahan 2

1.100 m2 Kawat harmonika 19,000.00 2

0.020 kg Paku biasa 1/2" - 1" 7,500.00

0.0018 m3 Kayu kamfer, papan 4,750,000.00

6.13.2 Tenaga

0.100 OH Pekerja 25,000.00

0.100 OH Tukang kayu 35,000.00

0.010 OH kepala tukang 40,000.00

0.0005 OH Mandor 35,000.00

6.14 1 m2 Pasang Kawat nyamuk 2

6.14.1 Bahan 1

1.100 m2 Kawat nyamuk nylon 9,000.00

0.020 kg Paku biasa 1/2" - 1" 7,500.00

0.0018 m3 Kayu kamfer, papan 4,750,000.00

6.14.2 Tenaga

0.100 OH Pekerja 25,000.00

0.100 OH Tukang kayu 35,000.00

0.010 OH kepala tukang 40,000.00

0.0005 OH Mandor 35,000.00

Page 23: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 23/45

6.17.2 Tenaga 1

0.200 OH Pekerja 25,000.00

0.200 OH Tukang kayu 35,000.00

0.020 OH kepala tukang 40,000.00

0.001 OH Mandor 35,000.00

6.18 1 m' Pasang Talang Datar, Seng BJLS 28 7

6.18.1 Bahan 50.500 lbr Seng plat 3" x 6" BJLS 28 14,000.00

0.015 kg Paku biasa 1/2" - 1" 7,500.00

0.0096 m3 Kayu kamfer, papan 4,750,000.00 4

0.250 kg Flincote / meni besi 28,000.00

6.18.2 Tenaga 1

0.150 OH Pekerja 25,000.00

0.400 OH Tukang kayu 35,000.00 1

0.025 OH kepala tukang 40,000.00

0.00125 OH Mandor 35,000.00

6.19 1 m' Pasang Talang Miring, Seng BJLS 28 11

6.19.1 Bahan 10

0.500 lbr Seng plat 3" x 6" BJLS 28 14,000.00

0.015 kg Paku biasa 1/2" - 1" 7,500.000.0190 m3 Kayu kamfer, papan 4,750,000.00 9

0.300 kg Flincote / meni besi 12,500.00

6.19.2 Tenaga 1

0.040 OH Pekerja 25,000.00

0.400 OH Tukang kayu 35,000.00 1

0.025 OH kepala tukang 40,000.00

0.00125 OH Mandor 35,000.00

6.20 1 m' Pasang Talang 1/2 lingkaran D10 cm, seng BJLS 28 11

6.20.1 Bahan 10

0.300 lbr Seng plat 3" x 6" BJLS 28 14,000.00

0.100 kg Paku biasa 1/2" - 1" 7,500.00

0.0190 m3 Kayu kamfer, papan 4,750,000.00 9

0.500 kg Flincote / meni besi 12,500.00

6.20.2 Tenaga 1

0.150 OH Pekerja 25,000.00

0.250 OH Tukang kayu 35,000.00

0.025 OH kepala tukang 40,000.00

0.00125 OH Mandor 35,000.00

10 03-3436-2002 PEKERJAAN KUNCI DAN KACA

6.2 1 bh Pasang Kunci Tanam biasa 4

6.2.1 Bahan 3

1.000 bh Kunci Tanam biasa 30,000.00 3

6.2.2 Tenaga 1

0.010 OH Pekerja 25,000.000.500 OH Tukang Kayu 35,000.00 1

0.010 OH Kepala tukang 40,000.00

0.005 OH Mandor 35,000.00

6.3 1 bh Pasang Kunci Tanam kamar Mandi 5

6.3.1 Bahan 3

1.000 bh Kunci Tanam kamar mandi 35,000.00 3

6.3.2 Tenaga 1

0.005 OH Pekerja 25,000.00

0.500 OH Tukang Kayu 35,000.00 1

0.005 OH Kepala tukang 40,000.00

0.0025 OH Mandor 35,000.00

6.4 1 bh Pasang Kunci Selinder 5

6.4.1 Bahan 3

1.000 bh Kunci Selinder 35,000.00 3

Page 24: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 24/45

,

6.5 1 bh Pasang Engsel Pintu 1

6.5.1 Bahan

1.000 bh Engsel Pintu 6,000.00

6.5.2 Tenaga

0.015 OH Pekerja 25,000.00

0.150 OH Tukang Kayu 35,000.00

0.015 OH Kepala tukang 40,000.000.00075 OH Mandor 35,000.00

6.6 1 bh Pasang Engsel Jendela Kupu-kupu

6.6.1 Bahan

1.000 bh Engsel jendela 2,500.00

6.6.2 Tenaga

0.010 OH Pekerja 25,000.00

0.100 OH Tukang Kayu 35,000.00

0.010 OH Kepala tukang 40,000.00

0.005 OH Mandor 35,000.00

6.7 1 bh Pasang Engsel Angin 2

6.7.1 Bahan 1

1.000 bh Engsel Angin 15,000.00 1

6.7.2 Tenaga

0.020 OH Pekerja 25,000.00

0.200 OH Tukang Kayu 35,000.00

0.020 OH Kepala tukang 40,000.00

0.010 OH Mandor 35,000.00

6.9 1 bh Pasang Kait Angin

6.9.1 Bahan

1.000 bh kait Angin 2,000.00

6.9.2 Tenaga

0.015 OH Pekerja 25,000.00

0.150 OH Tukang Kayu 35,000.00

0.015 OH Kepala tukang 40,000.000.00075 OH Mandor 35,000.00

6.10 1 bh Pasang Door Closer 2

6.10.1 Bahan

1.000 bh Door Closer 7,500.00

6.10.2 Tenaga 2

0.050 OH Pekerja 25,000.00

0.500 OH Tukang Kayu 35,000.00 1

0.050 OH Kepala tukang 40,000.00

0.0025 OH Mandor 35,000.00

6.11 1 bh Pasang Kunci Selot 1

6.11.1 Bahan

1.000 bh kunci Selot 3,500.00

6.11.2 Tenaga

0.020 OH Pekerja 25,000.00

0.200 OH Tukang Kayu 35,000.00

0.020 OH Kepala tukang 40,000.00

0.001 OH Mandor 35,000.00

6.13 1 bh Pasang Door Stop 1

6.13.1 Bahan

1.000 bh Door Stop 7,500.00

6.13.2 Tenaga

0.010 OH Pekerja 25,000.00

0.100 OH Tukang Kayu 35,000.000.010 OH Kepala tukang 40,000.00

0.0005 OH Mandor 35,000.00

Page 25: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 25/45

6.14 1 bh Pasang Rel Pintu Dorong 4

6.14.1 Bahan 1

1.000 bh Rel pintu Dorong 15,000.00 1

6.14.2 Tenaga 2

0.060 OH Pekerja 25,000.00

0.600 OH Tukang Kayu 35,000.00 2

0.060 OH Kepala tukang 40,000.00

0.003 OH Mandor 35,000.00

6.15 1 bh Pasang Kunci Lemari 1

6.15.1 Bahan

1.000 bh Kunci Lemari 3,500.00

6.15.2 Tenaga 1

0.025 OH Pekerja 25,000.00

0.250 OH Tukang Kayu 35,000.00

0.025 OH Kepala tukang 40,000.00

0.00125 OH Mandor 35,000.00

6.16 1 m2 Pasang Kaca Tebal 3 mm 5

6.16.1 Bahan 4

1.100 m2 Kaca tebal 3 mm 40,000.00 4

6.16.2 Tenaga

0.015 OH Pekerja 25,000.00

0.150 OH Tukang Kayu 35,000.00

0.015 OH Kepala tukang 40,000.00

0.00075 OH Mandor 35,000.00

6.17 1 m2 Pasang Kaca Tebal 5 mm 6

6.17.1 Bahan 5

1.100 m2 Kaca tebal 5 mm 50,000.00 5

6.17.2 Tenaga

0.015 OH Pekerja 25,000.00

0.150 OH Tukang Kayu 35,000.00

0.015 OH Kepala tukang 40,000.00

0.00075 OH Mandor 35,000.00

6.20 1 m2 Pasang Kaca cermin Tebal 5 mm 8

6.20.1 Bahan 8

1.100 m2 Kaca cermin 75,000.00 8

6.20.2 Tenaga

0.015 OH Pekerja 25,000.00

0.150 OH Tukang Kayu 35,000.00

0.015 OH Kepala tukang 40,000.00

0.00075 OH Mandor 35,000.00

10 03-3436-2002 PEKERJAAN PENUTUP LANTAI DAN DINDING

6.3 1 m2 Pasang Lantai Ubin PC Abu-abu Uk. 20 x 20 cm 3

6.3.1 Bahan 2

26.500 bh Ubin abu-abu 20 x 20 cm 720.00 1

10.400 kg Portland Cement 675.00

0.0135 m3 Pasir pasang 90,000.00

6.3.2 Tenaga 1

0.270 OH Pekerja 25,000.00

0.130 OH Tukang batu 35,000.00

0.013 OH Kepala tukang 40,000.00

0.0135 OH Mandor 35,000.00

6.9 1 m2 Pasang Lantai Ubin Granito Uk. 40 x 40 cm 1,30

6.9.1 Bahan 1,29

6.930 bh Ubin granito 40 x 40 cm 185,000.00 1,28

9.800 kg Portland Cement 675.000.0215 m3 Pasir pasang 90,000.00

1.300 kg Semen warna 3,500.00

Page 26: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 26/45

6.19 1 m' Pasang Plint Ubin PC Warna Uk. 10 x 20 cm 3

6.19.1 Bahan 2

5.300 bh Plint ubin PC Warna 10 x 20 cm 5,000.00 2

1.200 kg Portland Cement 675.00

0.0030 m3 Pasir pasang 90,000.00

0.190 kg Semen warna 3,500.00

6.19.2 Tenaga

0.060 OH Pekerja 25,000.000.030 OH Tukang batu 35,000.00

0.003 OH Kepala tukang 40,000.00

0.003 OH Mandor 35,000.00

6.44 1 m2 Pasang Lantai Keramik 20 x 20 cm 7

6.44.1 Bahan 4

25.000 bh Ubin keramik 20 x 20 1,280.00 3

11.380 kg Portland Cement 675.00

0.0420 m3 Pasir pasang 90,000.00

1.500 kg Semen warna 3,500.00

6.44.2 Tenaga 3

0.620 OH Pekerja 25,000.00 1

0.350 OH Tukang batu 35,000.00 1

0.035 OH Kepala tukang 40,000.000.030 OH Mandor 35,000.00

6.47 1 m2 Pasang Lantai Keramik 30 x 30 cm 8

6.47.1 Bahan 5

10.000 bh Ubin keramik 30 x 30 3,333.33 3

11.380 kg Portland Cement 675.00

0.042 m3 Pasir pasang 90,000.00

1.500 kg Semen warna 3,500.00

6.47.2 Tenaga 3

0.620 OH Pekerja 25,000.00 1

0.350 OH Tukang batu 35,000.00 1

0.035 OH Kepala tukang 40,000.00

0.030 OH Mandor 35,000.00

6.56 1 m2 Pasang Lantai Parquet Jati 16

6.56.1 Bahan 13

1.050 m2 Parket jati 120,000.00 12

0.600 kg Lem Vynil 18,000.00 1

6.56.2 Tenaga 3

0.650 OH Pekerja 25,000.00 1

0.350 OH Tukang batu 35,000.00 1

0.035 OH Kepala tukang 40,000.00

0.0325 OH Mandor 35,000.00

6.66 1 m2 Pasang Dinding Keramik 10 x 20 cm 7

6.66.1 Bahan 4

50.000 bh keramik dinding 10 x 20 600.00 3

9.300 kg Portland Cement 675.00

0.018 m3 Pasir pasang 90,000.00

1.500 kg Semen warna 3,500.00

6.66.2 Tenaga 3

0.600 OH Pekerja 25,000.00 1

0.450 OH Tukang batu 35,000.00 1

0.045 OH Kepala tukang 40,000.00

0.030 OH Mandor 35,000.00

6.68 1 m2 Pasang Dinding Keramik 20 x 20 cm 6

6.68.1 Bahan 3

25.000 bh keramik dinding 20 x 20 920.00 2

9.300 kg Portland Cement 675.00

0.018 m3 Pasir pasang 90,000.00

1.500 kg Semen warna 3,500.00

6.68.2 Tenaga 3

Page 27: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 27/45

g

6.73 1 m2 Pasang Dinding Batu Paros 1,15

6.73.1 Bahan 1,12

1.050 m2 Batu paros 65,000.00 6

11.750 kg Portland Cement 90,000.00 1,05

0.035 m3 Pasir pasang 675.00

6.73.2 Tenaga 3

0.620 OH Pekerja 25,000.00 1

0.350 OH Tukang batu 35,000.00 10.035 OH Kepala tukang 40,000.00

0.030 OH Mandor 35,000.00

10 03-3436-2002 PEKERJAAN PENGECATAN

6.1 1 m2 Mengikis / Mengerok Permukaan Cat Tembok Lama

6.1.1 Bahan

0.050 kg Soda Api 12,000.00

6.1.2 Tenaga

0.150 OH Pekerja 25,000.00

0.0025 OH Mandor 35,000.00

6.2 1 m2 Mencuci bidang permukaan tembok yang pernah dicat

6.2.1 Bahan 0.050 kg sabun 9,000.00

6.2.2 Tenaga

0.150 OH Pekerja 25,000.00

0.0025 OH Mandor 35,000.00

6.3 1 m2 Mengerok karat cat lama permukaan baja dengan cara manual

6.3.1 Bahan

0.050 kg sabun 9,000.00

6.3.2 Tenaga

0.150 OH Pekerja 25,000.00

0.0025 OH Mandor 35,000.00

6.4 1 m2 Menyabun Permukaan tembok lama

6.4.1 Bahan

0.050 kg sabun 9,000.00

6.4.2 Tenaga

0.150 OH Pekerja 25,000.00

0.0025 OH Mandor 35,000.00

6.6 1 m2 Mendempul dan menggosok kayu

6.6.1 Bahan

0.080 kg Dempul jadi 10,000.00

0.020 kg Minyak cat 6,000.00

0.100 lbr Amplas 2,000.00

6.6.2 Tenaga

0.040 OH Pekerja 25,000.00

0.040 OH Tukang Cat 32,000.00

0.004 OH Kepala tukang 40,000.00

0.0025 OH Mandor 35,000.00

6.7 1 m2 Pengecatan bidang lama 1

6.7.1 Bahan

0.150 kg Plamir 10,000.00

0.170 kg Cat dasar 12,500.00

0.170 kg Cat penutup 25,000.00

6.7.2 Tenaga

0.070 OH Pekerja 25,000.00

0.075 OH Tukang Cat 32,000.00

0.0075 OH Kepala tukang 40,000.00

0.0025 OH Mandor 35,000.00

6.8 1 m2 Pengecatan bidang kayu baru (1 lap.plamir) 1

Page 28: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 28/45

6 8 e gecata b da g ayu ba u ( ap p a )

6.8.2 Tenaga

0.070 OH Pekerja 25,000.00

0.009 OH Tukang Cat 32,000.00

0.006 OH Kepala tukang 40,000.00

0.0025 OH Mandor 35,000.00

6.9 1 m2 Pengecatan bidang kayu baru (1 lap.plamir) 2

1 lap.cat dasar & 3 lap.cat penutup

6.9.1 Bahan 10.200 kg Cat meni 12,500.00

0.150 kg plamir kayu 10,000.00

0.170 kg cat dasar 12,500.00

0.350 kg cat penutup 2 kali 25,000.00

6.9.2 Tenaga

0.070 OH Pekerja 25,000.00

0.105 OH Tukang Cat 32,000.00

0.004 OH Kepala tukang 40,000.00

0.0025 OH Mandor 35,000.00

6.10 1 m2 Pelaburan Bidang kayu dengan teak Oil 1

6.10.1 Bahan

0.360 ltr Teak Oil 19,000.00

6.10.2 Tenaga

0.040 OH Pekerja 25,000.00

0.063 OH Tukang Cat 32,000.00

0.063 OH Kepala tukang 40,000.00

0.0025 OH Mandor 35,000.00

6.11 1 m2 Pelaburan bidang kayu dengan politur 1

6.11.1 Bahan 1

0.150 ltr politur 19,000.00

0.372 ltr Politur jadi 19,000.00

2.000 lbr Ampelas 2,000.00

6.11.2 Tenaga

0.070 OH Pekerja 25,000.00

0.060 OH Tukang Cat 32,000.000.016 OH Kepala tukang 40,000.00

0.0025 OH Mandor 35,000.00

6.12 1 m2 Pelaburan bidang kayu dengan cat residu dan ter

6.12.1 Bahan

0.350 ltr Residu atau ter 2,375.00

6.12.2 Tenaga

0.100 OH Pekerja 25,000.00

0.006 OH Mandor 35,000.00

6.13 1 m2 Pelaburan bidang kayu dengan vernis 1

6.13.1 Bahan

0.150 ltr vernis 19,000.00

0.050 kg Dempul 10,000.00

0.100 lbr Ampelas 2,000.00

0.010 bh Kuas 1,500.00

6.13.2 Tenaga

0.160 OH Pekerja 25,000.00

0.160 OH Tukang Cat 32,000.00

0.016 OH Kepala tukang 40,000.00

0.0025 OH Mandor 35,000.00

6.14 1 m2 Pengecat tembok baru (1 lap.plamir, 1

1 lap.cat dasar & 2 lap.cat penutup)

6.14.1 Bahan 1

0.100 kg plamir tembok 8,500.00

0.100 kg cat dasar 6,000.00

0.260 kg cat penutup 2 kali 48,500.00 1

6.14.2 Tenaga

Page 29: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 29/45

6.15 1 m2 Pengecat tembok lama (1 lap.plamir, 2 lap. Cat penutup) 1

6.15.1 Bahan

0.100 kg cat dasar 6,000.00

0.180 kg cat penutup 2 kali 48,500.00

6.15.2 Tenaga

0.028 OH Pekerja 25,000.00

0.042 OH Tukang Cat 32,000.00

0.0042 OH Kepala tukang 40,000.000.0025 OH Mandor 35,000.00

6.20 1 m2 Pengecat permukaan baja dengan meni besi

6.20.1 Bahan

0.100 kg meni besi 12,500.00

0.010 kg Perekat / lem 17,500.00

6.20.2 Tenaga

0.020 OH Pekerja 25,000.00

0.200 OH Tukang Cat 32,000.00

0.0020 OH Kepala tukang 40,000.00

0.0100 OH Mandor 35,000.00

6.21 1 m2 Pengecat permukaan baja dengan meni besi dan perancah 1

6.21.1 Bahan 0.100 kg meni besi 12,500.00

0.010 kg Perekat / lem 17,500.00

0.002 m3 Perancah kayu 500,000.00

6.21.2 Tenaga 1

0.250 OH Pekerja 25,000.00

0.225 OH Tukang Cat 32,000.00

0.0225 OH Kepala tukang 40,000.00

0.0075 OH Mandor 35,000.00

6.24 1 m2 Pengecat permukaan baja lapis seng (Galvanis) Secara 6

manual sistem 3 lapis. Cat konvensional dg tebal 200 µm

6.24.1 Bahan

0.110 kg Cat dasar 12,500.00

0.170 kg Cat antara 12,500.00

0.080 kg Cat penutup 28,500.00

6.24.2 Tenaga 5

0.500 OH Pekerja 25,000.00 1

0.800 OH Tukang Cat 32,000.00 2

0.3000 OH Kepala tukang 40,000.00 1

0.2000 OH Mandor 35,000.00

ANALISA HASIL PERHITUNGAN SENDIRI

1 Unit Pekerjaan Septictank (ST-1) 1,82

Bahan

5.8685 m3 Galian tanah 10,400.00 6

0.3990 m3 Urugan pasir 79,100.00 3

0.5985 m3 Anstamping 190,125.00 11

17.95 m2 Pas. Bata merah 1:3 tebal 1/2 bata 38,924.75 69

17.95 m2 Plesteran 1:3 16,784.00 30

0.572 m3 Cor beton campuran 1:2:3 362,275.00 20

33.80 kg Berat besi tulangan 6,853.50 23

1 set Pipa + Asesoris 180,000.00 18

1 bh Handle bak kontrol 2,000.00

1 Unit Pekerjaan Septictank Sederhana Burput (ST-2) 95

Bahan

4 m' Pengadaan buis beton Ø 70 cm + pasang 64,000.00 25

0.0785 m3 Urugan pasir 79,100.00

0.0393 m3 Rabat beton 1:3:5 362,275.00 1

12.56 m2 Plesteran 1:3 16,784.00 21

0.1539 m3 Cor beton campuran 1:2:3 362,275.00 5

33.80 kg Berat besi tulangan 6,853.50 23

Page 30: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 30/45

g g ,

1 m2 Pasang paving abu-abu / warna tanpa speci 5

Bahan 3

1.00 m2 Paving 30,000.00 3

0.10 m3 Pasir pasang 90,000.00

Tenaga 1

0.40 OH Pekerja 25,000.00 1

0.02 OH Mandor 35,000.00

0.02 OH Kepala Tukang 40,000.000.02 OH Tukang batu 35,000.00

1 m' Pasangan Kansteen Beton 9

Bahan 2

0.03 m3 Galian tanah 10,400.00

0.0075 m3 Pasir urug 60,000.00

1.00 m' Kansteen beton 22,500.00 2

Tenaga 6

0.30 OH Pekerja 25,000.00

1 m' Pasangan Got U-20 4

Bahan 1

0.0060 m3 Pasangan Bata 1:3 350,322.75

1.000 m3 Got U-20 16,000.00 1

Tenaga 2

1.00 OH Pekerja 25,000.00 2

1 m' Pasangan Got U-30 5

Bahan 2

0.0060 m3 Pasangan Bata 1:3 350,322.75

1.000 m3 Got U-30 26,000.00 2

Tenaga 2

1.00 OH Pekerja 25,000.00 2

1 m3 Bongkaran beton bertulang / dinding batu bata 17

Tenaga 17

6.667 OH Pekerja 25,000.00 16

0.033 OH Mandor 35,000.00

1 m2 Membongkar plesteran dinding

Tenaga

0.125 OH Pekerja 25,000.00

0.0125 OH Mandor 35,000.00

Page 31: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 31/45

Page 32: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 32/45

DAFTAR UPAH PEKERJA

Rp1 Pekerja Hari 25,000.00

2 Mandor Hari 35,000.00

3 Tukang Listrik Hari 35,000.00

4 Tukang Kayu Hari 35,000.00

5 Kepala Tukang kayu Hari 40,000.00

6 Tukang Batu Hari 35,000.00

7 Kepala Tukang Batu Hari 40,000.00

8 Tukang besi Hari 35,000.00

9 Kepala tukang besi Hari 40,000.00

10 Tukang Cat Hari 32,000.00

11 Kepala Tukang Cat Hari 40,000.00

12 Tukang Plitur Hari 32,500.0013 Tukang Jalan Hari 30,000.00

14 Tukang gali Hari 22,500.00

15 Tukang Ledeng Hari 30,000.00

16 Kepala Tukang Ledeng Hari 40,000.00

17 Tukang Las Hari 30,000.00

18 Kepala Tukang Las Hari 40,000.00

SatuanJenis UpahNoHarga Satuan

Page 33: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 33/45

DAFTAR HARGA BAHAN

Harga Satuan

Rp1 Batu kali

Bulat utuh m3 110,000.00Bulat belah m3 115,000.00

Pecah 10/15 m3 125,000.00

Pecah 5/7 m3 145,000.00

Pecah 3/5 m3 150,000.00

2 Kerikil

Timbun m3 65,000.00

Sawur / koral m3 80,000.00

Beton 0.5/1 m3 180,000.00

Beton 1/2 m3 160,000.00

Beton 2/3 m3 140,000.00

Biasa m3 120,000.00

tras giling m3 200,000.003 Batu Bata bh 225.00

4 Pasir urug m3 60,000.00

Pasir pasang m3 90,000.00

Pasir beton m3 120,000.00

5 Tanah padas m3 55,000.00

Tanah liat m3 40,000.00

6 Kapur pasang m3 115,000.00

Kapur semen merah m3 95,000.00

7 Portland cement

Holcim 40 kg kg 750.00

Holcim 50 kg kg 660.00

Cibinong 40 kg kg 687.50

Cibinong 50 kg kg 686.00

Semen putih 40 kg kg 1,125.00

Semen putih 50 kg kg 1,100.00

Semen warna kg 3,500.00

8 Sirap (100 lbr) pak 135,000.00

9 Genteng beton

Genteng beton warna standard bh 2,000.00

Genteng beton warna spesial bh 2,400.00

Genteng beton warna khusus bh 2,900.00

Kerpus beton warna standard bh 2,500.00

Kerpus beton warna spesial bh 3,500.00

Kerpus beton warna khusus bh 4,900.00

10 Genteng tanah liatVlaam bh 770.00

Kodok bh 800.00

Kodok glasur bh 1,800.00

Nok kerpus kodok bh 1,550.00

Nok kerpus kodok glasur bh 2,500.00

Plentong super besar bh 2,600.00

Nok kerpus plentong super bh 4,000.00

11 Genteng kaca

No Bahan Satuan

Page 34: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 34/45

Vlaam tebal 2mm bh 3,500.00

Vlaam tebal 3mm bh 4,500.00

Kodok tebal 2mm bh 4,000.00

Kodok tebal 3mm bh 4,500.00

12 Asbes Gelombang besar

200 cm x 102 cm x 5 mm bh 52,000.00

250 cm x 102 cm x 5 mm bh 68,000.00225 cm x 102 cm x 5 mm bh 56,250.00

200 cm x 102 cm x 6 mm bh 61,500.00

225 cm x 102 cm x 6 mm bh 67,500.00

250 cm x 102 cm x 6 mm bh 72,250.00

13 Asbes Gelombang kecil

150 cm x 105 cm x 4 mm bh 25,000.00

180 cm x 105 cm x 4 mm bh 30,000.00

210 cm x 105 cm x 4 mm bh 35,000.00

240 cm x 105 cm x 4 mm bh 40,000.00

270 cm x 105 cm x 4 mm bh 58,500.00

300 cm x 105 cm x 4 mm bh 49,000.00

14 Asbes Plat100 cm x 100 cm x 3 mm bh 10,000.00

100 cm x 100 cm x 4 mm bh 14,250.00

50 cm x 200 cm x 3 mm bh 10,000.00

40 cm x 200 cm x 3 mm bh 8,000.00

15 Jabes Nok

kerpus genteng bh 17,000.00

stel besar bh 39,750.00

paten besar bh 35,800.00

16 Nokstel gelombang harflex

stel besar bh 41,500.00

paten besar bh 17,300.00

plat besar bh 49,000.00

17 Fibre glass (Jabes)

180 x 92 cm bh 27,000.00

200 x 92 cm bh 31,000.00

250 x 92 cm bh 38,000.00

180 x 105 cm bh 30,000.00

200 x 105cm bh 35,000.00

250 x 105 cm bh 43,750.00

18 Seng Plat

BJLS 0,18 lebar 55 cm m' 11,000.00

BJLS 0,20 lebar 55 cm m' 12,500.00

BJLS 0,28 lebar 55 cm m' 14,000.00

BJLS 0,30 lebar 55 cm m' 16,500.00

19 Seng GelombangBJLS 0,18 lebar 180 cm lbr 22,000.00

BJLS 0,20 lebar 180 cm lbr 27,000.00

BJLS 0,30 lebar 180 cm lbr 39,000.00

BJLS 0,40 lebar 180 cm lbr 51,000.00

20 Kayu Jati papan m3 12,000,000.00

Kayu jati balok / pesagen m3 9,500,000.00

21 Kayu kamper papan

Kayu kamper balok / pesagen

Page 35: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 35/45

22 Kayu kruing papan

Kayu kruing balok / pesagen

23 Kayu meranti papan

Kayu meranti balok / pesagen

24 Kayu Lanan papan

Kayu Lanan Balok / Pesagen

Page 36: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 36/45

30000

33000

Page 37: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 37/45

DAFTAR HARGA BAHAN

Harga Satuan

Rp1 Kayu Dolken diameter 8 - 10 / 400 cm btg 12,000.00

2 Portland Cement kg 675.00

3 Seng Gelombang 3" - 5 " Lbr 39,000.004 Pasir Beton m3 120,000.00

5 Koral Beton m3 120,000.00

6 Kayu 5/7 x 4 m kayu kruing m3 58,800.00

7 Paku Biasa 2" - 5" (1/2" - 1") kg 7,500.00

8 Meni besi kg 12,500.00

9 Kayu papan 3/20 Kruing m3 4,200,000.00

10 Kayu kamper m3 750,000.00

11 Besi strip kg 9,200.00

12 Pasir pasang m3 90,000.00

13 Batu bata merah bh 200.00

14 Seng plat lbr 11,000.00

15 jendela Naco bh 5,500.0016 Kaca Polos m2 40,000.00

17 Kunci tanam khusus bh 35,000.00

18 Engsel bh 2,500.00

19 Plywood 4 mm lbr 64,000.00

20 Bambu Diameter 6 - 8 / 600 cm btg 7,000.00

21 Tali ijuk kg 5,000.00

22 Pasir urug m3 60,000.00

23 Kapur padam m3 115,000.00

24 Tanah liat m3 40,000.00

25 Ijuk m3 125,000.00

26 Sirtu m3 80,000.00

27 Batu belah 15/20 m3 115,000.00

28 Kapur pasang m3 115,000.00

29 Besi beton kg 6,000.00

30 Kawat Beton kg 7,500.00

31 kayu kaso 5/7 m3 24,500.00

32 minyak bekesting ltr 18,000.00

33 Plamur Tembok kg 8,500.00

34 kayu jati balok m3 9,500,000.00

35 kayu kamper papan m3 4,750,000.00

36 kayu jati papan m3 12,000,000.00

37 lem kayu ltr 18,000.00

38 Plywood 4" x 3" x 4mm lbr 64,000.00

39 teakwood 4" x 8 " x 4 mm lbr 64,000.00

40 Formika 4" x 3" (untuk pintu) lbr 42,000.0041 kayu kamfer balok m3 4,500,000.00

42 Paku sekrup 3,5" kg 14,000.00

43 Besi presstred polos kg 14,000.00

44 besi jaring kawat baja kg 13,000.00

45 kayu terentang m3 500,000.00

46 balok kayu m3 4,200,000.00

47 plywood tebal 9 mm lbr 136,000.00

48 Balok kayu borneo m3 750,000.00

No Bahan Satuan

Page 38: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 38/45

49 Formite/penjaga jarak/spacer (alat bantu) bh 5,000.00

50 Kayu albasia m3 500,000.00

51 Genteng plentong bh 800.00

52 Genteng kodok / glasur bh 1,800.00

53 Genteng plentong super / besar bh 2,600.00

54 Genteng bubung plentong bh 1,550.00

55 Genteng bubung kodok / glasur bh 2,500.0056 Genteng bubung plentong besar bh 4,000.00

57 Paku pancing 60 x 230 kg 11,000.00

58 Asbes Gelombang lbr 56,250.00

59 Genteng beton standard bh 2,000.00

60 Genteng sirap lbr 1,350.00

61 Nok genteng beton bh 2,500.00

62 Semen warna kg 3,500.00

63 seng plat 3" x 6" BJLS 28 lbr 14,000.00

64 kayu kamfer papan tebal 6 cm m3 114,000.00

65 Allumunium foil / Sisalation m2 4,500.00

66 Plat asbes tebal 6 mm lbr 90,000.00

67 Akustik Uk. 30 x 30 cm lbr 3,000.0068 Plywood 4" x 8" x 4 mm dan 6 mm lbr 64,000.00

69 Softboard 4" x 8" x 4 mm m3 90,000.00

70 list kayu profil m 3,700.00

71 Asbes 1 x 1 m untuk plafond lbr 10,000.00

72 gypsumboard lbr 45,000.00

73 Klosed duduk / mono blok bh 270,000.00

74 Klosed Jongkok bh 80,000.00

75 Urinoir bh 275,000.00

76 wastafel meja oval bh 400,000.00

77 Porselen 11 x 11 cm bh 191.92

78 Semen nat kg 3,500.00

79 Pipa beton D15 - 20 cm bh 16,000.00

80 Pipa beton D30 - 100 cm bh 26,000.00

81 pipa galvanis D3/4" m' 26,000.00

82 pipa galvanis D3" m' 35,500.00

83 pipa galvanis D4" m' 54,166.67

84 pipa PVC D1/2" m' 3,875.00

85 pipa PVC D2" m' 9,166.67

86 pipa PVC D3" m' 20,000.00

87 Bak cuci stainles steel bh 130,000.00

88 Water drain dan Assesoris set 130,000.00

89 kran air 1/2" dan 3/4" bh 6,000.00

90 Seal tape set 600.00

91 Floor drain bh 5,000.00

92 Besi Profil WF kg 5,500.0093 Pintu besi baja m2 250,000.00

94 Pintu lipat besi m2 250,000.00

95 Roll Door m2 145,000.00

96 pintu alumunium m2 190,000.00

97 besi strip 2 x 3 m' 10,883.33

98 Kawat harmonika m2 19,000.00

99 Kawat nyamuk nylon m2 9,000.00

100 Flincote / meni besi kg 12,500.00

Page 39: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 39/45

101 kunci tanam biasa bh 30,000.00

102 Kunci Selinder bh 35,000.00

103 Engsel Pintu bh 6,000.00

104 Engsel jendela bh 2,500.00

105 Engsel Angin bh 15,000.00

106 kait Angin bh 2,000.00

107 Door Closer bh 7,500.00108 kunci Selot bh 3,500.00

109 Door Stop bh 7,500.00

110 Rel pintu Dorong bh 15,000.00

111 Kunci Lemari bh 3,500.00

112 Kaca tebal 3 mm m2 40,000.00

113 Kaca tebal 5 mm m2 50,000.00

114 Kaca cermin m2 75,000.00

115 Ubin abu-abu 20 x 20 cm bh 720.00

116 Ubin granito 40 x 40 cm bh 185,000.00

117 Plint ubin PC Warna 10 x 20 cm bh 5,000.00

118 Ubin keramik 20 x 20 bh 1,280.00

119 Ubin keramik 30 x 30 bh 3,333.33120 Parket jati m2 120,000.00

121 Lem Vynil kg 18,000.00

122 keramik dinding 10 x 20 bh 600.00

123 keramik dinding 20 x 20 bh 920.00

124 Batu paros m2 65,000.00

125 Soda Api kg 12,000.00

126 sabun kg 9,000.00

127 Dempul jadi kg 10,000.00

128 Minyak cat kg 6,000.00

129 Amplas lbr 2,000.00

130 cat dasar besi kg 12,500.00

131 Cat dasar kayu kg 12,500.00

132 cat dasar tembok kg 6,000.00

133 Cat penutup tembok kg 48,500.00

134 Cat penutup kayu kg 25,000.00

135 cat penutup besi kg 28,500.00

136 Cat meni kayu kg 12,500.00

137 plamir kayu kg 10,000.00

138 Teak Oil ltr 19,000.00

139 politur ltr 19,000.00

140 Residu atau ter ltr 2,375.00

141 vernis ltr 19,000.00

142 Kuas bh 1,500.00

143 Perekat / lem kg 17,500.00

144 Perancah kayu m3 500,000.00145 Paving m2 30,000.00

146 Kansteen beton m' 22,500.00

147 Got U-20 m3 16,000.00

148 Got U-30 m3 26,000.00

149 Pipa + Asesoris set 180,000.00

150 Handle bak kontrol bh 2,000.00

Page 40: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 40/45

Page 41: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 41/45

HARGA SATUAN(Rp)

1

23

4

5

6

7

8

9

10

11

12

13

1415

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

3940

41

42

43

44

45

46

47

NO. URAIAN PEKERJAAN SATUAN

Page 42: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 42/45

48

49

50

51

52

53

5455

56

57

58

59

60

61

62

63

64

65

6667

68

69

70

Page 43: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 43/45

HARGA JUMLAH TOTAL

NO. VOL SAT SATUAN HARGA( Rp ) ( Rp ) ( Rp )

I. PEKERJAAN PERSIAPAN1 Pembersihan Lapangan 126.00 m2 2,000.00 252,000.00

2 Pengukuran dan Bowplank 49.00 m' 8,500.00 416,500.00

3 Papan Nama Proyek 0.96 m2 400,000.00 384,000.004 Barak Kerja 12.00 m2 100,000.00 1,200,000.00

Sub Total I  2,252,500.0

II. PEKERJAAN TANAH DAN PONDASI

1 Galian Tanah Pondasi 62.00 m3 11,400.00 706,800.00

2 Urugan Tanah Dipadatkan 34.10 m3 19,715.00 672,281.503 Perataan dan Pemadatan Tanah 118.00 m2 8,000.00 944,000.00

4 Urugan Pasir bawah Pondasi 2.48 m3 0.00 0.00

5 Aanstamping 7.44 m3 0.00 0.00

6 Pondasi Batu Belah 21.70 m3 0.00 0.00

7 Urugan Tanah Kembali Pondasi 27.90 m3 5,465.00 152,473.50

Sub Total II  2,475,555.0III. PEK. BETON BERTULANG1 Sloof 15/20 1.69 m3 0.00 0.00

2 Kolom Praktis 15/15 1.58 m3 0.00 0.00

3 Kolom Teras 0.63 m3 0.00 0.00

4 Ring Balk & Ring Gunungan 15/20 2.59 m3 0.00 0.00

5 Kuda-kuda Beton & Balok Latiu 15/20 2.54 m3 0.00 0.006 Topi-topi Cor Beton Tebal 10 cm 0.45 m3 0.00 0.00

Sub Total III  0.0

IV. PEK. PASANG BATA/ PLESTERAN

1 Pasangan Trasram Batu Bata 1 : 4 17.00 m2 0.00 0.00

2 Pasangan Batu Bata 1 : 6 143.00 m2 0.00 0.00

3 Rollag Bata 9.00 m' 0.00 0.00

4 Plesteran Trasram 1 : 4 34.00 m2 0.00 0.005 Plesteran 1 : 6 293.15 m2 0.00 0.00

6 Sponengan 146.00 m' 0.00 0.00Sub Total IV  0.0

V. PEK. KOSEN, DAUN PINTU & JENDELA

1 Pas. Kosen K. Bengkirai 6/15 0.27 m3 0.00 0.002 Pas. Daun Pintu Panil K. Kamper 7.48 m2 0.00 0.00

3 Pas. Daun Jendela Kaca 5 mm Rgk. K. Ka 1.75 m2 0.00 0.00

4 Pas. Pintu PVC KM 1.00 bh 250,000.00 250,000.00

5 Pas. Handel & Kunci Pintu Utama 1.00 unit 350,000.00 350,000.00

6 Pas. Kunci Tanam Pintu Ruang 3.00 bh 90,000.00 270,000.00

7 Pas. Grendel Tanam/Espangolet P. Utama 1.00 bh 75,000.00 75,000.008 Pas. Engsel Pintu 15.00 bh 15,000.00 225,000.00

9 Pas. Engsel Jendela 4.00 bh 10,000.00 40,000.00

10 Pas. Grendel Jendela 2.00 bh 10,000.00 20,000.00

11 Pas. Kait Angin Jendela 4.00 bh 12,500.00 50,000.00

Sub Total V  1,280,000.0VI. PEKERJAAN ATAP

1 Nok, Gording dan Murplat 8/12 0.71 m3 0.00 0.002 Pas. Usuk 5/7 dan Reng 2/3 Kruing 161.00 m2 0.00 0.00

3 Pas. Papan Reuter 2/20 Kruing 16.00 m' 0.00 0.00

4 Pas. Listplank 2/20 Bengkirai 60.00 m' 0.00 0.00

5 Pas. Genteng Beton 161.00 m2 0.00 0.00

6 Pas. Bubungan Genteng Beton 16.00 m' 0.00 0.00Sub Total VI  0.0

VII. PEK. PAS. KERAMIK LANTAI & DINDING

1 Urugan Pasir Bawah Lantai 4.10 m3 0.00 0.00

URAIAN PEKERJAAN

Page 44: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 44/45

2 Pas. Keramik Ruang Dalam 30/30 Putih 75.00 m2 0.00 0.00

3 Pas. Keramik 30/30 Motif Teras Dpn 6.00 m2 0.00 0.00

4 Pas. Plint Kaca Rayband 8/60 R. Dalam 57.00 m' 15,000.00 855,000.00

5 Pas. Keramik Lantai KM 20/20 2.00 m2 0.00 0.00

6 Pas. Keramik Dinding KM 20/25 11.00 m2 0.00 0.00

7 Pas. List Border Keramik 5/20 Dinding KM 5.70 m' 45,500.00 259,350.00Sub Total VII  1,114,350.0

VIII. PEK. PLAFOND & INSTALASI LISTRIK1 Pas. Plafond Eternit 100x100 Rgk K. Mrant 130.00 m2 0.00 0.00

2 Pas. List Plafond Kayu Profil 3 cm 140.00 m' 6,750.00 945,000.00

3 Pas. Sambungan Listrik Baru 900 KVA 1.00 Samb 1,750,000.00 1,750,000.00

4 Instalasi Titik Lampu 10.00 titik 70,000.00 700,000.005 Instalasi Titik Stop Kontak 2.00 titik 70,000.00 140,000.00

6 Pas. Fuse Box dan MCB Group 1.00 bh 150,000.00 150,000.00

7 Pas. Saklar Tunggal 3.00 bh 15,000.00 45,000.00

8 Pas. Saklar Double 2.00 bh 17,500.00 35,000.00

9 Pas. Stop Kontak 2.00 bh 15,000.00 30,000.00

10 Pas. Lampu TL 20 W+ Armateur 5.00 bh 90,000.00 450,000.0011 Pas. Lampu SL 15 W 5.00 bh 30,000.00 150,000.00

Sub Total VIII  4,395,000.0

IX. PEKERJAAN SANITAIR

1 Pas. Closet Jongkok 1.00 bh 150,000.00 150,000.00

2 Pas. Kran Air 3/4" 1.00 bh 25,000.00 25,000.00

3 Floor Drain 1.00 bh 15,000.00 15,000.004 Tempat Sabun / Shampo 1.00 bh 45,000.00 45,000.00

5 Pas. Bak Mandi 60 x 60 Fiber 1.00 bh 300,000.00 300,000.00

Sub Total IX  535,000.0

X. PEKERJAAN SALURAN AIR

1 Sal. Air Kotor Pipa PVC 3" 8.00 m' 25,000.00 200,000.002 Sal. Air Kotor WC PVC 4" 8.00 m' 35,000.00 280,000.00

3 Sal. Air Bersih Pipa PVC 3/4" 18.00 m' 7,500.00 135,000.00

4 Septictank & Peresapan 1.00 unit 2,000,000.00 2,000,000.00

Sub Total X  2,615,000.0

XI. PEKERJAAN CAT

1 Cat Tembok Exterior 72.00 m2 0.00 0.00

2 Cat Tembok Interior 197.15 m2 0.00 0.00

3 Cat Plafond 130.00 m2 0.00 0.004 Cat Kusen, Daun Pintu/Jendela 13.76 m2 0.00 0.00

5 Cat Kayu Listplank 15.00 m2 0.00 0.00

Sub Total XI  0.0

XII. PEKERJAAN LAIN-LAIN1 Pas. Glass Block 20/20 36.00 bh 17,500.00 630,000.00

2 Kamprat Dinding 27.80 m2 12,500.00 347,500.00

3 Pos Penjagaan 1.00 Unit 11,152,000.00 11,152,000.00

4 Meubeler ( 1 meja dan 2 kursi ) 20.00 Unit 400,000.00 8,000,000.00Sub Total XII  20,129,500.0

Jumlah Total 34,796,905.0

Page 45: 90736216-RAB-ANALISA-SNI-2007

5/17/2018 90736216-RAB-ANALISA-SNI-2007 - slidepdf.com

http://slidepdf.com/reader/full/90736216-rab-analisa-sni-2007 45/45

I. PEKERJAAN PERSIAPAN Rp. 2,252,500.00

II. PEKERJAAN TANAH DAN PONDASI Rp. 2,475,555.00

III. PEK. BETON BERTULANG Rp. 0.00

IV. PEK. PASANG BATA/ PLESTERAN Rp. 0.00

V. PEK. KOSEN, DAUN PINTU & JENDELA Rp. 1,280,000.00

VI. PEKERJAAN ATAP Rp. 0.00

VII. PEK. PAS. KERAMIK LANTAI & DINDING Rp. 1,114,350.00

VIII. PEK. PLAFOND & INSTALASI LISTRIK Rp. 4,395,000.00

IX. PEKERJAAN SANITAIR Rp. 535,000.00

X. PEKERJAAN SALURAN AIR Rp. 2,615,000.00

XI. PEKERJAAN CAT Rp. 0.00

XII. PEKERJAAN LAIN-LAIN Rp. 20,129,500.00

Jumlah Harga (termasuk Biaya Umum + Keuntungan) Rp. 34,796,905.00

PPN 10 % Rp. 3,479,690.50

Jumlah Semua Harga Kontrak Rp. 38,276,595.50

Dibulatkan Rp. 38,276,000.00

: # Seratus Lima Puluh Satu Juta Rupiah # Terbilang