1 4 5 6 7 16 BEKISTING KOLOM BETON 1 M2 Bahan : Kayu/ Papan Kls. III 0.040 M3 2,000,000.00 Rp 80,000.00 Rp Paku 0.400 Kg 15,000.00 Rp 6,000.00 Rp Minyak Bekisting 0.200 Ltr 2,000.00 Rp 400.00 Rp Kayu Kls. II ( Papan ) 0.015 M3 2,500,000.00 Rp 37,500.00 Rp Dolken Kayu Galam/ Bambu 2.000 Btg 7,500.00 Rp 15,000.00 Rp Polywood 9 mm 0.350 Lbr 90,000.00 Rp 31,500.00 Rp Upah : Pekerja 0.660 Org 45,000.00 Rp 29,700.00 Rp Tukang Kayu 0.330 Org 50,000.00 Rp 16,500.00 Rp Kepala Tukang 0.033 Org 55,000.00 Rp 1,815.00 Rp Mandor 0.033 Org 55,000.00 Rp 1,815.00 Rp Jumlah 170,400.00 Rp 49,830.00 Rp Harga Satuan 0.50 110,115.00 Rp 17 COR KOLOM K1 (40/40) BETON K-250/ M3 ( A ) Beton K-250 1.000 M3 1,355,425.00 Rp 1,355,425.00 Rp ( B ) Pembesian 100 Kg 3.000 100Kg 1,254,000.00 Rp 3,762,000.00 Rp ( C ) Bekisting/ Cetakan/ M3 10.000 M2 110,115.00 Rp 1,101,150.00 Rp Jumlah 4,863,150.00 Rp Harga Satuan 1 4,863,150.00 Rp 18 COR KOLOM K2 (40/40) BETON K-250/ M3 ( A ) Beton K-250 1.000 M3 1,355,425.00 Rp 1,355,425.00 Rp ( B ) Pembesian 100 Kg 3.000 100Kg 1,254,000.00 Rp 3,762,000.00 Rp ( C ) Bekisting/ Cetakan/ M3 10.000 M2 110,115.00 Rp 1,101,150.00 Rp Jumlah 4,863,150.00 Rp Harga Satuan 1 4,863,150.00 Rp 19 COR KOLOM PRAKTIS 12 x 12 BETON K-225/ M3 ( A ) Beton K-225 1.000 M3 693,125.53 Rp 693,125.53 Rp ( B ) Pembesian 100 Kg 2.570 100Kg 1,254,000.00 Rp 3,222,780.00 Rp ( C ) Bekisting/ Cetakan/ M3 16.667 M2 110,115.00 Rp 1,835,286.71 Rp Jumlah 5,058,066.71 Rp Harga Satuan 1 5,058,066.71 Rp 20 COR BALOK PRAKTIS 12 x 15 BETON K-225/ M3 ( A ) Beton K-225 1.000 M3 693,125.53 Rp 693,125.53 Rp ( B ) Pembesian 100 Kg 2.264 100Kg 1,254,000.00 Rp 2,839,056.00 Rp ( C ) Bekisting/ Cetakan/ M3 16.667 M2 51,980.00 Rp 866,350.66 Rp Jumlah 3,705,406.66 Rp Harga Satuan 1 3,705,406.66 Rp 21 COR BALOK LISTPLANK (15 x 40) BETON K-250/ M3 ( A ) Beton K-250 1.000 M3 1,355,425.00 Rp 1,355,425.00 Rp ( B ) Pembesian 100 Kg 1.445 100Kg 1,254,000.00 Rp 1,812,030.00 Rp ( C ) Bekisting/ Cetakan/ M3 13.333 M2 51,980.00 Rp 693,049.34 Rp Jumlah 2,505,079.34 Rp Harga Satuan 1 2,505,079.34 Rp 22 PASANG KACA 5 mm/ M2 Bahan : Kaca Polos 1.100 M2 110,000.00 Rp 121,000.00 Rp Upah : Pekerja 0.015 Org 45,000.00 Rp 675.00 Rp Tukang Kayu 0.150 Org 50,000.00 Rp 7,500.00 Rp Kepala Tukang 0.015 Org 55,000.00 Rp 825.00 Rp Mandor 0.001 Org 55,000.00 Rp 55.00 Rp Jumlah 121,000.00 Rp 9,055.00 Rp Harga Satuan 1 130,055.00 Rp 23 PASANG KUSEN ALUMUNIUM/ M Bahan : Kusen Alumunium 1.050 M1 45,000.00 Rp 47,250.00 Rp Perlengkapan ( 15% x Kusen ) 0.100 6,750.00 Rp 675.00 Rp Upah : Pekerja 0.015 Org 45,000.00 Rp 675.00 Rp Tukang Kayu 0.150 Org 50,000.00 Rp 7,500.00 Rp Kepala Tukang 0.015 Org 55,000.00 Rp 825.00 Rp Mandor 0.0075 Org 55,000.00 Rp 412.50 Rp Jumlah 47,925.00 Rp 9,412.50 Rp Harga Satuan 1 57,337.50 Rp 24 VERTICAL BLINDS/ M2 Bahan : Ventilation Blinds dan Vertical Blinds 1.000 M2 180,000.00 Rp 180,000.00 Rp Upah : Pekerja 0.350 Org 45,000.00 Rp 15,750.00 Rp Tukang Kayu 0.350 Org 50,000.00 Rp 17,500.00 Rp Kepala Tukang 0.035 Org 55,000.00 Rp 1,925.00 Rp Mandor 0.0180 Org 55,000.00 Rp 990.00 Rp Jumlah 180,000.00 Rp 36,165.00 Rp Harga Satuan 1 216,165.00 Rp JUMLAH HARGA (Rp) BAHAN (Rp) UPAH (Rp) 2 3 NO URAIAN PEKERJAAN KOFESIEN HARGA SATUAN (Rp) J U M L A H

Upload: willy-priambudi

Post on 20-Jan-2016

182 views

Category:

Documents


7 download

TRANSCRIPT

Page 1: 88863398 Analisa Pemasangan Acp

1 4 5 6 716 BEKISTING KOLOM BETON 1 M2

Bahan :Kayu/ Papan Kls. III 0.040 M3 2,000,000.00Rp 80,000.00RpPaku 0.400 Kg 15,000.00Rp 6,000.00RpMinyak Bekisting 0.200 Ltr 2,000.00Rp 400.00RpKayu Kls. II ( Papan ) 0.015 M3 2,500,000.00Rp 37,500.00RpDolken Kayu Galam/ Bambu 2.000 Btg 7,500.00Rp 15,000.00RpPolywood 9 mm 0.350 Lbr 90,000.00Rp 31,500.00RpUpah :Pekerja 0.660 Org 45,000.00Rp 29,700.00RpTukang Kayu 0.330 Org 50,000.00Rp 16,500.00RpKepala Tukang 0.033 Org 55,000.00Rp 1,815.00RpMandor 0.033 Org 55,000.00Rp 1,815.00RpJumlah 170,400.00Rp 49,830.00Rp

Harga Satuan 0.50 110,115.00Rp17 COR KOLOM K1 (40/40) BETON K-250/ M3( A ) Beton K-250 1.000 M3 1,355,425.00Rp 1,355,425.00Rp( B ) Pembesian 100 Kg 3.000 100Kg 1,254,000.00Rp 3,762,000.00Rp( C ) Bekisting/ Cetakan/ M3 10.000 M2 110,115.00Rp 1,101,150.00RpJumlah 4,863,150.00Rp

Harga Satuan 1 4,863,150.00Rp18 COR KOLOM K2 (40/40) BETON K-250/ M3( A ) Beton K-250 1.000 M3 1,355,425.00Rp 1,355,425.00Rp( B ) Pembesian 100 Kg 3.000 100Kg 1,254,000.00Rp 3,762,000.00Rp( C ) Bekisting/ Cetakan/ M3 10.000 M2 110,115.00Rp 1,101,150.00RpJumlah 4,863,150.00Rp

Harga Satuan 1 4,863,150.00Rp19 COR KOLOM PRAKTIS 12 x 12 BETON K-225/ M3( A ) Beton K-225 1.000 M3 693,125.53Rp 693,125.53Rp( B ) Pembesian 100 Kg 2.570 100Kg 1,254,000.00Rp 3,222,780.00Rp( C ) Bekisting/ Cetakan/ M3 16.667 M2 110,115.00Rp 1,835,286.71RpJumlah 5,058,066.71Rp

Harga Satuan 1 5,058,066.71Rp20 COR BALOK PRAKTIS 12 x 15 BETON K-225/ M3( A ) Beton K-225 1.000 M3 693,125.53Rp 693,125.53Rp( B ) Pembesian 100 Kg 2.264 100Kg 1,254,000.00Rp 2,839,056.00Rp( C ) Bekisting/ Cetakan/ M3 16.667 M2 51,980.00Rp 866,350.66RpJumlah 3,705,406.66Rp

Harga Satuan 1 3,705,406.66Rp21 COR BALOK LISTPLANK (15 x 40) BETON K-250/ M3( A ) Beton K-250 1.000 M3 1,355,425.00Rp 1,355,425.00Rp( B ) Pembesian 100 Kg 1.445 100Kg 1,254,000.00Rp 1,812,030.00Rp( C ) Bekisting/ Cetakan/ M3 13.333 M2 51,980.00Rp 693,049.34RpJumlah 2,505,079.34Rp

Harga Satuan 1 2,505,079.34Rp22 PASANG KACA 5 mm/ M2

Bahan :Kaca Polos 1.100 M2 110,000.00Rp 121,000.00RpUpah :Pekerja 0.015 Org 45,000.00Rp 675.00RpTukang Kayu 0.150 Org 50,000.00Rp 7,500.00RpKepala Tukang 0.015 Org 55,000.00Rp 825.00RpMandor 0.001 Org 55,000.00Rp 55.00RpJumlah 121,000.00Rp 9,055.00Rp

Harga Satuan 1 130,055.00Rp23 PASANG KUSEN ALUMUNIUM/ M

Bahan :Kusen Alumunium 1.050 M1 45,000.00Rp 47,250.00RpPerlengkapan ( 15% x Kusen ) 0.100 6,750.00Rp 675.00RpUpah :Pekerja 0.015 Org 45,000.00Rp 675.00RpTukang Kayu 0.150 Org 50,000.00Rp 7,500.00RpKepala Tukang 0.015 Org 55,000.00Rp 825.00RpMandor 0.0075 Org 55,000.00Rp 412.50RpJumlah 47,925.00Rp 9,412.50Rp

Harga Satuan 1 57,337.50Rp24 VERTICAL BLINDS/ M2

Bahan :Ventilation Blinds dan Vertical Blinds 1.000 M2 180,000.00Rp 180,000.00RpUpah :Pekerja 0.350 Org 45,000.00Rp 15,750.00RpTukang Kayu 0.350 Org 50,000.00Rp 17,500.00RpKepala Tukang 0.035 Org 55,000.00Rp 1,925.00RpMandor 0.0180 Org 55,000.00Rp 990.00RpJumlah 180,000.00Rp 36,165.00Rp

Harga Satuan 1 216,165.00Rp

JUMLAHHARGA

(Rp)BAHAN

(Rp)UPAH(Rp)2 3NO URAIAN PEKERJAAN KOFESIEN

HARGASATUAN

(Rp)

J U M L A H

Page 2: 88863398 Analisa Pemasangan Acp

1 4 5 6 725 PASANG RANGKA JENDELA/ PINTU ALUMUNIUM/ M

Bahan :Kusen Alumunium 1.050 M1 45,000.00Rp 47,250.00RpPerlengkapan ( 15% x Kusen ) 0.150 6,750.00Rp 1,012.50RpUpah :Pekerja 0.015 Org 45,000.00Rp 675.00RpTukang Kayu 0.150 Org 50,000.00Rp 7,500.00RpKepala Tukang 0.015 Org 55,000.00Rp 825.00RpMandor 0.0008 Org 55,000.00Rp 44.00RpJumlah 48,262.50Rp 9,044.00Rp

Harga Satuan 1 57,306.50Rp26 JENDELA J1 / UNIT

Bahan :Frame Alumunium 27.900 M' 57,337.50Rp 1,599,716.25RpFrame Daun Jendela 18.960 M' 57,306.50Rp 1,086,531.24RpKaca Polos 5 mm 10.200 M2 130,055.00Rp 1,326,561.00RpKaret Kaca/ Sealent 39.200 M' 2,500.00Rp 98,000.00RpPintu Teak Wood 6 mm L/D (Jati) 0.000 Bh -RpKunci Pintu 2 x Slagh 0.000 Bh 180,000.00Rp -RpGrendel Pintu 0.000 Bh 10,000.00Rp -RpEngsel Pintu 0.000 Bh 15,000.00Rp -RpTarikan Jendela/ Ventilasi Alumunium 4.000 Bh 10,000.00Rp 40,000.00RpGrendel Jendela Alumunium 8.000 Bh 10,000.00Rp 80,000.00RpEngsel Jendela Alumunium 8.000 Bh 10,000.00Rp 80,000.00RpHak Angin Alumunium 8.000 Bh 10,000.00Rp 80,000.00RpVertical Blinds 0.000 M2 216,165.00Rp -RpUpah :Pemasangan 0.000 Bhn -Rp -RpJumlah 4,390,808.49Rp -Rp

Harga Satuan 1 4,390,808.49Rp27 JENDELA J2 / UNIT

Bahan :Frame Alumunium 39.200 M' 57,337.50Rp 2,247,630.00RpFrame Daun Jendela 18.960 M' 57,306.50Rp 1,086,531.24RpKaca Polos 5 mm 16.320 M2 130,055.00Rp 2,122,497.60RpKaret Kaca/ Sealent 60.000 M' 2,500.00Rp 150,000.00RpPintu Teak Wood 6 mm L/D (Jati) 0.000 Bh -Rp -RpKunci Pintu 2 x Slagh 0.000 Bh 180,000.00Rp -RpGrendel Pintu 0.000 Bh 10,000.00Rp -RpEngsel Pintu 0.000 Bh 15,000.00Rp -RpTarikan Jendela/ Ventilasi Alumunium 4.000 Bh 10,000.00Rp 40,000.00RpGrendel Jendela Alumunium 8.000 Bh 10,000.00Rp 80,000.00RpEngsel Jendela Alumunium 8.000 Bh 10,000.00Rp 80,000.00RpHak Angin Alumunium 8.000 Bh 10,000.00Rp 80,000.00RpVertical Blinds 0.000 M2 216,165.00Rp -RpUpah :Pemasangan 0.000 Bhn -Rp -RpJumlah 5,886,658.84Rp -Rp

Harga Satuan 1 5,886,658.84Rp28 JENDELA J3 / UNIT

Bahan :Frame Alumunium 23.550 M' 57,337.50Rp 1,350,298.13RpFrame Daun Jendela 19.770 M' 57,306.50Rp 1,132,949.51RpKaca Polos 5 mm 9.180 M2 130,055.00Rp 1,193,904.90RpKaret Kaca/ Sealent 34.800 M' 2,500.00Rp 87,000.00RpPintu Teak Wood 6 mm L/D (Jati) 0.000 Bh -Rp -RpKunci Pintu 2 x Slagh 0.000 Bh 180,000.00Rp -RpGrendel Pintu 0.000 Bh 10,000.00Rp -RpEngsel Pintu 0.000 Bh 15,000.00Rp -RpTarikan Jendela/ Ventilasi Alumunium 4.000 Bh 10,000.00Rp 40,000.00RpGrendel Jendela Alumunium 8.000 Bh 10,000.00Rp 80,000.00RpEngsel Jendela Alumunium 8.000 Bh 10,000.00Rp 80,000.00RpHak Angin Alumunium 8.000 Bh 10,000.00Rp 80,000.00RpVertical Blinds 0.000 M2 216,165.00Rp -RpUpah :Pemasangan 0.000 Bhn -Rp -RpJumlah 4,044,152.53Rp -Rp

Harga Satuan 1 4,044,152.53Rp

JUMLAHHARGA

(Rp)BAHAN

(Rp)UPAH(Rp)2 3NO URAIAN PEKERJAAN KOFESIEN

HARGASATUAN

(Rp)

J U M L A H

Page 3: 88863398 Analisa Pemasangan Acp

1 4 5 6 729 JENDELA J4 / UNIT

Bahan :Frame Alumunium 15.000 M' 57,337.50Rp 860,062.50RpFrame Daun Jendela 0.000 M' 57,306.50Rp -RpKaca Polos 5 mm 5.440 M2 130,055.00Rp 707,499.20RpKaret Kaca/ Sealent 20.000 M' 2,500.00Rp 50,000.00RpPintu Teak Wood 6 mm L/D (Jati) 0.000 Bh -Rp -RpKunci Pintu 2 x Slagh 0.000 Bh 180,000.00Rp -RpGrendel Pintu 0.000 Bh 10,000.00Rp -RpEngsel Pintu 0.000 Bh 15,000.00Rp -RpTarikan Jendela/ Ventilasi Alumunium 0.000 Bh 10,000.00Rp -RpGrendel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpEngsel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpHak Angin Alumunium 0.000 Bh 10,000.00Rp -RpUpah :Pemasangan 0.000 Bhn -Rp -RpJumlah 1,617,561.70Rp -Rp

Harga Satuan 1 1,617,561.70Rp30 JENDELA J7 / UNIT

Bahan :Frame Alumunium 14.520 M' 57,337.50Rp 832,540.50RpFrame Daun Jendela 0.000 M' 57,306.50Rp -RpKaca Polos 5 mm 3.128 M2 130,055.00Rp 406,812.04RpKaret Kaca/ Sealent 14.520 M' 2,500.00Rp 36,300.00RpPintu Teak Wood 6 mm L/D (Jati) 0.000 Bh -Rp -RpKunci Pintu 2 x Slagh 0.000 Bh 180,000.00Rp -RpGrendel Pintu 0.000 Bh 10,000.00Rp -RpEngsel Pintu 0.000 Bh 15,000.00Rp -RpTarikan Jendela/ Ventilasi Alumunium 0.000 Bh 10,000.00Rp -RpGrendel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpEngsel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpHak Angin Alumunium 0.000 Bh 10,000.00Rp -RpUpah :Pemasangan 0.000 Bhn -Rp -RpJumlah 1,275,652.54Rp -Rp

Harga Satuan 1 1,275,652.54Rp31 PINTU P1 / UNIT

Bahan :Frame Alumunium 11.900 M' 57,337.50Rp 682,316.25RpFrame Daun Jendela 20.240 M' 57,306.50Rp 1,159,883.56RpKaca Polos 5 mm 5.680 M2 130,055.00Rp 738,712.40RpKaret Kaca/ Sealent 13.500 M' 2,500.00Rp 33,750.00RpPintu Teak Wood 6 mm L/D (Jati) 0.000 Bh -Rp -RpKunci Pintu 2 x Slagh 1.000 Bh 180,000.00Rp 180,000.00RpGrendel Pintu 4.000 Bh 10,000.00Rp 40,000.00RpEngsel Pintu 6.000 Bh 15,000.00Rp 90,000.00RpTarikan Jendela/ Ventilasi Alumunium 0.000 Bh 10,000.00Rp -RpGrendel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpEngsel Jendela Alumunium 4.000 Bh 10,000.00Rp 40,000.00RpHak Angin Alumunium 4.000 Bh 10,000.00Rp 40,000.00RpUpah :Pemasangan 0.000 Bhn -Rp -RpJumlah 3,004,662.21Rp -Rp

Harga Satuan 1 3,004,662.21Rp32 PINTU P2 / UNIT

Bahan :Frame Alumunium 39.700 M' 57,337.50Rp 2,276,298.75RpFrame Daun Jendela 5.800 M' 57,306.50Rp 332,377.70RpKaca Polos 5 mm 8.648 M2 130,055.00Rp 1,124,715.64RpKaret Kaca/ Sealent 45.550 M' 2,500.00Rp 113,875.00RpGipsum Board 9 mm 7.682 Lbr 60,000.00Rp 460,920.00RpKunci Pintu 2 x Slagh 1.000 Bh 180,000.00Rp 180,000.00RpGrendel Pintu 2.000 Bh 10,000.00Rp 20,000.00RpEngsel Pintu 3.000 Bh 15,000.00Rp 45,000.00RpTarikan Jendela/ Ventilasi Alumunium 0.000 Bh 10,000.00Rp -RpGrendel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpEngsel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpHak Angin Alumunium 0.000 Bh 10,000.00Rp -RpUpah :Pemasangan 0.000 Bhn -Rp -RpJumlah 4,553,187.09Rp -Rp

Harga Satuan 1 4,553,187.09Rp

JUMLAHHARGA

(Rp)BAHAN

(Rp)UPAH(Rp)2 3NO URAIAN PEKERJAAN KOFESIEN

HARGASATUAN

(Rp)

J U M L A H

Page 4: 88863398 Analisa Pemasangan Acp

1 4 5 6 733 PINTU P3 / UNIT

Bahan :Frame Alumunium 28.600 M' 57,337.50Rp 1,639,852.50RpFrame Daun Jendela 5.800 M' 57,306.50Rp 332,377.70RpKaca Polos 5 mm 6.768 M2 130,055.00Rp 880,212.24RpKaret Kaca/ Sealent 30.690 M' 2,500.00Rp 76,725.00RpGipsum Board 9 mm 6.012 Lbr 60,000.00Rp 360,720.00RpKunci Pintu 2 x Slagh 1.000 Bh 180,000.00Rp 180,000.00RpGrendel Pintu 2.000 Bh 10,000.00Rp 20,000.00RpEngsel Pintu 3.000 Bh 15,000.00Rp 45,000.00RpTarikan Jendela/ Ventilasi Alumunium 0.000 Bh 10,000.00Rp -RpGrendel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpEngsel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpHak Angin Alumunium 0.000 Bh 10,000.00Rp -RpUpah :Pemasangan 0.000 Bhn -Rp -RpJumlah 3,534,887.44Rp -Rp

Harga Satuan 1 3,534,887.44Rp34 PINTU P4 / UNIT

Bahan :Frame Alumunium 11.100 M' 57,337.50Rp 636,446.25RpFrame Daun Jendela 5.800 M' 57,306.50Rp 332,377.70RpKaca Polos 5 mm 1.880 M2 130,055.00Rp 244,503.40RpKaret Kaca/ Sealent 9.430 M' 2,500.00Rp 23,575.00RpGipsum Board 9 mm 1.670 Lbr 60,000.00Rp 100,200.00RpKunci Pintu 2 x Slagh 1.000 Bh 180,000.00Rp 180,000.00RpGrendel Pintu 2.000 Bh 10,000.00Rp 20,000.00RpEngsel Pintu 3.000 Bh 15,000.00Rp 45,000.00RpTarikan Jendela/ Ventilasi Alumunium 0.000 Bh 10,000.00Rp -RpGrendel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpEngsel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpHak Angin Alumunium 0.000 Bh 10,000.00Rp -RpUpah :Pemasangan 0.000 Bhn -Rp -RpJumlah 1,582,102.35Rp -Rp

Harga Satuan 1 1,582,102.35Rp35 PINTU P5 / UNIT

Bahan :Frame Alumunium 5.000 M' 57,337.50Rp 286,687.50RpFrame Daun Jendela 0.000 M' 57,306.50Rp -RpKaca Polos 5 mm 0.000 M2 130,055.00Rp -RpKaret Kaca/ Sealent 0.000 M' 2,500.00Rp -RpPintu Alumunium+Asesoris 1.670 M2 3,000,000.00Rp 5,010,000.00RpKunci Pintu 2 x Slagh 1.000 Bh 180,000.00Rp 180,000.00RpGrendel Pintu 2.000 Bh 10,000.00Rp 20,000.00RpEngsel Pintu 3.000 Bh 15,000.00Rp 45,000.00RpTarikan Jendela/ Ventilasi Alumunium 0.000 Bh 10,000.00Rp -RpGrendel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpEngsel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpHak Angin Alumunium 0.000 Bh 10,000.00Rp -RpUpah :Pemasangan 0.000 Bhn -Rp -RpJumlah 5,541,687.50Rp -Rp

Harga Satuan 1 5,541,687.50Rp36 PINTU P6 / UNIT

Bahan :Frame Alumunium 32.150 M' 57,337.50Rp 1,843,400.63RpFrame Daun Jendela 0.000 M' 57,306.50Rp -RpKaca Polos 5 mm 6.768 M2 130,055.00Rp 880,212.24RpKaret Kaca/ Sealent 36.120 M' 2,500.00Rp 90,300.00RpGipsum Board 9 mm 6.012 Lbr 60,000.00Rp 360,720.00RpKunci Pintu 2 x Slagh 0.000 Bh 180,000.00Rp -RpGrendel Pintu 0.000 Bh 10,000.00Rp -RpEngsel Pintu 3.000 Bh 15,000.00Rp 45,000.00RpTarikan Jendela/ Ventilasi Alumunium 0.000 Bh 10,000.00Rp -RpGrendel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpEngsel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpHak Angin Alumunium 0.000 Bh 10,000.00Rp -RpUpah :Pemasangan 0.000 Bhn -Rp -RpJumlah 3,219,632.87Rp -Rp

Harga Satuan 1 3,219,632.87Rp

JUMLAHHARGA

(Rp)BAHAN

(Rp)UPAH(Rp)2 3NO URAIAN PEKERJAAN KOFESIEN

HARGASATUAN

(Rp)

J U M L A H

Page 5: 88863398 Analisa Pemasangan Acp

1 4 5 6 737 PINTU P7 / UNIT

Bahan :Frame Alumunium 38.700 M' 57,337.50Rp 2,218,961.25RpFrame Daun Jendela 0.000 M' 57,306.50Rp -RpKaca Polos 5 mm 8.178 M2 130,055.00Rp 1,063,589.79RpKaret Kaca/ Sealent 0.000 M' 2,500.00Rp -RpGipsum Board 9 mm 7.265 Lbr 60,000.00Rp 435,900.00RpKunci Pintu 2 x Slagh 0.000 Bh 180,000.00Rp -RpGrendel Pintu 0.000 Bh 10,000.00Rp -RpEngsel Pintu 0.000 Bh 15,000.00Rp -RpTarikan Jendela/ Ventilasi Alumunium 0.000 Bh 10,000.00Rp -RpGrendel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpEngsel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpHak Angin Alumunium 0.000 Bh 10,000.00Rp -RpUpah :Pemasangan 0.000 Bhn -Rp -RpJumlah 3,718,451.04Rp -Rp

Harga Satuan 1 3,718,451.04Rp38 PINTU P13 / UNIT

Bahan :Frame Alumunium 30.800 M' 57,337.50Rp 1,765,995.00RpFrame Daun Jendela 5.800 M' 57,306.50Rp 332,377.70RpKaca Polos 5 mm 7.740 M2 130,055.00Rp 1,006,625.70RpKaret Kaca/ Sealent 36.120 M' 2,500.00Rp 90,300.00RpGipsum Board 9 mm 4.068 Lbr 60,000.00Rp 244,080.00RpKunci Pintu 2 x Slagh 1.000 Bh 180,000.00Rp 180,000.00RpGrendel Pintu 2.000 Bh 10,000.00Rp 20,000.00RpEngsel Pintu 3.000 Bh 15,000.00Rp 45,000.00RpTarikan Jendela/ Ventilasi Alumunium 0.000 Bh 10,000.00Rp -RpGrendel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpEngsel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpHak Angin Alumunium 0.000 Bh 10,000.00Rp -RpUpah :Pemasangan 0.000 Bhn -Rp -RpJumlah 3,684,378.40Rp -Rp

Harga Satuan 1 3,684,378.40Rp39 VENTILASI V1 / UNIT

Bahan :Frame Alumunium 2.000 M' 57,337.50Rp 114,675.00RpFrame Daun Jendela 0.000 M' 57,306.50Rp -RpKaca Polos 5 mm 0.240 M2 130,055.00Rp 31,213.20RpKaret Kaca/ Sealent 0.000 M' 2,500.00Rp -RpGipsum Board 9 mm 0.000 Lbr 60,000.00Rp -RpKunci Pintu 2 x Slagh 0.000 Bh 180,000.00Rp -RpGrendel Pintu 0.000 Bh 10,000.00Rp -RpEngsel Pintu 0.000 Bh 15,000.00Rp -RpTarikan Jendela/ Ventilasi Alumunium 0.000 Bh 10,000.00Rp -RpGrendel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpEngsel Jendela Alumunium 0.000 Bh 10,000.00Rp -RpHak Angin Alumunium 0.000 Bh 10,000.00Rp -RpUpah :Pemasangan 0.000 Bhn -Rp -RpJumlah 145,888.20Rp -Rp

Harga Satuan 1 145,888.20Rp40 PEKERJAAN PENGELASAN/ 10 Cm

Bahan :Solar 0.300 Ltr 5,500.00Rp 1,650.00RpMinyak Pelumas 0.040 Ltr 30,000.00Rp 1,200.00RpKawat Las 0.400 Btg 5,000.00Rp 2,000.00RpUpah :Pekerja 0.040 Org 45,000.00Rp 1,800.00RpTukang 0.020 Org 50,000.00Rp 1,000.00RpKepala Tukang 0.002 Org 55,000.00Rp 110.00RpMandor 0.002 Org 55,000.00Rp 110.00RpAlat 0.170 Bhn 4,850.00Rp 824.50RpJumlah 4,850.00Rp 3,844.50Rp

Harga Satuan 1 8,694.50Rp

JUMLAHHARGA

(Rp)BAHAN

(Rp)UPAH(Rp)2 3NO URAIAN PEKERJAAN KOFESIEN

HARGASATUAN

(Rp)

J U M L A H

Page 6: 88863398 Analisa Pemasangan Acp

1 4 5 6 741 PASANG TERALIS PINTU/ JENDELA/ M2

Bahan :Besi Beton Ø 10 6.000 Kg 11,000.00Rp 66,000.00RpBesi Strip # 5 mm 0.230 Kg 10,000.00Rp 2,300.00RpPengelasan 0.043 10 Cm 8,694.50Rp 373.86RpUpah :Pekerja 1.670 Org 45,000.00Rp 75,150.00RpTukang 1.670 Org 50,000.00Rp 83,500.00RpKepala Tukang 0.167 Org 55,000.00Rp 9,185.00RpMandor 0.083 Org 55,000.00Rp 4,565.00RpJumlah 68,673.86Rp 172,400.00Rp

Harga Satuan 1 241,073.86Rp42 PAS. BATU BATA 1:4/ M2

Bahan :Batu Bata 70.000 Bh 1,000.00Rp 70,000.00RpPortland Cement (PC) 11.500 Kg 1,140.00Rp 13,110.00RpPasir Pasang 0.043 M3 80,000.00Rp 3,440.00RpUpah :Pekerja 0.300 Org 45,000.00Rp 13,500.00RpTukang Batu 0.100 Org 50,000.00Rp 5,000.00RpKepala Tukang 0.010 Org 55,000.00Rp 550.00RpMandor 0.015 Org 55,000.00Rp 825.00RpJumlah 86,550.00Rp 19,875.00Rp

Harga Satuan 1 106,425.00Rp43 PAS. BATU BATA 1:2/ M2

Bahan :Batu Bata 70.000 Bh 1,000.00Rp 70,000.00RpPortland Cement (PC) 18.950 Kg 1,140.00Rp 21,603.00RpPasir Pasang 0.038 M3 80,000.00Rp 3,040.00RpUpah :Pekerja 0.300 Org 45,000.00Rp 13,500.00RpTukang Batu 0.100 Org 50,000.00Rp 5,000.00RpKepala Tukang 0.010 Org 55,000.00Rp 550.00RpMandor 0.015 Org 55,000.00Rp 825.00RpJumlah 94,643.00Rp 19,875.00Rp

Harga Satuan 1 114,518.00Rp44 PLESTERAN 1:4/ M2

Bahan :Portland Cement (PC) 6.240 Kg 1,140.00Rp 7,113.60RpPasir Pasang 0.024 M3 80,000.00Rp 1,920.00RpUpah :Pekerja 0.300 Org 45,000.00Rp 13,500.00RpTukang Batu 0.150 Org 50,000.00Rp 7,500.00RpKepala Tukang 0.015 Org 55,000.00Rp 825.00RpMandor 0.015 Org 55,000.00Rp 825.00RpJumlah 9,033.60Rp 22,650.00Rp

Harga Satuan 1 31,683.60Rp45 PLESTERAN 1:2/ M2

Bahan :Portland Cement (PC) 10.224 Kg 1,140.00Rp 11,655.36RpPasir Pasang 0.024 M3 80,000.00Rp 1,920.00RpUpah :Pekerja 0.300 Org 45,000.00Rp 13,500.00RpTukang Batu 0.150 Org 50,000.00Rp 7,500.00RpKepala Tukang 0.015 Org 55,000.00Rp 825.00RpMandor 0.010 Org 55,000.00Rp 550.00RpJumlah 13,575.36Rp 22,375.00Rp

Harga Satuan 1 35,950.36Rp46 PASANG KERAMIK DINDING KM/ WC Uk. 25x40 Cm/ M2

Bahan :Keramik Dinding KM/ WC Uk. 25 x 40 10.000 Bh 5,000.00Rp 50,000.00RpPortland Cement (PC) 0.228 Zak 57,000.00Rp 12,996.00RpPasir Pasang 0.042 M3 80,000.00Rp 3,360.00RpTepung AA 1.500 Kg 4,000.00Rp 6,000.00RpUpah :Pekerja 0.620 Org 45,000.00Rp 27,900.00RpTukang Batu 0.350 Org 50,000.00Rp 17,500.00RpKepala Tukang 0.035 Org 55,000.00Rp 1,925.00RpMandor 0.030 Org 55,000.00Rp 1,650.00RpJumlah 72,356.00Rp 48,975.00Rp

Harga Satuan 1 121,331.00Rp

JUMLAHHARGA

(Rp)BAHAN

(Rp)UPAH(Rp)2 3NO URAIAN PEKERJAAN KOFESIEN

HARGASATUAN

(Rp)

J U M L A H