DEWI HARDININGTYAS, ST, MT, MBA #8_STOPWATCH TIME STUDY ANALISA DAN PENGUKURAN KERJA

Upload: phungkhanh

Post on 20-Mar-2019

252 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

DEWI HARDININGTYAS, ST, MT, MBA

#8_STOPWATCH TIME STUDY ANALISA DAN PENGUKURAN KERJA

Page 2: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

METODE PENGUKURAN [WAKTU] KERJA

PENGUKURAN [WAKTU] KERJA

DIRECT INDIRECT

STOP-WATCH

WORK SAMPLING

STANDARD DATA

PMTS

Page 3: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

DIRECT VS INDIRECT TIME STUDY

• DIRECT TIME STUDY – Kelebihan :

• PRAKTIS, karena hanya mencatat waktu saja tanpa menganalisa gerakan-gerakan kerja.

– Kekurangan : • Dibutuhkan waktu

pengamatan yang lebih lama agar data AKURAT & TELITI.

• Biaya lebih MAHAL karena harus datang langsung ke lokasi pengamatan.

• INDIRECT TIME STUDY – Kelebihan :

• Waktu pengamatan relatif SINGKAT karena cukup merekam aktivitas kerja.

• Biaya relatif lebih MURAH karena tidak perlu berulang kali datang ke lokasi pengamatan.

– Kekurangan : • Terkadang tabel gerakan

kerja orang EROPA tidak cocok dengan INDONESIA

• Dibutuhkan KETELITIAN yang tinggi dalam membreakdown gerakan-gerakan kerja.

• Data waktu gerakan kerja harus disesuaikan dengan JENIS PEKERJAAN.

Page 4: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

• Element is a component of job or task that are logical divisions with easily identifiable starting and end points, and are repeated on a regular basis

• Cycle is the completion of the activities (elements) required to perform the job under study.

Page 5: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator
Page 6: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

D i r e c t T i m e S t u d y

STOPWATCH TIME STUDY : Elemen kerja berlangsung dalam waktu SINGKAT Waktu siklus kerja PENDEK Siklus kerja terjadi BERULANG-ULANG Waktu elemen kerja diukur dengan STOPWATCH

WORK SAMPLING : Elemen kerja berlangsung dalam waktu LAMA Waktu siklus kerja PANJANG Siklus kerja TIDAK BERULANG Mencari % kerja dan % delay (PROBABILITAS)

Page 7: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

LANGKAH – LANGKAH PENGUKURAN [WAKTU] KERJA

Page 8: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

1. Mengumpulkan informasi dan peralatan

• Tentukan TUJUAN dari pengukuran kerja!

• Melakukan pengamatan pendahuluan

(layout, lingkungan kerja, mesin yang

digunakan, dll).

• Menyiapkan peralatan :

– stopwatch, papan, kalkulator, form pengukuran kerja

• Memilih operator yang akan diamati dan mengkomunikasikan dengan supervisor (operator harus memiliki kemampuan NORMAL, bisa BEKERJA SAMA, dan WAJAR.

Page 9: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator
Page 10: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator
Page 11: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator
Page 12: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

2. Membagi operasi dalam elemen-elemen

• Purpose : easy to measure & line balancing

• Separate handling time (non-productive time) with operation time (productive time)

• Separate constant element with variable element.

• Every element must have an easily identifiable starting and ending point (breakpoints)

• Continuities between elements

• Elements times: 0.04min (short), 0.25min (reasonable)

• Relative frequency must be included

Page 13: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

3. Metode Stopwatch Time Study

• CONTINUOUS TIMING

Tombol stop-watch ditekan pada saat awal elemen kerja dan terus dibiarkan berjalan selama periode studi. Pengamat terus melihat jalannya jarum stop-watch dan setiap awal/akhir dari sebuah elemen kerja yang ada mencatat dan menuliskannya di lembar pengamatan. Waktu setiap elemen kerja akan diperoleh dengan cara “pengurangan” dan dilakukan setelah studi pengukuran kerja selesai dilaksanakan. APA KEKURANGAN-NYA???

• REPETITIVE (SNAP-BACK METHOD)

Jarum penunjuk stop-watch selalu dikembalikan ke posisi nol setiap kali satu elemen kegiatan selesai dilaksanakan. Waktu yang diamati dan dicatat akan merupakan waktu yang sebenarnya. Time study analyst akan bisa mendeteksi dengan mudah adanya variasi perbedaan waktu dari setiap elemen kegiatan. APA KEKURANGAN-NYA???

• ACCUMULATIVE TIMING

Merupakan kombinasi cara pengukuran dengan metoda continuous dan snap-back (pengukuran dilaksanakan dengan menggunakan dua atau lebih stop-watch yang bekerja secara bergantian).

Page 14: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

THE R

ULES !!!

Don’t comment to the worker during the task

Stand (don’t sit) beside the worker

Write every event (even though it may seems not important)

Have a good position to observe

Stop the study if the worker seems to be under pressure and it affects his/her work

Page 15: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

PENGAMATAN!!!!

Page 16: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

Time Study Observation Sheet

Identification of operation Sandwich Assembly Date 5/17

Operator Approval Observer

Smith Jones Russell

Cycles Summary

1 2 3 4 5 6 7 8 9 10 t Nt RF t

Place ham, cheese,

and lettuce on bread

1

2

3

4

Grasp and lay

out bread slices

Spread mayonnaise

on both slices

Place top on sandwich,

Slice, and stack

t

t

t

t

R

R

R

R

.11 .44 .79 1.13 1.47 1.83 2.21 2.60 2.98 3.37

.04 .05 .05 .04 .06 .05 .06 .06 .07 .05 .53 .053 1.05 .056

.04 .38 .72 1.05 1.40 1.76 2.13 2.50 2.89 3.29

.07 .06 .07 .08 .08 .08 .07 .07 .10 .09 .77 .077 .077 1.00

.11 .12 .14 .12 .12 .13 .13 .13 .14 .14 1.28 1.28 1.10 .141

.93 .23 .55 1.25 1.60 1.96 2.34 2.72 3.12 3.51

.12 .10 .08 .09 .12 .10 .11 .11 .10 .10 1.03 1.03 1.10 .113

.33 .67 1.01 1.34 1.71 2.07 2.44 2.82 3.24 3.61

Page 17: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

4. Tes Kenormalan, Tes Keseragaman, Tes Kecukupan Data

TES KENORMALAN data pengamatan seharusnya berjumlah cukup besar (banyak) dan berdistribusi normal.

TES KESERAGAMAN data harus homogen dan diperoleh dari populasi yang sama.

TES KECUKUPAN data yang dikumpulkan telah cukup secara obyektif, dengan konsep statistik (derajat ketelitian dan tingkat keyakinan/kepercayaan yang diinginkan).

Page 18: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

Time measurement

– Measuring time of each element

– The number of observation of each element depends on the significance level and required level of accuracy

Determining Number of Cycles

Primary time study

(normally 5 to 10

observation)

Examination of the

required number of

observations (N)

Continue study up to N

observations

Re-checking the required

number of observations (n)

N>=n

End the time study

N=n

No

Yes

Page 19: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

Number of Cycles

To determine sample size:

n = zs

eT

2

where

z = number of standard deviations from the mean in a normal distribution reflecting a level of statistical confidence

T = average job cycle time from the sample time study e = degree of error from true mean of distribution

s = = sample standard deviation from sample time study

(xi - x)2

n - 1

Page 20: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

Number of Cycles : Example

• Average cycle time = 0.361

• Computed standard deviation = 0.03

• Company wants to be 95% confident that computed time is within 5% of true average time

n = = = 10.61 or 11 zs

eT

2 (1.96)(0.03)

(0.05)(0.361)

2

Page 21: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

Recommended number of cycles/observations

Page 22: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

5. Performance Rating & Waktu Normal

Normal time : Tn = Tobs (PR)

1) Waktu Pengamatan (Tobs)

2) TN < TObs untuk p < 1 (100%)

3) TN = TObs untuk p = 1 (100%)

4) TN > TObs untuk p > 1 (100%)

Page 23: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

WESTINGHOUSE RATING SYSTEM

Page 24: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

6. Menentukan Allowance

Allowance

Constant

Personal Needs Fatigue

Special

Avoidable Delays

Unavoidable Delays

More details in : Handbook of IE (Salvendy) : pp. 1409

Page 25: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

7. Waktu Standar dan Output Standar

TS = TN (1 + Apfd) OS = 1 / TS

Waktu Normal (TN) Allowance

Waktu Baku/Standard (TS)

Page 26: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

Let’s Try!

Page 27: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

• Given: A direct time study was taken on a manual work element using the snapback method.

• The regular cycle consisted of three elements : a, b, and c. Element d is an irregular element performed every five cycles.

• Determine

(a) normal time

(b) standard time for the cycle using Apfd = 0.15

E x a m p l e

Work element a b c d

Observed time (min) 0.56 0.25 0.50 1.10

Performance rating 100% 80% 110% 100%

Page 28: #8 STOPWATCH TIME STUDY - An Industrial Ergonomistdewihardiningtyas.lecture.ub.ac.id/files/2012/04/8_APK.pdf · –stopwatch, papan, kalkulator, form pengukuran kerja •Memilih operator

“Knowing exactly what you want to do,

and then seeing that they do it the best

and cheapest way.”

- Frederick W. Taylor-