JUMLAH HARGA (Rp) I MATERIAL 1 Tiang besi 11 meter 200 daN Btg 90 2 Isolator tumpu 20 kV Bh 254 3 Isolator tarik 20 kV Bh 60 4 Cut Out 20 kV + Fuse Bh 3 5 Lighting Arester 20 kV Bh 3 6 Konduktor AAAC 70 mm2 km 11,169 JUMLAH I II ANGKUTAN 1 Tiang besi 11 meter 200 daN btg 90 2 Isolator tumpu 20 kV m3 3,632 3 Isolator tarik 20 kV m3 1,386 4 Cut Out 20 kV + Fuse m3 0,025 5 Lighting Arester 20 kV m3 0,025 6 Konduktor AAAC 70 mm2 m3 2,234 JUMLAH II TOTAL I + II PPN 10 % JUMLAH DIBULATKAN Terbilang ; RENCANA ANGGARAN BIAYA (RAB) PEMBANGUNAN JARINGAN TEGANGAN MENENGAH 20 kV KABUPATEN SABU DESA JADU KEC. SABU BARAT KAB. SABU RAIJUA 023.DL/611/LISDES.NTT/2015 NO URAIAN STN VOL HARGA SATUAN (Rp)

Upload: shinobiinfiltran

Post on 17-Nov-2015

63 views

Category:

Documents


2 download

DESCRIPTION

023.Bq-2015 Sabu Jadu

TRANSCRIPT

  • JUMLAH HARGA

    (Rp)

    I MATERIAL

    1 Tiang besi 11 meter 200 daN Btg 90 2 Isolator tumpu 20 kV Bh 254 3 Isolator tarik 20 kV Bh 60 4 Cut Out 20 kV + Fuse Bh 3 5 Lighting Arester 20 kV Bh 3 6 Konduktor AAAC 70 mm2 km 11,169

    JUMLAH I

    II ANGKUTAN

    1 Tiang besi 11 meter 200 daN btg 90 2 Isolator tumpu 20 kV m3 3,632 3 Isolator tarik 20 kV m3 1,386 4 Cut Out 20 kV + Fuse m3 0,025 5 Lighting Arester 20 kV m3 0,025 6 Konduktor AAAC 70 mm2 m3 2,234

    JUMLAH II

    TOTAL I + IIPPN 10 %JUMLAHDIBULATKAN

    Terbilang ;

    RENCANA ANGGARAN BIAYA (RAB)

    PEMBANGUNAN JARINGAN TEGANGAN MENENGAH 20 kVKABUPATEN SABU

    DESA JADU KEC. SABU BARAT KAB. SABU RAIJUA023.DL/611/LISDES.NTT/2015

    NO URAIAN STN VOLHARGA SATUAN

    (Rp)

  • JUMLAH HARGA(Rp)

    I MATERIAL

    1. Trafo 3 P 50 KVA 20 KV - B2 Buah 1 - 2. Cut Out 20 KV 100 A + Fuse Link Bh 3 - 3. L Arrester 20 KV 10 kA Bh 3 -

    JUMLAH I

    II ANGKUTAN

    1. Trafo 3 P 50 KVA 20 KV - B2 m3 0,693 2. Cut Out 20 KV 100 A + Fuse Link m3 0,069 3. L Arrester 20 KV 10 kA m3 0,025

    JUMLAH II

    TOTAL I + IIPPN 10 %JUMLAHDIBULATKAN

    Terbilang ;

    RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN GARDU TRAFO DISTRIBUSI 20 kV

    KABUPATEN SABUDESA JADU KEC. SABU BARAT KAB. SABU RAIJUA

    023.DL/611/LISDES.NTT/2015

    NO URAIAN STN VOLHARGA SATUAN

    (Rp)

  • JUMLAH HARGA(Rp)

    I MATERIAL1 Tiang Besi 9 meter 100 daN btg 108 2 LVTC 3 X 50+1X35 mm2 km 6

    JUMLAH I

    II ANGKUTAN

    1 Tiang Besi 9 meter 100 daN btg 108 2 LVTC 3 X 50+1X35 mm2 m3 8

    JUMLAH II

    TOTAL I + IIPPN 10 %JUMLAHDIBULATKAN

    Terbilang ;

    RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN JARINGAN TEGANGAN RENDAH (LVTC)

    KABUPATEN SABUDESA JADU KEC. SABU BARAT KAB. SABU RAIJUA

    NO JENIS MATERIAL STN VOLHARGA SATUAN

    (Rp)

  • PAKET 003 A3C 70 mm2 = 3,650 kms

    SA- JUMLAH

    NO. JENIS MATERIAL TU- BAHAN UPAH BAHAN UPAH HARGA

    AN RP RP RP RP RP

    I MATERIAL UTAMA

    1 Tiang besi 11 meter 200 daN Btg 89

    2 Isolator tumpu 20 kV Bh 251

    3 Isolator tarik 20 kV Bh 60

    4 Cut Out 20 kV + Fuse Bh 3

    5 Lighting Arester 20 kV Bh 3

    6 Konduktor AAAC 70 mm2 kms 3,65

    II MATERIAL NON UTAMA

    1 Perlengkapan druck schoor set 9

    2 Perlengkapan kontramast set 1

    3 Treck schoor set 13

    4 Cross Arm UNP 100 (Balance) :

    a. Type A1 set 58

    b. Type A2 set 11

    c. Type A3 set 13

    d. Type B3 set -

    5 H. Type Conector 70 mm2 Bh 39

    6 Alluminium Bending wire Mtr 376,50

    7 Joint sleeve 70 mm2 Bh 6

    8 Penghalang panjat Bh 38

    9 Tanda kilat Bh 79

    10 Arde TM u/ Arrester Set 1

    11 Beton kaki tiang Btg 89

    III PEKERJAAN PERSIAPAN

    1 Angkutan Material m3 17,81

    2 Angkutan Tiang Besi Btg 89

    3 Pembersihan Trase Kms 3,65

    IV PEKERJAAN FINISHING

    1 Foto dokumentasi Lbr 30

    2 Gambar Lbr 8

    3 Pengecatan tiang Btg 89

    4 Komisioning Kms 3,65

    SUB. JUMLAH Rp

    PPN 10 % Rp

    JUMLAH Rp

    DIBULATKAN Rp

    VOLUME

    HARGA SATUAN HARGA BAGIAN

    RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN JARINGAN TEGANGAN MENENGAH 20 kV

    KABUPATEN SABUDESA JADU KEC. SABU BARAT KAB. SABU RAIJUA

    023.DL/611/LISDES.NTT/2015

  • PAKET 003 TRAFO 3 PHS 50 KVA = 1 BH

    SA- JUMLAH

    NO. JENIS MATERIAL TU- BAHAN UPAH BAHAN UPAH HARGA

    AN RP RP RP RP RP

    I MATERIAL UTAMA

    1 Tiang besi 11 meter 200 daN Btg 1

    2 Isolator tumpu 20 kV Bh 3

    3 Cut Out 20 kV + Fuse Bh 3

    4 Lighting Arester 20 kV Bh 3

    5 Trafo 3 phs 50 kVA - 20 kV Bh 1

    II MATERIAL NON UTAMA

    1 Penghalang panjat Bh 1

    2 Tanda kilat Bh 1

    3 Rangka Dudukan u/.trafo 3 phs Set 1

    4 Cross Arm type A1 Set 1

    5 Cross Arm u/ dudukan CO Set 1

    6 LV Board 3 phs 1 tiang 2 Jurusan 2 Pintu Set 1

    7 Cross Arm u/ dudukan Arester Set 1

    8 Pipa Inlet-Outlet Medium B + Invoring Set 1

    9 Alluminium Bending wire Mtr 4,50

    10 Arde Gardu Set 1

    11 Arde TM u/ Arrester Set 1

    12 Pondasi Lantai Kerja Bh 1

    13 Paralel Grove 35 - 70 mm Bh 3

    14 Kabel NYY 50 mm2 mtr 96,00

    15 Sepatu Kabel AL-CU 35-50 mm2 Bh 3

    16 Sepatu Kabel CU 50 mm2 Bh 16

    17 Beton kaki tiang Btg 1

    III PEKERJAAN PERSIAPAN

    1 Pengedropan Material m3 1,56

    2 Pengedropan Tiang Besi btg 1

    IV PEKERJAAN FINISHING

    1 Foto dokumentasi Lbr 2

    2 Penomoran Tiang Btg 1

    3 Penomoran Tiang Btg 1

    4 Komisioning Bh 1

    SUB. JUMLAH Rp

    PPN 10 % Rp

    JUMLAH Rp

    DIBULATKAN Rp

    RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN GARDU TRAFO DISTRIBUSI 20 kV

    KABUPATEN SABUDESA JADU KEC. SABU BARAT KAB. SABU RAIJUA

    023.DL/611/LISDES.NTT/2015

    VOLUME

    HARGA SATUAN HARGA BAGIAN

  • PAKET 003 LVTC 3X50+1X35 MM2 = 6,150 KMS

    SA- JUMLAH

    NO. JENIS MATERIAL TU- BAHAN UPAH BAHAN UPAH HARGA

    AN RP RP RP RP RP

    I MATERIAL UTAMA

    1 Tiang besi 9 mtr 100 daN Btg 108

    3 LVTC 3 x 50- + 1 x 35 mm2 km 6,15

    II MATERIAL NON UTAMA

    1 Perlengkapan druck schoor Set 10

    2 Perlengkapan kontramast Set -

    3 Treck schoor Set 19

    4 Beton kaki tiang btg 108

    ACCESSORIES LVTC :

    5 Suspension Assembly Set 96

    6 Large Angle Assembly Set 29

    7 Fixed Dead End Assembly Set 12

    8 Adjustable Dead End Assembly Set 12

    9 Bundle End Protection Set 12

    10 Bimetalic Joint 50 mm2 Bh 6

    11 Joint Sleves 50 mm2 Bh 20

    12 Arde TR ( 5 ohm ) Set 22

    13 Tap Conector bh 16

    III PEKERJAAN PERSIAPAN

    1 Pengedropan Material m3 22,99

    2 Pengedropan Tiang Besi Btg 108

    3 Pembersihan Trase kms 6,15

    IV PEKERJAAN FINISHING

    1 Foto dokumentasi Lbr 32

    2 Gambar revisi Lbr 14

    3 Penomoran tiang Btg 137

    4 Pengecatan tiang Btg 108

    5 Komisioning kms 6,15

    SUB. JUMLAH Rp

    PPN 10 % Rp

    JUMLAH Rp

    DIBULATKAN Rp

    VOLUME

    HARGA SATUAN HARGA BAGIAN

    RENCANA ANGGARAN BIAYA (RAB)PEMBANGUNAN JARINGAN TEGANGAN RENDAH (LVTC)

    KABUPATEN SABUDESA JADU KEC. SABU BARAT KAB. SABU RAIJUA

    023.DL/611/LISDES.NTT/2015

  • SATUAN KERJA LISTRIK PERDESAAN

    PROVINSI NUSA TENGGARA TIMUR

    I JARINGAN TEGANGAN MENENGAH

    - PENGADAAN

    - PEMASANGAN

    II GARDU DISTRIBUSI 1 50

    - PENGADAAN

    - PEMASANGAN

    III JARINGAN TEGANGAN RENDAH

    - PENGADAAN

    - PEMASANGAN

    Terbilang :

    KMS

    6,150

    KMS

    BH/KVA

    PT. PLN (PERSERO)

    REKAPITULASIRENCANA ANGGARAN BIAYA (RAB)

    PEMBANGUNAN JARINGAN DISTRIBUSI DAN GARDUKABUPATEN SABU

    DESA JADU KEC. SABU BARAT KAB. SABU RAIJUA023.DL/611/LISDES.NTT/2015

    NO URAIAN SATUANJUMLAH HARGA

    RPVOLUME

    3,650

  • PT. PLN (Persero) UNIT PELAKSANA KONTRUKSI (UPK) SATKER LISTRIK PERDESAAN NTT

    JUMLAH

    URAIAN STN VOLUME HARGA

    ( Rp.) (Rp.)

    1 Type A1 Balance UNP 100x50x5x2000

    1 UNP 100x50x5x2000 mm Btg 1

    2 Pole band 1/2, 4" (6x50) Bh 1

    3 Pole band 2/2, 4" (6x50) set 1

    4 Arm Tie ( Besi L. 50x4x1270 mm) btng 1

    5 Steel plat type 2 bh 2

    6 Bollt & nut 5/8 x 70 + ring (galvanis) Bh 5

    7 Bollt & nut 5/8 x 140 + ring (galvanis) bh 2

    Jumlah

    Pembulatan

    2 Type A2 Balance UNP 100x50x5x2000

    1 UNP 100x50x5x2000 mm Btg 2

    2 Pole band 2/2, 4" (6x50) bh 2

    3 Steel Plate typre I (6x100x37,5) bh 4

    4 Steel Plate typre II (6x100x12) bh 4

    5 Arm Tie ( Besi L. 50x4xx 1270 mm) btng 1

    6 Bollt & nut 5/8 x 70 + ring (galvanis) Bh 3

    7 Bollt & nut 5/8 x 140 + ring (galvanis) bh 14

    Jumlah

    Pembulatan

    3 Type A3 Balance UNP 100x50x5x2000

    1 UNP 100x50x5x2000 mm btng 2

    2 Pole band 2/2, 4" (6x50) bh 2

    3 Steel Plate typre I (6x100x37,5) bh 4

    4 Steel Plate typre II (6x100x12) bh 4

    5 Arm Tie ( Besi L. 50x4xx 1270 mm) btng 1

    6 Bollt & nut 5/8 x 70 + ring (galvanis) Bh 3

    7 Bollt & nut 5/8 x 140 + ring (galvanis) bh 14

    Jumlah

    Pembulatan

    4 Type B3 Balance UNP 100x50x5x2200

    1 UNP 10x50x5x2200 mm btng 2

    2 Pole band 2/2, 4" (6x50) set 2

    3 Steel Plate typre I (6x100x37,5) bh 6

    4 Bollt & nut 5/8 x 140 + ring (galvanis) bh 12

    5 Bollt & nut 5/8 x200 + 4 mur (galv) bh 4

    Jumlah

    Pembulatan

    5 Treck scoor - Guy Wire TM

    1 Stall drad 64 mm2 mtr 15

    2 Pole band 2/2, 4" (6x50) set 1

    3 Bolt nut + Plat & spring plat 5/8" x 50 mm galv bh 2

    4 Spanschroef 3/4" / Turn Bucle 50 KN bh 1

    5 Guy isolator/tui isolator bh 1

    6 Wire clip/cros by 35 mm2 bh 4

    7 Stay road 16 mm2 panjang = 2500 mm (anker) btng 1

    8 Cousen gegalv 64 mm2/guy wire thimble 70 mm2 Set 2

    9 Beton Block 40x40x10 bh 110 U-Bolt 19mm with nut+plat 120x50x5 u/beton blok set 1

    Jumlah

    Pembulatan

    6 Kontramast - Horizontal Guy Wire

    1 Stall drad 64 mm2 mtr 26

    2 Pole band 2/2, 4" (6x50) set 2

    3 Bolt nut + Plat & spring plat 5/8" x 50 mm galv bh 4

    4 Spanschroef 3/4" / Turn Bucle 50 KN bh 2

    5 Guy isolator/tui isolator bh 2

    6 Wire clip/cros by 12 mm2 bh 6

    7 Stay road 16 mm2 panjang = 2500 mm (anker) bh 1

    8 Cousen gegalv 64 mm2/guy wire thimble 70 mm2 Set 4

    9 Beton Block 40 cmx40 cmx10 cm bh 1

    10 U-Bolt 19mm with nut+plat 120x50x5 u/beton blok set 1

    Jumlah

    Pembulatan

    ANALISA HARGA SATUAN MATERIAL AKSSESORIS

    TAHUN 2015

    HARGA SATUANHARGA BAGIAN

    NO.

    ( Rp.)

  • 7 Druck Schoor TM

    1 Pole band galvanise 1/2 4" bh 1

    2 Pole band galvanise 2/2 4" (atas) bh 2

    3 Pole band galvanise 2/2 8' (bawah) u/sekang bh 2

    4 Pipa galvanise Diameter 2"- panajang 2000 mm btng 1

    5 Besi UNP 100x50x5x200 mm u/stop druck btng 1

    6 Bolt nut + plat & spring plat 5/8' x 50 mm galv bh 9

    Jumlah

    Pembulatan

    1 M2 CAT TIANG BESI

    Cat dasar Kg 0,1

    Minyak cat Ltr 0,05

    Cat besi Kg 0,15

    kuas Lbr 0,1

    Pekerja HO 0,3

    Mandor HO 0,125

    Tukang HO 0,25

    Jumlah

    Pembulatan

    8 Pengecatan T. besi 9 mtr (1 batang) - Material m2/btg 2,814

    Upah m2/btg 2,814

    Jumlah

    Pembulatan

    9 Pengecatan T. besi 11 mtr (1 batang) - Material m2/btg 4,691

    Upah m2/btg 4,691

    Jumlah

    Pembulatan

    8 ARDE ARESTER

    1 Grounding Rod 16 mm2 L = 1750 mm bh 2,00

    2 BC 50 mm2 Mtr 15,00

    3 Pipa Galvanis 1/2" L= 6000 mm Btg 1,00

    4 Klem Steinless Steel 4 titik mtr 4,00

    5 Connector CU 35 - 50 mm2 Buah 3,00

    6 Stoping Bukle bh 4,00

    7 Link 25 x 25 bh 4,00

    Jumlah

    Pembulatan

    9 ARDE GARDU

    1 Grounding Rod 16 mm2 L = 1750 mm bh 1,00

    2 BC 50 mm2 Mtr 11,00

    3 Pipa Galvanis 1/2" L = 2000 mm bh 1,00

    4 Klem Steinless Steel 4 titik mtr 4,00

    5 Connector Cu 35 - 50 mm mm2 bh 2,00

    6 Sepatu Kabel CU 50 mm2 bh 1,00

    7 Stoping Bukle bh 4,00

    8 Link bh 4,00

    Jumlah

    Pembulatan

    10 RANGKA DUDUKAN TRAFO 25-50 KVA (CANTOL) :

    1 UNP 100 x 45x4x1500 mm galv Btg 2,00

    2 UNP 100 x 45x4x750 mm galv Btg 2,00

    3 UNP 100 x 45x4x 600mm galv btg 2,00

    4 Arm tie galvanise 50x50x5 1000 mm btg 2,00

    5 Arm tie galvanise 50x50x5 1200 mm btg 2,00

    6 Bolt nut + plat & spring plat 5/8" 300 mm bh 2,00

    7 Bolt nut + plat & spring plat 5/8" 50 mm bh 18,00

    8 Pole band 1/2 6" u penahan dudukan trafo bh 4,00

    Jumlah -

    Pembulatan -

    11 TRAVERS UNTUK CUT OUT DAN ARRESTER :

    1 UNP 100x50x5x2000 mm u/dudukan CO dan Arester btg 1,00

    2 Pole band 1/2, 4" (6 X 70) bh 1,00

    3 Bolt nut + plat & spring plat 5/8" 50 mm bh 2,00

    Jumlah

    Pembulatan

    12 BETON BLOCK UNTUK SCHOOR TARIK

    1 Beton Cor : 1 ; 2 ; 3 (40cmx40 cm x10 cm) M3 0,0160

    2 Besi Beton 16 mm2 Galvanis L=2500 mm btg 1,0000

    3 U. Bolt 3/4" Buah 1,00

    Jumlah -

    Pembulatan -

  • 13 LV Board ( Lemari bagi TR) 2 Jurusan 2 Pintu

    1 LV Board ( Lemari bagi TR) 2 Jurusan 2 Pintu set 1,00

    2 UNP 100 x 50x100 mm L 1000 mm galv btg 2,00

    3 Pole band 1/2, 7" bh 2,00

    4 Bolt nut + plat & spring plat 5/8" 50 mm bh 4,00

    Jumlah -

    Pembulatan

    14 Pipa Inlet / Oulet Gardu

    1 Pipa 2" Galvanise btg 3,00

    2 L - bow pipa PVC 2" u/ bagian atas bh 3,00

    3 UNP 100 x 50 x 5 x 500 mm u/ dudukan pipa galv btng 2,00

    4 Pole band 1/2 4" bh 2,00

    5 Pole band 1/2 2" bh 6,00

    6 Bolt nut + plat & spring plat 5/8" 50 mm bh 16,00

    Jumlah

    Pembulatan

    15 PONDASI COR BETON MANSET :

    1 M3 COR BETON 1:2:3 :

    1 Semen (PC) Zak 8,30

    2 Kerikil Beton M3 0,83

    3 Pasir Pasangan M3 0,54

    4 Pekerja Org 6,00

    5 Tukang Batu Org 1,00

    6 Kepala Tukang Org 0,10

    7 Mandor Org 0,30

    Jumlah

    Pembulatan

    8 Cor Kaki Tiang Besi 11 mtr 200 daN m3 0,118

    9 Cor Kaki Tiang Besi 9 mtr 100 daN m3 0,093

    10 Cor Lantai Kerja Gardu 120cm x 100 cm x 10 cm m3 0,269

    Jumlah

    Pembulatan

    16 1 M3 GALIAN TANAH BIASA SEDALAM 2 M :

    1 Pekerja OH 0,667

    2 Tukang Batu OH 0,333

    3 Tukang Listrik OH

    4 Mandor OH 0,333

    Jumlah

    Pembulatan

    17 1 M3 GALIAN BATU CADAS SEDALAM 2 M :

    1 Pekerja OH 2,500

    2 Tukang Batu OH 1,250

    3 Tukang Listrik OH

    4 Mandor OH 1,250

    Jumlah

    Pembulatan

    18 1 M3 URUGAN KEMBALI :

    1 Pekerja OH 0,400

    2 Tukang Batu OH -

    3 Kepala Tukang OH -

    4 Mandor OH 0,200

    Jumlah

    Pembulatan

    19 1 M3 PEMADATAN TANAH :

    1 Pekerja OH 0,250

    2 Tukang Batu OH

    3 Kepala Tukang OH

    4 Mandor OH 0,125

    Jumlah

    Pembulatan

    RATA2 GALIAN PER M3 NTT(1/2 CADAS+1/2 TANAH) m3 1,00

    Volumer galian satu lubang tiang 11m 200 daN m3 0,45

    Volumer galian satu lubang tiang 9m 100 daN m3 0,38

    Mendirikan tiang 11 m 200 daN

    Pekerja HO 0,50

    Tukang Listrik HO 0,13

    Mandor HO 0,13

    Jumlah

    Pembulatan

    Mendirikan tiang 9 m 100 daN

    Pekerja HO 0,33

    Tukang Listrik HO 0,08

    Mandor HO 0,08

    Jumlah

    Pembulatan

  • 20 MENDIRIKAN TIANG 11 M 200 daN PERMANENT btg 1

    21 MENDIRIKAN TIANG 9 M 100 daN PERMANENT btg 1

    22 Alluminium Bending wire mtr 1

    23 Joint sleeve 70 mm2 bh 1

    24 Penghalang panjat bh 1

    25 Tanda kilat Kecil bh 1

    26 Tanda kilat Besar u. Gardu bh 1

    27 Parel Grove 35-70 mm bh 1

    28 Sepatu Kabel Cu 50 mm bh 1

    29 Sepatu Kabel AL-CU 35-50 mm bh 1

  • PT. PLN (Persero) UNIT PELAKSANA KONTRUKSI (UPK) SATKER LISTRIK PERDESAAN NTT

    JUMLAH

    NO. URAIAN STN VOL HARGA

    ( Rp.) ( Rp.) (Rp.)

    1 Suspension Assembly

    1 Suspension Clamp bh 1

    2 Pole Bracket bh 1

    3 Stainless Steel Strip 20 x 0,7 mm mtr 1,75

    4 Stopping bukle bh 2

    5 Plastic strip bh 3

    Jumlah

    Pembulatan

    2 Large Angle Assembly

    1 Strain Clamp 25 - 70 bh 2

    2 Pole Bracket bh 1

    3 Stainless Steel Strip 20 x 0,7 mm mtr 1,75

    4 Stopping bukle bh 2

    5 Plastic strip bh 3

    Jumlah

    Pembulatan

    3 Fixed Dead And Assembly

    1 Strain Clamp 25 - 70 bh 1

    2 Pole Bracket bh 1

    3 Stainless Steel Strip 20 x 0,7 mm mtr 1,75

    4 Stopping bukle bh 2

    5 Plastic strip bh 2

    Jumlah

    Pembulatan

    4 Adjustable Dead And Assembly

    1 Strain Clamp 25 - 70 bh 1

    2 Pole Bracket bh 1

    3 Stainless Steel Strip 20 x 0,7 mm mtr 1,75

    4 Stopping bukle bh 2

    5 Plastic strip bh 2

    6 Turn Buckle/Span Scroef bh 1

    Jumlah

    Pembulatan

    5 Bundle Protection

    1 Pipa PVC 2" 50 cm bh 1

    2 Stainless Steel Strip 20 x 0,7 mm mtr 1,75

    3 Stopping bukle Bh 2

    4 Link Set 2

    5 End cap Set 4

    Jumlah

    Pembulatan

    ANALISA HARGA SATUAN MATERIAL SUTR

    TAHUN 2015

    HARGA

    SATUAN

    HARGA

    BAGIAN

  • PT. PLN (Persero) UNIT PELAKSANA KONTRUKSI (UPK) SATKER LISTRIK PERDESAAN NTT

    JUMLAH

    NO. URAIAN STN VOL HARGA

    ( Rp.) ( Rp.) (Rp.)

    ANALISA HARGA SATUAN MATERIAL SUTR

    TAHUN 2015

    HARGA

    SATUAN

    HARGA

    BAGIAN

    6 Treck scoor - Guy Wire TR1 Stall drad 35 mm2 mtr 11 2 Pole band 2/2" dia 4" (45 x 4 mm) bh 1 3 Mur Baut 5/8"-50 mm +Plat+Ring Plat bh 2 4 Spanschroef/ Turn Bucle 17 KN bh 1 5 Guy isolator/tui isolator dia 8 mm bh 1 6 Cousen gegalv 8 mm2 bh 2 7 Stay road 16 mm2 panjang = 1800 mm bh 1 8 Cros by 8 mm2 bh 4 9 Beton Block 40x40x10 dengan besi penguat 8 mm bh 1

    10 U bolt 16 mm + nut plat u. Beton block bh 1

    Jumlah - Pembulatan -

    7 Kontramast - Horizontal Guy Wire

    1 Stall drad 35 mm2 mtr 26 2 Pole band 2/2, 4" (6x50) bh 2 3 Bolt nut + Plat & spring plat 5/8" x 50 mm galv bh 4 4 Spanschroef 3/4" / Turn Bucle 17 KN bh 2 5 Guy isolator/tui isolator bh 2 6 Wire clip/cros by 12 mm2 bh 8 7 Stay road 16 mm2 panjang = 2500 mm (anker) bh 1 8 Cousen gegalv 64 mm2/guy wire thimble 70 mm2 Set 4

    9 Beton Block 40 cmx40 cmx10 cm bh 1

    10 U bolt 16 mm + nut plat u. Beton block bh 1

    Jumlah -

    Pembulatan -

    8 Druck Schoor TR

    1 Pole band galvanise 1/2 3" bh 1

    2 Pole band galvanise 2/2 3" (atas) bh 2

    3 Pole band galvanise 2/2 5' (bawah) u/sekang bh 2

    4 Pipa galvanise Diameter 2"- panjang 1200 mm btng 1

    5 Besi UNP 8 L=160 mm btng 1

    6 Bolt nut + plat & spring plat 5/8' x 50 mm galv bh 9

    Jumlah -

    Pembulatan -

    9 GROUNDING TR

    1 Grounding Rod 16 mm2 L = 1750 mm bh 1

    2 BC 50 mm2 Mtr 10

    3 Pipa Galvanis 1/2" L= 6000 mm Btg 1

    4 Klem Steinless Steel 4 titik 3 titik mtr 4

    5 AL/CU 35 - 50 mm2 bh 1

    6 Electroda clam cu bh 1

    7 Stoping bukle bh 4

    8 Link 25 x 25 bh 4

    Jumlah -

    Pembulatan -

    10 Tap Connector 25 - 50 mm2 bh 1

    11 Compression Joint 50 mm2+ heat shrink set 1

  • LVTC 3x35+1x50 mm'?= 0,900 kmsTiang besi I meter 100 dAN = 29 batans

    Skala : Non Skala

    GAMBAR RENCANAPEMBANGUNAN JARINGAN TEGANGAN RENDAH

    DESA JADU KEC. SABU BARAT KAB. SABU RAIJUA

    PT. PLN ( PERSERO ) WLAYAH NTTUNIT PELAKSANA KONSTRUKSI

    K UPANG Group Distribusi

  • 'q'"o

    6qaCt

    Skala : Non SkalaDigambar:

    GAMBAR RENCANAPEMBANGUNAN JARINGAN TEGANGAN RENDAH

    DESA TITINA LEDA KEC. SABU BARAT KAB. SABU RAIJUA

    No. Gambar :PT. PLN ( PERSERO ) WLAYAH NTT

    UNIT PELAKSANA KONSTRUKSIK UPANG Group Distribusi